Power System Equipment Module Test Project  

SciTech Connect

The technology of electric power generation when applying the binary process to hydrothermal resources had not yet been demonstrated in the United States. Accordingly, on November 10, 1977, the Electric Power Research Institute and the Department of Energy, acting through the Lawrence Berkeley Laboratory, agreed to cofund the Power System Equipment Module Test Project. The Power System Equipment Module Test Project consisted of a field test program to accomplish the objectives listed below while heating hydrocarbon fluids to above their critical points, expanding these fluids, and subsequently, condensing them below their critical points: (1) Verify the performance of state-of-the-art heat exchangers in geothermal service; (2) Verify the heat exchangers' performance heating either selected pure light hydrocarbons or selected mixtures of light hydrocarbons in the vicinity of their respective critical pressures and temperatures; (3) Establish overall heat transfer coefficients that might be used for design of commercial-size geothermal power plants using the same geothermal brine and light hydrocarbon working fluids; (4) Perform and investigate the above under representative fluid operating conditions during which the production wells would be pumped. The project was accomplished by diverting approximately 200 gpm of the flow from one of Magma Power Company's geothermal wells in the East Mesa Geothermal Field. After the heat was removed from the geothermal brine flow, the cooled flow was returned to Magma Power Company and recombined with the main brine stream for disposal by reinjection. Approximately five thermal megawatts was transferred from geothermal brine to hydrocarbon working fluids in a closed system. This heat was removed from the working fluids in a condenser and subsequently rejected to the environment by a wet cooling tower. The thermodynamic performance of both the working fluids and the system components was measured during the test program to achieve the project's objectives.

Schilling, J.R.

1980-12-01T23:59:59.000Z

2

PROJECT REPORT HVAC EQUIPMENT DEMOGRAPHICS AND CAPACITY  

E-Print Network (OSTI)

PROJECT REPORT HVAC EQUIPMENT DEMOGRAPHICS AND CAPACITY ANALYSIS TOOLS APPLICABLE TO MULTI Commercial HVAC Design Process 12 5.0 Conclusion 18 6.0 References 19 TABLE OF CONTENTS SECTIONS #12;MULTI performance by collectively improving the enve- lope, lighting and HVAC systems. The primary goals of the UC

California at Davis, University of

3

Project and Equipment Financing (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project and Equipment Financing (Virginia) Project and Equipment Financing (Virginia) Project and Equipment Financing (Virginia) < Back Eligibility Local Government Savings Category Other Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Solar Heating & Cooling Heating Water Heating Wind Program Info State Virginia Program Type State Loan Program Rebate Amount Varies Provider Virginia Resources Authority The Virginia Resources Authority (VRA) was created in 1984 and provides financial assistance to local governments in Virginia for a variety of projects, including energy and energy conservation projects. In March 2011, H.B. 2389 added "renewable energy" to the list of eligible projects (though it may have already been technically eligible under the "energy" category).

4

Project Execution Plan Review Module (RM)  

Energy.gov (U.S. Department of Energy (DOE))

The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the PEP development and maintenance for projects of any...

5

Module Title: Project Module Code: OPTO6005  

E-Print Network (OSTI)

Ibsen, Dr Ping Hua, Prof James Wilkinson Contact (email ID) sm@orc.soton.ac.uk, mi@orc.soton.ac.uk, ph2@orc.soton.ac.uk, jsw@orc.soton.ac.uk Is the module subject to external accreditation? No If yes and optical labs of the ORC 3. Train in technical and hands-on research skills to gain technical insight

Anderson, Jim

6

Name of Module: Next Generation Network Project 2  

E-Print Network (OSTI)

) 30 Total 270 8. Module Examination and Grading Procedures The project will be examined at the beginning of the module. 11. Enrolment Procedures To participate to the lectures/seminars/projectsName of Module: Next Generation Network ­ Project 2 CP (ECTS): 9 Short Name: MINF-KS-AV/PJ2.W12

Wichmann, Felix

7

Name of Module: Next Generation Network Project 1  

E-Print Network (OSTI)

) 30 Total 270 8. Module Examination and Grading Procedures The project will be examined at the beginning of the module. 11. Enrolment Procedures To participate to the lectures/seminars/projectsName of Module: Next Generation Network ­ Project 1 CP (ECTS): 9 Short Name: MINF-KS-AV/PJ1.W12

Wichmann, Felix

8

Projective module description of embedded noncommutative spaces  

E-Print Network (OSTI)

An algebraic formulation is given for the embedded noncommutative spaces over the Moyal algebra developed in a geometric framework in \\cite{CTZZ}. We explicitly construct the projective modules corresponding to the tangent bundles of the embedded noncommutative spaces, and recover from this algebraic formulation the metric, Levi-Civita connection and related curvatures, which were introduced geometrically in \\cite{CTZZ}. Transformation rules for connections and curvatures under general coordinate changes are given. A bar involution on the Moyal algebra is discovered, and its consequences on the noncommutative differential geometry are described.

R. B. Zhang; Xiao Zhang

2008-10-14T23:59:59.000Z

9

Collecting Construction Equipment Activity Data from Caltrans Project Records  

E-Print Network (OSTI)

Specifications lay out the procedures and rules to beis a more complex procedure than resurfacing and involvesdo not involve the procedures and quantity of equipment used

Kable, Justin M

2008-01-01T23:59:59.000Z

10

US Recovery Act Smart Grid Projects - Equipment Manufacturing | Open Energy  

Open Energy Info (EERE)

Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" title=\"Georgia System Operations Corporation Inc. Smart Grid Project\">Georgia System Operations Corporation Inc. Smart Grid Project","title":"Georgia System Operations Corporation Inc. Smart Grid Project","link":null,"lat":33.8545479,"lon":-84.2171424,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Project\" title=\"Whirlpool Corporation Smart Grid Project\">Whirlpool Corporation Smart Grid

11

Project W320 52-inch diameter equipment container load test: Test report  

SciTech Connect

This test report summarizes testing activities and documents the results of the load tests performed on-site and off-site to structural qualify the 52-inch equipment containers designed and fabricated under Project W-320.

Bellomy, J.R.

1995-02-22T23:59:59.000Z

12

Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility: Building 382 Rev. 1, 02/11/00 Facility: Building 382 Rev. 1, 02/11/00 Training: (1) ESH114 Lockout/Tagout ASD125 APS LOTO ESH371 Electrical Safety - General ESH195 PPE ESH141 Hand and Power Tools (2) ESH707 Accelerator Worker ESH738 GERT (3) ESH196 Hazard Communication ESH376 or 456 Chemical Waste (4) ASDSF6 (5) ESH170 OSHA Lead Standard ESH196 Hazard Communication ESH195 PPE ESH141 Hand and Power Tools (6) ESH195 PPE ESH141 Hand and Power Tools (7) Informal OJT (8) Formal OJT Management Tools: (A) ANL-E ESH Manual SMART (B) APS-SAD APS-CO (C) Waste Handling Procedure Manual Equipment Hazards Engineered Controls Electrical Safety Training References Electrical Safety Procedures Mechanical Safety Training References Mechanical

13

Low Dose Ionizing Radiation Modulates Immune Function New Project Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Modulates Immune Function New Project Overview Modulates Immune Function New Project Overview Gregory Nelson Loma Linda University Abstract The immune system provides the first line of defense for exposures to environmental hazards. Protective immunity mechanisms using innate or adaptive responses are employed to mitigate acute challenges or amplify the readiness of the system to respond to future challenges. Some stimuli lead to amplified inflammatory reactions such as delayed hypersensitivity which is required for immunity to parasites and can also lead to adverse consequences such as contact dermatitis. Radiation exposure has the potential to aggravate hypersensitivity reactions as well as to suppress protective immunity. Ionizing radiation at high doses has long been recognized as highly effective in destroying cells of the immune system,

14

Usage of Electric Vehicle Supply Equipment Along the Corridors between the EV Project Major Cities  

SciTech Connect

The report explains how the EVSE are being used along the corridors between the EV Project cities. The EV Project consists of a nationwide collaboration between Idaho National Laboratory (INL), ECOtality North America, Nissan, General Motors, and more than 40 other city, regional and state governments, and electric utilities. The purpose of the EV Project is to demonstrate the deployment and use of approximately 14,000 Level II (208-240V) electric vehicle supply equipment (EVSE) and 300 fast chargers in 16 major cities. This research investigates the usage of all currently installed EV Project commercial EVSE along major interstate corridors. ESRI ArcMap software products are utilized to create geographic EVSE data layers for analysis and visualization of commercial EVSE usage. This research locates the crucial interstate corridors lacking sufficient commercial EVSE and targets locations for future commercial EVSE placement. The results and methods introduced in this research will be used by INL for the duration of the EV Project.

Mindy Kirkpatrick

2012-05-01T23:59:59.000Z

15

Failure Forewarning in NPP Equipment NERI2000-109 Final Project Report  

SciTech Connect

The objective of this project is forewarning of machine failures in critical equipment at next-generation nuclear power plants (NPP). Test data were provided by two collaborating institutions: Duke Engineering and Services (first project year), and the Pennsylvania State University (Applied Research Laboratory) during the second and third project years. New nonlinear methods were developed and applied successfully to extract forewarning trends from process-indicative, time-serial data for timely, condition-based maintenance. Anticipation of failures in critical equipment at next-generation NPP will improve the scheduling of maintenance activities to minimize safety concerns, unscheduled non-productive downtime, and collateral damage due to unexpected failures. This approach provides significant economic benefit, and is expected to improve public acceptance of nuclear power. The approach is a multi-tiered, model-independent, and data-driven analysis that uses ORNL's novel nonlinear method to extract forewarning of machine failures from appropriate data. The first tier of the analysis provides a robust choice for the process-indicative data. The second tier rejects data of inadequate quality. The third tier removes signal artifacts that would otherwise confound the analysis, while retaining the relevant nonlinear dynamics. The fourth tier converts the artifact-filtered time-serial data into a geometric representation, that is then transformed to a discrete distribution function (DF). This method allows for noisy, finite-length datasets. The fifth tier obtains dissimilarity measures (DM) between the nominal-state DF and subsequent test-state DFs. Forewarning of a machine failure is indicated by several successive occurrences of the DM above a threshold, or by a statistically significant trend in the DM. This paradigm yields robust nonlinear signatures of degradation and its progression, allowing earlier and more accurate detection of the machine failure.

Hively, LM

2004-03-26T23:59:59.000Z

16

DOE special projects: PLACE3S GIS MODULE [Final report  

SciTech Connect

PLACE3S (PLAnning for Community Energy, Economic and Environmental Sustainability) energy option matching module.

NONE

2002-07-31T23:59:59.000Z

17

Project Profile: Sensible Heat, Direct, Dual-Media Thermal Energy Storage Module  

Energy.gov (U.S. Department of Energy (DOE))

Acciona Solar, under the Thermal Storage FOA, plans to develop a prototype thermal energy storage (TES) module with high efficiency. This project is looking at a packed or structured bed TES tank with molten salt flowing through it.

18

Residential Demand Module  

Gasoline and Diesel Fuel Update (EIA)

2 2 Residential Demand Module The NEMS Residential Demand Module projects future residential sector energy requirements based on projections of the number of households and the stock, efficiency, and intensity of energy-consuming equipment. The Residential Demand Module projections begin with a base year estimate of the housing stock, the types and numbers of energy-consuming appliances servicing the stock, and the "unit energy consumption" (UEC) by appliance (in million Btu per household per year). The projection process adds new housing units to the stock, determines the equipment installed in new units, retires existing housing units, and retires and replaces appliances. The primary exogenous drivers for the module are housing starts by type

19

Safety equipment list for 241-C-106 waste retrieval, Project W-320: Revision 1  

SciTech Connect

The goals of the C-106 sluicing operation are: (1) to stabilize the tank by reducing the heat load in the tank to less than 42 MJ/hr (40,000 Btu/hour), and (2) to initiate demonstration of single-shell tank (SST) retrieval technology. The purpose of this supporting document (SD) is as follows: (1) to provide safety classifications for items (systems, structures, equipment, components, or parts) for the waste retrieval sluicing system (WRSS), and (2) to document and methodology used to develop safety classifications. Appropriate references are made with regard to use of existing systems, structures, equipments, components, and parts for C-106 single-shell transfer tank located in the C Tank Farm, and 241-AY-102 (AY-102) double shell receiver tanks (DST) located in the Aging Waste Facility (AWF). The Waste Retrieval Sluicing System consists of two transfer lines that would connect the two tanks, one to carry the sluiced waste slurry to AY-102, and the other to return the supernatant liquid to C-106. The supernatant, or alternate fluid, will be used to mobilize waste in C-106 for the sluicing process. The equipment necessary for the WRSS include pumps in each tank, sluicers to direct the supernatant stream in C-106, a slurry distributor in AY-102, HVAC for C-106, instrumentation and control devices, and other existing components as required.

Conner, J.C.

1994-11-15T23:59:59.000Z

20

A comprehensive approach to selecting the water chemistry of the secondary coolant circuit in the projects of nuclear power stations equipped with VVER-1200 reactors  

Science Journals Connector (OSTI)

The paper presents the results obtained from studies on selecting the water chemistry of the secondary coolant circuit carried out for the project of a nuclear power station equipped with a new-generation VVER-12...

V. F. Tyapkov

2011-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Spent nuclear fuel project cold vacuum drying facility safety equipment list  

SciTech Connect

This document provides the safety equipment list (SEL) for the Cold Vacuum Drying Facility (CVDF). The SEL was prepared in accordance with the procedure for safety structures, systems, and components (SSCs) in HNF-PRO-516, ''Safety Structures, Systems, and Components,'' Revision 0 and HNF-PRO-097, Engineering Design and Evaluation, Revision 0. The SEL was developed in conjunction with HNF-SO-SNF-SAR-O02, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998). The SEL identifies the SSCs and their safety functions, the design basis accidents for which they are required to perform, the design criteria, codes and standards, and quality assurance requirements that are required for establishing the safety design basis of the SSCs. This SEL has been developed for the CVDF Phase 2 Safety Analysis Report (SAR) and shall be updated, expanded, and revised in accordance with future phases of the CVDF SAR until the CVDF final SAR is approved.

IRWIN, J.J.

1999-02-24T23:59:59.000Z

22

Assumptions to the Annual Energy Outlook - Residential Demand Module  

Gasoline and Diesel Fuel Update (EIA)

Residential Demand Module Residential Demand Module Assumption to the Annual Energy Outlook Residential Demand Module The NEMS Residential Demand Module forecasts future residential sector energy requirements based on projections of the number of households and the stock, efficiency, and intensity of use of energy-consuming equipment. The Residential Demand Module projections begin with a base year estimates of the housing stock, the types and numbers of energy-consuming appliances servicing the stock, and the “unit energy consumption” by appliance (or UEC—in million Btu per household per year). The projection process adds new housing units to the stock, determines the equipment installed in new units, retires existing housing units, and retires and replaces appliances. The primary exogenous drivers for the module are housing starts by type (single-family, multifamily and mobile homes) and Census Division and prices for each energy source for each of the nine Census Divisions (see Figure 5). The Residential Demand Module also requires projections of available equipment and their installed costs over the forecast horizon. Over time, equipment efficiency tends to increase because of general technological advances and also because of Federal and/or state efficiency standards. As energy prices and available equipment changes over the forecast horizon, the module includes projected changes to the type and efficiency of equipment purchased as well as projected changes in the usage intensity of the equipment stock.

23

Controlling Beryllium Contaminated Material And Equipment For The Building 9201-5 Legacy Material Disposition Project  

SciTech Connect

This position paper addresses the management of beryllium contamination on legacy waste. The goal of the beryllium management program is to protect human health and the environment by preventing the release of beryllium through controlling surface contamination. Studies have shown by controlling beryllium surface contamination, potential airborne contamination is reduced or eliminated. Although there are areas in Building 9201-5 that are contaminated with radioactive materials and mercury, only beryllium contamination is addressed in this management plan. The overall goal of this initiative is the compliant packaging and disposal of beryllium waste from the 9201-5 Legacy Material Removal (LMR) Project to ensure that beryllium surface contamination and any potential airborne release of beryllium is controlled to levels as low as practicable in accordance with 10 CFR 850.25.

Reynolds, T. D.; Easterling, S. D.

2010-10-01T23:59:59.000Z

24

Bulk Hauling Equipment for CHG  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

load of CHG Semitrailer Mass Trailer or ModuleChassis Module Mass Hydrogen Gas Mass CAPITAL EXPENDITURE FOR BULK HAULING EQUIPMENT For large consumption, total CapEx for...

25

Assumptions to the Annual Energy Outlook 1999 - Residential Demand Module  

Gasoline and Diesel Fuel Update (EIA)

residential.gif (5487 bytes) residential.gif (5487 bytes) The NEMS Residential Demand Module forecasts future residential sector energy requirements based on projections of the number of households and the stock, efficiency, and intensity of use of energy-consuming equipment. The Residential Demand Module projections begin with a base year estimates of the housing stock, the types and numbers of energy-consuming appliances servicing the stock, and the “unit energy consumption” by appliance (or UEC—in million Btu per household per year). The projection process adds new housing units to the stock, determines the equipment installed in new units, retires existing housing units, and retires and replaces appliances. The primary exogenous drivers for the module are housing starts by type (single-family, multifamily and mobile homes) and Census Division and prices for each energy source for each of the nine Census Divisions. The Residential Demand Module also requires projections of available equipment over the forecast horizon. Over time, equipment efficiency tends to increase because of general technological advances and also because of Federal and/or state efficiency standards. As energy prices and available equipment changes over the forecast horizon, the module includes projected changes to the type and efficiency of equipment purchased as well as projected changes in the usage intensity of the equipment stock.

26

Assumptions to the Annual Energy Outlook 2000 - Residential Demand Module  

Gasoline and Diesel Fuel Update (EIA)

Residential Demand Module forecasts future residential sector energy requirements based on projections of the number of households and the stock, efficiency, and intensity of use of energy-consuming equipment. The Residential Demand Module projections begin with a base year estimates of the housing stock, the types and numbers of energy-consuming appliances servicing the stock, and the “unit energy consumption” by appliance (or UEC—in million Btu per household per year). The projection process adds new housing units to the stock, determines the equipment installed in new units, retires existing housing units, and retires and replaces appliances. The primary exogenous drivers for the module are housing starts by type (single-family, multifamily and mobile homes) and Census Division and prices for each energy source for each of the nine Census Divisions. The Residential Demand Module also requires projections of available equipment over the forecast horizon. Over time, equipment efficiency tends to increase because of general technological advances and also because of Federal and/or state efficiency standards. As energy prices and available equipment changes over the forecast horizon, the module includes projected changes to the type and efficiency of equipment purchased as well as projected changes in the usage intensity of the equipment stock.

27

Approved Module Information for EE2EDP, 2014/5 Module Title/Name: Electronics Design Project Module Code: EE2EDP  

E-Print Network (OSTI)

Code: EE2EDP School: Engineering and Applied Science Module Type: Standard Module New Module? No Module Engineering Systems. BEng Electrical and Electronic Engineering. BEng Electronic Engineering and Computer competition among the groups to produce a 'best' system. * Students will be required to use creativity

Neirotti, Juan Pablo

28

CERN News: Selection of the type of superconducting coil for the Omega project; New intensity records at the proton synchrotron; Progress with the Spiral Reader film measuring equipment; New technique at transition energy on the proton synchrotron; CERN Courier 10th anniversary; Equipment travelling from and to Serpukhov  

E-Print Network (OSTI)

CERN News: Selection of the type of superconducting coil for the Omega project; New intensity records at the proton synchrotron; Progress with the Spiral Reader film measuring equipment; New technique at transition energy on the proton synchrotron; CERN Courier 10th anniversary; Equipment travelling from and to Serpukhov

1969-01-01T23:59:59.000Z

29

Assumptions to the Annual Energy Outlook 2002 - Residential Demand Module  

Gasoline and Diesel Fuel Update (EIA)

Residential Demand Module Residential Demand Module The NEMS Residential Demand Module forecasts future residential sector energy requirements based on projections of the number of households and the stock, efficiency, and intensity of use of energy-consuming equipment. The Residential Demand Module projections begin with a base year estimates of the housing stock, the types and numbers of energy-consuming appliances servicing the stock, and the “unit energy consumption” by appliance (or UEC—in million Btu per household per year). The projection process adds new housing units to the stock, determines the equipment installed in new units, retires existing housing units, and retires and replaces appliances. The primary exogenous drivers for the module are housing starts by type (single-family, multifamily and mobile homes) and

30

Assumptions to the Annual Energy Outlook 2001 - Residential Demand Module  

Gasoline and Diesel Fuel Update (EIA)

Residential Demand Module Residential Demand Module The NEMS Residential Demand Module forecasts future residential sector energy requirements based on projections of the number of households and the stock, efficiency, and intensity of use of energy-consuming equipment. The Residential Demand Module projections begin with a base year estimates of the housing stock, the types and numbers of energy-consuming appliances servicing the stock, and the “unit energy consumption” by appliance (or UEC—in million Btu per household per year). The projection process adds new housing units to the stock, determines the equipment installed in new units, retires existing housing units, and retires and replaces appliances. The primary exogenous drivers for the module are housing starts by type (single-family, multifamily and mobile homes) and

31

Cleanroom Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Conventional Machining Engis Lapping and Polishing Machine MET One particle Counter Sand Blaster Cabinet Flycutting Machine Lithography Equipment Mann 600 Pattern Generator Oriel...

32

Commercial equipment cost database  

SciTech Connect

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

33

Microsoft Word - APRIL 2009 PMCDP Module CHRIS ESS Tutorial_MAINTAIN_PROJECT_HISTORY.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTIN PROJECT HISTORY MAINTIN PROJECT HISTORY REV: APRIL 2009 1 1. To update your project history, click on the "PMCDP Menu" and choose "Maintain project history." Maintain Project History ESS Tutorial, Project Management Career Development Program MAINTIN PROJECT HISTORY REV: APRIL 2009 2 2. A screen with the header "PMCDP Profile for [Your Name]" will appear titled "Step 3: Maintain project history." Options: Delete: This will delete all information for the selected project as currently showing in the table. Update: This will bring you back to the original input screen for project information. View Description: This will bring up a text box that will allow you to see the description previously entered. Sort: Project history information is presented in date-order, with the most recent position

34

Novel Energy Conversion Equipment for Low Temperature Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Project objective: Develop...

35

LAB EQUIPMENT SERVICE POLICY This policy has not yet been vetted or formatted as part of the policy review project, however, all  

E-Print Network (OSTI)

but not limited to fume hoods, autoclaves, centrifuges, refrigerators, freezers, incubators, etc. Materials, or stored. This may include but is not limited to fume hoods, autoclaves, centrifuges, refrigerators, freezers, and incubators (hereafter "equipment'). This procedure applies to equipment located within both

Krovi, Venkat

36

EIA-Assumptions to the Annual Energy Outlook - Residential Demand Module  

Gasoline and Diesel Fuel Update (EIA)

Residential Demand Module Residential Demand Module Assumptions to the Annual Energy Outlook 2007 Residential Demand Module Figure 5. United States Census Divisions. Need help, contact the National Energy Information Center at 202-586-8800. The NEMS Residential Demand Module forecasts future residential sector energy requirements based on projections of the number of households and the stock, efficiency, and intensity of use of energy-consuming equipment. The Residential Demand Module projections begin with a base year estimate of the housing stock, the types and numbers of energy-consuming appliances servicing the stock, and the "unit energy consumption" by appliance (or UEC-in million Btu per household per year). The projection process adds new housing units to the stock, determines the equipment installed in new

37

Microsoft PowerPoint - Project DE_FE0000032 Student Modules.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

and and Research and Research 2011 Yearly Review Meeting P j t DE FE0002111 Project DE-FE0002111 Title: A Modular Curriculum for Training University Students in Industry Standard CO2 Sequestration and Enhanced Oil Recovery q y Methodologies University of Texas of the Permian Basin y Presenter: Dr. Robert Trentham, Director Center for Energy and Economic Diversification February 23, 2011 Project Participants Project Participants * Dr Robert C. Trentham, Co-PI (Geology, CO2) , ( gy, ) * Dr Emily Stoudt, Co-PI (Geology) * Mr Robert Kiker (Production Engineering, Plant ) Visits) * Mr Steve Melzer (Reservoir Engineering, CO2) M T i M G i (L d M t) * Ms Teri McGuigan (Land Management) * Mr EMr. Emmanuel Ede, student * Ms Ibukun Bode (IBK)

38

Healthcare Energy: Spotlight on Medical Equipment  

Energy.gov (U.S. Department of Energy (DOE))

The Building Technologies Office conducted a healthcare energy end-use monitoring project for two sites. Read details about large medical imaging equipment energy results.

39

Chapter 4, Small Commercial and Residential Unitary and Split System HVAC Cooling Equipment-Efficiency Upgrade Evaluation Protocol: The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Small Commercial 4: Small Commercial and Residential Unitary and Split System HVAC Cooling Equipment-Efficiency Upgrade Evaluation Protocol David Jacobson, Jacobson Energy Research Subcontract Report NREL/SR-7A30-53827 April 2013 The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures 4 - 1 Chapter 4 - Table of Contents 1 Measure Description .............................................................................................................. 2 2 Application Conditions of Protocol ....................................................................................... 3 2.1 Programs with Enhanced Measures ................................................................................. 5 3 Savings Calculations .............................................................................................................. 6

40

Laboratory Equipment Donation Program - Equipment Applications  

Office of Scientific and Technical Information (OSTI)

Specific questions concerning equipment should be directed to the point of Specific questions concerning equipment should be directed to the point of contact responsible for the item(s) under consideration. This information is listed on the "Equipment Information" page, as well as on the grant award e-mail sent to the applicant. Step 1: Search and Apply for Equipment Note: If you know the Item Control Number of the equipment you need, you may go directly to the on-line application. Please follow these procedures to "Search Equipment" and apply for equipment using the LEDP Online Application: Select the "Search Equipment" menu link. Enter the type of equipment desired into the search box or choose the "Equipment List" link, which will allow you see a complete list of available equipment. Select the "Item Control Number" for the desired equipment. This

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Better Buildings Alliance Equipment Performance Specifications  

NLE Websites -- All DOE Office Websites (Extended Search)

BBA Equipment Performance BBA Equipment Performance Specifications William Goetzler Navigant Consulting william.goetzler@navigant.com (781) 270 8351 April 4, 2013 Better Buildings Alliance BTO Program Review 2 | Building Technologies Office eere.energy.gov Project Overview The BBA Performance Specifications project provides information and tools to help BBA members and other commercial building owners/operators specify and purchase high efficiency equipment. - Ensures targeted technologies are of interest to end users and manufacturers

42

Better Buildings Alliance Equipment Performance Specifications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BBA Equipment Performance BBA Equipment Performance Specifications William Goetzler Navigant Consulting william.goetzler@navigant.com (781) 270 8351 April 4, 2013 Better Buildings Alliance BTO Program Review 2 | Building Technologies Office eere.energy.gov Project Overview The BBA Performance Specifications project provides information and tools to help BBA members and other commercial building owners/operators specify and purchase high efficiency equipment. - Ensures targeted technologies are of interest to end users and manufacturers

43

Project Fact Sheet Project Update  

E-Print Network (OSTI)

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

44

TOB Module Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

SiTracker Home Page Participating Institutions and Principal Contacts Useful Links Notes Images TOB Module Assembly and Testing Project TOB Integration Data Tracker Offline DQM LHC Fluence Calculator Total US Modules Tested Graph Total US Modules Tested Graph Total US Modules Tested Total US Modules Tested US Modules Tested Graph US Modules Tested Graph US Modules Tested US Modules Tested Rod Assembly TOB Modules on a Rod TOB Rod Insertion Installation of a TOB Rod Completed TOB Completed Tracker Outer Barrel TOB Module Assembly and Testing Project All 5208 modules of the CMS Tracker Outer Barrel were assembled and tested at two production sites in the US: the Fermi National Accelerator Laboratory and the University of California at Santa Barbara. The modules were delivered to CERN in the form of rods, with the last shipment taking

45

The Value of Computational Thinking across Grade Levels 9-12 Project VCTAL is developing a set of instructional modules and mini-modules for use in high  

E-Print Network (OSTI)

create Sample Module Questions · Is an electric car an economical choice? · Where should you install new whether it's time to buy an electric car by examining its cost to own and convenience to operate

46

The Value of Computational Thinking across Grade Levels 9-12 Project VCTAL is developing a set of instructional modules and mini-modules for use in high  

E-Print Network (OSTI)

create Sample Module Questions · Is an electric car an economical choice? · Where should you install new explores whether it's time to buy an electric car by examining its cost to own and convenience to operate the cost of owning an electric car relative to a traditional hybrid or a gasoline-powered car. Students

47

User Electrical Equipment Inspections  

NLE Websites -- All DOE Office Websites (Extended Search)

User Electronic and Electrical Equipment Inspection Criteria In order to be in compliance with NEC, OSHA, and DOE regulations all electronic and electrical equipment at the APS...

48

University of Delaware | CCEI Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

CCEI Equipment Click column headings to sort Type Equipment Details Institution Type Equipment Details Institution: Lab Lab BACK TO TOP...

49

DATA SHARING REPORT CHARACTERIZATION OF POPULATION 7: PERSONAL PROTECTIVE EQUIPMENT, DRY ACTIVE WASTE, AND MISCELLANEOUS DEBRIS, SURVEILLANCE AND MAINTENANCE PROJECT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE  

SciTech Connect

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

Harpenau, Evan M

2013-10-10T23:59:59.000Z

50

Bulk Hauling Equipment for CHG  

NLE Websites -- All DOE Office Websites (Extended Search)

BULK HAULING EQUIPMENT FOR CHG BULK HAULING EQUIPMENT FOR CHG Don Baldwin Director of Product Development - Hexagon Lincoln HEXAGON LINCOLN TITAN(tm) Module System Compressed Hydrogen Gas * Capacity 250 bar - 616 kg 350 bar - 809 kg 540 bar - 1155 kg * Gross Vehicle Weight (with prime mover) 250 bar - 28 450 kg 350 bar - 30 820 kg 540 bar - 39 440 kg * Purchase Cost 250 bar - $510,000 350 bar - $633,750 540 bar - $1,100,000 Compressed Natural Gas * Capacity (250 bar at 15 C) - 7412 kg * GVW (With prime mover) - 35 250 kg * Purchase Cost (+/- 5%) - $510,000 HEXAGON LINCOLN TITAN(tm) V Magnum Trailer System Compressed Hydrogen Gas * Capacity 250 bar - 800 kg 350 bar - 1050 kg 540 bar - 1500 kg * Gross Vehicle Weight (with prime mover) 250 bar - 31 000 kg 350 bar - 34 200 kg 540 bar - 45 700 kg * Purchase Cost (+/-

51

Agricultural Equipment | Open Energy Information  

Open Energy Info (EERE)

Equipment Incentives Retrieved from "http:en.openei.orgwindex.php?titleAgriculturalEquipment&oldid267143...

52

Energy Audit Equipment  

E-Print Network (OSTI)

The tools (equipment) needed to perform an energy audit include those items which assist the auditor in measuring the energy used by equipment or lost in inefficiency. Each tool is designed for a specific measurement. They can be inexpensive simple...

Phillips, J.

2012-01-01T23:59:59.000Z

53

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

54

After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-Load Equipment  

E-Print Network (OSTI)

LBNL-53729 After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-Load To download this paper and related data go to: http://enduse.lbl.gov/Projects/OffEqpt.html The work described.................................................................................................................................................5 Office Equipment Data Collection

55

Laboratory Equipment Donation Program - Equipment List  

Office of Scientific and Technical Information (OSTI)

Equipment List Equipment List Already know the item control number? Submit Reset Item Control Number Equipment Name Date Entered Condition Picture 89022833290004 1300594 TLD DETECTOR 12/16/2013 Repairable N/A 89022833290005 1300595 PICOMETER 12/16/2013 Repairable N/A 89022833290008 1300598 READER 12/16/2013 Repairable N/A 89022833290010 1300600 DETECTOR VACUUM PUMP 12/16/2013 Repairable N/A 89022833290016 1300606 TLD READER 12/16/2013 Repairable N/A 89022833290018 1300608 READER 12/16/2013 Repairable N/A 89022833290019 1300609 ANALYZER WITH DETECTOR 12/16/2013 Repairable N/A 89022833180013 1300993 PRESSURE REGULATOR 12/04/2013 Repairable N/A 89022833180022 1301098 VACUUM GAUGE 12/04/2013 Repairable N/A 89022833180023 1301099 OSCILLOSCOPE 12/04/2013 Repairable N/A

56

Project Sponsor: An Original Equipment Manufacturer (confidential)  

E-Print Network (OSTI)

. The main consumers are the air separation, the CO2 purification and the CO2 compression units. Flue gas high concentration of CO2 in the gas flowing through the boiler, the difference in physical properties of processes involves contacting the flue gas with an aqueous amine solution to absorb the CO2 and thermally

Mease, Kenneth D.

57

Electric Vehicle Supply Equipment  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Procurement of Electric Vehicle Supply Equipment This Guidance provides a description of the types of requirements to be included in an employer's workplace charging request for...

58

Renewable Energy Equipment Exemption  

Energy.gov (U.S. Department of Energy (DOE))

Iowa allow a sales tax exemption for solar, wind, and hydroelectricity equipment. As of May 2013, the Iowa sales tax rate is 6%.

59

Maersk Line Equipment guide  

National Nuclear Security Administration (NNSA)

a total capacity of 85 cubic metres We offer various types of extra equipment: * Hanger beams which allow transport of garments on hangers without further packing * Lashing bars...

60

Insulation of Electrical Equipment  

Science Journals Connector (OSTI)

... A VACATION 'school' on the insulation of electrical equipment was held in the Electrical Engineering Department of the Imperial College of ... the universities. The purpose of the course was to consider the factors which are limiting insulation design in the main classes of electrical equipment, and the general principles which should ...

1952-12-13T23:59:59.000Z

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Novel Energy Conversion Equipment for Low Temperature Geothermal Resources  

Open Energy Info (EERE)

Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Project Type / Topic 1 Recovery Act: Geothermal Technologies Program Project Type / Topic 2 Geothermal Energy Production from Low Temperature Resources, Coproduced Fluids from Oil and Gas Wells, and Geopressured Resources Project Type / Topic 3 Low Temperature Resources Project Description Using mass-produced chiller equipment for "reverse refrigeration" to generate electricity: This approach allows Johnson Controls to take advantage of the economies of scale and manufacturing experience gained from current products while minimizing performance risks. Process efficiencies will be increased over the current state of the art in two ways: better working fluids and improved cycle heat management.

62

Commonwealth's Master Equipment Leasing Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commonwealth's Master Equipment Leasing Program Commonwealth&#039;s Master Equipment Leasing Program Commonwealth's Master Equipment Leasing Program < Back Eligibility Institutional State Government Program Info State Virginia Program Type Leasing Program Provider Virginia Department of the Treasury The [http://www.trs.virginia.gov/debt/MELP%20Guides.aspx Master Equipment Leasing Program] (MELP) ensures that all Commonwealth agencies, authorities and institutions obtain consistent and competitive credit terms for financing equipment and energy efficiency projects. Agencies can finance energy projects at a minimum of $10,000 and can make repayments over 3, 5, 7 and 10 year terms. '''Qualifying Energy Projects''' Energy efficiency projects may include personal property, the installation or modification of an installation in a building, professional management,

63

HVAC Equipment Rebate Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Equipment Rebate Program HVAC Equipment Rebate Program HVAC Equipment Rebate Program < Back Eligibility Agricultural Commercial Industrial Installer/Contractor Institutional Multi-Family Residential Nonprofit Schools Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Heat Pumps Maximum Rebate Rebates of greater than $5,000 require pre-approval Program Info Funding Source Efficiency Vermont Public Benefit Fund Expiration Date 06/30/2013 State Vermont Program Type State Rebate Program Rebate Amount Varies depending on technology and efficiency Provider Efficiency Vermont NOTE: Rebate reservations are required for all boiler and furnace projects. Efficiency Vermont offers rebates for commercial installations of high-efficiency HVAC equipment and controls. For businesses and purchases

64

Sonication standard laboratory module  

DOE Patents (OSTI)

A standard laboratory module for automatically producing a solution of cominants from a soil sample. A sonication tip agitates a solution containing the soil sample in a beaker while a stepper motor rotates the sample. An aspirator tube, connected to a vacuum, draws the upper layer of solution from the beaker through a filter and into another beaker. This beaker can thereafter be removed for analysis of the solution. The standard laboratory module encloses an embedded controller providing process control, status feedback information and maintenance procedures for the equipment and operations within the standard laboratory module.

Beugelsdijk, Tony (Los Alamos, NM); Hollen, Robert M. (Los Alamos, NM); Erkkila, Tracy H. (Los Alamos, NM); Bronisz, Lawrence E. (Los Alamos, NM); Roybal, Jeffrey E. (Santa Fe, NM); Clark, Michael Leon (Menan, ID)

1999-01-01T23:59:59.000Z

65

Equipment Insulation | Open Energy Information  

Open Energy Info (EERE)

List of Equipment Insulation Incentives Retrieved from "http:en.openei.orgwindex.php?titleEquipmentInsulation&oldid267163" Category: Articles with outstanding TODO tasks...

66

NSLS Electrical Equipment Inspection  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrical Equipment Inspection Information Electrical Equipment Inspection Information A note to vendors visiting NSLS A note to users visiting NSLS Proteus Electrical Conformity Remediation Currently Certified Electrical Equipment Inspectors: First Line Contacts Email Extension Poshka, Dennis poshka@bnl.gov 2825 Alternate Contacts Boerner Jr, Albert aboerner@bnl.gov 5990 Buda, Scott buda@bnl.gov 3914 Caruso, Michael caruso@bnl.gov 4100 Chmiel, Robert chmiel@bnl.gov 8141 Church, Randolph church@bnl.gov 2736 Clay, Barret clay@bnl.gov 7284 D'Alsace, Roy dalsace@bnl.gov 3973 Danneil, Christopher cdanneil@bnl.gov 8609 Davila, Peter davila@bnl.gov 7625 De Toll, Peter detoll@bnl.gov 4100 Durfee, Douglas ddurfee@bnl.gov 7625 Fulkerson, Michael fulkerso@bnl.gov 5194 Gallagher, John jgallagher@bnl.gov 5770 Harder, David dharder@bnl.gov 4978

67

Scientist Equipment and Outline  

NLE Websites -- All DOE Office Websites (Extended Search)

Outline and Equipment Outline and Equipment LIGHT AND COLOR Grade levels: can be adapted for grades 2-8. Length of time: 30-45 minues. Room preference: Double classroom or all-purpose room. Equipment is located in the Lederman Science Center. Talk to Susan Dahl to borrow this set. Spectrum tube power supply, gas tubes and diffraction grating glasses Light box with red, green, and blue translucent film Power chord, extension chord Large set of lenses Small concave and convex lenses Magnetic optics kit, includes a small laser Slinky Flashlight Clear plastic tub, powdered milk Water Radiometer Electromagnetic energy spectrum poster Set of red, green and blue flood lights Where does light come from? Use a boy and a girl to make a human demonstration of molecules and atoms. Have students rub their hands together and notice friction equals heat.

68

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

69

Financing Non-Residential Photovoltaic Projects: Options and Implications  

E-Print Network (OSTI)

of distributed solar energy projects. North American Cleanof energy projects, including equipment which uses solarSolar Renewable Energy Credit A REC from a solar project.

Bolinger, Mark

2009-01-01T23:59:59.000Z

70

CSIC Chongqing Haizhuang Windpower Equipment Co Ltd | Open Energy  

Open Energy Info (EERE)

CSIC Chongqing Haizhuang Windpower Equipment Co Ltd CSIC Chongqing Haizhuang Windpower Equipment Co Ltd Jump to: navigation, search Name CSIC (Chongqing) Haizhuang Windpower Equipment Co Ltd Place Chongqing Municipality, China Zip 400021 Sector Wind energy Product A wind turbine producer and wind power project developer. References CSIC (Chongqing) Haizhuang Windpower Equipment Co Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. CSIC (Chongqing) Haizhuang Windpower Equipment Co Ltd is a company located in Chongqing Municipality, China . References ↑ "CSIC (Chongqing) Haizhuang Windpower Equipment Co Ltd" Retrieved from "http://en.openei.org/w/index.php?title=CSIC_Chongqing_Haizhuang_Windpower_Equipment_Co_Ltd&oldid=343992

71

Emergency Facilities and Equipment  

Directives, Delegations, and Requirements

This volume clarifies requirements of DOE O 151.1 to ensure that emergency facilities and equipment are considered as part of emergency management program and that activities conducted at these emergency facilities are fully integrated. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

72

Equipment for ?-Radiography  

Science Journals Connector (OSTI)

... felt for a well-designed protective carrier and exposure unit for use with radium or radon. The announcement that Johnson Matthey and Co., Ltd., are manufacturing protective equipment ... will assist the industrial radiologist to take advantage of the improved supplies of radium and radon which are now available (Nature, June 4, 1949, p. 867). ...

1949-09-10T23:59:59.000Z

73

field_equipment.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

EQUIPMENT INVENTORY EQUIPMENT INVENTORY Trucks * Five vac/pressure trucks, 60-90 bbl, up to 5 bpm at 5,000 lb. * Water/fi re truck, 110 bbl * Two dump trucks: 5-yard and 12-yard * Belly dump trailer * Chemical injection truck, 20 bbl capacity * Three crane trucks: 6,000 lb., 8,000 lb., and 30 ton * Klaeger swab truck * Rig-up truck with 21-foot poles, 30,000-lb. capacity * Winch truck, 40,000-lb. capacity * Two bucket trucks: 25-foot and 28-foot reach * Two welding trucks with Miller Trailblazer welder * Two Ditch Witches: 8" x 7' and 6" x 3" * International PayStar 5000 transport truck * Western Star transport truck Backhoes & Loaders * John Deere 410G backhoe * Cat 420 backhoe * Case 20W loader with 2-yard bucket * Bobcat skid loader with bucket, forks, post hole digger, and trencher attachments

74

List of Processing and Manufacturing Equipment Incentives | Open Energy  

Open Energy Info (EERE)

Equipment Incentives Equipment Incentives Jump to: navigation, search The following contains the list of 130 Processing and Manufacturing Equipment Incentives. CSV (rows 1 - 130) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active AEP Ohio - Commercial Custom Project Rebate Program (Ohio) Utility Rebate Program Ohio Commercial Fed. Government Industrial Institutional Local Government Nonprofit Schools State Government Tribal Government Boilers Central Air conditioners Chillers Custom/Others pending approval Furnaces Heat pumps Heat recovery Lighting Lighting Controls/Sensors Processing and Manufacturing Equipment Refrigerators Yes AEP Ohio - Commercial Self Direct Rebate Program (Ohio) Utility Rebate Program Ohio Commercial Fed. Government Industrial

75

MARSAME Initial Assessment of Materials and Equipment 2 INITIAL ASSESSMENT OF MATERIALS AND EQUIPMENT  

E-Print Network (OSTI)

AND EQUIPMENT 2.1 Introduction The initial assessment (IA) is the first step in the investigation of materials Survey and Site Investigation Manual (MARSSIM 2002). The purpose of the IA is to collect and evaluate of impacted M&E (e.g., clearance, increased radiological controls, remediation, or disposal). Project managers

76

Property:Incentive/EquipReqs | Open Energy Information  

Open Energy Info (EERE)

EquipReqs EquipReqs Jump to: navigation, search Property Name Incentive/EquipReqs Property Type Text Description Equipment Requirements. Pages using the property "Incentive/EquipReqs" Showing 25 pages using this property. (previous 25) (next 25) A AEP (Central and North) - CitySmart Program (Texas) + New Construction and Retrofit/Renovation projects that reduce peak kW demand AEP (Central and North) - Residential Energy Efficiency Programs (Texas) + See program web site AEP (Central and SWEPCO) - Coolsaver A/C Tune Up (Texas) + Customer must accept recommendations from a tune-up analysis. AEP (Central, North and SWEPCO) - Commercial Solutions Program (Texas) + New Construction and Retrofit/Renovation projects that reduce peak kW demand AEP (SWEPCO) - Residential Energy Efficiency Programs (Texas) + View program web site and contact AEP

77

Digital optical conversion module  

DOE Patents (OSTI)

A digital optical conversion module used to convert an analog signal to a computer compatible digital signal including a voltage-to-frequency converter, frequency offset response circuitry, and an electrical-to-optical converter. Also used in conjunction with the digital optical conversion module is an optical link and an interface at the computer for converting the optical signal back to an electrical signal. Suitable for use in hostile environments having high levels of electromagnetic interference, the conversion module retains high resolution of the analog signal while eliminating the potential for errors due to noise and interference. The module can be used to link analog output scientific equipment such as an electrometer used with a mass spectrometer to a computer.

Kotter, Dale K. (North Shelley, ID); Rankin, Richard A. (Ammon, ID)

1991-02-26T23:59:59.000Z

78

Digital optical conversion module  

DOE Patents (OSTI)

A digital optical conversion module used to convert an analog signal to a computer compatible digital signal including a voltage-to-frequency converter, frequency offset response circuitry, and an electrical-to-optical converter. Also used in conjunction with the digital optical conversion module is an optical link and an interface at the computer for converting the optical signal back to an electrical signal. Suitable for use in hostile environments having high levels of electromagnetic interference, the conversion module retains high resolution of the analog signal while eliminating the potential for errors due to noise and interference. The module can be used to link analog output scientific equipment such as an electrometer used with a mass spectrometer to a computer. 2 figs.

Kotter, D.K.; Rankin, R.A.

1988-07-19T23:59:59.000Z

79

Equipment Certification | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Equipment Certification Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines Siting and Permitting Canada Commercial Construction Developer

80

A lessee's guide to leasing industrial equipment  

E-Print Network (OSTI)

Costing $10, 000 with 10- Year Depreciation Term and no Scrap Value Comparison of Five Methods of Acquiring Equipment Valued at $100, 000 with a Usable Life of 10 Years and no Scrap Value 10 III. Projected Earnings on Capital Freed by Leasing 13 IV... this tax saving results in the loss of one advantage of leasing. If, in the projection of the tax savings, it is found that the tax saving is inunaterial to the lessee, then it is quite possible that leasing will prove undesirable. But to those whose...

Johnson, Jones Eugene

1959-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

82

Early Equipment Management  

E-Print Network (OSTI)

starting with the ones that could cause the most human harm. This is also an excellent time to discuss all the lockout/tagout points on the machine, determine how much safety training is necessary and if there are enough warning stickers. The idea... needed. One-point lessons should be completed on all inspection, lubrication, and lockout/tagout points. Equipment labels should be created at this time including lockout/tagout and predetermined set-points. The key to a successful EEM program...

Schlie, Michelle

2007-05-18T23:59:59.000Z

83

China production equipment sourcing strategy  

E-Print Network (OSTI)

This thesis recommends a China business and equipment strategy for the Controls Conveyor Robotics Welding (CCRW) group at General Motors. The current strategy is to use globally common equipment through predetermined global ...

Chouinard, Natalie, 1979-

2009-01-01T23:59:59.000Z

84

Integrated Project Team RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Project Team (IPT) Review Module Integrated Project Team (IPT) Review Module March 2010 CD-0 This R O 0 Review Modul OFFICE OF Inte C CD-1 le was piloted F ENVIRO Standard R grated P Rev Critical Decis CD-2 M at the OR U 23 incorporated ONMENTAL Review Plan Project Te view Module sion (CD) Ap CD March 2010 33 Disposition in the Review L MANAGE n (SRP) eam (IPT e pplicability D-3 Project in 200 Module. EMENT T) CD-4 09. Lessons lea Post Ope arned have been eration n Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

85

IAEA safeguards equipment  

Science Journals Connector (OSTI)

The International Atomic Energy Agency (IAEA) operates a large diversity of equipment to verify nuclear materials, contributing to the confirmation of the states' compliance with their respective nonproliferation obligations. The variety of physical and chemical properties of nuclear materials, as well as their storage environment, requires an arsenal of instruments. Additionally, the IAEA applies various containment and surveillance measures to maintain the continuity of knowledge on nuclear materials. The IAEA need ongoing equipment development to provide its inspectorate with the state-of-the-art tools for performing various safeguards activities. These activities include the measurement of declared nuclear material inventories and flows, the application of enhanced containment and surveillance measures and the search for the indicators of undeclared nuclear material and clandestine nuclear activities. The IAEA is facing increasing demands to perform remote verification of nuclear material flows utilising unattended monitoring systems. Additional analytical capabilities and effective non-destructive assay methods will be indispensable in the future for reinforcing the IAEA's ability to detect undeclared nuclear materials and activities.

M. Zendel

2008-01-01T23:59:59.000Z

86

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

87

Liquid Fuels Market Module  

U.S. Energy Information Administration (EIA) Indexed Site

Liquid Fuels Market Module Liquid Fuels Market Module This page inTenTionally lefT blank 145 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Liquid Fuels Market Module The NEMS Liquid Fuels Market Module (LFMM) projects petroleum product prices and sources of supply for meeting petroleum product demand. The sources of supply include crude oil (both domestic and imported), petroleum product imports, unfinished oil imports, other refinery inputs (including alcohols, ethers, esters, corn, biomass, and coal), natural gas plant liquids production, and refinery processing gain. In addition, the LFMM projects capacity expansion and fuel consumption at domestic refineries. The LFMM contains a linear programming (LP) representation of U.S. petroleum refining

88

Microsoft PowerPoint - FinalModule3.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Project Scheduling 3: Project Scheduling Prepared by: Module 3 - Project Scheduling 1 Prepared by: Booz Allen Hamilton Module 3: Project Scheduling Welcome to Module 3. The objective of this module is to introduce you to Project Scheduling. The Topics that will be addressed in this Module include: * Define Planning vs. Scheduling * Define and Illustrate Basic Scheduling Concepts * Define Logic Relationships and Critical Path * Define and Illustrate Different Schedule Formats Module 3 - Project Scheduling 2 Prepared by: Booz Allen Hamilton Review of Previous Modules Let's quickly review what has been covered in the previous modules. * In Module 1 we introduced you to earned value and the requirements for properly implementing an earned value management system (EVMS). * In Module 2 we discussed

89

PDSF Modules  

NLE Websites -- All DOE Office Websites (Extended Search)

Modules Modules Modules Modules Approach to Managing The Environment Modules is a system which you can use to specify what software you want to use. If you want to use a particular software package loading its module will take care of the details of modifying your environment as necessary. The advantage of the modules approach is that the you are not required to explicitly specify paths for different executable versions and try to keep their related man paths and environment variables coordinated. Instead you simply "load" and "unload" specific modules to control your environment. Getting Started with Modules If you're using the standard startup files on PDSF then you're already setup for using modules. If the "module" command is not available, please

90

Commercial Demand Module  

Gasoline and Diesel Fuel Update (EIA)

2 2 Commercial Demand Module The NEMS Commercial Sector Demand Module generates projections of commercial sector energy demand through 2035. The definition of the commercial sector is consistent with EIA's State Energy Data System (SEDS). That is, the commercial sector includes business establishments that are not engaged in transportation or in manufacturing or other types of industrial activity (e.g., agriculture, mining or construction). The bulk of commercial sector energy is consumed within buildings; however, street lights, pumps, bridges, and public services are also included if the establishment operating them is considered commercial. Since most of commercial energy consumption occurs in buildings, the commercial module relies on the data from the EIA

91

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

92

Measured Peak Equipment Loads in Laboratories  

E-Print Network (OSTI)

of measured equipment load data for laboratories, designersmeasured peak equipment load data from 39 laboratory spacesmeasured equipment load data from various laboratory spaces

Mathew, Paul A.

2008-01-01T23:59:59.000Z

93

Electrical Equipment Inventory and Inspection Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrical Equipment Inventory and Inspection Information APS Non-NRTL Electrical Equipment Inventory Spreadsheet ANL Recognized Reputable Electrical Equipment Manufacturer List as...

94

Definition: Smart Appliances And Equipment (Customer) | Open Energy  

Open Energy Info (EERE)

Appliances And Equipment (Customer) Appliances And Equipment (Customer) Jump to: navigation, search Dictionary.png Smart Appliances And Equipment (Customer) Home appliances and devices (i.e., thermostats, pool pumps, clothes washers/dryers, water heaters, etc.) that use wireless technology (i.e., ZigBee) to receive real-time data from the AMI system to control or modulate their operation.[1] Related Terms advanced metering infrastructure, smart grid References ↑ [www.smartgrid.gov/sites/default/files/pdfs/description_of_assets.pdf SmartGrid.gov 'Description of Assets'] An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Smart_Appliances_And_Equipment_(Customer)&oldid=493118"

95

GHPsRUS Project  

SciTech Connect

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

2013-07-09T23:59:59.000Z

96

Information technology equipment cooling system  

SciTech Connect

According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

Schultz, Mark D.

2014-06-10T23:59:59.000Z

97

INL '@work' heavy equipment mechanic  

ScienceCinema (OSTI)

INL's Cad Christensen is a heavy equipment mechanic. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

Christensen, Cad

2013-05-28T23:59:59.000Z

98

Commercial Kitchen & Food Service Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Commercial Commercial Industrial Lighting Energy Smart Grocer Program HVAC Program Shell Measures Commercial Kitchen & Food Service Equipment Plug Load New...

99

Quantum modulation against electromagnetic interference  

E-Print Network (OSTI)

Periodic signals in electrical and electronic equipment can cause interference in nearby devices. Randomized modulation of those signals spreads their energy through the frequency spectrum and can help to mitigate electromagnetic interference problems. The inherently random nature of quantum phenomena makes them a good control signal. I present a quantum modulation method based on the random statistics of quantum light. The paper describes pulse width modulation schemes where a Poissonian light source acts as a random control that spreads the energy of the potential interfering signals. I give an example application for switching-mode power supplies and comment the further possibilities of the method.

Juan Carlos Garcia-Escartin

2014-11-26T23:59:59.000Z

100

Commercial Cooking Equipment | Open Energy Information  

Open Energy Info (EERE)

Cooking Equipment Incentives Retrieved from "http:en.openei.orgwindex.php?titleCommercialCookingEquipment&oldid38063...

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Food Service Equipment | Open Energy Information  

Open Energy Info (EERE)

Service Equipment Incentives Retrieved from "http:en.openei.orgwindex.php?titleFoodServiceEquipment&oldid380620...

102

Photovoltaic concentrator module improvements study  

SciTech Connect

This report presents results of a project to design and fabricate an improved photovoltaic concentrator module. Using previous work as a baseline, this study conducted analyses and testing to select major module components and design features. The lens parquet and concentrator solar cell were selected from the highest performing, available components. A single 185X point-focus module was fabricated by the project team and tested at Sandia. Major module characteristics include a 6 by 4 compression-molded acrylic lens parquet (0.737 m{sup 2} area), twenty-four 0.2 ohms-cm, FZ, p-Si solar cells (1.56 cm{sup 2} area) soldered to ceramic substrates and copper heat spreaders, and an aluminized steel housing with corrugated bottom. This project marked the first attempt to use prismatic covers on solar cells in a high-concentration, point-focus application. Cells with 15 percent metallization were obtained, but problems with the fabrication and placement of prismatic covers on these cells lead to the decision not to use covers in the prototype module. Cell assembly fabrication, module fabrication, and module optical design activities are presented here. Test results are also presented for bare cells, cell assemblies, and module. At operating conditions of 981 watts/m{sup 2} DNI and an estimated cell temperature of 65{degrees}C, the module demonstrated an efficiency of 13.9 percent prior to stressed environmental exposure. 12 refs., 56 figs., 7 tabs.

Levy, S.L.; Kerschen, K.A. (Black and Veatch, Kansas City, MO (United States)); Hutchison, G. (Solar Kinetics, Inc., Dallas, TX (United States)); Nowlan, M.J. (Spire Corp., Bedford, MA (United States))

1991-08-01T23:59:59.000Z

103

Commercial Demand Module  

Gasoline and Diesel Fuel Update (EIA)

4 4 The commercial module forecasts consumption by fuel 15 at the Census division level using prices from the NEMS energy supply modules, and macroeconomic variables from the NEMS Macroeconomic Activity Module (MAM), as well as external data sources (technology characterizations, for example). Energy demands are forecast for ten end-use services 16 for eleven building categories 17 in each of the nine Census divisions (see Figure 5). The model begins by developing forecasts of floorspace for the 99 building category and Census division combinations. Next, the ten end-use service demands required for the projected floorspace are developed. The electricity generation and water and space heating supplied by distributed generation and combined heat and power technologies are projected. Technologies are then

104

Coal Market Module This  

Gasoline and Diesel Fuel Update (EIA)

51 51 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Coal Market Module The NEMS Coal Market Module (CMM) provides projections of U.S. coal production, consumption, exports, imports, distribution, and prices. The CMM comprises three functional areas: coal production, coal distribution, and coal exports. A detailed description of the CMM is provided in the EIA publication, Coal Market Module of the National Energy Modeling System 2012, DOE/EIA-M060(2012) (Washington, DC, 2012). Key assumptions Coal production The coal production submodule of the CMM generates a different set of supply curves for the CMM for each year of the projection. Forty-one separate supply curves are developed for each of 14 supply regions, nine coal types (unique combinations

105

Coal Market Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 153 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Coal Market Module The NEMS Coal Market Module (CMM) provides projections of U.S. coal production, consumption, exports, imports, distribution, and prices. The CMM comprises three functional areas: coal production, coal distribution, and coal exports. A detailed description of the CMM is provided in the EIA publication, Coal Market Module of the National Energy Modeling System 2011, DOE/EIA-M060(2011) (Washington, DC, 2011). Key assumptions Coal production The coal production submodule of the CMM generates a different set of supply curves for the CMM for each year of the projection. Forty-one separate supply curves are developed for each of 14 supply regions, nine coal types (unique combinations

106

Project Execution Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

107

Renewable Fuels Module This  

U.S. Energy Information Administration (EIA) Indexed Site

Fuels Module Fuels Module This page inTenTionally lefT blank 175 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Renewable Fuels Module The NEMS Renewable Fuels Module (RFM) provides natural resources supply and technology input information for projections of new central-station U.S. electricity generating capacity using renewable energy resources. The RFM has seven submodules representing various renewable energy sources: biomass, geothermal, conventional hydroelectricity, landfill gas, solar thermal, solar photovoltaics, and wind [1]. Some renewables, such as landfill gas (LFG) from municipal solid waste (MSW) and other biomass materials, are fuels in the conventional sense of the word, while others, such as water, wind, and solar radiation, are energy sources that do not involve

108

EIA - Assumptions to the Annual Energy Outlook 2010 - Coal Market Module  

Gasoline and Diesel Fuel Update (EIA)

Coal Market Module Coal Market Module Assumptions to the Annual Energy Outlook 2010 Coal Market Module The NEMS Coal Market Module (CMM) provides projections of U.S. coal production, consumption, exports, imports, distribution, and prices. The CMM comprises three functional areas: coal production, coal distribution, and coal exports. A detailed description of the CMM is provided in the EIA publication, Coal Market Module of the National Energy Modeling System 2010, DOE/EIA-M060(2010) (Washington, DC, 2010). Key Assumptions Coal Production The coal production submodule of the CMM generates a different set of supply curves for the CMM for each year of the projection. Forty separate supply curves are developed for each of 14 supply regions, nine coal types (unique combinations of thermal grade and sulfur content), and two mine types (underground and surface). Supply curves are constructed using an econometric formulation that relates the minemouth prices of coal for the supply regions and coal types to a set of independent variables. The independent variables include: capacity utilization of mines, mining capacity, labor productivity, the user cost of capital of mining equipment, the cost of factor inputs (labor and fuel), and other mine supply costs.

109

EIA - Assumptions to the Annual Energy Outlook 2008 - Coal Market Module  

Gasoline and Diesel Fuel Update (EIA)

Coal Market Module Coal Market Module Assumptions to the Annual Energy Outlook 2008 Coal Market Module The NEMS Coal Market Module (CMM) provides projections of U.S. coal production, consumption, exports, imports, distribution, and prices. The CMM comprises three functional areas: coal production, coal distribution, and coal exports. A detailed description of the CMM is provided in the EIA publication, Coal Market Module of the National Energy Modeling System 2008, DOE/EIA-M060(2008) (Washington, DC, 2008). Key Assumptions Coal Production The coal production submodule of the CMM generates a different set of supply curves for the CMM for each year of the projection. Forty separate supply curves are developed for each of 14 supply regions, nine coal types (unique combinations of thermal grade and sulfur content), and two mine types (underground and surface). Supply curves are constructed using an econometric formulation that relates the minemouth prices of coal for the supply regions and coal types to a set of independent variables. The independent variables include: capacity utilization of mines, mining capacity, labor productivity, the user cost of capital of mining equipment, and the cost of factor inputs (labor and fuel).

110

Low Cost Solar Array Project cell and module formation research area. Process research of non-CZ silicon material. Final report, November 26, 1980-September 30, 1983  

SciTech Connect

The primary objective of the work reported was to investigate high-risk, high-payoff research areas associated with the Westinghouse process for producing photovoltaic modules using non-Czochralski sheet material. These tasks were addressed: technical feasibility study of forming front and back junctions using liquid dopant techniques, liquid diffusion mask feasibility study, application studies of antireflective material using a meniscus coater, ion implantation compatibility/feasibility study, and cost analysis. (LEW)

Campbell, R.B.

1983-01-01T23:59:59.000Z

111

Plant design: Integrating Plant and Equipment Models  

SciTech Connect

Like power plant engineers, process plant engineers must design generating units to operate efficiently, cleanly, and profitably despite fluctuating costs for raw materials and fuels. To do so, they increasingly create virtual plants to enable evaluation of design concepts without the expense of building pilot-scale or demonstration facilities. Existing computational models describe an entire plant either as a network of simplified equipment models or as a single, very detailed equipment model. The Advanced Process Engineering Co-Simulator (APECS) project (Figure 5) sponsored by the U.S. Department of Energy's National Energy Technology Laboratory (NETL) seeks to bridge the gap between models by integrating plant modeling and equipment modeling software. The goal of the effort is to provide greater insight into the performance of proposed plant designs. The software integration was done using the process-industry standard CAPE-OPEN (Computer Aided Process EngineeringOpen), or CO interface. Several demonstration cases based on operating power plants confirm the viability of this co-simulation approach.

Sloan, David (Alstrom Power); Fiveland, Woody (Alstrom Power); Zitney, S.E.; Osawe, Maxwell (Ansys, Inc.)

2007-08-01T23:59:59.000Z

112

Acquisition of Scientific Equipment  

SciTech Connect

Whitworth University constructed a 63,00 sq. ft. biology and chemistry building which opened in the Fall of 2011. This project provided for new state-of-the-art science instrumentation enabling Whitworth students to develop skills and knowledge that are directly transferable to practical applications thus enhancing Whitworth student's ability to compete and perform in the scientific workforce. Additionally, STEM faculty undertake outreach programs in the area schools, bringing students to our campus to engage in activities with our science students. The ability to work with insturmentation that is current helps to make science exciting for middle school and high school students and gets them thinking about careers in science. 14 items were purchased following the university's purchasing policy, that benefit instruction and research in the departments of biology, chemistry, and health sciences. They are: Cadaver Dissection Tables with Exhaust Chamber and accessories, Research Microscope with DF DIC, Phase and Fluorescence illumination with DP72 Camera, Microscope with Fluorescence, Microcomputer controlled ultracentrifuge, Ultracentrifuge rotor, Variable Temperature steam pressure sterilizer, Alliance APLC System, DNA Speedvac, Gel Cocumentation System, BioPac MP150, Glovebox personal workstation,Lyophilizer, Nano Drop 2000/2000c Spectrophotometer, C02 Incubator.

Noland, Lynn [Director, Sponsored Programs] [Director, Sponsored Programs

2014-05-16T23:59:59.000Z

113

TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS  

SciTech Connect

The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive.

NA

1997-09-29T23:59:59.000Z

114

Construction Project Safety and Health Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The Construction Project Safety and Health Plan (CPSHP) Review Module is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the project readiness in...

115

Module Configuration  

DOE Patents (OSTI)

A stand alone battery module including: (a) a mechanical configuration; (b) a thermal management configuration; (c) an electrical connection configuration; and (d) an electronics configuration. Such a module is fully interchangeable in a battery pack assembly, mechanically, from the thermal management point of view, and electrically. With the same hardware, the module can accommodate different cell sizes and, therefore, can easily have different capacities. The module structure is designed to accommodate the electronics monitoring, protection, and printed wiring assembly boards (PWAs), as well as to allow airflow through the module. A plurality of modules may easily be connected together to form a battery pack. The parts of the module are designed to facilitate their manufacture and assembly.

Oweis, Salah (Ellicott City, MD); D'Ussel, Louis (Bordeaux, FR); Chagnon, Guy (Cockeysville, MD); Zuhowski, Michael (Annapolis, MD); Sack, Tim (Cockeysville, MD); Laucournet, Gaullume (Paris, FR); Jackson, Edward J. (Taneytown, MD)

2002-06-04T23:59:59.000Z

116

Laboratory Equipment Donation Program - Guidelines  

Office of Scientific and Technical Information (OSTI)

The United States Department of Energy, in accordance with its The United States Department of Energy, in accordance with its responsibility to encourage research and development in the energy area, awards grants of used energy-related laboratory equipment. Universities, colleges and other non-profit educational institutions of higher learning in the United States are eligible to apply for equipment to use in energy-oriented educational programs in the life, physical, and environmental sciences, and in engineering. The equipment listed in this database is available for grant; however, specific items may be recalled for DOE use and become unavailable through the program. Frequently Asked Questions Who is eligible to apply for equipment? Any non-profit, educational institution of higher learning, such as a middle school, high school, university, college, junior college, technical

117

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Single Package Vertical Air Conditioners and Heat Pumps Single Package Vertical Air Conditioners and Heat Pumps Sign up for e-mail updates on regulations for this and other products Manufacturers have been required to comply with the Department of Energy's energy conservation standards for single package vertical air conditioners and heat pumps as a separate equipment class since 2008. Before 2010, this equipment was regulated under the broader scope of commercial air conditioning and heating equipment. Single package vertical air conditioners and heat pumps are commercial air conditioning and heating equipment with its main components arranged in a vertical fashion. They are mainly used in modular classrooms, modular office buildings, telecom shelters, and hotels, and are typically installed on the outside of an exterior wall or in a closet against an exterior wall but inside the building.

118

LANSCE | Lujan Center | Ancillary Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Ancillary Equipment Ancillary Equipment For general questions, please contact the Lujan Center Sample Environments responsible: Victor Fanelli | vfanelli@lanl.gov | 505.667.8755 Sample and Equipment Shipping Instructions For questions regarding shipping procedures, contact Lujan Center Experiment Coordinator: Leilani Conradson | leilani@lanl.gov | 505.665.9505 Low Temperature Equipment Specifications Flight Path/Instrument Compatibility Responsible Displex closed-cycle refrigerators Tmin= 4 K to 12 K Tmax= 300 K to 340 K 11 - Asterix 04 - HIPPO 03 - HIPD 10 - LQD 02 - SMARTS Victor Fanelli vfanelli@lanl.gov Or particular instrument scientist Top loading closed-cycle refrigerator T = 10 K to 500 K option of in situ gas adsorption cell 07 - FDS Luke Daemon lld@lanl.gov Monika Hartl hartl@lanl.gov

119

Equipment Inventory | Sample Preparation Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources Title Equipment Type Facility Laboratory Building Room Accumet Basic AB15 pH meter pH Meter SSRL BioChemMat Prep Lab 2 131 209 Agate Mortar & Pestle Sets Agilent 8453...

120

Earth-Fault Relay Equipment  

Science Journals Connector (OSTI)

... proving the reliability of the equipment. By Observing the operation of the relays at each substation with faults at selected points, the complete scheme can be put into operation with ...

1944-04-15T23:59:59.000Z

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Certified APS Electrical Equipment Inspectors  

NLE Websites -- All DOE Office Websites (Extended Search)

APS Designated Electrical Equipment Inspectors : Division Phone Page e-mail Jonathan Baldwin XSD 2-6977 4-6977 jbaldwin@aps.anl.gov Adam Brill ASD 2-9968 4-4559 abrill@aps.anl.gov...

122

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Direct Heating Equipment and Pool Heaters Active Mode Test Procedures Direct Heating Equipment and Pool Heaters Active Mode Test Procedures Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) is proposing to amend the active mode test procedures for direct heating equipment and pool heaters. This rulemaking is mandated by the Energy Policy and Conservation Act (EPCA). Recent Updates | Public Meeting Information | Submitting Public Comments | Milestones and Documents | Related Rulemakings | Statutory Authority | Contact Information Recent Updates DOE published a notice of proposed rulemaking regarding active mode test procedures for direct heating equipment and pool heaters. 78 FR 63410 (October 24, 2013). The comment deadline is January 7, 2014. Public Meeting Information

123

Pantex installs new high explosives equipment | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

124

Pantex installs new high explosives equipment | National Nuclear Security  

National Nuclear Security Administration (NNSA)

high explosives equipment | National Nuclear Security high explosives equipment | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Pantex installs new high explosives equipment Pantex installs new high explosives equipment Posted By Office of Public Affairs Joel Ramos works with the lathe. Big jobs are nothing new for the Projects Division at Pantex, and the

125

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

126

Southwest Gas Corporation - Commercial Energy Efficient Equipment Rebate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Energy Efficient Equipment Commercial Energy Efficient Equipment Rebate Program Southwest Gas Corporation - Commercial Energy Efficient Equipment Rebate Program < Back Eligibility Commercial Savings Category Heating & Cooling Commercial Heating & Cooling Heating Other Appliances & Electronics Water Heating Maximum Rebate General: 50% of purchase price Custom: $20,000 Program Info Expiration Date 12/15/2013 State Nevada Program Type Utility Rebate Program Rebate Amount Air Curtain: $1,950 Modulating Burner Control: $10,000 Boiler Steam Trap: $250 Non-condensing Boiler: $1/MBtuh Condensing Boiler: $1.25/MBtuh Clothes Dryer: $30 Custom: $1/therm up to $20,000 Convection Oven: $550 Conveyor Oven: $300-$750 Dishwasher: $1,050-$2,000 Energy Audit: $5,000/facility; $50,000/customer Furnace (Northern Nevada Only): $300-$500

127

Southwest Gas Corporation - Commercial High-Efficiency Equipment Rebate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwest Gas Corporation - Commercial High-Efficiency Equipment Southwest Gas Corporation - Commercial High-Efficiency Equipment Rebate Program Southwest Gas Corporation - Commercial High-Efficiency Equipment Rebate Program < Back Eligibility Commercial Industrial Savings Category Other Appliances & Electronics Commercial Weatherization Commercial Heating & Cooling Water Heating Maximum Rebate General: 50% of price Boiler Steam Trap: 25% of price Program Info State Arizona Program Type Utility Rebate Program Rebate Amount Modulating Burner Control: $10,000 Boiler O2 Trim Control Pad: $10,000 Boiler Steam Trap: $250 Non-condensing Boiler: $1/MBtuh Condensing Boiler: $1.25/MBtuh Storage Water Heater: 50% of cost, up to $1,100 Tankless Water Heater: 50% of cost, up to $450 Griddle: 50% of cost, up to $600 Fryer: 50% of cost, up to $1,350

128

Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a Compliance with the following permit will allow the installation and operation of electric vehicle charging equipment at a residence in the City, State jurisdiction. This permit addresses one of the following situations: Only an additional branch circuit would be added at the residence A hard-wired charging station would be installed at the residence. The attached requirements for wiring the charging station are taken directly out of the 2011 edition of the National Electrical Code (NEC) NFPA 70, Article 625 Electric Vehicle Charging System. This article does not provide all of the information necessary for the installation of electric vehicle charging equipment. Please refer to the current edition of the electrical code adopted by the local jurisdiction for additional installation requirements. Reference to the 2011 NEC may be

129

Materials Selection Considerations for Thermal Process Equipment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Materials Selection Considerations for Thermal Process Equipment: A BestPractices Process Heating Technical Brief Materials Selection Considerations for Thermal Process Equipment:...

130

CRAD, Nuclear Facility Construction - Mechanical Equipment -...  

Office of Environmental Management (EM)

Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 June 26, 2012 Nuclear Facility...

131

Request an Inspection of User Electrical Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Request for an Electrical Equipment Inspection All APS User electronic and electrical equipment must be inspected before use in an experiment. Please ask your beamline to make...

132

Summary of Construction Equipment Tests and Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

Equipment Tests A series of tests were conducted by the APS Construction Vibration Measurement Task Force using various pieces of construction equipment at the APCF...

133

Best Management Practice #11: Commercial Kitchen Equipment  

Energy.gov (U.S. Department of Energy (DOE))

Commercial kitchen equipment represents a large set of water users in the non-residential sector. Water efficiency for commercial kitchen equipment is especially important because high volume...

134

Annual Energy Outlook with Projections to 2025  

Gasoline and Diesel Fuel Update (EIA)

Assumptions to the nnual Energy Outlook Assumptions to the nnual Energy Outlook EIA Glossary Assumptions to the Annual Energy Outlook 2004 Report #: DOE/EIA-0554(2004) Release date: February 2004 Next release date:February 2005 The Assumptions to the Annual Energy Outlook presents the major assumptions of the National Energy Modeling System (NEMS) used to generate the projections in the Annual Energy Outlook. Table of Contents Introduction Macroeconomic Activity Module International Energy Module Household Expenditures Module Residential Demand Module Commercial Demand Module Industrial Demand Module Transportation Demand Module Electricity Market Module Oil and Gas Supply Module Natural Gas Transmission and Distribution Module Petroleum Market Module Coal Market Module Renewable Fuels Module Appendix A Adobe Acrobat Logo

135

PNNL: EDO - Facilities & Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities & Equipment Facilities & Equipment Facilities Equipment Decades of government investment on and around the Pacific Northwest National Laboratory campus has made PNNL a business-friendly resource for conducting a wide range of research. As a mission-focused organization, we are dedicated to teaming with government agencies, industry and academia to address what we believe are among the nation's most pressing needs in the areas of energy, environment, national security, and fundamental science. But behind these important missions is a wealth of supporting capabilities including incubator space, research laboratories, and user facilities that may be just what your business needs. We invite you to learn more about how we can work with businesses as well as what research laboratories and user facilities are available.

136

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Test Procedures for Two-stage and Modulating Condensing Furnaces and Boilers Test Procedures for Two-stage and Modulating Condensing Furnaces and Boilers Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) is proposing to amend the test procedures for two-stage and modulating condensing furnaces and boilers. Recent Updates | Public Meeting Information | Submitting Public Comments | Milestones and Documents | Related Rulemakings | Statutory Authority | Contact Information Recent Updates DOE published a final rule regarding test procedures for two-stage and modulating condensing furnaces and boilers. 78 FR 41265 (July 10, 2013). DOE also published a technical correction to the final rule. 78 FR 53625 (August 30, 2013). Public Meeting Information No public meeting is scheduled at this time.

137

Shenyang Tendo New Energy Equipment Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Tendo New Energy Equipment Co Ltd Tendo New Energy Equipment Co Ltd Jump to: navigation, search Name Shenyang Tendo New Energy Equipment Co Ltd Place Shenyang, Liaoning Province, China Zip 110168 Sector Wind energy Product Wind power equipment manufacturer, also an investor in wind project engineering and wind project developemnt. It vows to form a complete wind indsutry value chain from equipment manufacture to wind farm development. Coordinates 41.788509°, 123.40612° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.788509,"lon":123.40612,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

138

Large Sheet Process Consolidation Project  

E-Print Network (OSTI)

The purpose of this project is to reduce labor costs through the consolidation of large sheet processes into the Beta and Alpha manufacturing plants. The consolidation of equipment and departments will allow for the reduction of indirect labor...

Johnson, Keith

2005-12-16T23:59:59.000Z

139

Financing Co-generation Projects  

E-Print Network (OSTI)

profit generated by energy intensive industries will not be sufficient to provide the capital required for both normal business expansion and energy conservation projects. Debt financing for energy saving equipment will adversely impact balance sheet...

Young, R.

1982-01-01T23:59:59.000Z

140

The PumaPaint Project  

Science Journals Connector (OSTI)

The PumaPaint Project is an online robot that allows World Wide Web users to ... . Each site allows control of a PUMA robot equipped with four paintbrushes, jars of red, green, blue and yellow paint and white pap...

Matthew R. Stein

2003-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Petroleum Market Module  

Gasoline and Diesel Fuel Update (EIA)

This page intentionally left blank This page intentionally left blank 137 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Petroleum Market Module The NEMS Petroleum Market Module (PMM) projects petroleum product prices and sources of supply for meeting petroleum product demand. The sources of supply include crude oil (both domestic and imported), petroleum product imports, unfinished oil imports, other refinery inputs (including alcohols, ethers, bioesters, corn, biomass, and coal), natural gas plant liquids production, and refinery processing gain. In addition, the PMM projects capacity expansion and fuel consumption at domestic refineries. The PMM contains a linear programming (LP) representation of U.S. refining activities in the five Petroleum Administration for

142

Petroleum Market Module  

Gasoline and Diesel Fuel Update (EIA)

This page inTenTionally lefT blank 135 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Petroleum Market Module The NEMS Petroleum Market Module (PMM) projects petroleum product prices and sources of supply for meeting petroleum product demand. The sources of supply include crude oil (both domestic and imported), petroleum product imports, unfinished oil imports, other refinery inputs (including alcohols, ethers, esters, corn, biomass, and coal), natural gas plant liquids production, and refinery processing gain. In addition, the PMM projects capacity expansion and fuel consumption at domestic refineries. The PMM contains a linear programming (LP) representation of U.S. refining activities in the five Petroleum Administration for

143

Equipment  

Science Journals Connector (OSTI)

...circuit can be included which will return the system to its previous state when power has been restored after a power failure. (Panellit, Inc., Dept. 197) * AUXILIARY RECORKFR may be used with the manufacturer's infrared spectropho-tometers to provide...

JOSHUA STERN

1958-08-01T23:59:59.000Z

144

Equipment  

Science Journals Connector (OSTI)

...polarized d-c or a-c voltage, or insulation resistance. Range of voltage measurement...Milli-microsecond Time Interval measuring device. SPECIFICATIONS INPUT PULSE RANGE: 5 105v COUNT STORAGE...its use in any convenient location. (Thermal Dynamic Products Inc., Dept. 247...

JOSHUA STERN

1958-08-08T23:59:59.000Z

145

Covered Product Category: Imaging Equipment  

Energy.gov (U.S. Department of Energy (DOE))

FEMP provides acquisition guidance and Federal efficiency requirements across a variety of product categories, including imaging equipment, which is covered by the ENERGY STAR program. Federal laws and requirements mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law.

146

Commercial Equipment Testing Enforcement Policies  

Energy.gov (U.S. Department of Energy (DOE))

In an exercise of its enforcement discretion, under specific conditions, DOE will not perform assessment testing, verification testing, or enforcement testing on units of certain types of commercial equipment if the manufacturer distributes in commerce an otherwise identical unit that does not have that feature.

147

Project Year Project Title  

E-Print Network (OSTI)

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

148

Project Year Project Team  

E-Print Network (OSTI)

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

149

Project Year Project Team  

E-Print Network (OSTI)

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

150

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

151

Laboratory Equipment & Supplies | Sample Preparation Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

Equipment & Supplies Equipment & Supplies John Bargar, SSRL Scientist Equipment is available to serve disciplines from biology to material science. All laboratories contain the following standard laboratory equipment: pH meters with standard buffers, analytical balances, microcentrifuges, vortex mixers, ultrasonic cleaning baths, magnetic stirrers, hot plates, and glassware. Most laboratories offer ice machines and cold rooms. Specialty storage areas for samples include a -80 freezer, argon and nitrogen glove boxes, radiation contamination areas, inert atmosphere chambers, and cold rooms. For specific information please see: Equipment Inventory Checkout Equipment & Supplies To view equipment inventory by laboratory, refer to the following pages: Biology Chemistry & Material Science Laboratory 1 Inventory

152

Recovery Act's HWCTR Project Empty of Equipment, Ready for Grouting...  

Office of Environmental Management (EM)

Act, the next phase has begun on decommissioning the Heavy Water Components Test Reactor (HWCTR) at the Savannah River Site (SRS). With the reactor building now empty...

153

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

154

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

155

Project Year Project Team  

E-Print Network (OSTI)

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

156

BASIS Equipment | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Equipment Equipment BASIS Schematic Schematic of the SNS Backscattering Spectrometer. Helium dewer cooling a sample Helium dewer cooling a sample (bird's eye view). The heart of the work in a typical experiment is setting up the sample in the desired environment. A typical neutron sample ranging from a millimeter to a few centimeters is placed in a specialized cylindrical can and sealed. For liquids, the backscattering instrument often uses an annular can, created by placing a smaller can within a larger can and inserting the liquid sample between the two cans. This picture shows a helium dewer cooling the environment encompassing the sample can, which has been lowered into the beam from the top of the scattering tank. Crystals Crystals. The backscattering spectrometer is defined by the reflection of specific

157

Football facility and equipment management  

Science Journals Connector (OSTI)

The paper investigates the subject of football facility and equipment management to present the key success factors and planning elements for consideration. The work is based on secondary data analysis and literature review, and the findings include both descriptive and prescriptive elements. The findings construct a theoretical basis for further development and provide football managers with explicit and practical advice on the subject. They further indicate that topics pertaining to football facility and equipment management are not and should not be viewed as independent tasks under a common umbrella. They are all part of a larger system with all aspects interrelated both at the planning and the operation stages. Moreover, they are found to be inextricably linked with the wider strategic and marketing processes and constitute a significant part of the value proposition of the club to its immediate customers, implicit customers, industry associates and wider society.

Nicos L. Kartakoullis; Alkis Thrassou; Demetris Vrontis; Thanos Kriemadis

2013-01-01T23:59:59.000Z

158

NEPA COMPLIANCE SURVEY J.-1{p Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

}:- }:- J.-1{p Project Information Project Title: Flowline leak @ 68-66-SX-34 Date: 1/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 011..- 1. What are the environmental Elimination of the flowline@ 68-66- SX-34. Dig up and locate leak. Take p ntaminated soil to land fann and impacts? record in log book. The duration of this project will be approx. 4-days. The equipment to be used is as follows backhoe, and welder. We will be eliminating the flowline and pumping to a tank set on location.So we don't 2. What is the legal location? have any leaks in the Mure. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and nwlewed by the Environmental Specialist and the DOE NEPA

159

Line Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

160

Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog  

SciTech Connect

This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

Not Available

1994-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Strategy Guideline: HVAC Equipment Sizing  

SciTech Connect

The heating, ventilation, and air conditioning (HVAC) system is arguably the most complex system installed in a house and is a substantial component of the total house energy use. A right-sized HVAC system will provide the desired occupant comfort and will run efficiently. This Strategy Guideline discusses the information needed to initially select the equipment for a properly designed HVAC system. Right-sizing of an HVAC system involves the selection of equipment and the design of the air distribution system to meet the accurate predicted heating and cooling loads of the house. Right-sizing the HVAC system begins with an accurate understanding of the heating and cooling loads on a space; however, a full HVAC design involves more than just the load estimate calculation - the load calculation is the first step of the iterative HVAC design procedure. This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, Florida. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

Burdick, A.

2012-02-01T23:59:59.000Z

162

Project Year Project Title  

E-Print Network (OSTI)

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

163

Project Year Project Team  

E-Print Network (OSTI)

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

164

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

165

Forrest County Geothermal Energy Project  

Energy.gov (U.S. Department of Energy (DOE))

Project objectives: Retrofit two county facilities with high efficiency geothermal equipment (The two projects combined comprise over 200,000 square feet). Design and Construct a demonstration Facility where the public can see the technology and associated savings. Work with established partnerships to further spread the application of geothermal energy in the region.

166

Accelerating projects  

SciTech Connect

This chapter describes work at ORNL in the period around 1950, when the laboratory was evolving from its original mission of research aimed at producing the atomic bomb, to a new mission, which in many ways was unclear. The research division from Y-12 merged with the laboratory, which gave an increased work force, access to a wide array of equipment, and the opportunity to work on a number of projects related to nuclear propulsion. The first major project was for a nuclear aircraft. From work on this program, a good share of the laboratories work in peaceful application of nuclear energy would spring. A major concern was the development of light weight shielding to protect the crew and materials in such a plane. To do such shielding work, the laboratory employed existing, and new reactors. The original plans called for the transfer of reactor work to Argonne, but because of their own research load, and the needs of the lab, new reactor projects were started at the lab. They included the Low Intensity Test Reactor, the Swimming Pool Reactor, the Bulk Shielding Reactor, the Tower Shielding Facility, and others. The laboratory was able to extend early work on calutrons to accelerator development, pursuing both electrostatic accelerators and cyclotrons. The aircraft project also drove the need for immense quantities of scientific data, with rapid analysis, which resulted the development of divisions aimed at information support and calculational support. The laboratory also expanded its work in the effects of radiation and cells and biological systems, as well as in health physics.

Not Available

1992-01-01T23:59:59.000Z

167

Abatement of Air Pollution: Air Pollution Control Equipment and Monitoring Equipment Operation (Connecticut)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations contain instructions for the operation and monitoring of air pollution control equipment, as well as comments on procedures in the event of equipment breakdown, failure, and...

168

Fire suppression and detection equipment  

SciTech Connect

Inspection and testing guidelines go beyond the 'Code of Federal Regulation'. Title 30 of the US Code of Federal Regulations (30 CFR) contains requirements and references to national standards for inspection, testing and maintenance of fire suppression and detection equipment for mine operators. However, federal requirements have not kept pace with national standards and best practices. The article lists National Fire Protection (NFPA) standards that are referenced by the US Mine Safety and Health Administration (MSHA) in 30 CFR. It then discusses other NFPA Standards excluded from 30 CFR and explains the NFPA standard development process. 2 refs., 3 tabs., 5 photos.

E.E. Bates [HSB Professional Loss Control, Lexington, KY (United States)

2006-01-15T23:59:59.000Z

169

Laboratory Equipment Donation Program - Application Process  

Office of Scientific and Technical Information (OSTI)

Equipment listings on the LEDP web site are obtained from the U.S. General Equipment listings on the LEDP web site are obtained from the U.S. General Services Administration (GSA) Energy Asset Disposal System (EADS). Once equipment is listed, EADS allows 30 days for grantees from eligible institutions to apply for it on the LEDP site. Equipment Condition Codes are found near the top of the "LEDP Equipment Information" page for each item. The condition of equipment is graded as follows: 1: Unused Good Condition 4: Used Good Condition 7: Repairable Requires Repairs X: Salvage Salvage S: Scrap Scrap Specific questions concerning equipment should be directed to the point of contact responsible for the item(s) under consideration. This information is listed on the "Equipment Information" page, as well as on the grant

170

INL Equipment to Aid Regional Response Team  

NLE Websites -- All DOE Office Websites (Extended Search)

INL Equipment to Aid Regional Response Team DOE-ID is transferring equipment to the Idaho Falls Police Department's Hazardous Materials Response Team for their use in responding to...

171

Operations and Maintenance for Major Equipment Types  

Energy.gov (U.S. Department of Energy (DOE))

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

172

Dental CBCT equipment and performance issues  

Science Journals Connector (OSTI)

......time due to insufficient dose audit data. For dental CBCT equipment...there are no large-scale audits of equipment in clinical use...http://ec.europa.eu/energy/nuclear/radiation_protection...http://ec.europa.eu/energy/nuclear/radioprotection......

K. Horner; R. Jacobs; R. Schulze

2013-02-01T23:59:59.000Z

173

Commercial Demand Module  

Gasoline and Diesel Fuel Update (EIA)

This page intentionally left blank This page intentionally left blank 39 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Commercial Demand Module The NEMS Commercial Sector Demand Module generates projections of commercial sector energy demand through 2035. The definition of the commercial sector is consistent with EIA's State Energy Data System (SEDS). That is, the commercial sector includes business establishments that are not engaged in transportation or in manufacturing or other types of industrial activity (e.g., agriculture, mining or construction). The bulk of commercial sector energy is consumed within buildings; however, street lights, pumps, bridges, and public services are also included if the establishment operating them is considered commercial.

174

Renewable Fuels Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 167 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Renewable Fuels Module The NEMS Renewable Fuels Module (RFM) provides natural resources supply and technology input information for projections of new central-station U.S. electricity generating capacity using renewable energy resources. The RFM has seven submodules representing various renewable energy sources: biomass, geothermal, conventional hydroelectricity, landfill gas, solar thermal, solar photovoltaics, and wind [1]. Some renewables, such as landfill gas (LFG) from municipal solid waste (MSW) and other biomass materials, are fuels in the conventional sense of the word, while others, such as water, wind, and solar radiation, are energy sources that do not involve the

175

Consider Steam Turbine Drives for Rotating Equipment  

Energy.gov (U.S. Department of Energy (DOE))

This tip sheet outlines the benefits of steam turbine drives for rotating equipment as part of optimized steam systems.

176

Proceedings: Tenth EPRI Substation Equipment Diagnostics Conference  

SciTech Connect

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The tenth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2002-06-01T23:59:59.000Z

177

Proceedings: Substation Equipment Diagnostics Conference IX  

SciTech Connect

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The ninth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2001-09-01T23:59:59.000Z

178

Proceedings: Substation Equipment Diagnostics Conference VIII  

SciTech Connect

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The eighth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2000-06-01T23:59:59.000Z

179

Post Critical Decision-4 Mark Arenaz, Federal Project Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

those elements of project requirements documents relative to electrical equipment and lockouttagout. Improvement Action Lesson learned has been incorporated into the prime...

180

Projectivities and Projective Embeddings  

Science Journals Connector (OSTI)

In this chapter, we aim to prove some of the main achievements in the theory of generalized polygons. First, we want to show what the little projective group and the groups of projectivities of some Moufang po...

Hendrik van Maldeghem

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Project Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

182

Project Year Project Title  

E-Print Network (OSTI)

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

183

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

184

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

185

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

186

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

187

Project Proposal Project Logistics  

E-Print Network (OSTI)

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

188

Solar Equipment Certification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Equipment Certification Solar Equipment Certification Solar Equipment Certification < Back Eligibility Construction General Public/Consumer Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Florida Program Type Equipment Certification Provider Florida Solar Energy Center Under the Solar Energy Standards Act of 1976, the Florida Solar Energy Center (FSEC) is responsible for certifying all solar equipment sold in Florida. A manufacturer who wishes to have their solar equipment certified first contacts FSEC for an application and requests that FSEC test samples of the product at random. Equipment is then subjected to a series of tests in order to be approved or denied certification. Standards and applications procedures for specific technologies are available on the FSEC web site.

189

Laboratory Equipment Donation Program - Contact Us  

Office of Scientific and Technical Information (OSTI)

End of Year Reports End of Year Reports At the end of the first year of using LEDP grant equipment, the grantee must provide DOE with a report on the use of the equipment. If a grantee does not submit a report, the DOE OPMO who approved the grant application can pull the equipment back, or not allow that institution to apply for more equipment. The report should describe: Any new courses instituted as a result of the grant of the equipment; Existing courses which have been expanded as a result of the grant of the equipment; Research activities, e.g., thesis titles, journals articles, sponsored research, etc.; and Other ways the equipment has been used to enhance courses, e.g., experiments, demonstrations, etc. If your item control Number starts with Send your report to 890565

190

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial and Industrial Pumps Commercial and Industrial Pumps Sign up for e-mail updates on regulations for this and other products Pumps are used in agriculture, oil and gas production, water and wastewater, manufacturing, mining, and commercial building systems. Currently there are no energy conservation standards for pumps. The Department of Energy (DOE) will conduct an analysis of the energy use, emissions, costs, and benefits associated with this equipment during the commercial and industrial pumps energy conservation standards rulemaking. Recent Updates | Standards | Test Procedures | Waiver, Exception, and Exemption Information | Statutory Authority | Historical Information | Contact Information Recent Updates DOE published a notice of public meeting and availability of the framework document. 78 FR 7304 (Feb. 1, 2013). For more information, please see the rulemaking page.

191

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial and Industrial Compressors Determination Commercial and Industrial Compressors Determination Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) proposes to determine that commercial and industrial compressors meet the criteria for covered equipment under Part A-1 of Title III of the Energy Policy and Conservation Act (EPCA), as amended. Recent Updates | Public Meeting Information | Submitting Public Comments | Milestones and Documents | Related Rulemakings | Statutory Authority | Contact Information Recent Updates DOE published a Proposed Coverage Determination concerning commercial and industrial compressors. 77 FR 76972 (Dec. 31, 2012). Public Meeting Information No public meeting is scheduled at this time. Submitting Public Comments The comment period is closed.

192

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Alternative Efficiency Determination Methods and Alternate Rating Methods Alternative Efficiency Determination Methods and Alternate Rating Methods Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) is proposing to revise and expand its existing regulations governing the use of alternative efficiency determination methods (AEDM) and alternate rating methods (ARM) for covered products as alternatives to testing for the purpose of certifying compliance. Recent Updates | Public Meeting Information | Submitting Public Comments | Milestones and Documents | Related Rulemakings | Statutory Authority | Contact Information Recent Updates DOE published a final rule revising its existing regulations governing the use of particular methods as alternatives to testing for commercial heating, ventilating, air conditioning, water heating, and refrigeration equipment. 78 FR 79579 (December 31, 2013).

193

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Illuminated Exit Signs Illuminated Exit Signs Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) has regulated the energy efficiency level of illuminated exit signs since 2005. Illuminated exit signs are used to indicate exit doors in schools, hospitals, libraries, government buildings, and commercial buildings of all kinds, including offices, restaurants, stores, auditoriums, stadiums, and movie theatres. Recent Updates | Standards | Test Procedures | Waiver, Exception, and Exemption Information | Statutory Authority | Historical Information | Contact Information Recent Updates There are no recent updates for this equipment. Standards for Illuminated Exit Signs The following content summarizes the energy conservation standards for illuminated exit signs. The text is not an official reproduction of the Code of Federal Regulations and should not be used for legal research or citation.

194

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Warm Air Furnaces Commercial Warm Air Furnaces Sign up for e-mail updates on regulations for this and other products The Department of Energy (DOE) has regulated the energy efficiency level of commercial warm air furnaces since 1994. Commercial warm air furnaces are self-contained oil-fired or gas-fired furnaces that are designed to supply heated air through ducts to spaces that require it. Commercial warm air furnaces are industrial equipment and have a maximum rated input capacity of 225,000 British thermal units (Btu) an hour or more. Recent Updates | Standards | Test Procedures | Waiver, Exception, and Exemption Information | Statutory Authority | Historical Information | Contact Information Recent Updates DOE published a request for information regarding energy conservation standards for commercial warm air furnaces. 78 FR 25627 (May 2, 2013). For more information, please see the rulemaking webpage.

195

Appliance and Equipment Standards Program  

Energy.gov (U.S. Department of Energy (DOE))

The Building Technologies Office (BTO) implements minimum energy conservation standards for more than 50 categories of appliances and equipment. As a result of these standards, energy users saved about $55 billion on their utility bills in 2013. Since the beginning of 2009, 25 new or updated standards have been issued, which will help increase annual savings by more than 50 percent over the next decade. By 2030, cumulative operating cost savings from all standards in effect since 1987 will reach over $1.7 trillion, with a cumulative reduction of 6.8 billion tons of carbon dioxide emissions, equivalent to the annual greenhouse gas emissions of 1.4 billion automobiles. Products covered by standards represent about 90% of home energy use, 60% of commercial building use, and 29% of industrial energy us

196

Final report: Efficient thyratron modulator project  

SciTech Connect

The purpose of this program was to examine methods of increasing the efficiency of producing pulses to drive Klystrons in the 150 MW range. This may include 2 Klystrons in the 75 MW range. Specific methods of interest to improve the pulse efficiency were the use of a circuit to add energy to the tail of the pulse, the use of a bipyrimidal transformer, and the use of gas insulation as a means of improving the pulse shape. These methods were investigated using both thyratron and IGBT switching. The low cost designs developed in this work consisted of low voltage designs which don't require the oil immersion. These designs can be ''hot tuned'' based on the use of simple, tunable inductors.

R. J. Adler; R. J. Richter-Sand; C. W. Gregg

1999-11-26T23:59:59.000Z

197

Cost estimate of initial SSC experimental equipment  

SciTech Connect

The cost of the initial detector complement at recently constructed colliding beam facilities (or at those under construction) has been a significant fraction of the cost of the accelerator complex. Because of the complexity of large modern-day detectors, the time-scale for their design and construction is comparable to the time-scale needed for accelerator design and construction. For these reasons it is appropriate to estimate the cost of the anticipated detector complement in parallel with the cost estimates of the collider itself. The fundamental difficulty with this procedure is that, whereas a firm conceptual design of the collider does exist, comparable information is unavailable for the detectors. Traditionally, these have been built by the high energy physics user community according to their perception of the key scientific problems that need to be addressed. The role of the accelerator laboratory in that process has involved technical and managerial coordination and the allocation of running time and local facilities among the proposed experiments. It seems proper that the basic spirit of experimentation reflecting the scientific judgment of the community should be preserved at the SSC. Furthermore, the formal process of initiation of detector proposals can only start once the SSC has been approved as a construction project and a formal laboratory administration put in place. Thus an ad hoc mechanism had to be created to estimate the range of potential detector needs, potential detector costs, and associated computing equipment.

NONE

1986-06-01T23:59:59.000Z

198

Nanjing Sunec Wind Generator Equipment Factory | Open Energy Information  

Open Energy Info (EERE)

Sunec Wind Generator Equipment Factory Sunec Wind Generator Equipment Factory Jump to: navigation, search Name Nanjing Sunec Wind Generator Equipment Factory Place Nanjing, Jiangsu Province, China Zip 211100 Sector Wind energy Product A Chinese manufacturer for power supply, grid automation equipment and small-to-medium wind turbines, as well as a wind project developer. Coordinates 32.0485°, 118.778969° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.0485,"lon":118.778969,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

199

Sound quality descriptors for HVAC equipment from ARI Standards  

Science Journals Connector (OSTI)

The Air Conditioning and Refrigeration Institute (ARI) has several standards that provide methods to evaluate the sound quality of heating ventilating and air?conditioning (HVAC) equipment. These include Standard 270 Sound rating of outdoor unitary equipment Standard 350 Sound rating of non?ducted indoor air?conditioning equipment and Standard 1140P Procedures for evaluating sound quality of HVAC equipment. The preferred method in these standards is best described in Standard 1140P which uses one?third octave band sound power levels that are weighted to adjust for the sensitivity to frequency distribution and presence of tones and are then converted to a single number sound quality indicator. The tone adjustment is based on the projection of a given one?third octave band level relative to the average of the adjacent one?third octave bands. An alternate use of Zwicker method B to determine loudness and loudness level is also provided in ARI Standard 1140P. These standards provide a convenient method by which complex sounds for similar products may be compared.

2003-01-01T23:59:59.000Z

200

Photovoltaic Energy Technology Module | Open Energy Information  

Open Energy Info (EERE)

Photovoltaic Energy Technology Module Photovoltaic Energy Technology Module Jump to: navigation, search Tool Summary Name: Photovoltaic Energy Technology Module Agency/Company /Organization: World Bank Sector: Energy Focus Area: Renewable Energy, Solar Topics: Technology characterizations Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, References: Photovoltaic Energy Technology Module[1] Resources Portable Solar Photovoltaic Lanterns: Performance and Certification Specification, and Type Approval, ESMAP TECHNICAL PAPER 078 Testing of Storage Batteries used in Stand Alone Photovoltaic Power Systems, Test procedures and examples of test results Technical Specifications for Solar Home Systems (SHS), Rural Electrification and Renewable Energy Development (PV Component) Project

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Early Markets: Fuel Cells for Material Handling Equipment | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Material Handling Equipment Early Markets: Fuel Cells for Material Handling Equipment This fact sheet describes the use of hydrogen fuel cells to power material handling equipment...

202

Step 5b: Help Program Contractors Obtain the Necessary Equipment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

b: Help Program Contractors Obtain the Necessary Equipment Step 5b: Help Program Contractors Obtain the Necessary Equipment In addition to equipment for installing energy...

203

Operations and Maintenance for Major Equipment Types | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Types Operations and Maintenance for Major Equipment Types Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly...

204

GT Solar Technologies formerly GT Equipment Technologies | Open Energy  

Open Energy Info (EERE)

GT Solar Technologies formerly GT Equipment Technologies GT Solar Technologies formerly GT Equipment Technologies Jump to: navigation, search Name GT Solar Technologies (formerly GT Equipment Technologies) Place Merrimack, New Hampshire Zip 3054 Product US-based manufacturer of turnkey multicrystalline PV wafer, cell, and module fabrication lines; also offers EFG and dentritic growth furnaces. Coordinates 42.872517°, -71.490603° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.872517,"lon":-71.490603,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

205

Dispensing Equipment Testing with Mid-Level Ethanol/Gasoline Test Fluid: Summary Report  

SciTech Connect

The National Renewable Energy Laboratory's (NREL) Nonpetroleum-Based Fuel Task addresses the hurdles to commercialization of biomass-derived fuels and fuel blends. One such hurdle is the unknown compatibility of new fuels with current infrastructure, such as the equipment used at service stations to dispense fuel into automobiles. The U.S. Department of Energy's (DOE) Vehicle Technology Program and the Biomass Program have engaged in a joint project to evaluate the potential for blending ethanol into gasoline at levels higher than nominal 10 volume percent. This project was established to help DOE and NREL better understand any potentially adverse impacts caused by a lack of knowledge about the compatibility of the dispensing equipment with ethanol blends higher than what the equipment was designed to dispense. This report provides data about the impact of introducing a gasoline with a higher volumetric ethanol content into service station dispensing equipment from a safety and a performance perspective.

Boyce, K.; Chapin, J. T.

2010-11-01T23:59:59.000Z

206

The National Transport Code Collaboration Module Library  

Science Journals Connector (OSTI)

This paper reports on the progress in developing a library of code modules under the auspices of the National Transport Code Collaboration (NTCC). Code modules are high quality, fully documented software packages with a clearly defined interface. The modules provide a variety of functions, such as implementing numerical physics models; performing ancillary functions such as I/O or graphics; or providing tools for dealing with common issues in scientific programming such as portability of Fortran codes. Researchers in the plasma community submit code modules, and a review procedure is followed to insure adherence to programming and documentation standards. The review process is designed to provide added confidence with regard to the use of the modules and to allow users and independent reviews to validate the claims of the modules' authors. All modules include source code; clear instructions for compilation of binaries on a variety of target architectures; and test cases with well-documented input and output. All the NTCC modules and ancillary information, such as current standards and documentation, are available from the NTCC Module Library Website http://w3.pppl.gov/NTCC. The goal of the project is to develop a resource of value to builders of integrated modeling codes and to plasma physics researchers generally. Currently, there are more than 40 modules in the module library.

A.H. Kritz; G. Bateman; J. Kinsey; A. Pankin; T. Onjun; A. Redd; D. McCune; C. Ludescher; A. Pletzer; R. Andre; L. Zakharov; L. Lodestro; L.D. Pearlstein; R. Jong; W. Houlberg; P. Strand; J. Wiley; P. Valanju; H.St. John; R. Waltz; J. Mandrekas; T.K. Mau; J. Carlsson; B. Braams

2004-01-01T23:59:59.000Z

207

Limestone and Ash Storage Silos and Lime Preparation Equipment, Part  

NLE Websites -- All DOE Office Websites (Extended Search)

Limestone and Ash Storage Silos and Lime Preparation Equipment, Part Limestone and Ash Storage Silos and Lime Preparation Equipment, Part of the System to Inject Limestone Sorbent for SO, Control. Nucla, CO Nucla...continued Before being repowered, the plant consisted of three 12 MWe coal stoker- fired units built in 1959, which were taken out of service in 1984 due to low efficiency and high fuel cost. Antici- pating a need for additional power in the early 1990s. and after review of many power generation alternatives, CUEA started constmction of the re- powered Nucla CFB plant in Novem- ber 1984 and completed the project in May 1987. The original boilers were replaced with a new Fympower Corp. CFB bailer, a new high pressure 74 MWe steam turbine generator was installed, the three original 12 MWe steam turbines were

208

Solar Equipment Certification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Equipment Certification Solar Equipment Certification Solar Equipment Certification < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Water Heating Program Info State Minnesota Program Type Equipment Certification Provider Minnesota Department of Commerce Minnesota law requires that all active solar space-heating and water-heating systems, sold, offered for sale, or installed on residential and commercial buildings in the state meet Solar Rating and Certification Corporation (SRCC) standards. Specifically, the rule references SRCC's "Operating Guidelines" pertaining to collector certification and system certification: OG-100 and OG-300, respectively. Local building officials

209

G129 S129 Equipment List Windbreaker  

E-Print Network (OSTI)

(optional) Water shoes (tevas or old tennis shoes) Gaitors (optional) COURSE EQUIPMENT*: Pocket or wrist operated) Bug Spray Deck of cards, musical instrument, Frisbee, etc (optional) * Textbooks should

Polly, David

210

PPP Equipment Corporation | Open Energy Information  

Open Energy Info (EERE)

Name: PPP Equipment Corporation Sector: Solar Product: PPP-E designs, produces and markets Chemical Vapor Deposition (CVD) reactors and converter systems producing high-purity...

211

Best Management Practice #11: Commercial Kitchen Equipment |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

savings. Water-using commercial kitchen equipment include pre-rinse spray valves, wash tanks and sinks, commercial dishwashers, food steamers, steam kettles, commercial ice...

212

Equips Nucleares SA | Open Energy Information  

Open Energy Info (EERE)

SA Place: Madrid, Spain Zip: 28006 Sector: Services Product: ENSA is a Spanish nuclear components and nuclear services supply company. References: Equips Nucleares, SA1...

213

MOV surge arresters: improved substation equipment protection  

SciTech Connect

The introduction of metal-oxide-varistor (MOV) surge arresters has added a new dimension to substation equipment protection. Through the optimal use of these arresters, it is possible to lower surge arrester ratings and thereby improve protective margins, resulting in a possible reduction of the insulation levels (BIL) of substation equipment. This reduction in BIL can lead to a significant reduction in the cost of substation equipment. General methods are delineated for selecting MOV surge arresters for substation protection and the resulting effect on substation equipment insulation levels.

Niebuhr, W.D.

1985-07-01T23:59:59.000Z

214

Reduce Radiation Losses from Heating Equipment  

Energy.gov (U.S. Department of Energy (DOE))

This tip sheet describes how to save process heating energy and costs by reducing expensive heat losses from industrial heating equipment, such as furnaces.

215

WEAR RESISTANT ALLOYS FOR COAL HANDLING EQUIPMENT  

E-Print Network (OSTI)

Proceedings of the Conference on Coal Feeding Systems, HeldWear Resistant Alloys for Coal Handling Equipment", proposalWear Resistant Alloys for Coal Handling Equi pment". The

Bhat, M.S.

2011-01-01T23:59:59.000Z

216

Computers, Electronics and Electrical Equipment (2010 MECS) ...  

Energy Savers (EERE)

Electronics and Electrical Equipment More Documents & Publications MECS 2006 - Computer, Electronics and Appliances Cement (2010 MECS) Glass and Glass Products (2010 MECS)...

217

Western Baldwin County, AL Grid Interconnection Project  

SciTech Connect

The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.

Thomas DeBell

2011-09-30T23:59:59.000Z

218

SSPA Equipment Engineering Feasibility Report  

SciTech Connect

In response to a demanding reactor conversion schedule, construction of the Shielded Sample Preparation Area (SSPA) was initiated in 2010 to augment the existing capabilities of the Hot Fuel Examination Facility (HFEF). While HFEF is and will remain the workhorse for post irradiation sample preparation, there is currently a large backlog of Post-Irradiation Examination (PIE) experiments caused by numerous competing projects (this backlog is expected to continue for the foreseeable future). HFEF, in its present configuration also lacks the ability to prepare samples suitable for several of the tests that have been identified for the successful conclusion of the RERTR program; these samples require fine detail machining of irradiated fuel plates.

N.E. Woolstenhulme; C.R. Clark

2011-09-01T23:59:59.000Z

219

Residential Demand Module  

Gasoline and Diesel Fuel Update (EIA)

and clothes drying. In addition to the major equipment-driven and clothes drying. In addition to the major equipment-driven end-uses, the average energy consumption per household is projected for other electric and nonelectric Energy Information Administration/Assumptions to the Annual Energy Outlook 2006 19 Pacific East South Central South Atlantic Middle Atlantic New England West South Central West North Central East North Central Mountain AK WA MT WY ID NV UT CO AZ NM TX OK IA KS MO IL IN KY TN MS AL FL GA SC NC WV PA NJ MD DE NY CT VT ME RI MA NH VA WI MI OH NE SD MN ND AR LA OR CA HI Middle Atlantic New England East North Central West North Central Pacific West South Central East South Central South Atlantic Mountain Figure 5. United States Census Divisions Source:Energy Information Administration,Office of Integrated Analysis and Forecasting. Report #:DOE/EIA-0554(2006) Release date: March 2006

220

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Date: 12120/2010 DOE Coda: Contractor Coda: Project Lead: Marcus Bruckner Project Overview 1 Dig ditch from 24-51-8TX-1 0 to 24-AX-10 and remove and replace electrical wire {N 2.7o') 1. Brief project desalptlon Pnclude anything that oould impact the 2. 24-51-5TX-10 and 24-AX-10 (SW r.tN 10TOWNSHIP 38 NORTH RANGE 78WEST) environment] 2. Leg allocation 3. 1 day 3. Duration of the project 4. Major equipment to be used 4. Backhoe The table below is to be completed by the Project Leed and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and contact the Technical Assurance Department.

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Safeguarding Equipment and Protecting Employees from  

E-Print Network (OSTI)

Safeguarding Equipment and Protecting Employees from Amputations www.osha.gov Small Business Safety of Labor for Occupational Safety and Health #12;Safeguarding Equipment and Protecting Employees from Activities 9 Hazard Analysis 9 Controlling Amputation Hazards 9 Safeguarding Machinery 9 Primary Safeguarding

Colton, Jonathan S.

222

Electrical Equipment Inspection Program Electrical Safety  

E-Print Network (OSTI)

Electrical Equipment Inspection Program Electrical Safety SLAC-I-730-0A11A-001-R003 23 March 2005 Document Title: Electrical Equipment Inspection Program Original Publication Date: 19 January 2005 Revised Publication Date: 23 March 2005 (updated 29 November 2010) Department: Electrical Safety Document Number: SLAC

Wechsler, Risa H.

223

Office equipment energy use and trends  

SciTech Connect

Office information technologies are using an increasing amount of energy in commercial buildings. During recent forecasting hearings in California, the office equipment end use has been a major source of differences among forecasts of commercial sector energy use. Not only are there major differences in forecasted load growth resulting from the energy use of office equipment, but there are also differences in interpretations of historical and base-year estimates. Understanding office equipment energy use is particularly important because office equipment is widely believed to be the fastest growing electrical end use in the fastest growing sector. This report describes the development and application of a spreadsheet to estimate current and future energy use by office equipment. We define the term ``office equipment`` to mean information processing technologies used in buildings. The seven categories of office equipment relate to categories found in our analysis of utility surveys and industry sales reports. These seven categories of equipment are examined for eleven types of commercial buildings.

Piette, M.A.; Eto, J.H.; Harris, J.P.

1991-09-01T23:59:59.000Z

224

Office equipment energy use and trends  

SciTech Connect

Office information technologies are using an increasing amount of energy in commercial buildings. During recent forecasting hearings in California, the office equipment end use has been a major source of differences among forecasts of commercial sector energy use. Not only are there major differences in forecasted load growth resulting from the energy use of office equipment, but there are also differences in interpretations of historical and base-year estimates. Understanding office equipment energy use is particularly important because office equipment is widely believed to be the fastest growing electrical end use in the fastest growing sector. This report describes the development and application of a spreadsheet to estimate current and future energy use by office equipment. We define the term office equipment'' to mean information processing technologies used in buildings. The seven categories of office equipment relate to categories found in our analysis of utility surveys and industry sales reports. These seven categories of equipment are examined for eleven types of commercial buildings.

Piette, M.A.; Eto, J.H.; Harris, J.P.

1991-09-01T23:59:59.000Z

225

Definition: Equipment Health Sensor | Open Energy Information  

Open Energy Info (EERE)

Sensor Sensor Jump to: navigation, search Dictionary.png Equipment Health Sensor Monitoring devices that automatically measure and communicate equipment characteristics that are related to the 'health' and maintenance of the equipment. These characteristics can include, but are not limited to temperature, dissolved gas, and loading. These devices can also automatically generate alarm signals if the equipment characteristics reach critical or dangerous levels.[1] Related Terms sustainability References ↑ [www.smartgrid.gov/sites/default/files/pdfs/description_of_assets.pdf SmartGrid.gov 'Description of Assets'] An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Health_Sensor&oldid=502526

226

Registration, Force Protection Equipment Demonstration - May 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Registration, Force Protection Equipment Demonstration - May 2009 Registration, Force Protection Equipment Demonstration - May 2009 Registration, Force Protection Equipment Demonstration - May 2009 May 2009 Demonstrating commercially availale physical security/force protection soultions around the world The bombing of Khobar Towers in Saudi Arabia on 25 June 1996 revealed the need for continal vigilance and protection againist terrorist forces intent on harming US personnel and interests. The Chairman if the Joint Chiefs of Staff directed the Services to investigate COTS equipments solutions for physical security/force protection needs. The Office of the Under Secretary of Defense for Acquistion, Technology, and Logistics (OUSD {at&l}) tasked the Office of the US Army Product Manager, force Protection Systems (PM-FPS), to coordiante and facilitate a Force Protection Equipment

227

RMOTC - Field Information - Equipment and Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Equipment & Facilities Equipment & Facilities Motor Grader at RMOTC Notice: As of July 15th 2013, the Department of Energy announced the intent to sell Naval Petroleum Reserve Number 3 (NPR3). The sale of NPR-3 will also include the sale of all equipment and materials onsite. A decision has been made by the Department of Energy to complete testing at RMOTC by July 1st, 2014. RMOTC will complete testing in the coming year with the currently scheduled testing partners. For more information on the sale of NPR-3 and sale of RMOTC equipment and materials please join our mailing list here. RMOTC's test facility has its own line of workover, support, and heavy equipment available for partner use on site. RMOTC can also offer its partners workspace on site in its Customer Operations Center which has

228

Office Buildings - End-Use Equipment  

U.S. Energy Information Administration (EIA) Indexed Site

End-Use Equipment End-Use Equipment The types of space heating equipment used in office buildings were similar to those of the commercial buildings sector as a whole (Table 8 and Figure 5). Furnaces were most used followed by packaged heating systems. Individual space heaters were third-most used but were primarily used to supplement the building's main heating system. Boilers and district heat systems were more often used in larger buildings. Table 8. Types of Heating Equipment Used in Office Buildings, 2003 Number of Buildings (thousand) Total Floorspace (million square feet) All Buildings* All Office Buildings All Buildings* All Office Buildings All Buildings 4,645 824 64,783 12,208 All Buildings with Space Heating 3,982 802 60,028 11,929 Heating Equipment (more than one may apply)

229

CVD Equipment Corp | Open Energy Information  

Open Energy Info (EERE)

CVD Equipment Corp CVD Equipment Corp Jump to: navigation, search Name CVD Equipment Corp Place Ronkonkoma, New York Zip 11779 Sector Solar Product New York-based maker of chemical vapour deposition process equipment. This equipment is used in the manufacture of solar and semiconductor fabrication. Coordinates 40.81122°, -73.098744° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.81122,"lon":-73.098744,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

230

Definition: Disturbance Monitoring Equipment | Open Energy Information  

Open Energy Info (EERE)

Disturbance Monitoring Equipment Disturbance Monitoring Equipment Jump to: navigation, search Dictionary.png Disturbance Monitoring Equipment Devices capable of monitoring and recording system data pertaining to a Disturbance. Such devices include the following categories of recorders: Sequence of event recorders which record equipment response to the event., Fault recorders, which record actual waveform data replicating the system primary voltages and currents. This may include protective relays., Dynamic Disturbance Recorders (DDRs), which record incidents that portray power system behavior during dynamic events such as low-frequency (0.1 Hz - 3 Hz) oscillations and abnormal frequency or voltage excursions. Phasor Measurement Units and any other equipment that meets the functional requirements of DMEs may qualify as DMEs.[1]

231

Laboratory Equipment Donation Program - About Us  

Office of Scientific and Technical Information (OSTI)

About LEDP About LEDP The Laboratory Equipment Donation Program (LEDP), formerly the Energy-Related Laboratory Equipment (ERLE) Grant Program, was established by the United States Department of Energy (DOE) to grant surplus and available used energy-related laboratory equipment to universities and colleges in the United States for use in energy oriented educational programs. This grant program is sponsored by the Office of Workforce Development for Teachers and Scientists (WDTS). The listing of equipment available through LEDP is updated as new equipment is identified. It is available at no cost for a limited time and is granted on a first-received qualified application basis. Specific items may be recalled for DOE use and become unavailable through the program after the

232

Experimental Equipment | Stanford Synchrotron Radiation Lightsource  

NLE Websites -- All DOE Office Websites (Extended Search)

Equipment Equipment SSRL plans the distribution of its limited equipment on the basis of the information supplied on the Beam Time Request Form and the User Support Requirements Form. Please make sure to state all of your needs. Standard X-Ray Station Equipment Standard equipment to be found on an x-ray station includes: (1 ea.) Small and large ionization chambers (1) Exit slits (1) X-Y sample positioner (3) Keithly 427 current-to-voltage amplifier TEK 2215 60 MHZ 2 channel scope Voltage-to-frequency converter (3 channels) (1) Fluke high voltage power supply (1) Kinetic Systems hex scaler (1) Kinetic Systems up-down presettable counter (1) Ortec real-time clock (2) Joerger stepping motor controller DSP Micro VAX or Kinetic Systems G.I./CAMAC crate controller (1) Standard Engineering Corporation CAMAC power supply

233

Automatic monitoring of vibration welding equipment  

DOE Patents (OSTI)

A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

2014-10-14T23:59:59.000Z

234

Universal null DTE (data terminal equipment)  

DOE Patents (OSTI)

A communication device in the form of data terminal equipment permits two data communication equipments, each having its own master clock and operating at substantially the same nominal clock rate, to communicate with each other in a multi-segment circuit configuration of a general communication network even when phase or frequency errors exist between the two clocks. Data transmitted between communication equipments of two segments of the communication network is buffered. A variable buffer fill circuit is provided to fill the buffer to a selectable extent prior to initiation of data output clocking. Selection switches are provided to select the degree of buffer preload. A dynamic buffer fill circuit may be incorporated for automatically selecting the buffer fill level as a function of the difference in clock frequencies of the two equipments. Controllable alarm circuitry is provided for selectively generating an underflow or an overflow alarm to one or both of the communicating equipments. 5 figs.

George, M.; Pierson, L.G.; Wilkins, M.E.

1987-11-09T23:59:59.000Z

235

Definition: Equipment Condition Monitor | Open Energy Information  

Open Energy Info (EERE)

Condition Monitor Condition Monitor Jump to: navigation, search Dictionary.png Equipment Condition Monitor A monitoring device that automatically measures and communicates equipment characteristics that are related to the "health" and maintenance of the equipment. These characteristics can include, but are not limited to temperature, dissolved gas, and loading. These devices can automatically generate alarm signals if conditions exceed preset thresholds.[1] Related Terms sustainability References ↑ https://www.smartgrid.gov/category/technology/equipment_condition_monitor [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitions|Template:BASEPAGENAME]] Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Condition_Monitor&oldid=502601"

236

Project Year Project Team  

E-Print Network (OSTI)

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

237

Microsoft PowerPoint - FinalModule2.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Work Breakdown Structure 2: Work Breakdown Structure Prepared by: Module 2 - Work Breakdown Structure 1 Prepared by: Booz Allen Hamilton Module 2: Work Breakdown Structure Welcome to Module 2. The objective of this module is to introduce you to Work Breakdown Structure (WBS) and other supporting documents. This module will include defining and illustrating the following topics: * Work Breakdown Structure * WBS dictionary * Organizational Breakdown Structure (OBS) * Responsibility Assignment Matrix (RAM) Module 2 - Work Breakdown Structure 2 Prepared by: Booz Allen Hamilton What is a Work Breakdown Structure? Planning a project using earned value management is no different than the initial planning necessary to implement any given project. There are basic items that you need to know and understand as a project manager:

238

If laboratory safety were com-pared to a research project, the  

E-Print Network (OSTI)

If laboratory safety were com- pared to a research project, the "materials" would consist procedures and equipment operation manuals, protective clothing, fume hoods, biosafety cabinets and eye equipment, failing to follow safety procedures or inadequate emergency response actions. These incident

Liebling, Michael

239

Custom Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Commercial Commercial Industrial Lighting Energy Smart Grocer Program HVAC Program Shell Measures Commercial Kitchen & Food Service Equipment Plug Load New...

240

Appliances and Commercial Equipment Standards: Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office HOME ABOUT ENERGY EFFICIENT TECHNOLOGIES RESIDENTIAL BUILDINGS COMMERCIAL BUILDINGS APPLIANCE & EQUIPMENT STANDARDS BUILDING ENERGY CODES EERE » Building Technologies Office » Appliances & Equipment Standards About Standards & Test Procedures Implementation, Certification & Enforcement Rulemakings & Notices Further Guidance ENERGY STAR® Guidance and Frequently Asked Questions This webpage is designed to provide guidance and answer Frequently Asked Questions (FAQs) on the U.S. Department of Energy's appliance standards program. Guidance types span all covered products and covered equipment and cover such topics as: definitions, scope of coverage, conservation standards, test procedures, certification, Compliance and Certification Management System (CCMS), and enforcement. This website offers users an

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Long Length Contaminated Equipment Maintenance Plan  

SciTech Connect

The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation.

ESVELT, C.A.

2000-02-01T23:59:59.000Z

242

Incidents of chemical reactions in cell equipment  

SciTech Connect

Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

1991-12-31T23:59:59.000Z

243

NAFTA opportunities: Electrical equipment and power generation  

SciTech Connect

The North American Free Trade Agreement (NAFTA) provides significant commercial opportunities in Mexico and Canada for the United States electric equipment and power generation industries, through increased goods and services exports to the Federal Electricity Commission (CFE) and through new U.S. investment in electricity generation facilities in Mexico. Canada and Mexico are the United States' two largest export markets for electrical equipment with exports of $1.53 billion and $1.51 billion, respectively, in 1992. Canadian and Mexican markets represent approximately 47 percent of total U.S. exports of electric equipment. The report presents an economic analysis of the section.

Not Available

1993-01-01T23:59:59.000Z

244

Status of the space-cooling-equipment market in the commercial sector. Topical report, November 1985-March 1986  

SciTech Connect

The report covers the cooling equipment market for commercial applications as characterized by a data base on shipments (with adjustment for U.S. exports and foreign imports), highlighting activities in the absorption chiller market, and predicting scenarios for future equipment shipments. An analysis of unitary air-conditioning equipment and commercial liquid chillers was performed to determine the population of domesticaly shipped equipment by type and capacity. A review of absorption liquid chiller marketing was performed to identify marketing techniques used to enhance absorption liquid chiller sales and to determine decision-making criteria used to evaluate replacement of existing equipment with absorption liquid chillers. Finally, cooling-market projections were made to forecast the future sales trends of commercial air-conditioning equipment.

Harris, L.; Katsenelenbogen, S.; Bernstein, H.; Bluestein, J.

1986-04-01T23:59:59.000Z

245

Project Fact Sheet Project Brief  

E-Print Network (OSTI)

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £1.1M Funding Source: Departmental Construction Project Programme: Start on Site: November 2010 End Date : March 2011 Occupation Date: March 2011 For further information contact Project Manager as listed above

246

Project Fact Sheet Project Update  

E-Print Network (OSTI)

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5 operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20.imperial.ac.uk/biomedeng Construction Project Team: Project Facts & Figures: Budget: £13,095,963 Funding Source: SRIF II and Capital

247

Project Fact Sheet Project Brief  

E-Print Network (OSTI)

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

248

Definition: Equipment Rating | Open Energy Information  

Open Energy Info (EERE)

Rating Rating Jump to: navigation, search Dictionary.png Equipment Rating The maximum and minimum voltage, current, frequency, real and reactive power flows on individual equipment under steady state, short-circuit and transient conditions, as permitted or assigned by the equipment owner.[1] Also Known As Standard current ratings Related Terms reactive power, smart grid References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Rating&oldid=502535" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

249

Piedmont Natural Gas - Residential Equipment Efficiency Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Piedmont Natural Gas - Residential Equipment Efficiency Program Piedmont Natural Gas - Residential Equipment Efficiency Program Piedmont Natural Gas - Residential Equipment Efficiency Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Appliances & Electronics Water Heating Maximum Rebate 2 rebates per household Program Info State North Carolina Program Type Utility Rebate Program Rebate Amount High-Efficiency Furnace: $175 Tankless Water Heater: $150 Tank Water Heater: $50 Provider Gas Technology and Energy Services Piedmont Natural Gas offers rebates on high-efficiency natural gas tankless water heaters, tank water heaters and furnaces. Customers on the 101-Residential Service rate are eligible for these rebates. Rebates are only provided for qualifying natural gas equipment that is installed to

250

Laboratory Equipment Donation Program - Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy U.S. Department of Energy Laboratory Equipment Donation Program Home About LEDP FAQ Application Site Index Contact Us Administrative Login SEARCH: Go! view equipment list LEDP News Latest Equipment Added as of January 08, 2014: 1. DATA HANDLING SYSTEM 89514133530195 2. METER, VOLT 89514133530179 3. RECORDER, STRIP 89514133530184 4. RECORDER, STRIP 89514133530185 5. SCINTILLATOR STRIPS, 1.9 CM X 1.5 CM X 96 CM 89514133530188 Quick Links What type of equipment is available? Who is eligible to apply? How long will it take to find out if my application has been approved? Who is responsible for arranging and paying for shipping? RSS Get Widgets Bookmark and Share Get the tools you need to inspire innovation and creativity The United States Department of Energy (DOE), in accordance with its

251

Energy Sub-Metering Equipment and Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Sub-Metering Equipment and Applications Energy Sub-Metering Equipment and Applications Speaker(s): Sim Gurewitz Date: July 24, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Paul Mathew This talk will address the following topics:Submetering basics: What is it? How does a submeter work?How to obtain a finer level of energy information within the buildingApplications: Who submeters and why?LEED NC/EB/CS and submetering / Energy & Atmosphere pointsSubmetering equipment: gas, electric, water, steam, CW Btu and HHW BtuHow to install equipment without scheduling an outageLoad Control option for automated load shedding and peak shavingWireless submeters and communication options / integration to EMS-BMCSAutomatic remote meter reading and cost allocation softwarePutting it all together into a metering SYSTEM: read from anywhere, IP

252

Industrial Equipment Demand and Duty Factors  

E-Print Network (OSTI)

Demand and duty factors have been measured for selected equipment (air compressors, electric furnaces, injection molding machines, centrifugal loads, and others) in industrial plants. Demand factors for heavily loaded air compressors were near 100...

Dooley, E. S.; Heffington, W. M.

253

BCM 2 Equipment Inventory | Sample Preparation Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

& Material Science Laboratory 2 Title Equipment Type Description Accumet Basic AB15 pH meter pH Meter pH meters with combination AgAgCl electrode and ATC probe. Corning 430 pH...

254

UNIVERSITY OF WASHINGTON ANNUAL EQUIPMENT TESTING AND  

E-Print Network (OSTI)

UNIVERSITY OF WASHINGTON ANNUAL EQUIPMENT TESTING AND MAINTENANCE SUMMARY DIVING SAFETY PROGRAM Date Tested Condition when received Intermediate Pressure Inhalation Resistance Exhalation Resistance Tested Make Serial Number Date Tested Results DEPTH GAUGE BUOYANCY COMPENSATOR Make Serial Number Date

Wilcock, William

255

Safety Topic: Rota/ng Equipment  

E-Print Network (OSTI)

Safety Topic: Rota/ng Equipment Jus/n Kleingartner #12;Safety protocols 2 #12;Safety protocols for opera/ng a lathe · Don'ts: ­ Do not wear gloves

Cohen, Robert E.

256

An Approach to Evaluating Equipment Efficiency Policies  

E-Print Network (OSTI)

AN APPROACH TO EVALUATING EQUIPMENT EFFICIENCY POLICIES Donald E. Newsom, Ph.D. and Allan R. Evans, Ph.D., P.E. Argonne National Laboratory, Argonne, Illinois ABSTRACT The National Energy Conservation Policy Act of 1978 authorized studies...

Newsom, D. E.; Evans, A. R.

1980-01-01T23:59:59.000Z

257

Cruising Equipment Company CECO | Open Energy Information  

Open Energy Info (EERE)

Cruising Equipment Company CECO Cruising Equipment Company CECO Jump to: navigation, search Name Cruising Equipment Company (CECO) Place Seattle, Washington Zip 98107 Product Maker of pollution control equipment - bought by Xantrex in 2000. Coordinates 47.60356°, -122.329439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.60356,"lon":-122.329439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

258

Computer optimization of earthmoving equipment arrays  

E-Print Network (OSTI)

higher degree of equipment specialization. Thus, the con- tractor attempts now to insure that individual segments of jobs are performed by the most economical means available to him. The choice of equipment to be used is difficult indeed... drawn carts. Next came use of the drag scraper followed by a wheel-mounted scraper which could dig, transport and dump its load. A major contribution to the earthmoving industry was the track-type tractor, which was developed in 1904. The potential...

Pate, Jep Earl

2012-06-07T23:59:59.000Z

259

Better Buildings Alliance Equipment Performance Specifications  

Energy.gov (U.S. Department of Energy (DOE))

Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

260

List of Agricultural Equipment Incentives | Open Energy Information  

Open Energy Info (EERE)

Agricultural Equipment Incentives Agricultural Equipment Incentives Jump to: navigation, search The following contains the list of 90 Agricultural Equipment Incentives. CSV (rows 1 - 90) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Agricultural Energy Efficiency Program (New York) State Rebate Program New York Agricultural Agricultural Equipment Boilers Chillers Custom/Others pending approval Dishwasher Furnaces Heat pumps Heat recovery Lighting Lighting Controls/Sensors Motor VFDs Motors Water Heaters Commercial Cooking Equipment Commercial Refrigeration Equipment Food Service Equipment Yes Agricultural Lighting and Equipment Rebate Program (Vermont) State Rebate Program Vermont Agricultural Agricultural Equipment Custom/Others pending approval Lighting

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Facility Construction - Mechanical Equipment - June Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 June 26, 2012 Nuclear Facility Construction - Mechanical Equipment Installation, (HSS CRAD 45-53, Rev. 0) The purpose of this criteria review and approach, this CRAD includes mechanical equipment installation, including connections of the equipment to installed piping systems, and attachments of the equipment to structures (concrete, structural steel, or embed plates). Mechanical equipment includes items such as pumps and motors, valves, tanks, glove boxes, heat exchangers, ion exchangers, service air system, fire pumps and tanks, and heating, ventilation, and air condition (HVAC) equipment such as fans, scrubbers and filters.

262

Alternative Fuels Data Center: Pollution Control Equipment Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Pollution Control Pollution Control Equipment Exemption to someone by E-mail Share Alternative Fuels Data Center: Pollution Control Equipment Exemption on Facebook Tweet about Alternative Fuels Data Center: Pollution Control Equipment Exemption on Twitter Bookmark Alternative Fuels Data Center: Pollution Control Equipment Exemption on Google Bookmark Alternative Fuels Data Center: Pollution Control Equipment Exemption on Delicious Rank Alternative Fuels Data Center: Pollution Control Equipment Exemption on Digg Find More places to share Alternative Fuels Data Center: Pollution Control Equipment Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Pollution Control Equipment Exemption Dedicated original equipment manufacturer natural gas vehicles and

263

Project Year Project Team  

E-Print Network (OSTI)

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

264

Project Year Project Team  

E-Print Network (OSTI)

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

265

Project Management Project Managment  

E-Print Network (OSTI)

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

266

Standard Review Plan (SRP) Modules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance » Standard Quality Assurance » Standard Review Plan (SRP) Modules Standard Review Plan (SRP) Modules Standard Review Plan - Critical Decision Handbook Overview Project Management Project Execution Plan Review Module (RM) Risk Management RM Integrated Project Team RM Earned Value Management System RM Acquisition Strategy RM Decommissioning Plan RM Site Transition Guidance Engineering and Design Conceptual Design RM Preliminary Design RM Final Design RM Construction Readiness RM Checkout, Testing, and Commissioning Plan RM Readiness Review RM Seismic Design Expectations Report Technology Readiness Assessment Report External Technical Review Report Preparation for Facility Operations RM Safety Safety Design Strategy RM Conceptual Safety Design RM Preliminary Safety Design RM Facility Disposition Safety Strategy RM

267

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

, and project oversight. Integrated Combined Heat and Power Systems Corporation, Gearoid Foley for the Combined Heat and Power project (Contr INTEGRATED COOLING, HEATING AND ENGINE POWER MODULE FEBRUARY 2010 CEC5002009098 Prepared for: California

268

HEALTH AND SAFETY PROCEDURES -Major Projects  

E-Print Network (OSTI)

HEALTH AND SAFETY PROCEDURES - Major Projects HEALTH & SAFETY UNIT SPRING 2006 #12;CONTENTS of this document is to provide the University with a summary of the principle activities in construction projects the reliance on physical controls and use of personnel protective equipment. The procedures that consider

269

Microsoft Word - Esquatzel_Project_2011.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Hall James Hall Project Manager - TPC-TPP-4 Proposed Action: Esquatzel Project Budget Information: WO# 257267, Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Green Energy Today's small generator interconnection request, BPA is planning to integrate their 1.1-MW Esquatzel Hydro Generation Project into its balancing authority (BA). The proposed point of interconnection is at Pole 66 G 1229 on the Bureau of Reclamation's

270

Electricity Used by Office Equipment and Network Equipment in the U.S.: Detailed Report and Appendices  

E-Print Network (OSTI)

LBNL-45917 Electricity Used by Office Equipment and Network Equipment in the U.S.: Detailed Report..............................................................................................46 #12;#12;1 Electricity Used by Office Equipment and Network Equipment in the U.S. Kaoru Kawamoto and network equipment, there has been no recent study that estimates in detail how much electricity

271

Project Accounts  

NLE Websites -- All DOE Office Websites (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

272

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reclamation of Pits and Boxes Reclamation of Pits and Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description [include anything that Reclamation of Q!!]y the following Pits and Boxes : 1. T-2-11 could impact the environment) 2. B-1-10 Pit 2. Legal location 3. B-1-3 Pit 3. Duration of the project 4. T .Q-3 Concrete Sump Box 4. Major equipment to be used 5. B-2-10 Skim Box 6. B-1-14 Skim Box 7. 66-1-StX-14 Pit 8. T-5-10 Pit 9. WDFSkim Box 10. WDFUpperPit 11 . WDFLowerPit 12. B-1-3 Skim Box 13. T-3-3 Skim Box 14. T-1-20 Pit 15. T-2-34 Pit (A) 16. T-2-34 Pit (B) 17. B-1 -10 Skim Box 18. Carwash Skim Box 19. 5~1-SX-3-Madison Water Valve Box from 57-WX-3 20. T-5-3 Pit

273

NERSC Modules Software Environment  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment » Modules Environment Environment » Modules Environment Modules Software Environment NERSC uses the module utility to manage nearly all software. There are two huge advantages of the module approach: NERSC can provide many different versions and/or installations of a single software package on a given machine, including a default version as well as several older and newer versions; and Users can easily switch to different versions or installations without having to explicitly specify different paths. With modules, the MANPATH and related environment variables are automatically managed. Users simply ``load'' and ``unload'' modules to control their environment. The module utility consists of two parts: the module command itself and the modulefiles on which it operates. Module Command

274

Construction Project Safety and Health Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Project Safety and Construction Project Safety and Health Plan Review Module March 2010 CD-0 Co 0 Le OFFICE O onstructi CD-1 This Review ssons learned f OF ENVIRO Standard ion Proje Rev Critical D CD-2 M w Module has b from the pilot h ONMENTA Review Pla ect Safety view Modul Decision (CD CD March 2010 been piloted at have been inco AL MANAG an (SRP) y and He le D) Applicabili D-3 the INL IWTU orporated in Re GEMENT alth Plan ity CD-4 U Project. eview Module. n Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

275

1982 analyses and reports: equipment availability report; component cause code report; and equipment availability report  

SciTech Connect

This equipment availability report (1973 to 1982, 1982) presents statistical information on the performance of the major types of generating units and their major component groups. (DLC)

Not Available

1982-01-01T23:59:59.000Z

276

Project Fact Sheet Project Update  

E-Print Network (OSTI)

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

277

Project Fact Sheet Project Brief  

E-Print Network (OSTI)

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

278

Modulational effects in accelerators  

SciTech Connect

We discuss effects of field modulations in accelerators, specifically those that can be used for operational beam diagnostics and beam halo control. In transverse beam dynamics, combined effects of nonlinear resonances and tune modulations influence diffusion rates with applied tune modulation has been demonstrated. In the longitudinal domain, applied RF phase and voltage modulations provide mechanisms for parasitic halo transport, useful in slow crystal extraction. Experimental experiences with transverse tune and RF modulations are also discussed.

Satogata, T.

1997-12-01T23:59:59.000Z

279

Volume Project  

E-Print Network (OSTI)

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

280

Microsoft Word - APRIL 2009 PMCDP Module CHRIS ESS Tutorial_ESTABLISHI...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Click on the tab marked "PMCDP" for a listing of available options in the module. ESS Tutorial, Project Management Career Development Program SET PMCDP PROFILE REV: APRIL...

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Production Ethanol Production Equipment Tax Exemption to someone by E-mail Share Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Facebook Tweet about Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Twitter Bookmark Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Google Bookmark Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Delicious Rank Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on Digg Find More places to share Alternative Fuels Data Center: Ethanol Production Equipment Tax Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Production Equipment Tax Exemption

282

Microsoft Word - CX_McNaryEquipmentAcquisition.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to purchase equipment owned by Umatilla Electric Cooperative (UEC) within BPA's McNary Substation. BPA already maintains all of UEC's equipment in the substation under an...

283

Dispensing Equipment Testing With Mid-Level Ethanol/Gasoline...  

Energy Savers (EERE)

Dispensing Equipment Testing With Mid-Level EthanolGasoline Test Fluid Dispensing Equipment Testing With Mid-Level EthanolGasoline Test Fluid The National Renewable Energy...

284

Four-port gas separation membrane module assembly  

DOE Patents (OSTI)

A gas-separation membrane assembly, and a gas-separation process using the assembly. The assembly incorporates multiple gas-separation membranes in an array within a single vessel or housing, and is equipped with two permeate ports, enabling permeate gas to be withdrawn from both ends of the membrane module permeate pipes.

Wynn, Nicholas P. (Redwood City, CA); Fulton, Donald A. (Fairfield, CA); Lokhandwala, Kaaeid A. (Fremont, CA); Kaschemekat, Jurgen (Campbell, CA)

2010-07-20T23:59:59.000Z

285

IE 361 Module 14 Patterns on Control Charts and "Special  

E-Print Network (OSTI)

. Vardeman and Max D. Morris Reading: Section 3.4, Statistical Quality Assurance Methods for Engineers 1 #12IE 361 Module 14 Patterns on Control Charts and "Special Checks"/Extra Alarm Rules Prof.s Stephen B introduction of new equipment or a clear change in the quality of a raw material can produce such a sudden

Vardeman, Stephen B.

286

Industrial Carbon Capture Project Selections  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Partner Organizations) Funding Lead Organization Location (City, State) Project Title - Project Description 1) Large Scale Testing of Advanced Gasification Technologies Air Products & Chemicals, Inc. $71,700,000 Allentown, PA Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems Air Products will accelerate commercial manufacture of ion transport membranes modules and initiate the development a 2,000 TPD pre- commercial scale facility ahead of schedule, enabling this technology

287

NSLS Services | Repair & Equipment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Repair & Equipment Services Repair & Equipment Services Cleaning Facility (BNL Central Shops) Solvent cleaning of vacuum parts and leak checking service is also available. Work is billed to each user via a BNL ILR. Contact the NSLS Building Manager to arrange for any of these services. Electronics Repair Limited repairs for electronic equipment are available from an outside contractor through the Control Room. Contact Control Room Supervisor Randy Church (x2550 or x2736, pager 5310). Shipping memos are filled out on the web, and pick ups are on Fridays. Come to the Control Room for assistance. The user should call the contractor on the day before scheduled pickups to alert the contractor of the pickup. Items to be repaired should be left in the Control Room with the completed shipping memo. Costs are charged to the

288

Anechoic Chamber o Echoless Room, existing equipment  

E-Print Network (OSTI)

with a bar that doesn't allow the blocks to fall off will simulate gravity Alternative Energy o Solar #12;o Wind o Road that creates power as you drive over it Voice Modulator Sumo Bots Hybrid Cars #12;

Saskatchewan, University of

289

Dispensing Equipment Testing With Mid-Level Ethanol/Gasoline Test Fluid  

Energy.gov (U.S. Department of Energy (DOE))

The National Renewable Energy Laboratorys (NREL) Nonpetroleum-Based Fuel Task addresses the hurdles to commercialization of biomass-derived fuels and fuel blends. One such hurdle is the unknown compatibility of new fuels with current infrastructure, such as the equipment used at service stations to dispense fuel into automobiles. The U.S. Department of Energys (DOE) Vehicle Technology Program and the Biomass Program have engaged in a joint project to evaluate the potential for blending ethanol into gasoline at levels higher than nominal 10 volume percent. The U.S. Environmental Protection Agency (EPA) is considering a waiver application for 15% by volume ethanol blended into gasoline (E15). Should the waiver be granted, service stations may be able to use their current equipment to dispense the new fuel. This project was established to help DOE and NREL better understand any potentially adverse impacts caused by a lack of knowledge about the compatibility of the dispensing equipment with ethanol blends higher than what the equipment was designed to dispense. This report provides data about the impact of introducing a gasoline with a higher volumetric ethanol content into service station dispensing equipment from a safety and a performance perspective.

290

Comparing Efficiency Projections (released in AEO2010)  

Reports and Publications (EIA)

Realized improvements in energy efficiency generally rely on a combination of technology and economics. The figure below illustrates the role of technology assumptions in the Annual Energy Outlook 2010 projections for energy efficiency in the residential and commercial buildings sector. Projected energy consumption in the Reference case is compared with projections in the Best Available Technology, High Technology, and 2009 Technology cases and an estimate based on an assumption of no change in efficiency for building shells and equipment.

2010-01-01T23:59:59.000Z

291

dieSel/heAvy equipMent College of Rural and Community Development  

E-Print Network (OSTI)

and equipment overhauls. Students work on large truck fuel, electrical and air systems, diesel engines 907-455-2809 www.ctc.uaf.edu/programs/diesel/ certificate Minimum Requirements for Certificate: 36 credits The diesel and heavy equipment mechanics program offers the student training in the maintenance

Hartman, Chris

292

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

293

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

294

NEPA COMPLIANCE SURVEY Project Information Project Title: Express Stack Tools  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Express Stack Tools Express Stack Tools Date: 11/16/2010 DOE Code: 6730.020.81023 Contractor Code: 8067-971 Project Lead: Brian Black Project Overview 1) This project will test open and cased Hole logging tools in multiple wells. The tools to be testied include: 1. Brief project description [include anything that could impact the natural gamma, borehole temperature, compensated neutron, compensated density with PE, dual environment] induction/short guard, neutron prompt gamma, and acoustic televiewer tool. Radioactive sources will be run in the well as part of the toolstring. 2. Legal location 3. Duration of the project 2) 48-X-28 well location, SE %, SW %, Tsp 39N Rng 78W, Section 28; 45::3-X-21 well location, NE %, SW 4. Major equipment to be used %, Tsp 39N, Rng 78W, Section 21; 46-TpX-10 well location, NE %, SW Y.., Tsp38N, Rng 78W, Section 10.

295

Conceptual design report, CEBAF basic experimental equipment  

SciTech Connect

The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

NONE

1990-04-13T23:59:59.000Z

296

Project Controls  

Directives, Delegations, and Requirements

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

297

California Hydrogen Infrastructure Project  

SciTech Connect

Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a ???¢????????real-world???¢??????? retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation???¢????????s hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products???¢???????? Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user???¢????????s fueling experience.

Edward C. Heydorn

2013-03-12T23:59:59.000Z

298

The Mississippi CCS Project  

SciTech Connect

The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

Doug Cathro

2010-09-30T23:59:59.000Z

299

On the flat length of injective modules  

Science Journals Connector (OSTI)

......that I has a projective resolution of length n + m and hence pdRI n + m. Therefore, spli R n + m, as needed. The second inequality...n - 1. Proof. Let I be an injective left R-module. Then pdRI spli R n and hence Corol- lary 2.12 implies that fdRI n......

Ioannis Emmanouil; Olympia Talelli

2011-10-01T23:59:59.000Z

300

3M's Motor Challenge Showcase Demonstration Project  

E-Print Network (OSTI)

. Cost control procedures are put into place and the team begins creating the specifications and drawings needed to physically complete the projects. Procurement of equipment, selection of craft labor, downtime coordination and field follow-up is all... to Management for Funding Approval Follow-up Obtain Authority For Expenditure vn Implementation Cost Control Procedures Engineer Specifications, Design Schedule Downtime Procure Equipment Select Contractor Field Follow-up vm Follow-up Measure...

Schultz, S. C.

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

module 4 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

module 4 module 4 HR5 TRANSITION BRIEFING module 4 More Documents & Publications Microsoft Word - Rev5functionalaccountabilityimplementationplan..doc Management (WFP) DEPARTMENT OF...

302

Asset Management Equipment Disposal Form -Refrigerant Recovery  

E-Print Network (OSTI)

enters the waste stream with the charge intact (e.g., motor vehicle air conditioners, refrigeratorsAsset Management Equipment Disposal Form - Refrigerant Recovery Safe Disposal Requirements Under refrigeration, cold storage warehouse refrigeration, chillers, and industrial process refrigeration) has to have

Sin, Peter

303

WAMPANOAG WELLNESS EQUIPMENT LENDING BANK POLICIES & PROCEDURES  

E-Print Network (OSTI)

vacuums and steam cleaners, can be used to address immediate concerns, such as intense cleaning to remove to enable the Health Service to measure the environmental impact of the use of the equipment in the homes moisture levels or improve air quality. STEP TWO: RECOMMENDATIONS As noted, recommendations in the Home

304

Research equipment: Surface Acoustic Wave (SAW) devices  

E-Print Network (OSTI)

of the acoustic wave. More specifically, the equipment consists of: i. HP 4195A (10Hz-500MHz) ii. HP 8753ES (30kHz measurements on many SAW devices iii. Agilent E5061A (300kHz-1.5GHz) http Scientific Corp.): Atmospheric plasma etching, for surface cleaning, surface treatment and activation

Gizeli, Electra

305

Research equipment: Surface Acoustic Wave (SAW) devices  

E-Print Network (OSTI)

, the equipment consists of: i. HP 4195A (10Hz-500MHz) ii. HP 8753ES (30kHz-3GHz) with time-gating option. Agilent E5061A (300kHz-1.5GHz) Switch control Network Analyzer Quartz Crystal Microbalance-coating of various polymeric films. Expanded Plasma Cleaner & PlasmaFloTM (Harrick Scientific Corp.): Atmospheric

Gizeli, Electra

306

Processing Equipment 2" Davis-Standard Extruder  

E-Print Network (OSTI)

Processing Equipment 2" Davis-Standard Extruder Improved Melting Grooved Feeding Capabilities Multiple Pressure Ports Along the Barrel Screw Cooling Kit Rod Die With Valved Adapter Higher Throughputs L Ring 1'' General Purpose Screw 3 Air-Cooled Barrel Zones Gala Industries Underwater Micropelletizer

Bone, Gary

307

Standardized equipment labeling program for electrical utilities  

SciTech Connect

The purpose of this supporting document is to provide specific guidelines required for Electrical Utilities to implement and maintain a standard equipment and piping labeling program in accordance with WHC-SP-0708, Chapter 18, {open_quotes}Westinghouse Hanford Company Conduct of Operations Manual{close_quotes}. Specific guidelines include definition of program responsibilities.

Not Available

1994-07-19T23:59:59.000Z

308

Original article Enzymatic equipment of Ascosphaera apis  

E-Print Network (OSTI)

Original article Enzymatic equipment of Ascosphaera apis and the development of infection The process of infection of honey bee brood by the fungus Ascosphaera apis was ini- tiated the fungus pierces the cuticle. Ascosphaera apis / Apis mellifera / larval cuticle / penetration / infection

Paris-Sud XI, Université de

309

Standard hydrogen monitoring system equipment installation instructions  

SciTech Connect

This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

Schneider, T.C.

1996-09-27T23:59:59.000Z

310

Microsoft PowerPoint - FinalModule1.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Introduction to Earned Value 1: Introduction to Earned Value Management Prepared by: Module 1 - Introduction 1 Prepared by: Booz Allen Hamilton Module1: Introduction to Earned Value Welcome to Module 1. The objective of this module is to introduce you to Earned Value and lay the blueprint for the succeeding modules. This module will include the following topics: * Earned Value Management defined * The differences between Traditional Management and Earned Value Management * How Earned Value Management fits into a Program and Project environment * The framework necessary for proper Earned Value implementation Module 1 - Introduction 2 Prepared by: Booz Allen Hamilton What is Earned Value Management? Earned Value Management (EVM) is a systematic approach to the integration and measurement of cost, schedule, and technical (scope) accomplishments

311

Unidata Community Equipment Awards Cover Sheet Proposal Title  

E-Print Network (OSTI)

RAID array with 4 TB storage · Support equipment including a rack, rack console, uninterruptable power

312

STATE OF CALIFORNIA VERIFICATION OF HIGH EER EQUIPMENT  

E-Print Network (OSTI)

STATE OF CALIFORNIA VERIFICATION OF HIGH EER EQUIPMENT CEC-CF-4R-MECH-23 (Revised 08/09) CALIFORNIA of High EER Equipment (Page 1 of 2) Site Address: Enforcement Agency: Permit Number: Registration Number 2009 Verification of High EER Equipment Procedures for verification of High EER Equipment are described

313

STATE OF CALIFORNIA VERIFICATION OF HIGH EER EQUIPMENT  

E-Print Network (OSTI)

STATE OF CALIFORNIA VERIFICATION OF HIGH EER EQUIPMENT CEC-CF-6R-MECH-23-HERS (Revised 08/09) CALIFORNIA ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-23-HERS Verification of High EER Equipment 2009 Verification of High EER Equipment Procedures for verification of High EER Equipment are described

314

New designs in reconstructing the mechanical equipment of hydroelectric stations  

Science Journals Connector (OSTI)

1. Reliable operation of mechanical equipment can be assured, provided timely conduction of repairs and reconstr...

S. V. Leeson

1996-03-01T23:59:59.000Z

315

Page 1 of 3 Policy: Fire Protection Equipment Policy  

E-Print Network (OSTI)

Page 1 of 3 Policy: Fire Protection Equipment Policy Responsible Party: Director, Safety and Risk The Office of Safety and Risk Management (SRM) has developed, and implemented the Fire Protection Equipment of Fire Protection Equipment throughout MSU to maintain its working order. Fire Protection Equipment

Dyer, Bill

316

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network (OSTI)

upgrading electrical equipment to energy efficient models, including conductor sizing, overcurrent protective devices, grounding, and harmonics. The pages that follow provide guidance in the decision-making process when replacing electrical equipment... equipment. Several areas of compatibility must be addressed for equipment to work properly. Critical areas of concern are conductor sizing, overcurrent protection devices, grounding, and harmonics. Conductor Sizing Conductors are sized...

Massey, G. W.

2005-01-01T23:59:59.000Z

317

Advanced silicon photonic modulators  

E-Print Network (OSTI)

Various electrical and optical schemes used in Mach-Zehnder (MZ) silicon plasma dispersion effect modulators are explored. A rib waveguide reverse biased silicon diode modulator is designed, tested and found to operate at ...

Sorace, Cheryl M

2010-01-01T23:59:59.000Z

318

Building Technologies Office: About the Appliance and Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Appliance and About the Appliance and Equipment Standards Program to someone by E-mail Share Building Technologies Office: About the Appliance and Equipment Standards Program on Facebook Tweet about Building Technologies Office: About the Appliance and Equipment Standards Program on Twitter Bookmark Building Technologies Office: About the Appliance and Equipment Standards Program on Google Bookmark Building Technologies Office: About the Appliance and Equipment Standards Program on Delicious Rank Building Technologies Office: About the Appliance and Equipment Standards Program on Digg Find More places to share Building Technologies Office: About the Appliance and Equipment Standards Program on AddThis.com... About History & Impacts Statutory Authorities & Rules Regulatory Processes

319

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Regulation Exemption to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Regulation Exemption on AddThis.com...

320

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Requirements to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on AddThis.com... More in this section... Federal State Advanced Search

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Installation Requirements to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Installation Requirements on AddThis.com...

322

Training program requirements for remote equipment operators in nuclear facilities  

SciTech Connect

One of the most neglected areas in the engineering development of remotely operated equipment applications in nuclear environments is the planning of adequate training programs for the equipment operators. Remote equipment accidents cannot be prevented solely by engineered safety features on the equipment. As a result of the experiences in using remote equipment in the recovery effort at Three Mile Island Unit 2 (TMI-2), guidelines for the development of remote equipment operator training programs have been generated. The result is that a successful education and training program can create an environment favorable to the safe and effective implementation of a remote equipment program in a nuclear facility.

Palau, G.L.; Auclair, K.D.

1986-01-01T23:59:59.000Z

323

Alternative Fuels Data Center: Biodiesel Production and Blending Equipment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Production Biodiesel Production and Blending Equipment Tax Credit to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Google Bookmark Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Delicious Rank Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Production and Blending Equipment Tax Credit on AddThis.com... More in this section... Federal State

324

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Requirements to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Requirements on AddThis.com... More in this section... Federal State Advanced Search

325

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - LADWP on AddThis.com... More in this section... Federal

326

Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Mandatory Electric Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards to someone by E-mail Share Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Facebook Tweet about Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Twitter Bookmark Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Google Bookmark Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Delicious Rank Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on Digg Find More places to share Alternative Fuels Data Center: Mandatory Electric Vehicle Supply Equipment (EVSE) Building Standards on

327

Modulating lignin in plants  

SciTech Connect

Materials and methods for modulating (e.g., increasing or decreasing) lignin content in plants are disclosed. For example, nucleic acids encoding lignin-modulating polypeptides are disclosed as well as methods for using such nucleic acids to generate transgenic plants having a modulated lignin content.

Apuya, Nestor; Bobzin, Steven Craig; Okamuro, Jack; Zhang, Ke

2013-01-29T23:59:59.000Z

328

RECIPIENT:Soitec u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Soitec Soitec u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DE1'ERl\fiNATION Page 1 of3 STATE : CA PROJECf TITLE: SANfa.b: Module Manufacturing Facility Funding Opportu nity Announcement Number DE-FOA-Q000566 Procurement Instrument Number EEOOO5739 NEPA Control Number elD Number GFO-OOO5739-001 Based on my review orlbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451. IA), I have made the following determination : ex, EA, I<.:IS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination 81 .31 Installation or relocation of machinery and equipment Information gathering (induding. but not limited to, literature surveys, inventories, site visits, and audits),

329

Science Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

330

Projection Systems  

Science Journals Connector (OSTI)

As a general rule, broad-band sources which employ projection optics are the most difficult to evaluate. In addition to the problems encountered in evaluating exposed lamps, one must characterize the projected...

David Sliney; Myron Wolbarsht

1980-01-01T23:59:59.000Z

331

Circle Project  

E-Print Network (OSTI)

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied...

332

Hydropower Projects  

Energy.gov (U.S. Department of Energy (DOE))

This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

333

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT DISTRIBUTED GENERATION team into areas of significant importance to commercial distributed generation sources with verylow in staff expertise and access to equipment made by owners of the distributed generators as none

334

Electrical Metering Equipment and Sensors Appendix D -Electrical Metering Equipment and Sensors  

E-Print Network (OSTI)

Appendix D ­ Electrical Metering Equipment and Sensors #12;D.1 Appendix D - Electrical Metering schedules, and view system status from the convenience of a standard web-browser. D.2 Metering Data Logger

335

Wind Equipment: Creating Jobs Along the Lake Erie Shore | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Equipment: Creating Jobs Along the Lake Erie Shore Wind Equipment: Creating Jobs Along the Lake Erie Shore Wind Equipment: Creating Jobs Along the Lake Erie Shore August 16, 2012 - 9:36am Addthis 1 of 3 Finished wind tower sections await load-out at Ventower Industries, state-of-the-art fabrication facility in Monroe, MI. Image: Ventower Industries. 2 of 3 Ventower operations team loading out first sections produced at Monroe plant. Image: Ventower Industries 3 of 3 Production team members in attendance at Ventower's ribbon cutting ceremony in August 2011. Image: Ventower Industries Monroe, Michigan Niketa Kumar Niketa Kumar Public Affairs Specialist, Office of Public Affairs What are the key facts? Ventower Industries supplies wind turbine towers for projects throughout the Great Lakes and Northeast regions. Since opening, the company has grown to 53 employees.

336

Thermoelectrics Partnership: Automotive Thermoelectric Modules...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Solution for Automotive Thermoelectric Modules Application Thermoelectrics Partnership: Automotive Thermoelectric Modules with Scalable Thermo- and Electro-Mechanical Interfaces...

337

Sample Environment Equipment Categories - ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Home › Instruments › Sample Environment Home › Instruments › Sample Environment Sample Environment: Categories of Equipment All Ancillary Equipment Auto Changer Closed Cycle Refrigerators Closed Cycle Refrigerators - Bottom Loading Closed Cycle Refrigerators - Top Loading Furnaces Gas Handling Gas Panel High Pressure Systems Liquid Helium Cryostats Magnet Systems Other Special Environments Sample Cell Sample Stick Ultra Low Temperature Devices Sample Environment: by Beam Line All BL-11A-POWGEN BL-11B-MANDI BL-12-TOPAZ BL-13-Fundamental Neutron Physics Beam Line BL-14A-BL-14A BL-14B-HYSPEC BL-15-Neutron Spin Echo (NSE) BL-16B-VISION BL-17-SEQUOIA BL-18-ARCS BL-1A-TOF-USANS BL-1B-NOMAD BL-2-BASIS BL-3-SNAP BL-4A-Magnetism Reflectometer BL-4B-Liquids Reflectometer BL-5-Cold Neutron Chopper Spectrometer (CNCS) BL-6-EQ-SANS

338

Laboratory Equipment Donation Program - Guidelines/FAQ  

Office of Scientific and Technical Information (OSTI)

Frequently Asked Questions Frequently Asked Questions Who is eligible to apply for equipment? Due to budget constraints, the free shipping program for "high need schools" has been discontinued; and middle and high schools are no longer eligible to participate in the Laboratory Equipment Donation Program (LEDP) program. Participation in the LEDP is limited to accredited, post graduate, degree granting institutions including universities, colleges, junior colleges, technical institutes, museums, or hospitals, located in the U.S. and interested in establishing or upgrading energy-oriented educational programs in the life, physical, and environmental sciences and in engineering is eligible to apply. An energy-oriented program is defined as an academic research activity dealing primarily or entirely in

339

Process Equipment Cost Estimation, Final Report  

Office of Scientific and Technical Information (OSTI)

Process Equipment Cost Estimation Process Equipment Cost Estimation Final Report January 2002 H.P. Loh U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 and P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and Jennifer Lyons and Charles W. White, III EG&G Technical Services, Inc. 3604 Collins Ferry Road, Suite 200 Morgantown, WV 26505 DOE/NETL-2002/1169 ii Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus,

340

Documentation Requirements for Pressurized Experiment Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Documentation Requirements for Pressurized Experiment Apparatus Documentation Requirements for Pressurized Experiment Apparatus PSSC NOTE01 15-Jan-2013 When bringing a piece of apparatus to the APS for an experiment that will involve pressure, whether it is to be used on a beamline during a measurement or in a laboratory to prepare the sample prior to the experiment, the hazards associated with the equipment must be reviewed. To review the equipment and make any recommendations, a certain level of documentation must be provided by the experimenter. The length and depth of the documentation should be commensurate with the complexity of the system. 1. Description of apparatus a. Description of the assembly and operation of the system. b. State the maximum working pressure, working fluid (liquid or gas) used to

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Fermilab | Recovery Act | General Infrastructure Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

General Infrastructure Projects General Infrastructure Projects High Availability Computing Center The Computing Division provides administrative, technical and physical support of central computing, storage and networking equipment critical to the success of the lab’s scientific mission. Before the renovation, Feynman Computing Center housed the only high availability computing center on the Fermilab campus, which operated at its electrical capacity. The requirements for a high availability computing center include backup infrastructure support for computing equipment that operates continuously, such as networking, web and email services, experiment databases and file serving. Electrical service must be backed up by both an uninterrupted power supply system and a standby electrical generator.

342

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlproject 4. Major equipment to be used

343

BCM 1 Equipment Inventory | Sample Preparation Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Equipment Inventory 1 Equipment Inventory « Biology Chemistry & Material Science Laboratory 1 Title Equipment Type Description Agilent 8453 UV-Vis Spectrophotometer Analytical Agilent 8453 UV-VIS diode-array spectrophotometer. Wavelength range 190-1100 nm with a 1 nm optical slit width. Disposable plastic cuvettes are available in the lab, and quartz cuvettes and microcuvettes are available on a check-out basis. Beckman GPKR Centrifuge Centrifuge Beckman GPKR refrigerated centrifuge with fixed angle rotor, 8000 rpm max speed, temperature range -10°C to 40°C, fits 50mL tubes. Corning 430 pH Meter pH Meter The Corning 430 pH meter is designed to handle laboratory applications from the most routine to the highly complex. Encased in spill-resistant housings and feature chemical-resistant, sealed keypad. Model 430 (pH range 0.00 to 14.00) is a basic, yet reliable meter providing accurate, efficient digital measurements. Offers simplified, four-button operation, automatic calibration and temperature compensation, % slope readout, self-diagnostics test on powerup and analog recorder output. Unique LCD shows pH, mV

344

Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Equipment Biodiesel Equipment and Fuel Tax Exemption to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Google Bookmark Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Delicious Rank Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Equipment and Fuel Tax Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Equipment and Fuel Tax Exemption

345

Alternative Fuels Data Center: Installing New E85 Equipment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installing New E85 Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data Center: Installing New E85 Equipment on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Business Case Equipment Options Equipment Installation Codes, Standards, & Safety Vehicles Laws & Incentives

346

Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Blending Blending Equipment Tax Exemption to someone by E-mail Share Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Facebook Tweet about Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Twitter Bookmark Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Google Bookmark Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Delicious Rank Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on Digg Find More places to share Alternative Fuels Data Center: Biofuel Blending Equipment Tax Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Blending Equipment Tax Exemption Qualified equipment used for storing and blending petroleum-based fuel with

347

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

348

Direct Liquid Cooling for Electronic Equipment  

SciTech Connect

This report documents a demonstration of an electronic--equipment cooling system in the engineering prototype development stage that can be applied in data centers. The technology provides cooling by bringing a water--based cooling fluid into direct contact with high--heat--generating electronic components. This direct cooling system improves overall data center energy efficiency in three ways: High--heat--generating electronic components are more efficiently cooled directly using water, capturing a large portion of the total electronic equipment heat generated. This captured heat reduces the load on the less--efficient air--based data center room cooling systems. The combination contributes to the overall savings. The power consumption of the electronic equipment internal fans is significantly reduced when equipped with this cooling system. The temperature of the cooling water supplied to the direct cooling system can be much higher than that commonly provided by facility chilled water loops, and therefore can be produced with lower cooling infrastructure energy consumption and possibly compressor-free cooling. Providing opportunities for heat reuse is an additional benefit of this technology. The cooling system can be controlled to produce high return water temperatures while providing adequate component cooling. The demonstration was conducted in a data center located at Lawrence Berkeley National Laboratory in Berkeley, California. Thirty--eight servers equipped with the liquid cooling system and instrumented for energy measurements were placed in a single rack. Two unmodified servers of the same configuration, located in an adjacent rack, were used to provide a baseline. The demonstration characterized the fraction of heat removed by the direct cooling technology, quantified the energy savings for a number of cooling infrastructure scenarios, and provided information that could be used to investigate heat reuse opportunities. Thermal measurement data were used with data center energy use modeling software to estimate overall site energy use. These estimates show that an overall data center energy savings of approximately 20 percent can be expected if a center is retrofitted as specified in the models used. Increasing the portion of heat captured by this technology is an area suggested for further development.

Coles, Henry; Greenberg, Steve

2014-03-01T23:59:59.000Z

349

EA-1137: Nonnuclear Consolidation Weapons Production Support Project for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

137: Nonnuclear Consolidation Weapons Production Support 137: Nonnuclear Consolidation Weapons Production Support Project for the Kansas City Plant, Kansas City, Missouri EA-1137: Nonnuclear Consolidation Weapons Production Support Project for the Kansas City Plant, Kansas City, Missouri SUMMARY This EA evaluates the environmental impacts of the proposal to renovate an existing building at the U.S. Department of Energy Kansas City Plant to accommodate equipment, security and environmental controls, and building restoration upon project completion, including disposal of equipment and wastes. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 21, 1995 EA-1137: Finding of No Significant Impact Nonnuclear Consolidation Weapons Production Support Project for the Kansas

350

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) Rebate - Indiana Michigan Power on Digg Find More places to share Alternative Fuels Data Center: Electric

351

Property Tax Assessment for Renewable Energy Equipment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Property Tax Assessment for Renewable Energy Equipment Property Tax Assessment for Renewable Energy Equipment Property Tax Assessment for Renewable Energy Equipment < Back Eligibility Utility Savings Category Bioenergy Water Buying & Making Electricity Solar Wind Program Info State Arizona Program Type Property Tax Incentive Rebate Amount Renewable-energy equipment assessed at 20% of its depreciated cost Provider Arizona Department of Revenue Renewable energy equipment owned by utilities and other entities operating in Arizona is assessed at 20% of its depreciated cost for the purpose of determining property tax. "Renewable energy equipment" is defined as "electric generation facilities, electric transmission, electric distribution, gas distribution or combination gas and electric transmission

352

Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Highway Electric Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements to someone by E-mail Share Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Facebook Tweet about Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Twitter Bookmark Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Google Bookmark Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Delicious Rank Alternative Fuels Data Center: Highway Electric Vehicle Supply Equipment (EVSE) Installation Requirements on Digg Find More places to share Alternative Fuels Data Center: Highway

353

Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Google Bookmark Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Delicious Rank Alternative Fuels Data Center: Electric Vehicle Supply Equipment (EVSE) and Battery Exchange Station Regulations on Digg Find More places to share Alternative Fuels Data Center: Electric

354

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission 42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission Hydrogen/Syngas Combustion 12/15/2006 FACT SHEET I. PROJECT PARTICIPANTS Parker Hannifin Corporation (Lead) Gas Turbine Fuel Systems Division, 9200 Tyler Blvd., Mentor OH 44060 PI: Dr. Adel Mansour (e-mail: amansour@parker.com, Ph.: 440-954-8171) University of California at Irvine UCI Combustion Laboratory, Irvine, CA 92617 Solar Turbines Incorporated 2200 Pacific Highway, San Diego CA 92101 II. PROJECT DESCRIPTION A. Objective(s) The overall objective of this DOE-Supported research and development program is to develop and test a next-generation, practical and scalable, high-performing, multi-point injector module for hydrogen and syngas fuels. The injector will use Parker Hannifin's

355

NREL: Vehicles and Fuels Research - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects Projects NREL's vehicles and fuels projects focus on developing, evaluating, and demonstrating innovative technologies that reduce the nation's dependence on imported petroleum and improve air quality. We work in partnership with vehicle manufacturers, equipment suppliers, fuel providers, and others to develop and commercialize vehicle and fuel technologies that meet our nation's energy and environmental goals. Advanced Combustion and Fuels Biofuels Electric Vehicle Grid Integration Energy Storage Fleet Test and Evaluation Power Electronics ReFUEL Laboratory Secure Transportation Data Vehicle Ancillary Loads Reduction Vehicle Systems Analysis Printable Version Vehicles & Fuels Research Home Projects Advanced Combustion & Fuels Biofuels Electric Vehicle Grid Integration

356

Evaluation of Maxim Module-Integrated Electronics at the DOE Regional Test Centers (Presentation)  

SciTech Connect

Module-embedded power electronics developed by Maxim Integrated are under evaluation through a partnership with the Department of Energy's Regional Test Center (RTC) program. Field deployments of both conventional modules and electronics-enhanced modules are designed to quantify the performance advantage of Maxim's products under different amounts of interrow shading, and their ability to be deployed at a greater ground-coverage ratio than conventional modules. Simulations in PVSYST have quantified the predicted performance difference between conventional modules and Maxim's modules from interrow shading. Initial performance results have identified diffuse irradiance losses at tighter row spacing for both the Maxim and conventional modules. Comparisons with published models show good agreement with models predicting the greatest diffuse irradiance losses. At tighter row spacing, all of the strings equipped with embedded power electronics outperformed their conventional peers. An even greater performance advantage is predicted to occur in the winter months when the amount of interrow shading mismatch is at a maximum.

Deline, C.; Sekulic, B.; Barkaszi, S.; Yang, J.; Kahn, S.

2014-06-01T23:59:59.000Z

357

Electricity Market Module  

U.S. Energy Information Administration (EIA) Indexed Site

Market Module Market Module This page inTenTionally lefT blank 101 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Electricity Market Module The NEMS Electricity Market Module (EMM) represents the capacity planning, dispatching, and pricing of electricity. It is composed of four submodules-electricity capacity planning, electricity fuel dispatching, electricity load and demand, and electricity finance and pricing. It includes nonutility capacity and generation, and electricity transmission and trade. A detailed description of the EMM is provided in the EIA publication, Electricity Market Module of the National Energy Modeling System 2013, DOE/EIA-M068(2013). Based on fuel prices and electricity demands provided by the other modules of the NEMS, the EMM determines the most

358

Development of Automated Production Line Processes for Solar Brightfield Modules: Final Report, 1 June 2003-30 November 2007  

SciTech Connect

Summary of progress by Spire Corporation under NREL's PV Manufacturing R&D Project to develop new automated systems for fabricating very large photovoltaic modules.

Nowlan, M.

2008-04-01T23:59:59.000Z

359

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

360

Equipment design guidance document for flammable gas waste storage tank new equipment  

SciTech Connect

This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas.

Smet, D.B.

1996-04-11T23:59:59.000Z

Note: This page contains sample records for the topic "module projects equipment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual  

SciTech Connect

A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.

DALE, R.N.

2000-05-01T23:59:59.000Z

362

Cost Benefit Analysis Modeling Tool for Electric vs. ICE Airport Ground Support Equipment Development and Results  

SciTech Connect

This report documents efforts to develop a computer tool for modeling the economic payback for comparative airport ground support equipment (GSE) that are propelled by either electric motors or gasoline and diesel engines. The types of GSE modeled are pushback tractors, baggage tractors, and belt loaders. The GSE modeling tool includes an emissions module that estimates the amount of tailpipe emissions saved by replacing internal combustion engine GSE with electric GSE. This report contains modeling assumptions, methodology, a users manual, and modeling results. The model was developed based on the operations of two airlines at four United States airports.

James Francfort; Kevin Morrow; Dimitri Hochard

2007-02-01T23:59:59.000Z

363

Cavity enhanced terahertz modulation  

SciTech Connect

We present a versatile concept for all optical terahertz (THz) amplitude modulators based on a Fabry-Prot semiconductor cavity design. Employing the high reflectivity of two parallel meta-surfaces allows for trapping selected THz photons within the cavity and thus only a weak optical modulation of the semiconductor absorbance is required to significantly damp the field within the cavity. The optical switching yields to modulation depths of more than 90% with insertion efficiencies of 80%.

Born, N., E-mail: norman.born@physik.uni-marburg.de [College of Optical Sciences, University of Arizona, 1630 E University Boulevard, Tucson, Arizona 85721 (United States); Faculty of Physics and Material Sciences Center, Philipps-Universitt Marburg, Renthof 5, 35032 Marburg (Germany); Scheller, M.; Moloney, J. V. [College of Optical Sciences, University of Arizona, 1630 E University Boulevard, Tucson, Arizona 85721 (United States)] [College of Optical Sciences, University of Arizona, 1630 E University Boulevard, Tucson, Arizona 85721 (United States); Koch, M. [Faculty of Physics and Material Sciences Center, Philipps-Universitt Marburg, Renthof 5, 35032 Marburg (Germany)] [Faculty of Physics and Material Sciences Center, Philipps-Universitt Marburg, Renthof 5, 35032 Marburg (Germany)

2014-03-10T23:59:59.000Z

364

Emissions characteristics of modern oil heating equipment  

SciTech Connect

Over the last 10 years there have been some very interesting developments in oil heating. These include higher static pressure burners, air atomizing nozzles, low firing rate nozzles, low heat loss combustion chambers and condensing boilers and furnaces. The current data base on the emissions characteristics of oil-fired residential heating equipment is based primarily on data taken in the 1970's. The objective of the work described in this report is to evaluate the effects of recent developments in oil-fired equipment on emissions. Detailed emissions measurements have been made on a number of currently available residential oil burners and whole systems selected to represent recent development trends. Some additional data was taken with equipment which is in the prototype stage. These units are a prevaporizing burner and a retention head burner modified with an air atomizing nozzle. Measurements include No{sub x}, smoke numbers, CO, gas phase hydrocarbon emissions and particulate mass emission rates. Emissions of smoke, CO and hydrocarbons were found to be significantly greater under cyclic operation for all burners tested. Generally, particulate emission rates were found to be 3 to 4 times greater in cyclic operation than in steady state. Air atomized burners were found to be capable of operation at much lower excess air levels than pressure atomized burners without producing significant amounts of smoke. As burner performance is improved, either through air atomization or prevaporization of the fuel, there appears to be a general trend towards producing CO at lower smoke levels as excess air is decreased. The criteria of adjusting burners for trace smoke may need to be abandoned for advanced burners and replaced with an adjustment for specific excess air levels. 17 refs., 15 figs., 6 tabs.

Krajewski, R.; Celebi, Y.; Coughlan, R.; Butcher, T.; McDonald, R.J.

1990-07-01T23:59:59.000Z

365

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

366

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

367

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

368

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

369

Discontinued Projects  

Energy.gov (U.S. Department of Energy (DOE))

This page lists projects that received a loan or a loan guarantee from DOE, but that are considered discontinued by LPO for one of several reasons.

370

project management  

National Nuclear Security Administration (NNSA)

the Baseline Change Proposal process. Two 400,000-gallon fire protection water supply tanks and associated pumping facilities were added. Later in the project, an additional...

371

Custom Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

and Incentive Payment - The ESIP works with utility, industry, and BPA to complete the measurement and verification, reporting and development of a custom project completion...

372