1

Central Ferry Lower Monumental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Wind Projects Central Ferry Lower Monumental Transmission Line Project BPA will build a new 500-kilovolt (kV) transmission line from BPA's Central Ferry...

2

Central Ferry-Lower Monumental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Spacer Damper Replacement Program Wind Projects Central Ferry-Lower Monumental BPA will build a new 500-kilovolt (kV) transmission line from BPA's Central Ferry...

3

Microsoft Word - Central Ferry-Lower Monumental ROD.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 Record of Decision March 2011 Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Record of Decision March 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west

4

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

5

BPA, Transmission, I-5 Corridor Reinforcement Project Update...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

environmental impact statement (EIS) for our proposed I-5 Corridor Reinforcement Project. BPA is proposing to build a 500-kilovolt transmission line to reinforce the high-voltage...

6

BPA, Transmission, I-5 Corridor Reinforcement Project, presentation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 17 Factors we consider Electrical needs for...

7

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

8

Construction of Central Ferry-Lower Monumental Transmission Line...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

power line capabilities include transmission, overhead and underground distribution and substation projects. BPA also will be holding two "Meet the Builder" open-houses in late...

9

BPA, transmission, I-5 Corridor Reinforcement Project, letter...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

made to the PEP form and how they affect any rights you may or have granted. Background - BPA is proposing to build a 500-kilovolt transmission line and associated substations. The...

10

BPA, Transmission, I-5 Corridor Reinforcement Project, abbreviated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 9 Benefits of a new line Keeps the lights...

11

EIS-0422: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

12

EIS-0422: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to...

13

EIS-0332: McNary-John Day Transmission Line Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

14

EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

15

Microsoft Word - BPA DEIS TOC Abstract Summary.doc  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement July 2010 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Draft Environmental Impact Statement Bonneville Power Administration July 2010 Abstract DEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

16

Microsoft Word - BPA PFEIS Cover Abstract.doc  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement February 2011 DOE/EIS-0422 Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration February 2011 FEIS i Central Ferry - Lower Monumental 500-kilovolt Transmission Line Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agency: Washington Energy Facility Site Evaluation Council (EFSEC) Title of Proposed Project: Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, DOE/EIS - 0422 State Involved: Washington Abstract: BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would

17

EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

18

EIS-0422: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington. Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington, DOE/EIS-0422 (July 2010 - 75 FR 38517) More Documents & Publications EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft

19

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

20

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

22

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

23

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

422: Draft Environmental Impact Statement 422: Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

24

EIS-0091: Garrison-Spokane 500-kV Transmission Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

25

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

26

EIS-0231: Navajo Transmission Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

27

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

for New Transmission for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

28

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

Loan Guarantee for New Transmission Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

29

monument valley.cdr  

Office of Legacy Management (LM)

The Monument Valley processing site is located on the The Monument Valley processing site is located on the Navajo Nation in northeastern Arizona, about 15 miles south of Mexican Hat, Utah. A uranium-ore-processing mill operated at the site from 1955 to 1968 on property leased from the Navajo Nation. The mill closed in 1968, and control of the site reverted to the Navajo Nation. Most of the mill buildings were removed shortly thereafter. The milling process produced radioactive mill tailings, a predominantly sandy material. From 1955 until 1964, ore at the site was processed by mechanical milling using an upgrader, which crushed the ore and separated it by grain size. The finer-grained material, which was higher in uranium content, was shipped to other mills for chemical processing. Coarser-grained material was stored on site.

30

EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

31

EIS-0422: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision Record of Decision EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west through Garfield,

32

EIS-0422: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

422: Final Environmental Impact Statement 422: Final Environmental Impact Statement EIS-0422: Final Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA lines in the area. Two of the routing alternatives for the transmission line are about 38 miles long, and the other two are about 40 miles long.

33

EIS-0422: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0422: Final Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA lines in the area. Two of the routing alternatives for the transmission line are about 38 miles long, and the other two are about 40 miles long.

34

EIS-0421: Big Eddy-Knight Transmission Line | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21: Big Eddy-Knight Transmission Line 21: Big Eddy-Knight Transmission Line EIS-0421: Big Eddy-Knight Transmission Line Overview BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line would extend generally northeast from BPA's existing Big Eddy Substation in The Dalles, Oregon, to a new substation (Knight Substation) proposed to be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. The proposed Big Eddy Knight Transmission Project is needed to increase transmission capacity to respond to requests for transmission service in this area. Public Comment Opportunities No public comment opportunities available at this time.

35

Building a Better Transmission Tower | Department of Energy  

Energy Savers [EERE]

500-kilovolt tower one of hundreds on the McNary-John Day line saving BPA big bucks. | Photo courtesy of Bonneville Power Administration A helicopter hoists...

36

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Broader source: Energy.gov (indexed) [DOE]

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

37

monument valley.cdr  

Office of Legacy Management (LM)

The The Monument Valley Processing Site is located on the Navajo Nation in northeastern Arizona, about 15 miles south of Mexican Hat, Utah. A uranium-ore processing mill operated at the site from 1955 to 1968 on property leased from the Navajo Nation. The mill closed in 1968, and control of the site reverted to the Navajo Nation. Most of the mill buildings were removed shortly thereafter. The milling process produced radioactive mill tailings, a predominantly sandy material. From 1955 until 1964, ore at the site was processed by mechanical milling using an upgrader, which crushed the ore and separated it by grain size. The finer-grained material, which was higher in uranium content, was shipped to other mills for chemical processing. Coarser-grained material was stored on site. These source materials and other site-related contamination were removed during surface remediation at the

38

A Western Perspective on Energy: A Plea for Rational Energy Planning  

Science Journals Connector (OSTI)

...optimum use of substantial portions ofthe...suggest some changes in it. This...2. Draft EIS-The Energy...500 Kilovolt Transmission Lines and Asso-ciated...500 Kilovolt Transmission Lines and Associated...

Bill Christiansen; Theodore H. Clack Jr.

1976-11-05T23:59:59.000Z

39

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Broader source: Energy.gov (indexed) [DOE]

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

40

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

42

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

43

Monument Valley Phytoremediation Pilot Study:  

Office of Legacy Management (LM)

1.8 1.8 U.S. Department of Energy UMTRA Ground Water Project Monument Valley Ground Water Remediation Work Plan: Native Plant Farming and Phytoremediation Pilot Study August 1998 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Project Number UGW-511-0015-10-000 Document Number U0029501 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0029501 Contents DOE/Grand Junction Office Monument Valley Ground Water Remediation Work Plan August 1998 Page v Contents Page Acronyms .

44

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

45

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

46

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

47

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

48

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

49

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Broader source: Energy.gov (indexed) [DOE]

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

50

EIS-0325: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement EIS-0325: Final Environmental Impact Statement Schultz-Hanford Area Transmission Line Project BPA proposes to construct a new 500-kilovolt (kV) transmission...

51

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

52

Abstract  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reinforcement Project, DOEEIS - 0436 States Involved: Washington and Oregon Abstract: BPA is proposing to build a 500-kilovolt (kV) lattice-steel-tower transmission line that...

53

Ltr Sending NOI to Prepare EIS to Interested Parties  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

invites you to meetings where you can learn more and comment on the proposal. Proposal - BPA is proposing to construct a 500-kilovolt transmission line and associated substations....

54

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Journal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Washington BPA is evaluating potential routes for a proposed 500-kilovolt transmission line to reinforce the power grid in southwest Washington. The draft EIS is now...

55

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Journal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Washington BPA is evaluating potential routes for a proposed 500-kilovolt transmission line to reinforce the power grid in southwest Washington. The draft EIS scheduled...

56

Monument, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Monument, Colorado: Energy Resources Monument, Colorado: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.0916586°, -104.872758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.0916586,"lon":-104.872758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

57

Case Study - Statue of Liberty National Monument | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Statue of Liberty National Monument Statue of Liberty National Monument Case Study - Statue of Liberty National Monument October 7, 2013 - 1:58pm Addthis Overview This energy savings performance contract (ESPC) focuses on improvements to the infrastructure, with the addition of energy-efficient lighting, variable-speed drives, and installation of energy management control systems. The contractor, CES/Way, is investing $1 million, and the utility, Public Service Electric & Gas Company, will provide a rebate of $1.3 million. The potential energy savings resulting from this project are about 4 Billion Btu per year, about 75 percent of which will come from Ellis Island. Background Ellis Island and the nearby Liberty Island, site of the venerable Statue of Liberty, together form the Statue of Liberty National Monument. Ellis

58

IVAAIU urban instrument : hyper-complex civic monument for Seoul  

E-Print Network [OSTI]

This thesis aims to plan and design an urban monument in Seoul, Republic of Korea, that can reflect the political movement of the city at the urban area which has been historically associated with political representations ...

Lee, Donguk

2013-01-01T23:59:59.000Z

59

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

60

DOE - Office of Legacy Management -- Monument Valley Mill Site - AZ 0-01  

Office of Legacy Management (LM)

Monument Valley Mill Site - AZ 0-01 Monument Valley Mill Site - AZ 0-01 FUSRAP Considered Sites Site: Monument Valley Mill Site (AZ.0-01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monument Valley, Arizona, Processing Site Documents Related to Monument Valley Mill Site Data Validation Package for the June 2009 Water Sampling at the Monument Valley, Arizona, Processing Site; LMS/MON/S0609; October 2009 Natural and Enhanced Attenuation of Soil and Ground Water at Monument Valley, Arizona, and Shiprock, New Mexico 2006 Status Report June 2008 Data Validation Package for 2007 Groundwater Sampling at the Monument Valley, AZ Processing Site

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0414: EPA Notice of Availability of the Draft Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Energia Sierra Juarez U.S. Transmission Line Project, Construction, Operation, Maintenance, and Connection of either 230-kilovolt or a 500-kilovolt Electric Transmission Line Crossing U.S.-Mexico Border

62

Monument Beach, Massachusetts: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Monument Beach, Massachusetts: Energy Resources Monument Beach, Massachusetts: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.7195502°, -70.6119755° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.7195502,"lon":-70.6119755,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

63

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11 - 8120 of 9,640 results. 11 - 8120 of 9,640 results. Download EIS-0203: Record of Decision Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs http://energy.gov/nepa/downloads/eis-0203-record-decision Download EIS-0236: Record of Decision National Ignition Facility http://energy.gov/nepa/downloads/eis-0236-record-decision-1 Download EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program http://energy.gov/nepa/downloads/eis-0285-sa-126-supplement-analysis Download EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project http://energy.gov/nepa/downloads/eis-0422-mitigation-action-plan Download EIS-0200: Record of Decision (August 1998)

64

Chapter 1 Purpose of and Need for Action  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Acronyms. Chapter 1 Purpose of and Need for Action Bonneville Power Administration (BPA) is proposing to build a 500-kilovolt (kV) lattice-steel tower transmission line that...

65

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County...  

Broader source: Energy.gov (indexed) [DOE]

and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from...

66

Microsoft Word - 2011 March 11 ROD - Central Ferry-Lower Monumental...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

through Garfield, Columbia, and Walla Walla counties to BPA's existing Lower Monumental Substation in Walla Walla County, a distance of about 38 miles. Background BPA is a...

67

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

68

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 17770 of 28,905 results. 61 - 17770 of 28,905 results. Download CX-001844: Categorical Exclusion Determination Wister CX(s) Applied: B3.1, A9 Date: 04/23/2010 Location(s): Wister, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-001844-categorical-exclusion-determination Download EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project http://energy.gov/nepa/downloads/eis-0422-mitigation-action-plan Download Uranium Leasing Program Draft PEIS Public Comment Period Extended to May 31, 2013 Uranium Leasing Program Draft PEIS Public Comment Period Extended to May 31, 2013 http://energy.gov/lm/downloads/uranium-leasing-program-draft-peis-public-comment-period-extended-may-31-2013

69

Record of Decision (ROD) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 18, 2011 August 18, 2011 EIS-0240: Amended Record of Decision Disposition of Surplus Highly Enriched Uranium July 20, 2011 EIS-0387: Record of Decision Y-12 National Security Complex July 8, 2011 EIS-0380: Amended Record of Decision Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico April 18, 2011 EIS-0416: Record of Decision Issuance of Loan Guarantees to Solar Partners I, LLC, Solar Partners II, LLC, and Solar Partners VIII, LLC, for Ivanpah Solar Electric Generating System Units 1, 2, 3 March 11, 2011 EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project January 12, 2011 EIS-0407: Record of Decision Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas November 29, 2010

70

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

71 - 6780 of 26,764 results. 71 - 6780 of 26,764 results. Download What is Clean Cities?; Clean Cities Fact Sheet (September 2008 Update) http://energy.gov/downloads/what-clean-cities-clean-cities-fact-sheet-september-2008-update-0 Download EIS-0422: Final Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project http://energy.gov/nepa/downloads/eis-0422-final-environmental-impact-statement Download Leader Electronics: Noncompliance Determination (2010-SE-2301) DOE issued a Notice of Noncompliance Determination to Leader Electronics, Inc. finding that "NU50-2093400-I3(NU50-21090-300F)" and "MU03-F050040-A1(MU03-Fl050-AKOS)" of external power supplies do not comport with the energy conservation standards. http://energy.gov/gc/downloads/leader-electronics-noncompliance-determination-2010-se-2301

71

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

24, 2011 24, 2011 Chemical engineer Alan Zacher 10 Questions for a Chemical Engineer: Alan Zacher Chemical engineer Alan Zacher took some time to share advice for students interested in science and engineering and give us the download on his work developing propylene glycol from renewable sources. March 24, 2011 CX-005523: Categorical Exclusion Determination Washington-City-Bellevue CX(s) Applied: A9, A11, B5.1 Date: 03/24/2011 Location(s): Bellevue, Washington Office(s): Energy Efficiency and Renewable Energy March 22, 2011 EIS-0245-SA-03: Supplement Analysis Determination Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, WA March 22, 2011 EIS-0422: Notice of Availability of the Record of Decision Central Ferry to Lower Monumental 500-kilovolt Transmission Line Project

72

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11, 2011 11, 2011 EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project March 11, 2011 CX-005421: Categorical Exclusion Determination Ohop Underbuild Project CX(s) Applied: B4.6, B4.12 Date: 03/11/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 4, 2011 Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule RICHLAND, WASH. - Today's safe and successful explosive demolition at

73

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

74

A macrofossil analysis of materials recovered from Hovenweep National Monument, Cajon Mesa, Colorado and Utah  

E-Print Network [OSTI]

A MACROFOSSIL ANALYSIS OF MATERIALS RECOVERED FROM HOVENMEEP NATIONAL MONUMENT, CAJON MESA, COLORADO AND UTAH A Thesis by DONNA RUTH CHAPMAN Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement... for the degree of MASTER OF SCIENCE December 1979 Major Subject: Botany A MACROFOSSIL ANALYSIS OF MATERIALS RECOVERED FROM HOVENWEEP NATIONAL MONUMENT, CATION MESA, COLORADO AND UTAH A Thesis by DONNA RUTH CHAPMAN Approved as to style and content by...

Chapman, Donna Ruth

2012-06-07T23:59:59.000Z

75

Natural and Enhanced Attenuation of Soil and Groundwater at the Monument  

Broader source: Energy.gov (indexed) [DOE]

Natural and Enhanced Attenuation of Soil and Groundwater at the Natural and Enhanced Attenuation of Soil and Groundwater at the Monument Valley, Arizona, DOE Legacy Waste Site Natural and Enhanced Attenuation of Soil and Groundwater at the Monument Valley, Arizona, DOE Legacy Waste Site Paper presented at the Waste Management 2010 Conference. March 7 through March 10, 2010, Phoenix, Arizona. W.J.Waugh, D.E. Miller, S.A. Morris, L.R. Sheader, E.P. Glenn, D. Moore, K.C. Carroll, L. Benally, M. Roanhorse, R.P. Bush Natural and Enhanced Attenuation of Soil and Groundwater at the Monument Valley, Arizona, DOE Legacy Waste Site More Documents & Publications EA-1313: Final Environmental Assessment Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary

76

Intrasite motions and monument instabilities at Medicina ITRF co-location site  

Science Journals Connector (OSTI)

......Niemi N.A. Characterization of site-specific GPS errors using a short-baseline network of braced monuments at Yucca Mountain, southern Nevada. J. geophys. Res. (2009) 114:B11402. doi:10.1029/2008JB006027. Johnson H.O......

Pierguido Sarti; Claudio Abbondanza; Juliette Legrand; Carine Bruyninx; Luca Vittuari; Jim Ray

2013-01-01T23:59:59.000Z

77

A B C D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS  

E-Print Network [OSTI]

37 38 39 A B C D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS MDPT_DESC_1 DESC D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS IRMT_SCEJ_2 SCEJ_CAMI_1 SCEJ_PISG_1 Monument X Other Relevant Information (e.g., line size) ROW/Corridor Information 1 ROW no change X X X X 2

78

Construction of history : Mohammad-Reza Shah revivalism, nationalism, and monumental architecture of Tehran, 1951-1979  

E-Print Network [OSTI]

This Master's thesis focuses on modem Iranian national/revival architecture under the Pahlavi royal dynasty, in particular the reigning period of Mohammad-Reza Shah. I analyze and interpret three specific monuments: the ...

Der-Grigorian, Talin, 1972-

1998-01-01T23:59:59.000Z

79

Hacking the history in Budapest: public monuments as forms of an alternative messaging system  

Science Journals Connector (OSTI)

The paper aims to elaborate the question of how certain existing public monuments become surfaces of other artistic and non-artistic expressions. The very basic manifestation of these interventions is the 'usage' of public statues as spots of official and spontaneous celebration on the one hand, and their functionality as tourist sights on the other. Yet, the focus is on more rebellious examples: the paper analyses numerous actions that took place after the 1989 regime change and which radically reread particular monuments and memories. Through enumerating specific cases, the paper will show a segment of alternative visions concerning Hungarian memory politics: these, generally, private initiatives criticise official memory narratives and challenge top-down definitions of heritage. Since the argument is that these temporal projects, reaching deeply into the structure of the particular public works of art, are part of a Hungarian legacy, this investigation is also directed towards their preservation.

Júlia Székely

2013-01-01T23:59:59.000Z

80

EIS-0077-S: Bonneville Power Administration Crow Butte Slough Crossing  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this SEIS to evaluate potential impacts resulting from construction of a 4,700 -foot segment of the Ashe-Slatt transmission line at Crow Butte Slough, overhead on towers on the existing right-of-way. This SEIS is a supplement to DOE/EIS-0077, Ashe-Slatt (Pebble Springs) 500-kilovolt Transmission Line.

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

898 Federal Register / Vol. 74, No. 6 / Friday, January 9, 2009 / Notices the time needed to review instructions;  

E-Print Network [OSTI]

Transmission Line Project, Proposed Land Use Plan Amendment, Construction and Operation of a New 91-mile 500 kilovolt (kV) Electric Transmission Line from Imperial Valley Substation (in Imperial Co. near the City the continued use of routes in areas containing Naturally Occurring Asbestos and impacts to water quality

82

Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites  

SciTech Connect (OSTI)

The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

NONE

1995-10-01T23:59:59.000Z

83

MONUMENT VALLEY  

Office of Legacy Management (LM)

2 2 DATA PACKAGE CONTENTS This data package includes the following information: Item No. Description of Contents 1. Site Lead Summary. 2. Data Package Assessment, which includes the following: a. Field activities verification checklist. b. Confirmation that chain-of-custody was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validators findings. Suspected Anomalies Reports, generated by the UMTRA database system. This report compares the new data set with historical data and designates "suspected anomalies" based on the many criteria listed as footnotes on each page. In

84

MONUMENT VALLEY  

Office of Legacy Management (LM)

1998 1998 DATA PACKAGE CONTENTS This data package includes the following information: Item No. ~ e s c r i ~ t i o n of Contents 1. Site Hydrologist Summary 2. Data Package Assessment, which includes the following: a. Field procedures verification checklist b. Confirmation that chain-of-custody was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of the adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validators findings. Anomalous Data Review Checksheets which list the subset of data from sampling event that merits explanation or follow-up action. The "Disposition" column of this report describes the evaluators judgments on the

85

MONUMENT VALLEY  

Office of Legacy Management (LM)

2001 2001 DATA PACKAGE CONTENTS This data package includes the following information: Item No. Descrivtion of Contents 1. Site Hydrologist Summary 2. Data Package Assessment, which includes the following: a. Field procedures verification checklist b. Confirmation that chain-of-custody was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of the adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validators findings. Suspected Anomalies Reports generated by the UMTRA database system. This report compares the new data set with historical data and designates "suspected anomalies" based on the many criteria listed as footnotes on each

86

MONUMENT VALLEY  

Office of Legacy Management (LM)

0 0 DATA PACKAGE CONTENTS This data package includes the following information: Item No. Descrivtion of Contents 1. Site Hydrologist Summary 2. Data Package Assessment, which includes the following: a. Field procedures verification checklist b. Confirmation that chain-of-custody was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of the adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validator's findings. Suspected Anomalies Report (SAR) generated by the UMTRA database system. This report compares the new data set with historical data and designates "suspected anomalies" based on the many criteria listed as footnotes on each page.

87

MONUMENT VALLEY  

Office of Legacy Management (LM)

9 9 DATA PACKAGE CONTENTS This data package includes the following information: ItemNo. Description of Contents 1. Site Hydrologist Summary 2. Data Package Assessment, which includes the following: a. Field procedures verification checklist b. Confirmation that chain-of-custody was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of the adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validators findings. Suspected Anomalies Reports generated by the UhlTRA database system. This report compares the new data set with historical data and designates 'suspected anomalies" based on the many criteria listed as footnotes on each

88

MONUMENT VALLEY  

Office of Legacy Management (LM)

1 1 DATA PACKAGE CONTENTS This data package includes the following information: Item No. Description of Contents 1 . Site Hydrologist Summary 2. Data Package Assessment, which includes the following: a. Field procedures verification checklist b. Confirmation that chain-of-custodv was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of the adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validator's findings. Suspected Anomalies Report (SAR) generated by the UMTRA database system. This report compares the new data set with historical data and designates "suspected anomalies" based on the many criteria listed as footnotes on each page.

89

MONUMENT VALLEY  

Office of Legacy Management (LM)

8 8 DATA PACKAGE CONTENTS This data package includes the following information: Ikmm. 1; Site Sampling.Lead Summary 2. Data Package Assessment, which includes the following: a. Field procedures verification checklist b. Confirmation that chain-of-custody was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of the adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validators f i n d i n g s . Anomalous Data Review Checksheets which list the subset of Jata &om sampling event that merits explanation or follow-up action. The "disposition" column of this report describes the evaluators judgments on the listed anomalies.

90

CX-009197: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

91

EIS-0296: South Oregon Coast Reinforcement Project, Coos Bay/North Bend, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area.

92

EA-1937: Pacific Direct Intertie Upgrade Project; Lake, Jefferson, Crook, Deschutes, and Wasco Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA that assesses the potential environmental impacts of a proposal to replace equipment at BPAs Celilo converter station and upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from The Dalles, Oregon, to the Nevada-Oregon border.

93

EIS-0443: Project Financing for Southwest Intertie Project- South, Clark, Lincoln, Nye, and White Pine Counties, Nevada  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line.

94

EIS-0060: Bonneville Power Administration Proposed FY 1981 Program  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 78 existing substations.

95

Mercedes Volait Surveying monuments in Egypt: the work of Emile Prisse d'Avennes (1807-1879)  

E-Print Network [OSTI]

Mercedes Volait Surveying monuments in Egypt: the work of Emile Prisse d'Avennes (1807-1879) Lecture at the General Consulate of Egypt in Djeddah, 30 November 2013 The antiquarian work of the French orientalist Emile Prisse d'Avennes in Egypt can be, and has been, analysed through his notorious illustrated

Paris-Sud XI, Université de

96

C:\WINNT\Profiles\caseys\DESKTOP\L T R C\PICs Program\Permanent Markers\monument survey.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monument Survey Monument Survey Waste Isolation Pilot Plant Carlsbad, New Mexico August 31, 2000 Contractor Report Permanent Markers Monument Survey Waste Isolation Pilot Plant Carlsbad, New Mexico August 31, 2000 Prepared for: Westinghouse Government Environmental Services Company Waste Isolation Division P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 i John Hart and Associates, P.A. Table of Contents 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Related DOE Commitments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Study Objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.0 Survey Rationale and Methods . . . . . . . . . . . . . . . . . . . . . . . . .

97

Transmission Investment: A Primer  

SciTech Connect (OSTI)

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

98

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

99

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

100

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

102

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

103

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

104

CX-001944: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

44: Categorical Exclusion Determination 44: Categorical Exclusion Determination CX-001944: Categorical Exclusion Determination Replace Spacer Dampers Along the Grizzly - Captain Jack No. 1 500 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/21/2010 Location(s): Crook County, Oregon Office(s): Bonneville Power Administration In order to provide continued system reliability, Bonneville Power Administration (BPA) proposes to replace old and worn spacer dampers along approximately 113.1 miles of Grizzly - Captain Jack No. 1 500 kilovolt transmission line. Manned aerial carts that ride on the transmission line conductors will be used to change out the spacers. The carts will be placed on the transmission line by a helicopter before the line crews access the carts to perform the work. New spacers will be flown to the carts and

105

CX-003611: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Categorical Exclusion Determination 1: Categorical Exclusion Determination CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) has a need to replace old and worn spacer-dampers on approximately 78 miles of the Schultz - Raver Number 3 and 4 500-kilovolt (kV) transmission lines. Manned aerial carts that ride on the transmission line conductors would be used to change out the spacers. The carts would be placed on the transmission line by helicopter prior to line crews accessing the carts to perform the work. New spacers would be delivered by helicopter to the carts. Once the old spacers are

106

CX-001185: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85: Categorical Exclusion Determination 85: Categorical Exclusion Determination CX-001185: Categorical Exclusion Determination Replace Spacer Dampers Along the Wautoma-Rock Creek Number 1 500 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/03/2010 Location(s): Benton County, Yakima County, Office(s): Bonneville Power Administration In order to provide continued system reliability, Bonneville Power Administration (BPA) proposes to replace old and worn spacer dampers along approximately 65.1 miles of Wautoma Rock Creek Number 1 500 kilovolt Transmission Line. Manned aerial carts that ride on the transmission line conductors will be used to change out the spacers. The carts will be placed on the transmission line by a helicopter before the line crews access the carts to perform the work. New spacers will be flown to the carts and

107

DOE/EA-1313: Environmental Assessment of Ground Water Compliance at the Monument Valley, Arizona, Uranium Mill Tailings Site (03/22/05)  

Broader source: Energy.gov (indexed) [DOE]

DOE/EA-1313 DOE/EA-1313 Rev. 0 Environmental Assessment of Ground Water Compliance at the Monument Valley, Arizona, Uranium Mill Tailings Site Final March 2005 Prepared by U.S. Department of Energy Office of Legacy Management Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Document Number U0069700 This Page Intentionally Blank DOE Office of Legacy Management EA of Ground Water Compliance at the Monument Valley Site March 2005 Final Page iii Contents Page Acronyms and Abbreviations ....................................................................................................... vii Executive Summary.......................................................................................................................

108

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

109

CX-004258: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

58: Categorical Exclusion Determination 58: Categorical Exclusion Determination CX-004258: Categorical Exclusion Determination Replace Spacer Dampers Along the Ostrander-McLaughlin Number 1 500-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/29/2010 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) has a need to replace old and worn spacer dampers on the Ostrander-McLaughlin Number 1 500-kilovolt transmission line (approximately 9 miles). Spacer replacement is a routine maintenance activity conducted from manned aerial carts placed on the transmission line conductor either by helicopter or line truck. First, carts would be placed on the conductor; crews would then access the carts to perform the work. Once changed out, old spacers would be transported to

110

CX-004257: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

57: Categorical Exclusion Determination 57: Categorical Exclusion Determination CX-004257: Categorical Exclusion Determination Replace Spacer Dampers Along the Slatt-John Day Number 1 500-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 10/04/2010 Location(s): Sherman County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) needs to replace old and worn conductor spacers along 30.3 miles of the Slatt-John Day Number 1 500-kilovolt transmission line. Spacer replacement is a routine maintenance activity conducted from manned aerial carts placed on the transmission line conductor either by helicopter or line truck. Crews then access the carts to perform the work. Once changed out, old spacers would be transported to a pickup area before being sent to a recycling center. Minimal ground

111

CX-004256: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

56: Categorical Exclusion Determination 56: Categorical Exclusion Determination CX-004256: Categorical Exclusion Determination Replace Spacer Dampers Along the Dworshak PH-Dworshak Number 1 500-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 10/05/2010 Location(s): Clearwater County, Idaho Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) needs to replace old and worn spacer dampers along the Dworshak PH-Dworshak Number 1 500-kilovolt transmission line (3.7 miles). Spacer replacement is a routine maintenance activity conducted from manned aerial carts placed on the transmission line conductor either by helicopter or line truck. Crews then access the carts to perform the work. Once changed out, old spacers would be transported to a pickup area before being sent to a recycling center. Minimal ground

112

CX-004255: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

255: Categorical Exclusion Determination 255: Categorical Exclusion Determination CX-004255: Categorical Exclusion Determination Replace Spacer Dampers Along the Chief Joseph PH-Chief Joseph Number 6 500-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 10/05/2010 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) has a need to replace old and worn spacer dampers along the Chief Joseph PH-Chief Joseph Number 6 500-kilovolt transmission line (0.7 miles). Spacer replacement is a routine maintenance activity conducted from manned aerial carts placed on the transmission line conductor either by helicopter or line truck. Crews then access the carts to perform the work. Once changed out, old spacers would be transported to a pickup area before being sent to a recycling center. Minimal ground

113

Microsoft Word - GrandCoulee_FinalEA_CommentResponses.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1679 December 2011 Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project Revision Sheet for the Environmental Assessment 2 SUMMARY This revision sheet documents the changes to be incorporated into the Grand Coulee's Third Powerplant 500-kilovolt (kV) Transmission Line Replacement Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On May 2, 2011, the Preliminary EA was sent to agencies and interested parties.

114

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

115

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

116

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

117

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

118

Transmission Utilization Group (TUG)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

119

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

120

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

122

Baseline risk assessment for groundwater contamination at the uranium mill tailings site near Monument Valley, Arizona. Draft  

SciTech Connect (OSTI)

This baseline risk assessment evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site near Monument Valley, Arizona. The tailings and other contaminated material at this site are being relocated and stabilized in a disposal cell at Mexican Hat, Utah, through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The tailings removal is planned for completion by spring 1994. After the tailings are removed, groundwater contamination at the site will continue to be evaluated. This risk assessment is the first document specific to this site for the Groundwater Project. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site.

Not Available

1993-09-01T23:59:59.000Z

123

Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1  

SciTech Connect (OSTI)

This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site`s tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site.

Not Available

1994-08-01T23:59:59.000Z

124

CX-003787: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

87: Categorical Exclusion Determination 87: Categorical Exclusion Determination CX-003787: Categorical Exclusion Determination John Day-Big Eddy Number 2 500-Kilovolt Transmission Line Reconductor CX(s) Applied: B4.6 Date: 09/07/2010 Location(s): Sherman County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to reconductor 3 approximately 1-mile long sections of the John Day-Big Eddy Number 2 500-kilovolt transmission line. The project involves removing the existing conductor from the John Day Substation Dead End to tower 2/1, from tower 9/4 to tower 10/1, and from tower 18/4 to Big Eddy Substation Dead End and replacing it with the upgraded conductor. Additional work includes replacement of conductor hardware, replacement of insulators, installation

125

Natural and Enhanced Attenuation of Soil and Groundwater at the Monument Valley, Arizona, DOE Legacy Waste Site10281  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), the Navajo Nation, and the University of Arizona are exploring natural and enhanced attenuation remedies for groundwater contamination at a former uranium-ore processing site near Monument Valley, Arizona. DOE removed radioactive tailings from the Monument Valley site in 1994. Nitrate and ammonium, waste products of the milling process, remain in an alluvial groundwater plume spreading from the soil source where tailings were removed. Planting and irrigating two native shrubs, fourwing saltbush and black greasewood, markedly reduced both nitrate and ammonium in the source area over an 8-year period. Total nitrogen dropped from 350 mg/kg in 2000 to less than 200 mg/kg in 2008. Most of the reduction is attributable to irrigation-enhanced microbial denitrification rather than plant uptake. However, soil moisture and percolation flux monitoring show that the plantings control the soil water balance in the source area, preventing additional leaching of nitrogen compounds. Enhanced denitrification and phytoremediation also look promising for plume remediation. Microcosm experiments, nitrogen isotopic fractionation analysis, and solute transport modeling results suggest that (1) up to 70 percent of nitrate in the plume has been lost through natural denitrification since the mill was closed in 1968, and (2) injection of ethanol may accelerate microbial denitrification in plume hot spots. A field-scale ethanol injection pilot study is underway. Landscape-scale remote sensing methods developed for the project suggest that transpiration from restored native phreatophyte populations rooted in the aquifer could limit further expansion of the plume. An evaluation of landfarm phytoremediation, the irrigation of native shrub plantings with high nitrate water pumped from the alluvial aquifer, is also underway.

Waugh, W.J. [S.M. Stoller Corporation, Grand Junction, CO; Miller, D.E. [S.M. Stoller Corporation, Grand Junction, CO; Morris, S.A. [S.M. Stoller Corporation, Grand Junction, CO; Sheader, L.R. [S.M. Stoller Corporation, Grand Junction, CO; Glenn, E.P. [University of Arizona, Tucson, AZ; Moore, D. [University of Arizona, Tucson, AZ; Carroll, K.C. [University of Arizona, Tucson, AZ; Benally, L. [Navajo Nation, Window Rock, AZ; Roanhorse, M. [Navajo Nation, Window Rock, AZ; Bush, R.P. [U.S. Department of Energy, Grand Junction, CO; none,

2010-03-07T23:59:59.000Z

126

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

127

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

128

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

129

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

130

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

131

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

132

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 9190 of 29,416 results. 81 - 9190 of 29,416 results. Download CX-006302: Categorical Exclusion Determination Colville-Republic Rebuild Project CX(s) Applied: B1.3, B4.6 Date: 07/21/2011 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-006302-categorical-exclusion-determination Download CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-003611-categorical-exclusion-determination Download CX-004257: Categorical Exclusion Determination Replace Spacer Dampers Along the Slatt-John Day Number 1 500-Kilovolt

133

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

134

Transmission Access Resources  

Broader source: Energy.gov [DOE]

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

135

Performance Incentives for Transmission  

E-Print Network [OSTI]

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

136

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

137

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

138

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

139

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

140

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

142

Open Access Transmission Tariff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

143

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

144

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

145

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

146

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

147

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

148

Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards.

NONE

1996-03-01T23:59:59.000Z

149

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

150

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

151

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

152

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

153

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

154

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

155

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

156

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

157

Continuously variable transmission  

SciTech Connect (OSTI)

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

158

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

159

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

160

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Transmission Developers Inc.  

Broader source: Energy.gov (indexed) [DOE]

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

162

Transmission Siting_071508.indd  

Broader source: Energy.gov (indexed) [DOE]

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

163

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

164

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand interconnection capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

165

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

166

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

167

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

168

MONUMENT VALLEY, ARIZONA  

Office of Legacy Management (LM)

VALLEY, ARIZONA VALLEY, ARIZONA Sampled August 1997 DATA PACKAGE CONTENTS This data package includes the following information: Item No. Descriotion of Contents 1. Site Sampling Lead Summary 2. Data Package Assessment, which includes the following: a. Field procedures verification checklist b. Confirmation that chain-of-custody was maintained. c. Confirmation that holding time requirements were met. d. Evaluation of the adequacy of the QC sample results. Data Assessment Summary, which describes problems identified in the data validation process and summarizes the validator's findings. Suspected Anomalies Reports generated by the UMTRA database system. This report compares the new data $et with historical data and designates "suspected anomalies" based on the many criteria listed as footnotes on each page. In

169

monument valley.cdr  

Office of Legacy Management (LM)

is occurring in the plume. Additionally, modeling suggests that the injection of ethanol as a substrate for denitrification could substantially increase denitrification rates...

170

Usurpation of Monuments  

E-Print Network [OSTI]

to decipher the initial text. Plaster used anciently to maskhave been suppressed with plaster before the final one wasRamesses VI re-inscribed it. Plaster used to mask one of the

Brand, Peter

2010-01-01T23:59:59.000Z

171

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

172

NREL: Transmission Grid Integration - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

173

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

174

Transmission Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

175

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

176

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

177

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

178

National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

179

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

180

Dynamic Transmission Electron Microscopy  

SciTech Connect (OSTI)

Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

2012-10-12T23:59:59.000Z

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Broader source: Energy.gov [DOE]

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

182

Transmission Reliability | Department of Energy  

Energy Savers [EERE]

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

183

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

184

Chapter 4 Transmission Adequacy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

185

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

186

Hydrogen Transmission and Distribution Workshop  

Broader source: Energy.gov [DOE]

Proceedings from the Hydrogen Transmission and Distribution Workshop held February 25-26, 2014, in Golden, Colorado. The objective was to discuss and share information on the research, development, and demonstration needs and challenges for low-cost, effective hydrogen transmission and distribution from centralized production facilities to the point of use.

187

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

188

Transmission Reliability | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

189

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

190

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

191

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions  

Broader source: Energy.gov [DOE]

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

192

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); analyze the potential within the district to utilize farm wastes to produce biofuels; enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; identify the policy, regulatory, and financial barriers impeding development of a new energy system; and improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the Colleges yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

193

SunShot Initiative: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

194

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

195

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

196

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

197

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

198

Video transmission over wireless networks  

E-Print Network [OSTI]

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

199

National Electric Transmission Congestion Studies  

Broader source: Energy.gov [DOE]

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

200

National Transmission Grid Study: 2002  

Broader source: Energy.gov [DOE]

National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

OpenEI Community - transmission  

Open Energy Info (EERE)

black out brown out bulk power system electricity grid future grid grid history security Smart Grid transmission Smart Grid Fri, 31 Oct 2014 17:58:14 +0000 Dc 955 at...

202

Negative differential transmission in graphene  

Science Journals Connector (OSTI)

By using the Kubo linear response theory with the Keldysh Green function approach, we investigate the mechanism leading to the negative differential transmission in a system with the equilibrium electron density much smaller than the photon-excited one. It is shown that the negative differential transmission can appear at low probe-photon energy (in the order of the scattering rate) or at high energy (much larger than the scattering rate). For the low probe-photon energy case, the negative differential transmission is found to come from the increase of the intraband conductivity due to the large variation of electron distribution after the pumping. As for the high probe-photon energy case, the negative differential transmission is shown to tend to appear with the hot-electron temperature being closer to the equilibrium one and the chemical potential higher than the equilibrium one but considerably smaller than half of the probe-photon energy. We also show that this negative differential transmission can come from both the inter- and the intraband components of the conductivity. Especially, for the interband component, its contribution to the negative differential transmission is shown to come from both the Hartree-Fock self-energy and the scattering. Furthermore, the influence of the Coulomb-hole self-energy is also addressed.

B. Y. Sun and M. W. Wu

2013-12-17T23:59:59.000Z

203

DOE Transmission Capacity Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

204

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION | Department...  

Broader source: Energy.gov (indexed) [DOE]

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

205

Briefing Memo: Petroleum Product Transmission & Distribution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Briefing Memo: Petroleum Product Transmission & Distribution Briefing Memo: Petroleum Product Transmission & Distribution Click below to download a PDF of the briefing memo....

206

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

207

Agenda: Natural Gas: Transmission, Storage and Distribution ...  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas: Transmission, Storage and Distribution Agenda: Natural Gas: Transmission, Storage and Distribution A Public Meeting on the Quadrennial Energy Review, Hosted by the...

208

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

209

National Electric Transmission Congestion Study | Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

210

2009 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

211

Electric Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Electric Transmission SitingLegal Abstract Electric Transmission Siting at the California...

212

2006 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

213

National Electric Transmission Congestion Study Workshops | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

214

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

215

Agenda: Electricity Transmission and Distribution - East | Department...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission and Distribution - East Agenda: Electricity Transmission and Distribution - East A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

216

Agenda: Electricity Transmission, Storage and Distribution -...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission, Storage and Distribution - West Agenda: Electricity Transmission, Storage and Distribution - West A Public Meeting on the Quadrennial Energy Review,...

217

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

218

Directly correlated transmission electron microscopy and atom...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

219

Career Map: Power Systems/Transmission Engineer  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

220

DOE Transmission System Integration Workshop  

Broader source: Energy.gov (indexed) [DOE]

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

222

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

223

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

224

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

225

Power superconducting power transmission cable  

DOE Patents [OSTI]

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

226

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

227

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

228

NREL: Transmission Grid Integration - Webinars  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

229

DOE Electricity Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

230

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

231

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

232

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

233

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

234

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

235

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission...

236

Ebola virus transmission in guinea pigs  

Science Journals Connector (OSTI)

...Rights Reserved. 2014 research-article Ebola virus transmission in guinea pigs Gary...School of Medicine, Philadelphia, PA, USA Ebola virus (EBOV) transmission is currently...movement over short distances. Importance Ebola is generally thought to be spread between...

Gary Wong; Xiangguo Qiu; Jason S. Richardson; Todd Cutts; Brad Collignon; Jason Gren; Jenna Aviles; Carissa Embury-Hyatt; Gary P. Kobinger

2014-11-12T23:59:59.000Z

237

MagLab - Transmission Lines Tutorial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

238

Transmission Issues and Power Exchanges in Texas  

E-Print Network [OSTI]

on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult...

Hughes, H. L.

239

Vibration Transmission through Symmetric Resonant Couplings  

Science Journals Connector (OSTI)

15 March 1994 research-article Vibration Transmission through Symmetric Resonant Couplings D. J. Allwright...Blakemore P. R. Brazier-Smith J. Woodhouse The transmission of vibration through a symmetric junction is considered. The problem is...

1994-01-01T23:59:59.000Z

240

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EIS-0344: Draft Envrionmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Draft Envrionmental Impact Statement 4: Draft Envrionmental Impact Statement EIS-0344: Draft Envrionmental Impact Statement Grand Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project. Bonnewille Power Administration (BPA) would construct a new 500-kilovolt (kV) transmission line that would replace a single-circuit 115-kV transmission line in an exisiting corridor that has multiple transmission lines for most of the project's length. The transmission line would extend between the Grand Coulee 600-kV Switchyard and Bell Substation near Spokane, a distance of 84 miles. Detailed information about the project and its environmental impacts

242

EEI/DOE Transmission Capacity Report  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

243

Mountain States Transmission Intertie (MSTI) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

244

Sandia National Laboratories: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure Security, Modeling, Modeling & Analysis, News, News & Events, Renewable Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia...

245

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: Develop a simulation environment for integrating transmission and distribution control, Construct reduced-order controllable models for smart grid assets at the distribution level, Design and validate closed-loop control strategies for distributed smart grid assets, and Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

246

BPA, Electric Transmission Overview, October 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

247

The real problem with Merchant transmission  

SciTech Connect (OSTI)

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

248

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network [OSTI]

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

249

Fact #802: November 4, 2013 Market Share by Transmission Type...  

Energy Savers [EERE]

2: November 4, 2013 Market Share by Transmission Type Fact 802: November 4, 2013 Market Share by Transmission Type The variety of transmission technologies has increased as...

250

Western-UGP Transmission and Ancillary Services Rates Customer...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

80 Percentage of transmission plant included in UMZ Rates (line 79 line 76) TP 1.00000 TRANSMISSION EXPENSES 81 Total transmission expenses (sum lines 41 to 43,...

251

RAPID/BulkTransmission/About | Open Energy Information  

Open Energy Info (EERE)

Contribute Contact Us About Bulk Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry...

252

RAPID/Geothermal/Transmission Siting & Interconnection/Nevada...  

Open Energy Info (EERE)

Siting Agency: Public Utilities Commission of Nevada Transmission Siting Transmission lines over 200 kV are handled by the state's CPCN process. Siting of transmission lines with...

253

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

254

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

255

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

256

Relativistic tunneling and accelerated transmission  

E-Print Network [OSTI]

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

257

FPL's Christmas 1991 transmission outages  

SciTech Connect (OSTI)

A record number of contamination related outages occurred on FPL transmission lines during Christmas of 1991 and resulted in an investigation of inservice insulator performance. The field investigation process used was enhanced by recent improvements in outage data recording. Also used in the analysis were weather information, the results of recently completed accelerated aging tests of polymers, and specially conducted tests on the effects of weathering steel stain on porcelain insulators. Specific insulator problems were identified and actions taken to reduce the possibility of recurrence.

Burnham, J.T.; Busch, D.W.; Renowden, J.D. (Florida Power Light Co., Juno Beach, FL (United States). Transmission Line Dept.)

1993-10-01T23:59:59.000Z

258

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

259

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

260

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

262

Open Access Transmission and Renewable Energy Technologies  

SciTech Connect (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

263

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

large, but conceptual, transmission lines such as the C/PNW-very conceptual transmission lines that resemble radialand voltage of transmission lines added in the study, as

Wiser, Ryan

2014-01-01T23:59:59.000Z

264

Department of Energy Offers Conditional Commitment for a Loan Guarantee for  

Broader source: Energy.gov (indexed) [DOE]

a Loan a Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Offers Conditional Commitment for a Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest October 19, 2010 - 12:00am Addthis Washington, D.C. -- The U.S. Department of Energy today announced the offer of a conditional commitment for a $350 million loan guarantee to develop the One Nevada Transmission Line (ON Line), the first transmission line project to be offered a conditional commitment by the Loan Programs Office of the Department of Energy. ON Line consists of a new 500 kilovolt (kV) AC transmission line that will run 235 miles from Ely, Nevada to just north of Las Vegas, with a new substation located at the northern end of the line.

265

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

wind with transmission alternative 7b (500 kV AC line fromkV line CAISO - A4 Central California Clean Energy TransmissionTransmission Line: Transmission Development Facilities Application Volume One MATL New 230 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

266

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

267

Magnetically insulated transmission line oscillator  

DOE Patents [OSTI]

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

268

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

269

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

270

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

271

Regional Transmission Planning Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

272

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

273

Transmission Electron Microscope and Scanning Electron Microscopes -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

274

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Broader source: Energy.gov [DOE]

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

275

NREL: Transmission Grid Integration - Research Staff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

276

RRTT - Rapid Response Team for Transmission  

Broader source: Energy.gov (indexed) [DOE]

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

277

Richard Shaheen named Senior VP of Transmission  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and operational accomplishments that will serve BPA well as we continue to strengthen our safety culture, sustain our core transmission assets and modernize our electric grid."...

278

Category:NEPA Transmission | Open Energy Information  

Open Energy Info (EERE)

Pages in category "NEPA Transmission" This category contains only the following page. T TransWest Retrieved from "http:en.openei.orgwindex.php?titleCategory:NEPATransmiss...

279

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network [OSTI]

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the (more)

Malathi, V

2014-01-01T23:59:59.000Z

280

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Natural Gas Transmission and Distribution Module  

U.S. Energy Information Administration (EIA) Indexed Site

31, 2012, Washington, DC Major assumption changes for AEO2013 Oil and Gas Working Group Natural Gas Transmission and Distribution Module DRAFT WORKING GROUP PRESENTATION DO NOT...

282

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

283

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

284

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives for Hydrogen Delivery Workshop May 7- 8, 2003 U.S. Department of Energy Hydrogen, Fuel Cells,...

285

Nevada Transmission Siting Information | Open Energy Information  

Open Energy Info (EERE)

Siting Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Transmission Siting...

286

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

mittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah...

287

Webinar: Understanding the Interconnection and Transmission Service...  

Broader source: Energy.gov (indexed) [DOE]

Tribal Energy Sufficiency and Economic Development U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study U.S....

288

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

289

Electricity Transmission, A Primer | Open Energy Information  

Open Energy Info (EERE)

A Primer Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Electricity Transmission, A Primer Authors Matthew H. Brown, National Conference of State...

290

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

291

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

292

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers [EERE]

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

293

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

294

Crews repair transmission lines after Washington wildfire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

295

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

296

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Din Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

297

EIS-0317: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

7: EPA Notice of Availability of the Draft Environmental 7: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement Kangley-Echo Lake Transmission Line Project Notice of availability of the Kangley-Echo Lake Transmission Line Project construction of a new 500 kilovolt (kV) transmission line draft environmental impact statement supplement with updated information on the reevaluating alternative not analyzed, COE Section 10 and Permits, King County, WA. Environmental Protection Agency Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement, DOE/EIS-0317 (January 2003) (68 FR 1458) More Documents & Publications EIS-0386: EPA Notice of Availability of the Programmatic Final

298

Microsoft Word - Big Eddy ROD.doc  

Broader source: Energy.gov (indexed) [DOE]

Administration's Administration's Big Eddy-Knight Transmission Project Record of Decision September 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. As described in the Big Eddy-Knight Transmission Project Final Environmental Impact Statement (EIS) (DOE/EIS-0421, July 2011), this project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA's existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that will be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. For the

299

EA-1470: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Finding of No Significant Impact 0: Finding of No Significant Impact EA-1470: Finding of No Significant Impact Harry Allen-Mead 500 kV Transmission Line Project, Nevada Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). Based on the EA, BLM, and Western errata, Western has determined that the proposed transmission line would not result in any significant environmental impacts, and the preparation of an environmental impact statement (EIS) will not be required. Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project, DOE/EA-1470 (October 2004)

300

Comments of New England Electric Transmission Corporation on Proposed Open  

Broader source: Energy.gov (indexed) [DOE]

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

302

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

303

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

304

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

305

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

306

Transmission line protection based on travelling waves  

Science Journals Connector (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

307

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

308

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network [OSTI]

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

309

Physics of information representation, transmission and processing  

Science Journals Connector (OSTI)

The paper presents the theory of physical model of information representation, transmission and processing together with their features which yield into introduction of classical and quantum informatics principles. These features are mathematically described ... Keywords: information physics, information representation, quantum informatics, transmission and processing

Miroslav Svtek

2009-11-01T23:59:59.000Z

310

Ecological benefits of dc power transmission  

SciTech Connect (OSTI)

The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

Kutuzova, N. B. [JSC 'NIIPT' (Russian Federation)

2011-05-15T23:59:59.000Z

311

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network [OSTI]

Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap compression to fusion conditions Magnetic field of at least 5 T in a closed-field line topology Density ~ 1017

312

Coordination of Federal Authorizations for Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

313

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

314

CX-007990: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Exclusion Determination CX-007990: Categorical Exclusion Determination Pearl Substation 500-Kilovolt 6 Bay Addition CX(s) Applied: B4.6 Date: 02132012 Location(s):...

315

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

its intention to explore building a 500-kilovolt line between Castle Rock, Wash., and Troutdale, Ore., the announcement created understandable public concern. To ensure we have...

316

CRSP Transmission Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

317

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

318

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

319

EIS-0414: EPA Notice of Availability of a Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

a Final Environmental a Final Environmental Impact Statement EIS-0414: EPA Notice of Availability of a Final Environmental Impact Statement Energia Sierra Juarez Transmission Project EPA announces the availability of the Final Environmental Impact Statement for the Energia Sierra Juarez Transmission Project. The proposal includes construction, operation, maintenance, and connection of either 230-Kilovolt or a 500-Kilovolt Electric Transmission Line Crossing U.S.-Mexico Border, Presidential Permit Approval, San Diego County, CA. Review Period Ends: 07/09/2012. EIS-0414-EPANOA-FEIS-2012.pdf More Documents & Publications EIS-0427: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0391: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0413: EPA Notice of Availability of a

320

CX-001183: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-001183: Categorical Exclusion Determination Replace Rock Creek-John Day Number 1 Spacers CX(s) Applied: B1.3 Date: 03/09/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration In order to provide continued system reliability, Bonneville Power Administration (BPA) proposes to replace old and worn spacers along approximately 8.7 miles of the Rock Creek-John Day Number 1 500 kilovolt transmission line; structures III to 4/2 and 6/4 to 11/2. Manned aerial carts that ride on the transmission line conductor would be used to change out the spacers. The carts would be placed on the transmission line by helicopter prior to line crews accessing the carts. New spacers would be flown to the carts and delivered by helicopter. Once the old spacers arc

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0421: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

: Record of Decision : Record of Decision EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington For more information contact: Ms. Stacy Mason, Environmental Coordinator Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-5455 Electronic mail: slmason@bpa.gov BPA has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. This project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA?s existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4

322

CX-005131: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31: Categorical Exclusion Determination 31: Categorical Exclusion Determination CX-005131: Categorical Exclusion Determination Spacer-Damper Replacements on the Captain Jack-Malin 500-kilovolt Transmission Line CX(s) Applied: B1.3 Date: 01/24/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) needs to replace old and worn conductor spacers on the Captain Jack-Malin transmission line to ensure the continued safe and reliable operation of this critical line. The line easements cross approximately 8 miles of high dessert terrain through Bureau of Land Management and private lands. All activities will be performed on the transmission line conductors by the Redmond line maintenance crews using a line truck. All vehicles will be restricted to

323

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

324

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Broader source: Energy.gov (indexed) [DOE]

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

325

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Broader source: Energy.gov (indexed) [DOE]

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

326

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

327

EIS-0325: EPA Notice of Availability of the Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

25: EPA Notice of Availability of the Final Environmental 25: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0325: EPA Notice of Availability of the Final Environmental Impact Statement Schultz-Hanford Transmission Line Project New 500 kilovolt (kV) Transmission Line Construction, Central Washington, north of Hanford connecting to existing line at the Schultz Substation, Kittitas, Yakima, Grant, and Benton Counties, Washington U.S. Environmental Protection Agency Environmental Impact Statements; Notice of Availability of the Schultz-Hanford Transmission Line Project Final Environmental Impact Statement, DOE/EIS-0325 (January 2003) (68 FR 5019) More Documents & Publications EIS-0318: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0323: EPA Notice of Availability of the Final

328

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electrical Interconnection of the Windy Point Wind Energy Project Electrical Interconnection of the Windy Point Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS.1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the

329

EIS-0231: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. EIS-0231-DEIS-1996.pdf More Documents & Publications EA-1470: Final Environmental Assessment EIS-0256: Final Environmental Impact Statement

330

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

21: EPA Notice of Availability of the Draft Environmental 21: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

331

Instrument Series: Microscopy Environmental Transmission Electron Microscope  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Transmission Environmental Transmission Electron Microscope EMSL's environmental transmission electron microscope (ETEM) provides in situ capabilities that enable atomic-resolution imaging and spectroscopic studies of materials under dynamic operating conditions. In contrast to traditional operation of TEM under high vacuum, EMSL's ETEM uniquely allows imaging within high- temperature and gas environments-with a gas pressure up to 20 Torr. With a spherical aberration corrector for the objective lens, the ETEM captures atomic-level processes as they occur, enabling vital research across a range of scientific fields. Research Applications Chemical science and engineering - providing in situ observation of catalytic processes with atomic-level resolution Materials science and engineering - allowing

332

Electricity Transmission Pricing: How Contracts Must Reflect Costs  

Science Journals Connector (OSTI)

This article sets out the main design elements of contracts for use of a transmission system and the basic methods of transmission pricing. It considers two methods of pricing transmission: top-down and bot...

Graham Shuttleworth

1996-01-01T23:59:59.000Z

333

Spatially and polarization resolved plasmon mediated transmission through continuous metal  

E-Print Network [OSTI]

Spatially and polarization resolved plasmon mediated transmission through continuous metal films Y transmission through an embedded undulated continuous thin metal film under normal incidence. 1D undulations resolved, polarization independent transmission. Whereas the needed submicron microstructure lends itself

Boyer, Edmond

334

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

335

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques ?lie Cartan, Université Henri Poincaré

336

Virulence, parasite mode of transmission, and host fluctuating asymmetry  

Science Journals Connector (OSTI)

...they provide a potential route for vertical transmission (Hembree & Ryan 1982...the horizontalvertical transmission sequence. Dashed lines indicate the horizontal...aeg pti depends on the transmission route of its parasite Edha ardia...

1997-01-01T23:59:59.000Z

337

Introduction. Cultural transmission and the evolution of human behaviour  

Science Journals Connector (OSTI)

...some promising lines of development...learning|cultural transmission|cultural evolution...illustration of cultural transmission delivering improved...efficient over transmission events, in line with the notion...two different routes: repeated interaction...

2008-01-01T23:59:59.000Z

338

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

339

Geothermal/Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Transmission < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Transmission General Regulatory Roadmap NEPA (5) The Geysers power plant showing condensers being retrofitted with direct contact condensers (DCCs). The DCCs were designed by NREL researchers working with Calpine Corporation for improved efficiency. With a 750-megawatt output from 14 units, the Geysers is the largest producer of geothermal power in the world. Geothermal power plants are located very close to the geothermal resource because the hot water/steam would cool down before reaching the power plant, unlike a natural gas plant which pipe gas hundreds or even thousands

340

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel...

342

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes This article is a...

343

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

344

Transmission line modeling with explicit grounding representation  

Science Journals Connector (OSTI)

This paper presents a new model of an overhead transmission line for electromagnetic transient computations. The unique feature of the model is the explicit representation of the tower grounding configuration and terminal substation grounds. Other properties of the model are: (1) accurate frequency dependent parameter representation from DC to several MHz; (2) explicit modeling of line asymmetries; and (3) high numerical efficiency. The model implementation is based on the solution of the transmission line differential equations resulting in a set of step response functions, forming a matrix. The step response matrix is utilized in a time domain simulation of electric power networks by a linear convolution scheme. The transmission line model is validated with actual system test data. The model is useful for computing the ground potential rise of transmission towers due to lightning or switching surges, insulation stress, etc. Typical applications are described in the paper.

G.J. Cokkinides; A.P.Sakis Meliopoulos

1988-01-01T23:59:59.000Z

345

2014 Transmission Reliability Program Peer Review  

Broader source: Energy.gov [DOE]

The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is available to download.

346

RAPID/Geothermal/Transmission Siting & Interconnection | Open...  

Open Energy Info (EERE)

in California California Energy Commission, California Energy Commission In California, transmission lines set to operate with a voltage between 50 kV and 200 kV must...

347

Transmission Policy in the United States  

E-Print Network [OSTI]

Market Design (SMD) proposal. PJMs market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERCs RTO and SMD visions....

Joskow, Paul

2006-03-14T23:59:59.000Z

348

National Electric Transmission Congestion Studies | Department...  

Energy Savers [EERE]

of the line or by operational directives that are created and enforced to protect the security and reliability of the grid. The term "transmission constraint" can refer to a...

349

National Electric Transmission Congestion Study- Portland Workshop  

Broader source: Energy.gov [DOE]

On December 13, 2011, DOE hosted a regional pre-study workshop in Portland, OR to receive input and suggestions concerning the National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below.

350

Executive Forum on Solutions to Transmission Investment  

E-Print Network [OSTI]

d'Hydro-Québec (IREQ) ISO New England Korea Electric Power Research Institute Michigan Electric. Business and Economics Small Groups ........................................................10 B. Planning and Transmission Investment Policy Small Groups ......................10 C. Technology Small Groups

351

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

Zip: 33408 Product: Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC line from West Texas to DallasFort...

352

Neuromotor Transmissibility of Horizontal Seatpan Vibration  

E-Print Network [OSTI]

Exposure to occupational whole body vibration (WBV) is associated with low back pain disorders, musculoskeletal disorders, and degeneration of spine. Transmission of vibration to the neuromotor system may play a role in the etiology...

Channamallu, Raghu Ram

2007-12-16T23:59:59.000Z

353

Data transmission element for downhole drilling components  

DOE Patents [OSTI]

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

354

Gila to North Gila Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

355

Synthesis of Lumped Transmission-Line Analogs  

E-Print Network [OSTI]

Transmission lines and their lumped approximating networks have long been incorporated into radio-frequency power amplifiers to improve efficiency and shape circuit waveforms and are beginning to perform a similar roles ...

Phinney, Joshua W.

356

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operate, maintain and decommission the TransWest Express 600-kV Direct Current Transmission Project. TransWest Express, LLC is a whollyowned subsidiary of the Anschutz...

357

Electric Power Generation and Transmission (Iowa)  

Broader source: Energy.gov [DOE]

Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

358

1 Introduction Danish transmission system operator  

E-Print Network [OSTI]

a new 400 kV transmission line between the cities Aarhus and Aalborg, app 90 km. This line at the 150 kV transmission level and intended to be used at 400 kV more than just for this line. Can of the dynamic behavior of a shunt reactor compensated 400 kV combined cable/overhead line. This is accomplished

Bak, Claus Leth

359

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Broader source: Energy.gov (indexed) [DOE]

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

360

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

2009 Electric Transmission Congestion Study | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

362

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Broader source: Energy.gov (indexed) [DOE]

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

363

RAPID/BulkTransmission/General Construction | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionGeneral Construction < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit...

364

QER Public Meeting in New Orleans, LA: Petroleum Product Transmission...  

Energy Savers [EERE]

Orleans, LA: Petroleum Product Transmission & Distribution QER Public Meeting in New Orleans, LA: Petroleum Product Transmission & Distribution Meeting Date and Location: May 27,...

365

OAHU Wind Integration And Transmission Study: Summary Report...  

Office of Environmental Management (EM)

OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

366

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

367

In-situ Transmission Electron Microscopy and Spectroscopy Studies...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Electron Microscopy and Spectroscopy Studies of Interfaces in Li-ion Batteries: Challenges and In-situ Transmission Electron Microscopy and Spectroscopy Studies of...

368

QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution Meeting Date and...

369

RAPID/BulkTransmission/Land Access | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us RAPID Bulk Transmission Land Access Regulatory...

370

2006 National Electric Transmission Congestion Study and Related...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion...

371

Draft National Electric Transmission Congestion Study Now Available...  

Broader source: Energy.gov (indexed) [DOE]

Draft National Electric Transmission Congestion Study Now Available for Public Comment Draft National Electric Transmission Congestion Study Now Available for Public Comment August...

372

Plan to Conduct Electric Transmission Congestion Study: Federal...  

Broader source: Energy.gov (indexed) [DOE]

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

373

RAPID/BulkTransmission/Siting/New Mexico | Open Energy Information  

Open Energy Info (EERE)

Solar Resources Contribute Contact Us RAPID Bulk Transmission Siting New Mexico Bulk Transmission Siting in New Mexico Regulatory Information Overviews Search for...

374

RAPID/BulkTransmission/Siting/California | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Resources Contribute Contact Us RAPID Bulk Transmission Siting California Bulk...

375

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Pipping of GH2 Pipeline....

376

RAPID/BulkTransmission/Air Quality | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionAir Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About...

377

California/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

do not have siting authority for transmission facilities. Print PDF Retrieved from "http:en.openei.orgwindex.php?titleCaliforniaTransmissionLocalRegulations&oldid68832...

378

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers [EERE]

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

379

RAPID/Overview/BulkTransmission/Siting/Colorado | Open Energy...  

Open Energy Info (EERE)

Colorado < RAPID | Overview | BulkTransmission | Siting(Redirected from RAPIDAtlasBulkTransmissionSitingColorado) Redirect page Jump to: navigation, search REDIRECT...

380

Transmission/Resource Library/Enviromental Resources and Mitigation...  

Open Energy Info (EERE)

Enviromental Resources and Mitigation < Transmission | Resource Library(Redirected from TransmissionResource LibraryMitigation) Redirect page Jump to: navigation, search...

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Steps to Establish a Real-Time Transmission Monitoring System...  

Broader source: Energy.gov (indexed) [DOE]

that must be taken to establish a system to make available to all transmission owners and Regional Transmission Organizations (RTOs) within the Eastern and Western Interconnections...

382

QER Public Meeting in Portland, OR: Electricity Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Portland, OR: Electricity Transmission, Storage and Distribution - West QER Public Meeting in Portland, OR: Electricity Transmission, Storage and Distribution - West Meeting Date...

383

QER Public Meeting in Newark, NJ: Electricity Transmission and...  

Energy Savers [EERE]

Newark, NJ: Electricity Transmission and Distribution - East QER Public Meeting in Newark, NJ: Electricity Transmission and Distribution - East New Jersey Institute of Technology...

384

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Broader source: Energy.gov (indexed) [DOE]

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

385

An Introduction to Electric Power Transmission | Open Energy...  

Open Energy Info (EERE)

An Introduction to Electric Power Transmission Abstract An introduction to transmission lines including topics: electricity generation and delivery, ownership and funding, anatomy...

386

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

387

Request for Information on Permitting of Transmission Lines:...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

388

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy Savers [EERE]

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

389

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers [EERE]

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

390

Amended Notice of Intent for the Northern Pass Transmission Line...  

Broader source: Energy.gov (indexed) [DOE]

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

391

EA-1982: Parker-Davis Transmission System Programmatic Operations...  

Energy Savers [EERE]

on Western's Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance...

392

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Broader source: Energy.gov (indexed) [DOE]

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

393

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Broader source: Energy.gov (indexed) [DOE]

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

394

RAPID/BulkTransmission/Water Quality | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionWater Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About...

395

RAPID/BulkTransmission/Water Use | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionWater Use < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk...

396

BPA, Transmission, I-5 Corridor Project, data by segments and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

alternatives for new transmission system facilities, including the new transmission line and substations proposed for the I-5 Corridor Reinforcement Project. Foremost is...

397

2009 Electric Transmission Congestion Study | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

398

RAPID/BulkTransmission/Power Plant | Open Energy Information  

Open Energy Info (EERE)

BulkTransmissionPower Plant < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk...

399

An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.  

SciTech Connect (OSTI)

References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

Litzenberger, Wayne; Lava, Val

1994-08-01T23:59:59.000Z

400

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

Mills, Andrew D.

2009-01-01T23:59:59.000Z

402

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Planning (Xcel). 2006. Wind Integration Study Report OfTransmission Vision for Wind Integration. White Paper.Charles Smith (Utility Wind Integration Group), Lynn Coles (

Mills, Andrew D.

2009-01-01T23:59:59.000Z

403

Abstract --The need to determine adequate regulations in the transmission activity in deregulated environments does not  

E-Print Network [OSTI]

be followed. Index Terms--Transmission expansion, Transmission planning, Transmission systems, Transmission pricing, Open access. I INTRODUCTION he presence of economies of scale and the specificity

Dixon, Juan

404

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions- Dataset  

Broader source: Energy.gov [DOE]

Excel file with dataset for Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

405

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Journal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Project Project Overview Map 0 2 4 6 8 10 1 Miles BPA Transmission Line * BPA Substation " Federal Dam Central Ferry-Lower Monumental Transmission Line County...

406

Olympia-Grand Coulee No. 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission...

407

Microsoft Word - CX-Hatwai-DworshakSpacerReplacementFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

September 24, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Proposed Action: 2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: The proposed Hatwai-Dworshak No. 1 500-kV transmission line project is located in Clearwater and Nez Perce counties, Idaho, in BPA's Spokane Operations and Maintenance District. Townships, Ranges, and Sections crossed by the proposed project are listed Table 1:

408

EIS-0443: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Record of Decision 3: Record of Decision EIS-0443: Record of Decision Project Financing for Southwest Intertie Project - South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near Ely, Nevada. Partial financing of SWlP-South is being considered under the provisions of Western's Transmission Infrastructure Program. Final Environmental Impact Statement Project Financing for Southwest Intertie Project - South, DOE/EIS-0443 (January 2010)

409

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343) (08/20/04)  

Broader source: Energy.gov (indexed) [DOE]

COB Energy Facility COB Energy Facility DECISION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the COB Energy Facility with the Federal Columbia River Transmission System (FCRTS), as proposed in the COB Energy Facility Final Environmental Impact Statement (FEIS) (DOE/EIS-0343, June 2004). Proposed by Peoples Energy Resources Company (PERC), the COB Energy Facility involves constructing and operating a new 1,160- megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 50.6-acre site near Bonanza in Klamath County, Oregon, and a 7.2-mile-long 500-kilovolt (kV) transmission line south to BPA's Captain Jack Substation. A Generation Interconnection Agreement with PERC would provide for interconnection of the COB Energy Facility with the FCRTS and

410

EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

6: Notice of Intent to Prepare an Environmental Impact 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement South Oregon Coast Reinforcement Project, Coos Bay, North Bend, Oregon Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area. This plant would require a peak load of 150 megawatts (MW) and an instantaneous peak of 225 MW. The existing transmission system to the area does not have the capacity to serve this potential load and other anticipated load growth on the south coast of Oregon. This project will

411

EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

6: Notice of Intent to Prepare an Environmental Impact 6: Notice of Intent to Prepare an Environmental Impact Statement EIS-0296: Notice of Intent to Prepare an Environmental Impact Statement South Oregon Coast Reinforcement Project, Coos Bay, North Bend, Oregon Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area. This plant would require a peak load of 150 megawatts (MW) and an instantaneous peak of 225 MW. The existing transmission system to the area does not have the capacity to serve this potential load and other anticipated load growth on the south coast of Oregon. This project will

412

Record of Decision for the Electrical Interconnection of the Plymouth Generating Facility (DOE/EIS-0345)(10/14/03)  

Broader source: Energy.gov (indexed) [DOE]

for the Electrical Interconnection of the Plymouth Generating Facility October 2003 THE DECISION The Bonneville Power Administration (BPA) has decided to implement the proposed action identified in the Plymouth Generating Facility (PGF) Final Environmental Impact Statement (FEIS) (DOE/EIS-0345, June 2003). The PGF, which has been proposed by Plymouth Energy, LLC (Plymouth Energy), involves construction and operation of a 307-megawatt (MW) natural gas-fired, combined-cycle power generation facility on a 44.5-acre site 2 miles west of Plymouth in Benton County, Washington. Under the proposed action, BPA will offer contract terms for interconnection of the PGF into the Federal Columbia River Transmission System (FCRTS) at BPA's proposed McNary-John Day 500-kilovolt (kV) transmission line at a point approximately

413

CX-007361: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

361: Categorical Exclusion Determination 361: Categorical Exclusion Determination CX-007361: Categorical Exclusion Determination Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace worn spacers along 69 miles of the Ashe-Marion No. 2 500-kilovolt Double Circuit Transmission Line (Structures 1/1 to 69/1). Work would be conducted on energized lines using live-line and bare-hand techniques as well as standard techniques requiring an outage. Spacers, which are located at various points along the conductor between transmission line towers, would be accessed using manned aerial line carts placed on the conductor either by a specialized heavily insulated line truck (178' Bronto), a standard

414

Microsoft Word - CX-Pearl-Marion-Tower-6-2-Replace_FY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Pearl-Marion No.1 Tower 6/2 replacement project PP&A Project No.: PP&A 2147, WO# 00296634, Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Canby, Clackamas County, Oregon Township 3 South, Range 1 East, Section 19 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace a single tower (6/2) on the existing Pearl-Marion No. 1 500-kilovolt (kV) transmission line. Tower 6/2 is located along the Molalla River where natural river channel movement and continued stream bank erosion

415

EIS-0443: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Final Environmental Impact Statement 3: Final Environmental Impact Statement EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near Ely, Nevada. Partial financing of SWlP-South is being considered under the provisions of Western's Transmission Infrastructure Program. Final Environmental Impact Statement Project Financing for Southwest Intertie Project - South, DOE/EIS-0443 (January 2010)

416

California | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 7, 2010 EIS-0414: EPA Notice of Availability of the Draft Environmental Impact Statement Energia Sierra Juarez U.S. Transmission Line Project, Construction, Operation, Maintenance, and Connection of either 230-kilovolt or a 500-kilovolt Electric Transmission Line Crossing U.S.-Mexico Border September 17, 2010 CX-004009: Categorical Exclusion Determination Field Demonstration of Carbon Dioxide Capture from Coal-Derived Syngas CX(s) Applied: B3.6, B5.1 Date: 09/17/2010 Location(s): Menlo Park, California Office(s): Energy Efficiency and Renewable Energy September 17, 2010 CX-003797: Categorical Exclusion Determination Recovery Act: San Bernardino Associated Government Natural Gas Truck Project - Alternative Fueling Station in Rancho Cucamonga, California CX(s) Applied: B5.1

417

CX-001414: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

414: Categorical Exclusion Determination 414: Categorical Exclusion Determination CX-001414: Categorical Exclusion Determination Coyote Springs-Slatt #1: Spacer Damper Replacements CX(s) Applied: B1.3 Date: 04/12/2010 Location(s): Gilliam County, Oregon Office(s): Bonneville Power Administration In order to provide continued system reliability, Bonneville Power Administration proposes to replace old and worn spacer dampers along approximately 28.1 miles of Coyote Springs-Slatt # 1 500-kilovolt transmission line. Manned aerial carts that ride on the transmission line conductors will be used to change out the spacers. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-001414.pdf More Documents & Publications CX-001944: Categorical Exclusion Determination CX-004257: Categorical Exclusion Determination CX-002532

418

Microsoft Word - CX-Monroe-Custer-AR-FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

August 26, 2013 August 26, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Darin Bowman Civil Engineer - TELF-TPP-3 Proposed Action: Access road and landing improvements on Bonneville Power Administration's (BPA) Monroe-Custer No. 2 transmission line PP&A Project No.: 2748 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance/custodial services for buildings, structures, infrastructures, equipment Location: Skagit and Snohomish counties, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to conduct access road improvements along selected areas of the Monroe-Custer No. 2, 500-kilovolt transmission line right-of-way (ROW). Specifically, work will take place between structures 10/3 to 11/2 and structures 45/5

419

CX-001180: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1180: Categorical Exclusion Determination 1180: Categorical Exclusion Determination CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace an existing dilapidated bridge across Little Pilchuck Creek, install three culverts in drainage ditches near the bridge, and repair 2,000 feet of existing on and off right-of-way (ROW) access roads along mile 16 of the Monroe-Custer Number 1 and Number 2 transmission Lines. Project work includes: excavation for bridge removal and installation, grading and shaping of roads, placing

420

A FRAMEWORK FOR TRANSMISSION CONGESTION MANAGEMENT ANALYSIS MINGHAI LIU  

E-Print Network [OSTI]

markets introduces uncertainty in the LMPs and consequently, in transmission pricing. In order to protect

Gross, George

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Colorado/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission < Colorado Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Colorado is part of the Western Interconnection power grid, which covers most of the western United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the

422

Wind Energy Transmission | Open Energy Information  

Open Energy Info (EERE)

Wind Energy Transmission Wind Energy Transmission Jump to: navigation, search Just a few years ago, 5% wind energy penetration in the United States was a lofty goal. In Europe, however, some countries have already reached wind energy penetrations of 10% or higher in a short period of time. The growth of domestic wind generation over the past decade has sharpened the focus on two questions: Can the electrical grid accommodate very high amounts of wind energy without jeopardizing security or degrading reliability? And, given that the nation's current transmission infrastructure is already constraining further development of wind generation in some regions, how could significantly larger amounts of wind energy be developed? The answers to these questions could hold the keys to determining how much of a role

423

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

424

Idaho/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Idaho/Transmission < Idaho Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Idaho is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). It includes the provinces of Alberta and British Columbia, the northern portion of Baja California, Mexico, and all or portions of the 14 Western states between.

425

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 129 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled

426

2012 National Electric Transmission Congestion Study - Philadelphia  

Broader source: Energy.gov (indexed) [DOE]

Philadelphia Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops.pdf 12-06-11 Congestion Workshop Agenda - Philadelphia (final).pdf Introduction by David Meyer, DOE.pdf Presentation by Edward Finley, NCUC.pdf Presentation by Betty Ann Kane, DC PSC.pdf Presentation by Robert Bradish, American Electric Power.pdf Presentation by John Buechler, NYISO.pdf Presentation by Jim Busbin, Southern Company.pdf

427

Arizona/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Arizona/Transmission < Arizona Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Arizona is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including Arizona. WECC

428

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

This This page inTenTionally lefT blank 127 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the

429

Washington/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Washington/Transmission < Washington Jump to: navigation, search WashingtonTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Washington is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC's service territory extends from Canada to Mexico. It includes the provinces of Alberta and British Columbia, the northern portion of Baja California,

430

Montana/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Montana/Transmission < Montana Jump to: navigation, search MontanaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Montana is part of both the Eastern and Western Interconnection power grids and is part of two NERC regions - the Midwest Reliability Organization (MRO) and Western Electricity Coordinating Council (WECC). MRO's service territory extends from the state of Nebraska north to

431

Transmission Infrastructure: FERCs Role  

U.S. Energy Information Administration (EIA) Indexed Site

Transmission Incentives Transmission Incentives Transmission Incentives P. Kumar Agarwal P. Kumar Agarwal Acting Director, Division of Reliability & Acting Director, Division of Reliability & Engineering Services Engineering Services Federal Energy Regulatory Commission Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration U.S. DOE, Energy Information Administration 2009 Energy Conference 2009 Energy Conference Washington, DC Washington, DC April 7, 2009 April 7, 2009 2 2 History History   Energy Policy Act of 2005, August 5, Energy Policy Act of 2005, August 5, 2005 2005 - - Created FPA Section 219 Created FPA Section 219   FERC issued order No. 679 on July 20, FERC issued order No. 679 on July 20, 2006 adopting regulations to promote 2006 adopting regulations to promote

432

Downhole transmission system comprising a coaxial capacitor  

DOE Patents [OSTI]

A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Johnson, Monte L. (Orem, UT); Bartholomew, David B. (Springville, UT); Hall, Jr., H. Tracy (Provo, UT); Rawle, Michael (Springville, UT)

2011-05-24T23:59:59.000Z

433

Data transmission system with distributed microprocessors  

DOE Patents [OSTI]

A data transmission system having a common request line and a special request line in addition to a transmission line. The special request line has priority over the common request line. A plurality of node stations are multi-drop connected to the transmission line. Among the node stations, a supervising station is connected to the special request line and takes precedence over other slave stations to become a master station. The master station collects data from the slave stations. The station connected to the common request line can assign a master control function to any station requesting to be assigned the master control function within a short period of time. Each station has an auto response control circuit. The master station automatically collects data by the auto response controlling circuit independently of the microprocessors of the slave stations.

Nambu, Shigeo (Fuchu, JP)

1985-01-01T23:59:59.000Z

434

A transmission calibration method for superconducting resonators  

E-Print Network [OSTI]

A method is proposed and experimentally explored for \\textit{in-situ} calibration of complex transmission data for superconducting microwave resonators. This cryogenic calibration method accounts for the instrumental transmission response between the vector network analyzer reference plane and the device calibration plane. Once calibrated, the observed resonator response was modeled in detail by two approaches. The first, a phenomenological model based on physically realizable rational functions, enables the extraction of multiple resonance frequencies and widths for coupled resonators without explicit specification of the circuit network. In the second, an ABCD-matrix representation for the distributed transmission line circuit is used to model the observed response from the characteristic impedance and propagation constant. When used in conjunction with electromagnetic simulations, the kinetic inductance fraction can be determined with this method with an accuracy of 2%. Datasets for superconducting microst...

Cataldo, Giuseppe; Barrentine, Emily M; Brown, Ari D; Moseley, Samuel H; U-Yen, Kongpop

2014-01-01T23:59:59.000Z

435

Single transmission line data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

436

Transmission/Nepa Database | Open Energy Information  

Open Energy Info (EERE)

Nepa Database Nepa Database < Transmission Jump to: navigation, search NepaHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Document Collections (1) Have a NEPA Document Collection to add that doesn't yet exist in this collection? Make sure it doesn't already exist: Please be sure to search this page by serial number and by document number Add.png Add a new NEPA Document Collection This query has been included to allow you to use the black arrows in the table header cells to sort the table data. Document Name Serial Number Analysis Type Transmission Type Project Area Applicant Lead Agency District Office Project Phase(s) TransWest EIS 600kV Wyoming Western Power Administration BLM BLM Wyoming State Office

437

Oregon/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Oregon/Transmission < Oregon Jump to: navigation, search OregonTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Idaho is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC's service territory extends from Canada to Mexico. It includes the provinces of Alberta and British Columbia, the northern portion of Baja California,

438

Utah/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Utah/Transmission < Utah Jump to: navigation, search UtahTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Utah is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC includes the provinces of Alberta and British Columbia, the northern portion of Baja California, Mexico, and all or portions of the 14 Western states between.

439

Nevada/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Nevada/Transmission < Nevada Jump to: navigation, search NevadaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Nevada is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in Nevada.

440

Definition: Advanced Transmission Applications | Open Energy Information  

Open Energy Info (EERE)

Applications Applications Jump to: navigation, search Dictionary.png Advanced Transmission Applications Software that utilizes synchrophasor information for real-time grid operations or planning and off-line analysis. These applications are aimed at providing wide-area situational awareness, grid monitoring, and detailed power system analysis and the improvement or validation of power system models.[1] Related Terms smart grid References ↑ https://www.smartgrid.gov/category/technology/advanced_transmission_applications [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssustainability, |Template:BASEPAGENAME]]sustainability, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Advanced_Transmission_Applications&oldid=502495

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

February 20, 2003 February 20, 2003 EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program February 19, 2003 EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-125: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-124: Supplement Analysis Transmission System Vegetation Management Program February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 16, 2003 EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program December 24, 2002

442

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Transmission_Company_LLC_Smart_Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

443

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

July 19, 2002 July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 9, 2002 EIS-0285-SA-81: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-80: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-78: Supplement Analysis Transmission System Vegetation Management Program June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis

444

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

445

Electric Transmission Lines (Nebraska) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

446

Synchronized Andreev transmission in SNS junction arrays.  

SciTech Connect (OSTI)

We construct a nonequilibrium theory for the charge transfer through a diffusive array of alternating normal (N) and superconducting (S) islands comprising an SNSNS junction, with the size of the central S island being smaller than the energy relaxation length. We demonstrate that in the nonequilibrium regime the central island acts as Andreev retransmitter with the Andreev conversions at both NS interfaces of the central island correlated via above-the-gap transmission and Andreev reflection. This results in a synchronized transmission at certain resonant voltages which in experiments is seen as a sequence of spikes in the differential conductivity.

Chtchelkatchev, N. M.; Baturina, T. I.; Glatz, A.; Vinokur, V. M.; Materials Science Division; Russian Academy of Sciences; Moscow Inst. of Physics and Technology; Inst. Semiconductor Physics

2010-07-29T23:59:59.000Z

447

Optimizing Storages for Transmission System Operation  

Science Journals Connector (OSTI)

Abstract A growing amount of congestions is expected for future operation of electrical transmission grids in Europe. Within this context, storages can be used to assist transmission system operators in daily operation and to avoid costly redispatch measures. In this paper, a research methodology to evaluate impact and interdependencies between market operation of storages and participation in redispatch measures is presented. Furthermore, a methodology for the evaluation of benefits by storages solely administrated by TSO is introduced. The methods are evaluated in a case study for the German electricity system in the year 2020.

Jonas Eickmann; Tim Drees; Jens D. Sprey; Albert Moser

2014-01-01T23:59:59.000Z

448

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

449

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

nearest transmission system substation, and are derived fromthe nearest transmission substation, the capacity factor of

Mills, Andrew D

2011-01-01T23:59:59.000Z

450

Transmission grid access and pricing in Norway, Spain, and California: A comparative study  

E-Print Network [OSTI]

incentives given by transmission pricing form the foundationhas focussed on transmission pricing, monopoly regulation,

Gronli, Helle; Gomez San Ramon, Tomas; Marnay, Chris

1999-01-01T23:59:59.000Z

451

Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator  

Broader source: Energy.gov [DOE]

Supplemental comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission...

452

A neutron transmission study of environmental Gd  

E-Print Network [OSTI]

A new method for the determination of environmental Gd by neutron transmission (NT) experiments is proposed. The NT method is based on the measurements of neutron spectra passing through a target. From the attenuation neutron spectra new data as concentration, width, resonance energies and cross section have been obtained.

Cristiana Oprea; Ioan Alexandru Oprea; Alexandru Mihul

2014-06-02T23:59:59.000Z

453

How Financial Transmission Rights Curb Market Power  

E-Print Network [OSTI]

PWP-049 How Financial Transmission Rights Curb Market Power Steven Stoft June 1997 This paper is part of the working papers series of the Program on Workable Energy Regulation (POWER). POWER is a program of the University of California Energy Institute, a multicampus research unit of the University

California at Berkeley. University of

454

Methods and systems for micro transmissions  

DOE Patents [OSTI]

Methods and systems for micro transmissions for a micro machine may comprise an input shaft assembly coupled to a micro actuator, an output shaft assembly coupled to a micro shaft, and one or more power conversion elements operable to convert a first type of movement from the micro actuator into a second, disparate type of movement for the micro shaft.

Stalford, Harold L

2014-12-23T23:59:59.000Z

455

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

456

Efficient Spectral Methods for Transmission Eigenvalues and ...  

E-Print Network [OSTI]

Mar 20, 2014 ... scattering obstacle can be recovered by using the measured scattering data and the ... method reduces the problem to a sequence of one-dimensional transmission eigenvalue ...... Next, we define the following interface basis functions ... problem can be efficiently solved by using a standard procedure [10].

2014-03-24T23:59:59.000Z

457

A numerical tool for transmission lines  

Science Journals Connector (OSTI)

The electric line numerical study is usually made through a harmonic approach with the impedance concept based on the Finite Difference discretization in both the time and space domains. These methods present severe drawbacks when used in impulse working ... Keywords: differential system, finite element method, impulse voltage, stiff time problem, transmission line

Herv Bolvin; Andr Chambarel; Philippe Neveux

2005-05-01T23:59:59.000Z

458

1 Introduction Danish transmission system operator  

E-Print Network [OSTI]

400 kV transmission line between the cities Aarhus and Aalborg, app. 90 km. This line is constructed reactor compensated 400 kV combined cable/overhead line. This is accomplished by means of theoretical-phase autoreclosure ARC in such a combined cable/OHL line. Keywords -- 400 kV cable, single-phase autoreclosure, shunt

Bak, Claus Leth

459

HVDC transmission: a path to the future?  

SciTech Connect (OSTI)

Direct current transmission has been the poor stepchild of the U.S. electric industry. Although early-generation plants were based on DC technology, it was soon deemed uneconomical to transmit electricity over long distances, but it now appears poised for a change. Both the increasing technical potential and changing economics of HVDC lines promise a growing role in the future. (author)

Teichler, Stephen L.; Levitine, Ilia

2010-05-15T23:59:59.000Z

460

Definition: Transmission Angle and Frequency Monitoring | Open Energy  

Open Energy Info (EERE)

Transmission Angle and Frequency Monitoring Transmission Angle and Frequency Monitoring Jump to: navigation, search Dictionary.png Transmission Angle and Frequency Monitoring An advanced transmission application that uses angle and frequency measurements from PMUs to indicate loss of generation or other disturbances causing a change in the supply/demand balance.[1] Related Terms transmission lines, advanced transmission applications, transmission line References ↑ https://www.smartgrid.gov/category/technology/transmission_angle_and_frequency_monitoring [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like. egory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Angle_and_Frequency_Monitoring&oldid=502506

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

2006 National Electric Transmission Congestion Study and Related Materials  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study and Related 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric Transmission Corridors were designated in 2007. They were invalidated by a federal appeals court in 2011. Comments and form letters were submitted by the public in response to this study. National Electric Transmission Congestion Study 2006 Executive Summary Full Text of the National Electric Transmission Congestion Study 2006

462

Updating the Electric Grid: An Introduction to Non-Transmission  

Broader source: Energy.gov (indexed) [DOE]

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

463

Updating the Electric Grid: An Introduction to Non-Transmission  

Broader source: Energy.gov (indexed) [DOE]

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

464

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

465

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

466

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

of incremental wind development. At the extreme, still otherextreme assumption, the implied unit cost of transmission for windon wind power in their analysis. On one extreme, a number of

Mills, Andrew D.

2009-01-01T23:59:59.000Z

467

Colorado/Transmission/Regulatory Overview | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Regulatory Overview < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Overview Roadmap State Data Regulatory Overview General Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution.

468

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Broader source: Energy.gov (indexed) [DOE]

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

469

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Broader source: Energy.gov (indexed) [DOE]

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

470

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Broader source: Energy.gov (indexed) [DOE]

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations. The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). DOE Affirms National Interest Electric Transmission Corridor Designations More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest

471

NREL: Transmission Grid Integration - Data and Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Data and Resources Data and Resources NREL offers the following transmission integration-related data and resources. Eastern Wind Dataset A key task of the Eastern Wind Integration and Transmission Study was to develop a dataset of three years of modeled time series wind speed and power. This dataset was designed to help energy professionals perform wind integration studies, compare potential wind sites spatially and temporally, and estimate power production from hypothetical wind plants. Western Wind Dataset A primary task of the Western Wind and Solar Integration Study was to produce a comprehensive dataset that could be used to model the build-out of potential wind plants in the Western United States. This dataset was designed to help energy professionals perform wind integration studies,

472

127 Natural Gas Transmission and Distribution Module  

E-Print Network [OSTI]

and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of the supply options available to bring gas to market centers within each of the NGTDM regions (Figure 9). The major assumptions used within the NGTDM are grouped into four general categories. They relate to (1) structural components of the model, (2) capacity expansion and pricing of transmission and distribution services, (3) Arctic pipelines, and (4) imports and exports. A complete listing of NGTDM assumptions and in-depth

Key Assumptions

473

Reinforcing Power Grid Transmission with FACTS Devices  

E-Print Network [OSTI]

We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed into the grid to relieve congestion created by load growth or fluctuations of intermittent renewable generation. We limit our selection of FACTS devices to those that can be represented by modification of the inductance of the transmission lines. Our master optimization problem minimizes the $l_1$ norm of the FACTS-associated inductance correction subject to constraints enforcing that no line of the system exceeds its thermal limit. We develop off-line heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) where at each step the constraints are linearized analytically around the current operating point. The algorithm is accelerated further with a version of the cutting plane method greatly reducing the number of active constraints during the optimization, while checking feasibility of the non-active constraints post...

Frolov, Vladimir; Chertkov, Misha

2013-01-01T23:59:59.000Z

474

Dispersion-free radial transmission lines  

DOE Patents [OSTI]

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

475

Image processing application maps optimal transmission routes  

SciTech Connect (OSTI)

The process of selecting an optimal route for a transmission line is complex as it involves technical, social, economic, environmental, and planning aspects. A new method was developed to help engineers select routes of specific transmission lines. The methodology is based on the use of satellite images of the geographic region in which the line will cross. The selection process searches for the most economical alternative and the one with the least environmental impact within the area of concern. This is achieved by using an image recognition software package and a program that uses minimal path techniques with support of weight restrictions. This article defines the methodology and uses a region of Mexico as an example to illustrate the optimal route-selection process.

Vega, M.; Sarmiento, H.G.

1996-04-01T23:59:59.000Z

476

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

477

Extraordinary optical transmission through patterned subwavelength apertures.  

SciTech Connect (OSTI)

Light propagating through a subwavelength aperture can be dramatically increased by etching a grating in the metal around the hole. Moreover, light that would typically broadly diverge when passing through an unpatterned subwavelength hole can be directed into a narrow beam by utilizing a specific pattern around the aperture. While the increased transmission and narrowed angular emission appear to defy far-field diffraction theory, they are consistent with a fortuitous plasmon/photon coupling. In addition, the coupling between photons and surface plasmons affects the emissivity of a surface comprised of such structures. These properties are useful across several strategic areas of interest to Sandia. A controllable emission spectrum could benefit satellite and military application areas. Photolithography and near-field microscopy are natural applications for a system that controls light beyond the diffraction limit in a manner that is easily parallelizable. Over the one year of this LDRD, we have built or modified the numerical tools necessary to model such structures. These numerical codes and the knowledge base for using them appropriately will be available in the future for modeling work on surface plasmons or other optical modeling at Sandia. Using these tools, we have designed and optimized structures for various transmission or emission properties. We demonstrate the ability to design a metallic skin with an emissivity peak at a pre-determined wavelength in the spectrum. We optimize structures for maximum light transmission and show transmitted beams that beat the far-field diffraction limit.

Kemme, Shanalyn A.; El-Kady, Ihab Fathy; Hadley, G. Ronald; Peters, David William; Lanes, Chris E.

2004-12-01T23:59:59.000Z

478

10 Year Transmission Plan for the Western Electricity Interconnection  

Broader source: Energy.gov (indexed) [DOE]

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

479

2009 National Electric Transmission Congestion Study - Las Vegas Workshop |  

Broader source: Energy.gov (indexed) [DOE]

2009 National Electric Transmission Congestion Study - Las Vegas 2009 National Electric Transmission Congestion Study - Las Vegas Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop On August 6, 2008, DOE hosted a regional pre-study workshop in Las Vegas, NV to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript available below. 8-06-08 Congestion Workshop Agenda - Las Vegas, NV.pdf Transcript - 2009 National Electric Transmission Congestion Study Las Vegas Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop

480

Electron microscopy and microanalysis Two transmission electron microscopes  

E-Print Network [OSTI]

Electron microscopy and microanalysis Two transmission electron microscopes (TEM) and three scanning electron micro- scopes (SEM) are operated by the De- partment. Attachments for TEM include energy dispersive X-ray spectrometer (EDS), scanning transmission attachment, serial electron energy loss

Note: This page contains sample records for the topic "monumental 500-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

File:08COCStateTransmissionProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

COCStateTransmissionProcess.pdf Jump to: navigation, search File File history File usage Metadata File:08COCStateTransmissionProcess.pdf Size of this preview: 463 599 pixels....

482

Integrating Renewable Energy into the Transmission and Distribution...  

Office of Environmental Management (EM)

Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands Integrating Renewable Energy into the Transmission and Distribution System of the U.S....

483

20% Wind Energy by 2030 - Chapter 4: Transmission and Integration...  

Broader source: Energy.gov (indexed) [DOE]

4: Transmission and Integration into the U.S. Electric System Summary Slides 20% Wind Energy by 2030 - Chapter 4: Transmission and Integration into the U.S. Electric System Summary...

484

RAPID/Geothermal/Transmission Siting & Interconnection/California...  

Open Energy Info (EERE)

Agency: California Energy Commission Transmission Siting In California, transmission lines set to operate with a voltage between 50 kV and 200 kV must obtain a permit to...

485

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network [OSTI]

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

486

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

487

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho...  

Broader source: Energy.gov (indexed) [DOE]

7: Boardman-Hemingway Transmission Line, Oregon and Idaho EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho SUMMARY The Bureau of Land Management and the U.S. Forest...

488

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

25, 2010 25, 2010 CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination

489

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

01 - 6310 of 26,764 results. 01 - 6310 of 26,764 results. Download Semiannual Report to Congress April 1, 2008- September 30, 2008 Office of Inspector General Semiannual Report to Congress, DOE/IG-SAR-10-08 http://energy.gov/ig/downloads/semiannual-report-congress-april-1-2008-september-30-2008 Download Independent Activity Report, Los Alamos Site Office- April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment [HIAR-LANL-2011-11-18] http://energy.gov/hss/downloads/independent-activity-report-los-alamos-site-office-april-2012 Page EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV

490

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91 - 9200 of 29,416 results. 91 - 9200 of 29,416 results. Download CX-005263: Categorical Exclusion Determination Wolf Fork Conservation Easement CX(s) Applied: B1.25 Date: 02/16/2011 Location(s): Columbia County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005263-categorical-exclusion-determination Download CX-001185: Categorical Exclusion Determination Replace Spacer Dampers Along the Wautoma-Rock Creek Number 1 500 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/03/2010 Location(s): Benton County, Yakima County, Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-001185-categorical-exclusion-determination Download CX-005009: Categorical Exclusion Determination Modify Two Structures Along the Vera Tap to Trentwood-Valley Way #1, 115

491

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 15, 2010 March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-006365: Categorical Exclusion Determination Washington-City-Spokane CX(s) Applied: A9, A11, B2.5, B5.1 Date: 03/12/2010 Location(s): Spokane, Washington Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-006364: Categorical Exclusion Determination Washington-City-Pasco CX(s) Applied: A9, A11, B5.1 Date: 03/12/2010 Location(s): Pasco, Washington Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-001182: Categorical Exclusion Determination

492

Microsoft Word - PearlSubExpansion_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Johny Luiz - TEP-CSB-2 Proposed Action: Pearl Substation 500-kilovolt (kV) #6 Bay Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes modification of existing substation equipment, the addition of a new 500-kV Bay 6, and a one-half acre yard expansion in the southwest corner of the substation. The yard expansion area is within BPA property, consists of mowed grass, and is to facilitate a 40 square foot addition to the Pearl Control House

493

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 7, 2010 CX-003767: Categorical Exclusion Determination Kansas-County-Leavenworth CX(s) Applied: A9, B2.5, B5.1 Date: 09/07/2010 Location(s): Leavenworth, Kansas Office(s): Energy Efficiency and Renewable Energy September 7, 2010 CX-003760: Categorical Exclusion Determination Arizona-City-Yuma CX(s) Applied: B2.5, B5.1 Date: 09/07/2010 Location(s): Yuma, Arizona Office(s): Energy Efficiency and Renewable Energy September 7, 2010 CX-003690: Categorical Exclusion Determination Solar Upgrade CX(s) Applied: A9, B5.1 Date: 09/07/2010 Location(s): California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 7, 2010 CX-003787: Categorical Exclusion Determination John Day-Big Eddy Number 2 500-Kilovolt Transmission Line Reconductor CX(s) Applied: B4.6

494

CX-002765: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-002765: Categorical Exclusion Determination Culvert Cleanout - Olinda Tracy 167-3 CX(s) Applied: B1.13, B1.3 Date: 06/01/2010 Location(s): Solano County, California Office(s): Western Area Power Administration-Sierra Nevada Region Western Area Power Administration proposes to conduct maintenance work on existing culverts and ditches associated with structure 167-3 on the Olinda-Tracy 500 kilovolt transmission line. The culverts and ditches have accumulated from 4 to 12 inches of sediment and may eventually impede drainage if not cleared. The work would consist of clearing sediment and debris from all culverts, culvert inlets and outlets, and drainage ditches to restore original function. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

495

Microsoft Word - CaptainJack_Olinda_CX_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cynthia Rounds Project Manager- TPC Proposed Action: Captain Jack-Olinda RAS LLL/LT Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.31 Installation or relocation of machinery and equipment Location: Olinda Substation, Shasta County, CA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to fund upgrades to BPA equipment at the Transmission Agency of Northern California 500-kilovolt (kV) Olinda Substation (also known as Vic Fazio Substation), which is operated and maintained by Western Area Power Administration (Western). BPA would fund Western to relocate existing and install new

496

CX-004881: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4881: Categorical Exclusion Determination 4881: Categorical Exclusion Determination CX-004881: Categorical Exclusion Determination Culvert Cleanout - Olinda-Tracy 167-3 CX(s) Applied: B1.3, B1.13 Date: 06/01/2010 Location(s): Solano County, California Office(s): Western Area Power Administration-Sierra Nevada Region Western Area Power Administration proposes to conduct maintenance work on existing culverts and ditches associated with structure 167-3 on the Olinda-Tracy 500 kilovolt transmission line. The culverts and ditches has accumulated from 4 to 12 inches of sediment and may eventually impede drainage if not clear. The work would consist of clearing sediment and debris from all culverts, culvert inlets and outlets, and drainage ditches to restore original function. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

497

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 4, 2010 March 4, 2010 CX-001134: Categorical Exclusion Determination Repair Water Leak in L-Area Valve 075 CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 4, 2010 CX-001129: Categorical Exclusion Determination Cut and Cap Firewater Line Tap-Off Near 714-7N CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 3, 2010 CX-001185: Categorical Exclusion Determination Replace Spacer Dampers Along the Wautoma-Rock Creek Number 1 500 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/03/2010 Location(s): Benton County, Yakima County, Office(s): Bonneville Power Administration March 2, 2010

498

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and  

Broader source: Energy.gov (indexed) [DOE]

36: I-5 Corridor Reinforcement Project, Multnomah County, 36: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash., to a new 500-kV substation near Troutdale, Ore. After initially identifying a large number of route segments, BPA combined those segments into four action alternatives (each with options): West, Central, East, and Crossover. The action alternatives and the No Action Alternative are analyzed in the draft EIS. The alternatives vary in length and include both existing and new

499

CX-008879.pdf  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum James Semrau Project Manager - TEP-TPP-1 Proposed Action: Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project PP&A Project No.: 2275 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance, B1.24 Property Transfers Location: Monitor, Clackamas County, Oregon Township 6 South, Range 1 East, Section 5 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to repair a rip-rap stream bank protecting tower 21/1 on the BPA Pearl-Marion No. 1 500-kilovolt transmission line. Tower 21/1 is located on a corner of Butte Creek where annual scour adjacent to the tower poses an immediate

500

Categorical Exclusion Determinations: Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 9, 2010 March 9, 2010 CX-001183: Categorical Exclusion Determination Replace Rock Creek-John Day Number 1 Spacers CX(s) Applied: B1.3 Date: 03/09/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration March 3, 2010 CX-001185: Categorical Exclusion Determination Replace Spacer Dampers Along the Wautoma-Rock Creek Number 1 500 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/03/2010 Location(s): Benton County, Yakima County, Office(s): Bonneville Power Administration March 1, 2010 CX-001040: Categorical Exclusion Determination Puget Sound Clean Cities Coalition Petroleum Reduction Project - Conversion CX(s) Applied: B5.1 Date: 03/01/2010 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory