Powered by Deep Web Technologies
Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

MHK Projects/Fortyeight Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Fortyeight Mile Point Project Fortyeight Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0447,"lon":-90.6659,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

2

MHK Projects/Twelve Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Twelve Mile Point Project Twelve Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9177,"lon":-89.9307,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

3

MHK Projects/Thirty Five Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Thirty Five Mile Point Project Thirty Five Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0146,"lon":-90.4774,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

4

MHK Projects/Eighty One Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Eighty One Mile Point Project Eighty One Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.16,"lon":-91.0056,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

5

New York Nuclear Profile - Nine Mile Point Nuclear Station  

U.S. Energy Information Administration (EIA) Indexed Site

Nine Mile Point Nuclear Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

6

EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Midnight Point and Mahogany Geothermal Exploration 5: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon SUMMARY This EA evaluates Ormat Nevada, Inc.'s (Ormat's) proposed geothermal project consists of drilling up to 16 wells for geothermal exploration approximately 70 miles southeast of Bend, Oregon and 50 miles northwest of Burns, Oregon just south of U.S. Highway 20. The proposed project includes three distinct drilling areas. Up to three wells would be drilled on lands managed by the Bureau of Land Management (BLM) Prineville District (Mahogany), up to ten wells would be drilled on lands managed by the BLM Burns District (Midnight Point), and up to three wells would be drilled on

7

EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1925: Midnight Point and Mahogany Geothermal Exploration EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon SUMMARY This EA evaluates Ormat Nevada, Inc.'s (Ormat's) proposed geothermal project consists of drilling up to 16 wells for geothermal exploration approximately 70 miles southeast of Bend, Oregon and 50 miles northwest of Burns, Oregon just south of U.S. Highway 20. The proposed project includes three distinct drilling areas. Up to three wells would be drilled on lands managed by the Bureau of Land Management (BLM) Prineville District (Mahogany), up to ten wells would be drilled on lands managed by the BLM Burns District (Midnight Point), and up to three wells would be drilled on

8

BP Cherry Point Congeneration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REVISED 404 (B) (1) REVISED 404 (B) (1) ALTERNATIVES ANALYSIS BP Cherry Point Cogeneration Project Prepared for: BP West Coast Products, LLC Revised June 29, 2004 1501 Fourth Avenue, Suite 1400 Seattle, WA 98101-1616 (206) 438-2700 33749546.05070 i TABLE OF CONTENTS Page 1.0 I NT RODUCTI ON ................................................................................................................... 1 2.0 P URPOSE AND NEE D .......................................................................................................... 1 2.1 RELIABILITY .................................................................................................... 1 2.2 COST-EFFECTIVENESS ................................................................................... 3 2.3 SIZE OF FACILITY............................................................................................

9

BP Cherry Point Cogeneration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers August 2004 EFSEC Washington State Energy Facility Site Evaluation Council July 12, 2004 Dear Reader: Enclosed for your reference is the abbreviated Final Environmental Impact Statement (FEIS) for the proposed BP Cherry Point Cogeneration Project. This document is designed to correct information and further explain what was provided in the Draft Environmental Impact Statement (DEIS). The proponent, BP West Coast Products, LLC, has requested to build a 720-megawatt gas-fired combined cycle cogeneration facility in Whatcom County, Washington, and interconnect this facility into the regional

10

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

11

Transformer failure and common-mode loss of instrument power at Nine Mile Point Unit 2 on August 13, 1991  

Science Conference Proceedings (OSTI)

On August 13, 1991, at Nine Mile Point Unit 2 nuclear power plant, located near Scriba, New York, on Lake Ontario, the main transformer experienced an internal failure that resulted in degraded voltage which caused the simultaneous loss of five uninterruptible power supplies, which in turn caused the loss of several nonsafety systems, including reactor control rod position indication, some reactor power and water indication, control room annunciators, the plant communications system, the plant process computer, and lighting at some locations. The reactor was subsequently brought to a safe shutdown. Following this event, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to the site to determine what happened, to identify the probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents and the team's findings and conclusions. 59 figs., 14 tabs.

Not Available

1991-10-01T23:59:59.000Z

12

Midnight Point Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Midnight Point Geothermal Project Midnight Point Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Midnight Point Geothermal Project Project Location Information Coordinates 43.548333333333°, -119.97611111111° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.548333333333,"lon":-119.97611111111,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

13

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 EFSEC Washington State Energy Facility Site Evaluation Council September 5, 2003 Dear Reader: Enclosed for your review is the Draft Environmental Impact Statement (DEIS) for the proposed BP Cherry Point Cogeneration Project. The proponent, BP West Coast Products, LLC, has requested to build a 720-Megawatt Gas-Fired Combined Cycle Cogeneration Facility in Whatcom County, Washington, and interconnect this facility into the regional power transmission grid. To integrate the new power generation into the transmission grid, Bonneville Power Administration (Bonneville) may need to re-build 4.7 miles of an existing 230-kV

14

Population estimates for the areas within a 50-mile radius of four reference points on the Hanford Site  

SciTech Connect

This report presents population distributions within a 50-mile radius of four locations on the Hanford Site. The results are based on the US Bureau of Census 1980 population counts for Washington and Oregon. These results are documented in Tables 2 to 13 and 15 to 18 of this report.

Sommer, D.J.; Rau, R.G.; Robinson, D.C.

1981-11-01T23:59:59.000Z

15

EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon...

16

Projective Hilbert space structures at exceptional points  

E-Print Network (OSTI)

A non-Hermitian complex symmetric 2x2 matrix toy model is used to study projective Hilbert space structures in the vicinity of exceptional points (EPs). The bi-orthogonal eigenvectors of a diagonalizable matrix are Puiseux-expanded in terms of the root vectors at the EP. It is shown that the apparent contradiction between the two incompatible normalization conditions with finite and singular behavior in the EP-limit can be resolved by projectively extending the original Hilbert space. The complementary normalization conditions correspond then to two different affine charts of this enlarged projective Hilbert space. Geometric phase and phase jump behavior are analyzed and the usefulness of the phase rigidity as measure for the distance to EP configurations is demonstrated. Finally, EP-related aspects of PT-symmetrically extended Quantum Mechanics are discussed.

Guenther, Uwe; Samsonov, Boris F

2007-01-01T23:59:59.000Z

17

MHK Projects/Jackson Point Project | Open Energy Information  

Open Energy Info (EERE)

Jackson Point Project Jackson Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.264,"lon":-91.5854,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

18

MHK Projects/Hope Field Point Project | Open Energy Information  

Open Energy Info (EERE)

Hope Field Point Project Hope Field Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.1552,"lon":-90.0716,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

19

MHK Projects/College Point Project | Open Energy Information  

Open Energy Info (EERE)

Point Project Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30,"lon":-90.8357,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

20

MHK Projects/Duncan Point Project | Open Energy Information  

Open Energy Info (EERE)

Duncan Point Project Duncan Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.3743,"lon":-91.2403,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

MHK Projects/Ashley Point Project | Open Energy Information  

Open Energy Info (EERE)

Ashley Point Project Ashley Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.8354,"lon":-90.432,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

22

MHK Projects/Williams Point Project | Open Energy Information  

Open Energy Info (EERE)

Point Project Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.4755,"lon":-89.5308,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

23

MHK Projects/Plum Point Project | Open Energy Information  

Open Energy Info (EERE)

Point Project Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.735,"lon":-89.9154,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

24

MHK Projects/Anconia Point Project | Open Energy Information  

Open Energy Info (EERE)

Anconia Point Project Anconia Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.2952,"lon":-91.168,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

25

MHK Projects/Brilliant Point Project | Open Energy Information  

Open Energy Info (EERE)

Point Project Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0835,"lon":-90.912,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

26

MHK Projects/Manchac Point Project | Open Energy Information  

Open Energy Info (EERE)

Manchac Point Project Manchac Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.3421,"lon":-91.1832,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

27

Methodology for Calculating Cost-per-Mile for Current and Future Vehicle Powertrain Technologies, with Projections to 2024: Preprint  

DOE Green Energy (OSTI)

Currently, several cost-per-mile calculators exist that can provide estimates of acquisition and operating costs for consumers and fleets. However, these calculators are limited in their ability to determine the difference in cost per mile for consumer versus fleet ownership, to calculate the costs beyond one ownership period, to show the sensitivity of the cost per mile to the annual vehicle miles traveled (VMT), and to estimate future increases in operating and ownership costs. Oftentimes, these tools apply a constant percentage increase over the time period of vehicle operation, or in some cases, no increase in direct costs at all over time. A more accurate cost-per-mile calculator has been developed that allows the user to analyze these costs for both consumers and fleets. The calculator was developed to allow simultaneous comparisons of conventional light-duty internal combustion engine (ICE) vehicles, mild and full hybrid electric vehicles (HEVs), and fuel cell vehicles (FCVs). This paper is a summary of the development by the authors of a more accurate cost-per-mile calculator that allows the user to analyze vehicle acquisition and operating costs for both consumer and fleets. Cost-per-mile results are reported for consumer-operated vehicles travelling 15,000 miles per year and for fleets travelling 25,000 miles per year.

Ruth, M.; Timbario, T. A.; Timbario, T. J.; Laffen, M.

2011-01-01T23:59:59.000Z

28

BP Cherry Point Cogeneration Project, Draft Environmental Impact Statement  

SciTech Connect

BP West Coast Products, LLC (BP or the Applicant) proposes to construct and operate a nominal 720-megawatt (MW), natural-gas-fired, combined-cycle cogeneration facility next to the existing BP Cherry Point Refinery in Whatcom County, Washington. The Applicant also owns and operates the refinery, but the cogeneration facility and the refinery would be operated as separate business units. The cogeneration facility and its ancillary infrastructure would provide steam and 85 MW of electricity to meet the operating needs of the refinery and 635 MW of electrical power for local and regional consumption. The proposed cogeneration facility would be located between Ferndale and Blaine in northwestern Whatcom County, Washington. The Canadian border is approximately 8 miles north of the proposed project site. The Washington State Energy Facility Site Evaluation Council (EFSEC) has jurisdiction over the evaluation of major energy facilities including the proposed project. As such, EFSEC will recommend approval or denial of the proposed cogeneration facility to the governor of Washington after an environmental review. On June 3, 2002, the Applicant filed an Application for Site Certification (ASC No. 2002-01) with EFSEC in accordance with Washington Administrative Code (WAC) 463-42. On April 22, 2003, the Applicant submitted an amended ASC that included, among other things, a change from air to water cooling. With the submission of the ASC and in accordance with the State Environmental Policy Act (SEPA) (WAC 463-47), EFSEC is evaluating the siting of the proposed project and conducting an environmental review with this Environmental Impact Statement (EIS). Because the proposed project requires federal agency approvals and permits, this EIS is intended to meet the requirements under both SEPA and the National Environmental Policy Act (NEPA). The Bonneville Power Administration (Bonneville) and U.S. Army Corps of Engineers (Corps) also will use this EIS as part of their respective decision-making processes associated with the Applicant's request to interconnect to Bonneville's transmission system and proposed location of the project within wetland areas. Therefore, this Draft EIS serves as the environmental review document for SEPA and for NEPA as required by Bonneville for the interconnection and the Corps for its 404 individual permit. The EIS addresses direct, indirect, and cumulative impacts of the proposed project, and potential mitigation measures proposed by the Applicant, as well as measures recommended by EFSEC. The information and resulting analysis presented in this Draft EIS are based primarily on information provided by the Applicant in the ASC No. 2002-01 (BP 2002). Where additional information was used to evaluate the potential impacts associated with the proposed action, that information has been referenced. EFSEC's environmental consultant, Shapiro and Associates, Inc., did not perform additional studies during the preparation of this Draft EIS.

N /A

2003-09-19T23:59:59.000Z

29

Set point calculations for RAPID project  

Science Conference Proceedings (OSTI)

This change modifies accuracies of the water skid temperature indicators and controllers TIC-410. TI-412, TI-413, TIC-413, TIC-414, TIC-415. Acknowledges ability to calibrate PQIT-367 and modifies the accuracy of that instrument loop. Adjusts the allowable dilution dater temperature from 110-130F to 102-130F based on PCP Rev.2 and adjusts alarm and other points to reflect that change. Removes revision numbers for all references. Numerous additional changes (fixing typos, more detailed explanations etc.) throughout.

HICKMAN, G.L.

1999-11-19T23:59:59.000Z

30

Evaluation of nuclear facility decommissioning projects: Summary status report: Three Mile Island Unit 2. Radioactive waste and laundry shipments  

SciTech Connect

This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 through April 19, 1987. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

Doerge, D. H.; Haffner, D. R.

1988-06-01T23:59:59.000Z

31

MHK Projects/Point Menoir Project | Open Energy Information  

Open Energy Info (EERE)

Menoir Project Menoir Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.6436,"lon":-91.3029,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

32

MHK Projects/Point Pleasant Project | Open Energy Information  

Open Energy Info (EERE)

Pleasant Project Pleasant Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2571,"lon":-91.1172,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

33

CenterPoint Energy Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead CenterPoint Energy Country United States Headquarters Location Houston, Texas Recovery Act Funding $200,000,000.00 Total Project Value $639,187,435.00 Coverage Area Coverage Map: CenterPoint Energy Smart Grid Project Coordinates 29.7632836°, -95.3632715° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

34

Hot Springs Point Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Hot Springs Point Geothermal Project Hot Springs Point Geothermal Project Project Location Information Coordinates 39.493055555556°, -117.06666666667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.493055555556,"lon":-117.06666666667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

35

Compliance Monitoring of Underwater Blasting for Rock Removal at Warrior Point, Columbia River Channel Improvement Project, 2009/2010  

Science Conference Proceedings (OSTI)

The U.S. Army Corps of Engineers, Portland District (USACE) conducted the 20-year Columbia River Channel Improvement Project (CRCIP) to deepen the navigation channel between Portland, Oregon, and the Pacific Ocean to allow transit of fully loaded Panamax ships (100 ft wide, 600 to 700 ft long, and draft 45 to 50 ft). In the vicinity of Warrior Point, between river miles (RM) 87 and 88 near St. Helens, Oregon, the USACE conducted underwater blasting and dredging to remove 300,000 yd3 of a basalt rock formation to reach a depth of 44 ft in the Columbia River navigation channel. The purpose of this report is to document methods and results of the compliance monitoring study for the blasting project at Warrior Point in the Columbia River.

Carlson, Thomas J.; Johnson, Gary E.; Woodley, Christa M.; Skalski, J. R.; Seaburg, Adam

2011-05-10T23:59:59.000Z

36

"1. Nine Mile Point","Gas","Entergy Louisiana Inc",1756 "2. Willow Glen","Gas","Entergy Gulf States Louisiana LLC",1752  

U.S. Energy Information Administration (EIA) Indexed Site

Louisiana" Louisiana" "1. Nine Mile Point","Gas","Entergy Louisiana Inc",1756 "2. Willow Glen","Gas","Entergy Gulf States Louisiana LLC",1752 "3. Big Cajun 2","Coal","Louisiana Generating LLC",1743 "4. Brame Energy Center","Coal","Cleco Power LLC",1423 "5. R S Nelson","Coal","Entergy Gulf States Louisiana LLC",1366 "6. Little Gypsy","Gas","Entergy Louisiana Inc",1170 "7. Waterford 3","Nuclear","Entergy Louisiana Inc",1168 "8. Acadia Energy Center","Gas","Acadia Power Partners",1063 "9. River Bend","Nuclear","Entergy Gulf States Louisiana LLC",974

37

Reactor Vessel Internals Inspection and Reactor Pressure Vessel Surveillance Program Summaries for R.E. Ginna and Nine Mile Point Unit 1  

Science Conference Proceedings (OSTI)

This report provides a summary of project activities involving the reactor pressure vessel and internals for the nuclear power plants included in the joint Electric Power Research Institute (EPRI), Department of Energy (DOE), and Constellation Energy Nuclear Group (CENG) Nuclear Plant Life Extension demonstration project.BackgroundThe project focused on continuing operations at two CENG nuclear units that are currently operating in their extended license ...

2013-12-18T23:59:59.000Z

38

MHK Projects/Breeze Point | Open Energy Information  

Open Energy Info (EERE)

Breeze Point Breeze Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.1029,"lon":-91.6161,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

39

MHK Projects/Cypress Point | Open Energy Information  

Open Energy Info (EERE)

Point Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.8714,"lon":-91.8051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

40

MHK Projects/Palmetto Point | Open Energy Information  

Open Energy Info (EERE)

Palmetto Point Palmetto Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.1614,"lon":-91.6013,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

MHK Projects/Orient Point Tidal | Open Energy Information  

Open Energy Info (EERE)

Orient Point Tidal Orient Point Tidal < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0748,"lon":-72.9461,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

42

MHK Projects/Amity Point | Open Energy Information  

Open Energy Info (EERE)

Amity Point Amity Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-27.3978,"lon":153.437,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

43

MHK Projects/South Myette Point | Open Energy Information  

Open Energy Info (EERE)

Myette Point Myette Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.8902,"lon":-91.4391,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

44

MHK Projects/Myette Point | Open Energy Information  

Open Energy Info (EERE)

Myette Point Myette Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9431,"lon":-91.4668,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

45

MHK Projects/Barfield Point | Open Energy Information  

Open Energy Info (EERE)

Barfield Point Barfield Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.8362,"lon":-89.7181,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

46

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendices Appendices DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 SITING AND WETLAND 404(b)1 ALTERNATIVES ANALYSIS BP CHERRY POINT COGENERATION PROJECT [REVISED] Prepared for: BP West Coast Products, LLC Submitted by: Golder Associates Inc. March 2003 013-1421.541 March 2003 i 013-1421.541 TABLE OF CONTENTS Page No. 1. INTRODUCTION 1 2. PURPOSE AND NEED 5 3. ALTERNATIVES 6 3.1 No Action Alternative 6 3.1.1 Self-Reliance 6 3.1.2 Efficiency 6 3.1.3 Reliability 6 3.1.4 Other Impacts of the No Action Alternative 7 3.2 Project Site Location Alternative Selection Process 7 3.2.1 Sufficient Acreage Available

47

Microsoft PowerPoint - 16.1225_Terry Cooke-Davies - Project Complexity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

225Terry Cooke-Davies - Project Complexity as of 16 Mar Microsoft PowerPoint - 16.1225Terry Cooke-Davies - Project Complexity as of 16 Mar Microsoft PowerPoint - 16.1225Terry...

48

Miles Hand Grenade  

DOE Patents (OSTI)

A simulated grenade for MILES-type simulations generates a unique RF signal and a unique audio signal. A detector utilizes the time between receipt of the RF signal and the slower-traveling audio signal to determine the distance between the detector and the simulated grenade.

Harrington, John J. (Albuquerque, NM); Buttz, James H. (Albuquerque, NM); Maish, Alex B. (Corrales, NM); Page, Ray R. (Albuquerque, NM); Metcalf, Herbert E. (Albuquerque, NM)

2005-11-15T23:59:59.000Z

49

Microsoft PowerPoint - 05 Okonski final Project Management Workshop...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Slides O'Konski More Documents & Publications Microsoft PowerPoint - 09 Lehman final 1003 SC PM Workshop Microsoft PowerPoint - ShanasBioSlides121307 Microsoft PowerPoint -...

50

Microsoft PowerPoint - Vicksburg District Federal Power Projects...  

NLE Websites -- All DOE Office Websites (Extended Search)

Vicksburg District Federal Power Projects Vicksburg District Federal Power Projects Blakely Mountain Hydro DeGray Hydro DeGray Hydro Narrows Hydro Blakely Mountain Rewind Unit 1...

51

Microsoft PowerPoint - Vicksburg District Federal Power Projects...  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Power Projects Vicksburg District Federal Power Projects Blakely Mountain Hydro DeGray Hydro DeGray Hydro Narrows Hydro Blakely Mountain Rewind Unit 1 ll Rotor...

52

Three Mile Island  

SciTech Connect

The Three Mile Island accident was the worst accident ever experienced by the nuclear power industry. Although the radiation exposures were extremely low, the potential for greater public exposure did exist. Fortunately, the health and safety of the public were not affected by radiation, nor was anyone killed or injured; however, thousand of lives were disrupted by fear and anxiety and by a limited evacuation. The events and actions contributing to the accident are described.

Buhl, A.R.

1980-09-01T23:59:59.000Z

53

Microsoft PowerPoint - International Projects1.pptm.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

International Program International Program Modeling Activities Boris Faybishenko Lawrence Berkeley National Laboratory Berkeley, CA DOE-EM Project Managers- Kurt Gerdes and Skip Chamberlain Performance Assessment Community of Practice Technical Exchange April 13-14, 2010, Richland, WA Outline * Review of projects formerly supported by DOE-EM * Potential International Projects and Analogue Case Studies for ASCEM - Chernobyl Cooling Pond, Ukraine - Nonclassical transport modeling-project with the Nuclear Safety Institute of RAS, Russia - Uranium Mine and Mills Tailing's Covers * Central Asia--Kazakhstan, Tajikistan, Kyrgyzstan, and Uzbekistan - Cementitious Materials for Long-Term Storage and Disposal * Conclusions and Recommendations Overall Objectives of DOE-EM International Program Modeling Activities

54

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2. Radioactive waste and laundry shipments. Volume 9. Summary status report  

SciTech Connect

This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 to May 5, 1985. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

Doerge, D. H.; Miller, R. L.; Scotti, K. S.

1986-05-01T23:59:59.000Z

55

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

56

EA-1942: Cove Point Liquefaction Project, Lusby, MD | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Cove Point Liquefaction Project, Lusby, MD 2: Cove Point Liquefaction Project, Lusby, MD EA-1942: Cove Point Liquefaction Project, Lusby, MD SUMMARY The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EA, to analyze the potential environmental impacts of a proposal to add natural gas liquefaction and exportation capabilities to an existing Cove Point LNG Terminal located on the Chesapeake Bay in Lusby, Maryland. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 28, 2012 EA-1942: Notice of Intent to Prepare an Environmental Assessment Cove Point Liquefaction Project, Lusby, MD September 24, 2012 EA-1942: Notice of Intent of to Prepare an Environmental Assessment Cove Point Liquefaction Project, Lusby, MD

57

miles-99.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

Vertical Velocity Statistics as Derived from 94-GHz Vertical Velocity Statistics as Derived from 94-GHz Radar Measurements N. L. Miles, D. M. Babb, and J. Verlinde The Pennsylvania State University University Park, Pennsylvania Introduction Profiles of millimeter-wavelength radar Doppler spectra contain information about both the mean vertical velocities and cloud microphysics. In order to obtain this information, it is necessary to remove the effects of turbulence. Stratocumulus clouds often contain various species of ice and liquid, including graupel, crystals, columns, plates, liquid droplets, and drizzle drops. Most of the previous work to remotely determine microphysics of stratus clouds has largely ignored the presence of drizzle and ice, restricting applicability to only liquid clouds with no drizzle, a relatively rare event. Since mixed phase

58

Microsoft PowerPoint - Project X Discussion_SDH.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne-Fermilab Collaboration on Argonne-Fermilab Collaboration on Project X (Accelerator) Steve Holmes projectx.fnal.gov Argonne-Fermilab Collaboration Meeting November 27, 2007 Page 2 ANL-FNAL Meeting, 11-27-07 - S. Holmes Outline * Project X Program - Steve H. - What is Project X? - November 12-13 Workshop - Areas of collaboration - Modes of collaboration * High Intensity Neutrino Source (HINS) Program - Giorgio A. - Goals of the program - Areas of collaboration - Relationship to Project X Page 3 ANL-FNAL Meeting, 11-27-07 - S. Holmes What is Project X? ILC-style 8 GeV H - linac: 9mA x 1 msec x 5 Hz 8 GeV slow/fast spill 200 kW 2.25E14 protons/1.4 sec Stripping Foil Recycler 3 linac pulse/fill Main Injector 1.4 sec cycle 120 GeV fast extraction 2.3 MW 1.7E14 protons/1.4 sec Single turn transfer @ 8 GeV NOνA initially,

59

DOE/EA-1584: Final Environmental Assessment for Sand Point Wind Installation Project, Sand Point, Alaska (September 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sand Point Wind Installation Project Sand Point, Alaska DOE/EA -1584 U.S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 September 2009 TABLE OF CONTENTS Page 1.0 INTRODUCTION .............................................................................................................. 1 1.1 NATIONAL ENVIRONMENTAL POLICY ACT AND RELATED PROCEDURES....................................................................................................... 1 1.2 BACKGROUND .................................................................................................... 1 1.3 PURPOSE AND NEED.......................................................................................... 2 1.4 PUBLIC SCOPING AND CONSULTATION.......................................................

60

Microsoft Word - Seven Mile CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 7, 2010 October 7, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum - Seven Mile Project Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Seven Mile Project Budget Information: Work Order 00211600 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.11 "Installation of fencing... that will not adversely affect wildlife of surface water flow." B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." B4.11 "Construction or electric power substations (including switching stations and support facilities) with power delivery at 230-kV or below, or modification (other than voltage increases) of existing

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Microsoft PowerPoint - States Project Map.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Performing Organizations Legend 2 Number of MVA projects Congressional District PTRC Canada 2 2 08 2 15 MA 2 01 1 01 01 15 01 1 PTRC - Canada 4 14 08 1 1 15 2 53 14 53 14 01 14...

62

Microsoft PowerPoint - Surash.AcquisitionProjectMgmt.042909  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Advisory Board J. E. Surash, P. E. Deputy Assistant Secretary Acquisition and Project Management April 29, 2009 2 Agenda Update on FY09 Plan for Acquisition & Contracting Small Business Activities Project Management Areas of Focus 3 Process Contact Handled Transuranic Debris and Soils Waste Process Remote Handled Transuranic Debris and Soils Waste Process Remote Handled Transuranic Sludge Waste Ship Transuranic Waste to Waste Isolation Pilot Plant Transuranic Waste Processing Center Oak Ridge, Tennessee Apr-May-Jun 2009 Jun 16, 2008 Apr 2, 2008 Award Industry Proposal Due Request for Proposals Estimated Value 3-year base, 2-year option: $150M-$200M (Small Business Set- Aside) Scope of Work 4 Waste Processing of Transuranic And Special Requirements Wastes

63

MHK Projects/Pointe du Bois | Open Energy Information  

Open Energy Info (EERE)

du Bois du Bois < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.2969,"lon":-95.5485,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

64

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

65

Miles Electric Vehicles | Open Energy Information  

Open Energy Info (EERE)

Miles Electric Vehicles Jump to: navigation, search Name Miles Electric Vehicles Place Santa Monica, California Zip 90405 Sector Vehicles Product California-based developer of...

66

MHK Projects/Pointe a la Hache Project | Open Energy Information  

Open Energy Info (EERE)

a la Hache Project a la Hache Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.5763,"lon":-89.7917,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

67

Points  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Selections Project Selections Announced October 26, 2009 Lead Research Organization (Partner Organizations) DOE Grant Amount Lead Organization Location Project Description 1366 Technologies Inc. (Massachusetts Institute of Technology - Lab for PV Research) $4,000,000 Lexington, MA Renewable Power (solar) "Direct Wafer" technology to form high efficiency "monocrystalline- equivalent" silicon wafers directly from molten silicon, with potential to halve the installed cost of solar photovoltaics. Agrivida, Inc. $4,565,800 Medford, MA Biomass Energy Cell wall-degrading enzymes grown within the plant itself that are activated after harvest, dramatically reducing the cost of cellulosic biofuels and chemicals Arizona State University (Fluidic Energy,

68

Pennsylvania Nuclear Profile - Three Mile Island  

U.S. Energy Information Administration (EIA) Indexed Site

Three Mile Island" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

69

Entiat 4Mile WELLs Completion Report, 2006.  

DOE Green Energy (OSTI)

The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen over a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were developed to a depth of 75 feet and 85 feet, respectively, and will be pumped with Submersible Turbine pumps. The irrigation wells have been fitted with new electric boxes and Siemens flowmeters (MAG8000).

Malinowksi, Richard

2007-01-01T23:59:59.000Z

70

Chapter 3. Vehicle-Miles Traveled  

U.S. Energy Information Administration (EIA) Indexed Site

3. Vehicle-Miles Traveled 3. Vehicle-Miles Traveled Chapter 3. Vehicle-Miles Traveled Vehicle-miles traveled--the number of miles that residential vehicles are driven--is probably the most important information collected by the Residential Transportation Energy Consumption Survey. Using the data on vehicle-miles traveled allows analysts to answer such questions as: "Are minivans driven more than passenger cars?" "Do people in the West drive more than people elsewhere?" "Do people conserve their new cars by driving them less?" "Who drives more--people in households with children, or other people?" "At what ages do people drive the most?" "How does growing income affect the amount of driving?" In addition to answering those kinds of questions, analysts also use the number of vehicle-miles traveled to compute estimated, on-road vehicle fuel consumption, economy, and expenditures, all of which have important implications for U.S. energy policy and national security (see Chapter 4).

71

Microsoft PowerPoint - Smart INL - EV Project Nissan Leaf Driving...  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Vehicle Driving and Charging Behavior Observed Early in The EV Project The EV Project John Smart, Idaho National Laboratory Stephen Schey, ECOtality North America 1...

72

Three Mile Canyon | Open Energy Information  

Open Energy Info (EERE)

Mile Canyon Mile Canyon Jump to: navigation, search Name Three Mile Canyon Facility Three Mile Canyon Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner John Deere Wind Developer Momentum RE Energy Purchaser PacifiCorp Location Morrow County OR Coordinates 45.717419°, -119.502258° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.717419,"lon":-119.502258,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

73

Pennsylvania Nuclear Profile - Three Mile Island  

U.S. Energy Information Administration (EIA)

snpt3pa8011 805 6,634 94.1 PWR Three Mile Island Unit Type Data for 2010 PWR = Pressurized Light Water Reactor. Note: Totals may not equal sum of ...

74

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

75

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network (OSTI)

In) Symposium on Nuclear Reactor Safety: Perspective. Ahealth effects of the nuclear reactor accident at Three Mile50-mile radius of the nuclear reactor site, approximately

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

76

1st Mile | Open Energy Information  

Open Energy Info (EERE)

Mile Mile Jump to: navigation, search Name 1st Mile Place Lyngby, Denmark Zip 2800 Product Denmark-based company that provides research and screening for venture capitalists. Website http://www.1stmile.dk/ Coordinates 56.866669°, 8.31667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.866669,"lon":8.31667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

77

Miles Below the Earth: The Next-Generation of Geothermal Energy |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Miles Below the Earth: The Next-Generation of Geothermal Energy Miles Below the Earth: The Next-Generation of Geothermal Energy Miles Below the Earth: The Next-Generation of Geothermal Energy February 7, 2011 - 12:34pm Addthis John Schueler John Schueler Former New Media Specialist, Office of Public Affairs What will the project do? Enhanced geothermal systems (EGS) essentially create man-made reservoirs that mimic naturally occurring pockets of steam- with the potential for use as a reliable, 24/7 source of renewable energy. For more than a century, traditional geothermal power plants have been generating electricity by extracting pockets of steam found miles below the Earth's surface. Until recently though, those plants could only be constructed in locations where pockets of steam had formed naturally. Enhanced geothermal systems (EGS) have been crafted to solve that problem

78

Sustainability at the project level : the case of Willets Point, Queens  

E-Print Network (OSTI)

Citywide sustainability planning creates a vision of how environmental concerns will shape urban development, but the way these plans are incorporated into individual development projects plays a large role in determining ...

Watson, Siobhan (Siobhan Therese)

2008-01-01T23:59:59.000Z

79

Thermal Power Systems, Point-Focusing Distributed Receiver Technology Project. Annual technical report, Fiscal Year 1978. Volume II. Detailed report  

DOE Green Energy (OSTI)

Thermal or electrical power from the sun's radiated energy through Point-Focusing Distributed Receiver technology is the goal of this Project. The energy thus produced must be economically competitive with other sources. This Project supports the industrial development of technology and hardware for extracting energy from solar power to achieve the stated goal. Present studies are working to concentrate the solar energy through mirrors or lenses, to a working fluid or gas, and through a power converter change it to an energy source useful to man. Rankine-cycle and Brayton-cycle engines are currently being developed as the most promising energy converters for our near future needs. Accomplishments on point-focusing technology in FY 1978 are detailed.

Not Available

1979-03-15T23:59:59.000Z

80

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

RM Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line. About Power Marketing...

82

Microsoft PowerPoint - Project DE_FE0000032 Student Modules.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

and and Research and Research 2011 Yearly Review Meeting P j t DE FE0002111 Project DE-FE0002111 Title: A Modular Curriculum for Training University Students in Industry Standard CO2 Sequestration and Enhanced Oil Recovery q y Methodologies University of Texas of the Permian Basin y Presenter: Dr. Robert Trentham, Director Center for Energy and Economic Diversification February 23, 2011 Project Participants Project Participants * Dr Robert C. Trentham, Co-PI (Geology, CO2) , ( gy, ) * Dr Emily Stoudt, Co-PI (Geology) * Mr Robert Kiker (Production Engineering, Plant ) Visits) * Mr Steve Melzer (Reservoir Engineering, CO2) M T i M G i (L d M t) * Ms Teri McGuigan (Land Management) * Mr EMr. Emmanuel Ede, student * Ms Ibukun Bode (IBK)

83

square miles | OpenEI Community  

Open Energy Info (EERE)

0 0 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235190 Varnish cache server square miles Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land use solar land use square miles I'm happy to announce that a new report on Solar+Land+Use was just released by the National+Renewable+Energy+Laboratory. You can find a brief summary of the results at the Solar+Land+Use page on OpenEI.

84

Microsoft PowerPoint - Vicksburg District Federal Power Projects Branson Conf. 6-2-10 .pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Vicksburg Vicksburg District Federal Power Projects Vicksburg District Federal Power Projects Blakely Mountain Hydro DeGray Hydro DeGray Hydro Narrows Hydro Blakely Mountain Rewind Unit #1 ll Rotor Installation Blakely Mountain Rewind Unit #2 l l Coil Removal Blakely Mountain Rewind Unit #2 l Pole Key Design Blakely Mountain Rewind Unit #2 i l i h l d Removing Pole Key With Sledge Hammer Blakely Rewind Unit #2 Bigger Hammer & Operator Blakely Mountain Rewind Unit #2 l h Removing Rotor Poles With A Saw Blakely Mountain Surge Tank f b h Refurbishment Blakely Mountain Surge Tank f b h Refurbishment Blakely Mountain Switchyard d Disconnect Upgrades Blakely Mountain Switchyard l Oil Containment DeGray Rewind Unit # 2 bl Disassembly DeGray Rewind Unit #2 l l First Coil Samples

85

Optimization of Hydroacoustic Equipment Deployments at Lookout Point and Cougar Dams, Willamette Valley Project, 2010  

DOE Green Energy (OSTI)

The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Lookout Point Dam (LOP) and the acoustic imaging system at Cougar Dam (CGR) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. The general approach was a multi-step process from mount design to final system configuration. The optimization effort resulted in successful deployments of hydroacoustic equipment at LOP and CGR.

Johnson, Gary E.; Khan, Fenton; Ploskey, Gene R.; Hughes, James S.; Fischer, Eric S.

2010-08-18T23:59:59.000Z

86

March 28, 1979: Three Mile Island | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1979: Three Mile Island March 28, 1979 A partial meltdown of the core occurs at one of the two reactors at the Three Mile Island nuclear power plant near Harrisburg, Pennsylvania...

87

Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Miles Traveled Vehicle Miles Traveled Tax Feasibility Evaluation to someone by E-mail Share Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Facebook Tweet about Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Twitter Bookmark Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Google Bookmark Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Delicious Rank Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Digg Find More places to share Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

88

Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Oregon Celebrates 200 Oregon Celebrates 200 Miles of Electric Highways to someone by E-mail Share Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Facebook Tweet about Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Twitter Bookmark Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Google Bookmark Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Delicious Rank Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Digg Find More places to share Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on AddThis.com... April 18, 2012 Oregon Celebrates 200 Miles of Electric Highways " These [electric charging] stations will help create a corridor that, by the

89

Microsoft PowerPoint - 04CifernoStanford - Capture Project Summary.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Program US Perspective on CO 2 Capture and Separation Jared P. Ciferno - National Energy Technology Laboratory Global Climate and Energy Project April 27, 2004 Stanford University GCEP - JPC - 4/27/04 Presentation Outline * Carbon Sequestration Program * Pre-Combustion CO 2 Technologies * Post-Combustion CO 2 Technologies * Oxy-Fuel Technologies * Modeling and Assessment Tools * On-Site NETL R & D GCEP - JPC - 4/27/04 * One of DOE's 17 national labs * Government owned/operated * Sites in Pennsylvania, West Virginia, Oklahoma, Alaska * More than 1,100 federal and support contractor employees * FY 03 budget of $750 million National Energy Technology Laboratory GCEP - JPC - 4/27/04 Carbon Sequestration Program Structure Infrastructure 7 Regional Partnerships * Engage regional, state, local

90

Wolf Point Substation, Roosevelt County, Montana  

Science Conference Proceedings (OSTI)

The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs.

Not Available

1991-05-01T23:59:59.000Z

91

Public Blink Charging Units Reporting Data in The EV Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Miles Idaho National Laboratory 662012 INLMIS-12-26073 Legend Project Regions Public Blink Charging Units Reporting Data in The EV Project Project to Date through March 2012...

92

Record of Decision for the Electrical Interconnection of the BP Cherry Point Cogeneration Project (DOE/EIS-0349) (11/10/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BP Cherry Poi BP Cherry Poi nt Cogeneration Project DECISION The Bonneville Power Administration (Bonneville) has decided to implement the proposed action identified in the BP Cherry Point Cogeneration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0349, August 2004). Under the proposed action, Bonneville will offer contract terms for interconnection of the BP Cherry Point Cogeneration Project (Project) with the Federal Columbia River Transmission System (FCRTS), as requested by BP West Coast Products, LLC (BP) and proposed in the FEIS. The proposed Project involves constructing and operating a new 720-megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 265-acre site adjacent to BP's existing Cherry Point Refinery between Ferndale and

93

square-mile Black Warrior Basin  

NLE Websites -- All DOE Office Websites (Extended Search)

will inject CO will inject CO 2 into a coalbed methane (CBM) well in Tuscaloosa County, Alabama, to assess the capability of mature CBM reservoirs to receive and adsorb large volumes of CO 2 . Injection began at the test site on June 15; the site was selected because it is representative of the 23,000- square-mile Black Warrior Basin located in northwestern Alabama and northeastern Mississippi. It is estimated that this area has the potential to store in the range of 1.1 to 2.3 Gigatons of CO 2 , which is approximately the amount that Alabama's coal-fired power plants emit in two decades. The targeted coal seams range from 940 to 1,800 feet deep and are one to six feet thick. Approximately 240 tons of CO 2 will be injected over a 45- to 60-day period. More information

94

Ozark 260-mile gas line system completed  

Science Conference Proceedings (OSTI)

Gathering gas in the Arkoma basin of Oklahoma and Arkansas for transport to market, the 260-mile Ozark gas line system runs from southwest of McAlester, Okla., to Natural Gas Pipeline Co. of America's station at Searcy, Ark. The recently completed mainline has an initial capacity of 170 million CF/day with a maximum operating pressure of 1200 psig and a delivery pressure of 700 psig at the NGPL station. The 20-in. pipeline is API 5LX-Grade X60, 0.281-in. wall thickness for Class 1 areas, 0.344 for Class 2 areas, 0.406 for Class 3 areas, and API 5LX-Grade X52, 0.500-in. wall thickness for river crossings.

Dixon, R.R.

1982-05-01T23:59:59.000Z

95

A GEM Award (Going the Extra Mile)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GEM Award GEM Award Going the Extra Mile A Gift Card Recognition Program Who may receive? All Headquarters Department of Energy Employees except Political Appointees (including Schedule C and non-career members of the SES). Any Employee may nominate. What is it? $25 or $50 Gift Cards from 100s Department Stores, Book Stores, Hotels and more. of nationally well known Movie Tickets, Restaurants, How do I do it? * Nominator fills out form. * Routes form through their organizational protocols. * Faxes or scans/emails to HQ Gift Card. * HQ Gift Card receives form, places order * Gift Certificate is sent to Recipient's Supervisor * Supervisor presents certificate to employee * Employee can redeem On-line or by phone for card their choice of When can I do this? HQ Gift Card is open for business now

96

Experiments on hydrogen for Three Mile Island  

DOE Green Energy (OSTI)

Starting on April 1, 1979, Billings Energy Corporation under the direction of EG and G Idaho, Inc., undertook a series of tests for Nuclear Regulatory Commission to provide information regarding (1) potential amount of hydrogen in the primary coolant water in the Three Mile Island 2 Reactor; (2) methods of scavenging gaseous hydrogen from the reactor system; and (3) the determination of the most efficient and also the safest means of depressurization. Although only small amounts of hydrogen were later found in the system, this study produced information of interest for similar accidents in which hydrogen remains in the system. No investigations of radiochemical effects were made; the study focused on non-radiation solubility and chemical effects.

Wooley, R.L.; Ruckman, J.H.; Kimball, G.L.; Ayers, A.L. Jr.; Liebenthal, J.L.

1980-01-01T23:59:59.000Z

97

Final environmental information volume for the coke oven gas cleaning project at the Bethlehem Steel Corporation Sparrows Point Plant  

Science Conference Proceedings (OSTI)

Bethelehem Steel Corporation (BSC) is planning to conduct a demonstration project involving an integrated system that can be retrofitted into coke oven gas handling systems to address a variety of environmental and operational factors in a more cost-effective manner. Successful application of this technology to existing US coke plants could: (1) reduce emissions of sulfur dioxide, cyanide, and volatile organic compounds (including benzene) (2) reduce the cost and handling of processing feed chemicals, (3) disposal costs of nuisance by-products and (4) increase reliability and reduce operation/maintenance requirements for coke oven gas desulfurization systems. The proposed system will remove sulfur from the coke oven gas in the form of hydrogen sulfide using the ammonia indigenous to the gas as the primary reactive chemical. Ammonia and hydrogen cyanide are also removed in this process. The hydrogen sulfide removed from the coke oven gas in routed to a modified Claus plant for conversion to a saleable sulfur by-product. Ammonia and hydrogen cyanide will be catalytically converted to hydrogen, nitrogen, carbon dioxide, and carbon monoxide. The tail gas from the sulfur recovery unit is recycled to the coke oven gas stream, upstream of the new gas cleaning system. The proposed demonstration project will be installed at the existing coke oven facilities at BSC's Sparrows Point Plant. This volume describes the proposed actions and the resulting environmental impacts. 21 refs., 19 figs., 9 tabs.

Not Available

1990-04-24T23:59:59.000Z

98

Salt Wells, Eight Mile Flat | Open Energy Information  

Open Energy Info (EERE)

Salt Wells, Eight Mile Flat Salt Wells, Eight Mile Flat Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells, Eight Mile Flat Abstract Abstract unavailable. Author Nevada Bureau of Mines and Geology Published Online Nevada Encyclopedia, 2009 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Salt Wells, Eight Mile Flat Citation Nevada Bureau of Mines and Geology. Salt Wells, Eight Mile Flat [Internet]. 2009. Online Nevada Encyclopedia. [updated 2009/03/24;cited 2013/08/07]. Available from: http://www.onlinenevada.org/articles/salt-wells-eight-mile-flat Related Geothermal Exploration Activities Activities (1) Areas (1) Regions (0) Development Wells At Salt Wells Area (Nevada Bureau of Mines and Geology, 2009) Salt Wells Geothermal Area

99

Digital Book Showcases Washington Wind Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Digital Book Showcases Washington Wind Project Digital Book Showcases Washington Wind Project Digital Book Showcases Washington Wind Project June 24, 2010 - 12:09pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE In what looks and feels more like an e-book on the iPad than a website, a new digital book by Cannon Power Group, a San Diego-based developer of utility-scale wind, tells the story of the construction of a 400 MW wind farm along a 26-mile stretch in Goldendale, Washington, located on a ridgeline plateau about 125 miles east of Portland, Oregon. "The New American Farm" chronicles the stages of the Windy Flats/Windy Point project in seven interactive chapters: from "Prospecting" (finding the right site) to "Planting" (installing 175, 300-foot turbines) to

100

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reduce Vehicle Miles Traveled Reduce Vehicle Miles Traveled Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled October 7, 2013 - 11:52am Addthis YOU ARE HERE: Step 3 For reducing greenhouse gas emissions, the table below describes petroleum reduction strategies to reduce vehicle miles traveled, as well as guidance and best practices for each strategy. Table 1. Determining When and How to Promote the Use of Strategies to Reduce Vehicle Miles Traveled Strategy When Applicable Best Practices Consolidate trips Applicable to all vehicles, regardless of ownership or vehicle and fuel type Target vehicle operators who take longer trips Seek vehicle operator input and collaboration to identify regular or occasional trips that involve similar routes. Determine whether trips on multiple days or times can be consolidated into a single trip.

102

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network (OSTI)

within 50 miles of the nuclear power plant was estimated tothe radiation from the nuclear power plant accident. From anand the Peach Bottom nuclear power plants, like the general

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

103

Odometer Versus Self-Reported Estimates of Vehicle Miles Traveled  

Reports and Publications (EIA)

The findings described here compare odometer readings with self-reported estimates of Vehicle Miles Traveled (VMT) to investigate to what extent self-reported VMT is a reliable surrogate for odometer-based VMT.

Information Center

2000-08-01T23:59:59.000Z

104

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

a whollyowned subsidiary of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing...

105

18 MILES NORTH OF PHlLADEl.PHlA HATBORO, PA. August  

Office of Legacy Management (LM)

8 MILES NORTH OF PHlLADEl.PHlA 8 MILES NORTH OF PHlLADEl.PHlA HATBORO, PA. August 27, 1948 ! ! Frank Giaccio' Commission / I This follows my letter of August ZOth, in which I promised to advise you of our thoughts concerning beryllium, after I had completed a series of con- tacts with both.Government and private,grou?s and had an opportunity to evaluate the possibilities of using our process from the point of view of industrial research. By this, I meanthe possibility of the research leading into substantial production of parts. I believe I mentioned some of the contacts to you when I was in your office, and that we still had more to make. It is my opinion now that as far as beryllium is concerned, I cannot visualize the possibility of large production runs of parts; because it is

106

Health effects of the nuclear accident at Three Mile Island  

SciTech Connect

Between March 28 and April 15, 1979 the collective dose resulting from the radioactivity released to the population living within a 50-mile radius of the Three Mile Island nuclear plant was about 2000 person-rems, less than 1% of the annual natural background level. The average dose to a person living within 5 miles of the nuclear plant was less than 10% of annual background radiation. The maximum estimated radiation dose received by any one individual in the general population (excluding the nuclear plant workers) during the accident was 70 mrem. The doses received by the general population as a result of the accident were so small that there will be no detectable additional cases of cancer, developmental abnormalities, or genetic ill-health. Three Three Mile Island nuclear workers received radiation doses of about 3 to 4 rem, exceeding maximum permissible quarterly dose of 3 rem. The major health effect of the accident at Three Mile Island was that of a pronounced demoralizing effect on the general population in the Three Mile Island area, including teenagers and mothers of preschool children and the nuclear plant workers. However, this effect proved transient in all groups studied except the nuclear workers.

Fabrikant, J.I.

1980-05-01T23:59:59.000Z

107

50,000 mile methanol/gasoline blend fleet study: a progress report  

DOE Green Energy (OSTI)

Seven current production automobiles are being used in a fleet study to obtain operational experience in using 10% methanol/90% gasoline blends as an automotive fuel. Data from chassis dynamometer tests (run according to the 1975--1978 Federal test procedure) have been obtained, showing fuel economy and exhaust emissions of carbon monoxide, oxides of nitrogen, unburned fuel, methanol, and aldehydes. These data are shown for each of the vehicles when operated on the 10% methanol blend, and on unleaded low octane Indolene. Chassis dynamometer tests were run at 5,000-mile intervals during the 35,000 miles accumulated on each of the four 1977 model-year vehicles and at 5,000 and 10,000 mile accumulation levels for each of the three 1978 model-year vehicles. These data show an average decrease in volumetric fuel economy (approx. = 5%) and a reduction in carbon monoxide emissions associated with the use of the 10% methanol blend. Exhaust emission deterioration factors are projected from the Federal test procedure urban cycle data. The most severe driveability problems that have been encountered thus far into the program are related to operating on a phase separated fuel and materials compatibility problems with an elastomer in the air-fuel control hardware of one vehicle.

Stamper, K R

1979-01-01T23:59:59.000Z

108

Microsoft PowerPoint - 16.1225_Terry Cooke-Davies - Project Complexity as of 16 Mar  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Complexity Complexity Dr Terry Cooke-Davies, Group Chairman Group Chairman, Human Systems International Talking about Complexity Talking about Complexity Causes of Complexity in Projects Projects Today's Talk Responses to Complexity y 2 Why do we do it, and what do we mean when we are Talking about Complexity? g p y 3 What is Complexity? * No generally agreed definition What is Complexity? No generally agreed definition - "If you don't know what will happen when you kick it, then it is complex." * Any definition risks being inadequate * Any definition risks being inadequate - "Complex" is different from "Complicated" - Complexity is both relative and absolute. What is Complexity p y 4 Why are we so interested in it? * Need for managers of more challenging projects F il f

109

Seven Mile Hole Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Seven Mile Hole Geothermal Area (Redirected from Seven Mile Hole Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Seven Mile Hole Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (4) 10 References Area Overview Geothermal Area Profile Location: Wyoming Exploration Region: Yellowstone Caldera Geothermal Region GEA Development Phase:

110

Seven Mile Hole Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Seven Mile Hole Geothermal Area Seven Mile Hole Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Seven Mile Hole Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (4) 10 References Area Overview Geothermal Area Profile Location: Wyoming Exploration Region: Yellowstone Caldera Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

111

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region (RMCCS) Dr. Vince Matthews - Colorado Geological Survey Wayne Rowe - Schlumberger Carbon Services Bill O'Dowd RMCCS * Project Overview - Regional Geology - Site Specific Characterization - Basin-wide Characterization * Well Construction RMCCS * Project Overview - Regional Geology - Site Specific Characterization - Basin-wide Characterization * Well Construction 4.8 miles North South Dakota Sandstone Chinle Entrada contact . Example of fracture behavior in steeply dipping Entrada sandstone Weber sandstone outcrop White Rim Sandstone The Plan - Year 1 Characterize the Structure Pick location for drill hole Build database Purchase seismic Process & interpret seismic Map surface structure Shoot additional seismic lines Permit well Dakota Structure Around Strat Test Well Locations of Reprocessed

112

Research and development activities on Three Mile Island Unit Two. Annual report for 1985  

Science Conference Proceedings (OSTI)

The year 1985 was significant in the cleanup of Three Mile Island Unit 2 (TMI-2). Major milestones in the project included lifting the plenum assembly from the reactor vessel and the start of operations to remove the damaged fuel from the reactor. This report summarizes these milestones and other TMI-2 related cleanup, research, and development activities. Other major topics include the following: waste immobilization and management; fuel shipping cask delivery and testing; sample acquisition and evaluation; and decontamination and dose reduction. 26 figs.

Not Available

1986-04-01T23:59:59.000Z

113

Development of a Toolkit for Calculating Linear, Change-Point Linear and Multiple-Linear Inverse Building Energy Analysis Models, ASHRAE Research Project 1050-RP, Final Report  

E-Print Network (OSTI)

This report summarizes the results of ASHRAE Research Project 1050: Development of a Toolkit for Calculating Linear, Change-Point Linear and Multiple Linear Inverse Building Energy Analysis Models. The Inverse Modeling Toolkit (WIT) is a FORTRAN 90 application for developing regression models of building energy use. IMT can identify single and multi-variable least-squares regression models. It can also identify variable-base degree-day and single and multi-variable change-point models, which have been shown to be especially useful for modeling building energy use. This report includes background information about IMT and the models, instructions for its installation and operation, and the results of accuracy and robustness testing.

Kissock, J. K.; Haberl, J. S.; Claridge, D. E.

2002-11-01T23:59:59.000Z

114

SOLERAS - Solar Energy Water Desalination Project: DSET Laboratories. Performance testing of the fresnel point focus concentrating dish  

Science Conference Proceedings (OSTI)

The thernal performance of an 80.3 m/sup 2/ (864 ft/sup 2/) Power Kinetics, Inc. (PKI) fresnel point focus concentrating dish was measured over a period of seven months using SYLTHERM 800 as the heat transfer fluid. Three stages of testing were conducted; initial performance, extended all day operational, and final performance testing. The initial and final performance tests each used three different procedures to measure efficiency in order to quantify the solar concentrator's performance. The all day operational testing represented the ''in situ'' performance of the dish. During the seven months of performance testing, the operation of the dish was thoroughly monitored. All significant problems affecting the normal functioning of the PKI solar concentrator are noted in this report along with any corrective action taken to rectify the problems. Also, a small exposure program was conducted on mirror samples to determine if any reduction in total and specular reflectance occurred due to dirt retention on the mirrors.

Not Available

1985-01-01T23:59:59.000Z

115

Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles  

NLE Websites -- All DOE Office Websites (Extended Search)

9: April 25, 9: April 25, 2005 Medium-Truck Miles by Age to someone by E-mail Share Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Facebook Tweet about Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Twitter Bookmark Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Google Bookmark Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Delicious Rank Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Digg Find More places to share Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on AddThis.com... Fact #369: April 25, 2005 Medium-Truck Miles by Age Medium trucks (class 3-6) were driven an average of 14,439 miles in 2002.

116

Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.  

SciTech Connect

The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on the mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included development of a 105-foot well for off-stream livestock watering at approximately River Mile 12.0 Wildhorse Creek and construction of an engineered stream ford at approximately River Mile 3.0 Mission Creek. A total of $277,848 in financial cost share assistance was provided by the Confederated Tribes of the Umatilla Indian Reservation, U.S. Bureau of Indian Affairs, U.S. Environmental Protection Agency, U.S. Department of Agriculture, National Oceanic and Atmospheric Administration, U.S. Workforce Investment Act, Oregon Watershed Enhancement Board, Umatilla County and Pheasants Forever for planning efforts and habitat enhancements. Monitoring continued to quantify baseline conditions and the effects of habitat enhancements in the upper basin. Daily stream temperatures were collected from June through September at 22 sites. Suspended sediment samples were obtained at three gage stations to arrive at daily sediment load estimates. Photographs were taken at 96 existing and three newly established photo points to document habitat recovery and pre-project conditions. Transects were measured at three stream channel cross sections to assist with engineering and design and to obtain baseline data regarding channel morphology. Biological inventories were conducted at River Mile 3.0 Mission Creek to determine pre-project fish utilization above and below the passage barrier. Post-project inventories were also conducted at River Mile 85.0 of the Umatilla River at a project site completed in 1999. Umatilla Subbasin Watershed Assessment efforts were continued under a subcontract with Eco-Pacific. This watershed assessment document and working databases will be completed in fiscal year 2002 and made available to assist project personnel with sub-watershed prioritization of habitat needs. Water Works Consulting, Duck Creek Associates and Ed Salminen Consulting were subcontracted for watershed assessment and restoration planning in the Meacham Creek Subwatershed. A document detailing current conditions in the Meacham Creek Subwatershed and necessary restoration actions will be availa

Shaw, R. Todd; Sexton, Amy D.

2003-02-01T23:59:59.000Z

117

one mile underground into a deep saline formation. The injection  

NLE Websites -- All DOE Office Websites (Extended Search)

mile underground into a deep saline formation. The injection, mile underground into a deep saline formation. The injection, which will occur over a three-year period and is slated to start in early 2010, will compress up to 1 million metric tonnes of CO 2 from the ADM ethanol facility into a liquid-like, dense phase. The targeted rock formation, the Mt. Simon Sandstone, is the thickest and most widespread saline reservoir in the Illinois Basin, with an estimated CO 2 storage capacity of 27 to 109 billion metric tonnes. A comprehensive monitoring program, which will be evaluated yearly, will be implemented after the injection to ensure the injected CO 2 is stored safely and permanently. The RCSP Program was launched by the Office of Fossil Energy (FE)

118

Seven Mile, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Mile, Ohio: Energy Resources Mile, Ohio: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.480056°, -84.5518916° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.480056,"lon":-84.5518916,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

119

EAMidnightPointMahogany  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon April 2013 Prepared By Bureau of Land Management - Prineville and Burns...

120

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

project was authorized by the Flood Control Act approved 18 project was authorized by the Flood Control Act approved 18 August 1941 (Public No. 228, 77 th Congress, 1 st Session). Construction of the access road began in April 1946. Construction of Narrows Dam started in May 1947 and the structure was essentially completed by July 1950. Commercial operation began May 1950 on Units #1 and #2. Commercial operation began September 1969 on Unit #3. The Narrow Dam is located on the Little Missouri River, a tributary of the Ouachita River near Murfreesboro in Pike County, Arkansas. It is a multi-purpose project for flood and power generation. Maximum Pool 7,260 Acres Shoreline 134 Miles Type Concrete Gravity Crest Elevation 581 Feet,msl Spillway Type Concrete, Uncontrolled Spillway Crest Elevation 563 Feet,msl Number of Units

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

122

Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per  

NLE Websites -- All DOE Office Websites (Extended Search)

3: June 11, 2007 3: June 11, 2007 Vehicle-Miles per Licensed Driver to someone by E-mail Share Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Facebook Tweet about Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Twitter Bookmark Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Google Bookmark Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Delicious Rank Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Digg Find More places to share Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on AddThis.com... Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver

123

Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 (thousand miles) History Reference case 1970.00 $8.69 1971.00 $9.01

124

894 AP880212-0103 -1 ville is 60 miles east of Aspen , 40 ...  

Science Conference Proceedings (OSTI)

894 AP880212-0103 -1 ville is 60 miles east of Aspen , 40 miles south o 894 AP880328-0088 -1 all overnight , while 6 inches was reported at Asp ...

2002-04-29T23:59:59.000Z

125

BP Cherry Point Congeneration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responses to Comments Responses to Comments DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers August 2004 Volume 2 TABLE OF CONTENTS Page ACRONYMS AND ABBREVIATIONS ......................................................................................................... i 1. INTRODUCTION TO VOLUME 2, RESPONSES TO COMMENTS ....................................... 1 1.1 Background .............................................................................................................................. 1 1.2 Organization of Volume 2 ....................................................................................................... 1 1.3 References Cited in Volume 2.................................................................................................

126

END POINTS MANAGEMENT End Points Management The Need for End Point Specifications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT MANAGEMENT End Points Management The Need for End Point Specifications The Need for a Method to Derive End Points Guiding Principles for Specifying End Points Tailored Approach Headquarters, Field Office, and Contractor Roles End Points Approvals Contractor Organization Functions for End Points Implementation Training and Walkdown Guidance for the Facility Engineers The Need for End Point Specifications The policy of the EM is that a formal project management approach be used for the planning, managing, and conducting of its projects. A fundamental premise of project management for facility deactivation is answering the question: How do you know when the project is complete? Just as the design specifications are essential to a

127

Vegetation survey of Pen Branch and Four Mile Creek wetlands  

SciTech Connect

One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

Not Available

1992-01-01T23:59:59.000Z

128

Vegetation survey of Pen Branch and Four Mile Creek wetlands  

Science Conference Proceedings (OSTI)

One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

Not Available

1992-10-01T23:59:59.000Z

129

Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of  

NLE Websites -- All DOE Office Websites (Extended Search)

2: January 5, 2: January 5, 2009 Vehicle Miles of Travel by Region to someone by E-mail Share Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Facebook Tweet about Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Twitter Bookmark Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Google Bookmark Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Delicious Rank Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Digg Find More places to share Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on AddThis.com... Fact #552: January 5, 2009

130

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

11 North American Power Group, Ltd. 11 North American Power Group, Ltd. November 17, 2011 North American Power Group, Ltd. Two Elk Energy Park Carbon Site Characterization Study Preliminary Geologic Model-Update DOE NETL Annual Meeting November, 15-17, 2011 North American Power Group Copyright 2011 NAPG Two Elk Project Location 2 North American Power Group Copyright 2011 NAPG Work Flow and Project Integration 3 North American Power Group Copyright 2011 NAPG Modeling Approach  Model basin architecture is basically constructed from data within a 25 x 25 mile square area  Geologists reviewed data and correlated tops and surfaces  Porosity, permeability, petrophysics and other information correlated from that data to create a baseline model  Additional data has yet to be added from seismic information and from on-site penetrations

131

Methane Gas Utilization Project from Landfill at Ellery (NY)  

DOE Green Energy (OSTI)

Landfill Gas to Electric Energy Generation and Transmission at Chautauqua County Landfill, Town of Ellery, New York. The goal of this project was to create a practical method with which the energy, of the landfill gas produced by the decomposing waste at the Chautauqua County Landfill, could be utilized. This goal was accomplished with the construction of a landfill gas to electric energy plant (originally 6.4MW and now 9.6MW) and the construction of an inter-connection power-line, from the power-plant to the nearest (5.5 miles) power-grid point.

Pantelis K. Panteli

2012-01-10T23:59:59.000Z

132

Residential Blink Charging Units Reporting Data in The EV Project  

NLE Websites -- All DOE Office Websites (Extended Search)

49 Knoxville 95 Washington D.C. 102 0 125 62.5 250 375 500 Miles Legend Project Regions All EV Project residential charging units are AC Level 2. Idaho National Laboratory 815...

133

Residential Blink Charging Units Reporting Data in The EV Project  

NLE Websites -- All DOE Office Websites (Extended Search)

40 Knoxville 87 Washington D.C. 83 0 125 62.5 250 375 500 Miles Legend Project Regions All EV Project residential charging units are AC Level 2. Idaho National Laboratory 66...

134

Woodrow Wilson Bridge Project  

Science Conference Proceedings (OSTI)

A detailed 3D model was created to show the 500-million dollar construction project of a 10-mile section of I-95 at the Virginia / Maryland Border, it includes four multi-level interchanges and a major bridge (Woodrow Wilson Bridge) across the Potomac ... Keywords: Electronic Theatre 2001

Jeff Coleman

2001-08-01T23:59:59.000Z

135

Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of  

NLE Websites -- All DOE Office Websites (Extended Search)

7: July 29, 2002 7: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type to someone by E-mail Share Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Facebook Tweet about Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Twitter Bookmark Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Google Bookmark Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Delicious Rank Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Digg Find More places to share Vehicle Technologies Office: Fact #227:

136

Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of  

NLE Websites -- All DOE Office Websites (Extended Search)

5: September 8, 5: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 to someone by E-mail Share Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Facebook Tweet about Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Twitter Bookmark Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Google Bookmark Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Delicious Rank Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Digg Find More places to share Vehicle Technologies Office: Fact #535:

137

Light Water Reactor Sustainability Constellation Pilot Project FY12 Summary Report  

SciTech Connect

Summary report for Light Water Reactor Sustainability (LWRS) activities related to the R. E. Ginna and Nine Mile Point Unit 1 for FY12.

R. Johansen

2012-09-01T23:59:59.000Z

138

Light Water Reactor Sustainability Constellation Pilot Project FY13 Summary Report  

SciTech Connect

Summary report for Light Water Reactor Sustainability (LWRS) activities related to the R. E. Ginna and Nine Mile Point Unit 1 for FY13.

R. Johansen

2013-09-01T23:59:59.000Z

139

Figure 1.8 Motor Vehicle Fuel Economy, 1973-2011 (Miles per Gallon)  

U.S. Energy Information Administration (EIA)

Figure 1.8 Motor Vehicle Fuel Economy, 1973-2011 (Miles per Gallon) U.S. Energy Information Administration / Monthly Energy Review August 2013 17

140

Three Mile Island accident and post-accident recovery: what did we learn  

SciTech Connect

A description of the accident at Three Mile Island-2 reactor is presented. Activities related to the cleanup and decontamination of the reactor are described.

Collins, E.D.

1982-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Table A1. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel ...  

U.S. Energy Information Administration (EIA)

Number of Vehicles Vehicle-Miles Traveled Motor Fuel Consumption Motor Fuel 2001 Household and Vehicle Expenditures ... Age of Primary Driver 16 to 17 Years ...

142

TMI-2 (Three Mile Island Unit 2) core region defueling  

SciTech Connect

In July of 1982, a video camera was inserted into the Three Mile Island Unit 2 reactor vessel providing the first visual evidence of core damage. This inspection, and numerous subsequent data acquisition tasks, revealed a central void /approx/1.5 m (5 ft) deep. This void region was surrounded by partial length fuel assemblies and ringed on the periphery by /approx/40 full-length, but partial cross-section, fuel assemblies. All of the original 177 fuel assemblies exhibited signs of damage. The bottom of the void cavity was covered with a bed of granular rubble, fuel assembly upper end fittings, control rod spiders, fuel rod fragments, and fuel pellets. It was obvious that the normal plant refueling system not suitable for removing the damaged core. A new system of defueling tools and equipment was necessary to perform this task. Design of the new system was started immediately, followed by >1 yr of fabrication. Delivery and checkout of the defueling system occurred in mid-1985. Actual defueling was initiated in late 1985 with removal of the debris bed at the bottom of the core void. Obstructions to the debris, such as end fittings and fuel rod fragments ere removed first; then /approx/23,000 kg (50,000lb) of granular debris was quickly loaded into canisters. Core region defueling was completed in late 1987, /approx/2 yr after it was initiated.

Rodabaugh, J.M.; Cowser, D.K.

1988-01-01T23:59:59.000Z

143

El Paso electric 345 kV, Springerville to Deming, transmission line project, New Mexico  

SciTech Connect

Construction of a 213.5-mile, 345-kilovolt (kV) transmission line is proposed from the El Paso Electric Company Luna substation, 1.5 miles north of Deming, to a point on the existing Tucson Electric Power Company transmission line near Red Hill, in New Mexico. Counties in New Mexico that could be directly affected are Luna, Sierra, Socorro, Catron, and Grant. The proposed line would use wood towers, 51 to 55 feet high, placed at an average interval of 800 feet. More equipment would be added to the Luna substation, consisting of a 345-kV circuit breaker, two switches, a dead-end tower, and relay equipment. Communication and control would be provided through a microwave radio system. The transmission line would be paralleled by a two-track road for routine patrol. Estimated cost of the project is $42.9 million.

Not Available

1985-07-01T23:59:59.000Z

144

EIS-0474: Southline Transmission Project, Arizona and New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

DOEs Western Area Power Administration is preparing this EIS to evaluate the environmental impacts of the proposed Southline Transmission Project, which would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations.

145

Incorporating uncertainty in vehicle miles traveled projections of the National Energy Modeling System.  

E-Print Network (OSTI)

??The National Energy Modeling System (NEMS) is a computational model that forecasts the production, consumption, and prices of energy in the United States. Although NEMS (more)

Poetting, David Michael

2011-01-01T23:59:59.000Z

146

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Characterization - Basin-wide Characterization * Well Construction 4.8 miles North South Dakota Sandstone Chinle Entrada contact . Example of fracture behavior in steeply...

147

DOE/EIS-0324; Umatilla Generating Project (082001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Umatilla Generating Company Umatilla Generating Company UMATILLA GENERATING PROJECT Project Location Map March 2001 Figure 2.1 N S S U m a tilla R . Umatilla Hermiston " # 1 $ " # 0 $ 0.5 0 0.5 1 Kilometers 0.5 0 0.5 1 Miles GTN Intertie BPA Interconnection Point Existing Transmission Line to be Reconductored Water and Gas Pipeline Corridor New Transmission Line on New Towers Existing Transmission Line to be Reconductored Proposed GTN Gas Pipeline Alternative 1 Proposed GTN Gas Pipeline Alternative 2 Proposed CNG Gas Pipeline Alternative Existing PG&E GTN Mainline Power Plant Site Hermiston Generating Plant Water and Gas Pipeline Corridor Print Date: March 28, 2001 k:\umatilla_new\apr\eis_sec2.apr 1:55000 Umatilla Chemical Depot Co lu m b ia R iv e r Hermiston Pendleton Portland Eugene " # / $ ) 9 " # 1 $ Overview of Location in the State of Oregon

148

Rock Sampling At Seven Mile Hole Area (Larson, Et Al., 2009) | Open Energy  

Open Energy Info (EERE)

Seven Mile Hole Area (Larson, Et Al., 2009) Seven Mile Hole Area (Larson, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Rock Sampling At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Rock Sampling Activity Date Usefulness not indicated DOE-funding Unknown Notes The distribution of hydrothermally altered rocks was mapped over about 1 km2 in the Sevenmile Hole area. Two to four kilogram hand samples located by a handheld GPS were collected from many outcrops for laboratory analyses References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The

149

Autonomous personal vehicle for the first- and last-mile transportation services  

E-Print Network (OSTI)

This paper describes an autonomous vehicle testbed that aims at providing the first- and last- mile transportation services. The vehicle mainly operates in a crowded urban environment whose features can be extracted a ...

Chong, Z. J.

150

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Energy.gov (U.S. Department of Energy (DOE))

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

151

Does telecommuting reduce vehicle-miles traveled? An aggregate time series analysis for the US  

E-Print Network (OSTI)

of Telecommuting. US DOE Office of Policy, Planning, andProgram Evaluation, Report No. DOE/PO-0026, Washington, DC.Holtzclaw, John (undated): Does a mile in a car equal a

Choo, Sangho; Mokhtarian, Patricia L; Salomon, Ilan

2005-01-01T23:59:59.000Z

152

Field Mapping At Seven Mile Hole Area (Larson, Et Al., 2009) | Open Energy  

Open Energy Info (EERE)

Seven Mile Hole Area (Larson, Et Al., 2009) Seven Mile Hole Area (Larson, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Field Mapping Activity Date Usefulness not indicated DOE-funding Unknown Notes The distribution of hydrothermally altered rocks was mapped over about 1 km2 in the Sevenmile Hole area. Two to four kilogram hand samples located by a handheld GPS were collected from many outcrops K735for laboratory analyses References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The

153

NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT  

SciTech Connect

The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

Terry W. Battiest

2008-06-11T23:59:59.000Z

154

Nonuniform character of the population of spin projections K for a fissile nucleus at the scission point and anisotropies in the angular distributions of fragments originating from the induced fission of nuclei  

Science Conference Proceedings (OSTI)

It is shown that the emergence of anisotropies in the angular distributions of fragments originating from the spontaneous and induced fission of oriented actinide nuclei is possible only if nonuniformities in the population of the projectionsM (K) of the fissile-nucleus spin onto the z axis of the laboratory frame (fissile-nucleus symmetry axis) appear simultaneously in the vicinity of the scission point but not in the vicinity of the outer saddle point of the deformation potential. The possibilities for creating the orientation of fissile nuclei for spontaneous and induced fission and the effect of these orientations on the anisotropies under analysis are considered. The role of Coriolis interaction as a unique source of the mixing of different-K fissile-nucleus states at all stages of the fission process is studied with allowance for the dynamical enhancement of this interaction for excited thermalized states of the nucleus involved that is characterized by a high energy density. It is shown that the absence of thermalization of excited states of the fissile nucleus that appear because of the effect of nonadiabaticity of its collective deformation motion in the vicinity of the scission point is a condition of conservation of the influence that transition fission states formed at the inner and outer fission barriers exerts on the distribution of the spin projections K for lowenergy spontaneous nuclear fission. It is confirmed that anisotropies observed in the angular distributions of fragments originating from the fission of nuclei that is induced by fast light particles (multiply charged ions) are due to the appearance of strongly excited equilibrium(nonequilibrium) states of the fissile nucleus in the vicinity of its scission point that have a Gibbs (non-Gibbs) distribution of projections K.

Kadmensky, S. G., E-mail: kadmensky@phys.vsu.ru [Voronezh State University (Russian Federation); Bunakov, V. E. [Russian Academy of Sciences, Petersburg Nuclear Physics Institute (Russian Federation); Kadmensky, S. S. [Voronezh State University (Russian Federation)

2012-11-15T23:59:59.000Z

155

Residential Blink Charging Units Reporting Data in The EV Project  

NLE Websites -- All DOE Office Websites (Extended Search)

125 250 375 500 62.5 Miles Idaho National Laboratory 10162012 INLMIS-12-26074 All EV Project residential charging units are AC Level 2. Residential Blink Charging Units...

156

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John Nangle, National Renewable Energy Laboratory (NREL) John Nangle, National Renewable Energy Laboratory (NREL) Tribal Leader Forum, Phoenix, AZ - May 30 - 31, 2013 State Incentives and Project Impacts Main Points - Market Context * State Renewable Portfolio Standards (RPS) - What are they? - How can they help your project? - Potential gap means more market demand for RE projects Starting a Renewable Energy Project * What renewable resources exist? * What sites with resources do you own? * To whom will you sell the electricity? * How will federal and state incentives or policies impact your project? * Access to transmission * Other policies - Interconnection standards - Environmental standards Renewable Portfolio Standard (RPS) * A requirement set by a state for utilities to generate x% of electricity from renewables by a specific date

157

DSW Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

158

Toward 300 Miles on a Single Charge? | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Toward 300 Miles on a Single Charge? Toward 300 Miles on a Single Charge? Discovery & Innovation Stories of Discovery & Innovation Brief Science Highlights SBIR/STTR Highlights Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 11.27.13 Toward 300 Miles on a Single Charge? Berkeley Lab scientists design a high-performance, long cycle-life lithium-sulfur battery. Print Text Size: A A A Subscribe FeedbackShare Page Click to enlarge photo. Enlarge Photo Scanning electron microscope image of sulfur graphene oxide. Photo courtesy of Lawrence Berkeley National Laboratory Scanning electron microscope image of sulfur graphene oxide. The batteries that pervade your life these days-from your cell phone to your sleek new tablet and even to your automobile, if you happen to drive

159

Isotopic Analysis At Seven Mile Hole Area (Larson, Et Al., 2009) | Open  

Open Energy Info (EERE)

2009) 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis- Rock At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Isotopic Analysis- Rock Activity Date Usefulness useful DOE-funding Unknown Notes The 40Ar/39Ar data were collected from a single fragment of alunite from sample Y-05-25, approximately 0.5 cm3 in size. References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Retrieved from "http://en.openei.org/w/index.php?title=Isotopic_Analysis_At_Seven_Mile_Hole_Area_(Larson,_Et_Al.,_2009)&oldid=68747

160

Talking Points  

U.S. Energy Information Administration (EIA) Indexed Site

Talking Points Talking Points NATURAL GAS MARKET INTEGRITY: How EIA Helps Presentation by William F. Hederman Congressional Research Service at EIA 30 th Anniversary Conference April 8, 2008 Washington, DC INTRODUCTION 1. Price levels and volatility cause suspicions. 2. Actual integrity and perceived integrity are both important for markets. 3. EIA was created in response to a crisis of confidence in energy market information. CANDIDATE INTEGRITY CRITERIA 1. Transparency 2. Efficiency (gathering, reporting, monitoring data) v. equity 3. Stability/predictability v. dynamism/volatility 4. Clarity (understanding) "DRAFT" TEN COMMANDMENTS/SUGGESTIONS 1. First presented at World Energy Congress, Rome, Nov. 2007 panel on Energy Market Integrity.

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Proposed study program of the effects on Hanford of a dam at Columbia River mile 348  

DOE Green Energy (OSTI)

At the request of Hanford Operations Office, Atomic Energy Commission, a study was made of the effects on the Hanford Facilities of a navigation and power dam at Columbia River mile 348, about five miles upstream of the 300 Area. The original study was based on a nominal slack-water pool elevation of 395 to 400 feet at the dam location. A supplemental study evaluated the effects on plant facilities of a dam at the same location but with slack-water pool elevation of 385 feet. In addition to effects of the dam on Hanford, a study was performed to evaluate the effects the dam would have on the environment.

Jasko, R.T.

1959-06-30T23:59:59.000Z

162

Comparative analysis of nuclear crisis communication: 2011 Fukushima nuclear crisis and 1979 Three Mile Island nuclear crisis.  

E-Print Network (OSTI)

??This paper examines the crisis management of two prominent nuclear crises - 2011 Fukushima Nuclear Crisis in Japan and 1979 Three Mile Island Nuclear Crisis (more)

Lu, Yang

2012-01-01T23:59:59.000Z

163

CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.  

DOE Green Energy (OSTI)

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).

Hoverson, Eric D.; Amonette, Alexandra

2009-02-09T23:59:59.000Z

164

ASSESSMENT OF A FLOW ENHANCEMENT PROJECT AS A RIPARIAN AND FISHERY HABITAT MITIGATION EFFORT  

E-Print Network (OSTI)

project in the Little Snake River Drainage, Wyoming, the flow in a previously ephemeral watercourse the North Platte River basin of southeast Wyoming, 20 miles east of Laramie within the boundaries and Crystal Lake Reservoirs. The upper 5.5 miles of stream is on national forest lands while the lower 4

165

Umatilla River Basin Anadromous Fish Habitat Enhancement Project: 1990 Annual Report.  

DOE Green Energy (OSTI)

The Umatilla habitat improvement program is funded under the Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program measure 704 (d) (1) 34.02, and targets the improvement of water quality and the restoration of riparian areas, spawning and rearing habitat of steelhead, spring and fall chinook and coho salmon. The Confederated Tribes of the Umatilla Indian Reservation are responsible for enhancing stream reaches within the Reservation boundaries as guided by an implementation plan developed cooperatively with the Oregon Department of Fish and Wildlife and the USDA Forest Service, Umatilla National Forest. Treatment areas included the lower 4 miles of Meacham Creek, the lower {1/4} mile of Boston Canyon Creek, and the Umatilla River between RM 78.5 and 80. The upper {1/2} of the Meacham Creek project area including Boston Canyon Creek, which were initially enhanced during 1989, were reentered for maintenance and continued enhancements. Approximately 2400 cu. yds. of boulders and 1000 cu. yds. of riprap was used in the construction of in-stream, stream bank and flood plain structures and in the anchoring of large organic debris (LOD) placements. In-stream structures were designed to increase instream cover and channel stability and develop of a defined thalweg to focus low summer flows. Flood plain structures were designed to reduce sediment inputs and facilitate deposition on flood plains. Riparian recovery was enhanced through the planting of over 1000 willow cuttings and 400 lbs. of grass seed mix and through the exclusion of livestock from the riparian corridor with 4.5 miles of high tensile smooth wire fence. Photo documentation and elevational transects were used to monitor changes in channel morphology and riparian recovery at permanent standardized points throughout the projects. Water quality (temperature and turbidity) data was collected at locations within the project area and in tributaries programmed for future enhancements.

Scheeler, Carl A.

1991-01-01T23:59:59.000Z

166

EAMidnightPointMahogany  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon April 2013 Prepared By Bureau of Land Management - Prineville and Burns Districts DOI-BLM-OR-P040-2011-0021-EA DOE/EA-1925 Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon April 2013 Lead Agency United States Department of the Interior Bureau of Land Management Prineville District 3050 N.E. 3rd Street, Prineville, OR 97754 Tel: 541 416 6700 Burns District 28910 Hwy 20 West, Hines, OR 97738 Tel: 541 573 4400 Cooperating Agency United States Department of Energy Golden Field Office Golden, Colorado 80401 Tel: 720-356-1563 Fax: 720-356-1560 April 2013 Environmental Assessment Table of Contents 1

167

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

168

SUBJECT: SYCAMORE COGENERATION PROJECT (84-AFC-6C) Staff Analysis of Proposed Modifications to Operate the Combustion Gas Turbine Unites in an Extended Startup Mode  

E-Print Network (OSTI)

California Energy Commission (Energy Commission) to amend the Energy Commissions Final Decision (Decision) for the Sycamore Cogeneration project. Staff prepared an analysis of this proposed change and a copy is enclosed for your information and review. The Sycamore Cogeneration project is a 300 megawatt cogeneration power plant located approximately five miles north of the City of Bakersfield, and five miles east of

Edmund G. Brown

2011-01-01T23:59:59.000Z

169

Windy Gap Firming Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Windy Gap Firming Project Windy Gap Firming Project Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOE/EIS-0370 (cooperating agency) Western's proposed action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line would be moved outside the area proposed for the reservoir, and Western would ensure the new location would allow the agency to continue to operate and maintain it. Section 2.4.1.4 of the Final Environmental Impact Statement, Volume 1 provides more information on the transmission line relocation proposal. The U.S. Department of the Interior, Bureau of Reclamation is the Lead Agency for the National Environmental Policy Act Review. Cooperating agencies are Western, the U.S. Army Corps of Engineers and Grand County, Colo.

170

MHK Projects | Open Energy Information  

Open Energy Info (EERE)

MHK Projects MHK Projects Jump to: navigation, search << Return to the MHK database homepage Click one of the following Marine Hydrokinetic Projects for more information: Loading... 40MW Lewis project ADM 3 ADM 4 ADM 5 AW Energy EMEC AWS II Admirality Inlet Tidal Energy Project Agucadoura Alaska 1 Alaska 13 Alaska 17 Alaska 18 Alaska 24 Alaska 25 Alaska 28 Alaska 31 Alaska 33 Alaska 35 Alaska 36 Alaska 7 Algiers Cutoff Project Algiers Light Project Amity Point Anconia Point Project Angoon Tidal Energy Plant Aquantis Project Ashley Point Project Astoria Tidal Energy Atchafalaya River Hydrokinetic Project II Avalon Tidal Avondale Bend Project BW2 Tidal Bar Field Bend Barfield Point Bayou Latenache Belair Project Belleville BioSTREAM Pilot Plant Bluemill Sound Bondurant Chute Bonnybrook Wastewater Facility Project 1

171

Umatilla River Subbasin Fish Habitat Improvement Project, 1990 Annual Report.  

DOE Green Energy (OSTI)

This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation of 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

Bailey, Timothy D.; Rimbach, Gregory P.

1991-03-01T23:59:59.000Z

172

Umatilla Basin Habitat Improvement Project; 1990 Annual Report.  

DOE Green Energy (OSTI)

This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the Funding source For the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. The major activities undertaken during this report period were: procurement of 6 cooperative lease agreements and one lease addendum with private landowners, design and layout of 4.4 miles of riparian exclosure fence and 1.75 miles of instream structures, development of three fencing contracts and three instream work contracts. Results include implementation OF 3 miles of fencing and 3.7 miles of instream work. Other activities undertaken during this report period are: weekly inspection and maintenance of fencing projects, collection and summarization of temperature data, photopoint establishment, coordination with numerous agencies and tribes and education of high school students on habitat improvement and preservation.

Bailey, Timothy D.; Rimbach, Gregory P. (Oregon Department of Fish and Wildlife)

1991-03-01T23:59:59.000Z

173

DOE/EIS-0285/SA-133: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Hanford-Ostrander [Mile 126/1-146/4] (3/20/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-133 Hanford-Ostrander [Mile 126/1-146/4] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. Location: The project location is within Skamania County, Washington. The project commences to the west of the White Salmon River and proceeds in a westerly directly for approximately 20 miles. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

174

End Point Implementation Examples | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Examples End Point Implementation Examples More Documents & Publications Post-Deactivation Surveillance and Maintenance Planning Project Management Plan Examples 1 - 80...

175

Compound and Elemental Analysis At Seven Mile Hole Area (Larson, Et Al.,  

Open Energy Info (EERE)

2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Compound and Elemental Analysis At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Compound and Elemental Analysis Activity Date Usefulness not indicated DOE-funding Unknown Notes Standard X-ray diffractometer (XRD) analyses were used in the laboratory to confirm the PIMA mineral identifications and to look for minerals that have poor SWIR response (e.g., quartz and feldspars) or were not present in great enough concentrations to be detected by the PIMA. Petrographic and electron microprobe analyses of selected samples were conducted in the laboratories of the GeoAnalytical Laboratory at Washington State

176

"Table 11. Fuel Economy, Selected Survey Years (Miles Per Gallon)"  

U.S. Energy Information Administration (EIA) Indexed Site

Fuel Economy, Selected Survey Years (Miles Per Gallon)" Fuel Economy, Selected Survey Years (Miles Per Gallon)" ,"Survey Years" ,1983,1985,1988,1991,1994,2001 "Total",15.1,16.1,18.3,19.3,19.8,20.2 "Household Characteristics" "Census Region and Division" " Northeast",15.6,"NA",19.6,20.9,20.7,20.85531 " New England",16.5,"NA",19.7,21.1,20.4,20.97907 " Middle Atlantic ",15.3,"NA",19.6,20.8,20.8,20.79659 " Midwest ",14.8,"NA",18.2,19,20.1,20.18362 " East North Central",14.9,"NA",18.4,19.4,20.1,20.26056 " West North Central ",14.5,"NA",17.8,17.9,20,20.01659 " South",15,"NA",18,19.2,19.6,20.17499 " South Atlantic",15.6,"NA",19,20.2,20.2,20.5718

177

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

178

Three Mile Island Plugged Tube Severance: A Study of Damage Mechanisms  

Science Conference Proceedings (OSTI)

During Fall 2001 outages, eddy-current inspections at Three Mile Island Unit 1 and Oconee Nuclear Station Unit 1 revealed wear scars on tubes surrounding previously plugged tubes. In both cases, investigations determined that the plugged tubes had severed and impacted neighboring tubes. As a result, the Nuclear Regulatory Commission (NRC) issued Information Notice 2002-02, which did not require a response but did suggest the industry investigate the generic problem of plugged tubes damaging neighboring t...

2003-05-19T23:59:59.000Z

179

Nondestructive techniques for assaying fuel debris in piping at Three Mile Island Unit 2  

SciTech Connect

Four major categories of nondestructive techniques - ultrasonic, passive gamma ray, infrared detection, and remote video examination - have been determined to be feasible for assaying fuel debris in the primary coolant system of the Three Mile Island Unit 2 (TMI-2) Reactor. Passive gamma ray detection is the most suitable technique for the TMI-2 piping; however, further development of this technique is needed for specific application to TMI-2.

Vinjamuri, K.; McIsaac, C.V.; Beller, L.S.; Isaacson, L.; Mandler, J.W.; Hobbins, R.R. Jr.

1981-11-01T23:59:59.000Z

180

Table 5.1. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption  

U.S. Energy Information Administration (EIA) Indexed Site

. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption . U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption and Expenditures, 1994 1993 Household and 1994 Vehicle Characteristics RSE Column Factor: Number of Vehicles Vehicle-Miles Traveled Motor Fuel Consumption Motor Fuel Expenditures RSE Row Factor: (million) (percent) (billion) (percent) (billion gallons) (gallon percent) (quadril- lion Btu) (billion dollars) (percent) 0.9 0.8 1.1 1.0 1.1 1.0 1.1 1.1 1.0 Household Characteristics Total .................................................... 156.8 100.0 1,793 100.0 90.6 100.0 11.2 104.7 100.0 2.8 Census Region and Division Northeast ........................................... 26.6 17.0 299 16.7 14.5 16.0 1.8 17.2 16.4 5.7 New England ................................... 7.6 4.8 84 4.7 4.1 4.5 0.5 4.8 4.6 13.8 Middle Atlantic

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Nuclear accident at Three Mile Island: its effect on a local community  

Science Conference Proceedings (OSTI)

This dissertation consists of a longitudinal case study of the extent to which the structure of community power in Riverside, (a pseudonym) Pennsylvania (the largest community located within five miles of the Three Mile Island nuclear facility) changed as a result of the March, 1979 accident. The investigation centers around testing a basic working hypothesis. Simply stated, this working hypothesis argues that Riverside's power structure has become more pluralistic in response to the Three Mile Island nuclear accident. An additional corollary to this working hypothesis is also tested. This corollary asserts that many of Riverside's community power actors have become much more cosmopolitan in their political-action tactics and problem-solving orientations as a results of the TMI crisis. The aforementioned working hypothesis and associated corollary are tested via the combined utilization of three different techniques for measuring the distribution of social power. The findings of the study clearly demonstrate the existence of increased pluralism, politicization, and cosmopolitanism within Riverside since March of 1979. Furthermore, these research results, and the entire dissertation itself, contribute to a number of subfields within the discipline of sociology. In particular,contributions are noted for the subfields of community power, social movements, and disaster research.

Behler, G.T. Jr.

1987-01-01T23:59:59.000Z

182

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safely shipped more than 600,000 cubic meters of radioactive waste - enough to fill a string of railcars 90 miles long The PMI Project of the Year is one of the world's most...

183

Property:Project Resource | Open Energy Information  

Open Energy Info (EERE)

Project Resource Project Resource Jump to: navigation, search Property Name Project Resource Property Type Text Pages using the property "Project Resource" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + Wave MHK Projects/ADM 3 + Wave MHK Projects/ADM 4 + Wave MHK Projects/ADM 5 + Wave MHK Projects/AWS II + Wave MHK Projects/Agucadoura + Wave MHK Projects/Alaska 13 + Current /Tidal MHK Projects/Alaska 35 + Current /Tidal MHK Projects/Algiers Light Project + Current /Tidal MHK Projects/Anconia Point Project + Current /Tidal MHK Projects/Ashley Point Project + Current /Tidal MHK Projects/Astoria Tidal Energy + Current /Tidal MHK Projects/Atchafalaya River Hydrokinetic Project II + Current /Tidal MHK Projects/Avalon Tidal + Current /Tidal

184

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

185

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT RWE SCHOTT SOLAR Energy Commission Prepared by: RWE Schott Solar, Inc #12; PREPARED BY: Primary Author(s): Miles C: California Energy Commission Hassan Mohammed Project Manager Linda Spiegel Office Manager Energy Generation

186

Foothills pipeline project prebuild being completed  

Science Conference Proceedings (OSTI)

September 1982 marked the completion of the 395-mile eastern leg of the Alaska Highway Gas Pipeline project; the western leg went into service in October 1981. The design capacities are, respectively, 1.075 billion and 240 million CF/day. Phase 11 of the project will consist of installing the northern, large-diameter sections in Alberta, British Columbia, the Yukon, and Alaska, along with additional facilities on the two completed legs.

Stewart, M.E.

1982-06-01T23:59:59.000Z

187

Compilation of Earthquakes from 1850-2007 within 200 miles of the Idaho National Laboratory  

SciTech Connect

An updated earthquake compilation was created for the years 1850 through 2007 within 200 miles of the Idaho National Laboratory. To generate this compilation, earthquake catalogs were collected from several contributing sources and searched for redundant events using the search criteria established for this effort. For all sets of duplicate events, a preferred event was selected, largely based on epicenter-network proximity. All unique magnitude information for each event was added to the preferred event records and these records were used to create the compilation referred to as INL1850-2007.

N. Seth Carpenter

2010-07-01T23:59:59.000Z

188

Data integrity review of Three Mile Island Unit 2. Hydrogen burn data. Volume 3  

DOE Green Energy (OSTI)

About 10 hours after the March 28, 1979 loss-of-coolant accident began at Three Mile Island Unit 2 (TMI-2), a hydrogen burn occurred inside the Reactor Building. This report reviews and presents data from 16 channels of resistance temperature detectors (RTDs), 2 steam generator pressure transmitters, 16 Reactor Building pressure switches, 2 channels of Reactor Building pressure measurements, and measurements of Reactor Building hydrogen, oxygen, and nitrogen concentrations with regard to their usefulness for determining the extent of the burn and the resulting pressure and temperature excursions inside the building.

Jacoby, J.K.; Nelson, R.A.; Nalezny, C.L.; Averill, R.H.

1983-09-01T23:59:59.000Z

189

Redeveloping or preserving public housing : the future of Columbia Point  

E-Print Network (OSTI)

Columbia Point, Boston's largest and most stigmatized public housing project, has been a focal point for public and private. investment strategies to create a new mixed-income residential community. Columbia Point provided ...

Lee, Sharon Hsueh-Jen

1981-01-01T23:59:59.000Z

190

White Creek Wind Power Project | Open Energy Information  

Open Energy Info (EERE)

White Creek Wind Power Project White Creek Wind Power Project Facility White Creek Wind Power Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Last Mile Electric Cooperative Developer Last Mile Electric Cooperative Energy Purchaser Last Mile Electric Cooperative Location Klickitat County Coordinates 45.853153°, -120.289578° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.853153,"lon":-120.289578,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

191

John Day River Sub-Basin Fish Habitat Enhancement Project; 2008 Annual Report  

DOE Green Energy (OSTI)

Work undertaken in 2008 included: (1) Seven new fence projects were completed thereby protecting approximately 10.97 miles of streams with 16.34 miles of riparian fence; (2) Renewal of one expired lease was completed thereby continuing to protect 0.75 miles of stream with 1.0 mile of riparian fence. (3) Maintenance of all active project fences (106.54 miles), watergaps (78), spring developments (33) were checked and repairs performed; (3) Planted 1000 willow/red osier on Fox Creek/Henslee property; (4) Planted 2000 willows/red osier on Middle Fork John Day River/Coleman property; (5) Planted 1000 willow/red osier cuttings on Fox Creek/Johns property; (6) Since the initiation of the Fish Habitat Project in 1984 we have 126.86 miles of stream protected using 211.72 miles of fence protecting 5658 acres. The purpose of the John Day Fish Habitat Enhancement Program is to enhance production of indigenous wild stocks of spring Chinook and summer steelhead within the sub basin through habitat protection, enhancement and fish passage improvement. The John Day River system supports the largest remaining wild runs of spring chinook salmon and summer steelhead in Northeast Oregon.

Powell, Russ M.; Alley, Pamela D.; Goin Jr, Lonnie [Oregon Department of Fish and Wildlife

2009-07-15T23:59:59.000Z

192

Microsoft PowerPoint - Entergy-Hydro-Operations_Smethers [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

Ouachita River System Ouachita River System LAKE OUACHITA CITY OF HOT SPRINGS LAKE CATHERINE Blakely Mountain Dam LAKE HAMITLON Carpenter Dam Remmel Dam 1 OUACHITA RIVER DeGray Lake & Dam Blakely Mtn. Dam/Lake Ouachita * Built in 1955 * forms Lake Ouachita * Owned & Operated by ACOE * 2 Units - 6600 CFS * 84 MW @178 ft. Head * AGC Capable Large volume of water * Large volume of water storage * Flood Control is a project purpose 2 project purpose Lake Hamilton / Lake Catherine * 6,897 acres surface * 198 miles shoreline * 1,642 acres surface * 56 miles shoreline * 198 miles shoreline * 70% shoreline developed * 50% of shoreline developed developed * 3,863 docks * 10 270 buildings * 399 docks * 1,391 buildings * 10,270 buildings within 500 ft. of shoreline , g within 500 ft. of shoreline 3 * Highly Developed * Highly Developed

193

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

194

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

195

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129) Ashe-Marion #2 [Mile 150-157]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129 Ashe-Marion #2 [Mile 150-157] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7 (reference line). The Buckley-Marion #1 transmission line is also present within the proposed corridor. Right of way width averages 135 feet. Location: The project location is within Wasco County, Oregon near the city of Pine Grove, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

196

Seven Mile Hill I & II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

I & II Wind Farm I & II Wind Farm Jump to: navigation, search Name Seven Mile Hill I & II Wind Farm Facility Seven Mile Hill I & II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner PacifiCorp Developer PacifiCorp Energy Purchaser PacifiCorp Location Between Hanna and Medicine Bow WY Coordinates 41.939079°, -106.372225° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.939079,"lon":-106.372225,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

197

Lessons Learned from Three Mile Island Packaging, Transportation and Disposition that Apply to Fukushima Daiichi Recovery  

SciTech Connect

Following the massive earthquake and resulting tsunami damage in March of 2011 at the Fukushima Daiichi nuclear power plant in Japan, interest was amplified for what was done for recovery at the Three Mile Island Unit 2 (TMI-2) in the United States following its meltdown in 1979. Many parallels could be drawn between to two accidents. This paper presents the results of research done into the TMI-2 recovery effort and its applicability to the Fukushima Daiichi cleanup. This research focused on three topics: packaging, transportation, and disposition. This research work was performed as a collaboration between Japans Central Research Institute of Electric Power Industry (CRIEPI) and the Idaho National Laboratory (INL). Hundreds of TMI-2 related documents were searched and pertinent information was gleaned from these documents. Other important information was also obtained by interviewing employees who were involved first hand in various aspects of the TMI-2 cleanup effort. This paper is organized into three main sections: (1) Transport from Three Mile Island to Central Facilities Area at INL, (2) Transport from INL Central Receiving Facility to INL Test Area North (TAN) and wet storage at TAN, and (3) Transport from TAN to INL Idaho Nuclear Technology and Engineering Center (INTEC) and Dry Storage at INTEC. Within each of these sections, lessons learned from performing recovery activities are presented and their applicability to the Fukushima Daiichi nuclear power plant cleanup are outlined.

Layne Pincock; Wendell Hintze; Dr. Koji Shirai

2012-07-01T23:59:59.000Z

198

Modal shifts in short-haul passenger travel and the consequent energy impacts. [Intercity travel under 500 miles  

SciTech Connect

A study was performed to evaluate the impacts of strategies to effect modal shifts in short-haul passenger travel (defined herein as intercity travel under 500 miles) from energy-intensive modes to those modes that are less energy-intensive. A series of individual strategies, ranging from incentives to the less energy-intensive modes (bus, rail) to penalties to the more energy-intensive modes (auto, air) was examined to determine energy saved and policy implications relative to strategy implementation. The most effective of the individual strategies were then combined in all permutations, and the analysis was repeated. As part of the analytical process, effects of factors other than energy (user cost and time, emissions, government subsidy, and travel fatailities) were examined in a benefit/cost analysis. Finally, energy savings, benefit/cost impacts, implementation considerations, and policy implications were evaluated to arrive at conclusions as to the effectiveness of the more-influential strategies and to the overall effectiveness of induced modal shifts. The principal conclusion of the study is that the maximum 1980 energy saving that might be realized by modal shifts, discounting the concurrent effects of demand suppression and improvement of mode efficiency, is approximately 83 x 10/sup 12/ Btu (46,500 bbl gasoline per day), 3.8% of the total projected 1980 energy consumption in the short-haul transportation sector and 0.23% of the total US petroleum use. It was also concluded that strategies to achieve these small savings by modal shifts would result in significant economic, social, and business disruptions.

Not Available

1980-03-01T23:59:59.000Z

199

DOE/EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

200

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup More Documents & Publications

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup More Documents & Publications

202

EIS-0474: Southline Transmission Project, Arizona and New Mexico |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Southline Transmission Project, Arizona and New Mexico 4: Southline Transmission Project, Arizona and New Mexico EIS-0474: Southline Transmission Project, Arizona and New Mexico Summary The Department of the Interior's Bureau of Land Management (BLM) and Department of Energy's Western Area Power Administration (Western) are preparing this EIS as joint lead agencies to evaluate the environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations. Project website: http://www.blm.gov/nm/southline.

203

Environmental Assessment of Proposed Lynch Creek Substation Project : Service to Eatonville and the Ohop Valley.  

SciTech Connect

Bonneville Power Administation (BPA) proposes to construct 3.2 miles of 115-kV transmission line from a tap point on Tacoma City Light's Cowlitz-LaGrande 115-kV line to a new 115/12.5-kV, 15/20/25 MVA substation to be located about 1 mile northwest of Eatonville, adjacent to the Eatonville cutoff road. This plan was selected following initial consideration of five alternative plans for satisfying electrical needs in the project area and following agreement with BPA's customers on a vicinity for the substation site. The vicinity selected is midway between the two load centers and would require the least construction of distribution line. Subsequently, four alternative line routes and two substation sites have been evaluated. These alternatives provide a range of costs, engineering solutions, and potential environmental impacts. This evaluation led to the selection of one line route. This document describes possible environmental impacts of the proposed actions. 7 refs, 9 figs., 5 tabs.

United States. Bonneville Power Administration.

1983-05-01T23:59:59.000Z

204

step toward the project's planned early 2011 startup. The project  

NLE Websites -- All DOE Office Websites (Extended Search)

step toward the project's planned early 2011 startup. The project step toward the project's planned early 2011 startup. The project will capture CO 2 from the Archer Daniels Midland (ADM) Ethanol Production Facility and inject it into a deep saline reservoir more than one mile underground. Beginning in early 2011, up to 1 million metric tons of the captured CO 2 will be compressed into a dense, liquid-like state and injected over a three-year period. The Mt. Simon Sandstone, which is the rock formation targeted for the injection, is the thickest and most widespread saline reservoir in the Illinois Basin, with an estimated CO 2 storage capacity as high as 110 billion metric tons. Analysis of the survey data is a key component in the comprehensive monitoring program that will be implemented to ensure the injected

205

Analysis of the Three Mile Island Unit 2 hydrogen burn. Volume 4  

DOE Green Energy (OSTI)

As a basis for the analysis of the hydrogen burn which occurred in the Three Mile Island Containment on March 28, 1979, a study of recorded temperatures and pressures was made. Long-term temperature information was obtained from the multipoint temperature recorder which shows 12 containment atmosphere temperatures plotted every 6 min. The containment atmosphere pressure recorder provided excellent long- and short-term pressure information. Short-term information was obtained from the multiplex record of 24 channels of data, recorded every 3 sec, and the alarm printer record which shows status change events and prints out temperatures, pressures, and the time of the events. The timing of these four data recording systems was correlated and pertinent data were tabulated, analyzed, and plotted to show average containment temperature and pressure versus time. Photographs and videotapes of the containment entries provided qualitative burn information.

Henrie, J.O.; Postma, A.K.

1983-03-01T23:59:59.000Z

206

Investigation of hydrogen-burn damage in the Three Mile Island Unit 2 reactor building  

DOE Green Energy (OSTI)

About 10 hours after the March 28, 1979 Loss-of-Coolant Accident began at Three Mile Island Unit 2, a hydrogen deflagration of undetermined extent occurred inside the reactor building. Examinations of photographic evidence, available from the first fifteen entries into the reactor building, yielded preliminary data on the possible extent and range of hydrogen burn damage. These data, although sparse, contributed to development of a possible damage path and to an estimate of the extent of damage to susceptible reactor building items. Further information gathered from analysis of additional photographs and samples can provide the means for estimating hydrogen source and production rate data crucial to developing a complete understanding of the TMI-2 hydrogen deflagration. 34 figures.

Alvares, N.J.; Beason, D.G.; Eidem, G.R.

1982-06-01T23:59:59.000Z

207

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 14, 2012 August 14, 2012 AIKEN, S.C. - American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Coun- ties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. "We excavated and disposed of over five million pounds of contaminated soil from three specific sites along the stream, erected miles of fence and placed over 2,000 signs in order to make Lower Three Runs safe and to reduce our site's footprint by another 10 percent," said Chris

208

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

209

Detroit Commuter Hydrogen Project  

Science Conference Proceedings (OSTI)

This project was undertaken to demonstrate the viability of using hydrogen as a fuel in an internal combustion engine vehicle for use as a part of a mass transit system. The advantages of hydrogen as a fuel include renew-ability, minimal environmental impact on air quality and the environment, and potential to reduce dependence on foreign energy sources for the transportation sector. Recognizing the potential for the hydrogen fuel concept, the Southeast Michigan Congress of Governments (SEMCOG) determined to consider it in the study of a proposed regional mass transit rail system for southeast Michigan. SEMCOG wanted to evaluate the feasibility of using hydrogen fueled internal combustion engine (H2ICE) vehicles in shuttle buses to connect the Detroit Metro Airport to a proposed, nearby rail station. Shuttle buses are in current use on the airport for passenger parking and inter-terminal transport. This duty cycle is well suited to the application of hydrogen fuel at this time because of the ability to re-fuel vehicles at a single nearby facility, overcoming the challenge of restricted fuel availability in the undeveloped hydrogen fuel infrastructure. A cooperative agreement between SEMCOG and the DOE was initiated and two H2ICE buses were placed in regular passenger service on March 29, 2009 and operated for six months in regular passenger service. The buses were developed and built by the Ford Motor Company. Wayne County Airport Authority provided the location for the demonstration with the airport transportation contractor, Metro Cars Inc. operating the buses. The buses were built on Ford E450 chassis and incorporated a modified a 6.8L V-10 engine with specially designed supercharger, fuel rails and injectors among other sophisticated control systems. Up to 30 kg of on-board gaseous hydrogen were stored in a modular six tank, 350 bar (5000 psi) system to provide a 150 mile driving range. The bus chassis and body were configured to carry nine passengers with luggage. By collecting fuel use data for the two H2ICE buses, with both written driver logs and onboard telemetry devices, and for two conventional propane-gasoline powered buses in the same service, comparisons of operating efficiency and maintenance requirements were completed. Public opinion about the concept of hydrogen fuel was sampled with a rider survey throughout the demonstration. The demonstration was very effective in adding to the understanding of the application of hydrogen as a transportation fuel. The two 9 passenger H2ICE buses accumulated nearly 50,000 miles and carried 14,285 passengers. Data indicated the H2ICE bus fuel economy to be 9.4 miles/ gallon of gasoline equivalent (m/GGE) compared to the 10 passenger propane-gasoline bus average of 9.8 m/GGE over 32,400 miles. The 23- passenger bus averaged 7.4 m/GGE over 40,700 miles. Rider feedback from 1050 on-board survey cards was overwhelmingly positive with 99.6% indicating they would ride again on a hydrogen powered vehicle. Minimal maintenance was required for theses buses during the demonstration project, but a longer duration demonstration would be required to more adequately assess this aspect of the concept.

Brooks, Jerry; Prebo, Brendan

2010-07-31T23:59:59.000Z

210

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Topic Group Summary Topic Group Summary Presented to: Transportation External Coordination Working Group Presented by: Presented by: Dan King, Oneida Nation, Tribal Topic Group Member Dan King, Oneida Nation, Tribal Topic Group Member April 5, 2005, Spring 2005 April 5, 2005, Spring 2005 Phoenix, AZ Phoenix, AZ 2 Funding Issues - Considerations * Examination of overlapping jurisdictions * Reconsider half-mile limit * Include all public safety officials in training * Ongoing training - turnover of personnel * Recovery of money spent responding to accidents * Cultural resources cannot be replaced - used to sustain communities 3 Funding Issues - Recommendations * Lessons Learned from Department of Homeland Security * Provide direct funding to Tribes * Create simple application process * Appoint Tribal representatives on application

211

End Points Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Management End Points Management The policy of the EM is that a formal project management approach be used for the planning, managing, and conducting of its projects. Specifying and achieving end points is a systematic, engineering way of proceeding from an existing condition to a stated desired final set of conditions in which the facility is safe and can be economically monitored and maintained. An end point method is a way to translate broad mission statements to explicit goals that are readily understood by engineers and craft personnel who do the work. (It should be recognized that while end points as addressed here are for a final set of conditions for deactivation, they may represent an interim point for the overall EM cleanup goal.) End Points Management

212

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

213

The Cleanup of Three Mile Island Unit 2, A Technical History: 1979 to 1990: A Technical History: 1979 to 1990  

Science Conference Proceedings (OSTI)

The fuel damage and the release of fission products after the Three Mile Island unit 2 (TMI-2) accident required unprecedented decisions regarding the enormous cleanup operations. The rationale for those decisions will provide valuable information for other managers who may face similar situations. Planning and response procedures can benefit from the insights gained from the TMI-2 accident.

1990-10-01T23:59:59.000Z

214

Analysis of soil and water at the Four Mile Creek seepline near the F- and H-Areas of SRS  

Science Conference Proceedings (OSTI)

Several soil and water samples were collected along the Four Mile Creek (FMC) seepline at the F and H Areas of the Savannah River Site. The samples were analyzed for concentrations of metals, radionuclides, and inorganic constituents. The results of the analyses are summarized for the soil and water samples.

Haselow, J.S.

2000-05-24T23:59:59.000Z

215

Three Mile Island-1, Crystal River-3, and Davis-Besse Fuel Crud Observations Assessment and Root Cause  

Science Conference Proceedings (OSTI)

This report shares information pertaining to elevated crud observed on fuel at Babcock Wilcox (BW) plants Crystal River-3, Davis-Besse, and Three Mile Island-1 and the subsequent causal investigation performed by AREVA, Inc. Discussion of industry operating experience, effects of crud, fuel inspection results, and preventive and corrective actions in future operating cycles are also included.

2011-10-26T23:59:59.000Z

216

Heatup of the TMI-2 (Three Mile Island Unit 2) lower head during core relocation  

SciTech Connect

According to current perceptions of the Three Mile Island Unit 2 (TMI-2) accident, corium largely relocated into the reactor vessel lower head at {approximately}224 min into the accident. Defueling examinations have revealed that the corium relocated from the molten core region to the lower head predominantly by way of drainage through the core former region (CFR) located between the vertical baffle plates immediately surrounding the fuel assemblies and the core barrel. An analysis has been carried out to assess the heatup of the reactor vessel lower head during the core relocation event, particularly the potential for a melting attack on the lower head wall and the in-core instrument nozzle penetration weldments. The analysis employed the THIRMAL computer code developed at Argonne National Laboratory (ANL) to predict the breakup and quenching or corium jets under film boiling conditions as well as the size distributions and quenching of the resultant molten droplets. The transient heatup and ablation of the vessel wall and penetration weldments due to impinging corium jets was calculated using the MISTI computer code.

Wang, S.K.; Sienicki, J.J.; Spencer, B.W. (Argonne National Laboratory, IL (USA))

1989-11-01T23:59:59.000Z

217

Timing of the Three Mile Island Unit 2 core degradation as determined by forensic engineering  

DOE Green Energy (OSTI)

Unlike computer simulation of an event, forensic engineering is the evaluation of recorded data and damaged as well as surviving components after an event to determine progressive causes of the event. Such an evaluation of the 1979 Three Mile Island Unit 2 accident indicates that gas began accumulating in steam, generator A at 6:10, or 130 min into the accident and, therefore, fuel cladding ruptures and/or zirconium-water reactions began at that time. Zirconium oxidation/hydrogen generation rates were highest ({approximately}70 kg of hydrogen per minute) during the core quench and collapse at 175 min. By 180 min, over 85% of the hydrogen generated by the zirconium-water reaction had been produced, and {approximately}400 kg of hydrogen had accumulated in the reactor coolant system. At that time, hydrogen concentrations at the steam/water interfaces in both steam generators approached 90%. By 203 min, the damaged reactor core had been reflooded and has not been uncovered since that time. Therefore, the core was completely under water at 225 min, when molten core material flowed into the lower head of the reactor vessel. 10 refs., 7 figs., 1 tab.

Henrie, J.O. (Hydrogen Control, Inc., Panguitch, UT (USA))

1988-01-01T23:59:59.000Z

218

Historical summary of the Three Mile Island Unit 2 core debris transportation campaign  

Science Conference Proceedings (OSTI)

Transport of the damaged core materials from the Unit 2 reactor of the Three Mile Island Nuclear Power Station (TMI-2) to the Idaho National Engineering Laboratory (INEL) for examination and storage presented many technical and institutional challenges, including assessing the ability to transport the damaged core; removing and packaging core debris in ways suitable for transport; developing a transport package that could both meet Federal regulations and interface with the facilities at TMI-2 and the INEL; and developing a transport plan, support logistics, and public communications channels suited to the task. This report is a historical summary of how the US Department of Energy addressed those challenges and transported, received, and stored the TMI-2 core debris at the INEL. Subjects discussed include preparations for transport, loading at TMI-2, institutional issues, transport operations, receipt and storage at the INEL, governmental inquiries/investigations, and lessons learned. Because of public attention focused on the TMI-2 Core Debris Transport Program, the exchange of information between the program and public was extensive. This exchange is a focus for parts of this report to explain why various operations were conducted as they were and why certain technical approaches were employed. And, because of that exchange, the program may have contributed to a better public understanding of such actions and may contribute to planning and execution of similar future actions.

Schmitt, R.C.; Tyacke, M.J. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Quinn, G.J. [Wastren, Inc., Germantown, MD (United States)

1993-03-01T23:59:59.000Z

219

Property:Project Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Installed Capacity (MW) Installed Capacity (MW) Jump to: navigation, search Property Name Project Installed Capacity (MW) Property Type String Pages using the property "Project Installed Capacity (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 0 + MHK Projects/ADM 5 + 1 + MHK Projects/AWS II + 1 + MHK Projects/Admirality Inlet Tidal Energy Project + 22 + MHK Projects/Agucadoura + 2 + MHK Projects/Alaska 18 + 10 + MHK Projects/Alaska 36 + 10 + MHK Projects/Algiers Cutoff Project + 16 + MHK Projects/Algiers Light Project + 0 + MHK Projects/Anconia Point Project + 0 + MHK Projects/Ashley Point Project + 0 + MHK Projects/Astoria Tidal Energy + 300 + MHK Projects/Avondale Bend Project + 0 + MHK Projects/Bar Field Bend + 0 +

220

Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.  

DOE Green Energy (OSTI)

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek, Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.

Hoverson, Eric D.; Amonette, Alexandra

2008-12-02T23:59:59.000Z

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ChargePoint America Vehicle Charging Infrastructure Summary Report  

NLE Websites -- All DOE Office Websites (Extended Search)

ChargePoint America Vehicle Charging Infrastructure Summary Report Project Status to Date through: March 2012 Number of Charging Units Charging Electricity Charging Unit -...

222

Reconstruction of 3D Points From Uncalibrated Underwater Video.  

E-Print Network (OSTI)

??This thesis presents a 3D reconstruction software pipeline that is capable of generating point cloud data from uncalibrated underwater video. This research project was undertaken (more)

Cavan, Neil

2011-01-01T23:59:59.000Z

223

Radiation effects on resins and zeolites at Three Mile Island Unit II  

DOE Green Energy (OSTI)

Radiation effects on resin and zeolite used in the waste cleanup at Three Mile Island Unit II have been examined both experimentally and in-situ. Hydrogen and organic gases are generated due to absorbed radiation as a function of resin material, curie loading and residual water content. Significant oxygen scavaging was demonstrated in the organic resin liners. Hydrogen and oxygen gases in near stoichiometric quantities are generated from irradiation of residual water in inorganic zeolites. Gas generation was determined to be directly proportional to curie content but correlates poorly with residual water content in zeolite vessels. Results of the gas generation analyses of EPICOR II liners show that vessels with less than 166 curies had almost no hydrogen generated during two years of storage and therefore did not require safety measures for shipment or storage. Experimental measurements done at research laboratories predicted similar results associated with hydrogen gas generation and oxygen depletion. X-ray diffraction examinations and ion exchange capacity measurements indicated no evidence of irradiation effects on the structure or cesium exchange capacity for zeolites exposed to 10/sup 10/ rads. Darkening and damage of organic resin due to radiation has been identified. Breaking and agglomeration of the purification demineralizer resin is believed to be the result of temperature effects. No damage was identified from radiation effects on zeolite. Organic and inorganic sorbents used in the processing of contaminated waters at TMI-2 have been shown to be effective in maintaining long-term stability under high radiation conditions. The effects of radiolytic degradation have been shown by direct measurements and simulation tests and are of use in their general application throughout the industry.

Reilly, J.K.; Grant, P.J.; Quinn, G.J.; Hofstetter, K.J.

1984-01-01T23:59:59.000Z

224

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

225

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of DOE's of DOE's National Recycling Policies Impacts on Portsmouth of Potential Changes to DOE Policies EM SSAB NATIONAL CHAIRS MEETING Deer Creek State Park, Mt. Sterling, Ohio November 5-7, 2013 Jeremy Harley, PE Subject Matter Expert, Portsmouth Gaseous Diffusion Plant EM SSAB NATIONAL CHAIRS MEETING Deer Creek State Park, Mt. Sterling, Ohio November 5-7, 2013 Potential for reuse? Towers Process Motors Transformers Switchgear Cable 1,740 motors 10,000 tons 190 miles 2,000 tons Mixed steel, copper, aluminum 50,000 tons 5,000+ tons Transformers 8,000 tons Potential For Recycle? EM SSAB NATIONAL CHAIRS MEETING Deer Creek State Park, Mt. Sterling, Ohio November 5-7, 2013 Structural Steel 225,000 tons Potential For Recycle? EM SSAB NATIONAL CHAIRS MEETING

226

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISO New England Comments on the ISO New England Comments on the National Electric Transmission Congestion Study Department of Energy Workshop Philadelphia, PA December 6, 2011 Michael I. Henderson Director Regional Planning and Coordination, System Planning DOE Workshop - December 6, 2011 © 2011 ISO New England Inc. Key Facts About New England's Electric Power System and Wholesale Electricity Markets 2 6.5 million households and businesses; population 14 million Over 300 generators totaling 32,000 MW of capacity Over 8,000 miles of transmission lines 13 interconnections to electricity systems in New York and Canada 2,035 MW of demand-resources All-time peak demand of 28,130 MW, set on August 2, 2006 More than 450 participants in the marketplace (those who generate, buy, sell, transport, and use wholesale

227

Thailand gas project now operational  

SciTech Connect

Now operational, Phase 1 of Thailand's first major natural gas system comprises one of the world's longest (264 miles) offshore gas lines. Built for the Petroleum Authority of Thailand (PTT), this system delivers gas from the Erawan field in the Gulf of Thailand to two electrical power plants near Bangkok, operated by the Electricity Generating Authority of Thailand (EGAT). The project required laying about 360 miles of pipeline, 34-in., 0.625 in.-thick API-5LX-60 pipe offshore and 28-in., 0.406 in.-thick API-5LX-60 onshore. The offshore pipe received a coal-tar coating, a 3.5-5.0 in. concrete coating, and zinc sacrificial-anode bracelets. The onshore line was coated with the same coal-tar enamel and, where necessary, with concrete up to 4.5 in. thick. Because EGAT's two power plants are the system's only customers, no more pipeline will be constructed until deliveries, currently averaging about 100 million CF/day, reach the 250 million CF/day level. The project's second phase will include additional pipelines as well as an onshore distribution network to industrial customers.

Horner, C.

1982-08-01T23:59:59.000Z

228

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Chart: project timeline - Project Milestones - Budget - Bibliography * Thank you 29 30 Organization Chart * Project team: Purdue University - Dr. Brenda B. Bowen: PI, student...

229

DOE Hydrogen and Fuel Cells Program Record 5038: Hydrogen Cost Competitive on a Cents per Mile Basis - 2006  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Date: May 22, 2006 8 Date: May 22, 2006 Title: Hydrogen Cost Competitive on a Cents per Mile Basis - 2006 Originator: Patrick Davis & Steve Chalk Approved by: JoAnn Milliken Approval Date: May 22, 2006 Item : Lower the cost of hydrogen from natural gas to be competitive on a cents per mile basis with conventional gasoline vehicles. Supporting Information: The results of a 2003 economic analysis were used to estimate the cost of hydrogen produced from distributed natural gas reforming at $5 per gallon of gasoline equivalent (gge) (See U.S. DOE Record 5030: Hydrogen Baseline Cost of $5 per gge in 2003; available at http://www.hydrogen.energy.gov/program_records). Since the original analysis, DOE-sponsored R&D has resulted in significant cost reductions,

230

Searchlight Wind Energy Project FEIS Appendix A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Public Hearing Materials 3: Public Hearing Materials Draft Environmental Impact Statement Public Meetings February 21 - 23, 2012 * An approximately 200 megawatt wind energy facility and associated infrastructure proposed by Searchlight Wind Energy, LLC * Project will produce electricity to power approximately 50,000 homes. * An interconnection switching station proposed by Western Area Power Administration 2 3 The proposed project area is adjacent to Searchlight, approximately 60 miles southeast of Las Vegas in Clark County, Nevada Right-of-way application area (shown in red) is the same as the area of mineral segregation at approximately 18,000 acres If approved, the permanent

231

Methodology for Estimating ton-Miles of Goods Movements for U.S. Freight Mulitimodal Network System  

SciTech Connect

Ton-miles is a commonly used measure of freight transportation output. Estimation of ton-miles in the U.S. transportation system requires freight flow data at disaggregated level (either by link flow, path flows or origin-destination flows between small geographic areas). However, the sheer magnitude of the freight data system as well as industrial confidentiality concerns in Census survey, limit the freight data which is made available to the public. Through the years, the Center for Transportation Analysis (CTA) of the Oak Ridge National Laboratory (ORNL) has been working in the development of comprehensive national and regional freight databases and network flow models. One of the main products of this effort is the Freight Analysis Framework (FAF), a public database released by the ORNL. FAF provides to the general public a multidimensional matrix of freight flows (weight and dollar value) on the U.S. transportation system between states, major metropolitan areas, and remainder of states. Recently, the CTA research team has developed a methodology to estimate ton-miles by mode of transportation between the 2007 FAF regions. This paper describes the data disaggregation methodology. The method relies on the estimation of disaggregation factors that are related to measures of production, attractiveness and average shipments distances by mode service. Production and attractiveness of counties are captured by the total employment payroll. Likely mileages for shipments between counties are calculated by using a geographic database, i.e. the CTA multimodal network system. Results of validation experiments demonstrate the validity of the method. Moreover, 2007 FAF ton-miles estimates are consistent with the major freight data programs for rail and water movements.

Oliveira Neto, Francisco Moraes [ORNL; Chin, Shih-Miao [ORNL; Hwang, Ho-Ling [ORNL

2013-01-01T23:59:59.000Z

232

Appendix B - Control Points  

NLE Websites -- All DOE Office Websites (Extended Search)

B B Control Points B.1 Injector Control Points Qty Type Device 2 Magnet Bend magnet - DL1 bend 9 Magnet Quad magnet 10 Magnet X-Y Corrector Pair 2 Magnet Solenoid 2 Magnet...

233

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

resolved Power capture and conversion in line with prediction 11 CF16539GG 1 OCEAN POWER DELIVERY LTD PROJECTS 12 CF16539GG 1 Enersis - Project 1 Enersis Portugal's largest...

234

Material management: experience on the Alaska North Slope Project. [Kuparuk River Project  

SciTech Connect

The Kuparuk River Unit Project started in 1978, with the first major production facility sea lifted to the construction site on the North Slope of Alaska in the summer of 1981. The oil production field is located approximately 25 miles west of the Prudhoe Bay facility and 250 miles north of the Arctic Circle. The size of the Kuparuk site is 215 square miles, overlaying a projected recoverable reservoir of 1.2 billion barrels of oil. The present plan calls for approximately 50 drillsite pads, with the possibility of up to 32 wells on each pad. Modular construction was the most cost-effective method to use. The need for intensive material management on the Kuparuk River Unit Project became evident as the scope of engineering effort increased, shortening the amount of time available for acquisition of purchased materials and for the construction of the modules to meet the annual six-week sea-lift delivery period. The logistics of the Kuparuk construction site, the timeframe required to do the modular construction, the support facilities necessary, and several contractors and types of contracts, required Stearns Catalytic Corporation to consider a sophisticated material control system to identify the various areas of concern. The computerized system set up to solve the problems is discussed here generically.

Humphreys, R.B.

1985-08-01T23:59:59.000Z

235

Microsoft PowerPoint - Proceedings Cover Sheets  

NLE Websites -- All DOE Office Websites (Extended Search)

Kentucky Illinois Basin outline 0 30 60 15 Miles Glacial deposits Limestone Sandstone Shale Dolomite Precambrian granite and ryolite Enhanced Oil Recovery Enhanced oil recovery...

236

Project311  

NLE Websites -- All DOE Office Websites (Extended Search)

Lang Lang Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4881 david.lang@netl.doe.gov John Bowser Principal Investigator Compact Membrane Systems, Inc. 325 Water Street Wilmington, DE 19804 302-999-7996 john.bowser@compactmembrane.com Sequestration CARBON DIOXIDE CAPTURE FROM LARGE POINT SOURCES Background Capture of carbon dioxide at the source of its emission has been a major focus in greenhouse gas emission control. Current technologies used for capturing CO 2 suffer from inefficient mass transfer and economics. In Phase I, Compact Membrane Systems, Inc. will fabricate and test a membrane-based absorption system for the removal of carbon dioxide from a simulated power-plant flue gas. The stability of the membrane system under various operating conditions

237

Semantic point detector  

Science Conference Proceedings (OSTI)

Local features are the building blocks of many visual systems, and local point detector is usually the first component for local feature extraction. Existing local point detector are designed with target for matching and it may not perform well when ... Keywords: semantic point detector

Kuiyuan Yang; Lei Zhang; Meng Wang; Hong-Jiang Zhang

2011-11-01T23:59:59.000Z

238

Active NEPA Projects | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Active NEPA Projects Active NEPA Projects Active NEPA Projects List of Active NEPA Projects EIS-0497: CE FLNG Project, Plaquemines Parish, Louisiana The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal in Plaquemines Parish, Louisiana, and approximately 37 miles of 42-inch diameter natural gas transmission pipeline to connect the terminal to natural gas infrastructure facilities. Last Update: January 8, 2014 EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Milton-Freewater, Oregon, and Dayton, Washington Bonneville Power Administration (BPA) is preparing an EIS to analyze the potential environmental impacts of funding a proposal by the Confederated

239

Thailand natural-gas project moves ahead  

SciTech Connect

The longest offshore pipeline currently under construction in the world is the 264-mile 34-in. submarine transmission line connecting Union Oil's natural gas production platform in the Gulf of Thailand to the 99-mile 28-in. onshore pipeline being laid from the landfall point to Bangkok. The entire facility will be operating by Sept. 15, 1981. Custody of the gas will be transferred to the Petroleum Authority of Thailand (PTT) at the platform; the gas will pass through a dewpoint-control unit at the shoreline near Rayong and to a mainline pressure-regulation and odor-injection station before it is delivered to the Electricity Generation Authority of Thailand (EGAT) at two power plants, Bang Pakong and South Bangkok.

Knapp-Fisher, R.N.; Paritpokee, S.

1981-02-09T23:59:59.000Z

240

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA - 128 - Olympia-Satsop #3 [Mile1-6]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2003 6, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 128 - Olympia-Satsop #3 [Mile 1-6] James Jellison Natural Resource Specialist - TFO/Olympia Proposed Action: Vegetation Management for the Olympia-Satsop #3 230 kV transmission line corridor (reference line) from structure 1/1 through structure 6/1 and between structures 8/3 and 8/4. Other lines which are present in the proposed corridor are the Paul-Satsop #1 500 kV, Olympia-Satsop #2 500 kV, Olympia-South Elma #1 115 kV, Olympia-Kitsap #3 230 kV, Olympia-Shelton #3 230 kV, Olympia-Shelton #4 230 kV, and Olympia-Shelton #1 115 kV. Right of way width averages 615 feet. Location: The project location is within Thurston County, Washington and is within the

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Final report for the Advanced Natural Gas Vehicle Project  

DOE Green Energy (OSTI)

The project objective was to develop the technologies necessary to prototype a dedicated compressed natural gas (CNG) powered, mid-size automobile with operational capabilities comparable to gasoline automobiles. A system approach was used to design and develop the engine, gas storage system and vehicle packaging. The 2.4-liter DOHC engine was optimized for natural gas operation with high-compression pistons, hardened exhaust valves, a methane-specific catalytic converter and multi-point gaseous injection. The chassis was repackaging to increase space for fuel storage with a custom-designed, cast-aluminum, semi-trailing arm rear suspension system, a revised flat trunk sheet-metal floorpan and by equipping the car with run-flat tires. An Integrated Storage system (ISS) was developed using all-composite, small-diameter cylinders encapsulated within a high-strength fiberglass shell with impact-absorbing foam. The prototypes achieved the target goals of a city/highway driving range of 300 miles, ample trunk capacity, gasoline vehicle performance and ultra low exhaust emissions.

John Wozniak

1999-02-16T23:59:59.000Z

242

Projecting Fatalities in Crashes Involving Older Drivers, 2000-2025  

Science Conference Proceedings (OSTI)

As part of this research effort, we developed a new methodology for projecting elderly traffic crash fatalities. This methodology separates exposure to crashes from crash risk per se, and further divides exposure into two components, the number of miles driven and the likelihood of being a driver. This component structure permits conceptually different determinants of traffic fatalities to be projected separately and has thorough motivation in behavioral theory. It also permits finer targeting of particular aspects of projections that need improvement and closer linking of projections to possible policy instruments for influencing them.

Hu, P.S.

2001-03-23T23:59:59.000Z

243

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects Projects Characterization of Most Promising Carbon Capture and Sequestration Formations in the Central Rocky Mountain Region (RMCCS) RCSP Annual Review Meeting October 5-7, 2010 Pittsburgh, PA Acknowledgements I * Many thanks to the U.S. Department of Energy and NETL for supporting this project * We express our gratitude also to our many industry partners, who have committed a great deal of time, funding and other general support for this project * The work presented today is co-authored by many partners in the RMCCS project * Project Team (Who) * Major Goals (Why) * Work Plan (How) * Progress to Date (What) Presentation Outline Partners The project team consists of the geological surveys in each state of the region, some invaluable industry partners, and of course NETL.

244

Preliminary technical data report: WyCoalGas project water system. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming  

SciTech Connect

The WyCoalGas, Inc. Proposed coal gasification plant site is approximately 16 miles north of Douglas, Wyoming, located generally in Sections 27 and 34, T35N, R70W of the sixth prinicpal meridian. The plant site is located in typical high plateau plains of central Wyoming. Climate in the area is typical of semi-arid central Wyoming and is subject to wide variations in temperature. Precipitation in the area averages about 14 inches per year, of which about 10 inches fall during the April-September irrigation season. Projected water requirements at the plant site are 6020 acre-feet per year. Since the proposed plant site is not near any major streams or rivers, water must be transported to it. Water will be supplied from four sources - two surface water and two groundwater. The two surface water sources are LaPrele Reservoir and flood flows from the North Platte River with a 1974 appropriations date. LaPrele Reservoir is located approximately 14 miles west of Douglas, Wyoming, and is shown on Figure A-1. Water will be released from LaPrele Reservoir and flow down LaPrele Creek to the North Platte River. Water from the North Platte River will be diverted at a point in Section 7 of T33N, R71W. The LaPrele water and excess water from the North Platte will be pumped from the river and stored in Panhandle Reservoir No. 1, which is also referred to as Combs Reservoir. A pipeline will convey water from Panhandle Reservoir No. 1 to the coal gasification plant site. The two groundwater sources are located north of Douglas and west of Douglas.

1982-01-01T23:59:59.000Z

245

Grande Ronde Model Watershed Project; Dark Canyon Riparian Exclosure, Completion Report 2002.  

DOE Green Energy (OSTI)

The Baker Field Office, Vale District Bureau of Land Management (BLM) submitted a project proposal for funding in 2002 through the Grande Ronde Model Watershed Program (GRMWP). The project consisted of constructing two riparian exclosures to prevent livestock grazing in the riparian areas of Dark Canyon and Meadow Creek. The BLM completed the NEPA documentation and supplied the fencing materials. Funding from BPA through the GRMWP was used to complete the construction of the two exclosures. This project was completed in the fall of 2002. The project area is located in Union County, Oregon on BLM managed land adjacent to Dark Canyon and Meadow Creek, T. 3. S., R. 35 E., Section 24 and 25. Section 24 is along Dark Canyon Creek and section 25 is along Meadow Creek. Approximately 0.4 miles of stream would be protected from grazing with the construction of the two exclosures. A two person crew was hired to construct a four-strand barbed wire fence. The fence enclosed the riparian area on both sides of each creek so that no grazing would occur within the riparian area on BLM managed land. Total fence length is approximately 1.25 miles. Materials consisted of metal fence posts, barbed wire, rockjacks, fence stays, and 2 x 4's. The fence was constructed in the fall of 2002. The riparian area is effectively excluded from livestock grazing at this time. The construction of the exclosures should enhance riparian vegetation, increase bank stability, and improve riparian and in-stream habitat by exclusion of livestock in the riparian areas. Monitoring will ensure that the exclosures continues to be effective. Annual monitoring will include photo-points and compliance checks during the grazing season by BLM personnel. The BLM will submit a monitoring report, which includes the results of the annual monitoring, to the GRMWP in years 2005 and 2007. The exclosures do cross the creeks so maintenance may be needed on occasion, especially after high flow events in the creeks. Material such as logs which are mobilized during high stream flows may damage the exclosures requiring maintenance to keep cattle from grazing in the riparian areas. The BLM spent approximately $4,000 on fencing materials and $1,375 on NEPA compliance. In addition, the estimated cost of the monitoring over five years is expected to be approximately $1,600. The $5,050 that the BLM received from the BPA for the project was used to hire two temporary employees to construct the exclosures.

Kuck, Todd

2003-03-01T23:59:59.000Z

246

End Points Specification Methods | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

End Points Specification Methods End Points Specification Methods End Points Specification Methods Two methods to develop end point specifications are presented. These have evolved from use in the field for deactivation projects. The hierarchical method is systematic, comprehensive, and completely defensible as to the basis for each specification. This method may appear complex to the uninitiated, but it is a straightforward application of a systematic engineering approach. It is labor intensive only during the final stage. This method is appropriate to the type of project involving a complex facility that contains process systems and a variety of contaminated areas or other hazards. The checklist method is an approach that is more appropriate to facilities which require less detailed planning, such as for industrial

247

Tucson aqueduct phase A, a feature of central Arizona project  

Science Conference Proceedings (OSTI)

Construction and operation of 40 miles of aqueduct from the terminus of the Salt-Gila Aqueduct in southcentral Pinal County to the vicinity of Rillito in northern Pima County, Arizona are proposed. The project, which would constitute Phase A of the Tuscon Aqueduct Project would involve three pumping plants; 40 miles of open, concrete-lined canal; two miles of discharge pipeline; and 29 miles of 115-kilovolt overhead transmission line. Approximately 185,000 acres of farmland in Pinal and Pima counties could receive water via Phase A of the Tuscon Aqueduct. As a result, the amount of water pumped from the groundwater aquifer in this area would decrease. Lowering of the aquifer level that results in increased pumping costs and damaging land subsidence would be mitigated by importation of water via the aqueduct.Rights-of-way requirements would displace pecan orchards, desert grazing land, and wildlife habitat, and the canal would obstruct wildlife movements and would constitute a drowning hazard for wildlife. Structures and rock cuts would mar visual aesthetics. Historic and prehistoric archaeological sites would be affected. The aqueduct would interfere with some small surfacewater drainages and water would be lost due to evaporation. Recreational access to the west side of the Picacho Mountains would be hampered somewhat.

Not Available

1982-09-01T23:59:59.000Z

248

Citrus County Extension Office From I-75, take Exit # 329 (old # 66), SR 44 and go West on SR 44 toward Inverness/Crystal River (approx. 17 miles). Follow SR 44  

E-Print Network (OSTI)

on SR 44 toward Inverness/Crystal River (approx. 17 miles). Follow SR 44 through Inverness to traffic

Watson, Craig A.

249

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Webbers Falls Major Rehab Webbers Falls Major Rehab Webbers Falls Major Rehab BUILDING STRONG ® 6/8/2010 2 Plant Cross Section Plant Cross Section BUILDING STRONG ® Project Cost and Scope Project Cost and Scope *Current Cost: $72.7M *Current Completion Date: Jun 2012 *Rehab 2 Bridge Cranes *Rehab 2 Gantry Cranes *Rewind 3 Generators *Install New 13.8KV Breakers and Buss *Repair Misc Mechanical & Electrical Items BUILDING STRONG ® Project Funding Project Funding *Project was 100% funded through customer funding until FY09 ARRA funds were received. ARRA funds now being used for, gantry cranes, breakers, cables and distribution panels. *To date customer funds in the amount of $67.9M have been provided for this project. BUILDING STRONG ® Total Cost Breakdown Total Cost Breakdown

250

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Detailed End Points - Development of Detailed End Points - End Point Document Examples Example 28 7.0 ENDPOINTS Chapter 7.0 describes the endpoint development principles and methodology, administration, closure, and turnover package for the 324 and 327 Buildings Stabilization/Deactivation Project. 7.1 Background The endpoint method for the 324 and 327 Buildings Stabilization/Deactivation Project will follow the EM-60 guidance, published in DOE/EM-0318, Rev. 0, U.S. Department of Energy, Office of Environmental Management Facility Deactivation, Methods and Practice Handbook, Emphasizing End Points (sic) Implementation . The methods of defining endpoints for facility stabilization and deactivation were proven extremely effective at the PUREX and B-Plant facilities for planning work and interacting with the

251

PowerPoint Presentation  

National Nuclear Security Administration (NNSA)

y x Main crack surface Dislocation loops Crack initiation point Crack branching (BLJ + thermal motion) Crack embryo 3D view of surface particles Developed crack Crack development...

252

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

37, p.325, 2012 17 Advanced Manufacturing 18 Permanent magnets and batteries o Molten salt electrolysis process * Use Mg to reduce the melting points of heavy rare...

253

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Rod Shank- SWT Project Manager Rod Shank- SWT Project Manager Joe Lapeyre- HDC Product Coordinator 12 June 2013 SWPA Engineering Analysis Program Turbine Replacement and Generator Rewind BUILDING STRONG ® * Total Analysis Budget for 5 plants- $2,358,000 * Bull Shoals- $455,000 * Norfork- $504,000 * Table Rock- $504,000 * Keystone- $391,000 * Kerr- $504,000 Turbine And Generator Engineering Analysis Budget Cost Summary BUILDING STRONG ® Each plant analysis will include- * Turbine And Generator Condition Assessment * Turbine Performance Testing as needed * Generator Uprate Limit Analysis * Development of Feasible Replacement Alternatives * Economic Analysis of Alternatives * Development of Project Budget Costs * Project Priority Ranking

254

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1974 Products, Systems and Services Divisions Hundreds of Projects around the World HQ and Manufacturing in Vermont Regional offices in NY, TX, CA, England, and...

255

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

IOGCCSSEB PTTF REPORT THE PIPELINE PROJECT: Analysis of potential pipeline infrastructure, transportation & storage of CO 2 Presented at DOE's Carbon Storage Program...

256

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

North America Business Manager Aug 21-23, 2012 Carbon Storage R&D Project Review Meeting Developing the Technologies Co-authors Collaborators Robert Butsch, Schlumberger...

257

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* Product penalties * Success stories * Projects for individuals * Educational material * Energy incentives * NEPA calls to action * Social Media shareables * ContestsChallenge s...

258

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

others in the longer term. * Services - Project-centric data formatsmodels. - Indexquery capability. - Community-centric data caches. 11 Analysis * Resources: Deploy "common...

259

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Network National Laboratory Gene Library Project GenBank TB Structural Genomics Consortium Bioforensics Analysis Research and Development Center Immunological...

260

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paducah Project Office (PPPO) has partnered with state universities in Kentucky (University of Kentucky) and Ohio (Ohio University) to assist in the public engagement...

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Gary T. Rochelle (PI) & Eric Chen The University of Texas at Austin Katherine Dombrowski (PM), URS Andrew Sexton (TE), Trimeric Bruce Lani, DOE PM 1 Outline * Project...

262

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Science & Technology May 30 th , 2008 Enabling Sustainable Development of Fossil Fuel Energy Conversion Systems: Carbon Mineral Sequestration Projected Global Energy Demand...

263

Cove Point: A step back into the LNG business  

Science Conference Proceedings (OSTI)

In 1978, ships began unloading LNG from Algeria at Cove Point`s berthing facilities 1.25 miles offshore. An underwater pipeline transported the LNG to land, where it was stored in the terminal`s four 140-foot-high cryogenic storage tanks. When the LNG was needed, the terminals 10 vaporizers converted it back to gas for send out via an 87-mile-long, 36-inch-diameter pipeline linking the terminal with interstate pipelines of CNG Transmission Corp. and Columbia Gas Transmission Corp. in Loudon County, Va. But Cove Point handled only about 80 shiploads of LNG before shutting down in December 1980, after a dispute about gas prices between US customers and Algeria. The plant sat dormant until the natural gas industry`s deregulation under Order 636. Deregulation resulted in major pipelines abandoning their sales service, and gas distributors and large customers found it was now their obligation to ensure that they had adequate gas supplies during winter peak-demand periods. Enter Cove Point`s peaking capabilities. They had to add the liquefaction unit and recommission other parts of the plant, but the timing was right. Cove Point`s new liquefaction unit is liquefying about 15 million cubic feet (MMcf) of LNG per day of domestic gas. It chills the gas to {minus}260 degrees Fahrenheit to turn it into a liquid for injection and storage in one of the facility`s double-walled insulated tanks. During its initial injection season, which ends Dec. 15, Cove Point is expected to produce enough LNG to almost fill one tank, which can store up to 1.25 billion cubic feet (Bcf). Were the gas not intended for peak-shaving purposes, it would be enough to supply 14,000 homes for a year. As it is, most of the gas will be returned as pipeline gas, during next January and February`s expected cold snaps, to the utilities and users who supplied it. Cove Point`s initial daily sendout capacity is about 400 MMcf.

Katz, M.G.

1995-12-31T23:59:59.000Z

264

Analysis of air-temperature measurements from the Three Mile Island Unit 2 reactor building  

DOE Green Energy (OSTI)

The performance of the ambient air resistance temperature detectors (RTDs) just after the hydrogen burn in the TMI-2 Reactor Building is examined. The performance of the sensors is compared with physical models of the sensor/ambient air system. With one exception, the RTD data appear to be valid for the period examined. Based on the data, the hydrogen burn ended considerably before the first data points were recorded.

Fryer, M.O.

1983-04-01T23:59:59.000Z

265

PowerPoint Presentation  

U.S. Energy Information Administration (EIA) Indexed Site

William Gausman William Gausman Sr. Vice President Asset Management & Planning DOE Energy Information Administration Washington, DC April 7, 2010 PHI's Smart Grid Vision and Investment Grant Awards 1 Presentation Overview * PHI Company overview * PHI's Smart Grid Vision * SGIG Awards - Scope, Costs, Benefits and Schedules * Distribution Automation * Key Next Steps 2 Combined Service Territory Transmission & Distribution Competitive Energy / Other Who is Pepco Holdings, Inc. PHI Investments 2 Regulated transmission and distribution is PHI's core business. 3 Business Overview Gas Customers ►778,000 ►498,000 ►123,000 ►547,000 GWh ►26,549 ►12,494 ► N/A ►9,659 Mcf (000's) ► N/A ► N/A ►19,044 ► N/A Service Area ►640 ►5,000 ►275 ►2,700 (square miles)

266

Microsoft PowerPoint - News Flash_FINAL_073009_vvb  

NLE Websites -- All DOE Office Websites (Extended Search)

July 30, 2009 July 30, 2009 Moab Steps Up the Pace of Mill Tailings Shipments U.S. Department of Energy For more information on EM Recovery Act, visit: www.em.doe.gov/emrecovery Recovery Act funds ($108 million) are being used to accelerate the frequency of uranium mill tailings shipments from the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project site to a disposal site near Crescent Junction, Utah. Mill tailings are a byproduct of uranium mining and processing. Located northwest of Moab in Grand County, Utah, and on the west bank of the Colorado River, the Moab UMTRA Project includes the former Atlas uranium mill site that ceased operations in 1984. About 130 acres of the site is covered by a 16-million-ton uranium mill tailings pile. The mill tailings are being moved by train to the disposal site 30 miles away,

267

Point-Based Graphics  

Science Conference Proceedings (OSTI)

The polygon-mesh approach to 3D modeling was a huge advance, but today its limitations are clear. Longer render times for increasingly complex images effectively cap image complexity, or else stretch budgets and schedules to the breaking point. Point-based ... Keywords: Computer Graphics, Computers

Markus Gross; Hanspeter Pfister

2007-06-01T23:59:59.000Z

268

Sklyanin algebras and Hilbert schemes of points  

E-Print Network (OSTI)

We construct projective moduli spaces for torsion-free sheaves on noncommutative projective planes. These moduli spaces vary smoothly in the parameters describing the noncommutative plane and have good properties analogous to those of moduli spaces of sheaves over the usual (commutative) projective plane P^2. The generic noncommutative plane corresponds to the Sklyanin algebra S constructed from an automorphism sigma of infinite order on an elliptic curve E < P^2. In this case, the fine moduli space of line bundles over S with first Chern class zero and Euler characteristic (1-n) provides a symplectic variety that is a deformation of the Hilbert scheme of n points on P^2 - E.

T. A. Nevins; J. T. Stafford

2003-10-03T23:59:59.000Z

269

Review of Destructive Assay Methods for Nuclear Materials Characterization from the Three Mile Island (TMI) Fuel Debris  

SciTech Connect

This report provides a summary of the literature review that was performed and based on previous work performed at the Idaho National Laboratory studying the Three Mile Island 2 (TMI-2) nuclear reactor accident, specifically the melted fuel debris. The purpose of the literature review was to document prior published work that supports the feasibility of the analytical techniques that were developed to provide quantitative results of the make-up of the fuel and reactor component debris located inside and outside the containment. The quantitative analysis provides a technique to perform nuclear fuel accountancy measurements

Carla J. Miller

2013-09-01T23:59:59.000Z

270

Project Accounts  

NLE Websites -- All DOE Office Websites (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

271

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Questions Associated with Questions Associated with Free Flow Axial Turbines Jim Gibson Devine Tarbell & Associates, Inc. October 27, 2005 2 Roosevelt Island Tidal Energy Project * Verdant Power's RITE Project * Proceeding Through Stage II Licensing Activities * Permits Required (obtained) to Perform Studies * New York State Section 401 / Excavation and Fill * Department of State Coastal Consistency Review * New York SEQR and Federal NEPA Reviews * Army Corps Section 404 and Section 10 Permits * Four Public Notices (for temporary pilot project) * Numerous Agency and Stakeholder Meetings 3 Project Location 4 Project Location 5 6 7 "Six-Pack" Under Water 8 Comments Received From * New York State Department of Environmental Conservation * US Fish and Wildlife Service * NOAA Fisheries (NMFS) * US Coast Guard

272

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Combined Pressure and Temperature Contrast and Combined Pressure and Temperature Contrast and Surface-enhanced Separation of Carbon-dioxide for Post-combustion Carbon Capture Dr. Michael S. Wong Professor in Chemical and Biomolecular Engineering, Chemistry and Environmental Engineering Rice University NETL CO 2 Capture Technology Meeting July 10 th , 2013 DOE Project # DE0007531 Project Manager: Ms. Elaine Everitt Outline * About Rice University * Project Overview * Project Team * Combined Pressure and Temperature Contrast and Surface- enhanced Separation of Carbon-dioxide * Selection of materials * Integrated absorber and stripper - A proof-of-concept demonstration * Substrate functionalization * Project Budget 2 * Located in Houston, TX * 295-acre, heavily wooded campus * Ranked 17 th in the US and in the

273

Project 244  

NLE Websites -- All DOE Office Websites (Extended Search)

PROJECT PARTNER Advanced Technology Systems, Inc. Pittsburgh, PA PROJECT PARTNERS Ohio University Athens, OH Texas A&M University-Kingsville Kingsville, TX WEBSITES http:...

274

Projects | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

and Conferences Supporting Organizations Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Projects Projects 1-10 of 180 Results Prev...

275

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit...

276

Wasco Riparian Buffer Project, Annual Report 2003-2004.  

DOE Green Energy (OSTI)

This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Deschutes River Sub-basin Summary, March 2, 2001. This project is providing the technical planning support needed to implement at least 20 riparian buffer system contracts on approximately 800 acres covering an estimated 36 miles of anadromous fish streams. During this second year of implementation, 17 buffer contracts were established on 173,462 ft. of stream (25.9 miles). Acreage included in the buffers totaled 891.6 acres. Average buffer width was 112 ft. on each side of the stream. Cumulative totals through the first two project years are 26 buffers on 36.6 stream miles covering 1,283.6 acres. Actual implementation costs, lease payments, and maintenance costs will be borne by existing USDA programs: Conservation Reserve (CRP) and Conservation Reserve Enhancement Programs (CREP). The lease period of each contract may vary from 10 to 15 years. During this year, the average lease period was 14.9 years. The total value of contracts established this year is $1,421,268 compared with $55,504 in BPA contract costs to provide the technical support needed to get the contracts implemented. Cumulative contract value for the first two years is $1,919,451 compared to $103,329 cost to BPA. This project provides technical staffing to conduct assessments and develop conservation plans required for riparian buffer systems to help keep pace with a growing backlog of potential buffer projects. This project meets a critical need in the lower Deschutes and lower John Day River basins and complements the Riparian Buffer project approved for Fifteenmile watershed, Project No. 2001-021-00 begun in fiscal year 2001. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion and benefits the mid-Columbia ESU of steelhead.

Graves, Ron

2003-07-01T23:59:59.000Z

277

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Company Smart Grid Project Baltimore Gas Company Smart Grid Project Baltimore Gas and Electric Company Smart Grid Project Baltimore Maryland Black Hills Power Inc Smart Grid Project Black Hills Power Inc Smart Grid Project Rapid City South Dakota North Dakota Minnesota Black Hills Colorado Electric Utility Co Smart Grid Project Black Hills Colorado Electric Utility Co Smart Grid Project Pueblo Colorado CenterPoint Energy Smart Grid Project CenterPoint Energy Smart Grid Project Houston Texas Central Maine Power Company Smart Grid Project Central Maine Power Company Smart Grid Project Augusta Maine Cheyenne Light Fuel and Power Company Smart Grid Project Cheyenne Light Fuel and Power Company Smart Grid Project Cheyenne Wyoming City of Fulton Missouri Smart Grid Project City of Fulton Missouri

278

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Mays Landing New Jersey Maryland District of Columbia Avista Utilities Smart Grid Project Avista Utilities Smart Grid Project Spokane Washington Idaho Baltimore Gas and Electric Company Smart Grid Project Baltimore Gas and Electric Company Smart Grid Project Baltimore Maryland Black Hills Power Inc Smart Grid Project Black Hills Power Inc Smart Grid Project Rapid City South Dakota North Dakota Minnesota Black Hills Colorado Electric Utility Co Smart Grid Project Black Hills Colorado Electric Utility Co Smart Grid Project Pueblo Colorado Burbank Water and Power Smart Grid Project Burbank Water and Power Smart Grid Project Burbank California CenterPoint Energy Smart Grid Project CenterPoint Energy Smart Grid

279

Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].  

DOE Green Energy (OSTI)

The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

Asotin County Conservation District

2008-12-10T23:59:59.000Z

280

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dan Delurey Association for Demand Response & Smart Grid (ADS) National Association of Regulatory Utility Commissioners, ER&E Committee Meeting, July 24, 2012 Portland, OR Program Design & Implementation Working Group Your Logo Here ADS - NAP Project * Design & Implementation includes marketing and marketing communications * Major emphasis on "Lessons Learned" and content that might allow practitioners to determine best practices for them * Project Resources - DOE Funds - ADS Staff - ADS Member in-kind - Non-ADS in-kind www.demandresponsesmartgrid.org 2 ADS - NAP Project * Phase I - Deliverables: * Interviews with Program/Product Managers available via podcast and transcript

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prioritizing and Managing Risk Prioritizing and Managing Risk across the Organization Cindy Caldwell, Senior Technical Advisor Pacific Northwest National Laboratory Russ Haffner Pacific Northwest Site Office SEPTEMBER 20, 2012 Pacific Northwest National Laboratory A Non-Profit Science and Technology Enterprise 2 4,900 staff members 2000 research users annually $1.1B business volume 600 acres / 101 Buildings Broad portfolio of research Basic unit of research is the project 2000 projects/year Line Management Support Programs Key Stakeholders Project Management Senior Laboratory Management Corporate Risk Management Framework Identify Risk Analyze/Evaluate Risk Treat Risk Monitor and Review Establish the Risk Context Risk Management Process (Adapted from ISO 31000)

282

Project Management Principles | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

304ProjectManagementPrinciples.pdf More Documents & Publications Microsoft PowerPoint - DOE O 413 3B Brief v9 with key points in notes Read-Only Accelerating Clean-up at...

283

Inventory of thermal springs and wells within a one-mile radius of Yucca Lodge, Truth or Consequences, New Mexico  

DOE Green Energy (OSTI)

Equity Management Corporation proposes (1) to build about 30 condominiums at the present site of the Yucca Lodge, Truth or Consequences, New Mexico and (2) to heat the condominiums with the natural thermal waters that discharge from the property. To do so the corporation must satisfy the rules and regulations of four state and federal agencies. To satisfy some of the data requirements of these agencies and to provide basic data on the geohydrology of the area this report provides the results of a field inventory of the springs and wells within one mile of the lodge. Table 1 summarizes the data for eight springs and three sites where springs once issued. Table 2 summarizes the data on forty-four operable wells and thirty wells that are unusable in their present condition. Appendices list (1) wells presumed to be in the area but not located during field inspection and (2) wells that could be in the area, but were found to be beyond the one-mile radius. Temperature and specific conductance of the water show only minor variation within the recognized hot-water.

Schwab, G.E.

1982-02-01T23:59:59.000Z

284

An Econometric Analysis of the Elasticity of Vehicle Travel with Respect to Fuel Cost per Mile Using RTEC Survey Data  

Science Conference Proceedings (OSTI)

This paper presents the results of econometric estimation of the ''rebound effect'' for household vehicle travel in the United States based on a comprehensive analysis of survey data collected by the U.S. Energy Information Administration (EIA) at approximately three-year intervals over a 15-year period. The rebound effect is defined as the percent change in vehicle travel for a percent change in fuel economy. It summarizes the tendency to ''take back'' potential energy savings due to fuel economy improvements in the form of increased vehicle travel. Separate vehicles use models were estimated for one-, two-, three-, four-, and five-vehicle households. The results are consistent with the consensus of recently published estimates based on national or state-level data, which show a long-run rebound effect of about +0.2 (a ten percent increase in fuel economy, all else equal, would produce roughly a two percent increase in vehicle travel and an eight percent reduction in fuel use). The hypothesis that vehicle travel responds equally to changes in fuel cost-per-mile whether caused by changes in fuel economy or fuel price per gallon could not be rejected. Recognizing the interdependency in survey data among miles of travel, fuel economy and price paid for fuel for a particular vehicle turns out to be crucial to obtaining meaningful results.

Greene, D.L.; Kahn, J.; Gibson, R.

1999-03-01T23:59:59.000Z

285

Definition: Point To Point Transmission Service | Open Energy...  

Open Energy Info (EERE)

non-firm basis from the Point(s) of Receipt to the Point(s) of Delivery.1 Related Terms transmission lines, transmission line References Glossary of Terms Used in Reliability...

286

Dew Point and Dogs  

NLE Websites -- All DOE Office Websites (Extended Search)

hounds for hunting. I recently had a situation where the temperature was 68 degrees, humidity was 54% and dew point was 62 degrees. My dogs were not able to perform as well as...

287

ARM - Point Reyes News  

NLE Websites -- All DOE Office Websites (Extended Search)

Takes Off in July June 30, 2005 Guest Instruments to Collect Aerosol Data During Coastal Field Campaign June 15, 2005 Mobile Facility Arrives Safe and Sound in Point Reyes...

288

Team Sand Point (SP)  

E-Print Network (OSTI)

The purpose of this flight report is to summarize the field activities of the ShoreZone aerial video imaging (AVI) survey conducted out of Sand Point and Cold Bay in

Team Cold Bay (cb

2011-01-01T23:59:59.000Z

289

Microsoft Word - CX-Harbour_Pointe_130621  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Toni L. Timberman Project Manager - TSE-TPP-2 Proposed Action: Harbour Pointe Small Generator Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Mukilteo, Snohomish County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate UniEnergy Technologies' (UET) 1.5-megawatt battery generation project into BPA's balancing authority (BA) in response to a UET small generator interconnection request. The proposed point of interconnection is at Snohomish Public Utility District's (SnoPUD) Harbour Pointe Substation. In order to integrate

290

NETL: Oil & Natural Gas Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

272012 DE-NT0006556 Goal The objective of this project is to develop improved chemical oil recovery options for the Ugnu reservoir overlying the Milne Point unit in North Slope,...

291

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

US Army Corps of Engineers US Army Corps of Engineers BUILDING STRONG ® ® Dan Brueggenjohann - Project Manager Programs & Project Management Division Tulsa District 14 June 2011 Webbers Falls and Ozark Powerhouse Major Rehabilitation Briefing for 2011 Southwestern Federal Hydropower Conference BUILDING STRONG ® 2 McClellan-Kerr Navigation Project Webbers Falls BUILDING STRONG ® * Run of River Plants * Webbers - 69 MW from three inclined axis units (23 MW each) which were placed in service in 1973. Average annual energy production is 213,000 Megawatt-hours. * Ozark - 115 MW from five inclined axis units (23 MW each) which were placed in service in 1974. Average annual energy production is 429,000 Megawatt -hours. Background BUILDING STRONG ® * Project Scope: Rehabilitation of the Webbers

292

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Dan Brueggenjohann - SWT Project Manager Dan Brueggenjohann - SWT Project Manager Byron Floyd - Resident Engineer 12 June 2013 Ozark and Webbers Falls Powerhouse Major Rehabilitation BUILDING STRONG ® * Project Scope: Rehabilitation of the Ozark Powerhouse to include replacement of five turbines, rehabilitation of all cranes, rehab of water Treatment, and misc aux systems * Project Cost including management expenses: $125.7M ($32.9M Customer Funded) * Turbine Contract Notice to Proceed : July 2005 * Awarded Turbine Contract Amount: $74.5M * Current Turbine Contract Amount: $99.0M * Current Required Completion Date : April 20, 2014 * Anticipated Completion Date: March 24, 2017 Ozark Scope, Cost and Schedule BUILDING STRONG ® Ozark Funding Status Ozark/Webbers Falls Major Rehab

293

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Small Business Webinar: DOE Small Business Webinar: Getting Involved with ESPCs June 20, 2013 Kurmit Rockwell ESPC Project Manager DOE FEMP 2  FEMP Mission Statement  ESPC Review - What are They?  DOE ESPC IDIQ Overview  ESPC ENABLE Overview  Small Business Opportunities  Questions Agenda 3 Mission FEMP works with Federal leaders to accomplish energy change within organizations by bringing expertise from all levels of project and policy implementation to enable Federal Agencies to meet energy related goals and to provide energy leadership to the country. 4 Contracts that allow agencies to do energy projects with minimal up-front capital cost and no special appropriations from Congress. * Arranges project financing * Guarantees cost savings sufficient to cover

294

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

295

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Range Electric Vehicle Driving and Charging Behavior Observed Early in The EV Project John Smart, Idaho National Laboratory 2013-01-1441 INLCON-12-27033 * Overview of INL and The...

296

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Capture An ARPA-E Project Kyler Stitt Sustainable Energy Solutions NETL Conference July 11, 2013 About SES * Founded in 2008 * About 20 employees * Based in Orem, Utah *...

297

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

24 meters orthogonal Forces Various Rotors Demo Projects. Cape Cod, 1996 Uldolmok, Korea Korea, 2002. 1m Triple Helix Korea, 2004. New Cage for 3m GHT Maine 2001 Maine 2003...

298

Prsentation PowerPoint  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant * Clean power with entire flue gas treated to capture 2 Mty CO 2 * Biomass co-firing option leading to zero (or negative) CO 2 emissions * Anchor project for National...

299

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

LLNL-PRES-642912-DRAFT Snhvit CO 2 Storage Project FWP-FEW0174 Task 4 Laura Chiaramonte, Joshua A. White, Whitney Trainor- Guitton and Yue Hao Lawrence Livermore National...

300

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Session Working Session Presented to: Transportation External Coordination Rail Topic Group Transportation External Coordination Rail Topic Group Presented by: Presented by: Chair, Jay Jones Office of National Transportation March 15 2006 March 15 2006 Washington, DC Washington, DC 2 Agenda * Welcome and Introduction * Roll Call * Status/Update on Rail Topic Group at large * Update/Discussion from Individual Subgroups * Summary of CSG/Midwest Routing Project * Update of CSG/NE Routing Project * TRAGIS Update * Wrap Up * Subgroup Breakout

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Microsoft Word - EchoPointCommunityWind_CX_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Hall James Hall Project Manager - TPC-TPP-4 Proposed Action: Integration of the Echo Point Community Wind Generation Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 - Electronic equipment Location: Umatilla County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Echo Point Community Wind's (Echo Point's) small generator interconnection request, BPA proposes to integrate Echo Point's 10-megawatt wind generation project into its balancing authority (BA). The proposed point of interconnection is the Buttercreek Substation owned by the Umatilla Electric Cooperative (UEC). In order to integrate the proposed generation, BPA will install bi-directional generation metering at the Echo Point generation site.

302

Microsoft PowerPoint - Energy CS Prius Accel Testing Results...  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 and the final results can be found in the table to the right. The Energy CS Prius averaged 66.1 mpg over the 5,596 miles of testing (5,440-mile goal). Based on an...

303

Microsoft PowerPoint - Hymotion Prius Accel Testing Results Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

in May 2008 and the final results can be found in the table to the right. The Hymotion Prius averaged 79.5 mpg over the 5,591 miles of testing (5,440-mile goal). Based on an...

304

Newberry EGS Demonstration Project Environmental Analysis (EA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Newberry Volcano Enhanced Geothermal System (EGS) Demonstration Project UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT (BLM) DOI-BLM-OR-P000-2011-0003-EA DOE/EA-1897 ENVIRONMENTAL ASSESSMENT DECEMBER 2011 Location: Federal Geothermal Leases on the West Flank of Newberry Volcano, Deschutes County, 22 miles south of Bend, Oregon Applicant: Davenport Newberry Holdings LLC and AltaRock Energy, Inc. 225 NW Franklin Avenue, Suite 1 Bend, OR 97701 Tel: 541-323-1190 Lead Agency: U.S. Department of the Interior,

305

Alameda 115-kV project  

SciTech Connect

Faced with an increasing demand for electricity, the Bureau of Electricity in Alameda, California decided to investigate alternative means to increase reliability, reduce losses and provide for economic expansion of the power supply system. The investigation indicated the need for 115-kV service to interconnect the Pacific Gas and Electric Company Substation C in Oakland with the Bureau's Atlantic Substation on Alameda Island, a distance of approximately 1.5 miles. Detailed planning and design for the 115-kV project was undertaken. Extensive studies were performed to select the route and determine the design. The studies are described.

1985-01-01T23:59:59.000Z

306

Property:Project Nearest Body of Water | Open Energy Information  

Open Energy Info (EERE)

Nearest Body of Water Nearest Body of Water Jump to: navigation, search Property Name Project Nearest Body of Water Property Type String Pages using the property "Project Nearest Body of Water" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + North Atlantic Ocean + MHK Projects/ADM 3 + Galway Bay site close to Spiddal + MHK Projects/ADM 5 + government Pilot Zone + MHK Projects/Algiers Light Project + Mississippi River + MHK Projects/Anconia Point Project + Mississippi River + MHK Projects/Ashley Point Project + Mississippi River + MHK Projects/Astoria Tidal Energy + East River + MHK Projects/Avalon Tidal + Ingram Thorofare + MHK Projects/Avondale Bend Project + Mississippi River + MHK Projects/BW2 Tidal + Maurice River +

307

How much are Chevrolet Volts in The EV Project driven in EV Mode?  

Science Conference Proceedings (OSTI)

This report summarizes key conclusions from analysis of data collected from Chevrolet Volts participating in The EV Project. Topics include how many miles are driven in EV mode, how far vehicles are driven between charging events, and how much energy is charged from the electric grid per charging event.

John Smart

2013-08-01T23:59:59.000Z

308

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

309

Strategic Focus Points  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Focus Points Focus Points June 2011 1. Establish the human capital and organizational foundation to create a high-performing organization. 2. Implement a cyber risk-management and incident response program that ensures effective security of Federal and M&O networks, provides appropriate flexibility, and meets legal requirements and OMB expectations. 3. Improve IT Services (EITS) into a best-in-class provider from both a technical and business perspective. 4. Implement and institutionalize a reformed, integrated information management governance process that respects the goal to treat M&Os distinctively different than true Federal entities. 5. Transition to 5-year planning and programming, using the NNSA Planning, Programming, Budgeting and Evaluation (PPBE) process as a starting point to include resource and requirements validation.

310

Improving Floating Point Compression  

NLE Websites -- All DOE Office Websites (Extended Search)

Improving Improving Floating Point Compression through Binary Masks Leonardo A. Bautista Gomez Argonne National Laboratory Franck Cappello Argonne National Laboratory Abstract-Modern scientific technology such as particle accel- erators, telescopes and supercomputers are producing extremely large amounts of data. That scientific data needs to be processed using systems with high computational capabilities such as supercomputers. Given that the scientific data is increasing in size at an exponential rate, storing and accessing the data is becoming expensive in both, time and space. Most of this scientific data is stored using floating point representation. Scientific applications executed in supercomputers spend a large amount of CPU cycles reading and writing floating point values, making data compression techniques an interesting way to increase computing efficiency.

311

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Putting enzymes to w ork(tm) Putting enzymes to w ork(tm) ADVANCED LOW ENERGY ENZYME-CATALYZED SOLVENT FOR CO 2 CAPTURE John Reardon; Director, Engineering Project: DE-FE0004228 NETL National CO 2 Capture Technology Meeting; Pittsburgh, PA July 9, 2013 2  Company profile and project overview  Technical background & fundamentals  Progress and current status  Summary of results  Future work OUTLINE 2 3 * St. Louis-based biotechnology company  Developing lower cost, environmentally friendly solutions for CO 2 capture for variety of applications * Integrating proprietary biocatalyst delivery with various solvent systems Company profile AKERMIN INC. 3 4 Project awardee, FFRDC, and Subcontract: Enzyme Supply: Test Site: (NCCC) Fabrication:

312

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

in Western Utility Energy Efficiency in Western Utility in Western Utility Energy Efficiency in Western Utility Resource Plans Resource Plans Implications for Regional Assessments and Implications for Regional Assessments and Initiatives Initiatives Charles Goldman Nicole Hopper Lawrence Berkeley National Laboratory CREPC Meeting San Diego, CA September 28, 2006 Overview of Presentation Overview of Presentation * LBNL/CREPC Resource Assessment Project - Overview - Data Sources * Treatment of Energy Efficiency (EE) in Resource Plans - Why does it matter? * Energy Efficiency in Recent Resource Plans: - Common Inconsistencies and Data Problems - Levels of EE Proposed in Recent Utility Resource Plans * Recommendations and tools for tracking and reporting EE in future resource plans to support West-wide goals and analysis LBNL/CREPC Resource Assessment Project LBNL/CREPC Resource Assessment Project

313

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Risk Project Risk Management Lessons Learned DOE Risk Management Workshop Harry E. Peters, II, PMP Federal Project Director, Level IV & Chris Murphy Navarro Research and Engineering November 5, 2009 2 Uranium Processing Facility (UPF) * Replaces and consolidates existing enriched uranium manufacturing and processing capabilities into a single modern facility * Improves reliability, security, safety, and operational efficiency * Results in $205 million in life cycle cost savings for Y-12 once operational and protected area can be reduced * Reduces worker internal radiological exposures by 90% * Reduces Y-12's security footprint by 90% 3 Uranium Processing Facility 3 UPF Site Layout Fire water tank & pump 4 UPF HEUMF B e ar C re ek R o a d Cooling Towers Gases Facility Process

314

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

LLNL-PRES-642912-DRAFT LLNL-PRES-642912-DRAFT Snøhvit CO 2 Storage Project FWP-FEW0174 Task 4 Laura Chiaramonte, Joshua A. White, Whitney Trainor- Guitton and Yue Hao Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Lawrence Livermore National Laboratory LLNL-PRES-642912-DRAFT  Benefit to Program  Project Goals & Objectives  Technical Status  Summary & Accomplishments  Appendix Outline Lawrence Livermore National Laboratory LLNL-PRES-642912-DRAFT

315

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup Project _____________________ September 21, 2005 FRR Rail Shipment to Idaho Presentation to the DOE Transportation External coordination Working Group (TEC) Mark R. Arenaz DOE-ID Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 2 DOE - Idaho Operations Office FRR Rail Shipment * Overview of Shipment * Operational Aspects * Emergency Response Preparation * Institutional Program * Route Determination * Lessons Learned * Pictures Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 3 Overview of Shipment * First shipment of Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) * Spent Fuel originated in So. Korea * Transport by dedicated ship to Naval Weapons Station - Concord (NWSCo) * Transport by dedicated rail from NWSCo to Idaho National Laboratory Site

316

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

FWP-FEW0174 - Task 5 Presenter: Megan Smith PI: Susan Carroll Yue Hao U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344 Lawrence Livermore National Laboratory 2 Presentation Outline  Benefit to Program  Project Overview  Technical Status  Accomplishments  Summary  Appendix Lawrence Livermore National Laboratory 3 Benefit to the Program  This research project quantifies relationships between fluid flow, heterogeneity, and reaction rates specific to

317

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Solid Sorbents as a Solid Sorbents as a Retrofit Technology for CO 2 Capture July 8, 2013 ADA-ES, Inc. © 2013 ADA-ES, Inc. All Rights Reserved DE-FE0004343 ©2012 ADA-ES, Inc. All rights reserved. © 2013 ADA-ES, Inc. All Rights Reserved ► The overall objective of this funding stage is to validate solid sorbent-based post combustion CO 2 capture through slipstream pilot testing. ► Project Goals: * Achieve 90% CO 2 Capture * Reduce costs of carbon capture Progress towards <35% LCOE Goal * Generate a high purity CO 2 stream * Successfully scale sorbents CO 2 Project Funding and Goals © 2013 ADA-ES, Inc. All Rights Reserved Cooperative Agreement (Award No. DEFE0004343) American Recovery and Reinvestment Act of 2009 Administered by DOE-NETL: Project Manager Bruce Lani

318

Tribal Points of Contacts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Points of Contacts Points of Contacts Tribal Points of Contacts US DOE-Office of Environmental Management 1000 Independence Avenue, SW Washington, DC 20585 ph: (202) 586-5944 fax: (202) 586-5000 Richland Operations Office- Hanford Indian Nations Program P.O. Box 550- MSIN A7-75 Richland, WA 99352 ph: (509) 376-6332 fax: (509) 376-1563 West Valley Demonstration Project Tribal Government Liaison P.O. Box 191- 10282 Rock Springs Road West Valley, NY 14171 ph: (716) 942-4629 fax: (716) 942-2068 Albuquerque Operations Office Tribal Government Liaison P.O. Box 5400 Albuquerque, NM 87185 ph: (505) 845-5977 fax: (505) 845-4154 Tribal Points of Contact Richland Operations Office: Hanford Albuquerque Operations Office: Yakama Indian Nation Environmental Restoration/ Waste Management Program

319

Hanford Area 1990 population and 50-year projections. [Appendix contains computer programming for population projections and graphs showing them by grid areas  

Science Conference Proceedings (OSTI)

The complex and comprehensive safety analysis activities carried out at Hanford for nonreactor nuclear facilities require data from a number of scientific and engineering disciplines. The types of data that are required include data pertaining to current population and population projections. The types of data found in this document include 1990 census totals for residential population within a 50-mile radius of the 100-N, 200, 300, and 400 Area meteorological towers. This document also contains 50-year projections for residential populations within a 50-mile radius of these four meteorological towers. The analysis of population projections indicates that residential population within a 50-mile radius of the four meteorological towers in question will continue to grow through 2040, although at a slower rate each decade. In all cases, the highest growth is projected for the decade ending in the year 2000. The annual growth rate for this period is projected to be 0.646, 0.633, 0.543, and 0.570 in the 100-N, 200, 300, and 400 Areas, respectively. By 2040, these growth rates are projected to drop to 0.082, 0.068, 0.078, 0.078, respectively. 4 refs., 1 figs., 4 tabs.

Beck, D.M.; Scott, M.J.; Shindle, S.F.; Napier, B.A.; Thurman, A.G.; Batishko, N.C. (Pacific Northwest Lab., Richland, WA (United States)); Davis, M.D. (Westinghouse Hanford Co., Richland, WA (United States)); Pittenger, D.B. (Demographics Lab., Olympia, WA (United States))

1991-10-01T23:59:59.000Z

320

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Department of Energy Environmental Management Environmental Management Transportation Transportation Update Update Dennis Ashworth Dennis Ashworth Director, EM Office of Transportation Director, EM Office of Transportation 2 2 Environmental Management Office of Transportation Protecting the Public and the Environment in all aspects of our Transportation Operations Transportation, Logistics and Waste Disposition are Transportation, Logistics and Waste Disposition are Key Contributors to the EM Project Key Contributors to the EM Project Ensuring disposition paths are identified for Ensuring disposition paths are identified for all EM waste and materials all EM waste and materials Providing and coordinating disposition Providing and coordinating disposition

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Transportation External Working Group (TEC) EDWARDS MOVING & RIGGING, INC. Heavy Transport Presentation Presented By What kind of projects do we do? Heavy Transport Heavy Rigging Focus today is Heavy Transport Focus today is Heavy Transport Turbine Generator Transformer Boilers Vessel Press Bridge Duct work Railroad Engine Tank Relocation 440T Building Solid Masonry Even a building facade "These guys can move anything" Pressurizer RA Movement of Hazardous Cargo Major Plant Components & Casks Cask Movement Shipment by Road Shipment by Road Shipment by Railroad Shipments by Barge What makes Transport Contactors Suited for these projects? Complete Package *Engineering *Planning *State-of-the-art-equipment

322

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Atlantic Wind Connection Update Atlantic Wind Connection Update Mohamed M. El-Gasseir, Ph.D. Principal Atlantic Grid Development LLC Department of Energy Workshop Applications for HVDC Technologies April 22, 2013 Information for Discussion Purposes Only * Transmission challenges underlying the AWC Project * Project configuration and technology choice * The rationale * Key challenges * Lessons learned 2 Topics * Accessing most premium of offshore wind (OSW) * Locationally constrained resource * Weak interconnection interface * Need to minimize cost of delivered OSW energy * Availability of system benefits 3 Underlying Transmission Challenges 4 * Very high quality wind * Substantial capacity * Shallow sea floor * Proximity to high demand * Geo-electric appeal Accessing A Most

323

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant Testing of Piperazine Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at Austin Katherine Dombrowski (PM), URS Andrew Sexton (TE), Trimeric Bruce Lani, DOE PM 1 Outline * Project overview * Energy Features of the PZ process - A new flash stripper * Solvent management with PZ - Solution analyses from 3 pilot plants * Future work on aerosol formation - A major challenge for volatile amine * PZ, a competitive alternative 2 Project Objectives * Primary: - Quantify robustness of PZ in an integrated system with 150 o C regeneration * Secondary: - Optimize equipment design & energy performance of advanced flash regeneration - Identify & resolve issues with process control, foaming, solids precipitation

324

Three Mile Island Unit-2 core status summary: a basis for tool development for reactor disassembly and defueling  

DOE Green Energy (OSTI)

The accident at Three Mile Island Unit-2 (TMI-2) on March 28, 1979 caused extensive damage to the core. A variety of analyses were performed using three general approaches to determine the extent of core damage. First, thermal-hydraulic events were reconstructed using available data, thermal-hydraulic principles, and computer analyses. Second, determinations of the hydrogen generated yielded estimates of the amount of zircaloy oxidized and embrittled. Third, the type and quantity of fission products released during the accident were used to estimate the location of core damage and the fuel temperatures which were achieved. Uncertainties exist in each type of determination due to the equivocal nature of the data. This paper reviews and summarizes the core damage assessments which have been made, identifies the minimum and maximum bounds of damage, and establishes a reference description for the current status of the core.

Croucher, D.W.

1981-05-01T23:59:59.000Z

325

Science Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

326

Energy-Saving Projects in My Community | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy-Saving Projects in My Community Energy-Saving Projects in My Community Energy-Saving Projects in My Community August 23, 2011 - 4:04pm Addthis Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs Working in the communications office at the Department of Energy, I'm always researching, writing, and talking about our latest initiatives. Topics run the gamut-from student-led solar competitions to engineering breakthroughs in electric vehicle design. I've learned that there are so many interesting projects underway in the clean energy space. Still, writing about an innovative, clean energy project in a state 1,000 miles away is one thing-discovering such a project in your own neighborhood is quite another. That's exactly what happened a couple of weeks ago when I walked into my

327

TAKE HOME POINTS  

E-Print Network (OSTI)

? ? In response to increasing greenhouse gas levels, climate models project an increase in the amount of water evaporating and precipitating over the Earth a strengthening of the global hydrologic cycle. ? ? Precipitation is projected to increase in the near-equatorial regions, which tend to be wet in the present climate. ? ? In subtropical land areas places that are already relatively dryprecipitation is projected to decrease during the 21st century. ? ? Mid-latitude storm track are projected to move poleward along with the poleward edge of the subtropical dry zones. WILL THE WET GET WETTER AND THE DRY DRIER? Warming of the global climate is expected to be accompanied by a reduction in rainfall in the subtropics and an increase in precipitation in subpolar latitudes and some equatorial regions. This pattern can be described in broad terms as the wet getting wetter and the dry getting drier, since subtropical land regions are mostly semi-arid today, while most subpolar regions currently have an excess of precipitation over evaporation. Though clearly a feature of a warming global climate, this characterization of the changing precipitation pattern cannot be applied to every locale, but should instead be thought of as a large-scale tendency that can be modified by local conditions in some cases. As seen in the map below, the drying is projected to be strongest near the poleward margins of the subtropics (for example, South Africa, southern Australia, the Mediterranean, and the south-western U.S.), a pattern that can be described as a poleward expansion of these semi-arid zones. This large-scale pattern of change is a robust feature present in nearly all of the simulations conducted by the world's climate modeling groups for the 4th Assessment of the

unknown authors

2007-01-01T23:59:59.000Z

328

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

329

Evaluation of Juvenile Fish Bypass and Adult Fish Passage Facilities at Three-Mile Falls Dam; Umatilla River, Oregon, 1989 Annual Report.  

DOE Green Energy (OSTI)

We report on our progress from October 1989 through September 1990 on evaluating juvenile fish bypass and adult fish passage facilities at Three Mile Falls Dam on the Umatilla River. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). Study objectives addressed by ODFW and CTUIR are: (1) ODFW (Report A): Operate and evaluate the juvenile fish bypass system in the West Extension Irrigation District canal at Three Mile Falls Dam; and (2) CTUIR (Report 8): Examine the passage of adult salmonids at Three Mile Falls Dam. The study is part of a program to rehabilitate anadromous fish stocks in the Umatilla River Basin that includes restorations of coho salmon Oncorhynchus Wsutch and chinook salmon 0. tshawytscha and enhancement of summer steelhead 0. mytiss.

Nigro, Anthony A.

1990-09-01T23:59:59.000Z

330

Microsoft PowerPoint - 05 Okonski final Project Management Workshop...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 March 2010 Topics 1 S t f E Cli t Ch 1. Secretary of Energy on Climate Change 2. Global Warming & Climate Change 3 Wh A G h G ? 3. What Are Greenhouse Gases? 4. What is a...

331

Big Rock Point Aged Material Sampling Program -- Project Closeout Report  

Science Conference Proceedings (OSTI)

In submitting an application for license renewal for a nuclear power plant, utilities must demonstrate that aging effects applicable to plant components will be effectively managed during the extended operating term. Destructive and non-destructive evaluation of components in operating plants provides particularly relevant information on aging effects and mechanisms that can be used to support a license renewal submittal. Such information is difficult to obtain. This report describes an effort to obtain ...

2002-05-24T23:59:59.000Z

332

Microsoft PowerPoint - Project X Discussion_SDH.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

* Possible areas of ANL collaboration: - Linac beam dynamics simulations and design optimization - Low energy linac accelerating structures (spoke resonators) - Cavity...

333

Windy Gap Firming Project  

NLE Websites -- All DOE Office Websites (Extended Search)

action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line...

334

UGP Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

River. Seven dams and powerplants have the installed capacity of 2,610 MW. That hydroelectric power is delivered across about 7,919 circuit-miles of Federal transmission line....

335

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook and Yamhill Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line in Tillamook and Yamhill counties, Oregon. Associated activities would include resurfacing roads, adding drainage, widening 3 miles of road, constructing 0.1 mile of new road, maintaining culverts, and constructing outlet ditches and retaining walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is available at the project website: http://efw.bpa.gov/environmental_services/Document_Library/Boyer-Tillamook/.

336

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercialization of the SuperOPF Commercialization of the SuperOPF Framework: Phase III (Theme: Co- optimization Stochastic SuperOPF- renewables) Performers: PSERC: Hsiao-Dong Chiang - LEAD Cornell University: Ray Zimmerman Bigwood Systems, Inc.: Patrick Causgrove, Bin Wang Phase I: 1.(support industrial model) A commercial-grade core SuperOPF software supporting various industrial-grade power system models such as (i) CIM-compliance; and (ii) PSS/E data format 2. A multi-stage OPF solver with adaptive homotopy-based Interior Point Method for large- scale power systems (PJM: 14,000-bus data) Bigwood Systems Inc., 2013 3 Results: Efficiency and Robustness (Analytical Jacobian matrices) Loading Conditions One-Staged Interior Point Method Multi-Staged Scheme 1 Succeeded Succeeded

337

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Coupling Between Oceanic Upwelling and Cloud Coupling Between Oceanic Upwelling and Cloud Coupling Between Oceanic Upwelling and Cloud - - Aerosol Properties Aerosol Properties at the AMF Point Reyes Site at the AMF Point Reyes Site Maureen Dunn , Mike Jensen , Pavlos Kollias , Mark Miller , Peter Daum Mary Jane Bartholomew , David Turner , Elisabeth Andrews and Anne Jefferson Introduction Ground based observations from the MASRAD, Pt. Reyes AMF July 1-Sept 15, 2005 indicate a relationship between coastal marine stratus cloud properties, boundary layer cloud condensation nuclei and the upwelling of cool oceanic waters measured at an offshore NOAA buoy. Cloud Drizzle to CCN Atmosphere to Cloud Upwelling SST to Atmosphere Conclusion Coastal marine stratus clouds increase in thickness as the underlying sea surface

338

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Utility-Scale Solar 2012 Utility-Scale Solar 2012 An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States Mark Bolinger & Samantha Weaver Lawrence Berkeley National Laboratory September 2013 1 This research was supported by funding from the U.S. Department of Energy's SunShot Initiative. Presentation Outline * Recent market growth has resulted in a critical mass of project-level data ripe for analysis * Key findings from this inaugural edition  Installed Costs/Prices  Operating (O&M) Costs  Performance (Capacity Factors)  Power Purchase Agreement ("PPA") Prices 2 A few background notes about this first edition: * Certain data (e.g., O&M costs) were still rather limited for this first edition, but are

339

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project 2E Project 2E Mapping Energy Futures: The SuperOPF Planning Tool Bill Schulze, Dick Schuler, Ray Zimmerman, Jubo Yan*, Charles Marquet* (Cornell) Dan Shawhan, Biao Mao*, Zamiyad Dar*, Andy Kindle* (RPI) John Taber (FERC) Network reductions from Dan Tylavsky, Di Shi, Yingying Qi*, Yujia Zhu* (ASU) * Graduate Student PSERC Existing Planning Tools * Are very detailed but do not optimize investment over the planning region, or * Are highly aggregated using bubbles and pipes (or only a small number of nodes) to represent the network, and * None include environmental modeling of ambient pollution * Few or none include joint variation of load, wind, and solar, by location PSERC SuperOPF Planning Tool Uses three network reductions (for the EI, ERCOT and WECC) from Dan

340

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recalibration Methodology for Transmitters and Recalibration Methodology for Transmitters and Instrumentation Pradeep Ramuhalli Pacific Northwest National Laboratory May 21-22, 2013 2 Project Overview  Goal: Develop and evaluate a standardized framework for next- generation online monitoring applicable to current and future nuclear systems  Participants: PNNL (Pradeep Ramuhalli, Jamie Coble, Guang Lin, Brett Braatz) AMS (Brent Shumaker)  Research directly supports primary goals of LWRS, SMR, ARC, NGNP, and MPACT  Supports secondary goals of AF and UNFD 3 Project Background  Measurement reliability key to safe, economic and secure operation of nuclear systems Interval-based recalibration used to assure reliability  Current practices have several drawbacks Time consuming and expensive

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1613 NTSF 1613 NTSF National Transportation Stakeholder Forum West Valley Demonstration Project A Short History and Status May 7, 2013 www.wv.doe.gov Bryan C. Bower, Director bryan.bower@wv.doe.gov 1 051613 NTSF West Valley Demonstration Project (WVDP) Mission 2 The WVDP mission was defined by an act of Congress in 1980 - Public Law 98-368 1. Solidify the high-level radioactive waste at the Center * 99.7% of the curies in the tanks were vitrified and the glass is contained in 275 stainless steel canisters 2. Develop containers suitable for permanent disposal of the waste 3. Transport the solidified waste to a federal repository for permanent disposal 4. Dispose of low-level radioactive waste (LLW) and transuranic (TRU) waste 5. Decontaminate and decommission the underground

342

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

This presentation was given for the This presentation was given for the Navigant Research Webinar on Fast DC Charging for Electric Vehicles * http://www.navigantresearch.com/webinar/fast-dc-charging-for-electric-vehicles * April 9, 2013 1 Lessons Learned on the EV Project and DC Fast Charging Garrett Beauregard Executive Vice President and General Manager, eTec Labs April 9, 2013 ECOtality Company Overview Leading Hardware, Software and R&D for electric transportation Diversified revenue base of 3 complementary business segments Blink * Residential, public & commercial EV charging solutions * Contracted by U.S. Dept. of Energy for The EV Project (~$115M) * Over 11,000 chargers installed as of April 2013 Minit-Charger * Fast charging electric material handling and ground support equipment

343

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2006 8, 2006 LITTLE ROCK DISTRICT STUDIES AFFECTING FEDERAL HYDROPOWER Hydropower Conference June 8, 2006 US Army Corps US Army Corps of Engineers of Engineers ® ® One Corps Serving The Army and the Nation US Army Corps US Army Corps of Engineers of Engineers ® ® One Corps Serving The Army and the Nation US Army Corps US Army Corps of Engineers of Engineers ® ® One Corps Serving The Army and the Nation Current Studies/Projects Current Studies/Projects * 303(d) Listing - Bull Shoals, Norfork, Dardanelle - Districts Position *Table Rock Auxiliary Spillway * White River Minimum Flows * Arkansas River Navigation * White River Basin Comprehensive Study * Norfork Stilling Basin Aeration * Water Supply Storage Reallocations US Army Corps US Army Corps of Engineers of Engineers ® ® One Corps Serving

344

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Northern Power Systems, Inc 6 Northern Power Systems, Inc Northern Power Systems 182 Mad River Park Waitsfield, VT 05673 Ultracapacitor EnergyBridge(tm) UPS for Palmdale Water District DOE/ESS PEER Review November 3, 2006 11/03/2006 Northern Power Systems, Inc © 2006 2 Northern Power  Distributed Energy Systems Corp (NASDAQ:DESC)  Energy Solutions since 1974  Products, Systems and Services Divisions  Hundreds of Projects around the World  HQ and Manufacturing in Vermont  Regional offices in NY, TX, CA, England, and Mexico 11/03/2006 Northern Power Systems, Inc © 2006 3 Project Overview  CEC - California Energy Commission  Funding agency  Palmdale Water District  Award recipient, host site  Northern Power  Technology provider  Black & Veatch  Owner's engineer

345

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bus Bus NaS Battery Energy Storage Project U.S. DOE Peer Review Seattle, WA October 8, 2009 Steve Eckroad Electric Power Research Institute Seckroad@epri.com (704) 595-2717 2 © 2009 Electric Power Research Institute, Inc. All rights reserved. Acknowledgements This project is part of the joint energy storage initiative between the New York State Energy Research and Development Agency (NYSERDA) and the Energy Storage Systems Program of the U.S. Department of Energy (DOE/ESS) and managed by Sandia National Laboratories (SNL). Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC84-94AL85000. * US DOE and NYSERDA - Imre Gyuk and Joe Sayer

346

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

from IGCC Gas Streams from IGCC Gas Streams Using the AC-ABC Process 2013 NETL CO 2 Capture Technology Meeting July 8-11, 2013 Pittsburgh, PA. SRI- Who We Are A world-leading independent R&D organization 2 * Founded by the Stanford University in 1946 - Non-profit corporation; became independent in 1970 - Name changed to SRI International in 1977 * 2,500 staff members; more than 20 locations worldwide * 2012 revenues: ~$545 million. CO 2 Capture Programs at SRI Advanced Carbon Sorbent Process Field Demonstration at U. Toledo 250 kW Chilled Ammonia Process Mini-pilot System 50 kW High Temperature PBI Membrane Skid. Pilot Unit for Capture of CO2 from Air Project Overview * Project Participants: - SRI International. - Bechtel Hydrocarbon Treatment Solutions, Inc. - EIG, Inc. - National Carbon Capture Center

347

Evaluating Point Forecasts  

E-Print Network (OSTI)

Typically, point forecasting methods are compared and assessed by means of an error measure or scoring function, such as the absolute error or the squared error. The individual scores are then averaged over forecast cases, to result in a summary measure of the predictive performance, such as the mean absolute error or the (root) mean squared error. I demonstrate that this common practice can lead to grossly misguided inferences, unless the scoring function and the forecasting task are carefully matched. Effective point forecasting requires that the scoring function be specified ex ante, or that the forecaster receives a directive in the form of a statistical functional, such as the mean or a quantile of the predictive distribution. If the scoring function is specified ex ante, the forecaster can issue the optimal point forecast, namely, the Bayes rule. If the forecaster receives a directive in the form of a functional, it is critical that the scoring function be consistent for it, in the sense that the expect...

Gneiting, Tilmann

2009-01-01T23:59:59.000Z

348

Umatilla River Basin Anadromus Fish Habitat Enhancement Project : 1994 Annual Report.  

DOE Green Energy (OSTI)

The Umatilla Basin Anadromous Fish Habitat Enhancement Project is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, Section 7.6-7.8 and targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing cooperative instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation (hereafter referred to as Reservation) from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower l/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River in the vicinity of Gibbon, Oregon. In 1993, the project shifted emphasis to a comprehensive watershed approach, consistent with other basin efforts, and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. During the 1994-95 project period, a one river mile demonstration project was implemented on two privately owned properties on Wildhorse Creek. This was the first watershed improvement project to be implemented by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) off of the Reservation. Four 15 year riparian easements and two right-of-way agreements were secured for enhancement of one river mile on Wildhorse Creek and l/2 river mile on Meacham Creek. Enhancements implemented between river mile (RM) 9.5 and RM 10.5 Wildhorse Creek included: (1) installation of 1.43 miles of smooth wire high tensile fence line and placement of 0.43 miles of fence posts and structures to restrict livestock from the riparian corridor, (2) construction of eighteen sediment retention structures in the stream channel to speed riparian recovery by elevating the stream grade, slowing water velocities and depositing sediments onto streambanks to provide substrate for revegetation, and (3) revegetation of the stream corridor, terraces and adjacent pasture areas with 644 pounds of native grass seed (when commercially available) or close species equivalents and 4,000 native riparian shrub/tree species to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. Three hundred pounds of native grass/legume seed (including other grasses/legumes exhibiting native species characteristics) were broadcast in existing Boston Canyon Creek, Meacham Creek and Umatilla River project areas. The addition of two properties into the project area between RM 4.25 and RM 4.75 Meacham Creek during the 1995-96 work period will provide nearly complete project coverage of lower Meacham Creek corridor areas on the Reservation. Water quality monitoring continued for temperature and turbidity throughout the upper Umatilla River Watershed. Survey of cross sections and photo documentation of riparian recovery within the project areas provided additional baseline data. Physical habitat surveys continued to be conducted to characterize habitat quality and to quantify various habitat types by area. This information will be utilized to assist in identification of habitat deficient areas within the watershed in which to focus habitat restoration efforts. These efforts were coordinated with the CTUIR Umatilla Basin Natural Production Monitoring and Evaluation (UBNPME) Project. Poor land use practices, which have altered natural floodplain dynamics and significantly reduced or eliminated fisheries habitat, continued to be identified in the Mission Creek Subbasin. Complied data is currently being incorporated into a data layer for a Geographic Information System (GIS) data base. This effort is being coordinated with the Natural Resource Conservation Service (NRCS). Community outreach efforts and public education opportunities continued during the reporting period. CTUIR cooperatively sponsored a bioengineering workshop on February 23, 1995 with the Oregon De

Shaw, R. Todd

1994-05-01T23:59:59.000Z

349

Tazimina hydroelectric project, Iliamna, Alaska. Final technical and construction cost report  

DOE Green Energy (OSTI)

The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is on the Tazimina River about 12 miles northeast of Iliamna Lake. The taximina River flows west from the Aleutian Range. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

NONE

1998-08-01T23:59:59.000Z

350

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

351

Alabama Institute for Deaf and Blind Biodiesel Project Green  

DOE Green Energy (OSTI)

Through extensive collaboration, Alabama Institute for Deaf and Blind (AIDB) is Alabama's first educational entity to initiate a biodiesel public education, student training and production program, Project Green. With state and national replication potential, Project Green benefits local businesses and city infrastructures within a 120-mile radius; provides alternative education to Alabama school systems and to schools for the deaf and blind in Appalachian States; trains students with sensory and/or multiple disabilities in the acquisition and production of biodiesel; and educates the external public on alternative fuels benefits.

Edmiston, Jessica L

2012-09-28T23:59:59.000Z

352

Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect an additional 1.3 miles of stream and 298.3 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Improving fish passage in Bear Creek to restore tributary and mainstem access; (4) Planting and seeding 6.7 stream miles with 7,100 plants and 365 lbs. of seed; (5) Establishing 18 new photopoints and retaking 229 existing photopoint pictures; (6) Monitoring stream temperatures at 12 locations on 6 streams; (7) completing riparian fence, water gap and other maintenance on 98.7 miles of project fences. Since initiation of the project in 1984 over 62 miles of anadromous fish bearing streams and 1,910 acres of habitat have been protected, enhanced and maintained.

McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

2001-04-01T23:59:59.000Z

353

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

354

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Conard Stair Conard Stair Enforcement Program Manager B&W Y-12 March 2012 Enforcement Coordination Working Group Spring 2012 Meeting Y-12 Approach to Enforcement Y-12 Enforcement Program Office (EPO) * Integrated program with a single point of contact for enforcement activities for radiological protection, worker safety and health, and classified information security * Proceduralized and automated process that provides consistent documentation of compliance determinations and reporting * Uses a decentralized approach with Line Management Price- Anderson Officers (LMPOs) assisted by a cadre of subject matter experts to perform screening determinations * Provides policy, direction, guidance, and independent oversight * Serves as chief technical advisor to senior leadership team on

355

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.  

DOE Green Energy (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H. [Oregon Department of Fish and Wildlife

2009-07-01T23:59:59.000Z

356

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

increases pressure, leads to measurable uplift; short term leakage leads to subsidence *GPS (point positions, high temporal resolution) and InSAR (high spatial resolution)...

357

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

STAR Grant Research STAR Grant Research on Carbon Geosequestration Barbara Klieforth National Center for Environmental Research Office of Research and Development US Environmental Protection Agency U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 NCER's Extramural Programs * Science To Achieve Results (STAR) - Targeted Research Grants through RFAs - Competed Centers * Fellowship Programs - STAR Graduate - Greater Research Opportunities (GRO) Undergraduate * Small Business Innovation Research (SBIR) Contracts Supporting the New ORD Structure * Unprecedented timescale & scope imposes novel

358

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

capture and sequestration: capture and sequestration: Technology options for new and retrofit applications 2 nd U.S.-China CO 2 Emissions Control Science & Technology Symposium Organized by Zhejiang University and Columbia University 29-30 May 2008 - Hangzhou, People's Republic of China Richard D. Doctor, Chemical Engineer, P.E. Section Leader, Energy Systems Division Argonne National Laboratory 9700 S. Cass Ave. Argonne, IL USA 60439-4815 rdoctor@anl.gov 2 Project Sponsor U.S. Department of Energy Office of Fossil Energy www.fe.doe.gov 3 Supporting the United Nations IPCC -Special Report‖ on Carbon Dioxide Capture and Storage

359

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Financing Essentials Financing Essentials Oklahoma Tribal Leader Forum Oklahoma City, Oklahoma August 13, 2012 About DOE Office of Indian Energy Goals and objectives: * Promote Indian tribal energy development, efficiency, and use * Reduce or stabilize energy costs * Enhance and strengthen Indian tribal energy and economic infrastructure relating to natural resource development and electrification * Bring electrical power and service to Indian land and the homes of tribal members Energy Policy Act of 2005, Title V, Sec. 502 2 Why Complete a Renewable Energy Project? Income Jobs Experience Cost savings Cost stabilization Tax revenue Industry exposure Energy reliability Self reliance Environmental sustainability Benefits vary based on the type and scale of

360

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

IOGCC/SSEB PTTF REPORT IOGCC/SSEB PTTF REPORT THE PIPELINE PROJECT: Analysis of potential pipeline infrastructure, transportation & storage of CO 2 Presented at DOE's Carbon Storage Program Infrastructure Annual Review Meeting Nov. 15, 2011 Acknowledgement * This material is based upon work supported by the U.S. Department of Energy's National Energy Technology Laboratory. The Report Four sections: 1. Overview 2. Background 3. Analysis 4. Recommendations PART 1: OVERVIEW * Pipeline Transportation Task Force * Collaborative Work Group Model * Task Force Objectives IOGCC-SSEB CO 2 Pipeline Transportation Task Force (PTTF) * Offshoot of IOGCC's Carbon Capture and Geologic Storage Task Force * Southeast Regional Carbon Sequestration Partnership Focus Area * Collaboration: Task Force Composition

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

362

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

363

Project 364  

NLE Websites -- All DOE Office Websites (Extended Search)

765-494-5623 lucht@purdue.edu DEVELOPMENT OF NEW OPTICAL SENSORS FOR MEASUREMENT OF MERCURY CONCENTRATIONS, SPECIATION, AND CHEMISTRY Project Description The feasibility of...

364

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State...

365

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

366

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

367

Project 283  

NLE Websites -- All DOE Office Websites (Extended Search)

NJ 07039 973-535 2328 ArchieRobertson@fwc.com Sequestration ADVANCED CO 2 CYCLE POWER GENERATION Background This project will develop a conceptual power plant design...

368

Project 197  

NLE Websites -- All DOE Office Websites (Extended Search)

will bring economic value to both the industrial customers and to the participating companies. * Complete project by June 2006. Accomplishments A ceramic membrane and seal...

369

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh,...

370

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Interdisciplinary Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford...

371

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for...

372

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* Concrete products in this project * Standard 8" concrete blocks * Standard 4' x 8' fiber-cement boards CO 2 The Goals * Maximizing carbon uptake by carbonation (at least...

373

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Evaluating Potential Groundwater Impacts and Natural Geochemical...

374

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date...

375

Project 252  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Global Climate Energy Project Terralog Technologies TransAlta University of Alaska Fairbanks Washington State Department of Natural Resources Western Interstate...

376

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

research partnership to improve the understanding of CO 2 within coal and shale reservoirs. 2 2 3 Presentation Outline * Program Goal and Benefits Statement * Project...

377

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

mechanistic insights 5 Project Overview: Scope of work * Task 1 - Pipeline and Casing Steel Corrosion Studies * Evaluate corrosion behavior of pipeline steels in CO 2 mixtures...

378

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project Program Goals * Technical...

379

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* This project pinpoints the critical catalyst features necessary to promote carbon dioxide conversion to acrylate, validate the chemical catalysis approach, and develop an...

380

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources...

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number...

382

Nanotexturing of surfaces to reduce melting point.  

DOE Green Energy (OSTI)

This investigation examined the use of nano-patterned structures on Silicon-on-Insulator (SOI) material to reduce the bulk material melting point (1414 C). It has been found that sharp-tipped and other similar structures have a propensity to move to the lower energy states of spherical structures and as a result exhibit lower melting points than the bulk material. Such a reduction of the melting point would offer a number of interesting opportunities for bonding in microsystems packaging applications. Nano patterning process capabilities were developed to create the required structures for the investigation. One of the technical challenges of the project was understanding and creating the specialized conditions required to observe the melting and reshaping phenomena. Through systematic experimentation and review of the literature these conditions were determined and used to conduct phase change experiments. Melting temperatures as low as 1030 C were observed.

Garcia, Ernest J.; Zubia, David (University of Texas at El Paso El Paso, TX); Mireles, Jose (Universidad Aut%C3%94onoma de Ciudad Ju%C3%94arez Ciudad Ju%C3%94arez, Mexico); Marquez, Noel (University of Texas at El Paso El Paso, TX); Quinones, Stella (University of Texas at El Paso El Paso, TX)

2011-11-01T23:59:59.000Z

383

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

384

Microsoft Word - cleanup projects at Idaho.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy Office of Inspector General Office of Audit Operations Audit Report Major Clean-Up Projects at the Idaho National Engineering and Environmental Laboratory DOE/IG-0649 May 2004 well after its scheduled July 1, 2003, completion date - in fact, it is currently estimated to be sometime in 2005 or 2006. The Department also did not meet its original completion goal for the Three Mile Island Project and later reduced the scope of the project to compensate for schedule slippages. Although events outside of the Department's control contributed to these schedule delays, enhancements to contract and project management practices could improve the way the Department and its contractors react to these events and ultimately the projects' outcomes.

385

EIS-0393: Montanore Project, Montana | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93: Montanore Project, Montana 93: Montanore Project, Montana EIS-0393: Montanore Project, Montana Summary This EIS, prepared by the U. S. Department of Agriculture (Kootenai National Forest) and the Montana Department of Environmental Quality, evaluates the environmental impacts of a proposal to build a copper and silver underground mine in a location about 18 miles south of Libby, Montana. DOE's Bonneville Power Administration, a cooperating agency, has jurisdiction over the construction of a transmission line and two substations needed for powering the mine facilities if the proposed action is implemented. Kootenai National Forest's Montanore Project website: http://www.fs.fed.us/nepa/fs-usda-pop.php/?project=11743 Public Comment Opportunities No public comment opportunities available at this time.

386

Moab Project Continues Progress on Tailings Removal with Contract  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Project Continues Progress on Tailings Removal with Contract Moab Project Continues Progress on Tailings Removal with Contract Transition Moab Project Continues Progress on Tailings Removal with Contract Transition December 27, 2012 - 12:00pm Addthis Laborers place a disposable liner in a tailings container. Laborers place a disposable liner in a tailings container. MOAB, Utah - The Moab mill tailings removal project in Utah ended the year having shipped more than 35 percent of the total 16 million tons of uranium mill tailings off-site. The tailings are being transported by rail 30 miles north to a disposal cell for permanent storage. More than 1 million tons of tailings were shipped during fiscal year 2012, which closed at the end of September. The Moab Project also successfully transitioned both of its prime contracts

387

Moab Project Continues Progress on Tailings Removal with Contract  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Project Continues Progress on Tailings Removal with Contract Moab Project Continues Progress on Tailings Removal with Contract Transition Moab Project Continues Progress on Tailings Removal with Contract Transition December 27, 2012 - 12:00pm Addthis Laborers place a disposable liner in a tailings container. Laborers place a disposable liner in a tailings container. MOAB, Utah - The Moab mill tailings removal project in Utah ended the year having shipped more than 35 percent of the total 16 million tons of uranium mill tailings off-site. The tailings are being transported by rail 30 miles north to a disposal cell for permanent storage. More than 1 million tons of tailings were shipped during fiscal year 2012, which closed at the end of September. The Moab Project also successfully transitioned both of its prime contracts

388

EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction  

NLE Websites -- All DOE Office Websites (Extended Search)

88: Cameron Pipeline Expansion Project and Cameron LNG 88: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA SUMMARY Federal Energy Regulatory Commission (FERC) is preparing an EIS, with DOE as a cooperating agency, to analyze the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. PUBLIC COMMENT OPPORTUNITIES Comment Period Ends: 03/03/14 DOCUMENTS AVAILABLE FOR DOWNLOAD January 10, 2014

389

EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation 933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA SUMMARY DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington.

390

EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Cameron Pipeline Expansion Project and Cameron LNG 8: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA SUMMARY Federal Energy Regulatory Commission (FERC) is preparing an EIS, with DOE as a cooperating agency, to analyze the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 13, 2012 EIS-0488: Notice of Intent to Prepare an Environmental Impact Statement

391

ARPA-E Technology Showcase: Project Spotlight | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Showcase: Project Spotlight Technology Showcase: Project Spotlight ARPA-E Technology Showcase: Project Spotlight March 1, 2011 - 1:49pm Addthis William Mouat explains the PolyPlus battery technology. | Energy Department photo, credit Ken Shipp. William Mouat explains the PolyPlus battery technology. | Energy Department photo, credit Ken Shipp. April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs Last night, we had the chance to visit with a few of the researchers and scientists behind the exciting projects on display at the 2011 ARPA-E Energy Innovation Summit Technology Showcase. The following projects represent a few of the highlights we found: PolyPlus At Berkeley, CA-based PolyPlus Battery Company, researchers are developing a lithium-air battery that could enable an electric car to travel 500 miles

392

Natural Gas Wells Near Project Rulison  

Office of Legacy Management (LM)

for for Natural Gas Wells Near Project Rulison Second Quarter 2013 U.S. Department of Energy Office of Legacy Management Grand Junction, Colorado Date Sampled: April 3, 2013 Background: Project Rulison was the second underground nuclear test under the Plowshare Program to stimulate natural-gas recovery from deep, low-permeability formations. On September 10, 1969, a 40-kiloton-yield nuclear device was detonated 8,426 feet (1.6 miles) below the ground surface in the Williams Fork Formation, at what is now the Rulison, Colorado, Site. Following the detonation, a series of production tests were conducted. Afterward, the site was shut down and then remediated, and the emplacement well (R-E) and the reentry well (R-Ex) were plugged. Purpose: As part of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) mission

393

TMI-2 Vessel Investigation Project integration report  

Science Conference Proceedings (OSTI)

The Three Mile Island Unit 2 (TMI-2) Vessel Investigation Project (VIP) was an international effort that was sponsored by the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The primary objectives of the VIP were to extract and examine samples from the lower head and to evaluate the potential modes of failure and the margin of structural integrity that remained in the TMI-2 reactor vessel during the accident. This report presents a summary of the major findings and conclusions that were developed from research during the VIP. Results from the various elements of the project are integrated to form a cohesive understanding of the vessel`s condition after the accident.

Wolf, J. R.; Rempe, J. L.; Stickler, L. A.; Korth, G. E.; Diercks, D. R.; Neimark, L. A.; Akers, D W; Schuetz, B. K.; Shearer, T L; Chavez, S. A.; Thinnes, G. L.; Witt, R. J.; Corradini, M L; Kos, J. A. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1994-03-01T23:59:59.000Z

394

Corrective action investigation plan for Project Shoal Area CAU No. 416  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

NONE

1996-08-01T23:59:59.000Z

395

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

396

Microsoft PowerPoint - 16.1555_Chad Henderson_Final | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

555Chad HendersonFinal Microsoft PowerPoint - 16.1555Chad HendersonFinal Microsoft PowerPoint - 16.1555Chad HendersonFinal More Documents & Publications Sample Project...

397

Assessment of extent and degree of thermal damage to polymeric materials in the Three Mile Island Unit 2 Reactor building  

DOE Green Energy (OSTI)

This paper describes assumptions and procedures used to perform thermal damage analysis caused by post loss-of-coolant-accident (LOCA) hydrogen deflagration at Three Mile Island Unit 2 Reactor. Examination of available photographic evidence yields data on the extent and range of thermal and burn damage. Thermal damage to susceptible material in accessible regions of the reactor building was distributed in non-uniform patterns. No clear explanation for non-uniformity was found in examined evidence, e.g., burned materials were adjacent to materials that appear similar but were not burned. Because these items were in proximity to vertical openings that extend the height of the reactor building, we assume the unburned materials preferentially absorbed water vapor during periods of high, local steam concentration. A control pendant from the polar crane located in the top of the reactor building sustained asymmetric burn damage of decreasing degree from top to bottom. Evidence suggests the polar-crane pendant side that experienced heaviest damage was exposed to intense radiant energy from a transient fire plume in the reactor containment volume. Simple hydrogen-fire-exposure tests and heat transfer calculations approximate the degree of damage found on inspected materials from the containment building and support for an estimated 8% pre-fire hydrogen.

Alvares, N.J.

1985-06-01T23:59:59.000Z

398

A point of order 8  

E-Print Network (OSTI)

A formula expressing a point of order 8 on an elliptic curve, in terms of the roots of the associated cubic polynomial, is given. Doubling such a point yields a point of order 4 distinct from the well-known points of order 4 given in standard references such as "A course of Modern Analysis" by Whittaker and Watson.

Semjon Adlaj

2011-10-03T23:59:59.000Z

399

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

NLE Websites -- All DOE Office Websites (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

400

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

402

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

403

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

404

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

405

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

406

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

407

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

408

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Customer Acceptance of Smart Grid Customer Acceptance of Smart Grid DOE Energy Advisory Committee Meeting June 6, 2013 Judith Schwartz, To the Point + INNOVATORS EARLY ADOPTERS EARLY MAJORITY LATE MAJORITY LATE ADOPTERS Indifferents Tech Enthusiasts Green Altruists Comfort Lovers Cost Conscious Doubters Green buildings Simple feedback interface Price incentives Seamless automation Who Are Our Customers? + Why Will They Care About SG? 1. Information, incentives, and automation to easily reduce or defer electricity use 2. Integrate clean generation and transportation 3. Reduce, pinpoint, and restore outages + Fly Under the Radar Active Engagement Slow Build Back end deployment first in sequence AMI rollout in process or pilots are imminent Practice incremental modernization efforts High % of "indifferent"

409

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vehicle to Grid Vehicle to Grid Demonstration Project by Willett Kempton College of Earth, Ocean, and Environment Department of Electrical and Computer Engineering Center for Carbon-free Power Integration University of Delaware 2010 Smart Grid Peer Review Office of Electricity Delivery and Energy Reliability, DOE Purpose & Objectives * Create the Gri d I ntegrated V ehi cl e (GIV), then operate, permit, and test it * A nalyze vehicle use, our vehicles & large data base of 400 vehicles daily driving * A nalyze market for EVs and V2G * Develop softw are to dispatch pow er from vehicles -> Operate in real time! * Tw o-year aw ard, $750,000, close N ov '10 Activities (2-year) * Research: Driving patterns; economic value; self-learning trip predictions * Industrial: Facilitate EV retrofit operation

410

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

UIC Class VI GS Technical UIC Class VI GS Technical Guidance Update DOE Carbon Storage R&D Project Review Meeting - Pittsburgh, PA August 21- 23, 2012 Bruce J. Kobelski, GS Team Leader Office of Ground Water and Drinking Water Washington, DC U.S. Environmental Protection Agency UIC Well Classification Well Class Function Inventory Class I Hazardous industrial and municipal wastes 650 Class II Fluids related to oil and gas production 151,000 Class III Solution mining (e.g. salt, uranium) 21,400 Class IV Shallow hazardous waste - only used for remediation activities 24 sites Class V Shallow injection of nonhazardous fluids 500,000 - 650,000 (Estimate - precise inventory is unknown) Class VI Geologic sequestration of carbon dioxide N/A 2 UIC WELL CLASSES 3 U.S. Environmental Protection Agency

411

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of State Governments of State Governments Northeast High Level Radioactive Waste Transportation Task Force U.S. Department of Energy Transportation External Coordination Working Group Meeting April 21-23, 2004 Dr. Edward Wilds, Jr. Co-Chair, NE Task Force Organization: The Northeast High Level Radioactive Waste Transportation Task Force: Composed of representatives appointed by the Governor of each member state within the northeast region Establishes subcommittees as necessary to complete work projects and to analyze specific transportation issues (such as the WIPP Rail PIG working group) Representation on the TEC topic groups and attend TEC and other DOE meetings Role Meet twice a year to discuss and resolve regional issues related to DOE transportation activities

412

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Krummel, Jim Kuiper, Robert Sullivan, and Kevin Hlava Krummel, Jim Kuiper, Robert Sullivan, and Kevin Hlava Environmental Science Division Argonne National Laboratory August 16, 2011 Developing Renewable Energy Resources and Associated Infrastructure: Location, Location, Location Spatial Data and Analysis Leads to More Informed Decision-making * Provides the context for issues that are fundamentally location based * Provides stakeholders with the same information used by project decision-makers * Allows one to visualize a problem * Critical input/output data for models of physical, social, and biological systems * Can now be delivered over the web in highly interactive formats 3 Argonne National Laboratory - Environmental Science Division * Enhanced visualization of results * Cumulative analysis * Watershed-based management

413

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Large-Scale Energy Storage Technology Overviews Large-Scale Energy Storage Technology Overviews UltraBattery - Grid Storage UPDATE CONFERENCE - 2010 Project Partners: John Wood (Ecoult) East Penn Manufacturing Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy through National Energy Technology Laboratory Investment and Development Program for UltraBattery and Advanced Lead Acid Technology Complete Solutions for 10's kW-100MW Grid Storage Regulation Renewable Energy Firming Load Levelling (Peak Shaving) T&D Deferral Performance Characterization (15 year) UB Product Breakthrough and Development Application specific Longevity Characterization and Optimisation MW Scale solution Implementation and demonstration with partners Industry Rollout EPM Smart Grid Demonstration 2006 2007

414

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maine Yankee Reactor Vessel Maine Yankee Reactor Vessel Removal & Barge Transport U.S. Department of Energy TEC Working Group April 4-5, 2005 Phoenix, Arizona Ted Feigenbaum Maine Yankee President & CEO The Maine Yankee Reactor Pressure Vessel Project Ingredients for Success Solid Planning + Flawless Implementation + Extensive Communication = . . . Success The reactor pressure vessel (RPV) internals, before segmentation. 2001 The segmented RPV internals. 2001 The arrival of the RPV shipping container cover at Maine Yankee. May 2001 Vessel lift from Containment for transfer to the shipping container. August 2002 Vessel transfer to the shipping container. August 2002 The empty RPV shipping container and skid in the back yard. 2001 The shipping container, staged in the Containment

415

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Background and Introduction Background and Introduction Acknowledgments This research was supported in part by the Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards under the EERE Fuel Cell Technologies Program administered by the Oak Ridge Institute for Science and Education (ORISE) for the DOE. ORISE is managed by the Oak Ridge Associated Universities (ORAU) under DOE contract number DE-AC05-06OR23100. Modified Physisorption-Based Materials for the Ambient Temperature Storage of Molecular H 2 Impact This project aims to synthesize, characterize and evaluate a new class of materials, namely metal- and cluster-modified ultra-high area diamond network materials. If fully successful, these materials are potentially capable of satisfying, and even exceeding, the U.S. DOE's 2015 excess gravimetric and

416

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2008 2008 1 Jim Eyer - Distributed Utility Associates, Inc. 17 Electric Utility-Related Electricity Storage Benefits, Featuring T&D Deferral DOE Peer Review September 2008 - Washington D.C. by Distributed Utility Associates, Inc. Jim Eyer, Senior Analyst jim@dua1.com This project is part of the Energy Storage Collaboration between the California Energy Commission (CEC) and the Energy Storage Systems Program of the U.S. Department of Energy (DOE/ESS) and managed by Sandia National Laboratories (SNL). Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration, under contract DE-AC04-94AL85000. Funding: Congressional ear-mark. DOE Peer Review 2008

417

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Laboratory Mentor-Protégé Program Business Success Stories Presented by Cassandra McGee Stuart ORNL Small Business Programs Office May 23, 2013 2 Presentation name Today, ORNL is DOE's largest science and energy laboratory 2 Managed by UT-Battelle for the U.S. Department of Energy $1.65B budget World's most intense neutron source 4,400 employees World-class research reactor 3,000 research guests annually $500M modernization investment Nation's largest materials research portfolio Most powerful open scientific computing facility Nation's most diverse energy portfolio Managing billion-dollar U.S. ITER project 3 Managed by UT-Battelle for the U.S. Department of Energy ORNL is managed by UT-Battelle, LLC * A 65-year relationship with DOE

418

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

The EMS Energy Institute and and Department of Energy and Mineral Engineering, The EMS Energy Institute and and Department of Energy and Mineral Engineering, The Pennsylvania State University 209 Academic Projects Building, University Park, PA 16802 Xiaoliang Ma*, Xiaoxing Wang, and Chunshan Song* Concept of MBS Acknowledgment  U.S. Department of Energy, NETL through DOE Grant DE- FC26-08NT0004396.  Pennsylvania Energy Development Authority (PEDA) under Grant PG050021.  U.S. Office Naval Research through OND N00014-08-1-0123 A New Generation of "Molecular Basket" Sorbents (MBS) for Separation of CO 2 and H 2 S from Various Gas Streams Wide Applications * Biogas * Landfill Gas * Coal/biomass Gasification Gas * Natural Gas * Reformate * Syngas Gas cleaning up:  Sorption Capacity of MBS 10 µm 1 µm *In comparison with industrial absorbents and state-of-the-art adsorbents

419

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPA and Federal Hydropower APPA and Federal Hydropower Will Coffman Senior Government Relations Representative American Public Power Association Atlanta, Georgia Oct. 20, 2013 Overview * APPA, the American Public Power Association (APPA): trade association for the more than 2,000 community-owned, not-for- profit electric utilities providing service to 47 mil Americans in 49 states. Many of our members purchase power from Corps projects - Approx. 1,200 public power systems and rural electric cooperatives in 33 states. * We, along with NRECA, advocate for federal hydro customers in Congress and with the Administration Areas of Advocacy 1. Congress - Provide background on PMA customer issues to Committees of jurisdiction * Senate: Energy and Natural Resources * House: Natural Resources

420

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radiation-induced Ductility Radiation-induced Ductility Enhancement in Amorphous Fe and Al2O3+TiO2 Nano-structured Coatings under Fast Neutrons Nick Simos, BNL Co-PIs: Dr. Simerjeet Gill, BNL Prof. T. Tsakalakos and Dr. K. Akdogan Nano Structured Materials Group Nano Structured Materials Group Department of Materials Science & Engineering Department of Materials Science & Engineering Rutgers University Webinar - August 20, 2013 Project Description  Explore the protective performance of Fe-based amorphous and ceramic (Al 2 O 3 and Al 2 O 3 +TiO 2 ) nanostructured coatings under extreme temperatures, neutron irradiation and aggressively corrosive environments  Study the effects of fast neutrons  Study resistance to ductility loss of the composite structures (coating + substrate) and

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

by the US DOE Office of Science, Office of High Energy Physics, by the US DOE Office of Science, Office of High Energy Physics, via the SBIR & SciDAC programs; and also by ASCR, Nuclear Physics & Basic Energy Sciences via the SBIR program; used NERSC supercomputing center. Large Scale Computing and Storage Requirements for High Energy Physics (An HEP/ASCR/NERSC Workshop) Rockville, MD, November 12, 2009 Finite Difference Time Domain (FDTD) Electromagnetic Modeling Efforts of the ComPASS SciDAC (and related SBIR) Projects J.R. Cary, 1,2 K. Amyx, 1 T. Austin, 1 D. Bruhwiler, 1 B. Cowan, 1 P. Messmer, 1 P. Mullowney, 1 K. Paul, 1 P. Stoltz, 1 D. Smithe, 1 S. Veitzer 1 & G. Werner 1,2 1. Tech-X Corp. 2. University of Colorado Motivating Science & Applications * Scientific objectives for the next 3-5 years: rapid high-fidelity simulation &

422

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Temperature Swing Adsorption using Temperature Swing Adsorption using Polymer/Supported Amine Composite Hollow Fibers Christopher W. Jones, Yoshiaki Kawajiri, William J. Koros, Matthew Realff, David S. Sholl Georgia Institute of Technology Katherine Searcy Trimeric Inc. Ryan Lively, Algenol Biofuels Post-Combustion Sorbent-Based Capture 2013 NETL CO 2 Capture Technology Meeting Sheraton Station Square, Pittsburgh, PA Monday, July 8, 2013 DOE Award #: DE-FE0007804 Budget: DOE contribution: Year 1: $ 691,955 Year 2: $ 847,672 Year 3: $ 847,006 Total: $2,386,633 (79%) Cost Share Partners: GE Energy: $ 420,000 Algenol Biofuels: $ 183,900 Southern Company: $ 33,147 Total: $ 637,047 (21%) Total Budget: $3,023,680 Project Performance Dates - October 2011 to September 2014

423

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Arkansas Power Electronics International, Inc. Arkansas Power Electronics International, Inc. DOE Peer Review November 2-3, 2006 Marcelo Schupbach, Ph.D. Senior Engineer APEI, Inc. 535 Research Center Blvd. Fayetteville, AR 72701 Phone: (479)-443-5759 Email: marcelo@apei.net Website: www.apei.net High Temperature and High Power Density SiC Power Electronic Converters Energy Storage Systems Program 2 Overview * APEI, Inc. Corporate Status * Broader Impact of SiC-based Power Converter * DOE Energy Storage System Program Phase I SBIR - SBIR Topic: Wide Band Gap Power Converter Application - APEI's Goals - Phase I Accomplishments * DOE Energy Storage System Program Phase II SBIR - APEI's Goals - Research Team and Partners - Project Status Energy Storage Systems Program 3 APEI, Inc. Mission Statement We are a small business dedicated to

424

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

oilgas.nd.gov oilgas.nd.gov 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701)328-8020 Kevin C. Connors Carbon Capture and Storage Supervisor kcconnors@nd.gov NDIC - DMR Oil and Gas Division Interstate Oil and Gas Compact Commission Plains CO 2 Reduction Partnership Task Force on Carbon Geologic Storage Phase III Project Guidance for States and Provinces On Operational and Post-Operational Liability NDIC - DMR Oil and Gas Division NDIC - DMR Oil and Gas Division 1. It is the public interest to promote geologic storage of CO 2 in order to reduce anthropogenic emissions. 2. The States pore space should be regulated and managed as a resource under the resource management philosophy as opposed to a waste disposal regulatory framework.

425

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Anthony Illingworth Anthony Illingworth Ewan O'Connor University of Reading, UK Proposal for collaboration between Cloudnet and ARM Overview * What is Cloudnet? - European project that achieved systematic evaluation of 7 models over 4 ARM-like sites in Europe for a multi-year period - European Union funding ended in 2005; since then small amounts of funding obtained to process AMF data and to implement the Cloudnet processing system at Lindenberg for German model evaluation * Proposal to ARM's "Instrument support" fund - Apply Cloudnet processing to 10+ years of ARM & European data - Systematically evaluate all models available over all sites worldwide - Provide ARM with a working system to evaluate models in real time, essential if ARM data are to lead to model improvements

426

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mayor Antonio Villaraigosa Mayor Antonio Villaraigosa When Cities Lead: The Los Angeles Experience Mayor Antonio R. Villaraigosa Mayor Antonio R. Villaraigosa Mayor Antonio R. Villaraigosa -45% -40% -35% -30% -25% -20% -15% -10% -5% 0% Municipal Citywide 2004 2010 2013* 2020* "Green LA" 2030 Goal (*Projected) Reduction in Total Greenhouse Gas Emissions Percentage Change from 1990 Baseline Mayor Antonio R. Villaraigosa Pine Tree The nation's largest municipally owned wind farm Mayor Antonio R. Villaraigosa 0% 5% 10% 15% 20% 25% 2005 2006 2007 2008 2009 2010 2010 Goal Total Electricity Generated from Renewables Percentage Share Mayor Antonio R. Villaraigosa Port of LA: Clean Trucks Program Mayor Antonio R. Villaraigosa -80% -70% -60% -50% -40% -30% -20% -10% 0% Nitrogen Oxides Sulfur Oxides

427

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Objectives Testing Objectives * Qualitatively demonstrate leaching and ultrafiltration processes, equipment design and process control strategies * Obtain data to improve process model projections for leaching and ultrafiltration - Develop scaling factors to form link between laboratory-scale and engineering-scale test results Process Flowsheets * Baseline: caustic leaching in UF feed preparation vessels - Caustic added directly to as-received feed (3-8 wt% solids) * Alternative: caustic leaching in UF feed vessel - Caustic added after initial solids concentration to 20 wt% * All other process steps conducted in the UF feed vessels. PEP Flow Diagram Scaling Considerations * 1/4.5-scale facility: linear dimensions * PJM mixing - Newtonian slurry: power/volume - Non-newtonian: plant velocity

428

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

nd U.S.-China CO2 Emissions Control Science & Technology Symposium nd U.S.-China CO2 Emissions Control Science & Technology Symposium Shenhua CTL (Clean Coal) Projects and CO 2 Sequestration Ren Xiangkun China Shenhua Coal Liquefaction Co., Ltd May 29th, 2008 2nd U.S.-China CO2 Emissions Control Science & Technology Symposium Table of Contents * Overview of Sino-US joint research program * Coal-to-liquids (CTL) development in China * Shenhua direct coal liquefaction (DCL) plant * CO 2 sequestration potential of Shenhua DCL plant * Conclusions: CO 2 vs. Prospect of CTL 2nd U.S.-China CO2 Emissions Control Science & Technology Symposium US-China Clean Energy Protocol * First meeting between Shenhua and WVU in 2002 * MOU signed by WVU and CSCLC in 2004 * WVU participation funded by DOE since 2003 with Shenhua cost sharing support in China

429

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

OPEN INNOVATION OPEN INNOVATION COMMUNICATION: Bringing Innovation to the Surface(tm) S&T Innovation Strategy * PPG Strategic Direction: Driving Innovation & New Technologies ► Our Strategies section from PPG's blueprint * PPG Innovation Model: Identifying SBU-aligned Growth Ideas Moving Successful Projects into the Pipeline ► R&D conducts test drills and follows work to commercialization * Open Innovation - Part of Innovation Strategy Copyright 2012 PPG Industries, Inc. 2 Open Innovation Definition *"Open innovation is a paradigm that assumes that firms can and should use external ideas as well as internal ideas, and internal and external paths to market, as the firms look to advance their technology." Chesbrough, H.W. (2003)

430

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Management Advisory Council (BMAC) Quality Supplier Working Group (QSWG) Master Approved Suppliers List (MASL) Project Tony Cannon - QSWG Co-Lead National Security Technologies (NSTec) LLC Contractor to the U. S. Department of Energy March 16, 2011 2 The Quality Supplier Working Group (QSWG) was established in September 2009, out of the Business Management Advisory Council (BMAC). The BMAC is a National Nuclear Security Administration (NNSA) council consisting of the NNSA Chief Operating Officer (COO), Chief Operating Officers or equivalent from each M&O contractors, NNSA Senior Procurement Executive, NNSA Program and Site Office representatives. Purpose - Is to ensure improved efficiencies and economies in the Nuclear Security Enterprise (NSE) throughout all business functions.

431

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Area: Resource Adequacy Area: Resource Adequacy Reliability and Markets: Project 3A Long-term Planning and Investment for Transmission and Generation Tim Mount, Cornell University Fernando Alvarado, U. of Wisconsin 18 October 2006 Arlington, VA OE Visualization and Controls Peer Review Page 2 2 OUTLINE Maintaining Generation Adequacy Missing Money and Capacity Markets. Co-Optimization in Markets for Energy and Reserves. Testing the Forward Capacity Market in New England. Economic Cost of Congestion Increasing Transmission Congestion due to Voltage. Modeling the Financial Risk of Spatial Price Differences. New Responsibilities for FERC in EPAct05. Summary and Outreach to Stakeholders Publications Collaboration with System Operators Next steps Page 3 3 Source: "2005 NERC Long-Term Reliability Assessment", Fig. 4

432

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

End-to End Business Model for End-to End Business Model for Retail Aggregation of Responsive Load to Produce Wholesale Demand Side Resources Shmuel S. Oren University of California, Berkeley CERT Project Review Meeting Cornell University August, 6-7, 2013 Drivers: Variability and Uncertainty of Renewables + Ramping Challenges 0 wind power output (MW) 24 48 72 96 120 144 168 load (MW) hour wind power load Challenges and Options Mobilize load flexibility and bring about a paradigm shift from "generation following load" to "load following available supply" Need business model and economic paradigm for a utility or third party aggregator to bridge the gap between wholesale commodity market and retail service Prices vs. Quantities  Treating retail electricity as a spot commodity: Provide real

433

PowerPoint Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assistance to ISO's and Grid Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Brendan Kirby - ORNL Chuck Goldman - LBNL Michael Kintner-Meyer - PNNL October 2006 Washington, D.C. OE Visualization and Controls Peer Review Programmatic Goal Load As a Resource : One of four program areas within the Office of Electricity's Transmission Reliability Program: - "This activity evaluates the capability of load to respond to price signals to improve grid reliability and market efficiency." This work includes the "Potential of load to provide ancillary services." Project demonstrates and promotes the use of responsive load to provide ancillary services; helps ISOs and grid operators understand the resource and how best to apply it.

434

Building The last mile'  

SciTech Connect

Utilities may want to leverage the multibillion-dollar investment cable television is about to make. Virtually every utility has corporate objectives to focus more on the customer and change the way the customer is viewed. Utility supply strategy has been shifting away from building large, expensive power plants to making smaller investments with flexible options that can be adjusted to suit future conditions. This strategy is requisite to helping utilities keep and build their share of the market. One result is that utilities and regulators have adopted the concept of demand-side management (DSM) with enthusiasm. What's more, the last 10 years have brought new utility initiatives to explore customer value-oriented pricing structures that recognize the varying cost of production. These DSM opportunities and pricing initiatives require utilities to communicate with customers and help them manage their electricity use. New DSM programs that rely on communications technology include: (1) Providing real-time price signals for electricity-and eventually gas and water; (2) Implementing a direct- or shared-load control program for peak clipping or valley filling by interacting with properly equipped smart appliances; (3) Providing beyond-the-meter value-added services for residential customers, such as weather monitoring, video communications, home comfort automation, appliance monitoring and diagnostics, and energy efficiency tips; and (4) Obtaining detailed data on customers' electricity use patterns to develop new DSM programs. One action by the utility industry will determine whether this strategic vision is achieved: the establishment of a two-way, user-friendly, voice, data, and video communication path to the customer from the utility.

Gupta, P.C.; Bringenberg, J.

1994-03-15T23:59:59.000Z

435

Tazimina Hydroelectric Project, Iliamna, Alaska Final Technical and Construction Cost Report  

DOE Green Energy (OSTI)

The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. These communities have a combined population of approximately 600 residents. There is no direct road connection from these villages to larger population centers. Electric power has been generated by INNEC since 1983 using diesel generators located in the community of Newhalen. Fuel for these generators was transported up the Kvichak River, an important salmon river, and across Iliamna Lake. In dry years the river is low and fuel is flown into Iliamna and then trucked five miles into Newhalen. The cost, difficult logistics and potential spill hazard of this fuel was a primary reason for development of hydroelectric power in this area. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

HDR Alaska, Inc.

1998-11-01T23:59:59.000Z

436

PROJECTIZING AN OPERATING NUCLEAR FACILITY  

SciTech Connect

This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully accomplish deactivation. This concept had to allow for continued operations in FB Line until 2005, while providing distinct task-oriented teams for deactivation of the FCC. Facility workers, always the most knowledgeable about any facility, were integral parts of the project team. The team defined the scope, developed a bottoms-up estimate, reorganized personnel to designated project teams, and developed a baseline schedule with about 12,000 activities. Training was implemented to prepare the facility workers to use project management tools and concepts, which were to execute the project, coordinate activities and track progress. The project budget was estimated at $579 million. The team completed F Canyon and FB Line deactivation in August 2006, four months ahead of schedule and under budget.

Adams, N

2007-07-08T23:59:59.000Z

437

Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1995 Annual Report.  

DOE Green Energy (OSTI)

During the 1995 - 96 project period, four new habitat enhancement projects were implemented under the Umatilla River Basin Anadromous Fish Habitat Enhancement Project by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) in the upper Umatilla River Basin. A total of 38,644 feet of high tensile smooth wire fencing was constructed along 3.6 miles of riparian corridor in the Meacham Creek, Wildhorse Creek, Greasewood Creek, West Fork of Greasewood Creek and Mission Creek watersheds. Additional enhancements on Wildhorse Creek and the lower Greasewood Creek System included: (1) installation of 0.43 miles of smooth wire between river mile (RM) 10.25 and RM 10.5 Wildhorse Creek (fence posts and structures had been previously placed on this property during the 1994 - 95 project period), (2) construction of 46 sediment retention structures in stream channels and maintenance to 18 existing sediment retention structures between RM 9.5 and RM 10.25 Wildhorse Creek, and (3) revegetation of stream corridor areas and adjacent terraces with 500 pounds of native grass seed or close species equivalents and 5,000 native riparian shrub/tree species to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. U.S. Fish and Wildlife Service (USFWS), Bureau of Indian Affairs (BIA) and Environmental Protection Agency (EPA) funds were cost shared with Bonneville Power Administration (BPA) funds, provided under this project, to accomplish habitat enhancements. Water quality monitoring continued and was expanded for temperature and turbidity throughout the upper Umatilla River Watershed. Physical habitat surveys were conducted on the lower 13 river miles of Wildhorse Creek and within the Greasewood Creek Project Area to characterize habitat quality and to quantify various habitat types by area.

Shaw, R.Todd

1996-05-01T23:59:59.000Z

438

Western LNG project - Project summary  

Science Conference Proceedings (OSTI)

The Western LNG Project is a major new undertaking involving the liquefaction of conventional natural gas from the Western Canadian Sedimentary Basin at a plant on the British Columbia north coast. The gas in its liquid form will be shipped to Japan for consumption by utility companies. The Project represents a new era in gas processing and marketing for the Canadian natural gas industry.

Forgues, E.L.

1984-02-01T23:59:59.000Z

439

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

440

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

442

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

443

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

444

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

445

Fifteenmile Creek Riparian Buffers Project, Annual Report 2002-2003.  

DOE Green Energy (OSTI)

This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteenmile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. During this second year of the project, 11 buffer contracts were implemented on 10.9 miles of stream. Buffer widths averaged 132 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.6 years. The total value of contracts established this year is $666,121 compared with $71,115 in Bonneville Power Administration (BPA) contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. In addition, specific outreach efforts targeting the orchard areas of the county began to bear fruit with orchardists sign-ups as the project year ended. Progress this second year of project includes only work accomplished in the Fifteenmile subbasin. A similar but separate effort to implement buffers in the Columbia Plateau Province was initiated during the year under project number 2002-019-00. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion.

Graves, Ron

2004-02-01T23:59:59.000Z

446

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 HINS R&D: a possible Project X Front End Frequency 325 MHz Total length ~ 55 m SSR1 (β=0.22) SSR2 (β=0.4) RT -CHSR MEBT RFQ IS W (MeV) 2.5 0.050 60 30 10 Beam Line Elements: 19 Conventional RT Cavities 29 SC Spoke Cavities and 3 Cryomodules 42 SC Focusing Solenoids RF Power Elements: one 325 MHz Klystron/Modulator one 400 kW RFQ FVM 19 ~20 kW FVM/Fast Tuning for RT Section 29 ~20-120 kW FVM/Fast Tuning for SC Section Power Supplies, quench protection, beam diagnostic,.. Fermilab 2 * HINS R&D Phase: Proof of innovative approach to high intensity beam acceleration ! - 2007-2011/12 R&D period - Prove, Develop & Bui ld Front-End in Meson Bldg. at 325 MHz (0-60 MeV) since much of the technical complexity is in the FE Mechanical/RF Systems * Demonstrate for the first time

447

Category:Smart Grid Investment Grant Projects | Open Energy Information  

Open Energy Info (EERE)

Investment Grant Projects Investment Grant Projects Pages in category "Smart Grid Investment Grant Projects" The following 98 pages are in this category, out of 98 total. A ALLETE Inc., d/b/a Minnesota Power Smart Grid Project American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project Atlantic City Electric Company Smart Grid Project Avista Utilities Smart Grid Project B Baltimore Gas and Electric Company Smart Grid Project Black Hills Power, Inc. Smart Grid Project Black Hills/Colorado Electric Utility Co. Smart Grid Project Burbank Water and Power Smart Grid Project C CenterPoint Energy Smart Grid Project Central Lincoln People's Utility District Smart Grid Project Central Maine Power Company Smart Grid Project Cheyenne Light, Fuel and Power Company Smart Grid Project

448

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

449

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

450

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

451

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of CO 2 Exposed Wells to Predict Long Term Leakage through the Development of an Integrated Neural- Genetic Algorithm Project DE FE0009284 Boyun Guo, Ph.D. University of...

452

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

453

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

454

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

455

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

456

LUCF Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

RZWR'HVLJQDQG RZWR'HVLJQDQG +RZWR'HVLJQDQG ,PSOHPHQW&DUERQ ,PSOHPHQW&DUERQ 0HDVXULQJDQG0RQLWRULQJ 0HDVXULQJDQG0RQLWRULQJ $.WLYLWLHVIRU/8&) $.WLYLWLHVIRU/8&) 3URMH.WV 3URMH.WV Sandra Brown Winrock International sbrown@winrock.org Winrock International 2 3URMH.WGHVLJQLVVXHV 3URMH.WGHVLJQLVVXHV z Baselines and additionality z Leakage z Permanence z Measuring and monitoring z Issues vary with projects in developed versus developing countries Winrock International 3 /HDNDJH /HDNDJH z Leakage is the unanticipated loss or gain in carbon benefits outside of the project's boundary as a result of the project activities-divide into two types: - Primary leakage or activity shifting outside project area - Secondary leakage or market effects due to

457

Project 265  

NLE Websites -- All DOE Office Websites (Extended Search)

The goal of this project is to develop an on-line instrument using multi- wavelength lasers that is capable of characterizing particulate matter (PM) generated in fossil energy...

458

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

"Carbonsheds" as a Framework for Optimizing US CCS Pipeline Transport on a Regional to National Scale DOE-ARRA Project Number DE-FE0001943 Lincoln Pratson Nicholas School of the...

459

Project 114  

NLE Websites -- All DOE Office Websites (Extended Search)

Prototech Company SRI International Kellogg, Brown, and Root ChevronTexaco Sd-Chemie, Inc. COST Total Project Value 20,320,372 DOENon-DOE Share 15,326,608 4,993,764...

460

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Laboratory U.S. Department of Energy Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

462

Project 134  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Goal To demonstrate a "whole plant" approach using by-products from a coal-fired power plant to sequester carbon in an easily quantifiable and verifiable form. Objectives...

463

MANHATTAN PROJECT  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy traces its origins to World War II and the Manhattan Project effort to build the first atomic bomb. As the direct descendent of the Manhattan Engineer District, the...

464

Project 310  

NLE Websites -- All DOE Office Websites (Extended Search)

carbohydrate generated from agricultural enterprises in the U.S., such as corn wet-milling. This project is studying the production of a suite of specialty chemicals by...

465

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

G., 2011, Design and package of a 14CO2 field analyzer: the Global Monitor Platform (GMP). Proceedings of SPIE, v 8156, p. 81560E 17 DOE-NETL PROJECT REVIEW MEETING 08-21-2012...

466

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

467

Project 297  

NLE Websites -- All DOE Office Websites (Extended Search)

of this project is to utilize pure oxygen at a feed rate of less than 10% of the stoichiometric requirement in demonstrating the use of oxygen-enhanced combustion in meeting...

468

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D...

469

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D....

470

Revisiting Insights from Three Mile Island Unit 2 Postaccident Examinations and Evaluations in View of the Fukushima Daiichi Accident  

Science Conference Proceedings (OSTI)

The Three Mile Island Unit 2 (TMI-2) accident, which occurred on March 28, 1979, led industry and regulators to enhance strategies to protect against severe accidents in commercial nuclear power plants. Investigations in the years after the accident concluded that at least 45% of the core had melted and that nearly 19 tonnes of the core material had relocated to the lower head. Postaccident examinations indicate that about half of that material formed a solid layer near the lower head and above it was a layer of fragmented rubble. As discussed in this paper, numerous insights related to pressurized water reactor accident progression were gained from postaccident evaluations of debris, reactor pressure vessel (RPV) specimens, and nozzles taken from the RPV. In addition, information gleaned from TMI-2 specimen evaluations and available data from plant instrumentation were used to improve severe accident simulation models that form the technical basis for reactor safety evaluations. Finally, the TMI-2 accident led the nuclear community to dedicate considerable effort toward understanding severe accident phenomenology as well as