National Library of Energy BETA

Sample records for mill tailings grand

  1. EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah

    Broader source: Energy.gov [DOE]

    The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Environmental Impact Statement and associated supplements and amendments provides information on the environmental impacts of the U.S. Department of Energy’s (DOE’s) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198, October 1996). The surface remediation alternatives analyzed in the EIS include on-site disposal of the contaminated materials and off-site disposal at one of three alternative locations in Utah using one or more transportation options: truck, rail, or slurry pipeline.

  2. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand...

    Office of Environmental Management (EM)

    water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water ...

  3. Assessment of cover systems at the Grand Junction, Colorado, uranium mill tailings pile: 1987 field measurements

    SciTech Connect (OSTI)

    Gee, G.W.; Campbell, M.D.; Freeman, H.D.; Cline, J.F.

    1989-02-01

    Four Pacific Northwest Laboratory (PNL) scientists and a technician conducted an onsite evaluation of radon gas exhalation, water content profiles, and plant and animal intrusion for a series of cover systems located on the uranium mill tailings pile at Grand Junction, Colorado. These six plots were sampled extensively down to the radon control layer (e.g., asphalt or wet clay) for soil moisture content and permeability. Radon gas emission through the surface was measured. Soil samples were collected and analyzed in the lab for particle-size distribution, particle density, bulk density, and ambient water content. Prairie dog burrows were excavated to discover the extent to which they penetrated the barriers. Plant type, density, and cover characteristics were measured.

  4. Comments and responses on the Remedial Action Plan and site design for stabilization of the Inactive Uranium Mill Tailings Site, Grand Junction, Colorado. Revision 1

    SciTech Connect (OSTI)

    1994-01-01

    This report contains information concerning public comments and responses on the remedial action plan and site design for stabilization of the inactive uranium mill tailings site in Grand Junction, Colorado.

  5. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Grand Junction, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Grand Junction, Colorado evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site. This risk assessment follows an approach outlined by the EPA. the first step is to evaluate ground water data collected from monitor wells at the site. Evaluation of these data showed that the contaminants of potential concern in the ground water are arsenic, cadmium, cobalt, fluoride, iron, manganese, molybdenum, nickel, sulfate, uranium, vanadium, zinc, and radium-226. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if they drank from a well installed in the contaminated ground water at the former processing site.

  6. DOE - Office of Legacy Management -- Climax Uranium Co Grand Junction Mill

    Office of Legacy Management (LM)

    - CO 0-03 Climax Uranium Co Grand Junction Mill - CO 0-03 FUSRAP Considered Sites Site: Climax Uranium Co. (Grand Junction Mill) (CO.0-03) Licensed to DOE for long-term custody and managed by the Office of Legacy Management. Designated Name: Grand Junction, Colorado, Processing Site Alternate Name: Climax Uranium Company (Grand Junction Mill) Grand Junction Uranium Mill Tailings Remedial Action Site Climax Mill Site Grand Junction Mill 1 Location: Grand Junction, Colorado Evaluation Year:

  7. Engineering assessment of inactive uranium mill tailings

    SciTech Connect (OSTI)

    Not Available

    1981-07-01

    The Grand Junction site has been reevaluated in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Grand Junction, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.9 million tons of tailings at the Grand Junction site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented herein range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through VIII). Cost estimates for the eight options range from about $10,200,000 for stabilization in-place to about $39,500,000 for disposal in the DeBeque area, at a distance of about 35 mi, using transportation by rail. If transportation to DeBeque were by truck, the cost estimated to be about $41,900,000. Three principal alternatives for the reprocessing of the Grand Junction tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $200/lb by heap leach and $150/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery appears not to be economically attractive.

  8. DOE Moab Project Safely Removes 7 Million Tons of Mill Tailings

    Broader source: Energy.gov [DOE]

    (Grand Junction, CO) ― The U.S. Department of Energy (DOE) has safely moved another million tons of uranium mill tailings from the Moab site in Utah under the Uranium Mill Tailings Remedial Action Project.

  9. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement (July 2005)

    SciTech Connect (OSTI)

    N /A

    2005-08-05

    The U.S. Department of Energy (DOE or the Department) is proposing to clean up surface contamination and implement a ground water compliance strategy to address contamination that resulted from historical uranium-ore processing at the Moab Uranium Mill Tailings Site (Moab site), Grand County, Utah. Pursuant to the National Environmental Policy Act (NEPA), 42 United States Code (U.S.C.) {section} 4321 et seq., DOE prepared this environmental impact statement (EIS) to assess the potential environmental impacts of remediating the Moab site and vicinity properties (properties where uranium mill tailings were used as construction or fill material before the potential hazards associated with the tailings were known). DOE analyzed the potential environmental impacts of both on-site and off-site remediation and disposal alternatives involving both surface and ground water contamination. DOE also analyzed the No Action alternative as required by NEPA implementing regulations promulgated by the Council on Environmental Quality. DOE has determined that its preferred alternatives are the off-site disposal of the Moab uranium mill tailings pile, combined with active ground water remediation at the Moab site. The preferred off-site disposal location is the Crescent Junction site, and the preferred method of transportation is rail. The basis for this determination is discussed later in this Summary. DOE has entered into agreements with 12 federal, tribal, state, and local agencies to be cooperating agencies in the development and preparation of this EIS. Several of the cooperating agencies have jurisdiction by law and intend to use the EIS to support their own decisionmaking. The others have expertise relevant to potential environmental, social, or economic impacts within their geographic regions. During the preparation of the EIS, DOE met with the cooperating agencies, provided them with opportunities to review preliminary versions of the document, and addressed their comments

  10. DOE Moab Project Reaches Halfway Mark in Mill Tailings Removal 2.5 Million Hours Safely Worked

    Office of Energy Efficiency and Renewable Energy (EERE)

    (Grand Junction, CO) ― The U.S. Department of Energy (DOE) has reached 8 million tons of uranium mill tailings removed from the Moab site in Utah under the Uranium Mill Tailings Remedial Action Project.

  11. 6 Million Tons of Mill Tailings Removed From DOE Moab Project Site

    Broader source: Energy.gov [DOE]

    (Grand Junction, CO) ― Today, the Department of Energy (DOE) announced that 6 million tons of uranium mill tailings have been shipped from Moab, Utah, under the Uranium Mill Tailings Remedial Action Project to an engineered disposal cell near Crescent Junction, Utah.

  12. Moab Project Disposes 2 Million Tons of Uranium Mill Tailings...

    Office of Environmental Management (EM)

    The Moab Uranium Mill Tailings Remedial Action Project reached its primary American ... of schedule on Wednesday with the disposal of 2 million tons of uranium mill tailings. ...

  13. Moab Mill Tailings Removal Project Plans to Resume Train Shipments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tons of Mill Tailings Removed From DOE Moab Project Site Laborers place a disposable liner in a tailings container. Moab Project Continues Progress on Tailings Removal with...

  14. DOE Awards Contract for Moab Mill Tailings Cleanup | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Moab Mill Tailings Cleanup DOE Awards Contract for Moab Mill Tailings Cleanup November 4, ... has awarded a competitive small business contract worth 121.2 million over the next five ...

  15. DOE Moab Project Reaches Halfway Mark in Mill Tailings Removal...

    Office of Environmental Management (EM)

    The U.S. Department of Energy (DOE) has reached 8 million tons of uranium mill tailings removed from the Moab site in Utah under the Uranium Mill Tailings Remedial Action Project. ...

  16. Task Order Awarded for Moab Uranium Mill Tailings Remedial Action...

    Office of Environmental Management (EM)

    Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On ...

  17. Moab Mill Tailings Removal Project Celebrates 5 Years of Success |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Removal Project Celebrates 5 Years of Success Moab Mill Tailings Removal Project Celebrates 5 Years of Success October 3, 2012 - 12:00pm Addthis Pictured here is the Moab uranium mill tailings pile. Tailings excavation and conditioning activities are seen in the foreground. The water spray is used to eliminate extracted contaminated groundwater. Pictured here is the Moab uranium mill tailings pile. Tailings excavation and conditioning activities are seen in the

  18. Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action

    Office of Legacy Management (LM)

    Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under

  19. DOE Announces Preferred Alternatives For Moab, Utah, Uranium Mill Tailings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Preferred Alternatives For Moab, Utah, Uranium Mill Tailings DOE Announces Preferred Alternatives For Moab, Utah, Uranium Mill Tailings April 6, 2005 - 11:33am Addthis WASHINGTON, DC - The U.S. Department of Energy today announced the department's preferred alternatives for remediation of the Moab, Utah, Uranium Mill Tailings Remedial Action Project Site: active groundwater remediation, and offsite disposal of the tailings pile and other contaminated materials to the

  20. Uranium Mill Tailings Radiation Control Act Sites Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act Title I and II disposal and processing sites. The sites are managed by the U.S. Department of Energy Office of Legacy Management. Introduction The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604) is a federal law that provides for the safe and environmentally sound disposal, long-term stabilization, and control of uranium mill tailings in a manner that minimizes or

  1. Accelerated aging tests of liners for uranium mill tailings disposal

    SciTech Connect (OSTI)

    Barnes, S.M.; Buelt, J.L.; Hale, V.Q.

    1981-11-01

    This document describes the results of accelerated aging tests to determine the long-term effectiveness of selected impoundment liner materials in a uranium mill tailings environment. The study was sponsored by the US Department of Energy under the Uranium Mill Tailings Remedial Action Project. The study was designed to evaluate the need for, and the performance of, several candidate liners for isolating mill tailings leachate in conformance with proposed Environmental Protection Agency and Nuclear Regulatory Commission requirements. The liners were subjected to conditions known to accelerate the degradation mechanisms of the various liners. Also, a test environment was maintained that modeled the expected conditions at a mill tailings impoundment, including ground subsidence and the weight loading of tailings on the liners. A comparison of installation costs was also performed for the candidate liners. The laboratory testing and cost information prompted the selection of a catalytic airblown asphalt membrane and a sodium bentonite-amended soil for fiscal year 1981 field testing.

  2. Moab Mill Tailings Pile 25 Percent Disposed: DOE Moab Project...

    Energy Savers [EERE]

    Donald Metzler Moab Federal Project Director (970) 257-2115 Wendee Ryan S&K Aerospace Public Affairs Manager (970) 257-2145 Grand Junction, CO - One quarter of the uranium mill ...

  3. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect (OSTI)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  4. Transportation of the MOAB Uranium Mill Tailings to White Mesa Mill by Slurry Pipeline

    SciTech Connect (OSTI)

    Hochstein, R. F.; Warner, R.; Wetz, T. V.

    2003-02-26

    The Moab uranium mill tailings pile, located at the former Atlas Minerals Corporation site approximately three miles north of Moab, Utah, is now under the control of the US Department of Energy (''DOE''). The location of the tailings pile adjacent to the Colorado River, and the ongoing contamination of groundwater and seepage of pollutants into the river, have lead to the investigation, as part of the final site remediation program, of alternatives to relocate the tailings to a qualified permanent disposal site. This paper will describe the approach being taken by the team formed between International Uranium (USA) Corporation (''IUC'') and Washington Group International (''WGINT'') to develop an innovative technical proposal to relocate the Moab tailings to IUC's White Mesa Mill south of Blanding, Utah. The proposed approach for relocating the tailings involves using a slurry pipeline to transport the tailings to the White Mesa Mill. The White Mesa Mill is a fully licensed, active uranium mill site that is uniquely suited for permanent disposal of the Moab tailings. The tailings slurry would be dewatered at the White Mesa Mill, the slurry water would be recycled to the Moab site for reuse in slurry makeup, and the ''dry'' tailings would be permanently disposed of in an approved below grade cell at the mill site.

  5. Cost of radon-barrier systems for uranium mill tailings

    SciTech Connect (OSTI)

    Baker, E.G.; Hartley, J.N.

    1982-08-01

    This report deals specifically with the cost of three types of radon barrier systems, earthen covers, asphalt emulsion covers, and multilayer covers, which could meet standards proposed by the Environmental Protection Agency to stabilize uranium mill tailings located primarily in the western US. In addition, the report includes a sensitivity analysis of various factors which significantly effect the overall cost of the three systems. These analyses were based on a generic disposal site. Four different 3m thick earthen covers were tested and cost an average of $27/m/sup 2/. The least expensive earthen cover cost was about $21/m/sup 2/. The asphalt cover system (6 to 7 cm of asphalt topped with 0.6m of overburden) cost about $28/m/sup 2/. The four multilayer covers averaged $57/m/sup 2/, but materials handling problems encountered during the test inflated this cost above what was anticipated and significant cost reductions should be possible. The least expensive multilayer cover cost $43/m/sup 2/. Based on the results of the Grand Junction field test we estimated the cost of covering the tailings from three high priority sites, Durango, Shiprock, and Salt Lake City (Vitro). The cost of a 3m earthen cover ranged from $18 to 33/m/sup 2/ for the seven disposal sites (two or three at each location) studied. The cost of asphalt cover systems were $23 to 28/m/sup 2/ and the multilayer cover costs were between $31 to 36/m/sup 2/. The earthen cover costs are less than the Grand Junction field test cost primarily because cover material is available at or near most of the disposal sites selected. Earthen material was imported from 6 to 10 miles for the field test. Assuming more efficienct utilization of materials significantly reduced the cost of the multilayer covers.

  6. Monticello Mill Tailings Site Operable Unit III Annual Groundwater...

    Office of Legacy Management (LM)

    ... of a buried water pipeline to an existing solar evaporation pond for water treatment. ... the Abajo Mountains, U.S. Department of Energy Monticello Mill Tailings Site OU III ...

  7. Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Meeting in Vienna | Department of Energy Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna October 22, 2012 - 12:00pm Addthis Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler presents at the Uranium

  8. Tailings Pile Seepage Model The Atlas Corporation Moab Mill Moab, Utah

    SciTech Connect (OSTI)

    Easterly, CE

    2001-11-05

    The project described in this report was conducted by personnel from Oak Ridge National Laboratory's Grand Junction Office (ORNL/GJ). This report has been prepared as a companion report to the Limited Groundwater Investigation of the Atlas Corporation Moab Mill, Moab, Utah. The purpose of this report is to present the results of the tailings pile seepage modeling effort tasked by the U.S. Nuclear Regulatory Commission (NRC).

  9. Asphalt emulsion sealing of uranium mill tailings. 1979 annual report

    SciTech Connect (OSTI)

    Hartley, J.N.; Koehmstedt, P.L.; Esterl, D.J.; Freeman, H.D.

    1980-06-01

    Uranium mill tailings are a source of low-level radiation and radioactive materials that may be released into the environment. Stabilization or disposal of these tailings in a safe and environmentally sound way is necessary to minimize radon exhalation and other radioactive releases. One of the most promising concepts for stabilizing uranium tailings is being investigated at the Pacific Northwest Laboratory: the use of asphalt emulsion to contain radon and other potentially hazardous materials in uranium tailings. Results of these studies indicate that radon flux from uranium tailings can be reduced by greater than 99% by covering the tailings with an asphalt emulsion that is poured on or sprayed on (3.0 to 7.0 mm thick), or mixed with some of the tailings and compacted to form an admixture seal (2.5 to 15.2 cm) containing 18 wt % residual asphalt.

  10. Moab Project Disposes 2 Million Tons of Uranium Mill Tailings with Recovery

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act Funds | Department of Energy Moab Project Disposes 2 Million Tons of Uranium Mill Tailings with Recovery Act Funds Moab Project Disposes 2 Million Tons of Uranium Mill Tailings with Recovery Act Funds The Moab Uranium Mill Tailings Remedial Action Project reached its primary American Recovery and Reinvestment Act milestone ahead of schedule on Wednesday with the disposal of 2 million tons of uranium mill tailings. The project had originally planned to ship 2 million tons of tailings with

  11. DOE Awards Technical Assistance Contract for Moab Mill Tailings Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Technical Assistance Contract for Moab Mill Tailings Cleanup DOE Awards Technical Assistance Contract for Moab Mill Tailings Cleanup May 31, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati-The U.S. Department of Energy (DOE) today announced the award of an $18 million small disadvantaged business contract with S&K Aerospace, LLC, of St. Ignatius, Montana to continue to provide technical assistance services for the Moab

  12. Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project

    SciTech Connect (OSTI)

    Not Available

    1989-09-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

  13. Asphalt emulsion radon barrier systems for uranium mill tailings: an overview of the technology

    SciTech Connect (OSTI)

    Baker, E.G.; Hartley, J.N.; Freeman, H.D.; Gates, T.E.; Nelson, D.A.; Dunning, R.L.

    1984-03-01

    Pacific Northwest Laboratory (PNL), under contract to the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP) office, has developed an asphalt emulsion cover system to reduce the release of radon from uranium mill tailings. The system has been field tested at Grand Junction, Colorado. Results from laboratory and field tests indicate that this system is effective in reducing radon release to near-background levels (<2.5 pCi m/sup -2/s/sup -1/) and has the properties required for long-term effectiveness and stability. Engineering specifications have been developed, and analysis indicates that asphalt emulsion covers are cost-competitive with other cover systems. This report summarizes the technology for asphalt emulsion radon barrier systems. 59 references, 45 figures, 36 tables.

  14. Liner evaluation for uranium mill tailings. Final report

    SciTech Connect (OSTI)

    Buelt, J.L. (comp.)

    1983-09-01

    The Liner Evaluation for Uranium Mill Tailings Program was conducted to evaluate the need for and performance of prospective lining materials for the long-term management of inactive uranium mill tailings piles. On the basis of program results, two materials have been identified: natural foundation soil amended with 10% sodium bentonite; catalytic airblown asphalt membrane. The study showed that, for most situations, calcareous soils typical of Western US sites adequately buffer tailings leachates and prevent groundwater contamination without additional liner materials or amendments. Although mathematical modeling of disposal sites is recommended on a site-specific basis, there appears to be no reason to expect significant infiltration through the cover for most Western sites. The major water source through the tailings would be groundwater movement at sites with shallow groundwater tables. Even so column leaching studies showed that contaminant source terms were reduced to near maximum contaminant levels (MCL's) for drinking water within one or two pore volumes; thus, a limited source term for groundwater contamination exists. At sites where significant groundwater movement or infiltration is expected and the tailings leachates are alkaline, however, the sodium bentonite or asphalt membrane may be necessary.

  15. CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE August 2, 2010 - 12:00pm Addthis A sheep’s foot roller compacts the tailings in the disposal cell. A sheep's foot roller compacts the tailings in the disposal cell. Moab, UT MILL TAILINGS REMOVAL Sixteen million tons of uranium mill tailings 80 feet high stood on the banks of the Colorado River near Moab in southeast

  16. Uranium Mill Tailings Remedial Action Program. Annual status report

    SciTech Connect (OSTI)

    Not Available

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan.

  17. Revegetation/rock cover for stabilization of inactive uranium mill tailings disposal sites

    SciTech Connect (OSTI)

    Beedlow, P.A.; McShane, M.C.; Cadwell, L.L.

    1982-07-01

    Pacific Northwest Laboratory is developing design and performance guidelines for surface stabilization of inactive uranium mill tailings. In this work, vegetation and rock covers are being evaluated for maintaining long-term integrity of impoundment systems. Methods are being developed to estimate erosion rates associated with rock and/or vegetation covers, and to determine the effects of surface treatments on soil moisture. Interactions between surface treatments and barriers (radon and biological) are being studied as well. The product will be a set of guidelines to aid in designing surface covers. This report presents the status of this program and a discussion of considerations pertinent to the application of surface covers to tailings. Test plots located in Grand Junction, Colorado and Waterflow, New Mexico are being used to study: (1) the interactions between vegetation and radon and biological barriers, (2) the effects of surface covers on soil moisture, and (3) the effects of rock covers on vegetation.

  18. DOE to Transport Moab Mill Tailings by Rail | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Transport Moab Mill Tailings by Rail DOE to Transport Moab Mill Tailings by Rail August 5, 2008 - 2:40pm Addthis Department Approves Project Baseline and Obtains Nuclear Regulatory Commission Nod WASHINGTON, DC - The U.S. Department of Energy (DOE) today reaffirmed its prior decision to relocate mill tailings predominantly by rail from the former uranium-ore processing site near Moab, Utah, 30 miles north to Crescent Junction, Utah. As determined previously, oversized material that is not

  19. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    SciTech Connect (OSTI)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  20. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  1. Monitoring the Performance of an Alternative Landfill Cover at the Monticello, Utah, Uranium Mill Tailings Disposal Site

    Broader source: Energy.gov [DOE]

    Monitoring the Performance of an Alternative Landfill Cover at the Monticello, Utah, Uranium Mill Tailings Disposal Site

  2. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995

    SciTech Connect (OSTI)

    1995-12-01

    This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

  3. Moab Mill Tailings Removal Project Plans to Resume Train Shipments in March; All of the Laid Off Workers Will Return

    Broader source: Energy.gov [DOE]

    Grand Junction, CO ― All 27 employees of the Remedial Action Contractor (RAC) to the U.S. Department of Energy will return to work on the Uranium Mill Tailings Remedial Action Project on March 4, following a 3-month planned furlough. Project shipping and disposal operations have been shut down, as planned, since late November 2012, but are scheduled to resume March 7, after the contractor ensures employees have received refresher training, reviewed procedures, and measures are in place for a safe startup.

  4. Remediation of the Moab Uranium Mill Tailings, Grand and San...

    Office of Environmental Management (EM)

    ... LR-2EBC Gas Turbine - 160 MW - Exported Only through Intergen Proposed Power Line LR-2EBC Steam Turbine - 150 MW - Exported Only through Intergen Proposed Power Line LR-1EAX Gas ...

  5. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  6. DOE Amends Decision for the Remediation of the Moab Uranium Mill Tailings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Moab, Utah | Department of Energy Amends Decision for the Remediation of the Moab Uranium Mill Tailings in Moab, Utah DOE Amends Decision for the Remediation of the Moab Uranium Mill Tailings in Moab, Utah February 29, 2008 - 11:43am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced an amendment to its 2005 Record of Decision (ROD) for the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project to allow for the use of truck or rail in transporting residual

  7. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings

    Office of Scientific and Technical Information (OSTI)

    Radiation Control Act Title II Disposal Sites (Technical Report) | SciTech Connect Technical Report: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites Citation Details In-Document Search Title: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites This report, in fulfillment of a license requirement, presents the results of long-term surveillance and

  8. Scientific basis for risk assessment and management of uranium mill tailings

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    A National Research Council study panel, convened by the Board on Radioactive Waste Management, has examined the scientific basis for risk assessment and management of uranium mill tailings and issued this final report containing a number of recommendations. Chapter 1 provides a brief introduction to the problem. Chapter 2 examines the processes of uranium extraction and the mechanisms by which radionuclides and toxic chemicals contained in the ore can enter the environment. Chapter 3 is devoted to a review of the evidence on health risks associated with radon and its decay products. Chapter 4 provides a consideration of conventional and possible new technical alternatives for tailings management. Chapter 5 explores a number of issues of comparative risk, provides a brief history of uranium mill tailings regulation, and concludes with a discussion of choices that must be made in mill tailing risk management. 211 refs., 30 figs., 27 tabs.

  9. Engineering assessment of inactive uranium mill tailings: Monument Valley Site, Monument Valley, Arizona

    SciTech Connect (OSTI)

    Not Available

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevalated the Monument Valley site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Monument Valley, Arizona. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposure of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.1 million tons of tailings at the Monument Valley site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through IV). Cost estimates for the four options range from about $6,600,000 for stabilization in-place, to about $15,900,000 for disposal at a distance of about 15 mi. Three principal alternatives for reprocessing the Monument Valley tailings were examined: heap leaching; Treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovery is economically unattractive.

  10. Assessment of the radiological impact of the inactive uranium-mill tailings at Mexican Hat, Utah

    SciTech Connect (OSTI)

    Haywood, F.F.; Goldsmith, W.A.; Ellis, B.S.; Hubbard, H.M. Jr.; Fox, W.F.; Shinpaugh, W.H.

    1980-03-01

    High surface soil concentrations of /sup 226/Ra and high above-ground measurements of gamma-ray intensity in the vicinity of the inactive uranium-mill tailings at Mexican Hat show both wind and water erosion of the tailings. The former mill area, occupied by a trade school at the time of this survey, shows a comparatively high level of contamination, probably from unprocessed ore on the surface of the ore storage area near the location of the former mill buildings. However, the estimated health effect of exposure to gamma rays during a 2000-hr work year in the area represents an increase of 0.1% in the risk of death from cancer. Exposure of less than 600 persons within 1.6 km of the tailings to radon daughters results in an estimated 0.2%/year increase in risk of lung cancer.

  11. Moab Mill Tailings Removal Project Reaches 5 Million Tons Disposed...

    Energy Savers [EERE]

    Donald Metzler, Moab Federal Project Director, (970) 257-2115 Wendee Ryan, S&K Aerospace Public Affairs Manager, (970) 257-2145 Grand Junction, CO- The U.S. Department of Energy ...

  12. Process for Transition of Uranium Mill Tailings Radiation Control Act Title

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance | Department of Energy Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term

  13. Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Follow-On Effort | Department of Energy for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort April 20, 2016 - 11:30am Addthis Media Contact: Lynette Chafin 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Fixed Unit Rate and Cost Reimbursement Task Order issued under the Office of Environmental Management Nationwide

  14. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    SciTech Connect (OSTI)

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project.

  15. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  16. Engineering assessment of inactive uranium mill tailings: Mexican Hat Site, Mexican Hat, Utah

    SciTech Connect (OSTI)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Mexican Hat site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Mexican Hat, Utah. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.2 million tons of tailings at the Mexican Hat site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $15,200,000 for stabilization in place, to about $45,500,000 for disposal at a distance of about 16 mi. Three principal alternatives for the reprocessing of the Mexican Hat tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $115/lb of U/sub 3/O/sub 8/ whether by heap leach or conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Reprocessing the Mexican Hat tailings for uranium recovery is not economically attractive under present conditions.

  17. Summary of the engineering assessment of inactive uranium mill tailings, Shiprock Site, Shiprock, New Mexico

    SciTech Connect (OSTI)

    1981-07-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Shiprock site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Shiprock, New Mexico. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.5 million dry tons of tailings at the Shiprock site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The eight alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of the stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through VIII). Cost estimates for the eight options range from about $13,400,000 for stabilization in place to about $37,900,000 for disposal at a distance of about 16 miles. Three principal alternatives for the reprocessing of the Shiprock tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and(c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $230/lb by heap leach and $250/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive.

  18. Engineering assessment of inactive uranium mill tailings: Maybell Site, Maybell, Colorado

    SciTech Connect (OSTI)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Maybell site in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.6 million dry tons of tailings at the Maybell site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The two alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to disposal of the tailings in a nearby open pit mine and decontamination of the tailings site (Option II). Cost estimates for the two options are about $11,700,000 for stabilization in-place and about $22,700,000 for disposal within a distance of 2 mi. Three principal alternatives for the reprocessing of the Maybell tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $125 and $165/lb of U/sub 3/O/sub 8/ by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present.

  19. Engineering assessment of inactive uranium mill tailings: Maybell Site, Maybell, Colorado. Summary

    SciTech Connect (OSTI)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Maybell site in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.6 million dry tons of tailings at the Maybell site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The two alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to disposal of the tailings in a nearby open pit mine and decontamination of the tailings site (Option II). Cost estimates for the two options are about $11,700,000 for stabilization in-place and about $22,700,000 for disposal within a distance of 2 mi. Three principal alternatives for the reprocessing of the Maybell tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $125 and $165/lb of U/sub 3/O/sub 8/ by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present.

  20. Monticello Mill Tailings, Operable Unit III Surface and Ground Water Remedial Investigation Addendum/Focused Feasibility Study

    Office of Legacy Management (LM)

    S H E E T November 2003 Figure 1. Monticello Millsite Location Background The Monticello Mill Tailings Site is a former ore-buying station and vanadium and uranium mill that operated from about 1942 through 1959 (see Figure 1). The former millsite and nearby properties are being cleaned up as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Monticello Mill Tailings Site was placed on the U.S. Environmental Protection Agency National Priorities

  1. 2015 Annual Inspection report for the DOE Monticello, Utah, Mill Tailings Site and Monticello Vicinity Properties

    Office of Legacy Management (LM)

    Annual Inspection Report for the DOE Monticello, Utah, Mill Tailings Site and Monticello Vicinity Properties December 2015 LMS/MNT/S13444 This page intentionally left blank U.S. Department of Energy 2015 Annual Inspection-Monticello, Utah December 2015 Doc. No. S13444 Page i Contents Abbreviations .................................................................................................................................. ii Executive Summary

  2. Engineering assessment of inactive uranium mill tailings, Gunnison Site, Gunnison, Colorado: summary

    SciTech Connect (OSTI)

    none,

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Gunnison site in order to revise the November 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Gunnison, Colorado. This evaluation has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the ivnvestigations of site hydrology and meteorology, and the evaluation and costing of alternative remedial actions. Radon gas released from the combined 540,000 dry tons of tailings and the 435,400 tons of contaminated waste at the Gunnison site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The 10 alternative actions presented in this engineering assessment range from stabilization of the site in its present location with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to disposal sites along with decontamination of the Gunnison site (Options II through X). Cost estimates for the 10 options range from about $8,900,000 for stabilization in-place, to about $14,000,000 for disposal in the North Alkali Creek area at a distance of about 18 mi. Truck haulage would be used to transport the tailings and contaminated materials from the Gunnison site to the selected disposal site. Three principal alternatives for the reprocessing of the Gunnison tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocesssing. The cost of the uranium recovered would be about $250 and $230/lb of U/sub 3/O/sub 8/ by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981.

  3. Cleanup of inactive Uranium Mill Tailings Sites in the Navajo Nation

    SciTech Connect (OSTI)

    Martin, B.

    1994-12-31

    The U.S. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978 to address potential and significant radiation health hazards to the public from active and inactive mill operations. Title I to the UMTRCA identified sites to be designated for remedial action. These include four uranium mill tailings remedial action (UMTRA) sites in the Navajo Nation. These sites are located in Shiprock, New Mexico; Tuba City, Arizona; Cane Valley, Arizona; and Halchita, Utah. The U.S. Department of Energy (DOE) was directed to select and execute a plan of remedial action that provides long-term stabilization and control of radioactive materials and satisfies the U.S. Environmental Protection Agency standards and other applicable laws and regulations.

  4. Long-term protection of uranium mill tailings

    SciTech Connect (OSTI)

    Beedlow, P.A.; Hartley, J.N.

    1984-04-01

    US Environmental Protection Agency standards for the cleanup and disposal of inactive tailings sites require that control measures for disposal of tailings be designed to be effective for up to 1000 years if reasonably achievable, and, in any case, for 200 years at least. To control the escape of contaminants over such long periods, containment systems must be capable of adjusting to changing environmental conditions. Elements of a containment system include surface covers, biotic barriers, radon barriers, and, in some cases, liners. Each element of the system affects the others, and the whole system responds to the surrounding environment. Interaction is facilitated primarily by soil moisture. Consequently, the control of soil moisture is critical to the effectiveness of containment systems. Protective covers are necessary to prevent disruption of the containment system by physical or biological factors, to provide for the effective functioning of the radon barrier, and to prevent infiltration of excess water that could cause leaching. In order to design protective covers, a working knowledge of the factors and processes impacting tailings piles is required. This report characterizes the major factors and processes, and presents generic solutions based on current research. 65 references, 9 figures, 6 tables.

  5. The U.S. regulatory framework for long-term management of uranium mill tailings

    SciTech Connect (OSTI)

    Smythe, C.; Bierley, D.; Bradshaw, M.

    1995-03-01

    The US established the regulatory structure for the management, disposal, and long-term care of uranium mill tailings in 1978 with the passage of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (Pub. L. 95-604). This legislation has governed the cleanup and disposal of uranium tailings at both inactive and active sites. The passage of the UMTRCA established a federal regulatory program for the cleanup and disposal of uranium mill tailings in the US. This program involves the DOE, the NRC, the EPA, various states and tribal governments, private licensees, and the general public. The DOE has completed surface remediation at 14 sites, with the remaining sites either under construction or in planning. The DOE`s UMTRA Project has been very successful in dealing with public and agency demands, particularly regarding disposal site selection and transportation issues. The active sites are also being cleaned up, but at a slower pace than the inactive sites, with the first site tentatively scheduled for completion in 1996.

  6. Paleoclimatic data applications: Long-term performance of uranium mill tailings repositories

    SciTech Connect (OSTI)

    Waugh, W.J.; Petersen, K.L.

    1995-09-01

    Abandoned uranium mill tailings sites in the Four Corners region are a lasting legacy of the Cold War. The U.S. Department of Energy (DOE) is designing landfill repositories that will isolate hazardous constituents of tailings from biological intrusion, erosion, and the underlying aquifer for up to 1,000 years. With evidence of relatively rapid past climate change, and model predictions of global climatic variation exceeding the historical record, DOE recognizes a need to incorporate possible ranges of future climatic and ecological change in the repository design process. In the Four Corners region, the center of uranium mining and milling activities in the United States, proxy paleoclimatic records may be useful not only as a window on the past, but also as analogs of possible local responses to future global change. We reconstructed past climate change using available proxy data from tree rings, packrat middens, lake sediment pollen, and archaeological records. Interpretation of proxy paleoclimatic records was based on present-day relationships between plant distribution, precipitation, and temperature along a generalized elevational gradient for the region. For the Monticello, Utah, uranium mill tailings site, this first approximation yielded mean annual temperature and precipitation ranges of 2 to 10{degrees} C, and 38 to 80 cm, respectively, corresponding to late glacial and Altithermal periods. These data are considered to be reasonable ranges of future climatic conditions that can be input to evaluations of groundwater recharge, radon-gas escape, erosion, frost penetration, and biointrusion in engineered earthen barriers designed to isolate tailings.

  7. Summary of the engineering assessment of inactive uranium mill tailings, Tuba City site, Tuba City, Arizona

    SciTech Connect (OSTI)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Tuba City site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Tuba City, Arizona. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 0.8 million tons of tailings at the Tuba City site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors.

  8. Engineering assessment of inactive uranium mill tailings, Tuba City site, Tuba City, Arizona

    SciTech Connect (OSTI)

    Not Available

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Tuba City site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Tuba City, Arizona. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 0.8 million tons of tailings at the Tuba City site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors.

  9. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.

  10. Grand Junction, Colorado, Processing Site and Disposal Sites Fact Sheet

    Office of Legacy Management (LM)

    Grand Junction, Colorado, Disposal and Processing Sites This fact sheet provides information about the Uranium Mill Tailings Radiation Control Act of 1978 Title I disposal and processing sites at Grand Junction, Colorado. These sites are managed by the U.S. Department of Energy Office of Legacy Management. Locations of the Grand Junction, Colorado, Sites Site Description and History The former Grand Junction processing site, historically known as the Climax uranium mill, sits at an elevation of

  11. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    SciTech Connect (OSTI)

    None, None

    2014-03-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

  12. BASELINE RISK ASSESSMENT OF GROUND WATER CONTAMINATION AT THE URAN~UM MILL TAILINGS

    Office of Legacy Management (LM)

    I~:-:ii*.i: i,<;.;.-;_r- --:-:ir-- - . . - -. . - . . - , -, . , , , - - - - . BASELINE RISK ASSESSMENT OF GROUND WATER CONTAMINATION AT THE URAN~UM MILL TAILINGS SITE NEAR RIVERTON, WYOMING I i I I I Prepared by the U.S. Department of Energy Albuquerque, New Mexico September 1995 INTENDED FOR PUBLIC RELEASE This report has been reproduced from the best available copy. Avai and microfiche Number of pages in this report: 166 DOE and DOE contractors can obtain copies of this report from: Office

  13. [Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan

    SciTech Connect (OSTI)

    Not Available

    1992-06-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

  14. Environmental factors affecting long-term stabilization of radon suppression covers for uranium mill tailings

    SciTech Connect (OSTI)

    Young, J.K.; Long, L.W.; Reis, J.W.

    1982-04-01

    Pacific Northwest Laboratory is investigating the use of a rock armoring blanket (riprap) to mitigate wind and water erosion of an earthen radon suppression cover applied to uranium mill tailings. To help determine design stresses for the tailings piles, environmental parameters are characterized for the five active uranium-producing regions on a site-specific basis. Only conventional uranium mills that are currently operating or that are scheduled to open in the mid 1980s are considered. Available data indicate that flooding has the most potential for disrupting a tailings pile. The arid regions of the Wyoming Basins and the Colorado Plateau are subject to brief storms of high intensity. The Texas Gulf Coast has the highest potential for extreme precipitation from hurricane-related storms. Wind data indicate average wind speeds from 3 to 6 m/sec for the sites, but extremes of 40 m/sec can be expected. Tornado risks range from low to moderate. The Colorado Plateau has the highest seismic potential, with maximum acceleration caused by earthquakes ranging from 0.2 to 0.4 g. Any direct effect from volcanic eruption is negligible, as all mills are located 90 km or more from an igneous or hydrothermal system.

  15. Radiological survey of the inactive uranium-mill tailings at Rifle, Colorado

    SciTech Connect (OSTI)

    Haywood, F.F.; Jacobs, D.J.; Ellis, B.S.; Hubbard, H.M. Jr.; Shinpaugh, W.H.

    1980-06-01

    Results of radiological surveys of two inactive uranium-mill sites near Rifle, Colorado, in May 1976 are presented. These sites are referred to as Old Rifle and New Rifle. The calculated /sup 226/Ra inventory of the latter site is much higher than at the older mill location. Data on above-ground measurements of gamma exposure rates, surface and near-surface concentration of /sup 226/Ra in soil and sediment samples, concentration of /sup 226/Ra in water, calculated subsurface distribution of /sup 226/Ra, and particulate radionuclide concentrations in air samples are given. The data serve to define the extent of contamination in the vicinity of the mill sites and their immediate surrounding areas with tailings particles. Results of these measurements were utilized as technical input for an engineering assessment of these two sites.

  16. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  17. Radiological survey of the inactive uranium-mill tailings at Maybell, Colorado

    SciTech Connect (OSTI)

    Haywood, F.F.; Perdue, P.T.; Ellis, B.S.

    1980-03-01

    Results of a radiological survey of the inactive uranium-mill tailings near Maybell, Colorado are presented. Measurements of external gamma exposure rate at 1 m above the tailings ranged 16 to 340 ..mu..R/hr with an average value of 65 ..mu..R/hr. Radionuclide analysis of offsite soil and sediment samples, as well as above-ground gamma exposure rate measurements defined the spread of contamination around the tailings pile. This spread is greatest toward the east, in the direction of surface water runoff. Calculated concentrations of /sup 226/Ra in all of the holes drilled in the tailngs, based on gamma monitoring data, showed maximum concentrations in the range 100 to 800 pCi/g.

  18. Radiological survey of the inactive uranium-mill tailings at Durango, Colorado

    SciTech Connect (OSTI)

    Haywood, F.F.; Perdue, P.T.; Shinpaugh, W.H.; Ellis, B.S.; Chou, K.D.

    1980-03-01

    Results of a radiological survey of the inactive uranium-mill site at Durango, Colorado, conducted in April 1976, in cooperation with a team from Ford, Bacon and Davis Utah Inc., are presented together with descriptions of the instruments and techniques used to obtain the data. Direct above-ground gamma measurements and analysis of surface soil and sediment samples indicate movement of tailings from the piles toward Lightner Creek on the north and the Animas River on the east side of the piles. The concentration of /sup 226/Ra in the former raffinate pond area is only slightly above the background level. Two structures in Durango were found to contain high concentrations of airborne radon daughters, where tailings are known to have been utilized in construction. Near-background concentrations of radon daughters were found in a well-ventilated building close to the tailings.

  19. Environmental assessment of remedial action at the slick rock Uranium Mill Tailings sites Slick Rock, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section} 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use.

  20. Laboratory evaluation of limestone and lime neutralization of acidic uranium mill tailings solution. Progress report

    SciTech Connect (OSTI)

    Opitz, B.E.; Dodson, M.E.; Serne, R.J.

    1984-02-01

    Experiments were conducted to evaluate a two-step neutralization scheme for treatment of acidic uranium mill tailings solutions. Tailings solutions from the Lucky Mc Mill and Exxon Highland Mill, both in Wyoming, were neutralized with limestone, CaCO/sub 3/, to an intermediate pH of 4.0 or 5.0, followed by lime, Ca(OH)/sub 2/, neutralization to pH 7.3. The combination limestone/lime treatment methods, CaCO/sub 3/ neutralization to pH 4 followed by neutralization with Ca(OH)/sub 2/ to pH 7.3 resulted in the highest quality effluent solution with respect to EPA's water quality guidelines. The combination method is the most cost-effective treatment procedure tested in our studies. Neutralization experiments to evaluate the optimum solution pH for contaminant removal were performed on the same two tailings solutions using only lime Ca(OH)/sub 2/ as the neutralizing agent. The data indicate solution neutralization above pH 7.3 does not significantly increase removal of pH dependent contaminants from solution. Column leaching experiments were performed on the neutralized sludge material (the precipitated solid material which forms as the acidic tailings solutions are neutralized to pH 4 or above). The sludges were contacted with laboratory prepared synthetic ground water until several effluent pore volumes were collected. Effluent solutions were analyzed for macro ions, trace metals and radionuclides in an effort to evaluate the long term effectiveness of attenuating contaminants in sludges formed during solution neutralization. Neutralized sludge leaching experiments indicate that Ca, Na, Mg, Se, Cl, and SO/sub 4/ are the only constituents which show solution concentrations significantly higher than the synthetic ground water in the early pore volumes of long-term leaching studies.

  1. Laboratory measurements of contaminant attenuation of uranium mill tailings leachates by sediments and clay liners

    SciTech Connect (OSTI)

    Serne, R.J.; Peterson, S.R.; Gee, G.W.

    1983-04-01

    We discuss FY82 progress on the development of laboratory tools to aid in the prediction of migration potential of contaminants present in acidic uranium mill tailings leachate. Further, empirical data on trace metal and radionuclide migration through a clay liner are presented. Acidic uranium mill tailings solution from a Wyoming mill was percolated through a composite sediment called Morton Ranch Clay liner. These laboratory columns and subsequent sediment extraction data show: (1) As, Cr, Pb, Ag, Th and V migrate very slowly; (2) U, Cd, Ni, Zn, Fe, Mn and similar transition metals are initially immobilized during acid neutralization but later are remobilized as the tailings solution exhausts the clay liner's acid buffering capacity. Such metals remain immobilized as long as the effluent pH remains above a pH value of 4 to 4.5, but they become mobile once the effluent pH drops below this range; and (3) fractions of the Se and Mo present in the influent tailings solution are very mobile. Possible controlling mechanisms for the pH-dependent immobilization-mobilization of the trace metals are discussed. More study is required to understand the controlling mechanisms for Se and Mo and Ra for which data were not successfully collected. Using several column lengths (from 4.5 to 65 cm) and pore volume residence times (from 0.8 to 40 days) we found no significant differences in contaminant migration rates or types and extent of controlling processes. Thus, we conclude that the laboratory results may be capable of extrapolation to actual disposal site conditions.

  2. Summary report on reprocessing evaluation of selected inactive uranium mill tailings sites

    SciTech Connect (OSTI)

    Not Available

    1983-09-01

    Sandia National Laboratories has been assisting the Department of Energy in the Uranium Mill Tailings Remedial Actions Program (UMTRAP) the purpose of which is to implement the provisions of Title I of Public Law 95-604, Uranium Mill Tailings Radiation Control Act of 1978.'' As part of this program, there was a need to evaluate the mineral concentration of the residual radioactive materials at some of the designated processing sites to determine whether mineral recovery would be practicable. Accordingly, Sandia contracted Mountain States Research and Development (MSRD), a division of Mountain States Mineral Enterprises, to drill, sample, and test tailings at 12 sites to evaluate the cost of and the revenue that could be derived from mineral recovery. UMTRAP related environmental and engineering sampling and support activities were performed in conjunction with the MSRD operations. This summary report presents a brief description of the various activities in the program and of the data and information obtained and summarizes the results. 8 refs., 9 tabs.

  3. Environmental assessment of remedial action at the Mexican Hat uranium mill tailings site, Mexican Hat, Utah. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    This document assesses the environmental impacts of the proposed remedial action at the Mexican Hat uranium mill tailings site located on the Navajo Reservation in southern Utah. The site covers 235 acres and contains 69 acres of tailings and several of the original mill structures. Remedial action must be performed in accordance with standards and with the concurrence of the US Nuclear Regulatory Commission and the Navajo Nation. The proposed action is to stabilize the tailings within the present tailings site by consolidating the tailings and associated contaminated soils into a recontoured pile. A radon barrier of compacted earth would be constructed over the pile, and various erosion control measures would be taken to assure the long-term stability of the pile. The no action alternative is also assessed in this document. 240 refs., 12 figs., 20 tabs.

  4. Environmental assessment of remedial action at the Shiprock uranium mill tailings site, Shiprock, New Mexico: Volume 1, Text

    SciTech Connect (OSTI)

    1984-05-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the shiprock uranium mill tailings site located on the Navajo Indian Reservation, one mile south of Shiprock, New Mexico. The site contains 72 acres of tailings and four of the original mill buildings. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated soils into a recontoured pile. A seven-foot-thick radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Three other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a more remote location. The no action alternative is also assessed. 99 refs., 40 figs., 58 tabs.

  5. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  6. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  7. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document.

  8. Grand Junction, Colorado, Disposal Site Long-Term Surveillance and Maintenance Program Fact Sheet, July 2001

    Office of Legacy Management (LM)

    Grand Junction Disposal Site Uranium ore was processed at the Climax millsite at Grand Junction, Colorado, between 1951 and 1970. The milling operations created process-related waste and tailings, a sandlike material containing radioactive materials and other contaminants. The tailings were an ideal and inexpensive construction material suitable for concrete, mortar, and fill. Accordingly, the tailings were widely used in the Grand Junction area for these purposes. The U.S. Department of Energy

  9. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado

    SciTech Connect (OSTI)

    1995-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  10. Baseline risk assessment for groundwater contamination at the uranium mill tailings site near Monument Valley, Arizona. Draft

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This baseline risk assessment evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site near Monument Valley, Arizona. The tailings and other contaminated material at this site are being relocated and stabilized in a disposal cell at Mexican Hat, Utah, through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The tailings removal is planned for completion by spring 1994. After the tailings are removed, groundwater contamination at the site will continue to be evaluated. This risk assessment is the first document specific to this site for the Groundwater Project. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site.

  11. Survivability of ancient man-made earthen mounds: implications for uranium mill tailings impoundments

    SciTech Connect (OSTI)

    Lindsey, C.G.; Mishima, J.; King, S.E.; Walters, W.H.

    1983-06-01

    As part of a study for the Nuclear Regulatory Commission (NRC), the Pacific Northwest Laboratory (PNL) is investigating long-term stabilization techniques for uranium mill impoundments. Part of this investigation involves the design of a rock armoring blanket (riprap) to mitigate wind and water erosion of the underlying soil cover, which in turn prevents exposure of the tailings to the environment. However, the need for the armoring blanket, as well as the blanket's effectiveness, depends on the stability of the underlying soil cap (radon suppression cover) and on the tailings themselves. Compelling evidence in archaeological records suggests that large man-made earthen structures can remain sound and intact for time periods comparable to those required for the stabilization of the tailings piles if properly constructed. We present archaeological evidence on the existence and survivability of man-made earthen and rock structures through specific examples of such structures from around the world. We also review factors contributing to their survival or destruction and address the influence of climate, building materials, and construction techniques on survivability.

  12. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Maybell, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, contaminated soil, building foundations, and materials associated with the former processing of uranium ore at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further contamination of ground water. One UMTRA Project site is near Maybell, Colorado. Surface cleanup at this site began in 1995 and is scheduled for completion in 1996. The tailings are being stabilized in place at this site. The disposal area has been withdrawn from public use by the DOE and is referred to as the permanent withdrawal area. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from past uranium ore processing activities. The Ground Water Project at this site is in its beginning stages. This report is a site-specific document that will be used to evaluate current and future potential impacts to the public and the environment from exposure to contaminated ground water. The results presented in this document and other evaluations will determine whether any action is needed to protect human health or the environment.

  13. Economic evaluation of inactive uranium mill tailings, Gunnison Site, Gunnison, Colorado

    SciTech Connect (OSTI)

    Teel, J H

    1982-12-01

    Mountain States Research and Development was contracted on March 1, 1981 to make an economic evaluation study at each of 12 abandoned uranium mill tailings sites in the western states. The objective of this work was to obtain the data necessary at each site to determine the possible revenue that could be derived from reprocessing the tailings. To accomplish this objective a drilling and sampling program was established for each site to determine the total amount of tailings and subbase material available for treatment and the amount of recoverable uranium, vanadium and molybdenum. These three metals were selected due to their common occurrence in uranium ores and common extractability in the leaching process. Laboratory leaching was then conducted on the samples obtained to determine the extractability of each of these metals and the optimum plant process to be applied. As the metal contents were generally low and represented mineral that had not been leached during previous processing, the economic evaluation is limited to consideration of the direct capital and operating costs required in connection with processing of each respective site material. Excavating, transportation and disposal of the material from each site in an environmentally acceptable location and manner was not within the scope of this project. It will be necessary to complete a separate study of these areas in order to determine the total costs involved. This report contains the results of the investigations of the Old Rifle Site.

  14. Mathematical simulation of contaminant distribution in and around the uranium mill tailing piles, Riverton, Wyoming

    SciTech Connect (OSTI)

    Narasimhan, T.N.; Tokunaga, T.; White, A.F.; Smith, A.R.

    1983-02-01

    As part of the Research and Development phase of the Uranium Mill Tailings Remedial Action (UMTRA) program, the Lawrence Berkeley Laboratory (LBL) has set itself the goal of explaining the physico-chemical evolution of the Riverton site on the basis of the already collected field data at the site (Tokunaga and Narasimhan, 1982, Smith and Moed, 1982; White et al., 1984). The predictive aspects as well as addressing the question of critical quantity of field data have to be considered during the design phase of the project as a joint effort between the LBL team and the construction engineers. At the present time, LBL is in the process of completing the Research and Development phase of the work. As of this writing, the development of an appropriate set of mathematical models has been completed. The computations of the soil-water regime at the upper tailings surface, involving climatological factors is nearing completion. Computations of chemical transport are still in progress. This paper is devoted to a description of the key mathematical issues, the mathematical models that are needed to address these issues and a discussion of the model results pertaining to the soil water regime at the tailings-atmosphere interface. 11 references, 3 figures.

  15. Management and overview Quality Assurance Program Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1986-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

  16. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section}7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd{sup 3}). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi northeast of the sites on land administered by the Bureau of Land Management (BLM).

  17. Contents of environmental assessments prepared for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This document presents two versions of the outline for the environmental assessments (EAS) to be prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The first displays the basic structure of the assessments; it lists only the titles of sections. The second is a guide to the contents of the assessments which provides, under each title, a brief summary of contents. The outline is intended to comply with the planning requirements (40 CFR Part 1501) and the definitions of terms (40-' CFR Part 1508) established by the Council on Environmental Quality as well as DOE order 5440.lB (Implementation of the National Environmental Policy Act), and compliance with Floodplain/Wetlands Environmental Review Requirements (10 CFR Part 1022). These requirements and definitions are implicitly part of the outline. The outline presented in this document will guide the preparation of EAs. The UMTRA Project EAs will be used in determining whether the DOE should prepare an environmental impact statement or a finding of no significant impact for the actions at each of the sites. If no impact statement is necessary, the environmental assessment for that site will aid the DOE in complying with the National Environmental Policy Act before beginning remedial actions. If an impact statement is needed, the assessment will aid its preparation. These purposes, established by the Council on Environmental Quality in 40 CFR Part 1508.9(a), have guided the construction of the outline presented in this document. Remedial actions at each site will include the cleanup of properties in the vicinity of the tailings sites that have been contaminated by the tailings.

  18. Contents of environmental assessments prepared for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This document presents two versions of the outline for the environmental assessments (EAS) to be prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The first displays the basic structure of the assessments; it lists only the titles of sections. The second is a guide to the contents of the assessments which provides, under each title, a brief summary of contents. The outline is intended to comply with the planning requirements (40 CFR Part 1501) and the definitions of terms (40-` CFR Part 1508) established by the Council on Environmental Quality as well as DOE order 5440.lB (Implementation of the National Environmental Policy Act), and compliance with Floodplain/Wetlands Environmental Review Requirements (10 CFR Part 1022). These requirements and definitions are implicitly part of the outline. The outline presented in this document will guide the preparation of EAs. The UMTRA Project EAs will be used in determining whether the DOE should prepare an environmental impact statement or a finding of no significant impact for the actions at each of the sites. If no impact statement is necessary, the environmental assessment for that site will aid the DOE in complying with the National Environmental Policy Act before beginning remedial actions. If an impact statement is needed, the assessment will aid its preparation. These purposes, established by the Council on Environmental Quality in 40 CFR Part 1508.9(a), have guided the construction of the outline presented in this document. Remedial actions at each site will include the cleanup of properties in the vicinity of the tailings sites that have been contaminated by the tailings.

  19. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Maybell, Colorado

    SciTech Connect (OSTI)

    1995-09-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, building foundations, and materials associated with the former processing of uranium ore at UMTRA sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further contamination of ground water. One UMTRA Project site is near Maybell, Colorado. Surface cleanup at this site is under way and is scheduled for completion in 1996. The tailings are being stabilized in-place at this site. The disposal area has been withdrawn from public use by the DOE and is referred to as the permanent withdrawal area. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from past uranium ore processing activities. The Ground Water Project at this site is in its beginning stages. This report is a site-specific document that will be used to evaluate current and future potential impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the environment. Currently, no points of exposure (e.g. a drinking water well); and no receptors of contaminated ground water have been identified at the Maybell site. Therefore, there are no current human health and ecological risks associated with exposure to contaminated ground water. Furthermore, if current site conditions and land- and water-use patterns do not change, it is unlikely that contaminated ground water would reach people or the ecological communities in the future.

  20. Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    breaks ground on key sediment control project November 5, 2009 Structures will limit flow of sediments toward Rio Grande Los Alamos, New Mexico, November 5, 2009- Crews broke...

  1. Groundwater contamination from an inactive uranium mill tailings pile. 2. Application of a dynamic mixing model

    SciTech Connect (OSTI)

    Narashimhan, T.N.; White, A.F.; Tokunaga, T.

    1986-12-01

    At Riverton, Wyoming, low pH process waters from an abandoned uranium mill tailings pile have been infiltrating into and contaminating the shallow water table aquifer. The contamination process has been governed by transient infiltration rates, saturated-unsaturated flow, as well as transient chemical reactions between the many chemical species present in the mixing waters and the sediments. In the first part of this two-part series the authors presented field data as well as an interpretation based on a static mixing models. As an upper bound, the authors estimated that 1.7% of the tailings water had mixed with the native groundwater. In the present work they present the results of numerical investigation of the dynamic mixing process. The model, DYNAMIX (DYNamic MIXing), couples a chemical speciation algorithm, PHREEQE, with a modified form of the transport algorithm, TRUMP, specifically designed to handle the simultaneous migration of several chemical constituents. The overall problem of simulating the evolution and migration of the contaminant plume was divided into three sub problems that were solved in sequential stages. These were the infiltration problem, the reactive mixing problem, and the plume-migration problem. The results of the application agree reasonably with the detailed field data. The methodology developed in the present study demonstrates the feasibility of analyzing the evolution of natural hydrogeochemical systems through a coupled analysis of transient fluid flow as well as chemical reactions. It seems worthwhile to devote further effort toward improving the physicochemical capabilities of the model as well as to enhance its computational efficiency.

  2. Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site`s tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site.

  3. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  4. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  5. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 2, Geology report

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This report presents geologic considerations that are pertinent to the Remedial Action Plan for Slick Rock mill tailings. Topics covered include regional geology, site geology, geologic stability, and geologic suitability.

  6. Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    breaks ground on key sediment control project November 5, 2009 Structures will limit flow of sediments toward Rio Grande Los Alamos, New Mexico, November 5, 2009- Crews broke ground this week on one of two engineered structures in a Los Alamos National Laboratory environmental project to reduce the flow of sediments down two canyons toward the Rio Grande. Called "grade-control" structures, the approximately $2 million features are up to eight feet high and made of rocks packed tightly

  7. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Shiprock, New Mexico. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This baseline risk assessment at the former uranium mill tailings site near Shiprock, New Mexico, evaluates the potential impact to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an on-site disposal cell in 1986 through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. There are no domestic or drinking water wells in the contaminated ground water of the two distinct ground water units: the contaminated ground water in the San Juan River floodplain alluvium below the site and the contaminated ground water in the terrace alluvium area where the disposal cell is located. Because no one is drinking the affected ground water, there are currently no health or environmental risks directly associated with the contaminated ground water. However, there is a potential for humans, domestic animals, and wildlife to the exposed to surface expressions of ground water in the seeps and pools in the area of the San Juan River floodplain below the site. For these reasons, this risk assessment evaluates potential exposure to contaminated surface water and seeps as well as potential future use of contaminated ground water.

  8. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  9. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand...

    Office of Environmental Management (EM)

    ... with more desirable salt-tolerant species if ... use environmentally preferred fuels and energy sources. ... probability of such an accident, DOE does not believe ...

  10. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand...

    Office of Environmental Management (EM)

    ... Compliance testing of the scrubber and dryers must be performed within 180 days of the ... The site is located within a region that has a dry to arid continental climate and an ...

  11. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand...

    Office of Environmental Management (EM)

    ... moisture by weight, have an in-place dry density of 86.3 pounds per cubic foot (Cell ... annual emissions limits for the yellowcake dryers and vanadium circuit scrubber. ...

  12. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site near Gunnison, Colorado. Final

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to their water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land.

  13. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  14. DESIGN, PERFORMANCE, AND SUSTAINABILITY OF ENGINEERED COVERS FOR URANIUM MILL TAILINGS

    SciTech Connect (OSTI)

    Waugh, W. Jody

    2004-04-21

    Final remedies at most uranium mill tailings sites include engineered covers designed to contain metals and radionuclides in the subsurface for hundreds of years. Early cover designs rely on compacted soil layers to limit water infiltration and release of radon, but some of these covers inadvertently created habitats for deep-rooted plants. Root intrusion and soil development increased the saturated hydraulic conductivity several orders of magnitude above design targets. These covers may require high levels of maintenance to sustain long-term performance. Relatively low precipitation, high potential evapotranspiration, and thick unsaturated soils favor long-term hydrologic isolation of buried waste at arid and semiarid sites. Later covers were designed to mimic this natural soil-water balance with the goal of sustaining performance with little or no maintenance. For example, the cover for the Monticello, Utah, Superfund site relies on a thick soil-sponge layer overlying a sand-and-gravel capillary barrier to store precipitation while plants are dormant and on native vegetation to dry the soil sponge during the growing season. Measurements of both off-site caisson lysimeters and a large 3-ha lysimeter built into the final cover show that drainage has been well below a U.S. Environmental Protection Agency target of less than 3.0 mm/yr. Our stewardship strategy combines monitoring precursors to failure, probabilistic riskbased modeling, and characterization of natural analogs to project performance of covers for a range of possible future environmental scenarios. Natural analogs are needed to understand how ecological processes will influence cover performance, processes that cannot be predicted with short-term monitoring and existing numerical models.

  15. Review and analysis of proposed EPA groundwater standards for the UMTRA Project. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all sites. On September 24, 1987, the EPA published proposed standards in response to the remand. This Summary Report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project as well as a discussion of the DOE's position on the proposed standards. This report is accompanied by a detailed Technical Report and Appendices which provide supporting information and analyses. This Summary Report results from a study undertaken to: determine the impact of the proposed standards on the UMTRA Project; and recommend provisions for the implementation of the final standards that will minimize adverse impact to the conduct of the UMTRA Project while ensuring protection of human health and the environment. Specifically, the following were considered: the flexibility of the proposed standards; interpretations of the proposed standards; the extent of aquifer restoration that may be required to implement the proposed standards at each site; the costs of aquifer restoration; and design changes necessary to meet the standards.

  16. EA-1155: Ground-water Compliance Activities at the Uranium Mill Tailings Site, Spook, Wyoming

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to comply with the Environmental Protection Agency's ground-water standards set forth in 40 CFR 192 at the Spook, Wyoming Uranium Mill...

  17. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix D. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This appendix is an assessment of the present conditions of the inactive uranium mill site near Mexican Hat, Utah. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan. Plan is to characterize the conditions at the mill and tailings site so that the Remedial Action Contractor may complete final designs of the remedial action.

  18. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    SciTech Connect (OSTI)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  19. U.S. Department of Energy at Grand Junction 2003 Annual Inspection⎯Monticello, Utah

    Office of Legacy Management (LM)

    at Grand Junction 2003 Annual Inspection⎯Monticello, Utah November 2003 Page 1 2003 Annual Inspection of the Monticello Mill Tailings (USDOE) and Monticello Radioactively Contaminated Properties Sites Summary The Monticello site, which includes the U.S. Department of Energy (DOE) Monticello Mill Tailings Site (MMTS) and the Monticello Radioactively Contaminated Properties site, was inspected September 23-25, 2003. A follow-up inspection of the Soil and Sediment properties was conducted on

  20. Survey of Radionuclide Distributions Resulting from the Church Rock, New Mexico, Uranium Mill Tailings Pond Dam Failure

    SciTech Connect (OSTI)

    Weimer, W. C.; Kinnison, R. R.; Reeves, J. H.

    1981-12-01

    An intensive site survey and on-site analysis program were conducted to evaluate the distribution of four radionucliGes in the general vicinity of Gallup, New Mexico, subsequent to the accidental breach of a uranium mill tailings pond dam and the release of a large quantity of tailings pond materials. The objective of this work was to determine the distribution and concentration levels of {sup 210}Pb, {sup 226}Ra, {sup 230}Th, and {sup 238}U in the arroyo that is immediately adjacent to the uranium tailings pond (pipeline arroyo) and in the Rio Puerco arroyo into which the pipeline arroyo drains. An intensive survey between the United Nuclear Corporation (UNC) Church Rock Mill site and the New Mexico-Arizona state border was performed. Sampling locations were established at approximately 500-ft intervals along the arroyo. During the weeks of September 24 through October 5, 1979, a series of samples was collected from alternate sampling locations along the arroyo. The purpose of this collection of samples and their subsequent analysis was to provide an immediate evaluation of the extent and the levels of radioactive contamination. The data obtained from this extensive survey were then compared to action levels which had been proposed by the Nuclear Regulatory Commission and were adapted by the New Mexico Environmental Improvement Division (NMEID) for {sup 230}Th and {sup 226}Ra concentrations that would require site cleanup. The Pacific Northwest Laboratory/Nuclear Regulatory Commission mobile laboratory van was on-site at the UNC Church Rock Mill from September 22, 1979, through December 13, 1979, and was manned by one or more PNL personnel for all but four weeks of this time period. Approximately 1200 samples associated with the Rio Puerco survey were analyzed 1n the laboratory. An additional 1200 samples related to the Rio Puerco cleanup operations which the United Nuclear Corporation was conducting were analyzed on-site in the mobile laboratory. The purpose of

  1. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Lakeview, Oregon. Revision 2

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the UMTRA Project site near Lakeview, Oregon, was completed in 1989. The mill operated from February 1958 to November 1960. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Ecological risks to plants or animals may result from exposure to surface water and sediment that have received contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the ecological environment.

  2. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    SciTech Connect (OSTI)

    2013-11-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  3. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Rifle, Colorado. Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase 1) and the Ground Water Project (Phase 2). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment.

  4. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  5. Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming

    SciTech Connect (OSTI)

    1987-06-01

    The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

  6. Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards.

  7. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Rifle, Colorado. Revision 2

    SciTech Connect (OSTI)

    1996-02-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment. Human health risk may result from exposure to ground water contaminated from uranium ore processing. Exposure could occur from drinking water obtained from a well placed in the areas of contamination. Furthermore, environmental risk may result from plant or animal exposure to surface water and sediment that have received contaminated ground water.

  8. Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995. Revision 1

    SciTech Connect (OSTI)

    1995-12-01

    As required by the Romer-Twining Agreement of 1990, the US Department of Energy (DOE) has prepared this annual economic impact study for the state of Colorado. This report assesses the economic impacts related to the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project in Colorado during the state fiscal year (FY) between 1 July 1994 and 30 June 1995. To estimate net economic benefit, employment, salaries and wages, and other related economic benefits are discussed, quantified, and then compared to the state`s 10 percent share of the remedial action costs. Actual data obtained from sites currently undergoing remedial action were used as the basis for analyses. If data were not available, estimates were used to derive economic indicators. This study describes the types of employment associated with the UMTRA Project and estimates of the numbers of people employed by UMTRA Project subcontractors in Colorado during state FY 1995. Employment totals are reported in estimated average annual jobs; however, the actual number of workers at the site fluctuates depending on weather and on the status of remedial action activities. In addition, the actual number of people employed on the Project during the year may be higher than the average annual employment reported due to the temporary nature of some of the jobs.

  9. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Lakeview, Oregon. Revision 1

    SciTech Connect (OSTI)

    1995-12-01

    Surface cleanup at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Lakeview, Oregon was completed in 1989. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Ecological risks to plants or animals may result from exposure to surface water and sediment that have received contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the ecological environment.

  10. Performance Evaluation of the Engineered Cover at the Lakeview, Oregon, Uranium Mill Tailings Site

    SciTech Connect (OSTI)

    Waugh, J.; Smith, G.; Danforth, B.; Gee, G.; Kothari, V.; Pauling, T.

    2007-07-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is evaluating the performance of disposal cell covers at LM sites and exploring ways to enhance their sustainability. The cover of the Lakeview, Oregon, disposal cell relies on a compacted soil layer (CSL) to limit radon escape and water percolation into underlying tailings. The design created habitat favorable for growth of woody plants that sent roots through the CSL. The mean saturated hydraulic conductivity (K{sub sat}) of the CSL, measured at 17 locations, was 3.0 x 10{sup -5} cm s{sup -1}, 300 times greater than the design target. The highest K{sub sat} values were measured near the top of the CSL at locations both with and without roots; the lowest K{sub sat} values were measured deeper in the CSL. Water flux meters (WFMs) installed in 2005 to directly measure percolation flux show significant percolation through the cover. Three WMFs began recording percolation in mid-November, 7 days after the start of a prolonged precipitation event, and continued until early June 2006. Percolation flux during this period ranged between 3.1 x 10{sup -5} and 8.5 x 10{sup -5} cm s{sup -1}. The cumulative percolation was greater than total precipitation during the period, probably because of a water-harvesting effect. The WFMs were strategically placed in down-gradient positions on the cover top slope where water likely accumulated in a sand drainage layer. Routine monitoring at Lakeview shows that the ground water remains protected. LM plans to evaluate potential effects of high percolation rates in covers to ensure that disposal cells remain protective for the long term. (authors)

  11. Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

    SciTech Connect (OSTI)

    2012-03-01

    This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

  12. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    SciTech Connect (OSTI)

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

  13. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future.

  14. Monitoring the Performance of an Alternative Landfill Cover at the Monticello, Utah, Uranium Mill Tailings Disposal Site

    SciTech Connect (OSTI)

    Waugh, W.J.; Kastens, M.K.; Sheader, L.R.L.; Benson, C.H.; Albright, W.H.; Mushovic, P.S.

    2008-07-01

    The U.S. Department of Energy Office of Legacy Management (DOE) and the U.S. Environmental Protection Agency (EPA) collaborated on the design and monitoring of an alternative cover for the Monticello uranium mill tailings disposal cell, a Superfund site in southeastern Utah. Ground-water recharge is naturally limited at sites like Monticello where thick, fine-textured soils store precipitation until evaporation and plant transpiration seasonally return it to the atmosphere. The cover at Monticello uses local soils and a native plant community to mimic the natural soil water balance. The cover is fundamentally an evapotranspiration (ET) design with a capillary barrier. A 3-hectare drainage lysimeter was embedded in the cover during construction of the disposal cell in 2000. The lysimeter consists of a geo-membrane liner below the capillary barrier that directs percolation water to a monitoring system. Soil water storage is determined by integration of point water content measurements. Meteorological parameters are measured nearby. Plant cover, shrub density, and leaf area index (LAI) are monitored annually. The cover performed well over the 7-year monitoring period (2000-2007). The cumulative percolation was 4.2 mm (0.6 mm yr{sup -1}), satisfying an EPA goal of an average percolation of <3.0 mm yr{sup -1}. Almost all percolation can be attributed to the exceptionally wet winter and spring of 2004-2005 when soil water content slightly exceeded the water storage capacity of the cover. The diversity, percent cover, and LAI of vegetation increased over the monitoring period, although the density of native shrubs that extract water from deeper in the cover has remained less than revegetation targets. DOE and EPA are applying the monitoring results to plan for long-term surveillance and maintenance and to evaluate alternative cover designs for other waste disposal sites. (authors)

  15. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    1995-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project, and the Ground Water Project. For the UMTRA Project site located near Naturita, Colorado, phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado. The surface cleanup will reduce radon and other radiation emissions from the former uranium processing site and prevent further site-related contamination of ground water. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health and the environment, and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water or surface water that has mixed with contaminated ground water. Therefore, a risk assessment was conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  16. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona: Phase 2, Construction, Subcontract documents: Appendix E, final report. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    This appendix discusses Phase II construction and subcontract documents uranium mill site near Tuba City, Arizona. It contains the bid schedule, special conditions, specifications, and subcontract drawings.

  17. EIS-0126: Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this EIS to assess the environmental impacts of remediating the residual radioactive materials left from the inactive uranium processing site and associated properties located in Grand Junction, Colorado.

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Remedial action selection report, Appendix B

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    The Slick Rock uranium mill tailings sites are located near the small town of Slick Rock, in San Miguel County, Colorado. There are two designated UMTRA sites at Slick Rock, the Union Carbide (UC) site and the North Continent (NC) site. Both sites are adjacent to the Dolores River. The UC site is approximately 1 mile (mi) [2 kilometers (km)] downstream of the NC site. Contaminated materials cover an estimated 55 acres (ac) [22 hectares (ha)] at the UC site and 12 ac (4.9 ha) at the NC site. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 620, 000 cubic yards (yd{sup 3}) [470,000 cubic meters (m{sup 3})]. In addition to the contamination at the two processing site areas, four vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into groundwater.

  19. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  20. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix E. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This document provides Appendix E of the Remedial Action Plan (RAP) presented in 1988 for the stabilization of the inactive uranium mill tailings at the Mexican Hat, Utah site. The RAP was developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. The RAP has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action.

  1. Environmental Audit of the Grand Junction Projects Office

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  2. Final Environmental Assessment of remedial action at the Falls City uranium mill tailings site, Falls City, Texas

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    This environmental assessment (EA) is prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts that their actions may have on the environment. This EA examines the short- and long-term effects of the DOE`s proposed remedial action for the Falls City tailings site. The no action alternative is also examined. The DOE will use the information and analyses presented here to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an EIS will be prepared. If the impacts are not judged to be significant, the DOE will issue an official ``Finding of No Significant Impact`` and implement the proposed action.

  3. Evaluation of Background Concentrations of Contaminants in an Unusual Desert Arroyo Near a Uranium Mill Tailings Disposal Cell - 12260

    SciTech Connect (OSTI)

    Bush, Richard P.; Morrison, Stan J.

    2012-07-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages 27 sites that have groundwater containing uranium concentrations above background levels. The distal portions of the plumes merge into background groundwater that can have 50 μg/L or more uranium. Distinguishing background from site-related uranium is often problematic, but it is critical to determining if remediation is warranted, establishing appropriate remediation goals, and evaluating disposal cell performance. In particular, groundwater at disposal cells located on the upper Cretaceous Mancos Shale may have relatively high background concentrations of uranium. Elevated concentrations of nitrate, selenium, and sulfate accompany the uranium. LM used geologic analogs and uranium isotopic signatures to distinguish background groundwater from groundwater contaminated by a former uranium processing site. The same suite of contaminants is present in groundwater near former uranium processing sites and in groundwater seeps emanating from the Mancos Shale over a broad area. The concentrations of these contaminants in Many Devils Wash, located near LM's Shiprock disposal cell, are similar to those in samples collected from many Mancos seeps, including two analog sites that are 8 to 11 km from the disposal cell. Samples collected from Many Devils Wash and the analog sites have high AR values (about 2.0)-in contrast, groundwater samples collected near the tailings disposal cell have AR values near 1.0. These chemical signatures raise questions about the origin of the contamination seeping into Many Devils Wash. (authors)

  4. Winners Announced for the NNSA Grand Challenge Competition

    Broader source: Energy.gov [DOE]

    Clark Atlanta University students' rocket tail component for Additive Manufacturing won the NNSA student Grand Challenge Competition.

  5. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  6. Ground water protection strategy for the Uranium Mill Tailings Site at Green River, Utah. Final, Revision 2, Version 5: Appendix E to the remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Green River, Utah

    SciTech Connect (OSTI)

    1995-09-01

    The purpose of this appendix is to provide a ground water protection strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site at Green River, Utah. Compliance with the US Environmental Protection Agency (EPA) ground water protection standards will be achieved by applying supplemental standards (40 CFR {section} 192.22(a); 60 FR 2854) based on the limited use ground water present in the uppermost aquifer that is associated with widespread natural ambient contamination (40 CFR {section} 192.11(e); 60 FR 2854). The strategy is based on new information, including ground water quality data collected after remedial action was completed, and on a revised assessment of disposal cell design features, surface conditions, and site hydrogeology. The strategy will result in compliance with Subparts A and C of the EPA final ground water protection standards (60 FR 2854). The document contains sufficient information to support the proposed ground water protection strategy, with monitor well information and ground water quality data included as a supplement. Additional information is available in the final remedial action plan (RAP) (DOE, 1991a), the final completion report (DOE, 1991b), and the long-term surveillance plan (LTSP) (DOE, 1994a).

  7. Moab Project Continues Progress on Tailings Removal with Contract

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transition | Department of Energy Progress on Tailings Removal with Contract Transition Moab Project Continues Progress on Tailings Removal with Contract Transition December 27, 2012 - 12:00pm Addthis Laborers place a disposable liner in a tailings container. Laborers place a disposable liner in a tailings container. MOAB, Utah - The Moab mill tailings removal project in Utah ended the year having shipped more than 35 percent of the total 16 million tons of uranium mill tailings off-site.

  8. Remedial Action Plan and Site design for stabilization of the inactive Uranium Mill Tailings sites at Slick Rock, Colorado: Revision 1. Remedial action selection report, Attachment 2, geology report, Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final

    SciTech Connect (OSTI)

    1995-09-01

    The Slick Rock uranium mill tailings sites are located near the small community of Slick Rock, in San Miguel County, Colorado. There are two designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites at Slick Rock: the Union Carbide site and the North Continent site. Both sites are adjacent to the Dolores River. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 621,000 cubic yards (475,000 cubic meters). In addition to the contamination at the two processing site areas, 13 vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into ground water. Pursuant to the requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC {section}7901 et seq.), the proposed remedial action plan (RAP) will satisfy the final US Environmental Protection Agency (EPA) standards in 40 CFR Part 192 (60 FR 2854) for cleanup, stabilization, and control of the residual radioactive material (RRM) (tailings and other contaminated materials) at the disposal site at Burro Canyon. The requirements for control of the RRM (Subpart A) will be satisfied by the construction of an engineered disposal cell. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/weaterborne materials to a permanent repository at the Burro Canyon disposal site. The site is approximately 5 road mi (8 km) northeast of the mill sites on land recently transferred to the DOE by the Bureau of Land Management.

  9. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    SciTech Connect (OSTI)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years.

  10. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rio Grande Rio Grande In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its...

  11. Grand Challenges

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Challenges Grand Challenges Our goals to live a sustainable future LANL stakeholders TA-21 cleanup activities water on LANL land Collaborate with our stakeholders and tribal...

  12. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    SciTech Connect (OSTI)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  13. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    SciTech Connect (OSTI)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney Disposal Site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  14. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rio Grande Rio Grande In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its flood plain. August 1, 2013 river bank Banks of the Rio Grande Groundwater at LANL discharges to springs along the Rio Grande. Stream flow resulting from heavy storms and snowmelt also has the potential to reach the Rio Grande. RELATED IMAGES http://farm3.staticflickr.com/2818/9628464665_3a972e1387_t.jpg Enlarge

  15. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 2, Geology report: Appendix B, Preliminary final

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    Detailed investigations of geologic, geomorphic, and seismic conditions at the Burro Canyon site were conducted by the US Department of Energy (DOE) as a disposal site for the tailings at two processing sites near the Slick Rock, Colorado, post office. The purposes of these studies are basic site characterization and identification of potential geologic hazards that could affect long-term site stability. Subsequent engineering studies (e.g., analyses of hydrologic and liquefaction hazards) used the data developed in these studies. The geomorphic analysis was employed in the design of effective erosion protection. Studies of the regional and local seismotectonic setting, which included a detailed search for possible capable faults within a 65-km radius of the site, provided the basis for seismic design parameters.

  16. Supplemental Modeling and Analysis Report, Atlas Corporation Moab Mill, Moab, Utah

    SciTech Connect (OSTI)

    Easterly, CE

    2001-11-05

    The purpose of this report is to provide additional numerical modeling and data evaluation for the Atlas tailings pile near Moab, Utah. A previous report (Tailings Pile Seepage Model: The Atlas Corporation Moab Mill, Moab, Utah, January 9, 1998) prepared for the Nuclear Regulatory Commission (NRC) by Oak Ridge National Laboratory/Grand Junction (ORNL/GJ) presented the results of steady-state modeling of water flow and subsequent discharge to the underlying groundwater system. At the request of the Fish and Wildlife Service (FWS), this model was expanded to evaluate the impact of drainage from the tailings pile in addition to recharge from precipitation in a transient mode simulation. In addition, the FWS requested transient simulations of contaminant transport in the alluvial aquifer. Subsequently, NRC requested an evaluation of additional hydrologic issues related to the results presented in the Tailings Pile Seepage Model (ORNL/GJ 1998a) and the Limited Groundwater Investigation (ORNL/GJ 1998b). Funding for the report was provided by the U.S. Department of Energy. The following section lists the individual tasks with subsequent sections providing the results. A map for the Atlas Moab Mill site is presented in Fig. 1.1.

  17. EIS-0355: Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    EIS-0355: Record of Decision Remediation of the Moab Uranium Mill Tailings, Grand and San ... in the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan ...

  18. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailing site Maybell, Colorado. Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final report

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The U.S. Environmental Protection Agency (EPA) has established health and environmental regulations to correct and prevent ground water contamination resulting from former uranium processing activities at inactive uranium processing sites (40 CFR Part 192 (1993)) (52 FR 36000 (1978)). According to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.), the U.S. Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has decided that each assessment will include information on hydrogeologic site characterization. The water resources protection strategy that describes the proposed action compliance with the EPA ground water protection standards is presented in Attachment 4, Water Resources Protection Strategy. Site characterization activities discussed in this section include the following: (1) Definition of the hydrogeologic characteristics of the environment, including hydrostratigraphy, aquifer parameters, areas of aquifer recharge and discharge, potentiometric surfaces, and ground water velocities. (2) Definition of background ground water quality and comparison with proposed EPA ground water protection standards. (3) Evaluation of the physical and chemical characteristics of the contaminant source and/or residual radioactive materials. (4) Definition of existing ground water contamination by comparison with the EPA ground water protection standards. (5) Description of the geochemical processes that affect the migration of the source contaminants at the processing site. (6) Description of water resource use, including availability, current and future use and value, and alternate water supplies.

  19. Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  20. Final report of the radiological release survey of Building 19 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 19 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  1. Final report of the radiological release survey of Building 54 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 54 and the underlying soil were found not to be radiologically contaminated, and can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual release report for each GJO building.

  2. Final report of the radiological release survey of Building 29 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailing during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 29 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  3. DOE - Office of Legacy Management -- Lowman Mill Site - ID 01

    Office of Legacy Management (LM)

    Lowman Mill Site - ID 01 Site ID (CSD Index Number): ID.01 Site Name: Lowman Mill Site Site Summary: Site Link: External Site Link: Lowman, Idaho, Disposal Site Alternate Name(s): Lowman Mill Site Uranium Mill in Lowman Alternate Name Documents: Location: Lowman, Idaho Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site Eligibility Determination Documents:

  4. Rio Grande

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its flood plain. August 1, ...

  5. Grand Challenges

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Challenges Grand Challenges Our goals to live a sustainable future LANL stakeholders TA-21 cleanup activities water on LANL land Collaborate with our stakeholders and tribal governments to ensure that LANL's impact on the environment is as low as reasonably achievable Remove or stabilize pollutants from the Manhattan Project and Cold War eras Protect water resource quality and reduce water use Stormwater drainage at LANL LANL land waste workers at LANL Eliminate industrial emissions,

  6. DOE Signs Decision to Move Moab Tailings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision to Move Moab Tailings DOE Signs Decision to Move Moab Tailings September 14, 2005 - 10:23am Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today announced that a Record of Decision (ROD) clearing the way for the removal of 11.9 million tons of radioactive Uranium Mill Tailings from the banks the Colorado River in Utah has been signed. Under the Moab Uranium Mill Tailings Remedial Action Project Site Record of Decision, the tailings will be moved, predominately by

  7. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  8. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  9. DOE - Office of Legacy Management -- Rifle Mill Site - CO 0-11

    Office of Legacy Management (LM)

    Rifle Mill Site - CO 0-11 FUSRAP Considered Sites Site: Rifle Mill Site (CO.0-11 ) Licensed to DOE for long-term custody and managed by the Office of Legacy Management. Designated Name: Old Rifle, Colorado, Processing Site; New Rifle, Colorado, Processing Site Alternate Name: Rifle Mill Site; New Uranium Mill in Rifle, Old Uranium Mill in Rifle Location: Rifle, Colorado Evaluation Year: Site Operations: Site Disposition: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site.

  10. Final report of the radiological release survey of Building 30B at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Krauland, P.A.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 30B and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  11. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedial action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.

  12. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate the facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.

  13. DOE - Office of Legacy Management -- Edgemont Mill Site - SD 01

    Office of Legacy Management (LM)

    Edgemont Mill Site - SD 01 FUSRAP Considered Sites Site: Edgemont Mill Site (SD.01) Licensed to DOE for long-term custody and managed by the Office of Legacy Management Designated Name: Edgemont, South Dakota, Disposal Site Alternate Name: Edgemont Mill Site Ore Buying Station at Edgemont Location: Edgemont, South Dakota Evaluation Year: Site Operations: Site Disposition: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II site Radioactive Materials Handled: Primary Radioactive

  14. DOE - Office of Legacy Management -- Monticello Mill Site - UT 03

    Office of Legacy Management (LM)

    Mill Site - UT 03 FUSRAP Considered Sites Site: Monticello Mill Site (UT.03) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monticello, Utah, Disposal and Processing Sites Documents Related to Monticello Mill Site Monticello Mill Tailings Site Operable Unit III Interim Remedial Action Progress Report July 1999-July 2000.

  15. Cassie Mills

    Broader source: Energy.gov [DOE]

    Cassie Mills is a communications associate in the Advanced Manufacturing Office in the Office of Energy Efficiency and Renewable Energy.

  16. Moab Reaches 40-Percent Mark in Tailings Removal

    Broader source: Energy.gov [DOE]

    MOAB, Utah – The Moab Uranium Mill Tailings Remedial Action Project had a productive year, despite continued budget constraints and a first-ever, three-month curtailment of shipping operations last winter.

  17. Work plan for ground water elevation data recorder/monitor well injection at Grand Junction, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-07-18

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River. Data collection objectives (DCO) identify reasons for collecting data. The following are DCOs for the Grand Junction ground water elevation data recorder/monitor well installation project: long-term continuous ground water level data and periodic ground water samples will be collected to better understand the relationship between surface and ground water at the site; water level and water quality data will eventually be used in future ground water modeling to more firmly establish boundary conditions in the vicinity of the Grand Junction processing site; modeling results will be used to demonstrate and document the potential remedial alternative of natural flushing.

  18. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  19. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect (OSTI)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  20. DOE - Office of Legacy Management -- Ambrosia Lake Mill Site - NM 0-01

    Office of Legacy Management (LM)

    Ambrosia Lake Mill Site - NM 0-01 FUSRAP Considered Sites Site: Ambrosia Lake Mill Site (NM.0-01) Licensed to DOE for long-term custody and managed by the Office of Legacy Management Designated Name: Ambrosia Lake, New Mexico, Disposal Site Alternate Name: Ambrosia Lake Mill Site Uranium Mill in Ambrosia Lake Location: McKinley County, New Mexico Evaluation Year: Site Operations: Site Disposition: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site Radioactive Materials Handled:

  1. DOE - Office of Legacy Management -- Falls City Mill Site - TX 04

    Office of Legacy Management (LM)

    Mill Site - TX 04 FUSRAP Considered Sites Site: Falls City Mill Site (TX.04 ) Licensed to DOE for long-term custody and managed by the Office of Legacy Management. Designated Name: Falls City, Texas, Disposal Site Alternate Name: Falls City Mill Site Uranium Mill in Falls City Location: Karnes County, Texas Evaluation Year: Site Operations: Site Disposition: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site Radioactive Materials Handled: Primary Radioactive Materials Handled:

  2. DOE - Office of Legacy Management -- Gunnison Mill Site - CO 0-06

    Office of Legacy Management (LM)

    Gunnison Mill Site - CO 0-06 Site ID (CSD Index Number): CO.0-06 Site Name: Gunnison Mill Site Site Summary: Site Link: Gunnison, Colorado, Processing Site External Site Link: Alternate Name(s): Gunnison Mill Site Uranium Mill in Gunnison Alternate Name Documents: Location: Gunnison, Colorado Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site Eligibility

  3. DOE - Office of Legacy Management -- Maybell Mill Site - CO 0-07

    Office of Legacy Management (LM)

    Maybell Mill Site - CO 0-07 Site ID (CSD Index Number): CO.0-07 Site Name: Maybell Mill Site Site Summary: Site Link: Maybell, Colorado, Disposal Site External Site Link: Alternate Name(s): Maybell Mill Site Uranium Mill in Maybell Alternate Name Documents: Location: Moffat County, Colorado Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site. Eligibility

  4. DOE - Office of Legacy Management -- Mexican Hat Mill Site - UT 0-02A

    Office of Legacy Management (LM)

    Mill Site - UT 0-02A Site ID (CSD Index Number): UT.0-02A Site Name: Mexican Hat Mill Site Site Summary: Site Link: Mexican Hat, Utah, Disposal Site External Site Link: Alternate Name(s): Mexican Hat Mill Site Uranium Mill in Mexican Hat Alternate Name Documents: Location: Mexican Hat, Utah, Navajo Nation Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site

  5. DOE - Office of Legacy Management -- Monument Valley Mill Site - AZ 0-01

    Office of Legacy Management (LM)

    Monument Valley Mill Site - AZ 0-01 FUSRAP Considered Sites Site: Monument Valley Mill Site (AZ.0-01) Licensed to DOE for long-term custody and managed by the Office of Legacy Management Designated Name: Monument Valley, Arizona, Processing Site Alternate Name: Monument Valley Mill Site Uranium Mill in Monument Valley Location: Navajo Nation, northeastern Arizona Evaluation Year: Site Operations: Site Disposition: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site Radioactive

  6. DOE - Office of Legacy Management -- Riverton Mill Site - WY 0-04

    Office of Legacy Management (LM)

    Mill Site - WY 0-04 Site ID (CSD Index Number): WY.0-04 Site Name: Riverton Mill Site Site Summary: Site Link: Riverton, Wyoming, Processing Site External Site Link: Alternate Name(s): Riverton Mill Site Uranium Mill in Riverton Alternate Name Documents: Location: Riverton, Wyoming, Wind River Indian Reservation Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title

  7. DOE - Office of Legacy Management -- Shiprock Mill Site - NM 0-04

    Office of Legacy Management (LM)

    Shiprock Mill Site - NM 0-04 Site ID (CSD Index Number): NM.0-04 Site Name: Shiprock Mill Site Site Summary: Site Link: Shiprock Disposal, New Mexico, Site External Site Link: Alternate Name(s): Shiprock Mill Site Uranium Mill at Shiprock Alternate Name Documents: Location: Shiprock, New Mexico, Navajo Nation Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I

  8. EIS-0355: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The ... of the mill tailings at Crescent Junction, Utah, using rail transportation, and ...

  9. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soil beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  10. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  11. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  12. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1 was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  13. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  14. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soil beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  15. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    SciTech Connect (OSTI)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  16. DOE - Office of Legacy Management -- Green River Mill Site - UT 0-01

    Office of Legacy Management (LM)

    Green River Mill Site - UT 0-01 Site ID (CSD Index Number): UT.0-01 Site Name: Green River Mill Site Site Summary: Site Link: Green River, Utah, Disposal Site External Site Link: Alternate Name(s): Green River Mill Site Alternate Name Documents: Location: Green River, Utah Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site Eligibility Determination

  17. DOE - Office of Legacy Management -- Lakeview Mill - OR 0-01

    Office of Legacy Management (LM)

    Lakeview Mill - OR 0-01 Site ID (CSD Index Number): OR.0-01 Site Name: Lakeview Mill Site Summary: Site Link: Lakeview, Oregon, Processing Site External Site Link: Alternate Name(s): Lakeview Mill Alternate Name Documents: Location: Lakeview, Oregon Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site Eligibility Determination Documents: Radiological Surveys

  18. DOE - Office of Legacy Management -- Naturita Mill Site - CO 0-08

    Office of Legacy Management (LM)

    Naturita Mill Site - CO 0-08 Site ID (CSD Index Number): CO.0-08 Site Name: Naturita Mill Site Site Summary: Site Link: Naturita, Colorado, Processing Site External Site Link: Alternate Name(s): Naturita Mill Site Alternate Name Documents: Location: Naturita, Colorado Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I site. Eligibility Determination Documents:

  19. Ionfab Mill

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oxford Ionfab System 300+ Ion Mill For questions concerning this machines capabilities, please contact Varshni Singh, at 578-0248. ionfab.jpg (60579 bytes) Removal of metallic patterns from a surface can be performed evenly with this inert gas ion beam system, which uses a projected Ar ion beam to sputter etch the surface of a six inch wafer at the users choice of angle and rotation speed. The Ionfab 300+ can allow researchers to investigate thin film structures with vertical or angled side

  20. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 6, Supplemental standard for Durango processing site. Revised final report

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    Excavation control to the 15 pCi/g radium-226 (Ra-226) standard at certain areas along the Animas River on the Durango Site would require extensive engineering and construction support. Elevated Ra-226 concentrations have been encountered immediately adjacent to the river at depths in excess of 7 feet below the present river stage. Decontamination to such depths to ensure compliance with the EPA standards will, in our opinion, become unreasonable. This work does not appear to be in keeping with the intent of the standards. Because the principal reason for radium removal is reduction of radon daughter concentrations (RDC) in homes to be built onsite, and because radon produced at depth will be attenuated in clean fill cover before entering such homes, it is appropriate to calculate the depth of excavation needed under a home to reduce RDC to acceptable levels. Potential impact was assessed through radon emanation estimation, using the RAECOM computer model. Elevated Ra-226 concentrations were encountered during final radium excavation of the flood plain below the large tailings pile, adjacent to the slag area. Data from 7 test pits excavated across the area were analyzed to provide an estimate of the Ra-226 concentration profile. Results are given in this report.

  1. EIS-0355: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, ...

  2. DOE - Office of Legacy Management -- Grand Junction Sites

    Office of Legacy Management (LM)

    Grand Junction Sites Grand Junction Sites gjmap Grand Junction Disposal Site Grand Junction Processing Site Grand Junction Site Contact Us

  3. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  4. White Tail | Open Energy Information

    Open Energy Info (EERE)

    Tail Jump to: navigation, search Name White Tail Facility White Tail Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exelon Wind Developer...

  5. Biomass torrefaction mill

    DOE Patents [OSTI]

    Sprouse, Kenneth M.

    2016-05-17

    A biomass torrefaction system includes a mill which receives a raw biomass feedstock and operates at temperatures above 400 F (204 C) to generate a dusty flue gas which contains a milled biomass product.

  6. EIS-0355: Notice of Intent to Prepare an Environmental Impact...

    Office of Environmental Management (EM)

    Remediation of the Moab Uranium Mill Tailings Site in Grand County, UT DOE announces its ... soils, tailings, and ground water at the Moab Uranium Mill Tailings Site (Moab Project ...

  7. EIS-0355: Amended Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    EIS-0355: Amended Record of Decision Remediation of the Moab Uranium Mill Tailings, Grand ... (residual radioactive material) at the Moab milling site and vicinity properties in Utah. ...

  8. GRAND CHALLENGE PROBLEMS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GRAND CHALLENGE PROBLEMS Time is the biggest issue. Materials typically become critical in a matter of months, but solutions take years or decades to develop and implement. Our first two grand challenges address this discrepancy. Anticipating Which Materials May Go Critical In an ideal world, users of materials would anticipate supply-chain disruptions before they occur. They would undertake activities to manage the risks of disruption, including R&D to diversify and increase supplies or to

  9. Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation...

    Office of Legacy Management (LM)

    ... If Wetland 3 develops as designed, there is a potential risk to U.S. Depamncnt of Energy ... exceed 200 pgL, followed by solar evaporative treatment at an existing on-site facility. ...

  10. Uranium Mill Tailings Remedial Action Program. Annual status report

    SciTech Connect (OSTI)

    Not Available

    1980-12-01

    The purpose, scope, history, requirements, and management organization of the UMTRA Program are summarized in the Introduction. The remainder of the report describes progress made during the past year (F 1980) and discusses future plants and activities. Early emphasis has been on the four highest-priority sites because of their proximity to population centers. These sites are: (1) Canonsburg, Pennsylvania; (2) Salt Lake City, Utah; (3) Durango, Colorado; and (4) Shiprock, New Mexico (Navajo Reservation). To date, twenty-five vicinity properties near the Canonsburg site and two such properties near the Salt Lake City site have been designated for remedial action. A research effort was undertaken at a major vicinity property, the Mountain States Supply Company in Salt Lake City, to study the effects of heating-and-ventilating-system modification on indoor radon-daughter concentrations. A cooperative agreement was executed between DOE and the Commonwealth of Pennsylvania. A similar agreement with the State of Utah is expected to be executed in early FY 1981. Further, it is expected that additional cooperative agreements will be negotiated during FY 1981 with the States of Colorado and Wyoming and the Navajo Nation. It is expected that the processing site at Canonsburg, PA (the Canonsburg Industrial Park) will be acquired during FY 1981. Draft Environmental Impact Statements for the four highest-priority sites will be completed during FY 1981.

  11. EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project

    Broader source: Energy.gov [DOE]

    This EIS assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides...

  12. Monticello Mill Tailings Site Operable Unit III Ecological Risk

    Office of Legacy Management (LM)

    ... in sodium and other trace elements (Robbins 1993). Soil ingestion rate values are rare in the literature. ... Radium-226, as an alkaline earth series radionuclide, is ...

  13. Raptor Use of the Rio Grande Gorge

    SciTech Connect (OSTI)

    Ponton, David A.

    2015-03-20

    The Rio Grande Gorge is a 115 km long river canyon located in Southern Colorado (15 km) and Northern New Mexico (100 km). The majority of the canyon is under the administration of the Bureau of Land Management {BLM), and 77 km of the canyon south of the Colorado/New Mexico border are designated Wild River under the National Wild and Scenic Rivers Act of 1968. Visits I have made to the Rio Grande Gorge over the past 15 .years disclosed some raptor utilization. As the Snake River Birds of Prey Natural Area gained publicity, its similarity to the Rio Grande Gorge became obvious, and I was intrigued by the possibility of a high raptor nesting density in the Gorge. A survey in 1979 of 20 km of the northern end of the canyon revealed a moderately high density of red-tailed hawks and prairie falcons. With the encouragement of that partial survey, and a need to assess the impact of river-running on nesting birds of prey, I made a more comprehensive survey in 1980. The results of my surveys, along with those of a 1978 helicopter survey by the BLM, are presented in this report, as well as general characterization of the area, winter use by raptors, and an assessment of factors influencing the raptor population.

  14. Mountain View Grand | Open Energy Information

    Open Energy Info (EERE)

    Mountain View Grand Jump to: navigation, search Name Mountain View Grand Facility Mountain View Grand Sector Wind energy Facility Type Small Scale Wind Facility Status In Service...

  15. Limited Groundwater Investigation of The Atlas Corporation Moab Mill, Moab, Utah

    SciTech Connect (OSTI)

    Easterly, CE

    2001-11-05

    The project described in this report was conducted by personnel from Oak Ridge National Laboratory's Grand Junction Office (ORNL/GJ). The purpose was to refine information regarding groundwater contamination emanating from the Atlas Corporation's former uranium mill in Moab, Utah.

  16. 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist Team

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Submissions | Department of Energy Grand Winner and Grand Winner Finalist Team Submissions 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist Team Submissions Read the team submissions for the Grand Winner and Grand Winner Finalist teams from the 2015 Race to Zero Student Design Competition below. Learn more about the results of the 2015 competition. Grand Winner: Opti-MN, University of Minnesota (38.54 MB) Grand Winner Finalist: Team App, Appalachian State University (4.78

  17. Rio Grande North | Open Energy Information

    Open Energy Info (EERE)

    search Name Rio Grande North Facility Rio Grande North Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx...

  18. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January ...

  19. Evaluation of End Mill Coatings

    SciTech Connect (OSTI)

    L. J. Lazarus; R. L. Hester,

    2005-08-01

    Milling tests were run on families of High Speed Steel (HSS) end mills to determine their lives while machining 304 Stainless Steel. The end mills tested were made from M7, M42 and T15-CPM High Speed Steels. The end mills were also evaluated with no coatings as well as with Titanium Nitride (TiN) and Titanium Carbo-Nitride (TiCN) coatings to determine which combination of HSS and coating provided the highest increase in end mill life while increasing the cost of the tool the least. We found end mill made from M42 gave us the largest increase in tool life with the least increase in cost. The results of this study will be used by Cutting Tool Engineering in determining which end mill descriptions will be dropped from our tool catalog.

  20. Grand Junction Office Founder Honored...

    Energy Savers [EERE]

    4 Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park Dedication and Open House The U.S. Department of Energy (DOE) Offce of Legacy Management (LM) held an ...

  1. Nuclear Proliferation and Grand Challenges

    SciTech Connect (OSTI)

    McCarthy, Kathy

    2009-01-01

    Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

  2. Nuclear Proliferation and Grand Challenges

    ScienceCinema (OSTI)

    McCarthy, Kathy

    2013-05-28

    Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

  3. 2015 Annual Site Inspection and Monitoring Report for Uranium...

    Office of Legacy Management (LM)

    Site 6.1 Compliance Summary The Grand Junction, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on December 8, 2015. A ...

  4. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah September 3, 2004 EIS-0346: Draft Environmental Impact Statement Salmon...

  5. LM News Archive | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grand Junction, Colo. - The U.S. Department of Energy announces the availability of the 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation ...

  6. DOE - Office of Legacy Management -- GJD

    Office of Legacy Management (LM)

    Key Documents Fact Sheet 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Grand Junction, Colorado, Disposal ...

  7. Independent Communication and Outreach Stakeholder Satisfaction...

    Broader source: Energy.gov (indexed) [DOE]

    ... multiple Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I sites (Grand Junction, Shiprock, Monument Valley, Mexican Hat, and Tuba City), while the Fernald and ...

  8. EIS-0355: DOE Notice of Availability of the Final Environmental...

    Office of Environmental Management (EM)

    Junction, Utah, using rail transportation, and implementation of active ground water remediation at the Moab site. Remediation of the Moab Uranium Mill Tailings, Grand and ...

  9. F:\\SHARE\\SE\\Web_Origs\\Wrk_Jan\\00-075\\U0027603.WP6

    Office of Legacy Management (LM)

    Environmental Assessment of Ground Water Compliance at the Tuba City Uranium Mill Tailings ... Document Number U0027603 DOE Grand Junction Office Page iii EA of Ground Water Compliance ...

  10. CX-008766: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Grand Junction Disposal Site is a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Cell. The United States Department of Energy (DOE) proposes to replace ...

  11. SU(6) grand unified model

    SciTech Connect (OSTI)

    Dong, J.X.

    1986-03-14

    A model of grand unified theory based on SU(6) gauge group is proposed. It can accommodate two generations of ordinary fermions with V-A weak coupling and two generations of weird fermions with V+A weak coupling. In this model, a new discrete symmetry is introduced that insures existence of fermions with lower masses when SU(6) gauge symmetry is spontaneously broken. Simple Higgs fields with appropriate vacuum expectation values are chosen, so that the masses of weird fermions are heavier than those of ordinary fermions. This model also gives the same value of Weinberg angle, sin sq of Theta/sub w/ = 3/8, as in the usual SU(5) grand unified model at the grand unified scale.

  12. Systematic evaluation of satellite remote sensing for identifying uranium mines and mills.

    SciTech Connect (OSTI)

    Blair, Dianna Sue; Stork, Christopher Lyle; Smartt, Heidi Anne; Smith, Jody Lynn

    2006-01-01

    In this report, we systematically evaluate the ability of current-generation, satellite-based spectroscopic sensors to distinguish uranium mines and mills from other mineral mining and milling operations. We perform this systematic evaluation by (1) outlining the remote, spectroscopic signal generation process, (2) documenting the capabilities of current commercial satellite systems, (3) systematically comparing the uranium mining and milling process to other mineral mining and milling operations, and (4) identifying the most promising observables associated with uranium mining and milling that can be identified using satellite remote sensing. The Ranger uranium mine and mill in Australia serves as a case study where we apply and test the techniques developed in this systematic analysis. Based on literature research of mineral mining and milling practices, we develop a decision tree which utilizes the information contained in one or more observables to determine whether uranium is possibly being mined and/or milled at a given site. Promising observables associated with uranium mining and milling at the Ranger site included in the decision tree are uranium ore, sulfur, the uranium pregnant leach liquor, ammonia, and uranyl compounds and sulfate ion disposed of in the tailings pond. Based on the size, concentration, and spectral characteristics of these promising observables, we then determine whether these observables can be identified using current commercial satellite systems, namely Hyperion, ASTER, and Quickbird. We conclude that the only promising observables at Ranger that can be uniquely identified using a current commercial satellite system (notably Hyperion) are magnesium chlorite in the open pit mine and the sulfur stockpile. Based on the identified magnesium chlorite and sulfur observables, the decision tree narrows the possible mineral candidates at Ranger to uranium, copper, zinc, manganese, vanadium, the rare earths, and phosphorus, all of which are

  13. Annual Inspection of the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    6 Annual Inspection - Grand Junction, Colorado, Office Site April 2016 Page 1 Annual Inspection of the Grand Junction, Colorado, Site 1.1 Inspection Summary The Grand Junction, ...

  14. Grand Junction, Colorado, Site Fact Sheet

    Office of Legacy Management (LM)

    D D&D Page 1 of 3 Fact Sheet Grand Junction, Colorado, Site This fact sheet provides information about the Grand Junction, Colorado, Site. This site is managed by the U.S. ...

  15. DOE Grand Junction Projects Office Edgemont LTSP

    Office of Legacy Management (LM)

    DOE Grand Junction Projects Office Edgemont LTSP June 1996 Page ii Contents Page 1.0 Introduction ......

  16. Estimated dose to man from uranium milling via the terrestrial food-chain pathway

    SciTech Connect (OSTI)

    Rayno, D.R.

    1982-01-01

    One of the major pathways of radiological exposure to man from uranium milling operations is through the terrestrial food chain. Studies by various investigators have shown the extent of uptake and distribution of U-238, U-234, Th-230, Ra-226, Pb-210, and Po-210 in plants and animals. These long-lived natural radioisotopes, all nuclides of the uranium decay series, are found in concentrated amounts in uranium mill tailings. Data from these investigations are used to estimate the dose to man from consumption of beef and milk contaminated by the tailings. This dose estimate from this technologically enhanced source is compared with that from average normal dietary intake of these radionuclides from natural sources.

  17. Moab Marks 6-Million-Ton Cleanup Milestone | Department of Energy

    Office of Environmental Management (EM)

    Grand County Council Chair Gene Ciarus is on the left and Grand County Council Vice Chair ... uranium mill tailings from the site to an engineered disposal cell near Crescent Junction. ...

  18. Gas fluidized-bed stirred media mill

    DOE Patents [OSTI]

    Sadler, III, Leon Y.

    1997-01-01

    A gas fluidized-bed stirred media mill is provided for comminuting solid ticles. The mill includes a housing enclosing a porous fluidizing gas diffuser plate, a baffled rotor and stator, a hollow drive shaft with lateral vents, and baffled gas exhaust exit ports. In operation, fluidizing gas is forced through the mill, fluidizing the raw material and milling media. The rotating rotor, stator and milling media comminute the raw material to be ground. Small entrained particles may be carried from the mill by the gas through the exit ports when the particles reach a very fine size.

  19. Mississippi Nuclear Profile - Grand Gulf

    U.S. Energy Information Administration (EIA) Indexed Site

    Grand Gulf" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,"1,251","9,643",88.0,"BWR","application/vnd.ms-excel","application/vnd.ms-excel" ,"1,251","9,643",88.0 "Data for 2010" "BWR = Boiling Water Reactor."

  20. EV Everywhere Grand Challenge Blueprint

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to enable plug-in electric vehicles (PEVs) that are as affordable and convenient for the American family as gasoline-powered vehicles by 2022. I am more convinced now than ever that we can capture this opportunity, and I am committed to making the strategic investments necessary to get there. These investments will: 1) improve the competitive position of U.S.

  1. Radium-226 in vegetation and substrates at inactive uranium mill sites

    SciTech Connect (OSTI)

    Marple, M.L.

    1980-01-01

    Results of a study of the content of radium-226 in plants growing on inactive uranium mill tailings sites in the Four Corners Region of the southwestern United States and in plants grown under greenhouse conditions with minimal surficial contamination are reported. Field plant samples and associated substrates were analyzed from two carbonate tailings sites in the Grants Mineral Belt of New Mexico. Radium activities in air-cleaned samples ranged from 5 to 368 pCi/g (dry weight) depending on species and location: activities in plants growing on local soils averaged 1.0 pCi/g. The talings and local soils contain 140 to 1400 pCi/g and 2.1 pCi/g, respectively. An evaluation of cleaning methods on selected samples showed that from 17 to 79% of the radium activity measured in air-cleaned samples was due to surficial contamination, which varied with species and location. A survey of 18 inactive uranium mill sites in the Four Corners Region was performed. Radium activity in plant tissues from nine species ranged from 2 to 210 pCi/g on bare tailings and from 0.3 to 30 pCi/g on covered tailings The radium content in most of the soil overburdens on the covered tailings piles was 10 to 17 pCi/g. An experiment was performed to measure radium-226 uptake by two species grown on tailings covered with a shallow (5 cm) soil layer. A grass, Sporobolus airoides (alkali sacaton) and a shrub, Atriplex canescens (four-wing saltbush), were studied. The tailings were a mixture of sands and slimes from a carbonate pile. The tailings treatments were plants grown in a soil cover over tailings; the controls were plants grown only in soil. Three soil types, dune sand, clay loam, and loam, were used. The radium activity of the plant tissue from the tailings treatment compared to that of the appropriate control was 1 to 19 times greater for the grass and 4 to 27 times greater for the shrub.

  2. Langdon II - Otter Tail Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Otter Tail Wind Farm Jump to: navigation, search Name Langdon II - Otter Tail Wind Farm Facility Langdon II - Otter Tail Sector Wind energy Facility Type Commercial Scale Wind...

  3. Destilaria Rio Grande | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name: Destilaria Rio Grande Place: Fronteira, Minas Gerais, Brazil Zip: 38230-000 Product: Brazil based ethanol producer. References: Destilaria Rio...

  4. Usina Serra Grande | Open Energy Information

    Open Energy Info (EERE)

    navigation, search Name: Usina Serra Grande Place: Maceio, Alagoas, Brazil Product: Ethanol producer Coordinates: -9.666479, -35.734954 Show Map Loading map......

  5. EV Everywhere Grand Challenge - Charging Infrastructure Enabling...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Framing Workshop Report Out & Lessons Learned EV Everywhere Grand ...

  6. Hydrogen Storage Grand Challenge Individual Projects

    Broader source: Energy.gov [DOE]

    Hydrogen Storage Grand Challenge individual projects funded for three Centers of Excellence, led by the National Renewable Energy Laboratory, Sandia National Laboratories, and Los Alamos National Laboratory

  7. EV Everywhere Grand Challenge - Battery Workshop Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...2012 EV Everywhere Grand Challenge -- Battery Workshop Thursday, July 26, 2012 - ... Technologies Program 9:25-9:50 AM EV BATTERY TECHNOLOGY-CURRENT STATUS & COST ...

  8. PP-33 Rio Grande Electric Cooperative Inc

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing Grande Electric Cooperative Inc to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border.

  9. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 9 PDF icon grandchallengesportfoliopg9.pdf More Documents & Publications ...

  10. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 8 PDF icon grandchallengesportfoliopg8.pdf More Documents & Publications ...

  11. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 6 PDF icon grandchallengesportfoliopg6.pdf More Documents & Publications ...

  12. EV Everywhere Grand Challenge Overview Presentation

    Broader source: Energy.gov [DOE]

    Presentation by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI

  13. Grand River Dam Authority | Open Energy Information

    Open Energy Info (EERE)

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  14. 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist...

    Broader source: Energy.gov (indexed) [DOE]

    Learn more about the results of the 2015 competition. PDF icon Grand Winner: Opti-MN, University of Minnesota PDF icon Grand Winner Finalist: Team App, Appalachian State University ...

  15. Milling of key slots on long shafts

    SciTech Connect (OSTI)

    Agadzhanyan, R.A.; Bogdanenko, Yu.G.

    1987-03-01

    The authors look for and test methods and tool materials for milling key slots into rod pump shafts made of steel-03KH14N7V and K Monel alloy which not only increase the precision of the milling process but also extend the life of the milling tool. Their test parameters include various methods for introduction of the cutting fluid into the milling process, the effect of carbonitridation of the tool material, and the productivity of the machine itself.

  16. City of Grand Marais, Minnesota (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Grand Marais Place: Minnesota Phone Number: (218) 387-3030 or (218)387-1848 Website: www.ci.grand-marais.mn.usinde Facebook: https:www.facebook.comGrandMaraisMN Outage Hotline:...

  17. 2014 Race to Zero Student Design Competition: Grand Winner Teams...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams, from the U.S. Department of ...

  18. EA-33 Rio Grande Electric | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-33 Rio Grande Electric Order authorizing Rio Grande Electric to export electric energy to Mexico PDF icon EA-33 Rio Grande Electric More Documents & Publications EA-33-A and ...

  19. EV Everywhere Grand Challenge Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2_danielson_caci.pdf (299.97 KB) More Documents & Publications EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV Everywhere Grand Challenge Overview EV Everywhere Battery Workshop: Setting the Stage for the EV Everywhere Grand Challenge

  20. Defining the Mechanisms of Friction: A Grand Challenge in Interfacial...

    Office of Scientific and Technical Information (OSTI)

    Defining the Mechanisms of Friction: A Grand Challenge in Interfacial Mechanics. Citation Details In-Document Search Title: Defining the Mechanisms of Friction: A Grand Challenge...

  1. Winning the Future: Grand Ronde Solar Projects Reduce Pollution...

    Energy Savers [EERE]

    Grand Ronde Solar Projects Reduce Pollution, Cut Costs Winning the Future: Grand Ronde Solar Projects ... to develop renewable energy projects and implement energy efficiency measures. ...

  2. Preservationists Tour Historic Log Cabin at the Grand Junction...

    Office of Environmental Management (EM)

    Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office April 19, 2016 - ...

  3. Grand Junction Office Founder Honored at the Philip C. Leahy...

    Office of Environmental Management (EM)

    Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park Dedication and Open House Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park ...

  4. Students from Grand Junction High School Triumph in Colorado...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Junction High School Triumph in Colorado Science Bowl For more information contact: e:mail: Public Affairs Golden, Colo., Feb. 12, 2000 - Students from Grand Junction High ...

  5. EV Everywhere EV Everywhere Grand Challenge - Electric Drive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop Agenda EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power ...

  6. Rio Grande Rift Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Region Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al., 2010) Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) Magnetotellurics At...

  7. East Grand St Bridge Snowmelt Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Jump to: navigation, search Name East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Facility East...

  8. Agropecuaria e Industrial Serra Grande | Open Energy Information

    Open Energy Info (EERE)

    e Industrial Serra Grande Jump to: navigation, search Name: Agropecuaria e Industrial Serra Grande Place: So Raimundo das Mangabeiras, Maranhao, Brazil Product: Privately owned...

  9. Online SAG Mill Pluse Measurement and Optimization

    SciTech Connect (OSTI)

    Raj Rajamani; Jose Delgadillo; Vishal Duriseti

    2007-06-30

    The grinding efficiency of semi autogenous milling or ball milling depends on the tumbling motion of the total charge within the mill. Utilization of this tumbling motion for efficient breakage of particles depends on the conditions inside the mill. However, any kind of monitoring device to measure the conditions inside the mill shell during operation is virtually impossible due to the severe environment presented by the tumbling charge. An instrumented grinding ball, which is capable of surviving a few hours and transmitting the impacts it experiences, is proposed here. The spectrum of impacts collected over 100 revolutions of the mills presents the signature of the grinding environment inside mill. This signature could be effectively used to optimize the milling performance by investigating this signature's relation to mill product size, mill throughput, make-up ball size, mill speed, liner profile and ball addition rates. At the same time, it can also be used to design balls and liner systems that can survive longer in the mill. The technological advances made in electronics and communication makes this leap in instrumentation certainly viable. Hence, the instrumented grinding ball offers the ability to qualitatively observe and optimize the milling environment. An instrumented load cell package that can measure the force of impacts inside the grinding chamber of a mill is developed here. The signal from the instrumented load cell package is interpreted in terms of a histogram termed as an impact spectrum which is a plot of the number of impacts at a specific energy level against the energy. It reflects on the average force regime of the mill. The instrumented load cell package was calibrated against the ultra fast load cell which has been unanimously accepted as a standard to measure single breakage events. The load cell package was successfully used to produce impact spectra in an 8.5 inch lab scale mill. The mill speed and the ball size were varied to study

  10. Wintertime meteorology of the Grand Canyon region

    SciTech Connect (OSTI)

    Whiteman, C.D.

    1992-09-01

    The Grand Canyon region of the American Southwest is an interesting region meteorologically, but because of its isolated location, the lack of major population centers in the region, and the high cost of meteorological field experiments, it has historically received little observational attention. In recent years, however, attention has been directed to episodes of visibility degradation in many of the US National parks, and two recent field studies focused on this visibility problem have greatly increased the meteorological data available for the Grand Canyon region. The most recent and comprehensive of these studies is the Navajo Generating Station Winter Visibility Study of 1989--90. This study investigated the sources of visibility degradation in Grand Canyon National Park and the meteorological mechanisms leading to low visibility episodes. In this paper we present analyses of this rich data set to gain a better understanding of the key wintertime meteorological features of the Grand Canyon region.

  11. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gates Replacement This project is part of the Third Powerplant overhaul at Grand Coulee Dam. The full overhaul effort involves a mechanical overhaul of units G19 - G24. The...

  12. CMI Grand Challenge Problems | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CMI Grand Challenge Problems Time is the biggest issue. Materials typically become critical in a matter of months, but solutions take years or decades to develop and implement. Our first two grand challenges address this discrepancy. Anticipating Which Materials May Go Critical In an ideal world, users of materials would anticipate supply-chain disruptions before they occur. They would undertake activities to manage the risks of disruption, including R&D to diversify and increase supplies or

  13. Design, Performance, and Sustainability of Engineered Covers for Uranium Mill Tailings

    Broader source: Energy.gov [DOE]

    Proceedings of the Workshop on Long-Term Performance Monitoring of Metals and Radionuclides in the Subsurface: Strategies, Tools, and Case Studies. U.S. Geological Survey.April 21 and 22, 2004,...

  14. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect (OSTI)

    Not Available

    1985-12-01

    FY 1985 project accomplishments include: completed 90% of the processing site remedial actions at Canonsburg, Pennsylvania, and initiated remedial actions at Salt Lake City, Utah, and Shiprock, New Mexico; awarded remedial action contracts on 329 vicinity properties at seven designated locations and completed survey and inclusion activities on a total of 1620 vicinity properties; published the Environmental Assessment (EA) for Lakeview, Oregon, issued the draft and prepared the final Environmental Impact Statement (EIS) for Durango, Colorado; completed the Remedial Action Plan (RAP) for Lakeview, Oregon, and prepared the draft RAP for Durango, Colorado; executed cooperative agreements with Idaho, New Mexico, and the Navajo Nation/Hopi Tribe; executed a Memorandum of Understanding with the Nuclear Regulatory Commission; and developed proposed UMTRA Project design review criteria between DOE and the NRC.

  15. Remedial action plan for stabilization of the inactive uranium mill tailings site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1986-02-01

    This Remedial Action Plan (RAP) has been developed to serve a two-fold purpose. It presents the series of activities which are proposed by the U.S. Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Monument Valley, Arizona It also serves to document the concurrence of both the Navajo Nation and the U.S. Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  16. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 2

    SciTech Connect (OSTI)

    1993-12-31

    This report contains environmental monitoring information for the following UMTRA sites for the 1992 Calendar Year: Lakeview, OR; Lowman, ID; Mexican Hat, UT; Monument Valley, AZ; Rifle, CO; Riverton, WY; Shiprock, NM; Spook, WY; Tuba City, AZ. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  17. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Rifle, Colorado

    SciTech Connect (OSTI)

    1995-05-01

    The ground water project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. This report is a site specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. Currently, no one is using the ground water and therefore, no one is at risk. However, the land will probably be developed in the future and so the possibility of people using the ground water does exist. This report examines the future possibility of health hazards resulting from the ingestion of contaminated drinking water, skin contact, fish ingestion, or contact with surface waters and sediments.

  18. Mille Lacs Energy Cooperative | Open Energy Information

    Open Energy Info (EERE)

    Cooperative Place: Minnesota Phone Number: 1-800-450-2191 Website: www.mlecmn.net Facebook: https:www.facebook.compagesMille-Lacs-Energy-Cooperative299198793447582 Outage...

  19. Kumar, Jitendra; Hoffman, Forrest; Hargrove, William; Mills,...

    Office of Scientific and Technical Information (OSTI)

    based Sampling Network Design for the State of Alaska Kumar, Jitendra; Hoffman, Forrest; Hargrove, William; Mills, Richard 54 Environmental Sciences Ecoregions; Representativeness;...

  20. Colony Mills Limited | Open Energy Information

    Open Energy Info (EERE)

    Place: Lahore, Pakistan Sector: Solar Product: Yarn manufacturer, plans to set up solar thermal plant. References: Colony Mills Limited1 This article is a stub. You can help...

  1. Progress Toward Remediation of Uranium Tailings in Mailuu-Suu, Kyrgyzstan

    SciTech Connect (OSTI)

    Buckley, P B; Ranville, J; Honeyman, B D; Smith, D K; Rosenberg, N; Knapp, R B

    2003-07-09

    The town of Mailuu-Suu in Kyrgyzstan inherited 23 distinct tailings deposits from Soviet-Era uranium mining operations. Mailuu-Suu is located in the narrow landslide-prone valley of the Mailuu-Suu River about 25 km from the Uzbekistan border. Large-scale release of the radioactive tailings, as a result of landslides, could lead to irreversible contamination of the river and downstream areas. The Mailuu-Suu River is a tributary to the Syr-Darya River, the Fergana valley's main source of irrigation water. The Fergana Valley is a key agricultural region and major population center that spans Kyrgyzstan, Tajikistan, and Uzbekistan. The trans-boundary nature of the Mailuu-Suu tailings issue presents an opportunity for collaboration among these Central Asian states. A cooperative approach to addressing environmental issues such as Mailuu-Suu may contribute to the region's stability by facilitating peaceful associations. Experience from remediation of sites in the US under the Uranium Mill Tailings Remediation Action Project (UMTRA) will be useful in progressing toward remediation at Mailuu-Suu.

  2. Finding of No Significant Impact, proposed remediation of the Maybell Uranium Mill Processing Site, Maybell, Colorado

    SciTech Connect (OSTI)

    Not Available

    1995-12-31

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0347) on the proposed surface remediation of the Maybell uranium mill processing site in Moffat County, Colorado. The mill site contains radioactively contaminated materials from processing uranium ore that would be stabilized in place at the existing tailings pile location. Based on the analysis in the EA, DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, Public Law 91-190 (42 U.S.C. {section}4321 et seq.), as amended. Therefore, preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  3. EV Everywhere Grand Challenge - Battery Workshop Agenda | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Agenda EV Everywhere Grand Challenge - Battery Workshop Agenda Agenda for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL. agenda_b.pdf (196.97 KB) More Documents & Publications EV Everywhere Grand Challenge - Charge to the Breakout Groups EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV Everywhere Grand Challenge Kick-Off

  4. EV Everywhere Grand Challenge - Battery Workshop attendees list |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy attendees list EV Everywhere Grand Challenge - Battery Workshop attendees list Attendance list for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree OHare, Chicago, IL. companies_in_attendance_b.pdf (149.45 KB) More Documents & Publications EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge Overview EV Everywhere Grand Challenge Introduction for

  5. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    SciTech Connect (OSTI)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  6. Comet tail formation: Giotto observations

    SciTech Connect (OSTI)

    Wilken, B.; Jockers, K.; Johnstone, A.; Coates, A.; Heath, J.; Formisano, V.; Amata, E.; Winningham, J.D.; Thomsen, M.; Bryant, D.A.

    1986-01-01

    The process of mass loading of the solar wind by cometary ions, which forms comet tails, has been observed throughout the coma of comet Halley. Three distinct regimes were found where the nature of the energy and momentum coupling between solar wind and cometary ions is different. Outside the bow shock, where there is little angular scattering of the freshly ionized particles, the coupling is described by the simple pickup trajectory and the energy is controlled by the angle between the flow and the magnetic field. Just inside the bow shock, there is considerable scattering accompanied by another acceleration process which raises some particle energies well above the straightforward pickup value. Finally, closer to the nucleus, the amount of scattering decreases and the coupling is once more controlled by the magnetic field direction. 4 refs., 3 figs.

  7. Uranium mill ore dust characterization

    SciTech Connect (OSTI)

    Knuth, R.H.; George, A.C.

    1980-11-01

    Cascade impactor and general air ore dust measurements were taken in a uranium processing mill in order to characterize the airborne activity, the degree of equilibrium, the particle size distribution and the respirable fraction for the /sup 238/U chain nuclides. The sampling locations were selected to limit the possibility of cross contamination by airborne dusts originating in different process areas of the mill. The reliability of the modified impactor and measurement techniques was ascertained by duplicate sampling. The results reveal no significant deviation from secular equilibrium in both airborne and bulk ore samples for the /sup 234/U and /sup 230/Th nuclides. In total airborne dust measurements, the /sup 226/Ra and /sup 210/Pb nuclides were found to be depleted by 20 and 25%, respectively. Bulk ore samples showed depletions of 10% for the /sup 226/Ra and /sup 210/Pb nuclides. Impactor samples show disequilibrium of /sup 226/Ra as high as +-50% for different size fractions. In these samples the /sup 226/Ra ratio was generally found to increase as particle size decreased. Activity median aerodynamic diameters of the airborne dusts ranged from 5 to 30 ..mu..m with a median diameter of 11 ..mu..m. The maximum respirable fraction for the ore dusts, based on the proposed International Commission on Radiological Protection's (ICRP) definition of pulmonary deposition, was < 15% of the total airborne concentration. Ore dust parameters calculated for impactor duplicate samples were found to be in excellent agreement.

  8. Deconfinement in Yang-Mills Theory through Toroidal Compactification...

    Office of Scientific and Technical Information (OSTI)

    Deconfinement in Yang-Mills Theory through Toroidal Compactification Citation Details In-Document Search Title: Deconfinement in Yang-Mills Theory through Toroidal Compactification ...

  9. Mill Run Wind Power Project | Open Energy Information

    Open Energy Info (EERE)

    Run Wind Power Project Jump to: navigation, search Name Mill Run Wind Power Project Facility Mill Run Wind Power Project Sector Wind energy Facility Type Commercial Scale Wind...

  10. Beijing Jingye Bearing Manufacture for Rolling Mills Co Ltd ...

    Open Energy Info (EERE)

    Beijing Jingye Bearing Manufacture for Rolling Mills Co Ltd Jump to: navigation, search Name: Beijing Jingye Bearing Manufacture for Rolling Mills Co Ltd Place: Beijing...

  11. West Coast Paper Mills Ltd WCPML | Open Energy Information

    Open Energy Info (EERE)

    Paper Mills Ltd WCPML Jump to: navigation, search Name: West Coast Paper Mills Ltd. (WCPML) Place: Dandeli, Karnataka, India Zip: 581 325 Sector: Biomass Product: Dandeli based...

  12. SURVEY OF ROLLING MILL USED BY BETHLEHEM STEEL CORPORATION LACKAWANNA...

    Office of Legacy Management (LM)

    SURVEY OF ROLLING MILL USED BY BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK Work ... SURVEY OF ROLLING MILL USED BY BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK A ...

  13. Tamil Nadu Spinning Mills Association TASMA | Open Energy Information

    Open Energy Info (EERE)

    Tamil Nadu, India Zip: 624003 Sector: Wind energy Product: Association of spinning mill owners; promoting wind power projects. References: Tamil Nadu Spinning Mills...

  14. Boise Inc. St. Helens Paper Mill Achieves Significant Fuel Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Boise Inc. St. Helens Paper Mill Achieves Significant Fuel Savings Boise Inc. St. Helens Paper Mill Achieves Significant Fuel Savings This case study describes how the Boise Inc. ...

  15. Middle Rio Grande Cooperative Water Model

    Energy Science and Technology Software Center (OSTI)

    2005-11-01

    This is computer simulation model built in a commercial modeling product Called Studio Expert, developed by Powersim, Inc. The simulation model is built in a system dynamics environment, allowing the simulation of the interaction among multiple systems that are all changing over time. The model focuses on hydrology, ecology, demography, and economy of the Middle Rio Grande, with Water as the unifying feature.

  16. Energy Secretary Steven Chu to Attend Grand Opening of Recovery...

    Energy Savers [EERE]

    to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant ...

  17. DOE/EIS-0485 Final Environmental Impact Statement Grande Prairie...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grande Prairie Wind has applied to Western to interconnect the proposed Project to Western's 345-kilovolt (kV) Fort Thompson to Grand Island transmission line at a new switchyard. ...

  18. GreenHunter Biodiesel Refinery Grand Opening | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening June 2, 2008 - 12:51pm Addthis Remarks as Prepared for (Acting) Deputy Secretary Kupfer ...

  19. SunShot Grand Challenge Summit Breakout Sessions Announced

    Broader source: Energy.gov [DOE]

    The 2014 SunShot Grand Challenge Summit is only six weeks away! SunShot is excited to announce our thought-provoking lineup of Grand Challenge Breakout Sessions.

  20. City of Grand Haven, Michigan (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Grand Haven Place: Michigan Phone Number: (616) 846-6250 Website: www.ghblp.org Twitter: @ghblp Facebook: https:www.facebook.comGrandHavenBLP Outage Hotline: (616) 842-2241...

  1. Rio Grande LNG LLC- Dkt. No. 15-190-LNG

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Fossil Energy gives notice of receipt of an Application filed December 23, 2015, by Rio Grande LNG, LLC (Rio Grande), seeking a long-term multi-contract authorization to export...

  2. Grand Challenges | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Science Highlights News & Events Publications History Grand Challenges BES Reports Document Archives Contests Contact BES Home History Grand Challenges Print Text Size: A A A FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored

  3. Grand Challenges | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Grand Challenges BES Reports Science Highlights News & Events Publications History Contact BES Home Research Grand Challenges Print Text Size: A A A FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored workshops that began in 2001.

  4. PP-53 Rio Grande Electric Cooperative, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Rio Grande Electric Cooperative, Inc. PP-53 Rio Grande Electric Cooperative, Inc. Presidential Permit authorizing Rio Grande Electric Cooperative, Inc.to construct, operate, and maintain electric transmission facilities at the U.S. - Mexico Border. PP-53 Rio Grande Electric Cooperative, Inc. (1.09 MB) More Documents & Publications PP-55 Roseau Electric Cooperative, Inc. PP-42 Roseau Electric Cooperative, Inc. PP-67 North Central Electric Cooperative, Inc.

  5. EV Everywhere Grand Challenge - Charge to the Breakout Groups | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Charge to the Breakout Groups EV Everywhere Grand Challenge - Charge to the Breakout Groups Presentation given at the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree OHare, Chicago, IL. 7_howell_b.pdf (796.65 KB) More Documents & Publications EV Everywhere - Charge to Breakout Sessions EV Everywhere Grand Challenge - Battery Workshop Agenda EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric

  6. 2014 Race to Zero Student Design Competition: Grand Winner Teams |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams, from the U.S. Department of Energy. rtz_grand_winner_team_rosters.pdf (59.94 KB) More Documents & Publications 2014 Race to Zero Student Design Competition: Montage Builders Team Submission 2014 Race to Zero Student Design Competition: Montage Builders Profile 2014 Race to Zero Student Design Competition: Auburn

  7. Hydrogen Storage Grand Challenge Centers of Excellence | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Centers of Excellence Hydrogen Storage Grand Challenge Centers of Excellence DOE's Hydrogen Storage Grand Challenge Centers of Excellence and partners, led by NREL, SNL, and LANL grand_challenge_centers.pdf (62.21 KB) More Documents & Publications Hydrogen Storage Grand Challenge Individual Projects Final Solar and Wind H2 Report EPAct 812.doc Microsoft Word - H2 National Release 2.doc

  8. The Bowersock Mills and Power Company 1874

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Incremental Hydroelectric Energy The Bowersock Mills and Power Co., Lawrence, KS ... It comes from putting in better turbines in existing dams, it comes from run-of-the-river ...

  9. Lake Mills Light & Water | Open Energy Information

    Open Energy Info (EERE)

    Light & Water Jump to: navigation, search Name: Lake Mills Light & Water Place: Wisconsin Phone Number: (920) 648-4026 Website: www.lakemillslw.com Outage Hotline: (920) 648-4026...

  10. Gary Mills | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mills Curriculum Vitae Faculty & Scientists SREL Home Gary Mills Savannah River Ecology Laboratory P O Drawer E, Aiken, SC 29802 (803) 725-5368 office (803) 725-3309 fax gmills(at)srel.uga.edu My research interest is in the biogeochemistry of aquatic ecosystems and my projects have included studies on stream, wetland, and estuarine systems as well as geothermal hot springs. My current research is focused on techniques for determining the bioavailable fraction of dissolved metals in wetland

  11. EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado.

  12. SunShot Grand Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Grand Challenge SunShot Grand Challenge Addthis SunShot Grand Challenge 1 of 28 SunShot Grand Challenge Participants gather for the plenary session at the SunShot Grand Challenge Summit and Technology Forum in Denver, Colorado. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:10 Arun Majumdar, Founding Director, ARPA-E 2 of 28 Arun Majumdar, Founding Director, ARPA-E Arun Majumdar, Founding Director, ARPA-E gives the welcoming remarks. (Photo by DENNIS SCHROEDER / NREL) Date

  13. Upper Rio Grande Simulation Model (URGSIM)

    Energy Science and Technology Software Center (OSTI)

    2010-08-05

    URGSIM estimates the location of surface water and groundwater resources in the upper Rio Grande Basin between the Colorado-New Mexico state line, and Caballo Reservoir from 1975 - 2045. It is a mass balance hydrology model of the Upper Rio Grande surface water, groundwater, and water demand systems which runs at a monthly timestep from 1975-1999 in calibration mode, 2000 – 2004 in validation mode, and 2005 – 2045 in scenario analysis mode.

  14. Rio Grande pipeline introduces LPG to Mexico

    SciTech Connect (OSTI)

    1997-06-01

    Rio Grande Pipeline, a joint venture between Mid-America Pipeline Co., Amoco Pipeline Co. and Navajo Pipeline Co., has broken new ground in the energy industry as the first LPG pipeline to cross the US-Mexico border. Plans for the project were announced in November 1995 and first deliveries started three months ago on March 21, 1997. The 8-inch, 265-mile pipeline originates near Odessa, TX, where it receives an 85-15 propane-butane mix via a connection to Mid-America Pipeline. From Odessa, product moves west through the Texas desert and crosses the Rio Grande River about 15 miles south of El Paso near Clint, TX and extends 20 miles into Mexico. Capacity of the line is 24,000 bpd and it has been averaging about 22,000 bpd since line-fill. All in all, it sounded like a reasonably feasible, routine project. But perceptions can be deceiving, or at least misleading. In other words, the project can be summarized as follows: one river, two cultures and a world of difference. The official border crossing for pipeline construction took place on Dec. 2, 1996, with a directional drill under the Rio Grande River, but in actuality, the joint venture partners were continually bridging differences in language, laws, customs and norms with Pemex and contracted workers from Mexico.

  15. Moab Project Logs 2 Million Work Hours Without Lost-Time Injury...

    Office of Environmental Management (EM)

    Empty containers on haul trucks are loaded with mill tailings. GRAND JUNCTION, Colo. - The number 1,584 may not mean much to most people, but for the workers on EM's Moab Uranium ...

  16. msgbk-2

    Office of Legacy Management (LM)

    May 1999 United States Department of Energy Grand Junction Office On September 29, 1998, a Record of Decision for an Interim Remedial Action for the Monticello Mill Tailings Site, ...

  17. Hallam Nuclear Power Facility, NE

    Broader source: Energy.gov (indexed) [DOE]

    25. Baker and Williams Warehouses, NY 1993 2008 26. Falls City, TX 1994 2009 27. Grand Junction Mill Tailings Site, CO 1994 2009 28. Monument Valley, AZ 1994 2010 29. Salton Sea ...

  18. Small Site Closures

    Office of Environmental Management (EM)

    ... Center, OR 1993 Baker and Williams Warehouses, NY 1993 Falls City, TX 1994 Grand Junction Mill Tailings Site, CO 1994 Monument Valley, AZ 1994 Salton Sea Test Base, CA 1994 ...

  19. DOE Moab Site Cost-Effectively Eliminates 200 Million Gallons of Contaminated Ground Water

    Broader source: Energy.gov [DOE]

    Grand Junction, CO ― The Department of Energy (DOE) announced today that it has extracted 200 million gallons of contaminated ground water from the Moab site in Utah as part of the Moab Uranium Mill Tailings Remedial Action Project.

  20. Notice of Intent to Prepare an Environmental Impact Statement...

    Office of Environmental Management (EM)

    ... by the U.S. Atomic Energy Commission, a statutory ... either historic off-site usage of the mill tailings for ... locations: Grand County Library, 25 South 100 East, Moab, ...

  1. PartialDeletion for web.cdr

    Office of Legacy Management (LM)

    States Department of Energy Grand Junction Office F A C T S H E E T Partial Deletion of Monticello Mill Tailings Site From the National Priorities List July 2003 The U.S. ...

  2. O:\\GRAPHICS\\FACTSH~1\\MONTICEL\\millsite_restoration_web.pmd

    Office of Legacy Management (LM)

    July 2001 United States Department of Energy Grand Junction Office The U.S. Department of Energy transferred a former uranium mill tailings site and adjacent government-owned ...

  3. Microsoft PowerPoint - News Flash_FINAL_073009_vvb

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 30, 2009 Moab Steps Up the Pace of Mill Tailings Shipments U.S. Department of Energy For more information on EM Recovery Act, visit: www.em.doe.gov/emrecovery Recovery Act funds ($108 million) are being used to accelerate the frequency of uranium mill tailings shipments from the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project site to a disposal site near Crescent Junction, Utah. Mill tailings are a byproduct of uranium mining and processing. Located northwest of Moab in Grand

  4. EIS-0355: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's

  5. Validation of the Hot Strip Mill Model

    SciTech Connect (OSTI)

    Richard Shulkosky; David Rosberg; Jerrud Chapman

    2005-03-30

    The Hot Strip Mill Model (HSMM) is an off-line, PC based software originally developed by the University of British Columbia (UBC) and the National Institute of Standards and Technology (NIST) under the AISI/DOE Advanced Process Control Program. The HSMM was developed to predict the temperatures, deformations, microstructure evolution and mechanical properties of steel strip or plate rolled in a hot mill. INTEG process group inc. undertook the current task of enhancing and validating the technology. With the support of 5 North American steel producers, INTEG process group tested and validated the model using actual operating data from the steel plants and enhanced the model to improve prediction results.

  6. Owings Mills, Maryland: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    You can help OpenEI by expanding it. Owings Mills is a census-designated place in Baltimore County, Maryland.1 Registered Energy Companies in Owings Mills, Maryland...

  7. Grand Traverse Band of Ottawa and Chippewa Indians - Renewable...

    Broader source: Energy.gov (indexed) [DOE]

    ... Supply Options (Sustainable) * Wood lot improvement whole tree chips * Straw * Pellets * Farm Wood Mill Waste * Other (clean waste, cherry pits, corn..) Larger Scale ...

  8. Mill Designed Bio bleaching Technologies

    SciTech Connect (OSTI)

    Institute of Paper Science Technology

    2004-01-30

    generation of laccase has a broad spectrum of operating parameters. Nonetheless, the development of future genetically engineered laccases with enhanced temperature, pH and redox potentials will dramatically improve the overall process. A second challenge for LMS bleaching technologies is the need to develop effective, catalytic mediators. From the literature we already know this is feasible since ABTS and some inorganic mediators are catalytic. Unfortunately, the mediators that exhibit catalytic properties do not exhibit significant delignification properties and this is a challenge for future research studies. Potential short-term mill application of laccase has been recently reported by Felby132 and Chandra133 as they have demonstrated that the physical properties of linerboard can be improved when exposed to laccase without a chemical mediator. In addition, xxx has shown that the addition of laccase to the whitewater of the paper machine has several benefits for the removal of colloidal materials. Finally, this research program has presented important features on the delignification chemistry of LMS{sub NHA} and LMS{sub VA} that, in the opinion of the author, are momentous contributions to the overall LMS chemistry/biochemistry knowledge base which will continue to have future benefits.

  9. Comments of Mille Lacs Energy Cooperative | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mille Lacs Energy Cooperative Comments of Mille Lacs Energy Cooperative Comments of Mille Lacs Energy Cooperative on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Comments of Mille Lacs Energy Cooperative (77.68 KB) More Documents & Publications Comments of Utilities Telecom Council Communications Requirements of Smart Grid Technologies NBP RFI: Communications Requirements - Reply Comments of

  10. Uranium Mining and Milling near Rifle, Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Uranium Mining and Milling near Rifle, Colorado Uranium Mining and Milling near Rifle, Colorado April 19, 2016 - 4:42pm Addthis What does this project do? Goal 1. Protect Human Health and the Environment The small town of Rifle, Colorado, has an interesting history related to uranium and vanadium production. A mineral found near Rifle, called roscolite, contains both vanadium and uranium but was originally mined and milled for its vanadium content. Union Carbide Corporation began milling the ore

  11. 2012 Annual Inspection Report for the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    Annual Inspection - Grand Junction, Colorado, Site March 2012 Page 1 2012 Annual Inspection Report for the Grand Junction, Colorado, Site Summary The Grand Junction, Colorado, Site was inspected on February 23, 2012, and was in excellent condition. Physical and institutional controls enacted at the site continue to be effective in preventing exposure to contamination remaining on the property. A 5-year deficiency-based inspection of all real property assets in compliance with DOE Order 430.1B

  12. 2013 Annual Inspection Report for the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    Annual Inspection - Grand Junction, Colorado, Site April 2013 Page 1 2013 Annual Inspection Report for the Grand Junction, Colorado, Site Summary The Grand Junction, Colorado, Site was inspected on March 4, 2013, and was in excellent condition. Physical and institutional controls enacted at the site continue to be effective in preventing exposure to contamination remaining on the property. No cause for a follow-up inspection was identified. 1.0 Introduction This report presents the results of

  13. Annual Inspection of the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    Grand Junction, Colorado, Office Site March 2014 Page 1 Annual Inspection of the Grand Junction, Colorado, Site 1.1 Inspection Summary The Grand Junction, Colorado, Site was inspected on February 19, 2014, and was in excellent condition. Physical and institutional controls enacted at the site continue to be effective in preventing exposure to contamination remaining on the property. No maintenance needs were identified and no cause for a follow-up inspection was identified. The site was

  14. Annual Inspection of the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    Grand Junction, Colorado, Office Site March 2015 Page 1 Annual Inspection of the Grand Junction, Colorado, Site 1.1 Inspection Summary The Grand Junction, Colorado, Site was inspected on February 18, 2015, and was in good condition. Physical and institutional controls enacted at the site continue to be effective in preventing exposure to contamination remaining on the property. Two minor maintenance needs were identified; however, no cause for a follow-up inspection was identified. The site was

  15. Saft America Advanced Batteries Plant Celebrates Grand Opening in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jacksonville | Department of Energy Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville September 16, 2011 - 12:30pm Addthis Department of Energy Investment Helps Support Job Creation, U.S. Economic Competitiveness and Advanced Vehicle Industry WASHINGTON, D.C. - Today, Secretary Steven Chu joined with Saft America to announce the grand opening of the company's Jacksonville, Florida,

  16. SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Signals in the Subsurface | Department of Energy SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface Grand Challenge Workshop -Imaging Subsurface.pdf (434.52 KB) More Documents & Publications AGU SubTER Town Hall Presentation 2015 SubTER Presentation at Town Hall - American Geophysical Union Controlling Subsurface Fractures and Fluid Flow: A Basic

  17. EV Everywhere Grand Challenge: Consumer Acceptance and Charging

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Workshop Agenda | Department of Energy Agenda EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Agenda Agenda for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA agenda_caci.pdf (218.57 KB) More Documents & Publications EV Everywhere Consumer Acceptance and Charging Infrastructure Workshop - Backsplash EV Everywhere Grand Challenge:

  18. DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational

  19. Rio Grande County, Colorado: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    B. Places in Rio Grande County, Colorado Center, Colorado Del Norte, Colorado Monte Vista, Colorado South Fork, Colorado Retrieved from "http:en.openei.orgw...

  20. Sandia Energy - SunShot Grand Challenge: Regional Test Centers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Challenge: Regional Test Centers Home Videos Renewable Energy Energy Events News SunShot News & Events Photovoltaic Solar SunShot Grand Challenge: Regional Test Centers Previous...

  1. EV Everywhere Grand Challenge Kick-Off | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dearborn, MI framingworkshopagenda062112.pdf (85.02 KB) More Documents & Publications EV Everywhere Grand Challenge Overview Presentation EV Everywhere Framing Workshop - ...

  2. EV Everywhere Grand Challenge- Battery Status and Cost Reduction Prospects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by technology manager David Howell at the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL.

  3. Grand Blanc, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    5th congressional district.12 Registered Energy Companies in Grand Blanc, Michigan 21st century Green Solutions LLC References US Census Bureau Incorporated place and...

  4. EV Everywhere Grand Challenge: Consumer Acceptance and Charging...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon ...

  5. EV Everywhere Grand Challenge: Consumer Acceptance and Charging...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon ...

  6. Statement by Energy Secretary Steven Chu on Today's Grand Opening...

    Energy Savers [EERE]

    on today's grand opening of the Nordex wind turbine manufacturing facility in Jonesboro. ... to assist in the creation of a wind turbine manufacturing facility in Jonesboro, Arkansas. ...

  7. Field Studies of Geothermal Reservoirs: Rio Grande Rift, New...

    Open Energy Info (EERE)

    Abstract The Rio Grande rift provides an excellent field laboratory to study the nature of geothermal systems in an extensional environment. Much of the geologic complexity...

  8. Grand Opening of Abengoa's Biorefinery: Nation's Third Commercial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The nation's third commercial-scale cellulosic ethanol biorefinery celebrates its grand ... The plant will produce cellulosic ethanol from non-edible corn stalks, stems, and leaves ...

  9. EV Everywhere Grand Challenge Introduction for Electric Drive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation given by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, ...

  10. EV Everywhere Grand Challenge - Electric Drive (Power Electronics...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop List of ...

  11. Grand Junction, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    district.12 Registered Energy Companies in Grand Junction, Colorado Ruby Canyon Engineering Inc References US Census Bureau Incorporated place and minor civil...

  12. Alpine Extensional Detachment Tectonics In The Grande Kabylie...

    Open Energy Info (EERE)

    Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Jump to: navigation, search OpenEI Reference LibraryAdd to...

  13. Winning the Future: Grand Ronde Solar Projects Reduce Pollution...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    coastal range, the Confederated Tribes of the Grand Ronde Community of Oregon has a strong connection to the earth and nature and a deep commitment to environmental stewardship. ...

  14. Grand Rapids Public Util Comm | Open Energy Information

    Open Energy Info (EERE)

    https:www.facebook.compagesGrand-Rapids-Public-Utilities108782819203449?skwall Outage Hotline: 218-326-4806 References: EIA Form EIA-861 Final Data File for 2010 -...

  15. Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Spa Low Temperature Geothermal Facility Facility Sierra Grande Lodge Sector Geothermal energy Type Pool and Spa Location Truth or Consequences, New Mexico Coordinates 33.1284047,...

  16. City of Grand Junction, Iowa (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Iowa (Utility Company) Jump to: navigation, search Name: Grand Junction Municipal Utilities Place: Iowa Phone Number: (515) 738-2285 or (515) 738-2726 Facebook: https:...

  17. Summary of Grand Challenge Products Selected for Award Negotiations

    SciTech Connect (OSTI)

    2010-04-26

    DOE provides $13 million in funding to 48 research and development projects across the country that were selected as award winners of the Industrial Energy Efficiency Grand Challenge.

  18. A thick homogeneous vegetated cover design proves cost - and schedule-effective for the reclamation of uranium mills sites near Spokane, Washington

    SciTech Connect (OSTI)

    Blacklaw, J.; Robertson, G.; Stoffel, D.; Ahmad, J.; Fordham, E.

    1997-08-01

    The Washington State Department of Health (WDOH) has licensed two medium sized uranium mills with tailings impoundments covering 28 and 40 hectares (70 and 100 acres), respectively, The uranium mill licensees have submitted closure and reclamation plans to the state, and site-specific conditions have determined the closure design features, Conventional uranium mill cover designs usually incorporate an overall cap of one to three meters, which includes a low-permeability clay barrier layer. A technical evaluation of several uranium mill facilities that used this design was published in the fall of 1994 and reported that unexpected vegetation root damage had occurred in the low-permeability clay (or bentonite amended) barrier layers. The technical report suggested that the low-permeability design feature at some sites could be compromised within a very short time and the regulatory goal of 1,000 years performance might not be achieved. In October 1994, WDOH sponsored a technical forum meeting to consider design alternatives to address these reliability concerns. Representatives from the federal government, nuclear industry, licensees, engineering firms, and state regulatory agencies attended the workshop. Risk factors considered in the evaluation of the uranium mill reclamation plans include: (1) radon gas emanation through the cover (the air pathway), and (2) migration of hazardous and/or radioactive constituents (the groundwater pathway). Additional design considerations include site structural stability, longevity of 1,000 years, and no active (ongoing) maintenance. 9 refs.

  19. Hanford Site Black-tailed Jackrabbit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 Revision 0 Hanford Site Black-tailed Jackrabbit Monitoring Report for Fiscal Year 2013 Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Contractor for the U.S. Department of Energy under Contract DE-AC06-09RL14728 P.O. Box 650 Richland, Washington 99352 Approved for Public Release Further Dissemination Unlimited HNF- 56710 Revision 0 TRADEMARK DISCLAIMER Reference herein to any specific commercial product, process, or service by trade name,

  20. Sharp-tailed Grouse and Pygmy Rabbit Wildlife Mitigation Project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    The Proposed Action is needed to protect and enhance shrub-steppe and riparian habitat for sharp-tailed grouse (Tympanuchus phasianellus columbianus), Pygmy rabbits (Brachylagus idahoensis), and other indigenous wildlife species. The purpose of the Proposed Action is to compensate, in part, for wildlife habitat lost from the construction of Grand Coulee Dam and the inundation of Lake Roosevelt. Bonneville Power Administration proposes to fund management agreements, conservation easements, acquisition of fee title, or a combination of these on as many as 29,000 acres in Lincoln and Douglas Counties to improve shrub-steppe and riparian habitat for sharp-tailed grouse and pygmy rabbits. The BPA also proposes to fund habitat improvements (enhancements) on project lands including existing public lands. Proposed habitat treatments would include control of grazing; planting of native trees, shrubs, forbs and grasses; protection of wetlands and streambanks; herbicide use; fire prescriptions; and wildfire suppression. Proposed management activities may include predator control, population introductions, and control of crop depredation.

  1. Sharp-Tailed Grouse and Pygmy Rabbit Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    Untied States. Bonneville Power Adminsitration.

    1992-10-01

    The Proposed Action is needed to protect and enhance shrub-steppe and riparian habitat for sharp-tailed grouse (Tympanuchus phasianellus columbianus), Pygmy rabbits (Brachylagus idahoensis), and other indigenous wildlife species. The purpose of the Proposed Action is to compensate, in part, for wildlife habitat lost from the construction of Grand Coulee Dam and the inundation of Lake Roosevelt. Bonneville Power Administration proposes to fund management agreements, conservation easements, acquisition of fee title, or a combination of these on as many as 29,000 acres in Lincoln and Douglas Counties to improve shrub-steppe and riparian habitat for sharp-tailed grouse and pygmy rabbits. The BPA also proposes to fund habitat improvements (enhancements) on project lands including existing public lands. Proposed habitat treatments would include control of grazing; planting of native trees, shrubs, forbs and grasses; protection of wetlands and streambanks; herbicide use; fire prescriptions; and wildfire suppression. Proposed management activities may include predator control, population introductions, and control of crop depredation.

  2. Beneficial uses of paper mill residuals for New York State`s recycled-paper mills. Final report

    SciTech Connect (OSTI)

    1995-09-01

    This report evaluates the New York paper mill industry in terms of the productive management and treatment of solid wastes. It identifies current efforts by recycling mills to beneficially use paper mill residuals (often called sludge) and suggests additional options that should be considered by the industry in general and individual mills in particular. It also examines the regulations and economics affecting the mills and suggests actions that could improve the industry`s ability to convert wastes to value-added products. The report recommends that the mills should continue measures to reduce fiber and filler clay losses, promote the transfer of usable fiber and clay to mills able to use them, upgrade sludge dewatering capabilities, and take a more regional approach to solid waste disposal problems. State agencies are urged to support these efforts, encourage the development and commercialization of new beneficial use technologies, and reduce regulatory barriers whenever possible.

  3. DOE - Office of Legacy Management -- Slick Rock Mill Site - CO 08

    Office of Legacy Management (LM)

    Slick Rock Mill Site - CO 08 Site ID (CSD Index Number): CO.08 Site Name: Slick Rock Mill Site Site Summary: Site Link: Slick Rock, Colorado, Processing Site External Site Link: Alternate Name(s): Slick Rock Mill Site Slick Rock (North Continent) Mill 1 Slick Rock (Union Carbide) Mill 2 Uranium Mill No. 1 in Slick Rock (East) Uranium Mill No. 2 in Slick Rock (West) Alternate Name Documents: Location: San Miguel County, Colorado Location Documents: Historical Operations (describe contaminants):

  4. Geothermal Mill Redevelopment Project in Massachusetts

    SciTech Connect (OSTI)

    Vale, A.Q.

    2009-03-17

    Anwelt Heritage Apartments, LLC redeveloped a 120-year old mill complex into a mixed-use development in a lower-income neighborhood in Fitchburg, Massachusetts. Construction included 84 residential apartments rented as affordable housing to persons aged 62 and older. The Department of Energy (“DOE”) award was used as an essential component of financing the project to include the design and installation of a 200 ton geothermal system for space heating and cooling.

  5. Multifractal properties of ball milling dynamics

    SciTech Connect (OSTI)

    Budroni, M. A. Pilosu, V.; Rustici, M.; Delogu, F.

    2014-06-15

    This work focuses on the dynamics of a ball inside the reactor of a ball mill. We show that the distribution of collisions at the reactor walls exhibits multifractal properties in a wide region of the parameter space defining the geometrical characteristics of the reactor and the collision elasticity. This feature points to the presence of restricted self-organized zones of the reactor walls where the ball preferentially collides and the mechanical energy is mainly dissipated.

  6. Data Compendium for the Logging Test Pits at the ERDA Grand Junction...

    Office of Environmental Management (EM)

    Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound (December 1975) Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound ...

  7. EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project...

    Office of Environmental Management (EM)

    19: Rio Grande LNG Project and Rio Bravo Pipeline Project; Kleberg, Kenedy, Willacy, and Cameron Counties, Texas EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project; ...

  8. HERA BEAM TAIL SHAPING BY TUNE MODULATION.

    SciTech Connect (OSTI)

    MONTAG,C.

    2003-05-19

    To study CP violation, the HEM-B experiment uses an internal wire target in the transverse halo of the stored HERA proton beam. Operational experience shows that the resulting interaction rates are extremely sensitive to tiny orbit jitter amplitudes. Various methods have been studied to stabilize these interaction rates by increasing diffusion in the transverse proton beam tails without affecting the luminosity at the electron-proton collider experiments ZEUS and H1. Tune modulation was found to be a promising method for this task. Experiments performed in recent years will be reported.

  9. EV Everywhere Grand Challenge Blueprint | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere Grand Challenge Blueprint EV Everywhere Grand Challenge Blueprint Recognizing that vehicle electrification is an essential part of our countrys "all-of-the above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to enable plug-in electric vehicles (PEVs) that are as affordable and convenient for the American family as gasoline-powered vehicles by 2022. This "Blueprint" provides an outline

  10. Pulp and Paper Mills: Profiting from Efficient Motor System Use |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Pulp and Paper Mills: Profiting from Efficient Motor System Use Pulp and Paper Mills: Profiting from Efficient Motor System Use This 2-page fact sheet describes The Paper and Allied Products Industry spending to operate electric motor systems and opportunities to reduce these costs. Pulp and Paper Mills: Profiting from Efficient Motor System Use (January 1999) (70.34 KB) More Documents & Publications Bandwidth Study U.S. Pulp and Paper Manufacturing United States

  11. DOE - Office of Legacy Management -- Marion Mill Site - CO 09

    Office of Legacy Management (LM)

    Mill Site - CO 09 FUSRAP Considered Sites Site: MARION MILL SITE (CO.09 ) Eliminated from further consideration under FUSRAP - deferred to the State of Colorado for appropriate action. Designated Name: Not Designated Alternate Name: None Location: Sugar Leaf Road , Boulder , Colorado CO.09-1 Evaluation Year: Circa 1983 CO.09-1 Site Operations: Milled and processed thorite and other rare earth ores in 1957 and 1958. Some of the thorium concentrate produced was shipped to Davison Chemical Company

  12. DOE - Office of Legacy Management -- Uravan Mill Site - CO 02

    Office of Legacy Management (LM)

    Uravan Mill Site - CO 02 FUSRAP Considered Sites Site: Uravan Mill Site (CO.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Uravan Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data Validation

  13. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Shiprock, New Mexico

    SciTech Connect (OSTI)

    Hill, T.V.; Morley, J.A. . Uranium Mill Tailings Remedial Action Project Office); Began, E.T. )

    1985-06-01

    This Remedial Action Plan (RAP) has been developed to serve a twofold purpose. It presents the series of activities which are proposed by the Department of Energy (DOE) to effect long-term control of radioactive materials at the inactive uranium processing site located on the Navajo Reservation at Shiprock, New Mexico. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Shiprock site. Detailed supporting information can be found in appendices and referenced documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 traces the history of operations at the Shiprock site with a description of the present site characteristics. Section 4.0 provides a definition of site-specific problems, a listing of remedial action alternatives which have been considered, and the action which is being proposed. Section 5.0 presents a summary of the conceptual design for the proposed action which includes objectives, design features, schedule, cost, and implementation methods. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the onsite workers. Section 7.0 presents a detailed listing of the responsibilities of the project participants. Section 8.0 describes the quality assurance process that will be used by the RAC during construction. Section 9.0 describes the features of the long-term maintenance and surveillance plan. Section 10.0 documents the on-going activities to keep the public informed and participating in the project. Attached as part of the RAP are five appendices which describe in more detail various aspects of the remedial action.

  14. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project.

  15. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This volume contains Appendix F, bid schedule and specifications for remedial action on three sites: Old Rifle processing site; New Rifle processing site and Estes Gulch disposal site.

  16. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lowman, Idaho

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The DOE proposes to achieve compliance with the proposed EPA groundwater protection standards (Subparts A and B of 40 CFR 192) by meeting the EPA maximum concentration limits (MCLs) or background concentrations for designated hazardous constituents in groundwater in the uppermost aquifer (alluvium/weathered granodiorite) at the point of compliance (POC) at the Lowman disposal site near Lowman, Idaho. The proposed remedial action in conjunction with existing hydrogeological conditions at the Lowman site will ensure sufficient protection of human health and the environment. The DOE has concluded that the EPA groundwater protection standards will be met at the POC because, with the exception of antimony, none of the hazardous constituents that exceed laboratory method detection limits within the radioactive sand pore fluids were above the proposed concentration limits. The DOE has demonstrated that antimony will meet the proposed concentration limits at the POC through attenuation in subsoils beneath the disposal cell and by dilution in groundwater underflow. The Lowman processing site is in compliance with Subpart B of 40 CFR 192 because statistical analyses of groundwater samples indicate no groundwater contamination.

  17. Uranium Mill Tailings Remedial Action Project (UMTRAP), Slick Rock, Colorado, Revision 1. Bid schedule, special conditions, specifications, and subcontract drawings

    SciTech Connect (OSTI)

    1995-10-01

    This volume contains: bidding requirements; terms and conditions; specifications for Division 1 -- general requirements; specifications for Division 2 -- sitework; specifications for Divisions 5 -- metals; subcontract drawings, (general, Union Carbide processing site, North Continent processing site, and Burro Canyon disposal site).

  18. Uranium Mill Tailings Remedial Action Project (UMTRAP), Slick Rock, Colorado, Revision 1. Volume 2, Calculations, Final design for construction

    SciTech Connect (OSTI)

    1995-09-01

    Volume two contains calculations for: embankment design--slope stability analysis; embankment design--excavation stability; embankment design--settlement and cover cracking analysis; radon barrier design--statistical analysis of ra-226 concentrations for North Continent and Union Carbide sites; radon barrier design--RAECOM input data; radon barrier design--design thickness; and cover design--frost penetration depth.

  19. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume II

    SciTech Connect (OSTI)

    1996-10-01

    Volume II of the programmatic environmental impact statement (PElS) is a comment and response document; it is the collection of the comments received on the draft PElS. The U.S. Department of Energy's (DOE) response to each comment is provided after each comment. If the comment resulted in a change to the PElS, the affected section number of the PElS is provided in the response. Comments 1 through 259 were received at public hearings. The name of the hearing at which the comment was received is listed after each comment. Comments were recorded on flip charts and by notetakers. DOE representatives were present to hear the comments and respond to them. The DOE's written response is provided after each comment. Comments 260 through 576 were received in writing at the hearings, and from various federal, tribal, and state agencies and from individuals during the public comment period. Copies of the written comments follow the comments and responses.

  20. Energy Department Recognizes General Mills for Leadership and...

    Office of Environmental Management (EM)

    the nation's buildings and manufacturing plants, today the U.S. Department of Energy ... Through the Energy Department's Better Plants Challenge, General Mills has committed to 20 ...

  1. East Millinocket Mill Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Mill Sector Biomass Location Penobscot County, Maine Coordinates 45.3230777, -68.5806727 Show Map Loading map... "minzoom":false,"mappingservice":"googlemaps3","type"...

  2. Cedar Mill, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Mill, Oregon: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 45.5048397, -122.7984325 Show Map Loading map... "minzoom":false,"mappingservice"...

  3. Nahar Spinning Mills Ltd NSML | Open Energy Information

    Open Energy Info (EERE)

    (NSML) Place: Ludhiana, Punjab, India Zip: 141 003 Product: Ludhiana-based spinning mill with cogeneration activities. Coordinates: 30.89314, 75.86938 Show Map Loading...

  4. Bay Mills Indian Community Energy Reduction Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tribal Council of Michigan, Inc. Environmental Services Division Chris Kushman Bay Mills Indian Community Energy Reduction Feasibility Study *DOE Tribal Energy Program *Tribal ...

  5. SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Grand Challenge Workshop -Imaging Subsurface.pdf More Documents & Publications AGU SubTER Town Hall Presentation 2015 SubTER Fact Sheet SubTER Presentation at Town Hall - ...

  6. City of Grand Rapids- Green Power Purchasing Policy

    Broader source: Energy.gov [DOE]

    In 2005, the City of Grand Rapids established a goal of purchasing 20% of its municipal power demand from renewable energy by 2008. In November 2007, the city signed a three-year agreement with a...

  7. EV Everywhere Grand Challenge - Battery Status and Cost Reduction...

    Broader source: Energy.gov (indexed) [DOE]

    Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL. 5howellb.pdf (1.24 MB) More Documents & Publications PHEV Battery Cost Assessment ...

  8. EV Everywhere Grand Challenge - Battery Workshop attendees list...

    Broader source: Energy.gov (indexed) [DOE]

    Attendance list for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree OHare, Chicago, IL. companiesinattendanceb.pdf (149.45 KB) More ...

  9. 2014 SunShot Grand Challenge Summit Opening Session Photos |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Anaheim Mayor Tom Tait with SunShot Director Minh Le Credit: SunShot Initiative Date ... SunShot Grand Challenge Summit Opening Session SunShot Director Minh Le Credit: SunShot ...

  10. EV Everywhere Grand Challenge Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3_davis_caci.pdf (591.63 KB) More Documents & Publications EV Everywhere Framing Workshop Report Out & Lessons Learned EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Grand Challenge - Charge to the Breakout Groups

  11. EA-1037: Uranium Lease Management Program, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve the nation's immediately accessible supply of...

  12. Grand Forks County, North Dakota: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Dakota. Its FIPS County Code is 035. It is classified as ASHRAE 169-2006 Climate Zone Number 7 Climate Zone Subtype A. Registered Energy Companies in Grand Forks County, North...

  13. EV Everywhere Grand Challenge Introduction for Electric Drive Workshop

    Broader source: Energy.gov [DOE]

    Presentation given by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, 2012 held at the Doubletree O'Hare, Chicago, IL.

  14. Evaluation of Geothermal Potential of Rio Grande Rift and Basin...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Evaluation of Geothermal Potential of Rio Grande Rift and Basin and Range Province, New Mexico Abstract A...

  15. Arroyo Grande, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    This article is a stub. You can help OpenEI by expanding it. Arroyo Grande is a city in San Luis Obispo County, California. It falls under California's 22nd congressional...

  16. Grand Opening for Project LIBERTY: Nation's First Plant to Use...

    Energy Savers [EERE]

    for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock August 28, 2014 ...

  17. Casa Grande, Arizona: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Casa Grande is a city in Pinal County, Arizona. It falls under Arizona's 1st congressional...

  18. Fernald Preserve Visitors Center Grand Opening and LEED Platinum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certification | Department of Energy Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to

  19. SubTER Grand Challenge Roundtable: Imaging Geophysical and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface The Grand Challenge SubTER Panel (Dr. Marcia McNutt, Chair) DOE Leads: Margaret Coleman, Julio Friedmann, Doug Hollett, and Harriet Kung Introduction The future of the world's energy production and deployment is closely tied to our understanding of the subsurface, as well as our capabilities in subsurface or geologic engineering. Developments over the past ten years, including the growth of natural

  20. EV Everywhere Grand Challenge - Charging Infrastructure Enabling Flexible

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Design | Department of Energy Charging Infrastructure Enabling Flexible EV Design EV Everywhere Grand Challenge - Charging Infrastructure Enabling Flexible EV Design Presentation given at the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA 5_slezak_caci.pdf (2 MB) More Documents & Publications EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Framing

  1. EV Everywhere Grand Challenge - Electric Drive (Power Electronics and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Machines) Workshop | Department of Energy - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop List of companies in attendance at the Electric Drive Workshop held on July 24, 2012 at the Doubletree O'Hare, Chicago, IL companies_in_attendance_ed.pdf (145.65 KB) More Documents & Publications EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV

  2. Montage Builders Northern Forest, Ryerson University Selected as Grand

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Winners of First Student Design Competition for Zero Energy Ready Homes | Department of Energy Montage Builders Northern Forest, Ryerson University Selected as Grand Winners of First Student Design Competition for Zero Energy Ready Homes Montage Builders Northern Forest, Ryerson University Selected as Grand Winners of First Student Design Competition for Zero Energy Ready Homes April 29, 2014 - 2:15pm Addthis To help cut energy waste and improve U.S. energy productivity, the Energy

  3. Technical basis for radiological release of Grand Junction Office Building 2. Volume 1, dose assessment

    SciTech Connect (OSTI)

    Morris, R.; Warga, J.; Thorne, D.

    1997-07-01

    Building 2 on the US Department of Energy (DOE) Grand Junction Office (GJO) site is part of the GJO Remedial Action Program (GJORAP). During evaluation of Building 2 for determination of radiological release disposition, some inaccessible surface contamination measurements were detected to be greater than the generic surface contamination guidelines of DOE Order 5400.5 (which are functionally equivalent to US Nuclear Regulatory Commission [NRC] Regulatory Guide 1.86). Although the building is nominal in size, it houses the site telecommunications system, that is critical to continued GJO operations, and demolition is estimated at $1.9 million. Because unrestricted release under generic surface contamination guidelines is cost-prohibitive, supplemental standards consistent with DOE Order 5400.5 are being pursued. This report describes measurements and dose analysis modeling efforts to evaluate the radiation dose to members of the public who might occupy or demolish Building 2, a 2,480 square-foot (ft) building constructed in 1944. The north portion of the building was used as a shower facility for Manhattan Project uranium-processing mill workers and the south portion was a warehouse. Many originally exposed surfaces are no longer accessible for contamination surveys because expensive telecommunications equipment have been installed on the floors and mounted on panels covering the walls. These inaccessible surfaces are contaminated above generic contamination limits.

  4. EA-1338: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts for the proposed transfer of real and personal property at the U.S. Department of Energy's Grand Junction Office to non-DOE ownership.

  5. PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy -1 and EA-33-A Rio Grande Electric Cooperative Inc PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc Rescission of Presidential Permit and Electricity Export Authorization for Rio Grande Electric Cooperative to Export electricity to Mexico. PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc (52.93 KB) More Documents & Publications EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. PP-53 Rio Grande Electric Cooperative, Inc. PP-33 Rio Grande Electric Cooperative

  6. Otter Tail Power Company- Commercial & Industrial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Information regarding rebate program eligibility and product and equipment requirements may be found on the web site listed above. Contact Otter Tail Power Company for more information on this ...

  7. Otter Tail Ag Enterprises LLC | Open Energy Information

    Open Energy Info (EERE)

    Enterprises LLC Jump to: navigation, search Name: Otter Tail Ag Enterprises LLC Place: Fergua Falls, Minnesota Zip: 56537-7518 Product: Developed a 55m gallon ethanol facility in...

  8. Western Red-tailed Skink Distribution in Southern Nevada

    SciTech Connect (OSTI)

    Hall, D. B. and Gergor, P. D.

    2011-11-01

    This slide show reports a study to: determine Western Red-tailed Skink (WRTS) distribution on Nevada National Security Site (NNSS); identify habitat where WRTS occur; learn more about WRTS natural history; and document distribution of other species.

  9. Otter Tail Power Company - Dollar Smart Financing Program | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Customers who have satisfactory 12-month payment histories with Otter Tail or another utility may use the 8.5% interest rate loan to finance purchases of new electric...

  10. A note on trans-Planckian tail effects

    SciTech Connect (OSTI)

    Graef, L.L.; Brandenberger, R.

    2015-09-09

    We study the proposal by Mersini et al. http://dx.doi.org/10.1103/PhysRevD.64.043508 that the observed dark energy might be explained by the back-reaction of the set of tail modes in a theory with a dispersion relation in which the mode frequency decays exponentially in the trans-Planckian regime. The matter tail modes are frozen out, however they induce metric fluctuations. The energy-momentum tensor with which the tail modes effect the background geometry obtains contributions from both metric and matter fluctuations. We calculate the equation of state induced by the tail modes taking into account the gravitational contribution. We find that, in contrast to the case of frozen super-Hubble cosmological fluctuations, in this case the matter perturbations dominate, and they yield an equation of state which to leading order takes the form of a positive cosmological constant.

  11. Otter Tail Power Company- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Information regarding rebate program eligibility and product and equipment requirements may be found on the web site listed above. Contact Otter Tail Power Company for more information on this pr...

  12. PSR J0357+3205: THE TAIL OF THE TURTLE

    SciTech Connect (OSTI)

    Marelli, M.; De Luca, A.; Salvetti, D.; Sartore, N.; Sartori, A.; Caraveo, P.; Pizzolato, F.; Belfiore, A.; Saz Parkinson, P. M.

    2013-03-01

    Using a new XMM-Newton observation, we have characterized the X-ray properties of the middle-aged radio-quiet {gamma}-ray pulsar J0357+3205 (named Morla) and its tail. The X-ray emission from the pulsar is consistent with a magnetospheric non-thermal origin plus a thermal emission from a hot spot (or hot spots). The lack of a thermal component from the whole surface makes Morla the coldest neutron star in its age range. We found marginal evidence for a double-peaked modulation of the X-ray emission. The study of the 9' long tail confirmed the lack of extended emission near the pulsar itself. The tail shows a very asymmetric brightness profile and its spectrum lacks any spatial variation. We found the nebular emission to be inconsistent with a classical bow shock, ram-pressure-dominated pulsar wind nebula. We propose thermal bremsstrahlung as an alternative mechanism for Morla's tail emission. In this scenario, the tail emission comes from the shocked interstellar medium (ISM) material heated up to X-ray temperatures. This can fully explain the peculiar features of the tail, assuming a hot, moderately dense ISM around the pulsar. For a bremsstrahlung-emitting tail, we can estimate the pulsar distance to be between 300 and 900 pc. A pulsar velocity of {approx}1900 km s{sup -1} is required, which would make Morla the pulsar with the largest velocity, and high inclination angles (>70 Degree-Sign ) are preferred. We propose Morla's nebula as the first example of a new 'turtle's tail' class of thermally emitting nebulae associated with high-velocity pulsars.

  13. Mill City, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    is a stub. You can help OpenEI by expanding it. Mill City is a city in Linn County and Marion County, Oregon. It falls under Oregon's 4th congressional district and Oregon's 5th...

  14. Spring Mills, Pennsylvania: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Spring Mills is a census-designated place in Centre County, Pennsylvania.1 References ...

  15. Kemp Mill, Maryland: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    stub. You can help OpenEI by expanding it. Kemp Mill is a census-designated place in Montgomery County, Maryland.1 References US Census Bureau 2005 Place to 2006 CBSA...

  16. Mill Valley, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Mill Valley is a city in Marin County, California. It falls under California's 6th...

  17. Anderson Mill, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Anderson Mill is a census-designated place in Travis County and Williamson County, Texas.1...

  18. Grand Traverse Band of Ottawa and Chippewa Indians- 2005 Project

    Broader source: Energy.gov [DOE]

    The Grand Traverse Band of Ottawa and Chippewa Indians (GTB) will conduct a feasibility study to determine the cost effectiveness and other economic, environmental, cultural, and social benefits of maximizing the diversity of energy sources used at GTB facilities. This includes an assessment of energy conservation measures as well as renewable energy sources such as wind, solar, and biomass.

  19. Mesa Grande Band of Mission Indians- 2004 Project

    Broader source: Energy.gov [DOE]

    The Mesa Grande Band of Mission Indians, located in northern San Diego County, will conduct a study of the feasibility of reducing air pollution generated on the reservation by an over-reliance on wood-burning stoves, kerosene heaters, and gasoline generators, and to identify the types of renewable energy systems that could be used for residential structures and well-pump systems.

  20. SunShot Grand Challenge Summit and Peer Review 2014

    Broader source: Energy.gov [DOE]

    The 2014 SunShot Grand Challenge Summit and Peer Review brought together more than 800 members of the solar community to review the progress made toward the SunShot goal and discuss the challenges ahead to make solar energy more affordable and widespread across America. Download the Summit conference presentations here.

  1. Biomass Burner Cogenerates Jobs and Electricity from Lumber Mill Waste |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Burner Cogenerates Jobs and Electricity from Lumber Mill Waste Biomass Burner Cogenerates Jobs and Electricity from Lumber Mill Waste December 6, 2011 - 3:57pm Addthis Dale and Sharon Borgford, small business owners in Stevens County, WA, break ground with Peter Goldmark, Washington State Commissioner of Public Lands. The pair brought more than 75 jobs to the area with help from DOE's State Energy Program and the U.S. Forest Service. | Photo courtesy of Washington DNR.

  2. DOE - Office of Legacy Management -- Loma Mill - CO 03

    Office of Legacy Management (LM)

    Loma Mill - CO 03 FUSRAP Considered Sites Site: Loma Mill (CO.03 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC

  3. Summer 2011 Intern Project- Carolyn Mills | Center for Energy Efficient

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Materials Carolyn Mills ELECTRICITY FROM HEAT: SYNTHESIS AND INVNESTIGATION OF INTERMETALLIC HETEROSTRUCTURES Carolyn Mills Chemical Engineering UC Santa Barbara Mentor: Christina Birkel Faculty Advisor: Galen Stucky Department: Chemistry and Biochemistry Thermoelectric materials have the ability to convert between thermal and electrical energies. However, to maximize ZT, the thermoelectric figure of merit, a material must have a high Seebeck coefficient and a high electrical conductivity

  4. DOE - Office of Legacy Management -- Tuba City Mill Site - AZ 0-02

    Office of Legacy Management (LM)

    Mill Site - AZ 0-02 Site ID (CSD Index Number): AZ.0-02 Site Name: Tuba City Mill Site Site Summary: Site Link: Tuba City, Arizona, Disposal Site External Site Link: Alternate Name(s): Tuba City Mill Site Uranium Mill in Tuba City Alternate Name Documents: Location: Tuba City, Arizona, Navajo Nation Location Documents: Historical Operations (describe contaminants): Rare Metals Corporation and its successor, El Paso Natural Gas Company, operated a uranium mill at the site between 1956 and 1966.

  5. EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. Order authorizing Rio Grande Electric Cooperative, Inc to export electric energy to Mexico PDF icon EA-33-A and PP-33-1 ...

  6. Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22...

    Broader source: Energy.gov (indexed) [DOE]

    2014 SunShot Grand Challenge Summit and Peer Review SunShot Grand Challenge Summit Opening Session Energy Department Announces New Prize Challenge to Drive Down Solar Costs

  7. Media Invitation: 2014 SunShot Grand Challenge Summit and Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review April 14, 2014 - 4:27pm Addthis Media ...

  8. Solar Community Comes Out in Full Force for SunShot Grand Challenge...

    Energy Savers [EERE]

    Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit May 22, 2014 - 9:58am Addthis ...

  9. The emerging multi-polar world and China's grand game (Journal...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: The emerging multi-polar world and China's grand game Citation Details In-Document Search Title: The emerging multi-polar world and China's grand game You are ...

  10. Compressed Air System Optimization Saves Energy and Improves Production at a Textile Manufacturing Mill (Peerless Division, Thomastown Mills, Inc.)

    SciTech Connect (OSTI)

    2001-06-01

    This case study is one in a series on industrial firms who are implementing energy efficient technologies and system improvements into their manufacturing processes. This case study documents the activities, savings, and lessons learned on the textile manufacturing mill project.

  11. Grand Traverse Band Renewable Energy Feasibility Study in Wind, Biomass and Solar

    SciTech Connect (OSTI)

    Suzanne McSawby, Project Director Steve Smiley, Principle Investigator Grand Traverse Resort, Cost Sharing Partner

    2008-12-31

    Renewable Energy Feasibility Study for wind, biomass, solar on the Grand Traverse Band tribal lands from 2005 - 2008

  12. SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spectrum | Department of Energy Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum June 13, 2012 - 5:30pm Addthis Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by Dennis Schroeder/NREL. Energy Secretary Steven Chu gives the keynote address at the SunShot Grand Challenge Summit in Denver, Colorado. | Photo by

  13. SunShot Grand Challenge: Summit and Technology Forum | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grand Challenge: Summit and Technology Forum SunShot Grand Challenge: Summit and Technology Forum The SunShot Grand Challenge: Summit and Technology Forum was the first event in a series of Department of Energy Grand Challenges. This event focused on SunShot Initiative goals of achieving grid-parity solar energy within the decade. The SunShot Summit and Technology Forum included: Plenary sessions featuring Energy Secretary Steven Chu and other industry leaders Group discussions focusing on the

  14. Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Grand Ronde Solar Projects Reduce Pollution, Cut Costs Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs October 20, 2014 - 5:00pm Addthis PV panels installed on Grand Ronde Tribal Housing Authority carport. Photo from GRTHA, NREL 31797 PV panels installed on Grand Ronde Tribal Housing Authority carport. Photo from GRTHA, NREL 31797 Challenge: Situated on nearly 12,000 acres in the heart of Western Oregon's scenic coastal range, the

  15. August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site

    Office of Legacy Management (LM)

    Sampling at the Grand Junction, Colorado, Disposal Site October 2015 LMS/GRJ/S00815 This page intentionally left blank U.S. Department of Energy DVP-August 2015, Grand Junction, Colorado October 2015 RIN 15077245 Page i Contents Sampling Event Summary ...............................................................................................................1 Grand Junction, Colorado, Disposal Site, Sample Location Map ...................................................3 Data Assessment

  16. January 2016 Groundwater and Surface Water Sampling at the Grand Junction, Colorado, Processing Site

    Office of Legacy Management (LM)

    6 Groundwater and Surface Water Sampling at the Grand Junction, Colorado, Processing Site March 2016 LMS/GJT/S00116 This page intentionally left blank U.S. Department of Energy DVP-January 2016, Grand Junction, Colorado March 2016 RIN 15127576 Page i Contents Sampling Event Summary ...............................................................................................................1 Grand Junction, Colorado, Processing Site, Sample Location Map

  17. Environmental control technology for mining, milling, and refining thorium

    SciTech Connect (OSTI)

    Weakley, S.A.; Blahnik, D.E.; Young, J.K.; Bloomster, C.H.

    1980-02-01

    The purpose of this report is to evaluate, in terms of cost and effectiveness, the various environmental control technologies that would be used to control the radioactive wastes generated in the mining, milling, and refining of thorium from domestic resources. The technologies, in order to be considered for study, had to reduce the radioactivity in the waste streams to meet Atomic Energy Commission (10 CFR 20) standards for natural thorium's maximum permissible concentration (MPC) in air and water. Further regulatory standards or licensing requirements, either federal, state, or local, were not examined. The availability and cost of producing thorium from domestic resources is addressed in a companion volume. The objectives of this study were: (1) to identify the major waste streams generated during the mining, milling, and refining of reactor-grade thorium oxide from domestic resources; and (2) to determine the cost and levels of control of existing and advanced environmental control technologies for these waste streams. Six potential domestic deposits of thorium oxide, in addition to stockpiled thorium sludges, are discussed in this report. A summary of the location and characteristics of the potential domestic thorium resources and the mining, milling, and refining processes that will be needed to produce reactor-grade thorium oxide is presented in Section 2. The wastes from existing and potential domestic thorium oxide mines, mills, and refineries are identified in Section 3. Section 3 also presents the state-of-the-art technology and the costs associated with controlling the wastes from the mines, mills, and refineries. In Section 4, the available environmental control technologies for mines, mills, and refineries are assessed. Section 5 presents the cost and effectiveness estimates for the various environmental control technologies applicable to the mine, mill, and refinery for each domestic resource.

  18. 2014 SunShot Grand Challenge Summit Opening Session Photos | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Opening Session Photos 2014 SunShot Grand Challenge Summit Opening Session Photos Addthis SunShot Grand Challenge Summit Opening Session 1 of 35 SunShot Grand Challenge Summit Opening Session Anaheim Mayor Tom Tait with SunShot Director Minh Le Credit: SunShot Initiative Date taken: 2014-05-19 16:01 SunShot Grand Challenge Summit Opening Session 2 of 35 SunShot Grand Challenge Summit Opening Session SunShot Director Minh Le Credit: SunShot Initiative Date taken: 2014-05-19 16:06

  19. City of Grand Rapids Building Solar Roof Demonstration

    SciTech Connect (OSTI)

    DeClercq, Mark; Martinez, Imelda

    2012-08-31

    Grand Rapids, Michigan is striving to reduce it environmental footprint. The municipal government organization has established environmental sustainability policies with the goal of securing 100% of its energy from renewable sources by 2020. This report describes the process by which the City of Grand Rapids evaluated, selected and installed solar panels on the Water/Environmental Services Building. The solar panels are the first to be placed on a municipal building. Its new power monitoring system provides output data to assess energy efficiency and utilization. It is expected to generate enough clean solar energy to power 25 percent of the building. The benefit to the public includes the economic savings from reduced operational costs for the building; an improved environmentally sustainable area in which to live and work; and increased knowledge about the use of solar energy. It will serve as a model for future energy saving applications.

  20. SunShot Grand Challenge Summit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Grand Challenge Summit Online registration is now closed Online registration is now closed Limited onsite registration is available. Learn more. Read more Resources for Summit Attendees Resources for Summit Attendees Plan your Summit experience today by accessing event schedules, venue information and more. Read more Exciting Keynotes, Plenary Sessions, Industry Workshops, Technology Forum and Peer Review Exciting Keynotes, Plenary Sessions, Industry Workshops, Technology Forum and Peer

  1. Upper Rio Grande Simulation Model (URGSiM)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upper Rio Grande Simulation Model (URGSiM) - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management

  2. SunShot Grand Challenge Summit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Grand Challenge Summit Online registration is now closed Online registration is now closed Limited onsite registration is available. Learn more. Read more Resources for Summit Attendees Resources for Summit Attendees Plan your Summit experience today by accessing event schedules, venue information and more. Read more Exciting Keynotes, Plenary Sessions, Industry Workshops, Technology Forum and Peer Review Exciting Keynotes, Plenary Sessions, Industry Workshops, Technology Forum and Peer

  3. Climate-Science Computational End Station Development and Grand Challenge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Team | Argonne Leadership Computing Facility Total precipitable water, a measure of how much moisture is in the air from a single moment in time in the global simulation of the atmosphere at a resolution of half a degree of latitude. (Figure provided by Mark Taylor, Sandia National Laboratories.) Figure provided by Mark Taylor, Sandia National Laboratories. Climate-Science Computational End Station Development and Grand Challenge Team PI Name: Warren Washington, Tom Bettge PI Email:

  4. Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.

    SciTech Connect (OSTI)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

  5. Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.

    SciTech Connect (OSTI)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

  6. Analyzing the performance of diamond-coated micro end mills.

    SciTech Connect (OSTI)

    Torres, C. D.; Heaney, P. J.; Sumant, A. V.; Hamilton, M. A.; Carpick, R. W.; Pfefferkorn, F. E.; Univ. of Wisconsin at Madison; Univ. of Pennsylvania

    2009-06-01

    A method is presented to improve the tool life and cutting performance of 300 {micro}m diameter tungsten carbide (WC) micro end mills by applying thin (<300 nm) fine-grained diamond (FGD) and nanocrystalline diamond (NCD) coatings using the hot-filament chemical vapor deposition (HF-CVD) process. The performance of the diamond-coated tools has been evaluated by comparing their performance in dry slot milling of 6061-T6 aluminum against uncoated WC micro end mills. Tool wear, coating integrity, and chip morphology were characterized using SEM and white light interferometry. The initial test results show a dramatic improvement in the tool integrity (i.e., corners not breaking off), a lower wear rate, no observable adhesion of aluminum to the diamond-coated tool, and a significant reduction in the cutting forces (>50%). Reduction of the cutting forces is attributed to the low friction and adhesion of the diamond coating. However, approximately 80% of the tools coated with the larger FGD coatings failed during testing due to delamination. Additional machining benefits were attained for the NCD films, which was obtained by using a higher nucleation density seeding process for diamond growth. This process allowed for thinner, smaller grained diamond coatings to be deposited on the micro end mills, and enabled continued operation of the tool even after the integrity of the diamond coating had been compromised. As opposed to the FGD-coated end mills, only 40% of the NCD-tools experienced delamination issues.

  7. Enhanced window breakdown dynamics in a nanosecond microwave tail pulse

    SciTech Connect (OSTI)

    Chang, Chao; Zhu, Meng; Li, Shuang; Xie, Jialing; Yan, Kai; Luo, Tongding; Zhu, Xiaoxin; Verboncoeur, John

    2014-06-23

    The mechanisms of nanosecond microwave-driven discharges near a dielectric/vacuum interface were studied by measuring the time- and space-dependent optical emissions and pulse waveforms. The experimental observations indicate multipactor and plasma developing in a thin layer of several millimeters above interface. The emission brightness increases significantly after main pulse, but emission region widens little. The mechanisms are studied by analysis and simulation, revealing intense ionization concentrated in a desorbed high-pressure layer, leading to a bright light layer above surface; the lower-voltage tail after main pulse contributes to heat electron energy tails closer to excitation cross section peaks, resulting in brighter emission.

  8. Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-06-01

    The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

  9. Particle size and shape distributions of hammer milled pine

    SciTech Connect (OSTI)

    Westover, Tyler Lott; Matthews, Austin Colter; Williams, Christopher Luke; Ryan, John Chadron Benjamin

    2015-04-01

    Particle size and shape distributions impact particle heating rates and diffusion of volatized gases out of particles during fast pyrolysis conversion, and consequently must be modeled accurately in order for computational pyrolysis models to produce reliable results for bulk solid materials. For this milestone, lodge pole pine chips were ground using a Thomas-Wiley #4 mill using two screen sizes in order to produce two representative materials that are suitable for fast pyrolysis. For the first material, a 6 mm screen was employed in the mill and for the second material, a 3 mm screen was employed in the mill. Both materials were subjected to RoTap sieve analysis, and the distributions of the particle sizes and shapes were determined using digital image analysis. The results of the physical analysis will be fed into computational pyrolysis simulations to create models of materials with realistic particle size and shape distributions. This milestone was met on schedule.

  10. Milling of Sand Blocks to Make Casting Moulds

    SciTech Connect (OSTI)

    Lopez de Lacalle, L. N.; Rodriguez, A.; Lamikiz, A.; Penafiel, F. J. [Department of Mechanical Engineering, University of the Basque Country, ETSII, c/Alameda de Urquijo s/n, 48013 Bilbao (Spain)

    2011-01-17

    In this paper a full procedure to make moulds in sand for direct casting of metallic parts is presented. The technology aims at unique pieces or art pieces, where only one prototype or components is required, but lead times are much reduced. The key of the procedure is to achieve enough tool life when milling with carbide tools, avoiding the risk of sand destruction or damage.The use of inverse techniques is a common input due to the industrial sectors where the direct milling is interesting. Two examples of moulds are presented, evaluating times and costs. A special study of tool wear is also presented.

  11. Fermentation and chemical treatment of pulp and paper mill sludge

    DOE Patents [OSTI]

    Lee, Yoon Y; Wang, Wei; Kang, Li

    2014-12-02

    A method of chemically treating partially de-ashed pulp and/or paper mill sludge to obtain products of value comprising taking a sample of primary sludge from a Kraft paper mill process, partially de-ashing the primary sludge by physical means, and further treating the primary sludge to obtain the products of value, including further treating the resulting sludge and using the resulting sludge as a substrate to produce cellulase in an efficient manner using the resulting sludge as the only carbon source and mixtures of inorganic salts as the primary nitrogen source, and including further treating the resulting sludge and using the resulting sludge to produce ethanol.

  12. Longest-Serving Active Paper Mill in the Western United States...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Longest-Serving Active Paper Mill in the Western United States Uncovers New Ways to Save Energy Longest-Serving Active Paper Mill in the Western United States Uncovers New Ways to ...

  13. Metastable vacuum decay in center-stabilized Yang-Mills theory...

    Office of Scientific and Technical Information (OSTI)

    Metastable vacuum decay in center-stabilized Yang-Mills theory at large N Prev Next Title: Metastable vacuum decay in center-stabilized Yang-Mills theory at large N Authors: ...

  14. EERE Success Story-From Flour to Grits, a Water-Powered Mill...

    Energy Savers [EERE]

    From Flour to Grits, a Water-Powered Mill Keeps on Grinding EERE Success Story-From Flour to Grits, a Water-Powered Mill Keeps on Grinding July 7, 2015 - 12:15pm Addthis EERE ...

  15. Head-Tail Modes for Strong Space Charge

    SciTech Connect (OSTI)

    Burov, Alexey

    2008-12-01

    Head-tail modes are described here for the space charge tune shift significantly exceeding the synchrotron tune. General equation for the modes is derived. Spatial shapes of the modes, their frequencies, and coherent growth rates are explored. The Landau damping rates are also found. Suppression of the transverse mode coupling instability by the space charge is explained.

  16. New Y-12 Mill Supports Non-Proliferation | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Mill Supports Non-Proliferation November 09, 2010 Microsoft Office document icon NR-11-09

  17. DOE - Office of Legacy Management -- Durango Mill Site - CO 0-05

    Office of Legacy Management (LM)

    Durango Mill Site - CO 0-05 Site ID (CSD Index Number): CO.0-05 Site Name: Durango Mill Site Site Summary: Site Link: Durango, Colorado, Processing Site External Site Link: Alternate Name(s): Durango Mill Site Uranium Mill in Durango Alternate Name Documents: Location: Durango, Colorado Location Documents: Historical Operations (describe contaminants): Historical Operations Documents: Eligibility Determination: Eligibility Determination Documents: Radiological Surveys Conducted (List of

  18. DOE - Office of Legacy Management -- Belfield Mill Site - ND 0-01

    Office of Legacy Management (LM)

    Belfield Mill Site - ND 0-01 FUSRAP Considered Sites Site: Belfield Mill Site (ND.0-01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.em.doe.gov/SiteInfo/BelfieldAshingFacility.aspx Documents Related to Belfield Mill Site

  19. DOE - Office of Legacy Management -- Bowman Mill Site - ND 0-02

    Office of Legacy Management (LM)

    Bowman Mill Site - ND 0-02 FUSRAP Considered Sites Site: Bowman Mill Site (ND.0-02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.em.doe.gov/SiteInfo/BowmanAshingFacility.aspx Documents Related to Bowman Mill Site

  20. Improved energy efficiency in a specialty paper mill

    SciTech Connect (OSTI)

    Smith, C.D. Jr.

    1986-06-01

    Energy costs at the James River KVP mill have increased sixfold since the 1973 oil embargo. The cost of energy now surpasses the cost of labor and is second only to that of pulp. Economic pressures thus provide a powerful incentive for efficient use of energy. The KVP mill is a nonintegrated mill that is capable of producing up to 450 tons/day of specialty papers. The mill is equipped with six paper machines, six parchment machines, three off-machine coaters, and related converting equipment. Energy is supplied by a central powerhouse that is equipped with: Two gas/oil-fired Combustion Engineering VU50 power boilers, each capable of producing 210,000 lb/h of 850-psig steam at 825/sup 0/F; One gas/oil-fired Riley water tube boiler capable of producing 150,000 lb/h of 220-psig steam at 525/sup 0/F; Two General Electric turbine generators. No. 5 condensing machine: throttle steam, 850 psig; high-pressure extraction, 220 psig; low-pressure extraction, 220 psig; low-pressure extraction, 38 psig; maximum generation, 9500 kW. No. 6 condensing machine: throttle steam, 850 psig; low-pressure extraction, 38 psig; maximum generation, 9500 kW.

  1. Woolen mill captures exhaust to cut fuel costs

    SciTech Connect (OSTI)

    Not Available

    1986-02-01

    To keep ahead of growing competition, a northeast woolen mill sought a method of reducing fuel costs while increasing production. A counterflow-design plate heat exchanger was employed to recirculate dryer exhaust. It has cut propane consumption from 4900 to 2400 gallons a week while design modifications have doubled dryer speed. The heat recovery system is described.

  2. Boise Inc. St. Helens Paper Mill Achieves Significant Fuel Savings

    Broader source: Energy.gov [DOE]

    This case study describes how the Boise Inc. paper mill in St. Helens, Oregon, achieved annual savings of approximately 154,000 MMBtu and more than $1 million. This was accomplished after receiving a DOE energy assessment and implementing recommendations to improve the efficiency of its steam system.

  3. Perturbation Theory of Massive Yang-Mills Fields

    DOE R&D Accomplishments [OSTI]

    Veltman, M.

    1968-08-01

    Perturbation theory of massive Yang-Mills fields is investigated with the help of the Bell-Treiman transformation. Diagrams containing one closed loop are shown to be convergent if there are more than four external vector boson lines. The investigation presented does not exclude the possibility that the theory is renormalizable.

  4. Reviewing the success of intentional flooding of the Grand Canyon

    SciTech Connect (OSTI)

    Wirth, B.D.

    1997-04-01

    A description and evaluation of the results of an intentional flooding experiment at the Grand Canyon are described. The purpose of the 7-day release of flood waters from the Glen Canyon Dam was to determine if managed floods have the ability to predictably restore the riverine environment. A summary of environmental conditions leading to the experiment is provided and flood results are listed. Initial results showed significant improvement in the size and number of the river`s beaches, creation of backwater habitat for endangered species, and no adverse impact to the trout fishery, Indian cultural sites, and other resources.

  5. Statement by Energy Secretary Steven Chu on Today's Grand Opening of the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nordex Manufacturing Facility in Jonesboro, Arkansas | Department of Energy Today's Grand Opening of the Nordex Manufacturing Facility in Jonesboro, Arkansas Statement by Energy Secretary Steven Chu on Today's Grand Opening of the Nordex Manufacturing Facility in Jonesboro, Arkansas October 29, 2010 - 12:00am Addthis WASHINGTON, D.C. - U.S. Energy Secretary Steven Chu issued the following statement on today's grand opening of the Nordex wind turbine manufacturing facility in Jonesboro. The

  6. Remediation of former uranium mining and milling activities in Central Asia

    SciTech Connect (OSTI)

    Waggitt, Peter

    2007-07-01

    Available in abstract form only. Full text of publication follows: Several of the Central Asian countries of the former Soviet Union were involved in the uranium mining and milling industry from about 1945 for varying periods until the break up of the Soviet Union in 1991 and beyond. Some facilities are still producing in Uzbekistan and Kazakhstan. However, before the break up, many facilities had been abandoned and in only a few cases had any remediation been undertaken. Since 1991 the newly independent states of the region have been seeking assistance for the remediation of the multitude of tailings piles, waste rock stockpiles and abandoned, and often semi dismantled, production facilities that may be found throughout the region. Many of these sites are close to settlements that were established as service towns for the mines. Most towns still have populations, although the mining industry has departed. In some instances there are cases of pollution and contamination and in many locations there is a significant level of public concern. The IAEA has been undertaking a number of Technical Cooperation (TC) projects throughout the region for some time to strengthen the institutions in the relevant states and assist them to establish monitoring and surveillance programs as an integral part of the long term remediation process. The IAEA is liaising with other agencies and donors who are also working on these problems to optimise the remediation effort. The paper describes the objectives and operation of the main TC regional program, liaison efforts with other agencies, the achievements so far and the long term issues for remediation of these legacies of the 'cold war' era. (authors)

  7. Radio-Ecological Conditions of Groundwater in the Area of Uranium Mining and Milling Facility - 13525

    SciTech Connect (OSTI)

    Titov, A.V.; Semenova, M.P.; Seregin, V.A.; Isaev, D.V.; Metlyaev, E.G. [FSBU SRC A.I.Burnasyan Federal Medical Biophysical Center of FMBA of Russia, Zhivopisnaya Street, 46, Moscow (Russian Federation)] [FSBU SRC A.I.Burnasyan Federal Medical Biophysical Center of FMBA of Russia, Zhivopisnaya Street, 46, Moscow (Russian Federation); Glagolev, A.V.; Klimova, T.I.; Sevtinova, E.B. [FSESP 'Hydrospecgeologiya' (Russian Federation)] [FSESP 'Hydrospecgeologiya' (Russian Federation); Zolotukhina, S.B.; Zhuravleva, L.A. [FSHE 'Centre of Hygiene and Epidemiology no. 107' under FMBA of Russia (Russian Federation)] [FSHE 'Centre of Hygiene and Epidemiology no. 107' under FMBA of Russia (Russian Federation)

    2013-07-01

    Manmade chemical and radioactive contamination of groundwater is one of damaging effects of the uranium mining and milling facilities. Groundwater contamination is of special importance for the area of Priargun Production Mining and Chemical Association, JSC 'PPMCA', because groundwater is the only source of drinking water. The paper describes natural conditions of the site, provides information on changes of near-surface area since the beginning of the company, illustrates the main trends of contaminators migration and assesses manmade impact on the quality and mode of near-surface and ground waters. The paper also provides the results of chemical and radioactive measurements in groundwater at various distances from the sources of manmade contamination to the drinking water supply areas. We show that development of deposits, mine water discharge, leakages from tailing dams and cinder storage facility changed general hydro-chemical balance of the area, contributed to new (overlaid) aureoles and flows of scattering paragenetic uranium elements, which are much smaller in comparison with natural ones. However, increasing flow of groundwater stream at the mouth of Sukhoi Urulyungui due to technological water infiltration, mixing of natural water with filtration streams from industrial reservoirs and sites, containing elevated (relative to natural background) levels of sulfate-, hydro-carbonate and carbonate- ions, led to the development and moving of the uranium contamination aureole from the undeveloped field 'Polevoye' to the water inlet area. The aureole front crossed the southern border of water inlet of drinking purpose. The qualitative composition of groundwater, especially in the southern part of water inlet, steadily changes for the worse. The current Russian intervention levels of gross alpha activity and of some natural radionuclides including {sup 222}Rn are in excess in drinking water; regulations for fluorine and manganese concentrations are also in excess

  8. 2011 Annual Planning Summary for Office of Legacy Management (LM), Grand Junction (See LM APS)

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Legacy Management (LM), Grand Junction (See LM APS).

  9. Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review April 14, 2014 - 4:27pm Addthis Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review You're Invited: 2014 SunShot Grand Challenge Summit and Peer Review Hear from solar's brightest visionaries about what's on the horizon for the U.S. solar energy industry WASHINGTON, D.C. -- Members of the media are invited to attend

  10. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  11. Feasibility for Reintroducing Sockeye and Coho Salmon in the Grande Ronde Basin, 1998 Final Report.

    SciTech Connect (OSTI)

    Cramer, Steven P.; Witty, Kenneth L.

    1998-07-01

    A report concerning the feasibility of reintroducing Sockeye Salmon into Wallowa Lake and Coho Salmon into the Grande Ronde River Basin.

  12. EV Everywhere EV Everywhere Grand Challenge- Electric Drive (Power Electronics and Electric Machines) Workshop Agenda

    Broader source: Energy.gov [DOE]

    Agenda for the EV Everywhere Grand Challenge - Electric Drive Workshop on July 24, 2012 at the Doubletree O'Hare, Chicago, IL

  13. EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Attendence List

    Broader source: Energy.gov [DOE]

    Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA

  14. Geomorphology of plutonium in the Northern Rio Grande

    SciTech Connect (OSTI)

    Graf, W.L.

    1993-03-01

    Nearly all of the plutonium in the natural environment of the Northern Rio Grande is associated with soils and sediment, and river processes account for most of the mobility of these materials. A composite regional budget for plutonium based on multi-decadal averages for sediment and plutonium movement shows that 90 percent of the plutonium moving into the system is from atmospheric fallout. The remaining 10 percent is from releases at Los Alamos. Annual variation in plutonium flux and storage exceeds 100 percent. The contribution to the plutonium budget from Los Alamos is associated with relatively coarse sediment which often behaves as bedload in the Rio Grande. Infusion of these materials into the main stream were largest in 1951, 1952, 1957, and 1968. Because of the schedule of delivery of plutonium to Los Alamos for experimentation and weapons manufacturing, the latter two years are probably the most important. Although the Los Alamos contribution to the entire plutonium budget was relatively small, in these four critical years it constituted 71--86 percent of the plutonium in bedload immediately downstream from Otowi.

  15. New Claus tail-gas process proved in German operation

    SciTech Connect (OSTI)

    Kettner, R.; Liermann, N.

    1988-01-11

    A process for removing sulfur components from Claus-plant tail gases increases sulfur-recovery rates to 99.5%. It has been in use for more than 4 years. In December 1983, a tail-gas cleaning unit was started up for the sulfur-recovery plants of the Nordeutsche Erdgas Aufbereitungsgesellschaft (NEAG) natural-gas treating complex at Voigten, West Germany. NEAG, a joint venture of Exxon, Shell, and Mobil Oil, desulfurizes 7.7 million normal cu m/day (approximately 271.2 million cfd) of sour gas in three plants. Up to 1,050 tons/day of elemental sulfur are produced (Fig. 1). Mobil Oil AG developed the process which has been dubbed the Mobil direct-oxidation process (Modop).

  16. Understanding of fundamentals. Key to process modification for tailings reduction

    SciTech Connect (OSTI)

    Kotlyar, L.S.; Sparks, B.D.; Woods, J.R. ); Schutte, R. )

    1993-12-01

    The tailings produced during bitumen separation from oil sands have a high water holding capacity attributed to ultrafine ([le] 0.2 [mu]m), aluminosilicate clay fractions. These components readily form gels within which both fine and coarse particles may be embedded. This complex mixture (or [open quotes]fine tails[close quotes]) shows poor dewatering and consolidation characteristics. In this work it has been demonstrated that for gel formation to occur an appropriate combination of ultrafines (amount and particle size) and water chemistry is needed. The natural salt concentration in water recycled from the tailings or pore (connate) water is sufficient to cause the ultrafines to form gels in a matter of days. Gel formers are an integral part of oil sands ores which are unavoidably released during processing. However, one way to prevent gel formation is to change the water chemistry in the extraction process where the bitumen is released. This can be achieved by the addition of sodium silicate instead of sodium hydroxide as process aid in the initial oil sands conditioning step. 8 refs., 3 figs., 1 tab.

  17. Study of Cu and Pb partitioning in mine tailings using the Tessier sequential extraction scheme

    SciTech Connect (OSTI)

    Andrei, Mariana Lucia; Senila, Marin; Hoaghia, Maria Alexandra; Levei, Erika-Andrea; Borodi, Gheorghe

    2015-12-23

    The Cu and Pb partitioning in nonferrous mine tailings was investigated using the Tessier sequential extraction scheme. The contents of Cu and Pb found in the five operationally defined fractions were determined by inductively coupled plasma optical emission spectrometry. The results showed different partitioning patterns for Cu and Pb in the studied tailings. The total Cu and Pb contents were higher in tailings from Brazesti than in those from Saliste, while the Cu contents in the first two fractions considered as mobile were comparable and the content of mobile Pb was the highest in Brazesti tailings. In the tailings from Saliste about 30% of Cu and 3% of Pb were found in exchangeable fraction, while in those from Brazesti no metals were found in the exchangeable fraction, but the percent of Cu and Pb found in the bound to carbonate fraction were high (20% and 26%, respectively). The highest Pb content was found in the residual fraction in Saliste tailings and in bound to Fe and Mn oxides fraction in Brazesti tailings, while the highest Cu content was found in the fraction bound to organic matter in Saliste tailings and in the residual fraction in Brazesti tailings. In case of tailings of Brazesti medium environmental risk was found both for Pb and Cu, while in case of Saliste tailings low risk for Pb and high risk for Cu were found.

  18. Wind Resource Assessment Report: Mille Lacs Indian Reservation, Minnesota

    SciTech Connect (OSTI)

    Jimenez, A. C.

    2013-12-01

    The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy on potentially contaminated land and mine sites. EPA collaborated with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) and the Mille Lacs Band of Chippewa Indians to evaluate the wind resource and examine the feasibility of a wind project at a contaminated site located on the Mille Lacs Indian Reservation in Minnesota. The wind monitoring effort involved the installation of a 60-m met tower and the collection of 18 months of wind data at multiple heights above the ground. This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and an assessment of the economic feasibility of a potential wind project sited this site.

  19. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 2, Appendices: Final environmental impact statement

    SciTech Connect (OSTI)

    1986-12-01

    This volume contains Appendix F--hydrology report, and Appendix G--flood plain and wetland assessment. Contents of the hydrology report include: surface water; ground water; potentially affected hydrogeologic environment-processing site; potentially affected hydrogeologic environment-Cheney reservoir site; potentially affected hydrogeologic environment-Two Road site; and conclusions-ground water.

  20. From: Mills, Pamela To: Congestion Study Comments Cc: Strack, Jan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mills, Pamela To: Congestion Study Comments Cc: Strack, Jan Subject: National Electric Transmission Congestion Study - Draft for Public Comment Date: Friday, October 17, 2014 6:18:37 PM Attachments: SDGE Comments on the National Electric Transmission Congestion Study - Draft for Public Comment.docx Please find attached SDG&E's comments on the National Electric Transmission Congestion Study - Draft for Public Comment. Any questions or comments regarding the attached document should be

  1. Multiscale MonteCarlo equilibration: Pure Yang-Mills theory

    SciTech Connect (OSTI)

    Endres, Michael G.; Brower, Richard C.; Orginos, Kostas; Detmold, William; Pochinsky, Andrew V.

    2015-12-29

    In this study, we present a multiscale thermalization algorithm for lattice gauge theory, which enables efficient parallel generation of uncorrelated gauge field configurations. The algorithm combines standard Monte Carlo techniques with ideas drawn from real space renormalization group and multigrid methods. We demonstrate the viability of the algorithm for pure Yang-Mills gauge theory for both heat bath and hybrid Monte Carlo evolution, and show that it ameliorates the problem of topological freezing up to controllable lattice spacing artifacts.

  2. Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

    SciTech Connect (OSTI)

    McGowan, Vance R.; Morton, Winston H.

    2008-12-30

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by

  3. Salto Grande. [1890-MW project on Vruguay River

    SciTech Connect (OSTI)

    de Hoyos, R.J.

    1980-09-01

    A joint hydroelectric project, the Salto Grande Dam on the Uruguay River, serves six million people in Argentina and Uruguay. The construction day was continuous from April 1974 until the first turbine began on schedule in July 1979. Although planning began in 1890 by individual visionaries who saw the river's potential, serious efforts did not get underway for another 50 years. The project became a technical training school and has built up a recognized management team in the process. Financing became available only after the 1973 oil embargo. The benefits of regional cooperation to develop a common resource enables the two countries to provide water resources, electric power, navigable streams for commerce and recreation, a common highway, and an interconnecting railroad. The cooperative infrastructure established to meet the needs of project personnel has improved living conditions for the area. (DCK)

  4. A Leptophobic Z' And Dark Matter From Grand Unification

    SciTech Connect (OSTI)

    Buckley, Matthew R.; Hooper, Dan; Rosner, Jonathan L.

    2011-09-01

    We explore the phenomenology of Grand Unified Models based on the E_6 group, focusing on the Z' with suppressed couplings to leptons that can appear in such models. We find that this Z' can accommodate the W+dijets anomaly reported by the CDF collaboration. Furthermore, a viable dark matter candidate in the form of a right-handed sneutrino is also present within the fundamental 27-dimensional representation of E_6. Through its sizable couplings to the Z', the dark matter is predicted to possess an elastic scattering cross section with neutrons which can generate the signals reported by the CoGeNT and DAMA/LIBRA collaborations. To avoid being overproduced in the early universe, the dark matter must annihilate to leptons through the exchange of charged or neutral fermions which appear in the 27 of E_6, providing an excellent fit to the gamma ray spectrum observed from the Galactic Center by the Fermi Gamma Ray Space Telescope.

  5. Precision welding cuts downtime at Grand Coulee Dam

    SciTech Connect (OSTI)

    Light, S.; White, E.

    1997-03-01

    The three large 700-MW generators at Grand Coulee Dam--originally built and installed by Canadian General Electric in the late 1970s--are being upgraded using precision welding techniques and leading edge installation technology. These generators suffered from numerous water leaks at and around the bar water connections, resulting in a significant number of forced repair outages that were increasing in frequency. The US Bureau of Reclamation, in conjunction with the Bonneville Power Administration, decided to overhaul these machines. The design from Siemens Power Corp. provided state-of-the-art materials and included a rating increase from 700 to 805 MW, which would make these three machines the highest output single-unit hydrogenerators in the world. The upgrade was to be accomplished with only the replacement of the stator components; there would be no changes to the rotating element. The cost for all three machines is approximately $27.5 million. This project is described in this paper.

  6. Scientific Grand Challenges Workshop Series | U.S. DOE Office of Science

    Office of Science (SC) Website

    (SC) Scientific Grand Challenges Workshop Series Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) Community Resources Featured Content ASCR Discovery ASCR Program Documents ASCR Workshops and Conferences Workshops & Conferences Archive DOE Simulations Summit Scientific Grand Challenges Workshop Series SciDAC Conferences HPC Operations Review

  7. December 2015 Groundwater and Surface Waater Sampling at the Grand Junction, Colorado, Site

    Office of Legacy Management (LM)

    and Surface Water Sampling at the Grand Junction, Colorado, Site March 2016 LMS/GJO/S01215 This page intentionally left blank U.S. Department of Energy DVP-December 2015, Grand Junction, Colorado March 2016 RIN 15117528 Page i Contents Sampling Event Summary ...............................................................................................................1 Data Assessment Summary

  8. Deconfinement in Yang-Mills Theory through Toroidal Compactification

    SciTech Connect (OSTI)

    Simic, Dusan; Unsal, Mithat; /Stanford U., Phys. Dept. /SLAC

    2011-08-12

    We introduce field theory techniques through which the deconfinement transition of four-dimensional Yang-Mills theory can be moved to a semi-classical domain where it becomes calculable using two-dimensional field theory. We achieve this through a double-trace deformation of toroidally compactified Yang-Mills theory on R{sup 2} x S{sub L}{sup 1} x S{sub {beta}}{sup 1}. At large N, fixed-L, and arbitrary {beta}, the thermodynamics of the deformed theory is equivalent to that of ordinary Yang-Mills theory at leading order in the large N expansion. At fixed-N, small L and a range of {beta}, the deformed theory maps to a two-dimensional theory with electric and magnetic (order and disorder) perturbations, analogs of which appear in planar spin-systems and statistical physics. We show that in this regime the deconfinement transition is driven by the competition between electric and magnetic perturbations in this two-dimensional theory. This appears to support the scenario proposed by Liao and Shuryak regarding the magnetic component of the quark-gluon plasma at RHIC.

  9. Reclamation of acidic copper mine tailings using municipal biosolids

    SciTech Connect (OSTI)

    Rogers, M.T.; Thompson, T.L.; Bengson, S.A.

    1998-12-31

    Reclamation of copper mine tailings in a cost effective, successful, and sustainable manner is an ongoing area of evaluation in the arid southwest. A study was initiated in September, 1996 near Hayden, Arizona to evaluate the use of municipal biosolids for reclaiming acidic copper mine tailings (pH of 2.5 to 4.0). The main objectives of the study were to (1) define an appropriate level of biosolids application for optimum plant growth, and (2) evaluate the effects of green waste and lime amendments. The experiment was a randomized complete block design with four biosolid rates of 20, 70, 100 and 135 dry tons/acre, three amendment treatments (none, green waste, and green waste plus lime); with three replications. Non-replicated controls (no treatment, green waste only and lime only) were included for comparison. Shortly after biosolids incorporation to a depth of 10--12 inches, composite soil samples (0--12 inches) of each plot were taken. Biosolids incorporation increased the pH of the tailings (>5.75) and additional increases in pH were noted with lime application. In January 1997, the plots were seeded and sprinkler irrigation was commenced. A total of 4.47 inches of rainfall and 3.8 inches of irrigation were applied until harvest in May 1997. Data from the first growing season indicates optimum growth (>66 lbs/acre) at biosolids rates of 70--100 dry tons/acre. There was a significant positive effect on growth of green waste and lime amendments. Surface NO{sub 3}-N concentrations in biosolids amended plots were greatly reduced (from 23 to 6 mg/kg) by addition of green waste. There was no evidence for NO{sub 3}N leaching below 12 inches.

  10. Low energy milling method, low crystallinity alloy, and negative electrode composition

    DOE Patents [OSTI]

    Le, Dihn B; Obrovac, Mark N; Kube, Robert Y; Landucci, James R

    2012-10-16

    A method of making nanostructured alloy particles includes milling a millbase in a pebble mill containing milling media. The millbase comprises: (i) silicon, and (ii) at least one of carbon or a transition metal, and wherein the nanostructured alloy particles are substantially free of crystalline domains greater than 50 nanometers in size. A method of making a negative electrode composition for a lithium ion battery including the nanostructured alloy particles is also disclosed.

  11. Inter-Tribal Council of Michigan, Inc. - Bay Mills Indian Community Energy Reduction Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    --Tribal Council of Michigan, Inc. Environmental Services Division Bay Mills Indian Community Energy Reduc<on Feasibility Study Chris K ushman Thank You *DOE Tribal Energy Program *Tribal Energy Program Review presenters *Bay Mills Indian Community Bay Mills Indian Community * Upper Peninsula of Michigan - Cold temperatures - Prolonged exposure to strong north winds off Lake Superior - Short winter daylight * Fishing and fish consuming community * Electricity largely supplied by coal fired

  12. Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively Contaminated Properties Site (Monticello Vicinity Properties) and the Monticello Mill Tailings Site

    Broader source: Energy.gov [DOE]

    Five-year reviews for the two Monticello, Utah, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites were completed in June 2012 by U.S. Department of Energy (DOE) Office of Legacy Management (LM), U.S. Environmental Protection Agency, and Utah Department of Environmental Quality.

  13. Type B Accident Investigation Board Report on the November 1, 1999, Construction Injury at the Monticello Mill Tailings Remedial Action Site, Monticello, Utah

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type B accident investigation board appointed by R. E. Glass, Manager, Albuquerque Operations Office.

  14. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado. Attachment 2, Geology report: Final report

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    Detailed investigations of geologic, geomorphic, and seismic conditions at the Landfill disposal site were conducted. The purpose of these studies was basic site characterization and identification of potential geologic hazards that could affect long-term site stability. Subsequent engineering studies, such as analyses of hydrologic and liquefaction hazards, used the data developed in these studies. The geomorphic analysis was employed in the design of effective erosion protection. Studies of the regional and local seismotectonic setting, which included a detailed search for possible capable faults within a 65-kilometer (km) (40-mile) radius of the site, provided the basis for seismic design parameters. The scope of work performed included the following: Compilation and analysis of previous published and unpublished geologic literature and maps. Review of historical and instrumental earthquake data. Review of site-specific subsurface geologic data, including lithologic and geophysical logs of exploratory boreholes advanced in the site area. Photogeologic interpretations of existing conventional aerial photographs. Ground reconnaissance and mapping of the site region.

  15. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Text, Appendices A--C. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A,B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.

  16. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah

    SciTech Connect (OSTI)

    1993-02-01

    This document is a revision of the original Mexiacan Hat Remedial Action Plan (RAP) and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. This RAP has been developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3. 0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 presents the water resources protection strategy. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the on- site workers. Section 7.0 lists the responsibilities of the project participants. Section 8.0 describes the features of the long-term surveillance and maintenance plan.

  17. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona. Text, Appendices A, B, and C: Final report

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project.

  18. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C: Final report

    SciTech Connect (OSTI)

    Matthews, M.L.; Alkema, K.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.

  19. Remedial Action Plan for the codisposal and stabilization of the Monument Valley and Mexican Hat uranium mill tailings at Mexican Hat, Utah: Appendices C--E. Final report

    SciTech Connect (OSTI)

    1993-02-01

    This document provides appendices C, D, and E this Remedial Action Plan (RAP) which is a revision of the original Mexican Hat Remedial Action Plan and RAP Modification submitted in July 1988 and January 1989, respectively, along with updated design documents. Appendix C provide the Radiological Support Plan, Appendix D provides the Site Characterization, and Appendix E provides the Water Resources Protection Strategy.

  20. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lowman, Idaho. Attachment 4, Water resources protection strategy: Final report

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The DOE proposes to achieve compliance with the proposed EPA groundwater protection standards (Subparts A and B of 40 CFR 192) by meeting the EPA maximum concentration limits (MCLs) or background concentrations for designated hazardous constituents in groundwater in the uppermost aquifer (alluvium/weathered granodiorite) at the point of compliance (POC) at the Lowman disposal site near Lowman, Idaho. The proposed remedial action in conjunction with existing hydrogeological conditions at the Lowman site will ensure sufficient protection of human health and the environment. The DOE has concluded that the EPA groundwater protection standards will be met at the POC because, with the exception of antimony, none of the hazardous constituents that exceed laboratory method detection limits within the radioactive sand pore fluids were above the proposed concentration limits. The DOE has demonstrated that antimony will meet the proposed concentration limits at the POC through attenuation in subsoils beneath the disposal cell and by dilution in groundwater underflow. The Lowman processing site is in compliance with Subpart B of 40 CFR 192 because statistical analyses of groundwater samples indicate no groundwater contamination.