Powered by Deep Web Technologies
Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Teleseismic-Seismic Monitoring | Open Energy Information  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring Teleseismic-Seismic Monitoring Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Teleseismic-Seismic Monitoring Details Activities (33) Areas (18) Regions (5) NEPA(0) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Seismic Techniques Parent Exploration Technique: Passive Seismic Techniques Information Provided by Technique Lithology: Rock unit density influences elastic wave velocities. Stratigraphic/Structural: Map geothermal reservoir geometry. Structural geology- faults, folds, grabens, horst blocks, sedimentary layering, discontinuities, etc. Hydrological: Combining compressional and shear wave results can indicate the presence of fluid saturation in the formation.

2

Teleseismic-Seismic Monitoring At Geysers Area (Zucca, Et Al...  

Open Energy Info (EERE)

Zucca, Et Al., 1994) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Geysers Area (Zucca, Et Al., 1994)...

3

Teleseismic-Seismic Monitoring At Valles Caldera - Redondo Geothermal...  

Open Energy Info (EERE)

Steck, Et Al., 1998) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Valles Caldera - Redondo Geothermal Area...

4

Teleseismic-Seismic Monitoring At Central Nevada Seismic Zone Region  

Open Energy Info (EERE)

Biasi, Et Al., 2008) Biasi, Et Al., 2008) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Central Nevada Seismic Zone Region (Biasi, Et Al., 2008) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown References Glenn Biasi, Ileana Tibuleac, Leiph Preston (2008) Regional Resource Area Mapping In Nevada Using The Usarray Seismic Network Retrieved from "http://en.openei.org/w/index.php?title=Teleseismic-Seismic_Monitoring_At_Central_Nevada_Seismic_Zone_Region_(Biasi,_Et_Al.,_2008)&oldid=425638" Category: Exploration Activities What links here

5

Teleseismic-Seismic Monitoring At Central Nevada Seismic Zone Region  

Open Energy Info (EERE)

Central Nevada Seismic Zone Region Central Nevada Seismic Zone Region (Biasi, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Central Nevada Seismic Zone Region (Biasi, Et Al., 2009) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin Retrieved from "http://en.openei.org/w/index.php?title=Teleseismic-Seismic_Monitoring_At_Central_Nevada_Seismic_Zone_Region_(Biasi,_Et_Al.,_2009)&oldid=425640"

6

Teleseismic-Seismic Monitoring At Valles Caldera - Sulphur Springs Area  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring At Valles Caldera - Teleseismic-Seismic Monitoring At Valles Caldera - Sulphur Springs Area (Roberts, Et Al., 1995) Exploration Activity Details Location Valles Caldera - Sulphur Springs Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness useful DOE-funding Unknown Notes We have described the experimental details, data analysis and forward modeling for scattered-wave amplitude data recorded during a teleseismic earthquake survey performed in the Valles Caldera in the summer of 1987. Twenty-four high-quality teleseismic events were recorded at numerous sites along a line spanning the ring fracture and at several sites outside of the caldera. References Peter M. Roberts, Keiiti Aki, Michael C. Fehler (1995) A Shallow Attenuating Anomaly Inside The Ring Fracture Of The Valles Caldera, New

7

Definition: Teleseismic-Seismic Monitoring | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Teleseismic-Seismic Monitoring Jump to: navigation, search Dictionary.png Teleseismic-Seismic Monitoring Teleseismic monitoring is a technique to seismically image an area utilizing earthquakes originating from distances greater than 1,000 km from the measurement site.[1] View on Wikipedia Wikipedia Definition A teleseism is the tremor caused by an earthquake that is very far away. According to the USGS, the term, teleseismic refers to earthquakes that occur more than 1000 km from the measurement site. Often teleseismic events can be picked up only by seismometers that are in low background noise locations; whereas, in general, a tremor of a magnitude 5.3 earthquake can be seen anywhere in the world with modern seismic

8

Teleseismic-Seismic Monitoring At Valles Caldera - Redondo Area (Roberts,  

Open Energy Info (EERE)

Et Al., 1995) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Valles Caldera - Redondo Area (Roberts, Et Al., 1995) Exploration Activity Details Location Valles Caldera - Redondo Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness useful DOE-funding Unknown Notes We have described the experimental details, data analysis and forward modeling for scattered-wave amplitude data recorded during a teleseismic earthquake survey performed in the Valles Caldera in the summer of 1987. Twenty-four high-quality teleseismic events were recorded at numerous sites along a line spanning the ring fracture and at several sites outside of the caldera. References Peter M. Roberts, Keiiti Aki, Michael C. Fehler (1995) A Shallow

9

Teleseismic-Seismic Monitoring At Lassen Volcanic National Park Area (Janik  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring At Lassen Volcanic National Park Area (Janik Teleseismic-Seismic Monitoring At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Exploration Activity Details Location Lassen Volcanic National Park Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness useful DOE-funding Unknown References Cathy J. Janik, Marcia K. McLaren (2010) Seismicity And Fluid Geochemistry At Lassen Volcanic National Park, California- Evidence For Two Circulation Cells In The Hydrothermal System Retrieved from "http://en.openei.org/w/index.php?title=Teleseismic-Seismic_Monitoring_At_Lassen_Volcanic_National_Park_Area_(Janik_%26_Mclaren,_2010)&oldid=425654"

10

Teleseismic-Seismic Monitoring At Coso Geothermal Area (1975-1976) | Open  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring At Coso Geothermal Area (1975-1976) Teleseismic-Seismic Monitoring At Coso Geothermal Area (1975-1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (1975-1976) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 1975 - 1976 Usefulness not indicated DOE-funding Unknown Exploration Basis Estimate thermal regime and potential of the system Notes Three-dimensional Q -1 model of the Coso Hot Springs known geothermal resource area was conducted. To complete the model a regional telemetered network of sixteen stations was operated by the U.S. Geological Survey; deployed a portable Centipede array of 26 three-component stations near the

11

Teleseismic-Seismic Monitoring At Coso Geothermal Area (1998-2002) | Open  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring At Coso Geothermal Area (1998-2002) Teleseismic-Seismic Monitoring At Coso Geothermal Area (1998-2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (1998-2002) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 1998 - 2002 Usefulness not indicated DOE-funding Unknown Notes Two recent earthquake sequences near the Coso geothermal field show clear evidence of faulting along conjugate planes. Results from analyzing an earthquake sequence occurring in 1998 are presented and compared with a similar sequence that occurred in 1996. The two sequences followed mainshocks that occurred on 27 November, 1996 and 6 March, 1998. Both mainshocks ruptured approximately colocated regions of the same fault

12

Teleseismic-Seismic Monitoring At Kilauea Southwest Rift And South Flank  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring At Kilauea Southwest Rift And South Flank Teleseismic-Seismic Monitoring At Kilauea Southwest Rift And South Flank Area (Wyss, Et Al., 2001) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Kilauea Southwest Rift And South Flank Area (Wyss, Et Al., 2001) Exploration Activity Details Location Kilauea Southwest Rift And South Flank Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness could be useful with more improvements DOE-funding Unknown Notes In spite of the complications discovered in this b-value analysis of Kilauea's South Flank, there are many similarities with the case histories of the other volcanoes we have studied, and the correlation of high b-value anomalies withmagma reservoirs is confirmed.

13

Teleseismic-Seismic Monitoring At Hawthorne Area (Lazaro, Et Al., 2010) |  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring At Hawthorne Area Teleseismic-Seismic Monitoring At Hawthorne Area (Lazaro, Et Al., 2010) Exploration Activity Details Location Hawthorne Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness not indicated DOE-funding Unknown Notes The Navy GPO has contracted the University of Nevada Reno Great Basin for Center for Geothermal Research to conduct additional field exploration at HAD. The tasks required by the Navy range from field mapping and water sampling; detailed mapping, to low angle sun photo interpretations, trenching, to 3-D seismic interpretations and modeling. References Michael Lazaro, Chris Page, Andy Tiedeman, Andrew Sabin, Steve Bjornstad, Steve Alm, David Meade, Jeff Shoffner, Kevin Mitchell, Bob Crowder, Greg Halsey (2010) United States Department Of The Navy Geothermal

14

Teleseismic-Seismic Monitoring At Coso Geothermal Area (1980) | Open Energy  

Open Energy Info (EERE)

Teleseismic-Seismic Monitoring At Coso Geothermal Teleseismic-Seismic Monitoring At Coso Geothermal Area (1980) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 1980 Usefulness useful DOE-funding Unknown Exploration Basis Determine extent of low velocity body Notes An area showing approximately 0.2-s excess travel time that migrates with changing source azimuth, suggesting that the area is the 'delay shadow' produced by a deep, low-velocity body. Inversion of the relative residual data for three-dimensional velocity structure determines the lateral variations in velocity to a depth of 22.5 km beneath the array. An intense low-velocity body, which coincides with the surface expressions of late Pleistocene rhyolitic volcanism, high heat flow, and hydrothermal activity,

15

Teleseismic-Seismic Monitoring At Walker-Lane Transitional Zone Region  

Open Energy Info (EERE)

At Walker-Lane Transitional Zone Region At Walker-Lane Transitional Zone Region (Biasi, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Walker-Lane Transitional Zone Region (Biasi, Et Al., 2009) Exploration Activity Details Location Walker-Lane Transition Zone Geothermal Region Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin Retrieved from "http://en.openei.org/w/index.php?title=Teleseismic-Seismic_Monitoring_At_Walker-Lane_Transitional_Zone_Region_(Biasi,_Et_Al.,_2009)&oldid=425676"

16

Teleseismic-Seismic Monitoring At Long Valley Caldera Area (Newman, Et Al.,  

Open Energy Info (EERE)

Long Valley Caldera Area (Newman, Et Al., Long Valley Caldera Area (Newman, Et Al., 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Long Valley Caldera Area (Newman, Et Al., 2006) Exploration Activity Details Location Long Valley Caldera Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness not indicated DOE-funding Unknown Notes At shallow depths in the caldera References Andrew V. Newman, Timothy H. Dixon, Noel Gourmelen (2006) A Four-Dimensional Viscoelastic Deformation Model For Long Valley Caldera, California, Between 1995 And 2000 Retrieved from "http://en.openei.org/w/index.php?title=Teleseismic-Seismic_Monitoring_At_Long_Valley_Caldera_Area_(Newman,_Et_Al.,_2006)&oldid=425656"

17

Teleseismic-Seismic Monitoring At Coso Geothermal Area (2011-2012) | Open  

Open Energy Info (EERE)

2012) 2012) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (2011-2012) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 2011 - 2012 Usefulness not indicated DOE-funding Unknown Exploration Basis Map hydraulic structure within the field from seismic data Notes 2011: 16 years of seismicity were analyzed to improve hypocentral locations and simultaneously invert for the seismic velocity structure within the Coso Geothermal Field (CGF). The CGF has been continuously operated since the 1980's. 2012: 14 years of seismicity in the Coso Geothermal Field were relocated using differential travel times and simultaneously invert for

18

Teleseismic-Seismic Monitoring At Coso Geothermal Area (2004) | Open Energy  

Open Energy Info (EERE)

) ) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (2004) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 2004 Usefulness not indicated DOE-funding Unknown Exploration Basis Analyze seismic data to develop reservoir models that characterize the geothermal system Notes Large-amplitude, secondary arrivals are modeled as scattering anomalies. Polarization and ray tracing methods determine the orientation and location of the scattering body. Two models are proposed for the scatterer: (1) a point scatterer located anywhere in a one-dimensional (1-D), layered velocity model; and (2) a dipping interface between two homogeneous half

19

Teleseismic-Seismic Monitoring At Coso Geothermal Area (1983-1985) | Open  

Open Energy Info (EERE)

Coso Geothermal Area (1983-1985) Coso Geothermal Area (1983-1985) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (1983-1985) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 1983 - 1985 Usefulness not indicated DOE-funding Unknown Exploration Basis To study anomalous shear wave attenuation in the shallow crust Notes V s and V p wave amplitudes were measured from vertical component seismograms of earthquakes that occurred in the Coso-southern Sierra Nevada region from July 1983 to 1985. Seismograms of 16 small earthquakes show SV amplitudes which are greatly diminished at some azimuths and takeoff angles, indicating strong lateral variations in S wave attenuation in the

20

Teleseismic-Seismic Monitoring At Coso Geothermal Area (2005) | Open Energy  

Open Energy Info (EERE)

Coso Geothermal Area (2005) Coso Geothermal Area (2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (2005) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 2005 Usefulness not indicated DOE-funding Unknown Exploration Basis More detailed analysis of microearthquakes over a longer period of time Notes The permanent 18-station network of three-component digital seismometers at the seismically active Coso geothermal area, California, provides high-quality microearthquake (MEQ) data that are well suited to investigating temporal variations in structure related to processes within the geothermal reservoir. A preliminary study (Julian, et al. 2003; Julian

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Teleseismic-Seismic Monitoring At Kilauea Summit Area (Chouet & Aki, 1981)  

Open Energy Info (EERE)

Summit Area (Chouet & Aki, 1981) Summit Area (Chouet & Aki, 1981) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Kilauea Summit Area (Chouet & Aki, 1981) Exploration Activity Details Location Kilauea Summit Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness not indicated DOE-funding Unknown Notes Our passive seismic survey revealed a surprisingly high and sustained activity of local seismic events originating within the crust of Kilauea Iki. We recorded about 8000 events in a single day of operation at nail 17 with a seismograph having a peak magnification of 280,000 at 60 Hz (Fig. 10). References Bernard Chouet, Kehti Aki (1981) Seismic Structure And Seismicity Of The Cooling Lava Lake Of Kilauea Iki, Hawaii

22

Teleseismic-Seismic Monitoring At Kilauea Summit Area (Keller, Et Al.,  

Open Energy Info (EERE)

At Kilauea Summit Area (Keller, Et Al., At Kilauea Summit Area (Keller, Et Al., 1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Kilauea Summit Area (Keller, Et Al., 1979) Exploration Activity Details Location Kilauea Summit Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness useful DOE-funding Unknown Notes Kilauea volcano has high seismicity, most of which is associated with specific fault zones on the volcano and with movement of magma at depth (Koyanagi and Endo, 1971; Koyanagi et al., 1976). Certain groups of earthquakes have been observed at very shallow depths, however, and some of these have been concentrated in a zone that lies near the resistivity anomaly and the center of inflation. The data show that this shallow

23

Teleseismic-Seismic Monitoring At Coso Geothermal Area (1996-2004) | Open  

Open Energy Info (EERE)

4) 4) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (1996-2004) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 1996 - 2004 Usefulness useful DOE-funding Unknown Exploration Basis To look at time dependent seismic tomography Notes Local-earthquake tomographic images were calculated for each of the years 1996 - 2004 using arrival times from the U.S. Navy's permanent seismometer network. The results show irregular strengthening with time of the wave-speed ratio V p/V s at shallow depths. The period from 1996 through 2006 was studied, and the results to date using the traditional method show, for a 2-km horizontal grid spacing, an irregular strengthening

24

Teleseismic-Seismic Monitoring At Coso Geothermal Area (2006) | Open Energy  

Open Energy Info (EERE)

Coso Geothermal Area (2006) Coso Geothermal Area (2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (2006) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 2006 Usefulness useful DOE-funding Unknown Exploration Basis To assess the benefits of surface seismic surveys Notes Different migration procedures were applied to image a synthetic reservoir model and seismic data. After carefully preprocessing seismic data, the 2-D and 2.5-D pre-stack depth migration of line 109 in the Coso Geothermal Field shows a well defined reflector at about 16,000 ft depth. Compared to the 2-D pre-stack migrated image, the 2.5-D pre-stack migrated image

25

Teleseismic-Seismic Monitoring At Coso Geothermal Area (1988) | Open Energy  

Open Energy Info (EERE)

Coso Geothermal Coso Geothermal Area (1988) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 1988 Usefulness useful DOE-funding Unknown Exploration Basis To analyze three-dimensional Vp/Vs variation Notes A tomographic inversion for the 3D variations of the Vp/V s, the ratio of compressional to shear velocity, was performed. Iterative back projection of 2966 shear and compressional wave travel time residuals from local earthquakes recorded on vertical instruments reveals that Vp/Vs is generally high at the surface and decreases systematically to 10 km depth. Near Devil's Kitchen in the Coso Geothermal Area, Vp/Vs values are very low near the surface, consistent with measured values for steam-dominated

26

Teleseismic-Seismic Monitoring At Clear Lake Area (Skokan, 1993) | Open  

Open Energy Info (EERE)

Clear Lake Area Clear Lake Area (Skokan, 1993) Exploration Activity Details Location Clear Lake Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date Usefulness not indicated DOE-funding Unknown Notes Figure 4 illustrates seismicity from January of 1969 to June of 1977 (Rapolla and Keller, 1984). During this span, most of the seismicity occurred in the region of the Geysers geothermal field. Additional clustered activity was noted to the north and east of the Collayomi Fault in the Clear Lake region. Curiously, no unusual earthquake activity was noted along the major trend of the Collayomi Fault. Instead, the Collayomi Fault seems to separate two areas of active seismicity. References Catherine K. Skokan (1993) Overview Of Electromagnetic Methods Applied In Active Volcanic Areas Of Western United States

27

Category:Passive Seismic Techniques | Open Energy Information  

Open Energy Info (EERE)

has the following 2 subcategories, out of 2 total. M Micro-Earthquake 1 pages T Teleseismic-Seismic Monitoring 1 pages Pages in category "Passive Seismic...

28

Teleseismic-Seismic Monitoring At Long Valley Caldera Geothermal...  

Open Energy Info (EERE)

and components of two continuous GPS time series. Additionally, the model explains the spatial extent of deformation observed by InSAR data covering the 1997-98 inflation...

29

Teleseismic-Seismic Monitoring At Valles Caldera - Redondo Geothermal...  

Open Energy Info (EERE)

teleseismic events were recorded at numerous sites along a line spanning the ring fracture and at several sites outside of the caldera. References Peter M. Roberts, Keiiti Aki,...

30

Teleseismic-Seismic Monitoring At Yellowstone Region (Husen,...  

Open Energy Info (EERE)

Activity Date Usefulness useful DOE-funding Unknown References Stephan Husen, Robert B. Smith, Gregory P. Waite (2004) Evidence For Gas And Magmatic Sources Beneath The Yellowstone...

31

Teleseismic-Seismic Monitoring At Valles Caldera - Sulphur Springs...  

Open Energy Info (EERE)

Lee Steck (1997) Heterogeneous Structure Around the Jemez Volcanic Field, New Mexico, USA, as Inferred from the Envelope Inversion of Active-Experiment Seismic Data Additional...

32

Teleseismic-Seismic Monitoring At Northern Basin & Range Region...  

Open Energy Info (EERE)

Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin...

33

Teleseismic-Seismic Monitoring At Walker-Lane Transitional Zone...  

Open Energy Info (EERE)

Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin...

34

Teleseismic-Seismic Monitoring At Nw Basin & Range Region (Biasi...  

Open Energy Info (EERE)

Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin...

35

Teleseismic-Seismic Monitoring At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

Unknown References Glenn Biasi, Leiph Preston, Ileana Tibuleac (2009) Body Wave Tomography For Regional Scale Assessment Of Geothermal Indicators In The Western Great Basin...

36

Teleseismic-Seismic Monitoring At Valles Caldera - Sulphur Springs...  

Open Energy Info (EERE)

DOE-funding Unknown Exploration Basis This study reports on results of the Jemez Tomography Experiment (JTEX), a multidisciplinary effort to understand the structure of the...

37

Micro-Earthquake | Open Energy Information  

Open Energy Info (EERE)

Micro-Earthquake Micro-Earthquake Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Micro-Earthquake Details Activities (33) Areas (16) Regions (2) NEPA(1) Exploration Technique Information Exploration Group: Geophysical Techniques Exploration Sub Group: Seismic Techniques Parent Exploration Technique: Passive Seismic Techniques Information Provided by Technique Lithology: Stratigraphic/Structural: Fault zones, permeable pathways Hydrological: Fluid type- liquid or steam Thermal: Dictionary.png Micro-Earthquake: The micro-earthquake technique (MEQ), also known as microseismic, utilizes vibrations in the subsurface to locate permeable pathways and determine fluid phase. Other definitions:Wikipedia Reegle Use in Geothermal Exploration Ground noise and micro-earthquakes (MEQ) may be utilized in the

38

Micro-Earthquake At Kilauea East Rift Area (Thomas, 1986) | Open Energy  

Open Energy Info (EERE)

Micro-Earthquake At Kilauea East Rift Area (Thomas, Micro-Earthquake At Kilauea East Rift Area (Thomas, 1986) Exploration Activity Details Location Kilauea East Rift Area Exploration Technique Micro-Earthquake Activity Date Usefulness not indicated DOE-funding Unknown Notes Microseismic and ground noise studies were performed along the East Rift Zone in an effort to identify areas in which earthquake activity might suggest rock fracturing as a result of cold water coming into contact with heated reservoir rocks (Furumoto, 1978a). One of the microseismic surveys utilized an array of seven seismometers to monitor earthquake activity in the vicinity of the then proposed site of the HGP-A well (Fig. 53) (Suyenaga and Furumoto, 1978). The second microearthquake study utilized only two seismometers located near the junction of the Pahoa-Kalapana and

39

Micro-Earthquake At Raft River Geothermal Area (1982) | Open Energy  

Open Energy Info (EERE)

) ) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (1982) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1982 Usefulness not indicated DOE-funding Unknown Exploration Basis Develop a background seismicity before power production begins Notes Local seismic networks were established to monitor the background seismicity prior to initiation of geothermal power production. The Raft River study area is currently seismically quiet down to the level of approximately magnitude one. References Zandt, G.; Mcpherson, L.; Schaff, S.; Olsen, S. (1 May 1982) Seismic baseline and induction studies- Roosevelt Hot Springs, Utah and

40

Micro-Earthquake At Roosevelt Hot Springs Geothermal Area (Zandt...  

Open Energy Info (EERE)

Activity Details Location Roosevelt Hot Springs Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1982 Usefulness not indicated DOE-funding Unknown...

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Micro-Earthquake At North Brawley Geothermal Area (Hauksson,...  

Open Energy Info (EERE)

Hauksson, Et Al., 2012) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At North Brawley Geothermal Area (Hauksson, Et Al.,...

42

Micro-Earthquake At Marysville Mt Area (Blackwell) | Open Energy  

Open Energy Info (EERE)

Area (Blackwell) Area (Blackwell) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Marysville Mt Area (Blackwell) Exploration Activity Details Location Marysville Mt Area Exploration Technique Micro-Earthquake Activity Date Usefulness not indicated DOE-funding Unknown Notes A seismic ground noise was carried out but the ground noise in the anomaly area (and the surrounding region) was extremely low, approximately 4 orders of magnitude below that observed in the geothermal areas in the Salton Sea between 1-10 Hz (in units of power density). Because of this very low background noise the micro-earthquake survey was possible with instrument gains well in excess of a million. Regional micro-earthquake activity was located within about 15 km of the geothermal area but no micro-earthquakes

43

Micro-Earthquake At Roosevelt Hot Springs Geothermal Area (1982) | Open  

Open Energy Info (EERE)

Geothermal Area (1982) Geothermal Area (1982) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Roosevelt Hot Springs Geothermal Area (1982) Exploration Activity Details Location Roosevelt Hot Springs Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1982 Usefulness not indicated DOE-funding Unknown Exploration Basis Develop a background seismicity before power production begins Notes Local seismic networks were established to monitor the background seismicity prior to initiation of geothermal power production. The Raft River study area is currently seismically quiet down to the level of approximately magnitude one. References Zandt, G.; Mcpherson, L.; Schaff, S.; Olsen, S. (1 May 1982) Seismic baseline and induction studies- Roosevelt Hot Springs, Utah and

44

Micro-Earthquake At Geysers Geothermal Area (2011) | Open Energy  

Open Energy Info (EERE)

Geothermal Area (2011) Geothermal Area (2011) Exploration Activity Details Location Geysers Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine seismicity before and after reservoir stimulation for EGS Notes The overall goal is to gather high resolution seismicity data before, during and after stimulation activities at the EGS projects. This will include both surface and borehole deployments (as necessary in available boreholes) to provide high quality seismic data for improved processing and interpretation methodologies. This will allow the development and testing of seismic methods for understanding the performance of the EGS systems, as well as aid in developing induced seismicity mitigation techniques that can

45

Micro-Earthquake (Majer, 2003) | Open Energy Information  

Open Energy Info (EERE)

(Majer, 2003) (Majer, 2003) Exploration Activity Details Location Unspecified Exploration Technique Micro-Earthquake Activity Date Usefulness not indicated DOE-funding Unknown Notes The goal of this work is to evaluate the most promising methods and approaches that may be used for improved geothermal exploration and reservoir assessment. It is not a comprehensive review of all seismic methods used to date in geothermal environments. This work was motivated by a need to assess current and developing seismic technology that if applied in geothermal cases may greatly improve the chances for locating new geothermal resources and/or improve assessment of current ones. References E. L. Majer (2003) 3-D Seismic Methods For Geothermal Reservoir Exploration And Assessment-Summary

46

Micro-Earthquake At Coso Geothermal Area (2005) | Open Energy Information  

Open Energy Info (EERE)

5) 5) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Coso Area (2005) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2005 Usefulness useful DOE-funding Unknown Notes Characterization of 3D Fracture Patterns at The Geysers and Coso Geothermal Reservoirs by Shear-wave Splitting, Rial, Elkibbi, Yang and Pereyra. The raw data for the project consists of seismographic recordings of microearthquakes (MEQ) detected over many years by arrays of sensors at both The Geysers and Coso. References Patrick Laney (2005) Federal Geothermal Research Program Update - Fiscal Year 2004 Retrieved from "http://en.openei.org/w/index.php?title=Micro-Earthquake_At_Coso_Geothermal_Area_(2005)&oldid=475476"

47

Micro-Earthquake At Raft River Geothermal Area (2011) | Open Energy  

Open Energy Info (EERE)

Micro-Earthquake At Raft River Geothermal Area (2011) Micro-Earthquake At Raft River Geothermal Area (2011) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine seismicity before and after reservoir stimulation for EGS Notes The overall goal is to gather high resolution seismicity data before, during and after stimulation activities at the EGS projects. This will include both surface and borehole deployments to provide high quality seismic data for improved processing and interpretation methodologies. This will allow the development and testing of seismic methods for understanding the performance of the EGS systems, as well as aid in developing induced seismicity mitigation techniques that can be used for a variety of EGS

48

Micro-Earthquake At Geysers Area (Laney, 2005) | Open Energy Information  

Open Energy Info (EERE)

Laney, 2005) Laney, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Geysers Area (Laney, 2005) Exploration Activity Details Location Geysers Area Exploration Technique Micro-Earthquake Activity Date Usefulness useful DOE-funding Unknown Notes Characterization of 3D Fracture Patterns at The Geysers and Coso Geothermal Reservoirs by Shear-wave Splitting, Rial, Elkibbi, Yang and Pereyra. The raw data for the project consists of seismographic recordings of microearthquakes (MEQ) detected over many years by arrays of sensors at both The Geysers and Coso. References Patrick Laney (2005) Federal Geothermal Research Program Update - Fiscal Year 2004 Retrieved from "http://en.openei.org/w/index.php?title=Micro-Earthquake_At_Geysers_Area_(Laney,_2005)&oldid=389456

49

Micro-Earthquake At Coso Geothermal Area (1993-1994) | Open Energy  

Open Energy Info (EERE)

1994) 1994) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Coso Geothermal Area (1993-1994) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1993 - 1994 Usefulness useful DOE-funding Unknown Exploration Basis Multiplet analysis Notes Instances of microseismicity in seismic doublets which are co-located hypocenters that appear to have nearly identical waveforms were searched for. Using 1085 high-quality events from 1993 to 1994, they identified numerous doublets, some occurring within minutes of each other. The hypocentral data was subdivided into spatial clusters to reduce the computational burden and evaluated multiple cross-correlation pairs,

50

Micro-Earthquake At Raft River Geothermal Area (1979) | Open Energy  

Open Energy Info (EERE)

9) 9) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1979 Usefulness not indicated DOE-funding Unknown Exploration Basis Refraction Survey Notes Interpretation of seismic refraction recordings in the area yielded compressional velocities from near the surface to the crystalline basement at a maximum depth of approximately 1600 m. The results show a complex sequence of sediments and volcanic flows overlying basement. Velocities in the sedimentary section vary laterally. Correlation with well data suggests that zones of higher velocities may correspond to zones where sediments are

51

Micro-Earthquake At Coso Geothermal Area (2011) | Open Energy Information  

Open Energy Info (EERE)

) ) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Coso Geothermal Area (2011) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis To analyze temporal velocity variations Notes Microseismic data recorded between 1996 and 2008 was used to determine the temporally varying seismic velocity of the Coso geothermal field. In this study, the double difference tomography method was applied to simultaneously locate a suite of microseismic events and determine the compressional and shear wave velocity as well as their ratio. References Seher, T.; Zhang, H.; Fehler, M.; Yu, H.; Soukhovitskaya, V.;

52

Micro-Earthquake At Newberry Caldera Geothermal Area (2011) | Open Energy  

Open Energy Info (EERE)

Area (2011) Area (2011) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Newberry Caldera Geothermal Area (2011) Exploration Activity Details Location Newberry Caldera Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine seismicity before and after reservoir stimulation for EGS Notes The overall goal is to gather high resolution seismicity data before, during and after stimulation activities at the EGS projects. This will include both surface and borehole deployments (as necessary in available boreholes) to provide high quality seismic data for improved processing and interpretation methodologies. This will allow the development and testing

53

Micro-Earthquake At Coso Geothermal Area (2002-2005) | Open Energy  

Open Energy Info (EERE)

-2005) -2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Coso Geothermal Area (2002-2005) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2002 - 2005 Usefulness not indicated DOE-funding Unknown Exploration Basis To improve understanding of the subsurface fracture system Notes A shear-wave splitting technique was applied on a set of high quality, locally recorded microearthquake (MEQ) data. Four major fracture directions have been identified from the seismograms recorded by the permanent 16-station down-hole array: N10- 20W, NS, N20E, and N40-45E, of which the first and the third are the most prominent. All orientations are consistent with the known strike of local sets of faults and fractures at depth and at

54

Micro-Earthquake At Coso Geothermal Area (1987) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Coso Geothermal Area (1987) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1987 Usefulness not indicated DOE-funding Unknown Exploration Basis Analysis was done to link the zones of decreased P velocity to contemporary magmatic activity Notes Inversion of 4036 P wave travel time residuals from 429 local earthquakes using a tomographic scheme provides information about 3D upper crustal velocity variations in the Indian Wells Valley-Coso region of southeastern CA. The residuals are calculated relative to a Coso-specific velocity model, corrected for station elevation, weighted, and back-projected along

55

Micro-Earthquake At New York Canyon Geothermal Area (2011) | Open Energy  

Open Energy Info (EERE)

York Canyon Geothermal Area (2011) York Canyon Geothermal Area (2011) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At New York Canyon Geothermal Area (2011) Exploration Activity Details Location New York Canyon Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine seismicity before and after reservoir stimulation for EGS Notes The overall goal is to gather high resolution seismicity data before, during and after stimulation activities at the EGS projects. This will include both surface and borehole deployments (as necessary in available boreholes) to provide high quality seismic data for improved processing and interpretation methodologies. This will allow the development and testing

56

Micro-Earthquake At Coso Geothermal Area (1996) | Open Energy Information  

Open Energy Info (EERE)

) ) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Coso Geothermal Area (1996) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1996 Usefulness useful DOE-funding Unknown Exploration Basis Determine the attenuation structure Notes Pulse width data are used to invert for attenuation structure. The dataset consists of pulse width measurements of 838 microseismic events recorded on a seismic array of 16 downhole stations between August 1993 and March 1994. A broad region of low Q (≈ 30 to 37) is located at 0.5 to 1.2 km in depth below Devil's Kitchen, Nicol Prospects, and Coso Hot Springs. A vertical, low Q (≈ 36 in contrast with surrounding rock of 80) region is

57

Micro-Earthquake At Long Valley Caldera Area (Stroujkova & Malin, 2001) |  

Open Energy Info (EERE)

Long Valley Caldera Area (Stroujkova & Malin, 2001) Long Valley Caldera Area (Stroujkova & Malin, 2001) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Long Valley Caldera Area (Stroujkova & Malin, 2001) Exploration Activity Details Location Long Valley Caldera Area Exploration Technique Micro-Earthquake Activity Date Usefulness not indicated DOE-funding Unknown Notes Our preferred model for the unusual events is that of multiple ordinary earthquakes being triggered or forced by a fluid injection into a thin volcanic conduit. An example of such a structure would be a dike connected to one or more shear or wing fractures. In this model, resonant increases in pressure in the conduit would cause the shear fractures to fail seismically at fixed time delays. For the time delays seen at Long Valley,

58

Micro-Earthquake At Under Steamboat Springs Area (Warpinski, Et Al., 2004)  

Open Energy Info (EERE)

Under Steamboat Springs Area Under Steamboat Springs Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Under Steamboat Springs Area Exploration Technique Micro-Earthquake Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D. A. Sanchez, J. Nathwani (2004) Geothermal Resource Exploration And Definition Projects Retrieved from "http://en.openei.org/w/index.php?title=Micro-Earthquake_At_Under_Steamboat_Springs_Area_(Warpinski,_Et_Al.,_2004)&oldid=386654" Categories: Exploration Activities DOE Funded Activities What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services OpenEI partners with a broad range of international organizations to grow

59

Micro-Earthquake At Under Steamboat Springs Area (Warpinski, Et Al., 2002)  

Open Energy Info (EERE)

Under Steamboat Springs Area (Warpinski, Et Al., 2002) Under Steamboat Springs Area (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Under Steamboat Springs Area (Warpinski, Et Al., 2002) Exploration Activity Details Location Under Steamboat Springs Area Exploration Technique Micro-Earthquake Activity Date Usefulness useful DOE-funding Unknown Notes This project consisted of (1) a 3-D surface seismic survey conducted in the fall of 2000, (2) a micro-seismic survey run from November 2000 to April 200 1, and (3) a gravity survey conducted in April and May 2001. The 3-D surface seismic data are still being processed at this time, but initial results indicate that there are two major lineations of high velocity running orthogonal to each other which are presumably related to the fault

60

Micro-Earthquake At Coso Geothermal Area (2000) | Open Energy Information  

Open Energy Info (EERE)

0) 0) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Coso Geothermal Area (2000) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2000 Usefulness not indicated DOE-funding Unknown Exploration Basis Compare results of dense arrays with less densely spaced instruments Notes Results from a dense array of passive seismometers are presented. Data collected during the 18-month deployment of 16 dense mini-arrays in the region of the China Lake geothermal field near Ridgecrest, CA was used. The crustal structure within the geothermal field, its relationship to regional tectonic features, and search for an indication of mantle influence on volcanism was imaged. The mini-arrays consist of mostly short period

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Micro-Earthquake At Coso Geothermal Area (1992-1997) | Open Energy  

Open Energy Info (EERE)

2-1997) 2-1997) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Micro-Earthquake At Coso Geothermal Area (1992-1997) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1992 - 1997 Usefulness useful DOE-funding Unknown Exploration Basis Characterize subsurface fracture patterns in the Coso geothermal reservoir by analyzing shear-wave splitting of microearthquake seismorgrams Notes A large number of microearthquake seismograms have been recorded by a downhole, three-component seismic network. Shear-wave splitting induced by the alignment of cracks in the reservoir has been widely observed in the recordings. Over 100 events with body wave magnitude greater than 1.0 from

62

Seismic Monitoring a Critical Step in EGS Development  

Broader source: Energy.gov [DOE]

The ability to accurately locate and characterize the release of seismic energy, generated from micro earthquakes(MEQ) is of paramount importance to the development and monitoring of EGS. A small innovative business, MagiQTechnologies Inc. has devel

63

Micro-Earthquake At Desert Peak Geothermal Area (2011) | Open Energy  

Open Energy Info (EERE)

Desert Peak Geothermal Area Desert Peak Geothermal Area (2011) Exploration Activity Details Location Desert Peak Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine seismicity before and after reservoir stimulation for EGS Notes The overall goal is to gather high resolution seismicity data before, during and after stimulation activities at the EGS projects. This will include both surface and borehole deployments (as necessary in available boreholes) to provide high quality seismic data for improved processing and interpretation methodologies. This will allow the development and testing of seismic methods for understanding the performance of the EGS systems, as well as aid in developing induced seismicity mitigation techniques that can

64

Micro-Earthquake At Brady Hot Springs Geothermal Area (2011) | Open Energy  

Open Energy Info (EERE)

Geothermal Area Geothermal Area (2011) Exploration Activity Details Location Brady Hot Springs Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine seismicity before and after reservoir stimulation for EGS Notes The overall goal is to gather high resolution seismicity data before, during and after stimulation activities at the EGS projects. This will include both surface and borehole deployments (as necessary in available boreholes) to provide high quality seismic data for improved processing and interpretation methodologies. This will allow the development and testing of seismic methods for understanding the performance of the EGS systems, as well as aid in developing induced seismicity mitigation techniques that can

65

Micro-Earthquake At Coso Geothermal Area (2007) | Open Energy Information  

Open Energy Info (EERE)

Coso Geothermal Area (2007) Coso Geothermal Area (2007) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2007 Usefulness not indicated DOE-funding Unknown Exploration Basis Develop and test a tool to better analyze microearthquake data Notes A GUI-based interface was developed to use inversion software that greatly increases its ease of use and makes feasible analyzing larger numbers of earthquakes than previously was practical. Examples are shown from an injection experiment conducted in well 34-9RD2, on the East Flank. This tight well was re-drilled February - March 2005. Pervasive porosity and fractures were encountered at about 2660 m depth. These mud losses induced a 50-minute swarm of 44 microearthquakes, with magnitudes in the range -0.3

66

Micro-Earthquake At Coso Geothermal Area (1974) | Open Energy Information  

Open Energy Info (EERE)

Coso Geothermal Area (1974) Coso Geothermal Area (1974) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Micro-Earthquake Activity Date 1974 Usefulness useful DOE-funding Unknown Exploration Basis To determine the background level of seismicity before any drilling related to production takes place. Notes Two different arrays of portable high-gain seismographs were installed- measurements taken over thirty three days; completed 9 calibration blasts. The microearthquake activity changed considerably including days which had only a few events while others had as many as 100 or more distinct local events; more than two thousand events with S-P times of less than three seconds were detected; observed low value for Poisson's ratio which indicated that the Coso geothermal system is a vapor-dominated system

67

Monitoring  

SciTech Connect (OSTI)

The invention provides apparatus and methods which facilitate movement of an instrument relative to an item or location being monitored and/or the item or location relative to the instrument, whilst successfully excluding extraneous ions from the detection location. Thus, ions generated by emissions from the item or location can successfully be monitored during movement. The technique employs sealing to exclude such ions, for instance, through an electro-field which attracts and discharges the ions prior to their entering the detecting location and/or using a magnetic field configured to repel the ions away from the detecting location.

Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

2004-11-23T23:59:59.000Z

68

The Northwest Geysers EGS Demonstration Project Phase 1: Pre-stimulation coupled geomechanical modeling to guide stimulation and monitoring plans  

SciTech Connect (OSTI)

This paper presents activities and results associated with Phase 1 (pre-stimulation phase) of an Enhanced Geothermal System (EGS) demonstration project at the northwest part of The Geysers geothermal field, California. The paper presents development of a 3-D geological model, coupled thermal-hydraulic-mechanical (THM) modeling of proposed stimulation injection as well as current plans for stimulation and monitoring of the site. The project aims at creating an EGS by directly and systematically injecting cool water at relatively low pressure into a known High Temperature (about 280 to 350 C) Zone (HTZ) located under the conventional (240 C) steam reservoir at depths of {approx}3 km. Accurate micro-earthquake monitoring initiated before the start of the injection will be used as a tool for tracking the development of the EGS and monitoring changes in microseismicity. We first analyzed historic injection and micro-earthquake data from an injection well (Aidlin 11) located about 3 miles to the west of the new EGS demonstration area. Thereafter, we used the same modeling approach to predict the likely extent of the zone of enhanced permeability for a proposed initial injection in two wells (Prati State 31 and Prati 32) at the new EGS demonstration area. Our modeling indicates that the proposed injection scheme will provide additional steam production in the area by creating a zone of permeability enhancement extending about 0.5 km from each injection well which will connect to the overlying conventional steam reservoir, in agreement with the conclusions of Nielson and Moore (2000).

Rutqvist, J.; Dobson, P.F.; Oldenburg, C.M.; Garcia, J.; Walters, M.

2010-10-20T23:59:59.000Z

69

Micro-Earthquake At Long Valley Caldera Geothermal Area (Foulger...  

Open Energy Info (EERE)

Microearthquakes At Long Valley Caldera, California, Provide Evidence For Hydraulic Fracturing Additional References Retrieved from "http:en.openei.orgw...

70

Micro-Earthquake At Geysers Area (Erten & Rial, 1999) | Open...  

Open Energy Info (EERE)

useful DOE-funding Unknown References D. Erten, J. A. Rial (1999) Characterization Of Fracture Patterns In The Geysers Geothermal Reservoir By Shear-Wave Splitting Additional...

71

Micro-Earthquake At Waunita Hot Springs Geothermal Area (Lange...  

Open Energy Info (EERE)

was to assess the extent of active fault failure and the potential importance of fracture permeability in the subsurface surrounding the hot springs. Notes The first...

72

Micro-Earthquake At Roosevelt Hot Springs Geothermal Area (Ward...  

Open Energy Info (EERE)

Area. References S. H. Ward, W. T. Parry, W. P. Nash, W. R. Sill, K. L. Cook, R. B. Smith, D. S. Chapman, F. H. Brown, J. A. Whelan, J. R. Bowman (1978) A Summary of the...

73

Micro-Earthquake At Neal Hot Springs Geothermal Area (Nichols...  

Open Energy Info (EERE)

seismic sensor, a data acquisition system that records information onto flash drives, a solar panel and battery, and a fence to keep cows out. References Scott Nichols, David...

74

Micro-Earthquake At Kilauea East Rift Geothermal Area (Kenedi...  

Open Energy Info (EERE)

to this study: Shear wave splitting, double difference earthquake location, and 3-D tomography. This study was beneficial in helping to improve the local velocity model, identify...

75

Monitoring materials  

DOE Patents [OSTI]

The apparatus and method provide techniques for effectively implementing alpha and/or beta and/or gamma monitoring of items or locations as desired. Indirect alpha monitoring by detecting ions generated by alpha emissions, in conjunction with beta and/or gamma monitoring is provided. The invention additionally provides for screening of items prior to alpha monitoring using beta and/or gamma monitoring, so as to ensure that the alpha monitoring apparatus is not contaminated by proceeding direct to alpha monitoring of a heavily contaminated item or location. The invention provides additional versatility in the emission forms which can be monitored, whilst maintaining accuracy and avoiding inadvertent contamination.

Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

2002-01-01T23:59:59.000Z

76

Performance Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Optimization Performance Monitoring Performance Monitoring A redirector page has been set up without anywhere to redirect to. Last edited: 2014-08-25 14:37:27...

77

Ion Monitoring  

DOE Patents [OSTI]

The apparatus and method provide a technique for significantly reducing capacitance effects in detector electrodes arising due to movement of the instrument relative to the item/location being monitored in ion detection based techniques. The capacitance variations are rendered less significant by placing an electrically conducting element between the detector electrodes and the monitored location/item. Improved sensitivity and reduced noise signals arise as a result. The technique also provides apparatus and method suitable for monitoring elongate items which are unsuited to complete enclosure in one go within a chamber. The items are monitored part by part as the pass through the instrument, so increasing the range of items or locations which can be successfully monitored.

Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

2003-11-18T23:59:59.000Z

78

Electrostatic monitoring  

DOE Patents [OSTI]

The apparatus and method provide a technique for more simply measuring alpha and/or beta emissions arising from items or locations. The technique uses indirect monitoring of the emissions by detecting ions generated by the emissions, the ions being attracted electrostatically to electrodes for discharge of collection. The apparatus and method employ a chamber which is sealed around the item or location during monitoring with no air being drawn into or expelled from the chamber during the monitoring process. A simplified structure and operations arises as a result, but without impairing the efficiency and accuracy of the detection technique.

Orr, Christopher Henry (Cumbria, GB); Luff, Craig Janson (Cumbria, GB); Dockray, Thomas (Cumbria, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

2001-01-01T23:59:59.000Z

79

Seismic Monitoring - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Curation Services Ecological Monitoring Environmental Surveillance Meteorology and Climatology Services Seismic Monitoring Seismic Monitoring Email Email Page | Print Print Page...

80

Weld Monitor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring of Laser Beam Welding Monitoring of Laser Beam Welding Using Infrared Weld Emissions P. G. Sanders, J. S. Keske, G. Kornecki, and K. H. Leong Technology Development Division Argonne National Laboratory Argonne, IL 60439 USA The submitted manuscript has been authorized by a contractor of the U. S. Government under contract No. W-31-109-ENG-38. Accordingly, the U. S. Government retains a non-exclusive, royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for U. S. Government purposes. Abstract A non-obtrusive, pre-aligned, solid-state device has been developed to monitor the primary infrared emissions during laser welding. The weld monitor output is a 100-1000 mV signal that depends on the beam power and weld characteristics. The DC level of this signal is related to weld

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Environmental Monitoring  

Science Journals Connector (OSTI)

Cell processing facilities should implement and maintain a program of environmental monitoring regardless of whether product manufacturing occurs in an unclassified laboratory space or in a Class 10,000 cleanroom

A. Gee MI Biol; PhD; D.L. Lyon MT (ASCP); CLSp (MB)

2009-01-01T23:59:59.000Z

82

Micro-Earthquake At Geysers Area (Malin, Et Al., 2004) | Open...  

Open Energy Info (EERE)

M. Simiyu, Anastasia Stroujkova, Windy McCausland (2004) A Comprehensive Study Of Fracture Patterns And Densities In The Geysers Geothermal Reservoir Using Microearthquake...

83

Micro-Earthquake At Fenton Hill HDR Geothermal Area (Brown, 2009...  

Open Energy Info (EERE)

Dennis, Donald S. Dreesen, Leigh S. House, Hugh D. Murphy, Bruce A. Robinson, Morton C. Smith (1987) The US Hot Dry Rock Project Donald S. Dreesen, Mark V. Malzahn, Michael C....

84

Monitoring Infrastructure Capacity Monitoring Infrastructure Capacity  

E-Print Network [OSTI]

Levinson, D. (2000) Monitoring Infrastructure Capacity p. 165-181 in Land Market Monitoring for Smart Urban) task. Monitoring infrastructure capacity is at least as complex as monitoring urban land markets Levinson, D. (2000) Monitoring Infrastructure Capacity p. 165-181 in Land Market Monitoring for Smart Urban

Levinson, David M.

85

Restoration Monitoring-A Simple Photo Monitoring Method | Department...  

Energy Savers [EERE]

Restoration Monitoring-A Simple Photo Monitoring Method Restoration Monitoring-A Simple Photo Monitoring Method Restoration Monitoring-A Simple Photo Monitoring Method Restoration...

86

PDSF Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PDSF Monitoring PDSF Monitoring The plot below is a measure of the read and write rates a single user would experience via the PDSF batch system. Jobs are submitted sequentially every hour to the debug queue. If a jobs doesn't finish in 8 minutes, it is killed and a -1 rate is written out. The read rates are calculated by copying a directory containing 2 files totaling 274 MB from the eliza directories to the $TMPDIR on the node running the job. The write rates are calculated by untarring a tarball on the eliza directories. The write rates are typically around a factor of two slower than the read rates, because the data still has to travel to the compute node and then back to the eliza for writing. The I/O rates are taken from the ganglia monitoring and serve as a measure of the amount of

87

Tritium monitor  

DOE Patents [OSTI]

A system is described for continuously monitoring the concentration of tritium in an aqueous stream. The system pumps a sample of the stream to magnesium-filled combustion tube which reduces the sample to extract hydrogen gas. The hydrogen gas is then sent to an isotope separation device where it is separated into two groups of isotopes: a first group of isotopes containing concentrations of deuterium and tritium, and a second group of isotopes having substantially no deuterium and tritium. The first group of isotopes containing concentrations of deuterium and tritium is then passed through a tritium detector that produces an output proportional to the concentration of tritium detected. Preferably, the detection system also includes the necessary automation and data collection equipment and instrumentation for continuously monitoring an aqueous stream. 1 fig.

Chastagner, P.

1994-06-14T23:59:59.000Z

88

Tritium monitor  

DOE Patents [OSTI]

A system for continuously monitoring the concentration of tritium in an aqueous stream. The system pumps a sample of the stream to magnesium-filled combustion tube which reduces the sample to extract hydrogen gas. The hydrogen gas is then sent to an isotope separation device where it is separated into two groups of isotopes: a first group of isotopes containing concentrations of deuterium and tritium, and a second group of isotopes having substantially no deuterium and tritium. The first group of isotopes containing concentrations of deuterium and tritium is then passed through a tritium detector that produces an output proportional to the concentration of tritium detected. Preferably, the detection system also includes the necessary automation and data collection equipment and instrumentation for continuously monitoring an aqueous stream.

Chastagner, Philippe (Augusta, GA)

1994-01-01T23:59:59.000Z

89

Site Monitoring Area Maps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to the Site Monitoring Area (SMA) The Site Monitoring Area sampler Control measures (best management practices) installed at the Site Monitoring Area Structures such as...

90

Monitoring your job  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jobs Monitoring and Managing Jobs Monitoring and Managing Batch Jobs These are some basic commands for monitoring and modifiying batch jobs while they're queued or running. NERSC...

91

Utility Monitor September 2010  

E-Print Network [OSTI]

Utility Monitor September 2010 Why monitor utility syntax? Enforce and Maintain Company-Wide DB2 Utility Standards. Jennifer Nelson Product Specialist, Rocket Software © 2010 IBM Corporation © 2010............................................................................................................... iv 1 Why Monitor DB2 Utility Syntax

92

Structural Health Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Impedance Methods Lamb Wave Propagations Time Reversal Acoustics Sequential Probability Ratio Test Extreme Value Statistics Remote Monitoring Building upon previous...

93

Monitoring jobs with qs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jobs Monitoring jobs with qs Monitoring jobs with qs qs is an alternative tool to the SGE-provided qstat for querying the queue status developed at NERSC. qs provides an...

94

Corrosion monitoring apparatus  

DOE Patents [OSTI]

A corrosion monitoring device in an aqueous system which includes a formed crevice and monitoring the corrosion of the surfaces forming the crevice by the use of an a-c electrical signal.

Isaacs, Hugh S. (Shoreham, NY); Weeks, John R. (Stony Brook, NY)

1980-01-01T23:59:59.000Z

95

Multidimensionality of parental monitoring  

E-Print Network [OSTI]

This study explored the construct of parental monitoring and its relation to antisocial behavior in children. The factor structure of the Alabama Parenting Questionnaire Poor Monitoring/Supervision Scale (Frick, 1991) was examined to determine...

Secrest, Laura A

2012-06-07T23:59:59.000Z

96

Analysis of Injection-Induced Micro-Earthquakes in a Geothermal Steam Reservoir, The Geysers Geothermal Field, California  

E-Print Network [OSTI]

and Renewable Energy, Geothermal Technologies Program, ofwith energy extraction at The Geysers geothermal field. We

Rutqvist, J.

2008-01-01T23:59:59.000Z

97

Seismic Imaging and Monitoring  

SciTech Connect (OSTI)

I give an overview of LANL's capability in seismic imaging and monitoring. I present some seismic imaging and monitoring results, including imaging of complex structures, subsalt imaging of Gulf of Mexico, fault/fracture zone imaging for geothermal exploration at the Jemez pueblo, time-lapse imaging of a walkway vertical seismic profiling data for monitoring CO{sub 2} inject at SACROC, and microseismic event locations for monitoring CO{sub 2} injection at Aneth. These examples demonstrate LANL's high-resolution and high-fidelity seismic imaging and monitoring capabilities.

Huang, Lianjie [Los Alamos National Laboratory

2012-07-09T23:59:59.000Z

98

Environmental Monitoring Plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

99

Insulation Monitors Settings Selection  

Science Journals Connector (OSTI)

In the chapter general requirements set to insulation monitors selection in AC and DC networks ... given. Examples of regulations requirements for circuits insulation equivalent resistance are presented. Traditio...

Piotr Olszowiec

2013-01-01T23:59:59.000Z

100

Environmental monitoring plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Section 42: Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

using techniques that do not jeopardize the containment of waste in the disposal system. Ten monitoring parameters were identified in an analysis performed to fulfill the section...

102

Electronic Monitoring White Papers  

E-Print Network [OSTI]

the initial development costs. But if that system can be easily implemented in another area, those costs for operations, maintenance, and quality checks (QA & QC). The goal of video monitoring is to provide a cost monitoring programs in NMFS-managed fisheries where data extracted from video are used for science

103

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

104

HP Steam Trap Monitoring  

E-Print Network [OSTI]

Consumption Peak Demand Mgt Peak Demand Mgt Similar Weather Day Analysis Metering and Verafication Steam Meter Monitoring ? Peak Demand Management ? Steam Consumption Management ? Steam Bill Verification ? Measurement and Verification ... Consumption Peak Demand Mgt Peak Demand Mgt Similar Weather Day Analysis Metering and Verafication Steam Meter Monitoring ? Peak Demand Management ? Steam Consumption Management ? Steam Bill Verification ? Measurement and Verification ...

Pascone, S.

2011-01-01T23:59:59.000Z

105

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

106

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

107

Monitoring Jobs on Hopper  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Jobs Monitoring Jobs Monitoring Jobs Monitoring Edison Batch Jobs The batch system provides the command to monotor your jobs. We are listing the commands commonly used to submit and monitor the jobs. For more informaiton please refer to the man pages of these commands. Job Commands Command Description qsub batch_script Submits batch script to the queue. The output of qsub will be a jobid qdel jobid Deletes a job from the queue qhold jobid Puts a job on hold in the queue. qrls jobid Releases a job from hold. qalter [options] jobid Change attributes of submitted job. (See below.) qmove new_queue jobid Move job to new queue. Remember, the new queue must be one of the submission queues (premium, regular, or low) qstat -a Lists jobs in submission order (more useful than qstat without options) Also takes -u and -f [jobid]> options

108

CEMs turn monitoring giant  

SciTech Connect (OSTI)

Crucial to complying with environmental regulations is selecting appropriate pollution control equipment to capture or destroy regulated pollutants. But just as important is selecting a continuous emissions monitoring system (CEM). CEMs play a dual role in an overall compliance strategy. On one hand, they identify the type and quantity of emissions at a source as a first step for determining which regulatory requirements and control technologies are applicable. They also provide ongoing emissions data to demonstrate compliance with air and other environmental regulations. Facilities are required to monitor their processes with CEMs, or a comparable technology, under several titles of the Clean Air Act Amendments of 1990. CEMs meet regulatory requirements if they include a SO[sub 2] concentration monitor, nitrogen oxides (NO[sub x]) concentration monitor, volumetric flow monitor, opacity monitor, diluent gas monitor and data acquisition and handling system. The entire system and each subsystem has to be installed and certified before it can be used for compliance. A written quality assurance/quality control (QA/QC) plan for the CEMs must accompany the permit application. The acid rain rules also impose performance standards and frequent calibration checks to ensure the integrity of CEMs data.

White, J.R. (KVB/Analect, Irvine, CA (United States))

1993-08-01T23:59:59.000Z

109

Improve emissions monitoring  

SciTech Connect (OSTI)

Marathon`s Texas City refinery was subject to five separate EPA regulations in addition to a state program for monitoring and repairing fugitive leaks. In this case history, the refinery sought an organizational solution that reduced monitoring costs and kept the facility fully compliant with current state and federal regulations. Equally important, the new monitoring program incorporated flexibility for future emission-reduction requirements. The paper describes the solution, regulatory background, the previous system, leak-threshold consolidation, operator ownership, and projects benefits.

Vining, S.K. [Marathon Oil Co., Texas City, TX (United States)

1998-01-01T23:59:59.000Z

110

NETL: Ambient Monitoring - Steubenville Comprehensive Air Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Steubenville Comprehensive Air Monitoring Project (SCAMP) Steubenville Comprehensive Air Monitoring Project (SCAMP) The National Ambient Air Quality Standards for airborne fine particles (PM2.5) are based on the mass of PM2.5 measured at outdoor monitoring stations; however, most people spend the majority of their time indoors. In order to fully understand the relationship between ambient PM2.5 and human health effects, it is important to define how ambient PM2.5 concentrations and compositions compare to those actually breathed by humans during normal daily activities. The objective of SCAMP is to measure the concentrations of PM2.5 and other potential air pollutants at ambient monitoring stations in and around Steubenville, OH, and relate them to the pollutant concentrations in air that is actually breathed by people living in the area. Steubenville was chosen by DOE for this study because of the ability to integrate its results with those of the UORVP, and also because Steubenville was one of the six cities where correlations between ambient PM2.5 mass and adverse health effects had been noted. These correlations had been cited by EPA as one of the primary justifications for its 1997 ambient PM2.5 standards. Complete characterization of the relationships between ambient PM2.5 and human exposure, including the chemical components of PM2.5 at various locations, will provide a comprehensive database for use in subsequent epidemiological studies, long-range transport studies, and State Implementation Program development. CONSOL Energy is the primary performer of SCAMP, and will provide the necessary coordination and data integration between the various components of the study.

111

Monitoring Jobs on Hopper  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Jobs Monitoring Jobs Monitoring Jobs Monitoring Hopper Batch Jobs See the man pages for more options. The Job Information page has more information on current queue status, completed jobs, ALPS logs and job summary statistics. Job Commands Command Description qsub batch_script Submits batch script to the queue. The output of qsub will be a jobid qdel jobid Deletes a job from the queue qhold jobid Puts a job on hold in the queue. To delete a job from the hopper xfer queue users must add an additional parameter @hopper06 Example:6004861.hopper06@hopper06 qrls jobid Releases a job from hold. qalter [options] jobid Change attributes of submitted job. (See below.) qmove new_queue jobid Move job to new queue. Remember, the new queue must be one of the submission queues (premium, regular, or low)

112

Structural Health Monitoring Tools  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security, LLC 1 LA-CC-10-032 LA-UR 10-01259 1 Introduction to SHMTools SHMTools is a MATLAB package that facilitates the construction of structural health monitoring (SHM)...

113

Structure function monitor  

DOE Patents [OSTI]

Methods and apparatus for a structure function monitor provide for generation of parameters characterizing a refractive medium. In an embodiment, a structure function monitor acquires images of a pupil plane and an image plane and, from these images, retrieves the phase over an aperture, unwraps the retrieved phase, and analyzes the unwrapped retrieved phase. In an embodiment, analysis yields atmospheric parameters measured at spatial scales from zero to the diameter of a telescope used to collect light from a source.

McGraw, John T. (Placitas, NM); Zimmer, Peter C. (Albuquerque, NM); Ackermann, Mark R. (Albuquerque, NM)

2012-01-24T23:59:59.000Z

114

Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 2, Radiation Monitoring and Sampling  

SciTech Connect (OSTI)

The FRMAC Monitoring and Sampling Manual, Volume 2 provides standard operating procedures (SOPs) for field radiation monitoring and sample collection activities that are performed by the Monitoring group during a FRMAC response to a radiological emergency.

NSTec Aerial Measurement Systems

2012-07-31T23:59:59.000Z

115

Monitoring: The missing piece  

SciTech Connect (OSTI)

The U.S. National Environmental Policy Act (NEPA) of 1969 heralded in an era of more robust attention to environmental impacts resulting from larger scale federal projects. The number of other countries that have adopted NEPA's framework is evidence of the appeal of this type of environmental legislation. Mandates to review environmental impacts, identify alternatives, and provide mitigation plans before commencement of the project are at the heart of NEPA. Such project reviews have resulted in the development of a vast number of reports and large volumes of project-specific data that potentially can be used to better understand the components and processes of the natural environment and provide guidance for improved and efficient environmental protection. However, the environmental assessment (EA) or the more robust and intensive environmental impact statement (EIS) that are required for most major projects more frequently than not are developed to satisfy the procedural aspects of the NEPA legislation while they fail to provide the needed guidance for improved decision-making. While NEPA legislation recommends monitoring of project activities, this activity is not mandated, and in those situations where it has been incorporated, the monitoring showed that the EIS was inaccurate in direction and/or magnitude of the impact. Many reviews of NEPA have suggested that monitoring all project phases, from the design through the decommissioning, should be incorporated. Information gathered though a well-developed monitoring program can be managed in databases and benefit not only the specific project but would provide guidance how to better design and implement future activities designed to protect and enhance the natural environment. -- Highlights: NEPA statutes created profound environmental protection legislative framework. Contrary to intent, NEPA does not provide for definitive project monitoring. Robust project monitoring is essential for enhanced environmental management. Adaptive database framework is needed to accommodate project-monitoring data.

Bjorkland, Ronald, E-mail: r_bjorkland@hotmail.com

2013-11-15T23:59:59.000Z

116

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

117

Overview - WIPP Effluent Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Overview of the WIPP Effluent Monitoring Program Compliance with Title 40 CFR Part 191, Subpart A Environmental Standards for Management and Storage L. Frank-Supka, D. J. Harward, S. C. Casey May 2005 INTRODUCTION This document provides an overview of the effluent air monitoring activities at the Waste Isolation Pilot Plant (WIPP), in Carlsbad, New Mexico. The WIPP Effluent Monitoring Program is designed to comply with the U.S. Environmental Protection Agency (EPA) radiation protection standards for management and storage of spent nuclear fuel, high-level radioactive waste and transuranic (TRU)-waste at the WIPP. The standards issued by the EPA are contained in Title 40 Code of Federal Regulations (CFR), Part 191, Subpart A. The standards require the

118

Monitoring Jobs on Carver  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Jobs Monitoring Jobs Monitoring Jobs Overview Please see the man pages of the commands below for more options. The Job Information page has more information on current queue status, completed jobs, and job summary statistics. Command Description qsub batch_script Submit batch script to queue; returns job_id. qdel job_id Delete job from queue. qhold job_id Place job on hold in queue. qrls job_id Release held job. qalter Change attributes of submitted job. qmove new_queue job_id Move job to a different queue. qstat -a List jobs in submission order. qstat -f job_id Produce detailed report about job. qs List jobs in priority order. showq List jobs in priority order, categorized by job state. showstart job_id Produce estimate of start time for job. checkjob job_id Produce scheduling diagnostics for job.

119

Neutral beam monitoring  

DOE Patents [OSTI]

Method and apparatus for monitoring characteristics of a high energy neutral beam. A neutral beam is generated by passing accelerated ions through a walled cell containing a low energy neutral gas, such that charge exchange neutralizes the high energy ion beam. The neutral beam is monitored by detecting the current flowing through the cell wall produced by low energy ions which drift to the wall after the charge exchange. By segmenting the wall into radial and longitudinal segments various beam conditions are further identified.

Fink, Joel H. (Livermore, CA)

1981-08-18T23:59:59.000Z

120

Bridge Monitoring and Loading  

E-Print Network [OSTI]

#12;1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling simulations were conducted for a range of stone arch bridges spanning 5.0m to 32m. Traditional assessment procedures for the determination of both longitudinal and transverse bridge strengths were developed

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Bridge Monitoring and Loading  

E-Print Network [OSTI]

1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling and Assessment dimensional non- linear finite element simulations of a range of stone arch- bridges spanning 5.0m to 32m and novel assessment proce- dures for the determination of both longitudinal andtrans- verse bridge

122

Luminosity monitor at PEP  

SciTech Connect (OSTI)

The luminosity monitor system utilized by the MKII Detector and by the PEP operators is described. This system processes information from 56 photomultipliers and calculates independent luminosities for each of the 3 colliding bunches in PEP. Design considerations, measurement techniques, and sources of error in the luminosity measurement are discussed.

Fox, J.D.; Franklin, M.E.B.

1981-02-01T23:59:59.000Z

123

CERN GSM monitoring system  

E-Print Network [OSTI]

As a result of the tremendous development of GSM services over the last years, the number of related services used by organizations has drastically increased. Therefore, monitoring GSM services is becoming a business critical issue in order to be able to react appropriately in case of incident. In order to provide with GSM coverage all the CERN underground facilities, more than 50 km of leaky feeder cable have been deployed. This infrastructure is also used to propagate VHF radio signals for the CERNs fire brigade. Even though CERNs mobile operator monitors the network, it cannot guarantee the availability of GSM services, and for sure not VHF services, where signals are carried by the leaky feeder cable. So, a global monitoring system has become critical to CERN. In addition, monitoring this infrastructure will allow to characterize its behaviour over time, especially with LHC operation. Given that commercial solutions were not yet mature, CERN developed a system based on GSM probes and an application...

Ghabrous Larrea, C

2009-01-01T23:59:59.000Z

124

MONITORING DROUGHT Basic Climatology  

E-Print Network [OSTI]

MONITORING DROUGHT Basic Climatology Colorado Climate Center Funding provided by NOAA Sectoral? Streamflow? Plants wilting? Wildfire? Famine? Other? #12;Drought seems so obvious... Yet it remains of 2002 Drought -- Colorado's worst recent Drought August, 2002 #12;Percentage of US in Drought (D1-D4

125

CONTAMINANT MONITORING & RESEARCH SANFRANCISCOESTUARYINSTITUTE  

E-Print Network [OSTI]

supposed to be the conversion of DBW hardcopy monitoring data to electronic format, the data was already in electronic format. However, additional analysis of this data was necessary and a Tier 1 risk assessment................................................................................................ 5 Toxicity Reference Values for Risk Quotient Calculations

126

Realtime Webbased Telerehabilitation Monitoring  

E-Print Network [OSTI]

Therapy Abstract. Distance monitoring of rehabilitation exercises has been primarily conducted using two level of effort. The top of the screen displays messages, which the patient's application relays was tested with two subjects during a pilot trial in which the RARS was used to train individuals post

New Jersey, University of Medicine and Dentistry of

127

Wireless device monitoring systems and monitoring devices, and associated methods  

DOE Patents [OSTI]

Wireless device monitoring systems and monitoring devices include a communications module for receiving wireless communications of a wireless device. Processing circuitry is coupled with the communications module and configured to process the wireless communications to determine whether the wireless device is authorized or unauthorized to be present at the monitored area based on identification information of the wireless device. Methods of monitoring for the presence and identity of wireless devices are also provided.

McCown, Steven H; Derr, Kurt W; Rohde, Kenneth W

2014-05-27T23:59:59.000Z

128

Texas Rangeland Monitoring: Level Two  

E-Print Network [OSTI]

Monitoring is essential for good rangeland management. This leaflet explains how to monitor the condition of your rangeland by using line, belt and step-point transects, as well as grazing exclosures. Used consistently over time, these measures...

Hanselka, C. Wayne; Hart, Charles R.; McGinty, Allan

2006-10-09T23:59:59.000Z

129

Monitoring and Managing PDSF Jobs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring and Managing Jobs Monitoring and Managing Jobs Commonly Used Commands Action How to do it Comment Get a summary of all batch jobs sgeusers Shows a tally of all jobs for...

130

Online circuit breaker monitoring system  

E-Print Network [OSTI]

inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could...

Djekic, Zarko

2008-10-10T23:59:59.000Z

131

Online circuit breaker monitoring system  

E-Print Network [OSTI]

inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could...

Djekic, Zarko

2009-05-15T23:59:59.000Z

132

Execution Monitoring in MT Icon  

Science Journals Connector (OSTI)

MT Icon allows the execution of multiple Icon programs in almost any configuration, including execution ... monitoring. As motivated in Chapter 4, MT Icon characterizes monitoring as a special case of ... languag...

Clinton L. Jeffery

1999-01-01T23:59:59.000Z

133

Antineutrino Detection for Nuclear Monitoring  

E-Print Network [OSTI]

covertly acquire these special nuclear materials from: Assembled weapons Raw uranium ore Enriched uranium antineutrino monitoring infrastructure will help avert the spread of covert nuclear reactors and weaponsAntineutrino Detection for Nuclear Monitoring Draft #12;Graphic courtesy Lawrence Livermore

Mcdonough, William F.

134

Environmental Groundwater Monitoring Report  

Office of Legacy Management (LM)

-460 -460 Environmental Groundwater Monitoring Report Third Quarter, 1997 October 1997 Approved for public release; further dissemination unlimited. Environmental Restoration U.S. Department of Energy Nevada Operations Office This report has been reproduced directly from the best available copy. 1 - I : ~vailablk to DOE and DOE contractors from the. Office of Scientific - and Technical .Information, P.O. Box 62, Oak Ridge, TN 3783 1 ; prices available from (423) 576-840 1. Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22 16 1, telephone (703) 487-4650. RULISON SITE GROUNDWATER MONITORING REPORT THIRD QUARTER, 1997 DOE Nevada Operations Office Las Vegas, Nevada

135

Geothermal progress monitor  

SciTech Connect (OSTI)

The Geothermal Progress Monitor is sponsored by the Division of Geothermal Energy/Resource Applications, DOE, to assemble the important facts about geothermal development activities in the United States in order to assess the pace of the development of this alternative energy source. The initial emphasis for the monitoring effort has been placed on the detection and analysis of important and simple indicators of what the main participants in geothermal energy utilization - field developers, energy users, and governments - are doing to foster the discovery, confirmation, and especially the use of this resource. The major indicators currently considered to be both important and measurable, are leasing activites, drilling effort, feasibility studies, construction plans and progress, costs of installations, levels of investment, environmental study and regulatory and legislative status of events, and government monetary investments in projects and activities. Additional indicators may be pursued in the future, depending on specific needs for or opportunities to capture relevant data and facts.

Lopez, A.F.; Entingh, D.J.; Neham, E.A.

1980-09-01T23:59:59.000Z

136

Corrosion Monitoring System  

SciTech Connect (OSTI)

The Corrosion Monitoring System (CMS) program developed and demonstrated a continuously on-line system that provides real-time corrosion information. The program focused on detecting pitting corrosion in its early stages. A new invention called the Intelligent Ultrasonic Probe (IUP) was patented on the program. The IUP uses ultrasonic guided waves to detect small defects and a Synthetic Aperture Focusing Technique (SAFT) algorithm to provide an image of the pits. Testing of the CMS demonstrated the capability to detect pits with dimensionality in the sub-millimeter range. The CMS was tested in both the laboratory and in a pulp and paper industrial plant. The system is capable of monitoring the plant from a remote location using the internet.

Dr. Russ Braunling

2004-10-31T23:59:59.000Z

137

Well Monitoring Systems for EGS  

Broader source: Energy.gov [DOE]

Well Monitoring Systems for EGS presentation at the April 2013 peer review meeting held in Denver, Colorado.

138

1984 environmental monitoring report  

SciTech Connect (OSTI)

The environmental monitoring program has been designed to ensure that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. A listing, as required by DOE Order 5484.1 of BNL facilities, of environmental agencies and permits is provided in the Environmental Program Information Section 3.0, Table B. Since the aquifer underlying Long Island has been designated a ''sole source'' aquifer, the Environmental Protection Agency (EPA) Drinking Water Standards have been used in the assessment of ground water data. However, the limits prescribed in the regulations are not directly applicable to the monitoring well data since (1) the standards apply to a community water supply system, i.e., one serving more than 25 individuals, and (2) the standards represent an annual average concentration. Since the monitoring wells are not components of the Laboratory's water supply system, the EPA drinking water standards are employed as reference criteria to which the surveillance well data is compared. The standards also serve as guidance levels for any appropriate remedial action. 36 refs., 9 figs., 40 tabs.

Day, L.E.; Miltenberger, R.P.; Naidu, J.R. (eds.)

1985-04-01T23:59:59.000Z

139

Carbon Storage Monitoring, Verification and Accounting Research...  

Energy Savers [EERE]

Monitoring, Verification and Accounting Research Carbon Storage Monitoring, Verification and Accounting Research Reliable and cost-effective monitoring, verification and accounting...

140

Portal monitoring technology control process  

SciTech Connect (OSTI)

Portal monitors are an important part of the material protection, control, and accounting (MPC and A) programs in Russia and the US. Although portal monitors are only a part of an integrated MPC and A system, they are an effective means of controlling the unauthorized movement of special nuclear material (SNM). Russian technical experts have gained experience in the use of SNM portal monitors from US experts ad this has allowed them to use the monitors more effectively. Several Russian institutes and companies are designing and manufacturing SNM portal monitors in Russia. Interactions between Russian and US experts have resulted in improvements to the instruments. SNM portal monitor technology has been effectively transferred from the US to Russia and should be a permanent part of the Russian MPC and A Program. Progress in the implementation of the monitors and improvements to how they are used are discussed.

York, R.L.

1998-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Milliwave melter monitoring system  

DOE Patents [OSTI]

A milliwave melter monitoring system is presented that has a waveguide with a portion capable of contacting a molten material in a melter for use in measuring one or more properties of the molten material in a furnace under extreme environments. A receiver is configured for use in obtaining signals from the melt/material transmitted to appropriate electronics through the waveguide. The receiver is configured for receiving signals from the waveguide when contacting the molten material for use in determining the viscosity of the molten material. Other embodiments exist in which the temperature, emissivity, viscosity and other properties of the molten material are measured.

Daniel, William E. (North Augusta, SC); Woskov, Paul P. (Bedford, MA); Sundaram, Shanmugavelayutham K. (Richland, WA)

2011-08-16T23:59:59.000Z

142

Monitoring of tritium  

DOE Patents [OSTI]

The fluid from a breeder nuclear reactor, which may be the sodium cooling fluid or the helium reactor-cover-gas, or the helium coolant of a gas-cooled reactor passes over the portion of the enclosure of a gaseous discharge device which is permeable to hydrogen and its isotopes. The tritium diffused into the discharge device is radioactive producing beta rays which ionize the gas (argon) in the discharge device. The tritium is monitored by measuring the ionization current produced when the sodium phase and the gas phase of the hydrogen isotopes within the enclosure are in equilibrium.

Corbett, James A. (Turtle Creek, PA); Meacham, Sterling A. (Greensburg, PA)

1981-01-01T23:59:59.000Z

143

Lithium niobate explosion monitor  

DOE Patents [OSTI]

Monitoring explosive devices is accomplished with a substantially z-cut lithium niobate crystal in abutment with the explosive device. Upon impact by a shock wave from detonation of the explosive device, the crystal emits a current pulse prior to destruction of the crystal. The current pulse is detected by a current viewing transformer and recorded as a function of time in nanoseconds. In order to self-check the crystal, the crystal has a chromium film resistor deposited thereon which may be heated by a current pulse prior to detonation. This generates a charge which is detected by a charge amplifier. 8 figs.

Bundy, C.H.; Graham, R.A.; Kuehn, S.F.; Precit, R.R.; Rogers, M.S.

1990-01-09T23:59:59.000Z

144

Lithium niobate explosion monitor  

DOE Patents [OSTI]

Monitoring explosive devices is accomplished with a substantially z-cut lithium niobate crystal in abutment with the explosive device. Upon impact by a shock wave from detonation of the explosive device, the crystal emits a current pulse prior to destruction of the crystal. The current pulse is detected by a current viewing transformer and recorded as a function of time in nanoseconds. In order to self-check the crystal, the crystal has a chromium film resistor deposited thereon which may be heated by a current pulse prior to detonation. This generates a charge which is detected by a charge amplifier.

Bundy, Charles H. (Clearwater, FL); Graham, Robert A. (Los Lunas, NM); Kuehn, Stephen F. (Albuquerque, NM); Precit, Richard R. (Albuquerque, NM); Rogers, Michael S. (Albuquerque, NM)

1990-01-01T23:59:59.000Z

145

Cat Heart Rate Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cat Heart Rate Monitoring Cat Heart Rate Monitoring Name: Shakti Status: student Grade: 9-12 Location: TX Country: USA Date: Summer 2010 Question: What is the best way to find a cat's heart rate using a stethoscope? Because I have tried to hear their heart beat but their purring is all I can hear. If I shouldn't use a stethoscope, then what should I use? Replies: Hi Shakti! If you want to use a stethoscope, the trick is to get your cat to stop purring. Two good ways that I have found to help stop the purring 1. Cover their nose (generally cats don't like this and will stop purring) or 2. Put on the tap to drip or lightly stream water (also, they generally don't like this and will stop purring). Alternatively, you can get their heart rate from feeling their pulse. A good place to try to feel a pulse is right where the leg attaches to the abdomen - in an area called the inguinal region. Now granted there are some heart conditions that will cause an animals pulse and their heart rates don't match up, and it's hard to feel if you have a fat cat, but it's a good place to try if you are really trying to get a heart rate in a healthy kitty!

146

Monitoring refrigeration energy useage.  

SciTech Connect (OSTI)

Refrigerators use more energy than any other kitchen appliance -- an unsurprising fact considering that refrigerators operate 24 hours a day, 365 days a year to keep food at a safe temperature. In many low-income households, refrigerators eat up more than half the electricity consumed in one year. And if the refrigerator in a family's home is functioning poorly, the cost to the consumer can be enormous. Discovering whether an existing refrigerator is operating inefficiently enough to warrant replacing it is an extremely difficult task for a resident who sees only a monthly electric bill. Only by knowing the approximate usage of the existing unit can anyone tell whether it would pay to buy a new, energy-efficient refrigerator. The savings from replacing older refrigerators can be substantial, and collecting the data needed to determine when refrigerators should be replaced is easier and less costly than one might think. In both Chicago and New York City, replacing existing units cut refrigerator electricity usage by more than 50%. Monitoring to develop an average usage for the existing stock of refrigerators is a task that can be completed by maintenance staff in a reasonably short time -- and identifying poorly performing units that should be immediately replaced can take just two hours of monitoring.

Cavallo, J.; Mapp, J.; Energy Systems; Wisconsin Energy Bureau

2000-05-01T23:59:59.000Z

147

United States Environmental Monitoring EPA  

Office of Legacy Management (LM)

United United States Environmental Monitoring EPA 600/R-93/141 Environmental Protection Systems Laboratory January 1992 Agency P.O. Box 93478 Las Vegas NV 89193-3478 Research and Development _EPA Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1991 Available to DOE and DOE contractors from the Office of Scientificand Technical Information, P.O. Box 62, Oak ridge,TN 39831; pricesavailablefrom (615) 576-8401 Availableto the publicfrom the NationalTechnicalInformationService, U.S. Departmentof Commerce, 5285 Port Royal Road, Springfield, VA 22161 Price Code: PrintedCopyof MicroficheA01 Frontand back cover: CommunityMonitorStation (front) and Whole BodyLaboratory(back), Craig A. Tsosle EnvironmentalMonitoringSystemsLaboratory-LasVegas, Nevada Offsite Environmental Monitoring Report:

148

An optimized international vehicle monitor  

SciTech Connect (OSTI)

The security plans for many DOE facilities require the monitoring of pedestrians and vehicles to control the movement of special nuclear material (SNM). Vehicle monitors often provide the outer-most barrier against the theft of SNM. Automatic monitors determine the presence of SNM by comparing the gamma-ray and neutron intensity while occupied, to the continuously updated background radiation level which is measured while the unit is unoccupied. The most important factors in choosing automatic vehicle monitors are sensitivity, cost and in high traffic applications total monitoring time. The two types of automatic vehicle monitors presently in use are the vehicle monitoring station and the drive-through vehicle monitor. These two types have dramatically different cost and sensitivities. The vehicle monitoring station has a worst-case detection sensitivity of 40 g of highly enriched uranium, HEU, and a cost approximately $180k. This type of monitor is very difficult to install and can only be used in low traffic flow locations. The drive-through vehicle portal has a worst-case detection sensitivity of 1 kg of HEU and a cost approximately $20k. The world`s political situation has created a pressing need to prevent the diversion of SNM from FSU nuclear facilities and across international borders. Drive-through vehicle monitors would be an effective and practical nuclear material proliferation deterrent if their sensitivity can be improved to a sufficient level. The goal of this project is to evaluate different detector configurations as a means of improving the sensitivity of these instruments to achieve a vehicle monitor that is economical, practical to install, and has adequate sensitivity to be an effective barrier to illegal transportation of SNM.

York, R.L.; Close, D.A.; Fehlau, P.E.

1997-03-01T23:59:59.000Z

149

Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project  

SciTech Connect (OSTI)

Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently.

Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

2000-10-18T23:59:59.000Z

150

Well Monitoring System for EGS  

Broader source: Energy.gov [DOE]

EGS well monitoring tools offer a unique set of solutions which will lower costs and increase confidence in future geothermal projects.

151

Monitoring SERC Technologies Solar Photovoltaics  

Broader source: Energy.gov [DOE]

A webinar by National Renewable Energy Laboratory's Market Transformation Center electrical engineer Peter McNutt about Solar Photovoltaics and how to properly monitor its installation.

152

Future Applications Monitor Critical Structures  

E-Print Network [OSTI]

Future Applications · Monitor Critical Structures ­ Bridges, dams, pipelines, power integrity for rescue efforts ­ Expendable for unstable conditions ­ Power system repair ­ Firefighting

Huston, Dryver R.

153

Radiological Monitoring Continues at WIPP  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Monitoring and Research Center (CEMRC) found some trace amounts of americium and plutonium from a sampling station located on the WIPP access road. This is...

154

Monitoring and Mitigation of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mitigation of Mitigation of Sustained Localized Pitting Corrosion FINAL REPORT DOE FEW 49297 YuPo J. Lin, Edward J. St.Martin, and James R. Frank Argonne National Laboratory Argonne, IL 60439 January 2003 Argonne National Laboratory 9700 S. Cass Avenue Argonne, IL 60439 Monitoring and Mitigation of Sustained Localized Pitting Corrosion Submitted to: Nancy C. Comstock U.S. Department of Energy (DOE) National Petroleum Technology Office By: YuPo J. Lin, Edward J. St.Martin, and James R. Frank Argonne National Laboratory Argonne, IL 60439 January 2003 The submitted manuscript has been created by the University of Chicago as Operator of Argonne National Laboratory ("Argonne") under Contract No. W-31-109-Eng-38 with the U.S. Department of Energy. The U.S. Government retains for itself, and others acting on

155

Audible radiation monitor  

SciTech Connect (OSTI)

This invention consists of a method and apparatus for monitoring ionizing radiation comprising radiation detectors in electrical connection with an isotopic analyzer and a device for producing chords to which each isotope is mapped so that the device produces a unique chord for each isotope. Preferably the chords are pleasing to the ear, except for chords representing unexpected isotopes, and are louder or softer depending on the level of radioactivity produced by each isotope, and musical instrument voices may be simulated in producing the chords as an aid to distinguishing similar-sounding chords. Because of the representation by chords, information regarding the level and composition of the radiation in an area can be conveyed to workers in that area more effectively and yet without distracting them.

Odell, D.M.C.

1992-12-31T23:59:59.000Z

156

Cylinder monitoring program  

SciTech Connect (OSTI)

Cylinders containing depleted uranium hexafluoride (UF{sub 6}) in storage at the Department of Energy (DOE) gaseous diffusion plants, managed by Martin Marietta Energy Systems, Inc., are being evaluated to determine their expected storage life. Cylinders evaluated recently have been in storage service for 30 to 40 years. In the present environment, the remaining life for these storage cylinders is estimated to be 30 years or greater. The group of cylinders involved in recent tests will continue to be monitored on a periodic basis, and other storage cylinders will be observed as on a statistical sample population. The program has been extended to all types of large capacity UF{sub 6} cylinders.

Alderson, J.H. [Martin Marietta Energy Systems, Inc., Paducah, KY (United States)

1991-12-31T23:59:59.000Z

157

Digital ac monitor  

DOE Patents [OSTI]

An apparatus and method is provided for monitoring a plurality of analog ac circuits by sampling the voltage and current waveform in each circuit at predetermined intervals, converting the analog current and voltage samples to digital format, storing the digitized current and voltage samples and using the stored digitized current and voltage samples to calculate a variety of electrical parameters; some of which are derived from the stored samples. The non-derived quantities are repeatedly calculated and stored over many separate cycles then averaged. The derived quantities are then calculated at the end of an averaging period. This produces a more accurate reading, especially when averaging over a period in which the power varies over a wide dynamic range. Frequency is measured by timing three cycles of the voltage waveform using the upward zero crossover point as a starting point for a digital timer. 24 figs.

Hart, G.W.; Kern, E.C. Jr.

1987-06-09T23:59:59.000Z

158

Successes in School Energy Management - Energy Monitoring  

E-Print Network [OSTI]

Successes in School Energy Management ? Energy Monitoring Chad Corbitt, CEM, ATEM Energy Manager, Klein ISD jcorbitt1@kleinisd.net Wednesday, October 10, 2012 Keys to Energy Monitoring ? Develop an Energy Monitoring plan ? Define... the why, what, how and who of the plan ? Implement the Energy Monitoring plan ? Personnel, data system, reporting ? One Experience in Energy Monitoring Developing an Energy Monitoring Plan ? Why do we need to monitor energy? ? What information...

Corbitt, C.

2012-01-01T23:59:59.000Z

159

INSTITUTIONAL ARRANGEMENTS FOR ENVIRONMENTAL MONITORING  

E-Print Network [OSTI]

participation processes to the circumstances, of investing considerable time in designing a fair and integrated in the design of institutional arrangements for monitoring. It stresses the importance of tailoring the challenges encountered would be beneficial to guide future monitoring initiatives. #12;iv A mis padres

160

Climate Analysis, Monitoring, and Modeling  

E-Print Network [OSTI]

and hydrological monitoring stations, and improving the projections on future climate change. Climate change. This project continues the state's climate monitoring and analysis program. Project Description in climate projections for the 21st century. · Provide analyses and interpretation of regional climate

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ORISE: Media Analysis and Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Media Analysis and Monitoring Media Analysis and Monitoring The Oak Ridge Institute for Science and Education (ORISE) uses comprehensive media analysis and monitoring tools to define media interest and the public's perceptions of a particular issue. ORISE's media analysis process includes analyzing news reports combined with media outlet data, such as circulation, readership, number of viewers and listeners; recording frequency of publication and collecting quotes from subject matter experts. To improve the overall consistency and efficiency of the process, ORISE employs tools, such as AutoINFORM (Auto Immunization News FOR Managers), that enable the monitoring of social media, email and other Web content. On average, ORISE tracks, codes and analyzes more than 17,000 articles daily, monitoring 1,400+ news resources and 1,000+ blogs. Annually, the

162

NETL: Ambient Monitoring - Southern Fine Particulate Monitoring Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Southern Fine Particulate Monitoring Project (SRI) Southern Fine Particulate Monitoring Project (SRI) Southern Research Institute (SRI), Birmingham, AL, is operating a research station in North Birmingham for monitoring fine particulate matter (PM2.5) that exists in that part of the Deep South. The station will be a core PM2.5 mass monitoring and chemical speciation station in the nationwide EPA PM2.5 network. As such, it will be a complement and supplement to DOE-NETL's other ongoing projects for monitoring fine particulate matter in the upper Ohio River valley. Locating additional monitoring equipment in the Deep South will fill an important gap in the national particulate monitoring effort. The region's topography, weather patterns, and variety of emission sources may affect the chemical make-up and airborne transport of fine particles in ways that are different than in other parts of the country. The project's results will support DOE's comprehensive program to evaluate ambient fine particulate matter through better understanding of the chemical and physical properties of these materials.

163

HOTLink rack monitor  

SciTech Connect (OSTI)

A remote data acquisition chassis, called a HOTLink Rack Monitor, HRM, has been developed for use in the Fermilab control system. This chassis provides for 64 analog input channels, 8 analog output channels, and 8 bytes of digital I/O. The interface to the host VMEbus crate is by way of a 320 MHz HOTLink serial connection to a PMC mezzanine module. With no processor intervention, all data sources in the remote chassis are read at 100 sec intervals, time stamped, and stored in a 2 MB circular buffer on the PMC module. In operation, the memory always contains the most recent 16 k samples of 10 kHz data from all 64 analog input channels. An expansion module that resides in the HRM chassis records snapshot data for 8 analog channels, each channel consisting of up to 16 k readings, digitized at rates up to 10 MHz. Snapshot data is also returned and stored in buffers on the PMC module. Because the HRM presents a memory-mapped interface to the host, it is independent of the operating system and may be used in any system that supports PMC mezzanine modules.

Al R Franck et al.

2001-12-03T23:59:59.000Z

164

Vapor spill pipe monitor  

DOE Patents [OSTI]

The invention is a method and apparatus for continually monitoring the composition of liquefied natural gas flowing from a spill pipe during a spill test by continually removing a sample of the LNG by means of a probe, gasifying the LNG in the probe, and sending the vaporized LNG to a remote ir gas detector for analysis. The probe comprises three spaced concentric tubes surrounded by a water jacket which communicates with a flow channel defined between the inner and middle, and middle and outer tubes. The inner tube is connected to a pump for providing suction, and the probe is positioned in the LNG flow below the spill pipe with the tip oriented partly downward so that LNG is continuously drawn into the inner tube through a small orifice. The probe is made of a high thermal conductivity metal. Hot water is flowed through the water jacket and through the flow channel between the three tubes to provide the necessary heat transfer to flash vaporize the LNG passing through the inner channel of the probe. The gasified LNG is transported through a connected hose or tubing extending from the probe to a remote ir sensor which measures the gas composition.

Bianchini, G.M.; McRae, T.G.

1983-06-23T23:59:59.000Z

165

Optical oxygen concentration monitor  

DOE Patents [OSTI]

A system for measuring and monitoring the concentration of oxygen uses as a light source an argon discharge lamp, which inherently emits light with a spectral line that is close to one of oxygen`s A-band absorption lines. In a preferred embodiment, the argon line is split into sets of components of shorter and longer wavelengths by a magnetic field of approximately 2,000 Gauss that is parallel to the light propagation from the lamp. The longer wavelength components are centered on an absorption line of oxygen and thus readily absorbed, and the shorter wavelength components are moved away from that line and minimally absorbed. A polarization modulator alternately selects the set of the longer wavelength, or upshifted, components or the set of the shorter wavelength, or downshifted, components and passes the selected set to an environment of interest. After transmission over a path through that environment, the transmitted optical flux of the argon line varies as a result of the differential absorption. The system then determines the concentration of oxygen in the environment based on the changes in the transmitted optical flux between the two sets of components. In alternative embodiments modulation is achieved by selectively reversing the polarity of the magnetic field or by selectively supplying the magnetic field to either the emitting plasma of the lamp or the environment of interest. 4 figs.

Kebabian, P.

1997-07-22T23:59:59.000Z

166

Optical oxygen concentration monitor  

DOE Patents [OSTI]

A system for measuring and monitoring the concentration of oxygen uses as a light source an argon discharge lamp, which inherently emits light with a spectral line that is close to one of oxygen's A-band absorption lines. In a preferred embodiment, the argon line is split into sets of components of shorter and longer wavelengths by a magnetic field of approximately 2000 Gauss that is parallel to the light propagation from the lamp. The longer wavelength components are centered on an absorption line of oxygen and thus readily absorbed, and the shorter wavelength components are moved away from that line and minimally absorbed. A polarization modulator alternately selects the set of the longer wavelength, or upshifted, components or the set of the shorter wavelength, or downshifted, components and passes the selected set to an environment of interest. After transmission over a path through that environment, the transmitted optical flux of the argon line varies as a result of the differential absorption. The system then determines the concentration of oxygen in the environment based on the changes in the transmitted optical flux between the two sets of components. In alternative embodiments modulation is achieved by selectively reversing the polarity of the magnetic field or by selectively supplying the magnetic field to either the emitting plasma of the lamp or the environment of interest.

Kebabian, Paul (Acton, MA)

1997-01-01T23:59:59.000Z

167

Fatigue monitoring desktop guide  

SciTech Connect (OSTI)

The development of a program for managing material aging (MMG) in the nuclear industry requires a new and different perspective. The classical method for MMG is cycle counting, which has been shown to have limited success. The classical method has been successful in satisfying the ductile condition per the America Society of Mechanical Engineers' (ASME) design criteria. However, the defined material failure mechanism has transformed from through-wall cracking and leakage (ASME) to crack initiation (NUREG-6909). This transformation is based on current industry experience with material degradation early in plant life and can be attributed to fabrication issues and environment concerns where cycle counting has been unsuccessful. This new perspective provides a different approach to cycle counting that incorporates all of the information about the material conditions. This approach goes beyond the consideration of a static analysis and includes a dynamic assessment of component health, which is required for operating plants. This health definition should consider fabrication, inspections, transient conditions and industry operating experience. In addition, this collection of information can be transparent to a broader audience that may not have a full understanding of the system design or the potential causes of early material degradation. This paper will present the key points that are needed for a successful fatigue monitoring desktop guide. (authors)

Woods, K. [InnoTech Engineering Solutions, LLC (United States); Thomas, K. [Nebraska Public Power District (United States)

2012-07-01T23:59:59.000Z

168

Essential Grid Workflow Monitoring Elements  

SciTech Connect (OSTI)

Troubleshooting Grid workflows is difficult. A typicalworkflow involves a large number of components networks, middleware,hosts, etc. that can fail. Even when monitoring data from all thesecomponents is accessible, it is hard to tell whether failures andanomalies in these components are related toa given workflow. For theGrid to be truly usable, much of this uncertainty must be elim- inated.We propose two new Grid monitoring elements, Grid workflow identifiersand consistent component lifecycle events, that will make Gridtroubleshooting easier, and thus make Grids more usable, by simplifyingthe correlation of Grid monitoring data with a particular Gridworkflow.

Gunter, Daniel K.; Jackson, Keith R.; Konerding, David E.; Lee,Jason R.; Tierney, Brian L.

2005-07-01T23:59:59.000Z

169

Gap and stripline combined monitor  

DOE Patents [OSTI]

A combined gap and stripline monitor device for measuring the intensity and position of a charged particle beam bunch in a beam pipe of a synchrotron radiation facility is disclosed. The monitor has first and second beam pipe portions with an axial gap therebetween. An outer pipe cooperates with the first beam pipe portion to form a gap enclosure, while inner strips cooperate with the first beam pipe portion to form a stripline monitor, with the stripline length being the same as the gap enclosure length. 4 figs.

Yin, Y.

1986-08-19T23:59:59.000Z

170

Smooth Brome Monitoring at Rocky Flats-2005 Results | Department...  

Energy Savers [EERE]

Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring at Rocky Flats-2005 Results Smooth Brome Monitoring...

171

Monitoring Plan for Weatherization Assistance Program, State...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Monitoring Plan for Weatherization Assistance...

172

Sandia National Laboratories: Better Monitoring and Diagnostics...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ClimateECEnergyRenewable EnergyBiofuelsBetter Monitoring and Diagnostics Tackle Algae Biofuel Pond Crash Problem Better Monitoring and Diagnostics Tackle Algae Biofuel Pond Crash...

173

monitoring data | OpenEI  

Open Energy Info (EERE)

monitoring data monitoring data Dataset Summary Description Freedom Field is a not-for-profit organization formed to facilitate development and commercialization of renewable energy solutions. The organization has installed a variety of renewable energy generating technologies at their facility (located at Rock River Water Reclamation in Rockford, IL), with the intention of serving as a demonstration facility. The facility monitors data (at 5-minute intervals) from a weather station, 12.4 kW of PV panels (56 220-watt panels), a 10kW wind turbine (HAWT), a 1.2 kW wind turbine (VAWT), an absorption cooling system, and biogas burners. Source Freedom Field Date Released July 19th, 2011 (3 years ago) Date Updated Unknown Keywords biogas monitoring data PV radiance solar temperature

174

Integrated global background monitoring network  

SciTech Connect (OSTI)

This paper describes the background and elucidates the need for an integrated global background monitoring network. This network should: establish reference levels for pollutants that have potential for global contaminatin, serve as an early warning site for detecting global spread of pollutants, and establish baseline levels for selected ecosystem parameters against which data from more impacted areas can be compared. This paper proposes the following: (1) establish an integrated global background monitoring network for pollutants and ecosystem parameters; (2) pollutant measurements be multi-media; (3) carry out ecosystem parameter studies in conjunction with pollutant measurements; (4) the network be maintained for an indefinite period of time; (5) the network be established using the international biosphere reserve system as the universe from which a subset of monitoring sites are drawn; and (6) that the project be under the overall direction of the Global Environmental Monitoring System. 43 references, 1 figure, 1 table.

Wiersma, G.B.

1984-08-01T23:59:59.000Z

175

New technologies for item monitoring  

SciTech Connect (OSTI)

This report responds to the Department of Energy`s request that Sandia National Laboratories compare existing technologies against several advanced technologies as they apply to DOE needs to monitor the movement of material, weapons, or personnel for safety and security programs. The authors describe several material control systems, discuss their technologies, suggest possible applications, discuss assets and limitations, and project costs for each system. The following systems are described: WATCH system (Wireless Alarm Transmission of Container Handling); Tag system (an electrostatic proximity sensor); PANTRAK system (Personnel And Material Tracking); VRIS (Vault Remote Inventory System); VSIS (Vault Safety and Inventory System); AIMS (Authenticated Item Monitoring System); EIVS (Experimental Inventory Verification System); Metrox system (canister monitoring system); TCATS (Target Cueing And Tracking System); LGVSS (Light Grid Vault Surveillance System); CSS (Container Safeguards System); SAMMS (Security Alarm and Material Monitoring System); FOIDS (Fiber Optic Intelligence & Detection System); GRADS (Graded Radiation Detection System); and PINPAL (Physical Inventory Pallet).

Abbott, J.A. [EG & G Energy Measurements, Albuquerque, NM (United States); Waddoups, I.G. [Sandia National Labs., Albuquerque, NM (United States)

1993-12-01T23:59:59.000Z

176

Disk Roughness and Defect Monitoring  

Science Journals Connector (OSTI)

Disk surface monitoring and certification refer to the testing and certification of a disk surface in terms of roughness and defect ... as well as the capability to accommodate a flying slider. It includes glide ...

Gang Sheng; Jizhong He; Shuanlin Duan

2013-01-01T23:59:59.000Z

177

Texas Rangeland Monitoring: Level Three  

E-Print Network [OSTI]

Rangeland health is the degree to which the integrity of the soil, vegetation, water, air and ecological processes are balanced and sustained. In this leaflet, you will learn techniques for monitoring processes such as nutrient cycling, energy flow...

Hanselka, C. Wayne; Hart, Charles R.; McGinty, Allan

2006-10-09T23:59:59.000Z

178

Solar Power Systems Web Monitoring  

E-Print Network [OSTI]

All over the world the peak demand load is increasing and the load factor is decreasing year-by-year. The fossil fuel is considered insufficient thus solar energy systems are becoming more and more useful, not only in terms of installation but monitoring of these systems is very crucial. Monitoring becomes very important when there are a large number of solar panels. Monitoring would allow early detection if the output falls below required level or one of the solar panel out of 1000 goes down. In this study the target is to monitor and control a developed solar panel by using available internet foundation. This web-enabled software will provide more flexibility over the system such as transmitting data from panel to the host computer and disseminating information to relevant stake holders barring any geographical barrier. The software would be built around web server with dynamic HTML and JAVA, this paper presents the preliminary design of the proposed system.

Kumar, Bimal Aklesh

2011-01-01T23:59:59.000Z

179

Energy Management Programs- Monitoring Performance  

E-Print Network [OSTI]

ENERGY MANAGEMENT PROGRAMS - MONITORING PERFORMANCE Stanley P. Pauls Mustafa D. Shamy Merck & Co., Inc. Rahway, N. J. ABSTRACT of the historical energy consumption records. Energy use standards have been established to Steam Model monitor... energy conservation performance in bulk pharmaceutical plants. The model considers The basic steam model for most industrial process, comfort heating, and fixed loads. operations is made up of the following components: As the oil crisis developed...

Pauls, S. P.; Shamy, M. D.

180

PEM fuel cell monitoring system  

DOE Patents [OSTI]

Method and apparatus for monitoring the performance of H.sub.2 --O.sub.2 PEM fuel cells. Outputs from a cell/stack voltage monitor and a cathode exhaust gas H.sub.2 sensor are corrected for stack operating conditions, and then compared to predetermined levels of acceptability. If certain unacceptable conditions coexist, an operator is alerted and/or corrective measures are automatically undertaken.

Meltser, Mark Alexander (Pittsford, NY); Grot, Stephen Andreas (West Henrietta, NY)

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

PEM fuel cell monitoring system  

DOE Patents [OSTI]

Method and apparatus are disclosed for monitoring the performance of H{sub 2}--O{sub 2} PEM fuel cells. Outputs from a cell/stack voltage monitor and a cathode exhaust gas H{sub 2} sensor are corrected for stack operating conditions, and then compared to predetermined levels of acceptability. If certain unacceptable conditions coexist, an operator is alerted and/or corrective measures are automatically undertaken. 2 figs.

Meltser, M.A.; Grot, S.A.

1998-06-09T23:59:59.000Z

182

DOE - Office of Legacy Management -- Rulison Monitoring  

Office of Legacy Management (LM)

Rulison Monitoring Rulison Monitoring Rulison, Colorado, Site Natural Gas Well Monitoring Results Monitoring Results for Natural Gas Wells Near Project Rulison Third Quarter 2013 Monitoring Results for Natural Gas Wells Near Project Rulison Second Quarter 2013 Monitoring Results Natural Gas Wells Near Project Rulison Fourth Quarter 2012 and First Quarter 2013 Monitoring Results Natural Gas Wells Near Project Rulison Third Quarter 2012. Monitoring Results for Natural Gas Wells Near Project Rulison (2nd quarter 2012) Monitoring Results for Natural Gas Wells Near Project Rulison (1st quarter 2012) Monitoring Results Natural Gas Wells Near Project Rulison (4th quarter 2011) Project Rulison Monitoring Results for Water Vapor in Gas at the Holmes Mesa Compressor Station, Garfield County, Colorado (3rd quarter

183

Monitoring multiple endpoints in prevention trials.  

Science Journals Connector (OSTI)

...the primary hypothesis and a plan for interim monitoring of the...body charged with the interim review of study findings is a group...the formal interim monitoring plan usually involves a sequential...monitoring for the STAR included a plan for the monitoring of the primary...

Joseph P. Costantino

2006-12-01T23:59:59.000Z

184

Puna Geothermal Venture Hydrologic Monitoring Program  

SciTech Connect (OSTI)

This document provides the basis for the Hydrologic Monitoring Program (HMP) for the Puna Geothermal Venture. The HMP is complementary to two additional environmental compliance monitoring programs also being submitted by Puma Geothermal Venture (PGV) for their proposed activities at the site. The other two programs are the Meteorology and Air Quality Monitoring Program (MAQMP) and the Noise Monitoring Program (NMP), being submitted concurrently.

None

1990-04-01T23:59:59.000Z

185

CONMOW: Condition Monitoring for Offshore Wind Farms  

E-Print Network [OSTI]

practice the European project CONMOW (Condition Monitoring for Offshore Wind Farms) was started in November

Edwin Wiggelinkhuizen; Theo Verbruggen; Henk Braam; Luc Rademakers; Miguel Catalin Tipluica; Andrew Maclean; Axel Juhl Christensen; Edwin Becker; Pr?ftechnik Cm Gmbh (d; Dirk Scheffler; Nordex Energy Gmbh (d

186

Practical utilities for monitoring multicast service availability  

Science Journals Connector (OSTI)

Monitoring has become one of the key issues for the successful deployment of IP multicast in the Internet. During the last decade, several tools and systems have been developed to monitor several different characteristics of IP multicast. In this paper, ... Keywords: Multicast availability, Multicast monitoring, Reachability monitoring

Pavan Namburi; Kamil Sarac; Kevin Almeroth

2006-06-01T23:59:59.000Z

187

Grantee Checklist for the Inspection & Monitoring Requirement  

Broader source: Energy.gov [DOE]

This document walks Grantees through the Inspection & Monitoring requirement of the Quality Work Plan.

188

Radiation Exposure Monitoring Systems Data Reporting Guide  

Broader source: Energy.gov [DOE]

Instructions for preparing occupational exposure data for submittal to the Radiation Exposure Monitoring System (REMS) repository.

189

Quality Work Plan Inspection and Monitoring Requirement  

Broader source: Energy.gov [DOE]

Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

190

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2012-08-01T23:59:59.000Z

191

Idaho National Laboratory Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2008-04-01T23:59:59.000Z

192

Shared performance monitor in a multiprocessor system  

DOE Patents [OSTI]

A performance monitoring unit (PMU) and method for monitoring performance of events occurring in a multiprocessor system. The multiprocessor system comprises a plurality of processor devices units, each processor device for generating signals representing occurrences of events in the processor device, and, a single shared counter resource for performance monitoring. The performance monitor unit is shared by all processor cores in the multiprocessor system. The PMU is further programmed to monitor event signals issued from non-processor devices.

Chiu, George; Gara, Alan G; Salapura, Valentina

2014-12-02T23:59:59.000Z

193

INTEC Groundwater Monitoring Report 2006  

SciTech Connect (OSTI)

This report summarizes 2006 perched water and groundwater monitoring activities at the Idaho Nuclear Technology and Engineering Center (INTEC) located at the Idaho National Laboratory (INL). During 2006, groundwater samples were collected from a total of 22 Snake River Plain Aquifer (SRPA) monitoring wells, plus six aquifer wells sampled for the Idaho CERCLA Disposal Facility (ICDF) monitoring program. In addition, perched water samples were collected from 21 perched wells and 19 suction lysimeters. Groundwater and perched water samples were analyzed for a suite of radionuclides and inorganic constituents. Laboratory results in this report are compared to drinking water maximum contaminant levels (MCLs). Such comparison is for reference only and it should be noted that the Operable Unit 3-13 Record of Decision does not require that perched water comply with drinking water standards.

J. R. Forbes

2007-02-01T23:59:59.000Z

194

Relating to monitoring ion sources  

DOE Patents [OSTI]

The apparatus and method provide techniques for monitoring the position on alpha contamination in or on items or locations. The technique is particularly applicable to pipes, conduits and other locations to which access is difficult. The technique uses indirect monitoring of alpha emissions by detecting ions generated by the alpha emissions. The medium containing the ions is moved in a controlled manner frog in proximity with the item or location to the detecting unit and the signals achieved over time are used to generate alpha source position information.

Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM); Bounds, John Alan (Los Alamos, NM)

2002-01-01T23:59:59.000Z

195

An Optimized International Vehicle Monitor  

SciTech Connect (OSTI)

This is the final report of a one-year, Laboratory Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The goal of this project was to evaluate detector configurations to achieve a vehicle monitor that is economical, practical to install, and has adequate sensitivity to be an effective barrier to illegal transportation of special nuclear materials. We designed a new detector configuration that improves the sensitivity of available drive-through vehicle monitors by more than a factor of 5 while not changing the nuisance alarm rate.

York, R.L.; Close, D.A.; Fehlau, P.E.

1999-07-16T23:59:59.000Z

196

Guidelines for Retrofit Performance Monitoring  

E-Print Network [OSTI]

equipment capable of monitoring 12 or more channels and utilizing a variety of different sensors is often required and typically used. Two such data loggers have been used successfully at the Oak Ridge National Laboratory (ORNL) in field monitoring... of this equipment can still be significant, however, ranging from $500 to $1 800. Equipment of this type has not been used by ORNL in field tests. A partial listing of data loggers in this price range can be obtained from the author. TEMPERATURE RECORDING...

Ternes, M. P.

1987-01-01T23:59:59.000Z

197

Operations monitoring concept. Consolidated Fuel Reprocessing Program  

SciTech Connect (OSTI)

Operations monitoring is a safeguards concept which could be applied in future fuel cycle facilities to significantly enhance the effectiveness of an integrated safeguards system. In general, a variety of operations monitoring techniques could be developed for both international and domestic safeguards application. The goal of this presentation is to describe specific examples of operations monitoring techniques as may be applied in a fuel reprocessing facility. The operations monitoring concept involves monitoring certain in-plant equipment, personnel, and materials to detect conditions indicative of the diversion of nuclear material. An operations monitoring subsystem should be designed to monitor operations only to the extent necessary to achieve specified safeguards objectives; there is no intent to monitor all operations in the facility. The objectives of the operations monitoring subsystem include: verification of reported data; detection of undeclared uses of equipment; and alerting the inspector to potential diversion activities. 1 fig.

Kerr, H.T.

1985-01-01T23:59:59.000Z

198

Integrated Global Background Monitoring Network  

SciTech Connect (OSTI)

One of the more significant problems when trying to determine what impact is having on global cycles is not knowing what ''natural'' levels should be for both abiotic (gases, trace elements) and biotic (ecosystem functions) processes. The authors believe that a well designed, coordinated network of baseline stations in remote areas around the world can provide a data base will allow best current estimates to be made of biotic and abiotic baseline conditions. These baseline conditions will then help us make better comparisons with more impacted areas, and thus help us more fully understand the impact man is having on his world. This paper examines the history of background pollution monitoring at the international level, describes current activities in the field of ''integrated'' background monitoring, and proposes criteria for the development of a global network of baseline stations to coordinate background monitoring for the presence, accumulation and behavior of pollutants in remote ecosystems. In this paper, this network is called the Integrated Global Background Monitoring Network.

Wiersma, G.B.; Franklin, J.F.; Kohler, A.; Croze, H.; Boelcke, C.

1986-12-01T23:59:59.000Z

199

Surfactant monitoring by foam generation  

DOE Patents [OSTI]

A device for monitoring the presence or absence of active surfactant or other surface active agents in a solution or flowing stream based on the formation of foam or bubbles is presented. The device detects the formation of foam with a light beam or conductivity measurement. The height or density of the foam can be correlated to the concentration of the active surfactant present.

Mullen, Ken I. (Los Alamos, NM)

1997-01-01T23:59:59.000Z

200

MACHINE MONITORING USING PROBABILITY THRESHOLDS  

E-Print Network [OSTI]

MACHINE MONITORING USING PROBABILITY THRESHOLDS AND SYSTEM OPERATING CHARACTERISTICS Stephen M a discrete-part production machine, with the objective of effectively determining when to shut the machine analysis: a) There is an underlying time interval that characterizes the operation of the machine, most

Pollock, Stephen

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Intelligent Radio Frequency (RF) Monitoring  

E-Print Network [OSTI]

? Intelligent Radio Frequency (RF) Monitoring ? 2009 Armstrong International, Inc. www.armstronginternational.com 2 ?Expect many enjoyable experiences!? David M. Armstrong Present Process Challenges ? Identifying a failure ? Procedure.... Armstrong Steam Trap Challenges ? Identifying a failure ? Manpower ? Location ? Magnitude of failure ? Energy loss ? Loss of heat transfer ? Justification for repair ? ?Speed of Implementation? ? Environmental concerns Manpower Location 4...

Kimbrough, B.

202

Unobtrusive sleep monitoring using smartphones  

Science Journals Connector (OSTI)

How we feel is greatly influenced by how well we sleep. Emerging quantified-self apps and wearable devices allow people to measure and keep track of sleep duration, patterns and quality. However, these approaches are intrusive, placing a burden on the ... Keywords: activity recognition, mHealth, sleep monitoring, smartphone sensing

Zhenyu Chen; Mu Lin; Fanglin Chen; Nicholas D. Lane; Giuseppe Cardone; Rui Wang; Tianxing Li; Yiqiang Chen; Tanzeem Choudhury; Andrew T. Campbell

2013-05-01T23:59:59.000Z

203

Monitored Geologic Repository Operations Monitoring and Control System Description Document  

SciTech Connect (OSTI)

The Monitored Geologic Repository Operations Monitoring and Control System provides supervisory control, monitoring, and selected remote control of primary and secondary repository operations. Primary repository operations consist of both surface and subsurface activities relating to high-level waste receipt, preparation, and emplacement. Secondary repository operations consist of support operations for waste handling and treatment, utilities, subsurface construction, and other selected ancillary activities. Remote control of the subsurface emplacement operations, as well as, repository performance confirmation operations are the direct responsibility of the system. In addition, the system monitors parameters such as radiological data, air quality data, fire detection status, meteorological conditions, unauthorized access, and abnormal operating conditions, to ensure a safe workplace for personnel. Parameters are displayed in a real-time manner to human operators regarding surface and subsurface conditions. The system performs supervisory monitoring and control for both important to safety and non-safety systems. The system provides repository operational information, alarm capability, and human operator response messages during emergency response situations. The system also includes logic control to place equipment, systems, and utilities in a safe operational mode or complete shutdown during emergency response situations. The system initiates alarms and provides operational data to enable appropriate actions at the local level in support of emergency response, radiological protection response, evacuation, and underground rescue. The system provides data communications, data processing, managerial reports, data storage, and data analysis. This system's primary surface and subsurface operator consoles, for both supervisory and remote control activities, will be located in a Central Control Center (CCC) inside one of the surface facility buildings. The system consists of instrument and control equipment and components necessary to provide human operators with sufficient information to monitor and control the operation of the repository in an efficient and safe manner. The system consists of operator consoles and workstations, multiple video display terminals, communications and interfacing equipment, and instrument and control software with customized configuration to meet the needs of the Monitored Geologic Repository (MGR). Process and logic controllers and the associated input/output units of each system interfaced with this system will be configured into Remote Terminal Units (RTU) and located close to the systems to be monitored and controlled. The RTUs are configured to remain operational should communication with CCC operations be lost. The system provides closed circuit television to selectively view systems, operations, and equipment areas and to aid in the operation of mechanical systems. Control and monitoring of site utility systems will be located in the CCC. Site utilities include heating, ventilation, and air conditioning equipment; plant compressed air; plant water; firewater; electrical systems; and inert gases, such as nitrogen, if required. This system interfaces with surface and subsurface systems that either generate output data or require remote control input. The system interfaces with the Site Communications System for bulk storage of operational data, on-site and off-site communication, and a plant-wide public announcement system. The system interfaces with the Safeguards and Security System to provide operational status and emergency alarm indications. The system interfaces with the Site Operation System to provide site wide acquisition of data for analysis and reports, historical information for trends, utility information for plant operation, and to receive operating plans and procedures.

E.F. Loros

2000-06-29T23:59:59.000Z

204

2002 WIPP Environmental Monitoring Plan  

SciTech Connect (OSTI)

DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

Washington TRU Solutions LLC

2002-09-30T23:59:59.000Z

205

Applications guide to pedestrian SNM monitors  

SciTech Connect (OSTI)

The applications guide introduces readers to the pedestrian special nuclear material (SNM) monitors that provide nuclear material control at DOE contractor facilities. It explains the principles of operation, the strong and weak points, and steps for calibration and maintenance of the monitors. Administrators and security specialists will find an overview of pedestrain monitor application and upkeep in Part 1 of the guide and a descriptive catalog of present-day monitors in Part 3. Technically oriented readers will be interested in the more detailed discussion of SNM monitoring physics and SNM monitor design principles found in Part 2. 18 refs., 33 figs., 9 tabs.

Fehlau, P.E.

1986-02-01T23:59:59.000Z

206

An applications guide to vehicle SNM monitors  

SciTech Connect (OSTI)

The applications guide introduces its readers to the vehicle special nuclear material (SNM) monitors that are becoming part of safeguards and security measures for nuclear material control at DOE facilities. Building on the foundation provided by an applications guide to pedestrian SNM monitors published in 1986 and a technical report on vehicle monitoring published in 1982, the guide provides an overview of vehicle monitoring in Part 1, a discussion of technical aspects of vehicle monitoring in Part 2, and a catalog of vehicle SNM monitors available to DOE facilities in Part 3. Vehicle monitor upkeep, calibration, testing, and performance are important topics in Part 1. The short technical discussion in Part 2 is devoted to new developments and unique features of vehicle monitors.

Fehlau, P.E.

1987-03-01T23:59:59.000Z

207

Ormolu : generating runtime monitors from alloy models  

E-Print Network [OSTI]

This thesis presents Ormolu, a runtime monitor used for monitoring distributed systems. Given an Alloy model, Ormolu generates a database schema and translates the constraints of the model to queries over the database. The ...

Reeves, Dwayne Lloyd

2011-01-01T23:59:59.000Z

208

Biomedical System for Monitoring Pressure Ulcer Development  

E-Print Network [OSTI]

OF C ALIFORNIA Los Angeles Biomedical System for MonitoringOF THE D ISSERTATION Biomedical System for Monitoringto the design of a biomedical sys- tem for the monitoring of

Wang, Frank Tinghwa

2013-01-01T23:59:59.000Z

209

Use of sensors in monitoring civil structures  

E-Print Network [OSTI]

This thesis surveys the use of sensors and sensor networks in monitoring civil structures, with particular emphasis on the monitoring of bridges and highways using fiber optic sensors. Following a brief review of the most ...

Daher, Bassam William, 1979-

2004-01-01T23:59:59.000Z

210

Evaluation of continuous glucose monitoring systems  

E-Print Network [OSTI]

There has been much hype in the research and development of continuous glucose monitoring technologies, driven by the enormous and rapidly expanding glucose monitoring market and the large and growing base of diabetes ...

Li, Guang, M. Eng. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

211

ENVIRONMENTAL OVERSIGHT AND MONITORING AGREEMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OVERSIGHT AND MONITORING AGREEMENT OVERSIGHT AND MONITORING AGREEMENT (Agreement in Principle) Between the United States Department of Energy and the State of Idaho 1. This Agreement in Principle (Agreement) is voluntarily entered into by the United States Department of Energy (DOE), under the authority of 42 U.S.C. §71 01 et. seq., and the State of Idaho (State) under the authority of Article IV, Section S of the Idaho Constitution and Idaho Code § 39-10S. DOE's designated lead for purposes of this Agreement is the DOE's Idaho Operations Office (DOE-ID) and DOE's Naval Reactors Idaho Branch Office for Naval Nuclear Propulsion Program matters. The State's designated lead for purposes of this Agreement is the Department of Environmental Quality (DEQ). This Agreement replaces the Environmental Oversight and

212

High flux photon beam monitor  

SciTech Connect (OSTI)

We have designed two photon beam position monitors for use on our x-ray storage ring beam lines. In both designs, a pair of tungsten blades, separated by a pre-determined gap, intercepts a small fraction of the incoming beam. Due to photoemission, an electrical signal is generated which is proportional to the amount of beam intercepted. The thermal load deposited in the blade is transferred by a heat pipe to a heat exchanger outside the vacuum chamber. A prototype monitor with gap adjustment capability was fabricated and tested at a uv beam line. The results show that the generated electrical signal is a good measurement of the photon beam position. In the following sections, design features and test results are discussed.

Mortazavi, P.; Woodle, M.; Rarback, H.; Shu, D.; Howells, M.

1985-01-01T23:59:59.000Z

213

Radio Monitoring Birds of Prey  

Science Journals Connector (OSTI)

Abstract This paper is a consideration of field techniques rather than of equipment design. The first of three parts reviews applications of radio monitoring in bird of prey studies, with suggestions concerning terminology. There has been some radio telemetry of activity and incubation parameters, but most monitoring of raptors has involved radio tracking. This has included location of birds for investigation of movements, ranges, habitat utilization and roost sites, but could also be used for surveillance of what birds were doing. The second section describes techniques used in radio surveillance of a particularly secretive raptor, the goshawk, and presents original data on prey selection which were collected during studies of predation on woodpigeons and pheasants. Finally, there is an outline of how selection data were combined with predation rate measurements and hawk density estimates, obtained using radio tags as a Lincoln Index marker during hawk sightings, to determine the impact of predation on these economically important prey.

R.E. KENWARD

1980-01-01T23:59:59.000Z

214

Building Energy Monitoring and Analysis  

SciTech Connect (OSTI)

This project aimed to develop a standard methodology for building energy data definition, collection, presentation, and analysis; apply the developed methods to a standardized energy monitoring platform, including hardware and software, to collect and analyze building energy use data; and compile offline statistical data and online real-time data in both countries for fully understanding the current status of building energy use. This helps decode the driving forces behind the discrepancy of building energy use between the two countries; identify gaps and deficiencies of current building energy monitoring, data collection, and analysis; and create knowledge and tools to collect and analyze good building energy data to provide valuable and actionable information for key stakeholders.

Hong, Tianzhen; Feng, Wei; Lu, Alison; Xia, Jianjun; Yang, Le; Shen, Qi; Im, Piljae; Bhandari, Mahabir

2013-06-01T23:59:59.000Z

215

Remote Environmental Monitoring System CRADA  

SciTech Connect (OSTI)

The goal of the project was to develop a wireless communications system, including communications, command, and control software, to remotely monitor the environmental state of a process or facility. Proof of performance would be tested and evaluated with a prototype demonstration in a functioning facility. AR Designs' participation provided access to software resources and products that enable network communications for real-time embedded systems to access remote workstation services such as Graphical User Interface (GUI), file I/O, Events, Video, Audio, etc. in a standardized manner. This industrial partner further provided knowledge and links with applications and current industry practices. FM and T's responsibility was primarily in hardware development in areas such as advanced sensors, wireless radios, communication interfaces, and monitoring and analysis of sensor data. This role included a capability to design, fabricate, and test prototypes and to provide a demonstration environment to test a proposed remote sensing system. A summary of technical accomplishments is given.

Hensley, R.D.

2000-03-30T23:59:59.000Z

216

Monitoring variability of multivariate processes  

Science Journals Connector (OSTI)

The paper focuses on determining changes in process variability of multivariate processes. The problem is compounded by the fact that any of the elements in the variance-covariance matrix of variables could change, leading to a change in the process variability. While it may not be feasible to maintain individual control charts for each element of the variance-covariance matrix, some aggregate measure of the variability criteria could be monitored to initially determine if a change has occurred in the process variability. A couple of aggregate measures are proposed and the performance of these suggested measures is explored through a simulation procedure. Compared to the traditional method, which monitors the determinant of the variance-covariance matrix, these alternatives perform well. The performance measure used is the mean time to first detection of a change in the process variability.

Amitava Mitra; Mark Clark

2014-01-01T23:59:59.000Z

217

Refrigeration monitor and alarm system  

SciTech Connect (OSTI)

A monitor is described for a refrigeration system including a heat reclaiming system coupled therewith, comprising: a sensor positioned to detect the level of liquid state refrigerant in the system and provide an electrical output signal therefrom; a digital display for displaying the refrigerant level; first circuit means coupling the digital display to the sensor for actuating the digital display; and lockout means coupled with the sensor for deactivating the heat reclaiming system when a preselected refrigerant level is reached.

Branz, M.A.; Renaud, P.F.

1986-09-23T23:59:59.000Z

218

Timber Mountain Precipitation Monitoring Station  

SciTech Connect (OSTI)

A precipitation monitoring station was placed on the west flank of Timber Mountain during the year 2010. It is located in an isolated highland area near the western border of the Nevada National Security Site (NNSS), south of Pahute Mesa. The cost of the equipment, permitting, and installation was provided by the Environmental Monitoring Systems Initiative (EMSI) project. Data collection, analysis, and maintenance of the station during fiscal year 2011 was funded by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office Environmental Restoration, Soils Activity. The station is located near the western headwaters of Forty Mile Wash on the Nevada Test and Training Range (NTTR). Overland flows from precipitation events that occur in the Timber Mountain high elevation area cross several of the contaminated Soils project CAU (Corrective Action Unit) sites located in the Forty Mile Wash watershed. Rain-on-snow events in the early winter and spring around Timber Mountain have contributed to several significant flow events in Forty Mile Wash. The data from the new precipitation gauge at Timber Mountain will provide important information for determining runoff response to precipitation events in this area of the NNSS. Timber Mountain is also a groundwater recharge area, and estimation of recharge from precipitation was important for the EMSI project in determining groundwater flowpaths and designing effective groundwater monitoring for Yucca Mountain. Recharge estimation additionally provides benefit to the Underground Test Area Sub-project analysis of groundwater flow direction and velocity from nuclear test areas on Pahute Mesa. Additionally, this site provides data that has been used during wild fire events and provided a singular monitoring location of the extreme precipitation events during December 2010 (see data section for more details). This letter report provides a summary of the site location, equipment, and data collected in fiscal year 2011.

Lyles Brad,McCurdy Greg,Chapman Jenny,Miller Julianne

2012-01-01T23:59:59.000Z

219

Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in identifying and locating the source of network problems when they occur, the US ATLAS facility began deploying and configuring perfSONAR-PS in 2008. Our goal was to...

220

Monitoring and Managing PDSF Jobs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring and Managing Jobs Monitoring and Managing Jobs Monitoring and Managing Jobs Action How to do it Comment Get a summary of all batch jobs sgeusers Shows a tally of all jobs for all users including their states. This is a script that parses the output of qstat and is maintained by PDSF staff (located in /common/usg/bin). Do "sgeusers -h" for usage info. Get a listing of your jobs and their states qstat -u user_name If you skip the -u option, you'll get all the jobs on PDSF. qstat_long -u user_name Regular qstat truncates job names to 10 characters. If you need a full name - use qstat_long. Get detailed info about a specific job qstat -j job_ID You can get job_ID by listing your jobs as described above. See how much cputime a job has used qstat -j job_ID Look in the next to the last line or grep the output on "usage". Note that in the memory usage GBs stands for Gigabyte-seconds.

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Transformative monitoring approaches for reprocessing.  

SciTech Connect (OSTI)

The future of reprocessing in the United States is strongly driven by plant economics. With increasing safeguards, security, and safety requirements, future plant monitoring systems must be able to demonstrate more efficient operations while improving the current state of the art. The goal of this work was to design and examine the incorporation of advanced plant monitoring technologies into safeguards systems with attention to the burden on the operator. The technologies examined include micro-fluidic sampling for more rapid analytical measurements and spectroscopy-based techniques for on-line process monitoring. The Separations and Safeguards Performance Model was used to design the layout and test the effect of adding these technologies to reprocessing. The results here show that both technologies fill key gaps in existing materials accountability that provide detection of diversion events that may not be detected in a timely manner in existing plants. The plant architecture and results under diversion scenarios are described. As a tangent to this work, both the AMUSE and SEPHIS solvent extraction codes were examined for integration in the model to improve the reality of diversion scenarios. The AMUSE integration was found to be the most successful and provided useful results. The SEPHIS integration is still a work in progress and may provide an alternative option.

Cipiti, Benjamin B.

2011-09-01T23:59:59.000Z

222

ONTHEINTEGRATIONOFPASSIVEANDACTIVE NETWORK MONITORING IN GRID SYSTEMS  

E-Print Network [OSTI]

activity. Monitoring the network infrastructure of a Grid has a vital role in the man- agementONTHEINTEGRATIONOFPASSIVEANDACTIVE NETWORK MONITORING IN GRID SYSTEMS Sergio Andreozzi, Augusto.trimintzios@enisa.eu.int Abstract This paper focuses on the integration of passive and active network monitoring techniques in Grid

Markatos, Evangelos P.

223

Virtual Machine Monitors 36.1 Introduction  

E-Print Network [OSTI]

36 Virtual Machine Monitors 36.1 Introduction Years ago, IBM sold mainframes to large organizations, and a problem arose: what if the organization wanted to run different operating systems on the machine? (some yet another level of indirection in the form of a virtual machine monitor, or VMM or just monitor

Sheridan, Jennifer

224

Standard hydrogen monitoring system equipment installation instructions  

SciTech Connect (OSTI)

This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

Schneider, T.C.

1996-09-27T23:59:59.000Z

225

DOE - Office of Legacy Management -- Rio_Monitoring  

Office of Legacy Management (LM)

RioMonitoring Rio Blanco, Colorado, Site Natural Gas Well Monitoring Results Project Rio Blanco Monitoring Results Fourth Quarter 2010 Separated Water at a Natural Gas Plant,...

226

Definition: Line Transformer Monitors | Open Energy Information  

Open Energy Info (EERE)

Transformer Monitors Transformer Monitors Jump to: navigation, search Dictionary.png Line Transformer Monitors Transformer Monitoring System can monitor different aspects of transformers, including oil levels and multiple temperatures within the transformer. This allows for analysis of the health of either individual key power transformers or multiple power transformers networked in the system. For example, the transformer monitors provide transformer oil dissolved gas analysis (DGA), oil temperature, ambient temperature, and moisture in oil measurements. These measurements are made in relation to transformer load.[1] Related Terms transformer, system, transformer References ↑ https://www.smartgrid.gov/category/technology/line_transformer_monitors [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like.

227

ORISE: DOE's Radiation Exposure Monitoring System (REMS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring System (REMS) Monitoring System (REMS) ORISE maintains large database of radition exposure records for the U.S. Department of Energy ORISE staff monitoring radiation data for DOE Rule 10 CFR 835 establishes the U.S. Department of Energy's (DOE) occupational protection rule and requires assessment and recording of radiation doses to individuals who are exposed to sources of radiation or contamination. The Radiation Exposure Monitoring System (REMS) database is the radiation exposure data repository for all monitored DOE employees, contractors, subcontractors and members of the public. REMS maintains dose records for all monitored individuals dating back to 1969. Aggregated, site-specific data are available on the Radiation Exposure Monitoring System website for all years since 1986. Currently,

228

Ecological Monitoring and Compliance Program 2009 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the programs activities conducted by National Security Technologies, LLC, during calendar year 2009. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex. During 2009, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

Dennis J. Hansen, David C. Anderson, Derek B. Hall, Paul D. Greger, and W. Kent Ostler

2010-07-13T23:59:59.000Z

229

Ecological Monitoring and Compliance Program 2008 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the programs activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2008. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC).

Dennis J. Hansen, David C. Anderson, Derek B. Hall, Paul D. Greger, W. Kent Ostler

2009-04-30T23:59:59.000Z

230

Ecological Monitoring and Compliance Program 2012 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the programs activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2012. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). During 2012, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

Hall, Derek B.; Anderson, David C.; Greger, Paul D.; Ostler, W. Kent; Hansen, Dennis J.

2013-07-03T23:59:59.000Z

231

Pajarito Monitor: a high-sensitivity monitoring system for highly enriched uranium  

SciTech Connect (OSTI)

The Pajarito Monitor for Special Nuclear Material is a high-sensitivity gamma-ray monitoring system for detecting small quantities of highly enriched uranium transported by pedestrians or motor vehicles. The monitor consists of two components: a walk-through personnel monitor and a vehicle monitor. The personnel monitor has a plastic-scintillator detector portal, a microwave occupancy monitor, and a microprocessor control unit that measures the radiation intensity during background and monitoring periods to detect transient diversion signals. The vehicle monitor examines stationary motor vehicles while the vehicle's occupants pass through the personnel portal to exchange their badges. The vehicle monitor has four groups of large plastic scintillators that scan the vehicle from above and below. Its microprocessor control unit measures separate radiation intensities in each detector group. Vehicle occupancy is sensed by a highway traffic detection system. Each monitor's controller is responsible for detecting diversion as well as serving as a calibration and trouble-shooting aid. Diversion signals are detected by a sequential probability ratio hypothesis test that minimizes the monitoring time in the vehicle monitor and adapts itself well to variations in individual passage speed in the personnel monitor. Designed to be highly sensitive to diverted enriched uranium, the monitoring system also exhibits exceptional sensitivity for plutonium. 6 references, 9 figures, 2 tables.

Fehlau, P.E.; Coop, K.; Garcia, C. Jr.; Martinez, J.

1984-01-01T23:59:59.000Z

232

DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM  

SciTech Connect (OSTI)

The deep hard rock drilling environment induces severe vibrations into the drillstring, which can cause reduced rates of penetration (ROP) and premature failure of the equipment. The only current means of controlling vibration under varying conditions is to change either the rotary speed or the weight-on-bit (WOB). These changes often reduce drilling efficiency. Conventional shock subs are useful in some situations, but often exacerbate the problems. The objective of this project is development of a unique system to monitor and control drilling vibrations in a ''smart'' drilling system. This system has two primary elements: (1) The first is an active vibration damper (AVD) to minimize harmful axial, lateral and torsional vibrations. The hardness of this damper will be continuously adjusted using a robust, fast-acting and reliable unique technology. (2) The second is a real-time system to monitor drillstring vibration, and related parameters. This monitor adjusts the damper according to local conditions. In some configurations, it may also send diagnostic information to the surface via real-time telemetry. The AVD is implemented in a configuration using magnetorheological (MR) fluid. By applying a current to the magnetic coils in the damper, the viscosity of the fluid can be changed rapidly, thereby altering the damping coefficient in response to the measured motion of the tool. Phase I of this program entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype. Phase I of the project was completed by the revised end date of May 31, 2004. The objectives of this phase were met, and all prerequisites for Phase II have been completed.

Martin E. Cobern

2004-08-31T23:59:59.000Z

233

Facility effluent monitoring plan for the 3720 facility  

SciTech Connect (OSTI)

This report describes the effluent monitoring plan for the 3720 facility. Airborne and liquid effluents are monitored.

Ballinger, M.Y.

1994-11-01T23:59:59.000Z

234

Chapter 8 - Automation and Monitoring  

Science Journals Connector (OSTI)

This chapter begins with the topic of process automation which has the intent of making repetitive tasks more consistent, faster, and cheaper. As part of this discussion, we talk about how to determine if a process should be automated, how to document the process in preparation for automation, and how to perform the actual automation. A variety of scripting languages can be used to perform process automation and general best practices for scripting these processes is discussed as well as some thoughts on how to choose the right scripting language for the job. The second part of the chapter is all about monitoring of enterprise applications. Key performance indicators (KPIs) that give insight into the enterprise applications performance over time as well as determining when to alert the enterprise applications administrator to potential problems within the application are discussed. Alerts are another important topic associated with enterprise application monitoring that is discussed including how to properly tune alerts through the selection of appropriate KPIs, retry counts, and retry intervals.

Jeremy Faircloth

2014-01-01T23:59:59.000Z

235

Straddle Carrier Radiation Portal Monitoring  

SciTech Connect (OSTI)

U.S. Customs and Border Protection (CBP) is the primary enforcement agency protecting the nations ports of entry. CBP is enhancing its capability to interdict the illicit import of nuclear and radiological materials and devices that may be used by terrorists. Pacific Northwest National Laboratory (PNNL) is providing scientific and technical support to CBP in their goal to enable rapid deployment of nuclear and radiation detection systems at U. S. ports of entry to monitor 100% of the incoming international traffic and cargo while not adversely impacting the operations or throughput of the ports. The U.S. ports of entry include the following vectors: land border crossings, seaports, airports, rail crossings, and mail and express consignment courier facilities. U.S. Customs and Border Protection (CBP) determined that a screening solution was needed for Seaport cargo containers being transported by Straddle Carriers (straddle carriers). A stationary Radiation Portal Monitor (RPM) for Straddle Carriers (SCRPM) is needed so that cargo containers can be scanned while in transit under a Straddle Carrier. The Straddle Carrier Portal operational impacts were minimized by conducting a time-motion study at the Port, and adaptation of a Remotely Operated RPM (RO-RPM) booth concept that uses logical lighting schemes for traffic control, cameras, Optical Character Recognition, and wireless technology.

Andersen, Eric S.; Samuel, Todd J.; Mullen, O Dennis

2005-08-01T23:59:59.000Z

236

Apparatus for monitoring crystal growth  

DOE Patents [OSTI]

A system and method are disclosed for monitoring the growth of a crystalline body from a liquid meniscus in a furnace. The system provides an improved human/machine interface so as to reduce operator stress, strain and fatigue while improving the conditions for observation and control of the growing process. The system comprises suitable optics for forming an image of the meniscus and body wherein the image is anamorphic so that the entire meniscus can be viewed with good resolution in both the width and height dimensions. The system also comprises a video display for displaying the anamorphic image. The video display includes means for enhancing the contrast between any two contrasting points in the image. The video display also comprises a signal averager for averaging the intensity of at least one preselected portions of the image. The value of the average intensity, can in turn be utilized to control the growth of the body. The system and method are also capable of observing and monitoring multiple processes.

Sachs, Emanual M. (Watertown, MA)

1981-01-01T23:59:59.000Z

237

Method of monitoring crystal growth  

DOE Patents [OSTI]

A system and method are disclosed for monitoring the growth of a crystalline body from a liquid meniscus in a furnace. The system provides an improved human/machine interface so as to reduce operator stress, strain and fatigue while improving the conditions for observation and control of the growing process. The system comprises suitable optics for forming an image of the meniscus and body wherein the image is anamorphic so that the entire meniscus can be viewed with good resolution in both the width and height dimensions. The system also comprises a video display for displaying the anamorphic image. The video display includes means for enhancing the contrast between any two contrasting points in the image. The video display also comprises a signal averager for averaging the intensity of at least one preselected portions of the image. The value of the average intensity, can in turn be utilized to control the growth of the body. The system and method are also capable of observing and monitoring multiple processes.

Sachs, Emanual M. (Watertown, MA)

1982-01-01T23:59:59.000Z

238

Deer monitoring at the Savannah River Site  

SciTech Connect (OSTI)

To protect public health, all deer and feral hogs harvested at the Savannah River Site (SRS) during controlled hunts are monitored for Cs-137. A new monitoring program has been developed by the Environmental Monitoring Section (EMS). To provide increased confidence in dose data and compliance with regulations, many changes have been made to the deer and hog monitoring program. Using field count information, a computerized database determines Cs-137 concentration and calculates the committed effective dose equivalent (CEDE) resulting from consumption of the animal. The database then updates each hunter's cumulative CEDE in real time. Also, enhancements to the instrument calibration and quality control portions of the monitoring program were implemented. These include improved monitor calibration, intercomparison of field results from the same animal using different detectors, and regular use of check sources to verify equipment performance. With these program changes, EMS can produce more accurate and verifiable dose data.

Fledderman, P.D.

1992-01-01T23:59:59.000Z

239

Deer monitoring at the Savannah River Site  

SciTech Connect (OSTI)

To protect public health, all deer and feral hogs harvested at the Savannah River Site (SRS) during controlled hunts are monitored for Cs-137. A new monitoring program has been developed by the Environmental Monitoring Section (EMS). To provide increased confidence in dose data and compliance with regulations, many changes have been made to the deer and hog monitoring program. Using field count information, a computerized database determines Cs-137 concentration and calculates the committed effective dose equivalent (CEDE) resulting from consumption of the animal. The database then updates each hunter`s cumulative CEDE in real time. Also, enhancements to the instrument calibration and quality control portions of the monitoring program were implemented. These include improved monitor calibration, intercomparison of field results from the same animal using different detectors, and regular use of check sources to verify equipment performance. With these program changes, EMS can produce more accurate and verifiable dose data.

Fledderman, P.D.

1992-10-01T23:59:59.000Z

240

Definition: Equipment Condition Monitor | Open Energy Information  

Open Energy Info (EERE)

Condition Monitor Condition Monitor Jump to: navigation, search Dictionary.png Equipment Condition Monitor A monitoring device that automatically measures and communicates equipment characteristics that are related to the "health" and maintenance of the equipment. These characteristics can include, but are not limited to temperature, dissolved gas, and loading. These devices can automatically generate alarm signals if conditions exceed preset thresholds.[1] Related Terms sustainability References ↑ https://www.smartgrid.gov/category/technology/equipment_condition_monitor [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitions|Template:BASEPAGENAME]] Retrieved from "http://en.openei.org/w/index.php?title=Definition:Equipment_Condition_Monitor&oldid=502601"

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Carbon Storage Monitoring, Verification and Accounting Research |  

Broader source: Energy.gov (indexed) [DOE]

Monitoring, Verification and Accounting Research Monitoring, Verification and Accounting Research Carbon Storage Monitoring, Verification and Accounting Research Reliable and cost-effective monitoring, verification and accounting (MVA) techniques are an important part of making geologic sequestration a safe, effective, and acceptable method for greenhouse gas control. MVA of geologic storage sites is expected to serve several purposes, including addressing safety and environmental concerns; inventory verification; project and national accounting of greenhouse gas emissions reductions at geologic storage sites; and evaluating potential regional, national, and international greenhouse gas reduction goals. The goal of our program area is to develop and demonstrate a broad portfolio of technologies, applications, and accounting requirements that

242

FO Bridge Monitoring Activities in China  

Science Journals Connector (OSTI)

In this paper, various types of optical fiber sensors developed for SHM of civil infrastructures are briefly introduced. More than 10 practical bridge monitoring systems are presented....

Ou, Jinping

243

BROOKHAVEN NATIONAL LABORATORY ENVIRONMENTAL MONITORING PLAN  

SciTech Connect (OSTI)

Triennial update that describes the BNL Environmental Monitoring Program for all media (air, surface water, ground water, etc.) in accordance with DOE ORDER 5400.5

DAUM,M.; DORSCH,WM.; FRY,J.; GREEN,T.; LEE,R.; NAIDU,J.; PAQUETTE,D.; SCARPITTA,S.; SCHROEDER,G.

1999-09-22T23:59:59.000Z

244

Recording of SERC Monitoring Technologies- Solar Photovoltaics  

Broader source: Energy.gov [DOE]

This document provides a transcript of the of SERC Monitoring Technologies - Solar Photovoltaics webinar, presented on 10/20/2011 by Peter McNutt.

245

Monitoring Feed Efficiency in Dairy Herds  

E-Print Network [OSTI]

This publication explains how dairy producers can improve feeding and production efficiency by frequently monitoring ration particle size, feed inventory and milk production....

Stokes, Sandra R.

1999-04-26T23:59:59.000Z

246

Spectroradiometric Monitoring of Open Algal Cultures  

Science Journals Connector (OSTI)

The outdoor culturing of green algae is monitored with a dual-channel spectroradiometer. The measured reflectance provides information regarding growth rate and light usage,...

Reichardt, Thomas A; Collins, Aaron M; Timlin, Jerilyn A; McBride, Robert C; Behnke, Craig A

247

Monitoring SERC Technologies Solar Hot Water  

Broader source: Energy.gov [DOE]

A webinar by National Renewable Energy Laboratory analyst Eliza Hotchkiss on Solar Hot Water systems and how to properly monitor their installation.

248

Energy Performance Monitor | Open Energy Information  

Open Energy Info (EERE)

Performance Monitor AgencyCompany Organization: Johnson Controls Sector: Energy User Interface: Website, Mobile Device ComplexityEase of Use: Not Available Website:...

249

Monitoring Ankle Rehabilitation With Wii Fit.  

E-Print Network [OSTI]

?? The purpose of this research was to experimentally examine if the Wii Fit (WF) could be used to monitor progress of a rehabilitation protocol (more)

Laperle, Ryan

2011-01-01T23:59:59.000Z

250

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

Jenifer Nordstrom

2014-02-01T23:59:59.000Z

251

Participatory Carbon Monitoring: Operational Guidance for National...  

Open Energy Info (EERE)

Participatory Carbon Monitoring: Operational Guidance for National REDD+ Carbon Accounting Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Participatory Carbon...

252

Hydrologic Monitoring Summary Long Valley Caldera, California...  

Open Energy Info (EERE)

Caldera, California Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Hydrologic Monitoring Summary Long Valley Caldera, California Abstract Abstract...

253

Laser in situ monitoring of combustion processes  

Science Journals Connector (OSTI)

Several examples of laser in situ monitoring of combustion processes are presented. Using a frequency modulated 13CO2 waveguide laser, in situ concentrations of...

Arnold, A; Becker, H; Hemberger, R; Hentschel, W; Ketterle, W; Kollner, M; Meienburg, W; Monkhouse, P; Neckel, H; Schafer, M; Schindler, K P; Sick, V; Suntz, R; Wolfrum, J

1990-01-01T23:59:59.000Z

254

Sandia's Cooperative Monitoring Center celebrates 20 years |...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the photo: In this 1998 photo, Kent Biringer, manager of International Nuclear Threat Reduction, meets with visiting scholars from Pakistan and India at the Cooperative Monitoring...

255

ICDP Complex Groundwater Monitoring Plan REV 5  

SciTech Connect (OSTI)

This Groundwater Monitoring Plan, along with the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions, constitutes the sampling and analysis plan for groundwater and perched water monitoring at the Idaho CERCLA Disposal Facility (ICDF). A detection monitoring system was installed in the Snake River Plan Aquifer to comply with substantive requirements of "Releases from Solid Waste Management Units" of the Resource Conservation and Recovery Act. This detection monitoring wells constructed in the Snake River Plain Aquifer.

Cahn, L. S.

2007-08-09T23:59:59.000Z

256

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-09-30T23:59:59.000Z

257

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2003-09-30T23:59:59.000Z

258

Delaware Basin Monitoring Annual Report  

SciTech Connect (OSTI)

The Delaware Basin Drilling Surveillance Program (DBDSP) is designed to monitor drilling activities in the vicinity of the Waste Isolation Pilot Plant (WIPP). This program is based on Environmental Protection Agency (EPA) requirements. The EPA environmental standards for the management and disposal of transuranic (TRU) radioactive waste are codified in 40 CFR Part 191 (EPA 1993). Subparts B and C of the standard address the disposal of radioactive waste. The standard requires the Department of Energy (DOE) to demonstrate the expected performance of the disposal system using a probabilistic risk assessment or performance assessment (PA). This PA must show that the expected repository performance will not release radioactive material above limits set by the EPA's standard. This assessment must include the consideration of inadvertent drilling into the repository at some future time.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2005-09-30T23:59:59.000Z

259

Wind Turbine Manufacturing Process Monitoring  

SciTech Connect (OSTI)

To develop a practical inline inspection that could be used in combination with automated composite material placement equipment to economically manufacture high performance and reliable carbon composite wind turbine blade spar caps. The approach technical feasibility and cost benefit will be assessed to provide a solid basis for further development and implementation in the wind turbine industry. The program is focused on the following technology development: (1) Develop in-line monitoring methods, using optical metrology and ultrasound inspection, and perform a demonstration in the lab. This includes development of the approach and performing appropriate demonstration in the lab; (2) Develop methods to predict composite strength reduction due to defects; and (3) Develop process models to predict defects from leading indicators found in the uncured composites.

Waseem Faidi; Chris Nafis; Shatil Sinha; Chandra Yerramalli; Anthony Waas; Suresh Advani; John Gangloff; Pavel Simacek

2012-04-26T23:59:59.000Z

260

Urea biosensor for hemodialysis monitoring  

DOE Patents [OSTI]

An electrochemical sensor capable of detecting and quantifying urea in fluids resulting from hemodialysis procedures. The sensor is based upon measurement of the pH change produced in an aqueous environment by the products of the enzyme-catalyzed hydrolysis of urea. The sensor may be fabricated using methods amenable to mass fabrication, resulting in low-cost sensors and thus providing the potential for disposable use. In a typical application, the sensor could be used in treatment centers, in conjunction with an appropriate electronics/computer system, in order to determine the hemodialysis endpoint. The sensor can also be utilized to allow at-home testing to determine if dialysis was necessary. Such a home monitor is similar, in principle, to devices used for blood glucose testing by diabetics, and would require a blood droplet sample by using a finger prick.

Glass, Robert S. (Livermore, CA)

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

MULTI-POINT RADIATION MONITOR  

SciTech Connect (OSTI)

A unique radiation monitor has been developed for performing wide-area field surveys for radiation sources. This device integrates the real-time output of multiple radiation detectors into a hand-held personal computer (e.g., a PDA) containing an intuitive graphical user interface. An independent hardware module supplies high voltage to the detectors and contains a rapid sampling system for transferring the detector count rates through an interface to the PDA. The imbedded firmware can be changed for various applications using a programmable memory card. As presently configured, the instrument contains a series of Geiger-Mueller (GM) tubes in a flexible detector string. This linear array of multiple sensors can be used by US Coast Guard and Customs container inspection personnel to measure radiation intensity in stacks of transport containers where physical access is impeded.

Hofstetter, K; Donna Beals, D; Ken Odell, K; Robert Eakle, R; Russell Huffman, R; Larry Harpring, L

2006-05-12T23:59:59.000Z

262

Seismic monitoring at The Geysers  

SciTech Connect (OSTI)

During the last several years Lawrence Berkeley Laboratory (LBL) and Lawrence Livermore National Laboratory (LLNL) have been working with industry partners at The Geysers geothermal field to evaluate and develop methods for applying the results of microearthquake (MEQ) monitoring. It is a well know fact that seismicity at The Geysers is a common occurrence, however, there have been many studies and papers written on the origin and significance of the seismicity. The attitude toward MEQ data ranges from being nothing more than an curious artifact of the production activities, to being a critical tool in evaluating the reservoir performance. The purpose of the work undertaken b y LBL and LLNL is to evaluate the utility, as well as the methods and procedures used in of MEQ monitoring, recommend the most cost effective implementation of the methods, and if possible link physical processes and parameters to the generation of MEQ activity. To address the objectives above the MEQ work can be categorized into two types of studies. The first type is the direct analysis of the spatial and temporal distribution of MEQ activity and studying the nature of the source function relative to the physical or chemical processes causing the seismicity. The second broad area of study is imaging the reservoir/geothermal areas with the energy created by the MEQ activity and inferring the physical and/or chemical properties within the zone of imaging. The two types of studies have obvious overlap, and for a complete evaluation and development require high quality data from arrays of multicomponent stations. Much of the effort to date at The Geysers by both DOE and the producers has concentrated establishing a high quality data base. It is only within the last several years that this data base is being fully evaluated for the proper and cost effective use of MEQ activity. Presented here are the results to date of DOE`s effort in the acquisition and analysis of the MEQ data.

Majer, E.L.; Romero, A.; Vasco, D.; Kirkpatrick, A.; Peterson, J.E. [Lawrence Berkeley Lab., CA (United States); Zucca, J.J.; Hutchings, L.J.; Kasameyer, P.W. [Lawrence Livermore National Lab., CA (United States)

1993-04-01T23:59:59.000Z

263

Air Pollution Control Regulations: No. 6- Continuous Emissions Monitors and Opacity Monitors (Rhode Island)  

Broader source: Energy.gov [DOE]

Stationary sources, including fossil fuel fired steam or hot water generating units, may be required to install and operate a continuous emissions monitoring system equipped with an opacity monitor...

264

Application of Inverse Models for Long-Term-Energy-Monitoring in the German Enbau: Monitor Project  

E-Print Network [OSTI]

. a detailed monitoring takes place during the first two years of operation. after this period a long-term energy monitoring was established in order to evaluate the sustainability of the innovative designs and systems. fraunhofer ise defined enhanced...

Neumann, C.; Herkel, S.; Lohnert, G.; Voss, K.; Wagner, A.

2006-01-01T23:59:59.000Z

265

Continuous particulate monitoring for emission control  

SciTech Connect (OSTI)

An optical continuous particle monitoring system has been developed to overcome common problems associated with emissions monitoring equipment. Opacity monitors generally use a single- or double-pass system to analyze the presence of dust particles in the flue gas stream. The particles scatter and absorb light as it passes through the stack. As the particle content in the gas stream increases due to bag failure or some other problem, the amount of light that is blocked also increases. The opacity monitor compares the amount of lost light energy to the total energy of the light available and translates the signal to percentage of opacity. Opacity monitors are typically installed to meet the requirements set forth by pollution control agencies. Most opacity monitors are designed to meet all of the requirements of the Environmental Protection Agency (EPA) 40 CFR, Part 60, Appendix B, Performance Specification. The new continuous particle monitor (CPM) increases the accuracy of emission monitoring and overcomes typical problems found in conventional emission monitoring devices. The CPM is an optically based, calibratible, continuous dust monitor that uses a microprocessor, transmitter head, and receiver head. When calibrated with an isokinetic sample, a continuous readout of particulate concentration (in mg/m[sup 3]) in the exhaust gas is provided. The system can be used as a filter bag failure system or a long-term emission trend analyzer. Formal testing was conducted to evaluate the effectiveness of the optically based CPM. The monitor was calibrated using particles of a range of compositions, size distributions, and concentrations. The feasibility of using the instrument to measure particle concentration as low as 10 mg/m[sup 3] was examined.

Bock, A.H. (BHA Group, Inc., Kansas City, MO (United States))

1993-08-01T23:59:59.000Z

266

1997 update for the applications guide to vehicle SNM monitors  

SciTech Connect (OSTI)

Ten years have elapsed since the publication of the original applications guide to vehicle special nuclear material (SNM) monitors. During that interval, use of automatic vehicle monitors has become more commonplace, and formal procedures for monitor upkeep and evaluation have become available. New concepts for vehicle monitoring are being explored, as well. This update report reviews the basics of vehicle SNM monitoring, discusses what is new in vehicle SNM monitoring, and catalogs the vehicle SNM monitors that are commercial available.

York, R.L.; Fehlau, P.E.

1997-04-01T23:59:59.000Z

267

I-35W Bridge Monitoring (1) Monitoring and Modeling of the I-35W  

E-Print Network [OSTI]

I-35W Bridge Monitoring (1) Monitoring and Modeling of the I-35W St. Anthony Falls Bridge Brock Hedegaard, Catherine French, and Carol Shield University of Minnesota May 23, 2013 #12;I-35W Bridge Monitoring (2) Outline · Descrip)on of bridge · Smart-bridge instrumenta

Minnesota, University of

268

Path-Quality Monitoring inPath-Quality Monitoring in the Presence of Adversaries  

E-Print Network [OSTI]

Performance Routing Protocols U f db k b t th f t h b t th Routers need tools to detect unacceptably highPath-Quality Monitoring inPath-Quality Monitoring in the Presence of Adversaries Sharon Goldberg SIGMETRICS'08 Annapolis, June 3, 2008 , , , #12;Path-quality Monitoring and the Adversary Does packet loss

Goldberg, Sharon

269

Monitoring change in biodiversity through composite indices  

E-Print Network [OSTI]

Monitoring change in biodiversity through composite indices S.T. Buckland1,*, A.E. Magurran2 , R Zealand The need to monitor trends in biodiversity raises many technical issues. What are the features of a good biodiversity index? How should trends in abundance of individual species be estimated? How should

Buckland, Steve

270

Ecological Monitoring and Compliance Program 2007 Report  

SciTech Connect (OSTI)

In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate the potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.

Dennis Hansen, David Anderson, Derek Hall, Paul Greger, W. Kent Ostler

2008-03-01T23:59:59.000Z

271

A framework for nonparametric profile monitoring  

Science Journals Connector (OSTI)

Control charts have been widely used for monitoring the functional relationship between a response variable and some explanatory variable(s) (called profile) in various industrial applications. In this article, we propose an easy-to-implement framework ... Keywords: B-spline, Block bootstrap, Confidence band, Curve depth, Nonparametric profile monitoring

Shih-Chung Chuang; Ying-Chao Hung; Wen-Chi Tsai; Su-Fen Yang

2013-01-01T23:59:59.000Z

272

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2008-03-12T23:59:59.000Z

273

Scalable Statistical Monitoring of Fleet , Dimitry Gorinevsky  

E-Print Network [OSTI]

LLC, Palo Alto, CA e-mail: dimitry@mitekan.com Abstract: This paper considers the problem of fitting monitoring of data from a fleet (population) of similar units. A fleet-wide extension of the multivariable historical cruise flight data. 1. INTRODUCTION 1.1 Population monitoring problems This paper considers

274

A neutron portal monitor for vehicles  

SciTech Connect (OSTI)

We have designed and built a portal vehicle monitoring systems for detecting neutron-emitting special nuclear material (SNM) such as plutonium. Monte Carlo calculations were used to optimize the design of the 15-cm-deep x 122-cm-high x 244-cm-long detector chambers, which utilize /sup 3/He proportional counters inside a hollow polyethylene box. Results for a variety of parametric studies, including polyethylene thickness and detector number, are described. Our experimental measurements are in good agreement with the computer calculations. The monitor's decision logic uses the Sequential Probability Ratio Test (SPRT) on Poisson distributed counting data, which is superior to other statistical tests in many applications. We performed computer simulations of the SPRT logic to determine expected false-positive decision rates. A controller unit of our design that uses this SPRT was built commercially. The cost of the complete monitoring system is similar to that of vehicle portal monitors that detect gamma rays. This new neutron monitor can serve as an addition to standard gamma-ray vehicle portals or as a stand-alone portal monitor in particular safeguards monitoring situations. The monitor is being tested at Los Alamos and is scheduled for in-plant evaluation of another DOE facility in 1987. 7 refs.

Coop, K.L.; Fehlau, P.E.; Atwater, H.F.

1987-07-12T23:59:59.000Z

275

Monitoring and Evaluation Plan For The  

E-Print Network [OSTI]

,617 acres of wetland habitat and the inundation of 8,900 acres of deep-water marsh. Estimated wildlifeDRAFT Monitoring and Evaluation Plan For The Albeni Falls Wildlife Mitigation Project (BPA Project on vegetation monitoring. Their contributions to this project are greatly appreciated. #12;1 Introduction

276

The monitoring and verification of nuclear weapons  

SciTech Connect (OSTI)

This paper partially reviews and updates the potential for monitoring and verification of nuclear weapons, including verification of their destruction. Cooperative monitoring with templates of the gamma-ray spectrum are an important tool, dependent on the use of information barriers.

Garwin, Richard L., E-mail: RLG2@us.ibm.com [IBM Fellow Emeritus, IBM Thomas J. Watson Research Center, P.O. Box 218, Yorktown Heights, NY 10598 (United States)

2014-05-09T23:59:59.000Z

277

TMV Technology Capabilities Brake Stroke Monitor  

E-Print Network [OSTI]

TMV Technology Capabilities Brake Stroke Monitor Brake monitoring systems are proactive maintenance This technology allows for CMV operators to have knowledge of their steer, drive, and tandem axle group weights setup is required. Current Safety/Enforcement Technologies EOBR (electronic on-board recorder) On

278

Best practice techniques for environmental radiological monitoring  

E-Print Network [OSTI]

Best practice techniques for environmental radiological monitoring Science Report ­ SC030308/SR SCHO0407BMNL-E-P #12;ii Science Report Best Practice Techniques for Environmental Radiological #12;iv Science Report Best Practice Techniques for Environmental Radiological Monitoring Executive

279

Performance Analysis - Environmental Monitoring, Surveillance, and Control  

Broader source: Energy.gov (indexed) [DOE]

Performance Analysis - Environmental Monitoring, Surveillance, and Performance Analysis - Environmental Monitoring, Surveillance, and Control Programs Within the U.S. Department of Energy, October 2002 Performance Analysis - Environmental Monitoring, Surveillance, and Control Programs Within the U.S. Department of Energy, October 2002 This report documents the results of a U.S. Department of Energy (DOE) Office of Independent Oversight and Performance Assurance (OA) analysis of DOE environmental monitoring, surveillance, and control activities. The analysis is based primarily on DOE Headquarters independent oversight evaluations of environmental monitoring and surveillance activities that were conducted at 14 different sites across the DOE complex during fiscal years 1999 through 2002. Independent oversight evaluations determined that all sites had established

280

System health monitoring through wear particle analysis  

SciTech Connect (OSTI)

Recent resource limitations have prompted considerable interest into the area of mechanical equipment wear integrity optimization. A prime consideration under this optimization effort, is the application of wear particle analysis technology to equipment health monitoring. This technology relates the wear debris parameters of quantity, size distribution, composition, and morphology to system wear rate, wear severity, wear source, and wear type. Monitoring of these critical wear debris parameters, through a specific decision process, utilizing pertinent analysis equipment, will serve as a viable health monitoring approach. This wear particle analysis health monitoring approach requires special attention to the critical application areas of sampling, analysis equipment operation, and analysis interpretation. These areas can easily distort the effectiveness of wear particle analysis. The potential payoff of wear particle analysis health monitoring is substantial. It impacts the areas of manpower, materials, energy, time, and cost savings. These potential savings are applicable to both the governmental and industrial communities.

Senholzi, P.B.

1980-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not have detrimental effects on the environment. This EMP is to be reviewed annually and updated every three years unless otherwise requested by the DOE or contractor.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-02-19T23:59:59.000Z

282

DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. Work during this quarter centered on the rebuilding of the prototype using the improved valve design described in the last report. Most of the components have been received and assembly has begun. Testing is expected to resume in August. In April, a paper was presented at the American Association of Drilling Engineers National Technical Conference in Houston. The paper was well received, and several oilfield service and supply companies sent inquiries regarding commercial distribution of the system. These are currently being pursued, but none have yet been finalized.

Martin E. Cobern

2005-07-27T23:59:59.000Z

283

Downhole Vibration Monitoring & Control System  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in a drilling laboratory. Phase II concluded on January 31, 2006, and the Phase II final report was issued. Work on Phase III of the project began during the first quarter, 2006. Efforts the current quarter have continued to focus on the manufacture of the prototype and precommercial parts, field test planning and commercialization. The continued extreme lead times quoted by oilfield machine shops for collar components significantly delayed the deployment of the prototype and precommercial units. All parts have now been received for two units, and all but one for the third. Mechanical assembly of the first two systems is complete and the electronics installation and laboratory testing will be finished in April. We have entered into a Memorandum of Understanding with a major US oilfield equipment supplier, which calls for their assisting with our field tests, in cash and in kind. We are close to signing a definitive agreement which includes the purchase of the three precommercial units. We had also signed a CRADA with the Rocky Mountain Oilfield Test Center (RMOTC), and scheduled a test at their site, The RMOTC drilling schedule continues to slip, and the test cannot begin until the first week of May. Based on these factors, we have requested a no-cost extension to July 31, 2007.

Martin E. Cobern

2007-03-31T23:59:59.000Z

284

DOWNHOLE VIBRATION MONITORING & CONTROL SYSTEM  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. As a result of the lower than expected performance of the MR damper noted last quarter, several additional tests were conducted. These dealt with possible causes of the lack of dynamic range observed in the testing: additional damping from the oil in the Belleville springs; changes in properties of the MR fluid; and, residual magnetization of the valve components. Of these, only the last was found to be significant. By using a laboratory demagnetization apparatus between runs, a dynamic range of 10:1 was achieved for the damper, more than adequate to produce the needed improvements in drilling. Additional modeling was also performed to identify a method of increasing the magnetic field in the damper. As a result of the above, several changes were made in the design. Additional circuitry was added to demagnetize the valve as the field is lowered. The valve was located to above the Belleville springs to reduce the load placed upon it and offer a greater range of materials for its construction. In addition, to further increase the field strength, the coils were relocated from the mandrel to the outer housing. At the end of the quarter, the redesign was complete and new parts were on order. The project is approximately three months behind schedule at this time.

Martin E. Cobern

2005-04-27T23:59:59.000Z

285

Energy Monitoring Act (Canada) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Monitoring Act (Canada) Energy Monitoring Act (Canada) Energy Monitoring Act (Canada) < Back Eligibility Commercial Developer Fuel Distributor Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Alberta Program Type Environmental Regulations Generation Disclosure Provider Minister of Natural Resources This act requires that every energy enterprise file with the Minister a return setting out statistics and information relating to its ownership and control; financial information; information, including financial, about its exploration for, development, production, processing, refining and

286

Exporting automatic vehicle SNM monitoring technology  

SciTech Connect (OSTI)

Controlling the transportation of nuclear materials is still one of the most effective nuclear proliferation barriers. The recent increase of global nuclear material proliferation has expanded the application of vehicle monitor technology to prevent the diversion of special nuclear material across international borders. To satisfy this new application, a high-sensitivity vehicle monitor, which is easy to install and capable of operating in high-traffic areas, is required. A study of a new detector configuration for a drive-through vehicle monitor is discussed in this paper.

York, R.L.; Fehlau, P.E.; Close, D.A.

1995-10-01T23:59:59.000Z

287

Special nuclear material radiation monitors for the 1980's  

SciTech Connect (OSTI)

During the two decades that automatic gamma-radiation monitors have been applied to detecting special nuclear material (SNM), little attention has been devoted to how well the monitors perform in plant environments. Visits to 11 DOE facilities revealed poor information flow between developers, manufacturers, and maintainers of SNM radiation monitors. To help users achieve best performance from their monitors or select new ones, Los Alamos National Laboratory developed a hand-held monitor user's guide, calibration manuals for some commercial SNM pedestrian monitors, and an application guide for SNM pedestrian monitors. In addition, Los Alamos evaluated new commercial SNM monitors, considered whether to apply neutron detection to SNM monitoring, and investigated the problem of operating gamma-ray SNM monitors in variable plutonium gamma-radiation fields. As a result, the performance of existing SNM monitors will improve and alternative monitoring methods will become commerciallly available during the 1980s. 9 refs., 6 figs., 1 tab.

Fehlau, P.E.

1985-01-01T23:59:59.000Z

288

Standardisation of radiation portal monitor controls and readouts  

Science Journals Connector (OSTI)

......Standardisation of radiation portal monitor controls...numbering configuration of radiation portal monitor sensing...addition, second-party software that changes the alarm...Neutrons Nuclear Weapons Radiation Monitoring methods Radiation...Risk Assessment methods Safety Management methods standards......

M. Tinker

2010-10-01T23:59:59.000Z

289

Low-Cost Wireless Sensors for Building Monitoring Applications...  

Broader source: Energy.gov (indexed) [DOE]

Low-Cost Wireless Sensors for Building Monitoring Applications Low-Cost Wireless Sensors for Building Monitoring Applications Lead Performer: Oak Ridge National Laboratory - Oak...

290

T-725: Cisco Unified Service Monitor and Cisco Unified Operations...  

Broader source: Energy.gov (indexed) [DOE]

Monitor and Cisco Unified Operations Manager Remote Code Execution Vulnerabilitiry Code T-725: Cisco Unified Service Monitor and Cisco Unified Operations Manager Remote Code...

291

Monitoring bat and bird fatalities at the Casselman Wind Energy...  

Broader source: Energy.gov (indexed) [DOE]

Monitoring bat and bird fatalities at the Casselman Wind Energy Center in Pennsylvania Monitoring bat and bird fatalities at the Casselman Wind Energy Center in Pennsylvania...

292

PNNL Reviews Wildlife-Interaction Monitoring for Offshore Wind...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

monitoring birds, bats, and aquatic animals such as marine mammals, sea turtles, and fish in the offshore wind farm environment. Informed by monitoring results and research...

293

SciTech Connect: Nuclear Explosion Monitoring Research and Engineering...  

Office of Scientific and Technical Information (OSTI)

Program Document: Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan Citation Details In-Document Search Title: Nuclear Explosion Monitoring Research...

294

Load Monitoring CEC/LMTF Load Research Program  

SciTech Connect (OSTI)

This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

2007-11-30T23:59:59.000Z

295

Monitoring EGS Stimulation and Reservoir Dynamics with InSAR...  

Broader source: Energy.gov (indexed) [DOE]

provides direct monitoring of the progress of fluid pressure into the natural fracture network or surrounding formation. * Objectives: - Improve monitoring of fluid...

296

An Infrared Spectral Library for Atmospheric Environmental Monitoring...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Library for Atmospheric Environmental Monitoring. An Infrared Spectral Library for Atmospheric Environmental Monitoring. Abstract: Infrared (IR) spectroscopy is one of several...

297

Energy Storage Monitoring System and In-Situ Impedance Measurement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Monitoring System and In-Situ Impedance Measurement Modeling Energy Storage Monitoring System and In-Situ Impedance Measurement Modeling 2012 DOE Hydrogen and Fuel Cells Program...

298

Monitoring the Performance of an Alternative Landfill Cover at...  

Office of Environmental Management (EM)

Monitoring the Performance of an Alternative Landfill Cover at the Monticello, Utah, Uranium Mill Tailings Disposal Site Monitoring the Performance of an Alternative Landfill Cover...

299

Electrochemical NOxSensor for Monitoring Diesel Emissions | Department...  

Broader source: Energy.gov (indexed) [DOE]

Diesel Emissions Electrochemical NOxSensor for Monitoring Diesel Emissions pm02glass.pdf More Documents & Publications Electrochemical NOx Sensor for Monitoring Diesel...

300

Solar Decathlon 2005, Instrumentation and Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Decathlon 2005: The Event in Review Decathlon 2005: The Event in Review Web Site Resources: Instrumentation and Monitoring 1 Solar Decathlon 2005, Instrumentation and Monitoring The Solar Decathlon organizers installed sensors and monitoring equipment in each house during assembly and removed the equipment during disassembly. (Some of the equipment was installed on prior visits to the teams' sites on their campuses during construction.) The locations of sensors and monitoring equipment were planned in advance through negotiations between the organizers and each team. Installation had to be completed on the Mall at least two days before the start of the objectively measured contests (October 10, 2005). Most of the teams, despite their very best intentions, were finishing construction of their houses during assembly on the Mall, which made

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Groundwater Monitoring at NETL-Albany  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About NETL About NETL Groundwater Monitoring at NETL-Albany GEO Probe Ground Water Testing Program NETL is committed to the safety and health of its employees and of nearby residents and to protecting the environment. As part of a DOE environmental protection program, NETL initiated a ground water monitoring program in 2001 with the Oregon Department of Environmental Quality (DEQ) to evaluate the groundwater flowing beneath the Albany, OR facility. Ground water monitoring wells were installed at that time, and periodic samples were taken. In March 2005, a newly-installed monitoring well on NETL's property indicated elevated ground water levels of a chemical commonly used as a degreaser or solvent until the late 1970's, trichloroethene (TCE). TCE is of concern because prolonged exposure may cause health problems, and it has been identified as a probable human carcinogen (cancer-causing substance).

302

China-GHG Monitoring | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » China-GHG Monitoring (Redirected from GIZ-China GHG Monitoring) Jump to: navigation, search Name China - GHG Monitoring Agency/Company /Organization German Agency for International Cooperation (GIZ), Center for Clean Air Policy Partner on behalf of the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) Sector Energy Focus Area Energy Efficiency Topics Low emission development planning Program Start 2011 Program End 2014 Country China Eastern Asia References GTZ in the People's Republic of China[1] Overview The project aims to develop capacities for a GHG-Monitoring system and an

303

Definition: Disturbance Monitoring Equipment | Open Energy Information  

Open Energy Info (EERE)

Disturbance Monitoring Equipment Disturbance Monitoring Equipment Jump to: navigation, search Dictionary.png Disturbance Monitoring Equipment Devices capable of monitoring and recording system data pertaining to a Disturbance. Such devices include the following categories of recorders: Sequence of event recorders which record equipment response to the event., Fault recorders, which record actual waveform data replicating the system primary voltages and currents. This may include protective relays., Dynamic Disturbance Recorders (DDRs), which record incidents that portray power system behavior during dynamic events such as low-frequency (0.1 Hz - 3 Hz) oscillations and abnormal frequency or voltage excursions. Phasor Measurement Units and any other equipment that meets the functional requirements of DMEs may qualify as DMEs.[1]

304

Building Energy Monitoring System: Making Energy Manageable  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Energy Monitoring System: Making Energy Manageable Building Energy Monitoring System: Making Energy Manageable Speaker(s): Bob Hunter Date: July 21, 2006 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Peng Xu For any line-item expense to be managed, it must first be manageable. In most organizations, this means bringing that expense into the budget/forecast/variance cycle at the department and individual level. While energy costs are the second fastest growing for most organizations, they have simply received a pass on individual accountability. TrendPoint provides a patented system for monitoring energy at the department and user-level. By monitoring each circuit, we assign a circuit to a user, each user to a group and each group to a site. Energy budgets can then be created and assigned to departments, allowing energy costs become a part of

305

Solar Decathlon 2007 Instrumentation and Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Solar Decathlon 2007 Solar Decathlon 2007 Instrumentation and Monitoring The Solar Decathlon Instrumentation and Monitoring Group (IMG), led by Mountain Energy Partnership (MEP) personnel, installed sensors and monitoring equipment in each house during assembly and removed the equipment during disassembly. The locations of sensors and monitoring equipment were planned in advance through negotiations between the organizers and each team. Installation had to be completed on the Mall at least two days before the start of the objectively measured contests (October 15, 2007). Most of the teams, despite their best intentions, were finishing construction of their houses during assembly on the Mall, which made installation of instrumentation a bit tricky. MEP is accustomed to working with the normal last-minute nature of

306

Monitored Retrievable Storage Background | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Monitored Retrievable Storage Background Monitored Retrievable Storage Background Monitored Retrievable Storage Background `The U.S. Government is seeking a site for a monitored retrievable storage facility (MRS). Employing proven technologies used in this country and abroad, the MRS will be an Integral part of the Federal system for safe and permanent disposal of the nation's high-level radioactive wastes. The MRS will accept shipments of spent fuel from commercial nuclear power plants, temporarily store the spent fuel above ground, and stage shipments of it to a geologic repository for permanent disposal. The law authorizing the MRS provides an opportunity for a State or an Indian Tribe to volunteer to host the MRS. The law establishes the Office of the Nuclear Waste Negotiator, who Is 10 seek a State or an Indian Tribe

307

Verification and Monitoring: Requirements and Procedures  

Science Journals Connector (OSTI)

When a cleanroom is first installed or any significant changes ... and control. Many of the procedures for cleanroom monitoring are described in IES RP-006,...Recommended Practice for Testing Clean Ro...

Alvin Lieberman

1992-01-01T23:59:59.000Z

308

Wireless, automated monitoring for potential landslide hazards  

E-Print Network [OSTI]

This thesis describes research efforts toward the development of a wireless sensor node, which can be employed in durable and expandable wireless sensor networks for remote monitoring of soil conditions in areas conducive to slope stability failures...

Garich, Evan Andrew

2007-09-17T23:59:59.000Z

309

Monitor lube-oil quality in service  

SciTech Connect (OSTI)

Monitoring oil quality in service has two main objectives: 1. to ensure that the oil stays in good condition for continued service, and 2. to provide early detection of wear or malfunction of machine components lubricated by the oil. Effective condition monitoring is needed to improve machine availability and reliability. The results are long uninterrupted process runs and low maintenance costs. These goals have motivated monitoring many important machinery conditions such as lubricating oil quality. The results of such monitoring can be used for problems detection and diagnosis. While detection indicates that damage may have occurred, diagnosis follows up to confirm that the detection was triggered by a genuine distress and not some interfering effects. Further, it identifies which elements of a machine is damaged.

El Sherif, A.H. (Abu Dhabi Marine Operating Co., Abu Dhabi (United Arab Emirates))

1993-08-01T23:59:59.000Z

310

The Savannah River Site's Groundwater Monitoring Program  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program's activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

Not Available

1990-10-18T23:59:59.000Z

311

Certification of flow monitors for utility boilers  

SciTech Connect (OSTI)

The use of CEMS for measuring opacity, SO{sub 2}, NO{sub x}, CO{sub 2}, and O{sub 2} concentration was well proven prior to implementing the Part 75 CEMS program. However, the use of continuous flue gas flow monitoring devices is a relatively new instrumental technique. Limited operating data for flow monitors were available and little or no certification relative accuracy data were available prior to the Summer of 1993. However, because of the Part 75 requirements, utility companies contracted with CEMS vendors to install, start-up and certify flow monitors on Phase 1 and Phase 2 units. This paper presents the certification history of three different types of flow monitors (ultrasonic, pressure differential ({Delta}p) and thermal) installed at various utilities in the US. The data and experience was obtained from approximately 100 Phase 1 CEMS units and 200 Phase 1 CEMS units.

Bensink, J.; Beachler, D.; Joseph, J.

1995-12-31T23:59:59.000Z

312

Introduction: Monitoring, Prediction and Warning of Landslides  

Science Journals Connector (OSTI)

The WLF3 B5.Session Monitoring, prediction and warning of landslides, as a part of WLF3 session Group B. Sessions for Methods of Landslide Studies, gathers the main elements in the landslides risk reduction an...

eljko Arbanas; Teuku Faisal Fathani

2014-01-01T23:59:59.000Z

313

Structural health monitoring of civil infrastructure  

Science Journals Connector (OSTI)

...Geier, R. Wenzel, H. 2002 Bridge classification based...R.H Scanlan, and H.R Bosch1990Wind response of flexible bridges. J. Wind Eng. Ind...C. Y. Chen, C. H. 2003 Development of bridge health monitoring systems...

2007-01-01T23:59:59.000Z

314

Optical instrumentation for vibration measurement and monitoring  

Science Journals Connector (OSTI)

Monitoring of machine tool vibrations is an important aspect of precision manufacturing ... of a simple and unique instrument for precise vibration measurement that can be used in industry. The ... laboratory. Th...

Devdas Shetty; Ahad Ali; Jonathan Hill

2011-06-01T23:59:59.000Z

315

Fuel Consumption Monitoring and Diesel Engines  

Science Journals Connector (OSTI)

In a perspective to explore how fuel monitoring and diesel engine life are interconnected, its necessary to ... touch several issues such as specifics of diesel engines in fuel consumption, the effects of precis...

Anna Antimiichuk

2014-09-01T23:59:59.000Z

316

Radiation Exposure Monitoring Systems Data Submittal Notification  

Broader source: Energy.gov [DOE]

Monitoring records are required to be reported to the Department of Energy (DOE) Radiation Records Repository by March 31 under DOE Order 231.1B and in accordance with the REMS Reporting Guide.

317

Navy Technology Validation (Techval) Monitoring Results  

Broader source: Energy.gov [DOE]

Presentation covers the Navy Technology Validation (Techval) Monitoring Results and is given at the Federal Utility Partnership Working Group (FUPWG) 2006 Spring meeting, held on May 3-4, 2006 in Atlanta, Georgia.

318

Environmental impacts of proposed Monitored Retrievable Storage  

SciTech Connect (OSTI)

This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

Not Available

1985-12-17T23:59:59.000Z

319

Recommendations for Improvement of RMP Sediment Monitoring  

E-Print Network [OSTI]

, OR Prepared For Regional Monitoring Program for Trace Substances San Francisco Estuary Institute 1325 S. 46th in the Atlas of Sediment Contamination, Toxicity, and Benthic Assemblages (Thompson and Daum, in prep.). #12

320

Beyond the Guidelines: Practical lessons for monitoring  

Science Journals Connector (OSTI)

A series of workshops have provided extensive feedback on a recently published manual, Monitoring Guidelines to Evaluate Effects of Forestry Activities on Streams in the Pacific Northwest and Alaska (Guidelines) ...

Lee H. Macdonald; Alan Smart

1993-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Structural health monitoring using piezoelectric impedance measurements  

Science Journals Connector (OSTI)

...joint with bonded PZT patch (light circle) and...integrity of composite patch structural repair via piezoelectric actuators...damage assessment for pipeline systems. Earthquake...of smart piezoceramic patches in health monitoring...

2007-01-01T23:59:59.000Z

322

SPALLATION NEUTRON SOURCE BEAM CURRENT MONITOR ELECTRONICS.  

SciTech Connect (OSTI)

The Spallation Neutron Source (SNS) to be constructed at ORNL is a collaboration of six laboratories. Beam current monitors for SNS will be used to monitor H-minus and H-plus beams ranging from the 15 mA (tune-up in the Front End and Linac) to over 60 A fully accumulated in the Ring. The time structure of the beams to be measured range from 645 nsec ''mini'' bunches, at the 1.05 MHz ring revolution rate, to an overall 1 mS long macro pulse. Beam current monitors (BCMs) for SNS have requirements depending upon their location within the system. The development of a general approach to satisfy requirements of various locations with common components is a major design objective. This paper will describe the development of the beam current monitors and electronics.

KESSELMAN, M.

2001-06-18T23:59:59.000Z

323

Online Raman spectroscopy for bioprocess monitoring  

E-Print Network [OSTI]

Online monitoring of bioprocesses is essential to expanding the potential of biotechnology. In this thesis, a system to estimate concentrations of chemical components of an Escherichia Coli fermentation growth medium via ...

Gil, Gustavo Adolfo

2005-01-01T23:59:59.000Z

324

Safety Monitor Joint Working Group (JWG) Tour  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 th Meeting of the Joint Working Group of the U.S.-Japan Coordinating Committee of Fusion Energy on Safety in Inter-Institutional Collaborations (U.S.-Japan Safety Monitoring...

325

Mercury Continuous Emmission Monitor Calibration  

SciTech Connect (OSTI)

Mercury continuous emissions monitoring systems (CEMs) are being implemented in over 800 coal-fired power plant stacks throughput the U.S. Western Research Institute (WRI) is working closely with the Electric Power Research Institute (EPRI), the National Institute of Standards and Technology (NIST), and the Environmental Protection Agency (EPA) to facilitate the development of the experimental criteria for a NIST traceability protocol for dynamic elemental mercury vapor calibrators/generators. These devices are used to calibrate mercury CEMs at power plant sites. The Clean Air Mercury Rule (CAMR) which was published in the Federal Register on May 18, 2005 and vacated by a Federal appeals court in early 2008 required that calibration be performed with NIST-traceable standards. Despite the vacature, mercury emissions regulations in the future will require NIST traceable calibration standards, and EPA does not want to interrupt the effort towards developing NIST traceability protocols. The traceability procedures will be defined by EPA. An initial draft traceability protocol was issued by EPA in May 2007 for comment. In August 2007, EPA issued a conceptual interim traceability protocol for elemental mercury calibrators. The protocol is based on the actual analysis of the output of each calibration unit at several concentration levels ranging initially from about 2-40 {micro}g/m{sup 3} elemental mercury, and in the future down to 0.2 {micro}g/m{sup 3}, and this analysis will be directly traceable to analyses by NIST. The EPA traceability protocol document is divided into two separate sections. The first deals with the qualification of calibrator models by the vendors for use in mercury CEM calibration. The second describes the procedure that the vendors must use to certify the calibrators that meet the qualification specifications. The NIST traceable certification is performance based, traceable to analysis using isotope dilution inductively coupled plasma/mass spectrometry (ID/ICP/MS) performed by NIST in Gaithersburg, MD. The outputs of mercury calibrators are compared to one another using a nesting procedure which allows direct comparison of one calibrator with another at specific concentrations and eliminates analyzer variability effects. The qualification portion of the EPA interim traceability protocol requires the vendors to define calibrator performance as affected by variables such as pressure, temperature, line voltage, and shipping. In 2007 WRI developed and conducted a series of simplified qualification experiments to determine actual calibrator performance related to the variables defined in the qualification portion of the interim protocol.

John Schabron; Eric Kalberer; Ryan Boysen; William Schuster; Joseph Rovani

2009-03-12T23:59:59.000Z

326

Ultrasonic techniques for process monitoring and control.  

SciTech Connect (OSTI)

Ultrasonic techniques have been applied successfully to process monitoring and control for many industries, such as energy, medical, textile, oil, and material. It helps those industries in quality control, energy efficiency improving, waste reducing, and cost saving. This paper presents four ultrasonic systems, ultrasonic viscometer, on-loom, real-time ultrasonic imaging system, ultrasonic leak detection system, and ultrasonic solid concentration monitoring system, developed at Argonne National Laboratory in the past five years for various applications.

Chien, H.-T.

1999-03-24T23:59:59.000Z

327

Mixed Waste Management Facility Groundwater Monitoring Report  

SciTech Connect (OSTI)

During fourth quarter 1997, eleven constituents exceeded final Primary Drinking Water Standards (PDWS) in groundwater samples from downgradient monitoring wells at the Mixed Waste Management Facility. No constituents exceeded final PDWS in samples from upgradient monitoring wells. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents. The groundwater flow directions and rates in the three hydrostratigraphic units were similar to those of previous quarters.

Chase, J.

1998-03-01T23:59:59.000Z

328

Monitoring Energy Efficiency in Sophisticated Process Plants  

E-Print Network [OSTI]

MONITORING ENERGY EFFICIENCY IN SOPHISTICATED PROCESS PLANTS William F. Kenney Exxon Chemical Company Florham Park, New Jersey The proper operation of existing facilities is needed if design improvements are to be reduced to practice.... ETCI ? HELPS IDENTIFY CORRECTIVE ACTION ? SUITABLE FOR FREQUENT MONITORING BY PLANT OPERATIONS o :::l o o a: Cl. t: z :::l " o W N -l ..... :::l > (D a: w z w ~-OPERATING DATA POINTS INCENTIVE FOR IMPROVED OPERATION...

Kenney, W. F.

1981-01-01T23:59:59.000Z

329

Self-monitoring and leadership emergence  

E-Print Network [OSTI]

's personal approach to the group accordingly. This description is almost identi- cal to the description of the high self-monitoring individual. Per- haps, rather than discarding the trait theories we merely need to reconceptualize our approach. Maybe... of this effect. One factor which may prevent the high self-monitoring individual from emerging as the leader would be the existence of prior status differences within the group. Status generalization theory maintains that status charac- teristics which...

Cohen, Brett Alan

2012-06-07T23:59:59.000Z

330

The Savannah River Site's groundwater monitoring program  

SciTech Connect (OSTI)

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in this report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.

Not Available

1991-05-06T23:59:59.000Z

331

Calibrating the Jomar JPM-22 pedestrian SNM monitor  

SciTech Connect (OSTI)

The Jomar JPM-22 is a commercial version of a portal monitor developed at Los Alamos. The monitor operates as a walk-through or wait-in SNM monitor. This manual describes how to calibrate the monitor's detection system and how to set its operating parameters for walk-through or wait-in operation. 4 figs., 2 tabs.

Fehlau, P.E.

1989-08-01T23:59:59.000Z

332

Preliminary Technical Results of World Bank Gasifier Monitorings  

Science Journals Connector (OSTI)

Through the World Bank/UNDP Gasifier Monitoring Programme, a number of gasification installations...

M. S. Mendis; H. E. M. Stassen; H. N. Stiles

1988-01-01T23:59:59.000Z

333

A scalable and tiling multi-monitor aware window manager  

Science Journals Connector (OSTI)

The design of a prototypical scalable and tiling multi-monitor aware window manager is described that may overcome some of the layout management problems encountered with tiling window managers. The system also features a novel approach to monitor configuration ... Keywords: distal access, monitor configuration, multiple monitors, window management, window manager

Joona Antero Laukkanen

2011-05-01T23:59:59.000Z

334

Optimal Location of a Mobile Sensor Continuum for Environmental Monitoring  

E-Print Network [OSTI]

air pollution monitoring, seismic monitoring, or monitoring of large infrastructures in civil is proposed for the goal of optimal location of a mobile sensor continuum. The monitoring of pollution on a 2D or track distributed environmental phenomena (weather, seismic events, wildfires, air, soil or river

Boyer, Edmond

335

Standard-C hydrogen monitoring system, system design description  

SciTech Connect (OSTI)

Standard-C cabinet arrangement system design description for the Standard Hydrogen Monitoring System.

Schneider, T.C., Westinghouse Hanford

1996-08-29T23:59:59.000Z

336

Body monitoring and imaging apparatus and method  

DOE Patents [OSTI]

A non-acoustic pulse-echo radar monitor is employed in the repetitive mode, whereby a large number of reflected pulses are averaged to produce a voltage that modulates an audio oscillator to produce a tone that corresponds to the heart motion. The antenna used in this monitor generally comprises two flat copper foils, thus permitting the antenna to be housed in a substantially flat housing. The monitor converts the detected voltage to an audible signal with both amplitude modulation and Doppler effect. It further uses a dual time constant to reduce the effect of gross sensor-to-surface movement. The monitor detects the movement of one or more internal body parts, such as the heart, lungs, arteries, and vocal chords, and includes a pulse generator for simultaneously inputting a sequence of pulses to a transmit path and a grating path. The pulses transmitted along the transmit path drive Oh impulse, generator and provide corresponding transmit pulses that are applied to a transmit antenna. The gating path includes a range delay generator which generates timed gating pulses. The timed gating pulses cause the receive path to selectively conduct pulses reflected from the body parts and received by a receive antenna. The monitor output potential can be separated into a cardiac output indicative of the physical movement of the heart, and a pulmonary output indicative of the physical movement of the lung. The impulse generator in the transmit path can be replaced with a pulsed RF generator.

McEwan, Thomas E. (Livermore, CA)

1998-01-01T23:59:59.000Z

337

Body monitoring and imaging apparatus and method  

DOE Patents [OSTI]

A non-acoustic pulse-echo radar monitor is employed in the repetitive mode, whereby a large number of reflected pulses are averaged to produce a voltage that modulates an audio oscillator to produce a tone that corresponds to the heart motion. The antenna used in this monitor generally comprises two flat copper foils, thus permitting the antenna to be housed in a substantially flat housing. The monitor converts the detected voltage to an audible signal with both amplitude modulation and Doppler effect. It further uses a dual time constant to reduce the effect of gross sensor-to-surface movement. The monitor detects the movement of one or more internal body parts, such as the heart, lungs, arteries, and vocal chords, and includes a pulse generator for simultaneously inputting a sequence of pulses to a transmit path and a grating path. The pulses transmitted along the transmit path drive Oh impulse, generator and provide corresponding transmit pulses that are applied to a transmit antenna. The gating path includes a range delay generator which generates timed gating pulses. The timed gating pulses cause the receive path to selectively conduct pulses reflected from the body parts and received by a receive antenna. The monitor output potential can be separated into a cardiac output indicative of the physical movement of the heart, and a pulmonary output indicative of the physical movement of the lung. The impulse generator in the transmit path can be replaced with a pulsed RF generator. 13 figs.

McEwan, T.E.

1998-06-16T23:59:59.000Z

338

Body monitoring and imaging apparatus and method  

DOE Patents [OSTI]

A non-acoustic pulse-echo radar monitor is employed in the repetitive mode, whereby a large number of reflected pulses are averaged to produce a voltage that modulates an audio oscillator to produce a tone that corresponds to the heart motion. The antenna used in this monitor generally comprises two flat copper foils, thus permitting the antenna to be housed in a substantially flat housing. The monitor converts the detected voltage to an audible signal with both amplitude modulation and Doppler effect. It further uses a dual time constant to reduce the effect of gross sensor-to-surface movement. The monitor detects the movement of one or more internal body parts, such as the heart, lungs, arteries, and vocal chords, and includes a pulse generator for simultaneously inputting a sequence of pulses to a transmit path and a gating path. The pulses transmitted along the transmit path drive an impulse generator and provide corresponding transmit pulses that are applied to a transmit antenna. The gating path includes a range delay generator which generates timed gating pulses. The timed gating pulses cause the receive path to selectively conduct pulses reflected from the body parts and received by a receive antenna. The monitor output potential can be separated into a cardiac output indicative of the physical movement of the heart, and a pulmonary output indicative of the physical movement of the lung. 12 figs.

McEwan, T.E.

1996-11-12T23:59:59.000Z

339

Body monitoring and imaging apparatus and method  

DOE Patents [OSTI]

A non-acoustic pulse-echo radar monitor is employed in the repetitive mode, whereby a large number of reflected pulses are averaged to produce a voltage that modulates an audio oscillator to produce a tone that corresponds to the heart motion. The antenna used in this monitor generally comprises two flat copper foils, thus permitting the antenna to be housed in a substantially flat housing. The monitor converts the detected voltage to an audible signal with both amplitude modulation and Doppler effect. It further uses a dual time constant to reduce the effect of gross sensor-to-surface movement. The monitor detects the movement of one or more internal body parts, such as the heart, lungs, arteries, and vocal chords, and includes a pulse generator for simultaneously inputting a sequence of pulses to a transmit path and a gating path. The pulses transmitted along the transmit path drive an impulse generator and provide corresponding transmit pulses that are applied to a transmit antenna. The gating path includes a range delay generator which generates timed gating pulses. The timed gating pulses cause the receive path to selectively conduct pulses reflected from the body parts and received by a receive antenna. The monitor output potential can be separated into a cardiac output indicative of the physical movement of the heart, and a pulmonary output indicative of the physical movement of the lung.

McEwan, Thomas E. (Livermore, CA)

1996-01-01T23:59:59.000Z

340

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Monitoring the Monitor: An Approach towards Trustworthiness in Service Oriented Architecture  

E-Print Network [OSTI]

Monitoring the Monitor: An Approach towards Trustworthiness in Service Oriented Architecture {mahantesh, harish, hridesh}@cs.iastate.edu ABSTRACT The key notion in service-oriented architecture of the service requests. In this work, we describe an extension of the service-oriented architecture

Rajan, Hridesh

342

Wireless Technologies for Structural Wireless Technologies for Structural Health MonitoringHealth Monitoring  

E-Print Network [OSTI]

Wireless Technologies for Structural Wireless Technologies for Structural Health MonitoringHealth Monitoring Dr. Jerome P. Lynch Department of Civil and Environmental Engineering Department of Electrical of Michigan Slide #2 8/12/2012 · Introduction · Hardware design of wireless sensors: ­ Commercial and academic

343

L. Evers, Infrasound monitoring in the Netherlands 1 Infrasound Monitoring in the Netherlands  

E-Print Network [OSTI]

L. Evers, Infrasound monitoring in the Netherlands 1 journaal nr. 176 sept. 2005 Infrasound Monitoring in the Netherlands Läslo Evers Royal Netherlands Meteorological Institute KNMI, PO Box 201, 3730 AE De Bilt, the Netherlands +31-30-2206335, evers@kmni.nl Abstract The Royal Netherlands

Evers, Läslo G.

344

Long-Term Surveillance and Monitoring Program Annual Site Inspection and Monitoring Report  

Office of Legacy Management (LM)

Monitoring Program Monitoring Program Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites Annual Report for the Period January 1,1998, Through December 31,1998 February 1999 This file contains inspection data for the Shiprock Site only. Long-Term Surveillance and Monitoring Program Annual Site inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites 1998 Annual Report February 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-966587335 Task Order Number MAC 99-06 Document Number SO0184 Contents Page 1.0 Introduction .......................................................... SHP-I

345

E-Print Network 3.0 - atmospheric pollution monitor Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

monitor Search Powered by Explorit Topic List Advanced Search Sample search results for: atmospheric pollution monitor...

346

E-Print Network 3.0 - atmospheric pollution monitoring Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

monitoring Search Powered by Explorit Topic List Advanced Search Sample search results for: atmospheric pollution monitoring...

347

Periscope pop-in beam monitor  

SciTech Connect (OSTI)

The authors have built monitors for use as beam diagnostics in the narrow gap of an undulator for an FEL experiment. They utilize an intercepting screen of doped YAG scintillating crystal to make light that is imaged through a periscope by conventional video equipment. The absolute position can be ascertained by comparing the electron beam position with the position of a He:Ne laser that is observed by this pop-in monitor. The optical properties of the periscope and the mechanical arrangement of the system mean that beam can be spatially determined to the resolution of the camera, in this case approximately 10 micrometers. The experience with these monitors suggests improvements for successor designs, which they also describe.

Johnson, E.D.; Graves, W.S. [Brookhaven National Lab., Upton, NY (United States). National Synchrotron Light Source; Robinson, K.E. [STI Optronics, Bellevue, WA (United States)

1998-06-01T23:59:59.000Z

348

High resolution in situ ultrasonic corrosion monitor  

DOE Patents [OSTI]

An ultrasonic corrosion monitor is provided which produces an in situ measurement of the amount of corrosion of a monitoring zone or zones of an elongate probe placed in the corrosive environment. A monitoring zone is preferably formed between the end of the probe and the junction of the zone with a lead-in portion of the probe. Ultrasonic pulses are applied to the probe and a determination made of the time interval between pulses reflected from the end of the probe and the junction referred to, both when the probe is uncorroded and while it is corroding. Corresponding electrical signals are produced and a value for the normalized transit time delay derived from these time interval measurements is used to calculate the amount of corrosion.

Grossman, Robert J. (Schenectady, NY)

1985-01-01T23:59:59.000Z

349

Comparison Measurements of Silicon Carbide Temperature Monitors  

SciTech Connect (OSTI)

As part of the efforts initiated through the Advanced Test Reactor (ATR) National Scientific User Facility (NSUF) program to make Silicon Carbide (SiC) temperature monitors available, a capability was developed at the Idaho National Laboratory (INL) to complete post-irradiation evaluations of these monitors. INL selected the resistance measurement approach for detecting peak irradiation temperature from SiC temperature monitors. To demonstrate this new capability, comparison measurements were completed by INL and Oak Ridge National Laboratory (ORNL) on identical samples subjected to identical irradiation conditions. Results reported in this paper indicate that the resistance measurement approach can yield similar peak irradiation temperatures if appropriate equipment is used and appropriate procedures are followed.

J. L. Rempe; K. G. Condie; D. L. Knudson; L. L. Snead

2010-06-01T23:59:59.000Z

350

The Savannah River Site's Groundwater Monitoring Program  

SciTech Connect (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

351

The Savannah River Site's Groundwater Monitoring Program  

SciTech Connect (OSTI)

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

Not Available

1992-01-10T23:59:59.000Z

352

Solar Powered Radioactive Air Monitoring Stations  

SciTech Connect (OSTI)

Environmental monitoring of ambient air for radioactive material is required as stipulated in the PNNL Site radioactive air license. Sampling ambient air at identified preferred locations could not be initially accomplished because utilities were not readily available. Therefore, solar powered environmental monitoring systems were considered as a possible option. PNNL purchased two 24-V DC solar powered environmental monitoring systems which consisted of solar panels, battery banks, and sampling units. During an approximate four month performance evaluation period, the solar stations operated satisfactorily at an on-site test location. They were subsequently relocated to their preferred locations in June 2012 where they continue to function adequately under the conditions found in Richland, Washington.

Barnett, J. M.; Bisping, Lynn E.; Gervais, Todd L.

2013-10-30T23:59:59.000Z

353

Environmental monitoring report for calendar year 1985  

SciTech Connect (OSTI)

The results of the environmental monitoring program for CY85 for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. All of the tokamak machines, the Princeton Large Torus (PLT), Princeton Beta Experiment (PBX), and the Tokamak Fusion Test Reactor (TFTR), has a full year of run time. In addition, the S-1 Spheromak and the RF Test Facility were in operation. The phased approach to TFTR environmental monitoring continued with the establishment of locations for off-site monitoring. An environmental committee established in December 1984 reviewed items of environmental importance. During CY85 no adverse effects to the environmental resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable Federal, State, and local environmental regulations.

Stencel, J.R.

1986-05-01T23:59:59.000Z

354

Wireless boundary monitor system and method  

DOE Patents [OSTI]

A wireless boundary monitor system used to monitor the integrity of a boundary surrounding an area uses at least two housings having at least one transmitting means for emitting ultrasonic pressure waves to a medium. Each of the housings has a plurality of receiving means for sensing the pressure waves in the medium. The transmitting means and the receiving means of each housing are aimable and communicably linked. At least one of the housings is equipped with a local alarm means for emitting a first alarm indication whereby, when the pressure waves propagating from a transmitting means to a receiving means are sufficiently blocked by an object a local alarm means or a remote alarm means or a combination thereof emit respective alarm indications. The system may be reset either manually or automatically. This wireless boundary monitor system has useful applications in both indoor and outdoor environments.

Haynes, Howard D. (Knoxville, TN); Ayers, Curtis W. (Kingston, TN)

1997-01-01T23:59:59.000Z

355

Routine Operational Environmental Monitoring schedule, CY 1994  

SciTech Connect (OSTI)

This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

Schmidt, J.W.

1993-12-01T23:59:59.000Z

356

Los Alamos scientists monitor Santa's magical journey  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scientists monitor Santa's magical journey Scientists monitor Santa's magical journey Los Alamos scientists monitor Santa's magical journey Los Alamos trackers will use state-of-the-art technology to mark the course taken by St. Nick and his eight tiny and highly efficient reindeer. December 21, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

357

Online Sensor Calibration Monitoring Uncertainty Estimation  

SciTech Connect (OSTI)

Empirical modeling techniques have been applied to online process monitoring to detect equipment and instrumentation degradations. However, few applications provide prediction uncertainty estimates, which can provide a measure of confidence in decisions. This paper presents the development of analytical prediction interval estimation methods for three common nonlinear empirical modeling strategies: artificial neural networks, neural network partial least squares, and local polynomial regression. The techniques are applied to nuclear power plant operational data for sensor calibration monitoring, and the prediction intervals are verified via bootstrap simulation studies.

Hines, J. Wesley; Rasmussen, Brandon [University of Tennessee (United States)

2005-09-15T23:59:59.000Z

358

Class 3 Tracking and Monitoring System Report  

SciTech Connect (OSTI)

The objective of Class 3 tracking system are to assist DOE in tracking and performance and progress of these projects and to capture the technical and financial information collected during the projects' monitoring phase. The captured information was used by DOE project managers and BDM-Oklahoma staff for project monitoring and evaluation, and technology transfer activities. The proposed tracking system used the Class Evaluation Executive Report (CLEVER), a relation database for storing and disseminating class project data; GeoGraphix, a geological and technical analysis and mapping software system; the Tertiary Oil Recovery Information System (TORIS) database; and MS-Project, a project management software system.

Safely, Eugene; Salamy, S. Phillip

1999-11-29T23:59:59.000Z

359

Rankine cycle leak detection via continuous monitoring  

SciTech Connect (OSTI)

Rankine cycle power plants operate on a closed cycle in which heat is transferred from a high temperature reservoir to a low temperature sink while performing useful work. leaks in this cycle cause the loss of working fluid and/or corrosion of the power plant. Both of these constitute a loss of capital assets. A severe leak can reduce the efficiency of the cycle to the extent of creating an operating loss. PNL is undertaking the development of continuous monitoring techniques to protect rankine cycle plants from such losses. The location of these continuous monitors on an organic rankine cycle is described and shown schematically.

Kindle, Cecil H.

1982-10-08T23:59:59.000Z

360

Ongoing monitoring and verification in Iraq  

SciTech Connect (OSTI)

When Iraq informed the United Nations last November 26 that it would cooperate in implementing the plans to monitor compliance with its obligations not to reacquire weapons banned under the ceasefire agreements following the Gulf War, it signalled an apparent policy reversal after two years of difficulties, deadlocks and limited cooperation. While claiming never to have rejected the plans to implement nationwide monitoring and inspections to prevent the import or manufacture of nuclear, chemical and biological weapons and long-range ballistic missiles, Iraq consistently spoke of the plans in terms of political, if not legal, rejection.

Trevan, T.

1994-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Wide-area, real-time monitoring and visualization system  

SciTech Connect (OSTI)

A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

Budhraja, Vikram S. (Los Angeles, CA); Dyer, James D. (La Mirada, CA); Martinez Morales, Carlos A. (Upland, CA)

2011-11-15T23:59:59.000Z

362

Wide-area, real-time monitoring and visualization system  

DOE Patents [OSTI]

A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

Budhraja, Vikram S.; Dyer, James D.; Martinez Morales, Carlos A.

2013-03-19T23:59:59.000Z

363

Real-time performance monitoring and management system  

DOE Patents [OSTI]

A real-time performance monitoring system for monitoring an electric power grid. The electric power grid has a plurality of grid portions, each grid portion corresponding to one of a plurality of control areas. The real-time performance monitoring system includes a monitor computer for monitoring at least one of reliability metrics, generation metrics, transmission metrics, suppliers metrics, grid infrastructure security metrics, and markets metrics for the electric power grid. The data for metrics being monitored by the monitor computer are stored in a data base, and a visualization of the metrics is displayed on at least one display computer having a monitor. The at least one display computer in one said control area enables an operator to monitor the grid portion corresponding to a different said control area.

Budhraja, Vikram S. (Los Angeles, CA); Dyer, James D. (La Mirada, CA); Martinez Morales, Carlos A. (Upland, CA)

2007-06-19T23:59:59.000Z

364

Wireless device monitoring methods, wireless device monitoring systems, and articles of manufacture  

DOE Patents [OSTI]

Wireless device monitoring methods, wireless device monitoring systems, and articles of manufacture are described. According to one embodiment, a wireless device monitoring method includes accessing device configuration information of a wireless device present at a secure area, wherein the device configuration information comprises information regarding a configuration of the wireless device, accessing stored information corresponding to the wireless device, wherein the stored information comprises information regarding the configuration of the wireless device, comparing the device configuration information with the stored information, and indicating the wireless device as one of authorized and unauthorized for presence at the secure area using the comparing.

McCown, Steven H. (Rigby, ID); Derr, Kurt W. (Idaho Falls, ID); Rohde, Kenneth W. (Idaho Falls, ID)

2012-05-08T23:59:59.000Z

365

Scientific Opportunities for Monitoring at Environmental Remediation Sites (SOMERS): Integrated Systems-Based Approaches to Monitoring  

SciTech Connect (OSTI)

Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework.

Bunn, Amoret L.; Wellman, Dawn M.; Deeb, Rula A.; Hawley, Elizabeth L.; Truex, Michael J.; Peterson, Mark; Freshley, Mark D.; Pierce, Eric M.; McCord, John; Young, Michael H.; Gilmore, Tyler J.; Miller, Rick; Miracle, Ann L.; Kaback, Dawn; Eddy-Dilek, Carol; Rossabi, Joe; Lee, Michelle H.; Bush, Richard P.; Beam , Paul; Chamberlain, G. M.; Marble, Justin; Whitehurst, Latrincy; Gerdes, Kurt D.; Collazo, Yvette

2012-05-15T23:59:59.000Z

366

Towards the global monitoring of biodiversity change  

E-Print Network [OSTI]

at biodiversity conservation inside and outside protected areas [4­6] and at limiting the causes of biodiversityTowards the global monitoring of biodiversity change Henrique M. Pereira1,2,* and H. David Cooper3, Canada, H2Y1N9 Governments have set the ambitious target of reducing biodiversity loss by the year 2010

Pereira, Henrique Miguel

367

The Savannah River Site's groundwater monitoring program  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

Not Available

1991-10-18T23:59:59.000Z

368

Federal Radiological Monitoring and Assessment Center  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) policy, procedures, authorities, and requirements for the establishment of a Federal Radiological Monitoring and Assessment Center (FRMAC), as set forth in the Federal Radiological Emergency Response Plan (FRERP). This directive does not cancel another directive. Canceled by DOE O 153.1.

1992-12-02T23:59:59.000Z

369

Semantic Online Tourism Market Monitoring Norbert Walchhofera  

E-Print Network [OSTI]

Semantic Online Tourism Market Monitoring Norbert Walchhofera , Milan Hronskýa , Michael Poettlerb the functionality and utility of the approach in the domain of e-tourism, with a focus on the type of reports intelligence, domain model, e-tourism, data aggregation 1 Introduction In the Internet-based economy

370

Method and apparatus for monitoring machine performance  

DOE Patents [OSTI]

Machine operating conditions can be monitored by analyzing, in either the time or frequency domain, the spectral components of the motor current. Changes in the electric background noise, induced by mechanical variations in the machine, are correlated to changes in the operating parameters of the machine.

Smith, Stephen F. (Loudon, TN); Castleberry, Kimberly N. (Harriman, TN)

1996-01-01T23:59:59.000Z

371

OPTIMIZING PLACEMENT OF STATIONARY MONITORS ? 1 ...  

E-Print Network [OSTI]

(The terms monitors and sensors can be used interchangeably, although we .... An adversary can enter the area at any node (1,j) in the first column. ...... objective function is not ascending in our search direction at a stepsize of , and is...

2012-10-24T23:59:59.000Z

372

NON-STATIONARY CONDITION MONITORING THROUGH EVENT  

E-Print Network [OSTI]

in large diesel engines used for propulsion and power generation. Such operation involves frequent changes the technique for non-stationary condition monitoring of large diesel engines based on acoustical emission that cannot be separated from alarms originating from real faults. MAN B&W Diesel has conducted experiments

373

The Savannah River Site's Groundwater Monitoring Program  

SciTech Connect (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results.

Not Available

1992-08-03T23:59:59.000Z

374

Infrared system for monitoring movement of objects  

DOE Patents [OSTI]

A system for monitoring moving objects, such as the flight of honeybees and other insects, using a pulsed laser light source. This system has a self-powered micro-miniaturized transmitting unit powered, in the preferred embodiment, with an array solar cells. This transmitting unit is attached to the object to be monitored. These solar cells provide current to a storage energy capacitor to produce, for example, five volts for the operation of the transmitter. In the simplest embodiment, the voltage on the capacitor operates a pulse generator to provide a pulsed energizing signal to one or more very small laser diodes. The pulsed light is then received at a receiving base station using substantially standard means which converts the light to an electrical signal for processing in a microprocessor to create the information as to the movement of the object. In the case of a unit for monitoring honeybees and other insects, the transmitting unit weighs less than 50 mg, and has a size no larger than 1.times.3.times.5 millimeters. Also, the preferred embodiment provides for the coding of the light to uniquely identify the particular transmitting unit that is being monitored. A "wake-up" circuit is provided in the preferred embodiment whereby there is no transmission until the voltage on the capacitor has exceeded a pre-set threshold. Various other uses of the motion-detection system are described.

Valentine, Kenneth H. (San Diego, CA); Falter, Diedre D. (Knoxville, TN); Falter, Kelly G. (Knoxville, TN)

1991-01-01T23:59:59.000Z

375

Non-Seismic Geophysical Approaches to Monitoring  

SciTech Connect (OSTI)

This chapter considers the application of a number of different geophysical techniques for monitoring geologic sequestration of CO2. The relative merits of the seismic, gravity, electromagnetic (EM) and streaming potential (SP) geophysical techniques as monitoring tools are examined. An example of tilt measurements illustrates another potential monitoring technique, although it has not been studied to the extent of other techniques in this chapter. This work does not represent an exhaustive study, but rather demonstrates the capabilities of a number of geophysical techniques on two synthetic modeling scenarios. The first scenario represents combined CO2 enhance oil recovery (EOR) and sequestration in a producing oil field, the Schrader Bluff field on the north slope of Alaska, USA. The second scenario is of a pilot DOE CO2 sequestration experiment scheduled for summer 2004 in the Frio Brine Formation in South Texas, USA. Numerical flow simulations of the CO2 injection process for each case were converted to geophysical models using petrophysical models developed from well log data. These coupled flow simulation geophysical models allow comparrison of the performance of monitoring techniques over time on realistic 3D models by generating simulated responses at different times during the CO2 injection process. These time-lapse measurements are used to produce time-lapse changes in geophysical measurements that can be related to the movement of CO2 within the injection interval.

Hoversten, G.M.; Gasperikova, Erika

2004-09-01T23:59:59.000Z

376

Monitoring Energy Consumption In Wireless Sensor Networks  

E-Print Network [OSTI]

Monitoring Energy Consumption In Wireless Sensor Networks Matthias Witt, Christoph Weyer, it may impair the ability of the sensor network to function. Therefore, minimizing energy consumption energy consumption in both standby and active modes is the basis of wireless networks. Energy preserving

Turau, Volker

377

The `Virtual Hand' of Jihad Terrorism Monitor  

E-Print Network [OSTI]

The `Virtual Hand' of Jihad Terrorism Monitor Terrorism Focus Spotlight on Terror By Vol does Islam per se or "Muslim civilization" really have anything to do with terrorism ­ no more than massacre of 58 tourists http://www.jamestown.org/terrorism/news/article.php?articleid=2369701 (1 of 5) [5

Paris-Sud XI, Université de

378

Version Auteur Monitoring the International Standardization Process  

E-Print Network [OSTI]

Version Auteur Monitoring the International Standardization Process Theoretical Choices are materialized in standards. The main purpose is to design both a methodology and specific text mining tools to investigate these standards. These tools will be implemented in a platform designed to provide cartographic

Boyer, Edmond

379

Underground ventilation remote monitoring and control system  

SciTech Connect (OSTI)

This paper presents the design and installation of an underground ventilation remote monitoring and control system at the Waste Isolation Pilot Plant. This facility is designed to demonstrate safe underground disposal of U.S. defense generated transuranic nuclear waste. To improve the operability of the ventilation system, an underground remote monitoring and control system was designed and installed. The system consists of 15 air velocity sensors and 8 differential pressure sensors strategically located throughout the underground facility providing real-time data regarding the status of the ventilation system. In addition, a control system was installed on the main underground air regulators. The regulator control system gives indication of the regulator position and can be controlled either locally or remotely. The sensor output is displayed locally and at a central surface location through the site-wide Central Monitoring System (CMS). The CMS operator can review all sensor data and can remotely operate the main underground regulators. Furthermore, the Virtual Address Extension (VAX) network allows the ventilation engineer to retrieve real-time ventilation data on his personal computer located in his workstation. This paper describes the types of sensors selected, the installation of the instrumentation, and the initial operation of the remote monitoring system.

Strever, M.T.; Wallace, K.G. Jr.; McDaniel, K.H.

1995-12-31T23:59:59.000Z

380

SEISMIC INTERFEROMETRY FOR TEMPORAL MONITORING Norimitsu Nakata  

E-Print Network [OSTI]

SEISMIC INTERFEROMETRY FOR TEMPORAL MONITORING by Norimitsu Nakata #12;c Copyright by Norimitsu Seismic interferometry, where one computes coherency of waves between two or more receivers and averages from the first study related to seismic interferometry (although the name of seismic interferometry has

Snieder, Roel

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Geophysical Monitoring of Hydrological and Biogeochemical  

E-Print Network [OSTI]

explored the use of geophysical approaches for monitoring the spatiotemporal distribution of hydrological and biogeochemical transformations associated with a Cr(VI) bioremediation experiment performed at Hanford, WA. We: the spatial distribution of injected electron donor; the evolution of gas bubbles; variations in total

Hubbard, Susan

382

Design and analysis of environmental monitoring programs  

E-Print Network [OSTI]

Design and analysis of environmental monitoring programs Søren Lophaven Kongens Lyngby 2004 IMM­PHD­2004­138 #12; Technical University of Denmark Informatics and Mathematical Modelling Building 321, DK they could equally well be applied within areas such as soil and air pollution. #12; ii #12; Resum??e Denne Ph

383

Design and analysis of environmental monitoring programs  

E-Print Network [OSTI]

Design and analysis of environmental monitoring programs Søren Lophaven Kongens Lyngby 2004 IMM-PHD-2004-138 #12;Technical University of Denmark Informatics and Mathematical Modelling Building 321, DK they could equally well be applied within areas such as soil and air pollution. #12;ii #12;Resum´e Denne Ph

384

Brownsberg Nature Park RESEARCH & MONITORING PROGRAM  

E-Print Network [OSTI]

Brownsberg Nature Park ECOLOGICAL RESEARCH & MONITORING PROGRAM 2001-2006 Kelly A. Fitzgerald Bart in Suriname Research Department of STINASU, Stichting Natuurbehoud Suriname Cornelis Jongbawstraat 14, P.O. Box 12252, Paramaribo, SURINAME Phone (597) 427102 / 427103 Fax (597) 421850 Email research

Norconk, Marilyn A.

385

Remote quality monitoring in the banana chain  

Science Journals Connector (OSTI)

...bypassed the warehouse handling and directly transported...chain for bananas as applied in our field tests...prioritized for port handling. Palletloads which...development and monitoring technologies have to go hand...analyser; Control in applied Physiology (CP...i) Experimental procedure for banana storage...

2014-01-01T23:59:59.000Z

386

Improving the laboratory monitoring of absorbent oil  

SciTech Connect (OSTI)

The performance of absorbent coal tar oil is analyzed as a function of the constituent and group composition. The qualitative and quantitative composition of the oil that ensures the required absorbent properties is determined. Operative monitoring may be based on absorbent characteristics that permit regulation of the beginning and end of regeneration.

V.S. Shved; S.S. Sychev; I.V. Safina; S.A. Klykov [OAO Koks, Kemerovo (Russian Federation)

2009-05-15T23:59:59.000Z

387

Review article Automated monitoring of greenhouse crops  

E-Print Network [OSTI]

of the greenhouse. Most of these sensors, such as thermistors and light meters, are reli- able, inexpensive, readilyReview article Automated monitoring of greenhouse crops David L. EHRETa*, Anthony LAUb, Shabtai and continuously detect crop stress, water use, growth and nutrition in greenhouse crops. Some of these techniques

Boyer, Edmond

388

CALIFORNIA ENERGY Small HVAC Database Of Monitored  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION Small HVAC Database Of Monitored Information Database of Compiled of the Integrated Design of Small Commercial HVAC Systems research project. The reports are a result of funding: Productivity and Interior Environments Integrated Design of Large Commercial HVAC Systems Integrated Design

389

a Wireless Sensor Network for Environmental Monitoring  

E-Print Network [OSTI]

transmitters #12;Sample sensors: #12;Sample sensors: PAR: Photosynthetically Active (solar) Radiation sensora Wireless Sensor Network for Environmental Monitoring a Wireless Sensor Network for Environmental technology: a truly self configurable, low-cost, maintenance-free, ad-hoc sensor network (not based on Zig

Gburzynski, Pawel

390

Bacterial Monitoring for the Buck Creek Watershed  

E-Print Network [OSTI]

personnel to conduct this study. With the help and cooperation of the Texas AgriLife Research and Extension Center at Vernon, a work plan was developed to collect water samples and conduct water quality monitoring every other week at 13 different sites along...

391

Condition Monitoring and Management from Acoustic  

E-Print Network [OSTI]

is about condition monitoring of large diesel engines from acoustic emission signals. The experiments have been focused on a specific and severe fault called scuffing. The fault is generally assumed to arise of this work is the analysis of the angular position changes of the engine related events such as fuel

392

Infrared system for monitoring movement of objects  

DOE Patents [OSTI]

A system is described for monitoring moving objects, such as the flight of honeybees and other insects, using a pulsed laser light source. This system has a self-powered micro-miniaturized transmitting unit powered, in the preferred embodiment, with an array of solar cells. This transmitting unit is attached to the object to be monitored. These solar cells provide current to a storage energy capacitor to produce, for example, five volts for the operation of the transmitter. In the simplest embodiment, the voltage on the capacitor operates a pulse generator to provide a pulsed energizing signal to one or more very small laser diodes. The pulsed light is then received at a receiving base station using substantially standard means which converts the light to an electrical signal for processing in a microprocessor to create the information as to the movement of the object. In the case of a unit for monitoring honeybees and other insects, the transmitting unit weighs less than 50 mg, and has a size no larger than 1[times]3[times]5 millimeters. Also, the preferred embodiment provides for the coding of the light to uniquely identify the particular transmitting unit that is being monitored. A wake-up' circuit is provided in the preferred embodiment whereby there is no transmission until the voltage on the capacitor has exceeded a pre-set threshold. Various other uses of the motion-detection system are described. 4 figures.

Valentine, K.H.; Falter, D.D.; Falter, K.G.

1991-04-30T23:59:59.000Z

393

EFFECTIVE STRUCTURAL HEALTH MONITORING WITH ADDITIVE MANUFACTURING  

E-Print Network [OSTI]

will be presented for components that can be processed by additive manufacturing (AM) or 3D printing. The origin structures. KEYWORDS : structural health monitoring methodology, 3D printing, additive manufacturing, fatigue, intelligent structure INTRODUCTION Additive manufacturing (AM), also known as 3D Printing or Rapid

Boyer, Edmond

394

Energy Monitoring of Software project-team  

E-Print Network [OSTI]

Energy Monitoring of Software Systems project-team Romain Rouvoy Aurélien Bourdon Adel Noureddine Lionel Seinturier firstname.lastname@inria.fr #12;ICT & Energy 2% of the global energy consumption in 2007 [1] [1] Gartner #12;ICT & Energy [1] 2008 ICT report, Ecology Ministry 13.5% of the electricity

Lefèvre, Laurent

395

HELIUM COMPRESSOR MONITORING SYSTEM Donna Kubik  

E-Print Network [OSTI]

for Phaseloss Detection Lambda +15V Power Supply Distribution Remote Control of 120VC to Compressor Monitoring compressor supply pressure · Display compressor return pressure · Display compressor motor temperature-defined limits · Check if temperature has exceeded user-defined limits · Detect and display minimum supply

396

Robotic Platform for Monitoring Underground Cable Systems  

E-Print Network [OSTI]

. to traverse and monitor fiber-optic overhead ground transmission wires (OPGW) above 66kV power transmission-operation via a LAN or Internet connection. A prototype platform has been developed and tested with a 14kV in Japan to inspect the power transmission lines in 1991 [6]. The robot could maneuver around obstructions

Mamishev, Alexander

397

Range Monitoring with Photo-points  

E-Print Network [OSTI]

Photo-points provide a way for owners/managers to monitor rangeland health with a minimum of time and expense. This publication explains when, where and how often to photograph rangeland points, how to set up a photo point, and how to interpret...

McGinty, Allan; White, Larry D.

1998-08-31T23:59:59.000Z

398

Biomedical Monitoring of Non-Hospitalized Subjects  

E-Print Network [OSTI]

Biomedical Monitoring of Non-Hospitalized Subjects using Disruption-Tolerant Wireless Sensors for the collection of biomedical data produced by sensors carried by mobile non-hospitalized subjects. In this paper we investigate the possibility of using these many hotspots as gateways for biomedical data

Paris-Sud XI, Université de

399

Deep Web Entity Monitoring Mohammadreza Khelghati  

E-Print Network [OSTI]

Deep Web Entity Monitoring Mohammadreza Khelghati Database Group University of Twente, Netherlands. This data is defined as hidden web or deep web which is not accessible through search engines. It is estimated that deep web contains data in a scale several times bigger than the data accessible through

Hiemstra, Djoerd

400

Survey your options: Continuous emissions monitoring  

SciTech Connect (OSTI)

In the US the public`s growing concern for air quality over the last twenty-five years has led to a complex patchwork of federal, state and local regulations aimed at controlling the emissions of pollutants from manufacturing facilities, power plants and municipal waste-incineration facilities. Like a shadow on the heels of a sprinter, the continuous emissions monitoring (CEM) industry has developed as a direct result of these regulations. In just two and a half decades, the CEM market has grown from a few specialized instrument firms to a billion-dollar business today--a remarkable feat considering there were few true CEM systems in existence prior to the enactment of the original US Clean Air Act of 1970. Despite the emergence of so many vendors offering so many different monitoring techniques, operators still face a host of complex issues when trying to select the right CEM. For facilities operating in today`s competitive, highly regulated environment, cost and performance pressures are stronger than ever. These pressures have forced CEM developers toward innovation to improve performance while containing capital and plant operating costs. This article provides an overview of the current status of CEM systems, and provides a glimpse at some of the new developments that will affect future monitoring configurations. Noteworthy new techniques include continuous emissions monitoring using Fourier Transform Infrared (FTIR) analyzers, laser-based opacity monitors, and the growing use of software-based, predictive CEMs. Also discussed is a new approach that overcomes the problems associated with measuring SO{sub 2} in fluegas streams downstream of NOx-reduction systems that use ammonia or urea injection.

White, J.R. [KVB/Analect, Irvine, CA (United States)

1995-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Monitoring, Verification and Reporting: Improving Compliance Within Energy  

Open Energy Info (EERE)

Monitoring, Verification and Reporting: Improving Compliance Within Energy Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Jump to: navigation, search Tool Summary Name: Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Agency/Company /Organization: International Energy Agency Sector: Energy Focus Area: Energy Efficiency Topics: GHG inventory, Policies/deployment programs Resource Type: Guide/manual Website: www.iea.org/papers/pathways/monitoring.pdf Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs Screenshot References: Monitoring, Verification and Reporting: Improving Compliance Within Energy Efficient Programs[1] This document includes: A brief overview of MVE in the context of S&L programmes.

402

Systems/Process Monitoring, Diagnostics and Control - Nuclear Engineering  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Capabilities > Nuclear Systems Capabilities > Nuclear Systems Technologies > Systems/Process Monitoring, Diagnostics and Control Capabilities Nuclear Systems Technologies Nuclear Criticality Safety Research Reactor Analysis Decontamination and Decommissioning Systems/Process Monitoring, Diagnostics and Control Overview Process Monitoring & Signal Validation Diagnostic & Advisory Systems Advanced (AI-based) Nonlinear Controllers for Industrial Processes Artificial intelligence Other Capabilities Work with Argonne Contact us For Employees Site Map Help Systems/Process Monitoring, Diagnostics and Control Bookmark and Share Systems/Process Monitoring, Diagnostics and Control Systems/Process Monitoring, Diagnostics and Control. Click on image to view larger image. The goal of the Nuclear Engineering Division's research on advanced

403

Introduction to continuous emission monitoring programs. Final report  

SciTech Connect (OSTI)

This document provides a general introduction to continuous emission monitoring for those persons not previously involved in this field. Information is presented on continuous opacity monitoring, as well as instrumental and alternative monitoring techniques for SO2 and NOx (i.e., continuous wet-chemical measurement methods and fuel sampling and analysis methods). This document presents an outline and review of the fundamental concepts, terminology, and procedures used in a continuous emission monitoring program. Also presented are selected technical details necessary to understand the operation of emission monitors, the use of continuous emission monitoring data by air pollution control agencies, and references to other available documents which provide additional information.

Peeler, J.W.

1983-01-01T23:59:59.000Z

404

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement the requirements of this program plan, are also referenced. The DOE regulates its own activities for radiation protection of the public under the authority of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011). The effluent and environmental monitoring activities prescribed by DOE Order 5400.5 and the DOE/EH-0173T guidance manual are designed to ensure that DOE facilities implement standards and regulations to protect members of the public and the environment against undue risk from radiation. Effluent and environmental monitoring also provide 1999 Environmental Monitoring Plan DOE/WIPP 99-2194 the data necessary to demonstrate compliance with applicable environmental protection regulations. Other federal agencies, such as the U.S. Environmental Protection Agency (EPA), are empowered through specific legislation to regulate certain aspects of DOE activities potentially affecting public health and safety or the environment. Presidential Executive Order 12088, Federal Compliance with Pollution Control Standards (43 FR 47707), requires the heads of executive agencies to ensure that all federal facilities and activities comply with applicable pollution control standards and to take all necessary actions for the prevention, control, and abatement of environmental pollution. Beyond statutory requirements, the DOE has established a general environmental protection policy. The Environmental Policy Statement (issued by then Secretary Herrington on January 8, 1986, and extended on January 7, 1987) describes the DOE's commitment to national environmental protection goals in that it conducts operations ''in an environmentally safe and sound manner . . . in compliance with the letter and spirit of applicable environmental statutes, regulations, and standards'' (DOE, 1986). This Environmental Policy Statement also states the DOE's commitment to ''good environmental management in all of its programs and at all of its facilities in order to correct existing environmental problems, to minimize risks to the environment or public health, and to anticipate and address pote

Westinghouse Electric Company Waste Isolation Division

1999-09-29T23:59:59.000Z

405

Video Monitoring of River Herring in Coastal Massachusetts StreaVideo Monitoring of River Herring in Coastal Massachusetts Streamsms 1. Introduction1. Introduction  

E-Print Network [OSTI]

Video Monitoring of River Herring in Coastal Massachusetts StreaVideo Monitoring of River Herring Questions A. How does a video monitoring system work? B. Why is video monitoring a practical tool? C. What maintenance? D. What information can be gained from video monitoring? E. How can video monitoring be used

Schweik, Charles M.

406

Novel monitoring system to diagnose rail track foundation problems  

E-Print Network [OSTI]

A low cost, remote monitoring system has been developed to diagnose rail track subgrade failures. The portable monitoring system consists of five liquid vertical settlement probes, one piezometer, a small data acquisition ...

Aw, Eng Sew, 1978-

2004-01-01T23:59:59.000Z

407

Energy Monitoring--The State of the Art  

E-Print Network [OSTI]

In the past decade, energy monitoring has become an invaluable part of energy conservation programs. A fully implemented and effective monitoring program provides management with the assurance that all other elements of their energy management...

Rusnak, J. J.; McEver, R.; Dragoo, W.

408

Using Subjective Confidence to Improve Metacognitive Monitoring Accuracy and Control  

E-Print Network [OSTI]

are known as monitoring and control respectively. The relationship between accurate monitoring and improved control and performance has been borne out in multiple research studies. Unfortunately, people's metacognitive judgments are far from perfect; for low...

Miller, Tyler

2012-10-19T23:59:59.000Z

409

An International Haze-Monitoring Network for Students  

Science Journals Connector (OSTI)

The Global Learning and Observations to Benefit the Environment (GLOBE) Program is an international network of schools in 71 countries that monitors up to 20 environmental parameters. Recently GLOBE added a haze-monitoring program to its ...

Forrest M. Mims III

1999-07-01T23:59:59.000Z

410

Hydrothermal monitoring data from the Cascade Range, northwestern United States  

E-Print Network [OSTI]

Hydrothermal monitoring data from the Cascade Range, northwestern United States By S.E. Ingebritsen., and Evans, W.C., 2014, Hydrothermal monitoring data from the Cascade Range, northwestern United States: U ...................................................................................................................................27 (8) Carbonate springs

411

Farmland Mapping and Monitoring Program | Open Energy Information  

Open Energy Info (EERE)

Monitoring Program Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Farmland Mapping and Monitoring ProgramLegal Abstract California...

412

Nanoparticle-based Monitoring of Stem Cell Therapy  

E-Print Network [OSTI]

M, Ankrum JA, et al. Nanoparticle-based monitoring of cell10.7150/thno.7020 Editorial Nanoparticle-based Monitoring ofcell tracking with the nanoparticle-based contrast agents.

Xu, Chenjie; Zhao, Weian

2013-01-01T23:59:59.000Z

413

Design and implementation of a prototype generator monitoring system  

E-Print Network [OSTI]

protective relays, circuit breakers, and switches. Based on this data, the system performs continuous monitoring of the electrical part of the generator and informs operators of any deviations from the normal operating conditions. The monitoring involves...

Sun, Jianyong

2012-06-07T23:59:59.000Z

414

Statistical Methods for Environmental Pollution Monitoring  

Office of Scientific and Technical Information (OSTI)

f!\Jl~~ If & &0 f!\Jl~~ If & &0 :3 Statistical Methods for Environmental Pollution Monitoring 3 3679 00058 9400 Statistical Methods for Environmental Pollution Monitoring Richard O. Gilbert Pacific Northwest Laboratory Imi5l VAN NOSTRAND REINHOLD COMPANY ~ - - - - - - - New York Dedicated to my parents, Mary Margaret and Donald I. Gilbert Copyright © 1987 by Van Nostrand Reinhold Company Inc. Library of Congress Catalog Card Number: 86-26758 ISBN 0-442-23050-8 Work supported by the U.S. Department of Energy under Contract No. DE-AC06-76RLOI830. All rights reserved. No part of this work covered by the copyright hereon may be reproduced or used in any form or by any means-graphic, electronic, or mechanical, including photocopying, recording, taping, or

415

Monitoring of HPWH for Multifamily Applications  

Broader source: Energy.gov (indexed) [DOE]

Davis Energy Group | 4/30/2013 Davis Energy Group | 4/30/2013 Monitoring of HPWH for Multifamily Applications Building America Technical Update Meeting April 30 th 2013 ‹#› Davis Energy Group | 4/30/2013 Context * Heat Pump Water Heaters have the potential for 50+% energy savings over conventional electric storage heaters * Gaps - Little data available on Multi-Family applications of HPWH - Field testing of single-family HPWHs have shown lower than rated performance due to a range of factors * Target Questions - How does the unit compare with manufacturers claim? - How well does the unit meet the loads? - How viable are HPWH's to other conventional options? ‹#› Davis Energy Group | 4/30/2013 Technical Approach * Monitoring - Installed at UC Davis West Village ZNE Community as part of

416

Microfabricated fuel heating value monitoring device  

DOE Patents [OSTI]

A microfabricated fuel heating value monitoring device comprises a microfabricated gas chromatography column in combination with a catalytic microcalorimeter. The microcalorimeter can comprise a reference thermal conductivity sensor to provide diagnostics and surety. Using microfabrication techniques, the device can be manufactured in production quantities at a low per-unit cost. The microfabricated fuel heating value monitoring device enables continuous calorimetric determination of the heating value of natural gas with a 1 minute analysis time and 1.5 minute cycle time using air as a carrier gas. This device has applications in remote natural gas mining stations, pipeline switching and metering stations, turbine generators, and other industrial user sites. For gas pipelines, the device can improve gas quality during transfer and blending, and provide accurate financial accounting. For industrial end users, the device can provide continuous feedback of physical gas properties to improve combustion efficiency during use.

Robinson, Alex L. (Albuquerque, NM); Manginell, Ronald P. (Albuquerque, NM); Moorman, Matthew W. (Albuquerque, NM)

2010-05-04T23:59:59.000Z

417

Portsmouth X300 remote assay monitor system  

SciTech Connect (OSTI)

Personnel in the Instrumentation and Controls Division at Oak Ridge National Laboratory (ORNL) in association with the United States Enrichment Corporation (USEC) have recently developed a system for monitoring and tracking the assay of enriched uranium from the production facilities at the Portsmouth Gaseous Diffusion Plant (PORTS). This work was sponsored by the USEC and has involved the expansion and improvement of an existing system that was developed by ORNL. The system provides control room operators with real-time information on the withdrawal operations of uranium hexafluoride at the withdrawal stations at PORTS. An additional system was developed to display the real-time information from each of the three withdrawal stations at a remotely located building. This report describes the remote assay monitor and display system that has been developed and installed at PORTS Building X300.

Smith, D.E.

1996-07-01T23:59:59.000Z

418

Structural integrity monitoring of an offshore platform  

SciTech Connect (OSTI)

The purpose of this study is to examine the possibility of detecting changes in the structural response of an offshore platform due to damage. The Vega A eight-legs steel platform presently operating in the Sicily Channel is examined, with the help of a system of vibration monitoring. In the paper, changes of the structural response due to the collapse of nodes in the deeper part of the jacket are evaluated numerically with respect to the undamaged behavior, and the feasibility of the monitoring system to detect such changes is examined. An attempt is made in order to detect also the location of the damage through the examination of shifts in the first natural frequencies.

Chiostrini, S.; Vignoli, A. [Univ. of Florence (Italy)

1994-12-31T23:59:59.000Z

419

Diagnostic monitor for carbon fiber processing  

DOE Patents [OSTI]

A method for monitoring characteristics of materials includes placing a material in an application zone, measuring a change in at least one property value of the application zone caused by placing the material in the application zone and relating changes in the property value of the application zone caused by the material to at least one characteristic of the material An apparatus for monitoring characteristics of a material includes a measuring device for measuring a property value resulting from applying a frequency signal to the application zone after placing a material in the application zone and a processor for relating changes in the property value caused by placement of the material in the application zone to at least one desired characteristic of the material. The application zone is preferably a resonant cavity.

Paulauskas, Felix L. (Knoxville, TN); Bigelow, Timothy S. (Knoxville, TN); Meek, Thomas T. (Knoxville, TN)

2002-01-01T23:59:59.000Z

420

Monitoring transients in low inductance circuits  

DOE Patents [OSTI]

A pair of flat cable transmission lines are monitored for transient current spikes by using a probe connected to a current transformer by a pickup loop and monitoring the output of the current transformer. The approach utilizes a U-shaped pickup probe wherein the pair of flat cable transmission lines are received between the legs of the U-shaped probe. The U-shaped probe is preferably formed of a flat coil conductor adhered to one side of a flexible substrate. On the other side of the flexible substrate there is a copper foil shield. The copper foil shield is connected to one end of the flat conductor coil and connected to one leg of the pickup loop which passes through the current transformer. The other end of the flat conductor coil is connected to the other leg of the pickup loop.

Guilford, Richard P. (Albuquerque, NM); Rosborough, John R. (Albuquerque, NM)

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

CESP Tool 9.1: Monitoring Plan Template  

Broader source: Energy.gov [DOE]

CESP Tool 9.1: Monitoring Plan Template from Step 9: Plan to Elevate, Guide to Community Energy Strategic Planning.

422

Operating Experience Review of the INL HTE Gas Monitoring System  

SciTech Connect (OSTI)

This paper describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored at hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and unwanted alarms are described. The calibration session time durations are described. Some simple statistics are given for the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

L. C. Cadwallader; K. G. DeWall

2010-06-01T23:59:59.000Z

423

Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996  

SciTech Connect (OSTI)

As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

Naidu, J.R.; Paquette, D.; Lee, R. [and others

1996-10-01T23:59:59.000Z

424

Load Allocation Through Detailed Simulation Calibrated with Monitored Data  

E-Print Network [OSTI]

, the only solution would be to monitor the energy channels within the buildings (monitoring the main building meters as a minimum). A real problem that is often associated with institutional buildings (university and hospital campuses) is that two... answer to the load allocation can only be answered by monitoring every energy channel in the building which proves to be very costly. A cost-effective solution was used where the monitoring plan covers the main three meters in the building under...

Abushakra, B.

2005-01-01T23:59:59.000Z

425

Real Time Monitoring: Achieving Energy Efficiency  

E-Print Network [OSTI]

ABSTRACT: IECBO?s International Conference for Enhanced Building Operations November 17-18, 2009 Austin, Texas. Energy @ Work www.Energy-Efficiency.com File: Rouse_ Abstract Contact: scott.rouse@energy-efficiency....com, (416) 402-0525 Proposal Type: o Electronic proposal for presentation Title of Paper: o Real Time Monitoring: Achieving Energy Efficiency! Conference: o ICEBO?s International Conference for Enhanced Building Operations Submitted by: o...

Rouse, S.

426

Verifiable process monitoring through enhanced data authentication.  

SciTech Connect (OSTI)

To ensure the peaceful intent for production and processing of nuclear fuel, verifiable process monitoring of the fuel production cycle is required. As part of a U.S. Department of Energy (DOE)-EURATOM collaboration in the field of international nuclear safeguards, the DOE Sandia National Laboratories (SNL), the European Commission Joint Research Centre (JRC) and Directorate General-Energy (DG-ENER) developed and demonstrated a new concept in process monitoring, enabling the use of operator process information by branching a second, authenticated data stream to the Safeguards inspectorate. This information would be complementary to independent safeguards data, improving the understanding of the plant's operation. The concept is called the Enhanced Data Authentication System (EDAS). EDAS transparently captures, authenticates, and encrypts communication data that is transmitted between operator control computers and connected analytical equipment utilized in nuclear processes controls. The intent is to capture information as close to the sensor point as possible to assure the highest possible confidence in the branched data. Data must be collected transparently by the EDAS: Operator processes should not be altered or disrupted by the insertion of the EDAS as a monitoring system for safeguards. EDAS employs public key authentication providing 'jointly verifiable' data and private key encryption for confidentiality. Timestamps and data source are also added to the collected data for analysis. The core of the system hardware is in a security enclosure with both active and passive tamper indication. Further, the system has the ability to monitor seals or other security devices in close proximity. This paper will discuss the EDAS concept, recent technical developments, intended application philosophy and the planned future progression of this system.

Goncalves, Joao G. M. (European Commission Joint Research Centre, Italy); Schwalbach, Peter (European Commission Directorate General%3CU%2B2014%3EEnergy, Luxemburg); Schoeneman, Barry Dale; Ross, Troy D.; Baldwin, George Thomas

2010-09-01T23:59:59.000Z

427

INSITE: An emerging standard for substation monitoring  

SciTech Connect (OSTI)

The functions of the INSITE Substation Apparatus Monitoring System can be broken into two, somewhat arbitrary categories. (1) Data acquisition, storage and communications, (2) Data analysis and apparatus condition assessment. We have defined the first set of functions as comprising the {open_quotes}platform{close_quotes}, the second as an {open_quotes}application{close_quotes}. We have made the distinction to encourage users to contemplate other possible {open_quotes}applications{close_quotes} which may be implemented using the platform. The intent of this paper is to describe in detail the platform functions. The requirements for the platform derive from several overall goals of a substation apparatus monitoring system: (1) Comprehensive: The ability to monitor all important types of substation apparatus, combined with all the tools - the sensors, the Data Acquisition Unit, and the analysis and communications software - for an on-line, real-time condition assessment of your equipment, with critical information at everyone`s fingertips. (2) Dependable: Built-in self-diagnosis that assures optimum system performance. (3) Reliable: From an extremely hot to extremely cold environment, capable of functioning reliably in electrically noisy substations. (4) Expandable: Easily upgradable to accommodate additional sensors available today and any new types developed tomorrow - as well as new software, for monitoring other equipment down the road. (5) Open: The ability to accept non-Doble supplied sensors - with future capability for integrating RS-232-compatible intelligent sensors. (6) Complementary: Compatibility with existing DTA technology, for example, making comparison of both out-of-service and in-service data possible. (7) Easy-to-Use: A Windows application with user-friendly pull-down menus, simple icons and buttons, and dialog sessions that can be mastered easily. On-line Help is also available. (8) Lowest possible cost.

Woodward, R.C. [Doble Engineering Company, Watertown, MA (United States)

1996-03-01T23:59:59.000Z

428

Monitoring of FR Cnc Flaring Activity  

E-Print Network [OSTI]

Being excited by the detection of the first ever-observed optical flare in FR Cnc, we decided to continue photometrical monitoring of this object. The observations were carried out at Crimean Astrophysical Observatory (Crimea, Ukraine; CrAO - hereafter) and at the Terskol Observatory (Russia, Northern Caucasus). The obtained lightcurves are presented and discussed. No distinguishable flares were detected that could imply that flares on FR Cnc are very rare event.

A. Golovin; M. Andreev; E. Pavlenko; Yu. Kuznyetsova; V. Krushevska; A. Sergeev

2007-12-10T23:59:59.000Z

429

Electrical condition monitoring method for polymers  

DOE Patents [OSTI]

An electrical condition monitoring method utilizes measurement of electrical resistivity of an age sensor made of a conductive matrix or composite disposed in a polymeric structure such as an electrical cable. The conductive matrix comprises a base polymer and conductive filler. The method includes communicating the resistivity to a measuring instrument and correlating resistivity of the conductive matrix of the polymeric structure with resistivity of an accelerated-aged conductive composite.

Watkins, Jr., Kenneth S. (Dahlonega, GA); Morris, Shelby J. (Hampton, VA); Masakowski, Daniel D. (Worcester, MA); Wong, Ching Ping (Duluth, GA); Luo, Shijian (Boise, ID)

2008-08-19T23:59:59.000Z

430

ULTRA SECURE HIGH RELIABILITY WIRELESS RADIATION MONITOR  

SciTech Connect (OSTI)

Radiation monitoring in nuclear facilities is essential to safe operation of the equipment as well as protecting personnel. In specific, typical air monitoring of radioactive gases or particulate involves complex systems of valves, pumps, piping and electronics. The challenge is to measure a representative sample in areas that are radioactively contaminated. Running cables and piping to these locations is very expensive due to the containment requirements. Penetration into and out of an airborne or containment area is complex and costly. The process rooms are built with thick rebar-enforced concrete walls with glove box containment chambers inside. Figure 1 shows high temperature radiation resistance cabling entering the top of a typical glove box. In some case, the entire processing area must be contained in a 'hot cell' where the only access into the chamber is via manipulators. An example is shown in Figure 2. A short range wireless network provides an ideal communication link for transmitting the data from the radiation sensor to a 'clean area', or area absent of any radiation fields or radioactive contamination. Radiation monitoring systems that protect personnel and equipment must meet stringent codes and standards due to the consequences of failure. At first glance a wired system would seem more desirable. Concerns with wireless communication include latency, jamming, spoofing, man in the middle attacks, and hacking. The Department of Energy's Savannah River National Laboratory (SRNL) has developed a prototype wireless radiation air monitoring system that address many of the concerns with wireless and allows quick deployment in radiation and contamination areas. It is stand alone and only requires a standard 120 VAC, 60 Hz power source. It is designed to be mounted or portable. The wireless link uses a National Security Agency (NSA) Suite B compliant wireless network from Fortress Technologies that is considered robust enough to be used for classified data transmission in place of NSA Type 1 devices.

Cordaro, J.; Shull, D.; Farrar, M.; Reeves, G.

2011-08-03T23:59:59.000Z

431

Thermal Monitoring Approaches for Energy Savings Verification  

E-Print Network [OSTI]

methodology to guide the installation of insertion-type flow meters. The composition of pipe insulation can be a significant issue that affects the installation of Bm metering systems. Asbestos is common in older pipe insulation and the likelihood is high... that asbestos will be present in pipe insulation in buildings constructed prior to the late 1970's. The presence of asbestos must be determined prior to any disturbance of the installation. If asbestos is present, it must be abated before any monitoring...

McBride, J. R.; Bohmer, C. J.; Lippman, R. H.; Zern, M. J.

432

Radionuclide Sensors for Subsurface Water Monitoring  

SciTech Connect (OSTI)

Contamination of the subsurface by radionuclides is a persistent and vexing problem for the Department of Energy. These radionuclides must be measured in field studies and monitoed in the long term when they cannot be removed. However, no radionuclide sensors existed for groundwater monitoring prior to this team's research under the EMSP program Detection of a and b decays from radionuclides in water is difficult due to their short ranges in condensed media.

Timothy DeVol

2006-06-30T23:59:59.000Z

433

Regenerable activated bauxite adsorbent alkali monitor probe  

DOE Patents [OSTI]

A regenerable activated bauxite adsorber alkali monitor probe for field applications to provide reliable measurement of alkali-vapor concentration in combustion gas with special emphasis on pressurized fluidized-bed combustion (PFBC) off-gas. More particularly, the invention relates to the development of a easily regenerable bauxite adsorbent for use in a method to accurately determine the alkali-vapor content of PFBC exhaust gases. 6 figs.

Lee, S.H.D.

1992-12-22T23:59:59.000Z

434

November 2007 monitoring results for Barnes, Kansas.  

SciTech Connect (OSTI)

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) formerly operated a grain storage facility (during most of the interval 1949-1974) at Barnes, Kansas. Carbon tetrachloride contamination was initially detected in 1986 in the town's public water supply wells. In 2006-2007, the CCC/USDA conducted a comprehensive targeted investigation at and near its former property in Barnes to investigate this contamination. In November 2007, the CCC/USDA began quarterly groundwater monitoring at Barnes. The monitoring is being conducted on behalf of the CCC/USDA by Argonne National Laboratory, in accord with the recommendations made in the report for the 2006-2007 targeted investigation (Argonne 2007). The objective is to monitor the carbon tetrachloride contamination identified in the groundwater at Barnes. The sampling is presently conducted in a network of 28 individual monitoring wells at 19 distinct locations, 2 public water supply wells, and 1 private well (Figure 1.1). The results of the 2006-2007 targeted investigation demonstrated the presence of carbon tetrachloride contamination at levels slightly exceeding the Kansas Department of Health and Environment (KDHE) Tier 2 risk-based screening level of 5.0 {micro}g/L for this compound, in a plume that appears to extend from the former CCC/USDA property northwestward, toward the Barnes public water supply wells. Information obtained during the 2006-2007 investigation indicates that at least one other potential source might have contributed to the groundwater contaminant plume (Argonne 2007). The present report presents the results of the November 2007 sampling event that followed the targeted investigation.

LaFreniere, L. M.; Environmental Science Division

2008-02-28T23:59:59.000Z

435

Method and apparatus for monitoring aircraft components  

DOE Patents [OSTI]

Operability of aircraft mechanical components is monitored by analyzing the voltage output of an electrical generator of the aircraft. Alternative generators, for a turbine-driven rotor aircraft, include the gas producer turbine tachometer generator, the power turbine tachometer generator, and the aircraft systems power producing starter/generator. Changes in the peak amplitudes of the fundamental frequency and its harmonics are correlated to changes in condition of the mechanical components.

Dickens, Larry M. (Oak Ridge, TN); Haynes, Howard D. (Knoxville, TN); Ayers, Curtis W. (Clinton, TN)

1996-01-01T23:59:59.000Z

436

Method and apparatus for monitoring aircraft components  

DOE Patents [OSTI]

Operability of aircraft mechanical components is monitored by analyzing the voltage output of an electrical generator of the aircraft. Alternative generators, for a turbine-driven rotor aircraft, include the gas producer turbine tachometer generator, the power turbine tachometer generator, and the aircraft systems power producing starter/generator. Changes in the peak amplitudes of the fundamental frequency and its harmonics are correlated to changes in condition of the mechanical components. 14 figs.

Dickens, L.M.; Haynes, H.D.; Ayers, C.W.

1996-01-16T23:59:59.000Z

437

The Straightness Monitor System at ATF2  

SciTech Connect (OSTI)

The demonstration of absolute stability of the position of the focused beam is the primary goal of the ATF2 commissioning effort. We have installed a laser interferometer system that will eventually correct the measurement of high-precision Beam Position Monitors used in the ATF2Final Focus Steering Feedback for mechanical motion or vibrations. Here, we describe the installed system and present preliminary data on the short- and long-term mechanical stability of the BPM system.

Hildreth, Michael; /Notre Dame U.; Aryshev, Alexander; /Royal Holloway, U. of London; Boogert, Stewart; /Oxford U., JAI; Honda, Yosuke; /KEK, Tsukuba; Tauchi, Toshiaki; /KEK, Tsukuba; Terunuma, Nobuhiro; /KEK, Tsukuba; White, Glen; /SLAC

2012-07-06T23:59:59.000Z

438

Evaluation of a multiport groundwater monitoring system  

SciTech Connect (OSTI)

In 1988 and 1989, Pacific Northwest Laboratory installed a multiport groundwater monitoring system in two wells on the Hanford Site: one near the 216-B-3 Pond in the center of the Hanford Site and one just north of the 300 Area near the Columbia River. The system was installed to provide the US Department of Energy with needed three-dimensional data on the vertical distribution of contaminants and hydraulic heads on the Hanford Site. This study evaluates the ability of the multiport system to obtain hydrogeologic data at multiple points vertically in a single borehole, and addresses the representativeness of the data. Data collected from the two wells indicate that the multiport system is well suited for groundwater monitoring networks requiring three-dimensional characterization of the hydrogeologic system. A network of these systems could provide valuable information on the hydrogeologic environment. However, the advantages of the multiport system diminish when the system is applied to long-term monitoring networks (30+ years) and to deeper wells (<300 ft). For shallow wells, the multiport system provides data in a cost-effective manner that would not be reasonably obtainable with the conventional methods currently in use at the Hanford Site. 17 refs., 28 figs., 6 tabs.

Gilmore, T.J.; Hall, S.H.; Olsen, K.B.; Spane, F.A. Jr.

1991-03-01T23:59:59.000Z

439

Fission Product Ratios as Treaty Monitoring Discriminants  

SciTech Connect (OSTI)

The International Monitoring System (IMS) of the Comprehensive Test Ban Treaty Organization (CTBTO) is currently under construction. The IMS is intended for monitoring of nuclear explosions. The radionuclide branch of the IMS monitors the atmosphere for short-lived radioisotopes indicative of a nuclear weapon test, and includes field collection and measurement stations, as well as laboratories to provide reanalysis of the most important samples and a quality control function. The Pacific Northwest National Laboratory in Richland, Washington hosts the United States IMS laboratory, with the designation RL16. Since acute reactor containment failures and chronic reactor leakage may also produce similar isotopes, it is tempting to compute ratios of detected isotopes to determine the relevance of an event to the treaty or agreement in question. In this paper we will note several shortcomings of simple isotopic ratios: (1) fractionation of different chemical species, (2) difficulty in comparing isotopes within a single element, (3) the effect of unknown decay times. While these shortcomings will be shown in the light of an aerosol sample, several of the problems extend to xenon isotopic ratios. The result of the difficulties listed above is that considerable human expertise will be required to convert a simple mathematical ratio into a criterion which will reliably categorize an event as reactor or weapon.

Miley, Harry S.; Bowyer, Ted W.; Greenwood, Lawrence R.; Arthur, Richard J.

2008-05-15T23:59:59.000Z

440

A design methodology for unattended monitoring systems  

SciTech Connect (OSTI)

The authors presented a high-level methodology for the design of unattended monitoring systems, focusing on a system to detect diversion of nuclear materials from a storage facility. The methodology is composed of seven, interrelated analyses: Facility Analysis, Vulnerability Analysis, Threat Assessment, Scenario Assessment, Design Analysis, Conceptual Design, and Performance Assessment. The design of the monitoring system is iteratively improved until it meets a set of pre-established performance criteria. The methodology presented here is based on other, well-established system analysis methodologies and hence they believe it can be adapted to other verification or compliance applications. In order to make this approach more generic, however, there needs to be more work on techniques for establishing evaluation criteria and associated performance metrics. They found that defining general-purpose evaluation criteria for verifying compliance with international agreements was a significant undertaking in itself. They finally focused on diversion of nuclear material in order to simplify the problem so that they could work out an overall approach for the design methodology. However, general guidelines for the development of evaluation criteria are critical for a general-purpose methodology. A poor choice in evaluation criteria could result in a monitoring system design that solves the wrong problem.

SMITH,JAMES D.; DELAND,SHARON M.

2000-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Continuous Air Monitor Operating Experience Review  

SciTech Connect (OSTI)

Continuous air monitors (CAMs) are used to sense radioactive particulates in room air of nuclear facilities. CAMs alert personnel of potential inhalation exposures to radionuclides and can also actuate room ventilation isolation for public and environmental protection. This paper presents the results of a CAM operating experience review of the DOE Occurrence Reporting and Processing System (ORPS) database from the past 18 years. Regulations regarding these monitors are briefly reviewed. CAM location selection and operation are briefly discussed. Operating experiences reported by the U.S. Department of Energy and in other literature sources were reviewed to determine the strengths and weaknesses of these monitors. Power losses, human errors, and mechanical issues cause the majority of failures. The average all modes failure rate is 2.65E-05/hr. Repair time estimates vary from an average repair time of 9 hours (with spare parts on hand) to 252 hours (without spare parts on hand). These data should support the use of CAMs in any nuclear facility, including the National Ignition Facility and the international ITER experiment.

L. C. Cadwallader; S. A. Bruyere

2008-09-01T23:59:59.000Z

442

Surface mining environmental monitoring and reclamation handbook  

SciTech Connect (OSTI)

The Surface Mining Environmental Monitoring and Reclamation Handbook has been expressly designed to meet the statutory requirements of surface coal mining and reclamation. It sets forth a range of monitoring techniques in a manner that is most likely to be of direct, practical, and cost-effective use to the widest expanse of mining-reclamation situations. A literature review identifies and evaluates those published sources of information that are most applicable to the needs of handbook users. This is supplemented by identifying other sources of pertinent information with particular attention paid to local, state, and federal agencies that can supply data required for mining and reclamation efforts. Attention is then directed toward the means whereby regulatory requirements can be satisfied. An effort has been made to identify those areas likely to present special problems. And, finally, where appropriate, modeling techniques are described and the extent of their utility delineated. Throughout, the handbook has maintained a practical focus. It attempts to provide surface coal mine operators with the tools and techniques needed to meet legal environmental and monitoring requirements without an unnecessary and costly overexpenditure of time and money. The provision of a range of alternatives to meet various obligations, the stress on using existing resources whenever possible, and the careful differentiation of means and ends are all directed toward the best ways to meet regulatory requirements.

Sendlein, L.V.A.; Yazicigil, H.; Carlson, C.L. (eds.)

1983-01-01T23:59:59.000Z

443

Monitored Geologic Repository Test Evaluation Plan  

SciTech Connect (OSTI)

The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

M.B. Skorska

2002-01-02T23:59:59.000Z

444

Geographically distributed acoustical monitoring of migrating birds  

Science Journals Connector (OSTI)

A geographically distributed system of largely automated acoustical monitoring stations was developed to monitor the migration of small passerine birds. The targeted species wood warblers and sparrows migrate at night and produce short (about 120 ms at the longest) high?pitched (between roughly 6 and 10 kHz) calls as they fly often audible from the ground. The monitoring system consisted of ten stations located in New Jersey Maryland Pennsylvania and New York and a central data repository located at the Cornell Lab of Ornithology. Each station comprised an outdoor weatherproof microphone connected to a volunteers home computer. The computer automatically ran acoustic transient detection software each night that listened continuously to the microphone signal and extracted all transients matching certain criteria each to its own audio file. The detected transients were uploaded by the volunteer each morning via the Internet to the central repository for classification and archival. Results including spectrograms of all detected transients and bird call counts were displayed on a public web site updated daily. [Work supported by EPA.

2000-01-01T23:59:59.000Z

445

Evaluation of special nuclear material monitoring instruments  

SciTech Connect (OSTI)

A statistical method to protect against the loss of strategic special nuclear material (SSNM) is presented. A simplified step by step approach to the test procedure is described. Strategic special nuclear material (SSNM) is protected using several layers of physical and administrative controls. In a facility having both enriched and depleted uranium, extensive control is exercised to prevent a diversion of the SSNM, but assurance must also be provided that depleted material is not being removed inasmuch as its low would indicate the possible loss of SSNM through surreptitious substitution. One option for identifying loss of material is to place walkthrough monitors at the pedestrian exits leaving the perimeter of the security boundary enclosing the uranium processing area. Within this security perimeter are the SSNM areas having tight control and restricted access. The monitors for the SSNM are within buildings and are in the benign environment of a working area. Perimeter monitors on the other hand are located at the boundary rotogates and are subject to the ambient conditions varying with the seasons.

Bowman, K.O. (Oak Ridge National Lab., TN (USA). Mathematical Sciences Section); Wallace, S.A. (Oak Ridge Y-12 Plant, TN (USA))

1990-02-01T23:59:59.000Z

446

Pseudo-interactive monitoring in distributed computing  

SciTech Connect (OSTI)

Distributed computing, and in particular Grid computing, enables physicists to use thousands of CPU days worth of computing every day, by submitting thousands of compute jobs. Unfortunately, a small fraction of such jobs regularly fail; the reasons vary from disk and network problems to bugs in the user code. A subset of these failures result in jobs being stuck for long periods of time. In order to debug such failures, interactive monitoring is highly desirable; users need to browse through the job log files and check the status of the running processes. Batch systems typically don't provide such services; at best, users get job logs at job termination, and even this may not be possible if the job is stuck in an infinite loop. In this paper we present a novel approach of using regular batch system capabilities of Condor to enable users to access the logs and processes of any running job. This does not provide true interactive access, so commands like vi are not viable, but it does allow operations like ls, cat, top, ps, lsof, netstat and dumping the stack of any process owned by the user; we call this pseudo-interactive monitoring. It is worth noting that the same method can be used to monitor Grid jobs in a glidein-based environment. We further believe that the same mechanism could be applied to many other batch systems.

Sfiligoi, I.; /Fermilab; Bradley, D.; Livny, M.; /Wisconsin U., Madison

2009-05-01T23:59:59.000Z

447

Personal/Mobile Exposure Monitors D K Arvind & Michael Walters  

E-Print Network [OSTI]

Personal/Mobile Exposure Monitors D K Arvind & Michael Walters School of Informatics dka · Personal/Mobile Exposure Monitoring · Mapping the public space using numerous personal/mobile exposure per second) #12;Mobile Exposure Monitor · 16-bin (PM10 ­ PM1.0) Optical Particle Counter (Alphasense

448

The Savannah River Site's Groundwater Monitoring Program, third quarter 1991  

SciTech Connect (OSTI)

The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

Not Available

1992-02-17T23:59:59.000Z

449

Medical MoteCare: A Distributed Personal Healthcare Monitoring System  

Science Journals Connector (OSTI)

Medical MoteCare is a health monitoring system prototype suitable for monitoring the elderly and the infirm. The system utilizes a wireless sensor network of MicaZ motes equipped with pulse oximeter sensors and environmental sensors, namely temperature ... Keywords: Wireless Sensor Networks, mHealth Monitoring, SNMP, Network Management, Data Correlation, Body Area Networks

Karla Felix Navarro; Elaine Lawrence; Brian Lim

2009-02-01T23:59:59.000Z

450

Monitoring Forest Damage Methods and Development in Sweden  

E-Print Network [OSTI]

Monitoring Forest Damage Methods and Development in Sweden Sören Wulff Faculty of Forestry. Wulff) #12;Monitoring Forest Damage: Methods and Development in Sweden Abstract The aims of the work this thesis is based upon were to assess past and current methods of monitoring forest damage in Sweden

451

A Framework for Earth System Model Application Monitoring  

Science Journals Connector (OSTI)

Earth System Model (ESM) is an important tool for the research on global environmental evolution using numerical approach. Here we present a monitoring method for ESM applications based on "Earth System Model Oriented Integrated Developing Environment". ... Keywords: Earth system models, application monitoring, monitoring framework

Ran Yan; Jieqian Wu; Yibo Xie; You Meng; Depei Qian

2013-12-01T23:59:59.000Z

452

Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

Nickels, J.M.

1991-06-01T23:59:59.000Z

453

SciTech Connect: 2012 Monitoring Research Review: Ground-Based...  

Office of Scientific and Technical Information (OSTI)

2012 Monitoring Research Review: Ground-Based Nuclear Explosion Monitoring Technologies Citation Details In-Document Search Title: 2012 Monitoring Research Review: Ground-Based...

454

Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas, calendar year 1991  

SciTech Connect (OSTI)

This report describes the Offsite Radiation Safety Program conducted during 1991 by the Environmental Protection Agency`s (EPA`s) Environmental Monitoring Systems Laboratory-Las Vegas. This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ion chambers (PICs); and by biological monitoring of animals, food crops, and humans. Personnel with mobile monitoring equipment are placed in areas downwind from the test site prior to each nuclear weapons test to implement protective actions, provide immediate radiation monitoring, and obtain environmental samples rapidly after any occurrence of radioactivity release. Comparison of the measurements and sample analysis results with background levels and with appropriate standards and regulations indicated that there was no radioactivity detected offsite by the various EPA monitoring networks and no exposure above natural background to the population living in the vicinity of the NTS that could be attributed to current NTS activities. Annual and long-term trends were evaluated in the Noble Gas, Tritium, Milk Surveillance, Biomonitoring, TLD, PIC networks, and the Long-Term Hydrological Monitoring Program.

Chaloud, D.J.; Dicey, B.B.; Mullen, A.A.; Neale, A.C.; Sparks, A.R.; Fontana, C.A.; Carroll, L.D.; Phillips, W.G.; Smith, D.D.; Thome, D.J.

1992-01-01T23:59:59.000Z

455

A Landslide Monitoring and Early Warning System Using Integration of GPS, TPS and Conventional Geotechnical Monitoring Methods  

Science Journals Connector (OSTI)

An advanced comprehensive monitoring system was designed and used on the Grohovo Landslide in Croatia. Equipment selection was based on scientific requirements and consideration of possible ranges of monitored...

eljko Arbanas; Kyoji Sassa; Osamu Nagai

2014-01-01T23:59:59.000Z

456

Ecological Monitoring and Compliance Program 2006 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows were avoided during construction activities. Twenty one of the 34 projects had sites within the distribution range of the threatened desert tortoise. NNSA/NSO must comply with the terms and conditions of a permit (called a Biological Opinion) from the U.S. Fish and Wildlife Service (FWS) when conducting work in tortoise habitat. No tortoises were found in or displaced from project areas. No desert tortoises were accidentally injured or killed, nor were any captured or displaced from project sites. One desert tortoise was accidentally killed along a paved road. One site specific revegetation plan was submitted this year as required by the desert tortoise habitat revegetation plan approved in 2004. This year a total of 1.89 ha (4.69 ac) of tortoise habitat was disturbed. Revegetation of habitat at the Bren Tower burn was completed in the spring of 2006. In the summer of 2006, NSTec scientists prepared a Biological Assessment of the security activities that were being conducted at the Device Assembly Facility (DAF). NNSA requested a Biological Opinion from FWS in late 2006. Ecosystem mapping and data management in 2006 focused primarily on two tasks: (a) converting hardcopies of about 17 reports (EMAC annual reports and selected topical reports from 1996 to 2003) into electronic versions (Portable Document Format [PDF] files) to facilitate electronic document exchange, rapid retrieval, duplication, and printing, and (b) conducting an annual vegetation survey to determine wildland fire hazards on the NTS.

David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

2007-03-01T23:59:59.000Z

457

Ecological Monitoring and Compliance Program 2006 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows were avoided during construction activities. Twenty one of the 34 projects had sites within the distribution range of the threatened desert tortoise. NNSA/NSO must comply with the terms and conditions of a permit (called a Biological Opinion) from the U.S. Fish and Wildlife Service (FWS) when conducting work in tortoise habitat. No tortoises were found in or displaced from project areas. No desert tortoises were accidentally injured or killed, nor were any captured or displaced from project sites. One desert tortoise was accidentally killed along a paved road. One site specific re-vegetation plan was submitted this year as required by the desert tortoise habitat re-vegetation plan approved in 2004. This year a total of 1.89 ha (4.69 ac) of tortoise habitat was disturbed. Re-vegetation of habitat at the Bren Tower burn was completed in the spring of 2006. In the summer of 2006, NSTec scientists prepared a Biological Assessment of the security activities that were being conducted at the Device Assembly Facility (DAF). NNSA requested a Biological Opinion from FWS in late 2006. Ecosystem mapping and data management in 2006 focused primarily on two tasks: (a) converting hardcopies of about 17 reports (EMAC annual reports and selected topical reports from 1996 to 2003) into electronic versions (Portable Document Format [PDF] files) to facilitate electronic document exchange, rapid retrieval, duplication, and printing, and (b) conducting an annual vegetation survey to determine wildland fire hazards on the NTS. Copies of the PDF documents were sent to DOE's Office of Scientific and Technical Information website in Oak Ridge, Tennessee, and the DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Public Reading Facility.

David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

2007-03-01T23:59:59.000Z

458

Performance & Monitoring Tool Development Projects at NERSC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Effective System Performance (ESP) Benchmark Sustained System Performance (SSP) Benchmark Petascale Initiative Science Gateway Development Storage and I/O Technologies Design Forward Home » R & D » Performance & Monitoring Tools Performance & Monitoring Tools In order for parallel computers to attain their best performance and utilization, careful attention is needed in monitoring workloads and system resources. Integrated Performance Monitoring There are many stakeholders in the performance of application codes. In order to provide NERSC users and center staff with a consistent, portable, and scalable view into performance, NERSC uses IPM (Integrated Performance Monitoring), a lightweight application profiling layer that captures summaries of computation, communication, and IO. The performance profiles

459

Forest Monitoring for Action (FORMA) | Open Energy Information  

Open Energy Info (EERE)

Forest Monitoring for Action (FORMA) Forest Monitoring for Action (FORMA) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Forest Monitoring for Action (FORMA) Agency/Company /Organization: Center for Global Development Sector: Land, Climate Focus Area: Forestry Topics: GHG inventory, Resource assessment Resource Type: Maps Website: www.cgdev.org/section/initiatives/_active/forestmonitoringforactionfor Cost: Free Forest Monitoring for Action (FORMA) Screenshot References: FORMA[1] "Forest Monitoring for Action (FORMA) uses freely available satellite data to generate rapidly updated online maps of tropical forest clearing, providing useful information for local and national forest conservation programs, as well as international efforts to curb greenhouse gas emissions by paying to keep forests intact."

460

UN-REDD Workshop: Monitoring, Assessment and Verification | Open Energy  

Open Energy Info (EERE)

UN-REDD Workshop: Monitoring, Assessment and Verification UN-REDD Workshop: Monitoring, Assessment and Verification Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UN-REDD Workshop: Monitoring, Assessment and Verification Agency/Company /Organization: United Nations Environment Programme, Food and Agriculture Organization of the United Nations, United Nations Development Programme Sector: Land Focus Area: Forestry Topics: GHG inventory, Policies/deployment programs, Resource assessment Resource Type: Workshop Website: www.un-redd.org/UNREDDProgramme/InternationalSupport/MeasurementReport UN-REDD Workshop: Monitoring, Assessment and Verification Screenshot References: UN-REDD Workshop: Monitoring, Assessment and Verification[1] Background "The specific objectives of the workshop were to develop a roadmap with

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the programs activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

BECHTEL NEVADA ECOLOGICAL SERVICES

2006-03-01T23:59:59.000Z

462

FEMP Technology Brief: Boiler Combustion Control and Monitoring System |  

Broader source: Energy.gov (indexed) [DOE]

Boiler Combustion Control and Monitoring Boiler Combustion Control and Monitoring System FEMP Technology Brief: Boiler Combustion Control and Monitoring System October 7, 2013 - 9:12am Addthis This composite photo shows technicians observing operation at the monitoring station and making subsequent fine adjustments on combustion system controls Technical staff are making boiler adjustments with the control and monitoring system. Photo courtesy of the Department of Defense's Environmental Security Technology Certification Program. Technology Description A novel combustion control system, along with gas sensors, sets the opening of fuel and air inlets based on flue-gas concentrations. Continuous feedback from measurements of oxygen, carbon monoxide, and nitrogen oxide concentrations enable the control system

463

Renewable Energy Monitoring Evaluation Terms of Reference | Open Energy  

Open Energy Info (EERE)

Renewable Energy Monitoring Evaluation Terms of Reference Renewable Energy Monitoring Evaluation Terms of Reference Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Monitoring Evaluation Terms of Reference Agency/Company /Organization: World Bank Sector: Energy Focus Area: Renewable Energy Topics: Policies/deployment programs Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, References: Renewable Energy Monitoring Evaluation Terms of Reference[1] Resources Design of a Monitoring and Evaluation Plan Audit of Solar Home Systems Project Mid-term Review Panel for Solar Home Systems Project Socio-Economic Survey of the Photovoltaic Pilot Project References ↑ "Renewable Energy Monitoring Evaluation Terms of Reference" Retrieved from "http://en.openei.org/w/index.php?title=Renewable_Energy_Monitoring_Evaluation_Terms_of_Reference&oldid=329154"

464

Sitewide monitoring at Agra, Kansas, June 2009.  

SciTech Connect (OSTI)

In 1985, carbon tetrachloride was discovered in the groundwater at Agra, Kansas, during routine sampling of public water supply wells. Two of Agra's four public water supply wells contained low but detectable levels of carbon tetrachloride; the concentrations in wells PWS-3 and PWS-4 exceeded the maximum contaminant level. These wells were removed from service in 1986, although they remain available for uses other than drinking water. Other public wells, outside the area of contamination, supply drinking water for the city of Agra. In 1987-2005, the Kansas Department of Health and Environment (KDHE) and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) conducted investigations to delineate the contaminant plume and to identify source areas for the contamination - which results from the past use of grain fumigants containing carbon tetrachloride. Source areas were identified on the former CCC/USDA grain storage facility property and on the Producers Agricultural Marketing Association, Inc., property located to the south (Argonne 2006). The contaminant plume extends to the southeast, toward well PWS-3, from the identified source areas. Both the CCC/USDA and Pro-Ag Marketing are currently implementing KDHE-approved interim measures (IMs). To address the contamination identified on its former property, the CCC/USDA is implementing a source control IM consisting of large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). Pro-Ag Marketing plans to use groundwater extraction to address the downgradient plume. The CCC/USDA and Pro-Ag completed installation of the two interim measures in May 2009 and August 2009, respectively. The performance and assessments of the effectiveness of the IMs are being reported separately by the responsible entities. As part of the IM process, the KDHE (2008) requested the development of a joint sitewide groundwater monitoring plan to allow periodic assessment of the effectiveness of the separate IMs being implemented by the CCC/USDA and Pro-Ag, through monitoring of the level of contamination and the resulting change in both the extent and internal configuration of the downgradient plume. A Joint Work Plan for Sitewide Monitoring was developed by the CCC/USDA through its technical consultant, Argonne National Laboratory, and was reviewed, approved, and signed by Pro-Ag Marketing and subsequently submitted to the KDHE on May 12, 2009. The KDHE (2009a) provided comments on the Joint Work Plan on May 27, 2009, requesting submission of a revised version. To minimize delays, the KDHE allowed the CCC/USDA to proceed with the scheduled annual sampling proposed in the Joint Work Plan. The sampling was to be conducted according to the previously approved low-flow sampling methodology (Argonne 2009). Argonne conducted the first annual sampling event for the CCC/USDA on June 15-16, 2009. The finalized, signed version of the Joint Work Plan provided to the KDHE on November 9, 2009, is in Appendix A. Table 1.1 lists the monitoring and public water supply wells to be sampled under the Joint Work Plan, plus the wells being sampled to monitor the respective IMs. The entity responsible for each monitoring element is indicated, along with well completion dates and well registration numbers. The subject of this report is the initial sitewide groundwater sampling event that occurred on June 15-16, 2009, under the Joint Work Plan.

LaFreniere, L. M.; Environmental Science Division

2010-01-14T23:59:59.000Z

465

Monitoring and verification R&D  

SciTech Connect (OSTI)

The 2010 Nuclear Posture Review (NPR) report outlined the Administration's approach to promoting the agenda put forward by President Obama in Prague on April 5, 2009. The NPR calls for a national monitoring and verification R&D program to meet future challenges arising from the Administration's nonproliferation, arms control and disarmament agenda. Verification of a follow-on to New START could have to address warheads and possibly components along with delivery capabilities. Deeper cuts and disarmament would need to address all of these elements along with nuclear weapon testing, nuclear material and weapon production facilities, virtual capabilities from old weapon and existing energy programs and undeclared capabilities. We only know how to address some elements of these challenges today, and the requirements may be more rigorous in the context of deeper cuts as well as disarmament. Moreover, there is a critical need for multiple options to sensitive problems and to address other challenges. There will be other verification challenges in a world of deeper cuts and disarmament, some of which we are already facing. At some point, if the reductions process is progressing, uncertainties about past nuclear materials and weapons production will have to be addressed. IAEA safeguards will need to continue to evolve to meet current and future challenges, and to take advantage of new technologies and approaches. Transparency/verification of nuclear and dual-use exports will also have to be addressed, and there will be a need to make nonproliferation measures more watertight and transparent. In this context, and recognizing we will face all of these challenges even if disarmament is not achieved, this paper will explore possible agreements and arrangements; verification challenges; gaps in monitoring and verification technologies and approaches; and the R&D required to address these gaps and other monitoring and verification challenges.

Pilat, Joseph F [Los Alamos National Laboratory; Budlong - Sylvester, Kory W [Los Alamos National Laboratory; Fearey, Bryan L [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

466

Downhole Vibration Monitoring and Control System  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. The key feature of this system is its use of a magnetorheological fluid (MRF) to allow the damping coefficient to be changed extensively, rapidly and reversibly without the use of mechanical valves, but only by the application of a current. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. Much of the effort was devoted to the design and testing of the MRF damper, itself. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in a drilling laboratory. Phase II concluded on January 31, 2006, and a final report was issued. Work on Phase III of the project began during the first quarter, 2006, with the objectives of building precommercial prototypes, testing them in a drilling laboratory and the field; developing and implementing a commercialization plan. All of these have been accomplished. The Downhole Vibration Monitoring & Control System (DVMCS) prototypes have been successfully proven in testing at the TerraTek drilling facility and at the Rocky Mountain Oilfield Test Center (RMOTC.) Based on the results of these tests, we have signed a definitive development and distribution agreement with Smith, and commercial deployment is underway. This current version of the DVMCS monitors and controls axial vibrations. Due to time and budget constraints of this program, it was not possible to complete a system that would also deal with lateral and torsional (stick-slip) vibrations as originally planned; however, this effort is continuing without DOE funding.

Martin E. Cobern

2007-09-30T23:59:59.000Z

467

Monitored Geologic Repository Project Description Document  

SciTech Connect (OSTI)

The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (CRWMS M&O 2000b) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) engineering design basis in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The engineering design basis documented in the PDD is to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the engineering design basis from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the engineering design basis captured in the SDDs and the design requirements captured in U.S. Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M&O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 2-1, the MGR Architecture (Section 4.1),the Engineering Design Bases (Section 5), and the Controlled Project Assumptions (Section 6).

P. Curry

2000-06-01T23:59:59.000Z

468

Monitored Geologic Repository Project Description Document  

SciTech Connect (OSTI)

The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).

P. M. Curry

2001-01-30T23:59:59.000Z

469

Safeguards for nuclear material transparency monitoring  

SciTech Connect (OSTI)

The US and the Russian Federation are currently engaged in negotiating or implementing several nuclear arms and nuclear material control agreements. These involve placing nuclear material in specially designed containers within controlled facilities. Some of the agreements require the removal of nuclear components from stockpile weapons. These components are placed in steel containers that are then sealed and tagged. Current strategies for monitoring the agreements involve taking neutron and gamma radiation measurements of components in their containers to monitor the presence, mass, and composition of plutonium or highly enriched uranium, as well as other attributes that indicate the use of the material in a weapon. If accurate enough to be useful, these measurements will yield data containing information about the design of the weapon being monitored. In each case, the design data are considered sensitive by one or both parties to the agreement. To prevent the disclosure of this information in a bilateral or trilateral inspection scenario, so-called information barriers have evolved. These barriers combine hardware, software, and procedural safeguards to contain the sensitive data within a protected volume, presenting to the inspector only the processed results needed for verification. Interlocks and volatile memory guard against disclosure in case of failure. Implementing these safeguards requires innovation in radiation measurement instruments and data security. Demonstrating their reliability requires independent testing to uncover any flaws in design. This study discusses the general problem and gives a proposed solution for a high resolution gamma ray detection system. It uses historical examples to illustrate the evolution of other successful systems.

MacArthur, D A; Wolford, J K

1999-06-02T23:59:59.000Z

470

Monitoring, Verification, and Accounting Archived Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Archived Projects Archived Projects Ambient PM 2.5 Air Sampling & Analysis - The Upper Ohio River Valley Project ATS-Chester Engineers / Desert Research Institute 9/15/1998 Steubenville Comprehensive Air Monitoring Program CONSOL Energy Inc. / Wells Cargo / Air Quality Sciences, Inc. / Wheeling Jesuit University / Saint Vincent College / Franciscan University of Steubenville / Optimal Technologies Inc. / Harvard School of Public Health / Ohio University 3/8/2000 National Carbon Sequestration Database and Geographical Information System (NATCARB) University of Kansas Center for Research 9/27/2000 Environmental Regulatory Analysis Argonne National Laboratory 1/15/2003 Direct Measurement of Mercury Reactions in Coal Power Plant Plumes Electric Power Research Institute / Frontier

471

Health monitoring method for composite materials  

DOE Patents [OSTI]

An in-situ method for monitoring the health of a composite component utilizes a condition sensor made of electrically conductive particles dispersed in a polymeric matrix. The sensor is bonded or otherwise formed on the matrix surface of the composite material. Age-related shrinkage of the sensor matrix results in a decrease in the resistivity of the condition sensor. Correlation of measured sensor resistivity with data from aged specimens allows indirect determination of mechanical damage and remaining age of the composite component.

Watkins, Jr., Kenneth S. (Dahlonega, GA); Morris, Shelby J. (Hampton, VA)

2011-04-12T23:59:59.000Z

472

Reactor monitoring and safeguards using antineutrino detectors  

Science Journals Connector (OSTI)

Nuclear reactors have served as the antineutrino source for many fundamental physics experiments. The techniques developed by these experiments make it possible to use these very weakly interacting particles for a practical purpose. The large flux of antineutrinos that leaves a reactor carries information about two quantities of interest for safeguards: the reactor power and fissile inventory. Measurements made with antineutrino detectors could therefore orer an alternative means for verifying the power history and fissile inventory of a reactors, as part of International Atomic Energy Agency (IAEA) and other reactor safeguards regimes. Several erorts to develop this monitoring technique are underway across the globe.

N S Bowden

2008-01-01T23:59:59.000Z

473

Internal dosimetry monitoring equipment: Present and future  

SciTech Connect (OSTI)

We have attempted to characterize the current and future status of in vivo and in vitro measurement programs coupled with the associated radioanalytical methods and workplace monitoring. Developments in these areas must be carefully integrated by internal dosimetrists, radiochemists and field health physicists. Their goal should be uniform improvement rather than to focus on one specific area (e.g., dose modeling) to the neglect of other areas where the measurement capabilities are substantially less sophisticated and, therefore, the potential source of error is greatest.

Selby, J. [M.H. Chew and Associates, Inc., Richland, WA (United States); Carbaugh, E.H.; Lynch, T.P.; Strom, D.J. [Pacific Northwest Lab., Richland, WA (United States); Lardy, M.M. [International Technology Corp., Richland, WA (United States)

1993-09-01T23:59:59.000Z

474

Pattern recognition monitoring of PEM fuel cell  

DOE Patents [OSTI]

The CO-concentration in the H.sub.2 feed stream to a PEM fuel cell stack is monitored by measuring current and voltage behavior patterns from an auxiliary cell attached to the end of the stack. The auxiliary cell is connected to the same oxygen and hydrogen feed manifolds that supply the stack, and discharges through a constant load. Pattern recognition software compares the current and voltage patterns from the auxiliary cell to current and voltage signature determined from a reference cell similar to the auxiliary cell and operated under controlled conditions over a wide range of CO-concentrations in the H.sub.2 fuel stream.

Meltser, Mark Alexander (Pittsford, NY)

1999-01-01T23:59:59.000Z

475

Pattern recognition monitoring of PEM fuel cell  

DOE Patents [OSTI]

The CO-concentration in the H{sub 2} feed stream to a PEM fuel cell stack is monitored by measuring current and voltage behavior patterns from an auxiliary cell attached to the end of the stack. The auxiliary cell is connected to the same oxygen and hydrogen feed manifolds that supply the stack, and discharges through a constant load. Pattern recognition software compares the current and voltage patterns from the auxiliary cell to current and voltage signature determined from a reference cell similar to the auxiliary cell and operated under controlled conditions over a wide range of CO-concentrations in the H{sub 2} fuel stream. 4 figs.

Meltser, M.A.

1999-08-31T23:59:59.000Z

476

Low temperature monitoring system for subsurface barriers  

DOE Patents [OSTI]

A system for monitoring temperature of a subsurface low temperature zone is described. The system includes a plurality of freeze wells configured to form the low temperature zone, one or more lasers, and a fiber optic cable coupled to at least one laser. A portion of the fiber optic cable is positioned in at least one freeze well. At least one laser is configured to transmit light pulses into a first end of the fiber optic cable. An analyzer is coupled to the fiber optic cable. The analyzer is configured to receive return signals from the light pulses.

Vinegar, Harold J. (Bellaire, TX); McKinzie, II. Billy John (Houston, TX)

2009-08-18T23:59:59.000Z

477

E-Print Network 3.0 - automatic pipeline monitoring Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lake Erie Crossing Summary: ... 25 7.0 Pipeline monitoring and repair... .8%). Millennium will monitor the pipeline continuously...

478

Integrated environmental monitoring at remote ecosystems  

SciTech Connect (OSTI)

The first annual report reviews progress to date on the Idaho National Engineering Laboratory(INEL) research project, Integrated Ecosystem and Pollutant Monitoring at Remote Wilderness Study Sites.'' The two primary objectives of this study are to apply, field test, and conceptually evaluate the US Forest Service guidelines for remote ecosystem monitoring and to provide an ongoing database on selected high-elevation ecosystem attributes, including physical, chemical, and biological parameters. The basic criteria for evaluation of the guidelines are usability, cost-effectiveness, data variability, alternative approaches, ecosystem conceptual approach, and quality assurance. The goal of the project is to identify a list of pollutant measurements and ecological attributes that will provide good, quality-assured data about a particular ecosystem. The present report covers each of the major components of the Forest Service guidelines except for regulatory and management constraints and visibility, which are not part of this project. Therefore, progress to date is provided as separate sections of the report for each of the following components: atomspheric environment, soils, aquatic chemistry, aquatic biology, salmonid fish, and plants (including forest ecosystem). 24 refs., 66 figs., 28 tabs.

Bruns, D.A.; O'Rourke, T.P.; Staley, C.S.; White, G.J.; Wiersma, G.B. (EG and G Idaho, Inc., Idaho Falls, ID (USA). Center for Environmental Monitoring and Assessment); Baker, G.A.; Harmon, M.E.; Smith, B.G. (Oregon State Univ., Corvallis, OR (USA). Dept. of Forest Science); Clayton, J.L. (Forest Service, Boise, ID (USA). Intermountain Research Station); Greene, S.E. (Forest Service, Corvallis, OR (USA

1988-08-01T23:59:59.000Z

479

Autonomous Radiation Monitoring of Small Vessels  

SciTech Connect (OSTI)

Small private vessels are one avenue by which nuclear materials may be smuggled across international borders. While one can contemplate using the terrestrial approach of radiation portal monitors on the navigable waterways that lead to many ports, these systems are ill-suited to the problem. They require vehicles to pass at slow speeds between two closely-spaced radiation sensors, relying on the uniformity of vehicle sizes to space the detectors, and on proximity to link an individual vehicle to its radiation signature. In contrast to roadways where lanes segregate vehicles, and motion is well controlled by inspection booths; channels, inlets, and rivers present chaotic traffic patterns populated by vessels of all sizes. We have developed a unique solution to this problem based on our portal-less portal monitor instrument that is designed to handle free-flowing traffic on roadways with up to five-traffic lanes. The instrument uses a combination of visible-light and gamma-ray imaging to acquire and link radiation images to individual vehicles. It was recently tested in a maritime setting. In this paper we present the instrument, how it functions, and the results of the recent tests.

Fabris, Lorenzo [ORNL; Hornback, Donald Eric [ORNL

2010-01-01T23:59:59.000Z

480

Beam Position Monitor System for PEP II  

SciTech Connect (OSTI)

We describe the beam position monitor system built for PEP-II, the B-factory at SLAC. The system reports beam position for bunches of between 5 x 10{sup 8} and 8 x 10{sup 10} electron charges, either singly or as continuous streams of bunches every 4.2 ns. Resolution at full charge is to be better than 10 microns in a single turn. Higher resolution is available via on-board multi-turn averaging. The position signal is processed in a 20 MHz bandwidth around 952 MHz. This bandwidth, rather broader than that typical of RF position monitors, allows good resolution for low charge single bunches. Additional novel features include stringent control of return losses in order to minimize cross-talk between nearby bunches which may contain very different charges. The digitizing electronics is multiplexed between the two PEP-II storage rings. Design, construction, and installation experience, as well as first results with beam are presented.

Smith, Stephen R.; Aiello, G.Roberto; Hendrickson, Linda J.; Johnson, Ronald G.; Mills, Mark R.; Olsen, Jeff J.; /SLAC

2011-09-12T23:59:59.000Z

Note: This page contains sample records for the topic "micro-earthquake teleseismic-seismic monitoring" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Clean Slate 1 revegetation and monitoring plan  

SciTech Connect (OSTI)

This document constitutes a reclamation plan for the short-term and long-term stabilization of land disturbed by activities associated with the cleanup of radionuclide contaminated surface soil at the Clean Slate 1 site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. The results of reclamation trials at Area 11, Area 19 and more recently the reclamation demonstration plots at the Double Tracks cleanup site, have been summarized and incorporated into this reclamation and monitoring plan. The plan also contains procedures for monitoring both the effectiveness and success of short-term and long-term soil stabilization. The Clean Slate 1 site is located on the Tonopah Test Range. The surface soils were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation.

Anderson, D.C.; Hall, D.B.

1997-07-01T23:59:59.000Z

482

MONITORED GEOLOGIC REPOSITORY SYSTEMS REQUIREMENTS DOCUMENT  

SciTech Connect (OSTI)

This document establishes the Monitored Geologic Repository system requirements for the U.S. Department of Energy's (DOE's) Civilian Radioactive Waste Management System (CRWMS). These requirements are based on the ''Civilian Radioactive Waste Management System Requirements Document'' (CRD) (DOE 2004a). The ''Monitored Geologic Repository Systems Requirements Document'' (MGR-RD) is developed in accordance with LP-3.3 SQ-OCRWM, ''Preparation, Review, and Approval of Office of Repository Development Requirements Document''. As illustrated in Figure 1, the MGR-RD forms part of the DOE Office of Civilian Radioactive Waste Management Technical Requirements Baseline. Revision 0 of this document identifies requirements for the current phase of repository design that is focused on developing a preliminary design for the repository and will be included in the license application submitted to the U.S. Nuclear Regulatory Commission for a repository at Yucca Mountain in support of receiving a construction authorization and subsequent operating license. As additional information becomes available, more detailed requirements will be identified in subsequent revisions to this document.

V. Trebules

2006-06-02T23:59:59.000Z

483

National and international nuclear material monitoring  

SciTech Connect (OSTI)

The status of nuclear materials in both the U.S. and Former Soviet Union is changing based upon the execution of agreements relative to weapons materials production and weapon dismantlement. The result of these activities is that a considerably different emphasis is being placed on how nuclear materials are viewed and utilized. Even though much effort is being expended on the final disposition of these materials, the interim need for storage and security of the material is increasing. Both safety and security requirements exist to govern activities when these materials are placed in storage. These requirements are intended to provide confidence that the material is not being misused and that the storage operations are conducted safely. Both of these goals can be significantly enhanced if technological monitoring of the material is performed. This paper will briefly discuss the traditional manual methods of U.S. and international material monitoring and then present approaches and technology that are available to achieve the same goals under the evolving environment.

Waddoups, I.G.

1996-07-01T23:59:59.000Z

484

Reservoir monitoring: 1990 summary of vital signs and use impairment monitoring on Tennessee Valley Reservoirs  

SciTech Connect (OSTI)

The Tennessee Valley Authority (TVA) initiated a Reservoir Monitoring Program on 12 TVA reservoirs (the nine main stream Tennessee river reservoirs -- Kentucky through Fort Loudoun and three major tributary storage reservoirs -- Cherokee, Douglas, and Norris) in autumn 1989. The objective of the Reservoir Monitoring Program is to provide basic information on the ``health`` or integrity of the aquatic ecosystem in each TVA reservoir (``Vital Signs``) and to provide screening level information for describing how well each reservoir meets the swimmable and fishable goals of the Clean Water Act (Use Impairments). This is the first time in the history of the agency that a commitment to a long-term, systematic sampling of major TVA reservoirs has been made. The basis of the Vital Signs Monitoring is examination of appropriate physical, chemical, and biological indicators in three areas of each reservoir. These three areas are the forebay immediately upstream of the dam; the transition zone (the mid-reservoir region where the water changes from free flowing to more quiescent, impounded water); and the inflow or headwater region of the reservoir. The Use Impairments monitoring provides screening level information on the suitability of selected areas within TVA reservoirs for water contact activities (swimmable) and suitability of fish from TVA reservoirs for human consumption (fishable).

Dycus, D.L.; Meinert, D.L.

1991-08-01T23:59:59.000Z

485

Reservoir monitoring: 1990 summary of vital signs and use impairment monitoring on Tennessee Valley Reservoirs  

SciTech Connect (OSTI)

The Tennessee Valley Authority (TVA) initiated a Reservoir Monitoring Program on 12 TVA reservoirs (the nine main stream Tennessee river reservoirs -- Kentucky through Fort Loudoun and three major tributary storage reservoirs -- Cherokee, Douglas, and Norris) in autumn 1989. The objective of the Reservoir Monitoring Program is to provide basic information on the health'' or integrity of the aquatic ecosystem in each TVA reservoir ( Vital Signs'') and to provide screening level information for describing how well each reservoir meets the swimmable and fishable goals of the Clean Water Act (Use Impairments). This is the first time in the history of the agency that a commitment to a long-term, systematic sampling of major TVA reservoirs has been made. The basis of the Vital Signs Monitoring is examination of appropriate physical, chemical, and biological indicators in three areas of each reservoir. These three areas are the forebay immediately upstream of the dam; the transition zone (the mid-reservoir region where the water changes from free flowing to more quiescent, impounded water); and the inflow or headwater region of the reservoir. The Use Impairments monitoring provides screening level information on the suitability of selected areas within TVA reservoirs for water contact activities (swimmable) and suitability of fish from TVA reservoirs for human consumption (fishable).

Dycus, D.L.; Meinert, D.L.

1991-08-01T23:59:59.000Z

486

Wireless Sensor Network forWireless Sensor Network for Aircraft Health MonitoringAircraft Health Monitoring  

E-Print Network [OSTI]

Monitoring Technologies presented here are patent pending. For more details, please send emails to haowei.bai@honeywell.com Haowei Bai Honeywell Labs 3660 Technology Drive Minneapolis, MN 55418 Phone: 612-951-7107 Email: haowei.bai@honeywell Technologies presented here are patent pending. For more details, please send emails to haowei.bai@honeywell

Atiquzzaman, Mohammed

487

Ultrahigh Sensitivity Heavy Noble Gas Detectors for Long-Term Monitoring and for Monitoring Air  

SciTech Connect (OSTI)

The primary objective of this research project is to develop heavy noble gas (krypton, xenon, and radon) detectors for (1) long-term monitoring of transuranic waste, spent fuel, and other uranium and thorium bearing wastes and (2) alpha particle air monitors that discriminate between radon emissions and other alpha emitters. A University of Cincinnati/Argonne National Laboratory (UC/ANL) Team was assembled to complete this detector development project. Effective 1/4/99, the UC PI (John Valentine) became an Associate Professor in the Nuclear and Radiological Engineering Program of the George W. Woodruff School of Mechanical Engineering at the Georgia Institute of Technology. Consequently, this project was transferred to Georgia Tech (GT) with the PI. UC funding extended to 1/31/99 and GT funding became active 4/26/99. Due to this transfer, we will refer to the research team as the GT/UC/ANL Team for this Annual Report. Subsequently, we will use GT/ANL Team. DOE needs that are ad dressed by this project include improved long-term monitoring capability and improved air monitoring capability during remedial activities. Successful development and implementation of the proposed detection systems could significantly improve current capabilities with relatively simple and inexpensive equipment.

Valentine,John D.; Gross, Kenny

1999-06-01T23:59:59.000Z

488

Marion Meteorological Tower Wind Monitoring This document provides information not repeated in the monthly wind monitoring  

E-Print Network [OSTI]

. The logger samples wind speed and direction once every two seconds. These are then combined into 10-minute): wind speed, wind speed standard deviation, wind direction, temperature, and solar insolation. F1 > TF1 applied for high and low wind speeds. A wind direction standard Marion Met Tower Wind Monitoring #12

Massachusetts at Amherst, University of

489

The Community Environmental Monitoring Program in the 21st Century: The Evolution of a Monitoring Network  

SciTech Connect (OSTI)

This paper focuses on the evolution of the various operational aspects of the Community Environmental Monitoring Program (CEMP) network following the transfer of program administration from the U.S. Environmental Protection Agency (EPA) to the Desert Research Institute (DRI) of the Nevada System of Higher Education in 1999-2000. The CEMP consists of a network of 29 fixed radiation and weather monitoring stations located in Nevada, Utah, and California. Its mission is to involve stakeholders directly in monitoring for airborne radiological releases to the off site environment as a result of past or ongoing activities on the Nevada Test Site (NTS) and to make data as transparent and accessible to the general public as feasible. At its inception in 1981, the CEMP was a cooperative project of the U.S. Department of Energy (DOE), DRI, and EPA. In 1999-2000, technical administration of the CEMP transitioned from EPA to DRI. Concurrent with and subsequent to this transition, station and program operations underwent significant enhancements that furthered the mission of the program. These enhancements included the addition of a full suite of meteorological instrumentation, state-of-the-art electronic data collectors, on-site displays, and communications hardware. A public website was developed. Finally, the DRI developed a mobile monitoring station that can be operated entirely on solar power in conjunction with a deep-cell battery, and includes all meteorological sensors and a pressurized ion chamber for detecting background gamma radiation. Final station configurations have resulted in the creation of a platform that is well suited for use as an in-field multi-environment test-bed for prototype environmental sensors and in interfacing with other scientific and educational programs. Recent and near-future collaborators have included federal, state, and local agencies in both the government and private sectors. The CEMP also serves as a model for other programs wishing to involve stakeholders with a meaningful role in the process of monitoring and data collection.

Hartwell, W.T.; Tappen, J.; Karr, L.

2007-01-19T23:59:59.000Z

490

Projects To Develop Novel Monitoring Networks for Advanced Power Systems  

Broader source: Energy.gov (indexed) [DOE]

To Develop Novel Monitoring Networks for Advanced Power To Develop Novel Monitoring Networks for Advanced Power Systems Selected Projects To Develop Novel Monitoring Networks for Advanced Power Systems Selected September 1, 2010 - 1:00pm Addthis Washington, DC - Five projects that will develop technologically sophisticated monitoring networks for advanced fossil energy power systems have been selected for continued research by the U.S. Department of Energy (DOE). The projects will support efforts by the Office of Fossil Energy's (FE) Advanced Research--Coal Utilization Science (CUS) Program to study novel approaches in model development and validation; monitoring refractory health; and wireless, self-powered sensors for advanced, next-generation power systems. They will monitor the status of equipment, materials

491

Remote Gas Well Monitoring Technology Applied to Marcellus Shale Site |  

Broader source: Energy.gov (indexed) [DOE]

Remote Gas Well Monitoring Technology Applied to Marcellus Shale Remote Gas Well Monitoring Technology Applied to Marcellus Shale Site Remote Gas Well Monitoring Technology Applied to Marcellus Shale Site February 10, 2012 - 12:00pm Addthis Washington, DC - A technology to remotely monitor conditions at energy-rich Marcellus Shale gas wells to help insure compliance with environmental requirements has been developed through a research partnership funded by the U.S. Department of Energy (DOE). NETL-RUA researcher Dr. Michael McCawley hasdeveloped a technology to remotely monitor theenvironment around energy-rich Marcellus Shale gas wells. Photo courtesy of West Virginia University.The technology - which involves three wireless monitoring modules to measure volatile organic compounds, dust, light and sound - is currently being tested at a Marcellus

492

Facility effluent monitoring plan for the Plutonium Uranium Extraction Facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan will ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, at a minimum, every 3 years.

Greager, E.M.

1997-12-11T23:59:59.000Z

493

Hanford Site groundwater monitoring: Setting, sources and methods  

SciTech Connect (OSTI)

Groundwater monitoring is conducted on the Hanford Site to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA); Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); U.S. Department of Energy (DOE) orders; and the Washington Administrative Code. Results of monitoring are published annually (e.g., PNNL-11989). To reduce the redundancy of these annual reports, background information that does not change significantly from year to year has been extracted from the annual report and published in this companion volume. This report includes a description of groundwater monitoring requirements, site hydrogeology, and waste sites that have affected groundwater quality or that require groundwater monitoring. Monitoring networks and methods for sampling, analysis, and interpretation are summarized. Vadose zone monitoring methods and statistical methods also are described. Whenever necessary, updates to information contained in this document will be published in future groundwater annual reports.

M.J. Hartman

2000-04-11T23:59:59.000Z

494

Ambient Radon-222 Monitoring in Amargosa Valley, Nevada  

SciTech Connect (OSTI)

As part of a program to characterize and baseline selected environmental parameters in the region around the proposed repository at Yucca Mountain, Nevada, ambient radon-222 monitoring was conducted in the rural community of Amargosa Valley, the community closest to the proposed repository site. Passive integrating radon monitors and a continuous radon monitoring instrument were deployed adjacent to the Community Environmental Monitoring Program (CEMP) (http://www.cemp.dri.edu/index.html) station located in the Amargosa Valley Community Center near the library. The CEMP station provided real-time ambient gamma exposure and meteorological data used to correct the integrated radon measurements as well as verify meteorological data collected by the continuous radon monitoring instrument. Additionally, different types of environmental enclosures that housed the monitors and instrument were used to determine if particular designs influenced the ambient radon measurements.

L.H. Karr; J.J. Tappen; D. Shafer; K.J. Gray

2008-06-05T23:59:59.000Z

495

Hanford Site Groundwater Monitoring for Fiscal Year 2006  

SciTech Connect (OSTI)

This report presents the results of groundwater monitoring for FY 2006 on DOE's Hanford Site. Results of groundwater remediation, vadose zone monitoring, and characterization are summarized. DOE monitors groundwater at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act (AEA), the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and Washington Administrative Code (WAC).

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2007-03-01T23:59:59.000Z

496

Burrowing Owl Monitoring Report for Calendar Year 2012  

SciTech Connect (OSTI)

The monitoring during 2012 focused on documenting the status of known burrows. Newly identified burrows were documented while examining historical locations, during ecological resource reviews, or discovered during other monitoring efforts. The timing of the monitoring effort allowed staff to perform the surveys without disrupting any breeding or hatching, while also allowing for easy discernment of adults from juveniles, which helped in determining burrow-use type.

Wilde, Justin W.; Lindsey, Cole T.; Nugent, John J.

2013-03-14T23:59:59.000Z

497

Application of microfluidics in waterborne pathogen monitoring: A review  

Science Journals Connector (OSTI)

Abstract A review of the recent advances in microfluidics based systems for the monitoring of waterborne pathogens is provided in this article. Emphasis has been made on existing, commercial and state-of-the-art systems and research activities in laboratories worldwide. The review separates sample processing systems and monitoring systems, highlighting the slow progress made in automated sample processing for monitoring of pathogens in waterworks and in the field. Future potential directions of research are also highlighted in the conclusions.

Helen Bridle; Brian Miller; Marc P.Y. Desmulliez

2014-01-01T23:59:59.000Z

498

Hot particle laundry monitoring at a nuclear power facility  

E-Print Network [OSTI]

by adjusting a knob on the control console. The control console contains the control unit, the upper detector control system and the nuclear electronics. The ACM-120 uses a microprocessor to analyze the data and monitor for various system malfunctions..., monitoring method, detector type, alarm levels and the storage and disposal limits. In the second part, a detailed evaluation was conducted on three automated laundry monitors; National Nuclear LCM-15A, I. R. T. ACM-120, Interstate Nuclear Services ALM...

Farver, Douglas Floyd

2012-06-07T23:59:59.000Z

499

Monitoring Buildings with Energy Management and Control Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Monitoring Buildings with Energy Management and Control Systems Monitoring and evaluation are important parts of all energy-efficiency programs. With the increasing regulatory requirements for verification of demand-side management program savings and continued development of more innovative financing mechanisms, the ability to substantiate claims of energy savings using measured data takes on added importance. Although expensive, the accurate monitoring of energy consumption and building operations is a necessary part of conservation savings analysis. Energy management and control systems (EMCSs), intended for building operations and control functions, already contain most of the same equipment usually installed for energy monitoring and can often be used for

500

Facility effluent monitoring plan for the tank farm facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

Crummel, G.M.

1998-05-18T23:59:59.000Z