Powered by Deep Web Technologies
Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Best Management Practice #12: Laboratory and Medical Equipment...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

water for the following load. Install a water recycling system for glassware washer wastewater. Vivarium Equipment Replace older inefficient cage and rack washers with more...

2

Best Management Practice #12: Laboratory and Medical Equipment  

Broader source: Energy.gov [DOE]

Equipment used in hospitals and laboratories can use significant amounts of water, but also offer the opportunity for substantial water savings by making a few small changes to how and when the...

3

Water Efficiency Improvements at Various Environmental Protection Agency Sites: Best Management Practice Case Study #12 - Laboratory/Medical Equipment (Brochure)  

SciTech Connect (OSTI)

The U.S. Environmental Protection Agency (EPA) built a successful water conservation program and reduced potable water use through a series of initiatives at EPA laboratories. The projects highlighted in this case study demonstrate EPA's ability to reduce water use in laboratory and medical equipment by implementing vacuum pump and steam sterilizer replacements and retrofits. Due to the success of the initial vacuum pump and steam sterilizer projects described here, EPA is implementing similar projects at several laboratories throughout the nation.

Blakley, H.

2011-03-01T23:59:59.000Z

4

Product development of a device for manufacturing medical equipment for use in low-resource settings  

E-Print Network [OSTI]

The objective of this paper is to describe the product design of a device that can be used to create medical supplies on-site in clinics in low-resource settings. The machine uses purely mechanical elements to cut and fold ...

Schlecht, Lisa (Lisa Anne)

2010-01-01T23:59:59.000Z

5

Phase II - Procurement of State of the Art Research Equipment to Support Faculty Members with the RNA Therapeutics Institute, a component of the Advanced Therapeutics Cluster at the University of Massachusetts Medical School  

SciTech Connect (OSTI)

This project supported the continued development of the RNA Therapeutics Institute at the UMass Medical School. This funding allows for the purchase of critical equipment that will enable faculty members to develop RNA technology in order to better understand the complexity that separates genome sequence from biological function, as well as to reduce the hyperactivity of harmful genes.

Moore, Melissa

2011-10-14T23:59:59.000Z

6

Needs of Non Energy-Focused Contractors  

SciTech Connect (OSTI)

To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

Liaukus, C.

2012-12-01T23:59:59.000Z

7

Therapeutic Hypothermia: Protective Cooling Using Medical Ice...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Therapeutic Hypothermia: Protective Cooling Using Medical Ice Slurry Technology available for licensing: Proprietary method and equipment for making an ice slurry coolant to induce...

8

Energy Audit Equipment  

E-Print Network [OSTI]

The tools (equipment) needed to perform an energy audit include those items which assist the auditor in measuring the energy used by equipment or lost in inefficiency. Each tool is designed for a specific measurement. They can be inexpensive simple...

Phillips, J.

2012-01-01T23:59:59.000Z

9

Renewable Energy Equipment Exemption  

Broader source: Energy.gov [DOE]

Iowa allow a sales tax exemption for solar, wind, and hydroelectricity equipment. As of May 2013, the Iowa sales tax rate is 6%.

10

E-Print Network 3.0 - ambulatory apparatus equipped Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Health and Safety facility at 50... Medical Center Way. 2. Why does UCSF need the cell phone antenna equipment installed? Cellular coverage Source: Derisi, Joseph -...

11

Solar Equipment Certification  

Broader source: Energy.gov [DOE]

Under the Solar Energy Standards Act of 1976, the Florida Solar Energy Center (FSEC) is responsible for certifying all solar equipment sold in Florida. A manufacturer who wishes to have their...

12

Laboratory Equipment Donation Program - Equipment Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&Dynamos ProfessorContact

13

Laboratory Equipment Donation Program - Equipment List  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&Dynamos

14

african medical staff: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to implement the Biology and Medicine Websites Summary: with you: keys, wallet, eyeglasses, medications, etc. Shut down critical equipment in the areaEvacuation Expectations...

15

Equipment Operational Requirements  

SciTech Connect (OSTI)

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

16

Winterizing Equipment Mulching Strawberries  

E-Print Network [OSTI]

equipment. Drain all water from lines, and follow manufacturer's recommen- dations on winterizing pumps. Mulching Strawberries: If you haven't already done so you should make arrangements for you mulch supply now weed or wheat seeds. Any straw is suitable as long as it is heavy enough to resist blowing off

Ginzel, Matthew

17

Emergency Facilities and Equipment  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume clarifies requirements of DOE O 151.1 to ensure that emergency facilities and equipment are considered as part of emergency management program and that activities conducted at these emergency facilities are fully integrated. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

18

Industrial Sector Energy Demand: Revisions for Non-Energy-Intensive Manufacturing (released in AEO2007)  

Reports and Publications (EIA)

For the industrial sector, the Energy Information Administration's (EIA) analysis and projection efforts generally have focused on the energy-intensive industriesfood, bulk chemicals, refining, glass, cement, steel, and aluminumwhere energy cost averages 4.8% of annual operating cost. Detailed process flows and energy intensity indicators have been developed for narrowly defined industry groups in the energy-intensive manufacturing sector. The non-energy-intensive manufacturing industries, where energy cost averages 1.9% of annual operating cost, previously have received somewhat less attention, however. In Annual Energy Outlook 2006 (AEO), energy demand projections were provided for two broadly aggregated industry groups in the non-energy-intensive manufacturing sector: metal-based durables and other non-energy-intensive. In the AEO2006 projections, the two groups accounted for more than 50% of the projected increase in industrial natural gas consumption from 2004 to 2030.

2007-01-01T23:59:59.000Z

19

Early Equipment Management  

E-Print Network [OSTI]

starting with the ones that could cause the most human harm. This is also an excellent time to discuss all the lockout/tagout points on the machine, determine how much safety training is necessary and if there are enough warning stickers. The idea... needed. One-point lessons should be completed on all inspection, lubrication, and lockout/tagout points. Equipment labels should be created at this time including lockout/tagout and predetermined set-points. The key to a successful EEM program...

Schlie, Michelle

2007-05-18T23:59:59.000Z

20

Equipment | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance EnvironmentalEnzymeEnzymeCr1stEquipmentPool

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Equipment | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance EnvironmentalEnzymeEnzymeCr1stEquipmentPoolPhilips

22

Healthcare Energy: Spotlight on Medical Equipment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThisThe HawaiiNRELAdditional plug

23

Best Management Practice #12: Laboratory and Medical Equipment | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd: ScopeDepartment ofEnergyBeowawe Binary TableBestof

24

Electrical Equipment Inventory and Inspection Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrical Equipment Inventory and Inspection Information APS Non-NRTL Electrical Equipment Inventory Spreadsheet ANL Recognized Reputable Electrical Equipment Manufacturer List as...

25

INL '@work' heavy equipment mechanic  

ScienceCinema (OSTI)

INL's Cad Christensen is a heavy equipment mechanic. For more information about INL careers, visit http://www.facebook.com/idahonationallaboratory.

Christensen, Cad

2013-05-28T23:59:59.000Z

26

Information technology equipment cooling system  

SciTech Connect (OSTI)

According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

Schultz, Mark D.

2014-06-10T23:59:59.000Z

27

EECBG Direct Equipment Purchase Air Conditioner Guide Equipment Type  

E-Print Network [OSTI]

EECBG Direct Equipment Purchase Air Conditioner Guide Equipment Type Size Category (Btu/h) Size.ahridirectory.org/ceedirectory/pages/ac/cee/defaultSearch.aspx 12,000 Btu/h = 1 ton Less than 65,000 Btu/h Air Conditioners, Air Cooled Air Conditioners, Water completed by the California Energy Commission at a rate of 12,000 Btu/h per ton of air conditioning Source

28

TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS  

SciTech Connect (OSTI)

The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive.

NA

1997-09-29T23:59:59.000Z

29

Commonwealth's Master Equipment Leasing Program  

Broader source: Energy.gov [DOE]

The [http://www.trs.virginia.gov/debt/MELP%20Guides.aspx Master Equipment Leasing Program] (MELP) ensures that all Commonwealth agencies, authorities and institutions obtain consistent and...

30

Wind Measurement Equipment: Registration (Nebraska)  

Broader source: Energy.gov [DOE]

All wind measurement equipment associated with the development or study of wind-powered electric generation, whether owned or leased, shall be registered with the Department of Aeronautics if the...

31

Medical Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubey MathematicaMeasuringMedical Plans Medical Plans

32

VEHICLES, MACHINERY AND EQUIPMENT Table Of Contents  

E-Print Network [OSTI]

of a license/permit for each piece of equipment, an Operator Equipment Qualification Record (DA Form 348EM 385-1-1 XX Sep 13 i Section 18 VEHICLES, MACHINERY AND EQUIPMENT Table Of Contents Section: Page...................................................................18-16 18.G Machinery And Mechanized Equipment.........................18-16 18.H Drilling Equipment

US Army Corps of Engineers

33

Best Management Practice #11: Commercial Kitchen Equipment  

Broader source: Energy.gov [DOE]

Commercial kitchen equipment represents a large set of water users in the non-residential sector. Water efficiency for commercial kitchen equipment is especially important because high volume...

34

Materials Selection Considerations for Thermal Process Equipment...  

Broader source: Energy.gov (indexed) [DOE]

Materials Selection Considerations for Thermal Process Equipment: A BestPractices Process Heating Technical Brief Materials Selection Considerations for Thermal Process Equipment:...

35

Summary of Construction Equipment Tests and Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Construction Equipment Tests and Activities Bruce Glagola - Sept 2013 Construction Equipment Tests A series of tests were conducted by the APS Construction Vibration...

36

Columbia University Medical Center Environmental Health & Safety  

E-Print Network [OSTI]

of radioactive materials. §175.104 Waste disposal. §175.105 Transportation of radioactive materials. Microwave of radiation equipment. #12;Radioactive Materials §175.101 General requirements for radioactive materials licenses. §175.102 Requirements for specific types of radioactive materials licenses. §175.103 Medical use

Grishok, Alla

37

Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance EnvironmentalEnzymeEnzymeCr1st

38

Heating and Cooling Equipment Selection  

SciTech Connect (OSTI)

This is one of a series of technology fact sheets created to help housing designers and builders adopt a whole-house design approach and energy efficient design practices. The fact sheet helps people choose the correct equipment for heating and cooling to reduce initial costs, increase homeowner comfort, increase operating efficiency, and greatly reduce utility costs.

Not Available

2002-01-01T23:59:59.000Z

39

Covered Product Category: Imaging Equipment  

Broader source: Energy.gov [DOE]

FEMP provides acquisition guidance and Federal efficiency requirements across a variety of product categories, including imaging equipment, which is covered by the ENERGY STAR program. Federal laws and requirements mandate that agencies meet these efficiency requirements in all procurement and acquisition actions that are not specifically exempted by law.

40

COLD STORAGE DESIGN REFRIGERATION EQUIPMENT  

E-Print Network [OSTI]

COLD STORAGE DESIGN AND REFRIGERATION EQUIPMENT REFRIGERATION OF FISH - PART 1 \\ "..\\- ,,, T I (Section 1), and F. Bruce Sanford (Section 1) Table of Contents Pages Section 1 - Cold Storage Design to be Considered in the Freezing and Cold Storage of Fishery Products - Preparing, Freezing, and Cold Storage

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Modern refining and petrochemical equipment  

SciTech Connect (OSTI)

Petroleum refining and petroleum chemistry are characterized by a whole set of manufacturing processes and methods, whose application depends on the initial raw material and the final products. Therefore, refining and petrochemical equipment has many different operational principles, design solutions, and materials. The activities of the Russian Petroleum Industry are discussed.

Pugach, V.V.

1995-07-01T23:59:59.000Z

42

Medical Messages  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007Naval Reactors'InformationSOLAR MARKET0Department25/11Medical

43

AIJ in the Non-Energy Sector in India: Opportunities and Concerns  

SciTech Connect (OSTI)

Although the U.N. Framework Convention on Climate Change (FCCC) has been signed and ratified by 168 countries, global greenhouse gas (GHG) emissions have increased substantially since the 1992 Rio Summit. In both developing countries (DCs) and industrialized countries (ICs), there has been a need to find mechanisms to facilitate environmentally sound mitigation strategies. This need led to the formation of Activities Implemented Jointly (AIJ) at the first Conference-of the Parties (COP) in 1995. In Article 4A, para 2D, the COP established an AIJ pilot phase in which Annex I (IC) countries would enter into agreements to implement activities jointly with non-Annex I parties. DCs would engage in AIJ on a purely voluntary basis and all AIJ projects should be compatible with and supportive of national environment and development goals. AIJ does not imply GHG reduction commitments by DCs. Neither do all projects undertaken during the pilot phase qualify as a fulfillment of current commitment s of Annex I parties under the COP. The current pilot phase for AIJ ends in the year 2000, a date which may be extended. Current AIJ activities are largely focused on the energy sector. The Nordic countries, for example, feel that the most important potential areas for cooperation in AIJ are fuel conversion, more effective energy production, increased energy efficiency, and reforms in energy-intensive industry (Nordic Council of Ministers, 1995). Denmark does not want to include non-energy sector projects such as carbon sink enhancement projects in the pilot phase (Nordic Council of Ministers, 1995). However, other countries, including the US, have already funded a number of forestry sector projects (Development Alternatives, 1997). Moreover, energy-sector projects involving high technology or capital-intensive technology are often a source of controversy between DCs and ICs regarding the kind of technology transferred and sharing of costs and benefits. Further, the pilot phase provide s an opportunity for capacity-building and learning about methods of planning, implementation, and monitoring of GHG abatement in land-based non-energy sector projects.

Ravindranath, N.H.; Meili, A.; Anita, R.

1998-11-01T23:59:59.000Z

44

Medical Radioisotope | Nuclear Science | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping the NanoscaleMechanical BehaviorSummerwelcomeMedical Radioisotope

45

Medical Surveillance | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping the NanoscaleMechanical BehaviorSummerwelcomeMedical

46

Strategy Guideline: HVAC Equipment Sizing  

SciTech Connect (OSTI)

The heating, ventilation, and air conditioning (HVAC) system is arguably the most complex system installed in a house and is a substantial component of the total house energy use. A right-sized HVAC system will provide the desired occupant comfort and will run efficiently. This Strategy Guideline discusses the information needed to initially select the equipment for a properly designed HVAC system. Right-sizing of an HVAC system involves the selection of equipment and the design of the air distribution system to meet the accurate predicted heating and cooling loads of the house. Right-sizing the HVAC system begins with an accurate understanding of the heating and cooling loads on a space; however, a full HVAC design involves more than just the load estimate calculation - the load calculation is the first step of the iterative HVAC design procedure. This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, Florida. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

Burdick, A.

2012-02-01T23:59:59.000Z

47

Equipment Inventory | Sample Preparation Laboratories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance EnvironmentalEnzymeEnzymeCr1stEquipment Inventory

48

Equipment Listing | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance EnvironmentalEnzymeEnzymeCr1stEquipment Inventory

49

Equipment Loans | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance EnvironmentalEnzymeEnzymeCr1stEquipment

50

Equipment Pool | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance EnvironmentalEnzymeEnzymeCr1stEquipmentPool What

51

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

52

Machinery and Equipment Expensing Deduction (Kansas)  

Broader source: Energy.gov [DOE]

Machinery and Equipment Expensing Deduction allows Kansas taxpayers to claim an expense deduction for business machinery and equipment, placed in service in Kansas during the tax year. The one-time...

53

Medical Device Reliability BIOMATERIALS  

E-Print Network [OSTI]

NEMI Medical Electronics team to address short- and long-term reliability issues with medical devices. OurMedical Device Reliability BIOMATERIALS Our goal is to provide medical device manufacturers, and consistency of active implantable medical devices. These devices, including pacemakers, cardiac defibrillators

54

Better Buildings Alliance Equipment Performance Specifications...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Better Buildings Alliance Equipment Performance Specifications - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building Technologies Office's...

55

Proceedings: Tenth EPRI Substation Equipment Diagnostics Conference  

SciTech Connect (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The tenth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2002-06-01T23:59:59.000Z

56

Proceedings: Substation Equipment Diagnostics Conference IX  

SciTech Connect (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The ninth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2001-09-01T23:59:59.000Z

57

After-hours power status of office equipment and energy use of miscellaneous plug-load equipment  

SciTech Connect (OSTI)

This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of miscellaneous plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. For most types of miscellaneous equipment, we also estimated typical unit energy consumption in order to estimate total energy consumption of the miscellaneous devices within our sample. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from sixteen commercial buildings in California, Georgia, and Pennsylvania: four education buildings, two medical buildings, two large offices (> 500 employees each), three medium offices (50-500 employees each), and five small business offices (< 50 employees each). Two buildings are in the San Francisco Bay are a of California, nine (including the five small businesses) are in Pittsburgh, Pennsylvania, and five are in Atlanta, Georgia.

Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Marageret J.; Busch, John F.

2004-05-27T23:59:59.000Z

58

Medical Aspects of Reliability  

SciTech Connect (OSTI)

This presentation covers the medical evaluation as part of a human reliability program, particularly the various medical qualifications and potential disqualifiers.

Atencio, Julian J.

2014-05-05T23:59:59.000Z

59

Changing nature of equipment and parts qualification  

SciTech Connect (OSTI)

Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace.

Bucci, R.M.

1988-01-01T23:59:59.000Z

60

Sandia National Laboratories: Earth Science: Facilities and Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ManagementEarth ScienceEarth Science: Facilities and Equipment Earth Science: Facilities and Equipment Geoscience Facilities and Equipment High-pressure thermalmechanical...

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Medical Management Treatment Manual  

E-Print Network [OSTI]

Medical Management Treatment Manual: A Clinical Guide for Researchers and Clinicians) This manual is an adaptation of: Medical Management Treatment Manual: A Clinical Research Guide for Medically, Maryland #12;Message to the Users of this Medical Management (MM) Manual from the Editors Background

Bezrukov, Sergey M.

62

Report to the IET regarding the registration of Medical Engineers October 2006 Report on the professional registration of engineers maintaining and servicing  

E-Print Network [OSTI]

on the professional registration of engineers maintaining and servicing medical equipment within the healthcare and servicing of medical devices. In this document the term `medical engineer' is used to describe a worker who, development manufacture, servicing, maintenance and management of these devices. Medical engineers

Haylett, Kevin R.

63

Pollution Control Equipment Tax Deduction (Alabama)  

Broader source: Energy.gov [DOE]

The Pollution Control Equipment Tax Deduction allows businesses to deduct from their Alabama net worth the net amount invested in all devices, facilities, or structures, and all identifiable...

64

Process Equipment Cost Estimation, Final Report  

SciTech Connect (OSTI)

This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

H.P. Loh; Jennifer Lyons; Charles W. White, III

2002-01-01T23:59:59.000Z

65

G129 S129 Equipment List Windbreaker  

E-Print Network [OSTI]

(optional) Water shoes (tevas or old tennis shoes) Gaitors (optional) COURSE EQUIPMENT*: Pocket or wrist operated) Bug Spray Deck of cards, musical instrument, Frisbee, etc (optional) * Textbooks should

Polly, David

66

assemblies equipment: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capital equipment manufacturing plant : component level and assembly level inventory management MIT - DSpace Summary: Semiconductor capital equipment is manufactured in...

67

Electrical Equipment Inspection Program Electrical Safety  

E-Print Network [OSTI]

Electrical Equipment Inspection Program Electrical Safety SLAC-I-730-0A11A-001-R003 23 March 2005 Document Title: Electrical Equipment Inspection Program Original Publication Date: 19 January 2005 Revised Publication Date: 23 March 2005 (updated 29 November 2010) Department: Electrical Safety Document Number: SLAC

Wechsler, Risa H.

68

General Restaurant Equipment: Order (2013-CE-5344)  

Broader source: Energy.gov [DOE]

DOE ordered General Restaurant Equipment Co. to pay a $8,000 civil penalty after finding General Restaurant Equipment had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

69

Automatic monitoring of vibration welding equipment  

DOE Patents [OSTI]

A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

2014-10-14T23:59:59.000Z

70

Universal null DTE (data terminal equipment)  

DOE Patents [OSTI]

A communication device in the form of data terminal equipment permits two data communication equipments, each having its own master clock and operating at substantially the same nominal clock rate, to communicate with each other in a multi-segment circuit configuration of a general communication network even when phase or frequency errors exist between the two clocks. Data transmitted between communication equipments of two segments of the communication network is buffered. A variable buffer fill circuit is provided to fill the buffer to a selectable extent prior to initiation of data output clocking. Selection switches are provided to select the degree of buffer preload. A dynamic buffer fill circuit may be incorporated for automatically selecting the buffer fill level as a function of the difference in clock frequencies of the two equipments. Controllable alarm circuitry is provided for selectively generating an underflow or an overflow alarm to one or both of the communicating equipments. 5 figs.

George, M.; Pierson, L.G.; Wilkins, M.E.

1987-11-09T23:59:59.000Z

71

Emergency Medical Support  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume defines coordination between emergency planners and emergency medical support. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

72

University of California, Davis, Health System Office of Medical Education  

E-Print Network [OSTI]

University of California, Davis, Health System Office of Medical Education Exhibitor Confirmation' tabletop or equivalent floor space. o Vendors provide their own electrical cords or pay for equipment provided by conference site AV services. o Decorating, security guard, internet and electricity

Leistikow, Bruce N.

73

Microfluidic Facility, Harvard Medical School LIQUID NITROGEN TANK HANDLING  

E-Print Network [OSTI]

Microfluidic Facility, Harvard Medical School LIQUID NITROGEN TANK HANDLING HMS microfluidics/microfabrication facility has one high pressure liquid nitrogen tank which supplies the nitrogen for some equipment normal operation. In case the liquid nitrogen tank is malfunctioning and requires to be shut down or replaced make

Paulsson, Johan

74

Incidents of chemical reactions in cell equipment  

SciTech Connect (OSTI)

Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

1991-12-31T23:59:59.000Z

75

An Approach to Evaluating Equipment Efficiency Policies  

E-Print Network [OSTI]

The National Energy Conservation Policy Act of 1978 authorized studies of several types of industrial equipment to evaluate the technical and economic feasibility of labeling rules and minimum energy efficiency standards. An approach...

Newsom, D. E.; Evans, A. R.

1980-01-01T23:59:59.000Z

76

Hot conditioning equipment conceptual design report  

SciTech Connect (OSTI)

This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

Bradshaw, F.W., Westinghouse Hanford

1996-08-06T23:59:59.000Z

77

Industrial Equipment Demand and Duty Factors  

E-Print Network [OSTI]

Demand and duty factors have been measured for selected equipment (air compressors, electric furnaces, injection molding machines, centrifugal loads, and others) in industrial plants. Demand factors for heavily loaded air compressors were near 100...

Dooley, E. S.; Heffington, W. M.

78

Safety Topic: Rota/ng Equipment  

E-Print Network [OSTI]

Safety Topic: Rota/ng Equipment Jus/n Kleingartner #12;Safety protocols 2 #12;Safety protocols for opera/ng a lathe · Don'ts: ­ Do not wear gloves

Cohen, Robert E.

79

Renewable Energy Equipment Sales Tax Exemption  

Broader source: Energy.gov [DOE]

Massachusetts law exempts from the state's sales tax "equipment directly relating to any solar, windpowered; or heat pump system, which is being utilized as a primary or auxiliary power system for...

80

Clark Public Utilities- Solar Energy Equipment Loan  

Broader source: Energy.gov [DOE]

Clark Public Utilities offers financing available to its customers for the purchase and installation of residential solar equipment. Loans up to $10,000 are available for solar pool heaters and...

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Solar and Wind Energy Equipment Exemption  

Broader source: Energy.gov [DOE]

In Wisconsin, any value added by a solar-energy system or a wind-energy system is exempt from general property taxes. A solar-energy system is defined as "equipment which directly converts and then...

82

Heavy Mobile Equipment Mechanic (One Mechanic Shop)  

Broader source: Energy.gov [DOE]

The position is a Heavy Mobile Equipment Mechanic (One Mechanic Shop) located in Kent, Washington, and will be responsible for the safe and efficient operation of a field garage performing...

83

Biomass Equipment and Materials Compensating Tax Deduction  

Broader source: Energy.gov [DOE]

In 2005 New Mexico adopted a policy to allow businesses to deduct the value of biomass equipment and biomass materials used for the processing of biopower, biofuels or biobased products in...

84

Consider Steam Turbine Drives for Rotating Equipment  

SciTech Connect (OSTI)

This revised ITP tip sheet on steam turbine drives for rotating equipment provides how-to advice for improving the system using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

85

Dairy Manure Handling Systems and Equipment.  

E-Print Network [OSTI]

The Texas A&M University System ? Texas Agricultural Extension Service Zerle L. Carpenter, Director College Station 8?1446 DAIRY MANURE HANDLING SYSTEMS AND EQUIPMENT DAIRY MANURE HANDLING SYSTEMS AND EQUIPMENT John M. Sweeten, Ph....D., P.E.* A manure management system for a modern dairy should be capable of controlling solid or liquid manure and wastewater from the open corrals (manure and rainfall runoff), free stall barn , feeding barn , holding lot or holding shed , milking...

Sweeten, John M.

1983-01-01T23:59:59.000Z

86

Experience gained from equipment qualification inspections  

SciTech Connect (OSTI)

This paper describes issues which have been identified during equipment qualification inspections. Generic qualification information is discussed first, such as qualification bases, utility/supplier interfaces, file auditability, and generic environmental qualification. Next, technical strategies with specific examples are discussed. Issues covered include functional performance requirements, post accident qualification, similarity, installation and interfaces, maintenance, aging, and testing. Finally, additions and deletions to equipment qualification master lists and environmental enveloping are discussed.

Jacobus, M.J.

1986-01-01T23:59:59.000Z

87

Electricity Used by Office Equipment and Network Equipment in the U.S.: Detailed Report and Appendices  

E-Print Network [OSTI]

LBNL-45917 Electricity Used by Office Equipment and Network Equipment in the U.S.: Detailed Report..............................................................................................46 #12;#12;1 Electricity Used by Office Equipment and Network Equipment in the U.S. Kaoru Kawamoto and network equipment, there has been no recent study that estimates in detail how much electricity

88

1982 analyses and reports: equipment availability report; component cause code report; and equipment availability report  

SciTech Connect (OSTI)

This equipment availability report (1973 to 1982, 1982) presents statistical information on the performance of the major types of generating units and their major component groups. (DLC)

Not Available

1982-01-01T23:59:59.000Z

89

michael smith ornlradioactive beams: equipment & techniques recoil separators  

E-Print Network [OSTI]

michael smith ornlradioactive beams: equipment & techniques recoil separators approach! · directly Smith, Rolfs, Barnes NIMA306 (1991) 233 #12;michael smith ornlradioactive beams: equipment & techniques;michael smith ornlradioactive beams: equipment & techniques recoil separators proof of concept with 12C

90

Abatement of Air Pollution: Air Pollution Control Equipment and...  

Broader source: Energy.gov (indexed) [DOE]

contain instructions for the operation and monitoring of air pollution control equipment, as well as comments on procedures in the event of equipment breakdown, failure, and...

91

Data Center Efficiency and IT Equipment Reliability at Wider...  

Broader source: Energy.gov (indexed) [DOE]

Center Efficiency and IT Equipment Reliability at Wider Operating Temperature and Humidity Ranges Data Center Efficiency and IT Equipment Reliability at Wider Operating Temperature...

92

Southwest Gas Corporation- Commercial Energy Efficient Equipment Rebate Program  

Broader source: Energy.gov [DOE]

Southwest Gas Corporation (SWG) offers rebates to commercial customers in Nevada who purchase energy efficient natural gas equipment. Eligible equipment includes clothes washers, storage water...

93

Southwest Gas Corporation- Commercial High-Efficiency Equipment Rebate Program  

Broader source: Energy.gov [DOE]

Southwest Gas Corporation (SWG) offers rebates to commercial customers in Arizona who purchase energy efficient natural gas equipment. Eligible equipment includes natural gas storage and tankless...

94

Novel Energy Conversion Equipment for Low Temperature Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Novel Energy Conversion Equipment for Low Temperature Geothermal Resources Project objective: Develop...

95

Security Equipment and Systems Certification Program (SESCP)  

SciTech Connect (OSTI)

Sandia National Laboratories (SNL) and Underwriters Laboratories, Inc., (UL) have jointly established the Security Equipment and Systems Certification Program (SESCP). The goal of this program is to enhance industrial and national security by providing a nationally recognized method for making informed selection and use decisions when buying security equipment and systems. The SESCP will provide a coordinated structure for private and governmental security standardization review. Members will participate in meetings to identify security problems, develop ad-hoc subcommittees (as needed) to address these identified problems, and to maintain a communications network that encourages a meaningful exchange of ideas. This program will enhance national security by providing improved security equipment and security systems based on consistent, reliable standards and certification programs.

Steele, B.J. [Sandia National Labs., Albuquerque, NM (United States); Papier, I.I. [Underwriters Labs., Inc., Northbrook, IL (United States)

1996-06-20T23:59:59.000Z

96

Medical Robots Surgical Assistants  

E-Print Network [OSTI]

1 Medical Robots Surgical Assistants Efficacy of Procedure Accuracy Longevity Invasiveness Augment human capabilities Enabling new procedures Time under anaesthetic #12;2 Surgical Robots) Sensei (Hansen Medical) Autonomous Surgical Robots Robodoc.com #12;3 Guided Surgical Robots Makosurgical

Pulfrey, David L.

97

Conventional Medical Screening Program  

Broader source: Energy.gov [DOE]

Medical screening is a strategy used to identify diseases or conditions in a select population at an early stage, often before signs and symptoms develop, and to refer individuals with suspicious findings to their personal physician or a specialist for further testing, diagnosis, and treatment. The program is not intended to serve as a substitute for routine medical exams through an individual's personal physician.

98

dieSel/heAvy equipMent College of Rural and Community Development  

E-Print Network [OSTI]

907-455-2809 www.ctc.uaf.edu/programs/diesel/ certificate Minimum Requirements for Certificate: 36 credits The diesel and heavy equipment mechanics program offers the student training in the maintenance and equipment overhauls. Students work on large truck fuel, electrical and air systems, diesel engines

Hartman, Chris

99

Conceptual design report, CEBAF basic experimental equipment  

SciTech Connect (OSTI)

The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

NONE

1990-04-13T23:59:59.000Z

100

Medical School AdmissionsMedical School AdmissionsMedical School AdmissionsMedical School Admissions Monday, April 23rd  

E-Print Network [OSTI]

Medical School AdmissionsMedical School AdmissionsMedical School AdmissionsMedical School Vaughn Asst. Dir. of Admissions: Stanford University School of Medicine · Jennifer Haluzak Dir. of Admissions: The Medical College of Wisconsin · Kurt Hansen Asst. Dean of Admissions: UW School of Medicine

Sheridan, Jennifer

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

WAMPANOAG WELLNESS EQUIPMENT LENDING BANK POLICIES & PROCEDURES  

E-Print Network [OSTI]

vacuums and steam cleaners, can be used to address immediate concerns, such as intense cleaning to remove to enable the Health Service to measure the environmental impact of the use of the equipment in the homes moisture levels or improve air quality. STEP TWO: RECOMMENDATIONS As noted, recommendations in the Home

102

Processing Equipment 2" Davis-Standard Extruder  

E-Print Network [OSTI]

Processing Equipment 2" Davis-Standard Extruder Improved Melting Grooved Feeding Capabilities Multiple Pressure Ports Along the Barrel Screw Cooling Kit Rod Die With Valved Adapter Higher Throughputs L Ring 1'' General Purpose Screw 3 Air-Cooled Barrel Zones Gala Industries Underwater Micropelletizer

Bone, Gary

103

Right-Size Heating and Cooling Equipment  

SciTech Connect (OSTI)

This is one of a series of technology fact sheets created to help housing designers and builders adopt a whole-house design approach and energy efficient design practices. The fact sheet helps people choose the correct equipment size for heating and cooling to improve comfort and reduce costs, maintenance, and energy use.

Not Available

2002-01-01T23:59:59.000Z

104

Standardized equipment labeling program for electrical utilities  

SciTech Connect (OSTI)

The purpose of this supporting document is to provide specific guidelines required for Electrical Utilities to implement and maintain a standard equipment and piping labeling program in accordance with WHC-SP-0708, Chapter 18, {open_quotes}Westinghouse Hanford Company Conduct of Operations Manual{close_quotes}. Specific guidelines include definition of program responsibilities.

Not Available

1994-07-19T23:59:59.000Z

105

Test and Test Equipment Joshua Lottich  

E-Print Network [OSTI]

Test and Test Equipment Joshua Lottich CMPE 640 11/23/05 #12;Testing Verifies that manufactured chip meets design specifications. Cannot test for every potential defect. Modeling defects as faults allows for passing and failing of chips. Ideal test would capture all defects and pass only chips

Patel, Chintan

106

PROJECT REPORT HVAC EQUIPMENT DEMOGRAPHICS AND CAPACITY  

E-Print Network [OSTI]

PROJECT REPORT HVAC EQUIPMENT DEMOGRAPHICS AND CAPACITY ANALYSIS TOOLS APPLICABLE TO MULTI Commercial HVAC Design Process 12 5.0 Conclusion 18 6.0 References 19 TABLE OF CONTENTS SECTIONS #12;MULTI performance by collectively improving the enve- lope, lighting and HVAC systems. The primary goals of the UC

California at Davis, University of

107

Standard hydrogen monitoring system equipment installation instructions  

SciTech Connect (OSTI)

This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

Schneider, T.C.

1996-09-27T23:59:59.000Z

108

Asset Management Equipment Disposal Form -Refrigerant Recovery  

E-Print Network [OSTI]

enters the waste stream with the charge intact (e.g., motor vehicle air conditioners, refrigeratorsAsset Management Equipment Disposal Form - Refrigerant Recovery Safe Disposal Requirements Under refrigeration, cold storage warehouse refrigeration, chillers, and industrial process refrigeration) has to have

Sin, Peter

109

Equipment Policy for Federal Sponsored Effective Date  

E-Print Network [OSTI]

Property Manager I. Background Division of Research Florida Atlantic University is required to comply. Equipment shall be defined as an article of nonexpendable tangible personal property. Florida Atlantic and a useful life of more than one year. III. General Statement Research Accounting and Property Management

Fernandez, Eduardo

110

NOMINAL RISK Development or Equipment Acquisition Grants  

E-Print Network [OSTI]

NOMINAL RISK Development or Equipment Acquisition Grants Land Grants Planning Grants Required and at the grant's closeout. The FAA audit recommended develop- ing a risk-based approach to monitoring grant levels of risk are identified to rank each sponsor, and the rank deter- mines the level of grant

Minnesota, University of

111

Indoor Pollutants Emitted by Electronic Office Equipment  

SciTech Connect (OSTI)

The last few decades have seen major changes in how people collect and process information at work and in their homes. More people are spending significant amounts of time in close proximity to computers, video display units, printers, fax machines and photocopiers. At the same time, efforts to improve energy efficiency in buildings by reducing leaks in building envelopes are resulting in tighter (i.e., less ventilated) indoor environments. Therefore, it is critical to understand pollutant emission rates for office equipment because even low emissions in areas that are under-ventilated or where individuals are in close proximity to the pollutant source can result in important indoor exposures. We reviewed existing literature reports on pollutant emission by office equipment, and measured emission factors of equipment with significant market share in California. We determined emission factors for a range of chemical classes including volatile and semivolatile organic compounds (VOCs and SVOCs), ozone and particulates. The measured SVOCs include phthalate esters, brominated and organophosphate flame retardants and polycyclic aromatic hydrocarbons. Measurements were carried out in large and small exposure chambers for several different categories of office equipment. Screening experiments using specific duty cycles in a large test chamber ({approx}20 m{sup 3}) allowed for the assessment of emissions for a range of pollutants. Results from the screening experiments identified pollutants and conditions that were relevant for each category of office equipment. In the second phase of the study, we used a smaller test chamber ({approx}1 m{sup 3}) to measure pollutant specific emission factors for individual devices and explored the influence of a range of environmental and operational factors on emission rates. The measured emission factors provide a data set for estimating indoor pollutant concentrations and for exploring the importance of user proximity when estimating exposure concentrations.

Maddalena, Randy L.; Destaillats, Hugo; Russell, Marion L.; Hodgson, Alfred T.; McKone, Thomas E.

2008-07-01T23:59:59.000Z

112

Medical Applications of Non-Medical Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping the NanoscaleMechanical BehaviorSummerwelcome day ofMediation

113

Training program requirements for remote equipment operators in nuclear facilities  

SciTech Connect (OSTI)

One of the most neglected areas in the engineering development of remotely operated equipment applications in nuclear environments is the planning of adequate training programs for the equipment operators. Remote equipment accidents cannot be prevented solely by engineered safety features on the equipment. As a result of the experiences in using remote equipment in the recovery effort at Three Mile Island Unit 2 (TMI-2), guidelines for the development of remote equipment operator training programs have been generated. The result is that a successful education and training program can create an environment favorable to the safe and effective implementation of a remote equipment program in a nuclear facility.

Palau, G.L.; Auclair, K.D.

1986-01-01T23:59:59.000Z

114

Quick-release medical tape  

E-Print Network [OSTI]

Medical tape that provides secure fixation of life-sustaining and -monitoring devices with quick, easy, damage-free removal represents a longstanding unmet medical need in neonatal care. During removal of current medical ...

Laulicht, Bryan E.

115

Medical treatments, fuel sources from studying elusive enzyme  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping the NanoscaleMechanical BehaviorSummerwelcomeMedicalMedical

116

Electrical Metering Equipment and Sensors Appendix D -Electrical Metering Equipment and Sensors  

E-Print Network [OSTI]

Appendix D ­ Electrical Metering Equipment and Sensors #12;D.1 Appendix D - Electrical Metering schedules, and view system status from the convenience of a standard web-browser. D.2 Metering Data Logger

117

Viewing device for electron-beam equipment  

SciTech Connect (OSTI)

Viewing devices are used to observe melting, welding, and so on in vacuum systems, an it is necessary to protect the windows from droplets and vapor. A viewing device for electron-beam equipment is described in which the viewing tube and mounting flange are made as a tubular ball joint enclosed in a steel bellows, which render the viewing device flexible. Bending the viewing tube in the intervals between observations protects the viewing window from sputtering and from drops of molten metal.

Nasyrov, R.S.

1985-06-01T23:59:59.000Z

118

PPP Equipment Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty,Orleans County,PPP Equipment Corporation Jump to: navigation,

119

BioMedical Sciences BioMedical Sciences  

E-Print Network [OSTI]

BioMedical Sciences BioMedical Sciences As a professional working in the field of biomedical science, you'll perform essential tests that are vital to the well-being of our society. The BioMedical/Medical Laboratory Science, Cytotechnology, Biomedical Sciences and Public Health Microbiology. The Diagnostic

Saldin, Dilano

120

Plant design: Integrating Plant and Equipment Models  

SciTech Connect (OSTI)

Like power plant engineers, process plant engineers must design generating units to operate efficiently, cleanly, and profitably despite fluctuating costs for raw materials and fuels. To do so, they increasingly create virtual plants to enable evaluation of design concepts without the expense of building pilot-scale or demonstration facilities. Existing computational models describe an entire plant either as a network of simplified equipment models or as a single, very detailed equipment model. The Advanced Process Engineering Co-Simulator (APECS) project (Figure 5) sponsored by the U.S. Department of Energy's National Energy Technology Laboratory (NETL) seeks to bridge the gap between models by integrating plant modeling and equipment modeling software. The goal of the effort is to provide greater insight into the performance of proposed plant designs. The software integration was done using the process-industry standard CAPE-OPEN (Computer Aided Process EngineeringOpen), or CO interface. Several demonstration cases based on operating power plants confirm the viability of this co-simulation approach.

Sloan, David (Alstrom Power); Fiveland, Woody (Alstrom Power); Zitney, S.E.; Osawe, Maxwell (Ansys, Inc.)

2007-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Direct Liquid Cooling for Electronic Equipment  

SciTech Connect (OSTI)

This report documents a demonstration of an electronic--equipment cooling system in the engineering prototype development stage that can be applied in data centers. The technology provides cooling by bringing a water--based cooling fluid into direct contact with high--heat--generating electronic components. This direct cooling system improves overall data center energy efficiency in three ways: High--heat--generating electronic components are more efficiently cooled directly using water, capturing a large portion of the total electronic equipment heat generated. This captured heat reduces the load on the less--efficient air--based data center room cooling systems. The combination contributes to the overall savings. The power consumption of the electronic equipment internal fans is significantly reduced when equipped with this cooling system. The temperature of the cooling water supplied to the direct cooling system can be much higher than that commonly provided by facility chilled water loops, and therefore can be produced with lower cooling infrastructure energy consumption and possibly compressor-free cooling. Providing opportunities for heat reuse is an additional benefit of this technology. The cooling system can be controlled to produce high return water temperatures while providing adequate component cooling. The demonstration was conducted in a data center located at Lawrence Berkeley National Laboratory in Berkeley, California. Thirty--eight servers equipped with the liquid cooling system and instrumented for energy measurements were placed in a single rack. Two unmodified servers of the same configuration, located in an adjacent rack, were used to provide a baseline. The demonstration characterized the fraction of heat removed by the direct cooling technology, quantified the energy savings for a number of cooling infrastructure scenarios, and provided information that could be used to investigate heat reuse opportunities. Thermal measurement data were used with data center energy use modeling software to estimate overall site energy use. These estimates show that an overall data center energy savings of approximately 20 percent can be expected if a center is retrofitted as specified in the models used. Increasing the portion of heat captured by this technology is an area suggested for further development.

Coles, Henry; Greenberg, Steve

2014-03-01T23:59:59.000Z

122

Medical Technology for Superior Patient  

E-Print Network [OSTI]

of electromagnetic interference, hazardous vapors, electrical power, and acoustic noise · Medical device integration

Hayden, Nancy J.

123

Transportation of medical isotopes  

SciTech Connect (OSTI)

A Draft Technical Information Document (HNF-1855) is being prepared to evaluate proposed interim tritium and medical isotope production at the Fast Flux Test Facility (FFTF). This assessment examines the potential health and safety impacts of transportation operations associated with the production of medical isotopes. Incident-free and accidental impacts are assessed using bounding source terms for the shipment of nonradiological target materials to the Hanford Site, the shipment of irradiated targets from the FFTF to the 325 Building, and the shipment of medical isotope products from the 325 Building to medical distributors. The health and safety consequences to workers and the public from the incident-free transportation of targets and isotope products would be within acceptable levels. For transportation accidents, risks to works and the public also would be within acceptable levels. This assessment is based on best information available at this time. As the medical isotope program matures, this analysis will be revised, if necessary, to support development of a final revision to the Technical Information Document.

Nielsen, D.L.

1997-11-19T23:59:59.000Z

124

After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment  

SciTech Connect (OSTI)

This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in Pittsburgh, Pennsylvania, and five are in Atlanta, Georgia.

Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

2004-01-22T23:59:59.000Z

125

E-Print Network 3.0 - air conditioning equipments Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

equipments Search Powered by Explorit Topic List Advanced Search Sample search results for: air conditioning equipments...

126

E-Print Network 3.0 - air conditioning equipment Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

equipment Search Powered by Explorit Topic List Advanced Search Sample search results for: air conditioning equipment...

127

Equipment design guidance document for flammable gas waste storage tank new equipment  

SciTech Connect (OSTI)

This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas.

Smet, D.B.

1996-04-11T23:59:59.000Z

128

Emissions characteristics of modern oil heating equipment  

SciTech Connect (OSTI)

Over the last 10 years there have been some very interesting developments in oil heating. These include higher static pressure burners, air atomizing nozzles, low firing rate nozzles, low heat loss combustion chambers and condensing boilers and furnaces. The current data base on the emissions characteristics of oil-fired residential heating equipment is based primarily on data taken in the 1970's. The objective of the work described in this report is to evaluate the effects of recent developments in oil-fired equipment on emissions. Detailed emissions measurements have been made on a number of currently available residential oil burners and whole systems selected to represent recent development trends. Some additional data was taken with equipment which is in the prototype stage. These units are a prevaporizing burner and a retention head burner modified with an air atomizing nozzle. Measurements include No{sub x}, smoke numbers, CO, gas phase hydrocarbon emissions and particulate mass emission rates. Emissions of smoke, CO and hydrocarbons were found to be significantly greater under cyclic operation for all burners tested. Generally, particulate emission rates were found to be 3 to 4 times greater in cyclic operation than in steady state. Air atomized burners were found to be capable of operation at much lower excess air levels than pressure atomized burners without producing significant amounts of smoke. As burner performance is improved, either through air atomization or prevaporization of the fuel, there appears to be a general trend towards producing CO at lower smoke levels as excess air is decreased. The criteria of adjusting burners for trace smoke may need to be abandoned for advanced burners and replaced with an adjustment for specific excess air levels. 17 refs., 15 figs., 6 tabs.

Krajewski, R.; Celebi, Y.; Coughlan, R.; Butcher, T.; McDonald, R.J.

1990-07-01T23:59:59.000Z

129

A lessee's guide to leasing industrial equipment  

E-Print Network [OSTI]

Costing $10, 000 with 10- Year Depreciation Term and no Scrap Value Comparison of Five Methods of Acquiring Equipment Valued at $100, 000 with a Usable Life of 10 Years and no Scrap Value 10 III. Projected Earnings on Capital Freed by Leasing 13 IV... this tax saving results in the loss of one advantage of leasing. If, in the projection of the tax savings, it is found that the tax saving is inunaterial to the lessee, then it is quite possible that leasing will prove undesirable. But to those whose...

Johnson, Jones Eugene

1959-01-01T23:59:59.000Z

130

LANSCE | Lujan Center | Instruments | ASTERIX | Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample Environment: Magnet and cryostat system offering 0-1 T

131

LCLS Equipment Inventory | Sample Preparation Laboratories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample Environment: Magnet and6 th7525T HE F IRSTA3LCLS

132

Laboratory Equipment Donation Program - About Us  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&Dynamos Professor CaryAbout

133

Laboratory Equipment Donation Program - Administrative Login  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&Dynamos Professor

134

Laboratory Equipment Donation Program - Contact Us  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&Dynamos ProfessorContact Us

135

Laboratory Equipment Donation Program - Guidelines/FAQ  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&DynamosFrequently Asked

136

Laboratory Equipment Donation Program - Site Index  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&DynamosFrequentlySite Index

137

INL Equipment to Aid Regional Response Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinementEtching. | EMSL Bubblesstructure linkLet'sINL Equipment to

138

Equipment-Resources-PHaSe-EFRC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy and Assistance100 ton Stanat rolling mill 75 TonEquipment

139

Experimental Equipment | Stanford Synchrotron Radiation Lightsource  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4:Epitaxial Thin FilmEquipment SSRL plans the distribution of its

140

GT Equipment Techologies (Gti) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpen EnergyBoard" form. To create aGA SNCGT Equipment Techologies

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Building Equipment Technologies | Clean Energy | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareersEnergy,Services » PPPOAmerica »ofEquipment SHARE

142

Microsoft Word - Equipment-Training List  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMappingENVIRONMENTAL IMPACTApproved:GEORGEICReduced Form

143

Better Buildings Alliance Equipment Performance Specifications  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd: ScopeDepartment ofEnergyBeowawe7:for ConsumersBBA Equipment

144

Wind Equipment: Creating Jobs Along the Lake Erie Shore | Department...  

Broader source: Energy.gov (indexed) [DOE]

Wind Equipment: Creating Jobs Along the Lake Erie Shore Wind Equipment: Creating Jobs Along the Lake Erie Shore August 16, 2012 - 9:36am Addthis 1 of 3 Finished wind tower sections...

145

SAFETY SLIDES Electrospraying/Electrospinning equipment in 66-353  

E-Print Network [OSTI]

SAFETY SLIDES Electrospraying/Electrospinning equipment in 66-353 1 #12;Overview of electrospinning apparatus 2 #12;Safety Slides ­ High voltage electrical equipment 3 Maximum voltage ~ 40,000 V Low current

Cohen, Robert E.

146

Anne Arundel County- Solar and Geothermal Equipment Property Tax Credits  

Broader source: Energy.gov [DOE]

Anne Arundel County offers a one-time credit from county property taxes on residential dwellings that use solar and geothermal energy equipment for heating and cooling, and solar energy equipment...

147

Anne Arundel County- Solar and Geothermal Equipment Property Tax Credit  

Broader source: Energy.gov [DOE]

This is a one-time credit from county property taxes on residential structures that use solar and geothermal energy equipment for heating and cooling and solar energy equipment for water heating...

148

Property Tax Exemption for Machinery, Equipment, Materials, and Supplies (Kansas)  

Broader source: Energy.gov [DOE]

The Property Tax Exemption for Machinery, Equipment, Materials, and Supplies exists for low-dollar items of machinery, equipment, materials and supplies used for business purposes, or in activities...

149

Data Network Equipment Energy Use and Savings Potential in Buildings  

E-Print Network [OSTI]

Premises Equip. Total Energy Power (W) Port/Device Table 2.Premises Equip. Total Energy Power (W) Port/Device Figure 2:off individual ports and saving energy. Redesigning the

Lanzisera, Steven

2010-01-01T23:59:59.000Z

150

Difficulty of Measuring Emissions from Heavy-Duty Engines Equipped...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Difficulty of Measuring Emissions from Heavy-Duty Engines Equipped with SCR and DPF Difficulty of Measuring Emissions from Heavy-Duty Engines Equipped with SCR and DPF In reference...

151

1997 Housing Characteristics Tables Home Office Equipment Tables  

U.S. Energy Information Administration (EIA) Indexed Site

States, Percent of U.S. Households, 1997 1 HC7-8b. Home Office Equipment by UrbanRural Location, Percent of U.S. Households, 1997 1 HC7-9b. Home Office Equipment by...

152

Training Room Equipment Instructions Projector and TV Display  

E-Print Network [OSTI]

Training Room Equipment Instructions Projector and TV Display The control panel on the wall are connected to a training room computer and room is equipped with a keyboard, mouse and clicker. Connect USB

Crawford, T. Daniel

153

Optimal Sequencing of Central Refrigeration Equipment in an Industrial Plant  

E-Print Network [OSTI]

A model was developed to find a viable solution to the problem of selecting the optimal sequence of refrigeration equipment (chillers, cooling towers, pumps) to operate in a Central Utility Plant. The optimal equipment sequence is that sequence...

Fiorino, D. P.; Priest, J. W.

1986-01-01T23:59:59.000Z

154

Best Management Practice #9: Single-Pass Cooling Equipment  

Broader source: Energy.gov [DOE]

Single-pass or once-through cooling systems provide an opportunity for significant water savings. In these systems, water is circulated once through a piece of equipment and is then disposed down the drain. Types of equipment that typically use single-pass cooling include CAT scanners, degreasers, hydraulic equipment, condensers, air compressors, welding machines, vacuum pumps, ice machines, x-ray equipment, and air conditioners.

155

Medical imaging systems  

DOE Patents [OSTI]

A medical imaging system provides simultaneous rendering of visible light and diagnostic or functional images. The system may be portable, and may include adapters for connecting various light sources and cameras in open surgical environments or laparascopic or endoscopic environments. A user interface provides control over the functionality of the integrated imaging system. In one embodiment, the system provides a tool for surgical pathology.

Frangioni, John V

2013-06-25T23:59:59.000Z

156

STUDENT ASSESSMENT MEDICAL FORMSTUDENT ASSESSMENT MEDICAL FORMSTUDENT ASSESSMENT MEDICAL FORMSTUDENT ASSESSMENT MEDICAL FORM Yonsei University  

E-Print Network [OSTI]

NO 9) Have you ever received treatment for drug or alcohol addiction? YES NO 10) Have you ever been) Do you have any pre-existing conditions? YES NO 2) Do you currently receive any treatments? YES NO 11) Have you ever had treatment in a medical institution? YES NO 12) If you have answered

Burgstaller, Bernd

157

MEDICAL SCIENCE SYLLABUS 2014  

E-Print Network [OSTI]

Neurology 63 Medical Oncology/Hematology 64 Hematology 65 Internal Related Radiology 66 Radiation Oncology;Pediatrics 71 General Pediatrics 72 Dermatology 73 Phychiatry 74 Laboratory Medicine 75 Metabolomics Research Breast Surgery 84 Cardiovascular Surgery 85 Thoracic Surgery 86 Pediatric Surgery 87 Surgery Related

Banbara, Mutsunori

158

Safe Operating Procedure LOCKOUT/TAGOUT FOR MACHINES & EQUIPMENT  

E-Print Network [OSTI]

Safe Operating Procedure (5/11) LOCKOUT/TAGOUT FOR MACHINES & EQUIPMENT: SPECIAL CIRCUMSTANCES://ehs.unl.edu/) Introduction This SOP is intended to work in tandem with other EHS SOPs related to Lockout/Tagout (LO/TO): · Lockout/Tagout for Machines & Equipment: Program Overview · Lockout/Tagout for Machines & Equipment

Farritor, Shane

159

Vehicle and Heavy Equipment Integrated Product & Process Development (IPPD)  

E-Print Network [OSTI]

Vehicle and Heavy Equipment Integrated Product & Process Development (IPPD) Technology Development City, IA 52242 Beckermann, C., and Fischer, G.W., "Vehicle and Heavy Equipment Integrated Product, 1993. #12;Abstract An overview is presented of the recently proposed Vehicle and Heavy Equipment

Beckermann, Christoph

160

BIODIESEL BLENDS IN SPACE HEATING EQUIPMENT.  

SciTech Connect (OSTI)

Biodiesel is a diesel-like fuel that is derived from processing vegetable oils from various sources, such as soy oil, rapeseed or canola oil, and also waste vegetable oils resulting from cooking use. Brookhaven National laboratory initiated an evaluation of the performance of blends of biodiesel and home heating oil in space heating applications under the sponsorship of the Department of Energy (DOE) through the National Renewable Energy Laboratory (NREL). This report is a result of this work performed in the laboratory. A number of blends of varying amounts of a biodiesel in home heating fuel were tested in both a residential heating system and a commercial size boiler. The results demonstrate that blends of biodiesel and heating oil can be used with few or no modifications to the equipment or operating practices in space heating. The results also showed that there were environmental benefits from the biodiesel addition in terms of reductions in smoke and in Nitrogen Oxides (NOx). The latter result was particularly surprising and of course welcome, in view of the previous results in diesel engines where no changes had been seen. Residential size combustion equipment is presently not subject to NOx regulation. If reductions in NOx similar to those observed here hold up in larger size (commercial and industrial) boilers, a significant increase in the use of biodiesel-like fuel blends could become possible.

KRISHNA,C.R.

2001-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Attachment 2 UC Berkeley EI-LOTO "Equipment Specific" Procedure Equip. Name: _______________________________ Building: __________________________________ Location/Room Number: _____________________  

E-Print Network [OSTI]

of work here: Instructions: Follow the steps to create a written sequence for de-energizing, lockout / training for the equipment-specific lockout process. Discuss with workers how equipment energy isolation

Cohen, Ronald C.

162

Energy Intense Equipment Purchasing Behaviour: A Review of the Literature i How do consumers and firms purchase equipment  

E-Print Network [OSTI]

Energy Intense Equipment Purchasing Behaviour: A Review of the Literature i CIEEDAC How do, 2007 #12;Energy Intense Equipment Purchasing Behaviour: A Review of the Literature ii Executive Summary Energy intense equipment purchasing behaviour: A review of the literature. CIEEDAC has been charged

163

Space and Movable Equipment Inventory Revision: July 31, 2014 CERTIFICATION OF SPACE AND MOVABLE EQUIPMENT INVENTORY -FISCAL YEAR 2014  

E-Print Network [OSTI]

Space and Movable Equipment Inventory Revision: July 31, 2014 CERTIFICATION OF SPACE AND MOVABLE EQUIPMENT INVENTORY - FISCAL YEAR 2014 TO BE USED FOR IBB PLANNING FOR FISCAL YEAR 2016 I acknowledge that the space and movable equipment inventory results conducted for this fiscal year will be used for IBB

Hayden, Nancy J.

164

Emergency sacrificial sealing method in filters, equipment, or systems  

DOE Patents [OSTI]

A system seals a filter or equipment component to a base and will continue to seal the filter or equipment component to the base in the event of hot air or fire. The system includes a first sealing material between the filter or equipment component and the base; and a second sealing material between the filter or equipment component and the base and proximate the first sealing material. The first sealing material and the second seal material are positioned relative to each other and relative to the filter or equipment component and the base to seal the filter or equipment component to the base and upon the event of fire the second sealing material will be activated and expand to continue to seal the filter or equipment component to the base in the event of hot air or fire.

Brown, Erik P

2014-09-30T23:59:59.000Z

165

Positive materials identification of existing equipment  

SciTech Connect (OSTI)

Considerable engineering effort and expertise are expended for materials selection at refining and petrochemical facilities. However, the benefits of this effort are undermined if there is an inadvertent material substitution during construction. Although procedures have always been in place to reduce the chance of such substitutions, it is known that these errors have occurred. Accordingly, over the years the industry has periodically reviewed and improved quality control in this effort. However, many older facilities that did not benefit from today`s procedures are still in operation. As a consequence, some companies have conducted positive material identification (PMI) verification of existing equipment. This process is further complicated by the fact that the most susceptible components are typically insulated and must be located. Once located, accessibility and operating temperatures are complicating issues. This paper describes prioritization issues and hardware tradeoffs for conducting a PMI verification program.

Wolf, H.A. [Exxon Research and Engineering Co., Florham Park, NJ (United States)

1996-07-01T23:59:59.000Z

166

Power System Equipment Module Test Project  

SciTech Connect (OSTI)

The technology of electric power generation when applying the binary process to hydrothermal resources had not yet been demonstrated in the United States. Accordingly, on November 10, 1977, the Electric Power Research Institute and the Department of Energy, acting through the Lawrence Berkeley Laboratory, agreed to cofund the Power System Equipment Module Test Project. The Power System Equipment Module Test Project consisted of a field test program to accomplish the objectives listed below while heating hydrocarbon fluids to above their critical points, expanding these fluids, and subsequently, condensing them below their critical points: (1) Verify the performance of state-of-the-art heat exchangers in geothermal service; (2) Verify the heat exchangers' performance heating either selected pure light hydrocarbons or selected mixtures of light hydrocarbons in the vicinity of their respective critical pressures and temperatures; (3) Establish overall heat transfer coefficients that might be used for design of commercial-size geothermal power plants using the same geothermal brine and light hydrocarbon working fluids; (4) Perform and investigate the above under representative fluid operating conditions during which the production wells would be pumped. The project was accomplished by diverting approximately 200 gpm of the flow from one of Magma Power Company's geothermal wells in the East Mesa Geothermal Field. After the heat was removed from the geothermal brine flow, the cooled flow was returned to Magma Power Company and recombined with the main brine stream for disposal by reinjection. Approximately five thermal megawatts was transferred from geothermal brine to hydrocarbon working fluids in a closed system. This heat was removed from the working fluids in a condenser and subsequently rejected to the environment by a wet cooling tower. The thermodynamic performance of both the working fluids and the system components was measured during the test program to achieve the project's objectives.

Schilling, J.R.

1980-12-01T23:59:59.000Z

167

NIH Medical Research Scholars Program  

E-Print Network [OSTI]

1 NIH Medical Research Scholars Program · A comprehensive, year-long residential research enrichment program for medical, dental, and veterinary students · NIH Intramural Research Program in Bethesda' personal interests and career goals NIH Medical Research Scholars Program -1 · Blends elements of two

Bushman, Frederic

168

Workshop on environmental qualification of electric equipment  

SciTech Connect (OSTI)

Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratories (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing.

Lofaro, R.; Gunther, W.; Villaran, M.; Lee, B.S.; Taylor, J. [comps.] [Brookhaven National Lab., Upton, NY (United States)

1994-05-01T23:59:59.000Z

169

Providence Newberg Medical Center  

High Performance Buildings Database

Newberg, OR In 2002, Providence Health & Services began planning a new 188,000 square foot medical center in Newberg, Oregon to respond to the growing community's need for accessible health care. Since this was Providence's first new hospital in almost thirty years, its leaders decided to approach the project through innovative planning, design, and construction, including the achievement of lifecycle energy savings and a potential LEED certification. The hospital is comprised of 40 inpatient beds with views out to the surrounding rural landscape or into lushly planted internal courtyards.

170

Alternative Fuel and Advanced Technology Commercial Lawn Equipment (Brochure)  

SciTech Connect (OSTI)

The U.S. Department of Energy's Clean Cities program produced this guide to help inform the commercial mowing industry about product options and potential benefits. This guide provides information about equipment powered by propane, ethanol, compressed natural gas, biodiesel, and electricity, as well as advanced engine technology. In addition to providing an overview for organizations considering alternative fuel lawn equipment, this guide may also be helpful for organizations that want to consider using additional alternative fueled equipment.

Not Available

2014-10-01T23:59:59.000Z

171

Microsoft Word - CX-SnohomishPUD Equipment Purchase_140521  

Broader source: Energy.gov (indexed) [DOE]

data acquisition equipment (including kilowatt hour quantity) Bay 15: three current transformers Bay 15: three voltage transformers Bay 2: SCADA 5 systems, plus Snohomish data...

172

Philadelphia Gas Works- Residential and Small Business Equipment Rebate Program  

Broader source: Energy.gov [DOE]

Philadelphia Gas Works' (PGW) Residential Heating Equipment rebates are available to all PGW residential or small business customers installing high efficiency boilers and furnaces, and...

173

Jefferson Lab Tech Associate Invents Lockout Device for Equipment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tech Associate Invents Lockout Device for Equipment with Removable Power Cords April 22, 2002 It was the early 1990s and building Jefferson Lab's Continuous Electron Beam...

174

Technical Meeting: Physical Characterization of Connected Buildings Equipment  

Broader source: Energy.gov [DOE]

On January 28-29, 2015, BTO hosted a technical meeting on the Physical Characterization of Connected Buildings Equipment at the Chicago, IL Courtyard Downtown Hotel.

175

Electric Vehicle Supply Equipment (EVSE) Test Report: AeroVironment  

Broader source: Energy.gov (indexed) [DOE]

pROGRAM Electric Vehicle Supply Equipment (EVSE) Test Report: AeroVironment EVSE Features LED status light EVSE Specifications Grid connection Hardwired Connector type J1772 Test...

176

Collecting Construction Equipment Activity Data from Caltrans Project Records  

E-Print Network [OSTI]

Specifications lay out the procedures and rules to beis a more complex procedure than resurfacing and involvesdo not involve the procedures and quantity of equipment used

Kable, Justin M

2008-01-01T23:59:59.000Z

177

Novel Energy Conversion Equipment for Low Temperature Geothermal...  

Open Energy Info (EERE)

equipment for "reverse refrigeration" to generate electricity: This approach allows Johnson Controls to take advantage of the economies of scale and manufacturing experience...

178

Surveillance Guide - OSS 19.1 Personal Protective Equipment  

Broader source: Energy.gov (indexed) [DOE]

Date: Facility Representative RL Facility Representative Program May 23, 1995 Surveillance Guide OSS 19.1 Revision 0 Personal Protective Equipment Page 5 of 5...

179

Condensing Heating and Water Heating Equipment Workshop Location...  

Energy Savers [EERE]

Condensing Heating and Water Heating Equipment Workshop Location: Washington Gas Light Appliance Training Facility 6801 Industrial Road Springfield, VA Date: October 9, 2014 Time:...

180

Philadelphia Gas Works- Commercial and Industrial Equipment Rebate Program (Pennsylvania)  

Broader source: Energy.gov [DOE]

Philadelphia Gas Works' (PGW) Commercial and Industrial Equipment rebates are available to all PGW commercial and industrial customers installing high efficiency boilers or eligible commercial food...

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Puget Sound Energy- Commercial Energy Efficient Equipment Rebate Programs  

Broader source: Energy.gov [DOE]

Puget Sound Energy's (PSE) Energy Efficient Equipment Rebate Programs offer a variety of incentives to non-residential customers. Eligible technologies include lighting measures, air conditioners,...

182

Cold test data for equipment acceptance into 105-KE Basin  

SciTech Connect (OSTI)

This document provides acceptance testing of equipment to be installed in the 105-KE Basin for pumping sludge to support the discharge chute barrier doors installation.

Packer, M.J.

1994-11-09T23:59:59.000Z

183

Equipment and capabilities at Los Alamos National Laboratory...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alamos instruments Equipment and capabilities at Los Alamos National Laboratory's Lujan Neutron Scattering Center enabled a geologist to determine that a dazzling 217.78-gram...

184

Novel Energy Conversion Equipment for Low Temperatures Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Novel Energy Conversion Equipment for Low Temperature Geothermal Resources City of Eagan Civic Ice Arena Renovation Canby Cascaded Geothermal Project Phase 1 Feasibility...

185

Appendix D: Facility Process Data and Appendix E: Equipment Calibratio...  

Broader source: Energy.gov (indexed) [DOE]

D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria,...

186

E-Print Network 3.0 - automatic equipment identification Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Northwestern University Collection: Materials Science ; Chemistry 52 EQUIPMENT LOCKOUTTAGOUT UNO Campus Safety Policy Summary: : equipment identification, department...

187

Cancer Research Institute, Loma Linda University Medical Center  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an Environmental Assessment (EA) DOE/EA-0975, evaluating the construction, equipping and operation of the Cancer Research Institute (CRI) at the Loma Linda University Medical Center (LLUMC) on its campus in Loma Linda, California. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required. This document describes alternatives, the affected environment and environmental consequences of the proposed action.

NONE

1994-08-01T23:59:59.000Z

188

SANTA CRUZ: EQUIPMENT ADMINISTRATION UCSC PHYSICAL INVENTORY PROCEDURE  

E-Print Network [OSTI]

SANTA CRUZ: EQUIPMENT ADMINISTRATION UCSC PHYSICAL INVENTORY PROCEDURE Rev. 03/01/07 1 DUE: APRIL 1, 2014 Attached is a copy of the 2013 EQ920 report of physical inventory of equipment in your care of steps in completing the physical inventory. It is recommended that you begin the process as early

California at Santa Cruz, University of

189

2006 Haulage & Loading Conference: big equipment, big crowd  

SciTech Connect (OSTI)

The theme of this year's Haulage and Loading Conference was 'Is better still better?' Most of the presenters either considered the effectiveness of bigger equipment or examined other strategies from various perspectives, based on their experiences. Papers were presented on trucks, shovels, loaders, excavators, haul road design and maintenance, and incorporating IT equipment. 5 photos.

NONE

2006-06-15T23:59:59.000Z

190

Data Network Equipment Energy Use and Savings Potential in Buildings  

SciTech Connect (OSTI)

Network connectivity has become nearly ubiquitous, and the energy use of the equipment required for this connectivity is growing. Network equipment consists of devices that primarily switch and route Internet Protocol (IP) packets from a source to a destination, and this category specifically excludes edge devices like PCs, servers and other sources and sinks of IP traffic. This paper presents the results of a study of network equipment energy use and includes case studies of networks in a campus, a medium commercial building, and a typical home. The total energy use of network equipment is the product of the stock of equipment in use, the power of each device, and their usage patterns. This information was gathered from market research reports, broadband market penetration studies, field metering, and interviews with network administrators and service providers. We estimate that network equipment in the USA used 18 TWh, or about 1percent of building electricity, in 2008 and that consumption is expected to grow at roughly 6percent per year to 23 TWh in 2012; world usage in 2008 was 51 TWh. This study shows that office building network switches and residential equipment are the two largest categories of energy use consuming 40percent and 30percent of the total respectively. We estimate potential energy savings for different scenarios using forecasts of equipment stock and energy use, and savings estimates range from 20percent to 50percent based on full market penetration of efficient technologies.

Lanzisera, Steven; Nordman, Bruce; Brown, Richard E.

2010-06-09T23:59:59.000Z

191

Safe Operating Procedure LOCKOUT/TAGOUT FOR MACHINES & EQUIPMENT  

E-Print Network [OSTI]

Safe Operating Procedure (5/11) LOCKOUT/TAGOUT FOR MACHINES & EQUIPMENT: TRAINING AND INSPECTIONS during maintenance and repair operations. In these situations, a Lockout/Tagout (LO/TO) program must "Control of Hazardous Energy: Lockout/Tagout (LO/TO) for Machines and Equipment." This course is available

Farritor, Shane

192

Space and Movable Equipment On-line Inventory  

E-Print Network [OSTI]

Space and Movable Equipment On-line Inventory FY14 (July 2013 - June 2014) CAS Cost Accounting and Michael Richards #12;Learning Objectives Gain understanding of the Importance of Space & Equipment Inventory. Understand the entire Inventory Process. How to classify functional space. How to inventory

Hayden, Nancy J.

193

Plutonium finishing plant safety systems and equipment list  

SciTech Connect (OSTI)

The Safety Equipment List (SEL) supports Analysis Report (FSAR), WHC-SD-CP-SAR-021 and the Plutonium Finishing Plant Operational Safety Requirements (OSRs), WHC-SD-CP-OSR-010. The SEL is a breakdown and classification of all Safety Class 1, 2, and 3 equipment, components, or system at the Plutonium Finishing Plant complex.

Bergquist, G.G.

1995-01-06T23:59:59.000Z

194

Applications of Artificial Neural Networks (ANNs) to Rotating Equipment  

E-Print Network [OSTI]

including (but not limited to) oil and gas industries, petrochemical plants, power plants, transmission.asgari@pg.canterbury.ac.nz Abstract Rotating equipment is the beating heart of nearly all industrial plants and specifically plays) [1]. Today, a variety of rotating equipment is being used widely in different industrial plants

Sainudiin, Raazesh

195

RESPONSE TO OXYGEN DEFICIENCY SENSING EQUIPMENT IN LABORATORIES  

E-Print Network [OSTI]

/or lights to warn both the room occupants and those outside the room of the hazard within. 2. Equipment: Vacuum flask that holds liquid air or helium for scientific experiments. Hazardous Atmosphere. Type and location of oxygen deficiency monitoring equipment. When New York Fire Department (FDNY

Jia, Songtao

196

Faculty Position Therapeutic Medical Physics  

E-Print Network [OSTI]

spectroscopy, fluoroscopy, ultrasound, digital radiography, and nuclear medicine. The Colorado State University of subjects in Radiation Therapy Physics, Medical Imaging Physics, and Radiological Physics and Dosimetry

197

Medication List- September 14, 2010  

Broader source: Energy.gov [DOE]

This scale is created to provide a guide for the physician determination of ability to work for HRP certified persons with certain conditions and while taking certain medications.

198

Equipment specifications for an electrochemical fuel reprocessing plant  

SciTech Connect (OSTI)

Electrochemical reprocessing is a technique used to chemically separate and dissolve the components of spent nuclear fuel, in order to produce new metal fuel. There are several different variations to electrochemical reprocessing. These variations are accounted for by both the production of different types of spent nuclear fuel, as well as different states and organizations doing research in the field. For this electrochemical reprocessing plant, the spent fuel will be in the metallurgical form, a product of fast breeder reactors, which are used in many nuclear power plants. The equipment line for this process is divided into two main categories, the fuel refining equipment and the fuel fabrication equipment. The fuel refining equipment is responsible for separating out the plutonium and uranium together, while getting rid of the minor transuranic elements and fission products. The fuel fabrication equipment will then convert this plutonium and uranium mixture into readily usable metal fuel.

Hemphill, Kevin P [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

199

Unwanted Materials and Equipment All unwanted materials and equipment must go through Salvage (x2329) for disposal or reuse.  

E-Print Network [OSTI]

Unwanted Materials and Equipment All unwanted materials and equipment must go through Salvage (x.stanford.edu/main/propertyforms.asp) Some items may require a Radiation Survey or handling by Waste Management. Follow the directions with collecting empty moving boxes, and taking materials to trash or recycling containers. Submit a Service

Wechsler, Risa H.

200

The Academy Harvard Medical School  

E-Print Network [OSTI]

The Academy Harvard Medical School Annual Report 2010 - 2011 #12;#12;To the HMS Community Academic year 2011 was another exciting and productive period for the Harvard Medical School Academy. Our Collaborative was also strengthened as the Academy tried to expand upon its outreach initiatives to the clinical

Paulsson, Johan

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Discover your Library Medical Library  

E-Print Network [OSTI]

Discover your Library Medical Library Welcome to the Gus Fraenkel Medical Library. The Library is a branch of the Flinders University Libraries including: Central (on the Plaza of the north ridge precinct) Law (on level 3 of the Central Library building) Sturt (at the Sturt precinct) as well

202

Medical accelerator safety considerations: Report of AAPM Radiation Therapy Committee Task Group No. 35  

SciTech Connect (OSTI)

Ensuring safe operation for a medical accelerator is a difficult task. Users must assume more responsibility in using contemporary equipment. Additionally, users must work closely with manufacturers in promoting the safe and effective use of such complex equipment. Complex treatment techniques and treatment modality changeover procedures merit detailed, unambiguous written procedural instruction at the control console. A thorough hands on training period after receiving instructions, and before assuming treatment responsibilities, is essential for all technologists. Unambiguous written instructions must also be provided to guide technologists in safe response when equipment malfunctions or exhibits unexpected behavior or after any component has been changed or readjusted. Technologists should be given a written list of the appropriate individuals to consult when unexpected machine behavior occurs. They should be assisted in identifying aberrant behavior of equipment. Many centers already provide this instruction, but others may not. Practiced response and discussion with technologists should be a part of an ongoing quality assurance program. An important aspect of a safety program is the need for continuous vigilance. Table III gives a summary of a comprehensive safety program for medical accelerators. Table IV gives a list of summary recommendations as an example of how one might mitigate the consequences of an equipment failure and improve procedures and operator response in the context of the environment described. Most of these recommendations can be implemented almost immediately at any individual treatment center.

Purdy, J.A.; Biggs, P.J.; Bowers, C.; Dally, E.; Downs, W.; Fraass, B.A.; Karzmark, C.J.; Khan, F.; Morgan, P.; Morton, R.

1993-07-01T23:59:59.000Z

203

Medical imaging systems  

DOE Patents [OSTI]

A medical imaging system provides simultaneous rendering of visible light and fluorescent images. The system may employ dyes in a small-molecule form that remains in a subject's blood stream for several minutes, allowing real-time imaging of the subject's circulatory system superimposed upon a conventional, visible light image of the subject. The system may also employ dyes or other fluorescent substances associated with antibodies, antibody fragments, or ligands that accumulate within a region of diagnostic significance. In one embodiment, the system provides an excitation light source to excite the fluorescent substance and a visible light source for general illumination within the same optical guide that is used to capture images. In another embodiment, the system is configured for use in open surgical procedures by providing an operating area that is closed to ambient light. More broadly, the systems described herein may be used in imaging applications where a visible light image may be usefully supplemented by an image formed from fluorescent emissions from a fluorescent substance that marks areas of functional interest.

Frangioni, John V. (Wayland, MA)

2012-07-24T23:59:59.000Z

204

French Sizing of Medical Devices is not Fit for Purpose  

SciTech Connect (OSTI)

PurposeThe purpose of the study is to quantify the variation in the metric equivalent of French size in a range of medical devices, from various manufacturers, used in interventional radiology.MethodsThe labelling of a range of catheters, introducers, drains, balloons, stents, and endografts was examined. Products were chosen to achieve a broad range of French sizes from several manufacturers. To assess manufacturing accuracy, eight devices were selected for measurement using a laser micrometer. The external diameters of three specimens of each device were measured at centimeter intervals along the length of the device to ensure uniformity.ResultsA total of 200 labels of interventional radiology equipment were scrutinized. The results demonstrate a wide variation in the metric equivalent of French sizing. Labelled products can vary in diameter across the product range by up to 0.79 mm.The devices selected for measurement with the non-contact laser micrometer demonstrate acceptable manufacturing consistency. The external diameter differed by 0.05 mm on average.ConclusionsOur results demonstrate wide variation in the interpretation of the French scale by different manufacturers of medical devices. This has the potential to lead to problems using coaxial systems especially when the products are from different manufacturers. It is recommended that standard labelling should be employed by all manufacturers conveying specific details of the equipment. Given the wide variation in the interpretation of the French scale, our opinion is that this scale either needs to be abandoned or be strictly defined and followed.

Kibriya, Nabil, E-mail: nabskib@yahoo.co.uk; Hall, Rebecca; Powell, Steven [The Royal Liverpool University Hospital, Radiology Department (United Kingdom); How, Thien [University of Liverpool, Faculty of Health and Life Sciences (United Kingdom); McWilliams, Richard G. [The Royal Liverpool University Hospital, Radiology Department (United Kingdom)

2013-08-01T23:59:59.000Z

205

Cold-Start Emissions Control in Hybrid Vehicles Equipped with...  

Broader source: Energy.gov (indexed) [DOE]

Emissions Control in Hybrid Vehicles Equipped with a Passive Adsorber for Hydrocarbons and NOx Z. Gao, C.S. Daw, M.-Y. Kim, J.-S. Choi, J.E. Parks II, and D.E. Smith Oak Ridge...

206

Sales and Use Tax Exemption for Electrical Generating Equipment  

Broader source: Energy.gov [DOE]

In Indiana, transactions involving manufacturing machinery, tools, and equipment are exempt from the state gross retail tax if the property is used for the production of tangible personal property,...

207

Analysis and Evaluation For Equipment Performance by Surface Measurement  

E-Print Network [OSTI]

Many building owners and facility managers are deeply interested in both operation and maintenance costs related to a building's life cycle. Optimizing energy consumption and obtaining long equipment activity requires sophisticated management...

Ishizuka, K.; Aizawa, N.; Shibata, K.; Yonezawa, H.; Yamada, S.

2006-01-01T23:59:59.000Z

208

Design of an underwater vertical glider for subsea equipment delivery  

E-Print Network [OSTI]

Delivery of subsea equipment and sensors is generally accomplished with unguided sinking platforms or powered autonomous underwater vehicles (AUVs). An alternative would be to augment existing platforms with navigation and ...

Ambler, Charles Kirby

2010-01-01T23:59:59.000Z

209

Electric Vehicle Supply Equipment (EVSE) Test Report: Voltec...  

Broader source: Energy.gov (indexed) [DOE]

VEhICLE TEChNOLOgIES pROgRAm Electric Vehicle Supply Equipment (EVSE) Test Report: Voltec 240V EVSE Features Integrated Flashlight 25ft of coiled cable Auto-reset EVSE...

210

Fact #708: January 2, 2012 Amenities, Safety and Emissions Equipment...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Emissions Equipment Make Up an Increasing Share of the Cost of a Car While the overall price of a new car has not increased greatly from 1967 to 2010 when adjusted for inflation,...

211

Improving reuse of semiconductor equipment through benchmarking, standardization, and automation  

E-Print Network [OSTI]

The 6D program at Intel Corporation was set up to improve operations around capital equipment reuse, primarily in their semiconductor manufacturing facilities. The company was faced with a number of challenges, including ...

Silber, Jacob B. (Jacob Bradley)

2006-01-01T23:59:59.000Z

212

General Restaurant Equipment: Proposed Penalty (2013-CE-5344)  

Broader source: Energy.gov [DOE]

DOE alleged in a Notice of Proposed Civil Penalty that General Restaurant Equipment Co. failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

213

Goulden Lab Equipment and Facilities Lab: 1400 ft2  

E-Print Network [OSTI]

closed path IRGAS, (8) aluminum or steel towers ranging in height from 10' to 100', (70) 90 to 120 W solar panels. General meteorology and data acquisition equipment: Approx (50) miscellaneous data loggers

Rose, Michael R.

214

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network [OSTI]

end users to select the most energy efficient equipment when replacing motors, motor drives, transformers, lamps, ballasts, etc., given costs associated with energy consumption when compared with installation. The selection of replacement parts...

Massey, G. W.

2005-01-01T23:59:59.000Z

215

FINANCE PROCEDURES MANUAL PROPERTY, PLANT, EQUIPMENT AND INTANGIBLES  

E-Print Network [OSTI]

.2 Capitalisation Policy 10 6.3 Capital Expenditure types (Capex) 11 6.4 Acquisitions ­ process and account coding Verification Report Capex Capital expenditure and includes major refurbishments. Capitalised equipment Items

University of Technology, Sydney

216

Disposition of Equipment Upon a Faculty Member's Departure  

E-Print Network [OSTI]

To transfer equipment upon termination, the employee must submit a written request to his/her Department Head above, the employee must propose a plan for trade or purchase. Upon Department Head approval

217

Identify Petroleum Reduction Strategies for Vehicles and Mobile Equipment  

Broader source: Energy.gov [DOE]

As defined by the Federal Energy Management Program (FEMP), greenhouse gas (GHG) emission reduction strategies for Federal vehicles and equipment are based on the three driving principles of petroleum reduction: Reduce vehicle miles traveled Improve fuel efficiency Use alternative fuels.

218

Treatment options for tank farms long-length contaminated equipment  

SciTech Connect (OSTI)

This study evaluated a variety of treatment and disposal technologies for mixed waste (MW) meeting the following criteria: 1. Single-Shell and Double-Shell Tank System (tank farms) equipment and other debris; 2. length greater than 12 feet; and contaminated with listed MW from the tank farms. This waste stream, commonly referred to as tank farms long-length contaminated equipment (LLCE), poses a unique and costly set of challenges during all phases of the waste management lifecycle.

Josephson, W.S.

1995-10-16T23:59:59.000Z

219

Security officer tactical training issues involving ESS equipment  

SciTech Connect (OSTI)

Security officer tactical training issues are discussed in relation to the possible implementation of the Tactical Improvement Package (TIP), utilizing the Engagement Simulation System (ESS) equipment, by nuclear power plant licensees for security officer tactical training. The ESS equipment provides the capability to simulate engagement conditions between adversaries armed with weapons which have harmless laser transmitters. A brief discussion of the TIP is presented, along with some concerns and considerations in the use of the TIP.

Rountree, S.L.K.

1984-01-01T23:59:59.000Z

220

Field Labeling to Ensure the Electrical Safety of Production Equipment  

E-Print Network [OSTI]

not including equipment that is designed for use in hazardous locations. This publication provides compressive information on how to apply electrical components, wiring and control systems to both ensure safety of personnel and aid in the delivery..., by delivering safe products at a reasonable price a company will not be eliminated as a potential equipment supplier by being viewed in a negative light as a result of a poor safety evaluation. OSHA posts information on their website detailing the number...

Mills, Todd

2012-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

WHAT IS MEDICAL MINERALOGY AND GEOCHEMISTRY?  

E-Print Network [OSTI]

WHAT IS MEDICAL MINERALOGY AND GEOCHEMISTRY? The connection between human health of medical mineralogy and geochemistry (MMG) focuses on understanding the equilibria and reaction pathways phases with naturally occurring, inorganic solid phases within the human body. Medical mineralogy

Sahai, Nita

222

Development of unique ISI equipment for an RPV  

SciTech Connect (OSTI)

A cooperative effort involving the Japan Atomic Power Company (JAPC) and Hitachi Ltd. has provided unique automated ultrasonic testing equipment for the reactor pressure vessel (RPV) of JAPC's Tsuruga unit 1, which is a 357-MW (electric) non-jet-pumped boiling water reactor. Using this equipment package at the 20th scheduled outage of Tsuruga unit 1, the in-service inspection (ISI) performed in accordance with Japanese ISI standard JEAC 4205 (similar to ASME Sec. XI) was successfully completed. Through this field application, the capability and reliability of this equipment have been verified. Tsuruga unit 1 has an RPV that cannot be reached from the outside because of the limited space between the RPV and a biological shield. Therefore, it must be inspected with ID inspection equipment such as that for pressurized water reactors. A major consideration in the design of this new equipment was that it pass an ultrasonic testing head and arm through a very narrow gap between reactor internals and allow precise control from a great distance below the RPV flange (the maximum is {approximately}12m below). The design philosophy focused on how to avoid interference between any reactor internals and the equipment during the operation.

Tokunaga, Katsumi; Aoki, Takayuki (Japan Atomic Power Co., Tsuruga-shi, Fukui (Japan)); Sasaki, Tsukasa (Hitachi Works, Ibaraki (Japan))

1992-01-01T23:59:59.000Z

223

SINGAPORE SESSIONS IS A TRADEMARK OF SINGAPORE EDB Already hard at work in hospitals around the world, medical  

E-Print Network [OSTI]

." acceleraTing change The learning curve for robot-assisted surgery is reportedly shorter than traditional the world, medical robots are enabling surgeons to perform complex operations with much success. Infact, these surgical robots equip doctors with extraordinary precision, providing heightened visual aid, controlled

Stuart, Josh

224

DEDICATED HEAVY ION MEDICAL ACCELERATORS  

E-Print Network [OSTI]

Lancaster, R.B. Yourd, Pre~,Accelerator A wideroe~,Basedcarbon beam medical accelerator facility. N "' . ,;j "' ::lEat the MARIA Workshop III: Accelerator Systems for Relat ic

Gough, R.A.

2013-01-01T23:59:59.000Z

225

Medical and Biohazardous Waste Generator's Guide (Revision 2)  

E-Print Network [OSTI]

Waste Supplies 8. Solid Medical Waste Disposal ProceduresMedical/Biohazardous Waste Pickup Containers Solid Medical/Security Notice 8. Solid Medical Waste Disposal Procedures

Waste Management Group

2006-01-01T23:59:59.000Z

226

Tensiometer, drive probe for use with environmental testing equipment, and methods of inserting environmental testing equipment into a sample  

DOE Patents [OSTI]

A method of inserting a tensiometer into a sample, comprises providing a drive probe configured to be engaged by direct push equipment; supporting a porous member from the drive probe; and driving the drive probe into the sample using a cone penetrometer. A tensiometer comprises a drive probe configured to be engaged by direct push equipment or a cone penetrometer; a porous member supported by the drive probe; and a pressure sensor in pressure sensing relation to the porous member.

Hubbell, Joel M.; Sisson, James B.

2005-07-26T23:59:59.000Z

227

UC SANTA BARBARA POLICY AND PROCEDURE Reporting the Loss or Theft of Inventorial Equipment  

E-Print Network [OSTI]

UC SANTA BARBARA POLICY AND PROCEDURE Reporting the Loss or Theft of Inventorial Equipment Contact OF INVENTORIAL EQUIPMENT Table of Contents Sections Page I Scope....................................................................................... ..3 V. Procedure for Reporting Theft of Inventorial Equipment ............................. ..3 VI

Bigelow, Stephen

228

Defect Prevention and Detection in Software for Automated Test Equipment  

SciTech Connect (OSTI)

Software for automated test equipment can be tedious and monotonous making it just as error-prone as other software. Active defect prevention and detection are also important for test applications. Incomplete or unclear requirements, a cryptic syntax used for some test applicationsespecially script-based test sets, variability in syntax or structure, and changing requirements are among the problems encountered in one tester. Such problems are common to all software but can be particularly problematic in test equipment software intended to test another product. Each of these issues increases the probability of error injection during test application development. This report describes a test application development tool designed to address these issues and others for a particular piece of test equipment. By addressing these problems in the development environment, the tool has powerful built-in defect prevention and detection capabilities. Regular expressions are widely used in the development tool as a means of formally defining test equipment requirements for the test application and verifying conformance to those requirements. A novel means of using regular expressions to perform range checking was developed. A reduction in rework and increased productivity are the results. These capabilities are described along with lessons learned and their applicability to other test equipment software. The test application development tool, or application builder, is known as the PT3800 AM Creation, Revision and Archiving Tool (PACRAT).

E. Bean

2006-11-30T23:59:59.000Z

229

The Imaging and Medical Beam Line at the Australian Synchrotron  

SciTech Connect (OSTI)

As a result of the enthusiastic support from the Australian biomedical, medical and clinical communities, the Australian Synchrotron is constructing a world-class facility for medical research, the 'Imaging and Medical Beamline'. The IMBL began phased commissioning in late 2008 and is scheduled to commence the first clinical research programs with patients in 2011. It will provide unrivalled x-ray facilities for imaging and radiotherapy for a wide range of research applications in diseases, treatments and understanding of physiological processes. The main clinical research drivers are currently high resolution and sensitivity cardiac and breast imaging, cell tracking applied to regenerative and stem cell medicine and cancer therapies. The beam line has a maximum source to sample distance of 136 m and will deliver a 60 cm by 4 cm x-ray beam1 - monochromatic and white - to a three storey satellite building fully equipped for pre-clinical and clinical research. Currently operating with a 1.4 Tesla multi-pole wiggler, it will upgrade to a 4.2 Tesla device which requires the ability to handle up to 21 kW of x-ray power at any point along the beam line. The applications envisaged for this facility include imaging thick objects encompassing materials, humans and animals. Imaging can be performed in the range 15-150 keV. Radiotherapy research typically requires energies between 30 and 120 keV, for both monochromatic and broad beam.

Hausermann, Daniel; Hall, Chris; Maksimenko, Anton; Campbell, Colin [Australian Synchrotron Company, 800 Blackburn Road, Clayton, Victoria 3168 (Australia)

2010-07-23T23:59:59.000Z

230

E-Print Network 3.0 - ancillary equipment unit Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pumps - Vaporizers - Ancillaries 2... May 8, 2007 Jerry Gillette Large-Scale Liquid Hydrogen Handling Equipment Hydrogen Delivery... - Scale Liquid Hydrogen Handling Equipment...

231

E-Print Network 3.0 - automatic test equipment Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(NIST), Ceramics Division Collection: Materials Science 97 Safe Operating Procedure LOCKOUTTAGOUT FOR MACHINES & EQUIPMENT Summary: re-energize a machine equipment that is...

232

Interstate Power and Light (Alliant Energy)- Farm Equipment Energy Efficiency Incentives  

Broader source: Energy.gov [DOE]

Alliant Energy offers prescriptive rebates for a variety of energy efficient products for agricultural customers. These include irrigation equipment, dairy equipment, ventilation systems,...

233

A STUDY OF AGGREGATION BIAS IN ESTIMATING THE MARKET FOR HOME HEATING AND COOLING EQUIPMENT  

E-Print Network [OSTI]

Estimating the Market for Home Heating and Cooling EquipmentFuel and Technology Choice in Home Heating and Cooling," LBLTHE MARKET FOR HOME HEATING AND COOLING EQUIPMENT* David

Wood, D.J.

2010-01-01T23:59:59.000Z

234

E-Print Network 3.0 - automated test equipment Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and equipment tracking data using bar codes and sensors, as well as automated... of production lots between equipment bays using ... Source: Hodges, David A. - Department of...

235

E-Print Network 3.0 - advanced electronic equipment Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

computer equipment. DUTIES Typical: Learns how and assists with on-site and off... -site troubleshooting, repair, and upgrade on microcomputer equipment to include interpretation...

236

Load Component Database of Household Appliances and Small Office Equipment  

SciTech Connect (OSTI)

This paper discusses the development of a load component database for household appliances and office equipment. To develop more accurate load models at both transmission and distribution level, a better understanding on the individual behaviors of home appliances and office equipment under power system voltage and frequency variations becomes more and more critical. Bonneville Power Administration (BPA) has begun a series of voltage and frequency tests against home appliances and office equipments since 2005. Since 2006, Researchers at Pacific Northwest National Laboratory has collaborated with BPA personnel and developed a load component database based on these appliance testing results to facilitate the load model validation work for the Western Electricity Coordinating Council (WECC). In this paper, the testing procedure and testing results are first presented. The load model parameters are then derived and grouped. Recommendations are given for aggregating the individual appliance models to feeder level, the models of which are used for distribution and transmission level studies.

Lu, Ning; Xie, YuLong; Huang, Zhenyu; Puyleart, Francis; Yang, Steve

2008-07-24T23:59:59.000Z

237

Argentine drilling equipment to go on auction block  

SciTech Connect (OSTI)

Yacimientos Petroliferos Fiscales (YPF) is preparing to sell all state owned drilling rigs and related assets as part of a plan to privatize Argnetina's oil and gas industry. YPF expects to offer the equipment to private companies by summer in a sealed bid auction in Buenos Aires. More than 30 mostly late model U.S. and Romanian rigs rated to 1,800-7,000 m will be included in the sale. Drilling contracts covering all major Argentina exploration areas will be offered with many of the rigs being sold. This paper reports that the YPF sale will include well completion units, drill pipe and collars, large equipment yards, shops, and warehouses, and possibly the largest inventory of fishing tools in South America, says a company helping to organize the sale. YPF will set up a data room in Buenos Aires to provide information about drilling, conditions, rigs and equipment, and other assets.

Not Available

1992-04-27T23:59:59.000Z

238

Equipment decontamination: A brief survey of the DOE complex  

SciTech Connect (OSTI)

Deactivation at DOE facilities has left a tremendous amount of contaminated equipment behind. In-situ methods are needed to decontaminate the interiors of the equipment sufficiently to allow either free release or land disposal. A brief survey was completed of the DOE complex on their needs for equipment decontamination with in-situ technology to determine (1) the types of contamination problems within the DOE complex, (2) decontamination processes that are being used or are being developed within the DOE, and (3) the methods that are available to dispose of spent decontamination solutions. In addition, potential sites for testing decontamination methods were located. Based on the information obtained from these surveys, the Rocky Flats Plant and the Idaho National Engineering Laboratory appear to be best suited to complete the initial testing of the decontamination processes.

Conner, C.; Chamberlain, D.B; Chen, L.; Vandegrift, G.F.

1995-03-01T23:59:59.000Z

239

Seismic analyses of equipment in 2736-Z complex. Revision 1  

SciTech Connect (OSTI)

This report documents the structural qualification for the existing equipment when subjected to seismic loading in the Plutonium Storage Complex. It replaces in entirety Revision 0 and reconciles the U.S. Department of Energy (DOE) comments on Revision 0. The Complex consists of 2736-Z Building (plutonium storage vault), 2736-ZA Building (vault ventilation equipment building), and 2736-ZB Building (shipping/receiving, repackaging activities). The existing equipment structurally qualified in this report are the metal storage racks for 7 inch and lard cans in room 2 of Building 2736-Z; the cubicles, can holders and pedestals in rooms 1, 3, and 4 of Building 2736-Z; the ventilation duct including exhaust fans/motors, emergency diesel generator, and HEPA filter housing in Building 2736-ZA; the repackaging glovebox in Building 2736-ZB; and the interface duct between Buildings 2736-Z and 2736-ZA.

Ocoma, E.C.

1995-04-01T23:59:59.000Z

240

Oil-field equipment in Romania. Export trade information  

SciTech Connect (OSTI)

The Industry Sector Analyses (I.S.A.) for oil field equipment contains statistical and narrative information on projected market demand, end-users, receptivity of Romanian consumers to U.S. products, the competitive situation - Romanian production, total import market, U.S. market position, foreign competition, and competitive factors, and market access - Romanian tariffs, non-tariff barriers, standards, taxes and distribution channels. The I.S.A. provides the United States industry with meaningful information regarding the Romanian market for oil field equipment.

Tinis, R.

1991-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Equipment qualification issues research and resolution: Status report  

SciTech Connect (OSTI)

Since its inception in 1975, the Qualification Testing Evaluation (QTE) Program has produced numerous results pertinent to equipment qualification issues. Many have been incorporated into Regulatory Guides, Rules, and industry practices and standards. This report summarizes the numerous reports and findings to date. Thirty separate issues are discussed encompassing three generic areas: accident simulation methods, aging simulation methods, and special topics related to equipment qualification. Each issue-specific section contains (1) a brief description of the issue, (2) a summary of the applicable research effort, and (3) a summary of the findings to date.

Bonzon, L.L.; Wyant, F.J.; Bustard, L.D.; Gillen, K.T.

1986-11-01T23:59:59.000Z

242

Guide to good practices for equipment and piping labeling  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Equipment and Piping Labeling, Chapter XVIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing labeling programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Equipment and Piping Labeling is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated labeling program to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

243

Studies and research concerning BNFP: cask handling equipment standardization  

SciTech Connect (OSTI)

This report covers the activities of one of the sub-tasks within the Spent LWR Fuel Transportation Receiving, Handling, and Storage program. The sub-task is identified as Cask Handling Equipment Standardization. The objective of the sub-task specifies: investigate and identify opportunities for standardization of cask interface equipment. This study will examine the potential benefits of standardized yokes, decontamination barriers and special tools, and, to the extent feasible, standardized methods and software for handling the variety of casks presently available in the US fleet. The result of the investigations is a compilation of reports that are related by their common goal of reducing cask turnaround time.

McCreery, Paul N.

1980-10-01T23:59:59.000Z

244

Remote control of off-shore oil field production equipment  

E-Print Network [OSTI]

REMOTE CONTROL OF OFF-SHORE OIL FIELD PRODUCTION EQUIPMENT A Thesis Alton W. Sissom 1949 Approve as to style and on n by Cha1rman of omm1ttee REMOTE CONTROL OF OFFSHORE OIL FIELD PRODUCTION EQUIPMENT A Thesis Alton W. Oissom 1949 REMOTE...-Carrier Channel 26 PZNOTE CONTROL OF OFF-SHORE OIL FIELD PRODUCTION K, 'UIPMENT I GENERAL IiPOPPUi TION Since the beginning of the exploitation of the under-sea oil deposits in the Gulf' of qexico, most, of the territory off the shores of Texas and Louisiana...

Sissom, Alton Wayne

2012-06-07T23:59:59.000Z

245

Microsoft Word - Equipment Use Policy Oct2710.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMappingENVIRONMENTAL IMPACTApproved:GEORGEICReduced Form SSRL0Equipment

246

Medical Guidelines Reconciling Medical Software and Electronic Devices: Imatinib Case-study  

E-Print Network [OSTI]

Medical Guidelines Reconciling Medical Software and Electronic Devices: Imatinib Case-study Alena as specification of a medical system that includes both software and electronic devices. However, often medical GLs. INTRODUCTION Recently, the set of electronic medical devices has a tendency to be extended with a new class

De Micheli, Giovanni

247

Operating Experience Level 3, Industrial Equipment Impacts Infrastructure  

Broader source: Energy.gov [DOE]

This Operating Experience Level 3 (OE-3) document provides information on a safety concern related to heavy industrial equipment that contacts and damages structures and electrical, gas, and water lines. Although these contacts did not cause injuries, the events did impact mission and schedule, divert resources, and change momentum.

248

UF{sub 6} cylinder lifting equipment enhancements  

SciTech Connect (OSTI)

This paper presents numerous enhancements that have been made to the Portsmouth lifting equipment to ensure the safe handling of cylinders containing liquid uranium hexafluoride (UF{sub 6}). The basic approach has been to provide redundancy to all components of the lift path so that any one component failure would not cause the load to drop or cause any undesirable movement.

Hortel, J.M. [Martin Marietta Energy Systems, Inc., Piketon, OH (United States)

1991-12-31T23:59:59.000Z

249

Camera Equipped Robotic Arm Giancarlo Valentn & Michael Arpin  

E-Print Network [OSTI]

Camera Equipped Robotic Arm Giancarlo Valentín & Michael Arpin #12;Overview: Use USB camera with the ebox to detect objects in the vicinity of the robot arm. If an object of a predetermined type is detected (e.g. red ball) it should be picked up by the arm and move to a designated location. Materials: 1

Hamblen, James

250

Giancarlo Valentn & Michael Arpin Camera Equipped Robotic Arm  

E-Print Network [OSTI]

Giancarlo Valentín & Michael Arpin Camera Equipped Robotic Arm ECE 4180 Fall 2011 #12;Overview #12;Materials: Use USB camera was attached to the ebox to detect objects in the vicinity of the robot arm. If an object of a predetermined type is detected (e.g. red pyramid) it should be picked up by the arm and moved

Hamblen, James

251

Directional drilling and equipment for hot granite wells  

SciTech Connect (OSTI)

The following drilling equipment and experience gained in drilling to date are discussed: positive displacement motors, turbodrills, motor performance experience, rotary-build and rotary-hold results, steering devices and surveying tools, shock absorbers, drilling and fishing jars, drilling bits, control of drill string drag, and control of drill string degradation. (MHR)

Williams, R.E.; Neudecker, J.W.; Rowley, J.C.; Brittenham, T.L.

1981-01-01T23:59:59.000Z

252

Numerical Optimization Methodology for the Design of Power Equipment  

E-Print Network [OSTI]

health effects from overhead power line conductors [6,7]. Even though no conclusive evidence has been of utility companies have been involved in a redesign of their overhead transmission lines to avoid potentialNumerical Optimization Methodology for the Design of Power Equipment Gaurav Tewari* My M. Hua

Mamishev, Alexander

253

Energy spectra and dissipation Mikel Indurain, Equipe Planto  

E-Print Network [OSTI]

Energy spectra and dissipation Mikel Indurain, Equipe Planéto LMD LMDZ.EARTH LMDZ.GENERIC LMDZ.MARS #12;Dissipation : introduction Energy transfer from large scales to small scales. Problem : energy : introduction Energy transfer from large scales to small scales. Problem : energy accumulation if dissipative

Madeleine, Jean-Baptiste

254

Recent Electrical Events Highlight Equipment-Failure Hazards  

E-Print Network [OSTI]

Recent Electrical Events Highlight Equipment-Failure Hazards FOR DETAILS: Occurrence Reports: NA Investigators: Antonia Tallarico, 665-6988 Mark Hunsinger, 665-1496 Susan Voss, 667-5979 LANL Chief Electrical-OA at 665-0033. February 14, 2007 LANL 2007-0004 GUIDANCE: Resources at hand LIR 402-600-01.3, "Electrical

255

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories?  

E-Print Network [OSTI]

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories? N. D. Finkelstein, K, Boulder Abstract. This paper examines the effects of substituting computer simulations in place of real (DC) circuit laboratory was modified to compare the effects of using computer simulations

Colorado at Boulder, University of

256

Long-length contaminated equipment burial containers fabrication process procedures  

SciTech Connect (OSTI)

These special process procedures cover the detailed step-by-step procedures required by the supplier who will manufacture the Long-Length Contaminated Equipment (LLCE) Burial Container design. Also included are detailed step-by-step procedures required by the disposal process for completion of the LLCE Burial Containers at Hanford.

McCormick, W.A., Fluor Daniel Hanford

1997-03-11T23:59:59.000Z

257

Qualification Testing Evaluation (QTE) program for safety-related equipment  

SciTech Connect (OSTI)

The nuclear power industry is required to demonstrate that certain safety-related equipment is ''qualified'' and will function even in the event of a severe reactor accident. Demonstration of qualification by testing is the preferred approach. International interest in equipment qualification, and its recognition as being paramount to safety, is rapidly increasing, with most major supplier-countries developing sophisticated qualification testing facilities. An aspect of the demonstration of qualification is to assure that the qualification testing applied to safety-related equipment is both realistic and conservative; that is, a program of qualification methodology assessment and improvement is imperative. In the United States, the Nuclear Regulatory Commission (NRC) is sponsoring the Qualification Testing Evaluation Program with the goal of obtaining data that will confirm or improve the technical bases for equipment qualification programs. This multi-task Program has long-term, continuing objectives, but recent new results have been obtained and these results are being incorporated into NRC regulations with attendant impact on the nuclear industry. 19 refs. (JDB)

Bonzon, L.L.; Gillen, K.T.; Clough, R.L.; Salazar, E.A.; Buckalew, W.H.; Thome, F.V.; Stuetzer, O.M.; Feit, R.

1980-01-01T23:59:59.000Z

258

PMR2088B September 2012 FOURTYPES OF EQUIPMENT FOR SAFETY  

E-Print Network [OSTI]

, and falling debris, and tools. Made of lightweight fire resistant material. Goggles $25 ­ $100 Protect against Resistant Shirt and Pants $70 ­ $300 Absorb heat and resist burning and melting; Nomex or Indura Cotton burns to occur. Personal protective equipment (PPE), protects workers from thermal and other hazards

Koford, Rolf R.

259

Predicting the Operational Effectiveness of Aircraft Survivability Equipment Suite  

E-Print Network [OSTI]

, and experiment with their autonomous decision-making against threats in various electronic warfare settings. We: Autonomous Decision-Making, Electronic Warfare Settings, Aircraft Survivability Equipment Suite, Operational Effectiveness 1. Introduction In order to counter threats in electronic warfare environments, a command

Noh, Sanguk

260

Improved Biomass Cooking Stoves and Improved Stove Emission Equipment  

SciTech Connect (OSTI)

In developing countries, there is an urgent need for access to safe, efficient, and more affordable cooking technologies. Nearly 2.5 billion people currently use an open fire or traditional cookstove to prepare their meals, and recent models predict that use of biomass for cooking will continue to be the dominant energy use in rural, resource-poor households through 2030. For these families, cooking poses serious risks to health, safety, and income. An alarming 4 million people, primarily women and children, die prematurely each year from indoor and outdoor exposure to the harmful emissions released by solid fuel combustion. Use of traditional stoves can also have a significant impact on deforestation and climate change. This dire situation creates a critical need for cookstoves that significantly and verifiably reduce fuel use and emissions in order to reach protective levels for human health and the environment. Additionally, advances in the scientific equipment needed to measure and monitor stove fuel use and emissions have not kept pace with the significant need within the industry. While several testing centers in the developed world may have hundred thousand-dollar emissions testing systems, organizations in the field have had little more than a thermometer, a scale, and subjective observations to quantify the performance of stove designs. There is an urgent need for easy-to-use, inexpensive, accurate, and robust stove testing equipment for use by laboratory and field researchers around the world. ASAT and their research partner, Aprovecho Research Center (ARC), have over thirty years of experience addressing these two needs, improved cookstoves and emissions monitoring equipment, with expertise spanning the full spectrum of development from conceptual design to product manufacturing and dissemination. This includes: 1) research, design, and verification of clean biomass cookstove technology and emissions monitoring equipment; 2) mass production of quality-controlled stove and emissions equipment at levels scalable to meet global demand; and 3) global distribution through a variety of channels and partners. ARC has been instrumental in designing and improving more than 100 stove designs over the past thirty years. In the last four years, ASAT and ARC have played a key role in the production and sales of over 200,000 improved stoves in the developed and developing world. The ARC-designed emissions equipment is currently used by researchers in laboratories and field studies on five continents. During Phase I of the DOE STTR grant, ASAT and ARC worked together to apply their wealth of product development experience towards creating the next generation of improved cookstoves and emissions monitoring equipment. Highlights of Phase I for the biomass cookstove project include 1) the development of several new stove technologies that reached the DOE 50/90 benchmark; 2) fabrication of new stove prototypes by ASATs manufacturing partner, Shengzhou Stove Manufacturing (SSM); 3) field testing of prototype stoves with consumers in Puerto Rico and the US; and 4) the selection of three stove prototypes for further development and commercialization during Phase II. Highlights of Phase I for the emissions monitoring equipment project include: 1) creation of a new emissions monitoring equipment product, the Laboratory Emissions Monitoring System (LEMS 2) the addition of gravimetric PM measurements to the stove testing systems to meet International Standards Organization criteria; 3) the addition of a CO{sub 2} sensor and wireless 3G capability to the IAP Meter; and 4) and the improvement of sensors and signal quality on all systems. Twelve Regional Testing and Knowledge Centers purchased this equipment during the Phase I project period.

HATFIELD, MICHAEL; Still, Dean

2013-04-15T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

The Academy Harvard Medical School  

E-Print Network [OSTI]

The Academy Harvard Medical School Annual Report 2011 - 2012 #12;#12;To the HMS Community In many ways, academic year 2012 was the "Year of Critical Thinking" for the HMS Academy. Critical thinking and practice. When all of the Academy professional development programs are taken together, par- ticipation

Paulsson, Johan

262

DIESEL/HEAVY The diesel/heavy equipment certificate offers training in maintenance  

E-Print Network [OSTI]

DIESEL/HEAVY EQUIPMENT The diesel/heavy equipment certificate offers training in maintenance and repair of heavy equipment and trucks. Students will learn to work on electrical and air systems, diesel Small Engines Automotive Maintenance Welding Training for entry level heavy diesel equipment

Ickert-Bond, Steffi

263

Electricity Used by Office Equipment and Network Equipment in the U.S. Kaoru Kawamoto, Jonathan G. Koomey, Bruce Nordman,  

E-Print Network [OSTI]

on Energy Efficiency in Buildings, Asilomar, CA. http://enduse.lbl.gov/Projects/InfoTech.html August 2000 consumption for residential, commercial and industrial use by combining estimates of stock, power requirements than 70% of this energy use is dedicated to office equipment for commercial use. We also found

264

Medical implants and methods of making medical implants  

DOE Patents [OSTI]

A medical implant device having a substrate with an oxidized surface and a silane derivative coating covalently bonded to the oxidized surface. A bioactive agent is covalently bonded to the silane derivative coating. An implantable stent device including a stent core having an oxidized surface with a layer of silane derivative covalently bonded thereto. A spacer layer comprising polyethylene glycol (PEG) is covalently bonded to the layer of silane derivative and a protein is covalently bonded to the PEG. A method of making a medical implant device including providing a substrate having a surface, oxidizing the surface and reacting with derivitized silane to form a silane coating covalently bonded to the surface. A bioactive agent is then covalently bonded to the silane coating. In particular instances, an additional coating of bio-absorbable polymer and/or pharmaceutical agent is deposited over the bioactive agent.

Shaw, Wendy J; Yonker, Clement R; Fulton, John L; Tarasevich, Barbara J; McClain, James B; Taylor, Doug

2014-09-16T23:59:59.000Z

265

Survey of Canadian new household equipment purchases, 1994 and 1995: Statistical report  

SciTech Connect (OSTI)

This report reviews results of two surveys that collected information on household equipment: The 1994 and 1995 Household Equipment Surveys. The goal of this report is to present the features of energy-consuming equipment bought by Canadian households in 1994 and 1995. Data on equipment features are presented by type of equipment: Refrigerators, ranges, dishwashers, freezers, washers, dryers, air conditioners, heating systems, and water heaters. The appendix contains information on survey methodology and a copy of the survey questionnaire.

Not Available

1997-01-01T23:59:59.000Z

266

Medical surveillance and programs on industrial hygiene at RCRA facilities  

SciTech Connect (OSTI)

Some special areas where much progress in industrial hygiene and safety has been made in the past few years are; training, personal protective equipment, uniforms, personal monitoring, area monitoring, and medical surveillance. Before one can begin to construct programs for worker protection, some knowledge of potential exposures must be gained. The best place to start is the Waste Analysis Plan, and the list of wastes that a particular site is authorized to receive. Waste Codes are listed within a facility`s Part A and Part B permits. Actual facility receipt of wastes are well documented within Load Records and other documentation. A facility`s training program forms the heart of a health and safety program. Every TSD facility should have developed a matrix of job titles and required training. Every facility must also make a commitment to providing a wide range of personal protective equipment, including a wide array of disposables. Some facilities will benefit from the occasional use of the newer respirator quantitative fit-testing devices. All facilities are urged to rent or borrow this type of equipment periodically. Quantitative respirator fit-testers are capable of revealing important deficiencies in a respirator program. Providing uniforms is a newer means of protecting workers. The use of uniforms is an effective means for addressing the idea of carry-home-waste. The use of disposables including boots, must be integrated into a Uniform Program if the program is to be effective. In addition, employees must strictly understand that uniforms must not leave the facility at any time, including lunch time.

Murphy, T.E. [Ash Grove Cement Co., Overland Park, KS (United States)

1994-12-31T23:59:59.000Z

267

Medical Surveillance for Former Workers  

SciTech Connect (OSTI)

The Former Hanford Worker Medical Monitoring Program, directed by the Occupational and Environmental Medicine Program at the University of Washington, served former production and other non-construction workers who were potentially exposed to workplace hazards while working for the USDOE or its contractors at Hanford. The USDOE Former Workers Program arose from Congressional action in the Defense Authorization of 1993 (Public Law 102). Section 3162 stated that, The Secretary shall establish and carry out a program for the identification and ongoing medical evaluation of current and former Department of Energy employees who are subject to significant health risks as a result of exposure of such employees to hazardous or radioactive substances during such employment. (This also covers former employees of USDOE contractors and subcontractors.) The key objective has been to provide these former workers with medical evaluations in order to determine whether workers have experienced significant risk due to workplace exposure to hazards. Exposures to asbestos, beryllium, and noise can produce specific medical conditions: asbestosis, berylliosis, and noise-induced hearing loss (NIHL). Each of these conditions can be identified by specific, non-invasive screening tests, which are widely available. Treatments are also available for individuals affected by these conditions. This project involved two phases. Phase I involved a needs and risk assessment, characterizing the nature and extent of workplace health hazards which may have increased the risk for long-term health effects. We categorized jobs and tasks by likelihood of exposures to specific workplace health hazards; and located and established contact with former Hanford workers. Phase II involved implementation of medical monitoring programs for former workers whose individual work history indicated significant risk for adverse health effects. We identified 118,000 former workers, employed from 1943 to 1997. After excluding current workers, construction workers, and deceased workers, the total estimated number of former workers eligible for screening was 72,611. By September, 2006, 53,010 workers had been contacted, 20,298 responded, 2,835 were eligible and authorized, and 2,773 workers were ultimately screened. The cohort was 80% male, 85% white, and had a mean age of 63 years (range 24-96 years) at the time of first exam. Participants completed an occupational health history survey prior to the medical exam. Former Hanford workers were considered eligible for an exam if they reported exposure to asbestos, beryllium, or noise, or if a review of their Hanford work history indicated possible or probable exposure to one of these three hazards. We also invited any former Hanford worker who requested an exam to participate, regardless of documentation of exposure. The screening exam included a problem-focused physical exam, along with screening tests for one or more of three specific medical conditions: asbestosis (chest X-ray and spirometry), berylliosis (chest X-ray, spirometry, and beryllium-induced lymphocyte proliferation test), and NIHL (audiometry). We assisted ill workers in filing appropriate workers compensation claims, and facilitated appropriate follow-up medical care. This program has made an important contribution to the health of former DOE contractor workers at the Hanford defense nuclear site.

Tim Takaro

2009-05-29T23:59:59.000Z

268

Los Alamos National Laboratory medical  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6,LocalNuclearand LANSdescribesMay 14,marks 20

269

Page 1 DePaul/Cinespace Equipment Reservation Sheet  

E-Print Network [OSTI]

head travel case 150.00$ 4 1x1 AB Gold Mount Adapter Plate 155.00$ 4 Anton Bauer Dionic 90 Battery 412.25$ 1 Anton Bauer TWQ 4-Battery Charger 1,156.00$ #12;Page 2 DePaul/Cinespace Equipment Reservation-D4-120 1,205.00$ 2 Diva-Lite 201 KIT-D2-120 881.00$ 6 Extra 25' 4 Bank Extensions 108.00$ 6 Extra 25

Schaefer, Marcus

270

Guide to good practices for equipment and piping labeling  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Equipment and Piping Labeling, Chapter XVIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities.'' The practices in this guide should be considered when planning or reviewing labeling programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19.

Not Available

1993-06-01T23:59:59.000Z

271

Guide to good practices for equipment and piping labeling  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Equipment and Piping Labeling, Chapter XVIII of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities.`` The practices in this guide should be considered when planning or reviewing labeling programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19.

Not Available

1993-06-01T23:59:59.000Z

272

In-Place Cleaning of Milk Pasteurizing Equipment.  

E-Print Network [OSTI]

proced- ure. In the study reported in this bulletin the critical part of the vat system used for pasteuri- zation was the preheater in which the tempera- ture gradient was high enough to cause a milk stone deposit. In-place cleaning and sanitizing... . In heated equipment surfaces. Such films been referred to for many years as "milk - = '7 Following the cleaning process, there I- ,, be a sanitizing treatment that will insure " limum of bacteriological contamination in ;/ - icceeding milk processed...

Potter, F. E.; Moore, A. V.

1953-01-01T23:59:59.000Z

273

Explosion Clad for Upstream Oil and Gas Equipment  

SciTech Connect (OSTI)

Today's upstream oil and gas facilities frequently involve the combination of high pressures, high temperatures, and highly corrosive environments, requiring equipment that is thick wall, corrosion resistant, and cost effective. When significant concentrations of CO{sub 2} and/or H{sub 2}S and/or chlorides are present, corrosion resistant alloys (CRA) can become the material of choice for separator equipment, piping, related components, and line pipe. They can provide reliable resistance to both corrosion and hydrogen embrittlement. For these applications, the more commonly used CRA's are 316L, 317L and duplex stainless steels, alloy 825 and alloy 625, dependent upon the application and the severity of the environment. Titanium is also an exceptional choice from the technical perspective, but is less commonly used except for heat exchangers. Explosion clad offers significant savings by providing a relatively thin corrosion resistant alloy on the surface metallurgically bonded to a thick, lower cost, steel substrate for the pressure containment. Developed and industrialized in the 1960's the explosion cladding technology can be used for cladding the more commonly used nickel based and stainless steel CRA's as well as titanium. It has many years of proven experience as a reliable and highly robust clad manufacturing process. The unique cold welding characteristics of explosion cladding reduce problems of alloy sensitization and dissimilar metal incompatibility. Explosion clad materials have been used extensively in both upstream and downstream oil, gas and petrochemical facilities for well over 40 years. The explosion clad equipment has demonstrated excellent resistance to corrosion, embrittlement and disbonding. Factors critical to insure reliable clad manufacture and equipment design and fabrication are addressed.

Banker, John G. [Dynamic Materials Corp., 5405 Spine Rd., Boulder, CO 80301 (United States); Massarello, Jack [Global Metallix, Consultant to DMC, 5405 Spine Rd., Boulder, CO 80301 (United States); Pauly, Stephane [DMC., Nobelclad Business Unit, 1 Allee Alfred NOBEL, 66600 Rivesaltes (France)

2011-01-17T23:59:59.000Z

274

Recovery Act: Training Program Development for Commercial Building Equipment Technicians  

SciTech Connect (OSTI)

The overall goal of this project has been to develop curricula, certification requirements, and accreditation standards for training on energy efficient practices and technologies for commercial building technicians. These training products will advance industry expertise towards net-zero energy commercial building goals and will result in a substantial reduction in energy use. The ultimate objective is to develop a workforce that can bring existing commercial buildings up to their energy performance potential and ensure that new commercial buildings do not fall below their expected optimal level of performance. Commercial building equipment technicians participating in this training program will learn how to best operate commercial buildings to ensure they reach their expected energy performance level. The training is a combination of classroom, online and on-site lessons. The Texas Engineering Extension Service (TEEX) developed curricula using subject matter and adult learning experts to ensure the training meets certification requirements and accreditation standards for training these technicians. The training targets a specific climate zone to meets the needs, specialized expertise, and perspectives of the commercial building equipment technicians in that zone. The combination of efficient operations and advanced design will improve the internal built environment of a commercial building by increasing comfort and safety, while reducing energy use and environmental impact. Properly trained technicians will ensure equipment operates at design specifications. A second impact is a more highly trained workforce that is better equipped to obtain employment. Organizations that contributed to the development of the training program include TEEX and the Texas Engineering Experiment Station (TEES) (both members of The Texas A&M University System). TEES is also a member of the Building Commissioning Association. This report includes a description of the project accomplishments, including the course development phases, tasks associated with each phase, and detailed list of the course materials developed. A summary of each year's activities is also included.

Leah Glameyer

2012-07-12T23:59:59.000Z

275

Limited Personal Use of Government Office Equipment including Information Technology  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes requirements and assigns responsibilities for employees' limited personal use of Government resources (office equipment and other resources including information technology) within DOE, including NNSA. The Order is required to provide guidance on appropriate and inappropriate uses of Government resources. This Order was certified 04/23/2009 as accurate and continues to be relevant and appropriate for use by the Department. Certified 4-23-09. No cancellation.

2005-01-07T23:59:59.000Z

276

Appliance and Equipment Standards Program | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles » Alternative FuelNewsWashington AutoYourAppliance and Equipment

277

Adaptive Optimization of Central Chiller Plant Equipment Sequencing  

E-Print Network [OSTI]

and outside air conditions and it insures that the central refrigeration system operates with the lowest possible energy cost at all times. PROBLEM BACKGROUND The specific industrial plant for which the control algorithm was developed is the Texas... was developed to select the optimal sequence of central refrigeration equipment (chillers, cooling towers, pumps) to operate in an industrial plant. The control algorithm adapts the optimal equipaent sequence to reflect changes in the plant's cooling load...

Fiorino, D. P.; Priest, J. W.

278

Medical ice slurry production device  

DOE Patents [OSTI]

The present invention relates to an apparatus for producing sterile ice slurries for medical cooling applications. The apparatus is capable of producing highly loaded slurries suitable for delivery to targeted internal organs of a patient, such as the brain, heart, lungs, stomach, kidneys, pancreas, and others, through medical size diameter tubing. The ice slurry production apparatus includes a slurry production reservoir adapted to contain a volume of a saline solution. A flexible membrane crystallization surface is provided within the slurry production reservoir. The crystallization surface is chilled to a temperature below a freezing point of the saline solution within the reservoir such that ice particles form on the crystallization surface. A deflector in the form of a reciprocating member is provided for periodically distorting the crystallization surface and dislodging the ice particles which form on the crystallization surface. Using reservoir mixing the slurry is conditioned for easy pumping directly out of the production reservoir via medical tubing or delivery through other means such as squeeze bottles, squeeze bags, hypodermic syringes, manual hand delivery, and the like.

Kasza, Kenneth E. (Palos Park, IL); Oras, John (Des Plaines, IL); Son, HyunJin (Naperville, IL)

2008-06-24T23:59:59.000Z

279

Technology transfer equipment qualification methodology for shelf life determination  

SciTech Connect (OSTI)

Discussions with a number of Nuclear Utilities revealed that equipment qualified for 10 to 40 years in the harsh environment of the plant was being assigned shelf lives of only 5 to 10 years in the benign environment of the warehouse, and then the materials were being trashed. One safety-related equipment supplier was assigning a 10-year qualified life, from date of shipment, with no recognition of the difference in the aging rate in the plant vs. that in the warehouse. Many suppliers assign shelf lives based on product warranty considerations rather than actual product degradation. An EPRI program was initiated to evaluate the methods used to assign shelf lives and to adapt the Arrhenius methodology, used in equipment qualification, to assign technically justifiable shelf lives. Temperature is the main factor controlling shelf life; however, atmospheric pressure, humidity, ultraviolet light, ozone and other atmospheric contaminants were also considered. A list of 70 representative materials was addressed in the program. All of these were found to have shelf lives of 14 years to greater than 60 years, except for 19 items. For 18 of these items, there was no data available except for the manufacturer`s recommendation.

Anderson, J.W. [Wyle Labs., Huntsville, AL (United States)] [Wyle Labs., Huntsville, AL (United States)

1995-08-01T23:59:59.000Z

280

Chemical decontamination of process equipment using recyclable chelating agents  

SciTech Connect (OSTI)

The Babcock and Wilcox Company is performing research and development in the application of chelating chemicals to dissolve uranium compounds and other actinide species from the surfaces of DOE process equipment. A chelating system specific for the removal of uranium and other actinides will be applied to the component selected for full-scale demonstration of the process. After application of the chelating solvent for an appropriate time period, the spent solvent will be removed to a waste processing facility, and the dissolved radioactive contaminants will be precipitated out of the solution. The regenerated chelating solvent will then be available for reuse in the cleaning system, thereby minimizing the amount of secondary waste generated by the process. Phase 1 activity has begun with bench-scale tests in the laboratory, to screen and optimize candidate solvent systems, and will proceed to development of a chemical cleaning process that will be tested in a pilot facility on an actual piece of contaminated equipment. The potential for application of the chelating agent as a foam rather than a liquid will also be investigated. The advantage of foaming application is a reduction of solvent volume requiring eventual treatment. The second phase of this program will be a full-scale demonstration of the developed technology on contaminated process equipment at a DOE site.

Palmer, P.A.

1994-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

biological and medical physics, biomedical engineering  

E-Print Network [OSTI]

biological and medical physics, biomedical engineering For further volumes: http://www.springer.com/series/3740 #12;biological and medical physics, biomedical engineering The fields of biological and medical physics and biomedical engineering are broad, multidisciplinary and dynamic. They lie at the crossroads

Ciesielski, Krzysztof Chris

282

University of Michigan Medical School Overview Introduction  

E-Print Network [OSTI]

University of Michigan Medical School Overview Introduction The University of Michigan opened its. The University of Michigan Medical School was among the first to change the role of the student from passive at the University of Michigan Medical School since the first graduating class of six students in 1851. Today, we

Kirschner, Denise

283

alternative medical treatment: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in methadone patients with HIV. University of California eScholarship Repository Summary: abuse treatment, medical care, and AIDS medications may beMedication coaching Voucher...

284

ORISE: The Medical Basis for Radiation-Accident Preparedness...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Medical Basis for Radiation-Accident Preparedness: Medical Management Proceedings of the Fifth International REACTS Symposium on the Medical Basis for Radiation-Accident...

285

Compact accelerator for medical therapy  

DOE Patents [OSTI]

A compact accelerator system having an integrated particle generator-linear accelerator with a compact, small-scale construction capable of producing an energetic (.about.70-250 MeV) proton beam or other nuclei and transporting the beam direction to a medical therapy patient without the need for bending magnets or other hardware often required for remote beam transport. The integrated particle generator-accelerator is actuable as a unitary body on a support structure to enable scanning of a particle beam by direction actuation of the particle generator-accelerator.

Caporaso, George J.; Chen, Yu-Jiuan; Hawkins, Steven A.; Sampayan, Stephen E.; Paul, Arthur C.

2010-05-04T23:59:59.000Z

286

Feasibility of gas-phase decontamination of gaseous diffusion equipment  

SciTech Connect (OSTI)

The five buildings at the K-25 Site formerly involved in the gaseous diffusion process contain 5000 gaseous diffusion stages as well as support facilities that are internally contaminated with uranium deposits. The gaseous diffusion facilities located at the Portsmouth Gaseous Diffusion Plant and the Paducah Gaseous Diffusion Plant also contain similar equipment and will eventually close. The decontamination of these facilities will require the most cost-effective technology consistent with the criticality, health physics, industrial hygiene, and environmental concerns; the technology must keep exposures to hazardous substances to levels as low as reasonably achievable (ALARA). This report documents recent laboratory experiments that were conducted to determine the feasibility of gas-phase decontamination of the internal surfaces of the gaseous diffusion equipment that is contaminated with uranium deposits. A gaseous fluorinating agent is used to fluorinate the solid uranium deposits to gaseous uranium hexafluoride (UF{sub 6}), which can be recovered by chemical trapping or freezing. The lab results regarding the feasibility of the gas-phase process are encouraging. These results especially showed promise for a novel decontamination approach called the long-term, low-temperature (LTLT) process. In the LTLT process: The equipment is rendered leak tight, evacuated, leak tested, and pretreated, charged with chlorine trifluoride (ClF{sub 3}) to subatmospheric pressure, left for an extended period, possibly > 4 months, while processing other items. Then the UF{sub 6} and other gases are evacuated. The UF{sub 6} is recovered by chemical trapping. The lab results demonstrated that ClF{sub 3} gas at subatmospheric pressure and at {approx} 75{degree}F is capable of volatilizing heavy deposits of uranyl fluoride from copper metal surfaces sufficiently that the remaining radioactive emissions are below limits.

Munday, E.B.; Simmons, D.W.

1993-02-01T23:59:59.000Z

287

Home and Farm Security Machinery and Equipment Identification.  

E-Print Network [OSTI]

degree. More than half of committed in rural America are urglaries, and many farm thefts go unre- pays for rural crime losses? rmer pays for the millions of dollars lost eft of farm machinery. Too often these are simply written off in higher... insurance y equipment replacement, lost work urs and so forth. mers can discourage and minimize y theft from their farms is by providing a law enforcement officers to easily identify Mark all machinery and tools with a tification number (ID). Use...

Nelson, Gary S.

1982-01-01T23:59:59.000Z

288

List of Agricultural Equipment Incentives | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place:KeystoneSolar (Texas) JumpEvent (2)Agricultural Equipment

289

1999 Commercial Buildings Characteristics--End-Use Equipment  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProved Reserves (Billion Cubic Feet)WyomingSquareEnd-Use Equipment Topics: Energy

290

Abatement of Air Pollution: Air Pollution Control Equipment and Monitoring  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchThe Office of FossilMembershipoftheManagementHasdec DCDepartmentEquipment

291

LANSCE | Lujan Center | Sample and Equipment Shipping Instructions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample Environment: Magnet and cryostat systemSample Shipping

292

Lab Equipment & Capability | Photosynthetic Antenna Research Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOS ALAMOS,TransitionRecord-SettingJeffersonLab

293

Laboratory Equipment Donation Program - On-Line Application  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&DynamosFrequently

294

Laboratory Equipment Donation Program - Website Policies and Important  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering&DynamosFrequentlySite

295

Nanjing First Second Power Equipment Co Ltd | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWende New Energy CoFirst Second Power Equipment Co Ltd Jump to:

296

Nanjing Sunec Wind Generator Equipment Factory | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWende New Energy CoFirst Second Power Equipment Co Ltd Jump

297

Nantong Hongbo Windpower Equipment Co Ltd HWE | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWende New Energy CoFirst Second Power Equipment Co LtdNantong

298

CRAD, Equipment and Piping Labeling Assessment Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:June 2015 <Ones |Laboratory, JuneDid y ouRev. 0) |Equipment

299

Microsoft Word - AutosamplerEquipmentArrivesatVitPlant_20101222.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMappingENVIRONMENTAL IMPACT STATEMENTbelow).A3PM-10978,B toPD2, 2010

300

Program management systems for the semiconductor processing capital equipment supply chain  

E-Print Network [OSTI]

The Capital Equipment Procurement group of Intel Corporation is responsible for developing and procuring the semiconductor processing capital equipment that is used throughout all of the company's development and manufacturing ...

Chandler, Thomas B. (Thomas Brian), 1970-

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Permit Regulations for the Construction and, or Operation of Air Emissions Equipment (Mississippi)  

Broader source: Energy.gov [DOE]

The Permit Board will issue two types of air pollution control permits, a permit to construct air emissions equipment and a State Permit to Operate such equipment. A State Permit to Operate is...

302

Equipment Availability in the Home and School Environment: Its Relationship on Physical Activity in Children  

E-Print Network [OSTI]

activity behavior of children; availability of equipment is one of these factors. The overall purpose of this dissertation was to examine availability of equipment as an environmental influence on a childs physical activity behavior. The two environments...

Montandon, Kristi

2013-01-14T23:59:59.000Z

303

MULTI-SENSOR MONITORING FOR REAL-TIME 3D VISUALIZATION OF CONSTRUCTION EQUIPMENT  

E-Print Network [OSTI]

to workers and equipment operators due to their dynamic and unstructured nature. Narrow haul roads, crowded with the inherent poor visibility that operators of equipment such as dump trucks, loaders and excavators deal

Kamat, Vineet R.

304

Analysis and sourcing of the mechanical equipment required for a ceramic pot filter production facility  

E-Print Network [OSTI]

Research was done into identifying and sourcing the mechanical equipment required for manufacturing ceramic pot filters, specifically for use in the Pure Home Water factory in Northern Ghana. The pieces of equipment ...

Getachew, Julian (Julian B.)

2011-01-01T23:59:59.000Z

305

Appliances, Lighting, Electronics, and Miscellaneous Equipment Electricity Use in New Homes  

E-Print Network [OSTI]

online: www.eia.doe.gov/cneaf/electricity/esr/esr_sum.html.Miscellaneous Equipment Electricity Use in New Homes RichardMiscellaneous Equipment Electricity Use in New Homes Richard

Brown, Richard E.; Rittelman, William; Parker, Danny; Homan, Gregory

2007-01-01T23:59:59.000Z

306

MAS 10.2 Control of Measuring and Test Equipment, 3/9/95 | Department...  

Broader source: Energy.gov (indexed) [DOE]

2 Control of Measuring and Test Equipment, 3995 MAS 10.2 Control of Measuring and Test Equipment, 3995 The objective of this surveillance is to verify that the contractor...

307

E-Print Network 3.0 - actuated mobile equipment Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

mobile equipment Search Powered by Explorit Topic List Advanced Search Sample search results for: actuated mobile equipment Page: << < 1 2 3 4 5 > >> 1 A Real-time Architecture for...

308

Vendors of Supplies and Equipment Used in ReceivingWater Monitoring  

E-Print Network [OSTI]

APPENDIX J Vendors of Supplies and Equipment Used in Receiving­Water Monitoring CONTENTS General)................................................................874 GENERAL FIELD AND LABORATORY EQUIPMENT The following vendors and manufacturers supply a large

Pitt, Robert E.

309

A Novel Approach in Determining Oil Dilution Level on a DPF Equipped...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

A Novel Approach in Determining Oil Dilution Level on a DPF Equipped Vehicle as a Result of Regeneration A Novel Approach in Determining Oil Dilution Level on a DPF Equipped...

310

Xi an Nordex Wind Turbine Co Ltd aka Xi an Weide Wind Power Equipment...  

Open Energy Info (EERE)

Wind Turbine Co Ltd aka Xi an Weide Wind Power Equipment Co Ltd Jump to: navigation, search Name: Xi'an Nordex Wind Turbine Co Ltd (aka Xi'an Weide Wind Power Equipment Co Ltd)...

311

DOE/EH-0545, Seismic Evaluation Procedure for Equipment in U...  

Office of Environmental Management (EM)

DOEEH-0545, Seismic Evaluation Procedure for Equipment in U.S. Department of Energy Facilities, 1997 DOEEH-0545, Seismic Evaluation Procedure for Equipment in U.S. Department of...

312

Operations improvement in a semiconductor capital equipment manufacturing plant : component level and assembly level inventory management  

E-Print Network [OSTI]

Semiconductor capital equipment is manufactured in a high-mix and low-volume environment at Varian Semiconductor Equipment business unit of Applied Materials. Due to the demand growth over the past years, Varian has been ...

Wu, Yiming, M. Eng. Massachusetts Institute of Technology

2012-01-01T23:59:59.000Z

313

Comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program

314

E-Print Network 3.0 - automatic equipment operation Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pennsylvania Collection: Biology and Medicine ; Chemistry 57 Safe Operating Procedure LOCKOUTTAGOUT FOR MACHINES & EQUIPMENT Summary: Safe Operating Procedure (511) LOCKOUT...

315

November 26, 2012 Procedure for the Disposal of Unwanted Laboratory Equipment  

E-Print Network [OSTI]

above, is incomplete and not posted on the equipment Freon from refrigerators and freezers has not been

Chou, James

316

Used Computer Equipment Sales Agreement By acknowledgement of this Sale Agreement, _____________________________________ (Purchaser) agrees to  

E-Print Network [OSTI]

Used Computer Equipment Sales Agreement By acknowledgement of this Sale Agreement be in the State of Wisconsin. _________________________________________ _________________ Acknowledged

Sheridan, Jennifer

317

Updated May 22, 2014 Equipment Type Type of Service Requested Est Hrs Est $  

E-Print Network [OSTI]

system 3 $165 "PM" service 1 $55 Research Equipment Support & Engineering Services Core List of Services $ Research Equipment Support & Engineering Services Core List of Services with Time and Cost EstimatesUpdated May 22, 2014 Equipment Type Type of Service Requested Est Hrs Est $ CO2 Incubator

318

Criticality safety concerns of uranium deposits in cascade equipment  

SciTech Connect (OSTI)

The Paducah and Portsmouth Gaseous Diffusion Plants enrich uranium in the {sup 235}U isotope by diffusing gaseous uranium hexafluoride (UF{sub 6}) through a porous barrier. The UF{sub 6} gaseous diffusion cascade utilized several thousand {open_quotes}stages{close_quotes} of barrier to produce highly enriched uranium (HEU). Historically, Portsmouth has enriched the Paducah Gaseous Diffusion Plant`s product (typically 1.8 wt% {sup 235}U) as well as natural enrichment feed stock up to 97 wt%. Due to the chemical reactivity of UF{sub 6}, particularly with water, the formation of solid uranium deposits occur at a gaseous diffusion plant. Much of the equipment operates below atmospheric pressure, and deposits are formed when atmospheric air enters the cascade. Deposits may also be formed from UF{sub 6} reactions with oil, UF{sub 6} reactions with the metallic surfaces of equipment, and desublimation of UF{sub 6}. The major deposits form as a result of moist air in leakage due to failure of compressor casing flanges, blow-off plates, seals, expansion joint convolutions, and instrument lines. This report describes criticality concerns and deposit disposition.

Plaster, M.J. [Lockheed Martin Utility Services, Inc., Piketon, OH (United States)

1996-12-31T23:59:59.000Z

319

Compressor Selection and Equipment Sizing for Cold Climate Heat Pumps  

SciTech Connect (OSTI)

In order to limit heating capacity degradation at -25 C (-13 F) ambient to 25%, compared to the nominal rating point capacity at 8.3 C (47 F), an extensive array of design and sizing options were investigated, based on fundamental equipment system modeling and building energy simulation. Sixteen equipment design options were evaluated in one commercial building and one residential building, respectively in seven cities. The energy simulation results were compared to three baseline cases: 100% electric resistance heating, a 9.6 HSPF single-speed heat pump unit, and 90% AFUE gas heating system. The general recommendation is that variable-speed compressors and tandem compressors, sized such that their rated heating capacity at a low speed matching the building design cooling load, are able to achieve the capacity goal at low ambient temperatures by over-speeding, for example, a home with a 3.0 ton design cooling load, a tandem heat pump could meet this cooling load running a single compressor, while running both compressors to meet heating load at low ambient temperatures in a cold climate. Energy savings and electric resistance heat reductions vary with building types, energy codes and climate zones. Oversizing a heat pump can result in larger energy saving in a less energy efficient building and colder regions due to reducing electric resistance heating. However, in a more energy-efficient building or for buildings in warmer climates, one has to consider balance between reduction of resistance heat and addition of cyclic loss.

Shen, Bo [ORNL] [ORNL; Abdelaziz, Omar [ORNL] [ORNL; Rice, C Keith [ORNL] [ORNL

2014-01-01T23:59:59.000Z

320

Seismic equipment qualification at Rocky Flats Plant: Lessons learned  

SciTech Connect (OSTI)

Seismic equipment qualification is being evaluated as a part of the Systematic Evaluation Program (SEP) at Rocky Flats Plant (RFP). Initially it was believed that the experience database developed by the Seismic Qualification Utility Group (SQUG) for commercial nuclear power plants, as outlined in their Generic Implementation Procedure (GIP), would provide a substantial benefit for the seismic adequacy verification of equipment at RFP. However, further review of the simplified guidelines contained in the GIP with respect to the specific RFP structures and components revealed substantial differences from the GIP criteria. Therefore, the number of ``outliers`` from the experience database defined in the GIP is greater than was initially anticipated. This paper presents details of the differences found between the RFP structures and components and those represented in the GIP, and the challenges presented for their evaluation at RFP. Approaches necessary to develop seismic verification data are also discussed. The discussions focus on experience with one of the nuclear facilities at RFP, Building 707. However, the conclusions are generally applicable to other similar facilities that typically comprise the RFP nuclear facilities.

Peregoy, W.; Herring, K.

1993-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Correctly specify insulation for process equipment and piping  

SciTech Connect (OSTI)

Insulation serves as a thermal barrier to resist the flow of heat. When insulation is installed over piping or equipment to minimize heat losses, the insulation is categorized as heat conservation. Software programs for determining heat losses are based on ASTM C 680. If heat conservation insulation is calculated to determine the most cost-effective thickness for piping or equipment, then the insulation is categorized as economic insulation. Methods for manually determining economic thicknesses using various graphs and precalculated charts are given in Turner and Malloy. However, modern software programs available from industrial associations calculate economic thicknesses based on after-tax annual costs. Costs associated with owning insulation are expressed on an equivalent uniform annual cost basis. The thickness with the lowest annual cost is reported as the economic thickness. Some of the economic data needed to calculate economic thicknesses are fuel cost, depreciation period, annual fuel inflation rate, annual hours of operation, return on investment, effective income tax rate, annual insulation maintenance costs, and installed costs. To obtain accurate economical thicknesses, it is best to solicit installed costs from a local contractor likely to bid on the work. This paper covers the most suitable insulation materials for certain applications, the most economic material and thickness to use, and how the total insulation system should be designed.

Allen, C. [Raytheon Engineers and Constructors, Birmingham, AL (United States)

1997-05-01T23:59:59.000Z

322

Thermal analysis of the failed equipment storage vault system  

SciTech Connect (OSTI)

A storage facility for failed glass melters is required for radioactive operation of the Defense Waste Processing Facility (DWPF). It is currently proposed that the failed melters be stored in the Failed Equipment Storage Vaults (FESV`s) in S area. The FESV`s are underground reinforced concrete structures constructed in pairs, with adjacent vaults sharing a common wall. A failed melter is to be placed in a steel Melter Storage Box (MSB), sealed, and lowered into the vault. A concrete lid is then placed over the top of the FESV. Two melters will be placed within the FESV/MSB system, separated by the common wall. There is no forced ventilation within the vault so that the melter is passively cooled. Temperature profiles in the Failed Equipment Storage Vault Structures have been generated using the FLOW3D software to model heat conduction and convection within the FESV/MSB system. Due to complexities in modeling radiation with FLOW3D, P/THERMAL software has been used to model radiation using the conduction/convection temperature results from FLOW3D. The final conjugate model includes heat transfer by conduction, convection, and radiation to predict steady-state temperatures. Also, the FLOW3D software has been validated as required by the technical task request.

Jerrell, J.; Lee, S.Y.; Shadday, A.

1995-07-01T23:59:59.000Z

323

Impacts of Water Quality on Residential Water Heating Equipment  

SciTech Connect (OSTI)

Water heating is a ubiquitous energy use in all residential housing, accounting for 17.7% of residential energy use (EIA 2012). Today, there are many efficient water heating options available for every fuel type, from electric and gas to more unconventional fuel types like propane, solar, and fuel oil. Which water heating option is the best choice for a given household will depend on a number of factors, including average daily hot water use (total gallons per day), hot water draw patterns (close together or spread out), the hot water distribution system (compact or distributed), installation constraints (such as space, electrical service, or venting accommodations) and fuel-type availability and cost. While in general more efficient water heaters are more expensive than conventional water heating technologies, the savings in energy use and, thus, utility bills can recoup the additional upfront investment and make an efficient water heater a good investment over time in most situations, although the specific payback period for a given installation will vary widely. However, the expected lifetime of a water heater in a given installation can dramatically influence the cost effectiveness and savings potential of a water heater and should be considered, along with water use characteristics, fuel availability and cost, and specific home characteristics when selecting the optimum water heating equipment for a particular installation. This report provides recommendations for selecting and maintaining water heating equipment based on local water quality characteristics.

Widder, Sarah H.; Baechler, Michael C.

2013-11-01T23:59:59.000Z

324

Plasma atomic layer etching using conventional plasma equipment  

SciTech Connect (OSTI)

The decrease in feature sizes in microelectronics fabrication will soon require plasma etching processes having atomic layer resolution. The basis of plasma atomic layer etching (PALE) is forming a layer of passivation that allows the underlying substrate material to be etched with lower activation energy than in the absence of the passivation. The subsequent removal of the passivation with carefully tailored activation energy then removes a single layer of the underlying material. If these goals are met, the process is self-limiting. A challenge of PALE is the high cost of specialized equipment and slow processing speed. In this work, results from a computational investigation of PALE will be discussed with the goal of demonstrating the potential of using conventional plasma etching equipment having acceptable processing speeds. Results will be discussed using inductively coupled and magnetically enhanced capacitively coupled plasmas in which nonsinusoidal waveforms are used to regulate ion energies to optimize the passivation and etch steps. This strategy may also enable the use of a single gas mixture, as opposed to changing gas mixtures between steps.

Agarwal, Ankur; Kushner, Mark J. [Department of Chemical and Biomolecular Engineering, University of Illinois, 600 S. Mathews Ave., Urbana, Illinois 61801 (United States); Department of Electrical Engineering and Computer Science, University of Michigan, 1301 Beal Ave., Ann Arbor, Michigan 48109-2122 (United States)

2009-01-15T23:59:59.000Z

325

ORNL's medical radioisotope project sees centennial campaign...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

actinium-225 processing, which provides radioisotopes for medical uses that include cancer treatment. Actinium-225 is a source for bismuth-213, a short-lived, alpha-emitting...

326

Math PUrview -- Mathematics Moves Mammograms to Medical ...  

E-Print Network [OSTI]

Large-scale screenings can be difficult in rural and other areas traditionally underserved by health care professionals, where there may not be medical...

327

Efficient design of precision medical robotics  

E-Print Network [OSTI]

Medical robotics is increasingly demonstrating the potential to improve patient care through more precise interventions. However, taking inspiration from industrial robotics has often resulted in large, sometimes cumbersome ...

Hanumara, Nevan Clancy

2012-01-01T23:59:59.000Z

328

Implementation Guide of Medical Standards for Firefighters  

Broader source: Energy.gov [DOE]

These guidelines were prepared to assist the DOE contractor site occupational medical programs in developing NFPA-based firefighter standards that comply with the ADA.

329

Electrical equipment performance under severe accident conditions (BWR/Mark 1 plant analysis): Summary report  

SciTech Connect (OSTI)

The purpose of the Performance Evaluation of Electrical Equipment during Severe Accident States Program is to determine the performance of electrical equipment, important to safety, under severe accident conditions. In FY85, a method was devised to identify important electrical equipment and the severe accident environments in which the equipment was likely to fail. This method was used to evaluate the equipment and severe accident environments for Browns Ferry Unit 1, a BWR/Mark I. Following this work, a test plan was written in FY86 to experimentally determine the performance of one selected component to two severe accident environments.

Bennett, P.R.; Kolaczkowski, A.M.; Medford, G.T.

1986-09-01T23:59:59.000Z

330

Clean Cities Guide to Alternative Fuel Commercial Lawn Equipment (Brochure)  

SciTech Connect (OSTI)

Guide explains the different types of alternative fuel commercial mowers and lists the makes and models of the ones available on the market. Turf grass is a fixture of the American landscape and the American economy. It is the nation's largest irrigated crop, covering more than 40 million acres. Legions of lawnmowers care for this expanse during the growing season-up to year-round in the warmest climates. The annual economic impact of the U.S. turf grass industry has been estimated at more than $62 billion. Lawn mowing also contributes to the nation's petroleum consumption and pollutant emissions. Mowers consume 1.2 billion gallons of gasoline annually, about 1% of U.S. motor gasoline consumption. Commercial mowing accounts for about 35% of this total and is the highest-intensity use. Large property owners and mowing companies cut lawns, sports fields, golf courses, parks, roadsides, and other grassy areas for 7 hours per day and consume 900 to 2,000 gallons of fuel annually depending on climate and length of the growing season. In addition to gasoline, commercial mowing consumes more than 100 million gallons of diesel annually. Alternative fuel mowers are one way to reduce the energy and environmental impacts of commercial lawn mowing. They can reduce petroleum use and emissions compared with gasoline- and diesel-fueled mowers. They may also save on fuel and maintenance costs, extend mower life, reduce fuel spillage and fuel theft, and promote a 'green' image. And on ozone alert days, alternative fuel mowers may not be subject to the operational restrictions that gasoline mowers must abide by. To help inform the commercial mowing industry about product options and potential benefits, Clean Cities produced this guide to alternative fuel commercial lawn equipment. Although the guide's focus is on original equipment manufacturer (OEM) mowers, some mowers can be converted to run on alternative fuels. For more information about propane conversions. This guide may be particularly helpful for organizations that are already using alternative fuels in their vehicles and have an alternative fuel supply or electric charging in place (e.g., golf cart charging stations at most golf courses). On the flip side, experiencing the benefits of using alternative fuels in mowing equipment may encourage organizations to try them in on-road vehicles as well. Whatever the case, alternative fuel commercial lawnmowers are a powerful and cost-effective way to reduce U.S. petroleum dependence and help protect the environment.

Not Available

2011-10-01T23:59:59.000Z

331

Directional Drilling and Equipment for Hot Granite Wells  

SciTech Connect (OSTI)

Directional drilling technology was extended and modified to drill the first well of a subsurface geothermal energy extraction system at the Fenton Hill, New Mexico, hot dry rock (HDR) experimental site. Borehole geometries, extremely hard and abrasive granite rock, and high formation temperatures combined to provide a challenging environment for directional drilling tools and instrumentation. Completing the first of the two-wellbore HDR system resulted in the definition of operation limitations of -many conventional directional drilling tools, instrumentation, and techniques. The successful completion of the first wellbore, Energy Extraction Well No. 2 (EE-21), to a measured depth of 4.7 km (15,300 ft) in granite reservoir rock with a bottomhole temperature of 320 C (610 F) required the development of a new high-temperature downhole motor and modification of existing wireline-conveyed steering tool systems. Conventional rotary-driven directional assemblies were successfully modified to accommodate the very hard and abrasive rock encountered while drilling nearly 2.6 km (8,500 ft) of directional hole to a final inclination of 35{sup o} from the vertical at the controlled azimuthal orientation. Data were collected to optimize the drilling procedures far the programmed directional drilling of well EE-3 parallel to, and 370 metres (1,200 ft) above, Drilling equipment and techniques used in drilling wellbores for extraction of geothermal energy from hot granite were generally similar to those that are standard and common to hydrocarbon drilling practices. However, it was necessary to design some new equipment for this program: some equipment was modified especially for this program and some was operated beyond normal ratings. These tools and procedures met with various degrees of success. Two types of shock subs were developed and tested during this project. However, downhole time was limited, and formations were so varied that analysis of the capabilities of these items is not conclusive. Temperature limits of the tools were exceeded. EE-2. Commercial drilling and fishing jars were improved during the drilling program. Three-cone, tungsten-carbide insert bit performance with downhole motors was limited by rapid gauge wear. Rotary drilling was optimized for wells EE-2 and EE-3 using softer (IADS 635 code) bits and provided a balance between gauge,. cutting structure, and bearing life. Problems of extreme drill string drag, drill string twist-off, and corrosion control are discussed.

Williams, R. E.; Neudecker, J. W.; Rowley, J.C.; Brittenham, T. L.

1981-01-01T23:59:59.000Z

332

High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test  

SciTech Connect (OSTI)

About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

Richard D. Boardman; B. H. O'Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

2004-02-01T23:59:59.000Z

333

G429 Clothing/Equipment/Supply List Field clothes, field boots, and field equipment, including geologic hammer and hand lens, will be needed on  

E-Print Network [OSTI]

G429 Clothing/Equipment/Supply List Clothing Field clothes, field boots, and field equipment field day, a windbreaker over a sweater or sweatshirt is a more versatile field dress than a heavy Water shoes (tevas or old tennis shoes) for use in G429e and/or recreation o Flip flops (optional

Polly, David

334

G433 Clothing/Equipment/Supply List Field clothes, field boots, and field equipment, including geologic hammer and hand lens, will be needed on  

E-Print Network [OSTI]

G433 Clothing/Equipment/Supply List Clothing Field clothes, field boots, and field equipment field day, a windbreaker over a sweater or sweatshirt is a more versatile field dress than a heavy Water shoes (tevas or old tennis shoes) o Flip flops (optional) for shower area o Scree Gaitors

Polly, David

335

G429 Clothing/Equipment/Supply List Field clothes, field boots, and field equipment, including geologic hammer and hand lens, will be needed on  

E-Print Network [OSTI]

G429 Clothing/Equipment/Supply List Clothing Field clothes, field boots, and field equipment field day, a windbreaker over a sweater or sweatshirt is a more versatile field dress than a heavy Water shoes (tevas or old tennis shoes) o Flip flops (optional) for shower area o Scree Gaitors

Polly, David

336

G433 Clothing/Equipment/Supply List Field clothes, field boots, and field equipment, including geologic hammer and hand lens, will be needed on the  

E-Print Network [OSTI]

G433 Clothing/Equipment/Supply List Clothing Field clothes, field boots, and field equipment field day, a windbreaker over a sweater or sweatshirt is a more versatile field dress than a heavy Water shoes (tevas or old tennis shoes) o Flip flops (optional) for shower area o Scree Gaitors

Polly, David

337

hESC Equipment Certification Process The following process is to be followed before capital equipment can be used for human  

E-Print Network [OSTI]

Management. 3. Materials Management will research the FRS account(s) used to purchase the equipment and distribute copies of the completed form to the PI, Materials Management, and Isolde Bates. If further review the disposition of the equipment and forward copies of the completed form to the PI, Materials Management

Kim, Duck O.

338

Models, Calculation and Optimization of Gas Networks, Equipment and Contracts for Design, Operation, Booking and Accounting  

E-Print Network [OSTI]

There are proposed models of contracts, technological equipment and gas networks and methods of their optimization. The flow in network undergoes restrictions of contracts and equipment to be operated. The values of sources and sinks are provided by contracts. The contract models represent (sub-) networks. The simplest contracts represent either nodes or edges. Equipment is modeled by edges. More sophisticated equipment is represented by sub-networks. Examples of such equipment are multi-poles and compressor stations with many entries and exits. The edges can be of different types corresponding to equipment and contracts. On such edges, there are given systems of equation and inequalities simulating the contracts and equipment. On this base, the methods proposed that allow: calculation and control of contract values for booking on future days and for accounting of sales and purchases; simulation and optimization of design and of operation of gas networks. These models and methods are realized in software syst...

Ostromuhov, Leonid A

2011-01-01T23:59:59.000Z

339

Novel Carbon Films for Next Generation Rotating Equipment Applications  

SciTech Connect (OSTI)

This report describes the results of research performed on a new generation of low friction, wear resistant carbon coatings for seals and bearings in high speed rotating equipment. The low friction coatings, Near Frictionless Carbon (NFC), a high hydrogen content diamondlike carbon, and Carbide Derived Carbon (CDC), a conversion coating produced on the surfaces of metal carbides by halogenation, can be applied together or separately to improve the performance of seals and bearings, with benefits to energy efficiency and environmental protection. Because hard carbide ceramics, such as silicon carbide, are widely used in the seals industry, this coating is particularly attractive as a low cost method to improve performance. The technology of CDC has been licensed to an Illinois company, Carbide Derivative Technologies, Inc. (CDTI) to implement the commercialization of this material.

Michael McNallan; Ali Erdemir; Yury Gogotsi

2006-02-20T23:59:59.000Z

340

Identification of features in indexed data and equipment therefore  

DOE Patents [OSTI]

Embodiments of the present invention provide methods of identifying a feature in an indexed dataset. Such embodiments encompass selecting an initial subset of indices, the initial subset of indices being encompassed by an initial window-of-interest and comprising at least one beginning index and at least one ending index; computing an intensity weighted measure of dispersion for the subset of indices using a subset of responses corresponding to the subset of indices; and comparing the intensity weighted measure of dispersion to a dispersion critical value determined from an expected value of the intensity weighted measure of dispersion under a null hypothesis of no transient feature present. Embodiments of the present invention also encompass equipment configured to perform the methods of the present invention.

Jarman, Kristin H [Richland, WA; Daly, Don Simone [Richland, WA; Anderson, Kevin K [Richland, WA; Wahl, Karen L [Richland, WA

2002-04-02T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Instrumentation and Equipment for Three Independent Research Labs  

SciTech Connect (OSTI)

Completed in 2011, Albright's new Science Center includes three independent student and faculty research labs in Biology, Chemistry/Biochemistry, and Physics (separate from teaching labs). Providing independent research facilities, they eliminate disruptions in classrooms and teaching labs, encourage and accommodate increased student interest, and stimulate advanced research. The DOE grant of $369,943 enabled Albright to equip these advanced labs for 21st century science research, with much instrumentation shared among departments. The specialty labs will enable Albright to expand its student-faculty research program to meet growing interest, help attract superior science students, maximize faculty expertise, and continue exceeding its already high rates of acceptance for students applying for postgraduate education or pharmaceutical research positions. Biology instrumentation/equipment supports coursework and independent and collaborative research by students and faculty. The digital shaker, CO{sub 2} and water bath incubators (for controlled cell growth), balance, and micropipettes support cellular biology research in the advanced cell biology course and student-faculty research into heavy metal induction of heat shock proteins in cultured mammalian cells and the development of PCR markers from different populations of the native tree, Franklinia. The gravity convection oven and lyophilizer support research into physical and chemical analysis of floodplain sediments used in assessment of riparian restoration efforts. The Bio-Rad thermocycler permits fast and accurate DNA amplification as part of research into genetic diversity in small mammal populations and how those populations are affected by land-use practices and environmental management. The Millipore water deionizing system and glassware washer provide general support of the independent research lab and ensure quality control of coursework and interdisciplinary research at the intersection of biology, chemistry, and toxicology. Grant purchases support faculty and students working in the areas of plant cellular biology, landscape ecology and wildlife management, wetland restoration, and ecotoxicology of aquatic invertebrates. Chemistry/BioChemistry instrumentation supports a wide range of research and teaching needs. The Dell quad core Xeon processors and Gaussian 09 support computational research efforts of two of our faculty. The computational work of one of these groups is part of close collaboration with one organic chemist and provides support info for the synthetic work of this professor and his students. Computational chemistry studies were also introduced into the physical chemistry laboratory course for junior chemistry concentrators. The AKTA plus system and superdex columns, Thermoscientific Sorvall RC-6 plus superspeed centrifuge, Nanodrop spectrometer, Eppendorf microfuge, Homogenizer and Pipetman pipetters were incorporated into a research project involving purification and characterization of a construct of beta 2-microglobulin by one of our biochemists. The vacuum system (glove box, stand, and pump) makes a significant contribution to the research of our inorganic chemist, the newest department member, working on research projects with four students. The glove box provides the means to carry out their synthetic work in an oxygenless atmosphere. Supporting basic research pursued by faculty and students, the remaining items (refrigerator/freezer units for flammable storage, freezer, refrigerated water bath, rotary evaporator system, vacuum oven, analytical and top-loading balances) were distributed between our biochemistry and chemistry research labs. The Nanodrop spectrometer, Sorvall centrifuge, and rotary evaporator system are used in several junior/senior lab courses in both biochemistry and chemistry. To date, 14 undergraduate research students have been involved in projects using the new instrumentation and equipment provided by this grant. Physics equipment acquired is radically transforming Albright research and teaching capabilities. The tw

Darlene Roth

2012-03-29T23:59:59.000Z

342

New developments for high power electron beam equipment  

SciTech Connect (OSTI)

High power electron guns for industrial use work in the range of power of more than 10 kW up to 1200 kW. The only suitable principle for this purpose is that used in axial guns. Elements necessary for these EB guns and their design are described. The outstanding properties required for applications in production and R & D can only be achieved if the equipment is supplemented by a high voltage supply, beam guidance supply, vacuum generator and the various devices for observation, measurement and control. Standard rules for both the technical demands in application and dimensioning of some of the necessary components are explained. Special developments, such as high speed deflection, observation by BSE-camera and arc-free electron beam systems are also presented.

Melde, C.; Jaesch, G.; Maedler, E. [Von Ardenne Anlagentechnnik GmbH, Dresden (Germany)

1994-12-31T23:59:59.000Z

343

Long-length contaminated equipment disposal process path document  

SciTech Connect (OSTI)

The first objective of the LLCE Process Path Document is to guide future users of this system on how to accomplish the cradle-to-grave process for the disposal of long-length equipment. Information will be provided describing the function and approach to each step in the process. Pertinent documentation, prerequisites, drawings, procedures, hardware, software, and key interfacing organizations will be identified. The second objective is related to the decision to lay up the program until funding is made available to complete it or until a need arises due to failure of an important component in a waste tank. To this end, the document will identify work remaining to be completed for each step of the process and open items or issues that remain to be resolved.

McCormick, W.A.

1998-09-30T23:59:59.000Z

344

DEVELOPMENT OF PERSONAL PROTECTIVE EQUIPMENT FOR DECONTAMINATION AND DECOMMISSIONING  

SciTech Connect (OSTI)

The purpose of this one-year investigation is to perform a technology integration/search, thereby ensuring that the safest and most cost-effective options are developed and subsequently used during the deactivation and decommissioning (D&D) of U.S. Department of Energy Environmental Management (DOE-EM) sites. Issues of worker health and safety are the main concern, followed by cost. Two lines of action were explored: innovative Personal Cooling Systems (PCS) and Personal Monitoring Equipment (PME). PME refers to sensors affixed to the worker that warn of an approaching heat stress condition, thereby preventing it. Three types of cooling systems were investigated: Pre-Chilled or Forced-Air System (PCFA), Umbilical Fluid-Chilled System (UFCS), and Passive Vest System (PVS). Of these, the UFCS leads the way. The PVS or Gel pack vest lagged due to a limited cooling duration. And the PCFA or chilled liquid air supply was cumbersome and required an expensive and complex recharge system. The UFCS in the form of the Personal Ice Cooling System (PICS) performed exceptionally. The technology uses a chilled liquid circulating undergarment and a Personal Protective Equipment (PPE) external pump and ice reservoir. The system is moderately expensive, but the recharge is low-tech and inexpensive enough to offset the cost. There are commercially available PME that can be augmented to meet the DOE's heat stress alleviation need. The technology is costly, in excess of $4,000 per unit. Workers easily ignore the alarm. The benefit to health & safety is indirect so can be overlooked. A PCS is a more justifiable expenditure.

M.A. Ebadian, Ph.D.

1999-01-01T23:59:59.000Z

345

Boston University AccelerAted MedicAl And dentAl ProgrAMs  

E-Print Network [OSTI]

Boston University AccelerAted MedicAl And dentAl ProgrAMs teAcher evAlUAtion To the applicant: Applicants to any of the College of Arts & Sciences' accelerated medical or dental programs must submit three (last, first, middle initial) Date of birth Accelerated Program of application (please check one

Finzi, Adrien

346

MASTER'S OF ADVANCED STUDIES IN MEDICAL PHYSICS  

E-Print Network [OSTI]

and Physiology as applied to Medical Physics · Radiobiology · Radiation Physics · Radiation Dosimetry · Physics of Nuclear Medicine · Medical Physics Imaging Fundamentals · Physics of Diagnostic and Interventional radiology, nuclear medicine and radiation protection in a hospital of the clinical network (hospitals

347

The Academy at Harvard Medical School  

E-Print Network [OSTI]

The Academy at Harvard Medical School The Academy Center for Teaching and Learning Annual Report 2009-2010 #12;Richard Schwartzstein, MD Director, Academy at Harvard Medical School Ellen and Melvin for the HMS Academy. With the assistance of an advisory council drawn from each of the major HMS affiliates

Paulsson, Johan

348

Medical Surveillance n Based on risk assessment  

E-Print Network [OSTI]

Surveillance Risk Assessment 2.12 #12;n Top management n overall safety policy n resource allocation n2.12 #12;Medical Surveillance Criteria n Based on risk assessment n Pre-placement n evaluate of numbers exists n Predict an outcome given similar events Medical Surveillance Risk Assessment 2.12 #12;n

Collins, Gary S.

349

HEALTH AND MEDICAL RESEARCH STRATEGIC REVIEW  

E-Print Network [OSTI]

FOR RESEARCH TRANSLATION 55 3.1.1 Research partnerships with health care providers 55 3.1.2 ResearchHEALTH AND MEDICAL RESEARCH STRATEGIC REVIEW FINAL REPORT 14 JUNE 2013 #12;#12;CHAIRMAN'S FOREWORD does Sydney's performance in health and medical research compare? 19 1.3.2 Internal fragmentation 23 1

Viglas, Anastasios

350

Medical Examination Office of Human Resources  

E-Print Network [OSTI]

Medical Examination 4.40 Office of Human Resources Applies to: Faculty, staff, graduate associates, student employees, and applicants The Ohio State University Office of Human Resources Page 1 of 1 Policy 4.40 medical Examination Resources Edited 12/10/13 Resources for Policy 4.40 Drug-Free Workplace, Policy 7

Howat, Ian M.

351

Safety equipment list for the light duty utility arm system  

SciTech Connect (OSTI)

The initial issue (Revision 0) of this Safety Equipment List (SEL) for the Light Duty Utility Arm (LDUA) requires an explanation for both its existence and its being what it is. All LDUA documentation leading up to creation of this SEL, and the SEL itself, is predicated on the LDUA only being approved for use in waste tanks designated as Facility Group 3, i.e., it is not approved for use in Facility Group 1 or 2 waste tanks. Facility Group 3 tanks are those in which a spontaneous or induced hydrogen gas release would be small, localized, and would not exceed 25% of the LFL when mixed with the remaining air volume in the dome space; exceeding these parameters is considered unlikely. Thus, from a NFPA flammable gas environment perspective the waste tank interior is not classified as a hazardous location. Furthermore, a hazards identification and evaluation (HNF-SD-WM-HIE-010, REV 0) performed for the LDUA system concluded that the consequences of actual LDUA system postulated accidents in Flammable Gas Facility Group 3 waste tanks would have either NO IMPACT or LOW IMPACT on the offsite public and onsite worker. Therefore, from a flammable gas perspective, there is not a rationale for classifying any of SSCs associated with the LDUA as either Safety Class (SC) or Safety Significant (SS) SSCs, which, by default, categorizes them as General Service (GS) SSCs. It follows then, based on current PHMC procedures (HNF-PRO-704 and HNF-IP-0842, Vol IV, Section 5.2) for SEL creation and content, and from a flammable gas perspective, that an SEL is NOT REQ@D HOWEVER!!! There is both a precedent and a prudency to capture all SSCS, which although GS, contribute to a Defense-In-Depth (DID) approach to the design and use of equipment in potentially flammable gas environments. This Revision 0 of the LDUA SEL has been created to capture these SSCs and they are designated as GS-DID in this document. The specific reasons for doing this are listed.

Barnes, G.A.

1998-03-02T23:59:59.000Z

352

Equipment for Anti- Electricity Stealing with Remote Monitoring  

E-Print Network [OSTI]

AbstractThe power theft monitoring is an important research in electric power system, and electricity-stealing prevention became a big problem to the electricity board. based on the kind of electricity-stealing and actual demand of prevention of stealing electricity, the equipment of electricity-stealing with remote monitoring is designed, with PIC microcontroller as the control core. In this the standard energy meter and user energy meter are used to calculate and judge whether electricity-stealing happen or not. Results of the user application show that the system not only realizes monitoring the behavior of electricity stealing, accurately recording the time of electricity-stealing occur and finish, the quantity of electricity-stealing and sends the information to the area field man through SMS to detect the electricity-stealer, but also realizes the behavior of electricity-stealing with remote monitoring, which is convenient for centralized management.In addition, the system offers a solving method to the data of meter reading.

Mr. Sudheer K. Reddy; Mr. Musthafa. P; Mr. K. Sakthidhasan

353

E-Print Network 3.0 - army rapid equipping Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Army Pamphlet 2201 Summary: , equipping, training Army units for progressive readiness to conduct full spectrum operations across... Department of the Army Pamphlet 220-1 Field...

354

Surveillance Guide - MAS 10.2 Control of Measuring and Test Equipment  

Broader source: Energy.gov (indexed) [DOE]

CONTROL OF MEASURING AND TEST EQUIPMENT 1.0 Objective The objective of this surveillance is to verify that the contractor maintains adequate control of tools, gauges, instruments,...

355

NNSA Y-12 National Security Complex Transfers $8M of Equipment...  

National Nuclear Security Administration (NNSA)

Y-12 National Security Complex Transfers 8M of Equipment to DoD for Reapplication | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

356

Advanced Manufacturing and Engineering Equipment at the University of Southern Indiana  

SciTech Connect (OSTI)

Department of Energy grant DE-SC0005231was awarded to the University of Southern Indiana for the purchase of Advanced Manufacturing and Engineering equipment.

Mitchell, Zane Windsor [University of Southern Indiana; Gordon, Scott Allen [University of Southern Indiana

2014-08-04T23:59:59.000Z

357

Trinity College Dublin Guidance on furniture and equipment on fire escape routes  

E-Print Network [OSTI]

include: Photocopiers, Printers, Computers, Televisions Drinks and Snack Machines Freezers and Refrigerators Examples of equipment that is not included in this list include: Telephones, Battery (dry cell

O'Mahony, Donal E.

358

Energy-efficiency labels and standards: A guidebook for appliances, equipment and lighting  

E-Print Network [OSTI]

commercial-package air-conditioning and heating equipment, packaged terminal air condi- tioners and heat pumps, warm-air furnaces, packaged boilers, storage water heaters,

McMahon, James E.; Wiel, Stephen

2001-01-01T23:59:59.000Z

359

UGA Computer Equipment, Software or Services (CESS) Request Form Individual Responsible for CESS Resource and Location  

E-Print Network [OSTI]

UGA Computer Equipment, Software or Services (CESS) Request Form Individual Responsible for CESS to install and utilize these resources in a manner consistent with established University Computer Security

Arnold, Jonathan

360

Experimental analysis of variable capacity heat pump system equipped with vapour injection and permanent magnet motor.  

E-Print Network [OSTI]

?? This study analyzes the performance of variable capacity heat pump scroll compressor which is equipped with vapour injection and permanent magnet motor. Refrigerant used (more)

Awan, Umer Khalid

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Max Tech and Beyond: Maximizing Appliance and Equipment Efficiency by Design  

E-Print Network [OSTI]

could save roughly 50% of the energy consumed per port (ports consume much of network equipment energy), or 12% ofthrough the port. The recent development of energy efficient

Desroches, Louis-Benoit

2012-01-01T23:59:59.000Z

362

OSS 19.1 Personal Protective Equipment 5/23/95  

Broader source: Energy.gov [DOE]

The objective of this surveillance is to evaluate the use of personal protection equipment to mitigate hazards that workers encounter in performing their jobs. The surveillance activities provide...

363

DEPARTMENT OWNED EQUIPMENT INFORMATION Use this form to provide the required information for your department owned equipment to University of Michigan  

E-Print Network [OSTI]

information for your department owned equipment to University of Michigan (U-M) Parking and Transportation Plate Parking and Transportation Services (PTS) 1213 Kipke Drive Ann Arbor, Michigan 48109

Kirschner, Denise

364

IsoRay Medical William A. Cavanagh  

E-Print Network [OSTI]

2011 #12;IsoRay Medical AMEX: ISR Founded: 1998 Richland, Washington Employees: 35 Market Cap (3 complex. The production facility is completely independent with it's own HVAC and Emergency Power Systems

365

Postgraduate Medical Education Clinician Investigator Program (CIP)  

E-Print Network [OSTI]

1 Postgraduate Medical Education Clinician Investigator Program (CIP. DESCRIPTION OF CIP PROGRAM ..................................................................8 3.1 OVERVIEW .......................................................................................................................8 3.2 CIP TRAINING PATHWAYS (DISTRIBUTION OF RESEARCH TRAINING)...................................8

Hitchcock, Adam P.

366

21A.215 Medical Anthropology, Fall 2004  

E-Print Network [OSTI]

Examination of how medicine is practiced cross-culturally, with particular emphasis on Western biomedicine. Analysis of medical practice as a cultural system, focusing on the human, as opposed to the biological, side of ...

Jackson, Jean E. (Jean Elizabeth), 1943-

367

21A.215 Medical Anthropology, Fall 2002  

E-Print Network [OSTI]

Examination of how medicine is practiced cross-culturally, with particular emphasis on Western biomedicine. Analysis of medical practice as a cultural system, focusing on the human, as opposed to the biological, side of ...

Jackson, Jean E. (Jean Elizabeth), 1943-

368

Dynamic security for medical record sharing  

E-Print Network [OSTI]

Information routinely collected by health care organizations is used by researchers to analyze the causes of illness and evaluate the effectiveness of potential cures. Medical information sharing systems are built to ...

Cody, Patrick M. (Patrick Michael), 1980-

2003-01-01T23:59:59.000Z

369

Medical physics calculations with MCNP: a primer  

E-Print Network [OSTI]

of Medical Internal Radiation Dose (MIRD) specific absorbed fraction (SAF) values using the ORNL MIRD phantom, x-ray phototherapy effectiveness, prostate brachytherapy lifetime dose calculations, and a radiograph of the head using the Zubal head phantom. Also...

Lazarine, Alexis D

2006-10-30T23:59:59.000Z

370

Medical Student Research in Nephrology and Hypertension  

E-Print Network [OSTI]

Medical Student Research in Nephrology and Hypertension Summer 2013 Research Opportunity Nancy Lightsey, MSRTP-NH Program Administrator Division of Nephrology and Hypertension Vanderbilt University or translational research in kidney disease or hypertension (no research experience required) · Career advice

Finley Jr., Russell L.

371

DOE: Former Worker Medical Screening Program (FWP)  

Broader source: Energy.gov [DOE]

FWP provides no-cost medical screenings to all former DOE Federal, contractor and subcontractor employees. The screening exams are offered by third party providers from universities, labor unions,...

372

Computer- and robot-assisted Medical Intervention  

E-Print Network [OSTI]

Medical robotics includes assistive devices used by the physician in order to make his/her diagnostic or therapeutic practices easier and more efficient. This chapter focuses on such systems. It introduces the general field of Computer-Assisted Medical Interventions, its aims, its different components and describes the place of robots in that context. The evolutions in terms of general design and control paradigms in the development of medical robots are presented and issues specific to that application domain are discussed. A view of existing systems, on-going developments and future trends is given. A case-study is detailed. Other types of robotic help in the medical environment (such as for assisting a handicapped person, for rehabilitation of a patient or for replacement of some damaged/suppressed limbs or organs) are out of the scope of this chapter.

Troccaz, Jocelyne

2009-01-01T23:59:59.000Z

373

Segmentation of medical images under topological constraints  

E-Print Network [OSTI]

Major advances in the field of medical imaging over the past two decades have provided physicians with powerful, non-invasive techniques to probe the structure, function, and pathology of the human body. This increasingly ...

Sgonne, Florent, 1976-

2006-01-01T23:59:59.000Z

374

E-Print Network 3.0 - asan medical center Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MEDICAL CENTER AT MISSION BAY PARKING STRUCTURE 12;SITE PLAN UCSF... MEDICAL CENTER AT MISSION BAY PARKING STRUCTURE 12;APPROACH FROM MEDICAL CENTER UCSF MEDICAL CENTER... AT...

375

Healthcare Energy: State University of New York Upstate Medical...  

Broader source: Energy.gov (indexed) [DOE]

State University of New York Upstate Medical University East Wing Healthcare Energy: State University of New York Upstate Medical University East Wing The Building Technologies...

376

Merle West Medical Center Space Heating Low Temperature Geothermal...  

Open Energy Info (EERE)

Merle West Medical Center Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Merle West Medical Center Space Heating Low Temperature Geothermal...

377

Complex Medical Processes as Context for Embedded George S. Avrunin  

E-Print Network [OSTI]

" in- fusion pumps for intravenous administration of medications and fluids. Infusion pumps were several channels infusing different medications. Errors in setting the pumps can lead to administration

Avrunin, George S.

378

asymptomatic medical students: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and previous Finley Jr., Russell L. 7 Medical Plan Detail Document for Funded Graduate Students Engineering Websites Summary: Status Change MedicalPrescription Drug Card...

379

Integrated Commissioning for a Large Medical Facility  

E-Print Network [OSTI]

Integrated Commissioning for A Large Medical Facility Yeqiao Zhu, Ph.D. Project Manager Texas A&M University Mingsheng Liu, Ph.D. Tommy Batten John Zhou, Ph.D. Associate Professor Researcher Control Engineer University of Nabraska Texas A... Commissioning (CC) can still reduce the energy consumption further and also can improve the building comfort level [Zhu, et al., 1997; Liu, et al., 1998; Claridge, et al., 1996; Haasl and Edmunds, 1997; Lawson, 19971. For the large medical center, the HVAC...

Zhu, Y.; Batten, T.; Turner, W. D.; Claridge, D. E.; Giebler, T.; Liu, M.; Zhou, J.; Cameron, C.; Keeble, B.; Hirchak, R.

2000-01-01T23:59:59.000Z

380

Chief Medical Officer | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChief Medical Officer Chief Medical Officer Dr. Ardaiz

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Decontamination of process equipment using recyclable chelating solvent  

SciTech Connect (OSTI)

The Department of Energy (DOE) is now faced with the task of meeting decontamination and decommissioning obligations at numerous facilities by the year 2019. Due to the tremendous volume of material involved, innovative decontamination technologies are being sought that can reduce the volumes of contaminated waste materials and secondary wastes requiring disposal. With sufficient decontamination, some of the material from DOE facilities could be released as scrap into the commercial sector for recycle, thereby reducing the volume of radioactive waste requiring disposal. Although recycling may initially prove to be more costly than current disposal practices, rapidly increasing disposal costs are expected to make recycling more and more cost effective. Additionally, recycling is now perceived as the ethical choice in a world where the consequences of replacing resources and throwing away reusable materials are impacting the well-being of the environment. Current approaches to the decontamination of metals most often involve one of four basic process types: (1) chemical, (2) manual and mechanical, (3) electrochemical, and (4) ultrasonic. {open_quotes}Hard{close_quotes} chemical decontamination solutions, capable of achieving decontamination factors (Df`s) of 50 to 100, generally involve reagent concentrations in excess of 5%, tend to physically degrade the surface treated, and generate relatively large volumes of secondary waste. {open_quotes}Soft{close_quotes} chemical decontamination solutions, capable of achieving Df`s of 5 to 10, normally consist of reagents at concentrations of 0.1 to 1%, generally leave treated surfaces in a usable condition, and generate relatively low secondary waste volumes. Under contract to the Department of Energy, the Babcock & Wilcox Company is developing a chemical decontamination process using chelating agents to remove uranium compounds and other actinide species from process equipment.

Jevec, J.; Lenore, C.; Ulbricht, S.

1995-12-01T23:59:59.000Z

382

Safety First Safety Last Safety Always Inspect rigging equipment for material handling before use  

E-Print Network [OSTI]

Safety First Safety Last Safety Always Inspect rigging equipment for material handling before use. Rigging Equipment for Material Handling Safety Tip #19 At your job or at the plate, you can't get home on the reverse side of this safety tip sheet. Please refrain from reading the information verbatim

Minnesota, University of

383

Large mobile mining equipment operating on soft ground T.G. Joseph  

E-Print Network [OSTI]

1 Large mobile mining equipment operating on soft ground T.G. Joseph School of Mining & Petroleum. The toll on large mobile mining equipment such as > 327 tonne capacity haulers and > 46 m3 electric for large mobile units, a discussion on the extension of the process to shovel undercarriage and carbody

Joseph, Tim Grain

384

Review of Pre- and Post-1980 Buildings in CBECS - HVAC Equipment  

SciTech Connect (OSTI)

PNNL was tasked by DOE to look at HVAC systems and equipment for Benchmark buildings based on 2003 CBECS data. This white paper summarizes the results of PNNLs analysis of 2003 CBECS data and provides PNNLs recommendations for HVAC systems and equipment for use in the Benchmark buildings.

Winiarski, David W.; Jiang, Wei; Halverson, Mark A.

2006-12-01T23:59:59.000Z

385

PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INVENTORY Procedures for Completing Annual Capital Equipment Inventory  

E-Print Network [OSTI]

PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INVENTORY Procedures for Completing Annual Capital Equipment Inventory 1. Check off each item on the inventory report, as it is located. Place one of the small white inventory FY 2011 stickers on the equipment, as it is located. This will eliminate counting

Provancher, William

386

michael smith ornlradioactive beams: equipment & techniques p-induced reaction measurements  

E-Print Network [OSTI]

michael smith ornlradioactive beams: equipment & techniques p-induced reaction measurements Silicon dealing with low purity #12;michael smith ornlradioactive beams: equipment & techniques p-induced reaction of impure beams possible! · Nearly background- free yields! #12;michael smith ornlradioactive beams

387

Acquisition of Single Crystal Growth and Characterization Equipment  

SciTech Connect (OSTI)

Final Report for DOE Grant No. DE-FG02-04ER46178 'Acquisition of Single Crystal Growth and Characterization Equipment'. There is growing concern in the condensed matter community that the need for quality crystal growth and materials preparation laboratories is not being met in the United States. It has been suggested that there are too many researchers performing measurements on too few materials. As a result, many user facilities are not being used optimally. The number of proficient crystal growers is too small. In addition, insufficient attention is being paid to the enterprise of finding new and interesting materials, which is the driving force behind much of condensed matter research and, ultimately, technology. While a detailed assessment of this situation is clearly needed, enough evidence of a problem already exists to compel a general consensus that the situation must be addressed promptly. This final report describes the work carried out during the last four years in our group, in which a state-of-the-art single crystal growth and characterization facility was established for the study of novel oxides and intermetallic compounds of rare earth, actinide and transition metal elements. Research emphasis is on the physics of superconducting (SC), magnetic, heavy fermion (HF), non-Fermi liquid (NFL) and other types of strongly correlated electron phenomena in bulk single crystals. Properties of these materials are being studied as a function of concentration of chemical constituents, temperature, pressure, and magnetic field, which provide information about the electronic, lattice, and magnetic excitations at the root of various strongly correlated electron phenomena. Most importantly, the facility makes possible the investigation of material properties that can only be achieved in high quality bulk single crystals, including magnetic and transport phenomena, studies of the effects of disorder, properties in the clean limit, and spectroscopic and scattering studies through efforts with numerous collaborators. These endeavors will assist the effort to explain various outstanding theoretical problems, such as order parameter symmetries and electron-pairing mechanisms in unconventional superconductors, the relationship between superconductivity and magnetic order in certain correlated electron systems, the role of disorder in non-Fermi liquid behavior and unconventional superconductivity, and the nature of interactions between localized and itinerant electrons in these materials. Understanding the mechanisms behind strongly correlated electron behavior has important technological implications.

Maple, M. Brian; Zocco, Diego A.

2008-12-09T23:59:59.000Z

388

Medical Computing Science at the University of Aberdeen  

E-Print Network [OSTI]

Medical Computing Science at the University of Aberdeen Department of Computing Science, and The Faculty of Medicine and Medical Sciences University of Aberdeen 26/10/00 Summary Computers are currently is to offer a course in medical computing science at the undergraduate level. The course, called Medical

Lucas, Peter

389

Minnesota Medical Foundation McNamara Alumni Center  

E-Print Network [OSTI]

in interventional radiology and pediatric cardiology. In short, one of Minnesota's medical miracle-makers. Amplatz

Minnesota, University of

390

Management of hazardous medical waste in Croatia  

SciTech Connect (OSTI)

This article provides a review of hazardous medical waste production and its management in Croatia. Even though Croatian regulations define all steps in the waste management chain, implementation of those steps is one of the country's greatest issues. Improper practice is evident from the point of waste production to final disposal. The biggest producers of hazardous medical waste are hospitals that do not implement existing legislation, due to the lack of education and funds. Information on quantities, type and flow of medical waste are inadequate, as is sanitary control. We propose an integrated approach to medical waste management based on a hierarchical structure from the point of generation to its disposal. Priority is given to the reduction of the amounts and potential for harm. Where this is not possible, management includes reduction by sorting and separating, pretreatment on site, safe transportation, final treatment and sanitary disposal. Preferred methods should be the least harmful for human health and the environment. Integrated medical waste management could greatly reduce quantities and consequently financial strains. Landfilling is the predominant route of disposal in Croatia, although the authors believe that incineration is the most appropriate method. In a country such as Croatia, a number of small incinerators would be the most economical solution.

Marinkovic, Natalija [Medical School University of Zagreb, Department for Chemistry and Biochemistry, Salata 3b, 10 000 Zagreb (Croatia)], E-mail: nmarinko@snz.hr; Vitale, Ksenija; Holcer, Natasa Janev; Dzakula, Aleksandar ['Andrija Stampar' School of Public Health, Medical School University of Zagreb, Rockefellerova 4, 10 000 Zagreb (Croatia); Pavic, Tomo [Ministry of Health and Social Welfare, Ksaver 200, 10 000 Zagreb (Croatia)

2008-07-01T23:59:59.000Z

391

Medical information and the right to privacy  

SciTech Connect (OSTI)

This report is a compilation of submitted abstracts of papers presented at the DOE-supported workshop on medical information and the right to privacy held at the National Academy of Sciences in Washington, DC, on June 9 and 10, 1994. The aim of this meeting is to provide a forum to discuss the legal, ethical and practical issues related to the computerization and use of medical data, as well as the potential impact the use of these data may have on an individual`s privacy. Topical areas include an overview of the Federal and legal requirements to collect medical data, historical experiences with worker screening programs, currently available medical surveillance technologies (both biomedical and computer technologies) and their limitations. In addition, an-depth assessment of the needs and interests of a wide spectrum of parties as they relate to the use of medical data from both a legal and privacy perspective is provided. The needs of the individual, the public (e.g., blood and tissue banks), private enterprises (e.g., industry and insurance carriers), and the government (e.g., FBI) are discussed. Finally, the practical and legal issues relating to the use of computers to carry, store and transmit this information are also examined. The abstracts are presented in the intended order of presentation as indicated in the agenda for the meeting.

Drell, D. [ed.

1994-06-01T23:59:59.000Z

392

says Michel Torbey, MD, medical director of OSU Medical Center's Neurovascular Stroke Center.  

E-Print Network [OSTI]

stroke says Michel Torbey, MD, medical director of OSU Medical Center's Neurovascular Stroke Center. "That means calling 911 as soon as you recognize signs in yourself or in someone nearby." When a stroke is brain,'" Dr. Torbey explains. `aMeriCa's best' stroke Care When a stroke patient arrives at The Ohio

393

Energy efficiency standards for residential and commercial equipment: Additional opportunities  

SciTech Connect (OSTI)

Energy efficiency standards set minimum levels of energy efficiency that must be met by new products. Depending on the dynamics of the market and the level of the standard, the effect on the market for a given product may be small, moderate, or large. Energy efficiency standards address a number of market failures that exist in the buildings sector. Decisions about efficiency levels often are made by people who will not be responsible for the energy bill, such as landlords or developers of commercial buildings. Many buildings are occupied for their entire lives by very temporary owners or renters, each unwilling to make long-term investments that would mostly reward subsequent users. And sometimes what looks like apathy about efficiency merely reflects inadequate information or time invested to evaluate it. In addition to these sector-specific market failures, energy efficiency standards address the endemic failure of energy prices to incorporate externalities. In the U.S., energy efficiency standards for consumer products were first implemented in California in 1977. National standards became effective starting in 1988. By the end of 2001, national standards were in effect for over a dozen residential appliances, as well as for a number of commercial sector products. Updated standards will take effect in the next few years for several products. Outside the U.S., over 30 countries have adopted minimum energy performance standards. Technologies and markets are dynamic, and additional opportunities to improve energy efficiency exist. There are two main avenues for extending energy efficiency standards. One is upgrading standards that already exist for specific products. The other is adopting standards for products that are not covered by existing standards. In the absence of new and upgraded energy efficiency standards, it is likely that many new products will enter the stock with lower levels of energy efficiency than would otherwise be the case. Once in the stock, it is either impossible or more costly to improve the energy efficiency. Therefore, by not expanding or upgrading energy efficiency standards, opportunities for saving energy would be lost. In the past two decades, standards have significantly raised the level of energy efficiency for new products. How much more might be gained by making standards more stringent on products already subject to them, or by extending standards to products not yet covered? The main goal of this study is to estimate key national impacts of new and upgraded energy efficiency standards for residential and commercial equipment. These impacts approximate the opportunity for national benefits that may be lost if standards are not upgraded and expanded from current levels. This study also identifies the end uses where the largest opportunities exist. This analysis was prepared for the National Commission on Energy Policy (NCEP). It uses an analytical approach that is similar in concept to that used by the U.S. Department of Energy (DOE) to set standard levels. It relies on much less data and uses more simplified assumptions than the detailed and complex formulations used in DOE's standard-setting process. The results of this analysis should thus be viewed as a first approximation of the impacts that would actually be achieved by new standards. All monetary values in this report are in 2002 dollars.

Rosenquist, Greg; McNeil, Michael; Iyer, Maithili; Meyers, Steve; McMahon, Jim

2004-08-02T23:59:59.000Z

394

SLOPE STABILITY EVALUATION AND EQUIPMENT SETBACK DISTANCES FOR BURIAL GROUND EXCAVATIONS  

SciTech Connect (OSTI)

After 1970 Transuranic (TRU) and suspect TRU waste was buried in the ground with the intention that at some later date the waste would be retrieved and processed into a configuration for long term storage. To retrieve this waste the soil must be removed (excavated). Sloping the bank of the excavation is the method used to keep the excavation from collapsing and to provide protection for workers retrieving the waste. The purpose of this paper is to document the minimum distance (setback) that equipment must stay from the edge of the excavation to maintain a stable slope. This evaluation examines the equipment setback distance by dividing the equipment into two categories, (1) equipment used for excavation and (2) equipment used for retrieval. The section on excavation equipment will also discuss techniques used for excavation including the process of benching. Calculations 122633-C-004, 'Slope Stability Analysis' (Attachment A), and 300013-C-001, 'Crane Stability Analysis' (Attachment B), have been prepared to support this evaluation. As shown in the calculations the soil has the following properties: Unit weight 110 pounds per cubic foot; and Friction Angle (natural angle of repose) 38{sup o} or 1.28 horizontal to 1 vertical. Setback distances are measured from the top edge of the slope to the wheels/tracks of the vehicles and heavy equipment being utilized. The computer program utilized in the calculation uses the center of the wheel or track load for the analysis and this difference is accounted for in this evaluation.

MCSHANE DS

2010-03-25T23:59:59.000Z

395

Medical Plans for Medicare-Eligible Retirees  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubey MathematicaMeasuringMedical Plans Medical

396

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2.3: Sulfur Primer  

SciTech Connect (OSTI)

This deliverable is Subtask 2.3 of Task 2, Gas Cleanup Design and Cost Estimates, of NREL Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Subtask 2.3 builds upon the sulfur removal information first presented in Subtask 2.1, Gas Cleanup Technologies for Biomass Gasification by adding additional information on the commercial applications, manufacturers, environmental footprint, and technical specifications for sulfur removal technologies. The data was obtained from Nexant's experience, input from GTI and other vendors, past and current facility data, and existing literature.

Nexant Inc.

2006-05-01T23:59:59.000Z

397

Guidelines for Electromagnetic Interference Testing of Power Plant Equipment: Revision 3 to TR-102323  

SciTech Connect (OSTI)

To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I&C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner.

J. Cunningham and J. Shank

2004-11-01T23:59:59.000Z

398

Research position in maternity at Hannover Medical School, Hannover Medical School is one of the leading medical universities in Germany with  

E-Print Network [OSTI]

Research position in maternity at Hannover Medical School, Germany Hannover Medical School is one of the leading medical universities in Germany with excellent results in health care, research, education. In 2009, the only MSc Midwifery Programme in Germany was launched as part of the European Master

Manstein, Dietmar J.

399

User Experience in Medical Search Engines  

E-Print Network [OSTI]

User Experience in Medical Search Engines Róbert Andri Kristjánsson Kongens Lyngby 2014 IMM.imm.dtu.dk IMM-MSc-2014-???? #12;Summary (English) FindZebra.com is a specialized search engine for rare diseases that has been de- veloped to as an improvement to standard search engines. FindZebra.com has been shown

400

AIR CONDITIONER REQUEST EXTREME MEDICAL CIRCUMSTANCES  

E-Print Network [OSTI]

AIR CONDITIONER REQUEST DUE TO EXTREME MEDICAL CIRCUMSTANCES TO BE COMPLETED BY ATTENDING Moderate Significant Is the use of an air conditioner desirable Yes No OR essential Yes No to the management of allergy? Is the use of an air conditioner

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Contractor Employee Pension and Medical Benefits Policy  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To ensure that reimbursement of costs incurred by Department of Energy (DOE) contractors' pension and medical benefits are reasonable in accordance with applicable laws, regulations and contract requirements and reflect prudent business practices. This directive has been suspended as of June 19, 2006, for 1 year. For more information, see DOE N 251.66.

2006-06-19T23:59:59.000Z

402

Advanced Instruments, Inc. Applied Medical Resources  

E-Print Network [OSTI]

Cynosure Davol - C.R. Bard, Inc. Decision Resources DEKA Research and Development Corporation DePuy Spine, Inc. DocBox, Inc. Draeger Medical Systems, Inc. Eastman Kodak Company Eaton-Peabody Laboratory Elm USA-CMI GE Healthcare Gems Sensors Genzyme Corporation Goodyear-Veyance Technologies, Inc. Harvard

Vajda, Sandor

403

HEALTH AND MEDICAL RESEARCH STRATEGIC REVIEW  

E-Print Network [OSTI]

with the Health System, Including Allied Health And Primary Health Care 17 Theme Three: Scale, Scope engagement with the health system including Allied Health and Primary Health Care 28 Scale, scopeHEALTH AND MEDICAL RESEARCH STRATEGIC REVIEW ISSUES PAPER 29 OCTOBER 2012 #12;#12;CONTENTS The Vice

Viglas, Anastasios

404

Protecting Privacy in Computerized Medical Information  

E-Print Network [OSTI]

). #12;Foreword T he Clinton administration's health care reform proposal, announced by the President costs and improve health care delivery. By linking computerized health informa- tion through a national to improve patient care and expand resources for medical research and education, while lowering health care

McCurley, Kevin

405

SUMMER ARCHITECTURE ACADEMY HOUSING AND MEDICAL  

E-Print Network [OSTI]

SUMMER ARCHITECTURE ACADEMY HOUSING AND MEDICAL INFORMATION AND AUTHORIZATION FOR STUDENTS UNDER 18 YEARS OLD To: Summer Architecture Academy students and parents From: University of Oregon Department of Architecture We are looking forward to another exciting and educational Summer Architecture Academy. Many

406

Disbursement of $65 million to the State of Texas for construction of a Regional Medical Technology Center at the former Superconducting Super Collider Site, Waxahachie, Texas  

SciTech Connect (OSTI)

As part of a settlement agreement between the US DOE and the State of Texas, DOE proposes to transfer $65 million of federal funds to the Texas National Research Laboratory Commission (TNLRC) for construction of the Regional Medical Technology Center (RMTC) to be located in Ellis County, Texas. The RMTC would be a state-of-the-art medical facility for proton cancer therapy, operated by the State of Texas in conjunction with the University of Texas Southwestern Medical Center. The RMTC would use the linear accelerator assets of the recently terminated DOE Superconducting Super Collider Project to accelerate protons to high energies for the treatment of cancer patients. The current design provides for treatment areas, examination rooms, support laboratories, diagnostic imaging equipment, and office space as well as the accelerators (linac and synchrotron) and beam steering and shaping components. The potential environmental consequences of the proposed action are expected to be minor.

NONE

1995-05-01T23:59:59.000Z

407

Superior Processes at Industrial Equipment Manufacturers Benchmark best practices and performances for next-generation success  

E-Print Network [OSTI]

Superior Processes at Industrial Equipment Manufacturers Benchmark best practices and performances invest time, effort and resources in establishing the best practices, technology systems and solutions at a pace faster than the competition. Engaged people/human capital acquisition, development

Narasayya, Vivek

408

ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2013  

SciTech Connect (OSTI)

This report includes 47 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the fourth quarter of 2013.

Kurtz, J.; Sprik, S.; Peters, M.

2014-06-01T23:59:59.000Z

409

Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment  

E-Print Network [OSTI]

most state of the art reliability centered maintenance (RCM) approaches, but it also accounts equipment, maintenance, reliability, risk, security, optimization 1.Introduction Maintenance of bulk1 Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System

410

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies for Vehicles and Mobile Equipment  

Broader source: Energy.gov [DOE]

Once a Federal agency identifies the various strategic opportunities to reduce greenhouse gas (GHG) emissions for vehicles and mobile equipment, it is necessary to evaluate the associated costs of adopting each strategy.

411

Energy Comparison Vacuum Producing Equipment - Mechanical Vacuum Pumps vs. Steam Ejectors  

E-Print Network [OSTI]

vacuum on condensers, process reactors, or equipment and processes requiring subatmospheric conditions, has been to utilize steam ejectors. Due to the inherent operating inefficiency and wastefulness of the steam ejector, coupled with the rapidly...

Foisy, E. C.; Munkittrick, M. T.

1982-01-01T23:59:59.000Z

412

LBNL-53729-Revised After-hours Power Status of Office Equipment and  

E-Print Network [OSTI]

LBNL-53729-Revised After-hours Power Status of Office Equipment and Energy Use of Miscellaneous of Energy under Contract No. DE-AC03-76SF00098. #12;LBNL-53729-Revised i Table of Contents Table of Contents

413

E-Print Network 3.0 - airfoil section equipped Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: on a 36-inch chord NACA 23012 airfoil model equipped with pneumatic deicing boots. Molds were made... sec. The airfoil models all had a 1.5-ft chord and spanned the 3-...

414

Process centrifuge operating problems and equipment failures in canyon reprocessing facilities at the Savannah River Site  

SciTech Connect (OSTI)

The Savannah River Laboratory (SRL) maintains a compilation of operating problems and equipment failures that have occurred in the fuel reprocessing areas of the Savannah River Site (SRS). At present, the data bank contains more than 230,000 entries ranging from minor equipment malfunctions to incidents with the potential for injury or contamination of personnel, or for economic loss. The data bank has been used extensively for a wide variety of purposes, such as failure analyses, trend analyses, and preparation of safety analyses. Typical of the data are problems associated with the canyon process centrifuges. This report contains a compilation of the centrifuge operating problems and equipment failures primarily as an aid to organizations with related equipment. Publication of these data was prompted by a number of requests for this information by other Department of Energy (DOE) sites. 11 refs., 2 figs., 4 tabs.

Durant, W.S.; Baughman, D.F.

1990-03-01T23:59:59.000Z

415

Electric equipment providing space conditioning, water heating, and refrigeration consumes 12.5% of the nation's  

E-Print Network [OSTI]

Electric equipment providing space conditioning, water heating, and refrigeration consumes 12 are the heart of air conditioners, heat pumps, chillers, supermarket refrigeration systems, and more. Global use of vapor compression system configurations including multi-functional integrated heat pumps, multi

Oak Ridge National Laboratory

416

VALVE FUNNEL SPRING PIN PRESS PERFORMANCE AND FUNCTIONAL REQUIREMENTS EVALUATION FOR SPECIAL TOOLS AND EQUIPMENT  

SciTech Connect (OSTI)

This evaluation allows use of the valve funnel spring pin press and describes appropriate handling instructions for the tool. The engineering evaluation is required for operations and field use of special tools and equipment.

WITHERSPOON JT

2009-12-30T23:59:59.000Z

417

Safety First Safety AlwaysSafety Last Using abrasive wheel equipment exposes you to many  

E-Print Network [OSTI]

Safety First Safety AlwaysSafety Last Using abrasive wheel equipment exposes you to many potential and strength and meet all manufacturer specifications. Abrasive Wheel Machinery and Tools Safety Tip #1

Minnesota, University of

418

Design Concepts for Power Distribution Equipment Serving Non-Linear Loads  

E-Print Network [OSTI]

This paper explores the effects of power system harmonics induced by non-sinusoidal loads on electrical distribution equipment. The first portion examines the harmonic phenomenon to more fully understand harmonic current behavior from an intuitive...

Massey, G. W.

419

EA-1774: Energy Conservation Program: Energy Conservation Standards for Direct Heating Equipment  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the adoption of amended energy conservation standards as required by The Energy Policy and Conservation Act, as amended) for direct heating equipment,...

420

A regression approach to infer electricity consumption of legacy telecom equipment  

E-Print Network [OSTI]

A regression approach to infer electricity consumption of legacy telecom equipment [Extended and communications technology accounts for a significant fraction of worldwide electricity consumption. Given inferring the electricity consumption of different components of the installed base of telecommu- nications

Fisher, Kathleen

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Vit Plant receives and sets key air filtration equipment for Low Activity Waste Facility  

Broader source: Energy.gov [DOE]

WTP lifted a nearly 100-ton carbon bed absorber into the Low-Activity Waste Facility. This key piece of air-filtration equipment will remove mercury and acidic gases before air is channeled through...

422

E-Print Network 3.0 - autoclave coring equipment Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Core's animal facilities on the campus... Research Core - LARC Page 2 of 2 PROCEDURES A. Daily AutoclaveRack & cage Washer Monitoring a. A chemical... of equipment or...

423

2014-02-21 Issuance: Test Procedure for Commercial Water Heating Equipment; Request for Information  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register request for information regarding test procedures for commercial water heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency (February 21, 2014).

424

Evaluating Equipment Performance Using SCADA/PMS Data for Thermal Utility Plants - Case Studies  

E-Print Network [OSTI]

The equipment in cogeneration plants and thermal energy plants such as gas tubing generators, boilers, steam turbine generators, chillers and cooling towers are often critical to satisfying building needs. Their actual energy performance is very...

Deng, X.; Chen, Q.; Xu, C.

2007-01-01T23:59:59.000Z

425

Departments of Central Receiving -Surplus Property Equipment Accountability Change Request (EACR) Form  

E-Print Network [OSTI]

and radioactive material. SECTION 4 This EACR contains any of the following: Freezers, Refrigerators, a Freezer, Refrigerator, and Laboratory Equipment Declaration Form will be attached to this EACR. This form

426

Analysis and reduction of excess inventory at a heavy equipment manufacturing facility  

E-Print Network [OSTI]

The research presented in this thesis explores two hypotheses focused on excess inventory at a heavy equipment manufacturing facility. The scope of the thesis includes inventory in the form of raw materials, purchased ...

Romanov, Alexander, M.B.A. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

427

The design and manufacture of mass production equipment for a pencil with a seed  

E-Print Network [OSTI]

Autosprout is the mass manufacturing equipment envisioned to produce Sprout, a pencil with a seed. This pencil concept was developed by MIT students a successful round of funding and first production run through Kickstarter. ...

Del Castillo, Eric A. (Eric Anthony)

2013-01-01T23:59:59.000Z

428

Environmental and Resource Studies Program Equipment Available For Use in ERS Courses  

E-Print Network [OSTI]

microscopes, dissecting mixers/homogenizers muffle furnace (high temperature) ovens/incubators pH meters (battery tester) power inverter solar panel and solar charge controller Audio-Visual Equipment camera

Fox, Michael

429

Concept study: Use of grout vaults for disposal of long-length contaminated equipment  

SciTech Connect (OSTI)

Study considers the potential for use of grout vaults for disposal of untreated long length equipment removed from waste tanks. Looks at ways to access vaults, material handling, regulatory aspects, and advantages and disadvantages of vault disposal.

Clem, D.K.

1994-09-21T23:59:59.000Z

430

E-Print Network 3.0 - apc cutting equipment Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Refurbishment Of An Existing Hazardous Waste Incinerator In Eastern Germany On a Tum-Key Contract Basis Summary: of erection of the new rotary kiln and remaining BOP-equipment...

431

ARRA Material Handling Equipment Composite Data Products: Data through Quarter 2 of 2012  

SciTech Connect (OSTI)

This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the second quarter of 2012.

Kurtz, J.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-10-01T23:59:59.000Z

432

Dispensing Equipment Testing with Mid-Level Ethanol/Gasoline Test Fluid: Summary Report  

SciTech Connect (OSTI)

The National Renewable Energy Laboratory's (NREL) Nonpetroleum-Based Fuel Task addresses the hurdles to commercialization of biomass-derived fuels and fuel blends. One such hurdle is the unknown compatibility of new fuels with current infrastructure, such as the equipment used at service stations to dispense fuel into automobiles. The U.S. Department of Energy's (DOE) Vehicle Technology Program and the Biomass Program have engaged in a joint project to evaluate the potential for blending ethanol into gasoline at levels higher than nominal 10 volume percent. This project was established to help DOE and NREL better understand any potentially adverse impacts caused by a lack of knowledge about the compatibility of the dispensing equipment with ethanol blends higher than what the equipment was designed to dispense. This report provides data about the impact of introducing a gasoline with a higher volumetric ethanol content into service station dispensing equipment from a safety and a performance perspective.

Boyce, K.; Chapin, J. T.

2010-11-01T23:59:59.000Z

433

ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2012  

SciTech Connect (OSTI)

This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the fourth quarter of 2012.

Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.; Ramsden, T.

2013-05-01T23:59:59.000Z

434

ARRA Material Handling Equipment Composite Data Products: Data through Quarter 2 of 2013  

SciTech Connect (OSTI)

This report includes 47 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the second quarter of 2013.

Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.

2013-11-01T23:59:59.000Z

435

Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards for Commercial Warm Air Furnaces, Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards for Commercial Warm Air Furnaces, Notice of Proposed Rulemaking

436

Energy Conservation Program for Consumer Products: Energy Conservation Standards for Direct Heating Equipment and Pool Heaters, Request for Information  

Broader source: Energy.gov [DOE]

Energy Conservation Program for Consumer Products: Energy Conservation Standards for Direct Heating Equipment and Pool Heaters, Request for Information

437

Remote Handling Equipment for a High-Level Waste Waste Package Closure System  

SciTech Connect (OSTI)

High-level waste will be placed in sealed waste packages inside a shielded closure cell. The Idaho National Laboratory (INL) has designed a system for closing the waste packages including all cell interior equipment and support systems. This paper discusses the material handling aspects of the equipment used and operations that will take place as part of the waste package closure operations. Prior to construction, the cell and support system will be assembled in a full-scale mockup at INL.

Kevin M. Croft; Scott M. Allen; Mark W. Borland

2006-04-01T23:59:59.000Z

438

Developing ''SMART'' equipment and systems through collaborative NERI research and development  

SciTech Connect (OSTI)

The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of: (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased finding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the ``Smart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations''. This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABB CENP), Sandia National Laboratories, Duke Engineering and Services (DE and S), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of smart equipment and predictive maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the Smart Equipment program will: (1) Identify and prioritize nuclear plant equipment that would most likely benefit from adding smart features; (2) Develop a methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i.e. smart equipment); (3) Develop a methodology to provide plant operators with real-time information through smart equipment Man-Machine Interfaces (MMI) to support their decision making; (4) Demonstrate the methodology on a targeted component and/or system; (5) Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed subtask plans for the entire program, including expected achievements, (2) preliminary results from the early program phases and (3) the program's relationship to other NERI programs being conducted by the same team.

HARMON,DARYL L.; CHAPMAN,LEON D.; GOLAY,MICHAEL W.; MAYNARD,KENNETH P.; SPENCER,JOSEPH W.

2000-06-05T23:59:59.000Z

439

An Analysis of Price Determination and Markups in the Air-Conditioning and Heating Equipment Industry  

SciTech Connect (OSTI)

In this report we calculate the change in final consumer prices due to minimum efficiency standards, focusing on a standard economic model of the air-conditioning and heating equipment (ACHE) wholesale industry. The model examines the relationship between the marginal cost to distribute and sell equipment and the final consumer price in this industry. The model predicts that the impact of a standard on the final consumer price is conditioned by its impact on marginal distribution costs. For example, if a standard raises the marginal cost to distribute and sell equipment a small amount, the model predicts that the standard will raise the final consumer price a small amount as well. Statistical analysis suggest that standards do not increase the amount of labor needed to distribute equipment the same employees needed to sell lower efficiency equipment can sell high efficiency equipment. Labor is a large component of the total marginal cost to distribute and sell air-conditioning and heating equipment. We infer from this that standards have a relatively small impact on ACHE marginal distribution and sale costs. Thus, our model predicts that a standard will have a relatively small impact on final ACHE consumer prices. Our statistical analysis of U.S. Census Bureau wholesale revenue tends to confirm this model prediction. Generalizing, we find that the ratio of manufacturer price to final consumer price prior to a standard tends to exceed the ratio of the change in manufacturer price to the change in final consumer price resulting from a standard. The appendix expands our analysis through a typical distribution chain for commercial and residential air-conditioning and heating equipment.

Dale, Larry; Millstein, Dev; Coughlin, Katie; Van Buskirk, Robert; Rosenquist, Gregory; Lekov, Alex; Bhuyan, Sanjib

2004-01-30T23:59:59.000Z

440

Water Efficiency Improvements At Various Environmental Protection Agency Sites: Best Management Practices Case Study #12 „ Laboratory/Medical Equipment (Brochure), Federal Energy Management Program (FEMP)  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of| Department ofDepartment of Energy Watch it Live at 1pm:Environmental

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Regulatory issues associated with closure of the Hanford AX Tank Farm ancillary equipment  

SciTech Connect (OSTI)

Liquid mixed, high-level radioactive waste has been stored in underground single-shell tanks at the US Department of Energy`s (DOE`s) Hanford Site. After retrieval of the waste from the single-shell tanks, the DOE will proceed with closure of the tank farm. The 241-AX Tank Farm includes four one-million gallon single-shell tanks in addition to sluice lines, transfer lines, ventilation headers, risers, pits, cribs, catch tanks, buildings, well and associated buried piping. This equipment is classified as ancillary equipment. This document addresses the requirements for regulatory close of the ancillary equipment in the Hanford Site 241-AX Tank Farm. The options identified for physical closure of the ancillary equipment include disposal in place, disposal in place after treatment, excavation and disposal on site in an empty single-shell tank, and excavation and disposal outside the AX Tank Farm. The document addresses the background of the Hanford Site and ancillary equipment in the AX Tank Farm, regulations for decontamination and decommissioning of radioactively contaminated equipment, requirements for the cleanup and disposal of radioactive wastes, cleanup and disposal requirements governing hazardous and mixed waste, and regulatory requirements and issues associated with each of the four physical closure options. This investigation was conducted by the Sandia National Laboratories, Albuquerque, New Mexico, during Fiscal Year 1998 for the Hanford Tanks Initiative Project.

Becker, D.L.

1998-09-02T23:59:59.000Z

442

Power levels in office equipment: Measurements of new monitors and personal computers  

SciTech Connect (OSTI)

Electronic office equipment has proliferated rapidly over the last twenty years and is projected to continue growing in the future. Efforts to reduce the growth in office equipment energy use have focused on power management to reduce power consumption of electronic devices when not being used for their primary purpose. The EPA ENERGY STAR[registered trademark] program has been instrumental in gaining widespread support for power management in office equipment, and accurate information about the energy used by office equipment in all power levels is important to improving program design and evaluation. This paper presents the results of a field study conducted during 2001 to measure the power levels of new monitors and personal computers. We measured off, on, and low-power levels in about 60 units manufactured since July 2000. The paper summarizes power data collected, explores differences within the sample (e.g., between CRT and LCD monitors), and discusses some issues that arise in m etering office equipment. We also present conclusions to help improve the success of future power management programs.Our findings include a trend among monitor manufacturers to provide a single very low low-power level, and the need to standardize methods for measuring monitor on power, to more accurately estimate the annual energy consumption of office equipment, as well as actual and potential energy savings from power management.

Roberson, Judy A.; Brown, Richard E.; Nordman, Bruce; Webber, Carrie A.; Homan, Gregory H.; Mahajan, Akshay; McWhinney, Marla; Koomey, Jonathan G.

2002-05-14T23:59:59.000Z

443

NFC Industrial Access and Equipment Rates valid 7/1/13 to 6/30/14 RATES SUBJECT TO CHANGE  

E-Print Network [OSTI]

NFC Industrial Access and Equipment Rates valid 7/1/13 to 6/30/14 RATES SUBJECT TO CHANGE ACCESS/USE UNITS RATE ACCESS FEE monthly fee $91.00 LAB USAGE FEE per lab session $67.50 LAB USAGE MAX PER MONTH per month $631.00 EQUIPMENT INCLUDED EQUIPMENT UNITS RATE ALDATOMIC LAYER DEP ALD Savannah 200 minute

Amin, S. Massoud

444

NFC Academic Access and Equipment Rates valid 7/1/13 to 6/30/14 RATES SUBJECT TO CHANGE  

E-Print Network [OSTI]

NFC Academic Access and Equipment Rates valid 7/1/13 to 6/30/14 RATES SUBJECT TO CHANGE ACCESS/USE UNITS RATE ACCESS FEE monthly fee $29.20 LAB USAGE FEE per lab session $24.44 LAB USAGE MAX PER MONTH per month $224.72 EQUIPMENT INCLUDED EQUIPMENT UNITS RATE 50% Rate Reduction After 500 min

Amin, S. Massoud

445

Wildfire Suppression Equipment Engines CSFS has placed 140 federal excess property vehicles located throughout the state. Our  

E-Print Network [OSTI]

Wildfire Suppression Equipment Engines ­ CSFS has placed 140 federal excess property vehicles fire engines and provides all major maintenance. The all-wheel drive (4x4 and 6x6) engines are equipped equipment such as hose, nozzles, and hand tools. These engines are inspected annually and updated

446

VI-19.00(A) UNIVERSITY OF MARYLAND POLICY ON PROTECTIVE EQUIPMENT PROGRAM APPROVED BY THE PRESIDENT, January 19, 1999  

E-Print Network [OSTI]

could result in injury or illness. Personal Protective Equipment (PPE): Devices worn by the employees, January 19, 1999 I. POLICY STATEMENT A. Purpose The Personal Protective Equipment (PPE) Program has been OSHA Regulation 29 CFR Part 1910 Subpart I - Personal Protective Equipment. D. Department

Rubloff, Gary W.

447

Former worekrs' notification adn medical screening Hanford  

SciTech Connect (OSTI)

CPWR is carrying out a screening program for former Hanford construction workers. This program includes continuing screening and re-screening services for the former worker population. The Program contains the following general components: Start-up planning/needs assessment: A modified exposure assessment will be conducted to identify high-risk buildings or areas, primary exposures, and worker populations at risk. Outreach: CPWR, as the research arm of the Building and Construction Trades Department, AFL-CIO, has direct access to workers. CPWR will rely on direct mailings to lists of former workers, and work through and rely on existing organizations (unions, union pension funds, employers, DOE site administrators, etc.) to reach former workers and "get the word out." CPWR will establish/maintain an outreach office at each site listed above. This office will serve as the face of the Program to workers and their communities. Communications and intake center: CPWR has two established toll-free phone numbers (1-800-866-9663 and 1-888-464-0009). There is also a dedicated website for the program (btmed.org). Workers can register with the Program by mail, telephone, or on-line. Work history: A standardized, structured work history is administered with modules that accommodate unique exposure scenarios for different occupations and different DOE sites. A work history interview is administered by a trained program interviewer. The work histories are used to determine whether a participant is eligible for the medical examination and to interpret the findings from the medical examination. Medical evaluation: The Program contracts with local medical providers qualified to deliver occupational medical screening services. All providers are credentialed. The Program contracts with a certified national laboratory and with NIOSH certified B-readers to review x-rays. Based on the work history, the participant is referred to a credentialed medical provider who is located close to the participant's home. If it is not convenient to use a credentialed provider, the Program will make arrangements, if necessary, for the participant to receive a physical exam through the National Supplemental Screening Program. Eligible participants will receive the same core medical exam (including a Beryllium Lymphocyte Proliferation Test, BeLPT), and in addition, based on their work history, they may be assigned to exposure specific modules for asbestos, silica, lead, noise, cadmium, and chromium. Lab work will be sent to a national laboratory for processing, except the blood samples for the BeLPT, which will be sent to a DOE-approved laboratory for evaluation. Determination of work-relatedness and follow-up: A letter of findings will be sent to the participant within 60 days of the exam. The letter is written and/or reviewed by occupational medical health personnel with knowledge of the DOE site(s) where the participant has worked and will include specific follow-up recommendations. Urgent findings are followed up by the provider without delay. Evaluation and quality assurance: All data are entered into the Program Data Management System (DMS). The DMS is web-based and relies on electronic submission of results, whenever possible. A de-identified data set on all participants is provided to Duke University Medical Center for evaluation and analysis. Each participant is asked to complete a satisfaction survey. The DMS will be used for quality assurance purposes and to also report summary data to the DOE. The BTMED.ORG website is encrypted using the industry-standard Secure Sockets Layer (SSL) technology (128-bit encryption keys). Each individual that accesses the website is assigned a unique login ID, password, and token. Passwords are required to meet standards for "strength," including minimum length, multi-case, and use of numbers. The website is also protected by additional security layers including additional encryption, hardware and software firewalls, Virtual Private Networks (VPNs), and virus protection.

Patricia Quinn

2005-11-30T23:59:59.000Z

448

Strategic inventory management of externally sourced medical devices  

E-Print Network [OSTI]

The purpose of this research was to determine inventory strategies for externally sourced medical devices. In the medical device industry, the desire for high levels of customer service often results in less than optimal ...

Hillstrom, Nichole L. (Nichole Leigh)

2013-01-01T23:59:59.000Z

449

Jackson Park Hospital Green Building Medical Center  

SciTech Connect (OSTI)

Jackson Park Hospital completed the construction of a new Medical Office Building on its campus this spring. The new building construction has adopted the City of Chicago's recent focus on protecting the environment, and conserving energy and resources, with the introduction of green building codes. Located in a poor, inner city neighborhood on the South side of Chicago, Jackson Park Hospital has chosen green building strategies to help make the area a better place to live and work. The new green building houses the hospital's Family Medicine Residency Program and Specialty Medical Offices. The residency program has been vital in attracting new, young physicians to this medically underserved area. The new outpatient center will also help to allure needed medical providers to the community. The facility also has areas designated to women's health and community education. The Community Education Conference Room will provide learning opportunities to area residents. Emphasis will be placed on conserving resources and protecting our environment, as well as providing information on healthcare access and preventive medicine. The new Medical Office Building was constructed with numerous energy saving features. The exterior cladding of the building is an innovative, locally-manufactured precast concrete panel system with integral insulation that achieves an R-value in excess of building code requirements. The roof is a 'green roof' covered by native plantings, lessening the impact solar heat gain on the building, and reducing air conditioning requirements. The windows are low-E, tinted, and insulated to reduce cooling requirements in summer and heating requirements in winter. The main entrance has an air lock to prevent unconditioned air from entering the building and impacting interior air temperatures. Since much of the traffic in and out of the office building comes from the adjacent Jackson Park Hospital, a pedestrian bridge connects the two buildings, further decreasing the amount of unconditioned air that enters the office building. The HVAC system has an Energy Efficiency Rating 29% greater than required. No CFC based refrigerants were used in the HVAC system, thus reducing the emission of compounds that contribute to ozone depletion and global warming. In addition, interior light fixtures employ the latest energy-efficient lamp and ballast technology. Interior lighting throughout the building is operated by sensors that will automatically turn off lights inside a room when the room is unoccupied. The electrical traction elevators use less energy than typical elevators, and they are made of 95% recycled material. Further, locally manufactured products were used throughout, minimizing the amount of energy required to construct this building. The primary objective was to construct a 30,000 square foot medical office building on the Jackson Park Hospital campus that would comply with newly adopted City of Chicago green building codes focusing on protecting the environment and conserving energy and resources. The energy saving systems demonstrate a state of the-art whole-building approach to energy efficient design and construction. The energy efficiency and green aspects of the building contribute to the community by emphasizing the environmental and economic benefits of conserving resources. The building highlights the integration of Chicago's new green building codes into a poor, inner city neighborhood project and it is designed to attract medical providers and physicians to a medically underserved area.

William Dorsey; Nelson Vasquez

2010-03-31T23:59:59.000Z

450

Medical Exam Scheduling - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping the NanoscaleMechanical BehaviorSummerwelcome day

451

Medical Exams - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping the NanoscaleMechanical BehaviorSummerwelcome dayOccupational

452

Medical Monitoring Exam - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping the NanoscaleMechanical BehaviorSummerwelcome

453

Microsoft Word - 2015_AdultMedical.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMappingENVIRONMENTAL IMPACT STATEMENT COMMENTStorageProjects

454

Microsoft Word - 2015_StudentMedical.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMappingENVIRONMENTAL IMPACT STATEMENTbelow). U.S. DEPARTMENT OF

455

Jackson Park Hospital Green Building Medical Center  

SciTech Connect (OSTI)

Jackson Park Hospital completed the construction of a new Medical Office Building on its campus this spring. The new building construction has adopted the City of Chicagoâ??s recent focus on protecting the environment, and conserving energy and resources, with the introduction of green building codes. Located in a poor, inner city neighborhood on the South side of Chicago, Jackson Park Hospital has chosen green building strategies to help make the area a better place to live and work.

William Dorsey; Nelson Vasquez

2010-03-01T23:59:59.000Z

456

ORISE Resources: Radiation Treatment Medication Package Inserts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory | NationalJohnSecurityControlsOMBRadiation Treatment Medication

457

Coordinating Pediatric Medical Care during an Influenza Pandemic - Hospital Workbook  

SciTech Connect (OSTI)

This workbook is intended to assist hospitals with coordinating medical care for pediatric influenza-like illness across their community.

HCTT CHE

2010-01-01T23:59:59.000Z

458

Texas AgriLife Extension Service Procedure 21.01.08.X1.05 Farm Equipment Operation and Maintenance Page 1 of 1  

E-Print Network [OSTI]

and oil filter replacement, air filter replacement, battery check) on equipment. C. Retain maintenance.6.1 by the equipment item in accordance with the System Records Retention Schedule Section 5.6. D. House equipment

459

0 | P a g e Economic Impact of Medical  

E-Print Network [OSTI]

for Consideration 7 Economic Impact Evaluation of Medical School Models 8 Facility Considerations 10 Key Findings 110 | P a g e Economic Impact of Medical Education Expansion in Nevada EconomicImpact Assessment Table of Contents Page Introduction 2 Evaluation of Market Needs 3 Medical School Models

Walker, Lawrence R.

460

Medical Schedule of Benefits Johns Hopkins Student Health Program  

E-Print Network [OSTI]

and Serum 80% 80% of R&C Ambulance Transportation Medically Necessary Transport 80% 80% of R&C Chemotherapy% 80% of R&C Medically Necessary Hearing Aids for dependent children up to age 26 (limited to every 36, X-Ray Exams, and Ultrasound 90% 70% of R&C Medical Supplies Disposable Supplies (e.g. ostomy bags

Niebur, Ernst

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Institute for Frontier Medical Sciences Annual Report 2007  

E-Print Network [OSTI]

#12;#12;! Institute for Frontier Medical Sciences #12;! " # Annual Report 2007 #12;Institute for Frontier Medical Sciences #12;! Prof. Kazuhiro Nagata Annual Report 2007 #12;hsp47 hsp47 hsp47 Institute for Frontier Medical Sciences #12;! ! Mol. Biol. Cell. via Mol. Biol. Cell. Stroke Annual Report 2007 #12

Takada, Shoji

462

University of Glasgow COURSE IN FORENSIC MEDICAL SCIENCES  

E-Print Network [OSTI]

University of Glasgow COURSE IN FORENSIC MEDICAL SCIENCES 2014 - 15 please turn over Information range of topics within the general theme of forensic medical sciences. The emphasis is on medical aspects of forensic practice, but with important contributions in forensic science and the legal process

Glasgow, University of

463

BENEFITS OF VIBRATION ANALYSIS FOR DEVELOPMENT OF EQUIPMENT IN HLW TANKS - 12341  

SciTech Connect (OSTI)

Vibration analyses of equipment intended for use in the Savannah River Site (SRS) radioactive liquid waste storage tanks are performed during pre-deployment testing and has been demonstrated to be effective in reducing the life-cycle costs of the equipment. Benefits of using vibration analysis to identify rotating machinery problems prior to deployment in radioactive service will be presented in this paper. Problems encountered at SRS and actions to correct or lessen the severity of the problem are discussed. In short, multi-million dollar cost saving have been realized at SRS as a direct result of vibration analysis on existing equipment. Vibration analysis of equipment prior to installation can potentially reduce inservice failures, and increases reliability. High-level radioactive waste is currently stored in underground carbon steel waste tanks at the United States Department of Energy (DOE) Savannah River Site and at the Hanford Site, WA. Various types of rotating machinery (pumps and separations equipment) are used to manage and retrieve the tank contents. Installation, maintenance, and repair of these pumps and other equipment are expensive. In fact, costs to remove and replace a single pump can be as high as a half million dollars due to requirements for radioactive containment. Problems that lead to in-service maintenance and/or equipment replacement can quickly exceed the initial investment, increase radiological exposure, generate additional waste, and risk contamination of personnel and the work environment. Several different types of equipment are considered in this paper, but pumps provide an initial example for the use of vibration analysis. Long-shaft (45 foot long) and short-shaft (5-10 feet long) equipment arrangements are used for 25-350 horsepower slurry mixing and transfer pumps in the SRS HLW tanks. Each pump has a unique design, operating characteristics and associated costs, sometimes exceeding a million dollars. Vibration data are routinely collected during pre-installation tests and screened for: Critical speeds or resonance, Imbalance of rotating parts, Shaft misalignment, Fluid whirl or lubrication break down, Bearing damages, and Other component abnormalities. Examples of previous changes in operating parameters and fabrication tolerances and extension of equipment life resulting from the SRS vibration analysis program include: (1) Limiting operational speeds for some pumps to extend service life without design or part changes; (2) Modifying manufacturing methods (tightening tolerances) for impellers on slurry mixing pumps based on vibration data that indicated hydraulic imbalance; (3) Identifying rolling element mounting defects and replacing those components in pump seals before installation; and (4) Identifying the need for bearing design modification for SRS long-shaft mixing pump designs to eliminate fluid whirl and critical speeds which significantly increased the equipment service life. In addition, vibration analyses and related analyses have been used during new equipment scale-up tests to identify the need for design improvements for full-scale operation / deployment of the equipment in the full size tanks. For example, vibration analyses were recently included in the rotary micro-filtration scale-up test program at SRNL.

Stefanko, D.; Herbert, J.

2012-01-10T23:59:59.000Z

464

E-Print Network 3.0 - ahip medical library Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

libraries Authors: Gheorghe Bulu 1 , Crina Mih... for the medical community. The Romanian medical higher education libraries are in a period of analysis... by the medical ......

465

E-Print Network 3.0 - annual meeting medical Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

annual meeting medical Page: << < 1 2 3 4 5 > >> 1 Annual Report of the Institute for Frontier Medical Sciences Kyoto University Summary: Conference Medical Applications of Novel...

466

Current state of commercial radiation detection equipment for homeland security applications.  

SciTech Connect (OSTI)

With the creation of the U.S. Department of Homeland Security (DHS) came the increased concern that terrorist groups would attempt to manufacture and use an improvised nuclear device or radiological dispersal device. As such, a primary mission of DHS is to protect the public against the use of these devices and to assist state and local responders in finding, locating, and identifying these types of devices and materials used to manufacture these devices. This assistance from DHS to state and local responders comes in the form of grant money to procure radiation detection equipment. In addition to this grant program, DHS has supported the development of American National Standards Institute standards for radiation detection equipment and has conducted testing of commercially available instruments. This paper identifies the types and kinds of commercially available equipment that can be used to detect and identify radiological material - for use in traditional search applications as well as primary and secondary screening of personnel, vehicles, and cargo containers. In doing so, key considerations for the conduct of operations are described as well as critical features of the instruments for specific applications. The current state of commercial instruments is described for different categories of detection equipment including personal radiation detectors, radioisotope identifiers, man-portable detection equipment, and radiation portal monitors. In addition, emerging technologies are also discussed, such as spectroscopic detectors and advanced spectroscopic portal monitors.

Klann, R. T.; Shergur, J.; Mattesich, G.; Nuclear Engineering Division; DHS

2009-10-01T23:59:59.000Z

467

Guide to good practices for control of equipment and system status  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Control of Equipment and System Status, Chapter VIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing equipment and system status control programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Control of Equipment and System Status is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the need for a formal status control program to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

468

Monitoring equipment environment during nuclear plant operation at Salem and Hope Creek generating stations  

SciTech Connect (OSTI)

Monitoring of environmental parameters has become a significant issue for operating nuclear power plants. While the long-term benefits of plant life extension programs are being pursued with comprehensive environmental monitoring programs, the potential effect of local hot spots at various plant locations needs to be evaluated for its effect on equipment degradation and shortening of equipment qualified life. A significant benefit can be experienced from temperature monitoring when a margin exists between the design versus actual operating temperature. This margin can be translated into longer equipment qualified life and significant reduction in maintenance activities. At PSE and G, the immediate need for monitoring environmental parameters is being accomplished via the use of a Logic Beach Bitlogger. The Bitlogger is a portable data loggings system consisting of a system base, input modules and a communication software package. Thermocouples are installed on selected electrical equipment and cables are run from the thermocouples to the input module of the Bitlogger. Temperature readings are taken at selected intervals, stored in memory, and downloaded periodically to a PC software program, i.e., Lotus. The data is formatted into tabular or graphical documents. Because of their versatility, Bitloggers are being used differently at the authors Nuclear facility. At the Salem Station (2 Units-4 loop Westinghouse PWR), a battery powered, fully portable, calibrated Bitlogger is located in an accessible area inside Containment where it monitors the temperature of various electrical equipment within the Pressurizer Enclosure. It is planned that close monitoring of the local hot spot temperatures in this area will allow them to adjust and reconcile the environmental qualification of the equipment.

Blum, A.; Smith, R.J. [Public Service Electric and Gas Co., Hancocks Bridge, NJ (United States)

1991-06-01T23:59:59.000Z

469

Efficiency improvements in US Office equipment: Expected policy impacts and uncertainties  

SciTech Connect (OSTI)

This report describes a detailed end-use forecast of office equipment energy use for the US commercial sector. We explore the likely impacts of the US Environmental Protection Agency`s ENERGY STAR office equipment program and the potential impacts of advanced technologies. The ENERGY STAR program encourages manufacturers to voluntarily incorporate power saving features into personal computers, monitors, printers, copiers, and fax machines in exchange for allowing manufacturers to use the EPA ENERGY STAR logo in their advertising campaigns. The Advanced technology case assumes that the most energy efficient current technologies are implemented regardless of cost.

Koomey, J.G.; Cramer, M.; Piette, M.A.; Eto, J.H.

1995-12-01T23:59:59.000Z

470

Shared-savings firm goes out of business: PMI users left with unserviced, malfunctioning equipment  

SciTech Connect (OSTI)

Some customers of Performance Management Inc. (PMI) are left with non-functioning and the possible removal of equipment now that the shared-savings financing firm has gone out of business. PMI's departure from the contracts leaves no service or maintenance funds for the 50 to 100 installations in the field. Officials from most of the equipment manufacturers denied knowledge of PMI, which dealt only with independent installers and customers under a contract that called for users to share energy savings with PMI in exchange for PMI financing for installation and service. (DCK)

Galvin, C.

1983-05-23T23:59:59.000Z

471

Confirmation of the seismic resistance of nuclear power plant equipment after assembly  

SciTech Connect (OSTI)

It is shown that the natural frequencies and damping decrements of nuclear power plant equipment can only be determined experimentally and directly at the power generation units (reactors) of nuclear power plants under real disassembly conditions for the equipment, piping network, thermal insulation, etc. A computational experimental method is described in which the natural frequencies and damping decrements are determined in the field and the seismic resistance is reevaluated using these values. This method is the basis of the standards document 'Methods for confirming the dynamic characteristics of systems and components of the generating units of nuclear power plants which are important for safety' prepared and introduced in 2012.

Kaznovsky, P. S.; Kaznovsky, A. P.; Saakov, E. S.; Ryasnyj, S. I. [JSC 'Atomtehenergo' (Russian Federation)

2013-05-15T23:59:59.000Z

472

Cogeneration at Iowa Methodist Medical Center  

E-Print Network [OSTI]

Medical Center of Des Moines, Iowa, is installing two 1,500 kW Fairbanks Morse turbocharged dual-fuel reciprocating engine generators. The system will be installed with re covery of exhaust waste heat as steam and jacket, lube Oil, and intercooler... outages or duri g peak thermal loads. Backup and peaking power capa ity is generally a provision of the interconnection gree ment with the electric utility. Provisions m st also be made to remove excess waste heat to b lance thermal production...

Thunem, C. B.; Schebler, S. J.; Love, G. I.

473

ORISE: REAC/TS Radiation Treatment Medications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory |CHEMPACK MappingHistoryMedical Management ofIncident Victim

474

ORISE: The Medical Aspects of Radiation Incidents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory |CHEMPACKRadiological programStandards development ForThe Medical

475

Association of Medical Editors (WAME) and  

E-Print Network [OSTI]

I am indeed delighted to say that we are entering in the world of biomedical communications through the Journal of Clinical & Experimental Research (JCER), a multidisciplinary, peer reviewed, open access, online & print journal which invites submission of high quality manuscripts from all the medical disciplines in the field of clinical and experimental research. As the standard of a journal depends on its contributors, the JCER expects submission of scholarly manuscripts from the researchers. The JCER will follow the publication ethics guidelines developed by the International Committee of

Dinesh M. Parmar

476

Medical Plans for Non-Medicare Retirees  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubey MathematicaMeasuringMedical Plans

477

Medical Testing and Surveillance Facilities - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubey MathematicaMeasuringMedical PlansAbout Us >

478

TANKS 18 AND 19-F EQUIPMENT GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS  

SciTech Connect (OSTI)

The United States Department of Energy (US DOE) intends to remove Tanks 18-F and 19-F at the Savannah River Site (SRS) from service. The high-level waste (HLW) tanks have been isolated from the F-area Tank Farm (FTF) facilities and will be filled with cementitious grout for the purpose of: (1) physically stabilizing the empty volumes in the tanks, (2) limiting/eliminating vertical pathways from the surface to residual waste on the bottom of the tanks, (3) providing an intruder barrier, and (4) providing an alkaline, chemical reducing environment within the closure boundary to limit solubility of residual radionuclides. Bulk waste and heel waste removal equipment will remain in Tanks 18-F and 19-F when the tanks are closed. This equipment includes: mixer pumps, transfer pumps, transfer jets, equipment support masts, sampling masts and dip tube assemblies. The current Tank 18-F and 19-F closure strategy is to grout the internal void spaces in this equipment to eliminate fast vertical pathways and slow water infiltration to the residual material on the tank floor. This report documents the results of laboratory testing performed to identify a grout formulation for filling the abandoned equipment in Tanks 18-F and 19-F. The objective of this work was to formulate a flowable grout for filling internal voids of equipment that will remain in Tanks 18-F and 19-F during the final closures. This work was requested by V. A. Chander, Tank Farm Closure Engineering, in HLW-TTR-2011-008. The scope for this task is provided in the Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The specific objectives of this task were to: (1) Prepare and evaluate the SRR cooling coil grout identified in WSRC-STI-2008-00298 per the TTR for this work. The cooling coil grout is a mixture of BASF MasterFlow{reg_sign} 816 cable grout (67.67 wt. %), Grade 100 ground granulated blast furnace slag (7.52 wt. %) and water (24.81 wt. %); (2) Identify equipment grout placement and performance properties; (3) Design up to 2 additional grout systems for filling the Tank 18-F and Tank 19-F equipment; (4) Prepare samples of candidate grouts and measure fresh properties, thermal properties and cured properties; (5) Recommend a grout for the Tier 1A equipment fill mock up - ADMP 4 foot high mock up, 1 inch and 2 inch pipes; (6) Support procurement of materials for the Tier 1A equipment fill mock up test; (7) Prepare samples of the recommended grout for hydraulic property measurements which can be used for comparison to values used in the F- Tank Farm Performance Assessment (PA); and (8) Document equipment fill grout data and recommendations in a report.

Stefanko, D.; Langton, C.

2011-12-15T23:59:59.000Z

479

TANK 18 AND 19-F TIER 1A EQUIPMENT FILL MOCK UP TEST SUMMARY  

SciTech Connect (OSTI)

The United States Department of Energy (US DOE) has determined that Tanks 18-F and 19-F have met the F-Tank Farm (FTF) General Closure Plan Requirements and are ready to be permanently closed. The high-level waste (HLW) tanks have been isolated from FTF facilities. To complete operational closure they will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) discouraging future intrusion, and (4) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. Bulk waste removal and heel removal equipment remain in Tanks 18-F and 19-F. This equipment includes the Advance Design Mixer Pump (ADMP), transfer pumps, transfer jets, standard slurry mixer pumps, equipment-support masts, sampling masts, dip tube assemblies and robotic crawlers. The present Tank 18 and 19-F closure strategy is to grout the equipment in place and eliminate vertical pathways by filling voids in the equipment to vertical fast pathways and water infiltration. The mock-up tests described in this report were intended to address placement issues identified for grouting the equipment that will be left in Tank 18-F and Tank 19-F. The Tank 18-F and 19-F closure strategy document states that one of the Performance Assessment (PA) requirements for a closed tank is that equipment remaining in the tank be filled to the extent practical and that vertical flow paths 1 inch and larger be grouted. The specific objectives of the Tier 1A equipment grout mock-up testing include: (1) Identifying the most limiting equipment configurations with respect to internal void space filling; (2) Specifying and constructing initial test geometries and forms that represent scaled boundary conditions; (3) Identifying a target grout rheology for evaluation in the scaled mock-up configurations; (4) Scaling-up production of a grout mix with the target rheology (16 second flow cone value) from 0.25 cubic feet to 4.3 cubic feet. (Ten 0.43 cubic batches were produced because full-scale equipment was not available for the Tier 1A test.); (5) Demonstrating continuous gravity filling of the ADMP mock up test form; (6) Demonstrating continuous gravity filling of 1 inch and 2 inch schedule 40 pipe; and (7) Demonstrating filling of 1 inch and 2 inch schedule 40 pipe from the bottom up by discharging through a tube inserted into the pipes. The Tier 1A mock-up test focused on the ADMP and pipes at least one inch in diameter. The ADMP which is located in center riser of Tank 18-F is a concern because the column for this long-shaft (55 ft) pump is unique and modification to the pump prior to placing it in service limited the flow path options for filling by creating a single flow path for filling and venting the ADMP support column. The large size, vertical orientation, and complicated flow path in the ADMP warrants a detailed description of this piece of ancillary equipment.

Stefanko, D.; Langton, C.

2011-11-04T23:59:59.000Z

480

Cleanroom Equipment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User Group and Userof aChristina MartosLibraryClaytonCleanCleanDoug DOE

Note: This page contains sample records for the topic "medical equipment non-energy" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Aeroservoelastic Stability of a 2D Airfoil Section equipped with a  

E-Print Network [OSTI]

reduction of the fatigue loads encountered by a wind turbine blade can be achieved using a deformable Airfoil Section equipped with a Trailing Edge Flap Department: Wind Energy Division Ris-R-1663(EN . . . . . . . . . . . . . . . . . . . . . . . . . 17 2.2.3 Pitching Moment . . . . . . . . . . . . . . . . . . . . . 18 2.2.4 Unsteady wake effects

482

Powerline Communication System for Monitoring and Supervision of Feeder Equipments for MV Substation Automation  

E-Print Network [OSTI]

to integrated volt/var control in order to optimize the management of capital assets and enhance operation With the deregulation of power market and for providing better services to electric consumers, the current substation primary equipments which are outsider substations such as MV/LV transformer and switchgears. For those

Paris-Sud XI, Universit de

483

Engineering Service Products: The Case of Mass-Customizing Service Agreements for Heavy Equipment  

E-Print Network [OSTI]

Engineering Service Products: The Case of Mass- Customizing Service Agreements for Heavy Equipment develop a reference model of service agreement engineering to help mass-customize and evaluate service. The Problem of Engineering Service Products for Manufacturers Manufacturers of heavy industry are increasingly

Hsu, Cheng

484

A high speed, fibre optic, link for digital equipment corporation VAXES  

SciTech Connect (OSTI)

This paper describes a fibre optic link that has been constructed which, used in conjunction with the CERN Host Interface family, connects high performance Digital Equipment Corporation (DEC) VAXes to VMEbus or FASTBUS over distances up to 1000 meters. The modular construction allows other permutations, including VAX/VAX, FASTBUS/FASTBUS, VMEbus/VMEbus, or FASTBUS/VMEbus connections, over similar distances.

McLaren, R.A.; Gallno, P.; Hollingworth, K. (CERN, 1211 Geneva 23 (CH)); Almeida, T.; Astor, C.; Gomes, P. (Laboratorio de Instrumentacao e Fisica Experimental de Particulas, Av. Elias Garcia 14-1 1000 Lisbon (PT)); Castro, J.; Moreira, P. (Instituto de Engenharia de Sistomas e Computadores, Rue Jose Falcao 15-6, 4000 Porto (PT))

1989-10-01T23:59:59.000Z

485

Manufacturing Equipment Modeling For a linear axis actuated by an electric motor complete the following  

E-Print Network [OSTI]

Manufacturing Equipment Modeling QUESTION 1 For a linear axis actuated by an electric motor(t). Include the axis disturbance force, but do not include motor electrical dynamics or Coulomb friction For a spindle actuated by an electric motor complete the following: a. Derive a differential equation

Landers, Robert G.

486

A pilot study of children's exposure to CCA-treated wood from playground equipment  

E-Print Network [OSTI]

A pilot study of children's exposure to CCA-treated wood from playground equipment S.L. Shalat Arsenic from chromated copper arsenate (CCA)-treated wood, widely used in playgrounds and other outdoor associated with children playing on CCA- treated playgrounds. In a Pilot Study, 11 children (13­71 months

Florida, University of

487

A pilot study of children's exposure to CCA-treated wood from playground equipment  

E-Print Network [OSTI]

A pilot study of children's exposure to CCA-treated wood from playground equipment S.L. Shalat online 17 February 2006 Abstract Arsenic from chromated copper arsenate (CCA)-treated wood, widely used possible health risks associated with children playing on CCA- treated playgrounds. In a Pilot Study, 11

Florida, University of

488

U.S. Playground Equipment Manufacturer and Purchaser Perceptions of Treated Wood  

E-Print Network [OSTI]

U.S. Playground Equipment Manufacturer and Purchaser Perceptions of Treated Wood Todd F. Shupe treated wood might cut life short for our children. "EPA chops down potential killer", 24 Hour News 8, Florida, after his bill to ban arsenic-treated wood from Florida's public playgrounds failed to pass

489

Air Quality: Monthly Hazardous Material Use, Fuel Consumption, and Equipment Operation Forms  

E-Print Network [OSTI]

Air Quality: Monthly Hazardous Material Use, Fuel Consumption, and Equipment Operation Forms Department: Chemical and General Safety Program: Air Quality Owner: Program Manager Authority: ES&H Manual, Chapter 30, Air Quality1 The conditions of SLAC's air quality permits specify that all subject hazardous

Wechsler, Risa H.

490

Effectiveness of cabs for dust and silica control on mobile mining equipment  

SciTech Connect (OSTI)

The Mine Safety and Health Administration (MSHA) has conducted a study to evaluate the effectiveness of cabs for controlling silica dust exposure during operation of mobile mining equipment. This study focused on bulldozers, front-end loaders and haul trucks, was conducted at surface coal mining operations and underground metal and nonmetal mining operations. Each piece of equipment tested was equipped with a cab. The vehicles sampled were from a range of manufacturers having different types of filter media and air intake configurations. The purpose of this study was to determine the reduction of dust and silica exposure that could be achieved through the use of a well-maintained cab. For each piece of equipment, dust and silica concentrations inside and outside the cab were determined and compared. In some cases, filtration efficiencies could be calculated. A properly designed environmental cab is sealed, has an intake air filtration system, and a heating and cooling system. Cabs should have good seals around the doors and windows. Factors such as cab pressurization filtration systems, filter media, and maintenance practices were also examined. In some cases, dust and silica reduction of 90 to 95% were observed.

Garcia, J.J.; Gresh, R.E.; Gareis, M.B.; Haney, R.A.

1999-07-01T23:59:59.000Z

491

DOE Fire Protection Handbook, Volume II. Fire effects and electrical and electronic equipment  

SciTech Connect (OSTI)

Electrical and electronic equipment, including computers, are used at critical facilities throughout the Department of Energy (DOE). Hughes Associates, Inc. was tasked to evaluate the potential thermal and nonthermal effects of a fire on the electrical and electronic equipment and methods to analyze, evaluate, and assist in controlling the potential effects. This report is a result of a literature review and analysis on the effects of fire on electrical equipment. It is directed at three objectives: (1) Provide a state-of-the-art review and analysis of thermal and nonthermal damage to electrical and electronic equipment; (2) Develop a procedure for estimating thermal and nonthermal damage considerations using current knowledge; and (3) Develop an R&D/T&E program to fill gaps in the current knowledge needed to further perfect the procedure. The literature review was performed utilizing existing electronic databases. Sources searched included scientific and engineering databases including Dialog, NTIS, SciSearch and NIST BFRL literature. Incorporated in the analysis is unpublished literature and conversations with members of the ASTM E-5.21, Smoke Corrosivity, and researchers in the electronics field. This report does not consider the effects of fire suppression systems or efforts. Further analysis of the potential impact is required in the future.

NONE

1994-08-18T23:59:59.000Z

492

Standardization of Chemical Protective Equipment for Protective Forces and Special Agents  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Notice provides requirements for the standardization and procurement of chemical protective equipment for use by Department of Energy (DOE) protective forces and Special Agents of the Transportation Safeguards Division (TSD). DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01. Does not cancel other directives.

2000-03-29T23:59:59.000Z

493

Demo: Organic Solar Cell-equipped Energy Harvesting Active Networked Tag (EnHANT) Prototypes  

E-Print Network [OSTI]

Demo: Organic Solar Cell-equipped Energy Harvesting Active Networked Tag (EnHANT) Prototypes Gerald harvesting and communications hardware, namely organic solar cells and ultra-wide-band impulse radio (UWB their communications and networking parameters to the available environmental energy harvested by the organic solar

Carloni, Luca

494

Distribution Effectiveness and Impacts on Equipment Sizing for Residential Thermal Distribution Systems  

E-Print Network [OSTI]

1 LBNL-43724 Distribution Effectiveness and Impacts on Equipment Sizing for Residential Thermal Distribution Systems Walker, I., Sherman, M., and Siegel, J. Environmental Energy Technologies Division Energy .................................................................................................................. 14 Figure 1. Simulations of Pulldowns from 3:00 p.m. on a Sacramento Design Day

495

Final Technical Report for project entitled "Equipment Request for the Belleville Agricultural Research and Education Center"  

SciTech Connect (OSTI)

Executive Summary The funding provided by the DOE for this project was used exclusively to purchase research equipment involved with the field development and evaluation of crop production technologies and practices for energy crop production. The new equipment has been placed into service on the SIU farms and has significantly enhanced our research capacity and scope for agronomy and precision ag research to support novel seed traits or crop management strategies for improving the efficiency and productivity of corn and soybeans. More specifically, the precision ag capability of the equipment that was purchased has heightened interest by faculty and associated industry partners to develop collaborative projects. In addition, this equipment has provided SIU with a foundation to be more successful at securing competitive grants in energy crop production and precision ag data management. Furthermore, the enhanced capacity for agronomy research in the southern Illinois region has been realized and will benefit crop producers in this region by learning to improve their operations from our research outcomes.

Young, Bryan; Nehring, Jarrett; Susan Graham, Brian Klubek

2013-01-16T23:59:59.000Z

496

Equipping Software Engineering Apprentices with a Repertoire of Practices Vincent Ribaud, Philippe Saliou  

E-Print Network [OSTI]

Equipping Software Engineering Apprentices with a Repertoire of Practices Vincent Ribaud, Philippe of the repertoire. A case study of a 6- apprentice team illustrates the observatory use and the reconstruction of apprentices' activity. Primary conclusions are that self-observation and self-analysis of a software engineer

Paris-Sud XI, Université de

497

Optimal Operation of a Wind Farm equipped with a Storage Unit  

E-Print Network [OSTI]

into another form of energy (kinetic energy or compressed air for example) and vice versa. This method has been is that the using cost of the storage device is not always a linear function of the energy stored or deliveredOptimal Operation of a Wind Farm equipped with a Storage Unit Paul Charton June 14, 2013 Keywords

Paris-Sud XI, Université de

498

DECISION ANALYSIS SCIENCE MODELING FOR APPLICATION AND FIELDING SELECTION APPLIED TO EQUIPMENT DISMANTLEMENT TECHNOLOGIES  

SciTech Connect (OSTI)

The dismantlement of radioactively contaminated process equipment is a major concern during the D&D process. There are an estimated 1,200 buildings in the DOE-EM complex that will require the dismantlement of equipment and various metal structures. As buildings undergo the D&D process, this metallic equipment contaminated with radionuclides such as uranium and plutonium must be size-reduced before final disposal. A single information source comparing dismantlement technologies in the areas of safety, cost, and performance is needed by DOE managers and is not currently available. The selection of the appropriate technologies to meet the dismantlement objectives for a given site is a difficult process in the absence of comprehensive and comparable data. Choosing the wrong technology could result in increased exposure of personnel to contaminants and an increase in D&D project costs. The purpose of this investigation was to evaluate commercially available and innovative technologies for equipment dismantlement and provide a comprehensive source of information to the D&D community in the areas of technology performance, cost, and health and safety.

M.A. Ebadian, Ph.D.

1999-01-01T23:59:59.000Z

499

Electrical axes of TESLA-type cavities (Theoretical background, development of measurement equipment, measurement results)  

E-Print Network [OSTI]

- 1 - Electrical axes of TESLA-type cavities (Theoretical background, development of measurement equipment, measurement results) Anton Labanc, MHF-SL, DESY, January 2008 Abstract Cells in TESLA cavities. A short overview was already published at the TESLA Report 2007-01. This paper brings more details about

500

Costs and indices for domestic oil and gas field equipment and production operations 1994 through 1997  

SciTech Connect (OSTI)

This report presents estimated costs and cost indices for domestic oil and natural gas field equipment and production operations for 1994, 1995, 1996, and 1997. The costs of all equipment and services are those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of the total number of oil wells to the total number of gas wells. The detail provided in this report is unavailable elsewhere. The body of this report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (compliance costs and lease availability) have a significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas equipment and production operations.

NONE

1998-03-01T23:59:59.000Z