Powered by Deep Web Technologies
Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Monitoring and Evaluation of Smolt Migration in the Columbia Basin, Volume XIV; Evaluation of 2006 Prediction of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead at Rock Island, Lower Granite, McNary, John Day and Bonneville Dams using Program Real Time, Technical Report 2006.  

SciTech Connect

Program RealTime provided monitoring and forecasting of the 2006 inseason outmigrations via the internet for 32 PIT-tagged stocks of wild ESU chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville Dams. Twenty-four stocks are of wild yearling chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2006, and have at least one year's historical migration data previous to the 2006 migration. These stocks originate in drainages of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through the tag identification and monitored at Lower Granite Dam. In addition, seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling chinook salmon and the steelhead trout runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling chinook, coho, and sockeye salmon, and steelhead trout forecasted to Rock Island, McNary, John Day, and Bonneville Dams.

Griswold, Jim

2007-01-01T23:59:59.000Z

2

Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XV : Evaluation of the 2007 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime.  

SciTech Connect

Program RealTime provided monitoring and forecasting of the 2007 inseason outmigrations via the internet for 26 PIT-tagged stocks of wild ESU Chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, one PIT-tagged wild stock of sockeye salmon to McNary Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville dams. Nineteen stocks are of wild yearling Chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2007 and have at least one year's historical migration data previous to the 2007 migration. These stocks originate in 19 tributaries of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through tag identification and monitored at Lower Granite Dam. Seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling Chinook salmon and the steelhead runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling Chinook, coho, and sockeye salmon, and steelhead forecasted to Rock Island, McNary, John Day, and Bonneville dams.

Griswold, Jim; Townsend, Richard L.; Skalski, John R.

2008-12-01T23:59:59.000Z

3

2014 Transmission Reliability Program Peer Review- Day 1 Presentations  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability Program Peer Review included 6 sessions over 2 days on June 3 - 4. Presentations from Day 1 (Sessions I through IV) are available here.

4

2014 Transmission Reliability Program Peer Review- Day 2 Presentations  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability Program Peer Review included 6 sessions over 2 days on June 3 - 4, 2014. Presentations from Day 2 (Sessions V and VI) are available here.

5

2013 Transmission Reliability Program Peer Review - Day 2 Presentations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Presentations 2013 Transmission Reliability Program Peer Review - Day 2 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 2 (Sessions V and VI) are available below. Session V: Ken Martin (EPG), Jim Thorp (Virginia Tech), Scott Ghiocel (RPI), Mani Venkatasubramanian (WSU) Session VI: Pete Sauer (U Illinois), Carlos Martinez (ASR), Gil Tam (EPG) 2013 TR Review - Data Validation & Conditioning - Ken Martin, EPG 2013 TR Review - Synchrophasor Data Conditioning and Validation - Jim Thorp, Virginia Tech 2013 TR Review - PMU-based Voltage Stability - Scott Ghiocel, Rensselaer Polytechnic Institute 2013 TR Review - Oscillation Monitoring System - Mani Venkatasubramanian,

6

2013 Transmission Reliability Program Peer Review - Day 2 Presentations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Presentations 2013 Transmission Reliability Program Peer Review - Day 2 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 2 (Sessions V and VI) are available below. Session V: Ken Martin (EPG), Jim Thorp (Virginia Tech), Scott Ghiocel (RPI), Mani Venkatasubramanian (WSU) Session VI: Pete Sauer (U Illinois), Carlos Martinez (ASR), Gil Tam (EPG) 2013 TR Review - Data Validation & Conditioning - Ken Martin, EPG 2013 TR Review - Synchrophasor Data Conditioning and Validation - Jim Thorp, Virginia Tech 2013 TR Review - PMU-based Voltage Stability - Scott Ghiocel, Rensselaer Polytechnic Institute 2013 TR Review - Oscillation Monitoring System - Mani Venkatasubramanian,

7

2013 Transmission Reliability Program Peer Review - Day 1 Presentations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Presentations 2013 Transmission Reliability Program Peer Review - Day 1 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Bharat Bhargava (EPG), Brett Amidan (PNNL), Ken Martin (EPG) Session II: Mark Buckner (ORNL) Session III: Dan Trudnowski (U Montana), Ning Zhou (PNNL) Session IV: Frank Tuffner (PNNL), Bernie Lesieutre (U Wisconsin), Harold Kirkham (PNNL), YC Zhang (NREL) 2013 TR Review - Eastern Interconnection Phase Angle Base Lining Study - Bharat Bhargava, EPG 2013 TR Review - Baselining Studies and Analysis - Brett Amidan, PNNL 2013 TR Review - Synchrophasor Standards Development and Support - Ken Martin, EPG

8

2013 Transmission Reliability Program Peer Review - Day 1 Presentations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Presentations 2013 Transmission Reliability Program Peer Review - Day 1 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Bharat Bhargava (EPG), Brett Amidan (PNNL), Ken Martin (EPG) Session II: Mark Buckner (ORNL) Session III: Dan Trudnowski (U Montana), Ning Zhou (PNNL) Session IV: Frank Tuffner (PNNL), Bernie Lesieutre (U Wisconsin), Harold Kirkham (PNNL), YC Zhang (NREL) 2013 TR Review - Eastern Interconnection Phase Angle Base Lining Study - Bharat Bhargava, EPG 2013 TR Review - Baselining Studies and Analysis - Brett Amidan, PNNL 2013 TR Review - Synchrophasor Standards Development and Support - Ken Martin, EPG

9

BPA Transmission, factsheet, McNary-John Day, October 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

the Columbia River into Oregon at the John Day Dam and then terminates at BPA's John Day Substation in Sherman County. BPA proposed the project to address the increased need for...

10

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENT, FISH AND WILDLIFE August 30, 2002 In reply refer to: T To: People Interested in the McNary-John Day Transmission Line Project Bonneville Power Administration (Bonneville) has finalized the enclosed Environmental Impact Statement (EIS) for the McNary-John Day Transmission Line Project. In March, we sent you the draft EIS, asked for your comments and had three public meetings. The response was great; we received about 350 comments on the draft document. Thank you for taking the time to read the document and tell us your ideas. This letter briefly describes the final EIS, outlines our next steps and tells where to call if you have questions. The final EIS is abbreviated, consisting of an introduction to the document, changes to the draft

11

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

12

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

13

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

14

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

15

EIS-0332: McNary-John Day Transmission Line Project, OR  

Energy.gov (U.S. Department of Energy (DOE))

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

16

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

17

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

18

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

19

MONITORING AND EVALUATION OF SMOLT MIGRATION IN THE COLUMBIA BASIN  

E-Print Network (OSTI)

of Energy Bonneville Power Administration Environment, Fish and Wildlife P.O. Box 3621 Portland, OR 97208 Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime Prepared by: Richard Testing Framework for RPA Improvement as Stated in the 2000 Federal Columbia River Power System (FCRPS

Washington at Seattle, University of

20

MONITORING AND EVALUATION OF SMOLT MIGRATION IN THE COLUMBIA BASIN  

E-Print Network (OSTI)

of Energy Bonneville Power Administration Environment, Fish and Wildlife P.O. Box 3621 Portland, OR 97208 Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime Prepared by: Richard as Stated in the 2000 Federal Columbia River Power System (FCRPS) Biological Opinion. Technical Report

Washington at Seattle, University of

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

MONITORING AND EVALUATION OF SMOLT MIGRATION IN THE COLUMBIA BASIN  

E-Print Network (OSTI)

Power Administration Environment, Fish and Wildlife P.O. Box 3621 Portland, OR 97208-3621 Project Number Granite, McNary, John Day, and Bonneville Dams using Program RealTime Prepared by: Richard L. Townsend Avenue, Suite 1820 Seattle, Washington 98101-2509 Prepared for: U.S. Department of Energy Bonneville

Washington at Seattle, University of

22

White Day  

E-Print Network (OSTI)

but also to their male co-workers. Men have White Day a month later on March 14th. Created by a sweets manufacturer in 1980 to boost sales, White Day is more of a marketing ploy than a holiday. On White Day, you will see men scurrying about purchasing giri...

Hacker, Randi

2010-05-05T23:59:59.000Z

23

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

24

Columbus Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Columbus Day Columbus Day Nature Bulletin No. 651 Oct6ober 14, 1961 Forest Preserve District of Cook County John J. Duffy, President Roberts Mann, Conservation Editor David H. Thompson, Senior Naturalist COLUMBUS DAY October 12th, 1492, was a great turning point in history. On that day Christopher Columbus, with 87 men in three small sailing vessels, sighted the low hills of a little island in the West Indies which he named San Salvador. Although he made three more voyages across the Atlantic he never realized that, instead of a route to the Orient, he had discovered a whole New World. With favorable winds they had sailed westward from the Canary Islands for 33 days and nights without sighting land. As they ran before the wind day after day into unknown seas the crews began to grumble that they would starve before they could make their way back to Spain. On the 6th day a brilliant meteor was an ill omen to the superstitious sailors. To quiet their fears somewhat, Columbus kept two ship's logs: a private record of his own showing the true distances traveled, and a second one -- for the crew -- in which each day's run was reduced.

25

Graduation Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Graduation Day Tevatron Impact Symposium Keynote Lisa Randall Graduation * graduation * graj-oo-ey-shuhn * noun 1. an act of graduating; the state of being graduated. * 2....

26

Memorial Day  

Energy.gov (U.S. Department of Energy (DOE))

Three years after the Civil War ended, on May 5, 1868, the head of an organization of Union veterans, the Grand Army of the Republic (GAR), established Decoration Day as a time for the nation to decorate the graves of the war dead with flowers. Maj. Gen. John A. Logan declared that Decoration Day should be observed on May 30. It is believed that date was chosen because flowers would be in bloom all over the country.

27

Calendar Day  

U.S. Energy Information Administration (EIA) Indexed Site

CORPORATION / Refiner / Location CORPORATION / Refiner / Location Table 5. Refiners' Total Operable Atmospheric Crude Oil Distillation Capacity as of January 1, 2013 Calendar Day Barrels per CORPORATION / Refiner / Location Calendar Day Barrels per Companies with Capacity Over 100,000 bbl/cd .............................................................................................................................. VALERO ENERGY CORP 1,863,300 Valero Refining Co Texas LP .............................................................................................................................. Texas City, Texas 225,000 .............................................................................................................................. Corpus Christi, Texas 200,000 .............................................................................................................................. Houston, Texas

28

May Day  

NLE Websites -- All DOE Office Websites (Extended Search)

May Day May Day Nature Bulletin No. 715 April 27, 1963 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor MAY DAY You must wake and call me early, call me early, mother dear; For I'm to be Queen o' the May, mother, I'm to be Queen o' the May. (Tennyson. Sixty years and more ago, May Day was an occasion for festivities and fun in many country towns. At daybreak on the first day of the fifth month we youngsters went "a-maying". We brought back freshly picked wildflowers and put them in little baskets which we hung on the front door knobs of our favorite people. If you were secretly sweet on some winsome lass she got a special basket, maybe with a bow of ribbons on the handle. In those days wildflowers were abundant and we did not know that it is wrong to pick them -- that because of such picking, year after year, most of them would gradually disappear. There was also a Queen of the May, one of the loveliest girls in town; and a Maypole, twined with ribbons and with ropes of flowers, around which we danced and sang at the ends of colored streamers from its top.

29

Arbor Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Arbor Day Arbor Day Nature Bulletin No. 62 April 20, 1946 Forest Preserve District of Cook County Clayton F. Smith, President Roberts Mann, Superintendent of Conservation ARBOR DAY The oldest living thing on earth is a tree. Some of the giant sequoias in California are more than 3500 years old. One of them, fallen, was proven to be 3210 years old by a count of the annual growth rings. It grew from a tiny seed which sprouted about the time when Joseph, with the coat of many colors, was prime minister of Egypt and the known world was in the middle bronze age. The largest living thing on earth is a tree, the General Sherman, a giant sequoia in Giant Forest, Sequoia National Park. It has a base diameter of 30.7 feet, a diameter of 17 feet at 120 feet above the ground, and a height of 272 feet. Its first large branch, starting at 130 feet above the ground, is 6.8 feet in diameter and 150 feet long, itself larger than the largest of many other tree species, yet an inconspicuous part of this monster. The trunk of the General Sherman, exclusive of the limbs, contains about 50,000 cubic feet wood and probably 250,000 board feet of usable lumber could be obtained -- enough to build 15 five-room all- wood houses. Two other giant sequoias, the General Grant and the Boole, have base diameters of 33.3 and 33.2 feet respectively, but they are not as high and taper more rapidly.

30

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers (EERE)

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

31

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

32

Earth Day, Every Day | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Day, Every Day Earth Day, Every Day Earth Day, Every Day April 20, 2011 - 5:09pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs April 22, 2011 is the 41st celebration of Earth Day, a day set aside to inspire awareness and appreciation for the Earth's natural environment. The first Earth Day focused on the United States, but has grown over the years and is now celebrated in more than 175 countries every year. To help celebrate, the Department of Energy is holding Earth Week festivities at our headquarters here in Washington, D.C. throughout this week. This year's theme is "Earth Day, Every Day! Changing Behavior to Reduce DOE's Carbon Footprint." Part of the celebration will include an outdoor Community Day celebration

33

2014 Reliability & Markets Peer Review- Day 1 Presentations  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 5 - 6, 2014. Presentations from Day 1 (Sessions I through IV) are available here.

34

Earth Day Haiku  

Science Journals Connector (OSTI)

Earth Day Haiku ... The winning entries in the 2003 Chemists Celebrate Earth Day poetry contest (sponsored by ACS) are presented. ...

2004-02-01T23:59:59.000Z

35

GIS Day(s) Palooza Extravaganza 2013  

E-Print Network (OSTI)

A summary of the Texas A & M University GIS Day 2013 outreach and instruction events, presented to TAMU Libraries staff....

Weimer, Kathy

2014-10-22T23:59:59.000Z

36

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

37

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

38

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network (OSTI)

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

39

2014 Transmission Reliability Program Peer Review  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is available to download.

40

Regulatory Roadmap Workshop for Federal Bulk Transmission Regulations...  

Open Energy Info (EERE)

Regulatory Roadmapping Pgower's picture Submitted by Pgower(45) Member 7 August, 2014 - 13:19 One-day workshop to review regulatory roadmaps for bulk transmission. Date:...

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

42

E-Science Day  

E-Print Network (OSTI)

on December 6, 2011, E-Science Day was a day-long event,regional librarians in e-science, and to expose regionalthe initiation of e-science support projects within their

Abad, Raquel

2012-01-01T23:59:59.000Z

43

Argonne's Earth Day 2011  

ScienceCinema (OSTI)

Argonne celebrated Earth Day on April 21, 2011 with an event that featured green activities and information booths.

None

2013-04-19T23:59:59.000Z

44

Earth Day Plus 40  

Science Journals Connector (OSTI)

Earth Day Plus 40 ... Many of our readers were not even born at the time of the first Earth Day, April 22, 1970. ... The first Earth Day was the brainchild of Wisconsin Senator Gaylord Nelson, who suggested the idea of a national teach-in. ...

Jerald L. Schnoor

2010-03-10T23:59:59.000Z

45

What if Every Day was Earth Day? | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

What if Every Day was Earth Day? What if Every Day was Earth Day? April 22, 2014 - 9:51am Addthis Celebrate Earth Day every day this year. | Photo courtesy of iStockphoto.com...

46

Earth Day Redux  

Science Journals Connector (OSTI)

Earth Day Redux ... Thirty years ago this month, as a young reporter at Chemical & Engineering News , I was assigned to write the lead News of the Week story on the very first Earth DayApril 22,1970. ... Here's the lead of that 1970 C&EN story: "Millions of people were expected to participate in protests against their polluted heritage as the much heralded and politically popular environmental movement picked up steam last week and culminated Wednesday in Earth Day. ...

MADELEINE JACOBS

2000-04-24T23:59:59.000Z

47

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

48

Lab celebrates Earth Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab celebrates Earth Day Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: Dec. 2014 - Jan. 2015 All Issues submit Lab...

49

National Day of Remembrance  

SciTech Connect

Ames Laboratory observed the National Day of Remembrance for weapons workers from the Cold War era with a ceremony held Oct. 27, 2009 at the Ames Public Library.

None

2010-01-01T23:59:59.000Z

50

National Day of Remembrance  

ScienceCinema (OSTI)

Ames Laboratory observed the National Day of Remembrance for weapons workers from the Cold War era with a ceremony held Oct. 27, 2009 at the Ames Public Library.

None

2013-03-01T23:59:59.000Z

51

Postdoc Research Day  

NLE Websites -- All DOE Office Websites (Extended Search)

opportunities for growth. Contact Email Present research, receive feedback, enhance collaboration and technical discussions Los Alamos Postdoc Research Day (LAPRD) is a Lab-wide...

52

Transmission Business Unit Manager  

Energy.gov (U.S. Department of Energy (DOE))

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

53

In-roads to the spread of antibiotic resistance: regional patterns of microbial transmission in northern coastal Ecuador  

Science Journals Connector (OSTI)

...selection pressures, routes of transmission and the invasion of...selection pressure and routes of transmission appears to be a new...person per day. The transmission rate of the remote...Circles with solid line, rho = 0.001...

2012-01-01T23:59:59.000Z

54

PARTI: Your First Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Your First Day Your First Day Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Calendar Weekly Activities Meetings Program Requirements Links FAQ Checkout Schedule: Day Time Event Location Monday after Arrival 7:45 AM Meet Margie. Wilson Hall by front doors 8:00-11:30 AM Orientation To be announced 11:30 AM - 1:00 PM Lunch Cafeteria 1:00 PM Safety Training To be announced 4:30 PM Meet with Mentor. Wilson Hall, 2nd Floor Crossover Forms: Please print out and complete the following forms and bring them to orientation. Please check with your program contact if you have questions. We will help you fill them out when you come if you need assistance. For the Student Health Questionaire, you will need to show proof that you have health insurance. Name and Address System Form

55

Sci-Ed Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Sci-Ed Day Sci-Ed Day a teacher professional development day at Brookhaven National Laboratory On Tuesday, November 5 th , 2013, the Portal to Discovery, a partnership between the Office of Educational Programs at Brookhaven National Laboratory (BNL) and the Long Island Matrix of Science and Technology (LIMSAT) is hosting the 2 nd annual Sci-Ed Day. This is an opportunity for all science educators to participate in a variety of workshops created for professional development. Elementary teachers, through a series of hands-on activities, will explore static electricity and the atom, learn to differentiate those activities, and make valuable connections to their math and ELA curriculum. They will tour a laboratory facility and have the opportunity to speak with

56

National Day of Remembrance  

Energy.gov (U.S. Department of Energy (DOE))

On July 9, 2014, the U.S. Senate announced the passage of S. Res. 417, a Senate resolution designating October 30, 2014, as a National Day of Remembrance (NDR) for Nuclear Weapons Program Workers.

57

National Bioenergy Day 2014  

Energy.gov (U.S. Department of Energy (DOE))

Bioenergy, the use of agricultural waste and forestry byproducts to generate heat and energy, will be celebrated during the second annual National Bioenergy Day on October 22, 2014. This is an...

58

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

59

Lab celebrates Earth Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab celebrates Earth Day Lab celebrates Earth Day Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Lab celebrates Earth Day Multiple activities focus on environmental protection. May 1, 2013 A team from Industrial Hygiene and Safety during the Great Garbage Grab A team from Industrial Hygiene and Safety during the Great Garbage Grab. Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Great Garbage Grab From April 1 - 12 employees were encouraged to don work gloves and very attractive orange vests to pick up litter around their workplace-both on and off Lab property. This year's winner of the coveted Traveling Trash Trophy (for picking up the most litter) went to the Worker Safety and

60

Foundation Day Meeting  

E-Print Network (OSTI)

War occurred on National Foundation Day? Hard to say but it must have pleased Tangun who founded Korea 4,340 years ago. Tangun is believed to be the son of a god and a woman transformed from a bear and is said to have established his kingdom...

Hacker, Randi; Tsutsui, William; Haufler, Marsha

2007-11-28T23:59:59.000Z

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

62

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

63

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

64

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

65

Transmission Utilization Group (TUG)  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

66

Transmission Commercial Project Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

67

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

68

NUG 2013 Business Day  

NLE Websites -- All DOE Office Websites (Extended Search)

» » Business Day NUG 2013 Business Day NUG Business Meeting Agenda Tuesday, February 12, 2013 NERSC Oakland Scientific Facility 8:30 - Working Breakfast: Welcome and Introductions -- Stephane Ethier 9:00 - NERSC Accomplishments and Plans -- Francesca Verdier 9:30 - Department of Energy Update -- Dave Goodwin 9:45 - NERSC's New Building Update -- Brent Draney 10:00 - Edison Update -- Richard Gerber, Tina DeClerck, Zhengji Zhao 10:30 - Break 10:45 - The NERSC 8 Procurement -- Katie Antypas 11:15 - NERSC Initiative: Preparing Applications for Exascale, Nick Wright 11:45 - NERSC Parallel Database Evaluation - Yushu Yao 12:00 - Working Lunch: The role of NUGEX; Announcement of NUGEX election results; General discussion - Stephane Ethier & Frank Tsung 13:30 - Requirements Reviews Update - Richard Gerber & Harvey Wasserman

69

2013 Reliability & Markets Peer Review - Day 1 Presentations | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013 Reliability & Markets Peer Review - Day 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom Overbye (U Illinois) Session IV: Lindsay Anderson (Cornell), HyungSeon Oh (Cornell) 2013 R&M Peer Review - Assessing Transmission Investments Under Uncertainty - Ben Hobbs, Johns Hopkins 2013 R&M Peer Review - Coordinated Aggregation of Distributed Energy

70

Vice President, Transmission Marketing & Sales  

Energy.gov (U.S. Department of Energy (DOE))

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

71

Designation of National Interest Electric Transmission Bottlenecks (NIETB)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Comments Summary of Comments Designation of National Interest Electric Transmission Bottlenecks (NIETB) Summary of Comments The US Department of Energy (DOE) issued a Federal Register Notice of Inquiry [FR doc. 04-16724] on July 22, 2004, which solicited comments related to the Designation of National Interest Transmission Bottlenecks (NIETB). The 60-day comment period ended on September 21, 2004. Forty-seven comments were received in response to the Notice of Inquiry. Designation of National Interest Electric Transmission Bottlenecks (NIETB) Summary of Comments More Documents & Publications Comments to the Designation of National Interest Transmission Bottlenecks (NIETB) Notice of Inquiry Designation of National Interest Electric Transmission Bottlenecks (NIETB)

72

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

73

Celebrate Earth Day with ACS  

Science Journals Connector (OSTI)

Celebrate Earth Day with ACS ... Winners of the ACS-sponsored Earth Day 2004 music video contest are reported. ... ACS resources for celebrating the Earth Day 2005 theme, "AirHere, There, Everywhere", are discussed. ...

Erica K. Jacobsen

2005-03-01T23:59:59.000Z

74

Proceedings, Dean's Day 1999  

SciTech Connect

On January 14--15, 1999, Sandia National Laboratories sponsored Deans Day, a conference for the Deans of Engineering and other executive-level representatives from 29 invited universities. Through breakout sessions and a wrap-up discussion, university and Sandia participants identified activities to further develop their strategic relationships. The four primary activities are: (A) concentrate joint efforts on current and future research strengths and needs; (B) attract the best students (at all grade levels) to science and engineering; (C) promote awareness of the need for and work together to influence a national science and technology R and D policy; and (D) enable the universities and Sandia to be true allies, jointly pursuing research opportunities and funding from government agencies and industry.

Zanner, M.A.

1999-03-01T23:59:59.000Z

75

Heating Degree Days  

U.S. Energy Information Administration (EIA) Indexed Site

Heating Degree Days Heating Degree Days New England ................ 2,626 737 115 2,062 3,105 849 159 2,247 3,184 872 136 2,180 5,541 6,359 6,373 Middle Atlantic .............. 2,326 576 85 1,899 2,906 672 123 2,041 2,924 682 90 1,986 4,886 5,742 5,682 E. N. Central ................. 2,440 621 139 2,150 3,279 772 119 2,343 3,141 726 129 2,230 5,350 6,514 6,227 W. N. Central ................ 2,515 520 143 2,360 3,424 908 103 2,541 3,216 677 152 2,404 5,539 6,976 6,450 South Atlantic ............... 1,129 168 16 992 1,513 217 21 1,059 1,466 202 16 1,010 2,306 2,809 2,695 E. S. Central ................. 1,361 180 28 1,326 1,939 289 16 1,430 1,839 245 23 1,336 2,896 3,675 3,443 W. S. Central ................ 913 38 3 729 1,189 141 2 909 1,150 83 5 821 1,682 2,239 2,060 Mountain ....................... 2,063 542 98 1,741 2,430 689 101 1,885 2,189 642 130 1,817 4,444

76

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

77

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

78

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

79

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

80

Transmission Line Security Monitor  

SciTech Connect

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

82

Earth Day 2010: Earth Day 40th Anniversary Poster  

E-Print Network (OSTI)

EGJ Issue 30 Earth Day 2010 ISSN 1076-7975 In celebration of 40 Earth Day the Electronic GreenEconomics, Poznan, Poland. Earth image used from www.sxc.hu.

Nowacka, Izabela

2010-01-01T23:59:59.000Z

83

NUG 2014 Business Day Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Business Day Presentations NUG 2014 Business Day Presentations Sort by: Default | Name | Date (low-high) | Date (high-low) | Source | Category NERSC Update for NUG2014 February 6,...

84

EIS-0411: Transmission Agency of Northern California Transmission Project  

Energy.gov (U.S. Department of Energy (DOE))

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

85

Happy B-Earth Day  

Science Journals Connector (OSTI)

Happy B-Earth Day ... n April 22, 1970, the U.S. celebrated its first Earth Day. ... Internationally, the Vernal Equinox (often March 20) had been recognized for Earth Day starting in 1969, and the U.N. made official that recognition in 1971. ...

Darcy J. Gentleman

2010-03-30T23:59:59.000Z

86

Earth Day Illustrated Haiku Contest  

Science Journals Connector (OSTI)

Earth Day Illustrated Haiku Contest ... Chemists Celebrate Earth Day: "RecyclingChemistry Can! ... As part of their 2007 Chemists Celebrate Earth Day Celebration, the American Chemical Society is sponsoring an illustrated haiku contest for students in grades K12 around the theme, RecyclingChemistry Can! ...

JCE staff

2007-02-01T23:59:59.000Z

87

2013 Reliability & Markets Peer Review - Day 1 Presentations | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Presentations 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom Overbye (U Illinois) Session IV: Lindsay Anderson (Cornell), HyungSeon Oh (Cornell) 2013 R&M Peer Review - Assessing Transmission Investments Under Uncertainty - Ben Hobbs, Johns Hopkins 2013 R&M Peer Review - Coordinated Aggregation of Distributed Energy Resources - Kameshwar Poolla, UC Berkeley

88

Transmission Access Resources  

Energy.gov (U.S. Department of Energy (DOE))

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

89

Performance Incentives for Transmission  

E-Print Network (OSTI)

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

90

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

91

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

92

Transmission Grid Integration  

Energy.gov (U.S. Department of Energy (DOE))

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

93

Honda Transmission Technical Center  

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

94

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

95

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

96

National Electric Transmission Congestion Study Webinars | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

97

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

98

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

99

Hybrid Transmission Corridor study  

SciTech Connect

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

100

Midwest Numerical Analysis Day 2011  

E-Print Network (OSTI)

Group Photos: Link. The 2011 Midwest Numerical Analysis Day ... (Free parking across street during the weekend). The organizers are Jie Shen (Chair), Peijun...

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Neutrino Physics AAPT Strand Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Physics AAPT Strand Day NSTA Regional, 2005 Jocelyn Monroe, Columbia University 1. What Is a Neutrino Anyway? 2. The Question Of Neutrino Mass 3. Searching For Neutrino...

102

McNary-John Day  

NLE Websites -- All DOE Office Websites (Extended Search)

rights-of-way, then cross the Columbia River back into Oregon and end at BPA's John Day Substation. BPA prepared an environmental impact statement under the National...

103

Earth Day 2014 Photo Contest  

Office of Environmental Management (EM)

Earth Day 2014 Photo Contest CALLING ALL PHOTOGRAPHERS Professionals, amateurs, and the camera sharp shooter We invite all DOE employees and DOE contractors to share images of...

104

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

105

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

106

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

107

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

108

Transmission line capital costs  

SciTech Connect

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

109

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

110

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

111

Third Annual Medical Education Day  

E-Print Network (OSTI)

Fellowships 16 Branstad Distinguished Educator 17 Medical Education Posters #12;5 Related Center Faculty1 Third Annual Medical Education Day February 1, 2013 Center for Education in Medicine Northwestern University Feinberg School of Medicine #12;Third Annual Medical Education Day at Northwestern University

Engman, David M.

112

2013 Transmission Reliability Program Peer Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Reliability Program Peer Review Transmission Reliability Program Peer Review 2013 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations are available through the individual session links. The agenda and introduction by Joe Eto, LBNL, are available below. Day 1: June 27 Session I Baselining Studies and Analysis, Bharat Bhargava, EPG Baselining Studies and Analysis, Brett Amidan, PNNL Synchrophasor Standards Support and Development, Ken Martin, EPG Session II Advanced Synchrophasor Metrology, Stan Hadley, ORNL GPS Issue Management, Mark Buckner, ORNL Technology Assessment for Next Generation PMU, Mark Buckner, ORNL Session III Measurement-Based Stability Assessment, Dan Trudnowski, U. Montana

113

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

114

Continuously variable transmission  

SciTech Connect

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

115

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

116

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

117

The History of Arbor Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Arbor Day Arbor Day Nature Bulletin No. 227-A April 23, 1966 Forest Preserve District of Cook County Seymour Simon, President Roland F. Eisenbeis, Supt. of Conservation THE HISTORY OF ARBOR DAY Most holidays remind us of past events, but Arbor Day, set aside for the planting of trees, looks toward the future. That is truly conservation. Conservation may be defined as the wise use of all our natural resources for the permanent good of all the people . It is a way of living that looks toward the future. The idea of Arbor Day started on January 4, 1872, when J. Sterling Morton, then a member of the Nebraska Board of Agriculture, introduced a resolution that: "Wednesday, the tenth day of April, 1872, be and the same is hereby especially set apart and consecrated for the planting of trees in the State of Nebraska and the State Board of Agriculture hereby name it Arbor Day; and to urge upon the people of the State the vital importance of tree planting .... .

118

Butchering Day on the Farm  

NLE Websites -- All DOE Office Websites (Extended Search)

Butchering Day on the Farm Butchering Day on the Farm Nature Bulletin No. 734 November 30, 1963 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor BUTCHERING DAY ON THE FARM In the old days, on a farm, we seldom had much money but we had a lot of fun. At threshing time, for instance, horseplay and fun erupted amidst sweaty spells of hard work. Another big event in farm life when neighbors got together, worked hard and had fun, was butchering day. Most of us butchered at least twice during winter. The number of times and the number of hogs depended upon the size of each family. We ate pork three times a day, six days a week, and chicken on Sunday. Beef steaks and roasts were rare treats enjoyed when we ate with friends or relatives in town. We had no refrigeration, no way to keep a side of beef; whereas hog meat could be smoked, "salted down", pickled, or preserved in big jars of lard.

119

How Do You Observe Earth Day Every Day? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Observe Earth Day Every Day? How Do You Observe Earth Day Every Day? April 23, 2009 - 1:44pm Addthis Yesterday was officially Earth Day, but really, every day should be Earth Day....

120

2012 Transmission and Energy Storage Peer Review Presentations Available |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Transmission and Energy Storage Peer Review Presentations 2 Transmission and Energy Storage Peer Review Presentations Available 2012 Transmission and Energy Storage Peer Review Presentations Available December 3, 2012 - 1:26pm Addthis Presentations from two peer reviews in September are now available. The Consortium for Electric Reliability Technology Solutions (CERTS) Transmission Reliability R&D Load as a Resource (LAAR) Program peer review included five presentations on September 20, 2012, hosted by DOE at the Lawrence Berkeley National Lab. DOE's Energy Storage Systems Program (ESS) conducted a peer review and update meeting in Washington, DC on September 26 - 28, 2012. The 3-day conference included nine sessions and two poster sessions. Addthis Related Articles 2013 Transmission Reliability R&D Peer Review Presentations Available

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Earth Day | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Day Earth Day Earth Day If you do not see the event begin at 3pm ET, please refresh your browser. Are you looking for ways to go green while saving yourself some green? Or are you interested in learning how to incorporate renewable energy options -- like solar, wind and geothermal -- into your home? This Earth Day, hang out with Energy Department experts to learn how you can reduce your energy use, improve your home's comfort and cut your energy bills. We hope you'll join us on April 22 at 3 pm ET for a Google+ Hangout on home energy efficiency tips and advice, and learn how you can submit your questions now. During the Hangout, we'll be sharing some of our Twitter followers' favorite energy-savings tips -- share yours now using #tipsEnergy. Panelists include:

122

Italian Students: Your First Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Your First Day Your First Day Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ Schedule: Day Time Event Location Monday after Arrival 7:45 AM Meet Tanja. Wilson Hall by front doors 8:00-11:30 AM Orientation To be announced 11:30 AM - 1:00 PM Lunch Cafeteria 1:00 PM Safety Training To be announced Forms: Please print out and complete the following forms and bring them to orientation. Please check with your program contact if you have questions. We will help you fill them out when you come if you need assistance. For the Student Health Questionaire, you will need to show proof that you have health insurance. Name and Address System Form Personal Data Form --> Personal Data Form Invention and Employee Patent Agreement

123

Lee Teng: Your First Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Your First Day Your First Day Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ Schedule: Day Time Event Location Monday after Arrival 7:45 AM Meet Tanja. Wilson Hall by front doors 8:00-11:30 AM Orientation To be announced 11:30 AM - 1:00 PM Lunch Cafeteria 1:00 PM Safety Training To be announced Forms: Please print out and complete the following forms and bring them to orientation. Please check with your program contact if you have questions. We will help you fill them out when you come if you need assistance. For the Student Health Questionaire, you will need to show proof that you have health insurance. Name and Address System Form Personal Data Form --> Personal Data Form Invention and Employee Patent Agreement

124

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

125

Idle Operating Total Stream Day  

U.S. Energy Information Administration (EIA) Indexed Site

3 3 Idle Operating Total Stream Day Barrels per Idle Operating Total Calendar Day Barrels per Atmospheric Crude Oil Distillation Capacity Idle Operating Total Operable Refineries Number of State and PAD District a b b 11 10 1 1,293,200 1,265,200 28,000 1,361,700 1,329,700 32,000 ............................................................................................................................................... PAD District I 1 1 0 182,200 182,200 0 190,200 190,200 0 ................................................................................................................................................................................................................................................................................................ Delaware......................................

126

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

127

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

128

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

129

Patterns of Transmission Investment  

E-Print Network (OSTI)

long term performance contracts with a developer of an HVDC transmission link to expand interconnection capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

130

Boardman to Hemingway Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

131

Transmission Line Circuit Alexander Glasser  

E-Print Network (OSTI)

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

132

A Night and Day Difference  

NLE Websites -- All DOE Office Websites (Extended Search)

11 11 PNNL-SA-80423 A Night-and-Day Difference "Grand Challenge" demonstrates team-based science approach; provides new systems-level understanding of microbes important for biofuels and carbon sequestration. In late 2004, when Dr. Himadri Pakrasi walked into the crowded EMSL Auditorium, he recognized only one scientist he knew. In the hours that followed, discussions circled around a single challenge: designing a multi- disciplinary, multi-institutional effort to understand the ways unique cyanobacteria harness energy from sunlight by day and generate their own fertilizer at night. The ultimate goal? To make discoveries that support engineering of such microbes for energy and environmental purposes. The day was the original scoping meeting

133

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

134

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

135

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

136

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

137

Property:DayQuantity | Open Energy Information  

Open Energy Info (EERE)

DayQuantity DayQuantity Jump to: navigation, search Property Name DayQuantity Property Type String Description Enter the number of days (the default), but convert it to whatever time metric you'd like. Please note that the conversion to months and years is not accurate since the conversion depends on the specific years and months, but which are not known. Acceptable units (and their conversions) are: 1 day,Day,days,Days,DAY,DAYS,d,D 24 hour,hours,Hour,Hours,hr,hrs,HOUR,HOURS,HR,HRS 1440 minute,minutes,Minute,Minutes,min,Min,MINUTE,MINUTES,MIN 86400 second,seconds,Second,Seconds,sec,Sec,SECOND,SECONDS,SEC 0.142857143 week,weeks,Week,Weeks,wk,Wk,WEEK,WEEKS,WK 0.032786885 month,months,Month,Months,MONTH,MONTHS 0.002739726 year,years,Year,Years,yr,Yr,YEAR,YEARS,YR 1 day,Day,days,Days,DAY,DAYS,d,D

138

Earth Day 2014 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Earth Day 2014 Earth Day 2014 Earth Day 2014 This year, we're celebrating Earth Day all week long. It's Earth Week on Energy.gov We're focusing on climate change, highlighting...

139

ONE DAY ON SHAPE OPTIMIZATION  

E-Print Network (OSTI)

ONE DAY ON SHAPE OPTIMIZATION Tuesday November 17, 2009 Aula Buzano - Dipartimento di Matematica to "Shape Optimization", a very active research field which combines techniques from several areas of mathematics to set out and solve problems where the optimal shape of an object has to be determined, in order

Ceragioli, Francesca

140

States Celebrate National Weatherization Day  

Energy.gov (U.S. Department of Energy (DOE))

States across the country celebrated National Weatherization Day October 30 with formal proclamations from governors and special events to recognize the importance of weatherization and the dedication of local weatherization service providers, state and local agencies, and researchers dedicated to improving the energy efficiency of American homes.

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

142

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

143

Jobs Day and Nuclear Risk Insurance Announcement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jobs Day and Nuclear Risk Insurance Announcement Jobs Day and Nuclear Risk Insurance Announcement Jobs Day and Nuclear Risk Insurance Announcement August 4, 2006 - 8:41am Addthis Prepared Remarks for Energy Secretary Bodman Thank you all for being here and thanks, Mike, for that very nice introduction and for the tour of your transmission control center. I also want to thank Southern Company and Georgia Power for arranging this event and I appreciate Lauren Walker from Governor Perdue's office and Derick Corbett from Congressman Linder's office joining us here today. During my tour I got a firsthand look at the fine job your operators are doing to keep the power flowing to some 2 million customers around the state of Georgia . . . despite the heat wave that has gripped your region and so much of the rest of the country-Washington included. You and the

144

Jobs Day and Nuclear Risk Insurance Announcement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jobs Day and Nuclear Risk Insurance Announcement Jobs Day and Nuclear Risk Insurance Announcement Jobs Day and Nuclear Risk Insurance Announcement August 4, 2006 - 8:41am Addthis Prepared Remarks for Energy Secretary Bodman Thank you all for being here and thanks, Mike, for that very nice introduction and for the tour of your transmission control center. I also want to thank Southern Company and Georgia Power for arranging this event and I appreciate Lauren Walker from Governor Perdue's office and Derick Corbett from Congressman Linder's office joining us here today. During my tour I got a firsthand look at the fine job your operators are doing to keep the power flowing to some 2 million customers around the state of Georgia . . . despite the heat wave that has gripped your region and so much of the rest of the country-Washington included. You and the

145

Absence of Patient-to-Patient Intrahospital Transmission of Staphylococcus aureus as Determined by Whole-Genome Sequencing  

Science Journals Connector (OSTI)

...infections. The lack of intrahospital transmission may reflect a fundamental difference between day-to-day transmission events in...no further review was performed on that pair. Next, the electronic medical records of both patients in the isolate pair were...

S. Wesley Long; Stephen B. Beres; Randall J. Olsen; James M. Musser

2014-10-01T23:59:59.000Z

146

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network (OSTI)

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

147

Argonne's 2012 Earth Day Event  

ScienceCinema (OSTI)

Argonne's 2012 Earth Day event drew crowds from across the laboratory. Argonne and U.S. Department of Energy employees toured booths and interactive displays set up by Argonne programs and clubs. Several of Argonne's partners participated, including U.S. Department of Energy, University of Chicago, Abri Credit Union, DuPage County Forest Preserve, DuPage Water Commission, PACE and Morton Arboretum. Argonne scientists and engineers also participated in a poster session, discussing their clean energy research.

None

2013-04-19T23:59:59.000Z

148

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

149

National Electric Transmission Congestion Study: Preliminary...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

150

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

151

Transmission/Permitting Atlas/State Data | Open Energy Information  

Open Energy Info (EERE)

Transmission/Permitting Atlas/State Data Transmission/Permitting Atlas/State Data < Transmission‎ | Permitting Atlas Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State State Siting Act State Preemptive Authority Siting/Permitting Entities Permit Processing Timeframe Arizona None If TLSC finds compliance with local land use unreasonable or unfeasible, then the TLSC may grant a certificate Arizona Corporation Commission (ACC); Transmission Line Siting Committee (TLSC) 210-240 Days California Public Utilities Code Section 1001 Local jurisdictions are preempted from regulating electric power line projects California Public Utilities Commission (CPUC) 18 months

152

Non-transposed, three phase transmission lines: a study of their effect on load voltages.  

E-Print Network (OSTI)

TRANSMISSION LINES A S'PJDY OF THEIR EFFECT ON LOAD VOLTAGES A Thesis By Robert Dean Chenoweth August 1951 NON-TRANSPOSED~ THREE PHASE TRANSMISSION LINES A STUDY OF THEIR EFFECT ON LOAD VOLTAGES A Thesis Submitted to the Faculty of the Agricultural... all large blocks of alternating current power are transmitted from the generating station to the load by means of three phase transmission lines. With present day equipment this method is economical and when ~ properly designed gives very...

Chenoweth, Robert Dean

2012-06-07T23:59:59.000Z

153

Dynamic Transmission Electron Microscopy  

SciTech Connect

Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

2012-10-12T23:59:59.000Z

154

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Energy.gov (U.S. Department of Energy (DOE))

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

155

Transmission Reliability | Department of Energy  

Energy Savers (EERE)

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

156

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

157

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

158

Planning for Earth Day | Department of Energy  

Energy Savers (EERE)

Planning for Earth Day Planning for Earth Day April 16, 2014 - 10:14am Addthis Earth Day is a great time to enjoy the outdoors and consider the environment. | Photo courtesy of...

159

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

160

Hydrogen Transmission and Distribution Workshop  

Energy.gov (U.S. Department of Energy (DOE))

Proceedings from the Hydrogen Transmission and Distribution Workshop held February 25-26, 2014, in Golden, Colorado. The objective was to discuss and share information on the research, development, and demonstration needs and challenges for low-cost, effective hydrogen transmission and distribution from centralized production facilities to the point of use.

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Direct current power transmission systems  

SciTech Connect

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

162

Earth Day event showcases LANL energy work  

NLE Websites -- All DOE Office Websites (Extended Search)

Earth Day showcases energy work Earth Day event showcases LANL energy work The public is invited to learn about projects in energy conservation, generation, research, and...

163

Joint Capability Technology Demonstration (JCTD) Industry Day...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Capability Technology Demonstration Industry Day Presentations Partnering with Utilities for Energy Efficiency & Security 2010 Smart Grid Peer Review Day Two Morning Presentations...

164

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

165

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

166

Regional Transmission Projects: Finding Solutions  

SciTech Connect

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

167

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions  

Energy.gov (U.S. Department of Energy (DOE))

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

168

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); analyze the potential within the district to utilize farm wastes to produce biofuels; enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; identify the policy, regulatory, and financial barriers impeding development of a new energy system; and improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the Colleges yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

169

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

170

Bibliography on transmission access issues  

SciTech Connect

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

171

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

172

Coordination of Transmission Line Transfer Capabilities  

E-Print Network (OSTI)

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

173

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

174

Video transmission over wireless networks  

E-Print Network (OSTI)

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

175

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

176

National Transmission Grid Study: 2002  

Energy.gov (U.S. Department of Energy (DOE))

National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

177

OpenEI Community - transmission  

Open Energy Info (EERE)

black out brown out bulk power system electricity grid future grid grid history security Smart Grid transmission Smart Grid Fri, 31 Oct 2014 17:58:14 +0000 Dc 955 at...

178

Happy Earth Day 2011! | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Day 2011! Day 2011! Happy Earth Day 2011! April 22, 2011 - 7:30am Addthis Allison Casey Senior Communicator, NREL Happy Earth Day! Today, April 22, marks the 41st anniversary of Earth Day. Check out these resources from the Department of Energy to help you celebrate, get in the Earth Day spirit, and take action: Earth Day Website This page from the Office of Energy Efficiency and Renewable Energy highlights other great resources to help you be energy efficient and Earth-friendly Earth Day 2011 Outreach Materials These materials from the Federal Energy Management Program will help you develop a workplace energy awareness program and "Act Now; Together We Can Create a Greener Future." Happy Earth Day! If you haven't already shared how you're celebrating, be sure to e-mail your responses to the Energy Saver team at

179

Microsoft Word - John_Day-Big_Eddy_2-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mark Kjelland Mark Kjelland Project Manager - TEP-TPP-3 Proposed Action: John Day-Big Eddy No. 2 500-kV Transmission Line Reconductor Budget Information: Work Order 232282 Task 01 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including...tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers and crossarms. Location: Sherman and Wasco counties, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to reconductor 3 approximately 1-mile long sections of the John Day-Big Eddy No. 2 500-kV transmission line. The project involves removing the

180

Negative differential transmission in graphene  

Science Journals Connector (OSTI)

By using the Kubo linear response theory with the Keldysh Green function approach, we investigate the mechanism leading to the negative differential transmission in a system with the equilibrium electron density much smaller than the photon-excited one. It is shown that the negative differential transmission can appear at low probe-photon energy (in the order of the scattering rate) or at high energy (much larger than the scattering rate). For the low probe-photon energy case, the negative differential transmission is found to come from the increase of the intraband conductivity due to the large variation of electron distribution after the pumping. As for the high probe-photon energy case, the negative differential transmission is shown to tend to appear with the hot-electron temperature being closer to the equilibrium one and the chemical potential higher than the equilibrium one but considerably smaller than half of the probe-photon energy. We also show that this negative differential transmission can come from both the inter- and the intraband components of the conductivity. Especially, for the interband component, its contribution to the negative differential transmission is shown to come from both the Hartree-Fock self-energy and the scattering. Furthermore, the influence of the Coulomb-hole self-energy is also addressed.

B. Y. Sun and M. W. Wu

2013-12-17T23:59:59.000Z

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

182

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

183

Briefing Memo: Petroleum Product Transmission & Distribution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Briefing Memo: Petroleum Product Transmission & Distribution Briefing Memo: Petroleum Product Transmission & Distribution Click below to download a PDF of the briefing memo....

184

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

185

Agenda: Natural Gas: Transmission, Storage and Distribution ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas: Transmission, Storage and Distribution Agenda: Natural Gas: Transmission, Storage and Distribution A Public Meeting on the Quadrennial Energy Review, Hosted by the...

186

2006 National Electric Transmission Congestion Study Federal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

187

National Electric Transmission Congestion Study | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

188

2009 National Electric Transmission Congestion Study | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

189

Electric Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Electric Transmission SitingLegal Abstract Electric Transmission Siting at the California...

190

2006 National Electric Transmission Congestion Study | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

191

National Electric Transmission Congestion Study Workshops | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

192

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

193

Agenda: Electricity Transmission and Distribution - East | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission and Distribution - East Agenda: Electricity Transmission and Distribution - East A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

194

Agenda: Electricity Transmission, Storage and Distribution -...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission, Storage and Distribution - West Agenda: Electricity Transmission, Storage and Distribution - West A Public Meeting on the Quadrennial Energy Review,...

195

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

196

Directly correlated transmission electron microscopy and atom...  

NLE Websites -- All DOE Office Websites (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

197

DOE Co-Spnsors Earth Day Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Co-Sponsors Earth Day Activities DOE Co-Sponsors Earth Day Activities Free trees and native plants are available to the first participants at the Idaho Falls Earth Day festivities in Tautphaus Park. There are a number of educational and environmentally-oriented activities for children at the Earth Day celebration. This year's Earth Day in April marks the 38th celebration of its kind since former Senator Gaylord Nelson first set aside the day in 1970 to honor the environment in which we live. Now Earth Day has expanded across the globe as nearly over a billion people celebrate with events, both large and small, in nearly 200 hundred different countries. Idaho Falls will join the celebration on Saturday, April 26 at the Tautphaus Park Zoo and Hockey Shelter. The Idaho Falls Earth Day Celebration will be held from 10 a.m. to

198

Earth Day 2014 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

celebrating Earth Day all week long. It's Earth Week on Energy.gov We're focusing on climate change, highlighting Earth Day events and sharing ways Americans ActOnClimate --...

199

User Day 2012 II Poster Session  

E-Print Network (OSTI)

User Day 2012 II Poster Session Program I Poster Session Day 2 09:00 - 09:30 Coffee (1st Floor:15 Coffee Break & Poster Session (1st Floor) Participants are required to vote for the best poster during, CSCS Conclusions and Poster Award 15:45 - 16:30 User Feedback and Discussion Day 1 12:00 - 13

200

ScheduleDay 1: Molecular Evolution Introduction  

E-Print Network (OSTI)

-Cantor Model Do Exercise Read Ponting, study slides from day 3 and find questions. Day 3: Comparative Genomics Lecture: Comparative Genomics Prepare Projects Practical: Models of Sequence Evolution Read HSW1, study questions. Day 10: Projects Project 1 ­ Population Genomics: Selective Sweeps Project 2 ­ Molecular

Goldschmidt, Christina

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Career Map: Power Systems/Transmission Engineer  

Energy.gov (U.S. Department of Energy (DOE))

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

202

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

203

Transmission Lines Emulating Moving Media  

E-Print Network (OSTI)

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

204

Celebrate Earth Day! | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Day! Earth Day! Celebrate Earth Day! April 20, 2010 - 10:25am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory Earth Day is a great time to commit to protecting the environment and saving money and energy at home. This year, April 22 marks the 40th anniversary of Earth Day. In spring 1970, Sen. Gaylord Nelson created Earth Day to "force this issue onto the national agenda." Addressing the Earth Day 1970 audience in Denver, Colo., Nelson said, "Our goal is not just an environment of clean air and water and scenic beauty. The objective is an environment of decency, quality and mutual respect for all other human being and all living creatures." I think Sen. Nelson would be proud of the current level of enthusiasm

205

Celebrate Earth Day! | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Celebrate Earth Day! Celebrate Earth Day! Celebrate Earth Day! April 20, 2010 - 10:25am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory Earth Day is a great time to commit to protecting the environment and saving money and energy at home. This year, April 22 marks the 40th anniversary of Earth Day. In spring 1970, Sen. Gaylord Nelson created Earth Day to "force this issue onto the national agenda." Addressing the Earth Day 1970 audience in Denver, Colo., Nelson said, "Our goal is not just an environment of clean air and water and scenic beauty. The objective is an environment of decency, quality and mutual respect for all other human being and all living creatures." I think Sen. Nelson would be proud of the current level of enthusiasm

206

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

207

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network (OSTI)

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

208

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network (OSTI)

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

209

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

210

Power Transmission, Distribution and Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

211

Holocaust Days of Remembrance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Holocaust Days of Remembrance Holocaust Days of Remembrance Holocaust Days of Remembrance April 7, 2013 12:30PM EDT to April 14, 2013 12:45PM EDT Celebrated nation-wide The United States Congress established the Days of Remembrance as our nation's annual commemoration of the Holocaust and created the United States Holocaust Memorial Museum as a permanent living memorial to the victims. Holocaust Remembrance Day is Monday, April 8, 2013. The Museum designated Never Again: Heeding the Warning Signs as the theme for the 2013 observance. In accordance with its Congressional mandate, the Museum is responsible for leading the nation in commemorating the Days of Remembrance, and for encouraging and sponsoring appropriate observances throughout the United States. Observances and remembrance activities can occur during the week of

212

Lab joins in global Earth Day celebrations  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab joins in global Earth Day celebrations Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: Dec. 2014 - Jan. 2015 All...

213

2014 Earth Day Photo Contest Winners  

Office of Environmental Management (EM)

2014 Earth Day Photo Contest Winners COMMUNITY: "Edison Home" by Gary Hartman SUSTAINABILITY: "Oak Alley" by Wade Sickinger ALTERNATIVE ENERGY: "Windmill Ablaze at Sunset" by Leroy...

214

Smithsonian's Museum Day at Bradbury Science Museum  

NLE Websites -- All DOE Office Websites (Extended Search)

Museum Day is when museums and cultural institutions across the nation open their doors free of charge to Smithsonian magazine subscribers and Smithsonian.com visitors. September...

215

Solar Day-Lighting Using Optical Fibers  

Science Journals Connector (OSTI)

Green lighting alternatives can substantially reduce electricity consumption. Solar day-lighting system, by transporting the concentrated sunlight through optical fibers, has been...

Kumar, Naveen; Patil, Sanket

216

2014 Earth Day | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

2014 Earth Day celebration, children from Argonne's Child Development Center planted a White Oak tree and participated in an environmental learning activity. 2014 Argonne Earth...

217

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

218

Green Clean Day Planning Guide A practical guide for creating a successful Green Clean Day  

E-Print Network (OSTI)

Green Clean Day Planning Guide A practical guide for creating a successful Green Clean Day A publication of U of M Waste Management Services July 2013 #12;Table of Contents What is a Green Clean Day? 2 Why have a Green Clean Day? 2 How Do We Get Started? 2 How Waste Management Services Can Help 2

Awtar, Shorya

219

2013 Transmission Reliability R&D Peer Review Presentations Available |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Transmission Reliability R&D Peer Review Presentations 3 Transmission Reliability R&D Peer Review Presentations Available 2013 Transmission Reliability R&D Peer Review Presentations Available September 9, 2013 - 3:25pm Addthis The agendas and presentations from the June and August 2013 Transmission Reliability R&D Program reviews are now available for download. The June 27-28 Transmission Reliability Program review combined the North American Synchrophasor Initiative (NASPI) and Advanced Application Development subprograms. The 2-day review included an overview of the program and six sessions of presentations from researchers funded by OE. The NASPI working group addresses the installation of synchrophasor networks across the United States with Recovery Act Smart Grid Investment Grant funds. Advanced Application Development projects include

220

Agent Notes Day 4 ~ Health Training  

E-Print Network (OSTI)

­ Agent Notes Day 4 ~ Health Training In preparation for the Health Day, you could order the National Institute on Aging, National Institutes of Health. To order these free booklets, go to www in the afternoon, and edit your agenda to reflect your choices. Several HealthHints newsletters are referenced

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Heating degree days | OpenEI  

Open Energy Info (EERE)

Heating degree days Heating degree days Dataset Summary Description The National Oceanic and Atmospheric Administration's (NOAA) National Environmental Satellite, Data, and Information Services (NESDIS), in conjunction with the National Climatic Data Center (NCDC) publish monthly and annual climate data by state for the U.S., including, heating degree days (total number of days per month and per year). The average values for each state are weighted by population, using 2000 Census data. The base temperature for this dataset is 65 degrees F. Source NOAA Date Released Unknown Date Updated June 24th, 2005 (9 years ago) Keywords climate Heating degree days NOAA Data application/vnd.ms-excel icon Heating Degree Data, by State (xls, 208.4 KiB) Quality Metrics Level of Review Some Review

222

NETL 2011 Earth Day Poster Contest Winners  

NLE Websites -- All DOE Office Websites (Extended Search)

Earth Day Poster Contest Winners Earth Day Poster Contest Winners 2011 Earth Day Poster Winners Announced We are proud to announce the winners of the 2011 NETL Earth Day Poster contest. Students from schools across the country participated this year and we have chosen the top three entries in each grade (K-5). NETL Earth Day medals will be presented to all winners and certificates will be given to all participants. Photos of the winning entries are displayed below by grade. * Click on picture to bring up a larger PDF version * 2012, 2011, 2010, 2009, 2008, 2007, 2006 Kindergarten Winners First Grade Winners Second Grade Winners Kindergarten First Grade Second Grade Third Grade Winners Fourth Grade Winners Fifth Grade Winners Third Grade Fourth Grade Fifth Grade Winners By Grade

223

Celebrating National Weatherization Day | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Weatherization Day Weatherization Day Celebrating National Weatherization Day November 1, 2010 - 1:55pm Addthis Watch the video above to get a firsthand look at the work happening in Wilkes-Barre, Pennsylvania under the weatherization program. Secretary Chu Secretary Chu Former Secretary of Energy This weekend, communities across the country celebrated National Weatherization Day, highlighting the important work happening nationwide to save money for America's homeowners by investing in energy efficiency. As a result of the Recovery Act weatherization program, more than 245,000 low-income families have had their homes upgraded, which means these families are paying lower energy bills every month. The program has also helped to put thousands of workers on the job every day, helping to grow

224

Conflict Resolution Day | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conflict Resolution Day Conflict Resolution Day Conflict Resolution Day October 18, 2012 10:00AM EDT All events in the Department of Energy's Forrestal Main Auditorium, Germantown employees can watch a VTC broadcast in Germantown A-117 and Cloverleaf 2071. Conflict Resolution Day takes a look at mediation, conciliation, negotiation, arbitration, the ombudsman, and facilitation to resolve conflict in the workplace. Employees and contractors are invited to join for any/all of the following events: 10:00am - 10:30am Cookies, Coffee, and Conversation 10:30am - 11:30am Self-Mediation presentation 11:30am - 12:00pm De-Stressing in a Stressful Environment presentation 12:00pm - 1:00pm Informal Information Session 1:00pm - 2:00pm Ergonomics IL Creations Forrestal Cafetaria will be offering a Conflict Resolution Day

225

cooling degree days | OpenEI  

Open Energy Info (EERE)

cooling degree days cooling degree days Dataset Summary Description The National Oceanic and Atmospheric Administration's (NOAA) National Environmental Satellite, Data, and Information Services (NESDIS), in conjunction with the National Climatic Data Center (NCDC) publish monthly and annual climate data by state for the U.S., including, cooling degree days (total number of days per month and per year). The average values for each state are weighted by population, using 2000 Census data. The base temperature for this dataset is 65 degrees F. Source NOAA Date Released Unknown Date Updated June 24th, 2005 (9 years ago) Keywords climate cooling degree days NOAA Data application/vnd.ms-excel icon hcs_51_avg_cdd.xls (xls, 215.6 KiB) Quality Metrics Level of Review Some Review

226

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

227

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

228

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

229

Recovery Act Interconnection Transmission Planning  

Energy.gov (U.S. Department of Energy (DOE))

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

230

Earth Day 2012: A Day to Remember the Past and Shape the Future |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Day 2012: A Day to Remember the Past and Shape the Future Earth Day 2012: A Day to Remember the Past and Shape the Future Earth Day 2012: A Day to Remember the Past and Shape the Future April 26, 2012 - 10:10am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy Last Sunday was Earth Day 2012. That day, many of us took a moment for contemplation, and stepped back to reexamine how we use the natural resources that our amazing planet offers us. Perhaps we took time to think about the some of the historical events led to the first Earth Day in 1970. A colleague of mine, for example, went to Rockville, Maryland, to visit the cemetery where Rachel Carson, author of Silent Spring, is memorialized for generations to come. For those of you unfamiliar with Carson's work, she was one of the 20th century's most

231

Earth Day 2012: A Day to Remember the Past and Shape the Future |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Earth Day 2012: A Day to Remember the Past and Shape the Future Earth Day 2012: A Day to Remember the Past and Shape the Future Earth Day 2012: A Day to Remember the Past and Shape the Future April 26, 2012 - 10:10am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy Last Sunday was Earth Day 2012. That day, many of us took a moment for contemplation, and stepped back to reexamine how we use the natural resources that our amazing planet offers us. Perhaps we took time to think about the some of the historical events led to the first Earth Day in 1970. A colleague of mine, for example, went to Rockville, Maryland, to visit the cemetery where Rachel Carson, author of Silent Spring, is memorialized for generations to come. For those of you unfamiliar with Carson's work, she was one of the 20th century's most

232

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

233

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

234

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

235

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission...

236

Ebola virus transmission in guinea pigs  

Science Journals Connector (OSTI)

...Rights Reserved. 2014 research-article Ebola virus transmission in guinea pigs Gary...School of Medicine, Philadelphia, PA, USA Ebola virus (EBOV) transmission is currently...movement over short distances. Importance Ebola is generally thought to be spread between...

Gary Wong; Xiangguo Qiu; Jason S. Richardson; Todd Cutts; Brad Collignon; Jason Gren; Jenna Aviles; Carissa Embury-Hyatt; Gary P. Kobinger

2014-11-12T23:59:59.000Z

237

MagLab - Transmission Lines Tutorial  

NLE Websites -- All DOE Office Websites (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

238

Transmission Issues and Power Exchanges in Texas  

E-Print Network (OSTI)

on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult...

Hughes, H. L.

239

Vibration Transmission through Symmetric Resonant Couplings  

Science Journals Connector (OSTI)

15 March 1994 research-article Vibration Transmission through Symmetric Resonant Couplings D. J. Allwright...Blakemore P. R. Brazier-Smith J. Woodhouse The transmission of vibration through a symmetric junction is considered. The problem is...

1994-01-01T23:59:59.000Z

240

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

242

Mountain States Transmission Intertie (MSTI) Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

243

Sandia National Laboratories: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure Security, Modeling, Modeling & Analysis, News, News & Events, Renewable Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia...

244

Microsoft Word - CX-Slatt-John Day Spacers_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2010 4, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Corinn Castro Project Manager - TELM-TPP-3 Proposed Action: Replace spacer dampers along the Slatt-John Day No. 1 500-kV transmission line Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1681 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designed purpose. Proposed by: Bonneville Power Administration (BPA) Location: BPA's proposed Slatt-John Day No. 1 Transmission Line Spacer Replacement

245

Integrated Transmission and Distribution Control  

SciTech Connect

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: Develop a simulation environment for integrating transmission and distribution control, Construct reduced-order controllable models for smart grid assets at the distribution level, Design and validate closed-loop control strategies for distributed smart grid assets, and Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

246

BPA, Electric Transmission Overview, October 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

247

The real problem with Merchant transmission  

SciTech Connect

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

248

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network (OSTI)

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

249

Vice President Biden Kicks Off Five Days of Earth Day Activities with  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vice President Biden Kicks Off Five Days of Earth Day Activities Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort April 21, 2010 - 12:00am Addthis Washington, D.C. -- Vice President Biden will today kick off five days of Administration events around the 40th anniversary of Earth Day with the announcement of the selection of 25 communities for up to $452 million in Recovery Act funding to "ramp-up" energy efficiency building retrofits. Under the Department of Energy's Retrofit Ramp-Up initiative, communities, governments, private sector companies and non-profit organizations will work together on pioneering and innovative programs for concentrated and

250

Vice President Biden Kicks Off Five Days of Earth Day Activities with  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vice President Biden Kicks Off Five Days of Earth Day Activities Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort April 21, 2010 - 12:00am Addthis Washington, D.C. -- Vice President Biden will today kick off five days of Administration events around the 40th anniversary of Earth Day with the announcement of the selection of 25 communities for up to $452 million in Recovery Act funding to "ramp-up" energy efficiency building retrofits. Under the Department of Energy's Retrofit Ramp-Up initiative, communities, governments, private sector companies and non-profit organizations will work together on pioneering and innovative programs for concentrated and

251

Laboratory Directed Research & Development (LDRD) Day  

NLE Websites -- All DOE Office Websites (Extended Search)

Programs » Programs » Laboratory Directed Research & Development » Laboratory Directed R&D Day Laboratory Directed Research and Development Day National security depends on science and technology. The United States relies on Los Alamos National Laboratory for the best of both. No place on Earth pursues a broader array of world-class scientific endeavors. Contact Andrea Maestas LDRD Program (505) 667-1230 Email LDRD Day 2012 Learn how LDRD innovations benefit our nation Los Alamos National Laboratory hosted its fourth annual Laboratory Directed Research and Development (LDRD) Day on October 23, 2012, at Buffalo Thunder in Pojoaque, New Mexico. More than 30 scientists and engineers from the Lab presented posters about their LDRD projects, answering questions and

252

NETL 2012 Earth Day Poster Contest Winners  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Earth Day Poster Winners Announced 3 Earth Day Poster Winners Announced We are proud to announce the winners of the 2013 NETL Earth Day Poster contest. Students from schools across the country participated this year and we have chosen the top three entries in each grade (K-5). NETL Earth Day medals will be presented to all winners and certificates will be given to all participants. Photos of the winning entries are displayed below by grade. * Click on picture to bring up a larger PDF version * 2013, 2012, 2011, 2010, 2009, 2008, 2007, 2006 Kindergarten Winners First Grade Winners Second Grade Winners Kindergarten First Grade Second Grade Third Grade Winners Fourth Grade Winners Fifth Grade Winners Third Grade Fourth Grade Fifth Grade Winners By Grade Kindergarten 1st - Natalie Esposito - Suncrest Primary, Morgantown, WV

253

Volunteer Day | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Volunteer Day Volunteer Day Volunteer Day Posted: February 11, 2013 - 3:48pm | Y-12 Report | Volume 9, Issue 2 | 2013 For 10 years, Y-12 employees and their friends and family members have donated lots of sweat equity and talent to improve their communities through an annual Day of Volunteering. From caring for llamas to sprucing up playgrounds and picnic areas to stocking donated food items, employees are willing to roll up their T-shirt sleeves and lend a hand. Libraries, animal shelters, food pantries, elder care facilities and schools are among the nonprofit organizations served. By the numbers 400+ Charitable Projects Worked 6,000+ Employee and Family Member Volunteers 9 Counties Served "I was taught by my mother to crochet when I was a little girl, and it excites me to be able to use the skill taught to me as a child to help a

254

Smithsonian's Museum Day at Bradbury Science Museum  

NLE Websites -- All DOE Office Websites (Extended Search)

Smithsonian's Museum Day Smithsonian's Museum Day Smithsonian's Museum Day at Bradbury Science Museum Museum Day is when museums and cultural institutions across the nation open their doors free of charge to Smithsonian magazine subscribers and Smithsonian.com visitors. September 22, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

255

NETL 2012 Earth Day Poster Contest Winners  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Earth Day Poster Winners Announced 2 Earth Day Poster Winners Announced We are proud to announce the winners of the 2012 NETL Earth Day Poster contest. Students from schools across the country participated this year and we have chosen the top three entries in each grade (K-5). NETL Earth Day medals will be presented to all winners and certificates will be given to all participants. Photos of the winning entries are displayed below by grade. * Click on picture to bring up a larger PDF version * 2013, 2012, 2011, 2010, 2009, 2008, 2007, 2006 Kindergarten Winners First Grade Winners Second Grade Winners Kindergarten First Grade Second Grade Third Grade Winners Fourth Grade Winners Fifth Grade Winners Third Grade Fourth Grade Fifth Grade Winners By Grade Kindergarten 1st Place - Wyatt N. - Franklin Elementary - Vanderbilt, PA

256

4th Day Energy | Open Energy Information  

Open Energy Info (EERE)

Day Energy Day Energy Jump to: navigation, search Logo: 4th Day Energy Name 4th Day Energy Address 38886 River Belle Place Tollhouse, California Zip 93667 Sector Solar Product Solar electric systems Year founded 1992 Phone number 877-484-3291 Website http://www.4thdayenergy.com Coordinates 37.0009989°, -119.3947135° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.0009989,"lon":-119.3947135,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

257

All Day Solar | Open Energy Information  

Open Energy Info (EERE)

All Day Solar Place: LaPorte, Indiana Zip: 46350 Product: Indiana-based development stage company planning to manufacture flexible thin-film PV modules for vehicular rooftop...

258

SPIDERS Joint Capability Technology Demonstration Industry Day...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Demonstration Industry Day May 2, 2014 - 1:15pm Addthis An image of a patch with a spider on it. The Smart Power Infrastructure Demonstration for Energy...

259

Days on market and home sales  

E-Print Network (OSTI)

In 2006, Massachusetts adopted a new policy that prohibits home sellers from resetting their properties days on market through relisting. Massachusetts homes exposed to the policy change experienced a $16,000 reduction ...

Tucker, Catherine Elizabeth

260

Fact #802: November 4, 2013 Market Share by Transmission Type...  

Energy Savers (EERE)

2: November 4, 2013 Market Share by Transmission Type Fact 802: November 4, 2013 Market Share by Transmission Type The variety of transmission technologies has increased as...

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Western-UGP Transmission and Ancillary Services Rates Customer...  

NLE Websites -- All DOE Office Websites (Extended Search)

80 Percentage of transmission plant included in UMZ Rates (line 79 line 76) TP 1.00000 TRANSMISSION EXPENSES 81 Total transmission expenses (sum lines 41 to 43,...

262

RAPID/BulkTransmission/About | Open Energy Information  

Open Energy Info (EERE)

Contribute Contact Us About Bulk Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry...

263

RAPID/Geothermal/Transmission Siting & Interconnection/Nevada...  

Open Energy Info (EERE)

Siting Agency: Public Utilities Commission of Nevada Transmission Siting Transmission lines over 200 kV are handled by the state's CPCN process. Siting of transmission lines with...

264

2013 Introduce a Girl to Engineering Day | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Introduce a Girl to Engineering Day Introduce a Girl to Engineering Day Introduce a Girl to Engineering Day 2013 1 of 26 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 1 of 26 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 2 of 26 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 3 of 26 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 4 of 26 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 5 of 26 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 6 of 26 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 7 of 26 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013

265

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

266

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

267

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

268

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

269

Relativistic tunneling and accelerated transmission  

E-Print Network (OSTI)

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

270

FPL's Christmas 1991 transmission outages  

SciTech Connect

A record number of contamination related outages occurred on FPL transmission lines during Christmas of 1991 and resulted in an investigation of inservice insulator performance. The field investigation process used was enhanced by recent improvements in outage data recording. Also used in the analysis were weather information, the results of recently completed accelerated aging tests of polymers, and specially conducted tests on the effects of weathering steel stain on porcelain insulators. Specific insulator problems were identified and actions taken to reduce the possibility of recurrence.

Burnham, J.T.; Busch, D.W.; Renowden, J.D. (Florida Power Light Co., Juno Beach, FL (United States). Transmission Line Dept.)

1993-10-01T23:59:59.000Z

271

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

272

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

273

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

274

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

275

Open Access Transmission and Renewable Energy Technologies  

SciTech Connect

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

276

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network (OSTI)

large, but conceptual, transmission lines such as the C/PNW-very conceptual transmission lines that resemble radialand voltage of transmission lines added in the study, as

Wiser, Ryan

2014-01-01T23:59:59.000Z

277

Transmission of the Severe Acute Respiratory Syndrome on Aircraft  

Science Journals Connector (OSTI)

...also be transmitted through airborne routes. Other potential modes of transmission include contact with contaminated fomites, contact resulting from the movement of the passengers closer together during the flight, and contact occurring in waiting areas or lines immediately before boarding or after disembarkation... This careful study is based on interviews of passengers and crew members on three flights that carried patients with the severe acute respiratory syndrome (SARS). Twenty-two persons became ill a mean of four days after one of the flights. The risk was highest among the passengers seated within three rows in front of the symptomatic index patient (relative risk, 3.1).

Olsen S.J.; Chang H.-L.; Cheung T.Y.-Y.

2003-12-18T23:59:59.000Z

278

Earth Day Coalition | Open Energy Information  

Open Energy Info (EERE)

Day Coalition Day Coalition Jump to: navigation, search Name Earth Day Coalition Address 3606 Bridge Avenue, Suite 4 Place Cleveland, Ohio Zip 44113 Coordinates 41.4829135°, -81.7117416° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.4829135,"lon":-81.7117416,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

279

Earth Day event showcases LANL energy work  

NLE Websites -- All DOE Office Websites (Extended Search)

Earth Day showcases energy work Earth Day showcases energy work Earth Day event showcases LANL energy work The public is invited to learn about projects in energy conservation, generation, research, and management at an Energy Town Hall April 21. April 19, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Contact

280

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

DOE at Day One | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at Day One at Day One DOE at Day One October 1, 2012 - 1:41pm Addthis Dr. James R. Schlesinger, the first Secretary of Energy, unveils the signplate at the Energy Department's temporary headquarters on October 1, 1977. Dr. James R. Schlesinger, the first Secretary of Energy, unveils the signplate at the Energy Department's temporary headquarters on October 1, 1977. Terry Fehner Terry Fehner Historian, Federal Preservation Officer Thirty-five years after the Energy Department first opened its doors, DOE's work remains vital and urgent -- and we are ready for the challenges ahead. For more information about the Energy Department's history, see our History. "The Department of Energy opened its doors today," declared the Department's first press release on October 1, 1977. Dr. James R.

282

Halloween (+7 Days) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Halloween (+7 Days) Halloween (+7 Days) Halloween (+7 Days) November 7, 2011 - 1:34pm Addthis Drew Bittner Web Manager, Office of Energy Efficiency and Renewable Energy Well, it's now a week after All Hallow's Eve. If you're like my family, most of the candy's been eaten and you're down to that last half-crushed chocolate bar or licorice stick, as well as seeing the discarded bits of costume still here and there-my daughter's having a hard time giving up her night as a superhero. Walking around while my girl went on her first trick-or-treat, I thought about the homes we were visiting. Several of them were brightly lit, so as to tell kids they were "home," and some had their porch lights on but no lights on inside. It might be disappointing to the kids that a lit-up porch is not a place to

283

Halloween (+7 Days) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Halloween (+7 Days) Halloween (+7 Days) Halloween (+7 Days) November 7, 2011 - 1:34pm Addthis Drew Bittner Web Manager, Office of Energy Efficiency and Renewable Energy Well, it's now a week after All Hallow's Eve. If you're like my family, most of the candy's been eaten and you're down to that last half-crushed chocolate bar or licorice stick, as well as seeing the discarded bits of costume still here and there-my daughter's having a hard time giving up her night as a superhero. Walking around while my girl went on her first trick-or-treat, I thought about the homes we were visiting. Several of them were brightly lit, so as to tell kids they were "home," and some had their porch lights on but no lights on inside. It might be disappointing to the kids that a lit-up porch is not a place to

284

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

285

Celebrating Pi Day | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pi Day Pi Day Celebrating Pi Day March 14, 2013 - 1:29pm Addthis A mathematical formula discovered a decade ago in part by David H. Bailey (above), the Chief Technologist of the Computational Research Department at the Lawrence Berkeley National Laboratory, was the basis for researchers to find the sixty-trillionth binary digit of Pi-squared. | Photo Courtesy of Lawrence Berkely National Lab A mathematical formula discovered a decade ago in part by David H. Bailey (above), the Chief Technologist of the Computational Research Department at the Lawrence Berkeley National Laboratory, was the basis for researchers to find the sixty-trillionth binary digit of Pi-squared. | Photo Courtesy of Lawrence Berkely National Lab Michael Hess Michael Hess Former Digital Communications Specialist, Office of Public Affairs

286

Thirty-Day Readmissions Truth and Consequences  

Science Journals Connector (OSTI)

...patients are not readmitted as many as 4 weeks after discharge events that are largely outside the hospitals' control. But the most important consequence of this policy is the improvements in quality and safety that hospitals will forgo, and those will be far more difficult to measure. Under the Affordable Care Act, hospitals with worse than expected 30-day readmission rates will be penalized by Medicare. But though a focus on readmissions may have good face validity, the policy attention to 30-day readmissions may be misguided.

Joynt K.E.; Jha A.K.

2012-04-12T23:59:59.000Z

287

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60-DAY Federal Register Notice - Proposed 60-DAY Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the

288

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network (OSTI)

wind with transmission alternative 7b (500 kV AC line fromkV line CAISO - A4 Central California Clean Energy TransmissionTransmission Line: Transmission Development Facilities Application Volume One MATL New 230 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

289

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

290

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

291

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

292

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

293

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

294

Regional Transmission Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

295

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

296

Transmission Electron Microscope and Scanning Electron Microscopes -  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

297

Checklist 2 The first days in Germany  

E-Print Network (OSTI)

Checklist 2 The first days in Germany Further information and explanations for the following points (former E111 or E128) or EHIC-Card to one of the social insurers in Germany. You will then be issued in Germany! Only when you have a permanent address you can register with the Citizens' Bureau (Bürgerbüro

Kemper, Gregor

298

FOREST HEALTH DAY Thursday 20 September 2012  

E-Print Network (OSTI)

Sarah Green, Forest Research 1130 - Comfort break (Tea/Coffee) 1145 - Insect pests of trees in Scotland 272440 There will be no charge for this event. Tea, coffee and a light lunch will be provided and disease issues in the field. #12;FOREST HEALTH DAY 0930 - Registration, tea/coffee 1000 - Welcome

299

Seven days at IBM ibmannualreport2002  

E-Print Network (OSTI)

our company. We had to deal with a continuing tough economic climate, particularly for the information Machines Corporation, this mid-size U.S. company declares its loftier ambitions. february 14, 1924 #12;day and change the course of modern computing--and modern business. april 7, 1964 #12;#12;in 1989, ibm's don

300

Iceman in the cold light of day  

Science Journals Connector (OSTI)

... of Forensic Medicine, where it was photographed and fingered by members of the local press. The day after the body arrived in Innsbruck, Konrad Spindler, of the ... the original pathologist. The official hypothesis is that the corpse was mummified by a warm wind, an autumn ...

Paul G. Bahn; Katharine Everett

1993-03-04T23:59:59.000Z

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DayStar Technologies | Open Energy Information  

Open Energy Info (EERE)

DayStar Technologies DayStar Technologies Jump to: navigation, search Logo: DayStar Technologies Name DayStar Technologies Address 2972 Stender Way Place Santa Clara, California Zip 95054 Sector Solar Product Manufacturer of low-cost, high performance, CIGS thin film photovoltaic products Year founded 1997 Number of employees 51-200 Phone number 408-582-7100 Website http://www.daystartech.com/ Coordinates 37.375996°, -121.970815° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.375996,"lon":-121.970815,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

302

One day seminar: Genetics and Genomics of  

E-Print Network (OSTI)

SCHOOL OF MEDICINE One day seminar: Genetics and Genomics of Infectious Diseases Malaria and TB 14th June 2013 University of St Andrews - School of Medicine Pathogen genome research allows exquisite to understanding disease progression. Pathogen genome sequencing is accessible to most. Outputs have broad

Brierley, Andrew

303

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

304

1333 day-use recreation area [n] [US] (1)  

Science Journals Connector (OSTI)

recr. (Area which is frequented by ? day trippers [US] /day-trippers [UK]; ? hiking area [US] /rambling area [UK]); s...

2010-01-01T23:59:59.000Z

305

NREL: Transmission Grid Integration - Research Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

306

RRTT - Rapid Response Team for Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

307

Richard Shaheen named Senior VP of Transmission  

NLE Websites -- All DOE Office Websites (Extended Search)

and operational accomplishments that will serve BPA well as we continue to strengthen our safety culture, sustain our core transmission assets and modernize our electric grid."...

308

Category:NEPA Transmission | Open Energy Information  

Open Energy Info (EERE)

Pages in category "NEPA Transmission" This category contains only the following page. T TransWest Retrieved from "http:en.openei.orgwindex.php?titleCategory:NEPATransmiss...

309

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network (OSTI)

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the (more)

Malathi, V

2014-01-01T23:59:59.000Z

310

Big Bend-Witten Transmission Line Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

311

Natural Gas Transmission and Distribution Module  

U.S. Energy Information Administration (EIA) Indexed Site

31, 2012, Washington, DC Major assumption changes for AEO2013 Oil and Gas Working Group Natural Gas Transmission and Distribution Module DRAFT WORKING GROUP PRESENTATION DO NOT...

312

Detonator comprising a nonlinear transmission line  

DOE Patents (OSTI)

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

313

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

314

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives for Hydrogen Delivery Workshop May 7- 8, 2003 U.S. Department of Energy Hydrogen, Fuel Cells,...

315

Nevada Transmission Siting Information | Open Energy Information  

Open Energy Info (EERE)

Siting Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Transmission Siting...

316

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

mittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah...

317

Webinar: Understanding the Interconnection and Transmission Service...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Energy Sufficiency and Economic Development U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study U.S....

318

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

NLE Websites -- All DOE Office Websites (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

319

Electricity Transmission, A Primer | Open Energy Information  

Open Energy Info (EERE)

A Primer Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Electricity Transmission, A Primer Authors Matthew H. Brown, National Conference of State...

320

SunZia Southwest Transmission Project Comments  

Energy Savers (EERE)

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Williston to Stateline Transmission Line Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

322

Grand Coulee Transmission Line Replacement Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

323

Crews repair transmission lines after Washington wildfire  

NLE Websites -- All DOE Office Websites (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

324

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

325

Final Report Navajo Transmission Project (NTP)  

SciTech Connect

The Din Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

326

Comments of New England Electric Transmission Corporation on Proposed Open  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

327

Political Campaigning and Other Non-University Events on Game Days or Major Event Days  

E-Print Network (OSTI)

Political Campaigning and Other Non-University Events on Game Days or Major Event Days This Policy of this is the prohibition of any political signage implanted in, posted on, or otherwise affixed to University property in the political process, subject to other governing policies and procedures. Students: http

Oklahoma, University of

328

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

329

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

330

Day, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Day, Wisconsin: Energy Resources Day, Wisconsin: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 44.7193807°, -90.0186555° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.7193807,"lon":-90.0186555,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

331

What is a High Electric Demand Day?  

Energy.gov (U.S. Department of Energy (DOE))

This presentation by T. McNevin of the New Jersey Bureau of Air Quality Planning was part of the July 2008 Webcast sponsored by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Weatherization and Intergovernmental Program Clean Energy and Air Quality Integration Initiative that was titled Role of Energy Efficiency and Renewable Energy in Improving Air Quality and Addressing Greenhouse Gas Reduction Goals on High Electric Demand Days.

332

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

333

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

334

Electric Transmission Line Flashover Prediction System  

E-Print Network (OSTI)

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

335

Transmission line protection based on travelling waves  

Science Journals Connector (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

336

Marketing Plan for Transmission Planning Services  

E-Print Network (OSTI)

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

337

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network (OSTI)

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

338

Physics of information representation, transmission and processing  

Science Journals Connector (OSTI)

The paper presents the theory of physical model of information representation, transmission and processing together with their features which yield into introduction of classical and quantum informatics principles. These features are mathematically described ... Keywords: information physics, information representation, quantum informatics, transmission and processing

Miroslav Svtek

2009-11-01T23:59:59.000Z

339

Ecological benefits of dc power transmission  

SciTech Connect

The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

Kutuzova, N. B. [JSC 'NIIPT' (Russian Federation)

2011-05-15T23:59:59.000Z

340

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network (OSTI)

Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap compression to fusion conditions Magnetic field of at least 5 T in a closed-field line topology Density ~ 1017

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Coordination of Federal Authorizations for Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

342

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

343

Environmental Assessment for the USK Loop Line 230 kV Transmission Project.  

SciTech Connect

This Environmental Assessment (EA) covers the transmission/substation facilities that would be constructed or modified. It has been prepared by an interdisciplinary team, as well as through consultation on the Federal, state and local levels. It is subject to a 60-day review by the general public and other agencies and will generally coincide with the release of the final state EIS. This EA presents an expansion of those transmission-related discussions in the state EIS where BPA could undertake their construction or modifiction.

United States. Bonneville Power Administration.

1985-09-01T23:59:59.000Z

344

An Apple a Day -- A Futuristic Parable  

Science Journals Connector (OSTI)

...thousands of sidewalk apple vendors. Second, studies of competition and regulation showed that the costs of apple production actually went up more rapidly in regulated industries than in competitive ones (see J. Zwanziger and G. Melnick, "Competition and Regulation in the Wholesale Fruit Industry," Free... It all began about 20 years ago, in early 1994, when somebody joked with Hillary Rodham Clinton that an apple a day keeps the doctor away, noting that this would provide the best cost control imaginable. The idea took root as if both Johnny and Joanie ...

Phelps C.E.

1994-03-17T23:59:59.000Z

345

CPD Event: Teaching day gives new perspectives  

Science Journals Connector (OSTI)

CPD Event: Teaching day gives new perspectives Workshop: IOP network devolops its ideas Conference: Conference offers much to teachers Event: Physics is made easy in Liverpool Communication: IOSTE debates the complexities of STE Conference: Teaching event excites in Exeter Meeting Invitation: Wales physics meeting invites bookings CPD Event: Science teachers get hands on with development Research: Conference highlights liquid crytstal research in teaching Education: Teachers give positive feedback Science Fair: Science fair brings physics to students Teaching: Conference explores trends in teaching Forthcoming events

346

CRSP Transmission Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

347

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

348

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

349

Day County Wind Project | Open Energy Information  

Open Energy Info (EERE)

County Wind Project County Wind Project Jump to: navigation, search Name Day County Wind Project Facility Day County Wind Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Basin Electric Location East of Groton SD Coordinates 45.457157°, -97.754831° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.457157,"lon":-97.754831,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

350

Instrument Series: Microscopy Environmental Transmission Electron Microscope  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Transmission Environmental Transmission Electron Microscope EMSL's environmental transmission electron microscope (ETEM) provides in situ capabilities that enable atomic-resolution imaging and spectroscopic studies of materials under dynamic operating conditions. In contrast to traditional operation of TEM under high vacuum, EMSL's ETEM uniquely allows imaging within high- temperature and gas environments-with a gas pressure up to 20 Torr. With a spherical aberration corrector for the objective lens, the ETEM captures atomic-level processes as they occur, enabling vital research across a range of scientific fields. Research Applications Chemical science and engineering - providing in situ observation of catalytic processes with atomic-level resolution Materials science and engineering - allowing

351

Microsoft PowerPoint - Meyer Day 2.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

states Scope of Reviews Load-side developments Load growth Energy efficiency and demand response programs Changes in generation, including distributed generation Transmission...

352

2012 Smart Grid Peer Review Presentations - Day 1 Morning Session...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Review Presentations - Day 1 Morning Session 2012 Smart Grid Peer Review Presentations - Day 1 Morning Session The Office of Electricity Delivery and Energy Reliability held its...

353

Secretary Moniz Warms Up For Earth Day Pitch | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Warms Up For Earth Day Pitch Secretary Moniz Warms Up For Earth Day Pitch Addthis Speakers Secretary Ernest Moniz Duration :32...

354

30-Day Federal Register Notice - Extension  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Extension [6450-01-P] DEPARTMENT OF ENERGY Agency Information Collection Extension AGENCY: U.S. Department of Energy. ACTION: Submission for Office of Management and Budget (OMB) review; comment request SUMMARY: The Department of Energy (DOE) has submitted an information collection request to the OMB for extension under the provisions of the Paperwork Reduction Act of 1995. The information collection requests a three-year extension of its {enter the Title of the collection from question number 7 on OMB Form 83-I}}, OMB Control Number 1910-{enter 4-digit control number}. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}..

355

30-Day Federal Register Notice - Extension  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Extension [6450-01-P] DEPARTMENT OF ENERGY Agency Information Collection Extension AGENCY: U.S. Department of Energy. ACTION: Submission for Office of Management and Budget (OMB) review; comment request SUMMARY: The Department of Energy (DOE) has submitted an information collection request to the OMB for extension under the provisions of the Paperwork Reduction Act of 1995. The information collection requests a three-year extension of its {enter the Title of the collection from question number 7 on OMB Form 83-I}}, OMB Control Number 1910-{enter 4-digit control number}. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}..

356

Microsoft Word - NIF Industry Day Agenda  

National Nuclear Security Administration (NNSA)

Department of Energy Department of Energy National Nuclear Security Administration Washington, DC 20585 National Nuclear Security Administration (NNSA) National Ignition Facility (NIF) Target Fabrication Industry Day at Lawrence Livermore National Laboratory (LLNL) Agenda 9:00 - 9:15 Welcome and orientation Mr. Roger Lewis, Assistant Deputy Administrator for Research, Development, Test Capabilities and Evaluation (Acting), NNSA Mr. John Post, Assistant Principal Associate Director, NIF and Photon Science, LLNL 9:15 - 9:30 Inertial Confinement Fusion (ICF) program, current and future status Mr. Roger Lewis 9:30 -10:30 National Ignition Facility (NIF), introduction and overview Mr. John Post 10:30 - 11:30 NIF/ICF Targets - Introduction, current technical requirements, anticipated future

357

Electricity Transmission Pricing: How Contracts Must Reflect Costs  

Science Journals Connector (OSTI)

This article sets out the main design elements of contracts for use of a transmission system and the basic methods of transmission pricing. It considers two methods of pricing transmission: top-down and bot...

Graham Shuttleworth

1996-01-01T23:59:59.000Z

358

Spatially and polarization resolved plasmon mediated transmission through continuous metal  

E-Print Network (OSTI)

Spatially and polarization resolved plasmon mediated transmission through continuous metal films Y transmission through an embedded undulated continuous thin metal film under normal incidence. 1D undulations resolved, polarization independent transmission. Whereas the needed submicron microstructure lends itself

Boyer, Edmond

359

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network (OSTI)

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

360

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network (OSTI)

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques ?lie Cartan, Université Henri Poincaré

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Virulence, parasite mode of transmission, and host fluctuating asymmetry  

Science Journals Connector (OSTI)

...they provide a potential route for vertical transmission (Hembree & Ryan 1982...the horizontalvertical transmission sequence. Dashed lines indicate the horizontal...aeg pti depends on the transmission route of its parasite Edha ardia...

1997-01-01T23:59:59.000Z

362

Introduction. Cultural transmission and the evolution of human behaviour  

Science Journals Connector (OSTI)

...some promising lines of development...learning|cultural transmission|cultural evolution...illustration of cultural transmission delivering improved...efficient over transmission events, in line with the notion...two different routes: repeated interaction...

2008-01-01T23:59:59.000Z

363

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

364

Geothermal/Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Transmission < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Transmission General Regulatory Roadmap NEPA (5) The Geysers power plant showing condensers being retrofitted with direct contact condensers (DCCs). The DCCs were designed by NREL researchers working with Calpine Corporation for improved efficiency. With a 750-megawatt output from 14 units, the Geysers is the largest producer of geothermal power in the world. Geothermal power plants are located very close to the geothermal resource because the hot water/steam would cool down before reaching the power plant, unlike a natural gas plant which pipe gas hundreds or even thousands

365

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

366

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel...

367

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes This article is a...

368

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

369

Transmission line modeling with explicit grounding representation  

Science Journals Connector (OSTI)

This paper presents a new model of an overhead transmission line for electromagnetic transient computations. The unique feature of the model is the explicit representation of the tower grounding configuration and terminal substation grounds. Other properties of the model are: (1) accurate frequency dependent parameter representation from DC to several MHz; (2) explicit modeling of line asymmetries; and (3) high numerical efficiency. The model implementation is based on the solution of the transmission line differential equations resulting in a set of step response functions, forming a matrix. The step response matrix is utilized in a time domain simulation of electric power networks by a linear convolution scheme. The transmission line model is validated with actual system test data. The model is useful for computing the ground potential rise of transmission towers due to lightning or switching surges, insulation stress, etc. Typical applications are described in the paper.

G.J. Cokkinides; A.P.Sakis Meliopoulos

1988-01-01T23:59:59.000Z

370

RAPID/Geothermal/Transmission Siting & Interconnection | Open...  

Open Energy Info (EERE)

in California California Energy Commission, California Energy Commission In California, transmission lines set to operate with a voltage between 50 kV and 200 kV must...

371

Transmission Policy in the United States  

E-Print Network (OSTI)

Market Design (SMD) proposal. PJMs market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERCs RTO and SMD visions....

Joskow, Paul

2006-03-14T23:59:59.000Z

372

National Electric Transmission Congestion Studies | Department...  

Energy Savers (EERE)

of the line or by operational directives that are created and enforced to protect the security and reliability of the grid. The term "transmission constraint" can refer to a...

373

National Electric Transmission Congestion Study- Portland Workshop  

Energy.gov (U.S. Department of Energy (DOE))

On December 13, 2011, DOE hosted a regional pre-study workshop in Portland, OR to receive input and suggestions concerning the National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below.

374

Executive Forum on Solutions to Transmission Investment  

E-Print Network (OSTI)

d'Hydro-Québec (IREQ) ISO New England Korea Electric Power Research Institute Michigan Electric. Business and Economics Small Groups ........................................................10 B. Planning and Transmission Investment Policy Small Groups ......................10 C. Technology Small Groups

375

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

Zip: 33408 Product: Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC line from West Texas to DallasFort...

376

Neuromotor Transmissibility of Horizontal Seatpan Vibration  

E-Print Network (OSTI)

Exposure to occupational whole body vibration (WBV) is associated with low back pain disorders, musculoskeletal disorders, and degeneration of spine. Transmission of vibration to the neuromotor system may play a role in the etiology...

Channamallu, Raghu Ram

2007-12-16T23:59:59.000Z

377

Data transmission element for downhole drilling components  

DOE Patents (OSTI)

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

378

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

379

Synthesis of Lumped Transmission-Line Analogs  

E-Print Network (OSTI)

Transmission lines and their lumped approximating networks have long been incorporated into radio-frequency power amplifiers to improve efficiency and shape circuit waveforms and are beginning to perform a similar roles ...

Phinney, Joshua W.

380

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

operate, maintain and decommission the TransWest Express 600-kV Direct Current Transmission Project. TransWest Express, LLC is a whollyowned subsidiary of the Anschutz...

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Electric Power Generation and Transmission (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

382

1 Introduction Danish transmission system operator  

E-Print Network (OSTI)

a new 400 kV transmission line between the cities Aarhus and Aalborg, app 90 km. This line at the 150 kV transmission level and intended to be used at 400 kV more than just for this line. Can of the dynamic behavior of a shunt reactor compensated 400 kV combined cable/overhead line. This is accomplished

Bak, Claus Leth

383

Building Energy Software Tools Directory: Degree Day .Net  

NLE Websites -- All DOE Office Websites (Extended Search)

Degree Day .Net Degree Day .Net Logo for Degree Day.net Website that generates heating and cooling degree days for locations worldwide. Degree days are commonly used in calculations relating to building energy consumption. Once you have chosen a weather station (of which there are thousands available) and specified the degree days you want (e.g. what base temperature, do you want them broken down in daily, weekly or monthly format), Degree Days.net will calculate your degree days, and give them to you as a CSV file that you can open directly in a spreadsheet. Screen Shots Keywords degree days, HDD, CDD Validation/Testing A comprehensive suite of automated tests have been written to test the software. Expertise Required Degree Days.net makes it very easy to specify and generate degree days, so

384

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

385

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

386

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

387

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

388

RAPID/BulkTransmission/General Construction | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionGeneral Construction < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit...

389

QER Public Meeting in New Orleans, LA: Petroleum Product Transmission...  

Energy Savers (EERE)

Orleans, LA: Petroleum Product Transmission & Distribution QER Public Meeting in New Orleans, LA: Petroleum Product Transmission & Distribution Meeting Date and Location: May 27,...

390

OAHU Wind Integration And Transmission Study: Summary Report...  

Office of Environmental Management (EM)

OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

391

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

392

In-situ Transmission Electron Microscopy and Spectroscopy Studies...  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Electron Microscopy and Spectroscopy Studies of Interfaces in Li-ion Batteries: Challenges and In-situ Transmission Electron Microscopy and Spectroscopy Studies of...

393

QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution Meeting Date and...

394

RAPID/BulkTransmission/Land Access | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us RAPID Bulk Transmission Land Access Regulatory...

395

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Energy.gov (U.S. Department of Energy (DOE))

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

396

2006 National Electric Transmission Congestion Study and Related...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion...

397

Draft National Electric Transmission Congestion Study Now Available...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft National Electric Transmission Congestion Study Now Available for Public Comment Draft National Electric Transmission Congestion Study Now Available for Public Comment August...

398

Plan to Conduct Electric Transmission Congestion Study: Federal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

399

RAPID/BulkTransmission/Siting/New Mexico | Open Energy Information  

Open Energy Info (EERE)

Solar Resources Contribute Contact Us RAPID Bulk Transmission Siting New Mexico Bulk Transmission Siting in New Mexico Regulatory Information Overviews Search for...

400

RAPID/BulkTransmission/Siting/California | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Resources Contribute Contact Us RAPID Bulk Transmission Siting California Bulk...

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Pipping of GH2 Pipeline....

402

RAPID/BulkTransmission/Air Quality | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionAir Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About...

403

California/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

do not have siting authority for transmission facilities. Print PDF Retrieved from "http:en.openei.orgwindex.php?titleCaliforniaTransmissionLocalRegulations&oldid68832...

404

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers (EERE)

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

405

RAPID/Overview/BulkTransmission/Siting/Colorado | Open Energy...  

Open Energy Info (EERE)

Colorado < RAPID | Overview | BulkTransmission | Siting(Redirected from RAPIDAtlasBulkTransmissionSitingColorado) Redirect page Jump to: navigation, search REDIRECT...

406

Transmission/Resource Library/Enviromental Resources and Mitigation...  

Open Energy Info (EERE)

Enviromental Resources and Mitigation < Transmission | Resource Library(Redirected from TransmissionResource LibraryMitigation) Redirect page Jump to: navigation, search...

407

Steps to Establish a Real-Time Transmission Monitoring System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that must be taken to establish a system to make available to all transmission owners and Regional Transmission Organizations (RTOs) within the Eastern and Western Interconnections...

408

QER Public Meeting in Portland, OR: Electricity Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Portland, OR: Electricity Transmission, Storage and Distribution - West QER Public Meeting in Portland, OR: Electricity Transmission, Storage and Distribution - West Meeting Date...

409

QER Public Meeting in Newark, NJ: Electricity Transmission and...  

Energy Savers (EERE)

Newark, NJ: Electricity Transmission and Distribution - East QER Public Meeting in Newark, NJ: Electricity Transmission and Distribution - East New Jersey Institute of Technology...

410

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

411

An Introduction to Electric Power Transmission | Open Energy...  

Open Energy Info (EERE)

An Introduction to Electric Power Transmission Abstract An introduction to transmission lines including topics: electricity generation and delivery, ownership and funding, anatomy...

412

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

413

Request for Information on Permitting of Transmission Lines:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

414

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy Savers (EERE)

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

415

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers (EERE)

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

416

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

417

EA-1982: Parker-Davis Transmission System Programmatic Operations...  

Energy Savers (EERE)

on Western's Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance...

418

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

419

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

420

RAPID/BulkTransmission/Water Quality | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionWater Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About...

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

RAPID/BulkTransmission/Water Use | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionWater Use < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk...

422

BPA, Transmission, I-5 Corridor Project, data by segments and...  

NLE Websites -- All DOE Office Websites (Extended Search)

alternatives for new transmission system facilities, including the new transmission line and substations proposed for the I-5 Corridor Reinforcement Project. Foremost is...

423

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

424

RAPID/BulkTransmission/Power Plant | Open Energy Information  

Open Energy Info (EERE)

BulkTransmissionPower Plant < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk...

425

An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.  

SciTech Connect

References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

Litzenberger, Wayne; Lava, Val

1994-08-01T23:59:59.000Z

426

Wireless electricity (Power) transmission using solar based power satellite technology  

Science Journals Connector (OSTI)

In the near future due to extensive use of energy, limited supply of resources and the pollution in environment from present resources e.g. (wood, coal, fossil fuel) etc, alternative sources of energy and new ways to generate energy which are efficient, cost effective and produce minimum losses are of great concern. Wireless electricity (Power) transmission (WET) has become a focal point as research point of view and nowadays lies at top 10 future hot burning technologies that are under research these days. In this paper, we present the concept of transmitting power wirelessly to reduce transmission and distribution losses. The wired distribution losses are 70 75% efficient. We cannot imagine the world without electric power which is efficient, cost effective and produce minimum losses is of great concern. This paper tells us the benefits of using WET technology specially by using Solar based Power satellites (SBPS) and also focuses that how we make electric system cost effective, optimized and well organized. Moreover, attempts are made to highlight future issues so as to index some emerging solutions.

M Maqsood; M Nauman Nasir

2013-01-01T23:59:59.000Z

427

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

428

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

Mills, Andrew D.

2009-01-01T23:59:59.000Z

429

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Planning (Xcel). 2006. Wind Integration Study Report OfTransmission Vision for Wind Integration. White Paper.Charles Smith (Utility Wind Integration Group), Lynn Coles (

Mills, Andrew D.

2009-01-01T23:59:59.000Z

430

Abstract --The need to determine adequate regulations in the transmission activity in deregulated environments does not  

E-Print Network (OSTI)

be followed. Index Terms--Transmission expansion, Transmission planning, Transmission systems, Transmission pricing, Open access. I INTRODUCTION he presence of economies of scale and the specificity

Dixon, Juan

431

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions- Dataset  

Energy.gov (U.S. Department of Energy (DOE))

Excel file with dataset for Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

432

Building Energy Software Tools Directory: Degree Day Forecasts  

NLE Websites -- All DOE Office Websites (Extended Search)

Forecasts Forecasts Degree Day Forecasts example chart Quick and easy web-based tool that provides free 14-day ahead degree day forecasts for 1,200 stations in the U.S. and Canada. Degree Day Forecasts charts show this year, last year and three-year average. Historical degree day charts and energy usage forecasts are available from the same site. Keywords degree days, historical weather, mean daily temperature Validation/Testing Degree day data provided by AccuWeather.com, updated daily at 0700. Expertise Required No special expertise required. Simple to use. Users Over 1,000 weekly users. Audience Anyone who needs degree day forecasts (next 14 days) for the U.S. and Canada. Input Select a weather station (1,200 available) and balance point temperature. Output Charts show (1) degree day (heating and cooling) forecasts for the next 14

433

Introduce a Girl to Engineering Day 2013 | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 Introduce a Girl to Engineering Day 2013 1 of 26 Introduce a Girl to Engineering Day 2013 Students at Argonne's 2013 Introduce a Girl to Engineering Day. At the event, middle-schoolers meet Argonne women scientists and engineers and do science experiments. For more information, visit Argonne's Educational Programs website. Introduce a Girl to Engineering Day 2013 1 of 26 Introduce a Girl to Engineering Day 2013 Students at Argonne's 2013 Introduce a Girl to Engineering Day. At the event, middle-schoolers meet Argonne women scientists and engineers and do science experiments. For more information, visit Argonne's Educational Programs website. Introduce a Girl to Engineering Day 2013 2 of 26 Introduce a Girl to Engineering Day 2013

434

National Day of Remembrance HSS Honors Former Nuclear Weapons Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Day of Remembrance HSS Honors Former Nuclear Weapons National Day of Remembrance HSS Honors Former Nuclear Weapons Program Workers National Day of Remembrance HSS Honors Former Nuclear Weapons Program Workers October 28, 2013 - 3:11pm Addthis Color Guard | National Day of Remembrance - October 25, 2013 Color Guard | National Day of Remembrance - October 25, 2013 US Representative Dina Titus (1st Congressional District of Nevada) | National Day of Remembrance - October 25, 2013 US Representative Dina Titus (1st Congressional District of Nevada) | National Day of Remembrance - October 25, 2013 Mr. Al Tseu | National Day of Remembrance - October 25, 2013 Mr. Al Tseu | National Day of Remembrance - October 25, 2013 Mr. Glenn Podonsky, Chief Health Safety and Security Officer | National Day of Remembrance - October 25, 2013

435

12 Days of Energy Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Days of Energy Savings 2 Days of Energy Savings 12 Days of Energy Savings December 24, 2012 - 9:30am Addthis Day 12: Drive Your Way to Fuel Savings 1 of 12 Day 12: Drive Your Way to Fuel Savings Save money on fuel costs by emptying your car after all your shopping trips -- an extra 100 pounds in your vehicle could increase gas costs by up to $.08 a gallon. Image: Sarah Gerrity, Energy Department Day 11: Plug Holiday Decorations into Power Strips 2 of 12 Day 11: Plug Holiday Decorations into Power Strips Stop phantom loads -- which cost Americans $100 a year on average -- by turning off power strips when you aren't using holiday decorations. Image: Sarah Gerrity, Energy Department Day 10: Install a Light Timer 3 of 12 Day 10: Install a Light Timer Keep in the holiday spirit while saving energy by using timer controls to

436

12 Days of Energy Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Days of Energy Savings 12 Days of Energy Savings 12 Days of Energy Savings Addthis Day 12: Drive Your Way to Fuel Savings 1 of 12 Day 12: Drive Your Way to Fuel Savings Save money on fuel costs by emptying your car after all your shopping trips -- an extra 100 pounds in your vehicle could increase gas costs by up to $.08 a gallon. Image: Sarah Gerrity, Energy Department Day 11: Plug Holiday Decorations into Power Strips 2 of 12 Day 11: Plug Holiday Decorations into Power Strips Stop phantom loads -- which cost Americans $100 a year on average -- by turning off power strips when you aren't using holiday decorations. Image: Sarah Gerrity, Energy Department Day 10: Install a Light Timer 3 of 12 Day 10: Install a Light Timer Keep in the holiday spirit while saving energy by using timer controls to

437

A FRAMEWORK FOR TRANSMISSION CONGESTION MANAGEMENT ANALYSIS MINGHAI LIU  

E-Print Network (OSTI)

markets introduces uncertainty in the LMPs and consequently, in transmission pricing. In order to protect

Gross, George

438

Colorado/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission < Colorado Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Colorado is part of the Western Interconnection power grid, which covers most of the western United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the

439

Wind Energy Transmission | Open Energy Information  

Open Energy Info (EERE)

Wind Energy Transmission Wind Energy Transmission Jump to: navigation, search Just a few years ago, 5% wind energy penetration in the United States was a lofty goal. In Europe, however, some countries have already reached wind energy penetrations of 10% or higher in a short period of time. The growth of domestic wind generation over the past decade has sharpened the focus on two questions: Can the electrical grid accommodate very high amounts of wind energy without jeopardizing security or degrading reliability? And, given that the nation's current transmission infrastructure is already constraining further development of wind generation in some regions, how could significantly larger amounts of wind energy be developed? The answers to these questions could hold the keys to determining how much of a role

440

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Idaho/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Idaho/Transmission < Idaho Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Idaho is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). It includes the provinces of Alberta and British Columbia, the northern portion of Baja California, Mexico, and all or portions of the 14 Western states between.

442

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 129 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled

443

2012 National Electric Transmission Congestion Study - Philadelphia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops.pdf 12-06-11 Congestion Workshop Agenda - Philadelphia (final).pdf Introduction by David Meyer, DOE.pdf Presentation by Edward Finley, NCUC.pdf Presentation by Betty Ann Kane, DC PSC.pdf Presentation by Robert Bradish, American Electric Power.pdf Presentation by John Buechler, NYISO.pdf Presentation by Jim Busbin, Southern Company.pdf

444

Arizona/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Arizona/Transmission < Arizona Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Arizona is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including Arizona. WECC

445

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

This This page inTenTionally lefT blank 127 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the

446

Washington/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Washington/Transmission < Washington Jump to: navigation, search WashingtonTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Washington is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC's service territory extends from Canada to Mexico. It includes the provinces of Alberta and British Columbia, the northern portion of Baja California,

447

Montana/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Montana/Transmission < Montana Jump to: navigation, search MontanaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Montana is part of both the Eastern and Western Interconnection power grids and is part of two NERC regions - the Midwest Reliability Organization (MRO) and Western Electricity Coordinating Council (WECC). MRO's service territory extends from the state of Nebraska north to

448

Transmission Infrastructure: FERCs Role  

U.S. Energy Information Administration (EIA) Indexed Site

Transmission Incentives Transmission Incentives Transmission Incentives P. Kumar Agarwal P. Kumar Agarwal Acting Director, Division of Reliability & Acting Director, Division of Reliability & Engineering Services Engineering Services Federal Energy Regulatory Commission Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration U.S. DOE, Energy Information Administration 2009 Energy Conference 2009 Energy Conference Washington, DC Washington, DC April 7, 2009 April 7, 2009 2 2 History History   Energy Policy Act of 2005, August 5, Energy Policy Act of 2005, August 5, 2005 2005 - - Created FPA Section 219 Created FPA Section 219   FERC issued order No. 679 on July 20, FERC issued order No. 679 on July 20, 2006 adopting regulations to promote 2006 adopting regulations to promote

449

Downhole transmission system comprising a coaxial capacitor  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Johnson, Monte L. (Orem, UT); Bartholomew, David B. (Springville, UT); Hall, Jr., H. Tracy (Provo, UT); Rawle, Michael (Springville, UT)

2011-05-24T23:59:59.000Z

450

Data transmission system with distributed microprocessors  

DOE Patents (OSTI)

A data transmission system having a common request line and a special request line in addition to a transmission line. The special request line has priority over the common request line. A plurality of node stations are multi-drop connected to the transmission line. Among the node stations, a supervising station is connected to the special request line and takes precedence over other slave stations to become a master station. The master station collects data from the slave stations. The station connected to the common request line can assign a master control function to any station requesting to be assigned the master control function within a short period of time. Each station has an auto response control circuit. The master station automatically collects data by the auto response controlling circuit independently of the microprocessors of the slave stations.

Nambu, Shigeo (Fuchu, JP)

1985-01-01T23:59:59.000Z

451

A transmission calibration method for superconducting resonators  

E-Print Network (OSTI)

A method is proposed and experimentally explored for \\textit{in-situ} calibration of complex transmission data for superconducting microwave resonators. This cryogenic calibration method accounts for the instrumental transmission response between the vector network analyzer reference plane and the device calibration plane. Once calibrated, the observed resonator response was modeled in detail by two approaches. The first, a phenomenological model based on physically realizable rational functions, enables the extraction of multiple resonance frequencies and widths for coupled resonators without explicit specification of the circuit network. In the second, an ABCD-matrix representation for the distributed transmission line circuit is used to model the observed response from the characteristic impedance and propagation constant. When used in conjunction with electromagnetic simulations, the kinetic inductance fraction can be determined with this method with an accuracy of 2%. Datasets for superconducting microst...

Cataldo, Giuseppe; Barrentine, Emily M; Brown, Ari D; Moseley, Samuel H; U-Yen, Kongpop

2014-01-01T23:59:59.000Z

452

Single transmission line data acquisition system  

DOE Patents (OSTI)

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

453

Transmission/Nepa Database | Open Energy Information  

Open Energy Info (EERE)

Nepa Database Nepa Database < Transmission Jump to: navigation, search NepaHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Document Collections (1) Have a NEPA Document Collection to add that doesn't yet exist in this collection? Make sure it doesn't already exist: Please be sure to search this page by serial number and by document number Add.png Add a new NEPA Document Collection This query has been included to allow you to use the black arrows in the table header cells to sort the table data. Document Name Serial Number Analysis Type Transmission Type Project Area Applicant Lead Agency District Office Project Phase(s) TransWest EIS 600kV Wyoming Western Power Administration BLM BLM Wyoming State Office

454

Oregon/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Oregon/Transmission < Oregon Jump to: navigation, search OregonTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Idaho is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC's service territory extends from Canada to Mexico. It includes the provinces of Alberta and British Columbia, the northern portion of Baja California,

455

Utah/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Utah/Transmission < Utah Jump to: navigation, search UtahTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Utah is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC includes the provinces of Alberta and British Columbia, the northern portion of Baja California, Mexico, and all or portions of the 14 Western states between.

456

Nevada/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Nevada/Transmission < Nevada Jump to: navigation, search NevadaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Nevada is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in Nevada.

457

Definition: Advanced Transmission Applications | Open Energy Information  

Open Energy Info (EERE)

Applications Applications Jump to: navigation, search Dictionary.png Advanced Transmission Applications Software that utilizes synchrophasor information for real-time grid operations or planning and off-line analysis. These applications are aimed at providing wide-area situational awareness, grid monitoring, and detailed power system analysis and the improvement or validation of power system models.[1] Related Terms smart grid References ↑ https://www.smartgrid.gov/category/technology/advanced_transmission_applications [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssustainability, |Template:BASEPAGENAME]]sustainability, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Advanced_Transmission_Applications&oldid=502495

458

EIS-0285: Transmission System Vegetation Management Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 20, 2003 February 20, 2003 EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program February 19, 2003 EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-125: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-124: Supplement Analysis Transmission System Vegetation Management Program February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 16, 2003 EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program December 24, 2002

459

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Transmission_Company_LLC_Smart_Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

460

EIS-0285: Transmission System Vegetation Management Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 19, 2002 July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 9, 2002 EIS-0285-SA-81: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-80: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-78: Supplement Analysis Transmission System Vegetation Management Program June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

462

Electric Transmission Lines (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

463

Synchronized Andreev transmission in SNS junction arrays.  

SciTech Connect

We construct a nonequilibrium theory for the charge transfer through a diffusive array of alternating normal (N) and superconducting (S) islands comprising an SNSNS junction, with the size of the central S island being smaller than the energy relaxation length. We demonstrate that in the nonequilibrium regime the central island acts as Andreev retransmitter with the Andreev conversions at both NS interfaces of the central island correlated via above-the-gap transmission and Andreev reflection. This results in a synchronized transmission at certain resonant voltages which in experiments is seen as a sequence of spikes in the differential conductivity.

Chtchelkatchev, N. M.; Baturina, T. I.; Glatz, A.; Vinokur, V. M.; Materials Science Division; Russian Academy of Sciences; Moscow Inst. of Physics and Technology; Inst. Semiconductor Physics

2010-07-29T23:59:59.000Z

464

Optimizing Storages for Transmission System Operation  

Science Journals Connector (OSTI)

Abstract A growing amount of congestions is expected for future operation of electrical transmission grids in Europe. Within this context, storages can be used to assist transmission system operators in daily operation and to avoid costly redispatch measures. In this paper, a research methodology to evaluate impact and interdependencies between market operation of storages and participation in redispatch measures is presented. Furthermore, a methodology for the evaluation of benefits by storages solely administrated by TSO is introduced. The methods are evaluated in a case study for the German electricity system in the year 2020.

Jonas Eickmann; Tim Drees; Jens D. Sprey; Albert Moser

2014-01-01T23:59:59.000Z

465

EC Transmission Line Risk Identification and Analysis  

SciTech Connect

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

466

Museum Day at Bradbury Science Museum Sept. 24  

NLE Websites -- All DOE Office Websites (Extended Search)

Museum Day at Bradbury Science Museum Museum Day at Bradbury Science Museum Museum Day at Bradbury Science Museum Sept. 24 Participating museums and cultural institutions across the nation open their doors free of charge to anyone presenting a Smithsonian magazine Museum Day ticket. September 19, 2011 Bradbury Science Museum Bradbury Science Museum Contact Steve Sandoval Communicatons Office (505) 665-9206 Email LOS ALAMOS, New Mexico, September 19, 2011-Los Alamos National Laboratory's Bradbury Science Museum is participating for the third year in the seventh Smithsonian magazine's Museum Day on Saturday, September 24. Sponsored by Smithsonian Media, Museum Day is a day when participating museums and cultural institutions across the nation open their doors free of charge to anyone presenting a Smithsonian magazine Museum Day ticket.

467

Video: Secretary Moniz Loosens Up For Earth Day Pitch | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Video: Secretary Moniz Loosens Up For Earth Day Pitch Video: Secretary Moniz Loosens Up For Earth Day Pitch April 21, 2014 - 4:11pm Addthis After work one night last week,...

468

DOE Headquarters Earth Day 2014 | Department of Energy  

Office of Environmental Management (EM)

DOE Headquarters Earth Day 2014 DOE Headquarters Earth Day 2014 earthday2011lg.png Save the Date - April 22, 2014 April 22, 2014, is the 44th anniversary of the founding of Earth...

469

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

nearest transmission system substation, and are derived fromthe nearest transmission substation, the capacity factor of

Mills, Andrew D

2011-01-01T23:59:59.000Z

470

Transmission grid access and pricing in Norway, Spain, and California: A comparative study  

E-Print Network (OSTI)

incentives given by transmission pricing form the foundationhas focussed on transmission pricing, monopoly regulation,

Gronli, Helle; Gomez San Ramon, Tomas; Marnay, Chris

1999-01-01T23:59:59.000Z

471

Day 1 at 2014 ARPA-E Innovation Summit  

Energy.gov (U.S. Department of Energy (DOE))

Knowledge and networking were key themes during the first day of ARPA-E's Energy Innovation Summit. Learn more.

472

Innovative Manufacturing Initiative Recognition Day- Final Participant Listing  

Energy.gov (U.S. Department of Energy (DOE))

Participant listing for Innovative Manufacturing Initiative Recognition Day held in Washington, D.C. on June 20, 2012

473

Processing Transactions that have Exceeded the 90-day Guideline  

E-Print Network (OSTI)

journal. It appears when correcting a journal that posted over 90-days ago or when recording a sale more than 90 days after the actual date of sale. Step 1: Access the 90-day form When a 90-day form to ASRSP at (847) 467-2557 in EV or (312) 503-0873 in CH. If you do not have a fax machine, you may send

Shull, Kenneth R.

474

SPIDERS Joint Capability Technology Demonstration Industry Day Presentations  

Energy.gov (U.S. Department of Energy (DOE))

Presentations from the SPIDERS Joint Capability Technology Demonstration Industry Day, which occurred on April 22, 2014, at Fort Carson, Colorado.

475

Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator  

Energy.gov (U.S. Department of Energy (DOE))

Supplemental comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission...

476

A neutron transmission study of environmental Gd  

E-Print Network (OSTI)

A new method for the determination of environmental Gd by neutron transmission (NT) experiments is proposed. The NT method is based on the measurements of neutron spectra passing through a target. From the attenuation neutron spectra new data as concentration, width, resonance energies and cross section have been obtained.

Cristiana Oprea; Ioan Alexandru Oprea; Alexandru Mihul

2014-06-02T23:59:59.000Z

477

How Financial Transmission Rights Curb Market Power  

E-Print Network (OSTI)

PWP-049 How Financial Transmission Rights Curb Market Power Steven Stoft June 1997 This paper is part of the working papers series of the Program on Workable Energy Regulation (POWER). POWER is a program of the University of California Energy Institute, a multicampus research unit of the University

California at Berkeley. University of

478

Methods and systems for micro transmissions  

DOE Patents (OSTI)

Methods and systems for micro transmissions for a micro machine may comprise an input shaft assembly coupled to a micro actuator, an output shaft assembly coupled to a micro shaft, and one or more power conversion elements operable to convert a first type of movement from the micro actuator into a second, disparate type of movement for the micro shaft.

Stalford, Harold L

2014-12-23T23:59:59.000Z

479

Transmission line environmental assessment guidance document  

SciTech Connect

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

480

Efficient Spectral Methods for Transmission Eigenvalues and ...  

E-Print Network (OSTI)

Mar 20, 2014 ... scattering obstacle can be recovered by using the measured scattering data and the ... method reduces the problem to a sequence of one-dimensional transmission eigenvalue ...... Next, we define the following interface basis functions ... problem can be efficiently solved by using a standard procedure [10].

2014-03-24T23:59:59.000Z

Note: This page contains sample records for the topic "mcnary-john day transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

A numerical tool for transmission lines  

Science Journals Connector (OSTI)

The electric line numerical study is usually made through a harmonic approach with the impedance concept based on the Finite Difference discretization in both the time and space domains. These methods present severe drawbacks when used in impulse working ... Keywords: differential system, finite element method, impulse voltage, stiff time problem, transmission line

Herv Bolvin; Andr Chambarel; Philippe Neveux

2005-05-01T23:59:59.000Z

482

1 Introduction Danish transmission system operator  

E-Print Network (OSTI)

400 kV transmission line between the cities Aarhus and Aalborg, app. 90 km. This line is constructed reactor compensated 400 kV combined cable/overhead line. This is accomplished by means of theoretical-phase autoreclosure ARC in such a combined cable/OHL line. Keywords -- 400 kV cable, single-phase autoreclosure, shunt

Bak, Claus Leth

483

HVDC transmission: a path to the future?  

SciTech Connect

Direct current transmission has been the poor stepchild of the U.S. electric industry. Although early-generation plants were based on DC technology, it was soon deemed uneconomical to transmit electricity over long distances, but it now appears poised for a change. Both the increasing technical potential and changing economics of HVDC lines promise a growing role in the future. (author)

Teichler, Stephen L.; Levitine, Ilia

2010-05-15T23:59:59.000Z

484

GATOR FOR A DAY AMBASSADOR APPLICATION FALL 2013 AMBASSADOR CLASS  

E-Print Network (OSTI)

GATOR FOR A DAY AMBASSADOR APPLICATION FALL 2013 AMBASSADOR CLASS Please return this form-campus? _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ What skills do you have that you believe will be an asset to the Gator for a Day Ambassador Program? _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ Please select three times you are available for your Gator for a Day Ambassador interview. You

Mazzotti, Frank

485

Definition: Transmission Angle and Frequency Monitoring | Open Energy  

Open Energy Info (EERE)

Transmission Angle and Frequency Monitoring Transmission Angle and Frequency Monitoring Jump to: navigation, search Dictionary.png Transmission Angle and Frequency Monitoring An advanced transmission application that uses angle and frequency measurements from PMUs to indicate loss of generation or other disturbances causing a change in the supply/demand balance.[1] Related Terms transmission lines, advanced transmission applications, transmission line References ↑ https://www.smartgrid.gov/category/technology/transmission_angle_and_frequency_monitoring [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like. egory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Angle_and_Frequency_Monitoring&oldid=502506

486

2006 National Electric Transmission Congestion Study and Related Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study and Related 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric Transmission Corridors were designated in 2007. They were invalidated by a federal appeals court in 2011. Comments and form letters were submitted by the public in response to this study. National Electric Transmission Congestion Study 2006 Executive Summary Full Text of the National Electric Transmission Congestion Study 2006

487

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

488

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

489

14UO TANK,OPENING REPORT NO.5. October 20th -November 26th (37 days total; 27 working days).  

E-Print Network (OSTI)

14UO TANK,OPENING REPORT NO.5. October 20th - November 26th (37 days total; 27 working days). Since the tank was last closed the accelerator ran for 97 days.until this opening which was scheduled to replace was done during the tank-open period. We believe that there would be value in gIvIng our assessments

Chen, Ying

490

How Are You Celebrating Earth Day? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Are You Celebrating Earth Day? Are You Celebrating Earth Day? How Are You Celebrating Earth Day? April 22, 2010 - 7:30am Addthis Happy Earth Day! Today marks the 40th anniversary of celebrating Earth Day, and we hope you're getting into the spirit and committing to protecting the environment and saving energy. Check out EERE's Earth Day Web site and interactive animation for some great ideas and information to get you started. How are you celebrating Earth Day? Once you've shared your answer here, check out our guest post in today's GovGab! Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. Please comment with your answers, and also feel free to respond to other comments. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov

491

annual average heating degree days | OpenEI  

Open Energy Info (EERE)

average heating degree days average heating degree days Dataset Summary Description (Abstract): Heating Degree Days below 18° C (degree days)The monthly accumulation of degrees when the daily mean temperature is below 18° C.NASA Surface meteorology and Solar Energy (SSE) Release 6.0 Data Set (Nov 2007)22-year Monthly Average & Annual Sum (July 1983 - June 2005)Parameter: Heating Degree Days Below 18 degrees C (degree days)Internet: http://eosweb.larc.nasa.gov/sse/ Source U.S. National Aeronautics and Space Administration (NASA), Surface meteorology and Solar Energy (SSE) Date Released March 31st, 2009 (5 years ago) Date Updated April 01st, 2009 (5 years ago) Keywords annual average heating degree days climate GIS NASA SWERA UNEP Data application/zip icon Download Shapefile (zip, 2.7 MiB)

492

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

493

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

494

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

of incremental wind development. At the extreme, still otherextreme assumption, the implied unit cost of transmission for windon wind power in their analysis. On one extreme, a number of

Mills, Andrew D.

2009-01-01T23:59:59.000Z

495

Colorado/Transmission/Regulatory Overview | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Regulatory Overview < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Overview Roadmap State Data Regulatory Overview General Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution.

496

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

497

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

498

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations. The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). DOE Affirms National Interest Electric Transmission Corridor Designations More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest

499

High Resolution Transmission Spectroscopy as a Diagnostic for Jovian Exoplanet Atmospheres: Constraints from Theoretical Models  

E-Print Network (OSTI)

We present high resolution transmission spectra of giant planet atmospheres from a coupled 3-D atmospheric dynamics and transmission spectrum model that includes Doppler shifts which arise from winds and planetary motion. We model jovian planets covering more than two orders of magnitude in incident flux, corresponding to planets with 0.9 to 55 day orbital periods around solar-type stars. The results of our 3-D dynamical models reveal certain aspects of high resolution transmission spectra that are not present in simple 1-D models. We find that the hottest planets experience strong substellar to anti-stellar (SSAS) winds, resulting in transmission spectra with net blue shifts of up to 3 km s$^{-1}$, whereas less irradiated planets show almost no net Doppler shifts. Compared to 1-D models, peak line strengths are significantly reduced for the hottest atmospheres owing to Doppler broadening from a combination of rotation (which is faster for close-in planets under the assumption of tidal locking) and atmospheri...

Kempton, Eliza M -R; Heng, Kevin

2014-01-01T23:59:59.000Z

500

NREL: Transmission Grid Integration - Data and Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Data and Resources Data and Resources NREL offers the following transmission integration-related data and resources. Eastern Wind Dataset A key task of the Eastern Wind Integration and Transmission Study was to develop a dataset of three years of modeled time series wind speed and power. This dataset was designed to help energy professionals perform wind integration studies, compare potential wind sites spatially and temporally, and estimate power production from hypothetical wind plants. Western Wind Dataset A primary task of the Western Wind and Solar Integration Study was to produce a comprehensive dataset that could be used to model the build-out of potential wind plants in the Western United States. This dataset was designed to help energy professionals perform wind integration studies,