Powered by Deep Web Technologies
Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Brent Nelson | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EEREDepartmentFebruary 4,Brent Nelson About Us Brent Nelson, Ph.D. - AAAS

2

Infrared Catastrophe for Nelson's Model  

E-Print Network [OSTI]

We mathematically study the infrared catastrophe for the Hamiltonian of Nelson's model when it has the external potential in a general class. For the model, we prove the pull-through formula on ground states in operator theory first. Based on this formula, we show both non-existence of any ground state and divergence of the total number of soft bosons.

Masao Hirokawa

2005-11-08T23:59:59.000Z

3

Infrared Catastrophe for Nelson's Model Masao Hirokawa  

E-Print Network [OSTI]

Infrared Catastrophe for Nelson's Model Masao Hirokawa Department of Mathematics, Okayama University, 700­8530 Okayama, Japan Abstract We study the infrared catastrophe for Nelson's Hamiltonian general conditions. 1 Introduction The purpose of this study is to investigate the infrared catastrophe

4

Criminology Programme Collection / Elmer "Kim" Nelson (collector)  

E-Print Network [OSTI]

Criminology Programme Collection / Elmer "Kim" Nelson (collector) Compiled by Erwin Wodarczak (2007 of Creation / Physical Description o Collector's Biographical Sketch o Scope and Content o Notes Catalogue" Nelson (collector). - 1952-2007. 3 cm of textual materials. 1 audio cassette. Collector's Biographical

Handy, Todd C.

5

Water Resources Management Practicum 2006 Nelson Institute for Environmental Studies  

E-Print Network [OSTI]

2007 Water Resources Management Practicum 2006 Nelson Institute for Environmental Studies for Environmental Studies, 608/262-7996. The Water Resources Management Practicum is a regular part for Monona Bay, Madison, Wisconsin #12;Water Resources Management Practicum Nelson Institute

Sheridan, Jennifer

6

University of Wisconsin-Madison Nelson Institute for Environmental Studies  

E-Print Network [OSTI]

-Madison Nelson Institute for Environmental Studies Water Resources Management Workshop 2008 #12;An EqualUniversity of Wisconsin-Madison Nelson Institute for Environmental Studies Water Resources in an alternative format, contact Nelson Institute for Environmental Studies, 608/262-7996. The Water Resources

Sheridan, Jennifer

7

Bennett and "Proxy Actualism" Michael Nelson  

E-Print Network [OSTI]

Bennett and "Proxy Actualism" Michael Nelson Department of Philosophy University of California and Information Stanford University Stanford, CA 94305 zalta@stanford.edu Abstract Karen Bennett has recently and addressing a worry that might have been the driving force behind Bennett's claim that Linsky and Zalta's view

Zalta, Edward N.

8

Nelson G. Hairston Frederick E. Smith  

E-Print Network [OSTI]

Nelson G. Hairston Frederick E. Smith Lawrence B. Slobodkin Department of Zoology, The University of Michigan Founded the Department of Ecology & Evolution at Stony Brook University (NY) Frederick SmithFrederick Smith University of Michigan Moved on to Harvard #12;~1500 words Citations ­ more than 1500 "HSS

Jodice, Patrick

9

Nelson, Illinois: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3InformationofServices TMS IncNeetyNelson Lagoon Elec Coop

10

Sparser JohnsonLindenstrauss Transforms Daniel M. Kane # Jelani Nelson +  

E-Print Network [OSTI]

Sparser Johnson­Lindenstrauss Transforms Daniel M. Kane # Jelani Nelson + Abstract We give two di up applications where # 2 dimensionality reduction is used. 1 Introduction The Johnson

Chen, Yiling

11

Building America Whole-House Solutions for New Homes: Nelson...  

Broader source: Energy.gov (indexed) [DOE]

Case study of Nelson Construction, who worked with the Building America research partner Building Science Corporation to design ten HERS 53 homes with ICF foundations,...

12

Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies  

E-Print Network [OSTI]

Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies University Context 2006 #12;#12;Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies/263-2741 (voice/TDD), for information and referral. The Water Resources Management Practicum is a regular part

Sheridan, Jennifer

13

APPLICATION OF NELSON'S SORPTION ISOTHERM TO WOOD COMPOSITES AND OVERLAYS'  

E-Print Network [OSTI]

APPLICATION OF NELSON'S SORPTION ISOTHERM TO WOOD COMPOSITES AND OVERLAYS' Qinglin Wu Assistant. It was found that Nelson's model can be used to describe the experimental data from different composite composite materials (Suchsland 1972). These relationships, known as sorption isotherms, greatly affect

14

Infrared regular representation of the three dimensional massless Nelson model  

E-Print Network [OSTI]

Infrared regular representation of the three dimensional massless Nelson model J#19;ozsef L this Gaussian measure space. KEYWORDS: Nelson's scalar #12;eld model, infrared regular representation, ground] of a spinless electron coupled to a scalar massless Bose #12;eld is infrared divergent in 3 space dimensions

15

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 1 October 6, 2011 Submitted by: R. Strykowsky NSTX Upgrade Project Manager _____________________________ M. Williams Associate Director, PPPL

Princeton Plasma Physics Laboratory

16

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 3 October 12, 2012 Administrative Change Submitted by: ______________________________ R. Strykowsky NSTX Upgrade Project Manager Anthony Indelicato

Princeton Plasma Physics Laboratory

17

Auxiliary power controls on the Nelson River HVDC scheme  

SciTech Connect (OSTI)

This paper describes the auxiliary power controls on the Nelson River HVDC scheme. It shows how the fast control feature of the HVDC link can be utilized to enhance the operation of an integrated ac/dc power system.

Chand, J. (Manitoba Hydro, Winnipeg, Manitoba (CA))

1992-02-01T23:59:59.000Z

18

John S. Nelson Distinguished Graduate Fellowship The John S. Nelson Distinguished Graduate Fellowship is a competitive fellowship aimed at equipping  

E-Print Network [OSTI]

members for further information: · William Cronon, Professor , History, Geography, & Environmental Studies significant global impact throughout their future careers in the broad area of sustainability. Sustainability Institute for Environmental Studies. Program Requirements: Recipients of the Nelson Fellowship must

Wisconsin at Madison, University of

19

Capturing Energy Upgrades  

Broader source: Energy.gov [DOE]

Provides an overview of how to capture the value of energy efficiency upgrades in the real estate market, from CNT Energy.

20

The infrared behaviour in Nelson's model of a quantum particle coupled to a massless scalar field  

E-Print Network [OSTI]

The infrared behaviour in Nelson's model of a quantum particle coupled to a massless scalar field J, Russia minl@iitp.ru Abstract We prove that Nelson's massless field model is infrared divergent in three. KEYWORDS: Nelson's scalar field model, infrared divergence, ground state, Gibbs measure #12; 1 Introduction

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

MO. REV. MO. MAGNETIC CLEANLINESS GUIDELINES  

E-Print Network [OSTI]

in the ALSEP Systems Engineering Magnetic Cleanliness File. #12;NO. REV. NO. ATM-865 MAGNETIC CLEANLINESS Engineering Magnetic Cleanliness File. #12;MO. REV. MO. ATM-865 MAGNETIC CLEANLINESS GUIDELINES PAGE 1 Of 3 DATE 4/6/70 The purpose

Rathbun, Julie A.

22

Sparser JohnsonLindenstrauss Transforms Daniel M. Kane # Jelani Nelson +  

E-Print Network [OSTI]

Sparser Johnson­Lindenstrauss Transforms Daniel M. Kane # Jelani Nelson + Abstract We give two di#erent Johnson­Lindenstrauss distribu­ tions, each with column sparsity s = #(# -1 log(1/#)) and embedding be sampled from a seed of O(log(1/#) log d) uniform random bits. Some applications that use Johnson

Chen, Yiling

23

DESIGNING AN ECOLOGY OF DISTRIBUTED AGENTS Nelson Minar  

E-Print Network [OSTI]

DESIGNING AN ECOLOGY OF DISTRIBUTED AGENTS by Nelson Minar B.A. Mathematics (1994) Reed College, Departmental Committee on Graduate Students Program in Media Arts and Sciences #12; #12; DESIGNING AN ECOLOGY is an organizing principle for documents. This thesis introduces the idea of an ecology of distributed agents

24

Value for Money Policy Originator name: Ed Nelson & James Newby  

E-Print Network [OSTI]

Value for Money Policy Originator name: Ed Nelson & James Newby Department: Business Support Policy and the incorporation of a value for money approach to all its activities. The pursuit of economy, efficiency every penny must be earned, it has a responsibility to achieve value for money from all its activities

Doran, Simon J.

25

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii Table of Contents 1 ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

26

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record/schedule baseline updates #12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

27

Energy Upgrade California  

Broader source: Energy.gov [DOE]

The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified...

28

Nelson County, Kentucky: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3InformationofServices TMS IncNeety InternationalNelson County,

29

Nelson County, North Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3InformationofServices TMS IncNeety InternationalNelson

30

Nelson, New York: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3InformationofServices TMS IncNeetyNelson Lagoon Elec

31

City of Nelson, Nebraska (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (UtilityHolyrood,Martinsville,Moultrie,Nelson Place: Nebraska

32

Supporting Information -S1-Q. Sun, H. Nelson, T. Ly, B. M. Stoltz, R. R. Julian  

E-Print Network [OSTI]

Supporting Information -S1- Q. Sun, H. Nelson, T. Ly, B. M. Stoltz, R. R. Julian Supporting Data.............................................S7 #12;Supporting Information -S2- Q. Sun, H. Nelson, T. Ly, B. M. Stoltz, R. R. Julian Figure S1 Information -S3- Q. Sun, H. Nelson, T. Ly, B. M. Stoltz, R. R. Julian Figure S2 Figure S2a: CID of [RPPGFSPFR

Stoltz, Brian M.

33

Cyclotron Institute Upgrade Project  

SciTech Connect (OSTI)

The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

2014-08-26T23:59:59.000Z

34

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record 10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director and Deputy Federal Project Director. Various OBS changes. #12;NSTX Upgrade Project Execution Plan NSTX

Princeton Plasma Physics Laboratory

35

Advanced Photon Source Upgrade Project  

ScienceCinema (OSTI)

Upgrade to Advanced Photon Source announced by Department Of Energy. Read more: http://go.usa.gov/ivZ

Mitchell, John; Gibson, Murray; Young, Linda; Joachimiak, Andrzej

2013-04-19T23:59:59.000Z

36

Tevatron detector upgrades  

SciTech Connect (OSTI)

The D0 and CDF experiments are in the process of upgrading their detectors to cope with the high luminosities projected for the remainder of Tevatron Run II. They discuss the expected Tevatron environment through 2009, the detector challenges due to increasing luminosity in this period, and the solutions undertaken by the two experiments to mitigate detector problems and maximize physics results.

Lipton, R.; /Fermilab

2005-01-01T23:59:59.000Z

37

Biochemical upgrading of oils  

DOE Patents [OSTI]

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

Premuzic, E.T.; Lin, M.S.

1999-01-12T23:59:59.000Z

38

Nelson Lagoon Elec Coop Inc | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3InformationofServices TMS IncNeetyNelson Lagoon Elec Coop Inc

39

Nelson Institute Graduate Student Guidelines for Working with Your Faculty Advisor  

E-Print Network [OSTI]

1 Nelson Institute Graduate Student Guidelines for Working with Your Faculty Advisor Purpose Your with their advisors. We know some of these points may seem obvious, yet, in an interdisciplinary program like the Nelson Institute with a mix of students on professional and academic tracks, potential advisors

Wisconsin at Madison, University of

40

Global Scratch Upgrade in Progress  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the facility is now positioned to meet the performance demands of all its clusters. By upgrading the consolidated Global Scratch, users will be able to continue taking advantage...

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Infrared problem for the Nelson model on static space-times  

E-Print Network [OSTI]

We consider the Nelson model with variable coefficients and investigate the problem of existence of a ground state and the removal of the ultraviolet cutoff. Nelson models with variable coefficients arise when one replaces in the usual Nelson model the flat Minkowski metric by a static metric, allowing also the boson mass to depend on position. A physical example is obtained by quantizing the Klein-Gordon equation on a static space-time coupled with a non-relativistic particle. We investigate the existence of a ground state of the Hamiltonian in the presence of the infrared problem, i.e. assuming that the boson mass tends to 0 at infinity.

Christian Grard; Fumio Hiroshima; Annalisa Panati; Akito Suzuki

2011-01-03T23:59:59.000Z

42

Upgraded Coal Interest Group  

SciTech Connect (OSTI)

The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

Evan Hughes

2009-01-08T23:59:59.000Z

43

Energy Efficiency Upgrades  

SciTech Connect (OSTI)

The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

Roby Williams

2012-03-29T23:59:59.000Z

44

Landscape and Home: A Sense of Place in Wisconsin Gaylord Nelson Retrospective Lecture Series  

E-Print Network [OSTI]

Landscape and Home: A Sense of Place in Wisconsin Gaylord Nelson Retrospective Lecture Series be willing to launch this lecture series on "Landscape and Home, a Sense of Place in Wisconsin," they were

Sheridan, Jennifer

45

Campus Utility Upgrades | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

will provide essential support for the Argonne Leadership Computing Facility high performance computing upgrades, expected to occur in FY 2018. Campus utility upgrades also support...

46

New synchronous compensators for the Nelson River HVDC system; Planning requirements and specifications  

SciTech Connect (OSTI)

The first units of Limestone Generating Station, the third plant on the Lower Nelson River in northern Manitoba, will come into service in the fall of 1990. Additional var compensation equipment is required at the inverter end of the Nelson River HVdc system to accommodate power from Limestone. This paper describes the system requirements of and the overall specification for the synchronous compensators selected to supply the reactive power and voltage support.

Thio, C.V.; Davies, J.B. (Manitoba Hydro, Winnipeg, Manitoba (CA))

1991-04-01T23:59:59.000Z

47

MAST Upgrade - Construction Status  

E-Print Network [OSTI]

The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: 1) Testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); 2) Adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and 3) Exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progr...

Milnes, Joe; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O'Gorman, Tom; Scannell, Rory

2015-01-01T23:59:59.000Z

48

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department...  

Energy Savers [EERE]

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of...

49

Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oil Upgrading Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading PNNL report-out at the CTAB webinar on Bio-Oil Upgrading. ctabwebinarbiooilsupgrading.pdf More...

50

Energy Upgrade California Drives Demand From Behind the Wheel...  

Energy Savers [EERE]

Upgrade California Drives Demand From Behind the Wheel Energy Upgrade California Drives Demand From Behind the Wheel Photo of a trailer with the Energy Upgrade California logo and...

51

EFITviewer UpgradesEFITviewer Upgrades MDSplus Event Management System  

E-Print Network [OSTI]

Summation System. red values indicate an alarm condition. #12;Web Tool Upgrades Different Signals may is automatic Signal names saved in a file may be pasted into Web Tool fields "Memory" of previous entries improved #12;#12;#12;Web Tools can overlay profiles #12;

Princeton Plasma Physics Laboratory

52

Infrared and ultraviolet problem for the Nelson model with variable coefficients  

E-Print Network [OSTI]

Infrared and ultraviolet problem for the Nelson model with variable coefficients C. G´erard,1 , F of the Hamiltonian in the presence of the infrared problem, i.e. assuming that the boson mass tends to 0 at infinity state one usually speaks of the infrared problem or infrared divergence. The infrared problem arises

53

3D Engineered Models for Highway Construction Gabe Nelson, P.E.  

E-Print Network [OSTI]

3D Engineered Models for Highway Construction Gabe Nelson, P.E. Snyder & Associates, Inc. Overview of 3D Engineered Models for Highway Construction Module 1 Introduction #12;3D Engineered Models & Quality ­ Protect the Environment · Every Day Counts 2 included 3D Engineered Models for Construction

54

Lake Ecosystems Nelson G Hairston Jr, Cornell University, Ithaca, New York, USA  

E-Print Network [OSTI]

are inland bodies of water that lack any direct exchange with an ocean. Lake ecosystems are made up water, waste removal, fisheries, agricultural irrigation, industrial activity and recreationLake Ecosystems Nelson G Hairston Jr, Cornell University, Ithaca, New York, USA Gregor F Fussmann

Fussman, Gregor

55

Serializability Improves Parallel Execution of Production System Jos'e Nelson Amaral \\Lambda Joydeep Ghosh  

E-Print Network [OSTI]

Serializability Improves Parallel Execution of Production System Jos'e Nelson Amaral \\Lambda 90619­900 ­ Porto Alegre, RS Austin, Texas 78712 Abstract This paper presents a new production system in hardware cost. 1 Introduction Attempts to speed up Production Systems (PS) date back to 1979 when Forgy

Amaral, José Nelson

56

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

Princeton Plasma Physics Laboratory

57

ATLAS Upgrade for sLHC Motivation  

E-Print Network [OSTI]

ATLAS Upgrade for sLHC · Motivation · LHC Upgrades · ATLAS Upgrade/schedule · R&D Variety · Russian Institutes involvement · Conclusions A.Cheplakov JINR, Dubna (on behalf of the ATLAS Collaboration) Many thanks to ATLAS colleagues for the useful information - N.Hessey, A.Loginov, A.Romaniouk, P

58

ATLAS Upgrade Week 1 November 11, 2009  

E-Print Network [OSTI]

ATLAS Upgrade Week 1 November 11, 2009 Proposal to Develop On-Detector Array-based Optical Link A. Maettig Universität Wuppertal K.K. Gan A. Pellegrino, T. Sluijk NIKHEF (LHCb) #12;ATLAS Upgrade Week 2;ATLAS Upgrade Week 3 Introduction VCSEL and PIN are available in three forms: single channel or 4

Gan, K. K.

59

Catalyst poisoning during tar-sands bitumen upgrading  

SciTech Connect (OSTI)

A number of hydrotreating catalysts are used in commercial heavy oil upgrading facilities. One of these, a CoO/MoO{sub 3}/Al{sub 2}O{sub 3} catalyst has been evaluated in a pilot plant CSTR for Tar-Sands Bitumen upgrading. Following its use in a test of 200 hours duration, the catalyst was removed, de-oiled, regenerated by air-calcination to remove the coke, and then re-tested. Samples of the coked, fresh and regenerated catalyst were each examined using surface analytical techniques. ESCA and SIMS analysis of the coked and regenerated catalyst samples show, as expected, significant contamination of the catalyst with Ni and V. In addition, the SIMS analysis clearly reveals that the edges of the catalyst pellets are rich in Ca, Mg and Fe while the Ni, V and coke are evenly distributed. Regeneration of the catalyst by calcination removes the carbonaceous material but appears not to change the distribution of the metal contaminants. Retesting of the regenerated catalyst shows a performance similar to that of the fresh catalyst. These data serve to support the view that catalyst deactivation during early use is not due to the skin of Ca and Mg on the pellets but rather via the poisoning of active sites by carbonaceous species.

Carruthers, J.D.; Brinen, J.S.; Komar, D.A.; Greenhouse, S. [CYTEC Industries, Stamford, CT (United States)

1994-12-31T23:59:59.000Z

60

Binding energy for hydrogen-like atoms in the Nelson model without cutoffs  

E-Print Network [OSTI]

In the Nelson model particles interact through a scalar massless field. For hydrogen-like atoms there is a nucleus of infinite mass and charge $Ze$, $Z > 0$, fixed at the origin and an electron of mass $m$ and charge $e$. This system forms a bound state with binding energy $E_{\\rm bin} = me^4Z^2/2$ to leading order in $e$. We investigate the radiative corrections to the binding energy and prove upper and lower bounds which imply that $ E_{\\rm bin} = me^4 Z^2/2 + c_0 e^6 + \\Ow(e^7 \\ln e)$ with explicit coefficient $c_0$ and independent of the ultraviolet cutoff. $c_0$ can be computed by perturbation theory, which however is only formal since for the Nelson Hamiltonian the smallest eigenvalue sits exactly at the bottom of the continuous spectrum.

Christian Hainzl; Masao Hirokawa; Herbert Spohn

2003-12-10T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Canada's heavy oil, bitumen upgrading activity is growing  

SciTech Connect (OSTI)

Heavy oil and bitumen upgrading activity in Canada is surging with the recent start-up of two new upgraders and with plans to build others. These new upgraders make use of modern hydrocracking technology. Articles in this special report on upgrading focus on Canada's oil and bitumen reserves, the promising technologies that upgrade them, and present details of some of the current upgrader projects. This article covers the following areas: Canada's heavy oils; Upgrading expands; Upgrading technologies; Test results; Regional upgraders; High-quality light product.

Corbett, R.A.

1989-06-26T23:59:59.000Z

62

MICHIGAN SWEEPS NEIGHBORHOODS WITH ENERGY UPGRADES | Department...  

Broader source: Energy.gov (indexed) [DOE]

on supporting local businesses and employment. BetterBuildings for Michigan developed a sustainable market for energy efficiency upgrades and thousands of qualified professionals...

63

Jefferson Lab accelerator upgrade completed: Initial operations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE to begin initial operations of the Continuous Electron Beam Accelerator Facility (CEBAF) as part of its ongoing 338 million upgrade. With the approval of Critical...

64

Upgrade Boilers with Energy-Efficient Burners  

SciTech Connect (OSTI)

This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

65

The Upgraded D0 detector  

SciTech Connect (OSTI)

The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U./Simon Fraser U. /York U., Canada /McGill U. /Beijing, Inst. High Energy Phys. /Hefei, CUST /Andes U., Bogota /Charles U. /Prague, Tech. U. /Prague, Inst. Phys. /San Francisco deQuito U. /Clermont-Ferrand U. /LPSC, Grenoble /Marseille, CPPM /Orsay, LAL /Paris U., VI-VII /DAPNIA, Saclay /Strasbourg, IReS; ,

2005-07-01T23:59:59.000Z

66

SND data acquisition system upgrade  

E-Print Network [OSTI]

The data acquisition (DAQ) system of the SND detector successfully operated during four data-taking seasons (2010-2013) at the e+e- collider VEPP-2000. Currently the collider is shut down for planned reconstruction, which is expected to increase the VEPP-2000 luminosity and data flow from the SND detector electronics by up to 10 times. Since current DAQ system implementation (electronics and computer part) does not have enough reserve for selection of events in the new environment without compromising quality, there arose the need for the system upgrade. Here we report on the major SND data acquisition system upgrade which includes developing new electronics for digitization and data transfer, complete redesign of the data network, increasing of the DAQ computer farm processing capacity and making the event building process concurrent. These measures will allow us to collect data flow from the most congested detector subsystems in parallel in contrast to the current situation. We would like to discuss also the possibility to implement full software trigger solution in the future.

A. G. Bogdanchikov; V. P. Druzhinin; A. A. Korol; S. V. Koshuba; A. I. Tekutiev; Yu. V. Usov

2014-04-02T23:59:59.000Z

67

Analysis Efforts Supporting NSTX Upgrades  

SciTech Connect (OSTI)

The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

2010-11-29T23:59:59.000Z

68

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

Princeton Plasma Physics Laboratory

69

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 1302 Title: WBS 1.1.11 Title Functional Manager P. Heitzenroeder Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS and includes design modifications and upgrade of the coil assembly stand; procedures for assembling the Center

Princeton Plasma Physics Laboratory

70

The Bottom Line Space@Penn Upgrade  

E-Print Network [OSTI]

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

71

NSTXpool Computer Upgrade December 9, 2010  

E-Print Network [OSTI]

NSTXpool Computer Upgrade WP #1685 Bill Davis December 9, 2010 #12;Work Scope Upgrade Operating System, Application Software, and Programs that run on NSTX computers using Red Hat Enterprise Linux 3. nstxpool computers + nstxops nstxWindowsPC (Control Room Display Wall) Big Blue cluster for EFIT Selected

Princeton Plasma Physics Laboratory

72

Weatherization and Workforce Guidelines for Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Home Energy Upgrades Fact Sheet Weatherization and Workforce Guidelines for Home Energy Upgrades Fact Sheet This fact sheet provides essential information about the 2011...

73

Shared Space vs. In-Unit Upgrades in Multifamily Buildings |...  

Energy Savers [EERE]

Shared Space vs. In-Unit Upgrades in Multifamily Buildings Shared Space vs. In-Unit Upgrades in Multifamily Buildings Better Buildings Neighborhood Program Multifamily Peer...

74

Sandia National Laboratories: Solar Test Facility Upgrades Complete...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrades Complete, Leading to Better Sandia Capabilities to Support Power Industry Solar Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to Support...

75

Federal Finance Facilities Available for Energy Efficiency Upgrades...  

Energy Savers [EERE]

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

76

ENERGY STAR Webinar: Financing Energy Efficient Upgrades with...  

Broader source: Energy.gov (indexed) [DOE]

ENERGY STAR Webinar: Financing Energy Efficient Upgrades with ENERGY STAR ENERGY STAR Webinar: Financing Energy Efficient Upgrades with ENERGY STAR October 21, 2014 2:00PM to...

77

ATLAS Nightly Build System Upgrade  

E-Print Network [OSTI]

The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

2013-01-01T23:59:59.000Z

78

Energy Efficiency Through Lighting Upgrades  

SciTech Connect (OSTI)

Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year?¢????s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

Kara Berst; Maria Howeth

2010-06-01T23:59:59.000Z

79

New Whole-House Solutions Case Study: Nelson Construction, Farmington, CT  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S iPartnership Program |Million DOE AwardCDC Realty,thehomeNelson

80

Mo-Si-B Alloy Development  

SciTech Connect (OSTI)

Mo-Si-B silicides consisting of the phases {alpha}-Mo (Mo solid solution), Mo{sub 3}Si, and Mo{sub 5}SiB{sub 2} have melting points on the order of 2000 C and have potential as ultra-high temperature structural materials. Mo-Si-B alloys can be processed such that the {alpha}-Mo is present in the form of isolated particles in a silicide matrix, or as a continuous matrix ''cementing'' individual silicide particles together. The latter microstructure is similar to that of WC-Co hard metals. This paper focuses on the relationship between the topology as well as scale of the microstructure of Mo-Mo{sub 3}Si-Mo{sub 5}SiB{sub 2} alloys, and their creep strength and fracture toughness. For example, the creep strength of Mo-Si-B alloys is improved by reducing the {alpha}-Mo volume fraction and by making the {alpha}-Mo phase discontinuous. The fracture toughness is improved by increasing the {alpha}-Mo volume fraction and by making the {alpha}-Mo phase continuous. Room temperature stress intensity factors as high as 21 MPa m{sup 1/2} were obtained. The room temperature fracture toughness of Mo-Si-B alloys can also be improved by microalloying with Zr. The room temperature ductility of Mo itself can be improved by adding MgAl{sub 2}O{sub 4} spinel particles suggesting yet another way to improve the ductile phase toughening of Mo-Si-B alloys.

Schneibel, J.H.; Kruzie, J.J.; Ritchie, R.O.

2003-04-24T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

LHCb PID Upgrade Technical Design Report  

E-Print Network [OSTI]

The LHCb upgrade will take place in the second long shutdown of the LHC, currently scheduled to begin in 2018. The upgrade will enable the experiment to run at luminosities of $2 \\times 10^{33}cm^{-2}s^{-1}$ and will read out data at a rate of 40MHz into a exible software-based trigger. All sub-detectors of LHCb will be re-designed to comply with these new operating conditions. This Technical Design Report presents the upgrade plans of the Ring Imaging Cherenkov (RICH) system, the calorimeter system and the muon system, which together provide the particle identication capabilities of the experiment.

LHCb Collaboration

2013-01-01T23:59:59.000Z

82

Development and validation of detailed controls models of the Nelson River Bipole 1 HVDC system  

SciTech Connect (OSTI)

With the Nelson River Bipole 1 mercury arc valve group replacement project and planning for the expansion of the Nelson River HVDC system with a third bipole underway, it was decided to pursue a program to develop and validate detailed models of the existing HVDC transmission facilities and their associated ac systems for use in system studies. The first phase of the program concentrated on the development of detailed controls models associated with the Bipole 1 transmission facility. Based on previous experience at Manitoba Hydro with the Electromagnetic Transient DC simulation program (EMTDC), it was decided that model development and validation would use this program. This paper presents the reasons behind the development of detailed models, the methods used in developing models related to Bipole 1, results of validation tests, difficulties encountered during the process, and the overall benefits resulting from the project. An example of applying the models to investigate a low frequency oscillation which has occurred on the dc system in the past is also presented.

Kuffel, P.; Kent, K.L.; Mazur, G.B.; Weekes, M.A. (Manitoba Hydro, Winnipeg (Canada))

1993-01-01T23:59:59.000Z

83

Upgrade Your Refinery for Energy Conservation  

E-Print Network [OSTI]

Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test...

Johnnie, D. H., Jr.; Klooster, H. J.

1983-01-01T23:59:59.000Z

84

RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE  

SciTech Connect (OSTI)

Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

Paul Tran; 293 Highway 740; Baden, NC 28009

2013-02-28T23:59:59.000Z

85

Economic Options for Upgrading Waste Heat  

E-Print Network [OSTI]

There are at least six major types of equipment that upgrade waste heat: (1) thermocompressor; (2) electric drive compressor heat pump; (3) absorption heat pump; (4) high temperature heat powered compressor heat pump; (5) reverse absorption heat...

Erickson, D. C.

1983-01-01T23:59:59.000Z

86

Advanced Photon Source Upgrade Project - Materials  

ScienceCinema (OSTI)

An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

Gibbson, Murray;

2013-04-19T23:59:59.000Z

87

Advanced Photon Source Upgrade Project - Energy  

ScienceCinema (OSTI)

An upgrade to the Advanced Photon Source (announced by DOE - http://go.usa.gov/ivZ) will help scientists better understand complex environments such as in catalytic reactions.

Gibson, Murray; Chamberlain, Jeff; Young, Linda

2013-04-19T23:59:59.000Z

88

High Flux Isotope Reactor power upgrade status  

SciTech Connect (OSTI)

A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions.

Rothrock, R.B.; Hale, R.E. [Oak Ridge National Lab., TN (United States); Cheverton, R.D. [Delta-21 Resources Inc., Oak Ridge, TN (United States)

1997-03-01T23:59:59.000Z

89

Page 1 of 17 NSTX Upgrade Project  

E-Print Network [OSTI]

INFORMATION Project Title: NSTX Upgrade Project at PPPL Total Project Cost (TPC) Range: $74.7M to $92.9M CD-0 Range 2.1 Total Project Cost Range The preliminary total project cost (TPC) range is $74.7M - $92.9M. 2Page 1 of 17 NSTX Upgrade Project Acquisition Strategy April 5, 2010 #12;Page 2 of 17 Change Log

Princeton Plasma Physics Laboratory

90

CDF central preshower and crack detector upgrade  

SciTech Connect (OSTI)

The CDF Central Preshower and Crack Detector Upgrade consist of scintillator tiles with embedded wavelength-shifting fibers, clear-fiber optical cables, and multi-anode photomultiplier readout. A description of the detector design, test results from R&D studies, and construction phase are reported. The upgrade was installed late in 2004, and a large amount of proton-antiproton collider data has been collected since then. Detector studies using those data are also discussed.

Artikov, A.; Boudagov, J.; Chokheli, D.; Drake, G.; Gallinaro, M.; Giunta, M.; Grudzinski, J.; Huston, J.; Iori, M.; Kim, D.; Kim, M.; /Dubna, JINR /Argonne /Rockefeller

2007-02-01T23:59:59.000Z

91

Johanna Nelson  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Polyester film Polymer separator Electrode Current collector Li-metal X - r a y s condenser lens pinhole sample zone plate objective lens 5 Transmission X-ray microscopy * 30...

92

High-density organic light emitting diodes by nanoimprint technology Krutarth Trivedi, Caleb Nelson, Li Tao, Mathew Goeckner, Walter Hua)  

E-Print Network [OSTI]

High-density organic light emitting diodes by nanoimprint technology Krutarth Trivedi, Caleb Nelson sources. Despite the considerable development of inorganic semiconductor based light emitting diodes of miniaturization to nanoscale. Organic light emitting diode (OLED) technology is immune to quantum confinement

Hu, Wenchuang "Walter"

93

LUDOCORE: A Logical Game Engine for Modeling Videogames Adam M. Smith, Mark J. Nelson, and Michael Mateas  

E-Print Network [OSTI]

LUDOCORE: A Logical Game Engine for Modeling Videogames Adam M. Smith, Mark J. Nelson, and Michael Mateas Abstract-- LUDOCORE is a logical "game engine", linking game rules as reasoned about by game this bridge is engineering a concise, safe, and flexible representation that is compatible with the semantics

California at Santa Cruz, University of

94

Electrodeposition of high Mo content Ni-Mo alloys under forced convection  

SciTech Connect (OSTI)

Bright, compact, adherent, metallic Ni-Mo alloys, containing over 48 wt % Mo have been electrodeposited from an aqueous solution. The Mo content, which is the highest achieved so far in induced codeposition of Ni-Mo, was determined by X-ray fluorescence spectroscopy. The absence of oxygen was verified by Auger electron spectroscopy. Electrodeposition experiments were performed on rotating cylinder electrodes and demonstrate that the Mo content of the alloy is strongly influenced by convective transport.

Podlaha, E.J.; Matlosz, M.; Landolt, D. (Ecole Polytechnique Federale de Lausanne, Lausanee (Switzerland). Dept. des materiaux)

1993-10-01T23:59:59.000Z

95

IPNS upgrade: A feasibility study  

SciTech Connect (OSTI)

Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

NONE

1995-04-01T23:59:59.000Z

96

The Mass Shell of the Nelson Model without Cut-Offs  

E-Print Network [OSTI]

The massless Nelson model describes non-relativistic, spinless quantum particles interacting with a relativistic, massless, scalar quantum field. The interaction is linear in the field. We analyze the one particle sector. First, we construct the renormalized mass shell of the non-relativistic particle for an arbitrarily small infrared cut-off that turns off the interaction with the low energy modes of the field. No ultraviolet cut-off is imposed. Second, we implement a suitable Bogolyubov transformation of the Hamiltonian in the infrared regime. This transformation depends on the total momentum of the system and is non-unitary as the infrared cut-off is removed. For the transformed Hamiltonian we construct the mass shell in the limit where both the ultraviolet and the infrared cut-off are removed. Our approach is constructive and leads to explicit expansion formulae which are amenable to rigorously control the S-matrix elements.

S. Bachmann; D. -A. Deckert; A. Pizzo

2011-06-09T23:59:59.000Z

97

Climate balance of biogas upgrading systems  

SciTech Connect (OSTI)

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

2010-01-15T23:59:59.000Z

98

MAVIS III -- A Windows 95/NT Upgrade  

SciTech Connect (OSTI)

MAVIS (Modeling and Analysis of Explosive Valve Interactions) is a computer program that simulates operation of explosively actuated valve. MAVIS was originally written in Fortran in the mid 1970`s and was primarily run on the Sandia Vax computers in use through the early 1990`s. During the mid to late 1980`s MAVIS was upgraded to include the effects of plastic deformation and it became MAVIS II. When the Vax computers were retired, the Gas Transfer System (GTS) Development Department ported the code to the Macintosh and PC platforms, where it ran as a simple console application. All graphical output was lost during these ports. GTS code developers recently completed an upgrade that provides a Windows 95/NT MAVIS application and restores all of the original graphical output. This upgrade is called MAVIS III version 1.0. This report serves both as a user`s manual for MAVIS III v 1.0 and as a general software development reference.

Hardwick, M.F. [Sandia National Labs., Livermore, CA (United States). GTS Engineering Dept.

1997-12-01T23:59:59.000Z

99

Bitumen and heavy oil upgrading in Canada  

SciTech Connect (OSTI)

A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulfur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgrader, now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional products, also based on hydrogenation, will use ebullated bed catalyst systems: the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.

Chrones, J.

1988-06-01T23:59:59.000Z

100

Bitumen and heavy oil upgrading in Canada  

SciTech Connect (OSTI)

A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulphur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgrader now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional projects, also based on hydrogenation, will use ebullated bed catalyst systems; the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.

Chrones, J. (Chrones Engineering Consultants Inc., 111 Lord Seaton Road, Willowdale, Ontario (CA)); Germain, R.R. (Alberta Oil Sands Technology and Research Authority, Edmonton, AB (Canada))

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Unique Solar Thermal Laboratory Gets an Upgrade | Department...  

Broader source: Energy.gov (indexed) [DOE]

Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This power tower is part of the...

102

EECBG Success Story: HVAC Upgrade Saving Money, Protecting History...  

Broader source: Energy.gov (indexed) [DOE]

HVAC Upgrade Saving Money, Protecting History EECBG Success Story: HVAC Upgrade Saving Money, Protecting History November 2, 2010 - 5:37pm Addthis A new heating and cooling system...

103

When Energy Efficiency Upgrades and Ghost Stories Meet | Department...  

Broader source: Energy.gov (indexed) [DOE]

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night |...

104

UPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM  

E-Print Network [OSTI]

/11/2004 page 3 of 17 1 INTRODUCTION KNMI (Royal Netherlands Meteorological Institute) has upgraded itsUPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM Hans Beekhuis Iwan Holleman the Netherlands

Stoffelen, Ad

105

Upgrading : an alternative approach towards housing reform in China  

E-Print Network [OSTI]

The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

He, Fang, 1956-

1989-01-01T23:59:59.000Z

106

Investment and Upgrade in Distributed Generation under Uncertainty  

E-Print Network [OSTI]

utility tari?s, the electricity price may be revised only Investment and Upgrade in Distributed Generation

Siddiqui, Afzal

2008-01-01T23:59:59.000Z

107

Advanced Photon Source Upgrade Creating a Better Quality of Life  

SciTech Connect (OSTI)

The upgrade will enable ultrafast X-ray pulses that could point the way to more efficient electronics and vehicles.

Linda Young

2012-11-05T23:59:59.000Z

108

The JLAB 12 GeV Energy Upgrade of CEBAF  

SciTech Connect (OSTI)

This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

Harwood, Leigh H. [JLAB

2013-12-01T23:59:59.000Z

109

Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

Not Available

2011-08-01T23:59:59.000Z

110

Steam turbine upgrades: A utility based approach  

SciTech Connect (OSTI)

In the increasingly competitive power generation markets utilities must strive towards lower electricity generation costs, whilst relying on an aging steam turbine fleet. By the year 2000 more than 25% of the global steam turbine capacity will be older than 30 years. The heat rate of such units is generally considerably higher than that of equivalent new plant, and such equipment can be further disadvantaged by increased maintenance costs and forced outage rates. Over the past decade steam turbine conversion, modification, and upgrade packages have become an increasingly important part of the European steam turbine market. Furthermore, many utilities now realize that enhanced cost-effectiveness can often be obtained by moving away from the original equipment manufacturer (OEM), and the upgrading of other manufacturers' plant is now routine within the steam turbine industry. By working closely with customers, GE has developed a comprehensive range of steam turbine upgrade packages, including advanced design steampaths which can increase the performance of existing turbine installations to levels comparable with new plant. Such packages are tailor-made to the requirements of each customer, to ensure that the most cost-effective engineering solution is identified. This paper presents an overview of GE's state-of-the-art steam turbine technology, and continues to describe typical economic models for turbine upgrades.

Wakeley, G.R.

1998-07-01T23:59:59.000Z

111

MAST-Upgrade Advancing compact fusion sources  

E-Print Network [OSTI]

of innovation. It will also put the UK in a leading position to develop engineering systems for the future to the drive towards commercial fusion power. 1. Testing reactor concepts. MAST-Upgrade will be the first machine to include the Super-X divertor design, an innovative plasma exhaust system that, if successful

112

Preparation for upgrading western subbituminous coal  

SciTech Connect (OSTI)

The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

1990-11-01T23:59:59.000Z

113

T-Farm complex alarm upgrades  

SciTech Connect (OSTI)

The alarm and controls associated with the T, TX, and TY farms are located in the 242-T control room. The design data for replacement and upgrades of the alarm panels is in this document. This task was canceled previous to the 90% design review point.

Roberts, J.B.

1995-01-01T23:59:59.000Z

114

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 7900 Title: WBS 1.7.3 Title Functional Manager L. Dudek Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary procedures and documents to support the integrated tests, and to support performance of the pre

Princeton Plasma Physics Laboratory

115

Upgrade of CEBAF from 6 Gev To 12 Gev: Status  

SciTech Connect (OSTI)

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

Harwood, Leigh [Jefferson Lab, 12000 Jefferson Ave, Newport News, VA, 23606 (United States)

2013-04-19T23:59:59.000Z

116

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network [OSTI]

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

Adare, A; Aidala, C; Ajitanand, N N; Akiba, Y; Akimoto, R; Alexander, J; Aoki, K; Apadula, N; Asano, H; Atomssa, E T; Awes, T C; Azmoun, B; Babintsev, V; Bai, M; Bai, X; Bandara, N; Bannier, B; Barish, K N; Baron, O; Bassalleck, B; Bathe, S; Baublis, V; Baumgart, S; Bazilevsky, A; Beaumier, M; Beckman, S; Belmont, R; Benjamin, G; Berdnikov, A; Berdnikov, Y; Blackburn, J; Blau, D S; Bobrek, M; Bok, J; Boose, S; Boyle, K; Britton,, C L; Brooks, M L; Bryslawskyj, J; Bumazhnov, V; Butler, C; Butsyk, S; Campbell, S; Carollo, A; Chai, J -S; Chen, C -H; Chernichenko, S; Chi, C Y; Chiu, M; Choi, I J; Choi, J B; Choi, S; Chollet, S; Christiansen, P; Chujo, T; Cianciolo, V; Citron, Z; Cole, B A; Cronin, N; Crossett, N; Csand, M; D'Orazio, L; Dairaku, S; Danley, D; Datta, A; Daugherity, M S; David, G; DeBlasio, K; Debraine, A; Dehmelt, K; Denisov, A; Deshpande, A; Desmond, E J; Dietzsch, O; Ding, L; Dion, A; Diss, P B; Do, J H; Donadelli, M; Drapier, O; Drees, A; Drees, K A; Durham, J M; Durum, A; Eberle, L; Efremenko, Y V; Engelmore, T; Enokizono, A; Esumi, S; Eyser, K O; Fadem, B; Feege, N; Fields, D E; Finger, M; FingerJr., M; Fleuret, F; Fokin, S L; Frantz, J E; Franz, A; Frawley, A D; Fukao, Y; Fusayasu, T; Gainey, K; Gal, C; Gallus, P; Garg, P; Garishvili, A; Garishvili, I; Gastaldi, F; Ge, H; Giannotti, P; Giordarno, F; Glenn, A; Gong, X; Gonin, M; Goto, Y; de Cassagnac, R Granier; Grau, N; Greene, S V; Perdekamp, M Grosse; Gu, Y; Gunji, T; Guragain, H; Hachiya, T; Haggerty, J S; Hahn, K I; Hamagaki, H; Hamilton, H F; Han, S Y; Hanks, J; Hasegawa, S; Haseler, T O S; Hashimoto, K; Hayano, R; Hayashi, S; He, X; Hemmick, T K; Hester, T; Hill, J C; Hoefferkamp, M; Hollis, R S; Homma, K; Hong, B; Hori, Y; Hoshino, T; Huang, J; Huang, S; Hutchins, J R; Ichihara, T; Ikeda, Y; Imai, K; Imazu, Y; Imrek, J; Inaba, M; Iordanova, A; Isenhower, D; Isinhue, A; Isupov, A; Ivanischev, D; Ivanov, V; Jacak, B V; Jeon, S J; Jezghani, M; Jia, J; Jiang, X; Johnson, B M; Joo, K S; Jouan, D; Jumper, D S; Kamin, J; Kanda, S; Kang, B H; Kang, J H; Kang, J S; Kapustinsky, J; Karatsu, K; Kawall, D; Kazantsev, A V; Kehayias, H -J; Key, J A; Khachatryan, V; Khandai, P K; Khanzadeev, A; Kijima, K M; Kim, C; Kim, D H; Kim, D J; Kim, E -J; Kim, H J; Kim, K -B; Kim, M; Kim, Y -J; Kim, Y K; Kimelman, B; Kiss, ; Kistenev, E; Kitamura, R; Klatsky, J; Kleinjan, D; Kline, P; Koblesky, T; Kochenda, L; Kofarago, M; Komatsu, Y; Komkov, B; Koster, J; Kotchetkov, D; Kotov, D; Kravtsov, P; Krizek, F; Kurita, K; Kuriyama, M; Kurosawa, M; Kwon, Y; Lacey, R; Lai, Y S; Lajoie, J G; Lebedev, A; Lee, G H; Lee, J; Lee, K B; Lee, K S; Lee, S; Lee, S H; Lefferts, R; Leitch, M J; Leite, M A L; Leitgab, M; Lewis, B; Li, X; Lim, S H; Lipski, A; Litvinenko, A; Liu, M X; Love, B; Lynch, D; Lynch, M; Maguire, C F; Makdisi, Y I; Makek, M; Malakhov, A; Manion, A; Manko, V I; Mannel, E; Maruyama, T; Masumoto, S; McCumber, M; McGaughey, P L; McGlinchey, D; McKay, R; McKinney, C; Meles, A; Mendoza, M; Menegasso, R; Meredith, B; Miake, Y; Mibe, T; Mignerey, A C; Milov, A; Mishra, D K; Mitchell, J T; Miyasaka, S; Mizuno, S; Mohanty, A K; Montuenga, P; Moon, T; Morrison, D P; Moskowitz, M; Motschwiller, S; Moukhanova, T V; Murakami, T; Murata, J; Mwai, A; Nagae, T; Nagamiya, S; Nagashima, K; Nagle, J L; Nagy, M I; Nakagawa, I; Nakagomi, H; Nakamiya, Y; Nakamura, K R; Nakamura, T; Nakano, K; Nattrass, C; Nederlof, A; Netrakanti, P K; Nihashi, M; Niida, T; Ninomiya, K; Nishimura, S; Northacker, D; Nouicer, R; Novak, T; Novitzky, N; Nukariya, A; Nyanin, A S; O'Brien, E; Ogilvie, C A; Oide, H; Okada, K; Koop, J D Orjuela; Osborn, J D; Oskarsson, A; sterman, L; Ozawa, K; Pancake, C; Pantuev, V; Papavassiliou, V; Park, I H; Park, J S; Park, S; Park, S K; Pate, S F; Patel, L; Patel, M; Peng, J -C; Perepelitsa, D; Perera, G D N; Peresedov, V; Peressounko, D Yu; Perry, J; Petti, R; Pinkenburg, C; Pinson, R; Pisani, R P; Popule, J; Purschke, M L; Qu, H; Radhakrishnan, S; Rak, J; Ramson, B J; Ravinovich, I; Read, K F; Reynolds, D; Reynolds, R; Riabov, V; Riabov, Y; Richardson, E; Rinn, T; Riveli, N; Roach, D; Rolnick, S D; Rosati, M; Roschin, E; Rowan, Z; Rubin, J G; Rukoyatkin, P; Ryu, M S; Safonov, A; Sahlmueller, B; Saito, N; Sakaguchi, T; Sako, H; Samsonov, V; Sano, M; Sarsour, M; Sato, S; Sawada, S; Schaefer, B; Schmoll, B K; Sedgwick, K; Seele, J; Seidl, R; Sekiguchi, Y; Sen, A; Seto, R; Sett, P; Sexton, A; Shafto, E; Sharma, D; Shaver, A; Shein, I; Shibata, T -A; Shigaki, K; Shimomura, M; Shoji, K; Shukla, P; Sicho, P; Sickles, A; Silva, C L; Silvermyr, D; Singh, B K; Singh, C P; Singh, V; Sippach, F W; Skolnik, M; Snowball, M; Solano, S; Soldatov, A; Soltz, R A; Sondheim, W E; Sorensen, S P; Soumya, M; Sourikova, I V; Stankus, P W; Steinberg, P; Stenlund, E; Stepanov, M; Ster, A; Stevens, L; Stoll, S P; Stone, M R; Sugitate, T; Sukhanov, A; Sumita, T; Sun, J; Sziklai, J; Takagui, E M

2015-01-01T23:59:59.000Z

117

CHALLENGES FOR THE SNS RING ENERGY UPGRADE  

SciTech Connect (OSTI)

The Oak Ridge Spallation Neutron Source accumulator ring presently operates at a beam power of about 1 MW with a beam energy of about 910 MeV. A power upgrade is planned to increase the beam energy to 1.3 GeV. For the accumulator ring this mostly involves modifications to the injection and extraction sections. A variety of modifications to the existing injection section were necessary to achieve 1 MW, and the tools developed and the lessons learned from this work are now being applied to the design of the new injection section. This paper will discuss the tools and the lessons learned, and also present the design and status of the upgrades to the accumulator ring.

Plum, Michael A [ORNL; Gorlov, Timofey V [ORNL; Holmes, Jeffrey A [ORNL; Hunter, W Ted [ORNL; Roseberry, Jr., R Tom [ORNL; Wang, Jian-Guang [ORNL

2012-01-01T23:59:59.000Z

118

JEFFERSON LAB 12 GEV CEBAF UPGRADE  

SciTech Connect (OSTI)

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

Rode, C. H. [Thomas Jefferson National Accelerator Facility, Newport News, Virginia, 23606 (United States)

2010-04-09T23:59:59.000Z

119

The PS Upgrade Program: Recent Advances  

E-Print Network [OSTI]

The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existing injector complex at CERN to match the future requirements of the HL-LHC (High Luminosity LHC). In this framework, the Proton Synchrotron (PS) will undergo fundamental changes for many of its main systems: the injection energy will be increased to reduce space-charge effects, the transverse damper will be improved to cope with transverse instabilities, and the RF systems will be upgraded to accelerate higher beam intensity and brightness. These hardware improvements are triggered by a series of studies meant to identify the most critical performance bottlenecks, like space charge, impedances, longitudinal and transverse instabilities, as well as electron-cloud. Additionally, alternative production schemes for the LHC-type beams have been proposed and implemented to circumvent some of the present limitations. A summary of the most recent advances of the studies, as well as the proposed hardware improvements is...

Gilardoni, SS; Bertone, C; Biancacci, N; Blas, A; Damjanovic, S; Bodart, D; Borburgh, J; Chiggiato, P; Damerau, H; Devine, JD; Dobers, T; Gourber-Pace, M; Hancock, S; Huschauer, A; Iadarola, G; Lopez Hernandez, LA; Masi, A; Mataguez, S; Metral, E; Paoluzzi, M; Persichelli, S; Pittet, S; Rossi, C; Roesler, S; Rumolo, G; Salvant, B; Steerenberg, R; Sterbini, G; Vollaire, J; Wasef, R; Ventura, L; Yin Vallgren, C; Migliorati, M

2013-01-01T23:59:59.000Z

120

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network [OSTI]

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

A. Adare; S. Afanasiev; C. Aidala; N. N. Ajitanand; Y. Akiba; R. Akimoto; J. Alexander; K. Aoki; N. Apadula; H. Asano; E. T. Atomssa; T. C. Awes; B. Azmoun; V. Babintsev; M. Bai; X. Bai; N. Bandara; B. Bannier; K. N. Barish; O. Baron; B. Bassalleck; S. Bathe; V. Baublis; S. Baumgart; A. Bazilevsky; M. Beaumier; S. Beckman; R. Belmont; G. Benjamin; A. Berdnikov; Y. Berdnikov; J. Blackburn; D. S. Blau; M. Bobrek; J. Bok; S. Boose; K. Boyle; C. L. Britton, Jr.; M. L. Brooks; J. Bryslawskyj; V. Bumazhnov; C. Butler; S. Butsyk; S. Campbell; A. Carollo; J. -S. Chai; C. -H. Chen; S. Chernichenko; C. Y. Chi; M. Chiu; I. J. Choi; J. B. Choi; S. Choi; S. Chollet; P. Christiansen; T. Chujo; V. Cianciolo; Z. Citron; B. A. Cole; N. Cronin; N. Crossett; M. Csand; L. D'Orazio; S. Dairaku; D. Danley; A. Datta; M. S. Daugherity; G. David; K. DeBlasio; A. Debraine; K. Dehmelt; A. Denisov; A. Deshpande; E. J. Desmond; O. Dietzsch; L. Ding; A. Dion; P. B. Diss; J. H. Do; M. Donadelli; O. Drapier; A. Drees; K. A. Drees; J. M. Durham; A. Durum; L. Eberle; Y. V. Efremenko; T. Engelmore; A. Enokizono; S. Esumi; K. O. Eyser; B. Fadem; N. Feege; D. E. Fields; M. Finger; M. FingerJr.; F. Fleuret; S. L. Fokin; J. E. Frantz; A. Franz; A. D. Frawley; Y. Fukao; T. Fusayasu; K. Gainey; C. Gal; P. Gallus; P. Garg; A. Garishvili; I. Garishvili; F. Gastaldi; H. Ge; P. Giannotti; F. Giordarno; A. Glenn; X. Gong; M. Gonin; Y. Goto; R. Granier de Cassagnac; N. Grau; S. V. Greene; M. Grosse Perdekamp; Y. Gu; T. Gunji; H. Guragain; T. Hachiya; J. S. Haggerty; K. I. Hahn; H. Hamagaki; H. F. Hamilton; S. Y. Han; J. Hanks; S. Hasegawa; T. O. S. Haseler; K. Hashimoto; R. Hayano; S. Hayashi; X. He; T. K. Hemmick; T. Hester; J. C. Hill; M. Hoefferkamp; R. S. Hollis; K. Homma; B. Hong; Y. Hori; T. Hoshino; J. Huang; S. Huang; J. R. Hutchins; T. Ichihara; Y. Ikeda; K. Imai; Y. Imazu; J. Imrek; M. Inaba; A. Iordanova; D. Isenhower; A. Isinhue; A. Isupov; D. Ivanischev; V. Ivanov; B. V. Jacak; S. J. Jeon; M. Jezghani; J. Jia; X. Jiang; B. M. Johnson; K. S. Joo; D. Jouan; D. S. Jumper; J. Kamin; S. Kanda; B. H. Kang; J. H. Kang; J. S. Kang; J. Kapustinsky; K. Karatsu; D. Kawall; A. V. Kazantsev; H. -J. Kehayias; J. A. Key; V. Khachatryan; P. K. Khandai; A. Khanzadeev; K. M. Kijima; C. Kim; D. H. Kim; D. J. Kim; E. -J. Kim; H. J. Kim; K. -B. Kim; M. Kim; Y. -J. Kim; Y. K. Kim; B. Kimelman; . Kiss; E. Kistenev; R. Kitamura; J. Klatsky; D. Kleinjan; P. Kline; T. Koblesky; L. Kochenda; M. Kofarago; Y. Komatsu; B. Komkov; J. Koster; D. Kotchetkov; D. Kotov; P. Kravtsov; F. Krizek; K. Kurita; M. Kuriyama; M. Kurosawa; Y. Kwon; R. Lacey; Y. S. Lai; J. G. Lajoie; A. Lebedev; G. H. Lee; J. Lee; K. B. Lee; K. S. Lee; S. Lee; S. H. Lee; R. Lefferts; M. J. Leitch; M. A. L. Leite; M. Leitgab; B. Lewis; X. Li; S. H. Lim; A. Lipski; A. Litvinenko; M. X. Liu; B. Love; D. Lynch; M. Lynch; C. F. Maguire; Y. I. Makdisi; M. Makek; A. Malakhov; A. Manion; V. I. Manko; E. Mannel; T. Maruyama; S. Masumoto; M. McCumber; P. L. McGaughey; D. McGlinchey; R. McKay; C. McKinney; A. Meles; M. Mendoza; R. Menegasso; B. Meredith; Y. Miake; T. Mibe; A. C. Mignerey; A. Milov; D. K. Mishra; J. T. Mitchell; S. Miyasaka; S. Mizuno; A. K. Mohanty; P. Montuenga; T. Moon; D. P. Morrison; M. Moskowitz; S. Motschwiller; T. V. Moukhanova; T. Murakami; J. Murata; A. Mwai; T. Nagae; S. Nagamiya; K. Nagashima; J. L. Nagle; M. I. Nagy; I. Nakagawa; H. Nakagomi; Y. Nakamiya; K. R. Nakamura; T. Nakamura; K. Nakano; C. Nattrass; A. Nederlof; P. K. Netrakanti; M. Nihashi; T. Niida; K. Ninomiya; S. Nishimura; D. Northacker; R. Nouicer; T. Novak; N. Novitzky; A. Nukariya; A. S. Nyanin; E. O'Brien; C. A. Ogilvie; H. Oide; K. Okada; J. D. Orjuela Koop; J. D. Osborn; A. Oskarsson; L. sterman; K. Ozawa; C. Pancake; V. Pantuev; V. Papavassiliou; I. H. Park; J. S. Park; S. Park; S. K. Park; S. F. Pate; L. Patel; M. Patel; J. -C. Peng; D. Perepelitsa; G. D. N. Perera; V. Peresedov; D. Yu. Peressounko; J. Perry; R. Petti; C. Pinkenburg; R. Pinson; R. P. Pisani; J. Popule; M. L. Purschke; H. Qu; S. Radhakrishnan; J. Rak; B. J. Ramson; I. Ravinovich; K. F. Read; D. Reynolds; R. Reynolds; V. Riabov; Y. Riabov; E. Richardson; T. Rinn; N. Riveli; D. Roach; S. D. Rolnick; M. Rosati; E. Roschin; Z. Rowan; J. G. Rubin; P. Rukoyatkin; M. S. Ryu; A. Safonov; B. Sahlmueller; N. Saito; T. Sakaguchi; H. Sako; V. Samsonov; M. Sano; M. Sarsour; S. Sato; S. Sawada; B. Schaefer; B. K. Schmoll; K. Sedgwick; J. Seele; R. Seidl; Y. Sekiguchi; A. Sen; R. Seto; P. Sett; A. Sexton; E. Shafto; D. Sharma; A. Shaver; I. Shein; T. -A. Shibata; K. Shigaki; M. Shimomura; K. Shoji; P. Shukla; P. Sicho; A. Sickles; C. L. Silva; D. Silvermyr; B. K. Singh; C. P. Singh; V. Singh; F. W. Sippach; M. Skolnik; M. Snowball; S. Solano; A. Soldatov; R. A. Soltz; W. E. Sondheim; S. P. Sorensen; M. Soumya; I. V. Sourikova; P. W. Stankus

2015-01-25T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

NSTX-U Control System Upgrades  

DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

Erickson, K G; Gates, D A; Gerhardt, S P; Lawson, J E; Mozulay, R; Sichta, P; Tchilinguirian, G J

2014-06-01T23:59:59.000Z

122

Upgrades to Monteburns, version 3.0  

SciTech Connect (OSTI)

Monteburns, a Monte Carlo burnup code which has the flexibility to model time-dependent isotopic changes for a variety of nuclear systems by linking the neutron transport code MCNP/X to a production/depletion code, has undergone several performance upgrades recently that have increased the code's capabilities. Once limited to a specific number of regions, enhancements have been implemented that afford a much greater number of burn materials, such that users will be more limited by the physical constraints of their computing environment as opposed to inherent limits built into the coding of Monteburns. In conjunction with the increase in the number of burn materials, parallel execution of a production/depletion code of choice has been implemented, such that users have the option of using CINDER90, 0RIGEN2, or the newly released version of ORIGEN. Finally, the recoverable energy per fission calculation was upgraded to include capture gamma energy deposited in all specified materials as a function of irradiation time. The sum of the prompt and delayed recoverable energies from fission was obtained as before. These upgrades were first tested on a rigorous 1/8 core model of a Pressurized Water Reactor with fresh, once- and twice-burned fuel. We can now model several orders of magnitude more materials using Monte Carlo techniques, which is a significant advance in the reactor modeling world. (authors)

Galloway, J. D.; Trellue, H. R. [Los Alamos National Laboratory, 30 Bikini Atoll Rd., Los Alamos, NM 87545-0001 (United States)

2012-07-01T23:59:59.000Z

123

Thermophysical Properties of U-10MO Alloy  

SciTech Connect (OSTI)

This report provides an overview of thermophysical properties of unirradiated uranium alloyed with ten weight percent molybdenum (U 10Mo), with particular focus on those material properties needed for modeling of new fuels for HPRRs (High Performance Research Reactors). The report contains both historical data available in the literature on U-10Mo, as well as more recent results conducted by the Global Threat Reduction Initiative fuel development program. The main use of the report is intended as a standard U-10Mo alloy properties reference for reactor models and simulations.

A. M. Phillips; G. S. Mickum; D. E. Burkes

2010-11-01T23:59:59.000Z

124

Methods and apparatuses for preparing upgraded pyrolysis oil  

DOE Patents [OSTI]

Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

2013-10-01T23:59:59.000Z

125

THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES | Department...  

Energy Savers [EERE]

upgrades. RREA used a home energy makeover contest to educate homeowners and drive demand. RREA also engaged faith-based institutions and neighborhood associations in its...

126

UNIVERSITY PARK SCHOOLS SMALL TOWNS ON UPGRADES | Department...  

Energy Savers [EERE]

performance benchmarks to create a list of preferred contractors and provided quality control on the upgrades performed through the program. KEY TAKEAWAYS By piloting STEP in...

127

Idaho Power- Easy Upgrades for Simple Retrofits Rebate Program  

Broader source: Energy.gov [DOE]

Idaho Power offers incentives for its commercial and industrial customers in Idaho and Oregon to upgrade to more efficient equipment in facilities. They provide incentives for lighting equipment...

128

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange...  

Broader source: Energy.gov (indexed) [DOE]

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities Case study details the U.S. Department of Defense (DOD) Exchange (formerly the Army and Air Force...

129

Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Algal Biofuels Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Bioenergy Technologies Office Conversion R&D Pathway: Whole Algae Hydrothermal Liquefaction...

130

California Member Connects Solar Adoption With Upgrades | Department...  

Broader source: Energy.gov (indexed) [DOE]

Photo of a young man working on solar panels. Studies on the connection between solar adoption and energy upgrades by Better Buildings Residential Network member Center for...

131

Media Advisory - Jefferson Lab 12 GeV Upgrade Groundbreaking...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for its 310 million 12 GeV Upgrade project. When: Tuesday, April 14, 2009. Where: CEBAF Center, Thomas Jefferson National Accelerator Facility, 12000 Jefferson Avenue,...

132

Conceptual design report for Project W-420, stack monitoring upgrade  

SciTech Connect (OSTI)

This document provides the Conceptual Design for the upgrade of seven designated Tank Farm stacks to meet NESHAP Title 40, CFR, Part 61, Sub-part H requirements.

Lott, D.T., Fluor Daniel Hanford

1997-03-10T23:59:59.000Z

133

asdex upgrade results: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 3 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

134

asdex upgrade divertor: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 7 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

135

asdex upgrade enhancements: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

physical control system would do. The real time emulation of both, fusion Zachmann, Gabriel 3 Ghost surfaces and island detection Application to LHD and ASDEX Upgrade...

136

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Broader source: Energy.gov (indexed) [DOE]

Energy Upgrades Summary (Fact Sheet), Guidelines For Home Energy Professionals, Energy Efficiency & Renewable Energy (EERE) Standard Work Specifications for Single-Family Home...

137

Community based outreach strategies in residential energy upgrade programs  

E-Print Network [OSTI]

Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

McEwen, Brendan (Brendan Carl Francis)

2012-01-01T23:59:59.000Z

138

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...  

Energy Savers [EERE]

duct sealing; heating, ventilation, and air conditioning (HVAC) upgrades; sunscreens; and solar water heaters. Energize Phoenix eventually expanded its service area beyond the...

139

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange...  

Broader source: Energy.gov (indexed) [DOE]

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study 11: Commercial Kitchen Equipment (Brochure), Federal Energy...

140

What's Working in Residential Energy Efficiency Upgrade Programs...  

Energy Savers [EERE]

Texas: Best Offer Ever Produces 564 Upgrades in Record Time Better Buildings Neighborhood Program Home Accomplishments History Better Buildings Partners Stories Interviews Videos...

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...  

Energy Savers [EERE]

of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal...

142

EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

143

Office of Energy Policy and Systems Analysis Site Upgrade  

Broader source: Energy.gov [DOE]

Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

144

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

SciTech Connect (OSTI)

This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

Talmadge, M.; Biddy, M.; Dutta, A.; Jones, S.; Meyer, A.

2013-03-01T23:59:59.000Z

145

Upgrading the Vanadium Redox Battery | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500II Field Emission SEM with EDAXUpdated CapitalMichaelUpgrading

146

The value of steam turbine upgrades  

SciTech Connect (OSTI)

Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

Potter, K.; Olear, D.; [General Physics Corp. (United States)

2005-11-01T23:59:59.000Z

147

Jefferson Lab awards upgrade contracts | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJefferson Lab Click onLaserLabLabawards upgrade contracts

148

CEBAF Upgrade: Cryomodule Performance And Lessons Learned  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

2014-02-01T23:59:59.000Z

149

Bitumen utilization via partial upgrading and emulsification  

SciTech Connect (OSTI)

Further development of the oil sands resources of Alberta, Canada, is constrained by the ability of downstream refineries to process the high sulfur, high viscosity, and high asphaltene content bitumen. Recent engineering studies have demonstrated that high conversion processing of bitumen to produce synthetic crude oil shows at best marginal economics. In this paper, an alternative concept of bitumen upgrading and heavy bottoms utilization is presented. The proposed method of Phased Partial Upgrading (PPU) involves, first, separation of the bitumen into a light overhead fraction and a heavy bottom fraction using conventional processes, such as distillation or solvent deasphalting. The light overhead fraction, which resembles a typical light sour crude, can be marketed directly, or can be hydrotreated to reduce sulfur and enhance quality as catalytic cracker feedstock. The PPU heavy fraction is converted to an emulsion fuel using new techniques and a proprietary surfactant formulation. This fuel can replace coal and other heavy fuels in electrical utilities. Emulsion fuel prepared in a continuous pilot unit was successfully burned in several combustion test programs.

Sankey, B.M.; Ghosh, M.; Chakrabarty, T. [Imperial Oil Resources Limited, Calgary, Alberta (Canada)

1995-12-31T23:59:59.000Z

150

The enhanced ASDEX Upgrade pellet centrifuge launcher  

SciTech Connect (OSTI)

Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

Plckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)] [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

2013-10-15T23:59:59.000Z

151

Rebates Cut the Price of Big-Time Efficiency Upgrades  

Broader source: Energy.gov [DOE]

One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energys rebate programs that cut the cost of whole-house energy efficiency upgrades.

152

Recent ASDEX Upgrade Research in Support of ITER and DEMO  

E-Print Network [OSTI]

Energy Conference, OV2/2, St. Petersburg, Russia, 13.10.2014 · ASDEX Upgrade: machine and programme allowed (?) Virtually no disruptions #12;ASDEX Upgrade has a powerful H&CD system Neutral Beam Injection;Stagnation of core density build-up due to fuelling limit (source shifts to SOL) High SOL density leads

153

Computer Physics Communications 1 Optical Link ASICs for LHC Upgrades  

E-Print Network [OSTI]

-Layer or IBL) for the ATLAS detector for the first phase of the LHC luminosity upgrade. The ASICs are a high) at CERN will be upgraded in two phases, resulting in ten times higher luminosity. The ATLAS experiment in the lab followed by an irradiation with 24 GeV protons at the T7 irradiation facility at CERN. The results

Gan, K. K.

154

Prompt {gamma}-ray spectroscopy of the {sup 104}Mo and {sup 108}Mo fission fragments  

SciTech Connect (OSTI)

The level structures of the neutron-rich {sup 104}Mo and {sup 108}Mo nuclei have been investigated by observing prompt {gamma} rays emitted in the spontaneous fission of {sup 248}Cm with the EUROGAM spectrometer. Levels with spins up to 12{h_bar} have been observed and {gamma} branching obtained. The data can be satisfactorily described when {sup 104,108}Mo are considered as axially symmetric nuclei: in {sup 104}Mo, rotational bands based on the ground state, the one-phonon and the two-phonon {gamma}-vibrational states and a quasiparticle state have been observed, whereas in {sup 108}Mo the information is limited to the yrast band and the one phonon {gamma} band. {copyright} {ital 1996 The American Physical Society.}

Guessous, A.; Schulz, N.; Bentaleb, M.; Lubkiewicz, E. [Centre de Recherches Nucleaires, Institut National de Physique Nucleaire et de Physique des Particules, Centre National de la Recherche Scientifique, Universite Louis Pasteur, 67037 Strasbourg (France)] [Centre de Recherches Nucleaires, Institut National de Physique Nucleaire et de Physique des Particules, Centre National de la Recherche Scientifique, Universite Louis Pasteur, 67037 Strasbourg (France); Durell, J.L.; Pearson, C.J.; Phillips, W.R.; Shannon, J.A.; Urban, W.; Varley, B.J. [Department of Physics, University of Manchester, M13 9PL (United Kingdom)] [Department of Physics, University of Manchester, M13 9PL (United Kingdom); Ahmad, I.; Lister, C.J.; Morss, L.R.; Nash, K.L.; Williams, C.W. [Argonne National Laboratory, Argonne, Illinois 60439 (United States)] [Argonne National Laboratory, Argonne, Illinois 60439 (United States); Khazrouni, S. [Laboratoire de Physique Nucleaire Appliquee, Faculte des Sciences, Kenitra, Maroc (France)] [Laboratoire de Physique Nucleaire Appliquee, Faculte des Sciences, Kenitra, Maroc (France)

1996-03-01T23:59:59.000Z

155

Tunable MoS{sub 2} bandgap in MoS{sub 2}-graphene heterostructures  

SciTech Connect (OSTI)

Using density functional theory calculations with van der Waals corrections, we investigated how the interlayer orientation affects the structure and electronic properties of MoS{sub 2}-graphene bilayer heterostructures. Changing the orientation of graphene with respect to MoS{sub 2} strongly influences the type and the value of the electronic bandgap in MoS{sub 2}, while not significantly altering the binding energy between the layers or the interlayer spacing. We show that the physical origin of this tunable bandgap arises from variations in the SS interplanar distance (MoS{sub 2} thickness) with the interlayer orientation, variations which are caused by electron transfer away from the MoS bonds.

Ebnonnasir, Abbas [Department of Mechanical Engineering and Materials Science Program, Colorado School of Mines, Golden, Colorado 80401 (United States); Department of Materials Science and Engineering, University of California Los Angeles, Los Angeles, California 90095 (United States); Narayanan, Badri; Ciobanu, Cristian V., E-mail: cciobanu@mines.edu, E-mail: kodambaka@ucla.edu [Department of Mechanical Engineering and Materials Science Program, Colorado School of Mines, Golden, Colorado 80401 (United States); Kodambaka, Suneel, E-mail: cciobanu@mines.edu, E-mail: kodambaka@ucla.edu [Department of Materials Science and Engineering, University of California Los Angeles, Los Angeles, California 90095 (United States)

2014-07-21T23:59:59.000Z

156

The 12 GeV Energy Upgrade at Jefferson Laboratory  

SciTech Connect (OSTI)

Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

Pilat, Fulvia C.

2012-09-01T23:59:59.000Z

157

U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava...  

Energy Savers [EERE]

And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am...

158

E-Print Network 3.0 - asdex upgrade edge Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

159

E-Print Network 3.0 - asdex upgrade h-mode Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

160

E-Print Network 3.0 - asdex upgrade team Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... Overview of ASDEX Upgrade Results - Development of integrated operating...

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Sandia National Laboratories: Upgrades to SNL-EFDC: A Tool to...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ClimateECEnergyComputational Modeling & SimulationUpgrades to SNL-EFDC: A Tool to Balance Marine Hydrokinetic Energy Generation Efficiency with Environmental Response Upgrades to...

162

Wetting of metals and glasses on Mo  

SciTech Connect (OSTI)

The wetting of low melting point metals and Si-Ca-Al-Ti-O glasses on molybdenum has been investigated. The selected metals (Au, Cu, Ag) form a simple eutectic with Mo. Metal spreading occurs under nonreactive conditions without interdiffusion or ridge formation. The metals exhibit low (non-zero) contact angles on Mo but this requires temperatures higher than 1100 C in reducing atmospheres in order to eliminate a layer of adsorbed impurities on the molybdenum surface. By controlling the oxygen activity in the furnace, glass spreading can take place under reactive or nonreactive conditions. We have found that in the glass/Mo system the contact angle does not decrease under reactive conditions. In all cases, adsorption from the liquid seems to accelerate the diffusivity on the free molybdenum surface.

Saiz, Eduardo; Tomsia, Antoni P.; Saiz, Eduardo; Lopez-Esteban, Sonia; Benhassine, Mehdi; de Coninck, Joel; Rauch, Nicole; Ruehle, Manfred

2008-01-08T23:59:59.000Z

163

LCLS LLRF Upgrades to the SLAC Linac  

SciTech Connect (OSTI)

The Linac Coherent Light Source (LCLS) at SLAC will be the brightest X-ray laser in the world when it comes on line. In order to achieve the brightness a 200fS length electron bunch is passed through an undulator. To create the 200fS, 3kA bunch, a 10pS electron bunch, created from a photo cathode in an RF gun, is run off crest on the RF to set up a position to energy correlation. The bunch is then compressed by chicanes. The stability of the RF system is critical in setting up the position to energy correlation. Specifications derived from simulations require the RF system to be stable to below 200fS in several critical injector stations and the last kilometer of linac. The SLAC linac RF system is being upgraded to meet these requirements.

Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Hong, B.; Kotturi, K.; Krejcik, P.; Wu, J.; /SLAC; Byrd, J.; /LBL, Berkeley

2007-10-04T23:59:59.000Z

164

Steam turbine upgrading: low-hanging fruit  

SciTech Connect (OSTI)

The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

Peltier, R.

2006-04-15T23:59:59.000Z

165

Upgrading the TFTR Transrex Power Supplies  

SciTech Connect (OSTI)

In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

2009-05-29T23:59:59.000Z

166

Domestic production of medical isotope Mo-99 moves a step closer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mo-99 Domestic production of medical isotope Mo-99 moves a step closer Irradiated uranium fuel has been recycled and reused for molybdenum-99 (Mo-99) production, with...

167

Oxidation, Reduction, and Condensation of Alcohols over (MO3)3 (M=Mo, W) Nanoclusters  

SciTech Connect (OSTI)

The reactions of deuterated methanol, ethanol, 1-propanol, 1-butanol, 2-propanol, 2-butanol and t-butanol over cyclic (MO3)3 (M = Mo, W) clusters were studied experimentally with temperature programmed desorption (TPD) and theoretically with coupled cluster CCSD(T) theory and density functional theory. The reactions of two alcohols per M3O9 cluster are required to provide agreement with experiment for D2O release, dehydrogenation and dehydration. The reaction begins with the elimination of water by proton transfers and forms an intermediate dialkoxy species which can undergo further reaction. Dehydration proceeds by a ? hydrogen transfer to a terminal M=O. Dehydrogenation takes place via an ? hydrogen transfer to an adjacent MoVI = O atom or a WVI metal center with redox involved for M = Mo and no redox for M = W. The two channels have comparable activation energies. H/D exchange to produce alcohols can take place after olefin is released or via the dialkoxy species depending on the alcohol and the cluster. The Lewis acidity of the metal center with WVI being larger than MoVI results in the increased reactivity of W3O9 over Mo3O9 for dehydrogenation and dehydration.

Fang, Zongtang; Li, Zhenjun; Kelley, Matthew S.; Kay, Bruce D.; Li, Shenggang; Hennigan, Jamie M.; Rousseau, Roger J.; Dohnalek, Zdenek; Dixon, David A.

2014-10-02T23:59:59.000Z

168

Upgraded HFIR Fuel Element Welding System  

SciTech Connect (OSTI)

The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

Sease, John D [ORNL

2010-02-01T23:59:59.000Z

169

Corrosion of 304 Stainless Steel Exposed To Nitric Acid -Chloride Environments D.G. Kolman, D.K. Ford, D.P. Butt, and T.O. Nelson  

E-Print Network [OSTI]

Corrosion of 304 Stainless Steel Exposed To Nitric Acid - Chloride Environments D.G. Kolman, D.K. Ford, D.P. Butt, and T.O. Nelson Materials Corrosion and Environmental Effects Laboratory Los AlamosCl, and temperature on the general corrosion behavior of 304 stainless steel (SS), electrochemical studies were

170

P.A. Nelson S.M. Kajiura G.S. Losey Exposure to solar radiation may increase ocular UV-filtering  

E-Print Network [OSTI]

P.A. Nelson ? S.M. Kajiura ? G.S. Losey Exposure to solar radiation may increase ocular UV levels of solar radiation than they had previously experienced in the source habitat in the turbid waters spectrum, but sharks exposed to greater solar radiation showed increased UV blocking in their corneal

Kajiura, Stephen

171

61. Nelson, D. C. Oil Shale: New Technologies Defining New Opportunities. Presented at the Platts Rockies Gas & Oil Conference, Denver, CO, April  

E-Print Network [OSTI]

61. Nelson, D. C. Oil Shale: New Technologies Defining New Opportunities. Presented at the Platts I, II Modeling of the In-Situ Production of Oil from .',1 l ',".1" Oil Shale ilil 'I' 'I~ :' l of conventional oil reserves amidst increasing liquid fuel demand in the world have renewed interest in oil shale

Kulp, Mark

172

AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT  

SciTech Connect (OSTI)

The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

Snyder, Isabelle B [ORNL] [ORNL

2014-01-01T23:59:59.000Z

173

Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons  

DOE Patents [OSTI]

A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

Gordon, John Howard

2014-09-09T23:59:59.000Z

174

The Jefferson Lab 12 GeV Upgrade  

SciTech Connect (OSTI)

A major upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is in progress. Construction began in 2008 and the project should be completed in 2015. The upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and new experimental equipment in three of the experimental halls. A brief overview of this upgrade project is presented along with some highlights of the anticipated experimental program.

R.D. McKeown

2011-10-01T23:59:59.000Z

175

Superconducting RF Lab Facility Upgrades at Los Alamos  

SciTech Connect (OSTI)

Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

Katonak, D.J.; Rusnak, B.

1999-03-01T23:59:59.000Z

176

Accelerator Production Options for 99MO  

SciTech Connect (OSTI)

Shortages of {sup 99}Mo, the most commonly used diagnostic medical isotope, have caused great concern and have prompted numerous suggestions for alternate production methods. A wide variety of accelerator-based approaches have been suggested. In this paper we survey and compare the various accelerator-based approaches.

Bertsche, Kirk; /SLAC

2010-08-25T23:59:59.000Z

177

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades  

Broader source: Energy.gov [DOE]

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

178

Investigation of (110)Mo, (110)W monocrystals and Nb polycrystal implanted by oxygen ions and used as TEC electrodes  

SciTech Connect (OSTI)

In an effort to improve efficiency of a thermionic energy converter (TEC), converting thermal power into electric power, there were investigated collectors made of (110)Mo and (110)W monocrystals, and Nb polycrystal, all being implanted by oxygen ions with fluence of 1*10{sup 18} cm{sup {minus}2}. For emitters there were used (110)Mo and (110)W monocrystals, and Nb polycrystal implanted by oxygen ions, respectively. The performance of TEC with implanted electrode material is compared with this of TEC having electrodes of non-implanted materials. It is demonstrated that for emitter temperature range of 1,473 to 1,873 K employment of (110)Mo and (110)W monocrystals, implanted by oxygen ions, for TEC collector allows to increase the specific output power of a converter approximately by a factor of 1.6, and employment of implanted Nb for electrodes -- to increase this value approximately by a factor of 3, as compared with non-implanted electrode materials. The upgraded performance of TEC with implanted electrode materials is caused by the increase of minimum values of the collector working function by {approximately}0.15--0.2 eV as compared with non-implanted collectors, as well as by improvement of emitter emissive and adsorption properties due to oxygen supply from collectors at operating temperatures.

Tsakadze, L.M.

1995-12-31T23:59:59.000Z

179

Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems  

E-Print Network [OSTI]

in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return...

Ertle, J. M.

180

Financing Energy Upgrades for K-12 School Districts  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Microsoft Word - 2010 LASO TA-55 Upgrade Assessment _Activity...  

Broader source: Energy.gov (indexed) [DOE]

of actions being taken to support upgrading and future management of the TA-55 wet-pipe sprinkler system as a safety- class system. This review also satisfies a number of...

182

Capturing Energy Efficiency Upgrades in the Real Estate Transaction  

Broader source: Energy.gov [DOE]

"Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a homes energy consumption.

183

Idaho Power- Easy Upgrades for Simple Retrofits Rebate Program  

Broader source: Energy.gov [DOE]

Idaho Power offers incentives for its commercial and industrial customers in Idaho and Oregon to upgrade to more efficient equipment in their facilities. They provide rebates for lighting equipment...

184

Energy and Emissions Savings through Insulation Upgrade Projects  

E-Print Network [OSTI]

The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental...

Lettich, M.

2008-01-01T23:59:59.000Z

185

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities  

Broader source: Energy.gov [DOE]

Case study details the Exchange (formerly the Army and Air Force Exchange Service), which took a leadership role in kitchen appliance upgrades to improve water efficiency by integrating water efficiency concepts into the organization's overall sustainability plan and objectives.

186

J.R. Simplot: Burner Upgrade Project Improves Performance and...  

Broader source: Energy.gov (indexed) [DOE]

Company saved energy and money by increasing the efficiency of the steam system in its potato processing plant in Caldwell, Idaho. J.R. Simplot: Burner Upgrade Project Improves...

187

EECBG Success Story: Energy Upgrades to Save Small Arizona Town...  

Broader source: Energy.gov (indexed) [DOE]

Related Articles An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Energy Upgrades to Save Small Arizona Town...

188

Biofuels from Corn Stover: Pyrolytic Production and Catalytic Upgrading Studies  

E-Print Network [OSTI]

Due to security issues in energy supply and environmental concerns, renewable energy production from biomass becomes an increasingly important area of study. Thus, thermal conversion of biomass via pyrolysis and subsequent upgrading procedures were...

Capunitan, Jewel Alviar

2013-01-15T23:59:59.000Z

189

Using QECBs for Street Lighting Upgrades: Lighting the Way to...  

Broader source: Energy.gov (indexed) [DOE]

Summarizes how the City of San Diego leveraged 13.1 million in qualified energy conservation bonds to increase the size of a street lighting upgrade project. Author: Lawrence...

190

Microsoft Word - Noxon Radio Station Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

Action: Noxon Radio Station Upgrade Project Budget Information: Work Order 00254987 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7...

191

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

Butte Radio Station Communication Upgrade Budget Information: Work Order 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7...

192

Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the...

193

Development of CaMoO4 crystal scintillators for double beta decay experiment with 100-Mo  

E-Print Network [OSTI]

Energy resolution, alpha/beta ratio, pulse-shape discrimination for gamma rays and alpha particles, temperature dependence of scintillation properties, and radioactive contamination were studied with CaMoO4 crystal scintillators. A high sensitivity experiment to search for neutrinoless double beta decay of 100-Mo by using CaMoO4 scintillators is discussed.

A. N. Annenkov; O. A. Buzanov; F. A. Danevich; A. Sh. Georgadze; S. K. Kim; H. J. Kim; Y. D. Kim; V. V. Kobychev; V. N. Kornoukhov; M. Korzhik; J. I. Lee; O. Missevitch; V. M. Mokina; S. S. Nagorny; A. S. Nikolaiko; D. V. Poda; R. B. Podviyanuk; D. J. Sedlak; O. G. Shkulkova; J. H. So; I. M. Solsky; V. I. Tretyak; S. S. Yurchenko

2007-07-10T23:59:59.000Z

194

Optical Link ASICs for the LHC Upgrade  

E-Print Network [OSTI]

We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

2009-11-23T23:59:59.000Z

195

Combination process for upgrading residual oils  

SciTech Connect (OSTI)

This patent describes a method for upgrading high boiling residual portions of crude oils comprising metal contaminants, porphyrins, asphaltenes and high molecular weight multi-ring hydrocarbon material. It comprises: charging a high boiling residual portion of crude oil admixed with diluent in contact with suspended upflowing substantially inert fluidizable solids particulate material at an elevated thermal visbreaking temperature in a riser contact zone for a time sufficient to recover therefrom a vaporous hydrocarbon product higher boiling than gasoline partially decarbonized and demetallized to a lower contaminating metals level, quenching the vaporous product of thermal visbreaking below its dew point after separation from solids, charging quenched thermally modified high boiling hydrocarbon product with a crystalline zeolite cracking catalyst under cracking conditions for a hydrocarbon residence time in a riser cracking zone; recovering a hydrocarbon conversion product; separating a combined C{sub 4} minus wet gas product stream of the visbreaking and zeolite catalyst cracking operating to recover a C{sub 3}-C{sub 4} rich fraction separately from a C{sub 2} minus dry gas product fraction, and regenerating the crystalline zeolite contcontaining catalyst.

Busch, L.E.; Walters, P.W.; Zandona, O.

1990-01-16T23:59:59.000Z

196

Recent BES results and the BESIII upgrade  

E-Print Network [OSTI]

Using 58 million $J/\\psi$ and 14 million $\\psi(2S)$ events collected by the BESII detector at the BEPC, branching fractions or upper limits for the decays $J/\\psi$ and $\\psi(2S) \\to \\Lambda \\bar{\\Lambda} \\pi^0$ and $\\Lambda \\bar{\\Lambda} \\eta$ are measured, and the decays of $J/\\psi$ and $\\psi(2S)$ to $n K^0_S \\bar{\\Lambda}+c.c.$ are observed and measured for the first time. Finally, $R$ measurement data taken with the BESII detector at center-of-mass energies between 3.7 and 5.0 GeV are fitted to determine resonance parameters of the high mass charmonium states, $\\psi(3770)$, $\\psi(4040)$, $\\psi(4160)$, and $\\psi(4415)$. The Beijing Electron Collider is being upgraded to a two-ring collider (BEPCII) with a design luminosity of $1 \\times 10^{33}$cm$^{-2}$ s$^{-1}$ at 3.89 GeV and will operate between 2 and 4.2 GeV in the center of mass. With this luminosity, the new BESIII detector will beable to collect, for example, 10 billion $J/\\psi$ events in one year of running. BEPCII and BESIII are currently nearing completion, and commissioning of both is expected to begin in mid-2008.

Frederick A. Harris

2007-12-17T23:59:59.000Z

197

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

SciTech Connect (OSTI)

In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

2013-03-31T23:59:59.000Z

198

Process for upgrading tar sand bitumen  

SciTech Connect (OSTI)

A process is described for upgrading a charge of a tar sand bitumen concentrate containing mineral matter including fine particles which comprises contacting the charge in a riser in the presence of a low boiling organic solvent diluent with finely divided attrition-resistant particles of a hot fluidizable substantially catalytically inert solid which is substantially chemically inert to a solution of mineral acid. The contact of the charge with the particles is at high temperature and short contact time to vaporize the high hydrogen containing components of the bitumen, the period of time being less than that which induces substantial thermal cracking of the charge, at the end of the time separating the vaporizing product from the fluidizable particles. The fluidizable particles now bear a deposit of both combustible solid, adherent particles of fine particles of mineral matter and metals. The particles of inert solid are passed with deposit of combustibles and fine particles of mineral matter to a regenerator to oxidize the combustible portion of the deposits, removing at least a portion of deposit of mineral matter and metals by removing the inert solid from the regenerator and contacting removed inert solid with a hot mineral acid, and recirculating fluidizable solid depleted at least in part of deposited mineral matter to contact with incoming charge of tar sand bitumen concentrate and diluent.

Bartholic, D.B.; Reagan, W.J.

1989-04-04T23:59:59.000Z

199

Process for upgrading tar sand bitumen  

SciTech Connect (OSTI)

A process is described for upgrading a charge of a tar sand bitumen concentrate containing metal impurities, colloidal calcium-containing clay and water. It consists of contacting the charge in a riser contacting zone in the presence of a low boiling organic solvent with hot fluidizable attrition-resistant substantially catalytically-inert microspheres, which are 20 to 150 microns in diameter and are composed of previously calcined kaolin clay. The contact takes place at high temperature and short contact time, which permits vaporization of the high hydrogen containing components of the bitumen. The period of time is less than that which induces substantial thermal cracking of the charge. At the end of the time the vaporized produce is separated from the microspheres of calcined kaolin clay, the microspheres of calcined kaolin clay now bearing a deposit of combustible solid, metal impurities and adherent particles of colloidal calcium-containing clay originally contained in the bitumen concentrate, immediately reducing the temperature of the vaporized product to minimize thermal cracking and recovering the product for further refining to produce one or more premium products.

Bartholic, D.B.; Reagan, W.J.

1989-02-14T23:59:59.000Z

200

Upgrade to the Birmingham Irradiation Facility  

E-Print Network [OSTI]

The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 10^15 (1 MeV neutron equivalent (neq)) cm^-2 in 80 s with proton beam currents of 1 ?A and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of 50 1C in 30 min and aims to maintain sub-0 1C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and perform...

Dervan, P; Hodgson, P; Marin- Reyes; Parker, K; Wilson, J; Baca, M

2015-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Screening of processing and upgrading schemes  

SciTech Connect (OSTI)

The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

202

Commissioning results from the recently upgraded RHIC LLRF system  

SciTech Connect (OSTI)

During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

2011-03-28T23:59:59.000Z

203

Processing, Microstructure, and Properties of Multiphase Mo Silicide Alloys  

SciTech Connect (OSTI)

Multiphase Mo silicide alloys containing T2 (Mo{sub 5}SiB{sub 2}), Mo{sub 3}Si and Mo phases where prepared by both melting and casting (M and C) and powder metallurgical (PM) processes. Glassy phases are observed in PM materials but not in M and C materials. Microstructural studies indicate that the primary phase is Mo-rich solid solution in alloys containing {le}(9.4Si+13.8B, at. %) and T2 in alloys with {ge}(9.8Si+14.6B). An eutectic composition is estimated to be close to Mo-9.6Si-14.2B. The mechanical properties of multiphase silicide alloys were determined by hardness, tensile and bending tests at room temperature. The multiphase alloy MSB-18 (Mo-9.4Si-13.8B) possesses a flexure strength distinctly higher than that of MoSi{sub 2} and other Mo{sub 5}Si{sub 3} silicide alloys containing no Mo particles. Also, MSB-18 is tougher than MoSi{sub 2} by a factor of 4.

Heatherly, L.; Liu, C.T.; Schneibel, J.H.

1998-11-30T23:59:59.000Z

204

Neutron Hole States of Mo-93,95  

E-Print Network [OSTI]

I I I0 IO 20 3040 50 60 0 I I I I I I IO 20 30 40 5Q 60 IO 2- 0 I I I lo 20 X) 40 50 60 I j I I I l 0 lo 20 30 4050 60 8, .(deg) 8,~. (deg) {deg) {deg) FIG. 2. Angular distributions for the +Mo(P, d)93Mo reaction. The errors sho....20 l X=2 0.769 2=4 0.8l6 2=2 Mo(d, t) Mo l IGO= P IQ IO? IG 10 IQ 10 IGO? IQ I I I I l.092 2=2+4 = IO IQ)- l.674 All the angular distributions obtained along mith the D%'BA fits for the states analyzed in the "Mo(d, t)9'Mo...

Bindal, P. K.; Youngblood, David H.; Kozub, R. L.

1977-01-01T23:59:59.000Z

205

SLHC, the High-Luminosity Upgrade (public event)  

ScienceCinema (OSTI)

In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

None

2011-10-06T23:59:59.000Z

206

Experimental Study of In-Situ Upgrading for Heavy Oil Using Hydrogen Donors and Catalyst under Steam Injection Condition  

E-Print Network [OSTI]

1% compared with pre-upgrading mixture. It meant that hydrogen donors and catalyst had strong synergetic effects on heavy oil upgrading. We also found that 300 C was an effective temperature for heavy oil upgrading with obvious viscosity reduction...

Zhang, Zhiyong

2012-07-16T23:59:59.000Z

207

Mo Year Report Period: EIA ID NUMBER:  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"Click worksheet9,1,50022,3,,,,6,1,,781 2,328 2,683DieselValuesEIA-782A and EIA-782B:0 U.S. Energy1‹Mo

208

The 12 GeV JLab Upgrade Project  

E-Print Network [OSTI]

The upgrade of the CEBAF Accelerator at Jefferson Lab to 12 GeV will deliver high luminosity and high quality beams, which will open unique opportunities for studies of the quark and gluon structure of hadrons in the valence region. Such physics will be made accessible by substantial additions to the experimental equipment in combination with the increased energy reach of the upgraded machine. The emphasis of the talk will be on the program in a new experimental Hall D designed to search for gluonic excitations.

Elton S. Smith

2009-01-21T23:59:59.000Z

209

The 12 GeV JLab Upgrade Project  

SciTech Connect (OSTI)

The upgrade of the CEBAF Accelerator at Jefferson Lab to 12 GeV will deliver high luminosity and high quality beams, which will open unique opportunities for studies of the quark and gluon structure of hadrons in the valence region. Such physics will be made accessible by substantial additions to the experimental equipment in combination with the increased energy reach of the upgraded machine. The emphasis of the talk will be on the program in a new experimental Hall D designed to search for gluonic excitations.

Smith, Elton

2009-01-01T23:59:59.000Z

210

MoRu/Be multilayers for extreme ultraviolet applications  

DOE Patents [OSTI]

High reflectance, low intrinsic roughness and low stress multilayer systems for extreme ultraviolet (EUV) lithography comprise amorphous layers MoRu and crystalline Be layers. Reflectance greater than 70% has been demonstrated for MoRu/Be multilayers with 50 bilayer pairs. Optical throughput of MoRu/Be multilayers can be 30-40% higher than that of Mo/Be multilayer coatings. The throughput can be improved using a diffusion barrier to make sharper interfaces. A capping layer on the top surface of the multilayer improves the long-term reflectance and EUV radiation stability of the multilayer by forming a very thin native oxide that is water resistant.

Bajt, Sasa C. (Livermore, CA); Wall, Mark A. (Stockton, CA)

2001-01-01T23:59:59.000Z

211

Motor System Upgrades Smooth the Way to Savings of $700,000 at...  

Broader source: Energy.gov (indexed) [DOE]

System Upgrades Smooth the Way to Savings of 700,000 at Chevron Refinery Motor System Upgrades Smooth the Way to Savings of 700,000 at Chevron Refinery Chevron, the largest U.S....

212

Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Efficiency Upgrades Make a Big Difference to a Small Organization Energy Efficiency Upgrades Make a Big Difference to a Small Organization Photo of a man and woman standing outside...

213

Catalytic Properties of Supported MoO3 Catalysts for Oxidative Dehydrogenation of Propane  

E-Print Network [OSTI]

Catalytic Properties of Supported MoO3 Catalysts for Oxidative Dehydrogenation of Propane Kaidong The effects of MoOx structure on propane oxidative dehydrogenation (ODH) rates and selectivity were examined with those obtained on MoOx/ZrO2. On MoOx/Al2O3 catalysts, propane turnover rate increased with increasing Mo

Iglesia, Enrique

214

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

215

Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

Not Available

2012-11-01T23:59:59.000Z

216

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Progress Report on Joint ATLAS/CMS  

E-Print Network [OSTI]

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Progress Report on Joint ATLAS/CMS SLHC Opto ATLAS Tracker Upgrade Workshop 2 Outline Introduction Subgroups activities Summary #12;K.K. Gan ATLAS System #12;K.K. Gan ATLAS Tracker Upgrade Workshop 4 Group A: Lesson Learned and to be Learned from LHC

Gan, K. K.

217

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module  

E-Print Network [OSTI]

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module and a Frontend of the optimum technology and layout of the tracking detectors for the upgraded ATLAS ID. The goal for the intermediate tracking region in the upgraded ATLAS ID. We anticipate that much of the work would then also

California at Santa Cruz, University of

218

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Nov 5, 2008  

E-Print Network [OSTI]

Upgrade Workshop 5 Optical Fiber Irradiation Corning Infinicor GRIN fiber irradiated with 's from Co60 Upgrade Workshop 6 Optical Fiber Irradiation assume L = 3,000 fb-1 including safety factor of 1 Radiation-Hardness of Optical Components #12;K.K. Gan ATLAS Tracker Upgrade Workshop 2 Outline

Gan, K. K.

219

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network [OSTI]

describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work Safety Management Objective of this project is: 1. To integrate safety into all work management and work to Work Being Performed Operations Authorization This Integrated Safety Management Plan describes

Princeton Plasma Physics Laboratory

220

Upgraded recovery boiler meets low air emissions standards  

SciTech Connect (OSTI)

In the fall of 1990, the Boise Cascade mill in International Falls, MN, carried out a millwide modernization project. One critical element of the project was the upgrade of their recovery boiler. As a result of the recovery boiler upgrade, the mill was required to obtain a prevention of significant deterioration (PSD) air permit. A best available control technology (BACT) assessment was performed as a requirement of the PSD regulations. Ultimately, a number of more stringent air pollution emission limits were established for the boiler, and a continuous emissions monitoring system (CEMS) was purchased and installed to report daily results to the Minnesota Pollution Control Agency. This paper describes efforts to achieve increased firing capacity in the mill's recovery boiler while meeting more severe air emissions regulations. The authors will show that each of the emissions limits, including CO, SO[sub 2], NO[sub x], TRS, and opacity, are met by the upgraded boiler, while achieving an increase in firing capacity over pre-upgrade levels of up to 40%.

La Fond, J.F.; Jansen, J.H. (Jansen Combustion and Boiler Technologies, Inc., Woodinville, WA (United States)); Eide, P. (Boise Cascade Corp., International Falls, MN (United States))

1994-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Technologies for Upgrading Light Water Reactor Outlet Temperature  

SciTech Connect (OSTI)

Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

2013-07-01T23:59:59.000Z

222

CDF Run IIb Silicon Vertex Detector DAQ Upgrade  

SciTech Connect (OSTI)

The CDF particle detector operates in the beamline of the Tevatron proton-antiproton collider at Fermilab, Batavia, IL. The Tevatron is expected to undergo luminosity upgrades (Run IIb) in the future, resulting in a higher number of interactions per beam crossing. To operate in this dense radiation environment, an upgrade of CDF's silicon vertex detector (SVX) subsystem and a corresponding upgrade of its VME-based DAQ system has been explored. Prototypes of all the Run IIb SVX DAQ components have been constructed, assembled into a test stand and operated successfully using an adapted version of CDF's network-capable DAQ software. In addition, a PCI-based DAQ system has been developed as a fast and inexpensive tool for silicon detector and DAQ component testing in the production phase. In this paper they present an overview of the Run IIb silicon DAQ upgrade, emphasizing the new features and improvements incorporated into the constituent VME boards, and discuss a PCI-based DAQ system developed to facilitate production tests.

S. Behari et al.

2003-12-18T23:59:59.000Z

223

Recent Upgrade of the Klystron Modulator at SLAC  

SciTech Connect (OSTI)

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

2011-11-04T23:59:59.000Z

224

National Spherical Torus Experiment Upgrade Status and Plans*  

E-Print Network [OSTI]

fusion nuclear environment of copious neutrons to develop an experimental database on: ­ Nuclear is unique challenge for ST-based Fusion Nuclear Science Facility · NSTX-U goals: ­ Generate ~0.3-0.4MA fullNational Spherical Torus Experiment Upgrade ­ Status and Plans* J. Menard, PPPL For the NSTX-U Team

225

Simulation of the TREAT-Upgrade Automatic Reactor Control System  

SciTech Connect (OSTI)

This paper describes the design of the Automatic Reactor Control System (ARCS) for the Transient Reactor Test Facility (TREAT) Upgrade. A simulation was used to facilitate the ARCS design and to completely test and verify its operation before installation at the TREAT facility.

Lipinski, W.C.; Kirsch, L.W.; Valente, A.D.

1984-01-01T23:59:59.000Z

226

Runner upgrading: Learning from Ontario Hydro`s experience  

SciTech Connect (OSTI)

Planning, design, and implementation of turbine runner replacement at Ontario Hydro is described in the article. The use of fully homologous modeling for upgrade projects, including both francis and propeller runner types, is outlined. Confirmation of physical model efficiency is obtained through numerical modeling. Inlet connections, setting cavitation-erosion guarantees, and other guarantees included in tender documents are also described in some detail.

Kee, D.C.; Markovich, M.S.; Munro, R.I. [Ontario Hydro (Canada)

1997-02-01T23:59:59.000Z

227

Post Production Heavy Oil Operations: A Case for Partial Upgrading  

E-Print Network [OSTI]

The transportation of heavy oil is a pressing problem. Various methods have been devised to mitigate the reluctance to flow of these highly dense and viscous oils. This study is focused on evaluating a case for post-production partial upgrading...

Lokhandwala, Taher

2012-12-05T23:59:59.000Z

228

Westover ARB Fuel Hydrant System Upgrade set to begin  

E-Print Network [OSTI]

Westover ARB Fuel Hydrant System Upgrade set to begin Story on page 4 #12;2 YANKEE ENGINEER August, many along the East Coast felt the impact of Hurricane Sandy, one of the largest hurricanes in history's way. · Make sure to fully charge your cell phone or other mobile devices so you can communicate after

US Army Corps of Engineers

229

Upgrade LCDs or TVs with improved ergonomic adjustability  

E-Print Network [OSTI]

Highlights · Upgrade LCDs or TVs with improved ergonomic adjustability · Constant Force (CFTM comfort and productivity · 5 (130 mm) height range easily meets the ergonomic height needs of the average compliant Product Sheet Affordable desktop ergonomics Neo-FlexTM LCD Stand 870-05-067, rev. 03/08/07 www

Saskatchewan, University of

230

BIG Energy Upgrade: Procurement and Supply Chain report  

E-Print Network [OSTI]

BIG Energy Upgrade: Procurement and Supply Chain report ­ Green Deal and Energy Efficiency ­ Green Deal and Energy Efficiency Retrofitting Supply Chains Delivery Professor S.C. Lenny Koh Dr Andrea........................................................................................................................... 26 4.5 Generalities on Procurement Best Practices

Wrigley, Stuart

231

T Plant secondary containment and leak detection upgrades  

SciTech Connect (OSTI)

The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.

Carlson, T.A.

1995-10-19T23:59:59.000Z

232

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench-scale. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. The project is on schedule and on budget. Task 4, a bench-scale demonstration of the ultra-fast TSA system is complete. Rapid thermal swing of an adsorbent bed using microchannels has been successfully demonstrated and the separation of a 70% methane and 30% nitrogen was purified to 92% methane. The bench-scale demonstration unit was small relative to the system dead volume for the initial phase of experiments and a purge step was added to sweep the dead volume prior to desorbing the bed and measuring purity. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement.

Anna Lee Tonkovich

2005-07-01T23:59:59.000Z

233

Mo Supply Chain for Nuclear Medicine Ladimer S. Nagurney  

E-Print Network [OSTI]

November 13, 2012 #12;Nuclear Medicine: Meeting Patient Needs with 99 Mo Ladimer S. Nagurney The 99 Mo of Physics Chemistry Biology Operations Research with some Biomedical Engineering thrown in at each step;Challenges Reactors are old nearing their end of life. Planned and unplanned shutdowns have created spot

Nagurney, Anna

234

Low rank coal upgrading in a flow of hot water  

SciTech Connect (OSTI)

Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura [Kyoto University, Kyoto (Japan). Department of Chemical Engineering

2009-09-15T23:59:59.000Z

235

Neutrino scattering off the stable even-even Mo isotopes  

SciTech Connect (OSTI)

Inelastic neutrino-nucleus reaction cross sections are studied focusing on the neutral current processes. Particularly, we investigate the angular and initial neutrino-energy dependence of the differential and integrated cross sections for low and intermediate energies of the incoming neutrino. The nuclear wave functions for the initial and final nuclear states are constructed in the context of the quasi-particle random phase approximation (QRPA) tested on the reproducibility of the low-lying energy spectrum. The results presented here refer to the isotopes Mo{sup 92}, Mo{sup 94}, Mo{sup 96}, Mo{sup 98} and Mo{sup 100}. These isotopes could play a significant role in supernova neutrino detection in addition to their use in double-beta and neutrinoless double-beta decay experiments (e.g. MOON, NEMO III)

Balasi, K. G.; Kosmas, T. S.; Divari, P. C. [Theoretical Physics Section, University of Ioannina, GR 45110 Ioannina (Greece)

2009-11-09T23:59:59.000Z

236

Upgrade of CEBAF from 6-GeV To 12-GeV: Status  

SciTech Connect (OSTI)

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plants capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

Harwood, Leigh H.

2013-04-01T23:59:59.000Z

237

Upgraded coal interest group. Quarterly report, July 1, 1995--September 30, 1995  

SciTech Connect (OSTI)

The objectives of the Upgraded Coal Interest Group (UCIG) are as follows: Review and update the status of various coal upgrading technologies and developments and critically assess the results. Perform engineering screening analyses on various coal upgrading approaches. Perform commercialization analyses that will promote the availability and use of upgraded coal products by quantifying the benefits of using them. Identify market opportunities for introduction of upgraded coals. Perform critical analyses on a variety of coals and technologies in areas important to users but not readily available. Perform critical experiments which will show the differences between technologies.

Weber, W. [Electric Power Research Inst., Chattanooga, TN (United States); Lebowitz, H.E. [Fossil Fuel Sciences, Palo Alto, CA (United States)

1995-12-31T23:59:59.000Z

238

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench scale. The project is on schedule and on budget. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement. The system has six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration will be initiated in the next fiscal year. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study.

Anna Lee Tonkovich

2004-07-01T23:59:59.000Z

239

A novel three dimensional semimetallic MoS{sub 2}  

SciTech Connect (OSTI)

Transition metal dichalcogenides (TMDs) have many potential applications, while the performances of TMDs are generally limited by the less surface active sites and the poor electron transport efficiency. Here, a novel three-dimensional (3D) structure of molybdenum disulfide (MoS{sub 2}) with larger surface area was proposed based on first-principle calculations. 3D layered MoS{sub 2} structure contains the basal surface and joint zone between the different nanoribbons, which is thermodynamically stable at room temperature, as confirmed by first principles molecular dynamics calculations. Compared the two-dimensional layered structures, the 3D MoS{sub 2} not only owns the large surface areas but also can effectively avoid the aggregation. Interestingly, although the basal surface remains the property of the intrinsic semiconductor as the bulk MoS{sub 2}, the joint zone of 3D MoS{sub 2} exhibits semimetallic, which is derived from degenerate 3d orbitals of the Mo atoms. The high stability, large surface area, and high conductivity make 3D MoS{sub 2} have great potentials as high performance catalyst.

Tang, Zhen-Kun [Beijing Computational Science Research Center, Beijing 100084 (China); Departments of Physics and Electronics, Hengyang Normal University, Hengyang 421008 (China); Zhang, Hui; Liu, Li-Min, E-mail: limin.liu@csrc.ac.cn [Beijing Computational Science Research Center, Beijing 100084 (China); Liu, Hao [Chengdu Green Energy and Green Manufacturing Technology R and D Center, Chengdu, Sichuan 610207 (China); Lau, Woon-Ming [Beijing Computational Science Research Center, Beijing 100084 (China); Chengdu Green Energy and Green Manufacturing Technology R and D Center, Chengdu, Sichuan 610207 (China)

2014-05-28T23:59:59.000Z

240

2 MW upgrade of the Fermilab Main Injector  

SciTech Connect (OSTI)

In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. An intensity upgrade to Fermilab's 120-GeV Main Injector (MI) represents an attractive concept for such a facility, which would leverage existing beam lines and experimental areas and would greatly enhance physics opportunities at Fermilab and in the U.S. With a Proton Driver replacing the present Booster, the beam intensity of the MI is expected to be increased by a factor of five. Accompanied by a shorter cycle, the beam power would reach 2 MW. This would make the MI a more powerful machine than the SNS or the J-PARC. Moreover, the high beam energy (120 GeV) and tunable energy range (8-120 GeV) would make it a unique high power proton facility. The upgrade study has been completed and published. This paper gives a summary report.

Weiren Chou

2003-06-04T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Using EPICS enabled industrial hardware for upgrading control systems  

SciTech Connect (OSTI)

Los Alamos National Laboratory has been working with National Instruments (NI) and Cosy lab to implement EPICS Input Output Controller (IOC) software that runs directly on NI CompactRIO Real Time Controller (RTC) and communicates with NI LabVIEW through a shared memory interface. In this presentation, we will discuss our current progress in upgrading the control system at the Los Alamos Neutron Science Centre (LANSCE) and what we have learned about integrating CompactRIO into large experimental physics facilities. We will also discuss the implications of using Channel Access Server for LabVIEW which will enable more commercial hardware platforms to be used in upgrading existing facilities or in commissioning new ones.

Bjorkland, Eric A [Los Alamos National Laboratory; Veeramani, Arun [NATIONAL INSTRUMENTS; Debelle, Thierry [NATIONAL INSTRUMENTS

2009-01-01T23:59:59.000Z

242

Upgrading the Radioactive Waste Management Infrastructure in Azerbaijan  

SciTech Connect (OSTI)

Radionuclide uses in Azerbaijan are limited to peaceful applications in the industry, medicine, agriculture and research. The Baku Radioactive Waste Site (BRWS) 'IZOTOP' is the State agency for radioactive waste management and radioactive materials transport. The radioactive waste processing, storage and disposal facility is operated by IZOTOP since 1963 being significantly upgraded from 1998 to be brought into line with international requirements. The BRWS 'IZOTOP' is currently equipped with state-of-art devices and equipment contributing to the upgrade the radioactive waste management infrastructure in Azerbaijan in line with current internationally accepted practices. The IAEA supports Azerbaijan specialists in preparing syllabus and methodological materials for the Training Centre that is currently being organized on the base of the Azerbaijan BRWS 'IZOTOPE' for education of specialists in the area of safety management of radioactive waste: collection, sorting, processing, conditioning, storage and transportation. (authors)

Huseynov, A. [Baku Radioactive Waste Site IZOTOP, Baku (Azerbaijan); Batyukhnova, O. [State Unitary Enterprise Scientific and Industrial Association Radon, Moscow (Russian Federation); Ojovan, M. [Sheffield Univ., Immobilisation Science Lab. (United Kingdom); Rowat, J. [International Atomic Energy Agency, Dept. of Nuclear Safety and Security, Vienna (Austria)

2007-07-01T23:59:59.000Z

243

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

SciTech Connect (OSTI)

In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

2013-03-31T23:59:59.000Z

244

Jefferson Lab 12 GeV CEBAF Upgrade  

SciTech Connect (OSTI)

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ~6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

Claus Rode

2010-04-01T23:59:59.000Z

245

Interaction Region Upgrades of e+ e- B-Factories  

SciTech Connect (OSTI)

Both the PEP-II and KEKB B-Factories have plans to upgrade their Interaction Regions (IRs) in order to improve luminosity performance. Last summer PEP-II added cooling to the IR beam pipe in order to increase beam currents thereby raising the luminosity. In addition, PEP-II is working on a design that modifies the permanent magnets near the Interaction Point (IP) for an even higher luminosity increase. KEKB is also planning an improvement to their IR that will decrease the detector beam pipe radius. In addition, KEK has a design to increase the luminosity of KEKB to 1 x 10{sup 35} cm{sup -2} sec{sup -1} which includes changes to the IR. PEP-II is also investigating the feasibility of a 1 x 10{sup 36} cm{sup -2} sec{sup -1} luminosity design. I summarize these various upgrades and concentrate on issues common to the different designs.

Sullivan, M.; /SLAC

2008-02-22T23:59:59.000Z

246

Phased approach to the LHC Insertion Upgrade and Magnet Challenges  

E-Print Network [OSTI]

The LHC is on its way for operation with beam in 2008. The first goal of CERN and the LHC community is to ensure that the collider is operated efficiently, gradually reaching its maximal performance. In parallel, discussions have started and there is already a wealth of ideas on the possible directions for upgrading the LHC insertions. In this talk, we illustrate some of the constraints limiting the upgrade scenarios, and argue that a phased approach with several intermediate targets is necessary. In the first phase, the known bottleneck in the low-? triplets needs to be removed in the perspective of the physics run of 2013. This phase relies on the mature Nb-Ti superconducting magnet technology, where improvements for a small scale production are still possible.

Ostojic, R

2008-01-01T23:59:59.000Z

247

Slum upgrading in India and Kenya: investigating the sustainability  

E-Print Network [OSTI]

I Government of India HUDCO Housing and Urban Development Corporation Limited IoG Institute of Governance JNNURM Jawaharlal Nehru National Urban Renewal Mission KP Kamgar Putla LDCs Least Developed Countries MASHAL Maharashtra Area Social... -up approaches. The case studies are of varying ages and were implemented via partnerships with differing agents including government, NGO, CBO, private developer and donors. The influence and design of the delivery model upon the upgrading sustainability...

Cronin, Victoria Louise Molly

2012-04-10T23:59:59.000Z

248

Providing protection: Agencies receive funding to repair, upgrade dams  

E-Print Network [OSTI]

Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations... totaling about $11 million. Of the 343 dams currently classified as high hazard, Scattered across Texas are almost 2,000 nondescript, earthen dams built on private land to protect property, roads, and bridges from flood damages. Some of these dams...

Wythe, Kathy

2009-01-01T23:59:59.000Z

249

Conversion Technologies for Advanced Biofuels … Carbohydrates Upgrading  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top FiveDepartmentfor Engineering NewisSecurityPARTUpgrading Report-OutUpgrading

250

Upgrading of raw oil into advanced fuel. Task 5  

SciTech Connect (OSTI)

The overall objective of the research effort is the determination of the minimum processing requirements to produce high energy density fuels (HEDF) having acceptable fuel specifications. The program encompasses assessing current technology capability; selecting acceptable processing and refining schemes; and generating samples of advanced test fuels. The Phase I Baseline Program is intended to explore the processing alternatives for producing advanced HEDF from two raw synfuel feedstocks, one from Mild Coal Gasification as exemplified by the COALITE process and one from Colorado shale oil. Eight key tasks have been identified as follows: (1) Planning and Environmental Permitting; (2) Transporting and Storage of Raw Fuel Sources and Products; (3) Screening of Processing and Upgrading Schemes; (4) Proposed Upgrading Schemes for Advanced Fuel; (5) Upgrading of Raw Oil into Advanced Fuel (6) Packaging and Shipment of Advanced Fuels; (7) Updated Technical and Economic Assessment; and, (8) Final Report of Phase I Efforts. This topical report summarizes the operations and results of the Phase I Task 5 sample preparation program. The specific objectives of Task 5 were to: Perform laboratory characterization tests on the raw COALITE feed, the intermediate liquids to the required hydroprocessing units and final advanced fuels and byproducts; and produce a minimum of 25-gal of Category I test fuel for evaluation by DOE and its contractors.

Not Available

1991-10-01T23:59:59.000Z

251

High temperature ceramic membrane reactors for coal liquid upgrading  

SciTech Connect (OSTI)

In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL's contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

Tsotsis, T.T.

1992-01-01T23:59:59.000Z

252

Snowflake divertor configuration studies for NSTX-Upgrade  

SciTech Connect (OSTI)

Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

Soukhanovskii, V A

2011-11-12T23:59:59.000Z

253

UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

Anna Lee Tonkovich

2004-01-01T23:59:59.000Z

254

Resolution studies and performance evaluation of the LHCb VELO upgrade  

E-Print Network [OSTI]

The LHCb detector at CERN is scheduled to undergo an upgrade during the second long shutdown of the LHC. As part of this upgrade, the vertex detector (VELO) will be replaced with a new hybrid pixel detector, based on an evolution of the Timepix ASIC. The performance of this detector should improve upon that achieved by the current VELO, in addition to facilitating the complete detector readout at 40 MHz. As part of the preparation for this upgrade, this thesis presents the results of studies carried out on the single hit resolution of silicon hybrid pixel detectors. The development of a particle beam telescope has been carried out to allow these studies, shown to operate with track rates in excess of 45 kHz and with a pointing resolution at the device under test of less than 2 ?m. A wide range of sensor types, thicknesses and resistivities have then been tested under different operating conditions and the results presented, with single hit resolutions varying between 4 ?m and 12 ?m depending on the conditi...

Hynds, Daniel Peter McFarlane; Soler, Paul; Parkes, Christopher

2015-03-25T23:59:59.000Z

255

Effect of Mo Dispersion Size and Water Vapor on Oxidation of Two-Phase Directionally Solidified NiAl-9Mo In-Situ Composites  

SciTech Connect (OSTI)

Oxidation of two-phase NiAl-9Mo eutectics with 3 different growth rates/2nd phase Mo dispersion sizes were investigated at 900 C in air and air with 10% water vapor. Good oxidation resistance via alumina formation was observed in dry air, with Mo volatilization loss minimized by fine submicron Mo dispersions. However, extensive Mo volatilization and in-place internal oxidation of prior Mo phase regions was observed in wet air oxidation. Ramifications of this phenomenon for the development of multi-phase high-temperature alloys are discussed

Brady, Michael P [ORNL] [ORNL; Bei, Hongbin [ORNL] [ORNL; Meisner, Roberta Ann [ORNL] [ORNL; Lance, Michael J [ORNL] [ORNL; Tortorelli, Peter F [ORNL] [ORNL

2014-01-01T23:59:59.000Z

256

Kyler Nelson Light Timer  

E-Print Network [OSTI]

designated by the user, the Arduino board will dim the light to save energy. The user designates the time instance, the light is dimmed using pulse width modulation (PWM) in the Arduino's pin number 11

Kachroo, Pushkin

257

Nelson 2 Rodrigues  

E-Print Network [OSTI]

. Family members include Jonas, the father, his wife Senhorinha, and the children, Glria, Edmundo, Guilherme, and Nono. Family album photographs serve as counterpoint to the tragedy. A social columnist, the Speaker, comments hypocritically upon... of a family photograph" (55). The suggestions are enticing for the director: dance-like movement in silence to create an oneiric effect, and the director uses them to rich and varied plastic effect. According to the magazine Isto , Antunes Filho...

George, David S.

1988-04-01T23:59:59.000Z

258

Todd A. Nelson  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2 andThe1A:decisional. 1 B O NAmesControlling themore

259

Ethanol Conversion on Cyclic (MO3)3 (M = Mo, W) Clusters  

SciTech Connect (OSTI)

Oxides of molybdenum and tungsten are an important class of catalytic materials with applications ranging from isomerization of alkanes and alkenes, partial oxidation of alcohols, selective reduction of nitric oxide and metathesis of alkeness.[1-10] While many studies have focused on the structure - function relationships, the nature of high catalytic activity is still being extensively investigated. There is a general agreement that the activity of supported MOx (M = W, Mo) catalysts is correlated with the presence of acidic sites, where the catalytic activity is strongly affected by the type of oxide support, delocalization of electron density, structures of tungsten oxide domains and presence of protons

Li, Zhenjun; Fang, Zongtang; Kelley, Matthew S.; Kay, Bruce D.; Rousseau, Roger J.; Dohnalek, Zdenek; Dixon, David A.

2014-03-06T23:59:59.000Z

260

Co-Mo Electric Cooperative- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

Co-Mo Electric Cooperative provides rebates to residential and commercial members who install air source, dual fuel, and/or geothermal heat pumps, and certain energy efficient appliances. The...

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Q value of the 100Mo Double-Beta Decay  

E-Print Network [OSTI]

Penning trap measurements using mixed beams of 100Mo - 100Ru and 76Ge - 76Se have been utilized to determine the double-beta decay Q-values of 100Mo and 76Ge with uncertainties less than 200 eV. The value for 76Ge, 2039.04(16) keV is in agreement with the published SMILETRAP value. The new value for 100Mo, 3034.40(17) keV is 30 times more precise than the previous literature value, sufficient for the ongoing neutrinoless double-beta decay searches in 100Mo. Moreover, the precise Q-value is used to calculate the phase-space integrals and the experimental nuclear matrix element of double-beta decay.

S. Rahaman; V. -V. Elomaa; T. Eronen; J. Hakala; A. Jokinen; J. Julin; A. Kankainen; A. Saastamoinen; J. Suhonen; C. Weber; J. yst

2007-12-20T23:59:59.000Z

262

9 Cr-- 1 Mo steel material for high temperature application  

DOE Patents [OSTI]

One or more embodiments relates to a high-temperature, titanium alloyed, 9 Cr-1 Mo steel exhibiting improved creep strength and oxidation resistance at service temperatures up to 650.degree. C. The 9 Cr-1 Mo steel has a tempered martensite microstructure and is comprised of both large (0.5-3 .mu.m) primary titanium carbides and small (5-50 nm) secondary titanium carbides in a ratio of. from about 1:1.5 to about 1.5:1. The 9 Cr-1 Mo steel may be fabricated using exemplary austenizing, rapid cooling, and tempering steps without subsequent hot working requirements. The 9 Cr-1 Mo steel exhibits improvements in total mass gain, yield strength, and time-to-rupture over ASTM P91 and ASTM P92 at the temperature and time conditions examined.

Jablonski, Paul D; Alman, David; Dogan, Omer; Holcomb, Gordon; Cowen, Christopher

2012-11-27T23:59:59.000Z

263

1 Mo 1 Do 1 Sa 1 Di 1 Fr 1 Fr 1 Mo 1 Mi 1 Sa 1 Mo 1 Do 1 So 2 Di 2 Fr 2 So 2 Mi 2 Sa 2 Sa 2 Di 2 Do 2 So 2 Di 2 Fr 2 Mo  

E-Print Network [OSTI]

1 Mo 1 Do 1 Sa 1 Di 1 Fr 1 Fr 1 Mo 1 Mi 1 Sa 1 Mo 1 Do 1 So 2 Di 2 Fr 2 So 2 Mi 2 Sa 2 Sa 2 Di 2 Do 2 So 2 Di 2 Fr 2 Mo 3 Mi 3 Sa 3 Mo 3 Do 3 So 3 So 3 Mi 3 Fr 3 Mo 3 Mi 3 Sa 3 Di 4 Do 4 So 4 Di 4 Fr 4 Mo 4 Mo 4 Do 4 Sa 4 Di 4 Do P StAU4 So 4 Mi 5 Fr 5 Mo 5 Mi 5 Sa 5 Di 5 Di 5 Fr 5 So 5 Mi 5 Fr 5 Mo

Mayberry, Marty

264

Timing and amount of crustal shortening, Shuanghe area, Central Tibet W.S.F. KIDD1, M.A. EDWARDS2, Y. LI1, K.D. NELSON3, L. RATSCHBACHER2, Z. WU4  

E-Print Network [OSTI]

, Y. LI1, K.D. NELSON3, L. RATSCHBACHER2, Z. WU4 1Earth & Atmospheric Sciences, University at Albany, Albany, NY 12222 USA. 2Institut für Geologie, Technische Universität Bergakadamie Freiberg, Freiberg, D-09596 Germany. 3Department of Geology, Syracuse University, Syracuse, New York, 13244 USA. 4Chinese

Kidd, William S. F.

265

Greg Nelson traveled to the Institute of Physics in Zagreb, Croatia, for a seven week period in the summer of 2005. His research plan was to measure the thermopower and resistivity at low  

E-Print Network [OSTI]

Greg Nelson traveled to the Institute of Physics in Zagreb, Croatia, for a seven week period corresponded to TaxN with x=.5, .6, .7, .8, 1. When in Croatia, he worked directly with Dr. Miroslav Ocko resistivity(triangles) and resistivity at 4.2 K(squares), with open symbols showing measurements from Croatia

Freericks, Jim

266

12 GeV CEBAF Upgrade Celebration to Be Held on Friday | Jefferson...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and the start of operations (aka Critical Decision 4A); and to recognize several vendors who provided distinguished contract performance during the upgrade effort. Virginia...

267

E-Print Network 3.0 - atlas tracker upgrade Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

research Summary: spectrometry. Future developments Since its inception in 1985, the ATLAS facility has continually been upgraded... ATLAS Argonne Tandem Linear Accelerator...

268

E-Print Network 3.0 - atlas strips upgrade Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

research Summary: spectrometry. Future developments Since its inception in 1985, the ATLAS facility has continually been upgraded... ATLAS Argonne Tandem Linear Accelerator...

269

E-Print Network 3.0 - atlas pixel upgrade Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

research Summary: spectrometry. Future developments Since its inception in 1985, the ATLAS facility has continually been upgraded... ATLAS Argonne Tandem Linear Accelerator...

270

Microsoft Word - CX-WallaWalla-Pendleton-Upgrade_FY14_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Line upgrade on Bonneville Power...

271

Microsoft Word - CX-DrainageUpgradesMultipleSubsFY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: FY13 Environmental Drainage Upgrades at Bonneville...

272

Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB...  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole...

273

Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

24, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at...

274

Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

January 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment...

275

E-Print Network 3.0 - asdex upgrade invited Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

200910 EURATOMCCFE Fusion Association Summary: will remain operational until at least 2014, and probably longer. ASDEX-Upgrade (Germany) was ranked second... and must know how...

276

Upgrading of western shale oil by hydropyrolysis and hydrotreating  

SciTech Connect (OSTI)

A proof-of-concept study for a new shale oil upgrading and refining process was undertaken. This project is aimed at reducing upgrading costs, thereby malting shale oil development more feasible for commercialization. Raw shale oil was topped to remove the most volatile components. The topped shale oil was distilled into three narrow boiling cuts, representing of 175--275{degrees}C, 275--365{degrees}C, and 365--455{degrees}C, and a residue portion (>455{degrees}C). The distillate cuts were used to study molecular weight effects, and the residue was used to test the performance of hydropyrolysis. Hydropyrolysis converts the heavy residue into lower boiling point materials which can be more easily hydrotreated. In the experiment to test molecular weight effects, it was found that geometric hindrance accounts for the inhibition effect. Diffusion limitation and inhibition by competitive adsorption are not strong effects. These results imply that there is no process substitute for the requirement of molecular weight reduction. In the experiment to test the performance of hydropyrolysis, average molecular weight is reduced from 495 to 359 at moderate severities. In HDN of the hydropyrolized residue, however, high process severities are still required to remove nitrogen to the level of refinery-acceptable-feed (< 0.15 wt %). Based on experimental data, the product slate is 1.9 wt % gas, 13.1 wt % gasoline, 27.3 wt % kerosene, 55.6 wt % total gas oil, 1.3 wt % vacuum residue, and 0.8 wt % coke with 1376 scf/bbl total hydrogen consumption. The removal of sulfur is 96%, and that of nitrogen is 84%. The concentration of sulfur in the final product is 0.038 wt %, and that of nitrogen in final product is 0.26%. The conversion of heavy residue to atmospheric distillate is 47%. However, the remaining residue is partially upgraded as a refinery feed.

Bunger, J.W.; Russell, C.P.; Jeong, Soon-Yong; Pu, J.

1992-07-01T23:59:59.000Z

277

Coated U(Mo) Fuel: As-Fabricated Microstructures  

SciTech Connect (OSTI)

As part of the development of low-enriched uranium fuels, fuel plates have recently been tested in the BR-2 reactor as part of the SELENIUM experiment. These fuel plates contained fuel particles with either Si or ZrN thin film coating (up to 1 m thickness) around the U-7Mo fuel particles. In order to best understand irradiation performance, it is important to determine the starting microstructure that can be observed in as-fabricated fuel plates. To this end, detailed microstructural characterization was performed on ZrN and Si-coated U-7Mo powder in samples taken from AA6061-clad fuel plates fabricated at 500C. Of interest was the condition of the thin film coatings after fabrication at a relatively high temperature. Both scanning electron microscopy and transmission electron microscopy were employed. The ZrN thin film coating was observed to consist of columns comprised of very fine ZrN grains. Relatively large amounts of porosity could be found in some areas of the thin film, along with an enrichment of oxygen around each of the the ZrN columns. In the case of the pure Si thin film coating sample, a (U,Mo,Al,Si) interaction layer was observed around the U-7Mo particles. Apparently, the Si reacted with the U-7Mo and Al matrix during fuel plate fabrication at 500C to form this layer. The microstructure of the formed layer is very similar to those that form in U-7Mo versus Al-Si alloy diffusion couples annealed at higher temperatures and as-fabricated U-7Mo dispersion fuel plates with Al-Si alloy matrix fabricated at 500C.

Emmanuel Perez; Dennis D. Keiser, Jr.; Ann Leenaers; Sven Van den Berghe; Tom Wiencek

2014-04-01T23:59:59.000Z

278

Energy Efficiency Upgrades for Little Rock Air Force Base  

SciTech Connect (OSTI)

Little Rock Air Force Base (LRAFB), in partnership with the local utility, Entergy Services, Inc., has reduced energy costs and used savings from investments in high-efficiency equipment to maintain and improve the condition of base housing and other facilities. Three projects were completed, with over $10 million invested. Major accomplishments include replacing air-to-air heat pumps with high-efficiency ground-source heat pumps (GSHPs) in more than 1,500 base housing units, lighting modifications to 10 buildings, upgrade of HVAC equipment in the base's enlisted club, and energy-efficient lighting retrofits for LRAFB's flight simulator.

Goldman, C.; Dunlap, M.A.

2000-11-13T23:59:59.000Z

279

Network Upgrade for the SLC: Control System Modifications  

SciTech Connect (OSTI)

Current communications between the SLAC Linear Collider control system central host and the SLCmicros is built upon the SLAC developed SLCNET communication hardware and protocols. We will describe how the Internet Suite of protocols (TCP/IP) are used to replace the SLCNET protocol interface. The major communication pathways and their individual requirements are described. A proxy server is used to reduce the number of total system TCP/IP connections. The SLCmicros were upgraded to use Ethernet and TCP/IP as well as SLCNET. Design choices and implementation experiences are addressed.

Crane, M.; Mackenzie, R.; Sass, R.; Himel, T.; /SLAC

2011-09-09T23:59:59.000Z

280

Physics at an upgraded proton driver at Fermilab  

SciTech Connect (OSTI)

The accelerator-based particle physics program in the US is entering a period of transition. This is particularly true at Fermilab which for more than two decades has been the home of the Tevatron Proton-Antiproton Collider, the World's highest energy hadron collider. In a few years time the energy frontier will move to the LHC at CERN. Hence, if an accelerator-based program is to survive at Fermilab, it must evolve. Fermilab is fortunate in that, in addition to hosting the Tevatron Collider, the laboratory also hosts the US accelerator-based neutrino program. The recent discovery that neutrino flavors oscillate has opened a new exciting world for us to explore, and has created an opportunity for the Fermilab accelerator complex to continue to address the cutting-edge questions of particle physics beyond the Tevatron Collider era. The presently foreseen neutrino oscillation experiments at Fermilab (MiniBooNE [1] and MINOS [2]) will enable the laboratory to begin contributing to the Global oscillation physics program in the near future, and will help us better understand the basic parameters describing the oscillations. However, this is only a first step. To be able to pin down all of the oscillation parameters, and hopefully make new discoveries along the way, we will need high statistics experiments, which will require a very intense neutrino beam, and one or more very massive detectors. In particular we will require new MW-scale primary proton beams and perhaps ultimately a Neutrino Factory [3]. Plans to upgrade the Fermilab Proton Driver are presently being developed [4]. The upgrade project would replace the Fermilab Booster with a new 8 GeV accelerator with 0.5-2 MW beam power, a factor of 15-60 more than the current Booster. It would also make the modifications needed to the Fermilab Main Injector (MI) to upgrade it to simultaneously provide 120 GeV beams of 2 MW. This would enable a factor of 5-10 increase in neutrino beam intensities at the MI, while also supporting a vigorous 8 GeV fixed-target program. In addition, a Proton Driver might also serve as a stepping-stone to future accelerators, both as an R&D test bed and as an injector, with connections to the Linear Collider, Neutrino Factories, and a VLHC. Hence, although neutrino physics would provide the main thrust for the science program at an upgraded Fermilab proton source, the new facility would also offer exciting opportunities for other fixed-target particle physics (kaons, muons, neutrons, antiprotons, etc.) and a path towards new accelerators in the future.

Steve Geer

2004-07-28T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Searches for Higgs Boson(s) at the Upgraded Tevatron  

E-Print Network [OSTI]

We summarize the status of Higgs boson searches at the upgraded Fermilab Tevatron performed by the DO and CDF collaborations. We report on three categories of searches, namely 1) the search for the Standard Model Higgs boson (p\\bar{p} --> H, WH or ZH, with H --> WW* and/or H --> b\\bar{b}), 2) the search for the minimal supersymmetric Higgs boson using p\\bar{p} --> hb\\bar{b} --> b\\bar{b}b\\bar{b} and p\\bar{p} --> hX --> tau tau X, 3) the search for doubly charged Higgs boson.

Gregorio Bernardi; for the CDF; D0 collaborations

2005-07-14T23:59:59.000Z

282

Energy Efficiency Upgrades Part of Winning Formula for Oregon School  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember 2011District | Department of Energy Upgrades

283

Energy Star Building Upgrade Value Calculator | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6 NoSan Leandro, California Zip: CA 94577Building Upgrade

284

UPGRADING RHIC FOR HIGHER LUMINOSITY* W. MacKay  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layeredof EnergyLeaseEnergyUNCLASSIFIED 2UPDATED:UPGRADING

285

UPGRADES WORK IN PHILADELPHIA'S HISTORIC BUILDINGS | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept. of Energy,UCOR Contract &on Energy and WaterUPGRADES

286

Upgrade Boilers with Energy-Efficient Burners | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept. ofUSA RSDepartment of Energy Updated Web ToolUpgrade

287

Jefferson Lab begins $310 million upgrade (Daily Press) | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJefferson Lab Click onLaserLabLabawards upgrade

288

PERFORMANCE OF AND UPGRADES TO THE SNS COLLIMATOR SYSTEMS  

SciTech Connect (OSTI)

As the Spallation Neutron Source (SNS) beam power is increased, the collimator systems are becoming correspondingly more important. The High Energy Beam Transport (HEBT) transverse collimators are now routinely used during neutron production. We are in the process of redesigning the HEBT momentum collimation system due to problems with gas production from radiolysis. The Ring collimators are designed for two-stage operation but to date they are mainly used in one-stage mode. In this paper we will discuss the status, the operational performance, and upgrades to the collimation systems.

Plum, Michael A [ORNL; Abdou, Ashraf A [ORNL; Jacobs, Lorelei L [ORNL; Janney, Jim G [ORNL; Geoghegan, Patrick J [ORNL; McTeer, Stephen Mark [ORNL; Popova, Irina [ORNL; Ferguson, Phillip D [ORNL; Zhukov, Alexander P [ORNL

2009-01-01T23:59:59.000Z

289

Analysis of NSTX Upgrade OH Magnet and Center Stack  

SciTech Connect (OSTI)

The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

A. Zolfaghari, P. Titus, J. Chrzanowski, A. Salehzadeh, F. Dahlgren

2010-11-30T23:59:59.000Z

290

Fischer-Tropsch wax characterization and upgrading: Final report  

SciTech Connect (OSTI)

The characterization and upgrading of Fischer-Tropsch wax was studied. The focus of the program was to maximize the yield of marketable transportation fuels from the Fischer-Tropsch process. The wax was characterized using gel permeation chromatography (GPC), high resolution mass spectrometry (HRMS), infrared spectroscopy (IR), gas chromatography (GC), nuclear magnetic resonance (NMR) and various other physical analyses. Hydrocracking studies conducted in a pilot plant indicate that Fischer-Tropsch wax is an excellent feedstock. A high yield of excellent quality diesel fuel was produced with satisfactory catalyst performance at relatively mild operating conditions. Correlations for predicting key diesel fuel properties were developed and checked against actual laboratory blend data. The blending study was incorporated into an economic evaluation. Finally, it is possible to take advantage of the high quality of the Fischer-Tropsch derived distillate by blending a lower value light cycle oil (produced from a refinery FCC unit) representing a high aromatic and low cetane number. The blended stream meets diesel pool specifications (up to 60 wt % LCO addition). The value added to this blending stream further enhances the upgrading complex return. 22 refs., 39 figs., 48 tabs.

Shah, P.P.; Sturtevant, G.C.; Gregor, J.H.; Humbach, M.J.; Padrta, F.G.; Steigleder, K.Z.

1988-06-06T23:59:59.000Z

291

Operation of the Upgraded ATLAS Level-1 Central Trigger System  

E-Print Network [OSTI]

The ATLAS Level-1 Central Trigger (L1CT) system is a central part of ATLAS data-taking and has undergone a major upgrade for Run 2 of the LHC, in order to cope with the expected increase of instantaneous luminosity of a factor of 2 with respect to Run 1. The upgraded hardware offers more flexibility in the trigger decisions due to the double amount of trigger inputs and usable trigger channels. It also provides an interface to the new topological trigger system. Operationally - particularly useful for commissioning, calibration and test runs - it allows concurrent running of up to 3 different sub-detector combinations. In this contribution, we give an overview of the operational software framework of the L1CT system with particular emphasis of the configuration, controls and monitoring aspects. The software framework allows a consistent configuration with respect to the ATLAS experiment and the LHC machine, upstream and downstream trigger processors, and the data acquisition. Trigger and dead-time rates are m...

Glatzer, Julian Maximilian Volker; The ATLAS collaboration

2015-01-01T23:59:59.000Z

292

ECE RADIOMETER UPGRADE ON THE DIII-D TOKAMAK  

SciTech Connect (OSTI)

OAK A271 ECE RADIOMETER UPGRADE ON THE DIII-D TOKAMAK. The electron cyclotron emission (ECE) heterodyne radiometer diagnostic on DIII-D has been upgraded with the addition of eight channels for a total of 40. The new, higher frequency channels allow measurements of electron temperature into the magnetic axis in discharges at maximum field, 2.15 T. The complete set now extends over the full usable range of second harmonic emission frequencies at 2.0 T covering radii from the outer edge inward to the location of third harmonic overlap on the high field side. Full coverage permits the measurement of heat pulses and magnetohydrodynamic (MHD) fluctuations on both sides of the magnetic axis. In addition, the symmetric measurements are used to fix the location of the magnetic axis in tokamak magnetic equilibrium reconstructions. Also, the new higher frequency channels have been used to determine central T{sub e} with good time resolution in low field, high density discharges using third harmonic ECE in the optically gray and optically thick regimes.

AUSTIN, ME; LOHR, J

2002-08-01T23:59:59.000Z

293

STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING  

SciTech Connect (OSTI)

CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

2012-07-01T23:59:59.000Z

294

RF Power Upgrade for CEBAF at Jefferson Laboratory  

SciTech Connect (OSTI)

Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

Andrew Kimber,Richard Nelson

2011-03-01T23:59:59.000Z

295

12 GeV Upgrade Project - Cryomodule Production  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

2012-07-01T23:59:59.000Z

296

Post Retort, Pre Hydro-treat Upgrading of Shale Oil  

SciTech Connect (OSTI)

Various oil feedstocks, including oil from oil shale, bitumen from tar sands, heavy oil, and refin- ery streams were reacted with the alkali metals lithium or sodium in the presence of hydrogen or methane at elevated temperature and pressure in a reactor. The products were liquids with sub- stantially reduced metals, sulfur and nitrogen content. The API gravity typically increased. Sodi- um was found to be more effective than lithium in effectiveness. The solids formed when sodium was utilized contained sodium sulfide which could be regenerated electrochemically back to so- dium and a sulfur product using a "Nasicon", sodium ion conducting membrane. In addition, the process was found to be effective reducing total acid number (TAN) to zero, dramatically reduc- ing the asphaltene content and vacuum residual fraction in the product liquid. The process has promise as a means of eliminating sulfur oxide and carbon monoxide emissions. The process al- so opens the possibility of eliminating the coking process from upgrading schemes and upgrad- ing without using hydrogen.

Gordon, John

2012-09-30T23:59:59.000Z

297

Production of Mo-99 using low-enriched uranium silicide  

SciTech Connect (OSTI)

Over the last several years, uranium silicide fuels have been under development as low-enriched uranium (LEU) targets for Mo-99. The use of LEU silicide is aimed at replacing the UAl{sub x} alloy in the highly-enriched uranium dissolution process. A process to recover Mo-99 from low-enriched uranium silicide is being developed at Argonne National Laboratory. The uranium silicide is dissolved in alkaline hydrogen peroxide. Experiments performed to determine the optimum dissolution procedure are discussed, and the results of dissolving a portion of a high-burnup (>40%) U{sub 3}Si{sub 2} miniplate are presented. Future work related to Mo-99 separation and waste disposal are also discussed.

Hutter, J. C.; Srinivasan, B.; Vicek, M.; Vandegrift, G. F.

1994-09-01T23:59:59.000Z

298

Multiphonon resonant Raman scattering in MoS{sub 2}  

SciTech Connect (OSTI)

Optical emission spectrum of a resonantly (??=?632.8?nm) excited molybdenum disulfide (MoS{sub 2}) is studied at liquid helium temperature. More than 20 peaks in the energy range spanning up to 1400?cm{sup ?1} from the laser line, which are related to multiphonon resonant Raman scattering processes, are observed. The attribution of the observed lines involving basic lattice vibrational modes of MoS{sub 2} and both the longitudinal (LA(M)) and the transverse (TA(M) and/or ZA(M)) acoustic phonons from the vicinity of the high-symmetry M point of the MoS{sub 2} Brillouin zone is proposed.

Go?asa, K., E-mail: Katarzyna.Golasa@fuw.edu.pl; Grzeszczyk, M.; Wysmo?ek, A.; Babi?ski, A. [Faculty of Physics, University of Warsaw, ul. Ho?a 69, 00-681 Warszawa (Poland); Leszczy?ski, P.; Faugeras, C.; Nicolet, A. A. L.; Potemski, M. [Laboratoire National des Champs Magntiques Intenses, CNRS-UJF-UPS-INSA, 25, avenue des Martyrs, 38042 Grenoble (France)

2014-03-03T23:59:59.000Z

299

Identification of phases in the interaction layer between U-Mo-Zr/Al and U-Mo-Zr/Al-Si  

SciTech Connect (OSTI)

Out-of-pile diffusion experiments were performed between U-7wt.% Mo-1wt.% Zr and Al or Al A356 (7,1wt.% Si) at 550 deg. C. In this work morphological characterization and phase identification on both interaction layer are presented. They were carried out by the use of different techniques: optical and scanning electron microscopy, X-Ray diffraction and WDS microanalysis. In the interaction layer U-7wt.% Mo-1wt.% Zr/Al, the phases UAl{sub 3}, UAl{sub 4}, Al{sub 20}Mo{sub 2}U and Al{sub 43}Mo{sub 4}U{sub 6} were identified. In the interaction layer U-7wt.% Mo-1wt.% Zr/Al A356, the phases U(Al, Si) with 25at.% Si and Si{sub 5}U{sub 3} were identified. This last phase, with a higher Si concentration, was identified with XRD Synchrotron radiation performed at the National Synchrotron Light Laboratory (LNLS), Campinas, Brasil. (author)

Varela, C.L. Komar; Arico, S.F.; Mirandou, M.; Balart, S.N. [Departamento Materiales, GIDAT, GAEN, CNEA, Avda. Gral Paz 1499, B1650KNA, San Martin (Argentina); Gribaudo, L.M. [Departamento Materiales, GIDAT, GAEN, CNEA, Avda. Gral Paz 1499, B1650KNA, San Martin (Argentina); CONICET, Avda. Rivadavia 1917, C1033AAJ, Buenos Aires (Argentina)

2008-07-15T23:59:59.000Z

300

Hydrotreatment of Athabasca bitumen derived gas oil over Ni-Mo, Ni-W, and Co-Mo catalysts  

SciTech Connect (OSTI)

The hydrotreatment of Athabasca bitumen derived heavy gas oil containing 4.08% S and 0.49% N was carried out in a trickle bed reactor over Ni-W, Ni-Mo, and Co-Mo catalysts supported on zeolite-alumina-silica at 623-698 K, LHSV of 1-4, gas flow rate 890 m[sup 3][sub H2]/m[sup 3][sub oil] (5,000 sef/bbl), and pressure of 6.89 MPa. Analyses for viscosity, density, aniline point, ASTM mid boiling point distillation, C/H ratio, and percentage of N and S in the final product were carried out to characterize the product oil. The amounts of N and S removed indicated the hydrodenitrogenation and hydrodesulfurization activity of the catalysts. Results of zeolite-alumina-silica-supported catalysts are compared to those obtained with commercially available Ni-Mo, Ni-W, and Co-Mo on [gamma]-alumina. Ni-Mo supported on zeolite-alumina-silica was most active and could remove as much as 99 % S and 89% N present in the oil at 698 K. The data for HDN and HDS fitted the pseudo first order model. The kinetic model is described in detail.

Diaz-Real, R.A.; Mann, R.S.; Sambi, I.S. (Univ. of Ottawa, Ontario (Canada). Dept. of Chemical Engineering)

1993-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion  

E-Print Network [OSTI]

UPGRADING AND ENHANCED RECOVERY OF JOBO HEAVY OIL USING HYDROGEN DONOR UNDER IN-SITU COMBUSTION A... UPGRADING AND ENHANCED RECOVERY OF JOBO HEAVY OIL USING HYDROGEN DONOR UNDER IN-SITU COMBUSTION A Thesis by SAMIR HUSEYNZADE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements...

Huseynzade, Samir

2008-10-10T23:59:59.000Z

302

Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion  

E-Print Network [OSTI]

In-situ upgrading of oil using hydrogen donors is a new process. In particular, very little research has been conducted with respect to in-situ oil upgrading using hydrogen donor under in-situ combustion. Several papers describe the use of metal...

Huseynzade, Samir

2009-05-15T23:59:59.000Z

303

Gate Reliability Assessment for a Spillway Upgrade Design in Queensland, Australia USSD 2006 Conference Page 1  

E-Print Network [OSTI]

Gate Reliability Assessment for a Spillway Upgrade Design in Queensland, Australia USSD 2006 Conference Page 1 RELIABILITY ASSESSMENT FOR A SPILLWAY GATE UPGRADE DESIGN IN QUEENSLAND, AUSTRALIA Malcolm of reliability analysis, and how the results influenced the spillway system design and overall risk evaluation

Bowles, David S.

304

An e-Learning Platform for SME Manager Upgrade and its Evolution Toward a Distributed  

E-Print Network [OSTI]

An e-Learning Platform for SME Manager Upgrade and its Evolution Toward a Distributed Training and the evaluation of an innovative e-learning platform for manager upgrade in Small and Medium Enterprises (SME but it is more and more true for Small and Medium Enterprises (SME) that often don't have a well defined

Paris-Sud XI, Université de

305

Sponsored by: National Association of Energy Service Companies Financing An Energy Upgrade  

E-Print Network [OSTI]

, as companies found it cost effective to invest in new technology that used less energy. 1 of 8 1/10/2001 11 and financiers' increasing comfort level with energy upgrade initiatives means good news: It's easier to accessSponsored by: National Association of Energy Service Companies Financing An Energy Upgrade

306

DEVELOPMENT AND TESTING OF A PROTOTYPE TUNER FOR THE CEBAF UPGRADE CRYOMODULE*  

E-Print Network [OSTI]

DEVELOPMENT AND TESTING OF A PROTOTYPE TUNER FOR THE CEBAF UPGRADE CRYOMODULE* G. Davis , J developed for CEBAF at Jefferson Lab. The high-gradient, low-current operation of the superconductingHz and resolution of 1Hz that will be used during normal operation [1]. Fig. 1: CEBAF Upgrade Tuner 2 MECHANICAL

307

CRYOGENIC TESTING OF THE RF INPUT WAVEGUIDE FOR THE CEBAF UPGRADE CRYOMODULE*  

E-Print Network [OSTI]

CRYOGENIC TESTING OF THE RF INPUT WAVEGUIDE FOR THE CEBAF UPGRADE CRYOMODULE* T. Hiatt , M. Breth to support the planned CEBAF upgrade at the Jefferson Lab a new cryomodule has been designed. A key component original CEBAF waveguides. A series of tests were performed on the waveguide to include temperature

308

CEBAF UPGRADE CRYOMODULE COMPONENT TESTING IN THE HORIZONTAL TEST BED (HTB)*  

E-Print Network [OSTI]

CEBAF UPGRADE CRYOMODULE COMPONENT TESTING IN THE HORIZONTAL TEST BED (HTB)* I. E. Campisi , B The planned upgrade of the CEBAF electron accelerator includes the development of an improved cryomodule. Several components differ substantially from the original CEBAF cryomodule; these include: the new 7-cell

309

Status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostic system  

SciTech Connect (OSTI)

This paper presents the current status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostics system. For the initial instruments active on TMX-U, the expansions or upgrades that have been implemented are outlined. For the newly added systems, more implementation details are presented.

Coutts, G.W.; Coffield, F.E.; Hornady, R.S.

1983-11-26T23:59:59.000Z

310

Theoretical Description of Heavy Impurity Transport and its Application to the Modelling of Tungsten in JET and ASDEX Upgrade  

E-Print Network [OSTI]

Theoretical Description of Heavy Impurity Transport and its Application to the Modelling of Tungsten in JET and ASDEX Upgrade

311

Proposal concerning the participation of CERN in the procurement of depleted-uranium sheets for the UA1 calorimeter upgrading  

E-Print Network [OSTI]

Proposal concerning the participation of CERN in the procurement of depleted-uranium sheets for the UA1 calorimeter upgrading

1985-01-01T23:59:59.000Z

312

Proposal to negotiate two contracts, without competitive tendering, for the supply and upgrade of cooling water pumps for the LHC  

E-Print Network [OSTI]

Proposal to negotiate two contracts, without competitive tendering, for the supply and upgrade of cooling water pumps for the LHC

2012-01-01T23:59:59.000Z

313

Network Upgrade for the SLC: PEP II Network  

SciTech Connect (OSTI)

The PEP-II control system required a new network to support the system functions. This network, called CTLnet, is an FDDI/Ethernet based network using only TCP/IP protocols. An upgrade of the SLC Control System micro communications to use TCP/IP and SLCNET would allow all PEP-II control system nodes to use TCP/IP. CTLnet is private and separate from the SLAC public network. Access to nodes and control system functions is provided by multi-homed application servers with connections to both the private CTLnet and the SLAC public network. Monitoring and diagnostics are provided using a dedicated system. Future plans and current status information is included.

Crane, M.; Call, M.; Clark, S.; Coffman, F.; Himel, T.; Lahey, T.; Miller, E.; Sass, R.; /SLAC

2011-09-09T23:59:59.000Z

314

Raytheon: Compressed Air System Upgrade Saves Energy and Improves Performance  

SciTech Connect (OSTI)

In 2003, Raytheon Company upgraded the efficiency of the compressed air system at its Integrated Air Defense Center in Andover, Massachusetts, to save energy and reduce costs. Worn compressors and dryers were replaced, a more sophisticated control strategy was installed, and an aggressive leak detection and repair effort was carried out. The total cost of these improvements was $342,000; however, National Grid, a utility service provider, contributed a $174,000 incentive payment. Total annual energy and maintenance cost savings are estimated at $141,500, and energy savings are nearly 1.6 million kWh. This case study was prepared for the U.S. Department of Energy's Industrial Technologies Program.

Not Available

2005-04-01T23:59:59.000Z

315

Pressure Safety of JLAB 12GeV Upgrade Cryomodule  

SciTech Connect (OSTI)

This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Final Rule [1], which are being implemented during construction of the 100 Megavolt Cryomodule (C100 CM) for Jefferson Labs 12 GeV Upgrade Project. The C100 CM contains several essential subsystems that require pressure safety measures: piping in the supply and return end cans, piping in the thermal shield and the helium headers, the helium vessel assembly which includes high RRR niobium cavities, the end cans, and the vacuum vessel. Due to the vessel sizes and pressure ranges, applicable national consensus code rules are applied. When national consensus codes are not applicable, equivalent design and fabrication approaches are identified and implemented. Considerations for design, material qualification, fabrication, inspection and examination are summarized. In addition, JLABs methodologies for implementation of the 10 CFR 851 requirements are described.

Cheng, Gary [JLAB; Wiseman, Mark A. [JLAB; Daly, Ed [JLAB

2009-11-01T23:59:59.000Z

316

Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade  

SciTech Connect (OSTI)

The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

Josh A. Salmond

2009-08-07T23:59:59.000Z

317

Upgrade of the cryogenic CERN RF test facility  

SciTech Connect (OSTI)

With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B. [CERN - European Organization for Nuclear Research, CH-1211 Geneva 23 (Switzerland); Koettig, T. [ESS - European Spallation Source, Box 176, 221 00 Lund (Sweden)

2014-01-29T23:59:59.000Z

318

Planar Pixel Sensors for the ATLAS Upgrade: Beam Tests results  

E-Print Network [OSTI]

Results of beam tests with planar silicon pixel sensors aimed towards the ATLAS Insertable B-Layer and High Luminosity LHC (HL-LHC) upgrades are presented. Measurements include spatial resolution, charge collection performance and charge sharing between neighbouring cells as a function of track incidence angle for different bulk materials. Measurements of n-in-n pixel sensors are presented as a function of fluence for different irradiations. Furthermore p-type silicon sensors from several vendors with slightly differing layouts were tested. All tested sensors were connected by bump-bonding to the ATLAS Pixel read-out chip. We show that both n-type and p-type tested planar sensors are able to collect significant charge even after integrated fluences expected at HL-LHC.

J. Weingarten; S. Altenheiner; M. Beimforde; M. Benoit; M. Bomben; G. Calderini; C. Gallrapp; M. George; S. Gibson; S. Grinstein; Z. Janoska; J. Jentzsch; O. Jinnouchi; T. Kishida; A. La Rosa; V. Libov; A. Macchiolo; G. Marchiori; D. Mnstermann; R. Nagai; G. Piacquadio; B. Ristic; I. Rubinskiy; A. Rummler; Y. Takubo; G. Troska; S. Tsiskaridtze; I. Tsurin; Y. Unno; P. Weigell; T. Wittig

2012-11-09T23:59:59.000Z

319

Reaction sequence of metallopetroporphyrins during heavy residuum upgrading  

SciTech Connect (OSTI)

The authors analyzed the metallopetroporphyrins and the metallo-nonporphyrins during thermal and catalytic upgrading of heavy residua. By size exclusion chromatography with element specific detection (SEC-HPLC-ICP), they found thermal treatment reduces the size of the remaining metal-containing compounds, while catalytic treatment preferentially removes the metal-containing molecules in the size range of the catalyst pore. In both cases the metallopetroporphyrins process easily. By applying column chromatography and UV-vis spectroscopy, we have been able to detect and quantitate some of the probable intermediates of the demetallation sequence for vanadyl petroporphyrins. These results show the demetallation pathway is probably through the reduction of the porphyrins to chlorins and other reduced species. These results are in agreement with metalloporphyrin model compound work seen in the literature.

Reynolds, J.G.; Biggs, W.R.; Bezman, S.A.

1986-04-01T23:59:59.000Z

320

Digital upgrade issues and the evolving regulatory environment  

SciTech Connect (OSTI)

This paper deals with the qualification of an Instrumentation and Control (I and C) upgrade for Electromagnetic Compatibility (EMC) in the plant, focusing on the interpretation of the NRC Regulatory Guide 1.180 Revision 1, 'Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems.' Options presented by Reg. Guide 1.180 are discussed along with alternative EMC Guidelines being used by nuclear power plants. Problems commonly encountered during the EMC qualification process are discussed and suggestions presented on how to deal with these common problems. Also included is a discussion of an emerging issue of how to address the issue of EMC of replacement discrete modules or printer circuit (PC) boards in a system that was either previously qualified or never qualified for EMC. (authors)

Meininger, R. D. [CHAR Services, Inc., 400 E. Main St., Annville, PA 17003 (United States)

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Integrated EM & Thermal Simulations with Upgraded VORPAL Software  

SciTech Connect (OSTI)

Nuclear physics accelerators are powered by microwaves which must travel in waveguides between room-temperature sources and the cryogenic accelerator structures. The ohmic heat load from the microwaves is affected by the temperature-dependent surface resistance and in turn affects the cryogenic thermal conduction problem. Integrated EM & thermal analysis of this difficult non-linear problem is now possible with the VORPAL finite-difference time-domain simulation tool. We highlight thermal benchmarking work with a complex HOM feed-through geometry, done in collaboration with researchers at the Thomas Jefferson National Accelerator Laboratory, and discuss upcoming design studies with this emerging tool. This work is part of an effort to generalize the VORPAL framework to include generalized PDE capabilities, for wider multi-physics capabilities in the accelerator, vacuum electronics, plasma processing and fusion R&D fields, and we will also discuss user interface and algorithmic upgrades which facilitate this emerging multiphysics capability.

D.N. Smithe, D. Karipides, P. Stoltz, G. Cheng, H. Wang

2011-03-01T23:59:59.000Z

322

NEUTRON RADIOGRAPHY (NRAD) REACTOR 64-ELEMENT CORE UPGRADE  

SciTech Connect (OSTI)

The neutron radiography (NRAD) reactor is a 250 kW TRIGA (registered) (Training, Research, Isotopes, General Atomics) Mark II , tank-type research reactor currently located in the basement, below the main hot cell, of the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL). It is equipped with two beam tubes with separate radiography stations for the performance of neutron radiography irradiation on small test components. The interim critical configuration developed during the core upgrade, which contains only 62 fuel elements, has been evaluated as an acceptable benchmark experiment. The final 64-fuel-element operational core configuration of the NRAD LEU TRIGA reactor has also been evaluated as an acceptable benchmark experiment. Calculated eigenvalues differ significantly (approximately +/-1%) from the benchmark eigenvalue and have demonstrated sensitivity to the thermal scattering treatment of hydrogen in the U-Er-Zr-H fuel.

John D. Bess

2014-03-01T23:59:59.000Z

323

THE SNS VACUUM CONTROL SYSTEM UPGRADE FOR THE SUPERCONDUCTING LINAC  

SciTech Connect (OSTI)

The superconducting linac of the Spallation Neutron Source (SNS) has 23 cryomodules whose vacuum system is monitored and controlled by custom built hardware. The original control hardware was provided by Thomas Jefferson National Accelerator Facility (JLab) and contained a variety of custom boards utilizing integrated circuits to perform logic. The need for control logic changes, a desire to increase maintainability, and a desire to increase flexibility to adapt for the future has led to a Programmable Logic Controller (PLC) based upgrade. This paper provides an overview of the commercial off-the-shelf (COTS) hardware being used in the superconducting vacuum control system. Details of the design and challenges to convert a control system during small windows of maintenance periods without disrupting beam operation will be covered in this paper.

Williams, Derrick C [ORNL] [ORNL

2009-01-01T23:59:59.000Z

324

Beam Loss Ion Chamber System Upgrade for Experimental Halls  

SciTech Connect (OSTI)

The Beam loss Ion Chamber System (BLICS) was developed to protect Jefferson Labs transport lines, targets and beam dumps from a catastrophic ''burn through''. Range changes and testing was accomplished manually requiring the experiment to be shut down. The new upgraded system is based around an ''off the shelf'' Programmable Logic Controller located in a single control box supporting up to ten individual detectors. All functions that formerly required an entry into the experimental hall and manual adjustment can be accomplished from the Machine Control Center (MCC). A further innovation was the addition of a High Voltage ''Brick'' at the detector location. A single cable supplies the required voltage for the Brick and a return line for the ion chamber signal. The read back screens display range, trip point, and accumulated dose for each location. The new system is very cost effective and significantly reduces the amount of lost experimental time.

D.W. Dotson; D.J. Seidman

2005-05-16T23:59:59.000Z

325

Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS...  

Broader source: Energy.gov (indexed) [DOE]

1 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash - AL...

326

Nanoscale Phase Separation In Epitaxial Cr-Mo and Cr-V Alloy...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Separation In Epitaxial Cr-Mo and Cr-V Alloy Thin Films Studied Using Atom Probe Tomography: Comparison Of Nanoscale Phase Separation In Epitaxial Cr-Mo and Cr-V Alloy Thin Films...

327

MO"BIUS-INVARIANT KNOT ENERGIES R.B. KUSNER  

E-Print Network [OSTI]

for divergence-free vector fields which arise in modeling incompressible fluid flow.6,7These new knot energies MO"BIUS-INVARIANT KNOT ENERGIES R.B. KUSNER, Urbana, IL, USA 61801-2975 There has been recent interest in knot energies among mathematicians

Sullivan, John M.

328

MO"BIUS-INVARIANT KNOT ENERGIES R.B. KUSNER  

E-Print Network [OSTI]

for divergence-free vector fields which arise in modeling incompressible fluid flow.? These new knot energies may MO"BIUS-INVARIANT KNOT ENERGIES R.B. KUSNER, Urbana, IL, USA 61801-2975 There has been recent interest in knot energies among mathematicians

329

Phase transitions in the adsorption system Li/Mo(112)  

E-Print Network [OSTI]

Experimental studies of the phase transitions in the adsorption system Li/Mo(112) are presented. This system is a model system for highly anisotropic interactions. From measurements of the half-widths of the low-energy electron diffraction spot...

Fedorus, A.; Kolthoff, D.; Koval, V.; Lyuksyutov, Igor F.; Naumovets, AG; Pfnur, H.

2000-01-01T23:59:59.000Z

330

Influence of Mo on the Fe:Mo:C nanocatalyst thermodynamics for single-walled carbon nanotube growth  

E-Print Network [OSTI]

ternary phases, such as the Fe,Mo 23C6 type carbides.37 The way in which carbon interacts with transition of metal carbide formation. Although relating C solubility and catalytic ability of metal catalysts,23 , metals which form carbides ca

Curtarolo, Stefano

331

Phonon and elastic instabilities in MoC and MoN Gus L. W. Hart* and Barry M. Klein  

E-Print Network [OSTI]

illustrating the rich behavior of carbo-nitride materials. The early transition metal carbides and nitrides high transition temperatures. We show that the elastic instability in B1-structure MoN, demonstrated the calculations re- ported here were performed with the linear-augmented- plane-wave method.2­4 The B1 carbides

Hart, Gus

332

PHOTOINJECTED ENERGY RECOVERY LINAC UPGRADE FOR THE NATIONAL SYNCHROTRON LIGHT SOURCE.  

SciTech Connect (OSTI)

We describe a major paradigm shift in the approach to the production of synchrotron radiation This change will considerably improve the scientific capabilities of synchrotron light sources. We introduce plans for an upgrade of the National Synchrotron Light Source (NSLS). This upgrade will be based on the Photoinjected Energy Recovering Linac (PERL). This machine emerges from the union of two technologies, the laser-photocathode RF gun (photoinjector) and superconducting linear accelerators with beam energy recovery (Energy Recovering Linac). The upgrade will bring the NSLS users many new insertion device beam lines, brightness greater than 3rd generation lightsource's and ultra-short pulse capabilities, not possible with storage ring light sources.

BEN-ZVI,I.; BABZIEN,M.; BLUM,E.; CASEY,W.; CHANG,X.; GRAVES,W.; HASTINGS,J.; HULBERT,S.; JOHNSON,E.; KAO,C.C.; KRAMER,S.; KRINSKY,S.; MORTAZAVI,P.; MURPHY,J.; OZAKI,S.; PJEROV,S.; PODOBEDOV,B.; RAKOWSKY,G.; ROSE,J.; SHAFTAN,T.; SHEEHY,B.; SIDDONS,D.; SMEDLEY,J.; SRINIVASAN-RAO,T.; TOWNE,N.; WANG,J.M.; WANG,X.; WU,J.; YAKIMENKO,V.; YU,L.H.

2001-06-18T23:59:59.000Z

333

Conceptual design of a 2 tesla superconducting solenoid for the Fermilab D{O} detector upgrade  

SciTech Connect (OSTI)

This paper presents a conceptual design of a superconducting solenoid to be part of a proposed upgrade for the D0 detector. This detector was completed in 1992, and has been taking data since then. The Fermilab Tevatron had scheduled a series of luminosity enhancements prior to the startup of this detector. In response to this accelerator upgrade, efforts have been underway to design upgrades for D0 to take advantage of the new luminosity, and improvements in detector technology. This magnet is conceived as part of the new central tracking system for D0, providing a radiation-hard high-precision magnetic tracking system with excellent electron identification.

Brzezniak, J.; Fast, R.W.; Krempetz, K.

1994-05-01T23:59:59.000Z

334

Upgrade of the D0 detector: The Tevatron beyond 2 fb**(-1)  

SciTech Connect (OSTI)

Recent performance of Fermilab's Tevatron has exceeded this year's design goals and further accelerator upgrades are underway. The high-luminosity period which follows these improvements is known as Run IIb. The D0 experiment is in the midst of a comprehensive upgrade program designed to enable it to thrive with much higher data rate and occupancy. Extensive modifications of and additions to all levels of the trigger and the silicon tracker are in progress. All upgrade projects are on schedule for installation in the 2005 shutdown.

Quinn, Breese; /Mississippi U.

2005-01-01T23:59:59.000Z

335

Scintillating bolometers based on ZnMoO$_4$ and Zn$^{100}$MoO$_4$ crystals to search for 0$\  

E-Print Network [OSTI]

The technology of scintillating bolometers based on zinc molybdate (ZnMoO$_4$) crystals is under development within the LUMINEU project to search for 0$\

Poda, D V; Arnaud, Q; Augier, C; Benot, A; Berg, L; Boiko, R S; Bergmann, T; Blmer, J; Broniatowski, A; Brudanin, V; Camus, P; Cazes, A; Censier, B; Chapellier, M; Charlieux, F; Chernyak, D M; Coron, N; Coulter, P; Cox, G A; Danevich, F A; de Boissire, T; Decourt, R; De Jesus, M; Devoyon, L; Drillien, A -A; Dumoulin, L; Eitel, K; Enss, C; Filosofov, D; Fleischmann, A; Fourches, N; Gascon, J; Gastaldo, L; Gerbier, G; Giuliani, A; Gros, M; Hehn, L; Henry, S; Herv, S; Heuermann, G; Humbert, V; Ivanov, I M; Juillard, A; Kflian, C; Kleifges, M; Kluck, H; Kobychev, V V; Koskas, F; Kozlov, V; Kraus, H; Kudryavtsev, V A; Sueur, H Le; Loidl, M; Magnier, P; Makarov, E P; Mancuso, M; de Marcillac, P; Marnieros, S; Marrache-Kikuchi, C; Menshikov, A; Nasonov, S G; Navick, X-F; Nones, C; Olivieri, E; Pari, P; Paul, B; Penichot, Y; Pessina, G; Piro, M C; Plantevin, O; Redon, T; Robinson, M; Rodrigues, M; Rozov, S; Sanglard, V; Schmidt, B; Shlegel, V N; Siebenborn, B; Strazzer, O; Tcherniakhovski, D; Tenconi, M; Torres, L; Tretyak, V I; Vagneron, L; Vasiliev, Ya V; Velazquez, M; Viraphong, O; Walker, R J; Weber, M; Yakushev, E; Zhang, X; Zhdankov, V N

2015-01-01T23:59:59.000Z

336

The CEBAF II/ELIC Upgrade of CEBAF  

SciTech Connect (OSTI)

A strong physics case has been established for constructing an extremely high luminosity ({approx} 10{sup 38} cm{sup -2} sec{sup -1}), CEBAF-like accelerator with energies in the 20-30 GeV range. There have also been a series of studies investigating the scientific potential of an electron-light ion collider (ELIC) operating in the 20-65 GeV center-of-mass energy range. The facility at Jefferson Lab can be upgraded to provide either (or both) of these options in a straightforward manner. An energy upgrade of CEBAF to 25 GeV would support extensions of the CEBAF 12 GeV program to smaller x and higher Q{sup 2}, and, in particular, support a program of deeply virtual meson production that would permit the flavor separation of the Generalized Parton Distributions that characterize the nucleon's properties. A high-luminosity electron light ion collider (ELIC) in the center-of-mass energy range {radical}s of 20-65 GeV, would build on the physics insights obtained from the CEBAF 12 GeV upgrade, and expand on our understanding of the structure of the nucleon and nuclear binding. While questions remain on the details of the science program and on technical aspects of the facility design, we expect that the facility's research program will be absolutely central to the field of nuclear physics. In particular, such a facility will provide a unique tool to: (1) Complete our quantitative understanding of how quarks and gluons provide the binding and the spin of the nucleon; (2) Understand how quarks and gluons evolve into hadrons via the dynamics of confinement; and (3) Refine our understanding of how the nuclear binding arises from QCD. The April 2002 Long-Range Plan for the Next Decade, developed by the 2001-2002 Nuclear Sciences Advisory Committee (NSAC) Long Range Planning Process, noted that a 'ring-linac option where a linear electron beam is incident on a stored ion beam' is one of two classes of machine design for an electron-ion collider (the other is a ring-ring design). Since then, conceptual design studies for the facility have continued, and our latest results indicate that luminosities of up to 10{sup 35} cm{sup -2} sec{sup -1} are within reach, with a combination of a high-intensity, energy-recovered linac and a ring that has been optimized for this physics. A number of technical challenges remain, and several R&D projects have been started. These include: electron cooling of protons/ions (in collaboration with BNL/BINP); the design of an interaction region and detector that, taken together, support the combination of the very high luminosity and very high detector acceptance and resolution essential to carry out this physics program; and the demonstration of the feasibility of energy recovery at high current and high energy. For the latter, an early test on the GeV scale will occur at JLab in March, 2003. Given the level of R&D remaining to be done, the readiness of this project should be categorized as 'scientific and engineering issues still need to be resolved'.

Jefferson Lab

2003-04-01T23:59:59.000Z

337

Transcript of April 11, 2013, TAP webinar titled Financing Energy Upgrades for K-12 School Districts  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

338

All that glitters is not gold : unexpected lessons from a slum upgrading program in Brazil  

E-Print Network [OSTI]

This paper looks at the Ribeira Azul Slum Upgrading Program in Salvador de Bahia Brazil, implemented by the development agency of the state of Bahia, CONDER, and the Italian NGO Associazione Volontari per il Servizio ...

Zuin, Valentina

2005-01-01T23:59:59.000Z

339

E-Print Network 3.0 - atlas slhc upgrade Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: atlas slhc upgrade Page: << < 1 2 3 4 5 > >> 1 Joint ATLASCMS SLHC Opto WG 1 March 5, 2010...

340

EA-1247: Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposal to upgrade the electrical power supply system for the U.S. Department of Energy Los Alamos National Laboratory to increase the...

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The...

342

Q&A: Financing Energy Efficiency Upgrades for Your Home through...  

Broader source: Energy.gov (indexed) [DOE]

Return to Map PowerSaver Lenders FHA Home Energy Financing Select a state to see qualified lenders. Alaska Hawaii Alaska Powersaver Energy Upgrade Loan-Up to 7,500 This type of...

343

Microsoft PowerPoint - 03a_PDCI-Upgrade_final_KAM [Compatibility...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

O N CELILO TERMINAL UPGRADE NEPA - CX for all terminal activities completed June 2013. HVDC Supplier contract was awarded to ABB December 2012 for 260M. ABB is world leader in...

344

Automation of airlift scheduling for the upgraded command and control system of military airlift command  

E-Print Network [OSTI]

This report describes a conceptual design for automation of the scheduling of airlift activities as part of the current upgrade of the MAC C2 System. It defines the airlift scheduling problem in generic terms before reviewing ...

Simpson, R. W.

1984-01-01T23:59:59.000Z

345

AN E&E PUBLISHING SERVICE ENERGY EFFICIENCY: Tenn. project to test range of residential upgrades  

E-Print Network [OSTI]

AN E&E PUBLISHING SERVICE ENERGY EFFICIENCY: Tenn. project to test range of residential upgrades has done on common residential construction near the Oak Ridge lab. In one such project, Christian

346

Participation as an end versus a means : understanding a recurring dilemma in urban upgrading  

E-Print Network [OSTI]

Since the 1920s, participatory approaches to urban upgrading in developing nations have demonstrated that involving the urban poor in the physical, social, and economic development of their settlements could improve their ...

Fallavier, Pierre

2007-01-01T23:59:59.000Z

347

Assessing the Effects of a Program to Promote Energy-Efficiency Upgrades in Existing Homes  

E-Print Network [OSTI]

Energy efficient mortgages (EEMs) are intended to mitigate some of the financial barriers to upgrading the energy efficiency of existing (and sometimes new) houses. The Time of Sale Energy Renovation Program (TOSER) is designed to overcome key...

Lee, A.; Larkin, J.; Gobris, M. K.; Boughen, S.; Staples, J.

2002-01-01T23:59:59.000Z

348

Changes in measured lightning return stroke peak current after the 1994 National Lightning Detection Network upgrade  

E-Print Network [OSTI]

Since a comprehensive upgrade of the US National Lightning Detection Network (NLDN) in 1994, the mean peak current of detected cloud-to-ground (CG) lightning flashes has decreased, the number of detected flashes has increased, and the percentage...

Wacker, Robert Scott

1997-01-01T23:59:59.000Z

349

CEBAF energy upgrade program including re-work of CEBAF cavities  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility, Jefferson Lab, is planning an upgrade of the CEBAF accelerator from a maximum energy of 6 GeV to 12 GeV and from 3 to 4 experimental halls. This paper will discuss the plans for upgrading the energy of the machine which requires improvements of the existing Super Conducting Radio Frequency (SRF) cryomodules and the additions of ten newly designed high performance SRF cryomodules.

Joseph Preble

2008-02-12T23:59:59.000Z

350

Recent results of the ATLAS Upgrade Planar Pixel Sensors R&D Project  

E-Print Network [OSTI]

The ATLAS detector has to undergo significant updates at the end of the current decade, in order to withstand the increased occupancy and radiation damage that will be produced by the high-luminosity upgrade of the Large Hadron Collider. In this presentation we give an overview of the recent accomplishments of the R&D activity on the planar pixel sensors for the ATLAS Inner Detector upgrade.

Giovanni Marchiori; for the ATLAS Upgrade PPS Collaboration

2012-01-27T23:59:59.000Z

351

Investment-Grade Compressed Air System Audit, Analysis, and Upgrade in a Pulp and Paper Mill  

E-Print Network [OSTI]

INVESTMENT-GRADE COMPRESSED AIR SYSTEM AUDIT, ANALYSIS, AND UPGRADE IN A PULP & PAPER MILL Paresh S. Parekh, P.E. Principal ABSTRACT An investment-grade compressed air audit, analysis, design, and upgrade in an industrial facility requires a..., West Tacoma Division, located in Washington State, had production capability of 540 tons per day of recycle newsprint manufactured from TMP and recycled paper. Over the years, as mill capacity increased, various sizes and types of air compressor...

Parekh, P. S.

352

High Resolution BPM Upgrade for the ATF Damping Ring at KEK  

E-Print Network [OSTI]

A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented.

Eddy, N; Fellenz, B; Gianfelice-Wendt, E; Prieto, P; Rechenmacher, R; Semenov, A; Voy, D; Wendt, M; Zhang, D; Terunuma, N; Urakawa, J

2012-01-01T23:59:59.000Z

353

NO. REV. MO. _ ALSEP/LCRU EMC Test Results  

E-Print Network [OSTI]

NO. REV. MO. ATM 1050 _ ALSEP/LCRU EMC Test Results PAGE 1 OF 10 DATE 19 August 1971 The results of the ALSEP/LCRU EMC test are reported in this ATM. C~.·--~ s--·~e'Jn~,__')!).Prepared by:__~~~"f--.;;.~-------- Approved by: ~JM.MD. ithian #12;NO. RIV. NO. ATM 1050 ALSEP/LCRU EMC Test Results 2 10PAGE OF Aall

Rathbun, Julie A.

354

Missouri Department of National Resources Energy Center Mo DNR | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte GmbHMilo, Maine:Energy Information Energy Center Mo DNR Jump

355

IRRADIATION PERFORMANCE OF U-Mo MONOLITHIC FUEL  

SciTech Connect (OSTI)

High-performance research reactors require fuel that operates at high specific power to high fission density, but at relatively low temperatures. Research reactor fuels are designed for efficient heat rejection, and are composed of assemblies of thin-plates clad in aluminum alloy. The development of low-enriched fuels to replace high-enriched fuels for these reactors requires a substantially increased uranium density in the fuel to offset the decrease in enrichment. Very few fuel phases have been identified that have the required combination of very-high uranium density and stable fuel behavior at high burnup. UMo alloys represent the best known tradeoff in these properties. Testing of aluminum matrix U-Mo aluminum matrix dispersion fuel revealed a pattern of breakaway swelling behavior at intermediate burnup, related to the formation of a molybdenum stabilized high aluminum intermetallic phase that forms during irradiation. In the case of monolithic fuel, this issue was addressed by eliminating, as much as possible, the interfacial area between U-Mo and aluminum. Based on scoping irradiation test data, a fuel plate system composed of solid U-10Mo fuel meat, a zirconium diffusion barrier, and Al6061 cladding was selected for development. Developmental testing of this fuel system indicates that it meets core criteria for fuel qualification, including stable and predictable swelling behavior, mechanical integrity to high burnup, and geometric stability. In addition, the fuel exhibits robust behavior during power-cooling mismatch events under irradiation at high power.

M.K. Meyer; J. Gan; J.-F. Jue; D.D. Keiser; E. Perez; A. Robinson; D.M. Wachs; N. Woolstenhulme; G.L. Hofman; Y.-S. Kim

2014-04-01T23:59:59.000Z

356

Long-term corrosion of Cr-Mo steels in superheated steam at 482 and 538/sup 0/C. [21/4 Cr-1 Mo; 9 Cr-1 Mo; Sumitomo 9 Cr-2 Mo; Sandvik HT-9  

SciTech Connect (OSTI)

The corrosion of several Cr-Mo ferritic steels was investigated in superheated steam at an operating power plant. Tests were conducted at 482 and 538/sup 0/C (900 and 1000/sup 0/F) in a once-through loop for times up to 28,000 h. Chromium concentrations ranged from 2.0 to 11.3%, and the effect of surface preparation on corrosion was investigated. Only one of many specimens showed evidence of exfoliation at 482/sup 0/C, but at 538/sup 0/C exfoliation occurred on at least some of the specimens of most materials; the exceptions were the alloy with the highest chromium content (Sandvik HT-9), one heat of 9 Cr-1 Mo steel with the highest silicon content, and Sumitomo 9 Cr-2 Mo steel, which was in test for only 19,000 h. Parabolic oxidation kinetics adequately described the corrosion process for about the first year, after which corrosion rates were constant and lower than predicted from extrapolation of the initial part of the penetration versus time curves. With chromium concentrations between 2 and 9%, corrosion behavior was independent of chromium content, and corrosion was only slightly less with Sandvik HT-9. Corrosion was nearly independent of surface preparation, but in two cases the presence of mill scale on the surface prior to steam exposure seemed to retard oxidation in steam. 11 figures, 5 tables.

Griess, J.C.; DeVan, J.H.; Maxwell, W.A.

1980-01-01T23:59:59.000Z

357

Physical Protection System Upgrades - Optimizing for Performance and Cost  

SciTech Connect (OSTI)

CPA--Cost and Performance Analysis--is an architecture that supports analysis of physical protection systems and upgrade options. ASSESS (Analytic System and Software for Evaluating Security Systems), a tool for evaluating performance of physical protection systems, currently forms the cornerstone for evaluating detection probabilities and delay times of the system. Cost and performance data are offered to the decision-maker at the systems level and to technologists at the path-element level. A new optimization engine has been attached to the CPA methodology to automate analyses of many combinations (portfolios) of technologies. That engine controls a new analysis sequencer that automatically modifies ASSESS PPS files (facility descriptions), automatically invokes ASSESS Outsider analysis and then saves results for post-processing. Users can constrain the search to an upper bound on total cost, to a lower bound on level of performance, or to include specific technologies or technology types. This process has been applied to a set of technology development proposals to identify those portfolios that provide the most improvement in physical security for the lowest cost to install, operate and maintain at a baseline facility.

Bouchard, Ann M.; Hicks, Mary Jane

1999-07-09T23:59:59.000Z

358

Prototype of time digitizing system for BESIII endcap TOF upgrade  

E-Print Network [OSTI]

The prototype of time digitizing system for the upgrade of BESIII endcap TOF (ETOF) is introduced in this paper. The ETOF readout electronics has a formation of distributed architecture that hit signal from multi-gap resistive plate chamber (MRPC) is signaled as LVDS by front-end electronics (FEE) and sent to the back-end time digitizing system via long shield differential twisted pair cables. The ETOF digitizing system consists of 2 VME crates each of which contains modules of time digitizing, clock, trigger and fast control etc. The time digitizing module (TDIG) of this prototype can support up to 72 electrical channels of hit information measurement. The fast control (FCTL) module can operate at barrel or endcap mode. The barrel FCTL fans fast control signals from the trigger system out to endcap FCTLs, merges data from endcaps and transfers to the trigger system. Without modifying the barrel TOF structure, this time digitizing architecture benefits for improving ETOF performance without degrading barrel TOF measuring. Lab experiments show that the time resolution of this digitizing system can be less than 20ps, and the data throughput to DAQ can be about 92Mbps. Beam experiments show that the complete time resolution can be less than 45ps.

Cao Ping; Sun Wei-Jia; Ji Xiao-Lu; Fan Huan-Huan; Wang Si-Yu; Liu Shu-Bin; An Qi

2013-05-30T23:59:59.000Z

359

Ammonia removal process upgrade to the Acme Steel Coke Plant  

SciTech Connect (OSTI)

The need to upgrade the ammonia removal process at the Acme Steel Coke Plant developed with the installation of the benzene NESHAP (National Emission Standard for Hazardous Air Pollutants) equipment, specifically the replacement of the final cooler. At Acme Steel it was decided to replace the existing open cooling tower type final cooler with a closed loop direct spray tar/water final cooler. This new cooler has greatly reduced the emissions of benzene, ammonia, hydrogen sulfide and hydrogen cyanide to the atmosphere, bringing them into environmental compliance. At the time of its installation it was not fully recognized as to the effect this would have on the coke oven gas composition. In the late seventies the decision had been made at Acme Steel to stop the production of ammonia sulfate salt crystals. The direction chosen was to make a liquid ammonia sulfate solution. This product was used as a pickle liquor at first and then as a liquid fertilizer as more markets were developed. In the fall of 1986 the ammonia still was brought on line. The vapors generated from the operation of the stripping still are directed to the inlet of the ammonia absorber. At that point in time it was decided that an improvement to the cyclical ammonia removal process was needed. The improvements made were minimal yet allowed the circulation of solution through the ammonia absorber on a continuous basis. The paper describes the original batch process and the modifications made which allowed continuous removal.

Harris, J.L. [Acme Steel Co., Chicago, IL (United States). Chicago Coke Plant

1995-12-01T23:59:59.000Z

360

Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

Anna Lee Tonkovich

2008-08-11T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Booster Synchrotron RF System Upgrade for SPEAR3  

SciTech Connect (OSTI)

Recent progress at the SPEAR3 includes the increase in stored current from 100 mA to 200 mA and top-off injection to allow beamlines to stay open during injection. Presently the booster injects 3.0 GeV beam to SPEAR3 three times a day. The stored beam decays to about 150 mA between the injections. The growing user demands are to increase the stored current to the design value of 500 mA, and to maintain it at a constant value within a percent or so. To achieve this goal the booster must inject once every few minutes. For improved injection efficiency, all RF systems at the linac, booster and SPEAR3 need to be phase-locked. The present booster RF system is basically a copy of the SPEAR2 RF system with 358.5 MHz and 40 kW peak RF power driving a 5-cell RF cavity for 1.0 MV gap voltage. These requirements entail a booster RF system upgrade to a scaled down version of the SPEAR3 RF system of 476.3 MHz with 1.2 MW cw klystron output power capabilities. We will analyze each subsystem option for their merits within budgetary and geometric space constraints. A substantial portion of the system will come from the decommissioned PEP-II RF stations.

Park, Sanghyun; /SLAC; Corbett, Jeff; /SLAC

2012-07-06T23:59:59.000Z

362

Future Upgrade and Physics Perspectives of the ALICE TPC  

E-Print Network [OSTI]

The ALICE experiment at the Large Hadron Collider (LHC) proposes major detector upgrades to fully exploit the increase of the luminosity of the LHC in RUN~3 and to extend the physics reach for rare probes at low transverse momentum. The Time Projection Chamber (TPC) is one of the main tracking and PID devices in the central barrel of ALICE. The maximum trigger rate of the TPC is currently limited to about 3.5 kHz by the operation of a gating grid system. In order to make full use of the luminosity in RUN 3, the TPC is foreseen to be operated in an ungated mode with continuous readout. The existing MWPC readout will be replaced by a Micro-Pattern Gaseous Detector (MPGD) based readout, which provides intrinsic ion capture capability without gating. Extensive detector R\\&D employing Gas Electron Multiplier (GEM) and Micro-Mesh Gaseous detector (Micromegas) technologies, and simulation studies to advance the techniques for the corrections of space-charge distortions have been performed since 2012. In this paper, the expected detector performance and the status of the R\\&D program to achieve this ambitious goal are described.

Taku Gunji; for the ALICE Collaboration

2014-08-15T23:59:59.000Z

363

Fast Beam Condition Monitor for CMS: performance and upgrade  

E-Print Network [OSTI]

The CMS beam and radiation monitoring subsystem BCM1F (Fast Beam Condition Monitor) consists of 8 individual diamond sensors situated around the beam pipe within the pixel detector volume, for the purpose of fast bunch-by-bunch monitoring of beam background and collision products. In addition, effort is ongoing to use BCM1F as an online luminosity monitor. BCM1F will be running whenever there is beam in LHC, and its data acquisition is independent from the data acquisition of the CMS detector, hence it delivers luminosity even when CMS is not taking data. A report is given on the performance of BCM1F during LHC run I, including results of the van der Meer scan and on-line luminosity monitoring done in 2012. In order to match the requirements due to higher luminosity and 25 ns bunch spacing, several changes to the system must be implemented during the upcoming shutdown, including upgraded electronics and precise gain monitoring. First results from Run II preparation are shown.

Jessica L. Leonard; Alan Bell; Piotr Burtowy; Anne Dabrowski; Maria Hempel; Hans Henschel; Wolfgang Lange; Wolfgang Lohmann; Nathaniel Odell; Marek Penno; Brian Pollack; Dominik Przyborowski; Vladimir Ryjov; David Stickland; Roberval Walsh; Weronika Warzycha; Agnieszka Zagozdzinska

2014-05-08T23:59:59.000Z

364

Linac cryogenic distribution system maintenance and upgrades at JLab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

2014-01-29T23:59:59.000Z

365

Linac cryogenic distribution system maintenance and upgrades at Jlab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

2014-01-01T23:59:59.000Z

366

A Superconducting Magnet Upgrade of the ATF2 Final Focus  

SciTech Connect (OSTI)

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R&D FF prototype under construction at BNL.

Parker, Brett; /Brookhaven; Anerella, Michael; /Brookhaven; Escallier, John; /Brookhaven; He, Ping; /Brookhaven; Jain, Animesh; /Brookhaven; Marone, Andrew; /Brookhaven; Wanderer, Peter; /Brookhaven; Wu, Kuo-Chen; /Brookhaven; Bambade, Philip; /Orsay, LAL; Bolzon, Benoit; /Annecy, LAPP; Jeremie, Andrea; /Annecy, LAPP; Coe, Paul; /Oxford U.; Urner, David /Oxford U.; Hauviller, Claude; /CERN; Marin, Eduardo; /CERN; Tomas, Rogelio; /CERN; Zimmermann, Frank; /CERN; Kimura, Nobuhiro; /KEK, Tsukuba; Kubo, Kiyoshi; /KEK, Tsukuba; Kume, Tatsuya /KEK, Tsukuba; Kuroda, Shigeru; /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /SLAC /SLAC /SLAC

2012-07-05T23:59:59.000Z

367

Screening of processing and upgrading schemes. Task 3  

SciTech Connect (OSTI)

The RFP was predicated on DOE`s desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily ``skimmed`` from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

368

The NIR Upgrade to the SALT Robert Stobie Spectrograph  

E-Print Network [OSTI]

The near infrared (NIR) upgrade to the Robert Stobie Spectrograph (RSS) on the Southern African Large Telescope (SALT), RSS/NIR, extends the spectral coverage of all modes of the visible arm. The RSS/NIR is a low to medium resolution spectrograph with broadband imaging, spectropolarimetric, and Fabry-Perot imaging capabilities. The visible and NIR arms can be used simultaneously to extend spectral coverage from approximately 3200 A to 1.6 um. Both arms utilize high efficiency volume phase holographic gratings via articulating gratings and cameras. The NIR camera is designed around a 2048x2048 HAWAII-2RG detector housed in a cryogenic dewar. The Epps optical design of the camera consists of 6 spherical elements, providing sub-pixel rms image sizes of 7.5 +/- 1.0 um over all wavelengths and field angles. The exact long wavelength cutoff is yet to be determined in a detailed thermal analysis and will depend on the semi-warm instrument cooling scheme. Initial estimates place instrument limiting magnitudes at J = 23.4 and H(1.4-1.6 um) = 21.6 for S/N = 3 in a 1 hour exposure well below the sky noise.

Andrew I. Sheinis; Marsha J. Wolf; Matthew A. Bershady; David A. H. Buckley; Kenneth H. Nordsieck; Ted B. Williams

2006-06-05T23:59:59.000Z

369

A Superconducting Magnet Upgrade of the ATF2 Final Focus  

SciTech Connect (OSTI)

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R and D FF prototype under construction at BNL.

Parker B.; Anerella M.; Escallier J.; He P.; Jain A.; Marone A.; Wanderer P.; Wu K.C.; Hauviller C.; Marin E.; Tomas R.; Zimmermann F.; Bolzon B.; Jeremie A.; Kimura N.; Kubo K.; Kume T.; Kuroda S.; Okugi T.; Tauchi T.; Terunuma N.; Tomaru T.; Tsuchiya K.; Urakawa J.; Yamamoto A.; Bambabe P.; Coe P.; Urner D.; Seryi A.; Spencer C.; White G.

2010-05-23T23:59:59.000Z

370

Pulsed power supply for Nova Upgrade. Final report, August 1, 1991 to March 31, 1992  

SciTech Connect (OSTI)

This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 {mu}m light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps.

Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C. [Univ. of Texas, Austin, TX (US). Center for Electromechanics] [Univ. of Texas, Austin, TX (US). Center for Electromechanics

1992-12-31T23:59:59.000Z

371

1 Di Neujahr 1 Fr 1 Fr 1 Mo Ostermontag 2 Mi 2 Sa 2 Sa 2 Di  

E-Print Network [OSTI]

1 Di Neujahr 1 Fr 1 Fr 1 Mo Ostermontag 2 Mi 2 Sa 2 Sa 2 Di 3 Do 3 So 3 So 3 Mi 4 Fr 4 Mo 4 Mo 4 Do 5 Sa 5 Di 5 Di 5 Fr 6 So 6 Mi 6 Mi 6 Sa 7 Mo 7 Do 7 Do 7 So 8 Di 8 Fr 8 Fr 8 Mo 9 Mi 9 Sa 9 Sa 9 Di 10 Do 10 So 10 So 10 Mi 11 Fr 11 Mo 11 Mo 11 Do 12 Sa 12 Di 12 Di 12 Fr 13 So 13 Mi 13 Mi Power

Grübel, Rudolf

372

Single Phase Melt Processed Powellite (Ba,Ca) MoO{sub 4} For The Immobilization Of Mo-Rich Nuclear Waste  

SciTech Connect (OSTI)

Crystalline and glass composite materials are currently being investigated for the immobilization of combined High Level Waste (HLW) streams resulting from potential commercial fuel reprocessing scenarios. Several of these potential waste streams contain elevated levels of transition metal elements such as molybdenum (Mo). Molybdenum has limited solubility in typical silicate glasses used for nuclear waste immobilization. Under certain chemical and controlled cooling conditions, a powellite (Ba,Ca)MoO{sub 4} crystalline structure can be formed by reaction with alkaline earth elements. In this study, single phase BaMoO{sub 4} and CaMoO{sub 4} were formed from carbonate and oxide precursors demonstrating the viability of Mo incorporation into glass, crystalline or glass composite materials by a melt and crystallization process. X-ray diffraction, photoluminescence, and Raman spectroscopy indicated a long range ordered crystalline structure. In-situ electron irradiation studies indicated that both CaMoO{sub 4} and BaMoO{sub 4} powellite phases exhibit radiation stability up to 1000 years at anticipated doses with a crystalline to amorphous transition observed after 1 X 10{sup 13} Gy. Aqueous durability determined from product consistency tests (PCT) showed low normalized release rates for Ba, Ca, and Mo (<0.05 g/m{sup 2}).

Brinkman, Kyle [Savannah River Site (SRS), Aiken, SC (United States); Marra, James [Savannah River Site (SRS), Aiken, SC (United States); Fox, Kevin [Savannah River Site (SRS), Aiken, SC (United States); Reppert, Jason [Savannah River Site (SRS), Aiken, SC (United States); Crum, Jarrod [Paci fic Northwest National Laboratory , Richland, WA (United States); Tang, Ming [Los Alamos National Laboratory , Los Alamos, NM (United States)

2012-09-17T23:59:59.000Z

373

High-performance MoS{sub 2} transistors with low-resistance molybdenum contacts  

SciTech Connect (OSTI)

In this Letter, molybdenum (Mo) is introduced and evaluated as an alternative contact metal to atomically-thin molybdenum disulphide (MoS{sub 2}), and high-performance field-effect transistors are experimentally demonstrated. In order to understand the physical nature of the interface and highlight the role of the various factors contributing to the Mo-MoS{sub 2} contacts, density functional theory (DFT) simulations are employed, which reveal that Mo can form high quality contact interface with monolayer MoS{sub 2} with zero tunnel barrier and zero Schottky barrier under source/drain contact, as well as an ultra-low Schottky barrier (0.1?eV) at source/drain-channel junction due to strong Fermi level pinning. In agreement with the DFT simulations, high mobility, high ON-current, and low contact resistance are experimentally demonstrated on both monolayer and multilayer MoS{sub 2} transistors using Mo contacts. The results obtained not only reveal the advantages of using Mo as a contact metal for MoS{sub 2} but also highlight the fact that the properties of contacts with 2-dimensional materials cannot be intuitively predicted by solely considering work function values and Schottky theory.

Kang, Jiahao; Liu, Wei; Banerjee, Kaustav, E-mail: kaustav@ece.ucsb.edu [Department of Electrical and Computer Engineering, University of California, Santa Barbara, California 93106 (United States)

2014-03-03T23:59:59.000Z

374

Upgrade of the LHC magnet interconnections thermal shielding  

SciTech Connect (OSTI)

The about 1700 interconnections (ICs) between the Large Hadron Collider (LHC) superconducting magnets include thermal shielding at 50-75 K, providing continuity to the thermal shielding of the magnet cryostats to reduce the overall radiation heat loads to the 1.9 K helium bath of the magnets. The IC shield, made of aluminum, is conduction-cooled via a welded bridge to the thermal shield of the adjacent magnets which is actively cooled. TIG welding of these bridges made in the LHC tunnel at installation of the magnets induced a considerable risk of fire hazard due to the proximity of the multi-layer insulation of the magnet shields. A fire incident occurred in one of the machine sectors during machine installation, but fortunately with limited consequences thanks to prompt intervention of the operators. LHC is now undergoing a 2 years technical stop during which all magnet's ICs will have to be opened to consolidate the magnet electrical connections. The IC thermal shields will therefore have to be removed and re-installed after the work is completed. In order to eliminate the risk of fire hazard when re-welding, it has been decided to review the design of the IC shields, by replacing the welded bridges with a mechanical clamping which also preserves its thermal function. An additional advantage of this new solution is the ease in dismantling for maintenance, and eliminating weld-grinding operations at removal needing radioprotection measures because of material activation after long-term operation of the LHC. This paper describes the new design of the IC shields and in particular the theoretical and experimental validation of its thermal performance. Furthermore a status report of the on-going upgrade work in the LHC is given.

Musso, Andrea; Barlow, Graeme; Bastard, Alain; Charrondiere, Maryline; Deferne, Guy; Dib, Galle; Duret, Max; Guinchard, Michael; Prin, Herv; Craen, Arnaud Vande; Villiger, Gilles [CERN European Organization for Nuclear Research, Meyrin 1211, Geneva 23, CH (Switzerland); Chrul, Anna [The Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences, ul.Radzikowskiego 152, 31-324 Krakow (Poland); Damianoglou, Dimitrios [NTUA National Technical University of Athens, Heeron Polytechniou 9, 15780 Zografou (Greece); Strychalski, Micha? [Wroclaw University of Technology, Faculty of Mechanical and Power Engineering, Wyb. Wyspianskiego 27, Wroclaw, 50-370 (Poland); Wright, Loren [Lancaster University, Bailrigg, Lancaster, LA1 4YW (United Kingdom)

2014-01-29T23:59:59.000Z

375

Simulation of the treat-upgrade automatic reactor control system  

SciTech Connect (OSTI)

This paper describes the design of the Automatic Reactor Control System (ARCS) for the Transient Reactor Test Facility (TREAT) Upgrade. A simulation was used to facilitate the ARCS design, and to completely test and verify its operation before installation at the TREAT facility. The ARCS is a microprocessor network based closed loop control system that provides a position demand control signal to the transient rod hydraulic drive system. There are four identical servo-hydraulic rod drives and each operates as a position control system. The ARCS updates its position demand control signal every 1 msec and its function is to control the transient rods so that the reactor follows a prescribed power-time profile (planned transient). The Main Control Algorithm (MCA) for the ARCS is an optimal reactivity demand algorithm. At each time step, the MCA generates a set of reference reactor functions, e.g., power, period, energy, and delayed neutron power. These functions are compared to plant measurements and estimated values at each time step and are operated on by appropriate algorithms to generate the reactivity demand function. The data necessary to calculate the reference functions is supplied from a Transient Prescription Control Data Set (TPCDS). The TPCDS specifies the planned transient as a fixed number of simply connected independent power profile segments. The developed simulation code models the TREAT reactor kinetics, the hydraulic rod drive system, the plant measurement system, and the ARCS control processor MCA. All of the models operate as continuous systems with the exception of the MCA which operates as a discrete time system at fixed multiples of 1 msec. The study indicates that the ARCS will meet or exceed all of its design specifications.

Lipinski, W.C.; Kirsch, L.W.; Valente, A.D.

1985-02-01T23:59:59.000Z

376

Digital I and C system upgrade integration technique  

SciTech Connect (OSTI)

This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A solid review can assure the quality of the digital I and C system replacement. (authors)

Huang, H. W. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Shih, C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China); Wang, J. R. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Huang, K. C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China)

2012-07-01T23:59:59.000Z

377

AN APPLICATION OF GAME THEORY: FUNDING INTERDEPENDENT MC and A UPGRADE DECISIONS  

SciTech Connect (OSTI)

Funding Material, Control and Accountability (MC&A) system upgrades has been identified as a partial solution for mitigating the diversion threat of weapons-grade nuclear material. Effective MC&A system upgrades are dependent on appropriate decisions based on based on funding, implementation, operation and oversight. Traditional MC&A upgrade decisions inherently assumed that all decision-makers possessed similar payoff vectors allowing for a fairly consistent and unified approach to MC&A system enhancements; however, MC&A upgrade projects in non-traditional environments may be required to take into account situations where the potential payoff vectors among decision-makers may be significantly different. Once a decision-maker is required to take into account the decisions of others, the process can be modeled as a game. Game theory has been previously be used to shed light on many aspects of social and economic behavior where a payoff from a set of strategies is dependent on the strategy of others. In this paper, the application of game theory in the context of MC&A upgrades is discussed. Various MC&A upgrades decision payoff matrices for relevant circumstances are evaluated for static (simultaneous) and dynamic (sequential decisions) games. Optimal strategies and equilibrium conditions for these payoff matrices are analyzed. Additional game factors (bargaining, uncertain outcomes, moral hazards) that may affect the outcome of the game are briefly discussed. By demonstrating the application of game theory to a nontraditional environment that may require MC&A upgrades, this work increases the understanding out how outcomes are logically connected to the respective value decision-makers assign to choices.

B. G. SCOTT

2001-06-01T23:59:59.000Z

378

Characterization of fundamental catalytic properties of MoS2/WS2 nanotubes and nanoclusters for desulfurization catalysis - a surface temperature study  

SciTech Connect (OSTI)

The prior project consisted of two main project lines. First, characterization of novel nanomaterials for hydrodesulfurization (HDS) applications. Second, studying more traditional model systems for HDS such as vapor-deposited silica-supported Mo and MoSx clusters. In the first subproject, we studied WS2 and MoS2 fullerene-like nanoparticles as well as WS2 nanotubes. Thiophene (C4H4S) was used as the probe molecule. Interestingly, metallic and sulfur-like adsorption sites could be identified on the silica-supported fullerene-particles system. Similar structures are seen for the traditional system (vapor-deposited clusters). Thus, this may be a kinetics fingerprint feature of modern HDS model systems. In addition, kinetics data allowed characterization of the different adsorption sites for thiophene on and inside WS2 nanotube bundles. The latter is a unique feature of nanotubes that has not been reported before for any inorganic nanotube system; however, examples are known for carbon nanotubes, including prior work of the PI. Although HDS has been studied for decades, utilizing nanotubes as nanosized HDS reactors has never been tried before, as far as we know. This is of interest from a fundamental perspective. Unfortunately, the HDS activity of the nanocatalysts at ultra-high vacuum (UHV) conditions was close to the detection limit of our techniques. Therefore, we propose to run experiments at ambient pressure on related nanopowder samples as part of the renewal application utilizing a now-available GC (gas chromatograph) setup. In addition, Ni and Co doped nanocatalyts are proposed for study. These dopants will boost the catalytic activity. In the second subproject of the prior grant, we studied HDS-related chemistry on more traditional supported cluster catalysts. Mo clusters supported by physical vapor deposition (PVD) on silica have been characterized. Two reaction pathways are evident when adsorbing thiophene on Mo and MoSx clusters: molecular adsorption and dissociation. PVD Mo clusters turned out to be very reactive toward thiophene bond activation. Sulfur and carbon residuals form, which poison the catalyst and sulfide the Mo clusters. Sulfided silica-supported MoSx samples are not reactive toward thiophene bond activation. In addition to S and C deposits, H2, H2S, and small organic molecules were detected in the gas phase. Catalyst reactivation procedures, including O2 and atomic hydrogen treatments, have been tested. Cluster size effects have been seen: thiophene adsorbs molecularly with larger binding energies on smaller clusters. However, larger clusters have smaller activation energy for C4H4S bond activation than smaller clusters. The latter is consistent with early catalysis studies. Kinetics and dynamics parameters have been determined quantitatively. We spent a significant amount of time on upgrades of our equipment. A 2nd-hand refurbished X-ray photoelectron spectrometer (XPS) has been integrated into the existing molecular beam scattering system and is already operational (supported by the DoE supplemental grant available in October 2009). We also added a time of flight (TOF) system to the beam scattering apparatus and improved on the accessible impact energy range (new nozzle heater and gas mixing manifold) for the beam scattering experiments. In addition, a GC-based powder atmospheric flow reactor for studies on powder samples is now operational. Furthermore, a 2nd UHV kinetics system has been upgraded as well. In summary, mostly single crystal systems have so far been considered in basic science studies about HDS. Industrial catalysts, however, can be better approximated with the supported cluster systems that we studied in this project. Furthermore, an entirely new class of HDS systems, namely fullerene-like particles and inorganic nanotubes, has been included. Studying new materials and systems has the potential to impact science and technology. The systems investigated are closely related to energy and environmental-related surface science/catalysis. This prior project, conducted at NDSU by a sma

U. Burghaus

2012-07-05T23:59:59.000Z

379

Simple Molybdenum(IV) Olefin Complexes of the Type Mo(NR)(X)(Y)(olefin)  

E-Print Network [OSTI]

Exposure of heptane solutions of Mo(NAr)(CHCMe2Ph)(Me2Pyr)(OAr) (1a; Ar = 2,6-diisopropylphenyl), Mo(NAr)(CHCMe3)(Me2Pyr)[OCMe(CF3)2] (1b), and Mo(NAr)(CHCMe2Ph)(Me2Pyr)(OSiPh3) (1c) to one atmosphere of ethylene for 12 h ...

Marinescu, Smaranda C.

380

Greenfield Alternative Study LEU-Mo Fuel Fabrication Facility  

SciTech Connect (OSTI)

This report provides the initial first look of the design of the Greenfield Alternative of the Fuel Fabrication Capability (FFC); a facility to be built at a Greenfield DOE National Laboratory site. The FFC is designed to fabricate LEU-Mo monolithic fuel for the 5 US High Performance Research Reactors (HPRRs). This report provides a pre-conceptual design of the site, facility, process and equipment systems of the FFC; along with a preliminary hazards evaluation, risk assessment as well as the ROM cost and schedule estimate.

Washington Division of URS

2008-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Structural Insights into FeMo Cofactor Biosynthesis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutronStrategic PlanStructuralMethodologyInsights into FeMo

382

CMS hadron calorimeter front-end upgrade for SLHC phase I  

SciTech Connect (OSTI)

We present an upgrade plan for the CMS HCAL detector. The HCAL upgrade is required for the increased luminosity (3 * 10E34) of SLHC Phase I which is targeted for 2014. A key aspect of the HCAL upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at the L1 trigger. The increased segmentation is achieved by replacing the hybrid photodiodes (HPDs) with silicon PMTs (SIPMs). We plan to instrument each fiber of the calorimeter with an SIPM (103,000 total). We will then electrically sum outputs from selected SIPMs to form the longitudinal readout segments. In addition to having more longitudinal information, the upgrade plans include a new custom ADC with matched sensitivity and timing information. The increased data volume requires higher speed transmitters and the additional power dissipation for the readout electronics requires better thermal design, since much of the on-detector infrastructure (front-end electronics crates, cooling pipes, optical fiber plant, etc.) will remain the same. We will report on the preliminary designs for these upgraded systems, along with performance requirements and initial design studies.

Whitmore, Juliana; /Fermilab

2009-09-01T23:59:59.000Z

383

Conceptual design of a new homogeneous reactor for medical radioisotope Mo-99/Tc-99m production  

SciTech Connect (OSTI)

To partly solve the global and regional shortages of Mo-99 supply, a conceptual design of a nitrate-fuel-solution based homogeneous reactor dedicated for Mo-99/Tc-99m medical radioisotope production is proposed. The modified LEU Cintichem process for Mo-99 extraction which has been licensed and demonstrated commercially for decades by BATAN is taken into account as a key design consideration. The design characteristics and main parameters are identified and the advantageous aspects are shown by comparing with the BATAN's existing Mo-99 supply chain which uses a heterogeneous reactor (RSG GAS multipurpose reactor)

Liem, Peng Hong [Nippon Advanced Information Service (NAIS Co., Inc.) Scientific Computational Division, 416 Muramatsu, Tokaimura, Ibaraki (Japan); Tran, Hoai Nam [Chalmers University of Technology, Dept. of Applied Physics, Div. of Nuclear Engineering, SE-412 96 Gothenburg (Sweden); Sembiring, Tagor Malem [National Nuclear Energy Agency (BATAN), Center for Reactor Technology and Nuclear Safety, Kawasan Puspiptek, Serpong, Tangerang Selatan, Banten (Indonesia); Arbie, Bakri [PT MOTAB Technology, Kedoya Elok Plaza Blok DA 12, Jl. Panjang, Kebun Jeruk, Jakarta Barat (Indonesia)

2014-09-30T23:59:59.000Z

384

Oxidation Behavior of Mo-Si-B Alloys in Wet Air  

SciTech Connect (OSTI)

Multiphase composite alloys based on the Mo-Si-B system are candidate materials for ultra-high temperature applications. In non load-bearing uses such as thermal barrier coatings or heat exchangers in fossil fuel burners, these materials may be ideally suited. The present work investigated the effect of water vapor on the oxidation behavior of Mo-Si-B phase assemblages. Three alloys were studied: Alloy 1 = Mo{sub 5}Si{sub 3}B{sub x} (T1)- MoSi{sub 2}- MoB, Alloy 2 = T1- Mo{sub 5}SiB{sub 2} (T2)- Mo{sub 3}Si, and Alloy 3 = Mo- T2- Mo{sub 3}Si. Tests were conducted at 1000 and 1100C in controlled atmospheres of dry air and wet air nominally containing 18, 55, and 150 Torr H{sub 2}O. The initial mass loss of each alloy was approximately independent of the test temperature and moisture content of the atmosphere. The magnitude of these initial losses varied according to the Mo content of the alloys. All alloys formed a continuous, external silica scale that protected against further mass change after volatilization of the initially formed MoO{sub 3}. All alloys experienced a small steady state mass change, but the calculated rates cannot be quantitatively compared due to statistical uncertainty in the individual mass measurements. Of particular interest is that Alloy 3, which contains a significant volume fraction of Mo metal, formed a protective scale. All alloys formed varying amounts of subscale Mo and MoO{sub 2}. This implies that oxygen transport through the external silica scale has been significantly reduced. For all alloys, water vapor accelerated the growth of a multiphase interlayer at the silica scale/unoxidized alloy interface. This interlayer is likely composed of fine Mo and MoO{sub 2} that is dispersed within a thin silica matrix. Alloy 3 was particularly sensitive to water accelerated growth of this interlayer. At 1100 C, the scale thickness after 300 hours increased from about 20 mm in dry air to nearly 100 mm in wet air.

M. Kramer; A. Thom; O. Degirmen; V. Behrani; M. Akinc

2002-04-22T23:59:59.000Z

385

Experimental activities supporting commercial U.S. accelerator production of 99-Mo  

SciTech Connect (OSTI)

{sup 99m}Tc, the daughter product of {sup 99}Mo, is the most commonly used radioisotope for nuclear medicine in the U.S. Experiments are being performed at Los Alamos National Laboratory and Argonne National Laboratory to demonstrate production of {sup 99}Mo using accelerators. The {sup 100}Mo({gamma},n){sup 99}Mo reaction in an enriched {sup 100}Mo target is currently under investigation. Three scaled low-power production experiments using a 20-MeV electron linac at Argonne have been performed to date. Two of these experiments used natural Mo targets and produced a total of 613 {mu}C of {sup 99}Mo. The third experiment used an enriched {sup 100}Mo target and produced 10.5 mCi of {sup 99}Mo. Following irradiation the targets were dissolved and the low specific activity solution was processed through an ARSII generator from NorthStar Medical Radioisotopes. Yields of {sup 99m}Tc >95% have been observed.

Dale, Gregory E [Los Alamos National Laboratory; Chemerisov, Sergey D [ANL; Vandegrift, George F [ANL

2010-01-01T23:59:59.000Z

386

HYBRID SULFUR RECOVERY PROCESS FOR NATURAL GAS UPGRADING  

SciTech Connect (OSTI)

This second quarter report of 2002 describes progress on a project funded by the U.S. Department of Energy (DOE) to test a hybrid sulfur recovery process for natural gas upgrading. The process concept represents a low cost option for direct treatment of natural gas streams to remove H{sub 2}S in quantities equivalent to 0.2-25 metric tons (LT) of sulfur per day. This process is projected to have lower capital and operating costs than the competing technologies, amine/aqueous iron liquid redox and amine/Claus/tail gas treating, and have a smaller plant footprint, making it well suited to both on-shore and offshore applications. CrystaSulf (service mark of CrystaTech, Inc.) is a new nonaqueous sulfur recovery process that removes hydrogen sulfide (H{sub 2}S) from gas streams and converts it into elemental sulfur. CrystaSulf features high sulfur recovery similar to aqueous-iron liquid redox sulfur recovery processes, but differs from the aqueous processes in that CrystaSulf controls the location where elemental sulfur particles are formed. In the hybrid process, approximately 1/3 of the total H{sub 2}S in the natural gas is first oxidized to SO{sub 2} at low temperatures over a heterogeneous catalyst. Low temperature oxidation is done so that the H{sub 2}S can be oxidized in the presence of methane and other hydrocarbons without oxidation of the hydrocarbons. The project involves the development of a catalyst using laboratory/bench-scale catalyst testing, and then demonstration of the catalyst at CrystaTech's pilot plant in west Texas. Previous reports described development of a catalyst with the required selectivity and efficiency for producing sulfur dioxide from H{sub 2}S. In the laboratory, the catalyst was shown to be robust and stable in the presence of several intentionally added contaminants, including condensate from the pilot plant site. This report describes testing using the laboratory apparatus but operated at the pilot plant using the actual pilot plant gas, which contains far more contaminants than can be simulated in the laboratory. The results are very encouraging, with stable and efficient operation being obtained for a prolonged period of time.

Girish Srinivas; Steven C. Gebhard; David W. DeBerry

2002-07-01T23:59:59.000Z

387

Conceptual design report: Neutrino physics after the Main Injector upgrade  

SciTech Connect (OSTI)

The Main Injector will provide an unprecedented opportunity for challenging the Standard Model. The increased fluxes available from this essential upgrade make possible neutrino experiments of great power both at the Tevatron and at intermediate energies. With a factor of six increase in flux, experiments at higher energies probe with great sensitivity the electroweak sector, test QCD, and search for rare processes which could point the way to new physics. Such experiments can make simultaneous measurements of the Standard Model {rho} parameter and sin{sup 2} {theta}{sub W} to 0.25% and 0.6%, respectively. Measurements of the radiative corrections in electroweak physics will reveal physics at the TeV mass scale. {rho} probes the Higgs sector, and deviations from its expected value would be unambiguous signals of new phenomena and possibly our first clear window into physics beyond the Standard Model. Another way to quantify these corrections is through measurements of sin{sup 2} {theta}{sub W} in different processes; comparisons among an ensemble of precise electroweak measurements can then distinguish among alternatives and pin down the sources of new phenomena. Four processes likely to be important in the coming decade are the direct boson mass measurements, Z polarization asymmetries, atomic parity violation, and neutrino-nucleon scattering. Each of these processes has a different dependence on the various sources of new physics: such phenomena as multiple Z's, supersymmetry, or technicolor are just three of many possibilities. Neutral current measurements of sin{sup 2} {theta}{sub W} and {rho} have already provided constraints on m{sub t}; improved measurements will extend their reach and help us interpret the information from the colliders. QCD tests, especially those involving the structure function xF{sub 3}, can check two fundamental predictions of the theory: the dependence of the strong-coupling constant {alpha}{sub S}(Q{sup 2}) on Q{sup 2}, and the value (and Q{sup 2} dependence) of R{sub QCD} = {sigma}{sub L}/{sigma}{sub T}. A Main Injector experiment will check the scaling violation of the theory and provide solid measurements of the gluon distributions.

Bernstein, R.; Beverly, L.; Browning, F.; Childress, S.; Freeman, W.; Jacobsen, V.; Koizumi, G.; Krider, J.; Kula, L.; Malensek, A.; Pordes, Stephen H.; /Fermilab /Ohio State U.

1991-01-01T23:59:59.000Z

388

High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test  

SciTech Connect (OSTI)

About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

Richard D. Boardman; B. H. O'Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

2004-02-01T23:59:59.000Z

389

Reaction propagation physics of AL/Mo0? nanocomposite thermites.  

SciTech Connect (OSTI)

Recent advances in the field of nmo-technology have focused intense interest on developing nano-scale energetic materials with potentially new and technologically useful characteristics. Despite the growing importance of nano-scale energetic materials, however, general combustion chmcteristics of ithese materials are not yet well characterized or understood. This study experimentally examines the mechanisms and phenomena that govern thermal and chemical proce!;ses associated with nano-structured energetic material combustion. Specifically, the general combusticm behavior of nanocornposite Al/MoO3 samples was observed. The composite material was prepared fiom nano-scale aluminum and molybdenum trioxide. Open combustion and confined burning were considered. Ai/Mo03 powder or pellet samples were ignited at one end in an open burxi tway and a high-speed imaging system recorded the flame propagation. Reaction behaviors were characterized from this photographic data. The goal was to obtain an improved understanding of flow pattenis (e.g., flame propagation mechanisms) associated with nano-structured energetic materials. These materials are shown to propagate at very high rates (>I 00 ids). E3ulk density effects on propagation rate iri these materials were found to be significant. Results from this study, and continuing work, could have an impact on the handling and application of nano-scala mergetic materials, and will eventually lead to a significantly improved understanding of this class of materials.

Asay, B. W. (Blaine W.); Busse, J. R. (James R.); Jorgensen, B. S. (Betty S.); Bockmon, B. (Bryan); Pantoya, M. (Michelle); Son, S. F. (Steven F.)

2001-01-01T23:59:59.000Z

390

Characterization of U-Mo Foils for AFIP-7  

SciTech Connect (OSTI)

Twelve AFIP in-process foil samples, fabricated by either Y-12 or LANL, were shipped from LANL to PNNL for potential characterization using optical and scanning electron microscopy techniques. Of these twelve, nine different conditions were examined to one degree or another using both techniques. For this report a complete description of the results are provided for one archive foil from each source of material, and one unirradiated piece of a foil of each source that was irradiated in the Advanced Test Reactor. Additional data from two other LANL conditions are summarized in very brief form in an appendix. The characterization revealed that all four characterized conditions contained a cold worked microstructure to different degrees. The Y-12 foils exhibited a higher degree of cold working compared to the LANL foils, as evidenced by the highly elongated and obscure U-Mo grain structure present in each foil. The longitudinal orientations for both of the Y-12 foils possesses a highly laminar appearance with such a distorted grain structure that it was very difficult to even offer a range of grain sizes. The U-Mo grain structure of the LANL foils, by comparison, consisted of a more easily discernible grain structure with a mix of equiaxed and elongated grains. Both materials have an inhomogenous grain structure in that all of the characterized foils possess abnormally coarse grains.

Edwards, Danny J.; Ermi, Ruby M.; Schemer-Kohrn, Alan L.; Overman, Nicole R.; Henager, Charles H.; Burkes, Douglas; Senor, David J.

2012-11-07T23:59:59.000Z

391

Nuclear safety procedure upgrade project at USEC/MMUS gaseous diffusion plants  

SciTech Connect (OSTI)

Martin Marietta Utility Services has embarked on a program to upgrade procedures at both of its Gaseous Diffusion Plant sites. The transition from a U.S. Department of Energy government-operated facility to U.S. Nuclear Regulatory Commission (NRC) regulated has necessitated a complete upgrade of plant operating procedures and practices incorporating human factors as well as a philosophy change in their use. This program is designed to meet the requirements of the newly written 10CFR76, {open_quotes}The Certification of Gaseous Diffusion Plants,{close_quotes} and aid in progression toward NRC certification. A procedures upgrade will help ensure increased nuclear safety, enhance plant operation, and eliminate personnel procedure errors/occurrences.

Kocsis, F.J. III

1994-12-31T23:59:59.000Z

392

Addendum to the Technical Design Report for the Upgrade of the ALICE Time Projection Chamber  

E-Print Network [OSTI]

This is the addendum to the TDR of the upgrade of the ALICE Time Projection Chamber (CERN-LHCC-2013-020 ; ALICE-TDR-016). The key objective of the upgrade is the replacement of the present MWPC-based readout chambers by detectors that allow continuous operation without active ion gating. In the TDR, we propose a solution that employs stacks of four Gas Electron Multipliers (GEMs) and demonstrate that it fulfills the design specifications, in particular in terms of intrinsic position resolution, energy resolution, and ion backflow. In this document we demonstrate with additional results from both detector R&D and simulations that the technological solution chosen in the TDR has sufficient safety margin for a successful campaign with the upgraded detector in RUN 3 and beyond.

The ALICE Collaboration

2015-01-01T23:59:59.000Z

393

Technical Barriers, Gaps, and Opportunities Related to Home Energy Upgrade Market Delivery  

SciTech Connect (OSTI)

This report outlines the technical barriers, gaps, and opportunities that arise in executing home energy upgrade market delivery approaches, as identified through research conducted by the U.S. Department of Energy's Building America program. The objective of this report is to outline the technical1 barriers, gaps, and opportunities that arise in executing home energy upgrade market delivery approaches, as identified through research conducted by the U.S. Department of Energy's (DOE) Building America program. This information will be used to provide guidance for new research necessary to enable the success of the approaches. Investigation for this report was conducted via publications related to home energy upgrade market delivery approaches, and a series of interviews with subject matter experts (contractors, consultants, program managers, manufacturers, trade organization representatives, and real estate agents). These experts specified technical barriers and gaps, and offered suggestions for how the technical community might address them. The potential benefits of home energy upgrades are many and varied: reduced energy use and costs; improved comfort, durability, and safety; increased property value; and job creation. Nevertheless, home energy upgrades do not comprise a large part of the overall home improvement market. Residential energy efficiency is the most complex climate intervention option to deliver because the market failures are many and transaction costs are high (Climate Change Capital 2009). The key reasons that energy efficiency investment is not being delivered are: (1) The opportunity is highly fragmented; and (2) The energy efficiency assets are nonstatus, low-visibility investments that are not properly valued. There are significant barriers to mobilizing the investment in home energy upgrades, including the 'hassle factor' (the time and effort required to identify and secure improvement works), access to financing, and the opportunity cost of capital and split incentives.

Bianchi, M. V. A.

2011-11-01T23:59:59.000Z

394

Supercapacitor behavior of ?-MnMoO{sub 4} nanorods on different electrolytes  

SciTech Connect (OSTI)

Graphical abstract: SEM image of ?-MnMoO{sub 4} nanorods on FTO substrate. Highlights: ? Synthesis of ?-MnMoO{sub 4} nanorods by spin coating method. ? First study on the effect of electrolyte on the pseudocapacitance behavior. ? ?-MnMoO{sub 4} nanorods exhibit maximum specific capacitance of 998 F/g. ? At higher scan rates p-TSA electrolyte exhibits superior capacitive behavior. -- Abstract: ?-MnMoO{sub 4} nanorods were prepared on conducting glass substrate via solgel spin coating method at the optimum doping level. The effect of electrolyte on the pseudocapacitance behavior of the ?-MnMoO{sub 4} nanorods was studied using para toluene sulfonic acid (p-TSA), sulfuric acid (H{sub 2}SO{sub 4}) and hydrochloric acid (HCl) as electrolytes. X-ray diffraction analysis reveals the formation of ?-MnMoO{sub 4} in monoclinic phase. FTIR spectra contain vibrational bands associated with Mo=O, MO and MoOMo bonds. SEM image reveals the formation of nanorods. Supercapacitor behavior has been studied using cyclic voltammetry (CV) analysis. ?-MnMoO{sub 4} nanorods exhibit maximum specific capacitance of 998 F/g at a scan rate of 5 mV/s in H{sub 2}SO{sub 4} electrolyte while a specific capacitance of 784 F/g and 530 F/g have been obtained using p-TSA and HCl electrolytes, respectively. At higher scan rates p-TSA electrolyte exhibits superior capacitive behavior than H{sub 2}SO{sub 4}.

Purushothaman, K.K., E-mail: purushoth_gri@yahoo.co.in [Department of Physics, TRP Engineering College (SRM Group), Irungalur, Trichy, Tamilnadu (India); Cuba, M. [Department of Physics, Gandhigram Rural Institute Deemed University, Gandhigram, Tamilnadu (India)] [Department of Physics, Gandhigram Rural Institute Deemed University, Gandhigram, Tamilnadu (India); Muralidharan, G., E-mail: muralg@rediffmail.com [Department of Physics, Gandhigram Rural Institute Deemed University, Gandhigram, Tamilnadu (India)

2012-11-15T23:59:59.000Z

395

Development of FeNiMoB thin film materials for microfabricated magnetoelastic sensors  

SciTech Connect (OSTI)

Metglas{sup TM} 2826MB foils of 25-30 {mu}m thickness with the composition of Fe{sub 40}Ni{sub 38}Mo{sub 4}B{sub 18} have been used for magnetoelastic sensors in various applications over many years. This work is directed at the investigation of {approx}3 {mu}m thick iron-nickel-molybdenum-boron (FeNiMoB) thin films that are intended for integrated microsystems. The films are deposited on Si substrate by co-sputtering of iron-nickel (FeNi), molybdenum (Mo), and boron (B) targets. The results show that dopants of Mo and B can significantly change the microstructure and magnetic properties of FeNi materials. When FeNi is doped with only Mo its crystal structure changes from polycrystalline to amorphous with the increase of dopant concentration; the transition point is found at about 10 at. % of Mo content. A significant change in anisotropic magnetic properties of FeNi is also observed as the Mo dopant level increases. The coercivity of FeNi films doped with Mo decreases to a value less than one third of the value without dopant. Doping the FeNi with B together with Mo considerably decreases the value of coercivity and the out-of-plane magnetic anisotropy properties, and it also greatly changes the microstructure of the material. In addition, doping B to FeNiMo remarkably reduces the remanence of the material. The film material that is fabricated using an optimized process is magnetically as soft as amorphous Metglas{sup TM} 2826MB with a coercivity of less than 40 Am{sup -1}. The findings of this study provide us a better understanding of the effects of the compositions and microstructure of FeNiMoB thin film materials on their magnetic properties.

Liang Cai; Gooneratne, Chinthaka; Cha, Dongkyu; Chen Long; Kosel, Jurgen [Computer Electrical and Mathematical Sciences and Engineering, King Abdullah University of Science and Technology, 4700 KAUST, Thuwal 23955 (Saudi Arabia); Gianchandani, Yogesh [Department of Electrical Engineering and Computer Science, 1301 Beal Ave., University of Michigan, Ann Arbor, Michigan 48109 (United States)

2012-12-01T23:59:59.000Z

396

X-ray crystal spectrometer upgrade for ITER-like wall experiments at JET  

SciTech Connect (OSTI)

The high resolution X-Ray crystal spectrometer at the JET tokamak has been upgraded with the main goal of measuring the tungsten impurity concentration. This is important for understanding impurity accumulation in the plasma after installation of the JET ITER-like wall (main chamber: Be, divertor: W). This contribution provides details of the upgraded spectrometer with a focus on the aspects important for spectral analysis and plasma parameter calculation. In particular, we describe the determination of the spectrometer sensitivity: important for impurity concentration determination.

Shumack, A. E., E-mail: amy.shumack@ccfe.ac.uk [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); FOM Institute DIFFER, P.O. Box 1207, NL-3430 BE Nieuwegein (Netherlands); Rzadkiewicz, J. [National Centre for Nuclear Research, Andrzeja So?tana 7, 05-400 Otwock (Poland); Chernyshova, M.; Czarski, T.; Karpinski, L. [Institute of Plasma Physics and Laser Microfusion, Hery 23, 01-497 Warsaw (Poland); Jakubowska, K. [Institute of Plasma Physics and Laser Microfusion, Hery 23, 01-497 Warsaw (Poland); Universit Bordeaux, CNRS, CEA, CELIA, UMR 5107, F-33405 Talence (France); Scholz, M. [Institute of Nuclear Physics PAN, ul. Radzikowskiego 152, 31-342 Krakw (Poland); Byszuk, A.; Cieszewski, R.; Kasprowicz, G.; Pozniak, K.; Wojenski, A.; Zabolotny, W. [Institute of Electronic Systems, Warsaw University of Technology, 00-665 Warsaw (Poland); Dominik, W. [Faculty of Physics, Institute of Experimental Physics, Warsaw University, 00-681 Warsaw (Poland); Conway, N. J.; Dalley, S.; Tyrrell, S.; Zastrow, K.-D. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Figueiredo, J. [EFDA-CSU, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Associao EURATOM/IST, Instituto de Plasmas e Fuso Nuclear, Instituto Superior Tcnico, Av Rovisco Pais, 1049-001 Lisbon (Portugal); and others

2014-11-15T23:59:59.000Z

397

Mechanical and Thermal Prototype Testing for a Rotatable Collimator for the LHC Phase II Collimation Upgrade  

SciTech Connect (OSTI)

The Phase II upgrade to the LHC collimation system calls for complementing the robust Phase I graphite collimators with high Z, low impedance Phase II collimators. The design for the collimation upgrade has not been finalized. One option is to use metallic rotatable collimators and testing of this design will be discussed here. The Phase II collimators must be robust in various operating conditions and accident scenarios. A prototype collimator jaw has been tested for both mechanical and thermal compliance with the design goals. Thermal expansion bench-top tests are compared to ANSYS simulation results.

Smith, Jeffrey Claiborne; Doyle, Eric; Keller, Lewis; Lundgren, Steven; Markiewicz, Thomas Walter; /SLAC; ,

2010-08-26T23:59:59.000Z

398

DESIGN OF THE CEBAF ENERGY UPGRADE CRYOMODULE COLD , I. E. Campisi, J. Delayen, E. Feldl, R. Getz, A. Guerra, J. Henry, J. Mammosser,  

E-Print Network [OSTI]

DESIGN OF THE CEBAF ENERGY UPGRADE CRYOMODULE COLD MASS* J. Hogan , I. E. Campisi, J. Delayen, E, Virginia 23606, USA Abstract The Jefferson Laboratory's CEBAF Energy Upgrade to 12 GeV will be accomplished

399

Upgrade of the PNNL TEPC and Multisphere Spectrometer  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory (PNNL) has used two types of instruments, the tissue equivalent proportional counter (TEPC) and the multisphere spectrometer for characterizing neutron radiation fields in support of neutron dosimetry at the Hanford site. The US Department of Energy recently issued new requirements for radiation protection standards in 10 CFR 835 which affect the way that neutron dose equivalent rates are evaluated. In response to the new requirements, PNNL has upgraded the analyses used in conjunction with the TEPC and multisphere. The analysis software for the TEPC was modified for this effort, and a new analysis code was selected for the multisphere. These new analysis techniques were implemented and tested with measurement data that had been collected in previous measurements. In order to test the effectiveness of the changes, measurements were taken in PNNLs Low Scatter Room using 252Cf sources in both unmoderated and D2O-moderated configurations that generate well-characterized neutron fields. The instruments were also used at Los Alamos National Laboratory (LANL), in their Neutron Free-in-Air calibration room, also using neutron sources that generate well-characterized neutron fields. The results of the software modifications and the measurements are documented in this report. The TEPC measurements performed at PNNL agreed well with accepted dose equivalent rates using the traditional analysis, agreeing with the accepted value to within 13% for both unmoderated and moderated 252Cf sources. When the new analysis was applied to the TEPC measurement data, the results were high compared to the new accepted value. A similar pattern was seen for TEPC measurements at LANL. Using the traditional analysis method, results for all neutron sources showed good agreement with accepted values, nearly always less than 10%. For the new method of analysis, however, the TEPC responded with higher dose equivalent rates than accepted, by as much as 25%. The reason for the overresponse is that there is very little attenuation of the neutrons by tissue, so it cannot match the effect of attenuation by 1 cm of tissue called for in the new standards. This could be corrected with a modified instrument with a thicker wall, or by analytical means that would need to be developed. The multisphere spectrometer performed reasonably well both at PNNL and at LANL. It could produce a neutron spectrum that was similar to the accepted spectrum, and total flux values were usually within 15% of the accepted values. Dose equivalent rates were usually within 18% of the accepted values. The average energies, however, were usually lower than the accepted values. The performance of this instrument could be much better than seen in this study. If PNNL were to add some moderating spheres to its measurement set and calculate a new set of instrument response functions, performance could be improved. The multisphere could then be a more useful instrument for assessing the dose equivalent rate in the workplace.

Scherpelz, Robert I.; Conrady, Matthew M.

2008-09-10T23:59:59.000Z

400

Corrosion Behavior of Solution-Annealed CoCrMo Medical Implant  

E-Print Network [OSTI]

! ! ! Corrosion Behavior of Solution- Annealed CoCrMo Medical Implant Alloys Pooja Panigrahi University June 6, 2011 #12;! ! ""! Corrosion Behavior of Solution-Annealed CoCrMo Medical Implant Alloys and Applied Sciences Northwestern University June 6, 2011 Abstract Corrosion behavior of solution annealed

Shull, Kenneth R.

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Posting type Advisory Subject Shifts in Mo-anode XRF element calibration factors  

E-Print Network [OSTI]

Posting type Advisory Subject Shifts in Mo-anode XRF element calibration factors Module/Species A@crocker.ucdavis.edu Supporting information A molybdenum-anode XRF instrument is used to analyze the heavier elements (Ni, Cu, Zn with lighter deposits were acquired and used in the Mo-anode XRF system. The new calibration foils resulted

Fischer, Emily V.

402

Kinetic, Mechanistic, and Spectroscopic Studies of the Mo/Cu Containing CO dehydrogenase of Oligotropha carboxidovorans  

E-Print Network [OSTI]

et. al. where active site models [Tp iPr MoO(OAr)(?-S)Cu(triazacyclononane) (Tp iPr ) = hydrotris(3-isopropylpyrazol-of CO dehydrogenase: [Tp iPr Mo (V) (O)(OAr)(?-S)Cu (I) (Me

Wilcoxen, Jarett Michael

2013-01-01T23:59:59.000Z

403

Ligand Conjugation of Chemically Exfoliated MoS2 Stanley S. Chou,+  

E-Print Network [OSTI]

Ligand Conjugation of Chemically Exfoliated MoS2 Stanley S. Chou,+ Mrinmoy De,+ Jaemyung Kim,+ Segi and chemical properties. Here, we demonstrate ligand conjugation of chemically exfoliated MoS2 using thiol-nitrilotriacetic acid chelation.13 However, colloidal sur- face modification of water dispersible, chemically exfoliated

Huang, Jiaxing

404

MoIAC Pre-Audit Form Ways to submit this form  

E-Print Network [OSTI]

information: #12;MoIAC Pre-Audit Form Major Energy Consuming Equipment: Please provide informationMoIAC Pre-Audit Form Ways to submit this form: 1. Fill up the form and fax it to 573-882-2693 Attn: Dr. Bin Wu 2. Print and return this form by mail to: Dr. Bin Wu University of Missouri

Noble, James S.

405

Stability of Graphene doping with MoO_3 and I_2  

E-Print Network [OSTI]

We dope graphene by evaporation of MoO_3 or by solution-deposition of I_2 and assess the doping stability for its use as transparent electrodes. Electrical measurements show that both dopants increase the graphene sheet conductivity and find that Mo...

DArsi, Lorenzo; Esconjauregui, Santiago; Weatherup, Robert; Guo, Yuzheng; Bhardwaj, Sunil; Centeno, Alba; Zurutuza, Amaia; Cepek, Cinzia; Robertson, John

2014-09-08T23:59:59.000Z

406

Student Financial Aid 11 Jesse Hall University of Missouri Columbia Columbia, MO 65211-1600  

E-Print Network [OSTI]

Student Financial Aid 11 Jesse Hall University of Missouri ­ Columbia Columbia, MO 65211-1600 PHONE;Student Financial Aid 11 Jesse Hall University of Missouri ­ Columbia Columbia, MO 65211-1600 PHONE (573 ________________________________________________________________________________________________________________________ Name of Host Institution (College or University you will be attending or taking additional classes

Taylor, Jerry

407

ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

Widener, Kevin; Bharadwaj, Nitin; Johnson, Karen

408

Driving Demand for Home Energy Improvements: Motivating residential customers to invest in comprehensive upgrades that eliminate energy waste, avoid high utility bills, and spur the economy  

E-Print Network [OSTI]

home energy upgrades by developing a community that supports behaviorhome energy use, beyond lighting replacements or small changes in behavior.

Fuller, Merrian C.

2011-01-01T23:59:59.000Z

409

Development of LEU targets for {sup 99}Mo production and their chemical processing status 1993  

SciTech Connect (OSTI)

Most of the world`s supply of {sup 99m}{Tc} for medical purposes is currently produced from {sup 99}Mo derived from the fastening of high enriched uranium (HEU). Substitution of low enriched uranium (LEU) silicide fuel for the HEU alloy and aluminide fuels used in current target designs will allow equivalent {sup 99}Mo yields with little change in target geometries. Substitution of uranium metal for uranium oxide films in other target designs will also allow the substitution of LEU for HEU. In 1993, DOE renewed funding that was terminated in 1990 for development of LEU targets for {sup 99}Mo production. During the past year, our efforts were to (1) renew contact with {sup 99}Mo producers, (2) define the means to test our process for recovering {sup 99}Mo from irradiated LEU-silicide targets, and (3) begin to test our process on spent LEU-silicide miniplates stored at ANL from past fuel development studies.

Vandegrift, G.F.; Hutter, J.C.; Srinivasan, B.; Matos, J.E.; Snelgrove, J.L.

1993-10-01T23:59:59.000Z

410

Jim Nelson, Camp Joy Gardens  

E-Print Network [OSTI]

He went off to do other things. Jasper Rose said, Well, theat the university in those days, Jasper Rose, who was an artthe years went by. I ran into Jasper Rose one time on Ocean

Rabkin, Sarah

2010-01-01T23:59:59.000Z

411

Jim Nelson, Camp Joy Gardens  

E-Print Network [OSTI]

in properly run educational programs than there is perhaps (third of it is from educational programs, which would be theeducational organization, Camp Joy offers tours and programs

Rabkin, Sarah

2010-01-01T23:59:59.000Z

412

Luke D. Nelson Lance Manuel  

E-Print Network [OSTI]

Laboratories, Albuquerque, NM 87185 Statistical Analysis of Wind Turbine Inflow and Structural Response Data, TX 78712 Herbert J. Sutherland Paul S. Veers Wind Energy Technology Department, Sandia National and struc- tural response data on a modified version of the Micon 65/13 wind turbine at a test site near

Manuel, Lance

413

US ITER Project Brad Nelson  

E-Print Network [OSTI]

power supply in San Giorgio di Piano, Italy #12;FY 2014 Partner Achievements 9/23/14 FESAC ITER Progress Central Solenoid Steady State Electrical Network Tokamak Cooling Water System Toroidal Field Conductor #12 Roughing pumps Pellet injection Tokamak cooling water system Vacuum auxiliary system Ion

414

Electrical properties of a-C:Mo films produced by dual-cathode filtered cathodic arc plasma deposition  

E-Print Network [OSTI]

and Related Materials Electrical properties of a-C:Mo filmsNo. DE-AC02-05CH11231. Electrical properties of a-C:Mo filmsair. Film resistivity and electrical activation energy were

Sansongsiri, Sakon

2008-01-01T23:59:59.000Z

415

Electronic Structure Description of the Cis-MoOS Unit in Models for Molybdenum Hydroxylases  

SciTech Connect (OSTI)

The molybdenum hydroxylases catalyze the oxidation of numerous aromatic heterocycles and simple organics and, unlike other hydroxylases, utilize water as the source of oxygen incorporated into the product. The electronic structures of the cis-MoOS units in CoCp{sub 2}[Tp{sup iPr}Mo{sup V}OS(OPh)] and Tp{sup iPr}Mo{sup VI}OS(OPh) (Tp{sup iPr} = hydrotris(3-isopropylpyrazol-1-yl)borate), new models for molybdenum hydroxylases, have been studied in detail using S K-edge X-ray absorption spectroscopy, vibrational spectroscopy, and detailed bonding calculations. The results show a highly delocalized Mo {double_bond} S {pi}* LUMO redox orbital that is formally Mo(d{sub xy}) with {approx}35% sulfido ligand character. Vibrational spectroscopy has been used to quantitate Mo-S{sub sulfido} bond order changes in the cis-MoOS units as a function of redox state. Results support a redox active molecular orbital that has a profound influence on MoOS bonding through changes to the relative electro/nucleophilicity of the terminal sulfido ligand accompanying oxidation state changes. The bonding description for these model cis-MoOS systems supports enzyme mechanisms that are under orbital control and dominantly influenced by the unique electronic structure of the cis-MoOS site. The electronic structure of the oxidized enzyme site is postulated to play a role in polarizing a substrate carbon center for nucleophilic attack by metal activated water and acting as an electron sink in the two-electron oxidation of substrates.

Doonan, C.J.; Rubie, N.D.; Peariso, K.; Harris, H.H.; Knottenbelt, S.Z.; George, G.N.; Young, C.G.; Kirk, M.L.; /New Mexico U. /Melbourne U. /SLAC, SSRL

2009-04-29T23:59:59.000Z

416

Phase transformation of ZnMoO{sub 4} by localized thermal spike  

SciTech Connect (OSTI)

We show that ZnMoO{sub 4} remains in stable phase under thermal annealing up to 1000?C, whereas it decomposes to ZnO and MoO{sub 3} under transient thermal spike induced by 100?MeV Ag irradiation. The transformation is evidenced by X-ray diffraction (XRD), Raman spectroscopy, and X-ray photoelectron spectroscopy (XPS). Thin films of ZnMoO{sub 4} were synthesized by thermal evaporation and subsequent annealing in oxygen ambient at 600?C for 4?h. XRD results show that as the irradiation fluence increases, the peak related to ZnMoO{sub 4} decreases gradually and eventually disappear, whereas peaks related to ZnO grow steadily up to fluence of 3??10{sup 12} ions/cm{sup 2} and thereafter remain stable till highest fluence. This indicates that polycrystalline ZnMoO{sub 4} film has transformed to polycrystalline ZnO thin film. The Raman lines related to ZnMoO{sub 4} are observed to have disappeared with increasing irradiation fluence. XPS results show modification in bonding and depletion of Mo from near surface region after the ion irradiation. Cross-sectional transmission electron microscopy result shows the formation of ion track of diameter 1216?nm. These results demonstrate that ion beam methods provide the means to control phase splitting of ZnMoO{sub 4} to ZnO and MoO{sub 3} within nanometric dimension along the ion track. The observation of phase splitting and Mo loss are explained in the framework of ion beam induced thermal spike formalism.

Agarwal, D. C.; Avasthi, D. K.; Kabiraj, D. [Inter-University Accelerator Center, Aruna Asaf Ali Marg, New Delhi 110067 (India); Varma, S. [Institute of Physics, Sachivalaya Marg, Bhubaneswar 751005 (India); Kremer, Felipe; Ridgway, M. C. [Australian National University, Canberra ACT 0200 (Australia)

2014-04-28T23:59:59.000Z

417

The Fiber Optic Multiplexed Upgraded Thomson Scattering Diagnostic for the ISTTOK Tokamak  

E-Print Network [OSTI]

The Fiber Optic Multiplexed Upgraded Thomson Scattering Diagnostic for the ISTTOK Tokamak M. P by different length optical fibers used to relay the scattered light to a single spectrometer. 2. Thomson vessel and opposite to the collection lenses. Figure 1 shows the present two fiber optic Thomson

418

Evaluation of Catalysts from Different Origin for Vapor Phase Upgrading in Biomass Pyrolysis  

SciTech Connect (OSTI)

Liquid fuels and chemicals from biomass resources arouse much interests in research and development. Fast pyrolysis of biomass has the potential to effectively change solid biomass materials into liquid products. However, bio-oil from traditional pyrolysis processes is difficult to apply in industry, because of its complicated composition, high oxygen content, low stability, etc. Upgrading or refining of the bio-oil should be performed for industrial application of biomass pyrolysis. Often, the process would be done in a separate reactor downstream of the pyrolysis process. In this paper, a laboratory scale micro test facility was constructed, wherein the pyrolysis of pine and catalytic upgrading of the resulting vapors were closely coupled in one reactor. The composition of vapor effluent was monitored with a molecular beam mass spectrometer (MBMS) for the online evaluation of the catalyst performance. Catalysts from different origin were tested and compared for the effectiveness of pyrolysis vapor upgrading, namely commercial zeolites, Ni based steam reforming catalyst, CaO, MgO, and several laboratory-made catalysts. The reaction temperature for catalytic upgrading varied between 400 and 600 centigrade, and the gaseous residence time ranged from 0.1 second to above 2 second, to simulate the conditions in industrial application. It is revealed that some catalysts are active in transform most of primary biomass pyrolysis vapors into hydrocarbons, resulting in nonoxygenated products, which is beneficial for downstream utilization. Others are not as effective, results in minor improvement compared with blank test results.

Zhang, X.; Mukarakate, C.; Zheng, Z.; Nimlos, M.

2012-01-01T23:59:59.000Z

419

The Reach of CERN LEP2 and Fermilab Tevatron Upgrades for Higgs Bosons in Supersymmetric Models  

E-Print Network [OSTI]

Luminosity upgrades of the Fermilab Tevatron pbar-p collider have been shown to allow experimental detection of a Standard Model (SM) Higgs boson up to $m_{H_{SM}}\\sim 120$ GeV via $WH_{SM} \\to \\ell\

Howard Baer; B. W. Harris; Xerxes Tata

1998-07-06T23:59:59.000Z

420

Large area avalanche photodiode detector array upgrade for a ruby-laser Thomson scattering system  

E-Print Network [OSTI]

Large area avalanche photodiode detector array upgrade for a ruby-laser Thomson scattering system T microchannel plate MCP detector was replaced with an array of modular large area avalanche photodiode detectors-laser head, collection optics, a Jarrell-Ash MonoSpec-27 Model 82-499 spectrometer, and avalanche photodiode

Biewer, Theodore

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Functional design criteria, Project W-059, B Plant Canyon ventilation upgrade  

SciTech Connect (OSTI)

This document outlines the essential functions and requirements to be included in the design of the proposed B Plant canyon exhaust system upgrade. The project will provide a new exhaust air filter system and isolate the old filters from the airstream.

Roege, P.E.

1995-03-02T23:59:59.000Z

422

NSTX Upgrade Project Final Design Review June 22 -24, 2011 1 NSTX Supported by  

E-Print Network [OSTI]

­ Bakeout ­ Gas Injection ­ Cooling Water · Requirements · Description of the Design · Previous Chits, 2011 Cooling Water Requirements · Upgrade 8 OH Flow Paths ­ Existing · Eight (8) OH flow paths @ 1 GPM to equalize temperature of coil conductors · Add local pressure monitoring gage · Add remote pressure

Princeton Plasma Physics Laboratory

423

IMPACT OF TIRE AND AERODYNAMIC AIDS ON TRUCK PERFORMANCE ALONG UPGRADE SECTIONS  

E-Print Network [OSTI]

IMPACT OF TIRE AND AERODYNAMIC AIDS ON TRUCK PERFORMANCE ALONG UPGRADE SECTIONS Hesham Rakha1 and aerodynamics aids on the truck acceleration behavior. The objectives of this paper are two-fold. First of vehicle tires, the vehicle's aerodynamic features, the percentage mass on the tractive axle

Rakha, Hesham A.

424

Top: Rudder Tower is one of 24 Texas A&M buildings undergoing energy efficiency upgrades.  

E-Print Network [OSTI]

Top: Rudder Tower is one of 24 Texas A&M buildings undergoing energy efficiency upgrades. Bottom control energy costs and provide a greener, more energy efficient campus for a more environmentally' building automation system (BAS) will improve energy efficiency and enable better HVAC control in buildings

425

Wind Turbine Shutdowns and Upgrades in Denmark: Timing Decisions and the Impact of Government Policy  

E-Print Network [OSTI]

Wind Turbine Shutdowns and Upgrades in Denmark: Timing Decisions and the Impact of Government structural econometric model of wind turbine owners' decisions about whether and when to add new turbines the underlying profit structure for wind producers and evaluate the impact of technology and government policy

Lin, C.-Y. Cynthia

426

SOLAR UPGRADE OF METHANE USING DRY REFORMING IN DIRECT CONTACT BUBBLE REACTOR  

E-Print Network [OSTI]

process of a solar reformer of dry methane reforming was proposed to operate in a temperature range of 600SOLAR UPGRADE OF METHANE USING DRY REFORMING IN DIRECT CONTACT BUBBLE REACTOR Khalid Al-Ali 1 including lower melting point, thermal and chemical stability, acting simultaneously as heat transport

Paris-Sud XI, Universit de

427

Fabrication and Testing Status of CEBAF 12 GeV Upgrade Cavities  

SciTech Connect (OSTI)

The 12 GeV upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) is under way. All cavities have been built by industry and are presently undergoing post-processing and final low and high power qualification before cryomodule assembly. The status is reported including fabrication-related experiences, observations and issues throughout production, post-processing and qualification.

Marhauser, F; Davis, G K; Forehand, D; Grenoble, C; Hogan, J; Overton, R B; Reilly, A V; Rimmer, R A

2011-09-01T23:59:59.000Z

428

Evaluation of solvent-based in situ processes for upgrading and recovery of heavy oil bitumen  

SciTech Connect (OSTI)

Solvent-based in situ recovery processes have been proposed as lower cost alternatives to thermal processes for recovery of heavy oil and bitumen. Advantages of solvent based processes are: reduced steam requirements, reduced water treating, and in situ upgrading of the produced oil. Lab results and process calculations show that low-pressure, low-energy solvent-based in situ processes have considerable technical and economic potential for upgrading and recovery of bitumen and heavy oil. In a lab flow test using Athabasca tar sand and propane as solvent, 50 percent of the bitumen was recovered as upgraded oil. Relative to the raw bitumen, API gravity increased by about 10{degrees}API, viscosity was reduced 30-fold, sulfur content was reduced about 50 percent, and metals content was also substantially reduced. Process uncertainties that will have a major impact on economics are: (1) oil production rate, (2) oil recovery, (3) extent of in situ upgrading, and (4) solvent losses. Additional lab development and field testing are required to reduce these process uncertainties and to predict commercial-scale economics.

Duerksen, J.H.; Eloyan, A. [Chevron Petroleum Technology Co., La Habra, CA (United States)

1995-12-31T23:59:59.000Z

429

ATLAS Tracker Upgrade: Silicon Strip Detectors for the sLHC  

E-Print Network [OSTI]

ATLAS Tracker Upgrade: Silicon Strip Detectors for the sLHC Sergey Burdin (University of Liverpool) for ATLAS Collaboration 13th ISTC SAC Seminar "New Perspectives of High Energy Physics" 1-5 September, 2010 2021 Commission new detectors Apr 2021 - Jun 2021 Take data July 2021 3 Sep 2010 2S.Burdin / Atlas

430

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Irradiation Results and Transmission on  

E-Print Network [OSTI]

Power vs Dosage all VCSELs still produce optical power at SLHC dosage should irradiate at lower Workshop 14 Post-Irradiation Analysis all arrays except ULM 5 G still produce optical power post-irradiationK.K. Gan ATLAS Tracker Upgrade Workshop 1 Irradiation Results and Transmission on Small Cables

Gan, K. K.

431

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Summary of Optical Link R&D  

E-Print Network [OSTI]

-Hardness of Optical Fiber Corning Infinicor GRIN fiber irradiated with 's from Co60 Attenuation parameterized into optical signal for transmission in fibers PINs convert optical signal into electrical signal PlanK.K. Gan ATLAS Tracker Upgrade Workshop 1 Summary of Optical Link R&D K.K. Gan The Ohio State

Gan, K. K.

432

Development of Hydrothermal Liquefaction and Upgrading Technologies for Lipid-Extracted Algae Conversion to Liquid Fuels  

SciTech Connect (OSTI)

Bench-scale tests were performed for lipid-extracted microalgae (LEA) conversion to liquid fuels via hydrotreating liquefaction (HTL) and upgrading processes. Process simulation and economic analysis for a large-scale LEA HTL and upgrading system were developed based on the best available test results. The system assumes an LEA feed rate of 608 dry metric ton/day and that the feedstock is converted to a crude HTL bio-oil and further upgraded via hydrotreating and hydrocracking to produce liquid hydrocarbon fuels, mainly alkanes. Performance and cost results demonstrate that HTL would be an effective option to convert LEA to liquid fuel. The liquid fuels annual yield was estimated to be 26.9 million gallon gasoline-equivalent and the overall energy efficiency at higher heating value basis was estimated to be 69.5%. The minimum fuel selling price (MFSP) was estimated to be $0.75/L with LEA feedstock price at $33.1 metric ton at dry basis and 10% internal rate of return. A sensitivity analysis indicated that the largest effects to production cost would come from the final products yields and the upgrading equipments cost. The impact of plant scale on MFSP was also investigated.

Zhu, Yunhua; Albrecht, Karl O.; Elliott, Douglas C.; Hallen, Richard T.; Jones, Susanne B.

2013-10-01T23:59:59.000Z

433

Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)  

SciTech Connect (OSTI)

The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454.

Gilbert, J.L.

1998-07-23T23:59:59.000Z

434

Magnetic Diagnostics For Equilibrium Reconstruction And Realtime Plasma Control In NSTX-Upgrade  

SciTech Connect (OSTI)

This paper describes aspects of magnetic diagnostics for realtime control in NSTX-U. The sensor arrangement on the upgraded center column is described. New analog and digital circuitry for processing the plasma current rogowski data are presented. An improved algorithm for estimating the plasma vertical velocity for feedback control is presented.

Gerhardt, Stefan P. [PPPL; Erickson, Keith [PPPL; Kaita, Robert [PPPL; Lawson, John [PPPL; Mozulay, Robert [PPPL; Mueller, Dennis [PPPL; Que, Weiguo [PPPL; Rahman, Nabidur [PPPL; Schneider, Hans [PPPL; Smalley, Gustav [PPPL; Tresemer, Kelsey [PPPL

2014-06-01T23:59:59.000Z

435

Superconducting link bus design for the accelerator project for upgrade of LHC  

SciTech Connect (OSTI)

The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.; /Fermilab

2011-06-01T23:59:59.000Z

436

Superconducting link bus design for the accelerator project for upgrade of LHC  

SciTech Connect (OSTI)

The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.; /Fermilab

2010-08-01T23:59:59.000Z

437

ASDEX-UPGRADE TOKAMAK EMULATOR FOR TEST OF CONTROL SYSTEM AND SHOT PROGRAMME  

E-Print Network [OSTI]

nuclear can be tested and verified. With this testing of the fusion as a data source and its discharge for controlled nuclear fusion. Its main component is a vacuum vessel, in torus shape, in which the plasma is keptASDEX-UPGRADE TOKAMAK EMULATOR FOR TEST OF CONTROL SYSTEM AND SHOT PROGRAMME H. Richter, R.H. Cole

Zachmann, Gabriel

438

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Broader source: Energy.gov [DOE]

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

439

REACTION MECHANISMS IN PETROLEUM: FROM EXPERIMENTATION TO UPGRADING AND GEOLOGICAL CONDITIONS  

E-Print Network [OSTI]

deep seated, high pressure-high temperature reservoirs, tar sands or oil shales. In deep seated that arise concerning the exploitation of petroleum from unconventional reservoirs, lie the questions of the composition of hydrocarbons present in deep seated HP-HT reservoirs or produced during in-situ upgrading steps

Paris-Sud XI, Université de

440

HYBRID SULFUR RECOVERY PROCESS FOR NATURAL GAS UPGRADING  

SciTech Connect (OSTI)

This final report describes the objectives, technical approach, results and conclusions for a project funded by the U.S. Department of Energy to test a hybrid sulfur recovery process for natural gas upgrading. The process concept is a configuration of CrystaTech, Inc.'s CrystaSulf{reg_sign} process which utilizes a direct oxidation catalyst upstream of the absorber tower to oxidize a portion of the inlet hydrogen sulfide (H{sub 2}S) to sulfur dioxide (SO{sub 2}) and elemental sulfur. This hybrid configuration of CrystaSulf has been named CrystaSulf-DO and represents a low-cost option for direct treatment of natural gas streams to remove H{sub 2}S in quantities equivalent to 0.2-25 metric tons (LT) of sulfur per day and more. This hybrid process is projected to have lower capital and operating costs than the competing technologies, amine/aqueous iron liquid redox and amine/Claus/tail gas treating, and have a smaller plant footprint, making it well suited to both onshore and offshore applications. CrystaSulf is a nonaqueous sulfur recovery process that removes H{sub 2}S from gas streams and converts it to elemental sulfur. In CrystaSulf, H{sub 2}S in the inlet gas is reacted with SO{sub 2} to make elemental sulfur according to the liquid phase Claus reaction: 2H{sub 2}S + SO{sub 2} {yields} 2H{sub 2}O + 3S. The SO{sub 2} for the reaction can be supplied from external sources by purchasing liquid SO{sub 2} and injecting it into the CrystaSulf solution, or produced internally by converting a portion of the inlet gas H{sub 2}S to SO{sub 2} or by burning a portion of the sulfur produced to make SO{sub 2}. CrystaSulf features high sulfur recovery similar to aqueous-iron liquid redox sulfur recovery processes, but differs from the aqueous processes in that CrystaSulf controls the location where elemental sulfur particles are formed. In the hybrid process, the needed SO{sub 2} is produced by placing a bed of direct oxidation catalyst in the inlet gas stream to oxidize a portion of the inlet H{sub 2}S. Oxidation catalysts may also produce some elemental sulfur under these conditions, which can be removed and recovered prior to the CrystaSulf absorber. The CrystaSulf-DO process can utilize direct oxidation catalyst from many sources. Numerous direct oxidation catalysts are available from many suppliers worldwide. They have been used for H{sub 2}S oxidation to sulfur and/or SO{sub 2} for decades. It was believed at the outset of the project that TDA Research, Inc., a subcontractor, could develop a direct oxidation catalyst that would offer advantages over other commercially available catalysts for this CrystaSulf-DO process application. This project involved the development of several of TDA's candidate proprietary direct oxidation catalysts through laboratory bench-scale testing. These catalysts were shown to be effective for conversion of H{sub 2}S to SO{sub 2} and to elemental sulfur under certain operating conditions. One of these catalysts was subsequently tested on a commercial gas stream in a bench-scale reactor at CrystaTech's pilot plant site in west Texas with good results. However, commercial developments have precluded the use of TDA catalysts in the CrystaSulf-DO process. Nonetheless, this project has advanced direct oxidation catalyst technology for H{sub 2}S control in energy industries and led to several viable paths to commercialization. TDA is commercializing the use of its direct oxidation catalyst technology in conjunction with the SulfaTreat{reg_sign} solid scavenger for natural gas applications and in conjunction with ConocoPhillips and DOE for gasification applications using ConocoPhillips gasification technology. CrystaTech is commercializing its CrystaSulf-DO process in conjunction with Gas Technology Institute for natural gas applications (using direct oxidation catalysts from other commercial sources) and in conjunction with ChevronTexaco and DOE for gasification applications using ChevronTexaco's gasification technology.

Dennis Dalrymple

2004-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Pyrolysis of Woody Residue Feedstocks: Upgrading of Bio-Oils from Mountain-Pine-Beetle-Killed Trees and Hog Fuel  

SciTech Connect (OSTI)

Liquid transportation fuel blend-stocks were produced by pyrolysis and catalytic upgrading of woody residue biomass. Mountain pine beetle killed wood and hog fuel from a saw mill were pyrolyzed in a 1 kg/h fluidized bed reactor and subsequently upgraded to hydrocarbons in a continuous fixed bed hydrotreater. Upgrading was performed by catalytic hydrotreatment in a two-stage bed at 170C and 405C with a per bed LHSV between 0.17 and 0.19. The overall yields from biomass to upgraded fuel were similar for both feeds: 24-25% despite the differences in bio-oil (intermediate) mass yield. Pyrolysis bio-oil mass yield was 61% from MPBK wood, and subsequent upgrading of the bio-oil gave an average mass yield of 41% to liquid fuel blend stocks. Hydrogen was consumed at an average of 0.042g/g of bio-oil fed, with final oxygen content in the product fuel ranging from 0.31% to 1.58% over the course of the test. Comparatively for hog fuel, pyrolysis bio-oil mass yield was lower at 54% due to inorganics in the biomass, but subsequent upgrading of that bio-oil had an average mass yield of 45% to liquid fuel, resulting in a similar final mass yield to fuel compared to the cleaner MPBK wood. Hydrogen consumption for the hog fuel upgrading averaged 0.041 g/g of bio-oil fed, and the final oxygen content of the product fuel ranged from 0.09% to 2.4% over the run. While it was confirmed that inorganic laded biomass yields less bio-oil, this work demonstrated that the resultant bio-oil can be upgraded to hydrocarbons at a higher yield than bio-oil from clean wood. Thus the final hydrocarbon yield from clean or residue biomass pyrolysis/upgrading was similar.

Zacher, Alan H.; Elliott, Douglas C.; Olarte, Mariefel V.; Santosa, Daniel M.; Preto, Fernando; Iisa, Kristiina

2014-12-01T23:59:59.000Z

442

Investigation of the optical properties of MoS{sub 2} thin films using spectroscopic ellipsometry  

SciTech Connect (OSTI)

Spectroscopic ellipsometry (SE) characterization of layered transition metal dichalcogenide (TMD) thin films grown by vapor phase sulfurization is reported. By developing an optical dispersion model, the extinction coefficient and refractive index, as well as the thickness of molybdenum disulfide (MoS{sub 2}) films, were extracted. In addition, the optical band gap was obtained from SE and showed a clear dependence on the MoS{sub 2} film thickness, with thinner films having a larger band gap energy. These results are consistent with theory and observations made on MoS{sub 2} flakes prepared by exfoliation, showing the viability of vapor phase derived TMDs for optical applications.

Yim, Chanyoung; O'Brien, Maria; Winters, Sinad [School of Chemistry, Trinity College Dublin, Dublin 2 (Ireland); Centre for Research on Adaptive Nanostructures and Nanodevices (CRANN), Trinity College Dublin, Dublin 2 (Ireland); McEvoy, Niall [Centre for Research on Adaptive Nanostructures and Nanodevices (CRANN), Trinity College Dublin, Dublin 2 (Ireland); Mirza, Inam; Lunney, James G. [Centre for Research on Adaptive Nanostructures and Nanodevices (CRANN), Trinity College Dublin, Dublin 2 (Ireland); School of Physics, Trinity College Dublin, Dublin 2 (Ireland); Duesberg, Georg S., E-mail: duesberg@tcd.ie [School of Chemistry, Trinity College Dublin, Dublin 2 (Ireland); Centre for Research on Adaptive Nanostructures and Nanodevices (CRANN), Trinity College Dublin, Dublin 2 (Ireland); Advanced Materials and BioEngineering Research (AMBER) Centre, Trinity College Dublin, Dublin 2 (Ireland)

2014-03-10T23:59:59.000Z

443

Density functional theory investigation of the electronic structure and thermoelectric properties of layered MoS{sub 2}, MoSe{sub 2} and their mixed-layer compound  

SciTech Connect (OSTI)

First principles density functional theory calculations were carried out for the 2H-MoQ{sub 2} (Q=S and Se) and their hypothetical mixed-layer compound. Due to the different electronegativities of S and Se atoms on MoQ{sub 2}, the band gap size could be adjusted in mixed-layer compound MoS{sub 2}/MoSe{sub 2}. Also, the indirect band gap in pure MoQ{sub 2} compounds is changed to the pseudo direct band gap in mixed-layer MoS{sub 2}/MoSe{sub 2} which is similar to the monolayer compound. The layer mixing enhances the thermoelectric properties because of the increased density of states around the Fermi level and the decreased band gap size. Therefore, we suggest that this layer mixing approach should be regarded as a useful way to modulate their electronic structures and to improve their thermoelectric properties. -- Graphical abstract: On the basis of density functional calculations we predict that the mixed-layer compounds 2H-MoS{sub 2}/2H-MoSe{sub 2}, in which two different layers 2H-MoS{sub 2} and 2H-MoSe{sub 2}, have enhanced thermoelectric properties because of the increased density of states around the Fermi level and the decreased band gap size. Highlights: We explored a way of improving TE properties of 2H-MoQ{sub 2} on DFT methods. The mixed-layer compounds MoS{sub 2}/MoSe{sub 2} have enhanced thermoelectric properties. This is caused by modulated electronic structure of mixed layer compound. Layer mixing approach should be regarded as a useful way to improve TE properties.

Lee, Changhoon; Hong, Jisook [Department of Chemistry, Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of); Lee, Wang Ro [Faculty of Liberal Education, Chonbuk National University, Jeonju, Jeonbuk 561-756 (Korea, Republic of); Kim, Dae Yeon [Agency for Defense Development (ADD), Chinhae, Kyungnam 645-600 (Korea, Republic of); Shim, Ji Hoon, E-mail: jhshim@postech.ac.kr [Department of Chemistry, Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of); Divisions of Advanced Nuclear Engineering, Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of)

2014-03-15T23:59:59.000Z

444

High damage-resistant Mo mirror for high-power TEA CO/sub 2/ laser systems  

SciTech Connect (OSTI)

A high-purity molybdenum (Mo) mirror was developed by an electron-beam melting method (e.b.m. Mo mirror). For high-power TEA CO/sub 2/ laser, the e.b.m. Mo mirror has two to four times higher surface damage threshold than that of an Au-coated glass mirror and three times longer lifetime than that of a powder metallurgy Mo mirror (p.m. Mo mirror) when laser energy density lower than 60 J/cm/sup 2/ was irradiated with a 0.5-pps repetition rate. It was found that the difference between the e.b.m. Mo mirror and the p.m. Mo mirror at the laser-damage threshold was due to the five surface without voids and the small amount of impurities.

Ichikawa, Y.; Yoshida, K.; Tsunawaki, Y.; Yamanaka, M.; Yamanaka, T.; Yamanaka, C.; Okamoto, H.; Matsusue, N.; Kitajima, K.

1987-09-01T23:59:59.000Z

445

Aboveground test of an advanced Li$_2$MoO$_4$ scintillating bolometer to search for neutrinoless double beta decay of $^{100}$Mo  

E-Print Network [OSTI]

Large lithium molybdate (Li$_2$MoO$_4$) crystal boules were produced by using the low thermal gradient Czochralski growth technique from deeply purified molybdenum. A small sample from one of the boules was preliminary characterized in terms of X-ray-induced and thermally-excited luminescence. A large cylindrical crystalline element (with a size of $\\oslash 40\\times40$ mm) was used to fabricate a scintillating bolometer, which was operated aboveground at $\\sim 15$ mK by using a pulse-tube cryostat housing a high-power dilution refrigerator. The excellent detector performance in terms of energy resolution and $\\alpha$ background suppression along with preliminary positive indications on the radiopurity of this material show the potentiality of Li$_2$MoO$_4$ scintillating bolometers for low-counting experiment to search for neutrinoless double beta decay of $^{100}$Mo.

T. B. Bekker; N. Coron; F. A. Danevich; V. Ya. Degoda; A. Giuliani; V. D. Grigorieva; N. V. Ivannikova; M. Mancuso; P. de Marcillac; I. M. Moroz; C. Nones; E. Olivieri; G. Pessina; D. V. Poda; V. N. Shlegel; V. I. Tretyak; M. Velazquez

2014-12-17T23:59:59.000Z

446

Aboveground test of an advanced Li$_2$MoO$_4$ scintillating bolometer to search for neutrinoless double beta decay of $^{100}$Mo  

E-Print Network [OSTI]

Large lithium molybdate (Li$_2$MoO$_4$) crystal boules were produced by using the low thermal gradient Czochralski growth technique from deeply purified molybdenum. A small sample from one of the boules was preliminary characterized in terms of X-ray-induced and thermally-excited luminescence. A large cylindrical crystalline element (with a size of $\\oslash 40\\times40$ mm) was used to fabricate a scintillating bolometer, which was operated aboveground at $\\sim 15$ mK by using a pulse-tube cryostat housing a high-power dilution refrigerator. The excellent detector performance in terms of energy resolution and $\\alpha$ background suppression along with preliminary positive indications on the radiopurity of this material show the potentiality of Li$_2$MoO$_4$ scintillating bolometers for low-counting experiment to search for neutrinoless double beta decay of $^{100}$Mo.

Bekker, T B; Danevich, F A; Degoda, V Ya; Giuliani, A; Grigorieva, V D; Ivannikova, N V; Mancuso, M; de Marcillac, P; Moroz, I M; Nones, C; Olivieri, E; Pessina, G; Poda, D V; Shlegel, V N; Tretyak, V I; Velazquez, M

2014-01-01T23:59:59.000Z

447

First bolometric measurement of the two neutrino double beta decay of $^{100}$Mo with a ZnMoO$_4$ crystals array  

E-Print Network [OSTI]

The large statistics collected during the operation of a ZnMoO$_4$ array, for a total exposure of 1.3 kg $\\cdot$ day of $^{100}$Mo, allowed the first bolometric observation of the two neutrino double beta decay of $^{100}$Mo. The observed spectrum of each crystal was reconstructed taking into account the different background contributions due to environmental radioactivity and internal contamination. The analysis of coincidences between the crystals allowed the assignment of constraints to the intensity of the different background sources, resulting in a reconstruction of the measured spectrum down to an energy of $\\sim$300 keV. The half-life extracted from the data is T$_{1/2}^{2\

L. Cardani; L. Gironi; N. Ferreiro Iachellini; L. Pattavina; J. W. Beeman; F. Bellini; N. Casali; O. Cremonesi; I. Dafinei; S. Di Domizio; F. Ferroni; E. Galashov; C. Gotti; S. Nagorny; F. Orio; G. Pessina; G. Piperno; S. Pirro; E. Previtali; C. Rusconi; C. Tomei; M. Vignati

2014-04-30T23:59:59.000Z

448

Precipitation behavior of Ni-Cr-22 Fe-18 Mo (Hastelloy-X) and Ni-Cr-22 Co-12 Mo (Inconel-617) after isothermal aging  

SciTech Connect (OSTI)

The precipitation behavior of the nickel-base alloys Ni-Cr-22Fe-18Mo (Hastelloy-X) and Ni-Cr-22Co12Mo (Inconel-617) has been investigated as a function of aging temperature. Hastelloy-X shows that M/sub 6/C and TiN are primary precipitates and M/sub 12/C, A/sub 3/B/sub 2/ (approx. = Fe/sub 3/Mo/sub 2/), and M/sub 23/C/sub 6/ are secondary precipitates, while Inconel-617 also has M/sub 6/C and TiN as primary precipitates and M/sub 23/C/sub 6/, M/sub 12/C, and Ni/sub 3/AlTi as secondary precipitates. The characterization has been carried out by metallographic and transmission electron microscopy investigations and by x-ray examinations of electrochemical isolated precipitates.

Kirchhofer, H.; Nickel, H.; Schubert, F.

1984-07-01T23:59:59.000Z

449

Electrochemical Testing of Ni-Cr-Mo-Gd Alloys  

SciTech Connect (OSTI)

The waste package site recommendation design specified a boron-containing stainless steel, Neutronit 976/978, for fabrication of the internal baskets that will be used as a corrosion-resistant neutron-absorbing material. Recent corrosion test results gave higher-than-expected corrosion rates for this material. The material callout for these components has been changed to a Ni-Cr-Mo-Gd alloy (ASTM-B 932-04, UNS N06464) that is being developed at the Idaho National Laboratory. This report discusses the results of initial corrosion testing of this material in simulated in-package environments that could contact the fuel baskets after breach of the waste package outer barrier. The corrosion test matrix was executed using the potentiodynamic and potentiostatic electrochemical test techniques. The alloy performance shows low rates of general corrosion after initial removal of a gadolinium-rich second phase that intersects the surface. The high halide-containing test solutions exhibited greater tendencies toward initiation of crevice corrosion.

T. E. Lister; R. E. Mizia; H. Tian

2005-10-01T23:59:59.000Z

450

E-Print Network 3.0 - aceros al cr-mo-v Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

G. F. Janssens, Dierk Raabe, Ernst Kozeschnik, Mark A. Miodownik, Summary: , ,,Dissimilar 2.25Cr-9Cr and 2Cr-0.5CrMoV steel welds, I. Characterisation of the weld zone and...

451

Growth and crystal structure of binary molybdate CsFe(MoO{sub 4}){sub 2}  

SciTech Connect (OSTI)

CsFe(MoO{sub 4}){sub 2} single crystals have been grown by solution-melt crystallization with a charge-to-solvent ratio of 1: 3 (with Cs{sub 2}Mo{sub 3}O{sub 10} used as a solvent). The crystal structure of this compound has been refined by X-ray diffraction (X8 APEX automatic diffractometer, MoK{sub {alpha}} radiation, 356 F(hkl), R = 0.0178). The trigonal unit cell has the following parameters: a = b = 5.6051(2) A, c = 8.0118(4) A, V = 217.985(15) A{sup 3}, Z = 1, {rho}{sub calc} = 3.875 g/cm{sup 3}, and sp. gr. P3-barm1. The structure is composed of alternating layers of FeO{sub 6} octahedra (with MoO{sub 4} tetrahedra attached by sharing vertices) and CsO{sub 12} icosahedra.

Bazarov, B. G., E-mail: jbaz@binm.bscnet.ru; Namsaraeva, T. V. [Russian Academy of Sciences, Baikal Institute of Nature Management, Siberian Branch (Russian Federation); Klevtsova, R. F., E-mail: klev@che.nsk.su; Anshits, A. G. [Russian Academy of Sciences, Institute of Inorganic Chemistry, Siberian Branch (Russian Federation); Vereshchagina, T. A. [Russian Academy of Sciences, Institute of Chemistry and Chemical Technology, Siberian Branch (Russian Federation); Glinskaya, L. A. [Russian Academy of Sciences, Institute of Inorganic Chemistry, Siberian Branch (Russian Federation); Fedorov, K. N.; Bazarova, Zh. G. [Russian Academy of Sciences, Baikal Institute of Nature Management, Siberian Branch (Russian Federation)

2010-07-15T23:59:59.000Z

452

Combining sedimentological, trace metal (Mn, Mo) and molecular evidence for reconstructing past water-column  

E-Print Network [OSTI]

Combining sedimentological, trace metal (Mn, Mo) and molecular evidence for reconstructing past online 22 June 2013 Abstract Here, we present sedimentological, trace metal, and molecular evidence underscores the value of combining sedimentological, geochemical, and microbiological approaches

Wehrli, Bernhard

453

Monolayers of MoS{sub 2} as an oxidation protective nanocoating material  

SciTech Connect (OSTI)

First-principle calculations are employed to investigate the interaction of oxygen with ideal and defective MoS{sub 2} monolayers. Our calculations show that while oxygen atoms are strongly bound on top of sulfur atoms, the oxygen molecule only weakly interacts with the surface. The penetration of oxygen atoms and molecules through a defect-free MoS{sub 2} monolayer is prevented by a very high diffusion barrier indicating that MoS{sub 2} can serve as a protective layer for oxidation. The analysis is extended to WS{sub 2} and similar coating characteristics are obtained. Our calculations indicate that ideal and continuous MoS{sub 2} and WS{sub 2} monolayers can improve the oxidation and corrosion-resistance of the covered surface and can be considered as an efficient nanocoating material.

Sen, H. Sener [UNAM-National Nanotechnology Research Center, Bilkent University, Ankara 06800 (Turkey); Sahin, H.; Peeters, F. M. [Department of Physics, University of Antwerp, 2610 Antwerp (Belgium); Durgun, E., E-mail: durgun@unam.bilkent.edu.tr [UNAM-National Nanotechnology Research Center, Bilkent University, Ankara 06800 (Turkey); Institute of Materials Science and Nanotechnology, Bilkent University, Ankara 06800 (Turkey)

2014-08-28T23:59:59.000Z

454

Electronic structure and conductivity of nanocomposite metal (Au,Ag,Cu,Mo)-containing amorphous carbon films  

E-Print Network [OSTI]

dual-cathode arc deposition (PDC-FCVA) source containingand metal cathodes [2]. The PDC-FCVA system in combinationCu,Mo) incorporation in a-C by PDC-FCVA. The modification of

Endrino, Jose L.

2010-01-01T23:59:59.000Z

455

Atomistic simulation of the electronic states of adatoms in monolayer MoS{sub 2}  

SciTech Connect (OSTI)

Using an ab initio density functional theory based electronic structure method, we study the effects of adatoms on the electronic properties of monolayer transition metal dichalcogenide Molybdenum-disulfide (MoS{sub 2}). We consider the 1st (Li, Na, K) and 7th (F, Cl, Br) column atoms and metals (Sc, Ti, Ta, Mo, Pd, Pt, Ag, Au). Three high symmetry sites for the adatom on the surface of monolayer MoS{sub 2} are examined as starting points to search for the most energetically stable configuration for each adatom-monolayer MoS{sub 2} system, as well as the type of associated bonding. For the most stable adatom positions, we characterize the emergence of adatom-induced electronic states including any dopant states.

Chang, Jiwon; Larentis, Stefano; Tutuc, Emanuel; Register, Leonard F.; Banerjee, Sanjay K. [Microelectronics Research Center, The University of Texas at Austin, Austin, Texas 78758 (United States)

2014-04-07T23:59:59.000Z

456

AB INITIO Modeling of Thermomechanical Properties of Mo-Based Alloys for Fossil Energy Conversion  

SciTech Connect (OSTI)

In this final scientific/technical report covering the period of 3.5 years started on July 1, 2011, we report the accomplishments on the study of thermo-mechanical properties of Mo-based intermetallic compounds under NETL support. These include computational method development, physical properties investigation of Mo-based compounds and alloys. The main focus is on the mechanical and thermo mechanical properties at high temperature since these are the most crucial properties for their potential applications. In particular, recent development of applying ab initio molecular dynamic (AIMD) simulations to the T1 (Mo{sub 5}Si{sub 3}) and T2 (Mo{sub 5}SiB{sub 2}) phases are highlighted for alloy design in further improving their properties.

Ching, Wai-Yim

2013-12-31T23:59:59.000Z

457

Enhanced absorption of monolayer MoS{sub 2} with resonant back reflector  

SciTech Connect (OSTI)

The optical absorption of monolayer MoS{sub 2} on top of one-dimensional photonic crystal (1DPC) or metal films with spacer layers is theoretically investigated by extracting the permittivity of monolayer MoS{sub 2} from existing experimental results [K. F. Mak et al., Phys. Rev. Lett. 105, 136805 (2010)]. The absorption of graphene with 1DPC across a broad spectral range is substantially enhanced because of the photonic localization at the optical micro-cavity on top of the 1DPC or metal films. The absorption of monolayer MoS{sub 2} can be tuned by varying either the distance between the monolayer MoS{sub 2} and the back reflector or the thickness of the cover layers.

Liu, Jiang-Tao, E-mail: jtliu@semi.ac.cn; Liu, Nian-Hua [Nanoscale Science and Technology Laboratory, Institute for Advanced Study, Nanchang University, Nanchang 330031 (China); Department of Physics, Nanchang University, Nanchang 330031 (China); Wang, Tong-Biao [Department of Physics, Nanchang University, Nanchang 330031 (China); Li, Xiao-Jing [College of Physics and Energy, Fujian Normal University, Fuzhou 350007 (China)

2014-05-21T23:59:59.000Z

458

A Carbon Molecular Sieve-based Catalyst with Encapsulated Ruthenium Nanoparticles for Bio-oil Stabilization and Upgrading  

E-Print Network [OSTI]

Pyrolysis oil derived from biomass (bio-oil) is regarded as a potential substitute for petroleum crude for producing environmentally friendly fuels of the future. However, pyrolysis oil upgrading still remains an issue due to its complex composition...

Mironenko, Alexander

2012-08-31T23:59:59.000Z

459

Upgrading of substandard housing in Portugal : planning strategies for the technical improvement of marginal settlements, case study, the Casal Ventoso  

E-Print Network [OSTI]

The primary scope of this thesis is to deal, from a technical standpoint, with the implementation of the upgrading concept in marginal settlements in Portugal. It consists mainly of two parts: The rationale of the concept, ...

De Castello-Branco, Fernando N. B

1983-01-01T23:59:59.000Z

460

7.0 References Davidson, J. R. 1995. ELIPGRID-PC: Upgraded Version. ORNL/TM-13103, Oak Ridge National  

E-Print Network [OSTI]

7.0 References Davidson, J. R. 1995. ELIPGRID-PC: Upgraded Version. ORNL/TM-13103, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Gilbert, R.O., J. E. Wilson, B. A. Pulsipher, N. L. Hassig

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The 1,000 dollar home : a scalable business model to build disaster relief dwellings and upgrade slums  

E-Print Network [OSTI]

This thesis proposes a new model for the private markets to build disaster relief dwellings or to upgrade degraded neighborhoods of very low income communities. The study offers a way to empower the dwellers of very poor ...

Cazio, Luis (Del Cazio)

2006-01-01T23:59:59.000Z

462

Process model and capacity upgrades of the CTI-4000 liquid helium coldbox  

SciTech Connect (OSTI)

Fermi National Accelerator Laboratory (FNAL) is in the process of re-commissioning a vintage CTI-4000 liquid helium coldbox, initially supplied by CTI-Cryogenics/Sulzer to Los Alamos in 1979. The coldbox was originally designed as a liquid helium refrigerator with capacity of ?1200 W at nominal 4-K. The process utilized LN{sub 2} precooling, in-series operation of two centrifugal gas bearing turboexpanders and final Joule-Thomson (J-T) expansion. At FNAL, the coldbox will be utilized as a liquefier to support 2-K operations. A process model was developed to aid in the upgrade decisions and used to determine the nominal capacity of the liquefier. Capacity upgrades are achieved by safely utilizing the internal LN2 precooler, the addition of a 3-inch reciprocating wet expansion engine and increasing the overall process pressure by recertifying two limiting pressure vessels to a higher MAWP.

Hansen, Benjamin; Klebaner, Arkadiy [Fermilab, P.O. Box 500, Batavia, IL 60510 (United States); Quack, Hans [Technische Universitaet Dresden, Dresden (Germany)

2014-01-29T23:59:59.000Z

463

Design of a real-time two-color interferometer for MAST Upgrade  

SciTech Connect (OSTI)

A single chord two-color CO{sub 2}/HeNe (10.6/0.633 ?m) heterodyne laser interferometer has been designed to measure the line integral electron density along the mid-plane of the MAST Upgrade tokamak, with a typical error of 1 10{sup 18} m{sup ?3} (?2 phase error) at 4 MHz temporal resolution. To ensure this diagnostic system can be restored from any failures without stopping MAST Upgrade operations, it has been located outside of the machine area. The final design and initial testing of this system, including details of the optics, vibration isolation, and a novel phase detection scheme are discussed in this paper.

OGorman, T., E-mail: thomas.ogorman@ccfe.ac.uk; Naylor, G.; Scannell, R.; Cunningham, G.; Martin, R.; Croft, D. [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Brunner, K. J. [Centre for Advanced Instrumentation, Department of Physics, Durham University, DH1 3LE (United Kingdom)

2014-11-15T23:59:59.000Z

464

Thermal performance upgrade of the Arkansas Nuclear One cooling tower: A ``root cause`` analysis approach  

SciTech Connect (OSTI)

The thermal performance efficiency of the natural draft cooling tower at Entergy Operations` 858 MWe Arkansas Nuclear One, Unit 2 was successfully upgraded to 101% of design performance capability in April 1994 as the end result of a unique root-cause analysis of the cooling tower`s long-standing performance deficiencies. Through application of state-of-the-art diagnostic testing methods and computer modeling techniques, Entergy was able to identify and correct air/water maldistribution problems in the 447 foot tall counterflow cooling tower at minimal cost. Entergy estimates that the savings realized, as a result of the 1.2 F reduction in cooling tower outlet water temperature, will pay for the thermal upgrade project in approximately 14 months.

Liffick, G.W. [Entergy Operations, Inc., Russellville, AR (United States); Cooper, J.W. Jr. [John Cooper and Associates, Tampa, FL (United States)

1995-10-01T23:59:59.000Z

465

Upgrade of the neutral particle analyzers for the TJ-II stellarator  

SciTech Connect (OSTI)

The TJ-II stellarator, a magnetically confined plasma device, is equipped with a broad range of diagnostics for plasma characterization. These include 4 neutral particle analyzers (NPAs), consisting of two Acord-12's, to perform poloidal measurements, plus a compact NPA, and an Acord-24, these in tangential viewing positions. The Acord-12's were originally equipped with two rows of 6 channels each, one for hydrogen neutrals and the other for deuterium neutrals but were changed to a single row of 12 detectors for hydrogen, the principal working gas in TJ-II. With this upgrade the resultant improved energy resolution spectrum has allowed more reliable ion temperature estimates to be obtained. Here we present the upgrades undertaken and present results to demonstrate the improved performance of this diagnostic.

Fontdecaba, J. M., E-mail: josepmaria.fontdecaba@ciemat.es; Ros, A.; McCarthy, K. J. [Laboratorio Nacional de Fusin, CIEMAT, Madrid 28040 (Spain); Petrov, S. Ya.; Nesenevich, V. G.; Chernyshev, F. V. [Ioffe Physical-Technical Institute, Saint Petersburg 194024 (Russian Federation); Barcala, J. M. [Departamento de Electrnica, CIEMAT, Madrid 28040 (Spain)

2014-11-15T23:59:59.000Z

466

Software strategies and hardware upgrades to the PPL data acquisition system (DAS)  

SciTech Connect (OSTI)

This paper describes upgrades to the Data Acquisition System for the Experimental Projects Department at PPL, especially in support of the PBX-M upgrade to be completed this year. Hardware and software maintenance problems with the old configuration, consisting of a DEC KL-10 and eight PDP-11's, are described. The real-time software and hardware performance requirements and projections for CAMAC I/O and data analysis and display are presented. Described are three applications that have realtime requirements and are located on separate processors, connected to PPPL's VAX Cluster by an Ethernet link. Building upon a previous large software base, general-purpose subroutine libraries and utilities are being emphasized. The most useful of these are described. The use of software packages from DEC, third-party vendors, and the fusion community, is also described. The new approaches to software development that are being incorporated into the DAS efforts are discussed. Specific future challenges are also described.

Davis, W.M.; Roney, P.; Gibney, T.; Funk, P.; Keller, M.; Sauthoff, N.; Davis, S.; Bates, G.; Corneliussen, M.; Fishman, H.

1987-08-01T23:59:59.000Z

467

Electron cyclotron emission radiometer upgrade on the Joint European Torus (JET) tokamak  

SciTech Connect (OSTI)

The capabilities of the Joint European Torus (JET) electron cyclotron emission (ECE) diagnostics have recently been extended with an upgrading of the heterodyne radiometer. The number of channels has been doubled to 96 channels, with a frequency separation corresponding to <1 cm for JET magnetic field gradient, and with a frequency response of 1 MHz. This enhancement has increased the radial coverage of the ECE electron temperature measurements in JET to approximately the full plasma column (limited at R>2.6 m for the X-mode due to harmonic overlap) at almost all magnetic field values used at JET (1.7 Tupgraded radiometer is presented along with some results showing its performance.

Luna, E. de la; Sanchez, J.; Tribaldos, V.; Conway, G.; Suttrop, W.; Fessey, J.; Prentice, R.; Gowers, C.; Chareau, J. M. [Asociacion EURATOM-CIEMAT para Fusion, CIEMAT, Madrid (Spain); IPP-EURATOM Association, Garching (Germany); EURATOM-UKAEA Fusion Associations, Culham Science Centre, Abingdon (United Kingdom); European Commission, Institute for Transuranium Elements, Karlsruhe (Germany)

2004-10-01T23:59:59.000Z

468

Prototype Testing for a Copper Rotatable Collimator for the LHC Collimation Upgrade  

SciTech Connect (OSTI)

The Phase II upgrade to the LHC collimation system calls for complementing the robust Phase I graphite collimators with high Z Phase II collimators. The design for the collimation upgrade has not been finalized. One option is to use metallic rotatable collimators and testing of this design will be discussed here. The Phase II collimators must be robust in various operating conditions and accident scenarios. A prototype collimator jaw referred to as RC0 has been tested for both mechanical and thermal compliance with the design goals. Thermal expansion bench-top tests are compared to ANSYS simulation results. The prototype has also been tested in vacuum bake-out to confirm compliance with the LHC vacuum spec. CMM equipment has been used to verify the flatness of the jaw surface after heat tests and bake-out.

Smith, Jeffrey Claiborne; Anzalone, Gene; Doyle, Eric; Keller, Lewis; Lundgren, Steven; Markiewicz, Thomas Walter; Rogers, Reggie; /SLAC

2009-01-20T23:59:59.000Z

469

Design of a Rotatable Copper Collimator for the LHC Phase II Collimation Upgrade  

SciTech Connect (OSTI)

The Phase II upgrade to the LHC collimation system calls for complementing the robust Phase I graphite collimators with high Z, low impedance Phase II collimators. The design for the collimation upgrade has not been finalized. One option is to use metallic rotatable collimators and this design will be discussed here. The Phase II collimators must be robust in various operating conditions and accident scenarios. Design issues include: (1) Collimator jaw deflection and sagitta due to heating must be small when operated in the steady state condition, (2) Collimator jaws must withstand transitory periods of high beam impaction with no permanent damage, (3) Jaws must recover from accident scenario where up to 8 full intensity beam pulses impact on the jaw surface and (4) The beam impedance contribution due to the collimators must be small to minimize coherent beam instabilities.

Smith, Jeffrey Claiborne; Doyle, Eric; Keller, Lewis; Lundgren, Steven; Markiewicz, Thomas Walter; /SLAC; Lari, Luisella; /LPHE, Lausanne

2010-02-15T23:59:59.000Z

470

Advanced conceptual design report: T Plant secondary containment and leak detection upgrades. Project W-259  

SciTech Connect (OSTI)

The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades.

Hookfin, J.D.

1995-05-12T23:59:59.000Z

471

Mo{sub 5}Si{sub 3} single crystals: Physical properties and mechanical behavior  

SciTech Connect (OSTI)

The materials processing, physical properties and mechanical behavior of an ultra-high temperature structural silicide, Mo{sub 5}Si{sub 3}, have been studied. High purity single crystals of Mo{sub 5}Si{sub 3} have been synthesized by both optical floating zone and Czochralski methods. The thermal and elastic properties of the MO{sub 5}Si{sub 3} single crystals were experimentally measured. Results show that Mo{sub 5}Si{sub 3} has significant thermal expansion anisotropy along the a and c directions with {alpha}{sub c}/{alpha}{sub a} = 2.2. Single crystal elastic moduli of Mo{sub 5}Si{sub 3} indicate that it has less elastic anisotropy and lower shear moduli than transition metal disilicides. Tensile stresses of up to 1.8 GPa can develop at grain boundaries after cooling from the melting point due to the thermal expansion mismatch in Mo{sub 5}Si{sub 3}, causing grain boundary cracking during processing of polycrystals. Room temperature Vickers indentation tests on (100) and (001) planes have been performed with different indenter diagonal orientations. The orientation dependence of hardness and fracture toughness of Mo{sub 5}Si{sub 3} single crystals have been obtained. The corresponding deformation and fracture modes have been revealed by microscopy studies. A comparison of Mo{sub 5}Si{sub 3} with other high temperature structural silicides, e.g., C11{sub b} and C40 transition metal disilicides, is discussed.

Chu, F.; Thoma, D.J.; McClellan, K.J.; Peralta, P.

1998-12-01T23:59:59.000Z

472

Description of coordinatively unsaturated sites regeneration over MoS2-based HDS catalysts using 35  

E-Print Network [OSTI]

envisaged. Moreover, on the sulfur edge the H2S release activation energy is too high (~ 13.5 kcal.mol-1 likely to occur on the MoS2 metallic edge through the departure of an H2S molecule. In the present paper, we aimed at examining the H2S departure from MoS2 catalysts promoted with Co and Ni. The [35 S

Boyer, Edmond

473

Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements  

SciTech Connect (OSTI)

Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

French, Sean B [Los Alamos National Laboratory; Johns - Hughes, Kathryn W [Los Alamos National Laboratory

2011-01-21T23:59:59.000Z

474

Soft zone formation in dissimilar welds between two Cr-Mo steels  

SciTech Connect (OSTI)

Two dissimilar weldments between 9Cr-1Mo and 2.25Cr-1Mo ferritic steels have been characterized for their microstructural stability during various postweld heat treatments (PWHTs). The samples for the investigation were extracted from bead-on-plate weldments made by depositing 2.25Cr-1Mo weld metal on 9Cr-1Mo base plate and vice versa. Subsequent application of PWHT resulted in the formation of a soft zone in the low Cr ferritic steel weld or base plate. A carbide-rich hard zone, adjoining the soft zone, was also detected in the high Cr side of the weldment. Unmixed zones in the weld metal provided additional soft and hard zones in the weld metals. The migration of carbon from low-Cr steel to high-Cr steel, driven by the carbon activity gradient, has been shown to be responsible for the formation of soft and hard zones. A carbon activity diagram for 2.25Cr-1Mo/9Cr-1Mo weldments has been proposed to aid in the selection of welding consumables for reducing or preventing the soft zone formation.

Albert, S.K.; Gill, T.P.S.; Tyagi, A.K.; Mannan, S.L.; Rodriguez, P. [Indira Gandhi Centre for Atomic Research, Kalpakkam (India); Kulkarni, S.D. [Indian Inst. of Tech., Bombay (India)

1997-03-01T23:59:59.000Z

475

Food and Drug Administration process validation activities to support 99Mo production at Sandia National Laboratories  

SciTech Connect (OSTI)

Prior to 1989 {sup 99}Mo was produced in the US by a single supplier, Cintichem Inc., Tuxedo, NY. Because of problems associated with operating its facility, in 1989 Cintichem elected to decommission the facility rather than incur the costs for repair. The demise of the {sup 99}Mo capability at Cintichem left the US totally reliant upon a single foreign source, Nordion International, located in Ottawa Canada. In 1992 the DOE purchased the Cintichem {sup 99}Mo Production Process and Drug Master File (DMF). In 1994 the DOE funded Sandia National Laboratories (SNL) to produce {sup 99}Mo. Although Cintichem produced {sup 99}Mo and {sup 99m}Tc generators for many years, there was no requirement for process validation which is now required by the Food and Drug Administration (FDA). In addition to the validation requirement, the requirements for current Good manufacturing Practices were codified into law. The purpose of this paper is to describe the process validation being conducted at SNL for the qualification of SNL as a supplier of {sup 99}Mo to US pharmaceutical companies.

McDonald, M.J.; Bourcier, S.C.; Talley, D.G.

1997-07-01T23:59:59.000Z

476

MoS{sub 2} nanotube exfoliation as new synthesis pathway to molybdenum blue  

SciTech Connect (OSTI)

Graphical abstract: . Display Omitted Highlights: ? New synthesis approach to obtaining molybdenum blue via exfoliated MoS{sub 2} nanotubes. ? Material is prone to self assembly and is stable in high vacuum. ? Molecules are as small as 2 nm and their clusters are up to tens of nanometers. ? Change in absorption and oxidation states from the precursor MoS{sub 2}. -- Abstract: Molybdenum blue-type materials are usually obtained by partially reducing Mo{sup VI+} in acidic solutions, while in the presented method it is formed in ethanol solution of exfoliated MoS{sub 2} nanotubes, where the MoS{sub 2} flakes are the preferential location for their growth. Material was investigated by means of scanning electron and atomic force microscopy, showing the structure and self assembly, while also confirming that it is stable in high vacuum with molecules as small as 1.6 nm and the agglomerates of few tens of nanometres. The ultravioletvisible and photoelectron spectrometry show the change in absorption properties and oxidation states from MoS{sub 2} structure to molybdenum blue, while the presence of sulphur suggests that this is a new type of molybdenum blue material.

Visic, B., E-mail: bojana.visic@ijs.si [Jozef Stefan Institute, Jamova cesta 39, SI-1000 Ljubljana (Slovenia); Gunde, M. Klanjsek [National Institute of Chemistry, Hajdrihova 19, SI-1000 Ljubljana (Slovenia)] [National Institute of Chemistry, Hajdrihova 19, SI-1000 Ljubljana (Slovenia); Kovac, J.; Iskra, I. [Jozef Stefan Institute, Jamova cesta 39, SI-1000 Ljubljana (Slovenia)] [Jozef Stefan Institute, Jamova cesta 39, SI-1000 Ljubljana (Slovenia); Jelenc, J.; Remskar, M. [Jozef Stefan Institute, Jamova cesta 39, SI-1000 Ljubljana (Slovenia) [Jozef Stefan Institute, Jamova cesta 39, SI-1000 Ljubljana (Slovenia); Centre of Excellence Namaste, Jamova cesta 39, SI-1000 Ljubljana (Slovenia)

2013-02-15T23:59:59.000Z

477

Environmental assessment for the domestic water supply upgrades and consolidation on the Savannah River Site  

SciTech Connect (OSTI)

The domestic water systems on the Savannah River Site (SRS) are currently in need of upgrading to ensure compliance with the Safe Drinking Water Act and South Carolina Department of Health and Environmental Control (SCDHEC) Drinking Water Regulations. The SRS has 28 separate goundwater-based drinking water systems in use across the site. These aging systems were designed and constructed in the 1950s and are now facing increasing difficulties in meeting cur-rent regulations. Audits of the systems conducted by SCDHEC in 1986, 1988, 1991, and 1993 identified shortfalls in meeting the requirements for secondary maximum containment levels (MCLS) and SCDHEC design standards. Secondary MCLs are those items, such as odor or appearance, that do not pose a direct health impact. SRS has committed to SCDHEC to correct the drinking water discrepancies and construct two new consolidated inter-area drinking water systems. Upgrading the SRS drinking water systems would be necessary to support site activities regardless of the makeup or the mission at SRS. As such, the proposed upgrade and consolidation of SRS domestic water systems is treated as part of the ``No Action`` alternative for the Programmatic Environmental Impact Statement for Reconfiguration of the Nuclear Weapons Complex .

Not Available

1994-06-01T23:59:59.000Z

478

Risk management considerations for seismic upgrading of an older facility for short-term residue stabilization  

SciTech Connect (OSTI)

Building 707 and its addition, Building 707A, were selected, after the production mission of Rocky Flats was terminated a few years ago, to stabilize many of the plutonium residues remaining at the site by 2002. The facility had undergone substantial safety improvements to its safety systems and conduct of operations for resumption of plutonium operations in the early 1990s and appeared ideally suited for this new mission to support accelerated Site closure. During development of a new authorization basis, a seismic evaluation was performed. This evaluation addressed an unanalyzed expansion joint and suspect connection details for the precast concrete tilt-up construction and concluded that the seismic capacity of the facility is less than half of that determined by previous analysis. Further, potential seismic interaction was identified between a collapsing Building 707 and the seismically upgraded Building 707A, possibly causing the partial collapse of the latter. Both the operating contractor and the Department of Energy sought a sound technical basis for deciding how to proceed. This paper addresses the risks of the as-is facility and possible benefits of upgrades to support a decision on whether to upgrade the seismic capacity of Building 707, accept the risk of the as-is facility for its short remaining mission, or relocate critical stabilization missions. The paper also addresses the Department of Energy`s policy on natural phenomena.

Additon, S.L.; Peregoy, W.L. [TENERA Rocky Flats, LLC, Golden, CO (United States); Foppe, T.L. [Foppe and Associates, Inc., Golden, CO (United States)

1999-06-01T23:59:59.000Z

479

FLOATING PRESSURE CONVERSION AND EQUIPMENT UPGRADES OF TWO 3.5KW, 20K, HELIUM REFRIGERATORS  

SciTech Connect (OSTI)

Two helium refrigerators, each rated for 3.5 KW at 20 K, are used at NASA's Johnson Space Center (JSC) in Building No. 32 to provide cryogenic-pumping within two large thermal-vacuum chambers. These refrigerators were originally commissioned in 1996. New changes to the controls of these refrigerators were recently completed. This paper describes some of the control issues that necessitated the controls change-over. It will describe the modifications and the new process control which allows the refrigerators to take advantage of the Ganni Cycle floating pressure control technology. The controls philosophy change-over to the floating pressure control technology was the first application on a helium gas refrigeration system. Previous implementations of the floating pressure technology have been on 4 K liquefaction and refrigeration systems, which have stored liquid helium volumes that have level indications used for varying the pressure levels (charge) in the system for capacity modulation. The upgrades have greatly improved the performance, stability, and efficiency of these two refrigerators. The upgrades have also given the operators more information and details about the operational status of the main components (compressors, expanders etc.) of the refrigerators at all operating conditions (i.e. at various loads in the vacuum chambers). The performance data of the two systems, pre and post upgrading are presented.

J. Homan, V. Ganni, A. Sidi-Yekhlef, J. Creel, R. Norton, R. Linza, G. Vargas, J. Lauterbach, J. Urbin, D. Howe

2010-04-01T23:59:59.000Z

480

Use of 2.5-D and 3-D technology to evaluate control room upgrades  

SciTech Connect (OSTI)

This paper describes an Electric Power Research Inst. (EPRI) study in which 2.5-D and 3-D visualization technology was applied to evaluate the design of a nuclear power plant control room upgrade. The study involved converting 3-D CAD flies of a planned upgrade into a photo-realistic appearing virtual model, and evaluating the value and usefulness of the model. Nuclear utility and EPRI evaluators viewed and interacted with the control room virtual model with both 2.5-D and 3-D representations. They identified how control room and similar virtual models may be used by utilities for design and evaluation purposes; assessed potential economic and other benefits; and identified limitations, potential problems, and other issues regarding use of visualization technology for this and similar applications. In addition, the Halden CREATE (Control Room Engineering Advanced Tool-kit Environment) Verification Tool was applied to evaluate features of the virtual model against US NRC NUREG 0700 Revision 2 human factors engineering guidelines (NUREG 0700) [1]. The study results are very favorable for applying 2.5-D visualization technology to support upgrading nuclear power plant control rooms and other plant facilities. Results, however, show that today's 3-D immersive viewing systems are difficult to justify based on cost, availability and value of information provided for this application. (authors)

Hanes, L. F.; Naser, J. [2023 Wickford Road, Columbus, OH 43221 Electric Power Research Inst., 3420 Hillview Ave., Palo Alto, CA 94303 (United States)

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "mo nelson upgraded" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY  

SciTech Connect (OSTI)

The Continuous Electron Beam Accelerator Facility (CEBAF) accelerator at Jefferson Lab will be upgraded from 6 GeV to 12 GeV in the next few years. To meet the requirement of the new machine and to take the opportunity to improve the beam quality, the CEBAF injector will be upgraded with a higher voltage gun, a new booster, and a new accelerating RF module. The CEBAF injector creates and accelerates three beams at different currents simultaneously. The beams are interleaved, each at one third of the RF frequency, traveling through the same beam line. The higher voltage gun will lower the space charge effects. The new booster with optimized beam dynamics will complete the bunching process and provide initial acceleration matched to the new gun voltage. Using our latest SRF design, the new booster has significantly lower x/y coupling effects that should improve our beam setup and operation for the highly sensitive parity experiments scheduled for the CEBAF's future. Finally, the new accelerating RF module will roughly double the injector final energy to match the rest of the 12 GeV accelerator. In this paper we will provide more detail about this upgrade.

Reza Kazimi, Arne Freyberger, Alicia Hofler, Andrew Hutton, Fay Hannon

2012-07-01T23:59:59.000Z

482

(HC){sub 3} process - An economical technology for upgrading bitumen and heavy oil  

SciTech Connect (OSTI)

This paper discusses the development of the (HC){sub 3} Process. (HC){sub 3} is a high conversion hydro-cracking process with integrated hydro-treating that has been developed by Alberta Department of Energy, Oil Sands and Research Division. The (HC){sub 3} Process has been developed and demonstrated to achieve conversion in excess of 95% at moderate pressures and relatively high temperature in a very cost effective manner. This has been achieved with the aid of a colloidal catalyst that selectively converts the asphaltenes, and a proprietary recycle methodology that significantly reduces the catalyst consumption. Cost and economic studies indicate that capital and operating costs of the (HC){sub 3} upgrading scheme are lower than those of other high conversion schemes and are comparable to those of low and moderate conversion upgrading schemes. This cost advantage combined with the high yield gives the (HC){sub 3} a significant economic advantage over other upgrading schemes. The (HC){sub 3} process shows great promise at achieving high conversion efficiently and economically. The process is ready for commercial testing. Discussions are underway with regards to testing the process in a commercial facility designed to process nominally 5000 barrels per day (BPD).

Padamsey, R.; Bailey, R.T.; Cyr, T.J. [Alberta Dept. of Energy, Calgary (Canada)] [and others

1995-12-31T23:59:59.000Z

483

Reactor Accident Analysis Methodology for the Advanced Test Reactor Critical Facility Documented Safety Analysis Upgrade  

SciTech Connect (OSTI)

The regulatory requirement to develop an upgraded safety basis for a DOE nuclear facility was realized in January 2001 by issuance of a revision to Title 10 of the Code of Federal Regulations Section 830 (10 CFR 830).1 Subpart B of 10 CFR 830, Safety Basis Requirements, requires a contractor responsible for a DOE Hazard Category 1, 2, or 3 nuclear facility to either submit by April 9, 2001 the existing safety basis which already meets the requirements of Subpart B, or to submit by April 10, 2003 an upgraded facility safety basis that meets the revised requirements.1 10 CFR 830 identifies Nuclear Regulatory Commission (NRC) Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants2 as a safe harbor methodology for preparation of a DOE reactor documented safety analysis (DSA). The regulation also allows for use of a graded approach. This report presents the methodology that was developed for preparing the reactor accident analysis portion of the Advanced Test Reactor Critical Facility (ATRC) upgraded DSA. The methodology was approved by DOE for developing the ATRC safety basis as an appropriate application of a graded approach to the requirements of 10 CFR 830.

Gregg L. Sharp; R. T. McCracken

2003-06-01T23:59:59.000Z

484

Reactor Accident Analysis Methodology for the Advanced Test Reactor Critical Facility Documented Safety Analysis Upgrade  

SciTech Connect (OSTI)

The regulatory requirement to develop an upgraded safety basis for a DOE Nuclear Facility was realized in January 2001 by issuance of a revision to Title 10 of the Code of Federal Regulations Section 830 (10 CFR 830). Subpart B of 10 CFR 830, ''Safety Basis Requirements,'' requires a contractor responsible for a DOE Hazard Category 1, 2, or 3 nuclear facility to either submit by April 9, 2001 the existing safety basis which already meets the requirements of Subpart B, or to submit by April 10, 2003 an upgraded facility safety basis that meets the revised requirements. 10 CFR 830 identifies Nuclear Regulatory Commission (NRC) Regulatory Guide 1.70, ''Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants'' as a safe harbor methodology for preparation of a DOE reactor documented safety analysis (DSA). The regulation also allows for use of a graded approach. This report presents the methodology that was developed for preparing the reactor accident analysis portion of the Advanced Test Reactor Critical Facility (ATRC) upgraded DSA. The methodology was approved by DOE for developing the ATRC safety basis as an appropriate application of a graded approach to the requirements of 10 CFR 830.

Sharp, G.L.; McCracken, R.T.

2003-05-13T23:59:59.000Z

485

Current Lead Design for the Accelerator Project for Upgrade of LHC  

SciTech Connect (OSTI)

The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. In collaboration with Brookhaven National Laboratory, Fermilab is developing sub-systems for an upgrade of the LHC final focus magnet systems. A concept of main and auxiliary helium flow was developed that allows the superconductor to remain cold while the lead body warms up to prevent upper section frosting. The auxiliary flow will subsequently cool the thermal shields of the feed box and the transmission line cryostats. A thermal analysis of the current lead central heat exchange section was performed using analytic and FEA techniques. A method of remote soldering was developed that allows the current leads to be field replaceable. The remote solder joint was designed to be made without flux or additional solder, and able to be remade up to ten full cycles. A method of upper section attachment was developed that allows high pressure sealing of the helium volume. Test fixtures for both remote soldering and upper section attachment for the 13 kA lead were produced. The cooling concept, thermal analyses, and test results from both remote soldering and upper section attachment fixtures are presented.

Brandt, Jeffrey S.; Cheban, Sergey; Feher, Sandor; Kaducak, Marc; Nobrega, Fred; Peterson, Tom

2010-01-01T23:59:59.000Z

486

Floodplain Assessment for the Proposed Outdoor Fire Range Upgrades at TA-72 in Lower Sandia Canyon, Los Alamos National Laboratory  

SciTech Connect (OSTI)

Los Alamos National Laboratory (LANL) is preparing to implement actions in Sandia Canyon at Technical Area (TA) 72. Los Alamos National Security (LANS) biologists conducted a floodplain determination and this project is partially located within a 100-year floodplain. The proposed project is to upgrade the existing outdoor shooting range facilities at TA-72. These upgrades will result in increased safety and efficiencies in the training for Protective Force personnel. In order to remain current on training requirements, the firing ranges at TA-72 will be upgraded which will result in increased safety and efficiencies in the training for Protective Force personnel (Figure 1). These upgrades will allow for an increase in class size and more people to be qualified at the ranges. Some of these upgrades will be built within the 100-year floodplain. The upgrades include: concrete pads for turning target systems and shooting positions, new lighting to illuminate the firing range for night fire, a new speaker system for range operations, canopies at two locations, an impact berm at the far end of the 300-yard mark, and a block wall for road protection.

Hathcock, Charles D. [Los Alamos National Laboratory

2012-08-27T23:59:59.000Z

487

Enriched Zn$^{100}$MoO$_4$ scintillating bolometers to search for $0 ? 2?$ decay of $^{100}$Mo with the LUMINEU experiment  

E-Print Network [OSTI]

The LUMINEU project aims at performing a demonstrator underground experiment searching for the neutrinoless double beta decay of the isotope $^{100}$Mo embedded in zinc molybdate (ZnMoO$_4$) scintillating bolometers. In this context, a zinc molybdate crystal boule enriched in $^{100}$Mo to 99.5\\% with a mass of 171 g was grown for the first time by the low-thermal-gradient Czochralski technique. The production cycle provided a high yield (the crystal boule mass was 84\\% of initial charge) and an acceptable level -- around 4\\% -- of irrecoverable losses of the costy enriched material. Two crystals of 59 g and 63 g, obtained from the enriched boule, were tested aboveground at milli-Kelvin temperature as scintillating bolometers. They showed a high detection performance, equivalent to that of previously developed natural ZnMoO$_4$ detectors. These results pave the way to future sensitive searches based on the LUMINEU technology, capable to approach and explore the inverted hierarchy region of the neutrino mass pattern.

A. S. Barabash; D. M. Chernyak; F. A. Danevich; A. Giuliani; I. M. Ivanov; E. P. Makarov; M. Mancuso; S. Marnieros; S. G. Nasonov; C. Nones; E. Olivieri; G. Pessina; D. V. Poda; V. N. Shlegel; M. Tenconi; V. I. Tretyak; Ya. V. Vasiliev; M. Velazquez; V. N. Zhdankov

2014-07-05T23:59:59.000Z

488

Control of absorption of monolayer MoS$_{2}$ thin-film transistor in one-dimensional defective photonic crystal  

E-Print Network [OSTI]

The light absorption and transmission of monolayer MoS$_{2}$ in a one-dimensional defective photonic crystal (d-1DPC) is theoretically investigated. The study shows that the strong interference effect decreases photon density in particular areas of the microcavity. The d-1DPC can reduce light absorption of monolayer MoS$_{2}$ and enhance light transmission. The impact of monolayer MoS$_{2}$ light absorption on the localization effect of photon is investigated when monolayer MoS$_{2}$ and the organic light-emitting diode are located in the same microcavity. However, monolayer MoS$_{2}$ does not reduce the localization effect of light by regulating the position of monolayer MoS$_{2}$ in the microcavity.

Yang, Fang-Fang; Xiao, Wen-bo; Liu, Jiang-Tao; Liu, Nian-Hua

2014-01-01T23:59:59.000Z

489

Upgrading of middle distillate fractions of syncrudes from athabasca oil sands  

SciTech Connect (OSTI)

Middle distillate fractions of syncrudes from Athabasca Oil Sands were evaluated for suitability as feedstocks in the catalytic conversion to diesel fuel meeting cetane number specifications. Hydrogenation of aromatic components to napthenes under severe conditions (380 to 400/sup 0/C, 2500 psig) using sulfided CoO/MoO/sub 3/ and NiO/WO/sub 3/ over ..cap alpha.. . Al/sub 2/O/sub 3/ in a previously described catalyst testing system. Reaction products were analyzed for aromatic carbon content using C/sup 13/ NMR spectroscopy and pseudo first order rate constants and activation energies (15.0 and 14.2 kcal 1 g-mole, respectively) were determined by regression analysis. At optimum conditions 97% aromatic conversion was obtained with the Ni-W catalyst. Product diesel fuel cetane number (42) was within specifications. Co-Mo catalyst was significantly less active.

Wilson, M.F.; Kriz, J.F.

1983-03-01T23:59:59.000Z

490

Average and recommended half-life values for two neutrino double beta decay: Upgrade-2013  

SciTech Connect (OSTI)

All existing positive results on two neutrino double beta decay in different nuclei were analyzed. Using the procedure recommended by the Particle Data Group, weighted average values for half-lives of {sup 48}Ca, {sup 76}Ge, {sup 82}Se, {sup 96}Zr, {sup 100}Mo, {sup 100}Mo?{sup 100}Ru (0{sub 1}{sup +}), {sup 116}Cd, {sup 130}Te, {sup 136}Xe, {sup 150}Nd, {sup 150}Nd?{sup 150}Sm (0{sub 1}{sup +}) and {sup 238}U were obtained. Existing geochemical data were analyzed and recommended values for half-lives of {sup 128}Te and {sup 130}Ba are proposed. I recommend the use of these results as the most currently reliable values for half-lives.

Barabash, A. S. [Institute of Theoretical and Experimental Physics, B. Cheremushkinskaya 25, 117218 Moscow (Russian Federation)

2013-12-30T23:59:59.000Z

491

Beta. -MoO sub 3 produced from a novel freeze drying route  

SciTech Connect (OSTI)

Powdered samples of {beta}-MoO{sub 3} have been produced by the gentle heat treatment of freeze-dried molybdic acid at 350{degree}C for 1 hr. The samples, yellow-green in appearance, contained varying amounts of the thermodynamically stable {alpha}-MoO{sub 3}, depending upon the time and temperature of heat treatment. Neutron diffraction data were collected at 300 K. all peaks, not attributable to {alpha}-MoO{sub 3}, were indexed on the basis of a monoclinic cell, P2{sub 1}/c, {alpha} = 7.1228(7), b = 5.3660(6), c = 5.5665(6), {beta} = 92.01(1){degree}, V = 212.62(6){angstrom}{sup 3}. The structure, which is related to ReO{sub 3}, contains two crystallographically independent octahedra. Both show evidence of disorder at the Mo and O sites. Two distinct orientations of a short mo-O distance, suggestive of the type of molybdenyl bond observed in both the {alpha} and {beta}{prime}-forms, are primarily responsible for the observed disordering.

Parise, J.B. (State Univ. of New York, Stony Brook (United States)); McCarron, E.M. III (E.I. Dupont de Nemours and Co., Inc., Wilmington, DE (United States)); Von Dreele, R.; Goldstone, J.A. (Los Alamos National Lab., NM (United States))

1991-07-01T23:59:59.000Z

492

Oxidation and creep behavior of Mo*5*Si*3* based materials  

SciTech Connect (OSTI)

Mo{sub 5}Si{sub 3} shows promise as a high temperature creep resistant material. The high temperature oxidation resistance of Mo{sub 5}Si{sub 3} has been found to be poor, however, limiting its use in oxidizing atmospheres. Undoped Mo{sub 5}Si{sub 3} exhibits mass loss in the temperature range 800{degrees}-1200{degrees}C due to volatilization of molybdenum oxide, indicating that the silica scale does not provide a passivating layer. The addition of boron results in protective scale formation and parabolic oxidation kinetics in the temperature range of 1050{degrees}-1300{degrees}C. The oxidation rate of Mo{sub 5}Si{sub 3} was decreased by 5 orders of magnitude at 1200{degrees}C by doping with less than two weight percent boron. Boron doping eliminates catastrophic {open_quote}pest{close_quote} oxidation at 800{degrees}C. The mechanism for improved oxidation resistance of boron doped Mo{sub 5}Si{sub 3} is due to scale modification by boron.

Meyer, M.

1995-06-19T23:59:59.000Z

493

TEM Characterization of High Burn-up Microstructure of U-7Mo Alloy  

SciTech Connect (OSTI)

As an essential part of global nuclear non-proliferation effort, the RERTR program is developing low enriched U-Mo fuels (< 20% U-235) for use in research and test reactors that currently employ highly enriched uranium fuels. One type of fuel being developed is a dispersion fuel plate comprised of U-7Mo particles dispersed in Al alloy matrix. Recent TEM characterizations of the ATR irradiated U-7Mo dispersion fuel plates include the samples with a local fission densities of 4.5, 5.2, 5.6 and 6.3 E+21 fissions/cm3 and irradiation temperatures of 101-136?C. The development of the irradiated microstructure of the U-7Mo fuel particles consists of fission gas bubble superlattice, large gas bubbles, solid fission product precipitates and their association to the large gas bubbles, grain subdivision to tens or hundreds of nanometer size, collapse of bubble superlattice, and amorphisation. This presentation will describe the observed microstructures specifically focusing on the U-7Mo fuel particles. The impact of the observed microstructure on the fuel performance and the comparison of the relevant features with that of the high burn-up UO2 fuels will be discussed.

Jian Gan; Brandon Miller; Dennis Keiser; Adam Robinson; James Madden; Pavel Medvedev; Daniel Wachs

2014-04-01T23:59:59.000Z

494

Elementary Steps of Syngas Reactions on Mo2C(001): Adsorption Thermochemistry and Bond Dissociation  

SciTech Connect (OSTI)

Density functional theory (DFT) and ab initio thermodynamics are applied in order to investigate the most stable surface and subsurface terminations of Mo{sub 2}C(001) as a function of chemical potential and in the presence of syngas. The Mo-terminated (001) surface is then used as a model surface to evaluate the thermochemistry and energetic barriers for key elementary steps in syngas reactions. Adsorption energy scaling relations and Broensted-Evans-Polanyi relationships are established and used to place Mo{sub 2}C into the context of transition metal surfaces. The results indicate that the surface termination is a complex function of reaction conditions and kinetics. It is predicted that the surface will be covered by either C{sub 2}H{sub 2} or O depending on conditions. Comparisons to transition metals indicate that the Mo-terminated Mo{sub 2}C(001) surface exhibits carbon reactivity similar to transition metals such as Ru and Ir, but is significantly more reactive towards oxygen.

Medford, Andrew

2012-02-16T23:59:59.000Z

495

Method for the production of {sup 99m}Tc compositions from {sup 99}Mo-containing materials  

DOE Patents [OSTI]

An improved method is described for producing {sup 99m}Tc compositions from {sup 99}Mo compounds. {sup 100}Mo metal or {sup 100}MoO{sub 3} is irradiated with photons in a particle (electron) accelerator to ultimately produce {sup 99}MoO{sub 3}. This composition is then heated in a reaction chamber to form a pool of molten {sup 99}MoO{sub 3} with an optimum depth of 0.5--5 mm. A gaseous mixture thereafter evolves from the molten {sup 99}MoO{sub 3} which contains vaporized {sup 99}MoO{sub 3}, vaporized {sup 99m}TcO{sub 3}, and vaporized {sup 99m}TcO{sub 2}. This mixture is then combined with an oxidizing gas (O{sub 2(g)}) to generate a gaseous stream containing vaporized {sup 99m}Tc{sub 2}O{sub 7} and vaporized {sup 99}MoO{sub 3}. Next, the gaseous stream is cooled in a primary condensation stage in the reaction chamber to remove vaporized {sup 99}MoO{sub 3}. Cooling is undertaken at a specially-controlled rate to achieve maximum separation efficiency. The gaseous stream is then cooled in a sequential secondary condensation stage to convert vaporized {sup 99m}Tc{sub 2}O{sub 7} into a condensed {sup 99m}Tc-containing reaction product which is collected. 1 fig.

Bennett, R.G.; Christian, J.D.; Grover, S.B.; Petti, D.A.; Terry, W.K.; Yoon, W.Y.

1998-09-01T23:59:59.000Z

496

Method for the production of .sup.99m Tc compositions from .sup.99 Mo-containing materials  

DOE Patents [OSTI]

An improved method for producing .sup.99m Tc compositions from .sup.99 Mo compounds. .sup.100 Mo metal or .sup.100 MoO.sub.3 is irradiated with photons in a particle (electron) accelerator to ultimately produce .sup.99 MoO.sub.3. This composition is then heated in a reaction chamber to form a pool of molten .sup.99 MoO.sub.3 with an optimum depth of 0.5-5 mm. A gaseous mixture thereafter evolves from the molten .sup.99 MoO.sub.3 which contains vaporized .sup.99 MoO.sub.3, vaporized .sup.99m TcO.sub.3, and vaporized .sup.99m TcO.sub.2. This mixture is then combined with an oxidizing gas (O.sub.2(g)) to generate a gaseous stream containing vaporized .sup.99m Tc.sub.2 O.sub.7 and vaporized .sup.99 MoO.sub.3. Next, the gaseous stream is cooled in a primary condensation stage in the reaction chamber to remove vaporized .sup.99 MoO.sub.3. Cooling is undertaken at a specially-controlled rate to achieve maximum separation efficiency. The gaseous stream is then cooled in a sequential secondary condensation stage to convert vaporized .sup.99m Tc.sub.2 O.sub.7 into a condensed .sup.99m Tc-containing reaction product which is collected.

Bennett, Ralph G. (Idaho Falls, ID); Christian, Jerry D. (Idaho Falls, ID); Grover, S. Blaine (Idaho Falls, ID); Petti, David A. (Idaho Falls, ID); Terry, William K. (Idaho Falls, ID); Yoon, Woo Y. (Idaho Falls, ID)

1998-01-01T23:59:59.000Z

497

Tungsten Divertor Erosion in all Metal Devices: Lessons from the ITER-Like Wall of JET and the All Tungsten ASDEX Upgrade  

E-Print Network [OSTI]

Tungsten Divertor Erosion in all Metal Devices: Lessons from the ITER-Like Wall of JET and the All Tungsten ASDEX Upgrade

498

Position Resolution and Upgrade of the CMS Pixel Detector and Search for the Higgs Boson in the tau+tau- Final State.  

E-Print Network [OSTI]

??The thesis presents a measurement of the resolution of the CMS pixel detector, and shows that with the Phase-I Upgrade an improvement of 25% can (more)

Burgmeier, Armin

2014-01-01T23:59:59.000Z

499

Proposal for the award of a contract for the supply of 5 mm depleted-uranium plates for the UA1 calorimeter upgrading  

E-Print Network [OSTI]

Proposal for the award of a contract for the supply of 5 mm depleted-uranium plates for the UA1 calorimeter upgrading

1986-01-01T23:59:59.000Z

500

Upgraded photon calorimeter with integrating readout for Hall A Compton Polarimeter at Jefferson Lab  

DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

The photon arm of the Compton polarimeter in Hall A of Jefferson Lab has been upgraded to allow for electron beam polarization measurements with better than 1% accuracy. The data acquisition system (DAQ) now includes an integrating mode, which eliminates several systematic uncertainties inherent in the original counting-DAQ setup. The photon calorimeter has been replaced with a Ce-doped Gd2SiO5 crystal, which has a bright output and fast response, and works well for measurements using the new integrating method at electron beam energies from 1 to 6 GeV.

Friend, M; Benmokhtar, F; Camsonne, A; Dalton, M; Franklin, G B; Mamyan, V; Michaels, R; Nanda, S; Nelyubin, V; Paschke, K; Quinn, B; Rakhman, A; Souder, P

2012-06-01T23:59:59.000Z