Powered by Deep Web Technologies
Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Hydropower to Hydrogen: Feasibility Study  

Science Conference Proceedings (OSTI)

Hydrogen is being considered as a transportation fuel of the future due to its abundance in nature and the many different methods available to produce it. Hydrogen is also the cleanest burning of all fuels available today. However, there is limited infrastructure available to support the use of hydrogen as an alternative fuel for land transportation. In order to promote hydrogen as an alternative transportation fuel, the New York Power Authority (NYPA) commissioned EPRI/Nexant to conduct a feasibility st...

2007-06-13T23:59:59.000Z

2

Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development  

Open Energy Info (EERE)

Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development Jump to: navigation, search Logo: Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development Name Indonesia-GTZ Mini-Hydropower Schemes for Sustainable Economic Development Agency/Company /Organization Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Partner on behalf of Bundesministerium für Wirtschaftliche Zusammenarbeit und Entwicklung (BMZ); Directorate General for International Cooperation (DGIS Niederlande) Sector Energy Topics Background analysis Website http://www.gtz.de/en/themen/16 Program Start 1999 Program End 2008 Country Indonesia UN Region South-Eastern Asia References Mini-Hydropower Schemes for Sustainable Economic Development[1]

3

Joint irrigation districts hydropower assessment study. Final feasibility assessment report. Volume I  

DOE Green Energy (OSTI)

In August 1978, the United States Department of Energy and the Turlock Irrigation District entered into a cooperative agreement for a Joint District's Low-Head Hydropower Assessment Study. The purpose of the agreement was to carry out a study of the hydropower potential at sites within the borders of the Turlock, Merced, South San Joaquin, and Oakdale Irrigation Districts in California. The required data were gathered and analyzed. The results of this study indicate the total potential small hydropower capacity with the Joint Districts is 19,560 kW installed with an annual energy generation of 68,561,800 kWh. This is equivalent to oil-savings of 118,616 barrels per y.

None

1979-02-01T23:59:59.000Z

4

Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts  

DOE Green Energy (OSTI)

Five existing dams along a 6.5-mile reach of the Mill River in the City of Northampton, Massachusetts were studied to assess the feasibility of developing the sites for low-head hydroelectric power generation. Each of the dams was inspected to evaluate existing conditions and necessary work required to rehabilitate the structures. Analyses of hydrology and power potential were carried out and a packaged tube turbine-generator unit was found to be suitable for installation at all sites. Project layouts were developed making maximum use of existing structures and natural and man-made features. Capital and operation and maintenance costs were estimated based on the project layouts and the selected turbine-generator units. Financial analyses were performed using a set of baseline assumptions. Sensitivity tests of alternative assumptions were also prepared, along with analyses of assistance program alternatives. Finally, the legal, environmental, and socio-institutional considerations affecting development of the hydro projects were identified and reviewed. Hydro developments on the Mill River were found to be technically feasible, presenting no extraordinary engineering, environmental, or legal problems. However, none of these projects, either individually or jointly, would be financially feasible without substantial assistance in the form of capital grants.

None

1979-01-01T23:59:59.000Z

5

Department of Energy Small-Scale Hydropower Program: Feasibility assessment and technology development summary report  

DOE Green Energy (OSTI)

This report summarizes two subprograms under the US Department of Energy's Small-Scale Hydroelectric Power Program. These subprograms were part of the financial assistance activities and included the Program Research and Development Announcement (PRDA) feasibility assessments and the technology development projects. The other major subprograms included engineering research and development, legal and institutional aspects, and technology transfer. These other subprograms are covered in their respective summary reports. The problems of energy availability and increasing costs of energy led to a national effort to develop economical and environmental attractive alternative energy resources. One such alternative involved the utilization of existing dams with hydraulic heads of <65 ft and the capacity to generate hydroelectric power of 15 MW or less. Thus, the PRDA program was initiated along with the Technology Development program. The purpose of the PRDA feasibility studies was to encourage development of renewable hydroelectric resources by providing engineering, economic, environmental, safety, and institutional information. Fifty-five feasibility studies were completed under the PRDA. This report briefly summarizes each of those projects. Many of the PRDA projects went on to become technology development projects. 56 refs., 1 fig., 2 tabs.

Rinehart, B.N.

1991-06-01T23:59:59.000Z

6

Department of Energy Small-Scale Hydropower Program: Feasibility assessment and technology development summary report  

Science Conference Proceedings (OSTI)

This report summarizes two subprograms under the US Department of Energy's Small-Scale Hydroelectric Power Program. These subprograms were part of the financial assistance activities and included the Program Research and Development Announcement (PRDA) feasibility assessments and the technology development projects. The other major subprograms included engineering research and development, legal and institutional aspects, and technology transfer. These other subprograms are covered in their respective summary reports. The problems of energy availability and increasing costs of energy led to a national effort to develop economical and environmental attractive alternative energy resources. One such alternative involved the utilization of existing dams with hydraulic heads of hydroelectric power of 15 MW or less. Thus, the PRDA program was initiated along with the Technology Development program. The purpose of the PRDA feasibility studies was to encourage development of renewable hydroelectric resources by providing engineering, economic, environmental, safety, and institutional information. Fifty-five feasibility studies were completed under the PRDA. This report briefly summarizes each of those projects. Many of the PRDA projects went on to become technology development projects. 56 refs., 1 fig., 2 tabs.

Rinehart, B.N.

1991-06-01T23:59:59.000Z

7

Hydropower Resources  

Energy.gov (U.S. Department of Energy (DOE))

Hydropower is used throughout the United States, but it is most common on the west coastespecially in the northwest. Although most of the best hydropower production sites have already been...

8

Energy Basics: Hydropower Resources  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Basics Renewable Energy Printable Version Share this resource Biomass Geothermal Hydrogen Hydropower Large-Scale Hydropower Microhydropower Hydropower Resources...

9

Energy Basics: Hydropower Technologies  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Basics Renewable Energy Printable Version Share this resource Biomass Geothermal Hydrogen Hydropower Large-Scale Hydropower Microhydropower Hydropower Resources...

10

Hydropower Technologies  

Energy.gov (U.S. Department of Energy (DOE))

Hydropower, or hydroelectric power, is the most common and least expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than...

11

Idaho National Laboratory - Hydropower Program- Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Virtual Hydropower Prospector do Brasil Access the Virtual Hydropower Prospector do Brasil Disclaimers NOTICE TO USERS The water energy resource and potential project information...

12

Virtual Hydropower Prospecting Searching for Hydropower Gold  

DOE Green Energy (OSTI)

The availability of geographic information system (GIS) tools and analytical modeling of natural streams has made it possible to perform virtual river inventories that were formerly done using topographic maps, stream flow estimates, and physical reconnaissance. The Idaho National Laboratory (INL) in collaboration with the U.S. Geological Survey (USGS) virtually assessed the gross power potential of all natural streams in the United States of America and identified feasible potential project sites and estimated their developable power potential. The results of this virtual prospecting have been incorporated into a GIS application called the Virtual Hydropower Prospector that is available for public use on the Internet.

Douglas G. Hall

2007-12-01T23:59:59.000Z

13

Hydropower Technologies | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Technologies Hydropower Technologies August 14, 2013 - 3:03pm Addthis Photo of the reservoir in front of a hydropower dam. Hydropower, or hydroelectric power, is the...

14

Hydropower Technology Roundup Report  

Science Conference Proceedings (OSTI)

This report provides a preliminary examination of the practices and problems associated with trash and debris at hydropower installations. The Hydropower Technology Roundup project surveyed the perspectives of multiple hydropower producers with respect to their management of trash and debris.

2007-03-26T23:59:59.000Z

15

Hydropower Appropriations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Marketing Administration Other Agencies You are here Home Hydropower Appropriations Hydropower Appropriations List of projects selected focusing on updating...

16

Idaho National Laboratory - Hydropower Program - Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho National Laboratory is operated for the U.S. Department of Energy's Office of Nuclear Energy by Battelle Energy Alliance. Home Renewable Energy Hydropower ...

17

Idaho National Laboratory - Hydropower Program- Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Sources Feature Set Source Vintage URL Water Energy Resource Sites (All) Idaho National Laboratory 2004 http:hydropower.inl.govresourceassessment Resource Assessment...

18

Idaho National Laboratory - Hydropower Program- Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

The water energy resource and potential project information provided by the Virtual Hydropower Prospector (VHP) is as accurate as possible within the limitations of the...

19

Energy Basics: Large-Scale Hydropower  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Basics Renewable Energy Printable Version Share this resource Biomass Geothermal Hydrogen Hydropower Large-Scale Hydropower Microhydropower Hydropower Resources...

20

Idaho National Laboratory - Hydropower Program - Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Evaluation Software State Resource Assessments Resource Assessments Reports Technology Transfer Virtual Hydropower Prospector Virtual Hydropower Prospector do Brasil...

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Hydropower potential in Turkey  

Science Conference Proceedings (OSTI)

Turkey has a total hydropower potential of 433 GW that is equal to 1.2% of the total hydropower potential of the world and to 14% of European hydropower potential. Only 125 GW of the total hydroelectric potential of Turkey can be economically used. By the commissioning of new hydropower plants, which are under construction, 34% of the economically usable potential of the country would be tapped. At the present, hydropower energy is an important energy source for Turkey due to its useful characteristics such as being renewable, clean, and less of an impact on the environment, and a cheap and domestic energy source.

Kaygusuz, K. [Karadeniz Technical Univ., Trabzon (Turkey). Dept. of Chemistry

1999-08-01T23:59:59.000Z

22

Commonwealth Hydropower Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commonwealth Hydropower Program Commonwealth Hydropower Program Commonwealth Hydropower Program < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit State Government Tribal Government Savings Category Water Buying & Making Electricity Home Weatherization Maximum Rebate Design and Construction: $600,000 Feasibility study: $40,000 Program Info Funding Source Massachusetts Renewable Energy Trust Start Date 09/2009 State Massachusetts Program Type State Grant Program Rebate Amount Design and Construction: 50% of costs or $1.00 per incremental kWh per year Feasibility study: 80% of costs Provider Massachusetts Clean Energy Center Note: This program reopened March 15, 2013. There is $1,200,000 available for Round 5; applications will be accepted on a rolling basis until funding

23

Hydropower Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Resources Hydropower Resources August 16, 2013 - 4:06pm Addthis Hydropower is used throughout the United States, but it is most common on the west coast-especially in...

24

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Nuclear Energy by Battelle Energy Alliance. Home Renewable Energy Hydropower What's New New Features Virtual Hydropower Prospector do Basil, Version 1.0 A GIS...

25

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Evaluation Software To assess the hydropower potential in any area of the United States from a national perspective, a uniform set of criteria was developed and a...

26

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Army Corps of Engineers Bureau of Reclamation Bureau of Land Management National Hydropower Association Low Impact Hydropower Institute Conservation Biology Institute Tools &...

27

National Hydropower Association conference proceedings  

Science Conference Proceedings (OSTI)

These proceedings collect papers on hydroelectricity. Topics include legal developments in hydropower regulation, an overview of the small hydro industry, and financing hydropower projects.

Not Available

1985-01-01T23:59:59.000Z

28

& CONSUMPTION US HYDROPOWER PRODUCTION  

E-Print Network (OSTI)

12% of the nation's electricity. Hydropower produces more than 90,000 megawatts of electricity, which is enough to meet the needs of 28.3 million consumers. Hydropower accounts for over 90% of all electricity the NAO. ENERGY CONSUMPTION AND PRODUCTION IN NORWAY AND THE NAO The demand for heating oil in Norway

29

Conventional Hydropower Technologies (Fact Sheet)  

DOE Green Energy (OSTI)

This fact sheet describes the DOE Water Power Program's conventional hydropower research and development efforts.

Not Available

2011-07-01T23:59:59.000Z

30

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy's Office of Nuclear Energy by Battelle Energy Alliance. Home Renewable Energy Hydropower Hydropower Facts Hydropower: Partnership with the Environment...

31

Hydropower research and development  

DOE Green Energy (OSTI)

This report is a compilation of information on hydropower research and development (R and D) activities of the Federal government and hydropower industry. The report includes descriptions of on-going and planned R and D activities, 1996 funding, and anticipated future funding. Summary information on R and D projects and funding is classified into eight categories: fish passage, behavior, and response; turbine-related; monitoring tool development; hydrology; water quality; dam safety; operations and maintenance; and water resources management. Several issues in hydropower R and D are briefly discussed: duplication; priorities; coordination; technical/peer review; and technology transfer/commercialization. Project information sheets from contributors are included as an appendix.

NONE

1997-03-01T23:59:59.000Z

32

Energy Basics: Hydropower Resources  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on the west coast-especially in the northwest. Although most of the best hydropower production sites have already been developed, many more potential sites have not. Learn more...

33

Large-Scale Hydropower  

Energy.gov (U.S. Department of Energy (DOE))

Large-scale hydropower plants are generally developed to produce electricity for government or electric utility projects. These plants are more than 30 MW in size, and there is more than 80,000 MW...

34

Hydropower Reliability Study  

Science Conference Proceedings (OSTI)

Though hydroelectric plants are highly reliable, even a 1% improvement in their availability could save the U.S. utility industry $125 million per year. This comprehensive review of hydropower data and practices recommends ways to achieve such improvement.

1984-03-01T23:59:59.000Z

35

National Hydropower Association | Open Energy Information  

Open Energy Info (EERE)

by expanding it. National Hydropower Association is a company located in Washington, DC . References "National Hydropower Association" Retrieved from "http:...

36

hydropower | OpenEI  

Open Energy Info (EERE)

hydropower hydropower Dataset Summary Description No description given. Source National Renewable Energy Laboratory Date Released July 03rd, 2012 (2 years ago) Date Updated July 03rd, 2012 (2 years ago) Keywords biopower csp geothermal hydropower hydrothermal Renewable Energy Technical Potential rooftop United States utility-scale wind Data text/csv icon United States Renewable Energy Technical Potential (csv, 7.7 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote

37

Hydropower Technology Roundup Report  

Science Conference Proceedings (OSTI)

This report provides a round up of the background, development, discussions, and results from an EPRI-sponsored industry workshop, Hydropower in a Carbon-Constrained FutureOpportunities and Challenges. The workshop was held on January 30 31, 2008, at EPRI's Knoxville, Tennessee, offices.

2008-03-27T23:59:59.000Z

38

NREL: Learning - Pumped Hydropower  

NLE Websites -- All DOE Office Websites (Extended Search)

Pumped Hydropower Pumped Hydropower Pumped hydro facilities use off-peak electricity to pump water from a lower reservoir into one at a higher elevation. When the water stored in the upper reservoir is released, it is passed through hydraulic turbines to generate electricity. The off-peak electrical energy used to pump the water up hill can be stored indefinitely as gravitational energy in the upper reservoir. Thus, two reservoirs in combination can be used to store electrical energy for a long period of time, and in large quantities. Utilities generally prefer to operate large coal and nuclear power stations at full power all the time (referred to as "baseload generation"), so in the middle of the night, these plants often produce more power than is needed. Pumped hydro energy storage can be used to smooth out the demand

39

Conventional Hydropower Technologies (Fact Sheet)  

SciTech Connect

The US Department of Energy conducts research on conventional hydropower technologies to increase generation and improve existing means of generating hydroelectricity.

2010-07-01T23:59:59.000Z

40

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Report test Resource Assessment report (main) - PDF format Appendix A - Summary Report Appendix B - RIver Basins Report Appendix C - Site List Appendix D - Individual...

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

upon it's completion. If a state resource assessment report is needed please contact INL through the "Send Email" link. Contact: Hydropower, Send E-mail Last Updated: Tuesday,...

42

Large-Scale Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

hydropower projects can also be built as power storage facilities. During periods of peak electricity demand, these facilities operate much like a traditional hydropower...

43

Sustainable development of hydropower in third countries...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

&8220;Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development,...

44

Idaho National Laboratory - Hydropower Program: Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Nuclear Energy by Battelle Energy Alliance. Home Renewable Energy Hydropower Hydropower Document Archive The following reports, articles, and publications are...

45

Fact Sheet: Sustainable Development of Hydropower Initiative...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sustainable Development of Hydropower Initiative Fact Sheet: Sustainable Development of Hydropower Initiative A fact sheet detailling the mission behind the Clean Energy...

46

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Undeveloped Hydropower Potential by State The Department of Energy is performing a resource assessment of the undeveloped conventional hydropower potential in the U.S. (Undeveloped...

47

Small-Hydropower Development: The Process, Pitfalls, and Experience, Volume 3: Summary and Analysis of Technology Development Projects  

Science Conference Proceedings (OSTI)

With proper attention to specific site considerations, small hydropower development at existing dams and waterways is technically feasible. This conclusion, based on technical, economic, construction, and operations data from 23 small-hydro projects, represents the key finding in this third volume of a study conducted under the DOE National Small-Hydropower Program.

1987-09-25T23:59:59.000Z

48

Microsoft Word - FINAL Hydropower Conference Agenda 2009 060209...  

NLE Websites -- All DOE Office Websites (Extended Search)

Update Ted Coombes, SPRA - WRDA 2009 - Direct Funding - Federal Hydropower Appropriations - Wind Power Leveraging of Federal Hydropower Assets - Federal Hydropower's Place...

49

Hydropower Technology Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Technology Basics Hydropower Technology Basics Hydropower Technology Basics August 14, 2013 - 3:03pm Addthis Text Version Photo of the reservoir in front of a hydropower dam. Hydropower, or hydroelectric power, is the most common and least expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than 6% of the country's electricity was produced from hydropower resources in 2008, and about 70% of all renewable electricity generated in the United States came from hydropower resources. Hydropower technologies have a long history of use because of their many benefits, including high availability and lack of emissions. Hydropower technologies use flowing water to create energy that can be captured and turned into electricity. Both large and small-scale power

50

Hydropower Technology Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Technology Basics Hydropower Technology Basics Hydropower Technology Basics August 14, 2013 - 3:03pm Addthis Text Version Photo of the reservoir in front of a hydropower dam. Hydropower, or hydroelectric power, is the most common and least expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than 6% of the country's electricity was produced from hydropower resources in 2008, and about 70% of all renewable electricity generated in the United States came from hydropower resources. Hydropower technologies have a long history of use because of their many benefits, including high availability and lack of emissions. Hydropower technologies use flowing water to create energy that can be captured and turned into electricity. Both large and small-scale power

51

Ductless, Mini-Split Heat Pump Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ductless, Mini-Split Heat Pump Basics Ductless, Mini-Split Heat Pump Basics Ductless, Mini-Split Heat Pump Basics August 19, 2013 - 11:04am Addthis Ductless, mini-split-system heat pumps (mini splits), as their name implies, do not have ducts. Therefore, they make good retrofit add-ons to houses or buildings with "non-ducted" heating systems, such as hydronic (hot water heat), radiant panels, and space heaters (wood, kerosene, propane). They can also be a good choice for room additions, where extending or installing distribution ductwork is not feasible. How Ductless, Mini-Split Heat Pumps Work Like standard air-source heat pumps, mini splits have two main components: an outdoor compressor/condenser, and an indoor air-handling unit. A conduit, which houses the power cable, refrigerant tubing, suction tubing,

52

MiniDFT  

NLE Websites -- All DOE Office Websites (Extended Search)

MiniDFT MiniDFT MiniDFT Description MiniDFT is a plane-wave denstity functional theory (DFT) mini-app for modeling materials. Given an set of atomic coordinates and pseudopotentials, MiniDFT computes self-consistent solutions of the Kohn-Sham equations using either the LDA or PBE exchange-correlation functionals. For each iteration of the self-consistent field cycle, the Fock matrix is constructed and then diagonalized. To build the Fock matrix, Fast Fourier Transforms are used to tranform orbitals from the plane wave basis ( where the kinetic energy is most readily compted ) to real space (where the potential is evaluated ) and back. Davidson diagonalization is used to compute the orbital energies and update the orbital coefficients. The MiniDFT mini-app was excised from the general-purpose Quantum Espresso

53

Idaho National Laboratory - Hydropower Program: Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

Aspects General Environmental Research Hydrokinetic & Wave Technologies Hydropower Facts Research and Development Resource Assessment Technology Transfer Virtual...

54

Hydropower Resource Assessment Modeling Results  

DOE Green Energy (OSTI)

The Hydropower Evaluation Software uses the Federal Energy Regulatory Commission?s Hydroelectric Power Resource Assessment database to identify sites with undeveloped hydropower capacity and the estimated megawatts of undeveloped capacity at each site. The software integrates this information with environmental values from the National Park Service?s National Rivers Inventory database. Other constraints to development that are modeled include Federal and state legislative protection for river segments that have been identified as being wild and scenic river segments. River segments containing threatened and/or endangered wildlife and fish are also modeled for their influence on hydropower development. The amount that each attribute affects the likelihood of development is dependent on the prior development of a site.

A. M. Conner; J. E. Francfort

1999-07-06T23:59:59.000Z

55

DOE Hydropower Program Biennial Report for FY 2005-2006  

DOE Green Energy (OSTI)

SUMMARY The U.S. Department of Energy (DOE) Hydropower Program is part of the Office of Wind and Hydropower Technologies, Office of Energy Efficiency and Renewable Energy. The Program's mission is to conduct research and development (R&D) that will increase the technical, societal, and environmental benefits of hydropower. The Department's Hydropower Program activities are conducted by its national laboratories: Idaho National Laboratory (INL) [formerly Idaho National Engineering and Environmental Laboratory], Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and National Renewable Energy Laboratory (NREL), and by a number of industry, university, and federal research facilities. Programmatically, DOE Hydropower Program R&D activities are conducted in two areas: Technology Viability and Technology Application. The Technology Viability area has two components: (1) Advanced Hydropower Technology (Large Turbine Field Testing, Water Use Optimization, and Improved Mitigation Practices) and (2) Supporting Research and Testing (Environmental Performance Testing Methods, Computational and Physical Modeling, Instrumentation and Controls, and Environmental Analysis). The Technology Application area also has two components: (1) Systems Integration and Technology Acceptance (Hydro/Wind Integration, National Hydropower Collaborative, and Integration and Communications) and (2) Supporting Engineering and Analysis (Valuation Methods and Assessments and Characterization of Innovative Technology). This report describes the progress of the R&D conducted in FY 2005-2006 under all four program areas. Major accomplishments include the following: Conducted field testing of a Retrofit Aeration System to increase the dissolved oxygen content of water discharged from the turbines of the Osage Project in Missouri. Contributed to the installation and field testing of an advanced, minimum gap runner turbine at the Wanapum Dam project in Washington. Completed a state-of-the-science review of hydropower optimization methods and published reports on alternative operating strategies and opportunities for spill reduction. Carried out feasibility studies of new environmental performance measurements of the new MGR turbine at Wanapum Dam, including measurement of behavioral responses, biomarkers, bioindex testing, and the use of dyes to assess external injuries. Evaluated the benefits of mitigation measures for instream flow releases and the value of surface flow outlets for downstream fish passage. Refined turbulence flow measurement techniques, the computational modeling of unsteady flows, and models of blade strike of fish. Published numerous technical reports, proceedings papers, and peer-reviewed literature, most of which are available on the DOE Hydropower website. Further developed and tested the sensor fish measuring device at hydropower plants in the Columbia River. Data from the sensor fish are coupled with a computational model to yield a more detailed assessment of hydraulic environments in and around dams. Published reports related to the Virtual Hydropower Prospector and the assessment of water energy resources in the U.S. for low head/low power hydroelectric plants. Convened a workshop to consider the environmental and technical issues associated with new hydrokinetic and wave energy technologies. Laboratory and DOE staff participated in numerous workshops, conferences, coordination meetings, planning meetings, implementation meetings, and reviews to transfer the results of DOE-sponsored research to end-users.

Sale, Michael J [ORNL; Cada, Glenn F [ORNL; Acker, Thomas L. [Northern Arizona State University and National Renewable Energy Laboratory; Carlson, Thomas [Pacific Northwest National Laboratory (PNNL); Dauble, Dennis D. [Pacific Northwest National Laboratory (PNNL); Hall, Douglas G. [Idaho National Laboratory (INL)

2006-07-01T23:59:59.000Z

56

US hydropower resource assessment for Hawaii  

DOE Green Energy (OSTI)

US DOE is developing an estimate of the undeveloped hydropower potential in US. The Hydropower Evaluation Software (HES) is a computer model developed by INEL for this purpose. HES measures the undeveloped hydropower resources available in US, using uniform criteria for measurement. The software was tested using hydropower information and data provided by Southwestern Power Administration. It is a menu-driven program that allows the PC user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes, and generate reports. This report describes the resource assessment results for the State of Hawaii.

Francfort, J.E.

1996-09-01T23:59:59.000Z

57

Federal Memorandum of Understanding for Hydropower/Resources | Open Energy  

Open Energy Info (EERE)

Memorandum of Understanding for Hydropower/Resources Memorandum of Understanding for Hydropower/Resources < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources MOU Related Resources Hydropower Resources Assessment at Existing Reclamation Facilities An Assessment of Energy Potential at Non-Powered Dams in the United States Assessment of Potential Capacity Increases at Existing Hydropower Plants Site Inventory and Hydropower Energy Assessment of Reclamation Owned Conduits Potential Hydroelectric Development at Existing Federal Facilities Advanced Conventional Hydropower Planning and Operation Analysis Tools The Integrated Basin-Scale Opportunity Assessment Initiative, FY

58

US hydropower resource assessment for South Dakota  

SciTech Connect

A total of 33 sites have been identified and assessed for their hydropower potential. Information as to the potential megawatts of capacity for 4 of the sites was not available; however, these sites have been identified as having hydropower potential and are included in the group of 33. The Hydropower Evaluation Software results for site capacities range from 35 kilowatts to 234 megawatts. Most of the sites have potential capacities of under 1 megawatts. The unadjusted hydropower potential for South Dakota was identified as being 1,124 megawatts. The Hydropower Evaluation Software results lower this estimate 38% to 695 megawatts. The greatest reduction in undeveloped potential occurs at developed sites with current power production. These sites have a Hydropower Evaluation Software estimated capacity of 285 megawatts, a 50% reduction in capacity. The number of sites does not change, only the identified capacity is reassessed.

Francfort, J.E.

1993-12-01T23:59:59.000Z

59

Idaho National Laboratory - Hydropower Program: Research and...  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental problems associated with hydropower operations, such as providing safe fish passage and improved water quality, have received considerable attention in the past...

60

2011 Grants for Advanced Hydropower Technologies | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Manufacturing Facilities Wind Manufacturing Facilities Testing America's Wind Turbines Testing America's Wind Turbines U.S. Hydropower Potential from Existing Non-powered Dams...

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Click image to enlarge Picture: Top Hydroelectric Generating Countries Contact: Hydropower, Send E-mail Last Updated: Tuesday, December 05, 2006 Copyright 2013 Idaho...

62

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

How Hydropower Works The Hydrologic Cycle: Water constantly moves through a vast global cycle, in which it evaporates from lakes and oceans, forms clouds, precipitates as rain or...

63

Idaho National Laboratory - Hydropower Program - Annotated Bibliograph...  

NLE Websites -- All DOE Office Websites (Extended Search)

policy actions might be undertaken to address the needs discussed here. Contact: Hydropower, Send E-mail Last Updated: Monday, July 18, 2005 Copyright 2013 Idaho National...

64

Idaho National Laboratory - Hydropower Program: Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

NTIS Ordering Info The following are reports of interest to the hydropower industry, arranged by topic and chronologically with newest publications first. The reports with NTIS...

65

Relicensing and Environmental Issues Affecting Hydropower  

Reports and Publications (EIA)

This article presents an overview of the hydropower industry and summarizes two recent events that have greatly influenced relicensing and environmental issues.

Ronald S. Hankey

1998-04-01T23:59:59.000Z

66

Hydropower Resource Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

potential from the EERE Wind and Water Power Technologies Office. Addthis Related Articles Hydropower Technology Basics Glossary of Energy-Related Terms Microhydropower Basics...

67

Idaho National Laboratory - Hydropower Program - Annotated Bibliograph...  

NLE Websites -- All DOE Office Websites (Extended Search)

mitigation and other issues that affect hydropower development Development of unconventional technologies, such as low-headlow-power generating equipment that can be...

68

Hydropower, Wave and Tidal Technologies Available for ...  

Site Map; Printable Version; Share this resource. Send a link to Hydropower, Wave and Tidal Technologies Available for Licensing - Energy Innovation Portalto someone ...

69

Federal Energy Management Program: Hydropower and Ocean Energy Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower and Hydropower and Ocean Energy Resources and Technologies to someone by E-mail Share Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Facebook Tweet about Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Twitter Bookmark Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Google Bookmark Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Delicious Rank Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on Digg Find More places to share Federal Energy Management Program: Hydropower and Ocean Energy Resources and Technologies on AddThis.com... Energy-Efficient Products

70

Federal Memorandum of Understanding for Hydropower/Federal Inland  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Federal Memorandum of Understanding for Hydropower/Federal Inland Hydropower Working Group < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Federal Inland Hydropower Working Group The Federal Inland Hydropower Working Group is made up of 15 federal entities involved in the regulation, management, or development of hydropower resources (including hydrokinetics) in rivers and streams of the

71

Investments in Existing Hydropower Unlock More Clean Energy ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investments in Existing Hydropower Unlock More Clean Energy Investments in Existing Hydropower Unlock More Clean Energy August 14, 2013 - 2:21pm Addthis Tacoma Power's Cushman...

72

Small Hydropower Systems: Energy Efficiency and Renewable Energy Clearinghouse  

DOE Green Energy (OSTI)

This fact sheet introduces consumers to small hydropower systems, and includes information on how the systems work and how to assess a stream site for hydropower suitability.

Nachman-Hunt, N.

2001-07-05T23:59:59.000Z

73

Anfu Guanshan Hydropower Development Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Anfu Guanshan Hydropower Development Co Ltd Jump to: navigation, search Name Anfu Guanshan Hydropower Development Co.,Ltd Place Jiangxi Province, China Zip 343009 Sector Hydro...

74

Microsoft PowerPoint - Sadiki - SW Regional Hydropower Conference...  

NLE Websites -- All DOE Office Websites (Extended Search)

Operation Division Operation Division SOUTHWESTERN FEDERAL SOUTHWESTERN FEDERAL HYDROPOWER CONFERENCE HYDROPOWER CONFERENCE 12 June 2008 12 June 2008 USACE Cost Benchmarking...

75

Microsoft PowerPoint - MVD Hydrokinetics, SW Regional Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects on the Mississippi River Mississippi River Southwestern Federal Hydropower Conference 10 June 2010 Jeff Artman, P.E. MVD Hydropower Business Line Manager Line Manager...

76

Microsoft Word - FINAL 2010 Hydropower Conference Agenda 052610...  

NLE Websites -- All DOE Office Websites (Extended Search)

Update Ted Coombes, SPRA - WRDA 2010 - Direct Funding - Federal Hydropower Appropriations - Federal Hydropower's Place in Climate Change Legislation 3:15 p.m. BREAK 3:30...

77

Microsoft Word - Hydropower Conference Agenda 2007 053007.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Update Ted Coombes, SPRA - WRDA 2007 - Direct Funding - Federal Hydropower Appropriations - Federal Hydropower's Place in Climate Change Legislation 2:05 p.m. Southwestern...

78

Los Alamos County Completes Abiquiu Hydropower Project, Bringing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean...

79

User's Guide Virtual Hydropower Prospector Version 1.1  

Science Conference Proceedings (OSTI)

The Virtual Hydropower Prospector is a web-based geographic information system (GIS) application for displaying U.S. water energy resource sites on hydrologic region maps. The application assists the user in locating sites of interest and performing preliminary, development feasibility assessments. These assessments are facilitated by displaying contextual features in addition to the water energy resource sites such as hydrograpy, roads, power infrastructure, populated places, and land use and control. This guide provides instructions for operating the application to select what features are displayed and the extent of the map view. It also provides tools for selecting features of particular interest and displaying their attribute information.

Douglas G. Hall; Sera E. White; Julie A. Brizzee; Randy D. Lee

2005-11-01T23:59:59.000Z

80

US hydropower resource assessment for New Jersey  

Science Conference Proceedings (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of New Jersey.

Connor, A.M.; Francfort, J.E.

1996-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

21st century advanced hydropower turbine system  

DOE Green Energy (OSTI)

While hydropower turbine manufacturers have incrementally improved turbine technology to increase efficiency, the basic design concepts haven`t changed for decades. These late 19th and early 20th century designs did not consider environmental effects, since little was known about environmental effects of hydropower at the time. The U.S. Department of Energy (DOE) and the hydropower industry recognize that hydropower plants have an effect on the environment and there is a great need to bring turbine designs into the 21st century. DOE has issued a request for proposals (RFP) that requested proposers to discard conventional thinking, search out innovative solutions, and to visualize innovative turbines designed from a new perspective. This perspective would look at the {open_quotes}turbine system{close_quotes} (intake to tailrace) which will balance environmental, technical, and economic considerations. This paper describes the DOE Advanced Hydropower Turbine System Program.

Brookshier, P.A.; Flynn, J.V.; Loose, R.R.

1995-11-01T23:59:59.000Z

82

US Hydropower Resource Assessment for Massachusetts  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the Commonwealth of Massachusetts.

Francfort, J.E.; Rinehart, B.N.

1995-07-01T23:59:59.000Z

83

US hydropower resource assessment for New Hampshire  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of New Hampshire.

Francfort, J.E.

1995-07-01T23:59:59.000Z

84

US hydropower resource assessment for Texas  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Texas.

Francfort, J.E.

1993-12-01T23:59:59.000Z

85

US hydropower resource assessment for Kansas  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Kansas.

Francfort, J.E.

1993-12-01T23:59:59.000Z

86

US hydropower resource assessment for Rhode Island  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Rhode Island.

Francfort, J.E.; Rinehart, B.N.

1995-07-01T23:59:59.000Z

87

US hydropower resource assessment for Vermont  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Vermont.

Conner, A.M.; Francfort, J.E.

1996-02-01T23:59:59.000Z

88

US hydropower resource assessment for Wyoming  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Wyoming.

Francfort, J.E.

1993-12-01T23:59:59.000Z

89

US hydropower resource assessment for Montana  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Montana.

Francfort, J.E.

1993-12-01T23:59:59.000Z

90

US hydropower resource assessment for Indiana  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Indiana.

Francfort, J.E.

1995-12-01T23:59:59.000Z

91

US hydropower resource assessment for Iowa  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Iowa.

Francfort, J.E.

1995-12-01T23:59:59.000Z

92

US hydropower resource assessment for Arkansas  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Arkansas.

Francfort, J.E.

1993-12-01T23:59:59.000Z

93

US hydropower resource assessment for North Dakota  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of North Dakota.

Francfort, J.E.

1993-12-01T23:59:59.000Z

94

US hydropower resource assessment for Colorado  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the hydropower development potential in this country. Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE, menu-driven software application. HES allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Colorado.

Francfort, J.E.

1994-05-01T23:59:59.000Z

95

U.S. Hydropower Resource Assessment - California  

DOE Green Energy (OSTI)

The U.S. Department of Energy is developing an estimate of the underdeveloped hydropower potential in the United States. For this purpose, the Idaho National Engineering and Environmental Laboratory developed a computer model called Hydropower Evaluation Software (HES). HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of California.

A. M. Conner; B. N. Rinehart; J. E. Francfort

1998-10-01T23:59:59.000Z

96

US hydropower resource assessment for Wisconsin  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Wisconsin.

Conner, A.M.; Francfort, J.E.

1996-05-01T23:59:59.000Z

97

US hydropower resource assessment for Utah  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Utah.

Francfort, J.E.

1993-12-01T23:59:59.000Z

98

US hydropower resource assessment for Oklahoma  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose, The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Oklahoma.

Francfort, J.E.

1993-12-01T23:59:59.000Z

99

US hydropower resource assessment for Louisiana  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Louisiana.

Francfort, J.E.

1993-12-01T23:59:59.000Z

100

US hydropower resource assessment for Missouri  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Missouri.

Francfort, J.E.

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

US hydropower resource assessment for Washington  

DOE Green Energy (OSTI)

The U.S. Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Washington.

Conner, A.M.; Francfort, J.E.

1997-07-01T23:59:59.000Z

102

U.S. Hydropower Resource Assessment - Georgia  

DOE Green Energy (OSTI)

The U.S. Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. For this purpose, the Idaho National Engineering and Environmental Laboratory developed a computer model called Hydropower Evaluation Software (HES). HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Georgia.

A. M. Conner; B. N. Rinehart; J. E. Francfort

1998-10-01T23:59:59.000Z

103

Hydropower: Setting a Course for Our Energy Future  

DOE Green Energy (OSTI)

Hydropower is an annual publication that provides an overview of the Department of Energy's Hydropower Program. The mission of the program is to conduct research and development that will increase the technical, societal, and environmental benefits of hydropower and provide cost-competitive technologies that enable the development of new and incremental hydropower capacity.

Not Available

2004-07-01T23:59:59.000Z

104

IEA Wind Task 24 Integration of Wind and Hydropower Systems; Volume 1: Issues, Impacts, and Economics of Wind and Hydropower Integration  

DOE Green Energy (OSTI)

This report describes the background, concepts, issues and conclusions related to the feasibility of integrating wind and hydropower, as investigated by the members of IEA Wind Task 24. It is the result of a four-year effort involving seven IEA member countries and thirteen participating organizations. The companion report, Volume 2, describes in detail the study methodologies and participant case studies, and exists as a reference for this report.

Acker, T.

2011-12-01T23:59:59.000Z

105

Uniform criteria for US Hydropower Resource Assessment. Hydropower evaluation software status report  

SciTech Connect

The Department of Energy is estimating the hydropower development potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The Hydropower Evaluation Software estimates the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a DBASE, menu-driven software application. Hydropower Evaluation Software allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This status report details Hydropower Evaluation Software`s development, its data requirements, and its application to the 12 states assessed to date. This report does not discuss or present the various user-friendly menus of the Hydropower Evaluation Software. One is referred to the User`s Manual for specifics. This report focuses on data derivation, summarization of the 12 states (Arkansas, Colorado, Kansas, Louisiana, Missouri, Montana, North Dakota, Oklahoma, South Dakota, Texas, Utah, and Wyoming) extracted into the software to date, and plans for future assessments.

Francfort, J.E.; Rinehart, B.N. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Moore, K.M. [Morgantown Energy Technology Center, WV (United States)

1993-06-01T23:59:59.000Z

106

Uniform criteria for U.S. hydropower resource assessment: Hydropower Evaluation Software status report -- 2  

SciTech Connect

The US Department of Energy is estimating the undeveloped hydropower potential in the US. The Hydropower Evaluation software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The Hydropower Evaluation Software estimates the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software application. Hydropower Evaluation Software allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This status report describes Hydropower Evaluation Software`s development, its data requirements, and its application to the 20 states assessed to date. This report does not discuss or present the various user-friendly menus of the Hydropower Evaluation Software. The reader is referred to the User`s Manual for specifics. This report focuses on data derivation, summarization of the 20 states (Arkansas, Missouri, Montana, New Hampshire, North Dakota, Oklahoma, Rhode Island, South Dakota, Texas, Utah, Vermont, and Wyoming) assessed to date, and plans for future assessments.

Conner, A.M.; Francfort, J.E.; Rinehart, B.N.

1996-02-01T23:59:59.000Z

107

MiniBooNE  

SciTech Connect

To begin, we examine the relationship between MiniBooNE and the neutrino beam geometry at Fermilab. In Figure 1, a schematic representation is shown of the plan view of the location of MiniBooNE relative to SciBooNE and the NuMI target, where it can be seen that SciBooNE and MiniBooNE share the same beamline and neutrino flux, and therefore share some of the same systematic effects -- A combined analysis between the two experimental groups could yield a superior result compared to segregated individual analysis. MiniBooNE makes an angle of 6.3 degrees with the NuMI beamline, an off-axis measurement if you will, that provides a relatively high yield of electron neutrinos from kaon decay. Furthermore, the proton beam incident on the MiniBooNE target possesses a 53 MHz structure that will be important in timing studies related to the low energy excess. Let's review of the results of the MiniBooNE: As is well known, MiniBooNE, a test of the LSND effect [1], adds experimental inspiration to the possible existence of new phenomena; although two neutrino-family oscillations were shown to be an unlikely candidate to explain the LSND effect, a low energy excess of 3.0 sigma in the neutrino sector at energies between 200 to 475 MeV [2] - an effect that appears to have no counterpart in the antineutrino sector [3], combined with the 3.8 sigma LSND result - at roughly 50 MeV - strains phenomenology for insight. Miniboones continues to run and collect antineutrino data; will combine disappearance analysis with SciBooNE; take data from the NuMI target, an unusual source with a potentially new look at the low energy anomaly; and use beam timing techniques to further constrain phenomenological models. In this paper we will review current topics related to MiniBooNE and other associated experiments and phenomenology.

Stefanski, Ray; /Fermilab

2009-10-01T23:59:59.000Z

108

Idaho National Laboratory - Hydropower Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering Research and Development Engineering Research and Development 1997 Alden Research Laboratory, Inc. and Northern Research and Engineering Corporation, 1997, Development of a More Fish-Tolerant Turbine Runner, Advanced Hydropower Turbine Project, ARL Report No. 13-97/M63F, DOE/ID-10571. Alden Research Laboratory, Inc. and Northern Research and Engineering Corporation conducted a research program to develop a turbine runner which will minimize fish injury and mortality at hydroelectric projects. An existing pump impeller provided the starting point for developing the fish-tolerant turbine runner. The Hidrostal pump is a single-bladed combined screw/centrifugal pump which has been proven to transport fish with minimal injury. The focus of this research project was to develop a new runner geometry which is effective in downstream fish passage and

109

Brainpower for Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brainpower for Hydropower Brainpower for Hydropower Brainpower for Hydropower May 10, 2012 - 4:27pm Addthis Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Jonathan Bartlett Wind Powering America National Coordinator What are the key facts? Today the Energy Department announced 2012 selections for the Hydro Fellowship Program. This fellowship program provides participants with financial assistance and the opportunity to pursue a variety of hydropower research topics. Today, the Energy Department, in cooperation with the Hydro Research

110

Brainpower for Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brainpower for Hydropower Brainpower for Hydropower Brainpower for Hydropower May 10, 2012 - 4:27pm Addthis Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Mark Cecchini-Beaver at the University of Idaho is one of ten new participants in the Hydro Fellowship Program. | Photo courtesy of the Hydro Research Foundation. Jonathan Bartlett Wind Powering America National Coordinator What are the key facts? Today the Energy Department announced 2012 selections for the Hydro Fellowship Program. This fellowship program provides participants with financial assistance and the opportunity to pursue a variety of hydropower research topics. Today, the Energy Department, in cooperation with the Hydro Research

111

Energy Basics: Large-Scale Hydropower  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

These plants are more than 30 MW in size, and there is more than 80,000 MW of installed generation capacity in the United States today. Most large-scale hydropower projects use a...

112

Idaho National Laboratory - Hydropower Program: Hydrofacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose or Benefit of U.S. Dams National Inventory of Dams Statistic Contact: Hydropower, Send E-mail Last Updated: Monday, July 18, 2005 Copyright 2013 Idaho National...

113

Idaho National Laboratory - Hydropower Program: Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

Rinehart, U.S. Hydropower Resource Assessment Final Report (182 KB PDF), DOEID-10430.2, U.S. Department of Energy, December 1998. To provide a more accurate assessment of the...

114

Microsoft Word - 2011 Hydropower Conference Agenda 053111  

NLE Websites -- All DOE Office Websites (Extended Search)

Welcome KCD 1:15 p.m. Introductory Remarks KCD SWPA Ted Coombes, SPRA 1:45 p.m. COE Hydropower Modernization Kamau Sadiki, COE HQ Initiative - Study Results and Southwestern...

115

Microsoft Word - FINAL 2012 Hydropower Conference Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Introductory Remarks MVD Colonel Masset, SWL SWPA Ted Coombes, SPRA 1:45 p.m. COE Hydropower Modernization Kamau Sadiki, COE HQ Initiative - Study Results and Marshall Boyken,...

116

Idaho National Laboratory - Hydropower Program: Bibliography  

NLE Websites -- All DOE Office Websites (Extended Search)

is part of the Advanced Hydropower Turbine Project sponsored by the U.S. Department of Energy (DOE). The conceptual design phase of the program defined a new hydro-turbine...

117

Grid Services from Hydropower and Pumped Storage  

Science Conference Proceedings (OSTI)

This Technical Update provides a summary of progress for the first year of a two-year collaborative research project to determine the value of hydropower to the electric transmission grid. This project utilizes, enhances, and expands tools to apply and value hydropower assets in the changing electric grid. The project employs several industry analyses and modeling tools at the unit level, the plant level, the system level, and the regional/national level, for quantifying and maximizing the benefits provi...

2010-12-31T23:59:59.000Z

118

Hydropower Resource Assessment of Brazilian Streams  

DOE Green Energy (OSTI)

The Idaho National Laboratory (INL) in collaboration with the U.S. Geological Survey (USGS) with the assistance of the Empresa de Pesquisa Energetica (EPE) and the Agencia Nacional de Energia Electrica (ANEEL) has performed a comprehensive assessment of the hydropower potential of all Brazilian natural streams. The methodology by which the assessment was performed is described. The results of the assessment are presented including an estimate of the hydropower potential for all of Brazil, and the spatial distribution of hydropower potential thus providing results on a state by state basis. The assessment results have been incorporated into a geographic information system (GIS) application for the Internet called the Virtual Hydropower Prospector do Brasil. VHP do Brasil displays potential hydropower sites on a map of Brazil in the context of topography and hydrography, existing power and transportation infrastructure, populated places and political boundaries, and land use. The features of the application, which includes tools for finding and selecting potential hydropower sites and other features and displaying their attributes, is fully described.

Douglas G. Hall

2011-09-01T23:59:59.000Z

119

IEA Wind Task 24 Integration of Wind and Hydropower Systems; Volume 2: Participant Case Studies  

SciTech Connect

This report describes the background, concepts, issues and conclusions related to the feasibility of integrating wind and hydropower, as investigated by the members of IEA Wind Task 24. It is the result of a four-year effort involving seven IEA member countries and thirteen participating organizations. The companion report, Volume 2, describes in detail the study methodologies and participant case studies, and exists as a reference for this report.

Acker, T.

2011-12-01T23:59:59.000Z

120

Hydropower and Ocean Energy Resources and Technologies | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower and Ocean Energy Resources and Technologies Hydropower and Ocean Energy Resources and Technologies Hydropower and Ocean Energy Resources and Technologies October 7, 2013 - 9:29am Addthis Photo of water flowing from several openings in a hydropower dam. Hydropower produces 10% of the nation's energy, including power from the Ice Harbor Dam in Burbank, Washington. This page provides a brief overview of hydropower and ocean energy resources and technologies supplemented by specific information to apply these technologies within the Federal sector. Overview Hydropower has been used for centuries to power machinery, but the application most commonly associated with hydropower is electricity production through dams. Ocean energy refers to various forms of renewable energy harnessed from the ocean. There are two primary types of ocean energy: mechanical and thermal.

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Modern Control System Design for Hydro-power Plant.  

E-Print Network (OSTI)

??This thesis addresses dynamic model and advance controller design for entire Hydro-power plant. Although hydro-power has the best payback ratio and the highest efficiency in (more)

Ding, Xibei

2011-01-01T23:59:59.000Z

122

Economics of Cherepnov water lifter for low-head hydropower  

Science Conference Proceedings (OSTI)

The economic feasibility of using the Cherepnov lifter to augment the water head in small-scale hydroelectric power generation was investigated, and is reported. The economics of the cherepnov lifter for use as a pump to supply water looks very promising both for large and small systems. However, the economics of using the lifter in hydroelectric power generation is not promising, especially for large and high-head systems. This, however, does not preclude the economics or the desirability of using the lifter for microhydro low-head systems, especially if low-cost tanks are available and PVC pipes can be used. A desirable feature of the lifter separate from economical considerations is the ability of the lifter to pass fish unharmed. This feature should be taken advantage of when the lifter is used for hydropower generation.

Liu, H.; Geekie, R.

1983-01-01T23:59:59.000Z

123

Hydropower: Setting a Course for Our Energy Future. Wind and...  

NLE Websites -- All DOE Office Websites (Extended Search)

aim to identify potential sites and partners . . . . . . . . . . . . . . . . . . . . 17 Wind & Hydropower Technologies Program - Harnessing America's abundant natural resources...

124

Boosting America's Hydropower Output | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boosting America's Hydropower Output Boosting America's Hydropower Output Boosting America's Hydropower Output October 9, 2012 - 2:10pm Addthis The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado. The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado. City of Boulder employees celebrate the completion of the Boulder Canyon Hydroelectric Modernization project. | Photo courtesy of the city of Boulder, Colorado. City of Boulder employees celebrate the completion of the Boulder Canyon Hydroelectric Modernization project. | Photo courtesy of the city of Boulder, Colorado. The Boulder Canyon Hydroelectric Facility's new, highly-efficient turbine. | Photo courtesy of the city of Boulder, Colorado.

125

Huaneng Lancang River Hydropower | Open Energy Information  

Open Energy Info (EERE)

Lancang River Hydropower Lancang River Hydropower Jump to: navigation, search Name Huaneng Lancang River Hydropower Place Kunming, Yunnan Province, China Zip 650214 Sector Hydro, Solar Product Developer of hydro and solar power projects. Coordinates 25.051001°, 102.702011° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":25.051001,"lon":102.702011,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

126

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

127

Gas Mileage of 2013 Vehicles by MINI  

NLE Websites -- All DOE Office Websites (Extended Search)

3 MINI Vehicles EPA MPG MODEL City Comb Hwy 2013 MINI Cooper 4 cyl, 1.6 L, Automatic (S6), Premium Gasoline Compare 2013 MINI Cooper View MPG Estimates Shared By Vehicle Owners 28...

128

CX-000104: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination Pedro Bay Native Village Technical Consulting Services for Mini Hydropower Feasibility Study CX(s) Applied: A9, A11 Date: 12042009 Location(s): Alaska...

129

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination Pedro Bay Native Village Technical Consulting Services for Mini Hydropower Feasibility Study CX(s) Applied: A9, A11 Date: 12042009 Location(s): Alaska...

130

Categorical Exclusion Determinations: A11 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination Pedro Bay Native Village Technical Consulting Services for Mini Hydropower Feasibility Study CX(s) Applied: A9, A11 Date: 12042009 Location(s): Alaska...

131

Alaska | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination Pedro Bay Native Village Technical Consulting Services for Mini Hydropower Feasibility Study CX(s) Applied: A9, A11 Date: 12042009 Location(s): Alaska...

132

Categorical Exclusion Determinations: Native American and Alaskan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination Pedro Bay Native Village Technical Consulting Services for Mini Hydropower Feasibility Study CX(s) Applied: A9, A11 Date: 12042009 Location(s): Alaska...

133

Rehabilitating and Upgrading Hydropower Plants: A Hydropower Technology Round-Up Report, Volume 2  

Science Conference Proceedings (OSTI)

Owners of aging hydropower plants are confronted with an array of project and technology options for rehabilitating or upgrading their facilities and are making large capital investment decisions at a time of increasing competitive pressures. Ensuring that investments in plant are optimal requires a thorough understanding of the technologies, approaches and strategies available for rehab and upgrading -- as well as the risks associated with these projects. This volume of EPRI's Hydropower Technology Roun...

1999-10-28T23:59:59.000Z

134

Federal Memorandum of Understanding for Hydropower | Open Energy  

Open Energy Info (EERE)

Memorandum of Understanding for Hydropower Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Federal Memorandum of Understanding for Hydropower On March 24, 2010, the Department of the Army through the U.S. Army Corps of Engineers, the Department of Energy, and the Department of the Interior signed the Memorandum of Understanding (MOU) for Hydropower. The purpose of the MOU is to "help meet the nation's needs for reliable, affordable, and environmentally sustainable hydropower by building a long-term working relationship, prioritizing similar goals, and aligning ongoing and future renewable energy development efforts." Additionally, the MOU aims to

135

Antu County 303 Hydropower Station Co Ltd | Open Energy Information  

Open Energy Info (EERE)

Antu County 303 Hydropower Station Co Ltd Antu County 303 Hydropower Station Co Ltd Jump to: navigation, search Name Antu County 303 Hydropower Station Co., Ltd. Place Jilin Province, China Zip 133613 Sector Hydro Product China-based small hydro CDM project developer. References Antu County 303 Hydropower Station Co., Ltd.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Antu County 303 Hydropower Station Co., Ltd. is a company located in Jilin Province, China . References ↑ "Antu County 303 Hydropower Station Co., Ltd." Retrieved from "http://en.openei.org/w/index.php?title=Antu_County_303_Hydropower_Station_Co_Ltd&oldid=342210" Categories: Clean Energy Organizations Companies Organizations

136

$26.6 Million for Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$26.6 Million for Hydropower $26.6 Million for Hydropower $26.6 Million for Hydropower April 5, 2011 - 4:52pm Addthis Ice Harbor Dam | Photo courtesy of the US Army Corps of Engineers Ice Harbor Dam | Photo courtesy of the US Army Corps of Engineers Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs Today, the Department of Energy and the Department of Interior announced $26.6 million of available funding for companies and entrepreneurs looking to advance hydropower. "By improving hydropower technology, we can maximize America's biggest source of renewable energy in an environmentally responsible way," said Secretary Chu. Specifically, funding is available for projects in the following four areas: Sustainable small hydropower Environmental mitigation technologies for conventional hydropower

137

&#8220;Sustainable development of hydropower in third countries: The  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sustainable development of hydropower in third countries: Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight agains “Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight agains “Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight against glo

138

U.S. hydropower resource assessment for Virginia  

DOE Green Energy (OSTI)

In June 1989, the US Department of Energy initiated the development of a National Energy Strategy to identify the energy resources available to support the expanding demand for energy in the US. Public hearings conducted as part of the strategy development process indicated that undeveloped hydropower resources were not well defined. As a result, the Department of Energy established an interagency Hydropower Resource Assessment Team to ascertain the undeveloped hydropower potential. In connection with these efforts by the Department of Energy, the Idaho National Engineering Laboratory designed the Hydropower Evaluation Software (HES), which has been used to perform a resource assessment of the undeveloped conventional hydropower potential in over 30 states. This report presents the results of the hydropower resource assessment for the State of Virginia. Undeveloped pumped storage hydropower potential is not included.

Conner, A.M.; Francfort, J.E.

1997-12-01T23:59:59.000Z

139

Virtual Hydropower Prospector | Open Energy Information  

Open Energy Info (EERE)

Virtual Hydropower Prospector Virtual Hydropower Prospector Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Virtual Hydropower Prospector Agency/Company /Organization: Idaho National Laboratory Sector: Energy Topics: Resource assessment Resource Type: Software/modeling tools User Interface: Website Website: hydropower.inl.gov/prospector/index.shtml Country: United States Cost: Free Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

140

Idaho National Laboratory - Hydropower Program: Technology Transfer  

NLE Websites -- All DOE Office Websites (Extended Search)

Part 16 (9.6MB PDF) Part 17 ( 11MB PDF) Part 18 (6.9MB PDF) Part 19 (8.2MB PDF) Micro-Hydro Power Reviewing an old Concept, January 1979 (2.6MB PDF) Contact: Hydropower, Send...

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Hydropower resources at risk: The status of hydropower regulation and development - 1997  

DOE Green Energy (OSTI)

This report documents today`s hydropower licensing and development status based on published data as follows: (a) Federal Energy Regulatory Commission (FERC) databases, maintained by FERC`s Office of Hydropower Licensing, of: (1) operating FERC-regulated projects, federal projects, and known unlicensed projects; (2) surrendered licenses; and, (3) recent licensing and relicensing actions; (b) Energy Information Administration (EIA) data on installed capacity and generation from 1949 through 1995 for the various resources used to produce electricity in the U.S.; and, (c) FERC licensing orders, and environmental assessments or environmental impact statements for each individual project relicensed since 1980. The analysis conducted to prepare this paper includes the effects of all FERC hydropower licensing actions since 1980, and applies those findings to estimate the costs of hydropower licensing and development activity for the next 15 years. It also quantifies the national cost of hydropower regulation. The future estimates are quite conservative. The are presented in 1996 dollars without speculating on the effects of future inflation, license surrenders, conditions imposed through open-ended license articles, license terms greater than 30 years, or low water years. Instead, they show the most directly predictable influences on licensing outcomes using actual experiences since ECPA (after 1986).

Hunt, R.T.; Hunt, J.A. [Richard Hunt Associates, Inc., Annapolis, MD (United States)

1997-09-01T23:59:59.000Z

142

Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos County Completes Abiquiu Hydropower Project, Bringing Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico April 21, 2011 - 12:00am Addthis WASHINGTON, D.C. - U.S. Energy Secretary Steven Chu issued the following statement on the completion and startup today of the Abiquiu Hydropower Project in New Mexico - the first hydropower project funded by the American Recovery and Reinvestment Act to be completed nationwide. "Today marks a major milestone in securing America's clean energy future as we celebrate the completion of the Department of Energy's first major Recovery Act-funded water power project. By increasing renewable energy output at existing hydropower facilities, we can create clean energy jobs,

143

Large-Scale Hydropower Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Large-Scale Hydropower Basics Large-Scale Hydropower Basics Large-Scale Hydropower Basics August 14, 2013 - 3:11pm Addthis Large-scale hydropower plants are generally developed to produce electricity for government or electric utility projects. These plants are more than 30 megawatts (MW) in size, and there is more than 80,000 MW of installed generation capacity in the United States today. Most large-scale hydropower projects use a dam and a reservoir to retain water from a river. When the stored water is released, it passes through and rotates turbines, which spin generators to produce electricity. Water stored in a reservoir can be accessed quickly for use during times when the demand for electricity is high. Dammed hydropower projects can also be built as power storage facilities.

144

Large-Scale Hydropower Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Large-Scale Hydropower Basics Large-Scale Hydropower Basics Large-Scale Hydropower Basics August 14, 2013 - 3:11pm Addthis Large-scale hydropower plants are generally developed to produce electricity for government or electric utility projects. These plants are more than 30 megawatts (MW) in size, and there is more than 80,000 MW of installed generation capacity in the United States today. Most large-scale hydropower projects use a dam and a reservoir to retain water from a river. When the stored water is released, it passes through and rotates turbines, which spin generators to produce electricity. Water stored in a reservoir can be accessed quickly for use during times when the demand for electricity is high. Dammed hydropower projects can also be built as power storage facilities.

145

The Role of Hydropower Reservoirs in Greenhouse Gas Emissions  

Science Conference Proceedings (OSTI)

Recent publications of measurements and analyses of reservoir greenhouse gas (GHG) emissions have sparked debate about the carbon neutrality of hydropower. This report describes the results of two initial tasks of a multiyear study to assess the importance of carbon cycling and GHG emissions from hydropower reservoirs and operations in the United States. The risks this issue presents to the U.S. hydropower industry are discussed, and a plan to resolve uncertainties is presented. Throughout this report, r...

2010-05-20T23:59:59.000Z

146

Quantifying the Value of Hydropower in the Electric Grid  

Science Conference Proceedings (OSTI)

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results ...

2013-03-01T23:59:59.000Z

147

The Next Generation of Hydropower Engineers and Scientists |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation of Hydropower Engineers and Scientists August 11, 2011 - 12:31pm Addthis Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation...

148

File:Federal Hydropower - Southeastern Power Administration.pdf...  

Open Energy Info (EERE)

Login | Sign Up Search File Edit History Facebook icon Twitter icon File:Federal Hydropower - Southeastern Power Administration.pdf Jump to: navigation, search File File...

149

NREL: Energy Analysis - Hydropower Results - Life Cycle Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Special Report on Renewable Energy Sources and Climate Change Mitigation: Hydropower OpenEI: Data, Visualization, and Bibliographies Chart that shows life cycle greenhouse gas...

150

Microsoft PowerPoint - Hydropower conf SDOX June 2008 final ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Osborn, Chief Technology Officer Clay Thompson, Senior Engineer Southwestern Federal Hydropower Conference June 12, 2008 BlueInGreen, LLC 535 W. Research Blvd. Fayetteville, AR...

151

Investments in Existing Hydropower Unlock More Clean Energy ...  

NLE Websites -- All DOE Office Websites (Extended Search)

to upgrade the nation's existing hydropower facilities -- helping to increase our supply of clean, renewable energy and provide more communities with affordable, reliable...

152

Hydropower, Wave and Tidal Technologies - Energy Innovation Portal  

Biomass and Biofuels Hydropower, Wave and Tidal Industrial ... raw materials suggests the need for elimination of these materials from electric motors ...

153

Editorial: Time for green certification for all hydropower?  

Science Conference Proceedings (OSTI)

While accrediting a large hydropower facility is intrinsically more complex and potentially controversial, it is time to review the progress made in understanding the environmental impacts of large hydropower and the development of environmentally friendly hydropower systems. Over the last two decades, many in-field, laboratory, and modeling technologies have been developed or improved to better understand the mechanisms of fish injury and mortality and to identify turbine design and operation alternatives to reduce such impacts. In 2010, representatives of DOE and the US Department of Interior, and USACE signed a memorandum of understanding to work more closely to develop sustainable hydropower. One of their major objectives is to increase hydropower generation using low-impact and environmentally sustainable approaches. Given the recent scientific and technological advances that have decreased the environmental impact of hydropower and the need to aggressively facilitate development of low impact hydropower, we think it is indeed time to initiate a science-based green certification program that includes rigorous criteria for environmental protection but does not exclude hydropower based on size only.

Deng, Zhiqun; Carlson, Thomas J.

2012-04-10T23:59:59.000Z

154

Short-term hydropower production planning by stochastic programming  

Science Conference Proceedings (OSTI)

Within the framework of multi-stage mixed-integer linear stochastic programming we develop a short-term production plan for a price-taking hydropower plant operating under uncertainty. Current production must comply with the day-ahead commitments of ... Keywords: Hydropower, OR in energy, Scenarios, Stochastic programming

Stein-Erik Fleten; Trine Krogh Kristoffersen

2008-08-01T23:59:59.000Z

155

U.S. hydropower resource assessment for Alaska  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Alaska.

Conner, A.M.; Francfort, J.E.

1997-11-01T23:59:59.000Z

156

U.S. hydropower resource assessment for Minnesota  

DOE Green Energy (OSTI)

The U.S. Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Minnesota.

Francfort, J.E.

1996-07-01T23:59:59.000Z

157

U.S. hydropower resource assessment for Michigan  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Michigan.

Conner, A.M.; Francfort, J.E.

1998-02-01T23:59:59.000Z

158

16 Projects To Advance Hydropower Technology | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects To Advance Hydropower Technology Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology September 6, 2011 - 11:24am Addthis U.S. Department Energy Secretary Steven Chu and U.S. Department of the Interior Secretary Ken Salazar announced nearly $17 million in funding over the next three years for research and development projects to advance hydropower technology. The list of 16 projects in 11 different states can be found here. Applicant Location Award Amount; Funding is from DOE unless otherwise noted Description Sustainable Small Hydro (Topic Areas 1.1. and 1.2) Earth by Design Bend, OR $1,500,000 This project will develop and test a new low-head modular hydropower technology in a canal in Oregon's North Unit Irrigation District to produce cost-competitive electricity.

159

16 Projects To Advance Hydropower Technology | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology 16 Projects To Advance Hydropower Technology September 6, 2011 - 11:24am Addthis U.S. Department Energy Secretary Steven Chu and U.S. Department of the Interior Secretary Ken Salazar announced nearly $17 million in funding over the next three years for research and development projects to advance hydropower technology. The list of 16 projects in 11 different states can be found here. Applicant Location Award Amount; Funding is from DOE unless otherwise noted Description Sustainable Small Hydro (Topic Areas 1.1. and 1.2) Earth by Design Bend, OR $1,500,000 This project will develop and test a new low-head modular hydropower technology in a canal in Oregon's North Unit Irrigation District to produce cost-competitive electricity.

160

Property:PotentialHydropowerGeneration | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerGeneration PotentialHydropowerGeneration Jump to: navigation, search Property Name PotentialHydropowerGeneration Property Type Quantity Description The estimated potential energy generation from Hydropower for a particular place. Use this type to express a quantity of energy. The default unit for energy on OpenEI is the Kilowatt hour (kWh), which is 3,600,000 Joules. http://en.wikipedia.org/wiki/Unit_of_energy It's possible types are Watt hours - 1000 Wh, Watt hour, Watthour Kilowatt hours - 1 kWh, Kilowatt hour, Kilowatthour Megawatt hours - 0.001 MWh, Megawatt hour, Megawatthour Gigawatt hours - 0.000001 GWh, Gigawatt hour, Gigawatthour Joules - 3600000 J, Joules, joules Pages using the property "PotentialHydropowerGeneration" Showing 25 pages using this property. (previous 25) (next 25)

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Property:PotentialHydropowerSites | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerSites PotentialHydropowerSites Jump to: navigation, search Property Name PotentialHydropowerSites Property Type Number Description The number of potential hydropower sites in a place. Pages using the property "PotentialHydropowerSites" Showing 25 pages using this property. (previous 25) (next 25) A Alabama + 2,435 + Alaska + 3,053 + Arizona + 1,958 + Arkansas + 3,268 + C California + 9,692 + Colorado + 5,060 + Connecticut + 659 + D Delaware + 25 + F Florida + 493 + G Georgia + 2,100 + H Hawaii + 437 + I Idaho + 6,706 + Illinois + 1,330 + Indiana + 1,142 + Iowa + 2,398 + K Kansas + 3,201 + Kentucky + 1,394 + L Louisiana + 934 + M Maine + 1,373 + Maryland + 491 + Massachusetts + 560 + Michigan + 1,942 + Minnesota + 1,391 + Mississippi + 1,536 + Missouri + 5,089 +

162

The Next Generation of Hydropower Engineers and Scientists | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Next Generation of Hydropower Engineers and Scientists The Next Generation of Hydropower Engineers and Scientists The Next Generation of Hydropower Engineers and Scientists August 11, 2011 - 12:31pm Addthis Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation Fellowship Program. Hydro Research Foundation Fellows. | Image courtesy of the Hydro Research Foundation Fellowship Program. Mike Reed Water Power Program Manager, Water Power Program As the nation continues to rely on hydropower to help meet its energy needs, a new generation of engineers and scientists is finding ways to make hydropower technologies more efficient, environmentally friendly and cost effective. The Energy Department's Office of Energy Efficiency and Renewable Energy (EERE), in cooperation with the Hydro Research

163

Event:Hydropower Africa 2012 | Open Energy Information  

Open Energy Info (EERE)

2012 2012 Jump to: navigation, search Calendar.png Hydropower Africa 2012: on 2012/09/04 "Hydropower Africa 2012 is the largest hydropower event of its kind in Africa boasting over 450 visitors from across the globe. It looks at planned projects and tender prospects for hydropower development in Africa and innovative funding solutions for projects - big and small. Refurbishment and modernisation updates of major hydropower facilities as well as operation and maintenance best practices from across the continent will be presented and discussed. Infrastructure development and African-appropriate engineering solutions to provide power to villages, rural areas and urban communities and achieving operational objectives while addressing environment and social challenges will be examined through

164

U.S. hydropower resource assessment for Alabama  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Alabama.

Conner, A.M.; Francfort, J.E.

1998-02-01T23:59:59.000Z

165

U.S. hydropower resource assessment for Oregon  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Oregon.

Conner, A.M.; Francfort, J.E.

1998-03-01T23:59:59.000Z

166

U.S. hydropower resource assessment for Mississippi  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Mississippi.

Conner, A.M.; Francfort, J.E.

1997-11-01T23:59:59.000Z

167

U.S. hydropower resource assessment for Connecticut  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydro-power potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Connecticut.

Francfort, J.E.; Rinehart, B.N.

1995-07-01T23:59:59.000Z

168

U.S. hydropower resource assessment for New Mexico  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of New Mexico.

Conner, A.M.; Francfort, J.E.

1997-03-01T23:59:59.000Z

169

U.S. hydropower resource assessment for Florida  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Florida.

Conner, A.M.; Francfort, J.E.

1998-02-01T23:59:59.000Z

170

U.S. hydropower resource assessment for Kentucky  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Kentucky.

Conner, A.M.; Francfort, J.E.

1998-07-01T23:59:59.000Z

171

U.S. hydropower resource assessment for Maine  

DOE Green Energy (OSTI)

The Department of Energy is developing an estimate of the undeveloped hydro-power potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of Maine.

Francfort, J.E.; Rinehart, B.N.

1995-07-01T23:59:59.000Z

172

U.S. hydropower resource assessment for North Carolina  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of North Carolina.

Conner, A.M.; Francfort, J.E.

1997-10-01T23:59:59.000Z

173

U.S. hydropower resource assessment for Tennessee  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Tennessee.

Conner, A.M.; Francfort, J.E.

1997-07-01T23:59:59.000Z

174

U.S. hydropower resource assessment for Pennsylvania  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Pennsylvania.

Conner, A.M.; Francfort, J.E.

1997-12-01T23:59:59.000Z

175

U.S. hydropower resource assessment for Maryland  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Maryland.

Conner, A.M.; Francfort, J.E.

1997-11-01T23:59:59.000Z

176

U.S. hydropower resource assessment for West Virginia  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of West Virginia.

Conner, A.M.; Francfort, J.E.

1998-02-01T23:59:59.000Z

177

U.S. hydropower resource assessment for Arizona  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Arizona.

Conner, A.M.; Francfort, J.E.

1997-10-01T23:59:59.000Z

178

U.S. hydropower resource assessment for Nebraska  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Nebraska.

Conner, A.M.; Francfort, J.E.

1997-04-01T23:59:59.000Z

179

U.S. hydropower resource assessment for Ohio  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Ohio.

Conner, A.M.; Francfort, J.E.

1997-12-01T23:59:59.000Z

180

U.S. hydropower resource assessment for Illinois  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Illinois.

Conner, A.M.; Francfort, J.E.

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

U.S. hydropower resource assessment for Idaho  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Idaho.

Conner, A.M.; Francfort, J.E.

1998-08-01T23:59:59.000Z

182

U.S. hydropower resource assessment for South Carolina  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. To assist in providing this estimate, the Idaho National Engineering Laboratory developed the Hydropower Evaluation Software (HES) computer model. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of South Carolina.

Conner, A.M.; Francfort, J.E.

1997-06-01T23:59:59.000Z

183

U.S. Hydropower Resource Assessment Final Report  

DOE Green Energy (OSTI)

To provide a more accurate assessment of the domestic undeveloped hydropower capacity, the US Department of Energy's Hydropower Program developed a computer model, Hydropower Evaluation Software (HES). HES allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental, legal, and institutional attributes present, and generate reports based on these suitability factors. This report describes the development of HES, its data requirements, and its application to each state assessment; in addition, it summarizes the data derivation process and data for the states. Modeling of the undeveloped hydropower resources in the US, based on environmental, legal, and institutional constraints, has identified 5,677 sites that have a total undeveloped capacity of about 30,000 megawatts.

A. M. Conner; J. E. Francfort; B. N. Rinehart

1998-12-01T23:59:59.000Z

184

U.S. hydropower resource assessment for Nevada  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Nevada.

Conner, A.M.; Francfort, J.E.

1997-10-01T23:59:59.000Z

185

U.S. hydropower resource assessment for New York  

DOE Green Energy (OSTI)

The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of New York.

Conner, A.M.; Francfort, J.E.

1998-08-01T23:59:59.000Z

186

Hydropower Technology Roundup Report: Hydropower Valuation: Appraising Hydro as a Provider of Energy, Ecocultural, and Socioeconomic Benefits  

Science Conference Proceedings (OSTI)

Hydro project owners and operators need improved methods for determining the total value that hydropower facilities deliver to the diverse communities they serve and affect. This Hydropower Technology Roundup report provides information about existing valuation methodologies and offers a new, comprehensive framework applicable to valuation activities.

2005-03-15T23:59:59.000Z

187

Ductless, Mini-Split Heat Pumps  

Energy.gov (U.S. Department of Energy (DOE))

Ductless, mini-split-system heat pumps (mini splits), as their name implies, do not have ducts. Therefore, they make good retrofit add-ons to houses or buildings with "non-ducted" heating systems,...

188

DOE Hydropower Program Annual Report for FY 2002  

SciTech Connect

The U.S. Department of Energy (DOE) conducts research on advanced hydropower technology through its hydropower program, which is organized under the Office of Wind and Hydropower Technologies within the Office of Energy Efficiency and Renewable Energy. This annual report describes the various projects supported by the hydropower program in FY 2002. The program=s current focus is on improving the environmental performance of hydropower projects by addressing problems such as fish mortality during passage through turbines, alteration of instream habitat, and water quality in tailwaters. A primary goal of this research is to develop new, environmentally friendly technology. DOE-funded projects have produced new conceptual designs for turbine systems, and these are now being tested in pilot-scale laboratory tests and in the field. New design approaches range from totally new turbine runners to modifications of existing designs. Biological design criteria for these new turbines have also been developed in controlled laboratory tests of fish response to physical stresses, such as hydraulic shear and pressure changes. These biocriteria are being combined with computational tools to locate and eliminate areas inside turbine systems that are damaging to fish. Through the combination of laboratory, field, and computational studies, new solutions are being found to environmental problems at hydropower projects. The diverse program activities continue to make unique contributions to clean energy production in the U.S. By working toward technology improvements that can reduce environmental problems, the program is helping to reposition hydropower as an acceptable, renewable, domestic energy choice.

Garold L. Sommers; R. T. Hunt

2003-07-01T23:59:59.000Z

189

Federal Memorandum of Understanding for Hydropower/Participating Agencies |  

Open Energy Info (EERE)

Participating Agencies Participating Agencies < Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland Hydropower Working Group Participating Agencies Resources Bonneville Power Administration: caption:Bonneville Power Administration Bonneville Power Administration Factsheet Bonneville Power Administration Publications Conservation Resource Energy Data - The Red Book Bureau of Indian Affairs: caption:Bureau of Indian Affairs Bureau of Indian Affairs Factsheet Tribal Energy and Environmental Clearinghouse (TEEIC) Office of Indian Energy and Economic Development (IEED) Division of Irrigation, Power and Safety of Dams Bureau of Reclamation: caption:Bureau of Reclamation Factsheet

190

Hydropower Resource Assessment of Brazilian Streams  

NLE Websites -- All DOE Office Websites (Extended Search)

feasibility criteria specified by the user in terms of proximity to a road, railroad, power plant, transmission line, substation, or populated place and whether selected...

191

Commonwealth Hydropower Program (Massachusetts) | Open Energy...  

Open Energy Info (EERE)

Category Renewable Energy Incentive Programs Amount Design & Construction: 50% of costs or 1.00 per incremental kWh per year Feasibility study: 80% of costs Equipment...

192

A Boost for Hydropower (and the Economy) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Boost for Hydropower (and the Economy) A Boost for Hydropower (and the Economy) A Boost for Hydropower (and the Economy) September 20, 2010 - 5:29pm Addthis The 91-year old Cheoah Dam in Robbinsville, North Carolina. The 91-year old Cheoah Dam in Robbinsville, North Carolina. Jacques Beaudry-Losique Director, Wind & Water Program There are approximately 2,400 hydropower dams in the U.S., many of which have not undergone a significant upgrade in decades. These older dams present a great opportunity to expand clean energy across the country, allowing us to rapidly increase generation capacity through the installation of new high-efficiency equipment. I recently got a firsthand look at one such effort when I helped kick off a project to modernize the 91-year old Cheoah Dam in Robbinsville, North

193

Solar Energy and Small Hydropower Tax Credit (Corporate) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Energy and Small Hydropower Tax Credit (Corporate) Solar Energy and Small Hydropower Tax Credit (Corporate) Solar Energy and Small Hydropower Tax Credit (Corporate) < Back Eligibility Commercial Residential Savings Category Home Weatherization Commercial Weatherization Solar Lighting Windows, Doors, & Skylights Buying & Making Electricity Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Maximum Rebate In any given tax year, $3,500, or 50% of taxpayer's tax liability for that taxable year, whichever is less Program Info Start Date 1/1/2006 State South Carolina Program Type Corporate Tax Credit Rebate Amount 25% of eligible costs Provider South Carolina Department of Revenue In South Carolina, taxpayers may claim a credit of 25% of the costs of purchasing and installing a solar energy system or small hydropower system

194

New Hydropower Turbines to Save Snake River Steelhead | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Turbines to Save Snake River Steelhead Hydropower Turbines to Save Snake River Steelhead New Hydropower Turbines to Save Snake River Steelhead May 24, 2010 - 1:23pm Addthis Voith Hydro installed machines at the Bonneville Dam on the Columbia River, located about 40 miles east of Portland, Ore., that are meant to save more fish. The next-generation machines at Ice Harbor will be even more advanced. | Photo Courtesy of Voith Hydro Voith Hydro installed machines at the Bonneville Dam on the Columbia River, located about 40 miles east of Portland, Ore., that are meant to save more fish. The next-generation machines at Ice Harbor will be even more advanced. | Photo Courtesy of Voith Hydro Joshua DeLung Hydropower harnesses water power to create reliable, clean and plentiful renewable energy, but dams can have an unintended impact on wildlife --

195

Small Businesses Key in Hydropower Tech Advancement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Businesses Key in Hydropower Tech Advancement Businesses Key in Hydropower Tech Advancement Small Businesses Key in Hydropower Tech Advancement September 6, 2011 - 2:59pm Addthis Earlier today, the Department of Energy and the Department of Interior announced nearly $17 million in funding over the next three years to advance hydropower technology. The funding announced today will go to sixteen innovative projects around the country, including sustainable small hydro projects, like the ones from Hydro Green Energy, a small business that handles hydroelectric power generation and power and communication line construction. The company, which has eight employees currently, has been awarded funding for two projects. Near Space Systems, a Colorado Springs-based company, is a service-disabled veteran-owned business with a manufacturing focus that's

196

Solar Energy and Small Hydropower Tax Credit (Personal) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Energy and Small Hydropower Tax Credit (Personal) Solar Energy and Small Hydropower Tax Credit (Personal) Solar Energy and Small Hydropower Tax Credit (Personal) < Back Eligibility Commercial Residential Savings Category Home Weatherization Commercial Weatherization Solar Lighting Windows, Doors, & Skylights Buying & Making Electricity Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Maximum Rebate In any given tax year, $3,500, or 50% of taxpayer's tax liability for that taxable year, whichever is less Program Info Start Date 1/1/2006 State South Carolina Program Type Personal Tax Credit Rebate Amount 25% of eligible costs Provider South Carolina Department of Revenue In South Carolina, taxpayers may claim a credit of 25% of the costs of purchasing and installing a solar energy system or small hydropower system

197

Property:PotentialHydropowerCapacity | Open Energy Information  

Open Energy Info (EERE)

PotentialHydropowerCapacity PotentialHydropowerCapacity Jump to: navigation, search Property Name PotentialHydropowerCapacity Property Type Quantity Description The nameplate capacity technical potential from Hydropower for a particular place. Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

198

Electrolysis Production of Hydrogen from Wind and Hydropower Workshop Proceedings  

Fuel Cell Technologies Publication and Product Library (EERE)

This document summarizes the opportunities and challenges for low-cost renewable hydrogen production from wind and hydropower. The Workshop on Electrolysis Production of Hydrogen from Wind and Hydropo

199

Microsoft Word - FINAL 2013 Hydropower Meeting Agenda 060713  

NLE Websites -- All DOE Office Websites (Extended Search)

SOUTHWESTERN FEDERAL HYDROPOWER MEETING The Earl Cabell Federal Building 1100 Commerce Street Red River Room Floor 7, Room 752A Dallas, Texas June 12 - 13, 2013 Wednesday, June 12...

200

Microsoft Word - FINAL 2013 HydropowerCouncilAgenda 060513  

NLE Websites -- All DOE Office Websites (Extended Search)

Southwestern Federal Hydropower Council The Earl Cabell Federal Building 1100 Commerce Street Red River Room Floor 7, Room 752A Dallas, Texas June 11 - 12, 2013 Monday, June 10...

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Microsoft Word - FINAL 2010 Hydropower Council Agenda 052510...  

NLE Websites -- All DOE Office Websites (Extended Search)

AGENDA Southwestern Federal Hydropower Council Hilton Promenade at Branson Landing Branson, Missouri June 8 - 9, 2010 Tuesday, June 8 1:00 p.m. Welcome Little Rock District 1:05...

202

Microsoft Word - FINAL 2012HydropowerCouncilAgenda  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 Southwestern Federal Hydropower Council BLAKELY MOUNTAIN DAM PROJECT OFFICE Mountain Pine, Arkansas June 12 - 13, 2012 Tuesday, June 12 1:00 p.m. Welcome Vicksburg District...

203

Quantifying the Value of Hydropower in the Electric Grid  

Science Conference Proceedings (OSTI)

In an effort to quantify the full value of hydropower assets in a future electric grid, a team of researchers has looked at energy futures, regional markets, plant technologies, and operations. This report addresses the cost-side of the cost-benefit equation to be used when considering hydropower facility investments. It identifies construction and modification elements and estimates associated with costs for pumped storage, conventional hydro, and non-powered facilities. Cost data from original plant co...

2011-11-22T23:59:59.000Z

204

Using Environmental Solutions to Lubrication at Hydropower Plants: A Hydropower Technology Round-Up Report, Volume 1  

Science Conference Proceedings (OSTI)

Hydropower owners and operators are confronted with the dual challenge of compliance with continually-developing environmental regulations and increasingly vigorous competition in the electric generation market. Managing this challenge requires consideration and selected application of new and emerging strategies and technologies. This volume of EPRI's Hydropower Technology Roundup Report presents an overview of research, practices, lessons learned, and some examples regarding the use of self-lubricating...

1999-10-28T23:59:59.000Z

205

Conventional Hydropower Technologies (Fact Sheet), Wind And Water Power Program (WWPP)  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Power Water Power Program supports the development of technologies that harness the nation's renewable hydropower resources to generate environmentally sustainable and cost-effective electricity. Most conventional hydropower plants use a diver- sion structure, such as a dam, to capture water's potential energy via a turbine for electricity generation. The program's conventional hydropower activities focus on increasing generating capacity and efficiency at existing hydroelectric facilities, adding hydroelectric generating capacity to exist- ing non-powered dams, adding new low impact hydropower, increasing advanced pumped-storage hydropower capacity, and reducing potential environmental impacts of conven- tional hydropower production. The program's research and

206

Model Documentation for the MiniCAM  

SciTech Connect

The MiniCAM, short for the Mini-Climate Assessment Model, is an integrated assessment model of moderate complexity focused on energy and agriculture sectors. The model produces emissions of greenhouse gases (carbon dioxide, methane and nitrous oxide) and other radiatively important substances such as sulfur dioxide. Through incorporation of the simple climate model MAGICC, the consequences of these emissions for climate change and sea-level rise can be examined. The MiniCAM is designed to be fast and flexible.

Brenkert, Antoinette L.; Smith, Steven J.; Kim, Son H.; Pitcher, Hugh M.

2003-07-17T23:59:59.000Z

207

Commonwealth Hydropower Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grant Program Rebate Amount Design & Construction: 50% of costs or 1.00 per incremental kWh per year Feasibility study: 80% of costs Note: This program reopened March 15, 2013....

208

Cumulative biophysical impact of small and large hydropower development, Nu River, China  

E-Print Network (OSTI)

Cumulative biophysical impact of small and large hydropower development, Nu River, China Authors biophysical effects of small (China's Nu River basin, and compare effects The hydropower sector currently comprises eighty percent of global capacity for renewable energy generation

Tullos, Desiree

209

DOE: Quantifying the Value of Hydropower in the Electric Grid  

SciTech Connect

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms of energy, capacity, and ancillary services. Many potential improvements to existing hydropower plants were found to be cost-effective. Pumped storage is the most likely form of large new hydro asset expansions in the U.S. however, justifying investments in new pumped storage plants remains very challenging with current electricity market economics. Even over a wide range of possible energy futures, up to 2020, no energy future was found to bring quantifiable revenues sufficient to cover estimated costs of plant construction. Value streams not quantified in this study may provide a different cost-benefit balance and an economic tipping point for hydro. Future studies are essential in the quest to quantify the full potential value. Additional research should consider the value of services provided by advanced storage hydropower and pumped storage at smaller time steps for integration of variable renewable resources, and should include all possible value streams such as capacity value and portfolio benefits i.e.; reducing cycling on traditional generation.

None

2012-12-31T23:59:59.000Z

210

Best Practices Implementation for Hydropower Efficiency and Utilization Improvement  

SciTech Connect

By using best practices to manage unit and plant efficiency, hydro owner/operators can achieve significant improvements in overall plant performance, resulting in increased generation and profitability and, frequently, reduced maintenance costs. The Hydropower Advancement Project (HAP) was initiated by the Wind and Hydropower Technologies Program within the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy to develop and implement a systematic process with standard methodology, based on the best practices of operations, maintenance and upgrades; to identify the improvement opportunities at existing hydropower facilities; and to predict and trend the overall condition and improvement opportunity within the U.S. hydropower fleet. The HAP facility assessment includes both quantitative condition ratings and data-based performance analyses. However, this paper, as an overview document for the HAP, addresses the general concepts, project scope and objectives, best practices for unit and plant efficiency, and process and methodology for best practices implementation for hydropower efficiency and utilization improvement.

Smith, Brennan T [ORNL; Zhang, Qin Fen [ORNL; March, Patrick [Hydro Performance Processes, Inc.; Cones, Marvin [Mesa Associates, Inc.; Dham, Rajesh [U.S. Department of Energy; Spray, Michael [New West Technologies, LLC.

2012-01-01T23:59:59.000Z

211

Life Cycle Assessments Confirm the Need for Hydropower and Nuclear Energy  

DOE Green Energy (OSTI)

This paper discusses the use of life cycle assessments to confirm the need for hydropower and nuclear energy.

Gagnon, L.

2004-10-03T23:59:59.000Z

212

mini  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

measurement, precision versus accuracy, and range versus point values - refer to the DOE Fundamentals Handbook: Mathematics (Volume 1 of 2, DOE-HDBK-10141-92, June 1992, on the...

213

Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants  

DOE Green Energy (OSTI)

Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

Douglas G. Hall

2006-01-01T23:59:59.000Z

214

Evaluating functional displays for hydropower system: model-based guidance of scenario design  

Science Conference Proceedings (OSTI)

We discuss the human role in hydropower system control, noting how it is different from other supervisory control environments and noting the typical shortcomings in current displays provided to hydropower system controllers. We describe steps towards ... Keywords: Evaluation, Functional displays, Human control model, Human supervisory control, Hydropower system control, Scenario design, Situation awareness, Trust

Xilin Li; Penelope Sanderson; Rizah Memisevic; William Wong; Sanjib Choudhury

2006-10-01T23:59:59.000Z

215

Research on Fault Diagnosis of Hydropower Unit Based on Expert System and Hybrid Reasoning  

Science Conference Proceedings (OSTI)

With the rapid development of computer and monitoring technologies in recent years, more and more online monitoring equipment of hydropower units have been installed and applied in hydropower plants, and so began the long-term accumulation of data. Although ... Keywords: fault diagnosis, hydropower unit, expert system, hybrid reasoning

Ye Zhou; Luoping Pan

2012-05-01T23:59:59.000Z

216

Aleo Manali Hydropower Pvt Ltd | Open Energy Information  

Open Energy Info (EERE)

Manali Hydropower Pvt Ltd Manali Hydropower Pvt Ltd Jump to: navigation, search Name Aleo Manali Hydropower Pvt Ltd Place Kullu, Himachal Pradesh, India Zip 203001 Sector Hydro Product Himachal-based small hydro project developer. Coordinates 23.42796°, 84.91112° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":23.42796,"lon":84.91112,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

217

Solar, Wind, Hydropower: Home Renewable Energy Installations | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations Solar, Wind, Hydropower: Home Renewable Energy Installations April 17, 2013 - 1:44pm Addthis This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. This Lakewood, Colorado home was built in 1956. Brent and Mo Nelson upgraded the home with multiple solar technologies including; daylighting, passive solar and active solar. They also have an 80 gallon solar hot water heater. | Photo by Dennis Schroeder, National Renewable Energy Laboratory. Homeowner Andrea Mitchel, with installer Joe Guasti, proudly shows off small wind turbine installed in Oak Hills, CA. | Photo by Karin Sinclair, National Renewable Energy Laboratory.

218

EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation 933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA SUMMARY DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington.

219

Guide for Assessing Relicensing Risk for Hydropower Projects  

Science Conference Proceedings (OSTI)

Nearly two-thirds of hydropower projects relicensed between 1987 and 1991 lost both generating capacity and total annual energy; only one-tenth of relicensed projects showed any increase. This guide provides an overview of changes in relicensing and offers self-assessment guidelines for those utilities that are about to relicense their projects.

1993-11-01T23:59:59.000Z

220

Methodology and Process for Condition Assessment at Existing Hydropower Plants  

SciTech Connect

Hydropower Advancement Project was initiated by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy to develop and implement a systematic process with a standard methodology to identify the opportunities of performance improvement at existing hydropower facilities and to predict and trend the overall condition and improvement opportunity within the U.S. hydropower fleet. The concept of performance for the HAP focuses on water use efficiency how well a plant or individual unit converts potential energy to electrical energy over a long-term averaging period of a year or more. The performance improvement involves not only optimization of plant dispatch and scheduling but also enhancement of efficiency and availability through advanced technology and asset upgrades, and thus requires inspection and condition assessment for equipment, control system, and other generating assets. This paper discusses the standard methodology and process for condition assessment of approximately 50 nationwide facilities, including sampling techniques to ensure valid expansion of the 50 assessment results to the entire hydropower fleet. The application and refining process and the results from three demonstration assessments are also presented in this paper.

Zhang, Qin Fen [ORNL; Smith, Brennan T [ORNL; Cones, Marvin [Mesa Associates, Inc.; March, Patrick [Hydro Performance Processes, Inc.; Dham, Rajesh [U.S. Department of Energy; Spray, Michael [New West Technologies, LLC.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Ductless Mini-Split Air Conditioners | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ductless Mini-Split Air Conditioners Ductless Mini-Split Air Conditioners Ductless Mini-Split Air Conditioners August 9, 2012 - 4:05pm Addthis A ductless mini-split air conditioner is one solution to cooling part of a house. | Photo courtesy of ©iStockphoto/LUke1138. A ductless mini-split air conditioner is one solution to cooling part of a house. | Photo courtesy of ©iStockphoto/LUke1138. What does this mean for me? A ductless mini-split air conditioner is easier to install than a central air conditioning system. A ductless mini-split air conditioner provides zoned air conditioning without ducting. A ductless mini-split air conditioner is relatively easy to install and does not provide an entry point for intruders as some room air conditioners do. Ductless, mini split-system air-conditioners (mini splits) have numerous

222

Ductless Mini-Split Air Conditioners | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ductless Mini-Split Air Conditioners Ductless Mini-Split Air Conditioners Ductless Mini-Split Air Conditioners August 9, 2012 - 4:05pm Addthis A ductless mini-split air conditioner is one solution to cooling part of a house. | Photo courtesy of ©iStockphoto/LUke1138. A ductless mini-split air conditioner is one solution to cooling part of a house. | Photo courtesy of ©iStockphoto/LUke1138. What does this mean for me? A ductless mini-split air conditioner is easier to install than a central air conditioning system. A ductless mini-split air conditioner provides zoned air conditioning without ducting. A ductless mini-split air conditioner is relatively easy to install and does not provide an entry point for intruders as some room air conditioners do. Ductless, mini split-system air-conditioners (mini splits) have numerous

223

Fixed-Point Cell Mini Workshop  

Science Conference Proceedings (OSTI)

... The ITS-90 Fixed-Point Cell Mini-Workshop is scheduled to be given at ... hands-on" laboratory training in the realization of ITS-90 fixed-point cells. ...

2011-10-03T23:59:59.000Z

224

Feasibility assessment: Lake Frances power generation facilities for the city of Siloam Springs, Arkansas  

DOE Green Energy (OSTI)

The feasibility of developing the power potential of the Illinois River at the Lake Frances Dam for utilization by the city of Siloam Springs, Arkansas, was studied. It was found that the average annual power production potential of this site is 3.8 MWh; the cost saving produced by the proposed hydropower project will not support any remedial rehabilitation costs of the entire dam structure; development and operation of this hydropower project would save nonrenewal types of energy; if the capital cost can be fixed at present day prices, the development will become economically feasible when electric costs increase by 43%; and there will be no significant adverse environmental impact resulting from either the construction or operation of the hydropower facilities. It was concluded that the hydropower facilities should be constructed, owned and operated by the city of Siloam Springs, provided the dam safety can be assured and sources of funding can be made available so that the annual costs will not exceed the annual savings. (LCL)

None

1979-04-01T23:59:59.000Z

225

Small/low-head hydropower PRDA-1706 feasibility assessments. Executive summaries  

DOE Green Energy (OSTI)

Forty-nine papers were presented at the meeting. A separate abstract was prepared for each paper. (LCL)

Not Available

1979-05-01T23:59:59.000Z

226

Program to investigate the engineering feasibility of extracting energy from shallow magma bodies  

SciTech Connect

A new program, sponsored by the Department of Energy's Geothermal and Hydropower Technologies Division, has begun to investigate the engineering feasibility of extracting energy from shallow magma bodies. This program follows a previous investigation of the scientific feasibility of using magma and differs from it in focus. The current program is directed toward determining whether magma energy can be extracted economically. In the first year of the program, the three most promising sites for a long term experiment will be characterized; the research and development tasks that will be required will be identified; and a program plan outlining the entire feasibility study will be compiled.

Carson, C.C.; Allen, A.D.

1984-01-01T23:59:59.000Z

227

Top 10 Things You Didn't Know about Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Top 10 Things You Didn't Know about Hydropower Top 10 Things You Didn't Know about Hydropower Top 10 Things You Didn't Know about Hydropower April 19, 2013 - 3:49pm Addthis Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses. | Video by the Energy Department. Mike Reed Water Power Program Manager, Water Power Program LEARN MORE Stay up to date on hydropower, marine and hydrokinetic energy technologies by visiting energy.gov/water. This article is part of the Energy.gov series highlighting the "Top Things You Didn't Know About..." Be sure to check back for more entries soon. 10. Hydropower is one of the oldest power sources on the planet, generating power when flowing water spins a wheel or turbine. It was used by farmers as far back as ancient Greece for mechanical tasks like grinding grain.

228

Hydropower Potential in the Western U.S. | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Potential in the Western U.S. Hydropower Potential in the Western U.S. Energy Data Apps Maps Challenges Resources Blogs Let's Talk Energy Beta You are here Data.gov » Communities » Energy » Data Hydropower Potential in the Western U.S. Dataset Summary Description The dataset includes design elements, installed capacity, production capability, associated costs and cost -to-benefit ratios for nearly 200 water storing and conveying structures currently maintained by the Bureau of Reclamation. These data were used to support the internal study and report for assessing hydropower capability at 70 of Reclamation's existing facilities where hydropower has not been developed. The dataset can further be leveraged to support applications designed to provide a better understanding of our hydropower production potential and resource utilization.

229

Top 10 Things You Didn't Know about Hydropower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

about Hydropower about Hydropower Top 10 Things You Didn't Know about Hydropower April 19, 2013 - 3:49pm Addthis Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses. | Video by the Energy Department. Mike Reed Water Power Program Manager, Water Power Program LEARN MORE Stay up to date on hydropower, marine and hydrokinetic energy technologies by visiting energy.gov/water. This article is part of the Energy.gov series highlighting the "Top Things You Didn't Know About..." Be sure to check back for more entries soon. 10. Hydropower is one of the oldest power sources on the planet, generating power when flowing water spins a wheel or turbine. It was used by farmers as far back as ancient Greece for mechanical tasks like grinding grain.

230

PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS  

DOE Green Energy (OSTI)

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

Hadjerioua, Boualem [ORNL; Pasha, MD Fayzul K [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

2012-07-01T23:59:59.000Z

231

Hoopa Valley Small Scale Hydroelectric Feasibility Project  

DOE Green Energy (OSTI)

The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

Curtis Miller

2009-03-22T23:59:59.000Z

232

Quantifying the Value of Hydropower in the Electric Grid  

Science Conference Proceedings (OSTI)

Work reported in this Technical Update is part of a larger project that is made up of multiple components and intends to utilize and enhance tools that can apply and value hydropower assets in the changing electric grid. The project employs several industry analyses and modeling tools at the unit level, the plant level, the system level, and the regional/national level for quantifying the benefits provided to transmission grids by conventional and pumped storage hydroelectric projects. The research proje...

2011-05-24T23:59:59.000Z

233

Advanced Hydropower Turbine System Design for Field Testing  

Science Conference Proceedings (OSTI)

The Alden/Concepts NREC hydroturbine was initially developed under the U.S. Department of Energy's (DOE) Advanced Hydropower Turbine Systems Program. This design work was intended to develop a new runner that would substantially reduce fish mortality at hydroelectric projects, while developing power at efficiencies similar to competing hydroturbine designs. A pilot-scale test facility was constructed to quantify the effects of the conceptual turbine design on passing fish and to verify the hydraulic char...

2009-07-31T23:59:59.000Z

234

Specialized power-electronic apparatus for harnessing electrical power from kinetic hydropower plants.  

E-Print Network (OSTI)

??This thesis introduces a power electronic interface for a kinetic hydropower generation platform that enables extraction of electric power from a free-flowing water source such (more)

Mosallat, Farid

2012-01-01T23:59:59.000Z

235

Real Options in Small Hydropower Investments: An Empirical Study from Norway.  

E-Print Network (OSTI)

?? This empirical study examines investment behavior in small hydropower investments under uncertain electricity prices and revenues from selling so-called green certificates. We assess 73 (more)

Gravdehaug, Guro

2011-01-01T23:59:59.000Z

236

Microsoft Word - AR_2002 DOE Hydropower_Final_07_08.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

the environmental performance of hydropower projects by addressing problems such as fish mortality during passage through turbines, alteration of instream habitat, and water...

237

Microsoft PowerPoint - ACOE Regional HydroPower Conference Presentatio...  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL HYDROPOWER CONFERENCE Tulsa, Oklahoma June 10 - 11, 2009 NERC Requirements for Generator Owner and Operator Sarah M. Blankenship, NERC Compliance Officer How do we create a...

238

Improving performance via mini-applications.  

SciTech Connect

Application performance is determined by a combination of many choices: hardware platform, runtime environment, languages and compilers used, algorithm choice and implementation, and more. In this complicated environment, we find that the use of mini-applications - small self-contained proxies for real applications - is an excellent approach for rapidly exploring the parameter space of all these choices. Furthermore, use of mini-applications enriches the interaction between application, library and computer system developers by providing explicit functioning software and concrete performance results that lead to detailed, focused discussions of design trade-offs, algorithm choices and runtime performance issues. In this paper we discuss a collection of mini-applications and demonstrate how we use them to analyze and improve application performance on new and future computer platforms.

Crozier, Paul Stewart; Thornquist, Heidi K.; Numrich, Robert W. (University of Minnesota, Minneapolis, MN); Williams, Alan B.; Edwards, Harold Carter; Keiter, Eric Richard; Rajan, Mahesh; Willenbring, James M.; Doerfler, Douglas W.; Heroux, Michael Allen

2009-09-01T23:59:59.000Z

239

'NMR on a Chip' Features NIST Magnetic Mini-Sensor  

Science Conference Proceedings (OSTI)

... of Standards and Technology (NIST) can detect nuclear magnetic resonance ... NIST Mini-Sensor May Have Biomedical and Security Applications). ...

2011-07-19T23:59:59.000Z

240

Decentralized-coordinated model predictive control for a hydro-power valley  

Science Conference Proceedings (OSTI)

This paper aims at improving control systems for hydro-power production, by combining model predictive control techniques with decomposition-coordination methods for a global optimization over a whole hydro-power valley. It first recalls the model predictive ... Keywords: Case-study validation, Control optimization, Decomposition-coordination, Hydroelectricity, Model predictive control

J. ZRate FlRez, J. Martinez, G. BesanOn, D. Faille

2013-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Real-time optimization of a cascaded reservoirs hydropower plant based on fuzzy logic  

Science Conference Proceedings (OSTI)

One of the important industrial areas that involve complex nonlinear dynamics, control problems, and difficult optimization tasks is that of cascaded reservoirs hydropower plants. For the purpose of minimizing the non-hydraulic power production expenses ... Keywords: cascaded reservoirs, fuzzy logic, hydropower, nonlinear control, optimization

M. Mahmoud; K. Dutton

2007-03-01T23:59:59.000Z

242

Research on Spatial Object-oriented Management Information System for Hydropower Station Project  

Science Conference Proceedings (OSTI)

In order to intuitive and meticulous manage the hydropower station project construction, in view of the current commonly-used project management systems of the contract-oriented system and the schedule-oriented system, a spatial object-oriented project ... Keywords: spatial object-oriented, hydropower station project, information management system

Cai Hualong; Zhang Qing; Hu Zhigen; Fan Jiming

2012-08-01T23:59:59.000Z

243

OPAH a model for optimal design of multipurpose small hydropower plants  

Science Conference Proceedings (OSTI)

The investment in small hydropower plants requires the analysis of hydrological, technical, operational, budgetary, economical and financial aspects. The analysis of each possible configuration demands the joint action of several technicians, consuming ... Keywords: Design optimization, Economical and financial risk analysis, Multipurpose NLP optimization, Small hydropower

J. P. P. G. Lopes de Almeida; A. G. Henri Lejeune; J. A. A. S Marques; M. Conceio Cunha

2006-04-01T23:59:59.000Z

244

Research and Practice of Hydropower Engineering Construction Project ERP System Based on B/S  

Science Conference Proceedings (OSTI)

This paper introduces the structural model and the operating principle of B/S model together with the notion of system concept and the architecture of ERP. According to the requirements of the Water Conservancy and Hydropower Engineering Construction ... Keywords: ERP, Hydropower Engineering, Thematic maps

Xuelian Yan; Changjun Zhu; Qing Yu Zhou

2009-12-01T23:59:59.000Z

245

Integrating Green Hydropower Certification with Strategy Environment Assessment: Towards Sustainable River Basin Development in Yunnan, China  

Science Conference Proceedings (OSTI)

China currently put the development of its western region as one of the most important goals. This greatly stimulated the initiative of hydropower development in its ecological sensitive Yunnan Province. Yet the use of a single tool, like strategy environment ... Keywords: strategic environmental assessment (SEA), green hydropower certification, sustainable river basin development, Yunnan Province

Peng Shengjing; Sun Zhenhua; Ou Xiaokun

2012-07-01T23:59:59.000Z

246

Optimal Scheduling of Cascade Hydropower System Using Grouping Differential Evolution Algorithm  

Science Conference Proceedings (OSTI)

For the complex problem of cascade hydropower system optimal scheduling, a novel grouping differential evolution algorithm (GDE) is proposed in this paper by hybridizing differential evolution (DE) and shuffled frog leaping (SFL). In the proposed algorithm, ... Keywords: cascade hydropower system, optimal scheduling, differential evolution, shuffled frog leaping

Yinghai Li; Jian Zuo

2012-03-01T23:59:59.000Z

247

Effect Analysis of Regulation Mode on Small Disturbance Stability in Hydropower Stations  

Science Conference Proceedings (OSTI)

In the previous stability analysis under small disturbance of the hydropower stations, there are some different regulation modes to be used. In order to analyze the regulation performance accurately and the effect of different regulation modes on system ... Keywords: hydropower station, power regulation, frequency regulation, small disturbance, regulation performance

Zhou Jianxu; Hu Rong; Cao Qing

2009-10-01T23:59:59.000Z

248

Small Hydropower Systems: Energy Efficiency and Renewable Energy Clearinghouse (EREC) Fact Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

you're considering building a small you're considering building a small hydropower system on water flowing through your property, you have a long tradition from which to draw your inspi- ration. Two thousand years ago, the Greeks learned to harness the power of running water to turn the massive wheels that rotated the shafts of their wheat flour grinders. And in the hydropower heyday of the 18th century, thousands of towns and cities worldwide were located around small hydropower sites. Today, small hydropower projects offer emissions-free power solutions for many remote communities throughout the world-such as those in Nepal, India, China, and Peru-as well as for highly industrialized countries, like the United States. This fact sheet will help you determine whether a small hydropower system will

249

Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydropower Upgrades to Yield Added Generation at Average Costs Less Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams November 4, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Energy Secretary Steven Chu today announced up to $30.6 million in Recovery Act funding for the selection of seven hydropower projects that modernize hydropower infrastructure by increasing efficiency and reducing environmental impacts at existing facilities. The expanded hydro generation projects have estimated incremental costs of less than 4 cents per kWh on average. The selections announced today will deploy innovative technologies such as high-efficiency, fish-friendly turbines, improved water intakes, and

250

Effects of Flaming Gorge Dam hydropower operations on downstream flow, stage, and sediment transport  

DOE Green Energy (OSTI)

Hydropower operations at Flaming Gorge Dam, located on the Green River in Utah, can produce rapid downstream changes in flow and stage. These changes can in turn affect sediment transport and ecologic resources below the dam. To evaluate these effects, four hydropower operational scenarios with varying degrees of hydropower-release fluctuations were examined. This study demonstrates that the combined use of river-flow routing, water-surface profile, and sediment-transport models can provide useful information for evaluating the potential impacts of hydropower-operations on ecological and other resources downstream of the dam. Study results show that flow fluctuations may or may not persist for a long distance, depending on the initial magnitude of fluctuation and the duration of hydropower peaking. Stage fluctuations depend not only on flow fluctuations but also on river channel characteristics, such as channel width and longitudinal slope.

Yin, S.C.L.; Tomasko, D.; Cho, H.E.; Williams, G. [Argonne National Lab., IL (United States); McCoy, J.; Palmer, C. [USDOE Western Area Power Administration, Salt Lake City, UT (United States)

1996-11-01T23:59:59.000Z

251

DOE Hydropower Program biennial report 1996-1997 (with an updated annotated bibliography)  

DOE Green Energy (OSTI)

This report, the latest in a series of biennial Hydropower Program reports sponsored by the US Department of Energy, summarizes the research and development and technology transfer activities of fiscal years 1996 and 1997. The report discusses the activities in the six areas of the hydropower program: advanced hydropower turbine systems; environmental research; hydropower research and development; renewable Indian energy resources; resource assessment; and technology transfer. The report also includes an annotated bibliography of reports pertinent to hydropower, written by the staff of the Idaho National Engineering and Environmental Laboratory, Oak Ridge National Laboratory, Federal and state agencies, cities, metropolitan water districts, irrigation companies, and public and independent utilities. Most reports are available from the National Technical Information Service.

Rinehart, B.N.; Francfort, J.E.; Sommers, G.L. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Cada, G.F.; Sale, M.J. [Oak Ridge National Lab., TN (United States)

1997-06-01T23:59:59.000Z

252

Water Energy Resource Data from Idaho National Laboratory's Virtual Hydropower Prospector  

DOE Data Explorer (OSTI)

The mission of the U.S. Department of Energy's (DOE's) Hydropower Program is to conduct research and development (R&D) that will improve the technical, societal, and environmental benefits of hydropower and provide cost-competitive technologies that enable the development of new and incremental hydropower capacity, adding diversity to the nation's energy supply. The Virtual Hydropower Prospector is a GIS application to locate and evaluate natural stream water energy resources. In the interactive data map the U.S. is divided into 20 hydrologic regions. The Prospector tool applies an analytical process to determine the gross power potential of these regions and helps users to site potential hydropower projects.

253

MHK Technologies/Kinetic Hydropower System KHPS | Open Energy Information  

Open Energy Info (EERE)

Kinetic Hydropower System KHPS Kinetic Hydropower System KHPS < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Verdantpower.jpg Technology Profile Primary Organization Verdant Power Project(s) where this technology is utilized *MHK Projects/Roosevelt Island Tidal Energy RITE *MHK Projects/Cornwall Ontario River Energy CORE Technology Resource Click here Current/Tidal Technology Type Click here Axial Flow Turbine Technology Readiness Level Click here TRL 7/8: Open Water System Testing & Demonstration & Operation Technology Description Verdant Power's central technology is the Kinetic Hydropower System (KHPS), a water-to-wire system that consists of three main components: 1) KHPS TURBINE: a three-bladed horizontal-axis turbine with four major assemblies: a) Composite rotor with 3-fixed blades that rotate at the relatively slow and constant speed of approximately 40 RPM, with tip-speeds of 35 feet per second. This is well below normal water vessel propeller speeds and conventional hydropower turbine blade speeds. b) Sealed nacelle, pylon and passive yaw mechanism that is hydrodynamically designed to allow the turbine to self-rotate into the prevailing current (like a weathervane) so that the blades are optimally aligned to generate energy. c) Custom-designed drivetrain unit (with induction generator) enclosed within the nacelle that integrates the bearing housing with a special long-life planetary gearbox, with mechanical shaft seals and a minimum of sealed lubricants. d) Streambed mounting system that can vary depending on site conditions as a single drilled monopile, a single gravity-based structure, or a gravity-based triframe mount that supports 3 turbines. 2) UNDERWATER CABLING: low-voltage shielded cable of short distance; and shoreline switchgear vaults, control room, and interconnection point(s). 3) APPURTENANT FACILITIES: for navigation safety, such as Public Aides to Navigation (PATON) buoys and lighted warning signs, as well as instrumentation including Acoustic Doppler Current Profilers (ADCPs). In order to maximize the application of the KHPS within the global MHK resource, Verdant Power has designed the technology as a simple and uniquely scalable system that can be operated in tidal, river and ocean current settings. Possible KHPS installations range from distributed generation arrangements in near-shore urban and village settings to base power generation at offshore deepwater locales.

254

Ductless, Mini-Split Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ductless, Mini-Split Heat Pumps Ductless, Mini-Split Heat Pumps Ductless, Mini-Split Heat Pumps June 24, 2012 - 4:19pm Addthis What does this mean for me? You can take advantage of the fact that -- unlike earlier versions -- newer models of ductless mini-split heat pumps operate effectively in cold temperatures. If you are building an addition or doing a major remodel and your home does not have heating and cooling ducts, a ductless mini-split heat pump may be a cost-effective, energy-efficient choice. Ductless, mini-split-system heat pumps (mini splits) make good retrofit add-ons to houses with "non-ducted" heating systems, such as hydronic (hot water heat), radiant panels, and space heaters (wood, kerosene, propane). They can also be a good choice for room additions where extending or

255

UC/APS Mini-Symposium  

NLE Websites -- All DOE Office Websites (Extended Search)

UC/APS Mini-Symposium UC/APS Mini-Symposium Host: Ali Khounsary December 10, 2003 Room A1100 APS, Argonne National Laboratory UC Program for Research in Cell Injury and Repair Alteration of cellular proteins or organelles due to reactive chemicals or high-energy physical stresses represents the most common mechanism of tissue injury leading to tissue necrosis. Diseases such as myocardial infarction, cerebrovascular stroke, cerebral palsy, burns, electrical shock, and acute radiation poisoning are examples. The success of modern gene therapy also depends on repair of the cell membrane after insertion of new genetic material. When normal cellular repair functions are incapable of managing the cell injury, pharmaceutical intervention can be lifesaving. The mission of the Center for Molecular Repair is to investigate strategies

256

Hoopa Valley Small Scale Hydroelectric Feasibility Project  

Science Conference Proceedings (OSTI)

This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

Curtis Miller

2009-03-22T23:59:59.000Z

257

16 R&D Projects Across 11 States to Advance Hydropower in U.S. | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 R&D Projects Across 11 States to Advance Hydropower in U.S. 6 R&D Projects Across 11 States to Advance Hydropower in U.S. 16 R&D Projects Across 11 States to Advance Hydropower in U.S. September 6, 2011 - 3:38pm Addthis Rajesh Dham Hydropower Technology Team Lead Today, Secretary Chu announced that the Energy Department is funding 16 projects that will make hydropower production even more efficient, cost-effective and environmentally friendly. These research projects will help advance hydropower technologies - providing clean power to Americans while creating jobs. Hydropower technologies capture water's potential energy via a turbine to generate electricity. It is the nation's largest, most reliable, and least expensive source of renewable power generation. Companies, universities, national laboratories, and local governments

258

EPRI-DOE Conference on Environmentally- Enhanced Hydropower Turbines: Technical Papers  

SciTech Connect

The EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines was a component of a larger project. The goal of the overall project was to conduct the final developmental engineering required to advance the commercialization of the Alden turbine. As part of this effort, the conference provided a venue to disseminate information on the status of the Alden turbine technology as well as the status of other advanced turbines and research on environmentally-friendly hydropower turbines. The conference was also a product of a federal Memorandum of Understanding among DOE, USBR, and USACE to share technical information on hydropower. The conference was held in Washington, DC on May 19 and 20, 2011 and welcomed over 100 attendees. The Conference Organizing Committee included the federal agencies with a vested interest in hydropower in the U.S. The Committee collaboratively assembled this conference, including topics from each facet of the environmentally-friendly conventional hydropower research community. The conference was successful in illustrating the readiness of environmentally-enhanced hydropower technologies. Furthermore, the topics presented illustrated the need for additional deployment and field testing of these technologies in an effort to promote the growth of environmentally sustainable hydropower in the U.S. and around the world

None

2011-12-01T23:59:59.000Z

259

Microsoft PowerPoint - SW Regional Hydropower Conference - June 2007.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

of Engineers® of Engineers® Vision Statement Vision Statement Be the premier stewards of entrusted hydropower resources US Army Corps of Engineers® Mission Statement Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles, in partnership with other Federal hydropower generators, the Power Marketing Administrations, and Preference Customers, to benefit the Nation. US Army Corps of Engineers® Mission Statement Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles, in partnership with other Federal hydropower generators, the Power Marketing Administrations, and Preference Customers, to benefit the Nation. US Army Corps

260

DOE Hydropower Program biennial report 1992--1993 (with an updated annotated bibliography)  

SciTech Connect

This report, the latest in a series of annual/biennial Hydropower Program reports sponsored by the US Department of Energy, summarizes the research and development and technology transfer activities of fiscal years 1992 and 1993. The report discusses the activities in the four areas of the hydropower program: Environmental research; resource assessment; research coat shared with industry; and technology transfer. The report also offers an annotated bibliography of reports pertinent to hydropower, written by persons in Federal and state agencies, cities, metropolitan water districts, irrigation companies, and public and independent utilities. Most reports are available from the National Technical Information Service.

Cada, G.F.; Sale, M.J. [Oak Ridge National Lab., TN (United States); Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1993-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DOE Hydropower Program biennial report 1994--1995 with an updated annotated bibliography  

DOE Green Energy (OSTI)

This report, the latest in a series of annual/biennial Hydropower Program reports sponsored by the US Department of Energy, summarizes the research and development and technology transfer activities of fiscal years 1994 and 1995. The report discusses the activities in the four areas of the hydropower program: Environmental Research; Resource Assessment; Research Cost-Shared with Industry; and Technology Transfer. The report also includes an annotated bibliography of reports pertinent to hydropower, written by the staff of the Idaho National Engineering Laboratory, Oak Ridge National Laboratory, Federal and state agencies, cities, metropolitan water districts, irrigation companies, and public and independent utilities. Most reports are available from the National Technical Information Service.

Rinehart, B.N.; Francfort, J.E.; Sommers, G.L. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Cada, G.F.; Sale, M.J. [Oak Ridge National Lab., TN (United States)

1995-05-01T23:59:59.000Z

262

DOE Hydropower Program biennial report 1990--1991 (with updated annotated bibliography)  

DOE Green Energy (OSTI)

This report summarizes the activities of the US Department of Energy's (DOE) Hydropower Program for fiscal years 1990 and 1991, and provides an annotated bibliography of research, engineering, operations, regulations, and costs of projects pertinent to hydropower development. The Hydropower Program is organized as follows: background (including Technology Development and Engineering Research and Development); Resource Assessment; National Energy Strategy; Technology Transfer; Environmental Research; and, the bibliography discusses reports written by both private and non-Federal Government sectors. Most reports are available from the National Technical Information Service. 5 figs., 2 tabs.

Chappell, J.R.; Rinehart, B.N.; Sommers, G.L. (Idaho National Engineering Lab., Idaho Falls, ID (United States)); Sale, M.J. (Oak Ridge National Lab., TN (United States))

1991-07-01T23:59:59.000Z

263

Mini Grid Renewable Energy-Financing Mechanisms | Open Energy Information  

Open Energy Info (EERE)

Mini Grid Renewable Energy-Financing Mechanisms Mini Grid Renewable Energy-Financing Mechanisms Jump to: navigation, search Tool Summary Name: Mini Grid Renewable Energy-Financing Mechanisms Agency/Company /Organization: World Bank Sector: Energy Focus Area: Renewable Energy Topics: Finance Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, References: Mini Grid Renewable Energy-Financing Mechanisms[1] Resources Rural Electrification, Micro-finance and Micro and Small Business (MSB) Development: Lessons for the Nicaragua Off-grid Rural Electrification Project, ESMAP, M. Motta and K. Reiche. References ↑ "Mini Grid Renewable Energy-Financing Mechanisms" Retrieved from "http://en.openei.org/w/index.php?title=Mini_Grid_Renewable_Energy-Financing_Mechanisms&oldid=328980

264

Mini Pulsed Plasma Source - Lawrence Berkeley National Laboratory  

The mini-pulsed plasma source will find use in ion source applications including heavy ion fusion, particle accelerators, and Electron Beam Ion Source ...

265

Energy Basics: Ductless, Mini-Split Heat Pumps  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Systems Air-Source Heat Pumps Ductless Mini-Split Heat Pumps Absorption Heat Pumps Geothermal Heat Pumps Supporting Equipment for Heating & Cooling Systems Water Heating...

266

NIST / ITS-90 Fixed-Point Cell Mini-Workshop  

Science Conference Proceedings (OSTI)

Page 1. NIST / ITS-90 Fixed-Point Cell Mini-Workshop NIST, Building 221, Room B005, Gaithersburg, MD 20899 November ...

2013-08-12T23:59:59.000Z

267

Better Mini-Batch Algorithms via Accelerated Gradient Methods  

E-Print Network (OSTI)

Better Mini-Batch Algorithms via Accelerated Gradient Methods Andrew Cotter Toyota Technological Toyota Technological Institute at Chicago nati@ttic.edu Karthik Sridharan Toyota Technological Institute

268

Coal Fuels Alliance: Design and Construction of Early Lead Mini...  

NLE Websites -- All DOE Office Websites (Extended Search)

Coal Fuels Alliance: Design and Construction of Early Lead Mini Fischer-Tropsch Refinery University of Kentucky Center for Applied Energy Research (CAER) Project Number: NT0005988...

269

File:Federal Hydropower - Southwestern Power Administration.pdf | Open  

Open Energy Info (EERE)

Administration.pdf Administration.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Southwestern Power Administration.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 715 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:35, 22 May 2013 Thumbnail for version as of 15:35, 22 May 2013 1,275 × 1,650, 2 pages (715 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage

270

Development of environmentally advanced hydropower turbine system design concepts  

DOE Green Energy (OSTI)

A team worked together on the development of environmentally advanced hydro turbine design concepts to reduce hydropower`s impact on the environment, and to improve the understanding of the technical and environmental issues involved, in particular, with fish survival as a result of their passage through hydro power sites. This approach brought together a turbine design and manufacturing company, biologists, a utility, a consulting engineering firm and a university research facility, in order to benefit from the synergy of diverse disciplines. Through a combination of advanced technology and engineering analyses, innovative design concepts adaptable to both new and existing hydro facilities were developed and are presented. The project was divided into 4 tasks. Task 1 investigated a broad range of environmental issues and how the issues differed throughout the country. Task 2 addressed fish physiology and turbine physics. Task 3 investigated individual design elements needed for the refinement of the three concept families defined in Task 1. Advanced numerical tools for flow simulation in turbines are used to quantify characteristics of flow and pressure fields within turbine water passageways. The issues associated with dissolved oxygen enhancement using turbine aeration are presented. The state of the art and recent advancements of this technology are reviewed. Key elements for applying turbine aeration to improve aquatic habitat are discussed and a review of the procedures for testing of aerating turbines is presented. In Task 4, the results of the Tasks were assembled into three families of design concepts to address the most significant issues defined in Task 1. The results of the work conclude that significant improvements in fish passage survival are achievable.

Franke, G.F.; Webb, D.R.; Fisher, R.K. Jr. [Voith Hydro, Inc. (United States)] [and others

1997-08-01T23:59:59.000Z

271

File:Federal Hydropower - Department of Energy.pdf | Open Energy...  

Open Energy Info (EERE)

Department of Energy.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Department of Energy.pdf Size of this preview: 463 599...

272

Climate Change Effects on Hydropower Potential in the Alcantara River Basin in Sicily (Italy)  

Science Conference Proceedings (OSTI)

In recent years, increasing attention has been paid to hydropower generation, since it is a renewable, efficient, and reliable source of energy, as well as an effective tool to reduce the atmospheric concentrations of greenhouse gases resulting ...

G. T. Aronica; B. Bonaccorso

2013-09-01T23:59:59.000Z

273

Climate change effects on hydropower potential in the Alcantara river basin in Sicily (Italy)  

Science Conference Proceedings (OSTI)

In recent years an increasing attention has been paid to hydropower generation, since it is a renewable, efficient, and reliable source of energy, as well as an effective tool to reduce the atmospheric concentrations of greenhouse gases resulting ...

G. T. Aronica; B. Bonaccorso

274

Wind Power Today: Building a New Energy Future, Wind and Hydropower Technologies Program 2009 (Brochure)  

DOE Green Energy (OSTI)

Wind Power Today is an annual publication that provides an overview of the wind energy research conducted by the U.S. Department of Energy Wind and Hydropower Technologies Program.

Not Available

2009-04-01T23:59:59.000Z

275

Identification of undeveloped hydropower resources in the United States based on environmental, legal, and institutional attributes  

DOE Green Energy (OSTI)

The Hydropower Evaluation Software (HES) is used to model the undeveloped hydropower potential in the US. It was developed for the US Department of Energy (DOE) by the Idaho National Engineering and Environmental Laboratory (INEEL) in response to National Energy Strategy requirements. The HES models the environmental, legal, and institutional attributes present at potential hydropower sites, and calculates a regional or state total of the undeveloped hydropower potential. The site attributes and characteristics can be entered into the menu-driven model on a site-by-site basis, as well as downloaded from existing information sources such as the Federal Energy Regulatory Commission`s (FERC) Hydroelectric Power Resources Assessment Inventory and the Department of Interior`s National Rivers Inventory.

Francfort, J.E.; Conner, A.M.

1997-08-01T23:59:59.000Z

276

Low Head/Low Power Hydropower Resource Assessment of the Pacific Northwest Hydrologic Region  

E-Print Network (OSTI)

An analytical assessment of the hydropower potential of the Pacific Northwest Hydrologic Region was performed using state-of-the-art digital elevation models and geographic information system tools. The principal focus of the study was the amount of low head (less than 30 ft)/low power (less than 1 MW) potential in the region and the fractions of this potential that corresponded to the operating envelopes of three classes of hydropower technologies: conventional turbines, unconventional systems, and microhydro (less than 100 kW) technologies. To obtain these estimates, the hydropower potential of all the stream segments in the region, which averaged 2 miles in length, were calculated. These calculations were performed using hydrography and hydraulic heads that were obtained from the U.S. Geological Surveys Elevation Derivatives for National Applications dataset and stream flow predictions from a regression equation developed specifically for the region. Stream segments excluded from development and developed hydropower in the

Power Hydropower; Douglas G. Hall; Gregory R. Carroll; Shane J. Cherry; Y D. Lee; Garold L. Sommers

2002-01-01T23:59:59.000Z

277

Data-Based Performance Assessments for the DOE Hydropower Advancement Project  

SciTech Connect

The U. S. Department of Energy s Hydropower Advancement Project (HAP) was initiated to characterize and trend hydropower asset conditions across the U.S.A. s existing hydropower fleet and to identify and evaluate the upgrading opportunities. Although HAP includes both detailed performance assessments and condition assessments of existing hydropower plants, this paper focuses on the performance assessments. Plant performance assessments provide a set of statistics and indices that characterize the historical extent to which each plant has converted the potential energy at a site into electrical energy for the power system. The performance metrics enable benchmarking and trending of performance across many projects in a variety contexts (e.g., river systems, power systems, and water availability). During FY2011 and FY2012, assessments will be performed on ten plants, with an additional fifty plants scheduled for FY2013. This paper focuses on the performance assessments completed to date, details the performance assessment process, and describes results from the performance assessments.

March, Patrick [Hydro Performance Processes, Inc.; Wolff, Dr. Paul [WolffWare Ltd.; Smith, Brennan T [ORNL; Zhang, Qin Fen [ORNL; Dham, Rajesh [U.S. Department of Energy

2012-01-01T23:59:59.000Z

278

"Fish Friendly" Hydropower Turbine Development and Deployment: Alden Turbine Preliminary Engineering and Model Testing  

Science Conference Proceedings (OSTI)

This report presents the results of a collaborative research project funded by the Electric Power Research Institute (EPRI), the U.S. Department of Energy (DOE), and hydropower industry partners with the objective of completing the remaining developmental engineering required for a "fish-friendly" hydropower turbine called the Alden turbine. Earlier engineering and research that was started in 1995 and completed in 2008 established a viable conceptual design. Additional engineering completed in 2009 and ...

2011-10-07T23:59:59.000Z

279

Field test of ultra-low head hydropower package based on marine thrusters. Final report  

DOE Green Energy (OSTI)

The project includes the design, fabrication, assembly, installation, and field test of the first full-scale operating hydropower package (turbine, transmission, and generator) based on a design which incorporates a marine-thruster as the hydraulic prime mover. Included here are: the project overview; engineering design; ultra-low head hydropower package fabrication; component procurement, cost control, and scheduling; thruster hydraulic section installation; site modeling and resulting recommended modifications; testing; and baseline environmental conditions at Stone Drop. (MHR)

Not Available

1983-12-01T23:59:59.000Z

280

Steel Penstock Coating and Lining Rehabilitation: A Hydropower Technology Roundup Report, Volume 3  

Science Conference Proceedings (OSTI)

Steel penstocks and the coating and lining systems that enhance their structural integrity and serviceability are part of the infrastructure for a majority of the world's hydroelectric projects. This Hydropower Technology Roundup report aims to provide managers and technical staff responsible for hydropower plants with up-to-date information to enable them to assess the need for and implement the cost-effective rehabilitation of steel penstock coatings and linings.

2000-08-04T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Quantifying the Value of Hydropower in the Electric Grid: Modeling Results for Future Scenarios  

Science Conference Proceedings (OSTI)

Work reported in this Technical Report is part of a larger study that is made up of multiple components and intends to utilize and enhance tools that can value hydropower assets in a changing electric grid. The studys main objective is to develop a methodology to facilitate improved valuation and resource planning for pumped storage and conventional hydropower projects in the future electric transmission grid.This report covers Modeling Results for Future Electricity Market ...

2012-12-31T23:59:59.000Z

282

The ASTRI Mini-Array Science Case  

E-Print Network (OSTI)

ASTRI is a Flagship Project financed by the Italian Ministry of Education, University and Research, and led by INAF, the Italian National Institute of Astrophysics. Within this framework, INAF is currently developing an end-to-end prototype of a Small Size Telescope in a dual-mirror configuration (SST-2M) for the Cherenkov Telescope Array (CTA), scheduled to start data acquisition in 2014. Although the ASTRI SST-2M prototype is mainly a technological demonstrator, it will perform scientific observations of the Crab Nebula, Mrk 421 and Mrk 501 at E>1 TeV. A remarkable improvement in terms of performance could come from the operation, in 2016, of a SST-2M mini-array, composed of a few SST-2M telescopes to be placed at final CTA Southern Site. The SST mini-array will be able to study in great detail relatively bright sources (a few x 10E-12 erg/cm2/s at 10 TeV) with angular resolution of a few arcmin and energy resolution of about 10-15%. Thanks to the stereo approach, it will be possible to verify the wide field of view (FoV) performance through the detections of very high-energy showers with core located at a distance up to 500 m, to compare the mini-array performance with the Monte Carlo expectations by means of deep observations of selected targets, and to perform the first CTA science at the beginning of the mini-array operations. Prominent sources such as extreme blazars, nearby well-known BL Lac objects and radio-galaxies, galactic pulsar wind nebulae, supernovae remnants, micro-quasars, and the Galactic Center can be observed in a previously unexplored energy range, in order to investigate the electron acceleration and cooling, relativistic and non relativistic shocks, the search for cosmic-ray (CR) Pevatrons, the study of the CR propagation, and the impact of the extragalactic background light on the spectra of the sources.

S. Vercellone; G. Agnetta; L. A. Antonelli; D. Bastieri; G. Bellassai; M. Belluso; C. Bigongiari; S. Billotta; B. Biondo; G. Bonanno; G. Bonnoli; P. Bruno; A. Bulgarelli; R. Canestrari; M. Capalbi; P. Caraveo; A. Carosi; E. Cascone; O. Catalano; M. Cereda; P. Conconi; V. Conforti; G. Cusumano; V. De Caprio; A. De Luca; A. Di Paola; F. Di Pierro; D. Fantinel; M. Fiorini; D. Fugazza; D. Gardiol; M. Ghigo; F. Gianotti; S. Giarrusso; E. Giro; A. Grillo; D. Impiombato; S. Incorvaia; A. La Barbera; N. La Palombara; V. La Parola; G. La Rosa; L. Lessio; G. Leto; S. Lombardi; F. Lucarelli; M. C. Maccarone; G. Malaguti; G. Malaspina; V. Mangano; D. Marano; E. Martinetti; R. Millul; T. Mineo; A. Misto'; C. Morello; G. Morlino; M. R. Panzera; G. Pareschi; G. Rodeghiero; P. Romano; F. Russo; B. Sacco; N. Sartore; J. Schwarz; A. Segreto; G. Sironi; G. Sottile; A. Stamerra; E. Strazzeri; L. Stringhetti; G. Tagliaferri; V. Testa; M. C. Timpanaro; G. Toso; G. Tosti; M. Trifoglio; P. Vallania; V. Zitelli; F. Tavecchio

2013-07-22T23:59:59.000Z

283

Boosting the Feasibility Pump  

E-Print Network (OSTI)

Although Hillier (1969) does not provide an explicit characterization of .... The end point does not need to be feasible ...... Handbook of Constraint Programming

284

MiniBooNE Oscillation Results 2011  

SciTech Connect

The MiniBooNE neutrino oscillation search experiment at Fermilab has recently updated results from a search for {bar {nu}}{sub {mu}} {yields} {bar {nu}}{sub e} oscillations, using a data sample corresponding to 8.58 x 10{sup 20} protons on target in anti-neutrino mode. This high statistics result represent an increase in statistics of 52% compared to result published in 2010. An excess of 57.7 {+-} 28.5 events is observed in the energy range 200 MeV < E{sub {nu}} < 3000 MeV. The data favor LSND-like {bar {nu}}{sub {mu}} {yields} {bar {nu}}{sub e} oscillations over a background only hypothesis at 91.1% confidence level in the energy range 475 < E{sub {nu}} < 3000 MeV.

Djurcic, Zelimir

2012-01-01T23:59:59.000Z

285

Mini-Optics Solar Energy Concentrator  

E-Print Network (OSTI)

This invention deals with the broad general concept for focussing light. A mini-optics tracking and focussing system is presented for solar power conversion that ranges from an individual's portable system to solar conversion of electrical power that can be used in large scale power plants for environmentally clean energy. It can be rolled up, transported, and attached to existing man-made, or natural structures. It allows the solar energy conversion system to be low in capital cost and inexpensive to install as it can be attached to existing structures since it does not require the construction of a superstructure of its own. This novel system is uniquely distinct and different from other solar tracking and focussing processes allowing it to be more economical and practical. Furthermore, in its capacity as a power producer, it can be utilized with far greater safety, simplicity, economy, and efficiency in the conversion of solar energy.

Mark Davidson; Mario Rabinowitz

2003-09-12T23:59:59.000Z

286

Historical Perspective on the U.S. Department of Energy's Hydropower Program  

Science Conference Proceedings (OSTI)

For 30 years, the U.S. Department of Energy supported unique research and development activities focused on improving the domestic hydropower industry. In the 1970s and early 1980s, DOEs Hydropower Program focused on technology assessment and a Small Hydropower Demonstration Program. After a period of zero funding in the late 1980s, the Program restarted with the goal of developing new technology that would improve the environmental performance of hydropower projects. A unique partnership of industry and federal cost-sharing allowed the Advanced Hydropower Turbine Systems activity to be established in 1994 this led to new fish-friendly turbine designs and testing. Interagency cooperation with organizations like the U.S. Army Corps of Engineers has been a consistent part of the Program, along with scientific leadership and technical expertise from three of DOEs National Laboratories: INL, ORNL, and PNNL. Program accomplishments include several new turbine designs, biological design criteria, computational and physical modeling, and environmental sensors. In contrast to other R&D on fish passage at dams, the DOE-sponsored research has focused on making the path through the turbine safer.

Sale, Michael J.; Cada, G. F.; Dauble, Dennis D.

2006-08-01T23:59:59.000Z

287

Estimating the Effects of Climate Change on Federal Hydropower and Power Marketing  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy is currently preparing an assessment of the effects of climate change on federal hydropower, as directed by Congress in Section 9505 of the Secure Water Act of 2009 (P.L. 111-11). This paper describes the assessment approach being used in a Report to Congress currently being prepared by Oak Ridge National Laboratory. The 9505 assessment will examine climate change effects on water available for hydropower operations and the future power supplies marketed from federal hydropower projects. It will also include recommendations from the Power Marketing Administrations (PMAs) on potential changes in operation or contracting practices that could address these effects and risks of climate change. Potential adaption and mitigation strategies will also be identified. Federal hydropower comprises approximately half of the U.S. hydropower portfolio. The results from the 9505 assessment will promote better understanding among federal dam owners/operators of the sensitivity of their facilities to water availability, and it will provide a basis for planning future actions that will enable adaptation to climate variability and change. The end-users of information are Congressional members, their staff, the PMAs and their customers, federal dam owners/operators, and the DOE Water Power Program.

Sale, Michael J [ORNL; Kao, Shih-Chieh [ORNL; Uria Martinez, Rocio [ORNL; Wei, Yaxing [ORNL

2011-01-01T23:59:59.000Z

288

Mini-conference and Related Sessions on Laboratory Plasma Astrophysics  

SciTech Connect

This paper provides a summary of some major physics issues and future perspectives discussed in the Mini-Conference on Laboratory Plasma Astrophysics. This Mini-conference, sponsored by the Topical Group on Plasma Astrophysics, was held as part of the American Physical Society's Division of Plasma Physics 2003 Annual Meeting (October 27-31, 2003). Also included are brief summaries of selected talks on the same topic presented at two invited paper sessions (including a tutorial) and two contributed focus oral sessions, which were organized in coordination with the Mini-Conference by the same organizers.

Hantao Ji

2004-02-27T23:59:59.000Z

289

Woodruff Narrows low head hydroelectric power plant feasibility determination  

DOE Green Energy (OSTI)

Woodruff Narrows Reservoir, owned by the State of Utah, was built in 1961 as an irrigation reservoir. The reservoir outlet works and spillway are in need of repair, and plans have been made to enlarge the reservoir from its present capacity of 28,000 acre-feet to 53,200 acre-feet when these repairs are made. The purpose of this study was to determine if it is feasible to add hydropower facilities when the reservoir is repaired and enlarged. A computer simulation model based on mean monthly values, utilizing 26 years of recorded streamflow into the reservoir, was used to determine the mean annual energy potential for the following configurations: (1) present dam, (2) the proposed enlarged dam, (3) a new dam at the lower site with a maximum head of 65 feet, and (4) a new dam at the lower site which would store water to the same elevation as the proposed enlarged dam. Results of the simulation study show that maximum power capacities are respectively 2.1, 3.0, 3.9, and 4.5 megawatts. The marketing potential for this electric power, cost estimates and financial analysis, and environmental, social, and regulatory aspects of the proposed hydropower facilities were evaluated. The results showed the addition of hydroelectric power development at the Woodruff Narrows site would have minimal social and environmental effects on the area, would result in little or no changes in the present patterns of water and land use, income, population, and employment and would not result in any significant changes of the social structure or characteristics of the area. However, hydroelectric power development at the Woodruff Narrows site is not economically feasible at the present time. (LCL)

Not Available

1979-03-01T23:59:59.000Z

290

Feasibility analysis of geothermal district heating for Lakeview, Oregon  

DOE Green Energy (OSTI)

An analysis of the geothermal resource at Lakeview, Oregon, indicates that a substantial resource exists in the area capable of supporting extensive residential, commercial and industrial heat loads. Good resource productivity is expected with water temperatures of 200{degrees}F at depths of 600 to 3000 feet in the immediate vicinity of the town. Preliminary district heating system designs were developed for a Base Case serving 1170 homes, 119 commercial and municipal buildings, and a new alcohol fuel production facility; a second design was prepared for a downtown Mini-district case with 50 commercial users and the alcohol plant. Capital and operating costs were determined for both cases. Initial development of the Lakeview system has involved conducting user surveys, well tests, determinations of institutional requirements, system designs, and project feasibility analyses. A preferred approach for development will be to establish the downtown Mini-district and, as experience and acceptance are obtained, to expand the system to other areas of town. Projected energy costs for the Mini-district are $10.30 per million Btu while those for the larger Base Case design are $8.20 per million Btu. These costs are competitive with costs for existing sources of energy in the Lakeview area.

Not Available

1980-12-23T23:59:59.000Z

291

TVA Low Impact Hydro Feasibility Study: Phase 1 Technology and Site Assessment  

Science Conference Proceedings (OSTI)

As a result of the Tennessee Valley Authority (TVA)'s interest in further developing its green marketing program, it partnered with EPRI for guidance in a new study of TVA's hydropower resources. As a result of an EPRI solicitation of bids for TVA's "Low Impact Hydro Feasibility Study," Verdant Power, in its primary role as a systems integrator and site developer, was chosen to conduct the project. TVA's initial interest was to have surveyed 24 impoundment sites and several non-impoundment locations with...

2002-12-12T23:59:59.000Z

292

A Study on the Integrated MSW Management Technologies of Work Zone in the Hydropower Station of Yangtze Basin  

Science Conference Proceedings (OSTI)

As the hydropower exploitation of Yangtze basin in China is booming, thousands of workers work and live in the construction encampment, which results in more and more serious MSW pollution. In order to control environment pollution and protect the health ... Keywords: Municipal Solid Waste (MSW), Yangtze Basin, Integrated Waste Management, Pollution Control, Work Zone of Hydropower Station, Analytic Hierarchy Process (AHP)

Han Zhiyong; Liu Dan; Li Qibin; Xie Guangwu; Lang Jian; Zhang Luliang

2011-02-01T23:59:59.000Z

293

File:Federal Hydropower - Bureau of Indian Affairs.pdf | Open Energy  

Open Energy Info (EERE)

Federal Hydropower - Bureau of Indian Affairs.pdf Federal Hydropower - Bureau of Indian Affairs.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Bureau of Indian Affairs.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 685 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:25, 22 May 2013 Thumbnail for version as of 15:25, 22 May 2013 1,275 × 1,650, 2 pages (685 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

294

File:Federal Hydropower - Federal Energy Regulatory Commission.pdf | Open  

Open Energy Info (EERE)

Federal Hydropower - Federal Energy Regulatory Commission.pdf Federal Hydropower - Federal Energy Regulatory Commission.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Federal Energy Regulatory Commission.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 740 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:32, 22 May 2013 Thumbnail for version as of 15:32, 22 May 2013 1,275 × 1,650, 2 pages (740 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

295

Field Monitoring Protocol: Mini-Split Heat Pumps  

DOE Green Energy (OSTI)

The report provides a detailed method for accurately measuring and monitoring performance of a residential Mini-Split Heat Pump. It will be used in high-performance retrofit applications, and as part of DOE's Building America residential research program.

Christensen, D.; Fang, X.; Tomerlin, J.; Winkler, J.; Hancock, E.

2011-03-01T23:59:59.000Z

296

Neutral Current Elastic Interactions in MiniBooNE  

SciTech Connect

Neutral Current Elastic (NCE) interactions in MiniBooNE are discussed. In the neutrino mode MiniBooNE reported: the flux averaged NCE differential cross section as a function of four-momentum transferred squared, an axial mass (M{sub A}) measurement, and a measurement of the strange quark spin content of the nucleon, {Delta}s. In the antineutrino mode we present the background-subtracted data which is compared with the Monte Carlo predictions.

Dharmapalan, Ranjan; /Alabama U.

2011-10-01T23:59:59.000Z

297

Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

298

Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

299

Optimization of the Mini-Flo flow cytometer  

SciTech Connect

A new method of collecting light scattering from a liquid flow cytometer has been proposed; this apparatus is named the Mini-Flo flow cytometer. The Mini-Flo uses a high numerical aperture collection immersed in the flow stream. The collector consists of a conically tipped fiber optic pipe and terminating optical detector. This study was performed to improve the signal/noise ration and optimize the Mini-Flo`s performance for HIV blood detection applications. Experiments were performed to gauge the effects of Raman scattering, lens/filter fluorescence, and fiber optic fluorescence on the Mini-Flo`s performance and signal/noise ratio. Results indicated that the fiber optic was a major source of fluorescence noise and reducing its length from 33 cm to 10 cm increased the signal noise ratio from 8 to 75. Therefore, one of the key issues in optimizing the Mini-Flo`s performance is a redesign of the holding structure such that the fiber optic length is minimized. Further improvements of the Mini-Flo`s performance can be achieved by studying the polish of the fiber optic, the flow over the fiber optics`s conical tip, and the optimal particle rates.

Venkatesh, M.

1996-06-01T23:59:59.000Z

300

Feasibility study for Boardman River hydroelectric power. Final report  

DOE Green Energy (OSTI)

The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

None

1979-02-22T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

14-plex Feasibility Report  

SciTech Connect

The Native Village of Unalakleet project was a feasibility study for a retrofit of a tribally owned three story, 14 apartment complex located in Unalakleet, Alaska. The program objective and overall goal was to create a plan for retrofitting to include current appraised value and comparable costs of new construction to determine genuine feasibility as low-income multi-family housing for tribal members.

Kotongan, Victoria Hazel [Native Village of Unalakleet

2013-06-21T23:59:59.000Z

302

Geothermal energy: feasibility study  

DOE Green Energy (OSTI)

A research program initiated to investigate the feasibility of using the geothermal energy available in salt domes to generate electrical power and of using cavities developed in salt domes as high temperature, high pressure chemical reaction vessels for converting municipal wastes to fuel oil or gas is described. Power generation from geothermal was not found to be economically feasible. The conversion of waste to fuel is possible if the problems of cavity collapse can be avoided. (MHR)

Hodgson, E.W. Jr.; Ziegler, R.C.

1976-02-01T23:59:59.000Z

303

Parametric virtual laboratory development: A hydropower case study with student perspectives  

Science Conference Proceedings (OSTI)

In order to take advantage of trends such as genetic-design students need to be familiar, and comfortable, with the concept of parametric computer models and how their parameters relate to physical-forms. Virtual learning software can aid in creating ... Keywords: 3D modeling, Graphics, Hydropower, Parametric, Rotors, Virtual learning

Andrew M. Thomas, Venkatesh C. Vijay, Pathmeswaran Raju, Craig Chapman, Parmjit Chima, Alok Mathur, Adel Chemaly

2013-10-01T23:59:59.000Z

304

Physical Sediment Model Test in the Reservoir of Laomukong Hydropower Station in Minjiang River  

Science Conference Proceedings (OSTI)

A physical model is used to investigate the sediment transport in the reservoir of Lamukong hydropower station under design. The model test results are the main theoretical basis for the dyke line layout in the two sides of the reservoir. The test results ... Keywords: physical model, suspended sediment transport, reservoir dyke layout, reservoir operation mode

Yunli Wang; Xujin Zhang; Zhihui Ni

2012-05-01T23:59:59.000Z

305

Modelling and simulation of an autonomous variable speed micro hydropower station  

Science Conference Proceedings (OSTI)

In this paper, the modelling of an autonomous variable speed micro hydropower station is presented. It is composed of a doubly fed induction generator linked mechanically and electrically to a permanent magnet synchronous machine which may recover or ... Keywords: Distributed generation, Doubly fed induction machine, Micro hydroelectricity, Variable speed autonomous hydrogenerator

A. Ansel; B. Robyns

2006-06-01T23:59:59.000Z

306

Modelling and simulation of an autonomous variable speed micro hydropower station  

Science Conference Proceedings (OSTI)

In this paper, the modelling of an autonomous variable speed micro hydropower station is presented. It is composed of a doubly fed induction generator linked mechanically and electrically to a permanent magnet synchronous machine which may recover or ... Keywords: distributed generation, doubly fed induction machine, micro hydroelectricity, variable speed autonomous hydrogenerator

A. Ansel; B. Robyns

2006-06-01T23:59:59.000Z

307

Water Resource Management and Hydropower: Guidebook for Collaboration and Public Involvement  

Science Conference Proceedings (OSTI)

This Guidebook provides processes and tools to help hydropower operators develop improved communications and "early and often" involvement with stakeholders. These processes can help identify and activate public support for hydro and ultimately avoid unnecessary loss of hydro generation and other limitations on hydro during relicensing.

1996-12-12T23:59:59.000Z

308

On-line Fault Diagnosis Model of the Hydropower Units Based on MAS  

Science Conference Proceedings (OSTI)

The paper introduced a novel on-line fault diagnosis system model of the hydropower units based on multi-agent system. In allusion to the classical MAS-based fault diagnosis model, it proposes a new function of information interactive between the mission-controlled ...

Liao Jiaping; Fu Bo; Chen Yu

2009-07-01T23:59:59.000Z

309

Optimize Dispatchers of Cascade Hydropower Station Based on IS-NGA  

Science Conference Proceedings (OSTI)

Because the short-time optimized dispatcher question has some characteristics such as high dimension, non-protruding, dispersed, non-linear etc., so need one algorithm with high calculation precise and convergence speed to solve this question. This paper ... Keywords: optimize dispatcher, cascade hydropower station, self-adaptation, Niche genetic algorithm

Zhao Tinghong, Man Zibin, Wang Yu, Wang Zhijun

2013-01-01T23:59:59.000Z

310

Representing Energy Price Variability in Long-and Medium-term Hydropower Optimization  

E-Print Network (OSTI)

literature focuses on electricity markets modeling and electricity price forecasting (Nogales et al., 2002. Contreras, A. J. Conejo, and R. Espínola. (2002). "Forecasting next-day electricity prices by time series capacity increases, some hydropower plants can provide base load instead. The use of an average energy

Lund, Jay R.

311

Online Classified or Controlled Information Mini-Lessons | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Online Classified or Controlled Information Mini-Lessons Online Classified or Controlled Information Mini-Lessons Online Classified or Controlled Information Mini-Lessons These online lessons are short animated lessons to provide you with a quick refresher on some aspect of classified or controlled information. If there is a particular aspect of classified or controlled information you would like addressed in a lesson, please contact the Outreach Program at (301) 903-5767 or outreach@hq.doe.gov. Classified Information Marking Classified Documents: These lessons cover marking derivatively classified documents. Marking Documents Containing RD or FRD How to Fill out the Classification Authority Block when multiple sources are used (for documents containing RD or FRD) Marking Documents Containing NSI How to Fill out the Classification Authority Block when multiple

312

Mini Berlin powered by Vattenfall (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

Mini Berlin powered by Vattenfall (Smart Grid Project) Mini Berlin powered by Vattenfall (Smart Grid Project) Jump to: navigation, search Project Name Mini Berlin powered by Vattenfall Country Germany Headquarters Location Berlin, Germany Coordinates 52.523403°, 13.4114° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.523403,"lon":13.4114,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

313

The Role of the state in large-scale hydropower development perspectives from Chile, Ecuador, and Per  

E-Print Network (OSTI)

In recent years, governments in South America have turned to large-scale hydropower as a cost-effective way to improve livelihoods while addressing the energy 'trilemma': ensuring that future energy technologies provide ...

Zambrano-Barragn, Patricio Xavier

2012-01-01T23:59:59.000Z

314

Application of Advanced Particle Swarm Optimization Algorithm Based on SA in Multi-tiers Hydropower Stations Optimization  

Science Conference Proceedings (OSTI)

Optimal operation of multi-tiers hydropower stations is a kind of nonlinear optimization problem. An advanced PSO algorithm based on simulated annealing is put forward to promote the solution accuracy and to avoid falling into local optimal solutions ...

Kong Ke; Wang Shao-bo; Xie Jian-cang; Sun Fan

2009-08-01T23:59:59.000Z

315

Demonstration Development Project: Solicitation and Selection of a Site to Test a Fish-Friendly Hydropower Turbine  

Science Conference Proceedings (OSTI)

With an increasing demand for renewable energy throughout the world, the ability to produce power while minimizing environmental impacts has become a driving force in the continued development of hydropower. A new hydropower turbine that has the potential to contribute to power demands while minimally impacting fish populations is the Alden turbine, which was developed through the U.S. Department of Energy's (DOE's) former Advanced Hydro Turbine Systems Program and, more recently, Electric Power Research...

2011-01-03T23:59:59.000Z

316

Evaluation of Protected Metal Hydride Slurries in a H2 Mini-  

E-Print Network (OSTI)

Evaluation of Protected Metal Hydride Slurries in a H2 Mini- Grid TIAX, LLC Acorn Park Cambridge_MERIT_REVIEW_MAY2003 2 Introduction Hydrogen Mini-Grid Concept Distributed FCPS utilizing a H2 Mini-Grid can provide waste heat can be used for hot water or space heating in buildings (i.e. "cogen") Distributed FCPS

317

Report on a 2009 mini-demonstration of the ARG-US Radio Frequency Identification (RFID) system in transportation.  

SciTech Connect

The Packaging Certification Program (PCP) of the U.S. Department of Energy (DOE) Environmental Management (EM), Office of Packaging and Transportation (EM-14), has developed a radio frequency identification (RFID) tracking and monitoring system for the management of nuclear materials during storage and transportation. The system, developed by the PCP team at Argonne National Laboratory, consists of hardware (Mk-series sensor tags, fixed and handheld readers, form factor for multiple drum types, seal integrity sensors, and enhanced battery management), software (application programming interface, ARG-US software for local and remote/web applications, secure server and database management), and cellular/satellite communication interfaces for vehicle tracking and item monitoring during transport. The ability of the above system to provide accurate, real-time tracking and monitoring of the status of multiple, certified containers of nuclear materials has been successfully demonstrated in a week-long, 1,700-mile DEMO performed in April 2008. While the feedback from the approximately fifty (50) stakeholders who participated in and/or observed the DEMO progression were very positive and encouraging, two major areas of further improvements - system integration and web application enhancement - were identified in the post-DEMO evaluation. The principal purpose of the MiniDemo described in this report was to verify these two specific improvements. The MiniDemo was conducted on August 28, 2009. In terms of system integration, a hybrid communication interface - combining the RFID item-monitoring features and a commercial vehicle tracking system by Qualcomm - was developed and implemented. In the MiniDemo, the new integrated system worked well in reporting tag status and vehicle location accurately and promptly. There was no incompatibility of components. The robust commercial communication gear, as expected, helped improve system reliability. The MiniDemo confirmed that system integration is technically feasible and reliable with the existing RFID and Qualcomm satellite equipment. In terms of web application, improvements in mapping, tracking, data presentation, and post-incident spatial query reporting were implemented in ARG-US, the application software that manages the dataflow among the RFID tags, readers, and servers. These features were tested in the MiniDemo and found to be satisfactory. The resulting web application is both informative and user-friendly. A joint developmental project is being planned between the PCP and the DOE TRANSCOM that uses the Qualcomm gear in vehicles for tracking and communication of radioactive material shipments across the country. Adding an RFID interface to TRANSCOM is a significant enhancement to the DOE infrastructure for tracking and monitoring shipments of radioactive materials.

Tsai, H.; Chen, K.; Jusko, M.; Craig, B.; Liu, Y.; Decision and Information Sciences

2009-11-23T23:59:59.000Z

318

Microgrid Feasibility Study Report  

Science Conference Proceedings (OSTI)

Many electricity customers in rural areas in the northeastern part of the United States have been experiencing power outages lasting ten hours and longer, which far exceeds the Customer Average Interruption Duration Index target of approximately two hours.One possible solution would be to operate these remote communities as a microgrid when the power supply line is out of service. The utility contracted with the Electric Power Research Institute (EPRI) to conduct a feasibility study to ...

2013-12-19T23:59:59.000Z

319

Ductless Mini-Split Heat Pump Comfort Evaluation  

SciTech Connect

Field tests were conducted in two homes in Austin, TX to evaluate the comfort performance of ductless mini-split heat pumps (DMSHPs), measuring temperature and relative humidity measurements in four rooms in each home before and after retrofitting a central HVAC system with DMSHPs.

Roth, K.; Sehgal, N.; Akers, C.

2013-03-01T23:59:59.000Z

320

Poster: mini-applications: vehicles for co-design  

Science Conference Proceedings (OSTI)

Application performance is determined by a combination of many choices: hardware plat-form, runtime environment, languages and compilers used, algorithm choice and implementation, and more. In this complicated environment, we find that the use of mini-applications ... Keywords: computer architectures, performance prediction

Richard F. Barrett; Michael A. Heroux; Paul T. Lin; Courtenay T. Vaughan; Alan B. Williams

2011-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Stanford Green Dorm Project --Photovoltaic Mini-Report --  

E-Print Network (OSTI)

, and promotional purposes. Technology Overview Photovoltaic (PV) cells are semiconductor devices that convert light and the overall installation of modules is called an array. Diagram of photovoltaic cell. (httpStanford Green Dorm Project -- Photovoltaic Mini-Report -- Paul Kreiner ­ May 7, 2004 Purpose PVs

Krothapalli, Anjaneyulu

322

Study on Reactive Power and Voltage Control of Power Grid with Small Hydropower  

Science Conference Proceedings (OSTI)

When it is in the wet season and the load is low, reactive power surplus and voltage rise are caused by high-efficiency power generation of small hydropower and load reduction in Linjiang region, Baishan city, JiLin province. These problems, which exist ... Keywords: small hydro power, vally load, reactive power balance, the rise in voltage, generator in leading power factor on operation

Yaopeng Bai; Lijie Xu; Wei Wang

2010-06-01T23:59:59.000Z

323

Greenhouse Gas Emissions from U.S. Hydropower Reservoirs: FY2011 Annual Progress Report  

Science Conference Proceedings (OSTI)

The primary objective of this study is to quantify the net emissions of key greenhouse gases (GHG) - notably, CO{sub 2} and CH{sub 4} - from hydropower reservoirs in moist temperate areas within the U.S. The rationale for this objective is straightforward: if net emissions of GHG can be determined, it would be possible to directly compare hydropower to other power-producing methods on a carbon-emissions basis. Studies of GHG emissions from hydropower reservoirs elsewhere suggest that net emissions can be moderately high in tropical areas. In such areas, warm temperatures and relatively high supply rates of labile organic matter can encourage high rates of decomposition, which (depending upon local conditions) can result in elevated releases of CO{sub 2} and CH{sub 4}. CO{sub 2} and CH{sub 4} emissions also tend to be higher for younger reservoirs than for older reservoirs, because vegetation and labile soil organic matter that is inundated when a reservoir is created can continue to decompose for several years (Galy-Lacaux et al. 1997, Barros et al. 2011). Water bodies located in climatically cooler areas, such as in boreal forests, could be expected to have lower net emissions of CO{sub 2} and CH{sub 4} because their organic carbon supplies tend to be relatively recalcitrant to microbial action and because cooler water temperatures are less conducive to decomposition.

Stewart, Arthur J [ORNL; Mosher, Jennifer J [ORNL; Mulholland, Patrick J [ORNL; Fortner, Allison M [ORNL; Phillips, Jana Randolph [ORNL; Bevelhimer, Mark S [ORNL

2012-05-01T23:59:59.000Z

324

Prediction of Total Dissolved Gas (TDG) at Hydropower Dams throughout the Columbia  

DOE Green Energy (OSTI)

The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. The entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin cause elevated levels of total dissolved gas (TDG) saturation. Physical processes that affect TDG exchange at hydropower facilities have been characterized throughout the CRB in site-specific studies and at real-time water quality monitoring stations. These data have been used to develop predictive models of TDG exchange which are site specific and account for the fate of spillway and powerhouse flows in the tailrace channel and resultant transport and exchange in route to the downstream dam. Currently, there exists a need to summarize the findings from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow for the formulation of optimal water regulation schedules subject to water quality constraints for TDG supersaturation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases.

Pasha, MD Fayzul K [ORNL; Hadjerioua, Boualem [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

2012-01-01T23:59:59.000Z

325

MiniBooNE "Windows on the Universe"  

Science Conference Proceedings (OSTI)

Progress in the last few decades has left neutrino physics with several vexing issues. Among them are the following questions: (1) Why are lepton mixing angles so different from those in the quark sector? (2) What is the most probable range of the reactor mixing angle? (3) Is the atmospheric mixing angle maximal? (4) What is the number of fermion generations? These are some of the issues that neutrino science hopes to study; this article will explore these questions as part of a more general scientific landscape, and will discuss the part MiniBooNE might play in this exploration. We discuss the current state of measurements taken by MiniBooNE, and emphasize the uniqueness of neutrino oscillations as an important probe into the 'Windows on the Universe.'

Stefanski, Ray; /Fermilab

2010-12-09T23:59:59.000Z

326

Neutrino and Antineutrino Cross sections at MiniBooNE  

SciTech Connect

The MiniBooNE experiment has reported a number of high statistics neutrino and anti-neutrino cross sections -among which are the charged current quasi-elastic (CCQE) and neutral current elastic (NCE) neutrino scattering on mineral oil (CH2). Recently a study of the neutrino contamination of the anti-neutrino beam has concluded and the analysis of the anti-neutrino CCQE and NCE scattering is ongoing.

Dharmapalan, Ranjan; /Alabama U.

2011-10-01T23:59:59.000Z

327

Sustainable development of hydropower in third countries: The development of hydropower on a sustainable basis has been an array of humanitarian and economic development, especially for local people as well as an important tool in the fight against glo  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT SHEET: SUSTAINABLE DEVELOPMENT OF HYDROPOWER INITIATIVE At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers pledged to establish the Sustainable Development of Hydropower Initiative to promote the sustainable use of hydropower in developing countries in regions such as Africa, Asia, and Central America, and to identify potential financial resources from multilateral organizations to advance such projects.

328

Capturing the Green River -- Multispectral airborne videography to evaluate the environmental impacts of hydropower operations  

DOE Green Energy (OSTI)

The 500-mile long Green River is the largest tributary of the Colorado River. From its origin in the Wind River Range mountains of western Wyoming to its confluence with the Colorado River in southeastern Utah, the Green River is vital to the arid region through which it flows. Large portions of the area remain near-wilderness with the river providing a source of recreation in the form of fishing and rafting, irrigation for farming and ranching, and hydroelectric power. In the late 1950`s and early 1960`s hydroelectric facilities were built on the river. One of these, Flaming Gorge Dam, is located just south of the Utah-Wyoming border near the town of Dutch John, Utah. Hydropower operations result in hourly and daily fluctuations in the releases of water from the dam that alter the natural stream flow below the dam and affect natural resources in and along the river corridor. In the present study, the authors were interested in evaluating the potential impacts of hydropower operations at Flaming Gorge Dam on the downstream natural resources. Considering the size of the area affected by the daily pattern of water release at the dam as well as the difficult terrain and limited accessibility of many reaches of the river, evaluating these impacts using standard field study methods was virtually impossible. Instead an approach was developed that used multispectral aerial videography to determine changes in the affected parameters at different flows, hydrologic modeling to predict flow conditions for various hydropower operating scenarios, and ecological information on the biological resources of concern to assign impacts.

Snider, M.A.; Hayse, J.W.; Hlohowskyj, I.; LaGory, K.E.

1996-02-01T23:59:59.000Z

329

Solar Mini-Dimming Kinematics and Their Positive Correlations with Coronal Mass Ejections and Prominence  

E-Print Network (OSTI)

Solar mini-dimmings can be detect in the Extreme Ultra-Violet coro- nal eruptions. Here, sequences of 171 A images taken by Solar Dynamic Observa- tory/Atmospheric Imaging Assembaly on 13 June 2010 are used. In this special day, both of coronal mass ejection and prominence were observed. The average velocities and accelerations of 500 mini-dimmings which were detected using on feature based classifier (Alipour et al 2012) are studied. The large number of mini-dimmings shows positive accelerations in the beginning times as similar as Coronal Mass Ejections. On the the start time of prominence eruptions, the number of mini-dimmings is increased to a maximum values. There is a positive correlation between the kinematics of mini- dimmings and both CME and prominences. This study can be extended to understand the exact relationship of CMEs and mini-dimmings.

Alipour, Nasibe

2013-01-01T23:59:59.000Z

330

Tribal Utility Feasibility Study  

SciTech Connect

The Schatz Energy Research Center (SERC) assisted the Yurok Tribe in investigating the feasibility of creating a permanent energy services program for the Tribe. The original purpose of the DOE grant that funded this project was to determine the feasibility of creating a full-blown Yurok Tribal electric utility to buy and sell electric power and own and maintain all electric power infrastructure on the Reservation. The original project consultant found this opportunity to be infeasible for the Tribe. When SERC took over as project consultant, we took a different approach. We explored opportunities for the Tribe to develop its own renewable energy resources for use on the Reservation and/or off-Reservation sales as a means of generating revenue for the Tribe. We also looked at ways the Tribe can provide energy services to its members and how to fund such efforts. We identified opportunities for the development of renewable energy resources and energy services on the Yurok Reservation that fall into five basic categories: Demand-side management This refers to efforts to reduce energy use through energy efficiency and conservation measures. Off-grid, facility and household scale renewable energy systems These systems can provide electricity to individual homes and Tribal facilities in areas of the Reservation that do not currently have access to the electric utility grid. Village scale, micro-grid renewable energy systems - These are larger scale systems that can provide electricity to interconnected groups of homes and Tribal facilities in areas of the Reservation that do not have access to the conventional electric grid. This will require the development of miniature electric grids to serve these interconnected facilities. Medium to large scale renewable energy development for sale to the grid In areas where viable renewable energy resources exist and there is access to the conventional electric utility grid, these resources can be developed and sold to the wholesale electricity market. Facility scale, net metered renewable energy systems These are renewable energy systems that provide power to individual households or facilities that are connected to conventional electric utility grid.

Engel, R. A.; Zoellick, J. J.

2007-06-30T23:59:59.000Z

331

Hydropower Technology Roundup Report: Directions for Hydro Research and Development (TR-113584-V6)  

Science Conference Proceedings (OSTI)

The 2001 Hydro R&D Forum, held July 12-13, 2001 in Salt Lake City, Utah, provided a special opportunity for examining future prospects for EPRI's hydro-related research and development. EPRI was a key supporter of the Forum. This report is being produced as a special report within EPRI's Hydropower Technology Roundup Program series -- the sixth Tech Roundup report. It was developed based on the results of the Forum and, with the guidance of an advisory panel, has been tailored to the interests and needs ...

2002-03-22T23:59:59.000Z

332

EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines: Technical Papers  

Science Conference Proceedings (OSTI)

This report presents the proceedings of a conference held to discuss developments in the field of environmentally friendly hydroturbines. The Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE), in cooperation with the U.S. Army Corps of Engineers (USACE), the U.S. Bureau of Reclamation (USBR), and the National Hydropower Association (NHA), conducted the conference May 1920, 2011, in Washington, D.C., to disseminate information on the state of the art in environmentally enha...

2011-12-07T23:59:59.000Z

333

Mini RF-driven ion source for focused ion beam system  

DOE Green Energy (OSTI)

Mini RF-driven ion sources with 1.2 cm and 1.5 cm inner chamber diameter have been developed at Lawrence Berkeley National Laboratory. Several gas species have been tested including argon, krypton and hydrogen. These mini ion sources operate in inductively coupled mode and are capable of generating high current density ion beams at tens of watts. Since the plasma potential is relatively low in the plasma chamber, these mini ion sources can function reliably without any perceptible sputtering damage. The mini RF-driven ion sources will be combined with electrostatic focusing columns, and are capable of producing nano focused ion beams for micro machining and semiconductor fabrications.

Jiang, X.; Ji, Q.; Chang, A.; Leung, K.N.

2002-08-02T23:59:59.000Z

334

Technical and Economic Assessment of Off-grid, Mini-grid and...  

Open Energy Info (EERE)

Technical and Economic Assessment of Off-grid, Mini-grid and Grid Electrification Technologies Jump to: navigation, search Name Technical and Economic Assessment of Off-grid,...

335

Mini-Proceedings ECT*: Speakable in quantum mechanics: atomic, nuclear and subnuclear physics tests  

E-Print Network (OSTI)

Mini-Proceedings ECT*: Speakable in quantum mechanics: atomic, nuclear and subnuclear physics tests, ECT*-Trento, 29 August - 2 September, 2011

Curceanu, C; Milotti, E

2011-01-01T23:59:59.000Z

336

Mini-Proceedings ECT*: Speakable in quantum mechanics: atomic, nuclear and subnuclear physics tests  

E-Print Network (OSTI)

Mini-Proceedings ECT*: Speakable in quantum mechanics: atomic, nuclear and subnuclear physics tests, ECT*-Trento, 29 August - 2 September, 2011

C. Curceanu; J. Marton; E. Milotti

2011-12-06T23:59:59.000Z

337

A progress report on DOE`s advanced hydropower turbine systems program  

DOE Green Energy (OSTI)

Recent hydropower research within the U.S. Department of Energy (DOE) has focused on the development of new turbine designs that can produce hydroelectricity without such adverse environmental affects as fish entrainment/impingement or degradation of water quality. In partnership with the hydropower industry, DOE`s advanced turbine program issued a Request for Proposals for conceptual designs in October 1994. Two contracts were awarded for this initial program phase, work on which will be complete this year. A technical advisory committee with representatives from industry, regulatory agencies, and natural resource agencies was also formed to guide the DOE turbine research. The lack of quantitative biological performance criteria was identified by the committee as a critical knowledge gap. To fill this need, a new literature review was completed on the mechanisms of fish mortality during turbine passage (e.g., scrape/strike, shear, press change, etc.), ways that fish behavior affects their location and orientation in turbines, and how these turbine passage stresses can be measured. Thus year, new Laboratory tests will be conducted on fish response to shear, the least-well understood mechanism of stress. Additional testing of conceptual turbine designs depends on the level of federal funding for this program.

Sale, M.J.; Cada, G.F.; Rinehart, B.E. [and others

1997-06-01T23:59:59.000Z

338

Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado  

DOE Green Energy (OSTI)

This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios.

Yin, S.C.L. [Argonne National Lab., IL (United States). Environmental Assessment Div.; McCoy, J.J. [Western Area Power Administration, Salt Lake City, UT (United States); Sedlacek, J. [PLM Technologies, Evergreen, CO (United States)

1995-05-01T23:59:59.000Z

339

Application of immune algorithm-based particle swarm optimization for optimized load distribution among cascade hydropower stations  

Science Conference Proceedings (OSTI)

The immune algorithm-based particle swarm optimization (IA-PSO), which is proposed by involving the immune information processing mechanism into the original particle swarm optimal algorithm, improves the ability to find the globally excellent result ... Keywords: Cascade hydropower stations, Immune algorithm, Load distribution, PSO

Anqiang Li; Liping Wang; Jiqing Li; Changming Ji

2009-06-01T23:59:59.000Z

340

MiniMAX: A Compact, Portable X-Ray System For Field Inspection  

NLE Websites -- All DOE Office Websites (Extended Search)

MiniMAX: A Compact, Portable X-Ray System For Field Inspection MiniMAX: A Compact, Portable X-Ray System For Field Inspection MiniMAX: A Compact, Portable X-Ray System For Field Inspection MiniMAX takes x-ray images that are as detailed or even better than conventional hospital systems. However, unlike such systems, MiniMAX is easy to use, portable, lightweight, and inexpensive. MiniMAX takes advantage of the form factor of x-ray film, the physics of computed radiography (CR), and the compact technology of digital radiography (DR) panels to implement the benefits of each in a very simple, reliable, and compact system. July 11, 2013 Complete , 6.5lb, MiniMAX portable radiography system including Leica M9 camera, Jenoptik lens, JDSU dichroic filter, LED flash, CsBr storage phosphor, and 57-Co source. Complete, 6.5lb, MiniMAX portable radiography system including Leica M9

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Flathead Renewable Energy Feasibility Study  

DOE Green Energy (OSTI)

The study shall assess the feasibility of a commercial wind facility on lands selected and owned by the Salish and Kootenai Tribes and shall examine the potential for the development of solar and biomass resources located on Tribal Lands.

Belvin Pete: Ed McCarthy; Krista Gordon; Chris Bergen; Rhett Good

2006-10-03T23:59:59.000Z

342

File:Federal Hydropower - U.S. Geological Survey.pdf | Open Energy  

Open Energy Info (EERE)

Survey.pdf Survey.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - U.S. Geological Survey.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 794 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:41, 22 May 2013 Thumbnail for version as of 15:41, 22 May 2013 1,275 × 1,650, 2 pages (794 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file:

343

File:Federal Hydropower - Western Area Power Administration.pdf | Open  

Open Energy Info (EERE)

Western Area Power Administration.pdf Western Area Power Administration.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Western Area Power Administration.pdf Size of this preview: 466 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,305 × 1,680 pixels, file size: 715 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:42, 22 May 2013 Thumbnail for version as of 15:42, 22 May 2013 1,305 × 1,680, 2 pages (715 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file:

344

Microsoft PowerPoint - Hydropower conf SDOX June 2008 final [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

Supersaturated Dissolved Oxygen (SDOX(tm)) Supersaturated Dissolved Oxygen (SDOX(tm)) Delivery Technology at Norfork Dam Delivery Technology at Norfork Dam Scott Osborn Chief Technology Officer Scott Osborn, Chief Technology Officer Clay Thompson, Senior Engineer Southwestern Federal Hydropower Conference June 12, 2008 BlueInGreen, LLC 535 W. Research Blvd. Fayetteville, AR 72701 (479) 527 6378 , (479) 527-6378 Background Background  Thanks to Marshall Boyken, Southwestern Power Administration Tulsa for inviting us and setting this up Administration, Tulsa for inviting us and setting this up.  The original presentation is from a meeting concerning low DO at Norfork Dam in Arkansas and how BlueInGreen's technology can address this problem.  Norfork River (tailrace) is 303(d) listed for low DO, feeds Norfork National

345

Analysis of potential impacts of Flaming Gorge Dam hydropower operations on archaeological sites  

DOE Green Energy (OSTI)

An archaeological field study was conducted along the Green River in the areas of Little Hole and Browns Park in Utah and Colorado. The purpose of the study was to measure the potential for hydropower operations at Flaming Gorge Dam to directly or indirectly affect archaeological sites in the study area. Thirty-four known sites were relocated, and six new sites were recorded. Information was collected at each site regarding location, description, geomorphic setting, sedimentary context, vegetation, slope, distance from river, elevation above river level, and site condition. Matching the hydrologic projections of river level and sediment load with the geomorphic and sedimentary context at specific site locations indicated that eight sites were in areas with a high potential for erosion.

Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.

1955-12-01T23:59:59.000Z

346

UCSD Biomass to Power Economic Feasibility Study  

E-Print Network (OSTI)

Biofuels,LLC UCSDBiomasstoPower EconomicFeasibilityFigure1:WestBiofuelsBiomassGasificationtoPowerrates... 31 UCSDBiomasstoPower?Feasibility

Cattolica, Robert

2009-01-01T23:59:59.000Z

347

Fish Passage Assessment of an Advanced Hydropower Turbine and Conventional Turbine Using Blade-strike Modeling  

Science Conference Proceedings (OSTI)

In the Columbia and Snake River basins, several species of Pacific salmon were listed under the Endangered Species Act of 1973 due to significant declines of fish population. Dam operators and design engineers are thus faced with the task of making those hydroelectric facilities more ecologically friendly through changes in hydro-turbine design and operation. Public Utility District No. 2 of Grant County, Washington, applied for re-licensing from the U.S. Federal Energy Regulatory Commission to replace the 10 turbines at Wanapum Dam with advanced hydropower turbines that were designed to increase power generation and improve fish passage conditions. We applied both deterministic and stochastic blade-strike models to the newly installed turbine and an existing turbine. Modeled probabilities were compared to the results of a large-scale live fish survival study and a sensor fish study under the same operational parameters. Overall, injury rates predicted by the deterministic model were higher than experimental rates of injury while those predicted by the stochastic model were in close agreement with experiment results. Fish orientation at the time of entry into the plane of the leading edges of the turbine runner blades was an important factor contributing to uncertainty in modeled results. The advanced design turbine had slightly higher modeled injury rates than the existing turbine design; however, there was no statistical evidence that suggested significant differences in blade-strike injuries between the two turbines and the hypothesis that direct fish survival rate through the advanced hydropower turbine is equal or better than that through the conventional turbine could not be rejected.

Deng, Zhiqun; Carlson, Thomas J.; Dauble, Dennis D.; Ploskey, Gene R.

2011-01-04T23:59:59.000Z

348

New Small Hydropower Technology to be Deployed in the United States  

SciTech Connect

Earth By Design Inc, (EBD), in collaboration with Oak Ridge National Laboratory (ORNL), Knight Pi sold and Co., and CleanPower AS, has responded to a Funding Opportunity Announcement (FOA) published by the Department of Energy (DOE) in April 2011. EBD submitted a proposal to install an innovative, small hydropower technology, the Turbinator, a Norwegian technology from CleanPower. The Turbinator combines an axial flow, fixed-blade Kaplan turbine and generator in a compact and sealed machine. This makes it a very simple and easy technology to be deployed and installed. DOE has awarded funding for this two-year project that will be implemented in Culver, Oregon. ORNL with the collaboration of CleanPower, will assess and evaluate the technology before and during the manufacturing phase and produce a full report to DOE. The goal of this phase-one report is to provide DOE Head Quarters (HQ), water power program management, a report with findings about the performance, readiness, capability, strengths and weakness, limitation of the technology, and potential full-scale deployment and application in the United States. Because of the importance of this information to the conventional hydropower industry and regulators, preliminary results will rapidly be distributed in the form of conference presentations, ORNL/DOE technical reports (publically available online, and publications in the peer-reviewed, scientific literature. These reports will emphasize the relevance of the activities carried out over the two-year study (i.e., performance, robustness, capabilities, reliability, and cost of the Turbinator). A final report will be submitted to a peer-reviewed publication that conveys the experimental findings and discusses their implications for the Turbinator application and implementation. Phase-two of the project consists of deployment, construction, and project operations. A detailed report on assessment and the performance of the project will be presented and communicated to DOE and published by ORNL.

Hadjerioua, Boualem [ORNL; Opsahl, Egil [CleanPower AS; Gordon, Jim [Earth By Design Inc., EBD; Bishop, Norm [Knigth Piesold Co.

2012-01-01T23:59:59.000Z

349

2009 BMW MINI EVAmerica fact sheet.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

3230 lb 3230 lb Delivered Curb Weight: 3306 lb Distribution F/R: 51/49 % GVWR: 3660 lb Payload 2 : 354 lb Performance Goal: 400 lb DIMENSIONS Wheelbase: 97.1 inches Track F/R: 57.4/57.8 inches Length: 145.6 inches Width: 66.3 inches Height: 55.4 inches Ground Clearance: 6.0 inches Performance Goal: 5.0 inches CHARGER Level 1: Location: On-board Type: Conductive Input Voltages: 120VAC Level 2: Location: Off-board Type: Conductive Input Voltages: 240 VAC © 2009 Electric Transportation Applications All Rights Reserved BASE VEHICLE: 2009 BMW MINI E Seatbelt Positions: Two Standard Features: Front Wheel Drive Front Disc and Rear Disc Brakes Regenerative Braking With Coast Down Three-Point Safety Belts Speedometer Odometer State-Of-Charge Meter BATTERY Type: Lithium Ion Number of Modules: 48

350

Hydrogen Production from Carbohydrates: A Mini-Review  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Hydrogen Production from Carbohydrates: A Mini-Review Y.-H. Percival Zhang *,1,2,3 1 Department of Biological Systems Engineering, Virginia Tech, 210-A Seitz Hall, Blacksburg, VA 24061, USA 2 Institute for Critical Technology and Applied Science (ICTAS), Virginia Tech, Blacksburg, VA 24061, USA 3 DOE BioEnergy Science Center (BESC), Oak Ridge, TN 37831, USA * Tel: 540-231-7414. Fax: 540-231-7414. Email: ypzhang@vt.edu. The hydrogen economy promises a clean energy future featuring higher energy utilization ef ciency and fewer pollutants compared to liquid fuel/internal combustion engines. Hydrogen production from the enriched low-cost biomass carbohydrates would achieve nearly zero carbon emissions in a whole life cycle. In this book chapter, we present latest advances of hydrogen generation from biomass carbohydrates by chemical catalysis (e.g., gasi cation,

351

Charged-Current Interaction Measurements in MiniBooNE  

SciTech Connect

Neutrino oscillation is the only known phenomenon for physics beyond the standard model. To investigate this phenomenon, the understanding of low energy neutrino scattering (200MiniBooNE finds that a simple Fermi gas model, with appropriate adjustments, accurately characterizes the CCQE events on carbon. The extracted parameters include an effective axial mass, MA=1.23 {+-} 0.20 GeV, and a Pauli-blocking parameter, kappa = 1.019 {+-} 0.011.

Katori, Teppei; /Indiana U.

2007-09-01T23:59:59.000Z

352

Trkalian fields: ray transforms and mini-twistors  

E-Print Network (OSTI)

We study X-ray and Divergent beam transforms of Trkalian fields and their relation with Radon transform. We make use of four basic mathematical methods of tomography due to Grangeat, Smith, Tuy and Gelfand-Goncharov for an integral geometric view on them. We also make use of direct approaches which provide a faster but restricted view of the geometry of these transforms. These reduce to well known geometric integral transforms on a sphere of the Radon or the spherical Curl transform in Moses eigenbasis, which are members of an analytic family of integral operators. We also discuss their inversion. The X-ray (also Divergent beam) transform of a Trkalian field is Trkalian. Also the Trkalian subclass of X-ray transforms yields Trkalian fields in the physical space. The Riesz potential of a Trkalian field is proportional to the field. Hence, the spherical mean of the X-ray (also Divergent beam) transform of a Trkalian field over all lines passing through a point yields the field at this point. The pivotal point is the simplification of an intricate quantity: Hilbert transform of the derivative of Radon transform for a Trkalian field in the Moses basis. We also define the X-ray transform of the Riesz potential (of order 2) and Biot-Savart integrals. Then, we discuss a mini-twistor respresentation, presenting a mini-twistor solution for the Trkalian fields equation. This is based on a time-harmonic reduction of wave equation to Helmholtz equation. A Trkalian field is given in terms of a null vector in C3 with an arbitrary function and an exponential factor resulting from this reduction.

K. Saygili

2013-12-14T23:59:59.000Z

353

Lower Sioux Wind Feasibility & Development  

SciTech Connect

This report describes the process and findings of a Wind Energy Feasibility Study (Study) conducted by the Lower Sioux Indian Community (Community). The Community is evaluating the development of a wind energy project located on tribal land. The project scope was to analyze the critical issues in determining advantages and disadvantages of wind development within the Community. This analysis addresses both of the Community's wind energy development objectives: the single turbine project and the Commerical-scale multiple turbine project. The main tasks of the feasibility study are: land use and contraint analysis; wind resource evaluation; utility interconnection analysis; and project structure and economics.

Minkel, Darin

2012-04-01T23:59:59.000Z

354

Normanskill Hydroelectric Facility Feasibility Assessment  

DOE Green Energy (OSTI)

A study was conducted to determine the feasibility of installing a hydroelectric generating facility at an existing dam of the Normanskill Reservoir in NY. Evaluation of the hydrologic, technical, economic, legal, instrumental and environmental factors led to the conclusion that the project is feasible and advantageous. The proposed project has a present worth net cost of $3,099,800. The benefit cost ratio is 2.36. It is estimated that the proposed hydroelectric generating facility at the French's Mills site, City of Watervliet Reservoir will replace approximately 6,000 barrels of foreign oil per year. (LCL)

Besha, J.A.

1979-01-01T23:59:59.000Z

355

Magma energy: a feasible alternative  

DOE Green Energy (OSTI)

A program to investigate the scientific feasibility of extracting energy directly from deeply buried circulating magma sources is described. The following program tasks are discussed: source location and definition, source tapping, magma characterization, magma/material compatibility, and energy extraction. (MHR)

Colp, J.L.

1979-01-01T23:59:59.000Z

356

Research on Eco-Hydraulic Principles for Fish Passage and Protection: Fish Guidance at Buchanan Hydropower Plant, 2002  

Science Conference Proceedings (OSTI)

This study investigated the responses of downstream-migrating steelhead smolts to hydraulic patterns in a hydropower plant intake canal in April and May 2002. We used existing structures and hydraulic features, as well as an experimental baffle panel (in several configurations), to test the hypothesis that migrating smolts use hydraulic features, especially turbulent flow, to guide their downstream trajectories. Knowledge of the factors that orient smolts should allow design of passage routes that avoid ...

2003-04-10T23:59:59.000Z

357

EMTAs Evaluation of the Elastic Properties for Fiber Polymer Composites Potentially Used in Hydropower Systems  

Science Conference Proceedings (OSTI)

Fiber-reinforced polymer composites can offer important advantages over metals where lightweight, cost-effective manufacturing and high mechanical performance can be achieved. To date, these materials have not been used in hydropower systems. In view of the possibility to tailor their mechanical properties to specific applications, they now have become a subject of research for potential use in hydropower systems. The first step in any structural design that uses composite materials consists of evaluating the basic composite mechanical properties as a function of the as-formed composite microstructure. These basic properties are the elastic stiffness, stress-strain response, and strength. This report describes the evaluation of the elastic stiffness for a series of common discontinuous fiber polymer composites processed by injection molding and compression molding in order to preliminarily estimate whether these composites could be used in hydropower systems for load-carrying components such as turbine blades. To this end, the EMTA (Copyright Battelle 2010) predictive modeling tool developed at the Pacific Northwest National Laboratory (PNNL) has been applied to predict the elastic properties of these composites as a function of three key microstructural parameters: fiber volume fraction, fiber orientation distribution, and fiber length distribution. These parameters strongly control the composite mechanical performance and can be tailored to achieve property enhancement. EMTA uses the standard and enhanced Mori-Tanaka type models combined with the Eshelby equivalent inclusion method to predict the thermoelastic properties of the composite based on its microstructure.

Nguyen, Ba Nghiep; Paquette, Joshua

2010-08-01T23:59:59.000Z

358

Effects of Flaming Gorge Dam hydropower operations on flow and stage in the Green River, Utah and Colorado  

DOE Green Energy (OSTI)

This report presents the development of Flaming Gorge Reservoir release patterns and resulting downstream flows and stages for four potential hydropower operational scenarios. The release patterns were developed for three representative hydrologic years: moderate, dry, and wet. Computer models were used to estimate flows and stages in the Green River resulting from these release patterns for the moderate water year. The four hydropower operational scenarios for Flaming Gorge Dam were year-round high fluctuating flows, seasonally adjusted high fluctuating flows, seasonally adjusted moderate fluctuating flows, and seasonally adjusted steady flows. The year-round high fluctuating flow scenario assumes that the monthly total reservoir releases would be the same as historical releases. The remaining seasonally adjusted flow scenarios would comply with the 1992 Biological Opinion of the US Fish and Wildlife Service, which requires high flows in the spring and limited hourly fluctuations, especially in summer and autumn releases, to protect endangered fish. Within one year, the maximum daily river stage fluctuations resulting from hydropower operations under the seasonally adjusted high fluctuating flow scenario would be similar to the maximum daily fluctuations under the year-round high fluctuating flow scenario. However, reduced or no fluctuations would occur in some time periods under the former scenario. The maximum daily river stage fluctuations under the seasonally adjusted moderate fluctuating flow scenario would be about half of those under the seasonally adjusted high fluctuating flow scenario.

Yin, S.C.L.; Cho, H.E. [Argonne National Lab., IL (United States). Environmental Assessment Div.; McCoy, J.J.; Palmer, S.C. [Western Area Power Administration, Salt Lake City, UT (United States)

1995-05-01T23:59:59.000Z

359

EA-1642: Design and Construction of an Early Lead Mini Fischer-Tropsch  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42: Design and Construction of an Early Lead Mini 42: Design and Construction of an Early Lead Mini Fischer-Tropsch Refinery at the University of Kentucky Center for Applied Energy Research Near Lexington, Kentucky EA-1642: Design and Construction of an Early Lead Mini Fischer-Tropsch Refinery at the University of Kentucky Center for Applied Energy Research Near Lexington, Kentucky SUMMARY DOE's National Energy Technology Laboratory prepared this environmental assessment to analyze the potential environmental impacts of providing funding for the proposed Early Lead Mini Fischer-Tropsch Refinery. The early lead facility would be located at the University of Kentucky Center for Applied Energy Research in Fayette County Kentucky. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD

360

Mini-Grid Renewable Energy Systems Case Studies | Open Energy Information  

Open Energy Info (EERE)

Mini-Grid Renewable Energy Systems Case Studies Mini-Grid Renewable Energy Systems Case Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Mini-Grid Renewable Energy Systems Case Studies Agency/Company /Organization: World Bank Sector: Energy Topics: Market analysis, Co-benefits assessment, Background analysis Resource Type: Lessons learned/best practices, Case studies/examples Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, Country: Sri Lanka, Thailand, Chile, China, Peru, Mexico, Philippines Southern Asia, South-Eastern Asia, South America, Eastern Asia, South America, Central America, South-Eastern Asia References: Mini-Grid Renewable Energy Systems Case Studies[1] Resources Sri Lanka RE Program: village hydro China: Capacity Building for the Rapid Commercialization of

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Mini Grid Renewable Energy-Policy and Regulatory Studies | Open Energy  

Open Energy Info (EERE)

Mini Grid Renewable Energy-Policy and Regulatory Studies Mini Grid Renewable Energy-Policy and Regulatory Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Mini Grid Renewable Energy-Policy and Regulatory Studies Agency/Company /Organization: World Bank Sector: Energy Focus Area: Renewable Energy Topics: Implementation, Policies/deployment programs, Background analysis Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, Country: Peru, Philippines, Thailand South America, South-Eastern Asia, South-Eastern Asia References: Mini Grid Renewable Energy-Policy and Regulatory Studies[1] Resources Promoting Electrification: Regulatory Principles and a Model Law. Kilian Reich, Bernard Tenenbaum and Clemenica Torres, ESMAP Independent Evaluation of the ILZRO/RAPS Diesel/PV Hybrid System in

362

Technical and Economic Assessment of Off-grid, Mini-grid and Grid  

Open Energy Info (EERE)

Technical and Economic Assessment of Off-grid, Mini-grid and Grid Technical and Economic Assessment of Off-grid, Mini-grid and Grid Electrification Technologies Jump to: navigation, search Tool Summary Name: Technical and Economic Assessment of Off-grid, Mini-grid and Grid Electrification Technologies Agency/Company /Organization: World Bank Sector: Energy Focus Area: Energy Efficiency Topics: Resource assessment, Technology characterizations Website: siteresources.worldbank.org/EXTENERGY/Resources/336805-1157034157861/E References: Technical and Economic Assessment of Off-grid, Mini-grid and Grid Electrification Technologies[1] Summary "This report is part of the Energy and Water Department's commitment to providing new techniques and knowledge which complement the direct investment and other assistance to electrification as provided by the

363

Numerical simulation of micro/mini-channel based methane-steam reformer.  

E-Print Network (OSTI)

??Numerical modeling of methane-steam reforming is performed in a micro/mini-channel with heat input through catalytic channel walls. The low-Mach number, variable density Navier-Stokes equations together (more)

[No author

2010-01-01T23:59:59.000Z

364

System design description for mini-dacs data acquisition and control system  

DOE Green Energy (OSTI)

This document describes the hardware computer system, for the mini data acquisition and control system (DACS) that was fabricated by Los Alamos National Laboratory (LANL), to support the testing of the spare mixer pump for SY-101.

Vargo, F.G. Jr. [Westinghouse Hanford Co., Richland, WA (United States)] [Westinghouse Hanford Co., Richland, WA (United States); Trujillo, L.T. [Los Alamos National Lab., NM (United States)] [Los Alamos National Lab., NM (United States); Smith, S.O. [EG and G Energy Measurements, Inc., Las Vegas, NV (United States)] [EG and G Energy Measurements, Inc., Las Vegas, NV (United States)

1994-09-30T23:59:59.000Z

365

Measuring the Wind Vector Using the Autonomous Mini Aerial Vehicle M2AV  

Science Conference Proceedings (OSTI)

The meteorological mini unmanned aerial vehicle (M2AV) was used for measuring the meteorological wind. The wind is the vector difference between the aircraft speed relative to the earth (inertial velocity) and relative to the airflow (true ...

Aline van den Kroonenberg; Tim Martin; Marco Buschmann; Jens Bange; Peter Vrsmann

2008-11-01T23:59:59.000Z

366

NMR Imaging and Rheology Mini-Symposium Date: Friday, September 28th, 2012  

E-Print Network (OSTI)

NMR Imaging and Rheology Mini "Rheological NMR on polymers: flow, mixing, and polymer dynamics" Prof. Ulrich Scheler Leibniz Institute minute intermission 3:40 pm "Diffusion NMR measurements of surfactants in solutions and small- molecules

Ahlers, Guenter

367

The MiniBooNE detector technical design report  

SciTech Connect

The MiniBooNE experiment [1] is motivated by the LSND observation, [2] which has been interpreted as {nu}{sub {mu}} {yields} {nu}{sub e} oscillations, and by the atmospheric neutrino deficit, [3,4,5] which may be ascribed to {nu}{sub {mu}} oscillations into another type of neutrino. MiniBooNE is a single-detector experiment designed to: obtain {approx} 1000 {nu}{sub {mu}} {yields} {nu}{sub e} events if the LSND signal is due to {nu}{sub {mu}} {yields} {nu}{sub e} oscillations, establishing the oscillation signal at the > 5{sigma} level as shown in Fig. 1.1; extend the search for {nu}{sub {mu}} {yields} {nu}{sub e} oscillations significantly beyond what has been studied previously if no signal is observed; search for {nu}{sub {mu}} disappearance to address the atmospheric neutrino deficit with a signal that is a suppression of the rate of {nu}{sub {mu}}C {yields} {mu}N events from the expected 600,000 per year; measure the oscillation parameters as shown in Fig. 1.2 if oscillations are observed; and test CP conservation in the lepton sector if oscillations are observed by running with separate {nu}{sub {mu}} and {bar {nu}}{sub {mu}} beams. The detector will consist of a spherical tank 6.1 m (20 feet) in radius, as shown in Fig. 1.3, that stands in a 45-foot diameter cylindrical vault. An inner tank structure at 5.75 m radius will support 1280 8-inch phototubes (10% coverage) pointed inward and optically isolated from the outer region of the tank. The tank will be filled with 807 t of mineral oil, resulting in a 445 t fiducial volume. The outer tank volume will serve as a veto shield for identifying particles both entering and leaving the detector with 240 phototubes mounted on the tank wall. Above the detector tank will be an electronics enclosure that houses the fast electronics and data acquisition system and a utilities enclosure that houses the plumbing, overflow tank, and calibration laser. The detector will be located {approx} 550 m from the Booster neutrino source. The neutrino beam, produced using 8 GeV protons from the Booster at FNAL, will consist of a target within a focusing system, followed by a {approx}50 m long pion decay volume. The low energy, high intensity and 1 {micro}s time-structure of a neutrino beam produced from the Booster beam are ideal for this experiment. We assume that the Booster can reliably deliver protons for a typical run which is two-thirds of a calendar year. The sensitivities discussed above assume the experiment receives 5 x 10{sup 20} protons per year. This Booster experiment is compatible with the Fermilab collider and MI programs. The Booster must run at 7.5 Hz to accommodate the MiniBooNE and collider programs simultaneously. The current schedule calls for data-taking to begin by the end of calendar year 2001.

I. Stancu et al.

2003-04-18T23:59:59.000Z

368

Technical Specifications of Micro-Hydropower System Design and Implementation : Feasibility Analysis and Design of Lamaya Khola Micro-Hydro Power Plant.  

E-Print Network (OSTI)

??The purpose of this thesis is to first conduct a literature review regarding the technical specifications and design parametres required to design a working Micro (more)

Kunwor, Anil

2012-01-01T23:59:59.000Z

369

Mini-Brayton economic RTG study. Final report  

DOE Green Energy (OSTI)

The objective of this study is to demonstrate the applicability of a radioisotope heated Mini-Brayton power system to the 1973 USAF/AEC requirements established for the SURVSATCOM Mission. The principal requiremenets of the power system, are: 400 We power level; maximum weight 205 lbs.; $1.2 to 2.0 million per unit cost; and 5y mission duration. A radioisotope heat source that meets the ACE Nuclear Safety Criteria is presented. The major aspects of the Reference Design MB-ERTG are summarized. The Reference Design, utilizes a flexible Brayton rotating unit (BRU), a /sup 244/Cm heat source with ceramic clad fuel cylinders and an aluminum radiator. The flexible BRU has a variable power output capability, from 400 We to 3000 We, and is an important factor in the formulation of a cost effective development plan. The system weight is 186 lb and unit cost, including the /sup 244/Cm fuel, acceptance testing and delivery is $748,000. The total development cost for the 5-yr program is estimated at $16.4M with an additional $6.5M required for /sup 244/Cm heat source development support, /sup 244/Cm fuel, heat source fabrication and capital equipment expenditures. (LCL)

Not Available

1974-01-01T23:59:59.000Z

370

Clean Energy Manufacturing Resources - Technology Feasibility | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Feasibility Feasibility Clean Energy Manufacturing Resources - Technology Feasibility Clean Energy Manufacturing Resources - Technology Feasibility Find resources to help you evaluate the feasibility of your idea for a new clean energy technology or product. For determining feasibility, areas to consider include U.S. Department of Energy (DOE) priorities, licensing, R&D funding, and strategic project partnerships. For more resources, see the Clean Energy Manufacturing Federal Resource Guide. Learn About U.S. Department of Energy Priorities Advanced Manufacturing Office Plans - features information on analysis, plan implementations, and commercial outcomes. Bioenergy Technologies Office Plans - includes technology roadmaps, multiyear program plans, analysis, and more.

371

Manzanita Wind Energy Feasibility Study  

DOE Green Energy (OSTI)

The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit. Manzanita has explored the wind resource potential on tribal land and developed a business plan by means of this wind energy feasibility project, which enables Manzanita to make informed decisions when considering the benefits and risks of encouraging large-scale wind power development on their lands. Technical consultant to the project has been SeaWest Consulting, LLC, an established wind power consulting company. The technical scope of the project covered the full range of feasibility assessment activities from site selection through completion of a business plan for implementation. The primary objectives of this feasibility study were to: (1) document the quality and suitability of the Manzanita Reservation as a site for installation and long-term operation of a commercially viable utility-scale wind power project; and, (2) develop a comprehensive and financeable business plan.

Trisha Frank

2004-09-30T23:59:59.000Z

372

File:Federal Hydropower - U..S. Army Corps of Engineers.pdf | Open Energy  

Open Energy Info (EERE)

U..S. Army Corps of Engineers.pdf U..S. Army Corps of Engineers.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - U..S. Army Corps of Engineers.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 925 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:37, 22 May 2013 Thumbnail for version as of 15:37, 22 May 2013 1,275 × 1,650, 2 pages (925 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

373

Microsoft PowerPoint - ACOE Regional HydroPower Conference Presentation.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

FEDERAL FEDERAL HYDROPOWER CONFERENCE Tulsa, Oklahoma June 10 - 11, 2009 NERC Requirements for Generator Owner and Operator Sarah M. Blankenship, NERC Compliance Officer How do we create a culture that combines Processes, Policies and Procedures, PEOPLE and Technology? Development of an Internal NERC Compliance Program Applicable NERC Requirements for Functions GOP GO BAL-005-0 R1 CIP-001-1 R1R2 R3R4 (Sabotage Reporting) COM-002-2 R1(Communications) EOP-004-1 R2 R3 (Disturbance Reporting) Can be combined into an Integrated Plan with CIP-001-1 and CIP-008-1. EOP-009-0 R1 R2 (Regional Black Start Capability Plan) Applicable NERC Requirements for Functions GOP GO FAC-002-0 R1R2 (Coordination of Plans for New Facilities) FAC-008-1 R1 R1.1R1.2 R1.2.1R1.2.2 R1.3 R1.3.1R1.3.2

374

'Mini'-Roadmapping - Ensuring Timely Sites' Cleanup/Closure by Resolving Science & Technology Issues  

Science Conference Proceedings (OSTI)

Roadmapping is a powerful tool to manage technical risks and opportunities associated with complex problems. Roadmapping identifies technical capabilities required for both project- and program-level efforts and provides the basis for plans that ensure the necessary enabling activities will be done when needed. Roadmapping reveals where to focus further development of the path forward by evaluating uncertainties for levels of complexity, impacts, and/or the potential for large payback. Roadmaps can be customized to the application, a ''graded approach'' if you will. Some roadmaps are less detailed. We have called these less detailed, top-level roadmaps ''mini-roadmaps''. These mini roadmaps are created to tie the needed enablers (e.g., technologies, decisions, etc.) to the functions. If it is found during the mini-roadmapping that areas of significant risk exist, then those can be roadmapped further to a lower level of detail. Otherwise, the mini-roadmap may be sufficient to manage the project/program risk. Applying a graded approach to the roadmapping can help keep the costs down. Experience has indicated that it is best to do mini-roadmapping first and then evaluate the risky areas to determine whether to further evaluate those areas. Roadmapping can be especially useful for programs/projects that have participants from multiple sites, programs, or other entities which are involved. Increased synergy, better communications, and increased cooperation are the results from roadmapping a program/project with these conditions.

Luke, D.E.; Dixon, B.W.; Murphy, J.A.

2003-01-14T23:59:59.000Z

375

Reduced Spill at Hydropower Dams: Opportunities for More Generation and Increased Fish Population  

DOE Green Energy (OSTI)

This report indicates that reduction of managed spill at hydropower dams can speed implementation of technologies for fish protection and achieve economic goals. Spill of water over spillways is managed in the Columbia River basin to assist downstream-migrating juvenile salmon, and is generally believed to be the most similar to natural migration, benign and effective passage route; other routes include turbines, intake screens with bypasses, and surface bypasses. However, this belief may be misguided, because spill is becoming recognized as less than natural, with deep intakes below normal migration depths, and likely causing physical damages from severe shear on spillways, high turbulence in tail waters, and collisions with baffle blocks that lead to disorientation and predation. Some spillways induce mortalities comparable to turbines. Spill is expensive in lost generation, and controversial. Fish-passage research is leading to more fish-friendly turbines, screens and bypasses that are more effective and less damaging, and surface bypasses that offer passage of more fish per unit water volume than does spill (leaving more water for generation). Analyses by independent economists demonstrated that goals of increased fish survival over the long term and net gain to the economy can be obtained by selectively reducing spill and diverting some of the income from added power generation to research, development, and installation of fish-passage technologies. Such a plan would selectively reduce spill when and where least damaging to fish, increase electricity generation using the water not spilled and use innovative financing to direct monetary gains to improving fish passage.

Coutant, Charles C [ORNL; Mann, Roger [RMecon, Davis, California; Sale, Michael J [ORNL

2006-09-01T23:59:59.000Z

376

Fish behavior in relation to modeling fish passage through hydropower turbines: A review  

DOE Green Energy (OSTI)

We evaluated the literature on fish behavior as it relates to passage of fish near or through hydropower turbines. The goal was to foster compatibility of engineered systems with the normal behavior patterns of fish species and life stages such that entrainment into turbines and injury in passage are minimized. We focused on aspects of fish behavior that could be used for computational fluid dynamics (CFD) modeling of fish trajectories through turbine systems. Downstream-migrating salmon smolts are generally surface oriented and follow flow. Smolts orient to the ceilings of turbine intakes but are horizontally distributed more evenly, except as affected by intake-specific turbulence and vortices. Smolts often enter intakes oriented head-upstream. Non-salmonids are entrained episodically, suggesting accidental capture of schools (often of juveniles or in cold water) and little behavioral control during turbine passage. Models of fish trajectories should not assume neutral buoyancy throughout the time a fish passes through a turbine, largely because of pressure effects on swim bladders. Fish use their lateral line system to sense obstacles and change their orientation, but this sensory-response system may not be effective in the rapid passage times of turbine systems. A Effects of pre-existing stress levels on fish performance in turbine passage are not well known but may be important. There are practical limits of observation and measurement of fish and flows in the proximity of turbine runners that may inhibit development of information germane to developing a more fish-friendly turbine. We provide recommendations for CFD modelers of fish passage and for additional research. 20 refs., 2 figs.

Coutant, C.C. [Oak Ridge National Lab., TN (United States); Whitney, R.R.

1997-06-01T23:59:59.000Z

377

Hualapai Wind Project Feasibility Report  

SciTech Connect

The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

Davidson, Kevin [Hualapai Tribe] [Hualapai Tribe; Randall, Mark [Daystar Consulting] [Daystar Consulting; Isham, Tom [Power Engineers] [Power Engineers; Horna, Marion J [MJH Power Consulting LLC] [MJH Power Consulting LLC; Koronkiewicz, T [SWCA Environmental, Inc.] [SWCA Environmental, Inc.; Simon, Rich [V-Bar, LLC] [V-Bar, LLC; Matthew, Rojas [Squire Sanders Dempsey] [Squire Sanders Dempsey; MacCourt, Doug C. [Ater Wynne, LLP] [Ater Wynne, LLP; Burpo, Rob [First American Financial Advisors, Inc.] [First American Financial Advisors, Inc.

2012-12-20T23:59:59.000Z

378

SYNCHEM feasibility report: Phase 1  

Science Conference Proceedings (OSTI)

Several Czech and US companies have entered into a development agreement for the purposes of determining the technical and economic feasibility and overall financeability of an integrated gasification combined cycle (IGCC) regional energy facility to be located adjacent to the Chemopetrol refinery in Litvinov, Czech Republic. The Project would use a feedstock comprised of coal supplied by Doly a upravny Komorany s.p. (DUK) coal mining company and mined from the Most/Litvinov area together with high sulfur residual oils from the Chemopetrol refinery. When gasified together with oxygen from an Air Products air separation plant, and based on an average yearly consumption of 2,100K metric tons per year of coal (as delivered) and 630K tonnes per year of oil, approximately 11 million normal cubic meters per day of syngas will be produced. At its current projected design capacity, when combusted in two General Electric advanced technology Frame 9FA gas turbines, the Project will produce approximately 690MW of electric power; 250 metric tons/hour of steam for process; and 135 thermal equivalent MW of district heat. The Feasibility Phase efforts described in this report indicate the real possibility for a successful and profitable IGCC Project for the Czech Republic. It is therefore incumbent upon all the Project Participants to review and evaluate the information contained herein such that a go/no-go decision can be reached by early next year.

Not Available

1995-01-01T23:59:59.000Z

379

A study of a turbine-generator system for low-head hydropower  

Science Conference Proceedings (OSTI)

A method is outlined for determining the optimum operating conditions of a turbine-generator unit installed across a low-head irrigation structure for electrical power generation. For a given regulator's characteristic, the unit's rated power and design parameters are determined such that its cost-benefit ratio is minimum. The economical feasibility of the microhydro plant is studied by comparing its life-time cost to its lifetime benefit. The benefit is determined by the cost of the corresponding energy generated through a dieseldriven generator set. The microhydro plant was found to be economically feasible over a wide range of inflation and interest rates.

Mankbadi, R.R.; Mikhail, S.

1985-03-01T23:59:59.000Z

380

Assessment of Dissolved Oxygen Mitigation at Hydropower Dams Using an Integrated Hydrodynamic/Water Quality/Fish Growth Model  

DOE Green Energy (OSTI)

Dissolved oxygen (DO) in rivers is a common environmental problem associated with hydropower projects. Approximately 40% of all FERC-licensed projects have requirements to monitor and/or mitigate downstream DO conditions. Most forms of mitigation for increasing DO in dam tailwaters are fairly expensive. One area of research of the Department of Energy's Hydropower Program is the development of advanced turbines that improve downstream water quality and have other environmental benefits. There is great interest in being able to predict the benefits of these modifications prior to committing to the cost of new equipment. In the case of turbine replacement or modification, there is a need for methods that allow us to accurately extrapolate the benefits derived from one or two turbines with better design to the replacement or modification of all turbines at a site. The main objective of our study was to demonstrate a modeling approach that integrates the effects of flow and water quality dynamics with fish bioenergetics to predict DO mitigation effectiveness over long river segments downstream of hydropower dams. We were particularly interested in demonstrating the incremental value of including a fish growth model as a measure of biological response. The models applied are a suite of tools (RMS4 modeling system) originally developed by the Tennessee Valley Authority for simulating hydrodynamics (ADYN model), water quality (RQUAL model), and fish growth (FISH model) as influenced by DO, temperature, and available food base. We parameterized a model for a 26-mile reach of the Caney Fork River (Tennessee) below Center Hill Dam to assess how improvements in DO at the dam discharge would affect water quality and fish growth throughout the river. We simulated different types of mitigation (i.e., at the turbine and in the reservoir forebay) and different levels of improvement. The model application successfully demonstrates how a modeling approach like this one can be used to assess whether a prescribed mitigation is likely to meet intended objectives from both a water quality and a biological resource perspective. These techniques can be used to assess the tradeoffs between hydropower operations, power generation, and environmental quality.

Bevelhimer, Mark S [ORNL; Coutant, Charles C [ORNL

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Hydropower computerized reconnaissance package version 2. 0. [HYDRO-CAL, PAPER-ECON, and HYDRO-ECON  

DOE Green Energy (OSTI)

The Hydropower Computerized Reconnaissance (HCR) Package is a computerized preliminary engineering and economic study package for small hydroelectric projects which consists of three programs developed at the Idaho National Engineering Laboratory. One engineering program evaluates the flow characteristics of a site and determines the energy generated for various turbine configurations and two economic programs provide two levels of economic studies depending upon the amount of site-specific information available. An Apple II computer is utilized to provide a quick-turnaround capability. The models and methods used in the HCR package are described, and information is provided on program application, sample run sessions, program outputs, and listings of the main programs.

Broadus, C.R.

1981-04-01T23:59:59.000Z

382

Clean Stuff: the Latest from NOVA's "Making Stuff" Mini-Series | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Stuff: the Latest from NOVA's "Making Stuff" Mini-Series Clean Stuff: the Latest from NOVA's "Making Stuff" Mini-Series Clean Stuff: the Latest from NOVA's "Making Stuff" Mini-Series February 4, 2011 - 3:27pm Addthis Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science What are the key facts? Materials Science technology of transforming plastics - say from grocery bags - into carbon nanotubes and spheres, which can then be used in lithium-ion batteries, can be used for an array of other applications. The same technology can be used to produce the anti-malarial drug artemisinin thereby reducing its price, and increasing its availability, to people in the developing world. After yet another Snowpocalypse, everyone's beginning to think spring. Presumably that includes Punxsutawney Phil, who called for an early one

383

Mini-Conference on the First Microns of the First Wall  

Science Conference Proceedings (OSTI)

Interactions between plasmas and their surrounding materials (plasma facing components) are of great interest to present and future magnetic fusion experiments, and ITER [ITER Physics Basis Editors, ITER Physics Exper Group Chairs, ITER Joint Central Team, and Physics Inte gration Unit, Nucl. Fusion 39, 2137 (1999)] in particular. This interest is the result of concerns with the survivability of these materials, as well as the impact of these interactions back on the plasma. These interactions begin on the surface, but can have consequences a few microns into the material.This mini-conference on these "first microns" was designed to bring to the Division of Plasma Physics Meeting experts on these topics who would otherwise not attend. At the same time, the mini-conference was intended to expose the broader fusion community to these issues. The mini-conference covered in three, half-day sessions the topics of lithium coatings and surfaces, mixed materials characteristics, and issues associated with graphite.

D.P. Stotler, T.D. Rognlien and S.I. Krasheninnikov

2008-03-20T23:59:59.000Z

384

Feasibility Study | OpenEI  

Open Energy Info (EERE)

23 23 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142280123 Varnish cache server Feasibility Study Dataset Summary Description Reduction of global greenhouse gas emission to arrest global warming requires minimizing the use of fossil fuels. To achieve this a large scale use of renewable energies must be made over the globe for production of electrical and thermal energy. Success of wind and solar energy projects require detailed and precise information on the resources. For most developing countries adequate information on the resources are not available. Source Renewable Energy Research Centre, University of Dhaka Date Released February 19th, 2007 (7 years ago)

385

MiniBooNE as related to Windows on the Universe  

SciTech Connect

The measurement of absolute neutrino and anti-neutrino cross-sections, the observation of a 'low energy anomaly' in the neutrino sector, the constraints placed on the LSND effect by a non-observation of neutrino oscillations, the search for neutrino and anti-neutrino appearance, and for the possible existence of new heavy particles makes MiniBooNE a major contributor to the current view of the Universe. This paper addresses specific model constraints set by the MiniBooNE data, and explores expectations for further remaining analysis of the data.

Stefanski, Ray; /Fermilab

2009-12-01T23:59:59.000Z

386

Neuro-fuzzy controller of low head hydropower plants using adaptive-network based fuzzy inference system  

Science Conference Proceedings (OSTI)

This paper presents an attempt of nonlinear, multivariable control of low-head hydropower plants, by using adaptive-network based fuzzy inference system (ANFIS). The new design technique enhances fuzzy controllers with self-learning capability for achieving prescribed control objectives in a near optimal manner. The controller has flexibility for accepting more sensory information, with the main goal to improve the generator unit transients, by adjusting the exciter input, the wicket gate and runner blade positions. The developed ANFIS controller whose control signals are adjusted by using incomplete on-line measurements, can offer better damping effects to generator oscillations over a wide range of operating conditions, than conventional controllers. Digital simulations of hydropower plant equipped with low-head Kaplan turbine are performed and the comparisons of conventional excitation-governor control, state-feedback optimal control and ANFIS based output feedback control are presented. To demonstrate the effectiveness of the proposed control scheme and the robustness of the acquired neuro-fuzzy controller, the controller has been implemented on a complex high-order non-linear hydrogenerator model.

Djukanovic, M.B. [Inst. Nikola Tesla, Belgrade (Yugoslavia). Dept. of Power Systems; Calovic, M.S. [Univ. of Belgrade (Yugoslavia). Dept. of Electrical Engineering; Vesovic, B.V. [Inst. Mihajlo Pupin, Belgrade (Yugoslavia). Dept. of Automatic Control; Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States)

1997-12-01T23:59:59.000Z

387

Neural-net based coordinated stabilizing control for the exciter and governor loops of low head hydropower plants  

Science Conference Proceedings (OSTI)

This paper presents a design technique of a new adaptive optimal controller of the low head hydropower plant using artificial neural networks (ANN). The adaptive controller is to operate in real time to improve the generating unit transients through the exciter input, the guide vane position and the runner blade position. The new design procedure is based on self-organization and the predictive estimation capabilities of neural-nets implemented through the cluster-wise segmented associative memory scheme. The developed neural-net based controller (NNC) whose control signals are adjusted using the on-line measurements, can offer better damping effects for generator oscillations over a wide range of operating conditions than conventional controllers. Digital simulations of hydropower plant equipped with low head Kaplan turbine are performed and the comparisons of conventional excitation-governor control, state-space optimal control and neural-net based control are presented. Results obtained on the non-linear mathematical model demonstrate that the effects of the NNC closely agree with those obtained using the state-space multivariable discrete-time optimal controllers.

Djukanovic, M.; Novicevic, M.; Dobrijevic, D.; Babic, B. [Electrical Engineering Inst. Nikola Tesla, Belgrade (Yugoslavia); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States); Pao, Y.H. [Case Western Reserve Univ., Cleveland, OH (United States)]|[AI WARE, Inc., Cleveland, OH (United States)

1995-12-01T23:59:59.000Z

388

Republic of Bulgaria Sreden Iskar Cascade hydropower development. Application for participation under the United States Initiative on Joint Implementation  

DOE Green Energy (OSTI)

Interest in water resources and hydropower has been low in Bulgaria for over 20 years and only about 33% of the potential hydropower available to the Country are currently being utilized. This is due in part to past design practices that utilized large reservoirs to regulate runoff and create the necessary head. The Iskar River does not allow for the typical design. However, in recent years, technical advancement in machinery design and more efficient turbine-generators has led to the development of low-head hydro projects. Studies determined that the Iskar Cascade can support low-head hydro development and could provide as much as 93 MW of capacity. This project will initially consist of the construction of three hydroelectric facilities along a 120-km section of the Iskar river in western Bulgaria. Each facility will consist of a powerhouse (housing a turbine and generator), an embankment dam, a concrete spillway with regulating gates, a fish passage, and associated transformers and switchgear. This report gives a description of the project, its sources of funding for specific measures to reduce greenhouse gas emissions, forecasts of greenhouse gas emissions with and without these specific measures, and other environmental considerations.

NONE

1998-11-01T23:59:59.000Z

389

Renewable Energy Feasibility Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Feasibility Study Renewable Energy Feasibility Study Renewable Energy Feasibility Study October 16, 2013 - 4:48pm Addthis After a Federal agency has identified probable technologies through the screening process, a detailed review of the feasibility and economic viability of each renewable energy technology, also called a renewable energy feasibility study, can determine which combination of renewable energy technologies most effectively meet the energy requirements and goals. When integrating renewable energy into a new construction project or major renovation, this level of renewable energy assessment will typically be commissioned by the design team and should be completed during to the schematic design phase. While a screening looks at the viability of each type of renewable energy, a feasibility study gets into details used to

390

Preliminary Screening for Project Feasibility and Applications...  

NLE Websites -- All DOE Office Websites (Extended Search)

Best Practices Preliminary Screening for Project Feasibility and Applications for Geothermal Heat Pump Retrofit Projects GHPs Should Always be Considered for Federal Sites...

391

Design Feasibility Analysis and Optimization under Uncertainty...  

NLE Websites -- All DOE Office Websites (Extended Search)

Feasibility Analysis and Optimization under Uncertainty - A Bayesian Optimal Decision Framework Speaker(s): Jose M. Ortega Date: October 7, 2003 - 12:00pm Location: Bldg. 90...

392

Effects of Flaming Gorge Dam hydropower operations on sediment transport in the Browns Park reach of the Green River, Utah and Colorado  

DOE Green Energy (OSTI)

Three methods for comparing sediment transport were applied to four proposed hydropower operational scenarios under study for Flaming Gorge Dam on the Green River in Utah. These methods were effective discharge, equilibrium potential, and cumulative sediment load with flow exceedance plots. Sediment loads transported by the Green River in the Browns Park reach were calculated with the Engelund-Hansen equation for three historical water years and four hydropower operational scenarios. A model based on the Engelund-Hansen equation was developed using site-specific information and validated by comparing predictions for a moderate water year with measured historical values. The three methods were used to assess the impacts of hydropower operational scenarios on sediment resources. The cumulative sediment load method provided the most useful information for impact evaluation. Effective discharge was not a useful tool because of the limited number of discrete flows associated with synthetic hydrographs for the hydropower operational scenarios. The equilibrium potential method was relatively insensitive to the variations in operating conditions, rendering it comparatively ineffective for impact evaluation.

Williams, G.P.; Tomasko, D.; Cho, H.E.; Yin, S.C.L. [Argonne National Lab., IL (United States). Environmental Assessment Div.

1995-05-01T23:59:59.000Z

393

Muon muon collider: Feasibility study  

Science Conference Proceedings (OSTI)

A feasibility study is presented of a 2 + 2 TeV muon collider with a luminosity of L = 10{sup 35} cm{sup {minus}2} s{sup {minus}1}. The resulting design is not optimized for performance, and certainly not for cost; however, it does suffice--the authors believe--to allow them to make a credible case, that a muon collider is a serious possibility for particle physics and, therefore, worthy of R and D support so that the reality of, and interest in, a muon collider can be better assayed. The goal of this support would be to completely assess the physics potential and to evaluate the cost and development of the necessary technology. The muon collider complex consists of components which first produce copious pions, then capture the pions and the resulting muons from their decay; this is followed by an ionization cooling channel to reduce the longitudinal and transverse emittance of the muon beam. The next stage is to accelerate the muons and, finally, inject them into a collider ring which has a small beta function at the colliding point. This is the first attempt at a point design and it will require further study and optimization. Experimental work will be needed to verify the validity of diverse crucial elements in the design.

NONE

1996-06-18T23:59:59.000Z

394

TurboCap: A Batteryless, Supercapacitor-based Power Supply for Mini-FDPM  

E-Print Network (OSTI)

TurboCap: A Batteryless, Supercapacitor-based Power Supply for Mini-FDPM Chulsung Park1 , KeunsikCap, a batteryless, supercapacitor-based power supply subsystem for a handheld, laser-based breast cancer detector on the selection of supercapacitor topology for conversion efficiency and for form- factor minimization

Shinozuka, Masanobu

395

Charged current single pion cross section measurement at MiniBooNE  

SciTech Connect

We present MiniBooNE's preliminary {nu}{sub {mu}} CC1{pi}{sup +} cross section measurement, calculated using the ratio of CC1{pi}{sup +} to CCQE events. We find the inclusive CC1{pi}{sup +} measurement to be below the nuance [1] and NEUGEN [2] expectations.

Wascko, M.O.; /Louisiana State U.

2006-02-01T23:59:59.000Z

396

Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005  

Energy.gov (U.S. Department of Energy (DOE))

The articles in this collection, organized by topic, contain procedural interpretations and recommendations developed by the DOE Office of NEPA Policy and Compliance in consultation with the Office of General Counsel, the DOE NEPA Community, and others. The mini-guidance articles were developed to address problems identified in the course of preparing, reviewing, and issuing NEPA documents.

397

Performance Characterization and Remedy of Experimental CuInGaSe2 Mini-Modules: Preprint  

DOE Green Energy (OSTI)

We employed current-voltage (I-V), quantum efficiency (QE), photoluminescence (PL), electroluminescence (EL), lock-in thermography (LIT), and (electrochemical) impedance spectroscopy (ECIS) to complementarily characterize the performance and remedy for two pairs of experimental CuInGaSe2 (CIGS) mini-modules. One pair had the three scribe-lines (P1/P2/P3) done by a single pulse-programmable laser, and the other had the P2/P3 lines by mechanical scribe. Localized QE measurements for each cell strip on all four mini-modules showed non-uniform distributions that correlated well with the presence of performance-degrading strips or spots revealed by PL, EL, and LIT imaging. Performance of the all-laser-scribed mini-modules improved significantly by adding a thicker Al-doped ZnO layer and reworking the P3 line. The efficiency on one of the all-laser-scribed mini-modules increased notably from 7.80% to 8.56% after the performance-degrading spots on the side regions along the cell array were isolated by manual scribes.

Pern, F. J.; Yan, F.; Mansfield, L.; Glynn, S.; Rekow, M.; Murion, R.

2011-07-01T23:59:59.000Z

398

Sault Tribe Wind Energy Feasibility Study  

DOE Green Energy (OSTI)

The Sault Tribe conducted a feasibility study on tribal lands in the Upper Peninsula of Michigan to determine the technical and economic feasibility of both small and large-scale wind power development on tribal lands. The study included a wind resource assessment, transmission system analysis, engineering and regulatory analyzes and assessments.

Toni Osterhout; Global Energy Concepts

2005-07-31T23:59:59.000Z

399

Quality of mini-peeled carrots as affected by genotype, minimal processing and edible coating  

E-Print Network (OSTI)

Minimally processed vegetables provide convenience, fresh characteristics and human health benefits. Some fresh carrots are minimally processed by abrasive peelers and washed to remove cellular fluids to produce carrot sticks, mini peeled carrots and grated carrots. Shelf life and acceptability of packaged minimally processed carrots is sometimes limited by a white discoloration that develops on abraded surfaces during storage, and poor flavor. This study was undertaken to investigate the effects of genotype, minimal processing and edible coating treatment on quality of mini-peeled carrots. Genotypic variations in total terpenoids, sugars, phenolics, total carotenoids and sensory attributes were observed (P>0.05). Among experimental hybrids evaluated TX30129 had the highest sugar and carotenoid levels. White surface discoloration on mini-peeled carrots was noted 7 days after processing. Total sugars, sucrose, total carotenoids and volatile terpenoid levels decreased during storage. Total soluble phenolics increased up to 14 days storage and then declined. Edible coating treatment effectively retarded white surface discoloration without diminishing microbial or chemical quality of mini-peeled carrots. Sensory scores for fresh carrot flavor, fresh carrot aroma and overall acceptability were higher for coated carrots. An application rate of 0.23-0.49 L/min appeared adequate for protection against surface discoloration and for retention of flavor. Terpenoid and carotene contents declined within 3 days after processing. Edible coating treatment did not affect terpenoid or carotenoid levels during storage. Apparently, Nature SeaTM coating had poor barrier characteristics since volatile terpenoids readily diffused through the coating during storage. Carotene losses during peeling were most likely associated with enzymatic activity or increased exposure to oxygen. Packaging mini-peeled carrots under reduced oxygen conditions may retard carotene loss.

Dewi, Tjin Tjin

1995-01-01T23:59:59.000Z

400

Experimental study of oxy-fuel combustion and sulfur capture in a mini-CFBC  

SciTech Connect

Oxy-fuel technology uses effectively pure oxygen for fossil fuel combustion in order to obtain a highly concentrated CO{sub 2} stream, suitable for direct compression and sequestration. It is an effective technology to reduce greenhouse gas emissions to the atmosphere from large point sources such as power generation plants. Oxy-fuel FBC technology has the combined advantage of producing high CO{sub 2} concentration flue gas and allowing excellent fuel flexibility. In addition, with external cooling of the recirculated solids, the flue gas recirculation ratio can be reduced. CETC-Ottawa has carried out oxy-fuel fluidized bed combustion with flue gas recirculation on its modified mini-CFBC. The mini-CFBC has an internal diameter of 100 mm and internal height of 5000 mm. Both bituminous and sub-bituminous coals were fired. Limestone was premixed with coal and fed to the mini-CFBC. Recirculated solids were cooled in the return leg of the mini-CFBC. The bed temperature was controlled at about 850{sup o}C, while the oxygen concentration in the primary gas was about 25% and in the secondary gas was about 50%. With flue gas recycle, the CO{sub 2} concentration in the flue gas reached 82-90%. Sulfur capture efficiency and CO and NOx concentrations were also measured and were all at acceptable levels. The transition from air firing to oxy-fuel firing was a fast and relatively smooth process, and operation of the mini-CFBC under oxy-fuel firing conditions was similar to that of air firing. 15 refs., 4 figs., 3 tabs.

L. Jia; Y. Tan; C. Wang; E.J. Anthony [Natural Resources Canada, Ottawa, ON (Canada)

2007-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Evaluating greenhouse gas emissions from hydropower complexes on large rivers in Eastern Washington  

Science Conference Proceedings (OSTI)

Water bodies, such as freshwater lakes, are known to be net emitters of carbon dioxide (CO2), and methane (CH4). In recent years, significant greenhouse gas (GHG) emissions from tropical, boreal, and mid-latitude reservoirs have been reported. At a time when hydropower is increasing worldwide, better understanding of seasonal and regional variation in GHG emissions is needed in order to develop a predictive understanding of such fluxes within man-made impoundments. We examined power-producing dam complexes within xeric temperate locations in the northwestern United States. Sampling environments on the Snake (Lower Monumental Dam Complex) and Columbia Rivers (Priest Rapids Dam Complex) included tributary, mainstem, embayment, forebay, and tailrace areas during winter and summer 2012. At each sampling location, GHG measurement pathways included surface gas flux, degassing as water passed through dams during power generation, ebullition within littoral embayments, and direct sampling of hyporheic pore-water. Measurements were also carried out in a free-flowing reach of the Columbia River to estimate unaltered conditions. Surface flux resulted in very low emissions, with reservoirs acting as a sink for CO2 (up to 262 mg m-2 d-1, which is within the range previously reported for similarly located reservoirs). Surface flux of methane remained below 1 mg CH4 m-2d-1, a value well below fluxes reported previously for temperate reservoirs. Water passing through hydroelectric projects acted as a sink for CO2 during winter and a small source during summer, with mean degassing fluxes of 117 and 4.5 t CO2 d-1, respectively. Degassing of CH4 was minimal, with mean fluxes of 3.1 10-6 and 5.6 10-4 t CH4 d-1 during winter and summer, respectively. Gas flux due to ebullition was greater in coves located within reservoirs than in coves within the free flowing Hanford Reachand CH4 flux exceeded that of CO2. Methane emissions varied widely across sampling locations, ranging from 10.5 to 1039 mg CH4 m-2 d-1, with mean fluxes of 324 mg CH4 m-2 d-1in Lower Monumental Dam reservoir and 482 mg CH4 m-2d-1 in the Priest Rapids Dam reservoir. The magnitude of methane flux due to ebullition was unexpectedly high, and falls within the range recently reported for other temperate reservoirs around the world, further suggesting that this methane source should be considered in estimates of global greenhouse gas emissions. Methane flux from sediment pore-water within littoral embayments averaged 4.2 mg m-2 d-1 during winter and 8.1 mg m-2 d-1 during summer, with a peak flux of 19.8 mg m-2d-1 (at the same location where CH4 ebullition was also the greatest). Carbon dioxide flux from sediment pore-water averaged approximately 80 mg m-2d-1 with little difference between winter and summer. Similar to emissions from ebullition, flux from sediment pore-water was higher in reservoirs than in the free flowing reach.

Arntzen, Evan V.; Miller, Benjamin L.; O'Toole, Amanda C.; Niehus, Sara E.; Richmond, Marshall C.

2013-03-15T23:59:59.000Z

402

New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)  

Wind Powering America (EERE)

5 - January 2010 5 - January 2010 Two 600-kW wind turbines were installed on Deer Island in August 2009 next to the wastewater treatment facility's anaerobic digesters. Due to their proximity to Logan Airport, these generators were installed on unusually short 32-meter towers. WIND AND HYDROPOWER TECHNOLOGIES PROGRAM continued on page 2 > Kathryn Craddock, Sustainable Energy Advantage, LLC/PIX16710 Wind Projects Sprout Throughout New England NEWF is pleased to provide you with its fifth edition of the electronic NEWF newsletter. This newsletter provides updates on a broad range of project proposals and policy initiatives across New England during the funding hiatus...consider it a "catch-up" double issue. In past newsletters, we've relied on wind farm photo-simulations, photos of early construction

403

Multnomah County Hydrokinetic Feasibility Study: Final Feasibility Study Report  

Science Conference Proceedings (OSTI)

HDR has completed a study of the technical, regulatory, and economic feasibility of installing hydrokinetic turbines under the Morrison, Broadway, and Sellwood bridges. The primary objective of installing hydrokinetic turbines is a demonstration of in-stream hydrokinetic technologies for public education and outreach. Due to the low gradient of the Lower Willamette and the effects of the tide, velocities in the area in consideration are simply not high enough to economically support a commercial installation. While the velocities in the river may at times provide enough energy for a commercial turbine to reach capacity, the frequency and duration of high flow events which provide suitable velocities is not sufficient to support a commercial hydrokinetic installation. We have observed that over an 11 year period, daily average velocities in the Lower Willamette exceeded a nominal cut-in speed of 0.75 m/s only 20% of the time, leaving net zero power production for the remaining 80% of days. The Sellwood Bridge site was estimated to have the best hydrokinetic resource, with an estimated average annual production of about 9,000 kWh. The estimated production could range from 2,500 kWh to 15,000 kWh. Based on these energy estimates, the amount of revenue generated through either a power purchase agreement (PPA) or recovered through net metering is not sufficient to repay the project costs within the life of the turbine. The hydrokinetic resource at the Morrison and Broadway Bridges is slightly smaller than at the Sellwood Bridge. While the Broadway and Morrison Bridges have existing infrastructure that could be utilized, the project is not expected to generate enough revenue to repay the investment. Despite low velocities and energy production, the sites themselves are favorable for installation of a demonstration or experimental project. With high public interest in renewable energy, the possibility exists to develop a hydrokinetic test site which could provide developers and scientists a location to temporarily deploy and test hydrokinetic devices, and also function as an educational tool for the general public. Bridge piers provide an excellent pre-existing anchor point for hydrokinetic devices, and existing infrastructure at the Morrison and Broadway Bridges may reduce installation costs. Opportunity exists to partner with local universities with engineering and environmental interest in renewable energy. A partnership with Portland State University?¢????s engineering school could provide students with an opportunity to learn about hydrokinetics through senior design projects. Oregon State University and University of Washington, which are partnered through the Northwest National Marine Renewable Energy Center (NNMREC) to study and test hydrokinetic technology, are also relatively local to the site. In addition to providing an opportunity for both public and private entities to learn technically about in-stream kinetics, this approach will encourage grant funding for outreach, education, and product development, while also serving as a positive community relations opportunity for the County and its partners.

Stephen Spain

2012-03-15T23:59:59.000Z

404

WERF MACT Feasibility Study Report  

SciTech Connect

This study was undertaken to determine the technical feasibility of upgrading the Waste Experimental Reduction Facility (WERF) at the Idaho National Engineering and Environmental Laboratory to meet the offgas emission limits proposed in the Maximum Achievable Control Technologies (MACT)rule. Four practicable offgas treatment processes were identified, which, if installed, would enable the WERF to meet the anticipated MACT emission limits for dioxins and furans (D/F), hydrochloric acid (HCI), and mercury (Hg). Due to the three-year time restraint for MACT compliance, any technology chosen for the upgrade must be performed within the general plant project funding limit of $5 M. The option selected consists of a partial-quench evaporative cooler with dry sorbent injection for HCI removal followed by a sulfur-impregnated activated carbon bed for Hg control. The planning cost estimate for implementing the option is $4.17 M (with 24% contingency). The total estimated cost includes capital costs, design and construction costs, and project management costs. Capital costs include the purchase of a new offgas evaporative cooler, a dry sorbent injection system with reagent storage, a new fabric filter baghouse, a fixed carbon bed absorber, and two offgas induced draft exhaust fans. It is estimated that 21 months will be required to complete the recommended modification to the WERF. The partial-quench cooler is designed to rapidly cool the offgas exiting the secondary combustion chamber to minimize D/F formation. Dry sorbent injection of an alkali reagent into the offgas is recommended. The alkali reacts with the HCI to form a salt, which is captured with the fly ash in the baghouse. A design HCI removal efficiency of 97.2% allows for the feeding 20 lbs/hr of chlorine to the WERF incinerator. The sorbent feed rate can be adjusted to achieve the desired HCI removal efficiency. A fixed bed of sulfur-impregnated carbon was conservatively sized for a total Hg removal capacity when feeding 10 g/hr Hg to the WERF incinerator. An added benefit for using carbon adsorption is that the activated carbon will also capture a large fraction of any residual D/F present in the offgas.

B. Bonnema; D. Moser; J. Riedesel; K. Kooda; K. Liekhus; K. Rebish; S. Poling

1998-11-01T23:59:59.000Z

405

Potential effects of four Flaming Gorge Dam hydropower operational scenarios on riparian vegetation of the Green River, Utah and Colorado  

DOE Green Energy (OSTI)

Four hydropower operational scenarios at Flaming Gorge Dam were evaluated to determine their potential effects on riparian vegetation along the Green River in Utah and Colorado. Data collected in June 1992 indicated that elevation above the river had the largest influence on plant distribution. A lower riparian zone occupied the area between the approximate elevations of 800 and 4,200-cfs flows--the area within the range of hydropower operational releases. The lower zone was dominated by wetland plants such as cattail, common spikerush, coyote willow, juncus, and carex. An upper riparian zone was above the elevation of historical maximum power plant releases from the dam (4,200 cfs), and it generally supported plants adapted to mesic, nonwetland conditions. Common species in the upper zone included box elder, rabbitbrush, grasses, golden aster, and scouring rush. Multispectral aerial videography of the Green River was collected in May and June 1992 to determine the relationship between flow and the areas of water and the riparian zone. From these relationships, it was estimated that the upper zone would decrease in extent by about 5% with year-round high fluctuation, seasonally adjusted high fluctuation, and seasonally adjusted moderate fluctuation, but it would increase by about 8% under seasonally adjusted steady flow. The lower zone would increase by about 13% for both year-round and seasonally adjusted high fluctuation scenarios but would decrease by about 40% and 74% for seasonally adjusted moderate fluctuation and steady flows, respectively. These changes are considered to be relatively minor and would leave pre-dam riparian vegetation unaffected. Occasional high releases above power plant capacity would be needed for long-term maintenance of this relict vegetation.

LaGory, K.E.; Van Lonkhuyzen, R.A. [Argonne National Lab., IL (United States). Ecological Sciences Section

1995-06-01T23:59:59.000Z

406

Searches for New Physics at MiniBooNE: Sterile Neutrinos and Mixing Freedom  

SciTech Connect

The MiniBooNE experiment was designed to perform a search for {nu}{sub {mu}} {yields} {nu}{sub e} oscillations in a region of {Delta}m{sup 2} and sin{sup 2} 2{theta} very different from that allowed by standard, three-neutrino oscillations, as determined by solar and atmospheric neutrino experiments. This search was motivated by the LSND experimental observation of an excess of {bar {nu}}{sub e} events in a {bar {nu}}{sub {mu}} beam which was found compatible with two-neutrino oscillations at {Delta}m{sup 2} {approx} 1 eV{sup 2} and sin{sup 2} 2{theta} < 1%. If confirmed, such oscillation signature could be attributed to the existence of a light, mostly-sterile neutrino, containing small admixtures of weak neutrino eigenstates. In addition to a search for {nu}{sub {mu}} {yields} {nu}{sub e} oscillations, MiniBooNE has also performed a search for {bar {nu}}{sub {mu}} {yields} {bar {nu}}{sub e} oscillations, which provides a test of the LSND two-neutrino oscillation interpretation that is independent of CP or CPT violation assumptions. This dissertation presents the MiniBooNE {nu}{sub {mu}} {yields} {nu}{sub e} and {bar {nu}}{sub {mu}} {yields} {bar {nu}}{sub e} analyses and results, with emphasis on the latter. While the neutrino search excludes the two-neutrino oscillation interpretation of LSND at 98% C.L., the antineutrino search shows an excess of events which is in agreement with the two-neutrino {bar {nu}}{sub {mu}} {yields} {bar {nu}}{sub e} oscillation interpretation of LSND, and excludes the no oscillations hypothesis at 96% C.L. Even though the neutrino and antineutrino oscillation results from MiniBooNE disagree under the single sterile neutrino oscillation hypothesis, a simple extension to the model to include additional sterile neutrino states and the possibility of CP violation allows for differences between neutrino and antineutrino oscillation signatures. In view of that, the viability of oscillation models with one or two sterile neutrinos is investigated in global fits to MiniBooNE and LSND data, with and without constraints from other oscillation experiments with similar sensitivities to those models. A general search for new physics scenarios which would lead to effective non-unitarity of the standard 3 x 3 neutrino mixing matrix, or mixing freedom, is also performed using neutrino and antineutrino data available from MiniBooNE.

Karagiorgi, Georgia S.; /MIT

2010-07-01T23:59:59.000Z

407

Three Affliated Tribes Renewable Energy Feasibility Study  

DOE Green Energy (OSTI)

The Three Affliated Tribes on the Fort Berthold Reservation studied the feasibility of a commercial wind facility on land selected and owned by the Tribes and examined the potential for the development of renewable energy resources on Tribal Lands.

Belvin Pete; Kent Good; Krista Gordon; Ed McCarthy,

2006-05-26T23:59:59.000Z

408

Ductless Heat Pumps "Mini-splits" in PNW Cold and Marine Climates  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pumps "mini-splits" in PNW Pumps "mini-splits" in PNW Cold and Marine Climates David Hales, Michael Lubliner, Luke Howard WSU Energy Program- Olympia, WA Presented at USDOE Building America Meeting Austin, TX - March 2012 Acknowledgments * USDOE BA-PIRC (Eric Martin) * Northwest Energy Efficiency Alliance (David Cohen) * Ecotope Inc. (David Baylon, Ben Larsen, Bob Davis) * The Heat Pump Store (Jeff Pratt) * Bonneville Power Administration (BPA/EPRI) * PNNL (Subrato Chandra) Overview of Presentation * NEEA/BPA funded research - Hales/Ecotope - Utility Billing Analysis - Field Monitoring - HVAC Lab Testing * WSU case study of deep energy retrofit w/DHP - Howard * BA/WSU case study of DHP in HUD-code retrofit - Lubliner

409

A combined muon-neutrino and electron-neutrino oscillation search at MiniBooNE  

SciTech Connect

MiniBooNE seeks to corroborate or refute the unconfirmed oscillation result from the LSND experiment. If correct, the result implies that a new kind of massive neutrino, with no weak interactions, participates in neutrino oscillations. MiniBooNE searches for {nu}{sub {mu}} {yields} {nu}{sub e} oscillations with the Fermi National Accelerator Laboratory 8 GeV beam line, which produces a {nu}{sub {mu}} beam with an average energy of {approx} 0.8 GeV and an intrinsic {nu}{sub e} content of 0.4%. The neutrino detector is a 6.1 m radius sphere filled with CH{sub 2}, viewed by 1540 photo-multiplier tubes, and located 541 m downstream from the source. This work focuses on the estimation of systematic errors associated with the neutrino flux and neutrino interaction cross section predictions, and in particular, on constraining these uncertainties using in-situ MiniBooNE {nu}{sub {mu}} charged current quasielastic (CCQE) scattering data. A data set with {approx} 100,000 events is identified, with 91% CCQE purity. This data set is used to measure several parameters of the CCQE cross section: the axial mass, the Fermi momentum, the binding energy, and the functional dependence of the axial form factor on four-momentum transfer squared. Constraints on the {nu}{sub {mu}} and {nu}{sub e} fluxes are derived using the {nu}{sub {mu}} CCQE data set. A Monte Carlo study of a combined {nu}{sub {mu}} disappearance and {nu}{sub e} appearance oscillation fit is presented, which improves the {nu}{sub {mu}} {yields} {nu}{sub e} oscillation sensitivity of MiniBooNE with respect to a {nu}{sub e} appearance-only fit by 1.2-1.5{sigma}, depending on the value of {Delta}m{sup 2}.

Monroe, Jocelyn R.; /Columbia U.

2006-07-01T23:59:59.000Z

410

Horn OperationalHorn Operational in K2K, MiniBoone,  

E-Print Network (OSTI)

exchange 12G V / 6E12· 12GeV / 6E12 ppp "accessible" (RP) No time/money spent on remote handling design·Design with remote handling in mind ·Foresee full set of spares 04/07/2008 Ans PARDONS, NuFact2008 7 #12;Mini cyclesDesign: 1E7 cycles Remote handling, work cell builtwork cell built 04/07/2008 Ans PARDONS, Nu

McDonald, Kirk

411

Constraints on electromagnetic properties of sterile neutrinos from MiniBooNE results  

E-Print Network (OSTI)

Among the class of models with small mixing angles between sterile and active neutrinos, we place constraints on the effective muon-to-sterile neutrino magnetic and electric dipole transition moments from the combined MiniBooNE results for the sterile neutrino mass range of $10\\;\\mathrm{MeV}distribution as a function of polar angle. However, good agreement with the anomalous event distribution in reconstructed energy can be achieved for some values of magnetic and electric moments.

Alexander Radionov

2013-03-19T23:59:59.000Z

412

Muon Muon Collider: Feasibility Study  

SciTech Connect

A feasibility study is presented of a 2 + 2 TeV muon collider with a luminosity of L = 10{sup 35} cm{sup -2}s{sup -1}. The resulting design is not optimized for performance, and certainly not for cost; however, it does suffice - we believe - to allow us to make a credible case, that a muon collider is a serious possibility for particle physics and, therefore, worthy of R and D support so that the reality of, and interest in, a muon collider can be better assayed. The goal of this support would be to completely assess the physics potential and to evaluate the cost and development of the necessary technology. The muon collider complex consists of components which first produce copious pions, then capture the pions and the resulting muons from their decay; this is followed by an ionization cooling channel to reduce the longitudinal and transverse emittance of the muon beam. The next stage is to accelerate the muons and, finally, inject them into a collider ring wich has a small beta function at the colliding point. This is the first attempt at a point design and it will require further study and optimization. Experimental work will be needed to verify the validity of diverse crucial elements in the design. Muons because of their large mass compared to an electron, do not produce significant synchrotron radiation. As a result there is negligible beamstrahlung and high energy collisions are not limited by this phenomena. In addition, muons can be accelerated in circular devices which will be considerably smaller than two full-energy linacs as required in an e{sup +} - e{sup -} collider. A hadron collider would require a CM energy 5 to 10 times higher than 4 TeV to have an equivalent energy reach. Since the accelerator size is limited by the strength of bending magnets, the hadron collider for the same physics reach would have to be much larger than the muon collider. In addition, muon collisions should be cleaner than hadron collisions. There are many detailed particle reactions which are open to a muon collider and the physics of such reactions - what one learns and the necessary luminosity to see interesting events - are described in detail. Most of the physics accesible to an e{sup +} - e{sup -} collider could be studied in a muon collider. In addition the production of Higgs bosons in the s-channel will allow the measurement of Higgs masses and total widths to high precision; likewise, t{bar t} and W{sup +}W{sup -} threshold studies would yield m{sub t} and m{sub w} to great accuracy. These reactions are at low center of mass energy (if the MSSM is correct) and the luminosity and {Delta}p/p of the beams required for these measurements is detailed in the Physics Chapter. On the other hand, at 2 + 2 TeV, a luminosity of L {approx} 10{sup 35} cm{sup -2}s{sup -1} is desirable for studies such as, the scattering of longitudinal W bosons or the production of heavy scalar particles. Not explored in this work, but worth noting, are the opportunities for muon-proton and muon-heavy ion collisions as well as the enormous richness of such a facility for fixed target physics provided by the intense beams of neutrinos, muons, pions, kaons, antiprotons and spallation neutrons. To see all the interesting physics described herein requires a careful study of the operation of a detector in the very large background. Three sources of background have been identified. The first is from any halo accompanying the muon beams in the collider ring. Very carefully prepared beams will have to be injected and maintained. The second is due to the fact that on average 35% of the muon energy appears in its decay electron. The energy of the electron subsequently is converted into EM showers either from the synchrotron radiation they emit in the collider magnetic field or from direct collision with the surrounding material. The decays that occur as the beams traverse the low beta insert are of particular concern for detector backgrounds. A third source of background is e{sup +} - e{sup -} pair creation from {mu}{sup +} - {mu}{sup -} interaction. Studies of

Gallardo, J.C.; Palmer, R.B.; /Brookhaven; Tollestrup, A.V.; /Fermilab; Sessler, A.M.; /LBL, Berkeley; Skrinsky, A.N.; /Novosibirsk, IYF; Ankenbrandt, C.; Geer, S.; Griffin, J.; Johnstone, C.; Lebrun, P.; McInturff, A.; Mills, Frederick E.; Mokhov, N.; Moretti, A.; Neuffer, D.; Ng, K.Y.; Noble, R.; Novitski, I.; Popovic, M.; Qian, C.; Van Ginneken, A. /Fermilab /Brookhaven /Wisconsin U., Madison /Tel Aviv U. /Indiana U. /UCLA /LBL, Berkeley /SLAC /Argonne /Sobolev IM, Novosibirsk /UC, Davis /Munich, Tech. U. /Virginia U. /KEK, Tsukuba /DESY /Novosibirsk, IYF /Jefferson Lab /Mississippi U. /SUNY, Stony Brook /MIT /Columbia U. /Fairfield U. /UC, Berkeley

2012-04-05T23:59:59.000Z

413

Mini Grid Renewable Energy-Best Practices and Lessons Learnt | Open Energy  

Open Energy Info (EERE)

Mini Grid Renewable Energy-Best Practices and Lessons Learnt Mini Grid Renewable Energy-Best Practices and Lessons Learnt Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Mini Grid Renewable Energy-Best Practices and Lessons Learnt Agency/Company /Organization: World Bank Sector: Energy Focus Area: Renewable Energy Topics: Background analysis Resource Type: Lessons learned/best practices Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, Country: China, Nicaragua Eastern Asia, Central America Coordinates: 12.119424°, -86.264068° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":12.119424,"lon":-86.264068,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

414

Mini Grid Renewable Energy-Economic and Financial Analysis | Open Energy  

Open Energy Info (EERE)

Mini Grid Renewable Energy-Economic and Financial Analysis Mini Grid Renewable Energy-Economic and Financial Analysis Jump to: navigation, search Tool Summary Name: Mini Grid Renewable Energy-Economic and Financial Analysis Agency/Company /Organization: World Bank Sector: Energy Focus Area: Renewable Energy Topics: Finance, Implementation, Market analysis, Background analysis Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, Country: Sri Lanka, Peru Southern Asia, South America Coordinates: 7.873054°, 80.771797° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":7.873054,"lon":80.771797,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

415

Alternative Fuels Data Center: Alternative Fuels Feasibility Study  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuels Alternative Fuels Feasibility Study to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Feasibility Study on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Feasibility Study on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Feasibility Study The North Carolina State Energy Office, Department of Administration,

416

DOE Seeks Industry Proposals for Feasibility Study to Produce...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Seeks Industry Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants DOE Seeks Industry Proposals for Feasibility Study to...

417

DOE Seeks Industry Proposals for Feasibility Study to Produce...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industry Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants DOE Seeks Industry Proposals for Feasibility Study to Produce...

418

Hydropower Technology Roundup Report: Accommodating Wear and Tear Effects on Hydroelectric Facilities Operating to Provide Ancillary Services: TR-113584-V4  

Science Conference Proceedings (OSTI)

Ancillary services are special generation services necessary to maintain both power quality and system integrity. This report aims to provide useful information on accommodating wear and tear of hydropower units when operated to produce ancillary services. The information contained in this report can help hydro plant owners and operators: o better understand wear and tear effects, o devise strategies to mitigate these effects, and o determine the costs associated with wear and tear. This information shou...

2001-08-30T23:59:59.000Z

419

'Mini'-Roadmapping - Ensuring Timely Sites' Cleanup / Closure by Resolving Science and Technology Issues  

Science Conference Proceedings (OSTI)

Roadmapping is a powerful tool to manage technical risks and opportunities associated with complex problems. Roadmapping identifies technical capabilities required for both project- and program-level efforts and provides the basis for plans that ensure the necessary enabling activities will be done when needed. Roadmapping reveals where to focus further development of the path forward by evaluating uncertainties for levels of complexity, impacts, and/or the potential for large payback. Roadmaps can be customized to the application, a graded approach if you will. Some roadmaps are less detailed. We have called these less detailed, top-level roadmaps mini-roadmaps. These miniroadmaps are created to tie the needed enablers (e.g., technologies, decisions, etc.) to the functions. If it is found during the mini-roadmapping that areas of significant risk exist, then those can be roadmapped further to a lower level of detail. Otherwise, the mini-roadmap may be sufficient to manage the project / program risk. Applying a graded approach to the roadmapping can help keep the costs down. Experience has indicated that it is best to do mini-roadmapping first and then evaluate the risky areas to determine whether to further evaluate those areas. Roadmapping can be especially useful for programs / projects that have participants from multiple sites, programs, or other entities which are involved. Increased synergy, better communications, and increased cooperation are the results from roadmapping a program / project with these conditions. And, as with any trip, the earlier you use a roadmap, the more confidence you will have that you will arrive at your destination with few, if any, problems. The longer the trip or complicated the route, the sooner the map is needed. This analogy holds true for using roadmapping for laying out program / project baselines and any alternative (contingency) plans. The mini-roadmapping process has been applied to past projects like the hydrogen gas generation roadmap and the subsurface contaminant focus area (SCFA), and its basic form is being applied in the formulation of the 2012 Plan at the Idaho National Engineering and Environmental Laboratory (INEEL). There are also plans to apply this process in the near future for other projects/programs.

Dale Luke; James Murphy

2003-02-01T23:59:59.000Z

420

Northern New Mexico regional airport market feasibility  

SciTech Connect

This report is about the market for airline travel in northern New Mexico. Interest in developing a northern New Mexico regional airport has periodically surfaced for a number of years. The New Mexico State Legislature passed a memorial during the 1998 Second Session calling for the conduct of a study to determine the feasibility of building a new regional airport in NNM. This report is a study of the passenger market feasibility of such an airport. In addition to commercial passenger market feasibility, there are other feasibility issues dealing with siting, environmental impact, noise, economic impact, intermodal transportation integration, region-wide transportation services, airport engineering requirements, and others. These other feasibility issues are not analyzed in any depth in this report although none were discovered to be show-stoppers as a by-product of the authors doing research on the passenger market itself. Preceding the need for a detailed study of these other issues is the determination of the basic market need for an airport with regular commercial airline service in the first place. This report is restricted to an in-depth look at the market for commercial passenger air service in NNM. 20 figs., 8 tabs.

Drake, R.H.; Williams, D.S.

1998-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Methane Hydrate Production Feasibility | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Production Feasibility Production Feasibility Methane Hydrate Production Feasibility The red curves are temperature profiles for various water depths; the blue line shows methane hydrate stability relative to temperature and pressure. The area enclosed by the two curves represents the area of methane hydrate stability. The red curves are temperature profiles for various water depths; the blue line shows methane hydrate stability relative to temperature and pressure. The area enclosed by the two curves represents the area of methane hydrate stability. Methane, the predominant component of natural gas, forms hydrate in the presence of water, low temperatures and high pressures. Alternatively, when the temperature is increased or the pressure decreased so that hydrates are outside their stability field, they dissociate into methane and water.

422

Geothermal feasibility study for Malting Investments Inc  

SciTech Connect

The engineering feasibility of using geothermal heat in the kilning, germination, and steep water cooling processes for a malting facility is determined. The study is based upon a malting facility with an annual capacity of malting three million bushels of clean graded barley per year or 8220 bushels per day. Capital cost figures used in the feasibility study are budget prices for the basic equipment only, they do not include any other costs such as installation, instrumentation or design and engineering costs. Utility prices are based upon $0.03 per kilowatt hour and $0.4548 per therm for natural gas.

1981-10-01T23:59:59.000Z

423

Laboratory Test Report for Fujitsu 12RLS and Mitsubishi FE12NA Mini-Split Heat Pumps  

Science Conference Proceedings (OSTI)

Mini-split heat pumps are being proposed as a new retrofit option to replace resistance heating in the Pacific Northwest. NREL has previously developed a field test protocol for mini-split systems to ensure consistent results from field tests. This report focuses on the development of detailed system performance maps for mini-split heat pumps so that the potential benefits of mini-split systems can be accurately analyzed for different climate regions and housing types. This report presents laboratory test results for two mini-split heat pumps. Steady-state heating and cooling performance for the Fujitsu 12RLS and Mitsubishi FE12NA was tested under a wide range of outdoor and indoor temperatures at various compressor and fan speeds. Cycling performance for each unit was also tested under both modes of operation. Both systems performed quite well under low loads and the experimental test data aligned with manufacturer reported values. Adequate datasets were attained to promote performance modeling of these two systems in the future.

Winkler, J.

2011-09-01T23:59:59.000Z

424

Tuttle Creek Hydroelectric Project feasibility assessment report  

DOE Green Energy (OSTI)

The results are presented of a feasibility assessment study to determine if hydroelectric generation could be developed economically at the Corps of Engineers' Tuttle Creek Dam, an existing flood control structure on the Big Blue River near Manhattan, Kansas. The studies and investigations included site reconnaissance, system load characteristics, site hydrology, conceptual project arrangements and layouts, power studies, estimates of construction costs, development of capital costs, economic feasibility, development of a design and construction schedule and preliminary environmental review of the proposed Project. The dependable capacity of the Project as delivered into the existing transmission and distribution network is 12,290 kW and the average annual energy is 56,690 MWh. For the scheduled on-line date of July 1984, the Project is estimated to have a Total Investment Cost of $19,662,000 (equal to $1333/kW installed at that time frame) with an estimated annual cost for the first year of operation of $2,696,000, assuming REA financing at 9.5% interest rate. The Project is considered technically feasible and without any major environmental issues. It shows economic feasibility providing satisfactory financing terms are available. (LCL)

None

1979-03-01T23:59:59.000Z

425

A cask maintenance facility feasibility study  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

426

An Assessment of the Feasibility of Emergency  

E-Print Network (OSTI)

An Assessment of the Feasibility of Emergency Electrical Generation Units to Serve System Load the past year a growing power crisis has emerged across the western states. Recent developments in power of emergency generators, already installed in a variety of buildings, be used to increase power generation

427

Quantifying Stove Emissions Related to Different Use Patterns for the Silver-mini  

NLE Websites -- All DOE Office Websites (Extended Search)

Quantifying Stove Emissions Related to Quantifying Stove Emissions Related to Different Use Patterns for the Silver-mini (Small Turkish) Space Heating Stove Randy Maddalena, Melissa Lunden, Daniel Wilson, Cristina Ceballos, Thomas Kirchstetter, Jonathan Slack, Larry Dale Environmental Energy Technologies Division Indoor Environment Group Lawrence Berkeley National Laboratory Berkeley, CA 94720 August 2012 This work was supported by the Millennium Challenge Corporation, USA and by the U.S. Department of Energy under Contract No. DE-AC02-05CH11231. LBNL-6319E Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither

428

Horn Operational Experience in K2K, MiniBooNE, NuMI and CNGS  

E-Print Network (OSTI)

This paper gives an overview of the operation and experience gained in the running of magnetic horns in conventional neutrino beam lines (K2K, MiniBooNE, NuMI and CNGS) over the last decade. Increasing beam power puts higher demands on horn conductors but even more on their hydraulic and electrical systems, while the horn environment itself becomes more hostile due to radiation. Experience shows that designing horns for remote handling and testing them extensively without beam become prerequisites for successful future neutrino beam lines.

Pardons, A

2008-01-01T23:59:59.000Z

429

NREL Documents Efficiency of Mini-Split Heat Pumps (Fact Sheet)  

DOE Green Energy (OSTI)

A new report delivers mini-split heat pump (MSHP) performance data for use in whole-building simulation tools. Mini-split heat pumps (MSHPs) are highly efficient refrigerant-based air conditioning and heating systems that permit room-by-room conditioning and control in homes. Because of their size, efficiency, and price, MSHPs are very popular overseas and are gaining market share in energy-efficient home upgrades in the United States. They are a good option for retrofitting older homes that lack ductwork. To evaluate MSHP cost effectiveness and performance in U.S. homes, National Renewable Energy Laboratory (NREL) researchers are studying these systems in the laboratory, simulated buildings, and field test settings. A new NREL report describes an innovative laboratory approach to testing MSHPs and includes experimental performance maps for use in whole-building simulation tools. Most public information on MSHP performance is provided by equipment manufacturers, and is typically limited to performance at a single operating speed for heating and cooling. Mini-split heat pumps use variable speed components that spin up and down to continuously meet the heating or cooling need, significantly improving a system's operating efficiency. Measuring that efficiency in a laboratory is challenging and required new approaches to performance testing. NREL researchers worked with colleagues at Purdue University's Herrick Labs and Ecotope, Inc. to refine and apply this new approach to a suite of MSHP products. Researchers measured the performance of two MSHPs across a variety of operating conditions, which allowed, for the first time, development of accurate building simulation MSHP models. In the laboratory tests, researchers found that both MSHPs achieved manufacturer-reported performance at rating conditions. However, at other temperature and humidity conditions, the heat pumps capacity ranged from 40% above to 54% below the manufacturer-reported values. Knowing how performance varies is critical in order to reasonably estimate annual energy consumption of a MSHP, and to compare MSHPs to other heating and cooling options. Mini-split heat pump efficiency (COP) was seen to significantly exceed rated efficiency at low compressor speeds-a very important effect.

Not Available

2012-06-01T23:59:59.000Z

430

Idaho National Laboratory - Hydropower Program- Virtual Hydropower...  

NLE Websites -- All DOE Office Websites (Extended Search)

pop-up blockers that you are using. Thank you Different BrowsersPop-up Blockers: Google Toolbar Internet Explorer Mozilla FireFox Netscape Explorer Opera Browser Safari...

431

Feasibility study of networks. Progress report, July 15, 1975--July 14, 1976  

SciTech Connect

The Laboratory for Nuclear Science has continued its study into the feasibility of networks, changing the focus of the investigation from the possible ways of collaborating with the MIT Information Processing Center in implementing a connection to the ARPA net to a wider consideration of the implications of computer resource sharing via networks. This report describes experiments performed on the ARPA net in collaboration with the Lawrence Berkeley Laboratory and experiments in more conventional forms of remote job entry to that site and others in ERDA. It discusses the use of the Multics mail as set up for ERDA, comparing it to other mail systems. Plans for future experiments in the ARPA net and for investigation of networks other than the ARPA net are proposed. The conclusion was reached that resource sharing via networks is both feasible and desirable provided certain interface problems are solved. Recommendations are made for more investigation into the human factors involved in network use, methods of providing consulting help to users, and determination of the most cost effective use of remote resource sharing. For the Laboratory for Nuclear Science, it is concluded that access to other ERDA computers via networks will meet some of our computing needs now and more in the future. However, remote resource sharing can be used only to supplement the on site computer, not replace it. At the present time, the best method of accessing the ARPA net for our users is via the MIT Multics System. However, as a permanent solution, a mini-host located in our computer center may provide more capability. In the next year, we plan to work out methods of attacking the problems of interfacing to the ARPA net and to use it in a limited manner for actual production work.

Campbell, E.J.; Kannel, M.; Saffran, K.

1976-04-30T23:59:59.000Z

432

GEEF: a geothermal engineering and economic feasibility model. Description and user's manual  

DOE Green Energy (OSTI)

The model is designed to enable decision makers to compare the economics of geothermal projects with the economics of alternative energy systems at an early stage in the decision process. The geothermal engineering and economic feasibility computer model (GEEF) is written in FORTRAN IV language and can be run on a mainframe or a mini-computer system. An abbreviated version of the model is being developed for usage in conjunction with a programmable desk calculator. The GEEF model has two main segments, namely (i) the engineering design/cost segment and (ii) the economic analysis segment. In the engineering segment, the model determines the numbers of production and injection wells, heat exchanger design, operating parameters for the system, requirement of supplementary system (to augment the working fluid temperature if the resource temperature is not sufficiently high), and the fluid flow rates. The model can handle single stage systems as well as two stage cascaded systems in which the second stage may involve a space heating application after a process heat application in the first stage.

Not Available

1982-09-01T23:59:59.000Z

433

Tough Stuff: A Look Back at NOVA's "Making Stuff" Mini-Series | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tough Stuff: A Look Back at NOVA's "Making Stuff" Mini-Series Tough Stuff: A Look Back at NOVA's "Making Stuff" Mini-Series Tough Stuff: A Look Back at NOVA's "Making Stuff" Mini-Series January 21, 2011 - 12:12pm Addthis Charles Rousseaux Charles Rousseaux Senior Writer, Office of Science What are the key facts? Scientists at the Lawrence Berkeley National Lab imitated the structure of mother of pearl to create the toughest ceramic ever produced and recently helped to develop a new type of damage-tolerant metallic glass that's stronger and tougher than steel. Researchers at Oak Ridge National Laboratory developed a new 'super' stainless steel alloy that tolerates heat and resists rust far better than other metals -- and steel that can stand up to the blazing heat produced by stars. PBS' NOVA kicked off a four-part series, partially funded by the

434

Experiments in a single-phase natural circulation mini-loop  

SciTech Connect

This study reports an experimental investigation related to a rectangular single-phase natural circulation mini-loop, which consists of two horizontal copper tubes (heat transfer sections) and two vertical tubes (legs) made of copper, connected by means of four glass 90 bends. The loop inner diameter is 4 mm. The lower heating section consists of an electrical heating wire made of nicromel on the outside of the copper tube; the upper cooling system consists of a coaxial cylindrical heat exchanger with a water-glycol mixture, set at controlled temperature and flowing through the annulus. The loop has an imposed heat flux in the lower heating section and an imposed temperature in the cooler. The mini-loop was placed onto a table which can assume different inclinations. The parameters investigated during the experiments were: power transferred to the fluid and inclination of the loop. The preliminary results show a stable behaviour with a steady temperature difference across the heat sinks. It has been confirmed that the fluid velocity is very small (order of millimetres per second). (author)

Misale, M.; Garibaldi, P. [Dipartimento di Ingegneria della Produzione, Termoenergetica e Modelli Matematici DIPTEM-Tec, University of Genoa, Via All'Opera Pia, 15-a (I) 16145 Genova (Italy); Passos, J.C.; de Bitencourt, G. Ghisi [Universidade Federal de Santa Catarina, Departamento de Engenharia Mecanica, LEPTEN/Boiling - Laboratorios de Engenharia de Processos e Tecnologia de Energia, Boiling Group EMC - Caixa Postal 476, CEP 88040-900, Florianopolis, SC (Brazil)

2007-08-15T23:59:59.000Z

435

Technical Analysis of Hydrogen Production: Evaluation of H2 Mini-Grids  

SciTech Connect

We have assessed the transportation of hydrogen as a metal hydride slurry through pipelines over a short distance from a neighborhood hydrogen production facility to local points of use. The assessment was conducted in the context of a hydrogen "mini-grid" serving both vehicle fueling and stationary fuel cell power systems for local building heat and power. The concept was compared to a compressed gaseous hydrogen mini-grid option and to a stand-alone hydrogen fueling station. Based on our analysis results we have concluded that the metal hydride slurry concept has potential to provide significant reductions in overall energy use compared to liquid or chemical hydride delivery, but only modest reductions in overall energy use, hydrogen cost, and GHG emissions compared to a compressed gaseous hydrogen delivery. However, given the inherent (and perceived) safety and reasonable cost/efficiency of the metal hydride slurry systems, additional research and analysis is warranted. The concept could potentially overcome the public acceptance barrier associated with the perceptions about hydrogen delivery (including liquid hydrogen tanker trucks and high-pressure gaseous hydrogen pipelines or tube trailers) and facilitate the development of a near-term hydrogen infrastructure.

Lasher, Stephen; Sinha, Jayanti

2005-05-03T23:59:59.000Z

436

New Results from MiniBooNE Charged-Current Quasi-Elastic Anti-Neutrino Data  

SciTech Connect

MiniBooNE anti-neutrino charged-current quasi-elastic (CCQE) data is compared to model predictions. The main background of neutrino-induced events is examined first, where three independent techniques are employed. Results indicate the neutrino flux is consistent with a uniform reduction of {approx}20% relative to the largely uncertain prediction. After background subtraction, the Q{sup 2} shape of {bar v}{sub {mu}} CCQE events is consistent with the model parameter MA = 1.35 GeV determined from MiniBooNE v{sub {mu}} CCQE data, while the normalization is {approx} 20% high compared to the same prediction.

Grange, Joseph

2011-07-01T23:59:59.000Z

437

Central Station DHC Phase 1 feasibility  

SciTech Connect

This project assisted a private real estate developer in technically assessing the feasibility of integrating a central DHC system into a proposed 72 acre area mixed-use Planned Development (Central Station) just south of the Chicago Central Business District (Loop). The technical assessment concluded that a district heating and cooling system for Central Station will be feasible, provided that a major anchor load can be connected to the system. The system conceived for the site employs a modular approach that adjusts production capacity to actual load growth. The design concept includes gas-fired boilers for heating, gas turbine driven chillers for base loading, electric motor driven chillers for peaking, steam turbines for peak power and back pressure operation, and chilled water storage. Energy will be supplied to the users in the form of steam or low temperature hot water for heating, and low temperature chilled water for cooling.

Henderson, H.L.

1992-03-01T23:59:59.000Z

438

Construction feasibility of OTEC platforms. Final report  

DOE Green Energy (OSTI)

This study provides an evaluation of the feasibility of constructing either steel or concrete OTEC platforms of both spar and ship shape configurations for a range of platform sizes with respect to existing, developed shipyard or fabrication yard facilities that are currently active in marine vessel construction within the US. This brief study is quite broad in scope. Many parameters, including plant size; vessel type, size, configuration, and dimensions; position of heat exchangers; existing construction facility size, geographic location, and potential for modification; and, availability of undeveloped deep water construction sites affect the conclusions drawn. Nevertheless, the conclusions should remain valid and not change significantly, unless there are major changes in either vessel size or US construction capabilities. The various concepts are ranked in order of their feasibility and practicality of construction in existing or modified existing facilities and new facilities.

Brewer, J H; Harwood, P; Solberg, K; Fjeld, S

1978-12-01T23:59:59.000Z

439

1980 Base case and feasibility analysis  

SciTech Connect

This report describes a task of documenting a base case'' and performing a feasibility analysis for a national residential energy efficiency program for new homes, The principal objective of the task wasto estimate the energy consumption of typical homes built in 1980 and then to identify and assess the feasibility of methods to reduce that consumption by 50%. The goal of the program by the year 2000 is to reduce heating and cooling energy use in new homes built under the program to one-half of the energy use in typical new homes built in 1980. The task also calls for determining whether the program goal should be revised, based on the analysis.

1993-03-01T23:59:59.000Z

440

1980 Base case and feasibility analysis  

SciTech Connect

This report describes a task of documenting a ``base case`` and performing a feasibility analysis for a national residential energy efficiency program for new homes, The principal objective of the task wasto estimate the energy consumption of typical homes built in 1980 and then to identify and assess the feasibility of methods to reduce that consumption by 50%. The goal of the program by the year 2000 is to reduce heating and cooling energy use in new homes built under the program to one-half of the energy use in typical new homes built in 1980. The task also calls for determining whether the program goal should be revised, based on the analysis.

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Potential effects of four Flaming Gorge Dam hydropower operational scenarios on the fishes of the Green River, Utah and Colorado  

DOE Green Energy (OSTI)

Aerial videography and modeling were used to evaluate the impacts of four hydropower operational scenarios at Flaming Gorge Dam, Utah, on trout and native fishes in the Green River, Utah and Colorado. The four operational scenarios studied were year-round high fluctuations, seasonally adjusted high fluctuations, seasonally adjusted moderate fluctuations, and seasonally adjusted steady flows. Impacts on trout were evaluated by examining differences among scenarios in the areas of inundated substrates that serve as spawning and feeding habitat. All scenarios would provide at least 23 acres per mile of habitat for spawning and food production; seasonally adjusted operations would provide additional areas during periods of sustained high release. Seasonally adjusted high fluctuations would increase inundated areas by 12 to 26% for a short period in winter and spring, but food production and reproduction would not be expected to increase. Seasonally adjusted moderate fluctuations and steady flows would produce similar increases in area, but the longer period of inundation could also result in increased food production and provide additional spawning sites for trout. Impacts on native fishes were assessed by examining daily changes in backwater nursery areas. Compared with year-round high fluctuations, the daily changes in backwater area would decrease by about 47, 89, and 100% under the seasonally adjusted high fluctuation, moderate fluctuation, and steady flow scenarios, respectively. Similarly, daily stage fluctuations during the nursery period would decrease by 72, 89, and 100% under the seasonally adjusted high fluctuation, moderate fluctuation, and steady flow scenarios, respectively. These reductions in daily fluctuations in backwater area and stage would improve conditions in nursery habitats and could in turn improve recruitment and overwinter survival. Introduced fish species could also benefit from the seasonally adjusted operational scenarios.

Hlohowskyj, I.; Hayse, J.W.

1995-09-01T23:59:59.000Z

442

Substation Bus Ampacity Uprating: Feasibility Study  

Science Conference Proceedings (OSTI)

The continuous increase in demand for electric power has pushed some of the components in the Con Edison system to their design limits. These limits, established in the past, were often selected with general and conservative assumptions. Consequently, Con Edison requested the Electric Power Research Institute (EPRI) to investigate the possibility of raising the rating of their 3,000A substation bus to a higher value.The first step in the investigation was to conduct a feasibility study ...

2013-04-24T23:59:59.000Z

443

B Plant process piping replacement feasibility study  

SciTech Connect

Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

Howden, G.F.

1996-02-07T23:59:59.000Z

444

Gasohol: economic feasibility study. Final report  

DOE Green Energy (OSTI)

This report was prepared by Development Planning and Research Associates, Inc. under a contract with the Energy Research and Development Center of the University of Nebraska in cooperation with the Agricultural Products Industrial Utilization Committee and the State of Nebraska. Funding for this study was provided to the Energy Research and Development Center by the U.S. Department of Energy and the Old West Regional Commission. The primary objective of the study was to: determine the fiscal and market conditions under which the production of gasohol would be profitable for private producers. For purposes of this study, gasohol is a motor fuel consisting of 10 percent agriculturally-derived anhydrous ethanol and 90 percent unleaded gasoline. The study assumes that gasohol can be a fuel substitute for gasoline; indeed, the cost of gasoline will significantly influence that for gasohol. Gasoline prices are determined by factors external to ethanol; thus, the economic feasibility study of gasohol is in large part an economic feasibility study of fuel-grade ethanol production. More specifically, the study examined the following: the technical aspects of distributing, marketing, and using gasohol; the costs of the distribution and marketing of ethanol and gasohol; the energy balance of ethanol production; the cost of producing ethanol; the factors influencing ehtanol plant size and location; and the conditions that would make ethanol economicaly feasible for private producers.

David, M. L.; Hammaker, G. S.; Buzenberg, R. J.; Wagner, J. P.

1978-07-01T23:59:59.000Z

445

Feasibility studies of aquifer thermal energy storage  

DOE Green Energy (OSTI)

Determining the feasibility of using aquifer thermal energy storage (ATES) for a particular heating or cooling application is an interdisciplinary effort, requiring (at a minimum) expertise in engineering and hydrology. The feasibility study should proceed in two distinct stages. The first stage, which is limited in scope and detail, is intended to show if an ATES system is technically and economically suited to the application. Focus of this preliminary investigation is on revealing the existence of factors that might weigh heavily against the use of ATES methods, and, in the absence of such factors, on choosing a suitable scale for the ATES plant and well field. The results of the preliminary investigation are used to determine if more detailed investigation--including field studies--are justified, and to facilitate comparing the advantages of ATES to those of other means of providing heating or cooling. The second stage of the feasibility study focuses on detailed aquifer characterization, refinement of engineering design and cost estimates, and economic and environmental risk analysis. The results of this investigation, if favorable, will be used to justify the expense of constructing the ATES system.

Hall, S H

1993-01-01T23:59:59.000Z

446

Feasibility of Magnetostrictive Sensor Inspection of Containments  

SciTech Connect

This report describes the results of a study on the feasibility of using guided waves for long-range global inspection of containment metallic pressure boundaries (i.e., steel containments and liners of reinforced concrete containments) in nuclear power plants. Of particular concern in this study was the potential of the guided-wave approach for remotely inspecting the regions that are inaccessible; for example, regions where the metallic pressure boundary is backed by concrete on one or both sides. The study includes a literature review on long-range guided-wave inspection techniques, a modeling study of the behavior of guided waves in plates with different boundary conditions (e.g., freestanding and backed by concrete on one or both sides), and an experimental investigation of the feasibility of a guided-wave technique called ''magnetostrictive sensor (MsS)'' for (1) generating and detecting guided waves in plates and (2) detecting a defect over a long range. Results of the study showed (1) that it is feasible to achieve long-range global inspection of plates, including regions that are inaccessible, using low-frequency guided waves and (2) that the MsS technique is well suited for this application. Recommendations are made to further test and develop the MsS technique for practical implementation for containment inspection in nuclear power plants.

Kwun, H.

1999-03-01T23:59:59.000Z

447

Scoping Study to Evaluate Feasibility of National Databases for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings: Appendices Scoping Study to Evaluate Feasibility of National Databases for EM&V...

448

NREL: Technology Transfer - Study Shows Feasibility of High Wind ...  

National Renewable Energy Laboratory Technology Transfer Study Shows Feasibility of High Wind Penetrations in Southwest Power Pool March 15, 2010

449

Using MiniBooNE neutral current elastic cross section results to constrain 3+1 sterile neutrino models  

E-Print Network (OSTI)

The MiniBooNE Neutral Current Elastic (NCEL) cross section results are used to extract limits in the $\\Delta m^{2}-\\sin^{2}\\vartheta_{\\mu s}$ plane for a 3+1 sterile neutrino model with a mass splitting $0.1 \\leq \\Delta m^{2} \\leq 10.0$ eV$^{2}$. GENIE is used with a cross section model close to the one employed by MiniBooNE to make event rate predictions using simulations on the MiniBooNE target material CH$_{2}$. The axial mass is a free parameter in all fits. Sterile modifications to the flux and changes to the cross section in the simulation relate the two and allow limits to be set on sterile neutrino mixing using cross section results. The large axial mass problem makes it necessary for experiments to perform their own axial mass fits, but a prior fit to the same dataset could mask a sterile oscillation signal. Results are given with and without a penalty term on the axial mass from a prior fit. We find that a simultaneous fit to the axial mass and the sterile neutrino parameters favours very high axial mass values. The general problems that the current uncertainty on charged-current quasi-elastic (CCQE) cross sections at MiniBooNE energies pose for sterile neutrino measurements are discussed.

Callum Wilkinson; Susan Cartwright; Lee Thompson

2013-09-04T23:59:59.000Z

450

The Extended GMRT Radio Halo Survey I: New upper limits on radio halos and mini-halos  

E-Print Network (OSTI)

A fraction of galaxy clusters host diffuse radio sources called radio halos, radio relics and mini-halos. We present the sample and first results from the Extended GMRT Radio Halo Survey (EGRHS)- an extension of the GMRT Radio Halo Survey (GRHS, Venturi et al. 2007, 2008). It is a systematic radio survey of galaxy clusters selected from the REFLEX and eBCS X-ray catalogs . Analysis of GMRT data at 610/ 235/ 325 MHz on 12 galaxy clusters are presented. We report the detection of a newly discovered mini-halo in the cluster RXJ1532.9+3021 at 610 MHz. A small scale relic (~200 kpc) is suspected in the cluster Z348. We do not detect cluster-scale diffuse emission in 11 clusters. Robust upper limits on the detection of radio halo of size of 1 Mpc are determined. We also present upper limits on the detections of mini-halos in a sub-sample of cool-core clusters. The upper limits for radio halos and mini-halos are plotted in the radio power- X-ray luminosity plane and the correlations are discussed. Diffuse extended e...

Kale, R; Giacintucci, S; Dallacasa, D; Cassano, R; Brunetti, G; Macario, G; Athreya, R

2013-01-01T23:59:59.000Z

451

Strength and Lifetime Analysis of SMT Solder Joints: An Exemplary Study of the MiniMELF Component  

E-Print Network (OSTI)

-linear three-dimensional finite element (FE) analysis of the thermally loaded struc- ture. In the present case by using the CAD software I-DEAS [2]. To allow for a swift and reliable stress / strain analysis including626 Strength and Lifetime Analysis of SMT Solder Joints: An Exemplary Study of the Mini

Berlin,Technische Universität

452

FEASIBILITY OF SOLAR-FIRED, COMPRESSOR-ASSISTED  

E-Print Network (OSTI)

FEASIBILITY OF SOLAR-FIRED, COMPRESSOR-ASSISTED ABSORPTION CHILLERS Prepared For: California Energy REPORT (FAR) FEASIBILITY OF SOLAR FIRED, COMPRESSOR ASSISTED ABSORPTION CHILLERS EISG AWARDEE Bergquam 1 Feasibility Of Solar Fired, Compressor Assisted Absorption Chillers EISG Grant # 99-15 Awardee

453

Feasibility analysis of recycling radioactive scrap steel  

SciTech Connect

The purpose of this study is to: (1) establish a conceptual design that integrates commercial steel mill technology with radioactive scrap metal (RSM) processing to produce carbon and stainless steel sheet and plate at a grade suitable for fabricating into radioactive waste containers; (2) determine the economic feasibility of building a micro-mill in the Western US to process 30,000 tons of RSM per year from both DOE and the nuclear utilities; and (3) provide recommendations for implementation. For purposes of defining the project, it is divided into phases: economic feasibility and conceptual design; preliminary design; detail design; construction; and operation. This study comprises the bulk of Phase 1. It is divided into four sections. Section 1 provides the reader with a complete overview extracting pertinent data, recommendations and conclusions from the remainder of the report. Section 2 defines the variables that impact the design requirements. These data form the baseline to create a preliminary conceptual design that is technically sound, economically viable, and capitalizes on economies of scale. Priorities governing the design activities are: (1) minimizing worker exposure to radionuclide hazards, (2) maximizing worker safety, (3) minimizing environmental contamination, (4) minimizing secondary wastes, and (5) establishing engineering controls to insure that the plant will be granted a license in the state selected for operation. Section 3 provides details of the preliminary conceptual design that was selected. The cost of project construction is estimated and the personnel needed to support the steel-making operation and radiological and environmental control are identified. Section 4 identifies the operational costs and supports the economic feasibility analysis. A detailed discussion of the resulting conclusions and recommendations is included in this section.

Nichols, F. [Manufacturing Sciences Corp., Woodland, WA (United States); Balhiser, B. [MSE, Inc., Butte, MT (United States); Cignetti, N. [Cignetti Associates, North Canton, OH (United States)] [and others

1995-09-01T23:59:59.000Z

454

The feasibility of ethanol production in Texas  

E-Print Network (OSTI)

Agricultural interests across Texas are looking at the possibility of an ethanol industry in Texas. Continued conflict in the Middle East, the ban of methyl tertiary butyl ether (MTBE) in California, and low commodity prices have all lead to increased interest in ethanol throughout the state of Texas. There have been several ethanol feasibility studies conducted. Most studies have been focused in other states, and only one incorporated risk on input and output prices. Very little research has been done in Texas. Previous studies are typically for a generic location and only looked at ethanol production from corn. This study looks at four different plant sizes in three different regions using corn and grain sorghum. This study incorporates risk on input prices (corn, grain sorghum, natural gas, and electricity) and the output prices of ethanol and dried distillers grain with solubles (DDGS). The regions that were analyzed in the study are the Texas Panhandle, the Central Texas region, and the Southeast Texas region. The results indicate that the only plants expected to generate a positive net present value (NPV) were the larger grain sorghum based plants in the Texas Panhandle. The smaller sorghum based plants in the Panhandle did not have a positive NPV. The only other plants that were close to having a positive net present value were the grain sorghum plants in the Central Texas Region. Sorghum in the Southeast Texas Region was not feasible. Using corn as the feedstock was not as feasible in any region. The results of a sensitivity analysis show that a small increase in the net income in the form of increased revenue or reduced costs would make all the plants profitable.

Herbst, Brian Keith

2003-01-01T23:59:59.000Z

455

Further development of the pneumatic method to harness hydropower and its experimental implementation in the State of Maine. Final report, [February 15, 1990--February 14, 1993  

DOE Green Energy (OSTI)

This report contains conclusive results of the research project entitled ``Further Development of the Pneumatic Method to Harness Hydropower and its Experimental Implementation in the State of Maine`` sponsored by the US Department of Energy (Contract DE-FG02-91ER12113). The results obtained by this research are considerably beyond the original goals anticipated by the contract which were a theoretical study of the method only and its possible applications. In fact, the success of the analytical research program has allowed us to move on to development, construction and testing of a physical model of the hydro-air power converter and, subsequently, to development of a well equipped hydro-pneumatic power laboratory at Northeastern University. Photographs la and 2a show both the laboratory and the model. Good performance of the model proves that the hydro-pneumatic concept holds much promise for development of an ecologically safe and commercially attractive novel approach to harnessing ultra low-head hydropower. As a result, private companies have started to support this new technology, and to invest money in its further development and construction of demonstration power plants (Appendix 1). Visitors at the Northeastern University laboratory often praise this new technique, as is attested by the articles in the Wall Street Journal (Appendix 2) and the Technology Review (Appendix 3).

Gorlov, A.M.

1994-03-01T23:59:59.000Z

456

Summary of the LARP Mini-Workshop on Beam-Beam Compensation 2007  

SciTech Connect

The LARP Mini-Workshop on Beam-Beam Compensation 2007 was held at SLAC, 2-4 July 2007. It was attended by 33 participants from 10 institutions in Asia, Europe, and America. 26 presentations were given, while more than one third of the time was allocated to discussions. The workshop web site is Ref. [1]. The workshop's main focus was on long-range and head-on beam-beam compensation, with a view towards application in the LHC. Other topics included the beam-beam performance of previous, existing and future circular colliders; beam-beam simulations; new operating modes, theory, and unexplained phenomena. This summary is also published as Ref. [2].

Fischer, Wolfram; /Brookhaven; Bruning, Oliver S.; Koutchouk, J.P.; Zimmermann, F.; /CERN; Sen, T.; Shiltsev, V.; /Fermilab; Ohmi, K.; /KEK, Tsukuba; Furman, M.; /LBL, Berkeley; Cai, Y.; Chao, A.; /SLAC

2011-11-07T23:59:59.000Z

457

Research on Convective Heat Transfer and Mass Transfer of the Evaporator in Micro/Mini-Channel  

E-Print Network (OSTI)

With the development of science and technology, various heating and cooling equipment have a development trend of micromation. Micro-fabrication processes make it possible to conduct research on condensation heat transfer in micro-channels. Based on the reviewers on the present household air conditioners, the potential requirements for new heat transfer enhancement used for household air conditioners are discussed. Investigations on condensation and boiling of refrigerants in mini/micro channels have indicated that the evaporator and condenser of air conditioner would be more efficient and more compact by using microchannels, and hence it could improve the coefficient of performance of air conditioners to meet the new energy conversion standards in China. The relationship between condensation heat transfer of refrigerants and surface physical characteristics of the evaporator are pointed out and analyzed in order to achieving the corresponding heat transfer coefficients.

Su, J.; Li, J.

2006-01-01T23:59:59.000Z

458

Jackson Bluff Hydroelectric Project. Feasibility assessment report  

DOE Green Energy (OSTI)

A feasibility assessment study was conducted to determine if it is economical to reinstall hydroelectric generating units at the existing Jackson Bluff Dam on the Ochlockonee River in Florida. The studies and investigations have included site reconnaissance, system loads, growth rate, site hydrology, conceptual project arrangements and layouts, power output, estimates of construction costs and annual costs, economic analyses, development of a design and construction schedule and a preliminary environmental review of the proposed Project. It was concluded that the Project poses no unusual technical problems and no significant adverse environmental effects are anticipated. It shows sufficient promise of technical, economic and financial feasibility, to justify the City entering into the next phase of work, the FERC License Application, as soon as possible. The site can be restored for an investment of $9.9 to $10.4 million to establish 8.8 MW of capacity and produce 24,920 MWh of electrical energy annually, and in 10 years would save over $4 million as compared with current fuel costs for operating an oil-fueled power plant. (LCL)

Not Available

1979-03-01T23:59:59.000Z

459

Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Feasibility  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Natural Gas Vehicle Natural Gas Vehicle (NGV) Feasibility Evaluation to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Feasibility Evaluation on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Feasibility Evaluation on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Feasibility Evaluation on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Feasibility Evaluation on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Feasibility Evaluation on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle (NGV) Feasibility Evaluation on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

460

Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Miles Traveled Vehicle Miles Traveled Tax Feasibility Evaluation to someone by E-mail Share Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Facebook Tweet about Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Twitter Bookmark Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Google Bookmark Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Delicious Rank Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Digg Find More places to share Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

Note: This page contains sample records for the topic "mini hydropower feasibility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Aleutian Pribilof Islands Wind Energy Feasibility Study  

DOE Green Energy (OSTI)

Under this project, the Aleutian Pribilof Islands Association (APIA) conducted wind feasibility studies for Adak, False Pass, Nikolski, Sand Point and St. George. The DOE funds were also be used to continue APIA's role as project coordinator, to expand the communication network quality between all participants and with other wind interest groups in the state and to provide continued education and training opportunities for regional participants. This DOE project began 09/01/2005. We completed the economic and technical feasibility studies for Adak. These were funded by the Alaska Energy Authority. Both wind and hydro appear to be viable renewable energy options for Adak. In False Pass the wind resource is generally good but the site has high turbulence. This would require special care with turbine selection and operations. False Pass may be more suitable for a tidal project. APIA is funded to complete a False Pass tidal feasibility study in 2012. Nikolski has superb potential for wind power development with Class 7 wind power density, moderate wind shear, bi-directional winds and low turbulence. APIA secured nearly $1M from the United States Department of Agriculture Rural Utilities Service Assistance to Rural Communities with Extremely High Energy Costs to install a 65kW wind turbine. The measured average power density and wind speed at Sand Point measured at 20m (66ft), are 424 W/m2 and 6.7 m/s (14.9 mph) respectively. Two 500kW Vestas turbines were installed and when fully integrated in 2012 are expected to provide a cost effective and clean source of electricity, reduce overall diesel fuel consumption estimated at 130,000 gallons/year and decrease air emissions associated with the consumption of diesel fuel. St. George Island has a Class 7 wind resource, which is superior for wind power development. The current strategy, led by Alaska Energy Authority, is to upgrade the St. George electrical distribution system and power plant. Avian studies in Nikolski and Sand Point have allowed for proper wind turbine siting without killing birds, especially endangered species and bald eagles. APIA continues coordinating and looking for funding opportunities for regional renewable energy projects. An important goal for APIA has been, and will continue to be, to involve community members with renewable energy projects and energy conservation efforts.

Bruce A. Wright

2012-03-27T23:59:59.000Z

462

Advanced Turbine Systems scoping and feasibility studies  

DOE Green Energy (OSTI)

The objective of the Advanced Turbine Systems (ATS) study was to investigate innovative natural gas fired cycle developments to determine the feasibility of achieving 60% (LHV) efficiency within a 10-year time frame. The potential ATS was to be environmentally superior, cost competitive and adaptable to coal-derived fuels. The National Energy Strategy (NES) calls for a balanced program of greater energy efficiency, use of alternative fuels, and the environmentally responsible development of all US energy resources> Consistent with the NES, a Department of Energy (DOE) program has been created to develop Advanced Turbine Systems. The objective of this 10-year program is to develop natural gas fired base load power plants that will have cycle efficiencies greater than 60% (LHV), be environmentally superior to current technology, and also be cost competitive.

Bannister, R.L.; Little, D.A.; Wiant, B.C. (Westinghouse Electric Corp., Orlando, FL (United States)); Archer, D.H. (Carnegie-Mellon Univ., Pittsburgh, PA (United States))

1993-01-01T23:59:59.000Z

463

Battery energy storage market feasibility study  

DOE Green Energy (OSTI)

Under the sponsorship of the Department of Energy`s Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories (SNL) contracted Frost and Sullivan to conduct a market feasibility study of energy storage systems. The study was designed specifically to quantify the energy storage market for utility applications. This study was based on the SNL Opportunities Analysis performed earlier. Many of the groups surveyed, which included electricity providers, battery energy storage vendors, regulators, consultants, and technology advocates, viewed energy storage as an important enabling technology to enable increased use of renewable energy and as a means to solve power quality and asset utilization issues. There are two versions of the document available, an expanded version (approximately 200 pages, SAND97-1275/2) and a short version (approximately 25 pages, SAND97-1275/1).

Kraft, S. [Frost and Sullivan, Mountain View, CA (United States); Akhil, A. [Sandia National Labs., Albuquerque, NM (United States). Energy Storage Systems Analysis and Development Dept.

1997-07-01T23:59:59.000Z

464

Lunar Wireless Power Transfer Feasibility Study  

Science Conference Proceedings (OSTI)

This study examines the feasibility of a multi-kilowatt wireless radio frequency (RF) power system to transfer power between lunar base facilities. Initial analyses, show that wireless power transfer (WPT) systems can be more efficient and less expensive than traditional wired approaches for certain lunar and terrestrial applications. The study includes evaluations of the fundamental limitations of lunar WPT systems, the interrelationships of possible operational parameters, and a baseline design approach for a notionial system that could be used in the near future to power remote facilities at a lunar base. Our notional system includes state-of-the-art photovoltaics (PVs), high-efficiency microwave transmitters, low-mass large-aperture high-power transmit antennas, high-efficiency large-area rectenna receiving arrays, and reconfigurable DC combining circuitry.

Sheldon Freid, et al.

2008-06-01T23:59:59.000Z

465

Bin Set 1 Calcine Retrieval Feasibility Study  

SciTech Connect

At the Department of Energy's Idaho Nuclear Technology and Engineering Center, as an interim waste management measure, both mixed high-level liquid waste and sodium bearing waste have been solidified by a calculation process and are stored in the Calcine Solids Storage Facilities. This calcined product will eventually be treated to allow final disposal in a national geologic repository. The Calcine Solids Storage Facilities comprise seven ''bit sets.'' Bin Set 1, the first to be constructed, was completed in 1959, and has been in service since 1963. It is the only bin set that does not meet current safe-shutdown earthquake seismic criteria. In addition, it is the only bin set that lacks built-in features to aid in calcine retrieval. One option to alleviate the seismic compliance issue is to transport the calcine from Bin Set 1 to another bin set which has the required capacity and which is seismically qualified. This report studies the feasibility of retrieving the calcine from Bi n Set 1 and transporting it into Bin Set 6 which is located approximately 650 feet away. Because Bin Set 1 was not designed for calcine retrieval, and because of the high radiation levels and potential contamination spread from the calcined material, this is a challenging engineering task. This report presents preconceptual design studies for remotely-operated, low-density, pneumatic vacuum retrieval and transport systems and equipment that are based on past work performed by the Raytheon Engineers and Constructors architectural engineering firm. The designs presented are considered feasible; however, future development work will be needed in several areas during the subsequent conceptual design phase.

R. D. Adams; S. M. Berry; K. J. Galloway; T. A. Langenwalter; D. A. Lopez; C. M. Noakes; H. K. Peterson; M. I. Pope; R. J. Turk

1999-10-01T23:59:59.000Z

466

Exoskeleton for Soldier Enhancement Systems Feasibility Study  

DOE Green Energy (OSTI)

The development of a successful exoskeleton for human performance augmentation (EHPA) will require a multi-disciplinary systems approach based upon sound biomechanics, power generation and actuation systems, controls technology, and operator interfaces. The ability to integrate key components into a system that enhances performance without impeding operator mobility is essential. The purpose of this study and report are to address the issue of feasibility of building a fieldable EHPA. Previous efforts, while demonstrating progress and enhancing knowledge, have not approached the level required for a fully functional, fieldable system. It is doubtless that the technologies required for a successful exoskeleton have advanced, and some of them significantly. The question to be addressed in this report is have they advanced to the point of making a system feasible in the next three to five years? In this study, the key technologies required to successfully build an exoskeleton have been examined. The primary focus has been on the key technologies of power sources, actuators, and controls. Power sources, including internal combustion engines, fuel cells, batteries, super capacitors, and hybrid sources have been investigated and compared with respect to the exoskeleton application. Both conventional and non-conventional actuator technologies that could impact EHPA have been assessed. In addition to the current state of the art of actuators, the potential for near-term improvements using non-conventional actuators has also been addressed. Controls strategies, and their implication to the design approach, and the exoskeleton to soldier interface have also been investigated. In addition to these key subsystems and technologies, this report addresses technical concepts and issues relating to an integrated design. A recommended approach, based on the results of the study is also presented.

Jansen, J.F.

2000-09-28T23:59:59.000Z

467

Hydropower Program Technology Overview  

DOE Green Energy (OSTI)

New fact sheets for the DOE Office of Power Technologies (OPT) that provide technology overviews, description of DOE programs, and market potential for each OPT program area.

Not Available

2001-10-01T23:59:59.000Z

468

Hydropower Technology Roundup Report  

Science Conference Proceedings (OSTI)

EPRI's 2002 report, Maintaining and Monitoring Dissolved Oxygen at Hydroelectric Projects: Status Report (1005194) provided a comprehensive review of a wide range of techniques and technologies for improving the dissolved oxygen (DO) levels in releases from hydroelectric projects. This report supplements EPRI 1005194, focusing primarily on aerating turbine technologies for new turbine installations and for turbine upgrades.

2009-12-23T23:59:59.000Z

469

Hydropower Technology Roundup Report  

Science Conference Proceedings (OSTI)

This case study documents the performance best practices experience of Ketchikan Public Utilities (KPU), an Alaskan utility that operates four hydroelectric plants 4.2 MW at Ketchikan, 5 MW at Beaver Falls, 2.1 MW at Silvis, and 22.6 MW at Swan Lake. KPU has increased the performance of its hydroplants through assessment of performance best practices and implementation of performance improvement projects, resulting in increased generation and profitability.

2008-12-22T23:59:59.000Z

470

Energy Basics: Hydropower Technologies  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

expensive source of renewable electricity in the United States today. According to the Energy Information Administration, more than 6% of the country's electricity was produced...

471

Feasibility Assessment for the Development of Training Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

35 Analysis Feasibility Assessment 10_0630 Page 1 of 6 35 Analysis Feasibility Assessment 10_0630 Page 1 of 6 EOTA - Business Form Document Title: Analysis Feasibility Assessment Document Number: ISDF-035 Rev. 10_0630 Document Owner: Vickie Pleau Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-010, Course/Analysis Initiation Process Notify of Changes: MGT, ISD Referenced Document(s): EOTA Contract DE-AT52-07NA26901 ISDF-035 Analysis Feasibility Assessment 10_0630 Page 2 of 6 Revision History: Rev. Description of Change 10_0630 Initial Release ISDF-035 Analysis Feasibility Assessment 10_0630 Page 3 of 6 Feasibility Assessment for the Analysis

472

MiniGhost : a miniapp for exploring boundary exchange strategies using stencil computations in scientific parallel computing.  

Science Conference Proceedings (OSTI)

A broad range of scientific computation involves the use of difference stencils. In a parallel computing environment, this computation is typically implemented by decomposing the spacial domain, inducing a 'halo exchange' of process-owned boundary data. This approach adheres to the Bulk Synchronous Parallel (BSP) model. Because commonly available architectures provide strong inter-node bandwidth relative to latency costs, many codes 'bulk up' these messages by aggregating data into a message as a means of