National Library of Energy BETA

Sample records for mount va ri

  1. The Mount Princeton geothermal area, Chaffee County, Colorado...

    Open Energy Info (EERE)

    Book Section: The Mount Princeton geothermal area, Chaffee County, Colorado Authors H.J. Olson and F. Dellechaie Editors Epis, R.C. & Weimer and R.I. Published Colorado School...

  2. Arlington, VA 22209 USA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    600, 1901 North Moore Street Arlington, VA 22209 USA Phone: (703) 522-0086 * Fax: (703) 522-0548 governmentaffairs@hpba.org www.hpba.org U.S. Department of Energy Mr. Daniel Cohen ...

  3. Mirror mount

    DOE Patents [OSTI]

    Humpal, Harold H.

    1987-01-01

    A mirror mount (10) is provided that allows free pitch, yaw and roll motion of the mirror (28) while keeping the location of a point (56) on the surface of the mirror (28) fixed in the rest frame of reference of the mount (10). Yaw movement is provided by two yaw cylinders (30,32) that are bearing (52) mounted to provide rotation. Pitch and roll motion is provided by a spherically annular shell (42) that is air bearing (72,74) mounted to move between a clamp (60) and an upper pedestal bearing (44). The centers of curvature of the spherical surfaces of the shell (42) lie upon the point (56). Pitch motion and roll motion are separately and independently imparted to mirror (28) by a pair of pitch paddles (34) and a pair of roll paddles (36) that are independently and separately moved by control rods (76,80) driven by motors (78,82).

  4. Mirror mount

    DOE Patents [OSTI]

    Humpal, H.H.

    1987-11-10

    A mirror mount is provided that allows free pitch, yaw and roll motion of the mirror while keeping the location of a point on the surface of the mirror fixed in the rest frame of reference of the mount. Yaw movement is provided by two yaw cylinders that are bearing mounted to provide rotation. Pitch and roll motion is provided by a spherically annular shell that is air bearing mounted to move between a clamp and an upper pedestal bearing. The centers of curvature of the spherical surfaces of the shell lie upon the point. Pitch motion and roll motion are separately and independently imparted to mirror by a pair of pitch paddles and a pair of roll paddles that are independently and separately moved by control rods driven by motors. 5 figs.

  5. Mirror mount

    DOE Patents [OSTI]

    Humpal, H.H.

    1986-03-21

    A mirror mount is provided that allows free pitch, yaw and roll motion of the mirror while keeping the location of a point on the surface of the mirror fixed in the rest frame of reference of the mount. Yaw movement is provided by two yaw cylinders that are bearing mounted to provide rotation. Pitch and roll motion is provided by a spherically annular shell that is air bearing mounted to move between a clamp and an upper pedestal bearing. The centers of curvature of the spherical surfaces of the shell lie upon the point. Pitch motion and roll motion are separately and independently imparted to mirror by a pair of pitch paddles and a pair of roll paddles that are independently and separately moved by control rods driven by motors.

  6. Mirror mount

    DOE Patents [OSTI]

    Kuklo, Thomas C.; Bender, Donald A.

    1994-01-01

    A unique lens or mirror mount having adjustable constraints at two key locations to allow for "X" and "Y" tilts of the mirror only. The device uses two pair of flexures of a type such that the pivots of the mirror gimble are rigidly fixed in all planes allowing the device to have zero stacking tolerance and zero wear over time.

  7. Mirror mount

    DOE Patents [OSTI]

    Kuklo, T.C.; Bender, D.A.

    1994-10-04

    A unique lens or mirror mount having adjustable constraints at two key locations to allow for ''X'' and ''Y'' tilts of the mirror only is disclosed. The device uses two pair of flexures of a type such that the pivots of the mirror gimble are rigidly fixed in all planes allowing the device to have zero stacking tolerance and zero wear over time. 4 figs.

  8. Tape Mounts Last 30 Days

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tape Mounts Last 30 Days Tape Mounts Last 30 Days Daily Tape Mounts

  9. Category:Providence, RI | Open Energy Information

    Open Energy Info (EERE)

    Providence, RI Jump to: navigation, search Go Back to PV Economics By Location Media in category "Providence, RI" The following 16 files are in this category, out of 16 total....

  10. VA's Performance Contracting Program Overview

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers the Veteran Administration's (VA's) performance contracting program, including its annual energy savings performance contract (ESPC) plans.

  11. PV module mounting method and mounting assembly

    DOE Patents [OSTI]

    Lenox, Carl J.S.; Johnson, Kurt M.

    2013-04-23

    A method for mounting PV modules to a deck includes selecting PV module layout pattern so that adjacent PV module edges are spaced apart. PV mounting and support assemblies are secured to the deck according to the layout pattern using fasteners extending into the deck. The PV modules are placed on the PV mounting and support assemblies. Retaining elements are located over and secured against the upper peripheral edge surfaces of the PV modules so to secure them to the deck with the peripheral edges of the PV modules spaced apart from the deck. In some examples a PV module mounting assembly, for use on a shingled deck, comprises flashing, a base mountable on the flashing, a deck-penetrating fastener engageable with the base and securable to the deck so to secure the flashing and the base to the shingled deck, and PV module mounting hardware securable to the base.

  12. Magnetic core mounting system

    DOE Patents [OSTI]

    Ronning, Jeffrey J. (Fishers, IN)

    2002-01-01

    A mounting apparatus for an electromagnetic device such as a transformer of inductor includes a generally planar metallic plate as a first heat sink, and a metallic mounting cup as a second heat sink. The mounting cup includes a cavity configured to receive the electromagnetic device, the cavity being defined by a base, and an axially-extending annular sidewall extending from the base to a flange portion of the mounting cup. The mounting cup includes first and second passages for allowing the leads of first and second windings of the electromagnetic device to be routed out of the cavity. The cavity is filled with a polyurethane potting resin, and the mounting cup, including the potted electromagnetic device, is mounted to the plate heat sink using fasteners. The mounting cup, which surrounds the electromagnetic device, in combination with the potting resin provides improved thermal transfer to the plate heat sink, as well as providing resistance to vibration and shocks.

  13. Category:Richmond, VA | Open Energy Information

    Open Energy Info (EERE)

    Richmond, VA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Richmond, VA" The following 16 files are in this category, out of 16 total....

  14. Photovoltaic module mounting system

    DOE Patents [OSTI]

    Miros, Robert H. J.; Mittan, Margaret Birmingham; Seery, Martin N.; Holland, Rodney H.

    2012-04-17

    A solar array mounting system having unique installation, load distribution, and grounding features, and which is adaptable for mounting solar panels having no external frame. The solar array mounting system includes flexible, pedestal-style feet and structural links connected in a grid formation on the mounting surface. The photovoltaic modules are secured in place via the use of attachment clamps that grip the edge of the typically glass substrate. The panel mounting clamps are then held in place by tilt brackets and/or mid-link brackets that provide fixation for the clamps and align the solar panels at a tilt to the horizontal mounting surface. The tilt brackets are held in place atop the flexible feet and connected link members thus creating a complete mounting structure.

  15. Photovoltaic module mounting system

    DOE Patents [OSTI]

    Miros, Robert H. J.; Mittan, Margaret Birmingham; Seery, Martin N; Holland, Rodney H

    2012-09-18

    A solar array mounting system having unique installation, load distribution, and grounding features, and which is adaptable for mounting solar panels having no external frame. The solar array mounting system includes flexible, pedestal-style feet and structural links connected in a grid formation on the mounting surface. The photovoltaic modules are secured in place via the use of attachment clamps that grip the edge of the typically glass substrate. The panel mounting clamps are then held in place by tilt brackets and/or mid-link brackets that provide fixation for the clamps and align the solar panels at a tilt to the horizontal mounting surface. The tilt brackets are held in place atop the flexible feet and connected link members thus creating a complete mounting structure.

  16. High bandwidth optical mount

    DOE Patents [OSTI]

    Bender, D.A.; Kuklo, T.

    1994-11-08

    An optical mount, which directs a laser beam to a point by controlling the position of a light-transmitting optic, is stiffened so that a lowest resonant frequency of the mount is approximately one kilohertz. The optical mount, which is cylindrically-shaped, positions the optic by individually moving a plurality of carriages which are positioned longitudinally within a sidewall of the mount. The optical mount is stiffened by allowing each carriage, which is attached to the optic, to move only in a direction which is substantially parallel to a center axis of the optic. The carriage is limited to an axial movement by flexures or linear bearings which connect the carriage to the mount. The carriage is moved by a piezoelectric transducer. By limiting the carriage to axial movement, the optic can be kinematically clamped to a carriage. 5 figs.

  17. High bandwidth optical mount

    DOE Patents [OSTI]

    Bender, Donald A.; Kuklo, Thomas

    1994-01-01

    An optical mount, which directs a laser beam to a point by controlling the position of a light-transmitting optic, is stiffened so that a lowest resonant frequency of the mount is approximately one kilohertz. The optical mount, which is cylindrically-shaped, positions the optic by individually moving a plurality of carriages which are positioned longitudinally within a sidewall of the mount. The optical mount is stiffened by allowing each carriage, which is attached to the optic, to move only in a direction which is substantially parallel to a center axis of the optic. The carriage is limited to an axial movement by flexures or linear bearings which connect the carriage to the mount. The carriage is moved by a piezoelectric transducer. By limiting the carriage to axial movement, the optic can be kinematically clamped to a carriage.

  18. Stable mirror mount

    DOE Patents [OSTI]

    Cutburth, Ronald W. (Bulls Gap, TN)

    1990-01-01

    An improved mirror mount assembly is disclosed. The mirror mount assembly provides a post assembly slidable in a Y-axis orientation and a nut plate assembly slidable in an X-axis orientation and a device for simultaneously locking the post assembly and the key assembly in a fixed position.

  19. Stable mirror mount

    DOE Patents [OSTI]

    Cutburth, R.W.

    1983-11-04

    An improved mirror mount assembly is disclosed. The mirror mount assembly provides a post assembly slidable in a Y-axis orientation and a nut plate assembly slidable in an X-axis orientation and means for simultaneously locking said post assembly and said key assembly in a fixed position.

  20. Optoelectronic Mounting Structure

    DOE Patents [OSTI]

    Anderson, Gene R.; Armendariz, Marcelino G.; Baca, Johnny R. F.; Bryan, Robert P.; Carson, Richard F.; Chu, Dahwey; Duckett, III, Edwin B.; McCormick, Frederick B.; Peterson, David W.; Peterson, Gary D.; Reber, Cathleen A.; Reysen, Bill H.

    2004-10-05

    An optoelectronic mounting structure is provided that may be used in conjunction with an optical transmitter, receiver or transceiver module. The mounting structure may be a flexible printed circuit board. Thermal vias or heat pipes in the head region may transmit heat from the mounting structure to the heat spreader. The heat spreader may provide mechanical rigidity or stiffness to the heat region. In another embodiment, an electrical contact and ground plane may pass along a surface of the head region so as to provide an electrical contact path to the optoelectronic devices and limit electromagnetic interference. In yet another embodiment, a window may be formed in the head region of the mounting structure so as to provide access to the heat spreader. Optoelectronic devices may be adapted to the heat spreader in such a manner that the devices are accessible through the window in the mounting structure.

  1. US SoAtl VA Site Consumption

    U.S. Energy Information Administration (EIA) Indexed Site

    SoAtl VA Site Consumption million Btu $0 $500 $1,000 $1,500 $2,000 $2,500 US SoAtl VA Expenditures dollars ALL ENERGY average per household (excl. transportation) 0 4,000 8,000 12,000 16,000 US SoAtl VA Site Consumption kilowatthours $0 $300 $600 $900 $1,200 $1,500 $1,800 US SoAtl VA Expenditures dollars ELECTRICITY ONLY average per household * Virginia households consume an average of 86 million Btu per year, about 4% less than the U.S. average. * Average electricity consumption and costs are

  2. Mounting for ceramic scroll

    DOE Patents [OSTI]

    Petty, Jack D.

    1993-01-01

    A mounting for a ceramic scroll on a metal engine block of a gas turbine engine includes a first ceramic ring and a pair of cross key connections between the first ceramic ring, the ceramic scroll, and the engine block. The cross key connections support the scroll on the engine block independent of relative radial thermal growth and for bodily movement toward an annular mounting shoulder on the engine. The scroll has an uninterrupted annular shoulder facing the mounting shoulder on the engine block. A second ceramic ring is captured between mounting shoulder and the uninterrupted shoulder on the scroll when the latter is bodily shifted toward the mouting shoulder to define a gas seal between the scroll and the engine block.

  3. DOE - Office of Legacy Management -- Mobil Oil Corp - VA 01

    Office of Legacy Management (LM)

    Mobil Oil Corp - VA 01 FUSRAP Considered Sites Site: Mobil Oil Corp. (VA.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: ...

  4. Energy Department Recognizes City of Roanoke, VA for Leadership...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recognizes City of Roanoke, VA for Leadership in Better Buildings Challenge Energy Department Recognizes City of Roanoke, VA for Leadership in Better Buildings Challenge January ...

  5. Housing And Mounting Structure

    DOE Patents [OSTI]

    Anderson, Gene R.; Armendariz, Marcelino G.; Baca, Johnny R.F.; Bryan, Robert P.; Carson, Richard F.; Duckett, III, Edwin B.; McCormick, Frederick B.; Miller, Gregory V.; Peterson, David W.; Smith, Terrance T.

    2005-03-08

    This invention relates to an optical transmitter, receiver or transceiver module, and more particularly, to an apparatus for connecting a first optical connector to a second optical connector. The apparatus comprises: (1) a housing having at least a first end and at least a second end, the first end of the housing capable of receiving the first optical connector, and the second end of the housing capable of receiving the second optical connector; (2) a longitudinal cavity extending from the first end of the housing to the second end of the housing; and (3) an electromagnetic shield comprising at least a portion of the housing. This invention also relates to an apparatus for housing a flexible printed circuit board, and this apparatus comprises: (1) a mounting structure having at least a first surface and a second surface; (2) alignment ridges along the first and second surfaces of the mounting structure, the alignment ridges functioning to align and secure a flexible printed circuit board that is wrapped around and attached to the first and second surfaces of the mounting structure; and (3) a series of heat sink ridges adapted to the mounting structure, the heat sink ridges functioning to dissipate heat that is generated from the flexible printed circuit board.

  6. MountPointAttributes

    Energy Science and Technology Software Center (OSTI)

    2001-06-16

    MountPointAttributes is a software component that provides client code with a technique to raise the local namespace of a file to a global namespace. Its abstractions and mechanisms allow the client code to gather global properties of a file and to use them in devising an effective storage access strategy on this file.

  7. Plasma Screen Floating Mount

    DOE Patents [OSTI]

    Eakle, Robert F.; Pak, Donald J.

    2004-10-26

    A mounting system for a flat display screen, particularly a plasma display screen, suspends the screen separately in each of the x-, y- and z-directions. A series of frames located by linear bearings and isolated by springs and dampers allows separate controlled movement in each axis. The system enables the use of relatively larger display screens in vehicles in which plasma screen are subject to damage from vibration.

  8. QER- Comment of RI Office of Energy Resources

    Broader source: Energy.gov [DOE]

    Hi Matt, Please find additional materials from the RI Office of Energy Resources for the DOE QER. The documents attached include: 1) A powerpoint providing an overview of the RI State Energy Plan - the plan will be officially released in Fall, 2014; 2) Testimony to the RI Senate which outlines the need for coordinated work on the gas and electric infrastructure in New England; 3) A powerpoint version of the written testimony; 4) The 2013 Annual Report on the RI Energy Efficiency Program.

  9. Surface mount component jig

    DOE Patents [OSTI]

    Kronberg, James W.

    1990-08-07

    A device for bending and trimming the pins of a dual-inline-package component and the like for surface mounting rather than through mounting to a circuit board comprises, in a first part, in pin cutter astride a holder having a recess for holding the component, a first spring therebetween, and, in a second part, two flat members pivotally interconnected by a hinge and urged to an upward peaked position from a downward peaked position by a second spring. As a downward force is applied to the pin cutter it urges the holder downward, assisted by the first spring and a pair of ridges riding on shoulders of the holder, to carry the component against the upward peaked flat members which guide the pins outwardly. As the holder continues downwardly, the flat members pivot to the downward peaked position bending the pins upwardly against the sides of the holder. When the downward movement is met with sufficient resistance, the ridges of the pin cutter ride over the holder's shoulders to continue downward to cut any excess length of pin.

  10. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Energy Savers [EERE]

    08: Debian Security Advisory V-008: Debian Security Advisory October 23, 2012 - 6:00am Addthis PROBLEM: Debian Security Advisory PLATFORM: Debian GNU/Linux 6.0 ABSTRACT: Debian update for bind9 REFERENCE LINKS: Debian Security Advisory DSA-2560-1 Debian bugtracking system: Bug 690118 ISC Reference Number: AA-00801 Secunia Advisory SA51054 CVE-2012-5166 IMPACT ASSESSMENT: Medium DISCUSSION: was discovered that BIND, a DNS server, hangs while constructing the additional section of a DNS reply,

  11. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Energy Savers [EERE]

    2 1 Smart Grid Demonstration Project Locations NH MA 16 Awards Support Projects in 21 States

  12. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Energy Savers [EERE]

    7 2 1 Energy Storage Demonstration Project Locations NH 16 Awards Support Projects in 9 States MA

  13. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 1 Locations of Smart Grid Demonstration and Large-Scale Energy Storage Projects NH 32 Awards Support Projects in 24 States 6 11 MA

  14. DOE - Office of Legacy Management -- C I Haynes Inc - RI 02

    Office of Legacy Management (LM)

    Evaluation Year: 1994 RI.02-2 RI.02-3 Site Operations: Performed limited scale tests on heat treating uranium in a vacuum cold-wall furnace in 1964 RI.02-1 Site Disposition: ...

  15. 2012 APS-DPP Plasma Science Expo, Providence, RI | Princeton...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APS-DPP Plasma Science Expo, Providence, RI View larger image IMG 1847 View larger image IMG 1598 View larger image IMG 1608 View larger image IMG 1609 View larger image IMG 1614...

  16. Photovoltaic array mounting apparatus, systems, and methods ...

    Office of Scientific and Technical Information (OSTI)

    Patent: Photovoltaic array mounting apparatus, systems, and methods Citation Details In-Document Search Title: Photovoltaic array mounting apparatus, systems, and methods An ...

  17. Solar panel truss mounting systems and methods

    DOE Patents [OSTI]

    Al-Haddad, Tristan Farris; Cavieres, Andres; Gentry, Russell; Goodman, Joseph; Nolan, Wade; Pitelka, Taylor; Rahimzadeh, Keyan; Brooks, Bradley; Lohr, Joshua; Crooks, Ryan; Porges, Jamie; Rubin, Daniel

    2015-10-20

    An exemplary embodiment of the present invention provides a solar panel truss mounting system comprising a base and a truss assembly coupled to the base. The truss assembly comprises a first panel rail mount, second panel rail mount parallel to the first panel rail mount, base rail mount parallel to the first and second panel rail mounts, and a plurality of support members. A first portion of the plurality of support members extends between the first and second panel rail mounts. A second portion of the plurality of support members extends between the first panel rail mount and the base rail mount. A third portion of the plurality of support members extends between the second panel rail mount and the base rail mount. The system can further comprise a plurality of connectors for coupling a plurality of photovoltaic solar panels to the truss assembly.

  18. VIBRATION DAMPING AND SHOCK MOUNT

    DOE Patents [OSTI]

    Stevens, D.J.; Forman, G.W.

    1963-12-10

    A shock absorbing mount in which vibrations are damped by an interference fit between relatively movable parts of the mount is described. A pair of generally cup-shaped parts or members have skirt portions disposed in an oppositely facing nesting relationship with the skirt of one member frictionally engaging the skirt of the other. The outermost skirt may be slotted to provide spring-like segments which embrace the inner skirt for effecting the interference fit. Belleville washers between the members provide yieldable support for a load carried by the mount. When a resonant frequency of vibration forces acting upon the moumt attains a certain level the kinetic energy of these forces is absorbed by sliding friction between the parts. (AEC)

  19. Mounting support for a photovoltaic module

    DOE Patents [OSTI]

    Brandt, Gregory Michael; Barsun, Stephan K.; Coleman, Nathaniel T.; Zhou, Yin

    2013-03-26

    A mounting support for a photovoltaic module is described. The mounting support includes a foundation having an integrated wire-way ledge portion. A photovoltaic module support mechanism is coupled with the foundation.

  20. Hydrogen Production and Dispensing Facility Opens at W. Va. Airport

    Broader source: Energy.gov [DOE]

    A hydrogen production and dispensing station constructed and operated with support from the Office of Fossil Energy's National Energy Technology Laboratory was officially opened Monday at the Yeager Airport in Charleston, W.Va.

  1. DOE - Office of Legacy Management -- Naval Proving Ground - VA...

    Office of Legacy Management (LM)

    Number 11. VA.0-01-2 - Accountable Station List; U.S. AEC Source and Special Nuclear Materials Accountability Station Symbols; Santa Fe Operations Section; Page 7; June 30, 1955...

  2. VA-3-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-B Wholesale Power Rate Schedule VA-3-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  3. VA-4-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  4. VA-1-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-B Wholesale Power Rate Schedule VA-1-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  5. VA-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Environmental Management (EM)

    2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and...

  6. Holding fixture for metallographic mount polishing

    DOE Patents [OSTI]

    Barth, Clyde H.; Cramer, Charles E.

    1997-01-01

    A fixture for holding mounted specimens for polishing, having an arm; a body attached to one end of the arm, the body having at least one flange having an opening to accommodate a mounted specimen; and a means applying pressure against the outer surface of the mounted specimen to hold the specimen in contact with the polishing surface.

  7. Holding fixture for metallographic mount polishing

    DOE Patents [OSTI]

    Barth, C.H.; Cramer, C.E.

    1997-12-30

    A fixture is described for holding mounted specimens for polishing, having an arm; a body attached to one end of the arm, the body having at least one flange having an opening to accommodate a mounted specimen; and a means applying pressure against the outer surface of the mounted specimen to hold the specimen in contact with the polishing surface. 3 figs.

  8. Nozzle and shroud assembly mounting structure

    DOE Patents [OSTI]

    Faulder, Leslie J.; Frey, deceased, Gary A.; Nielsen, Engward W.; Ridler, Kenneth J.

    1997-01-01

    The present nozzle and shroud assembly mounting structure configuration increases component life and reduces maintenance by reducing internal stress between the mounting structure having a preestablished rate of thermal expansion and the nozzle and shroud assembly having a preestablished rate of thermal expansion being less than that of the mounting structure. The mounting structure includes an outer sealing portion forming a cradling member in which an annular ring member is slidably positioned. The mounting structure further includes an inner mounting portion to which a hooked end of the nozzle and shroud assembly is attached. As the inner mounting portion expands and contracts, the nozzle and shroud assembly slidably moves within the outer sealing portion.

  9. Dual resolution, vacuum compatible optical mount

    DOE Patents [OSTI]

    Halpin, John Michael (Tracy, CA)

    2011-10-04

    An optical mount for an optical element includes a mounting plate, a lever arm pivot coupled to mounting plate, and an adjustment plate. The optical mount also includes a flexure pivot mechanically coupling the adjustment plate to the mounting plate and a lever arm. The optical mount further includes a first adjustment device extending from the adjustment plate to make contact with the lever arm at a first contact point. A projection of a line from the first contact point to a pivot point, measured along the lever arm, is a first predetermined distance. The optical mount additionally includes a second adjustment device extending from the adjustment plate to make contact with the lever arm at a second contact point. A projection of a line from the second contact point to the pivot point, measured along the lever arm, is a second predetermined distance greater than the first predetermined distance.

  10. Nozzle and shroud assembly mounting structure

    DOE Patents [OSTI]

    Faulder, L.J.; Frey, G.A.; Nielsen, E.W.; Ridler, K.J.

    1997-08-05

    The present nozzle and shroud assembly mounting structure configuration increases component life and reduces maintenance by reducing internal stress between the mounting structure having a preestablished rate of thermal expansion and the nozzle and shroud assembly having a preestablished rate of thermal expansion being less than that of the mounting structure. The mounting structure includes an outer sealing portion forming a cradling member in which an annular ring member is slidably positioned. The mounting structure further includes an inner mounting portion to which a hooked end of the nozzle and shroud assembly is attached. As the inner mounting portion expands and contracts, the nozzle and shroud assembly slidably moves within the outer sealing portion. 3 figs.

  11. Ch 13 RI Print Ready 4-27-16

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 - CHAPTER 13 This page intentionally left blank Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Eastern United States April 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies Federal Communications Commission General Services Administration U.S. Department of Agriculture-Rural

  12. THE UBV(RI){sub C} COLORS OF THE SUN

    SciTech Connect (OSTI)

    Ramirez, I.; Michel, R.; Schuster, W. J.; Sefako, R.; Van Wyk, F.; Tucci Maia, M.; Melendez, J.; Castilho, B. V.

    2012-06-10

    Photometric data in the UBV(RI){sub C} system have been acquired for 80 solar analog stars for which we have previously derived highly precise atmospheric parameters T{sub eff}, log g, and [Fe/H] using high-resolution, high signal-to-noise ratio spectra. UBV and (RI){sub C} data for 46 and 76 of these stars, respectively, are published for the first time. Combining our data with those from the literature, colors in the UBV(RI){sub C} system, with {approx_equal} 0.01 mag precision, are now available for 112 solar analogs. Multiple linear regression is used to derive the solar colors from these photometric data and the spectroscopically derived T{sub eff}, log g, and [Fe/H] values. To minimize the impact of systematic errors in the model-dependent atmospheric parameters, we use only the data for the 10 stars that most closely resemble our Sun, i.e., the solar twins, and derive the following solar colors: (B - V){sub Sun} = 0.653 {+-} 0.005, (U - B){sub Sun} = 0.166 {+-} 0.022, (V - R){sub Sun} = 0.352 {+-} 0.007, and (V - I){sub Sun} = 0.702 {+-} 0.010. These colors are consistent, within the 1{sigma} errors, with those derived using the entire sample of 112 solar analogs. We also derive the solar colors using the relation between spectral-line-depth ratios and observed stellar colors, i.e., with a completely model-independent approach, and without restricting the analysis to solar twins. We find (B - V){sub Sun} = 0.653 {+-} 0.003, (U - B){sub Sun} = 0.158 {+-} 0.009, (V - R){sub Sun} = 0.356 {+-} 0.003, and (V - I){sub Sun} = 0.701 {+-} 0.003, in excellent agreement with the model-dependent analysis.

  13. Ocean floor mounting of wave energy converters

    DOE Patents [OSTI]

    Siegel, Stefan G

    2015-01-20

    A system for mounting a set of wave energy converters in the ocean includes a pole attached to a floor of an ocean and a slider mounted on the pole in a manner that permits the slider to move vertically along the pole and rotate about the pole. The wave energy converters can then be mounted on the slider to allow adjustment of the depth and orientation of the wave energy converters.

  14. Mount St. Mary's Abbey | Open Energy Information

    Open Energy Info (EERE)

    Energy Developments Energy Purchaser Mount St. Mary's Abbey Location Wrentham MA Coordinates 42.033096, -71.393711 Show Map Loading map... "minzoom":false,"mappings...

  15. Plasma Screen Floating Mount - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The floating mount also provides added protection to equipment investment during transit or for shipping. SRNL integrated this technology for use in a mobile laboratory van....

  16. SwRI's HEDGE Technology for High Efficiency, Low Emissions Gasoline...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Engine Technologies and an Introduction to SwRI's Dedicated EGR Concept Development of Dual-Fuel Engine for Class 8 Applications Gasoline Ultra Fuel Efficient Vehicle...

  17. Three-point spherical mirror mount

    DOE Patents [OSTI]

    Cutburth, R.W.

    1984-01-23

    A three-point spherical mirror mount for use with lasers is disclosed. The improved mirror mount is adapted to provide a pivot ring having an outer surface with at least three spaced apart mating points to engage an inner spherical surface of a support housing.

  18. Portsmouth RI/FS Report for the Process Buildings and Complex Facilities

    Energy Savers [EERE]

    Decontamination and Decommissioning Evaluation Project | Department of Energy Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project Portsmouth RI/FS Report for the Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project This remedial investigation/feasibility study (RI/FS), the Remedial Investigation and Feasibility Study Report for the Process Buildings and Complex Facilities Decontamination and

  19. Microsoft Word - va_Final3a_06-04-032.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    vaFinal3a06-04-032.doc Microsoft Word - vaFinal3a06-04-032.doc PDF icon Microsoft Word - vaFinal3a06-04-032.doc More Documents & Publications DOE F 473.2 Headquarters ...

  20. Vibration dissipation mount for motors or the like

    DOE Patents [OSTI]

    Small, Thomas R.

    1987-01-01

    A vibration dissipation mount which permits the mounting of a motor, generator, or the like such that the rotatable shaft thereof passes through the mount and the mount permits the dissipation of self-induced and otherwise induced vibrations wherein the mount comprises a pair of plates having complementary concave and convex surfaces, a semi-resilient material being disposed therebetween.

  1. Motorized control for mirror mount apparatus

    DOE Patents [OSTI]

    Cutburth, Ronald W.

    1989-01-01

    A motorized control and automatic braking system for adjusting mirror mount apparatus is disclosed. The motor control includes a planetary gear arrangement to provide improved pitch adjustment capability while permitting a small packaged design. The motor control for mirror mount adjustment is suitable for laser beam propagation applications. The brake is a system of constant contact, floating detents which engage the planetary gear at selected between-teeth increments to stop rotation instantaneously when the drive motor stops.

  2. Remedial Investigation/Feasibility Study (RI/FS) process, elements and techniques guidance

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This manual provides detailed guidance on Remedial Investigation/Feasibility Studies (RI/FSs) conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at Department of Energy (DOE) facilities. The purpose of the RI/FS, to assess the risk posed by a hazardous waste site and to determine the best way to reduce that risk, and its structure (site characterization, risk assessment, screening and detailed analysis of alternatives, etc.) is defined in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and further explained in the Environmental Protection Agency`s (EPA`s) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (Interim Final) 540/G-89/004, OSWER Directive 9355.3-01, October 1988. Though issued in 1988, the EPA guidance remains an excellent source of information on the conduct and structure of an RI/FS. This document makes use of supplemental RI/FS-related guidance that EPA has developed since its initial document was issued in 1988, incorporates practical lessons learned in more than 12 years of experience in CERCLA hazardous site remediation, and drawing on those lessons, introduces the Streamlined Approach For Environmental Restoration (SAFER), developed by DOE as a way to proceed quickly and efficiently through the RI/FS process at DOE facilities. Thus as its title implies, this guidance is intended to describe in detail the process and component elements of an RI/FS, as well as techniques to manage the RI/FS effectively.

  3. Mount Princeton Area Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Area Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Mount Princeton Area Space Heating Low Temperature Geothermal Facility Facility Mount...

  4. Department of Veterans Affairs, FONSI - Ground mounted solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ground mounted solar photovoltaic power at San Joaquin National Cemetery Department of Veterans Affairs, FONSI - Ground mounted solar photovoltaic power at San Joaquin National ...

  5. WA_01_018_IBM_Waiver_of_Governement_US_and_Foreign_Patent_Ri.pdf |

    Energy Savers [EERE]

    Department of Energy 1_018_IBM_Waiver_of_Governement_US_and_Foreign_Patent_Ri.pdf WA_01_018_IBM_Waiver_of_Governement_US_and_Foreign_Patent_Ri.pdf PDF icon WA_01_018_IBM_Waiver_of_Governement_US_and_Foreign_Patent_Ri.pdf More Documents & Publications WA_04_053_IBM_CORP_Waiver_of_the_Government_U.S._and_Foreign.pdf WA_00_015_COMPAQ_FEDERAL_LLC_Waiver_Domestic_and_Foreign_Pat.pdf Advance Patent Waiver W(A)2002-023

  6. Ball mounting fixture for a roundness gage

    DOE Patents [OSTI]

    Gauler, A.L.; Pasieka, D.F.

    1983-11-15

    A ball mounting fixture for a roundness gage is disclosed. The fixture includes a pair of chuck assemblies oriented substantially transversely with respect to one another and mounted on a common base. Each chuck assembly preferably includes a rotary stage and a wobble plate affixed thereto. A ball chuck affixed to each wobble plate is operable to selectively support a ball to be measured for roundness, with the wobble plate permitting the ball chuck to be tilted to center the ball on the axis of rotation of the rotary stage. In a preferred embodiment, each chuck assembly includes a vacuum chuck operable to selectively support the ball to be measured for roundness. The mounting fixture enables a series of roundness measurements to be taken with a conventional rotating gagehead roundness instrument, which measurements can be utilized to determine the sphericity of the ball. 6 figs.

  7. Ball mounting fixture for a roundness gage

    DOE Patents [OSTI]

    Gauler, Allen L. (Los Alamos, NM); Pasieka, Donald F. (Los Alamos, NM)

    1983-01-01

    A ball mounting fixture for a roundness gage is disclosed. The fixture includes a pair of chuck assemblies oriented substantially transversely with respect to one another and mounted on a common base. Each chuck assembly preferably includes a rotary stage and a wobble plate affixed thereto. A ball chuck affixed to each wobble plate is operable to selectively support a ball to be measured for roundness, with the wobble plate permitting the ball chuck to be tilted to center the ball on the axis of rotation of the rotary stage. In a preferred embodiment, each chuck assembly includes a vacuum chuck operable to selectively support the ball to be measured for roundness. The mounting fixture enables a series of roundness measurements to be taken with a conventional rotating gagehead roundness instrument, which measurements can be utilized to determine the sphericity of the ball.

  8. Structure of Fc[gamma]RI in complex with Fc reveals the importance...

    Office of Scientific and Technical Information (OSTI)

    complex with Fc reveals the importance of glycan recognition for high-affinity IgG binding Citation Details In-Document Search Title: Structure of FcgammaRI in complex with Fc ...

  9. Sensor mount assemblies and sensor assemblies

    DOE Patents [OSTI]

    Miller, David H.

    2012-04-10

    Sensor mount assemblies and sensor assemblies are provided. In an embodiment, by way of example only, a sensor mount assembly includes a busbar, a main body, a backing surface, and a first finger. The busbar has a first end and a second end. The main body is overmolded onto the busbar. The backing surface extends radially outwardly relative to the main body. The first finger extends axially from the backing surface, and the first finger has a first end, a second end, and a tooth. The first end of the first finger is disposed on the backing surface, and the tooth is formed on the second end of the first finger.

  10. Cummins Rocky Mount Engine Plant | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rocky Mount Engine Plant Cummins Rocky Mount Engine Plant sep_logo_borderless.jpg This presentation by Cummins, Inc. at the 2015 World Energy Engineering Congress shares the Rocky Mount Engine Plant's experience with achieving certification to Superior Energy Performance® (SEP(tm)) and ISO 50001. PDF icon Cummins Rocky Mount Engine Plant (September 2015) More Documents & Publications SEP Case Study Webinar: Cummins Slides The Cummins Rocky Mount Engine Plant Case Study Superior Energy

  11. PC board mount corrosion sensitive sensor

    DOE Patents [OSTI]

    Robinson, Alex L.; Casias, Adrian L.; Pfeifer, Kent B.; Laguna, George R.

    2016-03-22

    The present invention relates to surface mount structures including a capacitive element or a resistive element, where the element has a property that is responsive to an environmental condition. In particular examples, the structure can be optionally coupled to a printed circuit board. Other apparatuses, surface mountable structures, and methods of use are described herein.

  12. Fixture for mounting small parts for processing

    DOE Patents [OSTI]

    Foreman, Larry R.; Gomez, Veronica M.; Thomas, Michael H.

    1990-01-01

    A fixture for mounting small parts, such as fusion target spheres or microelectronic components. A glass stalk is drawn and truncated near its tip. The truncated end of the glass stalk is dipped into silicone rubber forming an extending streamer. After the rubber cures for approximately 24 hours, a small part is touched to the streamer, and will be held securely throughout processing.

  13. Photovoltaic module mounting clip with integral grounding

    DOE Patents [OSTI]

    Lenox, Carl J.

    2010-08-24

    An electrically conductive mounting/grounding clip, usable with a photovoltaic (PV) assembly of the type having an electrically conductive frame, comprises an electrically conductive body. The body has a central portion and first and second spaced-apart arms extending from the central portion. Each arm has first and second outer portions with frame surface-disrupting element at the outer portions.

  14. Contract Connections @ ChallengeHER, Norfolk VA, October 14 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Contract Connections @ ChallengeHER, Norfolk VA, October 14 Contract Connections @ ChallengeHER, Norfolk VA, October 14 The U.S. Small Business Administration (SBA), Women Impacting Public Policy (WIPP), and American Express OPEN have partnered to host this special FREE contracting event for women business owners. American Express OPEN will hold a Contract Connections session at the ChallengeHER - Norfolk Event, on October 14th, 2014 at the Webb University Center, Norfolk, VA. PDF

  15. KENO V.a Primer: A Primer for Criticality Calculations with SCALE/KENO V.a Using CSPAN for Input

    SciTech Connect (OSTI)

    Busch, R.D.

    2003-01-17

    The SCALE (Standardized Computer Analyses for Licensing Evaluation) computer software system developed at Oak Ridge National Laboratory (ORNL) is widely used and accepted around the world for criticality safety analyses. The well-known KENO V.a three-dimensional Monte Carlo criticality computer code is the primary criticality safety analysis tool in SCALE. The KENO V.a primer is designed to help a new user understand and use the SCALE/KENO V.a Monte Carlo code for nuclear criticality safety analyses. It assumes that the user has a college education in a technical field. There is no assumption of familiarity with Monte Carlo codes in general or with SCALE/KENO V.a in particular. The primer is designed to teach by example, with each example illustrating two or three features of SCALE/KENO V.a that are useful in criticality analyses. The primer is based on SCALE 4.4a, which includes the Criticality Safety Processor for Analysis (CSPAN) input processor for Windows personal computers (PCs). A second edition of the primer, which uses the new KENO Visual Editor, is currently under development at ORNL and is planned for publication in late 2003. Each example in this first edition of the primer uses CSPAN to provide the framework for data input. Starting with a Quickstart section, the primer gives an overview of the basic requirements for SCALE/KENO V.a input and allows the user to quickly run a simple criticality problem with SCALE/KENO V.a. The sections that follow Quickstart include a list of basic objectives at the beginning that identifies the goal of the section and the individual SCALE/KENO V.a features which are covered in detail in the example problems in that section. Upon completion of the primer, a new user should be comfortable using CSPAN to set up criticality problems in SCALE/KENO V.a.

  16. Micro-inverter solar panel mounting

    DOE Patents [OSTI]

    Morris, John; Gilchrist, Phillip Charles

    2016-02-02

    Processes, systems, devices, and articles of manufacture are provided. Each may include adapting micro-inverters initially configured for frame-mounting to mounting on a frameless solar panel. This securement may include using an adaptive clamp or several adaptive clamps secured to a micro-inverter or its components, and using compressive forces applied directly to the solar panel to secure the adaptive clamp and the components to the solar panel. The clamps can also include compressive spacers and safeties for managing the compressive forces exerted on the solar panels. Friction zones may also be used for managing slipping between the clamp and the solar panel during or after installation. Adjustments to the clamps may be carried out through various means and by changing the physical size of the clamps themselves.

  17. Adjustable link for kinematic mounting systems

    DOE Patents [OSTI]

    Hale, L.C.

    1997-07-01

    An adjustable link for kinematic mounting systems is disclosed. The adjustable link is a low-cost, passive device that provides backlash-free adjustment along its single constraint direction and flexural freedom in all other directions. The adjustable link comprises two spheres, two sockets in which the spheres are adjustable retain, and a connection link threadly connected at each end to the spheres, to provide a single direction of restraint and to adjust the length or distance between the sockets. Six such adjustable links provide for six degrees of freedom for mounting an instrument on a support. The adjustable link has applications in any machine or instrument requiring precision adjustment in six degrees of freedom, isolation from deformations of the supporting platform, and/or additional structural damping. The damping is accomplished by using a hollow connection link that contains an inner rod and a viscoelastic separation layer between the two. 3 figs.

  18. Adjustable link for kinematic mounting systems

    DOE Patents [OSTI]

    Hale, Layton C.

    1997-01-01

    An adjustable link for kinematic mounting systems. The adjustable link is a low-cost, passive device that provides backlash-free adjustment along its single constraint direction and flexural freedom in all other directions. The adjustable link comprises two spheres, two sockets in which the spheres are adjustable retain, and a connection link threadly connected at each end to the spheres, to provide a single direction of restraint and to adjust the length or distance between the sockets. Six such adjustable links provide for six degrees of freedom for mounting an instrument on a support. The adjustable link has applications in any machine or instrument requiring precision adjustment in six degrees of freedom, isolation from deformations of the supporting platform, and/or additional structural damping. The damping is accomplished by using a hollow connection link that contains an inner rod and a viscoelastic separation layer between the two.

  19. Fixture for mounting small parts for processing

    DOE Patents [OSTI]

    Foreman, L.R.; Gomez, V.M.; Thomas, M.H.

    1990-05-29

    A fixture for mounting small parts, such as fusion target spheres or microelectronic components is disclosed. A glass stalk is drawn and truncated near its tip. The truncated end of the glass stalk is dipped into silicone rubber forming an extending streamer. After the rubber cures for approximately 24 hours, a small part is touched to the streamer, and will be held securely throughout processing. 5 figs.

  20. Conceptual design for PSP mounting bracket

    SciTech Connect (OSTI)

    Ransom, G.; Stein, R.

    1991-12-31

    Protective structural packages (PSP`s or overpacks) used to ship 2 1/2-ton UF{sub 6} product cylinders are bolted to truck trailers. All bolts penetrate two longitudinal rows of wooden planks. Removal and replacement is required at various intervals for maintenance and routine testing. A conceptual design is presented for mounting brackets which would securely attach PSP`s to trailer frames, reduce removal and replacement time, and minimize risk of personnel injury.

  1. City of Mount Dora, Florida (Utility Company) | Open Energy Informatio...

    Open Energy Info (EERE)

    Dora, Florida (Utility Company) Jump to: navigation, search Name: City of Mount Dora Place: Florida Phone Number: (352) 735-7151 Website: ci.mount-dora.fl.usindex.aspx Twitter:...

  2. Mounting apparatus for a nozzle guide vane assembly

    DOE Patents [OSTI]

    Boyd, G.L.; Shaffer, J.E.

    1995-09-12

    The present invention provides a ceramic nozzle guide assembly with an apparatus for mounting it to a metal nozzle case that includes an intermediate ceramic mounting ring. The mounting ring includes a plurality of projections that are received within a plurality of receptacles formed in the nozzle case. The projections of the mounting ring are secured within the receptacles by a ceramic retainer that allows contact between the two components only along arcuate surfaces thus eliminating sliding contact between the components. 8 figs.

  3. Mounting apparatus for a nozzle guide vane assembly

    DOE Patents [OSTI]

    Boyd, Gary L. (Alpine, CA); Shaffer, James E. (Maitland, FL)

    1995-01-01

    The present invention provides a ceramic nozzle guide assembly with an apparatus for mounting it to a metal nozzle case that includes an intermediate ceramic mounting ring. The mounting ring includes a plurality of projections that are received within a plurality of receptacles formed in the nozzle case. The projections of the mounting ring are secured within the receptacles by a ceramic retainer that allows contact between the two components only along arcuate surfaces thus eliminating sliding contact between the components.

  4. Structure of Fc[gamma]RI in complex with Fc reveals the importance of

    Office of Scientific and Technical Information (OSTI)

    glycan recognition for high-affinity IgG binding (Journal Article) | SciTech Connect Structure of Fc[gamma]RI in complex with Fc reveals the importance of glycan recognition for high-affinity IgG binding Citation Details In-Document Search Title: Structure of Fc[gamma]RI in complex with Fc reveals the importance of glycan recognition for high-affinity IgG binding Authors: Lu, Jinghua ; Chu, Jonathan ; Zou, Zhongcheng ; Hamacher, Nels B. ; Rixon, Mark W. ; Sun, Peter D. [1] ; BMS) [2] + Show

  5. DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Custom Home | Department of Energy Study, Caldwell and Johnson, Exeter, RI, Custom Home DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home Case study of a DOE Zero Energy Ready Home in Exeter, Rhode Island, that scored HERS 43 without PV. This 2,000 ft2 custom home has a spray- foamed attic and walls, plus rigid foam sheathing, ducted mini-split heat pumps, and an HRV. PDF icon BA_ZeroEnergyReady_CaldwellJohnson_062314.pdf More Documents & Publications

  6. RFI/RI work plan for the Road A Chemical Basin 904-111G

    SciTech Connect (OSTI)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  7. Photovoltaic module mounting clip with integral grounding

    DOE Patents [OSTI]

    Lenox, Carl J.

    2008-10-14

    An electrically conductive mounting/grounding clip, for use with a photovoltaic assembly of the type having an electrically conductive frame, comprises an electrically conductive body. The body has a central portion and first and second spaced-apart arms extending generally perpendicular to the central portion. Each arm has an outer portion with each outer portion having an outer end. At least one frame surface-disrupting element is at each outer end. The central portion defines a plane with the frame surface-disrupting elements pointing towards the plane. In some examples each arm extends from the central portion at an acute angle to the plane.

  8. W.Va. Mom Sees Benefits of Weatherization | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    W.Va. Mom Sees Benefits of Weatherization W.Va. Mom Sees Benefits of Weatherization April 2, 2010 - 2:43pm Addthis Joshua DeLung Not only is Rachael McCarty working full-time and going to college, but also she's a full-time single mom of two small children. After moving to Bluefield, W.Va., from California a few years ago, Rachel bought her first home, a property that needed some work. "It's a very, very old house, and it didn't really have any insulation," she says. Last year, Rachael

  9. DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI

    Broader source: Energy.gov [DOE]

    Case study of a DOE Zero Energy Ready affordable home in Charlestown, RI, that achieved a HERS Index of 47 without PV. The 2,244-ft2 two-story home with basement has 2x6 walls filled with 5.5 in. ...

  10. KP-VA-3-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-C Wholesale Power Rate Schedule KP-VA-3-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and ...

  11. KP-VA-1-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-C Wholesale Power Rate Schedule KP-VA-1-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and ...

  12. KP-VA-2-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-C Wholesale Power Rate Schedule KP-VA-2-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and ...

  13. KP-VA-4-C Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-C Wholesale Power Rate Schedule KP-VA-4-C Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and ...

  14. DOE Zero Energy Ready Home Case Study: Promethean Homes, Charlottesville, VA

    Broader source: Energy.gov [DOE]

    Case study of a DOE Zero Energy Ready home in Charlottesville, VA, that achieves a HERS 33 without PV. The 2,572-ft2 custom home with daylight basement, has 2x6 advanced framed walls filled with R...

  15. Reusable vibration resistant integrated circuit mounting socket

    DOE Patents [OSTI]

    Evans, Craig N.

    1995-01-01

    This invention discloses a novel form of socket for integrated circuits to be mounted on printed circuit boards. The socket uses a novel contact which is fabricated out of a bimetallic strip with a shape which makes the end of the strip move laterally as temperature changes. The end of the strip forms a barb which digs into an integrated circuit lead at normal temperatures and holds it firmly in the contact, preventing loosening and open circuits from vibration. By cooling the contact containing the bimetallic strip the barb end can be made to release so that the integrated circuit lead can be removed from the socket without damage either to the lead or to the socket components.

  16. Rack assembly for mounting solar modules

    DOE Patents [OSTI]

    Plaisted, Joshua Reed; West, Brian

    2012-09-04

    A rack assembly is provided for mounting solar modules over an underlying body. The rack assembly may include a plurality of rail structures that are arrangeable over the underlying body to form an overall perimeter for the rack assembly. One or more retention structures may be provided with the plurality of rail structures, where each retention structure is configured to support one or more solar modules at a given height above the underlying body. At least some of the plurality of rail structures are adapted to enable individual rail structures to be sealed over the underlying body so as to constrain air flow underneath the solar modules. Additionally, at least one of (i) one or more of the rail structures, or (ii) the one or more retention structures are adjustable so as to adapt the rack assembly to accommodate solar modules of varying forms or dimensions.

  17. Rack assembly for mounting solar modules

    DOE Patents [OSTI]

    Plaisted, Joshua Reed; West, Brian

    2010-12-28

    A rack assembly is provided for mounting solar modules over an underlying body. The rack assembly may include a plurality of rail structures that are arrangeable over the underlying body to form an overall perimeter for the rack assembly. One or more retention structures may be provided with the plurality of rail structures, where each retention structure is configured to support one or more solar modules at a given height above the underlying body. At least some of the plurality of rail structures are adapted to enable individual rail structures o be sealed over the underlying body so as to constrain air flow underneath the solar modules. Additionally, at least one of (i) one or more of the rail structures, or (ii) the one or more retention structures are adjustable so as to adapt the rack assembly to accommodate solar modules of varying forms or dimensions.

  18. Article mounting and position adjustment stage

    DOE Patents [OSTI]

    Cutburth, R.W.; Silva, L.L.

    1988-05-10

    An improved adjustment and mounting stage of the type used for the detection of laser beams is disclosed. A ring sensor holder has locating pins on a first side thereof which are positioned within a linear keyway in a surrounding housing for permitting reciprocal movement of the ring along the keyway. A rotatable ring gear is positioned within the housing on the other side of the ring from the linear keyway and includes an oval keyway which drives the ring along the linear keyway upon rotation of the gear. Motor-driven single-stage and dual (x, y) stage adjustment systems are disclosed which are of compact construction and include a large laser transmission hole. 6 figs.

  19. Article mounting and position adjustment stage

    DOE Patents [OSTI]

    Cutburth, Ronald W.; Silva, Leonard L.

    1988-01-01

    An improved adjustment and mounting stage of the type used for the detection of laser beams is disclosed. A ring sensor holder has locating pins on a first side thereof which are positioned within a linear keyway in a surrounding housing for permitting reciprocal movement of the ring along the keyway. A rotatable ring gear is positioned within the housing on the other side of the ring from the linear keyway and includes an oval keyway which drives the ring along the linear keyway upon rotation of the gear. Motor-driven single-stage and dual (x, y) stage adjustment systems are disclosed which are of compact construction and include a large laser transmission hole.

  20. Photovoltaic array mounting apparatus, systems, and methods

    DOE Patents [OSTI]

    West, John Raymond; Atchley, Brian; Hudson, Tyrus Hawkes; Johansen, Emil

    2014-12-02

    An apparatus for mounting a photovoltaic (PV) module on a surface, including a support with an upper surface, a lower surface, tabs, one or more openings, and a clip comprising an arm and a notch, where the apparatus resists wind forces and seismic forces and creates a grounding electrical bond between the PV module, support, and clip. The invention further includes a method for installing PV modules on a surface that includes arranging supports in rows along an X axis and in columns along a Y axis on a surface such that in each row the distance between two neighboring supports does not exceed the length of the longest side of a PV module and in each column the distance between two neighboring supports does not exceed the length of the shortest side of a PV module.

  1. City of Mount Hope, Kansas (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    Kansas (Utility Company) Jump to: navigation, search Name: Mount Hope City of Place: Kansas Phone Number: (316) 661-2211 Website: www.mounthopecity.comdefault. Facebook: https:...

  2. Cummins Rocky Mount Engine Plant | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    experience with achieving certification to Superior Energy Performance (SEP(tm)) and ISO 50001. PDF icon Cummins Rocky Mount Engine Plant (September 2015) More Documents & ...

  3. Mount Vernon, New York: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Mount Vernon, New York: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.9125992, -73.8370786 Show Map Loading map... "minzoom":false,"mappin...

  4. Mount Kisco, New York: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    congressional district.12 Registered Energy Companies in Mount Kisco, New York Curtis Instruments Curtis Instruments Inc References US Census Bureau Incorporated place...

  5. Mount Vernon, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Registered Energy Companies in Mount Vernon, Ohio Blight-to-Bright Replex Plastics References US Census Bureau Incorporated place and minor civil division...

  6. Mount Morris, New York: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    district.12 Registered Energy Companies in Mount Morris, New York Energy Enterprises Inc Western NY Energy LLC References US Census Bureau Incorporated place and...

  7. Direct Probe Mounted High-Performance Amplifiers for Pulsed Measuremen...

    Office of Scientific and Technical Information (OSTI)

    Direct Probe Mounted High-Performance Amplifiers for Pulsed Measurement Citation Details ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  8. Direct Probe Mounted High-Performance Amplifiers for Pulsed Measuremen...

    Office of Scientific and Technical Information (OSTI)

    Direct Probe Mounted High-Performance Amplifiers for Pulsed Measurement Citation Details ... Country of Publication: United States Language: English Subject: Materials Science(36) ...

  9. Mount Wachusetts Community College Wind Project | Open Energy...

    Open Energy Info (EERE)

    Community College Energy Purchaser Mount Wachusetts Community College Location Gardner MA Coordinates 42.58855651, -71.98396683 Show Map Loading map......

  10. Portsmouth RI/FS Report for the Site-Wide Waste Disposition Evaluation

    Energy Savers [EERE]

    Project | Department of Energy Site-Wide Waste Disposition Evaluation Project Portsmouth RI/FS Report for the Site-Wide Waste Disposition Evaluation Project This Remedial Investigation and Feasibility Study Report for the Site-Wide Waste Disposition Evaluation Project at the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio, presents the information necessary to select a Site-wide disposal alternative for the waste generated under the Director's Final Findings and Orders (DFF&O) for

  11. A New Path Forward for WTP AL Boldt and RI Smith

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dick Smith and Al Boldt - thoughts to share with the Tank Waste Committee Not a committee work product A New Path Forward for WTP AL Boldt and RI Smith February 3, 2014 Introduction The "Framework" document, issued by the Department of Energy (DOE) in September of 2013, is purported to show the path forward for completion and operation of the Hanford Waste Treatment Plant (WTP) for treatment of Hanford tank wastes. Construction on two principal facilities (HLW and Pretreatment) was

  12. Electro-optic component mounting device

    DOE Patents [OSTI]

    Gruchalla, M.E.

    1994-09-13

    A technique is provided for integrally mounting a device such as an electro-optic device in a transmission line to avoid series resonant effects. A center conductor of the transmission line has an aperture formed therein for receiving the device. The aperture splits the center conductor into two parallel sections on opposite sides of the device. For a waveguide application, the center conductor is surrounded by a conductive ground surface which is spaced apart from the center conductor with a dielectric material. One set of electrodes formed on the surface of the electro-optic device is directly connected to the center conductor and an electrode formed on the surface of the electro-optic device is directly connected to the conductive ground surface. The electrodes formed on the surface of the electro-optic device are formed on curved sections of the surface of the device to mate with correspondingly shaped electrodes on the conductor and ground surface to provide a uniform electric field across the electro-optic device. The center conductor includes a passage formed therein for passage of optical signals to an electro-optic device. 10 figs.

  13. Virtual sine arm kinematic mount system

    SciTech Connect (OSTI)

    Xu, Z.; Randall, K.J.

    1997-09-01

    A novel kinematic mount system for a vertical focusing mirror of the soft x-ray spectroscopy beamline at the Advanced Photon Source is described. The system contains three points in a horizontal plane. Each point consists of two horizontal linear precision stages, a spherical ball bearing, and a vertical precision stage. The horizontal linear stages are aligned orthogonally and are conjoined by a spherical ball bearing, supported by the vertical linear stage at each point. The position of each confined horizontal stage is controlled by a motorized micrometer head by spring-loading the flat tip of the micrometer head onto a tooling ball fixing on the carriage of the stage. A virtual sine arm is formed by tilting the upstream horizontal stage down and the two downstream horizontal stages up by a small angle. The fine pitch motion is achieved by adjusting the upstream stage. This supporting structure is extremely steady due to a relatively large span across the supporting points and yields extremely high resolution on the pitch motion. With a one degree tilt and a microstepping motor, the authors achieved a 0.4 nanoradian resolution on the mirror pitch motion.

  14. Electro-optic component mounting device

    DOE Patents [OSTI]

    Gruchalla, Michael E.

    1994-01-01

    A technique is provided for integrally mounting a device such as an electro-optic device (50) in a transmission line to avoid series resonant effects. A center conductor (52) of the transmission line has an aperture (58) formed therein for receiving the device (50). The aperture (58) splits the center conductor into two parallel sections on opposite sides of the device. For a waveguide application, the center conductor is surrounded by a conductive ground surface (54), which is spaced apart from the center conductor with a dielectric material (56). One set of electrodes formed on the surface of the electro-optic device (50) is directly connected to the center conductor 52 and an electrode formed on the surface of the electro-optic device is directly connected to the conductive ground surface (54). The electrodes formed on the surface of the electro-optic device are formed on curved sections of the surface of the device to mate with correspondingly shaped electrodes on the conductor and ground surface to provide a uniform electric field across the electro-optic device. The center conductor includes a passage ( 60) formed therein for passage of optical signals to an electro-optic device.

  15. Hole-thru-laminate mounting supports for photovoltaic modules

    DOE Patents [OSTI]

    Wexler, Jason; Botkin, Jonathan; Culligan, Matthew; Detrick, Adam

    2015-02-17

    A mounting support for a photovoltaic module is described. The mounting support includes a pedestal having a surface adaptable to receive a flat side of a photovoltaic module laminate. A hole is disposed in the pedestal, the hole adaptable to receive a bolt or a pin used to couple the pedestal to the flat side of the photovoltaic module laminate.

  16. Laser housing having integral mounts and method of manufacturing same

    DOE Patents [OSTI]

    Herron, Michael Alan; Brickeen, Brian Keith

    2004-10-19

    A housing adapted to position, support, and facilitate aligning various components, including an optical path assembly, of a laser. In a preferred embodiment, the housing is constructed from a single piece of material and broadly comprises one or more through-holes; one or more cavities; and one or more integral mounts, wherein the through-holes and the cavities cooperate to define the integral mounts. Securement holes machined into the integral mounts facilitate securing components within the integral mounts using set screws, adhesive, or a combination thereof. In a preferred method of making the housing, the through-holes and cavities are first machined into the single piece of material, with at least some of the remaining material forming the integral mounts.

  17. Improving Memory Subsystem Performance Using ViVA: Virtual Vector Architecture

    SciTech Connect (OSTI)

    Gebis, Joseph; Oliker, Leonid; Shalf, John; Williams, Samuel; Yelick, Katherine

    2009-01-12

    The disparity between microprocessor clock frequencies and memory latency is a primary reason why many demanding applications run well below peak achievable performance. Software controlled scratchpad memories, such as the Cell local store, attempt to ameliorate this discrepancy by enabling precise control over memory movement; however, scratchpad technology confronts the programmer and compiler with an unfamiliar and difficult programming model. In this work, we present the Virtual Vector Architecture (ViVA), which combines the memory semantics of vector computers with a software-controlled scratchpad memory in order to provide a more effective and practical approach to latency hiding. ViVA requires minimal changes to the core design and could thus be easily integrated with conventional processor cores. To validate our approach, we implemented ViVA on the Mambo cycle-accurate full system simulator, which was carefully calibrated to match the performance on our underlying PowerPC Apple G5 architecture. Results show that ViVA is able to deliver significant performance benefits over scalar techniques for a variety of memory access patterns as well as two important memory-bound compact kernels, corner turn and sparse matrix-vector multiplication -- achieving 2x-13x improvement compared the scalar version. Overall, our preliminary ViVA exploration points to a promising approach for improving application performance on leading microprocessors with minimal design and complexity costs, in a power efficient manner.

  18. Methods and apparatus for radially compliant component mounting

    DOE Patents [OSTI]

    Bulman, David Edward (Cincinnati, OH); Darkins, Jr., Toby George (Loveland, OH); Stumpf, James Anthony (Columbus, IN); Schroder, Mark S. (Greenville, SC); Lipinski, John Joseph (Simpsonville, SC)

    2012-03-27

    Methods and apparatus for a mounting assembly for a liner of a gas turbine engine combustor are provided. The combustor includes a combustor liner and a radially outer annular flow sleeve. The mounting assembly includes an inner ring surrounding a radially outer surface of the liner and including a plurality of axially extending fingers. The mounting assembly also includes a radially outer ring coupled to the inner ring through a plurality of spacers that extend radially from a radially outer surface of the inner ring to the outer ring.

  19. 2012 APS-DPP Plasma Science Expo, Providence, RI | Princeton Plasma Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab APS-DPP Plasma Science Expo, Providence, RI View larger image IMG 1847 View larger image IMG 1598 View larger image IMG 1608 View larger image IMG 1609 View larger image IMG 1614 View larger image IMG 1647 View larger image IMG 1650 View larger image IMG 1651 View larger image IMG 1657 View larger image IMG 1659 View larger image IMG 1662 View larger image IMG 1663 View larger image IMG 1664 View larger image IMG 1668 View larger image IMG 1672 View larger image IMG 1675 View larger

  20. Spring Mount, Pennsylvania: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    You can help OpenEI by expanding it. Spring Mount is a census-designated place in Montgomery County, Pennsylvania.1 References US Census Bureau 2005 Place to 2006 CBSA...

  1. Casa de Oro-Mount Helix, California: Energy Resources | Open...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Casa de Oro-Mount Helix is a census-designated place in San Diego County, California.1...

  2. Laboratory Performance Testing of Residential Window Mounted Air

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conditioners | Department of Energy Laboratory Performance Testing of Residential Window Mounted Air Conditioners Laboratory Performance Testing of Residential Window Mounted Air Conditioners This presentation was delivered at the U.S. Department of Energy Building America Technical Update meeting on April 29-30, 2013, in Denver, Colorado. PDF icon testing_residential_ariconditioners_booten_winkler.pdf More Documents & Publications Key Issues High-Efficiency Window Air Conditioners -

  3. RESIDUAL STRESSES IN ADDITIVELY MANUFACTURED INCONEL 718 ENGINE MOUNT

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Conference: RESIDUAL STRESSES IN ADDITIVELY MANUFACTURED INCONEL 718 ENGINE MOUNT Citation Details In-Document Search Title: RESIDUAL STRESSES IN ADDITIVELY MANUFACTURED INCONEL 718 ENGINE MOUNT Authors: Watkins, Thomas R [1] ; Cornwell, Paris A [1] ; Dehoff, Ryan R [1] ; Nangia, Vinod [2] ; Godfrey, Donald G. [2] + Show Author Affiliations ORNL Honeywell Aerospace Services Publication Date: 2015-01-01 OSTI Identifier: 1224750 DOE Contract Number:

  4. Direct Probe Mounted High-Performance Amplifiers for Pulsed Measurement

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Direct Probe Mounted High-Performance Amplifiers for Pulsed Measurement Citation Details In-Document Search Title: Direct Probe Mounted High-Performance Amplifiers for Pulsed Measurement Authors: Wartenbe, Mark [1] ; Stegen, Zachary [1] ; McDonald, Ross David [2] ; Balakirev, Fedor F. [2] + Show Author Affiliations FSU, NHMFL Los Alamos National Laboratory Publication Date: 2014-01-07 OSTI Identifier: 1114404 Report Number(s): LA-UR-14-20074 DOE Contract

  5. Department of Veterans Affairs, FONSI - Ground mounted solar photovoltaic

    Energy Savers [EERE]

    power at San Joaquin National Cemetery | Department of Energy Ground mounted solar photovoltaic power at San Joaquin National Cemetery Department of Veterans Affairs, FONSI - Ground mounted solar photovoltaic power at San Joaquin National Cemetery An Environmental Assessment (EA) has been prepared under the direction of an interdisciplinary team analyzing the proposed construction of a Photovoltaic System at the San Joaquin National Cemetery (SNC) in San Joaquin, Calofornia. PDF icon CX

  6. Energy Secretary Moniz's Remarks at Hampton University in Hampton, Va.-- As Prepared for Delivery

    Broader source: Energy.gov [DOE]

    Today, Secretary of Energy Ernest Moniz traveled to Hampton Roads, Va. to highlight President Obama’s State of the Union address at Hampton University, one of the nation’s top historically black universities and a leader in science, technology, engineering and math (STEM) education.

  7. DOE Spent Nuclear Fuel Information In Support of TSPA-VA

    SciTech Connect (OSTI)

    A. Brewer; D. Cresap; D. Fillmore; H. Loo; M. Ebner; R. McCormack

    1998-09-01

    RW has started the viability assessment (VA) effort to determine the feasibility of Yucca Mountain as the first geologic repository for spent nuclear fuel (SNF) and high-level waste. One component of the viability assessment will be a total system performance assessment (TSPA), based on the design concept and the scientific data and analysis available, describing the repository's probable behavior relative to the overall system performance standards. Thus, all the data collected from the Exploratory Studies Facility to-date have been incorporated into the latest TSPA model. In addition, the Repository Integration Program, an integrated probabilistic simulator, used in the TSPA has also been updated by Golder Associates Incorporated at December 1997. To ensure that the Department of Energy-owned (DOE-owned) SNF continues to be acceptable for disposal in the repository, it will be included in the TSPA-VA evaluation. A number of parameters are needed in the TSPA-VA models to predict the performance of the DOE-owned SNF materials placed into the potential repository. This report documents all of the basis and/or derivation for each of these parameters. A number of properties were not readily available at the time the TSPA-VA data was requested. Thus, expert judgement and opinion was utilized to determine a best property value. The performance of the DOE-owned SNF will be published as part of the TSPA-VA report. Each DOE site will be collecting better data as the DOE SNF program moves closer to repository license application. As required by the RW-0333P, the National Spent Nuclear Fuel Program will be assisting each site in qualifying the information used to support the performance assessment evaluations.

  8. Habdank PV Montagesysteme GmbH Co KG Habdank PV Mounting Systems...

    Open Energy Info (EERE)

    Germany Zip: 73037 Product: Germany-based manufacturer of mounting systems for PV installations. References: Habdank PV-Montagesysteme GmbH & Co KG Habdank PV Mounting...

  9. Piezoelectric resonator assembly with thin molybdenum mounting clips

    DOE Patents [OSTI]

    Peters, R. Donald

    1981-01-01

    A resonator mounting assembly wherein the resonator blank is mounted agai an essentially planar surface presented by a plurality of peripherally disposed mounting clips and bonded to this surface to provide substantially all the mechanical support for the blank in a direction normal to the major faces of the resonator blank, while being flexible in the directions parallel to said major faces so as to minimize radial stresses on the resonator blank, particularly during thermal cycling of the resonator assembly. The clips are fabricated of a low thermal expansion material, such as molybdenum, which also has considerable yield strength after exposure to processing temperatures; the bonding of the clips to the edges of the resonator blank can be achieved by a polyimide containing electrically conductive particles.

  10. NEW BV(RI){sub C} PHOTOMETRY FOR PRAESEPE: FURTHER TESTS OF BROADBAND PHOTOMETRIC CONSISTENCY

    SciTech Connect (OSTI)

    Joner, Michael D.; Taylor, Benjamin J.; Laney, C. David; Van Wyk, Francois

    2011-11-15

    New BV(RI){sub C} measurements of Praesepe made at the South African Astronomical Observatory (SAAO) are presented. When those measurements are combined with those reported in previous papers in this series, it is found that they support previously determined V zero points for Praesepe, M67, and the Hyades. Support is also found for joint (V - R){sub C} and (R - I){sub C} zero points established previously for Praesepe and NGC 752. For the SAAO system of standard stars, a B - V correction to the Johnson system of about -9 mmag appears to be reasonably well established. The preferred (though not definitive) V correction is about +7 mmag. For the Landolt V system, zero-point identity with the Johnson system at a 2{sigma} level of 4.8 mmag is found, and no color term as large as 4 mmag (mag){sup -1} is detected. Updated CDS data files for Praesepe are briefly described.

  11. Rolling contact mounting arrangement for a ceramic combustor

    DOE Patents [OSTI]

    Boyd, Gary L. (328 Sneath Way, Alpine, CA 91901); Shaffer, James E. (1780 Geronimo Tr., Maitland, FL 32751)

    1995-01-01

    A combustor assembly having a preestablished rate of thermal expansion is mounted within a gas turbine engine housing having a preestablished rate of thermal expansion being greater than the preestablished rate of thermal expansion of the combustor assembly. The combustor assembly is constructed of a inlet end portion, a outlet end portion and a plurality of combustor ring segments positioned between the end portions. A mounting assembly is positioned between the combustor assembly and the gas turbine engine housing to allow for the difference in the rate of thermal expansion while maintaining axially compressive force on the combustor assembly to maintain contact between the separate components.

  12. Rolling contact mounting arrangement for a ceramic combustor

    DOE Patents [OSTI]

    Boyd, G.L.; Shaffer, J.E.

    1995-10-17

    A combustor assembly having a preestablished rate of thermal expansion is mounted within a gas turbine engine housing having a preestablished rate of thermal expansion being greater than the preestablished rate of thermal expansion of the combustor assembly. The combustor assembly is constructed of a inlet end portion, a outlet end portion and a plurality of combustor ring segments positioned between the end portions. A mounting assembly is positioned between the combustor assembly and the gas turbine engine housing to allow for the difference in the rate of thermal expansion while maintaining axially compressive force on the combustor assembly to maintain contact between the separate components. 3 figs.

  13. Development of an Urban Resilience Analysis Framework with Application to Norfolk, VA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2161 Unlimited Release Printed March 2016 Development of an Urban Resilience Analysis Framework with Application to Norfolk, VA Robert Jeffers, William Fogleman, Emma Grazier, Sarah Walsh, Sophie Rothman, Calvin Shaneyfelt, Munaf Aamir, Jessica Gibson, Vanessa Vargas, Eric Vugrin, Stephen Conrad, Howard Passell Prepared by Sandia National Laboratories Albuquerque, New Mexico 87185 and Livermore, California 94550 Sandia National Laboratories is a multi-program laboratory managed and operated by

  14. Sabah barge-mounted power plant in service

    SciTech Connect (OSTI)

    Barker, T.

    1995-03-01

    The world`s largest barge-mounted simple-cycle power plant, constructed by the Sabah Shipyards in Malaysia, is now in service in the Philippines. Construction of similar barges from Westinghouse should begin shortly. This paper discusses in brief the projects in progress at present and prospects in the Asian market from the perspective of the manufacturers.

  15. Apparatus for mounting photovoltaic power generating systems on buildings

    DOE Patents [OSTI]

    Russell, Miles C.

    2009-08-18

    Rectangular photovoltaic (PV) modules are mounted on a building roof by mounting stands that are distributed in rows and columns. Each stand comprises a base plate and first and second different height brackets attached to opposite ends of the base plate. Each first and second bracket comprises two module-support members. One end of each module is pivotally attached to and supported by a first module-support member of a first bracket and a second module-support member of another first bracket. At its other end each module rests on but is connected by flexible tethers to module-support members of two different second brackets. The tethers are sized to allow the modules to pivot up away from the module-support members on which they rest to a substantially horizontal position in response to wind uplift forces.

  16. Testing and Development of a 30-kVA Hybrid Inverter: Lessons Learned and Reliability Implications

    SciTech Connect (OSTI)

    Ginn, J.W.

    1998-12-21

    A 30-kVA Trace Technologies hybrid power processor was specified and tested at the Sandia inverter test facility. Trace Technologies involving the control system, in response to suggestions made modifications, primarily by Sandia and Arizona Public Service (APS) personnel. The modifications should make the inverter more universally applicable and less site-specific so that it can be applied in various sites with minimal field interaction required from the design engineer. The project emphasized the importance of battery management, generator selection, and site load management to the performance and reliability of hybrid power systems.

  17. Test probe for surface mounted leadless chip carrier

    DOE Patents [OSTI]

    Meyer, Kerry L.; Topolewski, John

    1989-05-23

    A test probe for a surface mounted leadless chip carrier is disclosed. The probed includes specially designed connector pins which allow size reductions in the probe. A thermoplastic housing provides spring action to ensure good mechanical and electrical contact between the pins and the contact strips of a leadless chip carrier. Other features include flexible wires molded into the housing and two different types of pins alternately placed in the housing. These features allow fabrication of a smaller and simpler test probe.

  18. Electrical wiring box with structure for fast device mounting

    DOE Patents [OSTI]

    Johnston, Earl S.

    1991-01-08

    An electrical wiring box of molded insulating material is provided with bosses having screw holes for receiving a mounting screw that include two colinear portions of which a first portion proximate the front surface has an internal configuration, such as molded threads, that engage the mounting screw while permitting the mounting screw to be manually inserted therethrough without turning because of flexibility built into the boss structure. A second portion of the screw hole is of greater restriction for securely engaging the screw such as by self tapping. The flexibility of the boss is provided by a first center slot that extends from the screw hole to the boss exterior over a length substantially equal to the first portion of the screw hole. Second and third slots are located respectively on each side of the screw hole and provide projections respectively between the first and second slots and the first and third slots that flex to allow easy screw insertion through the first portion of the screw hole.

  19. V-227: VMware Workstation and Player vmware-mount Command Flaw...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workstation and Player vmware-mount Command Flaw Lets Local Users Gain Root Privileges V-227: VMware Workstation and Player vmware-mount Command Flaw Lets Local Users Gain Root...

  20. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project...

    Energy Savers [EERE]

    Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility ...

  1. Enhanced T-lymphocyte blastogenic response to tuberculin (PPD) in children of northeast (NE) Thailand supplemented with vitamin A (VA) and zinc (Zn)

    SciTech Connect (OSTI)

    Kramer, T.R.; Udomkesmalee, E.; Dhanamitta, S.; Sirisinha, S.; Charoenkiatkul, S.; Tantipopipat, S.; Banjong, O.; Rojroongwasinkul, N.; Smith, J.C. Jr. Mahidol Univ., Nakhon Pathom )

    1991-03-15

    Beneficial effects of Va and/or Zn supplementation of children in NE Thailand are described in a companion abstract. In the same study, blastogenic response (BR) of T-lymphocytes to concanavalin-A (ConA) and PPD were assayed in cultures containing mononuclear cells (MNC) or whole blood (WB). Methods were previously described. Children were previously vaccinated with BCG. BR to ConA of MNC or WB from children supplemented with VA, Zn, VA + Zn or placebo were similar. BR to PPD of MNC was higher in children receiving VA + Zn than placebo, but not in children supplemented with VA or Zn alone. Data indicate that children with suboptimal VA and Zn nutriture supplemented with < 2 times RDA of these nutrients showed enhanced cellular immunity to PPD. This observation is relevant to BCG immunization program and thus may benefit public health.

  2. The Cummins Rocky Mount Engine Plant Case Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance » Superior Energy Performance » The Cummins Rocky Mount Engine Plant Case Study The Cummins Rocky Mount Engine Plant Case Study sep_logo_borderless.jpg The Cummins Rocky Mount Engine Plant (RMEP) in Rocky Mount, North Carolina is saving over $700,000 annually and achieved a 12.6% energy performance improvement after implementing SEP. (July 2015) PDF icon Cummins' Case Study for Superior Energy Performance More Documents & Publications SEP Case Study Webinar: Cummins

  3. Thermoelectric generator having a resiliently mounted removable thermoelectric module

    DOE Patents [OSTI]

    Purdy, David L.; Shapiro, Zalman M.; Hursen, Thomas F.; Maurer, Gerould W.

    1976-11-02

    An electrical generator having an Isotopic Heat Capsule including radioactive fuel rod 21 as a primary heat source and Thermoelectric Modules 41 and 43 as converters. The Biological Shield for the Capsule is suspended from Spiders at each end each consisting of pretensioned rods 237 and 239 defining planes at right angles to each other. The Modules are mounted in cups 171 of transition members 173 of a heat rejection Fin Assembly whose fins 195 and 197 extend from both sides of the transition member 173 for effective cooling.

  4. Test probe for surface mounted leadless chip carrier

    DOE Patents [OSTI]

    Meyer, K.L.; Topolewski, J.

    1987-10-02

    A test probe for a surface mounted leadless chip carrier is disclosed. The probe includes specially designed connector pins which allow size reductions in the probe. A thermoplastic housing provides spring action to ensure good mechanical and electrical contact between the pins and the contact strips of a leadless chip carrier. Other features include flexible wires molded into the housing and two different types of pins alternately placed in the housing. These features allow fabrication of a smaller and simpler test probe. 1 fig.

  5. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for Department of Veterans Affairs – VA Manhattan Campus

    SciTech Connect (OSTI)

    Stephen Schey; Jim Francfort

    2014-10-01

    This report focuses on the Department of Veterans Affairs, VA Manhattan Campus (VA- Manhattan) fleet to identify the daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support successful introduction of plug-in electric vehicles (PEVs) into the agency’s fleet. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively called PEVs) can fulfill the mission requirements.

  6. System and method for reproducibly mounting an optical element

    DOE Patents [OSTI]

    Eisenbies, Stephen; Haney, Steven

    2005-05-31

    The present invention provides a two-piece apparatus for holding and aligning the MEMS deformable mirror. The two-piece apparatus comprises a holding plate for fixedly holding an adaptive optics element in an overall optical system and a base spatially fixed with respect to the optical system and adapted for mounting and containing the holding plate. The invention further relates to a means for configuring the holding plate through adjustments to each of a number of off-set pads touching each of three orthogonal plane surfaces on the base, wherein through the adjustments the orientation of the holding plate, and the adaptive optics element attached thereto, can be aligned with respect to the optical system with six degrees of freedom when aligning the plane surface of the optical element. The mounting system thus described also enables an operator to repeatedly remove and restore the adaptive element in the optical system without the need to realign the system once that element has been aligned.

  7. Sensor 17 Thermal Isolation Mounting Structure (TIMS) Design Improvements

    SciTech Connect (OSTI)

    Enstrom, K.

    2015-09-04

    The SENSOR 17 thermographic camera weighs approximately 0.5lbs, has a fundamental mode of 167 Hz, and experiences 0.75W of heat leakage in through the TIMS. The configuration, shown in Figure 1, is comprised of four 300 Series SST washers paired in tandem with P.E.I (Ultem 100) washers. The SENSOR 17 sensor is mounted to a 300 series stainless plate with A-shaped arms. The Plate can be assumed to be at ambient temperatures (≈293K) and the I.R. Mount needs to be cooled to 45K. It is attached to the tip of a cryocooler by a ‘cold strap’ and is assumed to be at the temperature of the cold-strap (≈45K). During flights SENSOR 17 experiences excitations at frequencies centered around 10-30Hz, 60Hz, and 120Hz from the aircraft flight environment. The temporal progression described below depicts the 1st Modal shape at the systems resonant frequency. This simulation indicates Modal articulation will cause a pitch rate of the camera with respect to the body axis of the airplane. This articulation shows up as flutter in the camera.

  8. If you reside in WASHINGTON, DC - MD -VA- WV your salary will range from:

    National Nuclear Security Administration (NNSA)

    If you are employed in the WASHINGTON, DC Metropolitan Area (D.C., Baltimore, Northern VA, Eastern WV, and Southern PA) your salary will range from: Pay Band Pay Plan(s) Minimum Maximum Developmental EN $49,246 $74,872 01 EK/EJ $34,075 $58,511 02 EK/EJ $51,630 $84,855 03 EK/EJ/EN $74,872 $119,238 04 EK/EJ/EN $105,211 $165,300 05 EK/EJ/EN $148,510 $165,300 If you are employed in OAKLAND/LIVERMORE, CA your salary will range from: Pay Band Pay Plan(s) Minimum Maximum Developmental EN $53,579

  9. Low-energy RI beam technology and nuclear clusters in the explosive pp-chain breakout process

    SciTech Connect (OSTI)

    Kubono, S. [Institute of Modern Physics, Chinese Academy of Sciences, Nanchang Road 509, Lanzhou 73000 (China); RIKEN Nishina Center, 2-1 Hirosawa, Wako, Saitama 351-0198 (Japan); Center for Nuclear Study, University of Tokyo, 2-1 Hirosawa, Wako, Saitama 351-0 (Japan); Yamaguchi, H.; Kahl, D. M.; Ohshiro, Y.; Watanabe, S.; Yamazaki, N. [Center for Nuclear Study, University of Tokyo, 2-1 Hirosawa, Wako, Saitama 351-0198 (Japan); Teranishi, T. [Department of Physics, Kyushu University, 6-10-1 Hakozaki, Fukuoka 812-858 (Japan); Yanagisawa, Y.; Wakabayashi, Y.; Kase, M. [RIKEN Nishina Center, 2-1 Hirosawa, Wako, Saitama 351-0198 (Japan); Hayakawa, S. [Laboratori Nazionali del Sud, Istituto Nazionale di Fisica Nucleare, Via S. Sofia 62, 95125 Catania (Italy); Kwon, Y. K. [Institute for Basic Science, 70, Yuseong-daero 1689-gil, Yuseong-gu, Daejeon 305-81 (Korea, Republic of); Hashimoto, T.; Fukuda, Y. [Research Center for Nuclear Physics, Osaka University, 10-1 Mihogaoka, Ibaraki, Osaka 567-0047 (Japan); He, J. J. [Institute of Modern Physics, Chinese Academy of Sciences, Nanchang Road 509, Lanzhou 73000 (China); Goto, A. [Faculty of Medcine, Yamagata University, Yamagata 990-2331 (Japan); Muto, H. [Center of General Education, Tokyo University of Science at Suwa, Chino, Nagano 391-0292 (Japan)

    2014-05-09

    The lecture includes two parts: One is a discussion on the technology for developing RIB beam facility based on the in-flight method and relevant experimental technology. The second part is a discussion on experimental efforts for studying the breakout process from the pp-chain region based on recent works with low energy RI beams. The discussion of the second part specifically covers the problem of the vp-process in type II supernovae in terms of alpha cluster nature for the reactions.

  10. Regenerative braking device with rotationally mounted energy storage means

    DOE Patents [OSTI]

    Hoppie, Lyle O.

    1982-03-16

    A regenerative braking device for an automotive vehicle includes an energy storage assembly (12) having a plurality of rubber rollers (26, 28) mounted for rotation between an input shaft (30) and an output shaft (32), clutches (50, 56) and brakes (52, 58) associated with each shaft, and a continuously variable transmission (22) connectable to a vehicle drivetrain and to the input and output shafts by the respective clutches. In a second embodiment the clutches and brakes are dispensed with and the variable ratio transmission is connected directly across the input and output shafts. In both embodiments the rubber rollers are torsionally stressed to accumulate energy from the vehicle when the input shaft rotates faster or relative to the output shaft and are torsionally relaxed to deliver energy to the vehicle when the output shaft rotates faster or relative to the input shaft.

  11. Adapter plate assembly for adjustable mounting of objects

    DOE Patents [OSTI]

    Blackburn, Robert S.

    1987-01-01

    An adapter plate and two locking discs are together affixed to an optic table with machine screws or bolts threaded into a fixed array of internally threaded holes provided in the table surface. The adapter plate preferably has two, and preferably parallel, elongated locating slots each freely receiving a portion of one of the locking discs for secure affixation of the adapter plate to the optic table. A plurality of threaded apertures provided in the adapter plate are available to attach optical mounts or other devices onto the adapter plate in an orientation not limited by the disposition of the array of threaded holes in the table surface. An axially aligned but radially offset hole through each locking disc receives a screw that tightens onto the table, such that prior to tightening of the screw the locking disc may rotate and translate within each locating slot of the adapter plate for maximum flexibility of the orientation thereof.

  12. Direct mounted photovoltaic device with improved adhesion and method thereof

    DOE Patents [OSTI]

    Boven, Michelle L; Keenihan, James R; Lickly, Stan; Brown, Jr., Claude; Cleereman, Robert J; Plum, Timothy C

    2014-12-23

    The present invention is premised upon a photovoltaic device suitable for directly mounting on a structure. The device includes an active portion including a photovoltaic cell assembly having a top surface portion that allows transmission of light energy to a photoactive portion of the photovoltaic device for conversion into electrical energy and a bottom surface having a bottom bonding zone; and an inactive portion immediately adjacent to and connected to the active portion, the inactive portion having a region for receiving a fastener to connect the device to the structure and having on a top surface, a top bonding zone; wherein one of the top and bottom bonding zones comprises a first bonding element and the other comprises a second bonding element, the second bonding element designed to interact with the first bonding element on a vertically overlapped adjacent photovoltaic device to bond the device to such adjacent device or to the structure.

  13. Adapter plate assembly for adjustable mounting of objects

    DOE Patents [OSTI]

    Blackburn, R.S.

    1986-05-02

    An adapter plate and two locking discs are together affixed to an optic table with machine screws or bolts threaded into a fixed array of internally threaded holes provided in the table surface. The adapter plate preferably has two, and preferably parallel, elongated locating slots each freely receiving a portion of one of the locking discs for secure affixation of the adapter plate to the optic table. A plurality of threaded apertures provided in the adapter plate are available to attach optical mounts or other devices onto the adapter plate in an orientation not limited by the disposition of the array of threaded holes in the table surface. An axially aligned but radially offset hole through each locking disc receives a screw that tightens onto the table, such that prior to tightening of the screw the locking disc may rotate and translate within each locating slot of the adapter plate for maximum flexibility of the orientation thereof.

  14. Flush-mounted probe diagnostics for argon glow discharge plasma

    SciTech Connect (OSTI)

    Xu, Liang Cao, Jinxiang; Liu, Yu; Wang, Jian; Du, Yinchang; Zheng, Zhe; Zhang, Xiao; Wang, Pi; Zhang, Jin; Li, Xiao; Qin, Yongqiang; Zhao, Liang

    2014-09-15

    A comparison is made between plasma parameters measured by a flush-mounted probe (FP) and a cylindrical probe (CP) in argon glow discharge plasma. Parameters compared include the space potential, the plasma density, and the effective electron temperature. It is found that the ion density determined by the FP agrees well with the electron density determined by the CP in the quasi-neutral plasma to better than 10%. Moreover, the space potential and effective electron temperature calculated from electron energy distribution function measured by the FP is consistent with that measured by the CP over the operated discharge current and pressure ranges. These results present the FP can be used as a reliable diagnostic tool in the stable laboratory plasma and also be anticipated to be applied in other complicated plasmas, such as tokamaks, the region of boundary-layer, and so on.

  15. Yieldably mounted lubricant control assemblies for piston rods

    SciTech Connect (OSTI)

    Meijer, R.J.; Ziph, B. Godett, T.M.

    1986-04-01

    This patent describes an engine having a housing comprising a cylinder within which a piston reciprocates and a piston rod extending from the piston through a bore which extends in the housing from the cylinder to a crankcase and a lubricant control assembly which is disposed within the bore in cooperative arrangement with the piston rod and functions to separate the cylinder from the crankcase while allowing the piston rod to reciprocate axially through a lubricant control portion of the lubricant control assembly which is in forceful contact around the piston rod, the improvement which comprises a compliant housing for mounting the lubricant control assembly on the engine housing. The compliant housing is operatively disposed between the engine housing and the lubricant control portion to allow the lubricant control portion to be radially displaced with respect to the bore and thereby comply with radial displacement of the reciprocating piston rod while maintaining substantially full effectiveness of the lubricant control portion acting on the piston rod. The lubricant control assembly consists of a tubular part, means attaching the tubular part to the compliant housing such that the tubular part can comply with radial displacement of the reciprocating piston rod, and force-applying means acting between the tubular part and the lubricant control portion for urging the lubricant control portion into forceful contact around the reciprocating piston rod.

  16. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for Department of Veterans Affairs. James J. Peters VA Medical Center, Bronx, NY

    SciTech Connect (OSTI)

    Schey, Stephen; Francfort, Jim

    2014-10-01

    This report focuses on the Department of Veterans Affairs, James J. Peters VA Medical Center (VA - Bronx) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  17. Integrated crystal mounting and alignment system for high-throughput biological crystallography

    DOE Patents [OSTI]

    Nordmeyer, Robert A.; Snell, Gyorgy P.; Cornell, Earl W.; Kolbe, William; Yegian, Derek; Earnest, Thomas N.; Jaklevic, Joseph M.; Cork, Carl W.; Santarsiero, Bernard D.; Stevens, Raymond C.

    2005-07-19

    A method and apparatus for the transportation, remote and unattended mounting, and visual alignment and monitoring of protein crystals for synchrotron generated x-ray diffraction analysis. The protein samples are maintained at liquid nitrogen temperatures at all times: during shipment, before mounting, mounting, alignment, data acquisition and following removal. The samples must additionally be stably aligned to within a few microns at a point in space. The ability to accurately perform these tasks remotely and automatically leads to a significant increase in sample throughput and reliability for high-volume protein characterization efforts. Since the protein samples are placed in a shipping-compatible layered stack of sample cassettes each holding many samples, a large number of samples can be shipped in a single cryogenic shipping container.

  18. Integrated crystal mounting and alignment system for high-throughput biological crystallography

    DOE Patents [OSTI]

    Nordmeyer, Robert A.; Snell, Gyorgy P.; Cornell, Earl W.; Kolbe, William F.; Yegian, Derek T.; Earnest, Thomas N.; Jaklevich, Joseph M.; Cork, Carl W.; Santarsiero, Bernard D.; Stevens, Raymond C.

    2007-09-25

    A method and apparatus for the transportation, remote and unattended mounting, and visual alignment and monitoring of protein crystals for synchrotron generated x-ray diffraction analysis. The protein samples are maintained at liquid nitrogen temperatures at all times: during shipment, before mounting, mounting, alignment, data acquisition and following removal. The samples must additionally be stably aligned to within a few microns at a point in space. The ability to accurately perform these tasks remotely and automatically leads to a significant increase in sample throughput and reliability for high-volume protein characterization efforts. Since the protein samples are placed in a shipping-compatible layered stack of sample cassettes each holding many samples, a large number of samples can be shipped in a single cryogenic shipping container.

  19. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping

    Energy Savers [EERE]

    and Feasibility | Department of Energy Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility This Sandia National Laboratories study examines the feasibility of a hydrogen-fueled PEM fuel cell barge to provide electrical power to vessels at anchorage or at berth. The study includes both a determination of the technical feasibility of the idea as well as an analysis of

  20. Test plan/procedure for the shock limiting device of the radioisotope thermoelectric generator package mounting subsystem 145. Revision 1

    SciTech Connect (OSTI)

    Satoh, J.A.

    1995-05-25

    This document defines the procedure to be used in the 18 inch drop test to be used for design verification of the RTG Transportation System Package Mounting.

  1. U.S. Department of Energy Hydrogen and Fuel Cells Program 2012 Annual Merit Review and Peer Evaluation Report: May 14-18, 2012, Arlington, VA

    SciTech Connect (OSTI)

    Not Available

    2012-09-01

    This document summarizes the comments provided by peer reviewers on hydrogen and fuel cell projects presented at the fiscal year (FY) 2012 U.S. Department of Energy (DOE) Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting (AMR), held May 14-18, 2012, in Arlington, VA.

  2. Method of making cascaded die mountings with springs-loaded contact-bond options

    DOE Patents [OSTI]

    Hsu, John S.; Adams, Donald J.; Su, Gui-Jia; Marlino, Laura D.; Ayers, Curtis W.; Coomer, Chester

    2007-06-19

    A cascaded die mounting device and method using spring contacts for die attachment, with or without metallic bonds between the contacts and the dies, is disclosed. One embodiment is for the direct refrigerant cooling of an inverter/converter carrying higher power levels than most of the low power circuits previously taught, and does not require using a heat sink.

  3. Cascaded die mountings with spring-loaded contact-bond options

    DOE Patents [OSTI]

    Hsu, John S.; Adams, Donald J.; Su, Gui-Jia; Marlino, Laura D.; Ayers, Curtis W.; Coomer, Chester

    2005-08-16

    A cascaded die mounting device and method using spring contacts for die attachment, with or without metallic bonds between the contacts and the dies, is disclosed. One embodiment is for the direct refrigerant cooling of an inverter/converter carrying higher power levels than most of the low power circuits previously taught, and does not require using a heat sink.

  4. Apparatus and method for mounting photovoltaic power generating systems on buildings

    DOE Patents [OSTI]

    Russell, Miles Clayton

    2008-10-14

    Rectangular PV modules (6) are mounted on a building roof (4) by mounting stands that are distributed in rows and columns. Each stand comprises a base plate (10) that rests on the building roof (4) and first and second brackets (12, 14) of different height attached to opposite ends of the base plate (10). Each bracket (12, 14) has dual members for supporting two different PV modules (6), and each PV module (6) has a mounting pin (84) adjacent to each of its four corners. Each module (6) is supported by attachment of two of its mounting pins (84) to different first brackets (12), whereby the modules (6) and their supporting stands are able to resist uplift forces resulting from high velocity winds without the base plates (10) being physically attached to the supporting roof structure (4). Preferably the second brackets (14) have a telescoping construction that permits their effective height to vary from less than to substantially the same as that of the first brackets (12).

  5. DOE Partnership Completes Successful CO2 Injection Test in the Mount Simon Sandstone

    Broader source: Energy.gov [DOE]

    The Midwest Regional Carbon Sequestration Partnership, one of seven partnerships in the U.S. Department of Energy's Regional Carbon Sequestration Partnerships program, has successfully injected 1,000 metric tons of carbon dioxide (CO2) into the Mount Simon Sandstone, a deep saline formation that is widespread across much of the Midwest.

  6. Mounting arrangement for the drive system of an air-bearing spindle on a machine tool

    DOE Patents [OSTI]

    Lunsford, J.S.; Crisp, D.W.; Petrowski, P.L.

    1987-12-07

    The present invention is directed to a mounting arrangement for the drive system of an air-bearing spindle utilized on a machine tool such as a lathe. The mounting arrangement of the present invention comprises a housing which is secured to the casing of the air bearing in such a manner that the housing position can be selectively adjusted to provide alignment of the air-bearing drive shaft supported by the housing and the air-bearing spindle. Once this alignment is achieved the air between spindle and the drive arrangement is maintained in permanent alignment so as to overcome misalignment problems encountered in the operation of the machine tool between the air-bearing spindle and the shaft utilized for driving the air-bearing spindle.

  7. Carbonyl sulfide and carbon disulfide from the eruptions of Mount St. Helens

    SciTech Connect (OSTI)

    Rasmussen, R.A.; Khalil, M.A.K.; Dalluge, R.W.; Penkett, S.A.; Jones, B.

    1982-01-01

    Ash from the massive 18 May 1980 eruption of Mount St. Helens readily gave off large amounts of carbonyl sulfide and carbon disulfide gases at room temperature. These findings suggest that the sulfur that enhances the Junge sulfate layer in the stratosphere after volcanic eruptions could be carried directly to the upper atmosphere as carbonyl sulfide and carbon disulfide adsorbed on ash particles from major volcanic eruptions.

  8. Risk-Informed Monitoring, Verification and Accounting (RI-MVA). An NRAP White Paper Documenting Methods and a Demonstration Model for Risk-Informed MVA System Design and Operations in Geologic Carbon Sequestration

    SciTech Connect (OSTI)

    Unwin, Stephen D.; Sadovsky, Artyom; Sullivan, E. C.; Anderson, Richard M.

    2011-09-30

    This white paper accompanies a demonstration model that implements methods for the risk-informed design of monitoring, verification and accounting (RI-MVA) systems in geologic carbon sequestration projects. The intent is that this model will ultimately be integrated with, or interfaced with, the National Risk Assessment Partnership (NRAP) integrated assessment model (IAM). The RI-MVA methods described here apply optimization techniques in the analytical environment of NRAP risk profiles to allow systematic identification and comparison of the risk and cost attributes of MVA design options.

  9. Base excitation testing system using spring elements to pivotally mount wind turbine blades

    DOE Patents [OSTI]

    Cotrell, Jason; Hughes, Scott; Butterfield, Sandy; Lambert, Scott

    2013-12-10

    A system (1100) for fatigue testing wind turbine blades (1102) through forced or resonant excitation of the base (1104) of a blade (1102). The system (1100) includes a test stand (1112) and a restoring spring assembly (1120) mounted on the test stand (1112). The restoring spring assembly (1120) includes a primary spring element (1124) that extends outward from the test stand (1112) to a blade mounting plate (1130) configured to receive a base (1104) of blade (1102). During fatigue testing, a supported base (1104) of a blad (1102) may be pivotally mounted to the test stand (1112) via the restoring spring assembly (1120). The system (1100) may include an excitation input assembly (1140) that is interconnected with the blade mouting plate (1130) to selectively apply flapwise, edgewise, and/or pitch excitation forces. The restoring spring assemply (1120) may include at least one tuning spring member (1127) positioned adjacent to the primary spring element (1124) used to tune the spring constant or stiffness of the primary spring element (1124) in one of the excitation directions.

  10. ZERH Training: Harrisonburg, VA

    Broader source: Energy.gov [DOE]

    This 3.5-hour training provides builders with a comprehensive review of zero energy-ready home construction including the business case, detailed specifications, and opportunities to be recognized...

  11. Mo#va#on

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    = a n i nherent l imita#ons of both: h ot & c old f usion r eac#ons: Hot (well--- d eformed r adioac1ve ac1nides ( Act.) t argets a re u sed a nd compound n ucleus i s q uite e xcited ) * a8empts o f g oing b eyond the r eac#ons A ct. + 48 Ca b y using h eavier p rojec#les l ike 50 Ti, 54 Cr, 58 Fe, a nd 64 Ni gave n o r esults s o f ar. * all h eavier a c#nides w ith Z>98 l ive t o s hort t hat o ne could p erform t arget w ith them. Cold ( magic n uclei a s t argets a re u sed w ith

  12. Advanced Battery Manufacturing (VA)

    SciTech Connect (OSTI)

    Stratton, Jeremy

    2012-09-30

    LiFeBATT has concentrated its recent testing and evaluation on the safety of its batteries. There appears to be a good margin of safety with respect to overheating of the cells and the cases being utilized for the batteries are specifically designed to dissipate any heat built up during charging. This aspect of LiFeBATTs products will be even more fully investigated, and assuming ongoing positive results, it will become a major component of marketing efforts for the batteries. LiFeBATT has continued to receive prismatic 20 Amp hour cells from Taiwan. Further testing continues to indicate significant advantages over the previously available 15 Ah cells. Battery packs are being assembled with battery management systems in the Danville facility. Comprehensive tests are underway at Sandia National Laboratory to provide further documentation of the advantages of these 20 Ah cells. The company is pursuing its work with Hybrid Vehicles of Danville to critically evaluate the 20 Ah cells in a hybrid, armored vehicle being developed for military and security applications. Results have been even more encouraging than they were initially. LiFeBATT is expanding its work with several OEM customers to build a worldwide distribution network. These customers include a major automotive consulting group in the U.K., an Australian maker of luxury off-road campers, and a number of makers of E-bikes and scooters. LiFeBATT continues to explore the possibility of working with nations that are woefully short of infrastructure. Negotiations are underway with Siemens to jointly develop a system for using photovoltaic generation and battery storage to supply electricity to communities that are not currently served adequately. The IDA has continued to monitor the progress of LiFeBATTs work to ensure that all funds are being expended wisely and that matching funds will be generated as promised. The company has also remained current on all obligations for repayment of an IDA loan and lease payments for space to the IDA. A commercial venture is being formed to utilize the LiFeBATT product for consumer use in enabling photovoltaic powered boat lifts. Field tests of the system have proven to be very effective and commercially promising. This venture is expected to result in significant sales within the next six months.

  13. Arlington, VA 22209 USA

    Energy Savers [EERE]

    Arkansas Recovery Act State Memo Arkansas Recovery Act State Memo Arkansas has substantial natural resources, including gas, oil, wind, biomass, and hydroelectric power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in Arkansas are supporting a broad range of clean energy projects, from energy efficiency and the smart grid to advanced battery manufacturing and renewable energy.

  14. Evaluation of radon progeny from Mount St. Helens eruptions. Final report

    SciTech Connect (OSTI)

    Lepel, E.A.; Olsen, K.B.; Thomas, V.W.; Eichner, F.N.

    1982-09-01

    A network of twelve monitoring sites around Mount St. Helens was established to evaluate possible short-lived radioactivity in the fallen ash. Seven sites were located near major population centers of Washington and Oregon, and five sites were located within 80 km of the volcano. Each site monitored the radioactivity present by the use of thermoluminescent dosimeters which recorded the total exposure to radioactivity over the exposure period. Eruptions occurring on July 22, August 7, and October 16 to 18, 1980 were monitored. No statistically significant quantities of measurable radon daughters were observed.

  15. Eddy current probe with foil sensor mounted on flexible probe tip and method of use

    DOE Patents [OSTI]

    Viertl, John R. M.; Lee, Martin K.

    2001-01-01

    A pair of copper coils are embedded in the foil strip. A first coil of the pair generates an electromagnetic field that induces eddy currents on the surface, and the second coil carries a current influenced by the eddy currents on the surface. The currents in the second coil are analyzed to obtain information on the surface eddy currents. An eddy current probe has a metal housing having a tip that is covered by a flexible conductive foil strip. The foil strip is mounted on a deformable nose at the probe tip so that the strip and coils will conform to the surface to which they are applied.

  16. Passive pavement-mounted acoustical linguistic drive alert system and method

    DOE Patents [OSTI]

    Kisner, Roger A.; Anderson, Richard L.; Carnal, Charles L.; Hylton, James O.; Stevens, Samuel S.

    2001-01-01

    Systems and methods are described for passive pavement-mounted acoustical alert of the occupants of a vehicle. A method of notifying a vehicle occupant includes providing a driving medium upon which a vehicle is to be driven; and texturing a portion of the driving medium such that the textured portion interacts with the vehicle to produce audible signals, the textured portion pattern such that a linguistic message is encoded into the audible signals. The systems and methods provide advantages because information can be conveyed to the occupants of the vehicle based on the location of the vehicle relative to the textured surface.

  17. Work plan for the fabrication of the radioisotope thermoelectric generator transportation system package mounting

    SciTech Connect (OSTI)

    Satoh, J.A.

    1994-11-09

    The Radioisotope Thermoelectric Generator (RTG) has available a dedicated system for the transportation of RTG payloads. The RTG Transportation System (System 100) is comprised of four systems; the Package (System 120), the Semi-trailer (System 140), the Gas Management (System 160), and the Facility Transport (System 180). This document provides guidelines on the fabrication, technical requirements, and quality assurance of the Package Mounting (Subsystem 145), part of System 140. The description follows the Development Control Requirements of WHC-CM-6-1, EP 2.4, Rev. 3.

  18. Ground-Based and Airborne (PMS 2-D Probe Canister-Mounted) 183 GHz Water

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vapor Radiometer Ground-Based and Airborne (PMS 2-D Probe Canister-Mounted) 183 GHz Water Vapor Radiometer Pazmany, Andrew ProSensing Inc. Category: Instruments ProSensing Inc. has developed a G-band (183 GHz, 1.5 mm wavelength) water vapor radiometer (GVR) for the measurement of low concentrations of atmospheric water vapor and liquid water. The instrument's precipitable water vapor measurement precision is approximately 0.01 mm in dry (<2 mm vapor column) conditions. The ground-based

  19. Design of precision mounts for optimizing the conversion efficiency of KDP crystals for the National Ignition Facility

    SciTech Connect (OSTI)

    Hibbard, R.L., LLNL

    1998-03-30

    A key design challenge for the National Ignition Facility (NIF), being constructed at Lawrence Livermore National Laboratory (LLNL), [Hibbard, R L , 1998], is the frequency converter consisting of two KDP crystals and a focusing lens Frequency conversion is a critical performance factor for NIF and the optical mount design for this plays a key role in meeting design specifications The frequency converter is a monolithic cell that mounts the optics and is the point on the beamline where the frequency conversion crystals are optimally aligned and the cell is focused on target The lasing medium is neodymium in phosphate glass with a fundamental frequency (1{omega}) of 1 053 {micro}m Sum frequency generation in a pair of conversion crystals (KDP/KD*P) produces 1 8 MJ of the third harmonic light (3{omega} or {lambda}=O 35 pm). The phase-matching scheme on NIF is type I second harmonic generation followed by type II sum-frequency-mixing of the residual fundamental and the second harmonic light This laser unlike previous laser system designs, must achieve high conversion efficiency, 85%, which is close to the 90 8% theoretical maximum As a result, this design is very sensitive to angular variations in beam propagation and in the crystal axes orientation. Factors that influence the phase matching angle include crystal inhomogeneity, residual and induced stress in the crystals, the crystals` natural and mounted surface figure, mounting imperfections and gravity sag These angular variations need to be controlled within a 40 {micro}rad error budget. The optical mount contributions to the angular error budget are 20 {micro}rad and are what make the frequency converter in the Final Optics Cell (FOC) such a challenging precision design. The premise of using full edge support in the FOC design is primarily driven by the spherical target chamber design that has optics mounted at multiple longitudinal angles and thus gravity sag in the crystals that needs to be minimized To meet the angular performance requirements, a precision monolithic cell with full edge support for mounting the optics to 10 {micro}rad angular and 1-5 {micro}m flatness tolerances is required The NIF frequency converter design is a major step in improving both conversion efficiency and precision of the mount design Another major consideration in the FOC design is the trade-off between cost of manufacturing the cell and the performance of the mount An interesting balance of what can be accomplished with a conventional machine tool in a commercial shop to produce prototype FOC` s will be discussed Metrology issues involved in qualifying the FOC are also discussed.

  20. Pyrometer mount for a closed-circuit thermal medium cooled gas turbine

    DOE Patents [OSTI]

    Jones, Raymond Joseph; Kirkpatrick, Francis Lawrence; Burns, James Lee; Fulton, John Robert

    2002-01-01

    A steam-cooled second-stage nozzle segment has an outer band and an outer cover defining a plenum therebetween for receiving cooling steam for flow through the nozzles to the inner band and cover therefor and return flow through the nozzles. To measure the temperature of the buckets of the stage forwardly of the nozzle stage, a pyrometer boss is electron beam-welded in an opening through the outer band and TIG-welded to the outer cover plate. By machining a hole through the boss and seating a linearly extending tube in the boss, a line of sight between a pyrometer mounted on the turbine frame and the buckets is provided whereby the temperature of the buckets can be ascertained. The welding of the boss to the outer band and outer cover enables steam flow through the plenum without leakage, while providing a line of sight through the outer cover and outer band to measure bucket temperature.

  1. Magmatic model for the Mount St. Helens blast of May 18, 1980

    SciTech Connect (OSTI)

    Eichelberger, J.C.; Hayes, D.B.

    1982-09-10

    Analytical and numerical solutions to the hydrodynamic equations of motion, constrained by physical properties of juvenile ejecta in the Mount St. Helens blast deposit, were used to investigate magmatic conditions required to produce the initial devastating blast phase of the eruption of May 18, 1980. Evidence that the blast was magmatic includes equivalence in volume of juvenile blast ejecta to preeruption inflation of the cone, substantial vesicularity of this ejecta, and continued vesiculation of large juvenile clasts after eruption. Observed or inferred ejecta velocities of 100 to 250 m/s are shown to require 0.2 to 0.7 wt% water vapor preexisting in magma unloaded by a landslide 200 to 900 m thick. These conditions imply total magmatic water contents of 0.7 to 1.7 wt%, respectively. Such low required water content suggests that volcanic blasts may be regarded as a normal consequence of magma intrusion into an unstable edifice.

  2. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility.

    SciTech Connect (OSTI)

    Pratt, Joseph William; Harris, Aaron P

    2013-01-01

    A barge-mounted hydrogen-fueled proton exchange membrane (PEM) fuel cell system has the potential to reduce emissions and fossil fuel use of maritime vessels in and around ports. This study determines the technical feasibility of this concept and examines specific options on the U.S. West Coast for deployment practicality and potential for commercialization.The conceptual design of the system is found to be straightforward and technically feasible in several configurations corresponding to various power levels and run times.The most technically viable and commercially attractive deployment options were found to be powering container ships at berth at the Port of Tacoma and/or Seattle, powering tugs at anchorage near the Port of Oakland, and powering refrigerated containers on-board Hawaiian inter-island transport barges. Other attractive demonstration options were found at the Port of Seattle, the Suisun Bay Reserve Fleet, the California Maritime Academy, and an excursion vessel on the Ohio River.

  3. A retrospective tiered environmental assessment of the Mount Storm Wind Energy Facility, West Virginia,USA

    SciTech Connect (OSTI)

    Efroymson, Rebecca Ann; Day, Robin; Strickland, M. Dale

    2012-11-01

    Bird and bat fatalities from wind energy projects are an environmental and public concern, with post-construction fatalities sometimes differing from predictions. Siting facilities in this context can be a challenge. In March 2012 the U.S. Fish and Wildlife Service (USFWS) released Land-based Wind Energy Guidelines to assess collision fatalities and other potential impacts to species of concern and their habitats to aid in siting and management. The Guidelines recommend a tiered approach for assessing risk to wildlife, including a preliminary site evaluation that may evaluate alternative sites, a site characterization, field studies to document wildlife and habitat and to predict project impacts, post construction studies to estimate impacts, and other post construction studies. We applied the tiered assessment framework to a case study site, the Mount Storm Wind Energy Facility in Grant County, West Virginia, USA, to demonstrate the use of the USFWS assessment approach, to indicate how the use of a tiered assessment framework might have altered outputs of wildlife assessments previously undertaken for the case study site, and to assess benefits of a tiered ecological assessment framework for siting wind energy facilities. The conclusions of this tiered assessment for birds are similar to those of previous environmental assessments for Mount Storm. This assessment found risk to individual migratory tree-roosting bats that was not emphasized in previous preconstruction assessments. Differences compared to previous environmental assessments are more related to knowledge accrued in the past 10 years rather than to the tiered structure of the Guidelines. Benefits of the tiered assessment framework include good communication among stakeholders, clear decision points, a standard assessment trajectory, narrowing the list of species of concern, improving study protocols, promoting consideration of population-level effects, promoting adaptive management through post-construction assessment and mitigation, and sharing information that can be used in other assessments.

  4. Fractional-Slot Surface Mounted PM Motors with Concentrated Windings for HEV Traction Drives

    SciTech Connect (OSTI)

    Bailey, J.M.

    2005-10-24

    High-power density and efficiency resulting from elimination of rotor windings and reduced magnetic-flux losses have made the rare earth permanent magnet (PM) motor a leading candidate for the Department of Energy's Office of FreedomCAR and Vehicle Technologies (FCVTs) traction drive motor. These traction drives are generally powered by radial-gap motors, having the magnets on or embedded in a rotating cylinder separated from the inside surface of a slotted cylindrical stator by an annular gap. The two main types of radial-gap PM rotors are those with magnets mounted on the surface of a supporting back iron, called PM surface mounted (PMSM) motors, and those with magnets mounted in slots in the rotor, called interior PM (IPM) motors. Most early PM motor research was on the PMSM motor, which was thought to have an inherently low stator inductance. A low stator inductance can lead to currents dangerously exceeding rated current as the back-emf across the inductance increases with speed; consequently, part of the attempted solution has been to increase the stator inductance to reduce the rate of current rise. Although analysis suggested that there should be no problem designing sufficiently high stator inductance into PMSMs, attempts to do so were often not successful and a motor design was sought that would have a higher intrinsic inductance. Commercial research at Toyota has focused on IPM motors because they can achieve a high-saliency ratio, which helps them operate over a high constant power speed ratio (CPSR), but they are more difficult to fabricate. The Oak Ridge National Laboratory's (ORNL) position has been to continue research on brushless direct current (dc) motors (BDCMs) because of ease of fabrication and increased power output. Recently there has been a revival of interest in a fractional-slot PMSMs [15] made with concentrated windings because they possess three important features. First, they can increase the motor's inductance sufficiently to reduce the characteristic current to value of the rated current, which will enable them to operate at high CPSR. This feature also limits short-circuit fault currents. Second, their segmented structure simplifies assembly problems and is expected to reduce assembly costs. Third, the back-emf waveform is nearly sinusoidal with low cogging. To examine in depth this design ORNL entered into a collaborative agreement with the University of Wisconsin to build and test a 6 kW laboratory demonstration unit. Design, fabrication, and testing of the unit to 4000 rpm were completed during FY 2005. The motor will be sent to ORNL to explore ways to control its inverter to achieve higher efficiency during FY 2006. This paper first reviews the concept of characteristic current and what is meant by optimal flux weakening. It then discusses application of the fractional-slot concentrated winding technique to increase the d-axis inductance of a PMSM showing how this approach differs from an integral-slot motor with sinusoidal-distributed windings. This discussion is followed by a presentation of collaborative analyses and comparison with the University of Wisconsin's measured data on a 6 kW, 36-slot, 30-pole motor with concentrated windings. Finally ORNL presents a PMSM design with integral-slot windings that appears to meet the FreedomCAR Specifications, but has some disadvantages. Further collaboration with the University of Wisconsin is planned for FY 2006 to design a motor that meets FreedomCAR specifications.

  5. 2016 Energy Exchange (Providence, RI)

    Broader source: Energy.gov [DOE]

    The 2016 Energy Exchange in Providence, Rhode Island, will provide training to energy managers and sustainability professionals who are working to improve facility performance, advance the use of renewable energy, and reduce greenhouse gas emissions at federal sites.

  6. Training Session: East Greenwich, RI

    Broader source: Energy.gov [DOE]

    This 3.5-hour training provides builders with a comprehensive review of zero net-energy-ready home construction including the business case, detailed specifications, and opportunities to be...

  7. Fuel Economy and Emissions Effects of Low Tire Pressure, Open Windows, Roof Top and Hitch-Mounted Cargo, and Trailer

    SciTech Connect (OSTI)

    Thomas, John F; Huff, Shean P; West, Brian H

    2014-01-01

    To quantify the fuel economy (FE) effect of some common vehicle accessories or alterations, a compact passenger sedan and a sport utility vehicle (SUV) were subjected to SAE J2263 coastdown procedures. Coastdowns were conducted with low tire pressure, all windows open, with a roof top or hitch-mounted cargo carrier, and with the SUV pulling an enclosed cargo trailer. From these coastdowns, vehicle dynamometer coefficients were developed which enabled the execution of vehicle dynamometer experiments to determine the effect of these changes on vehicle FE and emissions over standard drive cycles and at steady highway speeds. The FE penalty associated with the rooftop cargo box mounted on the compact sedan was as high as 25-27% at higher speeds, where the aerodynamic drag is most pronounced. For both vehicles, use of a hitch mounted cargo tray carrying a similar load resulted in very small FE penalties, unlike the rooftop cargo box. The results for the SUV pulling a 3500 pound enclosed cargo trailer were rather dramatic, resulting in FE penalties ranging from 30%, for the city cycle, to 50% at 80 mph, at which point significant CO generation indicated protective enrichment due to high load. Low tire pressure cases resulted in negligible to 10% FE penalty depending on the specific case and test point. Driving with all four windows open decreased FE by 4-8.5% for the compact sedan, and 1-4% for the SUV.

  8. Radioisotope Thermoelectric Generator Transportation System licensed hardware second certification test series and package shock mount system test

    SciTech Connect (OSTI)

    Ferrell, P.C.; Moody, D.A.

    1996-03-01

    This paper presents a summary of two separate drop test activities that were performed in support of the Radioisotope Thermoelectric Generator (RTG) Transportation System (RTGTS). The first portion of this paper presents the second series of drop testing required to demonstrate that the RTG package design meets the requirements of {ital Title} 10, {ital Code} {ital of} {ital Federal} {ital Regulations}, {open_quote}{open_quote}Part 71{close_quote}{close_quote} (10 CFR 71). Results of the first test series, performed in July 1994, demonstrated that some design changes were necessary. The package design was modified to improve test performance and the design changes were incorporated into the Safety Analysis Report for Packaging (SARP). The second full-size certification test article (CTA-2) incorporated the modified design and was tested at the U.S. Department of Energy{close_quote}s (DOE) Hanford Site near Richland, Washington. With the successful completion of the test series, and pending DOE Office of Facility Safety Analysis approval of the SARP, a certificate of compliance will be issued for the RTG package allowing its use. The second portion of this paper presents the design and testing of the RTG Package Mount System. The RTG package mount was designed to protect the RTG from excessive vibration during transport, provide shock protection during on/off loading, and provide a mechanism for moving the RTG package with a forklift. Military Standard (MIL-STD) 810E, {ital Transit} {ital Drop} {ital Procedure} (DOE 1989), was used to verify that the shock limiting system limited accelerations in excess of 15 G{close_quote}s at frequencies below 150 Hz. Results of the package mount drop tests indicate that an impact force of 15 G{close_quote}s was not exceeded in any test from a free drop height of 457 mm (18 in.). {copyright} {ital 1996 American Institute of Physics.}

  9. Radioisotope Thermoelectric Generator Transporation System licensed hardware second certification test series and package shock mount system test

    SciTech Connect (OSTI)

    Ferrell, P.C.; Moody, D.A.

    1995-10-01

    This paper presents a summary of two separate drop test a e performed in support of the Radioisotope Thermoelectric Generator (RTG) Transportation System (RTGTS). The first portion of this paper presents the second series of drop testing required to demonstrate that the RTG package design meets the requirements of Title 10, Code of Federal Regulations, ``Part 71`` (10 CFR 71). Results of the first test series, performed in July 1994, demonstrated that some design changes were necessary. The package design was modified to improve test performance and the design changes were incorporated into the Safety Analysis Report for Packaging (SARP). The second full-size certification test article (CTA-2) incorporated the modified design and was tested at the US Department of Energy`s (DOE) Hanford Site near Richland, Washington. With the successful completion of the test series, and pending DOE Office of Facility Safety Analysis approval of the SARP, a certificate of compliance will be issued for the RTG package allowing its use. The second portion of this paper presents the design and testing of the RTG Package Mount System. The RTG package mount was designed to protect the RTG from excessive vibration during transport, provide shock protection during on/off loading, and provide a mechanism for moving the RTG package with a forklift. Military Standard (MIL-STD) 810E, Transit Drop Procedure (DOE 1989), was used to verify that the shock limiting system limited accelerations in excess of 15 G`s at frequencies below 150 Hz. Results of the package mount drop tests indicate that an impact force of 15 G`s was not exceeded in any test from a free drop height of 457 mm (18 in.).

  10. Evacuated optical structure comprising optical bench mounted to sidewall of vacuum chamber in a manner which inhibits deflection and rotation of the optical bench

    DOE Patents [OSTI]

    Bowers, J.M.

    1994-04-19

    An improved evacuated optical structure is disclosed comprising an optical bench mounted in a vacuum vessel in a manner which inhibits transmission of movement of the vacuum vessel to the optical bench, yet provides a compact and economical structure. The vacuum vessel is mounted, through a sidewall thereof, to a support wall at four symmetrically positioned and spaced apart areas, each of which comprises a symmetrically positioned group of mounting structures passing through the sidewall of the vacuum vessel. The optical bench is pivotally secured to the vacuum vessel by four symmetrically spaced apart bolts and spherical bearings, each of which is centrally positioned within one of the four symmetrically positioned groups of vacuum vessel mounting structures. Cover plates and o-ring seals are further provided to seal the vacuum vessel mounting structures from the interior of the vacuum vessel, and venting bores are provided to vent trapped gases in the bores used to secure the cover plates and o-rings to the vacuum vessel. Provision for detecting leaks in the mounting structures from the rear surface of the vacuum vessel sidewall facing the support wall are also provided. Deflection to the optical bench within the vacuum vessel is further minimized by tuning the structure for a resonant frequency of at least 100 Hertz. 10 figures.

  11. Evacuated optical structure comprising optical bench mounted to sidewall of vacuum chamber in a manner which inhibits deflection and rotation of the optical bench

    DOE Patents [OSTI]

    Bowers, Joel M.

    1994-01-01

    An improved evacuated optical structure is disclosed comprising an optical bench mounted in a vacuum vessel in a manner which inhibits transmission of movement of the vacuum vessel to the optical bench, yet provides a compact and economical structure. The vacuum vessel is mounted, through a sidewall thereof, to a support wall at four symmetrically positioned and spaced apart areas, each of which comprises a symmetrically positioned group of mounting structures passing through the sidewall of the vacuum vessel. The optical bench is pivotally secured to the vacuum vessel by four symmetrically spaced apart bolts and spherical bearings, each of which is centrally positioned within one of the four symmetrically positioned groups of vacuum vessel mounting structures. Cover plates and o-ring seals are further provided to seal the vacuum vessel mounting structures from the interior of the vacuum vessel, and venting bores are provided to vent trapped gases in the bores used to secure the cover plates and o-rings to the vacuum vessel. Provision for detecting leaks in the mounting structures from the rear surface of the vacuum vessel sidewall facing the support wall are also provided. Deflection to the optical bench within the vacuum vessel is further minimized by tuning the structure for a resonant frequency of at least 100 Hertz.

  12. THE FIRST VERY LONG BASELINE INTERFEROMETRY IMAGE OF A 44GHz METHANOL MASER WITH THE KVN AND VERA ARRAY (KaVA)

    SciTech Connect (OSTI)

    Matsumoto, Naoko; Hirota, Tomoya; Honma, Mareki; Kameya, Osamu; Sunada, Kazuyoshi; Sugiyama, Koichiro; Motogi, Kazuhito; Kim, Kee-Tae; Kim, Mikyoung; Byun, Do-Young; Jung, Taehyun; Kim, Jongsoo; Lyo, A-Ran; Oh, Chungsik; Bae, Jaehan; Chung, Hyunsoo; Chung, Moon-Hee; Cho, Se-Hyung; Chibueze, James O.; Shino, Nagisa; and others

    2014-07-01

    We have carried out the first very long baseline interferometry (VLBI) imaging of a 44GHz class I methanol maser (7{sub 0}-6{sub 1} A {sup +}) associated with a millimeter core MM2 in a massive star-forming region IRAS181511208 with KaVA (KVN and VERA Array), which is a newly combined array of KVN (Korean VLBI Network) and VERA (VLBI Exploration of Radio Astrometry). We have succeeded in imaging compact maser features with a synthesized beam size of 2.7milliarcsecondsנ1.5milliarcseconds (mas). These features are detected at a limited number of baselines within the length of shorter than ?650km corresponding to 100M? in the uv-coverage. The central velocity and the velocity width of the 44GHz methanol maser are consistent with those of the quiescent gas rather than the outflow traced by the SiO thermal line. The minimum component size among the maser features is ?5masנ2mas, which corresponds to the linear size of ?15AUנ6AU assuming a distance of 3kpc. The brightness temperatures of these features range from ?3.5 10{sup 8} to 1.0 10{sup 10}K, which are higher than the estimated lower limit from a previous Very Large Array observation with the highest spatial resolution of ?50mas. The 44GHz class I methanol maser in IRAS181511208 is found to be associated with the MM2 core, which is thought to be less evolved than another millimeter core MM1 associated with the 6.7GHz class II methanol maser.

  13. New Whole-House Solutions Case Study: Lancaster County Career and Technology Center Green Home 3 - Mount Joy, Pennsylvania

    SciTech Connect (OSTI)

    2014-12-01

    This case study describes a unique vocational program at Lancaster County Career Technology Center in Mount Joy, PA, where high school students are gaining hands-on construction experience in building high performance homes with help from Building America team, Home Innovation Research Labs. This collaboration resulted in the Green Home 3, the third in a series of high performance homes for Apprentice Green. As one of LCCTC’s key educational strategies for gaining practical experience, students are involved in building real houses that incorporate state-of-the-art energy efficiency and green technologies. With two homes already completed, the Green Home 3 achieved a 44% whole-house energy savings over the Building America New Construction B10 Benchmark, DOE Zero Energy Ready Home (formerly Challenge Home) certification, and National Green Building Standard Gold-level certification.

  14. Method and apparatus for mounting a dichroic mirror in a microwave powered lamp assembly using deformable tabs

    DOE Patents [OSTI]

    Ury, M.; Sowers, F.; Harper, C.; Love, W.

    1998-11-24

    A microwave powered electrodeless lamp includes an improved screen unit having mesh and solid sections with an internal reflector secured at the juncture of the two sections to reflect light into a light-transmitting chamber defined in the lamp microwave cavity by the reflector and the mesh section. A discharge envelope of a bulb is disposed in the light-transmitting chamber. Light emitted from the envelope is prevented by the reflector from entering the cavity portion bounded by the solid section of the screen. The reflector is mounted in the cavity by tabs formed in the screen unit and bendable into the cavity to define support planes abutting respective surfaces of the reflector. The mesh section and tabs are preferably formed by etching a thin metal sheet. 7 figs.

  15. Method and apparatus for mounting a dichroic mirror in a microwave powered lamp assembly using deformable tabs

    DOE Patents [OSTI]

    Ury, Michael; Sowers, Frank; Harper, Curt; Love, Wayne

    1998-01-01

    A microwave powered electrodeless lamp includes an improved screen unit having mesh and solid sections with an internal reflector secured at the juncture of the two sections to reflect light into a light-transmitting chamber defined in the lamp microwave cavity by the reflector and the mesh section. A discharge envelope of a bulb is disposed in the light-transmitting chamber. Light emitted from the envelope is prevented by the reflector from entering the cavity portion bounded by the solid section of the screen. The reflector is mounted in the cavity by tabs formed in the screen unit and bendable into the cavity to define support planes abutting respective surfaces of the reflector. The mesh section and tabs are preferably formed by etching a thin metal sheet.

  16. Investigation of gas hydrate-bearing sandstone reservoirs at the "Mount Elbert" stratigraphic test well, Milne Point, Alaska

    SciTech Connect (OSTI)

    Boswell, R.M.; Hunter, R.; Collett, T.; Digert, S. Inc., Anchorage, AK); Hancock, S.; Weeks, M. Inc., Anchorage, AK); Mt. Elbert Science Team

    2008-01-01

    In February 2007, the U.S. Department of Energy, BP Exploration (Alaska), Inc., and the U.S. Geological Survey conducted an extensive data collection effort at the "Mount Elbert #1" gas hydrates stratigraphic test well on the Alaska North Slope (ANS). The 22-day field program acquired significant gas hydrate-bearing reservoir data, including a full suite of open-hole well logs, over 500 feet of continuous core, and open-hole formation pressure response tests. Hole conditions, and therefore log data quality, were excellent due largely to the use of chilled oil-based drilling fluids. The logging program confirmed the existence of approximately 30 m of gashydrate saturated, fine-grained sand reservoir. Gas hydrate saturations were observed to range from 60% to 75% largely as a function of reservoir quality. Continuous wire-line coring operations (the first conducted on the ANS) achieved 85% recovery through 153 meters of section, providing more than 250 subsamples for analysis. The "Mount Elbert" data collection program culminated with open-hole tests of reservoir flow and pressure responses, as well as gas and water sample collection, using Schlumberger's Modular Formation Dynamics Tester (MDT) wireline tool. Four such tests, ranging from six to twelve hours duration, were conducted. This field program demonstrated the ability to safely and efficiently conduct a research-level openhole data acquisition program in shallow, sub-permafrost sediments. The program also demonstrated the soundness of the program's pre-drill gas hydrate characterization methods and increased confidence in gas hydrate resource assessment methodologies for the ANS.

  17. Building America Whole-House Solutions for New Homes: Lancaster County Career and Technology Center Green Home 3- Mount Joy, Pennsylvania

    Broader source: Energy.gov [DOE]

    This case study describes a unique vocational program at Lancaster County Career Technology Center in Mount Joy, PA, where high school students are gaining hands-on construction experience in building high performance homes with help from Building America team, Home Innovation Research Labs. This collaboration resulted in the Green Home 3, the third in a series of high performance homes for Apprentice Green.

  18. Inboard seal mounting

    DOE Patents [OSTI]

    Hayes, John R.

    1983-01-01

    A regenerator assembly for a gas turbine engine has a hot side seal assembly formed in part by a cast metal engine block having a seal recess formed therein that is configured to supportingly receive ceramic support blocks including an inboard face thereon having a regenerator seal face bonded thereto. A pressurized leaf seal is interposed between the ceramic support block and the cast metal engine block to bias the seal wear face into sealing engagement with a hot side surface of a rotary regenerator matrix.

  19. Ceramic combustor mounting

    DOE Patents [OSTI]

    Hoffman, Melvin G.; Janneck, Frank W.

    1982-01-01

    A combustor for a gas turbine engine includes a metal engine block including a wall portion defining a housing for a combustor having ceramic liner components. A ceramic outlet duct is supported by a compliant seal on the metal block and a reaction chamber liner is stacked thereon and partly closed at one end by a ceramic bypass swirl plate which is spring loaded by a plurality of circumferentially spaced, spring loaded guide rods and wherein each of the guide rods has one end thereof directed exteriorly of a metal cover plate on the engine block to react against externally located biasing springs cooled by ambient air and wherein the rod spring support arrangement maintains the stacked ceramic components together so that a normal force is maintained on the seal between the outlet duct and the engine block under all operating conditions. The support arrangement also is operative to accommodate a substantial difference in thermal expansion between the ceramic liner components of the combustor and the metal material of the engine block.

  20. Apparatus for mounting crystal

    DOE Patents [OSTI]

    Longeway, Paul A.

    1985-01-01

    A thickness monitor useful in deposition or etching reactor systems comprising a crystal-controlled oscillator in which the crystal is deposited or etched to change the frequency of the oscillator. The crystal rests within a thermally conductive metallic housing and arranged to be temperature controlled. Electrode contacts are made to the surface primarily by gravity force such that the crystal is substantially free of stress otherwise induced by high temperature.

  1. Heat exchanger tube mounts

    DOE Patents [OSTI]

    Wolowodiuk, W.; Anelli, J.; Dawson, B.E.

    1974-01-01

    A heat exchanger in which tubes are secured to a tube sheet by internal bore welding is described. The tubes may be moved into place in preparation for welding with comparatively little trouble. A number of segmented tube support plates are provided which allow a considerable portion of each of the tubes to be moved laterally after the end thereof has been positioned in preparation for internal bore welding to the tube sheet. (auth)

  2. Manipulator mounted transfer platform

    DOE Patents [OSTI]

    Dobbins, James C.; Hoover, Mark A.; May, Kay W.; Ross, Maurice J.

    1990-01-01

    A transfer platform for the conveyance of objects by a manipulator includes a bed frame and saddle clamp secured along an edge of the bed frame and adapted so as to secure the bed frame to a horizontal crosspiece of the manipulator. The platform may thus move with the manipulator in a reciprocal linear path defined by a guide rail. A bed insert may be provided for the support of conveyed objects and a lifting bail may be provided to permit the manipulator arm to install the bed frame upon the crosspiece under remote control.

  3. Geology and mineral resources of the Florence, Beaufort, Rocky Mount, and Norfolk 1/sup 0/ x 2/sup 0/ NTMS quadrangles. National Uranium Resource Evaluation program

    SciTech Connect (OSTI)

    Harris, W.B.

    1982-08-01

    This document provides geologic and mineral resources data for previously-issued Savannah River Laboratory hydrogeochemical and stream sediment reports of the Beaufort, Florence, Norfolk, and Rocky Mount 1/sup 0/ x 2/sup 0/ National Topographic Map Series quadrangles in the southeastern United States. This report is issued in draft form, without detailed technical and copy editing. This was done to make the report available to the public before the end of the National Uranium Resource Evaluation program.

  4. Portable mass spectrometer with one or more mechanically adjustable electrostatic sectors and a mechanically adjustable magnetic sector all mounted in a vacuum chamber

    DOE Patents [OSTI]

    Andresen, Brian D. (Livermore, CA); Eckels, Joel D. (Livermore, CA); Kimmons, James F. (Manteca, CA); Martin, Walter H. (Byron, CA); Myers, David W. (Livermore, CA); Keville, Robert F. (Acampo, CA)

    1992-01-01

    A portable mass spectrometer is described having one or more electrostatic focusing sectors and a magnetic focusing sector, all of which are positioned inside a vacuum chamber, and all of which may be adjusted via adjustment means accessible from outside the vacuum chamber. Mounting of the magnetic sector entirely within the vacuum chamber permits smaller magnets to be used, thus permitting reductions in both weight and bulk.

  5. Portable mass spectrometer with one or more mechanically adjustable electrostatic sectors and a mechanically adjustable magnetic sector all mounted in a vacuum chamber

    DOE Patents [OSTI]

    Andresen, B.D.; Eckels, J.D.; Kimmons, J.F.; Martin, W.H.; Myers, D.W.; Keville, R.F.

    1992-10-06

    A portable mass spectrometer is described having one or more electrostatic focusing sectors and a magnetic focusing sector, all of which are positioned inside a vacuum chamber, and all of which may be adjusted via adjustment means accessible from outside the vacuum chamber. Mounting of the magnetic sector entirely within the vacuum chamber permits smaller magnets to be used, thus permitting reductions in both weight and bulk. 13 figs.

  6. Small-Scale Solar Grants (Commerce RI)

    Broader source: Energy.gov [DOE]

    Commerce RI provides incentives for renewable-energy projects. Incentive programs are funded by the Rhode Island Renewable Energy Fund (REF) and alternative compliance payments (ACPs) from the...

  7. Method and device for determining the position of a cutting tool relative to the rotational axis of a spindle-mounted workpiece

    DOE Patents [OSTI]

    Williams, R.R.

    1980-09-03

    The present invention is directed to a method and device for determining the location of a cutting tool with respect to the rotational axis of a spindle-mounted workpiece. A vacuum cup supporting a machinable sacrificial pin is secured to the workpiece at a location where the pin will project along and encompass the rotational axis of the workpiece. The pin is then machined into a cylinder. The position of the surface of the cutting tool contacting the machine cylinder is spaced from the rotational axis of the workpiece a distance equal to the radius of the cylinder.

  8. Method and device for determining the position of a cutting tool relative to the rotational axis of a spindle-mounted workpiece

    DOE Patents [OSTI]

    Williams, Richard R.

    1982-01-01

    The present invention is directed to a method and device for determining the location of a cutting tool with respect to the rotational axis of a spindle-mounted workpiece. A vacuum cup supporting a machinable sacrifical pin is secured to the workpiece at a location where the pin will project along and encompass the rotational axis of the workpiece. The pin is then machined into a cylinder. The position of the surface of the cutting tool contacting the machine cylinder is spaced from the rotational aixs of the workpiece a distance equal to the radius of the cylinder.

  9. Center for Energy Efficient Design

    High Performance Buildings Database

    Rocky Mount, VA As the first Passivhaus public school in North America, the Center for Energy Efficient Design (CEED) in Rocky Mount, Virginia, is a national model for green school construction. An extension of The Leonard A.

  10. A=20Ne (1987AJ02)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1986VA18, 1986VA23, 1986WE1C, 1987FA09, 1987KO15, 1987NI04, 1987RI03, 1987RO10). Muon and neutrino capture and reactions: (1983RO1E, 1984EL1D, 1984GR03, 1985MI1D,...

  11. A=11B (1985AJ01)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PDF or PS). Shell and deformed models:(1981BO1Y, 1981RA06, 1982BO01, 1983VA31, 1984VA06). Cluster model:(1979NI06, 1980FU1G, 1983SH38). Special states:(1979NI06, 1980RI06,...

  12. Building America Case Study: Advanced Extended Plate and Beam Wall System in a Cold-Climate House, Mount Joy, Pennsylvania (Fact Sheet), Efficient Solutions for New Homes, Energy Efficiency & Renewable Energy (EERE)

    Energy Savers [EERE]

    Advanced Extended Plate and Beam Wall System in a Cold-Climate House Mount Joy, Pennsylvania PROJECT INFORMATION Construction: New home Type: Single-family Partner: Home Innovation Research Labs, homeinnovation.com Builder: LCCTC, Mount Joy, PA Size: 2,660 ft 2 above grade, 3,990 ft 2 conditioned area Price Range: $300,000 Date Completed: June 2015 Climate Zone: Cold (IECC 5A) PERFORMANCE DATA HERS index score: 45 (DOE ZERH target index: 48) Projected annual energy cost savings: $1,163

  13. US SoAtl VA Site Consumption

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Consumption Survey www.eia.govconsumptionresidential Space heating Water heating Air conditioning Appliances, electronics, lighting Household Energy Use in Virginia ...

  14. The VA's sorry, the army's silent

    SciTech Connect (OSTI)

    Freeman, K.

    1993-03-01

    Fifty years after the fact, the U.S. government is slowly moving to compensate World War II victims of mustard gas tests. Although the U.S. Department of Veterans attests to readiness to compensate the U.S. servicemen, a fog of military secrecy still makes the veteran's fight for recognition and compensation far from over. The Florida veterans, like most of the others, had been unable to get disability benefits because their service records did not document their participation in the secret tests and did not list the chemicals to which they had been exposed.

  15. Examination of core samples from the Mount Elbert Gas Hydrate Stratigraphic Test Well, Alaska North Slope: Effects of retrieval and preservation

    SciTech Connect (OSTI)

    Kneafsey, T.J.; Liu, T.J. H.; Winters, W.; Boswell, R.; Hunter, R.; Collett, T.S.

    2011-06-01

    Collecting and preserving undamaged core samples containing gas hydrates from depth is difficult because of the pressure and temperature changes encountered upon retrieval. Hydrate-bearing core samples were collected at the BPXA-DOE-USGS Mount Elbert Gas Hydrate Stratigraphic Test Well in February 2007. Coring was performed while using a custom oil-based drilling mud, and the cores were retrieved by a wireline. The samples were characterized and subsampled at the surface under ambient winter arctic conditions. Samples thought to be hydrate bearing were preserved either by immersion in liquid nitrogen (LN), or by storage under methane pressure at ambient arctic conditions, and later depressurized and immersed in LN. Eleven core samples from hydrate-bearing zones were scanned using x-ray computed tomography to examine core structure and homogeneity. Features observed include radial fractures, spalling-type fractures, and reduced density near the periphery. These features were induced during sample collection, handling, and preservation. Isotopic analysis of the methane from hydrate in an initially LN-preserved core and a pressure-preserved core indicate that secondary hydrate formation occurred throughout the pressurized core, whereas none occurred in the LN-preserved core, however no hydrate was found near the periphery of the LN-preserved core. To replicate some aspects of the preservation methods, natural and laboratory-made saturated porous media samples were frozen in a variety of ways, with radial fractures observed in some LN-frozen sands, and needle-like ice crystals forming in slowly frozen clay-rich sediments. Suggestions for hydrate-bearing core preservation are presented.

  16. Analysis of core samples from the BPXA-DOE-USGS Mount Elbert gas hydrate stratigraphic test well: Insights into core disturbance and handling

    SciTech Connect (OSTI)

    Kneafsey, Timothy J.; Lu, Hailong; Winters, William; Boswell, Ray; Hunter, Robert; Collett, Timothy S.

    2009-09-01

    Collecting and preserving undamaged core samples containing gas hydrates from depth is difficult because of the pressure and temperature changes encountered upon retrieval. Hydrate-bearing core samples were collected at the BPXA-DOE-USGS Mount Elbert Gas Hydrate Stratigraphic Test Well in February 2007. Coring was performed while using a custom oil-based drilling mud, and the cores were retrieved by a wireline. The samples were characterized and subsampled at the surface under ambient winter arctic conditions. Samples thought to be hydrate bearing were preserved either by immersion in liquid nitrogen (LN), or by storage under methane pressure at ambient arctic conditions, and later depressurized and immersed in LN. Eleven core samples from hydrate-bearing zones were scanned using x-ray computed tomography to examine core structure and homogeneity. Features observed include radial fractures, spalling-type fractures, and reduced density near the periphery. These features were induced during sample collection, handling, and preservation. Isotopic analysis of the methane from hydrate in an initially LN-preserved core and a pressure-preserved core indicate that secondary hydrate formation occurred throughout the pressurized core, whereas none occurred in the LN-preserved core, however no hydrate was found near the periphery of the LN-preserved core. To replicate some aspects of the preservation methods, natural and laboratory-made saturated porous media samples were frozen in a variety of ways, with radial fractures observed in some LN-frozen sands, and needle-like ice crystals forming in slowly frozen clay-rich sediments. Suggestions for hydrate-bearing core preservation are presented.

  17. Analysis of long-period seismic waves excited by the May 18, 1980, eruption of Mount St. Helens: a terrestrial monopole

    SciTech Connect (OSTI)

    Kanamori, H.; Given, J.W.

    1982-07-10

    Long-period (100 to 260 s) Love and Rayleigh waves excited by the eruption of Mount St. Helens on May 18, 1980, and recorded by ID, SRO, and ASRO stations were analyzed to determine the mechanism of the eruption. The amplitude radiation patterns of both Rayleigh and Love waves are two lobed with nodal direction in E5/sup 0/S for Rayleigh waves and in N5/sup 0/E for Love waves. These radiation patterns preclude any double-couple mechanism. The radiation pattern, the initial phase, the relatively large amplitude ratio of Love to Rayleigh waves and the existence of clear nodes in the radiation patterns of fundamental mode and higher-mode Rayleigh waves suggest that the source is represented by an almost horizontal (less than 15/sup 0/ from the horizontal) single force pointed toward S5/sup 0/W. The surface wave spectra fall off very rapidly at periods shorter than 75 s suggesting a very slow source process. Although the details of the source time history could not be determined, a smooth bell-shaped time function: f/sub 0/s(t) = (1/2)f/sub 0/(1-cos( (t)/(tau) ..pi..)) for 0< or =t< or =2tau and f/sub 0/s(t) = 0 for t> or =2tau, with tau = 75 s is considered appropriate on the basis of comparison between synthetic and observed seismograms and of the shape of the source spectrum. The peak value of the force f/sub 0/ is about 10/sup 18/ dynes. The tailing end of the source time function could not be resolved, and some overshoot may be added. The magnitude and the time history of the force can be explained by a northward landslide followed by a lateral blast observed at the time of the eruption. Two distinct events about 110 apart can be identified on body wave and short-period surface wave records. The first event may correspond to the earthquake which triggered the landslide and the lateral blast. The second event appears to correspond to a second large earthquake and explosion which took place about 2 minutes after the first earthquake.

  18. QER Public Meeting in Providence, RI & Hartford, CT: New England...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Power Company Remarks of John F. Bilda, General Manager, ... of the United States, Canada & Australia 1 - The ... PDF icon Remarks of Kevin R. Hennessy PDF icon Remarks of ...

  19. Department of energy oak riDge office

    Energy Savers [EERE]

    legacies resulting from more than 60 years of nuclear weapons development and ... at the former K-25 site in the next 5-7 years, DOE will continue with cleanup at Y-12 ...

  20. F-1 U.S. Energy Information Administration | Annual Energy Outlook...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Central West North Central East North Central Mountain AK WA MT WY ID NV UT CO AZ NM TX OK IA KS MO IL IN KY TN MS AL FL GA SC NC WV PA NJ MD DE NY CT VT ME RI MA NH VA WI MI OH...

  1. F-5 U.S. Energy Information Administration | Annual Energy Outlook...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Figure F4. Oil and Gas Supply Model Regions Atlantic WA MT WY ID NV UT CO AZ NM TX OK IA KS MO IL IN KY TN MS AL FL GA SC NC WV PA NJ MD DE NY CT ME RI MA NH VA WI MI OH NE...

  2. Microsoft Word - figure_03.doc

    U.S. Energy Information Administration (EIA) Indexed Site

    IN OH TN WV VA KY MD PA NY VT NH MA CT ME RI DE DC NC SC GA FL NJ AL MS LA MO AR TX NM OK CO KS UT AZ WY NE IL IA MN WI ND SD ID MT WA OR NV CA HI AK MI Gulf of Mexico Volume

  3. Microsoft Word - figure_14.doc

    U.S. Energy Information Administration (EIA) Indexed Site

    42 Figure 14. Net interstate movements, imports, and exports of natural gas in the United States, 2014 (million cubic feet) Norway Trinidad/ Tobago Yemen Trinidad/ Tobago Interstate Movements Not Shown on Map From Volume To From Volume To CT RI Other TX IN MA RI MA MA CT VA DC MD DC VT MA NH MA WA M T I D O R W Y ND SD C A N V U T CO NE KS A Z NM OK TX MN WI MI IA I L IN OH MO AR M S AL GA T N KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI A K Mexico C a n a d a C a n a d a Canada

  4. Hydromechanical transmission with three simple planetary assemblies, one sun gear being mounted on the output shaft and the other two on a common shaft connected to an input-driven hydraulic module

    DOE Patents [OSTI]

    Orshansky, Jr., deceased, Elias; Weseloh, William E.

    1978-01-01

    A power transmission having three simple planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the sun gears of the first two planetary assemblies, these two sun gears being connected together on a common shaft. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft is also connected to drive the second ring gear and, furthermore is clutchable to the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the second planetary assembly drives the ring gear of the third planetary assembly, which is clutchable to the output shaft, and the sun gear of the third planetary assembly is mounted rigidly to the output shaft.

  5. VA-MD-DC Hydrogen Education for Decision Makers

    Broader source: Energy.gov [DOE]

    2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

  6. VA-s--- ' At&LYTlCAL DATA SHEET

    Office of Legacy Management (LM)

    type respirators and extinguished the fire from oil PH an upwind position. Sample No. ... The smoke No, Ro and fumes resulting from the fire went in the direction of oil PH ' this ...

  7. Heavy ion beam probe operation in time va

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    operation in time varying equilibria of improved confinement reversed field pinch discharges D. R. Demers, X. Chen, P. M. Schoch, and P. J. Fimognari Citation: Rev. Sci. Instrum. 81, 10E109 (2010); doi: 10.1063/1.3479109 View online: http://dx.doi.org/10.1063/1.3479109 View Table of Contents: http://rsi.aip.org/resource/1/RSINAK/v81/i10 Published by the American Institute of Physics. Additional information on Rev. Sci. Instrum. Journal Homepage: http://rsi.aip.org Journal Information:

  8. DOE - Office of Legacy Management -- Reynolds Metals Co - VA...

    Office of Legacy Management (LM)

    Designated Name: Not Designated Alternate Name: Virginia-Carolina Chemical Corporation ... Status of Former Virginia-Carolina Chemical Corporation Site at 818 Perry Street, ...

  9. Photovoltaic array mounting apparatus, systems, and methods

    DOE Patents [OSTI]

    West, Jack Raymond; Atchley, Brian; Hudson, Tyrus Hawkes; Johansen, Emil

    2015-04-14

    A photovoltaic array, including: (a) supports laid out on a surface in rows and columns; (b) photovoltaic modules positioned on top of the supports; and (c) fasteners connecting the photovoltaic modules to the supports, wherein the supports have an upper pedestal surface and a lower pedestal surface such that the photovoltaic modules are positioned at a non-horizontal angle when edges of the photovoltaic modules are positioned on top of the upper and lower pedestal surfaces, and wherein a portion of the fasteners rotate to lock the photovoltaic modules onto the supports.

  10. Photovoltaic array mounting apparatus, systems, and methods

    DOE Patents [OSTI]

    West, Jack Raymond; Atchley, Brian; Hudson, Tyrus Hawkes; Johansen, Emil

    2016-01-05

    A photovoltaic array, including: (a) supports laid out on a surface in rows and columns; (b) photovoltaic modules positioned on top of the supports; and (c) fasteners connecting the photovoltaic modules to the supports, wherein the supports have an upper pedestal surface and a lower pedestal surface such that the photovoltaic modules are positioned at a non-horizontal angle when edges of the photovoltaic modules are positioned on top of the upper and lower pedestal surfaces, and wherein a portion of the fasteners rotate to lock the photovoltaic modules onto the supports.

  11. Mount Wachusetts Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    CEI - Iberdrola Energy Purchaser Princeton Municipal Light Location Near Princeton MA Coordinates 42.588458, -71.98387 Show Map Loading map... "minzoom":false,"mappingse...

  12. Fiber optic mounted laser driven flyer plates

    DOE Patents [OSTI]

    Paisley, Dennis L. (Santa Fe, NM)

    1991-01-01

    A laser driven flyer plate where the flyer plate is deposited directly onto the squared end of an optical fiber. The plasma generated by a laser pulse drives the flyer plate toward a target. In another embodiment, a first metal layer is deposited onto the squared end of an optical fiber, followed by a layer of a dielectric material and a second metal layer. The laser pulse generates a plasma in the first metal layer, but the plasma is kept away from the second metal layer by the dielectric layer until the pressure reaches the point where shearing occurs.

  13. Fiber optic mounted laser driven flyer plates

    SciTech Connect (OSTI)

    Paisley, D.L.

    1990-12-31

    This invention is comprised of a laser driven flyer plate where the flyer plate is deposited directly onto the squared end of an optical fiber. The plasma generated by a laser pulse drives the flyer plate toward a target. In another embodiment, a first metal layer is deposited onto the squared end of an optical fiber, followed by a layer of a dielectric material and a second metal layer. The laser pulse generates a plasma in the first metal layer, but the plasma is kept away from the second metal layer by the dielectric layer until the pressure reaches the point where shearing occurs. 2 figs.

  14. Fiber optic mounted laser driven flyer plates

    SciTech Connect (OSTI)

    Paisley, D.L.

    1991-07-09

    A laser driven flyer plate is described where the flyer plate is deposited directly onto the squared end of an optical fiber. The plasma generated by a laser pulse drives the flyer plate toward a target. In another embodiment, a first metal layer is deposited onto the squared end of an optical fiber, followed by a layer of a dielectric material and a second metal layer. The laser pulse generates a plasma in the first metal layer, but the plasma is kept away from the second metal layer by the dielectric layer until the pressure reaches the point where shearing occurs.

  15. Fiber optic mounted laser driven flyer plates

    SciTech Connect (OSTI)

    Paisley, D.L.

    1990-01-01

    This invention is comprised of a laser driven flyer plate where the flyer plate is deposited directly onto the squared end of an optical fiber. The plasma generated by a laser pulse drives the flyer plate toward a target. In another embodiment, a first metal layer is deposited onto the squared end of an optical fiber, followed by a layer of a dielectric material and a second metal layer. The laser pulse generates a plasma in the first metal layer, but the plasma is kept away from the second metal layer by the dielectric layer until the pressure reaches the point where shearing occurs. 2 figs.

  16. Laboratory Performance Testing of Residential Window Mounted...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This presentation was delivered at the U.S. Department of Energy Building America Technical Update meeting on April 29-30, 2013, in Denver, Colorado. PDF icon testingresidentiala...

  17. Mount Amiata Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    World Geothermal Power Generation 2001-2005. Proceedings of World Geothermal Congress; Turkey: World Geothermal Congress. List of existing Geothermal Resource Areas. Print PDF...

  18. Mount Spurr Geothermal Project | Open Energy Information

    Open Energy Info (EERE)

    ectangles":,"copycoords":false,"static":false,"wmsoverlay":"","layers":,"controls":"pan","zoom","type","scale","streetview","zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoi...

  19. X-ray CT Observations of Methane Hydrate Distribution Changes over Time in a Natural Sediment Core from the BPX-DOE-USGS Mount Elbert Gas Hydrate Stratigraphic Test Well

    SciTech Connect (OSTI)

    Kneafsey, T.J.; Rees, E.V.L.

    2010-03-01

    When maintained under hydrate-stable conditions, methane hydrate in laboratory samples is often considered a stable and immobile solid material. Currently, there do not appear to be any studies in which the long-term redistribution of hydrates in sediments has been investigated in the laboratory. These observations are important because if the location of hydrate in a sample were to change over time (e.g. by dissociating at one location and reforming at another), the properties of the sample that depend on hydrate saturation and pore space occupancy would also change. Observations of hydrate redistribution under stable conditions are also important in understanding natural hydrate deposits, as these may also change over time. The processes by which solid hydrate can move include dissociation, hydrate-former and water migration in the gas and liquid phases, and hydrate formation. Chemical potential gradients induced by temperature, pressure, and pore water or host sediment chemistry can drive these processes. A series of tests were performed on a formerly natural methane-hydrate-bearing core sample from the BPX-DOE-USGS Mount Elbert Gas Hydrate Stratigraphic Test Well, in order to observe hydrate formation and morphology within this natural sediment, and changes over time using X-ray computed tomography (CT). Long-term observations (over several weeks) of methane hydrate in natural sediments were made to investigate spatial changes in hydrate saturation in the core. During the test sequence, mild buffered thermal and pressure oscillations occurred within the sample in response to laboratory temperature changes. These oscillations were small in magnitude, and conditions were maintained well within the hydrate stability zone.

  20. Portsmouth RI/FS Report for the Site-Wide Waste Disposition Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for the Site-Wide Waste Disposition Evaluation Project at the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio, presents the information necessary to select a Site-wide...

  1. Streamlined RI/FS planning for the groundwater operable unit at the Weldon Spring Site

    SciTech Connect (OSTI)

    Picel, M.H.; Durham, L.A.; Blunt, D.L.; Hartmann, H.M.

    1995-12-31

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the chemical plant area of the Weldon Spring Site located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis and 22 km (14 mi) southwest of the City of St. Charles. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium processing activities conducted by the U.S. Atomic Energy Commission during the 1950s and 1960s. The Army also used the chemical plant area for the production of explosives in the 1940s. The Weldon Spring Site chemical plant area was listed on the National Priorities List (NPL) in 1989. Adjacent to the chemical plant area is another NPL site known as the Weldon Spring Ordnance Works. The ordnance works area is a former explosive production facility that manufactured trinitrotoluene (TNT) and dinitrotoluene (DNT) during World War II. The ordnance works area covers 7,000 ha (17,232 acres); cleanup of this site is managed by the U.S. Army Corps of Engineers (CE).

  2. Portsmouth RI/FS Report for the Process Buildings and Complex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project Portsmouth RIFS Report for the Process Buildings and Complex Facilities ...

  3. Risk Assessment in the RI/FS process, and derivation of cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Conceptual Site Model, fate and transport, remedial action objectives Human Health Risk Assessment * Multiple "scenarios" were evaluated, each with different exposure assumptions...

  4. SwRI's HEDGE Technology for High Efficiency, Low Emissions Gasoline Engines

    Broader source: Energy.gov [DOE]

    Presentation given at the 16th Directions in Engine-Efficiency and Emissions Research (DEER) Conference in Detroit, MI, September 27-30, 2010.

  5. Scoping Document: Quarry Residuals Remedial Investigation/Feasibility Study (RI/FS) Scoping Document.

    Office of Legacy Management (LM)

  6. Year Month U.S. Average PAD District I Average CT ME MA NH RI

    Gasoline and Diesel Fuel Update (EIA)

    1994 January ... 89.6 91.0 90.2 83.8 88.4 80.4 87.3 88.8 92.1 102.5 February ... 92.9 94.6 93.8 90.4 91.3 86.6 91.4 92.3 91.5 105.5...

  7. Year Month U.S. Average PAD District I Average CT ME MA NH RI

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    1993 January ... 94.3 95.7 94.9 85.2 94.0 87.1 91.7 93.4 91.2 105.2 February ... 94.6 95.9 96.2 85.4 94.4 86.9 91.8 93.3 90.8 106.8...

  8. Year Month U.S. Average PAD District I Average CT ME MA NH RI

    U.S. Energy Information Administration (EIA) Indexed Site

    1995 January ... 86.9 87.6 86.7 77.8 84.8 78.4 87.3 85.7 88.4 102.4 February ... 87.4 88.2 87.8 77.4 84.9 78.5 87.3 85.9 88.5 103.4...

  9. Year Month U.S. Average PAD District I Average CT ME MA NH RI

    Gasoline and Diesel Fuel Update (EIA)

    1996 January ... 94.6 96.1 94.5 93.0 92.0 89.1 94.9 92.6 94.7 111.7 February ... 95.9 97.5 96.2 93.2 93.8 90.8 95.6 93.7 94.4 112.9...

  10. Year Month U.S. Average PAD District I Average CT ME MA NH RI

    U.S. Energy Information Administration (EIA) Indexed Site

    1997 January ... 107.9 109.0 108.6 105.2 106.5 102.1 107.0 104.4 106.5 130.4 February ... 105.1 106.0 105.2 102.2 103.4 101.0 104.5...

  11. http://www.hss.energy.gov/csa/analysis/rems/rems/ri.htm

    National Nuclear Security Administration (NNSA)

    6th 7th 8th 9th Year 2010 2009 2008 2007 2006 2005 Program Office All Energy Efficiency and Renewable Energy National Nuclear Security Administration Office of Civilian ...

  12. http://www.hss.energy.gov/csa/analysis/rems/rems/ri.htm

    National Nuclear Security Administration (NNSA)

    Renewable Energy National Nuclear Security Administration Office of Civilian Radioactive Waste Management Office of Environmental Management Office of Fossil Energy Operations...

  13. 2011 Organometallic Chemistry (July 10-15, 2011, Salve Regina University, Newport, RI)

    SciTech Connect (OSTI)

    Dr. Emilio Bunel

    2011-07-15

    Organometallic chemistry has played and will continue to play a significant role in helping us understand the way bonds are made or broken in the presence of a transition metal complex. Current challenges range from the efficient exploitation of energy resources to the creative use of natural and artificial enzymes. Most of the new advances in the area are due to our extended understanding of processes at a molecular level due to new mechanistic studies, techniques to detect reaction intermediates and theory. The conference will bring the most recent advances in the field including nanocatalysis, surface organometallic chemistry, characterization techniques, new chemical reactivity and theoretical approaches along with applications to organic synthesis and the discovery of new materials. The Conference will bring together a collection of investigators who are at the forefront of their field, and will provide opportunities for junior scientists and graduate students to present their work in poster format and exchange ideas with leaders in the field. Six outstanding posters will be selected for short talks. The collegial atmosphere of this Conference, with programmed discussion sessions as well as opportunities for informal gatherings in the afternoons and evenings, provides an avenue for scientists from different disciplines to brainstorm and promotes cross-disciplinary collaborations in the various research areas represented. Graduate students and postdoctoral fellows should also consider participating in the Gordon Research Seminar on Organometallic Chemistry (July 9-10, same location) which is specially designed to promote interaction and discussion between junior scientists.

  14. Dissecting the cAMP-inducible allosteric switch in protein kinase A RI alpha

    SciTech Connect (OSTI)

    Sjoberg, T.J.; Kornev, A.P.; Taylor, S.S.; /SLAC

    2012-08-23

    The regulatory subunits of cAMP-dependent protein kinase (PKA) are the major receptors of cAMP in most eukaryotic cells. As the cyclic nucleotide binding (CNB) domains release cAMP and bind to the catalytic subunit of PKA, they undergo a major conformational change. The change is mediated by the B/C helix in CNB-A, which extends into one long helix that now separates the two CNB domains and docks onto the surface of the catalytic subunit. We explore here the role of three key residues on the B/C helix that dock onto the catalytic subunit, Arg226, Leu233, and Met 234. By replacing each residue with Ala, we show that each contributes significantly to creating the R:C interface. By also deleting the second CNB domain (CNB-B), we show furthermore that CNB-B is a critical part of the cAMP-induced conformational switch that dislodges the B/C helix from the surface of the catalytic subunit. Without CNB-B the K{sub a} for activation by cAMP increases from 80 to 1000 nM. Replacing any of the key interface residues with Ala reduces the K{sub a} to 25-40 nM. Leu233 and M234 contribute to a hydrophobic latch that binds the B/C helix onto the large lobe of the C-subunit, while Arg226 is part of an electrostatic switch that couples the B/C helix to the phosphate binding cassette where the cAMP docks.

  15. QER Public Meeting in Providence, RI & Hartford, CT: New England Regional Infrastructure Constraints

    Broader source: Energy.gov [DOE]

    Meeting Files: Meeting Agenda, Meeting Briefing Memo, Federal Register Notice, Meeting Summary, Transcript of Meeting, and Panelist Remarks

  16. Final Update on APBF-DEC EGR/DPF/SCR Demonstration Project at SwRI |

    Broader source: Energy.gov (indexed) [DOE]

    for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En | Department of Energy Proposed Action: To determine a rail alignment within a rail corridor in which to construct and operate a railroad to transport spent nuclear fuel, high-level radioactive waste, and other materials from an existing railroad in Nevada to a repository at Yucca Mountain, Nye County, Nevada. The

  17. Sample mounting and transfer for coupling an ultrahigh vacuum...

    Office of Scientific and Technical Information (OSTI)

    40204838 Resource Type: Journal Article Resource Relation: Journal Name: Review of Scientific Instruments; Journal Volume: 72; Journal Issue: 1; Other Information: DOI:...

  18. Inner shell radial pin geometry and mounting arrangement

    DOE Patents [OSTI]

    Leach, David (Niskayuna, NY); Bergendahl, Peter Allen (Scotia, NY)

    2002-01-01

    Circumferentially spaced arrays of support pins are disposed through access openings in an outer turbine shell and have projections received in recesses in forward and aft sections of an inner turbine shell supported from the outer shell. The projections have arcuate sides in a circumferential direction affording line contacts with the side walls of the recesses and are spaced from end faces of the recesses, enabling radial and axial expansion and contraction of the inner shell relative to the outer shell. All loads are taken up in a tangential direction by the outer shell with the support pins taking no radial loadings.

  19. Mount Hope, Kansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hope, Kansas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 37.8686224, -97.665047 Show Map Loading map... "minzoom":false,"mappingservice":"...

  20. NedPower Mount Storm Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Shell Wind EnergyDominion Energy Developer NedPowerShell Wind EnergyDominion Energy...

  1. Method for mounting laser fusion targets for irradiation

    DOE Patents [OSTI]

    Fries, R. Jay; Farnum, Eugene H.; McCall, Gene H.

    1977-07-26

    Methods for preparing laser fusion targets of the ball-and-disk type are disclosed. Such targets are suitable for irradiation with one or two laser beams to produce the requisite uniform compression of the fuel material.

  2. The Cummins Rocky Mount Engine Plant Case Study | Department...

    Broader source: Energy.gov (indexed) [DOE]

    a 12.6% energy performance improvement after implementing SEP. (July 2015) Cummins' Case Study for Superior Energy Performance More Documents & Publications SEP Case Study...

  3. Solar Install Mount Production Labor Equipment Simple Balance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The SIMPLE BoS project utilizes systems engineering for designing, testing, and manufacturing the project designs. The transition from stakeholder requirements and conceptual ideas ...

  4. Direct mounted photovoltaic device with improved front clip

    DOE Patents [OSTI]

    Keenihan, James R; Boven, Michelle; Brown, Jr., Claude; Gaston, Ryan S; Hus, Michael; Langmaid, Joe A; Lesniak, Mike

    2013-11-05

    The present invention is premised upon a photovoltaic assembly system for securing and/or aligning at least a plurality of vertically adjacent (overlapping) photovoltaic device assemblies to one another. The securing function being accomplished by a clip member that may be a separate component or integral to one or more of the photovoltaic device assemblies.

  5. Direct mounted photovoltaic device with improved side clip

    DOE Patents [OSTI]

    Keenihan, James R; Boven, Michelle L; Brown, Jr., Claude; Eurich, Gerald K; Gaston, Ryan S; Hus, Michael

    2013-11-19

    The present invention is premised upon a photovoltaic assembly system for securing and/or aligning at least a plurality of vertically adjacent photovoltaic device assemblies to one another. The securing function being accomplished by a clip member that may be a separate component or integral to one or more of the photovoltaic device assemblies.

  6. Mount Nittany Elementary School Wind Turbine | Open Energy Information

    Open Energy Info (EERE)

    - Yankton School District Wind Project

  7. Temporal Geochemical Variations In Volatile Emissions From Mount...

    Open Energy Info (EERE)

    1980. Based on D modeling, approximately 63% of shallow, post-1980 magma has yet to degas. Surprisingly, Cl and F contents in the 1994 samples were only 0.47 and 3.8%,...

  8. Hydrothermal Circulation At Mount St Helens Determined By Self...

    Open Energy Info (EERE)

    and modulated on short time scales by surface recharge. Authors Paul A. Bedrosian, Martyn J. Unsworth and Malcolm J. S. Johnston Published Journal Journal of Volcanology and...

  9. An active seismic reconnaissance survey of the Mount Princeton...

    Open Energy Info (EERE)

    area, Chaffee County, ColoradoThesisDissertation Abstract Abstract unavailable. Author J.S. Crompton Organization Colorado School of Mines Published Publisher Not Provided, 1976...

  10. Integrated head package for top mounted nuclear instrumentation

    DOE Patents [OSTI]

    Malandra, Louis J.; Hornak, Leonard P.; Meuschke, Robert E.

    1993-01-01

    A nuclear reactor such as a pressurized water reactor has an integrated head package providing structural support and increasing shielding leading toward the vessel head. A reactor vessel head engages the reactor vessel, and a control rod guide mechanism over the vessel head raises and lowers control rods in certain of the thimble tubes, traversing penetrations in the reactor vessel head, and being coupled to the control rods. An instrumentation tube structure includes instrumentation tubes with sensors movable into certain thimble tubes disposed in the fuel assemblies. Couplings for the sensors also traverse penetrations in the reactor vessel head. A shroud is attached over the reactor vessel head and encloses the control rod guide mechanism and at least a portion of the instrumentation tubes when retracted. The shroud forms a structural element of sufficient strength to support the vessel head, the control rod guide mechanism and the instrumentation tube structure, and includes radiation shielding material for limiting passage of radiation from retracted instrumentation tubes. The shroud is thicker at the bottom adjacent the vessel head, where the more irradiated lower ends of retracted sensors reside. The vessel head, shroud and contents thus can be removed from the reactor as a unit and rested safely and securely on a support.

  11. Constant power speed range extension of surface mounted PM motors

    DOE Patents [OSTI]

    Lawler, Jack Steward; Bailey, John Milton

    2001-01-01

    A circuit and method for controlling a rotating machine (11) in the constant horsepower range above base speed uses an inverter (15) having SCR's (T1-T6) connected in series with the primary commutation switches (Q1-Q6) to control turn off of the primary commutation switches and to protect the primary commutation switches from faults. The primary commutation switches (Q1-Q6) are controlled by a controller (14), to fire in advance or after a time when the back emf equals the applied voltage, and then to turn off after a precise dwell time, such that suitable power is developed at speeds up to at least six times base speed.

  12. Mount Chase, Maine: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.0777595, -68.4894535 Show Map Loading map... "minzoom":false,"mappingservice":"googlemaps3","type"...

  13. Evolution Of Hydrothermal Waters At Mount St Helens, Washington...

    Open Energy Info (EERE)

    sheets, yet have thus far been largely undocumented. Authors Lisa Shevenell and Fraser Goff Published Journal Journal of Volcanology and Geothermal Research, 1995 DOI Not Provided...

  14. A new day: SWiFT reaches rotor mounting milestone

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, ... on one of its SWiFT wind turbines, a heavily modified ...

  15. Mount Macedon, Australia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    needs updating Image needs updating Reference needed Missing content Broken link Other Additional Comments Cancel Submit Categories: Places Articles with outstanding TODO tasks...

  16. Permanent magnet energy conversion machine with magnet mounting arrangement

    DOE Patents [OSTI]

    Hsu, John S.; Adams, Donald J.

    1999-01-01

    A hybrid permanent magnet dc motor includes three sets of permanent magnets supported by the rotor and three sets of corresponding stators fastened to the surrounding frame. One set of magnets operates across a radial gap with a surrounding radial gap stator, and the other two sets of magnets operate off the respective ends of the rotor across respective axial gaps.

  17. Apparatus tube configuration and mounting for solid oxide fuel cells

    DOE Patents [OSTI]

    Zymboly, Gregory E. (Murrysville, PA)

    1993-01-01

    A generator apparatus (10) is made containing long, hollow, tubular, fuel cells containing an inner air electrode (64), an outer fuel electrode (56), and solid electrolyte (54) therebetween, placed between a fuel distribution board (29) and a board (32) which separates the combustion chamber (16) from the generating chamber (14), where each fuel cell has an insertable open end and in insertable, plugged, closed end (44), the plugged end being inserted into the fuel distribution board (29) and the open end being inserted through the separator board (32) where the plug (60) is completely within the fuel distribution board (29).

  18. Pioneering the New Grid: Pole-mounted Solar

    Broader source: Energy.gov [DOE]

    Innovative new systems not only generate energy through a solar panel that feeds into the grid, but they are also equipped with communications capabilities.

  19. Mount Princeton Hot Springs Pool & Spa Low Temperature Geothermal...

    Open Energy Info (EERE)

    ,"icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map Temperature 56.0 C 132.0 F Flow 175 gpm 663 Lmin Capacity 0.40x106 Btuhr 0.100 MWt Annual Generation...

  20. Electric And Electromagnetic Outline Of The Mount Somma-Vesuvius...

    Open Energy Info (EERE)

    again a conductive zone, not only including the whole Somma caldera but also extending towards the Tyrrhenian sea. A roughly N-S-trending narrow fracture system, cutting the...

  1. Purchasing Energy-Efficient Ceiling-Mounted Fluorescent Luminaires...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Required Model Less Efficient Light Output 4,300 lm 4,300 lm 4,300 lm Luminaire Efficacy Rating (LER) 104 lmW 89 lmW 77 lmW Input Power 41 W 48 W 56 W Annual Energy Use 148 ...

  2. Energy Department Recognizes City of Roanoke, VA for Leadership in Better Buildings Challenge

    Broader source: Energy.gov [DOE]

    As part of the Obama Administration’s effort to cut energy waste in the nation’s buildings, the Energy Department today recognized the city of Roanoke, Virginia for its leadership.

  3. Contract Connections @ ChallengeHER – Norfolk, VA, October 14, 2014

    Broader source: Energy.gov [DOE]

    The U.S. Small Business Administration (SBA), Women Impacting Public Policy (WIPP), and American Express OPEN have partnered to host this special FREE contracting event for women business owners....

  4. Climate Action Champions: Metropolitan Washington Council of Governments, DC, MD, and VA

    Broader source: Energy.gov [DOE]

    The Metropolitan Washington Council of Governments (COG) and its member governments are pioneering efforts to address and prepare for climate change and are recognized leaders in that regard. In 2008, the COG Board of Directors adopted the National Capital Region Climate Change Report as a regional policy. The report includes a baseline regional greenhouse gas inventory, examines potential climate change impacts, evaluates mitigation and adaptation strategies, and establishes greenhouse gas emission reduction goals of 20 percent by 2020, and 80 percent by 2050 as compared to a 2005 baseline.

  5. What Will Be This Year’s vA3C?

    Broader source: Energy.gov [DOE]

    The AEC Technology Symposium and Hackathon brings together software developers that work in and around the architecture, engineering, and construction (AEC) industries to learn about the latest technologies and to use them to prototype new products in a 30-hour caffeine-fueled grand finale.

  6. File:EIA-Appalach6-WV-VA-GAS.pdf | Open Energy Information

    Open Energy Info (EERE)

    Southern West Virginia and Southwestern Virginia By 2001 Gas Reserve Class Sources Energy Information Administration Authors Samuel H. Limerick; Lucy Luo; Gary Long; David F....

  7. File:EIA-Appalach6-WV-VA-BOE.pdf | Open Energy Information

    Open Energy Info (EERE)

    Samuel H. Limerick; Lucy Luo; Gary Long; David F. Morehouse; Jack Perrin; Robert F. King Related Technologies Oil, Natural Gas Creation Date 2005-09-01 Extent Regional...

  8. File:EIA-Appalach6-WV-VA-LIQ.pdf | Open Energy Information

    Open Energy Info (EERE)

    Samuel H. Limerick; Lucy Luo; Gary Long; David F. Morehouse; Jack Perrin; Robert F. King Related Technologies Oil, Natural Gas Creation Date 2005-09-01 Extent Regional...

  9. Microsoft Word - DM_VA-#126832-v3-Smart_Grid_Comments_--_DOE...

    Energy Savers [EERE]

    ... demand among consumers for Smart Grid applications like time-of-use pricing or demand-response programs. 3 In light of this reality, policymakers, industry, and other ...

  10. If you reside in WASHINGTON, DC - MD -VA - WV your salary will...

    National Nuclear Security Administration (NNSA)

    Minimum Maximum Developmental EN 53,579 81,460 01 EKEJ 37,073 63,660 02 EKEJ 56,172 92,321 03 EKEJEN 81,460 129,729 04 EKEJEN 114,468 165,300 05 EKEJEN...

  11. DOE Zero Energy Ready Home Case Study: Promethean Homes — Gross-Shepard Residence, Charlottesville, VA

    SciTech Connect (OSTI)

    none,

    2014-09-01

    This is the first DOE Zero Energy Ready Home for this builder, who earned a Custom Builder honor in the 2014 Housing Innovation Awards. The home included rigid mineral wool board insulation over house wrap and plywood on the 2x6 advanced framed walls, achieving HERS 33 without PV.

  12. Buildings Energy Data Book: 3.9 Educational Facilities

    Buildings Energy Data Book [EERE]

    6 2010 Regional New Construction and Renovations Expenditures for Public K-12 Schools ($Million) Region New Schools Additions Renovation Total Region 1 (CT, MA, ME, NH, RI, VT) Region 2 (NJ, NY, PA) Region 3 (DE, MD, VA, WV) Region 4 (KY, NC, SC, TN) Region 5 (AL, FL, GA, MS) Region 6 (IN, MI, OH) Region 7 (IL, MN, WI) Region 8 (IA, KS, MO, NE) Region 9 (AR, LA, OK, TX) Region 10 (CO, MT, ND, NM, SD, UT, WY) Region 11 (AZ, CA, HI, NV) Region 12 (AK, ID, OR, WA) Total Source(s): School Planning

  13. Print

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    < 5k 0 < 50k < 100k < 250k < 500k < 1M > 1M > 5M > 10M DE MD DC MA RI NJ AZ UT WY ID OR WA CA TX OK KS CO NE SD ND MN WI IL IA MO AR LA MS AL FL GA TN KY IN OH MI ME NH CT VT NY PA WV VA NC SC MT AK HI NV NM Princeton Plasma Physics Laboratory Procured Materials and Services 2015 (> $35M) Small business procurements in US: $14.73M

  14. Annual Energy Outlook 2015 - Appendix B

    Gasoline and Diesel Fuel Update (EIA)

    5 U.S. Energy Information Administration | Annual Energy Outlook 2015 Regional maps Figure F4. Oil and gas supply model regions F-5 U.S. Energy Information Administration | Annual Energy Outlook 2014 Regional maps Figure F4. Oil and gas supply model regions Figure F4. Oil and Gas Supply Model Regions Atlantic WA MT WY ID NV UT CO AZ NM OK IA KS MO IL IN KY TN MS AL FL GA SC NC WV PA NJ MD DE NY CT ME RI MA NH VA WI MI OH NE SD MN ND AR OR CA VT East (1) Gulf of Mexico LA Gulf Coast (2)

  15. Annual Energy Outlook 2015 - Appendix F

    Gasoline and Diesel Fuel Update (EIA)

    7 U.S. Energy Information Administration | Annual Energy Outlook 2015 Regional maps Figure F6. Coal supply regions WA ID OR CA NV UT TX OK AR MO LA MS AL GA FL TN SC NC KY VA WV WY CO SD ND MI MN WI IL IN OH MD PA NJ DE CT MA NH VT NY ME RI MT NE IA KS MI AZ NM 500 0 SCALE IN MILES APPALACHIA Northern Appalachia Central Appalachia Southern Appalachia INTERIOR NORTHERN GREAT PLAINS Eastern Interior Western Interior Gulf Lignite Dakota Lignite Western Montana Wyoming, Northern Powder River Basin

  16. DOE Zero Energy Ready Home Case Study: Caldwell and Johnson — Church Community and Housing Corporation, Charlestown, RI

    SciTech Connect (OSTI)

    none,

    2014-09-01

    This DOE Zero Energy Ready Home garnered an Affordable Builder award in the 2014 Housing Innovation Awards, for its highly insulated construction, minisplit heat pump and water heater, and triple pane windows.

  17. OAiC RiDGE NATIONAL LABORAl-ORY LKCKKBSP HAITI MANA%ED AND OPERATED...

    Office of Legacy Management (LM)

    ... The reliability of the field screening method was established at another site by comparison of the field-estimated uranium concentration in a specific sample to the results found ...

  18. A=13C (70AJ04)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    70AJ04) (See Energy Level Diagrams for 13C) GENERAL: See Table 13.4 [Table of Energy Levels] (in PDF or PS). Model calculations:(BR59M, PH60A, TA60L, ZE60, BA61L, BA61N, KU61A, KU61E, NE61C, EA62, BO63J, MA63S, PE63A, SE63N, TR63, AM64, NA64A, ST64, CO65I, MA65O, ME65B, NE65, WE65D, EL66B, GU66D, HA66F, MA66S, NO66, RI66F, WI66E, BA67JJ, CO67M, FA67A, HU67C, KU67J, PO67G, RI67J, WA67I, FI68, HO68, RE68G, KU69C, VA69, KU70). Other:(BA62P, LI64I, BO65E, HE66D, OL66B, RI68I, TA68W, WI68B, AL69A,

  19. Microsoft Word - DM_VA-#126832-v3-Smart_Grid_Comments_--_DOE_--_Policy_and_Logistical_Challenges.DOC

    Energy Savers [EERE]

    Before the UNITED STATES DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability In the matter of: Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation 75 FR 57006 COMMENTS OF VERIZON AND VERIZON WIRELESS Michael Glover Of Counsel Edward Shakin William H. Johnson VERIZON 1320 North Courthouse Road Ninth Floor Arlington, Virginia 22201 (703) 351-3060 John T. Scott, III William D. Wallace VERIZON WIRELESS 1300 I Street N.W. Suite 400 West

  20. A Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo...

    Open Energy Info (EERE)

    flows; a post-eruption aftermath of rain-triggered lahars in surrounding drainages and dome-building that fills the caldera; and then another long quiescent period. During and...

  1. Control of Surface Mounted Permanent Magnet Motors with Special Application to Fractional-Slot Concentrated Windings

    SciTech Connect (OSTI)

    Lawler, J.S.

    2005-12-21

    It is well known that the ability of the permanent magnet synchronous machine (PMSM) to operate over a wide constant power speed range (CPSR) is dependent upon the machine inductance [1,2,3,4,5]. Early approaches for extending CPSR operation included adding supplementary inductance in series with the motor [1] and the use of anti-parallel thyristor pairs in series with the motor-phase windings [5]. The increased inductance method is compatible with a voltage-source inverter (VSI) controlled by pulse-width modulation (PWM) which is called the conventional phase advance (CPA) method. The thyristor method has been called the dual mode inverter control (DMIC). Neither of these techniques has met with wide acceptance since they both add cost to the drive system and have not been shown to have an attractive cost/benefit ratio. Recently a method has been developed to use fractional-slot concentrated windings to significantly increase the machine inductance [6]. This latest approach has the potential to make the PMSM compatible with CPA without supplemental external inductance. If the performance of such drive is acceptable, then the method may make the PMSM an attractive option for traction applications requiring a wide CPSR. A 30 pole, 6 kW, 6000 maximum revolutions per minute (rpm) prototype of the fractional-slot PMSM design has been developed [7]. This machine has significantly more inductance than is typical of regular PMSMs. The prototype is to be delivered in late 2005 to the Oak Ridge National Laboratory (ORNL) for testing and development of a suitable controller. In advance of the test/control development effort, ORNL has used the PMSM models developed over a number of previous studies to study the steady-state performance of high-inductance PMSM machines with a view towards control issues. The detailed steady-state model developed includes all motor and inverter-loss mechanisms and will be useful in assessing the performance of the dynamic controller to be developed in future work. This report documents the results of this preliminary investigation.

  2. Sampling and analysis plan for Mount Plant D & D soils packages, Revision 1

    SciTech Connect (OSTI)

    1991-02-01

    There are currently 682 containers of soils in storage at Mound Plant, generated between April 1 and October 31, 1990 as a result of excavation of soils containing plutonium-238 at two ongoing Decontamination and Decommissioning (D&D) Program sites. These areas are known as Area 14, the waste transfer system (WTS) hillside, and Area 17, the Special Metallurgical (SM) Building area. The soils from these areas are part of Mound Plant waste stream number AMDM-000000010, Contaminated Soil, and are proposed for shipment to the Nevada Test Site (NTS) for disposal as low-level radioactive waste. The sealed waste packages, constructed of either wood or metal, are currently being stored in Building 31 and at other locations throughout the Mound facility. At a meeting in Las Vegas, Nevada on October, 26, 1990, DOE Nevada Operations Office (DOE-NV) and NTS representatives requested that the Mound Plant D&D soils proposed for shipment to NTS be sampled for Toxicity Characteristic Leaching Procedure (TCLP) constituents. On December 14, 1990, DOE-NV also requested that additional analyses be performed on the soils from one of the soils boxes for polychlorinated biphenyls (PCBs), particle size distribution, and free liquids. The purpose of this plan is to document the proposed sampling and analyses of the packages of D&D soils produced prior to October 31, 1990. In order to provide a thorough description of the soils excavated from the WTS and SM areas, sections 1.1 and 1.2 provide historical Information concerning the D&D soils, including waste stream evaluations and past sampling data.

  3. NedPower Mount Storm II Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Shell Wind EnergyDominion Energy Developer NedPowerShell Wind EnergyDominion Energy...

  4. Method of mounting a fuel pellet in a laser-excited fusion reactor

    DOE Patents [OSTI]

    Hirsch, Robert L.

    1979-01-01

    Laser irradiation means for irradiating a target, wherein a single laser light beam from a source and a mirror close to the target are used with aperture means for directing laser light to interact with the target over a broad area of the surface, and for protecting the laser light source.

  5. Mixed convection heat transfer from thermal sources mounted on horizontal and vertical surfaces

    SciTech Connect (OSTI)

    Tewari, S.S.; Jaluria, Y. )

    1990-11-01

    An experimental study is carried out on the fundamental aspects of the conjugate, mixed convective heat transfer from two finite width heat sources, which are of negligible thickness, have a uniform heat flux input at the surface, and are located on a flat plate in a horizontal or the vertical orientation. The heat sources are wide in the transverse direction and, therefore, a two-dimensional flow circumstance is simulated. The mixed convection parameter is varied over a fairly wide range to include the buoyancy-dominated and the mixed convection regimes. The circumstances of pure natural convection are also investigated. The convective mechanisms have been studied in detail by measuring the surface temperatures and determining the heat transfer coefficients for the two heated strips, which represent isolated thermal sources. Experimental results indicate that a stronger upstream heat source causes an increase in the surface temperature of a relatively weaker heat source, located downstream, by reducing it convective heat transfer coefficient. The influence of the upstream source is found to be strongly dependent on the surface orientation, especially in the pure natural convection and the buoyancy dominated regimes. The two heat sources are found to be essentially independent on the surface orientation, especially in the pure natural convection and the buoyancy dominated regimes. The two heat sources are found to be essentially independent of each other, in terms of thermal effects, at a separation distance of more than about three strip widths for both the orientations. The results obtained are relevant to many engineering applications, such as the cooling of electronic systems, positioning of heating elements in furnaces, and safety considerations in enclosure fires.

  6. Near-Surface imaging of a hydrogeothermal system at Mount Princeton...

    Open Energy Info (EERE)

    3D seismic, self-potential, and dc resistivity data Authors A.P. Lamb, L.M. Liberty, K. van Wijk, A. Revil and C. Diggins Published Journal Society of Exploration...

  7. Ventilation efficiencies and thermal comfort results of a desk-edge-mounted task ventilation system

    SciTech Connect (OSTI)

    Faulkner, D.; Fisk, W.J.; Sullivan, D.P.; Lee, S.M.

    2003-09-01

    In chamber experiments, we investigated the ventilation effectiveness and thermal comfort of a task ventilation system with an air supply nozzle located underneath the front edge of a desk and directing air toward a heated mannequin or a human volunteer seated at the desk. The task ventilation system provided outside air, while another ventilation system provided additional space cooling but no outside air. Test variables included the vertical angle of air supply (-15{sup o} to 45{sup o} from horizontal), and the supply flow rate of (3.5 to 6.5 L s{sup -1}). Using the tracer gas step-up and step-down procedures, the measured air change effectiveness (i.e., exhaust air age divided by age of air in the breathing zone) in experiments with the mannequin ranged from 1.4 to 2.7 (median, 1.8), whereas with human subjects the air change effectiveness ranged from 1.3 to 2.3 (median, 1.6). The majority of the air change effectiveness values with the human subjects were less than values with the mannequin at comparable tests. Similarly, the tests run with supply air temperature equal to the room air temperature had lower air change effectiveness values than comparable tests with the supply air temperature lower ({approx}5 C) than the room air temperature. The air change effectiveness values are higher than typically reported for commercially available task ventilation or displacement ventilation systems. Based on surveys completed by the subjects, operation of the task ventilation system did not cause thermal discomfort.

  8. Ventilation efficiencies of a desk-edge-mounted task ventilation system

    SciTech Connect (OSTI)

    Faulkner, David; Fisk, William J.; Sullivan, Douglas P.; Lee, Seung Min

    2002-03-01

    In chamber experiments, we investigated the effectiveness of a task ventilation system with an air supply nozzle located underneath the front edge of a desk and directing air toward a heated mannequin seated at the desk. The task ventilation system provided outside air, while another ventilation system provided additional space cooling but no outside air. Test variables included the vertical angle of air supply (-15{sup o} to 45{sup o} from horizontal), and the supply flow rate of (3.5 to 6.5 L s{sup -1}). Using the tracer gas step-up and step-down procedures, the measured air change effectiveness (i.e., exhaust air age divided by age of air at the mannequin's face) ranged from 1.4 to 2.7, which is higher than typically reported for commercially available task ventilation or displacement ventilation systems.

  9. Pattern of shallow ground water flow at Mount Princeton Hot Springs...

    Open Energy Info (EERE)

    Mt. Princeton hot water production (4.3-4.9)103m3day at approximately 60-86C). A temperature map indicates that a third upwelling zone termed U4 may exist at the southern...

  10. Pattern Of Shallow Ground Water Flow At Mount Princeton Hot Springs...

    Open Energy Info (EERE)

    Mt. Princeton hot water production (4.3-4.9) 103 m3day at approximately 60-86C). A temperature map indicates that a third upwelling zone termed U4 may exist at the southern...

  11. Table 26. Natural gas home customer-weighted heating degree days

    U.S. Energy Information Administration (EIA) Indexed Site

    96 Created on: 4/26/2016 6:14:01 PM Table 26. Natural gas home customer-weighted heating degree days Month/Year/Type of data New England Middle Atlantic East North Central West North Central South Atlantic CT, ME, MA, NH, RI, VT NJ, NY, PA IL, IN, MI, OH, WI IA, KS, MN, MO, ND, NE, SD DE, FL, GA, MD, DC, NC, SC, VA, WV November Normal 702 665 757 841 443 2014 749 742 909 1,002 562 2015 583 509 596 653 325 % Diff (normal to 2015) -17.0 -23.5 -21.3 -22.4 -26.6 % Diff (2014 to 2015) -22.2 -31.4

  12. Word Pro - Untitled1

    U.S. Energy Information Administration (EIA) Indexed Site

    State-Level Energy Consumption Estimates and Estimated Consumption per Capita, 2010 Consumption Consumption per Capita 14 U.S. Energy Information Administration / Annual Energy Review 2011 TX CA FL LA IL OH PA NY GA IN MI NC VA NJ TN WA KY AL MO MN WI SC OK CO IA MD AZ MA MS KS AR OR NE UT CT WV NM NV AK WY ID ND ME MT SD NH HI DE RI DC VT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 0 2 4 6 8 10

  13. Microsoft Word - figure_99.doc

    U.S. Energy Information Administration (EIA) Indexed Site

    7 U.S. Energy Information Administration | Natural Gas Annual Figure 6. Natural gas processing in the United States and the Gulf of Mexico, 2014 (million cubic feet) None 1-15,000 15,001-100,000 100,001-200,000 200,001-500,000 500,001 and over Sources: Energy Information Administration (EIA), Form EIA-64A, "Annual Report of the Origin of Natural Gas Liquids Production." IN OH TN WV VA KY MD PA NY VT NH MA CT ME RI DE DC NC SC GA FL NJ AL MS LA MO AR TX NM OK CO KS UT AZ WY NE IL IA MN

  14. pr_a.indd

    Gasoline and Diesel Fuel Update (EIA)

    FL PADD 4: Rocky Mountain PADD 5: West Coast PADD 2: Midwest PADD 1: East Coast PADD 3: Gulf Coast PADD1A: New England PADD1B: Central Atlantic PADD1C: Lower Atlantic Petroleum Administration for Defense Districts AK HI WA OR CA NV AZ MT WY CO UT ID ND SD NE KS OK MO MN WI MI IL IN OH KY TN IA NM TX AR LA AL MS WV VA NC SC GA FL ME NH VT NY PA NJ MD DE MA CT RI

    9 A P P E N D I X A This appendix contains alphabetical listings of the variables used in the price and expenditure module of the

  15. A=15C (1986AJ01)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6AJ01) (See Energy Level Diagrams for 15C) GENERAL: See also (1981AJ01) and Table 15.1 [Table of Energy Levels] (in PDF or PS) here. Model calculations:(1983ANZQ, 1984VA06). Electromagnetic transitions:(1980RI06). Complex reactions involving 15C:(1981GR08, 1983BE02, 1983EN04, 1983FR1A, 1983HO08, 1983MA06, 1983OL1A, 1983WI1A, 1984HI1A, 1984HO23). Pion capture and reactions:(1981OS04). Hypernuclei:(1981WA1J, 1982KA1D, 1983DO1B, 1983FE07, 1983KO1V, 1984AS1D). Other topics:(1984PO11). Ground state

  16. A=15C (1991AJ01)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    91AJ01) (See Energy Level Diagrams for 15C) GENERAL: See also (1986AJ01) and Table Prev. Table 15.1 preview 15.1 [Table of Energy Levels] (in PDF or PS) here. Model calculations:(1988MI1J, 1989PO1K, 1989WO1E). Electromagnetic transitions:(1984VA06). Astrophysical questions:(1989KA1K). Complex reactions involving 15C:(1985PO11, 1986AV1B, 1986BI1A, 1986DU11, 1986HA1P, 1986HA1B, 1986PO06, 1987RI03, 1987SA25, 1987SN01, 1987VI02, 1988CA06, 1988JO1B, 1988MI28, 1988RU01, 1988SA19, 1989AS1B, 1989OG1B,

  17. Annual Energy Outlook 2015 - Appendix F

    Gasoline and Diesel Fuel Update (EIA)

    8 Regional maps Figure F7. Coal demand regions Figure F7. Coal Demand Regions CT,MA,ME,NH,RI,VT OH 1. NE 3. S1 4. S2 5. GF 6. OH 7. EN AL,MS MN,ND,SD IA,NE,MO,KS TX,LA,OK,AR MT,WY,ID CO,UT,NV AZ,NM 9. AM 11. C2 12. WS 13. MT 14. CU 15. ZN WV,MD,DC,DE 2. YP Region Content Region Code NY,PA,NJ VA,NC,SC GA,FL IN,IL,MI,WI Region Content Region Code 14. CU 13. MT 16. PC 15. ZN 12. WS 11. C2 9. AM 5. GF 8. KT 4. S2 7. EN 6. OH 2. YP 1. NE 3. S1 10. C1 KY,TN 8. KT 16. PC AK,HI,WA,OR,CA 10. C1

  18. QROU Questions Fax: Fax transmits questions on the Quarry Residuals Operable Unit - Remedial Investigation Report (QROU - RI) for technical meeting set for August 14, 1997.

    Office of Legacy Management (LM)

  19. Work Plan: Work Plan for the Remedial Investigation/Feasibility Study - Environmental Assessment (RI/FS-EA) for the Quarry Residuals Operable Unit at the Weldon Spring Site.

    Office of Legacy Management (LM)

  20. Quality control summary report for the RFI/RI assessment of the submerged sediment core samples taken at Par Pond, Pond C, and L-Lake

    SciTech Connect (OSTI)

    Koch, J. II

    1996-12-01

    This report presents a summary of the sediment characterization performed under the direction of the Westinghouse Savannah River Company`s (WSRC) Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) in support of Par Pond, Pond C, and L- Lake. This characterization will be a screening study and will enable the Environmental Sciences Section (ESS) to develop a defensible contaminants of concern list for more extensive characterization of the Par Pond, Pond C, and L-Lake.

  1. Superfund Record of Decision (EPA Region 3): Rhinehart Tire Fire Dump, Operable Unit 2, Winchester, VA. (Second remedial action), September 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-29

    The Rhinehart Tire Fire Dump site is located in a 22-acre drainage area of a sparsely populated rural area in western Frederick County, Virginia. Surface water runoff flows into a north-south tributary that discharges to Hogue Creek, which is 4,000 feet downstream. Bedrock is noted to be highly fractured, and the ground water flow in the overburden aquifer is toward Massey Run. From 1972 to 1983, the site owner conducted a tire disposal operation, which consisted of transporting discarded tires from various locations and storing them on a 5-acre wooded slope behind his home. An estimated 5 to 7 million tires that had been accumulated caught on fire in October 1983 and burned until July 1984. As a result of the fire, a free-flowing oily-tar, which contained anthracene, benzene, cadmium, chromium, ethylbenzene, napthalene, nickel, pyrene, toluene, and zinc, began to seep out of the tire pile into Massey Run and on to Hogue Creek.

  2. HCCI and Stratified-Charge CI Engine Combustion Research

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... CNL, DI-60 CNL, PFS CNL, PM RI, DI-60 RI, PFS RI, PM CA50 Sweeps at Constant Fueling P in 2.4 bar, PM, std. PFS, & Early -DI Adapted Matlab code for combustion noise level ...

  3. Building America Case Study: Advanced Extended Plate and Beam Wall System in a Cold-Climate House, Mount Joy, Pennsylvania

    SciTech Connect (OSTI)

    2016-01-01

    This report presents the design and evaluation of a innovative wall system. This highly insulated (high-R) light-frame wall system for use above grade in residential buildings is referred to as Extended Plate & Beam (EP&B). The EP&B design is the first of its kind to be featured in a new construction test house (NCTH) for the DOE Building America program. The EP&B wall design integrates standard building methods and common building products to construct a high-R wall that minimizes transition risks and costs to builders. The EP&B design combines optimized framing with integrated rigid foam sheathing to increase the wall system's R-value and reduce thermal bridging. The foam sheathing is installed between the wall studs and structural wood sheathing. The exterior wood sheathing is attached directly to a framing extension formed by extended top and bottom plates. The exterior wood sheathing can dry to the exterior and provides bracing, a clear drainage plane and flashing surface for window and door openings, and a nailing surface for siding attachment. With support of the DOE Building America program, Home Innovation Research Labs partnered with Lancaster County Career and Technology Center (LCCTC) to build a NCTH in Lancaster, PA to demonstrate the EP&B wall design in a cold climate (IECC climate zone 5A). The results of the study confirmed the benefits of the systems and the viability of its integration into the house construction process.

  4. Petrologic and petrophysical evaluation of the Dallas Center Structure, Iowa, for compressed air energy storage in the Mount Simon Sandstone.

    SciTech Connect (OSTI)

    Heath, Jason E.; Bauer, Stephen J.; Broome, Scott Thomas; Dewers, Thomas A.; Rodriguez, Mark Andrew

    2013-03-01

    The Iowa Stored Energy Plant Agency selected a geologic structure at Dallas Center, Iowa, for evaluation of subsurface compressed air energy storage. The site was rejected due to lower-than-expected and heterogeneous permeability of the target reservoir, lower-than-desired porosity, and small reservoir volume. In an initial feasibility study, permeability and porosity distributions of flow units for the nearby Redfield gas storage field were applied as analogue values for numerical modeling of the Dallas Center Structure. These reservoir data, coupled with an optimistic reservoir volume, produced favorable results. However, it was determined that the Dallas Center Structure cannot be simplified to four zones of high, uniform permeabilities. Updated modeling using field and core data for the site provided unfavorable results for air fill-up. This report presents Sandia National Laboratories' petrologic and petrophysical analysis of the Dallas Center Structure that aids in understanding why the site was not suitable for gas storage.

  5. Independent wheel suspension system using constant velocity universal joints in combination with a single prop shaft joint and mounted differentials

    SciTech Connect (OSTI)

    Krude, W.

    1986-06-24

    An independent wheel suspension system is described for a vehicle having a chassis, vehicle support means for resiliently supporting the chassis for displacement with respect to a driving surface, a wheel assembly with a wheel rotatable about a wheel axis, and an engine adapted to provide driving torque about an engine output axis at an engine output, the independent wheel suspension system consists of: control arm means having a wheel end pivotably connected to the wheel assembly and a pair of frame ends pivotably connected to a respective pair of pivot bearings carried by the vehicle support means to define a swing axis therethrough; differential means comprising a differential housing, differential input means and differential output means within the differential housing establishing a respective differential input axis and a differential output axis substantially perpendicular thereto; transverse pivot means coupling the differential means and the vehicle support means for allowing the differential means to pivot relative to the vehicle support means about a transverse pivot axis substantially parallel to the differential output axis; and prop shaft means having a prop shaft axis and first and second prop shaft coupling means coupling, respectively, to the engine output and the differential input, the first prop shaft coupling means being a constant velocity universal joint, the second prop shaft coupling means being one of an axially splined joint or a fixed joint; whereby, as the first prop shaft coupling means undergoes articulation with respect to the prop shaft means as the chassis undergoes the displacement, the transverse pivot means allows the differential means to pivot relative to the vehicle support means about the transverse pivot axis to accommodate the articulation without articulation between the differential means and the prop shaft means.

  6. 2012 SINGLE MOLECULE APPROACHES TO BIOLOGY GORDON RESEARCH CONFERENCE (JULY 15-20, 2012 - MOUNT SNOW RESORT, WEST DOVER VT)

    SciTech Connect (OSTI)

    Fernandez, Julio [Columbia University

    2012-04-20

    Single molecule techniques are rapidly occupying a central role in biological research at all levels. This transition was made possible by the availability and dissemination of robust techniques that use fluorescence and force probes to track the conformation of molecules one at a time, in vitro as well as in live cells. Single-molecule approaches have changed the way many biological problems are studied. These novel techniques provide previously unobtainable data on fundamental biochemical processes that are essential for all forms of life. The ability of single-molecule approaches to avoid ensemble averaging and to capture transient intermediates and heterogeneous behavior renders them particularly powerful in elucidating mechanisms of the molecular systems that underpin the functioning of living cells. Hence, our conference seeks to disseminate the implementation and use of single molecule techniques in the pursuit of new biological knowledge. Topics covered include: Molecular Motors on the Move; Origin And Fate Of Proteins; Physical Principles Of Life; Molecules and Super-resolution Microscopy; Nanoswitches In Action; Active Motion Or Random Diffusion?; Building Blocks Of Living Cells; From Molecular Mechanics To Physiology; Tug-of-war: Force Spectroscopy Of Single Proteins.

  7. Determination of gene expression patterns using high-throughput RNA in situ hybridizaion to whole-mount Drosophila embryos

    SciTech Connect (OSTI)

    Weiszmann, R.; Hammonds, A.S.; Celniker, S.E.

    2009-04-09

    We describe a high-throughput protocol for RNA in situ hybridization (ISH) to Drosophila embryos in a 96-well format. cDNA or genomic DNA templates are amplified by PCR and then digoxigenin-labeled ribonucleotides are incorporated into antisense RNA probes by in vitro transcription. The quality of each probe is evaluated before ISH using a RNA probe quantification (dot blot) assay. RNA probes are hybridized to fixed, mixed-staged Drosophila embryos in 96-well plates. The resulting stained embryos can be examined and photographed immediately or stored at 4oC for later analysis. Starting with fixed, staged embryos, the protocol takes 6 d from probe template production through hybridization. Preparation of fixed embryos requires a minimum of 2 weeks to collect embryos representing all stages. The method has been used to determine the expression patterns of over 6,000 genes throughout embryogenesis.

  8. Process for mounting a protection diode on a vertical multijunction photovoltaic cell structure and photovoltaic cells obtained

    SciTech Connect (OSTI)

    Arnould, J.

    1982-09-07

    In a stack of diodes forming a vertical multijunction photovoltaic cell, an inversely connected diode is firmly secured to this stack with possible insertion of a intermediate wafer made from a conducting material.

  9. 2011 Quantum Control of Light & Matter Gordon Research Conference (July 31-August 5, 2011, Mount Holyoke College, South Hadley, MA)

    SciTech Connect (OSTI)

    Thomas Weinacht

    2011-08-05

    Quantum control of light and matter is the quest to steer a physical process to a desirable outcome, employing constructive and destructive interference. Three basic questions address feasibility of quantum control: (1) The problem of controllability, does a control field exist for a preset initial and target state; (2) Synthesis, constructively finding the field that leads to the target; and (3) Optimal Control Theory - optimizing the field that carries out this task. These continue to be the fundamental theoretical questions to be addressed in the conference. How to realize control fields in the laboratory is an ongoing challenge. This task is very diverse viewing the emergence of control scenarios ranging from attoseconds to microseconds. How do the experimental observations reflect on the theoretical framework? The typical arena of quantum control is an open environment where much of the control is indirect. How are control scenarios realized in dissipative open systems? Can new control opportunities emerge? Can one null decoherence effects? An ideal setting for control is ultracold matter. The initial and final state can be defined more precisely. Coherent control unifies many fields of physical science. A lesson learned in one field can reflect on another. Currently quantum information processing has emerged as a primary target of control where the key issue is controlling quantum gate operation. Modern nonlinear spectroscopy has emerged as another primary field. The challenge is to unravel the dynamics of molecular systems undergoing strong interactions with the environment. Quantum optics where non-classical fields are to be generated and employed. Finally, coherent control is the basis for quantum engineering. These issues will be under the limelight of the Gordon conference on Quantum Control of Light and Matter.

  10. Control of Surface Mounted Permanent Magnet Motors with Special Application to Fractional-Slot Motors with Concentrated Windings

    SciTech Connect (OSTI)

    McKeever, John W; Patil, Niranjan; Lawler, Jack

    2007-07-01

    A 30 pole, 6 kW, and 6000 maximum revolutions per minute (rpm) prototype of the permanent magnet synchronous motor (PMSM) with fractional-slot concentrated windings (FSCW) has been designed, built, and tested at the University of Wisconsin at Madison (UWM). This machine has significantly more inductance than that of regular PMSMs. The prototype was delivered in April 2006 to the Oak Ridge National Laboratory (ORNL) for testing and development of a controller that will achieve maximum efficiency. In advance of the test/control development effort, ORNL has used the PMSM models developed over a number of previous studies to study how steady state performance of high inductance PMSM machines relates to control issues. This report documents the results of this research. The amount of inductance that enables the motor to achieve infinite constant power speed ratio (CPSR) is given by L{sub {infinity}} = E{sub b}/{Omega}{sub b}I{sub R}, where E{sub b} is the root-mean square (rms) magnitude of the line-to-neutral back-electromotive force (emf) at base speed, {Omega}{sub b} is the base speed in electrical radians per second, and I{sub R} is the rms current rating of the motor windings. The prototype machine that was delivered to ORNL has about 1.5 times as much inductance as a typical PMSM with distributed integral slot windings. The inventors of the FSCW method, who designed the prototype machine, remarked that they were 'too successful' in incorporating inductance into their machine and that steps would be taken to modify the design methodology to reduce the inductance to the optimum value. This study shows a significant advantage of having the higher inductance rather than the optimal value because it enables the motor to develop the required power at lower current thereby reducing motor and inverter losses and improving efficiency. The main problem found with high inductance machines driven by a conventional phase advance (CPA) method is that the motor current at high speed depends solely on machine parameters and is virtually independent of the load level and the direct current (dc) supply voltage. Thus, the motor current is virtually the same at no load as at full load resulting in poor efficiency at less than full load conditions. While an inductance higher than the value cited above is warranted, it still does not ensure that the motor current is proportional to load; consequently, the problem of low efficiency at high speed and partial load is not resolved but is only mitigated. A common definition of 'base speed' is the speed at which the voltage applied to the motor armature is equal to the magnitude of the back-emf. The results in this study indicate that the dc supply voltage should be adequate to drive rated current into the motor winding at the specified base speed. At a minimum this requires sufficient voltage to overcome not only the back-emf but also the voltage drop across the internal impedance of the machine. For a high inductance PMSM, the internal impedance at base speed can be considerable and substantial additional voltage is required to overcome the internal voltage drop. It is further shown that even more voltage than the minimum required for injecting rated current at base speed can be beneficial by allowing the required power to be developed at lower current, which reduces losses in the motor and inverter components. Further, it is shown that the current is minimized at a unique speed; consequently, there may be room for optimization if the drive spends a substantial amount of its operating life at a certain speed (for example 60 mph). In this study, fundamental frequency phasor models are developed for a synchronous PMSM and the control systems that drive them is CPA. The models were compared with detailed simulations to show their validity. The result was used to design a traction drive control system with optimized efficiency to drive the fractional-slot motor with concentrated windings. The goal is to meet or exceed the FreedomCAR inverter cost and performance targets.

  11. Contol of Surface Mounted Permanent Magnet Motors with Special Application to Motors with Fractional-Slot Concentrated Windings

    SciTech Connect (OSTI)

    Patil, N.; Lawler, J.S.; McKeever, J.

    2007-07-31

    A 30-pole, 6-kW prototype of a fractional-slot permanent magnet synchronous motor (PMSM) design has been developed to operate at a maximum speed of 6000 rpm [1,2]. This machine has significantly more inductance than regular PMSMs with distributed windings. The prototype was delivered in April 2006 to the Oak Ridge National Laboratory (ORNL) for testing and development of a suitable controller. To prepare for this test/control development effort, ORNL used PMSM models developed over a number of previous studies to preview the control issues that arise when a dynamic controller drives a high inductance PMSM machine during steady state performance evaluations. The detailed steady state model developed includes all motor and inverter loss mechanisms and was useful for assessing the performance of the dynamic controller before it was put into operation. This report documents the results of tests demonstrating the effectiveness of ORNL's simple low-cost control scheme during characterization of the fractional-slot concentrated windings (FSCW) PMSM motor. The control scheme is simple because only the supply voltage magnitude and the phase angle between the back-electromotive force (emf) and the supply voltage is controlled. It is low-cost because it requires no current or phase voltage sensors.

  12. Gas Production From a Cold, Stratigraphically Bounded Hydrate Deposit at the Mount Elbert Site, North Slope, Alaska

    SciTech Connect (OSTI)

    Moridis, G.J.; Silpngarmlert, S.; Reagan, M. T.; Collett, T.S.; Zhang, K.

    2009-09-01

    As part of an effort to identify suitable targets for a planned long-term field test, we investigate by means of numerical simulation the gas production potential from unit D, a stratigraphically bounded (Class 3) permafrost-associated hydrate occurrence penetrated in the ount Elbert well on North Slope, Alaska. This shallow, low-pressure deposit has high porosities, high intrinsic permeabilities and high hydrate saturations. It has a low temperature because of its proximity to the overlying permafrost. The simulation results indicate that vertical ells operating at a constant bottomhole pressure would produce at very low rates for a very long period. Horizontal wells increase gas production by almost two orders of magnitude, but production remains low. Sensitivity analysis indicates that the initial deposit temperature is y the far the most important factor determining production performance (and the most effective criterion for target selection) because it controls the sensible heat available to fuel dissociation.

  13. Field Test Results of Using a Nacelle-Mounted Lidar for Improving Wind Energy Capture by Reducing Yaw Misalignment (Presentation)

    SciTech Connect (OSTI)

    Fleming, P.; Scholbrock, A.; Wright, A.

    2014-11-01

    Presented at the Nordic Wind Power Conference on November 5, 2014. This presentation describes field-test campaigns performed at the National Wind Technology Center in which lidar technology was used to improve the yaw alignment of the Controls Advanced Research Turbine (CART) 2 and CART3 wind turbines. The campaigns demonstrated that whether by learning a correction function to the nacelle vane, or by controlling yaw directly with the lidar signal, a significant improvement in power capture was demonstrated.

  14. Commercial-Scale Renewable-Energy Grants

    Broader source: Energy.gov [DOE]

    The Rhode Island Commerce Corporation (Commerce RI) seeks to fund commercial scale renewable energy projects to generate electricity for onsite consumption. Commerce RI provides incentives for...

  15. Tax Credits, Rebates & Savings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Income Residential Savings Category: Comprehensive MeasuresWhole Building Small-Scale Solar Grants (Commerce RI) Commerce RI provides incentives for renewable-energy projects....

  16. DOE - Office of Legacy Management -- Brown University - Metcalf...

    Office of Legacy Management (LM)

    Brown University - Metcalf Research Lab - RI 01 FUSRAP Considered Sites Site: Brown University (Metcalf Research Lab.) (RI.01 ) Eliminated from further consideration under FUSRAP...

  17. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    (Commerce RI) seeks to fund commercial scale renewable energy projects to generate electricity for onsite consumption. Commerce RI provides incentives for... Eligibility:...

  18. EV Community Readiness projects: New York City and Lower Hudson Valley Clean Communities, Inc. (NY, MA, PA); NYSERDA (ME, NH, VT, MA, RI, CT, NY, NJ, PA, DE, MD, DC)

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  19. DOE - Office of Legacy Management -- University of Virginia Physics...

    Office of Legacy Management (LM)

    Virginia Physics Dept - VA 03 FUSRAP Considered Sites Site: UNIVERSITY OF VIRGINIA, PHYSICS DEPT. (VA.03) Eliminated from further consideration under FUSRAP Designated Name: Not ...

  20. Metagenomic analysis of planktonic microbial consortia from a...

    Office of Scientific and Technical Information (OSTI)

    ... Environmental Epidemiology Div. Virginia Commonwealth Univ., Richmond, VA (United States). Dept. of Microbiology and Immunology Virginia Commonwealth Univ., Richmond, VA (United ...

  1. Building Energy Management Open-Source Software Development (BEMOSS)

    Broader source: Energy.gov [DOE]

    Lead Performer: Virginia Tech Advanced Research Institute - Alexandria, VA Project Partners: -- Arlington County, Virginia -- Danfoss Corporation - Baltimore, MD -- Virginia Tech Foundation - Blacksburg, VA

  2. DOE - Office of Legacy Management -- American Machine and Foundry...

    Office of Legacy Management (LM)

    1101 N. Royal Street , Alexandria , Virginia VA.06-3 Evaluation Year: 1987 VA.06-1 Site Operations: ResearchDevelopment activities associated with fuel element fabrication. ...

  3. DOE - Office of Legacy Management -- Reactor Site - Fort Belvoir...

    Office of Legacy Management (LM)

    VA.0-02-1 Site Disposition: Eliminated - Referred to DOD VA.0-02-1 Radioactive Materials Handled: Reactor fuel Primary Radioactive Materials Handled: Reactor Fuel Radiological ...

  4. Notice of Emergency Action- Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC: Federal Register Notice Volume 71, No. 13- Jan. 20, 2006

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01. Pursuant to 10 CFR 1021.343, the U.S. Department of Energy is issuing this Notice to document emergency actions that it has taken, and to set forth the steps it intends to take...

  5. Analysis of natural gases, AL, AR, FL, GA, IL, IN, IA, KY, LA, MD, MI, MS, MO, NJ, NY, NC, OH, PA, TN, VA, and WV; 1951-1991 (for microcomputers). Data file

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The U.S. Bureau of Mines diskette contains analysis and related source data for 2,357 natural gas samples collected from miscellaneous states, which include the following states: Alabama, Arkansas (except Arkoma Basin), Florida, Georgia, Illinois, Indiana, Iowa, Kentucky, Louisiana, Maryland, Michigan, Mississippi, Missouri, New Jersey, New York, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, and West Virginia. All samples were obtained and analyzed as part of the Bureau's investigations of occurrences of helium in natural gases of countries with free market economies. The survey has been conducted since 1917. The analysis contained on the diskette contain the full range of component analysis data. Five files are on the diskette: READ.ME, MISC.TXT, MISC.DBF, USHEANAL.DBF, and BASINCDE.TXT.

  6. Conceptual Design of a Simplified Skid-Mounted Caustic-Side Solvent Extraction Process for Removal of Cesium from Savannah Rive Site High-Level Waste

    SciTech Connect (OSTI)

    Birdwell, JR.J.F.

    2004-05-12

    This report presents the results of a conceptual design of a solvent extraction process for the selective removal of {sup 137}Cs from high-level radioactive waste currently stored in underground tanks at the U.S. Department of Energy's Savannah River Site (SRS). This study establishes the need for and feasibility of deploying a simplified version of the Caustic-Side Solvent Extraction (CSSX) process; cost/benefit ratios ranging from 33 to 55 strongly support the considered deployment. Based on projected compositions, 18 million gallons of dissolved salt cake waste has been identified as having {sup 137}Cs concentrations that are substantially lower than the worst-case design basis for the CSSX system that is to be deployed as part of the Salt Waste Processing Facility (SWPF) but that does not meet the waste acceptance criteria for immobilization as grout in the Saltstone Manufacturing and Disposal Facility at SRS. Absent deployment of an alternative cesium removal process, this material will require treatment in the SWPF CSSX system, even though the cesium decontamination factor required is far less than that provided by that system. A conceptual design of a CSSX processing system designed for rapid deployment and having reduced cesium decontamination factor capability has been performed. The proposed accelerated-deployment CSSX system (CSSX-A) has been designed to have a processing rate of 3 million gallons per year, assuming 90% availability. At a more conservative availability of 75% (reflecting the novelty of the process), the annual processing capacity is 2.5 million gallons. The primary component of the process is a 20-stage cascade of centrifugal solvent extraction contactors. The decontamination and concentration factors are 40 and 15, respectively. The solvent, scrub, strip, and wash solutions are to have the same compositions as those planned for the SWPF CSSX system. As in the SWPF CSSX system, the solvent and scrub flow rates are equal. The system is designed to facilitate remote operation and direct maintenance. Two general deployment concepts were considered: (1) deployment in an existing but unused SRS facility and (2) deployment in transportable containers. Deployment in three transportable containers was selected as the preferred option, based on concerns regarding facility availability (due to competition from other processing alternatives) and decontamination and renovation costs. A risk assessment identified environmental, safety, and health issues that exist. These concerns have been addressed in the conceptual design by inclusion of mitigating system features. Due to the highly developed state of CSSX technology, only a few technical issues remain unresolved; however, none of these issues have the potential to make the technology unviable. Recommended development tasks that need to be performed to address technical uncertainties are discussed in this report. Deployment of the proposed CSSX-A system provides significant qualitative and quantitative benefits. The qualitative benefits include (1) verification of full-scale contactor performance under CSSX conditions that will support SWPF CSSX design and deployment; (2) development of design, fabrication, and installation experience bases that will be at least partially applicable to the SWPF CSSX system; and (3) availability of the CSSX-A system as a means of providing contactor-based solvent extraction system operating experience to SWPF CSSX operating personnel. Estimates of fixed capital investment, development costs, and annual operating cost for SRS deployment of the CSSX-A system (in mid-2003 dollars) are $9,165,199, $2,734,801, and $2,108,820, respectively. When the economics of the CSSX-A system are compared with those of the baseline SWPF CSSX system, benefit-to-cost ratios ranging from 20 to 47 are obtained. The benefits in the cost/benefit comparison arise from expedited tank closure and reduced engineering, construction, and operating costs for the SWPF CSSX system. No significant impediments to deployment were determined in the reported a

  7. Hitting the target: fragment screening with acoustic in situ co-crystallization of proteins plus fragment libraries on pin-mounted data-collection micromeshes

    SciTech Connect (OSTI)

    Yin, Xingyu; Scalia, Alexander; Leroy, Ludmila; Cuttitta, Christina M.; Polizzo, Gina M.; Ericson, Daniel L.; Roessler, Christian G.; Campos, Olven; Ma, Millie Y.; Agarwal, Rakhi; Jackimowicz, Rick; Allaire, Marc; Orville, Allen M.; Sweet, Robert M.; Soares, Alexei S.

    2014-05-01

    A method is presented for screening fragment libraries using acoustic droplet ejection to co-crystallize proteins and chemicals directly on micromeshes with as little as 2.5 nl of each component. This method was used to identify previously unreported fragments that bind to lysozyme, thermolysin, and trypsin. Acoustic droplet ejection (ADE) is a powerful technology that supports crystallographic applications such as growing, improving and manipulating protein crystals. A fragment-screening strategy is described that uses ADE to co-crystallize proteins with fragment libraries directly on MiTeGen MicroMeshes. Co-crystallization trials can be prepared rapidly and economically. The high speed of specimen preparation and the low consumption of fragment and protein allow the use of individual rather than pooled fragments. The Echo 550 liquid-handling instrument (Labcyte Inc., Sunnyvale, California, USA) generates droplets with accurate trajectories, which allows multiple co-crystallization experiments to be discretely positioned on a single data-collection micromesh. This accuracy also allows all components to be transferred through small apertures. Consequently, the crystallization tray is in equilibrium with the reservoir before, during and after the transfer of protein, precipitant and fragment to the micromesh on which crystallization will occur. This strict control of the specimen environment means that the crystallography experiments remain identical as the working volumes are decreased from the few microlitres level to the few nanolitres level. Using this system, lysozyme, thermolysin, trypsin and stachydrine demethylase crystals were co-crystallized with a small 33-compound mini-library to search for fragment hits. This technology pushes towards a much faster, more automated and more flexible strategy for structure-based drug discovery using as little as 2.5 nl of each major component.

  8. Program for the Inspection of Nickel Alloy Components Report from the Program’s Steering Committee: Inspection of Bottom-Mounted Instrumentation Nozzles Round Robin

    SciTech Connect (OSTI)

    Cumblidge, Stephen E.; Heasler, Patrick G.; Doctor, Steven R.; Taylor, Theodore T.

    2009-11-13

    The U.S. Nuclear Regulatory Commission (NRC) executed agreements with organizations in Japan, Sweden, South Korea, Finland, and the United States to establish the Program for the Inspection of Nickel Alloy Components (PINC).

  9. ITP Aluminum: Technical Working Group on Inert Anode Technologies

    Energy Savers [EERE]

    HSRUWRIWKH $PHULFDQ6RFLHW\RI 0HFKDQLFDO(QJLQHHUV* 7HFKQLFDO:RUNLQJ*URXSRQ ,QHUW$QRGH7HFKQRORJLHV XQGHUFRQWUDFWWR 7KH86'HSDUWPHQWRI(QHUJ\ 2IILFHRI,QGXVWULDO7HFKQRORJLHV -XO\ CRTD - Vol. 53 5HSRUWRIWKH $PHULFDQ6RFLHW\RI 0HFKDQLFDO(QJLQHHUV* 7HFKQLFDO:RUNLQJ*URXSRQ ,QHUW$QRGH7HFKQRORJLHV

  10. Workbook Contents

    U.S. Energy Information Administration (EIA) Indexed Site

    Date:","12312015" ,"Next Release Date:","01292016" ,"Excel File Name:","n3050ri3m.xls" ,"Available from Web Page:","http:tonto.eia.govdnavnghistn3050ri3m.htm"...

  11. What Does a Scattering Pattern Tell US?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    amplitude e iwt Phase difference Phase difference S e i (ri Q) A(DK) fi A(Q) Fourier Transform ( ri ) DK Q 4p sin(q) l Lensless Imaging Sample Space Scattering Space...

  12. TCAP Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WR DGGLWLRQDO LQIRUPDWLRQ 7KLV ZHEVLWH LV XSGDWHG DV PRUH LQIRUPDWLRQ EHFRPHV DYDLODEOH HUH DUH VRPH H DPSOHV RI WKH W SHV RI LQIRUPDWLRQ RX FDQ IQG WKHUH * Experiment Planning...

  13. NewRegulatoryModels-Print.pdf

    Office of Environmental Management (EM)

    &24;' 5DWH PHFKDQLVPV WKDW PD OLPLW WKH LPSDFW RI GLVWULEXWHG UHVRXUFHV RQ XWLOLW HDUQLQJV LQ :HVWHUQ VWDWHV...

  14. Department of Energy Announces Quadrennial Energy Review Public Meeting in Rhode Island, Connecticut

    Broader source: Energy.gov [DOE]

    Advisory of a two-part Quadrennial Energy Review public meeting in Providence, R.I. and Hartford, Conn.

  15. DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RI | Department of Energy Caldwell and Johnson, Charlestown, RI DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI Case study of a DOE Zero Energy Ready affordable home in Charlestown, RI, that achieved a HERS Index of 47 without PV. The 2,244-ft2 two-story home with basement has 2x6 walls filled with 5.5 in. (R-23) 2-lb open-cell spray foam, R-12 closed-cell spray foam under the slab, and

  16. High Permeability Ternary Palladium Alloy Membranes with Improved Sulfur and Halide Tolerances

    SciTech Connect (OSTI)

    K. Coulter

    2010-12-31

    The project team consisting of Southwest Research Institute{reg_sign} (SwRI{reg_sign}), Georgia Institute of Technology (GT), the Colorado School of Mines (CSM), TDA Research, and IdaTech LLC was focused on developing a robust, poison-tolerant, hydrogen selective free standing membrane to produce clean hydrogen. The project completed on schedule and on budget with SwRI, GT, CSM, TDA and IdaTech all operating independently and concurrently. GT has developed a robust platform for performing extensive DFT calculations for H in bulk palladium (Pd), binary alloys, and ternary alloys of Pd. Binary alloys investigated included Pd96M4 where M = Li, Na, Mg, Al, Si, Sc, Ti, V, Cr, Mn, Fe, Co, Ni, Cu, Zn, Ga, Y, Zr, Nb, Mo, Tc, Ru, Rh, Ag, Cd, In, Sn, Sb, Te, Hf, Ta, W, Re, Os, Ir, Pt, Au, Tl, Pb, Bi, Ce, Sm, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu. They have also performed a series of calculations on Pd{sub 70}Cu{sub 26}Ag{sub 4}, Pd{sub 70}Cu{sub 26}Au{sub 4}, Pd{sub 70}Cu{sub 26}Ni{sub 4}, Pd{sub 70}Cu{sub 26}Pt{sub 4}, and Pd{sub 70}Cu{sub 26}Y{sub 4}. SwRI deposited and released over 160 foils of binary and ternary Pd alloys. There was considerable work on characterizing and improving the durability of the deposited foils using new alloy compositions, post annealing and ion bombardment. The 10 and 25 {micro}m thick films were sent to CSM, TDA and IdaTech for characterization and permeation testing. CSM conducted over 60 pure gas permeation tests with SwRI binary and ternary alloy membranes. To date the PdAu and PdAuPt membranes have exhibited the best performance at temperatures in the range of 423-773 C and their performance correlates well with the predictions from GT. TDA completed testing under the Department of Energy (DOE) WGS conditions on over 16 membranes. Of particular interest are the PdAuPt alloys that exhibited only a 20% drop in flux when sulfur was added to the gas mixture and the flux was completely recovered when the sulfur flow was stopped. IdaTech tested binary and ternary membranes on a simulated flue gas stream and experienced significant difficulty in mounting and testing the sputter deposited membranes. IdaTech was able to successfully test PdAu and PdAuPt membranes and saw similar sulfur tolerance to what TDA found. The Program met all the deliverables on schedule and on budget. Over ten presentations at national and international conferences were made, four papers were published (two in progress) in technical journals, and three students (2 at GT and 1 at CSM) completed their doctorates using results generated during the course of the program. The three major findings of program were; (1) the DFT modeling was verified as a predictive tool for the permeability of Pd based ternary alloys, (2) while magnetron sputtering is useful in precisely fabricating binary and ternary alloys, the mechanical durability of membranes fabricated using this technique are inferior compared to cold rolled membranes and this preparation method is currently not ready for industrial environments, (3) based on both modeling and experimental verification in pure gas and mixed gas environments PdAu and PdAuPt alloys were found to have the combination of the highest permeability and tolerance to sulfur.

  17. Grant County, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Grant, Wisconsin Livingston, Wisconsin Millville, Wisconsin Montfort, Wisconsin Mount Hope, Wisconsin Mount Ida, Wisconsin Muscoda, Wisconsin North Lancaster, Wisconsin Patch...

  18. DOE - Office of Legacy Management -- Norfolk Naval Station -...

    Office of Legacy Management (LM)

    FUSRAP Also see Documents Related to NORFOLK NAVAL STATION VA.05-1 - DOE Memorandum; Williams to File; Subject: Elimination of Sites from FUSRAP; December 23, 1993 VA.05-2 -...

  19. Worksheet

    U.S. Energy Information Administration (EIA) Indexed Site

    ... "VA",6168,"North Anna",1,920,692457,625518,692798,671787,691816,665108,681385,498737,0,0,330856,692666,6243128 "VA",6168,"North Anna",2,943,709056,655361,722340,698...

  20. Workbook Contents

    U.S. Energy Information Administration (EIA) Indexed Site

    Date:","12312015" ,"Next Release Date:","01292016" ,"Excel File Name:","n3050va3m.xls" ,"Available from Web Page:","http:tonto.eia.govdnavnghistn3050va3m.htm"...

  1. Researchers Develop Multi-Sensing Probe To Assess Bed Sores ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    work VA is doing with our private sector colleagues to advance the science of health care for our Veterans," said Dr. Carolyn Clancy, VA's Interim Under Secretary for Health....

  2. A=10B (1988AJ01)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8AJ01) (See Energy Level Diagrams for 10B) GENERAL: See also (1984AJ01) and Table 10.5 Table of Energy Levels (in PDF or PS). Shell and deformed models: (1983VA31, 1984VA06,...

  3. Quarterly Nuclear Deployment Summary, January 2012 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    091808 112508 Ph. 2 Ph. 3 Dominion Energy North Anna VA US-APWR 1 112707 12808 Ph. ... Grand Gulf (MS), 4507; Dominion - North Anna (VA), 11 2707; Southern - Vogtle site ...

  4. Effect of supplementation on vitamin A and zinc nutriture of children in northeast (NE) Thailand

    SciTech Connect (OSTI)

    Udomkesmalee, E.; Dhanamitta, S.; Charoenklatkul, S.; Tantipopipat, S.; Banjong, O.; Rojroongwasinkul, N.; Kramer, T.R.; Smith, J.C. Jr. USDA, Beltsville, MD )

    1991-03-11

    Previous surveys of the nutritional status of young children in NE Thailand suggested that they may benefit from vitamin A (VA) and/or zinc (Zn) supplementation. 140 children, with low plasma retinol concentrations were entered in a double-blind study. They were randomized and supplemented with either VA, Zn, VA + Zn or placebo each weekday for 6 mos. All subjects consumed their usual diet that provided adequate protein, less than recommended calories, fat, Zn and VA. Biochemical indices of VA and Zn status increased significantly. The children had adequate VA liver stores as assessed by relative dose response. Zn supplementation resulted in improvement of vision restoration time in dim light using rapid dark adaptometry. VA and Zn synergistically normalized conjunctival epithelium after a 6 mo supplementation. Data suggest that functional improvements of populations with suboptimal VA and Zn nutriture can be accomplished by supplementation with {lt}2 times of RDA of these nutrients.

  5. Surrounding Area Restaurants...Hungry

    Energy Savers [EERE]

    VA, 22202 (703) 414-8211 CHAMPPS Americana - Enjoy a wonderful dinner with friends and family: 1101 South Joyce Street, Arlington VA, 22202 (703) 414-3601 Pizza Milano - Melt in...

  6. Critical Materials Workshop Final Participant List

    Broader source: Energy.gov [DOE]

    List of participants who attended the Critical Materials Workshop held on April 3, 2012 in Arlington, VA

  7. Better Buildings Neighborhood Program Workforce Peer Exchange...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Organizations * Austin, TX * Boulder County, CO * California Center for Sustainable Energy * Charlottesville, VA * Chicago, IL * Energy Efficiency Management * ...

  8. Energy Efficiency Financing and Valuation

    Broader source: Energy.gov [DOE]

    Lead Performer: JDM Associates – Falls Church, VA Partner: Lawrence Berkeley National Laboratory (LBNL) – Berkeley, CA

  9. Workplace Charging Challenge Partner: Capital One Financial Corporation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Capital One Financial Corporation Workplace Charging Challenge Partner: Capital One Financial Corporation Workplace Charging Challenge Partner: Capital One Financial Corporation Joined the Challenge: January 2014 Headquarters: McLean, VA Charging Locations: Richmond, VA; McLean, VA; Chester, VA; Plano, TX; Wilmington, DE Domestic Employees: 41,300 Capital One's Environmental Program seeks to reduce greenhouse gas (GHG) emissions throughout the organization's facilities

  10. MEETING MATERIALS: JUNE 26, 2015

    Broader source: Energy.gov [DOE]

    Westin Crystal CityCrystal Ballroom VI (Located on the Second Floor)1800 Jefferson Davis HighwayArlington, VA 22202

  11. High Temperature Membrane Working Group Meeting, May 14, 2007

    Broader source: Energy.gov [DOE]

    This agenda provides information about the High Temperature Membrane Working Group Meeting on May 14, 2007 in Arlington, Va.

  12. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Technologies INC, Alexandria, VA","USDOE","15 GEOTHERMAL ENERGY; 24 POWER TRANSMISSION AND DISTRIBUTION; CAPITAL; CONSTRUCTION; EMPLOYMENT; EXPLORATION; GEOTHERMAL...

  13. Utility Partnerships

    Broader source: Energy.gov [DOE]

    Utility Partnerships 7/10/12. Provides an overview of LEAP's (Charlottesville, VA) partnership with local utilities.

  14. Comments on Draft Final Remedial Investigation (RI) for the Quarry Residuals Operable Unit, and Draft Final Baseline Risk Assessment (BRA) for the Quarry Residuals Operable Unit of the Weldon Spring Site, Both Dated April 1997. QY-500-501-1.03.

    Office of Legacy Management (LM)

  15. Development of Toroidal Core Transformers

    SciTech Connect (OSTI)

    Leon, Francisco

    2014-05-31

    The original objective of this project was to design, build and test a few prototypes of singlephase dry-type distribution transformers of 25 kVA, 2.4 kV primary to 120 V transformers using cores made of a continuous steel strip shaped like a doughnut (toroid). At different points during the development of the project, the scope was enhanced to include the more practical case of a 25 kVA transformer for a 13.8 kV primary system voltage. Later, the scope was further expanded to design and build a 50 kVA unit to transformer voltage from 7.62 kV to 2x120 V. This is a common transformer used by Con Edison of New York and they are willing to test it in the field. The project officially started in September 2009 and ended in May 2014. The progress was reported periodically to DOE in eighteen quarterly reports. A Continuation Application was submitted to DOE in June 2010. In May 2011 we have requested a non-cost extension of the project. In December 2011, the Statement of Project Objectives (SOPO) was updated to reflect the real conditions and situation of the project as of 2011. A second Continuation Application was made and funding was approved in 2013 by DOE and the end date was extended to May 2014.The technical challenges that were overcome in this project include: the development of the technology to pass the impulse tests, derive a model for the thermal performance, produce a sound mechanical design, and estimate the inrush current. However, the greatest challenge that we faced during the development of the project was the complications of procuring the necessary parts and materials to build the transformers. The actual manufacturing process is relatively fast, but getting all parts together is a very lengthy process. The main products of this project are two prototypes of toroidal distribution transformers of 7.62 kV (to be used in a 13.8 kV system) to 2x120 V secondary (standard utilization voltage); one is rated at 25 kVA and the other at 50 kVA. The 25 kVA transformer passed the impulse test in KEMA high-voltage laboratories. Additional products include: nine papers published in the IEEE Transactions on Power Delivery, one patent has been filed, three PhD students were supported from beginning to graduation, five postdoctoral fellows, and three MSc students were partially supported. The electrical characteristics of our dry-type toroidal transformers are similar to those of the oil-immersed pole mounted transformers currently in use by many utilities, but toroids have higher efficiency. The no-load losses of the 50 kVA prototype are only 45 W. A standard transformer has no-load losses between 90 and 240 W. Thus, even the finest transformer built today with standard technology has double the amount of no-load losses than the prototype toroidal transformer. When the manufacturing process is prepared for mass production, the cost of a dry-type toroidal transformer would be similar to the price of an oil-filed standard design. However, because of the greatly reduced losses, the total ownership cost of a toroidal transformer could be about half of a traditional design. We got a grant from Power Bridge NY in the amount of $149,985 from June 2014 to May 2015 to continue developing the transformer with commercialization objectives. We are considering the possibility to incorporate a company to manufacture the transformers and have contacted investors. The current status of the real life testing is as follows: after several months of silence, Con Edison has re-started conversations and has shown willingness to test the transformer. Other companies, PSE&G and National Grid have recently also shown interest and we will present our product to them soon.

  16. Portsmouth Site | Department of Energy

    Office of Environmental Management (EM)

    Decontamination and Decommissioning Evaluation Project | Department of Energy RI/FS Report for the Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project Portsmouth RI/FS Report for the Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project This remedial investigation/feasibility study (RI/FS), the Remedial Investigation and Feasibility Study Report for the Process Buildings and Complex Facilities

  17. Document Number Q0029500 Introduction

    Office of Legacy Management (LM)

    Introduction 1.0 Introduction This Remedial Investigation (RI) AddendumRocused Feasibility Study (FFS) report updates the 1998 final RI and presents the results of a FFS conducted for Operable Unit (OU) 111, contaminated surface water and ground water, of the Monticello Mill Tailings Site (MMTS). These documents are combined to promote better reference between the updated RI information and the remedy comparisons of the FFS. This document is prepared by the U.S. Department of Energy (DOE) Grand

  18. DOE Zero Energy Ready Home Case Study: Promethean Homes, Charlottesville,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VA | Department of Energy Promethean Homes, Charlottesville, VA DOE Zero Energy Ready Home Case Study: Promethean Homes, Charlottesville, VA DOE Zero Energy Ready Home Case Study: Promethean Homes, Charlottesville, VA Case study of a DOE Zero Energy Ready home in Charlottesville, VA, that achieves a HERS 33 without PV. The 2,572-ft2 custom home with daylight basement, has 2x6 advanced framed walls filled with R-21 cellulose plus 2-in. rigid mineral wool insulation over the plywood sheathing,

  19. 100-D/H Remedial Investigation/ Feasibility Study /Proposed Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remedial Investigation/ Feasibility Study /Proposed Plan Nina Menard Washington State Department of Ecology 100-D/H RI/FS/PP * Received Draft RI/FS/PP on December 14, 2012 * Submitted comments to DOE on March 12, 2013 * DOE and Ecology are meeting to start the resolution process 100-D/H RI/FS/PP * Good points o Fairly well written o Results of borehole data didn't find any smoking guns. 100-D/H RI/FS/PP Issues o Selection of Contaminants Of Concern/Contaminants Of Potential Concern (COC/COPC) o

  20. Small-Scale Solar Grants | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Sector Name State Administrator Commerce RI Website http:www.commerceri.comfinanceREF-Small%20Scale.php Funding Source Rhode Island Renewable Energy Fund (RIREF);...

  1. DOE Zero Energy Ready Home Case Study, Caldwell and Johnson,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Charlestown, RI DOE Zero Energy Ready Home: Healthy Efficient Homes - Spirit Lake, Iowa DOE Zero Energy Ready Home Case Study: Preferred Builders, Old Greenwich, CT, Custom

  2. Block Island Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    energy Facility Type Commercial Scale Wind Facility Status Proposed Developer Deepwater Wind Location Offshore from Block Island RI Coordinates 41.1, -71.53 Show Map Loading...

  3. Bluewater Wind Rhode Island | Open Energy Information

    Open Energy Info (EERE)

    Island Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner NRG Bluewater Wind Developer NRG Bluewater Wind Location Atlantic Ocean RI Coordinates...

  4. Mound Plant Federal Facility Agreement, July 15, 1993 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA; Ohio EPA (OEPA); DOE Date 07151993 SCOPE * Identify Interim Remedial Action (IRA) alternatives which include Remedial Investigations (RI) and Feasibility Studies (FS);...

  5. Microsoft PowerPoint - RIMA_McCourt_21Apr2014.Providence.pptx

    Broader source: Energy.gov (indexed) [DOE]

    Executive Director RI Manufacturers Association Power Prices Highly Correlated to Gas Prices Gas fired generation is a significant portion of the generation mix for New...

  6. NETL F 451.1/1-1, Categorical Exclusion Designation Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TBD Gordon Research Confer Kingston, RI Conference Hotel for 2016 Conference - Hotel Galvez, Galveston, TX Conference Hotel for 2018, 2020 occurrence of Conference - TBD FESCNGO...

  7. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Agricultural, Institutional Savings Category: Wind (All), Wind (Small) Local Option- Property Tax Exemption for Renewable Energy Systems Note that a separate statute (R.I....

  8. Sensitivity of a global climate model to the critical Richardson number in the boundary layer parameterization

    SciTech Connect (OSTI)

    Zhang, Ning; Liu, Yangang; Gao, Zhiqiu; Li, Dan

    2015-04-27

    The critical bulk Richardson number (Ricr) is an important parameter in planetary boundary layer (PBL) parameterization schemes used in many climate models. This paper examines the sensitivity of a Global Climate Model, the Beijing Climate Center Atmospheric General Circulation Model, BCC_AGCM to Ricr. The results show that the simulated global average of PBL height increases nearly linearly with Ricr, with a change of about 114 m for a change of 0.5 in Ricr. The surface sensible (latent) heat flux decreases (increases) as Ricr increases. The influence of Ricr on surface air temperature and specific humidity is not significant. The increasing Ricr may affect the location of the Westerly Belt in the Southern Hemisphere. Further diagnosis reveals that changes in Ricr affect stratiform and convective precipitations differently. Increasing Ricr leads to an increase in the stratiform precipitation but a decrease in the convective precipitation. Significant changes of convective precipitation occur over the inter-tropical convergence zone, while changes of stratiform precipitation mostly appear over arid land such as North Africa and Middle East.

  9. Pascoag Utility District | Open Energy Information

    Open Energy Info (EERE)

    search Name: Pascoag Utility District Place: Rhode Island Website: www.pud-ri.org Twitter: @PascoagUtility Facebook: https:www.facebook.comPascoagUtilityDistrict Outage...

  10. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Commercial-Scale Renewable-Energy Grants The Rhode Island Commerce Corporation (Commerce RI) seeks to fund commercial scale renewable energy projects to generate electricity for...

  11. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Small-Scale Solar Grants Commerce RI provides incentives for renewable-energy projects. Incentive programs are funded by the Rhode Island Renewable Energy Fund (REF) and...

  12. Tax Credits, Rebates & Savings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Credits, Rebates & Savings Tax Credits, Rebates & Savings Small-Scale Solar Grants Commerce RI provides incentives for renewable-energy projects. Incentive programs are funded...

  13. Microsoft PowerPoint - RCBRA Eco 10.12.11.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RCBRA Ecological Risk Assessment Overview Hanford Advisory Board River and Plateau Committee October 2011 Purpose * River Corridor Baseline Risk Assessment - Ecological Risk f ( ) h b b d h Assessment Draft C (RCBRA-Eco) has been submitted to the Regulators * Information presented forms the basis for ecological risk in th Ri C id RI/FS d t the River Corridor RI/FS documents - The RCBRA-Eco is an evaluation across the River Corridor - The RI/FS documents use Operable Unit-specific information

  14. untitled

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Terminal Woodbridge, NJ 1,000 Williams Energy Services New Haven, CT 500 Motiva Enterprises LLC New Haven, CT 250 Motiva Enterprises LLC Providence, RI 250 Source: Energy...

  15. Energy Revolving Loan Fund | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Revolving Loan Fund (ELF) which provides low interest loans for RI business for energy saving investments. This loan program is funded by reprogrammed stimulus money from the...

  16. Developments in High Efficiency Engine Technologies and an Introductio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Developments in High Efficiency Engine Technologies and an Introduction to SwRI's Dedicated EGR Concept Developments in High Efficiency Engine Technologies and an Introduction to...

  17. H.E.; Correia, R.J.; Kestin, J. 15 GEOTHERMAL ENERGY; 21 SPECIFIC...

    Office of Scientific and Technical Information (OSTI)

    energy resources are found in reasonable proximity. Dep. NTIS, PC A03MF A01. Brown Univ., Providence, RI (USA). Div. of Engineering Not Available United States...

  18. MIT Plasma Science & Fusion Center: research, alcator, publications...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4th Annual Meeting of the APS Division of Plasma Physics, Providence, RI - 2012 Alcator Introduction Facility Information Tokamak Data & Real-Time Information Computer & Data...

  19. Robots with AI: A retrospective on the AAAI robot competitions...

    Office of Scientific and Technical Information (OSTI)

    Authors: Bonasso, P. 1 ; Dean, T. 2 + Show Author Affiliations NASA, Houston, TX (United States) Brown Univ., Providence, RI (United States) Publication Date: 1996-12-31 OSTI ...

  20. MULTI-COLOR OPTICAL AND NEAR-INFRARED LIGHT CURVES OF 64 STRIPPED-ENVELOPE CORE-COLLAPSE SUPERNOVAE

    SciTech Connect (OSTI)

    Bianco, F. B.; Modjaz, M. [Center for Cosmology and Particle Physics, New York University, 4 Washington Place, New York, NY 10003 (United States); Hicken, M.; Friedman, A.; Kirshner, R. P.; Challis, P.; Marion, G. H. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Bloom, J. S. [Department of Astronomy, University of California, Berkeley, CA 94720-3411 (United States); Wood-Vasey, W. M. [PITT PACC, Department of Physics and Astronomy, 3941 O'Hara Street, University of Pittsburgh, Pittsburgh, PA 15260 (United States); Rest, A., E-mail: fb55@nyu.edu [Space Telescope Science Institute, 3700 San Martin Drive, Baltimore, MD 21218 (United States)

    2014-08-01

    We present a densely sampled, homogeneous set of light curves of 64 low-redshift (z ? 0.05) stripped-envelope supernovae (SNe of Type IIb, Ib, Ic, and Ic-BL). These data were obtained between 2001 and 2009 at the Fred L. Whipple Observatory (FLWO) on Mount Hopkins in Arizona, with the optical FLWO 1.2 m and the near-infrared (NIR) Peters Automated Infrared 1.3 m telescopes. Our data set consists of 4543 optical photometric measurements on 61 SNe, including a combination of U BV RI, U BV r{sup ?}i{sup ?}, and u{sup ?} BV r{sup ?}i{sup ?}, and 1919 JHK{sub s} NIR measurements on 25 SNe. This sample constitutes the most extensive multi-color data set of stripped-envelope SNe to date. Our photometry is based on template-subtracted images to eliminate any potential host-galaxy light contamination. This work presents these photometric data, compares them with data in the literature, and estimates basic statistical quantities: date of maximum, color, and photometric properties. We identify promising color trends that may permit the identification of stripped-envelope SN subtypes from their photometry alone. Many of these SNe were observed spectroscopically by the Harvard-Smithsonian Center for Astrophysics (CfA) SN group, and the spectra are presented in a companion paper. A thorough exploration that combines the CfA photometry and spectroscopy of stripped-envelope core-collapse SNe will be presented in a follow-up paper.

  1. BPA-2012-01350-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    r ri S'&'ri H - Ex 6 11 TI I I.'ii. *. - I 1 24 r V I It9P H 41h I -J T 806 1: 4... I U Lol 7 - p ---.. I 41 7 It oil - Lol 5136.O5 I 1 In Aft- law 1200 X. I I I...

  2. Wniwick Business Solutions P/L | Open Energy Information

    Open Energy Info (EERE)

    Wniwick Business Solutions PL Jump to: navigation, search Name: Wniwick Business Solutions PL Address: 739 Mount Macedon Road Place: Mount Macedon, Australia Number of Employees:...

  3. Surficial Extent And Conceptual Model Of Hydrothermal System...

    Open Energy Info (EERE)

    And Conceptual Model Of Hydrothermal System At Mount Rainier, Washington Abstract A once massive hydrothermal system was disgorged from the summit of Mount Rainier in a highly...

  4. Vlf Electromagnetic Investigations Of The Crater And Central...

    Open Energy Info (EERE)

    Of Mount St Helens, Washington Abstract A very low frequency (VLF) electromagnetic induction survey in the crater of Mount St. Helens has identified several electrically...

  5. Hancock County, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Ohio Bluffton, Ohio Findlay, Ohio Fostoria, Ohio Jenera, Ohio McComb, Ohio Mount Blanchard, Ohio Mount Cory, Ohio Rawson, Ohio Van Buren, Ohio Vanlue, Ohio Retrieved from...

  6. Clermont County, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Batavia, Ohio Bethel, Ohio Chilo, Ohio Day Heights, Ohio Felicity, Ohio Loveland, Ohio Milford, Ohio Moscow, Ohio Mount Carmel, Ohio Mount Repose, Ohio Mulberry, Ohio Neville, Ohio...

  7. Comments from the Sierra Club on the Department of Energy Emergency Order

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Resume Limited Operation at the Potomac River Generating Station in Alexandria, VA | Department of Energy from the Sierra Club on the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station in Alexandria, VA Comments from the Sierra Club on the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station in Alexandria, VA Docket No. EO-05-01: This letter is in response to the Department of Energy

  8. Comments on Emergency Order to Resume Limited Operation at the Potomac

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. | Department of Energy on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. Comments on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. Docket No. EO-05-01: This letter is in response to the Department of Energy Emergency

  9. Contract Specialist | Department of Energy

    Energy Savers [EERE]

    Energy Contract Connections @ ChallengeHER, Norfolk VA, October 14 Contract Connections @ ChallengeHER, Norfolk VA, October 14 The U.S. Small Business Administration (SBA), Women Impacting Public Policy (WIPP), and American Express OPEN have partnered to host this special FREE contracting event for women business owners. American Express OPEN will hold a Contract Connections session at the ChallengeHER - Norfolk Event, on October 14th, 2014 at the Webb University Center, Norfolk, VA. PDF

  10. Neutron Absorbing Alloys

    DOE Patents [OSTI]

    Zhong, Yuanzhen , Parikh, Hemant; Smith, Terry E.

    2002-05-28

    A process for making homogeneous copolymers of vinylpyrrolidone (VP) and vinyl acetate (VA) which form clear aqueous solutions and have high cloud points. The process involves precharging VP and VA monomers in a predetermined ratio, and then feeding VP and VA at a predetermined rate, the ratio of the components in the initial charge and the feeding rates for the monomer being selected in accordance with the reactivity rates of the monomers towards copolymerization as opposed to homopolymerization.

  11. Cognitive Foundations for Visual Analytics

    SciTech Connect (OSTI)

    Greitzer, Frank L.; Noonan, Christine F.; Franklin, Lyndsey

    2011-02-25

    In this report, we provide an overview of scientific/technical literature on information visualization and VA. Topics discussed include an update and overview of the extensive literature search conducted for this study, the nature and purpose of the field, major research thrusts, and scientific foundations. We review methodologies for evaluating and measuring the impact of VA technologies as well as taxonomies that have been proposed for various purposes to support the VA community. A cognitive science perspective underlies each of these discussions.

  12. Department of the Army Letterhead

    Office of Environmental Management (EM)

    Department of Energy Department of Veterans Affairs Medical Center, San Francisco, California Department of Veterans Affairs Medical Center, San Francisco, California San Francisco VA Medical Center The San Francisco VA Medical Center is saving more than $500,000 and almost 3 million kWh every year through a retrofit financed by FEMP's Super ESPC Program. Overview The Veterans Affairs (VA) Medical Center in San Francisco is saving almost 3 million kilowatt-hours of electricity, more than

  13. Other Participants 1994 | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    ... School , Tahlequah , OK Thomas Jefferson High School , Alexandria , VA Turpin High School , Cincinnati , OH Venice High School , Los Angeles , CA Westminster School , Atlanta , GA

  14. Even- and Odd-Parity Charmed Meson Masses in Heavy Hadron Chiral...

    Office of Scientific and Technical Information (OSTI)

    Relation: Other Information: No journal information given for this preprint; PBD: 1 Mar 2005 Research Org: Thomas Jefferson National Accelerator Facility, Newport News, VA...

  15. Positron Emission Mammography with Multiple Angle Acquisition...

    Office of Scientific and Technical Information (OSTI)

    DOE Contract Number: AC05-84ER40150 Resource Type: Conference Resource Relation: Conference: 2002 IEEE Nuclear Science Symposium and Medical Imaging Conference, Norfolk, VA (US), ...

  16. Positron Emission Mammography with Multiple Angle Acquisition...

    Office of Scientific and Technical Information (OSTI)

    ... DOE Contract Number: AC05-84ER40150 Resource Type: Conference Resource Relation: Conference: 2002 IEEE Nuclear Science Symposium and Medical Imaging Conference, Norfolk, VA (US), ...

  17. Optimizing Pinhole and Parallel Hole Collimation for Scintimammography...

    Office of Scientific and Technical Information (OSTI)

    ... DOE Contract Number: AC05-84ER40150 Resource Type: Conference Resource Relation: Conference: 2002 IEEE Nuclear Science Symposium and Medical Imaging Conference, Norfolk, VA (US), ...

  18. Document Library | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    City Jefferson Ballroom III 1800 Jefferson Davis Highway Arlington, VA 22202 January 30, 2015 2014 Wall Street Perspectives on SMRs - Report 2014 Wall Street Perspectives on SMRs...

  19. Jefferson Lab Celebrates 2005: World Year of Physics | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    World Year of Physics Jefferson Lab Celebrates 2005: World Year of Physics January 24, 2005 Newport News, Va. - This year marks the 100th anniversary of Albert Einstein's ...

  20. Award enables research for more efficient accelerators | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award enables research for more efficient accelerators A furnace system designed by ... Award enables research for more efficient accelerators NEWPORT NEWS, VA, May 12, 2016 - ...

  1. Volvo Trucks North America | Open Energy Information

    Open Energy Info (EERE)

    Volvo Trucks North America Jump to: navigation, search Name: Volvo Trucks North America Place: Dublin, VA Information About Partnership with NREL Partnership with NREL Yes...

  2. Mr. Carl Schafer Director of Environmental Policy

    Office of Legacy Management (LM)

    ... that the Center's Power Plant Laboratory y ... work sponsored by the Nuclear Regulatory Commission is ... Naval Proving Ground I ' Dahlgren, VA An AEC Health & Safety ...

  3. Mr. Carl Schafer Director of Environmental Policy

    Office of Legacy Management (LM)

    ... that the Center's Power Plant Laboratory y ... work sponsored by the Nuclear Regulatory Commission is ... Naval Proving Ground I ' Dahlyren, VA An AEC Health & Safety ...

  4. Mr. Carl Schafer Director of Environmental Policy

    Office of Legacy Management (LM)

    ... that the Center's Power Plant Laboratory y ... work sponsored by the Nuclear Regulatory Commission is ... Naval Proving Ground j Dahlgren, VA An AEC Health & Safety ...

  5. F

    Office of Legacy Management (LM)

    ... that the Center's Power Plant Laboratory ... work sponsored by the Nuclear Regulatory Commission is ... VA An AEC Health & Safety Laboratory survey ...

  6. Mr. Carl Schafer Director of Environmental Policy

    Office of Legacy Management (LM)

    Projects Office'of Nuclear Energy 3 Enclosures bee: ... that the Center's Power Plant Laboratory A ... Naval Proving Ground I ' Dahlyren, VA An AEC Health & Safety ...

  7. Understanding the Role of Hot Isostatic Pressing Parameters on...

    Office of Scientific and Technical Information (OSTI)

    Service, Springfield, VA at www.ntis.gov. In this project, Avure and ORNL evaluated the influence of hot isostatic pressing (HIP) and thermal cycling as standalone post...

  8. Corporate Gray Job Fair | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporate Gray Job Fair Corporate Gray Job Fair April 21, 2016 9:00AM to 12:30PM EDT Springfield, VA

  9. Reliable Power Inc | Open Energy Information

    Open Energy Info (EERE)

    Reliable Power Inc Place: Arlington, Virginia Zip: VA 22201 Product: US-based fuel cell manufacturer. Coordinates: 43.337585, -89.379449 Show Map Loading map......

  10. Corrosion Evaluation of Waukesha Metal 88 and Stellite Alloy...

    Office of Scientific and Technical Information (OSTI)

    available copy. Available for sale to the public, in paper, from: U.S. Department of Commerce, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161,...

  11. Anion Exchange Membranes - Transport/Conductivity | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - TransportConductivity Anion Exchange Membranes - TransportConductivity Presentation at the AMFC Workshop, May 8-9, 2011, Arlington, VA PDF icon amfc110811aemstransport.pdf ...

  12. Algal Biofuels Techno-Economic Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Algal Biofuels Techno-Economic Analysis Algae Platform Review March 24, 2015 Alexandria, VA Ryan Davis National Renewable Energy Laboratory This presentation does not contain any ...

  13. Utilities' Use of Nuclear Generation

    SciTech Connect (OSTI)

    Ray, Harold B.

    2002-09-30

    This PowerPoint presentation was given at the Nuclear Energy Research Advisory Committee meeting, held 30 September 2002 in Arlington, VA.

  14. Balancing radar receiver channels with commutation. (Conference...

    Office of Scientific and Technical Information (OSTI)

    Springfield, VA at www.ntis.gov. Abstract not provided. Authors: Doerry, Armin Walter Publication Date: 2015-01-01 OSTI Identifier: 1244859 Report Number(s): ...

  15. Young Physicist from Syracuse University Receives Jefferson Lab...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physicist from Syracuse University Receives Jefferson Lab's 2014 Thesis Prize Beminiwattha Rakitha Beminiwattha NEWPORT NEWS, VA, June 6, 2014 - A young researcher, who worked on...

  16. Application Content and Evaluation Criteria/Process

    Broader source: Energy.gov [DOE]

    This presentation by Jill Gruber of the DOE Golden Field Office was given at the Manufacturing Pre-Solicitation Workshop in Arlington, Va., on May 18, 2007.

  17. What You Missed: Tuesday Talk on The National Medals Laureates of Science,

    Energy Savers [EERE]

    What Will Be This Year's vA3C? What Will Be This Year's vA3C? September 22, 2015 - 1:11pm Addthis Watch a pre-recorded movie of the OpenStudio view_data measure, which uses vA3C to display time series data, here hourly outside surface temperature. Movie credit: Dan Macumber, NREL Thornton Tomasetti’s CORE Studio used vA3C and Pollination (another hackathon product), to develop the multi-dimensional design space exploration tool DesignExplorer. <br />Image credit: Mostapha Roudsari and

  18. Beam Loss Control for the Fermilab Main Injector (Conference...

    Office of Scientific and Technical Information (OSTI)

    the National Technical Information Service, Springfield, VA at www.ntis.gov. Authors: Brown, Bruce C. ; Fermilab Publication Date: 2012-09-01 OSTI Identifier: 1054732 Report...

  19. Volttron (TM) Security Features and Discussions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory Software Framework for Transactive Energy: VOLTTRON(tm), VTARI, Arlington, VA July 29, 2015 1 PNNL-SA-111786 VOLTTRON Team July 29, 2015 2 Software Development ...

  20. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Idaho Chemical Processing Plant, Idaho Falls, ID (United States) Idaho National Engineering Laboratory, ... Facility, Newport News, VA (United States) US ...

  1. Adaptive Wavenumber Estimation for Mode Tracking in a Shallow...

    Office of Scientific and Technical Information (OSTI)

    DOE Contract Number: W-7405-ENG-48 Resource Type: Conference Resource Relation: Conference: Presented at: IEEE OCEANS '12, Hampton Roads, VA, United States, Oct 15 - Oct 18, 2012 ...

  2. Alkaline Membrane Fuel Cell Workshop Welcome and OverviewInnovation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation at the AMFC Workshop, May 8, 2011, Arlington, VA. PDF icon amfc050811pivovar.pdf More Documents & Publications Anion Exchange Membranes for Fuel Cells 2006 Alkaline ...

  3. System Break-Out Session | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation at the AMFC Workshop, May 8-9, 2011, Arliington, VA PDF icon amfc050811systemissues.pdf More Documents & Publications 2011 Alkaline Membrane Fuel Cell Workshop ...

  4. Electrolyte Materials for AMFCs and AMFC Performance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VA PDF icon amfc050811fukuta.pdf More Documents & Publications Breaking the Fuel Cell Cost Barrier 2011 Alkaline Membrane Fuel Cell Workshop Final Report MEA BREAKOUT GROUP

  5. Breaking the Fuel Cell Cost Barrier | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation at the AMFC Workshop, May 8, Arlington, VA PDF icon amfc050811gottesfeldcellera.pdf More Documents & Publications 2011 Alkaline Membrane Fuel Cell Workshop Final ...

  6. ,"Virginia Natural Gas Underground Storage Volume (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    Underground Storage Volume (MMcf)" ,"Click worksheet name or tab at bottom for data" ...dnavnghistn5030va2m.htm" ,"Source:","Energy Information Administration" ,"For Help, ...

  7. Electrocatalysis in Alkaline Electrolytes - Research Overview...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VA PDF icon amfc110811mukerjee.pdf More Documents & Publications Saving the Fuel Cell Dream: Making Non Noble Metal Electrocatalysts a Reality? Fuel Cells: Just a Dream...

  8. Clean Energy Group Virginia | Open Energy Information

    Open Energy Info (EERE)

    Clean Energy Group Virginia Jump to: navigation, search Name: Clean Energy Group (Virginia) Place: Reston, Virginia Zip: VA 20191 Product: Virginia-based state regional office of...

  9. Slide 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rich Ferrare, Chris Hostetler NASA Langley Research Center, VA Phil Russell NASA Ames Research Center ATMOSPHERIC SCIENCE PROGRAM FY 2009 SCIENCE TEAM MEETING Santa Fe, NM February ...

  10. ARM - 2008 ARM Science Team Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM Science Team Meeting March 10 - 14 | Norfolk, Virginia | Sheraton Norfolk Waterside Hotel Meeting Highlights Sheraton Hotel - Norfolk, VA The eighteenth Atmospheric Radiation...

  11. Probing CP Violation in $h\\rightarrow\\gamma\\gamma$ with Converted...

    Office of Scientific and Technical Information (OSTI)

    Information Service, Springfield, VA at www.ntis.gov. Authors: Bishara, Fady ; Grossman, Yuval ; Harnik, Roni ; Robinson, Dean J. ; Shu, Jing ; Zupan, Jure Publication Date:...

  12. Condensing Heating and Water Heating Equipment Workshop Location...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Condensing Heating and Water Heating Equipment Workshop Location: Washington Gas Light Appliance Training Facility 6801 Industrial Road Springfield, VA Date: October 9, 2014 Time: ...

  13. JLab Guest Lecturer Discusses Hurricane Hunting - By Remote Control...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Guest Lecturer Discusses Hurricane Hunting - By Remote Control On April 14 NEWPORT NEWS, Va., March 2, 2009 - Learn how the National Oceanic and Atmospheric Administration and...

  14. BLM Eastern States Office | Open Energy Information

    Open Energy Info (EERE)

    Springfield, VA Zip: 22153 Phone Number: 703-440-1600 ParentHolding Organization: Bureau of Land Management Website: www.blm.govessten.html Retrieved from "http:...

  15. ORISE: Exercise Builder software tool helps DOE design and implement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration to develop an exercise tool for hospitals known as Exercise Builder: Hospital. The VA serves nearly eight million veteran enrollees and their families at more than...

  16. Dublin, Virginia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Virginia: Energy Resources (Redirected from Dublin, VA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 37.1056784, -80.6853433 Show Map Loading map......

  17. Falls Church, Virginia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Church, Virginia: Energy Resources (Redirected from Falls Church, VA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 38.882334, -77.1710914 Show Map Loading...

  18. Mead Westaco | Open Energy Information

    Open Energy Info (EERE)

    Partnership with NREL Yes Partnership Type MOU Partnering Center within NREL National Bioenergy Center Partnership Year 2004 Mead Westaco is a company located in Richmond, VA....

  19. Diagenesis and clay mineral formation at Gale Crater, Mars (Journal...

    Office of Scientific and Technical Information (OSTI)

    the National Technical Information Service, Springfield, VA ... by the Mars Science Laboratory team, we assume ... Portage Water) in an open system with the Fe-rich ...

  20. Hometown News Release | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Researcher Honored with 2013 Federal Laboratory Consortium Award Morgantown, W.Va. - Dr. Stephen E. Zitney of the National Energy Technology Laboratory (NETL) has been awarded a...

  1. Critical Materials Workshop Final Participant List

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... of Energy Satish Vishnubhatla Danfoss David Waldeck U of Pittsburgh Frederick Walker Air Products Critical Materials Workshop April 3, 2012 Arlington, VA Final ...

  2. Warped Conformal Field Theory (Journal Article) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Information Service, Springfield, VA at www.ntis.gov. Authors: Detournay, Stephane ; Harvard U. ; Hartman, Thomas ; Princeton, Inst. Advanced Study ; Hofman, Diego M. ; Harvard...

  3. On Loops in Inflation II: IR Effects in Single Clock Inflation...

    Office of Scientific and Technical Information (OSTI)

    Technical Information Service, Springfield, VA at www.ntis.gov. Authors: Senatore, Leonardo ; Stanford U., ITP KIPAC, Menlo Park ; Zaldarriaga, Matias ; Princeton, Inst....

  4. The Effective Field Theory of Multifield Inflation (Journal Article...

    Office of Scientific and Technical Information (OSTI)

    Technical Information Service, Springfield, VA at www.ntis.gov. Authors: Senatore, Leonardo ; Princeton, Inst. Advanced Study Stanford U., Phys. Dept. KIPAC, Menlo Park ;...

  5. Path Integral for Stochastic Inflation: Non-Perturbative Volume...

    Office of Scientific and Technical Information (OSTI)

    Springfield, VA at www.ntis.gov. Authors: Gratton, Steven ; KIPAC, Menlo Park Cambridge U. Publication Date: 2013-07-01 OSTI Identifier: 1086971 Report Number(s):...

  6. Summary Report from Theory Focus Session on Hydrogen Storage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report provides information about the Theory Focus Session on Hydrogen Storage Materials held on May 18, 2006 in Crystal City, Va. PDF icon theorysessionsummary.pdf More ...

  7. Vision Machine & Fabrication Corp. Named Top Small Business Subcontrac...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision Machine & Fabrication Corp. Named Top Small Business Subcontractor at Jefferson Lab for FY 2014 NEWPORT NEWS, VA, Sept. 10, 2015 - Jefferson Science Associates, the...

  8. Jefferson Lab recognizes its Outstanding Small Business Contractor...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sharon Harrah (center), owner of Triad Machine Shop located in Newport News, Va., receives the award plaque from JLab Director Christoph Leemann (right). Harrah is accompanied by...

  9. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    Chiral dynamics and peripheral transverse densities Granados Carlos G Uppsala University Sweden Weiss Christian JLAB Newport News VA United States PHYSICS OF ELEMENTARY PARTICLES...

  10. Chiral dynamics and peripheral transverse densities Granados...

    Office of Scientific and Technical Information (OSTI)

    dynamics and peripheral transverse densities Granados, Carlos G. Uppsala University (Sweden); Weiss, Christian JLAB, Newport News, VA (United States) 72 PHYSICS OF ELEMENTARY...

  11. Other Participants 1998 | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Marks School of Texas , Dallas , TX Sycamore High School , Cincinnati , OH Tahlequah High School , Tahlequah , OK T. C. Williams High School , Alexandria , VA Texas Academy of Math ...

  12. Efficient Synchronization Stability Metrics for Fault Clearing...

    Office of Scientific and Technical Information (OSTI)

    Technical Information Service, Springfield, VA at www.ntis.gov. Authors: Backhaus, Scott N. 1 ; Chertkov, Michael 1 ; Bent, Russell Whitford 1 ; Bienstock, Daniel 2...

  13. Greenlight Energy Resources Inc GER | Open Energy Information

    Open Energy Info (EERE)

    Charlottesville, Virginia Zip: VA 22902 Sector: Biofuels, Renewable Energy, Solar, Wind energy Product: Charlottesville-based venture capital investor in early-stage renewable...

  14. Slide 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 11 th , 2008 Norfolk, VA * ISDAC will occur from April 1 st to April 30 th * ECNRC Convair Overview Explanation Examples 1 Overview 1 Overview Explanation Examples *...

  15. Shock compression of precompressed deuterium (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    VA at www.ntis.gov. Here we report quasi-isentropic dynamic compression and thermodynamic characterization of solid, precompressed deuterium over an ultrafast time scale (< 100 ps)...

  16. Superior Energy Performance: Certifying Increased Energy Productivity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Management Working Group (EMWG) Waterwastewater Des Moines, IA (2) Delta Diablo, CA Ithaca, NY Kent County, DE Victor Valley, CA Alexandria (VA) Renew ...

  17. Microsoft Word - L15 01-22 Uranium Tranfers

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Taxpayers Union 108 N. Alfred Street Alexandria, VA 22314 Subject: Request for ... actions, attests to the degree of gravity this situation carries for DOE and taxpayers. ...

  18. ICF International | Open Energy Information

    Open Energy Info (EERE)

    search Name: ICF International Address: 9300 Lee Highway, Fairfax, VA 22031-1207 USA Place: Washington, District of Columbia Year Founded: 1969 References: http:...

  19. The Nature Conservancy | Open Energy Information

    Open Energy Info (EERE)

    Conservancy Jump to: navigation, search Logo: The Nature Conservancy Name: The Nature Conservancy Address: 4245 North Fairfax Drive, Suite 100 Place: Arlington, VA Zip: 22203-1606...

  20. The Business Case for Fuel Cells 2012: America's Partner in Power

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... (CA) Eastern Municipal Water District - Moreno Valley & Perris Valley Regional Water ... (CA) Washington Gas (VA) Hospitals Stamford Hospital (CT) St. Francis Hospital (CT) St. ...

  1. State of the States: Fuel Cells in America 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... (CA) Eastern Municipal Water District - Moreno Valley & Perris Valley Regional Water ... (CA) Washington Gas (VA) Hospitals: Stamford Hospital (CT) St. Francis Hospital (CT) St. ...

  2. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... Facility, Newport News, VA (United States) US ... as propulsion and thermal control into the satellite ... integrates the propulsion system into a three-unit (3U) ...

  3. Deputy Secretary Poneman Addresses Nuclear Deterrence Summit...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addresses Nuclear Deterrence Summit Deputy Secretary Poneman Addresses Nuclear Deterrence Summit February 17, 2010 - 12:00am Addthis Alexandria, VA - U.S. Deputy Secretary of ...

  4. bib-aggregate | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Utilizing Spray Dryer Ash - Project Brief PDF-72KB Universal Aggregates, LLC, King George County, VA PROJECT FACT SHEET Commercial Demonstration of the Manufactured...

  5. SREL Reprint #3320

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Policy, George Mason University, Fairfax, VA 22030, USA 3Red Sea Research Center, King Abdullah University of Science and Technology, Thuwal, Saudi Arabia 4Southwest...

  6. Thomas Jefferson High School for Science & Technology Wins...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    School, Richmond, Takes Second NEWPORT NEWS, Va., Feb. 27, 2010 - The Thomas Jefferson High School for Science and Technology from Alexandria beat out St. Christopher's School...

  7. Thomas Jefferson High School for Science & Technology wins...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regional Science Bowl. Winning the daylong academic competition was the Thomas Jefferson High School for Science and Technology, from Alexandria, Va. Following in second place was...

  8. Vladimir Stoica

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Etalon", Phys. Rev. Lett. 110, 086109 (2013). Y. Li, V.A. Stoica, L. Endicott, G. Wang, C. Uher, and R. Clarke, "Coherent optical phonon spectroscopy studies of...

  9. Application Content and Evaluation Criteria/Process

    Broader source: Energy.gov [DOE]

    Presentation on Application Content and Evaluation Criteria/Process presented at the PEM fuel cell pre-solicitation meeting held May 26, 2005 in Arlington, VA.

  10. Top-Quark Decay at Next-to-Next-to-Leading Order in QCD (Journal...

    Office of Scientific and Technical Information (OSTI)

    National Technical Information Service, Springfield, VA at www.ntis.gov. Authors: Gao, Jun ; Southern Methodist U. ; Li, Chong Sheng ; Peking U. Peking U., CAPT Peking U. ;...

  11. brwtp-pfbc | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Appalacian Power Company, Roanoke, VA PROGRAM PUBLICATIONS AnnualQuarterly Technical Reports Clean Coal II - PFBC Utility Demonstration Project, 1992 Annual Report (Dec1992) ...

  12. Radiochemical tracers as a mix diagnostic for the ignition double...

    Office of Scientific and Technical Information (OSTI)

    Springfield, VA at www.ntis.gov. One of the most important challenges confronting laser-driven capsule implosion experiments will be a quantitative evaluation of the...

  13. Comments from the Sierra Club on the Department of Energy Emergency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operation at the Potomac River Generating Station in Alexandria, VA Comments from the Sierra Club on the Department of Energy Emergency Order to Resume Limited Operation at ...

  14. Comments on Emergency Order to Resume Limited Operation at the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. Comments on Emergency Order to Resume Limited Operation at the ...

  15. Other Participants 1992 | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    NM Shoreham-Wading River High School , Shoreham , NY Thomas Jefferson High School , Alexandria , VA Wheaton North High School , Wheaton , IL Window Rock High School , Fort Defiance

  16. Abacus Engineered Systems, Inc

    Office of Environmental Management (EM)

    Southland Energy, A Division of Southland Industries Aniello (Nello) Tortora Director of Federal Programs 22340 Dresden Street Suite 177 Dulles, VA 20166 P:...

  17. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    VA (United States) US Department of Energy, NE-75, Orbital Fairchild US Department of EnergyOffice of Legacy Management US Lattice Quantum Chromodynamics Collaboration (USQCD)...

  18. Experimental Study of Single Spin Asymmetries and TMDs (Conference...

    Office of Scientific and Technical Information (OSTI)

    Resource Relation: Journal Name: International Journal of Modern Physics: Conference Series; Journal Volume: 25; Conference: QCD Evolution 2013, Newport News, VA (United States), ...

  19. Mr. Robert C, Smith Federal Acquisition Service General Services...

    Energy Savers [EERE]

    Robert C, Smith Federal Acquisition Service General Services Administration 2200 Crystal Drive, Suite 300 Arlington, VA 20406 Dear Mr. Smith: The Department of Energy (DOE) will ...

  20. ARM Cloud Aerosol Precipitation Experiment (ACAPEX) Science Plan...

    Office of Scientific and Technical Information (OSTI)

    States) The Hebrew University of Jerusalem (Israel) Science and Technology Corporation (STC), Hampton, VA (United States) Colorado State Univ., Fort Collins, CO (United States) ...