Powered by Deep Web Technologies
Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

TRANSIENT FATIGUE-CRACK GROWTH BEHAVIOR FOLLOWING VARIABLE-AMPLITUDE LOADING IN A  

E-Print Network (OSTI)

TRANSIENT FATIGUE-CRACK GROWTH BEHAVIOR FOLLOWING VARIABLE-AMPLITUDE LOADING IN A MONOLITHIC-crack growth behavior following variable-amplitude loading sequences has been investigated in a hot-toughened ceramics [13] following various variable-amplitude loading sequences. Transient retardations, involving

Ritchie, Robert

2

Analysis of Fatigue Crack Growth under Random Load Sequences Derived from Military In-flight Load Data  

Science Journals Connector (OSTI)

The crack growth process of a crack initiating at a hole of a skin-stringer panel in a fighter aircraft subjected to random variable amplitude loading is investigated in this paper. The generation of synthetic...

C. Mattrand; J. -M. Bourinet; D. Théret

2011-01-01T23:59:59.000Z

3

Enhancement of loading capacity of distribution system through distributed generator placement considering techno-economic benefits with load growth  

Science Journals Connector (OSTI)

Abstract Load growth in a system is a natural phenomenon. With the increase in load demand, system power loss and voltage drop increases. Distributed generators (DGs) are one of the best solutions to cope up with the load growth if they are allocated appropriately in the distribution system. In this work, optimal size and location of multiple \\{DGs\\} are found to cater the incremental load on the system and minimization of power loss without violating system constraints. For this a predetermined annual load growth up to five years is considered with voltage regulation as a constraint. The particle swarm optimization with constriction factor approach is applied to determine the optimum size and location with multiple DGs. To see the effect of load growth on system, 33-node IEEE standard test case is considered. It is observed that with the penetration of multiple number of \\{DGs\\} in distribution system, there is great improvement in several distribution system parameters. Moreover, the loading capacity of distribution system is enhanced through DG placement and its techno-economic benefits are also established.

Khyati D. Mistry; Ranjit Roy

2014-01-01T23:59:59.000Z

4

Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Outage Coordination Presentation NOA - General References Guide Draft NOC Charter Demand Response NOC Meeting Notes - 6122014 April 23, 2014 NT Redispatch Meeting NT Redispatch...

5

Meeting National Needs, Creating Opportunities for Growth Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

National Needs, Creating Opportunities for Growth National Needs, Creating Opportunities for Growth Brookhaven National Laboratory Economic Impact Report This report was prepared by Appleseed, a New York City-based economic development consulting firm that works with government, corporations, and nonprofit institutions to promote economic growth and opportunity. 80 Broad Street 13th Floor New York, NY 10004 www.appleseedinc.com Fiscal Year 2009 Highlights By the numbers... State & Local Impacts National Influence Global Reach $704 Million in economic output generated by Brookhaven Lab and its visitors $573 Million in total funding 5,400 jobs created throughout New York State 3,000 employees, 98% living on Long Island 12% growth in employment from 2006 to 2009 $74.7 Million invested in new facilities and renovations

6

Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Meetings Customer Comments Network Integration Transmission Service (NT...

7

Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Forum Energy Imbalance Market Meetings Customer Comments Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

8

Meetings  

Science Journals Connector (OSTI)

...Sanitation Branch, Office of Public Health, Intern. Coopera-tion...Textile Inst., intern. meeting, Eastbourne, England...of America, field meeting, Newark, Del. (G...En-gineers, summer meeting, Denver, Colo. (R...Committee for ICCE, 2000 K St., NW, Washington...

1962-05-18T23:59:59.000Z

9

Relevance of valve overlap for meeting Euro 5 soot emissions requirements during load transient process in heavy duty diesel engines  

Science Journals Connector (OSTI)

This work describes the influence on performance and soot emissions of using different valve overlap camshafts during load transient processes in a heavy duty (HD) diesel engine equipped with a variable geometry turbine (VGT) in its turbocharger and a selective catalyst reactor (SCR) in the exhaust line. Based on the results of experiments and calculations, in this paper a description is given of how the valve timing affects the instantaneous exhaust and intake pressure, the short-circuit of the air mass flow, the prejudicial backflows, the performance of the turbine and hence the general performance and pollutant emissions of a VGT equipped HD diesel engine during a transient process. The paper concludes that very low or no overlap is imperative if a VGT is used to meet forthcoming pollutant emissions restrictions and to improve the transient response of HD turbocharged diesel engines.

J. Galindo; J.R. Serrano; F. Vera; C. Cervello; M. Lejeune

2006-01-01T23:59:59.000Z

10

Meetings  

Science Journals Connector (OSTI)

...samples caused by power failures. It...special LINDE insulation holds evaporation...Special LINDE Insulation Predict Stoage...decomposition products of plant res-idues as...chemical aspects of plant growth regulation...be announced; specifications: 14" x 8Y85...Blackman, "Thermal expan-sion...

1959-03-06T23:59:59.000Z

11

Fatigue of polycrystalline silicon for MEMS applications: Crack growth and stability under resonant loading conditions  

E-Print Network (OSTI)

S.B. , 1999. Subcritical crack growth in silicon MEMS. J.appearance of subcritical crack growth in the absence ofbe mistaken for subcritical fatigue-crack growth when the

Muhlstein, C.L.; Howe, R.T.; Ritchie, R.O.

2001-01-01T23:59:59.000Z

12

Information technology and innovative drainage management practices for selenium load reduction from irrigated agriculture to provide stakeholder assurances and meet contaminant mass loading policy objectives  

SciTech Connect

Many perceive the implementation of environmental regulatory policy, especially concerning non-point source pollution from irrigated agriculture, as being less efficient in the United States than in many other countries. This is partly a result of the stakeholder involvement process but is also a reflection of the inability to make effective use of Environmental Decision Support Systems (EDSS) to facilitate technical information exchange with stakeholders and to provide a forum for innovative ideas for controlling non-point source pollutant loading. This paper describes one of the success stories where a standardized Environmental Protection Agency (EPA) methodology was modified to better suit regulation of a trace element in agricultural subsurface drainage and information technology was developed to help guide stakeholders, provide assurances to the public and encourage innovation while improving compliance with State water quality objectives. The geographic focus of the paper is the western San Joaquin Valley where, in 1985, evapoconcentration of selenium in agricultural subsurface drainage water, diverted into large ponds within a federal wildlife refuge, caused teratogenecity in waterfowl embryos and in other sensitive wildlife species. The fallout from this environmental disaster was a concerted attempt by State and Federal water agencies to regulate non-point source loads of the trace element selenium. The complexity of selenium hydrogeochemistry, the difficulty and expense of selenium concentration monitoring and political discord between agricultural and environmental interests created challenges to the regulation process. Innovative policy and institutional constructs, supported by environmental monitoring and the web-based data management and dissemination systems, provided essential decision support, created opportunities for adaptive management and ultimately contributed to project success. The paper provides a retrospective on the contentious planning process and offers suggestions as to how the technical and institutional issues could have been resolved faster through early adoption of some of the core principles of sound EDSS design.

Quinn, N.W.T.

2009-10-15T23:59:59.000Z

13

Validation of the state-space model of fatigue crack growth in ductile alloys under variable-amplitude load via comparison of the crack-opening stress data  

Science Journals Connector (OSTI)

A state-space model of fatigue crack growth in ductile alloys under variable-amplitude load was presented by Patankar and Ray (Patankar...International Journal of Fracture, 90, 235--249; Patankar and Ray (2000).

Ravindra Patankar; Rong Qu

2005-02-01T23:59:59.000Z

14

1993 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

United States. Bonneville Power Administration.

1993-12-01T23:59:59.000Z

15

Focus Group Meeting (Topical Meeting)  

Energy.gov (U.S. Department of Energy (DOE))

Topical Meeting - Training Meeting agenda, summary and information package Meeting Date: April 30, 2008

16

1991 Pacific Northwest Loads and Resources Study.  

SciTech Connect

This study establishes the Bonneville Power Administration's (BPA) planning basis for supplying electricity to BPA customers. The Loads and Resources Study is presented in three documents: (1) this summary of federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates our 1990 study. BPS's long-range planning incorporates resource availability with a range of forecasted electrical consumption. The forecasted future electrical demands-firm loads--are subtracted from the projected capability of existing resources to determine whether BPA and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, then additional conservation, contract purchases, or generating resources will be needed to meet load growth. This study analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional profile, which includes loads and resources in addition to the federal system. This study presents the federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for 1992- 2012.

United States. Bonneville Power Administration.

1991-12-01T23:59:59.000Z

17

Focus Group Meeting (Topical Meeting)  

Energy.gov (U.S. Department of Energy (DOE))

Safety Standards/10 CFR 851 Meeting agenda, summary and information package Meeting Date: July 17, 2008

18

Focus Group Meeting (Topical Meeting)  

Energy.gov (U.S. Department of Energy (DOE))

Aging Workforce and Strategic Initiatives Meeting agenda, summary and information package Meeting Date: November 6, 2008

19

meeting | OpenEI Community  

Open Energy Info (EERE)

93 93 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234893 Varnish cache server meeting Home Kyoung's picture Submitted by Kyoung(155) Contributor 6 September, 2012 - 08:51 GRR Update Meeting scheduled for 9/13 in D.C. D.C. GRR meeting update The next Geothermal Regulatory Roadmap update meeting will be held in Washington, D.C. on Thursday, September 13 from 2-4 p.m. Syndicate content 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

20

Focus Group Meeting (Topical Meeting)  

Energy.gov (U.S. Department of Energy (DOE))

Former Worker/Energy Compensation Programs and CAIRS Reporting Meeting agenda, summary and information package Meeting Date: September 16, 2008

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EMAB Meetings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independence Ave., SW Washington, DC 20585 202-586-7709 en EMAB Meeting - May 2014 http:energy.govemdownloadsemab-meeting-may-2014 meeting-may-2014...

22

EMAB Meetings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

emab-meetings Office of Environmental Management 1000 emab-meetings Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 202-586-7709 en EMAB Meeting - June 2013 http://energy.gov/em/downloads/emab-meeting-june-2013 meeting-june-2013" class="title-link">EMAB Meeting - June 2013

23

Meeting Agenda  

Energy.gov (U.S. Department of Energy (DOE))

Meeting agenda for the Flow Cells for Energy Storage Workshop held March 7-8, 2012, in Washington, DC.

24

Truck loading rack blending  

SciTech Connect

Blending, the combining of two or more components to make a single product, has become widely used in most loading rack applications. Blending should not be confused with additive injection, which is the injection of very small doses of enhancers, detergents and dyes into a product stream. Changes in the environmental protection laws in the early 90`s have put increasing demands on marketing terminals with regards to reformulated fuels and environmental protection concerns. As a result of these new mandates, terminals have turned to blending at the loading rack as an economical and convenient means in meeting these new requirements. This paper will discuss some of these mandates and how loading rack blending is used for different applications. Various types of blending will also be discussed along with considerations for each method.

Boubenider, E. [Daniel Flow Products, Inc., Houston, TX (United States)

1995-12-01T23:59:59.000Z

25

MEETING OVERVIEW  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jacksonville 1999 Meeting Jacksonville 1999 Meeting Jacksonville 1999 Meeting MEETING OVERVIEW The Transportation External Coordination Working Group (TEC/WG) held its 14th semi-annual meeting January 20-22, 1999 in Jacksonville, Florida. Over 160 members, participants, and observers representing state, tribal, and local governments, regional groups, industry and professional organizations, and the Department of Energy (DOE) met to address a variety of issues related to DOE's transportation activities for radioactive materials. A number of Departmental programs with transportation components were represented, including: the Office of Environmental Management (EM); the Office of Civilian Radioactive Waste Management

26

Plug Load  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Commercial Commercial Industrial Lighting Energy Smart Grocer Program HVAC Program Shell Measures Commercial Kitchen & Food Service Equipment Plug Load New...

27

Laughlin Meeting Transcripts | A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laughlin Meeting Transcripts | A Laughlin Meeting Transcripts | A 75BLaughlin Meeting Transcripts Laughlin Meeting Transcripts | 1 Laughlin Meeting Transcripts | 2 Laughlin Meeting Transcripts | 3 Comments noted. Laughlin Meeting Transcripts | 4 Comment noted. Impacts to wildlife are discussed throughout Section 4.4-Biological Resources Impacts. Laughlin Meeting Transcripts | 5 Laughlin Meeting Transcripts | 6 Laughlin Meeting Transcripts | 7 Laughlin Meeting Transcripts | 8 Laughlin Meeting Transcripts | 9 Laughlin Meeting Transcripts | 10 Laughlin Meeting Transcripts | 11 Laughlin Meeting Transcripts | 12 Laughlin Meeting Transcripts | 13 Laughlin Meeting Transcripts | 14 Laughlin Meeting Transcripts | 15 Laughlin Meeting Transcripts | 16 The potential impacts identified in the comment are described in the EIS

28

2010 PDSF Meeting Minutes  

NLE Websites -- All DOE Office Websites (Extended Search)

2010 PDSF Users Meeting Minutes December 21 PDSF Users Meeting 12/21/10 Attending: Eric and Jay from NERSC and users Andrei and Jeff P. Cluster status and utilization: Cluster has been loaded to capacity recently. STAR is running a lot of jobs, many of the grid-based and submitted from BNL. ALICE, ATLAS and icecube also running. Outages and Downtimes: There was an NGF downtime on the 16th, otherwise things have been stable for the most part. Procurements and New Hardware: Will get more storage for kamland. It will be an... December 7 PDSF Users Meeting 12/7/10 Attending: Eric, Katie and Jay from NERSC and users Andrei, Yushu, Thomas, Jeff P., Craig, Joanna Cluster status: Cluster has been full most of the time and is full today. STAR and ALICE running a steady stream of grid jobs. Outages: Yesterday there

29

MEETING OVERVIEW  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Las Vegas Meeting - January 1998 Las Vegas Meeting - January 1998 MEETING OVERVIEW The Transportation External Coordination Working Group (TEC/WG) held its 13th semi-annual meeting January 20-22, 1998 in Las Vegas, Nevada. Over 150 members, participants, and observers representing state, tribal, and local governments, regional groups, industry and professional organizations, and the Department of Energy met to address a variety of issues related to DOE's transportation activities for radioactive materials. A number of Departmental programs with transportation components were represented, including: the Office of Environmental Management (EM); the Office of Civilian Radioactive Waste Management; the Office of Naval Reactors (NR); the Waste

30

Load Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Visualization and Controls Peer Review Visualization and Controls Peer Review Load Control for System Reliability and Measurement-Based Stability Assessment Dan Trudnowski, PhD, PE Montana Tech Butte, MT 59701 dtrudnowski@mtech.edu 406-496-4681 October 2006 2 Presentation Outline * Introduction - Goals, Enabling technologies, Overview * Load Control - Activities, Status * Stability Assessment - Activities, Status * Wrap up - Related activities, Staff 3 Goals * Research and develop technologies to improve T&D reliability * Technologies - Real-time load control methodologies - Measurement-based stability-assessment 4 Enabling Technologies * Load control enabled by GridWise technology (e.g. PNNL's GridFriendly appliance) * Real-time stability assessment enabled by Phasor Measurement (PMU) technology 5 Project Overview * Time line: April 18, 2006 thru April 17, 2008

31

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corporate Board Meeting Corporate Board Meeting Denver, CO July 29 - 30, 2008 8:00am - 5:00pm Meeting Notes The meeting was held at the Hyatt Regency Tech Center, Wind River Meeting Room (See Attachment 1, Agenda). Welcome/ Opening Remarks Dae Chung, Joe Bader, and Leo Sain provided opening remarks Intro of Board Members and Other Participants Sandra Waisley provided logistics information. Materials included in the folder and logistics for lunch. Intro of Board Members and members introduced staff in attendance. EM QA Initiatives Update Sandra Waisley- Developing the first EM performance metrics system Ensure implementation of DOE Order 414.1C 15 Audits to finish up in FY08 Mr. Bader- NRC '03 report on NQA-1 Sain: why waist time trying to update NQA-1

32

MEETING OVERVIEW  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Charleston Meeting - January 1997 Charleston Meeting - January 1997 MEETING OVERVIEW The Transportation External Coordination Working Group (TEC/WG) held its eleventh semi-annual meeting January 14-16, 1997 in Charleston, South Carolina. Over one hundred participants, representing state, tribal and local governments, regional groups, industry, professional organizations, and the U.S. Department of Energy, met to address a variety of issues related to DOE's transportation activities for radioactive materials. The following summarizes the major discussions and action items from the meeting. TOPIC GROUP SUMMARIES Topic Groups have been formed with TEC/WG participants having particular interest or expertise in each of four areas: Route Identification, Funding and Technical Assistance for Emergency Preparedness, Railroad Operational

33

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 EM Quality Assurance Corporate Board Meeting November 13 - 14, 2008 Atlanta, Georgia Meeting Minutes November 13, 2008 Dae Chung (EM Headquarters) provided opening remarks. This is the third EM QA Corporate Board meeting this year. Dae introduced Robert Brown (DOE Deputy Site Manager - Oak Ridge) and asked him to make additional remarks. Mr. Brown discussed Oak Ridge's integration of ISO 9001 within NQA-1 and setting up an interdisciplinary team with ISO folks from Chicago participating on the team. Andrea (Cissy) Perkins (EM Oak Ridge QA Manager) commented on the value of working with the contractor to integrate QA across the site.

34

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Quality Assurance Corporate Board Meeting Minutes Environmental Management Quality Assurance Corporate Board Meeting Minutes July 21, 2011 - Video Conference Page 1 of 5 Voting Board Members in Attendance: Brian Anderson - Idaho Randy Smyth - Oak Ridge Ray Corey - Richland Robert Edwards - Savannah River Bud Danielson -Chief of Nuclear Safety Jack Craig - EMCBC Jim Hutton (chair) - Headquarters Acting EM-20 Russell McCallister - Portsmouth/Paducah Bob Murray (vice-chair) - Headquarters EM-23 No Voting Member Present - Carlsbad Paul Harrington - River Protection Introduction Jim Hutton introduced himself as the new Acting Deputy Assistant Secretary for the Safety and Security Program (EM-20) at EM Headquarters and welcomed everyone to the meeting.

35

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QA Corporate Board Meeting QA Corporate Board Meeting Las Vegas, NV March 13, 2008 8:00 am - 5:00 pm Meeting Notes The meeting was held at the OCRWM Yucca Mountain campus, Building 9, Room 915 (See Attachment 1, Agenda). After brief introductions (See Attachment 2, Attendees List) and each participant's expression of expectations for the day, Leo Sain (WSRC) provided his perspectives on the Savannah River Site (SRS). Leo commented on the dwindling number of suppliers and used 9975 as an example of where the vendor had lots of problems and it took considerable effort to keep the vendor on track. Many vendors are now procuring from foreign suppliers, adding additional challenges. He indicated the margin for error is very small, and problems can result in schedule delays and cost

36

Annual Meeting  

Science Journals Connector (OSTI)

...operate daily between the airports and the meeting hotels...Washington Natonal Airport, 4-5 miles from city...approx. $6.00. Dulles InternaionalAiport...Baltimore-Washington International Airport, about 40 miles from...

ARTHUR HERSCHMAN

1981-09-18T23:59:59.000Z

37

2011 Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Fuel Cycle Technologies Annual Review Meeting 1 Fuel Cycle Technologies Annual Review Meeting Transactions Report i Table of Contents Fuel Cycle Technologies Program: Introduction ...................................................... 1 Used Fuel Disposition Campaign ................................................................................ 3 1.1 Used Fuel Disposition Campaign Overview ......................................................................... 4 1.2 Abstract: Review of the Used Fuel Disposition Campaign's Storage and Transportation Research and Development Activities ............................................................................... 7 1.3 Abstract: Generic Repository Concepts and Thermal Analysis for Advanced Fuel

38

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QA CORPORATE BOARD MEETING ACTION ITEMS QA CORPORATE BOARD MEETING ACTION ITEMS AUGUST 27-28, 2009 KNOXVILLE, TN General: 1. EM Federal/Contractor QA Resources Summaries: develop metrics; update numbers semi-annually; HQ should issue more detailed instructions to field sites to ensure that we have a standardized and consistent approach across the EM-complex for reporting QA resources numbers. 2. Send out Corporate Board (CB) follow-up email to Board members (Site Managers); Executive Committee and Project Managers; Working Group Co-Leads; Site QA Managers; and EM-64 staff including the following: a) follow-up action items list and meeting minutes (John Longenecker); b) Revised Participants List; and c) all presentations, including Eric Rozek's briefing. 3. Revise/Complete EM Corporate Board Project Plan: a) Executive

39

Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Minutes of the Summary Minutes of the U.S. Department of Energy (DOE) Secretary of Energy Advisory Board (SEAB) Public Meeting July 19, 2012 Committee Members: William Perry, Chair; Norm Augustine; Ralph Cicerone; Nick Donofrio; Michael McQuade; Matt Rogers; Art Rosenfeld; Sue Tierney; Steven Westly; Daniel Yergin Date and Time: 3:00PM - 4:30PM, July 19, 2012 Location: Teleconference Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Amy Bodette, Designated Federal Officer Alyssa Morrissey, Deputy Designated Federal Officer Meeting Summary SEAB Members convened by teleconference to hear updates from the Building Efficiency and Small Modular Reactor (SMR) Subcommittees. After the Subcommittee reports and questions from the full

40

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

th th Environmental Management Quality Assurance Corporate Board Meeting Minutes September 13, 2010 - Augusta, GA Page 1 of 13 Note: Revised by-laws for the EM QA Corporate Board were approved including the resolution of comments from the last meeting. The revised by-laws are posted at http://www.em.doe.gov/Pages/QACorporateBoard.aspx. Voting Board Members in Attendance (general attendance sheet for the meeting is attached): Brian Anderson - Idaho Brenda Hawks - Oak Ridge Ray Corey - Richland Jack Craig - Savannah River Bud Danielson -Chief of Nuclear Safety T.J. Jackson - EMCBC Steven Krahn (chair) - Headquarters EM-20 Jack Zimmerman - Portsmouth/Paducah Bob Murray (vice-chair) - Headquarters EM-23 No Voting Member Present - Carlsbad

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Minutes of the U.S. Department of Energy (DOE) Secretary of Energy Advisory Board (SEAB) Public Meeting November 14, 2011 Committee Members: William Perry, Chair; Norm Augustine; Ralph Cicerone; John Deutch, Nick Donofrio; Chad Holliday; Michael McQuade; Matt Rogers; Art Rosenfeld; Steven Westly Date and Time: 2:00PM - 2:45PM, November 14, 2011 Location: Teleconference Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Alyssa Morrissey, Designated Federal Officer for the SEAB Committee Renee Stone, Designated Federal Officer for the Shale Gas Subcommittee Meeting Summary SEAB Members convened by teleconference to discuss the Second 90-Day Report of the Shale Gas Subcommittee. John Deutch gave an overview of the report, which was followed by a public comment

42

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

th Environmental Management Quality Assurance Corporate Board Meeting Minutes June 9, 2010 - Chicago, IL Page 1 of 11 Voting Board Members in Attendance (general attendance sheet for the meeting is attached): Brian Anderson - Idaho Robert Brown - Oak Ridge Ray Corey - Richland Jack Craig - Savannah River Bud Danielson -Chief of Nuclear Safety Ralph Holland -Consolidated Business Center Steven Krahn (chair) - Headquarters EM-20 Russell McCallister - Portsmouth/Paducah Bob Murray (vice-chair) - Headquarters EM-23 No Voting Member Present - Carlsbad No Voting Member Present - River Protection Bob Murray discussed the Revision to the EM Corporate QA Board By-Laws which were sent out via email prior to

43

2011 Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Fuel Cycle Technologies Annual Review Meeting 2 Fuel Cycle Technologies Annual Review Meeting Transactions Report i Table of Contents Fuel Cycle Technologies Program: I ntroduction .................................................. 1 Fuel Cycle Options Campaign ................................................................................ 5 1.1 Fuel Cycle Options Campaign Overview ...................................................................................... 6 1.2 Development of the Comprehensive Options List for 2013 Evaluation and Screening ................ 9 1.3 Fuel Cycle Options Offered by Liquid Metal-Cooled Breed and Burn Reactors ....................... 11 1.4 Reducing the Void Coefficient of Reactivity in High-Conversion Water Reactors .................... 13 Advanced

44

Load Management for Industry  

E-Print Network (OSTI)

In the electric utility industry, load management provides the opportunity to control customer loads to beneficially alter a utility's load curve Load management alternatives are covered. Load management methods can be broadly classified into four...

Konsevick, W. J., Jr.

1982-01-01T23:59:59.000Z

45

Load Data and Load Vector Assembly  

Science Journals Connector (OSTI)

Data for loading cases in solid mechanics problems is described. The following external loading factors can be specified: concentrated nodal forces, distributed surface forces, and thermal loading. JavaTM class F...

2010-01-01T23:59:59.000Z

46

Meeting Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Agenda Meeting Agenda Preliminary Agenda March 7, 2012 8:45-9:00 Adam Weber, LBNL Welcome and workshop overview 9:00-9:30 TBD, EERE, OFCT Background, approach, and reversible fuel cells 9:30-9:55 Michael Perry, UTRC Renaissance in flow cells: opportunities 9:55-10:20 Joe Eto, LBNL Energy storage requirements for the smart grid 10:20-10:35 Break 10:35-11:00 Robert Savinell, CWRU Revisiting flow-battery R&D 11:00-11:25 Stephen Clarke, Applied Intellectual Capital Lessons learned and yet to be learned from 20 years in RFB R&D 11:25-11:45 Imre Gyuk, DOE OE Research and deployment of stationary storage at DOE 11:45-12:05 Mark Johnson, DOE ARPA-E Flow cell research in GRIDS 12:05-12:30 Tom Zawodzinski, ORNL and UTK Transitioning fuel-cell technology to RFBs

47

EMAB Meeting- February 2011  

Energy.gov (U.S. Department of Energy (DOE))

Board minutes, transcripts, and presentations from meeting held in Washington, DC for meeting on February 24, 2011.

48

EMAB Meeting- June 2011  

Energy.gov (U.S. Department of Energy (DOE))

Board minutes, transcripts, and presentations from meeting held in Washington, DC for meeting on June 23, 2011.

49

Non-Intrusive Appliance Load Monitoring: Promise and Practice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fraunhofer USA Fraunhofer USA Non-intrusive Appliance Load Monitoring (NIALM): Promise and Practice Michael Zeifman, Ph.D. and Kurt Roth, Ph.D. March 1 st , 2012 Building America Stakeholder Meeting © Fraunhofer USA What Is NIALM?  Non-Intrusive Appliance Load Monitoring  A.k.a. Non-Intrusive Load Monitoring  Main breaker/circuit level  Data acquisition (hardware) and disaggregation algorithms (software) 2 07:00 07:30 08:00 08:30 09:00 09:30 0 200 400 600 800 1000 1200 1400 Time Power, W 07:00 07:30 08:00 08:30 09:00 09:30 0 200 400 Power, W Coffee Maker 07:00 07:30 08:00 08:30 09:00 09:30 0 500 1000 Power, W Refrigerator 07:00 07:30 08:00 08:30 09:00 09:30 0 200 400 Time Power, W TV © Fraunhofer USA NIALM: Interest  Significant growth in U.S. granted patents

50

Energy and Greenhouse Gas Emissions in China: Growth, Transition, and Institutional Change  

E-Print Network (OSTI)

that support more load following and peaking generation withfor natural gas- fired load following and peaking generationneeded less load- following and peaking generation. Growth

Kahrl, Fredrich James

2011-01-01T23:59:59.000Z

51

The 2008 3-Way Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

In R&D, Super X-rays Mark Many Spots In R&D, Super X-rays Mark Many Spots A New Gas Loading System for Diamond Anvil Cells at GSECARS Sidorowicz Named "Supervisor of the Year" SESS 2007: The School for Environmental Sciences with Synchrotrons Art and Science APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed The 2008 3-Way Meeting MARCH 25, 2008 Bookmark and Share The assembled 3WM attendees in the Argonne Bldg. 401 atrium. The 2008 Three-Way Meeting (3WM) between the European Synchrotron Radiation Facility (ESRF), the Super Photon Ring-8 GeV (SPring-8), and the Advanced Photon Source (APS) was held at Argonne on March 18-19, 2008, with more than 20 representatives from each facility. Topics discussed at the meeting

52

16 Load Data Cleansing and Bus Load  

E-Print Network (OSTI)

375 16 Load Data Cleansing and Bus Load Coincidence Factors* Wenyuan Li, Ke Wang, and Wijarn Wangdee 16.1 INTRODUCTION Load curve data refer to power consumptions recorded by meters at certain time intervals at buses of individual substations. Load curve data are one of the most important datasets

Wang, Ke

53

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

th Environmental Management Quality Assurance Corporate Board Meeting Minutes May 1, 2012 - Las Vegas, NV Page 1 of 9 Voting Board Members in Attendance: Randy Kay - Idaho Jason Armstrong - Oak Ridge Ray Corey - Richland Charles Harris - Savannah River Bud Danielson -Chief of Nuclear Safety Jack Craig - EMCBC Matt Moury (chair) - Headquarters EM-40 Jack Zimmerman - Portsmouth/Paducah Bob Murray (vice-chair) - Headquarters EM-43 Courtland Fesmire - Carlsbad Walter Scott - River Protection Introductions Bob Murray noted he would like to start a periodical QA managers call with the sites. This would be to share Lessons Learned and group discussion and not HQ leading the discussions.

54

quarterly meeting | OpenEI Community  

Open Energy Info (EERE)

24 24 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234924 Varnish cache server quarterly meeting Home Kyoung's picture Submitted by Kyoung(155) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White Papers On June 26th, we held the 3rd Quarter GRR Stakeholder Update at the Grand

55

Minimized Space Conditioning Distribution Strategy for Low-load Homes  

Energy.gov (U.S. Department of Energy (DOE))

This presentation was given at the Summer 2012 DOE Building America meeting on July 26, 2012, and addressed the question What are the best HVAC solutions for low-load, high performance homes?"

56

Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

th th Environmental Management Quality Assurance Corporate Board Meeting Minutes November 27, 2012 - Hanford, WA Page 1 of 13 Voting Board Members in Attendance: Randy Kay - Idaho Jay Mullis - Oak Ridge Ray Corey - Richland David Moody - Savannah River Bud Danielson -Chief of Nuclear Safety Jack Craig - EMCBC Matt Moury (chair) - Headquarters EM-40 Cynthia Zvonar- Portsmouth/Paducah (non-voting) Bob Murray (vice-chair) - Headquarters EM-43 Courtland Fesmire - Carlsbad Scott Samuelson- River Protection Introductions (Larry Perkins) Larry Perkins covered the agenda, introductions of Corporate Board voting members, and general announcements. Status/Closure of Current Focus Areas - Focus Area 2 - Resources (Jim Davis) Jim Davis provided the results from the recent resources survey that was provided to the EM site offices. All

57

Kickoff Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Evaluation of Dry Sorbent Evaluation of Dry Sorbent Technology for Pre-Combustion CO 2 Capture (FE-0000465) Carl Richardson URS Group 2013 DOE/NETL CO 2 Capture Technology Meeting Pittsburgh, PA * July 10, 2013 Joe Hirsch Elaine Everitt Bill Steen Carl Richardson M. Rostam-Abadi Hong Lu Yongqi Lu 2 Project Funding & Performance Dates BP1: $ 633,669 BP2: $1,134,602 BP3: $ 916,123 Total: $2,684,394 Funding Distribution by Budget Period 0 250 500 750 1000 FY2010 FY2011 FY2012 Year Dollars, $1,000 ICCI ISGS DOE * Cost Share is 25% * POP is September 2009 through September 2013 3 Project Objectives and Scope of Work Objective * Identify, develop, and optimize engineered sorbents for a process that combines CO 2 capture with the water gas-shift (WGS) reaction Scope of Work

58

DSM Load Growth Through Electrotechnology Application Assistance  

E-Print Network (OSTI)

This paper will discuss how a new "win-win" approach is emerging that improves both customer competitiveness and utility energy sales as both DSM and the utility's relationship with its customers mature. While most DSM resources have been invested...

Merchant, D. G.

59

Electricity Advisory Committee Meeting, March 5-6, 2012 - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Advisory Committee Meeting, March 5-6, 2012 - Meeting Minutes and Transcripts Electricity Advisory Committee Meeting, March 5-6, 2012 - Meeting Minutes and Transcripts...

60

Electricity Advisory Committee Meeting, March 12-13, 2014 - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 12-13, 2014 - Meeting Minutes and Transcripts Electricity Advisory Committee Meeting, March 12-13, 2014 - Meeting Minutes and Transcripts Meeting minutes and transcripts for...

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Electricity Advisory Committee Meeting, June 11-12, 2012 - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Advisory Committee Meeting, June 11-12, 2012 - Meeting Minutes and Transcripts Electricity Advisory Committee Meeting, June 11-12, 2012 - Meeting Minutes and...

62

Electricity Advisory Committee Meeting, June 5-6, 2013 - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5-6, 2013 - Meeting Summaries and Transcripts Electricity Advisory Committee Meeting, June 5-6, 2013 - Meeting Summaries and Transcripts Meeting summaries and transcripts for the...

63

Electricity Advisory Committee Meeting, July 12, 2011 - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 12, 2011 - Meeting Minutes and Transcript Electricity Advisory Committee Meeting, July 12, 2011 - Meeting Minutes and Transcript Meeting minutes and transcript for the July...

64

Electricity Advisory Committee Meeting, June 16-17, 2014 - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16-17, 2014 - Meeting Summaries and Transcripts Electricity Advisory Committee Meeting, June 16-17, 2014 - Meeting Summaries and Transcripts Meeting summaries and transcripts for...

65

Electricity Advisory Committee Meeting, March 10, 2011 - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2011 - Meeting Minutes and Transcript Electricity Advisory Committee Meeting, March 10, 2011 - Meeting Minutes and Transcript Meeting minutes and transcript for the March...

66

Electricity Advisory Committee Meeting, January 24, 2014 - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 24, 2014 - Meeting Summary and Transcript Electricity Advisory Committee Meeting, January 24, 2014 - Meeting Summary and Transcript Meeting summary and transcript for the...

67

Public Outreach committee meeting  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB Public Outreach Committee meeting is open to the public. More information about the conference call will be posted as the meeting approaches.

68

SRS CAB - Meeting Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

SRS CAB Meeting Schedule SRS CAB Meeting Schedule Savannah River Site - Citizens Advisory Board 2013 Schedule To join current Online Meetings or view archived Online Meetings click on the buttons in the right-hand column. CAB Full Board and Combined Committees Meetings are not presented in the Online Meeting format. Instructions for Accessing Committee Meetings Online To request a copy of an archived online meeting, scroll down to the date of the meeting you wish to request, and click on the green "Request Archived Online Meeting" button. Your email browser will open and generate a new email to srscitizensadvisoryboard@srs.gov with the committee meeting you wish to request in the subject line. Please, include your name and mailing address in the body of the email. Once we receive the email, we will send

69

EMAB Meeting- December 2011  

Energy.gov (U.S. Department of Energy (DOE))

Board minutes, transcripts, and presentations from meeting held in Washington, DC on December 5, 2011.

70

Definition: Base Load | Open Energy Information  

Open Energy Info (EERE)

Load Load Jump to: navigation, search Dictionary.png Base Load The minimum amount of electric power delivered or required over a given period at a constant rate.[1] View on Wikipedia Wikipedia Definition Baseload (also base load, or baseload demand) is the minimum amount of power that a utility or distribution company must make available to its customers, or the amount of power required to meet minimum demands based on reasonable expectations of customer requirements. Baseload values typically vary from hour to hour in most commercial and industrial areas. Related Terms electricity generation, power, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in Like Like You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from

71

Electricity Advisory Committee Meeting, December 11, 2008: Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting, December 11, 2008: Meeting Meeting, December 11, 2008: Meeting transcript Electricity Advisory Committee Meeting, December 11, 2008: Meeting transcript Transcript of the Electricity Advisory Committee Meeting held on December 11, 2008 including a discussion and approval of the final energy storage technologies white paper, discussion and approval of the final smart grid white paper, discussion and approval of the final committee report on electricity supply adequacy, and discussion of the year two work plan. Electricity Advisory Committee Meeting, December 11, 2008: Meeting transcript More Documents & Publications Electricity Advisory Committee Meeting, May 20, 2008 (TRANSCRIPT) Electricity Advisory Committee Meeting, September 25, 2008: Transcript Electricity Advisory Committee Meeting, March 10, 2011 - Meeting Minutes

72

Fermilab Users' Meeting, 2009  

NLE Websites -- All DOE Office Websites (Extended Search)

Users Meeting Poster Fermilab Users' Meeting Users Meeting Poster Fermilab Users' Meeting June 3-4, 2009 The annual gathering of the Fermilab Users Organization will be held on June 3-4, 2009. This meeting is an opportunity for discussion of new physics results from the laboratory's experimental program, future initiatives at the lab, and thoughtful presentations from leaders of the scientific policy community. The meeting will also feature selected talks from outstanding young physicists. Topics to be covered at the Users Meeting include: Collider Physics Astro-particle Physics Neutrino Physics Future Plans Full Agenda Registration is now closed. NEW!: Pictures from the 2009 Users' Meeting can be found here. A poster session organized by the GSA will be held on June 3rd in the Atrium. The public lecture at this year's Users' Meeting will be given by Prof. Tom Katsouleas

73

QA Summit Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Summit Meeting Minutes Quality Assurance Summit Meeting Minutes February 17, 2011 - Oak Ridge, TN Page 1 of 9 Introduction by Robert Brown (Deputy Site Manager for Oak Ridge) Robert Brown welcomed everyone to the meeting and provided opening remarks. Logistical Information by Larry Perkins (EM-23) Larry Perkins provided the logistics for the meeting and noted that the meeting presentations materials and meeting minutes will be made available online at http://www.em.doe.gov/Pages/QACorporateBoard.aspx Opening Remarks for Environmental Management by Dae Chung (EM-2) Dae Chung provided opening remarks and noted that the tank waste costs are ~40% of the life cycle cost. In

74

Electricity Advisory Committee Meeting Notice of Open Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting October 29, 2010: Federal Register Notice Volume 75, No. 192 - Oct. 5, 2010 Electricity Advisory Committee Meeting Notice of Open Meeting October 29, 2010: Federal Register...

75

Electricity Advisory Committee Meeting Notice of Open Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting March 10, 2011: Federal Register Notice Volume 76, No. 38 - Feb. 25, 2011 Electricity Advisory Committee Meeting Notice of Open Meeting March 10, 2011: Federal Register...

76

Load sensing system  

DOE Patents (OSTI)

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast

Sohns, Carl W. (Oak Ridge, TN); Nodine, Robert N. (Knoxville, TN); Wallace, Steven Allen (Knoxville, TN)

1999-01-01T23:59:59.000Z

77

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

meeting (May), but to meet Ecology's submittal timeline, the committee agreed to review the summary and adopt it via email. Ecology will include the final meeting summary...

78

NARUC Summer Committee Meetings  

Office of Energy Efficiency and Renewable Energy (EERE)

At the NARUC Summer Committee Meetings, you will meet utility regulators from every State in the U.S., along with federal and international officials. This is a wonderful opportunity for learning...

79

Presenting posters at meetings  

Science Journals Connector (OSTI)

I love posters because, at their best, they are ... for which there are certain criteria. Many posters at many meetings do not meet the criteria, largely because the authors of the posters have had misleading (or...

William F. Whimster MA; MD (Cantab); FRCP (Lond); FRCPath

1997-01-01T23:59:59.000Z

80

Loading margin Stable operating  

E-Print Network (OSTI)

Linear approximation at p1 Actual loading margin Loadingmargin Parameter p p1 p2 p3 IEEE Transactions collapse. Linear and quadratic estimates to the variation of the loading margin with respect to any sys power support, wheeling, load model param- eters, line susceptance, and generator dispatch. The accuracy

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

130517 - Public Meeting - Notepad  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

517 - Public Meeting 517 - Public Meeting 1 2 3 4 5 6 7 REPORTER'S TRANSCRIPT OF SCOPING MEETING 8 9 RE: U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY 10 ENVIRONMENTAL ASSESSMENT PUBLIC SCOPING MEETING 11 12 WEDNESDAY, AUGUST 26, 2008 13 JACUMBA, CALIFORNIA 14 15 16 17 18 19 20 21 22 REPORTED BY REGINA L. GARRISON, CSR NO. 12921 23 24 25

82

Meetings and Societies  

Science Journals Connector (OSTI)

...importance was the meeting of the British Nuclear...interest shown in this meeting is well indicated...audience, more than 2000 members being present...take part in the meeting. These overseas...attract the most public interest. The unique...rejection of the Hanford-type of pile as...

1957-03-08T23:59:59.000Z

83

Sensible and Latent Cooling Load Control Using Centrally-Ducted, Variable-Capacity Space Conditioning Systems in Low Sensible Load Environments  

Energy.gov (U.S. Department of Energy (DOE))

This presentation was given at the Summer 2012 DOE Building America meeting on July 26, 2012, and addressed the question What are the best HVAC solutions for low-load, high performance homes?"

84

Dehumidification and cooling loads from ventilation air  

SciTech Connect

The importance of controlling humidity in buildings is cause for concern, in part, because of indoor air quality problems associated with excess moisture in air-conditioning systems. But more universally, the need for ventilation air has forced HVAC equipment (originally optimized for high efficiency in removing sensible heat loads) to remove high moisture loads. To assist cooling equipment and meet the challenge of larger ventilation loads, several technologies have succeeded in commercial buildings. Newer technologies such as subcool/reheat and heat pipe reheat show promise. These increase latent capacity of cooling-based systems by reducing their sensible capacity. Also, desiccant wheels have traditionally provided deeper-drying capacity by using thermal energy in place of electrical power to remove the latent load. Regardless of what mix of technologies is best for a particular application, there is a need for a more effective way of thinking about the cooling loads created by ventilation air. It is clear from the literature that all-too-frequently, HVAC systems do not perform well unless the ventilation air loads have been effectively addressed at the original design stage. This article proposes an engineering shorthand, an annual load index for ventilation air. This index will aid in the complex process of improving the ability of HVAC systems to deal efficiently with the amount of fresh air the industry has deemed useful for maintaining comfort in buildings. Examination of typical behavior of weather shows that latent loads usually exceed sensible loads in ventilation air by at least 3:1 and often as much as 8:1. A designer can use the engineering shorthand indexes presented to quickly assess the importance of this fact for a given system design. To size those components after they are selected, the designer can refer to Chapter 24 of the 1997 ASHRAE Handbook--Fundamentals, which includes separate values for peak moisture and peak temperature.

Harriman, L.G. III [Mason-Grant, Portsmouth, NH (United States); Plager, D. [Quantitative Decision Support, Portsmouth, NH (United States); Kosar, D. [Gas Research Inst., Chicago, IL (United States)

1997-11-01T23:59:59.000Z

85

TEC Meetings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meetings Meetings TEC Meetings TEC would meet twice per year to identify and discuss issues of concern regarding DOE transportation activities. Issues included planning for transportation, communications, Tribal issues, emergency preparedness, training, and funding. The following is a listing of TEC meeting venues and dates. Meeting related documents are available through 1997. TEC MEETING SUMMARIES February 6, 2008 TEC Meeting Summaries - February 2008 TEC Meeting summary and related documents from meeting held in San Antonio, Texas July 24, 2007 TEC Meeting Summaries - July 2007 TEC Meeting summary and related documents from meeting held in Kansas City, Missouri January 31, 2007 TEC Meeting Summaries - January - February 2007 TEC Meeting summary and related documents from meeting held in Atlanta,

86

Meetings & Minutes  

NLE Websites -- All DOE Office Websites (Extended Search)

Fiscal Year 2011 NSSAB Meetings Fiscal Year 2011 NSSAB Meetings Meetings, Minutes and Handouts Date Type Time Location Agenda Handouts Minutes Oct 5, 2010 NNSS Tour 8 am NNSS N/A N/A N/A Nov 2, 2010 Soils /Industrial Sites Committee Meeting 3:00-6:00 pm DOE Nevada Support Facility 232 Energy Way (Searchlight Room) Las Vegas, NV 89030 Agenda Handouts Minutes Nov 10, 2010 Full Board Meeting 5 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda Handouts Minutes Dec 13, 2010 Soils /Industrial Sites Committee Meeting 3:00-6:00 pm DOE Nevada Support Facility 232 Energy Way (Searchlight Room) Las Vegas, NV 89030 Agenda Handouts Minutes Jan 12, 2011 Full Board Meeting 5 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda Handouts Minutes

87

ALS User Meeting Archives  

NLE Websites -- All DOE Office Websites (Extended Search)

User Meeting Archives Print User Meeting Archives Print Past User Meeting Agendas, Workshops, and Awards Year Agenda Workshops David A. Shirley (Science) Klaus Halbach (Instrumentation) Tim Renner (Service) 2012 2012 User Meeting Agenda 2012 User Meeting Workshops 2012 ALS User Meeting Awards Carl Percival, Dudley Shallcross, Craig Taatjes and David Osborn (Sandia), for making the first direct measurements of the reactions of Criegee intermediates, and showing that their impact on tropospheric chemistry and climate may be substantially greater than previously assumed. 2012 ALS User Meeting Awards Jeff Dickert and Simon Morton of Berkeley Lab's Physical Biosciences Division for the invention and implementation of the Compact Variable Collimator (CVC), which has led to a dramatic increase in productivity of protein crystallography.

88

ALS User Meeting Archives  

NLE Websites -- All DOE Office Websites (Extended Search)

ALS User Meeting Archives ALS User Meeting Archives Past User Meeting Agendas, Workshops, and Awards Year Agenda Workshops David A. Shirley (Science) Klaus Halbach (Instrumentation) Tim Renner (Service) 2012 2012 User Meeting Agenda 2012 User Meeting Workshops 2012 ALS User Meeting Awards Carl Percival, Dudley Shallcross, Craig Taatjes and David Osborn (Sandia), for making the first direct measurements of the reactions of Criegee intermediates, and showing that their impact on tropospheric chemistry and climate may be substantially greater than previously assumed. 2012 ALS User Meeting Awards Jeff Dickert and Simon Morton of Berkeley Lab's Physical Biosciences Division for the invention and implementation of the Compact Variable Collimator (CVC), which has led to a dramatic increase in productivity of protein crystallography.

89

Cluster-Based Load Balancing Algorithms for Grids  

E-Print Network (OSTI)

E-science applications may require huge amounts of data and high processing power where grid infrastructures are very suitable for meeting these requirements. The load distribution in a grid may vary leading to the bottlenecks and overloaded sites. We describe a hierarchical dynamic load balancing protocol for Grids. The Grid consists of clusters and each cluster is represented by a coordinator. Each coordinator first attempts to balance the load in its cluster and if this fails, communicates with the other coordinators to perform transfer or reception of load. This process is repeated periodically. We analyze the correctness, performance and scalability of the proposed protocol and show from the simulation results that our algorithm balances the load by decreasing the number of high loaded nodes in a grid environment.

Payli, Resat Umit; Dagdeviren, Orhan

2011-01-01T23:59:59.000Z

90

Load regulating expansion fixture  

DOE Patents (OSTI)

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

Wagner, L.M.; Strum, M.J.

1998-12-15T23:59:59.000Z

91

Load regulating expansion fixture  

DOE Patents (OSTI)

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

1998-01-01T23:59:59.000Z

92

Load sensing system  

DOE Patents (OSTI)

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast inventories of stored nuclear material can be continuously monitored and inventoried of minimal cost. 4 figs.

Sohns, C.W.; Nodine, R.N.; Wallace, S.A.

1999-05-04T23:59:59.000Z

93

Logs / Meeting Minutes Index  

NLE Websites -- All DOE Office Websites (Extended Search)

Logs / Meeting Minutes Logs / Meeting Minutes This page supplies links to the various logs and meeting minutes that are pertinent to the UES Group. FC Shift Log An ORACLE database tool used by the Floor Coordinators to record events that occur on the Experiment Hall Floor. FC Shift Log (Pubic View) Members of the APS Computer Network can use this link to view the FC Shift Log. MCR Shift Log An ORACLE database tool used by the MCR Operators to record events that occur relating to the operation of the Accelerating Systems. MCR Operator Message History The MCR Operator message for the past 72 hours are recorded for reference. UES Meeting Minutes The weekly User ESH Support group meeting minutes are recorded for reference. Also included are AOD-EOS and AOD-EFO meeting minutes. APS Radiation Safety PnP Committee Minutes

94

WECS - load controlled pitch - variable load conversion to heat. Final report  

SciTech Connect

Load control circuitry was developed such that excess energy from a windmill, that would normally go back to the utility, be absorbed in thermal storage to heat domestic hot water. Also, associated with this objective is the development of instrumentation to measure the power curve of the windmill as a function of windspeed. An Enertech 4KW windmill and related equipment was used to meet this objective.

Secord, N.

1983-11-26T23:59:59.000Z

95

Loads Providing Ancillary Services: Review of International Experience-- Technical Appendix: Market Descriptions  

E-Print Network (OSTI)

support the deferral of capital expenditure for load growth-capacity sufficiency, capital expenditure priorities, levelDNSPs) to retain capital expenditures avoided through

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-01-01T23:59:59.000Z

96

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QUALITY ASSURANCE CORPORATE BOARD MEETING QUALITY ASSURANCE CORPORATE BOARD MEETING Augusta, Georgia March 19, 2009 Key Workshop Objectives: 1. Provide Board Members a Summary of Actions Accomplished since the last Corporate Board Meeting in November 2008. 2. Review and Discuss the EM/EFCOG Project Action Plan Working Groups' Progress and Completed Deliverables. 3. Provide Briefings on Quality Assurance Lessons Learned for Discussion. Desired Outcomes: 1. Board Members Vote on EM/EFCOG Quality Assurance Improvement Initiative Project Plan Deliverables. 2. Board Members Vote on Proposed EM Standard QA Contract Language. 3. Select Location and Date for Next EM QA Corporate Board Meeting.

97

Essential Services Meeting Summary  

SciTech Connect

This summary of proceedings report focuses on an end-of-grant meeting at which grantees for Project Area 5 were convened.

HCTT CHE

2010-03-01T23:59:59.000Z

98

Energy Innovations DOE Meeting  

Energy.gov (U.S. Department of Energy (DOE))

Leo Breton, representing Energy Innovations of Washington, DC, a small company engaged in improving the energy efficiency of appliances, automobiles, and HVAC systems, requested a meeting with DOE...

99

CEE Winter Program Meeting  

Energy.gov (U.S. Department of Energy (DOE))

Consortium for Energy Efficiency (CEE) is hosting their Winter Program Meeting, a two-day conference held in Long Beach, California.

100

ARM - Meetings and Events  

NLE Websites -- All DOE Office Websites (Extended Search)

Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance Meetings and Events Scientists from around the world use the ARM...

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Scenario Analysis Meeting  

Energy.gov (U.S. Department of Energy (DOE))

Presentation by Sigmund Gronich at the 2010-2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles and Infrastructure meeting on January 31, 2007.

102

Final Meeting Summary ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Health, Safety, and Environmental Protection Committee November 8, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE November...

103

BROMEX Logistics Meeting plan  

E-Print Network (OSTI)

BROMEX Logistics Meeting plan Fairbanks, Alaska 22-23 Feb 2011 #12;22 Feb 2011 ­ Photo taken by Son

Rigor, Ignatius G.

104

ASD All Hands Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

periodic walkthroughs - Observe and verify work performed according to expectation - Document walkthroughs - ESH 139 John Schmerge SPEAR3 AD All Hands Meeting November 24,...

105

Public Outreach Committee Meeting  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB Public Outreach Committee meeting is open to the public. For more information about participating, call (865) 241-4583.

106

Quadrennial Energy Review Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting October 6, 2014 Humayun Tai Senior Partner, McKinsey & Company Bankability of Electricity Transmission, Storage and Distribution Infrastructure Secretary Moniz and...

107

Meetings | Department of Energy  

Office of Environmental Management (EM)

in industry meetings and events. Additionally, the Office participates in the biennial Peer Review process, an evaluation mandated by EERE. The Peer Review process entails a...

108

OPSI Annual Meeting  

Energy.gov (U.S. Department of Energy (DOE))

The Organization of PJM States, Inc. (OPSI) is hosting its annual meeting in Chicago, IL, on October 13-14, 2014.

109

What are the Best HVAC Solutions for Low-Load, High Performance Homes?"  

Energy.gov (U.S. Department of Energy (DOE))

This presentation was given at the Summer 2012 DOE Building America meeting on July 26, 2012, and addressed the question What are the best HVAC solutions for low-load, high performance homes?"

110

CRITICAL LOADS OF ACIDITY FOR FOREST SOILS AND RELATIONSHIP TO FOREST DECLINE IN THE NORTHERN  

E-Print Network (OSTI)

of Czech Republic, Germany and Poland meet (b). Critical load modeling involves mass balance calculations/Al. In the mass balance calculations, the chemical criterion is set to a critical limit, which is `the most

Ardö, Jonas

111

Predicting pipeline frost load  

SciTech Connect

A study was undertaken to find a formula for predicting the additional load imposed on underground pipelines by soil freezing. The authors conclude that a modified Boussinesq equation can be used to assess this load. Results also showed that frost affects the modulus of soil reaction and therefore the induced stress in flexible pipe.

Fielding, M.B.; Cohen, A.

1988-11-01T23:59:59.000Z

112

load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

113

UDAC Meetings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ultra-Deepwater Advisory Ultra-Deepwater Advisory Committee » UDAC Meetings UDAC Meetings November 27, 2013 UDAC Meeting - December 2013 Federal Register Notice for December 16, 2013 UDAC Meeting UDAC 2014 Findings and Recommendations November 20, 2013 UDAC Meeting - December 2013 Federal Register Notice for December 9, 2013 UDAC Meeting Federal Register Notice for December 9, 2013 UDAC Meeting Meeting documents UDAC Sunset Subcommittee Findings and Recommendations UDAC R&D Program Subcommittee Findings and Recommendations November 18, 2013 UDAC Meeting - September 2013 September 17, 2013 Presentations from the WebEx meeting October 2, 2013 UDAC Meeting - October 2013 Federal Register Notice for October 8, 2013 UDAC Meeting The 24th Meeting of the Ultra-Deepwater Advisory Committee (UDAC),

114

Chairs Meetings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chairs Chairs Meetings Chairs Meetings November 5, 2013 Chairs Meeting - November 2013 EM SSAB minutes, agenda, and presentations from meeting held in Mount Sterling, OH April 4, 2013 Chairs Meeting - April 2013 EM SSAB minutes, agenda, and presentations from webinar October 2, 2012 Chairs Meeting - October 2012 EM SSAB minutes, agenda, and presentations from meeting held in Washington, DC April 18, 2012 Chairs Meeting - April 2012 EM SSAB minutes, agenda, and presentations from meeting held in Paducah, Kentucky October 20, 2011 Chairs Meeting - October 2011 EM SSAB minutes, agenda, and presentations from meeting held in Washington, DC June 15, 2011 Chairs Meeting - June 2011 EM SSAB minutes, agenda, and presentations from meeting held in North Las Vegas, Nevada September 15, 2010

115

Meet with Large Businesses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meet with Large Businesses Meet with Large Businesses and learn about upcoming acquisitions! * Federal Energy Management Program (FEMP) * National Renewable Energy Laboratory (NREL) * Small Business Administration (SBA) * U.S. Department of Energy / Energy, Efficiency, and Renewable Energy (EERE) * U.S. Department of Energy / Golden Field Office (GFO) * Western Area Power Administration (WAPA) * Colorado Procurement Technical Assistance Center (PTAC)

116

Meetings and Societies  

Science Journals Connector (OSTI)

...River from the Hanford plant (at considerably...SCIENCE, VOL. 124 Meetings and Societies 'tlhe...depositsand nearly 2000 million years...could become a public health hazard...De-partment of Tropical Public Health, Harvard School of Public Health; v. pres...society's national meeting in Los An-geles...

1956-11-23T23:59:59.000Z

117

A Distinctly European Meeting  

Science Journals Connector (OSTI)

It’s been called “the AAAS meeting of Europe,” in reference to the annual meeting of the American Association for the Advancement of Science. And although that’s true in a sense, the biennial Euroscience Open Forum (ESOF)—in its short, eight-year history—...

WILLIAM G. SCHULZ

2012-08-27T23:59:59.000Z

118

Scalable Load Distribution and Load Balancing for Dynamic Parallel Programs  

E-Print Network (OSTI)

shown that the algorithm scales according to the definition of scalability given following. LoadScalable Load Distribution and Load Balancing for Dynamic Parallel Programs E. Berger and J. C of an integrated load distribution-load balancing algorithm which was targeted to be both efficient and scalable

Berger, Emery

119

Meeting Decisions and Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Notices Meeting Decisions & Documents Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally Meeting Decisions and Documents Print E-mail This page summarizes the decisions made by the National Climate Assessment Development and Advisory Committee (NCADAC) and the documents the committee has adopted in association with those decisions. The documents and decisions concern the operation of the committee, the content of the synthesis report(s), the sustained assessment process, and other important guidance and responsibilities. The full and official meeting records of the NCADAC are available on a dedicated NOAA page. To view the Federal Register notices announcing the meetings of the NCADAC, please click here.

120

Public Scoping Meeting Materials  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Scoping Meeting Materials Public Scoping Meeting Materials Public Scoping Meeting Materials Fact sheets, presentations, and other information from the Conversion EIS Public Scoping Meetings. The following materials were made available during the DUF6 Conversion EIS public scoping meetings held near Portsmouth, Ohio, Oak Ridge, Tennessee, and Paducah, Kentucky, November - December, 2001. Notice of Intent PDF Icon Notice of Intent to Prepare an Environmental Impact Statement for Depleted Uranium Hexafluoride Conversion Facilities 60 KB details Presentation PDF Icon Overview: Depleted Uranium Hexafluoride (DUF6) Management Program 5.97 MB details DUF6 Fact Sheets PDF Icon Overview of Depleted Uranium Hexafluoride Management Program 174 KB details PDF Icon NEPA Activities for the Depleted Uranium Hexafluoride Management Program

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Fermilab Users' Meeting, 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

6-7, 2007 6-7, 2007 The annual gathering of the Fermilab Users Organization will be held on June 6-7, 2007. This meeting is an opportunity for discussion of new physics results from the laboratory's experimental program, future initiatives at the lab, and thoughtful presentations from leaders of the scientific policy community. Topics to be covered at the Users Meeting include: Collider Physics Astro-particle Physics Neutrino Physics Future Plans This year, both an Outreach Workshop and a Grad Students' Meeting / Career Night (sponsored by the GSA) will be held in association with the Users Meeting on June 5. Watch this page for links to more information on those associated meetings as they become available. Registration Reserve Tickets (for the public lecture by Dr. George Smoot)

122

2011 Fuel Cycle Technologies Annual Review Meeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Fuel Cycle Technologies Annual Review Meeting 1 Fuel Cycle Technologies Annual Review Meeting 2011 Fuel Cycle Technologies Annual Review Meeting As the largest domestic source of low-carbon energy, nuclear power is making major contributions toward meeting our nation's current and future energy demands. The United States must continue to ensure improvements and access to this technology so we can meet our economic, environmental and energy security goals. We rely on nuclear energy because it provides a consistent, reliable and stable source of base load electricity with an excellent safety record in the United States. To support nuclear energy's continued and expanded role in our energy platform, therefore, the United States must continually improve its knowledge, technology, and policy in order to:

123

Jeddah Energy Meeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jeddah Energy Meeting Jeddah Energy Meeting Jeddah Energy Meeting June 20, 2008 - 1:29pm Addthis Remarks as Prepared for Secretary Bodman Thank you, Minister Naimi . . . and my sincere thanks to King Abdullah and the Saudi government for hosting this event. Everyday -- and around the world -- we are seeing the significant negative effects that high energy prices have on our economies, our industries and, most profoundly, on our citizens. We face an extraordinary set of circumstances that demands responsible action from producing and consuming nations alike. Market fundamentals show us that production has not kept pace with growing demand for oil, resulting in increasing - and increasingly volatile - prices. Since 2003 global demand, fed by worldwide economic growth, has increased

124

Jeddah Energy Meeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jeddah Energy Meeting Jeddah Energy Meeting Jeddah Energy Meeting June 20, 2008 - 1:29pm Addthis Remarks as Prepared for Secretary Bodman Thank you, Minister Naimi . . . and my sincere thanks to King Abdullah and the Saudi government for hosting this event. Everyday -- and around the world -- we are seeing the significant negative effects that high energy prices have on our economies, our industries and, most profoundly, on our citizens. We face an extraordinary set of circumstances that demands responsible action from producing and consuming nations alike. Market fundamentals show us that production has not kept pace with growing demand for oil, resulting in increasing - and increasingly volatile - prices. Since 2003 global demand, fed by worldwide economic growth, has increased

125

Southeastern Federal Power Alliance Meetings | Department of...  

Energy Savers (EERE)

About Us Southeastern Federal Power Alliance Southeastern Federal Power Alliance Meetings Southeastern Federal Power Alliance Meetings Meeting Documents Available for...

126

NTSF 2014 Meeting Agenda | Department of Energy  

Office of Environmental Management (EM)

2014 Meeting Agenda NTSF 2014 Meeting Agenda Spring 2014 National Transportation Stakeholder Forum Meeting Agenda NTSF 2014 Meeting Agenda More Documents & Publications NTSF Spring...

127

Johnson Controls: Meeting Minutes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Minutes Johnson Controls: Meeting Minutes Meeting with DOEOMB Officials on Advanced Technology Vehicle Loan Program Johnson Controls: Meeting Minutes More Documents &...

128

Electricity Advisory Committee - 2014 Meetings | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Advisory Committee - 2014 Meetings Electricity Advisory Committee - 2014 Meetings Electricity Advisory Committee - 2014 Meetings SEPTEMBER 24 & 25, 2014 MEETING OF THE...

129

Electricity Advisory Committee (EAC) - Archived Meetings 2008...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

(EAC) - Archived Meetings 2008 - 2014 Electricity Advisory Committee (EAC) - Archived Meetings 2008 - 2014 Past meetings of the Electricity Advisory Committee (EAC) 2014 Meetings:...

130

Electricity Advisory Committee (EAC) - 2013 Meetings | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 Meetings Electricity Advisory Committee (EAC) - 2013 Meetings MARCH 6 & 7, 2013 MEETING OF THE ELECTRICITY ADVISORY COMMITTEE This meeting was cancelled due to an expected...

131

HLW Glass Waste Loadings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HLW HLW Glass Waste Loadings Ian L. Pegg Vitreous State Laboratory The Catholic University of America Washington, DC Overview Overview  Vitrification - general background  Joule heated ceramic melter (JHCM) technology  Factors affecting waste loadings  Waste loading requirements and projections  WTP DWPF  DWPF  Yucca Mountain License Application requirements on waste loading  Summary Vitrification  Immobilization of waste by conversion into a glass  Internationally accepted treatment for HLW  Why glass?  Amorphous material - able to incorporate a wide spectrum of elements over wide ranges of composition; resistant to radiation damage  Long-term durability - natural analogs Relatively simple process - amenable to nuclearization at large  Relatively simple process - amenable to nuclearization at large scale  There

132

Buildings Stock Load Control  

E-Print Network (OSTI)

: An assembly of the various blocks of the library of simbad and simulink permit to model building. Finally the last part prensents the study results: Graphs and tables to see the load shedding strategies impacts....

Joutey, H. A.; Vaezi-Nejad, H.; Clemoncon, B.; Rosenstein, F.

2006-01-01T23:59:59.000Z

133

National Hydrogen Vision Meeting Proceedings  

Fuel Cell Technologies Publication and Product Library (EERE)

This document provides presentations and summaries of the notes from the National Hydrogen Vision Meeting''s facilitated breakout sessions. The Vision Meeting, which took place November 15-16, 2001, k

134

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Solar Radiative Influences on Drop Growth Solar Radiative Influences on Drop Growth Harrington, J.Y, Hartman, C., and Verlinde, J., The Pennsylvania State University Thirteenth Atmospheric Radiation Measurement (ARM) Science Team Meeting The offsetting effects of solar heating and infrared cooling on the vapor-depositional growth of cloud droplets is investigated. In this study, a marine stratocumulus cloud was simulated by using a large eddy simulation (LES) model and a detailed microphysical bin model. Including infrared cooling as well as solar heating had two effects. The first effect is related to the fact that vapor-depositional growth of drops is radius dependent - solar heating effects dominated at larger drop sizes (> 100 microns) and infrared cooling effects dominated at smaller drop sizes

135

Composite Load Model Evaluation  

SciTech Connect

The WECC load modeling task force has dedicated its effort in the past few years to develop a composite load model that can represent behaviors of different end-user components. The modeling structure of the composite load model is recommended by the WECC load modeling task force. GE Energy has implemented this composite load model with a new function CMPLDW in its power system simulation software package, PSLF. For the last several years, Bonneville Power Administration (BPA) has taken the lead and collaborated with GE Energy to develop the new composite load model. Pacific Northwest National Laboratory (PNNL) and BPA joint force and conducted the evaluation of the CMPLDW and test its parameter settings to make sure that: • the model initializes properly, • all the parameter settings are functioning, and • the simulation results are as expected. The PNNL effort focused on testing the CMPLDW in a 4-bus system. An exhaustive testing on each parameter setting has been performed to guarantee each setting works. This report is a summary of the PNNL testing results and conclusions.

Lu, Ning; Qiao, Hong (Amy)

2007-09-30T23:59:59.000Z

136

Only tough choices in Meeting growing demand  

SciTech Connect

U.S. electricity demand is not growing very fast by international or historical standards. Yet meeting this relatively modest growth is proving difficult because investment in new capacity is expected to grow at an even slower pace. What is more worrisome is that a confluence of factors has added considerable uncertainties, making the investment community less willing to make the long-term commitments that will be needed during the coming decade.

NONE

2007-12-15T23:59:59.000Z

137

Load Monitoring CEC/LMTF Load Research Program  

SciTech Connect

This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

2007-11-30T23:59:59.000Z

138

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEETING MEETING Knoxville, Tennessee August 27-28, 2009 Key Workshop Objectives: 1. Provide Board Members a Summary of Actions Accomplished since the last Corporate Board Meeting in March 2009. 2. Review and Discuss the EM/EFCOG Quality Assurance Improvement Project Action Plan Focus Areas' Progress and Completed Deliverables. 3. Obtain industry and DOE perspectives on concerns and lessons learned pertaining to Counterfeit, Suspect, and Fraudulent Items and Commercial Grade Dedication. Desired Outcomes: 1. Vote by Board members on EM/EFCOG Quality Assurance Improvement Initiative Project Plan Deliverables for FY 2009. 2. Develop EM/EFCOG QA Improvement Project Plan Work Scope for FY 2010.

139

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM QUALITY ASSURANCE CORPORATE BOARD MEETING EM QUALITY ASSURANCE CORPORATE BOARD MEETING Atlanta, Georgia November 13 -14, 2008 Key Workshop Objectives: 1. Provide Board Members an Overview and Progress Accomplished with Actions from the 2 nd Corporate Board Meeting on July 29-20, 2008. 2. Review and Discuss the EM/EFCOG Project Action Plan Working Groups' Progress and Completed Deliverables. 3. Provide Briefings on Quality Assurance Lessons Learned for Discussion. 4. Discuss with Board Members the Results and Lessons Learned of the EM QA Corporate Performance Metrics Pilot Tests. Desired Outcomes: 1. Executive Corporate Board Members Vote on EM/EFCOG Quality Assurance Improvement Initiative Project Plan Deliverables.

140

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

June 5, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATION COMMITTEE June 5, 2013 Richland, WA Topics in this Meeting Summary Opening...

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

October 11, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE October 11, 2012 Richland, WA Topics in this Meeting Summary...

142

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

August 9, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE August 9, 2012 Richland, WA Topics in this Meeting Summary Opening...

143

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE October 7, 2014 Richland, WA Topics in this Meeting Summary Opening ......

144

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

March 5, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITEE March 5, 2014 Kennewick, WA Topics in this Meeting Summary Welcome and Introduction...

145

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

September 3, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITTEE September 3, 2014 Pasco, WA Topics in this Meeting Summary Welcome ......

146

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

October 8, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE October 8, 2014 Richland, WA Topics in this Meeting Summary Opening ......

147

UDAC Meetings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting minutes and Federal Register Notice for UDAC June 21, 2007 Meeting previous 1 2 next Petroleum Reserves International Cooperation Natural Gas Regulation Advisory Committees...

148

ARM - Science Team Meeting Proceedings  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications Science Team Meeting Proceedings Science Team Meeting Proceedings Note: For proper viewing,...

149

IRC Meeting Feb. 6, 2013  

E-Print Network (OSTI)

IRC Meeting Feb. 6, 2013 Minutes Members present: Bill Crow, Steve Futch, Keith Schneider Meeting. Minutes respectively submitted by Stephen H. Futch Chair of committee #12;

Jawitz, James W.

150

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

March 6, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 6, 2013 Richland, WA Topics in this Meeting Summary Opening ......

151

SPE Western Regional Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UDAC Calendar and Next Steps UDAC Calendar and Next Steps Elena Melchert Committee Manager Ultra-Deepwater Advisory Committee February 23, 2011 Ultra-Deepwater Advisory Committee  Committee Calendar - February/March 2011: Subcommittee meetings - April 6-7, 2011, 8am-5pm, 15 th UDAC Meeting in Houston, TX - April 8, 2011: Editing Subcommittee meets to prepare final report of UDAC comments and recommendations - April 16, 2011, Editing Subcommittee sends final report to the Committee Manager for distribution to the UDAC members - April 19, 2011, 10:00 am CDT, 16 th UDAC Meeting, Conference Call in Washington, DC to vote on Editing Subcommittee report - April 26, 2011 Chair sends UDAC final report of comments & recommendations to the Designated Federal Officer for delivery to the Secretary of Energy

152

Meeting Summary Notes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Transportation Stakeholders Forum (NTSF) National Transportation Stakeholders Forum (NTSF) May 26, 2010 Meeting Summary Notes Opening Remarks - Steve O'Connor, DOE Office of Packaging and Transportation Steve O'Connor, DOE/EM Office of Packaging and Transportation welcomed the group to this first National Transportation Stakeholders Forum (NTSF) and thanked the planning committee and the dedication of the Midwest Council of State Government for hosting the meeting. The NTSF will focus on transportation across the DOE complex. Mr. O'Connor announced that the meeting would be recorded and questions for the panel could either be written down and passed to the session moderator or asked via the central microphone. Planners for the meeting have worked to ensure a more engaging panel format and to minimize the use of formal presentations. Mr. O'Connor

153

Meetings & Minutes  

NLE Websites -- All DOE Office Websites (Extended Search)

3 NSSAB Meetings 3 NSSAB Meetings Join Us at a NSSAB Meeting! All NSSAB Full Board meetings are open to the public. Date Type Time Location Agenda Handouts Minutes Oct 10, 2012 Orientation 1 pm â€" 6 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda Handouts N/A Nov 14, 2012 NNSS Tour for Members Full Day Nevada National Security Site N/A Handouts N/A Nov 26, 2012 Membership Committee 3 p.m. West Career and Technical Academy West Charleston Blvd NV 89135 Agenda Handouts Minutes Nov 28, 2012 Full Board 5 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda Handouts Minutes Jan 16, 2013 Full Board 5 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda Handouts Minutes

154

KC TEC Meeting Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 24-25, 2007 July 24-25, 2007 Kansas City, Missouri U.S DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP MEETING July 24-25, 2007 Kansas City, Missouri Welcome and Meeting Overview The U.S. Department of Energy (DOE), Transportation External Coordination Working Group (TEC) held its 28th meeting on July 24-25, 2007, in Kansas City, Missouri. One hundred sixty-six participants, representing national, state, tribal, and local government; industry; professional organizations; and other interested parties, met to address a variety of issues related to DOE's radioactive materials transportation activities. In terms of the number of attendees, this was the largest TEC meeting ever held. The TEC process includes the involvement of these key stakeholders in developing solutions to

155

Meetings & Minutes  

NLE Websites -- All DOE Office Websites (Extended Search)

4 NSSAB Meetings 4 NSSAB Meetings Join Us at a NSSAB Meeting! All NSSAB Full Board meetings are open to the public. Date Type Time Location Agenda Handouts Minutes Oct 2, 2013 Orientation 1 pm â€" 6 pm Sahara West Library 9600 West Sahara Road Las Vegas, NV 89117 Agenda Handouts N/A Nov 20, 2013 Educational Session, “Cultural Resources and American Indian Consultation at the NNSSâ€? 4 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 N/A Handouts N/A Nov 20, 2013 Full Board 5 p.m. Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda Handouts Minutes January 22, 2014 NNSS Tour for Members Full Day Nevada National Security Site N/A N/A N/A Feb 19, 2014 Full Board 5 p.m. Beatty Community Center

156

ORSSAB monthly board meeting  

Energy.gov (U.S. Department of Energy (DOE))

Board members and participants will hear a presentation and updates about the "Y-12 Mercury Cleanup Strategy and Plan for a Y-12 Water Treatment Plant." The meeting is open to the public.

157

ORSSAB monthly board meeting  

Energy.gov (U.S. Department of Energy (DOE))

The ORSSAB monthly board meeting is open to the public. The board will hear a presentation and discuss the development of a comprehensive mercury strategy for the Oak Ridge Reservation.

158

QER Stakeholder Meeting  

Energy Savers (EERE)

Written summation QER Stakeholder Meeting June 19, 2014 Adnan Mansour, PhD GE Power & Water, Water & Process Technologies Email: Adnan.Mansour@ge.com Phone: 1 215 633 4120...

159

Electricity Advisory Committee Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kimberly Matthews-Williams, DOE Office of Executive Resources Brian Plesser, Attorney Advisor, DOE Office of General Counsel 12:00 to 1:00 pm EAC Leadership Committee Meeting...

160

NARUC Annual Meeting  

Energy.gov (U.S. Department of Energy (DOE))

The National Association of Regulatory Utility Commissioneers (NARUC) is hosting its annual meeting in San Fransisco, CA, from Nov. 16-19, 2014. Registration and housing begins Aug. 27. 

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Liquefaction contractors' review meeting  

SciTech Connect

Papers presented at the Liquefaction Contractor's Review Meeting are grouped in the proceedings under indirect liquefaction, AR and TD, and direct liquefaction. Individual papers have been processed separately for inclusion in the Energy Science and Technology base. (AT)

Stiegel, G.J. (USDOE Pittsburgh Energy Technology Center, PA (United States)); Srivastava, R.D. (Burns and Roe Services Corp., Pittsburgh, PA (United States)) (eds.)

1991-01-01T23:59:59.000Z

162

Electricity Advisory Committee Meeting Notice of Open Meeting October 29,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Meeting October 29, 2010: Federal Register Notice Volume 75, No. 192 - Oct. 5, 2010 Electricity Advisory Committee Meeting Notice of Open Meeting October 29, 2010: Federal Register Notice Volume 75, No. 192 - Oct. 5, 2010 Electricity Advisory Committee Meeting. This notice announces a meeting of the reestablished Electricity Advisory Committee (EAC) on October 29, 2010. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. Electricity Advisory Committee Meeting: Notice of Open Meeting October 29, 2010 More Documents & Publications Electricity Advisory Committee Notice of Open Meeting October 19 and 20, 2011: Federal Register Notice Volume 76, No. 187 - Sep. 27, 2011

163

Electricity Advisory Committee Meeting Notice of Open Meeting March 10,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting March Meeting March 10, 2011: Federal Register Notice Volume 76, No. 38 - Feb. 25, 2011 Electricity Advisory Committee Meeting Notice of Open Meeting March 10, 2011: Federal Register Notice Volume 76, No. 38 - Feb. 25, 2011 Electricity Advisory Committee Meeting. This notice announces a meeting of the reestablished Electricity Advisory Committee (EAC) on March 10, 2011. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. Electricity Advisory Committee Meeting: Notice of Open Meeting March 10, 2011. More Documents & Publications EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement Electricity Advisory Committee Notice of Open Meeting October 19 and 20,

164

Focus Group Training Work Group Meeting  

Energy.gov (U.S. Department of Energy (DOE))

Meeting agenda, summary and proposed Radworker Training Reciprocity Program Meeting Dates: July 10 - 11

165

Characterization of Rivastigmine Loaded Chitosan  

E-Print Network (OSTI)

cholinesterase inhibitors (ChEI). In present study rivastigmine loaded chitosan-tripolyphosphate nanoparticles

Simar Preet Kaur; Rekha Rao; Afzal Hussain; Sarita Khatkar

166

Bridge Monitoring and Loading  

E-Print Network (OSTI)

#12;1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling simulations were conducted for a range of stone arch bridges spanning 5.0m to 32m. Traditional assessment procedures for the determination of both longitudinal and transverse bridge strengths were developed

167

Bridge Monitoring and Loading  

E-Print Network (OSTI)

1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling and Assessment dimensional non- linear finite element simulations of a range of stone arch- bridges spanning 5.0m to 32m and novel assessment proce- dures for the determination of both longitudinal andtrans- verse bridge

168

Load Management Made Simple  

E-Print Network (OSTI)

Company have moved to a demand side or load management mode which seeks to influence customers to change electric usage patterns to more efficiently use available generating capacity. Since 1970, the TUEC system peak demand has more than doubled from about...

Schneider, K.

1985-01-01T23:59:59.000Z

169

Muon Collaboration Friday Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Collaboration Friday Meetings Collaboration Friday Meetings Muon Collaboration Friday Meetings are held at Fermilab, in the Snakepit (WH 2E), at 1:30 pm CDT/CST on most Fridays. An audio bridge is available, details are in the meeting notice. To receive the weekly meeting notice, either join the NuMu-Collaboration-l mailing list or send email to Terry Hart (look me up in the FNAL Phonebook). 13-NOV-2009 Agenda Zisman.pdf 30-OCT-2009 Agenda Bross.ppt Ankenbrandt.ppt 22-OCT-2009 Agenda Fernow_1.pdf Fernow_2.pdf Snopok.pdf Palmer.pdf 16-OCT-2009 Agenda News Alexahin.ppt Alexakhin.pdf 9-OCT-2009 Agenda Yonehara.ppt 8-OCT-2009 Agenda Kirk.pdf 1-OCT-2009 Agenda Lamm.pdf 25-SEP-2009 Agenda Fernow.pdf 24-SEP-2009 Agenda 18-SEP-2009 Derun.pptx 17-SEP-2009 popovic.ppt 10-SEP-2009 Action_items.doc Bross.ppt Agenda 4-SEP-2009 Kaplan.pdf

170

the uva meets china the uva meets china6 7 The UvA meets China  

E-Print Network (OSTI)

the uva meets china the uva meets china6 7 The UvA meets China Amsterdam University Press 9789089646156 The UvA meets China Collaboration with China has been designated a key strategic target contributions by various authors from both China and the Netherlands, particularly Amsterdam, on a wide range

van Rooij, Robert

171

2012 Fuel Cycle Technologies Annual Review Meeting Transaction Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fuel Cycle Technologies Annual Review Meeting Transaction Fuel Cycle Technologies Annual Review Meeting Transaction Report 2012 Fuel Cycle Technologies Annual Review Meeting Transaction Report The United States must continue to ensure improvements and access to this technology so we can meet our economic, environmental and energy security goals. We rely on nuclear energy because it provides a consistent, reliable and stable source of base load electricity with an excellent safety record in the United States. In order to continue or expand the role for nuclear power in our long- term energy platform, the United States must: Continually improve the safety and security of nuclear energy and its associated technologies worldwide. Develop solutions for the transportation, storage, and long-term disposal of used nuclear fuel and associated wastes.

172

DOE Meeting Memorandum: Ex Parte Communications | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Memorandum: Ex Parte Communications Meeting Memorandum: Ex Parte Communications DOE Meeting Memorandum: Ex Parte Communications Big Ass Fans is headquartered in Lexington, Kentucky, and designs and manufactures a variety of fan models for commercial, industrial and residential use. BAF met with DOE to discuss the ongoing rulemaking process for the commercial and industrial fans and blowers energy conservation standards, docket EERE-2013-BT-STD-0006, and for residential ceiling fans energy conservation standards, docket number EERE-2012-BT-STD-0045. 6-4-13 BAF DOE Meeting Memorandum.pdf DOE Reduced Size.pdf More Documents & Publications Track C - Market-Driven Research Solutions Energy Savers Guide Critical Question #4: What are the Best Off-the-Shelf HVAC Solutions for Low-Load, High-Performance Homes and Apartments?

173

recreate load le Rick Whitman  

E-Print Network (OSTI)

is an example of an initial unexpanded fos load le. It loads data for the le: u-init-y.cy0 u data for the le: e-init-y.cy0 2 #12;e-next-y.lod - this is an expanded fos load which uses erecreate load le Rick Whitman November 27, 1996 Usage The tool is invoked by entering recreate load

Sirianni, Marco

174

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QUALITY ASSURANCE CORPORATE BOARD MEETING QUALITY ASSURANCE CORPORATE BOARD MEETING Denver, Colorado July 29 -30, 2008 Key Workshop Objectives: 1. Inform Board Members of Ongoing and Future EM QA Initiatives. 2. Review and Discuss the Draft EM/EFCOG Project Action Plan for the Top Five Priority Issues Identified by Site Federal and Contractor Executives in 1 st EM QA Board Meeting in March 2008. 3. Brief and Discuss with Board Members the Proposed EM Corporate Performance Metrics System Concept and Approach. 4. Review the Progress of EM HQ and Sites to Establish QA Managers and to Allocate Adequate QA Resources. Desired Outcomes: 1. Executive Board Members Vote on Draft EM/EFCOG Project Action

175

2009 PDSF Meeting Minutes  

NLE Websites -- All DOE Office Websites (Extended Search)

2009 PDSF Users Meeting Minutes December 22 PDSF Users Meeting 12/22/09 Attending: Eric and Jay from PDSF and users Andrei, Marjorie, and Jeff P. Cluster status: Utilization has been relatively light, mostly STAR and some ATLASUCI jobs. Outages: Discussed slowness caused by atlasusi jobs and the possibility of making /common read-only but no decision on how to do that was reached. The issue of using the NERSC global homes was also discussed as a possibility in the future. Upcoming downtimes: System-wide outage has been rescheduled for... December 8 PDSF Users Meeting 12/8/09 Attending: Eric and Jay from PDSF and users Andrew, Jeff P., Marjorie, Doug, Keith and Jeff A. Cluster status: Utilization has been relatively light, mostly STAR and some ATLASUCI jobs. Outages: There were two problems on 12/7. In the morning

176

Notice of Public Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

[6450-01-P] [6450-01-P] DEPARTMENT OF ENERGY 10 CFR Parts 429 and 430 (Docket No. EERE-2012-BT-TP-00xx) Test Procedure Guidance for Room Air Conditioners, Residential Dishwashers, and Residential Clothes Washers: Public Meeting AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of public meeting. SUMMARY: The U.S. Department of Energy (DOE) is holding a public meeting to provide a forum for manufacturers and test laboratories to discuss their respective interpretations of existing DOE test procedures, where they believe that the test procedures lack clarity, and to provide information for DOE to consider prior to publishing any proposed guidance to clarify the current test procedures for room air conditioners, residential dishwashers, and residential clothes

177

Electricity Advisory Committee Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Meeting June 11 and 12, 2012 Capital Hilton Hotel, 16 th and K Streets, NW, Washington, DC Final Agenda June 11, 2012 1:30 to 2:00 pm Registration 2:00 to 2:30 pm Welcome, Introductions and Developments since our March 2012 meeting Richard Cowart, EAC Chair and David Meyer, EAC Designated Federal Official 2:30 to 2:50 pm Update on the U.S. Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability's (OE) 2012 Current Programs and Initiatives - Honorable Patricia Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, U.S. Department of Energy - Anjan Bose, Senior Advisor to the Undersecretary of Energy 2: 50 to 3:10 pm Strategic Plan for DOE OE - Presentation

178

FY 2010 Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Fiscal Year 2010 NSSAB Meetings Fiscal Year 2010 NSSAB Meetings Meetings, Minutes and Handouts Date Type Time Location Agenda Handouts Minutes Oct 1, 2009 Industrial Sites EMAD Tour All Day Nevada Test Site N/A N/A Minutes Oct 20, 2009 UGTA Committee 2 pm DOE Nevada Support Facility 232 Energy Way (Sedan Room) Las Vegas, NV 89030 Agenda N/A Minutes Oct 21, 2009 Trans/Waste Committee 2:30 - 4:30 pm Frank H. Rogers Building 755 E. Flamingo Rd Las Vegas, NV 89119 Agenda N/A Minutes Nov 3, 2009 Industrial Sites Committee 1 - 3 pm Summerlin Library 1771 Inner Circle Dr. Las Vegas, NV 89134 Agenda N/A Minutes Nov 3, 2009 Membership Committee 9:45 am - 4:30 pm Summerlin Library 1771 Inner Circle Dr. Las Vegas, NV 89134 N/A N/A Minutes Nov 4, 2009 Membership Committee 1:45 - 5:30 pm

179

JGI User Meeting 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

Second Annual Second Annual DOE Joint Genome Institute User Meeting Marriott Hotel Walnut Creek, California March 28-30, 2007 The U.S. Department of Energy Joint Genome Institute (JGI) welcomed its users and collaborators, as well as prospective new users, to the second annual JGI User Meeting. This international gathering of researchers with an interest in sequence-based science offered three days of user presentations, tours, workshops, and poster sessions. This was a unique opportunity to meet fellow users and JGI staff. Sessions and posters in the fields of microbial genomics, microbial communities, eukaryotic genomics, and genome technologies were presented. ©2006-2007, The Regents of the University of California. Last updated May 9, 2007. Disclaimer | Webmaster Agenda

180

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEETING MEETING Meeting Location: 9950 Covington Cross Drive, Las Vegas, Nevada 89144 Building/Room: BSC Office Building/Conference Rm. 915 March 13, 2008: 8:00 am - 5:00 pm AGENDA March 13, 2008 8:00- 8:30 COFFEE ALL 8:30 - 8:45 Welcome and Opening Remarks Dae Chung Leo Sain (WSRC) I 8:45 - 9:00 Introduction of Board Members ALL 9:00 - 10:00 EM QA Initiatives Sandra Waisley * New Office of Standards and Quality Bob Murray Assurance (EM-64) * EM QA Initiatives - Overview - EM Centralized Training Platform Concept Discussion/Feedback - QA System Evaluation Process and Declaration Criteria 10:15 Break ALL 10:30 QA Corporate Board Vision Sandra Waisley * Overview and Discussion of Final Draft Charter/By-Laws * Finalize Board By-Laws (Vote) 11:30 LUNCH

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 TH EM QUALITY ASSURANCE CORPORATE BOARD MEETING Meeting Location: Richland, WA - Office of River Protection Room: 2440 Stevens Center - Room 2311 Agenda for November 27, 2012 12:30-12:40 Introductions/Status of Actions from the Last Meeting Larry Perkins (EM-43) 12:40-1:10 Status/Closure of Current Focus Areas * Focus Area 2 (Resources) * Focus Area 3 (Training) Jim Davis (EM-43) Ken Armstrong (EMCBC) 1:10-2:10 EM QA Corporate Board Approach and Focus Matt Moury (EM-40) Bob Murray (EM-43) 2:10-2:20 Break ----- 2:20-2:50 EFCOG Current Efforts in QA Mike Hassell (EFCOG) 2:50-3:20 NQA-1 Committee Update Bud Danielson (CNS) 3:20-3:50 Transportation and Packaging Issue with Recent ASME NQA-1 Interpretation Steve O'Connor (EM-33) 3:50-4:00 Break -----

182

Meeting the Air Leakage  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting the Air Leakage Meeting the Air Leakage Requirements of the 2012 IECC The U.S. Department of Energy (DOE) recognizes the enormous potential that exists for improving the energy efficiency, safety and comfort of homes. The newest edition of the International Energy Conservation Code ® (IECC) (2012) sets the bar higher for energy efficiency, and new air sealing requirements are one of the key new provisions. This guide is a resource for understanding the new air leakage requirements in the 2012 IECC and suggestions on how these new measures can be met. It also provides information from Building America's Air Sealing Guide, Best Practices and case studies on homes that are currently meeting the provisions. The 2012 IECC and a few International Residential Code (IRC) requirements are referenced throughout the guide.

183

SRS CAB - Meeting Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Full Board Meetings January 23-24, 2012 Agenda Presentations Perceptions & Perspectives of ENVIRONMENTAL JUSTICE Facilities Disposition & Site Remediation Committee Report Update on H Canyon Annual Integrator Operable Unit (IOU) Program Update Nuclear Materials Committee Natural Resources Management Plan for the Savannah River Site, May 2005 Saltstone Enhancements System Plan Revision 17 Inputs and Assumptions Thank you for your service on the Board 2012 CAB Topics for Consideration Waste Management Committee FY 2012 Environmental Management Program Funding Meeting Minutes March 26-27, 2012 Agenda Presentations Enterprise SRS Solving Global Challenges NNSA SRS Overview Environmental Management Program Funding Lower Three Runs Integrator Operable Unit (IOU) Early Action Update

184

Carbon Sequestration - Public Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Meeting Programmatic Environmental Impact Statement Public Meeting May 18, 2004 National Energy Technology Laboratory Office of Fossil Energy Scott Klara Carbon Sequestration Technology Manager Carbon Sequestration Program Overview * What is Carbon Sequestration * The Fossil Energy Situation * Greenhouse Gas Implications * Pathways to Greenhouse Gas Stabilization * Sequestration Program Overview * Program Requirements & Structure * Regional Partnerships * FutureGen * Sources of Information What is Carbon Sequestration? Capture can occur: * at the point of emission * when absorbed from air Storage locations include: * underground reservoirs * dissolved in deep oceans * converted to solid materials * trees, grasses, soils, or algae Capture and storage of CO 2 and other Greenhouse Gases that

185

Corporate Board Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

th th Environmental Management Quality Assurance Corporate Board Meeting Minutes February 16, 2011 - Oak Ridge, TN Page 1 of 17 Voting Board Members in Attendance (general attendance sheet for the meeting is attached): *Greg Hayward - Idaho Robert Brown - Oak Ridge Ray Corey - Richland *Bill Rowland - Savannah River Bud Danielson -Chief of Nuclear Safety T.J. Jackson - EMCBC Ken Picha (chair) - Headquarters Acting EM-20 Russell McCallister - Portsmouth/Paducah Bob Murray (vice-chair) - Headquarters EM-23 No Voting Member Present - Carlsbad Jonathan (JD) Dowell - River Protection *Note: The by-laws require the voting member to be the Site Manager or assistant/deputy manager. The noted

186

Federal Technical Capability Program - Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

FTCP Meetings FTCP Meetings FTCP Conference Call Schedule - CY 2013 Face to Face Meeting: May 22, 2013 Agenda Meeting Minutes Meeting Briefings Face to Face Meeting: September 18, 2012 Agenda FAQS Status NTC Activities - NTC Briefing - NTC's 2012 Safety Training Delivery Schedule - NTC's 2013 Safety Training Delivery Schedule Competency Development & Critical Skills (Eric Coleman) - GAO Report - Modernizing the Nuclear Security Enterprise - DOE Occupational Competency Models DOE Management and Operations -- Strategic Perspective (VADM Melvin Williams) - Executive Summary - Management and Operations - IMS Executive Summary - DOE’s Integrated Management System - Leaders Influence Culture and Performance FTCP FY 2012 FTCP Operational Plan Goal Status - Goal 1 FTCP FY 2012 FTCP Operational Plan Goal Status - Goal 2

187

FY 2008 Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Fiscal Year 2008 Meetings Fiscal Year 2008 Meetings Meetings, Minutes and Handouts Date Type Time Location Agenda Handouts Minutes Nov 6, 2007 EMPIRE Committee 2:30 - 3:45 p.m. 821 E. Amargosa Farm Road Amargosa Valley, NV 89020 Fact Sheet Review n/a Minutes Nov 6, 2007 Budget Committee 4 - 5 p.m. 821 E. Amargosa Farm Road Amargosa Valley, NV 89020 FY 2008 Budget Update Handouts Minutes Nov 6, 2007 Full Board Meeting 6 p.m. 821 E. Amargosa Farm Road Amargosa Valley, NV 89020 Agenda Handouts Minutes Nov 27, 2007 Transportation/Waste Committee 3 p.m. Conference call Transportation Routes n/a Minutes Jan 10, 2008 EMPIRE Committee 3:15 - 4:15 Bob Ruud Community Center 150 Hwy 160, Pahrump, NV n/a n/a Minutes Jan 10, 2008 Outreach Ad Hoc Committee 4:30 - 5:30 Bob Ruud Community Center 150 Hwy 160, Pahrump, NV n/a n/a Minutes

188

Meetings and Societies  

Science Journals Connector (OSTI)

...Chicago, Chicago, Illinois Meeting Notes * The...v) mechanism of chemical carcinogenesis of...information write to F. Dow Smith, Director...Westinghouse Bettis Plant-W3R-N, P.O...Bellrose, Jr. (Illinois Natural History Survey...America, annual, Madison, Wis. (Miss J...

1956-08-10T23:59:59.000Z

189

Meetings and Societies  

Science Journals Connector (OSTI)

...Optometry, annual, Houston, Tex. (C. C. Koch, 1506 Foshay Tower, Minneapolis 2. Minn.) SCIENCE, VOL. 124 Conquest of the...Automotive Engineers, annual, Detroit, Mich. (Meetings Div., SAE, 29 W. 39 St., New York 18.) 14-20. Indian Science Cong...

1956-11-09T23:59:59.000Z

190

Meetings and Societies  

Science Journals Connector (OSTI)

...annual, Chicago, Ill. (C. C. Koch, 1506-1508 Foshay Tower, Minneapolis 2, Minn.) 5-7. Texas Acad. of Science...Automotive Engi-neers, annual, Detroit, Mich. (Meetings Div., SAE, 29 W. 39 St., New York 18.)22-24. American Council...

1957-11-08T23:59:59.000Z

191

Meetings and Societies  

Science Journals Connector (OSTI)

...Panama, Guate-mala; E. E. Howe, Merck and Company; D. B. Tower, National Institutes of Health; and J. B. Allison, Rutgers...Automotive Engineers, annual, Detroit, Mich. (Meetings Div., SAE, 29 W. 39 St., New York 18.) 14-20. Indian Science Cong...

1956-12-14T23:59:59.000Z

192

RAS ANNUAL GENERAL MEETING:  

Science Journals Connector (OSTI)

......been appointed as Scrutineers of the Ballot for Offi- cers and Council for the ensuing year. The meeting then agreed to pro- ceed to the ballot and, after an interval, approved its closure. The Narrative Report of Council for the year 1996 was presented......

Minutes of the 177th AGM: of 9 May 1997

1997-01-01T23:59:59.000Z

193

Meeting Recognition Thomas Hain  

E-Print Network (OSTI)

in the same room w In general, two interaction observers are used in o check on reliability. Two Interaction interaction observers are used in o check on reliability. Two Interaction Recorders are av numbers on holders;Meeting capture Illustration 1. Discussion group from observers' vantage point. Illustration 2. Discussion

Hain, Thomas

194

load profile | OpenEI Community  

Open Energy Info (EERE)

data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

195

Ad Hoc Meetings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ad Hoc Meetings Ad Hoc Meetings Ad Hoc Meetings 43.pdf More Documents & Publications Radio and Spectrum Management ICAM Workshop PKI Workshop...

196

Spring 2015 National Transportation Stakeholders Forum Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 National Transportation Stakeholders Forum Meeting, New Mexico Spring 2015 National Transportation Stakeholders Forum Meeting, New Mexico Save the Date The spring 2015 meeting...

197

QA Corporate Board Meeting - February 2010 (Teleconference) ...  

Office of Environmental Management (EM)

QA Corporate Board Meeting - February 2010 (Teleconference) QA Corporate Board Meeting - February 2010 (Teleconference) 6thEM Quality Assurance Corporate Board Meeting Agenda for...

198

Stanford Geothermal Workshop 2012 Annual Meeting | Department...  

Energy Savers (EERE)

2012 Annual Meeting Stanford Geothermal Workshop 2012 Annual Meeting Presentation slides for the Stanford Geothermal Workshop Annual Meeting presentation by Doug Hollett,...

199

EEI Environment Meetings Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EEI Environment Meetings Presentation EEI Environment Meetings Presentation EEI Environment Meetings Presentation More Documents & Publications U.S. Energy Association Presentation...

200

Spring 2008 ASA Meeting Disclaimer  

U.S. Energy Information Administration (EIA) Indexed Site

8 Meeting of the 8 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's spring 2008 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place on April 9, 2008 in the Forrestal Building at 1000 Independence Ave., S.W., Washington, D.C. 20585. All sessions were plenary and were held in room 8E-089. The spring meeting agenda, papers, presentation slides and other materials may be found at: http://www.eia.gov/smg/asa_meeting_2008/spring/index.html

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

132nd AAAS ANNUAL MEETING  

Science Journals Connector (OSTI)

...of the Committee on Meetings and AAAS Section A-Mathematics...will preside. "Public investment in optimal...Association. *. The AAAS public information staff for the Berkeley meeting will include Edward...Local Committee on Public Information is headed...

1965-12-03T23:59:59.000Z

202

Meeting Federal Energy Security Requirements  

Energy.gov (U.S. Department of Energy (DOE))

Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

203

2011 CAMD Users Meeting Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

in Morning Session) 5:15 - CUC Meeting - Members of CUC meet in CAMD conference room; elect chair, chair-elect and carry out business 5:00 - 6:00pm - Poster Session in Experiment...

204

Midwest Hydro Users Group Meeting  

Energy.gov (U.S. Department of Energy (DOE))

The Midwest Hydro Users Group will be holding their annual Fall meeting on November 12th and 13th in Wausau, Wisconsin.  An Owners-only meeting on the afternoon of the 12th followed by a full...

205

The Communicative Creation of Meetings: An Interaction Analysis of Meeting Thought Units and Meeting Activities in Three Natural Meeting Contexts  

E-Print Network (OSTI)

Research on meeting interaction often reads like a how-to book, as both academic and popular literature focus primarily on normative, prescriptive strategies designed to produce effective meeting outcomes. Unfortunately, ...

Beck, Stephenson John

2008-07-18T23:59:59.000Z

206

Load Management: Opportunity or Calamity?  

E-Print Network (OSTI)

larger now than prior to 1973. Utilities are examining two options which can be termed load management. One option is to control discretionary loads during peak periods. Cycling of residential water heaters or shutting off industrial electric furnaces...

Males, R.; Hassig, N.

1981-01-01T23:59:59.000Z

207

Commission Meeting- October 6, 2014  

Energy.gov (U.S. Department of Energy (DOE))

This was the third meeting of the Commission to Review the Effectiveness of the National Energy Labs.

208

Variable loading roller  

DOE Patents (OSTI)

An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves in the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first. 14 figs.

Williams, D.M.

1988-01-21T23:59:59.000Z

209

Electricity Advisory Committee Meeting, January 24, 2014- Meeting Summary and Transcript  

Energy.gov (U.S. Department of Energy (DOE))

Meeting summary and transcript for the January 24, 2014 meeting of the Electricity Advisory Committee.

210

The Inaugural Meeting of the President's Council on Jobs and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inaugural Meeting of the President's Council on Jobs and Inaugural Meeting of the President's Council on Jobs and Competitiveness The Inaugural Meeting of the President's Council on Jobs and Competitiveness February 24, 2011 - 12:17pm Addthis John Schueler John Schueler Former New Media Specialist, Office of Public Affairs Editor's Note: This event has concluded. Today, Secretary Chu heads to the White House to participate in the first meeting of the President's Council on Jobs and Competitiveness. The Council, whose members represent various sectors of the economy, will discuss how we can promote economic growth, spark innovation, create new jobs and invest in American industry so we can out-compete the rest of the world. John Schueler is a New Media Specialist with the Office of Public Affairs. Addthis Related Articles

211

Deputy Secretary Daniel Poneman's Remarks at IFNEC Meeting in Warsaw,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IFNEC Meeting in IFNEC Meeting in Warsaw, Poland - As Prepared for Delivery Deputy Secretary Daniel Poneman's Remarks at IFNEC Meeting in Warsaw, Poland - As Prepared for Delivery September 29, 2011 - 12:00pm Addthis Thank you, Madame Chairwoman Trojanowska. On behalf of the United States government, I would like to extend my sincere appreciation to the Government of Poland for hosting and chairing the 2011 International Framework for Nuclear Energy Cooperation Executive Committee meeting. Nuclear energy provides the world with hundreds of thousands of megawatts of clean, reliable, low-carbon power, and it has an important role to play as we work to achieve our global objectives to strengthen energy security, to spur economic growth and job creation, and to protect the environment.

212

NERSC User Group Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC User Group Meeting NERSC User Group Meeting Oct 18, 2010 Outline * About OpenMP * Parallel Regions * Worksharing Constructs * Synchronization * Data Scope * Tasks * Using OpenMP at NERSC 2 3 Common Architectures * Shared Memory Architecture - Multiple CPUs share global memory, could have local cache - Uniform Memory Access (UMA) - Typical Shared Memory Programming Model: OpenMP, Pthreads, ... * Distributed Memory Architecture - Each CPU has own memory - Non-Uniform Memory Access (NUMA) - Typical Message Passing Programming Model: MPI, ... * Hybrid Architecture - UMA within one SMP node - NUMA across nodes - Typical Hybrid Programming Model: mixed MPI/OpenMP, ... What is OpenMP * OpenMP is an industry standard API of C/C++ and Fortran for shared memory parallel programming.

213

Draft TF Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEETING OF THE FEDERAL SMART GRID TASK FORCE March 26, 2009 Location: Department of Commerce 1401 Constitution Ave, NW, Washington DC 20230 Room 4830 8:30 Opening and Introduction * Call the meeting to order, around-the-table introductions, and review of the agenda - Eric Lightner, DOE 8:40 Update from DOE OE - Eric Lightner * ARRA Activities * Federal Smart Grid Taskforce Factsheet * Smart Grid clearinghouse status * Smart Grid maturity model status EERE - Steve Lindenberg, Dan Ton * ARRA Activities 9:20 Update from FERC - Ray Palmer, David Andrejcak * Status of FERC-NARUC Collaborative on Smart Grid 9:40 Update from DOC NIST - William Anderson, Jerry FitzPatrick * Status of Smart Grid Interoperability efforts ITA - Man Cho, Robin Roarke

214

Manhattan Project: Berkeley Meeting  

Office of Scientific and Technical Information (OSTI)

Resources Resources About this Site How to Navigate this Site Library Maps Note on Sources Nuclear Energy and the Public's Right to Know Photo Gallery Site Map Sources and Notes Suggested Readings BERKELEY MEETING University of California, Berkeley (March 29, 1940) Resources > Photo Gallery Lawrence, A. Compton, Bush, Conant, K. Compton, and Loomis A meeting regarding the 184-inch cyclotron project, held at the University of California, Berkeley, on March 29, 1940. Left to right: Ernest O. Lawrence, Arthur H. Compton, Vannevar Bush, James B. Conant, Karl T. Compton, and Alfred L. Loomis. The photograph is reprinted in Richard G. Hewlett and Oscar E. Anderson, Jr., The New World, 1939-1946: Volume I, A History of the United States Atomic Energy Commission (Washington: U.S. Atomic Energy Commission, 1972), opposite page 33.

215

Electricity Advisory Committee Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 5 and 6, 2013 June 5 and 6, 2013 NRECA Building, Arlington, VA 1 Wednesday, June 5, 2013 12:00 to 1:00 pm EAC Leadership Committee Meeting 12:00 to 1:00 pm Registration Public Signups for Comments on Day 2 1:00 to 1:15 pm Welcome and Developments since our October 2012 Meeting Sonny Popowsky, EAC Vice Chair and David Meyer, EAC Designated Federal Officer 1:15 to 1:45 pm Update on the U.S. Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability's (OE) 2013 Programs and Initiatives Honorable Patricia Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, U.S. Department of Energy 1:45 to 2:35 pm EAC Race to the Top Initiative Working Group Discussion Sonny Popowsky, Working Group Chair

216

Electricity Advisory Committee Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 6 and 7, 2013 March 6 and 7, 2013 NRECA Building, Arlington, VA 1 March 6, 2013 12:15 to 1:15 pm EAC Leadership Committee Meeting 12:15 to 1:15 pm Registration Public Signups for Comments on Day 2 1:15 to 1:30 pm Welcome and Developments since our October 2012 Meeting Richard Cowart, EAC Chair and David Meyer, EAC Designated Federal Officer 1:30 to 2:00 pm Update on the U.S. Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability's (OE) 2013 Programs and Initiatives Honorable Patricia Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, U.S. Department of Energy 2:00 to 2:30 pm Briefing on Special DOE Initiative: Race to the Top Holmes Hummel, U.S. Department of Energy 2:30 to 2:50 pm EAC Member Discussion of DOE's Race to the Top Initiative

217

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M M a n a g e m e n t Quality Assurance Corporate Board Meeting June 9, 2010 Chicago, Illinois 7 th EM Quality Assurance Corporate Board Meeting June 9, 2010 Chicago, Illinois Table of Contents 1. Agenda 2. By-Laws (Distributed for Board Vote via Email) 3. Focus Area Distribution (Distributed for Board Vote via Email) 4. Draft Project Plan for Current Focus Areas 5. Overview of Current Corporate Quality Assurance Issues, Challenges, and Priorities 6. Industry Perspective 7. Technical Approach to Implement NQA-1 Suppliers Focus Area 8. Technical Approach to Implement CGD Focus Area 9. Technical Approach to Implement Design Quality Assurance Focus Area 10. Proposed Technical Approach for Grading QA for Deactivation & Decommissioning

218

2011 NTSF Meeting Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 National Transportation Stakeholders Forum Denver, Colorado May 11-12, 2011 Meeting Summary Notes The second annual meeting of the National Transportation Stakeholders Forum (NTSF) was held in Denver, Colorado, and was hosted by the Western Governors' Association. Day 1, May 11, 2011 OPENING PLENARY, Keynote: Cynthia Anderson, Chief Operating Officer, Office of Environmental Management, DOE - A Journey to Excellence Ms. Anderson spoke about the Office of Environmental Management's (EM) Journey to Excellence. The mission of EM is to safely transform the environmental legacy of the Cold War into assets available for the Nation's future by completing quality cleanup work on schedule and within cost, delivering demonstrated value to the American taxpayer. Priorities for EM include:

219

Northwest Regional Meeting  

Science Journals Connector (OSTI)

Northwest Regional Meeting ... Organizers are planning symposia on instrumental experiments in the general chemistry laboratory, active learning in chemical education, bio-based products, environmental molecular sciences laboratory user research, green chemistry, Hanford site analytical chemistry, management of the chemical enterprise, noninvasive diagnostics, radioisotopes and radiopharmaceuticals, semiconductor materials, the chemistry of advanced nuclear systems, thermodynamic models in geochemistry, sensors and sensor technology, women in chemistry, agricultural and public health protection chemistry, and public response to chemical exposure emergencies. ...

2007-02-12T23:59:59.000Z

220

Enclosures STC Stakeholder Meeting Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enclosures STC Enclosures STC Residential Energy Efficiency Stakeholder Meeting Wednesday, February 29, 2012 - Austin, Texas Residential Energy Efficiency Stakeholder Meeting Wednesday, February 29, 2012 - Austin, Texas 2 Enclosures STC Agenda 2011 REVIEW IDENTIFY & REVIEW NEW GAPS COLLABORATION & 2012 PLAN QUESTIONS & DISCUSSION STRATEGIC GOALS Residential Energy Efficiency Stakeholder Meeting Wednesday, February 29, 2012 - Austin, Texas 3 Enclosures STC 2011 REVIEW Residential Energy Efficiency Stakeholder Meeting Wednesday, February 29, 2012 - Austin, Texas 4  New + Existing, Single + Multi-Family  ROOFS  WALLS  FOUNDATIONS  FENESTRATIONS  AIRTIGHTNESS  MATERIALS  OTHER Enclosures STC Categories Residential Energy Efficiency Stakeholder Meeting Wednesday, February 29, 2012 -

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ANS 2006 WINTER MEETING & Nuclear Technology Expo  

E-Print Network (OSTI)

ANS 2006 WINTER MEETING & Nuclear Technology Expo "Ensuringthe (TOFE) 5th International Topical Meeting on Nuclear Plant Instrumentation, Controls, and Human Machine for their support of the 2006 ANS Winter Meeting & Nuclear Technology Expo; Embedded Topical Meeting: TOFE 2006

Krings, Axel W.

222

MTS Table Top Load frame  

NLE Websites -- All DOE Office Websites (Extended Search)

MTS Table Top Load frame MTS Table Top Load frame The Non-destructive Evaluation group operates an MTS Table Top Load frame for ultimate strength and life cycle testing of various ceramic, ceramic-matrix (FGI), carbon, carbon fiber, cermet (CMC) and metal alloy engineering samples. The load frame is a servo-hydraulic type designed to function in a closed loop configuration under computer control. The system can perform non-cyclic, tension, compression and flexure testing and cyclic fatigue tests. The system is comprised of two parts: * The Load Frame and * The Control System. Load Frame The Load Frame (figure 1) is a cross-head assembly which includes a single moving grip, a stationary grip and LVDT position sensor. It can generate up to 25 kN (5.5 kip) of force in the sample under test and can

223

Spring 2009 ASA Meeting Disclaimer  

U.S. Energy Information Administration (EIA) Indexed Site

9 Meeting of the 9 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's spring 2009 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place on April 2 and 3, 2009 in the Forrestal Building at 1000 Independence Ave., S.W., Washington, D.C. 20585. All of the plenary and one of the break-out sessions were in room 8E-089. Another breakout session was held in room 5E-069. The spring meeting agenda, papers, presentation slides and other materials

224

Fall 2007 ASA Meeting Disclaimer  

U.S. Energy Information Administration (EIA) Indexed Site

7 Meeting of the 7 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's fall 2007 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place October 18 and 19, 2007 in the Forrestal Building at 1000 Independence Ave., S.W., Washington, D.C. 20585. All of the plenary and three of the break-out sessions were in 8E-089. The three remaining break-out sessions were in 5E-069. The fall meeting agenda, papers, presentation slides and other materials

225

Spring 2008 ASA Meeting Disclaimer  

U.S. Energy Information Administration (EIA) Indexed Site

8 Meeting of the 8 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you will find unedited transcripts of EIA's fall 2008 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings can be found to the right of the Thursday and Friday transcripts. The public meeting took place October 23 and 24, 2008 in the Forrestal Building at 1000 Independence Ave., S.W., Washington, D.C. 20585. All of the plenary and two of the break-out sessions were in 6E-069. The two remaining break-out sessions were in 5E-069. The fall meeting agenda, papers, presentation slides and other materials

226

Oak Ridge Site Specific Advisory Board Meetings  

Energy.gov (U.S. Department of Energy (DOE))

Lists links to the Oak Ridge Site Specific Advisory Board Meetings. The links provide meeting documents available for download.

227

Load Pocket Forecasting Software E. A. Feinberg, D. Genethliou, J.T. Hajagos, B.G. Irrgang, and R. J. Rossin  

E-Print Network (OSTI)

pockets and to modify the existing ones. Index Terms--Load forecasting, power system planning I and load data, estimates weather-normalized electric loads, computes design- day parameters, computes data, extrapolating past load growth patterns into the future. The most common trending method

Feinberg, Eugene A.

228

Measured Peak Equipment Loads in Laboratories  

E-Print Network (OSTI)

of measured equipment load data for laboratories, designersmeasured peak equipment load data from 39 laboratory spacesmeasured equipment load data from various laboratory spaces

Mathew, Paul A.

2008-01-01T23:59:59.000Z

229

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1) Agenda 2) Presentations: a. Welcome, Agenda and any High Priority Issues b. Issuance of DOE O 414.1D - How it Affects EM Sites c. EM Commercial Grade Dedication Guide d. Integration of QA in Design Guidance Document e. Draft Revision to the Standard QA Contract Language f. Operational Awareness - Basic QA Profile Associated with EM Hazard Category 2 and 3 Nuclear Operations g. EFCOG Current Efforts & Relationship to the EM QA Corporate Board Priorities & Focus Areas 3) Commercial Grade Dedication Guidance Document 4) Integration of QA in Design Guidance Document 5) Draft Revision to Standard QA Contract Language 6) Status of Actions from the February 2011 Board Meeting

230

LLW Forum meeting report  

SciTech Connect

This document reports the details of the Quarterly Meeting of the Low- Level Radioactive Waste Forum held in San Diego, California during January 23-25, 1991. Topics discussed include: State and Compact Progress Reports; Legal Updates; Update on Technical Assistance; Advanced Notice of Proposed Rulemaking Regarding Surcharge Rebates; Update on TCC Activities; NRC Update; Disposal of Commercial Mixed Waste; Update on EPA Activities; ACNW Working Group on Mixed Waste; National Profile on Mixed Waste; Commercial Perspective on Mixed Waste; Update on DOT Activities; Source Terms; Materials and Waste; Storage: and Waste Acceptance Criteria and Packaging.

NONE

1991-12-31T23:59:59.000Z

231

Town Hall Meeting October 1st, 2012 | OpenEI Community  

Open Energy Info (EERE)

49 49 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234349 Varnish cache server Town Hall Meeting October 1st, 2012 Home > Blogs > Graham7781's blog Graham7781's picture Submitted by Graham7781(2002) Super contributor 19 September, 2012 - 13:40 OpenEI Town Hall meeting What: OpenEI's town hall meeting is a half-hour open forum for discussions on energy topics with NREL's OpenEI team. Find out how your fellow researchers, students, teachers and energy professionals are using energy

232

Demand Response: Load Management Programs  

E-Print Network (OSTI)

CenterPoint Load Management Programs CATEE Conference October, 2012 Agenda Outline I. General Demand Response Definition II. General Demand Response Program Rules III. CenterPoint Commercial Program IV. CenterPoint Residential Programs... V. Residential Discussion Points Demand Response Definition of load management per energy efficiency rule 25.181: ? Load control activities that result in a reduction in peak demand, or a shifting of energy usage from a peak to an off...

Simon, J.

2012-01-01T23:59:59.000Z

233

Dynamic load balancing of applications  

DOE Patents (OSTI)

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

Wheat, Stephen R. (Albuquerque, NM)

1997-01-01T23:59:59.000Z

234

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

at PSE is to collect load data for validating dynamic and approach decomposes recorded load data into different load “to continuously record load data for a selected time period

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

235

2013 Customer Meeting Handouts  

NLE Websites -- All DOE Office Websites (Extended Search)

Tab 1 Rates and Contracts Presentations - Pages 19 - 32 are also found in Tab 1 Rates and Contracts Presentations - Pages 19 - 32 are also found in Tabs 17 and 18 below but were included as one handout at the meeting. The Rates only portion may be found on the previous page in the link labeled '2013 Customer Meeting Rates Presentation' Tab 2-1 - Repayment milestone Tab 2-2 Collbran SOR Tab 2-3 CRSP SOR Tab 2-4 Dolores SOR Tab 2-5 Rio Grande SOR Tab 2-6 Seedskadee SOR Tab 3-1 SLIPF9 Sum Table Tab 3-2 SLIPF9 Tab 3-3 SP-PTP7 Tab 3-4 SP-NW3 Tab 3-5 SP-NFT6 Tab 3-6 SP-SD3 Tab 3-7 SP-RS3 Tab 3-8 SP-EI3 Tab 3-9 SP-FR3 Tab 3-10 SP-SSR3 Tab 4 SLIP PRS Executive Summary Tab 5 SLIP PRS Backup Study Tab 6 - Revenue Requirements Comparison Table Tab 7-1 Average O&M Comparison Tab 7-2 O&M Budget Projections Tab 8-1 Purchase Power Comparison - 2013

236

High-Power Rf Load  

DOE Patents (OSTI)

A compact high-power RF load comprises a series of very low Q resonators, or chokes [16], in a circular waveguide [10]. The sequence of chokes absorb the RF power gradually in a short distance while keeping the bandwidth relatively wide. A polarizer [12] at the input end of the load is provided to convert incoming TE.sub.10 mode signals to circularly polarized TE.sub.11 mode signals. Because the load operates in the circularly polarized mode, the energy is uniformly and efficiently absorbed and the load is more compact than a rectangular load. Using these techniques, a load having a bandwidth of 500 MHz can be produced with an average power dissipation level of 1.5 kW at X-band, and a peak power dissipation of 100 MW. The load can be made from common lossy materials, such as stainless steel, and is less than 15 cm in length. These techniques can also produce loads for use as an alternative to ordinary waveguide loads in small and medium RF accelerators, in radar systems, and in other microwave applications. The design is easily scalable to other RF frequencies and adaptable to the use of other lossy materials.

Tantawi, Sami G. (San Mateo, CA); Vlieks, Arnold E. (Livermore, CA)

1998-09-01T23:59:59.000Z

237

Application of measured loads to wind turbine fatigue and reliability analysis  

SciTech Connect

Cyclic loadings produce progressive damage that can ultimately result in wind turbine structural failure. There are many issues that must be dealt with in turning load measurements into estimates of component fatigue life. This paper deals with how the measured loads can be analyzed and processed to meet the needs of both fatigue life calculations and reliability estimates. It is recommended that moments of the distribution of rainflow-range load amplitudes be calculated and used to characterize the fatigue loading. These moments reflect successively more detailed physical characteristics of the loading (mean, spread, tail behavior). Moments can be calculated from data samples and functional forms can be fitted to wind conditions, such as wind speed and turbulence intensity, with standard recession techniques. Distributions of load amplitudes that accurately reflect the damaging potential of the loadings can be estimated from the moments at any, wind condition of interest. Fatigue life can then be calculated from the estimated load distributions, and the overall, long-term, or design spectrum can be generated for any particular wind-speed distribution. Characterizing the uncertainty in the distribution of cyclic loads is facilitated by using a small set of descriptive statistics for which uncertainties can be estimated. The effects of loading parameter uncertainty can then be transferred to the fatigue life estimate and compared with other uncertainties, such as material durability.

Veers, P.S. [Sandia National Labs., Albuquerque, NM (United States); Winterstein, S.R. [Stanford Univ., CA (United States)

1997-01-01T23:59:59.000Z

238

Fifteenth LAMPF users group meeting  

SciTech Connect

The Fifteenth LAMPF Users Group Meeting was held November 2-3, 1981 at the Clinton P. Anderson Meson Physical Facility. The program of papers scheduled to be presented was amended to include a Report from Washington by Clarence R. Richardson, US Department of Energy. The general meeting ended with a round-table working group discussion concerning the Planning for a Kaon Factory. Individual items from the meeting were prepared separately for the data base.

Cochran, D.R.F. (comp.)

1982-03-01T23:59:59.000Z

239

ARM - 1997 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

7 ARM Science Team Meeting 7 ARM Science Team Meeting 1997 Meeting 1997 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 1997 ARM Science Team Meeting March 3 -7 | San Antonio, Texas | St. Anthony Hotel & Municipal Auditorium The St. Anthony Hotel as well as the Municipal Auditorium and Conference Center provided rooms and meeting space. The St. Anthony Hotel as well as the Municipal Auditorium and Conference Center provided rooms and meeting space. The seventh ARM Science Team Meeting was held in San Antonio, Texas. This year the ARM Science Team Meeting and the Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP) science team meetings were held jointly. The Science Team Meetings were intended to provide opportunities

240

Online Load Balancing for Related Machines  

E-Print Network (OSTI)

of entire schedule s as follows: load(s; i) = 1 v i X s(j)=i p j ; Load(s) = max i load(s; i) It is easyOn­line Load Balancing for Related Machines Piotr Berman \\Lambda Moses Charikar y Marek Karpinski z­line load balancing was studied extensively over the years (cf., e.g., [7], [3], [4], and [2

Karpinski, Marek

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Building America Expert Meeting: Simplified Space Conditioning Strategies for Energy Efficient Houses  

Energy.gov (U.S. Department of Energy (DOE))

The Building America research team IBACOS conducted an expert meeting on March 11, 2011, at the Seaport Hotel in Boston, Massachusetts on the topic of simplified space conditioning systems in low load homes. This meeting provided a forum for presentations and discussions on the interrelationship between advanced thermal enclosures, space conditioning systems, and comfort; and an outside peer review of IBACOS’ research plan for the topic.

242

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Passive Remote Sensing of Aerosol Properties from Aircraft Measurements Passive Remote Sensing of Aerosol Properties from Aircraft Measurements Over the SGP Cairns, B. (a), Lacis, A.A. (b), Carlson, B.E. (b), Alexandrov, A. (a), and Barnard, J.C. (c), Columbia University (a), NASA Goddard Institute for Space Studies (b), Pacific Northwest National Laboratory (c) Eleventh Atmospheric Radiation Measurement (ARM) Science Team Meeting The principal difficulties in retrieving aerosol loadings and microphysical properties using passive remote sensing measurements over land surfaces are the significant spectral and spatial variations in the observed intensities that are caused by the land surface. The may also be of use in remote sensing of the surface, being indicative of its roughness, or in the case of vegetation its leaf inclination distribution. It is believed that the

243

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Aerosol Absorption, Optical Depth and Vertical Extent Estimates Using Aerosol Absorption, Optical Depth and Vertical Extent Estimates Using UV/blue Satellite Measurements Cairns, B., and Alexandrov, M.D., Columbia University; Carlson, B.E., and Lacis, A.A., NASA Goddard Institute for Space Studies Eighth Atmospheric Radiation Measurement (ARM) Science Team Meeting The radiative balance of the atmosphere and the climatological response of the atmospheric circulation to changes in aerosol loading is principally determined by the vertical extent and single-scatter albedo of the aerosols. Although UV radiance measurements made by the Total Ozone Mapping Experiment Spectrometer (TOMS) instrument have been used to detect UV absorbing aerosols and estimate their properties, the unknown verticalextent of the aerosol affects the sensitivity of the radiances to

244

Subwog 12-D tritium technology meeting  

SciTech Connect

The first Subwog 12-D Tritium Technology Meeting was held at the Westinghouse Savannah River Site during the week of May 21, 1990. Subwog 12-D was created as a subwog of JOWOG 12 to address the need to understand tritium applications throughout the entire weapons complex. This includes weapons related concerns, but is primarily intended to cover tritium production and handling, environmental, safety and health issues, compatibility with materials in general; and facility design, commissioning and decommissioning activities. Tritium technology issues discussed included the physical and chemical properties, kinetics, storage, reservoir loading techniques, isotope exchange, radiolysis/aging, process and handling technology, compatibility, purification and filtering, analysis, monitoring methods, function testing, packaging and shipping, environmental and operational safety, facility design and safety, glovebox atmosphere clean-up systems, glovebox/facility decommissioning, tritium production target materials, and tritium recovery. This document provides a collection of most of the unclassified extended abstracts and abstracts presented at Subwog 12-D.

Parker, M.J.; Addis, R.P.

1991-01-01T23:59:59.000Z

245

Subwog 12-D tritium technology meeting. Abstracts  

SciTech Connect

The first Subwog 12-D Tritium Technology Meeting was held at the Westinghouse Savannah River Site during the week of May 21, 1990. Subwog 12-D was created as a subwog of JOWOG 12 to address the need to understand tritium applications throughout the entire weapons complex. This includes weapons related concerns, but is primarily intended to cover tritium production and handling, environmental, safety and health issues, compatibility with materials in general; and facility design, commissioning and decommissioning activities. Tritium technology issues discussed included the physical and chemical properties, kinetics, storage, reservoir loading techniques, isotope exchange, radiolysis/aging, process and handling technology, compatibility, purification and filtering, analysis, monitoring methods, function testing, packaging and shipping, environmental and operational safety, facility design and safety, glovebox atmosphere clean-up systems, glovebox/facility decommissioning, tritium production target materials, and tritium recovery. This document provides a collection of most of the unclassified extended abstracts and abstracts presented at Subwog 12-D.

Parker, M.J.; Addis, R.P.

1991-12-31T23:59:59.000Z

246

239TH ACS NATIONAL MEETING  

Science Journals Connector (OSTI)

Copyright © 2010 AMERICAN CHEMICAL SOCIETY ... With “Chemistry for a Sustainable World” as the theme for this meeting, Francisco is coordinating two special events ... ...

2010-01-25T23:59:59.000Z

247

Wind Wildlife Research Meeting X  

Energy.gov (U.S. Department of Energy (DOE))

The biennial Wind Wildlife Research Meeting provides an internationally recognized forum for researchers and wind-wildlife stakeholders to hear contributed papers, view research posters, and listen...

248

Conferences & Meetings | Department of Energy  

Office of Environmental Management (EM)

Office hosts a conference each year featuring hot topics and key figures in the biomass industry. Office staff also participate in various meetings and the bienniel Peer...

249

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

EIS (TC & WM EIS), Q4 * Draft Land Conveyance Environmental Assessment, Q2 * Natural Gas Pipeline Environmental Impact Statement (EIS), Q3 * 2014 Budget meetings (2015 & 2016...

250

Recapitalizing EMSL: Meeting Future Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Recapitalizing EMSL: Meeting Future Science and Technology Challenges Environmental Molecular Sciences Laboratory 2008 DISCLAIMER This report was prepared as an account of work...

251

Spring loaded locator pin assembly  

DOE Patents (OSTI)

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece.

Groll, Todd A. (Idaho Falls, ID); White, James P. (Pocatelo, ID)

1998-01-01T23:59:59.000Z

252

Spring loaded locator pin assembly  

DOE Patents (OSTI)

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece. 5 figs.

Groll, T.A.; White, J.P.

1998-03-03T23:59:59.000Z

253

Load Forecasting of Supermarket Refrigeration  

E-Print Network (OSTI)

energy system. Observed refrigeration load and local ambient temperature from a Danish su- permarket renewable energy, is increasing, therefore a flexible energy system is needed. In the present ThesisLoad Forecasting of Supermarket Refrigeration Lisa Buth Rasmussen Kongens Lyngby 2013 M.Sc.-2013

254

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Table of Contents Table of Contents 1. By-Laws Office of Environmental Management Quality Assurance Corporate Board - June 2010 2. Corporate Board Contact List 3. Status of Action Items from Last Board Meeting 4. Update on Crosscutting Corporate Quality Assurance Issues 5. Focus Area #1 - (NQA-1 Suppliers) - Joint Supplier Evaluation Program Demonstration 6. Focus Area #2 - (Commercial Grade Items and Services Dedication Implementation) - Commercial Grade Dedication Guidance Briefing 7. Focus Area #3 - (Design Quality Assurance) - Status 8. Focus Area #4 - (Grading QA for D&D Projects) - Status 9. QA Assessments - Phase 2 QAP/QIP Assessments, Assessment Schedule for the Remainder of Calendar Year 2010, & Resource Constraints 10. Yucca Mountain Status Path Forward

255

AVESTAR® - Meet Our People  

NLE Websites -- All DOE Office Websites (Extended Search)

Meet our Trainers Graham Provost Graham Provost Trainer, AVESTAR Center Invensys Operations Management Graham is the Senior Consulting Manager for Invensys Training Services. He has over 18 years of power plant (Nuclear, Fossil, IGCC, and Combined Cycle), electrical distribution, mining and maintenance related experience, including more than 12 years of experience in training and instructional design in industrial settings. This includes 10 years in the Navy Nuclear Power Program as a supervisor, operator, and trainer, and time in the Cement and Mining Industry as an Electrical Maintenance Manager. Graham has experience in all facets of training curriculum design, development, and implementation for all types of training topics in various formats, including Simulator and Computer Based Training (CBT). As a classroom instructor, he has presented numerous courses for operations, maintenance, and supervision, totaling thousands of hours of classroom presentation time.

256

SPE Western Regional Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydrates Advisory Hydrates Advisory Committee Meeting Program Funding Louis Capitanio Methane Hydrate Program Manager Office of Oil and Natural Gas June 7, 2013 FY 2012 & FY 2013 Budgets FY 2012 Appropriation - $9.7 million * FOA to re-engage the research community in the development of alternative field and supporting laboratory/modeling research opportunities; and to continue ongoing work primarily at the National Lab's, interagency, and in-house. FY 2013 Appropriation - $4.8 million * Operating under full year Continuing Resolution for ongoing methane hydrate research on cost-effective and responsible extraction of methane hydrates. * While we would like to build on the success of the ConocoPhillips test with a long-

257

IEP - Water-Energy Interface: Total Maximum Daily Load Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Total Maximum Daily Loads (TMDLs) Total Maximum Daily Loads (TMDLs) The overall goal of the Clean Water Act is to "restore and maintain the chemical, physical, and biological integrity of the Nation’s waters." In 1999, EPA proposed changes to Section 303(d), to establish Total Maximum Daily Loads (TMDLs) for watersheds that do not meet this goal. The TMDL is the highest amount of a given pollutant that is permissible in that body of water over a given period of time. TMDLs include both waste load allocation (WLA) for point sources and load allocations for non-point sources. In Appalachia, acid mine drainage (AMD) is the single most damaging non-point source. There is also particular concern of the atmospheric deposition of airborne sulfur, nitrogen, and mercury compounds. States are currently in the process of developing comprehensive lists of impaired waters and establishing TMDLs for those waters. EPA has recently proposed a final rule that will require states to develop TMDLs and implement plans for improving water quality within the next 10 years. Under the new rule, TMDL credits could be traded within a watershed.

258

building load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

259

Fracture toughness and fatigue crack growth characteristics of nanotwinned copper  

E-Print Network (OSTI)

fracture and subcritical fatigue crack growth life. Possible mechanistic origins of these trends and the resistance to stable subcritical crack growth under mono- tonic and cyclic loading, especially at lowerFracture toughness and fatigue crack growth characteristics of nanotwinned copper A. Singh a,1 , L

Suresh, Subra

260

QER Public Meeting in Providence, RI & Hartford, CT: New England Regional Infrastructure Constraints  

Energy.gov (U.S. Department of Energy (DOE))

Meeting Files: Meeting Agenda, Meeting Briefing Memo, Federal Register Notice, Meeting Summary, Transcript of Meeting, and Panelist Remarks

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Building America Meetings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meetings Meetings Building America Meetings Photo of people watching a presentation on a screen the foreground shows a person's hands taking notes on a notepad. The Department of Energy's (DOE) Building America program hosts open meetings and webinars for industry partners and stakeholders that provide a forum to exchange information about various aspects of residential building research. Upcoming Meetings Past Technical and Stakeholder Meetings Webinars Expert Meetings Upcoming Meetings There are no Building America meetings scheduled at this time. Please subscribe to Building America news and updates to receive notification of future meetings. Past Technical and Stakeholder Meetings Building America 2013 Technical Update Meeting: April 2013 Building America 2012 Technical Update Meeting: July 2012

262

245th ACS National Meeting  

Science Journals Connector (OSTI)

Copyright © 2013 Chemical & Engineering News ... Symposia supporting the meeting’s theme, “Chemistry of Energy & Food,” are organized by thematic program chair James N. Seiber, professor emeritus at the University of California, Davis, and editor of the Journal of Agricultural & Food Chemistry. ...

EMILY BONES

2013-01-28T23:59:59.000Z

263

2006 Fall Meeting Search Results  

E-Print Network (OSTI)

2006 Fall Meeting Search Results Cite abstracts as Author(s) (2006), Title, Eos Trans. AGU, 87 browsers. The iCronus project intends to create a publicly accessible website that contains published and weathering DE: 5475 Tectonics (8149) SC: Tectonophysics [T] MN: 2006 Fall Meeting #12;

Zreda, Marek

264

EMSL User Executive Committe Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

User Executive User Executive Committee Meeting July 13, 2011 Recommendations Valerie Copie, UEC Chair User Meetings/Workshops EUC Comments & Recommendations: The UEC supports EMSL's focus on specific areas for User meetings and workshops rather than organizing a generalized User Meeting Focused meetings may provide opportunities for users to visit EMSL more often and to participate in team building as envisaged by the new vision of EMSL2.0 The UEC would like EMSL to have broad representations at these workshops to avoid having too many internal participants. The Pore-scale workshop may be a good model to follow for focused workshops While the UEC supports focused workshops, the entire user community should be welcome to attend them and informed about these activities

265

load data | OpenEI Community  

Open Energy Info (EERE)

51 51 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234851 Varnish cache server load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data

266

RJMCMC POINT PROCESS SAMPLER FOR SINGLE SENSOR SOURCE SEPARATION: AN APPLICATION TO ELECTRIC LOAD MONITORING  

E-Print Network (OSTI)

case of space-heating, which is the most consuming electric end-use in France1 . This is a source of the electric systems will undoubtedly be helpful to meet these challenges. Actually, a good knowledgeRJMCMC POINT PROCESS SAMPLER FOR SINGLE SENSOR SOURCE SEPARATION: AN APPLICATION TO ELECTRIC LOAD

Boyer, Edmond

267

Mechanical Engineering Faculty Candidate Seminar: Mechanical Loading Decreases Osteolysis and Tumor  

E-Print Network (OSTI)

Mechanical Engineering Faculty Candidate Seminar: Mechanical Loading Decreases Osteolysis and Tumor.D. Cornell University Mechanical Engineering Abstract: Approximately 1 in 4 patients with advanced breast to meet structural and metabolic needs via a feedback loop that is regulated by the prevailing mechanical

Wisconsin at Madison, University of

268

Secretary Bodman Meets with Regional Energy Ministers in Hungary |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Energy Ministers in Hungary Regional Energy Ministers in Hungary Secretary Bodman Meets with Regional Energy Ministers in Hungary March 17, 2006 - 3:44pm Addthis Emphasizes U.S. Support for Central European Energy Security BUDAPEST, HUNGARY - Secretary of Energy Samuel W. Bodman today participated in a regional energy meeting with ministers from Hungary, Czech Republic, Poland, Slovakia, Austria, Croatia and Romania. During the meeting, Secretary Bodman and the ministers discussed the importance of advancing sufficient, affordable, clean and reliable energy supplies to sustain global economic growth, accommodate heightened demand, and promote regional energy security. Traveling to Budapest from Moscow where he participated in the G8 Energy Ministerial, Secretary Bodman reaffirmed the G8 priorities

269

Electricity Advisory Committee Meeting, October 19-20, 2011- Meeting Minutes and Transcripts  

Energy.gov (U.S. Department of Energy (DOE))

Meeting minutes and transcripts for the October 19-20, 2011 meeting of the Electricity Advisory Committee.

270

Electricity Advisory Committee Meeting, September 24-25, 2014- Meeting Summaries and Transcripts  

Energy.gov (U.S. Department of Energy (DOE))

Meeting summaries and transcripts for the September 24-25, 2014 meeting of the Electricity Advisory Committee.

271

Electricity Advisory Committee Meeting, March 12-13, 2014- Meeting Minutes and Transcripts  

Energy.gov (U.S. Department of Energy (DOE))

Meeting minutes and transcripts for the March 12-13, 2014 meeting of the Electricity Advisory Committee.

272

Electricity Advisory Committee Meeting, March 5-6, 2012- Meeting Minutes and Transcripts  

Energy.gov (U.S. Department of Energy (DOE))

Meeting minutes and transcripts for the March 5-6, 2012 meeting of the Electricity Advisory Committee.

273

Electricity Advisory Committee Meeting, June 11-12, 2012- Meeting Minutes and Transcripts  

Energy.gov (U.S. Department of Energy (DOE))

Meeting minutes and transcripts for the June 11-12, 2012 meeting of the Electricity Advisory Committee.

274

Electricity Advisory Committee Meeting, June 16-17, 2014- Meeting Summaries and Transcripts  

Energy.gov (U.S. Department of Energy (DOE))

Meeting summaries and transcripts for the June 16-17, 2014 meeting of the Electricity Advisory Committee.

275

Nanosegregated Cathode Catalysts with Ultra-Low Platinum Loading  

NLE Websites -- All DOE Office Websites (Extended Search)

2009 DOE EERE Kick-off Meeting 2009 DOE EERE Kick-off Meeting Announcement No: DE-PS36-08GO98010 Topic: 1A Nanosegregated Cathode Catalysts with Ultra-Low Platinum Loading Argonne National Laboratory Materials Science Division PI: Nenad M. Markovic Co-PI: Vojislav R. Stamenkovic Subcontractors: * Oak Ridge National Laboratory - Karren More * Jet Propulsion Laboratory - NASA - S.R. Narayan * Brown University - Shouheng Sun * Indiana University Purdue - Goufeng Wang * 3M Company - Radoslav Atanasoski Overview Timeline * Project start: 9/2009 * Project end: 9/2012 Barriers ~ 30-40% (!!!) Cathode kinetics * The main losses: CATHODE 1) High content of Pt 2) Poor activity: Pt/C = Pt-poly/10 3) Durability (Pt dissolves: power loss) 4) Carbon support corrosion Budget * Total Project funding $ 6.5M

276

Electrical and Production Load Factors  

E-Print Network (OSTI)

, Texas Abstract Load factors and operating hours of small and medium-sized industrial plants are analyzed to classify shift-work patterns and develop energy conservation diagnostic tools. This paper discusses two types of electric load factors... for each shift classification within major industry groups. The load factor based on billing hours (ELF) increases with operating hours from about 0.4 for a nominal one shift operation, to about 0.7 for around-the-clock operation. On the other hand...

Sen, T.; Heffington, W. M.

277

Oak Ridge Site Specific Advisory Board Meetings | Department...  

Office of Environmental Management (EM)

Meetings Oak Ridge Site Specific Advisory Board Meetings Board Meeting Documents Available for Download January 15, 2015 ORSSAB Meeting - November 2014 Discussion of board...

278

TEC Working Group Topic Groups Security Meeting Summaries | Department...  

Office of Environmental Management (EM)

Summaries TEC Working Group Topic Groups Security Meeting Summaries Meeting Summaries Green Bay STG Meeting Summary- September 14, 2006 Washington STG Meeting Summary - March 14,...

279

March 6 & 7, 2013 Meeting of the Electricity Advisory Committee...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advisory Committee Archived Meetings 2008-2013 EAC 2013 Meetings March 6 & 7, 2013 Meeting of the Electricity Advisory Committee March 6 & 7, 2013 Meeting of the...

280

Electricity Advisory Committee Meeting, October 15-16, 2012 ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 15-16, 2012 - Meeting Summaries and Transcripts Electricity Advisory Committee Meeting, October 15-16, 2012 - Meeting Summaries and Transcripts Meeting summaries and...

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Electricity Advisory Committee Meeting, October 19-20, 2011 ...  

Energy Savers (EERE)

Electricity Advisory Committee Meeting, October 19-20, 2011 - Meeting Minutes and Transcripts Electricity Advisory Committee Meeting, October 19-20, 2011 - Meeting Minutes and...

282

Building Technologies Office: Building America Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Meetings Meetings Photo of people watching a presentation on a screen; the foreground shows a person's hands taking notes on a notepad. The Department of Energy's (DOE) Building America program hosts open meetings and webinars for industry partners and stakeholders that provide a forum to exchange information about various aspects of residential building research. Upcoming Meetings Past Technical and Stakeholder Meetings Webinars Expert Meetings Upcoming Meetings There are no Building America meetings scheduled at this time. Please subscribe to Building America news and updates to receive notification of future meetings. Past Technical and Stakeholder Meetings Building America 2013 Technical Update Meeting: April 2013 This meeting showcased world-class building science research for high performance homes in a dynamic new format. Researchers from Building America teams and national laboratories presented on key issues that must be resolved to deliver homes that reduce whole house energy use by 30%-50%. View the presentations.

283

ARM - 2006 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Meeting 2006 Meeting 2006 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Posters Presentations Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 2006 ARM Science Team Meeting March 27-18 | Albuquerque, New Mexico | Hyatt Regency Albuquerque The Hyatt Regency - Albequerque The Hyatt Regency - Albequerque Meeting Highlights Just over 300 ARM scientists and ACRF infrastructure staff took part in the 16th ARM Science Team meeting held in Albuquerque, New Mexico, on March 27-31, 2006. After an initial day of focused meetings among the ARM Working Groups, Dr. David Thomassen, Acting Associate Director of DOE's Office of Biological and Environmental Research (BER), opened the meeting's plenary session with remarks about the role of ARM within the DOE, and its

284

ARM - 1996 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

6 ARM Science Team Meeting 6 ARM Science Team Meeting 1996 Meeting 1996 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 1996 ARM Science Team Meeting March 4 - 7 | San Antonio, Texas | Municipal Auditorium The St. Anthony Hotel, as well as the Municipal Auditorium and Conference Center, provided rooms and meeting space. The St. Anthony Hotel, as well as the Municipal Auditorium and Conference Center, provided rooms and meeting space. The fifth ARM Science Team Meeting was held in San Antonio, Texas, at the Municipal Auditorium and Conference Center. The Science Team Meetings were intended to provide opportunities to share scientific findings, focused technical exchanges, and collectively examine the implementation and

285

Electricity Advisory Committee (EAC) - 2012 Meetings | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Meetings Electricity Advisory Committee (EAC) - 2012 Meetings MARCH 5 & 6, 2012 MEETING OF THE ELECTRICITY ADVISORY COMMITTEE Date: Monday, March 5, 2012 2:00 p.m. - 5:00 p.m....

286

Electricity Advisory Committee (EAC) - 2011 Meetings | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Meetings Electricity Advisory Committee (EAC) - 2011 Meetings OCTOBER 19 & 20, 2011 MEETING OF THE ELECTRICITY ADVISORY COMMITTEE Date: Wednesday, October 19, 2011 2:00 p.m. -...

287

Electricity Advisory Committee (EAC) - 2010 Meeting | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Meeting Electricity Advisory Committee (EAC) - 2010 Meeting OCTOBER 29, 2010 MEETING OF THE ELECTRICITY ADVISORY COMMITTEE Date: Friday, October 29, 2010 8:00 a.m. - 3:00 p.m....

288

Electricity Advisory Committee (EAC) - 2008 Meetings | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 Meetings Electricity Advisory Committee (EAC) - 2008 Meetings DECEMBER 11, 2008 MEETING OF THE ELECTRICITY ADVISORY COMMITTEE Date: Thursday, December 11, 2008, 9:00 a.m. - 4:00...

289

ARM - 2000 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

0 ARM Science Team Meeting 0 ARM Science Team Meeting 2000 Meeting 2000 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 2000 ARM Science Team Meeting March 13 - 17 | San Antonio, Texas | St. Anthony Hotel & The Municipal Auditorium St. Anthony Hotel provided rooms along with the Municipal Auditorium for the 2000 ARM Science Team Meeting. St. Anthony Hotel provided rooms along with the Municipal Auditorium for the 2000 ARM Science Team Meeting. The tenth ARM Science Team Meeting was held in San Antonio, Texas. The Science Team Meetings were intended to provide opportunities to share scientific findings, focused technical exchanges, and collectively examine the implementation and operation of ARM.

290

Meeting and Presentation Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A A 2. A 3. Su 4. Su 5. N 6. Fo 7. Fo 8. Fo 9. Fo 10. Tr 11. D 12. EM 13. In 14. St 15. Fo 16. M 17. R 18. FY 19. EM 20. St 21. M 22. M 23. M 24. Su 25. S- 26. EM U 27. Su Q 28. P Q 29. O A 30. 20 genda nnouncemen ummary of EM ummary of EM QA-1 Accred ocus Area #1 ocus Area #2 ocus Area #3 ocus Area #4 raining Acade iscussion on M Corporate nternational S tandard QA C ocus Area #4 Meeting Minu oadmap - EM Y 2011 Annua M QA Corpor tandard Revie Memo Allowin Memo Allowin Memo Providi upplemental -1 Memo on I M Interim Po sed Nuclear F upport to the Quality Assura rotocol for EM Quality Assura Office of Envir ssurance Pro 010 Project P nts/Introducti M Corporate M Quality Ass itation Discus - (NQA-1 Sup - (Commerci - (Design Qu - (Grading Q

291

Final Meeting Summary Page 1 Tank Waste Committee Meeting August...  

NLE Websites -- All DOE Office Websites (Extended Search)

that there will be a Committee of the Whole (COTW) meeting the following day in order to review the Site-Wide Permit draft advice. She encouraged all Hanford Advisory Board (Board...

292

Building Technologies Office: Building America Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Building America Building America Meetings to someone by E-mail Share Building Technologies Office: Building America Meetings on Facebook Tweet about Building Technologies Office: Building America Meetings on Twitter Bookmark Building Technologies Office: Building America Meetings on Google Bookmark Building Technologies Office: Building America Meetings on Delicious Rank Building Technologies Office: Building America Meetings on Digg Find More places to share Building Technologies Office: Building America Meetings on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance Solution Center Partnerships Meetings Publications Home Energy Score Home Performance with ENERGY STAR

293

Building America Expert Meeting Report: Foundations Research...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Update Meeting Summary Report: Denver, Colorado - August 9-11, 2011 Residential Energy Efficiency Technical Update Meeting: August 2011 Exterior Rigid Insulation Best...

294

Residential Energy Efficiency Technical Update Meeting: August...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Residential Energy Efficiency Technical Update Meeting: August 2011 Residential Energy Efficiency Technical Update Meeting: August 2011 On this page, you may link to the summary...

295

Utility Energy Service Contract Partnership Meetings | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

meetings and utility energy service contract (UESC) training. FEMP experts will train partnership meeting attendees on UESC partnership requirements and processes,...

296

Residential Energy Efficiency Research Planning Meeting Summary...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Summary Report Residential Energy Efficiency Research Planning Meeting Summary Report This report summarizes key findings and outcomes from the U.S. Department of Energy's...

297

ARM - 1993 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Past Science Team Meetings 1993 ARM Science Team Meeting March 1 - 4 | Norman, Oklahoma | Norman, Oklahoma, is the home of the National Weather Service. Norman, Oklahoma, is...

298

ARM - 2007 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Award-Winning Posters Presentations Cover Competition Winners Meeting Archives ARM Science Team Meeting...

299

ARM - 2007 Science Team Meeting Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Award-Winning Posters Presentations Cover Competition Winners Meeting Archives ARM Science Team Meeting...

300

ARM - 2008 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Award-Winning Posters Presentations Cover Competition Winners Meeting Archives ARM Science Team Meeting...

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ARM - 2009 Science Team Meeting Pictures  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Award-Winning Posters Presentations Cover Competition Winners Meeting Archives ARM Science Team Meeting...

302

July 18, 2014 Commission Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE))

This meeting was the inaugural meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). The Commission members heard opening remarks by Secretary...

303

Building America Residential Buildings Energy Efficiency Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Residential Buildings Energy Efficiency Meeting: July 2010 Building America Residential Buildings Energy Efficiency Meeting: July 2010 On this page, you may link to the summary...

304

Conference Calls / Live Meetings - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Conference Calls Live Meetings About Us Hanford Overview and History Hanford Cleanup Hanford Site Wide Programs Conference Calls Live Meetings Email Email Page | Print Print...

305

Electricity Advisory Committee Meeting Presentations June 2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Advisory Committee Meeting Presentations June 2012 - Tuesday, June 12, 2012 Electricity Advisory Committee Meeting Presentations June 2012 - Tuesday, June 12, 2012 The...

306

2011 Peer Review Meeting | Department of Energy  

Energy Savers (EERE)

1 Peer Review Meeting 2011 Peer Review Meeting In June 2011, the U.S. Department of Energy Geothermal Technologies Office (GTO) (formerly Geothermal Technologies Program) held...

307

ORSSAB Meeting - October 2014 | Department of Energy  

Office of Environmental Management (EM)

October 2014 ORSSAB Meeting - October 2014 Oak Ridge Site Specific Advisory Board meeting minutes and materials. Oak Ridge National Lab Update - Bill McMillan, DOE October ORSSAB...

308

FY 93 thermal loading systems study final report: Volume 1. Revision 1  

SciTech Connect

The ability to meet the overall performance requirements for the proposed Mined Geology Disposal System at Yucca Mountain, Nevada requires the two major subsystem (natural barriers and engineered barriers) to positively contribute to containment and radionuclide isolation. In addition to the postclosure performance the proposed repository must meet preclosure requirements of safety, retrievability, and operability. Cost and schedule were also considered. The thermal loading strategy chosen may significantly affect both the postclosure and preclosure performance of the proposed repository. Although the current Site Characterization Plan reference case is 57 kilowatts (kW)/acre, other thermal loading strategies (different areal mass loadings) have been proposed which possess both advantages and disadvantages. The objectives of the FY 1993 Thermal Loading Study were to (1) place bounds on the thermal loading which would establish the loading regime that is ``too hot`` and the loading regime that is ``too cold``, to (2) ``grade`` or evaluate the performance, as a function of thermal loading, of the repository to contain high level wastes against performance criteria and to (3) evaluate the performance of the various options with respect to cost, safety, and operability. Additionally, the effort was to (4) identify important uncertainties that need to be resolved by tests and/or analyses in order to complete a performance assessment on the effects of thermal loading. The FY 1993 Thermal Loading Study was conducted from December 1, 1992 to December 30, 1993 and this final report provides the findings of the study. Volume 1 contains the Introduction; Performance requirements; Input and assumptions; Near-field thermal analysis; Far-field thermal analysis; Cost analysis; Other considerations; System analysis; Additional thermal analysis; and Conclusions and recommendations. 71 refs., 54 figs.

Saterlie, S.F.; Thomson, B.H.

1994-08-29T23:59:59.000Z

309

Analysis and Representation of Miscellaneous Electric Loads in NEMS -  

Gasoline and Diesel Fuel Update (EIA)

Analysis and Representation of Miscellaneous Electric Loads in NEMS Analysis and Representation of Miscellaneous Electric Loads in NEMS Release date: January 6, 2014 Miscellaneous Electric Loads (MELs) comprise a growing portion of delivered energy consumption in residential and commercial buildings. Recently, the growth of MELs has offset some of the efficiency gains made through technology improvements and standards in major end uses such as space conditioning, lighting, and water heating. Miscellaneous end uses, including televisions, personal computers, security systems, data center servers, and many other devices, have continued to penetrate into building-related market segments. Part of this proliferation of devices and equipment can be attributed to increased service demand for entertainment, computing, and convenience appliances.

310

VLHC Meeting | Superconducting Magnet Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Second Annual Very Large Hadron Collider (VLHC) Meeting Second Annual Very Large Hadron Collider (VLHC) Meeting October 16 - 18, 2000 The Second Annual Meeting of the Very Large Hadron Collider (VLHC) was be held on Monday, October 16 through Wednesday, October 18, 2000. It took place at Danfords in Port Jefferson, NY, about 30 minutes from Brookhaven National Laboratory. The meeting featured reports of the U.S. effort towards a post-LHC hadron collider. The program included an overview of physics in the 100 TeV c.m. regime, reports on superconductor and magnet R&D, as well as studies of accelerators and accelerator systems. The agenda also included a roundtable discussion of plans for future activities. Presentations VLHC Update (pdf), Mike Harrison, BNL Physics at Very High Energies (pdf), Sekhar Chivukula, Boston

311

SA TEC Meeting Notes -- Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 6-7, 2008 February 6-7, 2008 San Antonio, Texas U.S DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP MEETING February 6-7, 2008 San Antonio, Texas Welcome and Meeting Overview The U.S. Department of Energy (DOE), Transportation External Coordination (TEC) Working Group held its 29th meeting on February 6-7, 2008, in San Antonio, Texas. One hundred thirty- one participants from government, industry, professional organizations, and other interested parties met to address a variety of issues related to radioactive materials transportation. The TEC process involves these key stakeholders in developing solutions to DOE transportation issues. These meetings provide continuing and improved coordination between DOE, other levels of government, and outside organizations with DOE transportation-related responsibilities.

312

Massachusetts Wind Working Group Meeting  

Office of Energy Efficiency and Renewable Energy (EERE)

The meeting will feature a panel presentation and discussion on Shadow-Flicker, as well as updates related to the Community Wind Outreach Initiative.   Panel speakers so far include: Elizabeth King...

313

American Association Meeting at Boston  

Science Journals Connector (OSTI)

... meeting of the American Association for the Advancement of Science was held at Boston on December 26–30. Several of the addresses delivered by presidents of sections have appeared in recent ...

1923-04-07T23:59:59.000Z

314

REEE Solicitation Public Meeting Presentation  

Energy.gov (U.S. Department of Energy (DOE))

A copy of a REEE Solicitation Public Meeting Presentation. The presentation provides an overview of the Loan Programs Office mission, support, projects, and reviews the Draft Renewable Energy and Energy Efficient Projects Solicitation.

315

SUMMARY REPORT ANNUAL IABP MEETING  

E-Print Network (OSTI)

SUMMARY REPORT THE 7TH ANNUAL IABP MEETING St. Petersburg, Russia, 3 - 6 June 1997 #12;IABP-7 Summary Report 2 Table of Contents Summary Report-ordinator's Report.......................................................... 20 5. Report of the Data Buoy Co

Rigor, Ignatius G.

316

New Fuel Cell Projects Meeting  

Energy.gov (U.S. Department of Energy (DOE))

On February 13-14, 2007, the U.S. Department of Energy (DOE) held a kick-off meeting for fuel cell projects awarded under a hydrogen R&D solicitation. Principal investigators presented project...

317

Denver: 128th Annual Meeting  

Science Journals Connector (OSTI)

...director, Laboratory for Insulation Re-search, Massachusetts...parts-customized to meet your own specifications. In addition, Keystone...been unavailable. Detailed specification sheets explain the operation...space power generation and thermal control system. Powered...

1961-12-08T23:59:59.000Z

318

Final Meeting Summary Page 1  

NLE Websites -- All DOE Office Websites (Extended Search)

that all summaries are posted to the HAB website once finalized and HAB members can review draft summaries on the SharePoint site. Announcements Liz said a public meeting was...

319

EIS-0458: Scoping Meeting Transcript  

Energy.gov (U.S. Department of Energy (DOE))

Transcript of the public scoping meeting on the draft EIS for the proposed loan guarantee for the First Solar Topaz Solar Farm Project in San Luis Obispo County, CA.

320

Liquefaction contractors` review meeting. Proceedings  

SciTech Connect

Papers presented at the Liquefaction Contractor`s Review Meeting are grouped in the proceedings under indirect liquefaction, AR and TD, and direct liquefaction. Individual papers have been processed separately for inclusion in the Energy Science and Technology base. (AT)

Stiegel, G.J. [USDOE Pittsburgh Energy Technology Center, PA (United States); Srivastava, R.D. [Burns and Roe Services Corp., Pittsburgh, PA (United States)] [eds.

1991-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NOTICE OF RENEWABLE POWER STANDARDS (RPS) MEETING Renewable Portfolio Standard Plan Before Council  

E-Print Network (OSTI)

NOTICE OF RENEWABLE POWER STANDARDS (RPS) MEETING Renewable Portfolio Standard Plan Before Council Background On April 12, 2011, Governor Brown signed into law Senate Bill X1 2, establishing a Renewables establishes minimum quantities of renewable energy resources that load serving entities must procure annually

322

electric load data | OpenEI Community  

Open Energy Info (EERE)

load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load building...

323

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

Bulk System Load  Model in GE PSLF TM for Investigating the a Bulk System Load Model in GE PSLF TM for Investigating thecomposite load model in  the PSLF simulation software; the 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

324

Determining Electric Motor Load and Efficiency  

Energy.gov (U.S. Department of Energy (DOE))

To compare the operating costs of an existing standard motor with an appropriately-sized energy-efficient replacement, you need to determine operating hours, efficiency improvement values, and load. Part-load is a term used to describe the actual load served by the motor as compared to the rated full-load capability of the motor. Motor part-loads may be estimated through using input power, amperage, or speed measurements. This fact sheet briefly discusses several load estimation techniques.

325

Tank Waste Corporate Board Meeting 11/06/08 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11/06/08 11/06/08 Tank Waste Corporate Board Meeting 11/06/08 The following documents are associated with the Tank Waste Corporate Board Meeting held on November 6th, 2008. Note: (Please contact Steven Ross at steven.ross@em.doe.gov for a HLW Glass Waste Loadings version with animations on slide 6). Slurry Retrieval, Pipeline Transport & Plugging and Mixing Workshop The Way Ahead - West Valley Demonstration Project High-Level Liquid Waste Tank Integrity Workshop - 2008 Savannah River Tank Waste Residuals Hanford Tank Waste Residuals HLW Glass Waste Loadings High-Level Waste Corporate Board Performance Assessment Subcommittee More Documents & Publications Tank Waste Corporate Board Meeting 11/18/10 System Planning for Low-Activity Waste at Hanford Waste Treatment and Immobilation Plant HLW Waste Vitrification Facility

326

Influence of loading rate on axially loaded piles in clay  

E-Print Network (OSTI)

, Haas and Saxe Yong and Japp. Arulanandan and Shen 4 ~ ~ ~ ~ ~ ~ 4 5 5 6 6 13 13 21 21 22 22 23 23 24 24 Ladd, Hi11iams, Connell and Edgars Berre and Bjerrum. Stevenson. King Vaid and Campanella. Lacasse. Rigqins. CHAPTER V... of the Gain in Strength versus Shearing Rate Plots 4. Select Regression, PI, LI, W, SO(REF) 76 Cases for 152 Laboratory Tests 5. Collected Data for Pile Load Test Results. 6. Data Set References for Pile Load Tests. Page 14 36 54 61 7. Semi...

Garland Ponce, Enrique Eduardo

2012-06-07T23:59:59.000Z

327

Cooling load design tool for UFAD systems.  

E-Print Network (OSTI)

Underfloor Air Distribution (UFAD) Design Guide. Atlanta:Load Design Tool for Underfloor Air Distribution Systems. ”for design cooling loads in underfloor air distribution (

Bauman, Fred; Schiavon, Stefano; Webster, Tom; Lee, Kwang Ho

2010-01-01T23:59:59.000Z

328

Self-aligning biaxial load frame  

DOE Patents (OSTI)

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed crosshead, and by alignment and linear motion elements of one load assembly relative to the load frame.

Ward, Michael B. (Idaho Falls, ID); Epstein, Jonathan S. (Idaho Falls, ID); Lloyd, W. Randolph (Idaho Falls, ID)

1994-01-01T23:59:59.000Z

329

Self-aligning biaxial load frame  

DOE Patents (OSTI)

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

1994-01-18T23:59:59.000Z

330

Peak load management: Potential options  

SciTech Connect

This report reviews options that may be alternatives to transmission construction (ATT) applicable both generally and at specific locations in the service area of the Bonneville Power Administration (BPA). Some of these options have potential as specific alternatives to the Shelton-Fairmount 230-kV Reinforcement Project, which is the focus of this study. A listing of 31 peak load management (PLM) options is included. Estimated costs and normalized hourly load shapes, corresponding to the respective base load and controlled load cases, are considered for 15 of the above options. A summary page is presented for each of these options, grouped with respect to its applicability in the residential, commercial, industrial, and agricultural sectors. The report contains comments on PLM measures for which load shape management characteristics are not yet available. These comments address the potential relevance of the options and the possible difficulty that may be encountered in characterizing their value should be of interest in this investigation. The report also identifies options that could improve the efficiency of the three customer utility distribution systems supplied by the Shelton-Fairmount Reinforcement Project. Potential cogeneration options in the Olympic Peninsula are also discussed. These discussions focus on the options that appear to be most promising on the Olympic Peninsula. Finally, a short list of options is recommended for investigation in the next phase of this study. 9 refs., 24 tabs.

Englin, J.E.; De Steese, J.G.; Schultz, R.W.; Kellogg, M.A.

1989-10-01T23:59:59.000Z

331

Plymouth Meeting, Pennsylvania: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Meeting, Pennsylvania: Energy Resources Meeting, Pennsylvania: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.1023319°, -75.2743467° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.1023319,"lon":-75.2743467,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

332

EFFECT OF VISCOUS GRAIN BRIDGING ON CYCLIC FATIGUE-CRACK GROWTH IN MONOLITHIC CERAMICS  

E-Print Network (OSTI)

, toughness, creep, and subcritical crack growth [1± 10]. Under quasi-static loading, subcritical crack growthEFFECT OF VISCOUS GRAIN BRIDGING ON CYCLIC FATIGUE-CRACK GROWTH IN MONOLITHIC CERAMICS AT ELEVATED allow for consistent crack-growth monitoring in these materials at high temperatures, and even

Ritchie, Robert

333

President Obama Visits North Carolina's Cree, Inc., and Meets with Council  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Carolina's Cree, Inc., and Meets with North Carolina's Cree, Inc., and Meets with Council on Jobs and Competitiveness President Obama Visits North Carolina's Cree, Inc., and Meets with Council on Jobs and Competitiveness June 13, 2011 - 12:06pm Addthis Jen Psaki White House Deputy Communications Director Editor's Note: This entry has been cross-posted from the White House Blog. Today, President Obama will travel to Durham, NC to meet with the Jobs and Competitiveness Council at the corporate and U.S. manufacturing headquarters of Cree, a leading manufacturer of energy efficient LED lighting. The President will tour Cree's manufacturing facilities, deliver remarks and meet with the Jobs Council to discuss initiatives and policies to spur economic growth, promote job creation and accelerate hiring across the nation.

334

QA Corporate Board Meeting- October 2014  

Energy.gov (U.S. Department of Energy (DOE))

Board minutes, agenda, and presentations from meeting held on October 27, 2014 in Las Vegas, Nevada.

335

Technical Meeting: Buildings-to-Grid Integration  

Energy.gov (U.S. Department of Energy (DOE))

Background material from the December 2012, Buildings to Grid Integration Technical Meeting in Golden, CO.

336

Utilization of Heat Pump Water Heaters for Load Management  

SciTech Connect

The Energy Conservation Standards for Residential Water Heaters require residential electric storage water heaters with volumes larger than 55 gallons to have an energy factor greater than 2.0 after April 2015. While this standard will significantly increase the energy efficiency of water heaters, large electric storage water heaters that do not use heat pump technologies may no longer be available. Since utilities utilize conventional large-volume electric storage water heaters for thermal storage in demand response programs, there is a concern that the amended standard will significantly limit demand response capacity. To this end, Oak Ridge National Laboratory partnered with the Tennessee Valley Authority to investigate the load management capability of heat pump water heaters that meet or exceed the forthcoming water heater standard. Energy consumption reduction during peak periods was successfully demonstrated, while still meeting other performance criteria. However, to minimize energy consumption, it is important to design load management strategies that consider the home s hourly hot water demand so that the homeowner has sufficient hot water.

Boudreaux, Philip R [ORNL; Jackson, Roderick K [ORNL; Munk, Jeffrey D [ORNL; Gehl, Anthony C [ORNL; Lyne, Christopher T [ORNL

2014-01-01T23:59:59.000Z

337

Clean Cities: National and Regional Coordinator Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

National and Regional Coordinator National and Regional Coordinator Meetings to someone by E-mail Share Clean Cities: National and Regional Coordinator Meetings on Facebook Tweet about Clean Cities: National and Regional Coordinator Meetings on Twitter Bookmark Clean Cities: National and Regional Coordinator Meetings on Google Bookmark Clean Cities: National and Regional Coordinator Meetings on Delicious Rank Clean Cities: National and Regional Coordinator Meetings on Digg Find More places to share Clean Cities: National and Regional Coordinator Meetings on AddThis.com... Coordinator Basics Outreach Education & Webinars Meetings Reporting Contacts National and Regional Coordinator Meetings Clean Cities hosts national and regional meetings for coordinators to share expertise, success stories, and lessons learned and to hear what's

338

Solid-State Lighting: Conferences and Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Conferences and Meetings to Conferences and Meetings to someone by E-mail Share Solid-State Lighting: Conferences and Meetings on Facebook Tweet about Solid-State Lighting: Conferences and Meetings on Twitter Bookmark Solid-State Lighting: Conferences and Meetings on Google Bookmark Solid-State Lighting: Conferences and Meetings on Delicious Rank Solid-State Lighting: Conferences and Meetings on Digg Find More places to share Solid-State Lighting: Conferences and Meetings on AddThis.com... Conferences & Meetings Past Conferences Presentations Publications Webcasts Videos Tools Conferences and Meetings DOE organizes three annual workshops to bring together a diverse gathering of participants-government, industry, academia, research institutions, energy efficiency organizations, utilities, retailers, and designers-to

339

1994 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 1.  

SciTech Connect

The 1994 Pacific Northwest Loads and Resources Study establishes the Bonneville Power Administration`s (BPA) planning basis for supplying electricity t6 BPA customers. The Loads and Resources Study is presented in two documents: (1) this technical appendix detailing loads and resources for each major Pacific Northwest generating utility; and (2) a summary of Federal system and Pacific Northwest region loads and resources. This analysis updates the 1993 Pacific Northwest Loads and Resources Study Technical Appendix published in December 1993. This technical appendix provides utility specific information that BPA uses in its long-range planning. It incorporates the following for each utility: (1) electrical demand-firm loads; (2) generating resources; and (3) contracts both inside and outside the region. This document should be used in combination with the 1994 Pacific Northwest Loads and Resources Study, published in December 1994, because much of the information in that document is not duplicated here. This BPA planning document incorporates Pacific Northwest generating resources and the 1994 medium load forecast prepared by BPA. Each utility`s forecasted future firm loads are subtracted from its existing resources to determine whether it will be surplus or deficit. If a utility`s resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which the utility can sell to increase revenues. Conversely, if its firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet the utility`s load.

United States. Bonneville Power Administration.

1994-12-01T23:59:59.000Z

340

Public Scoping Meeting Public Scoping Meeting David Levenstein  

Office of Legacy Management (LM)

Public Scoping Public Scoping Meeting Public Scoping Meeting David Levenstein EIS Document Manager David Levenstein EIS Document Manager 2 About Tonight's Scoping Meeting * Scoping is a required step in the National Environmental Policy Act (NEPA) process for preparing an environmental impact statement (EIS). * Scoping is the process of determining the subjects that will be considered and evaluated in an EIS. * Public comments - both oral and written - received during the scoping period are taken into account when decisions are made about the issues and alternatives to be analyzed in an EIS. * The scoping period for the Mercury Storage EIS began with publication in the Federal Register of DOE's Notice of Intent to prepare the Mercury Storage EIS on July 2, 2009; ends on August 17, 2009.

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Logic meets psychology 1 Marian Counihan What happens when logic and psychology meet?  

E-Print Network (OSTI)

Logic meets psychology 1 Marian Counihan What happens when logic and psychology meet? 27 September) tel. 020 - 525 4531 Universiteit van Amsterdam Core logic course #12;Logic meets psychology 2 Marian course #12;Logic meets psychology 3 Marian Counihan What happens when logic and psychology meet? Two

Löwe, Benedikt

342

Electric Drive Vehicle Climate Control Load Reduction  

Energy.gov (U.S. Department of Energy (DOE))

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

343

Electric Drive Vehicle Climate Control Load Reduction  

Energy.gov (U.S. Department of Energy (DOE))

2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

344

Evaluation on Cooling Energy Load with Varied Envelope Design for High-Rise Residential Buildings in Malaysia  

E-Print Network (OSTI)

With the development of the economy in the recent years, Malaysia is maintaining a high economic growth and therefore, its energy consumption increases dramatically. Residential buildings are characterized by being envelope-load dominated buildings...

Al-Tamimi, N.; Fadzil, S.

2010-01-01T23:59:59.000Z

345

2013 ALS User Meeting Highlights  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 ALS User Meeting Highlights 2013 ALS User Meeting Highlights 2013 ALS User Meeting Highlights Print This year's ALS User Meeting launched with a welcome from Users' Executive Committee Chair Corie Ralston and LBNL Director Paul Alivisatos. ALS Director Roger Falcone followed with a "state of the ALS" presentation that began with a reminder of the ALS mission, which he noted remains true even in the midst of a government shutdown: "Supporting users in doing outstanding science in a safe environment." Falcone gave the 414 meeting attendees an update on the ALS beamlines, which included good news about increased user numbers thanks to the new RAPIDD access system, enhanced robotics, and remote capabilities. Falcone reflected that ALS metrics continue to represent our highly productive users-the number of journal articles and papers per user that come from ALS research have continued to grow in the past year. Looking forward, Falcone touched on how a proposed ALS upgrade to a diffraction-limited light source would increase scientific capabilities.

346

2013 ALS User Meeting Highlights  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 ALS User Meeting Highlights 2013 ALS User Meeting Highlights 2013 ALS User Meeting Highlights Print Thursday, 24 October 2013 09:06 This year's ALS User Meeting launched with a welcome from Users' Executive Committee Chair Corie Ralston and LBNL Director Paul Alivisatos. ALS Director Roger Falcone followed with a "state of the ALS" presentation that began with a reminder of the ALS mission, which he noted remains true even in the midst of a government shutdown: "Supporting users in doing outstanding science in a safe environment." Falcone gave the 414 meeting attendees an update on the ALS beamlines, which included good news about increased user numbers thanks to the new RAPIDD access system, enhanced robotics, and remote capabilities. Falcone reflected that ALS metrics continue to represent our highly productive users-the number of journal articles and papers per user that come from ALS research have continued to grow in the past year. Looking forward, Falcone touched on how a proposed ALS upgrade to a diffraction-limited light source would increase scientific capabilities.

347

DRAFT/PRELIMINARY MEETING AGENDA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

F:/TEC/TEC Final Agenda_7_11.doc F:/TEC/TEC Final Agenda_7_11.doc 7/12/01 FINAL AGENDA U.S. DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP CINCINNATI, OHIO JULY 17-19, 2001 Tuesday, July 17, 2001 8:00 - 8:30 a.m. Continental Breakfast (Topic Group Members) Fourth Floor Foyer 8:30 - 10:00 a.m. Topic Group Meetings (Topic Group Members) Meetings DOE Lead - Tribal Issues J. Holm Salons B/C - Training and Medical Issues E. McNeil Salons D/E 10:00 -10:30 a.m. Break Fourth Floor Foyer 10:30 - 12: 00 Noon Topic Group Meetings (Continued) 12:00 Noon - 1:15 p.m. Lunch Break (on your own) 1:15 - 3:00 p.m. Topic Group Meetings (Topic Group Members) Meetings DOE Lead - Consolidated Grant J. Holm Salons B/C - Training and Medical Issues E. McNeil Salons D/E 2:00 - 5:00 p.m. GENERAL REGISTRATION Fourth Floor Registration Room

348

{Control of Residential Load Management Networks Using Real Time Pricing  

E-Print Network (OSTI)

loads to deliver load following and regulation, withproducts like load following and spinning reserve.following of constant power references. Chapter 7 Implications of Load

Burke, William Jerome

2010-01-01T23:59:59.000Z

349

Tank Waste Corporate Board Meeting 03/05/09 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tank Waste Corporate Board Meeting 03/05/09 Tank Waste Corporate Board Meeting 03/05/09 Tank Waste Corporate Board Meeting 03/05/09 The following documents are associated with the Tank Waste Corporate Board Meeting held on March 5th, 2009. Overview of Integrated Waste Treatment Unit Desired PU Loading During Vitrification HLW System Integrated Project Team Waste Determination and Section 3116 of the 2005 National Defense Authorization Act - HQ Perspective Status of Art & Practice of Performance Assessment within the DOE Complex Experience from the Short Course on Introduction to Nuclear Chemistry and Fuel Cycle Separations and Future Educational Opportunities Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission Performance Assessment Community of Practice Action Item Review and Status

350

SSRLUO-EC Meetings Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Minutes | Members | Home | Activism | Past Committees Minutes | Members | Home | Activism | Past Committees SSRLUO Executive Committee Meetings All users are encouraged to participate in SSRL Users' Organization activities. Meetings of the SSRL Users' Organization Executive Committee (SSRLUO-EC) include open sessions that all members of the SSRL user community are invited to attend. Meetings will be held about every four months. If you have issues that you would like to present to the committee or have added as a discussion item on the next agenda, please feel free to contact any of the members listed below: Joy Andrews, CSU East Bay (Ex-Officio) Yuji Arai, Clemson University Rebecca Fenn, Stanford University Jesse Guzman, UCSC Katherine Kantardjieff, CSU Fullerton Chris Kim, Chapman University (Ex-Officio)

351

More Than Meets the Eye  

NLE Websites -- All DOE Office Websites (Extended Search)

More Than Meets the Eye Jefferson Lab invites you on a journey into the realm of the unseen. Join us as we explain how scientists use our facility to learn more about the world's smallest particle _ the quark. Narrative poem and storyboard by: John Anderson II Illustrations and design by: John Thomas Answers to word find on last page. QUARKS: More Than Meets the Eye The sun, the moon, the galaxy and every single star, consist of tiny particles that make up who we are. These particles are everywhere, in everything around.

352

Milwaukee Meeting Summary - July, 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milwaukee Meeting Summary - July, 1998 Milwaukee Meeting Summary - July, 1998 Over 150 Members, participants, and observers representing state, tribal, and local governments, regional groups, industry, professional organizations, and the Department of Energy, met to address a variety of issues related to DOE's transportation activities for radioactive materials. A number of Departmental Programs with transportation components were represented, including: the Office of Environmental Management, the Office of Civilian Radioactive Waste Management (including the Yucca Mountain Project Office), the Office of Naval Reactors, the Waste Isolation Pilot Project, and the Office of Defense Programs. Topic Group Summaries and Comments DOE Program Office Discussions General Planning Breakout Discussions

353

SRP Scientific Meeting: Depleted Uranium  

Science Journals Connector (OSTI)

London, January 2002 The meeting was organised by the SRP to review current research and discuss the use, dispersion into the environment and radiological impact of depleted uranium (DU) by the UK and US in recent military conflicts. Brian Spratt chaired the morning session of the meeting and stressed the need to gauge the actual risks involved in using DU and to balance professional opinions with public mistrust of scientists and government bodies. He asked whether more could be done by the radiation protection profession to improve communication with the media, pressure groups and the public in general. Ron Brown, of the MOD Dstl Radiological Protection Services, gave a thorough overview of the origins and properties of DU, focusing on munitions, in the UK and abroad and public concerns arising from its use in the 1991 Gulf War. He gave a brief overview of past DU munitions studies by the UK and US governments and contrasted this with the lack of hard data used to back up claims made by pressure groups. He compared the known risks of DU with other battlefield risks, e.g. biological agents, chemical attacks and vaccines, and questioned whether peacetime dose limits should apply to soldiers on the battlefield. Barry Smith, of the British Geological Survey, spoke on DU transport, pathways and exposure routes focusing on groundwater as an important example in the Former Yugoslav Republic of Kosovo. He discussed the large amount of work that has already been done on natural uranium in groundwater, with particular emphasis on its mobility within the soil and rock profile being strongly dependent on precipitation and the local geochemical conditions. Therefore, generic risk assessments will not be sufficient in gauging risks to local populations after the introduction of DU into their environment; local geochemical conditions must be taken into account. However, experiments are required to fully appreciate the extent to which DU, particularly DU:Ti alloys used in munitions, disperses into the environment in a variety of soil types. Barry outlined recent computer modelling work investigating the time taken for DU to migrate from a buried munition to a borehole in three different scenarios. The modelling revealed times from 30 years to 5 ? 109 years depending on the local geochemical environment and the depth of the DU penetrator in the soil profile. This suggests the real possibility of borehole contamination within a human lifetime in wet conditions similar to those found in Kosovo. Nick Priest, of Middlesex University, discussed methods of biological monitoring for natural and depleted uranium. The preferred method of detection is by 24 h urine sampling, with measurement of the total mass or isotopic ratios of uranium using mass spectroscopy (ICPMS). This is because uranium is only deposited in new areas of bone growth, a slow process in healthy adults, the remainder is filtered by the kidneys and excreted in urine, giving a non-invasive and rapid sample collection method. Nick also described a rapid assessment technique to look for total uranium and DU in a sample, using a multi-collector ICPMS, specifically looking at the 235U:238U ratio with 236U as a tracer to determine the total mass of uranium present and its source. The MC-ICPMS method was applied in a BBC Scotland funded study of uptakes of uranium in three populations in the Balkans during March 2001. Variable levels of DU were found in each population. The age of the subject was found to influence the excretion of natural uranium and DU to the same degree, increasing age leading to increased excretion. Overall, the levels of DU were extremely small (tens of µg), but DU was found to be present in each population investigated. The MC-ICPMS method is capable of detecting  1% DU in natural uranium and Nick intends to extend the study to include ground and drinking water samples and food in the same populations. Neil Stradling gave a talk on the contribution of the NRPB to the WHO report on DU published in April 2001. It addressed the biokinetics of inhaled uranium

David Kestell

2002-01-01T23:59:59.000Z

354

ARM - 2006 Science Team Meeting Pictures  

NLE Websites -- All DOE Office Websites (Extended Search)

Pictures Pictures 2006 Meeting 2006 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Posters Presentations Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 2006 Science Team Meeting Pictures Photos ARM Chief Scientist Warren Wiscombe presents "The ARM Chief Scientist Report" during Tuesday morning's plenary session. The Instantaneous Radiative Flux (IRF) Working Group report is presented at Tuesday morning's plenary session. Dr. David Thomassen, Acting Associate Director of DOE's Office of Biological and Environmental Research, attended this year's ARM Science Team Meeting. Meeting attendees listen at the morning plenary session. Rick Petty engages in a discussion after the plenary session. The ARM Science Team meeting allows scientists to collaborate and share their data and research.

355

Molar Growth  

NLE Websites -- All DOE Office Websites (Extended Search)

Molar Growth Molar Growth Name: Daniel Location: N/A Country: N/A Date: N/A Question: What animals have molars that grow continuously ? Replies: No mammals that I or my colleagues are aware of, only some few whose incisors grow continuously. J. Elliott Most vertebrates are "polyphyodonts" meaning that they replace teeth continuously through out their lives. All the teeth aren't replaced at once, but in waves so that the animals always have functional teeth around those that are lost. Most mammals are "diphyodonts", which means that they have only 2 sets of teeth: baby teeth and adult teeth. The teeth of herbivore mammals, those which eat grasses, seem to grow throughout their lives. But really, the teeth are very long and extend far down into the jaws. They gradually move up in the jaw toward the surface over time, with the area beneath them filling in with bone.

356

Macro Data Load: An Efficient Mechanism for Enhancing Loaded Data Reuse  

E-Print Network (OSTI)

Macro Data Load: An Efficient Mechanism for Enhancing Loaded Data Reuse Lei Jin and Sangyeun Cho, Member, IEEE Abstract--This paper presents a study on macro data load, a novel mechanism to increase the amount of loaded data reuse within a processor. A macro data load brings into the processor a maximum

Cho, Sangyeun

357

North American Energy Ministers Meeting  

Energy.gov (U.S. Department of Energy (DOE))

Washington– The North American Energy Ministers met today, in response to the call of the North American Leaders, to advance an energy agenda that expands the continent’s leadership in energy, strengthens North American energy security, supports shared economic prosperity and environmental performance. This meeting builds upon a long, productive and successful history of trilateral North American collaboration on energy issues.

358

CAHNRS Safety Committee Meeting Minutes  

E-Print Network (OSTI)

that although the law states that PIs are responsible for the safety of all employees in their work siteCAHNRS Safety Committee Meeting Minutes December 10, 2013 Present: Daniel Edge-Garza, Rick Rupp lab safety specialist, replacing Sarah Greer. Tom will eventually be the lab safety manager. He

Collins, Gary S.

359

Rare-Earth Research Meeting  

Science Journals Connector (OSTI)

Rare-Earth Research Meeting ... The 27th Rare Earth Research Conference will take place at the Village at Squaw Valley in Olympic Valley, Calif.—the site of the 1960 Winter Olympic Games—on June 22–26, 2014. ... Rare-earth element research spans several disciplines and brings together chemists, engineers, physicists, and materials scientists. ...

SOPHIE ROVNER

2013-12-23T23:59:59.000Z

360

AAAS 2012 Annual Meeting Program  

Science Journals Connector (OSTI)

...The EurekAlert! Web site hosts the AAAS Meeting...Low-Carbon Innovation for an Electricity-Dependent World Organized...Sustainable Biofuel Production Organized by Nicole...Cheong, University of Kansas, Lawrence Water Security...Revolution: Emerging Production Methods for Meat Alternatives...

2011-11-11T23:59:59.000Z

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

AAAS 2012 Annual Meeting Program  

Science Journals Connector (OSTI)

...The EurekAlert! Web site hosts the AAAS Meeting...Sustainable Biofuel Production Organized by Nicole...Low-Carbon Innovation for an Electricity-Dependent World Organized...Cheong, University of Kansas, Lawrence Water Security...Revolution: Emerging Production Methods for Meat Alternatives...

2012-01-06T23:59:59.000Z

362

Secretary Bodman Meets with Global Energy Ministers at the International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Global Energy Ministers at the Global Energy Ministers at the International Energy Forum in Qatar Secretary Bodman Meets with Global Energy Ministers at the International Energy Forum in Qatar April 24, 2006 - 10:25am Addthis Bodman emphasizes the need for international cooperation to improve global energy security DOHA, QATAR - U.S. Secretary of Energy Samuel W. Bodman attended the 10th International Energy Forum (IEF) in Doha, Qatar, today to discuss the need for international efforts to increase individual and global energy security and encourage market stability. Energy Ministers from the world's major producing and consuming nations were in attendance at the meeting taking place April 23-24, 2006. "In order to sustain the strong global economic growth we've seen in recent years, consumers and producers must work together to encourage transparency

363

Sensible and Latent Cooling Load Control Using Centrally-Ducted, Variable-Capacity Space Conditioning Systems in Low Sensible Load Environments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sensible and Latent Cooling Load Control Using Centrally-Ducted, Variable-Capacity Space Conditioning Systems in Low Sensible Load Environments James Cummings BA-PIRC; Florida Solar Energy Center Presented at BA Summer Meeting, July 26, 2012 The gist of my message * Fixed capacity AC systems generally provide good RH control in typical residences. * In low-load homes, they may be less effective in achieving good RH control. * On the other hand, variable capacity AC systems have several characteristics which can provide improved RH control in homes. - Both Nordyne and Carrier have variable capacity units, varying from about 40% to 100% of nominal full capacity. - What is variable capacity? -- condenser fan, compressor speed, and AHU fan speed. The gist, continued

364

PASSIVE DETECTION OF VEHICLE LOADING  

SciTech Connect

The Digital Imaging and Remote Sensing Laboratory (DIRS) at the Rochester Institute of Technology, along with the Savannah River National Laboratory is investigating passive methods to quantify vehicle loading. The research described in this paper investigates multiple vehicle indicators including brake temperature, tire temperature, engine temperature, acceleration and deceleration rates, engine acoustics, suspension response, tire deformation and vibrational response. Our investigation into these variables includes building and implementing a sensing system for data collection as well as multiple full-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones, video cameras and thermocouples. The full scale testing includes both a medium size dump truck and a tractor-trailer truck on closed courses with loads spanning the full range of the vehicle's capacity. Statistical analysis of the collected data is used to determine the effectiveness of each of the indicators for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators and combine the results to achieve a more accurate measurement than any of the indicators could provide alone.

Garrett, A.

2012-01-03T23:59:59.000Z

365

When smart grid meets PHEVs: a smart load distribution mechanism in smart grid  

Science Journals Connector (OSTI)

The economic benefits of our method are presented in Table 3.... It is shown that our algorithm can benefit the power system and provide a support to healthier operation of the power system. The larger scale of ...

Kai Xing; Fengjuan Zhang; Yi Liang; Dechang Chen

2014-08-01T23:59:59.000Z

366

Online Load Balancing for Related Machines 1 Piotr Berman  

E-Print Network (OSTI)

), the load of a machine i in schedule s and Load(s), the load of entire schedule s as follows: load(s; i) = 1On­line Load Balancing for Related Machines 1 Piotr Berman The Pennsylvania State University of randomized algorithms for this problem. Key Words: on­line algorithm, load balancing, related machines

Charikar, Moses

367

Hanford Site C Tank Farm Meeting Summary - May 2011 | Department...  

Office of Environmental Management (EM)

1 Hanford Site C Tank Farm Meeting Summary - May 2011 Hanford Site C Tank Farm Meeting Summary More Documents & Publications Hanford Site C Tank Farm Meeting Summary - September...

368

Hanford Site C Tank Farm Meeting Summary - March 2010 | Department...  

Office of Environmental Management (EM)

March 2010 Hanford Site C Tank Farm Meeting Summary - March 2010 Meeting Summary for Development of the Hanford Site C Tank Farm Performance Assessment Meeting Summary for...

369

2012_0411_PIC_Meeting_Summary_v1  

NLE Websites -- All DOE Office Websites (Extended Search)

April 11, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATIONS COMMITTEE MEETING April 11, 2012 Kennewick, WA Topics in this Meeting Summary...

370

2012_0411_PIC_Meeting_Summary_v1  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft Meeting Summary October 31, 2012 DRAFT MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATIONS COMMITTEE MEETING October 31, 2012 Richland, WA Topics in...

371

TEC Meeting Summaries - September 2006 | Department of Energy  

Office of Environmental Management (EM)

September 2006 TEC Meeting Summaries - September 2006 Green Bay, Wisconsin (September 2006) Meeting Summaries Items Available for Download Agenda Participants List TEC Meeting...

372

QA Corporate Board Meeting - February 2014 | Department of Energy  

Office of Environmental Management (EM)

February 2014 QA Corporate Board Meeting - February 2014 14th EM Quality Assurance Corporate Board Meeting Meeting Location: Teleconference Room: NA Documents Available for...

373

TEC Meeting Summaries - July 1993 | Department of Energy  

Office of Environmental Management (EM)

July 1993 TEC Meeting Summaries - July 1993 Chicago, Illinois (July 20-23, 1993) Meeting Summaries Items Available for Download TEC Meeting Notes More Documents & Publications TEC...

374

DOE Safety and Security Reform Meeting | Department of Energy  

Office of Environmental Management (EM)

DOE Safety and Security Reform Meeting DOE Safety and Security Reform Meeting Meeting Date: August 13, 2010 HSS senior managers with lead responsibilities in DOE's safety and...

375

Focus Group Meeting (Activities Status) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 19, 2011 Meeting Agenda, Summary and 2011 Directives Reform Status Documents Available for Download Meeting Agenda Meeting Summary and Participants Draft Work Group Matrix Key...

376

DOE/Labor Leadership Roundtable Meetings | Department of Energy  

Office of Environmental Management (EM)

Date: January 25, 2011 March 16, 2010 Deputy Secretary Roundtable Meeting with Unions Meeting agenda, summary and Safety and Security Reform Plan Meeting Date: March 16, 2010...

377

October 2 & 3, 2013 Meeting of the Electricity Advisory Committee...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Electricity Advisory Committee Archived Meetings 2008-2013 EAC 2013 Meetings October 2 & 3, 2013 Meeting of the Electricity Advisory Committee October 2 & 3,...

378

June 16 & 17, 2014 Meeting of the Electricity Advisory Committee...  

Energy Savers (EERE)

Services Electricity Advisory Committee Archived Meetings 2008-2014 EAC 2014 Meetings June 16 & 17, 2014 Meeting of the Electricity Advisory Committee June 16 & 17,...

379

Fuel Cell Projects Kickoff Meeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fuel Cell Projects Kickoff Meeting Fuel Cell Projects Kickoff Meeting Presentation by Nancy Garland at a meeting on fuel cell projects on February 13 - 14, 2007....

380

Fuel Cell Kickoff Meeting Agenda | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fuel Cell Kickoff Meeting Agenda Fuel Cell Kickoff Meeting Agenda This agenda provides information about the fuel cell projects meeting in February 2007. newfcagenda0207.pdf...

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Meeting Minutes from Automated Home Energy Management System Expert Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Energy Management System Expert Meeting Home Energy Management System Expert Meeting October 1-2, 2009 AGENDA - Day 1 8:30 - 8:45 Welcome and Debriefing of Building America and Home Energy Management Research- Lew Pratsch, DOE 8:45 - 9:15 Utilities Trends- Smart Grid Projects and Integration With Home Controls - Mike Keesee, SMUD 9:15 - 9:45 Thoughts on Controls System Performance Requirements - Rich Brown, LBL 9:45 - 10:15 Efficiency Trends in Consumer Electronics - Kurtis McKenney, TIAX 10:15 - 10:30 Session Break 10:30 - 11:00 Cloud Computing (Web Data Computing, Data Storage) Trends - Troy Batterberry, Microsoft 11:00- 11:30 Cloud Computing (Web Data Computing, Data Storage) Trends - Tom Sly via Net Conference 11:30 - 12:00 Smart Appliance Trends / Home Area Network Trends - David Najewicz, GE

382

Town Hall meeting | OpenEI Community  

Open Energy Info (EERE)

Town Hall meeting Town Hall meeting Home Graham7781's picture Submitted by Graham7781(1992) Super contributor 16 November, 2012 - 11:23 LEDS the focus of Monday's 10 a.m. Town Hall Meeting LEDS Town Hall meeting What: OpenEI's town hall meeting is a half-hour open forum for discussions on energy topics with NREL's OpenEI team. Find out how your fellow researchers, students, teachers and energy professionals are using energy data, maps and tools. Graham7781's picture Submitted by Graham7781(1992) Super contributor 19 September, 2012 - 13:40 Town Hall Meeting October 1st, 2012 OpenEI Town Hall meeting What: OpenEI's town hall meeting is a half-hour open forum for discussions on energy topics with NREL's OpenEI team. Find out how your fellow researchers, students, teachers and energy professionals are using energy

383

QER Public Meeting: Petroleum Product Transmission & Distribution  

Energy.gov (U.S. Department of Energy (DOE))

May 27, 2014 Public Meeting: Petroleum Product Transmission & Distribution (including CO2/EOR) On May 27, 2014, the DOE will hold a public meeting in New Orleans, Louisiana. The May 27, 2014 public meeting will feature facilitated panel discussions, followed by an open microphone session. Persons desiring to speak during the 6 open microphone session at the public meeting should come prepared to speak for no more than 3 minutes and will be accommodated on a first- come, first- serve basis, according to the order in which they register to speak on a sign-in sheet available at the meeting location, on the morning of the meeting. In advance of the meeting, DOE anticipates making publicly available a briefing memorandum providing useful background information regarding the topics under discussion at the meeting. DOE will post this memorandum on its website: http://energy.gov

384

1999 AERA Annual Meeting Montreal, Quebec, Canada  

E-Print Network (OSTI)

1999 AERA Annual Meeting Montreal, Quebec, Canada 1 Evaluating the Effectiveness of On styles. #12;1999 AERA Annual Meeting Montreal, Quebec, Canada 2 Method: This study was initiated to allow

Larkin, Teresa L.

385

September 15, 2014 Lab Commission Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE))

This meeting was the second meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). The Commission members heard opening remarks by Co-Chairs TJ...

386

September 5, 2014 SEAB Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE))

This meeting was the fourth quarterly meeting of the Secretary of Energy Advisory Board (SEAB).  SEAB members heard opening remarks by Secretary Moniz and the Co-Chair John Deutch.  The first...

387

November 4, 2014 LAB COMMISSION MEETING MINUTES  

Energy.gov (U.S. Department of Energy (DOE))

The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) wasconvened for its fourth meeting at 9:00 AM on November 4, 2014. The meeting included three panels...

388

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network (OSTI)

Ad Hoc Assessment Committee Meeting Notes November 8, 2007 Present: Rula Awwad Rafferty timeline had been modified after input from the ad hoc assessment committee at its previous meeting

O'Laughlin, Jay

389

Transport Modeling Working Group Meeting Reports  

Energy.gov (U.S. Department of Energy (DOE))

Reports from meetings of the Transport Modeling Working Group, which meets twice per year to exchange information, create synergies, share experimental and computational results, and collaboratively develop methodologies for and understanding of transport phenomena in polymer electrolyte fuel cell stacks.

390

Chairs Meeting - September 2010 | Department of Energy  

Office of Environmental Management (EM)

September 2010 Chairs Meeting - September 2010 Environmental Management Site-Specific Advisory Board Chairs Meeting September 15th and 16th, 2010 La Fonda on the Plaza Santa Fe,...

391

Supporting the Meeting Report Carlos J. Costaa  

E-Print Network (OSTI)

Supporting the Meeting Report Process Carlos J. Costaa Pedro Antunesb J. Ferreira Diasc carlos market, Electronic Meeting Systems (EMS) have been viewed since the beginning of the 1980's as the Holy

Antunes, Pedro

392

Economic Growth Policies & Economic Growth Theory Influences.  

E-Print Network (OSTI)

?? The aim of this thesis is to describe the presence of theories for economic growth in municipalities’ economic growth strategies, and to compare the… (more)

Hallden, Sophie

2012-01-01T23:59:59.000Z

393

3116 Public Meeting Summaries- July 2007  

Energy.gov (U.S. Department of Energy (DOE))

The United States Nuclear Regulatory Commission and the United States Department Of Energy Public Meeting

394

TEAM CUMBERLAND MEETING- April 30, 2014  

Energy.gov (U.S. Department of Energy (DOE))

The Team Cumberland Meeting was held at the Nashville Electric Service, Nashville, Tennessee on April 30, 2014.

395

ICEIWG Meeting Agenda: August 25, 2014  

Energy.gov (U.S. Department of Energy (DOE))

Indian Country Energy and Infrastructure Working Group (ICEIWG) meeting agenda for August 25, 2014, in Prior Lake, Minnesota.

396

Electricity Advisory Committee Meeting Presentations October...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes Panel...

397

Agenda: High Temperature Membrane Working Group Meeting  

Energy.gov (U.S. Department of Energy (DOE))

Agenda for the High Temperature Membrane Working Group (HTMWG) meeting on May 18, 2009, in Arlington, Virginia

398

G-7 Energy Ministers Meet in Rome  

Energy.gov (U.S. Department of Energy (DOE))

Secretary Moniz participated in meetings with fellow G-7 counterparts to discuss ways to strengthen collective energy security.

399

ICEIWG Meeting Agenda: May 15, 2014  

Energy.gov (U.S. Department of Energy (DOE))

Indian Country Energy and Infrastructure Working Group (ICEIWG) meeting agenda and summary for May 15, 2014, in San Diego, California.

400

J A Snipes, 46th APS Division of Plasma Physics Meeting, Savannah, GA 18 November 2004 Active and Fast Particle Driven Alfvn  

E-Print Network (OSTI)

Division of Plasma Physics Meeting, Savannah, GA 18 November 2004 Fast Particles Pass Through Alfvén Physics Meeting, Savannah, GA 18 November 2004 AE Drive and Damping Mechanisms TAE growth rate: 2 *( 1) d to kR from 0.6 to 17 cm-1 10 MHz sampling rate #12;J A Snipes, 46th APS Division of Plasma Physics

Snipes, Joseph A.

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EMAB Meeting Minutes for February 24, 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PUBLIC MEETING MINUTES Green Valley Ranch 2300 Paseo Verde Parkway - Henderson, Nevada 89052 February 24, 2011 2 Environmental Management Advisory Board February 24, 2011 Meeting Minutes TABLE OF CONTENTS Meeting Attendees .......................................................................................................................... 3 List of Acronyms ............................................................................................................................ 4 Opening Remarks............................................................................................................................ 6 EM Program Update ....................................................................................................................... 6

402

EMAB Meeting Minutes for June 23, 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL MANAGEMENT ADVISORY BOARD ENVIRONMENTAL MANAGEMENT ADVISORY BOARD to the U.S. DEPARTMENT OF ENERGY PUBLIC MEETING MINUTES U.S. Department of Energy 1000 Independence Avenue, SW - Forrestal Building Room 8E-089 Washington DC 20585 June 23, 2011 2 Environmental Management Advisory Board June 23, 2011 Meeting Minutes TABLE OF CONTENTS Meeting Attendees .......................................................................................................................... 3 List of Acronyms ............................................................................................................................ 5 Opening Remarks............................................................................................................................ 6

403

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network (OSTI)

Ad Hoc Assessment Committee Meeting Notes April 17, 2008 Present: Diane Armpriest, Rula. The consensus of the group was that the list should include ad hoc committee members, associate deans and on request. The ad hoc committee will not meet again this semester. Jeanne will call a meeting

O'Laughlin, Jay

404

Residential Load Management Program and Pilot  

E-Print Network (OSTI)

In 1986 LCRA embarked on residential load management to control peak summer loads. At that time, LCRA was considered a summer peaking utility, and residential air conditioning and water heating systems were selected for control. The program...

Haverlah, D.; Riordon, K.

1994-01-01T23:59:59.000Z

405

1994 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The 1994 Pacific Northwest Loads and Resources Study presented herein establishes a picture of how the agency is positioned today in its loads and resources balance. It is a snapshot of expected resource operation, contractual obligations, and rights. This study does not attempt to present or analyze future conservation or generation resource scenarios. What it does provide are base case assumptions from which scenarios encompassing a wide range of uncertainties about BPA`s future may be evaluated. The Loads and Resources Study is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the 1993 Pacific Northwest Loads and Resources Study, published in December 1993. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The Federal system and regional analyses for medium load forecast are presented.

United States. Bonneville Power Administration.

1994-12-01T23:59:59.000Z

406

Helicase Loading at Chromosomal Origins of Replication  

E-Print Network (OSTI)

Loading of the replicative DNA helicase at origins of replication is of central importance in DNA replication. As the first of the replication fork proteins assemble at chromosomal origins of replication, the loaded helicase ...

Bell, Stephen P.

407

Secretary Chu to Join President Obama at APEC Leaders Meeting | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APEC Leaders Meeting APEC Leaders Meeting Secretary Chu to Join President Obama at APEC Leaders Meeting November 10, 2011 - 4:27pm Addthis Washington D.C. - U.S. Energy Secretary Steven Chu will join President Barack Obama at the Asia-Pacific Economic Cooperation (APEC) Ministers and Economic Leaders' Meetings in Honolulu, Hawaii. APEC brings member economies together to facilitate economic cooperation, expand trade, and promote job growth. Secretary Chu will participate in the closing plenary session, delivering a presentation focusing on energy efficiency in appliances. WHAT: Energy Secretary Steven Chu to deliver a presentation to APEC leaders on energy efficiency in appliances. WHEN: Sunday, November 13, 2011 2:45 PM HAST WHERE: JW Marriott Ihilani 92-1001 Olani St., Kapolie, HI 96707

408

Logic meets psychology 1 Marian Counihan What happens when logic and psychology meet?  

E-Print Network (OSTI)

Logic meets psychology 1 Marian Counihan What happens when logic and psychology meet? 27 September) tel. 020 - 525 4531 Universiteit van Amsterdam Core logic course #12;Logic meets psychology 2 Marian Counihan What happens when logic and psychology meet? Two perspectives on the matter: - a psychologist

Löwe, Benedikt

409

Eyeball Growth  

NLE Websites -- All DOE Office Websites (Extended Search)

Eyeball Growth Eyeball Growth Name: Jade Hawk Status: N/A Age: N/A Location: N/A Country: N/A Date: N/A Question: Okay, I know I'm supposed to be able to answer questions here, but a friend who teaches grades 7 & 8 general science wants to know if the human eyeball is fully grown at birth. I checked my references, which are rather limited when it comes to human physiology, and found nothing. Can anyone help? Replies: The eye will still develop in size, pigmentation, and neurologically but I don't have the details here at hand. A kitten is born with eyes even more immature than human babies. Besides having sealed eyes that take about a week to open, they have retinas that a avascularized and need to undergo neovascularization to properly nourish and oxygenate the tissue. We have used the kitten to study retinopathy of prematurity, a condition caused in part by increased inspired oxygen. The kitten is also used in the study of diabetic retinopathy which a I think is the leading cause of blindness in the US. Look up publications by Dale Phelps, MD.

410

Analysis Methodology for Industrial Load Profiles  

E-Print Network (OSTI)

ANALYSIS METHODOLOGY FOR INDUSTRIAL LOAD PROFILES Thomas W. Reddoch Executive Vice President Eleclrolek Concepts, Inc. Knoxvillc, Tennessee ABSTRACT A methodology is provided for evaluating the impact of various demand-side management... (OSM) options on industrial customers. The basic approach uses customer metered load profile data as a basis for the customer load shape. OSM technologies are represented as load shapes and are used as a basis for altering the customers existing...

Reddoch, T. W.

411

A Novel Approach to Determining Motor Load  

E-Print Network (OSTI)

A NOVEL APPROACH TO DETERMINING MOTOR LOAD by Michael Brown Georgia Tech Research Institute Atlanta, Georgia ABSTRACf Properly sized electric motors are essential if industrial plant efficiency is to be optimized and energy costs... minimized. Because of the difficully in making power measurements on three phase motors, loading is rarely, if ever, checked. A simple indication of motor load can be achieved by measuring operating speed because speed and load are almost linearly...

Brown, M.

412

Chapter 6 - Stage 3: Data Load  

Science Journals Connector (OSTI)

Summary This chapter discusses the Data Load stage of the Guerrilla Analytics workflow. Data Load involves getting data from a receipt location (generally the file system) and loading it into the Data Manipulation Environment (DME). In this chapter, you will learn about the various activities that take place at Data Load. You will learn about the pitfalls and risks in these activities. You will then learn a number of practice tips to mitigate those risks.

Enda Ridge

2015-01-01T23:59:59.000Z

413

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

BPA), the basic requirements for an improved load model were determined. These requirements included modeling the substation

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

414

DRAFT/PRELIMINARY MEETING AGENDA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Transportation External Coordination Working Group (TEC) July 24-25, 2007 Kansas City, Missouri DAY 1 -Tuesday, July 24, 2007 Ballroom Level: 7:30 a.m. - 8:00 a.m. Continental Breakfast and Registration New York Room 8:00 a.m. - 8:15 a.m. Welcome and Meeting Overview Welcome - Mayor Pro Tem Bill Skaggs, Kansas City, Missouri Introduction, Meeting Overview - Judith Holm, Supervisor, Intergovernmental & Operations Division, OCRWM/OLM 8:15 a.m. - 10:15 a.m. Plenary I - DOE Program Updates Office of Civilian Radioactive Waste Management - Edward Sproat III, Director Office of Logistics Management Update - Gary Lanthrum, Director Office of Environmental Management - James Rispoli, Assistant Secretary

415

The sixth Standing Committee Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

sixth Standing Committee Meeting sixth Standing Committee Meeting between DOE's Office of Environmental Management (EM) and the UK's Nuclear Decommissioning Authority (NDA) was held on March 10, 2010, on the margins of the Waste Management 2010 Conference in Phoenix, Arizona. The Committee monitors collaboration activities between the two organizations and was pleased to hear of the progress being made by the respective expert groups in the current five topic areas: Fuel Drying, Glass Chemistry, Hot Isostatic Pressing, D&D, and Tank Corrosion & Structural Integrity. The Committee agreed that these topic area discussions had lead to enhanced collaboration and identification of joint projects in a number of areas. Several new items were proposed for potential future collaboration, including other thermal

416

Electricity Advisory Committee Meeting Agenda  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agenda Agenda October 2 and 3, 2013 NRECA Building, Arlington, VA 1 Wednesday, October 2, 2013 12:00 to 1:00 pm EAC Leadership Committee Meeting 12:00 to 1:00 pm Registration Public Signups for Comments on Day 2 1:00 to 1:10 pm Welcome, Introductions and Developments since our June 2013 Meeting Richard Cowart, EAC Chair and David Meyer, EAC Designated Federal Officer 1:10 to 1:30 pm Update on the U.S. Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability's (OE) 2013 Programs and Initiatives Honorable Patricia Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability 1:30 to 2:10 pm Keynote: Melanie Kenderdine, Energy Counselor to the Secretary of Energy (Invited) 2:10 to 2:20 pm Break

417

Minutes of October 15 meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

10/15/99 Oscillations Measurements Working Group Meeting 10/15/99 Oscillations Measurements Working Group Meeting Deborah Harris Last modified: Tue Oct 26 09:57:25 CDT 1999 Oscillation Measurements Working Group Minutes Attendees: Bob Bernstein Steve Geer Debbie Harris Kevin McFarland (by phone) Steve Parke Rajendran Raja Panagiotis Spentzouris Ray Stefanksi Literature Search and Secure: Carl Albright has produced three lists of papers submitted to Los Alamos preprint server in the past year on the topics of 1: CP violation in neutrino mixing, 2: Matter effects and 3: Sterile neutrinos. General hope was expressed that he and Greg Anderson would sift through these papers and perhaps produce a "top ten" list for each. This list could exist on the web with links to the papers themselves, with hope that as people read the

418

DRAFT/PRELIMINARY MEETING AGENDA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AGENDA AGENDA U.S. DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP NEW ORLEANS, LOUISIANA JANUARY 29-30, 2002 Judith Holm, TEC Co-Chair, DOE-NTP Monday, January 28, 2002 4:00 - 6:00 p.m. Consolidated Grant Topic Group Meeting Judith Holm, DOE-National Transportation Program Tuesday, January 29, 2002 8:00 - 8:30 a.m. Continental Breakfast and General Registration Sue Martindale, Mary McConnell, SAIC 8:30 -12:00 p.m. Topic Group Meetings - Training and Medical Issues - Ella McNeil, DOE-Office of Transportation - Tribal - Judith Holm, DOE-National Transportation Program - Rail - Steve Hamp, DOE-National Transportation Program 10:00- 10:30 a.m. Break 12:00 - 1:30 p.m. Lunch Break (on your own) 1:30 -1:45 p.m. Welcome and State of the Program

419

DRAFT/PRELIMINARY MEETING AGENDA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP (TEC) SEPTEMBER 13-14, 2006 GREEN BAY, WISCONSIN DAY 1 -Wednesday, September 13, 2006 THREE CLANS COMPLEX - TURTLE/BEAR ROOMS 7:30 a.m. - 8:00 a.m. Continental Breakfast and Registration 8:00 a.m. - 9:00 a.m. Welcome and Meeting Overview - Posting of the Colors/Flag Song - Oneida Veterans' Color Guard/Oneida Drummers, Sovereign Oneida Nation of Wisconsin - Welcome - Councilman Paul Ninham, Sovereign Oneida Nation of Wisconsin - Introduction/Meeting Overview - Judith Holm, OCRWM, Office of Logistics Management 9:00 a.m. - 10:15 a.m. Plenary I - DOE Program Updates - Office of Civilian Radioactive Waste Management - Edward Sproat, III, Director, Office of Civilian Radioactive Waste

420

Information Resources: Conferences and Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Conferences and Meetings Conferences and Meetings DOE organizes three annual workshops to bring together a diverse gathering of participants-government, industry, academia, research institutions, energy efficiency organizations, utilities, retailers, and designers-to share insights, ideas, and updates on the rapidly evolving SSL market. Which Annual DOE SSL Workshops Are Right For You? R&D Manufacturing R&D Market Introduction When you must know... Latest breakthroughs from DOE-funded R&D projects Scientific pathways to improving performance and reducing costs New ideas for tough technical challenges Challenges of manufacturing LEDs, luminaires, drivers, and electronics New ideas to improve LED and OLED manufacturing processes, equipment, and costs Latest on product performance, selection, efficiency, quality, reliability, and cost effectiveness

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

TEC Meeting Evaluations Summary -- Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TEC Meeting Evaluation Summary TEC Meeting Evaluation Summary San Antonio, Texas February 6-7, 2008 Attendee Affiliation: TEC Member Organizations: 19 (38%) State, Tribal or Local Official: 21 (42%) U.S. Department of Energy: 2 (4%) DOE Contractor: 3 (6%) Other (e.g., AULG, DOT): 5 (10%) Assessment of Agenda Topics: DOE Program Updates: 42% very useful 58% somewhat useful Plenary I - Tribal Cultural Discussion: 40% very useful 36% somewhat useful 14% not useful 10% didn't attend Plenary II - Evaluation of Shortline Railroads 56% very useful 38% somewhat useful 6% not useful Plenary III - Addressing Risk Perception 74% very useful 16% somewhat useful 6% not useful 4% didn't attend Assessment of Topic Group Sessions Tribal: 23% very useful

422

DRAFT/PRELIMINARY MEETING AGENDA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL AGENDA FINAL AGENDA U.S. Department of Energy Transportation External Coordination Working Group (TEC) January 31 - February 1, 2007 Atlanta, Georgia DAY 1 -Wednesday, January 31, 2007 7:30 a.m. - 8:00 a.m. Continental Breakfast and Registration 8:00 a.m. - 8:30 a.m. Welcome and Meeting Overview Welcome - Christopher Wells, Southern States Energy Board (SSEB) Introduction, Meeting Overview - Judith Holm, Supervisor, Intergovernmental & Operations Division, OCRWM/OLM 8:30 a.m. - 9:30 a.m. Plenary I - DOE Program Updates Office of Environmental Management - Bill Spurgeon, Office of Transportation Office of Civilian Radioactive Waste Management - Gary Lanthrum, Director, Office of Logistics Management 9:30 a.m. -10:00 a.m. Plenary II - Overview of Proposed Rail Safety & Security Regulations

423

QER Public Meeting in Washington, DC: Enhancing Energy Infrastructure Resiliency and Addressing Vulnerabilities  

Energy.gov (U.S. Department of Energy (DOE))

Meeting Files: Video Recording of Event, Meeting Agenda, Federal Register Notice, Meeting Briefing Memo, Meeting Summary, Transcript of Meeting and Panelist Remarks

424

CoolCab Truck Thermal Load Reduction  

Energy.gov (U.S. Department of Energy (DOE))

2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

425

Combi Systems for Low Load homes  

Energy.gov (U.S. Department of Energy (DOE))

This presentation was delivered at the U.S. Department of Energy Building America Technical Update meeting on July 24-26, 2012.

426

The 4-H Club Meeting  

E-Print Network (OSTI)

only if they are needed. That is, when there is club business to transact. If needed, the business portion of the meeting should be led by elected club officers, and it should be short and interesting. Club business should be handled in a manner...://tcebookstore.org Visit Texas Cooperative Extension at http://texasextension.tamu.edu Educational programs conducted by Texas Cooperative Extension serve people of all ages regardless of socioeconomic level, race, color, sex, religion, handicap or national origin. Issued...

Howard, Jeff W.

2005-05-10T23:59:59.000Z

427

Structures buckling under tensile dead load  

Science Journals Connector (OSTI)

...the load measured with a load cell Gefran OC-K2D-C3...PY-2-F-100 (Gefran Spa). Data have been acquired with...elementsAmsterdamElsevier Data Supplement Data Supplement Structures buckling under tensile dead load. A movie of the experiments...

2011-01-01T23:59:59.000Z

428

Flow Duration Curve Load Duration Curve  

E-Print Network (OSTI)

and concentration data--select appropriate conversion factors 3. Develop Load Duration Curve 4. Plot observed data there has been no flow at this site #12;Gather daily flow rate data Load data into a spreasheet Sort largest, etc) Calculate percentage of days flow was exceeded: How do you estimate load with given data

429

Flow Duration Curve Load Duration Curve  

E-Print Network (OSTI)

given flow and concentration data--select appropriate conversion factors 3. Develop Load Duration Curve 4. Plot observed data with Load Duration Curve #12;What are they? How do you make one? #12;DescribesRangeFlows LowFlows 40 % of the time there has been no flow at this site #12;Gather daily flow rate data Load

430

HAMMER Steering Committee Meeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HAMMER Steering Committee Meeting HAMMER Steering Committee Meeting HAMMER Steering Committee Meeting September 11 - 13, 2012 The HAMMER Steering Committee is a group of nationally recognized leaders who offer their time and experience to HAMMER management in an interactive setting where everyone shares a common commitment-reducing health and safety risks to workers, emergency responders, and the public. Committee insight and recommendations strongly influence HAMMER policies, strategies, and direction. As an integral element of the partnership, the Steering Committee helps develop and sustain HAMMER. HAMMER Steering Committee Calendar of Events HAMMER Steering Committee Fact Sheet More Documents & Publications HSS Focus Group Meeting (Topical Meeting) Active Labor Unions and Organizations Interfacing With DOE

431

URTAC Meeting - December 4, 2013 | Department of Energy  

Energy Savers (EERE)

Meeting - December 4, 2013 Federal Register Notice for December 4, 2013 URTAC Meeting Web Ex for December 4, 2013 Meeting Minutes from the December 4, 2013 URTAC Meeting More...

432

Low reflectance radio frequency load  

DOE Patents (OSTI)

A load for traveling microwave energy has an absorptive volume defined by cylindrical body enclosed by a first end cap and a second end cap. The first end cap has an aperture for the passage of an input waveguide with a rotating part that is coupled to a reflective mirror. The inner surfaces of the absorptive volume consist of a resistive material or are coated with a coating which absorbs a fraction of incident RF energy, and the remainder of the RF energy reflects. The angle of the reflector and end caps is selected such that reflected RF energy dissipates an increasing percentage of the remaining RF energy at each reflection, and the reflected RF energy which returns to the rotating mirror is directed to the back surface of the rotating reflector, and is not coupled to the input waveguide. Additionally, the reflector may have a surface which generates a more uniform power distribution function axially and laterally, to increase the power handling capability of the RF load. The input waveguide may be corrugated for HE11 mode input energy.

Ives, R. Lawrence; Mizuhara, Yosuke M

2014-04-01T23:59:59.000Z

433

APS high heat load monochromator  

SciTech Connect

This document contains the design specifications of the APS high heat load (HHL) monochromator and associated accessories as of February 1993. It should be noted that work is continuing on many parts of the monochromator including the mechanical design, crystal cooling designs, etc. Where appropriate, we have tried to add supporting documentation, references to published papers, and calculations from which we based our decisions. The underlying philosophy behind performance specifications of this monochromator was to fabricate a device that would be useful to as many APS users as possible, that is, the design should be as generic as possible. In other words, we believe that this design will be capable of operating on both bending magnet and ID beamlines (with the appropriate changes to the cooling and crystals) with both flat and inclined crystal geometries and with a variety of coolants. It was strongly felt that this monochromator should have good energy scanning capabilities over the classical energy range of about 4 to 20 keywith Si (111) crystals. For this reason, a design incorporating one rotation stage to drive both the first and second crystals was considered most promising. Separate rotary stages for the first and second crystals can sometimes provide more flexibility in their capacities to carry heavy loads (for heavily cooled first crystals or sagittal benders of second crystals), but their tuning capabilities were considered inferior to the single axis approach.

Lee, W.K.; Mills, D.

1993-02-01T23:59:59.000Z

434

System and method employing a minimum distance and a load feature database to identify electric load types of different electric loads  

DOE Patents (OSTI)

A method identifies electric load types of a plurality of different electric loads. The method includes providing a load feature database of a plurality of different electric load types, each of the different electric load types including a first load feature vector having at least four different load features; sensing a voltage signal and a current signal for each of the different electric loads; determining a second load feature vector comprising at least four different load features from the sensed voltage signal and the sensed current signal for a corresponding one of the different electric loads; and identifying by a processor one of the different electric load types by determining a minimum distance of the second load feature vector to the first load feature vector of the different electric load types of the load feature database.

Lu, Bin; Yang, Yi; Sharma, Santosh K; Zambare, Prachi; Madane, Mayura A

2014-12-23T23:59:59.000Z

435

Global-Change Meetings, Workshops, and Conferences  

NLE Websites -- All DOE Office Websites (Extended Search)

Global-Change Meetings, Workshops, and Conferences While CDIAC itself does not maintain a complete listing of global-change meetings, we are happy to provide the following links to other World-Wide-Web sites that do maintain such a calendar. Please let us know if you find these useful, if there are others that can be added, or if any of the listed sites cease to provide this service. By providing these links, we do not wish to imply that CDIAC or the U.S. Department of Energy necessarily endorses any of the meetings that are listed. AGU Meetings AMS Meetings Home Page Global Change Calendar IGBP Meetings IISD Linkages - Upcoming Meetings on Cimate and the Atmosphere NASA's Earth Observing System National Center for Atmospheric Research (NCAR), Institute for the

436

Archived Meetings & Events | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Events » Archived Meetings & Events » Archived Meetings & Events Archived Meetings & Events Listed below are past events and meetings, organized by category. Meetings Women in Science, Technology, Engineering, and Math (STEM) Tweetup - Mar. 22, 2012 A conversation with leaders and experts from DOE, Education, and more about women in STEM on Twitter. Batteries and Energy Storage Information Meeting - Oct. 10, 2011 - Bethesda, MD Electricity Advisory Committee (EAC) meetings Workshops 2012 National Electric Transmission Congestion Study Workshop - San Diego, CA - Dec. 15, 2011 2012 National Electric Transmission Congestion Study Workshop - Portland, OR - Dec. 13, 2011 2012 National Electric Transmission Congestion Study Workshop - St. Louis, MO - Dec. 8, 2011 2012 National Electric Transmission Congestion Study Workshop -

437

Residential Energy Efficiency Stakeholder Meeting - Spring 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Residential Energy Efficiency Stakeholder Meeting - Spring 2012 Residential Energy Efficiency Stakeholder Meeting - Spring 2012 Residential Energy Efficiency Stakeholder Meeting - Spring 2012 The U.S. Department of Energy (DOE) Building America program held the second annual Residential Energy Efficiency Stakeholder Meeting on February 29-March 2, 2012, in Austin, Texas. At this meeting, hundreds of building industry professionals came together to share their perspective on the most current innovation projects in the residential buildings sector. This meeting provided an opportunity for researchers and industry stakeholders to showcase and discuss the latest in cutting-edge, energy-efficient residential building technologies and practices. The meeting also included working sessions from each Standing Technical Committee (STC), which outlined work that will best assist in overcoming

438

Fall 2005 Meeting of the ASA  

Gasoline and Diesel Fuel Update (EIA)

6 Meeting of the 6 Meeting of the American Statistical Association Committee on Energy Statistics and the Energy Information Administration In two adjacent files you may find unedited transcripts of EIA's fall 2006 meeting with the American Statistical Association Committee on Energy Statistics. Beginning with the fall 2003 meeting, EIA no longer edits these transcripts. Summaries of previous meetings may be found to the right of the Thursday and Friday transcripts. The public meeting took place October 6 and 7, 2006 in the Forrestal Building at 1000 Independence Ave., S.W., Washington, D.C. 20585. All of the plenary and two of the break-out sessions were in 8E-089. The two remaining break-out sessions were in 5E-069. The fall meeting agenda, papers, presentation slides and other materials

439

OpenEI Community - meetings + advisory group  

Open Energy Info (EERE)

Thoughts after the Thoughts after the Geothermal Regulatory Roadmap Advisory Meeting http://en.openei.org/community/blog/thoughts-after-geothermal-regulatory-roadmap-advisory-meeting The most recent meeting of the Advisory Group occurred on July 19th.  This was a big event for the team, as it was the first real project review meeting since we kicked off the meetings to develop flow charts.   I was really happy with the meeting outcomes.  We had a lot of constructive feedback from the group, and the consensus that the project is on a good course continues to build over time. meeting"

440

Fuel Cycle Technologies Annual Review Meeting Transactions Report  

SciTech Connect

The Fuel Cycle Technologies (FCT) program supports the Department of Energy’s (DOE’s) mission to: “Enhance U.S. security and economic growth through transformative science, technology innovation, and market solutions to meet our energy, nuclear security, and environmental challenges.” Goal 1 of DOE’s Strategic Plan is to innovate energy technologies that enhance U.S. economic growth and job creation, energy security, and environmental quality. FCT does this by investing in advanced technologies that could transform the nuclear fuel cycle in the decades to come. Goal 2 of DOE’s Strategic Plan is to strengthen national security by strengthening key science, technology, and engineering capabilities. FCT does this by working closely with the National Nuclear Security Administration and the U.S Department of State to develop advanced technologies that support the Nation’s nuclear nonproliferation goals.

Lori Braase; W. Edgar May

2014-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Meetings  

Science Journals Connector (OSTI)

...Lloyd, "A tilting air-lubricated piston gauge for pressures below 0.5" Hg...of boat and chair forms of cyclohexane ring systems"; S. M. Kupchan, "Chemistry...M~~B w. d A C 1" it, Direct Reading Flame Photometer...

1959-03-06T23:59:59.000Z

442

Meetings  

Science Journals Connector (OSTI)

...5 75 20 75 Australia Austria Cyprus Canada: Alberta British Columbia...director of the San Diego Museum of Natural History, is chairman of the...Synthesis and Transport in the Gas-trointestinal Tract, symp...Mon-tholon, Paris 90.) 10-12. Gas Chromatography, 2nd in-tern...

1959-04-17T23:59:59.000Z

443

Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

K Commercial Business Process Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Network Integration...

444

Meetings  

Science Journals Connector (OSTI)

...Wis-consin, Madison). 27-28...Soc. of Plant Taxonomists...Univ. of Illinois, Urbana...Southern Illinois Univ...American Chemical Soc. (Div...Com-mittee, Dow Chemical Co., 916...25-28. Plant Maintenance...Poliak, 341 Madison Ave., New...

1959-12-04T23:59:59.000Z

445

meetings  

Science Journals Connector (OSTI)

16th Biennial Conference On Chemical Education ... The website contains information on the plenary lectures, as well as on the more than 600 papers, both oral and posters, and the 80 workshops that will be available to participants at the conference. ...

2000-05-15T23:59:59.000Z

446

Meetings  

Science Journals Connector (OSTI)

...ratio. W. Tolles (Airborne Instruments Laboratory...as only a small fraction of the work involved...resolution and "cross-fire" dosimetry has...bacteria, and the release of progeny phage...FEATHER-WEIGHT Weighs only a fraction of comparable size...y radiation in airborne particles for periods...

1959-05-15T23:59:59.000Z

447

Meetings  

Science Journals Connector (OSTI)

...Institutionen for Medicinsk Fysik, Karolinska Institutet, Stockholm...15-20. Electromagnetic Theory, symp., Toronto, Ont...16-18. Circuit and Information Theory, intern. symp., Los Angeles...Devices. The extent to which the theory of collection tech-niques...

1959-05-15T23:59:59.000Z

448

Meetings  

Science Journals Connector (OSTI)

...AUTOCLAVES INCUBATORS * WATER BATHS OIL BATHS * DEEP FREEZERS REFRIGERATORS Write for comuplete information ; 6) about our full line...evaporator '.1 il It' is one with a full complement of modular, expandable accessories! Get it in a flash from Precision...

William I. Gay

1967-12-01T23:59:59.000Z

449

MEETINGS  

Science Journals Connector (OSTI)

...open-cycle principle, CRYO-TIP refrigerators provide temperatures from 150K to 200...four watts refrigeration. CRYO-TIP refrigerators are designed for maximum reliability...stabilizer to form a stable and sensi-tive modular spectropho-tometer-linear with absorb-ance...

1965-02-19T23:59:59.000Z

450

Meetings  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

451

Meetings  

Science Journals Connector (OSTI)

...Cooperative. (W. A. Frazier, Dept. of Horticulture, Oregon State Univ., Corvallis...Survey, Kanaalweg 3, Delft) 31-8. Horticulture, intern. congr., Brus-sels, Belgium...Tex. (C. L. Amick, Day Brite Lighting, Inc., P.O. Box 141, St. Louis...

1962-06-22T23:59:59.000Z

452

Meetings  

Science Journals Connector (OSTI)

...samples. A special LINDE insulation holds evaporation loss to...Ufting Handle Special LINDE Insulation Predict Stoage Baset Removole...subject to be announced; specifications: 14" x 8Y85 cast-aluminum...effects"; M. Blackman, "Thermal expan-sion"; R. W...

1959-03-06T23:59:59.000Z

453

Geothermal Resources Council Annual Meeting - Doug Hollett Presentatio...  

Energy Savers (EERE)

Resources Council Annual Meeting - Doug Hollett Presentation, October 2011 Geothermal Resources Council Annual Meeting - Doug Hollett Presentation, October 2011 Keynote...

454

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation...  

Office of Environmental Management (EM)

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Solicitation...

455

High payload six-axis load sensor  

DOE Patents (OSTI)

A repairable high-payload six-axis load sensor includes a table, a base, and at least three shear-pin load transducers removably mounted between the table and the base. Removable mounting permits easy replacement of damaged shear pins. Preferably, the shear-pin load transducers are responsive to shear forces imparted along the two axes perpendicular to an axis of minimum sensitivity characteristic of the transducer. Responsive to an applied shear force, each shear-pin load transducer can produce an electrical signal proportional to the reaction force. The load sensor can further include a structure for receiving the proportional electrical signals and computing the applied load corresponding to the proportional electrical signals. The computed load can be expressed in terms of a three-dimensional XYZ Cartesian coordinate system.

Jansen, John F. (Knoxville, TN); Lind, Randall F. (Knoxville, TN)

2003-01-01T23:59:59.000Z

456

High voltage load resistor array  

DOE Patents (OSTI)

A high voltage resistor comprising an array of a plurality of parallel electrically connected resistor elements each containing a resistive solution, attached at each end thereof to an end plate, and about the circumference of each of the end plates, a corona reduction ring. Each of the resistor elements comprises an insulating tube having an electrode inserted into each end thereof and held in position by one or more hose clamps about the outer periphery of the insulating tube. According to a preferred embodiment, the electrode is fabricated from stainless steel and has a mushroom shape at one end, that inserted into the tube, and a flat end for engagement with the end plates that provides connection of the resistor array and with a load.

Lehmann, Monty Ray (Smithfield, VA)

2005-01-18T23:59:59.000Z

457

Demand-Side Load Scheduling Incentivized by Dynamic Energy Hadi Goudarzi, Safar Hatami, and Massoud Pedram  

E-Print Network (OSTI)

Demand-Side Load Scheduling Incentivized by Dynamic Energy Prices Hadi Goudarzi, Safar Hatami growth in electrical energy consumption under worst- case demand conditions [1]. To avoid expending 90089 {hgoudarz, shatami, pedram}@usc.edu Abstract--Demand response is an important part of the smart

Pedram, Massoud

458

TEC Working Group Topic Groups Rail Meeting Summaries | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rail Meeting Summaries Rail Meeting Summaries TEC Working Group Topic Groups Rail Meeting Summaries MEETING SUMMARIES Kansas City TEC Meeting, Rail Topic Group Summary - July 25, 2007 Atlanta TEC Meeting, Rail Topic Group Summary - March 6, 2007 Green Bay Meeting, Rail Topic Group Summary - October 26, 2006 Washington DC TEC Meeting, Rail Topic Group Summary - March 15, 2006 Pueblo TEC Meeting, Rail Topic Group Summary - September 22, 2005 Phoenix TEC Meeting, Rail Topic Group Summary - April 4, 2005 Minneapolis TEC Meeting, Rail Topic Group Summary - September 21, 2004 Albuquerque TEC Meeting, Rail Topic Group Summary - April 22, 2004 New Orleans TEC Meeting, Rail Topic Group Summary - January 29, 2002 Jacksonville TEC Meeting, Rail Topic Group Summary - January 20, 1999 Milwaukee TEC Meeting, Rail Topic Group Summary - July 13, 1998

459

Last Updated 8/12/2013 Page 1 of 2 Meeting Room 2 Meeting Room 3 Meeting Room 4 Meeting Room 5 Meeting Room 6  

E-Print Network (OSTI)

Cities Light Rail Monitoring Bioretention and Rainwater Harvesting Systems Urban Trees as a LID Source Meeting Room 6 8:00 a.m.-12:00 noon Intro to LID Rainwater Harvesting 1:00-5:00 p.m. Advances in Design for CSO Communities LID Research Panel Urban Trees and Stormwater Management LID Education Approaches

Minnesota, University of

460

Methods for Analyzing Electric Load Shape and its Variability  

E-Print Network (OSTI)

graphical displays of load data. We then define someAlthough simply overlaying load data from different timeprovide a good fit to load data in most buildings; their

Price, Philip

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Meeting Federal Energy Security Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Markel Markel SRA International Lawrence_Markel@sra.com Federal Utility Partnership Working Group Fall 2012 - October 16-17 Mobile, AL Sponsored by Alabama Power Theme Meeting energy security requirements in federal facilities provides opportunities for additional types of cooperation between utilities and the federal agencies. However, there are significant barriers to pursuing these opportunities - constraints on utilities and on federal agencies, as well as sometimes-competing objectives. Energy security encompasses sufficiency, surety, and sustainability.  Above all, energy security means having adequate power to conduct critical operations for the duration required (sufficiency).  Secondarily, and leading to sufficiency, is ensuring resilient energy supplies that are accessible when

462

Recapitalizing EMSL: Meeting Future Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Recapitalizing EMSL: Recapitalizing EMSL: Meeting Future Science and Technology Challenges Environmental Molecular Sciences Laboratory 2008 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

463

Tier 2 Vintage Rate Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

4 Tier 2 Rate Alternatives Tier 2 Rate Alternatives Load Growth Rate BPA commits to meet Load Following customers' load growth placed on BPA for the term of the commitment period...

464

Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California  

E-Print Network (OSTI)

electric  interval  load  data  are  available  through details,  each uses electric load data from a period before using  customer  load  data  [KEMA  2003,  Quantum  2004, 

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

2008-01-01T23:59:59.000Z

465

FEMA Think Tank Call Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

FEMA Think Tank Call Meeting FEMA Think Tank Call Meeting Minimize Date: Wednesday, September 25, 2013 Time: 1:00 - 2:30 p.m. (Eastern Time) Location: Y-12 New Hope Center, 602 Scarboro Rd, Oak Ridge, TN 37830 Overview Description: The FEMA Think Tank is a mechanism to formally collect, discuss, evaluate, and develop innovative ideas in the emergency management community - state, local, and tribal governments, as well as members of the public, including the private sector, the disability community, and volunteer groups. It ensures whole community partners and federal employees are motivated and encouraged to innovate, actively solicit and discuss ideas, and oversee the implementation of promising ideas. The FEMA Think Tank is designed to act as a forum where good ideas are shared, discussed, and become innovative solutions. There are currently two components to the think tank. The first, an online component, can be accessed at any time at, http://fema.ideascale.com. The second component is a conference call that includes both a nationwide telephone audience and an audience at the FEMA Think Tank Call site. This second component is described in more detail at the following website: http://www.fema.gov/fema-think-tank.

466

ARM - 2006 Science Team Meeting Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations Presentations 2006 Meeting 2006 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Posters Presentations Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 2006 Science Team Meeting Presentations Monday, March 27, 2006 ARM Orientation for New and Current PIs: Overview and History Warren Wiscombe (PDF, 6 MB) ARM Orientation for New and Current PIs: Infrastructure Overview 2006 Jimmy Voyles (PDF, 4MB) ARM Orientation for New and Current PIs: An Incomplete Introduction to ACRF Instrumentation Jim Liljegren (PDF, 4MB) ARM Orientation for New and Current PIs: ARM Data Quality Office - Real-Time Assessment of ARM Data Randy Peppler (PDF, 12MB) ARM Orientation for New and Current PIs: Getting Data from the ARM Archive

467

ARM - 2009 Science Team Meeting Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations Presentations 2009 Meeting 2009 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Posters Presentations Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 2009 Science Team Meeting Presentations Monday, March 30, 2009 ARM Orientation for New and Current PIs Chief Scientist's Perspective (PDF, 3,362K) Warren Wiscombe ARM Instruments (PDF, 1,828K) Jimmy Voyles Infrastructure (PDF, 607K) Jim Mather How to Get Data (PDF, 9,307) Raymond McCord Working Group Sessions Radiative Properties Working Group 2009 Breakout Session Agenda (PDF, 36K) Dave Turner Radiative Constraints in Tropical Upper Troposphere and Lower Stratosphere (PDF, 281K) Qiang Fu Ground-Based Microwave Cloud Tomography Experiment (PDF, 597K) Dong Huang

468

Chairs Meeting - June 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2011 June 2011 Chairs Meeting - June 2011 Environmental Management Site-Specific Advisory Board Chairs Meeting June 15 and 16, 2011 Aliante Station 7300 Aliante Parkway North Las Vegas, Nevada 89084 Documents Available for Download Meeting Agenda EM Program Update by Shirley J. Olinger Top Three Topics and Achievements by Site EM Budget Update by Joann Luczak Waste Materials and Disposition Update by Shirley J. Olinger Federal Advisory Committee Act and EM SSAB Membership by Cate Alexander Brennan Groundwater Update by Mark Williamson for Kurt Gerdes Advanced Simulation Capability for EM by Paul Dixon and Mark Williamson Meeting Summary More Documents & Publications Chairs Meeting - October 2011 2012 Congressional Nuclear Cleanup Caucus Briefings Chairs Meeting - October 2012

469

GC GUIDANCE ON MEETINGS WITH UNION OFFICIALS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEETINGS WITH UNION OFFICIALS MEETINGS WITH UNION OFFICIALS Department officials often receive requests to meet with officials of labor unions whose members are employees of Department contractors. Department officials should feel free to meet with such union officials subject to this guidance. Department officials must take care, however, not to insert themselves or the government inappropriately into the relationship between the unions and the contractors Sometimes unions will wish to meet with Department officials simply to learn about publicly stated Department plans or to make the Department aware of union concerns regarding a DOE policy applicable to contractors on a complex-wide basis. Department officials also may find it useful to initiate meetings with union officials to hear about

470

Code Compliance Technical Meeting: Building Technologies Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Compliance Technical Meeting: Building Technologies Office Department of Energy Washington, DC APRIL 2013 1 Welcome Welcome to The Building Technologies Office's Code Compliance Technical Meeting and to Washington, DC. On behalf of the Department of Energy Building Technology Office (BTO), we would like to thank you for attending, for your participation. The goal of this meeting is to review and discuss ongoing projects and existing activities that improve compliance with model energy codes. DOE

471

2013 Building America Research Planning Meeting Summary  

SciTech Connect

The Building America (BA) Research Planning Meeting was held October 28-30, 2013, in Washington, DC. This meeting provides one opportunity each year for the research teams, national laboratories and Department of Energy (DOE) managers to meet in person to share the most pertinent information and collaboration updates. This report documents the presentations, highlights key program updates, and outlines next steps for the program.

Metzger, C. E.; Hunt, S.

2014-02-01T23:59:59.000Z

472

TEC Working Group Topic Groups Tribal Meeting Summaries | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Summaries Meeting Summaries TEC Working Group Topic Groups Tribal Meeting Summaries Meeting Summaries Kansas City TEC Meeting - Tribal Group Summary - July 25, 2007 Atlanta TEC Meeting - Tribal Group Summary - March 6, 2007 Green Bay TEC Meeting -- Tribal Group Summary - October 26, 2006 Washington TEC Meeting - Tribal Topic Group Summary - March 14, 2006 Pueblo TEC Meeting - Tribal Topic Group Summary, September 22, 2005 Phoenix TEC Meeting - Tribal Topic Group Summary - April 4, 2005 Albuquerque TEC Meeting - Tribal Topic Group Presentation - April 21, 2004 New Orleans TEC Meeting - Tribal Topic Group Summary - January 29, 2002 Portland TEC Meeting, Tribal Topic Group Summary - February 6, 2001 Philadelphia TEC Meeting, Tribal Topic Group Summary - July 13, 1999

473

Meetings | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Meetings Meetings Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Meetings Print Text Size: A A A RSS Feeds FeedbackShare Page Currently Scheduled NSAC Meetings There are currently no NSAC meetings scheduled. Please check back, future meetings will be posted here. Past Meetings | Minutes Meeting December 19, 2013 | Minutes | Webcast External link Meeting March 8-9, 2013 | Minutes .pdf file (222KB) | Webcast External link Meeting January 28-29, 2013 | Minutes .pdf file (201KB) | Webcast External link Meeting September 21, 2012 | Minutes .pdf file (387KB) | Webcast External link Meeting March 9, 2012 | Minutes .pdf file (1.3MB) | Webcast External link Meeting December 1, 2011 | Minutes .pdf file (239KB)

474

Reservoir compaction loads on casings and liners  

SciTech Connect

Pressure drawdown due to production from a reservoir causes compaction of the reservoir formation which induces axial and radial loads on the wellbore. Reservoir compaction loads increase during the production life of a well, and are greater for deviated wells. Presented here are casing and liner loads at initial and final pressure drawdowns for a particular reservoir and at well deviation angles of 0 to 45 degrees.

Wooley, G.R.; Prachner, W.

1984-09-01T23:59:59.000Z

475

Expert Meeting Report: Exploring the Disconnect Between Rated and Field  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exploring the Disconnect Between Rated and Exploring the Disconnect Between Rated and Field Performance of Water Heating Systems Expert Meeting Report: Exploring the Disconnect Between Rated and Field Performance of Water Heating Systems Water heating represents a major residential energy end use, especially in highly efficient homes where space conditioning loads and energy use has been significantly reduced. Future efforts to reduce water heating energy use requires the development of an improved understanding of equipment performance, as well as recognizing system interactions related to the distribution system and the fixture use characteristics. By bringing together a group of water heating experts, we hope to advance the shared knowledge on key water heating performance issues and identify additional

476

Health, Safety and Environmental Protection Committee Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Transcribed Flipcharts May 9, 2013 Upcoming Safety Culture Discussion Topics 1. DNFSB (Report to... May) 2. Updating SC Improv. Plan (June) 3. HSS Report 4. Bechtel...

477

Microsoft PowerPoint - Customer meeting 20140605  

NLE Websites -- All DOE Office Websites (Extended Search)

B d District management of the District hydropower Prioritization of budgeted work * Individual District Commanders Remain R ibl Board hydropower program Meeting...

478

ORSSAB Meeting - April 2014 | Department of Energy  

Office of Environmental Management (EM)

Advisory Board meeting agenda, minutes, and materials. "Development of a Comprehensive Mercury Strategy for the Oak Ridge Reservation," Laura Wilkerson, DOE April ORSSAB agenda.pdf...

479

Meetings of Affiliated Scientific Societies in America  

Science Journals Connector (OSTI)

... AN important series of scientific meetings was held at Philadelphia, December 26–28, under the leadership of the American Society of Naturalists, and including six other ...

1896-01-30T23:59:59.000Z

480

UDAC Meeting - September 2009 | Department of Energy  

Office of Environmental Management (EM)

Meeting Agenda UDAC Committee Business Overview of the Draft 2010 Annual Plan Technology Transfer: Demonstration of the Knowledge Management Database Benefits Assessment Project...

Note: This page contains sample records for the topic "meet load growth" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

URTAC Meeting - September 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting agenda URTAC Committee Business Overview of the Draft 2010 Annual Plan Technology Transfer: Demonstration of the Knowledge Management Database Overview of RPSEA's...

482

December 3, 2013 SEAB Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE))

This is a brief summary of the December 3, 2013 meeting of the Secretary of Energy Advisory Board held at Lawrence Livermore National Lab.

483

ORSSAB monthly board meeting | Department of Energy  

Energy Savers (EERE)

will hear a presentation and updates about "Sufficient Waste Disposal Capacity on the Oak Ridge Reservation." The meeting is open to the public. Location: DOE Information...

484

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network (OSTI)

Ad Hoc Assessment Committee Meeting Notes January 17, 2008 Present: Diane Armpriest bag session (thresholds for data). The agenda item for the next ad hoc assessment committee

O'Laughlin, Jay

485

NIF and Jupiter User Group Meeting 2014  

NLE Websites -- All DOE Office Websites (Extended Search)

will be held Sunday, February 9 through Wednesday, February 12, 2014 at the Lawrence Livermore National Laboratory. The meeting will describe NIF and JLF's capabilities to current...

486

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

A.A., and Emilenko, A.S., A.M. Obukhov Institute of Atmospheric Physics RAS, Moscow, Russia Thirteenth Atmospheric Radiation Measurement (ARM) Science Team Meeting Regular...

487

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Measurement (ARM) Science Team Meeting The Unmanned Aerospace Vehicle (UAV) Program conducted an ARM Enhanced Shortwave Experiment (ARESE) II Intensive...

488

Chairs Meeting - October 2011 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2011 ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD CHAIRS MEETING Public Video Teleconference Hosted by the U.S. Department of Energy 1000 Independence Avenue, SW -...

489

Kickoff Meeting for New Fuel Cell Projects  

Energy.gov (U.S. Department of Energy (DOE))

This presentation by Reg Tyler of the DOE Golden Field Office was given at a meeting on new fuel cell projects in February 2007.

490

Secretary of Energy Advisory Board Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Arun Majumdar, Acting Under Secretary for Energy; Victor Reis, Office of Science; John Kelly, Office of Nuclear Energy Meeting Summary SEAB members heard opening remarks from...

491

UDAC Meeting - September 2013 | Department of Energy  

Office of Environmental Management (EM)

September 17, 2013 Presentations from the WebEx meeting Ultra-Deepwater Risk Assessment NETL ORD's EPAct Complementary Research RPSEA Administered Cost Share Research Overview...

492

UDAC Meeting - July 2009 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Meeting Agenda Status Update of Section 999 UDAC Research Program Status Update of NETL Complementary Research Program Status Update of UDAC Cost-Shared Program Status Update...

493

URTAC Meeting - July 2009 | Department of Energy  

Office of Environmental Management (EM)

Meeting agenda Status Update of Section 999 URTAC Research Program Status Update of NETL Complementary Research Program Status Update of URTAC Cost-Shared Program Status Update...

494

Building America Research Planning Meeting: November 2010  

Energy.gov (U.S. Department of Energy (DOE))

On this page, you may link to the summary report and presentations for the Building America Planning meeting in November 2010, held in Washington, D.C.

495

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

A High-Altitude Cloud Climatology From Satellite Data Hobbs, R. and Rusk, D.J., Aeromet, Inc. Thirteenth Atmospheric Radiation Measurement (ARM) Science Team Meeting Tenuous,...

496

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting We apply data obtained from the FIRE's (First International Satellite Cloud Climatology Project ISCCP Regional Experiment's) Atlantic Stratocumulus Transition Experiment...

497

EMAB Meeting - June 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2013 EMAB Meeting - June 2013 ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Double Tree by Hilton Hotel Augusta 2651 Perimeter Parkway, Augusta, Georgia 30909 Richmond I&III...

498

Identifying Green Meetings in the Hospitality Industry.  

E-Print Network (OSTI)

??Purpose: The purpose of this paper is to identify what constitutes green meetings in the hospitality industries with special attentions on the applications of modern… (more)

Chiou, Shin Yi (Felicity)

2011-01-01T23:59:59.000Z

499

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Meteorological Operations Rusk, D.J., Aeromet, Inc. Thirteenth Atmospheric Radiation Measurement (ARM) Science Team Meeting It is highly desirable to use cloud radar data in...

500

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Continued Evaluation of the Microwave Radiometer Profiler Liljegren, J.C., Argonne National Laboratory Twelfth Atmospheric Radiation Measurement (ARM) Science Team Meeting Final...