National Library of Energy BETA

Sample records for minimum acceptable bid

  1. DOE Does Not Accept Initial SPR Bids | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initial SPR Bids DOE Does Not Accept Initial SPR Bids April 4, 2007 - 12:17pm Addthis WASHINGTON, DC - The U.S. Department of Energy's Office of Fossil Energy today said that it had reviewed, and deemed unacceptable, the bids that it had received in response to a solicitation to purchase up to four million barrels of crude oil for the Strategic Petroleum Reserve (SPR). The Office of Fossil Energy determined that the bids were too high and not a reasonable value for taxpayers. In keeping with

  2. DOE Accepts Bids for Northeast Home Heating Oil Stocks | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Accepts Bids for Northeast Home Heating Oil Stocks DOE Accepts Bids for Northeast Home Heating Oil Stocks February 3, 2011 - 12:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) today has awarded contracts to three companies who successfully bid for the purchase of 984,253 barrels of heating oil from the Northeast Home Heating Oil Reserve. Awardee Amount Morgan Stanley 500,000 barrels Shell Trading U.S. Company 250,000 barrels George E. Warren Corporation 234,253

  3. DOE Does Not Accept SPR Bids and Suspends Plans for Future Purchases |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SPR Bids and Suspends Plans for Future Purchases DOE Does Not Accept SPR Bids and Suspends Plans for Future Purchases May 2, 2007 - 12:45pm Addthis WASHINGTON, DC - The U.S. Department of Energy's Office of Fossil Energy has rejected all offers received from the second solicitation issued this spring that sought to purchase up to four million barrels of crude oil for the United States' crude oil reserve. Both solicitations resulted in no awards because the Department

  4. Generator Bidding Strategies in a Competitive Electricity Market with Derating and Bid-Segment Considerations

    SciTech Connect (OSTI)

    Lu, Ning; Chow, Joe H.; Desrochers, Alan A.

    2009-07-31

    This paper develops optimal generator bidding strategies in a competitive electricity market. Starting from a generators cost curve, basic bidding concepts such as the break-even bid curve and the maximum profit bid curve can be readily derived. The maximum profit bid curve can be extended to account for generator availability and derating. In addition, multiple-segment block energy bids can be optimized based on the maximum profit curve and the probabilistic distribution of market clearing prices.

  5. Sealed Bids | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sealed Bids Sealed Bids Consolidated Nuclear Security, L.L.C., acting on behalf of the National Nuclear Security Administration (NNSA)/U.S. Department of Energy (DOE), under Government Contract DE-AC05-00OR22800, from time to time solicits sealed bids for the purchase of government-owned used and unused industrial equipment items as further described on Schedule A of the posted Sale of Government-Owned Property Bid and Award document. Bidding opportunities are posted on this website as they

  6. Revenue adequate bidding strategies in competitive electricity markets

    SciTech Connect (OSTI)

    Li, C.; Svoboda, A.J.; Guan, X.; Singh, H.

    1999-05-01

    Energy trading in a competitive electricity market can be modeled as a two-level optimization. At the top level a Centralized Economic Dispatch (CED) uses a priority list method to solve the fundamental problem of reliable market clearing with price discovery. The lower level consists of a set of Decentralized Bidding (DB) subproblems. The DB model uses a self-unit scheduling simulator based on parametric dynamic programming to produce hourly bid curves for the central dispatch coordinator. Unit operating constraints and costs such as the unit minimum-up and minimum-down times, ramp rates, and the unit start-up, no-load and sunk capital costs are internalized in the bid curves through the simulator. A special algorithm is presented to solve the revenue adequacy problem for marginal units. Both CED and DB models are based on the revenue maximization in contrast with the cost minimization criteria used in the conventional Unit Commitment (UC). The proposed method has been tested in a study case and some interesting results have been demonstrated.

  7. Competitive bidding might create antitrust problems

    SciTech Connect (OSTI)

    Smith, D.J.360

    1991-01-01

    With the increased use and complexity of competitive bidding systems for new generating capacity there is the possibility that federal antitrust laws may be violated. Anyone violating Section 1 of the Sherman Act could face stiff penalties. Falling into this category of violations are agreements among competitors, price fixing, and elimination of competitors through the allocations of customers and/or territories. It does not have to be in writing for someone to be charged with bid rigging. In fact, it is stated that bid rigging is typically proved from the testimony of one of the persons involved. According to this paper, a charge of rigging the bids can come from: One or more bidders offering to provide power at a higher price than another bidder. Two or more bidders offering to supply power at the same price. One or more potential bidders not submitting a bid or intentionally bidding high. One bidder and not the others offering a more favorable construction schedule or an alternative proposal. One firm offering to renegotiate if its bid is rejected while the other bidders refuse. These are just some of the agreements that are illegal. The penalties for such violations of the Sherman Act are severe: fines of up to $100,000 and up to three years in jail for individuals; up to $1 million in fines for corporations.

  8. ESnet Bids Farewell to Greg Bell

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bids Farewell to Greg Bell News & Publications ESnet News Media & Press Publications and Presentations Galleries ESnet Awards and Honors Contact Us Media Jon Bashor, jbashor@lbl.gov, +1 510 486 5849 or Media@es.net Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net ESnet Bids Farewell to Greg Bell February 26, 2016 Linda Vu,

  9. Review of consolidated Edison`s integrated resource bidding program

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Baldick, R.; Milne, A.

    1993-07-01

    Competitive bidding has emerged as the dominant method for procuring new resources by US utilities. In New York, the Public Service Commission (NYPSC) ordered the state`s seven investor-owned utilities to develop bidding programs to acquire supply and DSM resource options. Utilities were allowed significant discretion in program design in order to encourage experimentation. Competitive bidding programs pose formidable policy, design, and management challenges for utilities and their regulators. Yet, there have been few detailed case studies of bidding programs, particularly of those utilities that take on the additional challenge of having supply and DSM resources compete head-to-head for a designated block of capacity. To address that need, the New York State Energy Research and Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy`s Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the bidding programs of two utilities that tested the integrated ``all-sources`` approach. This study focuses primarily on Consolidated Edison Company of New York`s (Con Edison) bidding program; an earlier report discusses our review of Niagara Mohawk`s program (Goldman et al 1992). We reviewed relevant Commission decisions, utility filings and signed contracts, interviewed utility and regulatory staff, surveyed DSM bidders and a selected sample of DSM non-bidders, and analyzed the bid evaluation system used in ranking bids based on detailed scoring information on individual bids provided by Con Edison.

  10. Geothermal Lease Sale in Nevada Yields Record Bids

    Broader source: Energy.gov [DOE]

    The U.S. Department of the Interior (DOI) has received a record $28.2 million in bids for geothermal energy development on federal public lands in Nevada.

  11. Northeast Home Heating Oil Reserve- Online Bidding System

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy has developed an on-line bidding system - an anonymous auction program - for the sale of product from the one million barrel Northeast Home Heating Oil Reserve.

  12. Review of integrated resource bidding at Niagara Mohawk

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Stoft, S.S.; Cohen, S.

    1992-05-01

    In June 1988, the New York Public Service Commission (PSC) ordered the state's investor-owned utilities to develop competitive bidding programs that included both supply and demandside resource options. The New York State Energy Research Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy's Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the integrated bidding processes of two New York utilities, Niagara Mohawk and Consolidated Edison. This interim report focuses on Niagara Mohawk (NMPC). In terms of overall approach, our analysis is intended as a critical review of a large-scale experiment in competitive resource acquisition implemented by New York utilities at the direction of their state regulators. The study is not a formal impact or process evaluation. Based on priorities established jointly with project sponsors, the report focuses on selected topics: analysis of the two-stage scoring system used by NMPC, ways that the scoring system can be improved, an in-depth review of the DSM bidding component of the solicitation including surveys of DSM bidders, relationship between DSM bidding and other utility-sponsored DSM programs, and major policy issues that arise in the design and implementation of competitive resource procurements. The major findings of this report are: NMPC's solicitation elicited an impressive response from private power developers and energy service companies. In the initial ranking of bids, DSM projects were awarded significantly more points on price and environmental factors compared to supply-side bids. NMPC's scoring system gave approximately twice as much weight nominally to price as to non-price factors (850 vs. 460 points).

  13. Review of integrated resource bidding at Niagara Mohawk

    SciTech Connect (OSTI)

    Goldman, C.A.; Busch, J.F.; Kahn, E.P.; Stoft, S.S.; Cohen, S.

    1992-05-01

    In June 1988, the New York Public Service Commission (PSC) ordered the state`s investor-owned utilities to develop competitive bidding programs that included both supply and demandside resource options. The New York State Energy Research & Development Authority (NYSERDA), the New York Department of Public Service, and the Department of Energy`s Integrated Resource Planning program asked Lawrence Berkeley Laboratory (LBL) to review the integrated bidding processes of two New York utilities, Niagara Mohawk and Consolidated Edison. This interim report focuses on Niagara Mohawk (NMPC). In terms of overall approach, our analysis is intended as a critical review of a large-scale experiment in competitive resource acquisition implemented by New York utilities at the direction of their state regulators. The study is not a formal impact or process evaluation. Based on priorities established jointly with project sponsors, the report focuses on selected topics: analysis of the two-stage scoring system used by NMPC, ways that the scoring system can be improved, an in-depth review of the DSM bidding component of the solicitation including surveys of DSM bidders, relationship between DSM bidding and other utility-sponsored DSM programs, and major policy issues that arise in the design and implementation of competitive resource procurements. The major findings of this report are: NMPC`s solicitation elicited an impressive response from private power developers and energy service companies. In the initial ranking of bids, DSM projects were awarded significantly more points on price and environmental factors compared to supply-side bids. NMPC`s scoring system gave approximately twice as much weight nominally to price as to non-price factors (850 vs. 460 points).

  14. Texas GLO Oil and Gas Sealed Bid Forms | Open Energy Information

    Open Energy Info (EERE)

    Oil and Gas Sealed Bid Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Texas GLO Oil and Gas Sealed Bid FormsLegal Abstract The...

  15. Acceptance Criteria - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G and I clarified requirements throughout the appendices. Appendix I, Table I-1 in the Waste Acceptance Criteria for the "Payload Container Description" removed "208-L (55 gal)...

  16. TPO's Acceptance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TECHNICAL PROJECT OFFICER'S ACCEPTANCE REPORT DATE OF REQUEST: AWARD NUMBER: DE- AWARD PERIOD FROM: TO: NAME OF AWARDEE: PROJECT TITLE: OVERALL RATING OF AWARDEE'S PERFORMANCE ...

  17. Portland General Electic RFP--deadline for intent to bid September...

    Open Energy Info (EERE)

    Member 28 August, 2013 - 15:09 Portland General Electric has issued an RFP for marketing and supply for its voluntary renewable energy program. Bidders may bid on the...

  18. The Benefits and Risks of Virtual Bidding in Multi-Settlement Markets

    SciTech Connect (OSTI)

    Isemonger, Alan G.

    2006-11-15

    While it is possible that multi-settlement markets can exist without virtual trading, it is equally clear that virtual trading can provide many market benefits. The main one: In the absence of explicit virtual bidding (EVB), the price arbitrage trades that are benign in other commodity markets affect the reliability of the underlying electricity markets, resulting in a situation where EVB is most useful when it neutralizes the deleterious reliability effects of implicit virtual bidding and physical arbitrage. (author)

  19. Meeting the Northwest's Energy Needs Through Competitive Bidding.

    SciTech Connect (OSTI)

    McCoy, Gilbert A.; Bloomquist, R. Gordon

    1990-07-01

    Utilities have traditionally met load growth requirements through building projects (self-build), purchasing power from other utilities, or from running conservation programs. During the 1980s, alternative capacity expansion approaches were developed. Resources are now also obtained through PURPA-based or competitive bidding acquisition programs. Self-build programs typically involve large-scale hydropower; coal-, natural gas-, and oil-fired projects; and nuclear thermal electric generating projects. Characteristics of these projects, in addition to size, include long lead times, capital intensiveness, substantial environmental impacts, and a significant risk of cost overruns. The risk element became immediately apparent to those investor-owned utilities that, because of decreased load growth, had thermal project investments disallowed in rate cases or were forced to terminate projects. Phrases such as prudent investment,'' used and useful,'' and least-cost planning'' became familiar to the utility industry. Many utilities, once burned, subsequently adopted a policy of never again constructing a base-loaded generating plant. 2 figs.

  20. Aussie LNG players target NE Asia in expansion bid

    SciTech Connect (OSTI)

    Not Available

    1994-02-28

    Australia's natural gas players, keen to increase their presence in world liquefied natural gas trade, see Asia as their major LNG market in the decades to come. That's despite the fact that two spot cargoes of Australian Northwest Shelf LNG were shipped to Europe during the last 12 months and more are likely in 1994. Opportunities for growth are foreseen within the confines of the existing Northwest Shelf gas project for the rest of the 1990s. But the main focus for potential new grassroots project developers and expansions of the existing LNG plant in Australia is the expected shortfall in contract volumes of LNG to Japan, South Korea, and Taiwan during 2000--2010. Traditionally the price of crude oil has been used as a basis for calculating LNG prices. This means the economics of any new 21st century supply arrangements are delicately poised because of the current low world oil prices, a trend the market believes is likely to continue. In a bid to lessen the effect of high initial capital outlays and still meet projected demand using LNG from new projects and expansion of the existing plant, Australia's gas producers are working toward greater cooperation with prospective Asian buyers.

  1. Program Evaluation: Minimum EERE Requirements

    Broader source: Energy.gov [DOE]

    The minimum requirements for EERE's in-progress peer reviews are described below. Given the diversity of EERE programs and activities, a great deal of flexibility is provided within these...

  2. Courts and commissions: Does bidding save money in a buyer's market

    SciTech Connect (OSTI)

    Cross, P.S.

    1994-04-01

    With stable fuel prices and slow growth in demand, a buyer's market reigns in some places for electricity. Surprisingly, state regulators are struggling to bring the benefits to ratepayers. Some are saying that structured competitive-bidding programs and [open quotes]Request for Proposal[close quotes] (RFP) procedures are standing in the way. Mandatory competitive-bidding programs for electric utility procurement of purchased power are a regulatory fixture in many states. Regulators often cite two major goals in support of such programs: (1) to encourage utilities to seek the cheapest power to meet customer demand as a part of broader least-cost planning rules, and (2) to foster development of the nonutility generator (NUG) industry (often with special emphasis on facilities that use renewable resources) by providing a consistent and secure market for NUG power. But regulators from Massachusetts to California are finding that the two goals can conflict, especially where there is plenty of inexpensive supply on the short-term market. The strict bidding schemes for purchased power sometimes prevent a utility from fully exploiting lower-cost supplies once the bidding is complete.

  3. Learning Based Bidding Strategy for HVAC Systems in Double Auction Retail Energy Markets

    SciTech Connect (OSTI)

    Sun, Yannan; Somani, Abhishek; Carroll, Thomas E.

    2015-07-01

    In this paper, a bidding strategy is proposed using reinforcement learning for HVAC systems in a double auction market. The bidding strategy does not require a specific model-based representation of behavior, i.e., a functional form to translate indoor house temperatures into bid prices. The results from reinforcement learning based approach are compared with the HVAC bidding approach used in the AEP gridSMART® smart grid demonstration project and it is shown that the model-free (learning based) approach tracks well the results from the model-based behavior. Successful use of model-free approaches to represent device-level economic behavior may help develop similar approaches to represent behavior of more complex devices or groups of diverse devices, such as in a building. Distributed control requires an understanding of decision making processes of intelligent agents so that appropriate mechanisms may be developed to control and coordinate their responses, and model-free approaches to represent behavior will be extremely useful in that quest.

  4. Automation of Capacity Bidding with an Aggregator Using Open Automated Demand Response

    SciTech Connect (OSTI)

    Kiliccote, Sila; Piette, Mary Ann

    2008-10-01

    This report summarizes San Diego Gas& Electric Company?s collaboration with the Demand Response Research Center to develop and test automation capability for the Capacity Bidding Program in 2007. The report describes the Open Automated Demand Response architecture, summarizes the history of technology development and pilot studies. It also outlines the Capacity Bidding Program and technology being used by an aggregator that participated in this demand response program. Due to delays, the program was not fully operational for summer 2007. However, a test event on October 3, 2007, showed that the project successfully achieved the objective to develop and demonstrate how an open, Web?based interoperable automated notification system for capacity bidding can be used by aggregators for demand response. The system was effective in initiating a fully automated demand response shed at the aggregated sites. This project also demonstrated how aggregators can integrate their demand response automation systems with San Diego Gas& Electric Company?s Demand Response Automation Server and capacity bidding program.

  5. GMTI radar minimum detectable velocity.

    SciTech Connect (OSTI)

    Richards, John Alfred

    2011-04-01

    Minimum detectable velocity (MDV) is a fundamental consideration for the design, implementation, and exploitation of ground moving-target indication (GMTI) radar imaging modes. All single-phase-center air-to-ground radars are characterized by an MDV, or a minimum radial velocity below which motion of a discrete nonstationary target is indistinguishable from the relative motion between the platform and the ground. Targets with radial velocities less than MDV are typically overwhelmed by endoclutter ground returns, and are thus not generally detectable. Targets with radial velocities greater than MDV typically produce distinct returns falling outside of the endoclutter ground returns, and are thus generally discernible using straightforward detection algorithms. This document provides a straightforward derivation of MDV for an air-to-ground single-phase-center GMTI radar operating in an arbitrary geometry.

  6. Consumers (Consumer Acceptance and Charging Infrastructure) Consumer Acceptance Group A

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CONSUMERS (CONSUMER ACCEPTANCE AND CHARGING INFRASTRUCTURE) EV Everywhere Workshop July 30, 2012 Consumer Acceptance Group A Breakout Session #1 - Brainstorm Consumer Acceptance Barriers * Building category awareness * "Butts in the seat" * \Car sharing & rental * DOE should run a pilot project with rental car & car sharing companies to subsidize initial integration of Evs into those fleets * Social media * Groupon coupons - need to use the breadth of available social media

  7. Uranium Mill Tailings Remedial Action Project (UMTRAP), Slick Rock, Colorado, Revision 1. Bid schedule, special conditions, specifications, and subcontract drawings

    SciTech Connect (OSTI)

    1995-10-01

    This volume contains: bidding requirements; terms and conditions; specifications for Division 1 -- general requirements; specifications for Division 2 -- sitework; specifications for Divisions 5 -- metals; subcontract drawings, (general, Union Carbide processing site, North Continent processing site, and Burro Canyon disposal site).

  8. EV Everywhere Consumer Acceptance and Charging Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consumer Acceptance and Public Policy Group C Breakout Report EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop: Consumer Acceptance and Public Policy Group C ...

  9. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect (OSTI)

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  10. Site acceptance test, W-030 MICON system

    SciTech Connect (OSTI)

    Hill, L.F., Westinghouse Hanford

    1996-06-10

    Monitoring and control of the W-030 ventilation upgrade is provided by a distributed control system (DCS) furnished by MICON Corporation. After shipment to the Hanford Site, the site acceptance test (SAT) for this system was conducted in a laboratory environment over a six month period, involving four distinct phases and numerous hardware and software modifications required to correct test exceptions. The final results is a system which is not fully compliant with procurement specifications but is determined to meet minimum Project W-030 safety and functional requirements. A negotiated settlement was reached with the supplier to establish a `path forward` for system implementation. This report documents the `as-run` status of the SAT. The SAT was completed in August of 1995. It was later followed by comprehensive acceptance testing of the W-030 control-logic configuration software; results are documented in WHC-SD-W030-ATR-011. Further testing is reported as part of process system startup operational testing, performed after the MICON installation.

  11. Minimum Day Time Load Calculation and Screening

    Office of Environmental Management (EM)

    ... and TOV requirements Battery storage ... Energy Planning Grid Technologies ... Planning System Planning Department Supplemental Review: 100% minimum load ...

  12. Acceptable Documents for Identity Proofing

    Broader source: Energy.gov [DOE]

    It is a requirement that the identity of a DOE Digital Identity Subscriber be verified against acceptable identity source documents. A Subscriber must appear in person and present their Federal...

  13. Cathodic protection acceptance test procedure

    SciTech Connect (OSTI)

    Nordquist, E.M.

    1994-09-02

    This acceptance test procedure is to document testing of added anodes to existing Rectifier No. 11. Anodes were added under Project W-151, Tank 101-AZ Waste Retrieval System.

  14. Bidding strategy for microgrid in day-ahead market based on hybrid stochastic/robust optimization

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Liu, Guodong; Xu, Yan; Tomsovic, Kevin

    2016-01-01

    In this paper, we propose an optimal bidding strategy in the day-ahead market of a microgrid consisting of intermittent distributed generation (DG), storage, dispatchable DG and price responsive loads. The microgrid coordinates the energy consumption or production of its components and trades electricity in both the day-ahead and real-time markets to minimize its operating cost as a single entity. The bidding problem is challenging due to a variety of uncertainties, including power output of intermittent DG, load variation, day-ahead and real-time market prices. A hybrid stochastic/robust optimization model is proposed to minimize the expected net cost, i.e., expected total costmore » of operation minus total benefit of demand. This formulation can be solved by mixed integer linear programming. The uncertain output of intermittent DG and day-ahead market price are modeled via scenarios based on forecast results, while a robust optimization is proposed to limit the unbalanced power in real-time market taking account of the uncertainty of real-time market price. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator, a battery and a responsive load show the advantage of stochastic optimization in addition to robust optimization.« less

  15. Bidding strategy for microgrid in day-ahead market based on hybrid stochastic/robust optimization

    SciTech Connect (OSTI)

    Liu, Guodong; Xu, Yan; Tomsovic, Kevin

    2016-01-01

    In this paper, we propose an optimal bidding strategy in the day-ahead market of a microgrid consisting of intermittent distributed generation (DG), storage, dispatchable DG and price responsive loads. The microgrid coordinates the energy consumption or production of its components and trades electricity in both the day-ahead and real-time markets to minimize its operating cost as a single entity. The bidding problem is challenging due to a variety of uncertainties, including power output of intermittent DG, load variation, day-ahead and real-time market prices. A hybrid stochastic/robust optimization model is proposed to minimize the expected net cost, i.e., expected total cost of operation minus total benefit of demand. This formulation can be solved by mixed integer linear programming. The uncertain output of intermittent DG and day-ahead market price are modeled via scenarios based on forecast results, while a robust optimization is proposed to limit the unbalanced power in real-time market taking account of the uncertainty of real-time market price. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator, a battery and a responsive load show the advantage of stochastic optimization in addition to robust optimization.

  16. Bidding Opportunities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL seeks to do business with qualified companies that offer value and high quality products and services. Contact Small Business Office (505) 667-4419 Email...

  17. Wind Energy Community Acceptance | Open Energy Information

    Open Energy Info (EERE)

    Wind Energy Community Acceptance Jump to: navigation, search Photo by Dennis Schroeder, NREL 21768 The following resources address community acceptance topics. Resources...

  18. Technical Position, Regarding Acceptable Methods for Assessing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regarding Acceptable Methods for Assessing and Recording Radiation Doses to Individuals Technical Position, Regarding Acceptable Methods for Assessing and Recording Radiation Doses...

  19. Central Characterization Program (CCP), Acceptable Knowledge...

    Office of Environmental Management (EM)

    , Acceptable Knowledge Summary Report for Los Alamos National Laboratory, TA-55 Mixed Transuranic Waste Streams Central Characterization Program (CCP), Acceptable Knowledge Summary...

  20. Acceptance of Smaller CHP Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Market Acceptance of Smaller CHP Systems This project developed a flexible, packaged combined heat and power (CHP) system that produces 330 kilowatts (kW) of electrical power output and 410 kW of thermal output while increasing efficiency and reducing total cost of owner- ship. Introduction Many CHP systems less than 1 megawatt (MW) use reciprocat- ing internal combustion engines. Unfortunately, reductions in the size of these engines are associated with reduced effciency and increased

  1. HEAT Loan Minimum Standards and Requirements

    Energy Savers [EERE]

    you must meet the following minimum standards listed below. * New natural gas or propane boilers must be at least 90% AFUE to be eligible. * New oil boilers must be at least...

  2. Minimum Day Time Load Calculation and Screening

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Minimum Daytime Load Calculation and Screening Page 1 of 30 Kristen Ardani, Dora Nakfuji, Anthony Hong, and Babak Enayati Page 1 of 30 [Speaker: Kristen Ardani] Cover Slide: Thank you everyone for joining us today for our DG interconnection collaborative informational webinar. Today we are going to talk about minimum day time load calculation and screening procedures and their role in the distributed PV interconnection process. We're going to hear from Babak Enayati of the Massachusetts

  3. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lowman, Idaho: Attachment 1, Specifications and design drawings, LOW; Subcontract Documents: Bid schedule, special conditions, specifications, subcontract drawings. Final design for construction, Appendix B of the Cooperative Agreement

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This volume contains subcontract documents which include: bidding requirements; terms and conditions; specifications; and subcontract drawings.

  4. Acceptance and Rejection of CSES Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accepting, Rejecting Proposals Acceptance and Rejection of CSES Proposals High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email Acceptance Final decisions on acceptance and/or rejection of all proposals are reached after each science discipline's review meeting, held right after the close of

  5. ITP Steel: Theoretical Minimum Energies to Produce Steel for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Theoretical Minimum Energies to Produce Steel for Selected Conditions, March 2000 ITP Steel: Theoretical Minimum Energies to Produce Steel for Selected Conditions, March 2000 ...

  6. Nuclear power and public acceptance

    SciTech Connect (OSTI)

    Hirschmann, H.

    1989-01-01

    Public acceptance is a decisive factor of growing importance, although economics has been and will remain the most decisive factor in ordering new nuclear capacity. Nuclear energy can make an important contribution toward preventing and reducing the greenhouse effect. Many politicians tend to base their decisions not on facts but rather on so called public opinion and consequently to overreact in particular on environmental issues. The entire debate hinges on public confidence rather than on a lack of information. There is no 100% guarantee that technical facilities will operate completely accident-free. Therefore, standards should be harmonized, plants should be operated safely and consequences of possible accidents should be limited. There needs to be some kind of early information system between countries concerning upcoming issues as a prerequisite for acting instead of reacting, because this is an essential tool in convincing the public that they can have more confidence. Technical information alone does not answer the real questions of the public. Political, technical, and economic matters as well as public opinion are interwoven and cannot be separated from each. Therefore, the exchange of experience gained in all these sectors on an international basis must be improved.

  7. Minimum Day Time Load Calculation and Screening

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Minimum Day Time Load Calculation and Screening" Dora Nakafuji and Anthony Hong, Hawaiian Electric Co. Babak Enayati, DG Techincal Standards Review Group April 30, 2014 2 Speakers Babak Enayati Chair of Massachusetts DG Technical Standards Review Group Dora Nakafuji Director of Renewable Energy Planning Hawaiian Electric Company (HECO) Kristen Ardani Solar Analyst, (today's moderator) NREL Anthony Hong Director of Distribution Planning Hawaiian Electric Company (HECO) Standardization of

  8. Two variants of minimum discarded fill ordering

    SciTech Connect (OSTI)

    D'Azevedo, E.F. ); Forsyth, P.A.; Tang, Wei-Pai . Dept. of Computer Science)

    1991-01-01

    It is well known that the ordering of the unknowns can have a significant effect on the convergence of Preconditioned Conjugate Gradient (PCG) methods. There has been considerable experimental work on the effects of ordering for regular finite difference problems. In many cases, good results have been obtained with preconditioners based on diagonal, spiral or natural row orderings. However, for finite element problems having unstructured grids or grids generated by a local refinement approach, it is difficult to define many of the orderings for more regular problems. A recently proposed Minimum Discarded Fill (MDF) ordering technique is effective in finding high quality Incomplete LU (ILU) preconditioners, especially for problems arising from unstructured finite element grids. Testing indicates this algorithm can identify a rather complicated physical structure in an anisotropic problem and orders the unknowns in the preferred'' direction. The MDF technique may be viewed as the numerical analogue of the minimum deficiency algorithm in sparse matrix technology. At any stage of the partial elimination, the MDF technique chooses the next pivot node so as to minimize the amount of discarded fill. In this work, two efficient variants of the MDF technique are explored to produce cost-effective high-order ILU preconditioners. The Threshold MDF orderings combine MDF ideas with drop tolerance techniques to identify the sparsity pattern in the ILU preconditioners. These techniques identify an ordering that encourages fast decay of the entries in the ILU factorization. The Minimum Update Matrix (MUM) ordering technique is a simplification of the MDF ordering and is closely related to the minimum degree algorithm. The MUM ordering is especially for large problems arising from Navier-Stokes problems. Some interesting pictures of the orderings are presented using a visualization tool. 22 refs., 4 figs., 7 tabs.

  9. Minimum Day Time Load Calculation and Screening

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distributed Generation Interconnection Collaborative (DGIC) "Minimum Day Time Load Calculation and Screening" Dora Nakafuji and Anthony Hong, Hawaiian Electric Co. Babak Enayati, DG Techincal Standards Review Group April 30, 2014 2 Speakers Babak Enayati Chair of Massachusetts DG Technical Standards Review Group Dora Nakafuji Director of Renewable Energy Planning Hawaiian Electric Company (HECO) Kristen Ardani Solar Analyst, (today's moderator) NREL Anthony Hong Director of

  10. FBI officer accepts LANL counterintelligence post

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL counterintelligence FBI officer accepts LANL counterintelligence post Cloyd has most ... Cloyd brings to Los Alamos 25 years of FBI experience in counterintelligence (including ...

  11. EV Everywhere Consumer Acceptance and Charging Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Breakout session presentation for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles...

  12. Nevada National Security Site Waste Acceptance Criteria

    National Nuclear Security Administration (NNSA)

    Nevada National Security Site Waste Acceptance Criteria Prepared by U.S. Department of Energy National Nuclear Security Administration Nevada Field Office Environmental...

  13. Nuclear Engineering Science Laboratory Synthesis program accepting...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Engineering Science Laboratory Synthesis program accepting applications for spring, summer 2016 Opportunity provides students with research experience at Oak Ridge National ...

  14. SAPHIRE 8 Software Acceptance Test Plan

    SciTech Connect (OSTI)

    Ted S. Wood; Curtis L. Smith

    2009-07-01

    This document describe & report the overall SAPHIRE 8 Software acceptance test paln to offically release the SAPHIRE version 8 software to the NRC custoer for distribution.

  15. EV Everywhere Consumer Acceptance and Charging Infrastructure...

    Broader source: Energy.gov (indexed) [DOE]

    Backsplash for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA...

  16. EV Everywhere ? Consumer Acceptance and Charging Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Consumer Acceptance and Charging Infrastructure Workshop David Sandalow Under Secretary of Energy (Acting) Assistant Secretary for Policy and International Affairs U.S....

  17. Part IV: Section E - Inspection and Acceptance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECTION E INSPECTION AND ACCEPTANCE DE-AC36-08GO28308 Modification M901 Section E - Page ii PART I SECTION E INSPECTION AND ACCEPTANCE TABLE OF CONTENTS E.1 FAR 52.246-9 Inspection of Research and Development (Short Form) (Apr 1984) 1 E.2 Acceptance 1 E.3 Certification 1 DE-AC36-08GO28308 Modification M901 Section E - Page 1 of 1 PART I SECTION E INSPECTION AND ACCEPTANCE E.1 FAR 52.246-9 Inspection of Research and Development (Short Form) (Apr 1984) The Government has the right to inspect and

  18. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect (OSTI)

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  19. Hanford Site Solid Waste Acceptance Criteria

    SciTech Connect (OSTI)

    Not Available

    1993-11-17

    This manual defines the Hanford Site radioactive, hazardous, and sanitary solid waste acceptance criteria. Criteria in the manual represent a guide for meeting state and federal regulations; DOE Orders; Hanford Site requirements; and other rules, regulations, guidelines, and standards as they apply to acceptance of radioactive and hazardous solid waste at the Hanford Site. It is not the intent of this manual to be all inclusive of the regulations; rather, it is intended that the manual provide the waste generator with only the requirements that waste must meet in order to be accepted at Hanford Site TSD facilities.

  20. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    SciTech Connect (OSTI)

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-07-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

  1. Approaches to acceptable risk: a critical guide

    SciTech Connect (OSTI)

    Fischhoff, B.; Lichtenstein, S.; Slovic, P.; Keeney, R.; Derby, S.

    1980-12-01

    Acceptable-risk decisions are an essential step in the management of technological hazards. In many situations, they constitute the weak (or missing) link in the management process. The absence of an adequate decision-making methodology often produces indecision, inconsistency, and dissatisfaction. The result is neither good for hazard management nor good for society. This report offers a critical analysis of the viability of various approaches as guides to acceptable-risk decisions. This report seeks to define acceptable-risk decisions and to examine some frequently proposed, but inappropriate, solutions. 255 refs., 22 figs., 25 tabs.

  2. HEAT Loan Minimum Standards and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HEAT Loan Minimum Standards and Requirements HEAT Loan Minimum Standards and Requirements Presents additional resources on loan standards and requirements from Elise Avers' presentation on HEAT Loan Minimum Standards and Requirements. Minimum Standards and Requirements (63.33 KB) More Documents & Publications Building America Best Practices Series Vol. 14: Energy Renovations - HVAC: A Guide for Contractors to Share with Homeowners STEP Financial Incentives Summary Energy Saver 101: Home

  3. DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS puzzle-693870_960_720.jpg DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS (78.26 KB) More Documents & Publications DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS: CA Authorizing Official Designated Representative (AODR)

  4. Gas characterization system software acceptance test report

    SciTech Connect (OSTI)

    Vo, C.V.

    1996-03-28

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  5. Part IV: Section E - Inspection and Acceptance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research and Development (Short Form) (Apr 1984) 1 E.2 Acceptance 1 E.3 Certification 1 ... Research and Development (Short Form) (Apr 1984) The Government has the right to inspect ...

  6. Energy Department Accepting Small Business Grant Applications...

    Energy Savers [EERE]

    November 26, 2014 - 2:55pm Addthis The Energy Department began accepting applications on November 24 for its FY 2015 Phase 1 grant topics, including a Wind Program topic, under the ...

  7. Nuclear Engineering Science Laboratory Synthesis program accepting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    applications for spring, summer 2016 Nuclear Engineering Science Laboratory Synthesis program accepting applications for spring, summer 2016 Opportunity provides students with research experience at Oak Ridge National Laboratory FOR IMMEDIATE RELEASE Nov. 11, 2015 FY16-06 OAK RIDGE, Tenn.-The Nuclear Engineering Science Laboratory Synthesis (NESLS) program is accepting applications for spring and summer 2016. NESLS is a cooperative research initiative at Oak Ridge National Laboratory (ORNL)

  8. Restrictions on Federal Employees Acceptance of Gifts

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Restrictions on Federal Employees Acceptance of Gifts As the holiday season approaches, it is important to remember there are restrictions on Federal employees accepting gifts from outside sources and from other Federal employees. Just as there is no "working lunch" exception to the gift prohibition, there is no "holiday party" exception. A gift includes anything of monetary value, including a gratuity, favor, discount, entertainment, training, transportation, lodging, and

  9. Minimum wear tube support hole design

    DOE Patents [OSTI]

    Glatthorn, Raymond H. (St. Petersburg, FL)

    1986-01-01

    A minimum-wear through-bore (16) is defined within a heat exchanger tube support plate (14) so as to have an hourglass configuration as determined by means of a constant radiused surface curvature (18) as defined by means of an external radius (R3), wherein the surface (18) extends between the upper surface (20) and lower surface (22) of the tube support plate (14). When a heat exchange tube (12) is disposed within the tube support plate (14) so as to pass through the through-bore (16), the heat exchange tube (12) is always in contact with a smoothly curved or radiused portion of the through-bore surface (16) whereby unacceptably excessive wear upon the heat exchange tube (12), as normally developed by means of sharp edges, lands, ridges, or the like conventionally part of the tube support plates, is eliminated or substantially reduced.

  10. EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop: Consumer Acceptance Group A Breakout Report

    Broader source: Energy.gov [DOE]

    Breakout session presentation for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

  11. Acceptance Priority Ranking & Annual Capacity Report

    SciTech Connect (OSTI)

    2004-07-31

    The Nuclear Waste Policy Act of 1982, as amended (the Act), assigns the Federal Government the responsibility for the disposal of spent nuclear fuel and high-level waste. Section 302(a) of the Act authorizes the Secretary to enter into contracts with the owners and generators of commercial spent nuclear fuel and/or high-level waste. The Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) established the contractual mechanism for the Department's acceptance and disposal of spent nuclear fuel and high-level waste. It includes the requirements and operational responsibilities of the parties to the Standard Contract in the areas of administrative matters, fees, terms of payment, waste acceptance criteria, and waste acceptance procedures. The Standard Contract provides for the acquisition of title to the spent nuclear fuel and/or high-level waste by the Department, its transportation to Federal facilities, and its subsequent disposal.

  12. Hanford Site solid waste acceptance criteria

    SciTech Connect (OSTI)

    Ellefson, M.D.

    1998-07-01

    Order 5820.2A requires that each treatment, storage, and/or disposal facility (referred to in this document as TSD unit) that manages low-level or transuranic waste (including mixed waste and TSCA PCB waste) maintain waste acceptance criteria. These criteria must address the various requirements to operate the TSD unit in compliance with applicable safety and environmental requirements. This document sets forth the baseline criteria for acceptance of radioactive waste at TSD units operated by WMH. The criteria for each TSD unit have been established to ensure that waste accepted can be managed in a manner that is within the operating requirements of the unit, including environmental regulations, DOE Orders, permits, technical safety requirements, waste analysis plans, performance assessments, and other applicable requirements. Acceptance criteria apply to the following TSD units: the Low-Level Burial Grounds (LLBG) including both the nonregulated portions of the LLBG and trenches 31 and 34 of the 218-W-5 Burial Ground for mixed waste disposal; Central Waste Complex (CWC); Waste Receiving and Processing Facility (WRAP); and T Plant Complex. Waste from all generators, both from the Hanford Site and from offsite facilities, must comply with these criteria. Exceptions can be granted as provided in Section 1.6. Specific waste streams could have additional requirements based on the 1901 identified TSD pathway. These requirements are communicated in the Waste Specification Records (WSRds). The Hanford Site manages nonradioactive waste through direct shipments to offsite contractors. The waste acceptance requirements of the offsite TSD facility must be met for these nonradioactive wastes. This document does not address the acceptance requirements of these offsite facilities.

  13. Albert Einstein Distinguished Educator Fellowship Program accepting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    applications for 2017-2018 Albert Einstein Distinguished Educator Fellowship Program accepting applications for 2017-2018 Deadline for applying is Nov. 17, 2016, at 8 p.m. EST FOR IMMEDIATE RELEASE August 19, 2016 FY16-44 Chad Becker, Eddy Whitson and Kevin Fritts with EPA ENERGY STAR certificate WASHINGTON, D.C.-The U.S. Department of Energy's Albert Einstein Distinguished Educator Fellowship Program is now accepting applications for 2017-2018. The program provides a unique opportunity for

  14. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  15. Minimum Efficiency Requirements Tables for Heating and Cooling Product

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Categories | Department of Energy Minimum Efficiency Requirements Tables for Heating and Cooling Product Categories Minimum Efficiency Requirements Tables for Heating and Cooling Product Categories The Federal Energy Management Program (FEMP) created tables that mirror American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 90.1-2013 tables, which include minimum efficiency requirements for FEMP-designated and ENERGY STAR-qualified heating and cooling product

  16. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    none,

    2013-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept the following: • DOE hazardous and non-hazardous non-radioactive classified waste • DOE low-level radioactive waste (LLW) • DOE mixed low-level waste (MLLW) • U.S. Department of Defense (DOD) classified waste The LLW and MLLW listed above may also be classified waste. Classified waste is the only waste accepted for disposal that may be non-radioactive and shall be required to meet the waste acceptance criteria for radioactive waste as specified in this document. Classified waste may be sent to the NNSS as classified matter. Section 3.1.18 provides the requirements that must be met for permanent burial of classified matter. The NNSA/NFO and support contractors are available to assist the generator in understanding or interpreting this document. For assistance, please call the NNSA/NFO Environmental Management Operations (EMO) at (702) 295-7063, and the call will be directed to the appropriate contact.

  17. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2012-02-28

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept DOE non-radioactive classified waste, DOE non-radioactive hazardous classified waste, DOE low-level radioactive waste (LLW), DOE mixed low-level waste (MLLW), and U.S. Department of Defense (DOD) classified waste for permanent disposal. Classified waste is the only waste accepted for disposal that may be non-radioactive and will be required to meet the waste acceptance criteria for radioactive waste as specified in this document. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project (WMP) at (702) 295-7063, and your call will be directed to the appropriate contact.

  18. Optimizing minimum free-energy crossing points in solution: Linear...

    Office of Scientific and Technical Information (OSTI)

    Optimizing minimum free-energy crossing points in solution: Linear-response free energyspin-flip density functional theory approach Citation Details In-Document Search Title:...

  19. Guidelines, Checklist, and Contract Clauses for Government Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines, Checklist, and Contract Clauses for Government Acceptance of ESPC Projects Guidelines, Checklist, and Contract Clauses for Government Acceptance of ESPC Projects ...

  20. EERE Success Story-Challenge Accepted: Reducing the Soft Costs...

    Energy Savers [EERE]

    Challenge Accepted: Reducing the Soft Costs of Going Solar EERE Success Story-Challenge Accepted: ... solar capacity, which is enough energy to power approximately 100,000 homes. ...

  1. Energy Savings with Acceptable Indoor Air Quality Through Improved...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savings with Acceptable Indoor Air Quality Through Improved Air Flow Control in Residential Retrofit Energy Savings with Acceptable Indoor Air Quality Through Improved Air Flow ...

  2. EAC Recommendations for DOE Action Regarding Consumer Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action ...

  3. Energy, Treasury Now Accepting Applications for Funding For Renewable...

    Office of Environmental Management (EM)

    Energy, Treasury Now Accepting Applications for Funding For Renewable Energy Projects Energy, Treasury Now Accepting Applications for Funding For Renewable Energy Projects July 31, ...

  4. DOE - NNSA/NFO -- EM (RWAP) Radioactive Waste Acceptance Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acceptance Program NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Click to subscribe to NNSS News Radioactive Waste Acceptance Program (RWAP) RWAP photo The mission ...

  5. Energy Department Extends Acceptance Policy for Spent Nuclear...

    National Nuclear Security Administration (NNSA)

    Energy Department Extends Acceptance Policy for Spent Nuclear Fuel from Foreign Research Reactors December 06, 2004 Energy Department Extends Acceptance Policy for Spent Nuclear ...

  6. Interim Report on Customer Acceptance, Retention, and Response...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interim Report on Customer Acceptance, Retention, and Response to Time-Based Rates from the Consumer Behavior Studies (June 2015) Interim Report on Customer Acceptance, Retention, ...

  7. Now Available: Interim Report on Customer Acceptance, Retention...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interim Report on Customer Acceptance, Retention, and Response to Time-Based Rates from the Consumer Behavior Studies Now Available: Interim Report on Customer Acceptance, ...

  8. Public Acceptability of Sustainable Transport Measures: A Review...

    Open Energy Info (EERE)

    Public Acceptability of Sustainable Transport Measures: A Review of the Literature Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Public Acceptability of Sustainable...

  9. TESTING AND ACCEPTANCE OF FUEL PLATES FOR RERTR FUEL DEVELOPMENT EXPERIMENTS

    SciTech Connect (OSTI)

    J.M. Wight; G.A. Moore; S.C. Taylor

    2008-10-01

    This paper discusses how candidate fuel plates for RERTR Fuel Development experiments are examined and tested for acceptance prior to reactor insertion. These tests include destructive and nondestructive examinations (DE and NDE). The DE includes blister annealing for dispersion fuel plates, bend testing of adjacent cladding, and microscopic examination of archive fuel plates. The NDE includes Ultrasonic (UT) scanning and radiography. UT tests include an ultrasonic scan for areas of “debonds” and a high frequency ultrasonic scan to determine the "minimum cladding" over the fuel. Radiography inspections include identifying fuel outside of the maximum fuel zone and measurements and calculations for fuel density. Details of each test are provided and acceptance criteria are defined. These tests help to provide a high level of confidence the fuel plate will perform in the reactor without a breach in the cladding.

  10. Theoretical minimum energies to produce steel for selected conditions

    SciTech Connect (OSTI)

    Fruehan, R. J.; Fortini, O.; Paxton, H. W.; Brindle, R.

    2000-03-01

    An ITP study has determined the theoretical minimum energy requirements for producing steel from ore, scrap, and direct reduced iron. Dr. Richard Fruehan's report, Theoretical Minimum Energies to Produce Steel for Selected Conditions, provides insight into the potential energy savings (and associated reductions in carbon dioxide emissions) for ironmaking, steelmaking, and rolling processes (PDF459 KB).

  11. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2011-01-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

  12. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2010-09-03

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

  13. FBI officer accepts LANL counterintelligence post

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL counterintelligence FBI officer accepts LANL counterintelligence post Cloyd has most recently served as assistant director of the Counterintelligence Division of the Federal Bureau of Investigation headquarters. November 10, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

  14. DOE/NV Radioactive Waste Acceptance Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on the Proper Characterization and Disposal of Sealed Radioactive Sources Revision 2, October 1997 Revised by: DOE/NV Radioactive Waste Acceptance Program and The NTSWAC Working Group EXECUTIVE SUMMARY The "Position Paper on the Proper Characterization and Disposal of Sealed Radioactive Sources" was originally developed by the NVO-325 Work Group, Sealed Source Waste Characterization Subgroup. The NVO-325 Workgroup, now called the NTSWAC Working Group, is comprised of representatives

  15. Los Alamos Venture Acceleration Fund accepting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Administration | (NNSA) Los Alamos Selected as Atomic Weapons Laboratory Los Alamos, NM Groves selects Los Alamos, New Mexico, as site for separate scientific laboratory to design an atomic bomb

    Funding available for New Mexico businesses February 6, 2013 Los Alamos Venture Acceleration Fund accepting 2013 applications LOS ALAMOS, NEW MEXICO, February 6, 2013-The Venture Acceleration Fund (VAF) of Los Alamos National Security, LLC (LANS), the company that manages and operates Los

  16. Call for Proposals: VAF Now Accepting Applications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2016 VAF Call for Proposals Call for Proposals: VAF Now Accepting Applications Selected companies will receive financial awards to assist in taking their innovations to market more quickly. The median award amount has averaged $45,000. March 7, 2016 VAF call for proposals The VAF is the only non-dilutive local source of seed financing for very early stage technology startups in northern New Mexico. The funding fills a unique niche in that it supports companies that lack collateral for debt

  17. Acceptance Criteria Framework for Autonomous Biological Detectors

    SciTech Connect (OSTI)

    Dzenitis, J M

    2006-12-12

    The purpose of this study was to examine a set of user acceptance criteria for autonomous biological detection systems for application in high-traffic, public facilities. The test case for the acceptance criteria was the Autonomous Pathogen Detection System (APDS) operating in high-traffic facilities in New York City (NYC). However, the acceptance criteria were designed to be generally applicable to other biological detection systems in other locations. For such detection systems, ''users'' will include local authorities (e.g., facility operators, public health officials, and law enforcement personnel) and national authorities [including personnel from the Department of Homeland Security (DHS), the BioWatch Program, the Centers for Disease Control and Prevention (CDC), and the Federal Bureau of Investigation (FBI)]. The panel members brought expertise from a broad range of backgrounds to complete this picture. The goals of this document are: (1) To serve as informal guidance for users in considering the benefits and costs of these systems. (2) To serve as informal guidance for developers in understanding the needs of users. In follow-up work, this framework will be used to systematically document the APDS for appropriateness and readiness for use in NYC.

  18. Restrictions on Federal Employees Acceptance of Gifts | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Restrictions on Federal Employees Acceptance of Gifts Restrictions on Federal Employees Acceptance of Gifts Guidance on the Acceptance of Gifts by Federal Employees Restrictions on Federal Employees Acceptance of Gifts (45.27 KB) More Documents & Publications PROCESSING INVITATIONS FOR A PRESIDENTIAL APPOINTEE Inspection Report: IG-0754 Table 10 Costs of Foreign Travel, IG-0397

  19. EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consumer Acceptance and Public Policy Group C Breakout Report | Department of Energy Consumer Acceptance and Public Policy Group C Breakout Report EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop: Consumer Acceptance and Public Policy Group C Breakout Report Breakout session presentation for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA group_c_report_out_caci.pdf

  20. Minimum Velocity Required to Transport Solid Particles from the...

    Office of Scientific and Technical Information (OSTI)

    Required to Transport Solid Particles from the 2H-Evaporator to the Tank Farm Citation Details In-Document Search Title: Minimum Velocity Required to Transport Solid Particles ...

  1. Incorporate Minimum Efficiency Requirements for Heating and Cooling...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Air-Conditioning Engineers (ASHRAE) 90.1-2013 minimum efficiency requirement tables. ... These ASHRAE 90.1-2013 Table 6.8.1-1 and Table 6.8.1-2 equipment types are excluded: ...

  2. Modeling an Application's Theoretical Minimum and Average Transactional Response Times

    SciTech Connect (OSTI)

    Paiz, Mary Rose

    2015-04-01

    The theoretical minimum transactional response time of an application serves as a ba- sis for the expected response time. The lower threshold for the minimum response time represents the minimum amount of time that the application should take to complete a transaction. Knowing the lower threshold is beneficial in detecting anomalies that are re- sults of unsuccessful transactions. On the converse, when an application's response time falls above an upper threshold, there is likely an anomaly in the application that is causing unusual performance issues in the transaction. This report explains how the non-stationary Generalized Extreme Value distribution is used to estimate the lower threshold of an ap- plication's daily minimum transactional response time. It also explains how the seasonal Autoregressive Integrated Moving Average time series model is used to estimate the upper threshold for an application's average transactional response time.

  3. Table 10.1 Nonswitchable Minimum and Maximum Consumption, 2002

    U.S. Energy Information Administration (EIA) Indexed Site

    Nonswitchable Minimum and Maximum Consumption, 2002; " " Level: National and Regional Data;" " Row: Energy Sources;" " Column: Consumption Potential;" " Unit: Physical Units." ,,,,"RSE" ,"Actual","Minimum","Maximum","Row" "Energy Sources","Consumption","Consumption(a)","Consumption(b)","Factors" ,"Total United States" "RSE Column

  4. Utility-Scale Power Tower Solar Systems: Performance Acceptance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Utility-Scale Power Tower Solar Systems: Performance Acceptance Test Guidelines David ... DE-AC36-08GO28308 Utility-Scale Power Tower Solar Systems: Performance Acceptance Test ...

  5. Applications are now being accepted for the Broader Engagement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    now being accepted for the Broader Engagement Program at SC14 May 5, 2014 by Richard Gerber Applications are now being accepted for the Broader Engagement (BE) Program at SC14,...

  6. Guidelines and Checklist for Commissioning and Government Acceptance of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ESPC ENABLE Projects | Department of Energy and Checklist for Commissioning and Government Acceptance of ESPC ENABLE Projects Guidelines and Checklist for Commissioning and Government Acceptance of ESPC ENABLE Projects Document provides guidance and a checklist to help agencies through the final steps of the ESPC ENABLE project, including project acceptance. By accepting the work of the energy service company (ESCO), the agency is confirming that the energy conservation measures have been

  7. EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grid - June 6, 2013 | Department of Energy Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid - June 6, 2013 EAC Recommendations for DOE Action Regarding Consumer Acceptance of Smart Grid, approved at the June 5-6, 2013 EAC Meeting. EAC Recommendations for DOE Action on Consumer Acceptance of Smart Grid - June 6, 2013 (338.72 KB) More Documents & Publications DOE Responses to EAC Work Products - September 2013

  8. Social Acceptance of Wind: A Brief Overview (Presentation)

    SciTech Connect (OSTI)

    Lantz, E.

    2015-01-01

    This presentation discusses concepts and trends in social acceptance of wind energy, profiles recent research findings, and discussions mitigation strategies intended to resolve wind power social acceptance challenges as informed by published research and the experiences of individuals participating in the International Energy Agencies Working Group on Social Acceptance of Wind Energy

  9. Development of the Minimum Information Specification for in situ Hybridization and Immunohistochemistry Experiments (MISFISHIE)

    SciTech Connect (OSTI)

    Deutsch, Eric W.; Ball, Catherine A.; Bova, G. Steven; Brazma, Alvis; Bumgarner, Roger E.; Campbell, David; Causton, Helen C.; Christiansen, Jeff; Davidson, Duncan; Eichner, Lillian J.; Goo, Young Ah; Grimmond, Sean; Henrich, Thorsten; Johnson, Michael H.; Korb, Martin; Mills, Jason C.; Oudes, Asa; Parkinson, Helen E.; Pascal, Laura E.; Quackenbush, John; Ramialison, Mirana; Ringwald, Martin; Sansone, Susanna A.; Sherlock, Gavin; Stoeckert, Christian Jr. J.; Swedlow, Jason; Taylor, Ronald C.; Walashek, Laura; Zhou, Yi; Liu, Alvin Y.; True, Lawrence D.

    2006-06-06

    Background One purpose of the biomedical literature is to report results in sufficient detail so that the methods of data collection and analysis can be independently replicated and verified. In order to ensure that this level of detail is provided in published works, a minimum information specification is needed for each experimental data type and for this specification to be a requirement for publication in peer-reviewed journals. This is especially beneficial for researchers working with complex data types and experiments. A data content specification has already been widely accepted by, and directly benefited, the microarray community, and efforts are well underway to develop a comparable specification for proteomics data types. However, no similar specification exists for visual interpretation-based tissue protein and transcript abundance/localization experiments (hereafter referred to as ‘gene expression localization experiments’), such as in situ hybridization and experiments involving immunohistochemistry. Results Here we present for consideration a specification, called the “Minimum Information Specification For In Situ Hybridization and Immunohistochemistry Experiments (MISFISHIE)”. It is modelled after the MIAME (Minimum Information About a Microarray Experiment) specification for microarray experiments. Data specifications like MIAME and MISFISHIE specify the information content without specifying a format for encoding that information. The MISFISHIE specification describes six types of information that should be provided for each gene expression localization experiment: Experimental Design, Biomaterials and Treatments, Reporters, Staining, Imaging Data, and Image Characterizations. A general checklist is provided for quick and easy reference and to promote adherence to the specification. We consider that most articles describing gene expression localization studies do not fully provide the minimum information needed for independent verification

  10. 2-D image segmentation using minimum spanning trees

    SciTech Connect (OSTI)

    Xu, Y.; Uberbacher, E.C.

    1995-09-01

    This paper presents a new algorithm for partitioning a gray-level image into connected homogeneous regions. The novelty of this algorithm lies in the fact that by constructing a minimum spanning tree representation of a gray-level image, it reduces a region partitioning problem to a minimum spanning tree partitioning problem, and hence reduces the computational complexity of the region partitioning problem. The tree-partitioning algorithm, in essence, partitions a minimum spanning tree into subtrees, representing different homogeneous regions, by minimizing the sum of variations of gray levels over all subtrees under the constraints that each subtree should have at least a specified number of nodes, and two adjacent subtrees should have significantly different average gray-levels. Two (faster) heuristic implementations are also given for large-scale region partitioning problems. Test results have shown that the segmentation results are satisfactory and insensitive to noise.

  11. Theoretical solution of the minimum charge problem for gaseous detonations

    SciTech Connect (OSTI)

    Ostensen, R.W.

    1990-12-01

    A theoretical model was developed for the minimum charge to trigger a gaseous detonation in spherical geometry as a generalization of the Zeldovich model. Careful comparisons were made between the theoretical predictions and experimental data on the minimum charge to trigger detonations in propane-air mixtures. The predictions are an order of magnitude too high, and there is no apparent resolution to the discrepancy. A dynamic model, which takes into account the experimentally observed oscillations in the detonation zone, may be necessary for reliable predictions. 27 refs., 9 figs.

  12. ENHANCING STAKEHOLDER ACCEPTANCE OF BIOREMEDIATION TECHNOLOGIES

    SciTech Connect (OSTI)

    Focht, Will; Albright, Matt; Anex, Robert P., Jr., ed.

    2009-04-21

    This project inquired into the judgments and beliefs of people living near DOE reservations and facilities at Oak Ridge, Tennessee; Hanford, Washington; and Los Alamos, Tennessee about bioremediation of subsurface contamination. The purpose of the investigation was to identify strategies based on these judgments and beliefs for enhancing public support of bioremediation. Several methods were used to collect and analyze data including content analysis of transcripts of face-to-face personal interviews, factor analysis of subjective perspectives using Q methodology, and statistical analysis of results from a large-sample randomized telephone survey. Content analysis of interview transcripts identified themes about public perceptions and constructions of contamination risk, risk management, and risk managers. This analysis revealed that those who have no employment relationship at the sites and are not engaged in technical professions are most concerned about contamination risks. We also found that most interviewees are unfamiliar with subsurface contamination risks and how they can be reduced, believe they have little control over exposure, are frustrated with the lack of progress in remediation, are concerned about a lack of commitment of DOE to full remediation, and distrust site managers to act in the public interest. Concern is also expressed over frequent site management turnover, excessive secrecy, ineffective and biased communication, perceived attempts to talk the public into accepting risk, and apparent lack of concern about community welfare. In the telephone survey, we asked respondents who were aware of site contamination about their perceptions of risk from exposure to subsurface contamination. Response analysis revealed that most people believe that they are at significant risk from subsurface contamination but they acknowledge that more education is needed to calibrate risk perceptions against scientific risk assessments. Most rate their personal

  13. The"minimum information about an environmental sequence" (MIENS) specification

    SciTech Connect (OSTI)

    Yilmaz, P.; Kottmann, R.; Field, D.; Knight, R.; Cole, J.R.; Amaral-Zettler, L.; Gilbert, J.A.; Karsch-Mizrachi, I.; Johnston, A.; Cochrane, G.; Vaughan, R.; Hunter, C.; Park, J.; Morrison, N.; Rocca-Serra, P.; Sterk, P.; Arumugam, M.; Baumgartner, L.; Birren, B.W.; Blaser, M.J.; Bonazzi, V.; Bork, P.; Buttigieg, P. L.; Chain, P.; Costello, E.K.; Huot-Creasy, H.; Dawyndt, P.; DeSantis, T.; Fierer, N.; Fuhrman, J.; Gallery, R.E.; Gibbs, R.A.; Giglio, M.G.; Gil, I. San; Gonzalez, A.; Gordon, J.I.; Guralnick, R.; Hankeln, W.; Highlander, S.; Hugenholtz, P.; Jansson, J.; Kennedy, J.; Knights, D.; Koren, O.; Kuczynski, J.; Kyrpides, N.; Larsen, R.; Lauber, C.L.; Legg, T.; Ley, R.E.; Lozupone, C.A.; Ludwig, W.; Lyons, D.; Maguire, E.; Methe, B.A.; Meyer, F.; Nakieny, S.; Nelson, K.E.; Nemergut, D.; Neufeld, J.D.; Pace, N.R.; Palanisamy, G.; Peplies, J.; Peterson, J.; Petrosino, J.; Proctor, L.; Raes, J.; Ratnasingham, S.; Ravel, J.; Relman, D.A.; Assunta-Sansone, S.; Schriml, L.; Sodergren, E.; Spor, A.; Stombaugh, J.; Tiedje, J.M.; Ward, D.V.; Weinstock, G.M.; Wendel, D.; White, O.; Wikle, A.; Wortman, J.R.; Glockner, F.O.; Bushman, F.D.; Charlson, E.; Gevers, D.; Kelley, S.T.; Neubold, L.K.; Oliver, A.E.; Pruesse, E.; Quast, C.; Schloss, P.D.; Sinha, R.; Whitely, A.

    2010-10-15

    We present the Genomic Standards Consortium's (GSC) 'Minimum Information about an ENvironmental Sequence' (MIENS) standard for describing marker genes. Adoption of MIENS will enhance our ability to analyze natural genetic diversity across the Tree of Life as it is currently being documented by massive DNA sequencing efforts from myriad ecosystems in our ever-changing biosphere.

  14. The future potential of earth sheltered structures: cost, acceptability and planning considerations

    SciTech Connect (OSTI)

    Sterling, R.L.; Carmody, J.

    1980-12-01

    Earth sheltered structures have received an increasing amount of attention over the past few years. This has been primarily due to their typically low requirements for both heating and cooling energy. Their potential; however, not only lies in their energy performance but also in their ability to deal with a number of planning and design issues that must be faced in many locations. These issues include: noise protection, storm protection, saving a usable land area above the building and providing a minimum impact on the environment and ecology of a site. Against this promising potential must be weighed the factors which have made such structures undesirable from a designer's and user's point of view in the past. In addition, there are also a few new constraints which have arisen as the use of this building form has grown. This paper examines these issues and discusses the current acceptability and possible future potential of earth sheltered structures.

  15. Detector Group Leader Accepts Additional Role as Lab's Chief Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Officer | Jefferson Lab Detector Group Leader Accepts Additional Role as Lab's Chief Technology Officer Detector Group Leader Accepts Additional Role as Lab's Chief Technology Officer Drew Weisenberger Drew Weisenberger, who has led the Radiation Detector and Imaging Group at Jefferson Lab since 2008, recently accepted the additional role of Chief Technology Officer (CTO) for the lab. Andrew "Drew" Weisenberger, head of the Experimental Nuclear Physics Division's Radiation Detector

  16. Guidelines, Checklist, and Contract Clauses for Government Acceptance of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ESPC Projects | Department of Energy Guidelines, Checklist, and Contract Clauses for Government Acceptance of ESPC Projects Guidelines, Checklist, and Contract Clauses for Government Acceptance of ESPC Projects Document lists all the elements required for a completed energy savings performance contract (ESPC) project to receive federal government acceptance. Download the guidance, checklist, and contract clauses. (89.5 KB) More Documents & Publications Guide to Government Witnessing and

  17. Energy, Treasury Now Accepting Applications for Funding For Renewable

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Projects | Department of Energy Energy, Treasury Now Accepting Applications for Funding For Renewable Energy Projects Energy, Treasury Now Accepting Applications for Funding For Renewable Energy Projects July 31, 2009 - 12:00am Addthis WASHINGTON - With the goal of expanding development of renewable energy projects throughout the United States and creating new jobs, the U.S. Department of Energy and the U.S. Department of the Treasury today announced they are now accepting

  18. EV Everywhere Grand Challenge: Consumer Acceptance and Charging

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Workshop Agenda | Department of Energy Agenda EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Agenda Agenda for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA agenda_caci.pdf (218.57 KB) More Documents & Publications EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop - Backsplash EV Everywhere Grand Challenge:

  19. Energy Department Accepting Small Business Grant Applications for Large

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Turbines | Department of Energy Accepting Small Business Grant Applications for Large Wind Turbines Energy Department Accepting Small Business Grant Applications for Large Wind Turbines November 26, 2014 - 2:55pm Addthis The Energy Department began accepting applications on November 24 for its FY 2015 Phase 1 grant topics, including a Wind Program topic, under the Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs. SBIR/STTR grants are

  20. ORISE Contract, PART I - SCHEDULE, Section E Inspection and Acceptance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E INSPECTION AND ACCEPTANCE E.1 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT (APR 1984) ......................................................................................................................... 3 E.2 ACCEPTANCE (MAY 1997) .......................................................................................... 4 Section E - Page 1 of 4 DE-AC05-06OR23100 Blank Page Section E - Page 2 of 4 DE-AC05-06OR23100 PART I - SCHEDULE SECTION E INSPECTION AND ACCEPTANCE E.1 52.246-5

  1. Applications Being Accepted for National Geothermal Academy | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Being Accepted for National Geothermal Academy Applications Being Accepted for National Geothermal Academy January 19, 2010 - 3:10pm Addthis The U.S. Department of Energy's Geothermal Technologies Program is pleased to announce that applications are now being accepted for The National Geothermal Academy. Funded by the Geothermal Technologies Program, this 8-week intensive summer course for undergraduate and graduate students covers all aspects of geothermal energy development from

  2. Applications Now Being Accepted for National Geothermal Academy |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Now Being Accepted for National Geothermal Academy Applications Now Being Accepted for National Geothermal Academy January 19, 2011 - 4:46pm Addthis The U.S. Department of Energy's Geothermal Technologies Program is pleased to announce that applications are now being accepted for The National Geothermal Academy. Funded by the Geothermal Technologies Program, this 8-week intensive summer course for undergraduate and graduate students covers all aspects of geothermal

  3. Research Experience in Carbon Sequestration Training Program Now Accepting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applications | Department of Energy Research Experience in Carbon Sequestration Training Program Now Accepting Applications Research Experience in Carbon Sequestration Training Program Now Accepting Applications March 26, 2012 - 1:00pm Addthis Washington, D.C. - A Department of Energy (DOE) program that helps graduate students and early career professionals gain hands-on field research experience in areas related to carbon capture, utilization and storage (CCUS) is accepting applications

  4. Bid_Decision_Gate

    Office of Environmental Management (EM)

    America's Transition to a Clean Energy Future | Department of Energy Beyond Solyndra: How the Energy Department's Loans are Accelerating America's Transition to a Clean Energy Future Beyond Solyndra: How the Energy Department's Loans are Accelerating America's Transition to a Clean Energy Future Addthis 1 of 14 2 of 14 3 of 14 4 of 14 5 of 14 6 of 14 7 of 14 8 of 14 9 of 14 10 of 14 11 of 14 12 of 14 13 of 14 14 of 14 Department of Energy

    Beyond Tesla and Edison: Other Luminaries

  5. BID | Open Energy Information

    Open Energy Info (EERE)

    sostenible y respetuosa con el clima. Fundado en 1959, somos la mayor fuente de financiamiento para el desarrollo de Amrica Latina y el Caribe, con un slido compromiso para...

  6. EV Everywhere Consumer Acceptance Workshop: Breakout Group B...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon Group B - Consumer Acceptance Report Out.pdf More Documents & ...

  7. EV Everywhere Grand Challenge: Consumer Acceptance and Charging...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon ...

  8. EV Everywhere Grand Challenge: Consumer Acceptance and Charging...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon ...

  9. CRF Experiment Confirms Accepted Oxidation Scheme of Proposed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EnergyWater History Water Monitoring & Treatment Technology Decision Models for ... generally accepted dimethyl ether (DME) oxidation scheme at low temperature (540 K, 267 C). ...

  10. EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop- Backsplash

    Broader source: Energy.gov [DOE]

    Backsplash for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

  11. Hanford Site Solid Waste Acceptance Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    units complies with all environmental, safety, and operational requirements. This web site describes the Hanford Site program for acceptance of radioactive waste....

  12. Guidelines and Checklist for Commissioning and Government Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines and Checklist for Commissioning and Government Acceptance of ESPC ENABLE ... More Documents & Publications Guidelines, Checklist, and Contract Clauses for Government ...

  13. Research Experience in Carbon Sequestration 2015 Now Accepting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Now Accepting Applications Research Experience in Carbon Sequestration 2015 Now ... Graduate students and early career professionals can gain hands-on field research ...

  14. Research Experience in Carbon Sequestration 2010 Now Accepting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Now Accepting Applications Research Experience in Carbon Sequestration 2010 Now ... (CCS) by participating in the Research Experience in Carbon Sequestration (RECS) program. ...

  15. Research Experience in Carbon Sequestration 2016 Now Accepting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Experience in Carbon Sequestration 2016 Now Accepting Applications Research Experience in ... professionals can gain hands-on field research experience in areas related to carbon ...

  16. Research Experience in Carbon Sequestration 2013 Now Accepting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Now Accepting Applications Research Experience in Carbon Sequestration 2013 Now ... professionals can gain hands-on field research experience in areas related to carbon ...

  17. Cold test data for equipment acceptance into 105-KE Basin

    SciTech Connect (OSTI)

    Packer, M.J.

    1994-11-09

    This document provides acceptance testing of equipment to be installed in the 105-KE Basin for pumping sludge to support the discharge chute barrier doors installation.

  18. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    SciTech Connect (OSTI)

    Kelly, C.E.; Klee, P.M.

    1997-12-31

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, mass properties (weight and c.g.) and thermal vacuum test. This paper presents the thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is the backup RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at the Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on these tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also shown. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over 5% are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  19. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    SciTech Connect (OSTI)

    Kelly, C.E.; Klee, P.M.

    1997-06-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is tile back-up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission.

  20. Structural acceptance criteria Remote Handling Building Tritium Extraction Facility

    SciTech Connect (OSTI)

    Mertz, G.

    1999-12-16

    This structural acceptance criteria contains the requirements for the structural analysis and design of the Remote Handling Building (RHB) in the Tritium Extraction Facility (TEF). The purpose of this acceptance criteria is to identify the specific criteria and methods that will ensure a structurally robust building that will safely perform its intended function and comply with the applicable Department of Energy (DOE) structural requirements.

  1. Improved initial guess for minimum energy path calculations

    SciTech Connect (OSTI)

    Smidstrup, Sren; Pedersen, Andreas; Stokbro, Kurt

    2014-06-07

    A method is presented for generating a good initial guess of a transition path between given initial and final states of a system without evaluation of the energy. An objective function surface is constructed using an interpolation of pairwise distances at each discretization point along the path and the nudged elastic band method then used to find an optimal path on this image dependent pair potential (IDPP) surface. This provides an initial path for the more computationally intensive calculations of a minimum energy path on an energy surface obtained, for example, by ab initio or density functional theory. The optimal path on the IDPP surface is significantly closer to a minimum energy path than a linear interpolation of the Cartesian coordinates and, therefore, reduces the number of iterations needed to reach convergence and averts divergence in the electronic structure calculations when atoms are brought too close to each other in the initial path. The method is illustrated with three examples: (1) rotation of a methyl group in an ethane molecule, (2) an exchange of atoms in an island on a crystal surface, and (3) an exchange of two Si-atoms in amorphous silicon. In all three cases, the computational effort in finding the minimum energy path with DFT was reduced by a factor ranging from 50% to an order of magnitude by using an IDPP path as the initial path. The time required for parallel computations was reduced even more because of load imbalance when linear interpolation of Cartesian coordinates was used.

  2. untitled

    Gasoline and Diesel Fuel Update (EIA)

    ... Acceptable Bid Prices for the Test Sale of Strategic Petroleum Reserve Crude Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  3. Minimum information about a marker gene sequence (MIMARKS) and minimum information about any (x) sequence (MIxS) specifications.

    SciTech Connect (OSTI)

    Yilmaz, P.; Kottmann, R.; Field, D.; Knight, R.; Cole, J. R.; Amaral-Zettler, L.; Gilbert, J. A.

    2011-05-01

    Here we present a standard developed by the Genomic Standards Consortium (GSC) for reporting marker gene sequences - the minimum information about a marker gene sequence (MIMARKS). We also introduce a system for describing the environment from which a biological sample originates. The 'environmental packages' apply to any genome sequence of known origin and can be used in combination with MIMARKS and other GSC checklists. Finally, to establish a unified standard for describing sequence data and to provide a single point of entry for the scientific community to access and learn about GSC checklists, we present the minimum information about any (x) sequence (MIxS). Adoption of MIxS will enhance our ability to analyze natural genetic diversity documented by massive DNA sequencing efforts from myriad ecosystems in our ever-changing biosphere.

  4. Minimum length, extra dimensions, modified gravity and black hole remnants

    SciTech Connect (OSTI)

    Maziashvili, Michael

    2013-03-01

    We construct a Hilbert space representation of minimum-length deformed uncertainty relation in presence of extra dimensions. Following this construction, we study corrections to the gravitational potential (back reaction on gravity) with the use of correspondingly modified propagator in presence of two (spatial) extra dimensions. Interestingly enough, for r?0 the gravitational force approaches zero and the horizon for modified Schwarzschild-Tangherlini space-time disappears when the mass approaches quantum-gravity energy scale. This result points out to the existence of zero-temperature black hole remnants in ADD brane-world model.

  5. EA-1977: Acceptance and Disposition of Used Nuclear Fuel Containing...

    Energy Savers [EERE]

    Fuel Containing U.S.-Origin Highly Enriched Uranium from the Federal Republic of Germany EA-1977: Acceptance and Disposition of Used Nuclear Fuel Containing U.S.-Origin...

  6. Survey of methods for improving operator acceptance of computerized aids

    SciTech Connect (OSTI)

    Frey, P. R.; Kisner, R. A.

    1982-04-01

    The success of current attempts to improve the operational performance and safety of nuclear power plants by installing computerized operational aids in the control rooms is dependent, in part, on the operator's attitude toward the aid. Utility experience with process computer systems indicates that problems may already exist with operator acceptance of computerized aids. The growth of the role that computers have in nuclear power plants makes user acceptance of computer technology an important issue for the nuclear industry. The purpose of this report is to draw from the literature factors related to user acceptance of computerized equipment that may also be applicable to the acceptance of computerized aids used in the nuclear power plant control room.

  7. Radioisotope Thermoelectric Generator F7 Flight Unit Acceptance Buy Off

    SciTech Connect (OSTI)

    1997-02-20

    These are viewgraphs from the subject presentation. The LMMS E-7 history is outlined; Qualification and use of the F-7 GPHS-RTG for the Cassini mission; and the F-7 acceptance test program and performance are described.

  8. CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JLAB ACCESS: The REAL ID Act (Public Law 109-13) now determines which state driver's license can be presented and accepted as a valid ID document for access to Jefferson Lab. The...

  9. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  10. Rotary mode core sampling service trailer acceptance test report

    SciTech Connect (OSTI)

    Kostelnik, A.J.

    1996-02-12

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-056. The equipment was tested according to WHC-SD-WM-ATP-111 Rev.1.

  11. Social Acceptance of Geothermal Power Generation in Japan | Open...

    Open Energy Info (EERE)

    Power Generation in Japan Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Social Acceptance of Geothermal Power Generation in Japan Abstract In...

  12. Draft EA for the Acceptance and Disposition of Spent Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA for the Acceptance and Disposition of Spent Nuclear Fuel Containing U.S.-Origin Highly ... AND DISPOSITION OF SPENT NUCLEAR FUEL CONTAINING U.S.-ORIGIN HIGHLY ENRICHED ...

  13. Social Acceptance of Geothermal Energy in Southern Italy | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Conference Paper: Social Acceptance of Geothermal Energy in Southern Italy Abstract Although Italy has any possible reason to be...

  14. EV Everywhere Consumer Acceptance Workshop: Breakout Group B Report Out

    Broader source: Energy.gov [DOE]

    Group B breakout session presentation for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

  15. 1-MWe heat exchangers for OTEC. Final acceptance document

    SciTech Connect (OSTI)

    Snyder, J.E.

    1980-06-19

    Acceptance documents for major units of 1 MWe OTEC heat exchangers, including condensers and evaporators, are provided. Included are a transportation plan for the heat exchangers and design specifications for the phase separator. (LEW)

  16. EM Waste Acceptance Product Specification (WAPS) for Vitrified...

    Office of Environmental Management (EM)

    EM Waste Acceptance Product Specification (WAPS) for Vitrified High-Level Waste Forms Presentation to the HLW Corporate Board July 24, 2008 By Tony KlukKen Picha 2 Background * ...

  17. Energy dependence of acceptance-corrected dielectron excess mass...

    Office of Scientific and Technical Information (OSTI)

    Energy dependence of acceptance-corrected dielectron excess mass spectrum at mid-rapidity in Au+Au collisions at sNN19.6 and 200 GeV Citation Details In-Document Search Title:...

  18. Indian Energy Summer Internship Program Now Accepting Applications:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deadline Is March 27 | Department of Energy Summer Internship Program Now Accepting Applications: Deadline Is March 27 Indian Energy Summer Internship Program Now Accepting Applications: Deadline Is March 27 March 12, 2015 - 11:49am Addthis Deborah Tewa focused on tribal off-grid photovoltaic systems and renewable energy systems during her 2002 internship. Photo courtesy from Sandra Begay-Campbell, Sandia National Laboratories. Deborah Tewa focused on tribal off-grid photovoltaic systems and

  19. Idaho CERCLA Disposal Facility Complex Waste Acceptance Criteria

    SciTech Connect (OSTI)

    W. Mahlon Heileson

    2006-10-01

    The Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) has been designed to accept CERCLA waste generated within the Idaho National Laboratory. Hazardous, mixed, low-level, and Toxic Substance Control Act waste will be accepted for disposal at the ICDF. The purpose of this document is to provide criteria for the quantities of radioactive and/or hazardous constituents allowable in waste streams designated for disposal at ICDF. This ICDF Complex Waste Acceptance Criteria is divided into four section: (1) ICDF Complex; (2) Landfill; (3) Evaporation Pond: and (4) Staging, Storage, Sizing, and Treatment Facility (SSSTF). The ICDF Complex section contains the compliance details, which are the same for all areas of the ICDF. Corresponding sections contain details specific to the landfill, evaporation pond, and the SSSTF. This document specifies chemical and radiological constituent acceptance criteria for waste that will be disposed of at ICDF. Compliance with the requirements of this document ensures protection of human health and the environment, including the Snake River Plain Aquifer. Waste placed in the ICDF landfill and evaporation pond must not cause groundwater in the Snake River Plain Aquifer to exceed maximum contaminant levels, a hazard index of 1, or 10-4 cumulative risk levels. The defined waste acceptance criteria concentrations are compared to the design inventory concentrations. The purpose of this comparison is to show that there is an acceptable uncertainty margin based on the actual constituent concentrations anticipated for disposal at the ICDF. Implementation of this Waste Acceptance Criteria document will ensure compliance with the Final Report of Decision for the Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. For waste to be received, it must meet the waste acceptance criteria for the specific disposal/treatment unit (on-Site or off-Site) for which it is destined.

  20. NNSA Accepts University of California Settlement Offer for Deficiencies in

    National Nuclear Security Administration (NNSA)

    Security Procedure | National Nuclear Security Administration | (NNSA) Accepts University of California Settlement Offer for Deficiencies in Security Procedure December 17, 2007 WASHINGTON, DC - The Department of Energy's National Nuclear Security Administration (NNSA) has accepted an offer from the University of California regarding the final notice of violation issued to the university in September 2007 for violations of the department's classified information security requirements during

  1. EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Introduction | Department of Energy Workshop Introduction EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop Introduction Presentation given at the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA 1_sandalow_caci.pdf (3.39 MB) More Documents & Publications EV Everywhere Framing Workshop Overview EV Everywhere Battery Workshop Introduction EV Everywhere Grand Challenge

  2. EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Charging Infrastructure Group D Breakout Report | Department of Energy D Breakout Report EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop: Charging Infrastructure Group D Breakout Report Breakout session presentation for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA group_d_report_out_caci.pdf (148.33 KB) More Documents & Publications EV Everywhere Consumer

  3. Interim Report on Customer Acceptance, Retention, and Response to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Time-Based Rates from the Consumer Behavior Studies (June 2015) | Department of Energy Interim Report on Customer Acceptance, Retention, and Response to Time-Based Rates from the Consumer Behavior Studies (June 2015) Interim Report on Customer Acceptance, Retention, and Response to Time-Based Rates from the Consumer Behavior Studies (June 2015) Since 2009, the U.S. Department of Energy, using funds from the American Recovery and Reinvestment Act, and the electric power industry have jointly

  4. Los Alamos Waste Acceptance Criteria | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Acceptance Criteria Los Alamos Waste Acceptance Criteria This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. Additional documents referenced and listed in the Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014, report in Attachment F. Bibliography and References, are available on various public

  5. SUSTAINABILITY NEWS EPA's 2013 Federal Electronics Challenge Accepting Nominations

    Energy Savers [EERE]

    EPA's 2013 Federal Electronics Challenge Accepting Nominations Nominations are currently being accepted for the Environmental Protection Agency's 2013 Federal Electronics Challenge (FEC). The FEC recognizes teams and individuals from across the Federal government who demonstrate a commitment to electronic stewardship through sustainable purchasing, management, and disposal of electronic assets. Last year, DOE won one-third of all FEC awards. The deadline for nominations is January 31, 2013. For

  6. Theoretical Minimum Energies to Produce Steel for Selected Conditions

    SciTech Connect (OSTI)

    Fruehan, R.J.; Fortini, O.; Paxton, H.W.; Brindle, R.

    2000-05-01

    The energy used to produce liquid steel in today's integrated and electric arc furnace (EAF) facilities is significantly higher than the theoretical minimum energy requirements. This study presents the absolute minimum energy required to produce steel from ore and mixtures of scrap and scrap alternatives. Additional cases in which the assumptions are changed to more closely approximate actual operating conditions are also analyzed. The results, summarized in Table E-1, should give insight into the theoretical and practical potentials for reducing steelmaking energy requirements. The energy values have also been converted to carbon dioxide (CO{sub 2}) emissions in order to indicate the potential for reduction in emissions of this greenhouse gas (Table E-2). The study showed that increasing scrap melting has the largest impact on energy consumption. However, scrap should be viewed as having ''invested'' energy since at one time it was produced by reducing ore. Increasing scrap melting in the BOF mayor may not decrease energy if the ''invested'' energy in scrap is considered.

  7. Acceptance test report for core sample trucks 3 and 4

    SciTech Connect (OSTI)

    Corbett, J.E.

    1996-04-10

    The purpose of this Acceptance Test Report is to provide documentation for the acceptance testing of the rotary mode core sample trucks 3 and 4, designated as HO-68K-4600 and HO-68K-4647, respectively. This report conforms to the guidelines established in WHC-IP-1026, ``Engineering Practice Guidelines,`` Appendix M, ``Acceptance Test Procedures and Reports.`` Rotary mode core sample trucks 3 and 4 were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Successful completion of acceptance testing on June 30, 1995 verified that all design requirements were met. This report is divided into four sections, beginning with general information. Acceptance testing was performed on trucks 3 and 4 during the months of March through June, 1995. All testing was performed at the ``Rock Slinger`` test site in the 200 West area. The sequence of testing was determined by equipment availability, and the initial revision of the Acceptance Test Procedure (ATP) was used for both trucks. Testing was directed by ICF-KH, with the support of WHC Characterization Equipment Engineering and Characterization Project Operations. Testing was completed per the ATP without discrepancies or deviations, except as noted.

  8. Natural Gas Weekly Update, Printer-Friendly Version

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    received a total of 8 bids, while the second highest accepted bid was the 34 million Green Canyon Block 551, awarded to Anadarko Petroleum Corporation and Newfield Exploration...

  9. Acceptance sampling using judgmental and randomly selected samples

    SciTech Connect (OSTI)

    Sego, Landon H.; Shulman, Stanley A.; Anderson, Kevin K.; Wilson, John E.; Pulsipher, Brent A.; Sieber, W. Karl

    2010-09-01

    We present a Bayesian model for acceptance sampling where the population consists of two groups, each with different levels of risk of containing unacceptable items. Expert opinion, or judgment, may be required to distinguish between the high and low-risk groups. Hence, high-risk items are likely to be identifed (and sampled) using expert judgment, while the remaining low-risk items are sampled randomly. We focus on the situation where all observed samples must be acceptable. Consequently, the objective of the statistical inference is to quantify the probability that a large percentage of the unsampled items in the population are also acceptable. We demonstrate that traditional (frequentist) acceptance sampling and simpler Bayesian formulations of the problem are essentially special cases of the proposed model. We explore the properties of the model in detail, and discuss the conditions necessary to ensure that required samples sizes are non-decreasing function of the population size. The method is applicable to a variety of acceptance sampling problems, and, in particular, to environmental sampling where the objective is to demonstrate the safety of reoccupying a remediated facility that has been contaminated with a lethal agent.

  10. Determinants of debit cards acceptance: An empirical investigation

    SciTech Connect (OSTI)

    Ismail, Shafinar; Adnan, Azimah; Azizi, Amsyar; Bakri, Mohamed Hariri; Zulkepli, Jafri

    2014-12-04

    These days, most of the Malaysians realize that the consumption of debit card will help them to reduce the household debt. Thus, it is important to analyse the acceptance of debit cards for further enhancement and expanding its market share in Malaysia. In addition, there is lacked of research being conducted on the determinants affecting the acceptance of debit cards among Malaysians. Thus, the study aimed to investigate the factors affecting the acceptance of debit cards. This study focuses on payment methods, consumer attitude, and safety of debit card in acceptance of debit cards. Questionnaires were distributed to the 300 respondents. The sampling procedure adopted was stratified random sampling. The data obtained were analysed using SPSS 20.0 which involves scale reliability, descriptive and regression analysis. The result indicates that payment methods, consumer attitude and safety are the determinants of debit cards acceptance. Safety is the best predictor as most of the customers are confidents to use debit cards because of the security being developed around these debit card transactions. The analyses presented in this study can be used by policymakers and managers as a guide to promote banking products and services. The findings achieved in this study will be of interest for practitioners and academics concerned with developments of the Malaysian banking industry.

  11. Strain-Based Acceptance Criteria for Energy-Limited Events

    SciTech Connect (OSTI)

    Spencer D. Snow; Dana K. Morton

    2009-07-01

    The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code was primarily written with stress-based acceptance criteria. These criteria are applicable to force, displacement, and energy-controlled loadings and ensure a factor of safety against failure. However, stress-based acceptance criteria are often quite conservative for one time energy-limited events such as accidental drops and impacts. For several years, the ASME Working Group on Design of Division 3 Containments has been developing the Design Articles for Section III, Division 3, “Containments for Transportation and Storage of Spent Nuclear Fuel and High-Level Radioactive Material and Waste,” and has wanted to establish strain-based acceptance criteria for accidental drops of containments. This Division 3 working group asked the Working Group on Design Methodology (WGDM) to assist in developing these strain-based acceptance criteria. This paper discusses the current proposed strain-based acceptance criteria, associated limitations of use, its background development, and the current status.

  12. PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report

    SciTech Connect (OSTI)

    Blackaby, W.B.

    1997-10-07

    This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as designed. The proper installation of the PUREX SAMCONS Trailer UPS components and wiring will be systematically evaluated by performance of this procedure. Proper operation of the SAMCONS computer UPS will be verified by performance of a timed functional load test, and verification of associated alarms and trouble indications. This test procedure will be performed in the SAMCONS Trailer and will include verification of receipt of alarms at the SAMCONS computer stations. This test may be performed at any time after the completion of HNF-SD-CP-ATP-083, PUREX Surveillance and Monitoring and Control System (SAMCONS) Acceptance Test Procedure, when computer display and alarm functions have been proven to operate correctly.

  13. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    SciTech Connect (OSTI)

    Barrett, R.A.

    1995-03-06

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

  14. Now Available: Interim Report on Customer Acceptance, Retention, and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Response to Time-Based Rates from the Consumer Behavior Studies | Department of Energy Interim Report on Customer Acceptance, Retention, and Response to Time-Based Rates from the Consumer Behavior Studies Now Available: Interim Report on Customer Acceptance, Retention, and Response to Time-Based Rates from the Consumer Behavior Studies June 26, 2015 - 5:30pm Addthis Since 2009, the U.S. Department of Energy, using funds from the American Recovery and Reinvestment Act, and the electric power

  15. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA, JUNE 2006

    SciTech Connect (OSTI)

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

    2006-06-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  16. CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS: The REAL ID Act (Public Law 109-13) now determines which state driver's license can be presented and accepted as a valid ID document for access to Jefferson Lab. The following states/US territories have been determined by the U.S. Department of Homeland Security to have failed to comply with the REAL ID Act: American Samoa, Minnesota, Missouri, Washington As of March 2, 2015, Jefferson Lab will begin using the REAL ID Act verification for all

  17. Standardization of DOE Disposal Facilities Waste Acceptance Processes

    SciTech Connect (OSTI)

    Shrader, T. A.; Macbeth, P. J.

    2002-02-26

    On February 25, 2000, the U.S. Department of Energy (DOE) issued the Record of Decision (ROD) for the Waste Management Programmatic Environmental Impact Statement (WM PEIS) for low-level and mixed low-level wastes (LLW/ MLLW) treatment and disposal. The ROD designated the disposal sites at Hanford and the Nevada Test Site (NTS) to dispose of LLW/MLLW from sites without their own disposal facilities. DOE's Richland Operations Office (RL) and the National Nuclear Security Administration's Nevada Operations Office (NV) have been charged with effectively implementing the ROD. To accomplish this task NV and RL, assisted by their operating contractors Bechtel Nevada (BN), Fluor Hanford (FH), and Bechtel Hanford (BH) assembled a task team to systematically map out and evaluate the current waste acceptance processes and develop an integrated, standardized process for the acceptance of LLW/MLLW. A structured, systematic, analytical process using the Six Sigma system identified dispos al process improvements and quantified the associated efficiency gains to guide changes to be implemented. The review concluded that a unified and integrated Hanford/NTS Waste Acceptance Process would be a benefit to the DOE Complex, particularly the waste generators. The Six Sigma review developed quantitative metrics to address waste acceptance process efficiency improvements, and provides an initial look at development of comparable waste disposal cost models between the two disposal sites to allow quantification of the proposed improvements.

  18. Standardization of DOE Disposal Facilities Waste Acceptance Process

    SciTech Connect (OSTI)

    SHRADER, T.; MACBETH, P.

    2002-01-01

    On February 25, 2000, the US. Department of Energy (DOE) issued the Record of Decision (ROD) for the Waste Management Programmatic Environmental Impact Statement (WM PEIS) for low-level and mixed low-level wastes (LLW/ MLLW) treatment and disposal. The ROD designated the disposal sites at Hanford and the Nevada Test Site (NTS) to dispose of LLWMLLW from sites without their own disposal facilities. DOE's Richland Operations Office (RL) and the National Nuclear Security Administration's Nevada Operations Office (NV) have been charged with effectively implementing the ROD. To accomplish this task NV and RL, assisted by their operating contractors Bechtel Nevada (BN), Fluor Hanford (FH), and Bechtel Hanford (BH) assembled a task team to systematically map out and evaluate the current waste acceptance processes and develop an integrated, standardized process for the acceptance of LLWMLLW. A structured, systematic, analytical process using the Six Sigma system identified disposal process improvements and quantified the associated efficiency gains to guide changes to be implemented. The review concluded that a unified and integrated Hanford/NTS Waste Acceptance Process would be a benefit to the DOE Complex, particularly the waste generators. The Six Sigma review developed quantitative metrics to address waste acceptance process efficiency improvements, and provides an initial look at development of comparable waste disposal cost models between the two disposal sites to allow quantification of the proposed improvements.

  19. Gas characterization system 241-AN-105 field acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AN-105. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  20. Gas characterization system 241-AW-101 field acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AW-101. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  1. Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant |

    Office of Environmental Management (EM)

    Department of Energy The documents included in this listing are additional references not included in the Phase 2 Radiological Release at the Waste Isolation Pilot Plant, Attachment F: Bibliography and References report. The documents were examined and used to develop the final report. Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant, DOE

  2. Anticipating Potential Waste Acceptance Criteria for Defense Spent Nuclear Fuel

    SciTech Connect (OSTI)

    Rechard, R.P.; Lord, M.E.; Stockman, C.T.; McCurley, R.D.

    1997-12-31

    The Office of Environmental Management of the U.S. Department of Energy is responsible for the safe management and disposal of DOE owned defense spent nuclear fuel and high level waste (DSNF/DHLW). A desirable option, direct disposal of the waste in the potential repository at Yucca Mountain, depends on the final waste acceptance criteria, which will be set by DOE`s Office of Civilian Radioactive Waste Management (OCRWM). However, evolving regulations make it difficult to determine what the final acceptance criteria will be. A method of anticipating waste acceptance criteria is to gain an understanding of the DOE owned waste types and their behavior in a disposal system through a performance assessment and contrast such behavior with characteristics of commercial spent fuel. Preliminary results from such an analysis indicate that releases of 99Tc and 237Np from commercial spent fuel exceed those of the DSNF/DHLW; thus, if commercial spent fuel can meet the waste acceptance criteria, then DSNF can also meet the criteria. In large part, these results are caused by the small percentage of total activity of the DSNF in the repository (1.5%) and regulatory mass (4%), and also because commercial fuel cladding was assumed to provide no protection.

  3. Could what that ESCO sales rep said really be true? Savings realization rates in ESPC versus bid-to-spec projects

    SciTech Connect (OSTI)

    Coleman, Philip; Earni, Shankar; Williams, Charles

    2014-08-11

    Claims that savings realization is greater in energy savings performance contracts (ESPCs) are rampant at least among energy service company representatives and other ESPC cheerleaders. But hard supporting evidence for these claims has been virtually non-existent. The Department of Energy's Federal Energy Management Program uses its Compliance Tracking System (CTS) database to document the performance of federal buildings and projects towards meeting various federal energy-saving goals. This paper focuses on preliminary analysis from CTS to understand and compare the performance of federal ESPCs with projects that have been implemented with more conventional government appropriations funding. The authors have found preliminary evidence using CTS that shows markedly higher savings realization rates among ESPC projects than appropriations-funded ones. There are numerous caveats to the data comparison that clamor for further study, but the difference is still intriguing. If borne out, this finding will provide concrete support to the idea that ESPCs guarantees and measurement and verification, long touted by energy service companies (ESCOs) as offering savings assurance, may truly yield substantial benefits. If ESPCs actually do perform better (i.e., have higher realization rates and savings persistence) than conventional bid-to-spec projects, the perceived premium for conducting them may look like a very good deal after all.

  4. NNSS Waste Acceptance 11-6-13_final_print-ready

    Office of Environmental Management (EM)

    NNSS Waste Acceptance Waste disposed at the Nevada National Security Site (NNSS) must comply with the NNSS waste acceptance criteria. Compliance is evaluated by a team of experts ...

  5. IDAPA 37.03.03 - Rules and Minimum Standards for the Construction...

    Open Energy Info (EERE)

    3 - Rules and Minimum Standards for the Construction and Use of Injection Wells Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  6. WRAP low level waste (LLW) glovebox acceptance test report

    SciTech Connect (OSTI)

    Leist, K.J.

    1998-02-17

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report.

  7. 105 K East isolation barrier acceptance analysis report

    SciTech Connect (OSTI)

    McCracken, K.J.; Irwin, J.J.

    1995-05-31

    The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KE/100K. The tests were performed in accordance with the test plan (McCracken 1995c) and acceptance test procedure (McCracken 1995a). The test report (McCracken 1995b) contains the test data. This document compares the test data (McCracken 1995b) against the criteria (McCracken 1995a, c). A discussion of the leak rate analytical characterization (Irwin 1995) describes how the flow characteristics and the flow rate will be determined using the test data from the test report (McCracken 1995b). The barriers must adequately control the leakage from the main basin to the discharge chute to less than the 1,500 gph (5,680 lph) Safety Analysis Report (SAR 1994) limit.

  8. MCO combustible gas management leak test acceptance criteria

    SciTech Connect (OSTI)

    SHERRELL, D.L.

    1999-05-11

    Existing leak test acceptance criteria for mechanically sealed and weld sealed multi-canister overpacks (MCO) were evaluated to ensure that MCOs can be handled and stored in stagnant air without compromising the Spent Nuclear Fuel Project's overall strategy to prevent accumulation of combustible gas mixtures within MCO's or within their surroundings. The document concludes that the integrated leak test acceptance criteria for mechanically sealed and weld sealed MCOs (1 x 10{sup -5} std cc/sec and 1 x 10{sup -7} std cc/sec, respectively) are adequate to meet all current and foreseeable needs of the project, including capability to demonstrate compliance with the NFPA 60 Paragraph 3-3 requirement to maintain hydrogen concentrations [within the air atmosphere CSB tubes] t or below 1 vol% (i.e., at or below 25% of the LFL).

  9. Market Acceptance of Advanced Automotive Technologies (MA3T) Model

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acceptance of Advanced Automotive Technologies (MA3T) Model (Oak Ridge National Laboratory) Objectives Forecasts sales of competing vehicle technologies among consumer segments. Analyzes how technology, infrastructure, consumer behavior, and policy affect sales of new technologies and determines the resulting societal, environmental and economic impacts. Key Attributes & Strengths MA3T can be used to investigate the societal benefits, costs, and employment impacts of market transitions

  10. ORISE: ORISE now accepting applications for EERE Postdoctoral Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Awards now accepting applications for EERE Postdoctoral Research Awards Ph.D. recipients will conduct research in energy efficiency and renewable energy at universities, national laboratories and other research facilities FOR IMMEDIATE RELEASE April 19, 2016 FY16-25 OAK RIDGE, Tenn.-ORISE, a U.S. Department of Energy (DOE) institute, is seeking Ph.D. researchers for a paid, two-year fellowship through the DOE's Office of Energy Efficiency & Renewable Energy (EERE). The EERE Postdoctoral

  11. Rotary mode core sampling service trailer Acceptance Test Plan

    SciTech Connect (OSTI)

    Kostelnik, A.J.

    1994-11-28

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of specification WHC-S-056 Rev.2 including ECNs 608798 and 616386. The equipment being tested is a furniture type trailer with storage cabinets, lighting and HVAC systems installed. The unit was purchased as a Design and Fabrication procurement activity. The ATP be performed by representatives of the Westinghouse Hanford Company with the assistance of the Seller at the Seller`s location.

  12. ORISE: Applications being accepted for internships and research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    opportunities with Oak Ridge Office of Environmental Management Program Applications being accepted for internships and research opportunities with Oak Ridge Office of Environmental Management Program ORAU-administered program gives students and recent graduates opportunities to explore a federal career with the U.S. Department of Energy FOR IMMEDIATE RELEASE May 12, 2015 FY15-31 OAK RIDGE, Tenn.- The U.S. Department of Energy's Oak Ridge Institute for Science and Education (ORISE) currently

  13. ORISE: Mickey Leland Energy Fellowship Program accepting applications for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2016 from graduate and undergraduate students the 2016 Mickey Leland Energy Fellowship Program from graduate and undergraduate students Women and minorities encouraged to apply; deadline is Dec. 21, 2015 FOR IMMEDIATE RELEASE Dec. 3, 2015 FY16-11 OAK RIDGE, Tenn.-ORISE is currently accepting applications for the 2016 Mickey Leland Energy Fellowship Program (MLEF), which is a 10-week summer program for students pursuing degrees in science, technology, engineering and math. The MLEF Program

  14. SUSTAINABILITY ANNOUNCEMENTS 2014 DOE Sustainability Awards Now Accepting Nominations

    Energy Savers [EERE]

    2014 DOE Sustainability Awards Now Accepting Nominations The Sustainability Performance Office (SPO) sponsors the DOE Sustainability Awards to recognize outstanding achievements of teams and individuals at DOE facilities across the country. The DOE Sustainability Awards celebrate programs, projects, and people that advance the Department's sustainability mission, including excellence in energy, water, and vehicle fleet management. The process for submitting nominations for the 2014 Awards is

  15. CRF Experiment Confirms Accepted Oxidation Scheme of Proposed Diesel

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alternative: Dimethyl Ether Experiment Confirms Accepted Oxidation Scheme of Proposed Diesel Alternative: Dimethyl Ether - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power &

  16. DOE acceptance of commercial mixed waste -- Studies are under way

    SciTech Connect (OSTI)

    Plummer, T.L.; Owens, C.M.

    1993-03-01

    The topic of the Department of Energy acceptance of commercial mixed waste at DOE facilities has been proposed by host States and compact regions that are developing low-level radioactive waste disposal facilities. States support the idea of DOE accepting commercial mixed waste because (a) very little commercial mixed waste is generated compared to generation by DOE facilities (Department of Energy--26,300 cubic meters annually vs. commercial--3400 cubic meters annually); (b) estimated costs for commercial disposal are estimated to be $15,000 to $40,000 per cubic foot; (c) once treatment capability becomes available, 70% of the current levels of commercial mixed waste will be eliminated, (d) some State laws prohibit the development of mixed waste disposal facilities in their States; (e) DOE is developing a nationwide strategy that will include treatment and disposal capacity for its own mixed waste and the incremental burden on the DOE facilities would be minuscule, and (6) no States are developing mixed waste disposal facilities. DOE senior management has repeatedly expressed willingness to consider investigating the feasibility of DOE accepting commercial mixed waste. In January 1991, Leo Duffy of the Department of energy met with members of the Low-Level Radioactive Waste Forum, which led to an agreement to explore such an arrangement. He stated that this seems like a cost-effective way to solve commercial mixed waste management problems.

  17. OSTIblog Articles in the accepted manuscript Topic | OSTI, US Dept of

    Office of Scientific and Technical Information (OSTI)

    Energy Office of Scientific and Technical Information accepted manuscript

  18. ITP Steel: Theoretical Minimum Energies to Produce Steel for Selected Conditions, March 2000

    Broader source: Energy.gov [DOE]

    The absolute theoretical minimum energies to produce liquid steel from idealized scrap (100% Fe) and ore (100% Fe2O3) are much lower than consumed in practice, as are the theoretical minimum energies to roll the steel into its final shape.

  19. Shape-memory transformations of NiTi: Minimum-energy pathways...

    Office of Scientific and Technical Information (OSTI)

    GrantContract Number: AC02-07CH11358 Type: Accepted Manuscript Journal Name: Physical Review Letters Additional Journal Information: Journal Volume: 113; Journal Issue: 26; ...

  20. PVUSA procurement, acceptance, and rating practices for photovoltaic power plants

    SciTech Connect (OSTI)

    Dows, R.N.; Gough, E.J.

    1995-09-01

    This report is one in a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California, and from participating utility host sites. During the course of approximately 7 years (1988--1994), 10 PV systems have been installed ranging from 20 kW to 500 kW. Six 20-kW emerging module technology arrays, five on universal project-provided structures and one turnkey concentrator, and four turnkey utility-scale systems (200 to 500 kW) were installed. PVUSA took a very proactive approach in the procurement of these systems. In the absence of established procurement documents, the project team developed a comprehensive set of technical and commercial documents. These have been updated with each successive procurement. Working closely with vendors after the award in a two-way exchange provided designs better suited for utility applications. This report discusses the PVUSA procurement process through testing and acceptance, and rating of PV turnkey systems. Special emphasis is placed on the acceptance testing and rating methodology which completes the procurement process by verifying that PV systems meet contract requirements. Lessons learned and recommendations are provided based on PVUSA experience.

  1. Notice of inquiry on waste acceptance issues: Response summary

    SciTech Connect (OSTI)

    1995-03-01

    On May 25, 1994, the Department of Energy published a Notice of Inquiry on Waste Acceptance Issues in the Federal Register. Through this Notice of Inquiry, the Department sought to implement the Secretary`s initiative to explore with affected parties various options and methods for sharing the costs related to the financial burden associated with continued on-site storage by eliciting the views of affected parties on: (1) The Department`s preliminary view that it does not have a statutory obligation to begin accepting spent nuclear fuel in 1998 in the absence of an operational repository or other suitable storage facility constructed under the Nuclear Waste Policy Act of 1982, as amended; (2) The need for an interim, away-from-reactor storage facility prior to repository operations; and (3) Options for offsetting, through the Nuclear Waste Fund, a portion of the financial burden that may be incurred by utilities in continuing to store spent nuclear fuel at reactor sites beyond 1998. The Department received a total of 1,111 responses representing 1,476 signatories to this Notice of Inquiry. The responses included submittals from utilities (38 responses); public utility/service commissions and utility regulators (26 responses); Federal, state, and local governments, agencies, and representatives (23 responses); industry and companies (30 responses); public interest groups and other organizations (19 responses); and members of the general public (975 responses).

  2. Summary Of Identification Of Rrgulatory Acceptability Of Enhanced Attenuation Categories

    SciTech Connect (OSTI)

    Vangelas, K

    2006-01-04

    Chlorinated solvents once introduced to the subsurface are a persistent contaminant. Though many types of active treatments have been developed and deployed to treat contaminated sites, most sites will ultimately incorporate the use of passive treatments into the remediation process. A process favored by many is the use of Monitored Natural Attenuation that relies on the natural attenuation processes occurring within the system to remediate the contaminants. However, it is likely there will be instances where the natural attenuation processes will be insufficient to reduce the level of contamination to acceptable levels in an acceptable span of time. Rather than redeploying source treatments, the Department of Energy along with the Interstate Technology and Regulatory Council (ITRC) are developing the concept of Enhanced Attenuation (EA). An enhancement is any type of intervention that might be implemented in a source-plume system that increases the magnitude of attenuation by natural processes beyond that which occurs without intervention. Enhanced Attenuation is the result of applying an enhancement or intervention technique that will sustainably manipulate a natural attenuation process leading to an increased reduction in mass flux of contaminants. Efforts are moving forward along several fronts in developing this concept. This effort is a follow-on to initial discussions with site owners, regulators and stakeholder organizations in the development of the concepts of Enhanced Attenuation, the use of mass balance to evaluate the stability of a waste site/groundwater plume, and identification of tools that will support characterization and monitoring efforts for MNA and EA treatments. Those discussions are documented in the report titled ''Summary Document of Workshops for Hanford, Oak Ridge and Savannah River Site as part of the Monitored Natural Attenuation and Enhanced Passive Remediation for Chlorinated Solvents-DOE Alternative Project for Technology

  3. High energy resolution, high angular acceptance crystal monochromator

    DOE Patents [OSTI]

    Alp, Ercan E.; Mooney, Timothy M.; Toellner, Thomas

    1996-06-04

    A 4-bounce dispersive crystal monochromator reduces the bandpass of synchrotron radiation to a 10-50 meV range without sacrificing angular acceptance. The monochromator includes the combination of an asymmetrical channel-cut single crystal of lower order reflection and a symmetrical channel-cut single crystal of higher order reflection in a nested geometric configuration. In the disclosed embodiment, a highly asymmetrically cut (.alpha.=20) outer silicon crystal (4 2 2) with low order reflection is combined with a symmetrically cut inner silicon crystal (10 6 4) with high order reflection to condition a hard x-ray component (5-30 keV) of synchrotron radiation down to the .mu.eV-neV level. Each of the crystals is coupled to the combination of a positioning inchworm and angle encoder via a respective rotation stage for accurate relative positioning of the crystals and precise energy tuning of the monochromator.

  4. High energy resolution, high angular acceptance crystal monochromator

    DOE Patents [OSTI]

    Alp, E.E.; Mooney, T.M.; Toellner, T.

    1996-06-04

    A 4-bounce dispersive crystal monochromator reduces the bandpass of synchrotron radiation to a 10-50 meV range without sacrificing angular acceptance. The monochromator includes the combination of an asymmetrical channel-cut single crystal of lower order reflection and a symmetrical channel-cut single crystal of higher order reflection in a nested geometric configuration. In the disclosed embodiment, a highly asymmetrically cut ({alpha}=20) outer silicon crystal (4 2 2) with low order reflection is combined with a symmetrically cut inner silicon crystal (10 6 4) with high order reflection to condition a hard x-ray component (5--30 keV) of synchrotron radiation down to the {micro}eV-neV level. Each of the crystals is coupled to the combination of a positioning inchworm and angle encoder via a respective rotation stage for accurate relative positioning of the crystals and precise energy tuning of the monochromator. 7 figs.

  5. Title 43 CFR 3206.12 What are the Minimum and Maximum Lease Sizes...

    Open Energy Info (EERE)

    .12 What are the Minimum and Maximum Lease Sizes? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  6. From Fjords to Open Seas: Ecological Genomics of Expanding Oxygen Minimum Zones (2010 JGI User Meeting)

    ScienceCinema (OSTI)

    Hallam, Steven

    2011-04-26

    Steven Hallam of the University of British Columbia talks "From Fjords to Open Seas: Ecological Genomics of Expanding Oxygen Minimum Zones" on March 24, 2010 at the 5th Annual DOE JGI User Meeting

  7. Tank monitor and control system (TMACS) software project Westronics Driver acceptance test

    SciTech Connect (OSTI)

    Glasscock, J.A.

    1998-08-18

    The acceptance test for the Westronics driver. This driver connects the Westronics Smart Multiplexer with the TMACS monitoring system.

  8. NNSS Waste Acceptance 11-6-13_final_print-ready

    Office of Environmental Management (EM)

    NNSS Waste Acceptance Waste disposed at the Nevada National Security Site (NNSS) must comply with the NNSS waste acceptance criteria. Compliance is evaluated by a team of experts in the areas of quality assurance, waste traceability, radiological characterization/nuclear criticality, and hazardous material characterization. The State of Nevada is involved throughout this waste review process. Waste Acceptance Criteria: Provide requirements, terms, and conditions under which waste is accepted for

  9. Energy and IAQ Implications of Alternative Minimum Ventilation Rates in California Retail and School Buildings

    SciTech Connect (OSTI)

    Dutton, Spencer M.; Fisk, William J.

    2015-01-01

    For a stand-alone retail building, a primary school, and a secondary school in each of the 16 California climate zones, the EnergyPlus building energy simulation model was used to estimate how minimum mechanical ventilation rates (VRs) affect energy use and indoor air concentrations of an indoor-generated contaminant. The modeling indicates large changes in heating energy use, but only moderate changes in total building energy use, as minimum VRs in the retail building are changed. For example, predicted state-wide heating energy consumption in the retail building decreases by more than 50% and total building energy consumption decreases by approximately 10% as the minimum VR decreases from the Title 24 requirement to no mechanical ventilation. The primary and secondary schools have notably higher internal heat gains than in the retail building models, resulting in significantly reduced demand for heating. The school heating energy use was correspondingly less sensitive to changes in the minimum VR. The modeling indicates that minimum VRs influence HVAC energy and total energy use in schools by only a few percent. For both the retail building and the school buildings, minimum VRs substantially affected the predicted annual-average indoor concentrations of an indoor generated contaminant, with larger effects in schools. The shape of the curves relating contaminant concentrations with VRs illustrate the importance of avoiding particularly low VRs.

  10. HOW TO DEAL WITH WASTE ACCEPTANCE UNCERTAINTY USING THE WASTE ACCEPTANCE CRITERIA FORECASTING AND ANALYSIS CAPABILITY SYSTEM (WACFACS)

    SciTech Connect (OSTI)

    Redus, K. S.; Hampshire, G. J.; Patterson, J. E.; Perkins, A. B.

    2002-02-25

    The Waste Acceptance Criteria Forecasting and Analysis Capability System (WACFACS) is used to plan for, evaluate, and control the supply of approximately 1.8 million yd3 of low-level radioactive, TSCA, and RCRA hazardous wastes from over 60 environmental restoration projects between FY02 through FY10 to the Oak Ridge Environmental Management Waste Management Facility (EMWMF). WACFACS is a validated decision support tool that propagates uncertainties inherent in site-related contaminant characterization data, disposition volumes during EMWMF operations, and project schedules to quantitatively determine the confidence that risk-based performance standards are met. Trade-offs in schedule, volumes of waste lots, and allowable concentrations of contaminants are performed to optimize project waste disposition, regulatory compliance, and disposal cell management.

  11. Data Quality Objectives for WTP Feed Acceptance Criteria - 12043

    SciTech Connect (OSTI)

    Arakali, Aruna V.; Benson, Peter A.; Duncan, Garth; Johnston, Jill C.; Lane, Thomas A.; Matis, George; Olson, John W.; Banning, Davey L.; Greer, Daniel A.; Seidel, Cary M.; Thien, Michael G.

    2012-07-01

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is under construction for the U.S. Department of Energy by Bechtel National, Inc. and subcontractor URS Corporation (contract no. DE-AC27-01RV14136). The plant when completed will be the world's largest nuclear waste treatment facility. Bechtel and URS are tasked with designing, constructing, commissioning, and transitioning the plant to the long term operating contractor to process the legacy wastes that are stored in underground tanks (from nuclear weapons production between the 1940's and the 1980's). Approximately 56 million gallons of radioactive waste is currently stored in these tanks at the Hanford Site in southeastern Washington. There are three major WTP facilities being constructed for processing the tank waste feed. The Pretreatment (PT) facility receives feed where it is separated into a low activity waste (LAW) fraction and a high level waste (HLW) fraction. These fractions are transferred to the appropriate (HLW or LAW) facility, combined with glass former material, and sent to high temperature melters for formation of the glass product. In addition to PT, HLW and LAW, other facilities in WTP include the Laboratory (LAB) for analytical services and the Balance of Facilities (BOF) for plant maintenance, support and utility services. The transfer of staged feed from the waste storage tanks and acceptance in WTP receipt vessels require data for waste acceptance criteria (WAC) parameters from analysis of feed samples. The Data Quality Objectives (DQO) development was a joint team effort between WTP and Tank Operations Contractor (TOC) representatives. The focus of this DQO effort was to review WAC parameters and develop data quality requirements, the results of which will determine whether or not the staged feed can be transferred from the TOC to WTP receipt vessels. The approach involved systematic planning for data collection consistent with EPA guidance for the seven-step DQO process

  12. ACCEPTABILITY ENVELOPE FOR METAL HYDRIDE-BASED HYDROGEN STORAGE SYSTEMS

    SciTech Connect (OSTI)

    Hardy, B.; Corgnale, C.; Tamburello, D.; Garrison, S.; Anton, D.

    2011-07-18

    The design and evaluation of media based hydrogen storage systems requires the use of detailed numerical models and experimental studies, with significant amount of time and monetary investment. Thus a scoping tool, referred to as the Acceptability Envelope, was developed to screen preliminary candidate media and storage vessel designs, identifying the range of chemical, physical and geometrical parameters for the coupled media and storage vessel system that allow it to meet performance targets. The model which underpins the analysis allows simplifying the storage system, thus resulting in one input-one output scheme, by grouping of selected quantities. Two cases have been analyzed and results are presented here. In the first application the DOE technical targets (Year 2010, Year 2015 and Ultimate) are used to determine the range of parameters required for the metal hydride media and storage vessel. In the second case the most promising metal hydrides available are compared, highlighting the potential of storage systems, utilizing them, to achieve 40% of the 2010 DOE technical target. Results show that systems based on Li-Mg media have the best potential to attain these performance targets.

  13. Waste acceptance criteria for the Waste Isolation Pilot Plant

    SciTech Connect (OSTI)

    NONE

    1996-04-01

    The Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), DOE/WIPP-069, was initially developed by a U.S. Department of Energy (DOE) Steering Committee to provide performance requirements to ensure public health and safety as well as the safe handling of transuranic (TRU) waste at the WIPP. This revision updates the criteria and requirements of previous revisions and deletes those which were applicable only to the test phase. The criteria and requirements in this document must be met by participating DOE TRU Waste Generator/Storage Sites (Sites) prior to shipping contact-handled (CH) and remote-handled (RH) TRU waste forms to the WIPP. The WIPP Project will comply with applicable federal and state regulations and requirements, including those in Titles 10, 40, and 49 of the Code of Federal Regulations (CFR). The WAC, DOE/WIPP-069, serves as the primary directive for assuring the safe handling, transportation, and disposal of TRU wastes in the WIPP and for the certification of these wastes. The WAC identifies strict requirements that must be met by participating Sites before these TRU wastes may be shipped for disposal in the WIPP facility. These criteria and requirements will be reviewed and revised as appropriate, based on new technical or regulatory requirements. The WAC is a controlled document. Revised/changed pages will be supplied to all holders of controlled copies.

  14. Comparison of the Acceptability of Various Oil Shale Processes

    SciTech Connect (OSTI)

    Burnham, A K; McConaghy, J R

    2006-03-11

    While oil shale has the potential to provide a substantial fraction of our nation's liquid fuels for many decades, cost and environmental acceptability are significant issues to be addressed. Lawrence Livermore National Laboratory (LLNL) examined a variety of oil shale processes between the mid 1960s and the mid 1990s, starting with retorting of rubble chimneys created from nuclear explosions [1] and ending with in-situ retorting of deep, large volumes of oil shale [2]. In between, it examined modified-in-situ combustion retorting of rubble blocks created by conventional mining and blasting [3,4], in-situ retorting by radio-frequency energy [5], aboveground combustion retorting [6], and aboveground processing by hot-solids recycle (HRS) [7,8]. This paper reviews various types of processes in both generic and specific forms and outlines some of the tradeoffs for large-scale development activities. Particular attention is given to hot-recycled-solids processes that maximize yield and minimize oil shale residence time during processing and true in-situ processes that generate oil over several years that is more similar to natural petroleum.

  15. DWPF COAL CARBON WASTE ACCEPTANCE CRITERIA LIMIT EVALUATION

    SciTech Connect (OSTI)

    Lambert, D.; Choi, A.

    2010-06-21

    A paper study was completed to assess the impact on the Defense Waste Processing Facility (DWPF)'s Chemical Processing Cell (CPC) acid addition and melter off-gas flammability control strategy in processing Sludge Batch 10 (SB10) to SB13 with an added Fluidized Bed Steam Reformer (FBSR) stream and two Salt Waste Processing Facility (SWPF) products (Strip Effluent and Actinide Removal Stream). In all of the cases that were modeled, an acid mix using formic acid and nitric acid could be achieved that would produce a predicted Reducing/Oxidizing (REDOX) Ratio of 0.20 Fe{sup +2}/{Sigma}Fe. There was sufficient formic acid in these combinations to reduce both the manganese and mercury present. Reduction of manganese and mercury are both necessary during Sludge Receipt and Adjustment Tank (SRAT) processing, however, other reducing agents such as coal and oxalate are not effective in this reduction. The next phase in this study will be experimental testing with SB10, FBSR, and both SWPF simulants to validate the assumptions in this paper study and determine whether there are any issues in processing these streams simultaneously. The paper study also evaluated a series of abnormal processing conditions to determine whether potential abnormal conditions in FBSR, SWPF or DWPF would produce melter feed that was too oxidizing or too reducing. In most of the cases that were modeled with one parameter at its extreme, an acid mix using formic acid and nitric acid could be achieved that would produce a predicted REDOX of 0.09-0.30 (target 0.20). However, when a run was completed with both high coal and oxalate, with minimum formic acid to reduce mercury and manganese, the final REDOX was predicted to be 0.49 with sludge and FBSR product and 0.47 with sludge, FBSR product and both SWPF products which exceeds the upper REDOX limit.

  16. Shape-memory transformations of NiTi: Minimum-energy pathways...

    Office of Scientific and Technical Information (OSTI)

    Report Number(s): IS-J--8495 Journal ID: ISSN 0031-9007; PRLTAO GrantContract Number: AC02-07CH11358 Type: Accepted Manuscript Journal Name: Physical Review Letters Additional ...

  17. Expedited site characterization (ESC) using the M{sup 3} approach, M{sup 3} = massive, moderate, minimum

    SciTech Connect (OSTI)

    Tindall, S.

    1995-12-31

    The main objective of this approach is to quickly and cost effectively identify and classify potential Areas of Concern (AOCS) as clean or contaminated, thus allowing potentially responsible parties (PRPS) to save limited resources by ceasing costly investigations and undertaking removal type actions expeditiously. The ESC M{sup 3} approach also overcomes the high degree of uncertainty typically associated with traditional site investigations resulting from a lack of comprehensive scoping. Thus, EPA Region 9 has agreed to accept and use, for risk assessment purposes, the data generated from the ESC M{sup 3} approach, providing the data quality is known and confirmation analyses are performed. The extraordinary benefit will be to eliminate any further action on those AOCs found to be clean using this approach. Finally this approach reduces the large number of non-detect samples that are customarily submitted for CLP-type (i.e., Contract Laboratory Program) analyses. The ESC M{sup 3} approach consists of the following three steps: (1) a massive sampling effort is first conducted at an AOC (e.g., 200 samples are collected using a grid approach); the samples are analyzed on a daily basis using real time onsite methods and field screening (FS)-type data are generated; (2) a moderate sampling effort is then conducted to provide onsite verification of the FS-type data; the samples are analyzed using onsite CLP-type methods and field quantitation (FQ)-type data are generated with an agreed upon level of QC; and finally, (3) a minimum sampling effort is conducted to provide verification of the FQ-type data; these confirmation samples are sent to an offsite laboratory for analysis, and CLP-type data are generated.

  18. ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS

    SciTech Connect (OSTI)

    Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

    2011-12-05

    Evaluation of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. Of the opportunities, a focus area related to optimizing the equipment and efficiency of the sample turnaround time for DWPF Analytical Laboratory was identified. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) evaluated the possibility of using an Isolok{reg_sign} sampling valve as an alternative to the Hydragard{reg_sign} valve for taking process samples. Previous viability testing was conducted with favorable results using the Isolok sampler and reported in SRNL-STI-2010-00749 (1). This task has the potential to improve operability, reduce maintenance time and decrease CPC cycle time. This report summarizes the results from acceptance testing which was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 (2) and which was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNL-RP-2011-00145 (3). The Isolok to be tested is the same model which was tested, qualified, and installed in the Sludge Receipt Adjustment Tank (SRAT) sample system. RW-0333P QA requirements apply to this task. This task was to qualify the Isolok sampler for use in the DWPF Slurry Mix Evaporator (SME) sampling process. The Hydragard, which is the current baseline sampling method, was used for comparison to the Isolok sampling data. The Isolok sampler is an air powered grab sampler used to 'pull' a sample volume from a process line. The operation of the sampler is shown in Figure 1. The image on the left shows the Isolok's spool extended into the process line and the image on the right shows the sampler retracted and then dispensing the liquid into the sampling container. To determine tank homogeneity, a Coliwasa sampler was used to grab samples at a high and low location within the mixing tank. Data from the two locations

  19. Point sensitive NMR imaging system using a magnetic field configuration with a spatial minimum

    DOE Patents [OSTI]

    Eberhard, P.H.

    A point-sensitive NMR imaging system in which a main solenoid coil produces a relatively strong and substantially uniform magnetic field and a pair of perturbing coils powered by current in the same direction superimposes a pair of relatively weak perturbing fields on the main field to produce a resultant point of minimum field strength at a desired location in a direction along the Z-axis. Two other pairs of perturbing coils superimpose relatively weak field gradients on the main field in directions along the X- and Y-axes to locate the minimum field point at a desired location in a plane normal to the Z-axes. An rf generator irradiates a tissue specimen in the field with radio frequency energy so that desired nuclei in a small volume at the point of minimum field strength will resonate.

  20. Point sensitive NMR imaging system using a magnetic field configuration with a spatial minimum

    DOE Patents [OSTI]

    Eberhard, Philippe H.

    1985-01-01

    A point-sensitive NMR imaging system (10) in which a main solenoid coil (11) produces a relatively strong and substantially uniform magnetic field and a pair of perturbing coils (PZ1 and PZ2) powered by current in the same direction superimposes a pair of relatively weak perturbing fields on the main field to produce a resultant point of minimum field strength at a desired location in a direction along the Z-axis. Two other pairs of perturbing coils (PX1, PX2; PY1, PY2) superimpose relatively weak field gradients on the main field in directions along the X- and Y-axes to locate the minimum field point at a desired location in a plane normal to the Z-axes. An RF generator (22) irradiates a tissue specimen in the field with radio frequency energy so that desired nuclei in a small volume at the point of minimum field strength will resonate.

  1. "Table A52. Nonswitchable Minimum Requirements and Maximum Consumption"

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Nonswitchable Minimum Requirements and Maximum Consumption" " Potential by Census Region, 1991" " (Estimates in Physical Units)" ,,,,"RSE" ,"Actual","Minimum","Maximum","Row" "Type of Energy","Consumption","Consumption(a)","Consumption(b)","Factors" "RSE Column Factors:",1,1.2,0.8 ," Total United States" ,"-","-","-"

  2. Microsoft PowerPoint - Group B - Consumer Acceptance Report Out [Read-Only] [Compatibility Mode]

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY EV Everywhere Workshop July 30, 2012 Consumer Acceptance Group B' Consumer Acceptance Breakout Session #1 - Brainstorm Consumer Acceptance Barriers and Infrastructure Scenarios * Consumer Education/Emotion * Vehicle Exposure - butts in seats (ride & drive, car sharing, IT/phones, rental fleets) * Consumers understanding their needs * Range anxiety/opportunity * Customer Personal Value Proposition * Charging Exposure * Start small (battery size and charging level), move complicated *

  3. Wind Power Siting: Public Acceptance and Land Use; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Tegen, Suzanne

    2015-06-17

    Suzanne Tegen presented this information as part of the June 17, 2015 WINDExchange webinar: Overcoming Wind Siting Challenges III: Public Acceptance and Land Use. This presentation provides an overview of current NREL research related to wind energy deployment considerations, the DOE Wind Vision as it relates to public acceptance and land use, why public acceptance of wind power matters, where the U.S. wind resource is best, and how those rich resource areas overlay with population centers.

  4. Anthony Thomas accepts position of Chief Scientist and Theory Group Leader

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at Jefferson Lab | Jefferson Lab Anthony Thomas accepts position of Chief Scientist and Theory Group Leader at Jefferson Lab Dr. Anthony Thomas Dr. Anthony Thomas Anthony Thomas accepts position of Chief Scientist and Theory Group Leader at Jefferson Lab December 3, 2003 The Department of Energy's Thomas Jefferson National Accelerator Facility is pleased to announce that Dr. Anthony Thomas has accepted the position of Chief Scientist and Head of the Theory Group at Jefferson Lab. As Chief

  5. Use of acceptable knowledge to demonstrate TRAMPAC compliance

    SciTech Connect (OSTI)

    Whitworth, J. (Julia); Becker, B. (Blair); Guerin, D. (David); Shokes, T. (Tamara)

    2004-01-01

    Recently, Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) has supported the Central Characterization Project (CCP) managed by the U.S. Department of Energy (DOE) in the shipment of transuranic (TRU) waste from various small-quantity TRU waste generators to hub sites or other DOE sites in TRUPACT-II shipping containers. This support has involved using acceptable knowledge (AK) to demonstrate compliance with various requirements of Revision 19 of the TRUPACT-II Authorized Methods of Payload Compliance (TRAMPAC). LANL-CO has worked to facilitate TRUPACT-II shipments from the University of Missouri Research Reactor (MURR) and Lovelace Respiratory Research Institute (LRRI) to Argonne National Laboratory-East (ANL-E) and Los Alamos National Laboratory (LANL), respectively. The latter two sites have TRU waste certification programs approved to ship waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In each case, AK was used to satisfy the necessary information to ship the waste to other DOE facilities. For the purposes of intersite shipment, AK provided data to WIPP Waste Information System (WWIS) transportation modules to ensure that required information was obtained prior to TRUPACT-II shipments. The WWIS modules were used for the intersite shipments, not to enter certification data into WWIS, but rather to take advantage of a validated system to ensure that the containers to be shipped were compliant with TRAMPAC requirements, particularly in the evaluation of quantitative criteria. LANL-CO also assisted with a TRAMPAC compliance demonstration for homogeneous waste containers shipped in TRUPACT-II containers from ANL-E to Idaho National Engineering and Environmental Laboratory (INEEL) for the purpose of core sampling. The basis for the TRAMPAC compliance determinations was AK regarding radiological composition, chemical composition, TRU waste container packaging, and absence of prohibited items. Also, even in the case where AK is not used to

  6. EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop: Charging Infrastructure Group E Breakout Report

    Broader source: Energy.gov [DOE]

    Breakout session presentation for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

  7. Systems acceptance and operability testing for rotary mode core sampling in flammable gas tanks

    SciTech Connect (OSTI)

    Corbett, J.E., Westinghouse Hanford

    1996-07-29

    This document provides instructions for the system acceptance and operability testing of the rotary mode core sampling system, modified for use in flammable gas tanks.

  8. Social Acceptance of Wind Power in the United States: Evaluating Stakeholder Perspectives (Poster)

    SciTech Connect (OSTI)

    Tegen, S.; Lantz, E.

    2009-05-01

    As the wind industry strives to achieve 20% wind energy by 2030, maintaining high levels of social acceptance for wind energy will become increasingly important. Wind Powering America is currently researching stakeholder perspectives in the U.S. market and reviewing findings from wind energy projects around the world to better understand social acceptance barriers. Results from European studies show that acceptance varies widely depending on local community values. A preliminary survey shows similar results in the United States. Further research will be conducted to refine our understanding of key social acceptance barriers and evaluate the best ways to mitigate negative perspectives on wind power.

  9. EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Attendence List

    Broader source: Energy.gov [DOE]

    Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

  10. ASHRAE Minimum Efficiency Requirements Tables for Heating and Cooling Product Categories

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) created tables that mirror American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 90.1-2013 tables, which include minimum efficiency requirements for FEMP-designated and ENERGY STAR-qualified heating and cooling product categories. Download the tables below to incorporate FEMP and ENERGY STAR purchasing requirements into federal product acquisition documents.

  11. Project W-151 flexible receiver radiation detector system acceptance test plan. Revision 1

    SciTech Connect (OSTI)

    Troyer, G.L.

    1994-12-06

    The attached document is the Acceptance Test Plan for the portion of Project W-151 dealing with acceptance of gamma-ray detectors and associated electronics manufactured at the Idaho National Engineering Laboratory (INEL). The document provides a written basis for testing the detector system, which will take place in the 305 building (300 Area).

  12. Minimum activation martensitic alloys for surface disposal after exposure to neutron flux

    DOE Patents [OSTI]

    Lechtenberg, Thomas

    1985-01-01

    Steel alloys for long-term exposure to neutron flux have a martensitic microstructure and contain chromium, carbon, tungsten, vanadium and preferably titanium. Activation of the steel is held to within acceptable limits for eventual surface disposal by stringently controlling the impurity levels of Ni, Mo, Cu, N, Co, Nb, Al and Mn.

  13. THE TURBULENT CASCADE AND PROTON HEATING IN THE SOLAR WIND DURING SOLAR MINIMUM

    SciTech Connect (OSTI)

    Coburn, Jesse T.; Smith, Charles W.; Vasquez, Bernard J.; Stawarz, Joshua E.; Forman, Miriam A. E-mail: Charles.Smith@unh.edu E-mail: Joshua.Stawarz@Colorado.edu

    2012-08-01

    The recently protracted solar minimum provided years of interplanetary data that were largely absent in any association with observed large-scale transient behavior on the Sun. With large-scale shear at 1 AU generally isolated to corotating interaction regions, it is reasonable to ask whether the solar wind is significantly turbulent at this time. We perform a series of third-moment analyses using data from the Advanced Composition Explorer. We show that the solar wind at 1 AU is just as turbulent as at any other time in the solar cycle. Specifically, the turbulent cascade of energy scales in the same manner proportional to the product of wind speed and temperature. Energy cascade rates during solar minimum average a factor of 2-4 higher than during solar maximum, but we contend that this is likely the result of having a different admixture of high-latitude sources.

  14. Estimate of Technical Potential for Minimum Efficiency Performance Standards in 13 Major World Economies

    SciTech Connect (OSTI)

    Letschert, Virginie; Desroches, Louis-Benoit; Ke, Jing; McNeil, Michael

    2012-07-01

    As part of the ongoing effort to estimate the foreseeable impacts of aggressive minimum efficiency performance standards (MEPS) programs in the worlds major economies, Lawrence Berkeley National Laboratory (LBNL) has developed a scenario to analyze the technical potential of MEPS in 13 major economies around the world1 . The best available technology (BAT) scenario seeks to determine the maximum potential savings that would result from diffusion of the most efficient available technologies in these major economies.

  15. Incorporate Minimum Efficiency Requirements for Heating and Cooling Products into Federal Acquisition Documents

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) organized information about FEMP-designated and ENERGY STAR-qualified heating, ventilating, and air conditioning (HVAC) and water heating products into tables that mirror American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 90.1-2013 minimum efficiency requirement tables. Federal buyers can use these tables as a reference and to incorporate the proper purchasing requirements set by FEMP and ENERGY STAR into federal acquisition documents.

  16. A new look at maximum and minimum temperature trends for the globe

    SciTech Connect (OSTI)

    Easterling, D.R.; Peterson, T.C.; Karl, T.R.

    1997-11-01

    A number of recent studies have established that differential changes in daily maximum and minimum temperatures are occurring, resulting in changes in the diurnal temperature range (DTR) for many parts of the globe. Large-scale trends in the USA indicate that minimum temperatures are increasing at a faster rate than maximum temperatures, resulting in a narrowing in the DTR. This paper updates and extends the analysis of changes in the DTR in three ways: (1) by increasing the areal coverage to more than half the global landmass, (2) by addressing the issue of homogeneity of the data, and (3) by examining the potential effects of urban stations on the calculated trends. The update includes data for an additional 15% of the global land area and an extension of the analysis period used in a previous study. Homogeneity techniques were used on the data to adjust individual station data for undocumented discontinuities. Annual maximum and minimum temperature and DTR time series for the 1950-1993 period averaged over 54% of the total global land area are presented. The trend for the maximum temperature is 0.88 C/100 years, which is consistent with earlier findings. However, the trend for the minimum temperature is 1.86 C/100 years; this is less than found in previous analyses and leads to a smaller trend in the DTR. This finding is not surprising since much of the data added in this study are for tropical and sub-tropical regions where temperature trends are not expected to be as large as in higher latitude regions. The effect of urbanization on the global trends is found to be on the order of 0.1 C/100 years or less, which is consistent with previous investigations. 14 refs., 2 figs.

  17. Waste Acceptance Testing of Secondary Waste Forms: Cast Stone, Ceramicrete and DuraLith

    SciTech Connect (OSTI)

    Mattigod, Shas V.; Westsik, Joseph H.; Chung, Chul-Woo; Lindberg, Michael J.; Parker, Kent E.

    2011-08-12

    To support the selection of a waste form for the liquid secondary wastes from WTP, Washington River Protection Solutions has initiated secondary-waste-form testing work at Pacific Northwest National Laboratory (PNNL). In anticipation of a down-selection process for a waste form for the Solidification Treatment Unit to be added to the ETF, PNNL is conducting tests on four candidate waste forms to evaluate their ability to meet potential waste acceptance criteria for immobilized secondary wastes that would be placed in the IDF. All three waste forms demonstrated compressive strengths above the minimum 3.45 MPa (500 psi) set as a target for cement-based waste forms. Further, none of the waste forms showed any significant degradation in compressive strength after undergoing thermal cycling (30 cycles in a 10 day period) between -40 C and 60 C or water immersion for 90 days. The three leach test methods are intended to measure the diffusion rates of contaminants from the waste forms. Results are reported in terms of diffusion coefficients and a leachability index (LI) calculated based on the diffusion coefficients. A smaller diffusion coefficient and a larger LI are desired. The NRC, in its Waste Form Technical Position (NRC 1991), provides recommendations and guidance regarding methods to demonstrate waste stability for land disposal of radioactive waste. Included is a recommendation to conduct leach tests using the ANS 16.1 method. The resulting leachability index (LI) should be greater than 6.0. For Hanford secondary wastes, the LI > 6.0 criterion applies to sodium leached from the waste form. For technetium and iodine, higher targets of LI > 9 for Tc and LI > 11 for iodine have been set based on early waste-disposal risk and performance assessment analyses. The results of these three leach tests conducted for a total time between 11days (ASTM C1308) to 90 days (ANS 16.1) showed: (1) Technetium diffusivity: ANSI/ANS 16.1, ASTM C1308, and EPA 1315 tests indicated that

  18. Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

    SciTech Connect (OSTI)

    Dilger, Fred; Halstead, Robert J.; Ballard, James D.

    2012-07-01

    Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's

  19. Multi-discipline Waste Acceptance Process at the Nevada National Security Site - 13573

    SciTech Connect (OSTI)

    Carilli, Jhon T.; Krenzien, Susan K.

    2013-07-01

    The Nevada National Security Site low-level radioactive waste disposal facility acceptance process requires multiple disciplines to ensure the protection of workers, the public, and the environment. These disciplines, which include waste acceptance, nuclear criticality, safety, permitting, operations, and performance assessment, combine into the overall waste acceptance process to assess low-level radioactive waste streams for disposal at the Area 5 Radioactive Waste Management Site. Four waste streams recently highlighted the integration of these disciplines: the Oak Ridge Radioisotope Thermoelectric Generators and Consolidated Edison Uranium Solidification Project material, West Valley Melter, and classified waste. (authors)

  20. Acceptance of waste for disposal in the potential United States repository at Yucca Mountain, Nevada

    SciTech Connect (OSTI)

    Stahl, D.; Svinicki, K.

    1996-07-01

    This paper addresses the process for the acceptance of waste into the waste management system (WMS) with a focus on the detailed requirements identified from the Waste Acceptance System Requirements Document. Also described is the recent dialogue between OCRWM and the Office of Environmental Management to resolve issues, including the appropriate interpretation and application of regulatory and system requirements to DOE-owned spent fuel. Some information is provided on the design of the repository system to aid the reader in understanding how waste that is accepted into the WMS is received and emplaced in the repository.

  1. Applications are now being accepted for the Broader Engagement Program at

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SC14 are now being accepted for the Broader Engagement Program at SC14 Applications are now being accepted for the Broader Engagement Program at SC14 May 5, 2014 by Richard Gerber Applications are now being accepted for the Broader Engagement (BE) Program at SC14, which will be held in New Orleans from November 16-21, 2014. The BE Program is designed to diversify the pool of talent in high-performance computing (HPC) by introducing, engaging, and supporting students and professionals

  2. ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality...

    Broader source: Energy.gov (indexed) [DOE]

    a 50% reduction in building energy consumption. ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings (890.97 KB) More Documents & ...

  3. Acceptance and operability test report for the 327 building retention process sewer diverter station

    SciTech Connect (OSTI)

    Olander, A.R.

    1996-09-04

    This test report includes the results of acceptance and operability testing of the 327 building diverter station. The test included steps for flushing, calibrating, and operating the system on backup power.

  4. Acceptance {ampersand} operability test report for the 324 building retention process sewer diverter station

    SciTech Connect (OSTI)

    Olander, A.R.

    1996-09-04

    This test report includes the results of acceptance and operability testing of the 324 building diverter station. The test included steps for flushing, calibrating, and operating the system on backup power.

  5. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  6. Supervisory Control and Data Acquisition System (SCADA) Substation C3-3 Acceptance Test Procedure

    SciTech Connect (OSTI)

    ZAKRAJSEK, M.F.

    2000-10-17

    The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.