Coordination of Retail Demand Response with Midwest ISO Markets  

E-Print Network (OSTI)

MISO MP MRO MWDRI M&V NYISO PJM PUC RAP RFC RTO RTP SERC AirRTOs such as New England or PJM. In 2005 MISO became theEdison is a member of PJM). Interruptible (Total = 3398, N =

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

2

SERC | OpenEI  

Open Energy Info (EERE)

SERC SERC Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

3

PJM Staff Present:  

E-Print Network (OSTI)

Participation. Mr Callis then asked Mr. Herman to call roll. B. Mr. Herman reviewed the minutes from the July 31th 2012 Meeting seeking comments. Hearing no comments, the minutes will be finalized and posted to PJM.com. 2. MODEL ON-DEMAND IMPLEMENATION INTIATIVE A. Mr. Thompson led a discussion of Siemens File Builder including the purpose of the tool, where MOD Page 1 of 2users will get the file builder tool from, and how PSSE and PSLF users can both use File Builder. PJM will take the action item to work with Siemens and begin supplying File Builder to non PSSE users B. Mr. Thompson led a discussion on the schedule for building cases in MOD, indicating that PJM will start with a 2013 Series 2014 Summer Peak case. This led to a healthy discussion of how frequently PJM will allow users to update cases, and furthermore what qualifies as a major change vs. a minor change. PJM will begin to categorize and define major modeling updates vs minor modeling updates and when they are allowed in the process. C. Mr. Thompson led a discussion on file formats, and wholesale updates. This topic also led to a discussion on what is a wholesale updates (entire case dumped out in RAW format) vs. an incremental update (entire 34.5 kV system). Members also discussed allocation of new bus numbers for generation

Meredith Gafford; Brian Hallett; Hugh Scott; Phillip Briggs; Jason Harchick; Paul Gerber; Elizabeth Pease; Mike Donnelly; Alexandra Ryder; Rollie Mongonon; Gerry Binder; Joe Callis Facilitator; Tracy Miehlke Facilitator; Bk Choi; Yiming Mao; Ian Mundell; Mark Sims; Jonathan Thompson; Michael Herman Secretary

2013-01-01T23:59:59.000Z

4

PJM©2011 Summary  

E-Print Network (OSTI)

The current PJM tariff limits: – The amount of DR to 25 % of the total amount of each Ancillary Service (day ahead scheduling reserves, synchronized reserves, regulation) requirement. – The amount of batch load DR resources to 20 % of the Synchronized Reserve Requirement – Currently only the SR market is seeing participation near the 25 % cap

unknown authors

2012-01-01T23:59:59.000Z

5

MISO_Renewable_template  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8,2011 8,2011 MISO Comments for the DOE Congestion Workshop 2 MISO Guiding Principles from BOD Conditions Precedent to Build Transmission Transmission Corridor Identification Process Using the Congestion Study Information * Set of planning principles - EISPC-State regulatory, Governor's offices inputs - National policy ? * Studies provide information to make decisions for the above processes - 2012 Congestion Study- actual and regional study results to show where the congestion is and the cost of congestion - EIPC-future congestion evaluations * Conditions precedent for transmission construction- Regions - The regions will study inter-regional transmission as a part of FERC Order 1000 - Regional tariffs, state regulation involved in process, FERC 3 4 Based on current conditions, analyses and recent developments in your region,

6

PJM Interconnection, LLC | Open Energy Information  

Open Energy Info (EERE)

PJM Interconnection, LLC Jump to: navigation, search Name PJM Interconnection, LLC Place Norristown, PA References SGIC1 No information has been entered for this organization....

7

PJM Interconnection (Multiple States) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) < Back Eligibility Developer Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Delaware Program Type Interconnection PJM (originally Pennsylvania, Jersey, Maryland) Interconnection is a Regional Transmission Organization (RTO) that coordinates the movement of wholesale electricity in all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia. The PJM region has an area of 214,000 square miles, a population of about 60 million and a peak demand of 163,848 megawatts

8

SERC Reliability Corporation | OpenEI  

Open Energy Info (EERE)

SERC Reliability Corporation SERC Reliability Corporation Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 113, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO Carolina EIA Renewable Energy Generation SERC Reliability Corporation Virginia Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation / Virginia-Carolina- Reference Case (xls, 118.9 KiB) Quality Metrics

9

PJM Controller Testing with Prototypic PJM Nozzle Configuration  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment Plant (WTP) is being designed and built to pre-treat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks. The WTP consists of three primary facilities—pretreatment, low-activity waste (LAW) vitrification, and high-level waste (HLW) vitrification. The pretreatment facility will receive waste piped from the Hanford tank farms and separate it into a high-volume, low-activity liquid stream stripped of most solids and radionuclides and a much smaller volume of HLW slurry containing most of the solids and most of the radioactivity. Many of the vessels in the pretreatment facility will contain pulse jet mixers (PJM) that will provide some or all of the mixing in the vessels. Pulse jet mixer technology was selected for use in black cell regions of the WTP, where maintenance cannot be performed once hot testing and operations commence. The PJMs have no moving mechanical parts that require maintenance. The vessels with the most concentrated slurries will also be mixed with air spargers and/or steady jets in addition to the mixing provided by the PJMs. Pulse jet mixers are susceptible to overblows that can generate large hydrodynamic forces, forces that can damage mixing vessels or their internal parts. The probability of an overblow increases if a PJM does not fill completely. The purpose of the testing performed for this report was to determine how reliable and repeatable the primary and safety (or backup) PJM control systems are at detecting drive overblows (DOB) and charge vessel full (CVF) conditions. Testing was performed on the ABB 800xA and Triconex control systems. The controllers operated an array of four PJMs installed in an approximately 13 ft diameter × 15 ft tall tank located in the high bay of the Pacific Northwest National Laboratory (PNNL) 336 Building test facility. The PJMs were fitted with 4 inch diameter discharge nozzles representative of the nozzles to be used in the WTP. This work supplemented earlier controller tests done on PJMs with 2 inch nozzles (Bontha et al. 2007). Those earlier tests enabled the selection of appropriate pressure transmitters with associated piping and resulted in an alternate overblow detection algorithm that uses data from pressure transmitters mounted in a water flush line on the PJM airlines. Much of that earlier work was only qualitative, however, due to a data logger equipment failure that occurred during the 2007 testing. The objectives of the current work focused on providing quantitative determinations of the ability of the BNI controllers to detect DOB and CVF conditions. On both control systems, a DOB or CVF is indicated when the values of particular internal functions, called confidence values, cross predetermined thresholds. There are two types of confidence values; one based on a transformation of jet pump pair (JPP) drive and suction pressures, the other based on the pressure in the flush line. In the present testing, we collected confidence levels output from the ABB and Triconex controllers. These data were analyzed in terms of the true and noise confidence peaks generated during multiple cycles of DOB and CVF events. The distributions of peak and noise amplitudes were compared to see if thresholds could be set that would enable the detection of DOB and CVF events at high probabilities, while keeping false detections to low probabilities. Supporting data were also collected on PJM operation, including data on PJM pressures and levels, to provide direct experimental evidence of when PJMs were filling, full, driving, or overblowing.

Bontha, Jagannadha R.; Nigl, Franz; Weier, Dennis R.; Leigh, Richard J.; Johnson, Eric D.; Wilcox, Wayne A.; Pfund, David M.; Baumann, Aaron W.; Wang, Yeefoo

2009-08-21T23:59:59.000Z

10

Demand response participation in PJM wholesale markets  

Science Conference Proceedings (OSTI)

This paper provides an overview of demand response resource participation in PJM wholesale ancillary service markets which include: Day Ahead Scheduling Reserves, Synchronized Reserves and Regulation.

Peter L. Langbein

2012-01-01T23:59:59.000Z

11

Pepco and PJM Interconnection Comments on District of Columbia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM...

12

Response from PJM Interconnection LLC and Pepco to Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM...

13

PJM Interconnection Interview on Wind  

Wind Powering America (EERE)

Vol. 9, No. 5 - December 5, 2007 Vol. 9, No. 5 - December 5, 2007 PJM on wind Wind power is growing rapidly in the United States and in Pennsylvania where 8 wind farms that total 259 megawatts now operate. Those wind farms already generate enough power for about 80,000 homes. Another 4,714 megawatts are in various stages of development within Pennsylvania, which would create enough power for an additional 1.4 mil- lion homes. Just in the Keystone state, wind power is creating thousands of jobs. Across the nation, wind power provides hundreds of millions of dollars of tax payments and rental fees to land- owners, and displaces more and more electricity that would otherwise be made by burning coal, oil, or natural gas. Wind farms create zero air pollution; require no destructive

14

Agreement (“NITSA”) between PJM and Old Dominion Electric Cooperative. The  

E-Print Network (OSTI)

PJM Service Agreement No. 3346. 1 This filing is made jointly by PJM and ODEC in order to provide transmission credits for customer-owned facilities located in the Dominion Zone of the PJM-operated transmission system, as provided for in Section 30.9 of PJM’s Open Access Transmission Tariff (“Tariff”). Pursuant to Section 29.5 of PJM's Tariff, PJM is submitting the NITSA. 2 The remainder of the filing, detailing the support for ODEC's request for transmission credits, has been prepared by ODEC. Specifically, ODEC seeks transmission credits for the following facilities which are owned by its member distribution cooperative, Southside Electric Cooperative: (1)

unknown authors

2013-01-01T23:59:59.000Z

15

Midwest Independent Transmission System Operator (MISO) Energy Storage Study  

Science Conference Proceedings (OSTI)

Midwest Independent Transmission System Operator (MISO) is a nonprofit member-based organization regulated by the Federal Energy Regulatory Commission (FERC). As a Regional Transmission Organization (RTO), MISO provides electricity consumers in 13 states with regional grid management and open access to transmission facilities at a tariff closely regulated by FERC. MISO follows a cycle known as the MISO Transmission Expansion Plan (MTEP) that results in annual recommendations to proceed with expansion pro...

2012-02-29T23:59:59.000Z

16

Property:EIA/861/NercSerc | Open Energy Information  

Open Energy Info (EERE)

NercSerc NercSerc Jump to: navigation, search This is a property of type Boolean. Description: Nerc Serc Entity conducts business operations within the SERC region (Y or N) [1] References ↑ EIA Form EIA-861 Final Data File for 2008 - F861 File Layout-2008.doc Pages using the property "EIA/861/NercSerc" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn + true + A Access Energy Coop + true + Adams Electric Coop + true + Aiken Electric Coop Inc + true + Alabama Municipal Elec Authority + true + Alabama Power Co + true + Albany Water Gas & Light Comm + true + Albemarle Electric Member Corp + true + Albertville Municipal Utils Bd + true + Alcorn County Elec Power Assn + true + Altamaha Electric Member Corp + true +

17

PJM Presentation- The Silver Bullet: Storage! (July 12, 2011)  

Energy.gov (U.S. Department of Energy (DOE))

Presentation by Terry Boston, President and CEO pf PJM Interconnection before the Electricity Advisorty Committee, July 12, 2011, on storage for the smart grid.

18

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network (OSTI)

of Estimated Load Reductions for PJM’s Small Customer Loadof Estimated Load Reductions for PJM’s Small Customer LoadResponse Pilot Project Prepared for PJM Interconnection, LLC

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

19

Pepco and PJM Interconnection Comments on District of Columbia Public  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pepco and PJM Interconnection Comments on District of Columbia Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the Department of Energy on February 17, 2006. Potomac Electric Power Company and PJM Interconnection, L.L.C. jointly submit these comments and answer to the requests for rehearing submitted by the City of Alexandria, Virginia and the Director of the Virginia Department of Environmental Quality in the captioned proceeding . Pepco and PJM Interconnection Comments on District of Columbia Public

20

Property:EIA/861/RtoPjm | Open Energy Information  

Open Energy Info (EERE)

RtoPjm RtoPjm Jump to: navigation, search Property Name RTO_PJM Property Type Boolean Description Indicates that the organization conducts operations in the PJM RTO [1] References ↑ "EIA Form EIA-861 Final Data File for 2010 - 861 Webfile Layout for 2010.doc" Pages using the property "EIA/861/RtoPjm" Showing 25 pages using this property. (previous 25) (next 25) A A & N Electric Coop (Virginia) + true + Adams Electric Cooperative Inc + true + Adams Rural Electric Coop, Inc + true + Allegheny Electric Coop Inc + true + Allegheny Energy Supply Co LLC + true + American Mun Power-Ohio, Inc + true + Appalachian Power Co + true + Atlantic City Electric Co + true + B Bedford Rural Elec Coop, Inc + true + Borough of Butler, New Jersey (Utility Company) + true +

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

ASEO2011: Electric Power Projections for EMM Region - SERC Reliability  

Open Energy Info (EERE)

ASEO2011: Electric Power Projections for EMM Region - SERC Reliability ASEO2011: Electric Power Projections for EMM Region - SERC Reliability Corporation / Virginia-Carolina Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 88, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO Carolina EIA Electric power projections Virginia Data application/vnd.ms-excel icon ASEO2011: Electric Power Projections for EMM Region - SERC Reliability Corporation / Virginia-Carolina- Reference Case (xls, 259.3 KiB)

22

Answer of Potomac Electric Power Company and PJM lnterconnection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Answer of Potomac...

23

Planning for environmental constraints on the PJM system  

Science Conference Proceedings (OSTI)

This chapter provides a snapshot of the existing PJM system and identifies the environmental constraints that form the parameters for the regional approaches analyzed in this study. The chapter begins with a description of the PJM system and the costs and emissions levels of the pollutants under study associated with the reference case (the PJM system configured to meet only Clean Air Act Amendment Phase I SO{sub 2} requirements and the March 1994 NO{sub x} requirements affecting Phase I units){sup 3}. Next, the pollution-reduction scenario assumed for the purpose of the study, which covers the period 1995--2010, is described. Finally, the impacts of this pollution reduction scenario -- emissions that would need to be avoided on the reference case PJM system -- are identified. Modeling methods are described alongside the study`s results. Other chapters discuss: environmental constraints, alternate plans to achieve environmental goals, and comparison of alternate plans.

Not Available

1994-07-15T23:59:59.000Z

24

Property:EIA/861/IsoMiso | Open Energy Information  

Open Energy Info (EERE)

IsoMiso IsoMiso Jump to: navigation, search Property Name ISO_MISO Property Type Boolean Description Indicates that the organization conducts operations in the Midwest ISO region [1] References ↑ "EIA Form EIA-861 Final Data File for 2010 - 861 Webfile Layout for 2010.doc" Pages using the property "EIA/861/IsoMiso" Showing 25 pages using this property. (previous 25) (next 25) A Adams Electric Coop + true + Adams-Columbia Electric Coop + true + Alger-Delta Coop Electric Assn + true + Algoma Utility Comm + true + Amana Society Service Co + true + Ameren Illinois Company + true + American Mun Power-Ohio, Inc + true + American Transmission Systems Inc + true + Arrowhead Electric Coop, Inc + true + Atlantic Municipal Utilities + true + B Barron Electric Coop + true +

25

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation  

Open Energy Info (EERE)

Delta Delta Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 109, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO Delta EIA Renewable Energy Generation SERC Reliability Corporation Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation / Delta- Reference Case (xls, 118.9 KiB) Quality Metrics Level of Review Peer Reviewed Comment

26

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation  

Open Energy Info (EERE)

Virginia-Carolina Virginia-Carolina Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 113, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO Carolina EIA Renewable Energy Generation SERC Reliability Corporation Virginia Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation / Virginia-Carolina- Reference Case (xls, 118.9 KiB) Quality Metrics

27

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation  

Open Energy Info (EERE)

Southeastern Southeastern Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 111, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Renewable Energy Generation SERC Reliability Corporation Southeastern Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation / Southeastern- Reference Case (xls, 119 KiB) Quality Metrics Level of Review Peer Reviewed

28

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation  

Open Energy Info (EERE)

Gateway Gateway Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 110, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Gateway Reliability First Corporation SERC Reliability Corporation Data application/vnd.ms-excel icon AEO2011:Renewable Energy Generation by Fuel - SERC Reliability Corporation / Gateway- Reference Case (xls, 118.9 KiB) Quality Metrics Level of Review Peer Reviewed

29

Preliminary Response of PJM Interconnection, L.L.C. to the Operating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant...

30

Response by PJM to letters from the City of Alexandria and the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 Response by PJM to letters from the City of...

31

Sustainable Energy Resources for Consumers (SERC) Vermont Highlight (Fact Sheet)  

DOE Green Energy (OSTI)

Case study on Vermont's innovative strategy for helping low-income families save energy through its Sustainable Energy Resources for Consumers (SERC) program. The DOE Weatherization Assistance Program (WAP) granted Vermont to give its weatherization clients access to solar energy systems and one-on-one assistance from energy efficiency coaches to help clients achieve meaningful and long-lasting reductions in their energy bills. Vermont-SERC is administered by the Vermont Office of Economic Opportunity and is carried out by five local weatherization agencies. The purpose of the program is to identify technologies and new approaches-in this case, solar energy and energy efficiency coaches-that can improve weatherization services to low-income clients. The program selects households that have previously received weatherization services. This has several advantages. First, the clients already understand how weatherization works and are willing to strive for additional energy savings. Second, the weatherization agencies are working with clients who have previously had weatherization and therefore have complete energy usage data from utility bills collected during the first energy upgrade installation. This allows the agencies to select the best potential candidates for solar energy. Agencies have existing knowledge of the homes and can pre-screen them for potential structural problems or lack of south-facing exposure.

Not Available

2012-01-01T23:59:59.000Z

32

Sustainable Energy Resources for Consumers (SERC) Vermont Highlight (Fact Sheet)  

SciTech Connect

Case study on Vermont's innovative strategy for helping low-income families save energy through its Sustainable Energy Resources for Consumers (SERC) program. The DOE Weatherization Assistance Program (WAP) granted Vermont to give its weatherization clients access to solar energy systems and one-on-one assistance from energy efficiency coaches to help clients achieve meaningful and long-lasting reductions in their energy bills. Vermont-SERC is administered by the Vermont Office of Economic Opportunity and is carried out by five local weatherization agencies. The purpose of the program is to identify technologies and new approaches-in this case, solar energy and energy efficiency coaches-that can improve weatherization services to low-income clients. The program selects households that have previously received weatherization services. This has several advantages. First, the clients already understand how weatherization works and are willing to strive for additional energy savings. Second, the weatherization agencies are working with clients who have previously had weatherization and therefore have complete energy usage data from utility bills collected during the first energy upgrade installation. This allows the agencies to select the best potential candidates for solar energy. Agencies have existing knowledge of the homes and can pre-screen them for potential structural problems or lack of south-facing exposure.

2012-01-01T23:59:59.000Z

33

AEO2011: Electric Power Projections for EMM Region - SERC Reliability  

Open Energy Info (EERE)

Southeastern Southeastern Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 86, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Electric Power projections Data application/vnd.ms-excel icon AEO2011: Electric Power Projections for EMM Region - SERC Reliability Corporation / Southeastern- Reference Case (xls, 259.3 KiB)

34

AEO2011: Electric Power Projections for EMM Region - SERC Reliability  

Open Energy Info (EERE)

Central Central Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 87, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO central EIA Electric power projections Data application/vnd.ms-excel icon AEO2011: Electric Power Projections for EMM Region - SERC Reliability Corporation / Central- Reference Case (xls, 259.1 KiB)

35

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation  

Open Energy Info (EERE)

Central Central Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 112, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords undefined Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation / Central- Reference Case (xls, 118.9 KiB) Quality Metrics Level of Review Peer Reviewed Comment Temporal and Spatial Coverage Frequency Annually Time Period 2008-2035

36

AEO2011: Electric Power Projections for EMM Region - SERC Reliability  

Open Energy Info (EERE)

Gateway Gateway Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 85, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Electric Power projection Data application/vnd.ms-excel icon AEO2011: Electric Power Projections for EMM Region - SERC Reliability Corporation / Gateway - Reference Case (xls, 259 KiB)

37

PJM Interconnection, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

LLC Smart Grid Project LLC Smart Grid Project Jump to: navigation, search Project Lead PJM Interconnection, LLC Country United States Headquarters Location Norristown, Pennsylvania Additional Benefit Places Illinois, Indiana, Kentucky, Maryland, Michigan, North Carolina, New Jersey, Ohio, Pennsylvania, Virgin Islands, West Virginia Recovery Act Funding $13,698,091.00 Total Project Value $228203511 Coverage Area Coverage Map: PJM Interconnection, LLC Smart Grid Project Coordinates 40.121497°, -75.3399048° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

38

Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Initial Comments of PJM Interconnection, and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. On January 5, 2009, ITC Transmission filed with the Department of Energy a request to amend Presidential Permit PP-230-3, which authorizes ITC to own and operate specified electric transmission facilities at the Bunce Creek station that interconnect ITC with Hydro One Networks Inc electric transmission facilities at the Michigan-Ontario border. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of

39

Impact Of Renewable Energy Portfolio Standardson The Costof Solar And Wind Energyin Pjm.  

E-Print Network (OSTI)

??ABSTRACTRenewable portfolio standards (RPS) in PJM states place annual targets for generation from renewable sources of energy. These targets have impacts on the development of… (more)

Idrisu, Babatunde

2012-01-01T23:59:59.000Z

40

Robust Tomlinson-Harashima Precoders for Multiuser MISO Downlink with Imperfect CSI  

Science Conference Proceedings (OSTI)

In this paper, we consider robust non-linear precoding for the downlink of a multiuser multiple-input single-output (MISO) communication system in the presence of imperfect channel state information (CSI). The base station (BS) is equipped with multiple ... Keywords: Imperfect CSI, Multiuser MISO downlink, Tomlinson-Harashima precoder

P. Ubaidulla; A. Chockalingam

2010-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Answer of Potomac Electric Power Company and PJM lnterconnection, Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Docket No. EO-05-01: Pursuant to Rule 213 of the rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or "Commission"), 18 C.F.R. § 385.213, Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby answer the Motion of Robert G. Bumley, Director the Commonwealth of Virginia Department of Environmental Quality To Deny the District of Columbia Public Service

42

Response from PJM Interconnection LLC and Pepco to Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Interconnection LLC and Pepco to Department of PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Docket No. EO-05-01: This letter will respond to your request for information concerning the potential need for Potomac River Station generation under the three reliability "scenarios" outlined by PJM and PEPCO. Response from PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation More Documents & Publications Information Concerning Reliability Impacts under Various System

43

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for Pepco's two 230 kV circuits from the Palmers Comer to Potomac River substations pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC More Documents & Publications Special Environmental Analysis For Actions Taken under U.S. Department of

44

Response by PJM to letters from the City of Alexandria and the Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by PJM to letters from the City of Alexandria and the by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 Response by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 Docket No. EO-05-01: Following the release of the Department of Energy's Order No. 202-05-3 issued December 20, 2005 (the "Order"), both the Virginia Department of Environmental Quality ("DEQ") and the City of Alexandria (the "City") have filed letters asserting an imminent breach of the Order. PJM responds to those letters and takes issue both (i) with the assertion of an imminent breach of the Order, and (ii) the suggestion that maintenance of transmission facilities serving the District of Columbia be

45

arbitrage opportunities for energy efficiency resources in the PJM capacity market.  

E-Print Network (OSTI)

??This study examines the effect of Energy Efficiency Projects on the Pennsylvania–New Jersey–Maryland Interconnection (PJM) Reliability Pricing Model (RPM). In particular, it focuses on the… (more)

Nagy, Stefan

2013-01-01T23:59:59.000Z

46

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network (OSTI)

Abbreviations ADDF ALM AMR CSP DOE DR ELRP ETS EWH FERC HVa Curtailment Service Provider (CSP) at PJM’s request. LBNLof load control tests. The CSP collected hourly load data

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

47

MAP 5.50: PJM Service Area in Virginia PJM operates the electric transmission system in Virginia served by Allegheny Power (AP), American  

E-Print Network (OSTI)

(DOM), as shown on MAP 5.50. The transmission system in Virginia delivers power to customers from native generation resources and power transfers across tie-line facilities with the rest of the PJM and other adjoining systems to the west and south. Critical RTEP Issues in Virginia PJM continues to address a number of issues with a bearing on reliability in Virginia and the regional transmission expansion plans required to maintain it: A new 502 Junction-Mt. Storm-Meadowbrook-Loudoun 500kV transmission line is needed to avoid reliability criteria violations in 2011 and maintain power transfers to serve northern

unknown authors

2007-01-01T23:59:59.000Z

48

The aftermath of primary power and its implications for independent transmission in PJM  

Science Conference Proceedings (OSTI)

The recent decision by the Federal Energy Regulatory Commission in ''Primary Power'' will have fundamental ramifications for transmission investment in the far-reaching PJM footprint. This decision, which is pending on rehearing and will likely be appealed, will determine whether transmission projects that are entitled to regulated rate recovery under the PJM tariff can only be built by incumbent transmission owners and whether new independent transmission entities are limited to building transmission projects on a ''merchant'' basis. (author)

Farrah, Elias G.; Elstein, S. Shamai

2010-08-15T23:59:59.000Z

49

Energy Factors, Leasing Structure and the Market Price of Office Buildings in the U.S.  

E-Print Network (OSTI)

York (several hubs), Ontario, PJM, MISO, ERCOT South, Intocontract delivering into the PJM Western hub. Assuming thatpeak real-time prices posted by PJM Interconnection, LLC, on

Jaffee, Dwight; Stanton, Richard; Wallace, Nancy

2012-01-01T23:59:59.000Z

50

Energy Factors, Leasing Structure and the Market Price of Office Buildings in the U.S.  

E-Print Network (OSTI)

York (several hubs), Ontario, PJM, MISO, ERCOT South, Intocontract delivering into the PJM Western hub. Assuming thatpeak real-time prices posted by PJM Interconnection, LLC, on

Jaffee, Dwight M.; Stanton, Richard; Wallace, Nancy E.

2010-01-01T23:59:59.000Z

51

Geometric effects modelling for the PJM interconnection system. Part 1; Earth surface potentials computation  

Science Conference Proceedings (OSTI)

This paper describes an ionospheric source current model and development of an earth resistivity model used to calculate geomagnetic induced currents (GIC) on the Pennsylvania-New Jersey-Maryland Interconnection (PJM). Ionospheric current is modelled as a gaussian distributed current sheet above the earth. Geological details are included by dividing the PJM service area into 11 different earth resistivity regions. The resulting earth surface potential (ESP) at each power system substation is then calculated. A companion paper describes how this ESP is applied to the power system model to calculate the geomagnetic induced current in the power system equipment and facilities.

Towle, J.N. (Diversified EM, Seattle, WA (US)); Prabhakara, F.S. (Power Technologies, Inc., Schenectady, NY (US)); Ponder, J.Z. (PJM Interconnection, Norristown, PA (US))

1992-07-01T23:59:59.000Z

52

Power Act (“FPA”), 16 U.S.C. § 824d, hereby submits revisions to the PJM Open Access Transmission Tariff (“Tariff”), the Amended and Restated Operating Agreement of PJM  

E-Print Network (OSTI)

Agreement among Load Serving Entities in the PJM Region (“RAA”) to recognize and support, at the wholesale level, the development of price responsive demand (“PRD”)— demand reductions enabled by advanced meters and dynamic retail rate structures—by states in the PJM region. The enclosed revisions address PRD both in the context of PJM’s forward capacity market (known as the “Reliability Pricing Model ” or “RPM”) and PJM’s dayahead and real-time energy markets. For RPM, PJM plans to implement PRD for the capacity year that will be addressed by RPM’s next three-year forward Base Residual Auction 1 in May 2012. As explained in this filing, parties that wish to submit PRD load reduction plans to PJM for that capacity year must do so by January 15, 2012. PJM therefore requests that the enclosed revisions related to RPM (identified below) become effective on December 15, 2011, so that market participants have certainty about the rules in place as they develop and submit their PRD plans to PJM. While PJM’s three-year forward capacity structure means that PRD plans submitted for RPM will address only load reductions implemented on or after June 1, 2015, PJM and its stakeholders see no reason to defer the benefits of PRD in the energy market for three years. Accordingly, 1 The Base Residual Auction (or “BRA”), as defined in the Tariff, is the principal RPM auction, which secures commitments for capacity to be provided in a Delivery Year that begins approximately three years after the auction. See Tariff,

L. L. C. (“operating Agreement; The Reliability Assurance

2011-01-01T23:59:59.000Z

53

MISO Unlocks Billions in Savings Through the Application of Operations Research for Energy and Ancillary Services Markets  

Science Conference Proceedings (OSTI)

Over the past few years, the Midwest Independent Transmission System Operator, Inc. (MISO) has transformed the electric utility industry in 13 Midwestern US states through the development and implementation of energy and ancillary services markets. MISO ... Keywords: Lagrangian, OR in a region, demand, dynamic programming, electricity, energy, integer programming, linear programming, optimization, performance, planning, reliability, supply, transmission, values

Brian Carlson; Yonghong Chen; Mingguo Hong; Roy Jones; Kevin Larson; Xingwang Ma; Peter Nieuwesteeg; Haili Song; Kimberly Sperry; Matthew Tackett; Doug Taylor; Jie Wan; Eugene Zak

2012-01-01T23:59:59.000Z

54

Computational Needs for the Next Generation Electric Grid Proceedings  

E-Print Network (OSTI)

Ott, “Unit commitment in PJM”, Technical Conference on Unit The long? term planning at PJM and MISO in terms of wind as two  exceptions.  In the Midwest, PJM and MISO, and in 

Birman, Kenneth

2012-01-01T23:59:59.000Z

55

Evaluating Wind-Following and Ecosystem Services for Hydroelectric Dams in PJM  

Science Conference Proceedings (OSTI)

Hydropower can provide inexpensive, flexible fill-in power to compensate for intermittent renewable generation. We model the decision of a hydroelectric generator to shift power capacity away from the day-ahead energy market into a "wind-following" service ... Keywords: Hydroelectric power, wind, PJM, drought, energy policy

Alisha Fernandez; Seth Blumsack; Patrick Reed

2012-01-01T23:59:59.000Z

56

Reviewing progress in PJM's capacity market structure via the new reliability pricing model  

Science Conference Proceedings (OSTI)

The Reliability Pricing Model introduces significant changes to the capacity market structure of PJM. The main feature of the RPM design is a downward-sloping demand curve, which replaces the highly volatile vertical demand curve. The authors review the latest RPM structure, results of the auctions, and the future course of the implementation process. (author)

Sener, Adil Caner; Kimball, Stefan

2007-12-15T23:59:59.000Z

57

The impact of FERC orders on the value of bidders in PJM  

Science Conference Proceedings (OSTI)

A study of the responses of share prices of major bidders in the PJM auctions from the mid-1990s through 2006 finds statistically significant effects for some FERC decisions for a portfolio of bidders. In contrast to publicly stated policy objectives, the analysis shows that some FERC decisions significantly raised market expectations regarding the future profitability of bidders. (author)

Peters, Lon L.

2009-08-15T23:59:59.000Z

58

ON THE USAGE OF ANTENNAS IN MIMO AND MISO INTERFERENCE CHANNELS Mariam Kaynia  

E-Print Network (OSTI)

ON THE USAGE OF ANTENNAS IN MIMO AND MISO INTERFERENCE CHANNELS Mariam Kaynia , Andrea J. Goldsmith. of Science and Technology Dept. of Electrical Engineering, Stanford University, Stanford Mobile and small), we derive upper and lower bounds to both our per- formance metrics. Moreover, the particular

Gesbert, David

59

A comparative study of non linear MISO process modelling techniques: application to a chemical reactor  

Science Conference Proceedings (OSTI)

This paper proposes the design and a comparative study of two non linear Multiple Input Single Output (MISO) models. The first, titled Volterra model, is built using Volterra series and the second, named RKHS model, uses the Statistical Learning Theory ... Keywords: RKHS, Volterra, chemical reactor, statistical learning theory

Okba Taouali; Nabiha Saidi; Hassani Messaoud

2009-05-01T23:59:59.000Z

60

The role of the ISO in U.S. electricity markets: A review of restructuring in California and PJM  

Science Conference Proceedings (OSTI)

Despite their design differences, both the California and the Pennsylvania-New Jersey-Maryland (PJM) markets provide explicit roles for competition in the scheduling functions while allowing the independent system operator (ISO) to manage the spot market. Experience has shown that both can work. This article discusses the California and PJM approaches in an attempt to shed light on the controversy over the ISO`s role in pre-dispatch phases of the market. Section 1 describes the California market and Section 2 briefly review PJM. Section 3 outlines the costs and benefits associated with limiting the ISO`s role in the scheduling phases of the market. Section 4 summarizes recent experience in California and PJM and offers some conclusions.

Cameron, L. [Economics Resource Group, Boston, MA (United States); Cramton, P. [Univ. of Maryland, College Park, MD (United States)

1999-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

36.3. b. Order Relating to the PJM WH Real  

E-Print Network (OSTI)

After considering the complete record in this matter, including the comment letters received in response to its request for comments, the Commission has determined to issue the following Order: The Commission, pursuant to its authority under section 2(h)(7) of the Act, hereby determines that the PJM WH Real Time Off-Peak Daily contract, traded on the IntercontinentalExchange, Inc., does not at this time satisfy the material price preference or material liquidity criteria for significant price discovery contracts. Consistent with this determination, the IntercontinentalExchange, Inc., is not considered a registered entity 56 with respect to the PJM WH Real Time Off-Peak Daily contract and is not subject to the provisions of the Commodity Exchange Act applicable to registered entities. Further, the obligations, requirements and timetables prescribed in Commission rule 36.3(c)(4) governing core principle compliance by the IntercontinentalExchange, Inc., are not applicable to the PJM WH Real Time Off-Peak Daily contract with the issuance of this Order. This Order is based on the representations made to the Commission by the IntercontinentalExchange, Inc., dated

Time Off-peak; Daily Contract

2009-01-01T23:59:59.000Z

62

Contrasts in restructuring wholesale electric markets: England/Wales, California, and the PJM  

Science Conference Proceedings (OSTI)

The ways in which the British, the Californians, and the members of the Pennsylvania-Jersey-Maryland Pool (PJM) are restructuring their electric industries and designing markets provide fascinating political and technical contrasts with each other, particularly insofar as all three markets are roughly the same size, with energy sales of about 250--300 terawatt hours (TWh) annually. There have been significant differences in the drivers of change, objectives, and leadership, the legacies of the past, and the process of design, which are discussed in the first three sections. The fourth section describes the market designs in England and Wales, California, and the PJM, while the concluding section draws out the lessons of experience. While these lessons include specific principles regarding the objectives and structure of power exchanges, the maintenance of system stability and power transport, and the achieving of generation reliability, they also include several overarching conclusions. Perhaps chief among them, as will be clear from the discussion of the restructuring experience on both sides of the Atlantic, is that major restructurings can only be led by a public authority and will be successful in implementation only if that authority has a clear and realistic vision of where it wants to go.

Henney, A.

1998-08-01T23:59:59.000Z

63

Mid-summer heat pushes up natural gas use at electric power plants ...  

U.S. Energy Information Administration (EIA)

... revenue and prices, power plants, fuel use, ... four Regional Transmission Organizations—Midwest Independent System Operator (MISO), the PJM Interconnection ...

64

Independent review of estimated load reductions for PJM's small customer load response pilot project  

SciTech Connect

This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems significantly limit our ability to differentiate between control-related and non-control related differences in substation-level load shape data. The usefulness and accuracy of the results were hampered by operational problems encountered during the measurement period as well as in sufficient number of load research grade interval meters at one cooperative. Given the larger sample size at one electric cooperative and more statistically-robust results, there is some basis to suggest that the Adjusted Diversified Demand Factor (ADDF) values used by the CSP somewhat over-state the actual load reductions. Given the results and limitations of the M&V approach as implemented, we suggest several options for PJM to consider: (1) require load aggregators participating in ISODR programs to utilize formal PURPA-compliant load research samples in their M&V plans, and (2) continue developing lower cost M&V approaches for mass market load control programs that incorporate suggested improvements described in this study.

Heffner, G.; Moezzi, M.; Goldman, C.

2004-06-01T23:59:59.000Z

65

Deemed Savings Estimates for Legacy Air Conditioning and WaterHeating Direct Load Control Programs in PJM Region  

SciTech Connect

During 2005 and 2006, the PJM Interconnection (PJM) Load Analysis Subcommittee (LAS) examined ways to reduce the costs and improve the effectiveness of its existing measurement and verification (M&V) protocols for Direct Load Control (DLC) programs. The current M&V protocol requires that a PURPA-compliant Load Research study be conducted every five years for each Load-Serving Entity (LSE). The current M&V protocol is expensive to implement and administer particularly for mature load control programs, some of which are marginally cost-effective. There was growing evidence that some LSEs were mothballing or dropping their DLC programs in lieu of incurring the expense associated with the M&V. This project had several objectives: (1) examine the potential for developing deemed savings estimates acceptable to PJM for legacy air conditioning and water heating DLC programs, and (2) explore the development of a collaborative, regional, consensus-based approach for conducting monitoring and verification of load reductions for emerging load management technologies for customers that do not have interval metering capability.

Goldman, Charles

2007-03-01T23:59:59.000Z

66

Renewable Portfolio Standards in the United States - A Status Report with Data Through 2007  

E-Print Network (OSTI)

LSE MISO M-RETS MSW MW MWh PJM POU PRC PSC PUC PV REC RPSelectric service provider PJM Generation Attributes Trackingwaste megawatt megawatt-hour PJM Interconnection publicly

Wiser, Ryan

2008-01-01T23:59:59.000Z

67

Mass Market Demand Response and Variable Generation Integration Issues: A Scoping Study  

E-Print Network (OSTI)

Analysis. Presentation given to PJM Interconnection Markete.g. , ISO-NE, NYISO, PJM, MISO, ERCOT, and CAISO). Co-also elect to participate in PJM’s day-ahead and/or real-

Cappers, Peter

2012-01-01T23:59:59.000Z

68

A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies  

E-Print Network (OSTI)

the Creation of a Single MISO-PJM-SPP Power Market. ISO-NE/Power‘s Participation in PJM. SAIC. 2004. The Benefits andDominion Virginia Power Joining PJM. Henwood. 2004. Study of

Eto, Joseph H.; Lesieutre, Bernard C.

2005-01-01T23:59:59.000Z

69

Designing Electricity Markets with Large Shares of Wind Power  

E-Print Network (OSTI)

-time (RT) prices in Iowa (MEC interface), May 11­17, 2009. MISO NYISO PJM ERCOT CAISO Wind Power Capacity) and PJM have already introduced rules for mandatory real-time bidding and control of wind power

Kemner, Ken

70

www.eia.gov  

U.S. Energy Information Administration (EIA)

PJM SERC SPP TRE WECC Contiguous U.S. Actual 2011 / 2012 Projected 2012 / 2013 Projected 2013 / 2014 Projected 2014 / 2015 Projected 2015 / 2016 Projected 2016 / 2017

71

www.eia.gov  

U.S. Energy Information Administration (EIA)

PJM SERC SPP TRE WECC Contiguous U.S. Actual 2011 Projected 2012 Projected 2013 Projected 2014 Projected 2015 Projected 2016 Notes: NERC region and reliability ...

72

Westar Energy Inc | Open Energy Information  

Open Energy Info (EERE)

Westar Energy Inc Westar Energy Inc Jump to: navigation, search Name Westar Energy Inc Place Topeka, Kansas Utility Id 22500 Utility Location Yes Ownership I NERC Location SPP NERC ERCOT Yes NERC MRO Yes NERC RFC Yes NERC SERC Yes NERC SPP Yes ISO Ercot Yes RTO PJM Yes RTO SPP Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] SGIC[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Westar Energy, Inc. Smart Grid Project was awarded $19,041,565 Recovery Act

73

Westar Energy Inc | Open Energy Information  

Open Energy Info (EERE)

Westar Energy Inc Westar Energy Inc (Redirected from Kansas Gas & Electric Co) Jump to: navigation, search Name Westar Energy Inc Place Topeka, Kansas Utility Id 22500 Utility Location Yes Ownership I NERC Location SPP NERC ERCOT Yes NERC MRO Yes NERC RFC Yes NERC SERC Yes NERC SPP Yes ISO Ercot Yes RTO PJM Yes RTO SPP Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] SGIC[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it.

74

Tenaska Power Services Co | Open Energy Information  

Open Energy Info (EERE)

Tenaska Power Services Co Tenaska Power Services Co Jump to: navigation, search Name Tenaska Power Services Co Place Texas Utility Id 18995 Utility Location Yes Ownership R NERC Location TRE NERC ERCOT Yes NERC MRO Yes NERC SERC Yes NERC SPP Yes ISO Ercot Yes RTO PJM Yes RTO SPP Yes ISO MISO Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Commercial: $0.0612/kWh Industrial: $0.0459/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

75

Tenaska Power Services Co | Open Energy Information  

Open Energy Info (EERE)

(Redirected from Tenaska) (Redirected from Tenaska) Jump to: navigation, search Name Tenaska Power Services Co Place Texas Utility Id 18995 Utility Location Yes Ownership R NERC Location TRE NERC ERCOT Yes NERC MRO Yes NERC SERC Yes NERC SPP Yes ISO Ercot Yes RTO PJM Yes RTO SPP Yes ISO MISO Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Commercial: $0.0612/kWh Industrial: $0.0459/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

76

Wabash Valley Power Assn, Inc | Open Energy Information  

Open Energy Info (EERE)

Wabash Valley Power Assn, Inc Wabash Valley Power Assn, Inc Place Indiana Utility Id 40211 Utility Location Yes Ownership C NERC Location RFC,SERC NERC RFC Yes RTO PJM Yes ISO MISO Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Wabash_Valley_Power_Assn,_Inc&oldid=412136

77

JP Morgan | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name JP Morgan Place Texas Utility Id 56528 Utility Location Yes Ownership R NERC ERCOT Yes NERC FRCC Yes NERC MRO Yes NERC NPCC Yes NERC RFC Yes NERC SERC Yes NERC SPP Yes NERC WECC Yes ISO CA Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes RTO SPP Yes ISO MISO Yes ISO NE Yes ISO Other Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=JP_Morgan&oldid=410888

78

Word Pro - Untitled1  

U.S. Energy Information Administration (EIA) Indexed Site

a Electric Noncoincident Peak Load and Capacity Margin: Summer Peak Period a Electric Noncoincident Peak Load and Capacity Margin: Summer Peak Period U.S.¹ Summer Peak Load,² All Interconnections, 1986-2011 Summer Capacity Margin, 1996-2011 U.S.¹ Summer Peak Load² by NERC³ Regional Assessment Area, 2011 262 U.S. Energy Information Administration / Annual Energy Review 2011 1 United States excluding Alaska and Hawaii. 2 See "Noncoincident Peak Load" in Glossary. 3 See "North American Electric Reliability Corporation (NERC)" in Glossary. Notes: * Values for 2011 are forecast. * The summer peak period is June through September. Source: Table 8.12a. 1986 1989 1992 1995 1998 2001 2004 2007 2010 0 300 600 900 Gigawatts 1996 1998 2000 2002 2004 2006 2008 2010 0 5 10 15 20 25 Percent 46 60 5 98 149 165 53 64 131 FRCC NPCC MAPP MISO PJM SERC SPP TRE

79

Table of Contents PJM Manual [18]: PJM Capacity Market  

E-Print Network (OSTI)

Table of Contents Table of Contents..................................................................................................... ii

unknown authors

2008-01-01T23:59:59.000Z

80

Microsoft Word - Chicago Transcript 10 07 08 FINAL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

is considered in the transmission planning process in both MISO and PJM in terms of their 20-year horizons. So to the extent that we can be cognizant of those developments and...

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Champion Energy Services | Open Energy Information  

Open Energy Info (EERE)

Champion Energy Services Place Texas Utility Id 54862 Utility Location Yes Ownership R NERC ERCOT Yes NERC RFC Yes ISO Ercot Yes RTO PJM Yes ISO MISO Yes Activity Retail Marketing...

82

City of Carmi, Illinois (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

M NERC Location RFC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for...

83

City of Breese, Illinois (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

M NERC Location RFC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for...

84

PJM Manual 10: Pre-Scheduling Operations  

E-Print Network (OSTI)

Table of Contents Table of Contents..................................................................................................... ii

unknown authors

2008-01-01T23:59:59.000Z

85

Analysis of PJM's Transmissions Rights Market  

Science Conference Proceedings (OSTI)

As power industry restructuring continues, more and more industry participants are likely to be exposed to financial uncertainties created by locational marginal prices (LMPs). These uncertainties differ from those experienced under traditional regulation and also differ from the resource adequacy-related price spikes that were experienced in the Midwest in 1998 and in the West during 2000-2001. Instead, LMP systems create uncertainty in the cost of transporting power from resources to loads. This is an ...

2004-12-21T23:59:59.000Z

86

Word Pro - Untitled1  

U.S. Energy Information Administration (EIA) Indexed Site

4 4 U.S. Energy Information Administration / Annual Energy Review 2011 Table 8.12a Electric Noncoincident Peak Load and Capacity Margin: Summer Peak Period, 1986-2011 (Megawatts, Except as Noted) Year Noncoincident Peak Load 1 by North American Electric Reliability Corporation (NERC) 2 Regional Assessment Area Capacity Margin 21 (percent) Eastern Interconnection ERCOT 4 Western Inter- connection All Inter- connections FRCC 5 NPCC 6 Balance of Eastern Region 3 ECAR 7,8 MAAC 8,9 MAIN 8,10 MAPP 11 MISO 12 MRO 13 PJM 14 RFC 8,15 SERC 16 SPP 17 Subtotal TRE 18 WECC 19 Total 20 1986 - - 39,026 69,606 37,564 35,943 - - - - 21,029 - - - - 105,570 47,123 316,835 39,335 81,787 476,983 NA 1987 - - 42,651 72,561 40,526 37,446 - - - - 23,162 - - - - 109,798 47,723 331,216 39,339 82,967

87

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

A. Summer Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Assessment Area, A. Summer Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Assessment Area, 2002 - 2012, Actual Net Internal Demand (Megawatts) -- Summer Eastern Interconnection ERCOT Western Interconnection All Interconnections Period FRCC NPCC Balance of Eastern Region ECAR MAAC MAIN MAPP MISO MRO PJM RFC SERC SPP TRE WECC Contiguous U.S. 2002 37,951 55,164 430,396 101,251 54,296 53,267 -- -- 28,825 -- -- 154,459 38,298 55,833 117,032 696,376 2003 40,387 53,936 422,253 98,487 53,566 53,617 -- -- 28,775 -- -- 148,380 39,428 59,282 120,894 696,752 2004 42,243 51,580 419,349 95,300 52,049 50,499 -- -- 29,094 -- -- 153,024 39,383 58,531 121,205 692,908

88

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

B. Summer Net Internal Demand, Capacity Resources, and Capacity Margins B. Summer Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Corporation Assessment Area, 2012 Actual, 2013-2017 Projected Net Internal Demand (Megawatts) -- Summer Eastern Interconnection ERCOT Western Interconnection All Interconnections Period FRCC NPCC Balance of Eastern Region MAPP MISO PJM SERC SPP TRE WECC Contiguous U.S. Actual 2012 44,338 58,319 469,273 4,967 96,769 156,319 158,041 53,177 66,548 130,465 768,943 Projected 2013 42,532 59,969 447,171 5,022 91,644 144,378 152,949 53,177 65,901 129,278 744,851 Projected 2014 43,142 60,654 448,912 5,161 92,331 144,497 152,843 54,080 67,592 128,200 748,499 Projected 2015 43,812 61,428 457,865 5,270 93,017 147,568 157,287 54,722 69,679 129,553 762,336

89

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

A. Net Energy for Load by North American Electric Reliability Corporation Assessment Area, A. Net Energy for Load by North American Electric Reliability Corporation Assessment Area, 2002 - 2012, Actual Net Energy (Thousands of Megawatthours) Eastern Interconnection ERCOT Western Interconnection All Interconnections Period FRCC NPCC Balance of Eastern Region ECAR MAAC MAIN MAPP MISO MRO PJM RFC SERC SPP TRE WECC Contiguous U.S. 2002 211,116 286,199 2,301,321 567,897 273,907 279,264 -- -- 150,058 -- -- 835,319 194,876 280,269 666,696 3,745,601 2003 219,021 288,791 2,255,233 545,109 276,600 267,068 -- -- 153,918 -- -- 826,964 185,574 283,868 664,754 3,711,667 2004 220,335 292,725 2,313,180 553,236 283,646 274,760 -- -- 152,975 -- -- 856,734 191,829 289,146 682,053 3,797,439 2005 226,544 303,607 2,385,461 -- -- -- -- -- 216,633 -- 1,005,226 962,054 201,548 299,225 685,624 3,900,461

90

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

A. Winter Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Assessment Area, A. Winter Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Assessment Area, 2002 - 2012, Actual Net Internal Demand (Megawatts) -- Winter Eastern Interconnection ERCOT Western Interconnection All Interconnections Period FRCC NPCC Balance of Eastern Region ECAR MAAC MAIN MAPP MISO MRO PJM RFC SERC SPP TRE WECC Contiguous U.S. 2002 / 2003 42,001 45,980 360,748 84,844 46,159 39,974 -- -- 23,090 -- -- 137,541 29,140 44,719 94,554 588,002 2003 / 2004 36,229 47,850 357,026 86,332 45,625 39,955 -- -- 24,042 -- -- 133,244 27,828 41,988 100,337 583,430 2004 / 2005 41,449 47,859 371,011 91,800 45,565 40,618 -- -- 24,446 -- -- 139,486 29,096 44,010 101,002 605,331

91

Word Pro - Untitled1  

U.S. Energy Information Administration (EIA) Indexed Site

5 5 Table 8.12b Electric Noncoincident Peak Load and Capacity Margin: Winter Peak Period, 1986-2011 (Megawatts, Except as Noted) Year Noncoincident Peak Load 1 by North American Electric Reliability Corporation (NERC) 2 Regional Assessment Area Capacity Margin 21 (percent) Eastern Interconnection ERCOT 4 Western Inter- connection All Inter- connections FRCC 5 NPCC 6 Balance of Eastern Region 3 ECAR 7,8 MAAC 8,9 MAIN 8,10 MAPP 11 MISO 12 MRO 13 PJM 14 RFC 8,15 SERC 16 SPP 17 Subtotal TRE 18 WECC 19 Total 20 1986 - - 37,976 64,561 32,807 28,036 - - - - 18,850 - - - - 101,849 33,877 279,980 28,730 76,171 422,857 NA 1987 - - 41,902 68,118 35,775 30,606 - - - - 19,335 - - - - 105,476 34,472 293,782 31,399 81,182 448,265 NA 1988 - - 42,951 67,771 36,363 30,631 - - - - 20,162 - - - -

92

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

B. Winter Net Internal Demand, Capacity Resources, and Capacity Margins B. Winter Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Corporation Assessment Area, 2012 Actual, 2013-2017 Projected Net Internal Demand (Megawatts) -- Winter Eastern Interconnection ERCOT Western Interconnection All Interconnections Period FRCC NPCC Balance of Eastern Region MAPP MISO PJM SERC SPP TRE WECC Contiguous U.S. Actual 2012 / 2013 36,409 45,545 386,359 4,925 74,430 122,566 149,359 35,079 46,909 101,706 616,927 Projected 2013 / 2014 43,384 46,008 399,149 5,385 75,320 132,229 145,657 40,558 51,435 107,341 647,317 Projected 2014 / 2015 44,060 46,090 403,883 5,500 76,252 134,742 146,130 41,259 53,742 109,418 657,192 Projected 2015 / 2016 44,596 46,184 408,927 5,563 77,058 137,338 147,201 41,767 55,346 110,814 665,866

93

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

B. Noncoincident Peak Load by North American Electric Reliability Corporation Assessment Area, B. Noncoincident Peak Load by North American Electric Reliability Corporation Assessment Area, 2012 Actual, 2013-2017 Projected Summer Peak Load (Megawatts) Eastern Interconnection ERCOT Western Interconnection All Interconnections Period FRCC NPCC Balance of Eastern Region MAPP MISO PJM SERC SPP TRE WECC Contiguous U.S. Actual 2012 44,338 58,319 468,092 5,051 96,769 154,339 161,687 50,246 66,548 130,465 767,762 Projected 2013 45,668 59,969 469,857 5,109 96,192 155,553 159,032 53,971 67,998 133,523 777,015 Projected 2014 46,338 60,654 475,005 5,249 96,879 158,717 159,457 54,703 69,289 132,731 784,017 Projected 2015 47,053 61,428 484,637 5,360 97,565 162,216 164,150 55,346 71,423 134,183 798,724

94

Wind Power Forecasting andWind Power Forecasting and Electricity Market Operations  

E-Print Network (OSTI)

Power Forecasting in Five U.S. Electricity Markets MISO NYISO PJM ERCOT CAISO Peak load 109,157 MW (7 ........................................................................................... 18 4 WIND POWER FORECASTING AND ELECTRICITY MARKET OPERATIONS............................................................ 18 4-1 Market Operation and Wind Power Forecasting in Five U.S. Electricity Markets .......... 21 #12

Kemner, Ken

95

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability...  

Open Energy Info (EERE)

Gateway This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook...

96

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability...  

Open Energy Info (EERE)

Southeastern This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy...

97

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability...  

Open Energy Info (EERE)

Delta This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook...

98

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability...  

Open Energy Info (EERE)

Virginia-Carolina This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual...

99

AEO2011: Renewable Energy Generation by Fuel - SERC Reliability...  

Open Energy Info (EERE)

Central This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook...

100

AEO2011: Electric Power Projections for EMM Region - SERC Reliability  

Open Energy Info (EERE)

unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category.
...

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

ASEO2011: Electric Power Projections for EMM Region - SERC Reliability  

Open Energy Info (EERE)

unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category.
...

102

TRANSPORT OF WASTE SIMULANTS IN PJM VENT LINES  

Science Conference Proceedings (OSTI)

The experimental work was conducted to determine whether there is a potential for waste simulant to transport or 'creep' up the air link line and contaminate the pulse jet vent system, and possibly cause long term restriction of the air link line. Additionally, if simulant creep occurred, establish operating parameters for washing down the line. The amount of the addition of flush fluids and mixer downtime must be quantified.

Qureshi, Z

2007-02-21T23:59:59.000Z

103

PJM shows how smart appliances could help stabilize power systems ...  

U.S. Energy Information Administration (EIA)

Applied to enough end-use appliances, this smart grid technology would allow generators to operate without moment-to-moment adjustments in output, thereby saving money.

104

Results from Case Studies of Pumped-Storage Plants  

Science Conference Proceedings (OSTI)

Detailed plant performance analyses were conducted using unit and plant performance characteristics and 1-minute plant operational data from 2008, 2009, and 2010 for five pumped-storage plants. These five case studies encompass three markets (MISO, NYISO, and PJM) and one non-market region (Southeast area). Owners for the five plants include three investor-owned utilities, one state power authority, and one federal power corporation. This report describes results from detailed performance analyses ...

2012-09-14T23:59:59.000Z

105

Effects of Markets and Operations on the Suboptimization of Pumped Storage and Conventional Hydroelectric Plants  

Science Conference Proceedings (OSTI)

Detailed plant performance analyses were conducted using unit performance data, market data, and plant operational data from 2008, 2009, and 2010 for five pumped storage plants and three conventional hydroelectric plants. These eight case studies encompass three markets (MISO, PJM, and NYISO) and two regions (Southeast area and Western area). Owners for the eight plants include three investor-owned utilities, two state power authorities, and one federal power corporation. This report expands on ...

2013-04-02T23:59:59.000Z

106

A review of market monitoring activities at U.S. independent system operators  

E-Print Network (OSTI)

PJM ..Commission), Joe Bowring (PJM), Greg Cook (CAISO), KevinJ. 2003. “Market Monitoring,” PJM Presentation, June 16.

Goldman, Charles; Lesieutre, Bernie C.; Bartholomew, Emily

2004-01-01T23:59:59.000Z

107

Electricity transmission congestion costs: A review of recent reports  

E-Print Network (OSTI)

Market Report: New York Electricity Markets. April. PJM (PJM Interconnection, LLC).2002. PJM Interconnection State of the Market Report 2001.

Lesieutre, Bernard C.; Eto, Joseph H.

2003-01-01T23:59:59.000Z

108

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: December 2011 Regional Wholesale Markets: December 2011 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the nation. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

109

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: January 2012 Regional Wholesale Markets: January 2012 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the nation. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

110

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: October 2011 Regional Wholesale Markets: October 2011 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the U.S. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

111

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: September 2011 Regional Wholesale Markets: September 2011 The United States. has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the U.S. The range of daily price and demand data is shown for the month of September 2011 and for the year ending on September 30, 2011. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest (Palo Verde) and

112

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: March 2012 Regional Wholesale Markets: March 2012 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the Nation. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

113

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: February 2012 Regional Wholesale Markets: February 2012 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the Nation. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

114

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: November 2011 Regional Wholesale Markets: November 2011 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the U.S. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

115

PJM 2011 1 Revision 19, Effective Date: 06/24/2011  

E-Print Network (OSTI)

hours) o WEA - Weather Services o WPF - Wind Power Forecast o CDS - Cost Development Subcommittee o PLS Black Start unit to conform to the definitions in the OATT o Carrying Charges o Cost Based Offers o Direct Costs o Economic Demand Response o Emergency Demand Response o Energy Market Opportunity Costs o

Tesfatsion, Leigh

116

Managing Locational Basis Risk in a Nodal Power Market: A PJM Case Study  

Science Conference Proceedings (OSTI)

The physics of power flows in a congested transmission network can lead to dramatic differences in the value of electric power at different network locations. These cost differences have led a number of market designers to establish systems by which electricity prices vary by location. This report presents a case study demonstrating the effectiveness of an EPRI approach for designing hedges of locational basis risk due to transmission congestion when firm transmission rights (FTRs) are not available.

2001-12-03T23:59:59.000Z

117

The Fundamentals of Locational Marginal Pricing (LMP): Examples of Pricing Outcomes on the PJM System  

Science Conference Proceedings (OSTI)

As power industry restructuring continues, more and more industry participants will be exposed to financial uncertainties created by locational marginal pricing. These uncertainties differ from those experienced under traditional regulation as well as from the resource adequacy-related price spikes experienced in the Midwest in 1998 and in the West during 2000-2001. Instead, locational marginal pricing systems create uncertainty in the cost of transporting power from resources to loads. This report will ...

2003-12-15T23:59:59.000Z

118

Using restructured electricity markets in the hydrogen transition: The PJM case  

Science Conference Proceedings (OSTI)

We examine a hydrogen transition strategy of using excess electric generation capacity in the U.S. midatlantic states during off-peak hours to produce hydrogen via electrolysis. Four different generation technologies are evaluated: combined-cycle natural gas, nuclear power, clean coal, and pulverized coal. We construct hydrogen-electricity price curves for each technology and evaluate the resulting air emissions of key pollutants. Substantial capital investments may be avoided by leveraging off generation assets that would otherwise be built to produce electricity. We also account for the interaction between the production of hydrogen and wholesale electricity prices and demand. Results show that off-peak electrolysis is a plausible but not dominant strategy for hydrogen production; however, there may be a substantial real option value in using the electric power system to transition to a hydrogen economy that may exceed the direct cost savings of producing hydrogen by less expensive methods.

Felder, F.A.; Hajos, A. [Rutgers State University, New Brunswick, NJ (United States)

2006-10-15T23:59:59.000Z

119

Stochastic models of electricity prices and risk premia in the PJM market.  

E-Print Network (OSTI)

??With a main focus on risk premia in a US electricity market, we propose three stochastic models for electricity spot prices. Based on the proposed… (more)

Xiao, Yuewen

2012-01-01T23:59:59.000Z

120

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network (OSTI)

AMR CSP DOE DR ELRP ETS EWH FERC HV ISO LBNL M&V MV PURPAto participate, consistent with FERC policy direction. PJMLoad Response Program, FERC Electric Tariff First Revised

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network (OSTI)

customer mix and the number of customers with electric wateron a much- larger number (215) of customers, and despite thenumber of EWH program participants on each network: 631 customers

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

122

Northern Neck Elec Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Neck Elec Coop, Inc Neck Elec Coop, Inc Jump to: navigation, search Name Northern Neck Elec Coop, Inc Place Virginia Utility Id 13762 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 100 % Renewable Energy Attributes Electric Service Rider Residential Net Metering Rider SCHEDULE C-5-U CHURCH SERVICE Commercial SCHEDULE GS-3-U GENERAL SERVICE Industrial SCHEDULE LP-5-U LARGE POWER SERVICE Industrial SCHEDULE R-2-U RESIDENTIAL SERVICE Residential SCHEDULE T-1-U NON-DEMAND TOU SERVICE Commercial

123

Roanoke Electric Member Corp | Open Energy Information  

Open Energy Info (EERE)

Roanoke Electric Member Corp Roanoke Electric Member Corp Jump to: navigation, search Name Roanoke Electric Member Corp Place North Carolina Utility Id 16101 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Service Single Phase (energy charge only) Commercial Commercial Service Single-Phase > 100 kW Commercial Commercial Service Single-Phase < 100 kW Commercial Commercial Service Three Phase (energy charge only) Commercial Commercial Service Three Phase Demand/Energy equal too or >100 kW

124

City of Franklin, Virginia (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Virginia (Utility Company) Virginia (Utility Company) Jump to: navigation, search Name City of Franklin Place Virginia Utility Id 6715 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Church and synagogue service-Three phase Commercial Church and synagogue service-single phase Commercial General Service- Large Industrial General service-medium-single phase Industrial General service-medium-single phase-MGS-D Industrial General service-medium-three phase Industrial

125

Community Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Community Electric Coop Community Electric Coop Place Virginia Utility Id 4117 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Area Lighitng Floodlight 45,000 Lumen Lighting Area Lighting Floodlight 24,700 Lumen Lighting Area Lighting Security Light 8,500 Lumen Lighting Schedule A- Residential Service Residential Schedule A-U - Residential Service Residential Schedule A-U-RA - Residential Service (Retail Access) Residential Schedule B- General Service (Three phase service) Commercial

126

Northern Virginia Elec Coop | Open Energy Information  

Open Energy Info (EERE)

Northern Virginia Elec Coop Northern Virginia Elec Coop Place Manassas, Virginia Utility Id 13640 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Northern Virginia Electric Cooperative Smart Grid Project was awarded $5,000,000 Recovery Act Funding with a total project value of $10,000,000. Utility Rate Schedules Grid-background.png Interruptible Service Rider - Rider IS-1 Schedule DPS, Delivery Point Service (Unbundled Rate) Commercial Schedule HV-1 Large Power Dedicated Distribution Service Commercial

127

Town of Windsor, North Carolina (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Windsor Windsor Place North Carolina Utility Id 20811 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large General Service Commercial Residential- Inside Corporate Limits Residential Residential- Outside Corporate Limits Residential Small General Service Commercial Average Rates Residential: $0.1020/kWh Commercial: $0.0968/kWh Industrial: $0.0837/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Town_of_Windsor,_North_Carolina_(Utility_Company)&oldid=411851

128

North Carolina El Member Corp | Open Energy Information  

Open Energy Info (EERE)

Member Corp Member Corp Jump to: navigation, search Name North Carolina El Member Corp Place North Carolina Utility Id 13683 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=North_Carolina_El_Member_Corp&oldid=411205"

129

Town of Culpeper, Virginia (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Culpeper, Virginia (Utility Company) Culpeper, Virginia (Utility Company) Jump to: navigation, search Name Town of Culpeper Place Virginia Utility Id 4619 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service- Large Industrial General service-medium Industrial General service-small-Three phase Commercial General service-small-Three phase-Industrial Industrial General service-small-single phase Commercial General service-small-single phase-Industrial Industrial

130

Northern Virginia Elec Coop | Open Energy Information  

Open Energy Info (EERE)

Elec Coop Elec Coop (Redirected from NOVEC) Jump to: navigation, search Name Northern Virginia Elec Coop Place Manassas, Virginia Utility Id 13640 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Northern Virginia Electric Cooperative Smart Grid Project was awarded $5,000,000 Recovery Act Funding with a total project value of $10,000,000. Utility Rate Schedules Grid-background.png Interruptible Service Rider - Rider IS-1 Schedule DPS, Delivery Point Service (Unbundled Rate) Commercial

131

South Carolina Electric&Gas Co | Open Energy Information  

Open Energy Info (EERE)

Electric&Gas Co Electric&Gas Co Jump to: navigation, search Name South Carolina Electric&Gas Co Place South Carolina Utility Id 17539 Utility Location Yes Ownership I NERC Location SERC NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Bundled Services Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 16 (General Service Time-Of-Use) Commercial

132

Central Virginia Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Coop Coop Jump to: navigation, search Name Central Virginia Electric Coop Place Virginia Utility Id 3291 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes RTO PJM Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Service Commercial Farm and Home Service Residential General Service Commercial Industrial Service Industrial Large Power Service Industrial Net Metering Rider Power Cost Adjustment Rider Renewable Energy Rider R Residential Street, Highway and Homestead Lighting Service-150 Watt HPS Traditional

133

Old Dominion Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Old Dominion Electric Coop Old Dominion Electric Coop Place Virginia Utility Id 40229 Utility Location Yes Ownership C NERC Location SERC NERC RFC Yes NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Old_Dominion_Electric_Coop&oldid=411269

134

City of Harrisonburg, Virginia (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Harrisonburg, Virginia (Utility Company) Harrisonburg, Virginia (Utility Company) Jump to: navigation, search Name Harrisonburg City of Place Virginia Utility Id 8198 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service Commercial Large Industrial Service Industrial Large Light & Power Commercial Large Light & Power- Schedule 315 Industrial Residential Residential Average Rates Residential: $0.0828/kWh

135

Lewis County Rural E C A | Open Energy Information  

Open Energy Info (EERE)

Lewis County Rural E C A Lewis County Rural E C A Place Missouri Utility Id 10962 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes ISO MISO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Multi-Phase (Under 55 kVA) Commercial General Outdoor Lighting Lighting Large Power(Over 55 kVA) Industrial Residential Single-Phase Residential Average Rates Residential: $0.1120/kWh Commercial: $0.0766/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Lewis_County_Rural_E_C_A&oldid=410984

136

Ameren Illinois Company | Open Energy Information  

Open Energy Info (EERE)

Ameren Illinois Company Ameren Illinois Company (Redirected from Ameren Illinois) Jump to: navigation, search Name Ameren Illinois Company Place Missouri Service Territory Missouri Website www.ameren.com/sites/aue/ Green Button Landing Page www.ameren.com/sites/aue/ Green Button Reference Page www.whitehouse.gov/blog/2 Green Button Implemented Yes Utility Id 56697 Utility Location Yes Ownership I NERC Location SERC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it.

137

City of Centralia, Missouri (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Centralia City of Centralia City of Place Missouri Utility Id 3296 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes ISO MISO Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 175 watt lights Lighting 250 watt lights Lighting 400 watt lights Lighting Commercial Commercial Industrial Industrial RESIDENTIAL Residential Average Rates Residential: $0.0879/kWh Commercial: $0.1090/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=City_of_Centralia,_Missouri_(Utility_Company)&oldid=409430

138

Adams Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Coop Coop Place Illinois Utility Id 97 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes ISO MISO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Rate Schedule A General Purpose- Single Phase Commercial Rate Schedule A-Tod-Grain Drying (General Purpose-Single Purpose) Commercial Rate Schedule A-Tod-Residential (General Purpose-Single Purpose Time of day) Residential Rate Schedule B General Purpose-Three Phase Commercial Rate Schedule B-Tod-Grain Drying(General Purpose-Three Phase)Time of Day Residential Rate Schedule CAC (Controlled Air Conditioning) Commercial

139

Union Electric Co | Open Energy Information  

Open Energy Info (EERE)

Ameren Missouri) Ameren Missouri) Jump to: navigation, search Name Union Electric Co Place Missouri Utility Id 19436 Utility Location Yes Ownership I NERC Location SERC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 1(M) Residential Service Rate Residential 1(M)TOD-Residential Time Of Day Residential 2(M)-TOD Small General Service Time of Day 3 phase Commercial

140

Ameren Illinois Company | Open Energy Information  

Open Energy Info (EERE)

Ameren Illinois Company Ameren Illinois Company Jump to: navigation, search Name Ameren Illinois Company Place Missouri Service Territory Missouri Website www.ameren.com/sites/aue/ Green Button Landing Page www.ameren.com/sites/aue/ Green Button Reference Page www.whitehouse.gov/blog/2 Green Button Implemented Yes Utility Id 56697 Utility Location Yes Ownership I NERC Location SERC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

City of Springfield, Illinois (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Springfield, Illinois (Utility Company) Springfield, Illinois (Utility Company) Jump to: navigation, search Name City of Springfield Place Illinois Utility Id 17828 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Bundled Services Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service Large (Rate 48) Commercial General Service Medium (Rate 46) Commercial General Service Medium - Southern View (Rate 47) Commercial General Service Separate-Meter Space Heating (Rate 44) Commercial

142

Southwestern Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Southwestern Electric Coop Inc Southwestern Electric Coop Inc Place Illinois Utility Id 17697 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 3-Phase Small Power Service (Rate SP3P7, SP3P8) Commercial Electric Heat Rate (Rates ELH05) Commercial Electric Heat Rate With Street Lighting (Rates ELH06) Residential Farm Rate (Rate FRM17) Industrial Farm, Residential and Public buildings (RES01, RESO2, ANN04, PUB11)

143

City of Highland, Illinois (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Highland Highland Place Illinois Utility Id 8573 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Commercial Industrial Industrial Residential Residential Average Rates Residential: $0.0978/kWh Commercial: $0.1050/kWh Industrial: $0.0777/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=City_of_Highland,_Illinois_(Utility_Company)&oldid=409728

144

Mt Carmel Public Utility Co | Open Energy Information  

Open Energy Info (EERE)

Public Utility Co Public Utility Co Jump to: navigation, search Name Mt Carmel Public Utility Co Place Illinois Utility Id 13032 Utility Location Yes Ownership I NERC Location SERC NERC SERC Yes ISO MISO Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Service Commercial Commercial Electric Space Heating Service Commercial Large Light and Power Electric Service - Less Than 10 MW Industrial Large Light and Power Electric Service - equal or greater than 10 MW

145

City of Columbia, Missouri (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Columbia Columbia Place Missouri Utility Id 4045 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Industrial Electric Service Rate Industrial Large General Electric Service Rate Industrial Residential Electric Rates Residential Residential Heat Pump Rate Residential Small General Electric Service Rate - Single Phase Commercial Small General Electric Service Rate - Three Phase Commercial

146

Union Electric Co | Open Energy Information  

Open Energy Info (EERE)

Place Missouri Place Missouri Utility Id 19436 Utility Location Yes Ownership I NERC Location SERC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 1(M) Residential Service Rate Residential 1(M)TOD-Residential Time Of Day Residential 2(M)-TOD Small General Service Time of Day 3 phase Commercial 2(M)Small General Service 3 phase Commercial

147

Capacity Markets for Electricity  

E-Print Network (OSTI)

Reliability Assessment [19] PJM, Monitoring Market Unit (at http://www.pjm.com. [20] PJM, Monitoring Market Unit (at http://www.pjm.com. [21] PJM, Monitoring Market Unit (

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

148

Real Time Pricing as a Default or Optional Service for C&I Customers: A Comparative Analysis of Eight Case Studies  

E-Print Network (OSTI)

with PEPCO staff, November 23. PJM, 2005a, Personalcommunication with PJM staff, April 17.PJM, 2005b, “2004 State of the Market Report,” March 8.

Barbose, Galen; Goldman, Charles; Bharvirkar, Ranjit; Hopper, Nicole; Ting, Michael; Neenan, Bernie

2005-01-01T23:59:59.000Z

149

Selling Random Energy  

E-Print Network (OSTI)

of the increase in PJM regulating reserve requirements underof the increase in PJM regulating reserve requirements underpenetration scenario in the PJM interconnection (see Figure

Bitar, Eilyan Yamen

2011-01-01T23:59:59.000Z

150

2011 Wind Technologies Market Report  

E-Print Network (OSTI)

MWh NERC NREL NYISO OEM O&M PJM POU PPA PTC PUC REC RFI RPSoperations and maintenance PJM Interconnection publiclyis planned for the Midwest, PJM Interconnection, Texas,

Bolinger, Mark

2013-01-01T23:59:59.000Z

151

When a Rose Is Not a Rose: A Review of Recent Estimates of Congestion Costs  

E-Print Network (OSTI)

York Electricity Markets, April 2003. PJM Interconnection,LLC (2002), PJM Interconnection State of the MarketReport 2001, Report of the PJM Market Monitoring Unit, June

Lesieutre, Bernard C.; Eto, Joseph H.

2004-01-01T23:59:59.000Z

152

Vertical Integration in Restructured Electricity Markets: Measuring Market Efficiency and Firm Conduct  

E-Print Network (OSTI)

Stoft. 2000. “Monitoring the PJM Energy Market: SummerUnit (MMU). 2000-2001. PJM Interconnection State of theintegration of ?rms in the PJM market re- duces electricity

Mansur, Erin T.

2003-01-01T23:59:59.000Z

153

2010 Wind Technologies Market Report  

E-Print Network (OSTI)

MWh NERC NREL NYISO OEM O&M PJM POU PPA PTC PUC REC RFI RPSoperations and maintenance PJM Interconnection publiclyMidwest, Mountain, Texas, PJM Interconnection, Northwest,

Wiser, Ryan

2012-01-01T23:59:59.000Z

154

Analysis of Wind Power and Load Data at Multiple Time Scales  

E-Print Network (OSTI)

29   Appendix A. PJM Windat Multiple Time Scales Appendix A. PJM Wind Data The windpower data for the PJM control area cover the period January

Coughlin, Katie

2011-01-01T23:59:59.000Z

155

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

2004) Entrepreneur, “PJM scheduling software saves customersHerling, S. R. , VP-Planning, PJM, Norristown, PA, privateimplementations in the PJM markets,” HEPG Forty-Ninth

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

156

The Distributional and Environmental Effects of Time-Varying Prices in Competitive Electricity Markets  

E-Print Network (OSTI)

New Jersey and Maryland (PJM) electricity market. Consistentelectricity market known as PJM by constructing a simulationWe apply the model to the PJM electricity market, which

Holland, Stephen P.; MANSUR, ERIN T

2005-01-01T23:59:59.000Z

157

Optimal Real-time Dispatch for Integrated Energy Systems  

E-Print Network (OSTI)

Market Fundamentals – PJM – Historical RT hourly pricing. ”NOx NP NRC NREL OLS P&DC PJM PUCT PURPA PV RETScreen RReDCfollowing sources. Baltimore – PJM Interconnection clearing

Firestone, Ryan Michael

2007-01-01T23:59:59.000Z

158

2009 Wind Technologies Market Report  

E-Print Network (OSTI)

Midwest, Mountain, Texas, PJM, SPP, and Northwest regions.the The queues surveyed include PJM Interconnection, MidwestMidwest, Mountain, Texas, PJM, SPP, and Northwest regions:

Wiser, Ryan

2010-01-01T23:59:59.000Z

159

On the Efficiency of the New York Independent System Operator Market for Transmission Congestion Contracts  

E-Print Network (OSTI)

control areas (Ontario, PJM, New England, and Québec), andHydro-Québec New England Ontario PJM Table 14. NYISO TCCMaryland-New Jersey (PJM) Interconnection. Whereas the

Siddiqui, Afzal S.; Bartholomew, Emily S.; Marnay, Chris; Oren, Shmuel S.

2003-01-01T23:59:59.000Z

160

Option Value of Electricity Demand Response  

E-Print Network (OSTI)

Oakland CA, December. PJM Demand Side Response WorkingPrice Response Program a PJM Economic Load Response ProgramLoad Response Statistics PJM Demand Response Working Group

Sezgen, Osman; Goldman, Charles; Krishnarao, P.

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements  

E-Print Network (OSTI)

rebatesincentives/ief/ PJM Forward Market Operations 2010. "PJM Manual 18B: Energy Efficiency Measurement &Independent System Operator 13 and PJM Regional Transmission

Schiller, Steven R.

2011-01-01T23:59:59.000Z

162

The relationship between policy choice and the size of the policy region: Why small jurisdictions may prefer renewable energy policies to reduce CO2 emissions  

E-Print Network (OSTI)

Pennsylvania Jersey Maryland (PJM) Interconnection, coveringapproximately 1/4 of the PJM market, MassachusettsMarket (e.g. Virginia in the PJM Market) CES RPS Percentage

Accordino, Megan H.; Rajagopal, Deepak

2012-01-01T23:59:59.000Z

163

Factors driving wind power development in the United States  

E-Print Network (OSTI)

able to move forward in the PJM ISO because scheduling andresources. For example, the PJM market operates withoutmarket. 75 In addition, PJM is a relatively liquid spot

Bird, Lori A.; Parsons, Brian; Gagliano, Troy; Brown, Matthew H.; Wiser, Ryan H.; Bolinger, Mark

2003-01-01T23:59:59.000Z

164

Developing State and National Evaluation Infrastructures- Guidance for the Challenges and Opportunities of EM&V  

E-Print Network (OSTI)

rtfAdmin@nwcouncil.org PJM Forward Market Operations 2010. "PJM Manual 18B: Energy Efficiency Measurement &such as ISO New England and PJM Regional Transmission

Schiller, Steven R.

2012-01-01T23:59:59.000Z

165

The Treatment of Renewable Energy Certificates, Emissions Allowances, and Green Power Programs in State Renewables Portfolio Standards  

E-Print Network (OSTI)

systems (NEPOOL GIS and PJM-EIS GATS) and three statein New England and the PJM region (see below for discussionmanual manual NEPOOL GIS PJM-EIS GATS PJM-EIS GATS manual

Holt, Edward A.; Wiser, Ryan H.

2007-01-01T23:59:59.000Z

166

Demand Response in U.S. Electricity Markets: Empirical Evidence  

E-Print Network (OSTI)

22, 2009. Norristown, PA: PJM Interconnection, LLC, 2009.opennat.asp? fileID=11833372 PJM Interconnection, LLC.ISO New England (ISO-NE), and PJM Interconnection (PJM). The

Cappers, Peter

2009-01-01T23:59:59.000Z

167

Microsoft PowerPoint - Herling.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 1 Congestion and the PJM Regional Transmission Plan Steven R. Herling Vice President, Planning PJM Interconnection March 25, 2009 PJM2009 2 PJM as Part of the Eastern...

168

DTE Energy Trading, Inc | Open Energy Information  

Open Energy Info (EERE)

Trading, Inc Trading, Inc Jump to: navigation, search Name DTE Energy Trading, Inc Place Michigan Utility Id 25262 Utility Location Yes Ownership W NERC Location RFC NERC ERCOT Yes NERC RFC Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes ISO MISO Yes ISO NE Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=DTE_Energy_Trading,_Inc&oldid=410556"

169

HQ Energy Services (US), Inc | Open Energy Information  

Open Energy Info (EERE)

HQ Energy Services (US), Inc HQ Energy Services (US), Inc Jump to: navigation, search Name HQ Energy Services (US), Inc Place Connecticut Utility Id 21249 Utility Location Yes Ownership W NERC Location NPCC NERC NPCC Yes RTO PJM Yes ISO NY Yes ISO MISO Yes ISO NE Yes Activity Generation Yes Activity Buying Transmission Yes Activity Buying Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from

170

Conectiv Energy Supply Inc. | Open Energy Information  

Open Energy Info (EERE)

Supply Inc. Supply Inc. (Redirected from Conectiv Energy Services Inc) Jump to: navigation, search Name Conectiv Energy Supply Inc. Place Delaware Utility Id 4318 Utility Location Yes Ownership W NERC RFC Yes RTO PJM Yes ISO NY Yes ISO MISO Yes ISO NE Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Conectiv_Energy_Supply_Inc.&oldid=412242"

171

NRG Power Marketing LLC | Open Energy Information  

Open Energy Info (EERE)

Marketing LLC Marketing LLC Jump to: navigation, search Name NRG Power Marketing LLC Place New Jersey Utility Id 56784 Utility Location Yes Ownership W ISO CA Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes RTO SPP Yes ISO MISO Yes ISO NE Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=NRG_Power_Marketing_LLC&oldid=411141

172

Liberty Power Corp. | Open Energy Information  

Open Energy Info (EERE)

Corp. Corp. (Redirected from Liberty Power) Jump to: navigation, search Name Liberty Power Corp. Place Florida Utility Id 55781 Utility Location Yes Ownership R ISO CA Yes ISO Ercot Yes RTO PJM Yes ISO NY Yes ISO MISO Yes ISO NE Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Liberty_Power_Corp.&oldid=410985" Categories: EIA Utility Companies and Aliases

173

American Mun Power-Ohio, Inc | Open Energy Information  

Open Energy Info (EERE)

Power-Ohio, Inc Power-Ohio, Inc Jump to: navigation, search Name American Mun Power-Ohio, Inc Place Ohio Utility Id 40577 Utility Location Yes Ownership A NERC Location RFC NERC RFC Yes RTO PJM Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=American_Mun_Power-Ohio,_Inc&oldid=408975"

174

Helping our members work together to keep the lights on today and in the future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISO/RTO ISO/RTO Challenges and Opportunites DOE Transmission Workshop Crystal City, VA November 1, 2012 Carl Monroe, EVP & COO cmonroe@spp.org · 501.614.3218 Independent System Operator (ISO) / Regional Transmission Organization (RTO) Map 3 California ISO Southwest Power Pool Alberta Electric System Operator MISO Electric Reliability Council of Texas PJM Interconnection New York ISO ISO New England Ontario Independent Electricity System Operator New Brunswick System Operator Improving Visibility and Understanding 4 This August 2011 storm caused more than a dozen concurrent transmission and generation outages Improving Visibility and Understanding 5 SPP kept the lights on, but at what cost? How can we use technology and data to implement better

175

Indiana Municipal Power Agency | Open Energy Information  

Open Energy Info (EERE)

Municipal Power Agency Municipal Power Agency Place Indiana Utility Id 9234 Utility Location Yes Ownership A NERC Location RFC NERC RFC Yes RTO PJM Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Indiana_Municipal_Power_Agency&oldid=41086

176

Wealth Transfers Among Large Customers from Implementing Real-Time Retail Electricity Pricing  

E-Print Network (OSTI)

Available at http://www.ucei.org. PJM Interconnection Marketmarket-monitor/downloads/mmu- reports/pjm-som-2004.pdf.

Borenstein, Severin

2007-01-01T23:59:59.000Z

177

The evolution of postpollination reproductive isolation in Costus  

E-Print Network (OSTI)

Evol Biol 18:568 Maas PJM (1972) Costoideae (Zingiberaceae).New York, USA Maas PJM (1977) Renealmia (Zingiberaceae-

Yost, Jenn M.; Kay, Kathleen M.

2009-01-01T23:59:59.000Z

178

Kentucky Utilities Co | Open Energy Information  

Open Energy Info (EERE)

Kentucky Kentucky Utility Id 10171 Utility Location Yes Ownership I NERC SERC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png GS (General Service) 3 phase Commercial PS (Power Service Secondary) Commercial RS Residential TODS (Time-Of-Day-Secondary Service) Commercial Average Rates Residential: $0.0754/kWh Commercial: $0.0731/kWh Industrial: $0.0557/kWh

179

Tideland Electric Member Corp | Open Energy Information  

Open Energy Info (EERE)

Tideland Electric Member Corp Tideland Electric Member Corp Jump to: navigation, search Name Tideland Electric Member Corp Place North Carolina Utility Id 19108 Utility Location Yes Ownership C NERC SERC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Cotton Gin - On season Commercial Large Power (Time-of-use Service) Commercial Large Power Service Commercial NC GreenPower NC GreenPower Generator- Small Solar PV Systems - 5 to 10 kW NC GreenPower Generator- Small Solar PV Systems - Less than 5 kW NC GreenPower Generator-Small Wind Systems - 10 kW and under

180

Illinois Rural Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Rural Electric Coop Rural Electric Coop Jump to: navigation, search Name Illinois Rural Electric Coop Place Illinois Utility Id 9209 Utility Location Yes Ownership C NERC Location RFC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png A Rate Commercial B Rate Commercial Irrigation Rate Commercial Large Power Rate Commercial Large Power- Interruptible Commercial Average Rates Residential: $0.1420/kWh Commercial: $0.1090/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Prairie Power, Inc | Open Energy Information  

Open Energy Info (EERE)

(Redirected from Soyland Power Coop Inc) (Redirected from Soyland Power Coop Inc) Jump to: navigation, search Name Prairie Power, Inc Place Illinois Utility Id 40307 Utility Location Yes Ownership C NERC Location Gateway NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Prairie_Power,_Inc&oldid=41229

182

Southern Illinois Power Coop | Open Energy Information  

Open Energy Info (EERE)

Southern Illinois Power Coop Southern Illinois Power Coop Place Illinois Utility Id 17632 Utility Location Yes Ownership C NERC Location SERC NERC RFC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Southern_Illinois_Power_Coop&oldid=411567

183

Village of Chatham, Illinois (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Illinois (Utility Company) Illinois (Utility Company) Jump to: navigation, search Name Village of Chatham Place Illinois Utility Id 3405 Utility Location Yes Ownership M NERC SERC Yes ISO MISO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Service with Demand (EN01 and EN03 and DM01 and DM03), Three Phase Commercial Commercial Service with Demand (EN01 and EN03 and DM01 and DM03), Single Phase Commercial Commercial Service without Demand (ER01 and ER04), Single Phase Commercial Commercial Service without Demand (ER01 and ER04), Three Phase Commercial

184

Coles-Moultrie Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Coles-Moultrie Electric Coop Coles-Moultrie Electric Coop Jump to: navigation, search Name Coles-Moultrie Electric Coop Place Illinois Utility Id 3931 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes NERC SERC Yes ISO MISO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png RIDER EA Electric Heat and Air Conditioning Rate Residential Rider A Controlled Air Conditioning Rate Residential Rider E Electric Heat Rate (Without Central Air Conditioning) Residential SCHEDULE EHA All-Electric Controlled Residential Apartments Commercial SCHEDULE SLS Security Lighting Service- 100 Watt Sodium Vapor Unmetered

185

City of Farmer City, Illinois (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Farmer City, Illinois (Utility Company) Farmer City, Illinois (Utility Company) Jump to: navigation, search Name City of Farmer City Place Illinois Utility Id 6192 Utility Location Yes Ownership M NERC Location RFC NERC SERC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Alt Electric Rate Commercial Commercial Electric Rate Commercial Commercial rate CI-D Industrial Electric Rate-School Commercial Electric rate- Municipal Commercial Grain Drying Rate Commercial Outdoor Lighting 100 W HPS Lighting

186

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec 8, 2011 in support of Settlement Agreement  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S - Canada border.

187

Overview of Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 PJM 08 PJM www.pjm.com ©2003 PJM Overview of Demand Response PJM ©2008 PJM www.pjm.com ©2003 PJM Growth, Statistics, and Current Footprint AEP, Dayton, ComEd, & DUQ Dominion Generating Units 1,200 + Generation Capacity 165,000 MW Peak Load 144,644 MW Transmission Miles 56,070 Area (Square Miles) 164,250 Members 500 + Population Served 51 Million Area Served 13 States and DC Generating Units 1,200 + Generation Capacity 165,000 MW Peak Load 144,644 MW Transmission Miles 56,070 Area (Square Miles) 164,250 Members 500 + Population Served 51 Million Area Served 13 States and DC Current PJM RTO Statistics Current PJM RTO Statistics PJM Mid-Atlantic Integrations completed as of May 1 st , 2005 ©2008 PJM

188

The potential impact of renewable energy deployment on natural gas prices in New England  

E-Print Network (OSTI)

England, NY, and portions of PJM). While we recommend thatRef: Consumption all Northeast/PJM States (Bcf) EERE:Consumption all Northeast/PJM States (Bcf) change in

Wiser, Ryan; Bolinger, Mark

2004-01-01T23:59:59.000Z

189

ELECTRICITY FORWARD PRICES: A High-Frequency Empirical Analysis  

E-Print Network (OSTI)

electricity prices reported by PJM. Prices are reported inNew Jersey, Maryland (PJM) electricity market for the periodusing the high-frequency PJM data set and documenting risk-

Longstaff, Francis A; Wang, Ashley

2002-01-01T23:59:59.000Z

190

Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California  

E-Print Network (OSTI)

LBNL  Report  Number 58178.   [PJM 2007] Amended and Operating Agreement of PJM Interconnection LLC,  effective U.S.  ISO/RTOs (e.g. , NYISO, PJM, ISO?NE) in their DR 

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

2008-01-01T23:59:59.000Z

191

Customer Risk from Real-Time Retail Electricity Pricing: Bill Volatility and Hedgability  

E-Print Network (OSTI)

Orlando, FL: Dryden Press, 1988. PJM Interconnection Marketmonitor/downloads/mmu- reports/pjm-som-2004.pdf. FIGURE 1:gures are taken from the PJM (2005), pages 82-83. California

Borenstein, Severin

2007-01-01T23:59:59.000Z

192

Oligopoly Equilibria in Electricity Contract Markets  

E-Print Network (OSTI)

Market California New England PJM n b k c Table 2: Two Stagemarket. Cal. 99 New Eng. 99 PJM 99 Cal. 00 New Eng. 99 Price2004) covers only 1999 in PJM. For each hour t, I represent

Bushnell, James

2005-01-01T23:59:59.000Z

193

The Role of Demand Response in Default Service Pricing  

E-Print Network (OSTI)

every five minutes. The hourly PJM real time market price iscomposite five-minute prices. PJM also administers a day-and Pennsylvania use the PJM real-time market as the basis

Barbose, Galen; Goldman, Charles; Neenan, Bernie

2008-01-01T23:59:59.000Z

194

Who Owns Renewable Energy Certificates? An Exploration of Policy Options and Practice  

E-Print Network (OSTI)

GATS) being developed by PJM-Environmental InformationQFs by the utilities at the PJM billing rate (the marginalwas still under development by PJM (the BPU has subsequently

Holt, Edward A.; Wiser, Ryan; Bolinger, Mark

2006-01-01T23:59:59.000Z

195

Localized Plasticity in the Streamlined Genomes of Vinyl Chloride Respiring Dehalococcoides  

E-Print Network (OSTI)

Conceived and designed the experiments: PJM SFB FEL AMS.Performed the experiments: PJM SFB KMR.Analyzed the data: PJM SFB JAM JG KMR RW EG AL SH FEL AMS.

McMurdie, Paul J.

2010-01-01T23:59:59.000Z

196

Lessons from the California Electricity Crisis  

E-Print Network (OSTI)

market to that in the PJM (portions of Pennsylvania, Newof 1999, they found that the PJM experienced the greatestSaravia (2002) presented for PJM and New England, two ISOs

Wolak, Frank

2003-01-01T23:59:59.000Z

197

The Summer of 2006: A Milestone in the Ongoing Maturation of Demand Response  

E-Print Network (OSTI)

Response – What’s Happening in PJM? Demand Response: CaseEdison (ConEd) Mid-Atlantic • PJM Interconnection • PEPCOERCOT, ISO-NE, NYISO and PJM—offered a range of economic and

Hopper, Nicole; Goldman, Charles; Bharvirkar, Ranjit; Engel, Dan

2007-01-01T23:59:59.000Z

198

The Role of Demand Response in Default Service Pricing  

E-Print Network (OSTI)

and Pennsylvania use the PJM real-time spot market price tosince the hourly real-time PJM prices are not known untilfive minutes. The hourly PJM price is a weighted average of

Barbose, Galen; Goldman, Chuck; Neenan, Bernie

2006-01-01T23:59:59.000Z

199

Killing Two Birds with One Stone: Can Real-Time Pricing Support Retail Competition and Demand Response?  

E-Print Network (OSTI)

other states are indexed to the PJM real-time energy market.Pricing New Jersey Maryland PJM region* NYISO region ISO-NEpenetration data for the PJM region as a whole in addition

Barbose, Galen; Bharvirkar, Ranjit; Goldman, Charles; Hopper, Nicole; Neenan, Bernie

2006-01-01T23:59:59.000Z

200

Configuring load as a resource for competitive electricity markets--Review of demand response programs in the U.S. and around the world  

E-Print Network (OSTI)

Contingency programs of NYISO, PJM, ISO-NE, and BG&E wereand more than $900/MWh in PJM’s region. All three programsEnergy Exchange Program, O1 PJM ISO Independent System

Heffner, Grayson C.

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

A Survey of Utility Experience with Real Time Pricing  

E-Print Network (OSTI)

operated by an ISO. NYISO and PJM are currently offeringMOC MW NMPC NYISO O&M PG&E PJM PSC PSO RTP SCE SCE&G T&D TVAGas & Electric Company PJM Interconnection, LLC public

Barbose, Galen; Goldman, Charles; Neenan, Bernie

2004-01-01T23:59:59.000Z

202

Addressing Energy Demand through Demand Response: International Experiences and Practices  

E-Print Network (OSTI)

New England 13 and the PJM Interconnection 14 . According toGW. The current size of the PJM system is approximately 165markets, most notably in the PJM Interconnection and ISO-New

Shen, Bo

2013-01-01T23:59:59.000Z

203

Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement  

E-Print Network (OSTI)

017F.PDF KEMA, Inc. 2011. PJM Empirical Analysis of DemandMethods. Prepared for the PJM Markets Implementation~/media/markets-ops/dsr/pjm-analysis-of-dr-baseline-methods-

Bode, Josh

2013-01-01T23:59:59.000Z

204

The Efficiency of Electricity Generation in the U.S. After Restructuring  

E-Print Network (OSTI)

New Jersey and Maryland (PJM), with 2001 peak demand ofpre-restructuring New England and PJM pools, are sometimesFor instance, plants in PJM are subject to the Environmental

Wolfram, Catherine

2003-01-01T23:59:59.000Z

205

Economic Consequences of Alternative Solution Methods for Centralized Unit Commitment in Day-Ahead Electricity Markets  

E-Print Network (OSTI)

have led several ISOs, such as PJM, to implement MIP-basedsolution found is optimal. PJM, for instance, allows its MIPbe employed. Nonetheless, PJM currently relies on B&B, and

Sioshansi, Ramteen; O'Neill, Richard; Oren, Shmuel S

2008-01-01T23:59:59.000Z

206

Real-time high-resolution X-ray imaging and nuclear magnetic resonance study of the hydration of pure and Na-doped C3A in the presence of sulfates  

E-Print Network (OSTI)

1992. 9. Mehta PK, Monteiro PJM. Concrete - Microstructure,Emwas c , J. L. Provis d and P.J.M. Monteiro e a Department16. Silva DA, Monteiro PJM. Early Formation of Ettringite in

Kirchheim,, A. P.

2012-01-01T23:59:59.000Z

207

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network (OSTI)

Operations, Brendan Kirby, ORNL/TM-2006-512, July. PJM 2005.Whitepaper on PJM Forward Energy Reserve: A Centralized CallManager, Retail Markets, PJM Interconnection LLC, January

Heffner, Grayson

2008-01-01T23:59:59.000Z

208

2008 WIND TECHNOLOGIES MARKET REPORT  

E-Print Network (OSTI)

the Midwest, Texas, Southwest, and PJM regions: wind in the52 GW), SPP (48 GW), and PJM (43 GW) account for over 70% ofThe queues surveyed include PJM Interconnection, Midwest

Bolinger, Mark

2010-01-01T23:59:59.000Z

209

Market Structure and Competition: A Cross-Market Analysis of U.S. Electricity Deregulation  

E-Print Network (OSTI)

Cournot Cournot n.v.a. PJM Actual Competitive CournotCournot Cournot n.v.a. PJM Actual Competitive CournotCournot Cournot n.v.a. PJM Actual Competitive Cournot

Bushnell, James; Mansur, Erin T.; Saravia, Celeste

2004-01-01T23:59:59.000Z

210

An Empirical Assessment of the Competitiveness of the New England Electricity Market  

E-Print Network (OSTI)

May - December 99 Cal PJM New England Density ResidualMay - December 1999) Cal NE PJM (p-MC)/p Residual Demand/Demand May - December 00 PJM NE Cal Density Residual Demand/

Bushnell, Jim; Saravia, Celeste

2002-01-01T23:59:59.000Z

211

Is Real-Time Pricing Green?: The Environmental Impacts of Electricity Demand Variance  

E-Print Network (OSTI)

Atlantic region, where the PJM wholesale electricity marketoperates. Firms in PJM use a mix of fuel sources andof the fossil fuel sources in PJM. The fossil-?red units are

Holland, Stephen P.; Mansur, Erin T.

2004-01-01T23:59:59.000Z

212

What China Can Learn from International Experiences in Developing a Demand Response Program  

E-Print Network (OSTI)

be able to be met). In PJM, the largest regional wholesalewhen called upon to do so. (e.g. PJM ELRP, IMO WA) Ancillarymarket energy price. (e.g. PJM SRM, UK STOR) Source: DOE (

Shen, Bo

2013-01-01T23:59:59.000Z

213

Electricity Merger Policy in the Shadow of Regulation  

E-Print Network (OSTI)

Pennsylvania-New Jersey-Maryland (PJM) electricity wholesalehour of the next day. The PJM also solicits real-time bidseffects of a merger in the PJM region should consider price

Gilbert, Richard J; Newberry, David M

2006-01-01T23:59:59.000Z

214

Coordination of Energy Efficiency and Demand Response  

E-Print Network (OSTI)

commitment. In May 2009, PJM announced results of itsin this auction, with PJM accepting 569 MW of efficiencyseparately to ISO-NE and PJM. The ISO/RTO program rules do

Goldman, Charles

2010-01-01T23:59:59.000Z

215

Variation and heritability of host susceptibility to the introduced pathogen Phytophthora ramorum in tanoak (Lithocarpus densiflorus, proposed name Notholithocarpus densiflorus) populations  

E-Print Network (OSTI)

xi Ivors KL, K Hayden, PJM Bonants, DM Rizzo, MGarbelotto.WA Man In’t Veld, AWAM De Cock, PJM Bonants, M De Weerdt, KIvors KL, Hayden K, Bonants PJM, Rizzo DM, Garbelotto M.

Hayden, Katherine J.

2010-01-01T23:59:59.000Z

216

REGULATION AND SYSTEM INTERDEPENDENCE: EFFECTS ON THE SITING OF CALIFORNIA ELECTRICAL ENERGY FACILITIES  

E-Print Network (OSTI)

calculated by a special PJM algorithm based on the MAJORYork State Power Pool (1966) 4. PJM Pennsylvania-New Jersey-familiar with NEPEX and PJM. Kaprielian Interview. Perry, p.

Kooser, J.C.

2013-01-01T23:59:59.000Z

217

Transacting generation attributes across market boundaries: Compatible information systems and the treatment of imports and exports  

E-Print Network (OSTI)

the Northeast include the PJM Interconnection, the New Yorkbasic market area (e.g. , the PJM, ISO-NE, or NYISO), this7 Stakeholders in New York, the PJM Power Pool, New England,

Grace, Robert; Wiser, Ryan

2002-01-01T23:59:59.000Z

218

Demand Response Valuation Frameworks Paper  

E-Print Network (OSTI)

12: Market Impacts of Price Responsive Load in PJM and ISO-44 Figure 15: PJM Synchronized Reserve Scheduled MW:particularly those in PJM’s service territory, have begun

Heffner, Grayson

2010-01-01T23:59:59.000Z

219

Switchable cell trapping using superparamagnetic beads  

E-Print Network (OSTI)

exchange constant, A = 13 pJm , saturation magnetization M sCMW, where A was increased to 39 pJm in the finely meshedregion (A = 390 pJm elsewhere). Lower A in CMW resulted in a

Bryan, M. T.

2010-01-01T23:59:59.000Z

220

Electricity Forward Prices: A High-Frequency Empirical Analysis  

E-Print Network (OSTI)

electricity prices reported by PJM. Prices are reported inNew Jersey, Maryland (PJM) electricity market for the periodusing the high-frequency PJM data set and documenting risk-

Longstaff, Francis; Wang, Ashley

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Application for Presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Cooperative) ITC (Response to AMP and Old Dominion) ITC (Intervention of PJM) ITC (Response to PJM) ITC (Response from PJM to Answer of ITC) ITC (PUC Ohio Comments...

222

Demand responsive programs - an emerging resource for competitive electricity markets?  

E-Print Network (OSTI)

References Bressler, Stu (PJM Interconnection, L.L.C. ).01, Effective Date: 06/01/00. PJM Interconnection, L.L.C. ,Market Monitoring Unit 2000. PJM Interconnection State of

Heffner, Dr. Grayson C.; Goldman, Charles A.

2001-01-01T23:59:59.000Z

223

When a Rose Is Not a Rose: A Review of Recent Estimates of Congestion Costs  

E-Print Network (OSTI)

Energy Regulatory Commission (FERC), Electric TransmissionConstraint Study (FERC, 2002). [13] U.S. Department ofReported by ISOs, DOE, and FERC Period PJM [1] PJM [1] PJM [

Lesieutre, Bernard C.; Eto, Joseph H.

2004-01-01T23:59:59.000Z

224

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

225

A Locational Analysis of Generation Benefits on Long Island, New York  

E-Print Network (OSTI)

LSE MMM MW MWh NYISO NYPE OASIS PJM RFP SCUC TTC AutomatedNew Jersey-Maryland (PJM) Interconnection in New Jersey and

Wang, Juan; Cohen, Jesse; Edwards, Jennifer; Marnay, Chris

2005-01-01T23:59:59.000Z

226

Today in Energy - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Source: U.S. Energy Information Administration, based on PJM data Note: Demand for the East Kentucky Power Cooperative, which joined PJM on June 1, 2013, ...

227

VANC-1 Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Customer) in North Carolina and Virginia to whom transmission is provided from the PJM Interconnection LLC (hereinafter called PJM) or Carolina Power & Light Company...

228

VA-3-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule...

229

The Potential of Plug-in Hybrid and Battery Electric Vehicles as Grid Resources: the Case of a Gas and Petroleum Oriented Elecricity Generation System  

E-Print Network (OSTI)

and Frequency Regulation in the PJM System. Research reportMedia/test-v2g-in- pjm-jan09.pdf. Accessed 13 June 2011.

Greer, Mark R

2012-01-01T23:59:59.000Z

230

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM...

231

Wealth Transfers from Implementing Real-Time Retail Electricity Pricing  

E-Print Network (OSTI)

market-monitor/downloads/mmu- reports/pjm-som-2004.pdf.Available at http://www.ucei.org. PJM Interconnection Market

Borenstein, Severin

2005-01-01T23:59:59.000Z

232

Power System Modeling of 20percent Wind-Generated Electricity by 2030  

E-Print Network (OSTI)

in New England and New York, 30% higher in PJM East, 20%higher in PJM West, 20% higher in California No wheeling

Hand, Maureen

2008-01-01T23:59:59.000Z

233

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Response of PJM...

234

VA-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule...

235

A Strong-Lens Survey in AEGIS: the influence of large scale structure  

E-Print Network (OSTI)

www.slac.stanford.edu/~pjm/HAGGLeS photometric zeropoints torespectively. The work of PJM was supported in part by the

2008-01-01T23:59:59.000Z

236

The Treatment of Renewable Energy Certificates, Emissions Allowances, and Green Power Programs in State Renewables Portfolio Standards  

E-Print Network (OSTI)

2008. See https://www.wirrc.com/rrc/index.html See http://Texas REC Program Wisconsin RRC PJM-EIS GATS PJM-EIS GATS (

Holt, Edward A.; Wiser, Ryan H.

2007-01-01T23:59:59.000Z

237

Coupling Renewable Energy Supply with Deferrable Demand  

E-Print Network (OSTI)

China, Europe (Denmark, Germany, Greece) and the United States (PJM, NYISO, CAISO, Ontario IMO) accept renewable

Papavasiliou, Anthony

2011-01-01T23:59:59.000Z

238

NICOM 4: 4th International Symposium on Nanotechnology in Construction Effect of Nanosilica on Cement Hydration under High Temperature and  

E-Print Network (OSTI)

; 1997. 14. Mehta K, Monterio PJM. Concrete: Microstructure, Properties and Materials, Third Edition. NY

Al-Majed, Abdulaziz Abdullah

239

Short run effects of a price on carbon dioxide emissions from U.S. electric generators  

Science Conference Proceedings (OSTI)

The price of delivered electricity will rise if generators have to pay for carbon dioxide emissions through an implicit or explicit mechanism. There are two main effects that a substantial price on CO{sub 2} emissions would have in the short run (before the generation fleet changes significantly). First, consumers would react to increased price by buying less, described by their price elasticity of demand. Second, a price on CO{sub 2} emissions would change the order in which existing generators are economically dispatched, depending on their carbon dioxide emissions and marginal fuel prices. Both the price increase and dispatch changes depend on the mix of generation technologies and fuels in the region available for dispatch, although the consumer response to higher prices is the dominant effect. We estimate that the instantaneous imposition of a price of $35 per metric ton on CO{sub 2} emissions would lead to a 10% reduction in CO{sub 2} emissions in PJM and MISO at a price elasticity of -0.1. Reductions in ERCOT would be about one-third as large. Thus, a price on CO{sub 2} emissions that has been shown in earlier work to stimulate investment in new generation technology also provides significant CO{sub 2} reductions before new technology is deployed at large scale. 39 refs., 4 figs., 2 tabs.

Adam Newcomer; Seth A. Blumsack; Jay Apt; Lester B. Lave; M. Granger Morgan [Carnegie Mellon University, Pittsburgh, PA (United States). Carnegie Mellon Electricity Industry Center

2008-05-01T23:59:59.000Z

240

RTO Briefing  

DOE Green Energy (OSTI)

OAK-B135 Transmission Updates The summary of this report is: (1) Small generators are not happy with FERC's Small Generator Interconnection NOPR, saying the proposed rule ignores much of the consensus developed between small generators and transmission owners during the ANOPR process. California wind generators seek clarification that repowering an existing facility or changing contract terms would not trigger a reevaluation of the interconnection. (2) The choices of former Alliance companies about which RTO to join, MISO or PJM, and whether they can obtain approval from states to do so, has created such a tangle that FERC held two days of hearings at the end of September on the issues and options for resolving them. But in addition to some constructive input, the hearings produced even more uncertainty, with transmission companies announcing their need to reassess their own RTO commitments depending on the decisions of others. (3) In the West, the Seams Steering Group--Western Interconnection (SSG-WI) completed a west-wide transmission study with a renewable energy scenario, the California ISO received FERC's approval on its market redesign proposal, and RTO West worked toward finalizing high-level consensus documents describing Day 1 implementation of the proposed RTO. (4) In Texas, ERCOT began $157 million in upgrades to the transmission system around McCamey--increasing capacity in and out of the area enough to handle existing wind projects there.

Steve Wiese

2003-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Central Electric Power Assn | Open Energy Information  

Open Energy Info (EERE)

Power Assn Jump to: navigation, search Name Central Electric Power Assn Place Mississippi Utility Id 2849 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity...

242

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

243

Solar Energy Research Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Solar Energy Research Center PROJECT DESCRIPTION SERC rendering The SERC building will be a 39,000 gsf building designed to house research laboratories and offices devoted to...

244

City of New Albany, Mississippi (Utility Company) | Open Energy...  

Open Energy Info (EERE)

Mississippi (Utility Company) Jump to: navigation, search Name City of New Albany Place Mississippi Utility Id 13412 Utility Location Yes Ownership M NERC Location SERC NERC SERC...

245

Big Rivers Electric Corp | Open Energy Information  

Open Energy Info (EERE)

Id 1692 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes References...

246

--FAILING THE FUTURE--PROBLEMS OF PERSISTENCE AND RETENTION IN SCIENCE,  

E-Print Network (OSTI)

Renewable Portfolio Obligation RPS Renewable Portfolio Standard SAP State Action Plan SERC State Electrcity

Castillo-Chavez, Carlos

247

Start Date End Date Building Time Reason 5/5/2011 5/5/2011 ENAD 5:30 am to 7:30 am Install current transformers  

E-Print Network (OSTI)

Renewable Portfolio Obligation RPS Renewable Portfolio Standard SAP State Action Plan SERC State Electrcity

Ginzel, Matthew

248

Weatherization and Intergovernmental Program: Sustainable Energy Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Sustainable Energy Resources for Consumers (SERC) Grants to someone by E-mail Share Weatherization and Intergovernmental Program: Sustainable Energy Resources for Consumers (SERC) Grants on Facebook Tweet about Weatherization and Intergovernmental Program: Sustainable Energy Resources for Consumers (SERC) Grants on Twitter Bookmark Weatherization and Intergovernmental Program: Sustainable Energy Resources for Consumers (SERC) Grants on Google Bookmark Weatherization and Intergovernmental Program: Sustainable Energy Resources for Consumers (SERC) Grants on Delicious Rank Weatherization and Intergovernmental Program: Sustainable Energy Resources for Consumers (SERC) Grants on Digg Find More places to share Weatherization and Intergovernmental Program: Sustainable Energy Resources for Consumers (SERC) Grants on

249

Slide 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

www.pjm.com www.pjm.com Congestion and the PJM Regional Transmission Expansion Plan H. Charles Liebold PJM Interconnection Manager, Interregional Planning December 6, 2011 DOE Workshop PJM©2011 2 21% of U.S. GDP produced in PJM PJM as Part of the Eastern Interconnection with ATSI & Duke Integration KEY STATISTICS PJM member companies 750+ millions of people served 61 peak load in megawatts 162,230 MWs of generating capacity 184,992 miles of transmission lines 62,214 GWh of annual energy 832,331 generation sources 1,340 square miles of territory 213,900 area served 13 states + DC Internal/external tie lines 247 * 26% of generation in Eastern Interconnection * 28% of load in Eastern Interconnection * 19% of transmission assets in Eastern Interconnection www.pjm.com PJM©2011

250

Social Welfare implications of demand response programs in competitiv e electricity markets  

E-Print Network (OSTI)

markets such as that run by the New York ISO and PJMInterconnection (PJM), and are also consistent with theDR programs of NYISO and PJM. An alternative is a program

Boisvert, Richard N.; Neenan, Bernard F.

2003-01-01T23:59:59.000Z

251

Application for Presidential Permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Letter filed Dec 8, 2011 in support of Settlement Agreement Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec...

252

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to intervene out of time and comments in support of the March 25, 2011 filing by PJM Interconnection, L.L.C. ("PJM") in the above-captioned proceeding. PETITION TO...

253

Electricity transmission congestion costs: A review of recent reports  

E-Print Network (OSTI)

Making Competition Work in Electricity. John Wiley and Sons.Report on the New York Electricity Markets. June. Patton,Market Report: New York Electricity Markets. April. PJM (PJM

Lesieutre, Bernard C.; Eto, Joseph H.

2003-01-01T23:59:59.000Z

254

Impact of Atmosphere–Ocean Coupling on the Predictability of Monsoon Intraseasonal Oscillations  

Science Conference Proceedings (OSTI)

The impact of air–sea coupling on the predictability of monsoon intraseasonal oscillations (MISO) has been investigated with an atmosphere–ocean coupled model and its atmospheric component. From a 15-yr coupled control run, 20 MISO events are ...

Xiouhua Fu; Bin Wang; Duane E. Waliser; Li Tao

2007-01-01T23:59:59.000Z

255

PJMDOCS-#501543-v1-DOE_Congestion_Workshop_9_17_08_-_MJK.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workshop on 2009 Congestion Study Workshop on 2009 Congestion Study September 17, 2008 Chicago, Illinois Statement of Michael J. Kormos Senior Vice President-Operations PJM Interconnection, L.L.C. PJM©2008 Page 2 of 5 PJM Interconnection, L.L.C. ("PJM") is pleased to provide these preliminary comments for consideration as the Department prepares to commence its next triennial congestion study. In 2005 and 2006, PJM submitted a great deal of information for the public record concerning the reliability

256

Ex Parte Communication, Docket EERE-2012-BT-STD-0022 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, Rheem and the Steffes...

257

Comparison of proton field-cycling relaxometry and molecular dynamics simulations for protonwater surface dynamics in cement-based materials  

E-Print Network (OSTI)

. / Cement and Concrete Research 37 (2007) 348­350 #12;Acknowledgements JPK and PJM thank the NANOCEM

Kalinichev, Andrey G.

258

Available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/watres  

E-Print Network (OSTI)

of Nitrosococcus mobilis. J Biotechnol Bioeng 99(5):1085­1095. Schmidt I, Steenbakkers PJM, op den Camp HJM

Nerenberg, Robert

259

The potential impact of renewable energy deployment on natural gas prices in New England  

E-Print Network (OSTI)

hub price (2002$/MMBtu) EERE: New England hub price (2002$/Northeast/PJM States (Bcf) EERE: Consumption all Northeast/

Wiser, Ryan; Bolinger, Mark

2004-01-01T23:59:59.000Z

260

Coordination of Retail Demand Response with Midwest ISO Markets  

E-Print Network (OSTI)

information also suggests that many LSEs provide "price-sensitive demand bids" in MISO day-ahead energy markets

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Energy Efficiency and Commercial-Mortgage Valuation  

E-Print Network (OSTI)

R 2 N = 1,390 Palo Verde Hub PJM Western South Path 15 NorthHub North Path 15 Palo Verde PJM Western South Path 15 ? e ?Dec/08 Into Entergy Mid?Col PJM West Sep/08 Jan/10 May/10

Jaffee, Dwight; Stanton, Richard; Wallace, Nancy

2012-01-01T23:59:59.000Z

262

Khesbn No. 18-19, October 1959 - Entire Journal  

E-Print Network (OSTI)

P X pta& a*p tan on px pjm paga p f r m •Pta& pngn opn opax*? 8 iga p a ayn taga 8 pjm Assi? 8 nga aran aaayn'o .anaa x px ftxamwr ywnxnya'* ? pjm oaxtaxa n s a n pa pyayanyam

1959-01-01T23:59:59.000Z

263

Solution of coupled acousticelastic wave propagation problems with anelastic attenuation using automatic hp-adaptivity  

E-Print Network (OSTI)

. California Po\\ver E\\change. and Pennsylvania-Jersey-Ma~ land (PJM) potter pool. The paper describes are reasonable' accurate. The efforts for the similar calcula[lons for the congcst]on rent for PJM electricity electricity markets. PJM were]! lacks transparent> in terms of dlsclosmg ]nformattoo pcr

Torres-Verdín, Carlos

264

Khesbn No. 22-23, September 1960 - Entire Journal  

E-Print Network (OSTI)

ni n y a i j n ^ ogn ,T>b pjm payVagia t r a "oy T O T J Py t ^ n " pa aag^teTya g pjm yr^'tt S^nyteoap /Sñax TIKn> •n"y fgaat^n a»n " ^ o » pjm aiynya v o t e l a nsn agn ,

1960-01-01T23:59:59.000Z

265

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Daily Volume MWh","Number of Trades","Number of Companies"  

U.S. Energy Information Administration (EIA) Indexed Site

6893,36894,36894,65.5,64.5,65,1600,2,2 6893,36894,36894,65.5,64.5,65,1600,2,2 "PJM West",36894,36895,36895,63,59.5,61.25,3200,4,2 "PJM West",36895,36896,36896,60,58.5,59.12,4800,6,4 "PJM West",36899,36900,36900,59.5,59.5,59.5,800,1,2 "PJM West",36900,36901,36901,58,55.5,56.61,5600,7,6 "PJM West",36901,36902,36902,50.5,49,49.75,3200,4,4 "PJM West",36902,36903,36903,47,46,46.33,4800,6,3 "PJM West",36903,36906,36906,45.5,45,45.12,3200,4,6 "PJM West",36906,36907,36907,46,42,44.21,5600,7,6 "PJM West",36907,36908,36908,42.5,42,42.4,4000,4,7 "PJM West",36908,36909,36909,41,39,39.56,7200,7,6 "PJM West",36909,36910,36910,39.5,39,39.25,2400,3,5 "PJM West",36910,36913,36913,51,50,50.43,5600,5,6

266

 

U.S. Energy Information Administration (EIA) Indexed Site

2 2 1 www.pjm.com Markets, Regulation and Energy Storage: A Match Made in Heaven? EIA 2013 Energy Conference June 17, 2013 Craig Glazer Vice President PJM Interconnection PJM©2012 2 www.pjm.com "We're Mad as Hell and We're Not Going to Take It Anymore!" PJM©2012 3 www.pjm.com * Need slide that is black. PJM©2012 4 www.pjm.com And What Were They Mad About??? At the Wholesale Level... * Transmission access - Negotiation of "wheeling rights" - Discriminatory treatment - Lengthy litigation: "Refunds to a Corpse" * Build-out costs * "Reliability" and "native load" as code

267

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Daily Volume MWh","Number of Trades","Number of Companies"  

U.S. Energy Information Administration (EIA) Indexed Site

623,37624,37624,37.45,33.75,35.69,28800,36,19 623,37624,37624,37.45,33.75,35.69,28800,36,19 "PJM West",37624,37627,37627,48,47,47.58,28800,32,20 "PJM West",37627,37628,37628,50.5,48,49.53,33600,42,19 "PJM West",37628,37629,37629,47,44.25,45.39,35200,44,20 "PJM West",37629,37630,37630,39,37,37.73,27200,33,19 "PJM West",37630,37631,37631,43.5,41.75,42.44,25600,27,17 "PJM West",37631,37634,37634,64,56.5,58.31,20800,26,19 "PJM West",37634,37635,37635,56,54.8,55.52,19200,24,19 "PJM West",37635,37636,37636,56.5,54.9,55.51,28000,33,19 "PJM West",37636,37637,37637,53,50.25,51.89,32000,40,22 "PJM West",37637,37638,37638,54,52,52.63,30400,38,23 "PJM West",37638,37641,37641,48.25,47,47.48,26400,33,17

268

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Daily Volume MWh","Number of Trades","Number of Companies"  

U.S. Energy Information Administration (EIA) Indexed Site

258,37259,37259,31,27.5,29.51,108000,101,28 258,37259,37259,31,27.5,29.51,108000,101,28 "PJM West",37259,37260,37260,28.25,26.95,27.38,107200,96,32 "PJM West",37260,37263,37263,26.7,26.25,26.45,102400,106,29 "PJM West",37263,37264,37264,26.25,25.45,25.75,87200,81,27 "PJM West",37264,37265,37265,24.85,24.2,24.45,53600,58,27 "PJM West",37265,37266,37266,23.6,22.5,23.05,88000,87,25 "PJM West",37266,37267,37267,23.05,22.75,22.91,72000,79,24 "PJM West",37267,37270,37270,25.1,24.55,24.88,75200,82,29 "PJM West",37270,37271,37271,23.65,22.6,23.44,47200,44,22 "PJM West",37271,37272,37272,23.05,22.85,22.95,42400,47,21 "PJM West",37272,37273,37273,23.6,23.1,23.33,68000,76,27 "PJM West",37273,37274,37274,23.8,23.3,23.47,72800,73,28

269

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Daily Volume MWh","Number of Trades","Number of Companies"  

U.S. Energy Information Administration (EIA) Indexed Site

988,37991,37991,43.25,36,38.11,35200,40,16 988,37991,37991,43.25,36,38.11,35200,40,16 "PJM West",37991,37992,37992,53.5,50,51.99,33600,41,24 "PJM West",37992,37993,37993,70,66.25,67.48,34400,40,25 "PJM West",37993,37994,37994,62,59.65,60.58,36000,41,19 "PJM West",37994,37995,37995,56.75,53,54.66,32800,39,23 "PJM West",37995,37998,37998,53.75,51.25,52.44,40000,47,25 "PJM West",37998,37999,37999,54,52.55,53.14,37600,47,24 "PJM West",37999,38000,38000,65.25,61.5,63.18,30400,37,20 "PJM West",38000,38001,38001,88,77,82.58,50400,57,28 "PJM West",38001,38002,38002,90,77,80.76,31200,37,20 "PJM West",38002,38005,38005,53.25,52.75,53.03,30400,38,18 "PJM West",38005,38006,38006,70,67,68.64,36000,45,24

270

Farmers' Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

6181 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1a1 LinkedIn...

271

West Central Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

0363 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1a1 LinkedIn...

272

Blue Ridge Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Id 1890 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1a1 LinkedIn...

273

Howard Electric Coop | Open Energy Information  

Open Energy Info (EERE)

8911 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1a1 LinkedIn...

274

Sho-Me Power Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Sho-Me Power Electric Coop Jump to: navigation, search Name Sho-Me Power Electric Coop Place Missouri Utility Id 17106 Utility Location Yes Ownership C NERC Location SERC NERC SERC...

275

Tri-County Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Tri-County Electric Coop, Inc Place South Carolina Utility Id 14175 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes Alt Fuel Vehicle Yes...

276

Central Electric Pwr Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Coop, Inc Jump to: navigation, search Name Central Electric Pwr Coop, Inc Place South Carolina Utility Id 40218 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes...

277

First Electric Coop Corp | Open Energy Information  

Open Energy Info (EERE)

First Electric Coop Corp Jump to: navigation, search Name First Electric Coop Corp Place Arkansas Utility Id 6342 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes...

278

www.eia.gov  

U.S. Energy Information Administration (EIA)

... SERC Reliability Corporation / Gateway Capacity, ... (PV). 5/ Includes biogenic ... 2012 are model results and may differ from official EIA data ...

279

www.eia.gov  

U.S. Energy Information Administration (EIA)

generation PV applications ... 2011 are model results and may differ slightly from official EIA data reports. 15 - SERC Reliability Corporation / ...

280

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Change","Daily Volume MWh","Number of Trades","Number of Counterparties"  

U.S. Energy Information Administration (EIA) Indexed Site

PJM-West Real Time Peak",41276,41277,41277,44,41.75,42.64,-6.4,60000,72,34 PJM-West Real Time Peak",41276,41277,41277,44,41.75,42.64,-6.4,60000,72,34 "PJM-West Real Time Peak",41277,41278,41278,37,36,36.53,-6.11,19200,23,23 "PJM-West Real Time Peak",41278,41281,41281,36.5,36,36.17,-0.36,41600,48,32 "PJM-West Real Time Peak",41281,41282,41282,33.05,32.5,32.61,-3.56,20800,26,18 "PJM-West Real Time Peak",41282,41283,41283,33.75,32.5,32.91,0.3,37600,43,30 "PJM-West Real Time Peak",41283,41284,41284,31,30.25,30.64,-2.27,26400,31,26 "PJM-West Real Time Peak",41284,41285,41285,29.9,29.25,29.66,-0.98,38400,26,23 "PJM-West Real Time Peak",41285,41288,41288,32.5,31.5,32.14,2.48,40000,50,28 "PJM-West Real Time Peak",41288,41289,41289,37.5,34.5,36.5,4.36,64800,74,35

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response of PJM Interconnection, L.L.C. Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company PP-230-4 Response of PJM Interconnection, L.L.C. to Answer of International

282

Presentation to the EAC - EMS Future Focus - Tom O'Brien  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 www.pjm.com 2 www.pjm.com Energy Management Systems (EMS) Future Focus DOE - Electric Advisory Committee Thomas F. O'Brien Vice President - Information Technology & Services October 15, 2012 PJM©2012 2 www.pjm.com Evolution Must Support Key Business Trends PJM©2012 3 www.pjm.com Extending the Integration Architecture * Industry standard messaging architecture * Shared Components for re-usable services * Security built directly into the architecture PJM©2012 4 www.pjm.com Breaking Down the Data Silos - Big Data Challenges PJM©2012 5 www.pjm.com SynchroPhasor Applications Voltage Stability Monitoring 1-2 years 2-5 years >5 years Disturbance Analysis Determination of Accurate Operating Limits Angle & Frequency Monitoring Real-time Control of wide-area network

283

Reactive and voltage monitoring: The challenge for the system operators in the 1980's  

Science Conference Proceedings (OSTI)

In order to gain perspective on the monitoring program for PJM, background relative to the physical characteristics and operating philosophy of the pool is offered. PJM is comprised of 11 electric utilities serving approximately 48,700 square miles, encompassing about 75% of Penna, 97% of N.J., all of Del and the District of Columbia, 60% of Md, and 1% of Va. The generating capability is comprised of 532 units at 116 generating stations, and totals approximately 45,000 MW. The PJM system peak load for 1980 was 34,420 MW. PJM has 27 tie lines with its neighboring systems. Although comprised of 11 utilities, the PJM system is operated as if it were a single company. Reasons for the PJM real-time monitoring system are presented and relevant details are discussed. Topics considered include operating criteria. Reactive and Voltage Monitoring, Current Operating Restrictions off-line analysis, and future requirements are discussed.

Willson, J.D.

1981-05-01T23:59:59.000Z

284

The Silver Bullet: Storage!  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Philly High X-prize PHEV The Silver Bullet... Storage! Terry Boston President & CEO PJM Interconnection July 12, 2011 PJM©2011 2 United States PJM Eastern Interconnection PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 700+ millions of people served 58 peak load in megawatts 158,448 MWs of generating capacity 180,400 miles of transmission lines 61,200 GWh of annual energy 794,335 generation sources 1,365 square miles of territory 211,000 area served 13 states + DC Internal/external tie lines 142 * 24% of generation in Eastern Interconnection * 27% of load in Eastern Interconnection * 19% of transmission assets in Eastern Interconnection 20% of U.S. GDP produced in PJM www.pjm.com As of 6/1/2011 PJM©2011 3 43,623 0 5,000 10,000 15,000

285

Why Reliability Options Are the Answer in New England  

Science Conference Proceedings (OSTI)

In its market's current failed state, PJM sees evidence that electricity markets do not work. But that's the wrong conclusion. Price signals do work and generators predictably respond to price signals whether they are good price signals or bad price signals. Bad price signals caused New England's and PJM's problems. Here is why good price signals based on the RO approach and competitive markets will now solve New England's problems - and why PJM's RPM is not the answer. (author)

Bidwell, Miles

2006-05-15T23:59:59.000Z

286

Economics of Transmission Planning: Methods, Examples, and Tools  

Science Conference Proceedings (OSTI)

This report describes an economic planning methodology that can be applied to regional and interregional transmission planning. It is modeled after long-distilled practices at the Midwest Independent System Operator (MISO) and a newer, proposed analysis for identifying the potential interregional developments of greatest mutual benefit to the energy trading regions. Existing and new examples of transmission planning exercises conducted by MISO facilitate the description. MISO background studies introduce...

2011-12-30T23:59:59.000Z

287

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Change","Daily Volume MWh","Number of Trades","Number of Counterparties"  

U.S. Energy Information Administration (EIA) Indexed Site

182,40183,40183,89,82.75,86.08,20.49,214400,242,55 182,40183,40183,89,82.75,86.08,20.49,214400,242,55 "PJM Wh Real Time Peak",40183,40184,40184,80.65,74.5,77.16,-8.92,270400,295,56 "PJM Wh Real Time Peak",40184,40185,40185,80.5,77.5,78.92,1.76,93600,111,47 "PJM Wh Real Time Peak",40185,40186,40186,86,78.25,80.64,1.72,278400,316,62 "PJM Wh Real Time Peak",40186,40189,40189,82.75,72,80.64,0,81600,98,36 "PJM Wh Real Time Peak",40189,40190,40190,73,65.75,67.86,-12.78,178400,205,50 "PJM Wh Real Time Peak",40190,40191,40191,55.25,53,53.89,-13.97,162400,180,50 "PJM Wh Real Time Peak",40191,40192,40192,49.75,48,48.84,-5.05,97600,109,45 "PJM Wh Real Time Peak",40192,40193,40193,46.25,43.5,44.65,-4.19,99200,117,46 "PJM Wh Real Time Peak",40193,40196,40196,46,44.95,45.38,0.73,59200,71,35

288

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Change","Daily Volume MWh","Number of Trades","Number of Counterparties"  

U.S. Energy Information Administration (EIA) Indexed Site

546,40547,40547,51,47.5,48.71,-0.32,96800,116,39 546,40547,40547,51,47.5,48.71,-0.32,96800,116,39 "PJM Wh Real Time Peak",40547,40548,40548,49.25,47.45,48.14,-0.57,64000,67,40 "PJM Wh Real Time Peak",40548,40549,40549,53.5,51.5,52.27,4.13,55200,66,37 "PJM Wh Real Time Peak",40549,40550,40550,60.5,57,58.43,6.16,80000,93,39 "PJM Wh Real Time Peak",40550,40553,40553,63.5,57,60.43,2,105600,124,41 "PJM Wh Real Time Peak",40553,40554,40554,69.5,64.25,66.98,6.55,128800,145,44 "PJM Wh Real Time Peak",40554,40555,40555,72.25,62,67.54,0.56,158400,194,51 "PJM Wh Real Time Peak",40555,40556,40556,84,75,80.13,12.59,92800,116,46 "PJM Wh Real Time Peak",40556,40557,40557,89.5,80.5,84.09,3.96,108800,133,42 "PJM Wh Real Time Peak",40557,40560,40560,57.55,55,56.11,-27.98,88800,105,40

289

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Change","Daily Volume MWh","Number of Trades","Number of Counterparties"  

U.S. Energy Information Administration (EIA) Indexed Site

355,38356,38356,41,39,40.13,6.73,12000,14,13 355,38356,38356,41,39,40.13,6.73,12000,14,13 "PJM Wh Real Time Peak",38356,38357,38357,41,40,40.57,0.44,13600,15,15 "PJM Wh Real Time Peak",38357,38358,38358,44,42,43.23,2.66,30400,35,16 "PJM Wh Real Time Peak",38358,38359,38359,46.25,44,45.07,1.84,17600,22,12 "PJM Wh Real Time Peak",38359,38362,38362,39.5,38.75,39.17,-5.9,9600,12,11 "PJM Wh Real Time Peak",38362,38363,38363,45,41.5,43.31,4.14,26400,32,17 "PJM Wh Real Time Peak",38363,38364,38364,44,41.25,41.8,-1.51,16000,19,15 "PJM Wh Real Time Peak",38364,38365,38365,39.5,38.5,39.1,-2.7,10400,13,13 "PJM Wh Real Time Peak",38365,38366,38366,51.5,47,48.26,9.16,57600,58,17 "PJM Wh Real Time Peak",38366,38369,38369,65,63,63.48,15.22,23200,21,14

290

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Change","Daily Volume MWh","Number of Trades","Number of Counterparties"  

U.S. Energy Information Administration (EIA) Indexed Site

720,38721,38721,69,68,68.6,1.54,74400,63,23 720,38721,38721,69,68,68.6,1.54,74400,63,23 "PJM Wh Real Time Peak",38721,38722,38722,74.25,69,70.77,2.17,68000,68,33 "PJM Wh Real Time Peak",38722,38723,38723,77.75,73.5,76.91,6.14,61600,70,35 "PJM Wh Real Time Peak",38723,38726,38726,74,69,70.06,-6.85,55200,57,22 "PJM Wh Real Time Peak",38726,38727,38727,63,61.75,62.52,-7.54,60800,72,29 "PJM Wh Real Time Peak",38727,38728,38728,55,51,53.51,-9.01,68800,55,30 "PJM Wh Real Time Peak",38728,38729,38729,50.5,49,49.37,-4.14,56000,55,25 "PJM Wh Real Time Peak",38729,38730,38730,50.6,49.5,50.17,0.8,54400,55,25 "PJM Wh Real Time Peak",38730,38733,38733,63.5,59,60.85,10.68,36800,37,23 "PJM Wh Real Time Peak",38733,38734,38734,65,64,64.63,3.78,12000,10,13

291

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Change","Daily Volume MWh","Number of Trades","Number of Counterparties"  

U.S. Energy Information Administration (EIA) Indexed Site

815,39818,39818,58.5,55.25,56.28,5.13,40000,45,27 815,39818,39818,58.5,55.25,56.28,5.13,40000,45,27 "PJM Wh Real Time Peak",39818,39819,39819,60.25,57.75,58.92,2.64,109600,119,41 "PJM Wh Real Time Peak",39819,39820,39820,58,55,56.66,-2.26,49600,60,29 "PJM Wh Real Time Peak",39820,39821,39821,55.55,55,55.21,-1.45,48000,56,34 "PJM Wh Real Time Peak",39821,39822,39822,63,60.75,61.9,6.69,38400,46,28 "PJM Wh Real Time Peak",39822,39825,39825,69,66,67.63,5.73,62400,74,37 "PJM Wh Real Time Peak",39825,39826,39826,66.5,61,64.03,-3.6,91200,107,40 "PJM Wh Real Time Peak",39826,39827,39827,85.5,80,82.91,18.88,103200,124,50 "PJM Wh Real Time Peak",39827,39828,39828,100,88,93.22,10.31,110400,135,51 "PJM Wh Real Time Peak",39828,39829,39829,110,93,98.58,5.36,77600,93,37

292

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Change","Daily Volume MWh","Number of Trades","Number of Counterparties"  

U.S. Energy Information Administration (EIA) Indexed Site

449,39450,39450,131,114,125.81,37.67,95200,116,49 449,39450,39450,131,114,125.81,37.67,95200,116,49 "PJM Wh Real Time Peak",39450,39451,39451,106,99,102.43,-23.38,78400,96,39 "PJM Wh Real Time Peak",39451,39454,39454,54,52.5,53.44,-48.99,65600,74,34 "PJM Wh Real Time Peak",39454,39455,39455,45,41,42.69,-10.75,87200,98,48 "PJM Wh Real Time Peak",39455,39456,39456,47.5,45,46.31,3.62,47200,57,36 "PJM Wh Real Time Peak",39456,39457,39457,59.5,54.25,57.53,11.22,35200,44,34 "PJM Wh Real Time Peak",39457,39458,39458,51,46.25,48.3,-9.23,72800,88,51 "PJM Wh Real Time Peak",39458,39461,39461,76.5,70,74.88,26.58,103200,121,42 "PJM Wh Real Time Peak",39461,39462,39462,80,75.5,77.94,3.06,109600,127,40 "PJM Wh Real Time Peak",39462,39463,39463,72,68,70.47,-7.47,78400,95,35

293

"Price Hub","Trade Date","Delivery Start Date","Delivery End Date","High Price $/MWh","Low Price $/MWh","Wtd Avg Price $/MWh","Change","Daily Volume MWh","Number of Trades","Number of Counterparties"  

U.S. Energy Information Administration (EIA) Indexed Site

911,40912,40912,56,52,53.84,-11.87,161600,191,55 911,40912,40912,56,52,53.84,-11.87,161600,191,55 "PJM Wh Real Time Peak",40912,40913,40913,39,38,38.7,-15.14,45600,54,30 "PJM Wh Real Time Peak",40913,40914,40914,33.25,33,33.05,-5.65,42400,53,33 "PJM Wh Real Time Peak",40914,40917,40917,37.25,36.5,36.8,3.75,43200,51,34 "PJM Wh Real Time Peak",40917,40918,40918,36,35.25,35.53,-1.27,48000,57,31 "PJM Wh Real Time Peak",40918,40919,40919,35,34.2,34.6,-0.93,32000,40,28 "PJM Wh Real Time Peak",40919,40920,40920,35.5,35,35.14,0.54,43200,48,27 "PJM Wh Real Time Peak",40920,40921,40921,40.75,38.6,39.44,4.3,108000,111,39 "PJM Wh Real Time Peak",40921,40924,40924,43.5,41.6,42.69,3.25,61600,74,39 "PJM Wh Real Time Peak",40924,40925,40925,35.25,34.5,34.68,-8.01,36000,44,23

294

Circleville, West Virginia 26804  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

does not actually hamper development of these projects. PJM's Regional Transmission Expansion Plan ("RTEP") has prompted the development of several transmission projects in...

295

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

296

City of Alexandria's Application for Rehearing | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Pepco and PJM Interconnection...

297

Journal of Crystal Growth 250 (2003) 499515 Induction time in crystallization of gas hydrates  

E-Print Network (OSTI)

-mail addresses: pawel@ices.utexas.edu, pjm@agh.edu.pl (P.J. Matuszyk). Comput. Methods Appl. Mech. Engrg. 213

Firoozabadi, Abbas

298

Allegheny Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Utility Id 332 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

299

Project Award Spreadsheets 2010 12 21 1232.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Organization Recovery Act Funding PJM Interconnection, LLC 16,000,000 The National Association of Regulatory Utility Commissioners (NARUC) 14,000,000 Western...

300

Village of Plymouth, Ohio (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Utility Id 15203 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form...

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Application for presidential permit OE Docket No. PP-230-4 International Transmission...

302

ESSAYS IN FINANCIAL TRANSMISSION RIGHTS PRICING.  

E-Print Network (OSTI)

??This work examines issues in the pricing of financial transmission rights in the PJM market region. The US federal government is advocating the creation of… (more)

Posner, Barry

2006-01-01T23:59:59.000Z

303

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

uters-used-unclassified-controlled-information-lawrence-livermore-0 Download Response by PJM to letters from the City of Alexandria and the Virginia Department of Environmental...

304

Primal-dual methods for solving infinite-dimensional games  

E-Print Network (OSTI)

(1958), 171-176. http://projecteuclid.org/euclid.pjm/1103040253. [4] Nesterov, Yurii. Primal-dual subgradient methods for convex problems. In: Mathematical.

305

Application for Presidential Permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec 8, 2011 in support of Settlement Agreement Application for...

306

Reconstrução fonológica e lexical do Proto-Jê meridional.  

E-Print Network (OSTI)

??Esta dissertação busca reconstruir a fonologia e o léxico do Proto-Jê meridional (PJM). O Jê meridional é um dos três ramos da família jê e… (more)

Marcelo Pinho De Valhery Jolkesky;

2010-01-01T23:59:59.000Z

307

City of Vineland, New Jersey (Utility Company) | Open Energy...  

Open Energy Info (EERE)

Utility Id 19856 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

308

Mirant: Summary of Monitored SO2 Concentrations During Periods...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact More Documents & Publications Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department...

309

Ex Parte Communication, Docket EERE-2012-BT-STD-0022  

Energy.gov (U.S. Department of Energy (DOE))

On November 16, 2012, representatives from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, Rheem and the...

310

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

311

Today in Energy - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Search EIA.gov. A-Z Index; ... PJM shows how smart appliances could help stabilize power systems. May 12, 2011 Spot price for Central Appalachian coal ...

312

Transmission upgrades compensate for coal-fired retirements in ...  

U.S. Energy Information Administration (EIA)

Biofuels: Ethanol & Biodiesel ... improve the flow of power between regions. PJM has an overall reserve margin of 29%, 13 percentage points above its target, ...

313

Energy Crossroads: Utility Industry | Environmental Energy Technologie...  

NLE Websites -- All DOE Office Websites (Extended Search)

in 13 states and the District of Columbia. PJM operates an efficient, effective wholesale electricity market, and manages a long-term regional electric transmission planning...

314

Fe  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Group AUTHOR: Dan Delurey-Association for Demand Response and Smart Grid National Forum of the National Action Plan on Demand Response Case Study Interview: PJM...

315

Capacity Markets for Electricity  

E-Print Network (OSTI)

the prevailing PJM energy market price. The demand in thethe prevailing national energy market price. Last, suppliersraising the national energy market price cap P up to f, in

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

316

What China Can Learn from International Experiences in Developing a Demand Response Program  

E-Print Network (OSTI)

may be paid the spot market energy price. (e.g. PJM SRM, UKor the wholesale market price for energy. By codifying the

Shen, Bo

2013-01-01T23:59:59.000Z

317

Real Time Pricing as a Default or Optional Service for C&I Customers: A Comparative Analysis of Eight Case Studies  

E-Print Network (OSTI)

rates only for the PJM region as a whole, and not for NJ andrates. 57 % of Eligible Customers % of Eligible Load NJ MD

Barbose, Galen; Goldman, Charles; Bharvirkar, Ranjit; Hopper, Nicole; Ting, Michael; Neenan, Bernie

2005-01-01T23:59:59.000Z

318

Allegheny Energy Supply Co LLC | Open Energy Information  

Open Energy Info (EERE)

Energy Supply Co LLC Place Pennsylvania Utility Id 23279 Utility Location Yes Ownership R NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity...

319

Today in Energy - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Mexico Week: U.S.-Mexico electricity trade is small, with tight regional focus. ... PJM shows how smart appliances could help stabilize power systems. May 12, 2011

320

Today in Energy - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Solar activity can affect transmission grid, but 2013 activity less than anticipated. ... PJM shows how smart appliances could help stabilize power systems. May 12, 2011

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

smart grid - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

... prices, employ- ment and productivity, distribution, stocks ... smart grid November 1, 2012 ... PJM shows how smart appliances could help stabilize power systems. ...

322

CERTS 2012 Program Review - Automatic Reliability Reports (ARR...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

prototype at MISO: Architecture, Grid Monitoring Visualization and Grid Reliability Tracking Grid Automatic Reliability Report (GARR) Page 1 Automatic Reliability Reports (ARR)...

323

PRE-STUDY COMMENTS OF IOWA UTILITIES BOARD ON DOE 2012 ELECTRIC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MISO Top Congested Flowgate Studies as well as the upcoming flowgate study. EISPC During 2012, EISPC, along with the Argonne National Laboratory, Oak Ridge National Laboratory,...

324

Creating Collaboration: Community Participation Model  

Wind Powering America (EERE)

protecting 34,700 acres of Family Farms for future generations only 300 acres out of production * MISO Interconnection completed providing 99.9999999% power quality Unanimous...

325

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

American Transmission Systems Inc Place Ohio Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes References EIA...

326

Coordination of Retail Demand Response with Midwest ISO Markets  

E-Print Network (OSTI)

Robinson, Michael, 2008, "Demand Response in Midwest ISOPresentation at MISO Demand Response Working Group Meeting,Coordination of Retail Demand Response with Midwest ISO

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

327

Grafton Electric | Open Energy Information  

Open Energy Info (EERE)

Grafton Electric Jump to: navigation, search Name Grafton Electric Place Iowa Utility Id 7442 Utility Location Yes Ownership M NERC Location MRO ISO MISO Yes Activity Retail...

328

Regions for Select Spot Prices  

Gasoline and Diesel Fuel Update (EIA)

Citygate Illinois Hub (MISO) Louisiana Henry Hub Entergy (SNL index) Houston Houston Ship Channel Houston Zone (SNL index) Southwest El Paso San Juan Palo Verde (SNL index)...

329

The Potential Impacts of a Competitive Wholesale Market in the...  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent System Operator (MISO) will begin operating the first ever, formal wholesale market for electricity in the central and upper Midwestern portion of the United States....

330

Today in Energy - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

The Midcontinent Independent System Operator (MISO) plans to integrate the operations of the transmission systems owned by four electric companies in the ...

331

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

Transmission Company Jump to: navigation, search Name Michigan Electric Transmission Company Place Michigan Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO...

332

Today in Energy - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

The addition of these four electric systems to MISO will ... as the nuclear industry absorbed the lessons ... fuel economy statistics for new light-duty vehicles.

333

Canonical Representations sp (2n, R)  

E-Print Network (OSTI)

leaves p(m) invariant. Let {pJm)} be a basis for the set p(and the completeness of the set {pJm)}, we get the followingp~m)(z) = N(m) L: d(m)(J2)~ pJm)(z) a = 1,2, . .. ,N(m). (J=

Rangarajan, G.

2011-01-01T23:59:59.000Z

334

"Price Hub","Trade Date","Delivery Start Date","Delivery End...  

U.S. Energy Information Administration (EIA) Indexed Site

084,39085,39085,39.75,37,38.52,-2.01,20000,25,23 "PJM Wh Real Time Peak",39085,39086,39086,39,37.5,38.37,-0.15,13600,17,20 "PJM Wh Real Time Peak",39086,39087,39087,34.25,33,33.48,...

335

Microsoft PowerPoint - Herling.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 1 Congestion and the PJM Regional Transmission Plan Steven R. Herling Vice President, Planning PJM Interconnection March 25, 2009 PJM©2009 2 PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 500+ millions of people served 51 peak load in megawatts 144,644 MWs of generating capacity 164,905 miles of transmission lines 56,250 GWh of annual energy 729,000 generation sources 1,271 square miles of territory 164,260 area served 13 states + DC Internal/external tie lines 250 26% of generation in Eastern Interconnection 23% of load in Eastern Interconnection 19% of transmission assets in Eastern Interconnection 19% of U.S. GDP produced in PJM 6,038 substations PJM©2009 3 ©2009 www.monitoringanalytics.com Top 25 constraints with frequent occurrence:

336

Table 1. 2010 Summary Statistics  

U.S. Energy Information Administration (EIA) Indexed Site

Carolina" "NERC Region(s)",,"SERC" "Primary Energy Source",,"Nuclear" "Net Summer Capacity (megawatts)",23982,17 " Electric Utilities",22172,9 " Independent Power Producers &...

337

VISUALS: 3-D Animation of Dislocation Glide  

Science Conference Proceedings (OSTI)

Feb 12, 2007 ... Animation of edge-screw dislocation glide. Citation: van der Pluijm, Ben. "3-D Animation of Dislocation Glide." Teach the Earth: The SERC ...

338

City of Carlyle, Illinois (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Yes Ownership M NERC Location RFC NERC SERC Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for...

339

Illinois Power Co | Open Energy Information  

Open Energy Info (EERE)

Ownership I NERC Location RFC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes References EIA Form...

340

www.eia.gov  

U.S. Energy Information Administration (EIA)

generation PV applications (i.e., ... 2011 are model results and may differ slightly from official EIA ... SERC Reliability Corporation / Delta REG012 ...

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

www.eia.gov  

U.S. Energy Information Administration (EIA)

... (PV). 5/ Includes biogenic ... 2012 are model results and may differ from official EIA data reports. 15 - SERC Reliability Corporation / Central ...

342

www.eia.gov  

U.S. Energy Information Administration (EIA)

... SERC Reliability Corporation / Virginia-Carolina ... (PV). 5/ Includes biogenic ... 2012 are model results and may differ from official EIA data ...

343

www.eia.gov  

U.S. Energy Information Administration (EIA)

4/ Does not include off-grid photovoltaics (PV). ... 16 - SERC Reliability Corporation / Virginia-Carolina REG016 REG016:ca_ConventionalH ...

344

 

U.S. Energy Information Administration (EIA) Indexed Site

1 1 www.pjm.com 2011 EIA Energy Conference Intelligent Electric Systems Andy Ott Senior Vice President - Markets April 26, 2011 PJM©2011 2 Smart Grid www.pjm.com Transmission Distribution Energy Users Network Operations Energy Providers Consumer Devices PJM©2011 3 Network Operations Generation and Demand Resource Control www.pjm.com PJM©2011 4 Future SynchroPhasor Applications * Use recorded data * Verification of operations * Analyze dynamic performance * System model maintenance * Situational awareness display & alerts * Visual status displays * Interface into EMS * Limit alarms * State measurement * Visual displays and Alarm Processing * Dynamic operation limits (oscillations, mode shapes...) * Parameter estimation * Oscillation detection * Fault location Control Actions For:

345

Analysis of the Clean Energy Standard Act of 2012  

Gasoline and Diesel Fuel Update (EIA)

4 4 Appendix C: Map of NEMS Electricity Market Module Regions 1 Texas Regional Entity (ERCT) 12 SERC / Delta (SRDA) 2 Florida Reliability Coordinating Council (FRCC) 13 SERC / Gateway (SRGW) 3 Midwest Reliability Organization / East (MROE) 14 SERC / Southeastern (SRSE) 4 Midwest Reliability Organization / West (MROW) 15 SERC / Central (SRCE) 5 NPCC / Northeast (NEWE) 16 SERC / Virginia-Carolina (SRVC) 6 NPCC / NYC-Westchester (NYCW) 17 Southwest Power Pool / North (SPNO) 7 NPCC / Long Island (NYLI) 18 Southwest Power Pool / South (SPSO) 8 NPCC / Upstate New York (NYUP) 19 WECC / Southwest (AZNM) 9 Reliability First Corporation / East (RFCE) 20 WECC / California (CAMX) 10 Reliability First Corporation / Michigan (RFCM) 21 WECC / Northwest Power Pool Area (NWPP)

346

U.S. Energy Information Administration | Annual Energy Outlook 2011  

Gasoline and Diesel Fuel Update (EIA)

229 229 U.S. Energy Information Administration | Annual Energy Outlook 2011 Regional maps Figure F2. Electricity market module regions Source: U.S. Energy Information Administration, Office of Energy Analysis. 12 11 10 19 22 21 20 15 14 9 13 7 5 6 1 2 3 4 16 17 8 18 1. ERCT ERCOT All 2. FRCC FRCC All 3. MROE MRO East 4. MROW MRO West 5. NEWE NPCC New England 6. NYCW NPCC NYC/Westchester 7. NYLI NPCC Long Island 8. NYUP NPCC Upstate NY 9. RFCE RFC East 10. RFCM RFC Michigan 11. RFCW RFC West 12. SRDA SERC Delta 13. SRGW SERC Gateway 14. SRSE SERC Southeastern 15. SRCE SERC Central 16. SRVC SERC VACAR 17. SPNO SPP North 18. SPSO SPP South 19. AZNM WECC Southwest 20. CAMX WECC California 21. NWPP WECC Northwest 22. RMPA WECC Rockies U.S. Energy Information Administration | Annual Energy Outlook 2011

347

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from PJM Interconnection LLC from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM Interconnection LLC Response from International Transmission Company to late motion to intervene from PJM Interconnection in the matter of the application for a presidential permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP 230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International

348

Adams Rural Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1a1 LinkedIn...

349

Electricity demand patterns matter for valuing electricity supply ...  

U.S. Energy Information Administration (EIA)

PJM's hourly real-time energy prices corresponding to the week of hourly demand values are shown below. Prices also vary by hour and are much more volatile than demand.

350

Microsoft Word - Document1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4:00 AM with a scheduled return date of Saturday, June 9, 2007 at 2:00 PM. This planned transmission outage is contingent on the availability of Mirant generation. PJM will be...

351

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOA-0000068 PJM OE DE-FOA-0000068 EDTD 2010 Alicia R. Dalton-Tingler Award date until 29Jan12 955 Jefferson Ave. Morristown, PA 19403 Eastern Interconnection Planning Collaborative...

352

PP-230-2 International Transmission Company | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. PP-230-4 International Transmission Company: Federal Register Notice Volume 74, No. 26 - Feb. 10, 2009 Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C....

353

Warren Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Utility Id 40223 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 -...

354

JEM Table of Contents: September 1996 - TMS  

Science Conference Proceedings (OSTI)

P.J.M. Parmiter and J.G. Swanson. Growth, Characterization and Modeling of Inx Ga1-xP Stripes by Selective-Area MOCVD [pp. 1514-1520] J.F. Kluender, A.M. ...

355

The Benefits of Restructuring: It's Not Your Grandfather's Electric Utility Anymore  

Science Conference Proceedings (OSTI)

The key to achieving and maintaining most of the benefits from the emerging competitive market for electricity supply is to have a workably competitive wholesale generation market. By any objective measure, the PJM regional transmission organization is fulfilling its mission.

Switzer, Sheldon; Straub, Mary M.

2006-02-01T23:59:59.000Z

356

--No Title--  

U.S. Energy Information Administration (EIA) Indexed Site

October 03, 2013
  Next Release Date: October 17, 2013
  PJM West data for 2005-2012 Re-released

<...

357

Village of Sycamore, Ohio (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Utility Id 18393 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 -...

358

FINAL REPORT - HYBRID-MIXING TESTS SUPPORTING THE CONCENTRATE RECEIPT VESSEL (CRV-VSL-00002A/2B) CONFIGURATION  

Science Conference Proceedings (OSTI)

The Savannah River National Laboratory (SRNL) has performed scaled physical modeling of Pulse Jet Mixing Systems applicable to the Concentrate Receipt Vessel (CRV) of Hanford's Waste Treatment Plant (WTP) as part of the overall effort to validate pulse jet mixer (PJM) mixing in WTP vessels containing non-Newtonian fluids. The strategy developed by the Pulse Jet Mixing Task Team was to construct a quarter-scale model of the CRV, use a clear simulant to understand PJM mixing behavior, and down-select from a number of PJM configurations to a ''best design'' configuration. This ''best design'' would undergo final validation testing using a particulate simulant that has rheological properties closely similar to WTP waste streams. The scaled PJM mixing tests were to provide information on the operating parameters critical for the uniform movement (total mobilization) of these non-Newtonian slurries. Overall, 107 tests were performed during Phase I and Phase II testing.

GUERRERO, HECTORN.

2004-09-01T23:59:59.000Z

359

Investment and Bidding Strategies in Markets for Firm Transmission Rights  

Science Conference Proceedings (OSTI)

The first part of this paper addresses the applicability of the Markowitz portfolio theory to investing in Contracts for Firm Transmission Right (CFTRs) or Transmission Congestion Contracts (TCCs) typical for electricity markets in Northeastern US (PJM, ...

Aleksandr Rudkevich

2004-01-01T23:59:59.000Z

360

The Energy Coop | Open Energy Information  

Open Energy Info (EERE)

Utility Id 49746 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010...

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Borough of Goldsboro, Pennsylvania (Utility Company) | Open Energy...  

Open Energy Info (EERE)

Utility Id 7359 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 -...

362

Ex Parte Communication, Docket EERE-2012-BT-STD-0022  

Energy.gov (U.S. Department of Energy (DOE))

On May 2, representatives from PJM Interconnection, L.L.C., the National Rural Electric Cooperatives Association, the Edison Electric Institute and the American Public Power Association held a...

363

Ex Parte Communication, Docket EERE-2012-BT-STD-0022  

Energy.gov (U.S. Department of Energy (DOE))

On April 19, 2013, representatives from PJM Interconnection LLC and the National Rural Electric Cooperatives Association held a phone call with members of the Department of Energy’s General Counsel...

364

Capacity Markets for Electricity  

E-Print Network (OSTI)

Global Agenda, August 15. [6] FERC, Docket No. EL01-63-003,at http://www.pjm.com. [7] FERC, Docket No. ER01-1440-capacity of the others” (FERC, 2001). Therefore, if an LSE

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

365

Capacity Markets for Electricity  

E-Print Network (OSTI)

incentives to respond to real-time prices. This implies thatve minutes and providing real-time price of See Joskow andthe highest prices in the PJM real-time spot market occurred

Creti, Anna; Fabra, Natalia

2004-01-01T23:59:59.000Z

366

The Role of Demand Response in Default Service Pricing  

E-Print Network (OSTI)

LBNL-57661: August 2005. Real-time prices are set every fiveThe hourly PJM real time market price is a weighted averageto estimate real time market prices. New Jersey utilities

Barbose, Galen; Goldman, Charles; Neenan, Bernie

2008-01-01T23:59:59.000Z

367

The Role of Demand Response in Default Service Pricing  

E-Print Network (OSTI)

infrastructure has also a Real-time prices are set everysince the hourly real-time PJM prices are not known untilCommodity Charge Real-time market price Applicable Customer

Barbose, Galen; Goldman, Chuck; Neenan, Bernie

2006-01-01T23:59:59.000Z

368

Killing Two Birds with One Stone: Can Real-Time Pricing Support Retail Competition and Demand Response?  

E-Print Network (OSTI)

ahead energy market, for which hourly prices are published aPJM real-time energy market. Hourly prices in this marketenergy market provide customers with a more compelling incentive for price

Barbose, Galen; Bharvirkar, Ranjit; Goldman, Charles; Hopper, Nicole; Neenan, Bernie

2006-01-01T23:59:59.000Z

369

Addressing Energy Demand through Demand Response: International Experiences and Practices  

E-Print Network (OSTI)

is determined by the market energy price offered by themay be paid the spot market energy price. (e.g. PJM SRM, UKor the wholesale market price for energy. By codifying the

Shen, Bo

2013-01-01T23:59:59.000Z

370

Demand Response in U.S. Electricity Markets: Empirical Evidence  

E-Print Network (OSTI)

in the ISO-NE’s Day-Ahead energy market. 4 PJM provides itsin the Real-Time energy market, either through direct orahead and real-time energy market with centralized economic

Cappers, Peter

2009-01-01T23:59:59.000Z

371

The Silver Bullet: Storage!  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compressor operates at low load periods; gas turbine serves load as needed - Smoothes out loadsupply profile with quick response * PJM is working with FirstEnergy on Norton CAES...

372

New Enterprise R E C, Inc | Open Energy Information  

Open Energy Info (EERE)

New Enterprise R E C, Inc Place Pennsylvania Utility Id 13205 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes References EIA...

373

South Jersey Energy Company | Open Energy Information  

Open Energy Info (EERE)

Jersey Utility Id 17549 Utility Location Yes Ownership R NERC Location RFC NERC RFC Yes RTO PJM Yes ISO NE Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data...

374

Washington Gas Energy Services | Open Energy Information  

Open Energy Info (EERE)

Virginia Utility Id 20659 Utility Location Yes Ownership R NERC RFC Yes RTO PJM Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1a1...

375

Hudson Energy Services | Open Energy Information  

Open Energy Info (EERE)

Energy Services Place New York Utility Id 55878 Utility Location Yes Ownership R RTO PJM Yes ISO NY Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File...

376

To be more explicit on number 4) below, she wants to try to get...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

only the number of units necessary to meet PJM's directive and optimizing its use of Trona injection to minimize SO 2 emissions. In a June 2, 2006, letter order to Mirant, DOE...

377

Microsoft Word - July Heat 7-18 v3  

Annual Energy Outlook 2012 (EIA)

at reduced capacity today. System alerts: New York's grid operator called on emergency demand response for a second day in a row. ISO-New England and PJM continued appeals...

378

unknown title  

E-Print Network (OSTI)

PPL Electric is a public utility company organized under the laws of the Commonwealth of Pennsylvania. It is a wholly owned subsidiary of PPL Corporation. PPL Electric owns transmission and distribution facilities located within PJM and currently serves approximately 1.4 million customers in 29 counties in eastern and central Pennsylvania. PPL Electric’s transmission system consists of approximately 5,000 miles of transmission lines and covers a service territory of approximately 10,000 square miles. PPL Electric is also the default supplier for retail customers within its service territory under Pennsylvania’s Electricity Generation Customer Choice and Competition Act, 66 Pa.C.S. § 2801, et seq. PPL Electric and its predecessors have been members of the PJM Regional Transmission Organization and its predecessor organizations since 1927. As such, PJM directs the operation of PPL Electric’s transmission facilities pursuant to the PJM Consolidated Transmission Owners Agreement. PJM provides transmission service over PPL Electric’s transmission facilities to customers under the PJM Tariff. PJM is divided into several different transmission zones and the annual transmission revenue requirement (“ATRR”) for each transmission zone is reflected in Attachment H of the PJM Tariff. The ATRR for each zone is used to establish rates for network and point-to-point transmission service within each zone and Transmission Enhancement Charges (“TECs”) pursuant to Schedules 12 and 12–Appendix of the PJM Tariff. PPL Electric currently recovers its transmission cost of service through a stated rate that is set forth in Schedules 7 and 8 and Attachment H-8 of the PJM Tariff, which establish, respectively, the point-to-point transmission rates for delivery to the PPL Group Zone 2 and the Network Integration Transmission Service (“NITS”) rates in the PPL Group Zone. PPL Electric shares the PPL Group Zone with UGI Utilities, Inc. (“UGI”), which recovers its ATRR through a formula rate, and Allegheny Electric Cooperative (“AEC”), which recovers its ATRR through a stated rate. 3 The rate for point-to-point service delivered to the PPL Group Zone or NITS within that zone is the sum of the individual rates for PPL Electric, UGI, and AEC. 4 PPL is not currently recovering TECs pursuant to Schedule 12 of the PJM Tariff.

Ms. Kimberly D. Bose; I. Background

2008-01-01T23:59:59.000Z

379

Application for Presidential Permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential Permit OE Docket No. PP-230-4 Presidential Permit OE Docket No. PP-230-4 International Transmission Co: Answer to NYISO from MISO and IESO Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Co: Answer to NYISO from MISO and IESO The Midwest Independent Transmission System Operator (MISO) and the Independent Electricity System Operator (IESO) submit joint comments in response to the intervene and request for comment by New York Independent System Operator (NYISO) regarding application from ITC to construct, operate and maintain electric transmission facilities at the U.S - Canada Border. Answer to NISO from MISO and IESO 10-13-11.pdf More Documents & Publications Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments and Supplemental Documents

380

Rural Electric Conven Coop | Open Energy Information  

Open Energy Info (EERE)

Conven Coop Jump to: navigation, search Name Rural Electric Conven Coop Place Illinois Utility Id 16420 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes ISO MISO Yes...

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Observations of a Storm Containing Misocyclones, Downbursts, and Horizontal Vortex Circulations  

Science Conference Proceedings (OSTI)

On 30 June 1982, a multicellular storm in Colorado produced four downbursts, three misocyclones, a miso-anticyclone, and horizontal vortex circulations within a relatively small area of the storm. Weather events associated with this storm ...

Cathy J. Kessinger; David B. Parsons; James W. Wilson

1988-10-01T23:59:59.000Z

382

Microsoft Word - DOE St.Louis Workshop 12-8-11 Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MISO and SPP energy markets are based on 18 nodal prices that reflect congestion through price 19 differences at the various locations for generations 20 and loads. The third...

383

Coordination of Retail Demand Response with Midwest ISO Markets  

E-Print Network (OSTI)

MISO Day- ahead and Real-time Price-sensitive demand: LSEse.g. high day-ahead or real-time market prices) and systemis required to pay the real-time market price for load not

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

384

Role of Interactions between Aerosol Radiative Effect, Dynamics, and Cloud Microphysics on Transitions of Monsoon Intraseasonal Oscillations  

Science Conference Proceedings (OSTI)

Extended-range prediction of monsoon intraseasonal oscillations (MISOs), crucial for agriculture and water management, is limited by their event-to-event variability. Here, the authors propose a hypothesis supported by a number of model ...

Anupam Hazra; B. N. Goswami; Jen-Ping Chen

2013-07-01T23:59:59.000Z

385

What's New - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

A B C D E F G H I J K L M N O P Q R S T U V W XYZ. What's New. Older than 30 days MISO adding four new electric territories in December. Oct 24, ...

386

Michigan Public Power Agency | Open Energy Information  

Open Energy Info (EERE)

Agency Jump to: navigation, search Name Michigan Public Power Agency Place Michigan Utility Id 40582 Utility Location Yes Ownership S NERC Location RFC NERC RFC Yes ISO MISO Yes...

387

PJMDOCS-#713853-v3-Ex_Parte_Communication_-_DOE_Water_Heater_Meeting.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 3, 2013 Craig Glazer V.P., Federal Government Policy glazec@pjm.com (202) 423-4743 VIA EMAIL U.S. Department of Energy Email: expartecommunications@hq.doe.gov RE: Ex Parte Communication, Docket EERE-2012-BT-STD-0022 To whom it may concern; On May 2, representatives from PJM Interconnection, L.L.C., the National Rural Electric Cooperatives Association, the Edison Electric Institute and the American Public Power

388

The Arguments For and Against Ownership Unbundling of Energy Transmission Networks  

E-Print Network (OSTI)

.g. PJM), hybrid independent system operator/independent transmission owner (e.g. Nord Pool) and vertical integration (e.g. traditional European model). • We address the question: What is the evidence for the superiority of the ownership unbundled... transmission operation from the rest of the sector while transmission assets remain under the same ownership as generation/production or retail. This is an increasingly common model. 3. The independent system operator - ISO - model, e.g. PJM in the US...

Pollitt, Michael G.

389

Megawatts vs. Negawatts: how a little can do a lot  

Science Conference Proceedings (OSTI)

In some quarters there is increased emphasis on overall reduction of energy usage from customers. One indication of the growing significance of negawatts is apparent at PJM Interconnection, where customers are encouraged to bid negative load into the wholesale market in direct competition with megawatts. This negative load, while not large in absolute terms relative to the 164 GW size of the PJM market, is nevertheless critical in introducing an element of price elasticity into what would otherwise be a virtually inelastic demand.

NONE

2008-11-15T23:59:59.000Z

390

A Comparison of Electricity Market Designs in Networks  

E-Print Network (OSTI)

according to a well defined protocol. Such a design, as implemented for example in New England and PJM (Pennsylvania, New Jersey Mary- land and neighbouring states), ensures that different locational markets are automatically arbitraged and the network... includes marginal loss calculations. Furthermore, they have like PJM a multi-settlement system with integrated day-ahead and balancing market. The possibility to implement these additional features in a consistent way can be seen as an additional benefit...

Ehrenmann, A; Neuhoff, Karsten

2004-06-16T23:59:59.000Z

391

Midwest Transmission Workshop II Summary  

DOE Green Energy (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

392

Figure 33. Ratio of average per megawatthour fuel costs for ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 33. Ratio of average per megawatthour fuel costs for natural gas combined-cycle plants to coal-fired steam turbines in the SERC southeast ...

393

N W Electric Power Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

W Electric Power Coop, Inc Jump to: navigation, search Name N W Electric Power Coop, Inc Place Missouri Utility Id 13190 Utility Location Yes Ownership C NERC Location SERC NERC...

394

Modeling Interregional Transmission Congestion in the National Energy Modeling System  

E-Print Network (OSTI)

Rocky Mtn Ariz NM (12) Combined Cycle built in SERC (9) Theincludes all out of region combined cycle generation that iscombined with the traditional grid. • Remove the bias towards gas fired combine cycle

Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

2006-01-01T23:59:59.000Z

395

EIA - State Electricity Profiles - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Table 1. 2010 Summary Statistics (Texas) Item Value U.S. Rank; NERC Region(s) SERC/SPP/TRE/WECC: Primary Energy Source : Gas: Net Summer Capacity (megawatts)

396

The potential impacts of a competitive wholesale market in the midwest: A preliminary examination of centralized dispatch  

SciTech Connect

In March 2005, the Midwest Independent System Operator (MISO) will begin operating the first-ever wholesale market for electricity in the central and upper Midwestern portion of the United States. Region-wide, centralized, security-constrained, bid-based dispatch will replace the current system of decentralized dispatch by individual utilities and control areas. This report focuses on how the operation of generators may change under centralized dispatch. We analyze a stylized example of these changes by comparing a base case dispatch based on a ''snapshot'' taken from MISO's state estimator for an actual, historical dispatch (4 p.m., July 7, 2003) to a hypothetical, centralized dispatch that seeks to minimize the total system cost of production, using estimated cost data collected by the EIA. Based on these changes in dispatch, we calculate locational marginal prices, which in turn reveals the location of congestion within MISO's footprint, as well as the distribution of congestion revenues. We also consider two sensitivity scenarios that examine (1) the effect of changes in MISO membership (2003 vs. 2004 membership lists), and (2) different load and electrical data, based on a snapshot from a different date and time (1 p.m., Feb. 18, 2004). Although our analysis offers important insights into how the MISO market could operate when it opens, we do not address the question of the total benefits or costs of creating a wholesale market in the Midwest.

Lesieutre, Bernard C.; Bartholomew, Emily; Eto, Joseph H.; Hale, Douglas; Luong, Thanh

2004-07-01T23:59:59.000Z

397

The potential impacts of a competitive wholesale market in the midwest: A preliminary examination of centralized dispatch  

SciTech Connect

In March 2005, the Midwest Independent System Operator (MISO) will begin operating the first-ever wholesale market for electricity in the central and upper Midwestern portion of the United States. Region-wide, centralized, security-constrained, bid-based dispatch will replace the current system of decentralized dispatch by individual utilities and control areas. This report focuses on how the operation of generators may change under centralized dispatch. We analyze a stylized example of these changes by comparing a base case dispatch based on a ''snapshot'' taken from MISO's state estimator for an actual, historical dispatch (4 p.m., July 7, 2003) to a hypothetical, centralized dispatch that seeks to minimize the total system cost of production, using estimated cost data collected by the EIA. Based on these changes in dispatch, we calculate locational marginal prices, which in turn reveals the location of congestion within MISO's footprint, as well as the distribution of congestion revenues. We also consider two sensitivity scenarios that examine (1) the effect of changes in MISO membership (2003 vs. 2004 membership lists), and (2) different load and electrical data, based on a snapshot from a different date and time (1 p.m., Feb. 18, 2004). Although our analysis offers important insights into how the MISO market could operate when it opens, we do not address the question of the total benefits or costs of creating a wholesale market in the Midwest.

Lesieutre, Bernard C.; Bartholomew, Emily; Eto, Joseph H.; Hale, Douglas; Luong, Thanh

2004-07-01T23:59:59.000Z

398

Microsoft Word - July Heat 7-19 v3  

Gasoline and Diesel Fuel Update (EIA)

forecast to peak today, with the highest forecast to peak today, with the highest temperatures nearing triple digits across the Northeast and Mid-Atlantic. Electricity prices: Day-ahead prices for certain peak hours reached above $200/MWh in New England and PJM West, above $300/MWh in New York City, and hit $350/MWh in Long Island. Usual prices for these areas are $30-$60/MWh. The on-peak daily price at PJM West continued to decline from its Wednesday peak as the heat moved out of the Midwest. Electricity demand: System demand in New York is expected to surpass its all-time system peak while PJM and New England are forecast to be 96% and 99% of their respective all-time peaks.

399

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 24200 of 26,764 results. 91 - 24200 of 26,764 results. Download Before the House Science, Space, and Technology Subcommittee on Investigations and Oversight Subject: Rare Earth Elements By: David Sandalow, Assistant Secretary Office of Policy and International Affairs http://energy.gov/congressional/downloads/house-science-space-and-technology-subcommittee-investigations-and-oversight Download PJM Presentation- The Silver Bullet: Storage! (July 12, 2011) Presentation by Terry Boston, President and CEO pf PJM Interconnection before the Electricity Advisorty Committee, July 12, 2011, on storage for the smart grid. http://energy.gov/oe/downloads/pjm-presentation-silver-bullet-storage-july-12-2011 Download Secretary of Energy Advisory Board- July 20, 2011 Meeting Minutes SEAB members heard opening remarks from Chairman Perry and Secretary Chu.

400

Re: Potomac River Generating Station Department of Energy Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Notice of Power Outages. Advanced Notice of Power Outages. Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01. Order No. 202-05-03: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission outages that are scheduled for the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the captioned proceeding, Order No. 202-05-03 ("December 20 Order"), Pepco will provide advance notification of the outages to Mirant, PJM, the Department of Energy ("Department"), the Federal Energy Regulatory Commission, the Environmental Protection Agency,

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Fe  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM PJM Interconnection-Pete Langbein Prepared for the National Forum on the National Action Plan on Demand Response: Program Design and Implementation Working Group AUTHOR: Dan Delurey-Association for Demand Response and Smart Grid National Forum of the National Action Plan on Demand Response Case Study Interview: PJM Interconnection-Pete Langbein was developed to fulfill part of the Implementation Proposal for The National Action Plan on Demand Response, a report to Congress jointly issued by the U.S. Department of Energy (DOE) and the Federal Energy Regulatory Commission (FERC) in June 2011. Part of that implementation proposal called for a "National Forum" on demand response to be conducted by DOE and FERC. Given the rapid development of the demand response industry, DOE and FERC decided

402

Notices  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Federal Register 7 Federal Register / Vol. 77, No. 249 / Friday, December 28, 2012 / Notices 1 On November 16, 2011, DOE's Acting General Counsel delegated to Western's Administrator all the authorities of the General Counsel respecting environmental impact statements. Description: PJM Interconnection, L.L.C. submits tariff filing per 35.15: Notice of Cancellation-First Revised SA Nos. 3156 & 3157 in Dkt No. ER12-835- 000 to be effective 12/5/2012. Filed Date: 12/19/12. Accession Number: 20121219-5086. Comments Due: 5 p.m. ET 1/9/13. Docket Numbers: ER13-584-000. Applicants: PJM Interconnection, L.L.C. Description: PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: First Revised Service Agreement No. 3279; Queue No. X1-046 to be effective 12/3/2012.

403

O:\EA-168.ORD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM is a security coordinator in the Mid-Atlantic Area Council (MAAP) region of the North American Electric Reliability PJM is a security coordinator in the Mid-Atlantic Area Council (MAAP) region of the North American Electric Reliability 1 Council (NERC). PJM administers the regional energy markets in Pennsylvania, New Jersey, Maryland, Delaware, Virginia and the District of Columbia. 1 PG&E Energy Trading - Power, L.P. Order No. EA-168 I. BACKGROUND Exports of electric energy from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On December 15, 1997, USGen Power Services, L.P. (USGen) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. On February 19, 1998, the applicant notified FE that the

404

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B 2-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company and PJM.

405

Valley Forge Corporate Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55 Jefferson Ave. 55 Jefferson Ave. Valley Forge Corporate Center Norristown, PA 19403-2497 Pauline Foley Assistant General Counsel 610.666.8248 | Fax - 610.666.8211 foleyp@pjm.com October 30, 2013 Via Electronic Mail: juliea.smith@hq.doe.gov Christopher.lawrence@hq.doe.gov Julie A. Smith Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue, SW Washington, D.C. 20585 Re: Department of Energy - Improving Performance of Federal Permitting and Review of Infrastructure Projects. Request for Information ("RFI") 78 Fed. Reg. 53436 (August 29, 2013) Dear Ms. Smith: Please accept the following comments submitted on behalf of PJM Interconnection, L.L.C. ("PJM") in response to the RFI issued in the above captioned matter. This letter responds

406

Potomac River Generating Station Dept. of Energy Case No. EO-05-01; September 8, 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Craig A. Glazer Craig A. Glazer Vice President - Federal Government Policy PJM Washington Office (202) 393-7756 .FAX (202) 393-7741 e-mail: glazec@pjm.com CRITICAL ENERGY INFRASTRUCTURE INFORMATION HAS BEEN REMOVED FROM THIS SUBMITTAL FOR PRIVILEGED TREATMENT September 8, 2005 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Dept. of Energy Case No. EO-05-01 Dear Mr. Mansueti: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions associated with the unavailability of the Potomac River Generating Station to serve load in the D.C. area.

407

B-15 VANC-1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 October 1, 2006 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule VANC-1 Availability: This rate schedule shall be available to public bodies and cooperatives or their agents (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom transmission is provided from the PJM Interconnection LLC (hereinafter called PJM) or Carolina Power & Light Company (hereinafter called CP&L). The Customer must have a contractual arrangement with the Gove rnment to provide this service and currently pay the tandem transmission rate under another Kerr-Philpott rate schedule. Applicability: This rate schedule shall be applicable to transmission services provided and sold

408

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B 3-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability:

409

Microsoft Word - 052606 Final Pepco DOE maintenance notice.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2006 26, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti, Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage scheduled for the upcoming weekend. Pepco notes that the scheduled maintenance activities are not associated with its new transmission line installation, but are routine maintenance activities resulting from a switch problem identified during routine

410

Microsoft Word - 00095397.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

) International Transmission Company ) Docket No. PP-230-4 d/b/a ITC Transmission ) PETITION TO INTERVENE OUT OF TIME AND COMMENTS OF PEPCO HOLDINGS, INC. Pepco Holdings, Inc. ("PHI"), on its own behalf and on behalf of its affiliates Potomac Electric Power Company ("Pepco"), Atlantic City Electric Company ("Atlantic City"), and Delmarva Power & Light Company ("Delmarva") (collectively, the "PHI Companies"), respectfully submits this petition to intervene out of time and comments in support of the March 25, 2011 filing by PJM Interconnection, L.L.C. ("PJM") in the above-captioned proceeding. 1 I. Communications The PHI Companies designate the following individuals to receive service of all filings

411

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-B 1-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an

412

DOE_EnergyEfficiencyStandardsForLargeVolumeWaterHeaters.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 6, 2012 September 6, 2012 Scott Baker Sr. Business Solutions Analyst Bakers1@pjm.com (610) 666-2235 VIA EMAIL U.S. Department of Energy Email: expartecommunications@hq.doe.gov RE: Ex Parte Communication, Docket EERE-2012-BT-STD-0022 To whom it may concern, On September 5, 2012, representatives from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, and the Steffes Corporation (together, "Joint Commenters") met with members of the Department of Energy ("Department") to discuss the request for information "[...] Energy

413

General Renewable Energy Technology Module | Open Energy Information  

Open Energy Info (EERE)

General Renewable Energy Technology Module General Renewable Energy Technology Module Jump to: navigation, search Tool Summary LAUNCH TOOL Name: General Renewable Energy Technology Module Agency/Company /Organization: World Bank Sector: Energy Focus Area: Renewable Energy Topics: Technology characterizations Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, References: General Renewable Energy Technology Module[1] Resource Generation and Transmission Interconnection Process Overview, PJM Manual, Transmission and Interconnection Planning Department, System Planning Division, PJM Interconnection, LLC References ↑ "General Renewable Energy Technology Module" Retrieved from "http://en.openei.org/w/index.php?title=General_Renewable_Energy_Technology_Module&oldid=328701

414

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B 3-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and

415

Midwest Independent System Operator (Multiple States) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent System Operator (Multiple States) Independent System Operator (Multiple States) Midwest Independent System Operator (Multiple States) < Back Eligibility Developer Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Interconnection Provider Midwest Independent System Operator Midwest Independent Transmission System Operator (MISO) is a Regional Transmission Organization, which administers wholesale electricity markets in all or parts of 11 U.S. states and the Canadian province of Manitoba. MISO administers electricity transmission grids across the Midwest and into Canada, and provides tools, transmission planning strategies, and integration for utilities in those markets.

416

DOE: Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets  

DOE Green Energy (OSTI)

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The DOE-funded project 'Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets' aims to evaluate the benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of different balancing approaches with increasing levels of inter-regional cooperation. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. The primary analysis of the project is based on unit commitment (UC) and economic dispatch (ED) simulations of the SPP-SERC regions as modeled for the year 2022. The UC/ED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as accurately as possible realizing that all such future scenario models are quite uncertain. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy. The analysis aspects of the project comprised 4 primary tasks: (1) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with only 7 GW of installed wind capacity in SPP for internal SPP consumption with no intended wind exports to SERC. This model is referred to as the 'Non-RES' model as it does not reflect the need for the SPP or SERC BAs to meet a federal Renewable Energy Standard (RES). (2) Analysis of hourly-resolution simulation results of the Non-RES model for the year 2022 to provide project stakeholders with confidence in the model and analytical framework for a scenario that is similar to the existing system and more easily evaluated than the high-wind transfer scenarios that are analyzed subsequently. (3) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with sufficient installed wind capacity in SPP (approximately 48 GW) for both SPP and the participating SERC BAs to meet an RES of 20% energy. This model is referred to as the 'High-Wind Transfer' model with several different scenarios represented. The development of the High-Wind Transfer model not only included identification and allocation of SPP wind to individual SERC BAs, but also included the evaluation of various methods to allow the model to export the SPP wind to SERC without developing an actual transmission plan to support the transfers. (4) Analysis of hourly-resolution simulation results of several different High-Wind Transfer model scenarios for the year 2022 to determine balancing costs and potential benefits of collaboration among SPP and SERC BAs to provide the required balancing.

Brooks, Daniel, EPRI; Tuohy, Aidan, EPRI; Deb, Sidart, LCG Consulting; Jampani, Srinivas, LCG Consulting; Kirby, Brendan, Consultant; King, Jack, Consultant

2011-11-29T23:59:59.000Z

417

REVIEW----DOE RESPONSE.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

) ) International Transmission Company ) Docket No. PP-230-4 d/b/a ITCTransmission ) RESPONSE OF PJM INTERCONNECTION, L.L.C. TO ANSWER OF INTERNATIONAL TRANSMISSION COMPANY d/b/a ITCTransmission AND SUPPLEMENTAL COMMENTS ON BEHALF OF THE MIDWEST INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC. On April 14, 2011, International Transmission Company, d/b/a ITCTransmission ("ITC" or "Applicant") filed an answer

418

Megawatt-Class Lithium Ion Energy Storage Systems  

Science Conference Proceedings (OSTI)

This project describes the most recent developments in the use of energy storage in frequency regulation and other ancillary service applications. This includes an analysis of limited storage in frequency regulation applications in the Pennsylvania-New Jersey-Maryland Interconnection (PJM), as well as a case study of a lithium ion energy storage system installed in California.

2009-12-22T23:59:59.000Z

419

Non-stationary Signal Forecasting by Neural Network with Modified Neurons  

Science Conference Proceedings (OSTI)

This paper presents the non-stationary power signal forecasting by using a neural network with modified neurons for PJM data set provided by Independent Electricity System Operator (IESO). In this data set, the load information is the sum of power load ... Keywords: load, forecasting, neural model, modified neurons

Chih-Chien Huang; Yi-Ching Lin; Yu-Ju Chen; Shuming T. Wang; Rey-Chue Hwang

2010-03-01T23:59:59.000Z

420

Transmission Pricing of Distributed Multilateral Energy Transactions to Ensure System Security and Guide Economic Dispatch  

E-Print Network (OSTI)

] Alvarado, F and R. Rajamaran Inefficienceis of NERC’s Transmission Loading Relief Procedures Electricity Journal, v. 11 no. 8, Oct. 1998. [2] Hogan, W. Getting the Prices Right in PJM; What the Data Teaches Us Electricity Journal, v.11 no. 7, Aug. 1998. [3...

Ilic, Marija; Hsieh, Eric; Remanan, Prasad

2004-06-16T23:59:59.000Z

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Network-constrained models of liberalized electricity markets: the devil is in the details  

E-Print Network (OSTI)

submitted by generators, e.g., in PJM or Nordpool. If generators submit less energy to one node, then the higher price at 17 the node makes energy imports into that node more valuable. As a result, more of the scarce transmission capacity will be used...

Barquin, J; Boots, M G; Ehrenmann, A; Hobbs, Benjamin F; Neuhoff, Karsten; Rijkers, F A M

2004-06-16T23:59:59.000Z

422

OCEAN DRILLING PROGRAM LEG 141 SCIENTIFIC PROSPECTUS  

E-Print Network (OSTI)

¼ 1 mm, Def ¼ D ¼ 1000 mm2 /s [47], Ce ¼ 0:03 nm�3 (Ref. [23, p. 173]) and kEsdh ¼ 15 pJ/m (sE20 mJ/m2

423

Column basis reduction and decomposable knapsack problems  

E-Print Network (OSTI)

A:,j. ? cn(r +1)?k. (6.14). To get a contradiction, suppose ˜pj = 0. Then, since ˜pj is integral,. ˜. A:,j. ? |˜aj|. = |˜pjM + ˜rj|. ? M ? |˜rj|. (6.15). Hence. M ?. ˜. A:,j. +|˜rj|.

424

Congestion management in electricity networks  

E-Print Network (OSTI)

 are accepted and their payments. Nodal pricing or locational  marginal pricing (LMP) is used in Argentina, Chile, Ireland, New Zealand, Russia, Singapore,  in several US states (e.g. California, New England, New York, PJM and Texas), and Poland is on  the  way  to  implement  it  as  well.  This  design  acknowledges...

Holmberg, Pärr; Lazarczyk, Ewa

2012-04-25T23:59:59.000Z

425

Utilities Policy 11 (2003) 7586 www.socscinet.com/bam/jup  

E-Print Network (OSTI)

­NewJersey­Maryland (PJM) elec- tricity market is enjoying low energy prices. In fact, the users of this market initially of the trading in the California for- ward markets.6 The PX ran auctions to establish energy prices and schedules contracts to tailor consumers' needs. The energy prices in the different SCs converge as trading among SCs

Marathe, Achla

426

Optimal Real-time Dispatch for Integrated Energy Systems  

E-Print Network (OSTI)

and HVAC operations. A real-time optimization program suchHVAC IES ISO-NE LBNL MILP NOx NP NRC NREL OLS P&DC PJM PUCT PURPA PV RETScreen RReDC Hybrid OptimizationHVAC equipment and other building energy equipment. This research is similar to the IES dispatch optimization

Firestone, Ryan Michael

2007-01-01T23:59:59.000Z

427

Assessing the efficiency of US electricity markets  

SciTech Connect

The recent California's energy crisis has raised doubts about the benefits of energy deregulation. While it is true that the California electricity market is in turmoil, other electricity markets like the Pennsylvania-New Jersey-Maryland (PJM) are doing fine. This paper assesses the mark of efficiency reached by the electricity markets in California, New York, and PJM. It also compares the degree of efficiency across markets (forward vs. real time) and across time. In terms of market efficiency no significant differences between the California and PJM electricity markets were discovered in the year of California's energy crisis (2000). This research suggests that differences in price behavior between these two markets during 2000 did not arise from differences in efficiency. According to our analysis and measure of efficiency, PJM and California electricity markets are more efficient than the New York market. Also, as these markets become more mature over time, their efficiency goes up. We also found evidence that multi-settlement scheduling system leads to higher efficiency.

Arciniegas, I. E. (Ismael E.); Barrett, C. L. (Christopher L.); Marathe, A. (Achla)

2001-01-01T23:59:59.000Z

428

Modeling of biogas generation in bioreactor landfills using neuro-fuzzy system  

Science Conference Proceedings (OSTI)

Biogas generation in anaerobic bioreactor landfills is modeled using the neuro-fuzzy system. The implemented inference system was an adaptive neuro-fuzzy inference system (ANFIS). The fuzzy logic controller featured a Multi-Input-Single-Output (MISO) ... Keywords: biogas generation, bioreactor landfills, neuro-fuzzy model

Mohamed S. Abdallah; Leta Fernandes; Mostafa A. Warith

2008-08-01T23:59:59.000Z

429

Kheshbn No. 102- Fall 1983 - Journal  

E-Print Network (OSTI)

w x :otenyaa«x in ogn po .ûn oio px) nanV Dig tn miso n ooya05708O 7*K 7teas8 tx 78 07**te oio 7P8^ 572*173 577*x i*ix .yvtepn tomuT igi to pyn ,oio»nx pn _ itwo lis tant) youny h

1983-01-01T23:59:59.000Z

430

Tornadoes and Downbursts in the Context of Generalized Planetary Scales  

Science Conference Proceedings (OSTI)

In order to cover a wide range of horizontal dimensions of airflow, the author proposes a series of five scales, maso, meso, miso (to be read as my-so), moso and muso arranged in the order of the vowels, A, E, 1, O, U. The dimensions decrease by ...

T. Theodore Fujita

1981-08-01T23:59:59.000Z

431

Integrated Retail & Wholesale Power System Operation  

E-Print Network (OSTI)

Aliprantis & Leigh Tesfatsion Last Revised: 10 August 2010 1 #12;EPRC-DOE/PNNL Combined Project: Integrated Advisors: David Chassin (DOE/PNNL, Richland, WA) & GridLAB-D Team (PNNL) Todd Hillman and Nivad Navid (MISO Thomas (EPRC Support, ECpE M.S. Student, ISU) Huan Zhao (DOE/PNNL Support, Econ PhD Student, ISU) Start

Tesfatsion, Leigh

432

The Summer of 2006: A Milestone in the Ongoing Maturation of Demand Response  

E-Print Network (OSTI)

Edison (SCE) Ameren Duke Energy (Indiana/Ohio) EON* Exelon*Gas (PSE&G) Southeast • Duke Energy (North Carolina) • GulfDuke: 4-6 events in different states • EON: 11 events • KCP&L: July 17, 19, 20, 31; August Midwest MISO Energy

Hopper, Nicole; Goldman, Charles; Bharvirkar, Ranjit; Engel, Dan

2007-01-01T23:59:59.000Z

433

Integrated Retail and Wholesale (IRW) Power System Operations with Smart-Grid Functionality  

E-Print Network (OSTI)

Integrated Retail and Wholesale (IRW) Power System Operations with Smart-Grid Functionality Leigh-NE, MISO, XM, RTE, MEC IRW Project: Integrated Retail/Wholesale Power System Operation with Smart-Grid Functionality 3 #12;4 Meaning of "Smart Grid Functionality"? For our project purposes: Smart-grid functionality

Tesfatsion, Leigh

434

Slide 1  

U.S. Energy Information Administration (EIA) Indexed Site

11 10 19 22 21 20 15 14 9 13 5 5 6 1 2 3 4 16 17 8 18 Electricity Market Module Regions 1 - Texas Reliability Entity (ERCT) 2 - Florida Reliability Coordinating Council (FRCC) 3 - Midwest Reliability Organization - East (MROE) 4 - Midwest Reliability Organization - West (MROW) 5 - Northeast Power Coordinating Council / New England (NEWE) 6 - Northeast Power Coordinating Council / NYC - Westchester (NYCW) 7 - Northeast Power Coordinating Council / Long Island (NYLI) 8 - Northeast Power Coordinating Council / Upstate New York (NYUP) 9 - Reliability First Corporation/ East (RFCE) 10 - Reliability First Corporation/Michigan (RFCM ) 11 - Reliability First Corporation/West (RFCW) 12 - SERC Reliability Corporation / Delta (SRDA) 13 - SERC Reliability Corporation / Gateway (SRGW)

435

Property:EIA/861/NercLocation | Open Energy Information  

Open Energy Info (EERE)

NercLocation NercLocation Jump to: navigation, search This is a property of type String. Description: Nerc Location NERC Location: The North American Electric Reliability Corporation (NERC) region where the utility has its primary business operations (service territory), electrical generation, transmission, and distribution equipment, and its administrative headquarters. Some utilities have business operations and service areas in more than one NERC region. Power marketers, because they generally have only office equipment, can have business operations in any NERC region. FRCC = Florida Reliability Coordinating Council; MRO = Midwest Reliability Organization; NPCC = Northeast Power Coordinating Council; RFC = Reliability First Corporation (formerly MAAC, MAIN and ECAR); SERC = SERC Reliability Corporation; SPP =

436

Pulse Jet Mixer Overblow Testing for Assessment of Loadings During Multiple Overblows  

SciTech Connect

The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment Plant (WTP) is being designed and built to pretreat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks. The WTP consists of three primary facilities: pretreatment, low-activity waste (LAW) vitrification, and high-level waste (HLW) vitrification. The pretreatment facility will receive waste feed from the Hanford tank farms and separate it into 1) a high-volume, low-activity liquid stream stripped of most solids and radionuclides and 2) a much smaller volume of HLW slurry containing most of the solids and most of the radioactivity. Many of the vessels in the pretreatment facility will contain pulse jet mixers (PJMs) that will provide some or all of the mixing in the vessels. This technology was selected for use in so-called “black cell” regions of the WTP, where maintenance capability will not be available for the operating life of the WTP. PJM technology was selected for use in these regions because it has no moving mechanical parts that require maintenance. The vessels with the most concentrated slurries will also be mixed with air spargers and/or steady jets in addition to the mixing provided by the PJMs. This report contains the results of single and multiple PJM overblow tests conducted in a large, ~13 ft-diameter × 15-ft-tall tank located in the high bay of the Pacific Northwest National Laboratory (PNNL) 336 Building test facility. These single and multiple PJM overblow tests were conducted using water and a clay simulant to bound the lower and upper rheological properties of the waste streams anticipated to be processed in the WTP. Hydrodynamic pressures were measured at a number of locations in the test vessel using an array of nine pressure sensors and four hydrophones. These measurements were made under normal and limiting vessel operating conditions (i.e., maximum PJM fluid emptying velocity, maximum and minimum vessel contents for PJM operation, and maximum and minimum rheological properties). Test data collected from the PJM overblow tests were provided to Bechtel National, Inc. (BNI) for assessing hydrostatic, dynamic, and acoustic pressure loadings on in-tank structures during 1) single overblows; 2) multiple overlapping overblows of two to four PJMs; 3) simultaneous overblows of pairs of PJMs.

Pfund, David M.; Bontha, Jagannadha R.; Michener, Thomas E.; Nigl, Franz; Yokuda, Satoru T.; Leigh, Richard J.; Golovich, Elizabeth C.; Baumann, Aaron W.; Kurath, Dean E.; Hoza, Mark; Combs, William H.; Fort, James A.; Bredt, Ofelia P.

2008-03-03T23:59:59.000Z

437

Pulse Jet Mixer Overblow Testing for Assessment of Loadings During Multiple Overblows  

SciTech Connect

The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment Plant (WTP) is being designed and built to pretreat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks. The WTP consists of three primary facilities: pretreatment, low-activity waste (LAW) vitrification, and high-level waste (HLW) vitrification. The pretreatment facility will receive waste feed from the Hanford tank farms and separate it into 1) a high-volume, low-activity liquid stream stripped of most solids and radionuclides and 2) a much smaller volume of HLW slurry containing most of the solids and most of the radioactivity. Many of the vessels in the pretreatment facility will contain pulse jet mixers (PJMs) that will provide some or all of the mixing in the vessels. This technology was selected for use in so-called “black cell” regions of the WTP, where maintenance capability will not be available for the operating life of the WTP. PJM technology was selected for use in these regions because it has no moving mechanical parts that require maintenance. The vessels with the most concentrated slurries will also be mixed with air spargers and/or steady jets in addition to the mixing provided by the PJMs. This report contains the results of single and multiple PJM overblow tests conducted in a large, ~13 ft-diameter × 15-ft-tall tank located in the high bay of the Pacific Northwest National Laboratory (PNNL) 336 Building test facility. These single and multiple PJM overblow tests were conducted using water and a clay simulant to bound the lower and upper rheological properties of the waste streams anticipated to be processed in the WTP. Hydrodynamic pressures were measured at a number of locations in the test vessel using an array of nine pressure sensors and four hydrophones. These measurements were made under normal and limiting vessel operating conditions (i.e., maximum PJM fluid emptying velocity, maximum and minimum vessel contents for PJM operation, and maximum and minimum rheological properties). Test data collected from the PJM overblow tests were provided to Bechtel National, Inc. (BNI) for assessing hydrostatic, dynamic, and acoustic pressure loadings on in-tank structures during 1) single overblows; 2) multiple overlapping overblows of two to four PJMs; 3) simultaneous overblows of pairs of PJMs.

Pfund, David M.; Bontha, Jagannadha R.; Michener, Thomas E.; Nigl, Franz; Yokuda, Satoru T.; Leigh, Richard J.; Golovich, Elizabeth C.; Baumann, Aaron W.; Kurath, Dean E.; Hoza, Mark; Combs, William H.; Fort, James A.; Bredt, Ofelia P.

2009-07-20T23:59:59.000Z

438

Microsoft Word - alabama.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Alabama Alabama NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 32,417 9 Electric Utilities ...................................................................................................... 23,642 7 Independent Power Producers & Combined Heat and Power ................................ 8,775 12 Net Generation (megawatthours) ........................................................................... 152,150,512 6

439

Microsoft Word - south_carolina.doc  

U.S. Energy Information Administration (EIA) Indexed Site

South Carolina South Carolina NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Nuclear Net Summer Capacity (megawatts) ....................................................................... 23,982 17 Electric Utilities ...................................................................................................... 22,172 9 Independent Power Producers & Combined Heat and Power ................................ 1,810 35 Net Generation (megawatthours) ........................................................................... 104,153,133 14

440

Microsoft Word - mississippi.doc  

Gasoline and Diesel Fuel Update (EIA)

Mississippi Mississippi NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Gas Net Summer Capacity (megawatts) ....................................................................... 15,691 26 Electric Utilities ...................................................................................................... 10,858 26 Independent Power Producers & Combined Heat and Power ................................ 4,833 18 Net Generation (megawatthours) ........................................................................... 54,487,260 28

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Microsoft Word - louisiana.doc  

Gasoline and Diesel Fuel Update (EIA)

Louisiana Louisiana NERC Region(s) ....................................................................................................... SERC/SPP Primary Energy Source........................................................................................... Gas Net Summer Capacity (megawatts) ....................................................................... 26,744 14 Electric Utilities ...................................................................................................... 16,471 17 Independent Power Producers & Combined Heat and Power ................................ 10,272 10 Net Generation (megawatthours) ........................................................................... 102,884,940 16

442

Microsoft Word - arkansas.doc  

Gasoline and Diesel Fuel Update (EIA)

Arkansas Arkansas NERC Region(s) ....................................................................................................... SERC/SPP Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 15,981 25 Electric Utilities ...................................................................................................... 11,488 23 Independent Power Producers & Combined Heat and Power ................................ 4,493 24 Net Generation (megawatthours) ........................................................................... 61,000,185 25

443

Microsoft Word - virginia.doc  

Gasoline and Diesel Fuel Update (EIA)

Virginia Virginia NERC Region(s) ....................................................................................................... RFC/SERC Primary Energy Source........................................................................................... Nuclear Net Summer Capacity (megawatts) ....................................................................... 24,109 16 Electric Utilities ...................................................................................................... 19,434 15 Independent Power Producers & Combined Heat and Power ................................ 4,676 21 Net Generation (megawatthours) ........................................................................... 72,966,456 21

444

Microsoft Word - south_carolina.doc  

Gasoline and Diesel Fuel Update (EIA)

South Carolina South Carolina NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Nuclear Net Summer Capacity (megawatts) ....................................................................... 23,982 17 Electric Utilities ...................................................................................................... 22,172 9 Independent Power Producers & Combined Heat and Power ................................ 1,810 35 Net Generation (megawatthours) ........................................................................... 104,153,133 14

445

Microsoft Word - kentucky.doc  

Gasoline and Diesel Fuel Update (EIA)

Kentucky Kentucky NERC Region(s) ....................................................................................................... RFC/SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 20,453 21 Electric Utilities ...................................................................................................... 18,945 16 Independent Power Producers & Combined Heat and Power ................................ 1,507 38 Net Generation (megawatthours) ........................................................................... 98,217,658 17

446

Microsoft Word - virginia.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Virginia Virginia NERC Region(s) ....................................................................................................... RFC/SERC Primary Energy Source........................................................................................... Nuclear Net Summer Capacity (megawatts) ....................................................................... 24,109 16 Electric Utilities ...................................................................................................... 19,434 15 Independent Power Producers & Combined Heat and Power ................................ 4,676 21 Net Generation (megawatthours) ........................................................................... 72,966,456 21

447

Microsoft Word - iowa.doc  

Gasoline and Diesel Fuel Update (EIA)

Iowa Iowa NERC Region(s) ....................................................................................................... MRO/SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 14,592 28 Electric Utilities ...................................................................................................... 11,282 24 Independent Power Producers & Combined Heat and Power ................................ 3,310 30 Net Generation (megawatthours) ........................................................................... 57,508,721 26

448

Microsoft Word - north_carolina.doc  

Gasoline and Diesel Fuel Update (EIA)

Carolina Carolina NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 27,674 12 Electric Utilities ...................................................................................................... 25,553 6 Independent Power Producers & Combined Heat and Power ................................ 2,121 34 Net Generation (megawatthours) ........................................................................... 128,678,483 10

449

Microsoft Word - texas.doc  

Gasoline and Diesel Fuel Update (EIA)

Texas Texas NERC Region(s) ....................................................................................................... SERC/SPP/TRE/WECC Primary Energy Source........................................................................................... Gas Net Summer Capacity (megawatts) ....................................................................... 108,258 1 Electric Utilities ...................................................................................................... 26,533 4 Independent Power Producers & Combined Heat and Power ................................ 81,724 1 Net Generation (megawatthours) ........................................................................... 411,695,046 1

450

Microsoft Word - georgia.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Georgia Georgia NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 36,636 7 Electric Utilities ...................................................................................................... 26,639 3 Independent Power Producers & Combined Heat and Power ................................ 9,998 11 Net Generation (megawatthours) ........................................................................... 137,576,941 8

451

Microsoft Word - mississippi.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Mississippi Mississippi NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Gas Net Summer Capacity (megawatts) ....................................................................... 15,691 26 Electric Utilities ...................................................................................................... 10,858 26 Independent Power Producers & Combined Heat and Power ................................ 4,833 18 Net Generation (megawatthours) ........................................................................... 54,487,260 28

452

Microsoft Word - alabama.doc  

Gasoline and Diesel Fuel Update (EIA)

Alabama Alabama NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 32,417 9 Electric Utilities ...................................................................................................... 23,642 7 Independent Power Producers & Combined Heat and Power ................................ 8,775 12 Net Generation (megawatthours) ........................................................................... 152,150,512 6

453

Microsoft Word - illinois.doc  

Gasoline and Diesel Fuel Update (EIA)

Illinois Illinois NERC Region(s) ....................................................................................................... MRO/RFC/SERC Primary Energy Source........................................................................................... Nuclear Net Summer Capacity (megawatts) ....................................................................... 44,127 5 Electric Utilities ...................................................................................................... 4,800 35 Independent Power Producers & Combined Heat and Power ................................ 39,327 3 Net Generation (megawatthours) ........................................................................... 201,351,872 5

454

Microsoft Word - north_carolina.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Carolina Carolina NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 27,674 12 Electric Utilities ...................................................................................................... 25,553 6 Independent Power Producers & Combined Heat and Power ................................ 2,121 34 Net Generation (megawatthours) ........................................................................... 128,678,483 10

455

Microsoft Word - missouri.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Missouri Missouri NERC Region(s) ....................................................................................................... SERC/SPP Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 21,739 18 Electric Utilities ...................................................................................................... 20,360 12 Independent Power Producers & Combined Heat and Power ................................ 1,378 39 Net Generation (megawatthours) ........................................................................... 92,312,989 18

456

Microsoft Word - florida.doc  

Gasoline and Diesel Fuel Update (EIA)

Florida Florida NERC Region(s) ....................................................................................................... FRCC/SERC Primary Energy Source........................................................................................... Gas Net Summer Capacity (megawatts) ....................................................................... 59,147 3 Electric Utilities ...................................................................................................... 50,853 1 Independent Power Producers & Combined Heat and Power ................................ 8,294 13 Net Generation (megawatthours) ........................................................................... 229,095,935 3

457

Microsoft Word - georgia.doc  

Gasoline and Diesel Fuel Update (EIA)

Georgia Georgia NERC Region(s) ....................................................................................................... SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 36,636 7 Electric Utilities ...................................................................................................... 26,639 3 Independent Power Producers & Combined Heat and Power ................................ 9,998 11 Net Generation (megawatthours) ........................................................................... 137,576,941 8

458

schedule6_2004.xls  

Annual Energy Outlook 2012 (EIA)

AC 345 345 0 Deerfield SS 391 Tap 0.1 OH P O 0 0 0 0 15472 I 0 U NPCC NE AC 230 230 0 Granite SS Middlesex SS 16 OH P O 0 0 0 0 19899 I 0 U SERC SOU AC 230 230 602 5202005...

459

Microsoft Word - tennessee.doc  

Gasoline and Diesel Fuel Update (EIA)

Tennessee Tennessee NERC Region(s) ....................................................................................................... RFC/SERC Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 21,417 19 Electric Utilities ...................................................................................................... 20,968 11 Independent Power Producers & Combined Heat and Power ................................ 450 49 Net Generation (megawatthours) ........................................................................... 82,348,625 19

460

Proposed Specifications for Implementation of Fifth Power Plan  

E-Print Network (OSTI)

Coordination Council EMM region ECP Electricity Capacity Planning submodule of NEMS EERE Energy Efficiency of EERE RA Rocky Mountain, Arizona, New Mexico, Southern Nevada EMM region RON rest of NEMS SERC, the Department of Energy's (DOE) Energy Efficiency and Renewable Energy (EERE) Program supports many potentially

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Microsoft Word - arkansas.doc  

U.S. Energy Information Administration (EIA) Indexed Site

Arkansas Arkansas NERC Region(s) ....................................................................................................... SERC/SPP Primary Energy Source........................................................................................... Coal Net Summer Capacity (megawatts) ....................................................................... 15,981 25 Electric Utilities ...................................................................................................... 11,488 23 Independent Power Producers & Combined Heat and Power ................................ 4,493 24 Net Generation (megawatthours) ........................................................................... 61,000,185 25

462

Notification of Planned 230kV Outage at Potomac River Generating Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

463

AP-2-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

464

NC-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia Power/CP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Carolina Power & Light Company (hereinafter called CP&L), and billed pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale of power

465

VA-4-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download VA-4-B Rate Schedule More Documents & Publications

466

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Out of Time and Out of Time and Comments of PEPCO Holdings, INC. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene Out of Time and Comments of PEPCO Holdings, INC. Pepco Holdings, Inc. ("PHI"), on its own behalf and on behalf of its affiliates Potomac Electric Power Company ("Pepco"), Atlantic City Electric Company ("Atlantic City"), and Delmarva Power & Light Company ("Delmarva") (collectively, the "PHI Companies"), respectfully submits this petition to intervene out of time and comments in support of the March 25, 2011 filing by PJM Interconnection, L.L.C. ("PJM") in the above-captioned proceeding. PETITION TO INTERVENE OUT OF TIME AND COMMENTS OF PEPCO HOLDINGS, INC.

467

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B 2-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company. Nothing in this

468

AP-4-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download AP-4-B Rate Schedule More Documents & Publications

469

Re: Potomac River Generating Station Department of Energy Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PEPCO is providing you with information regarding the planned PEPCO is providing you with information regarding the planned transmission maintenance outage Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: PEPCO is providing you with information regarding the planned transmission maintenance outage Docket No. EO-05-01. Order No. 202-07-02: Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage scheduled for the upcoming weekend. Pepco notes that the scheduled maintenance activities are not associated with its new transmission line installation, but are routine maintenance activities resulting from a switch problem identified during

470

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 19470 of 28,905 results. 61 - 19470 of 28,905 results. Download Response by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 http://energy.gov/oe/downloads/response-pjm-letters-city-alexandria-and-virginia-department-environmental-quality Download Nanomaterial Laboratory Safety, Boise State University A nanomaterial, as defined by The ASTM Committee on Nanotechnology, is a particle withlengths in 2 or 3 dimensions between 1 to 100 nm that mayor may not have a size related intensive property.... http://energy.gov/nepa/downloads/nanomaterial-laboratory-safety-boise-state-university Download PIA- Management and Administration (MA) The E-Government Act of 2002 requires Federal agencies to perform Privacy

471

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 5150 of 9,640 results. 41 - 5150 of 9,640 results. Download EIS-0361: Final Environmental Impact Statement Western Greenbrier Co-Production Demonstration Project http://energy.gov/nepa/downloads/eis-0361-final-environmental-impact-statement Download Microsoft PowerPoint- DOE O 413 3B Brief v9 with key points in notes [Read-Only] http://energy.gov/management/downloads/microsoft-powerpoint-doe-o-413-3b-brief-v9-key-points-notes-read-only Download A:REPORT96.PDF http://energy.gov/management/downloads/areport96pdf Download B:REPORT97.PDF http://energy.gov/management/downloads/breport97pdf Download PJM Presentation- The Silver Bullet: Storage! (July 12, 2011) Presentation by Terry Boston, President and CEO pf PJM Interconnection before the Electricity Advisorty Committee, July 12, 2011, on storage for

472

AP-3-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B Wholesale Power Rate Schedule 3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download

473

Technical Conference on the Criteria for Designation of NIETCs: Web Cast Final Attendee List  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEB CAST FINAL ATTENDEE LIST WEB CAST FINAL ATTENDEE LIST Ram Adapa EPRI Email: radapa@epri.com Rahul Advani Energy Capital Partners Email: radvani@ecpartners.com Syed Ahmad FERC Email: Syed.Ahmad@ferc.gov John Ahr Allegheny Power Email: jahr@alleghenypower.com Lauren Andersen PJM Email: andersen@pjm.com Grace Anderson California Energy Commission Email: grace_anderson@energy.state.ca.us Christy Appleby PA Office of Consumer Advocate Email: cappleby@paoca.org Paul Bautista Discovery Insights LLC Email: paul.bautista@comcast.net Alan Bax MO Public Service Commission Email: alan.bax@psc.mo.gov David Beam North Carolina Electric Membership Corporation Email: david.beam@ncemcs.com Joel Bearden Cargill Power Markets, LLC Email: joel_bearden@cargill.com Candace Beery

474

Ex Parte Communication - Docket EERE-2012-BT-STD-0022 | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

- Docket EERE-2012-BT-STD-0022 - Docket EERE-2012-BT-STD-0022 Ex Parte Communication - Docket EERE-2012-BT-STD-0022 On September 5, 2012, representatives from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, and the Steffes Corporation (together, "Joint Commenters") met with members of the Department of Energy ("Department") to discuss the request for information "[...] Energy Conservation Standards for Residential Water Heaters" and the comments filed therein. DOE_EnergyEfficiencyStandardsForLargeVolumeWaterHeaters.pdf More Documents & Publications Ex Parte Communication, Docket EERE-2012-BT-STD-0022 Ex Parte Communication, Docket EERE-2012-BT-STD-0022 PJM Presentation - The Silver Bullet: Storage! (July 12, 2011)

475

Microsoft Word - 112706 Final Outage Letter PUBLIC.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRITICAL ENERGY INFRASTRUCTURE INFORMATION CRITICAL ENERGY INFRASTRUCTURE INFORMATION REMOVED FOR PRIVILEGED TREATMENT November 27, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission outages that are scheduled for the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the captioned proceeding, Order No. 202-05-03 ("December 20 Order"), Pepco will provide

476

_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

955 Jefferson Ave. 955 Jefferson Ave. Valley Forge Corporate Center Norristown, PA 19403-2497 April 19, 2013 Scott Baker Sr. Business Solutions Analyst Bakers1@pjm.com (610) 666-2235 VIA EMAIL U.S. Department of Energy Email: expartecommunications@hq.doe.gov RE: Ex Parte Communication, Docket EERE-2012-BT-STD-0022 To whom it may concern, On April 19, 2013, representatives from PJM Interconnection LLC and the National Rural Electric Cooperatives Association held a phone call with members of the Department of Energy's General Counsel and Building Technologies offices to discuss legal and procedural questions related to the docket referenced pertaining to residential electric storage water heaters. The purpose of this meeting was to gain clarity on the statutory authorities the

477

Fuel Mix and Emissions Disclosure | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Emissions Disclosure and Emissions Disclosure Fuel Mix and Emissions Disclosure < Back Eligibility Utility Program Info State District of Columbia Program Type Generation Disclosure Provider DC Public Service Commission Under regulations adopted by the D.C. Public Service Commission, all electricity suppliers and electricity companies operating in the District of Columbia must report to the Commission every six months the fuel mix of electricity sold and the emissions produced. The fuel mix report must be in a format similar to the information provided by the PJM Environmental Information Services (PJM EIS). Electricity suppliers and electricity companies must also provide a fuel mix report to customers twice annually, within the June and December billing cycles. Emissions information must be disclosed every six months on

478

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B 4-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). The Customer has chosen to self- schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.

479

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA-1-B VA-1-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow

480

AP-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-B Wholesale Power Rate Schedule 1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.

Note: This page contains sample records for the topic "miso pjm serc" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

VA-2-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

482

DOE Exhibit D 2-16-06.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 / 06 16 / 06 2 Sun Mon Tue Wed Thu Fri Sat 1 Units # 1 & 4 on, with trona 2 3 4 Unit # 4 off for boiler leak 5 Units # 1 on, with trona Another base load unit will be added with trona as soon as repairs are made and model results completed 6 . 7 8 9 Unit #4 with #1 on with trona except when not dispatched by PJM 10 11 12 Units #1 & #4 on with trona except when not dispatched by PJM 13 14 15 16 17 18 19 Units # 1 & base unit on, with trona 20 21 22 23 24 25 26 Units # 1, & base unit on, with trona 27 28 Multi unit operation will be at all times in NAAQS compliance by controlling the total emissions (some combination of coal sulfur and/or trona injection) and unit load profile March and beyond

483

Final Report - Gas Retention and Release Tests Supporting the Concentrate Receipt Vessel (CRV-VSL-00002A/2B) Configuration  

DOE Green Energy (OSTI)

Gas Retention and Release (GR and R) tests were performed in the scaled Concentrate Receipt Vessel (CRV) Test Stand at the Savannah River National Laboratory to validate the capability of candidate Hybrid-Mixing systems for the CRV to safely release hydrogen during normal and upset conditions. Hydrogen is generated in the radioactive waste as a result of natural and plant processes and must not be allowed to accumulate above flammability limits. Two types of tests were conducted. Gas holdup tests determined the steady state amount of gas accumulated in the simulant under normal PJM only or PJM plus sparging conditions. Gas release tests determined what operating conditions are necessary to fully release gas after a steady state gas fraction of 4 per cent tank volume or more was reached in the simulant.

GUERRERO, HECTOR

2004-09-01T23:59:59.000Z

484

Market structure and competition: a cross-market analysis of U.S. electricity deregulation, CSEM Working Paper No  

E-Print Network (OSTI)

This paper examines the importance of market characteristics in restructured electricity markets. We measure market performance relative to benchmarks that abstract away from market design characteristics but capture important structural elements. Specifically, we estimate market outcomes under an assumption of perfect competition and under an assumption of Cournot competition in three U.S. markets: California, New England, and PJM. These two counter-factual assumptions bound the space of possible static, non-cooperative outcomes. By establishing where actual market outcomes fall within these bounds, we can compare how markets perform relative to the extremes determined by structural factors alone. Our findings suggest that vertical arrangements between suppliers and retailers, dramatically affect estimated market outcomes. When we include vertical arrangements in firms ’ objective functions, Cournot equilibrium prices in both PJM and New England fall dramatically. California did not have such arrangements. After accounting for vertical arrangements, performance in each market relative to Cournot is similar, particularly during hours of peak demand.

James Bushnell; Erin T. Mansur; Celeste Saravia; James Bushnell; Erin T. Mansur; Celeste Saravia; Steve Puller; Peter Schott; Frank Wolak

2004-01-01T23:59:59.000Z

485

Docket No. ER12--000, Request to Recover Prudently-Incurred Costs Associated with  

E-Print Network (OSTI)

Dear Secretary Bose: Pursuant to Section 205 of the Federal Power Act (FPA) 1 and Part 35 of the regulations of the Federal Energy Regulatory Commission (Commission), 2 Public Service Electric and Gas Company (PSE&G) hereby submits for filing revised tariff sheets to the Open Access Transmission Tariff (OATT) administered by PJM Interconnection, L.L.C. (PJM) modifying PSE&G’s existing cost-of-service formula rate (Formula Rate) to permit the recovery of prudently incurred costs associated with the abandonment of the Branchburg-Roseland-Hudson 500 kilovolt (kV) project (BRH Project or the Project). PSE&G respectfully requests that the Commission permit the revised tariff sheets to become effective in sixty (60) days (i.e., September 17, 2012) with no suspension period or hearing. 1

Law Department; Honorable Kimberly; D. Bose

2012-01-01T23:59:59.000Z

486

Data:9cbd1d7d-e255-47ce-8bbb-b832b38331af | Open Energy Information  

Open Energy Info (EERE)

cbd1d7d-e255-47ce-8bbb-b832b38331af cbd1d7d-e255-47ce-8bbb-b832b38331af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: DR - Miso Demand Response Rider Sector: Description: AVAILABILITY This Rider shall be available throughout Company's Service Area. Company reserves the right to limit total MW participation in this Rider as set forth in the applicable Midwest Independent System Operator (MISO) Business Practices Manuals (BPM) or as required by Company. This Rider is effective on and after July 1, 2011.

487

CERTS 2012 Program Review - Automatic Reliability Reports (ARR) Research & Implementation - Carlos Martinez, ASR Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability Reports (ARR) Reliability Reports (ARR) Grid Reliability Performance Metrics Using Model-Less Algorithms Prototype Development and Field Demonstration at MISO Carlos Martinez - Advanced Systems Researchers (ASR) June 12-13, 2012 Washington, D.C. FY12 DOE/NETL Transmission Reliability R&D Internal Program Review Page 0 Presentation Outline  Automatic Reliability Reports (ARR) Background  Grid Reliability Metrics Prototype Objectives  Technical Accomplishments during FY2012 and Next Action Items  Risk Factors Affecting Timely Completion  Follow up Work for FY13  Overview of prototype at MISO: Architecture, Grid Monitoring Visualization and Grid Reliability Tracking Grid Automatic Reliability Report (GARR) Page 1 Automatic Reliability Reports (ARR)

488

Supplemental Reply Comments of International Transmission Company d/b/a ITC Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MISO-IESO-C02-R0 MISO-IESO-C02-R0 Page 2 of 10 2.0 DEFINITIONS Circuit Target Flow(s) - The desired power flow (MW) on a specific circuit(s) of the Interface. Control Band - The maximum targeted Interface Deviation of ± 200 MW, maintained within practical considerations. Interface Deviation - The difference between the Interface Flow and the Interface Schedule. Interface - Collectively, the four circuits that comprise the Ontario-Michigan interconnection (J5D, L4D, L51D, B3N). Interface Control Mode(s) Regulated Mode - The Interface is within operational limitations and retains the ability to maintain the Interface Deviation within the Control Band, as described in Section 3.4.1

489

Forward capacity market CONEfusion  

Science Conference Proceedings (OSTI)

In ISO New England and PJM it was assumed that sponsors of new capacity projects would offer them into the newly established forward centralized capacity markets at prices based on their levelized net cost of new entry, or ''Net CONE.'' But the FCCMs have not operated in the way their proponents had expected. To clear up the CONEfusion, FCCM designs should be reconsidered to adapt them to the changing circumstances and to be grounded in realistic expectations of market conduct. (author)

Wilson, James F.

2010-11-15T23:59:59.000Z

490

Electricity transmission: an overview of the current debate  

E-Print Network (OSTI)

, FERC, pursued the implementation of a Standard Market Design and encouraging larger Regional Transmission Organisations to facilitate efficient trade over wider areas and transmission investment. In Europe, under prompting from the European... will soon be) implemented in some variation in several states in the US (e.g. PJM, New York, New England, Texas and California) and is a cornerstone of FERC’s proposed Standard Market Design. For short-run congestion management there is agreement that a...

Brunekreeft, Gert; Neuhoff, Karsten; Newbery, David

2006-03-14T23:59:59.000Z

491

Environmental time series analysis and forecasting with the Captain toolbox  

Science Conference Proceedings (OSTI)

The Data-Based Mechanistic (DBM) modelling philosophy emphasises the importance of parametrically efficient, low order, 'dominant mode' models, as well as the development of stochastic methods and the associated statistical analysis required for their ... Keywords: DAR, DARX, DBM, DHR, DLR, DTF, Data-based mechanistic, FIS, Fixed interval smoothing, Forecasting, GRW, Hyper-parameter optimisation, IRW, IV, Identification, Kalman filtering, MISO, ML, Maximum likelihood, NVR, RIV, RW, SDP, SRIV, SRW, Signal processing, TF, TVP, UC, Unobserved components model, YIC

C. James Taylor; Diego J. Pedregal; Peter C. Young; Wlodek Tych

2007-06-01T23:59:59.000Z

492

Coordination of Retail Demand Response with Midwest ISO Markets  

SciTech Connect

The Organization of Midwest ISO States (OMS) launched the Midwest Demand Resource Initiative (MWDRI) in 2007 to identify barriers to deploying demand response (DR) resources in the Midwest Independent System Operator (MISO) region and develop policies to overcome them. The MWDRI stakeholders decided that a useful initial activity would be to develop more detailed information on existing retail DR programs and dynamic pricing tariffs, program rules, and utility operating practices. This additional detail could then be used to assess any"seams issues" affecting coordination and integration of retail DR resources with MISO's wholesale markets. Working with state regulatory agencies, we conducted a detailed survey of existing DR programs, dynamic pricing tariffs, and their features in MISO states. Utilities were asked to provide information on advance notice requirements to customers, operational triggers used to call events (e.g. system emergencies, market conditions, local emergencies), use of these DR resources to meet planning reserves requirements, DR resource availability (e.g., seasonal, annual), participant incentive structures, and monitoring and verification (M&V) protocols. This report describes the results of this comprehensive survey and discusses policy implications for integrating legacy retail DR programs and dynamic pricing tariffs into organized wholesale markets. Survey responses from 37 MISO members and 4 non-members provided information on 141 DR programs and dynamic pricing tariffs with a peak load reduction potential of 4,727 MW of retail DR resource. Major findings of this study area:- About 72percent of available DR is from interruptible rate tariffs offered to large commercial and industrial customers, while direct load control (DLC) programs account for ~;;18percent. Almost 90percent of the DR resources included in this survey are provided by investor-owned utilities. - Approximately, 90percent of the DR resources are available with less than two hours advance notice and over 1,900 MW can be dispatched on less than thirty minutes notice. These legacy DR programs are increasingly used by utilities for economic in addition to reliability purposes, with over two-thirds (68percent) of these programs callable based on market conditions. - Approximately 60percent of DLC programs and 30percent of interruptible rate programs called ten or more DR events in 2006. Despite the high frequency of DR events, customer complaints remained low. The use of economic criteria to trigger DR events and the flexibility to trigger a large number of events suggests that DR resources can help improve the efficiency of MISO wholesale markets. - Most legacy DR programs offered a reservation payment ($/kW) for participation; incentive payment levels averaged about $5/kW-month for interruptible rate tariffs and $6/kW-month for DLC programs. Few programs offered incentive payments that were explicitly linked to actual load reductions during events and at least 27 DR programs do not have penalties for non-performance. - Measurement and verification (M&V) protocols to estimate load impacts vary significantly across MISO states. Almost half of the DR programs have not been evaluated in recent times and thus performance data for DR events is not available. For many DLC programs, M&V protocols may need to be enhancedin order to allow participation in MISO's proposed EDR schedule. System operators and planners will need to develop more accurate estimates of the load reduced capability and actual performance.

Bharvirkar, Ranjit; Bharvirkar, Ranjit; Goldman, Charles; Heffner, Grayson; Sedano, Richard

2008-05-27T23:59:59.000Z

493

Town of Selma, North Carolina (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Selma Selma Place North Carolina Utility Id 16914 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes ISO Other Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 100 W Sodium Vapor/ Semi-enclosed Lighting AREA LIGHTING - 22,000 Lumen Sodium Vapor Lighting AREA LIGHTING - 250 Watt HPS Lighting AREA LIGHTING - 250 Watt HPS with decorative pole Lighting AREA LIGHTING - 27,500 Lumen Sodium Vapor Colbra-head Lighting AREA LIGHTING - 27,500 Lumen Sodium Vapor Flood Lighting AREA LIGHTING - 400 Watt HPS with decorative pole Lighting

494

Sac-Osage Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Sac-Osage Electric Coop Inc Sac-Osage Electric Coop Inc Jump to: navigation, search Name Sac-Osage Electric Coop Inc Place Missouri Utility Id 16511 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Multi-Phase (Under 75 kW) Commercial Commercial Single-Phase (Under 75 kW) Commercial Irrigation Rate Commercial Non-Commercial (Under 75 kW) Non-Commercial Time of Use Rate Residential Residential Residential Seasonal Residential Three Phase Service (Over 75 kW) Industrial Average Rates Residential: $0.1110/kWh

495

Chickasaw Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Chickasaw Electric Coop, Inc Chickasaw Electric Coop, Inc Jump to: navigation, search Name Chickasaw Electric Coop, Inc Place Tennessee Utility Id 40166 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial GSA 3-Rate 54, 55,59 Commercial Commercial GSA-Rate 40,49 Commercial Commercial GSA-Rate 48 Commercial Commercial GSA2-RATES 50,57 Commercial Commercial GSA2-RATES 51 Commercial Commercial TOU TGSA 1 Commercial Commercial TOU TGSA 2 Commercial Industrial GSA 3-Rate 54, 55,59 Industrial Industrial GSA-Rate 40,49 Industrial

496

Southern Iowa Elec Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

Iowa Elec Coop, Inc Iowa Elec Coop, Inc Place Iowa Utility Id 17643 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes ISO Other Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Residentail Rate Residential Security Light Metered Lighting Security Light Non-Metered Lighting Average Rates Residential: $0.1300/kWh Commercial: $0.0905/kWh Industrial: $0.0723/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Southern_Iowa_Elec_Coop,_Inc&oldid=411570

497

HICC | OpenEI  

Open Energy Info (EERE)

HICC HICC Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

498

City of Tuscumbia, Alabama (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Tuscumbia, Alabama (Utility Company) Tuscumbia, Alabama (Utility Company) Jump to: navigation, search Name City of Tuscumbia Place Alabama Utility Id 19307 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Power ( 50 kw or more) Commercial General Power ( demand 1000 kw or more) Commercial General Power(50 kw or less) Commercial Outdoor Lighting (1000) Lighting Outdoor Lighting (175 MV) Lighting Outdoor Lighting (250 HPS) Lighting Outdoor Lighting (400 MV) Lighting Outside Lights(100 HPS) Lighting Residential Rate Residential

499

Edgecombe-Martin County E M C | Open Energy Information  

Open Energy Info (EERE)

Edgecombe-Martin County E M C Edgecombe-Martin County E M C Jump to: navigation, search Name Edgecombe-Martin County E M C Place North Carolina Utility Id 5656 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png GENERAL SERVICE Single Phase Commercial GENERAL SERVICE Single Phase(Small Renewable Generation Rider) Commercial GENERAL SERVICE Three Phase Commercial GENERAL SERVICE Three Phase( with Small Renewable Generation Rider) Commercial LARGE POWER SERVICE Industrial LARGE POWER SERVICE(Standard Primary Voltage) Industrial

500

EPB | Open Energy Information  

Open Energy Info (EERE)

EPB EPB Jump to: navigation, search Logo: EBP Name EBP Address 10 West M.L. King Blvd. Place Chattanooga, TN Zip 37422 Service Territory Georgia, Tennessee Website www.epb.net Green Button Reference Page www.epb.net/news/news-arc Green Button Committed Yes Utility Id 3408 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! EPB is a community owned company in Chattanooga that provides utility electric and communication services to the greater Chattanooga area. Rate Information City_of_Chattanooga,_Tennessee_(Utility_Company) City_of_Chattanooga,_Georgia_(Utility_Company)