National Library of Energy BETA

Sample records for meeting requirements guides

  1. Meeting Federal Energy Security Requirements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  2. November 17 PSERC Webinar: Meeting PMU Data Quality Requirements...

    Office of Environmental Management (EM)

    November 17 PSERC Webinar: Meeting PMU Data Quality Requirements for Mission Critical Applications November 17 PSERC Webinar: Meeting PMU Data Quality Requirements for Mission...

  3. Cancellation Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Guide by Website Administrator Microsoft Word Document icon CancellationNotice-Guides (4).doc - Microsoft Word Document, 30 KB (31232

  4. Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA Outage Coordination Presentation NOA - General References Guide Draft NOC Charter Demand Response NOC Meeting Notes - 6122014 April 23, 2014 NT Redispatch Meeting NT...

  5. Audit Services Requirements Discussed In Guide Chapter 42.101...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Requirements Discussed In Guide Chapter 42.101- By Contract Types (Contract types ... contracts) See the audit services requirements above for fixed-price ...

  6. Update of Acquisition Guide Chapter 6.1, "Competition Requirements"

    Broader source: Energy.gov [DOE]

    Policy Flash 201 0-05, issued on October 15,2009, provided an overview of Federal Acquisition Circular (FAC) 2005-37. In reference to Policy Flash 2010-05, the subject Acquisition Guide Chapter has been updated to prescribe Department of Energy implementing procedures pursuant to changes to Federal Acquisition Regulation 6.302-2 which now limits the length of contracts awarded noncompetitively under unusual and compelling urgency circumstances to the minimum contract period necessary to meet the requirements, and no longer than one year, unless the head of the agency determines that exceptional circumstances apply. The chapter is revised to state that the Senior Procurement Executive can make the determination that exceptional circumstances apply. It also includes additional guidance when these exceptional circumstances apply.

  7. Requirements-Based Surveillance and Maintenance Review Guide | Department

    Office of Environmental Management (EM)

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National Bridge Inventory Record Data Submission Requirement of Energy

    Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to provide organizations with the knowledge and tools necessary to

  8. Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-03-18

    This Guide provides a complete description of what Technical Safety Requirements should contain and how they should be developed and maintained. This revision of the guide provides new guidance on Technical Safety Requirements for Specific Administrative Controls, incorporates and addresses lessons learned, and makes clarifications and organization changes to improve usability. Supersedes DOE G 423.1-1A.

  9. Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-09-08

    The guide was developed in support of Title 10 Code of Federal Regulations (CFR) Part 830, Nuclear Safety Management. It provides guidance for the requirements defined in 10 CFR 830.205, Technical Safety Requirements.

  10. Amount of Zeolite Required to Meet the Constraints Established...

    Office of Environmental Management (EM)

    of Zeolite Required to Meet the Constraints Established by the Energetic Materials Research and Testing Center (EMRTC) Report RF 10-13: Application of Los Alamos National...

  11. November 17 PSERC Webinar: Meeting PMU Data Quality Requirements for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission Critical Applications | Department of Energy 7 PSERC Webinar: Meeting PMU Data Quality Requirements for Mission Critical Applications November 17 PSERC Webinar: Meeting PMU Data Quality Requirements for Mission Critical Applications November 13, 2015 - 3:25pm Addthis Phasor Measurement Units (PMU's) provide synchronized measurements at high rates for wide area situational awareness and decision support for mission critical applications. High quality PMU data is vital for these

  12. Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-03

    This Guide provides elaboration for the content of TSRs. Section 10 CFR 830.205 of the Nuclear Safety Management rule, requires Department of Energy (DOE) contractors responsible for category 1, 2, and 3 DOE nuclear facilities to develop Technical Safety Requirements (TSRs). These TSRs identify the limitations to each DOE owned, contractor operated nuclear facility based on the documented safety analysis (DSA) and any additional safety requirements established for the facility. Cancels DOE G 423.1-1.

  13. Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-03

    This Guide provides elaboration for the content of TSRs. Section 10 CFR 830.205 of the Nuclear Safety Management rule, requires Department of Energy (DOE) contractors responsible for category 1, 2, and 3 DOE nuclear facilities to develop Technical Safety Requirements (TSRs). These TSRs identify the limitations to each DOE owned, contractor operated nuclear facility based on the documented safety analysis (DSA) and any additional safety requirements established for the facility. Does not cancel other directives.

  14. Hanford Tanks Initiative requirements and document management process guide

    SciTech Connect (OSTI)

    Schaus, P.S.

    1998-05-22

    This revision of the guide provides updated references to project management level Program Management and Assessment Configuration Management activities, and provides working level directions for submitting requirements and project documentation related to the Hanford Tanks Initiative (HTI) project. This includes documents and information created by HTI, as well as non-HTI generated materials submitted to the project.

  15. Acquisition Guide Chapter 6.1 – Competition Requirements

    Broader source: Energy.gov [DOE]

    Acquisition Guide Chapter 6.1 – Competition Requirements is revised to provide guidance on how to prepare and present a determination for an exception to public interest for other than full and open competition FAR 6.302-7 when no other authorities in FAR 6.302 apply. Sample pages are in the STRIPES Library. Vertical lines on pages 2, 4, 5, 10, 11 and 12 in the right margin show where the changes are in the chapter.

  16. ALS beamline design requirements: A guide for beamline designers

    SciTech Connect (OSTI)

    1996-06-01

    This manual is written as a guide for researchers in designing beamlines and endstations acceptable for use at the ALS. It contains guidelines and policies related to personnel safety and equipment and vacuum protection. All equipment and procedures must ultimately satisfy the safety requirements set aside in the Lawrence Berkeley National Laboratory (LBNL) Health and Safety Manual (PUB-3000) which is available from the ALS User Office or on the World WideWeb from the LBNL Homepage (http:// www.lbl.gov).

  17. Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Season Reform Customer Meeting September 20, 2012 Agenda NOS Preliminary Future State Model Financial Requirements Financial Analysis for NOS Reform: CIFA Assumptions Eligibility...

  18. Risk Management Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7A, Risk Management Guide by John Makepeace Functional areas: Risk Management, Safety and Security This Guide provides non-mandatory risk management approaches for implementing the...

  19. Cost Estimating Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, Cost Estimating Guide by Ruben Sanchez Functional areas: Budget and Financial Management, Financial Management This Guide provides uniform guidance and best practices that...

  20. Meeting PMU Data Quality Requirements for Mission Critical Applications

    Energy Savers [EERE]

    Meeting PMU Data Quality Requirements for Mission Critical Applications Anurag Srivastava School of Electrical Engineering and Computer Science Washington State University asrivast@eecs.wsu.edu PSERC Public Webinar Tuesday, November 17, 2015 2:00-3:00 p.m. Eastern Time (11:00-12:00 p.m. Pacific) If you plan to use the phone bridge, use the NEW number: 877-820-7831 (passcode: 965722#). Description: Phasor Measurement Units (PMU's) provide synchronized measurements at high rates for wide area

  1. DOE G 423.1-1B, Implementation Guide for Use in Developing Technical Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This Guide provides a complete description of what Technical Safety Requirements should contain and how they should be developed and maintained. This revision of the guide provides new guidance on Technical Safety Requirements for Specific Administrative Controls, incorporates and addresses lessons learned, and makes clarifications and organization changes to improve usability.

  2. Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-24

    This Guide provides information to assist in the implementation and interpretation of Title 10 Code of Federal Regulations (CFR) Part 830.203, Unreviewed Safety Question Process, of the Nuclear Safety Management Rules for applicable nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Canceled by DOE N 251.93.

  3. Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-07-24

    This Guide provides information to assist in implementation of Title 10 Code of Federal Regulations Part 830.203, "Unreviewed Safety Question Process," of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy, including the National Nuclear Security Administration. Cancels DOE G 424.1-1.

  4. Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-08

    This Guide, including its attachments, provides information to assist in the implementation of Title 10 Code of Federal Regulations (CFR) Section 830.203, “Unreviewed Safety Question Process,” of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Admin Chg 2, dated 6-12-13, supersedes DOE G 424.1-1B Admin Chg 1.

  5. Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-08

    This Guide, including its attachments, provides information to assist in the implementation of Title 10 Code of Federal Regulations (CFR) Section 830.203, Unreviewed Safety Question Process, of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Cancels DOE G 424.1-1A. Admin Chg 1 dated 4-12-13.

  6. Implementation Guide for Use in Developing Technical Safety Requirements--Withdrawn

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-06-21

    As part of the one-year accuracy review of the November 2010 change to the Guide, as required by DOE O 251.1C, Departmental Directives Program, Section 7, additional changes to the Guide were identified by the program offices to make it more complete and effective. Withdrawn 4-10-14.

  7. Hydrogen Storage Materials Requirements to Meet the 2017 On Board...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Chemical Hydrogen Storage System 9 10 HSECoE Chemical ... for Projected System Design 12 Required system ... Stage 1 - Optimal Isotherm Parameters * Optimization of ...

  8. Fact #658: January 17, 2011 Increasing Use of Vehicle Technologies to Meet Fuel Economy Requirements

    Broader source: Energy.gov [DOE]

    Vehicle manufacturers are turning to vehicle technologies to improve efficiency and meet strict fuel economy requirements. Over the last 10 years, the use of engine technologies like multi-valves...

  9. Westinghouse VANTAGE+ fuel assembly to meet future PWR operating requirements

    SciTech Connect (OSTI)

    Doshi, P.K.; Chapin, D.L.; Scherpereel, L.R.

    1988-01-01

    Many utilities operating pressurized water reactors (PWRs) are implementing longer reload cycles. Westinghouse is addressing this trend with fuel products that increase fuel utilization through higher discharge burnups. Higher burnup helps to offset added enriched uranium costs necessary to enable the higher energy output of longer cycles. Current fuel products have burnup capabilities in the area of 40,000 MWd/tonne U or more. There are three main phenomena that must be addressed to achieve even higher burnup levels: accelerated cladding, waterside corrosion, and hydriding; increased fission gas production; and fuel rod growth. Long cycle lengths also require efficient burnable absorbers to control the excess reactivity associated with increased fuel enrichment while maintaining a low residual absorber penalty at the end of cycle. Westinghouse VANTAGE + PWR fuel incorporates features intended to enhance fuel performance at very high burnups, including advances in the three basic elements of the fuel assembly: fuel cladding, fuel rod, and fuel assembly skeleton. ZIRLO {sup TM} cladding, an advanced Zircaloy cladding that contains niobium, offers a significant improvement in corrosion resistance relative to Zircaloy-4. Another important Westinghouse PWR fuel feature that facilitates long cycles is the zirconium diboride integral fuel burnable absorber (ZrB{sub 2}IFBA).

  10. NNMCAB Meeting Procedure | Department of Energy

    Office of Environmental Management (EM)

    Meeting Procedure NNMCAB Meeting Procedure A quick guide to the parliamentary procedure used by the NNMCAB during full Board Meetings. PDF icon NNMCAB Meeting Procedure Guide

  11. ACQUISITION GUIDE CHAPTER 42.101: AUDIT REQUIREMENTS FOR NON-MANAGEMENT AND OPERATING CONTRACTS

    Broader source: Energy.gov [DOE]

    A new chapter (42.101) has been added to the Acquisition Guide. It addresses how the Contracting Officer should view the vital, sometimes required by regulation, sometimes required by Department policy, and sometimes dictated by prudence, role of auditors in: source selection in cost-reimbursement contacting; pricing actions for all contract types; and ensuring the Government is reimbursing only costs that are allocable, allowable, and reasonable during cost-reimbursement contract performance.

  12. Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commercial Business Process Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Meetings Customer Comments Network Integration...

  13. Network as Discovery Instrument: A Quick-Start Guide (2013 DOE JGI Genomics of Energy and Environment 8th Annual User Meeting)

    SciTech Connect (OSTI)

    Bell, Gregory [Berkeley Lab

    2013-03-01

    Gregory Bell of Berkeley Lab on "Network as discovery instrument: a Quick-Start Guide" at the 8th Annual Genomics of Energy & Environment Meeting in Walnut Creek, Calif.

  14. Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Meetings Customer Comments Attachment K Commercial Business Process...

  15. Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is available on the BPA Event Calendar. 2013 Network Open Season Update 2013 NOS Cluster Study Meeting May 20, 2014 Agenda Cluster Study Results Overview Generation...

  16. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    SciTech Connect (OSTI)

    ROOT, R.W.

    1999-05-18

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.

  17. Technical Meeting: Reference Guide for a Transaction-Based Building Controls Framework

    Broader source: Energy.gov [DOE]

    BTO held a technical meeting at NREL, in Golden, CO, to discuss BTO's vision for a transaction-rich buildings energy ecosystem that will unlock the energy efficiency and grid services values and deliver them to consumers. View the presentations and meeting notes.

  18. GUIDED TOUR—CONNECTED LIGHTING SYSTEMS MEETING AND TECHNOLOGY DEVELOPMENT WORKSHOP

    Broader source: Energy.gov [DOE]

    The guided bus tour will provide a first-hand look at an LED connected lighting system installed in an office space in the 911 Federal Building. This eight-story building constructed in the 1950s...

  19. Proposal for a Guide for Quality Management Systems for PV Manufacturing: Supplemental Requirements to ISO 9001-2008 (Revised)

    SciTech Connect (OSTI)

    Norum, P.; Sinicco, I.; Eguchi, Y.; Lokanath, S.; Zhou, W.; Brueggemann, G.; Mikonowicz, A.; Yamamichi, M.; Kurtz, S.

    2013-09-01

    This technical specification provides a guideline for photovoltaic module manufacturers to produce modules that, once the design has proven to meet the quality and reliability requirements, replicate such design in an industrial scale without compromising its consistency with the requirements.

  20. Accelerator Facility Safety Implementation Guide for DOE Order 420.2C, Safety of Accelerator Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-08-30

    This is a guide to understanding and meeting the requirements of DOE Order 420.2C and shares lessons learned based on valuable experience within the community.

  1. Using Electric Vehicles to Meet Balancing Requirements Associated with Wind Power

    SciTech Connect (OSTI)

    Tuffner, Francis K.; Kintner-Meyer, Michael CW

    2011-07-31

    Many states are deploying renewable generation sources at a significant rate to meet renewable portfolio standards. As part of this drive to meet renewable generation levels, significant additions of wind generation are planned. Due to the highly variable nature of wind generation, significant energy imbalances on the power system can be created and need to be handled. This report examines the impact on the Northwest Power Pool (NWPP) region for a 2019 expected wind scenario. One method for mitigating these imbalances is to utilize plug-in hybrid electric vehicles (PHEVs) or battery electric vehicles (BEVs) as assets to the grid. PHEVs and BEVs have the potential to meet this demand through both charging and discharging strategies. This report explores the usage of two different charging schemes: V2GHalf and V2GFull. In V2GHalf, PHEV/BEV charging is varied to absorb the additional imbalance from the wind generation, but never feeds power back into the grid. This scenario is highly desirable to automotive manufacturers, who harbor great concerns about battery warranty if vehicle-to-grid discharging is allowed. The second strategy, V2GFull, varies not only the charging of the vehicle battery, but also can vary the discharging of the battery back into the power grid. This scenario is currently less desirable to automotive manufacturers, but provides an additional resource benefit to PHEV/BEVs in meeting the additional imbalance imposed by wind. Key findings in the report relate to the PHEV/BEV population required to meet the additional imbalance when comparing V2GHalf to V2GFull populations, and when comparing home-only-charging and work-and-home-charging scenarios. Utilizing V2GFull strategies over V2GHalf resulted in a nearly 33% reduction in the number of vehicles required. This reduction indicates fewer vehicles are needed to meet the unhandled energy, but they would utilize discharging of the vehicle battery into the grid. This practice currently results in the voiding of automotive manufacturer's battery warranty, and is not feasible for many customers. The second key finding is the change in the required population when PHEV/BEV charging is available at both home and work. Allowing 10% of the vehicle population access to work charging resulted in nearly 80% of the grid benefit. Home-only charging requires, at best, 94% of the current NWPP light duty vehicle fleet to be a PHEV or BEV. With the introduction of full work charging availability, only 8% of the NWPP light duty vehicle fleet is required. Work charging has primarily been associated with mitigating range anxiety in new electric vehicle owners, but these studies indicate they have significant potential for improving grid reliability. The V2GHalf and V2GFull charging strategies of the report utilize grid frequency as an indication of the imbalance requirements. The introduction of public charging stations, as well as the potential for PHEV/BEVs to be used as a resource for renewable generation integration, creates conditions for additional products into the ancillary services market. In the United Kingdom, such a capability would be bid as a frequency product in the ancillary services market. Such a market could create the need for larger, third-party aggregators or services to manage the use of electric vehicles as a grid resource. Ultimately, customer adoption, usage patterns and habits, and feedback from the power and automotive industries will drive the need.

  2. Cost guide. Volume 2. Standard procedures for determining revenue requirements (product cost)

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    The DOE has conducted economic analyses of alternative energy projects over the past several years which compared emerging technologies to conventional technologies and also to competing emerging technologies. The method used was to determine and compare the product costs of the technologies being assessed. A review of the application of this product cost technique over the past few years revealed that slightly different financial assumptions, economic factors, and scope were used. Therefore, it is not meaningful to compare results. Consistent comparison of the economic benefits of programs and projects being evaluated by DOE is essential to accomplish the assigned missions and functions. The process of reviewing much of the work accomplished by DOE and its support contractors failed to disclose a single source document or methodology which had potential application across the full range of DOE interests. However, the 1981 version of the Technical Assessment Guide published by the Electric Power Research Institute (EPRI) appears to have all of the necessary elements, economic factors, assumptions, and cost performance information necessary to meet the DOE's needs. A review of the document indicates that the methodology described by EPRI can be applied to almost any energy project so long as appropriate business and financial assumptions are made.The financial and business assumptions presented in EPRI technical report P-2410-SR are typical of the electric utility industry. Moreover, using a methodology already widely accepted by the utility industry, DOE can help reduce proliferation of different methods and promote the adoption of a standard. This guide presents a summary of the methodology, data on fuel price projections, and cost and performance information for transmission and generation technologies, and reflects an explanation of the economic methodology to include sample problems.

  3. Implementation Guide for Use in Developing Documented Safety Analyses to Meet Subpart B of 10 CFR 830

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-24

    This Guide elaborates on the documented safety analysis (DSA) development process and the safe harbor provisions of the Appendix to10 CFR 830 Subpart B. Title 10 Code of Federal Regulations (CFR) Part 830, Subpart B, 'Safety Basis Requirements,' requires the contractor responsible for a Department of Energy (DOE) nuclear facility to analyze the facility, the work to be performed, and the associated hazards and to identify the conditions, safe boundaries, and hazard controls necessary to protect workers, the public, and the environment from adverse consequences. Canceled by DOE G 421.1-2A

  4. Qualification Requirements of Guided Ultrasonic Waves for Inspection of Piping in Light Water Reactors

    SciTech Connect (OSTI)

    Meyer, Ryan M.; Ramuhalli, Pradeep; Doctor, Steven R.; Bond, Leonard J.

    2013-08-01

    Guided ultrasonic waves (GUW) are being increasingly used for both NDT and monitoring of piping. GUW offers advantages over many conventional NDE technologies due to the ability to inspect large volumes of piping components without significant removal of thermal insulation or protective layers. In addition, regions rendered inaccessible to more conventional NDE technologies may be more accessible using GUW techniques. For these reasons, utilities are increasingly considering the use of GUWs for performing the inspection of piping components in nuclear power plants. GUW is a rapidly evolving technology and its usage for inspection of nuclear power plant components requires refinement and qualification to ensure it is able to achieve consistent and acceptable levels of performance. This paper will discuss potential requirements for qualification of GUW techniques for the inspection of piping components in light water reactors (LWRs). The Nuclear Regulatory Commission has adopted ASME Boiler and Pressure Vessel Code requirements in Sections V, III, and XI for nondestructive examination methods, fabrication inspections, and pre-service and in-service inspections. A Section V working group has been formed to place the methodology of GUW into the ASME Boiler and Pressure Vessel Code but no requirements for technique, equipment, or personnel exist in the Code at this time.

  5. Worker Protection Management for DOE Federal and Contractor Employees Guide for use with DOE O 440.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-07-10

    This implementation guide provides general information and methodologies that DOE finds acceptable in meeting the Department's requirements defined in DOE O 440.1.

  6. Part-load cogeneration technology meets chilled water and steam requirements

    SciTech Connect (OSTI)

    Leach, M.D.

    1998-10-01

    Louisiana State University`s Energy Savings Performance Contract with CES/Way was a groundbreaking project that applied part-load cogeneration technology to a large university campus to meet chilled water and steam requirements for expansion needs. Simultaneously, the project provided these utilities at no additional out of pocket cost to the institution by using the innovative financing mechanism of performance contracting, in which project savings pay for the investment. In addition, the work is performed via a cogeneration system operating most of the year at part-load. This mechanical cogeneration project could also be termed a thermal cogeneration project, as it provides a dual thermal benefit from a single input energy source. Not only did the project achieve the projected energy savings, but the savings proved to be so dependable that the University opted for an early buyout of the project from CES/Way in 1994, after only about two years of documented savings.

  7. Updated Proposal for a Guide for Quality Management Systems for PV Manufacturing. Supplemental Requirements to ISO 9001-2008

    SciTech Connect (OSTI)

    Ramu, Govind; Yamamichi, Masaaki; Zhou, Wei; Mikonowicz, Alex; Lokanath, Sumanth; Eguchi, Yoshihito; Norum, Paul; Kurtz, Sarah

    2015-03-01

    The goal of this Technical Specification is to provide a guideline for manufacturers of photovoltaic (PV) modules to produce modules that, once the design is proven to meet the quality and reliability requirements, replicate the design on an industrial scale without compromising its consistency with the requirements.

  8. CHART SUPPLEMENT TO ACQUISTION GUIDE CHAPTER 42.101, AUDIT REQUIREMENTS FOR NON-MANAGEMENT AND OPERATING CONTRACTS

    Broader source: Energy.gov [DOE]

    The attached chart supplements the guidance in Acquisition Guide Chapter 42.101, Audit Requirements for Non-Management and Operating Contracts. The chart presents the audit services requirements discussed in Acquisition Guide Chapter 42.101 in a series of tables arranged by contract type. The order of the tables follows the order used in the Subparts of FAR Part 16—TYPES OF CONTRACTS, which is: Fixed-Price, Cost-Reimbursement, Incentive, Indefinite-Delivery, Time-and-Materials, and Labor-Hour Contracts. Each table provides when the requirement arises (pre-award or post-award), how often, what the requirement is, and the source of the requirement (FAR, DEAR, or DOE Policy), including specific references.

  9. Guide Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE G XXX.X-X xx-xx-20XX Guide Title [This Guide describes acceptable, but not mandatory means for complying with requirements. Guides are not requirements documents and are not to be construed as requirements in any audit or appraisal for compliance with associated rule or directives.] U.S. Department of Energy Office of Primary Interest FOREWORD (optional) THE FOREWORD SHOULD DESCRIBE THE DOE REQUIREMENTS, DIRECTIVES, OR RULES THAT MAY BE SATISFIED BY IMPLEMENTING THIS GUIDE. CONTENTS

  10. EVALUATION OF SUPPLEMENTAL PRE-TREATMENT DEVELOPMENT REQUIREMENTS TO MEET TRL 6 ROTARY MICROFILTRATION

    SciTech Connect (OSTI)

    HUBER HJ

    2011-10-03

    In spring 2011, the Technology Maturation Plan (TMP) for the Supplemental Treatment Project (RPP-PLAN-49827, Rev. 0), Technology Maturation Plan for the Treatment Project (T4S01) was developed. This plan contains all identified actions required to reach technical maturity for a field-deployable waste feed pretreatment system. The supplemental pretreatment system has a filtration and a Cs-removal component. Subsequent to issuance of the TMP, rotary microfiltration (RMF) has been identified as the prime filtration technology for this application. The prime Cs-removal technology is small column ion exchange (ScIX) using spherical resorcinol formaldehyde (sRF) as the exchange resin. During fiscal year 2011 (FY2011) some of the tasks identified in the TMP have been completed. As of September 2011, the conceptual design package has been submitted to DOE as part of the critical decision (CD-1) process. This document describes the remaining tasks identified in the TMP to reach technical maturity and evaluates the validity of the proposed tests to fill the gaps as previously identified in the TMP. The potential vulnerabilities are presented and the completed list of criteria for the DOE guide DOE G 413.3-4 different technology readiness levels are added in an attachment. This evaluation has been conducted from a technology development perspective - all programmatic and manufacturing aspects were excluded from this exercise. Compliance with the DOE G 413.3-4 programmatic and manufacturing requirements will be addressed directly by the Treatment Project during the course of engineering design. The results of this evaluation show that completion of the proposed development tasks in the TMP are sufficient to reach TRL 6 from a technological point of view. The tasks involve actual waste tests using the current baseline configuration (2nd generation disks, 40 psi differential pressure, 30 C feed temperature) and three different simulants - the PEP, an AP-Farm and an S-saltcake. Based on FY2011 dollars used in the TMP, these tests will have ROM costs of $950K and require up to 10 months to complete. Completion of the simulant testing will satisfy the TRL 5 and TRL 6 criteria that are related to system testing with materials that represent the full range of properties in a relevant environment.

  11. Guidance on meeting DOE order requirements for traceable nondestructive assay measurements

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    Purpose of this guide is to facilitate accuracy and precision of nondestructive assay measurements through improvement of the materials and process of traceability. This document provides DOE and its contractor facilities with guidance to establish traceability to the national measurement base for site-prepared NDA working reference materials.

  12. Notice of Intent to Revise Department of Energy Guide 424.1-1B, Implementation Guide for Use in Addressing Unreviewed Safety Questions Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-08-06

    The Office of Environment, Health, Safety and Security (AU) is proposing to perform a full revision of DOE Guide 424.1-1B to incorporate lessons learned identified by DOE Program Offices since the Guide's last full revision in 2006. In 2010 a limited revision to the Guide was conducted to incorporate a clarification on use of evaluation of the safety of the situation and consolidation of the potentially inadequate analysis process within the Guide.

  13. Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-17

    This Guide provides acceptable methods for implementing the safety software quality assurance requirements of draft DOE O 414.1C, Quality Assurance. Certified 11-3-10. No cancellation.

  14. Acquisition Guide Chapters 4.1- Procurement and Assistance Data System (PADS) and 4.3- Requirements for the Industry Interactive Procurement System (IIPS)

    Broader source: Energy.gov [DOE]

    With the implementation of Strategic Integrated Procurement Enterprise System (STRIPES), Acquisition Guide Chapters 4.1 - Procurement and Assistance Data System (PADS) and 4.3 - Requirements for the Industry Interactive Procurement System (IIPS) are hereby rescinded.

  15. Hydrogen Storage Materials Requirements to Meet the 2017 On Board Hydrogen Storage Technical Targets

    Broader source: Energy.gov [DOE]

    Presentation slides from the Hydrogen Storage Materials Requirements webinar presented by the US Department of Energy Fuel Cell Technologies Office on June 25, 2013.

  16. Publications desktop survival guide

    SciTech Connect (OSTI)

    1995-06-01

    Purpose of this guide is to document and simplify the writing, reviewing, and production process for the Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) staff and to provide specific answers concerning the content, style, and format of UMTRA Project documents. Goal of the UMTRA Project document preparation process is to deliver to the US DOE high-quality documents that meet requirements (meets expressed client needs; accurate and consistent technical content; clear writing; well organized document; consistent style). A document review process has been established to ensure that TAC documents are accurate, consistent, and well organized. The editing process applies standard rules for style and format, spelling, grammar, punctuation, and sentence structure to make the document consistent and easier to read. This guide sets forth the rules to be applied to UMTRA Project documents.

  17. Meeting Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HEP Meeting Materials Meeting Materials Here you will find various items to be used before and during the requirements review. The following documents are included: Case study worksheet to be filled in by meeting participants Sample of a completed case study from a Nuclear Physics requirements workshop held in 2011 A graph of NERSC and HEP usage as a function of time A powerpoint template you can use at the requirements review Downloads CaseStudyTemplate.docx | unknown Case Study Worksheet -

  18. Return on investment (ROI) proposal preparation guide

    SciTech Connect (OSTI)

    VALERO, O.J.

    1998-10-09

    The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding.

  19. SU-E-P-03: Implementing a Low Dose Lung Screening CT Program Meeting Regulatory Requirements

    SciTech Connect (OSTI)

    LaFrance, M; Marsh, S; O'Donnell, G

    2014-06-01

    Purpose: To provide information pertaining to IROC Houston QA Center's (RPC) credentialing process for institutions participating in NCI-sponsored clinical trials. Purpose: Provide guidance to the Radiology Departments with the intent of implementing a Low Dose CT Screening Program using different CT Scanners with multiple techniques within the framework of the required state regulations. Method: State Requirements for the purpose of implementing a Low Dose CT Lung Protocol required working with the Radiology and Pulmonary Department in setting up a Low Dose Screening Protocol designed to reduce the radiation burden to the patients enrolled. Radiation dose measurements (CTDIvol) for various CT manufacturers (Siemens16, Siemens 64, Philips 64, and Neusoft128) for three different weight based protocols. All scans were reviewed by the Radiologist. Prior to starting a low dose lung screening protocol, information had to be submitted to the state for approval. Performing a Healing Arts protocol requires extensive information. This not only includes name and address of the applicant but a detailed description of the disease, the x-ray examination and the population to be examined. The unit had to be tested by a qualified expert using the technique charts. The credentials of all the operators, the supervisors and the Radiologists had to be submitted to the state. Results: All the appropriate documentation was sent to the state for review. The measured results between the Low Dose Protocol versus the default Adult Chest Protocol showed that there was a dose reduction of 65% for small (100-150 lb.) patient, 75% for the Medium patient (151-250 lbs.), and a 55% reduction for the Large patient ( over 250 lbs.). Conclusion: Measured results indicated that the Low Dose Protocol indeed lowered the screening patient's radiation dose and the institution was able to submit the protocol to the State's regulators.

  20. Baseload gas turbine to meet utility requirements for reliability and availability

    SciTech Connect (OSTI)

    Grevstad, P.E.; Smith, M.J.; Duncan, R.L.

    1982-04-01

    The coal gasifier-gas turbine, combined cycle is described as a superior baseload electric generating system. It promises lower fuel cost, lower operating and maintenance cost, and superior siting and environmental characteristics over conventional steam systems with flue gas clean up and fluidized bed combined cycle systems. Two major new components are required: 1) the coal gasifier, and 2) the baseload gas turbine. 10 refs.

  1. Meeting Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    be used before and during the requirements review. The following documents are included: Case study worksheet to be filled in by meeting participants Sample of a completed case...

  2. Meeting Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    before and during the requirements review. The following documents are included: Case study worksheet to be filled in by meeting participants Sample of a completed case study...

  3. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-05

    This Guide describes a maintenance management program that would be acceptable to DOE for meeting the requirements of DOE O 433.1. Canceled by DOE G 433.1-1A.

  4. Accelerator Facility Safety Implementation Guide for DOE O 420.2C, Safety of Accelerator Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-08-01

    This document is a guide to understanding and meeting the requirements of DOE O 420.2C, and shares lessons learned based on valuable experience within the community. Supersedes DOE G 420.2-1.

  5. Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-18

    This Guide provides background information, an overview of the integration process, and guidance relating to the preliminary steps that DOE sites should undertake to meet the requirements of DOE O 450.1.

  6. Suspect/Counterfeit Items Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1B, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-11-03

    This Guide provides guidance to assist DOE/NNSA and its contractors in mitigating the safety threat of suspect/counterfeit items (S/CIs). Cancels DOE G 440.1-6, Implementation Guide for use with Suspect/Counterfeit Items Requirements of DOE O 440.1, Worker Protection Management; 10 CFR 830.120; and DOE O 5700.6C, Quality Assurance, dated 6-30-97. Canceled by DOE G 414.1-2B.

  7. Relative Economic Merits of Storage and Combustion Turbines for Meeting Peak Capacity Requirements under Increased Penetration of Solar Photovoltaics

    SciTech Connect (OSTI)

    Denholm, Paul; Diakov, Victor; Margolis, Robert

    2015-09-01

    Batteries with several hours of capacity provide an alternative to combustion turbines for meeting peak capacity requirements. Even when compared to state-of-the-art highly flexible combustion turbines, batteries can provide a greater operational value, which is reflected in a lower system-wide production cost. By shifting load and providing operating reserves, batteries can reduce the cost of operating the power system to a traditional electric utility. This added value means that, depending on battery life, batteries can have a higher cost than a combustion turbine of equal capacity and still produce a system with equal or lower overall life-cycle cost. For a utility considering investing in new capacity, the cost premium for batteries is highly sensitive to a variety of factors, including lifetime, natural gas costs, PV penetration, and grid generation mix. In addition, as PV penetration increases, the net electricity demand profile changes, which may reduce the amount of battery energy capacity needed to reliably meet peak demand.

  8. Implementation Guide for DOE Fire Protection and Emergency Services Programs for Use with DOE O 420.1B, Facility Safety

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-09-27

    This Guide facilitates the implementation of requirements of DOE O 420.1B by providing an acceptable approach to meet the requirements for Fire Protection Programs. Cancels DOE G 440.1-5.

  9. Revenue Requirements Modeling System (RRMS) documentation. Volume I. Methodology description and user's guide. Appendix A: model abstract; Appendix B: technical appendix; Appendix C: sample input and output. [Compustat

    SciTech Connect (OSTI)

    Not Available

    1986-03-01

    The Revenue Requirements Modeling System (RRMS) is a utility specific financial modeling system used by the Energy Information Administration (EIA) to evaluate the impact on electric utilities of changes in the regulatory, economic, and tax environments. Included in the RRMS is a power plant life-cycle revenue requirements model designed to assess the comparative economic advantage of alternative generating plant. This report is Volume I of a 2-volume set and provides a methodology description and user's guide, a model abstract and technical appendix, and sample input and output for the models. Volume II provides an operator's manual and a program maintenance guide.

  10. Sequencing, Finishing and Analysis in the Future Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Meeting Meeting Materials Meeting Guide (pdf) Keynote speakers were Rick Wilson, Ph.D., Director of The Genome Institute at Washington University, and Professor of Genetics ...

  11. Implementation Guide for Use in Developing Documented Safety Analyses to Meet Subpart B of 10 CFR 830

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-12-19

    Title 10 Code of Federal Regulations (CFR) Part 830, Subpart B, Safety Basis Requirements, requires the contractor responsible for a Department of Energy (DOE) nuclear facility to analyze the facility, the work to be performed, and the associated hazards and to identify the conditions, safe boundaries, and hazard controls necessary to protect workers, the public, and the environment from adverse consequences. Supersedes DOE G 421.1-2.

  12. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Guide ------------------------ Chapter 71.1 (Dec 2014) HEADQUARTERS BUSINESS CLEARANCE PROCESS Guiding Principles  Timely acquisition planning is critical  Effective oversight control systems are essential to ensuring the high quality/integrity of procurement transactions  Collaboration and cooperation are required for timely, effective procurement processes Overview This chapter provides guidance regarding the policies and procedures governing the Field Assistance and

  13. Revenue Requirements Modeling System (RRMS) documentation. Volume II. Appendix D: operator's manual; Appendix E: program maintenance guide. Final report. [COMPUSTAT II

    SciTech Connect (OSTI)

    Not Available

    1986-03-01

    The Revenue Requirements Modeling System (RRMS) is a utility specific financial modeling System used by the Energy Information Administration (EIA) to evaluate the impact on electric utilities of changes in the regulatory, economic and tax environments. Included in the RRMS is a power plant life-cycle revenue requirements model designed to assess the comparative economic advantage of alternative generating plant. This report is Volume II of a 2 volume set and provides a programmer's guide which describes new user initialization procedures and data base update procedures. This report also provides a software maintenance guide which contains listings of all computer code for the models. Volume I provides a methodology description and user's guide, a model abstract and technical appendix, and sample input and output for the models.

  14. Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-17

    This Guide provides information on principles and practices used to establish and implement an effective quality assurance program or quality management system in accordance with the requirements of 10 CFR 830. Cancels DOE G 414.1-2. Canceled by DOE G 414.1-2B.

  15. Improved System Performance and Reduced Cost of a Fuel Reformer, LNT, and SCR Aftertreatment System Meeting Emissions Useful Life Requirement

    Broader source: Energy.gov [DOE]

    An advanced exhaust aftertreatment system developed to meet EPA 2010 and final Tier 4 emission regulations show substantial improvements in system performance while reducing system cost

  16. The Cost-Effectiveness of Investments to Meet the Guiding Principles for High-Performance Sustainable Buildings on the PNNL Campus

    SciTech Connect (OSTI)

    Cort, Katherine A.; Judd, Kathleen S.

    2014-08-29

    As part its campus sustainability efforts, Pacific Northwest National Laboratory (PNNL) has invested in eight new and existing buildings to ensure they meet the U.S. Department of Energy’s requirements for high performance sustainable buildings (HPSB) at DOE sites. These investments are expected to benefit PNNL by reducing the total life-cycle cost of facilities, improving energy efficiency and water conservation, and making buildings safer and healthier for the occupants. This study examines the cost-effectiveness of the implementing measures that meet the criteria for HPSBs in 3 different types of buildings on the PNNL campus: offices, scientific laboratories, and data centers. In each of the three case studies examined the investments made to achieve HPSB status demonstrated a high return on the HPSB investments that have taken place in these varied environments. Simple paybacks for total investments in the three case study buildings ranged from just 2 to 5 years; savings-to-investment ratios all exceeded the desirable threshold of 1; and the net present values associated with these investments were all positive.

  17. Construction Kickoff Meeting Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction Kickoff Meeting Agenda Construction Kickoff Meeting Agenda Document serves as a standard agenda for the construction kickoff meeting. File Download the Construction Kickoff Meeting Agenda. More Documents & Publications Investment-Grade Audit Kickoff Meeting Sample Agenda Agenda: Preliminary Assessment Kickoff Meeting FEMP ESPC Project Development Resource Guide

  18. Guide to good practices for operations aspects of unique processes

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Aspects of Facility Chemistry and Unique Process, Chapter 13 of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities.`` The practices in this guide should be considered when planning or reviewing employee training and facility management programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19.

  19. User Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Guide User Guide Print 1. Register with the ALS Create an account on ALSHub-the ALS user portal. 2. Apply for Beam Time 3. Establish a User Agreement 4. Comply with Experiment Safety Requirements Upon receiving beam time, complete an Experiment Safety Sheet. 5. Get Access to Work Onsite 6. Complete Online Safety Training 7. Utilize Available Resources 8. Complete the User Satisfaction Survey 9. Report Publications, Awards, Talks, Acknowledging Work at ALS

  20. User Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Guide User Guide Print Wednesday, 16 September 2009 08:53 1. Register with the ALS Create an account on ALSHub-the ALS user portal. 2. Apply for Beam Time 3. Establish a User Agreement 4. Comply with Experiment Safety Requirements Upon receiving beam time, complete an Experiment Safety Sheet. 5. Get Access to Work Onsite 6. Complete Online Safety Training 7. Utilize Available Resources 8. Complete the User Satisfaction Survey 9. Report Publications, Awards, Talks, Acknowledging Work at ALS

  1. Committee Report for December 18, 2013 Meeting | Department of Energy

    Energy Savers [EERE]

    Guidance for ESPCs Commissioning Guidance for ESPCs Document provides a description of how commissioning in energy savings performance contract (ESPC) projects can achieve the objective of meeting or exceeding facility performance requirements by optimizing the operation and efficiency of building systems and equipment. PDF icon ph3_cx_guide_23.pdf More Documents & Publications Investment-Grade Audit Kickoff Meeting Sample Agenda FEMP Comprehensive ESPC Workshop Presentations Using ENABLE in

  2. Guide to FEMP-Designated Parking Structure Lighting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Structure Lighting Guide to FEMP-Designated Parking Structure Lighting Document provides acquisition guidance and federal efficiency requirements across a variety of product cate-gories, including parking garage luminaires, which are a FEMP-designated product category. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. PDF icon parking_structure_lighting_guide.pdf More

  3. Guidelines for generators to meet HWHF acceptance requirements for hazardous, radioactive, and mixed wastes at Berkeley Lab. Revision 3

    SciTech Connect (OSTI)

    Albert, R.

    1996-06-01

    This document provides performance standards that one, as a generator of hazardous chemical, radioactive, or mixed wastes at the Berkeley Lab, must meet to manage their waste to protect Berkeley Lab staff and the environment, comply with waste regulations and ensure the continued safe operation of the workplace, have the waste transferred to the correct Waste Handling Facility, and enable the Environment, Health and Safety (EH and S) Division to properly pick up, manage, and ultimately send the waste off site for recycling, treatment, or disposal. If one uses and generates any of these wastes, one must establish a Satellite Accumulation Area and follow the guidelines in the appropriate section of this document. Topics include minimization of wastes, characterization of the wastes, containers, segregation, labeling, empty containers, and spill cleanup and reporting.

  4. Change Control Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-29

    The Guide provides a suggested approach and uniform guidance for managing project and contract changes through applying the requirements of DOE O 413.3B. No cancellation.

  5. Sponsoring, Mentoring and Guiding Cultural Diverse Young Scientists...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sponsoring, Mentoring and Guiding Cultural Diverse Young Scientists and Engineers Presentation on successful mentoring. PDF icon Partnership meeting presentation 020711...

  6. Quick Guide: Renewable Energy Certificates (RECs)

    SciTech Connect (OSTI)

    2011-07-18

    Guide for Federal agencies considering renewable energy certificate (REC) purchases to fulfill Federal renewable energy requirements.

  7. Guide to Federal Regulation of Sales of Imported Electricity in Canada, Mexico and the United States - English Version

    Energy Savers [EERE]

    Lot Lighting Guide to FEMP-Designated Parking Lot Lighting Document provides acquisition guidance and federal efficiency requirements across a variety of product categories, including outdoor pole-arm-mounted area and roadway luminaires, which are a FEMP-designated product category. Federal laws and executive orders mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law. PDF icon parking_lots_guide.pdf More

  8. Video Requirements

    Broader source: Energy.gov [DOE]

    All EERE videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the DOE YouTube channel.

  9. User Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Guide Print 1. Register with the ALS Create an account on ALSHub-the ALS user portal. 2. Apply for Beam Time 3. Establish a User Agreement 4. Comply with Experiment Safety Requirements Upon receiving beam time, complete an Experiment Safety Sheet. 5. Get Access to Work Onsite 6. Complete Online Safety Training 7. Utilize Available Resources 8. Complete the User Satisfaction Survey 9. Report Publications, Awards, Talks, Acknowledging Work at ALS

  10. User Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Guide Print 1. Register with the ALS Create an account on ALSHub-the ALS user portal. 2. Apply for Beam Time 3. Establish a User Agreement 4. Comply with Experiment Safety Requirements Upon receiving beam time, complete an Experiment Safety Sheet. 5. Get Access to Work Onsite 6. Complete Online Safety Training 7. Utilize Available Resources 8. Complete the User Satisfaction Survey 9. Report Publications, Awards, Talks, Acknowledging Work at ALS

  11. Focus Group Meeting (Topical Meeting)

    Broader source: Energy.gov [DOE]

    Safety Standards/10 CFR 851 Meeting agenda, summary and information package Meeting Date: July 17, 2008

  12. Agenda: Investment-Grade Audit Midpoint Review Meeting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Investment-Grade Audit Midpoint Review Meeting Agenda: Investment-Grade Audit Midpoint Review Meeting Standard agenda for investment-grade audit midpoint review meeting. File Download the Investment-Grade Audit Midpoint Review Meeting Agenda. More Documents & Publications Agenda: Preliminary Assessment Kickoff Meeting Investment-Grade Audit Kickoff Meeting Sample Agenda FEMP ESPC Project Development Resource Guide

  13. Hydrogen Equipment Certification Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... committees of ASME, SAE and ISO * Hydrogen has been used ... "approval" by the code official is required before ... or as meeting a standard. Listed - Equipment, ...

  14. Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-24

    This Guide provides background information, an overview of the integration process and guidance relating to the preliminary steps that DOE sites should undertake in order to meet the requirements of DOE O 450.1. Canceled by DOE N 251.96. Cancels DOE G 450.1-1.

  15. Sell Energy-Efficient Products: A Guide to Selling to the U.S. Government

    SciTech Connect (OSTI)

    2012-12-01

    The Federal Government spends $500 billion on goods and services every year and $20 billion on energy. For many product types, the U.S. Government is the single largest purchaser. Manufacturers and vendors can increase their sales potential by helping Federal purchasers meet their energy-efficient product purchasing requirements. This guide explains how to sell products to the government.

  16. Guide to good practices for operations aspects of unique processes

    SciTech Connect (OSTI)

    1998-12-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Aspects of Facility Chemistry and Unique Processes, Chapter XIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing employee training and facility management programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Aspects of Unique Processes is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for all personnel to coordinate interrelated activities affecting unique processes.

  17. Guide to good practices for on-the-job training

    SciTech Connect (OSTI)

    1998-04-01

    Training programs at DOE facilities should prepare personnel to safely and efficiently operate and maintain the facilities in accordance with DOE requirements. This guide presents good practices for a systematic approach to on-the-job training (OJT) and OJT programs and should be used in conjunction with DOE Training Program Handbook: A Systematic Approach to Training, and with the DOE Handbook entitled Alternative Systematic Approaches to Training to develop performance-based OJT programs. DOE contractors may also use this guide to modify existing OJT programs that do not meet the systematic approach to training (SAT) objectives.

  18. Financial Assistance Guide (2013) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financial Assistance Guide (2013) Financial Assistance Guide (2013) PDF icon Financial Assistance Guide (2013).pdf More Documents & Publications Revised Guide for Financial Assistance U.S. Department of Energy - Guide to Financial Assistance - Audit Requirements for For-Profit Organizations U.S. Department of Energy Audit Guidance: For-Profit

  19. Focus Group Meeting (Topical Meeting) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Aging Workforce and Strategic Initiatives Meeting Date: November 6, 2008 Documents Available for Download PDF icon Meeting Agenda PDF icon Meeting Summary PDF icon Information Package PDF icon Illness and Injury Surveillance Program Overview PDF icon Worker Health Summary 1995 - 2004 More Documents & Publications Audit Report: WR-B-96-07 Audit Report: WR-B-05-07 OPAM Policy Acquisition Guides

  20. Focus Group Meeting (Topical Meeting)

    Broader source: Energy.gov [DOE]

    Former Worker/Energy Compensation Programs and CAIRS Reporting Meeting agenda, summary and information package Meeting Date: September 16, 2008

  1. ARM - Science Team Meeting Proceedings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govPublicationsScience Team Meeting Proceedings Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library Videos Publication Resources Submit a Publication Publishing Procedures ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications Science Team Meeting Proceedings Science Team Meeting Proceedings Note: For proper viewing, many of these proceedings should be viewed with Adobe

  2. 2010 buyer's guide

    SciTech Connect (OSTI)

    2009-12-15

    This annual buyers' guide provides a resource for identifying the companies that provide the products and services required in the power generation industry. It is divided into 3 sections, namely products, services and companies. More than 1750 suppliers mostly in the USA are listed in over 400 product categories. The Buyer's Guide is also available online at www.power-eng.com.

  3. Public Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Public Meetings Individual Permit: Public Meetings Subscribe to receive notifications for semiannual Individual Permit for Storm Water public meetings. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Public meeting notifications LANL will email a draft agenda at least one week before the meeting and will consider suggestions from the public for changes or additions to the agenda. Upcoming Meetings 2016 Meeting Archives

  4. Change Control Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-29

    The Guide provides a suggested approach and uniform guidance for managing project and contract changes through applying the requirements of DOE O 413.3B. Admin Chg 1 dated 10-22-2015.

  5. Quality Assurance Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-16

    This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Admin Chg 2, dated 5-8-13, Admin Chg 1.

  6. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-18

    This Guide provides non-mandatory risk management approaches for implementing the requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. Supersedes DOE G 413.3-7.

  7. Public Meetings: Talking Points | Department of Energy

    Energy Savers [EERE]

    Public Meetings: Talking Points Public Meetings: Talking Points Talking Points from December 2008 PDF icon Public Meetings: Talking Points More Documents & Publications ATVM Technical Support Document ATVM Loan Program Interim Final Rule (November 12, 2008) 2004 FUEL ECONOMY GUIDE BEST IN CLASS

  8. Project Completion/Closeout Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-26

    The guide provides nonmandatory approaches for implementing the requirements of DOE O 413.3B. Supersedes DOE G 413.3-16.

  9. Consent Order public meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Consent Order public meeting Consent Order public meeting WHEN: Apr 28, 2016 5:00 PM - 7:00 PM WHERE: Los Alamos County Council Chambers CATEGORY: Community TYPE: Meeting INTERNAL: Calendar Login Event Description On March 1, 2005, NMED, the Department of Energy (DOE) and the Regents of the University of California entered into the 2005 Consent Order that prescribed fence-to-fence cleanup requirements for the Laboratory. The public comment period on the Consent Order closes May 16, 2016

  10. EERE Style Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Style Guide EERE Style Guide The Office of Energy Efficiency and Renewable Energy (EERE) Style Guide is an essential tool for preparing publications, exhibits, and websites. It features formatting, spelling, punctuation, capitalization, grammar, and language guidelines. Why Use This Guide? This guide promotes the accuracy, consistency, and professionalism required for effectively communicating EERE's capabilities and accomplishments in research and development. How To Use This Guide Consult this

  11. Quick Guide: Renewable Energy Certificates (RECs) (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-07-01

    Guide for Federal agencies considering renewable energy certificate (REC) purchases to fulfill Federal renewable energy requirements.

  12. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    _____________________________________________________________ __________________________________________________Chapter 15.4-4 (December 2010) GENERAL GUIDE FOR TECHNICAL ANALYSIS OF COST PROPOSALS FOR ACQUISITION CONTRACTS Acquisition Guide _____________________________________________________________ __________________________________________________Chapter 15.4-4 (November 2010) TABLE OF CONTENT CHAPTER 1 - INTRODUCTION KEY CONCEPTS

  13. Sponsoring, Mentoring and Guiding Cultural Diverse Young Scientists and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Engineers | Argonne National Laboratory Sponsoring, Mentoring and Guiding Cultural Diverse Young Scientists and Engineers Presentation on successful mentoring. PDF icon Partnership meeting presentation 020711

  14. NEW MATERIALS DEVELOPED TO MEET REGULATORY AND TECHNICAL REQUIREMENTS ASSOCIATED WITH IN-SITU DECOMMISSIONING OF NUCLEAR REACTORS AND ASSOCIATED FACILITIES

    SciTech Connect (OSTI)

    Blankenship, J.; Langton, C.; Musall, J.; Griffin, W.

    2012-01-18

    For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and Technology, Savannah River National Laboratory's Mike Serrato reported initial information on the newly developed specialty grout materials necessary to satisfy all requirements associated with in-situ decommissioning of P-Reactor and R-Reactor at the U.S. Department of Energy's Savannah River Site. Since that report, both projects have been successfully completed and extensive test data on both fresh properties and cured properties has been gathered and analyzed for a total of almost 191,150 m{sup 3} (250,000 yd{sup 3}) of new materials placed. The focus of this paper is to describe the (1) special grout mix for filling the P-Reactor vessel (RV) and (2) the new flowable structural fill materials used to fill the below grade portions of the facilities. With a wealth of data now in hand, this paper also captures the test results and reports on the performance of these new materials. Both reactors were constructed and entered service in the early 1950s, producing weapons grade materials for the nation's defense nuclear program. R-Reactor was shut down in 1964 and the P-Reactor in 1991. In-situ decommissioning (ISD) was selected for both facilities and performed as Comprehensive Environmental Response, Compensations and Liability Act actions (an early action for P-Reactor and a removal action for R-Reactor), beginning in October 2009. The U.S. Department of Energy concept for ISD is to physically stabilize and isolate intact, structurally robust facilities that are no longer needed for their original purpose of producing (reactor facilities), processing (isotope separation facilities), or storing radioactive materials. Funding for accelerated decommissioning was provided under the American Recovery and Reinvestment Act. Decommissioning of both facilities was completed in September 2011. ISD objectives for these CERCLA actions included: (1) Prevent industrial worker exposure to radioactive or hazardous contamination exceeding Principal Threat Source Material levels; (2) Minimize human and ecological exposure to unacceptable risk associated with radiological and hazardous constituents that are or may be present; (3) Prevent to the extent practicable the migration of radioactive or hazardous contaminants from the closed facility to the groundwater so that concentrations in groundwater do not exceed regulatory standards; (4) Eliminate or control all routes of human exposure to radiological and chemical contamination; and (5) Prevent animal intruder exposure to radioactive and hazardous contamination.

  15. Neutron guide

    DOE Patents [OSTI]

    Greene, Geoffrey L.

    1999-01-01

    A neutron guide in which lengths of cylindrical glass tubing have rectangular glass plates properly dimensioned to allow insertion into the cylindrical glass tubing so that a sealed geometrically precise polygonal cross-section is formed in the cylindrical glass tubing. The neutron guide provides easier alignment between adjacent sections than do the neutron guides of the prior art.

  16. DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements DOE Testing Reveals Samsung Refrigerator Does Not Meet Energy Star Requirements March 16, 2010 - 4:28pm Addthis...

  17. Fuel Reformer, LNT and SCR Aftertreatment System Meeting Emissions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reformer, LNT and SCR Aftertreatment System Meeting Emissions Useful Life Requirements Fuel Reformer, LNT and SCR Aftertreatment System Meeting Emissions Useful Life Requirements EAS ...

  18. Transition Implementation Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-04-24

    This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

  19. Meeting Minutes

    Office of Environmental Management (EM)

    ... EM Quality Assurance Corporate Board Meeting Follow-Up Actions November 13 - 14, 2008 Atlanta, GA General: 1. Invite NRC to the next Board meeting to discuss 1 - 5 columns binning ...

  20. Meeting Agenda

    Broader source: Energy.gov [DOE]

    Meeting agenda for the Flow Cells for Energy Storage Workshop held March 7-8, 2012, in Washington, DC.

  1. Guide to Permitting Electric Transmission Lines in Utah | Open...

    Open Energy Info (EERE)

    GuidanceGuideHandbook Abstract Guide to permitting requirements of federal, state, and local agencies. Author Utah Office of Energy Development Published Utah Office of Energy...

  2. Approval Memorandum for Guides - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Guides by Website Administrator Microsoft Word Document icon ApprovalMemo-Guide (2).doc - Microsoft Word Document, 36 KB (37376

  3. Transuranic Waste Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

  4. DOE G 414.1-4, Safety Software Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

    Broader source: Energy.gov [DOE]

    "This Department of Energy (DOE or Department) Guide provides information plus acceptable methods for implementing the safety software quality assurance (SQA) requirements of DOE O 414.1C, Quality Assurance, dated 6-17-05. DOE O 414.1C requirements supplement the quality assurance program (QAP) requirements of Title 10 Code of Federal Regulations (CFR) 830, Subpart A, Quality Assurance, for DOE nuclear facilities and activities. The safety SQA requirements for DOE, including the National Nuclear Security Administration (NNSA), and its contractors are necessary to implement effective quality assurance (QA) processes and achieve safe nuclear facility operations. DOE promulgated the safety software requirements and this guidance to control or eliminate the hazards and associated postulated accidents posed by nuclear operations, including radiological operations. Safety software failures or unintended output can lead to unexpected system or equipment failures and undue risks to the DOE/NNSA mission, the environment, the public, and the workers. Thus DOE G 414.1-4 has been developed to provide guidance on establishing and implementing effective QA processes tied specifically to nuclear facility safety software applications. DOE also has guidance1 for the overarching QA program, which includes safety software within its scope. This Guide includes software application practices covered by appropriate national and international consensus standards and various processes currently in use at DOE facilities.2 This guidance is also considered to be of sufficient rigor and depth to ensure acceptable reliability of safety software at DOE nuclear facilities. This guidance should be used by organizations to help determine and support the steps necessary to address possible design or functional implementation deficiencies that might exist and to reduce operational hazards-related risks to an acceptable level. Attributes such as the facility life-cycle stage and the hazardous nature of each facility’s operations should be considered when using this Guide. Alternative methods to those described in this Guide may be used provided they result in compliance with the requirements of 10 CFR 830 Subpart A and DOE O 414.1C. Another objective of this guidance is to encourage robust software quality methods to enable the development of high quality safety applications."

  5. Quality Work Plan Communications Requirement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The plan includes a communication requirement that all WAP Grantees must meet. In this ... state Grantees must meet a communication requirement to ensure that the Grantee ...

  6. AcqGuide4.2-OPAM | Department of Energy

    Energy Savers [EERE]

    AcqGuide4.2-OPAM AcqGuide4.2-OPAM Requirements for Contracting with Public Relations Firms PDF icon AcqGuide4.2-OPAM More Documents & Publications Chapter 4 - Administrative...

  7. Montana Stream Permitting Guide Webpage | Open Energy Information

    Open Energy Info (EERE)

    Guide Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Stream Permitting Guide Webpage Abstract Provides a guide to required stream...

  8. UESC Contracting Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contracting Guide UESC Contracting Guide Presentation-given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting-provides guidance on utility energy service contracts (UESCs) for federal facilities. PDF icon fupwg_fall11_thomas.pdf More Documents & Publications Federal Contracting Officers Guidebook UESC Frequently Asked Questions Panel Discussion UESC Contracting Officer Issues Round-Up

  9. Guide on Federal Employee Occupational Medical Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-01

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03. This Guide provides preferred implementing methods and procedures. Canceled by DOE G 341.1-1A.

  10. Competition Requirements | Department of Energy

    Energy Savers [EERE]

    PDF icon Competition Requirements More Documents & Publications Microsoft Word - AG Chapter 6 1 Nov 2010 AcqGuide 5.2-OPAM Chapter 6 - Competition Requirements

  11. Guide to good practices for control of on-shift training

    SciTech Connect (OSTI)

    1998-12-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Control of On-Shift Training, Chapter 5 of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing on-shift training programs. ``Control of On-Shift Training`` is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessary for a coordinated on-shift training program to meet the continuous demand for skilled, well-trained personnel to promote safe and efficient operations.

  12. Meeting Agenda

    Broader source: Energy.gov [DOE]

    Agenda for the DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting held February 8-9, 2005 at Argonne National Laboratory

  13. Acquisition Guide, Chapter 38.1, Strategic Acquisition Transactions: A Guide for

    Broader source: Energy.gov [DOE]

    The Strategic Acquisition Transactions Guide has been updated to reflect changes in the Federal Acquisition Regulation through Federal Acquisition Circular 2005-38 and other technical and editorial changes. A summary of these changes is provided on page three of the attached Guide. This Guide does not include the additional requirements required for orders funded under the Recovery Act. See the Recovery Act Guide for those requirements at http://management.energy.gov/policy~guidance/1672.htm.

  14. General Responsibilities and Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

  15. Project Completion/Closeout Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-26

    This Guide is developed to provide processes and information for project Closeout. It is based on the principles and requirements taken from DOE O 413.3B. This Guide addresses project transition to operations, lessons learned, physical closeout, and financial closeout. Admin Chg 1 dated 10-22-2015.

  16. Meetings - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    meetings SRSCRO Meetings Schedule PLEASE CALL THE SRSCRO OFFICE AT 803-508-7401 FOR MEETING DETAILS 2016 Board Meeting Dates January 28, 2016, 10:00 A.M. March 31, 2016, 10:00 A.M. May 26, 2016, 10:00 A.M. July 28, 2016, 10:00 A.M. September 22, 2016, 10:00 A.M December 1, 2016, 10:00 A.M. 2016 Executive Committee Meeting Dates January 7, 2016, 9:00 A.M. February 4, 2016, 9:00 A.M. March 3, 2016, 9:00 A.M. April 14, 2016, 9:00 A.M. ***Cancelled*** May 5, 2016, 9:00 A.M. June 16, 2016, 9:00 A.M.

  17. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-16

    This Guide provides a framework for identifying and managing key technical, schedule, and cost risks through applying the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-7A, dated 1-12-11. Does not cancel other directives.

  18. 2008 buyer's guide

    SciTech Connect (OSTI)

    2007-12-15

    This annual buyers' guide provides a resource for identifying the companies that provide the products and services required in the power generation industry. It is divided into 3 sections, namely products, services and companies. More than 1750 suppliers mostly in the USA are listed in over 400 product categories.

  19. 2006 buyers' guide

    SciTech Connect (OSTI)

    2005-12-01

    This annual buyers' guide provides a resource for identifying the companies that provide the products and services required in the power generation industry. It is divided into 3 sections, namely products, services and companies. More than 1750 suppliers mostly in the USA are listed in over 400 product categories.

  20. Quality Assurance Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-16

    This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Admin Chg 1, dated 9-27-11. Admin Chg 2, dated 5-8-13.

  1. Password Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-23

    This Department of Energy (DOE) Guide provides detailed guidance to supplement DOE N 205.3, Password Generation, Protection, and Use. No cancellations. Canceled by DOE N 205.18

  2. LEGACY MANAGEMENT REQUIRES INFORMATION

    SciTech Connect (OSTI)

    CONNELL, C.W.; HILDEBRAND, R.D.

    2006-12-14

    ''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

  3. Meeting Minutes

    Office of Environmental Management (EM)

    QA Corporate Board Meeting Las Vegas, NV March 13, 2008 8:00 am - 5:00 pm Meeting Notes The meeting was held at the OCRWM Yucca Mountain campus, Building 9, Room 915 (See Attachment 1, Agenda). After brief introductions (See Attachment 2, Attendees List) and each participant's expression of expectations for the day, Leo Sain (WSRC) provided his perspectives on the Savannah River Site (SRS). Leo commented on the dwindling number of suppliers and used 9975 as an example of where the vendor had

  4. Model Fire Protection Assessment Guide

    Broader source: Energy.gov [DOE]

    This Assessment guide covers the implementation of the DOE's responsibility of assuring that DOE and the DOE Contractors have established Fire Protection Programs that are at the level required for the area being assessed.

  5. Manifold tool guide

    DOE Patents [OSTI]

    Djordjevic, A.

    1983-12-27

    A tool guide is described that makes possible the insertion of cleaning and/or inspection tools into a manifold pipe that will dislocate and extract the accumulated sediment in such manifold pipes. The tool guide basically comprises a right angled tube (or other angled tube as required) which can be inserted in a large tube and locked into a radially extending cross pipe by adjustable spacer rods and a spring-loaded cone, whereby appropriate cleaning tools can be inserted into the cross pipe for cleaning, inspection, etc. 3 figs.

  6. Manifold tool guide

    DOE Patents [OSTI]

    Djordjevic, Aleksandar

    1983-12-27

    A tool guide that makes possible the insertion of cleaning and/or inspection tools into a manifold pipe that will dislocate and extract the accumulated sediment in such manifold pipes. The tool guide basically comprises a right angled tube (or other angled tube as required) which can be inserted in a large tube and locked into a radially extending cross pipe by adjustable spacer rods and a spring-loaded cone, whereby appropriate cleaning tools can be inserted into to cross pipe for cleaning, inspection, etc.

  7. Manifold tool guide

    DOE Patents [OSTI]

    Djordjevic, A.

    1982-07-08

    A tool guide that makes possible the insertion of cleaning and/or inspection tools into a manifold pipe that will dislocate and extract the accumulated sediment in such manifold pipes. The tool guide basically comprises a right angled tube (or other angled tube as required) which can be inserted in a large tube and locked into a radially extending cross pipe by adjustable spacer rods and a spring-loaded cone, whereby appropriate cleaning tools can be inserted into to cross pipe for cleaning, inspection, etc.

  8. Standard Compliance: Guidelines to Help State and Alternative Fuel Provider Fleets Meet Their Energy Policy Act Requirements, 10 CFR Part 490 (Book)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01

    This guidebook addresses the primary requirements of the Alternative Fuel Transportation Program to help state and alternative fuel provider fleets comply with the Energy Policy Act via the Standard Compliance option. It also addresses the topics that covered fleets ask about most frequently.

  9. Standard Compliance: Guidelines to Help State and Alternative Fuel Provider Fleets Meet Their Energy Policy Act Requirements, 10 CFR Part 490 (Book)

    SciTech Connect (OSTI)

    Not Available

    2014-03-01

    This guidebook addresses the primary requirements of the Alternative Fuel Transportation Program to help state and alternative fuel provider fleets comply with the Energy Policy Act via the Standard Compliance option. It also addresses the topics that covered fleets ask about most frequently.

  10. Public Scoping Meeting Public Scoping Meeting David Levenstein

    Office of Legacy Management (LM)

    Public Scoping Meeting Public Scoping Meeting David Levenstein EIS Document Manager David Levenstein EIS Document Manager 2 About Tonight's Scoping Meeting * Scoping is a required step in the National Environmental Policy Act (NEPA) process for preparing an environmental impact statement (EIS). * Scoping is the process of determining the subjects that will be considered and evaluated in an EIS. * Public comments - both oral and written - received during the scoping period are taken into account

  11. Meeting Minutes

    Office of Environmental Management (EM)

    th Environmental Management Quality Assurance Corporate Board Meeting Minutes June 9, 2010 - Chicago, IL Page 1 of 11 Voting Board Members in Attendance (general attendance sheet for the meeting is attached): Brian Anderson - Idaho Robert Brown - Oak Ridge Ray Corey - Richland Jack Craig - Savannah River Bud Danielson -Chief of Nuclear Safety Ralph Holland -Consolidated Business Center Steven Krahn (chair) - Headquarters EM-20 Russell McCallister - Portsmouth/Paducah Bob Murray (vice-chair) -

  12. Meeting Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Meeting America's Pressing Needs -- One Reaction at a Time Meeting America's Pressing Needs -- One Reaction at a Time March 28, 2016 - 4:37pm Addthis Cleaner auto emissions is just one way catalysis research is helping to solve big problems. | Image courtesy of PNNL. Cleaner auto emissions is just one way catalysis research is helping to solve big problems. | Image courtesy of PNNL. Dr. Steven Ashby Director, Pacific Northwest National Laboratory In the Middle Ages, alchemists

  13. Guide to NRC reporting and recordkeeping requirements. Compiled from requirements in Title 10 of the U.S. Code of Federal Regulations as codified on December 31, 1993; Revision 1

    SciTech Connect (OSTI)

    Collins, M.; Shelton, B.

    1994-07-01

    This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the code of Federal Regulations, Chapter 1, on December 31, 1993. It also includes, in a separate section, any of those requirements that were superseded or discontinued between January 1992 and December 1993. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation. The Office of Information Resources Management staff compiled this listing of reporting and recordkeeping requirements to briefly describe each in a single document primarily to help licensees readily identify the requirements. The compilation is not a substitute for the regulations, and is not intended to impose any new requirements or technical positions. It is part of NRC`s continuing efforts to comply with the Paperwork Reduction Act of 1980 and the Office of Management and Budget regulations that mandate effective and efficient Federal information resources management programs.

  14. FEMP ESPC Project Development Resource Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ESPC Project Development Resource Guide FEMP ESPC Project Development Resource Guide Guide charts the Federal Energy Management Program (FEMP) process for providing project development support to agencies developing Energy Savings Performance Contract (ESPC) projects using the U.S. Department of Energy indefinite-delivery, indefinite-quantity ESPC. PDF icon Download the FEMP ESPC Project Development Resource Guide. More Documents & Publications Investment-Grade Audit Kickoff Meeting Sample

  15. 2010 Annual Fuel Economy Guide Now Available | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Annual Fuel Economy Guide Now Available 2010 Annual Fuel Economy Guide Now Available October 15, 2009 - 12:00am Addthis WASHINGTON, DC - The U.S. Environmental Protection Agency and the Department of Energy today unveiled the 2010 Fuel Economy Guide, which gives consumers important information about estimated fuel costs and mileage standards for model year 2010 vehicles. "Every year, consumers use the Fuel Economy Guide to find clean, efficient, cost-effective vehicles that meets their

  16. Guide on Federal Employee Assistance Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-10-18

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1A. Supersedes DOE G 341.1-2.

  17. Advanced Energy Design Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Buildings » Design & Decision Support Tools » Advanced Energy Design Guides Advanced Energy Design Guides Cover of Advanced Energy Design Guide for Small to Medium Office Buildings The 50% AEDGs provide practical approaches to achieve 50% energy savings compared to base code requirements. Download them free from ASHRAE: Small to Medium Office Buildings K-12 School Buildings Medium to Big Box Retail Buildings Large Hospitals Grocery Stores The Advanced Energy Design Guides

  18. ORSSAB Meeting - Annual Meeting August 2014 | Department of Energy

    Office of Environmental Management (EM)

    Annual Meeting August 2014 ORSSAB Meeting - Annual Meeting August 2014 Oak Ridge Site Specific Advisory Board Annual Meeting agenda, meeting materials, and summary of meeting. PDF...

  19. Environmental Compliance Guide

    SciTech Connect (OSTI)

    1981-02-01

    The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects.

  20. 2011 Meeting

    Energy Savers [EERE]

    2 Fuel Cycle Technologies Annual Review Meeting Transactions Report i Table of Contents Fuel Cycle Technologies Program: I ntroduction .................................................. 1 Fuel Cycle Options Campaign ................................................................................ 5 1.1 Fuel Cycle Options Campaign Overview ...................................................................................... 6 1.2 Development of the Comprehensive Options List for 2013 Evaluation

  1. 2011 Meeting

    Energy Savers [EERE]

    1 Fuel Cycle Technologies Annual Review Meeting Transactions Report i Table of Contents Fuel Cycle Technologies Program: Introduction ...................................................... 1 Used Fuel Disposition Campaign ................................................................................ 3 1.1 Used Fuel Disposition Campaign Overview ......................................................................... 4 1.2 Abstract: Review of the Used Fuel Disposition Campaign's Storage and

  2. EIR SCOPING MEETING AGREEMENT FORM EIR SCOPING MEETING FOR ______________________________

    Energy Savers [EERE]

    SCOPING MEETING AGREEMENT FORM EIR SCOPING MEETING FOR ______________________________ Date of Scoping Meeting: Date of Planned On-Site EIR: Name Organization/Position Phone/Email Signature (Agree with Scope) OECM EIR Lead FPD PMSO SCOPE OF EIR INCLUDES: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. Required Specialty Skill Sets Include: Recommended EIR Team Additions: (Feds/DOE Contractors - Name/Organization) Notes: 1. Estimate $___K funding required for

  3. Hydrogen Technologies Safety Guide

    SciTech Connect (OSTI)

    Rivkin, C.; Burgess, R.; Buttner, W.

    2015-01-01

    The purpose of this guide is to provide basic background information on hydrogen technologies. It is intended to provide project developers, code officials, and other interested parties the background information to be able to put hydrogen safety in context. For example, code officials reviewing permit applications for hydrogen projects will get an understanding of the industrial history of hydrogen, basic safety concerns, and safety requirements.

  4. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 1 3.2 (November 2009) PURCHASE ORDERS GUIDING PRINCIPLES J Purchase Orders should normally be issued on a fixed-price basis. J Modifications of Purchase Orders may be used for unpriced orders and for administrative matters on priced orders. J Purchase orders cannot exceed the simplified acquisition threshold. This section discusses the Department of Energy's (DOE) use of purchase orders as described in Federal Acquisition Regulation (FAR) 13.302 and the Department of Energy's Acquisition

  5. Field Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Field Facilities Contacts for Printing and Mail Field Facilities Contacts for Printing and Mail This is the list of DOE field facilities contacts for Printing and Mail as of April 27, 2011. Go to Mail Services Go to Printing Services PDF icon Field_Facilities_Contacts_Print-Mail.pdf More Documents & Publications Director's Perspective by George Miller Tenant Education and Training Fire Safety Committee Membership List

    Ecologist for a Day Field Guide Program supported by: ©2011, Savannah

  6. Conferences and Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Resources » Conferences and Meetings Conferences and Meetings DOE holds three annual workshops to share insights, ideas, and updates on fast-moving SSL technology advances. Each workshop is meticulously planned to encourage lively discussion, maximize networking opportunities, and generate valuable input to guide DOE SSL program planning. In addition, DOE regularly organizes roundtables and joint planning sessions with key lighting industry participants. Because SSL technology and

  7. 2003 Program Review Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Program Review Meeting 2003 Program Review Meeting Find presentations from the Tribal Energy Program Review in November 2003 below. PDF icon Tribal Energy Program Overview PDF icon Tribal Energy Project Summary PDF icon National Renewable Energy Laboratory PDF icon Sandia National Laboratories PDF icon Tribal Energy Internships PDF icon Strategic Planning and Tribal Energy Guide PDF icon Solar Resources and Technology Options PDF icon Wind Resources and Technology Options PDF icon Biomass

  8. Staff meeting

    ScienceCinema (OSTI)

    None

    2011-10-06

    I would like to invite all members of the CERN Personnel to a meeting on Wednesday 16 January 2008 at 3:00 p.m. Main Auditorium (bldg 500) to convey my best wishes for the new year, to review CERN?s activities during 2007 and to present the perspectives for 2008, the year of the LHC start-up. Closed-circuit transmission of the meeting will be available in the Council Chamber and in the AB Auditorium (Meyrin), the AB Auditorium (Prévessin), the IT Auditorium (Bldg. 31) and the AT Auditorium (Bldg. 30). Simultaneous translation into English will be available in the main Auditorium. Best wishes for the festive season! Robert AYMAR

  9. NNMCAB Combined Committee Meeting

    Office of Environmental Management (EM)

    July 8, 2015 2:00 p.m. to 4:00 p.m. NNMCAB Office 94 Cities of Gold Road Santa Fe, NM 87506 AGENDA 2:00 p.m. Call to Order 2:02 p.m. Welcome and Introductions 2:05 p.m. Approval of Agenda 2:10 p.m. Approval of Minutes from May 13, 2015 2:15 p.m. Old Business 2:20 p.m. New Business  Public Comment (Chromium Plume Control Interim Measure And Plume-Center Characterization) see attached form  Restaurant Recommendation Guide  Discussion on August TA-16 Tour in Lieu of Committee Meeting

  10. Meeting Minutes

    Office of Environmental Management (EM)

    QA CORPORATE BOARD MEETING ACTION ITEMS AUGUST 27-28, 2009 KNOXVILLE, TN General: 1. EM Federal/Contractor QA Resources Summaries: develop metrics; update numbers semi-annually; HQ should issue more detailed instructions to field sites to ensure that we have a standardized and consistent approach across the EM-complex for reporting QA resources numbers. 2. Send out Corporate Board (CB) follow-up email to Board members (Site Managers); Executive Committee and Project Managers; Working Group

  11. Meeting Minutes

    Office of Environmental Management (EM)

    Environmental Management Quality Assurance Corporate Board Meeting Minutes July 21, 2011 - Video Conference Page 1 of 5 Voting Board Members in Attendance: Brian Anderson - Idaho Randy Smyth - Oak Ridge Ray Corey - Richland Robert Edwards - Savannah River Bud Danielson -Chief of Nuclear Safety Jack Craig - EMCBC Jim Hutton (chair) - Headquarters Acting EM-20 Russell McCallister - Portsmouth/Paducah Bob Murray (vice-chair) - Headquarters EM-23 No Voting Member Present - Carlsbad Paul Harrington

  12. Meeting Agenda

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    This Year's Winners of the Lawrence Award Meet This Year's Winners of the Lawrence Award July 23, 2015 - 9:15am Addthis Mei Bai, Brookhaven National Laboratory 1 of 9 Mei Bai, Brookhaven National Laboratory Mei Bai's work helps us understand more about how the universe works, from the smallest subatomic particles to the largest stars. A nuclear physicist at Brookhaven National Laboratory, Bai's tool of choice is the Lab's flagship particle accelerator -- the Relativistic Heavy Ion Collider. With

  13. Guide to Closing and Conditioning Ventilated Crawlspaces

    SciTech Connect (OSTI)

    Dickson, Bruce

    2013-01-01

    This how-to guide explains the issues and concerns with conventional ventilated crawlspaces and provides prescriptive measures for improvements that will create healthier and more durable spaces. The methods described in this guide are not the only acceptable ways to treat a crawlspace but represent a proven strategy that works in many areas of the United States. The designs discussed in this guide may or may not meet the local building codes and as such will need to be researched before beginning the project.

  14. ALS User Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Meeting ALS User Meeting web banner ALS User Meeting: October 5-7, 2015 Home Agenda Awards Exhibitors Lodging Posters Registration Transportation Workshops Contact Us User...

  15. ALS User Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ALS User Meeting Print web banner ALS User Meeting: October 5-7, 2015 Home Agenda Awards Exhibitors Lodging Posters Registration Transportation Workshops Contact Us User Meeting...

  16. EERE Program Management Guide - Chapter 7 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 EERE Program Management Guide - Chapter 7 Chapter 7 of this guide includes general program analysis and evaluation concepts such as monitoring work performance, GPRA requirements, evaluation activities, and the EERE SMS program analysis and evaluation stage. PDF icon pmguide_chapter_7.pdf More Documents & Publications EERE Program Management Quick Reference Guide EERE Program Management Guide - Chapter 2 EERE Program Management Guide - Appendix O

  17. Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services » Petroleum Reserves » Strategic Petroleum Reserve » Guidance for Requesting Emergency Oil from the SPR Guidance for Requesting Emergency Oil from the SPR If hurricanes or other unexpected physical conditions disrupt either crude oil imports or domestic production, the Strategic Petroleum Reserve (SPR) is ready to make replacement oil available to the extent approved by the President and/or the Secretary of Energy. This section provides SPR contacts and guidance for requesting

  18. Hydrogen Technologies Safety Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Hydrogen Storage The Fuel Cell Technologies Office (FCTO) is developing onboard automotive hydrogen storage systems that allow for a driving range of more than 300 miles while meeting cost, safety, and performance requirements. Why Study Hydrogen Storage Hydrogen storage is a key enabling technology for the advancement of hydrogen and fuel cell technologies in applications including stationary power, portable power, and transportation. Hydrogen has the highest energy per mass of any

  19. Meeting of the Electricity Advisory Committee Meeting, March...

    Energy Savers [EERE]

    Meeting of the Electricity Advisory Committee Meeting, March 26-27, 2015 - Meeting Minutes and Transcripts Meeting of the Electricity Advisory Committee Meeting, March 26-27, 2015...

  20. Microsoft Word - AcqGuide16pt1 Nov 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ------------------------------- -------------------------- Chapter 16.1 (November 2010) General Guide To Contract Types For Requirements Officials Acquisition Guide ------------------------------- ---------------------- Chapter 16.1 November 2010 2 TABLE OF CONTENTS I. Introduction ................................................................................................................ 3 II. The Selection of Contract

  1. Acquisition Guide, Chapter 38.1, Strategic Acquisition Transactions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    See the Recovery Act Guide for those requirements at http:management.energy.govpolicyguidance1672.htm. PDF icon PF2010-24 AG 38.1 Strategic Acquisition Transactions A Guide ...

  2. EMAB Meeting- September 2010

    Broader source: Energy.gov [DOE]

    Board minutes, transcripts, and presentations from meeting held in Washington, DC for meeting on Septermber 15, 2010.

  3. EMAB Meeting- June 2011

    Broader source: Energy.gov [DOE]

    Board minutes, transcripts, and presentations from meeting held in Washington, DC for meeting on June 23, 2011.

  4. EMAB Meeting- March 2010

    Broader source: Energy.gov [DOE]

    Board minutes, transcripts, and presentations from meeting held in Washington, DC for meeting on March 31, 2010.

  5. EMAB Meeting- February 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Board minutes, transcripts, and presentations from meeting held in Washington, DC for meeting on February 24, 2011.

  6. EMAB Meeting- September 2009

    Broader source: Energy.gov [DOE]

    Board minutes, transcripts, and presentations from meeting held in Washington, DC for meeting on September 30, 2009.

  7. EMAB Meeting- November 2010

    Broader source: Energy.gov [DOE]

    Board minutes, transcripts, and presentations from meeting held in Washington, DC for meeting on November 17, 2010.

  8. Meeting Materials: June 24, 2008 | Department of Energy

    Energy Savers [EERE]

    24, 2008 Meeting Materials: June 24, 2008 L'Enfant Plaza Hotel 480 L'Enfant Plaza, SW, Washington, D.C. 20024 PDF icon Meeting Minutes - June 24 2008.pdf PDF icon Meeting Agenda - June 24 2008.pdf PDF icon Presentation - NEAC Policy Subcommittee - Outlook for Energy and the Role of Nuclear Power.pdf PDF icon Presentation - Nuclear Energy RD Facility Requirements.pdf More Documents & Publications Meeting Materials: September 23, 2008 Meeting Materials: April 29, 2010 Meetings Materials:

  9. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is otherwise informed that a specific action, excluding a termination action, requires manual reporting, the Program Office will notify the CSCO when a manual report is...

  10. CFCC working group meeting: Proceedings

    SciTech Connect (OSTI)

    1995-12-31

    The theme of the meeting was ``A Path to Commercialization`` and discussion was devoted to addressing the nearest-term products and the time frame for implementation. The objectives of the meeting were to identify the barriers to commercialization, methods to overcome these barriers, and the actions required to achieve success. The meeting was planned to bring together government agencies and industry customers and, suppliers to discuss and conclude where the CFCC Program is today, where it is going, and how they plan to get there. It was also planned to join component developers with end users who can describe systems needs and projected schedules for introducing CFCC components in industrial applications.

  11. Radiation Protection Programs Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-03-01

    This Guide amplifies the regulatory requirements of 10 CFR 835 and provides explanations and examples of the basic requirements for implementing the requirements of 10 CFR 835. Cancels DOE G 441.1-1A, DOE G 441.1-2, DOE G 441.1-3A, DOE G 441.1-4A, DOE G 441.1-5, DOE G 441.1-6, DOE G 441.1-7, DOE G 441.1-8, DOE G 441.1-9, DOE G 441.1-10, DOE G 441.1-11, DOE G 441.1-12, DOE G 441.1-13. Canceled by DOE G 441.1-1C.

  12. NIM Guide for Users

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Users NIM Guide for Users Getting Started The NERSC Information Management (NIM) system is a web portal that contains user, login name, usage, and allocations information. First Time Login The first time you log in to NIM, you will have to change your NIM password. Your NIM password is also your NERSC password and all NERSC passwords must abide by certain requirements. See Passwords. Logging In To log into the NIM system, point your web browser to the URL http://nim.nersc.gov. Please use this

  13. Expert Meeting Report: Foundations Research Results

    SciTech Connect (OSTI)

    Ojczyk, C.; Huelman, P.; Carmody, J.

    2013-05-01

    In the Expert Meeting Plan, the NorthernSTAR Team proposed to host two Expert Meetings in calendar year 2011. Invitees to the meetings would include experts in the current field of study, other BA team members, and representatives from DOE and NREL. They will invite leading industry experts to present at these meetings. The Expert Meetings will focus on key systems areas that will be required to meet the Building America performance goals and shall be sufficiently narrow in scope that specific conclusions, action items, and delegation of future tasks can be identified and completed. The two expert meeting topics are 'Foundations' and 'Window Retrofit.' The first session is designed as a webinar only and the second will be a live meeting.

  14. Hanford Site Hazards Guide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Hazards Guide 2016 Approved for Public Release; Further Dissemination Unlimited Hanford Site Hazards Guide Contents ASBESTOS .............................................................................................................................................. 2 BERYLLIUM ........................................................................................................................................... 4 CHEMICAL SAFETY

  15. May 5, 2016, FTCP Face to Face Meeting Presentation - e-TQP

    Office of Environmental Management (EM)

    e-TQP Federal Technical Capability Panel Face-to-Face Meeting May 5, 2016 PRESENTED BY JEANNIE LOZOYA AND WALTER MEEKS DOE NATIONAL TRAINING CENTER Site Implementation  Working Implementation Schedule with Sites  User Guide - Available on Website  Training for the Sites  NTC Support  NTC Documenting Feedback provided by current Users Website: https://etqp.ntc.doe.gov 2 Site Requirements  Commit Resources - Challenge for Sites  NTC will provide support  System Set Up and

  16. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 5.1 (May 2015) 1 Congressional Notifications [Reference: FAR 5.3] Overview This chapter discusses the requirements and procedures for providing Congressional notice for certain solicitation or contract actions. Advance notification of contract actions, issuance of a final Requests for Proposal (RFP), and contract terminations is required at specific dollar thresholds. These notifications are overseen by the DOE Office of Congressional and Intergovernmental Affairs (CI). Members of

  17. Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-29

    The guide provide DOE line management information useful for implementing the provisions of DOE P 450.4A and the requirements and responsibilities of DOE O 450.2. Supersedes DOE G 450.4-1B and DOE G 450.3-3.

  18. Studying the Communications Requirements of Electric Utilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities ...

  19. Style Guide Full Text

    Broader source: Energy.gov [DOE]

    The style guide features formatting, spelling, punctuation, capitalization, grammar, and language guidelines.

  20. Vol 2, Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-12-26

    This Guide provides guidance for addressing the requirements of DOE P 450.4 and DEAR integrated SMS clauses promulgated in 48 CFR 970.5204-2, 48 CFR 970.5204-78, and 48 CFR 970.1001.

  1. Vol 1, Integrated Safety Management System Guide,

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-11-26

    This Guide provides guidance for addressing the requirements of DOE P 450.4 and DEAR integrated SMS clauses promulgated in 48 CFR 970.5204-2, 48 CFR 970.5204-78, and 48 CFR 970.1001.

  2. Guide on Federal Employee Assistance Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-01

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03, and applies only to Federal employees. Canceled by DOE G 341.1-2A.

  3. Guide on Federal Employee Occupational Medical Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-10-18

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1A, and provides preferred implementing methods and procedures. Supersedes DOE G 341.1-1.

  4. Radiation Embrittlement Archive Web App User Guide

    SciTech Connect (OSTI)

    Klasky, Hilda B; Williams, Paul T; Bass, Bennett Richard

    2013-09-01

    The Radiation Embrittlement Archive (REAP) Web App User Guide describes the software requirements to use the REAP web app, how to navigate, search, enter and extract data from the archive.

  5. Order Module--RADIATION PROTECTION PROGRAMS GUIDE

    Broader source: Energy.gov [DOE]

    The familiar level of this module is designed to provide the basic information related to DOEG 441.1-1C, Radiation Protection Programs Guide, as required in DOE-STD-1174-2003, Radiation Protection...

  6. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27

    This Guide provides acceptable approaches for implementing the Quality Assurance requirements and criteria of DOE O 413.3A related to the development and implementation of a Quality Assurance Program for the project. No cancellations.

  7. Clean Cities Guide to Alternative Fuel and Advanced Medium- and Heavy-Duty Vehicles

    SciTech Connect (OSTI)

    2013-08-01

    Today's fleets are increasingly interested in medium-duty and heavy-duty vehicles that use alternative fuels or advanced technologies that can help reduce operating costs, meet emissions requirements, improve fleet sustainability, and support U.S. energy independence. Vehicle and engine manufacturers are responding to this interest with a wide range of options across a steadily growing number of vehicle applications. This guide provides an overview of alternative fuel power systems--including engines, microturbines, electric motors, and fuel cells--and hybrid propulsion systems. The guide also offers a list of individual medium- and heavy-duty vehicle models listed by application, along with associated manufacturer contact information, fuel type(s), power source(s), and related information.

  8. Clean Cities Guide to Alternative Fuel and Advanced Medium- and Heavy-Duty Vehicles (Book)

    SciTech Connect (OSTI)

    Not Available

    2013-08-01

    Today's fleets are increasingly interested in medium-duty and heavy-duty vehicles that use alternative fuels or advanced technologies that can help reduce operating costs, meet emissions requirements, improve fleet sustainability, and support U.S. energy independence. Vehicle and engine manufacturers are responding to this interest with a wide range of options across a steadily growing number of vehicle applications. This guide provides an overview of alternative fuel power systems?including engines, microturbines, electric motors, and fuel cells?and hybrid propulsion systems. The guide also offers a list of individual medium- and heavy-duty vehicle models listed by application, along with associated manufacturer contact information, fuel type(s), power source(s), and related information.

  9. Guide to good practices for notifications and investigation of abnormal events

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Notifications, Chapter VII, and Investigation of Abnormal Events, Chapter VI, of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities.`` The practices in this guide should be considered when planning or reviewing programs for notifications and investigation of abnormal events. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. ``Notifications`` and ``Investigation of Abnormal Events`` are elements of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated notifications program and a consistent method for investigating abnormal events to promote safe and efficient operations.

  10. Guide to good practices for notifications and investigation of abnormal events

    SciTech Connect (OSTI)

    NONE

    1998-12-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Notifications, Chapter VII, and Investigation of Abnormal Events, Chapter VI, of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing programs for notifications and investigation of abnormal events. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Notifications and Investigation of Abnormal Events are elements of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated notifications program and a consistent method for investigating abnormal events to promote safe and efficient operations.

  11. Meeting Materials: Consent-Based Siting Public Meeting in Sacramento...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Sacramento (April 26, 2016) Meeting Materials: Consent-Based Siting Public Meeting in Sacramento (April 26, 2016) Meeting Materials: Consent-Based Siting Public Meeting in ...

  12. Meeting Materials: Consent-Based Siting Public Meeting in Chicago...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chicago (March 29, 2016) Meeting Materials: Consent-Based Siting Public Meeting in Chicago (March 29, 2016) Meeting Materials: Consent-Based Siting Public Meeting in Chicago (March ...

  13. Meeting Materials: Consent-Based Siting Public Meeting in Atlanta...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Atlanta (April 11, 2016) Meeting Materials: Consent-Based Siting Public Meeting in Atlanta (April 11, 2016) Meeting Materials: Consent-Based Siting Public Meeting in Atlanta (April ...

  14. Electricity Advisory Committee Meeting, June 16-17, 2014 - Meeting...

    Office of Environmental Management (EM)

    Electricity Advisory Committee Meeting, June 16-17, 2014 - Meeting Summaries and Transcripts Meeting summaries and transcripts for the June 16-17, 2014 meeting of the Electricity ...

  15. Electricity Advisory Committee Meeting, March 12-13, 2014 - Meeting...

    Energy Savers [EERE]

    Electricity Advisory Committee Meeting, March 12-13, 2014 - Meeting Minutes and Transcripts Meeting minutes and transcripts for the March 12-13, 2014 meeting of the Electricity ...

  16. Electricity Advisory Committee Meeting, January 24, 2014 - Meeting...

    Energy Savers [EERE]

    Electricity Advisory Committee Meeting, January 24, 2014 - Meeting Summary and Transcript Meeting summary and transcript for the January 24, 2014 meeting of the Electricity ...

  17. Electricity Advisory Committee Meeting, March 5-6, 2012 - Meeting...

    Energy Savers [EERE]

    Electricity Advisory Committee Meeting, March 5-6, 2012 - Meeting Minutes and Transcripts Meeting minutes and transcripts for the March 5-6, 2012 meeting of the Electricity ...

  18. Electricity Advisory Committee Meeting, July 12, 2011 - Meeting...

    Office of Environmental Management (EM)

    Electricity Advisory Committee Meeting, July 12, 2011 - Meeting Minutes and Transcript Meeting minutes and transcript for the July 12, 2011 meeting of the Electricity Advisory ...

  19. Electricity Advisory Committee Meeting, June 11-12, 2012 - Meeting...

    Energy Savers [EERE]

    Electricity Advisory Committee Meeting, June 11-12, 2012 - Meeting Minutes and Transcripts Meeting minutes and transcripts for the June 11-12, 2012 meeting of the Electricity ...

  20. Electricity Advisory Committee Meeting, March 10, 2011 - Meeting...

    Office of Environmental Management (EM)

    Electricity Advisory Committee Meeting, March 10, 2011 - Meeting Minutes and Transcript Meeting minutes and transcript for the March 10, 2011 meeting of the Electricity Advisory ...

  1. Electricity Advisory Committee Meeting, June 5-6, 2013 - Meeting...

    Office of Environmental Management (EM)

    Electricity Advisory Committee Meeting, June 5-6, 2013 - Meeting Summaries and Transcripts Meeting summaries and transcripts for the June 5-6, 2013 meeting of the Electricity ...

  2. Electricity Advisory Committee Meeting, December 11, 2008: Meeting...

    Office of Environmental Management (EM)

    December 11, 2008: Meeting transcript Electricity Advisory Committee Meeting, December 11, 2008: Meeting transcript Transcript of the Electricity Advisory Committee Meeting held on ...

  3. Electricity Advisory Committee Meeting Notice of Open Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Advisory Committee Meeting Notice of Open Meeting October 29, 2010: Federal ... PDF icon Electricity Advisory Committee Meeting: Notice of Open Meeting October 29, 2010 ...

  4. Electricity Advisory Committee Meeting Notice of Open Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Advisory Committee Meeting Notice of Open Meeting March 10, 2011: Federal ... PDF icon Electricity Advisory Committee Meeting: Notice of Open Meeting March 10, 2011. ...

  5. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Acquisition Guide Chapter 15.1 Source Selection Guide Acquisition Guide Chapter 15 1 - Source Selection Guide Acquisition Templates

  6. Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision Makers | Department of Energy Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers This step-by-step manual guides readers through the process of implementing a fuel cell stationary power project. The guide outlines the basics of fuel cell technology and describes how fuel cell projects can meet on-site energy service needs as well as support strategic agency

  7. Meetings and Workshops

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meetings and Workshops Ultrafast Laser Study Committee Visits LLNL National Academy Committee Meeting Constantin Haefner (left), NIF & Photon Science program director for advanced ...

  8. Public Outreach committee meeting

    Broader source: Energy.gov [DOE]

    The ORSSAB Public Outreach Committee meeting is open to the public. The conference call information will be provided as the meeting approaches.

  9. ORSSAB monthly meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    This month's ORSSAB board meeting will focus on the ETTP Zone 1 soils proposed plan. The meeting is open to the public.

  10. 2013 ALS User Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ALS User Meeting banner Home Agenda Awards Exhibitors Lodging Posters Registration T-Shirt Contest Transportation Workshops Contact Us User Meeting Archives Users' Executive...

  11. 2013 ALS User Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 ALS User Meeting Print banner Home Agenda Awards Exhibitors Lodging Posters Registration T-Shirt Contest Transportation Workshops Contact Us User Meeting Archives Users'...

  12. Acquisition Guide Chapter 15 1 - Source Selection Guide | Department of

    Office of Environmental Management (EM)

    Energy 5 1 - Source Selection Guide Acquisition Guide Chapter 15 1 - Source Selection Guide PDF icon Acquisition Guide Chapter 15 1 - (Final - Changes Accepted)(April 2013).pdf More Documents & Publications DOE Source Evaluation Board (SEB) Document Templates DOE Acquisition Guide Chapter 15.1 Source Selection Guide OPAM Policy Acquisition Guides

  13. Metering Best Practices: A Guide to Achieving Utility Resource Efficiency

    Broader source: Energy.gov [DOE]

    Guide describes information about energy and resource metering at federal facilities, including metering requirements under the Energy Policy Act of 2005.

  14. Metering Best Practices: A Guide to Achieving Utility Resource Efficiency

    SciTech Connect (OSTI)

    2015-03-02

    Guide describes information about energy and resource metering at federal facilities, including metering requirements under the Energy Policy Act of 2005.

  15. Energy Literacy Social Studies Guide - Essential Principle 4...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Energy Literacy Social Studies Guide - Essential Principle 4 Below is information about ... Curriculum Social Studies Time Required 3-4 class periods Owner American Geosciences ...

  16. Energy Literacy Social Studies Guide - Essential Principle 2...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Energy Literacy Social Studies Guide - Essential Principle 2 Below is information about ... Curriculum Social Studies Time Required 3-4 class periods Owner American Geosciences ...

  17. Energy Literacy Social Studies Guide - Essential Principle 1...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Energy Literacy Social Studies Guide - Essential Principle 1 Below is information about ... follows precise natural laws. Curriculum Social Studies Time Required 3-4 class periods ...

  18. Energy Literacy Social Studies Guide - Essential Principle 3...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Energy Literacy Social Studies Guide - Essential Principle 3 Below is information about ... Curriculum Social Studies Time Required 3-4 class periods Owner American Geosciences ...

  19. Energy Literacy Video Analysis Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Video Analysis Guide Energy Literacy Video Analysis Guide Below is information about the student activity/lesson plan from your search. Grades K-12 Subject Fundamentals of energy Summary A guide for discussion related to the information and imagery presented in the Energy Literacy video series. There are two versions of the guide, one for the teacher and one for the students. Curriculum Natural Sciences, Social Studies, Physics, Politics, Economics Time Required 3-4 class periods Owner American

  20. Text Processing an Order or Guide - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements an Order or Guide Processing a Policy or Notice Processing an Order or Guide Canceling a Directive by Website Administrator Development from justification memorandum through review and publication Justification Memorandum (Initial step towards developing an unclassified Order or Guide) Office of Primary Interest (OPI Creates a justification memorandum for non-NNSA element or justification memorandum for an NNSA element to develop or revise an Order or Guide. Obtains signature of

  1. Biosafety Facilities - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, Biosafety Facilities by David Freshwater Functional areas: Defense Nuclear Facility Safety and Health Requirement, Safety and Security, The Guide assists DOENNSA field elements...

  2. Acquisition Guide Chapter 70.31A- Costs Associated with Whistleblower Actions

    Broader source: Energy.gov [DOE]

    The subject guide chapter is revised to incorporate the requirements of Section 627 of the Energy Policy Act of 2005.

  3. NTERTraining Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NTERTraining Guides NTERTraining Guides PDF icon Advanced Authoring Training Participant_Guide_2012.pdf PDF icon Kuda TrainingGuide_053013.pdf PDF icon NTER Authoring Training Participant_Guide_2012.pdf PDF icon Creating a Test in NTER Participant_Guide_2012.pdf More Documents & Publications Kuda Training Guide_053013 NTER Authoring Training Participant_Guide_2012 Creating a Test in NTER Participant_Guide_2012

  4. UDAC Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meetings UDAC Meetings November 27, 2013 UDAC Meeting - December 16, 2013 Federal Register Notice for December 16, 2013 UDAC Meeting UDAC 2014 Findings and Recommendations Minutes from December 16, 2013 UDAC Meeting November 20, 2013 UDAC Meeting - December 9, 2013 Federal Register Notice for December 9, 2013 UDAC Meeting Federal Register Notice for December 9, 2013 UDAC Meeting Meeting documents from December 9, 2013 UDAC Meeting Minutes from December 9, 2013 UDAC Meeting November 18, 2013 UDAC

  5. EMAB Meeting- December 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Board minutes, transcripts, and presentations from meeting held in Washington, DC on December 5, 2011.

  6. ALS User Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ALS User Meeting October 3-5, 2011 Lawrence Berkeley National Laboratory, California

  7. AGU Fall Meeting 2014

    Broader source: Energy.gov [DOE]

    The American Geophysical Union's 47th Annual Fall Meeting will showcase groundbreaking research in the geosciences.

  8. QA Summit Meeting Minutes

    Office of Environmental Management (EM)

    Quality Assurance Summit Meeting Minutes February 17, 2011 - Oak Ridge, TN Page 1 of 9 Introduction by Robert Brown (Deputy Site Manager for Oak Ridge) Robert Brown welcomed everyone to the meeting and provided opening remarks. Logistical Information by Larry Perkins (EM-23) Larry Perkins provided the logistics for the meeting and noted that the meeting presentations materials and meeting minutes will be made available online at http://www.em.doe.gov/Pages/QACorporateBoard.aspx Opening Remarks

  9. Measure Guideline: Guide to Attic Air Sealing

    SciTech Connect (OSTI)

    Lstiburek, J.

    2014-09-01

    The Guide to Attic Air Sealing was completed in 2010 and although not in the standard Measure Guideline format, is intended to be a Measure Guideline on Attic Air Sealing. The guide was reviewed during two industry stakeholders meetings held on December 18th, 2009 and January 15th, 2010, and modified based on the comments received. Please do not make comments on the Building America format of this document. The purpose of the Guide to Attic Air Sealing is to provide information and recommendations for the preparation work necessary prior to adding attic insulation. Even though the purpose of this guide is to save energy - health, safety and durability should not be compromised by energy efficiency. Accordingly, combustion safety and ventilation for indoor air quality are addressed first. Durability and attic ventilation then follow. Finally, to maximize energy savings, air sealing is completed prior to insulating. The guide is intended for home remodelers, builders, insulation contractors, mechanical contractors, general contractors who have previously done remodeling and homeowners as a guide to the work that needs to be done.

  10. Site Management Guide

    Broader source: Energy.gov [DOE]

    The main purpose of the LM Site Management Guide is to be a reference document for LM and its contractor(s) and to provide accurate and consistent information across the LM organization. The guide is updated annually.

  11. Meeting Attendance - 32nd Tritium Focus Group Meeting | Department of

    Office of Environmental Management (EM)

    Energy 2nd Tritium Focus Group Meeting Meeting Attendance - 32nd Tritium Focus Group Meeting Attendees to the 32nd Tritium Focus Group Meeting held in Germantown, Maryland, April 23-25, 2013. PDF icon Meeting Attendance - 32nd Tritium Focus Group Meeting More Documents & Publications Meeting Attendance - 33rd Tritium Focus Group Meeting Meeting Attendance - 34th Tritium Focus Group Meeting Tritium 2013 Presentation

  12. Meeting Attendance - 35th Tritium Focus Group Meeting | Department of

    Office of Environmental Management (EM)

    Energy 5th Tritium Focus Group Meeting Meeting Attendance - 35th Tritium Focus Group Meeting Attendees to the 35th Tritium Focus Group Meeting held in Princeton, NJ on May 5-7, 2015. PDF icon Meeting Attendance - 35th Tritium Focus Group Meeting More Documents & Publications Meeting Attendance - 34th Tritium Focus Group Meeting Meeting Attendance - 33rd Tritium Focus Group Meeting

  13. Reservoir Modeling Working Group Meeting

    Broader source: Energy.gov [DOE]

    Reservoir Modeling working group meeting presentation on May 10, 2012 at the 2012 Peer Review Meeting.

  14. Notices ACTION: Notice of Open Teleconference Meeting.

    Energy Savers [EERE]

    405 Federal Register / Vol. 78, No. 160 / Monday, August 19, 2013 / Notices ACTION: Notice of Open Teleconference Meeting. SUMMARY: This notice announces a meeting of the Advanced Scientific Computing Advisory Committee (ASCAC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. DATES: Tuesday, September 3, 2013, 12:00 p.m. to 3:00 p.m. ADDRESSES: The meeting is open to the public. To access the

  15. Technical Standards Style Guide

    Broader source: Energy.gov [DOE]

    Style Guide for the Preparation of DOE Technical Standards (Standards, Handbooks, and Technical Standards Lists) May 13, 2015

  16. A DESK GUIDE TO THE DAVIS-BACON ACT

    Energy Savers [EERE]

    DOE DBA Desk Guide - Rev. 1 July 30, 2012 A DESK GUIDE TO THE DAVIS-BACON ACT Prevailing Wage Requirements for Contractors on Federal Contracts and DBA-Covered Federally Financed or Assisted Construction Projects Introduction. The U. S. Department of Energy (DOE) has prepared this Desk Guide for the use of contractors and subcontractors performing work on construction projects under a federal contract, or under a statute authorizing federal financial assistance, that requires the application of

  17. Contractor Legal Management Requirements

    Broader source: Energy.gov [DOE]

    The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.)

  18. BY16 DOE IT CPIC Guide_Final | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BY16 DOE IT CPIC Guide_Final BY16 DOE IT CPIC Guide_Final PDF icon BY16 DOE IT CPIC Guide_Final.pdf More Documents & Publications DOE Guide to IT Capital Planning and Investment Control BY 2016 Audit Report: IG-0841 IT Reporting Format and Requirements for the BY 2017 Budget Submission

  19. Regulatory facility guide for Ohio

    SciTech Connect (OSTI)

    Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O.; Rymer, A.C.

    1994-02-28

    The Regulatory Facility Guide (RFG) has been developed for the DOE and contractor facilities located in the state of Ohio. It provides detailed compilations of international, federal, and state transportation-related regulations applicable to shipments originating at destined to Ohio facilities. This RFG was developed as an additional resource tool for use both by traffic managers who must ensure that transportation operations are in full compliance with all applicable regulatory requirements and by oversight personnel who must verify compliance activities.

  20. ESnet Requirements Workshops

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Workshops Summary for Sites Eli Dart, Network Engineer ESnet Network Engineering Group ESnet Site Coordinating Committee Meeting Clemson, SC February 2, 2011 Lawrence Berkeley National Laboratory U.S. Department of Energy | Office of Science Overview ESnet requirements workshops - what are they? Common themes Discussion of subset of requirements learned * Examples of trends * Success stories * Upcoming needs that are currently unmet Thoughts for discussion 2/1/11 2 Lawrence Berkeley

  1. CASL Industry Council Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industry Council Meeting 4 - 5 November 2015 Meeting Minutes The autumn 2015 meeting of the Industry Council (IC) for the Consortium for Advanced Simulation of Light Water Reactors (CASL) was held on 4 - 5 November 2015 at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, TN. The first day of meeting was a joint meeting of the CASL Industry and Science Councils and was held at the Spallation Neutron Source (SNS) facility at ORNL. An independent IC meeting was held the morning of the second

  2. Packaging Review Guide for Reviewing Safety Analysis Reports for Packagings

    SciTech Connect (OSTI)

    DiSabatino, A; Biswas, D; DeMicco, M; Fisher, L E; Hafner, R; Haslam, J; Mok, G; Patel, C; Russell, E

    2007-04-12

    This Packaging Review Guide (PRG) provides guidance for Department of Energy (DOE) review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE Order 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his or her review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. This PRG is generally organized at the section level in a format similar to that recommended in Regulatory Guide 7.9 (RG 7.9). One notable exception is the addition of Section 9 (Quality Assurance), which is not included as a separate chapter in RG 7.9. Within each section, this PRG addresses the technical and regulatory bases for the review, the manner in which the review is accomplished, and findings that are generally applicable for a package that meets the approval standards. This Packaging Review Guide (PRG) provides guidance for DOE review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE O 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. The primary objectives of this PRG are to: (1) Summarize the regulatory requirements for package approval; (2) Describe the technical review procedures by which DOE determines that these requirements have been satisfied; (3) Establish and maintain the quality and uniformity of reviews; (4) Define the base from which to evaluate proposed changes in scope and requirements of reviews; and (5) Provide the above information to DOE organizations, contractors, other government agencies, and interested members of the general public. This PRG was originally published in September 1987. Revision 1, issued in October 1988, added new review sections on quality assurance and penetrations through the containment boundary, along with a few other items. Revision 2 was published October 1999. Revision 3 of this PRG is a complete update, and supersedes Revision 2 in its entirety.

  3. ACQUISITION GUIDE CHAPTER 31.4: ALLOWABLILITY OF INCURRED COSTS

    Broader source: Energy.gov [DOE]

    A new chapter (31.4) has been added to the Acquisition Guide. It discusses determining the allowability of incurred costs, emphasizing the five FAR requirements, especially the reasonableness requirement.

  4. Properly spaced rod guides reduce wear in directional wells

    SciTech Connect (OSTI)

    Duan, Y.; Yuan, X. )

    1994-10-17

    In deviated wells, guides or wheels properly placed on the rode string can prevent both wear on the tubing and the rods. Proper placement involves integrating information on hole trajectory, rod string properties, and economics. Too many guides or wheels will increase polished rod load, thereby increasing recovery cost. But two few guides or improper spacing of guides can either prevent rod and tubing wear nor lower polished rod load. Consequently, optimal rod guide spacing is required. The paper discusses a stress analysis, spacing and deflection, and optimal spacing.

  5. Electricity Advisory Committee Meeting, October 19-20, 2011 - Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minutes and Transcripts | Department of Energy Meeting, October 19-20, 2011 - Meeting Minutes and Transcripts Electricity Advisory Committee Meeting, October 19-20, 2011 - Meeting Minutes and Transcripts Meeting minutes and transcripts for the October 19-20, 2011 meeting of the Electricity Advisory Committee. PDF icon EAC Meeting Minutes October 19-20, 2011.pdf PDF icon EAC Meeting Transcript October 19, 2011.pdf PDF icon EAC Meeting Transcript October 20, 2011.pdf More Documents &

  6. Focus Group Meeting (Topical Meeting) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement Inspection Schedule More Documents & Publications Focus Group Meeting (Activities Status) Focus Group Meeting (Activities Status) Focus Group Meeting (Topical Wrap-Up)

  7. Joint Meeting on Hydrogen Delivery Modeling and Analysis Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Attendees List Joint Meeting on Hydrogen Delivery Modeling and Analysis Meeting Attendees List Attendee list from the Joint Meeting on Hydrogen Delivery Modeling and Analysis, May...

  8. PIC Meeting Transcribed Flipcharts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Diff. than 2013 Oct. 4. Land Conveyance EA 5. Natural Gas Pipeline EIS 6. Budget meetings 7. Site-wide permit 8. NEPA ROD for TC & WM EIS Page 15 PIC Meeting Transcribed ...

  9. NARUC Summer Committee Meetings

    Broader source: Energy.gov [DOE]

    At the NARUC Summer Committee Meetings, you will meet utility regulators from every State in the U.S., along with federal and international officials. This is a wonderful opportunity for learning...

  10. ORSSAB monthly board meeting

    Broader source: Energy.gov [DOE]

    The meeting is open to the public. Participants at this week's meeting will receive a presentation on the Federal Oversight Model—Ensuring a Safe Work Environment.

  11. ORSSAB monthly meeting

    Broader source: Energy.gov [DOE]

    The meeting is open to the public. Participants at this week's meeting will receive a presentation on "Y-12 Mercury Cleanup Strategy and Plan for a Y-12 Water Treatment Plant."

  12. NUG Business Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NUG Business Meeting NUG Business Meeting February 26, 2015 Location: Berkeley Lab and NERSC OSF (All events are available for remote access over the web). Dates: Feb. 23-26, 2015...

  13. NASEO Midwest Regional Meeting

    Broader source: Energy.gov [DOE]

    The National Association of State Energy Officials (NASEO) is hosting its Midwest Regional Meeting in Des Moines, Iowa.

  14. 2011 User Meeting Agenda

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 User Meeting Agenda Home Agenda Awards Exhibitors Lodging Posters Registration Photo Contest Transportation Workshops This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Meeting Archives Users' Executive Committee The 2011 ALS User Meeting begins registation begins at 07:30 on Monday, October 3, outside the Building 50 Auditorium. The meeting itself will start at 08:25 inside the Building 50 Auditorium; all plenary sessions will also be held at

  15. User Meeting Awards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Meeting Awards web banner ALS User Meeting Awards See the 2013 User Meeting Awards Winners Home Agenda Awards Exhibitors Lodging Posters Registration Transportation Workshops This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Meeting Archives Users' Executive Committee The ALS Users' Executive Committee invites ALS users and staff to submit nominations in recognition of the people who have made significant contributions to the scientific and

  16. User Meeting Awards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Meeting Awards Print web banner ALS User Meeting Awards See the 2013 User Meeting Awards Winners Home Agenda Awards Exhibitors Lodging Posters Registration Transportation Workshops This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Meeting Archives Users' Executive Committee The ALS Users' Executive Committee invites ALS users and staff to submit nominations in recognition of the people who have made significant contributions to the scientific

  17. NASEO 2015 Annual Meeting

    Broader source: Energy.gov [DOE]

    The National Association of State Energy Officials (NASEO) Annual Meeting will be held in San Diego, California.

  18. Technical Meeting: Reference Guide for a Transaction-Based Building...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    efficient monitoring and controlling of plug loads, reduction of standby losses, detection of faulty devices, and demand response management CBERD: Integrated Sensors and Controls

  19. Chairs Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chairs Meetings Chairs Meetings September 2, 2015 Chairs Meeting - September 2015 EM SSAB minutes, agenda, and presentations from meeting held in Santa Fe, New Mexico. April 30, 2015 Chairs Meeting - April 2015 EM SSAB minutes, agenda, and presentations from meeting held in Augusta, Georgia. September 17, 2014 Chairs Meeting - September 2014 EM SSAB minutes, agenda, and presentations from meeting held in Idaho Falls, Idaho. April 28, 2014 Chairs Meeting - April 2014 EM SSAB minutes, agenda, and

  20. EMAB Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMAB Meetings EMAB Meetings RSS May 11, 2016 EMAB Meeting - May 2016 Board minutes, transcripts, and presentations from meeting held in Aiken, South Carolina September 30, 2015 EMAB Meeting - September 2015 Board minutes, transcripts, and presentations from meeting held in Arlington, Virginia May 20, 2014 EMAB Meeting - May 2014 Board minutes, transcripts, and presentations from meeting held in Richland, Washington June 5, 2013 EMAB Meeting - June 2013 Board minutes, transcripts, and

  1. User's guide for ENVSTD24 program, Version 2. 4

    SciTech Connect (OSTI)

    Hanlon, R.L.; Connell, L.M.

    1993-05-01

    On January 30, 1989, the US Department of Energy (DOE) promulgated an interim rule entitled [open quotes]Energy Conservation Voluntary Performance Standards for New Commercial and Multi-Family High Rise Residential Buildings; Mandatory for New Federal Buildings[close quotes] (10 CFR Part 435, Subpart A). These standards require federal agencies to design all future federal commercial and multifamily high-rise residential buildings in accordance with the standards, or demonstrate that their current requirements already meet or exceed the energy-efficiency requirements of the standards. Although these newly enacted standards do not regulate the design of nonfederal buildings, the DOE recommends that all design professionals use the standards as guidelines for designing energy-conserving buildings. To encourage private sector use, the DOE published the standards in the January 30, 1989, Federal Register in the format typical of commercial standards. The Pacific Northwest Laboratory developed several computer programs for the DOE to make it easier for designers to comply with the standards. One of the programs, ENVSTD24 (Version 2.4), is detailed in this user's guide and is provided on the accompanying diskettes. The program will facilitate the designer's use of the standards dealing specifically with building envelope design. Using this program will greatly simplify the designer's task of performing the calculations needed to determine if a design complies with the standards.

  2. TEC Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meetings TEC Meetings TEC would meet twice per year to identify and discuss issues of concern regarding DOE transportation activities. Issues included planning for transportation, ...

  3. Preliminary results of calculations for heavy-water nuclear-power-plant reactors employing {sup 235}U, {sup 233}U, and {sup 232}Th as a fuel and meeting requirements of a nonproliferation of nuclear weapons

    SciTech Connect (OSTI)

    Ioffe, B. L.; Kochurov, B. P.

    2012-02-15

    A physical design is developed for a gas-cooled heavy-water nuclear reactor intended for a project of a nuclear power plant. As a fuel, the reactor would employ thorium with a small admixture of enriched uranium that contains not more than 20% of {sup 235}U. It operates in the open-cycle mode involving {sup 233}U production from thorium and its subsequent burnup. The reactor meets the conditions of a nonproliferation of nuclear weapons: the content of fissionable isotopes in uranium at all stages of the process, including the final one, is below the threshold for constructing an atomic bomb, the amount of product plutonium being extremely small.

  4. DOE Guide to IT Capital Planning and Investment Control BY 2016 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Guide to IT Capital Planning and Investment Control BY 2016 DOE Guide to IT Capital Planning and Investment Control BY 2016 DOE Guide to IT Capital Planning and Investment Control BY 2016 PDF icon BY16 DOE IT CPIC Guide_Final.pdf More Documents & Publications BY16 DOE IT CPIC Guide_Final Audit Report: IG-0841 IT Reporting Format and Requirements for the BY 2017 Budget Submission

  5. Studying the Communications Requirements of Electric Utilities to Inform

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Smart Grid Policies- Public Meeting | Department of Energy Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Transcript of public meeting on Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies PDF icon Studying the Communications Requirements of Electric

  6. 2009 High Temperature Membrane Working Group Meeting Archives | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 9 High Temperature Membrane Working Group Meeting Archives 2009 High Temperature Membrane Working Group Meeting Archives View information from meetings of the High Temperature Membrane Working Group held in 2009. November 16, 2009, Palm Springs, California This meeting was held in conjunction with the Fuel Cell Seminar. Minutes U.S. Fuel Cell Council: The Voice of the Fuel Cell Industry Membrane Requirements for Back-up Power Applications, Michael Hicks, IdaTech GenSys Blue: Fuel

  7. Relativistic Guiding Center Equations

    SciTech Connect (OSTI)

    White, R. B.; Gobbin, M.

    2014-10-01

    In toroidal fusion devices it is relatively easy that electrons achieve relativistic velocities, so to simulate runaway electrons and other high energy phenomena a nonrelativistic guiding center formalism is not sufficient. Relativistic guiding center equations including flute mode time dependent field perturbations are derived. The same variables as used in a previous nonrelativistic guiding center code are adopted, so that a straightforward modifications of those equations can produce a relativistic version.

  8. Sensor Characteristics Reference Guide

    SciTech Connect (OSTI)

    none,

    2013-04-01

    The purpose of the guide is to inform building owners and operators of the current status, capabilities, and limitations of sensor technologies. It is hoped that this guide will aid in the design and procurement process and result in successful implementation of building sensor and control systems. DOE will also use this guide to identify research priorities, develop future specifications for potential market adoption, and provide market clarity through unbiased information.

  9. Meeting Attendance - 33rd Tritium Focus Group Meeting | Department of

    Office of Environmental Management (EM)

    Energy 3rd Tritium Focus Group Meeting Meeting Attendance - 33rd Tritium Focus Group Meeting Attendees to the 33rd Tritium Focus Group Meeting, held in Aiken, South Carolina, April 22-24, 2014. PDF icon Meeting Attendance - 33rd Tritium Focus Group Meeting More Documents & Publications Meeting Attendance - 32nd Tritium Focus Group Meeting Tritium Instrument Demonstration Station (TIDS) Tritiated Water Challenge in Fukushima Daiichi

  10. Electricity Advisory Committee Meeting, July 12, 2011 - Meeting Minutes and

    Energy Savers [EERE]

    Transcript | Department of Energy July 12, 2011 - Meeting Minutes and Transcript Electricity Advisory Committee Meeting, July 12, 2011 - Meeting Minutes and Transcript Meeting minutes and transcript for the July 12, 2011 meeting of the Electricity Advisory Committee. PDF icon EAC Meeting Minutes - July 12, 2011.pdf PDF icon EAC Meeting Transcript - July 12, 2011.pdf More Documents & Publications Electricity Advisory Committee Meeting, October 29, 2010: Transcript Electricity Advisory

  11. Asset Protection Analysis Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-21

    The Guide provides examples of the application of as set protection analysis to several common problems. Canceled by DOE N 251.80.

  12. Unveiling the Implementation Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge National Laboratory www.ornl.gov Unveiling the Implementation Guide October 11, 2011 Michaela Martin Program Manager Residential, Commercial, and Industrial Energy ...

  13. Precision guided antiaircraft munition

    DOE Patents [OSTI]

    Hirschfeld, Tomas B. (Livermore, CA)

    1987-01-01

    A small diameter, 20 mm to 50 mm, guided projectile is used in antiaircraft defense. A pulsing laser designator illuminates the target aircraft. Energy reflected from the aircraft is received by the guided projectile. The guided projectile is fired from a standard weapon but the spining caused by the riflings are removed before active tracking and guidance occurs. The received energy is focused by immersion optics onto a bridge cell. AC coupling and gating removes background and allows steering signals to move extended vanes by means of piezoelectric actuators in the rear of the guided projectile.

  14. Work for Others Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-09-24

    The Guide has been developed to assist Operations/Field Offices in developing their local WFO processes. Does not cancel/supersede other directives.

  15. WORLD EDITOR TRAINING GUIDE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... World Editor Training Guide April 2013 ii . ... several components, this class focuses on using the World ... red, but they should be black until the cable connects. ...

  16. DOE G 414.1-4, Safety Software Guide for Use with 10 CFR 830...

    Office of Environmental Management (EM)

    G 414.1-4, Safety Software Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance DOE G 414.1-4, Safety Software Guide for Use...

  17. Order Module--SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    guides, DOE G 414.1-3, SuspectCounterfeit Items Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1B, Quality Assurance, DOE G 414.1-4, ...

  18. Revised DOE Acquisition Guide Chapter 42.1 Indirect Rate Administration (October 2010)

    Broader source: Energy.gov [DOE]

    The Office of Procurement and Assistant Management (OPAM) has issued the above Acquisition Guide Chapter. DOE Acquisition Guide Chapter 42.1 Indirect Rate Administration has been revised to provide the current references and requirements.

  19. Offshore Resource Assessment and Design Conditions Public Meeting Summary Report

    SciTech Connect (OSTI)

    none,

    2011-09-01

    The Department of Energy's Wind and Water Power Program hosted a public meeting in June 2011 that focused on the critical meteorological and oceanographic measurements and data needed for successful deployment of offshore renewable energy technologies, including wind and marine and hydrokinetic. The objective was to develop a tactical plan to guide future program investments in filling possible information gaps.

  20. Users Meetings | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2015 Users Meeting 2014 Users Meeting 2013 Users Meeting 2012 Users Meeting 2011 Users Meeting 2009 Users Meeting 2008 Users Meeting 2007 Users Meeting Workshops Photos Videos Career Opportunities CNM Intranet CNM on Facebook Career Opportunities CNM Intranet CNM on Facebook Argonne National Laboratory Center for Nanoscale Materials About Research Capabilities For Users People Publications News & Events News & Events RESEARCH HIGHLIGHTS COLLOQUIUM SERIES SEMINAR SERIES Argonne Press

  1. URTAC Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meetings URTAC Meetings November 27, 2013 URTAC Meeting - December 18, 2013 November 18, 2013 URTAC Meeting - December 4, 2013 October 2, 2013 URTAC Meeting - October 2013 Federal Register Notice for October 10, 2013 URTAC Meeting The 24th Meeting of the Unconventional Resources Technology Advisory Committee (URTAC), previously scheduled for October 10, 2013, is postponed until further notice due to a lapse in Federal funding. September 19, 2013 URTAC Meeting - September 19, 2013 September 19,

  2. EERE Program Management Guide- About the Program Management Guide

    Broader source: Energy.gov [DOE]

    The Introduction describes the need for an Operator’s Guide, provides information on content and the relationship between the guide and the EERE Program Management Initiative, and provides information on how to use the guide.

  3. Kuda Training Guide_053013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kuda Training Guide_053013 Kuda Training Guide_053013 PDF icon Kuda TrainingGuide_053013.pdf More Documents & Publications NTERTraining Guides Energy Walkabout FY13 Budget Resources

  4. DOE Acquisition Guide Chapter 23 | Department of Energy

    Office of Environmental Management (EM)

    23 DOE Acquisition Guide Chapter 23 The purpose of this flash is to provide you an updated copy of the DOE Acquisition Guide Chapter 23. The Chapter has been updated to reflect the more recent requirements of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance which updates Executive Order 13423. PDF icon PF2010-83 DOE Acquisition Guide Chapter 23 PDF icon PF2010-83a.pdf More Documents & Publications Chapter 23 - Environment, Energy and Water

  5. UDAC Meeting - January 2012 | Department of Energy

    Energy Savers [EERE]

    Minutes from January 19, 2012 UDAC Meeting (17th Meeting) PDF icon Minutes from January 19, 2012 UDAC Meeting (17th Meeting) More Documents & Publications UDAC Meeting - September 2012 UDAC Meeting - September 2013 UDAC Meeting - February 2011

  6. URTAC Meeting - January 2012 | Department of Energy

    Energy Savers [EERE]

    January 2012 URTAC Meeting - January 2012 Meeting minutes from January 2012 meeting PDF icon URTAC - Minutes for January 19, 2012 Meeting More Documents & Publications URTAC Meeting - September 2010 URTAC Meeting - September 19, 2013 URTAC Meeting - September

  7. Meeting of the Electricity Advisory Committee Meeting, September 29-30, 2015- Meeting Minutes and Transcripts

    Broader source: Energy.gov [DOE]

    Meeting minutes and transcripts for the September 29-30, 2015 meeting of the Electric Advisory Committee.

  8. Tritium Focus Group Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fall 2015 Tritium Focus Group Meeting November 3 - 5, 2015 Meeting location: J.R. Oppenheimer Study Center TA 3, Building 207, Main Floor Technical Area 3 Map (pdf) Directions via Google Maps Meeting Information Tritium Focus Group Charter (pdf) Hotel Information Classified Session Information Los Alamos Restaurants (pdf) LANL Information Visting Los Alamos Area Map Weather Contacts Mike Rogers (505) 665-2513 mrogers@lanl.gov Chandra Savage Marsden (505) 664-0183 chandra@lanl.gov

  9. STEAB October Meeting Minutes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STEAB October 2015 Meeting October 6-7, 2015 Renaissance Washington, DC Dupont Circle Hotel Washington, DC OCTOBER MEETING ATTENDEES Designated Federal Officer (DFO):  Michael Li, DFO, EERE, DOE. STEAB MEETING ATTENDANCE BOARD MEMBERS Present Absent Jeff Ackermann, Director, Colorado Energy Office X Roger Berliner, Council President, Montgomery County Council X Susan Brown, Deputy Administrator, Wisconsin Division of Energy X Tom Carey, Director, Energy and Rehabilitation Programs, New York

  10. 2015 CAMD Users Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CAMD 2015 Symposium followed by the CAMD Users' Meeting SAXS Workshop Thursday, April 23th, 2015 CAMD, 6980 Jefferson Highway, Baton Rouge, LA 70806 CAMD 2015 Symposium followed by the CAMD Users' Meeting Friday, April 24th, 2015 LTRC Transportation Training and Education Center (Map) The CAMD 2015 Symposium followed by the CAMD Users' Meeting will be held on Friday, April 24th at the LTRC Transportation Training and Education Center, 4099 Gourrier Avenue, Baton Rouge, LA 70808, directly behind

  11. Meetings & Minutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meeting Materials: December 6, 2012 Meeting Materials: December 6, 2012 L'Enfant Plaza Hotel Quorum Room, (Main Floor) Washington, D.C. 20024 PDF icon Meeting Agenda PDF icon Presentation: Current Event by Dr. Pete Lyons PDF icon Presentation: Research Results From Low Dose Radiation Program by Dr. Noelle Metting PDF icon Presentation: Million U.S. Worker Study by Dr. John Boice PDF icon Presentation: Fuel Cycle Research and Development Report by Dr. Burton Richter PDF icon Presentation: NEAMS

  12. 2011 User Meeting Agenda

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agenda Home Agenda Awards Exhibitors Lodging Posters Registration Photo Contest Transportation Workshops This e-mail address is being protected from spambots. You need JavaScript enabled to view it User Meeting Archives Users' Executive Committee The 2011 ALS User Meeting begins registation begins at 07:30 on Monday, October 3, outside the Building 50 Auditorium. The meeting itself will start at 08:25 inside the Building 50 Auditorium; all plenary sessions will also be held at this location.

  13. STEAB January Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    JANUARY MEETING AGENDA January 13 - 14, 2015 Renaissance Washington DC Dupont Circle Hotel ... 13 - 14, 2015 Renaissance Washington DC Dupont Circle Hotel 1143 New Hampshire Ave, NW, ...

  14. Nuclear Physics: Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Topics: Meetings Talks given at the Science & Technology Review 2004 Larry Cardman: Science Overview and the Experimental Program ppt | pdf Tony Thomas: Nuclear Physics ...

  15. OPSI Annual Meeting

    Broader source: Energy.gov [DOE]

    The Organization of PJM States, Inc. (OPSI) is hosting its annual meeting in Chicago, IL, on October 13-14, 2014.

  16. Past Meetings and Workshops

    Broader source: Energy.gov [DOE]

    This page archives past meetings where Bioenergy Technologies Office staff have participated and includes copies of the presentations shared at each event.

  17. ARM - Meetings and Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Meeting AOGS Beijing, China Asia Oceania Geosciences ... fundamental characteristics of weather and climate systems. ... Conference on Big Data IEEE BigData 2016 ...

  18. CEE Winter Program Meeting

    Broader source: Energy.gov [DOE]

    Consortium for Energy Efficiency (CEE) is hosting their Winter Program Meeting, a two-day conference held in Long Beach, California.

  19. CEE Winter Program Meeting

    Broader source: Energy.gov [DOE]

    The Consortium for Energy Efficiency (CEE) is hosting its winter program meeting to work together and define market interventions that increase energy efficiency.

  20. ARM - Meet Our Friends

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox ...

  1. STGWG Meeting- May 2009

    Broader source: Energy.gov [DOE]

    State and Tribal Government Working GroupSpring Meeting NotesWestin Arlington GatewayArlington, VirginiaMay 27, 2009 

  2. ARM - Meetings and Presentations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    R. Williams 2009 Science Team Meeting Midlatitude Continental Convective Cloud Experiment (MC3E) (PDF, 531K) Michael Jensen, Pavlos Kollias, Anthony Del Genio, Scott Giangrande...

  3. SPE Western Regional Meeting

    Broader source: Energy.gov (indexed) [DOE]

    Hydrates Advisory Committee Meeting Program Funding Louis Capitanio Methane Hydrate Program Manager Office of Oil and Natural Gas June 7, 2013 FY 2012 & FY 2013 Budgets FY 2012...

  4. ORSSAB monthly board meeting

    Broader source: Energy.gov [DOE]

    The ORSSAB monthly board meeting is open to the public. This month, participants will receive an updateon the U-233 Project.

  5. ORSSAB Monthly Board Meeting

    Broader source: Energy.gov [DOE]

    The ORSSAB monthly board meetingis open to the public. The board will receive an update on the Transuranic Waste Processing Center.

  6. Meetings and Workshops

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exchange Program Surplus Power Sales Reports Meetings and Workshops January 21, 2016 Generation Inputs Workshop Location, time and call-in information Materials to be posted...

  7. Quadrennial Energy Review Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    aging infrastructure, load growth, increased need for storm ... being examined is the concept of the utility, or other ... operations to achieve the optimal means for meeting customer ...

  8. ORSSAB Monthly Board Meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ORSSAB MonthlyBoard meeting is open to the public. This month, participants will be briefed on the East Tennessee Technology Park Zone 1 Soils Proposed Plan.

  9. ORSSAB Montly Meeting

    Broader source: Energy.gov [DOE]

    This meeting is open to the public, and the board will discuss the Oak Ridge Environmental Management program's FY 2016 budget and prioritization.

  10. CEE Summer Program Meeting

    Broader source: Energy.gov [DOE]

    The Consortium for Energy Efficiency (CEE) is hosting the Summer Program Meeting to cover market transformation to accelerate uptake of efficient goods and services.

  11. Energy Innovations DOE Meeting

    Broader source: Energy.gov [DOE]

    Leo Breton, representing Energy Innovations of Washington, DC, a small company engaged in improving the energy efficiency of appliances, automobiles, and HVAC systems, requested a meeting with DOE...

  12. Scenario Analysis Meeting

    Broader source: Energy.gov [DOE]

    Presentation by Sigmund Gronich at the 2010-2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles and Infrastructure meeting on January 31, 2007.

  13. OPSI Annual Meeting

    Broader source: Energy.gov [DOE]

    The Organization of PJM States, Inc. (OPSI) is hosting its annual meeting with sessions covering clean power, gas and electric coordination, and more.

  14. 2012 User Meeting Workshops

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workshops Print 2012 ALS User Meeting Workshops Home Agenda Awards Exhibitors Lodging Posters Registration Transportation Workshops This e-mail address is being protected from...

  15. 2012 User Meeting Agenda

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 User Meeting Agenda Print Agenda Home Agenda Awards Exhibitors Lodging Posters Registration Transportation Workshops This e-mail address is being protected from spambots. You...

  16. ORSSAB monthly board meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    Board members and participants will hear a presentation and updates about the "Oak Ridge ReservationGroundwater Strategic Plan." The meeting is open to the public.

  17. ORSSAB monthly board meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    Board members and participants will hear a presentation and updates about "Sufficient Waste Disposal Capacity on the Oak Ridge Reservation." The meeting is open to the public.

  18. Suspect/Counterfeit Items Information Guide for Subcontractors/Suppliers

    SciTech Connect (OSTI)

    Tessmar, Nancy D.; Salazar, Michael J.

    2012-09-18

    Counterfeiting of industrial and commercial grade items is an international problem that places worker safety, program objectives, expensive equipment, and security at risk. In order to prevent the introduction of Suspect/Counterfeit Items (S/CI), this information sheet is being made available as a guide to assist in the implementation of S/CI awareness and controls, in conjunction with subcontractor's/supplier's quality assurance programs. When it comes to counterfeit goods, including industrial materials, items, and equipment, no market is immune. Some manufactures have been known to misrepresent their products and intentionally use inferior materials and processes to manufacture substandard items, whose properties can significantly cart from established standards and specifications. These substandard items termed by the Department of Energy (DOE) as S/CI, pose immediate and potential threats to the safety of DOE and contractor workers, the public, and the environment. Failure of certain systems and processes caused by an S/CI could also have national security implications at Los Alamos National Laboratory (LANL). Nuclear Safety Rules (federal Laws), DOE Orders, and other regulations set forth requirements for DOE contractors to implement effective controls to assure that items and services meet specified requirements. This includes techniques to implement and thereby minimizing the potential threat of entry of S/CI to LANL. As a qualified supplier of goods or services to the LANL, your company will be required to establish and maintain effective controls to prevent the introduction of S/CI to LANL. This will require that your company warrant that all items (including their subassemblies, components, and parts) sold to LANL are genuine (i.e. not counterfeit), new, and unused, and conform to the requirements of the LANL purchase orders/contracts unless otherwise approved in writing to the Los Alamos National Security (LANS) contract administrator/procurements specialist.

  19. Department of Energy (DOE) Acquisition Guide

    Broader source: Energy.gov [DOE]

    Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition Guide serves this purpose by identifying relevant internal standard operating procedures to be followed by both procurement and program personnel who are involved in various aspects of the acquisition process. The Guide also is intended to be a repository of best practices found throughout the agency that reflect specific illustrations of techniques which ' might be helpful to all readers. Additionally, the Guide includes subject matter that was issued previously through other media, such as Acquisition Letters.

  20. Processing an Order or Guide - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Breadcrumb >> Breadcrumb Processing an Order or Guide by Website Administrator Text version available here Document Actions Justification Memorandum Initial Draft Coordination: Review & Comment Coordination: Comment Resolution Coordination: For Informational Purposes Only Final Review and Approval Impasse Publication Justification Memorandum (Initial step towards developing a Order or Guide) Office of Primary Interest (OPI) Creates a justification memorandum for

  1. Economic Evaluation Guide for alternative transportation fuels

    SciTech Connect (OSTI)

    de Percin, D.; Werner, J.F. Jr.

    1992-12-31

    The production of this Economic Evaluation Guide is one activity of AVFCAP. The guide is intended for use by project managers and fleet operators in the public sector. Public fleets have been identified as one of the most likely areas where ATFs will first gain widespread use, because of existing and impending state and federal legislative mandates, as well as for practical reasons such as centralized servicing and refueling. The purpose of this guide is to provide balanced decision-support information to project managers who are considering conducting, or currently managing, ATF demonstration programs. Information for this guide was gathered as part of a related AVFCAP activity, the development of an Information Resource Database. Economic issues related to the development and implementation of ATF programs at the local government level are extremely complex, and require an analysis of federal policies and national and international economics that is generally beyond the scope of local government project managers. The intent of this guide is to examine the information available on the economic evaluation of ATFs, and identify key elements that will help local governments realistically assess the potential costs and savings of an ATF program. The guide also discusses how these various economic factors are related, and how local government priorities affect how different factors are weighed.

  2. Economic Evaluation Guide for alternative transportation fuels

    SciTech Connect (OSTI)

    de Percin, D.; Werner, J.F. Jr.

    1992-01-01

    The production of this Economic Evaluation Guide is one activity of AVFCAP. The guide is intended for use by project managers and fleet operators in the public sector. Public fleets have been identified as one of the most likely areas where ATFs will first gain widespread use, because of existing and impending state and federal legislative mandates, as well as for practical reasons such as centralized servicing and refueling. The purpose of this guide is to provide balanced decision-support information to project managers who are considering conducting, or currently managing, ATF demonstration programs. Information for this guide was gathered as part of a related AVFCAP activity, the development of an Information Resource Database. Economic issues related to the development and implementation of ATF programs at the local government level are extremely complex, and require an analysis of federal policies and national and international economics that is generally beyond the scope of local government project managers. The intent of this guide is to examine the information available on the economic evaluation of ATFs, and identify key elements that will help local governments realistically assess the potential costs and savings of an ATF program. The guide also discusses how these various economic factors are related, and how local government priorities affect how different factors are weighed.

  3. Salt Lake City- High Performance Buildings Requirement

    Broader source: Energy.gov [DOE]

    Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

  4. Guidance on Life-Cycle Cost Analysis Required by Executive Order 13123

    Broader source: Energy.gov [DOE]

    Guide describes the clarification of how agencies determine the life-cycle cost for investments required by Executive Order 13123.

  5. Revised Merit Review Guide for Financial Assistance, JULY 2013

    Broader source: Energy.gov [DOE]

    The Merit Review Guide for Financial Assistance along with Attachments 2 and 3 of the Guide have been revised. Revisions include correcting references to attachments and updating of the information presented in the Guide and Attachments to reflect the new requirements of the Whistleblower Protection Enhancement Act of 2012. The revised documents can be found at http://energy.gov/management/downloads/policy-flash-2013-38-revised-meri... and are labeled: Merit Review Guide FINAL JULY 2013, ATTACHMENT 2 Sample COI ADDED WB LANGUAGE JULY 2013.docx and ATTACHMENT 3 - Sample Evaluation and Selection Plan JULY 2013.docx.

  6. Meet with Large Businesses

    Energy Savers [EERE]

    Medication List - September 14, 2010 Medication List - September 14, 2010 September 14, 2010 This scale is created to provide a guide for the physician determination of ability to work for HRP certified persons with certain conditions and while taking certain medications. This scale is created to provide a guide for the physician determination of ability to work for HRP certified persons with certain conditions and while taking certain medications. This is meant to be a reference to induce some

  7. Introduction to the Emergency Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    The guide provides non-mandatory guidance for the implementation of the requirements pertaining to the DOE comprehensive EMS. Volume 1 is an introduction to the program. Canceled by DOE G 151.1-1A. Does not cancel other directives.

  8. Product Guide Product Guide Volumes Category Prices Table Crude...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    suppliers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -- 49 Product Guide Volumes Category Prices Table Energy Information Administration Petroleum...

  9. Product Guide Product Guide Volumes Category Prices Table Crude...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -- 49 Product Guide Volumes Category Prices Table Energy Information Administration Petroleum Marketing...

  10. Meeting Minutes from Automated Home Energy Management System Expert Meeting

    Energy Savers [EERE]

    Automated Home Energy Management System Expert Meeting October 1-2, 2009 AGENDA - Day 1 8:30 - 8:45 Welcome and Debriefing of Building America and Home Energy Management Research- Lew Pratsch, DOE 8:45 - 9:15 Utilities Trends- Smart Grid Projects and Integration With Home Controls - Mike Keesee, SMUD 9:15 - 9:45 Thoughts on Controls System Performance Requirements - Rich Brown, LBL 9:45 - 10:15 Efficiency Trends in Consumer Electronics - Kurtis McKenney, TIAX 10:15 - 10:30 Session Break 10:30 -

  11. OPAM Policy Acquisition Guides | Department of Energy

    Energy Savers [EERE]

    32 - Contract Financing OPAM Policy Acquisition Guides Microsoft Word - AcqGuide71pt1.doc

  12. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-12

    The purpose of this guide is to describe effective risk management processes. The continuous and iterative process includes updating project risk documents and the risk management plan and emphasizes implementation communication of the risks and actions taken.

  14. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The objective of this Guide is to improve the quality of cost estimates and further strengthen the DOE program/project management system. The original 25 separate chapters and three appendices have been combined to create a single document.

  15. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates.

  16. EERE Peer Review Guide

    SciTech Connect (OSTI)

    2009-01-18

    The primary purpose of this guide is to provide managers and staff guidance in establishing formal in-progress peer review that provides intellectually fair expert evaluation of EERE RD3 and supporting business administration programs, both retrospective and prospective.

  17. Study Guides and Activities

    Broader source: Energy.gov [DOE]

    Thank you for considering fossil energy education in your classroom curriculum. The U.S. Department of Energy's Office of Fossil Energy is excited to present printable study guides and activities...

  18. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  19. Technology Readiness Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-15

    The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Supersedes DOE G 413.3-4.

  20. Security guide for subcontractors

    SciTech Connect (OSTI)

    Adams, R.C.

    1991-01-01

    This security guide of the Department of Energy covers contractor and subcontractor access to DOE and Mound facilities. The topics of the security guide include responsibilities, physical barriers, personnel identification system, personnel and vehicular access controls, classified document control, protecting classified matter in use, storing classified matter repository combinations, violations, security education clearance terminations, security infractions, classified information nondisclosure agreement, personnel security clearances, visitor control, travel to communist-controlled or sensitive countries, shipment security, and surreptitious listening devices.

  1. VOLTTRON: User Guide

    SciTech Connect (OSTI)

    Lutes, Robert G.; Katipamula, Srinivas; Akyol, Bora A.; Tenney, Nathan D.; Haack, Jereme N.; Monson, Kyle E.; Carpenter, Brandon J.

    2014-04-24

    This document is a user guide for the deployment of the Transactional Network platform and agent/application development within the VOLTTRON. The intent of this user guide is to provide a description of the functionality of the Transactional Network Platform. This document describes how to deploy the platform, including installation, use, guidance, and limitations. It also describes how additional features can be added to enhance its current functionality.

  2. EIA Writing Style Guide

    Gasoline and Diesel Fuel Update (EIA)

    Writing Style Guide April 2015 U.S. Energy Information Administration Office of Communications This publication is available on the EIA employee intranet and at: www.eia.gov/eiawritingstyleguide.pdf U.S. government publications are not subject to copyright protection, but you should acknowledge EIA as the source if you use or reproduce this content. Contents Introduction to the EIA Writing Style Guide ........................................................................ Chapter 1: Editorial

  3. Corrective Action Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-02

    This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

  4. Control system design guide

    SciTech Connect (OSTI)

    Sellers, David; Friedman, Hannah; Haasl, Tudi; Bourassa, Norman; Piette, Mary Ann

    2003-05-01

    The ''Control System Design Guide'' (Design Guide) provides methods and recommendations for the control system design process and control point selection and installation. Control systems are often the most problematic system in a building. A good design process that takes into account maintenance, operation, and commissioning can lead to a smoothly operating and efficient building. To this end, the Design Guide provides a toolbox of templates for improving control system design and specification. HVAC designers are the primary audience for the Design Guide. The control design process it presents will help produce well-designed control systems that achieve efficient and robust operation. The spreadsheet examples for control valve schedules, damper schedules, and points lists can streamline the use of the control system design concepts set forth in the Design Guide by providing convenient starting points from which designers can build. Although each reader brings their own unique questions to the text, the Design Guide contains information that designers, commissioning providers, operators, and owners will find useful.

  5. Colorado State Land Board Land Survey Requirements | Open Energy...

    Open Energy Info (EERE)

    Colorado State Land Board Land Survey Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Colorado...

  6. Meeting Attendance - 34th Tritium Focus Group Meeting | Department of

    Office of Environmental Management (EM)

    Energy 4th Tritium Focus Group Meeting Meeting Attendance - 34th Tritium Focus Group Meeting Attendees to the 34th Tritium Focus Group Meeting held in Idaho Falls, ID on September 23-25, 2014. PDF icon Meeting Attendance - 34th Tritium Focus Group Meeting More Documents & Publications Technological Assessment of Plasma Facing Components for DEMO Reactors Overview of tritium activity in Japan

  7. Guide to preparing SAND Reports and other communication products.

    SciTech Connect (OSTI)

    Not Available

    2009-02-01

    This guide describes the R&A process, Common Look and Feel requirements, and preparation and publishing procedures for communication products at Sandia National Laboratories. Samples of forms and examples of published communications products are provided.

  8. Issue a New Department of Energy Acquisition Guide Chapter 6...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6.1 and 7.1. PDF icon PF2011-40 Issue a New AG 6.5 Competition Advocate Responsibilities ... Guide Chapter 6.1 - Competition Requirements Microsoft Word - AG Chapter 6 1 Nov 2010

  9. Achieving 50% Energy Savings in Office Buildings, Advanced Energy Design Guides: Office Buildings (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    This fact sheet summarizes recommendations for designing new office buildings that result in 50% less energy use than conventional designs meeting minimum code requirements. The recommendations are drawn from the Advanced Energy Design Guide for Small to Medium Office Buildings, an ASHRAE publication that provides comprehensive recommendations for designing low-energy-use office buildings with gross floor areas up to 100,000 ft2 (see sidebar). Designed as a stand-alone document, this fact sheet provides key principles and a set of prescriptive design recommendations appropriate for smaller office buildings with insufficient budgets to fully implement best practices for integrated design and optimized performance. The recommendations have undergone a thorough analysis and review process through ASHRAE, and have been deemed the best combination of measures to achieve 50% savings in the greatest number of office buildings.

  10. Vehicle Technologies Office Merit Review 2015: ICME Guided Development of Advanced Cast Aluminum Alloys for Automotive Engine Applications

    Broader source: Energy.gov [DOE]

    Presentation given by Ford Motor Company at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about ICME guided development of...

  11. Vehicle Technologies Office Merit Review 2014: ICME Guided Development of Advanced Cast Aluminum Alloys For Automotive Engine Applications

    Broader source: Energy.gov [DOE]

    Presentation given by Ford at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about ICME guided development of advanced cast...

  12. NUG Annual Meetings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NUGEX Elections Charter User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home » For Users » NERSC Users Group » Annual Meetings NUG Annual Meetings NUG holds annual face-to-face meetings. The annual

  13. CASL Industry Council Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 CASL Industry Council Meeting March 26-27, 2013 - Cranberry Township, PA Minutes The sixth meeting of the Industry Council (IC) for the Consortium for Advanced Simulation of Light Water Reactors (CASL) was held on March 26-27, 2013 at Westinghouse in Cranberry Township, PA. The first day of the Industry Council was chaired by John Gaertner and the second day was chaired by Heather Feldman. The meeting attendees and their affiliations are listed on Attachment 1 to these minutes. Attendance was

  14. Meeting and Presentation Materials

    Office of Environmental Management (EM)

    TH EM QUALITY ASSURANCE CORPORATE BOARD MEETING Meeting Location: Richland, WA - Office of River Protection Room: 2440 Stevens Center - Room 2311 Agenda for November 27, 2012 12:30-12:40 Introductions/Status of Actions from the Last Meeting Larry Perkins (EM-43) 12:40-1:10 Status/Closure of Current Focus Areas * Focus Area 2 (Resources) * Focus Area 3 (Training) Jim Davis (EM-43) Ken Armstrong (EMCBC) 1:10-2:10 EM QA Corporate Board Approach and Focus Matt Moury (EM-40) Bob Murray (EM-43)

  15. Meetings & Minutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2012 NSSAB Meetings Join Us at a NSSAB Meeting! All NSSAB Full Board meetings are open to the public. Date Type Time Location Agenda Handouts Minutes Oct 4, 2011 SWEIS Committee 2 pm DOE Nevada Support Facility 232 Energy Way (Sedan Room) Las Vegas, NV 89030 Agenda N/A Minutes Oct 12, 2011 Full Board 5 pm Las Vegas Country Club 3000 Joe W. Brown Blvd Las Vegas, NV 89109 Agenda Handouts Minutes Nov 9, 2011 Membership Committee 3 pm Frank H. Rogers Building 755 E. Flamingo Rd Las

  16. Meetings & Minutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2013 NSSAB Meetings Join Us at a NSSAB Meeting! All NSSAB Full Board meetings are open to the public. Date Type Time Location Agenda Handouts Minutes Oct 10, 2012 Orientation 1 pm â€" 6 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda Handouts N/A Nov 14, 2012 NNSS Tour for Members Full Day Nevada National Security Site N/A Handouts N/A Nov 26, 2012 Membership Committee 3 p.m. West Career and Technical Academy West Charleston Blvd NV 89135 Agenda

  17. Meetings & Minutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2014 NSSAB Meetings Join Us at a NSSAB Meeting! All NSSAB Full Board meetings are open to the public. Date Type Time Location Agenda Handouts Minutes Oct 2, 2013 Orientation 1 pm â€" 6 pm Sahara West Library 9600 West Sahara Road Las Vegas, NV 89117 Agenda Handouts N/A Nov 20, 2013 Educational Session, “Cultural Resources and American Indian Consultation at the NNSSâ€? 4 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 N/A Handouts N/A Nov 20, 2013

  18. Meetings & Minutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2015 NSSAB Meetings Join Us at a NSSAB Meeting! All NSSAB Full Board meetings are open to the public. Date Type Time Location Agenda Handouts Minutes Oct 8, 2014 Orientation 1 pm â€" 6 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda Handouts N/A Oct 29, 2014 NNSS Tour for Members Full Day Nevada National Security Site N/A Handouts N/A Nov 19, 2014 Educational Session, “Environmental Report Overview" 4 pm Frank H. Rogers Building 755 E.

  19. Meetings & Minutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2016 NSSAB Meetings Join Us at a NSSAB Meeting! All NSSAB Full Board meetings are open to the public. Date Type Time Location Agenda Handouts Minutes Oct 15, 2015 NNSS Tour for Members Full Day Nevada National Security Site N/A Handouts N/A Nov 10, 2015 Educational Session, "Water Levels 101" 4 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 N/A Handouts N/A Nov 10, 2015 Full Board 5 p.m. Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119

  20. Slice Product Review Meeting Materials (rd/meetings)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Slice Product Review Meeting Materials (updated January 31, 2006) September 15, 2005 - Kick-off Meeting September 9 Announcement Letter (PDF, 1 page, 30 KB, posted September 9,...

  1. Joint Meeting on Hydrogen Delivery Modeling and Analysis Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Documents & Publications Hydrogen Delivery Analysis Models Hydrogen Delivery Analysis Plus Meeting: DTT, STT, HPTT, Other Analysts, Invited Guests Joint Meeting on Hydrogen...

  2. Sealed Radioactive Source Accountability and Control Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-04-15

    For use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection. This Guide provides an acceptable methodology for establishing and operating a sealed radioactive source accountability and control program that will comply with U.S. Department of Energy (DOE) requirements specified in Title 10 of the Code of Federal Regulations (CFR), Part 835, Occupational Radiation Protection (DOE 1998a), hereinafter referred to as 10 CFR 835. In particular, this Guide provides guidance for achieving compliance with subpart M of 10 CFR 835. Canceled by DOE G 441.1-1B.

  3. Revised Department of Energy (DOE) Acquisition Guide Chapter 7.2 Strategic

    Office of Environmental Management (EM)

    Sourcing Requirements | Department of Energy Department of Energy (DOE) Acquisition Guide Chapter 7.2 Strategic Sourcing Requirements Revised Department of Energy (DOE) Acquisition Guide Chapter 7.2 Strategic Sourcing Requirements DOE Acquisition Guide Chapter 7.2 has been revised to incorporate recent guidance from the following: Policy Flash 2014-18 dated February 26, 2014, Complex-Wide Strategic Sourcing - Update Policy Flash 2014-16 dated February 12, 2014, Standardized Cost Savings

  4. URTAC Meeting - March 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2012 URTAC Meeting - March 2012 Minutes from March 2012 URTAC Meeting PDF icon URTAC - Minutes for March 8, 2012 Meeting More Documents & Publications URTAC Meeting - October 22, 2009 URTAC Meeting - October 2011 UDAC Meeting - March

  5. UDAC Meeting - March 2012 | Department of Energy

    Energy Savers [EERE]

    1, 2012 UDAC Meeting (18th Meeting) PDF icon Minutes from March 1, 2012 UDAC Meeting (18th Meeting) More Documents & Publications URTAC Meeting - January 2012 URTAC Meeting - February 2012 Recommendations: Draft 2012 Annual Plan

  6. UDAC Meeting - September 2013 | Department of Energy

    Energy Savers [EERE]

    3 UDAC Meeting - September 2013 Federal Register Notice for September 17, 2013 UDAC Meeting PDF icon UDAC - Federal Register Notice for September 17, 2013 Meeting More Documents & Publications URTAC Meeting - September 2013 UDAC Meeting - October 2012 UDAC Meeting - January

  7. URTAC Meeting - February 2012 | Department of Energy

    Energy Savers [EERE]

    Meeting - February 2012 URTAC Meeting - February 2012 Minutes from February 2012 Meeting PDF icon URTAC - Minutes for February 28-29, 2012 Meeting More Documents & Publications URTAC Meeting - January 2012 URTAC Meeting - December 18, 2013 Recommendations: Draft 2012

  8. FTCP Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FTCP Face to Face Meeting - March 30, 2010 Meeting hosted by FTCP Chair and FTCP Deputy Chair with FTCP Agents and other FTCP personnel in attendance. Meetings consisted of FAQ...

  9. meeting | OpenEI Community

    Open Energy Info (EERE)

    Contributor 6 September, 2012 - 08:51 GRR Update Meeting scheduled for 913 in D.C. D.C. GRR meeting update The next Geothermal Regulatory Roadmap update meeting will be...

  10. National Hydrogen Vision Meeting Proceedings

    Fuel Cell Technologies Publication and Product Library (EERE)

    This document provides presentations and summaries of the notes from the National Hydrogen Vision Meeting''s facilitated breakout sessions. The Vision Meeting, which took place November 15-16, 2001, k

  11. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 3, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITTEE September 3, 2014 Pasco, WA Topics in this Meeting Summary Welcome ....................................................................................................................................................... 1 PIC Role Framing ......................................................................................................................................... 1 State of the Site Meetings

  12. Department of Energy (DOE) Acquisition Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE) Acquisition Guide Department of Energy (DOE) Acquisition Guide Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition

  13. Spring 2014 National Transportation Stakeholder Forum Meeting...

    Energy Savers [EERE]

    Transportation Stakeholder Forum Meeting, Minnesota Spring 2014 National Transportation Stakeholder Forum Meeting, Minnesota NTSF 2014 Meeting Agenda PRESENTATIONS - MAY 13, ...

  14. ORSSAB monthly board meeting

    Broader source: Energy.gov [DOE]

    The Oak Ridge Site Specific Advisory Board's monthly meeting is open to the public. The presentation and dicussion this month will focus on "Technology Development to Support Mercury Cleanup...

  15. ORSSAB monthly meeting

    Broader source: Energy.gov [DOE]

    The ORSSAB monthly meeting is open to the public. This month, participants will receive an update and breifing about the EM Disposal Facility from the Oak Ridge Office of Environmental Managment.

  16. ORSSAB monthly board meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ORSSAB monthly board meeting is open to the public. The board will hear a presentation and discuss the development of a comprehensive mercury strategy for the Oak Ridge Reservation.

  17. RAP Meeting Transcribed Flipcharts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 9, 2012 NRDA IAP - Next Steps November Board meeting update, notice of comment period 20 minute presentation Outline of Plan o Final Plan by mid-January 2013...

  18. NARUC Winter Committee Meetings

    Broader source: Energy.gov [DOE]

    The National Association of Regulatory Utilities Commissioners (NARUC) Winter Committee Meetings offers its members and attendees the latest information from U.S. federal policymakers, consumer advocates, industry officials, and other stakeholders.

  19. ORSSAB monthly board meeting

    Broader source: Energy.gov [DOE]

    The ORSSAB monthly board meeting is open to the public. The board will receive an update on the Community Reuse Organization of East Tennessee efforts at the East Tennessee Technology Park.

  20. NARUC Summer Committee Meeting

    Broader source: Energy.gov [DOE]

    The National Association of Regulatory Utility Commissioners (NARUC) is hosting their Summer Committee Meeting in New York City. Attendees will learn the latest in regulatory trends and sharing best practices.

  1. Meet the CAMS Staff

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meet the CAMS Staff Members of the CAMS staff standing near the 10 MV Tandem Van de Graaff Accelerator at CAMS, Lawrence Livermore National Laboratory. Members of the CAMS staff...

  2. ORSSAB Monthly Board Meeting

    Broader source: Energy.gov [DOE]

    The September meeting will include a briefing on the DOE Oak Ridge Geographical Information System, the land use manager, and the Oak Ridge Environmental Information System, their functions,and...

  3. ORSSAB monthly board meeting

    Broader source: Energy.gov [DOE]

    The ORSSAB monthly meetingis open to the public. This month the board will hear a presentation and discussthe FY 2016Oak Ridge Officeof Environmental Management's budget and prioritization.

  4. ARM - Meetings and Presentations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Steering Committee AMIE-MANUS Proposal Abstract AMIE-GAN Proposal Abstract Meetings Cloud Life Cycle Working Group Deployment Operations Science Plan - TWP Manus Site (PDF, 2.1 MB)...

  5. Meetings and Workshops

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    China New Advances in Optical Imaging of Live Cells and Organisms Print http:csh-asia.com13image.html August 20-23, 2913; Suzhou, China 28th Meeting of the European...

  6. ORSSAB monthly board meeting

    Broader source: Energy.gov [DOE]

    Board members and participants will hear a presentation and updates about the "Y-12 Mercury Cleanup Strategy and Plan for a Y-12 Water Treatment Plant." The meeting is open to the public.

  7. ORSSAB monthly board meeting

    Broader source: Energy.gov [DOE]

    The ORSSAB monthly meeting is open to the public. This month, participants will receive an update and breifing about the FY 2018 Budget Formulation and Prioritization of Projects from the Oak Ridge...

  8. ORSSAB monthly board meeting

    Broader source: Energy.gov [DOE]

    The ORSSAB monthly meeting is open to the public. This month, participants will receive an update and breifing about the Groundwater Monitoring Program from the Oak Ridge Office of Environmental...

  9. NARUC Annual Meeting

    Broader source: Energy.gov [DOE]

    The National Association of Regulatory Utility Commissioneers (NARUC) is hosting its annual meeting in San Fransisco, CA, from Nov. 16-19, 2014. Registration and housing begins Aug. 27. 

  10. ORSSAB monthly board meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    Board members and participants will hear a presentation and updates about the "Selection of a Remediation Strategy for Trench 13 in Melton Valley." The meeting is open to the public.

  11. ORSSAB monthly board meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    Board members and participants will hear a presentation and updates about the "State of the Oak Ridge EM Program/FY 2016 Budget and Prioritization Planning." The meeting is open to the public.

  12. Ozone contactor hydraulic considerations in meeting CT disinfection

    Office of Scientific and Technical Information (OSTI)

    requirements (Journal Article) | SciTech Connect Ozone contactor hydraulic considerations in meeting CT disinfection requirements Citation Details In-Document Search Title: Ozone contactor hydraulic considerations in meeting CT disinfection requirements Tracer studies were performed in bench and pilot scale ozone diffusion contactors to determine actual contact times for the bench and pilot scale units and to characterize the flow pattern through these reactors. It was recognized that the

  13. Global Bioenergy Partnership Meetings

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bioenergy Technologies Office Sustainability Technology Manager Kristen Johnson represented the Office at the Global Bioenergy Partnership (GBEP) Meetings in Rome, Italy. The event included three meetings, the 7th annual GBEP Working Group on Capacity Building, the 13th annual Task Force on Sustainability to discuss the experiences with the GBEP Sustainability Indicators for Bioenergy, and the 18th annual GBEP Steering Committee to discuss strategies for sustainable bioenergy development and deployment.

  14. 2013 User Meeting Awards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 User Meeting Awards Recipients of the 2013 Users' Executive Committee awards and the Student Poster Competition awards, were presented Tuesday, October 8, at the ALS User Meeting. David A. Shirley Award for Outstanding Scientific Achievement at the ALS 2013-shirley The David A. Shirley Award for Scientific Achievement went to Harald Ade, North Carolina State University, "For achievements in polymer science and in particular the elucidation of the chemical nano-morphology of complex

  15. Meeting and Presentation Materials

    Office of Environmental Management (EM)

    MEETING Knoxville, Tennessee August 27-28, 2009 Key Workshop Objectives: 1. Provide Board Members a Summary of Actions Accomplished since the last Corporate Board Meeting in March 2009. 2. Review and Discuss the EM/EFCOG Quality Assurance Improvement Project Action Plan Focus Areas' Progress and Completed Deliverables. 3. Obtain industry and DOE perspectives on concerns and lessons learned pertaining to Counterfeit, Suspect, and Fraudulent Items and Commercial Grade Dedication. Desired Outcomes:

  16. Meeting and Presentation Materials

    Office of Environmental Management (EM)

    QUALITY ASSURANCE CORPORATE BOARD MEETING Denver, Colorado July 29 -30, 2008 Key Workshop Objectives: 1. Inform Board Members of Ongoing and Future EM QA Initiatives. 2. Review and Discuss the Draft EM/EFCOG Project Action Plan for the Top Five Priority Issues Identified by Site Federal and Contractor Executives in 1 st EM QA Board Meeting in March 2008. 3. Brief and Discuss with Board Members the Proposed EM Corporate Performance Metrics System Concept and Approach. 4. Review the Progress of EM

  17. Meeting and Presentation Materials

    Office of Environmental Management (EM)

    QUALITY ASSURANCE CORPORATE BOARD MEETING Augusta, Georgia March 19, 2009 Key Workshop Objectives: 1. Provide Board Members a Summary of Actions Accomplished since the last Corporate Board Meeting in November 2008. 2. Review and Discuss the EM/EFCOG Project Action Plan Working Groups' Progress and Completed Deliverables. 3. Provide Briefings on Quality Assurance Lessons Learned for Discussion. Desired Outcomes: 1. Board Members Vote on EM/EFCOG Quality Assurance Improvement Initiative Project

  18. Meeting and Presentation Materials

    Office of Environmental Management (EM)

    EM QUALITY ASSURANCE CORPORATE BOARD MEETING Atlanta, Georgia November 13 -14, 2008 Key Workshop Objectives: 1. Provide Board Members an Overview and Progress Accomplished with Actions from the 2 nd Corporate Board Meeting on July 29-20, 2008. 2. Review and Discuss the EM/EFCOG Project Action Plan Working Groups' Progress and Completed Deliverables. 3. Provide Briefings on Quality Assurance Lessons Learned for Discussion. 4. Discuss with Board Members the Results and Lessons Learned of the EM QA

  19. Metering Best Practices. A Guide to Achieving Utility Resource Efficiency, Release 3.0

    SciTech Connect (OSTI)

    Parker, Steven A.; Hunt, W. D.; McMordie Stoughton, Kate; Boyd, Brian K.; Fowler, Kimberly M.; Koehler, Theresa M.; Sandusky, William F.; Sullivan, Greg P.; Pugh, Ray

    2015-04-05

    DOE FEMP guide for metering best practices aligned with the DOE Metering Guidance revision required by the 12/2013 Presidential Memo.

  20. Policy Flash 2014-22 Chart Supplement to Acquistion Guide | Department...

    Energy Savers [EERE]

    42 101 -- requirements by contract type 9.pdf More Documents & Publications Policy Flash 2013-68 Acquisition Guide 42.101 Chapter 42 - Contract Administration Department of Energy...

  1. URTAC Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 Meeting minutes and Federal Register notice for June 22, 2007 meeting previous 1 2 next Petroleum Reserves International Cooperation Natural Gas Regulation Advisory Committees...

  2. UDAC Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting minutes and Federal Register Notice for UDAC June 21, 2007 Meeting previous 1 2 next Petroleum Reserves International Cooperation Natural Gas Regulation Advisory Committees...

  3. NUG Meeting Nov. 15, 1999

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center Portland, OR Agenda ERSUG Meeting: Monday November 15, 1999 Doubletree Hotel - Lloyd Center, Portland The next NERSC User Group (ERSUG) meeting will be held in...

  4. March 23, 2016- SEAB Meeting

    Broader source: Energy.gov [DOE]

    The Secretary of Energy Advisory Board (SEAB) will meet in Washington, DC on March 23. The meeting details and agenda are forthcoming.

  5. Buildings to Grid Technical Meeting

    SciTech Connect (OSTI)

    none,

    2012-12-01

    A meeting book created for the Buildings to Grid Technical Meeting that includes speaker and attendee bios, as well as white papers and discussion questions.

  6. Commission Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission Meetings Meetings of the Commission to Review the Effectiveness of the National Energy Laboratories October 23, 2015 Commission to Review the Effectiveness of the ...

  7. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE August 9, 2012 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Committee Business ...................................................................................................................................... 4 Attachments

  8. 2012 ALS User Meeting Awards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ALS User Meeting Awards Recipients of the 2012 Users' Executive Committee awards and Student Poster Competition were announced Tuesday, October 9, at the ALS User Meeting. David...

  9. UDAC Meeting - April 2011 | Department of Energy

    Energy Savers [EERE]

    2011 UDAC Meeting (16th Meeting) PDF icon Federal Register notice More Documents & Publications UDAC Meeting - March 2012 UDAC Meeting - October 22, 2009

  10. URTAC Meeting - October 2011 | Department of Energy

    Energy Savers [EERE]

    1 URTAC Meeting - October 2011 PDF icon Meeting minutes PDF icon Federal Register notice More Documents & Publications URTAC Meeting - March 2012 URTAC Meeting - January

  11. Electricity Advisory Committee - 2016 Meetings | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - 2016 Meetings Electricity Advisory Committee - 2016 Meetings Electricity Advisory Committee - 2016 Meetings MARCH 17 & 18, 2016 MEETING OF THE ELECTRICITY ADVISORY COMMITTEE ...

  12. Electricity Advisory Committee (EAC) - Archived Meetings 2008...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAC) - Archived Meetings 2008 - 2015 Electricity Advisory Committee (EAC) - Archived Meetings 2008 - 2015 Past meetings of the Electricity Advisory Committee (EAC) 2015 Meetings: ...

  13. New Fuel Cell Projects Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Fuel Cell Projects Meeting New Fuel Cell Projects Meeting On February 13-14, 2007, the U.S. Department of Energy (DOE) held a kick-off meeting for fuel cell projects awarded under a hydrogen R&D solicitation. Principal investigators presented project overviews, which are provided below. Topics include: Membranes Water transport studies Catalyst development Innovative fuel cell concepts Cell hardware Reporting requirements Impurity studies Demonstrations The following documents are

  14. Smart Grid Investment Grant Selectee Kickoff Meeting | Department of Energy

    Energy Savers [EERE]

    Selectee Kickoff Meeting Smart Grid Investment Grant Selectee Kickoff Meeting Draft Agenda > (PDF 43 KB) THURSDAY, NOVEMBER 19, 2009 7:00-8:00am Registration and Continental Breakfast 8:00-8:15am Welcome - Opening Remarks Introduction - Rich Scheer (Transcription Go > PDF 14 KB) Opening Remarks - Matt Rogers (Transcription Go > PDF 28 KB) 8:15-8:30am Overarching Philosophy and Guiding Principles "SGIG Kickoff Welcome and Overview" - Eric Lightner (Presentation Go > PDF 429

  15. 2006 NMMSS Users Training Meeting | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration 6 NMMSS Users Training Meeting U.S. Department of Energy / U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards System 2006 NMMSS Users Training Meeting NMMSS is sponsored by the Office of Materials Integration within the U.S. Department of Energy and the U.S. Nuclear Regulatory Commission Attachment Size NMMSS Brochure 158.48 KB NMMSS Agenda 80.09 KB 30 Years of Service (Timothy Beckham) 60.26 KB ANSI Regulations Guide (Frank Fresella) 43.47 KB

  16. Benefits Forms & Required Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Benefits Forms & Required Notices Benefits Forms & Required Notices A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contacts Benefits Office (505) 667-1806 Email Benefits Forms & Required Notices Forms Benefits Enrollment Form, 1751a (pdf) Declaration of Domestic Partnership, 1925a (pdf) Declaration of Legal Ward as Eligible Dependent, 3028 (pdf) Declaration that Enrolled Dependent Meets IRS

  17. Synthetic guide star generation

    DOE Patents [OSTI]

    Payne, Stephen A.; Page, Ralph H.; Ebbers, Christopher A.; Beach, Raymond J.

    2004-03-09

    A system for assisting in observing a celestial object and providing synthetic guide star generation. A lasing system provides radiation at a frequency at or near 938 nm and radiation at a frequency at or near 1583 nm. The lasing system includes a fiber laser operating between 880 nm and 960 nm and a fiber laser operating between 1524 nm and 1650 nm. A frequency-conversion system mixes the radiation and generates light at a frequency at or near 589 nm. A system directs the light at a frequency at or near 589 nm toward the celestial object and provides synthetic guide star generation.

  18. Synthetic guide star generation

    DOE Patents [OSTI]

    Payne, Stephen A. [Castro Valley, CA; Page, Ralph H. [Castro Valley, CA; Ebbers, Christopher A. [Livermore, CA; Beach, Raymond J. [Livermore, CA

    2008-06-10

    A system for assisting in observing a celestial object and providing synthetic guide star generation. A lasing system provides radiation at a frequency at or near 938 nm and radiation at a frequency at or near 1583 nm. The lasing system includes a fiber laser operating between 880 nm and 960 nm and a fiber laser operating between 1524 nm and 1650 nm. A frequency-conversion system mixes the radiation and generates light at a frequency at or near 589 nm. A system directs the light at a frequency at or near 589 nm toward the celestial object and provides synthetic guide star generation.

  19. Seismic Safety Guide

    SciTech Connect (OSTI)

    Eagling, D.G.

    1983-09-01

    This guide provides managers with practical guidelines for administering a comprehensive earthquake safety program. The Guide is comprehensive with respect to earthquakes in that it covers the most important aspects of natural hazards, site planning, evaluation and rehabilitation of existing buildings, design of new facilities, operational safety, emergency planning, special considerations related to shielding blocks, non-structural elements, lifelines, fire protection and emergency facilities. Management of risk and liabilities is also covered. Nuclear facilities per se are not dealt with specifically. The principles covered also apply generally to nuclear facilities but the design and construction of such structures are subject to special regulations and legal controls.

  20. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  1. Comparison Evaluation of the PFP FSAR and NRC Regulatory Guide 3.39 with DOE-STD-3009-94

    SciTech Connect (OSTI)

    OSCARSON, E.E.

    2000-07-28

    One of the Plutonium Finishing Plant's (PFP) current Authorization Basis (AB) documents is the Final Safety Analysis Report (FSAR). This FSAR (HNF-SD-CP-SAR-02 1) was prepared to the format and content guidance specified in U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 3.39, Standard Format and Content of License Applications for Plutonium Processing and Fuel Fabrication Plants (RG 3.39). In April 1992, the US Department of Energy (DOE) issued DOE Order 5480.23 which established the FSAR requirements for DOE nonreactor nuclear facilities. In 1994, DOE issued DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports, which is a format and content guide addressing the preparation of FSARs in accordance with DOE Order 5480.23. During the initial preparation and issuance of the PFP FSAR the format and content guidance contained in NRC Regulatory Guide 3.39 was utilized, since it was the most applicable guidance at the time for the preparation of Safety Analysis Reports for plutonium processing plants. With the adoption of DOE Order 5480.23 and DOE-STD-3009-94, DOE required the preparation of SARs to meet the format and content of those DOE documents. The PFP was granted an exemption to continue with RG 3.39 format for future FSAR revisions. PFP modifications and additions have required PFP FSAR modifications that have typically been prepared to the same NRC Regulatory Guide 3.39 format and content, to provide consistency with the PFP FSAR. This document provides a table comparison between the 3009 and RG 3.39 formats to validate the extent of PFP FSAR compliance with the intent of DOE Order 5480.23 and DOE-STD-3009-94. This evaluation was initially performed on Revisions 1 and 1A of the PFP FSAR. With the preparation of a Revision 2 draft to the FSAR, sections with significant changes were reevaluated for compliance and the tables were updated, as appropriate. The tables resulting from this comparison provide a ''road map'' between the RG 3.39 format of the PFP FSAR and the requirements of 3009, to verify compliance with 3009 and identify any discrepancies. Because of the format differences between the RG 3.39 and 3009 guidance, the extent to which the PFP FSAR complies with 3009 is not entirely clear. No comparative evaluation of the existing PFP OSRs to the requirements contained in Chapter 5 of 3009 was performed.

  2. Past Meetings and Workshops

    Broader source: Energy.gov [DOE]

    Industry workshops help the U.S. Department of Energy (DOE) Solar Energy Technologies Office obtain a wide range of stakeholder feedback to guide the SunShot Initiative. DOE held the workshops below to identify barriers and opportunities associated with the SunShot goals.

  3. Focus Group Meeting (Topical Meeting) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Meeting Date: April 30, 2008 Documents Available for Download PDF icon Meeting Agenda PDF icon Meeting Summary PDF icon Meeting Participants PDF icon Executive Summary/Actions PDF icon Information Package - Part I PDF icon Information Package - Part II More Documents & Publications Focus Group Meeting (Topical Wrap-Up) Training Work Group Charter 2012 National Trainers' Exchange for Department of Energy Safety and Health Trainers

  4. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 43.2 (August 2013) Change Order Administration References * FAR Subpart 43.2, "Change Orders" * Policy Flash 2008-39, "Contract Change Order Administration of Department of Energy (DOE) Prime Contracts" * Acquisition Guide 15.4-1, "Pricing Contract Modifications" Overview This chapter provides guidance to ensure the proper issuance and administration of change orders. A change order template and sample clauses are provided in order to facilitate consistent

  5. Program Planning Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Guide Program Planning Guide SEP program planning guide.pdf More Documents & Publications SEP Presentations Materials SEP Toolkit Overview The Cummins Rocky Mount...

  6. Guiding SSL Technology Advances | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guiding SSL Technology Advances Guiding SSL Technology Advances PDF icon Guiding Solid-State Lighting Technology Advances More Documents & Publications Doing Business with DOE's ...

  7. Caltrans Encroachment Permit Application Guide | Open Energy...

    Open Energy Info (EERE)

    Application GuidePermittingRegulatory GuidanceGuideHandbook Abstract This guide sets forth the application procedure for encroachment permits under Caltrans. Author Caltrans...

  8. Guide to Scientific Management | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Guide to Scientific Management A Practical Guide to Scientifıc Management for Postdocs and New Faculty. PDF icon Guide to Scientific Management second edition.pdf

  9. Requirements for GNEP Transmutation Fuels

    SciTech Connect (OSTI)

    D. C. Crawford; M. K. Meyer; S. L. Hayes

    2007-03-01

    The purpose of this document is to provide a baseline set of requirements to guide fuel fabrication development and irradiation testing performed as part of the AFCRD Transmutation Fuel Development Program. This document can be considered a supplement to the GNEP TRU Fuel Development and Qualification Plan, and will be revised as necessary to maintain a documented set of fuel testing objectives and requirements consistent with programmatic decisions and advances in technical knowledge.

  10. ICEIWG Meeting Agendas and Summaries

    Broader source: Energy.gov [DOE]

    Download meeting agendas and summaries from the Indian Country Energy and Infrastructure Working Group (ICEIWG).

  11. NNMCAB Combined Committee Meeting

    Office of Environmental Management (EM)

    February 10, 2016 2:00 p.m. to 4:00 p.m. NNMCAB Office 94 Cities of Gold Road Santa Fe, NM 87506 AGENDA 2:00 p.m. Call to Order 2:02 p.m. Welcome and Introductions 2:08 p.m. Approval of Agenda 2:10 p.m. Approval of Minutes from January 13, 2016 2:15 p.m. New Business  Discussion on Committee Meeting Schedule for CY'16 (should committee meetings be held on bi-monthly meeting months)  Discussion on Draft Recommendation 2016-02 "Budget Priorities"  Other Items 3:00 p.m. Update

  12. Mail Services User's Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-03

    This Guide provides information on using Department of Energy (DOE) mail services in accordance with U.S. Postal Service, General Services Administration (GSA), and DOE regulations. Cancels DOE M 573.1-1. Canceled by DOE N 251.89.

  13. Consumer Guide for Solar

    Broader source: Energy.gov [DOE]

    MARC’s Consumer Guide to Solar provides answers to frequently asked questions, as well as guidance on how to get started with solar energy. The objective in creating this resource was to provide clear information to consumers in the Kansas City region who are interested in installing solar on their home or business.

  14. Sensor Characteristics Reference Guide

    SciTech Connect (OSTI)

    Cree, Johnathan V.; Dansu, A.; Fuhr, P.; Lanzisera, Steven M.; McIntyre, T.; Muehleisen, Ralph T.; Starke, M.; Banerjee, Pranab; Kuruganti, T.; Castello, C.

    2013-04-01

    The Buildings Technologies Office (BTO), within the U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), is initiating a new program in Sensor and Controls. The vision of this program is: • Buildings operating automatically and continuously at peak energy efficiency over their lifetimes and interoperating effectively with the electric power grid. • Buildings that are self-configuring, self-commissioning, self-learning, self-diagnosing, self-healing, and self-transacting to enable continuous peak performance. • Lower overall building operating costs and higher asset valuation. The overarching goal is to capture 30% energy savings by enhanced management of energy consuming assets and systems through development of cost-effective sensors and controls. One step in achieving this vision is the publication of this Sensor Characteristics Reference Guide. The purpose of the guide is to inform building owners and operators of the current status, capabilities, and limitations of sensor technologies. It is hoped that this guide will aid in the design and procurement process and result in successful implementation of building sensor and control systems. DOE will also use this guide to identify research priorities, develop future specifications for potential market adoption, and provide market clarity through unbiased information

  15. Mission Need Statement Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-20

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06, by providing suggested content, definitions, and examples for writing a clear statement to support an acquisition executive's decision to initiate exploration of options to fulfill a capability gap, which may include a capital asset acquisition. No cancellation.

  16. Hydrodynamic blade guide

    DOE Patents [OSTI]

    Blaedel, Kenneth L.; Davis, Pete J.; Landram, Charles S.

    2000-01-01

    A saw having a self-pumped hydrodynamic blade guide or bearing for retaining the saw blade in a centered position in the saw kerf (width of cut made by the saw). The hydrodynamic blade guide or bearing utilizes pockets or grooves incorporated into the sides of the blade. The saw kerf in the workpiece provides the guide or bearing stator surface. Both sides of the blade entrain cutting fluid as the blade enters the kerf in the workpiece, and the trapped fluid provides pressure between the blade and the workpiece as an inverse function of the gap between the blade surface and the workpiece surface. If the blade wanders from the center of the kerf, then one gap will increase and one gap will decrease and the consequent pressure difference between the two sides of the blade will cause the blade to re-center itself in the kerf. Saws using the hydrodynamic blade guide or bearing have particular application in slicing slabs from boules of single crystal materials, for example, as well as for cutting other difficult to saw materials such as ceramics, glass, and brittle composite materials.

  17. Information Technology Project Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12

    This Guide provides Department of Energy recommended guidelines to ensure that the acquisition of information technology capital assets is performed in compliance with DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE N 251.105.

  18. 2005 buyer's guide

    SciTech Connect (OSTI)

    2005-11-01

    The guide gives contact details of about 90 companies in the USA specialising in a full range of equipment for use in the coal industry. The companies are listed by category. Equipment for coal preparation, materials handling, haulage, and transport, coal mining and fire and environmental protection is included.

  19. Spring 2006 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you may find unedited transcripts of EIA's spring 2006 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings may be found to the right of the Thursday and Friday transcripts. The public meeting took place April 6 and 7,

  20. Spring 2006 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's spring 2007 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place April 19 and

  1. Spring 2008 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's fall 2008 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place October 23 and

  2. Spring 2008 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's spring 2008 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place on April 9,

  3. Spring 2009 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    9 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's spring 2009 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place on April 2

  4. Fall 2007 ASA Meeting Disclaimer

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's fall 2007 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place October 18 and

  5. City of Lancaster- Mandatory Solar Requirement for New Homes

    Broader source: Energy.gov [DOE]

    PV is not required on all homes within a production subdivision, but the builder must meet the aggregate requirement within the subdivision. For example, one house with twice the required PV can ...

  6. 2009 Coal Age Buyers Guide

    SciTech Connect (OSTI)

    2009-07-15

    The buyers guide lists more than 1200 companies mainly based in the USA, that provide equipment and services to US coal mines and coal preparation plants. The guide is subdivided by product categories.

  7. H2 Educate! Teacher Guide

    Fuel Cell Technologies Publication and Product Library (EERE)

    H2 Educate! Teacher and Student Guides - These new guides were developed by the National Energy Education Development (NEED) Project's Teacher Advisory Board for the DOE Hydrogen Program. Sentech, Inc

  8. H2 Educate! Student Guide

    Fuel Cell Technologies Publication and Product Library (EERE)

    H2 Educate! Teacher and Student Guides - These new guides were developed by the National Energy Education Development (NEED) Project's Teacher Advisory Board for the DOE Hydrogen Program. Sentech, Inc

  9. 2008 Coal Age buyers guide

    SciTech Connect (OSTI)

    2008-07-15

    The buyers guide lists more than 1200 companies mainly based in the USA, that provide equipment and services to US coal mines and coal preparation plants. The guide is subdivided by product categories.

  10. Portland's Residential Solar Permitting Guide

    Broader source: Energy.gov [DOE]

    This program guide outlines the application and review procedures for obtaining the necessary permit(s) to install a solar energy system for a new or existing residential building. The guide also...

  11. Meeting and Presentation Materials

    Office of Environmental Management (EM)

    n v i r o n m e n t a l M a n a g e m e n t Quality Assurance Corporate Board Meeting June 9, 2010 Chicago, Illinois 7 th EM Quality Assurance Corporate Board Meeting June 9, 2010 Chicago, Illinois Table of Contents 1. Agenda 2. By-Laws (Distributed for Board Vote via Email) 3. Focus Area Distribution (Distributed for Board Vote via Email) 4. Draft Project Plan for Current Focus Areas 5. Overview of Current Corporate Quality Assurance Issues, Challenges, and Priorities 6. Industry Perspective 7.

  12. Meeting and Presentation Materials

    Office of Environmental Management (EM)

    MEETING Meeting Location: 9950 Covington Cross Drive, Las Vegas, Nevada 89144 Building/Room: BSC Office Building/Conference Rm. 915 March 13, 2008: 8:00 am - 5:00 pm AGENDA March 13, 2008 8:00- 8:30 COFFEE ALL 8:30 - 8:45 Welcome and Opening Remarks Dae Chung Leo Sain (WSRC) I 8:45 - 9:00 Introduction of Board Members ALL 9:00 - 10:00 EM QA Initiatives Sandra Waisley * New Office of Standards and Quality Bob Murray Assurance (EM-64) * EM QA Initiatives - Overview - EM Centralized Training

  13. 2016 CAMD User Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CAMD 2016 User Meeting Friday, April 29th, 2016 CAMD, 6980 Jefferson Highway, Baton Rouge, LA 70806 The CAMD 2016 User Meeting will be held on Friday, April 29th at CAMD, 6980 Jefferson Highway, Baton Rouge, LA 70806. There will be a "Celebration of MPW" in the morning, coinciding with a poster session in the Experimental Hall starting at 10:30 AM. Beamline scientists will be on hand to explain the new features of the multi-pole wiggler beamlines. Lunch will be provided before the

  14. A guide to CERCLA site assessment. Environmental Guidance

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Pocket Guide is a condensed version of information provided in three EPA documents: Guidance for Performing Preliminary Assessments Under CERCLA, Guidance for Performing Site Inspections Under CERCLA, and Hazard Ranking System Guidance Manual. Additionally the guide provides a DOE perspective on site assessment issues and information on the Federal Agency Hazardous Waste Compliance Docket as well as data sources for DOE site assessments. The guide is intended to present this information in a simple, portable, and direct manner that will allow the user to effectively focus on those aspects of the site assessment process of interest. The guide is not intended as a substitute for the three EPA guidance documents mentioned previously. DOE investigators should be thoroughly familiar with the EPA guidance before conducting site assessments. Use this pocketguide as an overview of procedures and requirements and as a field guide.

  15. ARM - 1992 ARM Science Team Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ARM Science Team Meeting 1992 Meeting 1992 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 1992 ARM Science Team Meeting October 26 - 30 | Denver, Colorado | Denver Skyline The second ARM Science Team Meeting was held in Denver, Colorado

  16. ARM - 1994 ARM Science Team Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 ARM Science Team Meeting 1994 Meeting 1994 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 1994 ARM Science Team Meeting February 28 - March 3 | Charleston, South Carolina The fourth ARM Science Team Meeting was held in Charleston, South Carolina. The Science

  17. ORSSAB Meeting - June 2015 | Department of Energy

    Office of Environmental Management (EM)

    5 ORSSAB Meeting - June 2015 Oak Ridge Site Specific Advisory Board meeting minutes and materials. PDF icon Agenda PDF icon Meeting Materials - June 2015 PDF icon Oak Ridge Reservation Groundwater Strategy Status PDF icon Meeting Minutes - June 2015 More Documents & Publications ORSSAB Meeting - Annual Meeting August 2014 ORSSAB Meeting - September 2013 ORSSAB Meeting - September

  18. Permitting Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety, Codes & Standards » Current Approaches to Safety, Codes & Standards » Regulations, Guidelines, & Codes & Standards » Permitting Guides Permitting Guides Standardized procedures for permitting hydrogen technologies and systems are not yet well established. As a first step, DOE sponsored the development of a new guide designed to help regulators sort through the multitude of codes and standards that apply when permitting hydrogen facilities. The Regulators' Guide to

  19. Residential Retrofit Design Guide Overview

    Broader source: Energy.gov [DOE]

    This webinar covered the Residential Retrofit Program Design Guide and its elements, including assess, plan, implement, and evaluate.

  20. Business Model Guide Executive Summary

    Broader source: Energy.gov [DOE]

    The Business Model Guide Executive Summary by the U.S. Department of Energy's Better Buildings Neighborhood Program.

  1. DOE Handbook: Guide to good practices evaluation instrument examples

    SciTech Connect (OSTI)

    1997-01-01

    Training evaluation determines a training program`s effectiveness in meeting its intended purpose: producing competent employees. Evaluation is the quality assurance component of a systematic approach to training program. This guide provides information on evaluation instruments used to gather employee, supervisor, and instructor feedback to identify strengths and weaknesses of training programs at DOE facilities. It should be used in conjunction with ``DOE Training Program Handbook: A Systematic Approach to Training`` and ``DOE Handbook, Alternative Systematic Approaches to Training.``

  2. Electricity Advisory Committee Notice of Open Meeting March 12...

    Broader source: Energy.gov (indexed) [DOE]

    This notice announces a meeting of the Electricity Advisory Committee (EAC) on March 12 and 13, 2014. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires...

  3. UDAC Meeting - December 2008 | Department of Energy

    Energy Savers [EERE]

    December 2008 UDAC Meeting - December 2008 PDF icon Federal Register notice PDF icon Meeting Minutes More Documents & Publications UDAC Meeting - March 2012 UDAC Meeting - October 22, 2009 UDAC Meeting - October 23, 2008

  4. UDAC Meeting - March 2012 | Department of Energy

    Energy Savers [EERE]

    2012 UDAC Meeting PDF icon UDAC - Minutes for March 8, 2012 Meeting More Documents & Publications UDAC Meeting - October 22, 2009 UDAC Meeting - April 2011 UDAC Meeting - October 23, 2008

  5. UDAC Meeting - March 2012 | Department of Energy

    Energy Savers [EERE]

    1, 2012 UDAC Meeting PDF icon Federal Register Notice for March 1, 2012 UDAC Meeting More Documents & Publications Federal Register Notice for February 2012 Meeting UDAC Meeting - September 2012 UDAC Meeting - March 2012

  6. URTAC Meeting - September 2012 | Department of Energy

    Energy Savers [EERE]

    Federal Register Notice for September 25, 2012 URTAC Meeting PDF icon URTAC - Federal Register Notice for September 25, 2012 Meeting More Documents & Publications UDAC Meeting - September 2012 URTAC Meeting - October 2012 URTAC Meeting - September

  7. STEAB April Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TX 78701 Rio Grande Conference Room DAY 1 - April 28 th 8:00 - 8:45 Breakfast, hotel meeting room 8:45 - 9:00 Agenda and Tour Overview Monica and Frank 9:00 - 9:45 Overview ...

  8. 2013 NUFO Annual Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 NUFO Annual Meeting http://www.nufo.org/events.aspx?id=64 June 19 - 21, 2013; Lawrence Berkeley National Laboratory, hosted jointly by the six user facilities at LBNL: the Advanced Light Source, The Molecular Foundry, the Joint Genome Institute, the National Center for Electron Microscopy, ESNet and NERSC.

  9. Department of Energy Employee Concerns Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-02-01

    The Department of Energy (DOE) recognizes that free and open expression of DOE Federal and contractor and subcontractor employee concerns is essential to safe and efficient accomplishment of DOE's missions. DOE employees and any contractor or subcontractor fulfilling DOE's mission have the right and responsbility to report concerns relating to the environment, safety, health, or management of Department operations. The guide provides methods of implementing requirements of DOE O 442.1. Does not cancel/supersede other directives.

  10. 50% Advanced Energy Design Guides: Preprint

    SciTech Connect (OSTI)

    Bonnema, E.; Leach, M.; Pless, S.; Liu, B.; Wang, W.; Thornton, B.; Williams, J.

    2012-07-01

    This paper presents the process, methodology, and assumptions for the development of the 50% Energy Savings Advanced Energy Design Guides (AEDGs), a design guidance document that provides specific recommendations for achieving 50% energy savings above the requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 in four building types: (1) Small to medium office buildings, (2) K-12 school buildings, (3) Medium to big box retail buildings, (4) Large hospital buildings.

  11. Meeting and Presentation Materials

    Office of Environmental Management (EM)

    1) Agenda 2) Presentations: a. Welcome, Agenda and any High Priority Issues b. Issuance of DOE O 414.1D - How it Affects EM Sites c. EM Commercial Grade Dedication Guide d. Integration of QA in Design Guidance Document e. Draft Revision to the Standard QA Contract Language f. Operational Awareness - Basic QA Profile Associated with EM Hazard Category 2 and 3 Nuclear Operations g. EFCOG Current Efforts & Relationship to the EM QA Corporate Board Priorities & Focus Areas 3) Commercial

  12. URTAC Meeting - November 2012 | Department of Energy

    Energy Savers [EERE]

    March 2012 URTAC Meeting - March 2012 Minutes from March 2012 URTAC Meeting PDF icon URTAC - Minutes for March 8, 2012 Meeting More Documents & Publications URTAC Meeting - October 22, 2009 URTAC Meeting - October 2011 UDAC Meeting - March

    November 2012 URTAC Meeting - November 2012 Federal Register Notice for November 1, 2012 URTAC Meeting PDF icon URTAC - Federal Register Notice for November 1, 2012 Meeting More Documents & Publications UDAC Meeting - November 2012 Federal Register

  13. ARM - 2005 Science Team Meeting Pictures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meeting2005 Science Team Meeting Pictures 2005 Meeting 2005 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Cover Competition Winners Pictures Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 2005 Science Team Meeting Pictures Daytona Beach teased ARM scientists through hotel windows during the week-long meeting. Daytona Beach teased ARM scientists through hotel windows during the week-long meeting. Seagulls play on the beach. Seagulls play

  14. Fuel Reformer, LNT and SCR Aftertreatment System Meeting Emissions Useful

    Broader source: Energy.gov (indexed) [DOE]

    Life Requirements | Department of Energy EAS performance results following 500 DeSOx CyclesMeets Off-Road Final Tier 4 and HD On-road Emission Standards PDF icon deer09_mccarthy.pdf More Documents & Publications Improved System Performance and Reduced Cost of a Fuel Reformer, LNT, and SCR Aftertreatment System Meeting Emissions Useful Life Requirement LNT + SCR Aftertreatment for Medium-Heavy Duty Applications: A Systems Approach Eaton Aftertreatment System (EAS) for On-Highway Diesel

  15. Guiding Principles for Successfully Implementing Industrial Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INDUSTRIAL TECHNOLOGIES PROGRAM Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations April 2011 (DRAFT) Acknowledgement Guiding Principles ...

  16. Guiding Principles for Successfully Implementing Industrial Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations Guiding Principles for Successfully Implementing Industrial Energy Assessment ...

  17. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  19. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  20. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.