Powered by Deep Web Technologies
Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

MHK Projects/Twelve Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Twelve Mile Point Project Twelve Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9177,"lon":-89.9307,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

2

MHK Projects/Fortyeight Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Fortyeight Mile Point Project Fortyeight Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0447,"lon":-90.6659,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

3

MHK Projects/Thirty Five Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Thirty Five Mile Point Project Thirty Five Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0146,"lon":-90.4774,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

4

MHK Projects/Eighty One Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Eighty One Mile Point Project Eighty One Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.16,"lon":-91.0056,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

5

New York Nuclear Profile - Nine Mile Point Nuclear Station  

U.S. Energy Information Administration (EIA) Indexed Site

Nine Mile Point Nuclear Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

6

51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development  

Broader source: Energy.gov [DOE]

51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

7

EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass  

Broader source: Energy.gov (indexed) [DOE]

EA-1925: Midnight Point and Mahogany Geothermal Exploration EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon SUMMARY This EA evaluates Ormat Nevada, Inc.'s (Ormat's) proposed geothermal project consists of drilling up to 16 wells for geothermal exploration approximately 70 miles southeast of Bend, Oregon and 50 miles northwest of Burns, Oregon just south of U.S. Highway 20. The proposed project includes three distinct drilling areas. Up to three wells would be drilled on lands managed by the Bureau of Land Management (BLM) Prineville District (Mahogany), up to ten wells would be drilled on lands managed by the BLM Burns District (Midnight Point), and up to three wells would be drilled on

8

EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass  

Broader source: Energy.gov (indexed) [DOE]

5: Midnight Point and Mahogany Geothermal Exploration 5: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon EA-1925: Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon SUMMARY This EA evaluates Ormat Nevada, Inc.'s (Ormat's) proposed geothermal project consists of drilling up to 16 wells for geothermal exploration approximately 70 miles southeast of Bend, Oregon and 50 miles northwest of Burns, Oregon just south of U.S. Highway 20. The proposed project includes three distinct drilling areas. Up to three wells would be drilled on lands managed by the Bureau of Land Management (BLM) Prineville District (Mahogany), up to ten wells would be drilled on lands managed by the BLM Burns District (Midnight Point), and up to three wells would be drilled on

9

EA-1985: Virginia Offshore Wind Technology Advancement Project (VOWTAP), 24 nautical miles offshore of Virginia Beach, Virginia  

Broader source: Energy.gov [DOE]

DOE is proposing to fund Virginia Electric and Power Company's Virginia Offshore Wind Technology Advancement Project (VOWTAP). The proposed VOWTAP project consists of design, construction and operation of a 12 megawatt offshore wind facility located approximately 24 nautical miles off the coast of Virginia Beach, VA on the Outer Continental Shelf.

10

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

11

BP Cherry Point Congeneration Project  

Broader source: Energy.gov (indexed) [DOE]

REVISED 404 (B) (1) REVISED 404 (B) (1) ALTERNATIVES ANALYSIS BP Cherry Point Cogeneration Project Prepared for: BP West Coast Products, LLC Revised June 29, 2004 1501 Fourth Avenue, Suite 1400 Seattle, WA 98101-1616 (206) 438-2700 33749546.05070 i TABLE OF CONTENTS Page 1.0 I NT RODUCTI ON ................................................................................................................... 1 2.0 P URPOSE AND NEE D .......................................................................................................... 1 2.1 RELIABILITY .................................................................................................... 1 2.2 COST-EFFECTIVENESS ................................................................................... 3 2.3 SIZE OF FACILITY............................................................................................

12

BP Cherry Point Cogeneration Project  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers August 2004 EFSEC Washington State Energy Facility Site Evaluation Council July 12, 2004 Dear Reader: Enclosed for your reference is the abbreviated Final Environmental Impact Statement (FEIS) for the proposed BP Cherry Point Cogeneration Project. This document is designed to correct information and further explain what was provided in the Draft Environmental Impact Statement (DEIS). The proponent, BP West Coast Products, LLC, has requested to build a 720-megawatt gas-fired combined cycle cogeneration facility in Whatcom County, Washington, and interconnect this facility into the regional

13

Transformer failure and common-mode loss of instrument power at Nine Mile Point Unit 2 on August 13, 1991  

SciTech Connect (OSTI)

On August 13, 1991, at Nine Mile Point Unit 2 nuclear power plant, located near Scriba, New York, on Lake Ontario, the main transformer experienced an internal failure that resulted in degraded voltage which caused the simultaneous loss of five uninterruptible power supplies, which in turn caused the loss of several nonsafety systems, including reactor control rod position indication, some reactor power and water indication, control room annunciators, the plant communications system, the plant process computer, and lighting at some locations. The reactor was subsequently brought to a safe shutdown. Following this event, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to the site to determine what happened, to identify the probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents and the team's findings and conclusions. 59 figs., 14 tabs.

Not Available

1991-10-01T23:59:59.000Z

14

EIS-0266: Glass Mountain/Four Mile Hill Geothermal Project, California  

Broader source: Energy.gov [DOE]

The EIS analyzes BPA's proposed action to approve the Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project).

15

Midnight Point Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Midnight Point Geothermal Project Midnight Point Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Midnight Point Geothermal Project Project Location Information Coordinates 43.548333333333°, -119.97611111111° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.548333333333,"lon":-119.97611111111,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

16

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 EFSEC Washington State Energy Facility Site Evaluation Council September 5, 2003 Dear Reader: Enclosed for your review is the Draft Environmental Impact Statement (DEIS) for the proposed BP Cherry Point Cogeneration Project. The proponent, BP West Coast Products, LLC, has requested to build a 720-Megawatt Gas-Fired Combined Cycle Cogeneration Facility in Whatcom County, Washington, and interconnect this facility into the regional power transmission grid. To integrate the new power generation into the transmission grid, Bonneville Power Administration (Bonneville) may need to re-build 4.7 miles of an existing 230-kV

17

How many electric miles do Nissan Leafs and Chevrolet Volts in The EV Project travel?  

SciTech Connect (OSTI)

This paper presents travel statistics and metrics describing the driving behavior of Nissan Leaf and Chevrolet Volt drivers in the EV Project. It specifically quantifies the distance each group of vehicles drives each month. This paper will be published to INL's external website and will be accessible by the general public.

John Smart

2014-05-01T23:59:59.000Z

18

EIS-0153: Niagara Import Point Project  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission prepared this statement to assess the environmental impacts of the proposed Niagara Import Point project that would construct an interstate natural gas pipeline to transport gas from Canada and domestic sources to the Northeastern United States market. The U.S. Department of Energy's Office of Fossil Energy was a cooperating agency during statement development and adopted this statement on 6/15/1990.

19

MHK Projects/Jackson Point Project | Open Energy Information  

Open Energy Info (EERE)

Jackson Point Project Jackson Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.264,"lon":-91.5854,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

20

MHK Projects/Hope Field Point Project | Open Energy Information  

Open Energy Info (EERE)

Hope Field Point Project Hope Field Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.1552,"lon":-90.0716,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

MHK Projects/College Point Project | Open Energy Information  

Open Energy Info (EERE)

Point Project Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30,"lon":-90.8357,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

22

MHK Projects/Duncan Point Project | Open Energy Information  

Open Energy Info (EERE)

Duncan Point Project Duncan Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.3743,"lon":-91.2403,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

23

MHK Projects/Ashley Point Project | Open Energy Information  

Open Energy Info (EERE)

Ashley Point Project Ashley Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.8354,"lon":-90.432,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

24

MHK Projects/Williams Point Project | Open Energy Information  

Open Energy Info (EERE)

Point Project Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.4755,"lon":-89.5308,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

25

MHK Projects/Plum Point Project | Open Energy Information  

Open Energy Info (EERE)

Point Project Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.735,"lon":-89.9154,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

26

MHK Projects/Anconia Point Project | Open Energy Information  

Open Energy Info (EERE)

Anconia Point Project Anconia Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.2952,"lon":-91.168,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

27

MHK Projects/Brilliant Point Project | Open Energy Information  

Open Energy Info (EERE)

Point Project Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0835,"lon":-90.912,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

28

MHK Projects/Manchac Point Project | Open Energy Information  

Open Energy Info (EERE)

Manchac Point Project Manchac Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.3421,"lon":-91.1832,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

29

Evaluation of nuclear facility decommissioning projects: Summary status report: Three Mile Island Unit 2. Radioactive waste and laundry shipments  

SciTech Connect (OSTI)

This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 through April 19, 1987. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

Doerge, D. H.; Haffner, D. R.

1988-06-01T23:59:59.000Z

30

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor defueling and disassembly. Summary status report. Volume 3  

SciTech Connect (OSTI)

This document summarizes information relating to the preparations for defueling the Three Mile Island Unit 2 (TMI-2) reactor and disassembly activities being performed concurrently with decontamination of the facility. Data have been collected from activity reports, reactor containment entry records, and other sources and entered in a computerized data sysem which permits extraction/manipulation of specific data which can be used in planning for recovery from a loss of coolant event similar to that experienced at TMI-2 on March 28, 1979. This report contains summaries of man-hours, manpower, and radiation exposures incurred during the period of April 23, 1979 to April 16, 1985, in the completion of activities related to preparation for reactor defueling. Support activities conducted outside of radiation areas are not included within the scope of this report. Computerized reports included in this document are: A chronological summary listing work performed for the period; and summary reports for each major task undertaken in connection with the specific scope of this report. Presented in chronological order for the referenced time period. Manually-assembled table summaries are included for: Labor and exposures by department; and labor and exposures by major activity.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

31

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor building decontamination. Summary status report. Volume 2  

SciTech Connect (OSTI)

This document summarizes information relating to decontamination of the Three Mile Island Unit 2 (TMI-2) reactor building. The report covers activities for the period of June 1, 1979 through March 29, 1985. The data collected from activity reports, reactor containment entry records, and other sources were entered into a computerized data system which permits extraction/manipulation of specific information which can be used in planning for recovery from an accident similar to that experienced at TMI-2 on March 28, 1979. This report contains summaries of man-hours, manpower, and radiation exposures incurred during decontamination of the reactor building. Support activities conducted outside of radiation areas are excluded from the scope of this report. Computerized reports included in this document are: a chronological summary listing work performed relating to reactor building decontamination for the period specified; and summary reports for each major task during the period. Each task summary is listed in chronological order for zone entry and subtotaled for the number of personnel entries, exposures, and man-hours. Manually-assembled table summaries are included for: labor and exposures by department and labor and exposures by major activity.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

32

MHK Projects/Point Menoir Project | Open Energy Information  

Open Energy Info (EERE)

Menoir Project Menoir Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.6436,"lon":-91.3029,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

33

MHK Projects/Point Pleasant Project | Open Energy Information  

Open Energy Info (EERE)

Pleasant Project Pleasant Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2571,"lon":-91.1172,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

34

CenterPoint Energy Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead CenterPoint Energy Country United States Headquarters Location Houston, Texas Recovery Act Funding $200,000,000.00 Total Project Value $639,187,435.00 Coverage Area Coverage Map: CenterPoint Energy Smart Grid Project Coordinates 29.7632836°, -95.3632715° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

35

Hot Springs Point Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Hot Springs Point Geothermal Project Hot Springs Point Geothermal Project Project Location Information Coordinates 39.493055555556°, -117.06666666667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.493055555556,"lon":-117.06666666667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

36

"1. Nine Mile Point","Gas","Entergy Louisiana Inc",1756 "2. Willow Glen","Gas","Entergy Gulf States Louisiana LLC",1752  

U.S. Energy Information Administration (EIA) Indexed Site

Louisiana" Louisiana" "1. Nine Mile Point","Gas","Entergy Louisiana Inc",1756 "2. Willow Glen","Gas","Entergy Gulf States Louisiana LLC",1752 "3. Big Cajun 2","Coal","Louisiana Generating LLC",1743 "4. Brame Energy Center","Coal","Cleco Power LLC",1423 "5. R S Nelson","Coal","Entergy Gulf States Louisiana LLC",1366 "6. Little Gypsy","Gas","Entergy Louisiana Inc",1170 "7. Waterford 3","Nuclear","Entergy Louisiana Inc",1168 "8. Acadia Energy Center","Gas","Acadia Power Partners",1063 "9. River Bend","Nuclear","Entergy Gulf States Louisiana LLC",974

37

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Appendices Appendices DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 SITING AND WETLAND 404(b)1 ALTERNATIVES ANALYSIS BP CHERRY POINT COGENERATION PROJECT [REVISED] Prepared for: BP West Coast Products, LLC Submitted by: Golder Associates Inc. March 2003 013-1421.541 March 2003 i 013-1421.541 TABLE OF CONTENTS Page No. 1. INTRODUCTION 1 2. PURPOSE AND NEED 5 3. ALTERNATIVES 6 3.1 No Action Alternative 6 3.1.1 Self-Reliance 6 3.1.2 Efficiency 6 3.1.3 Reliability 6 3.1.4 Other Impacts of the No Action Alternative 7 3.2 Project Site Location Alternative Selection Process 7 3.2.1 Sufficient Acreage Available

38

Miles Hand Grenade  

DOE Patents [OSTI]

A simulated grenade for MILES-type simulations generates a unique RF signal and a unique audio signal. A detector utilizes the time between receipt of the RF signal and the slower-traveling audio signal to determine the distance between the detector and the simulated grenade.

Harrington, John J. (Albuquerque, NM); Buttz, James H. (Albuquerque, NM); Maish, Alex B. (Corrales, NM); Page, Ray R. (Albuquerque, NM); Metcalf, Herbert E. (Albuquerque, NM)

2005-11-15T23:59:59.000Z

39

MHK Projects/Orient Point Tidal | Open Energy Information  

Open Energy Info (EERE)

Orient Point Tidal Orient Point Tidal < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0748,"lon":-72.9461,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

40

MHK Projects/Amity Point | Open Energy Information  

Open Energy Info (EERE)

Amity Point Amity Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-27.3978,"lon":153.437,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

MHK Projects/South Myette Point | Open Energy Information  

Open Energy Info (EERE)

Myette Point Myette Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.8902,"lon":-91.4391,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

42

MHK Projects/Breeze Point | Open Energy Information  

Open Energy Info (EERE)

Breeze Point Breeze Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.1029,"lon":-91.6161,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

43

MHK Projects/Cypress Point | Open Energy Information  

Open Energy Info (EERE)

Point Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.8714,"lon":-91.8051,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

44

MHK Projects/Palmetto Point | Open Energy Information  

Open Energy Info (EERE)

Palmetto Point Palmetto Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.1614,"lon":-91.6013,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

45

MHK Projects/Myette Point | Open Energy Information  

Open Energy Info (EERE)

Myette Point Myette Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9431,"lon":-91.4668,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

46

MHK Projects/Barfield Point | Open Energy Information  

Open Energy Info (EERE)

Barfield Point Barfield Point < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.8362,"lon":-89.7181,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

47

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor coolant system and systems decontamination. Summary status report. Volume 1  

SciTech Connect (OSTI)

This document summarizes information relating to the decontamination and restoration of the Three Mile Island Unit 2 reactor coolant system and other plant systems. Data have been collected from activity reports, reactor containment entry records, and other sources and entered in a computerized data system which permits extraction/manipulation of specific data which can be used in planning for recovery from a loss of coolant event similar to that experienced by the Three Mile Island Unit 2 on March 28, 1979. This report contains a summary of radiation exposures, manpower, and time spent in radiation areas during the referenced period. Support activities conducted outside of radiation areas are not included. Computer reports included are: A chronological listing of all activities related to decomtamination and restoration of the reactor coolant system and other plant systems for the period of April 5, 1979, through December 19, 1984; a summary of labor and exposures by department for the same time period; and summary reports for each major task undertaken in connection with this specific work scope during the referenced time period.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

48

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2. Radioactive waste and laundry shipments. Volume 9. Summary status report  

SciTech Connect (OSTI)

This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 to May 5, 1985. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

Doerge, D. H.; Miller, R. L.; Scotti, K. S.

1986-05-01T23:59:59.000Z

49

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

50

miles-99.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Vertical Velocity Statistics as Derived from 94-GHz Vertical Velocity Statistics as Derived from 94-GHz Radar Measurements N. L. Miles, D. M. Babb, and J. Verlinde The Pennsylvania State University University Park, Pennsylvania Introduction Profiles of millimeter-wavelength radar Doppler spectra contain information about both the mean vertical velocities and cloud microphysics. In order to obtain this information, it is necessary to remove the effects of turbulence. Stratocumulus clouds often contain various species of ice and liquid, including graupel, crystals, columns, plates, liquid droplets, and drizzle drops. Most of the previous work to remotely determine microphysics of stratus clouds has largely ignored the presence of drizzle and ice, restricting applicability to only liquid clouds with no drizzle, a relatively rare event. Since mixed phase

51

Microsoft Word - Seven Mile CX.doc  

Broader source: Energy.gov (indexed) [DOE]

October 7, 2010 October 7, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum - Seven Mile Project Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Seven Mile Project Budget Information: Work Order 00211600 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.11 "Installation of fencing... that will not adversely affect wildlife of surface water flow." B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." B4.11 "Construction or electric power substations (including switching stations and support facilities) with power delivery at 230-kV or below, or modification (other than voltage increases) of existing

52

Microsoft PowerPoint - International Projects1.pptm.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

International Program International Program Modeling Activities Boris Faybishenko Lawrence Berkeley National Laboratory Berkeley, CA DOE-EM Project Managers- Kurt Gerdes and Skip Chamberlain Performance Assessment Community of Practice Technical Exchange April 13-14, 2010, Richland, WA Outline * Review of projects formerly supported by DOE-EM * Potential International Projects and Analogue Case Studies for ASCEM - Chernobyl Cooling Pond, Ukraine - Nonclassical transport modeling-project with the Nuclear Safety Institute of RAS, Russia - Uranium Mine and Mills Tailing's Covers * Central Asia--Kazakhstan, Tajikistan, Kyrgyzstan, and Uzbekistan - Cementitious Materials for Long-Term Storage and Disposal * Conclusions and Recommendations Overall Objectives of DOE-EM International Program Modeling Activities

53

EA-1942: Cove Point Liquefaction Project, Lusby, MD | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Cove Point Liquefaction Project, Lusby, MD 2: Cove Point Liquefaction Project, Lusby, MD EA-1942: Cove Point Liquefaction Project, Lusby, MD SUMMARY The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EA, to analyze the potential environmental impacts of a proposal to add natural gas liquefaction and exportation capabilities to an existing Cove Point LNG Terminal located on the Chesapeake Bay in Lusby, Maryland. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 28, 2012 EA-1942: Notice of Intent to Prepare an Environmental Assessment Cove Point Liquefaction Project, Lusby, MD September 24, 2012 EA-1942: Notice of Intent of to Prepare an Environmental Assessment Cove Point Liquefaction Project, Lusby, MD

54

EIS-0349: Cherry Point Co-generation Project  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to support BP West Coast Products, LLC proposal to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery.

55

DOE/EA-1584: Final Environmental Assessment for Sand Point Wind Installation Project, Sand Point, Alaska (September 2009)  

Broader source: Energy.gov (indexed) [DOE]

Sand Point Wind Installation Project Sand Point, Alaska DOE/EA -1584 U.S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401-3305 September 2009 TABLE OF CONTENTS Page 1.0 INTRODUCTION .............................................................................................................. 1 1.1 NATIONAL ENVIRONMENTAL POLICY ACT AND RELATED PROCEDURES....................................................................................................... 1 1.2 BACKGROUND .................................................................................................... 1 1.3 PURPOSE AND NEED.......................................................................................... 2 1.4 PUBLIC SCOPING AND CONSULTATION.......................................................

56

Microsoft PowerPoint - Project X Discussion_SDH.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne-Fermilab Collaboration on Argonne-Fermilab Collaboration on Project X (Accelerator) Steve Holmes projectx.fnal.gov Argonne-Fermilab Collaboration Meeting November 27, 2007 Page 2 ANL-FNAL Meeting, 11-27-07 - S. Holmes Outline * Project X Program - Steve H. - What is Project X? - November 12-13 Workshop - Areas of collaboration - Modes of collaboration * High Intensity Neutrino Source (HINS) Program - Giorgio A. - Goals of the program - Areas of collaboration - Relationship to Project X Page 3 ANL-FNAL Meeting, 11-27-07 - S. Holmes What is Project X? ILC-style 8 GeV H - linac: 9mA x 1 msec x 5 Hz 8 GeV slow/fast spill 200 kW 2.25E14 protons/1.4 sec Stripping Foil Recycler 3 linac pulse/fill Main Injector 1.4 sec cycle 120 GeV fast extraction 2.3 MW 1.7E14 protons/1.4 sec Single turn transfer @ 8 GeV NOνA initially,

57

The geometry of eight points in projective space: representation theory, Lie theory and dualities  

Science Journals Connector (OSTI)

......this map Sec(M8) N8 lifts to Sec(M8) N8, and...Suppose we are given a point of Sec(M8) on a line...projective coordinates of the point indexed by the entry in...2 and n = 4, and the four points in P1 have coordinates......

Benjamin Howard; John Millson; Andrew Snowden; Ravi Vakil

2012-12-01T23:59:59.000Z

58

Microsoft PowerPoint - Surash.AcquisitionProjectMgmt.042909  

Broader source: Energy.gov (indexed) [DOE]

Management Advisory Board J. E. Surash, P. E. Deputy Assistant Secretary Acquisition and Project Management April 29, 2009 2 Agenda Update on FY09 Plan for Acquisition & Contracting Small Business Activities Project Management Areas of Focus 3 Process Contact Handled Transuranic Debris and Soils Waste Process Remote Handled Transuranic Debris and Soils Waste Process Remote Handled Transuranic Sludge Waste Ship Transuranic Waste to Waste Isolation Pilot Plant Transuranic Waste Processing Center Oak Ridge, Tennessee Apr-May-Jun 2009 Jun 16, 2008 Apr 2, 2008 Award Industry Proposal Due Request for Proposals Estimated Value 3-year base, 2-year option: $150M-$200M (Small Business Set- Aside) Scope of Work 4 Waste Processing of Transuranic And Special Requirements Wastes

59

Miles Electric Vehicles | Open Energy Information  

Open Energy Info (EERE)

Miles Electric Vehicles Jump to: navigation, search Name: Miles Electric Vehicles Place: Santa Monica, California Zip: 90405 Sector: Vehicles Product: California-based developer of...

60

MHK Projects/Pointe du Bois | Open Energy Information  

Open Energy Info (EERE)

du Bois du Bois < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.2969,"lon":-95.5485,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

62

Baseline and Projected Future Carbon Storage and Greenhouse-Gas Fluxes in Ecosystems of the  

E-Print Network [OSTI]

- covered foothills in the background. (Photograph by Benjamin M. Sleeter.) #12;Baseline and Projected LaPoint, Patrick Miles, Ronald Piva, Jeffery Turner, and Brad Smith of the USDA Forest Service

Fleskes, Joe

63

MHK Projects/Pointe a la Hache Project | Open Energy Information  

Open Energy Info (EERE)

a la Hache Project a la Hache Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.5763,"lon":-89.7917,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

64

NAME: Sears Point Tidal Restoration Project LOCATION: Near Petaluma, CA, in the San Pablo Bay and Tolay Creek Watersheds  

E-Print Network [OSTI]

of estuarine habitat comprised of deep and shallow water habitat, mudflats, salt marsh, and wetlandNAME: Sears Point Tidal Restoration Project LOCATION: Near Petaluma, CA, in the San Pablo Bay PROJECT DESCRIPTION: Sears Point, the proposed project site, consists of approximately 960 acres of diked

US Army Corps of Engineers

65

Points  

Broader source: Energy.gov (indexed) [DOE]

Project Selections Project Selections Announced October 26, 2009 Lead Research Organization (Partner Organizations) DOE Grant Amount Lead Organization Location Project Description 1366 Technologies Inc. (Massachusetts Institute of Technology - Lab for PV Research) $4,000,000 Lexington, MA Renewable Power (solar) "Direct Wafer" technology to form high efficiency "monocrystalline- equivalent" silicon wafers directly from molten silicon, with potential to halve the installed cost of solar photovoltaics. Agrivida, Inc. $4,565,800 Medford, MA Biomass Energy Cell wall-degrading enzymes grown within the plant itself that are activated after harvest, dramatically reducing the cost of cellulosic biofuels and chemicals Arizona State University (Fluidic Energy,

66

The project RTPPP (Development of a realtime PPP processing facility) is planned to be a followup project of RAPPP (Innovative Algorithms for Rapid Precise Point Positioning),  

E-Print Network [OSTI]

RTPPP The project RTPPP (Development of a realtime PPP processing facility) is planned to be a followup project of RAPPP (Innovative Algorithms for Rapid Precise Point Positioning), which has RAPPP, the proposed project RTPPP concentrates on the possibilities of the PPP technique within a real

Schuh, Harald

67

Three Mile Island: then and now  

SciTech Connect (OSTI)

A review of the Three Mile Island Unit 2 accident is presented. Current activities to clean up the reactor are described.

Trauger, D.B.

1980-01-01T23:59:59.000Z

68

Microsoft PowerPoint - CF-LM M2W Project Updates_final [Compatibility...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Upgrade Project (M2W Project) Project description: * Upgrade existing BPA Transmission system West of Garrison substation. Project includes upgrades at five...

69

Chapter 3. Vehicle-Miles Traveled  

U.S. Energy Information Administration (EIA) Indexed Site

3. Vehicle-Miles Traveled 3. Vehicle-Miles Traveled Chapter 3. Vehicle-Miles Traveled Vehicle-miles traveled--the number of miles that residential vehicles are driven--is probably the most important information collected by the Residential Transportation Energy Consumption Survey. Using the data on vehicle-miles traveled allows analysts to answer such questions as: "Are minivans driven more than passenger cars?" "Do people in the West drive more than people elsewhere?" "Do people conserve their new cars by driving them less?" "Who drives more--people in households with children, or other people?" "At what ages do people drive the most?" "How does growing income affect the amount of driving?" In addition to answering those kinds of questions, analysts also use the number of vehicle-miles traveled to compute estimated, on-road vehicle fuel consumption, economy, and expenditures, all of which have important implications for U.S. energy policy and national security (see Chapter 4).

70

The train problem assumes a circular track 101 miles in circumference. The track is labeled clockwise in miles starting at due north. ie. 0 through 100. Mile 101 would be at the same spot as mile 0.  

E-Print Network [OSTI]

A3: trains The train problem assumes a circular track 101 miles in circumference. The track as mile 0. Train1 starts at mile 0 going clockwise. Train2 starts at mile 50 also going clockwise. The program prompts for speeds of each train in mph. The output is the mile (or fraction) at which one train

Huth, Michael

71

Three Mile Canyon | Open Energy Information  

Open Energy Info (EERE)

Mile Canyon Mile Canyon Jump to: navigation, search Name Three Mile Canyon Facility Three Mile Canyon Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner John Deere Wind Developer Momentum RE Energy Purchaser PacifiCorp Location Morrow County OR Coordinates 45.717419°, -119.502258° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.717419,"lon":-119.502258,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

72

Wireless Technology Leaps the Last Mile  

Science Journals Connector (OSTI)

Topics include "Wireless Technology Leaps the Last Mile," "Researcher Turns Computers into Better Listeners," and "IBM Puts Encryption in a Processor. Keywords: wireless technology, speech recognition technology, encryption, digital-content protection

Linda Dailey Paulson

2006-06-01T23:59:59.000Z

73

Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

74

1st Mile | Open Energy Information  

Open Energy Info (EERE)

Mile Mile Jump to: navigation, search Name 1st Mile Place Lyngby, Denmark Zip 2800 Product Denmark-based company that provides research and screening for venture capitalists. Website http://www.1stmile.dk/ Coordinates 56.866669°, 8.31667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.866669,"lon":8.31667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

75

Miles Below the Earth: The Next-Generation of Geothermal Energy |  

Broader source: Energy.gov (indexed) [DOE]

Miles Below the Earth: The Next-Generation of Geothermal Energy Miles Below the Earth: The Next-Generation of Geothermal Energy Miles Below the Earth: The Next-Generation of Geothermal Energy February 7, 2011 - 12:34pm Addthis John Schueler John Schueler Former New Media Specialist, Office of Public Affairs What will the project do? Enhanced geothermal systems (EGS) essentially create man-made reservoirs that mimic naturally occurring pockets of steam- with the potential for use as a reliable, 24/7 source of renewable energy. For more than a century, traditional geothermal power plants have been generating electricity by extracting pockets of steam found miles below the Earth's surface. Until recently though, those plants could only be constructed in locations where pockets of steam had formed naturally. Enhanced geothermal systems (EGS) have been crafted to solve that problem

76

Debate over waste imperils 3-mile cleanup  

Science Journals Connector (OSTI)

...solidification ofthe 560,000 gallons of high level waste left from the commercial fuel reprocessing plant that operated at West Valley, New York, from 1966 to 1972. But any suggestion that the new solidification facility also be used for Three Mile...

LJ Carter

1980-10-10T23:59:59.000Z

77

Microsoft PowerPoint - HVBPL Project Summary_Renz_APPROVED_2009...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Electricity Delivery and Energy Reliability MODERN GRID S T R A T E G Y 3 82609 HV BPL Demonstration Project Background One of DOE's funded demonstration projects of...

78

Points, lines and diamonds: a two-sorted modal logic for projective planes  

Science Journals Connector (OSTI)

......P1) each pair of distinct points is connected by exactly one...lines intersects in exactly one point, (P3) there are at least four points such that no three of them are...obviously, here one could lift the restriction that and ' be......

Y Venema

1999-10-01T23:59:59.000Z

79

1982 worldwide pipeline construction will top 21,900 miles, $9. 5 billion  

SciTech Connect (OSTI)

Reports that pipeline construction slowed slightly in 1982 because of lowered economic activity worldwide, with an upturn forecast for 1983. Explains that need for new pipelines to transport increasing amounts of oil and gas energy now being discovered, plus use of pipelines to transport other commodities in increasing amounts, has created a backlog of demand for facilities. Indicates that commodities suited for pipeline transport and getting consideration include crude oil; refined products; natural gas liquids; LPG; coal slurries; carbon dioxide (used for enhanced oil recovery); chemicals such as ammonia, ethane, ethylene, and similar petrochemical feedstocks; industrial gases such as oxygen, nitrogen; and solids slurries such as ores, wood chips, and other non-soluble minerals, even items such as wood chips and wood pulp for paper-making. Reveals that there are 10,396 miles of coal slurry pipeline planned for the US and 500 miles in Canada. Major US projects underway in the gas pipeline field include the 797-mile, 36-in. Trailblazer system in Nebraska, Wyoming, Colorado, and Utah. Products/ LPG/NGL pipelines underway include 105 miles of dual 4 and 6-in. line in Kansas. Crude pipeline activity includes 100 miles of 12-in. in California and 80 miles of 4 thru 40-in. in Alaska on the North Slope. Updates plans in Canada, Scotland, Denmark, Ireland, France, the Middle East, Australia, Southeast Asia, Mexico, South America and the USSR.

Hall, D.

1982-07-01T23:59:59.000Z

80

square miles | OpenEI Community  

Open Energy Info (EERE)

0 0 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235190 Varnish cache server square miles Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land use solar land use square miles I'm happy to announce that a new report on Solar+Land+Use was just released by the National+Renewable+Energy+Laboratory. You can find a brief summary of the results at the Solar+Land+Use page on OpenEI.

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network [OSTI]

occurred during the nuclear accident, and probably noHEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT MILE ISLAND JacobENG-48 HEALTH EFFECTS OF THE NUCLEAR ACCIDENT A T THREE MILE

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

82

Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Miles Traveled Vehicle Miles Traveled Tax Feasibility Evaluation to someone by E-mail Share Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Facebook Tweet about Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Twitter Bookmark Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Google Bookmark Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Delicious Rank Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Digg Find More places to share Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

83

Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Oregon Celebrates 200 Oregon Celebrates 200 Miles of Electric Highways to someone by E-mail Share Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Facebook Tweet about Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Twitter Bookmark Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Google Bookmark Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Delicious Rank Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Digg Find More places to share Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on AddThis.com... April 18, 2012 Oregon Celebrates 200 Miles of Electric Highways " These [electric charging] stations will help create a corridor that, by the

84

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Broader source: Energy.gov (indexed) [DOE]

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

85

Sustainability at the project level : the case of Willets Point, Queens  

E-Print Network [OSTI]

Citywide sustainability planning creates a vision of how environmental concerns will shape urban development, but the way these plans are incorporated into individual development projects plays a large role in determining ...

Watson, Siobhan (Siobhan Therese)

2008-01-01T23:59:59.000Z

86

Focus Series: Denver Energy Advisor Program Helps Homeowners Go the Extra Mile in Mile-High City  

Broader source: Energy.gov [DOE]

Focus Series: Denver Energy Advisor Program Helps Homeowners Go the Extra Mile in Mile-High City, a publication of the U.S. Department of Energy's Better Buildings Program.

87

Microsoft PowerPoint - Project DE_FE0000032 Student Modules.pptx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and and Research and Research 2011 Yearly Review Meeting P j t DE FE0002111 Project DE-FE0002111 Title: A Modular Curriculum for Training University Students in Industry Standard CO2 Sequestration and Enhanced Oil Recovery q y Methodologies University of Texas of the Permian Basin y Presenter: Dr. Robert Trentham, Director Center for Energy and Economic Diversification February 23, 2011 Project Participants Project Participants * Dr Robert C. Trentham, Co-PI (Geology, CO2) , ( gy, ) * Dr Emily Stoudt, Co-PI (Geology) * Mr Robert Kiker (Production Engineering, Plant ) Visits) * Mr Steve Melzer (Reservoir Engineering, CO2) M T i M G i (L d M t) * Ms Teri McGuigan (Land Management) * Mr EMr. Emmanuel Ede, student * Ms Ibukun Bode (IBK)

88

AVTA: ChargePoint America Recovery Act project map of charging units  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports describe results of data collected through the Chargepoint America project, which deployed 4,600 public and home charging stations throughout the U.S.

89

Experimental Wave Tank Test for Reference Model 3 Floating-Point Absorber Wave Energy Converter Project  

SciTech Connect (OSTI)

The U.S. Department of Energy established a reference model project to benchmark a set of marine and hydrokinetic technologies including current (tidal, open-ocean, and river) turbines and wave energy converters. The objectives of the project were to first evaluate the status of these technologies and their readiness for commercial applications. Second, to evaluate the potential cost of energy and identify cost-reduction pathways and areas where additional research could be best applied to accelerate technology development to market readiness.

Yu, Y. H.; Lawson, M.; Li, Y.; Previsic, M.; Epler, J.; Lou, J.

2015-01-01T23:59:59.000Z

90

Microsoft PowerPoint - Vicksburg District Federal Power Projects Branson Conf. 6-2-10 .pptx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Vicksburg Vicksburg District Federal Power Projects Vicksburg District Federal Power Projects Blakely Mountain Hydro DeGray Hydro DeGray Hydro Narrows Hydro Blakely Mountain Rewind Unit #1 ll Rotor Installation Blakely Mountain Rewind Unit #2 l l Coil Removal Blakely Mountain Rewind Unit #2 l Pole Key Design Blakely Mountain Rewind Unit #2 i l i h l d Removing Pole Key With Sledge Hammer Blakely Rewind Unit #2 Bigger Hammer & Operator Blakely Mountain Rewind Unit #2 l h Removing Rotor Poles With A Saw Blakely Mountain Surge Tank f b h Refurbishment Blakely Mountain Surge Tank f b h Refurbishment Blakely Mountain Switchyard d Disconnect Upgrades Blakely Mountain Switchyard l Oil Containment DeGray Rewind Unit # 2 bl Disassembly DeGray Rewind Unit #2 l l First Coil Samples

91

A GEM Award (Going the Extra Mile)  

Broader source: Energy.gov (indexed) [DOE]

GEM Award GEM Award Going the Extra Mile A Gift Card Recognition Program Who may receive? All Headquarters Department of Energy Employees except Political Appointees (including Schedule C and non-career members of the SES). Any Employee may nominate. What is it? $25 or $50 Gift Cards from 100s Department Stores, Book Stores, Hotels and more. of nationally well known Movie Tickets, Restaurants, How do I do it? * Nominator fills out form. * Routes form through their organizational protocols. * Faxes or scans/emails to HQ Gift Card. * HQ Gift Card receives form, places order * Gift Certificate is sent to Recipient's Supervisor * Supervisor presents certificate to employee * Employee can redeem On-line or by phone for card their choice of When can I do this? HQ Gift Card is open for business now

92

square-mile Black Warrior Basin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

will inject CO will inject CO 2 into a coalbed methane (CBM) well in Tuscaloosa County, Alabama, to assess the capability of mature CBM reservoirs to receive and adsorb large volumes of CO 2 . Injection began at the test site on June 15; the site was selected because it is representative of the 23,000- square-mile Black Warrior Basin located in northwestern Alabama and northeastern Mississippi. It is estimated that this area has the potential to store in the range of 1.1 to 2.3 Gigatons of CO 2 , which is approximately the amount that Alabama's coal-fired power plants emit in two decades. The targeted coal seams range from 940 to 1,800 feet deep and are one to six feet thick. Approximately 240 tons of CO 2 will be injected over a 45- to 60-day period. More information

93

Three Mile Island: the financial fallout  

SciTech Connect (OSTI)

The nuclear accident at Three Mile Island raised serious questions about the financial ability of the electric utility company owners to clean up and repair the damaged reactor facilities while continuing to provide reliable electric service to customers. Financial insolvency of the companies is not imminent and power supplies are assured for the immediate future. However, the loss of earnings capability by the Metropolitan Edison Company makes it questionable whether it can fund its share of the clean-up costs and maintain system reliability without large rate increases or some external financial assistance. The accident has shown that the utilities and Federal and State regulatory agencies were not prepared to deal with recovery from such a large financial loss. The Department of Energy should move swiftly to assess the financial needs of the affected utilities and develop plans for meeting them.

Not Available

1980-07-07T23:59:59.000Z

94

Three Mile Island: meltdown of democracy  

SciTech Connect (OSTI)

Strong local opposition to a start-up of Unit 1 at Three Mile Island continues because citizen distrust of General Public Utilities was found in post-accident studies to have been justified. Several citizen groups have monitored the Unit 2 clean-up activities and have not been reassured by either the President's Commission or the Nuclear Regulatory Commission. Efforts to improve public relations by distributing radiation kits or other strategies have been outweighed by evidence of government manipulation of early bomb test data and poor industry planning. Arguments over who is responsible for the accident and who is liable for the cost have further undermined credibility. Area residents have received three recent legal signals that their position may prevail. (DCK)

Walsh, E.J.

1983-03-01T23:59:59.000Z

95

Atmospheric Radiation Measurement (ARM) Data from Point Reyes, California for the Marine Stratus, Radiation, Aerosol, and Drizzle (MASRAD) Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Point Reyes National Seashore, on the California coast north of San Francisco, was the location of the first deployment of the DOE's Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF). The ARM Program collaborated with the U.S. Office of Naval Research and DOE's Aerosol Science Program in the Marine Stratus, Radiation, Aerosol, and Drizzle (MASRAD) project. Their objectives were to collect data from cloud/aerosol interactions and to improve understanding of cloud organization that is often associated with patches of drizzle. Between March and September 2005, the AMF and at least two research aircraft were used to collect data.

96

Microsoft PowerPoint - 04CifernoStanford - Capture Project Summary.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Program US Perspective on CO 2 Capture and Separation Jared P. Ciferno - National Energy Technology Laboratory Global Climate and Energy Project April 27, 2004 Stanford University GCEP - JPC - 4/27/04 Presentation Outline * Carbon Sequestration Program * Pre-Combustion CO 2 Technologies * Post-Combustion CO 2 Technologies * Oxy-Fuel Technologies * Modeling and Assessment Tools * On-Site NETL R & D GCEP - JPC - 4/27/04 * One of DOE's 17 national labs * Government owned/operated * Sites in Pennsylvania, West Virginia, Oklahoma, Alaska * More than 1,100 federal and support contractor employees * FY 03 budget of $750 million National Energy Technology Laboratory GCEP - JPC - 4/27/04 Carbon Sequestration Program Structure Infrastructure 7 Regional Partnerships * Engage regional, state, local

97

Salt Wells, Eight Mile Flat | Open Energy Information  

Open Energy Info (EERE)

Salt Wells, Eight Mile Flat Salt Wells, Eight Mile Flat Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells, Eight Mile Flat Abstract Abstract unavailable. Author Nevada Bureau of Mines and Geology Published Online Nevada Encyclopedia, 2009 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Salt Wells, Eight Mile Flat Citation Nevada Bureau of Mines and Geology. Salt Wells, Eight Mile Flat [Internet]. 2009. Online Nevada Encyclopedia. [updated 2009/03/24;cited 2013/08/07]. Available from: http://www.onlinenevada.org/articles/salt-wells-eight-mile-flat Related Geothermal Exploration Activities Activities (1) Areas (1) Regions (0) Development Wells At Salt Wells Area (Nevada Bureau of Mines and Geology, 2009) Salt Wells Geothermal Area

98

Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled  

Broader source: Energy.gov [DOE]

For reducing greenhouse gas emissions, the table below describes petroleum reduction strategies to reduce vehicle miles traveled, as well as guidance and best practices for each strategy.

99

Record of Decision for the Electrical Interconnection of the BP Cherry Point Cogeneration Project (DOE/EIS-0349) (11/10/04)  

Broader source: Energy.gov (indexed) [DOE]

BP Cherry Poi BP Cherry Poi nt Cogeneration Project DECISION The Bonneville Power Administration (Bonneville) has decided to implement the proposed action identified in the BP Cherry Point Cogeneration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0349, August 2004). Under the proposed action, Bonneville will offer contract terms for interconnection of the BP Cherry Point Cogeneration Project (Project) with the Federal Columbia River Transmission System (FCRTS), as requested by BP West Coast Products, LLC (BP) and proposed in the FEIS. The proposed Project involves constructing and operating a new 720-megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 265-acre site adjacent to BP's existing Cherry Point Refinery between Ferndale and

100

Digital Book Showcases Washington Wind Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Digital Book Showcases Washington Wind Project Digital Book Showcases Washington Wind Project Digital Book Showcases Washington Wind Project June 24, 2010 - 12:09pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE In what looks and feels more like an e-book on the iPad than a website, a new digital book by Cannon Power Group, a San Diego-based developer of utility-scale wind, tells the story of the construction of a 400 MW wind farm along a 26-mile stretch in Goldendale, Washington, located on a ridgeline plateau about 125 miles east of Portland, Oregon. "The New American Farm" chronicles the stages of the Windy Flats/Windy Point project in seven interactive chapters: from "Prospecting" (finding the right site) to "Planting" (installing 175, 300-foot turbines) to

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

102

Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled |  

Broader source: Energy.gov (indexed) [DOE]

Reduce Vehicle Miles Traveled Reduce Vehicle Miles Traveled Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled October 7, 2013 - 11:52am Addthis YOU ARE HERE: Step 3 For reducing greenhouse gas emissions, the table below describes petroleum reduction strategies to reduce vehicle miles traveled, as well as guidance and best practices for each strategy. Table 1. Determining When and How to Promote the Use of Strategies to Reduce Vehicle Miles Traveled Strategy When Applicable Best Practices Consolidate trips Applicable to all vehicles, regardless of ownership or vehicle and fuel type Target vehicle operators who take longer trips Seek vehicle operator input and collaboration to identify regular or occasional trips that involve similar routes. Determine whether trips on multiple days or times can be consolidated into a single trip.

103

Debate over waste imperils 3-Mile cleanup  

SciTech Connect (OSTI)

The cleanup is a task of extraordinary proportions. Every step in the cleanup must be taken in a highly sensitive political and regulatory environment. A demineralizer or ion exchange filtration unit was installed in order that the fission products could be removed from the water spilled in the auxiliary and fuel handling buildings. GPU later vented krypton gas. Twice now engineers have made cautions entries into the containment building as part of the effort to size up the job. Cleanup will be costly, requiring many workers. Some wastes will require special packaging in hundreds of containers with shielded overpacks, plus bulky items of hardware and equipment that cannot be easily packaged. There will be the damaged fuel assemblies from the reactor core. Removing the fuel from the reactor may be difficult. A troublesome waste disposal question has to do with the material to be generated in cleaning up the containment building's sump water. GPU's man in charge of clean-up strategy is to collect the wastes in a form that permits maximum flexibility with respect to their stage, packaging, transport, and ultimate disposal. If plans for disposal of all the wastes from the cleanup are to be completed, an early commitment by Pennsylvania and other northeastern states to establish a burial ground for low level waste generated within the region is needed. Also a speedy commitment by NRC, DOE, and Congress to a plan for disposal of the first-stage zeolites is needed. Should there be a failure to cope with the wastes that Three Mile Island cleanup generates, the whole nuclear enterprise may suffer.

Carter, L.J.

1980-10-10T23:59:59.000Z

104

Healthy Transportation Policy and Vehicle Miles  

E-Print Network [OSTI]

Food Environment Index (# of fast food and convenience stores divided by grocery stores and farmers markets) More info at www.publichealthadvocacy.org 2) Distance and safety of access to K-12 schools of procedures, methods and tools by which a policy, program or project may be judged for its potential health

Bertini, Robert L.

105

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. Additional information is available at the project...

106

Odometer Versus Self-Reported Estimates of Vehicle Miles Traveled  

Reports and Publications (EIA)

The findings described here compare odometer readings with self-reported estimates of Vehicle Miles Traveled (VMT) to investigate to what extent self-reported VMT is a reliable surrogate for odometer-based VMT.

2000-01-01T23:59:59.000Z

107

Full Useful Life (120,000 miles) Exhaust Emission Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Full Useful Life (120,000 miles) Exhaust Emission Performance of a NOx Adsorber and Diesel Particle Filter Equipped Passenger Car and Medium-Duty Engine in Conjunction with...

108

Innovative Cell Materials and Designs for 300 Mile Range EVs  

Broader source: Energy.gov (indexed) [DOE]

300 Mile Range EVs Yimin Zhu, PDPI Nanosys, Inc Palo Alto, California May 13 17, 2013 DOE Vehicle Technologies AMR 2013 ES130zhu2013p This presentation does not contain any...

109

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network [OSTI]

within 50 miles of the nuclear power plant was estimated tothe radiation from the nuclear power plant accident. From anand the Peach Bottom nuclear power plants, like the general

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

110

18 MILES NORTH OF PHlLADEl.PHlA HATBORO, PA. August  

Office of Legacy Management (LM)

8 MILES NORTH OF PHlLADEl.PHlA 8 MILES NORTH OF PHlLADEl.PHlA HATBORO, PA. August 27, 1948 ! ! Frank Giaccio' Commission / I This follows my letter of August ZOth, in which I promised to advise you of our thoughts concerning beryllium, after I had completed a series of con- tacts with both.Government and private,grou?s and had an opportunity to evaluate the possibilities of using our process from the point of view of industrial research. By this, I meanthe possibility of the research leading into substantial production of parts. I believe I mentioned some of the contacts to you when I was in your office, and that we still had more to make. It is my opinion now that as far as beryllium is concerned, I cannot visualize the possibility of large production runs of parts; because it is

111

Seven Mile Hole Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Seven Mile Hole Geothermal Area (Redirected from Seven Mile Hole Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Seven Mile Hole Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (4) 10 References Area Overview Geothermal Area Profile Location: Wyoming Exploration Region: Yellowstone Caldera Geothermal Region GEA Development Phase:

112

Seven Mile Hole Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Seven Mile Hole Geothermal Area Seven Mile Hole Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Seven Mile Hole Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (4) 10 References Area Overview Geothermal Area Profile Location: Wyoming Exploration Region: Yellowstone Caldera Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

113

Category Capstone Project Title Student Names Bioengineering & Medical Devices A Point-of-Care Platform for Neonatal Complete Blood Counts  

E-Print Network [OSTI]

Project Peter Florin, Byron Pakter, Eric Scott, Brian Mick Product Design Concussion Terminator : Football Helmet Design, Analysis, Economics Meyssane Alj Hakim, Bruce Lin, Michael Liou Product Design Alo

Sekhon, Jasjeet S.

114

Creating Efficiencies in Last Mile Delivery through Workforce  

E-Print Network [OSTI]

objectives · Extend the planning horizon to achieve more efficiency · Discuss general trends in workforceCreating Efficiencies in Last Mile Delivery through Workforce Management Maciek Nowak Associate workforce management and its advantages · Discuss new research looking to expand the customer service

Bustamante, Fabián E.

115

NASA maps volcano's 4000-mile-long SO2 cloud  

Science Journals Connector (OSTI)

NASA maps volcano's 4000-mile-long SO2 cloud ... The S02 was mapped on June 18 by the Total Ozone Mapping Spectrometer, an instrument aboard NASA's NIMBUS-7 satellite that has been measuring ozone levels and monitoring S02 since 1978. ...

1991-07-01T23:59:59.000Z

116

Equity Evaluation of Vehicle Miles Traveled Fees in Texas  

E-Print Network [OSTI]

to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

Larsen, Lisa Kay

2012-10-19T23:59:59.000Z

117

Microsoft PowerPoint - 16.1225_Terry Cooke-Davies - Project Complexity as of 16 Mar  

Broader source: Energy.gov (indexed) [DOE]

Complexity Complexity Dr Terry Cooke-Davies, Group Chairman Group Chairman, Human Systems International Talking about Complexity Talking about Complexity Causes of Complexity in Projects Projects Today's Talk Responses to Complexity y 2 Why do we do it, and what do we mean when we are Talking about Complexity? g p y 3 What is Complexity? * No generally agreed definition What is Complexity? No generally agreed definition - "If you don't know what will happen when you kick it, then it is complex." * Any definition risks being inadequate * Any definition risks being inadequate - "Complex" is different from "Complicated" - Complexity is both relative and absolute. What is Complexity p y 4 Why are we so interested in it? * Need for managers of more challenging projects F il f

118

EA-1985: Virginia Offshore Wind Technology Advancement Project...  

Broader source: Energy.gov (indexed) [DOE]

5: Virginia Offshore Wind Technology Advancement Project (VOWTAP), 24 nautical miles offshore of Virginia Beach, Virginia EA-1985: Virginia Offshore Wind Technology Advancement...

119

BPA, Transmission, I-5 Corridor Reinforcement Project, presentation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 17 Factors we consider Electrical needs for...

120

Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9: April 25, 9: April 25, 2005 Medium-Truck Miles by Age to someone by E-mail Share Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Facebook Tweet about Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Twitter Bookmark Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Google Bookmark Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Delicious Rank Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Digg Find More places to share Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on AddThis.com... Fact #369: April 25, 2005 Medium-Truck Miles by Age Medium trucks (class 3-6) were driven an average of 14,439 miles in 2002.

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Region Region (RMCCS) Dr. Vince Matthews - Colorado Geological Survey Wayne Rowe - Schlumberger Carbon Services Bill O'Dowd RMCCS * Project Overview - Regional Geology - Site Specific Characterization - Basin-wide Characterization * Well Construction RMCCS * Project Overview - Regional Geology - Site Specific Characterization - Basin-wide Characterization * Well Construction 4.8 miles North South Dakota Sandstone Chinle Entrada contact . Example of fracture behavior in steeply dipping Entrada sandstone Weber sandstone outcrop White Rim Sandstone The Plan - Year 1 Characterize the Structure Pick location for drill hole Build database Purchase seismic Process & interpret seismic Map surface structure Shoot additional seismic lines Permit well Dakota Structure Around Strat Test Well Locations of Reprocessed

122

one mile underground into a deep saline formation. The injection  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

mile underground into a deep saline formation. The injection, mile underground into a deep saline formation. The injection, which will occur over a three-year period and is slated to start in early 2010, will compress up to 1 million metric tonnes of CO 2 from the ADM ethanol facility into a liquid-like, dense phase. The targeted rock formation, the Mt. Simon Sandstone, is the thickest and most widespread saline reservoir in the Illinois Basin, with an estimated CO 2 storage capacity of 27 to 109 billion metric tonnes. A comprehensive monitoring program, which will be evaluated yearly, will be implemented after the injection to ensure the injected CO 2 is stored safely and permanently. The RCSP Program was launched by the Office of Fossil Energy (FE)

123

Seven Mile, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Mile, Ohio: Energy Resources Mile, Ohio: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.480056°, -84.5518916° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.480056,"lon":-84.5518916,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

124

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

125

Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3: June 11, 2007 3: June 11, 2007 Vehicle-Miles per Licensed Driver to someone by E-mail Share Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Facebook Tweet about Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Twitter Bookmark Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Google Bookmark Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Delicious Rank Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Digg Find More places to share Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on AddThis.com... Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver

126

Boise State University Automobile Use Mileage Log (Documentation for Business Miles)  

E-Print Network [OSTI]

Boise State University Automobile Use Mileage Log (Documentation for Business Miles) Rev. 03 University Automobile Use Mileage Log (Documentation for Business Miles) Rev. 03/10 PAGE ____ (IF YOU NEED

Barrash, Warren

127

NASA Green Flight Challenge: Conceptual Design Approaches and Technologies to Enable 200 Passenger Miles  

E-Print Network [OSTI]

-diesel, and other bio-fuel engines. The aircraft are using various technologies to improve aerodynamic, propulsionW = = = Jet Propellant Knots True Airspeed Kilo-Watt MPG = Miles Per Gallon MPGe MSL = = Miles Per Gallon

Waliser, Duane E.

128

Fact #729: May 28, 2012 Secondary Household Vehicles Travel Fewer Miles  

Broader source: Energy.gov [DOE]

When a household has more than one vehicle, the secondary vehicles travel fewer miles than the primary vehicle. In a two-vehicle household, the second vehicle travels less than half of the miles...

129

How to get to Queen Mary University of London (Mile End campus)  

E-Print Network [OSTI]

How to get to Queen Mary � University of London (Mile End campus) Please see the enclosed street all the mainline London railway stations. The Docklands Light Railway runs from Stratford to Tower campus. From Mile End station, turn left and cross Burdett Road and Mile End Road at the traffic lights

Wright, Francis

130

Vehicle engine use when no longer in transit; exceptions -Vehicle idling gets zero miles per gallon; unnecessary idling wastes fuel and pollutes.  

E-Print Network [OSTI]

gallon; unnecessary idling wastes fuel and pollutes. Running an engine at low speed (idling) also causes the point of view of both emissions and fuel consumption. Unless exempted in the following sectionVehicle engine use when no longer in transit; exceptions - Vehicle idling gets zero miles per

Powers, Robert

131

Three Mile Island waste management: a DOE Perspective  

SciTech Connect (OSTI)

The Department of Energy (DOE) is conducting waste management research and development activities which are applicable to the cleanup of the Three Mile Island-Unit 2 nuclear reactor. These activities have enabled DOE to provide timely assistance to General Public Utilities (GPU), the utility owner, the Nuclear Regulatory Commission (NRC), and the State of Pennsylvania in their efforts to quickly and safely clean up the damaged reactor. The DOE has been particularly active in evaluating proposed cleanup systems, providing information on waste characteristics, and advising GPU and NRC as to appropriate disposal methods for the waste generated during the cleanup. A description and discussion of some of these activities is presented.

D'Ambrosia, J.T.

1982-01-01T23:59:59.000Z

132

Integrated defueling system for Three Mile Island Unit 2  

SciTech Connect (OSTI)

The unique clean-up requirements of Three Mile Island Unit 2 have posed first-of-a-kind challenges for the equipment, tools, and operators involved in the defueling effort. Various equipment components and specialty remote tools were designed as an integrated defueling system to provide a means of safely working above the reactor and removing core debris. The basic defueling system consists of support equipment and specialty remote tools for specific operations. This paper describes the different equipment and tools, and explains the key interfaces and features of the integrated defueling system.

Brown, D.A.; Gallagher, R.E.; Rider, R.L.

1986-01-01T23:59:59.000Z

133

Analysis of Three Mile Island-Unit 2 accident  

SciTech Connect (OSTI)

The Nuclear Safety Analysis Center (NSAC) of the Electric Power Research Institute has analyzed the Three Mile Island-2 accident. Early results of this analysis were a brief narrative summary, issued in mid-May 1979 and an initial version of this report issued later in 1979 as noted in the Foreword. The present report is a revised version of the 1979 report, containing summaries, a highly detailed sequence of events, a comparison of that sequence of events with those from other sources, 25 appendices, references and a list of abbreviations and acronyms. A matrix of equipment and system actions is included as a folded insert.

Not Available

1980-03-01T23:59:59.000Z

134

Analysis of stream bed sediments of Four Mile Creek  

SciTech Connect (OSTI)

Until 1988, solutions containing nitric acid, odium hydroxide, low levels of radionuclides (mostly tritiated water) and some metals were discharged to unlined seepage basins at the F and H Areas of the Savannah River Site (SRS) as part of normal operations. The basins are now being closed according to the Resource Conservation and Recovery Act (RCA). As part of the closure, a Part B Post-Closure Care Permit is being prepared. The Part B permit requires information on contaminant concentrations in stream bed sediments in the adjacent Four Mile Creek, which are reported herein. 5 refs., 1 fig., 2 tabs.

Haselow, J.S.

1990-08-13T23:59:59.000Z

135

Microsoft PowerPoint - TranspTopics_Sullivan  

Broader source: Energy.gov (indexed) [DOE]

www.energy.govEM 2 * U.S. Department of Energy Project * 35 miles south of Buffalo, New York * New York State Energy Research and Development Authority (NYSERDA) holds title...

136

Microsoft PowerPoint - E1301037_B.pptx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Star Status and DOE Star of Excellence * Best safety record of any DOE D&D closure project * 136 of 220 square miles are field work complete * Washington Closure has nearly...

137

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

138

Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2: January 5, 2: January 5, 2009 Vehicle Miles of Travel by Region to someone by E-mail Share Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Facebook Tweet about Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Twitter Bookmark Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Google Bookmark Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Delicious Rank Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Digg Find More places to share Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on AddThis.com... Fact #552: January 5, 2009

139

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

project was authorized by the Flood Control Act approved 18 project was authorized by the Flood Control Act approved 18 August 1941 (Public No. 228, 77 th Congress, 1 st Session). Construction of the access road began in April 1946. Construction of Narrows Dam started in May 1947 and the structure was essentially completed by July 1950. Commercial operation began May 1950 on Units #1 and #2. Commercial operation began September 1969 on Unit #3. The Narrow Dam is located on the Little Missouri River, a tributary of the Ouachita River near Murfreesboro in Pike County, Arkansas. It is a multi-purpose project for flood and power generation. Maximum Pool 7,260 Acres Shoreline 134 Miles Type Concrete Gravity Crest Elevation 581 Feet,msl Spillway Type Concrete, Uncontrolled Spillway Crest Elevation 563 Feet,msl Number of Units

140

Methane Gas Utilization Project from Landfill at Ellery (NY)  

SciTech Connect (OSTI)

Landfill Gas to Electric Energy Generation and Transmission at Chautauqua County Landfill, Town of Ellery, New York. The goal of this project was to create a practical method with which the energy, of the landfill gas produced by the decomposing waste at the Chautauqua County Landfill, could be utilized. This goal was accomplished with the construction of a landfill gas to electric energy plant (originally 6.4MW and now 9.6MW) and the construction of an inter-connection power-line, from the power-plant to the nearest (5.5 miles) power-grid point.

Pantelis K. Panteli

2012-01-10T23:59:59.000Z

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Hidden costs of the accident at Three Mile Island  

SciTech Connect (OSTI)

It has been possible to identify a significant drop in the performance of Pressurised Water Reactors (PWRs) in the western world following the accident at Three Mile Island (TMI). Although there are indications that the magnitude of the load factor reduction was slightly larger in the U.S., there is nevertheless strong evidence to suggest that the response was felt in all countries with operating PWRs. The effect did not, however, extend to other reactor systems; even the generically similar Boiling Water Reactor (BWR) suffered no drop in output. It is estimated that the costs, worldwide, of this fall in performance are of the same order as the TMI clean-up operation.

Evans, N.

1982-09-01T23:59:59.000Z

142

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied...

143

Northern Wind Project Draft Environmental Assessment Roberts...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Power Administration (Western) Forman-Summit 115 kilovolt (kV) transmission line 7.4 miles north of the Summit Substation. The Project is a federal action under the...

144

Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7: July 29, 2002 7: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type to someone by E-mail Share Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Facebook Tweet about Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Twitter Bookmark Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Google Bookmark Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Delicious Rank Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Digg Find More places to share Vehicle Technologies Office: Fact #227:

145

Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5: September 8, 5: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 to someone by E-mail Share Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Facebook Tweet about Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Twitter Bookmark Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Google Bookmark Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Delicious Rank Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Digg Find More places to share Vehicle Technologies Office: Fact #535:

146

Light Water Reactor Sustainability Constellation Pilot Project FY13 Summary Report  

SciTech Connect (OSTI)

Summary report for Light Water Reactor Sustainability (LWRS) activities related to the R. E. Ginna and Nine Mile Point Unit 1 for FY13.

R. Johansen

2013-09-01T23:59:59.000Z

147

Light Water Reactor Sustainability Constellation Pilot Project FY12 Summary Report  

SciTech Connect (OSTI)

Summary report for Light Water Reactor Sustainability (LWRS) activities related to the R. E. Ginna and Nine Mile Point Unit 1 for FY12.

R. Johansen

2012-09-01T23:59:59.000Z

148

BP Cherry Point Congeneration Project  

Broader source: Energy.gov (indexed) [DOE]

Responses to Comments Responses to Comments DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers August 2004 Volume 2 TABLE OF CONTENTS Page ACRONYMS AND ABBREVIATIONS ......................................................................................................... i 1. INTRODUCTION TO VOLUME 2, RESPONSES TO COMMENTS ....................................... 1 1.1 Background .............................................................................................................................. 1 1.2 Organization of Volume 2 ....................................................................................................... 1 1.3 References Cited in Volume 2.................................................................................................

149

END POINTS MANAGEMENT End Points Management The Need for End Point Specifications  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT MANAGEMENT End Points Management The Need for End Point Specifications The Need for a Method to Derive End Points Guiding Principles for Specifying End Points Tailored Approach Headquarters, Field Office, and Contractor Roles End Points Approvals Contractor Organization Functions for End Points Implementation Training and Walkdown Guidance for the Facility Engineers The Need for End Point Specifications The policy of the EM is that a formal project management approach be used for the planning, managing, and conducting of its projects. A fundamental premise of project management for facility deactivation is answering the question: How do you know when the project is complete? Just as the design specifications are essential to a

150

Three Mile Island accident and post-accident recovery: what did we learn  

SciTech Connect (OSTI)

A description of the accident at Three Mile Island-2 reactor is presented. Activities related to the cleanup and decontamination of the reactor are described.

Collins, E.D.

1982-01-01T23:59:59.000Z

151

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

11 North American Power Group, Ltd. 11 North American Power Group, Ltd. November 17, 2011 North American Power Group, Ltd. Two Elk Energy Park Carbon Site Characterization Study Preliminary Geologic Model-Update DOE NETL Annual Meeting November, 15-17, 2011 North American Power Group Copyright 2011 NAPG Two Elk Project Location 2 North American Power Group Copyright 2011 NAPG Work Flow and Project Integration 3 North American Power Group Copyright 2011 NAPG Modeling Approach  Model basin architecture is basically constructed from data within a 25 x 25 mile square area  Geologists reviewed data and correlated tops and surfaces  Porosity, permeability, petrophysics and other information correlated from that data to create a baseline model  Additional data has yet to be added from seismic information and from on-site penetrations

152

Vegetation survey of Four Mile Creek wetlands. [Savannah River Plant  

SciTech Connect (OSTI)

A survey of forested wetlands along upper Four Mile Creek was conducted. The region from Road 3 to the creek headwaters was sampled to evaluate the composition of woody and herbaceons plant communities. All sites were found to fall into either the Nyssa sylvatica (Black Gum) -- Persea borbonia (Red Bay) or Nyssa sylvatica -- Acer rubrum (Red Maple) types. These community types are generally species-rich and diverse. Previous studies (Greenwood et al., 1990; Mackey, 1988) demonstrated contaminant stress in areas downslope from the F- and H-Area seepage basins. In the present study there were some indications of contaminant stress. In the wetland near H-Area, shrub basal area, ground cover stratum species richness, and diversity were low. In the area surrounding the F-Area tree kill zone, ground cover stratum cover and shrub basal area were low and ground cover stratum species richness was low. The moderately stressed site at F-Area also showed reduced overstory richness and diversity and reduced ground cover stratum richness. These results could, however, be due to the very high basal area of overstory trees in both stressed F-Area sites that would reduce light availability to understory plants. No threatened or endangered plant species were found in the areas sampled. 40 refs., 4 figs., 8 tabs.

Loehle, C.

1990-11-01T23:59:59.000Z

153

PowerPoint Presentation  

Energy Savers [EERE]

Resiliency A p r i l 2 9 , 2 0 1 4 Natural Gas Systems: Pipeline Infrastructure 2.4 million miles natural gas pipelines Transmission: 300,000 miles * Natural gas "highways" -...

154

A slow comeback (clean up at the damaged Three Mile Island Unit 2 reactor)  

SciTech Connect (OSTI)

This article reports on the progress that has been made in cleaning up the damaged Three Mile Island Unit 2 reactor, with radioactive debris present not only in the reactor core, but throughout the primary cooling system. Delays in the cleanup operation have been caused by extraordinary technical challenges, regulatory procedures, and funding shortages. The initial stabilization and decontamination of the containment building, which included the removal and processing of the radioactive water, are essentially complete. Reactor disassembly and defueling have yet to begin. The NRC has reported that radiation doses at Unit 2 since the accident have been lower than those experienced at operating reactors, but the estimates for the collective radiation exposure for the work force have recently increased. The NRC has proposed that if robotic devices are used in the defueling and decontamination processes, work-force exposure could be cut by more than half. The projected completion rates for defueling Unit 2 and decontaminating the containment building now range from 1990 to past the year 2000. A five-part inspection program was conducted that included the use of video and sonar probes inside the reactor vessel, and the gathering of debris samples from the core.

Adam, J.A.

1984-04-01T23:59:59.000Z

155

Lessons learned from the Three Mile Island Unit 2 Advisory Panel  

SciTech Connect (OSTI)

In response to public concern about the cleanup of the Three Mile Island, Unit 2 (TMI-2) facility after an accident on March 28, 1979 involving a loss of reactor coolant and subsequent damage to the reactor fuel, twelve citizens were asked to serve on an independent Advisory Panel to consult with the Nuclear Regulatory Commission (NRC) on the decontamination and cleanup of the facility. The panel met 78 times over a period of thirteen years, holding public meetings in the vicinity of TMI-2 and meeting regularly with NRC Commissioners in Washington, DC. This report describes the results of a project designed to identify and describe the lessons learned from the Advisory Panel and place those lessons in the context of what we generally know about citizen advisory groups. A summary of the empirical literature on citizen advisory panels is followed by a brief history of the TMI-2 Advisory Panel. The body of the report contains the analysis of the lessons learned, preliminary conclusions about the effectiveness of the Panel, and implications for the NRC in the use of advisory panels. Data for the report include meeting transcripts and interviews with past and present Panel participants.

Lach, D.; Bolton, P.; Durbin, N. [Battelle Seattle Research Center, WA (United States); Harty, R. [Pacific Northwest Lab., Richland, WA (United States)

1994-08-01T23:59:59.000Z

156

John Day River Subbasin Fish Habitat Enhancement Project, 2005-2006 Annual Report.  

SciTech Connect (OSTI)

Work undertaken in 2005 included: (1) Four new fence projects were completed thereby protecting 7.55 miles of stream with 9.1 miles of new riparian fence (2) Fence removal 1.7 miles of barbed wire. (3) Completed three spring developments (repair work on two BLM springs on Cottonwood Creek (Dayville), 1 solar on Rock Creek/ Collins property). (4) Dredge tail leveling completed on 0.9 miles of the Middle Fork of the John Day River (5) Cut, hauled and placed 30 junipers on Indian Creek/Kuhl property for bank stability. (6) Collected and planted 1500 willow cuttings on Mountain Creek/Jones property. (7) Conducted steelhead redd counts on Lake Cr./Hoover property and Cottonwood Cr./Mascall properties (8) Seeded 200 lbs of native grass seed on projects where the sites were disturbed by fence construction activities. (9) Maintenance of all active project fences (72.74 miles), watergaps (60), spring developments (30) were checked and repairs performed. (10) Since the initiation of the Fish Habitat Program in 1984 we have installed 156.06 miles of riparian fence on leased property protecting 88.34 miles of anadromous fish bearing stream. With the addition of the Restoration and Enhancement Projects from 1996-2001, where the landowner received the materials, built and maintained the project we have a total of 230.92 miles of fence protecting 144.7 miles of stream and 3285 acres of riparian habitat.

Powell, Russ M.; Alley, Pamela D.; Delano, Kenneth H. (Oregon Department of Fish and Wildlife, John Day, OR)

2006-03-01T23:59:59.000Z

157

B3 Trains Problem Statement The train problem assumes a circular track 101 miles in circumference. The track is labeled clockwise in  

E-Print Network [OSTI]

B3 Trains ­ Problem Statement The train problem assumes a circular track 101 miles in circumference be at the same spot as mile 0. One train starts at mile 0 going clockwise, another train starts at mile 100 going counterclockwise. The program prompts for speeds of each train in mph. The output is the mile (or fraction

Huth, Michael

158

DOE/EIS-0324; Umatilla Generating Project (082001)  

Broader source: Energy.gov (indexed) [DOE]

Umatilla Generating Company Umatilla Generating Company UMATILLA GENERATING PROJECT Project Location Map March 2001 Figure 2.1 N S S U m a tilla R . Umatilla Hermiston " # 1 $ " # 0 $ 0.5 0 0.5 1 Kilometers 0.5 0 0.5 1 Miles GTN Intertie BPA Interconnection Point Existing Transmission Line to be Reconductored Water and Gas Pipeline Corridor New Transmission Line on New Towers Existing Transmission Line to be Reconductored Proposed GTN Gas Pipeline Alternative 1 Proposed GTN Gas Pipeline Alternative 2 Proposed CNG Gas Pipeline Alternative Existing PG&E GTN Mainline Power Plant Site Hermiston Generating Plant Water and Gas Pipeline Corridor Print Date: March 28, 2001 k:\umatilla_new\apr\eis_sec2.apr 1:55000 Umatilla Chemical Depot Co lu m b ia R iv e r Hermiston Pendleton Portland Eugene " # / $ ) 9 " # 1 $ Overview of Location in the State of Oregon

159

Rock Sampling At Seven Mile Hole Area (Larson, Et Al., 2009) | Open Energy  

Open Energy Info (EERE)

Seven Mile Hole Area (Larson, Et Al., 2009) Seven Mile Hole Area (Larson, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Rock Sampling At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Rock Sampling Activity Date Usefulness not indicated DOE-funding Unknown Notes The distribution of hydrothermally altered rocks was mapped over about 1 km2 in the Sevenmile Hole area. Two to four kilogram hand samples located by a handheld GPS were collected from many outcrops for laboratory analyses References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The

160

960 x 932 km (576 x 559.2 miles) As big across as Texas  

E-Print Network [OSTI]

of Liberty! 25143 Itokowa 0.54 x 0.27 x .21 km (0.324 x 0.162 x 0.126 miles) size of the Golden Gate Bridge

Waliser, Duane E.

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Fact #860 February 16, 2015 Relationship of Vehicle Miles of Travel and the Price of Gasoline  

Broader source: Energy.gov [DOE]

The prices of gasoline and diesel fuel affect the transportation sector in many ways. For example, fuel prices can impact the number of miles driven and affect the choices consumers make when...

162

Fact #552: January 5, 2009 Vehicle Miles of Travel by Region  

Broader source: Energy.gov [DOE]

Total vehicle miles of travel (VMT) in the U.S. have declined from 2007 to 2008. The latest data available, September 2008, shows a 4.4% decline in travel that varies by region. Comparing September...

163

Fact #670: April 11, 2011 Vehicle-Miles of Travel Rises in 2010  

Broader source: Energy.gov [DOE]

The preliminary estimates from the Federal Highway Administration show that vehicle-miles of travel (VMT) increased slightly in 2010 over the previous year, but have not surpassed the peak of 3.03...

164

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

165

Fact #728: May 21, 2012 Average Trip Length is Less Than Ten Miles  

Broader source: Energy.gov [DOE]

The average trip length (one-way) is 9.7 miles according to the 2009 Nationwide Personal Transportation Survey. Trip lengths vary by the purpose of the trip. Shopping and family/personal business...

166

Field Mapping At Seven Mile Hole Area (Larson, Et Al., 2009) | Open Energy  

Open Energy Info (EERE)

Seven Mile Hole Area (Larson, Et Al., 2009) Seven Mile Hole Area (Larson, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Field Mapping Activity Date Usefulness not indicated DOE-funding Unknown Notes The distribution of hydrothermally altered rocks was mapped over about 1 km2 in the Sevenmile Hole area. Two to four kilogram hand samples located by a handheld GPS were collected from many outcrops K735for laboratory analyses References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The

167

Project Management Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

168

Umatilla River Basin Anadromous Fsh Habitat Enhancement Project : 2000 Annual Report.  

SciTech Connect (OSTI)

The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2000 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla River Basin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Habitat enhancement projects continued to be maintained on 44 private properties, four riparian easements and one in-stream enhancement agreement were secured, two new projects implemented and two existing projects improved to enhance anadromous fish habitat and natural fisheries production capabilities in the Umatilla River Basin. New project locations included sites on the mid Umatilla River and Buckaroo Creek. Improvements were implemented at existing project sites on the upper Umatilla River and Wildhorse Creek. A stream bank stabilization project was implemented at approximately River Mile 37.4 Umatilla River to stabilize 760 feet of eroding stream bank and improve in-stream habitat diversity. Habitat enhancements at this site included construction of six rock barbs with one large conifer root wad incorporated into each barb, stinging approximately 10,000 native willow cuttings, planting 195 tubling willows and 1,800 basin wildrye grass plugs, and seeding 40 pounds of native grass seed. Staff time to assist in development of a subcontract and fence materials were provided to establish eight spring sites for off-stream watering and to protect wetlands within the Buckaroo Creek Watershed. A gravel bar was moved and incorporated into an adjacent point bar to reduce stream energy and stream channel confinement within the existing project area at River Mile 85 Umatilla River. Approximately 10,000 native willow cuttings were stung and trenched into the stream channel margins and stream banks, and 360 basin wildrye grass plugs planted and 190 pounds of native grass seed broadcast on terraces between River Mile 10 and 12.5 within the existing Wildhorse Creek Project Area. Approximately 70 pounds of native grasses were seeded in the existing McKay Creek Project Area at approximately River Mile 21.5. Financial and in-kind cost share assistance was provided by the Confederated Tribes of the Umatilla Indian Reservation, U.S. Bureau of Indian Affairs, U.S. Department of Agriculture, U.S. Fish and Wildlife Service, National Fish and Wildlife Federation and the Umatilla National Forest for the enhancements at River Mile 37.4 Umatilla River and within the Buckaroo Creek Watershed. Monitoring continued to quantify effects of habitat enhancements in the upper basin. Maximum, minimum and average daily stream temperatures were collected from June through September at 22 sites. Suspended sediment samples were obtained at three gage stations to arrive at daily sediment load estimates. Photographs were taken at 94 existing and two newly established photo points to document habitat recovery. Umatilla Basin Watershed Assessment efforts were continued under a subcontract with Washington State University. This endeavor involves compiling existing information, identifying data gaps, determining habitat-limiting factors and recommending actions to improve anadromous fisheries habitat. This watershed assessment document and working databases will be completed in fiscal year 2002 and made available to assist project personnel with sub-watershed prioritization of habitat needs.

Shaw, R. Todd

2001-12-31T23:59:59.000Z

169

BPA, Transmission, I-5 Corridor Reinforcement Project, abbreviated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 9 Benefits of a new line Keeps the lights...

170

Argonne leads hydrogen storage project  

Science Journals Connector (OSTI)

A new $1.88m research project on on-board hydrogen storage at the US Department of Energy's Argonne National Laboratory in Illinois aims to develop a hydrogen storage system that can hold enough hydrogen for a driving range of 300 miles (480 km).

2007-01-01T23:59:59.000Z

171

Project Cost The Bondo District is  

E-Print Network [OSTI]

their livelihood. Community members dig wells up to 200 feet deep by hand to find water, or walk miles to Lake building materials for fu- ture use in the project. It was confirmed that much of the water is contaminated members can treat their water on an individual basis. The project will be considered successful when

Reisslein, Martin

172

DSW Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

173

Isotopic Analysis At Seven Mile Hole Area (Larson, Et Al., 2009) | Open  

Open Energy Info (EERE)

2009) 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis- Rock At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Isotopic Analysis- Rock Activity Date Usefulness useful DOE-funding Unknown Notes The 40Ar/39Ar data were collected from a single fragment of alunite from sample Y-05-25, approximately 0.5 cm3 in size. References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Retrieved from "http://en.openei.org/w/index.php?title=Isotopic_Analysis_At_Seven_Mile_Hole_Area_(Larson,_Et_Al.,_2009)&oldid=68747

174

Toward 300 Miles on a Single Charge? | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Toward 300 Miles on a Single Charge? Toward 300 Miles on a Single Charge? Discovery & Innovation Stories of Discovery & Innovation Brief Science Highlights SBIR/STTR Highlights Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 11.27.13 Toward 300 Miles on a Single Charge? Berkeley Lab scientists design a high-performance, long cycle-life lithium-sulfur battery. Print Text Size: A A A Subscribe FeedbackShare Page Click to enlarge photo. Enlarge Photo Scanning electron microscope image of sulfur graphene oxide. Photo courtesy of Lawrence Berkeley National Laboratory Scanning electron microscope image of sulfur graphene oxide. The batteries that pervade your life these days-from your cell phone to your sleek new tablet and even to your automobile, if you happen to drive

175

Modeling the Last Mile of the Smart Grid G.A. Pagani  

E-Print Network [OSTI]

Modeling the Last Mile of the Smart Grid G.A. Pagani Johann Bernoulli Institute of Mathematics in the grid and allowing for micro-production to be part of the smart grid. Such changes will have a major- archical, unidirectional and capillary, though the new smart grid scenario calls for an infrastructure

Aiello, Marco

176

Crisis contained, The Department of Energy at Three Mile Island: a history  

SciTech Connect (OSTI)

An account is given of the response of US DOE to the Three Mile Island-2 accident on March 28, 1979. The accident is treated as though it was a military battle. A synoptic chronologgy of the accident events and of DOE and other responses is included. (DLC)

Cantelon, P L; Williams, R C

1980-12-01T23:59:59.000Z

177

Invisibility Cloaking via Non-Smooth Transformation Optics and Ray Miles M. Crosskey  

E-Print Network [OSTI]

Invisibility Cloaking via Non-Smooth Transformation Optics and Ray Tracing Miles M. Crosskey of theoretically-predicted invisibility cloaks with shapes other than spheres and cylin- ders, including cones explicitly displaying the non-uniqueness of invisibility cloaks of the same shape. We depict rays propagating

Kovacic, Gregor

178

Fact #616: March 29, 2010 Household Vehicle-Miles of Travel by Trip Purpose  

Broader source: Energy.gov [DOE]

In 2009, getting to and from work accounted for about 27% of household vehicle-miles of travel (VMT). Work-related business was 8.4% of VMT in 2001, but declined to 6.7% in 2009, possibly due to...

179

Global Change and Climate Change by Miles R. Silman, Ph.D.  

E-Print Network [OSTI]

, the answer illustrates of the power of biogeochemistry. Water cycles between three compartments, ocean (by of one city In the early spring of 1889, we learned an important lesson--our first lesson--in what computers.The oceans are a reservoir of about 1.35 billion cubic kilometers (322 million cubic miles

Silman, Miles R.

180

DISCOVERY OF A DYNAMICAL COLD POINT IN THE HEART OF THE SAGITTARIUS dSph GALAXY WITH OBSERVATIONS FROM THE APOGEE PROJECT  

SciTech Connect (OSTI)

The dynamics of the core of the Sagittarius (Sgr) dwarf spheroidal (dSph) galaxy are explored using high-resolution (R ? 22, 500), H-band, near-infrared spectra of over 1000 giant stars in the central 3 deg{sup 2} of the system, of which 328 are identified as Sgr members. These data, among some of the earliest observations from the Sloan Digital Sky Survey III/Apache Point Observatory Galactic Evolution Experiment (APOGEE) and the largest published sample of high resolution Sgr dSph spectra to date, reveal a distinct gradient in the velocity dispersion of Sgr from 11 to 14 km s{sup 1} for radii >0.8 from center to a dynamical cold point of 8 km s{sup 1} in the Sgr centera trend differing from that found in previous kinematical analyses of Sgr over larger scales that suggests a more or less flat dispersion profile at these radii. Well-fitting mass models with either cored and cusped dark matter distributions can be found to match the kinematical results, although the cored profile succeeds with significantly more isotropic stellar orbits than required for a cusped profile. It is unlikely that the cold point reflects an unusual mass distribution. The dispersion gradient may arise from variations in the mixture of populations with distinct kinematics within the dSph; this explanation is suggested (e.g., by detection of a metallicity gradient across similar radii), but not confirmed, by the present data. Despite these remaining uncertainties about their interpretation, these early test data (including some from instrument commissioning) demonstrate APOGEE's usefulness for precision dynamical studies, even for fields observed at extreme airmasses.

Majewski, Steven R.; Hasselquist, Sten; Nidever, David L., E-mail: srm4n@virginia.edu, E-mail: sh6cy@virginia.edu [Department of Astronomy, University of Virginia, Charlottesville, VA 22904-4325 (United States); and others

2013-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

John Nangle, National Renewable Energy Laboratory (NREL) John Nangle, National Renewable Energy Laboratory (NREL) Tribal Leader Forum, Phoenix, AZ - May 30 - 31, 2013 State Incentives and Project Impacts Main Points - Market Context * State Renewable Portfolio Standards (RPS) - What are they? - How can they help your project? - Potential gap means more market demand for RE projects Starting a Renewable Energy Project * What renewable resources exist? * What sites with resources do you own? * To whom will you sell the electricity? * How will federal and state incentives or policies impact your project? * Access to transmission * Other policies - Interconnection standards - Environmental standards Renewable Portfolio Standard (RPS) * A requirement set by a state for utilities to generate x% of electricity from renewables by a specific date

182

DOE/EIS-0285/SA-133: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Hanford-Ostrander [Mile 126/1-146/4] (3/20/03)  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-133 Hanford-Ostrander [Mile 126/1-146/4] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. Location: The project location is within Skamania County, Washington. The project commences to the west of the White Salmon River and proceeds in a westerly directly for approximately 20 miles. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

183

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Windy Gap Firming Project Windy Gap Firming Project Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOE/EIS-0370 (cooperating agency) Western's proposed action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line would be moved outside the area proposed for the reservoir, and Western would ensure the new location would allow the agency to continue to operate and maintain it. Section 2.4.1.4 of the Final Environmental Impact Statement, Volume 1 provides more information on the transmission line relocation proposal. The U.S. Department of the Interior, Bureau of Reclamation is the Lead Agency for the National Environmental Policy Act Review. Cooperating agencies are Western, the U.S. Army Corps of Engineers and Grand County, Colo.

184

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

185

MHK Projects | Open Energy Information  

Open Energy Info (EERE)

MHK Projects MHK Projects Jump to: navigation, search << Return to the MHK database homepage Click one of the following Marine Hydrokinetic Projects for more information: Loading... 40MW Lewis project ADM 3 ADM 4 ADM 5 AW Energy EMEC AWS II Admirality Inlet Tidal Energy Project Agucadoura Alaska 1 Alaska 13 Alaska 17 Alaska 18 Alaska 24 Alaska 25 Alaska 28 Alaska 31 Alaska 33 Alaska 35 Alaska 36 Alaska 7 Algiers Cutoff Project Algiers Light Project Amity Point Anconia Point Project Angoon Tidal Energy Plant Aquantis Project Ashley Point Project Astoria Tidal Energy Atchafalaya River Hydrokinetic Project II Avalon Tidal Avondale Bend Project BW2 Tidal Bar Field Bend Barfield Point Bayou Latenache Belair Project Belleville BioSTREAM Pilot Plant Bluemill Sound Bondurant Chute Bonnybrook Wastewater Facility Project 1

186

Answers to frequently asked questions about cleanup activities at Three Mile Island, Unit 2. Public information report  

SciTech Connect (OSTI)

The document presents answers to frequently asked questions about plans for cleanup and decontamination activities at Three Mile Island, Unit 2. Answers to the questions asked are based on information in the NRC 'Draft Programmatic Environmental Impact Statement related to decontamination and disposal of radioactive wastes resulting from March 28, 1979, accident, Three Mile Island Nuclear Station, Unit 2,' NUREG-0683.

Not Available

1980-09-01T23:59:59.000Z

187

Compound and Elemental Analysis At Seven Mile Hole Area (Larson, Et Al.,  

Open Energy Info (EERE)

2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Compound and Elemental Analysis At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Compound and Elemental Analysis Activity Date Usefulness not indicated DOE-funding Unknown Notes Standard X-ray diffractometer (XRD) analyses were used in the laboratory to confirm the PIMA mineral identifications and to look for minerals that have poor SWIR response (e.g., quartz and feldspars) or were not present in great enough concentrations to be detected by the PIMA. Petrographic and electron microprobe analyses of selected samples were conducted in the laboratories of the GeoAnalytical Laboratory at Washington State

188

"Table 11. Fuel Economy, Selected Survey Years (Miles Per Gallon)"  

U.S. Energy Information Administration (EIA) Indexed Site

Fuel Economy, Selected Survey Years (Miles Per Gallon)" Fuel Economy, Selected Survey Years (Miles Per Gallon)" ,"Survey Years" ,1983,1985,1988,1991,1994,2001 "Total",15.1,16.1,18.3,19.3,19.8,20.2 "Household Characteristics" "Census Region and Division" " Northeast",15.6,"NA",19.6,20.9,20.7,20.85531 " New England",16.5,"NA",19.7,21.1,20.4,20.97907 " Middle Atlantic ",15.3,"NA",19.6,20.8,20.8,20.79659 " Midwest ",14.8,"NA",18.2,19,20.1,20.18362 " East North Central",14.9,"NA",18.4,19.4,20.1,20.26056 " West North Central ",14.5,"NA",17.8,17.9,20,20.01659 " South",15,"NA",18,19.2,19.6,20.17499 " South Atlantic",15.6,"NA",19,20.2,20.2,20.5718

189

Greater commitment needed to solve continuing problems at Three Mile Island. Report to the Congress  

SciTech Connect (OSTI)

The Nation's first major accident at a commercial nuclear-powered electricity generating station occurred at Three Mile Island over 2 years ago, yet the resolution of the resultant problems is still subject to regulatory and financial uncertainty. Consequently, little progress has been made to clean up the damaged facility or alleviate the extreme financial stress placed upon its owners. The remedies required to resolve the continuing problems at Three Mile Island will require unprecedented coordination and commitment by Federal and State regulatory bodies, the electric utility industry, the financial community, and the owners of the damaged facility. To safeguard against similar problems in the future, the Nuclear Regulatory Commission should develop accident recovery guidelines and ensure that increased property insurance coverage is available for nuclear facilities.

Not Available

1981-08-26T23:59:59.000Z

190

Answers to questions about updated estimates of occupational radiation doses at Three Mile Island, Unit 2  

SciTech Connect (OSTI)

The purpose of this question and answer report is to provide a clear, easy-to-understand explanation of revised radiation dose estimates which workers are likely to receive over the course of the cleanup at Three Mile Island, Unit 2, and of the possible health consequences to workers of these new estimates. We will focus primarily on occupational dose, although pertinent questions about public health and safety will also be answered.

Not Available

1983-12-01T23:59:59.000Z

191

Criticality prevention during postaccident decontamination of TMI-2 (Three Mile Island Unit 2) plant systems  

SciTech Connect (OSTI)

Following the accident at Three Mile Island Unit 2 (TMI-2), the likelihood of a criticality outside of the reactor coolant system (RCS) during the plant cleanup was very small. Given the consequence of any possible critical event in the TMI-2 systems, However, it was always necessary to ensure that all steps were taken to prevent criticality. Therefore, engineered controls were developed to ensure that decontamination of plant systems containing fuel material could be conducted in a manner that precluded criticality.

Palau, G. L.

1988-01-01T23:59:59.000Z

192

Table 5.1. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption  

U.S. Energy Information Administration (EIA) Indexed Site

. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption . U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption and Expenditures, 1994 1993 Household and 1994 Vehicle Characteristics RSE Column Factor: Number of Vehicles Vehicle-Miles Traveled Motor Fuel Consumption Motor Fuel Expenditures RSE Row Factor: (million) (percent) (billion) (percent) (billion gallons) (gallon percent) (quadril- lion Btu) (billion dollars) (percent) 0.9 0.8 1.1 1.0 1.1 1.0 1.1 1.1 1.0 Household Characteristics Total .................................................... 156.8 100.0 1,793 100.0 90.6 100.0 11.2 104.7 100.0 2.8 Census Region and Division Northeast ........................................... 26.6 17.0 299 16.7 14.5 16.0 1.8 17.2 16.4 5.7 New England ................................... 7.6 4.8 84 4.7 4.1 4.5 0.5 4.8 4.6 13.8 Middle Atlantic

193

Talking Points  

U.S. Energy Information Administration (EIA) Indexed Site

Talking Points Talking Points NATURAL GAS MARKET INTEGRITY: How EIA Helps Presentation by William F. Hederman Congressional Research Service at EIA 30 th Anniversary Conference April 8, 2008 Washington, DC INTRODUCTION 1. Price levels and volatility cause suspicions. 2. Actual integrity and perceived integrity are both important for markets. 3. EIA was created in response to a crisis of confidence in energy market information. CANDIDATE INTEGRITY CRITERIA 1. Transparency 2. Efficiency (gathering, reporting, monitoring data) v. equity 3. Stability/predictability v. dynamism/volatility 4. Clarity (understanding) "DRAFT" TEN COMMANDMENTS/SUGGESTIONS 1. First presented at World Energy Congress, Rome, Nov. 2007 panel on Energy Market Integrity.

194

Property:Project Resource | Open Energy Information  

Open Energy Info (EERE)

Project Resource Project Resource Jump to: navigation, search Property Name Project Resource Property Type Text Pages using the property "Project Resource" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + Wave MHK Projects/ADM 3 + Wave MHK Projects/ADM 4 + Wave MHK Projects/ADM 5 + Wave MHK Projects/AWS II + Wave MHK Projects/Agucadoura + Wave MHK Projects/Alaska 13 + Current /Tidal MHK Projects/Alaska 35 + Current /Tidal MHK Projects/Algiers Light Project + Current /Tidal MHK Projects/Anconia Point Project + Current /Tidal MHK Projects/Ashley Point Project + Current /Tidal MHK Projects/Astoria Tidal Energy + Current /Tidal MHK Projects/Atchafalaya River Hydrokinetic Project II + Current /Tidal MHK Projects/Avalon Tidal + Current /Tidal

195

PORTSMOUTH HARBOR AND PISCATAQUA RIVER, NH & ME NAVIGATION IMPROVEMENT PROJECT  

E-Print Network [OSTI]

the states of New Hampshire and Maine. The existing project consists of 35-foot deep entrance channel, with a minimum width of 400 feet, extending about 6.2 miles from deep water at the harbor entrance upriverPORTSMOUTH HARBOR AND PISCATAQUA RIVER, NH & ME NAVIGATION IMPROVEMENT PROJECT 21 August 2014

US Army Corps of Engineers

196

EAMidnightPointMahogany  

Broader source: Energy.gov (indexed) [DOE]

Assessment Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon April 2013 Prepared By Bureau of Land Management - Prineville and Burns Districts DOI-BLM-OR-P040-2011-0021-EA DOE/EA-1925 Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon April 2013 Lead Agency United States Department of the Interior Bureau of Land Management Prineville District 3050 N.E. 3rd Street, Prineville, OR 97754 Tel: 541 416 6700 Burns District 28910 Hwy 20 West, Hines, OR 97738 Tel: 541 573 4400 Cooperating Agency United States Department of Energy Golden Field Office Golden, Colorado 80401 Tel: 720-356-1563 Fax: 720-356-1560 April 2013 Environmental Assessment Table of Contents 1

197

Project Title: VIscosity Reduction Date:  

Broader source: Energy.gov (indexed) [DOE]

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

198

Impact of fuel price on vehicle miles traveled (VMT): do the poor respond in the same way as the rich?  

Science Journals Connector (OSTI)

The effects of fuel price on travel demand for different income groups ... choices and constraints by examining the variation of fuel price elasticity of vehicle miles travelled (VMT) ... in VMT as a result of im...

Tingting Wang; Cynthia Chen

2014-01-01T23:59:59.000Z

199

Fact #848: November 24, 2014 Nearly Three-Fourths of New Cars have Fuel Economy above 25 Miles per Gallon  

Broader source: Energy.gov [DOE]

In 1975, only three percent of all new cars had a fuel economy above 25 miles per gallon (mpg), but by 2014, 73% did. Great improvements were made in the fuel economy of cars from 1975 to 1985, so...

200

EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana , Hettinger, North Dakota , and New Underwood , South Dakota , in Custer and Fallon Counties in Montana, Adams , Bowman , and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

John Day River Sub-Basin Fish Habitat Enhancement Project; 2008 Annual Report  

SciTech Connect (OSTI)

Work undertaken in 2008 included: (1) Seven new fence projects were completed thereby protecting approximately 10.97 miles of streams with 16.34 miles of riparian fence; (2) Renewal of one expired lease was completed thereby continuing to protect 0.75 miles of stream with 1.0 mile of riparian fence. (3) Maintenance of all active project fences (106.54 miles), watergaps (78), spring developments (33) were checked and repairs performed; (3) Planted 1000 willow/red osier on Fox Creek/Henslee property; (4) Planted 2000 willows/red osier on Middle Fork John Day River/Coleman property; (5) Planted 1000 willow/red osier cuttings on Fox Creek/Johns property; (6) Since the initiation of the Fish Habitat Project in 1984 we have 126.86 miles of stream protected using 211.72 miles of fence protecting 5658 acres. The purpose of the John Day Fish Habitat Enhancement Program is to enhance production of indigenous wild stocks of spring Chinook and summer steelhead within the sub basin through habitat protection, enhancement and fish passage improvement. The John Day River system supports the largest remaining wild runs of spring chinook salmon and summer steelhead in Northeast Oregon.

Powell, Russ M.; Alley, Pamela D.; Goin Jr, Lonnie [Oregon Department of Fish and Wildlife

2009-07-15T23:59:59.000Z

202

White Creek Wind Power Project | Open Energy Information  

Open Energy Info (EERE)

White Creek Wind Power Project White Creek Wind Power Project Facility White Creek Wind Power Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Last Mile Electric Cooperative Developer Last Mile Electric Cooperative Energy Purchaser Last Mile Electric Cooperative Location Klickitat County Coordinates 45.853153°, -120.289578° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.853153,"lon":-120.289578,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

203

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

204

Laboratory measurement verification of laser hazard analysis for miles weapon simulators used in force on force exercises.  

SciTech Connect (OSTI)

Due to the change in the batteries used with the Small Arm Laser Transmitters (SALT) from 3-volts dc to 3.6-volts dc and changes to SNL MILES operating conditions, the associated laser hazards of these units required re-evaluation to ensure that the hazard classification of the laser emitters had not changed as well. The output laser emissions of the SNL MILES, weapon simulators and empire guns, used in Force-On-Force (FOF) training exercises, was measured in accordance to the ANSI Standard Z136.4-2005, ''Recommended Practice for Laser Safety Measurements for Hazard Evaluation''. The laser hazard class was evaluated in accordance with the ANSI Standard Z136.1-2000, ''Safe Use of Lasers'', using ''worst'' case conditions associated with these MILES units. Laser safety assessment was conducted in accordance with the ANSI Standard Z136.6-2005, ''Safe Use of Lasers Outdoors''. The laser hazard evaluation of these MILES laser emitters was compared to and supersedes SAND Report SAND2002-0246, ''Laser Safety Evaluation of the MILES and Mini MILES Laser Emitting Components'', which used ''actual'' operating conditions of the laser emitters at the time of its issuance.

Augustoni, Arnold L.

2006-08-01T23:59:59.000Z

205

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129) Ashe-Marion #2 [Mile 150-157]  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129 Ashe-Marion #2 [Mile 150-157] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7 (reference line). The Buckley-Marion #1 transmission line is also present within the proposed corridor. Right of way width averages 135 feet. Location: The project location is within Wasco County, Oregon near the city of Pine Grove, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

206

Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) - Infrastructure Rehabilitation - Final  

E-Print Network [OSTI]

of Reclamation (BOR). The proposed project involves rehabilitating 42+ miles of canals, laterals, and pipelines. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.; Popp, Michael C.

207

Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) Infrastructure Rehabilitation Preliminary  

E-Print Network [OSTI]

of Reclamation (BOR). The proposed project involves rehabilitating 42+ miles of canals, laterals, and pipelines. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

208

Seven Mile Hill I & II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

I & II Wind Farm I & II Wind Farm Jump to: navigation, search Name Seven Mile Hill I & II Wind Farm Facility Seven Mile Hill I & II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner PacifiCorp Developer PacifiCorp Energy Purchaser PacifiCorp Location Between Hanna and Medicine Bow WY Coordinates 41.939079°, -106.372225° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.939079,"lon":-106.372225,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

209

Lessons Learned from Three Mile Island Packaging, Transportation and Disposition that Apply to Fukushima Daiichi Recovery  

SciTech Connect (OSTI)

Following the massive earthquake and resulting tsunami damage in March of 2011 at the Fukushima Daiichi nuclear power plant in Japan, interest was amplified for what was done for recovery at the Three Mile Island Unit 2 (TMI-2) in the United States following its meltdown in 1979. Many parallels could be drawn between to two accidents. This paper presents the results of research done into the TMI-2 recovery effort and its applicability to the Fukushima Daiichi cleanup. This research focused on three topics: packaging, transportation, and disposition. This research work was performed as a collaboration between Japans Central Research Institute of Electric Power Industry (CRIEPI) and the Idaho National Laboratory (INL). Hundreds of TMI-2 related documents were searched and pertinent information was gleaned from these documents. Other important information was also obtained by interviewing employees who were involved first hand in various aspects of the TMI-2 cleanup effort. This paper is organized into three main sections: (1) Transport from Three Mile Island to Central Facilities Area at INL, (2) Transport from INL Central Receiving Facility to INL Test Area North (TAN) and wet storage at TAN, and (3) Transport from TAN to INL Idaho Nuclear Technology and Engineering Center (INTEC) and Dry Storage at INTEC. Within each of these sections, lessons learned from performing recovery activities are presented and their applicability to the Fukushima Daiichi nuclear power plant cleanup are outlined.

Layne Pincock; Wendell Hintze; Dr. Koji Shirai

2012-07-01T23:59:59.000Z

210

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

211

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

212

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

213

PROJECT MANAGEMENT PLANS Project Management Plans  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

214

Microsoft PowerPoint - Entergy-Hydro-Operations_Smethers [Compatibility Mode]  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ouachita River System Ouachita River System LAKE OUACHITA CITY OF HOT SPRINGS LAKE CATHERINE Blakely Mountain Dam LAKE HAMITLON Carpenter Dam Remmel Dam 1 OUACHITA RIVER DeGray Lake & Dam Blakely Mtn. Dam/Lake Ouachita * Built in 1955 * forms Lake Ouachita * Owned & Operated by ACOE * 2 Units - 6600 CFS * 84 MW @178 ft. Head * AGC Capable Large volume of water * Large volume of water storage * Flood Control is a project purpose 2 project purpose Lake Hamilton / Lake Catherine * 6,897 acres surface * 198 miles shoreline * 1,642 acres surface * 56 miles shoreline * 198 miles shoreline * 70% shoreline developed * 50% of shoreline developed developed * 3,863 docks * 10 270 buildings * 399 docks * 1,391 buildings * 10,270 buildings within 500 ft. of shoreline , g within 500 ft. of shoreline 3 * Highly Developed * Highly Developed

215

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

216

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |  

Broader source: Energy.gov (indexed) [DOE]

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup More Documents & Publications

217

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |  

Broader source: Energy.gov (indexed) [DOE]

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup More Documents & Publications

218

EIS-0474: Southline Transmission Project, Arizona and New Mexico |  

Broader source: Energy.gov (indexed) [DOE]

4: Southline Transmission Project, Arizona and New Mexico 4: Southline Transmission Project, Arizona and New Mexico EIS-0474: Southline Transmission Project, Arizona and New Mexico Summary The Department of the Interior's Bureau of Land Management (BLM) and Department of Energy's Western Area Power Administration (Western) are preparing this EIS as joint lead agencies to evaluate the environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations. Project website: http://www.blm.gov/nm/southline.

219

Project Year Project Team  

E-Print Network [OSTI]

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

220

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Environmental Assessment of Proposed Lynch Creek Substation Project : Service to Eatonville and the Ohop Valley.  

SciTech Connect (OSTI)

Bonneville Power Administation (BPA) proposes to construct 3.2 miles of 115-kV transmission line from a tap point on Tacoma City Light's Cowlitz-LaGrande 115-kV line to a new 115/12.5-kV, 15/20/25 MVA substation to be located about 1 mile northwest of Eatonville, adjacent to the Eatonville cutoff road. This plan was selected following initial consideration of five alternative plans for satisfying electrical needs in the project area and following agreement with BPA's customers on a vicinity for the substation site. The vicinity selected is midway between the two load centers and would require the least construction of distribution line. Subsequently, four alternative line routes and two substation sites have been evaluated. These alternatives provide a range of costs, engineering solutions, and potential environmental impacts. This evaluation led to the selection of one line route. This document describes possible environmental impacts of the proposed actions. 7 refs, 9 figs., 5 tabs.

United States. Bonneville Power Administration.

1983-05-01T23:59:59.000Z

222

step toward the project's planned early 2011 startup. The project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

step toward the project's planned early 2011 startup. The project step toward the project's planned early 2011 startup. The project will capture CO 2 from the Archer Daniels Midland (ADM) Ethanol Production Facility and inject it into a deep saline reservoir more than one mile underground. Beginning in early 2011, up to 1 million metric tons of the captured CO 2 will be compressed into a dense, liquid-like state and injected over a three-year period. The Mt. Simon Sandstone, which is the rock formation targeted for the injection, is the thickest and most widespread saline reservoir in the Illinois Basin, with an estimated CO 2 storage capacity as high as 110 billion metric tons. Analysis of the survey data is a key component in the comprehensive monitoring program that will be implemented to ensure the injected

223

Greater commitment needed to solve continuing problems at Three Mile Island  

SciTech Connect (OSTI)

This report examines several key issues involving the financial status of the General Public Utilities Corporation, the need for and source of funding to clean up the damaged nuclear reactor at Three Mile Island, and the prospects for continued reliable electric service to Pennsylvania and New Jersey consumers. It also examines bankruptcy as a solution to the utilities' financial problems, and the need for (1) increased property damage insurance coverage on nuclear reactors, and (2) an improved regulatory environment for nuclear accident recovery efforts. The role of the Federal Government in the accident recovery effort and Congressional support for a Federal research and development program are discussed. It is recommended that the Nuclear Regulatory Commission follow the expansion of property insurance coverage for nuclear units by the private sector and develop guidelines to expedite any future accident recovery efforts.

Not Available

1981-08-26T23:59:59.000Z

224

Analysis of the Three Mile Island Unit 2 hydrogen burn. Volume 4  

SciTech Connect (OSTI)

As a basis for the analysis of the hydrogen burn which occurred in the Three Mile Island Containment on March 28, 1979, a study of recorded temperatures and pressures was made. Long-term temperature information was obtained from the multipoint temperature recorder which shows 12 containment atmosphere temperatures plotted every 6 min. The containment atmosphere pressure recorder provided excellent long- and short-term pressure information. Short-term information was obtained from the multiplex record of 24 channels of data, recorded every 3 sec, and the alarm printer record which shows status change events and prints out temperatures, pressures, and the time of the events. The timing of these four data recording systems was correlated and pertinent data were tabulated, analyzed, and plotted to show average containment temperature and pressure versus time. Photographs and videotapes of the containment entries provided qualitative burn information.

Henrie, J.O.; Postma, A.K.

1983-03-01T23:59:59.000Z

225

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup  

Broader source: Energy.gov (indexed) [DOE]

August 14, 2012 August 14, 2012 AIKEN, S.C. - American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Coun- ties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. "We excavated and disposed of over five million pounds of contaminated soil from three specific sites along the stream, erected miles of fence and placed over 2,000 signs in order to make Lower Three Runs safe and to reduce our site's footprint by another 10 percent," said Chris

226

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

227

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

228

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

229

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

230

VOLUNTARY OBSERVING SHIPS (VOS) CLIMATE SUBSET PROJECT (VOSCLIM) PROJECT DOCUMENT  

E-Print Network [OSTI]

. Data management procedures 8. Project management 9. Information exchange Attachment 1: ScientificWMO IOC JCOMM VOLUNTARY OBSERVING SHIPS (VOS) CLIMATE SUBSET PROJECT (VOSCLIM) PROJECT DOCUMENT #12 Attachment 5: List of focal points Attachment 7: Preliminary action plan #12;PROJECT DOCUMENT

231

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

232

Project Management Principles | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Principles Project Management Principles 304ProjectManagementPrinciples.pdf More Documents & Publications Microsoft PowerPoint - DOE O 413 3B Brief v9 with key points...

233

Fact #854 January 5, 2015 Driving Ranges for All-Electric Vehicles in Model Year 2014 Vary from 62 to 265 Miles Dataset  

Broader source: Energy.gov [DOE]

Excel file with dataset for Driving Ranges for All-Electric Vehicles in Model Year 2014 Vary from 62 to 265 Miles

234

Fact #848: November 24, 2014 Nearly Three-Fourths of New Cars have Fuel Economy above 25 Miles per Gallon- Dataset  

Broader source: Energy.gov [DOE]

Excel file with dataset for Fact #848: November 24, 2014 Nearly Three-Fourths of New Cars have Fuel Economy above 25 Miles per Gallon

235

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

236

Projectivities and Projective Embeddings  

Science Journals Connector (OSTI)

In this chapter, we aim to prove some of the main achievements in the theory of generalized polygons. First, we want to show what the little projective group and the groups of projectivities of some Moufang po...

Hendrik van Maldeghem

1998-01-01T23:59:59.000Z

237

Project Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

238

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

239

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

240

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

242

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

243

QWould fruit and vegetable growers within a 30-mile radius of the Iowa Great Lakes benefit from cooperative marketing  

E-Print Network [OSTI]

cooperative marketing and distribution? AYes, they were able to achieve increases in market venues and sales. Background The Iowa Great Lakes Area possesses tremendous potential for marketing local foods, and very few 40-120 miles away. Growers in the immediate area have relied on the Lakes Area Farmers Market

Debinski, Diane M.

244

Analysis of soil and water at the Four Mile Creek seepline near the F- and H-Areas of SRS  

SciTech Connect (OSTI)

Several soil and water samples were collected along the Four Mile Creek (FMC) seepline at the F and H Areas of the Savannah River Site. The samples were analyzed for concentrations of metals, radionuclides, and inorganic constituents. The results of the analyses are summarized for the soil and water samples.

Haselow, J.S.

2000-05-24T23:59:59.000Z

245

EIS-0443: Project Financing for Southwest Intertie Project- South, Clark, Lincoln, Nye, and White Pine Counties, Nevada  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line.

246

Evaluation of the Three Mile Island Unit 2 reactor building decontamination process  

SciTech Connect (OSTI)

Decontamination activities from the cleanup of the Three Mile Island Unit 2 Reactor Building are generating a variety of waste streams. Solid wastes being disposed of in commercial shallow land burial include trash and rubbish, ion-exchange resins (Epicor-II) and strippable coatings. The radwaste streams arising from cleanup activities currently under way are characterized and classified under the waste classification scheme of 10 CFR Part 61. It appears that much of the Epicor-II ion-exchange resin being disposed of in commerical land burial will be Class B and require stabilization if current radionuclide loading practices continue to be followed. Some of the trash and rubbish from the cleanup of the reactor building so far would be Class B. Strippable coatings being used at TMI-2 were tested for leachability of radionuclides and chelating agents, thermal stability, radiation stability, stability under immersion and biodegradability. Actual coating samples from reactor building decontamination testing were evaluated for radionuclide leaching and biodegradation.

Dougherty, D.; Adams, J. W.

1983-08-01T23:59:59.000Z

247

On making energy demand and network constraints compatible in the last mile of the power grid  

Science Journals Connector (OSTI)

Abstract In the classical electricity grid power demand is nearly instantaneously matched by power supply. In this paradigm, the changes in power demand in a low voltage distribution grid are essentially nothing but a disturbance that is compensated for by control at the generators. The disadvantage of this methodology is that it necessarily leads to a transmission and distribution network that must cater for peak demand. So-called smart meters and smart grid technologies provide an opportunity to change this paradigm by using demand side energy storage to moderate instantaneous power demand so as to facilitate the supply-demand match within network limitations. A receding horizon model predictive control method can be used to implement this idea. In this paradigm demand is matched with supply, such that the required customer energy needs are met but power demand is moderated, while ensuring that power flow in the grid is maintained within the safe operating region, and in particular peak demand is limited. This enables a much higher utilisation of the available grid infrastructure, as it reduces the peak-to-base demand ratio as compared to the classical control methodology of power supply following power demand. This paper investigates this approach for matching energy demand to generation in the last mile of the power grid while maintaining all network constraints through a number of case studies involving the charging of electric vehicles in a typical suburban low voltage distribution network in Melbourne, Australia.

Iven Mareels; Julian de Hoog; Doreen Thomas; Marcus Brazil; Tansu Alpcan; Derek Jayasuriya; Valentin Menzel; Lu Xia; Ramachandra Rao Kolluri

2014-01-01T23:59:59.000Z

248

Estimating commercial truck VMT (vehicle miles of travel) of interstate motor carriers: Data evaluation  

SciTech Connect (OSTI)

This memorandum summarizes the evaluation results of six data sources in terms of their ability to estimate the number of commercial trucks operating in interstate commerce and their vehicle miles of travel (VMT) by carrier type and by state. The six data sources are: (1) Truck Inventory and Use Survey (TIUS) from the Bureau of the Census, (2) nationwide truck activity and commodity survey (NTACS) from the Bureau of the Census, (3) National Truck Trip Information Survey (NTTIS) from the University of Michigan Transportation Research Institute (UMTRI), (4) highway performance monitoring system (HPMS) from the Federal Highway Administration (FHWA), Department of Transportation, (5) state fuel tax reports from each individual state and the international fuel tax agreement (IFTA), and (6) International Registration Plan (IRP) of the American Association of Motor Vehicle Administrators (AAMVA). TIUS, NTACS, and NTTIS are designed to provide data on the physical and operational characteristics of the Nation's truck population (or sub-population); HPMS is implemented to collect information on the physical and usage characteristics of various highway systems; and state fuel tax reports and IRP are tax-oriented registrations. 16 figs., 13 tabs.

Hu, P.S.; Wright, T.; Miaou, Shaw-Pin; Beal, D.J.; Davis, S.C. (Oak Ridge National Lab., TN (USA); Tennessee Univ., Knoxville, TN (USA))

1989-11-01T23:59:59.000Z

249

Property:Project Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Installed Capacity (MW) Installed Capacity (MW) Jump to: navigation, search Property Name Project Installed Capacity (MW) Property Type String Pages using the property "Project Installed Capacity (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 0 + MHK Projects/ADM 5 + 1 + MHK Projects/AWS II + 1 + MHK Projects/Admirality Inlet Tidal Energy Project + 22 + MHK Projects/Agucadoura + 2 + MHK Projects/Alaska 18 + 10 + MHK Projects/Alaska 36 + 10 + MHK Projects/Algiers Cutoff Project + 16 + MHK Projects/Algiers Light Project + 0 + MHK Projects/Anconia Point Project + 0 + MHK Projects/Ashley Point Project + 0 + MHK Projects/Astoria Tidal Energy + 300 + MHK Projects/Avondale Bend Project + 0 + MHK Projects/Bar Field Bend + 0 +

250

Final Independent External Peer Review Report for the Savannah Harbor Expansion Project  

E-Print Network [OSTI]

for the Savannah Harbor Expansion Project General Reevaluation Report EXECUTIVE SUMMARY Savannah Harbor is a deep and 600 feet wide from deep water in the ocean (River Mile 11.4B) to the channel between the jettiesFinal Independent External Peer Review Report for the Savannah Harbor Expansion Project General

US Army Corps of Engineers

251

The FAST Copper Project: Fundamental Research in Fiber/DSL Broadband Access  

E-Print Network [OSTI]

1 The FAST Copper Project: Fundamental Research in Fiber/DSL Broadband Access Yung Yi, Dahai Xu Abstract This is an overview of the ongoing FAST Copper project, which aims at at substantial improvements in rate, reach, reliability, and quality in copper-last-mile broadband access through fiber/DSL deployment

Yi, Yung

252

large-point | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Dioxide Capture from Large Point Sources Project No.: FG02-04ER83925 SBIR Commercial hollow fiber membrane cartridge. Commercial hollow fiber membrane cartridge 6"(D) X...

253

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Broader source: Energy.gov (indexed) [DOE]

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

254

SETTLEMENT POINTS (Congo, Democra  

E-Print Network [OSTI]

SETTLEMENT POINTS ! ! ! ! ! ! ! ! ! ! ! ! ! ( ( ( ( ( ( ( ( ( ( ( ( ( ! ! ( (Congo, Democra Rwanda Republic of Tanzania Democratic Republic of Congo Settlement Points Administrative Units National

Columbia University

255

Thailand gas project now operational  

SciTech Connect (OSTI)

Now operational, Phase 1 of Thailand's first major natural gas system comprises one of the world's longest (264 miles) offshore gas lines. Built for the Petroleum Authority of Thailand (PTT), this system delivers gas from the Erawan field in the Gulf of Thailand to two electrical power plants near Bangkok, operated by the Electricity Generating Authority of Thailand (EGAT). The project required laying about 360 miles of pipeline, 34-in., 0.625 in.-thick API-5LX-60 pipe offshore and 28-in., 0.406 in.-thick API-5LX-60 onshore. The offshore pipe received a coal-tar coating, a 3.5-5.0 in. concrete coating, and zinc sacrificial-anode bracelets. The onshore line was coated with the same coal-tar enamel and, where necessary, with concrete up to 4.5 in. thick. Because EGAT's two power plants are the system's only customers, no more pipeline will be constructed until deliveries, currently averaging about 100 million CF/day, reach the 250 million CF/day level. The project's second phase will include additional pipelines as well as an onshore distribution network to industrial customers.

Horner, C.

1982-08-01T23:59:59.000Z

256

DOE Hydrogen and Fuel Cells Program Record 5038: Hydrogen Cost Competitive on a Cents per Mile Basis - 2006  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Date: May 22, 2006 8 Date: May 22, 2006 Title: Hydrogen Cost Competitive on a Cents per Mile Basis - 2006 Originator: Patrick Davis & Steve Chalk Approved by: JoAnn Milliken Approval Date: May 22, 2006 Item : Lower the cost of hydrogen from natural gas to be competitive on a cents per mile basis with conventional gasoline vehicles. Supporting Information: The results of a 2003 economic analysis were used to estimate the cost of hydrogen produced from distributed natural gas reforming at $5 per gallon of gasoline equivalent (gge) (See U.S. DOE Record 5030: Hydrogen Baseline Cost of $5 per gge in 2003; available at http://www.hydrogen.energy.gov/program_records). Since the original analysis, DOE-sponsored R&D has resulted in significant cost reductions,

257

Searchlight Wind Energy Project FEIS Appendix A  

Broader source: Energy.gov (indexed) [DOE]

3: Public Hearing Materials 3: Public Hearing Materials Draft Environmental Impact Statement Public Meetings February 21 - 23, 2012 * An approximately 200 megawatt wind energy facility and associated infrastructure proposed by Searchlight Wind Energy, LLC * Project will produce electricity to power approximately 50,000 homes. * An interconnection switching station proposed by Western Area Power Administration 2 3 The proposed project area is adjacent to Searchlight, approximately 60 miles southeast of Las Vegas in Clark County, Nevada Right-of-way application area (shown in red) is the same as the area of mineral segregation at approximately 18,000 acres If approved, the permanent

258

Methodology for Estimating ton-Miles of Goods Movements for U.S. Freight Mulitimodal Network System  

SciTech Connect (OSTI)

Ton-miles is a commonly used measure of freight transportation output. Estimation of ton-miles in the U.S. transportation system requires freight flow data at disaggregated level (either by link flow, path flows or origin-destination flows between small geographic areas). However, the sheer magnitude of the freight data system as well as industrial confidentiality concerns in Census survey, limit the freight data which is made available to the public. Through the years, the Center for Transportation Analysis (CTA) of the Oak Ridge National Laboratory (ORNL) has been working in the development of comprehensive national and regional freight databases and network flow models. One of the main products of this effort is the Freight Analysis Framework (FAF), a public database released by the ORNL. FAF provides to the general public a multidimensional matrix of freight flows (weight and dollar value) on the U.S. transportation system between states, major metropolitan areas, and remainder of states. Recently, the CTA research team has developed a methodology to estimate ton-miles by mode of transportation between the 2007 FAF regions. This paper describes the data disaggregation methodology. The method relies on the estimation of disaggregation factors that are related to measures of production, attractiveness and average shipments distances by mode service. Production and attractiveness of counties are captured by the total employment payroll. Likely mileages for shipments between counties are calculated by using a geographic database, i.e. the CTA multimodal network system. Results of validation experiments demonstrate the validity of the method. Moreover, 2007 FAF ton-miles estimates are consistent with the major freight data programs for rail and water movements.

Oliveira Neto, Francisco Moraes [ORNL] [ORNL; Chin, Shih-Miao [ORNL] [ORNL; Hwang, Ho-Ling [ORNL] [ORNL

2013-01-01T23:59:59.000Z

259

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA - 128 - Olympia-Satsop #3 [Mile1-6]  

Broader source: Energy.gov (indexed) [DOE]

6, 2003 6, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 128 - Olympia-Satsop #3 [Mile 1-6] James Jellison Natural Resource Specialist - TFO/Olympia Proposed Action: Vegetation Management for the Olympia-Satsop #3 230 kV transmission line corridor (reference line) from structure 1/1 through structure 6/1 and between structures 8/3 and 8/4. Other lines which are present in the proposed corridor are the Paul-Satsop #1 500 kV, Olympia-Satsop #2 500 kV, Olympia-South Elma #1 115 kV, Olympia-Kitsap #3 230 kV, Olympia-Shelton #3 230 kV, Olympia-Shelton #4 230 kV, and Olympia-Shelton #1 115 kV. Right of way width averages 615 feet. Location: The project location is within Thurston County, Washington and is within the

260

Active NEPA Projects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Active NEPA Projects Active NEPA Projects Active NEPA Projects List of Active NEPA Projects EIS-0497: CE FLNG Project, Plaquemines Parish, Louisiana The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal in Plaquemines Parish, Louisiana, and approximately 37 miles of 42-inch diameter natural gas transmission pipeline to connect the terminal to natural gas infrastructure facilities. Last Update: January 8, 2014 EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Milton-Freewater, Oregon, and Dayton, Washington Bonneville Power Administration (BPA) is preparing an EIS to analyze the potential environmental impacts of funding a proposal by the Confederated

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

End Points Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Management End Points Management The policy of the EM is that a formal project management approach be used for the planning, managing, and conducting of its projects. Specifying and achieving end points is a systematic, engineering way of proceeding from an existing condition to a stated desired final set of conditions in which the facility is safe and can be economically monitored and maintained. An end point method is a way to translate broad mission statements to explicit goals that are readily understood by engineers and craft personnel who do the work. (It should be recognized that while end points as addressed here are for a final set of conditions for deactivation, they may represent an interim point for the overall EM cleanup goal.) End Points Management

262

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Topic Group Summary Topic Group Summary Presented to: Transportation External Coordination Working Group Presented by: Presented by: Dan King, Oneida Nation, Tribal Topic Group Member Dan King, Oneida Nation, Tribal Topic Group Member April 5, 2005, Spring 2005 April 5, 2005, Spring 2005 Phoenix, AZ Phoenix, AZ 2 Funding Issues - Considerations * Examination of overlapping jurisdictions * Reconsider half-mile limit * Include all public safety officials in training * Ongoing training - turnover of personnel * Recovery of money spent responding to accidents * Cultural resources cannot be replaced - used to sustain communities 3 Funding Issues - Recommendations * Lessons Learned from Department of Homeland Security * Provide direct funding to Tribes * Create simple application process * Appoint Tribal representatives on application

263

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

264

Microsoft PowerPoint - 01 Bosco PM Workshop BOSCO Feb22_2010PB...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications Project Management Update - Paul Bosco, Director, Office of Acquisition & Project Mgt Microsoft PowerPoint - 07 Raines 2010 PMWS-Final BBB Slide 1...

265

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Computational Sciences Oak Ridge Leadership Computing Facility James Hack, Director Buddy Bland, OLCF Project Director Kathlyn Boudwin, Deputy Project Director...

266

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Development Division Hurtis Hodges, Director Construction Management Gerald Palau Project Management Jack Stellern Design Warren Thomas Project Planning and Analysis Gerald Scott...

267

Project311  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lang Lang Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4881 david.lang@netl.doe.gov John Bowser Principal Investigator Compact Membrane Systems, Inc. 325 Water Street Wilmington, DE 19804 302-999-7996 john.bowser@compactmembrane.com Sequestration CARBON DIOXIDE CAPTURE FROM LARGE POINT SOURCES Background Capture of carbon dioxide at the source of its emission has been a major focus in greenhouse gas emission control. Current technologies used for capturing CO 2 suffer from inefficient mass transfer and economics. In Phase I, Compact Membrane Systems, Inc. will fabricate and test a membrane-based absorption system for the removal of carbon dioxide from a simulated power-plant flue gas. The stability of the membrane system under various operating conditions

268

The Shadow on American Democracy I just did an interview with CNN (Miles O'Brien) re "censoring science". The point I  

E-Print Network [OSTI]

, they are attempting to turn them into Offices of Propaganda, masters of double-speak ("clean coal", "clear skies

Hansen, James E.

269

Material Point Methods  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Material Point Methods and Multiphysics for Fracture and Multiphase Problems Joseph Teran, UCLA and Alice Koniges, LBL Contact: jteran@math.ucla.edu Material point methods (MPM)...

271

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £1.1M Funding Source: Departmental Construction Project Programme: Start on Site: November 2010 End Date : March 2011 Occupation Date: March 2011 For further information contact Project Manager as listed above

272

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5 operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20.imperial.ac.uk/biomedeng Construction Project Team: Project Facts & Figures: Budget: £13,095,963 Funding Source: SRIF II and Capital

273

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

274

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

275

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

276

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

277

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Development of Detailed End Points - Development of Detailed End Points - End Point Document Examples Example 28 7.0 ENDPOINTS Chapter 7.0 describes the endpoint development principles and methodology, administration, closure, and turnover package for the 324 and 327 Buildings Stabilization/Deactivation Project. 7.1 Background The endpoint method for the 324 and 327 Buildings Stabilization/Deactivation Project will follow the EM-60 guidance, published in DOE/EM-0318, Rev. 0, U.S. Department of Energy, Office of Environmental Management Facility Deactivation, Methods and Practice Handbook, Emphasizing End Points (sic) Implementation . The methods of defining endpoints for facility stabilization and deactivation were proven extremely effective at the PUREX and B-Plant facilities for planning work and interacting with the

278

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Company Smart Grid Project Baltimore Gas Company Smart Grid Project Baltimore Gas and Electric Company Smart Grid Project Baltimore Maryland Black Hills Power Inc Smart Grid Project Black Hills Power Inc Smart Grid Project Rapid City South Dakota North Dakota Minnesota Black Hills Colorado Electric Utility Co Smart Grid Project Black Hills Colorado Electric Utility Co Smart Grid Project Pueblo Colorado CenterPoint Energy Smart Grid Project CenterPoint Energy Smart Grid Project Houston Texas Central Maine Power Company Smart Grid Project Central Maine Power Company Smart Grid Project Augusta Maine Cheyenne Light Fuel and Power Company Smart Grid Project Cheyenne Light Fuel and Power Company Smart Grid Project Cheyenne Wyoming City of Fulton Missouri Smart Grid Project City of Fulton Missouri

279

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Atlantic City Electric Company Smart Grid Project Mays Landing New Jersey Maryland District of Columbia Avista Utilities Smart Grid Project Avista Utilities Smart Grid Project Spokane Washington Idaho Baltimore Gas and Electric Company Smart Grid Project Baltimore Gas and Electric Company Smart Grid Project Baltimore Maryland Black Hills Power Inc Smart Grid Project Black Hills Power Inc Smart Grid Project Rapid City South Dakota North Dakota Minnesota Black Hills Colorado Electric Utility Co Smart Grid Project Black Hills Colorado Electric Utility Co Smart Grid Project Pueblo Colorado Burbank Water and Power Smart Grid Project Burbank Water and Power Smart Grid Project Burbank California CenterPoint Energy Smart Grid Project CenterPoint Energy Smart Grid

280

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

of DOE's of DOE's National Recycling Policies Impacts on Portsmouth of Potential Changes to DOE Policies EM SSAB NATIONAL CHAIRS MEETING Deer Creek State Park, Mt. Sterling, Ohio November 5-7, 2013 Jeremy Harley, PE Subject Matter Expert, Portsmouth Gaseous Diffusion Plant EM SSAB NATIONAL CHAIRS MEETING Deer Creek State Park, Mt. Sterling, Ohio November 5-7, 2013 Potential for reuse? Towers Process Motors Transformers Switchgear Cable 1,740 motors 10,000 tons 190 miles 2,000 tons Mixed steel, copper, aluminum 50,000 tons 5,000+ tons Transformers 8,000 tons Potential For Recycle? EM SSAB NATIONAL CHAIRS MEETING Deer Creek State Park, Mt. Sterling, Ohio November 5-7, 2013 Structural Steel 225,000 tons Potential For Recycle? EM SSAB NATIONAL CHAIRS MEETING

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

ISO New England Comments on the ISO New England Comments on the National Electric Transmission Congestion Study Department of Energy Workshop Philadelphia, PA December 6, 2011 Michael I. Henderson Director Regional Planning and Coordination, System Planning DOE Workshop - December 6, 2011 © 2011 ISO New England Inc. Key Facts About New England's Electric Power System and Wholesale Electricity Markets 2 6.5 million households and businesses; population 14 million Over 300 generators totaling 32,000 MW of capacity Over 8,000 miles of transmission lines 13 interconnections to electricity systems in New York and Canada 2,035 MW of demand-resources All-time peak demand of 28,130 MW, set on August 2, 2006 More than 450 participants in the marketplace (those who generate, buy, sell, transport, and use wholesale

282

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

283

Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].  

SciTech Connect (OSTI)

The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

Asotin County Conservation District

2008-12-10T23:59:59.000Z

284

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

285

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

286

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

287

An Econometric Analysis of the Elasticity of Vehicle Travel with Respect to Fuel Cost per Mile Using RTEC Survey Data  

SciTech Connect (OSTI)

This paper presents the results of econometric estimation of the ''rebound effect'' for household vehicle travel in the United States based on a comprehensive analysis of survey data collected by the U.S. Energy Information Administration (EIA) at approximately three-year intervals over a 15-year period. The rebound effect is defined as the percent change in vehicle travel for a percent change in fuel economy. It summarizes the tendency to ''take back'' potential energy savings due to fuel economy improvements in the form of increased vehicle travel. Separate vehicles use models were estimated for one-, two-, three-, four-, and five-vehicle households. The results are consistent with the consensus of recently published estimates based on national or state-level data, which show a long-run rebound effect of about +0.2 (a ten percent increase in fuel economy, all else equal, would produce roughly a two percent increase in vehicle travel and an eight percent reduction in fuel use). The hypothesis that vehicle travel responds equally to changes in fuel cost-per-mile whether caused by changes in fuel economy or fuel price per gallon could not be rejected. Recognizing the interdependency in survey data among miles of travel, fuel economy and price paid for fuel for a particular vehicle turns out to be crucial to obtaining meaningful results.

Greene, D.L.; Kahn, J.; Gibson, R.

1999-03-01T23:59:59.000Z

288

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

289

EA-1970: Fishermens Energy LLC Offshore Wind Demonstration Project, offshore Atlantic City, New Jersey  

Broader source: Energy.gov [DOE]

DOE is proposing to provide funding to Fishermens Energy LLC to construct and operate up to five 5.0 MW wind turbine generators, for an offshore wind demonstration project, approximately 2.8 nautical miles off the coast of Atlantic City, NJ. The proposed action includes a cable crossing from the turbines to an on-shore existing substation.

290

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

291

Property:Project Nearest Body of Water | Open Energy Information  

Open Energy Info (EERE)

Nearest Body of Water Nearest Body of Water Jump to: navigation, search Property Name Project Nearest Body of Water Property Type String Pages using the property "Project Nearest Body of Water" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + North Atlantic Ocean + MHK Projects/ADM 3 + Galway Bay site close to Spiddal + MHK Projects/ADM 5 + government Pilot Zone + MHK Projects/Algiers Light Project + Mississippi River + MHK Projects/Anconia Point Project + Mississippi River + MHK Projects/Ashley Point Project + Mississippi River + MHK Projects/Astoria Tidal Energy + East River + MHK Projects/Avalon Tidal + Ingram Thorofare + MHK Projects/Avondale Bend Project + Mississippi River + MHK Projects/BW2 Tidal + Maurice River +

292

End Points Specification Methods | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

End Points Specification Methods End Points Specification Methods End Points Specification Methods Two methods to develop end point specifications are presented. These have evolved from use in the field for deactivation projects. The hierarchical method is systematic, comprehensive, and completely defensible as to the basis for each specification. This method may appear complex to the uninitiated, but it is a straightforward application of a systematic engineering approach. It is labor intensive only during the final stage. This method is appropriate to the type of project involving a complex facility that contains process systems and a variety of contaminated areas or other hazards. The checklist method is an approach that is more appropriate to facilities which require less detailed planning, such as for industrial

293

Caribbean LNG project marks progress; LNG tanker launched  

SciTech Connect (OSTI)

World LNG trade continues to expand as construction of a major LNG project in the Caribbean hits full stride this fall and another LNG carrier was launched earlier this year. Engineering is nearly complete and construction is nearing midway on Trinidad`s Atlantic LNG. In Japan, NKK Corp. launched another LNG tanker that employs the membrane-storage system. The 50-mile pipeline to move natural gas to the Atlantic LNG facility is also on track for completion by October 1998.

NONE

1997-10-20T23:59:59.000Z

294

Microsoft PowerPoint - News Flash_FINAL_073009_vvb  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

July 30, 2009 July 30, 2009 Moab Steps Up the Pace of Mill Tailings Shipments U.S. Department of Energy For more information on EM Recovery Act, visit: www.em.doe.gov/emrecovery Recovery Act funds ($108 million) are being used to accelerate the frequency of uranium mill tailings shipments from the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project site to a disposal site near Crescent Junction, Utah. Mill tailings are a byproduct of uranium mining and processing. Located northwest of Moab in Grand County, Utah, and on the west bank of the Colorado River, the Moab UMTRA Project includes the former Atlas uranium mill site that ceased operations in 1984. About 130 acres of the site is covered by a 16-million-ton uranium mill tailings pile. The mill tailings are being moved by train to the disposal site 30 miles away,

295

Newberry EGS Demonstration Project Environmental Analysis (EA)  

Broader source: Energy.gov (indexed) [DOE]

Newberry Volcano Enhanced Geothermal System (EGS) Demonstration Project UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT (BLM) DOI-BLM-OR-P000-2011-0003-EA DOE/EA-1897 ENVIRONMENTAL ASSESSMENT DECEMBER 2011 Location: Federal Geothermal Leases on the West Flank of Newberry Volcano, Deschutes County, 22 miles south of Bend, Oregon Applicant: Davenport Newberry Holdings LLC and AltaRock Energy, Inc. 225 NW Franklin Avenue, Suite 1 Bend, OR 97701 Tel: 541-323-1190 Lead Agency: U.S. Department of the Interior,

296

Tribal Energy Project Development Process  

Broader source: Energy.gov [DOE]

The DOE Office of Indian Energy has developed the following five-step project development and financing process that focuses on key decision points and outlines a chronological path to smart...

297

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Projects Characterization of Most Promising Carbon Capture and Sequestration Formations in the Central Rocky Mountain Region (RMCCS) RCSP Annual Review Meeting October 5-7, 2010 Pittsburgh, PA Acknowledgements I * Many thanks to the U.S. Department of Energy and NETL for supporting this project * We express our gratitude also to our many industry partners, who have committed a great deal of time, funding and other general support for this project * The work presented today is co-authored by many partners in the RMCCS project * Project Team (Who) * Major Goals (Why) * Work Plan (How) * Progress to Date (What) Presentation Outline Partners The project team consists of the geological surveys in each state of the region, some invaluable industry partners, and of course NETL.

298

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

299

Dulles Corridor Metrorail Project Extension to Wiehle Avenue  

E-Print Network [OSTI]

Airports Authority (MWAA) on February 4, 2010 to conduct a monthly progress meeting for work performed in January 2010 and attended various project meetings on the afternoon of February 4, 2010. As of February 15, Hill is providing a full-time, on-site PMOC presence at the Dulles Corridor project office. The anticipated schedule of PMOC monthly progress meetings is that they will occur during the last week of each month. 1. Project Description MWAA, in cooperation with the Washington Metropolitan Area Transit Authority (WMATA), proposes to implement a 23.1-mile rapid transit system in the Dulles Corridor of Northern Virginia. The proposed corridor follows the alignment of the Dulles International Airport Access Highway (DIAAH) and the Dulles Toll Road within Fairfax County, and the Dulles Greenway, a private toll road in Loudoun County. The Project (Initial Operating Segment) undertakes the construction of the initial 11.7-miles of the rail project from the existing Metrorail Orange Line just east of the West Falls Church (WFC) Station to a station to be constructed at Wiehle Avenue with a total project cost of $3.142 billion. Included in the Project are five new stations (Tysons East, Tysons Central 123, Tysons Central 7, Tysons West and Wiehle Avenue),

unknown authors

2010-01-01T23:59:59.000Z

300

A study of post-thermal recovery of the macroinvertebrate community of Four Mile Creek, June 1985--September 1987. [Savannah River Plant  

SciTech Connect (OSTI)

Four Mile Creek is one of several streams at the Savannah River Site which has received thermal effluents ({le}70{degrees}C water) from nuclear production operations. From 1955--mid-1985, Four Mile Creek received thermal effluent from C-Reactor as well as non-thermal discharges from F and H Separation Areas. Total discharges from all of these facilities was about ten times higher than the natural flow of the creek (Firth et al. 1986). All water being discharged into Four Mile Creek was originally pumped from the Savannah River. This study reports the results of the artificial substrate sampling of macroinvertebrate communities of Four Mile Creek from June 1985 through September 1987, when sampling was terminated. Macroinvertebrate taxa richness, densities, and biomass data from this study are compared to Four Mile data collected prior to the shutdown of C-Reactor (Kondratieff and Kondratieff 1985 and Firth et al. 1986), and to comparable macroinvertebrate data from other Savannah River Site streams. 29 refs., 11 figs., 4 tabs.

Lauritsen, D.; Starkel, W.; Specht, W.

1989-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOEs Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

302

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Webbers Falls Major Rehab Webbers Falls Major Rehab Webbers Falls Major Rehab BUILDING STRONG ® 6/8/2010 2 Plant Cross Section Plant Cross Section BUILDING STRONG ® Project Cost and Scope Project Cost and Scope *Current Cost: $72.7M *Current Completion Date: Jun 2012 *Rehab 2 Bridge Cranes *Rehab 2 Gantry Cranes *Rewind 3 Generators *Install New 13.8KV Breakers and Buss *Repair Misc Mechanical & Electrical Items BUILDING STRONG ® Project Funding Project Funding *Project was 100% funded through customer funding until FY09 ARRA funds were received. ARRA funds now being used for, gantry cranes, breakers, cables and distribution panels. *To date customer funds in the amount of $67.9M have been provided for this project. BUILDING STRONG ® Total Cost Breakdown Total Cost Breakdown

303

Energy-Saving Projects in My Community | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy-Saving Projects in My Community Energy-Saving Projects in My Community Energy-Saving Projects in My Community August 23, 2011 - 4:04pm Addthis Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs Working in the communications office at the Department of Energy, I'm always researching, writing, and talking about our latest initiatives. Topics run the gamut-from student-led solar competitions to engineering breakthroughs in electric vehicle design. I've learned that there are so many interesting projects underway in the clean energy space. Still, writing about an innovative, clean energy project in a state 1,000 miles away is one thing-discovering such a project in your own neighborhood is quite another. That's exactly what happened a couple of weeks ago when I walked into my

304

Transporting TMI-2 (Three Mile Island Unit 2) core debris to INEL: Public safety and public response  

SciTech Connect (OSTI)

This paper describes the approach taken by the US Department of Energy (DOE) to ensure that public safety is maintained during transport of core debris from the Unit-2 reactor at the Three Mile Island Nuclear Power Station near Harrisburg, PA, to the Idaho National Engineering Laboratory near Idaho Falls, ID. It provides up-to-date information about public response to the transport action and discusses DOE's position on several institutional issues. The authors advise that planners of future transport operations be prepared for a multitude of comments from all levels of federal, state, and local governments, special interest groups, and private citizens. They also advise planners to keep meticulous records concerning all informational transactions.

Schmitt, R.C.; Reno, H.W.; Young, W.R.; Hamric, J.P.

1987-01-01T23:59:59.000Z

305

In-depth survey report: control technology assessment of enzyme fermentation processes at Miles Laboratories, Inc. , Elkhart, Indiana  

SciTech Connect (OSTI)

The controls and containment capabilities of the carbohydrase enzyme manufacturing process were evaluated at the Miles Laboratories, Inc. facility located in Elkhart, Indiana. The enzyme alpha-amylase has been produced at this facility since March of 1982. One specific unit process showed results significantly above the background levels, that being the centrifuge. At the vacuum-filter knife edge, the viable levels were higher than background, but even within a few feet of the vacuum-filter belt they were reduced below background levels. Levels were not significantly above background at the fermentor agitator shaft, seed fermentor agitator shaft, and fermentor sample port. The clean room had background levels significantly below the levels in the laboratory. Apparently the overall effective containment of the production organisms used is very good. Measures of total dust levels indicated these were far below the threshold limit value of 10mg/cu m.

Sheehy, J.W.; Martinez, K.F.

1986-10-01T23:59:59.000Z

306

Disposal demonstration of a high integrity container (HIC) containing an EPICOR-II prefilter from Three Mile Island  

SciTech Connect (OSTI)

A high integrity container (HIC) was developed, tested, and certified for use in disposing of unusual low-level radioactive waste from Three Mile Island Unit 2 (TMI-2). The work was coordinated by EG and G Idaho, Inc. and funded by the US Department of Energy. A disposal demonstration using an HIC containing an EPICOR-II prefilter from TMI-2 was completed at the commercial disposal facility in the State of Washington. A Certification of Compliance was issued by the Department of Social and Health Services of the State of Washington to use the HIC in disposing of up to 50 EPICOR-II prefilters. That Certification of Compliance was issued after rigorous review of the HIC design and test program by the State and by the US Nuclear Regulatory Commission. This report describes the processes of loading, transporting, and disposing of the demonstration HIC and briefly describes the design, testing, and approval effort leading up to the demonstration.

McConnell, J.W. Jr.; Tyacke, M.J.; Schmitt, R.C.; Reno, H.W.

1985-02-01T23:59:59.000Z

307

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

308

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rod Shank- SWT Project Manager Rod Shank- SWT Project Manager Joe Lapeyre- HDC Product Coordinator 12 June 2013 SWPA Engineering Analysis Program Turbine Replacement and Generator Rewind BUILDING STRONG ® * Total Analysis Budget for 5 plants- $2,358,000 * Bull Shoals- $455,000 * Norfork- $504,000 * Table Rock- $504,000 * Keystone- $391,000 * Kerr- $504,000 Turbine And Generator Engineering Analysis Budget Cost Summary BUILDING STRONG ® Each plant analysis will include- * Turbine And Generator Condition Assessment * Turbine Performance Testing as needed * Generator Uprate Limit Analysis * Development of Feasible Replacement Alternatives * Economic Analysis of Alternatives * Development of Project Budget Costs * Project Priority Ranking

309

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project - Objectives Assure continued tank integrity * Maintain 28 Double-Shell Tanks to safely store and transfer 53 Million gallons of highly radioactive chemical waste...

310

PowerPoint Presentation  

Energy Savers [EERE]

ECMs including lighting, water, and HVAC controls. Includes basic levels of measurement and verification (M&V) for each ECM. 8 9 Project Funding Tools Comparison ESPC...

311

PowerPoint Presentation  

U.S. Energy Information Administration (EIA) Indexed Site

William Gausman William Gausman Sr. Vice President Asset Management & Planning DOE Energy Information Administration Washington, DC April 7, 2010 PHI's Smart Grid Vision and Investment Grant Awards 1 Presentation Overview * PHI Company overview * PHI's Smart Grid Vision * SGIG Awards - Scope, Costs, Benefits and Schedules * Distribution Automation * Key Next Steps 2 Combined Service Territory Transmission & Distribution Competitive Energy / Other Who is Pepco Holdings, Inc. PHI Investments 2 Regulated transmission and distribution is PHI's core business. 3 Business Overview Gas Customers ►778,000 ►498,000 ►123,000 ►547,000 GWh ►26,549 ►12,494 ► N/A ►9,659 Mcf (000's) ► N/A ► N/A ►19,044 ► N/A Service Area ►640 ►5,000 ►275 ►2,700 (square miles)

312

ARM - Point Reyes News  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Experiment Planning MASRAD Proposal Abstract and Related Campaigns Outreach Posters Climate Research at Point Reyes National Seashore (horizontal) Climate Research at...

313

Contemporary Trends power point  

E-Print Network [OSTI]

Power point slides guiding presentation on closing the gap between political acceptability and administrative sustainability as a prerequisite for effective governance. Leadership challenges are described

Nalbandian, John

2013-02-01T23:59:59.000Z

314

Science Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

315

Projection Systems  

Science Journals Connector (OSTI)

As a general rule, broad-band sources which employ projection optics are the most difficult to evaluate. In addition to the problems encountered in evaluating exposed lamps, one must characterize the projected...

David Sliney; Myron Wolbarsht

1980-01-01T23:59:59.000Z

316

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Combined Pressure and Temperature Contrast and Combined Pressure and Temperature Contrast and Surface-enhanced Separation of Carbon-dioxide for Post-combustion Carbon Capture Dr. Michael S. Wong Professor in Chemical and Biomolecular Engineering, Chemistry and Environmental Engineering Rice University NETL CO 2 Capture Technology Meeting July 10 th , 2013 DOE Project # DE0007531 Project Manager: Ms. Elaine Everitt Outline * About Rice University * Project Overview * Project Team * Combined Pressure and Temperature Contrast and Surface- enhanced Separation of Carbon-dioxide * Selection of materials * Integrated absorber and stripper - A proof-of-concept demonstration * Substrate functionalization * Project Budget 2 * Located in Houston, TX * 295-acre, heavily wooded campus * Ranked 17 th in the US and in the

317

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Associated with Questions Associated with Free Flow Axial Turbines Jim Gibson Devine Tarbell & Associates, Inc. October 27, 2005 2 Roosevelt Island Tidal Energy Project * Verdant Power's RITE Project * Proceeding Through Stage II Licensing Activities * Permits Required (obtained) to Perform Studies * New York State Section 401 / Excavation and Fill * Department of State Coastal Consistency Review * New York SEQR and Federal NEPA Reviews * Army Corps Section 404 and Section 10 Permits * Four Public Notices (for temporary pilot project) * Numerous Agency and Stakeholder Meetings 3 Project Location 4 Project Location 5 6 7 "Six-Pack" Under Water 8 Comments Received From * New York State Department of Environmental Conservation * US Fish and Wildlife Service * NOAA Fisheries (NMFS) * US Coast Guard

318

Hydropower Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

319

Microsoft Word - EchoPointCommunityWind_CX_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

James Hall James Hall Project Manager - TPC-TPP-4 Proposed Action: Integration of the Echo Point Community Wind Generation Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 - Electronic equipment Location: Umatilla County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Echo Point Community Wind's (Echo Point's) small generator interconnection request, BPA proposes to integrate Echo Point's 10-megawatt wind generation project into its balancing authority (BA). The proposed point of interconnection is the Buttercreek Substation owned by the Umatilla Electric Cooperative (UEC). In order to integrate the proposed generation, BPA will install bi-directional generation metering at the Echo Point generation site.

320

Tazimina hydroelectric project, Iliamna, Alaska. Final technical and construction cost report  

SciTech Connect (OSTI)

The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is on the Tazimina River about 12 miles northeast of Iliamna Lake. The taximina River flows west from the Aleutian Range. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

NONE

1998-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Overview o floating point  

E-Print Network [OSTI]

condition codes and branches are same as for single-precision o absolute value and negation can Co-processor o Integer, BCD, and floating point representations o floating point have sign instructions) or even popped twice (FCOMPP) o tests set condition codes: - C0: less or unordered

Biagioni, Edoardo S.

322

Point-Based Graphics  

Science Journals Connector (OSTI)

The polygon-mesh approach to 3D modeling was a huge advance, but today its limitations are clear. Longer render times for increasingly complex images effectively cap image complexity, or else stretch budgets and schedules to the breaking point. Point-based ... Keywords: Computer Graphics, Computers

Markus Gross; Hanspeter Pfister

2007-06-01T23:59:59.000Z

323

Microsoft Word - CX-Harbour_Pointe_130621  

Broader source: Energy.gov (indexed) [DOE]

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Toni L. Timberman Project Manager - TSE-TPP-2 Proposed Action: Harbour Pointe Small Generator Integration Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Location: Mukilteo, Snohomish County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to integrate UniEnergy Technologies' (UET) 1.5-megawatt battery generation project into BPA's balancing authority (BA) in response to a UET small generator interconnection request. The proposed point of interconnection is at Snohomish Public Utility District's (SnoPUD) Harbour Pointe Substation. In order to integrate

324

EIS-0506: Crooked River Valley Rehabilitation Project, Idaho County, Idaho  

Broader source: Energy.gov [DOE]

The U.S. Forest Service, with DOEs Bonneville Power Administration (BPA) as a cooperating agency, is preparing an EIS that evaluates the potential environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat complexity, and improving water quality along approximately 2 miles of the Crooked River. BPAs proposed action is to fund the project. Additional information is available at http://www.fs.fed.us/nepa/fs-usda-pop.php/?project=40648.

325

Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect an additional 1.3 miles of stream and 298.3 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Improving fish passage in Bear Creek to restore tributary and mainstem access; (4) Planting and seeding 6.7 stream miles with 7,100 plants and 365 lbs. of seed; (5) Establishing 18 new photopoints and retaking 229 existing photopoint pictures; (6) Monitoring stream temperatures at 12 locations on 6 streams; (7) completing riparian fence, water gap and other maintenance on 98.7 miles of project fences. Since initiation of the project in 1984 over 62 miles of anadromous fish bearing streams and 1,910 acres of habitat have been protected, enhanced and maintained.

McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

2001-04-01T23:59:59.000Z

326

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

327

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Prioritizing and Managing Risk Prioritizing and Managing Risk across the Organization Cindy Caldwell, Senior Technical Advisor Pacific Northwest National Laboratory Russ Haffner Pacific Northwest Site Office SEPTEMBER 20, 2012 Pacific Northwest National Laboratory A Non-Profit Science and Technology Enterprise 2 4,900 staff members 2000 research users annually $1.1B business volume 600 acres / 101 Buildings Broad portfolio of research Basic unit of research is the project 2000 projects/year Line Management Support Programs Key Stakeholders Project Management Senior Laboratory Management Corporate Risk Management Framework Identify Risk Analyze/Evaluate Risk Treat Risk Monitor and Review Establish the Risk Context Risk Management Process (Adapted from ISO 31000)

328

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Dan Delurey Association for Demand Response & Smart Grid (ADS) National Association of Regulatory Utility Commissioners, ER&E Committee Meeting, July 24, 2012 Portland, OR Program Design & Implementation Working Group Your Logo Here ADS - NAP Project * Design & Implementation includes marketing and marketing communications * Major emphasis on "Lessons Learned" and content that might allow practitioners to determine best practices for them * Project Resources - DOE Funds - ADS Staff - ADS Member in-kind - Non-ADS in-kind www.demandresponsesmartgrid.org 2 ADS - NAP Project * Phase I - Deliverables: * Interviews with Program/Product Managers available via podcast and transcript

329

Point-contact spectroscopy  

Science Journals Connector (OSTI)

Micro-contacts between metals at low temperatures reveal non-linear structures in the current-voltage characteristics. These deviations from Ohm's law allow an energy-resolved spectroscopy of the interaction of the conduction electrons with elementary excitations (e.g. phonons) in a metal. To explain the method, the important parameters (electron mean free path versus contact dimension) in point-contact spectroscopy will be discussed together with examples of spectroscopic information obtained in various systems. Local temperature gradients in the contact region offer the possibility to study thermo-electric phenomena in small constrictions, such as thermal voltages in non-homogeneous contacts and quenching of the phonon-drag term in the thermo-power in homogeneous contacts. Besides these aspects of the point-contact technique, recent experiments will be shown with applications of point contacts other than just spectroscopy: magneto-resistance of a point contact, high-frequency rectification with a point contact as the non-linear element, electron focusing using a double point-contact set-up, electrical noise in constrictions and generation of phonons by means of point contacts.

A M Duif; A G M Jansen; P Wyder

1989-01-01T23:59:59.000Z

330

EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

88: Cameron Pipeline Expansion Project and Cameron LNG 88: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA SUMMARY Federal Energy Regulatory Commission (FERC) is preparing an EIS, with DOE as a cooperating agency, to analyze the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. PUBLIC COMMENT OPPORTUNITIES Comment Period Ends: 03/03/14 DOCUMENTS AVAILABLE FOR DOWNLOAD January 10, 2014

331

EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation  

Broader source: Energy.gov (indexed) [DOE]

933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation 933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA SUMMARY DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington.

332

EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction  

Broader source: Energy.gov (indexed) [DOE]

8: Cameron Pipeline Expansion Project and Cameron LNG 8: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA SUMMARY Federal Energy Regulatory Commission (FERC) is preparing an EIS, with DOE as a cooperating agency, to analyze the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 13, 2012 EIS-0488: Notice of Intent to Prepare an Environmental Impact Statement

333

ARPA-E Technology Showcase: Project Spotlight | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Technology Showcase: Project Spotlight Technology Showcase: Project Spotlight ARPA-E Technology Showcase: Project Spotlight March 1, 2011 - 1:49pm Addthis William Mouat explains the PolyPlus battery technology. | Energy Department photo, credit Ken Shipp. William Mouat explains the PolyPlus battery technology. | Energy Department photo, credit Ken Shipp. April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs Last night, we had the chance to visit with a few of the researchers and scientists behind the exciting projects on display at the 2011 ARPA-E Energy Innovation Summit Technology Showcase. The following projects represent a few of the highlights we found: PolyPlus At Berkeley, CA-based PolyPlus Battery Company, researchers are developing a lithium-air battery that could enable an electric car to travel 500 miles

334

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Broader source: Energy.gov (indexed) [DOE]

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

335

Microsoft Word - cleanup projects at Idaho.doc  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy Office of Inspector General Office of Audit Operations Audit Report Major Clean-Up Projects at the Idaho National Engineering and Environmental Laboratory DOE/IG-0649 May 2004 well after its scheduled July 1, 2003, completion date - in fact, it is currently estimated to be sometime in 2005 or 2006. The Department also did not meet its original completion goal for the Three Mile Island Project and later reduced the scope of the project to compensate for schedule slippages. Although events outside of the Department's control contributed to these schedule delays, enhancements to contract and project management practices could improve the way the Department and its contractors react to these events and ultimately the projects' outcomes.

336

EIS-0393: Montanore Project, Montana | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

93: Montanore Project, Montana 93: Montanore Project, Montana EIS-0393: Montanore Project, Montana Summary This EIS, prepared by the U. S. Department of Agriculture (Kootenai National Forest) and the Montana Department of Environmental Quality, evaluates the environmental impacts of a proposal to build a copper and silver underground mine in a location about 18 miles south of Libby, Montana. DOE's Bonneville Power Administration, a cooperating agency, has jurisdiction over the construction of a transmission line and two substations needed for powering the mine facilities if the proposed action is implemented. Kootenai National Forest's Montanore Project website: http://www.fs.fed.us/nepa/fs-usda-pop.php/?project=11743 Public Comment Opportunities No public comment opportunities available at this time.

337

Moab Project Continues Progress on Tailings Removal with Contract  

Broader source: Energy.gov (indexed) [DOE]

Moab Project Continues Progress on Tailings Removal with Contract Moab Project Continues Progress on Tailings Removal with Contract Transition Moab Project Continues Progress on Tailings Removal with Contract Transition December 27, 2012 - 12:00pm Addthis Laborers place a disposable liner in a tailings container. Laborers place a disposable liner in a tailings container. MOAB, Utah - The Moab mill tailings removal project in Utah ended the year having shipped more than 35 percent of the total 16 million tons of uranium mill tailings off-site. The tailings are being transported by rail 30 miles north to a disposal cell for permanent storage. More than 1 million tons of tailings were shipped during fiscal year 2012, which closed at the end of September. The Moab Project also successfully transitioned both of its prime contracts

338

Moab Project Continues Progress on Tailings Removal with Contract  

Broader source: Energy.gov (indexed) [DOE]

Moab Project Continues Progress on Tailings Removal with Contract Moab Project Continues Progress on Tailings Removal with Contract Transition Moab Project Continues Progress on Tailings Removal with Contract Transition December 27, 2012 - 12:00pm Addthis Laborers place a disposable liner in a tailings container. Laborers place a disposable liner in a tailings container. MOAB, Utah - The Moab mill tailings removal project in Utah ended the year having shipped more than 35 percent of the total 16 million tons of uranium mill tailings off-site. The tailings are being transported by rail 30 miles north to a disposal cell for permanent storage. More than 1 million tons of tailings were shipped during fiscal year 2012, which closed at the end of September. The Moab Project also successfully transitioned both of its prime contracts

339

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H. [Oregon Department of Fish and Wildlife] [Oregon Department of Fish and Wildlife

2009-07-01T23:59:59.000Z

340

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

DOE Small Business Webinar: DOE Small Business Webinar: Getting Involved with ESPCs June 20, 2013 Kurmit Rockwell ESPC Project Manager DOE FEMP 2  FEMP Mission Statement  ESPC Review - What are They?  DOE ESPC IDIQ Overview  ESPC ENABLE Overview  Small Business Opportunities  Questions Agenda 3 Mission FEMP works with Federal leaders to accomplish energy change within organizations by bringing expertise from all levels of project and policy implementation to enable Federal Agencies to meet energy related goals and to provide energy leadership to the country. 4 Contracts that allow agencies to do energy projects with minimal up-front capital cost and no special appropriations from Congress. * Arranges project financing * Guarantees cost savings sufficient to cover

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

US Army Corps of Engineers US Army Corps of Engineers BUILDING STRONG ® ® Dan Brueggenjohann - Project Manager Programs & Project Management Division Tulsa District 14 June 2011 Webbers Falls and Ozark Powerhouse Major Rehabilitation Briefing for 2011 Southwestern Federal Hydropower Conference BUILDING STRONG ® 2 McClellan-Kerr Navigation Project Webbers Falls BUILDING STRONG ® * Run of River Plants * Webbers - 69 MW from three inclined axis units (23 MW each) which were placed in service in 1973. Average annual energy production is 213,000 Megawatt-hours. * Ozark - 115 MW from five inclined axis units (23 MW each) which were placed in service in 1974. Average annual energy production is 429,000 Megawatt -hours. Background BUILDING STRONG ® * Project Scope: Rehabilitation of the Webbers

342

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dan Brueggenjohann - SWT Project Manager Dan Brueggenjohann - SWT Project Manager Byron Floyd - Resident Engineer 12 June 2013 Ozark and Webbers Falls Powerhouse Major Rehabilitation BUILDING STRONG ® * Project Scope: Rehabilitation of the Ozark Powerhouse to include replacement of five turbines, rehabilitation of all cranes, rehab of water Treatment, and misc aux systems * Project Cost including management expenses: $125.7M ($32.9M Customer Funded) * Turbine Contract Notice to Proceed : July 2005 * Awarded Turbine Contract Amount: $74.5M * Current Turbine Contract Amount: $99.0M * Current Required Completion Date : April 20, 2014 * Anticipated Completion Date: March 24, 2017 Ozark Scope, Cost and Schedule BUILDING STRONG ® Ozark Funding Status Ozark/Webbers Falls Major Rehab

343

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1, 2013 (NEW PROJECT) Planned end date: September 30, 2014 Key Milestones 1. 200g Dark Red Pigment, End Q1 2. Additional Pigments Identified, End Q2 3. 500g of 2 New Pigments,...

344

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Product flow historical choices Stock % of lumen-hour sales year Projected growth in LED sales, all sectors 48% Source: Energy Savings Forecast of Solid-State Lighting in...

345

ChargePoint America  

Broader source: Energy.gov (indexed) [DOE]

Energy Award DE-EE0003391 37M Project (15M DoE) * 10 Metro Areas * Approximately 4,600 stations Public and Private Level 2: SAE-J1772 * Two Phases o Deployment phase ends 0630...

346

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Working Session Working Session Presented to: Transportation External Coordination Rail Topic Group Transportation External Coordination Rail Topic Group Presented by: Presented by: Chair, Jay Jones Office of National Transportation March 15 2006 March 15 2006 Washington, DC Washington, DC 2 Agenda * Welcome and Introduction * Roll Call * Status/Update on Rail Topic Group at large * Update/Discussion from Individual Subgroups * Summary of CSG/Midwest Routing Project * Update of CSG/NE Routing Project * TRAGIS Update * Wrap Up * Subgroup Breakout

347

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

348

WORD PROBLEMS 1. Suppose your car gets 25 miles per gallon of gasoline and the price of gas is $3.50 per gallon. Write  

E-Print Network [OSTI]

WORD PROBLEMS 1. Suppose your car gets 25 miles per gallon of gasoline and the price of gas is $3.50 per gallon. Write your monthly gasoline cost C in terms of the distance D that you travel each month

Koban, Nic

349

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 1 (Edinburg) - Curry Main - Final  

E-Print Network [OSTI]

American Development Bank. The proposed project involves installing 1 mile of 72" pipeline to replace a segment of the Curry Main canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

350

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District 72" and 54" Pipeline Replacing Main Canal Preliminary  

E-Print Network [OSTI]

) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the Main Canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

351

On the last mile : the effects of telecommunications regulation and deregulation in the rural western United States and Canada  

E-Print Network [OSTI]

DeCastro, Catherine. Telecommunications Project Continues:and Corporate Control in Telecommunications. In The Newthe Battle over Competition in Telecommunications. Pacific

Kozak, Nadine Irne

2010-01-01T23:59:59.000Z

352

Natural Gas Wells Near Project Rulison  

Office of Legacy Management (LM)

for for Natural Gas Wells Near Project Rulison Second Quarter 2013 U.S. Department of Energy Office of Legacy Management Grand Junction, Colorado Date Sampled: April 3, 2013 Background: Project Rulison was the second underground nuclear test under the Plowshare Program to stimulate natural-gas recovery from deep, low-permeability formations. On September 10, 1969, a 40-kiloton-yield nuclear device was detonated 8,426 feet (1.6 miles) below the ground surface in the Williams Fork Formation, at what is now the Rulison, Colorado, Site. Following the detonation, a series of production tests were conducted. Afterward, the site was shut down and then remediated, and the emplacement well (R-E) and the reentry well (R-Ex) were plugged. Purpose: As part of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) mission

353

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

354

Final environmental impact statement, Washington Water Power/B.C. Hydro Transmission Interconnection Project  

SciTech Connect (OSTI)

Washington Water Power (WWP) proposes to construct and operate an electric transmission line that would connect with the electrical system of the British Columbia Hydro and Power Authority (B.C. Hydro). The project would be composed of a double-circuit, 230-kilovolt (kV) transmission line from WWP`s existing Beacon Substation located northeast of Spokane, Washington to the international border located northwest of Metaline Falls, Washington. The original Presidential permit application and associated proposed route presented in the draft environmental impact statement (DEIS) have been modified to terminate at the Beacon Substation, instead of WWP`s initially proposed termination point at the planned Marshall Substation located southwest of Spokane. A supplemental draft EIS was prepared and submitted for review to not only examine the new proposed 5.6 miles of route, but to also compare the new Proposed Route to the other alternatives previously analyzed in the DEIS. This final EIS (FEIS) assesses the environmental effects of the proposed transmission line through construction, operation, maintenance, and abandonment activities and addresses the impacts associated with the Proposed Action, Eastern Alternative, Western Alternative, Northern Crossover Alternative, Southern Crossover Alternative, and No Action Alternative. The FEIS also contains the comments received and the responses to these comments submitted on the DEIS and Supplemental DEIS.

Not Available

1992-10-01T23:59:59.000Z

355

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

356

The legacy of Three Mile Island -- Implications for today`s U.S. Department of Energy challenges  

SciTech Connect (OSTI)

Over the course of the 16 year period following the accident at Three Mile Island-Unit-2, much has been learned and volumes have been written regarding the cause and massive cleanup activities of the incident. Because of these lessons learned, important changes have been made and the US commercial nuclear industry is safer and more reliable as a result. It is important to recognize that two major sources of information emerged from this event. First and foremost were the important safety issues that required immediate answers and the addition of the modifications to plants that these answers generated. Second and of considerable significance to the US Department of Energy (US DOE) in today`s post-cold war environment are the frequently hard-won lessons involved with the recovery, clean-up, and defueling of TMI-2 and its unprecedented transition into long-term, monitored storage. While the commercial industry, regulatory authorities, and the public saw an immediate need for instituting the important safety lessons from TMI-2, these new systems, improved training and operating practices have paid off in increased reliability and extended operations. However, there was no such immediate application for the second source of information, that being the application of the deactivation and long-term storage technology learned at TMI-2 to a current condition. The tasks and methods used in the TMI-2 recovery have strong parallels in the present-day DOE cleanup program.

Williams, M.S.; Conaway, W.T.; Coe, R.P. [General Public Utilities Nuclear, Parsippany, NJ (United States)

1996-11-01T23:59:59.000Z

357

The legacy of Three Mile Island: Implications for today`s U.S. Department of Energy challenges  

SciTech Connect (OSTI)

Over the course of the 16 year period following the accident at Three Mile Island-Unit-2, much has been learned and volumes have been written regarding the cause and massive cleanup activities of the incident. Because of these Lessons Learned, important changes have been made and the US commercial nuclear industry is safer and more reliable as a result. It is important to recognize that two major sources of information emerged from this event. First and foremost were the important safety issues that required immediate answers and the addition of the modifications to plants that these answers generated. Second and of considerable significance to the US Department of energy (US DOE) in today`s post-cold war environment are the frequently hard-won lessons involved with the recovery, clean-up, and defueling of TMI-2 and its unprecedented transition into long-term, monitored storage. While the commercial industry, regulatory authorities, and the public saw an immediate need for instituting the important safety lessons from TMI-2, these new systems, improved training and operating practices have paid off in increased reliability and extended operations. However, there was no such immediate application for the second source of information, that being the application of the deactivation and long-term storage technology learned at TMI-2 to a current condition. The tasks and methods used in the TMI-2 recovery have strong parallels in the present-day DOE cleanup program.

Coe, R.P.; Conaway, W.T.; Williams, M.S. [General Public Utilities Nuclear, Parsippany, NJ (United States)

1996-12-31T23:59:59.000Z

358

Heat removal aspects of Liquid Metal Fast Breeder Reactor safety in light of the Three Mile Island incident  

SciTech Connect (OSTI)

The safety aspects of the Liquid Metal Fast Breeder Reactor (LMFBR) loop design are compared with those of the Light Water Reactor (LWR), in light of the Three Mile Island (TMI) incident. The events at TMI are briefly described, the fundamental differences between the LWR water coolant and the LMFBR sodium coolant are presented, and the design of analogous LMFBR safety systems under similar events as those at TMI is discussed. A preliminary qualitative evaluation of a TMI-equivalent accident for an LMFBR indicates that there is likely to be: (1) negligible pressure transients in the primary loop, (2) no core damage, (3) isolation of the incident at the steam generator, and (4) no radiation release to the environment, except a negligible amount of tritium from the secondary sodium. Furthermore, with the absence of the ECCS (Emergency Core Cooling System), pressurizer, and other pressure-related components in the LMFBR design, operator action for a LMFBR should be much simpler in dealing with the coolant upset condition and the decay heat removal problems.

Victor, H.R.; Graf, D.G.

1980-12-01T23:59:59.000Z

359

Barge loading facilities in conjunction with wood chipping and sawlog mill, Tennessee River Mile 145. 9R: Environmental assessment  

SciTech Connect (OSTI)

The purpose of this Environmental Assessment (EA) is to evaluate the environmental consequences of approving, denying, or adopting reasonable alternatives to a request for barge loading facilities. These facilities would serve a proposed wood chipping and sawlog products operation at Tennessee River Mile (TRM) 145.9, right descending bank, (Kentucky Lake), in Perry County, Tennessee. The site is located between Short Creek and Peters Landing. The applicant is Southeastern Forest Products, L.P. (SFP), Box 73, Linden, Tennessee and the proposed facilities would be constructed on or adjacent to company owned land. Portions of the barge terminal would be constructed on land over which flood easement rights are held by the United States of America and administered by the Tennessee Valley Authority (TVA). The US Army Corps of Engineers (CE) and TVA have regulatory control over the proposed barge terminal facilities since the action would involve construction in the Tennessee River which is a navigable water of the United States. The wood chipping and sawlog products facilities proposed on the upland property are not regulated by the CE or TVA. On the basis of the analysis which follows, it has been determined that a modified proposal (as described herein) would not significantly affect the quality of the human environment, and does not require the preparation of an environmental impact statement. 8 refs.

Not Available

1990-08-01T23:59:59.000Z

360

Tribal Points of Contacts | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Points of Contacts Points of Contacts Tribal Points of Contacts US DOE-Office of Environmental Management 1000 Independence Avenue, SW Washington, DC 20585 ph: (202) 586-5944 fax: (202) 586-5000 Richland Operations Office- Hanford Indian Nations Program P.O. Box 550- MSIN A7-75 Richland, WA 99352 ph: (509) 376-6332 fax: (509) 376-1563 West Valley Demonstration Project Tribal Government Liaison P.O. Box 191- 10282 Rock Springs Road West Valley, NY 14171 ph: (716) 942-4629 fax: (716) 942-2068 Albuquerque Operations Office Tribal Government Liaison P.O. Box 5400 Albuquerque, NM 87185 ph: (505) 845-5977 fax: (505) 845-4154 Tribal Points of Contact Richland Operations Office: Hanford Albuquerque Operations Office: Yakama Indian Nation Environmental Restoration/ Waste Management Program

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

362

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

363

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

364

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

365

Discontinued Projects  

Broader source: Energy.gov [DOE]

This page lists projects that received a loan or a loan guarantee from DOE, but that are considered discontinued by LPO for one of several reasons.

366

project management  

National Nuclear Security Administration (NNSA)

the Baseline Change Proposal process. Two 400,000-gallon fire protection water supply tanks and associated pumping facilities were added. Later in the project, an additional...

367

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Incentive Payment - The ESIP works with utility, industry, and BPA to complete the measurement and verification, reporting and development of a custom project completion...

368

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Cleanup Project _____________________ September 21, 2005 FRR Rail Shipment to Idaho Presentation to the DOE Transportation External coordination Working Group (TEC) Mark R. Arenaz DOE-ID Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 2 DOE - Idaho Operations Office FRR Rail Shipment * Overview of Shipment * Operational Aspects * Emergency Response Preparation * Institutional Program * Route Determination * Lessons Learned * Pictures Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 3 Overview of Shipment * First shipment of Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) * Spent Fuel originated in So. Korea * Transport by dedicated ship to Naval Weapons Station - Concord (NWSCo) * Transport by dedicated rail from NWSCo to Idaho National Laboratory Site

369

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FWP-FEW0174 - Task 5 Presenter: Megan Smith PI: Susan Carroll Yue Hao U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344 Lawrence Livermore National Laboratory 2 Presentation Outline  Benefit to Program  Project Overview  Technical Status  Accomplishments  Summary  Appendix Lawrence Livermore National Laboratory 3 Benefit to the Program  This research project quantifies relationships between fluid flow, heterogeneity, and reaction rates specific to

370

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Solid Sorbents as a Solid Sorbents as a Retrofit Technology for CO 2 Capture July 8, 2013 ADA-ES, Inc. © 2013 ADA-ES, Inc. All Rights Reserved DE-FE0004343 ©2012 ADA-ES, Inc. All rights reserved. © 2013 ADA-ES, Inc. All Rights Reserved ► The overall objective of this funding stage is to validate solid sorbent-based post combustion CO 2 capture through slipstream pilot testing. ► Project Goals: * Achieve 90% CO 2 Capture * Reduce costs of carbon capture Progress towards <35% LCOE Goal * Generate a high purity CO 2 stream * Successfully scale sorbents CO 2 Project Funding and Goals © 2013 ADA-ES, Inc. All Rights Reserved Cooperative Agreement (Award No. DEFE0004343) American Recovery and Reinvestment Act of 2009 Administered by DOE-NETL: Project Manager Bruce Lani

371

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Putting enzymes to w ork(tm) Putting enzymes to w ork(tm) ADVANCED LOW ENERGY ENZYME-CATALYZED SOLVENT FOR CO 2 CAPTURE John Reardon; Director, Engineering Project: DE-FE0004228 NETL National CO 2 Capture Technology Meeting; Pittsburgh, PA July 9, 2013 2  Company profile and project overview  Technical background & fundamentals  Progress and current status  Summary of results  Future work OUTLINE 2 3 * St. Louis-based biotechnology company  Developing lower cost, environmentally friendly solutions for CO 2 capture for variety of applications * Integrating proprietary biocatalyst delivery with various solvent systems Company profile AKERMIN INC. 3 4 Project awardee, FFRDC, and Subcontract: Enzyme Supply: Test Site: (NCCC) Fabrication:

372

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

in Western Utility Energy Efficiency in Western Utility in Western Utility Energy Efficiency in Western Utility Resource Plans Resource Plans Implications for Regional Assessments and Implications for Regional Assessments and Initiatives Initiatives Charles Goldman Nicole Hopper Lawrence Berkeley National Laboratory CREPC Meeting San Diego, CA September 28, 2006 Overview of Presentation Overview of Presentation * LBNL/CREPC Resource Assessment Project - Overview - Data Sources * Treatment of Energy Efficiency (EE) in Resource Plans - Why does it matter? * Energy Efficiency in Recent Resource Plans: - Common Inconsistencies and Data Problems - Levels of EE Proposed in Recent Utility Resource Plans * Recommendations and tools for tracking and reporting EE in future resource plans to support West-wide goals and analysis LBNL/CREPC Resource Assessment Project LBNL/CREPC Resource Assessment Project

373

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Project Risk Project Risk Management Lessons Learned DOE Risk Management Workshop Harry E. Peters, II, PMP Federal Project Director, Level IV & Chris Murphy Navarro Research and Engineering November 5, 2009 2 Uranium Processing Facility (UPF) * Replaces and consolidates existing enriched uranium manufacturing and processing capabilities into a single modern facility * Improves reliability, security, safety, and operational efficiency * Results in $205 million in life cycle cost savings for Y-12 once operational and protected area can be reduced * Reduces worker internal radiological exposures by 90% * Reduces Y-12's security footprint by 90% 3 Uranium Processing Facility 3 UPF Site Layout Fire water tank & pump 4 UPF HEUMF B e ar C re ek R o a d Cooling Towers Gases Facility Process

374

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LLNL-PRES-642912-DRAFT LLNL-PRES-642912-DRAFT Snøhvit CO 2 Storage Project FWP-FEW0174 Task 4 Laura Chiaramonte, Joshua A. White, Whitney Trainor- Guitton and Yue Hao Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Lawrence Livermore National Laboratory LLNL-PRES-642912-DRAFT  Benefit to Program  Project Goals & Objectives  Technical Status  Summary & Accomplishments  Appendix Outline Lawrence Livermore National Laboratory LLNL-PRES-642912-DRAFT

375

Whistling Ridge Energy Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Whistling Ridge Energy Project Bonneville Power...

376

Microsoft PowerPoint - Forest County Potawatomi Project Greenfire  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Building during the 3rd quarter of 2011 2.0 megawatt anaerobic biodigester and biogas facility located near Potawatomi Bingo Casino in Milwaukee, WI Operates on liquid...

377

Microsoft PowerPoint - Poplawsky_2014_CNMSUserProjectHighlight...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

To achieve high-efficiency polycrystalline CdTe-based thin-film solar cells, the CdTe absorbers must go through a post-deposition CdCl 2 heat treatment (HT) followed by a Cu...

378

Microsoft PowerPoint - Mahjouri-Samani_CNMSUserProject Highlight...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

chalcogenide crystals that should prove useful for their scaled production for optoelectronic and energy applications, is demonstrated. The "digital transfer growth" technique...

379

Cremona special sets of points in products of projective spaces  

E-Print Network [OSTI]

by the Coxeter graph of type Tp,q,r. We will be interested in the cases when the group Wp,q,r is infinite, if q = 2, the group of automorphisms of the blow-up surface becomes iso- morphic to a subgroup

Dolgachev, Igor V.

380

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy Transportation External Working Group (TEC) EDWARDS MOVING & RIGGING, INC. Heavy Transport Presentation Presented By What kind of projects do we do? Heavy Transport Heavy Rigging Focus today is Heavy Transport Focus today is Heavy Transport Turbine Generator Transformer Boilers Vessel Press Bridge Duct work Railroad Engine Tank Relocation 440T Building Solid Masonry Even a building facade "These guys can move anything" Pressurizer RA Movement of Hazardous Cargo Major Plant Components & Casks Cask Movement Shipment by Road Shipment by Road Shipment by Railroad Shipments by Barge What makes Transport Contactors Suited for these projects? Complete Package *Engineering *Planning *State-of-the-art-equipment

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Atlantic Wind Connection Update Atlantic Wind Connection Update Mohamed M. El-Gasseir, Ph.D. Principal Atlantic Grid Development LLC Department of Energy Workshop Applications for HVDC Technologies April 22, 2013 Information for Discussion Purposes Only * Transmission challenges underlying the AWC Project * Project configuration and technology choice * The rationale * Key challenges * Lessons learned 2 Topics * Accessing most premium of offshore wind (OSW) * Locationally constrained resource * Weak interconnection interface * Need to minimize cost of delivered OSW energy * Availability of system benefits 3 Underlying Transmission Challenges 4 * Very high quality wind * Substantial capacity * Shallow sea floor * Proximity to high demand * Geo-electric appeal Accessing A Most

382

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plant Testing of Piperazine Plant Testing of Piperazine (PZ) with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at Austin Katherine Dombrowski (PM), URS Andrew Sexton (TE), Trimeric Bruce Lani, DOE PM 1 Outline * Project overview * Energy Features of the PZ process - A new flash stripper * Solvent management with PZ - Solution analyses from 3 pilot plants * Future work on aerosol formation - A major challenge for volatile amine * PZ, a competitive alternative 2 Project Objectives * Primary: - Quantify robustness of PZ in an integrated system with 150 o C regeneration * Secondary: - Optimize equipment design & energy performance of advanced flash regeneration - Identify & resolve issues with process control, foaming, solids precipitation

383

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy Department of Energy Environmental Management Environmental Management Transportation Transportation Update Update Dennis Ashworth Dennis Ashworth Director, EM Office of Transportation Director, EM Office of Transportation 2 2 Environmental Management Office of Transportation Protecting the Public and the Environment in all aspects of our Transportation Operations Transportation, Logistics and Waste Disposition are Transportation, Logistics and Waste Disposition are Key Contributors to the EM Project Key Contributors to the EM Project Ensuring disposition paths are identified for Ensuring disposition paths are identified for all EM waste and materials all EM waste and materials Providing and coordinating disposition Providing and coordinating disposition

384

Strategic Focus Points  

Broader source: Energy.gov (indexed) [DOE]

Focus Points Focus Points June 2011 1. Establish the human capital and organizational foundation to create a high-performing organization. 2. Implement a cyber risk-management and incident response program that ensures effective security of Federal and M&O networks, provides appropriate flexibility, and meets legal requirements and OMB expectations. 3. Improve IT Services (EITS) into a best-in-class provider from both a technical and business perspective. 4. Implement and institutionalize a reformed, integrated information management governance process that respects the goal to treat M&Os distinctively different than true Federal entities. 5. Transition to 5-year planning and programming, using the NNSA Planning, Programming, Budgeting and Evaluation (PPBE) process as a starting point to include resource and requirements validation.

385

Improving Floating Point Compression  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improving Improving Floating Point Compression through Binary Masks Leonardo A. Bautista Gomez Argonne National Laboratory Franck Cappello Argonne National Laboratory Abstract-Modern scientific technology such as particle accel- erators, telescopes and supercomputers are producing extremely large amounts of data. That scientific data needs to be processed using systems with high computational capabilities such as supercomputers. Given that the scientific data is increasing in size at an exponential rate, storing and accessing the data is becoming expensive in both, time and space. Most of this scientific data is stored using floating point representation. Scientific applications executed in supercomputers spend a large amount of CPU cycles reading and writing floating point values, making data compression techniques an interesting way to increase computing efficiency.

386

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Broader source: Energy.gov (indexed) [DOE]

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

387

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

388

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

389

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

390

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

391

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

392

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

393

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

394

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

395

Category:Smart Grid Investment Grant Projects | Open Energy Information  

Open Energy Info (EERE)

Investment Grant Projects Investment Grant Projects Pages in category "Smart Grid Investment Grant Projects" The following 98 pages are in this category, out of 98 total. A ALLETE Inc., d/b/a Minnesota Power Smart Grid Project American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project Atlantic City Electric Company Smart Grid Project Avista Utilities Smart Grid Project B Baltimore Gas and Electric Company Smart Grid Project Black Hills Power, Inc. Smart Grid Project Black Hills/Colorado Electric Utility Co. Smart Grid Project Burbank Water and Power Smart Grid Project C CenterPoint Energy Smart Grid Project Central Lincoln People's Utility District Smart Grid Project Central Maine Power Company Smart Grid Project Cheyenne Light, Fuel and Power Company Smart Grid Project

396

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

397

World's Largest Solar Energy Project Heads to Mojave | Department of  

Broader source: Energy.gov (indexed) [DOE]

World's Largest Solar Energy Project Heads to Mojave World's Largest Solar Energy Project Heads to Mojave World's Largest Solar Energy Project Heads to Mojave April 16, 2010 - 4:47pm Addthis A California company will harness the Mojave Desert sunshine to create the world's largest solar energy system by the end of 2013. The Ivanpah Solar Electric Generating System, located just a few miles from the California - Nevada border near Interstate 15, will generate approximately 400 MW of energy per year, almost doubling the amount of solar thermal energy produced in the United States. Ivanpah will focus sunlight from mirrors placed on poles, which don't require the land to be graded and can be placed around areas that are already in use or environmentally sensitive. The project of Oakland, Calif.-based BrightSource Energy, Inc. will likely generate enough power

398

Project Aids Development of Legacy Oilfield on Alaska's North Slope |  

Broader source: Energy.gov (indexed) [DOE]

Project Aids Development of Legacy Oilfield on Alaska's North Project Aids Development of Legacy Oilfield on Alaska's North Slope Project Aids Development of Legacy Oilfield on Alaska's North Slope October 18, 2013 - 11:52am Addthis Project Aids Development of Legacy Oilfield on Alaska’s North Slope Quick Facts The National Petroleum Reserve was created by President Warren G, Harding in 1923 when the U.S. Navy was converting from coal to oil. The reserve spans 22 million acres across the western North Slope of Alaska-the largest single unit of public lands in the nation. The 800-mile-long trans-Alaska pipeline carries oil from Prudhoe Bay, on Alaska's North Slope, to Valdez, Alaska, the nearest ice-free port. More than 16 million barrels of oil have traveled through the pipeline since the first barrel flowed in 1977.

399

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

400

EIS-0497: CE FLNG Project, Plaquemines Parish, Louisiana | Department of  

Broader source: Energy.gov (indexed) [DOE]

497: CE FLNG Project, Plaquemines Parish, Louisiana 497: CE FLNG Project, Plaquemines Parish, Louisiana EIS-0497: CE FLNG Project, Plaquemines Parish, Louisiana SUMMARY The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal in Plaquemines Parish, Louisiana, and approximately 37 miles of 42-inch diameter natural gas transmission pipeline to connect the terminal to natural gas infrastructure facilities. The project would include two floating liquefied natural gas (FLNG) vessels that would pretreat, liquefy, store, and offload LNG; a berth for the FLNG vessels; and a berth and turning basin for traditional LNG carriers. PUBLIC COMMENT OPPORTUNITIES

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Aids Development of Legacy Oilfield on Alaska's North Slope |  

Broader source: Energy.gov (indexed) [DOE]

Project Aids Development of Legacy Oilfield on Alaska's North Project Aids Development of Legacy Oilfield on Alaska's North Slope Project Aids Development of Legacy Oilfield on Alaska's North Slope October 18, 2013 - 11:52am Addthis Project Aids Development of Legacy Oilfield on Alaska’s North Slope Quick Facts The National Petroleum Reserve was created by President Warren G, Harding in 1923 when the U.S. Navy was converting from coal to oil. The reserve spans 22 million acres across the western North Slope of Alaska-the largest single unit of public lands in the nation. The 800-mile-long trans-Alaska pipeline carries oil from Prudhoe Bay, on Alaska's North Slope, to Valdez, Alaska, the nearest ice-free port. More than 16 million barrels of oil have traveled through the pipeline since the first barrel flowed in 1977.

402

Libby-Troy Line Rebuild Project - July 25, 2008  

Broader source: Energy.gov (indexed) [DOE]

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

403

EA-1966: Sunflower Wind Project, Hebron, North Dakota | Department of  

Broader source: Energy.gov (indexed) [DOE]

6: Sunflower Wind Project, Hebron, North Dakota 6: Sunflower Wind Project, Hebron, North Dakota EA-1966: Sunflower Wind Project, Hebron, North Dakota SUMMARY Western Area Power Administration (Western) is preparing an EA to evaluate potential environmental impacts of interconnecting a proposed 80 MW generating facility south of Hebron in Morton and Stark Counties, North Dakota. The proposed wind generating facility of 30-50 wind turbines would encompass approximately 9,000 acres. Ancillary facilities would include an underground collection line system, a project substation, one mile of new transmission line, a new switchyard facility on the existing Dickinson-Mandan 230 kV line owned and operated by Western, one permanent meteorological tower, new access roads, and an operations and maintenance building.

404

February 2013 Point Sheets  

E-Print Network [OSTI]

February 2013 MPTs and Point Sheets National Conference of Bar Examiners 302 South Bedford Street)...............................................30 LIBRARY Excerpts from the Indian Child Welfare Act of 1978, 25 U.S.C. §§ 1901 et seq...................33 Department of the Interior, Bureau of Indian Affairs, Guidelines for State Courts; Indian Child Custody

Marsh, David

405

MYSTERY OF POINT CHARGES  

E-Print Network [OSTI]

for more general potentials and dynamical systems are obtained in [9]. ..... with a suitable multiple of Q: this operation does not change common zeros of Q ...... Terao [16] on the number of critical points for the product of powers of real linear .... J.E.Goodman and J. O'Rourke eds.,Handbook of discrete and computational...

2006-06-12T23:59:59.000Z

406

SETTLEMENT POINTS Congo, Democra  

E-Print Network [OSTI]

! ! ! ! ( ( ( ( ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ( ( ( ( ( (( ( ( ( ( ( ( ( ( (!( Botswana Congo, Democra Congo Namibia Zambia GRUMPv1 A t l a n t i c O c e a n ´ 0 250 500 Km Lambert. Available at:http://sedac.ciesin.columbia.edu/gpw/ Democratic Republic of Congo Settlement Points

Columbia University

407

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

408

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

409

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

410

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

411

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

412

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

413

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

414

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

415

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

416

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

417

LUCF Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RZWR'HVLJQDQG RZWR'HVLJQDQG +RZWR'HVLJQDQG ,PSOHPHQW&DUERQ ,PSOHPHQW&DUERQ 0HDVXULQJDQG0RQLWRULQJ 0HDVXULQJDQG0RQLWRULQJ $.WLYLWLHVIRU/8&) $.WLYLWLHVIRU/8&) 3URMH.WV 3URMH.WV Sandra Brown Winrock International sbrown@winrock.org Winrock International 2 3URMH.WGHVLJQLVVXHV 3URMH.WGHVLJQLVVXHV z Baselines and additionality z Leakage z Permanence z Measuring and monitoring z Issues vary with projects in developed versus developing countries Winrock International 3 /HDNDJH /HDNDJH z Leakage is the unanticipated loss or gain in carbon benefits outside of the project's boundary as a result of the project activities-divide into two types: - Primary leakage or activity shifting outside project area - Secondary leakage or market effects due to

418

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

419

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

420

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

422

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

423

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Recalibration Methodology for Transmitters and Recalibration Methodology for Transmitters and Instrumentation Pradeep Ramuhalli Pacific Northwest National Laboratory May 21-22, 2013 2 Project Overview  Goal: Develop and evaluate a standardized framework for next- generation online monitoring applicable to current and future nuclear systems  Participants: PNNL (Pradeep Ramuhalli, Jamie Coble, Guang Lin, Brett Braatz) AMS (Brent Shumaker)  Research directly supports primary goals of LWRS, SMR, ARC, NGNP, and MPACT  Supports secondary goals of AF and UNFD 3 Project Background  Measurement reliability key to safe, economic and secure operation of nuclear systems Interval-based recalibration used to assure reliability  Current practices have several drawbacks Time consuming and expensive

424

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

1613 NTSF 1613 NTSF National Transportation Stakeholder Forum West Valley Demonstration Project A Short History and Status May 7, 2013 www.wv.doe.gov Bryan C. Bower, Director bryan.bower@wv.doe.gov 1 051613 NTSF West Valley Demonstration Project (WVDP) Mission 2 The WVDP mission was defined by an act of Congress in 1980 - Public Law 98-368 1. Solidify the high-level radioactive waste at the Center * 99.7% of the curies in the tanks were vitrified and the glass is contained in 275 stainless steel canisters 2. Develop containers suitable for permanent disposal of the waste 3. Transport the solidified waste to a federal repository for permanent disposal 4. Dispose of low-level radioactive waste (LLW) and transuranic (TRU) waste 5. Decontaminate and decommission the underground

425

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

This presentation was given for the This presentation was given for the Navigant Research Webinar on Fast DC Charging for Electric Vehicles * http://www.navigantresearch.com/webinar/fast-dc-charging-for-electric-vehicles * April 9, 2013 1 Lessons Learned on the EV Project and DC Fast Charging Garrett Beauregard Executive Vice President and General Manager, eTec Labs April 9, 2013 ECOtality Company Overview Leading Hardware, Software and R&D for electric transportation Diversified revenue base of 3 complementary business segments Blink * Residential, public & commercial EV charging solutions * Contracted by U.S. Dept. of Energy for The EV Project (~$115M) * Over 11,000 chargers installed as of April 2013 Minit-Charger * Fast charging electric material handling and ground support equipment

426

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8, 2006 8, 2006 LITTLE ROCK DISTRICT STUDIES AFFECTING FEDERAL HYDROPOWER Hydropower Conference June 8, 2006 US Army Corps US Army Corps of Engineers of Engineers ® ® One Corps Serving The Army and the Nation US Army Corps US Army Corps of Engineers of Engineers ® ® One Corps Serving The Army and the Nation US Army Corps US Army Corps of Engineers of Engineers ® ® One Corps Serving The Army and the Nation Current Studies/Projects Current Studies/Projects * 303(d) Listing - Bull Shoals, Norfork, Dardanelle - Districts Position *Table Rock Auxiliary Spillway * White River Minimum Flows * Arkansas River Navigation * White River Basin Comprehensive Study * Norfork Stilling Basin Aeration * Water Supply Storage Reallocations US Army Corps US Army Corps of Engineers of Engineers ® ® One Corps Serving

427

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

6 Northern Power Systems, Inc 6 Northern Power Systems, Inc Northern Power Systems 182 Mad River Park Waitsfield, VT 05673 Ultracapacitor EnergyBridge(tm) UPS for Palmdale Water District DOE/ESS PEER Review November 3, 2006 11/03/2006 Northern Power Systems, Inc © 2006 2 Northern Power  Distributed Energy Systems Corp (NASDAQ:DESC)  Energy Solutions since 1974  Products, Systems and Services Divisions  Hundreds of Projects around the World  HQ and Manufacturing in Vermont  Regional offices in NY, TX, CA, England, and Mexico 11/03/2006 Northern Power Systems, Inc © 2006 3 Project Overview  CEC - California Energy Commission  Funding agency  Palmdale Water District  Award recipient, host site  Northern Power  Technology provider  Black & Veatch  Owner's engineer

428

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Bus Bus NaS Battery Energy Storage Project U.S. DOE Peer Review Seattle, WA October 8, 2009 Steve Eckroad Electric Power Research Institute Seckroad@epri.com (704) 595-2717 2 © 2009 Electric Power Research Institute, Inc. All rights reserved. Acknowledgements This project is part of the joint energy storage initiative between the New York State Energy Research and Development Agency (NYSERDA) and the Energy Storage Systems Program of the U.S. Department of Energy (DOE/ESS) and managed by Sandia National Laboratories (SNL). Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC84-94AL85000. * US DOE and NYSERDA - Imre Gyuk and Joe Sayer

429

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Utility-Scale Solar 2012 Utility-Scale Solar 2012 An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States Mark Bolinger & Samantha Weaver Lawrence Berkeley National Laboratory September 2013 1 This research was supported by funding from the U.S. Department of Energy's SunShot Initiative. Presentation Outline * Recent market growth has resulted in a critical mass of project-level data ripe for analysis * Key findings from this inaugural edition  Installed Costs/Prices  Operating (O&M) Costs  Performance (Capacity Factors)  Power Purchase Agreement ("PPA") Prices 2 A few background notes about this first edition: * Certain data (e.g., O&M costs) were still rather limited for this first edition, but are

430

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Project 2E Project 2E Mapping Energy Futures: The SuperOPF Planning Tool Bill Schulze, Dick Schuler, Ray Zimmerman, Jubo Yan*, Charles Marquet* (Cornell) Dan Shawhan, Biao Mao*, Zamiyad Dar*, Andy Kindle* (RPI) John Taber (FERC) Network reductions from Dan Tylavsky, Di Shi, Yingying Qi*, Yujia Zhu* (ASU) * Graduate Student PSERC Existing Planning Tools * Are very detailed but do not optimize investment over the planning region, or * Are highly aggregated using bubbles and pipes (or only a small number of nodes) to represent the network, and * None include environmental modeling of ambient pollution * Few or none include joint variation of load, wind, and solar, by location PSERC SuperOPF Planning Tool Uses three network reductions (for the EI, ERCOT and WECC) from Dan

431

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

from IGCC Gas Streams from IGCC Gas Streams Using the AC-ABC Process 2013 NETL CO 2 Capture Technology Meeting July 8-11, 2013 Pittsburgh, PA. SRI- Who We Are A world-leading independent R&D organization 2 * Founded by the Stanford University in 1946 - Non-profit corporation; became independent in 1970 - Name changed to SRI International in 1977 * 2,500 staff members; more than 20 locations worldwide * 2012 revenues: ~$545 million. CO 2 Capture Programs at SRI Advanced Carbon Sorbent Process Field Demonstration at U. Toledo 250 kW Chilled Ammonia Process Mini-pilot System 50 kW High Temperature PBI Membrane Skid. Pilot Unit for Capture of CO2 from Air Project Overview * Project Participants: - SRI International. - Bechtel Hydrocarbon Treatment Solutions, Inc. - EIG, Inc. - National Carbon Capture Center

432

Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico  

Broader source: Energy.gov (indexed) [DOE]

47 47 Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico November 3, 2003 Department of Energy National Nuclear Security Administration Los Alamos Site Office Environmental Assessment for the Proposed DX Division Strategic Facility Plan at LANL DOE LASO November 3, 2003 iii Contents Acronyms and Terms................................................................................................................................vii Executive Summary ...................................................................................................................................xi 1.0 Purpose and Need

433

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coupling Between Oceanic Upwelling and Cloud Coupling Between Oceanic Upwelling and Cloud Coupling Between Oceanic Upwelling and Cloud - - Aerosol Properties Aerosol Properties at the AMF Point Reyes Site at the AMF Point Reyes Site Maureen Dunn , Mike Jensen , Pavlos Kollias , Mark Miller , Peter Daum Mary Jane Bartholomew , David Turner , Elisabeth Andrews and Anne Jefferson Introduction Ground based observations from the MASRAD, Pt. Reyes AMF July 1-Sept 15, 2005 indicate a relationship between coastal marine stratus cloud properties, boundary layer cloud condensation nuclei and the upwelling of cool oceanic waters measured at an offshore NOAA buoy. Cloud Drizzle to CCN Atmosphere to Cloud Upwelling SST to Atmosphere Conclusion Coastal marine stratus clouds increase in thickness as the underlying sea surface

434

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Commercialization of the SuperOPF Commercialization of the SuperOPF Framework: Phase III (Theme: Co- optimization Stochastic SuperOPF- renewables) Performers: PSERC: Hsiao-Dong Chiang - LEAD Cornell University: Ray Zimmerman Bigwood Systems, Inc.: Patrick Causgrove, Bin Wang Phase I: 1.(support industrial model) A commercial-grade core SuperOPF software supporting various industrial-grade power system models such as (i) CIM-compliance; and (ii) PSS/E data format 2. A multi-stage OPF solver with adaptive homotopy-based Interior Point Method for large- scale power systems (PJM: 14,000-bus data) Bigwood Systems Inc., 2013 3 Results: Efficiency and Robustness (Analytical Jacobian matrices) Loading Conditions One-Staged Interior Point Method Multi-Staged Scheme 1 Succeeded Succeeded

435

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

436

DOE - Office of Legacy Management -- Project Gas Buggy Site - NM 14  

Office of Legacy Management (LM)

Gas Buggy Site - NM 14 Gas Buggy Site - NM 14 FUSRAP Considered Sites Site: Project Gas Buggy Site (NM.14 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gasbuggy, New Mexico, Site Nevada Test Site History Documents Related to Project Gas Buggy Site Fact Sheet Gasbuggy, New Mexico The Gasbuggy Site is located in northwestern New Mexico in Rio Arriba County approximately 55 miles east of the city of Farmington and approximately 12 miles southwest of Dulce, New Mexico, in the Carson National Forest. Floodplains and Wetlands Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico, December 1993.

437

Preparing for Project Implementation Financing Project Implementation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Project Implementation Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

438

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H.

2008-12-30T23:59:59.000Z

439

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capture and sequestration: capture and sequestration: Technology options for new and retrofit applications 2 nd U.S.-China CO 2 Emissions Control Science & Technology Symposium Organized by Zhejiang University and Columbia University 29-30 May 2008 - Hangzhou, People's Republic of China Richard D. Doctor, Chemical Engineer, P.E. Section Leader, Energy Systems Division Argonne National Laboratory 9700 S. Cass Ave. Argonne, IL USA 60439-4815 rdoctor@anl.gov 2 Project Sponsor U.S. Department of Energy Office of Fossil Energy www.fe.doe.gov 3 Supporting the United Nations IPCC -Special Report‖ on Carbon Dioxide Capture and Storage

440

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Financing Essentials Financing Essentials Oklahoma Tribal Leader Forum Oklahoma City, Oklahoma August 13, 2012 About DOE Office of Indian Energy Goals and objectives: * Promote Indian tribal energy development, efficiency, and use * Reduce or stabilize energy costs * Enhance and strengthen Indian tribal energy and economic infrastructure relating to natural resource development and electrification * Bring electrical power and service to Indian land and the homes of tribal members Energy Policy Act of 2005, Title V, Sec. 502 2 Why Complete a Renewable Energy Project? Income Jobs Experience Cost savings Cost stabilization Tax revenue Industry exposure Energy reliability Self reliance Environmental sustainability Benefits vary based on the type and scale of

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IOGCC/SSEB PTTF REPORT IOGCC/SSEB PTTF REPORT THE PIPELINE PROJECT: Analysis of potential pipeline infrastructure, transportation & storage of CO 2 Presented at DOE's Carbon Storage Program Infrastructure Annual Review Meeting Nov. 15, 2011 Acknowledgement * This material is based upon work supported by the U.S. Department of Energy's National Energy Technology Laboratory. The Report Four sections: 1. Overview 2. Background 3. Analysis 4. Recommendations PART 1: OVERVIEW * Pipeline Transportation Task Force * Collaborative Work Group Model * Task Force Objectives IOGCC-SSEB CO 2 Pipeline Transportation Task Force (PTTF) * Offshoot of IOGCC's Carbon Capture and Geologic Storage Task Force * Southeast Regional Carbon Sequestration Partnership Focus Area * Collaboration: Task Force Composition

442

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

STAR Grant Research STAR Grant Research on Carbon Geosequestration Barbara Klieforth National Center for Environmental Research Office of Research and Development US Environmental Protection Agency U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 NCER's Extramural Programs * Science To Achieve Results (STAR) - Targeted Research Grants through RFAs - Competed Centers * Fellowship Programs - STAR Graduate - Greater Research Opportunities (GRO) Undergraduate * Small Business Innovation Research (SBIR) Contracts Supporting the New ORD Structure * Unprecedented timescale & scope imposes novel

443

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Conard Stair Conard Stair Enforcement Program Manager B&W Y-12 March 2012 Enforcement Coordination Working Group Spring 2012 Meeting Y-12 Approach to Enforcement Y-12 Enforcement Program Office (EPO) * Integrated program with a single point of contact for enforcement activities for radiological protection, worker safety and health, and classified information security * Proceduralized and automated process that provides consistent documentation of compliance determinations and reporting * Uses a decentralized approach with Line Management Price- Anderson Officers (LMPOs) assisted by a cadre of subject matter experts to perform screening determinations * Provides policy, direction, guidance, and independent oversight * Serves as chief technical advisor to senior leadership team on

444

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

445

Project Homepage  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Middle School Home Energy Audit Middle School Home Energy Audit Project Homepage NTEP Home - Project Homepage - Teacher Homepage - Student Pages Abstract: This set of lessons provides an opportunity for midlevel students to gain a basic understanding of how energy is turned into power, how power is measured using a meter, the costs of those units and the eventual reduction of energy consumption and cost to the consumer. Introduction to Research: By conducting energy audits of their own homes and completing exercises to gain baclground information, students begin to see the importance of energy in their daily lives. By using the Internet as a research tool, students gain develop research skills as they gain knowledge for their project. They use e-mail to collaborate with energy experts and share results with other

446

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

447

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

448

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

449

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

450

Research projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Yuan » Research projects Yuan » Research projects Research projects Research Interests Scientific computing, domain decomposition methods Linear solvers for sparse matrices Computational plasma physics Grid generation techniques GPU computing Current Research PDSLin: A hybrid linear solver for large-scale highly-indefinite linear systems The Parallel Domain decomposition Schur complement based Linear solver (PDSLin), which implements a hybrid (direct and iterative) linear solver based on a non-overlapping domain decomposition technique called chur complement method, and it has two levels of parallelism: a) to solve independent subdomains in parallel and b) to apply multiple processors per subdomain. In such a framework, load imbalance and excessive communication lead to the performance bottlenecks, and several techniques are developed

451

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

452

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

453

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

454

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

455

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

456

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

457

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

458

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

459

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

460

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

462

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

463

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

464

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

465

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

466

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

467

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

468

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

Project Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity, supervisory control and data acquisition (SCADA) systems require a method to validate device-to- device communication and verify that information has come from a trusted source and not been altered in transit. The Secure SCADA Communications Protocol (SSCP) provides message

469

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

470

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

471

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

472

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PETROLEUM MAGNETICS INTERNATIONAL PETROLEUM MAGNETICS INTERNATIONAL NOVEMBER 28, 1996 FC9520 / 95PT8 ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS PETROLEUM MAGNETIC INTERNATIONAL DOWNHOLE MAGNETS FOR SCALE CONTROL Prepared for: Industry Publication Prepared by: MICHAEL R. TYLER RMOTC Field Engineer November 28, 1995 650100/9520:jb ABSTRACT November 28, 1995 The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a field test on the Petroleum Magnetics International (PMI) downhole magnet, at the Naval Petroleum Reserve No. 3 (NPR- 3) located 35 miles north of Casper in Natrona County, Wyoming. PMI of Odessa, Texas, states that the magnets are designed to reduce scale and paraffin buildup on the rods, tubing

473

Header with Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission 42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission Hydrogen/Syngas Combustion 12/15/2006 FACT SHEET I. PROJECT PARTICIPANTS Parker Hannifin Corporation (Lead) Gas Turbine Fuel Systems Division, 9200 Tyler Blvd., Mentor OH 44060 PI: Dr. Adel Mansour (e-mail: amansour@parker.com, Ph.: 440-954-8171) University of California at Irvine UCI Combustion Laboratory, Irvine, CA 92617 Solar Turbines Incorporated 2200 Pacific Highway, San Diego CA 92101 II. PROJECT DESCRIPTION A. Objective(s) The overall objective of this DOE-Supported research and development program is to develop and test a next-generation, practical and scalable, high-performing, multi-point injector module for hydrogen and syngas fuels. The injector will use Parker Hannifin's

474

Moisture Metrics Project  

SciTech Connect (OSTI)

the goal of this project was to determine the optimum moisture levels for biomass processing for pellets commercially, by correlating data taken from numerous points in the process, and across several different feedstock materials produced and harvested using a variety of different management practices. This was to be done by correlating energy consumption and material through put rates with the moisture content of incoming biomass ( corn & wheat stubble, native grasses, weeds, & grass straws), and the quality of the final pellet product.This project disseminated the data through a public website, and answering questions form universities across Missouri that are engaged in biomass conversion technologies. Student interns from a local university were employed to help collect data, which enabled them to learn firsthand about biomass processing.

Schuchmann, Mark

2011-08-31T23:59:59.000Z

475

R U S O N PROJECT  

Office of Legacy Management (LM)

R R U S O N PROJECT Austral (X1 Company 25-95 A Hasward u s o n Field Garfield County, Colorado .. 10 3/4" Caaing to 8701 Feet DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. Representatives Present During Operations Austral O i l Company AEC Continental. O i l C - C.E.R. Fenix & Scisson, Inc. Iamb, Inc. Dresser Atlas Representative Miles Reynolds U b e r t Veronie Alvin Toniette Don Dahle C. m m l e y R. Bmdahaw Francis West R. V. Quim D. Mitchell Carl Schwab larrg Meam & Crew R. Smith N. Pomerenke B. McDonald K. Daaldns W. Bains & Crew 28'' OPEN HOLE T O 37' POLYMER XP-20 SPERSENE WIRE LINE MEASUREMENTS WT. - 9.1 USING KELLY BUSHING AS VIS.- 68 ZERO REFERENCE. GROUND

476

Hot Springs-Garrison Fiber Optic Project  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA`s substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA.

Not Available

1994-10-01T23:59:59.000Z

477

Interstate Clean Transportation Corridor Project Under Way  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

rucks that travel in the western rucks that travel in the western United States will soon be able to operate clean-burning alternative fuel vehicles (AFVs) along the Interstate Clean Transpor- tation Corridor (ICTC). The ICTC project is the first effort to develop clean transportation corridors to connect Los Angeles, San Bernar- dino, the San Joaquin Valley, Sacra- mento/San Francisco, Salt Lake City, Reno, and Las Vegas along routes 1-15, 1-80, and 1-5/CA-99. The ICTC team, headed by California- based Gladstein and Associates, plans to have commitments by early 1997 for 10 to 15 fueling sites located approximately 180 miles apart. These sites will serve 250 new heavy-duty AFVs and 500 local delivery vehicles. Their fuels will displace 4.7 million gallons of petroleum and mitigate more than

478

Boundary-Spokane/Colville Valley Support Project : Environmental Assessment.  

SciTech Connect (OSTI)

Systems studies conducted by Bonneville Power Administration indicate a need to reinforce the existing transmission system in the Colville Valley area of Washington. Analysis of several options concluded that the optimal solution for reliability and transmission loss concerns, to serve load growth, and to integrate new power generation projects was to increase transmission voltage capacity between Half Moon Substation and Boundary Substation. The Boundary-Spokane/Colville Valley Support Project is a plan to accomplish this. The project involves rebuilding an existing 91-mile single-circuit 115-kV line between Half Moon Substation and Metaline Falls to double-circuit 230-kV configuration, and adding a single-circuit 230-kV line between Metaline Falls and Boundary Substation, a distance of 9 miles. A route option and a tower design option are being evaluated for selected sections of the proposed route. The proposed action, including route and tower design options, is evaluated in this document. This evaluation includes assessments of the level of environmental impacts and impact ratings, and a comparison of options. In addition, the advantages and disadvantages of the delay/no-action and conservation alternatives are evaluated and compared to the consequences of the proposed action. Alternatives to the proposed action are described. 6 figs., 10 tabs.

United States. Bonneville Power Administration.

1983-06-01T23:59:59.000Z

479

Tribal Renewable Energy Advanced Course: Community Scale Project  

Broader source: Energy.gov (indexed) [DOE]

Community Scale Project Community Scale Project Development Tribal Renewable Energy Advanced Course: Community Scale Project Development Watch the DOE Office of Indian Energy renewable energy course entitled "Tribal Renewable Energy Project Development and Financing: Community Scale" by clicking on the .swf link below. You can also download a PDF of the PowerPoint slides. This course provides in-depth information on community-scale project development process for renewable energy projects on tribal lands, including: Project development and financing concepts for a community-scale project Project development and financing process and decision points for a community-scale project How to pay for a community-scale project. See the full list of DOE Office of Indian Energy educational webinars and

480

SharePoint 2010 Overview  

Science Journals Connector (OSTI)

Hello and welcome to SharePoint 2010. Microsoft SharePoint has journeyed a long way since the early days of 2001 and SharePoint Portal Server 2003. SharePoint administrators and developers jumped for joy in 20...

Robert Garrett

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mile point project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Sundance Energy Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Sundance Energy LLC (Sundance) has applied to the Western Area Power Administration (Western) to interconnect a planned generator facility to Western's transmission system in the vicinity of Coolidge, Arizona. Western's proposed action is to enter into an interconnection and construction agreement with Sundance for the requested interconnection. The proposed interconnection would integrate the power generated by the Sundance Energy Project (Project) into the regional transmission grid and would allow Sundance to supply its power to the competitive electric wholesale market. The proposed Project would be built on private lands southwest of Coolidge. The proposed Project would be a ''peaking power plant project'' which means it would provide energy when it is needed during peak demand periods in the region. The proposed Project would also be a ''merchant plant'' which means it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the energy generated by the power plant. Western, as a major transmission system owner, must generally provide access to its transmission system when requested by an eligible organization per existing policies, regulations and laws. The proposed Project would consist of the construction and operation of a generating facility; construction of a 14-mile pipeline to supply natural gas to the proposed Facility; a new 230-kV bay at an existing substation; a new double-circuit 230-kV transmission line; a new single-circuit 230-kV transmission line; an upgrade of a 115-kV line to 230-kV specifications; and an upgrade of an existing substation. Three alternatives would consist of different locations of the 230-kV transmission lines and would not involve upgrading the 115-kV line or the existing substation. The environmentally preferred alternative is Alternative 3, the power line routing that is furthest west.

N /A

2001-06-29T23:59:59.000Z

482

Innovative Project Helps Refloat a Local Industry | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Helps Refloat a Local Industry Project Helps Refloat a Local Industry Innovative Project Helps Refloat a Local Industry April 4, 2012 - 1:55pm Addthis Check out the first Houseboat to Energy Efficient Residences (HBEER) prototype home located in Monticello, Kentucky. | Courtesy of University of Kentucky. Chris Galm Marketing & Communications Specialist, Office of Energy Efficiency & Renewable Energy In 1952, the U.S. Army Corps of Engineers dammed up the Cumberland River in Eastern Kentucky for the dual purposes of flood control and to generate electricity at a hydroelectric plant. The creation of the 101 mile-long reservoir accomplished both goals, and in the process spawned a new industry -- the construction and maintenance of houseboats. By the mid-1990s, Lake Cumberland had an average of 4.5 million visitors a

483

Western Area Power Administration, Desert Southwest Region Facilities Ratings Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Ratings Project Facilities Ratings Project Hoover-Mead #1 and #5 230-kV and Mead-Marketplace 500-kV Transmission Lines Continuation Sheet Project Description (Continued) Hoover-Mead # 1 230-kV Transmission Line Along the Hoover-Mead #1 230-kV transmission line, the existing line will be reconductored between structures 0/4 and 4/2, about 3.5 linear miles. Structure 0/4 is located northeast of Mead Substation; structure 4/2 is located southeast of Boulder City Tap. The scope of work for the reconductoring includes the following: * At tangent structures (where there is no change in the angle of the transmission line), pulleys or travelers will be installed where the existing conductor attaches to the insulator. The old conductor will be pulled out through the travelers and new wire will be pulled in. A bucket truck

484

EIS-0494: Excelerate Liquefaction Solutions Lavaca Bay LNG Project, Calhoun  

Broader source: Energy.gov (indexed) [DOE]

4: Excelerate Liquefaction Solutions Lavaca Bay LNG Project, 4: Excelerate Liquefaction Solutions Lavaca Bay LNG Project, Calhoun and Jackson Counties, Texas EIS-0494: Excelerate Liquefaction Solutions Lavaca Bay LNG Project, Calhoun and Jackson Counties, Texas SUMMARY The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas terminal consisting of two floating liquefaction, storage and offloading units and a 29-mile pipeline header system to transport natural gas from existing pipeline systems to the LNG terminal facilities. PUBLIC COMMENT OPPORTUNITIES None at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 12, 2013 EIS-0494: Notice of Intent to Prepare an Environmental Impact Statement

485

NETL: News Release - New Projects to Investigate Smart Drilling Options  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

February 20, 2004 February 20, 2004 New Projects to Investigate "Smart Drilling" Options Promise Lower Cost, More Reliable Gas Drilling Two additional projects have been selected under a Department of Energy solicitation designed to advance performance when drilling for natural gas. The projects are a key component of the Department's gas exploration and production research program, and support the President's National Energy Policy, which calls for boosting domestic production of natural gas to ensure an adequate future supply at reasonable prices. With shallow and conventional natural gas resources in the United States being depleted, drillers must reach for gas miles below the earth's surface, where temperatures run up to 450 EF and pressures are hundreds of times greater than atmospheric pressure. "Smart drilling" options can increase productivity, improve drilling safety, and lower costs when drilling for these hard-to-reach deep gas supplies.

486

Innovative Project Helps Refloat a Local Industry | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Innovative Project Helps Refloat a Local Industry Innovative Project Helps Refloat a Local Industry Innovative Project Helps Refloat a Local Industry April 4, 2012 - 1:55pm Addthis Check out the first Houseboat to Energy Efficient Residences (HBEER) prototype home located in Monticello, Kentucky. | Courtesy of University of Kentucky. Chris Galm Marketing & Communications Specialist, Office of Energy Efficiency & Renewable Energy In 1952, the U.S. Army Corps of Engineers dammed up the Cumberland River in Eastern Kentucky for the dual purposes of flood control and to generate electricity at a hydroelectric plant. The creation of the 101 mile-long reservoir accomplished both goals, and in the process spawned a new industry -- the construction and maintenance of houseboats. By the mid-1990s, Lake Cumberland had an average of 4.5 million visitors a

487

EIS-0488: Cameron Liquefaction Project, Cameron Parish, Louisiana |  

Broader source: Energy.gov (indexed) [DOE]

88: Cameron Liquefaction Project, Cameron Parish, Louisiana 88: Cameron Liquefaction Project, Cameron Parish, Louisiana EIS-0488: Cameron Liquefaction Project, Cameron Parish, Louisiana SUMMARY Federal Energy Regulatory Commission (FERC) is preparing an EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest. PUBLIC COMMENT OPPORTUNITIES To comment on the Draft EIS, use one of the following methods and refer to FERC Dockets CP13-25-000 and CP13-27-000. FERC requests to receive comments

488

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

489

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Maine Yankee Reactor Vessel Maine Yankee Reactor Vessel Removal & Barge Transport U.S. Department of Energy TEC Working Group April 4-5, 2005 Phoenix, Arizona Ted Feigenbaum Maine Yankee President & CEO The Maine Yankee Reactor Pressure Vessel Project Ingredients for Success Solid Planning + Flawless Implementation + Extensive Communication = . . . Success The reactor pressure vessel (RPV) internals, before segmentation. 2001 The segmented RPV internals. 2001 The arrival of the RPV shipping container cover at Maine Yankee. May 2001 Vessel lift from Containment for transfer to the shipping container. August 2002 Vessel transfer to the shipping container. August 2002 The empty RPV shipping container and skid in the back yard. 2001 The shipping container, staged in the Containment

490

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Background and Introduction Background and Introduction Acknowledgments This research was supported in part by the Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards under the EERE Fuel Cell Technologies Program administered by the Oak Ridge Institute for Science and Education (ORISE) for the DOE. ORISE is managed by the Oak Ridge Associated Universities (ORAU) under DOE contract number DE-AC05-06OR23100. Modified Physisorption-Based Materials for the Ambient Temperature Storage of Molecular H 2 Impact This project aims to synthesize, characterize and evaluate a new class of materials, namely metal- and cluster-modified ultra-high area diamond network materials. If fully successful, these materials are potentially capable of satisfying, and even exceeding, the U.S. DOE's 2015 excess gravimetric and

491

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

2008 2008 1 Jim Eyer - Distributed Utility Associates, Inc. 17 Electric Utility-Related Electricity Storage Benefits, Featuring T&D Deferral DOE Peer Review September 2008 - Washington D.C. by Distributed Utility Associates, Inc. Jim Eyer, Senior Analyst jim@dua1.com This project is part of the Energy Storage Collaboration between the California Energy Commission (CEC) and the Energy Storage Systems Program of the U.S. Department of Energy (DOE/ESS) and managed by Sandia National Laboratories (SNL). Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration, under contract DE-AC04-94AL85000. Funding: Congressional ear-mark. DOE Peer Review 2008

492

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

National Laboratory Mentor-Protégé Program Business Success Stories Presented by Cassandra McGee Stuart ORNL Small Business Programs Office May 23, 2013 2 Presentation name Today, ORNL is DOE's largest science and energy laboratory 2 Managed by UT-Battelle for the U.S. Department of Energy $1.65B budget World's most intense neutron source 4,400 employees World-class research reactor 3,000 research guests annually $500M modernization investment Nation's largest materials research portfolio Most powerful open scientific computing facility Nation's most diverse energy portfolio Managing billion-dollar U.S. ITER project 3 Managed by UT-Battelle for the U.S. Department of Energy ORNL is managed by UT-Battelle, LLC * A 65-year relationship with DOE

493

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The EMS Energy Institute and and Department of Energy and Mineral Engineering, The EMS Energy Institute and and Department of Energy and Mineral Engineering, The Pennsylvania State University 209 Academic Projects Building, University Park, PA 16802 Xiaoliang Ma*, Xiaoxing Wang, and Chunshan Song* Concept of MBS Acknowledgment  U.S. Department of Energy, NETL through DOE Grant DE- FC26-08NT0004396.  Pennsylvania Energy Development Authority (PEDA) under Grant PG050021.  U.S. Office Naval Research through OND N00014-08-1-0123 A New Generation of "Molecular Basket" Sorbents (MBS) for Separation of CO 2 and H 2 S from Various Gas Streams Wide Applications * Biogas * Landfill Gas * Coal/biomass Gasification Gas * Natural Gas * Reformate * Syngas Gas cleaning up:  Sorption Capacity of MBS 10 µm 1 µm *In comparison with industrial absorbents and state-of-the-art adsorbents

494

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

APPA and Federal Hydropower APPA and Federal Hydropower Will Coffman Senior Government Relations Representative American Public Power Association Atlanta, Georgia Oct. 20, 2013 Overview * APPA, the American Public Power Association (APPA): trade association for the more than 2,000 community-owned, not-for- profit electric utilities providing service to 47 mil Americans in 49 states. Many of our members purchase power from Corps projects - Approx. 1,200 public power systems and rural electric cooperatives in 33 states. * We, along with NRECA, advocate for federal hydro customers in Congress and with the Administration Areas of Advocacy 1. Congress - Provide background on PMA customer issues to Committees of jurisdiction * Senate: Energy and Natural Resources * House: Natural Resources

495

PowerPoint Presentation  

Broader source: Energy.gov (indexed) [DOE]

Radiation-induced Ductility Radiation-induced Ductility Enhancement in Amorphous Fe and Al2O3+TiO2 Nano-structured Coatings under Fast Neutrons Nick Simos, BNL Co-PIs: Dr. Simerjeet Gill, BNL Prof. T. Tsakalakos and Dr. K. Akdogan Nano Structured Materials Group Nano Structured Materials Group Department of Materials Science & Engineering Department of Materials Science & Engineering Rutgers University Webinar - August 20, 2013 Project Description  Explore the protective performance of Fe-based amorphous and ceramic (Al 2 O 3 and Al 2 O 3 +TiO 2 ) nanostructured coatings under extreme temperatures, neutron irradiation and aggressively corrosive environments  Study the effects of fast neutrons  Study resistance to ductility loss of the composite structures (coating + substrate) and

496

PowerPoint Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the US DOE Office of Science, Office of High Energy Physics, by the US DOE Office of Science, Office of High Energy Physics, via the SBIR & SciDAC programs; and also by ASCR, Nuclear Physics & Basic Energy Sciences via the SBIR program; used NERSC supercomputing center. Large Scale Computing and Storage Requirements for High Energy Physics (An HEP/ASCR/NERSC Workshop) Rockville, MD, November 12, 2009 Finite Difference Time Domain (FDTD) Electromagnetic Modeling Efforts of the ComPASS SciDAC (and related SBIR) Projects J.R. Cary, 1,2 K. Amyx, 1 T. Austin, 1 D. Bruhwiler, 1 B. Cowan, 1 P. Messmer, 1 P. Mullowney, 1 K. Paul, 1 P. Stoltz, 1 D. Smithe, 1 S. Veitzer 1 & G. Werner 1,2 1. Tech-X Corp. 2. University of Colorado Motivating Science & Applications * Scientific objectives for the next 3-5 years: rapid high-fidelity simulation &