Powered by Deep Web Technologies
Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Utility-Scale Smart Meter Deployments, Plans & Proposals | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear Guide Remote Access toDeploymentRateEnergy

2

Smart Meter Deployment Optimization for Efficient Electrical Appliance State Monitoring  

E-Print Network [OSTI]

Smart Meter Deployment Optimization for Efficient Electrical Appliance State Monitoring Xiaohong approaches generally require large-scale smart sensor/meter networks, and thus suffer from the high to optimize the smart meter deployments to track the on/off states of the massive electrical appliances

Wang, Yongcai

3

Meter Expansion Plan Existing Multi-Space Meter  

E-Print Network [OSTI]

Meter Expansion Plan 11 35 9 7 10 20 12 11 12 46 23 15 15 60 23 Existing Multi-Space Meter Split Regulations 136 New Multi-Space Meter Visitor Only New Multi-Space Meter Split Regulations KEY 97 Updated 7/8/13 11 5 #12;HAVE.HAVE. UNION DR. 1 2 3 4 5 New Multi-space Meter After: 5 Meter Spaces Regulations

Duchowski, Andrew T.

4

Metering Plan: Monitoring Energy and Potable Water Use in PNNL EMS4 Buildings  

SciTech Connect (OSTI)

This Plan presents progress toward the metering goals shared by all national laboratories and discusses PNNL's contemporary approach to the installation of new meters. In addition, the Plan discusses the data analysis techniques with which PNNL is working to mature using endless data streams made available as a result of increased meter deployment.

Pope, Jason E.

2012-07-25T23:59:59.000Z

5

Deployment of Behind-The-Meter Energy Storage for Demand Charge...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deployment of Behind-The- Meter Energy Storage for Demand Charge Reduction J. Neubauer and M. Simpson Technical Report NRELTP-5400-63162 January 2015 NREL is a national laboratory...

6

Deployment of High Resolution Real-Time Distribution Level Metering on Maui: Preprint  

SciTech Connect (OSTI)

In order to support the ongoing Maui Smart Grid demonstration project advanced metering has been deployed at the distribution transformer level in Maui Electric Company's Kihei Circuit on the Island of Maui. This equipment has been custom designed to provide accurately time-stamped Phasor and Power Quality data in real time. Additionally, irradiance sensors have been deployed at a few selected locations in proximity to photovoltaic (PV) installations. The received data is being used for validation of existing system models and for impact studies of future system hardware. Descriptions of the hardware and its installation, and some preliminary metering results are presented. Real-time circuit visualization applications for the data are also under development.

Bank, J.

2013-01-01T23:59:59.000Z

7

Meters  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping theEnergy StorageAdvancedMetamaterials Researchsc 620 Meters ~

8

Deployment of Behind-The-Meter Energy Storage for Demand Charge Reduction  

SciTech Connect (OSTI)

This study investigates how economically motivated customers will use energy storage for demand charge reduction, as well as how this changes in the presence of on-site photovoltaic power generation, to investigate the possible effects of incentivizing increased quantities of behind-the-meter storage. It finds that small, short-duration batteries are most cost effective regardless of solar power levels, serving to reduce short load spikes on the order of 2.5% of peak demand. While profitable to the customer, such action is unlikely to adequately benefit the utility as may be desired, thus highlighting the need for modified utility rate structures or properly structured incentives.

Neubauer, J.; Simpson, M.

2015-01-01T23:59:59.000Z

9

Deploying  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: CrudeOffice ofINLNuclear262About Us >Deploying

10

Advanced Metering Plan for Monitoring Energy and Potable Water Use in PNNL EMS4 Buildings  

SciTech Connect (OSTI)

This updated Advanced Metering Plan for monitoring whole building energy use in Pacific Northwest National Laboratory (PNNL) EMS4 buildings on the PNNL campus has been prepared in accordance with the requirements of the Energy Policy Act of 2005 (EPAct 2005), Section 103, U.S. Department of Energy (DOE) Order 430.2B, and Metering Best Practices, A Guide to Achieving Utility Resource Efficiency, Federal Energy Management Program, October 2007 (Sullivan et al. 2007). The initial PNNL plan was developed in July 2007 (Olson 2007), updated in September 2008 (Olson et al. 2008), updated in September 2009 (Olson et al. 2009), and updated again in August 2010 (Olson et al. 2010).

Pope, Jason E.; Olson, Norman J.; Berman, Marc J.; Schielke, Dale R.

2011-08-17T23:59:59.000Z

11

Title of Project: Systemwide Information for Transportation Assessment: Economic Impacts and ITS Deployment Planning  

E-Print Network [OSTI]

in the Northeastern Illinois area are to improve safety, improve service level (efficiency), reduce energy Deployment Planning Sponsors: Illinois Department of Transportation (IDOT) and Federal Highway Administration plans with a complete economic impact. Using this tool, the six-county Northeastern Illinois region

Illinois at Chicago, University of

12

OTEC-1 Power System Test Program: test plan for first deployment  

SciTech Connect (OSTI)

This report describes in detail all tests planned for the first eight-month deployment of OTEC-1, a test facility constructed by the US Department of Energy in order to test heat exchangers for closed-cycle power plants using ocean thermal energy. Tests to be performed during the first-deployment period are aimed primarily at determining (1) the effectiveness of countermeasures in preventing biofouling of the heat exchanters, (2) the extent of environmental impacts associated with operation of an OTEC facility, and (3) the performance of a 1-MWe, titanium shell-and-tube evaporator and condenser pair. The condenser to be tested has plain tubes, and the evaporator employs the Linde High Flux surface on the working-fluid (ammonia) side to enhance the heat-transfer rate. This plan provides a statement of the objectives and priorities of the test program, describes the test equipment, gives a detailed account of all tests to be performed and the test schedule, and discusses provisions for management of the test program.

None

1980-03-01T23:59:59.000Z

13

Designing and testing the neutron source deployment system and calibration plan for a dark matter detector  

E-Print Network [OSTI]

In this thesis, we designed and tested a calibration and deployment system for the MiniCLEAN dark matter detector. The deployment system uses a computer controlled winch to lower a canister containing a neutron source into ...

Westerdale, Shawn (Shawn S.)

2011-01-01T23:59:59.000Z

14

Test plan for the 34 meter vertical axis wind turbine test bed located at Bushland, Texas  

SciTech Connect (OSTI)

A plan is presented for the testing and evaluation of a new 500 kw vertical axis wind turbine test bed. The plan starts with the initial measurements made during construction, proceeds through evaluation of the design, the development of control methods, and finally to the test bed phase where new concepts are evaluated and in-depth studies are performed.

Stephenson, W.A.

1986-12-01T23:59:59.000Z

15

Energy Theft in the Advanced Metering Infrastructure  

E-Print Network [OSTI]

of the smart grid is an advanced metering infrastructure (AMI). AMI replaces the analog meters, but that current AMI devices introduce a myriad of new vectors for achieving it. Key words: AMI, Smart meter currently deployed smart-meters, and attempt to identify root causes of existing vulnerabilities. Theft

McDaniel, Patrick Drew

16

Net Metering  

Broader source: Energy.gov [DOE]

In April 2008, Kentucky enacted legislation that expanded its net metering law by requiring utilities to offer net metering to customers that generate electricity with photovoltaic (PV), wind,...

17

Net Metering  

Broader source: Energy.gov [DOE]

NOTE: Kauai Island Electric Cooperative's (KIUC) net metering program has reached its capacity and has implemented a Net Energy Metering Pilot Program.

18

Net Metering  

Broader source: Energy.gov [DOE]

The Indiana Utility Regulatory Commission (IURC) adopted rules for net metering in September 2004, requiring the state's investor-owned utilities (IOUs) to offer net metering to all electric...

19

Net Metering  

Broader source: Energy.gov [DOE]

In Massachusetts, the state's investor-owned utilities must offer net metering. Municipal utilities are not obligated to offer net metering, but they may do so voluntarily. (There are no electric...

20

Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities in Support of Marine and Hydrokinetic Energy Deployment  

SciTech Connect (OSTI)

This fiscal year 2011 progress report summarizes activities carried out under DOE Water Power Task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the marine and hydrokinetic (MHK) energy industry, including regulatory and resource management agencies, tribes, nongovernmental organizations, and industry. Objectives for Task 2.1.7 are the following: • to work with stakeholders to streamline the MHK regulatory permitting process • to work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development • to communicate research findings and directions to the MHK industry and stakeholders • to engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which is described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning. As MHK industry partners work with the regulatory community and stakeholders to plan, site, permit, and license MHK technologies, they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under Task 2.1.7 is to understand and work to address these varied interests, reduce conflict, identify efficiencies, and ultimately reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

Geerlofs, Simon H.; Copping, Andrea E.; Van Cleve, Frances B.; Blake, Kara M.; Hanna, Luke A.

2011-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Lesson Plan: Power Metering  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10 DOEWashington,LM-04-XXXXLocatedMakes A Home

22

NASA's Metering Plan  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUAL

23

Metering Approaches  

Broader source: Energy.gov [DOE]

Metering approaches vary depending on facility design and intended purpose (e.g., administrative offices, laboratory, warehouse, etc.). No one approach fits all applications. In fact, different...

24

Net Metering  

Broader source: Energy.gov [DOE]

Net metering is available to customers who generate electricity using solar, wind, hydroelectric, geothermal, biomass, biogas, combined heat and power (CHP) or fuel cell technologies. The ACC has...

25

Net Metering  

Broader source: Energy.gov [DOE]

Missouri enacted legislation in June 2007 (S.B. 54)* requiring all electric utilities -- investor-owned utilities, municipal utilities and electric cooperatives -- to offer net metering to...

26

Net Metering  

Broader source: Energy.gov [DOE]

New Jersey's net-metering rules apply to all residential, commercial and industrial customers of the state's investor-owned utilities and energy suppliers (and certain competitive municipal...

27

Net Metering  

Broader source: Energy.gov [DOE]

Net metering has been available in Oklahoma since 1988 under Oklahoma Corporation Commission (OCC) Order 326195. The OCC's rules require investor-owned utilities and electric cooperatives under...

28

Net Metering  

Broader source: Energy.gov [DOE]

Wyoming enacted legislation in February 2001 that established statewide net metering. The law applies to investor-owned utilities, electric cooperatives and irrigation districts. Eligible...

29

Net Metering  

Broader source: Energy.gov [DOE]

In October 2009, the Regulatory Commission of Alaska (RCA) approved net metering regulations. These rules were finalized and approved by the lieutenant governor in January 2010 and became...

30

Long Island Smart Metering Pilot Project  

SciTech Connect (OSTI)

The Long Island Power Authority (LIPA) Smart Meter Pilots provided invaluable information and experience for future deployments of Advanced Metering Infrastructure (AMI), including the deployment planned as part of LIPAâ??s Smart Grid Demonstration Project (DE-OE0000220). LIPA will incorporate lessons learned from this pilot in future deployments, including lessons relating to equipment performance specifications and testing, as well as equipment deployment and tracking issues. LIPA ultimately deployed three AMI technologies instead of the two that were originally contemplated. This enabled LIPA to evaluate multiple systems in field conditions with a relatively small number of meter installations. LIPA experienced a number of equipment and software issues that it did not anticipate, including issues relating to equipment integration, ability to upgrade firmware and software â??over the airâ? (as opposed to physically interacting with every meter), and logistical challenges associated with tracking inventory and upgrade status of deployed meters. In addition to evaluating the technology, LIPA also piloted new Time-of-Use (TOU) rates to assess customer acceptance of time-differentiated pricing and to evaluate whether customers would respond by adjusting their activities from peak to non-peak periods. LIPA developed a marketing program to educate customers who received AMI in the pilot areas and to seek voluntary participation in TOU pricing. LIPA also guaranteed participating customers that, for their initial year on the rates, their electricity costs under the TOU rate would not exceed the amount they would have paid under the flat rates they would otherwise enjoy. 62 residential customers chose to participate in the TOU rates, and every one of them saved money during the first year. 61 of them also elected to stay on the TOU rate â?? without the cost guarantee â?? at the end of that year. The customer who chose not to continue on the rate was also the one who achieved the greatest savings. However, after the first year, the customer in question installed equipment that would have made TOU rates a more costly option than the residential flat rate. During the second year, all but one customer saved money. That customer increased usage during peak hours, and as a result saw an increase in annual costs (as compared to the flat rate) of $24.17. The results were less clear for commercial customers, which LIPA attributes to rate design issues that it will take into account for future deployments. LIPA views this pilot as a complete success. Not only is LIPA better prepared for a larger deployment of AMI, but it is confident that residential customers will accept AMI and TOU rates and shift their energy consumption from peak to non-peak periods in response to pricing. On a larger scale, this will benefit LIPA and all of its customers by potentially lowering peak demand when energy costs are highest.

None

2012-03-30T23:59:59.000Z

31

Monitoring Massive Appliances by a Minimal Number of Smart Meters  

E-Print Network [OSTI]

56 Monitoring Massive Appliances by a Minimal Number of Smart Meters YONGCAI WANG, XIAOHONG HAO. This article presents a framework for deploying a minimal number of smart meters to accurately track the ON of required smart meters is studied by an entropy-based approach, which qualifies the impact of meter

Wang, Yongcai

32

Net Metering  

Broader source: Energy.gov [DOE]

'''''NOTE: Legislation enacted in 2011 and 2012 (S.B. 1652, H.B. 3036, and S.B. 3811) has changed several aspects of net metering in Illinois. For customers in competitive classes as of July 1,...

33

Net Metering  

Broader source: Energy.gov [DOE]

The North Carolina Utilities Commission (NCUC) requires the state’s three investor-owned utilities -- Duke Energy, Progress Energy and Dominion North Carolina Power -- to make net metering...

34

Net Metering  

Broader source: Energy.gov [DOE]

New Hampshire requires all utilities selling electricity in the state to offer net metering to customers who own or operate systems up to one megawatt (1 MW) in capacity that generate electricity...

35

Net Metering  

Broader source: Energy.gov [DOE]

Montana's net-metering law, enacted in July 1999, applies to all customers of investor-owned utilities. Systems up to 50 kilowatts (kW) in capacity that generate electricity using solar, wind or...

36

Net Metering  

Broader source: Energy.gov [DOE]

Net metering in West Virginia is available to all retail electricity customers. System capacity limits vary depending on the customer type and electric utility type, according to the following...

37

Net Metering  

Broader source: Energy.gov [DOE]

California's net-metering law originally took effect in 1996 and applies to all utilities with one exception*. The law has been amended numerous times since its enactment, most recently by AB 327...

38

Net Metering  

Broader source: Energy.gov [DOE]

Washington's net-metering law applies to systems up to 100 kilowatts (kW) in capacity that generate electricity using solar, wind, hydro, biogas from animal waste, or combined heat and power...

39

Net Metering  

Broader source: Energy.gov [DOE]

In Delaware, net metering is available to any customer that generates electricity using solar, wind or hydro resources, anaerobic digesters, or fuel cells capable of being powered by renewable...

40

Net Metering  

Broader source: Energy.gov [DOE]

Note: The program web site listed above links to the Maryland Public Service Commission's Net Metering Working Group page, which contains a variety of information resources related to the ongoing...

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Net Metering  

Broader source: Energy.gov [DOE]

In April 2001, Arkansas enacted legislation (HB 2325) directing the Arkansas Public Service Commission (PSC) to establish net-metering rules for certain renewable-energy systems.* The PSC approved...

42

Net Metering  

Broader source: Energy.gov [DOE]

In the District of Columbia (DC), net metering is currently available to residential and commercial customer-generators with systems powered by renewable-energy sources, combined heat and power ...

43

Net Metering  

Broader source: Energy.gov [DOE]

The Public Service Commission of Wisconsin (PSC) issued an order on January 26, 1982 requiring all regulated utilities to file tariffs allowing net metering to customers that generate electricity...

44

Net Metering  

Broader source: Energy.gov [DOE]

Iowa's statutes do not explicitly authorize the Iowa Utilities Board (IUB) to mandate net metering, but this authority is implicit through the board's enforcement of PURPA and Iowa Code § 476.41 '...

45

Net Metering  

Broader source: Energy.gov [DOE]

North Dakota's net-metering policy, adopted in 1991 by the state Public Service Commission (PSC), applies to renewable-energy systems and combined heat and power (CHP) systems up to 100 kilowatts ...

46

Net Metering  

Broader source: Energy.gov [DOE]

Oregon has established separate net-metering programs for the state's primary investor-owned utilities (PGE and PacifiCorp), and for its municipal utilities and electric cooperatives.

47

Net Metering  

Broader source: Energy.gov [DOE]

Utah law requires their only investor-owned utility, Rocky Mountain Power (RMP), and most electric cooperatives* to offer net metering to customers who generate electricity using solar energy, wind...

48

Net Metering  

Broader source: Energy.gov [DOE]

Net metering is available to all "qualifying facilities" (QFs), as defined by the federal Public Utility Regulatory Policies Act of 1978 (PURPA)*, which pertains to systems up to 80 megawatts (MW)...

49

Net Metering  

Broader source: Energy.gov [DOE]

[http://nebraskalegislature.gov/FloorDocs/101/PDF/Final/LB436.pdf LB 436], signed in May 2009, established statewide net metering rules for all electric utilities in Nebraska. The rules apply to...

50

Net Metering  

Broader source: Energy.gov [DOE]

'''''Note: H.F. 729, enacted in May 2013, includes many changes to Minnesota's net metering law. These changes are described above, but most will not take effect until rules are implemented at the...

51

Net Metering  

Broader source: Energy.gov [DOE]

'''''Note: In March 2011, Virginia enacted HB 1983, which increased the residential net-metering limit to 20 kW. However, residential facilities with a capacity of greater than 10 kW must pay a...

52

Net Metering  

Broader source: Energy.gov [DOE]

Connecticut's two investor-owned utilities -- Connecticut Light and Power Company (CL&P) and United Illuminating Company (UI) -- are required to provide net metering to customers that generate...

53

Net Metering  

Broader source: Energy.gov [DOE]

'''''The MPSC is reviewing state interconnection and net metering policies in [http://efile.mpsc.state.mi.us/efile/viewcase.php?casenum=15919&submit.x=... Case U-15919].'''''...

54

Net Metering  

Broader source: Energy.gov [DOE]

In March 2008, the Florida Public Service Commission (PSC) adopted rules for net metering and interconnection for renewable-energy systems up to two megawatts (MW) in capacity. The PSC rules apply...

55

Net Metering  

Broader source: Energy.gov [DOE]

Rhode Island allows net metering for systems up to five megawatts (MW) in capacity that are designed to generate up to 100% of the electricity that a home or other facility uses. Systems that...

56

Net Metering  

Broader source: Energy.gov [DOE]

Nevada's original net-metering law for renewable-energy systems was enacted in 1997 and amended in 2001, 2003, 2005 and 2007. Systems up to one megawatt (MW) in capacity that generate electricity...

57

Net Metering  

Broader source: Energy.gov [DOE]

[http://www.leg.state.co.us/clics/clics2009a/csl.nsf/fsbillcont3/571064D8... Senate Bill 51] of April 2009 made several changes, effective September 1, 2009, to the state's net metering rules for...

58

Tracking States of Massive Electrical Appliances by Lightweight Metering and Sequence Decoding  

E-Print Network [OSTI]

to track the on/off states of N appliances by deploying only m smart meters on the power load tree, where m demonstrate some interesting structures of the problem. Keywords Energy auditing, Smart meter, Deployment smart meter networks, and thus suffer from the high deploy- ment, maintenance and data collection costs

Wang, Yongcai

59

Development of Baseline Monthly Utility Models, Stabilization of Data Logging Environment and Development of Metering Plan and Shopping List for Fort Hood, Texas  

E-Print Network [OSTI]

sensors) at *ue west substation, and the installation of the ESL's Monitor software for use by the Energy Office at the base. The objective of Task C is to provide a metering plan and shopping list of necessary data points to provide CERL with energy... and EModel, and it was found that EModel gave more accurate modeling results than PRISM, and therefore EModel was used in the analysis. For Task B, a weather station that includes temperature, humidity and solar sensors was installed at the west substation...

Saman, N. F.; Reddy, T. A.; Haberl, J. S.; Claridge, D. E.; Turner, W. D.

1995-01-01T23:59:59.000Z

60

Saturation meter  

DOE Patents [OSTI]

A saturation meter for use in a pressurized water reactor plant comprising a differential pressure transducer having a first and second pressure sensing means and an alarm. The alarm is connected to the transducer and is preset to activate at a level of saturation prior to the formation of a steam void in the reactor vessel.

Gregurech, S.

1984-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Technologie Smart metering Technologie Smart metering  

E-Print Network [OSTI]

Technologie Smart metering Technologie Smart metering 29Bulletin 9/2014 Innovative Dienste mit intelligenten StromzĂ€hlern Standby- und KĂŒhlgerĂ€teverbrauch aus Smart-Meter-Daten Smart Meter ermöglichen weit, kommunikationsfĂ€higen StromzĂ€hlern, fort. Smart Meter ermöglichen eine effizi- entere Rechnungsstellung, da sie Mess

62

Embedded Cyber-Physical Anomaly Detection in Smart Meters  

E-Print Network [OSTI]

Embedded Cyber-Physical Anomaly Detection in Smart Meters Massimiliano Raciti, Simin Nadjm vulnerabilities that arise from deployment of local cyber-physical attacks at a smart metering location at destabilisation. In this paper we study a smart metering device that uses a trusted platform for storage

63

Deployable structures  

E-Print Network [OSTI]

This thesis has the purpose of describing the meaning and applications of deployable structures (making emphasis in the scissor-hinged and sliding mechanisms.) and the development of new geometries, details, and mechanisms ...

Hernández Merchan, Carlos Henrique

1987-01-01T23:59:59.000Z

64

Healthcare Energy Metering Guidance (Brochure)  

SciTech Connect (OSTI)

This brochure is intended to help facility and energy managers plan and prioritize investments in energy metering. It offers healthcare-specific examples of metering applications, benefits, and steps that other health systems can reproduce. It reflects collaborative input from the U.S. Department of Energy national laboratories and the health system members of the DOE Hospital Energy Alliance's Benchmarking and Measurement Project Team.

Not Available

2011-07-01T23:59:59.000Z

65

Q: When planning a wind farm, how are wind resources estimated? And if the average wind speed is known at 10 meters is there a general rule for estimating the wind speed at  

E-Print Network [OSTI]

Q: When planning a wind farm, how are wind resources estimated? And if the average wind speed is known at 10 meters is there a general rule for estimating the wind speed at larger heights above ground level? The wind resource at a wind farm can be estimated in two ways: by measurement or by modeling

66

Modeling EERE Deployment Programs  

SciTech Connect (OSTI)

The purpose of this report is to compile information and conclusions gathered as part of three separate tasks undertaken as part of the overall project, “Modeling EERE Deployment Programs,” sponsored by the Planning, Analysis, and Evaluation office within the Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address improvements to modeling in the near term, and note gaps in knowledge where future research is needed.

Cort, Katherine A.; Hostick, Donna J.; Belzer, David B.; Livingston, Olga V.

2007-11-08T23:59:59.000Z

67

A decision analysis framework to support long-term planning for nuclear fuel cycle technology research, development, demonstration and deployment  

SciTech Connect (OSTI)

To address challenges and gaps in nuclear fuel cycle option assessment and to support research, develop and demonstration programs oriented toward commercial deployment, EPRI (Electric Power Research Institute) is seeking to develop and maintain an independent analysis and assessment capability by building a suite of assessment tools based on a platform of software, simplified relationships, and explicit decision-making and evaluation guidelines. As a demonstration of the decision-support framework, EPRI examines a relatively near-term fuel cycle option, i.e., use of reactor-grade mixed-oxide fuel (MOX) in U.S. light water reactors. The results appear as a list of significant concerns (like cooling of spent fuels, criticality risk...) that have to be taken into account for the final decision.

Sowder, A.G.; Machiels, A.J. [Electric Power Research Institute, 1300 West. W.T Harris Boulevard, Charlotte, NC 28262 (United States); Dykes, A.A.; Johnson, D.H. [ABSG Consulting Inc., 300 Commerce, Suite 200, Irvine, CA 92602 (United States)

2013-07-01T23:59:59.000Z

68

Status and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure  

SciTech Connect (OSTI)

Automobile manufacturers leading the development of mass-market fuel cell vehicles (FCVs) were interviewed in Japan, Korea, Germany and the United States. There is general agreement that the performance of FCVs with respect to durability, cold start, packaging, acceleration, refueling time and range has progressed to the point where vehicles that could be brought to market in 2015 will satisfy customer expectations. However, cost and the lack of refueling infrastructure remain significant barriers. Costs have been dramatically reduced over the past decade, yet are still about twice what appears to be needed for sustainable market success. While all four countries have plans for the early deployment of hydrogen refueling infrastructure, the roles of government, industry and the public in creating a viable hydrogen refueling infrastructure remain unresolved. The existence of an adequate refueling infrastructure and supporting government policies are likely to be the critical factors that determine when and where hydrogen FCVs are brought to market.

Greene, David L [ORNL; Duleep, Gopal [HD Systems

2013-06-01T23:59:59.000Z

69

Community Renewable Energy Deployment Provides Replicable Examples...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

million in funding from DOE for an integrated renewable energy deployment plan using a biogas generation facility and solar photovoltaics (PV) to provide heating, cooling, and...

70

Metering | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

the federal sector has lagged in metering applications. It is not uncommon to find one meter serving hundreds of federal facilities. These master meters make it very difficult to...

71

Kansas- Net Metering  

Broader source: Energy.gov [DOE]

Kansas adopted the Net Metering and Easy Connection Act in May 2009 (see K.S.A. 66-1263 through 66-1271), establishing net metering for customers of investor-owned utilities in Kansas. Net metering...

72

Deploying Innovation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. The Desert Southwest RegionInside IDWebDeploying

73

Outage Detection in Power Distribution Networks with Optimally-Deployed Power Flow Sensors  

E-Print Network [OSTI]

. When two-way communications from the operator and the smart meters are available, AMI polling has been deployed real-time power flow sensors and that of load estimates via Advanced Metering Infrastructure (AMI

Zhao, Yue

74

Smart Metering and Electricity Demand: Technology, Economics and International Experience  

E-Print Network [OSTI]

www.eprg.group.cam.ac.uk E P R G W O R K IN G P A P E R Abstract Smart Metering and Electricity Demand: Technology, Economics and International Experience EPRG Working Paper EPRG0903 Cambridge Working Paper in Economics 0905 Aoife... Brophy Haney, Tooraj Jamasb and Michael G. Pollitt In recent years smart metering of electricity demand has attracted attention around the world. A number of countries and regions have started deploying new metering systems; and many others have...

Brophy Haney, A; Jamasb, Tooraj; Pollitt, Michael G.

75

Net Metering Rules (Arkansas)  

Broader source: Energy.gov [DOE]

The Net Metering Rules are promulgated under the authority of the Arkansas Public Service Commission. These rules are created to establish rules for net energy metering and interconnection. These...

76

Propeller Flow Meter  

E-Print Network [OSTI]

Propeller flow meters are commonly used to measure water flow rate. They can also be used to estimate irrigation water use. This publication explains how to select, install, read and maintain propeller flow meters....

Enciso, Juan; Santistevan, Dean; Hla, Aung K.

2007-10-01T23:59:59.000Z

77

Progress Energy- Net Metering  

Broader source: Energy.gov [DOE]

In August 2009, the South Carolina Public Service Commission issued an order mandating net metering be made available by the regulated electric utilities; the order incorporates a net metering...

78

SRP- Net Metering  

Broader source: Energy.gov [DOE]

Salt River Project (SRP) modified an existing net-metering program for residential and commercial customers in November 2013. Net metering is now available to customers who generate electricity...

79

LADWP- Net Metering (California)  

Broader source: Energy.gov [DOE]

LADWP allows its customers to net meter their photovoltaic (PV), wind, and hybrid systems with a capacity of not more than one megawatt. LADWP will provide the necessary metering equipment unless...

80

Utility Metering- AGL Resources  

Broader source: Energy.gov [DOE]

Presentation—given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting—discusses AGL Resources metering, including interruptible rate customers, large users, and meeting federal metering goals.

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities In Support Marine and Hydrokinetic Energy Deployment: Task 2.1.7 Permitting and Planning Fiscal Year 2012 Year-End Report  

SciTech Connect (OSTI)

This fiscal year 2012 year-end report summarizes activities carried out under DOE Water Power task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the MHK industry, including regulatory and resource management agencies, tribes, NGOs, and industry. Objectives for 2.1.7 are the following: • To work with stakeholders to streamline the MHK regulatory permitting process. • To work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development. • To communicate research findings and directions to the MHK industry and stakeholders. • To engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which are described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning As the MHK industry works with the regulatory community and stakeholders to plan, site, permit and license MHK technologies they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under 2.1.7 is to understand these varied interests, explore mechanisms to reduce conflict, identify efficiencies, and ultimately identify pathways to reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

Geerlofs, Simon H.; Hanna, Luke A.; Judd, Chaeli R.; Blake, Kara M.

2012-09-01T23:59:59.000Z

82

Economics of Energy Metering  

E-Print Network [OSTI]

history of industrial usage and their mechanical simplicity. The Flow Technology Group divided orifice meters into three basic types -- Class A, B, and C. Class A meters are the ultimate current technology can provide. Their overall accuracy is ~l... cost for a Class A orifice is $45,000, excluding the computer cost. Class B meters have an accuracy of +2%. The transmitter analog outputs are usually recorded on charts. These meters are used for utilities accounting and non critical production...

Duncan, J. D.

1979-01-01T23:59:59.000Z

83

RIS-M-2254 ON A RADIOCHROMIC DYE DOSE METER  

E-Print Network [OSTI]

RISĂ?-M-2254 ON A RADIOCHROMIC DYE DOSE METER Arne Miller and William L. McLaughlin Abstract. Radiochromic dye dose meters made of polyvinyl butyral (PVB) with hexa(hydroxyethyl)pararosaniline cyanide (HPR results and outlines plans for further research on this dose meter. Currently the response is found

84

SMART METER PRIVACY USING A RECHARGEABLE BATTERY: MINIMIZING THE RATE OF INFORMATION LEAKAGE  

E-Print Network [OSTI]

SMART METER PRIVACY USING A RECHARGEABLE BATTERY: MINIMIZING THE RATE OF INFORMATION LEAKAGE David. INTRODUCTION Deployments of smart electricity meters to residential homes con- tinue unabated around the world resources. Smart meters are essential to coordinate the desired charging and discharg- ing of the batteries

Khisti, Ashish

85

Designing Privacy-preserving Smart Meters with Low-cost Microcontrollers  

E-Print Network [OSTI]

Designing Privacy-preserving Smart Meters with Low-cost Microcontrollers Andres Molina Microsoft Research Cambridge Abstract. Smart meters that track fine-grained electricity usage and implement smart meter deployment is that fine-grained usage data indirectly reveals detailed information about

Shenoy, Prashant

86

Mobile systems capability plan  

SciTech Connect (OSTI)

This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

NONE

1996-09-01T23:59:59.000Z

87

Net Metering Webinar  

Broader source: Energy.gov [DOE]

Part of the Tribal Renewable Energy Webinar Series, this webinar will focus on the services provided by utility net metering and their importance in making projects cost effective.

88

Energy Metering Audit Procedure  

E-Print Network [OSTI]

Energy Meterilg Audtt Procedure Wiliam S Whitaker Engineering Specialist T X E INC. laPorte Texas INTROOUCI'ION This paper describes the recent audit of the utility distriooticn meters in a petrochanica1 plant. These meters measure the steam..., cx:ndensate, natural gas, water, nitrogen and air flCMS to the different process units within the plant. This audit started as an attellPt to resolve discrepan::ies between the 650 PSIG steam distriootion and supply meters. Theoretically the sum...

Whitaker, W. S.

89

DC attenuation meter  

DOE Patents [OSTI]

A portable, hand-held meter used to measure direct current (DC) attenuation in low impedance electrical signal cables and signal attenuators. A DC voltage is applied to the signal input of the cable and feedback to the control circuit through the signal cable and attenuators. The control circuit adjusts the applied voltage to the cable until the feedback voltage equals the reference voltage. The "units" of applied voltage required at the cable input is the system attenuation value of the cable and attenuators, which makes this meter unique. The meter may be used to calibrate data signal cables, attenuators, and cable-attenuator assemblies.

Hargrove, Douglas L.

2004-09-14T23:59:59.000Z

90

Deployment of Emerging Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the FUPWG Deployment of Emerging Technologies. Presented by Brad Gustafson, Department of Energy, held on November 1, 2006.

91

Net Metering Resources  

Broader source: Energy.gov [DOE]

State net metering policies allow customers to produce onsite electricity and sell excess generation to the utility at a set price, which creates an incentive for private investment in distributed...

92

Guam- Net Metering  

Broader source: Energy.gov [DOE]

Guam's Public Utilities Commission (PUC) reviewed net metering and interconnection during a regular meeting in February 2009 (Docket 08-10). Please contact the [http://www.guampuc.com/ Guam PUC]...

93

Avista Utilities- Net Metering  

Broader source: Energy.gov [DOE]

Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has developed a net...

94

WOOD STREET METERED LOT  

E-Print Network [OSTI]

LOT E1 LOT O WOOD STREET METERED LOT LOT W5 LOT C4 LOT B4 LOT L LOT M MARSHFIELDAVENUE PAULINASTREET Clinical Sciences Building UI Hospital Wood Street Station Clinical Sciences North Grand Grounds Garden

Dai, Yang

95

Ashland Electric- Net Metering  

Broader source: Energy.gov [DOE]

In 1996, Ashland adopted a net-metering program that includes simple interconnection guidelines. The program encourages the adoption of renewable-energy systems by committing the city to purchase,...

96

Idaho Power- Net Metering  

Broader source: Energy.gov [DOE]

Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has developed a net...

97

Puerto Rico- Net Metering  

Broader source: Energy.gov [DOE]

Puerto Rico enacted net-metering legislation in August 2007, allowing customers of Puerto Rico Electric Power Authority (PREPA) to use electricity generated by solar, wind or "other" renewable...

98

Net Metering (Ontario, Canada)  

Broader source: Energy.gov [DOE]

Ontario's net metering regulation allows you to send electricity generated from renewable sources to the electrical grid for a credit toward your energy costs. Here's how it works. Your utility...

99

Private Memoirs of a Smart Meter Andres Molina-Markham, Prashant Shenoy, Kevin Fu, Emmanuel Cecchet, and David Irwin  

E-Print Network [OSTI]

Private Memoirs of a Smart Meter AndrÂŽes Molina-Markham, Prashant Shenoy, Kevin Fu, Emmanuel,shenoy,kevinfu,cecchet,irwin}@cs.umass.edu Abstract Household smart meters that measure power consumption in real-time at fine granularities are the foundation of a future smart electricity grid. However, the widespread deployment of smart meters has serious

Shenoy, Prashant

100

Washington City Power- Net Metering  

Broader source: Energy.gov [DOE]

Washington City adopted a net-metering program, including interconnection procedures, in January 2008.* Net metering is available to residential and commercial customers that generate electricity...

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

ALIGNMENT, LEVELING AND DEPLOYMENT CONSTRAINTS  

E-Print Network [OSTI]

Thermoelectric Generator (RTG) Crew Deployment Description Passive Seismic Experiment (PSE) Crew Deployment and Alignment Central Station Antenna Crew Deployment Description Leveling, Alignment, and Pointing Radioisotope

Rathbun, Julie A.

102

Technology Deployment List | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Technologies Technology Deployment Technology Deployment List Technology Deployment List The Federal Energy Management Program's (FEMP) Technology Deployment List features...

103

Neutron dose equivalent meter  

DOE Patents [OSTI]

A neutron dose equivalent detector for measuring neutron dose capable of accurately responding to neutron energies according to published fluence to dose curves. The neutron dose equivalent meter has an inner sphere of polyethylene, with a middle shell overlying the inner sphere, the middle shell comprising RTV.RTM. silicone (organosiloxane) loaded with boron. An outer shell overlies the middle shell and comprises polyethylene loaded with tungsten. The neutron dose equivalent meter defines a channel through the outer shell, the middle shell, and the inner sphere for accepting a neutron counter tube. The outer shell is loaded with tungsten to provide neutron generation, increasing the neutron dose equivalent meter's response sensitivity above 8 MeV.

Olsher, Richard H. (Los Alamos, NM); Hsu, Hsiao-Hua (Los Alamos, NM); Casson, William H. (Los Alamos, NM); Vasilik, Dennis G. (Los Alamos, NM); Kleck, Jeffrey H. (Menlo Park, CA); Beverding, Anthony (Foster City, CA)

1996-01-01T23:59:59.000Z

104

Efficient Metering Schemes with Pricing  

E-Print Network [OSTI]

Efficient Metering Schemes with Pricing Barbara Masucci Dipartimento di Informatica ed Applicazioni and Pinkas [7] introduced metering schemes. They proposed metering schemes in which any server is able and proposed metering schemes with pricing. In their schemes any server is able to construct a proof which

Stinson, Douglas

105

Silver Spring signs deal to make Sacramento meters smart June 23, 2009 | Camille Ricketts  

E-Print Network [OSTI]

GreenBeat Silver Spring signs deal to make Sacramento meters smart June 23, 2009 | Camille Ricketts Silver Spring Networks, one of the major players in the smart meter space, announced today that it signed a deal with the Sacramento Municipal Utility District to deploy a wireless network connecting smart

Lu, Chenyang

106

Integrated Technology Deployment  

Office of Energy Efficiency and Renewable Energy (EERE)

Integrated technology deployment is a comprehensive approach to implementing solutions that increase the use of energy efficiency and renewable energy technologies. Federal, state, and local...

107

Duke Energy- Net Metering  

Broader source: Energy.gov [DOE]

In August 2009, the South Carolina Public Service Commission issued an [http://dms.psc.sc.gov/pdf/matters/F05030FC-E19A-9225-B838F72EDF4557DC.pdf] order mandating net metering be made available by...

108

Elbow mass flow meter  

DOE Patents [OSTI]

Elbow mass flow meter. The present invention includes a combination of an elbow pressure drop generator and a shunt-type mass flow sensor for providing an output which gives the mass flow rate of a gas that is nearly independent of the density of the gas. For air, the output is also approximately independent of humidity.

McFarland, Andrew R. (College Station, TX); Rodgers, John C. (Santa Fe, NM); Ortiz, Carlos A. (Bryan, TX); Nelson, David C. (Santa Fe, NM)

1994-01-01T23:59:59.000Z

109

Remotely Deployed Virtual Sensors  

E-Print Network [OSTI]

Remotely Deployed Virtual Sensors TR-UTEDGE-2007-010 Sanem Kabadayi Christine Julien © Copyright 2007 The University of Texas at Austin #12;Remotely Deployed Virtual Sensors Sanem Kabadayi that run on mobile client devices connect to the sensors of a multihop sensor network. For emerging

Julien, Christine

110

Flow metering valve  

DOE Patents [OSTI]

An apparatus for metering fluids at high pressures of about 20,000 to 60,000 psi is disclosed. The apparatus includes first and second plates which are positioned adjacent each other to form a valve chamber. The plates are made of materials which have substantially equal elastic properties. One plate has a planar surface area, and the other a recessed surface area defined by periphery and central lips. When the two plates are positioned in adjacent contacting relationship, a valve chamber is formed between the planar surface area and the recessed surface area. Fluid is introduced into the chamber and exits therefrom when a deformation occurs at positions where they no longer form a valve seat. This permits the metering of fluids at high pressures and at slow variable rates. Fluid then exits from the chamber until an applied external force becomes large enough to bring the valve seats back into contact.

Blaedel, Kenneth L. (Dublin, CA)

1985-01-01T23:59:59.000Z

111

Flow metering valve  

DOE Patents [OSTI]

An apparatus for metering fluids at high pressures of about 20,000 to 60,000 psi is disclosed. The apparatus includes first and second plates which are positioned adjacent each other to form a valve chamber. The plates are made of materials which have substantially equal elastic properties. One plate has a planar surface area, and the other a recessed surface area defined by periphery and central lips. When the two plates are positioned in adjacent contacting relationship, a valve chamber is formed between the planar surface area and the recessed surface area. Fluid is introduced into the chamber and exits therefrom when a deformation occurs at positions where they no longer form a valve seat. This permits the metering of fluids at high pressures and at slow variable rates. Fluid then exits from the chamber until an applied external force becomes large enough to bring the valve seats back into contact.

Blaedel, K.L.

1983-11-03T23:59:59.000Z

112

Montana Electric Cooperatives- Net Metering  

Broader source: Energy.gov [DOE]

The Montana Electric Cooperatives' Association (MECA) adopted model interconnection guidelines in 2001 and a revised net-metering policy in September 2008. Net metering is available in whole or...

113

Rocky Mountain Power- Net Metering  

Broader source: Energy.gov [DOE]

Idaho does not have a statewide net-metering policy. However, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has a net-metering...

114

SCE&G- Net Metering  

Broader source: Energy.gov [DOE]

In August 2009, the South Carolina Public Service Commission issued an order mandating net metering be made available by the regulated electric utilities; the order incorporates a net metering...

115

Design study of 8 meter monolithic mirror UV/optical space telescope H. Philip Stahl  

E-Print Network [OSTI]

Design study of 8 meter monolithic mirror UV/optical space telescope H. Philip Stahl NASA Marshall Space Flight Center, Huntsville, AL 35812 ABSTRACT The planned Ares V launch vehicle with its 10 meter to 8 meter class monolithic primary mirror telescope to Sun-Earth L2 using an Ares V. Specific

Sirianni, Marco

116

Portable wastewater flow meter  

DOE Patents [OSTI]

A portable wastewater flow meter particularly adapted for temporary use at a single location in measuring the rate of liquid flow in a circular entrance conduit of a sewer manhole both under free flow and submerged, open channel conditions and under fill pipe, surcharged conditions, comprising an apparatus having a cylindrical external surface and an inner surface that constricts the flow through the apparatus in such a manner that a relationship exists between (1) the difference between the static pressure head of liquid flowing through the entrance of the apparatus and the static pressure head of liquid flowing through the constriction, and (2) the rate of liquid flow through the apparatus.

Hunter, Robert M. (320 S. Wilson Ave., Bozeman, MT 59715)

1999-02-02T23:59:59.000Z

117

Portable wastewater flow meter  

DOE Patents [OSTI]

A portable wastewater flow meter particularly adapted for temporary use at a single location in measuring the rate of liquid flow in a circular entrance conduit of a sewer manhole both under free flow and submerged, open channel conditions and under full pipe, surcharged conditions, comprising an apparatus having a cylindrical external surface and an inner surface that constricts the flow through the apparatus in such a manner that a relationship exists between (1) the difference between the static pressure head of liquid flowing through the entrance of the apparatus and the static pressure head of liquid flowing through the constriction, and (2) the rate of liquid flow through the apparatus.

Hunter, Robert M. (320 S. Wilson Ave., Bozeman, MT 59715)

1990-01-01T23:59:59.000Z

118

Meters Roads N Streams  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping theEnergy StorageAdvancedMetamaterials Researchsc 620 Meters ~0

119

NASA's Metering Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen OwnedofDepartment ofJaredOak Ridgeñ€™s EM programA listing of NAICS codes

120

Remote Systems Design & Deployment  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory (PNNL) was tasked by Washington River Protection Solutions, LLC (WRPS) to provide information and lessons learned relating to the design, development and deployment of remote systems, particularly remote arm/manipulator systems. This report reflects PNNL’s experience with remote systems and lays out the most important activities that need to be completed to successfully design, build, deploy and operate remote systems in radioactive and chemically contaminated environments. It also contains lessons learned from PNNL’s work experiences, and the work of others in the national laboratory complex.

Bailey, Sharon A.; Baker, Carl P.; Valdez, Patrick LJ

2009-08-28T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Los Alamos National Laboratory Tritium Technology Deployments Large Scale Demonstration and Deployment Project  

SciTech Connect (OSTI)

This paper describes the organization, planning and initial implementation of a DOE OST program to deploy proven, cost effective technologies into D&D programs throughout the complex. The primary intent is to accelerate closure of the projects thereby saving considerable funds and at the same time being protective of worker health and the environment. Most of the technologies in the ''toolkit'' for this program have been demonstrated at a DOE site as part of a Large Scale Demonstration and Deployment Project (LSDDP). The Mound Tritium D&D LSDDP served as the base program for the technologies being deployed in this project but other LSDDP demonstrated technologies or ready-for-use commercial technologies will also be considered. The project team will evaluate needs provided by site D&D project managers, match technologies against those needs and rank deployments using a criteria listing. After selecting deployments the project will purchase the equipment and provide a deployment engineer to facilitate the technology implementation. Other cost associated with the use of the technology will be borne by the site including operating staff, safety and health reviews etc. A cost and performance report will be prepared following the deployment to document the results.

McFee, J.; Blauvelt, D.; Stallings, E.; Willms, S.

2002-02-26T23:59:59.000Z

122

City of Brenham- Net Metering  

Broader source: Energy.gov [DOE]

In September 2010, the City of Brenham passed an ordinance adopting net metering and interconnection procedures. Customer generators up to 10 megawatts (MW) are eligible to participate, although...

123

O&M Metering Guidance  

Broader source: Energy.gov (indexed) [DOE]

URL links, and references - Improved document "readability" - Added information regarding water 4 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov O&M and Metering Guidance...

124

Net Metering (New Brunswick, Canada)  

Broader source: Energy.gov [DOE]

The NB Power Net Metering program provides customers with the option to connect their own environmentally sustainable generation unit to NB Power's distribution system. The program allows customers...

125

Deployment & Market Transformation (Brochure)  

SciTech Connect (OSTI)

NREL's deployment and market transformation (D and MT) activities encompass the laboratory's full range of technologies, which span the energy efficiency and renewable energy spectrum. NREL staff educates partners on how they can advance sustainable energy applications and also provides clients with best practices for reducing barriers to innovation and market transformation.

Not Available

2012-04-01T23:59:59.000Z

126

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network [OSTI]

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE 4,900 METERS NYLON LINE, CONTINUOUS 700 METERS KEO 1: DATE: DATE: MOORING: SCOPE: NOAA-PMEL-KE 1.4:1 TC5 METERS 700 METERS WIRE ROPE FAIRING TO 500 METERS TC10 METERS 50 METERS 25 METERS TC TC 75 METERS TC 100 METERS TP 150 METERS TC 200 METERS TC 300 METERS

127

Wavelength meter having elliptical wedge  

DOE Patents [OSTI]

A wavelength meter is disclosed which can determine the wavelength of a laser beam from a laser source within an accuracy range of two parts in 10.sup.8. The wavelength meter has wedge having an elliptically shaped face to the optical path of the laser source and includes interferometer plates which form a vacuum housing.

Hackel, Richard P. (Livermore, CA); Feldman, Mark (Livermore, CA)

1992-01-01T23:59:59.000Z

128

Wavelength meter having elliptical wedge  

DOE Patents [OSTI]

A wavelength meter is disclosed which can determine the wavelength of a laser beam from a laser source within an accuracy range of two parts in 10[sup 8]. The wavelength meter has wedge having an elliptically shaped face to the optical path of the laser source and includes interferometer plates which form a vacuum housing. 7 figs.

Hackel, R.P.; Feldman, M.

1992-12-01T23:59:59.000Z

129

Gerson Recinos Onramp Metering System  

E-Print Network [OSTI]

Gerson Recinos Onramp Metering System Using Arduino and Processing Overview­ For this project I built an Onramp Metering System using Arduino and Processing. The Microcontroller used was Arduino (based on Atmel168) and the programming languages were Processing and Wiring (derivative

Kachroo, Pushkin

130

Impact of orifice metering uncertainties  

SciTech Connect (OSTI)

In a recent utility study, attributed 38% of its unaccounted-for UAF gas to orifice metering uncertainty biasing caused by straightening vanes. How this was determined and how this applied to the company's orifice meters is described. Almost all (97%) of the company's UAF gas was found to be attributed to identifiable accounting procedures, measurement problems, theft and leakage.

Stuart, J.W. (Pacific Gas and Electric Co., San Francisco, CA (USA))

1990-12-01T23:59:59.000Z

131

WINDExchange: Deployment Activities  

Wind Powering America (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative JumpWilliamsonWoodsonCounty iscomfort HomeplannersAboutDeployment

132

Valley Electric Association- Net Metering  

Broader source: Energy.gov [DOE]

The Board of Directors for Valley Electric Association (VEA) approved net metering in April 2008. The rules apply to systems up to 30 kW, though owners of larger systems may be able to negotiate...

133

Grays Harbor PUD- Net Metering  

Broader source: Energy.gov [DOE]

Grays Harbor PUD's net-metering program differs slightly from what is required by Washington state law in that Grays Harbor PUD reimburses customers for net excess generation (NEG), at the end of...

134

Austin Energy- Net Metering (Texas)  

Broader source: Energy.gov [DOE]

Austin Energy, the municipal utility of Austin Texas, offers net metering for renewable energy systems up to 20 kilowatts (kW) to its non-residential retail electricity customers. The definition of...

135

Electric Metering | Department of Energy  

Office of Environmental Management (EM)

has installed meters in the James Forrestal Building that will enable DOE to measure electricity use and costs in its headquarters facility. You may explore this data further by...

136

START USING THE NEW ONLINE METER  

E-Print Network [OSTI]

START USING THE NEW ONLINE METER REQUEST FORM TOOL CAS login Logging in with your Princeton Net and convenient way for departments to send outgoing metered mail with Mail Services! The new Online Meter Request

Singh, Jaswinder Pal

137

Technology Deployment List | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Technology Deployment List Technology Deployment List Spreadsheet details new and underutilized technologies ranked for Federal deployment by the Federal Energy Management Program....

138

Gamma radiation field intensity meter  

DOE Patents [OSTI]

A gamma radiation intensity meter measures dose rate of a radiation field. The gamma radiation intensity meter includes a tritium battery emitting beta rays generating a current which is essentially constant. Dose rate is correlated to an amount of movement of an electroscope element charged by the tritium battery. Ionizing radiation decreases the voltage at the element and causes movement. A bleed resistor is coupled between the electroscope support element or electrode and the ionization chamber wall electrode. 4 figs.

Thacker, L.H.

1995-10-17T23:59:59.000Z

139

Gamma radiation field intensity meter  

DOE Patents [OSTI]

A gamma radiation intensity meter measures dose rate of a radiation field. The gamma radiation intensity meter includes a tritium battery emitting beta rays generating a current which is essentially constant. Dose rate is correlated to an amount of movement of an electroscope element charged by the tritium battery. Ionizing radiation decreases the voltage at the element and causes movement. A bleed resistor is coupled between the electroscope support element or electrode and the ionization chamber wall electrode. 4 figs.

Thacker, L.H.

1994-08-16T23:59:59.000Z

140

Gamma radiation field intensity meter  

DOE Patents [OSTI]

A gamma radiation intensity meter measures dose rate of a radiation field. The gamma radiation intensity meter includes a tritium battery emitting beta rays generating a current which is essentially constant. Dose rate is correlated to an amount of movement of an electroscope element charged by the tritium battery. Ionizing radiation decreases the voltage at the element and causes movement. A bleed resistor is coupled between the electroscope support element or electrode and the ionization chamber wall electrode.

Thacker, Louis H. (Knoxville, TN)

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Gamma radiation field intensity meter  

DOE Patents [OSTI]

A gamma radiation intensity meter measures dose rate of a radiation field. The gamma radiation intensity meter includes a tritium battery emitting beta rays generating a current which is essentially constant. Dose rate is correlated to an amount of movement of an electroscope element charged by the tritium battery. Ionizing radiation decreases the voltage at the element and causes movement. A bleed resistor is coupled between the electroscope support element or electrode and the ionization chamber wall electrode.

Thacker, Louis H. (Knoxville, TN)

1994-01-01T23:59:59.000Z

142

DVS5.2 METERS 8 METERS OCR507, STOR-X DATA LOGGER  

E-Print Network [OSTI]

DVS5.2 METERS 10 METERS 8 METERS OCR507, STOR-X DATA LOGGER 16" BATTERY HOUSING TC INVERTED5 METERS 1" SAS INDUCTIVE CABLE BREAKOUT RADAR REFLECTOR OS PAPA RECOVERY HANDLE 1 METER-SBE 37 MICROCAT TC HUMIDITY (FLEX) CTD/GTD/O2 4 METERS WETLabs FLNTUSB FLUOROMETER DOUBLE NUT AND TORQUE ALL LOAD CELL NUTS

143

BPA Metering Services Editing and Estimating Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Editing and Estimating Interval Data 1. Introduction This section defines the meter interval data editing and estimation techniques performed by BPA's Metering Services...

144

Smart Meter Company Boosting Production, Workforce | Department...  

Broader source: Energy.gov (indexed) [DOE]

Smart Meter Company Boosting Production, Workforce Smart Meter Company Boosting Production, Workforce September 30, 2010 - 10:53am Addthis Kevin Craft What does this mean for me?...

145

Embedded Firmware Diversity for Smart Electric Meters Stephen McLaughlin, Dmitry Podkuiko, Adam Delozier  

E-Print Network [OSTI]

.g., consumer-generated wind and solar energy. Smart meters are the consumer conduit to the grid. Re- placing in use today and hundreds of millions more to be deployed in the next few years. These low-cost ( $50 systems offers substantial benefits for society; increased efficien- cies and information availability can

McDaniel, Patrick Drew

146

AN ELECTRICAL OXYGEN-TEMPERATURE METER  

E-Print Network [OSTI]

426 AN ELECTRICAL OXYGEN-TEMPERATURE METER FOR FISHERY BIOLOGISTS SEP 2 1196: vuUiJo HIM. . SPECIAL and Wildlife, Daniel H. Janzen, Director AN ELECTRICAL OXYGEN-TEMPERATURE METER FOR FISHERY BIOLOGISTS -temperature meter 11 Maintenance and trouble -shooting 12 #12;AN ELECTRICAL OXYGEN-TEMPERATURE METER

147

Hardware Metering: A Survey Farinaz Koushanfar  

E-Print Network [OSTI]

Chapter 1 Hardware Metering: A Survey Farinaz Koushanfar Abstract This chapter provides the first comprehensive overview of hard- ware integrated circuits (IC) protection by metering. Hardware metering, or IC metering refers to mechanisms, methods, and protocols that enable track- ing of the ICs post

148

meter:alittlelonger kilometer:alittlemore  

E-Print Network [OSTI]

Yard Meter meter:alittlelonger thanayard mile kilometer kilometer:alittlemore thanhalfamile gramM1000000 gigaG1000000000 COMMONPREFIXES 1 8765432 9 161514131211101 8765432 9 16151413121110 cm Yard Meter meter:alittlelonger thanayard mile kilometer kilometer:alittlemore thanhalfamile gram

149

Accelerating Combined Heat & Power Deployment  

Broader source: Energy.gov (indexed) [DOE]

ACCELERATING COMBINED HEAT & POWER DEPLOYMENT An Industry Consultation by the United States Energy Association August 31, 2011 Cover Photograph: CHP Plant at the Mueller Energy...

150

2,270 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network [OSTI]

2,270 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METER LENGTH NYLON STIFFENER APPLIED TO 1" NYLON 3/4" SAS EYE INTO EYE SPLICE ACOUSTIC RELEASE 20 METERS 1 1/8" NYLON 5/8" SAS 5/8" SAS 3/4" SAS .5 METER CHAIN 697.4 METERS 7/16" WIRE ROPE 7.1 METERS 10 METERS 37.1 METERS 75 METERS 100 METERS 125 METERS 225

151

Precision metering of germinated seeds  

E-Print Network [OSTI]

actuated by an electrical solenoid was used to mechanically capture individual seeds. Air was used to eject the seeds from the system. A new single file device employing dilution flow was tested at rates as high as ten seeds per second. It produced... distribution was found to adequately represent the data. The metering system was tested at ejection rates ranging from 1. 3 to 4. 5 seeds per second, with most tests at rates between two and three seeds per second. The performance of the metering system...

Elliot, Gregory Lawrence

1990-01-01T23:59:59.000Z

152

Station design using orifice meters  

SciTech Connect (OSTI)

This paper reports that proper meter station design using gas orifice meters must include consideration of a number of factors to minimize operation and maintenance problems while obtaining the best accuracy over the life of the station. A station should provide accuracy, be safe, functional, economical and free of undue maintenance. It should comply with all codes, reports and specifications but most of all it should be able to comply with terms set forth in the contract. All measuring stations should be designed with considerations of growth or reductions in volume. It should be attractive and built to last for many years.

Upp, E.L. (Daniel Industries, Inc., Houston, TX (United States))

1992-07-01T23:59:59.000Z

153

2,309 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network [OSTI]

2,309 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METER LENGTH NYLON STIFFENER APPLIED TO 1" NYLON EYE INTO EYE SPLICE 20 METERS 1 1/8" NYLON 697.4 METERS 7/16" WIRE ROPE 36.1 METERS TC inverted35 METERS 40 METERS 700 METERS 3/4" SAS, Wrench tighten. ** 3/4" SAS WITH BUSHING, Wrench tighten. ** .5

154

Shape Accuracy of a Joint-Dominated Deployable Mast O.R. Stohlman  

E-Print Network [OSTI]

optics held 10 meters away from its detector, requiring accuracy on the order of a millimeter been used to deploy the Mars Odyssey gamma ray spectrometer boom. The recent ST8 SAILMAST5 experiment of NuSTAR spacecraft, with the optics at left and detectors/spacecraft bus at right.6 Graduate student

Pellegrino, Sergio

155

Electrical Metering Equipment and Sensors Appendix D -Electrical Metering Equipment and Sensors  

E-Print Network [OSTI]

Appendix D ­ Electrical Metering Equipment and Sensors #12;D.1 Appendix D - Electrical Metering schedules, and view system status from the convenience of a standard web-browser. D.2 Metering Data Logger

156

Meters  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubeyChallengeMetal & Alloyand RP-1 Agreement

157

Government Program Briefing: Smart Metering  

Office of Energy Efficiency and Renewable Energy (EERE)

This document is adapted and updated from a memo delivered to the City Council of New Orleans, the office of the Mayor of New Orleans, the Chairperson of the Citizen Stakeholders Group (New Orleans Energy Task Force) and the U.S. Department of Energy (DOE) Project Officer in March 2008. This briefing piece provides an overview of the benefits, costs, and challenges of smart metering.

158

Government Program Briefing: Smart Metering  

SciTech Connect (OSTI)

This document is adapted and updated from a memo delivered to the City Council of New Orleans, the office of the Mayor of New Orleans, the Chairperson of the Citizen Stakeholders Group (New Orleans Energy Task Force) and the U.S. Department of Energy (DOE) Project Officer in March 2008. This briefing piece provides an overview of the benefits, costs, and challenges of smart metering.

Doris, E.; Peterson, K.

2011-09-01T23:59:59.000Z

159

Electric Metering | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles » AlternativeUpDrain-Water Heat RecoveryEarnedElectric Metering

160

Metered Mail Form International Mail Only  

E-Print Network [OSTI]

Metered Mail Form International Mail Only Charge to Department USPS First Class Mail International International Metered Mail Form and must be kept separate from all other domestic mail. · International mail

Palmeri, Thomas

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Heating Energy Meter Validation for Apartments  

E-Print Network [OSTI]

Household heat metering is the core of heating system reform. Because of many subjective and objective factors, household heat metering has not been put into practice to a large extent in China. In this article, the research subjects are second...

Cai, B.; Li, D.; Hao, B.

2006-01-01T23:59:59.000Z

162

City of St. George- Net Metering  

Broader source: Energy.gov [DOE]

The St. George City Council adopted a [http://www.sgcity.org/wp/power/NetMeteringPolicy.pdf net-metering program for area utilities], including interconnection procedures, in October 2005.* The...

163

Long Island Power Authority- Net Metering  

Broader source: Energy.gov [DOE]

: Note: In October 2012 the LIPA Board of Trustees adopted changes to the utility's net metering tariff that permit remote net metering for non-residential solar and wind energy systems, and farm...

164

Deploying Emerging Technologies in ESPC  

Broader source: Energy.gov [DOE]

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—discusses emerging technologies and how to deploy them using an energy savings performance contract (ESPC).

165

Rapid deployment intrusion detection system  

SciTech Connect (OSTI)

A rapidly deployable security system is one that provides intrusion detection, assessment, communications, and annunciation capabilities; is easy to install and configure; can be rapidly deployed, and is reusable. A rapidly deployable intrusion detection system (RADIDS) has many potential applications within the DOE Complex: back-up protection for failed zones in a perimeter intrusion detection and assessment system, intrusion detection and assessment capabilities in temporary locations, protection of assets during Complex reconfiguration, and protection in hazardous locations, protection of assets during Complex reconfiguration, and protection in hazardous locations. Many DOE user-need documents have indicated an interest in a rapidly deployable intrusion detection system. The purpose of the RADIDS project is to design, develop, and implement such a system. 2 figs.

Graham, R.H.

1997-08-01T23:59:59.000Z

166

Intelligent Transportation Systems Deployment Statistics Database  

E-Print Network [OSTI]

Intelligent Transportation Systems Deployment Statistics Database Oak Ridge National Laboratory direction. In addition, through the ITS Deployment Tracking web site, the database supports other users in 2010. Users can also download the entire 2010 deployment tracking database through the website

167

Massively Deployed Sensors Final Project Report  

E-Print Network [OSTI]

Massively Deployed Sensors Final Project Report Power Systems Engineering Research Center Systems Engineering Research Center Massively Deployed Sensors Final Project Report Editors Jonathan project titled "Massively Deployed Sensors," PSERC project T-31. We express our appreciation

168

1. A vertical post 2.5-meters high must support a lateral load P = 12 kN at its upper end. Two plans are proposed -a solid wood post and a hollow aluminum tube. (a)  

E-Print Network [OSTI]

plans are proposed -a solid wood post and a hollow aluminum tube. (a) What is the minimum required is the minimum diameter d2of the aluminum tube if its wall thickness is to be one-eight of the outer diameter and the allowable bending stress in the aluminum is 50Mpa ? (20 points) 2. The composite beam shown in figure below

Huang, Haimei

169

Metering Schemes for General Access Structures  

E-Print Network [OSTI]

Metering Schemes for General Access Structures Barbara Masucci Dipartimento di Informatica ed, Canada E­mail: dstinson@cacr.math.uwaterloo.ca Abstract A metering scheme is a method by which an audit time frame. In this paper we construct metering schemes for more general access structures, which

Stinson, Douglas

170

A PHOTOELECTRIC CURRENT METER Marine Biological Laboratory!  

E-Print Network [OSTI]

330 A PHOTOELECTRIC CURRENT METER Marine Biological Laboratory! WOODS HOLE, MASS. SPECIAL CURRENT METER by H. C. Boyar Fishery Research Biologist Bureau of Commercial Fisheries Biological. March 1960 #12;#12;TABLE OF CONTENTS Page Introduction 1 Description and operation of the meter

171

Newport Power Meter Drivers CD Installation Software  

E-Print Network [OSTI]

Newport Power Meter Drivers CD Installation Software Version 2.3.1 Revision Date: October 16, 2008 IMPORTANT NOTES: The USB drivers on your CD must be installed before the Newport Power Meter is connected to your PC (via USB cable). Manual: The latest manuals for the Newport Power Meters can be found

Kleinfeld, David

172

THE ELECTRICAL RESISTIVITY METER IN FISHERY INVESTIGATIONS  

E-Print Network [OSTI]

THE ELECTRICAL RESISTIVITY METER IN FISHERY INVESTIGATIONS I Marine Biological Laboratory! WOODS RESISTIVITY METER IN FISHERY INVESTIGATIONS By Robert E. Lennon Fishery Research Biologist Appalachian Sport) BiblioKiMpliy : p. ]!. 1. Electric meters. 2. Water--Analysis. 3. Electric fishing. I. Title. ( Series

173

Metered Mail Form Domestic Mail Only  

E-Print Network [OSTI]

Metered Mail Form Domestic Mail Only For USPS Mail Only Charge to Department First Class Mail Media Meter Form. · All outgoing USPS Mail that needs postage should be kept separate from all other mail already be sealed prior to being metered. Failure to properly seal this type of mail could result

Palmeri, Thomas

174

Smart Meter Security Infrastructure: Some Observations  

E-Print Network [OSTI]

to infer otherwise-private life-style details of the Smart Meter user. 2 An attacker who can issue on the capa- bility of the device, such an attacker can reset a Smart Meter, cut off electricity supply, access Smart Grid nodes via the Smart Meter, or pretend electricity use that is other than the actual use

Ladkin, Peter B.

175

Privacy-Preserving Smart Metering Alfredo Rial  

E-Print Network [OSTI]

Privacy-Preserving Smart Metering Alfredo Rial K.U.Leuven, ESAT/COSIC & IBBT Leuven, Belgium General Terms Security Keywords Billing, Smart metering, Cryptographic Protocol, Verifiable Computing 1 of smart meter data for more accurate forecasting, Permission to make digital or hard copies of all or part

Bernstein, Phil

176

Community Renewable Energy Deployment Provides Replicable Examples...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Community Renewable Energy Deployment Provides Replicable Examples of Clean Energy Projects Community Renewable Energy Deployment Provides Replicable Examples of Clean Energy...

177

2,275 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network [OSTI]

2,275 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METERS NYLON STIFFENER 3/4" SAS .5 M 1/2" CHAIN 3" GLASS BALL FLOATS on 2.5 M Chain ACOUSTIC RELEASE 20 METERS 1 1/8" NYLON 5/8" SAS 5/8" SAS 3/4" SAS .5 METER CHAIN 5/8" SAS 2 METER CHAIN 697.4 METERS 7/16" WIRE ROPE SONTEK7 METERS 10 METERS 8.3 METERS TV

178

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network [OSTI]

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METERS NYLON STIFFENER 3/4" SAS .5 M 1/2" CHAIN 5 SPLICE 6 ea.17" GLASS BALL FLOATS ACOUSTIC RELEASE 20 METERS 1 1/8" NYLON 5/8" SAS 5/8" SAS 3/4" SAS .5 METER CHAIN 5/8" SAS 2 METER CHAIN TC INVERTED5 METERS 697.4 METERS WIRE ROPE SONTEK7 METERS 10 METERS 8

179

Monitoring the Thermal Power of Nuclear Reactors with a Prototype Cubic Meter Antineutrino Detector  

E-Print Network [OSTI]

In this paper, we estimate how quickly and how precisely a reactor's operational status and thermal power can be monitored over hour to month time scales, using the antineutrino rate as measured by a cubic meter scale detector. Our results are obtained from a detector we have deployed and operated at 25 meter standoff from a reactor core. This prototype can detect a prompt reactor shutdown within five hours, and monitor relative thermal power to three percent within seven days. Monitoring of short-term power changes in this way may be useful in the context of International Atomic Energy Agency's (IAEA) Reactor Safeguards Regime, or other cooperative monitoring regimes.

A. Bernstein; N. S. Bowden; A. Misner; T. Palmer

2008-04-30T23:59:59.000Z

180

Melodic cues to meter 1 Running Head: MELODIC CUES TO METER  

E-Print Network [OSTI]

Melodic cues to meter 1 Running Head: MELODIC CUES TO METER The Role of Melodic and Temporal Cues in Perceiving Musical Meter Erin E. Hannon Cornell University Joel S. Snyder Cornell University Tuomas Eerola-569-4326 Tel: 905-828-5415 E-mail: eeh5@cornell.edu #12;Melodic cues to meter 2 Abstract A number of different

Ahmad, Sajjad

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

ANALYSIS OF HIGH PRESSURE TESTS ON WET GAS FLOW METERING WITH A VENTURI METER  

E-Print Network [OSTI]

ANALYSIS OF HIGH PRESSURE TESTS ON WET GAS FLOW METERING WITH A VENTURI METER P. Gajan , Q, 64018 Pau cedex, France pierre.gajan@onera.fr Abstract This work deals with the flow metering of wet gas on the CEESI facilities are presented. They are performed at 75 bars with 0.6 beta ratio Venturi meter

182

PQMII POWER QUALITY METER INSTRUCTION MANUAL 11 PQMII Power Quality Meter  

E-Print Network [OSTI]

#12;#12;#12;PQMII POWER QUALITY METER ­ INSTRUCTION MANUAL 1­1 PQMII Power Quality Meter Chapter 1 Multilin PQMII Power Quality Meter is an ideal choice for continuous monitoring of a single or three-phase system. It provides metering for current, voltage, real power, reactive power, apparent power, energy use

Meyers, Steven D.

183

Ramp meters on trial: Evidence from the Twin Cities metering holiday  

E-Print Network [OSTI]

Ramp meters on trial: Evidence from the Twin Cities metering holiday David Levinson a,*, Lei Zhang; accepted 15 December 2004 Abstract Ramp meters in the Twin Cities have been the subject of a recent test metering for several representative freeways during the afternoon peak period. Seven performance measures

Levinson, David M.

184

Microsoft Word - CX-Paisley_Meter_08Aug2013.doc  

Broader source: Energy.gov (indexed) [DOE]

inspect SVEC's metering support installations, and install and test a new revenue meter. The new revenue meter would be installed in a fiberglass enclosure and would be wired...

185

Mass Market Demand Response and Variable Generation Integration Issues: A Scoping Study  

E-Print Network [OSTI]

Program Final Report. Smart Meter Pilot Program Inc. ,Fear, loathing and smart meters. Baltimore, MD. Heffner,IEE (2010) Utility-scale Smart Meter Deployments, Plans &

Cappers, Peter

2012-01-01T23:59:59.000Z

186

Impact of Energy Disaggregation on Consumer Behavior  

E-Print Network [OSTI]

2010. Utility Scale Smart Meter Deployments, Plans, &ZigBee radio chips in Smart Meters such that consumers cantime data access from Smart Meters. Millions of these Smart

Chakravarty, Prateek; Gupta, Abahy

2013-01-01T23:59:59.000Z

187

Deployment of Behind-The-Meter Energy Storage for Demand Charge...  

Office of Scientific and Technical Information (OSTI)

It finds that small, short-duration batteries are most cost effective regardless of solar power levels, serving to reduce short load spikes on the order of 2.5% of peak demand....

188

Newberry Seismic Deployment Fieldwork Report  

SciTech Connect (OSTI)

This report summarizes the seismic deployment of Lawrence Livermore National Laboratory (LLNL) Geotech GS-13 short-period seismometers at the Newberry Enhanced Geothermal System (EGS) Demonstration site located in Central Oregon. This Department of Energy (DOE) demonstration project is managed by AltaRock Energy Inc. AltaRock Energy had previously deployed Geospace GS-11D geophones at the Newberry EGS Demonstration site, however the quality of the seismic data was somewhat low. The purpose of the LLNL deployment was to install more sensitive sensors which would record higher quality seismic data for use in future seismic studies, such as ambient noise correlation, matched field processing earthquake detection studies, and general EGS microearthquake studies. For the LLNL deployment, seven three-component seismic stations were installed around the proposed AltaRock Energy stimulation well. The LLNL seismic sensors were connected to AltaRock Energy Gueralp CMG-DM24 digitizers, which are powered by AltaRock Energy solar panels and batteries. The deployment took four days in two phases. In phase I, the sites were identified, a cavity approximately 3 feet deep was dug and a flat concrete pad oriented to true North was made for each site. In phase II, we installed three single component GS-13 seismometers at each site, quality controlled the data to ensure that each station was recording data properly, and filled in each cavity with native soil.

Wang, J; Templeton, D C

2012-03-21T23:59:59.000Z

189

Rational Deployment of CSP Heuristics  

E-Print Network [OSTI]

Heuristics are crucial tools in decreasing search effort in varied fields of AI. In order to be effective, a heuristic must be efficient to compute, as well as provide useful information to the search algorithm. However, some well-known heuristics which do well in reducing backtracking are so heavy that the gain of deploying them in a search algorithm might be outweighed by their overhead. We propose a rational metareasoning approach to decide when to deploy heuristics, using CSP backtracking search as a case study. In particular, a value of information approach is taken to adaptive deployment of solution-count estimation heuristics for value ordering. Empirical results show that indeed the proposed mechanism successfully balances the tradeoff between decreasing backtracking and heuristic computational overhead, resulting in a significant overall search time reduction.

Tolpin, David

2011-01-01T23:59:59.000Z

190

Cameras, PwrMeter,and MultiMeter rfi August 27, 1999 5 FIGURE 3: Power meter birdie with door closed.  

E-Print Network [OSTI]

Cameras, PwrMeter,and MultiMeter rfi August 27, 1999 5 FIGURE 3: Power meter birdie with door closed. Fri Aug 27 23:17:58 1999 phil #12; Cameras, PwrMeter,and MultiMeter rfi August 27, 1999 4 FIGURE 2. Power meter, multimeter birdies with door closed. Fri Aug 27 23:14:06 1999 phil #12; Cameras, PwrMeter

191

Instrument Qualification of Custom Fabricated Water Activity Meter for Hot Cell Use  

SciTech Connect (OSTI)

This report describes a custom fabricated water activity meter and the results of the qualification of this meter as described in the laboratory test plan LAB-PLN-11-00012, Testing and Validation of an Enhanced Acquisition and Control System. It was calibrated against several NaOH solutions of varying concentrations to quantify the accuracy and precision of the instrument at 20 °C and 60 °C. Also, a schematic and parts list of the equipment used to make the water activity meter will be presented in this report.

McCoskey, Jacob K.

2014-01-22T23:59:59.000Z

192

Farmington Electric Utility System- Net Metering  

Broader source: Energy.gov [DOE]

Net metering rules developed by the New Mexico Public Regulation Commission (PRC) apply to the state's investor-owned utilities and electric cooperatives. Municipal utilities, which are not...

193

Ellsworth Air Force Base Advanced Metering Project  

Broader source: Energy.gov [DOE]

Presentation covers the Ellsworth Air Force Base Advanced Metering project and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

194

Proton recoil scintillator neutron rem meter  

DOE Patents [OSTI]

A neutron rem meter utilizing proton recoil and thermal neutron scintillators to provide neutron detection and dose measurement. In using both fast scintillators and a thermal neutron scintillator the meter provides a wide range of sensitivity, uniform directional response, and uniform dose response. The scintillators output light to a photomultiplier tube that produces an electrical signal to an external neutron counter.

Olsher, Richard H. (Los Alamos, NM); Seagraves, David T. (Los Alamos, NM)

2003-01-01T23:59:59.000Z

195

Assessment of Demand Response and Advanced Metering  

E-Print Network [OSTI]

#12;#12;2008 Assessment of Demand Response and Advanced Metering Staff Report Federal Energy metering penetration and potential peak load reduction from demand response have increased since 2006. Significant activity to promote demand response or to remove barriers to demand response occurred at the state

Tesfatsion, Leigh

196

Request for Information: Demonstration and Deployment Strategies...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

regarding bioenergy technology validation to accelerate the deployment of advanced biofuel, bioproducts, and biopower technologies. BETO is specifically interested in...

197

RSG Deployment Case Testing Results  

SciTech Connect (OSTI)

The RSG deployment case design is centered on taking the RSG system and producing a transport case that houses the RSG in a safe and controlled manner for transport. The transport case was driven by two conflicting constraints, first that the case be as light as possible, and second that it meet a stringent list of Military Specified requirements. The design team worked to extract every bit of weight from the design while striving to meet the rigorous Mil-Spec constraints. In the end compromises were made primarily on the specification side to control the overall weight of the transport case. This report outlines the case testing results.

Owsley, Stanley L.; Dodson, Michael G.; Hatchell, Brian K.; Seim, Thomas A.; Alexander, David L.; Hawthorne, Woodrow T.

2005-09-01T23:59:59.000Z

198

Disposable telemetry cable deployment system  

DOE Patents [OSTI]

A disposable telemetry cable deployment system for facilitating information retrieval while drilling a well includes a cable spool adapted for insertion into a drill string and an unarmored fiber optic cable spooled onto the spool cable and having a downhole end and a stinger end. Connected to the cable spool is a rigid stinger which extends through a kelly of the drilling apparatus. A data transmission device for transmitting data to a data acquisition system is disposed either within or on the upper end of the rigid stinger.

Holcomb, David Joseph (Sandia Park, NM)

2000-01-01T23:59:59.000Z

199

AMF Deployment, Steamboat Springs, Colorado  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011Astudies Colorado Steamboat Deployment AMF Home

200

CHP Deployment | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2 (AprilBiden SaysEnergy Office FY144 1.DOE FCHP DeploymentCHP

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

City of New Orleans- Net Metering  

Broader source: Energy.gov [DOE]

In May 2007, the New Orleans City Council adopted net-metering rules that are similar to rules adopted by the Louisiana Public Service Commission (PSC) in November 2005. The City Council's rules...

202

Hydro-Québec Net Metering (Quebec, Canada)  

Broader source: Energy.gov [DOE]

In line with Hydro-Québec's commitment to the environment and sustainable development, Hydro-Québec is supporting self-generation with a new rate offering: the net metering option. This option...

203

Murray City Power- Net Metering Pilot Program  

Broader source: Energy.gov [DOE]

Under a pilot program, Murray City Power offers net metering to customers that generate electricity using photovoltaic (PV), wind-electric or hydroelectric systems with a maximum capacity of 10...

204

U.S. Virgin Islands- Net Metering  

Broader source: Energy.gov [DOE]

In February 2007, the U.S. Virgin Islands Public Services Commission approved a limited net-metering program for residential and commercial photovoltaic (PV), wind-energy or other renewable energy...

205

Working With Your Utility to Obtain Metering Services  

Broader source: Energy.gov [DOE]

Presentation—given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting—covers the government metering requirement, the U.S. Department of Defense (DoD) metering directive, and customer metering services available from utilities.

206

You Can Justify Meters for Your Energy Conservation Program  

E-Print Network [OSTI]

Meters don't save energy' This statement has often concluded a meeting or terminated a budget request leaving the metering proponent feeling frustrated. Such a statement is technically correct when meters are evaluated in the same way as equipment...

Rusnak, J. J.

1981-01-01T23:59:59.000Z

207

Use Meters to Put Teeth into Your Conservation Programs  

E-Print Network [OSTI]

is effective flow metering, but that is a difficult job even in more traditional applications. The problem is compounded by the fact that traditional metering concepts are inadequate for the unique problems presented by retro-metering for in...

Hayes, J. W.; Rusnak, J. J.

1980-01-01T23:59:59.000Z

208

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE  

E-Print Network [OSTI]

2,279 METERS BOUYANT POLYOLEFIN MOORING LINE 10 METERS NYLON STIFFENER 3/4" SAS .5 M 1/2" CHAIN 5 SPLICE 17" GLASS BALL FLOATS 5/8" SAS 5/8" SAS 3 TON SWIVEL ACOUSTIC RELEASE 20 METERS 1 1/8" NYLON 5/8" SAS 5/8" SAS 3/4" SAS .5 METER CHAIN 5/8" SAS 2 METER CHAIN .5 METER CHAIN 3/4" SAS WITH BUSHING TC

209

OTRA-THS MAC to reduce Power Outage Data Collection Latency in a smart meter network  

SciTech Connect (OSTI)

The deployment of advanced metering infrastructure by the electric utilities poses unique communication challenges, particularly as the number of meters per aggregator increases. During a power outage, a smart meter tries to report it instantaneously to the electric utility. In a densely populated residential/industrial locality, it is possible that a large number of smart meters simultaneously try to get access to the communication network to report the power outage. If the number of smart meters is very high of the order of tens of thousands (metropolitan areas), the power outage data flooding can lead to Random Access CHannel (RACH) congestion. Several utilities are considering the use of cellular network for smart meter communications. In 3G/4G cellular networks, RACH congestion not only leads to collisions, retransmissions and increased RACH delays, but also has the potential to disrupt the dedicated traffic flow by increasing the interference levels (3G CDMA). In order to overcome this problem, in this paper we propose a Time Hierarchical Scheme (THS) that reduces the intensity of power outage data flooding and power outage reporting delay by 6/7th, and 17/18th when compared to their respective values without THS. Also, we propose an Optimum Transmission Rate Adaptive (OTRA) MAC to optimize the latency in power outage data collection. The analysis and simulation results presented in this paper show that both the OTRA and THS features of the proposed MAC results in a Power Outage Data Collection Latency (PODCL) that is 1/10th of the 4G LTE PODCL.

Garlapati, Shravan K [ORNL] [ORNL; Kuruganti, Phani Teja [ORNL] [ORNL; Buehrer, Richard M [ORNL] [ORNL; Reed, Jeffrey H [ORNL] [ORNL

2014-01-01T23:59:59.000Z

210

Mobile Traffic Management System Test Deployment  

E-Print Network [OSTI]

BERKELEY Mobile Traf?c Management System Test DeploymentHIGHWAYS MOBILE TRAFFIC MANAGEMENT SYSTEM TEST DEPLOYMENTMobile Transportation Management System (MTMS). This new and

Gerfen, Jeffrey Brian

2005-01-01T23:59:59.000Z

211

Featured Publications on Integrated Technology Deployment  

Office of Energy Efficiency and Renewable Energy (EERE)

Information on the analysis and technical assistance conducted through the integrated deployment effort to help various locations around the world address specific energy challenges. Includes case...

212

Electric Vehicle Charging Infrastructure Deployment Guidelines...  

Open Energy Info (EERE)

Guidelines: British Columbia Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Electric Vehicle Charging Infrastructure Deployment Guidelines: British Columbia Agency...

213

Commercial Building Demonstration and Deployment Overview - 2014...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office's Commercial Building Demonstration and Deployment activities. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs....

214

Grid Engineering for Accelerated Renewable Energy Deployment  

Broader source: Energy.gov [DOE]

The SunShot Grid Engineering for Accelerated Renewable Energy Deployment (GEARED) program supports increased power system research, development, and analytical capacity while simultaneously growing...

215

Solar Power for Deployment in Populated Areas.  

E-Print Network [OSTI]

??The thesis presents background on solar thermal energy and addresses the structural challenges associated with the deployment of concentrating solar power fields in urban areas.… (more)

Hicks, Nathan Andrew

2009-01-01T23:59:59.000Z

216

Buildings Technologies Deployment | Clean energy | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

are successfully deployed to the fullest extent possible. ORNL helps optimize the energy performance of buildings and industrial processes by moving technologies to full use...

217

Current meter data report, September 1980 - December 1980: mooring OTEC-HB  

SciTech Connect (OSTI)

Data tapes contained current meter records from instrumented mooring OTEC-HB near the OTEC-1 site approximately 14 nautical miles northwest of Keahole Point, Island of Hawaii. Deployed in 1345 m of water, the mooring had five Aanderaa RCM-5 current meters, one at each of the following depths: 47 m, 70m, 99m, 154m, and 829 m. Raw data consisted of east-west (U) velocity, north-south (V) velocity, temperature (T), and pressure (P) time series from September 23, 1980, through December 20, 1980, with a recording interval of 15 min. The series (U, V, T) were filtered into various frequency domains, thereby removing very high frequencies and separating tidal oscillations from very low frequencies. Spectral analyses were performed on the nontidal U and V time series.

Roman, T M; Wang, D P

1981-03-01T23:59:59.000Z

218

INSTRUCTION MANUAL digital pH/mV meter  

E-Print Network [OSTI]

INSTRUCTION MANUAL model 701A digital pH/mV meter /r^ ORION RESEARCH #12;contents Introduction 1 701A digital pH/mV meter is the ideal meter for all research and precision measurements with pH and chemical sensing electrodes. In both the absolute and relative mV modes, the meter covers a range of ± 1999

Kleinfeld, David

219

A Scalable Communication Architecture for Advanced Metering Infrastructure  

E-Print Network [OSTI]

, Communication Architecture, Inter-connecting Overlays. I. INTRODUCTION In AMI system, smart meters measure of data is collected from each smart meter every 15 minutes [Bernaudo et al 2010]. In addition, meter data, the connection from the MDMSs to smart meters following the client-server model as normally to be compatible

Paris-Sud XI, Université de

220

SOLVENT DISPERSION AND FLOW METER CALCULATION RESULTS  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) found that the dispersion numbers for the six combinations of CSSX:Next Generation Solvent (NGS) “blend” and pure NGS versus salt solution, caustic wash, and strip aqueous solutions are all good. The dispersion numbers are indications of processability with centrifugal contactors. A comparison of solvent physical and thermal properties shows that the Intek™ solvent flow meter in the plant has a reading biased high versus calibrated flow when NGS is used, versus the standard CSSX solvent. The flow meter, calibrated for CSSX solvent, is predicted to read 2.8 gpm of NGS in a case where the true flow of NGS is 2.16 gpm.

Nash, C.; Fondeur, F.; Peters, T.

2013-06-21T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Liquid metal Flow Meter - Final Report  

SciTech Connect (OSTI)

Measuring the flow of liquid metal presents serious challenges. Current commercially-available flow meters use ultrasonic, electromagnetic, and other technologies to measure flow, but are inadequate for liquid metal flow measurement because of the high temperatures required by most liquid metals. As a result of the reactivity and high temperatures of most liquid metals, corrosion and leakage become very serious safety concerns. The purpose of this project is to develop a flow meter for Lockheed Martin that measures the flow rate of molten metal in a conduit.

Andersen C, Hoogendoom S, Hudson B, Prince J, Teichert K, Wood J, Chase K

2007-01-30T23:59:59.000Z

222

Draft-O-Meter | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent(CRADA and DOWDepartmentDraft-O-Meter Draft-O-Meter

223

Sustainability of Large Photovoltaic Deployment: Environmental Research  

E-Print Network [OSTI]

Sustainability of Large Photovoltaic Deployment: Environmental Research Sustainability of Large Photovoltaic Deployment: Environmental ResearchEnvironmental ResearchEnvironmental Research Vasilis Fthenakis, Cu, Fe) CdSO4 Cd Metal Tellurium Clean Glass Cd Electrowinning Cell Cu Recovery Te Separation from Cd

Homes, Christopher C.

224

PMU Deployment for Optimal State Estimation Performance  

E-Print Network [OSTI]

the benefits from data aggregation. Phasor Measurement Unit (PMU) is such an advanced device capablePMU Deployment for Optimal State Estimation Performance Yue Yang, Student Member IEEE, and Sumit are anticipated; however, due to the high cost of PMU installation, their deployment will continue to be selective

Roy, Sumit

225

Meter scale plasma source for plasma wakefield experiments  

SciTech Connect (OSTI)

High accelerating gradients generated by a high density electron beam moving through plasma has been used to double the energy of the SLAC electron beam [1]. During that experiment, the electron current density was high enough to generate its own plasma without significant head erosion. In the newly commissioned FACET facility at SLAC, the peak current will be lower and without pre-ionization, head erosion will be a significant challenge for the planned experiments. In this work we report on our design of a meter scale plasma source for these experiments to effectively avoid the problem of head erosion. The plasma source is based on a homogeneous metal vapor gas column that is generated in a heat pipe oven [2]. A lithium oven over 30 cm long at densities over 10{sup 17} cm{sup -3} has been constructed and tested at UCLA. The plasma is then generated by coupling a 10 TW short pulse Ti:Sapphire laser into the gas column using an axicon lens setup. The Bessel profile of the axicon setup creates a region of high intensity that can stretch over the full length of the gas column with approximately constant diameter. In this region of high intensity, the alkali metal vapor is ionized through multi-photon ionization process. In this manner, a fully ionized meter scale plasma of uniform density can be formed. Methods for controlling the plasma diameter and length will also be discussed.

Vafaei-Najafabadi, N.; Shaw, J. L.; Marsh, K. A.; Joshi, C.; Hogan, M. J. [Department of Electrical Engineering, University of California Los Angeles, Los Angeles, CA 90095 (United States); SLAC National Accelerator Laboratory, Menlo Park, CA 94025 (United States)

2012-12-21T23:59:59.000Z

226

Algorithms for revenue metering and their evaluation  

E-Print Network [OSTI]

conditions are well accepted among the metering community. But in recent years, due to the increase of non-linear loads, the presence of harmonics in the current and voltage waveforms in the power network has increased notably, and in the future years...

Martinez-Lagunes, Rodrigo

2000-01-01T23:59:59.000Z

227

Monitoring Advanced Metering Infrastructures with Amilyzer  

E-Print Network [OSTI]

-way communications between smart meters and utility control centers. They are a key component of the smart grid mechanisms are part of communication standards such as the ANSI #12;C12.22. While those protective measures detecting intrusions in IT environments have been developed and evaluated. Through the Trustworthy Cyber

Sanders, William H.

228

NATL Grid Map 50-Meter Grid  

E-Print Network [OSTI]

NATL-east NATL Grid Map 50-Meter Grid Locations in NATL can be specified by reference to a grid intervals. Each gridline intersection ("grid point") is identified by its two gridlines (e.g., E5). Each 50x50-m block formed by the gridlines is identified by the grid point in its northwest corner (e

Slatton, Clint

229

Laser Power Meter Large, bright, backlit LCD  

E-Print Network [OSTI]

Laser Power Meter FEATURES · Large, bright, backlit LCD display · Digital accuracy with analog-like movement for laser tuning · Works with thermopile and optical sensors · Intuitive button-driven user COMPATIBILITY · PowerMaxŸ thermal sensors · Optical sensors FieldMaxII-TO Coherent Laser Measurement and Control

Woodall, Jerry M.

230

PNNL Technology Planning and Deployment Group | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories onFocusOski Energy LLC Place: Reno,PEPCO

231

PNNL Technology Planning and Deployment Group | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories onFocusOski Energy LLC Place: Reno,PEPCODeployment) Jump to:

232

2030 Transportation and Mobility Plan  

E-Print Network [OSTI]

sections are as follows: 1. Introduction 2. Bi-State MPO Area Description 3. Planning Horizon Description and Data Projections 4. Long Range Plan Presentation 5. Plan Implementation and Monitoring Procedures 6. Bi-State MPO 2030 Transportation..., improved access at the Leigh Avenue/I-540 interchange, and the deployment of appropriate Intelligent Transportation Systems (ITS) projects. The Airport Master Plan Update has estimated a total airport improvement cost of $ 74,170,000 over a Three (3...

Bi-State Metropolitan Planning Organization

2006-08-11T23:59:59.000Z

233

Demonstration and Deployment Strategy Workshop: Summary  

Broader source: Energy.gov [DOE]

This report is based on the proceedings of the U.S. DOE’s Bioenergy Technologies Office Demonstration and Deployment Strategy Workshop, held on March 12–13, 2014, at Argonne National Laboratory.

234

Deployment of EVs in the Federal Fleet  

Broader source: Energy.gov [DOE]

Presentation covers the Deployment of EV's in the Federal Fleet and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

235

Fuel cell membrane hydration and fluid metering  

DOE Patents [OSTI]

A hydration system includes fuel cell fluid flow plate(s) and injection port(s). Each plate has flow channel(s) with respective inlet(s) for receiving respective portion(s) of a given stream of reactant fluid for a fuel cell. Each injection port injects a portion of liquid water directly into its respective flow channel. This serves to hydrate at least corresponding part(s) of a given membrane of the corresponding fuel cell(s). The hydration system may be augmented by a metering system including flow regulator(s). Each flow regulator meters an injecting at inlet(s) of each plate of respective portions of liquid into respective portion(s) of a given stream of fluid by corresponding injection port(s).

Jones, Daniel O. (Glenville, NY); Walsh, Michael M. (Fairfield, CT)

2003-01-01T23:59:59.000Z

236

State perspectives on clean coal technology deployment  

SciTech Connect (OSTI)

State governments have been funding partners in the Clean Coal Technology program since its beginnings. Today, regulatory and market uncertainties and tight budgets have reduced state investment in energy R and D, but states have developed program initiatives in support of deployment. State officials think that the federal government must continue to support these technologies in the deployment phase. Discussions of national energy policy must include attention to the Clean Coal Technology program and its accomplishments.

Moreland, T. [State of Illinois Washington Office, Washington, DC (United States)

1997-12-31T23:59:59.000Z

237

Resonant speed meter for gravitational wave detection  

E-Print Network [OSTI]

Gravitational-wave detectors have been well developed and operated with high sensitivity. However, they still suffer from mirror displacement noise. In this paper, we propose a resonant speed meter, as a displacement noise-canceled configuration based on a ring-shaped synchronous recycling interferometer. The remarkable feature of this interferometer is that, at certain frequencies, gravitational-wave signals are amplified, while displacement noises are not.

Atsushi Nishizawa; Seiji Kawamura; Masa-aki Sakagami

2008-05-01T23:59:59.000Z

238

Two-Meter Temperature Surveys for Geothermal Exploration Project...  

Open Energy Info (EERE)

Two-Meter Temperature Surveys for Geothermal Exploration Project at NAS Fallon Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Two-Meter...

239

The Need for Essential Consumer Protections: Smart metering proposals...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

metering proposals and the move to time-based pricing. August 2010 The Need for Essential Consumer Protections: Smart metering proposals and the move to time-based pricing. August...

240

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations...  

Broader source: Energy.gov (indexed) [DOE]

ARRA Program Celebrates Milestone 600,000 Smart Meter Installations ARRA Program Celebrates Milestone 600,000 Smart Meter Installations April 17, 2012 - 3:09pm Addthis On April 11,...

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Wireless Electricity Metering of Miscellaneous and Electronic Devices in Buildings  

E-Print Network [OSTI]

Wireless Electricity Metering of Miscellaneous and Electronic Devices in Buildings, University of California, Berkeley, USA Abstract- Miscellaneous and electronic devices hundreds of miscellaneous and electronic devices where metered for several months

Culler, David E.

242

Secretary Chu Announces Two Million Smart Grid Meters Installed...  

Energy Savers [EERE]

Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am Addthis Columbus, OH - At an...

243

Microsoft Word - CX -Lewis County PUD metering_.doc  

Broader source: Energy.gov (indexed) [DOE]

of meter data at 5 minute intervals is required of BPA Slice customers to perform power scheduling. In order to provide this data, BPA needs to install meter equipment by January...

244

Solar Photovoltaic Financing: Deployment on Public Property by...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Solar Photovoltaic Financing: Deployment on Public Property by State and Local Governments Solar Photovoltaic Financing: Deployment on Public Property by State and Local...

245

Development and Deployment of Advanced Emission Controls for...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Deployment of Advanced Emission Controls for the Retrofit Market Development and Deployment of Advanced Emission Controls for the Retrofit Market 2003 DEER Conference Presentation:...

246

Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues This presentation by...

247

Federal Technology Deployment Pilot: Exterior Solid State Lighting...  

Energy Savers [EERE]

Federal Technology Deployment Pilot: Exterior Solid State Lighting Federal Technology Deployment Pilot: Exterior Solid State Lighting Presentation-given at the Fall 2011 Federal...

248

Energy Department Actions to Deploy Combined Heat and Power,...  

Broader source: Energy.gov (indexed) [DOE]

Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency October 21, 2013 -...

249

Energy Department Selects 11 Tribal Communities to Deploy Energy...  

Energy Savers [EERE]

Selects 11 Tribal Communities to Deploy Energy Efficiency and Renewable Energy Technologies Energy Department Selects 11 Tribal Communities to Deploy Energy Efficiency and...

250

Deployment Barriers to Distributed Wind Energy: Workshop Report...  

Energy Savers [EERE]

Deployment Barriers to Distributed Wind Energy: Workshop Report, October 28, 2010 Deployment Barriers to Distributed Wind Energy: Workshop Report, October 28, 2010 This report...

251

A Buildings Module for the Stochastic Energy Deployment System  

E-Print Network [OSTI]

Stochastic Energy Deployment System Chris Marnay a , Michael Stadler a, b , SamStochastic Energy Deployment System 1 Chris Marnay a) , Michael Stadler a),b) , Sam

Marnay, Chris

2008-01-01T23:59:59.000Z

252

Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal Systems Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal Systems May 16, 2013 - 12:00am Addthis...

253

Alternative Fuels Data Center: Smith Dairy Deploys Natural Gas...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Smith Dairy Deploys Natural Gas Vehicles and Fueling Infrastructure in the Midwest to someone by E-mail Share Alternative Fuels Data Center: Smith Dairy Deploys Natural Gas...

254

Synchrophasor Technologies and their Deployment in the Recovery...  

Energy Savers [EERE]

Synchrophasor Technologies and their Deployment in the Recovery Act Smart Grid Programs (August 2013) Synchrophasor Technologies and their Deployment in the Recovery Act Smart Grid...

255

Plans, Implementation, and Results  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

256

Energy Secretary Chu Announces Five Million Smart Meters Installed...  

Office of Environmental Management (EM)

metering infrastructure (AMI), distribution automation technologies, new electricity pricing programs, and advanced monitoring equipment for the transmission system. The goal...

257

Author's personal copy Ramp metering and freeway bottleneck capacity  

E-Print Network [OSTI]

; Hall and Agyemang-Duah, 1991; Banks, 1991a,b). The two-capacity hypothesis argues that metering can

Levinson, David M.

258

Shared Signals: Using Existing Facility Meters for Energy Savings Verification  

E-Print Network [OSTI]

energy conservation projects. (2) These guidelines provide monitoring and verification options that have different levels of accuracy and cost. They are specifically designed for energy savings performance contracts and are designed to provide... with a fair degree of accuracy. The costs of using existing meters are often not as clear. Obviously, if an existing meter is used, the costs of purchasing new metering equipment is avoided. However, using an existing meter is not free of costs...

McBride, J. R.; Bohmer, C. J.; Price, S. D.; Carlson, K.; Lopez, J.

259

ONE GEV BEAM ACCELERATION IN A ONE METER LONG  

E-Print Network [OSTI]

ONE GEV BEAM ACCELERATION IN A ONE METER LONG PLASMA CELL A Proposal to the Stanford Linear. A single SLC bunch is used to both induce wakefields in the one meter long plasma and to witness that are needed to apply high-gradient plasma wakefield acceleration to large scale accelerators. The one meter

260

Model 1918-C Hand-held Optical Meter  

E-Print Network [OSTI]

Model 1918-C Hand-held Optical Meter Start Up Guide #12;Start Up Guide 1 First printing 2006 © 2006, including safety precautions and start up procedures, needed to get your new optical meter up and running the use and operation of the optical meter is included in the complete User's Manual. The complete User

Kleinfeld, David

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Math for Poets and Drummers The Mathematics of Meter  

E-Print Network [OSTI]

Math for Poets and Drummers The Mathematics of Meter Rachel Hall Saint Joseph's University 5600 a number of problems that are explored in class. In English and Spanish, the rhythm, or meter, of a piece- speare are written in the meter called iambic pentameter: five pairs of alternating unstressed

Hall, Rachel W.

262

Arnold Schwarzenegger TIME-OF-USE WATER METER EFFECTS  

E-Print Network [OSTI]

Arnold Schwarzenegger Governor TIME-OF-USE WATER METER EFFECTS ON CUSTOMER WATER USE; Master Meter Ed Amelung; Southern California Edison Company ­ Matt Garcia, Curtis DeWoody, and James · Transportation TimeofUse Water Meter Impacts on Customer Water Use is the final report for the project 500 07022

263

HOMOMORPHIC PRIMITIVES FOR A PRIVACY-FRIENDLY SMART METERING ARCHITECTURE  

E-Print Network [OSTI]

HOMOMORPHIC PRIMITIVES FOR A PRIVACY-FRIENDLY SMART METERING ARCHITECTURE Benjamin Vetter1 , Osman.lastname}@haw-hamburg.de, {firstname.lastname}@uni-paderborn.de Keywords: PET for smart metering, homomorphic MACs, homomorphic encryption Abstract: We propose a privacy-friendly smart metering architecture which is yet flexible enough

Hellebrand, Sybille

264

Optimal Privacy-Preserving Energy Management for Smart Meters  

E-Print Network [OSTI]

Optimal Privacy-Preserving Energy Management for Smart Meters Lei Yang, Xu Chen, Junshan Zhang Abstract--Smart meters, designed for information collection and system monitoring in smart grid, report a tradeoff between the smart meter data privacy and the electricity bill. In general, a major challenge

Reisslein, Martin

265

Security and Smart Metering Sophia Kaplantzis and Y. Ahmet Sekercioglu  

E-Print Network [OSTI]

Security and Smart Metering Sophia Kaplantzis and Y. Ahmet Sžekercioglu Department of Electrical the transmission network, to the suppliers back office. It encompasses concepts such as smart metering, smart does this threat translate to smart metering applications? In this article, we focus on the security

Sekercioglu, Y. Ahmet

266

Privacy Preserving Smart Metering System Based Retail Level Electricity Market  

E-Print Network [OSTI]

1 Privacy Preserving Smart Metering System Based Retail Level Electricity Market Cory Thoma, Tao Cui, Student Member, IEEE, Franz Franchetti, Member, IEEE Abstract--Smart metering systems multi-party compu- tation (SMC) based privacy preserving smart metering system. Using the proposed SMC

Franchetti, Franz

267

Secure Multiparty Computation Based Privacy Preserving Smart Metering System  

E-Print Network [OSTI]

Secure Multiparty Computation Based Privacy Preserving Smart Metering System Cory Thoma Information Ave. Pittsburgh, PA 15213 Email: {tcui,franzf}@ece.cmu.edu Abstract--Smart metering systems provide privacy preserving protocol for smart meter based load management. Using SMC and a proper designed

Franchetti, Franz

268

Smart Meter Aware Domestic Energy Trading Agents Nicola Capodieci  

E-Print Network [OSTI]

Smart Meter Aware Domestic Energy Trading Agents Nicola Capodieci University of Modena and RE illustrate an implementation includ- ing the interfacing with a physical Smart Meter and provide initial--Intelligent agents, Multiagent systems General Terms Design, Economy Keywords Energy trade, agents, smart meter 1

Aiello, Marco

269

Leveraging smart meter data to recognize home appliances Markus Weiss+#  

E-Print Network [OSTI]

Leveraging smart meter data to recognize home appliances Markus Weiss+# , Adrian Helfenstein -- The worldwide adoption of smart meters that measure and communicate residential electricity consumption gives demand. In this paper we present an infrastructure and a set of algorithms that make use of smart meters

270

Security Architecture of Smart Metering Systems Natasa Zivic1  

E-Print Network [OSTI]

Security Architecture of Smart Metering Systems Natasa Zivic1 and Christoph Ruland1 1 University.Zivic, Christoph.Ruland}@uni-siegen.de Abstract. The main goals of smart metering are the reduction of costs dynamically the power generation and distribution to the requested energy by smart grids. Metering devices

Boyer, Edmond

271

Engineering task plan for flammable gas atmosphere mobile color video camera systems  

SciTech Connect (OSTI)

This Engineering Task Plan (ETP) describes the design, fabrication, assembly, and testing of the mobile video camera systems. The color video camera systems will be used to observe and record the activities within the vapor space of a tank on a limited exposure basis. The units will be fully mobile and designed for operation in the single-shell flammable gas producing tanks. The objective of this tank is to provide two mobile camera systems for use in flammable gas producing single-shell tanks (SSTs) for the Flammable Gas Tank Safety Program. The camera systems will provide observation, video recording, and monitoring of the activities that occur in the vapor space of applied tanks. The camera systems will be designed to be totally mobile, capable of deployment up to 6.1 meters into a 4 inch (minimum) riser.

Kohlman, E.H.

1995-01-25T23:59:59.000Z

272

Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); November 2011 Composite Data Products - Deployment (Presentation)  

SciTech Connect (OSTI)

This presentation is about the Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA). November 2011 Composite Data Products - Deployment November 30, 2011.

Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.

2012-06-01T23:59:59.000Z

273

Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); Quarter 1 2012 Composite Data Products - Deployment (Presentation)  

SciTech Connect (OSTI)

This presentation is about the Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA). Quarter 1 2012 Composite Data Products - Deployment March 8, 2012.

Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.

2012-06-01T23:59:59.000Z

274

Environmental issues affecting clean coal technology deployment  

SciTech Connect (OSTI)

The author outlines what he considers to be the key environmental issues affecting Clean Coal Technology (CCT) deployment both in the US and internationally. Since the international issues are difficult to characterize given different environmental drivers in various countries and regions, the primary focus of his remarks is on US deployment. However, he makes some general remarks, particularly regarding the environmental issues in developing vs. developed countries and how these issues may affect CCT deployment. Further, how environment affects deployment depends on which particular type of clean coal technology one is addressing. It is not the author`s intention to mention many specific technologies other than to use them for the purposes of example. He generally categorizes CCTs into four groups since environment is likely to affect deployment for each category somewhat differently. These four categories are: Precombustion technologies such as coal cleaning; Combustion technologies such as low NOx burners; Postcombustion technologies such as FGD systems and postcombustion NOx control; and New generation technologies such as gasification and fluidized bed combustion.

Miller, M.J. [Electric Power Research Inst., Palo Alto, CA (United States)

1997-12-31T23:59:59.000Z

275

Smart-Metering for Monitoring Building Power Distribution Network using Instantaneous Phasor Computations of Electrical Signals  

E-Print Network [OSTI]

efficient operation of a smart meter network . in IndustrialGood standards for smart meters . in European EnergyHardware development for Smart Meter based innovations . in

K.R., Krishnanand

2013-01-01T23:59:59.000Z

276

E-Print Network 3.0 - advanced metering techniques Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in the Advanced Metering Infrastructure Stephen McLaughlin, Dmitry Podkuiko... of the smart grid is an advanced metering infrastructure (AMI). AMI replaces the analog meters......

277

Weak measurements with a qubit meter  

E-Print Network [OSTI]

We derive schemes to measure the so-called weak values of quantum system observables by coupling of the system to a qubit meter system. We highlight, in particular, the meaning of the imaginary part of the weak values, and show how it can be measured directly on equal footing with the real part of the weak value. We present compact expressions for the weak value of single qubit observables and of product observables on qubit pairs. Experimental studies of the results are suggested with cold trapped ions.

Shengjun Wu; Klaus Műlmer

2009-11-13T23:59:59.000Z

278

Smart Meters | OpenEI Community  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar PowerstoriesNrelPartnerTypePonsa, Mallorca:upGuidebook Jump to:SmarrMeters Home

279

Federal Metering Requirements | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPCofConstructionofFYOxideof1 DOEFederalIncentives forMetering

280

Power Metering Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil'sof Energy Jun Luof EmergencyMetering Project Power

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Metering Technology Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte GmbH Jump to: navigation,Metalysis Jump to:Dec 2005TananaMetering

282

Deploying Darter A Cray XC30 System  

SciTech Connect (OSTI)

TheUniversityofTennessee,KnoxvilleacquiredaCrayXC30 supercomputer, called Darter, with a peak performance of 248.9 Ter- aflops. Darter was deployed in late March of 2013 with a very aggressive production timeline - the system was deployed, accepted, and placed into production in only 2 weeks. The Spring Experiment for the Center for Analysis and Prediction of Storms (CAPS) largely drove the accelerated timeline, as the experiment was scheduled to start in mid-April. The Consortium for Advanced Simulation of Light Water Reactors (CASL) project also needed access and was able to meet their tight deadlines on the newly acquired XC30. Darter s accelerated deployment and op- erations schedule resulted in substantial scientific impacts within the re- search community as well as immediate real-world impacts such as early severe tornado warnings

Fahey, Mark R [ORNL] [ORNL; Budiardja, Reuben D [ORNL] [ORNL; Crosby, Lonnie D [ORNL] [ORNL; McNally, Stephen T [ORNL] [ORNL

2014-01-01T23:59:59.000Z

283

Reliable Process for Security Policy Deployment  

E-Print Network [OSTI]

We focus in this paper on the problem of configuring and managing network security devices, such as Firewalls, Virtual Private Network (VPN) tunnels, and Intrusion Detection Systems (IDSs). Our proposal is the following. First, we formally specify the security requirements of a given system by using an expressive access control model. As a result, we obtain an abstract security policy, which is free of ambiguities, redundancies or unnecessary details. Second, we deploy such an abstract policy through a set of automatic compilations into the security devices of the system. This proposed deployment process not only simplifies the security administrator's job, but also guarantees a resulting configuration free of anomalies and/or inconsistencies.

Preda, Stere; Cuppens, Frederic; Garcia-Alfaro, Joaquin; Toutain, Laurent

2009-01-01T23:59:59.000Z

284

Preserving Privacy in RFID Deployment RVSOcc0401  

E-Print Network [OSTI]

Preserving Privacy in RFID Deployment RVS­Occ­04­01 RVS, Faculty of Technology, University that can preserve privacy. Background RFID technology has its roots in early ``friend or foe'' detection of Bielefeld Jan E. Hennig # Bielefeld, 2004­03­23 Radio Frequency Identification, RFID, is an item

Ladkin, Peter B.

285

Programming, Composing, Deploying for the Grid  

E-Print Network [OSTI]

Programming, Composing, Deploying for the Grid Laurent Baduel, Franžcoise Baude, Denis Caromel FirstName.LastName@sophia.inria.fr Abstract. Grids raise new challenges in the following way: heterogene objects and components. We especially target Grid computing, but our approach also applies to application

Paris-Sud XI, Université de

286

2,363 METERS BOUYANT 7/8" POLYOLEFIN MOORING LINE  

E-Print Network [OSTI]

2,363 METERS BOUYANT 7/8" POLYOLEFIN MOORING LINE 10 METER LENGTH NYLON STIFFENER APPLIED TO TOP OF 1" NYLON EYE INTO EYE SPLICE 20 METERS 1 1/8" NYLON 697.4 METERS 7/16" WIRE ROPE 35 METERS 40 METERS 700 METERS 3/4" SAS, Wrench tighten. ** 3/4" SAS WITH BUSHING, Wrench tighten. ** .5 METER 1/2" CHAIN

287

Deployment of ITS: A Summary of the 2010 National Survey Results  

SciTech Connect (OSTI)

This report presents summary results of the 2010 ITS Deployment Tracking survey, the most recent survey conducted by the ITS Deployment Tracking Project. The U.S. Department of Transportation and its member agencies, including the Research and Innovative Technology Administration, have pursued a research and development agenda, the Intelligent Transportation System (ITS) Program, designed to integrate the latest in information technologies to improve the safety, mobility, and reliability of surface transportation modes. Within metropolitan areas, implementation of these advanced technologies has been accomplished by a variety of state and local transportation and emergency management agencies as well as the private sector. In order to measure the rate of ITS deployment within the nation s largest metropolitan areas, the ITS Deployment Tracking Project has conducted a nationwide survey of state and local transportation and emergency management agencies nearly every year since 1997. The results presented in this report are intended to be a summary of the entire database from the 2010 survey. Access to the complete survey results and previous national surveys are available on-line at http://www.itsdeployment.its.dot.gov. The website also provides access to survey results in the form of downloadable reports, including a survey summary for each survey type and fact sheets. Nearly 1,600 surveys were distributed to state and local transportation agencies in 2010. A total of seven (7) survey types were distributed including: Freeway Management, Arterial Management, Transit Management, Transportation Management Center (TMC), Electronic Toll Collection (ETC), Public Safety Law Enforcement, and Public Safety Fire/Rescue. Among other things, the data collection results indicate that ITS has moved from being experimental to mainstream and interest in continuing investments in ITS continues to be very strong. When asked about future deployment plans, one-third to three-fourths of the different agency types report they will expand current deployments and about half are planning to invest in new technologies over the next three years.

Gordon, Stephen Reed [ORNL; Trombly, Jeff [Science Applications International Corporation (SAIC), Oak Ridge, TN

2011-08-01T23:59:59.000Z

288

Method and apparatus for reading meters from a video image  

DOE Patents [OSTI]

A method and system to enable acquisition of data about an environment from one or more meters using video images. One or more meters are imaged by a video camera and the video signal is digitized. Then, each region of the digital image which corresponds to the indicator of the meter is calibrated and the video signal is analyzed to determine the value indicated by each meter indicator. Finally, from the value indicated by each meter indicator in the calibrated region, a meter reading is generated. The method and system offer the advantages of automatic data collection in a relatively non-intrusive manner without making any complicated or expensive electronic connections, and without requiring intensive manpower.

Lewis, Trevor J. (Irwin, PA); Ferguson, Jeffrey J. (North Huntingdon, PA)

1997-01-01T23:59:59.000Z

289

Test procedures help ensure accuracy of orifice meters  

SciTech Connect (OSTI)

Orifice meter measurement with a chart recorder has been a standard in the petroleum industry for years. The meter consists of the plate/tube and recorder, requires minimal maintenance and can accurately measure a wide range of flow rates. It must be routinely tested to ensure sustained accuracy. The orifice meter measures differential pressure, static pressure, and temperature. However, the accuracy of the measurement is only as good as the calibration devices used in the test. A typical meter test consists of meter calibration, orifice plate inspection, quality of gas tests, and documentation (test report) to verify the data. The paper describes 19 steps that a gas technician can follow to conduct a thorough meter test.

Fillman, C.R. [Coastal Flow Measurement, Inc., Houston, TX (United States)

1996-07-01T23:59:59.000Z

290

2,349 METERS BOUYANT 7/8" POLYOLEFIN MOORING LINE  

E-Print Network [OSTI]

2,349 METERS BOUYANT 7/8" POLYOLEFIN MOORING LINE 10 METER LENGTH NYLON STIFFENER APPLIED TO 1" NYLON EYE INTO EYE SPLICE 697.4 METERS 7/16" WIRE ROPE 40 METERS 700 METERS 3/4" SAS, Wrench tighten. ** 3/4" SAS WITH BUSHING, Wrench tighten. ** .5 METER 1/2" CHAIN 5 TON SWIVEL INDUCTIVE CABLE BREAKOUT

291

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

292

Basic DC Meter Design ECE 2100 Circuit Analysis Laboratory  

E-Print Network [OSTI]

Basic DC Meter Design ECE 2100 Circuit Analysis Laboratory updated 8 January 2008 Pre-Laboratory Assignment 1. Design an ammeter with full scale current IFS equal to 5 mA using a meter movement rated at 0.5 mA and 100 mV. 2. Design a voltmeter with a full scale voltage VFS equal to 10 V using the meter

Miller, Damon A.

293

Maritime Electric- Net Metering (Prince Edward Island, Canada)  

Broader source: Energy.gov [DOE]

In December 2005 The Renewable Energy Act and associated Regulations came into effect. A Government policy objective incorporated in the Act was the introduction of net metering for...

294

Wavelength meter having single mode fiber optics multiplexed inputs  

DOE Patents [OSTI]

A wavelength meter having a single mode fiber optics input is disclosed. The single mode fiber enables a plurality of laser beams to be multiplexed to form a multiplexed input to the wavelength meter. The wavelength meter can provide a determination of the wavelength of any one or all of the plurality of laser beams by suitable processing. Another aspect of the present invention is that one of the laser beams could be a known reference laser having a predetermined wavelength. Hence, the improved wavelength meter can provide an on-line calibration capability with the reference laser input as one of the plurality of laser beams.

Hackel, R.P.; Paris, R.D.; Feldman, M.

1993-02-23T23:59:59.000Z

295

Cost benefit analysis for the implementation of smart metering...  

Open Energy Info (EERE)

Categories: Smart Grid Projects Smart Grid Projects in Europe Smart Grid Projects - Smart Meter and AMI Smart Grid Projects - Home application Smart Grid Projects - Customer...

296

Optimization Online - A Security Framework for Smart Metering with ...  

E-Print Network [OSTI]

Dec 5, 2011 ... Abstract: The increasing diffusion of Automatic Meter Reading (AMR) has raised many concerns about the protection of personal data related to ...

Cristina Rottondi

2011-12-05T23:59:59.000Z

297

Scotia Energy Electricity- Net Metering Program (Nova Scotia, Canada)  

Broader source: Energy.gov [DOE]

Nova Scotia Power Inc. Net Metering allows residential and commercial customers to connect small, renewable energy generating units to the provincial power grid.

298

Pantex installs new meters to help to reduce energy consumption...  

National Nuclear Security Administration (NNSA)

installs new meters to help to reduce energy consumption | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

299

Wavelength meter having single mode fiber optics multiplexed inputs  

DOE Patents [OSTI]

A wavelength meter having a single mode fiber optics input is disclosed. The single mode fiber enables a plurality of laser beams to be multiplexed to form a multiplexed input to the wavelength meter. The wavelength meter can provide a determination of the wavelength of any one or all of the plurality of laser beams by suitable processing. Another aspect of the present invention is that one of the laser beams could be a known reference laser having a predetermined wavelength. Hence, the improved wavelength meter can provide an on-line calibration capability with the reference laser input as one of the plurality of laser beams.

Hackel, Richard P. (Livermore, CA); Paris, Robert D. (San Ramon, CA); Feldman, Mark (Pleasanton, CA)

1993-01-01T23:59:59.000Z

300

Metering Best Practices: A Guide to Achieving Utility Resource...  

Broader source: Energy.gov (indexed) [DOE]

Policy Act of 2005. mbpg.pdf More Documents & Publications Operations & Maintenance Best Practices Guide: Chapter 8 Guidance for Electric Metering in Federal Buildings...

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Design of a speed meter interferometer proof-of-principle experiment  

E-Print Network [OSTI]

The second generation of large scale interferometric gravitational wave detectors will be limited by quantum noise over a wide frequency range in their detection band. Further sensitivity improvements for future upgrades or new detectors beyond the second generation motivate the development of measurement schemes to mitigate the impact of quantum noise in these instruments. Two strands of development are being pursued to reach this goal, focusing both on modifications of the well-established Michelson detector configuration and development of different detector topologies. In this paper, we present the design of the world's first Sagnac speed meter interferometer which is currently being constructed at the University of Glasgow. With this proof-of-principle experiment we aim to demonstrate the theoretically predicted lower quantum noise in a Sagnac interferometer compared to an equivalent Michelson interferometer, to qualify Sagnac speed meters for further research towards an implementation in a future generation large scale gravitational wave detector, such as the planned Einstein Telescope observatory.

C. Gräf; B. W. Barr; A. S. Bell; F. Campbell; A. V. Cumming; S. L. Danilishin; N. A. Gordon; G. D. Hammond; J. Hennig; E. A. Houston; S. H. Huttner; R. A. Jones; S. S. Leavey; H. Lück; J. Macarthur; M. Marwick; S. Rigby; R. Schilling; B. Sorazu; A. Spencer; S. Steinlechner; K. A. Strain; S. Hild

2014-09-11T23:59:59.000Z

302

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network [OSTI]

Study: The Economic Cost of Net-Metering in Maryland: WhoEnergy (DSIRE), 2010. Map of Net Metering Policies [WWWdocuments/summarymaps/Net_Metering_map.ppt De Jonghe, C. ,

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

303

Deployment Effects of Marin Renewable Energy Technologies  

SciTech Connect (OSTI)

Given proper care in siting, design, deployment, operation and maintenance, marine and hydrokinetic technologies could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood, due to a lack of technical certainty. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based approach to the emerging wave and tidal technology sectors in order to evaluate the impact of these technologies on the marine environment and potentially conflicting uses. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios will capture variations in technical approaches and deployment scales to properly identify and characterize environmental impacts and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential effects of these emerging technologies and focus all stakeholders onto the critical issues that need to be addressed. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory and navigational issues. The results of this study are structured into three reports: 1. Wave power scenario description 2. Tidal power scenario description 3. Framework for Identifying Key Environmental Concerns This is the second report in the sequence and describes the results of conceptual feasibility studies of tidal power plants deployed in Tacoma Narrows, Washington. The Narrows contain many of the same competing stakeholder interactions identified at other tidal power sites and serves as a representative case study. Tidal power remains at an early stage of development. As such, a wide range of different technologies are being pursued by different manufacturers. In order to properly characterize impacts, it is useful to characterize the range of technologies that could be deployed at the site of interest. An industry survey informs the process of selecting representative tidal power devices. The selection criteria is that such devices are at an advanced stage of development to reduce technical uncertainties and that enough data are available from the manufacturers to inform the conceptual design process of this study. Further, an attempt is made to cover the range of different technologies under development to capture variations in potential environmental effects. A number of other developers are also at an advanced stage of development including Verdant Power, which has demonstrated an array of turbines in the East River of New York, Clean Current, which has demonstrated a device off Race Rocks, BC, and OpenHydro, which has demonstrated a device at the European Marine Energy Test Center and is on the verge of deploying a larger device in the Bay of Fundy. MCT demonstrated their device both at Devon (UK) and Strangford Narrows (Northern Ireland). Furthermore OpenHydro, CleanCurrent, and MCT are the three devices being installed at the Minas Passage (Canada). Environmental effects will largely scale with the size of tidal power development. In many cases, the effects of a single device may not be measurable, while larger scale device arrays may have cumulative impacts that differ significantly from smaller scale deployments. In order to characterize these effects, scenarios are established at three deployment scales which nom

Brian Polagye; Mirko Previsic

2010-06-17T23:59:59.000Z

304

Metals Production Requirements for Rapid Photovoltaics Deployment  

E-Print Network [OSTI]

If global photovoltaics (PV) deployment grows rapidly, the required input materials need to be supplied at an increasing rate. In this paper, we quantify the effect of PV deployment levels on the scale of metals production. For example, we find that if cadmium telluride {copper indium gallium diselenide} PV accounts for more than 3% {10%} of electricity generation by 2030, the required growth rates for the production of indium and tellurium would exceed historically-observed production growth rates for a large set of metals. In contrast, even if crystalline silicon PV supplies all electricity in 2030, the required silicon production growth rate would fall within the historical range. More generally, this paper highlights possible constraints to the rate of scaling up metals production for some PV technologies, and outlines an approach to assessing projected metals growth requirements against an ensemble of past growth rates from across the metals production sector. The framework developed in this paper may be...

Kavlak, Goksin; Jaffe, Robert L; Trancik, Jessika E

2015-01-01T23:59:59.000Z

305

Shallow (2-meter) temperature surveys in Colorado  

SciTech Connect (OSTI)

Citation Information: Originator: Geothermal Development Associates, Reno, Nevada Publication Date: 2012 Title: Colorado 2m Survey Edition: First Publication Information: Publication Place: Reno Nevada Publisher: Geothermal Development Associates, Reno, Nevada Description: Shallow temperature surveys are useful in early-stage geothermal exploration to delineate surface outflow zones, with the intent to identify the source of upwelling, usually a fault. Detailed descriptions of the 2-meter survey method and equipment design can be found in Coolbaugh et al. (2007) and Sladek et al. (2007), and are summarized here. The survey method was devised to measure temperature as far below the zone of solar influence as possible, have minimal equilibration time, and yet be portable enough to fit on the back of an all-terrain vehicle (ATV); Figure 2). This method utilizes a direct push technology (DPT) technique where 2.3 m long, 0.54” outer diameter hollow steel rods are pounded into the ground using a demolition hammer. Resistance temperature devices (RTD) are then inserted into the rods at 2-meter depths, and allowed to equilibrate for one hour. The temperatures are then measured and recorded, the rods pulled out of the ground, and re-used at future sites. Usually multiple rods are planted over the course of an hour, and then the sampler returns back to the first station, measures the temperatures, pulls the rods, and so on, to eliminate waiting time. At Wagon Wheel Gap, 32 rods were planted around the hot springs between June 20 and July 1, 2012. The purpose was to determine the direction of a possible upflow fault or other structure. Temperatures at 1.5m and 2m depths were measured and recorded in the attribute table of this point shapefile. Several anomalous temperatures suggest that outflow is coming from a ~N60W striking fault or shear zone that contains the quartz-fluorite-barite veins of the adjacent patented mining claims. It should be noted that temperatures at 2m depth vary according to the amount of solar heating from above, as well as possible geothermal heating from below. Spatial Domain: Extent: Top: 4490310.560635 m Left: 150307.008238 m Right: 433163.213617 m Bottom: 4009565.915398 m Contact Information: Contact Organization: Geothermal Development Associates, Reno, Nevada Contact Person: Richard “Rick” Zehner Address: 3740 Barron Way City: Reno State: NV Postal Code: 89511 Country: USA Contact Telephone: 775-737-7806 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System 1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

Zehner, Richard E.

2012-02-01T23:59:59.000Z

306

Property:DeploymentPrograms | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories onFocusOskiPhilipspresents newValues JumpDeploymentPrograms Jump

307

Remotely deployable aerial inspection using tactile sensors  

SciTech Connect (OSTI)

For structural monitoring applications, the use of remotely deployable Non-Destructive Evaluation (NDE) inspection platforms offer many advantages, including improved accessibility, greater safety and reduced cost, when compared to traditional manual inspection techniques. The use of such platforms, previously reported by researchers at the University Strathclyde facilitates the potential for rapid scanning of large areas and volumes in hazardous locations. A common problem for both manual and remote deployment approaches lies in the intrinsic stand-off and surface coupling issues of typical NDE probes. The associated complications of these requirements are obviously significantly exacerbated when considering aerial based remote inspection and deployment, resulting in simple visual techniques being the preferred sensor payload. Researchers at Bristol Robotics Laboratory have developed biomimetic tactile sensors modelled on the facial whiskers (vibrissae) of animals such as rats and mice, with the latest sensors actively sweeping their tips across the surface in a back and forth motion. The current work reports on the design and performance of an aerial inspection platform and the suitability of tactile whisking sensors to aerial based surface monitoring applications.

MacLeod, C. N.; Cao, J.; Pierce, S. G.; Dobie, G.; Summan, R. [Centre for Ultrasonic Engineering, University of Strathclyde, Glasgow, G1 1XW (United Kingdom); Sullivan, J. C.; Pipe, A. G. [Bristol Robotics Laboratory, University of the West of England, Bristol, BS16 1QY (United Kingdom)

2014-02-18T23:59:59.000Z

308

Regional Effort to Deploy Clean Coal Technologies  

SciTech Connect (OSTI)

The Southern States Energy Board's (SSEB) 'Regional Effort to Deploy Clean Coal Technologies' program began on June 1, 2003, and was completed on January 31, 2009. The project proved beneficial in providing state decision-makers with information that assisted them in removing barriers or implementing incentives to deploy clean coal technologies. This was accomplished through two specific tasks: (1) domestic energy security and diversity; and (2) the energy-water interface. Milestones accomplished during the project period are: (1) Presentations to Annual Meetings of SSEB Members, Associate Member Meetings, and the Gasification Technologies Council. (2) Energy: Water reports - (A) Regional Efforts to Deploy Clean Coal Technologies: Impacts and Implications for Water Supply and Quality. June 2004. (B) Energy-Water Interface Challenges: Coal Bed Methane and Mine Pool Water Characterization in the Southern States Region. 2004. (C) Freshwater Availability and Constraints on Thermoelectric Power Generation in the Southeast U.S. June 2008. (3) Blackwater Interactive Tabletop Exercise - Decatur, Georgia April 2007. (4) Blackwater Report: Blackwater: Energy and Water Interdependency Issues: Best Practices and Lessons Learned. August 2007. (5) Blackwater Report: BLACKWATER: Energy Water Interdependency Issues REPORT SUMMARY. April 2008.

Gerald Hill; Kenneth Nemeth; Gary Garrett; Kimberly Sams

2009-01-31T23:59:59.000Z

309

Designing and Operating Through Compromise: Architectural Analysis of CKMS for the Advanced Metering Infrastructure  

SciTech Connect (OSTI)

Compromises attributable to the Advanced Persistent Threat (APT) highlight the necessity for constant vigilance. The APT provides a new perspective on security metrics (e.g., statistics based cyber security) and quantitative risk assessments. We consider design principals and models/tools that provide high assurance for energy delivery systems (EDS) operations regardless of the state of compromise. Cryptographic keys must be securely exchanged, then held and protected on either end of a communications link. This is challenging for a utility with numerous substations that must secure the intelligent electronic devices (IEDs) that may comprise complex control system of systems. For example, distribution and management of keys among the millions of intelligent meters within the Advanced Metering Infrastructure (AMI) is being implemented as part of the National Smart Grid initiative. Without a means for a secure cryptographic key management system (CKMS) no cryptographic solution can be widely deployed to protect the EDS infrastructure from cyber-attack. We consider 1) how security modeling is applied to key management and cyber security concerns on a continuous basis from design through operation, 2) how trusted models and key management architectures greatly impact failure scenarios, and 3) how hardware-enabled trust is a critical element to detecting, surviving, and recovering from attack.

Duren, Mike [Sypris Electronics, LLC] [Sypris Electronics, LLC; Aldridge, Hal [ORNL] [ORNL; Abercrombie, Robert K [ORNL] [ORNL; Sheldon, Frederick T [ORNL] [ORNL

2013-01-01T23:59:59.000Z

310

Nationwide: Slashing Red Tape To Speed Solar Deployment for Homes...  

Energy Savers [EERE]

Slashing Red Tape To Speed Solar Deployment for Homes and Businesses Nationwide: Slashing Red Tape To Speed Solar Deployment for Homes and Businesses January 24, 2014 - 12:00am...

311

Notice of Intent: Deploying Solutions to Improve the Energy Efficiency...  

Broader source: Energy.gov (indexed) [DOE]

Deploying Solutions to Improve the Energy Efficiency of U.S. Commercial Buildings (FOA-0001168) Notice of Intent: Deploying Solutions to Improve the Energy Efficiency of U.S....

312

DOE Fuel Cell Technologies Office Record 14009: Industry Deployed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

09: Industry Deployed Fuel Cell Backup Power (BuP) DOE Fuel Cell Technologies Office Record 14009: Industry Deployed Fuel Cell Backup Power (BuP) This program record from the U.S....

313

DOE Fuel Cell Technologies Office Record 14010: Industry Deployed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

0: Industry Deployed Fuel Cell Powered Lift Trucks DOE Fuel Cell Technologies Office Record 14010: Industry Deployed Fuel Cell Powered Lift Trucks This program record from the U.S....

314

Dynamic instabilities imparted by CubeSat deployable solar panels  

E-Print Network [OSTI]

In this work, multibody dynamics simulation was used to investigate the effects of solar panel deployment on CubeSat attitude dynamics. Nominal and partial/asymmetric deployments were simulated for four different solar ...

Peters, Eric David

2014-01-01T23:59:59.000Z

315

Report: U.S. Military Accelerates Deployment of Clean Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Report: U.S. Military Accelerates Deployment of Clean Energy Technologies Report: U.S. Military Accelerates Deployment of Clean Energy Technologies January 22, 2014 - 12:00am...

316

Sustainability of Large Deployment of Photovoltaics: Environmental & Grid Integration Research  

E-Print Network [OSTI]

1 Sustainability of Large Deployment of Photovoltaics: Environmental & Grid Integration Research Sustainability of Large Deployment of Photovoltaics: Environmental & Grid Integration Research www Photovoltaics Environmental Research Center Brookhaven National Laboratory #12;2 Source: PV Market Outlook

Ohta, Shigemi

317

Growth in metals production for rapid photovoltaics deployment  

E-Print Network [OSTI]

If global photovoltaics (PV) deployment grows rapidly, the required input materials need to be supplied at an increasing rate. We quantify the effect of PV deployment levels on the scale of annual metals production. If a ...

Kavlak, Goksin

318

DOE Hydrogen and Fuel Cells Program Record #13007: Industry Deployed...  

Broader source: Energy.gov (indexed) [DOE]

13007: Industry Deployed Fuel Cell Backup Power (BuP) DOE Hydrogen and Fuel Cells Program Record 13007: Industry Deployed Fuel Cell Backup Power (BuP) This record from the DOE...

319

A feasibility study for a manufacturing technology deployment center  

SciTech Connect (OSTI)

The Automation & Robotics Research Institute (ARRI) and the Texas Engineering Extension Service (TEEX) were funded by the U.S. Department of Energy to determine the feasibility of a regional industrial technology institute to be located at the Superconducting Super Collider (SSC) Central Facility in Waxahachie, Texas. In response to this opportunity, ARRI and TEEX teamed with the DOE Kansas City Plant (managed by Allied Signal, Inc.), Los Alamos National Laboratory (managed by the University of California), Vought Aircraft Company, National Center for Manufacturing Sciences (NCMS), SSC Laboratory, KPMG Peat Marwick, Dallas County Community College, Navarro Community College, Texas Department of Commerce (TDOC), Texas Manufacturing Assistance Center (TMAC), Oklahoma Center for the Advancement of Science and Technology, Arkansas Science and Technology Authority, Louisiana Productivity Center, and the NASA Mid-Continent Technology Transfer Center (MCTTC) to develop a series of options, perform the feasibility analysis and secure industrial reviews of the selected concepts. The final report for this study is presented in three sections: Executive Summary, Business Plan, and Technical Plan. The results from the analysis of the proposed concept support the recommendation of creating a regional technology alliance formed by the states of Texas, New Mexico, Oklahoma, Arkansas and Louisiana through the conversion of the SSC Central facility into a Manufacturing Technology Deployment Center (MTDC).

Not Available

1994-10-31T23:59:59.000Z

320

Recent developments in orifice meter and flow conditioner research  

SciTech Connect (OSTI)

In 1969 concerns were raised regarding the validity of the orifice meter`s coefficient of discharge uncertainty. An effort to resolve these concerns resulted in an internationally supported research project which produced a new sharp-edged concentric orifice meter empirical database and coefficient of discharge equation. However, the new empirical database and coefficient of discharge equation did not account for all of the differences being encountered in orifice metering. And in 1986, as a derivative of the coefficient of discharge equation research, questions were raised regarding the influences of installation effects on the orifice meter`s coefficient of discharge. The 1986 EC research data indicated that the flow conditioner and straight pipe installation requirements of the flow measurement standards were inadequate to prevent biasing of the orifice meter`s coefficient of discharge by flow disturbances generated from upstream piping elements. Data generated from 1990 through 1993 by GRI sponsored SWRI and NIST research confirmed the original EC biasing and further identified differential pressure tap radial position sensitivity and velocity profile and swirl angle theory deficiencies. Current research is continuing to define installation effects influences and identify possible solutions.

LaNasa, P.J. [CPL and Associates, Houston, TX (United States)

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

CSEM WP 105 Dynamic Pricing, Advanced Metering and  

E-Print Network [OSTI]

CSEM WP 105 Dynamic Pricing, Advanced Metering and Demand Response in Electricity Markets Severin Pricing, Advanced Metering, and Demand Response in Electricity Markets Severin Borenstein Michael Jaske energy crisis and potential solutions for the future. This work was sponsored by the William and Flora

California at Berkeley. University of

322

Securing Energy Metering Software with Automatic Source Code Correction  

E-Print Network [OSTI]

of energy production have been fostering the monitoring and analy- sis of electricity consumption be used for instance to store and access real-time and/or historical consumption data, plot this data and electronic electricity meters. Smart meters have processing and communication abilities, which enable novel

Neves, Nuno

323

Readily Available Data Help to Overcome Geothermal Deployment...  

Broader source: Energy.gov (indexed) [DOE]

Articles Energy Department Announces National Geothermal Data System to Accelerate Geothermal Energy Development The National Geothermal Data System deploys free,...

324

Renewables and CHP Deployment in the UK January 2002  

E-Print Network [OSTI]

Renewables and CHP Deployment in the UK to 2020 Jim Watson January 2002 Tyndall Centre for Climate Change Research Working Paper 21 #12;Renewables and CHP Deployment in the UK to 2020 Jim Watson Energy....................................................................................................6 3. The Deployment of Renewables and CHP to 2020

Watson, Andrew

325

Pretreatment Technology Plan  

SciTech Connect (OSTI)

This technology plan presents a strategy for the identification, evaluation, and development of technologies for the pretreatment of radioactive wastes stored in underground storage tanks at the Hanford Site. This strategy includes deployment of facilities and process development schedules to support the other program elements. This document also presents schedule information for alternative pretreatment systems: (1) the reference pretreatment technology development system, (2) an enhanced pretreatment technology development system, and (3) alternative pretreatment technology development systems.

Barker, S.A. [Westinghouse Hanford Co., Richland, WA (US); Thornhill, C.K.; Holton, L.K. Jr. [Pacific Northwest Lab., Richland, WA (US)

1993-03-01T23:59:59.000Z

326

Property:DeploymentSector | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformationInyoCoolingTowerWaterUseSummerConsumed Jump to:DOEInvolveDeploymentSector Jump to:

327

Technology Deployment Case Studies | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Energy Technical EvaluationTechnology Deployment »

328

Parity meter for charge qubits: an efficient quantum entangler  

E-Print Network [OSTI]

We propose a realization of a charge parity meter based on two double quantum dots alongside a quantum point contact. Such a device is a specific example of the general class of mesoscopic quadratic quantum measurement detectors previously investigated by Mao et al. [Phys. Rev. Lett. 93, 056803 (2004)]. Our setup accomplishes entangled state preparation by a current measurement alone, and allows the qubits to be effectively decoupled by pinching off the parity meter. Two applications of the parity meter are discussed: the measurement of Bell's inequality in charge qubits and the realization of a controlled NOT gate.

B. Trauzettel; A. N. Jordan; C. W. J. Beenakker; M. Buttiker

2006-04-26T23:59:59.000Z

329

Chevron facility focused on commercial orifice-meter research  

SciTech Connect (OSTI)

Research to determine the accuracy of commercial orifice meters for custody-transfer measurement has indicated that high-volume gas meters can be flow-proven while in such service. The research further yielded more accurate orifice-meter discharge coefficient equations (at Reynolds numbers greater than 4,000,000) than current equations of the International Standards Organization (ISO) and the American Petroleum Institute (API). These are partial findings of a major study conducted by Chevron Oil Field Research Co. at its Venice, La., calibration facility.

Jones, E.H.; Ferguson, K.R.

1987-07-27T23:59:59.000Z

330

Integrated assessment of dispersed energy resources deployment  

SciTech Connect (OSTI)

The goal of this work is to create an integrated framework for forecasting the adoption of distributed energy resources (DER), both by electricity customers and by the various institutions within the industry itself, and for evaluating the effect of this adoption on the power system, particularly on the overall reliability and quality of electrical service to the end user. This effort and follow on contributions are intended to anticipate and explore possible patterns of DER deployment, thereby guiding technical work on microgrids towards the key technical problems. An early example of this process addressed is the question of possible DER adopting customer disconnection. A deployment scenario in which many customers disconnect from their distribution company (disco) entirely leads to a quite different set of technical problems than a scenario in which customers self generate a significant share or all of their on-site electricity requirements and additionally buy and sell energy and ancillary services (AS) locally and/or into wider markets. The exploratory work in this study suggests that the economics under which customers disconnect entirely are unlikely.

Marnay, Chris; Blanco, Raquel; Hamachi, Kristina S.; Kawaan, Cornelia P.; Osborn, Julie G.; Rubio, F. Javier

2000-06-01T23:59:59.000Z

331

Regional Energy Deployment System (ReEDS)  

SciTech Connect (OSTI)

The Regional Energy Deployment System (ReEDS) is a deterministic optimization model of the deployment of electric power generation technologies and transmission infrastructure throughout the contiguous United States into the future. The model, developed by the National Renewable Energy Laboratory's Strategic Energy Analysis Center, is designed to analyze the critical energy issues in the electric sector, especially with respect to potential energy policies, such as clean energy and renewable energy standards or carbon restrictions. ReEDS provides a detailed treatment of electricity-generating and electrical storage technologies and specifically addresses a variety of issues related to renewable energy technologies, including accessibility and cost of transmission, regional quality of renewable resources, seasonal and diurnal generation profiles, variability of wind and solar power, and the influence of variability on the reliability of the electrical grid. ReEDS addresses these issues through a highly discretized regional structure, explicit statistical treatment of the variability in wind and solar output over time, and consideration of ancillary services' requirements and costs.

Short, W.; Sullivan, P.; Mai, T.; Mowers, M.; Uriarte, C.; Blair, N.; Heimiller, D.; Martinez, A.

2011-12-01T23:59:59.000Z

332

25 years ago: the official farewell to the meter  

E-Print Network [OSTI]

On october 21st 1983 took place in S\\`evres on the western outskirts of Paris the official funeral of the meter. With it the notion of distance as a physical observable was buried.

Thomas Schucker

2008-10-20T23:59:59.000Z

333

Smart Meters Helping Oklahoma Consumers Save Hundreds During...  

Broader source: Energy.gov (indexed) [DOE]

meters give consumers real-time information on how their energy use affects their energy costs. With a two-tiered pricing system, you get a discount during lower usage...

334

Development Of 2-Meter Soil Temperature Probes And Results Of...  

Open Energy Info (EERE)

Meter Soil Temperature Probes And Results Of Temperature Survey Conducted At Desert Peak, Nevada, Usa Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference...

335

Down to the Meter: Localized Vehicle Pollution Matters  

E-Print Network [OSTI]

Near-Roadway Vehicle Pollution,” American Journal of Publicfor Vehicle-Related Air Pollution Exposure in Minority andMeter: Localized Vehicle Pollution Matters B Y D O U G L A S

Houston, Douglas; Wu, Jun; Ong, Paul; Winer, Arthur

2006-01-01T23:59:59.000Z

336

Smart Meters Offer 'Instant Gratification;' Help Houston Homeowners...  

Broader source: Energy.gov (indexed) [DOE]

Diorio explains to KPRC Local 2 News how much she's saved with her recently installed smart meter, which allows her to see her savings in real time. Houston resident Ruth...

337

Demand Response and Smart Metering Policy Actions Since the Energy...  

Broader source: Energy.gov (indexed) [DOE]

This report represents a review of policy developments on demand response and other related areas such as smart meters and smart grid. It has been prepared by the Demand Response...

338

LM to Meet Energy Metering Goals Through Enhanced Data Collection...  

Broader source: Energy.gov (indexed) [DOE]

goals related to energy usage and metering. The first goal states that LM should reduce energy use intensity (EUI) by 30 percent by fiscal year (FY) 2020, as compared to the FY...

339

NREL: Energy Storage - BLAST for Behind-the-Meter Applications...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lite (BLAST-BTM Lite) provides a quick, user-friendly tool to size behind-the-meter energy storage devices used on site by utility customers for facility demand charge...

340

Value creation and value capture of advanced electricity meter information  

E-Print Network [OSTI]

Advanced or smart metering has been a hot topic in the electricity community for several years. Despite the excitement about the technology, few business cases are actually able to justify the investment cost. One reason ...

Oesterlin, Ulf

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Helping New Hampshire Achieve Its 25 x 25 Goal Renewable Energy Incentives, Energy Metering, and  

E-Print Network [OSTI]

........................................................................ 21 5. ENERGY CONSERVATION: SMART METERING.........Helping New Hampshire Achieve Its 25 x 25 Goal Renewable Energy Incentives, Energy Metering............................................................ 12 3. RENEWABLE ENERGY: PRODUCTION INCENTIVES................................... 14 3.1 NET METERING

Lotko, William

342

Insights from Smart Meters: The Potential for Peak-Hour Savings from Behavior-Based Programs  

E-Print Network [OSTI]

2014.  Insights from Smart  Meters: The Potential for Peak available data captured by smart meters and other sources,series Insights from Smart Meters. DRAFT – DO NOT CIRCULATE

Todd, Annika

2014-01-01T23:59:59.000Z

343

Metering and Calibration in LoanSTAR Buildings  

E-Print Network [OSTI]

or many stories away from each other. Power measurements across multiple panels can increase costs dramatically. Buildings often have multiple electrical feeds or feed additional buildings. Asbestos is found in many chilled and hot water piping... installed before 1970. Installation of thermal metering requires asbestos abatement. The cost to remove the asbestos may be too high to justify the thermal metering. (6) Timely installation of equipment requires an intensive coordination effort during...

O'Neal, D. L.; Bryant, J. A.; Turner, W. D.; Glass, M. G.

1990-01-01T23:59:59.000Z

344

Building Diagnostic Market Deployment - Final Report  

SciTech Connect (OSTI)

The work described in this report was done as part of a Cooperative Research and Development Agreement (CRADA) between the U.S. Department of Energy’s Pacific Northwest National Laboratory (PNNL) and KGS Building LLC (KGS). PNNL and KGS both believe that the widespread adoption of automated fault de4tection and diagnostic (AFDD) tools will result in significant reduction to energy and peak energy consumption. The report provides an introduction, and summary of the various tasks performed under the CRADA. The CRADA project had three major focus areas: 1) Technical Assistance for Whole Building Energy Diagnostician (WBE) Commercialization, 2) Market Transfer of the Outdoor Air/Economizer Diagnostician (OAE), and 3) Development and Deployment of Automated Diagnostics to Improve Large Commercial Building Operations.

Katipamula, Srinivas; Gayeski, N.

2012-04-01T23:59:59.000Z

345

E-Print Network 3.0 - automated seepage meters Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

there exists less information on the mechanism An automated dye-dilution based seepage meter... , Woods Hole, Massachusetts 02543 Abstract We designed an automated seepage meter...

346

E-Print Network 3.0 - activity meters Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing in the Advanced Metering Infrastructure Summary: . The activities of a smart meter are coordinated by its Microcontroller Unit (MCU). The majority of work...

347

Design and development of digital smart meter network for distribution system.  

E-Print Network [OSTI]

??"The main objective of this study is to design and develop smart meter network to investigate the requirements of an efficient and reliable smart meter… (more)

Rahman, Md. M

2011-01-01T23:59:59.000Z

348

Smart-Metering for Monitoring Building Power Distribution Network using Instantaneous Phasor Computations of Electrical Signals  

E-Print Network [OSTI]

Smart-Metering for Monitoring Building Power Distributionimplementable for smart-meters for a building. Eachcontrol node of a building so as to make smart decisions.

K.R., Krishnanand

2013-01-01T23:59:59.000Z

349

Development and Deployment of the Mobile Arm Retrieval System (MARS) - 12187  

SciTech Connect (OSTI)

Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012. (authors)

Burke, Christopher A.; Landon, Matthew R. [Washington River Protection Solutions, Richland, Washington 99352 (United States); Hanson, Carl E. [AREVA Federal Services, Richland, Washington 99352 (United States)

2012-07-01T23:59:59.000Z

350

DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187  

SciTech Connect (OSTI)

Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are beinglhave been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

BURKE CA; LANDON MR; HANSON CE

2011-11-08T23:59:59.000Z

351

DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187  

SciTech Connect (OSTI)

Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

BURKE CA; LANDON MR; HANSON CE

2012-01-30T23:59:59.000Z

352

Economic Impact of Fuel Cell Deployment in Forklifts and for...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ANL-1309 Economic Impact of Fuel Cell Deployment in Forklifts and for Backup Power under the American Recovery and Reinvestment Act Energy Systems Division About Argonne National...

353

Polynomial continuation in the design of deployable structures  

E-Print Network [OSTI]

(De Focatiis & Guest, 2002). Some of the most interesting applications are to be found in satellite design, in which deployable booms, masts, antennae, radars and solar arrays are commonplace. These deployable structures are launched in the stowed... -Gru??bler-Kutzbach criterion. An example of the deployment of such an overconstrained mechanism is given in Figure 1.7. De- ployable frames have been proposed for use in space applications (Chen & You, 2006a,b) (in particular panel and antenna deployment (Pellegrino et al...

Viquerat, Andrew David

2012-01-10T23:59:59.000Z

354

Electric Vehicle Deployment: Policy Questions and Impacts to...  

Energy Savers [EERE]

regarding policy questions and impacts to the electric grid from the energy demands of electric vehicles. EAC - Electric Vehicle Deployment - Impacts to the US Electric Grid -...

355

Evaluation of Stationary Fuel Cell Deployments, Costs, and Fuels (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes NREL's technology validation of stationary fuel cell systems and presents data on number of deployments, system costs, and fuel types.

Ainscough, C.; Kurtz, J.; Peters, M.; Saur, G.

2013-10-01T23:59:59.000Z

356

Navigating Roadblocks on the Path to Advanced Biofuels Deployment  

Broader source: Energy.gov [DOE]

Breakout Session 2: Frontiers and Horizons Session 2–C: Navigating Roadblocks on the Path to Advanced Biofuels Deployment Andrew Held, Senior Director of Feedstock Development, Virent, Inc.

357

Abstract: Development and Deployment of a Short Rotation Woody...  

Energy Savers [EERE]

Development and Deployment of a Short Rotation Woody Crops Harvesting System Based on a Case New Holland Forage Harvester and SRC Woody Crop Header Abstract: Development and...

358

Development and Deployment of a Short Rotation Woody Crops Harvesting...  

Office of Scientific and Technical Information (OSTI)

SRC Woody Crop Header Re-direct Destination: Demand for bioenergy sourced from woody biomass is projected to increase; however, the expansion and rapid deployment of short...

359

Evaluation of Imagers in a Biological Sensing Deployment  

E-Print Network [OSTI]

Therefore, we have utilized solar panels to power the entiremonitoring sensors, and solar panel. Main componentssensors - Battery - Solar panel Node Deployment Wireless/

2007-01-01T23:59:59.000Z

360

An Analytical Framework for Long Term Policy for Commercial Deployment...  

Open Energy Info (EERE)

Term Policy for Commercial Deployment and Innovation in Carbon Capture and Sequestration Technology in the United States Jump to: navigation, search Tool Summary LAUNCH TOOL Name:...

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DOE Supports Renewable Energy Deployment Projects for Forest...  

Broader source: Energy.gov (indexed) [DOE]

(FCPC) has significantly reduced greenhouse gas emissions through the deployment of a biogas generation facility and solar photovoltaic system. In 2011, the Community completed...

362

Compensated count-rate circuit for radiation survey meter  

DOE Patents [OSTI]

A count-rate compensating circuit is provided which may be used in a portable Geiger-Mueller (G-M) survey meter to ideally compensate for counting loss errors in the G-M tube detector. In a G-M survey meter, wherein the pulse rate from the G-M tube is converted into a pulse rate current applied to a current meter calibrated to indicate dose rate, the compensated circuit generates and controls a reference voltage in response to the rate of pulses from the detector. This reference voltage is gated to the current-generating circuit at a rate identical to the rate of pulses coming from the detector so that the current flowing through the meter is varied in accordance with both the frequency and amplitude of the reference voltage pulses applied thereto so that the count rate is compensated ideally to indicate a true count rate within 1% up to a 50% duty cycle for the detector. A positive feedback circuit is used to control the reference voltage so that the meter output tracks true count rate indicative of the radiation dose rate.

Todd, Richard A. (Powell, TN)

1981-01-01T23:59:59.000Z

363

Compensated count-rate circuit for radiation survey meter  

DOE Patents [OSTI]

A count-rate compensating circuit is provided which may be used in a portable Geiger-Mueller (G-M) survey meter to ideally compensate for couting loss errors in the G-M tube detector. In a G-M survey meter, wherein the pulse rate from the G-M tube is converted into a pulse rate current applied to a current meter calibrated to indicate dose rate, the compensation circuit generates and controls a reference voltage in response to the rate of pulses from the detector. This reference voltage is gated to the current-generating circuit at a rate identical to the rate of pulses coming from the detector so that the current flowing through the meter is varied in accordance with both the frequency and amplitude of the reference voltage pulses applied thereto so that the count rate is compensated ideally to indicate a true count rate within 1% up to a 50% duty cycle for the detector. A positive feedback circuit is used to control the reference voltage so that the meter output tracks true count rate indicative of the radiation dose rate.

Todd, R.A.

1980-05-12T23:59:59.000Z

364

Plug-in privacy for Smart Metering billing  

E-Print Network [OSTI]

Smart Metering is a concept that allows to collect fine-grained consumption profiles from customers by replacing traditional electricity meters with Smart Meters in customers' households. The recorded consumption profile is the basis for the calculation of time-dependent tariffs but also allows deduction of the inhabitant's personal schedules and habits. The current reporting of such consumption profiles only protects this data from 3rd parties but falls short to protect the customer's privacy from illegitimate abuse by the supplier itself. We propose a privacy-preserving profile reporting protocol that enables billing for time-dependent tariffs without disclosing the actual data of the consumption profile to the supplier. Our approach relies on a zero-knowledge proof based on Pedersen Commitments performed by a plug-in privacy component that is put into the communication link between Smart Meter and supplier's back-end systems and requires no change to Smart Meter hardware and only little change to the softw...

Jawurek, Marek; Kerschbaum, Florian

2010-01-01T23:59:59.000Z

365

Shape Recovery of Viscoelastic Deployable Structures and Sergio Pellegrino  

E-Print Network [OSTI]

and opposite sense folding. I. Introduction Deployable structures made of thin carbon fiber reinforced polymerShape Recovery of Viscoelastic Deployable Structures Kawai Kwok and Sergio Pellegrino California Institute of Technology, Pasadena, CA 91125 The paper investigates the shape recovery behavior of a simple

Pellegrino, Sergio

366

Net Metering and Interconnection Procedures-- Incorporating Best Practices  

SciTech Connect (OSTI)

State utility commissions and utilities themselves are actively developing and revising their procedures for the interconnection and net metering of distributed generation. However, the procedures most often used by regulators and utilities as models have not been updated in the past three years, in which time most of the distributed solar facilities in the United States have been installed. In that period, the Interstate Renewable Energy Council (IREC) has been a participant in more than thirty state utility commission rulemakings regarding interconnection and net metering of distributed generation. With the knowledge gained from this experience, IREC has updated its model procedures to incorporate current best practices. This paper presents the most significant changes made to IREC���¹��������s model interconnection and net metering procedures.

Jason Keyes, Kevin Fox, Joseph Wiedman, Staff at North Carolina Solar Center

2009-04-01T23:59:59.000Z

367

Advanced Metering Implementations - A Perspective from Federal Sector  

SciTech Connect (OSTI)

Federal mandate (EPACT 2005) requires that federal buildings install advanced electrical meters-meters capable of providing data at least daily and measuring the consumption of electricity at least hourly. This work presents selected advanced metering implementations to understand some of the existing practices related to data capture and to understand how the data is being translated into information and knowledge that can be used to improve building energy and operational performance to meet federal energy reduction mandates. This study highlights case studies to represent some of the various actions that are being taken based on the data that are being collected to improve overall energy performance of these buildings. Some of these actions include- individualized tenant billing and energy forecasting, benchmarking, identifying energy conservation measures, measurement and verification.

Eaarni, Shankar

2014-08-11T23:59:59.000Z

368

Microwave Pickup on the Crawford Hill 7-meter Jeff McMahon  

E-Print Network [OSTI]

Microwave Pickup on the Crawford Hill 7-meter Telescope Jeff McMahon Project Advisor: Suzanne-Meter Telescope The Crawford Hill 7-meter telescope located at Bell labs in Holmdel, New Jersey is being considered for use in the CapMAP project. This antenna is a 7-meter offset Cassegrain reflector antenna

369

EVALUATING EFFECTIVENESS OF RAMP Evidence from the twin cities ramp meter shut-off  

E-Print Network [OSTI]

Chapter 9 EVALUATING EFFECTIVENESS OF RAMP METERS Evidence from the twin cities ramp meter shut-625-6354 Abstract: Ramp meters in the Twin Cities have been turned off for eight weeks in Fall 2000 in an experiment representative freeways during the afternoon peak period. Several performance measures for ramp metering

Levinson, David M.

370

Active fault creep variations at Chihshang, Taiwan, revealed by creep meter monitoring, 19982001  

E-Print Network [OSTI]

Active fault creep variations at Chihshang, Taiwan, revealed by creep meter monitoring, 1998] The daily creep meter data recorded at Chihshang in 1998­2001 are presented. The Chihshang creep meter similar annual shortening rates: 16.2 mm at the Tapo site (comprising two connected creep meters) and 15

Lee, Jian-Cheng

371

Differentially Private Smart Metering with Battery Michael Backes1,2  

E-Print Network [OSTI]

Differentially Private Smart Metering with Battery Recharging Michael Backes1,2 and Sebastian meters to take fine-grained readings of energy usage. These smart meters enable flexible time- of to a min- imum. 1 Introduction The energy industry has recently begun using smart meters to take fine

372

P\\procedure\\EU#7 Page 1 of 2 TITLE: PROCEDURE FOR RECORDING AND TRANSMITTING METER READINGS  

E-Print Network [OSTI]

P\\procedure\\EU#7 Page 1 of 2 TITLE: PROCEDURE FOR RECORDING AND TRANSMITTING METER READINGS FOR NEW METER SETS, METER REPLACEMENTS AND WHEN THE ACCOUNTABILITY FOR THE METERS USAGE CHANGES OBJECTIVE AND PURPOSE: To provide a timely and accurate method of capturing meter readings when a meter is changed out

Fernandez, Eduardo

373

Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers  

SciTech Connect (OSTI)

This report is a guidance document prepared for the benefit of commercial nuclear power plants’ (NPPs) supporting organizations and personnel who are considering or undertaking deployment of mobile technology for the purpose of improving human performance and plant status control (PSC) for field workers in an NPP setting. This document especially is directed at NPP business managers, Electric Power Research Institute, Institute of Nuclear Power Operations, and other non-Information Technology personnel. This information is not intended to replace basic project management practices or reiterate these processes, but is to support decision-making, planning, and preparation of a business case.

Heather D. Medema; Ronald K. Farris

2012-09-01T23:59:59.000Z

374

Entropy Meters and the Entropy of Non-extensive Systems  

E-Print Network [OSTI]

In our derivation of the second law of thermodynamics from the relation of adiabatic accessibility of equilibrium states we stressed the importance of being able to scale a system's size without changing its intrinsic properties. This leaves open the question of defining the entropy of macroscopic, but unscalable systems, such as gravitating bodies or systems where surface effects are important. We show here how the problem can be overcome, in principle, with the aid of an `entropy meter'. An entropy meter can also be used to determine entropy functions for non-equilibrium states and mesoscopic systems.

Elliott H. Lieb; Jakob Yngvason

2014-03-30T23:59:59.000Z

375

Testing the 2-element 4-wire delta watthour meter  

E-Print Network [OSTI]

G THE 2-ELE!KHT $&&ZRE DELTA VATTHSUR METER A Thesis Suboitted to the Faculty of' the Agricultural and Mechanical College of Texas in Part:"':ulfl1nent of j. ho Rsquiransnto for th- Degree of Master o Science Ma)or Sub]sets Electrical Enginosring... Bv Lynn Hovard Grasshof f Juno l'-J)Q LCKNOWLEDCd~T The author wishes to express his appreciation to llr. M. C. Fowler& ltxnager& Southwestern District, Bangamo Electric Company, i' or making available the neoessary test equipment, meters...

Grasshoff, Lynn Howard

1950-01-01T23:59:59.000Z

376

Connector-induced offsets in optical fiber power meters  

SciTech Connect (OSTI)

We discuss issues related to calibration of optical fiber power meters. The power readings may vary when using various types of fiber connectors, or even the same type of connectors made by different vendors. We study the connector effects by calibrating four types of optical fiber power meters using six different fiber connectors from four vendors at three wavelengths. We found variations of as much as 12% due to the different reflection properties of the detector windows, connectors, and detectors. We also compared connector measurement results with the data obtained by using open beams.

Vayshenker, Igor; Li Xiaoyu; Keenan, Darryl A

2006-08-20T23:59:59.000Z

377

Commercial Buildings Partnership Projects - Metered Data Format and Delivery  

SciTech Connect (OSTI)

A number of the Commercial Building Partnership Projects (CBPs) will require metering, monitoring, data analysis and verification of savings after the retrofits are complete. Although monitoring and verification (M&V) agents are free to use any metering and monitoring devices that they chose, the data they collect should be reported to Pacific Northwest National Laboratory (PNNL) in a standard format. PNNL will store the data collected in its CBP database for further use by PNNL and U.S. Department of Energy. This document describes the data storage process and the deliver format of the data from the M&V agents.

Katipamula, Srinivas

2010-11-16T23:59:59.000Z

378

Technology Deployment Annual Report 2013 December  

SciTech Connect (OSTI)

Idaho National Laboratory (INL) is a Department of Energy (DOE) multi-program national laboratory that conducts research and development in all DOE mission areas. Like all other federal laboratories, INL has a statutory technology transfer mission to make its capabilities and technologies available to all federal agencies, to state and local governments, and to universities and industry. To fulfill this mission, INL encourages its scientific, engineering, and technical staff to disclose new inventions and creations to ensure the resulting intellectual property is captured, protected, and made available to others who might benefit from it. As part of the mission, intellectual property is licensed to industrial partners for commercialization, creating jobs and delivering the benefits of federally funded technology to consumers. In other cases, unique capabilities are made available to other federal agencies or to regional small businesses to solve specific technical challenges. INL employees also work cooperatively with researchers and technical staff from the university and industrial sectors to further develop emerging technologies. In a multinational global economy, INL is contributing to the development of the next generation of engineers and scientists by licensing software to educational institutions throughout the world. This report is a catalog of selected INL technology transfer and commercialization transactions during this past year. The size and diversity of INL technical resources, coupled with the large number of relationships with other organizations, virtually ensures that a report of this nature will fail to capture all interactions. Recognizing this limitation, this report focuses on transactions that are specifically authorized by technology transfer legislation (and corresponding contractual provisions) or involve the transfer of legal rights to technology to other parties. This report was compiled from primary records, which were readily available to the INL’s Office of Technology Deployment. However, the accomplishments cataloged in the report reflect the achievements and creativity of the researchers, technicians, support staff, and operators of the INL workforce.

N /A

2014-01-01T23:59:59.000Z

379

Metering and the New Federal Requirements of Energy Policy Act 2005  

E-Print Network [OSTI]

agencies to meter electricity use in all federal buildings by Oct. 1, 2012 using advanced meters or metering devices that provide data at least daily. Six months after the enactment of EPAct, DOE’s Federal Energy Management Program, or FEMP... Station, Texas ABSTRACT Section 103 of the Energy Policy Act of 2005 (EPAct 2005) (1) mandates the installation of meters and advanced electric meters on all Federal Buildings by 2012 using guidelines developed by the US Department of Energy...

Ream, A.; Verdict, M.

2006-01-01T23:59:59.000Z

380

1. From the Mail Services website, (www.princeton.edu/mail) click on Metered Mail to access the Meter Request Form.  

E-Print Network [OSTI]

1. From the Mail Services website, (www.princeton.edu/mail) click on Metered Mail to access the Meter Request Form. 2. Log in using your Princeton NetID and password. The system will pre the drop-down menu. To enter a new chartstring, click "Create New." Online Meter Request Form A step

Singh, Jaswinder Pal

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Sandia Multispectral Airborne Lidar for UAV Deployment  

SciTech Connect (OSTI)

Sandia National Laboratories has initiated the development of an airborne system for W laser remote sensing measurements. System applications include the detection of effluents associated with the proliferation of weapons of mass destruction and the detection of biological weapon aerosols. This paper discusses the status of the conceptual design development and plans for both the airborne payload (pointing and tracking, laser transmitter, and telescope receiver) and the Altus unmanned aerospace vehicle platform. Hardware design constraints necessary to maintain system weight, power, and volume limitations of the flight platform are identified.

Daniels, J.W.; Hargis,Jr. P.J.; Henson, T.D.; Jordan, J.D.; Lang, A.R.; Schmitt, R.L.

1998-10-23T23:59:59.000Z

382

Note: A real-time beam current density meter  

SciTech Connect (OSTI)

We have developed a real-time beam current density meter for charged particle beams. It measures the mean current density by collimating a uniform and large diameter primary beam. The suppression of the secondary electrons and the deflection of the beam were simulated, and it was tested with a 105 keV Ar{sup 7+} ion beam.

Liu Junliang; Yu Deyang; Ruan Fangfang; Xue Yingli; Wang Wei [Institute of Modern Physics, Chinese Academy of Sciences, Lanzhou 730000 (China)

2013-03-15T23:59:59.000Z

383

Multi-vendor Penetration Testing in the Advanced Metering Infrastructure  

E-Print Network [OSTI]

Infrastructure (AMI) is changing the way electric energy is produced, priced, and consumed. The introduction,mcdaniel}@cse.psu.edu Abstract - The advanced metering infrastructure (AMI) is revolutionizing electrical grids. Intelligent AMI we develop an archetypal attack tree approach to guide penetration testing across multiple

McDaniel, Patrick Drew

384

The Statewide Benefits Of Net-Metering In California  

E-Print Network [OSTI]

on the costs and benefits of NEM to the Governor and Legislature. 4 Id. 5 California Solar Future: Growing to the total, "bundled" energy rate, which includes not only the cost of generation, but transmission of 2013 3 See Net Energy Metering Cost-Effectiveness Evaluation, Energy and Environmental Economics, Inc

Kammen, Daniel M.

385

Advanced accelerator simulation research: miniaturizing accelerators from kilometers to meters  

E-Print Network [OSTI]

Advanced accelerator simulation research: miniaturizing accelerators from kilometers to meters W: Advanced accelerator research is aimed at finding new technologies that can dramatically reduce the size and cost of future high-energy accelerators. Supercomputing is already playing a dramatic and critical role

Geddes, Cameron Guy Robinson

386

ParkingMeter: Balancing Energy Savings and Service Availability  

E-Print Network [OSTI]

ParkingMeter: Balancing Energy Savings and Service Availability Riccardo Crepaldi University of Illinois at Urbana Champaign rcrepal2@illinois.edu Ryan Welsh University of Illinois at Urbana Champaign rjwelsh2@illinois.edu Robin H. Kravets University of Illinois at Urbana Champaign rhk@illinois

Kravets, Robin

387

Personal energy metering Simon Hay, Andrew Rice and Andy Hopper  

E-Print Network [OSTI]

based on energy and usage data collected over the course of a year. We also studied the addi- tionalPersonal energy metering Simon Hay, Andrew Rice and Andy Hopper {sjeh3,acr31,ah12}@cam.ac.uk Computer Laboratory, University of Cambridge 1 Introduction Every day each of us consumes a significant

Cambridge, University of

388

VISITOR PARKING Pay station parking meters are available around  

E-Print Network [OSTI]

temporary parking needs. Daily scratch-off permits are available in advance from Parking Services. LOT METER PAY STATION RATES (SUMMER RATES MAY BE DISCOUNTED) HOW DO I GET A PERMIT? When parking on campus, a CSM parking permit is required Monday through Friday, from 7AM until 5 PM. Permits authorize parking

389

Privacy-friendly Energy-metering via Homomorphic Encryption  

E-Print Network [OSTI]

Privacy-friendly Energy-metering via Homomorphic Encryption Flavio D. Garcia and Bart Jacobs and consumption is one of the goals. Accurate usage data is important for such a better match. So-called smart by the utility sector. For instance, in April 2009 the Senate in the Netherlands has refused to pass a bill

Jacobs, Bart

390

Hydrostatic bearings for a turbine fluid flow metering device  

DOE Patents [OSTI]

A rotor assembly fluid metering device has been improved by development of a hydrostatic bearing fluid system which provides bearing fluid at a common pressure to rotor assembly bearing surfaces. The bearing fluid distribution system produces a uniform film of fluid between bearing surfaces and allows rapid replacement of bearing fluid between bearing surfaces, thereby minimizing bearing wear and corrosion. 3 figs.

Fincke, J.R.

1982-05-04T23:59:59.000Z

391

Advanced computational simulation of flow phenomena associated with orifice meters  

SciTech Connect (OSTI)

This paper presents and discusses results from a series of computational fluid dynamics (CFD) simulations of fluid flow phenomena associated with orifice meters. These simulations were performed using a new, state-of-the-art CFD code developed at Southwest Research Institute. This code is based on new techniques designed to take advantage of parallel computers to increase computational performance and fidelity of simulation results. This algorithm uses a domain decomposition strategy to create grid systems for very complex geometries composed of simpler geometric subregions, allowing for the accurate representation of the fluid flow domain. The domain decomposition technique maps naturally to parallel computer architectures. Here, the concept of message-passing is used to create a parallel algorithm, using the Parallel Virtual Machine (PVM) library. This code is then used to simulate the flow through an orifice meter run consisting of an orifice with a beta ratio of 0.5 and air flowing at a Reynolds number of 91,100. The work discussed in this paper is but the first step in developing a Virtual Metering Research Facility to support research, analysis, and formulation of new standards for metering.

Freitas, C.J. [Southwest Research Inst., San Antonio, TX (United States)

1995-12-31T23:59:59.000Z

392

Hydrostatic bearings for a turbine fluid flow metering device  

DOE Patents [OSTI]

A rotor assembly fluid metering device has been improved by development of a hydrostatic bearing fluid system which provides bearing fluid at a common pressure to rotor assembly bearing surfaces. The bearing fluid distribution system produces a uniform film of fluid between bearing surfaces and allows rapid replacement of bearing fluid between bearing surfaces, thereby minimizing bearing wear and corrosion.

Fincke, James R. (Rigby, ID)

1982-01-01T23:59:59.000Z

393

Characterization of oil and gas reservoirs and recovery technology deployment on Texas State Lands  

SciTech Connect (OSTI)

Texas State Lands oil and gas resources are estimated at 1.6 BSTB of remaining mobile oil, 2.1 BSTB, or residual oil, and nearly 10 Tcf of remaining gas. An integrated, detailed geologic and engineering characterization of Texas State Lands has created quantitative descriptions of the oil and gas reservoirs, resulting in delineation of untapped, bypassed compartments and zones of remaining oil and gas. On Texas State Lands, the knowledge gained from such interpretative, quantitative reservoir descriptions has been the basis for designing optimized recovery strategies, including well deepening, recompletions, workovers, targeted infill drilling, injection profile modification, and waterflood optimization. The State of Texas Advanced Resource Recovery program is currently evaluating oil and gas fields along the Gulf Coast (South Copano Bay and Umbrella Point fields) and in the Permian Basin (Keystone East, Ozona, Geraldine Ford and Ford West fields). The program is grounded in advanced reservoir characterization techniques that define the residence of unrecovered oil and gas remaining in select State Land reservoirs. Integral to the program is collaboration with operators in order to deploy advanced reservoir exploitation and management plans. These plans are made on the basis of a thorough understanding of internal reservoir architecture and its controls on remaining oil and gas distribution. Continued accurate, detailed Texas State Lands reservoir description and characterization will ensure deployment of the most current and economically viable recovery technologies and strategies available.

Tyler, R.; Major, R.P.; Holtz, M.H. [Univ. of Texas, Austin, TX (United States)] [and others

1997-08-01T23:59:59.000Z

394

Deployment algorithms for multi-agent exploration and patrolling  

E-Print Network [OSTI]

Exploration and patrolling are central themes in distributed robotics. These deployment scenarios have deep fundamental importance in robotics, beyond the most obvious direct applications, as they can be used to model a ...

Volkov, Mikhail, S.M. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

395

Navigating Roadblocks on the Path to Advanced Biofuels Deployment  

Broader source: Energy.gov [DOE]

Breakout Session 2: Frontiers and Horizons Session 2–C: Navigating Roadblocks on the Path to Advanced Biofuels Deployment Arunas Chesonis, Chief Executive Officer and Chairman of the Board, Sweetwater Energy

396

Analysis of Open Automated Demand Response Deployments in California  

E-Print Network [OSTI]

LBNL-6560E Analysis of Open Automated Demand Response Deployments in California and Guidelines The work described in this report was coordinated by the Demand Response Research. #12; #12;Abstract This report reviews the Open Automated Demand Response

397

Regulatory Instruments for Deployment of Clean Energy Technologies  

E-Print Network [OSTI]

Answering to the formidable challenge of climate change calls for a quick transition to a future economy with a drastic reduction in GHG emissions. And this in turn requires the development and massive deployment of new ...

Pérez-Arriaga, Ignacio J.

398

Energy Results of ISO 50001 Deployment by Program Administrators  

E-Print Network [OSTI]

Early Results of ISO 50001 Deployment by Utility Programs CHAD GILLESS PRACTICE LEAD, STRATEGIC ENERGY MANAGEMENT ENERNOC PORTLAND, OREGON KIM BROWN ASSOCIATE ENERNOC PORTLAND, OREGON DRESDEN SKEES- GREGORY SUSTAINABLE... Solutions Portland, OR Portland, OR Walnut Creek, CA ESL-IE-13-05-12 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA. May 21-24, 2013 2 Presentation Objectives ? Overview of current status ISO deployments...

Brown, K.; Gilless, C.; Milward, R.

2013-01-01T23:59:59.000Z

399

LET THE SUN SHINE: OPTIMAL DEPLOYMENT OF PHOTOVOLTAICS IN GERMANY  

E-Print Network [OSTI]

/kWh, depending on its location as well as on the size and type of PV system used (EPIA Report, 2011). InvestmentLET THE SUN SHINE: OPTIMAL DEPLOYMENT OF PHOTOVOLTAICS IN GERMANY Anna CRETI JĂ©rĂŽme JOAUG Cahier n:chantal.poujouly@polytechnique.edu hal-00751743,version1-14Nov2012 #12;Let the sun shine: optimal deployment of photovoltaics in Germany

Paris-Sud XI, Université de

400

Building Diagnostic Market Deployment - Final Report  

SciTech Connect (OSTI)

Operational faults are pervasive across the commercial buildings sector, wasting energy and increasing energy costs by up to about 30% (Mills 2009, Liu et al. 2003, Claridge et al. 2000, Katipamula and Brambley 2008, and Brambley and Katipamula 2009). Automated fault detection and diagnostic (AFDD) tools provide capabilities essential for detecting and correcting these problems and eliminating the associated energy waste and costs. The U.S. Department of Energy's (DOE) Building Technology Program (BTP) has previously invested in developing and testing of such diagnostic tools for whole-building (and major system) energy use, air handlers, chillers, cooling towers, chilled-water distribution systems, and boilers. These diagnostic processes can be used to make the commercial buildings more energy efficient. The work described in this report was done as part of a Cooperative Research and Development Agreement (CRADA) between the U.S. Department of Energy's Pacific Northwest National Laboratory (PNNL) and KGS Building LLC (KGS). PNNL and KGS both believe that the widespread adoption of AFDD tools will result in significant reduction to energy and peak energy consumption. The report provides an introduction and summary of the various tasks performed under the CRADA. The CRADA project had three major focus areas: (1) Technical Assistance for Whole Building Energy Diagnostician (WBE) Commercialization, (2) Market Transfer of the Outdoor Air/Economizer Diagnostician (OAE), and (3) Development and Deployment of Automated Diagnostics to Improve Large Commercial Building Operations. PNNL has previously developed two diagnostic tools: (1) whole building energy (WBE) diagnostician and (2) outdoor air/economizer (OAE) diagnostician. WBE diagnostician is currently licensed non-exclusively to one company. As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite, Clockworks. PNNL also provided validation data sets and the WBE software tool to validate the KGS implementation. OAE diagnostician automatically detects and diagnoses problems with outdoor air ventilation and economizer operation for air handling units (AHUs) in commercial buildings using data available from building automation systems (BASs). As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite. PNNL also provided validation data sets and the OAE software tool to validate the KGS implementation. Finally, as part of this CRADA project, PNNL developed new processes to automate parts of the re-tuning process and transfer those process to KGS for integration into their software product. The transfer of DOE-funded technologies will transform the commercial buildings sector by making buildings more energy efficient and also reducing the carbon footprint from the buildings. As part of the CRADA with PNNL, KGS implemented the whole building energy diagnostician, a portion of outdoor air economizer diagnostician and a number of measures that automate the identification of re-tuning measures.

Katipamula, S.; Gayeski, N.

2012-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NERSC Strategic Implementation Plan 2002-2006  

SciTech Connect (OSTI)

This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

2002-09-01T23:59:59.000Z

402

Information Technology Services (ITS) Strategic Plan  

E-Print Network [OSTI]

Information Technology Services (ITS) Strategic Plan Release Date August 2010 Empowering the University This is a document intended to guide strategy and operations for information technology at Dalhousie University. It will provide a framework for ITS and information technology deployed and used

Brownstone, Rob

403

E-Print Network 3.0 - area deployment scenario Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

L. Ruiz* --Juan C. Dueas* --Fernando Usero** -- Summary: for deployment in service oriented architectures. We will focus on a concrete scenario: service deployment... scenario,...

404

E-Print Network 3.0 - area networks deployment Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sciences 7 On Service Deployment in Ubiquitous Computing O. Ardaiz, F. Freitag, L. Navarro Summary: deployment. 1. Introduction "The introduction of new services into existing...

405

Dead-time compensation for a logarithmic display rate meter  

DOE Patents [OSTI]

An improved circuit is provided for application to a radiation survey meter that uses a detector that is subject to dead time. The circuit compensates for dead time over a wide range of count rates by producing a dead-time pulse for each detected event, a live-time pulse that spans the interval between dead-time pulses, and circuits that average the value of these pulses over time. The logarithm of each of these values is obtained and the logarithms are subtracted to provide a signal that is proportional to a count rate that is corrected for the effects of dead time. The circuit produces a meter indication and is also capable of producing an audible indication of detected events.

Larson, John A. (Aurora, IL); Krueger, Frederick P. (Aurora, IL)

1988-09-20T23:59:59.000Z

406

Clustering of Meter-wave Luminous Objects toward Monoceros  

E-Print Network [OSTI]

A distribution of the meter-wave luminous objects, which are bright at frequency 74 MHz (a wavelength of 4 m) but not detectable at 1.4 GHz (21 cm) in the VLA surveys, shows a notable concentration in a scale of a few degrees toward Monoceros [(l, b)=(225, 4)]. We argue that it is a part of giant radio relics associated with a nearby cluster of galaxies with cz~2400$ km s^{-1} centered on the spiral galaxy NGC 2377. The angular separation of these objects from the clustering center is consistent with the separation of distant relics to the cluster center if scaled by distance. This fact implies that the concentrations of meter-wave luminous objects can be used as a tracer of the structure of the Local Supercluster and it's vicinity.

Shuji Deguchi; Kazutaka Koike

2008-11-19T23:59:59.000Z

407

Dead-time compensation for a logarithmic display rate meter  

DOE Patents [OSTI]

An improved circuit is provided for application to a radiation survey meter that uses a detector that is subject to dead time. The circuit compensates for dead time over a wide range of count rates by producing a dead-time pulse for each detected event, a live-time pulse that spans the interval between dead-time pulses, and circuits that average the value of these pulses over time. The logarithm of each of these values is obtained and the logarithms are subtracted to provide a signal that is proportional to a count rate that is corrected for the effects of dead time. The circuit produces a meter indication and is also capable of producing an audible indication of detected events. 5 figs.

Larson, J.A.; Krueger, F.P.

1987-10-05T23:59:59.000Z

408

Smart Meter Privacy: A Utility-Privacy Framework  

E-Print Network [OSTI]

End-user privacy in smart meter measurements is a well-known challenge in the smart grid. The solutions offered thus far have been tied to specific technologies such as batteries or assumptions on data usage. Existing solutions have also not quantified the loss of benefit (utility) that results from any such privacy-preserving approach. Using tools from information theory, a new framework is presented that abstracts both the privacy and the utility requirements of smart meter data. This leads to a novel privacy-utility tradeoff problem with minimal assumptions that is tractable. Specifically for a stationary Gaussian Markov model of the electricity load, it is shown that the optimal utility-and-privacy preserving solution requires filtering out frequency components that are low in power, and this approach appears to encompass most of the proposed privacy approaches.

Rajagopalan, S Raj; Mohajer, Soheil; Poor, H Vincent

2011-01-01T23:59:59.000Z

409

The practical equity implications of advanced metering infrastructure  

SciTech Connect (OSTI)

Reductions in advanced metering costs and the efficiency benefits of dynamic pricing make a compelling case to adopt both, particularly for industrial and commercial facilities. Regulators should seriously consider such policies for residential households as well. Regulators can take meaningful steps to mitigate, if not entirely offset, the possibility that some low-income ratepayers may have higher electricity bills with AM and DP. (author)

Felder, Frank A.

2010-07-15T23:59:59.000Z

410

Hydrostatic bearings for a turbine fluid flow metering device  

DOE Patents [OSTI]

A rotor assembly fluid metering device has been improved by development of a hydrostatic bearing fluid system which provides bearing fluid at a common pressure to rotor assembly bearing surfaces. The bearing fluid distribution system produces a uniform film of fluid distribution system produces a uniform film of fluid between bearing surfaces and allows rapid replacement of bearing fluid between bearing surfaces, thereby minimizing bearing wear and corrosion.

Fincke, J.R.

1980-05-02T23:59:59.000Z

411

Naval Undersea Warfare Center Division Newport utilities metering, Phase 1  

SciTech Connect (OSTI)

Pacific Northwest Laboratory developed this report for the US Navy's Naval Undersea Warfare Center Division Newport, Rhode Island (NUWC). The purpose of the report was to review options for metering electricity and steam used in the NUWC compound, and to make recommendations to NUWC for implementation under a follow-on project. An additional NUWC concern is a proposed rate change by the servicing utility, Newport Electric, which would make a significant shift from consumption to demand billing, and what effect that rate change would have on the NUWC utility budget. Automated, remote reading meters are available which would allow NUWC to monitor its actual utility consumption and demand for both the entire NUWC compound and by end-use in individual buildings. Technology is available to perform the meter reads and manipulate the data using a personal computer with minimal staff requirement. This is not meant to mislead the reader into assuming that there is no requirement for routine preventive maintenance. All equipment requires routine maintenance to maintain its accuracy. While PNL reviewed the data collected during the site visit, however, it became obvious that significant opportunities exist for reducing the utility costs other than accounting for actual consumption and demand. Unit costs for both steam and electricity are unnecessarily high, and options are presented in this report for reducing them. Additionally, NUWC has an opportunity to undertake a comprehensive energy resource management program to significantly reduce its energy demand, consumption, and costs.

Carroll, D.M.

1992-11-01T23:59:59.000Z

412

Naval Undersea Warfare Center Division Newport utilities metering, Phase 1  

SciTech Connect (OSTI)

Pacific Northwest Laboratory developed this report for the US Navy`s Naval Undersea Warfare Center Division Newport, Rhode Island (NUWC). The purpose of the report was to review options for metering electricity and steam used in the NUWC compound, and to make recommendations to NUWC for implementation under a follow-on project. An additional NUWC concern is a proposed rate change by the servicing utility, Newport Electric, which would make a significant shift from consumption to demand billing, and what effect that rate change would have on the NUWC utility budget. Automated, remote reading meters are available which would allow NUWC to monitor its actual utility consumption and demand for both the entire NUWC compound and by end-use in individual buildings. Technology is available to perform the meter reads and manipulate the data using a personal computer with minimal staff requirement. This is not meant to mislead the reader into assuming that there is no requirement for routine preventive maintenance. All equipment requires routine maintenance to maintain its accuracy. While PNL reviewed the data collected during the site visit, however, it became obvious that significant opportunities exist for reducing the utility costs other than accounting for actual consumption and demand. Unit costs for both steam and electricity are unnecessarily high, and options are presented in this report for reducing them. Additionally, NUWC has an opportunity to undertake a comprehensive energy resource management program to significantly reduce its energy demand, consumption, and costs.

Carroll, D.M.

1992-11-01T23:59:59.000Z

413

Design of high pressure metering and regulating stations  

SciTech Connect (OSTI)

Metering and regulating stations effectively serve as the cash registers of the natural gas industry. While the potential for lost revenue resulting from improper design is a serious consideration, it is not the only one. The potential exists for problems such as excessive noise levels, inaccurate reflection of lost and unaccounted-for gas, and numerous potentially hazardous situations. The best time to limit the potential for problems is during the design process. This, together with the critical nature of these stations, dictates that proper design is imperative. Proper design of metering and regulating stations is a constantly changing and extremely complicated subject. There are virtually an infinite number of situations that the designer can encounter in evaluating his design. In view of this, it is impossible to develop a cookbook method of designing these stations that covers all possible situations. The emphasis of this paper is to briefly touch on the major aspects of metering and regulating station design. Steps involved in station design are: 1. Collection of data on the proposed station. 2. Determination of piping configuration. 3. Selection of measurement equipment. 4. Selection of pressure regulating and overpressure protection equipment. 5. Communication of the final design to field personnel.

Rehler, D.A. [Oklahoma Natural Gas Co., Enid, OK (United States)

1995-12-01T23:59:59.000Z

414

Deployment of Performance Management Methodology as part of Liquid Waste Program at Savannah River Site - 12178  

SciTech Connect (OSTI)

In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) at the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)

Prod'homme, A.; Drouvot, O.; Gregory, J. [AREVA, Paris (France); Barnes, B.; Hodges, B.; Hart, M. [SRR, Aiken, SC (United States)

2012-07-01T23:59:59.000Z

415

100 Meter Time of Flight System for Transmission Experiments Michael Rapp, Yaron Danon, Robert Block  

E-Print Network [OSTI]

100 Meter Time of Flight System for Transmission Experiments Michael Rapp, Yaron Danon, Robert of the detectors was chosen to take advantage of the neutron beam geometry at the detector location, 100 meters

Danon, Yaron

416

E-Print Network 3.0 - automatic survey meter Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at Amherst Collection: Environmental Sciences and Ecology 5 An Agent Based Simulation of Smart Metering TechnologyAdoption Summary: on the utility, to a 12;high-technology meter...

417

How Would You Use a Smart Meter to Manage Your Energy Use? |...  

Broader source: Energy.gov (indexed) [DOE]

Would You Use a Smart Meter to Manage Your Energy Use? How Would You Use a Smart Meter to Manage Your Energy Use? May 19, 2011 - 7:30am Addthis On Monday, Andrea told you about...

418

Feasibility of the design of dual-lane ramp meters in Texas  

E-Print Network [OSTI]

As recurrent congestion and the number of vehicles on urban freeways in Texas have increased, the ability to effectively meter traffic using single-lane ramp meters has deteriorated. Other state departments of transportation experiencing similar...

Butorac, Marc Allen

2012-06-07T23:59:59.000Z

419

Strategies for the Commercialization and Deployment of Greenhouse Gas Intensity-Reducing Technologies and Practices  

SciTech Connect (OSTI)

New technologies will be a critical component--perhaps the critical component--of our efforts to tackle the related challenges of energy security, climate change, and air pollution, all the while maintaining a strong economy. But just developing new technologies is not enough. Our ability to accelerate the market penetration of clean energy, enabling, and other climate-related technologies will have a determining impact on our ability to slow, stop, and reverse the growth in greenhouse gas (GHG) emissions. Title XVI, Subtitle A, of the Energy Policy Act of 2005 (EPAct 2005) directs the Administration to report on its strategy to promote the commercialization and deployment (C&D) of GHG intensity-reducing technologies and practices. The Act also requests the Administration to prepare an inventory of climate-friendly technologies suitable for deployment and to identify the barriers and commercial risks facing advanced technologies. Because these issues are related, they are integrated here within a single report that we, representing the Committee on Climate Change Science and Technology Integration (CCCSTI), are pleased to provide the President, the Congress, and the public. Over the past eight years, the Administration of President George W. Bush has pursued a series of policies and measures aimed at encouraging the development and deployment of advanced technologies to reduce GHG emissions. This report highlights these policies and measures, discusses the barriers to each, and integrates them within a larger body of other extant policy. Taken together, more than 300 policies and measures described in this document may be viewed in conjunction with the U.S. Climate Change Technology Program's (CCTP's) Strategic Plan, published in September 2006, which focuses primarily on the role of advanced technology and associated research and development (R&D) for mitigating GHG emissions. The CCTP, a multi-agency technology planning and coordination program, initiated by President Bush, and subsequently authorized in EPAct2005, is responsible for preparing this report on behalf CCCSTI. This report systematically examines the market readiness of key technologies important to meeting climate change mitigation goals. It assesses the barriers and business risks impeding their progress and greater market application. Importantly, by documenting the hundreds of Federal policies, programs, regulations, incentives, and other activities that are in effect and operating today to address these barriers, it provides a broad context for evaluating the adequacy of current policy and the potential need, if any, for additional measures that might be undertaken by government or industry. Finally, it draws conclusions about the current situation, identifies gaps and opportunities, and suggests analytical principles that should be applied to assess and formulate policies and measures to accelerate the commercialization and deployment of these technologies.

Committee on Climate Change Science and Technology Integration (CCCSTI)

2009-01-01T23:59:59.000Z

420

1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. HIGH-ACCURACY LASER POWER AND ENERGY METER CALIBRATION SYSTEM . . . . . . . . 2  

E-Print Network [OSTI]

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. HIGH-ACCURACY LASER POWER AND ENERGY METER CALIBRATION SYSTEM . . . . . . . . 2 2.1 Calibration

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Video game console usage and national energy consumption: Results from a field-metering study  

E-Print Network [OSTI]

with their free energy audit program. Meters were installedinstalled as part of an energy audit program. Users may be

Desroches, Louis-Benoit

2013-01-01T23:59:59.000Z

422

Status of Net Metering: Assessing the Potential to Reach Program Caps (Poster)  

SciTech Connect (OSTI)

Several states are addressing the issue of net metering program caps, which limit the total amount of net metered generating capacity that can be installed in a state or utility service territory. In this analysis, we examine net metering caps to gain perspective on how long net metering will be available in various jurisdictions under current policies. We also surveyed state practices and experience to understand important policy design considerations.

Heeter, J.; Bird, L.; Gelman, R.

2014-10-01T23:59:59.000Z

423

Status of Net Metering: Assessing the Potential to Reach Program Caps  

SciTech Connect (OSTI)

Several states are addressing the issue of net metering program caps, which limit the total amount of net metered generating capacity that can be installed in a state or utility service territory. In this analysis, we examine net metering caps to gain perspective on how long net metering will be available in various jurisdictions under current policies. We also surveyed state practices and experience to understand important policy design considerations.

Heeter, J.; Gelman, R.; Bird, L.

2014-09-01T23:59:59.000Z

424

United States- Land Based and Offshore Annual Average Wind Speed at 100 Meters  

Broader source: Energy.gov [DOE]

Full-size, high resolution version of the 100-meter land-based and offshore wind speed resource map.

425

Effects of geometric scaling on static pressure measurements in orifice flow-meters  

E-Print Network [OSTI]

. (Mech) University of Mysore, India Chair of Advisory Committee: Dr. G. L. Morrison It is estimated that there are over one million orifice meters in operation today in the United States of America. . The accuracy of these meters.... It is estimated that there are over one million orifice meters in operation today in the United States of America. The accuracy of these meters is such that uncertainties of millions of dollars a year result from their use [1]. The basic idea employed...

Sarker, Arunava

2012-06-07T23:59:59.000Z

426

Missing Data Handling for Meter Data Management System Ru-Sen Jeng1  

E-Print Network [OSTI]

Missing Data Handling for Meter Data Management System Ru-Sen Jeng1 , Chien-Yu Kuo1 , Yao-hua Ho1, Academia Sinica ABSTRACT We study the meter data management systems (MDMS) with a fo- cus on missing data meter data manage- ment systems. Categories and Subject Descriptors H.4.2 [Information Systems

Chen, Ling-Jyh

427

Meter as Mechanism: A Neural Network that Learns Metrical Michael Gasser, Douglas Eck and Robert Port  

E-Print Network [OSTI]

Meter as Mechanism: A Neural Network that Learns Metrical Patterns Michael Gasser, Douglas Eck that apparently underlies both music and some examples of speech production is meter. Yet detailed measurements of pulses that conform to particular meters. In addition, beginning with an initial state with no biases

Gasser, Michael

428

Feeling Music: Integration of Auditory and Tactile Inputs in Musical Meter Perception  

E-Print Network [OSTI]

Feeling Music: Integration of Auditory and Tactile Inputs in Musical Meter Perception Juan Huang1 are integrated in humans performing a musical meter recognition task. Subjects discriminated between two types coherent meter percepts, and 3) Simultaneously presented bimodal inputs where the two channels contained

Wang, Xiaoqin

429

Detecting Meter in Recorded Music Joseph E. Flannick, Rachel W. Hall, and Robert Kelly  

E-Print Network [OSTI]

Detecting Meter in Recorded Music Joseph E. Flannick, Rachel W. Hall, and Robert Kelly Dept) to identify the primary rhythmic content of pieces of popular music. The meter of such pieces is deter- mined of energy bursts in each band. We found that the meters of the pieces we analyzed were characterized

Hall, Rachel W.

430

Broadband precision wavelength meter based on a stepping FabryProt interferometer  

E-Print Network [OSTI]

Broadband precision wavelength meter based on a stepping Fabry­Pérot interferometer T. J. Scholl. INTRODUCTION Wavelength meters based on Michelson or Fizeau inter- ferometers have long been the standard a more general laser wavelength meter in which the FP ring pattern was employed to compare

Rehse, Steven J.

431

Meter Any Wire, Anywhere by Virtualizing the Voltage Channel Thomas Schmid, David Culler, Prabal Dutta  

E-Print Network [OSTI]

Meter Any Wire, Anywhere by Virtualizing the Voltage Channel Thomas Schmid, David Culler, Prabal}@eecs.umich.edu culler@cs.berkeley.edu Abstract AC power meters require both voltage and current to be sampled physical proximity and fed into a single power metering de- vice. In this paper, we explore the viability

Dutta, Prabal

432

Behavioral/Systems/Cognitive Selective Neuronal Entrainment to the Beat and Meter  

E-Print Network [OSTI]

Behavioral/Systems/Cognitive Selective Neuronal Entrainment to the Beat and Meter Embedded Fundamental to the experience of music, beat and meter perception refers to the perception of periodicities the spontaneous building of beat and meter hypothesized to emerge from the selective entrainment of neuronal

433

RIS-M-2243 THE RADIOCHROMIC DYE FILM DOSE METER AS A POSSIBLE TEST OF PARTICLE  

E-Print Network [OSTI]

RISĂ?-M-2243 THE RADIOCHROMIC DYE FILM DOSE METER AS A POSSIBLE TEST OF PARTICLE TRACK THEORY Johnny-film radlochromlc dye cyanide plastic dose meter to Ionizing radiation of electrons and heavy charged particles - 1. INTRODUCTION The radiochromic dye cyanide film dose meter has been investigated as a pos- sible

434

TRACKING THE "ODD": METER INFERENCE IN A CULTURALLY DIVERSE MUSIC CORPUS  

E-Print Network [OSTI]

TRACKING THE "ODD": METER INFERENCE IN A CULTURALLY DIVERSE MUSIC CORPUS Andre Holzapfel New York, containing a variety of meter types. We demonstrate that by adapting the model to specific styles, we can track beats and down- beats in odd meter types like 9/8 or 7/8 with an accuracy significantly improved

435

C-Meter: A Framework for Performance Analysis of Computing Clouds  

E-Print Network [OSTI]

C-Meter: A Framework for Performance Analysis of Computing Clouds Nezih Yigitbasi, Alexandru Iosup virtualization and network communications overheads. To address these issues, we have designed and implemented C-Meter of computing clouds. Then, we present the architecture of the C-Meter framework and discuss several resource

Iosup, Alexandru

436

Too expensive to meter: The influence of transaction costs in transportation and  

E-Print Network [OSTI]

Too expensive to meter: The influence of transaction costs in transportation and communication in their homes electrical energy too cheap to meter, ... It is not too much to expect that our children will know to age. Strauss' expression "too cheap to meter" has entered the lexicon as a catch

Odlyzko, Andrew M.

437

Infants Prefer the Musical Meter of Their Own Culture: A Cross-Cultural Comparison  

E-Print Network [OSTI]

Infants Prefer the Musical Meter of Their Own Culture: A Cross-Cultural Comparison Gaye Soley to determine whether cultural background would influence their preferences for musical meter. In Experiment 1, American infants preferred Western over Balkan meter, whereas Turkish infants, who were familiar with both

Ahmad, Sajjad

438

DESIGN OF INTELLIGENT CONDUCTIVITY METER BASED ON MSP430F149  

E-Print Network [OSTI]

DESIGN OF INTELLIGENT CONDUCTIVITY METER BASED ON MSP430F149 Yaoguang Wei, Jianqing Wang, Daoliang are agriculture information technology. dliangl@cau.edu.cn Abstract: An intelligent conductivity meter based on MSP430F149 microcontroller was proposed in this paper. The intelligent conductive meter was composed

439

DEVELOPMENT OF ONE METER-LONG LITHIUM PLASMA SOURCE AND EXCIMER MODE REDUCTION FOR PLASMA WAKEFIELD  

E-Print Network [OSTI]

DEVELOPMENT OF ONE METER-LONG LITHIUM PLASMA SOURCE AND EXCIMER MODE REDUCTION FOR PLASMA WAKEFIELD 94720 K. Marsh, P. Muggli, S. Wang, and C. Joshi, UCLA, Los Angeles, CA 90024 Abstract A one meter long reduction. 1 INTRODUCTION A one-meter long plasma source has been constructed which will permit

440

Neighborhood Watch: Security and Privacy Analysis of Automatic Meter Reading Systems  

E-Print Network [OSTI]

Neighborhood Watch: Security and Privacy Analysis of Automatic Meter Reading Systems Ishtiaq Rouf gruteser@winlab.rutgers.edu ABSTRACT Research on smart meters has shown that fine-grained en- ergy usage data poses privacy risks since it allows inferences about activities inside the home. While smart meter

Xu, Wenyuan

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Finding Meter in Music Using an Autocorrelation Phase Matrix and Shannon Douglas Eck  

E-Print Network [OSTI]

Finding Meter in Music Using an Autocorrelation Phase Matrix and Shannon Entropy Douglas Eck. This approach yields a good model for predicting the meter of a piece of music. Finally we can use the phase information in the matrix to align a can- didate meter with music, making it possible to perform beat

Eck, Doug

442

meters in CO2 euthanasia chambers. All CO2 euthanasia chambers in both  

E-Print Network [OSTI]

meters in CO2 euthanasia chambers. All CO2 euthanasia chambers in both the facilities and laboratories will need flow meters. ULAR is currently in the process of identifying a cost-effective, accurate, and durable flow meter to install in all of the CO2 chambers in all of the vivaria. When a specific model

Bushman, Frederic

443

A Scalable Soft Spot Analysis Methodology for Compound Noise Effects in Nano-meter Circuits  

E-Print Network [OSTI]

A Scalable Soft Spot Analysis Methodology for Compound Noise Effects in Nano-meter Circuits Chong@ece.ucsd.edu ABSTRACT Circuits using nano-meter technologies are becoming increasingly vulnerable to signal interference methodology to study the vulnerability of digital ICs exposed to nano-meter noise and transient soft errors

California at San Diego, University of

444

Principle and implementations of a refracto-nephelo-turbidi-meter for  

E-Print Network [OSTI]

1 Principle and implementations of a refracto-nephelo-turbidi-meter for seawater measurements B of physical oceanography requires a compact high-resolution in-situ salino-turbidi-meter to measure these two the requirements and challenges of refracto-turbidi-meter design from their measurement principles and correlations

Paris-Sud XI, Université de

445

Behavioral/Systems/Cognitive Tagging the Neuronal Entrainment to Beat and Meter  

E-Print Network [OSTI]

Behavioral/Systems/Cognitive Tagging the Neuronal Entrainment to Beat and Meter Sylvie Nozaradan,1 (BRAMS), UniversiteÂŽ de MontreÂŽal, Quebec C.P. 6128 H3C 3J7, Canada Feeling the beat and meter to the beat frequency. Most importantly, we found that meter imagery elicits an additional frequency tuned

446

A model of the VU (volume-unit) meter, with speech applications Bryce Lobdell  

E-Print Network [OSTI]

A model of the VU (volume-unit) meter, with speech applications Bryce Lobdell Jont Allen Beckman Institute, University of Illinois Urbana, IL 61801 (October 11, 2006) Running title: volume unit meter usage ABSTRACT The Volume Unit (VU) meter, used in speech research prior to the ad- vent of computers and modern

Allen, Jont

447

Gemini: A Non-Invasive, Energy-Harvesting True Power Meter Bradford Campbell and Prabal Dutta  

E-Print Network [OSTI]

Gemini: A Non-Invasive, Energy-Harvesting True Power Meter Bradford Campbell and Prabal Dutta,prabal}@umich.edu Abstract--Power meters are critical for submetering loads in residential and commercial settings, but high by proposing non-invasive meters that easily clip onto a wire, or stick onto a circuit breaker, to perform

Dutta, Prabal

448

Too expensive to meter: The influence of transaction costs in transportation and  

E-Print Network [OSTI]

Too expensive to meter: The influence of transaction costs in transportation and communication to meter, ... It is not too much to expect that our children will know of great periodic regional famines to meter'' has entered the lexicon as a catch­phrase for technological promises that have gone unfulfilled

Odlyzko, Andrew M.

449

Reference Directions for a Sound Level Meter , M.R. Vaabenb  

E-Print Network [OSTI]

0 and 90 Reference Directions for a Sound Level Meter E. Aflaloa , M.R. Vaabenb , P. Pourtaua , D the requirements of the IEC 61672 standard on sound level meters taking into account noise incidence from level meter must be pointed at the source according to standard IEC 60651. The purpose of the paper

Paris-Sud XI, Université de

450

Evaluating Government's Policies on Promoting Smart Metering Diffusion in Retail Electricity Markets via  

E-Print Network [OSTI]

Evaluating Government's Policies on Promoting Smart Metering Diffusion in Retail Electricity on promoting smart metering in the U.K. retail electricity market. We break down the policy into four possible recommendations for the energy mar- ket is the adoption of smart metering technology, which, in addition

Tesfatsion, Leigh

451

eMeter: An interactive energy monitor In this work, we propose an interactive load monitoring  

E-Print Network [OSTI]

level. Therefore, we extended the capabilities of a smart elec- tricity meter and developed a mobile interfaces Merging smart meters and mobile devices Timely consumption feedback and guidance with re- spectComp 2009, Sep 30 ­ Oct 3, 2009, Orlando, FL, USA #12;household once smart meters are introduced. We wanted

452

Efficient and Secure Wireless Communications for Advanced Metering Infrastructure in Smart Grids  

E-Print Network [OSTI]

1 Efficient and Secure Wireless Communications for Advanced Metering Infrastructure in Smart Grids metering infrastructure (AMI) [3] is a key task in smart grid [6] [4]. In such a system, each power user is equipped with a smart meter with the capability of two- way communications, which can monitor the power

Qiu, Robert Caiming

453

A Distortion-Theoretic Perspective for Redundant Metering Security in a Smart Grid  

E-Print Network [OSTI]

A Distortion-Theoretic Perspective for Redundant Metering Security in a Smart Grid Mustafa El--In a smart grid environment some customers employ third-party meters and terminals for integrity verification of the smart meter power measurements reported by the electric utility company. We address the security issues

Kundur, Deepa

454

VentureBeat Smart meters could breathe life into flagging chip market  

E-Print Network [OSTI]

VentureBeat Smart meters could breathe life into flagging chip market April 1, 2009 | Camille Ricketts Even as the downturn dries up cleantech capital, smart-meter makers continue to do quite well, and major utilities like PG&E jumping on board, it looks like the smart-meter industry will hold strong

Lu, Chenyang

455

AgSec: Secure and Efficient CDMA-based Aggregation for Smart Metering Systems  

E-Print Network [OSTI]

AgSec: Secure and Efficient CDMA-based Aggregation for Smart Metering Systems Navid Alamatsaz-based data aggregation method provides access to all the data of all the smart meters in the root node, which in this case is the Utility Center, while keeping the smart metering data secure. The efficiency

Namboodiri, Vinod

456

Social Network of Smart-Metered Homes and SMEs for Grid-based Renewable Energy Exchange  

E-Print Network [OSTI]

Social Network of Smart-Metered Homes and SMEs for Grid-based Renewable Energy Exchange Ioana G system on top of smart metering and social web technologies. This is achieved using a framework to connect dynamic, context-aware, heterogeneous virtual and real entities on the Internet of Smart Meters

Steels, Luc

457

Proposed Metering and Instrumentation Monitoring and Analysis Plan and Budget: Alamo Community College District  

E-Print Network [OSTI]

, it will be necessary to install additional software (PCAnywhere) or equipment (mainly another PC workstation) near the existing EMS computer terminals. ESL would also like Ethernet lines connected to the PC workstation so the system could be accessed via Internet...

O'Neal, D. L.; Carlson, K. A.; Sweeney, J., Jr.; Milligan, K.

2002-01-01T23:59:59.000Z

458

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

459

Scaling up and deployment of FGD in the US (1960s-2009)  

E-Print Network [OSTI]

.3 DEPLOYMENT UNDER EMISSIONS TRADING: THE 1990S AND 2000S ..................18 4 INTERACTION WITH OTHER

460

Scientific Workflows Composition and Deployment on SOA Frameworks  

SciTech Connect (OSTI)

Scientific workflows normally consist of multiple applications acquiring and transforming data, running data intensive analyses and visualizing the results for scientific discovery. To compose and deploy such scientific workflows, an SOA platform can provide integration of third-party components, services, and tools. In this paper, we present our application of Service-Oriented Architecture (SOA) to compose and deploy systems biology workflows. In developing this application, our solution uses MeDICi a middleware framework built on SOA platforms as an integration layer. We discuss our experience and lessons learnt about this solution that are generally applicable to scientific workflows in other domains.

Liu, Yan; Gorton, Ian; Wynne, Adam S.; Kulkarni, Anand V.

2011-12-12T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Leading the Nation in Clean Energy Deployment (Fact Sheet)  

SciTech Connect (OSTI)

This document summarizes key efforts and projects that are part of the DOE/NREL Integrated Deployment effort to integrated energy efficiency and renewable energy technologies in cities, states, island locations, and communities around the world. The U.S. Department of Energy (DOE) is pursuing an aggressive, scalable, and replicable strategy to accelerate market adoption of clean energy solutions to power homes, businesses, and vehicles. Using the comprehensive Integrated Deployment approach developed by the National Renewable Energy Laboratory (NREL), DOE partners with communities, cities, states, federal agencies, and territories to identify and implement a variety of efficiency and renewable energy technology solutions.

Not Available

2012-07-01T23:59:59.000Z

462

The Coldest Cubic Meter in the Known Universe  

E-Print Network [OSTI]

CUORE is a 741 kg array of TeO2 bolometers that will search for the neutrinoless double beta decay of 130Te. The detector is being constructed at the Laboratori Nazionali del Gran Sasso in Italy, where it will begin taking data in 2015. The CUORE cryostat will cool several metric tonnes of material to below 1 K and the CUORE detector itself will operate at a typical temperature of 10 mK. At this temperature, the CUORE detector will be the coldest contiguous cubic meter in the known Universe.

Jonathan Ouellet

2014-10-14T23:59:59.000Z

463

Meter-baseline tests of sterile neutrinos at Daya Bay  

E-Print Network [OSTI]

We explore the sensitivity of an experiment at the Daya Bay site, with a point radioactive source and a few meter baseline, to neutrino oscillations involving one or more eV mass sterile neutrinos. We find that within a year, the entire 3+2 and 1+3+1 parameter space preferred by global fits can be excluded at the 3\\sigma level, and if an oscillation signal is found, the 3+1 and 3+2 scenarios can be distinguished from each other at more than the 3\\sigma level provided one of the sterile neutrinos is lighter than 0.5 eV.

Y. Gao; D. Marfatia

2013-05-07T23:59:59.000Z

464

Portable Liquid Flow Metering for Energy Conservation Programs  

E-Print Network [OSTI]

.c. jJ = 0.5 3. PERMANENT PRESSURE LOSS: PPL o = 72" w.c. See Table 3 4. HORSEPOWER REQUIRED TO MAKE UP PERMANENT PRESSURE LOSS: HP o = GPM x PPLo x SP. Gr. 38,000* (600) (72 )(1. 0) 38,000 HP o = 1.14 HP * Constant corrects for units...-7, 1982 TABLE 3 PERMANENT PRESSURE LOSS (PPL o ) FOR ORIFICE METERS 140 120 100 80 60 40 20 0 00?? '0 0.2 0.3 0.4 0.5 0.6 07 Beta ratio (d/Dl CONCLUSIONS Ultrasonic flowmetering offers an effec tive way to measure liquids in energy...

Miles, F. J.

1982-01-01T23:59:59.000Z

465

The Coldest Cubic Meter in the Known Universe  

E-Print Network [OSTI]

CUORE is a 741 kg array of TeO2 bolometers that will search for the neutrinoless double beta decay of 130Te. The detector is being constructed at the Laboratori Nazionali del Gran Sasso in Italy, where it will begin taking data in 2015. The CUORE cryostat will cool several metric tonnes of material to below 1 K and the CUORE detector itself will operate at a typical temperature of 10 mK. At this temperature, the CUORE detector will be the coldest contiguous cubic meter in the known Universe.

Ouellet, Jonathan

2014-01-01T23:59:59.000Z

466

MSET modeling of Crystal River-3 venturi flow meters.  

SciTech Connect (OSTI)

The analysis of archived Crystal River-3 feedwater flow data reveals a slow and steady degradation of the flow meter measurements during the 1992/1993 operating cycle. MSET can reliably estimate the true flow rate and quantify the degree of departure between the indicated signal and the true flow rate with high accuracy. The MSET computed flow rate could, in principle, be used to provide an improved estimate of the reactor power and hence avoid the revenue loss associated with derating the reactor based on a faulty feedwater flow rate indication.

Bockhorst, F. K.; Gross, K. C.; Herzog, J. P.; Wegerich, S. W.

1998-01-05T23:59:59.000Z

467

EPAct 2005 Metering Guidance Overview | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealingVehicle1:EnergyDecemberof Energy87:EPAct 2005 Metering

468

O&M Metering Guidance | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced ScorecardReactor Technology Subcommittee of NEACSummaryO&M Metering

469

BPA Metering Services Editing and Estimating Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA t iBudget2/4/139/4/2012 BnotMetering

470

Smart Meter Investments Support Rural Economy in Arkansas  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of Energy U.S. DepartmentCommitmentGovernmentSmart Cities - 1 SmartSmart Meter

471

Cyprus Smart metering demo (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (The following text isRica NRELPower Comm JumpCyprus Smart metering

472

The magnetic flywheel flow meter: Theoretical and experimental contributions  

SciTech Connect (OSTI)

The development of contactless flow meters is an important issue for monitoring and controlling of processes in different application fields, like metallurgy, liquid metal casting, or cooling systems for nuclear reactors and transmutation machines. Shercliff described in his book “The Theory of Electromagnetic Flow Measurement, Cambridge University Press, 1962” a simple and robust device for contact-less measurements of liquid metal flow rates which is known as magnetic flywheel. The sensor consists of several permanent magnets attached on a rotatable soft iron plate. This arrangement will be placed closely to the liquid metal flow to be measured, so that the field of the permanent magnets penetrates into the fluid volume. The flywheel will be accelerated by a Lorentz force arising from the interaction between the magnetic field and the moving liquid. Steady rotation rates of the flywheel can be taken as a measure for the mean flow rate inside the fluid channel. The present paper provides a detailed theoretical description of the sensor in order to gain a better insight into the functional principle of the magnetic flywheel. Theoretical predictions are confirmed by corresponding laboratory experiments. For that purpose, a laboratory model of such a flow meter was built and tested on a GaInSn-loop under various test conditions.

Buchenau, D., E-mail: d.buchenau@hzdr.de; Galindo, V.; Eckert, S. [Helmholtz-Zentrum Dresden-Rossendorf, Institute of Fluid Dynamics, Bautzner Landstraße 400, 01328 Dresden (Germany)

2014-06-02T23:59:59.000Z

473

Modelling PV Deployment: A Tool Developed at CEEP to  

E-Print Network [OSTI]

Modelling PV Deployment: A Tool Developed at CEEP to Explore the Delaware Market Energy and the University of Delaware August 2014 #12;Center for Energy and Environmental Policy The Center for Energy in energy, environmental, and sustainable development policy. The Center serves as a University-wide forum

Delaware, University of

474

Visual Design of Service Deployment in Complex Physical Environments  

E-Print Network [OSTI]

Visual Design of Service Deployment in Complex Physical Environments Augusto Celentano and Fabio for in- teractive services in complex physical environments using a knowl- edge based approach to define the relations between the environ- ment and the services, and a visual interface to check the associated

Celentano, Augusto

475

WLDF 311 Treefrog Study; Fall 2007 PVC Pipe Deployment Protocol  

E-Print Network [OSTI]

WLDF 311 Treefrog Study; Fall 2007 PVC Pipe Deployment Protocol: 1. Arrange time to meet should include: a. 12 pipes with caps (there should be ~3 pipes on "your" transects out in the field & place trap on the stake (using hole near top of pipe for screw head). e. Record UTM positions (easting

Johnson, Matthew

476

China's rapid deployment of SO2 scrubbers Robert H. Williamsb  

E-Print Network [OSTI]

China's rapid deployment of SO2 scrubbers Yuan Xu,*a Robert H. Williamsb and Robert H. Socolowcth March 2009 DOI: 10.1039/b901357c Details are gradually emerging regarding China's extraordinary also describe novel policies enacted by China in 2007 to increase the likelihood that installed

477

Optimization of Hydroacoustic Equipment Deployment at Foster Dam, 2013  

SciTech Connect (OSTI)

The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Foster Dam (FOS) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. Optimization of the hydroacoustic systems will establish methodology for sampling by active acoustic methods during this year-long evaluation of juvenile salmonid passage at FOS.

Hughes, James S.; Johnson, Gary E.; Ploskey, Gene R.; Hennen, Matthew J.; Fischer, Eric S.; Zimmerman, Shon A.

2013-03-01T23:59:59.000Z

478

Model-driven Security Policy Deployment: Property Oriented Approach  

E-Print Network [OSTI]

and managing the access control rules of an information system are some of the major concerns of security systems. We formally prove the process of de- ploying a security policy related to an information system the deployment of access control security policies. We show how the use of a formal ex- pression of the security

Garcia-Alfaro, Joaquin

479

Deploying An Electronic Medical Record System in Rural Rwanda  

E-Print Network [OSTI]

Deploying An Electronic Medical Record System in Rural Rwanda Yaw Anokwa1 , Christian Allen2 asked Partners in Health to help build a national health care system. A small town named Rwinkwavu was chosen as the home of one of the first comprehensive health care systems in Africa. To help manage

Anderson, Richard

480

Integrated Deployment and the Energy Systems Integration Facility: Workshop Proceedings  

SciTech Connect (OSTI)

This report summarizes the workshop entitled: Integrated Deployment and the Energy Systems Integration Facility. In anticipation of the opening of the ESIF, NREL held the workshop August 21-23, 2012 and invited participants from utilities, government, industry, and academia to discuss renewable integration challenges and discover new ways to meet them by taking advantage of the ESIF's capabilities.

Kroposki, B.; Werner, M.; Spikes, A.; Komomua, C.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "meter deployments plans" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Space Systems Finland 1 Deployment in the Space Sector  

E-Print Network [OSTI]

© Space Systems Finland 1 Deployment in the Space Sector #12;© Space Systems Finland 2 SW Constraints Design Requirements User Requirements SW Requirements #12;© Space Systems Finland 3 The space, but there is no viable alternative · Many requirements are not testable #12;© Space Systems Finland 4 SSF OBJECTIVES

Southampton, University of

482

Development and Deployment at Facebook Dror G. Feitelson  

E-Print Network [OSTI]

Development and Deployment at Facebook Dror G. Feitelson Hebrew University Eitan Frachtenberg Facebook Kent L. Beck Facebook Abstract More than one billion users log in to Facebook at least once-end. Information on Facebook's architecture and other software components is available elsewhere. Keywords D.2.10.i

Feitelson, Dror

483

FROGi: Fractal components deployment over OSGi Mikael Desertot1 3  

E-Print Network [OSTI]

FROGi: Fractal components deployment over OSGi Mikael Desertot1 3 , Humberto Cervantes2 and Didier, a proposal to support continuous de- ployment activities inside Fractal, a hierarchical component model of Fractal components. With FROGi, it is possible to automate the assembly of a Fractal component application

Donsez, Didier

484

DEPLOYMENT OF JAVA-BASED COMPONENTS IN EMBEDDED ENVIRONMENT*  

E-Print Network [OSTI]

, which have to be adapted, are the deployment process and the runtime environment. The rest different capabilities like different user input and output methods, different provided API, etc of the paper is as follows. The rest of this Section briefly describes the SOFA 2.0 (for short, SOFA in further

485

Poster Abstract: Community Sensor Grids Deployment and Usage  

E-Print Network [OSTI]

and Informatics Arizona State University Tempe, AZ 85287 partha@asu.edu Amiya Bhattacharya Department of Computer Science New Mexico State University Las Cruces, NM 88003 amiya@nmsu.edu Meddage S. Fernando Department is that individuals or small community agencies may deploy sensors to cover their own property, but also make them

Bhattacharya, Amiya

486

Evaluation of Future Energy Technology Deployment Scenarios for  

E-Print Network [OSTI]

Subtask 2.1 Report By the University of Hawaii Hawaii Natural Energy Institute School of Ocean and EarthEvaluation of Future Energy Technology Deployment Scenarios for the Big Island Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Award No. DE-FC-06NT42847

487

Planning Tool for Strategic Evaluation of Facility Plans - 13570  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

Magoulas, Virginia; Cercy, Michael [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States)] [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Hall, Irin [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)] [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)

2013-07-01T23:59:59.000Z

488

Sustainability of Very Large Photovoltaic DeploymentSustainability of Very Large Photovoltaic Deployment email: vmf5@columbia.edu  

E-Print Network [OSTI]

1 Sustainability of Very Large Photovoltaic DeploymentSustainability of Very Large Photovoltaic for Life Cycle Analysis Columbia University and National Photovoltaics Environmental Research Center, 2006 - Fthenakis & Alsema, Progress in Photovoltaics, 14, 275, 2006 #12;9 0 200 400 600 800 1000 1200

Ohta, Shigemi

489

Deployment Effects of Marine Renewable Energy Technologies: Wave Energy Scenarios  

SciTech Connect (OSTI)

Given proper care in siting, design, deployment, operation and maintenance, wave energy conversion could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that, due to a lack of technical certainty, many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood,. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based assessment to the emerging hydrokinetic technology sector in order to evaluate the potential impact of these technologies on the marine environment and navigation constraints. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios capture variations in technical approaches and deployment scales to properly identify and characterize environmental effects and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential range of technical attributes and potential effects of these emerging technologies and focus all stakeholders on the critical issues that need to be addressed. By identifying and addressing navigational and environmental concerns in the early stages of the industry’s development, serious mistakes that could potentially derail industry-wide development can be avoided. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory issues (Pacific Energy Ventures) and navigational issues (PCCI). The results of this study are structured into three reports: (1) Wave power scenario description (2) Tidal power scenario description (3) Framework for Identifying Key Environmental Concerns This is the first report in the sequence and describes the results of conceptual feasibility studies of wave power plants deployed in Humboldt County, California and Oahu, Hawaii. These two sites contain many of the same competing stakeholder interactions identified at other wave power sites in the U.S. and serve as representative case studies. Wave power remains at an early stage of development. As such, a wide range of different technologies are being pursued by different manufacturers. In order to properly characterize potential effects, it is useful to characterize the range of technologies that could be deployed at the site of interest. An industry survey informed the process of selecting representative wave power devices. The selection criteria requires that devices are at an advanced stage of development to reduce technical uncertainties, and that enough data are available from the manufacturers to inform the conceptual design process of this study. Further, an attempt is made to cover the range of different technologies under development to capture variations in potential environmental effects. Table 1 summarizes the selected wave power technologies. A number of other developers are also at an advanced stage of development, but are not directly mentioned here. Many environmental effects will largely scale with the size of the wave power plant. In many cases, the effects of a single device may not be measurable, while larger scale device arrays may have cumulative impacts that differ significantly from smaller scale deployments. In order to characterize these effects, scenarios are established at three deployment scales which nominally represent (1) a small pilot deployment, (2) a small commercial deployment, and (3) a large commercial sc

Mirko Previsic

2010-06-17T23:59:59.000Z

490

Quantum Metrology: Towards an alternative definition for the meter  

E-Print Network [OSTI]

The motivation for this article came from an attempt to give an alternative definition for the meter, the SI unit for measuring length. As a starting point towards this goal, in this piece of work we present the underlying theory behind our approach which uses ideas from quantum field theory and noncommutative geometry, in particular the notion of an odd K-cycle which is based on the Dirac operator (and its inverse, the Dirac propagator). Using (the perhaps more familiar) physics terminology, the key point in our strategy is this: instead of measuring length directly in space-time we measure the "algebraic (spectral) length" in the space of the corresponding quantum states of some particle (fermion) acted upon by the Dirac propagator. This approach shares the spirit of the unanimus vote of the 24th General Conference of Standards and Measures (21st October 2011) in Serves, France for the redefinition of the fundamental units using Planck's constant.

Ioannis P. Zois

2012-03-05T23:59:59.000Z

491

Photoelastic stress analysis on a Phoenix 7. 9-meter blade  

SciTech Connect (OSTI)

Photoelastic tests were conducted on the Phoenix 7.9-meter blade to develop the basic methodology for locating critical strain areas on full-scale composite structures. Under relatively low elastic loading the strain fields over various regions on the blade planform were documented with 35mm photographs under different loading conditions at the Solar Energy Research Institute (SERI) Structural Test Facility (STF). Strain concentrations were easily located and quantified. Principal strain magnitudes and directions were determined at the highest strain areas using separator gages. Results were compared to measured operating loads. This experiment demonstrated the value of experimental stress analysis using the photoelastic technique for the evaluation of composite blade designs. 9 refs., 6 figs., 3 tabs.

Musial, W.D.; Jenks, M.D.; Osgood, R.M.; Johnson, J.A.

1991-10-01T23:59:59.000Z

492

Mooring Motion Bias of Point-Doppler Current Meter Measurements Paul Freitag, Michael McPhaden, Chris Meinig, Patricia Plimpton  

E-Print Network [OSTI]

Mooring Motion Bias of Point-Doppler Current Meter Measurements Paul Freitag, Michael Mc). Until 1998 the moorings were instrumented with mechanical current meters (MCMs, either Vector Averaging Current Meters (VACM) or Vector Measuring Current Meters (VMCM)). Comparison with nearby subsurface 150 k

493

Abstract--A methodology to evaluate the installation of new electricity metering technologies in a developing country is  

E-Print Network [OSTI]

customer database, identifying a particular urban zone in which, under certain assumptions, smart metering. Although smart metering would provide benefits to all society, customers originating these benefits would only perceive a small part of them. Index Terms-- Demand Response, Advanced Metering, Smart Meters

Dixon, Juan

494

2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Smart Meters, Rates and the Customer  

E-Print Network [OSTI]

© 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Smart Meters, OR #12;2 SDG&E Smart Meter Goals · Install AMI/smart metering for all SDG&E electric and gas business're starting to recreate our relationship with customers and transform our company #12;Smart Meter Business

495

Meter Damage: Many customers have questions about who is responsible for repair to the electrical service at their homes. These pages may help to answer  

E-Print Network [OSTI]

Meter Damage: Many customers have questions about who is responsible for repair. weather head stack meter base connectors house knob weather head connectors mast clamp stack meter base meter meter #12; Let's start with definitions: Meter base: This is the metal box mounted

Rose, Annkatrin

496

High-Penetration PV Deployment in the Arizona Public Service System, Phase 1 Update: Preprint  

SciTech Connect (OSTI)

In an effort to better understand the impacts of high penetrations of photovoltaic generators on distribution systems, Arizona Public Service and its partners have begun work on a multi-year project to develop the tools and knowledge base needed to safely and reliably integrate high penetrations of utility- and residential-scale photovoltaics (PV). Building upon the APS Community Power Project -- Flagstaff Pilot, this project will analyze the impact of PV on a representative feeder in northeast Flagstaff. To quantify and catalog the effects of the estimated 1.3 MW of PV that will be installed on the feeder (both smaller units at homes as well as large, centrally located systems), high-speed weather and electrical data acquisition systems and digital 'smart' meters are being designed and installed to facilitate monitoring and to build and validate comprehensive, high-resolution models of the distribution system. These models will be used to analyze the impacts of the PV on distribution circuit protection systems (including anti-islanding), predict voltage regulation and phase balance issues, and develop volt/var control schemes. This paper continues from a paper presented at the 2011 IEEE PVSC conference that introduces the project and describes some of the preliminary consideration, as well as project plans and early results. This paper gives a status update of the project and presents selected results from Phase 2 of the project. It discusses baseline feeder modeling, load allocation, data acquisition, utility-scale PV integration, preliminary model validation, and plans for future phases.

Hambrick, J.; Narang, D.

2012-06-01T23:59:59.000Z

497

Geographical Information Systems: An Effective Rural ITS Planning, Deployment and Evaluation Tool  

E-Print Network [OSTI]

corridor; the Western Transportation Institute (WTI) is to provide a feasibility assessment, evaluation Resources Inc., ARC-INFO software, WTI is defining problems; prioritizing problems; identifying existing and traffic operations personell. Through the use of GIS, WTI will be able to develop scenarios

McGowen, Patrick

498

Optimal Deployment Plan of Emission Reduction Technologies for TxDOT's Construction Equipment  

E-Print Network [OSTI]

Gas ....................................................................... 24 Biodiesel ............................................................................ 24 Hydrogen... Repower and Rebuild Exhaust Gas Recirculation Crankcase Emission Control Fuel Technologies Low-Sulfur and Ultra Low-Sulfur Diesel Natural Gas Biodiesel Hydrogen Fuel Additive Hydrogen Enrichment 17 Exhaust Gas Aftertreatment Technologies...

Bari, Muhammad Ehsanul

2010-10-12T23:59:59.000Z

499

Analyzing the Deployment of Large Amounts of Offshore Wind to Design an Offshore Transmission Grid in the United States: Preprint  

SciTech Connect (OSTI)

This paper revisits the results from the U.S. Department of Energy's '20% Wind Energy By 2030' study, which envisioned that 54 GW of offshore wind would be installed by said year. The analysis is conducted using the Regional Energy Deployment System (ReEDS), a capacity expansion model developed by the National Renewable Energy Laboratory. The model is used to optimize the deployment of the 54 GW of wind capacity along the coasts and lakes of the United States. The graphical representation of the results through maps will be used to provide a qualitative description for planning and designing an offshore grid. ReEDS takes into account many factors in the process of siting offshore wind capacity, such as the quality of the resource, capital and O&M costs, interconnection costs, or variability metrics (wind capacity value, forecast error, expected curtailment). The effect of these metrics in the deployment of offshore wind will be analyzed through examples in the results.

Ibanez, E.; Mai, T.; Coles, L.

2012-09-01T23:59:59.000Z

500

NIST Special Publication 1039r1 Liquid Flow Meter Calibrations with the  

E-Print Network [OSTI]

NIST Special Publication 1039r1 Liquid Flow Meter Calibrations with the 0.1 L/s and the 2.5 L Publication 1039r1 Liquid Flow Meter Calibrations with the 0.1 L/s and the 2.5 L/s Piston Provers Jodie G. Technol. Spec. Publ. 1039r1, 55 pages (December 2013) CODEN: NSPUE2 #12;Liquid Flow Meter Calibrations