Powered by Deep Web Technologies
Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

EA-1262: McKay Bypass Canal Extension, Golden, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposal to extend the McKay Bypass Canal in order to route water from the existing Canal north of the Walnut Creek drainage on the east side of...

2

McKay Bay Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

McKay Bay Facility Biomass Facility McKay Bay Facility Biomass Facility Jump to: navigation, search Name McKay Bay Facility Biomass Facility Facility McKay Bay Facility Sector Biomass Facility Type Municipal Solid Waste Location Hillsborough County, Florida Coordinates 27.9903597°, -82.3017728° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.9903597,"lon":-82.3017728,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

3

Making Biofuel Renewable: Sustainable Phosphorus Recovery from Microbial Biomass McKay Gifford and Paul Westerhoff  

E-Print Network (OSTI)

Making Biofuel Renewable: Sustainable Phosphorus Recovery from Microbial Biomass McKay Gifford, BioresourceTechnology, 102(2), 1697-1703. Biomass Composition Biofuel Processing Anion Exchange Microwave depletion indicate that future energy must come from biofuel. Biodiesel from photosynthetic microorganisms

Hall, Sharon J.

4

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1001 - 21010 of 28,905 results. 1001 - 21010 of 28,905 results. Download Framework for Implementing DOE Order 144.1 Ensures consistent interpretation and application of the DOE Indian Policy and its principles when dealing with affected tribes. http://energy.gov/em/downloads/framework-implementing-doe-order-1441 Page EA-1262: McKay Bypass Canal Extension, Golden, Colorado This EA evaluates the environmental impacts for the proposal to extend the McKay Bypass Canal in order to route water from the existing Canal north of the Walnut Creek drainage on the east side of... http://energy.gov/nepa/ea-1262-mckay-bypass-canal-extension-golden-colorado-0 Page EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project This EIS assesses the potential programmatic impacts of conducting the

5

CO2 Emissions - Panama Canal Zone  

NLE Websites -- All DOE Office Websites (Extended Search)

Panama Canal Zone Graphics CO2 Emissions from Panama Canal Zone Data graphic Data CO2 Emissions from Panama Canal Zone...

6

Advanced Vehicle Testing Activity: Oil Bypass Filter  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil Bypass Filter to someone by E-mail Share Advanced Vehicle Testing Activity: Oil Bypass Filter on Facebook Tweet about Advanced Vehicle Testing Activity: Oil Bypass Filter on...

7

Advanced Vehicle Testing Activity: Oil Bypass Filter  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil Bypass Filter The Idaho National Laboratory (INL) is evaluating oil bypass filter technology for the U.S. Department of Energy's (DOE's) Vehicle Technologies Office. Eight...

8

The Illinois and Michigan Canal  

NLE Websites -- All DOE Office Websites (Extended Search)

canal, 96 miles long from Bridgeport (just east of Ashland Ave. at about 28th St.) to Peru-LaSalle, was completed and opened for traffic in 1848. The first boat to pass thru the...

9

By-pass valve  

Science Conference Proceedings (OSTI)

An improved by-pass valve (1) for use in an automobile exhaust system (Es) comprises an air inlet (7) connected to an air pump (Ap), first and second air outlets (15,23) respectively connected to first and second portions (P1,p2) of a catalytic converter (Cc) and a third outlet (33) through which air is dumped to atmosphere. Air is directed from the inlet to the first outlet when engine temperature is less than a predetermined value and from the inlet to the second outlet when engine temperature reaches the predetermined value. A first and normally closed valve (81) is intermediate the air inlet and the first and second outlets and a second and normally open valve (83) is intermediate the air inlet and the third outlet. The first valve is opened and the second valve closed when engine vacuum exceeds a predetermined level so air flows to either the first or second outlet. The second valve is reopened whenever the outlet to which air is directed is blocked so air is dumped to atmosphere. To accomplish this, the first valve is mounted on the first section (111) of a split shaft (109) and the second valve is mounted on a second shaft section (113). The sections are movable in unison to open the first valve, but the second section is movable relative to the first section when a blockage occurs to reopen the second valve.

Williamson, R.E.

1981-01-06T23:59:59.000Z

10

Algae control for hydrogeneration canals  

DOE Green Energy (OSTI)

The purpose of this Cooperative Research and Development Agreement (CRADA) was to assess and develop control practices for nuisance algae growth in power canal that delivers water to hydro-generation facilities. This growth results in expenditures related not only to lost generation but also labor and materials costs associated with implementing remediation procedures. On an industry-wide basis these costs associated with nuisance algal growth are estimated to be several million dollars per year.

Grahovac, P.

1997-02-16T23:59:59.000Z

11

EA-1262-FEA-1998.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT McKay Bypass Canal Extension U.S. Department of Energy Rocky Flats Field Office Golden, Colorado September 1998 i TABLE OF CONTENTS 1.0 INTRODUCTION.................................................................................................................... 1 1.1 Background............................................................................................................................... 1 1.2 Purpose and Need..................................................................................................................... 1 2.0 DESCRIPTION OF ALTERNATIVES .................................................................................. 2 2.1 Proposed Action - Buried Pipeline...........................................................................................

12

Oil Bypass Filter Technology Evaluation - Fourth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

ABSTRACT This fourth Oil Bypass Filter Technology Evaluation report details the ongoing fleet evaluation of an oil bypass filter technology by the Idaho National Engineering and...

13

Advanced Vehicle Testing Activity - Oil Bypass Filtration Evaluation  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil Bypass Filtration Evaluation These reports detail the ongoing fleet evaluation of oil bypass filter technologies by the Idaho National Laboratory (INL) for the U. S. Department...

14

NPP Boreal Forest: Canal Flats, Canada  

NLE Websites -- All DOE Office Websites (Extended Search)

Canal Flats, Canada, 1984 Canal Flats, Canada, 1984 Data Citation Cite this data set as follows: Comeau, P. G., and J. P. Kimmins. 1999. NPP Boreal Forest: Canal Flats, Canada, 1984. Data set. Available on-line [http://www.daac.ornl.gov] from Oak Ridge National Laboratory Distributed Active Archive Center, Oak Ridge, Tennessee, U.S.A. Description Above and below-ground biomass and productivity of four lodgepole pine stands (Pinus contorta var. latifolia) were determined near Canal Flats, Canada, during the 1984 growing season. Two stands growing on xeric sites and two stands growing on mesic sites were studied to determine the influence of soil water content on resource allocation to above-ground versus below-ground plant components. The stands were 70-78 years old, unmanaged, and had regenerated naturally following wildfire.

15

Exhaust gas bypass valve control for thermoelectric generator  

DOE Patents (OSTI)

A method of controlling engine exhaust flow through at least one of an exhaust bypass and a thermoelectric device via a bypass valve is provided. The method includes: determining a mass flow of exhaust exiting an engine; determining a desired exhaust pressure based on the mass flow of exhaust; comparing the desired exhaust pressure to a determined exhaust pressure; and determining a bypass valve control value based on the comparing, wherein the bypass valve control value is used to control the bypass valve.

Reynolds, Michael G; Yang, Jihui; Meisner, Greogry P.; Stabler, Francis R.; De Bock, Hendrik Pieter (Peter) Jacobus; Anderson, Todd Alan

2012-09-04T23:59:59.000Z

16

Bypass diode for a solar cell  

SciTech Connect

Bypass diodes for solar cells are described. In one embodiment, a bypass diode for a solar cell includes a substrate of the solar cell. A first conductive region is disposed above the substrate, the first conductive region of a first conductivity type. A second conductive region is disposed on the first conductive region, the second conductive region of a second conductivity type opposite the first conductivity type.

Rim, Seung Bum (Palo Alto, CA); Kim, Taeseok (San Jose, CA); Smith, David D. (Campbell, CA); Cousins, Peter J. (Menlo Park, CA)

2012-03-13T23:59:59.000Z

17

Turbine protection system for bypass operation  

SciTech Connect

In a steam turbine installation having a high pressure turbine, a steam generator is described for providing steam to the turbine, at least a lower pressure turbine, a reheater in the steam path between the high and lower pressure turbines, and a steam bypass path for bypassing the turbines, the high pressure turbine having a one-way check valve in its output steam line to prevent bypass steam from entering its output. The improvement described here consists of: (A) a second bypass path for passing steam around the high pressure turbine; (B) the second bypass path including, (i) steam jet compressor means including two input sections and an output section, with one input section being connected to the high pressure turbine output, the other input section being connected to receive steam from the steam generator and the output section being connected to the input of the reheater, (ii) valving means for controlling the steam supply from the steam generator to the steam jet compressor means; and (C) control means responsive to an output condition at the high pressure turbine output for controlling the valving means.

Silvestri, G.J. Jr.

1986-03-18T23:59:59.000Z

18

PURADYN Oil Bypass Filtration System Evaluation Test Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

& Infrastructure Department PURADYN OIL BYPASS FILTRATION SYSTEM EVALUATION TEST PLAN October 2002 Reviewed: INEEL Fleet Maintenance Supervisor (Thomas) Date Reviewed:...

19

Bypass apparatus and method for series connected energy storage devices  

DOE Patents (OSTI)

A bypass apparatus and method for series connected energy storage devices. Each of the energy storage devices coupled to a common series connection has an associated bypass unit connected thereto in parallel. A current bypass unit includes a sensor which is coupled in parallel with an associated energy storage device or cell and senses an energy parameter indicative of an energy state of the cell, such as cell voltage. A bypass switch is coupled in parallel with the energy storage cell and operable between a non-activated state and an activated state. The bypass switch, when in the non-activated state, is substantially non-conductive with respect to current passing through the energy storage cell and, when in the activated state, provides a bypass current path for passing current to the series connection so as to bypass the associated cell. A controller controls activation of the bypass switch in response to the voltage of the cell deviating from a pre-established voltage setpoint. The controller may be included within the bypass unit or be disposed on a control platform external to the bypass unit. The bypass switch may, when activated, establish a permanent or a temporary bypass current path.

Rouillard, Jean (Saint-Luc, CA); Comte, Christophe (Montreal, CA); Daigle, Dominik (St-Hyacinthe, CA)

2000-01-01T23:59:59.000Z

20

Evaluation of Juvenile Fish Bypass and Adult Fish Passage Facilities at Three-Mile Falls Dam; Umatilla River, Oregon, 1989 Annual Report.  

DOE Green Energy (OSTI)

We report on our progress from October 1989 through September 1990 on evaluating juvenile fish bypass and adult fish passage facilities at Three Mile Falls Dam on the Umatilla River. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). Study objectives addressed by ODFW and CTUIR are: (1) ODFW (Report A): Operate and evaluate the juvenile fish bypass system in the West Extension Irrigation District canal at Three Mile Falls Dam; and (2) CTUIR (Report 8): Examine the passage of adult salmonids at Three Mile Falls Dam. The study is part of a program to rehabilitate anadromous fish stocks in the Umatilla River Basin that includes restorations of coho salmon Oncorhynchus Wsutch and chinook salmon 0. tshawytscha and enhancement of summer steelhead 0. mytiss.

Nigro, Anthony A.

1990-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Hoover Dam Bypass Project Phase II  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EA-1478 DOE/EA-1478 ENVIRONMENTAL ASSESSMENT Western' s Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead #5 and #7 230-kV Transmission Lines with the Henderson-Mead #1 230-kV Transmission Line, Clark County, Nevada) Prepared for: U.S. Department of Energy Western Area Power Administration 615 S. 43 rd Avenue Phoenix, Arizona 85009 Prepared by: Transcon Environmental 3740 East Southern Avenue, Suite 218 Mesa, Arizona 85206 (480) 807-0095 October 2003 Western Area Power Administration Hoover Dam Bypass Project Phase II page i Environmental Assessment TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................................1 1.1 Background..................................................................................................................................1

22

Oil Bypass filter technology evaluation final report  

NLE Websites -- All DOE Office Websites (Extended Search)

6-01355 6-01355 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Final Report TECHNICAL REPORT Larry Zirker James Francfort Jordan Fielding March 2006 Idaho National Laboratory Operated by Battelle Energy Alliance INL/EXT-06-01355 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Final Report Larry Zirker James Francfort Jordan Fielding March 2006 Idaho National Laboratory Transportation Technology Department Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Assistant Secretary for Energy Efficiency and Renewable Energy Under DOE Idaho Operations Office Contract DE-AC07-05ID14517

23

Stima del canale in sistemi di trasmissione OFDM.  

E-Print Network (OSTI)

??Obiettivo di questa tesi è fornire dei risultati quantitativi per la discriminazione delle tecniche di stima del canale nelle trasmissioni OFDM. Il modello utilizzato per… (more)

Bonanno, Giovanni

2012-01-01T23:59:59.000Z

24

U-246: Tigase XMPP Dialback Protection Bypass Vulnerability | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Tigase XMPP Dialback Protection Bypass Vulnerability 6: Tigase XMPP Dialback Protection Bypass Vulnerability U-246: Tigase XMPP Dialback Protection Bypass Vulnerability August 28, 2012 - 7:00am Addthis PROBLEM: Tigase XMPP Dialback Protection Bypass Vulnerability PLATFORM: Tigase 5.x ABSTRACT: A vulnerability has been reported in Tigase, which can be exploited by malicious people to bypass certain security restrictions. reference LINKS: XMPP Standards Foundation Secunia Advisory SA50362 tigase.org CVE-2012-4670 IMPACT ASSESSMENT: Medium Discussion: The vulnerability is caused due to an error within the XMPP protocol implementation, which does not properly verify the "Verify Response" and "Authorization Response" messages. This can be exploited to spoof a domain and bypass the Dialback protection.

25

FACTORS AFFECTING RURAL KENTUCKY PATIENTS HOSPITAL CHOICE AND BYPASS BEHAVIOR.  

E-Print Network (OSTI)

??This study examines the underutilization of rural hospitals in Kentucky. The authors study hospital and patient characteristics to determine why and how rural patients bypass… (more)

He, Xiao

2011-01-01T23:59:59.000Z

26

Advanced Vehicle Testing Activity: Oil Bypass Filter Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Reports to someone by E-mail Share Advanced Vehicle Testing Activity: Oil Bypass Filter Testing Reports on Facebook Tweet about Advanced Vehicle Testing Activity: Oil...

27

Oil Bypass Filter Technology Evaluation - Second Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-03-00620 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Evaluation Second Quarterly Report January - March 2003 Larry Zirker...

28

Oil Bypass Filter Technology Evaluation - Fifth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-04-01618 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Fifth Quarterly Report October - December 2003...

29

Oil Bypass Filter Technology Evaluation - Eighth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-04-02486 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Eighth Quarterly Report July-September 2004...

30

Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy FreedomCAR & Vehicle Technologies Program Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology on Heavy and Light Vehicles James Francfort (PI) Timothy...

31

Oil Bypass Filter Technology Performance Evaluation - First Quarterly...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-03-00129 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Performance Evaluation First Quarterly Report Larry Zirker James...

32

Oil Bypass Filter Technology Evaluation - Sixth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-04-02004 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Sixth Quarterly Report January - March 2004...

33

Advanced Vehicle Testing Activity: Oil Bypass Filter Specifications...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Test Procedures to someone by E-mail Share Advanced Vehicle Testing Activity: Oil Bypass Filter Specifications and Test Procedures on Facebook Tweet about Advanced...

34

V-237: TYPO3 Security Bypass Vulnerabilities | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

SA54717 Security Focus ID 62257 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Some errors when handling file actions can be exploited to bypass file action permission restrictions and...

35

V-162: Apache Struts "ParameterInterceptor" Security Bypass Vulnerabil...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

arbitrary methods, bypassing Struts and OGNL library protections. 2. Any unsanitized String variable exposed by an action and have it evaluated as an OGNL expression to enable...

36

Heat exchanger bypass system for an absorption refrigeration system  

DOE Patents (OSTI)

A heat exchanger bypass system for an absorption refrigeration system is disclosed. The bypass system operates to pass strong solution from the generator around the heat exchanger to the absorber of the absorption refrigeration system when strong solution builds up in the generator above a selected level indicative of solidification of strong solution in the heat exchanger or other such blockage. The bypass system includes a bypass line with a gooseneck located in the generator for controlling flow of strong solution into the bypass line and for preventing refrigerant vapor in the generator from entering the bypass line during normal operation of the refrigeration system. Also, the bypass line includes a trap section filled with liquid for providing a barrier to maintain the normal pressure difference between the generator and the absorber even when the gooseneck of the bypass line is exposed to refrigerant vapor in the generator. Strong solution, which may accumulate in the trap section of the bypass line, is diluted, to prevent solidification, by supplying weak solution to the trap section from a purge system for the absorption refrigeration system.

Reimann, Robert C. (Lafayette, NY)

1984-01-01T23:59:59.000Z

37

RCRA closure of the Building 3001 Storage Canal  

Science Conference Proceedings (OSTI)

The 3001 Storage Canal is located under portions of Buildings 3001 and 3019 at Oak Ridge National Laboratory (ORNL) and has a capacity of approximately 62,000 gallons of water. The term canal has historically been used to identify this structure, however, the canal is an in-ground reinforced concrete structure satisfying the regulatory definition of a tank. From 1943 through 1963, the canal in Building 3001 was designed to be an integral part of the system for handling irradiated fuel from the Oak Ridge Graphite Reactor. Because one of the main initial purposes of the reactor was to produce plutonium for the chemical processing pilot plant in Building 3019, the canal was designed to be the connecting link between the reactor and the pilot plant. During the war years, natural uranium slugs were irradiated in the reactor and then pushed out of the graphite matrix into the system of diversion plates and chutes which directed the fuel into the deep pit of the canal. After shutdown of the reactor, the canal was no longer needed for its designed purpose. Since 1964, the canal has only been used to store radioisotopes and irradiated samples under a water pool for radiation protection. This report describes closure alternatives.

Etheridge, J.T.; Thompson, W.T.

1992-09-01T23:59:59.000Z

38

System dynamics simulation of the expansion of the Panama Canal  

Science Conference Proceedings (OSTI)

The expansion of the Panama Canal could be the largest project attempted by the Republic of Panama in its 100 years of existence. The objective of this simulation study is to use the Canal Expansion project to develop and demonstrate how more precise ...

Humberto R. Alvarez A.; Dario Solis; Arnoldo R. Cano S.; Serge Sala-Diakanda

2006-12-01T23:59:59.000Z

39

Clustering analysis of water quality for canals in bangkok, thailand  

Science Conference Proceedings (OSTI)

Two clustering techniques of water quality for canals in Bangkok were compared: K-means and Fuzzy c-means. The result illustrated that K-means has a better performance. As a result, K-means cluster was used to classify 24 canals of 344 records of surface ... Keywords: K-means clustering, surface water quality, watershed management

Sirilak Areerachakul; Siripun Sanguansintukul

2010-03-01T23:59:59.000Z

40

Bypass aware instruction scheduling for register file power reduction  

Science Conference Proceedings (OSTI)

Since register files suffer from some of the highest power densities within processors, designers have investigated several architectural strategies for register file power reduction, including "On Demand RF Read" where the register file is read only ... Keywords: architecture-sensitive compiler, bypass-sensitive, forwarding paths, operation table, power consumption, processor bypasses, register file, reservation table

Sanghyun Park; Aviral Shrivastava; Nikil Dutt; Alex Nicolau; Yunheung Paek; Eugene Earlie

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

T-646: Debian fex authentication bypass | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Debian fex authentication bypass 6: Debian fex authentication bypass T-646: Debian fex authentication bypass June 14, 2011 - 3:45pm Addthis PROBLEM: The vulnerability is caused due to the application not properly verifying the existence of "auth-ID" when uploading files and can be exploited to bypass the authentication mechanism. PLATFORM: Debian fex ABSTRACT: Debian security discovered that fex, a web service for transferring very large, files, is not properly validating authentication IDs. While the service properly validates existing authentication IDs, an attacker who is not specifying any authentication ID at all, can bypass the authentication procedure. reference LINKS: DSA-2259-1 fex Secunia Advisory SA44940 Debian Security Advisory DSA-2259-1 fex-20110610.tar Vulnerability Report: Debian GNU/Linux 6.0

42

T-674: Drupal Secure Password Hashes Module Security Bypass Vulnerability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74: Drupal Secure Password Hashes Module Security Bypass 74: Drupal Secure Password Hashes Module Security Bypass Vulnerability T-674: Drupal Secure Password Hashes Module Security Bypass Vulnerability July 22, 2011 - 3:00pm Addthis PROBLEM: Drupal Secure Password Hashes Module Security Bypass Vulnerability PLATFORM: Drupal Secure Password Hashes 6.X-1.0 Drupal Secure Password Hashes 5.X-1.4 ABSTRACT: The Secure Password Hashes module for Drupal is prone to a security-bypass vulnerability. reference LINKS: Drupal Homepage SA-CONTRIB-2011-026 - Secure Password Hashes (phpass) - Multiple Vulnerabilities IMPACT ASSESSMENT: Medium Discussion: This module uses the PHPass hashing library to try to store users hashed passwords securely. The module sets a fixed string for the 'pass' column in the {users} database column but does not replace the pass attribute of the account

43

V-237: TYPO3 Security Bypass Vulnerabilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

V-237: TYPO3 Security Bypass Vulnerabilities V-237: TYPO3 Security Bypass Vulnerabilities V-237: TYPO3 Security Bypass Vulnerabilities September 9, 2013 - 6:00am Addthis PROBLEM: Some vulnerabilities have been reported in TYPO3 PLATFORM: TYPO3 6.x ABSTRACT: TYPO3 comes with the possibility to restrict editors to certain file actions (copy, delete, move etc.) and to restrict these actions to be performed in certain locations REFERENCE LINKS: Secunia Advisory SA54717 Security Focus ID 62257 IMPACT ASSESSMENT: Medium DISCUSSION: 1) Some errors when handling file actions can be exploited to bypass file action permission restrictions and e.g. create or read arbitrary files within or outside the webroot. 2) An error when validating file names within the file renaming functionality can be exploited to bypass the denied file extensions check

44

DOE - Office of Legacy Management -- Love Canal - NY 24  

Office of Legacy Management (LM)

Love Canal - NY 24 Love Canal - NY 24 FUSRAP Considered Sites Site: LOVE CANAL (NY.24 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None NY.24-1 Location: Region running from Old Military Road from the 16-acre rectangular piece of land in the southeast corner of Niagara Falls into the Township of Lewiston , Niagara Falls , New York NY.24-3 Evaluation Year: 1987 NY.24-1 Site Operations: Chemical storage and disposal. NY.24-1 NY.24-3 Site Disposition: Eliminated - No residual radioactive material found NY.24-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): Yes NY.24-5 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to LOVE CANAL

45

Water infrastructure : hybridized architecture along the Arizona canal  

E-Print Network (OSTI)

Due to budget issues, the Central Arizona Project (CAP) canal has been left exposed to the arid desert environment since its construction in the 1970s. As a result, 5% of the amount of water diverted from the Colorado River ...

Atwood, Alex (Wayne Alex)

2012-01-01T23:59:59.000Z

46

Transportation Center Seminar........ "The Panama Canal as Precursor"  

E-Print Network (OSTI)

Transportation Center Seminar........ "The Panama Canal as Precursor" Aaron J. Gellman Professor of Transportation The Transportation Center & Kellogg School of Management Northwestern University; Advisory:30 pm Location: Transportation Center, Chambers Hall Lower Level, 600 Foster St., Evanston Professor

Bustamante, Fabián E.

47

V-106: Citrix Access Gateway Unspecified Security Bypass Vulnerability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Citrix Access Gateway Unspecified Security Bypass 6: Citrix Access Gateway Unspecified Security Bypass Vulnerability V-106: Citrix Access Gateway Unspecified Security Bypass Vulnerability March 7, 2013 - 6:00am Addthis PROBLEM: A vulnerability has been reported in Citrix Access Gateway PLATFORM: Standard Edition 5.0.x prior to 5.0.4.223524. Versions 4.5.x and 4.6.x are not affected by this vulnerability ABSTRACT: A vulnerability has been reported in Citrix Access Gateway, which can be exploited by malicious people to bypass certain security restrictions. REFERENCE LINKS: Secunia Advisory SA52479 Security Tracker Alert ID 1028255 com/id/1028255 CVE-2013-2263 Citrix Knowledge Center IMPACT ASSESSMENT: High DISCUSSION: The vulnerability could allow an unauthenticated user to gain access to network resources. IMPACT:

48

V-103: RSA Authentication Agent Lets Remote Users Bypass Authentication  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: RSA Authentication Agent Lets Remote Users Bypass 3: RSA Authentication Agent Lets Remote Users Bypass Authentication Requirements V-103: RSA Authentication Agent Lets Remote Users Bypass Authentication Requirements March 4, 2013 - 12:27am Addthis PROBLEM: RSA Authentication Agent Lets Remote Users Bypass Authentication Requirements PLATFORM: RSA Authentication Agent 7.1, 7.1.1 for Microsoft Windows ABSTRACT: A vulnerability was reported in RSA Authentication Agent. REFERENCE LINKS: RSA SecurCare SecurityTracker Alert ID: 1028230 CVE-2013-0931 IMPACT ASSESSMENT: Medium DISCUSSION: On systems configured for Quick PIN Unlock, the system will request a PIN instead of a full Passcode when the session is activated from an active screensaver after the Quick PIN Unlock timeout has expired. RSA Authentication Agent on Windows Vista, Windows 7, Windows 2008, and

49

Advanced Vehicle Testing Activity - Oil Bypass Filtration Evaluation  

NLE Websites -- All DOE Office Websites (Extended Search)

with oil bypass filter systems from PuraDYN Filter Technologies (8 buses) and Refined Global Solutions (3 buses). Six gasoline-equipped INL Tahoes are also equipped with PuraDYN...

50

Oil Bypass Filter Technology Evaluation - Tenth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INLEXT-05-00381 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Tenth Quarterly Report January-March 2005 TECHNICAL...

51

Oil Bypass Filter Technology Evaluation - Third Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INEELEXT-03-00974 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Evaluation Third Quarterly Report April-June 2003 Larry Zirker James...

52

Oil Bypass Filter Technology Evaluation - Ninth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

INLEXT-05-00040 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Ninth Quarterly Report October-December 2004 TECHNICAL...

53

Oil Bypass Filter Technology Performance Evaluation - First Quarterly Report  

DOE Green Energy (OSTI)

This report details the initial activities to evaluate the performance of the oil bypass filter technology being tested by the Idaho National Engineering and Environmental Laboratory (INEEL) for the U.S. Department of Energy's FreedomCAR & Vehicle Technologies Program. Eight full-size, four-cycle diesel-engine buses used to transport INEEL employees on various routes have been equipped with oil bypass systems from the puraDYN Corporation. Each bus averages about 60,000 miles a year. The evaluation includes an oil analysis regime to monitor the presence of necessary additives in the oil and to detect undesirable contaminants. Very preliminary economic analysis suggests that the oil bypass system can reduce life-cycle costs. As the evaluation continues and oil avoidance costs are quantified, it is estimated that the bypass system economics may prove increasingly favorable, given the anticipated savings in operational costs and in reduced use of oil and waste oil avoidance.

Zirker, L.R.; Francfort, J.E.

2003-01-31T23:59:59.000Z

54

Bypass flow computations on the LOFA transient in a VHTR  

Science Conference Proceedings (OSTI)

Bypass flow in the prismatic gas-cooled very high temperature reactor (VHTR) is not intentionally designed to occur, but is present in the gaps between graphite blocks. Previous studies of the bypass flow in the core indicated that the cooling provided by flow in the bypass gaps had a significant effect on temperature and flow distributions for normal operating conditions. However, the flow and heat transports in the core are changed significantly after a Loss of Flow Accident (LOFA). This study aims to study the effect and role of the bypass flow after a LOFA in terms of the temperature and flow distributions and for the heat transport out of the core by natural convection of the coolant for a 1/12 symmetric section of the active core which is composed of images and mirror images of two sub-region models. The two sub-region models, 9 x 1/12 and 15 x 1/12 symmetric sectors of the active core, are employed as the CFD flow models using computational grid systems of 70.2 million and 117 million nodes, respectively. It is concluded that the effect of bypass flow is significant for the initial conditions and the beginning of LOFA, but the bypass flow has little effect after a long period of time in the transient computation of natural circulation.

Yu-Hsin Tung; Richard W. Johnson; Yuh-Ming Ferng; Ching-Chang Chieng

2014-01-01T23:59:59.000Z

55

Evaluation of Oil Bypass Filter Technology on Heavy-Duty Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

(Advanced Vehicle Testing Activity) (Advanced Vehicle Testing Activity) Evaluation of Oil Bypass Filter Technology on Heavy-Duty Vehicles James Francfort American Filtration and Separations Society April 2005 Presentation Outline * Background & Objectives * Oil bypass filters - features & reported benefits * INL testing method * puraDYN oil bypass filters * Refined Global Solutions (RGS) oil bypass filters * Testing results & trends * Particulate and ferrography testing * Initial INL Oil Bypass Filter Economics * Potential fleet oil savings * Testing Status Bypass Filter Evaluation - Background * Funded by the U.S. Department of Energy's FreedomCAR & Vehicle Technologies Program (Advanced Vehicle Testing Activity) * Vehicles operated by Idaho National Laboratory's Fleet Operations group * Idaho National Laboratory

56

Photovoltaic-module bypass-diode encapsulation. Annual report  

DOE Green Energy (OSTI)

The design and processing techniques necessary to incorporate bypass diodes within the module encapsulant are presented in this annual report. A comprehensive survey of available pad-mounted PN junction and Schottky diodes led to the selection of Semicon PN junction diode cells for this application. Diode junction-to-heat spreader thermal resistance measurements, performed on a variety of mounted diode chip types and sizes, have yielded values which are consistently below 1/sup 0/C per watt, but show some instability when thermally cycled over the temperature range from -40 to 150/sup 0/C. Based on the results of a detailed thermal analysis, which covered the range of bypass currents from 2 to 20 amperes, three representative experimental modules, each incorporating integral bypass diode/heat spreader assemblies of various sizes, were designed and fabricated. Thermal testing of these modules has enabled the formation of a recommended heat spreader plate sizing relationship. The production cost of three encapsulated bypass diode/heat spreader assemblies were compared with similarly rated externally-mounted packaged diodes. An assessment of bypass diode reliability, which relies heavily on rectifying diode failure rate data, leads to the general conclusion that, when proper designed and installed, these devices will improve the overall reliability of a terrestrial array over a 20 year design lifetime.

Not Available

1983-06-20T23:59:59.000Z

57

V-005: ModSecurity Multipart Message Parsing Security Bypass Vulnerability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: ModSecurity Multipart Message Parsing Security Bypass 5: ModSecurity Multipart Message Parsing Security Bypass Vulnerability V-005: ModSecurity Multipart Message Parsing Security Bypass Vulnerability October 18, 2012 - 6:00am Addthis PROBLEM: ModSecurity Multipart Message Parsing Security Bypass Vulnerability PLATFORM: Modsecurity Versions prior to 2.70 ABSTRACT: SEC Consult has reported a vulnerability in ModSecurity, which can be exploited by malicious people to bypass certain security restrictions REFERENCE LINKS: SEC Consult Secunia Advisory SA49853 IMPACT ASSESSMENT: Medium DISCUSSION: The vulnerability is caused due to an error when parsing multipart requests and can be exploited to bypass certain filtering rules. IMPACT: Remote Security Bypass SOLUTION: Update to version 2.70. Addthis Related Articles V-017: Apache Tomcat Security Bypass and Denial of Service Vulnerabilities

58

Winds, Upwelling and Fog at Cape Cod Canal, Massachusetts  

Science Conference Proceedings (OSTI)

New observations confirm the formation of advective fogs over the western approaches to the Cape Cod Canal. The large air-water temperature differences required for the formation of these fogs are shown to occur when the colder Cape Cod Bay ...

Alfred H. Woodcock

1984-04-01T23:59:59.000Z

59

Movement of Fall Chinook Salmon Fry Oncorhynchus Tshawytscha : A Comparison of Approach Angles for Fish Bypass in a Modular Rotary Drum Fish Screen.  

DOE Green Energy (OSTI)

The Pacific Northwest National Laboratory (PNNL) performed tests to determine whether a significant difference in fish passage existed between a 6-ft screening facility built perpendicularly to canal flow and an identical screening facility with the screen mounted at a 45-degree angle to the approach channel. A modular drum screen built by the Washington Department of Fish and Wildlife was installed at PNNL`s Aquatic Ecology research laboratory in Richland, Washington. Fall chinook salmon fry were introduced into the test system, and their movements were monitored. A total of 14 tests (400 fish per test) that lasted 20 hours were completed during April and May, 1996. There was no significant difference in fish passage rate through the two approach configurations. Attraction flow to the bypass across the face of the screen was more evident for the angled approach, although this did not appear to play a significant role in attracting fish to the bypass. Approach velocities at the face of the screen did not exceed the 0.4 fps criteria for either approach configuration and posed not threat to fish. No fish passed over, around, or through the drum screen during any test.

Neitzel, D.A.; Blanton, S.L.; Abernethy, C. Scott; Daly, D.S. [Pacific Northwest National Laboratory, Richland, WA (United States)

1996-08-01T23:59:59.000Z

60

Thermal Reliability Study of Bypass Diodes in Photovoltaic Modules (Poster)  

DOE Green Energy (OSTI)

This paper presents the result of high-temperature durability and thermal cycling testing and analysis for the selected diodes to study the detail of the thermal design and relative long-term reliability of the bypass diodes used to limit the detrimental effects of module hot-spot susceptibility.

Zhang, Z.; Wohlgemuth, J.; Kurtz, S.

2013-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Cycling firing method for bypass operation of bridge converters  

DOE Patents (OSTI)

The bridge converter comprises a number of switching elements and an electronic logic system which regulated the electric power levels by controlling the firing, i.e., the initiation of the conduction period of the switching elements. Cyclic firing of said elements allows the direct current to bypass the alternating current system with high power factor and negligible losses.

Zabar, Zivan (99-72 66th Rd., Apt. 9N, Forest Hills, NY 11375)

1982-01-01T23:59:59.000Z

62

Canal Fulton, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Canal Fulton, Ohio: Energy Resources Canal Fulton, Ohio: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.8897784°, -81.597623° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.8897784,"lon":-81.597623,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

63

Bradfield Canal Hot Spring Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Bradfield Canal Hot Spring Geothermal Area Bradfield Canal Hot Spring Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Bradfield Canal Hot Spring Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.23642663,"lon":-131.264006,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

64

RTD bypass system elimination at Virgil C. Summer Station  

SciTech Connect

This paper reports on the resistance temperature detector (RTD) bypass system removal project which was a high dose job, a large capital project and had the potential to be a critical path item. The purpose of this project was to remove the existing direct immersion temperature detection system requiring primary coolant bypass piping, and replace it with the latest in RTD technology. These are well-mounted RTDs, which are more reliable and require much less personnel radiation dose during maintenance. As a result of the project, the source term at V.C. Summer was significantly reduced and dose rates inside the loop cavities were decreased by a factor of seven on average. This has resulted in lower cumulative exposure for reactor coolant pump, steam generator, and general maintenance activities.

Mothena, P.A. (South Carolina Electric and Gas Co. (US))

1992-02-01T23:59:59.000Z

65

Today in Energy - Suez Canal, Sumed Pipeline are key parts of ...  

U.S. Energy Information Administration (EIA)

Egypt plays a vital role in international energy markets through the operation of the Suez Canal and Suez-Mediterranean (Sumed) Pipeline. In 2012, about 7% of all ...

66

Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology on Heavy and Light Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

Demonstrated Petroleum Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology on Heavy and Light Vehicles James Francfort (PI) Timothy Murphy Larry Zirker Oil Bypass Filter Technology Evaluation * Funded by the U.S. Department of Energy's FreedomCAR & Vehicle Technologies Program * Performed by Idaho National Engineering and Environmental Laboratory (INEEL) Fleet Operations * Goal - Support DOE's efforts to reduce petroleum consumption & ensure the energy security of the United States Oil Bypass Filter Technology Evaluation * Objectives - Test the concept of using oil bypass filters to minimize engine oil changes & the generation of waste oils - Demonstration the economics of oil bypass filter systems - Estimate potential engine oil saving from bypass filter technologies that can be achieved by INEEL,

67

U-061: RSA Adaptive Authentication Bugs Let Remote Users Bypass Certain  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: RSA Adaptive Authentication Bugs Let Remote Users Bypass 1: RSA Adaptive Authentication Bugs Let Remote Users Bypass Certain Security Controls U-061: RSA Adaptive Authentication Bugs Let Remote Users Bypass Certain Security Controls December 14, 2011 - 8:17am Addthis PROBLEM: RSA Adaptive Authentication Bugs Let Remote Users Bypass Certain Security Controls. PLATFORM: 6.0.2.1 SP1 Patch 2 and SP1 Patch 3 6.0.2.1 SP2 and SP2 Patch 1 6.0.2.1 SP3 ABSTRACT: A remote user may be able to bypass certain security controls. reference LINKS: SecurityTracker Alert ID: 1026420 Security Focus: ESA-2011-036 IMPACT ASSESSMENT: Medium Discussion: Two vulnerabilities were reported in RSA Adaptive Authentication (On-Premise). A remote user may be able to bypass certain security controls. A remote user can send specially crafted data elements to affect the Device

68

V-057: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

V-057: eXtplorer "ext_find_user()" Authentication Bypass V-057: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability V-057: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability December 28, 2012 - 6:00am Addthis December 28 2012 - 6:00am PROBLEM: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability PLATFORM: eXtplorer 2.x ABSTRACT: A vulnerability has been reported in eXtplorer, which can be exploited by malicious people to bypass certain security restrictions. REFERENCE LINKS: Secunia Advisory SA51636 eXtplorer 2.1.3 Security Release IMPACT ASSESSMENT: Medium DISCUSSION: eXtplorer was notified of a problem within the authentication system of eXtplorer Versions 2.1.2, 2.1.1, 2.1.0 and 2.1.0RC5 that have been found to be vulnerable to an authentication bypass bug.

69

U-234: Oracle MySQL User Login Security Bypass Vulnerability | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

234: Oracle MySQL User Login Security Bypass Vulnerability 234: Oracle MySQL User Login Security Bypass Vulnerability U-234: Oracle MySQL User Login Security Bypass Vulnerability August 14, 2012 - 7:00am Addthis PROBLEM: Oracle MySQL User Login Security Bypass Vulnerability PLATFORM: Version(s): prior to 5.1.63 and 5.5.25 are vulnerable. ABSTRACT: Oracle MySQL is prone to a security bypass vulnerability Attackers can exploit this issue to bypass certain security restrictions. REFERENCE LINKS: http://www.securityfocus.com/bid/53911/discuss CVE-2012-2122 IMPACT ASSESSMENT: Medium Discussion: Security researchers have released details about a vulnerability in the MySQL server that could allow potential attackers to access MySQL databases without inputting proper authentication credentials.The vulnerability is identified as CVE-2012-2122 and was addressed in MySQL 5.1.63 and 5.5.25 in

70

Potential hydroelectric power Mora Canal Drop. Final report  

DOE Green Energy (OSTI)

The feasibility of installing a hydroelectric power plant on the Mora Canal Drop site in Idaho was studied. It was recommended that a 1900 kW unit be installed to generate 8,113,000 kWh per year. The project should cost approximately $1.8 million. The generating cost would be between 20.3 and 22.2 mills/kWh. A local utility has offered to buy all power produced at 26 mills/kWh. No adverse environment, safety, or socio-economic effects are foreseen. (LCL)

Willer, D.C.

1978-12-01T23:59:59.000Z

71

V-077: Barracuda SSL VPN Bug Lets Remote Users Bypass Authentication...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

property (via 'setSysProp.jsp') to bypass access restrictions and gain access to the API functionality. This can be exploited to download configuration files, download database...

72

V-236: MediaWiki CentralAuth Extension Authentication Bypass...  

NLE Websites -- All DOE Office Websites (Extended Search)

IMPACT ASSESSMENT: Medium DISCUSSION: The vulnerability is caused due to an error when handling auto-logins and can be exploited to bypass the authentication mechanism by...

73

U-247: EMC Cloud Tiering Appliance Flaw Lets Remote Users Bypass...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Manager Database Authentication Bypass Vulnerability V-120: EMC Smarts Network Configuration Manager Java RMI Access Control Flaw Lets Remote Users Gain Full Control...

74

Relationship between canal and levee density and coastal land loss in Louisiana  

SciTech Connect

Nearly 1% of Louisiana's coastal land becomes water each year. This land loss affects everything from wildlife, fisheries, and recreation to the economy and culture. A part of this loss results from natural, unmanageable factors, but manageable factors are also responsible. This report discusses one of the manageable factors: canals and their dredged-material levees. In coastal Louisiana wetlands, canals are constructed primarily to facilitate navigation and oil and gas recovery. The density of canals in this region is now about equal to the natural network of bayous and creeks. The primary effect of these canals and associated levees is to alter the process of flooding and drainage. The influence of canals and their levees on coastal Louisiana erosion rates are modified by local geologic, hydrologic, and biologic interactions. The empirical relationship between canals and erosion is, however, clear; land loss is directly related to canal density. Comparisons with mosquito ditches, which are smaller analogues of canals, reveal similar patterns of wetland changes and suggest management options.

Turner, R.E.

1987-12-01T23:59:59.000Z

75

Application of the soil and water assessment tool in a tropical agricultural catchment of the Panama Canal watershed implications for its use in watershed management activities.  

E-Print Network (OSTI)

??The Panama Canal Watershed (PCW) provides water to operate the Canal, generate hydroelectricity, and supply water provisions to the local and metropolitan populations. With a… (more)

Oestreicher, Jordan

2008-01-01T23:59:59.000Z

76

Systems and methods for biometric identification using the acoustic properties of the ear canal  

DOE Patents (OSTI)

The present invention teaches systems and methods for verifying or recognizing a person's identity based on measurements of the acoustic response of the individual's ear canal. The system comprises an acoustic emission device, which emits an acoustic source signal s(t), designated by a computer, into the ear canal of an individual, and an acoustic response detection device, which detects the acoustic response signal f(t). A computer digitizes the response (detected) signal f(t) and stores the data. Computer-implemented algorithms analyze the response signal f(t) to produce ear-canal feature data. The ear-canal feature data obtained during enrollment is stored on the computer, or some other recording medium, to compare the enrollment data with ear-canal feature data produced in a subsequent access attempt, to determine if the individual has previously been enrolled. The system can also be adapted for remote access applications.

Bouchard, Ann Marie (Albuquerque, NM); Osbourn, Gordon Cecil (Albuquerque, NM)

1998-01-01T23:59:59.000Z

77

Inferring Species Trees Directly from Biallelic Genetic Markers: Bypassing Gene Trees in a Full Coalescent Analysis  

E-Print Network (OSTI)

Inferring Species Trees Directly from Biallelic Genetic Markers: Bypassing Gene Trees in a Full the likelihood of a species tree directly from the markers under a finite-sites model of mutation effectively in an algorithm that allows us to bypass the gene trees and compute species tree likelihoods directly from

Rosenberg, Noah

78

2009 ASHRAE 199 The issue of filter bypass has long been a topic of much  

E-Print Network (OSTI)

©2009 ASHRAE 199 ABSTRACT The issue of filter bypass has long been a topic of much interest on filtration efficiency. In this research, an ASHRAE 52.2 compliant test loop was used to study bypass, a test apparatus designed to ASHRAE Standard 52.2-2007 was used. This standard provides a methodology

Siegel, Jeffrey

79

V-186: Drupal Login Security Module Security Bypass and Denial of Service  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Drupal Login Security Module Security Bypass and Denial of 6: Drupal Login Security Module Security Bypass and Denial of Service Vulnerability V-186: Drupal Login Security Module Security Bypass and Denial of Service Vulnerability June 26, 2013 - 1:28am Addthis PROBLEM: Drupal Login Security Module Security Bypass and Denial of Service Vulnerability PLATFORM: Login Security 6.x-1.x versions prior to 6.x-1.2. Login Security 7.x-1.x versions prior to 7.x-1.2. ABSTRACT: A security issue and a vulnerability have been reported in the Login Security module for Drupal REFERENCE LINKS: Advisory ID: DRUPAL-SA-CONTRIB-2013-053 Secunia Advisory SA53717 CVE-2013-2197 CVE-2013-2198 IMPACT ASSESSMENT: Medium DISCUSSION: 1) The security issue is caused due to an unspecified error and can be exploited to bypass the module features. Successful exploitation requires the "soft blocking" feature to be

80

V-040: Apache Tomcat Bug Lets Remote Users Bypass Security Constraints |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Apache Tomcat Bug Lets Remote Users Bypass Security 0: Apache Tomcat Bug Lets Remote Users Bypass Security Constraints V-040: Apache Tomcat Bug Lets Remote Users Bypass Security Constraints December 5, 2012 - 1:00am Addthis PROBLEM: Apache Tomcat Bug Lets Remote Users Bypass Security Constraints PLATFORM: Version(s): 6.0.0 - 6.0.35, 7.0.0 - 7.0.29 ABSTRACT: A vulnerability was reported in Apache Tomcat. REFERENCE LINKS: Apache Tomcat Red Hat Bugzilla - Bug 883634 SecurityTracker Alert ID: 1027833 CVE-2012-3546 IMPACT ASSESSMENT: High DISCUSSION: When using FORM authentication it was possible to bypass the security constraint checks in the FORM authenticator by appending /j_security_check to the end of the URL if some other component (such as the Single-Sign-On valve) had called request.setUserPrincipal() before the call to

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

T-707: Apache Tomcat AJP Protocol Processing Bug Lets Remote Users Bypass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Apache Tomcat AJP Protocol Processing Bug Lets Remote Users 7: Apache Tomcat AJP Protocol Processing Bug Lets Remote Users Bypass Authentication or Obtain Information T-707: Apache Tomcat AJP Protocol Processing Bug Lets Remote Users Bypass Authentication or Obtain Information August 31, 2011 - 12:00pm Addthis PROBLEM: A vulnerability was reported in Apache Tomcat. A remote user can bypass authentication or obtain potentially sensitive information. PLATFORM: Apache Tomcat 5.5.0 to 5.5.33, 6.0.0 to 6.0.33, 7.0.0 to 7.0.20 ABSTRACT: Apache Tomcat AJP protocol processing bug lets remote users bypass authentication or obtain information. reference LINKS: SecurityTracker Alert ID: 1025993 CVE-2011-3190 (under review) Apache Tomcat Security Updates IMPACT ASSESSMENT: Medium Discussion: A vulnerability was reported in Apache Tomcat. A remote user can bypass

82

V-236: MediaWiki CentralAuth Extension Authentication Bypass Vulnerability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: MediaWiki CentralAuth Extension Authentication Bypass 6: MediaWiki CentralAuth Extension Authentication Bypass Vulnerability V-236: MediaWiki CentralAuth Extension Authentication Bypass Vulnerability September 6, 2013 - 4:36am Addthis PROBLEM: A vulnerability has been reported in the CentralAuth extension for MediaWiki, which can be exploited by malicious people to bypass certain security restrictions. PLATFORM: MediaWiki CentralAuth Extension ABSTRACT: A vulnerability has been reported in the CentralAuth extension for MediaWik REFERENCE LINKS: Secunia Advisory SA54723 IMPACT ASSESSMENT: Medium DISCUSSION: The vulnerability is caused due to an error when handling auto-logins and can be exploited to bypass the authentication mechanism by providing a valid username within the "centralauth_User" cookie. IMPACT:

83

V-052: Drupal Core Access Bypass and Arbitrary PHP Code Execution  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

52: Drupal Core Access Bypass and Arbitrary PHP Code Execution 52: Drupal Core Access Bypass and Arbitrary PHP Code Execution Vulnerabilities V-052: Drupal Core Access Bypass and Arbitrary PHP Code Execution Vulnerabilities December 21, 2012 - 12:15am Addthis PROBLEM: Drupal Core Access Bypass and Arbitrary PHP Code Execution Vulnerabilities PLATFORM: Drupal 6.x versions prior to 6.27 Drupal 7.x versions prior to 7.18 ABSTRACT: Drupal Core Multiple vulnerabilities REFERENCE LINKS: SA-CORE-2012-004 - Drupal core Bugtraq ID: 56993 Secunia Advisory SA51517 CVE-2012-5651 CVE-2012-5652 CVE-2012-5653 IMPACT ASSESSMENT: Medium DISCUSSION: An attacker can exploit these issues to execute arbitrary PHP code within the context of the web server, bypass certain security restrictions, and perform unauthorized actions; this may aid in launching further attacks.

84

V-017: Apache Tomcat Security Bypass and Denial of Service Vulnerabilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Apache Tomcat Security Bypass and Denial of Service 7: Apache Tomcat Security Bypass and Denial of Service Vulnerabilities V-017: Apache Tomcat Security Bypass and Denial of Service Vulnerabilities November 6, 2012 - 6:00am Addthis PROBLEM: Apache Tomcat Security Bypass and Denial of Service Vulnerabilities PLATFORM: Apache Tomcat 5.x Apache Tomcat 6.x Apache Tomcat 7.x ABSTRACT: Two vulnerabilities were reported in Apache Tomcat REFERENCE LINKS: Apache.org Apache Tomcat Denial of Service Apache Tomcat DIGEST authentication weaknesses Secunia Advisory SA51138 CVE-2012-2733 CVE-2012-3439 IMPACT ASSESSMENT: Medium DISCUSSION: A weakness and a vulnerability have been reported in Apache Tomcat, which can be exploited by malicious people to bypass certain security restrictions and cause a DoS (Denial of Service). 1) An error within the "parseHeaders()" function

85

3001 canal radiological characterization and waste removal report, Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

An underground steel reinforced concrete transfer and storage canal was built in 1943 and operated as an integral part of the Oak Ridge Graphite Reactor Building (3001) until 1963 when the reactor was shutdown. During operation, the canal was used for under water transfer of irradiated materials and other metals from the reactor in Building 3001 to the Building 3019 hot cell for further processing. After shutdown of the reactor, the canal was used for storage of irradiated materials and fission products until 1990 when the larger materials were removed and stored in the Department of Energy (DOE) approved solid waste management storage facilities. At that time it was discovered that a considerable amount of sludge had accumulated over the intervening years and subsequent analysis showed that the sludge contained Resource Conservation and Recovery Act (RCRA) materials that violated quantities allowed by the RCRA regulations. It was also recognized in 1990 that the canal was losing water to evaporation and the ground at the rate of approximately 400 gallons per day. To maintain water quality; i.e., radionuclide content at or near DOE derived concentration guidelines (DCG), the water in the canal is constantly demineralized using a demineralizer in the Building 3001 and demineralized make up water is supplied from the Building 3004 demineralizer. This report summarizes the 301 Canal Cleanup Task and the solid waste removed from the 3001 Canal in 1996.

Ritchie, M.G. [Science Applications International Corp., Oak Ridge, TN (United States)

1996-12-01T23:59:59.000Z

86

Risk-Based Disposal Plan for PCB Paint in the TRA Fluorinel Dissolution Process Mockup and Gamma Facilities Canal  

SciTech Connect

This Toxic Substances Control Act Risk-Based Polychlorinated Biphenyl Disposal plan was developed for the Test Reactor Area Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System, located in Building TRA-641 at the Reactor Technology Complex, Idaho National Laboratory Site, to address painted surfaces in the empty canal under 40 CFR 761.62(c) for paint, and under 40 CFR 761.61(c) for PCBs that may have penetrated into the concrete. The canal walls and floor will be painted with two coats of contrasting non-PCB paint and labeled as PCB. The canal is covered with open decking; the access grate is locked shut and signed to indicate PCB contamination in the canal. Access to the canal will require facility manager permission. Protective equipment for personnel and equipment entering the canal will be required. Waste from the canal, generated during ultimate Decontamination and Decommissioning, shall be managed and disposed as PCB Bulk Product Waste.

R. A. Montgomery

2008-05-01T23:59:59.000Z

87

Pre-test CFD Calculations for a Bypass Flow Standard Problem  

SciTech Connect

The bypass flow in a prismatic high temperature gas-cooled reactor (HTGR) is the flow that occurs between adjacent graphite blocks. Gaps exist between blocks due to variances in their manufacture and installation and because of the expansion and shrinkage of the blocks from heating and irradiation. Although the temperature of fuel compacts and graphite is sensitive to the presence of bypass flow, there is great uncertainty in the level and effects of the bypass flow. The Next Generation Nuclear Plant (NGNP) program at the Idaho National Laboratory has undertaken to produce experimental data of isothermal bypass flow between three adjacent graphite blocks. These data are intended to provide validation for computational fluid dynamic (CFD) analyses of the bypass flow. Such validation data sets are called Standard Problems in the nuclear safety analysis field. Details of the experimental apparatus as well as several pre-test calculations of the bypass flow are provided. Pre-test calculations are useful in examining the nature of the flow and to see if there are any problems associated with the flow and its measurement. The apparatus is designed to be able to provide three different gap widths in the vertical direction (the direction of the normal coolant flow) and two gap widths in the horizontal direction. It is expected that the vertical bypass flow will range from laminar to transitional to turbulent flow for the different gap widths that will be available.

Rich Johnson

2011-11-01T23:59:59.000Z

88

Dehumidification Without Re-heat Using Face and Bypass Dampers  

E-Print Network (OSTI)

Installations with chill water cooling, needing constant air volume and dehumidification, traditionally use a draw through air handling unit with a cooling coil and a re-heat coil. Dehumidification is achieved by overcooling the discharge air to wring out moisture and then reheating it back to the desired temperature. This method works well but at the added expense of over cooling plus re-heating. A properly controlled Face and Bypass unit can deliver the same air conditions by blending return air and cold deck air with no need for re-heat. This system uses only the amount of cooling energy needed to do the job and no re-heat energy, in some cases as much as 50% less energy than the re-heat method.

Warila, D. T.

1994-01-01T23:59:59.000Z

89

New pathway to bypass the 15O waiting point  

E-Print Network (OSTI)

We propose the sequential reaction process $^{15}$O($p$,$\\gamma)(\\beta^{+}$)$^{16}$O as a new pathway to bypass of the $^{15}$O waiting point. This exotic reaction is found to have a surprisingly high cross section, approximately 10$^{10}$ times higher than the $^{15}$O($p$,$\\beta^{+}$)$^{16}$O. These cross sections were calculated after precise measurements of energies and widths of the proton-unbound $^{16}$F low lying states, obtained using the H($^{15}$O,p)$^{15}$O reaction. The large $(p,\\gamma)(\\beta^{+})$ cross section can be understood to arise from the more efficient feeding of the low energy wing of the ground state resonance by the gamma decay. The implications of the new reaction in novae explosions and X-ray bursts are discussed.

I. Stefan; F. de Oliveira Santos; M. G. Pellegriti; G. Dumitru; J. C. Angélique; M. Angélique; E. Berthoumieux; A. Buta; R. Borcea; A. Coc; J. M. Daugas; T. Davinson; M. Fadil; S. Grévy; J. Kiener; A. Lefebvre-Schuhl; M. Lenhardt; M. Lewitowicz; F. Negoita; D. Pantelica; L. Perrot; O. Roig; M. G. Saint Laurent; I. Ray; O. Sorlin; M. Stanoiu; C. Stodel; V. Tatischeff; J. C. Thomas

2006-03-22T23:59:59.000Z

90

Development of By-Pass Blending Station System  

E-Print Network (OSTI)

A new building blending station system named by-pass blending station (BBS) has been developed to reduce building pump energy consumption in both district heating and cooling systems. Theoretical investigation demonstrated that the BBS can significantly reduce building pump power for a typical cooling system when constant water flow is maintained in the building side. When differential pressure reset is applied in the building side, more pump energy can be saved. The BBS also reduces the pump size and therefore results in lower initial system cost. A case study was also performed and demonstrated 42% of annual chilled water pump energy savings for constant building water flow, and 82% of annual chilled water pump savings for differential pressure resetting at Omaha, Nebraska.

Liu, M.; Barnes, D.; Bunz, K.; Rosenberry, N.

2003-01-01T23:59:59.000Z

91

Evaluation of a Stirling engine heater bypass with the NASA Lewis nodal-analysis performance code  

SciTech Connect

In support of the US Department of Energy's Stirling Engine Highway Vehicle Systems program, the NASA Lewis Research Center investigated whether bypassing the P-40 Stirling engine heater during regenerative cooling would improve the engine thermal efficiency. The investigation was accomplished by using the Lewis nodal-analysis Stirling engine computer model. Bypassing the P-40 Stirling engine heater at full power resulted in a rise in the indicated thermal efficiency from 40.6 to 41.0 percent. For the idealized (some losses not included) heater bypass that was analyzed, this benefit is not considered significant.

Sullivan, T.J.

1986-05-01T23:59:59.000Z

92

Flow and Hydraulics near the Sill of Hood Canal, a Strongly Sheared, Continuously Stratified Fjord  

Science Conference Proceedings (OSTI)

Hood Canal, a long fjord in Washington State, has strong tides but limited deep-water renewal landward of a complex constriction. Tide-resolving hydrographic and velocity observations at the constriction, with a depth-cycling towed body, varied ...

M. C. Gregg; L. J. Pratt

2010-05-01T23:59:59.000Z

93

Étude expérimentale de l'écoulement gaz-liquide dans un canal ouvert vers le bas.  

E-Print Network (OSTI)

??Les travaux présentés ici ont pour objet l'étude fondamentale de l'écoulement gaz-liquide dans un canal ouvert vers le bas. Cette étude permettra de mieux comprendre… (more)

Toulouse, Dominic

2007-01-01T23:59:59.000Z

94

Thermal Imaging of Canals for Remote Detection of Leaks: Evaluation in the United Irrigation District  

E-Print Network (OSTI)

This report summarizes our initial analysis of the potential of thermal imaging for detecting leaking canals and pipelines. Thermal imagery (video format) was obtained during a fly over of a portion of the main canal of United Irrigation District. The video was processed to produce individual images, and 45 potential sites were identified as having possible canal leakage problems (see Appendix I for all 45 thermal images). District Management System Team personnel traveled to 11 of the 45 sites to determine if canal leakage was actually occurring. Of the 11 sites, 10 had leakage problems. Thus, thermal image analysis had a success rate of 91% for leak detection. Two sites had leaks classified as “severe” by the DMS Team. This report also provides a detailed analysis of 4 sites, 3 with leaks and 1 without. For each site, photographs are included showing the source of the leak and/or condition of the canal segment. A literature review of thermal imagery for leak detection is included in Appendix II. Our findings and recommendations are as following: 1. thermal imaging is a promising technique for evaluation of canal conditions and leak detection; 2. the district provide should provide personnel to help the DMS Team verify the remaining 34 sites; and 3. the district should consider correcting the problems identified at sites 7 and 8.

Huang, Yanbo; Fipps, Guy

2008-11-01T23:59:59.000Z

95

V-045: Adobe ColdFusion Lets Local Users Bypass Sandbox Restrictions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Adobe ColdFusion Lets Local Users Bypass Sandbox 5: Adobe ColdFusion Lets Local Users Bypass Sandbox Restrictions V-045: Adobe ColdFusion Lets Local Users Bypass Sandbox Restrictions December 12, 2012 - 2:00am Addthis PROBLEM: Adobe ColdFusion Lets Local Users Bypass Sandbox Restrictions PLATFORM: ColdFusion 10, 9.0.2, 9.0.1 and 9.0 for Windows, Macintosh and UNIX ABSTRACT: A vulnerability was reported in Adobe ColdFusion. REFERENCE LINKS: SecurityTracker Alert ID: 1027853 Adobe Vulnerability identifier: APSB12-26 CVE 2012-5675 IMPACT ASSESSMENT: High DISCUSSION: Adobe has released a security hotfix for ColdFusion 10 and earlier versions for Windows, Macintosh and UNIX. This hotfix resolves a vulnerability which could result in a sandbox permissions violation in a shared hosting environment. Adobe recommends users update their product installation using

96

U-247: EMC Cloud Tiering Appliance Flaw Lets Remote Users Bypass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: EMC Cloud Tiering Appliance Flaw Lets Remote Users Bypass 7: EMC Cloud Tiering Appliance Flaw Lets Remote Users Bypass Authentication and Gain Administrative Access U-247: EMC Cloud Tiering Appliance Flaw Lets Remote Users Bypass Authentication and Gain Administrative Access August 29, 2012 - 6:00am Addthis PROBLEM: EMC Cloud Tiering Appliance Flaw Lets Remote Users Bypass Authentication and Gain Administrative Access PLATFORM: EMC Cloud Tiering Appliance (CTA) 7.4 and prior EMC Cloud Tiering Appliance Virtual Edition (CTA/VE) 7.4 and prior EMC Cloud Tiering Appliance (CTA) 9.0 and prior EMC Cloud Tiering Appliance Virtual Edition (CTA/VE) 9.0 and prior ABSTRACT: A vulnerability was reported in EMC Cloud Tiering Appliance. reference LINKS: SecurityTracker Alert ID: 1027448 Bugtraq ID: 55250 EMC.com CVE-2012-2285 IMPACT ASSESSMENT:

97

V-216: Drupal Monster Menus Module Security Bypass and Script Insertion  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

216: Drupal Monster Menus Module Security Bypass and Script 216: Drupal Monster Menus Module Security Bypass and Script Insertion Vulnerabilities V-216: Drupal Monster Menus Module Security Bypass and Script Insertion Vulnerabilities August 12, 2013 - 6:00am Addthis PROBLEM: Two vulnerabilities have been reported in the Monster Menus module for Drupal PLATFORM: Drupal Monster Menus Module 6.x and 7.x ABSTRACT: The vulnerabilities can be exploited by malicious users to bypass certain security restrictions and conduct script insertion attacks. REFERENCE LINKS: Secunia Advisory SA54391 Drupal Security Advisory CVE-2013-4229 CVE-2013-4230 IMPACT ASSES SMENT: Medium DISCUSSION: 1) Input passed via the title when editing page settings is not properly sanitised before being edited the next time. This can be exploited to insert arbitrary HTML and script code, which will be executed in a user's

98

T-594: IBM solidDB Password Hash Authentication Bypass Vulnerability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

94: IBM solidDB Password Hash Authentication Bypass 94: IBM solidDB Password Hash Authentication Bypass Vulnerability T-594: IBM solidDB Password Hash Authentication Bypass Vulnerability April 4, 2011 - 6:08am Addthis PROBLEM: A vulnerability has been reported in IBM solidDB, which can be exploited by malicious people to bypass certain security restrictions. PLATFORM: IBM solidDB 4.x - IBM solidDB 6.x ABSTRACT: This vulnerability could allow remote attackers to execute arbitrary code on vulnerable installations of IBM solidDB. Authentication is not required to exploit this vulnerability. REFERENCE LINKS: IBM Security Alert Secunia Advisory: SA44030 ZDI Advisory: ZDI-11-115 IBM solidDB Support IMPACT ASSESSMENT: Medium Discussion: The specific flaw exists within the solid.exe process which listens by default on TCP ports 1315, 1964 and 2315. The authentication protocol

99

U-188: MySQL User Login Security Bypass and Unspecified Vulnerability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: MySQL User Login Security Bypass and Unspecified 8: MySQL User Login Security Bypass and Unspecified Vulnerability U-188: MySQL User Login Security Bypass and Unspecified Vulnerability June 12, 2012 - 7:00am Addthis PROBLEM: A security issue and vulnerability have been reported in MySQL PLATFORM: MySQL 5.x ABSTRACT: An error when verifying authentication attempts can be exploited to bypass the authentication mechanism. Reference LINKS: Original Advisory CVE-2012-2122 Secunia Advisory 49409 IMPACT ASSESSMENT: High Discussion: Successful exploitation of this vulnerability requires MySQL to be built on a system with a library that allows "memcmp()" to return a value outside of the -128 through 127 range (e.g. sse-optimized glibc). NOTE: Vendor binaries are reportedly not affected. The security issue is reported in versions prior to 5.1.63 and 5.5.25.

100

V-197: Adobe ColdFusion 10 WebSockets Security Bypass Vulnerability |  

NLE Websites -- All DOE Office Websites (Extended Search)

7: Adobe ColdFusion 10 WebSockets Security Bypass Vulnerability 7: Adobe ColdFusion 10 WebSockets Security Bypass Vulnerability V-197: Adobe ColdFusion 10 WebSockets Security Bypass Vulnerability July 11, 2013 - 6:00am Addthis PROBLEM: A vulnerability has been reported in Adobe ColdFusion PLATFORM: The vulnerability is reported in version 10 for Windows, Macintosh, and Linux ABSTRACT: The vulnerability is caused due to an unspecified error and can be exploited to invoke public methods on ColdFusion Components (CFC) using WebSockets REFERENCE LINKS: Secunia Advisory SA54024 Adobe Security Bulletin APSB13-19 Stackoverflow.com CVE-2013-3350 IMPACT ASSESSMENT: High DISCUSSION: The hotfix resolves a vulnerability that could permit an attacker to invoke public methods on ColdFusion Components (CFC) using WebSockets IMPACT: Security Bypass

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

V-162: Apache Struts "ParameterInterceptor" Security Bypass Vulnerability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Apache Struts "ParameterInterceptor" Security Bypass 2: Apache Struts "ParameterInterceptor" Security Bypass Vulnerability V-162: Apache Struts "ParameterInterceptor" Security Bypass Vulnerability May 23, 2013 - 6:00am Addthis PROBLEM: A vulnerability has been reported in Apache Struts PLATFORM: The vulnerability is reported in versions prior to 2.3.14.1 ABSTRACT: A vulnerability has been reported in Apache Struts, which can be exploited by malicious people to bypass certain security restrictions. REFERENCE LINKS: Secunia Advisory SA53495 Apache Struts Advisory S2-012 Apache Struts Advisory S2-013 CVE-2013-1965 CVE-2013-1966 IMPACT ASSESSMENT: High DISCUSSION: A request that included a specially crafted request parameter could be used to inject arbitrary OGNL code into the stack, afterward used as request

102

V-077: Barracuda SSL VPN Bug Lets Remote Users Bypass Authentication |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Barracuda SSL VPN Bug Lets Remote Users Bypass 7: Barracuda SSL VPN Bug Lets Remote Users Bypass Authentication V-077: Barracuda SSL VPN Bug Lets Remote Users Bypass Authentication January 25, 2013 - 6:00am Addthis PROBLEM: A vulnerability was reported in Barracuda SSL VPN. PLATFORM: The vulnerability has been verified to exist in Barracuda SSL VPN version 2.2.2.203 ABSTRACT: A remote user can gain administrative access to the target system. REFERENCE LINKS: SecurityTracker Alert ID: 1028039 Barracuda Networks Advisory IMPACT ASSESSMENT: High DISCUSSION: A remote user can set a specially crafted Java system property (via 'setSysProp.jsp') to bypass access restrictions and gain access to the API functionality. This can be exploited to download configuration files, download database dumps, shutdown the system, and set new administrative

103

Experimental and Analytic Study on the Core Bypass Flow in a Very High Temperature Reactor  

SciTech Connect

Core bypass flow has been one of key issues in the very high temperature reactor (VHTR) design for securing core thermal margins and achieving target temperatures at the core exit. The bypass flow in a prismatic VHTR core occurs through the control element holes and the radial and axial gaps between the graphite blocks for manufacturing and refueling tolerances. These gaps vary with the core life cycles because of the irradiation swelling/shrinkage characteristic of the graphite blocks such as fuel and reflector blocks, which are main components of a core's structure. Thus, the core bypass flow occurs in a complicated multidimensional way. The accurate prediction of this bypass flow and counter-measures to minimize it are thus of major importance in assuring core thermal margins and securing higher core efficiency. Even with this importance, there has not been much effort in quantifying and accurately modeling the effect of the core bypass flow. The main objectives of this project were to generate experimental data for validating the software to be used to calculate the bypass flow in a prismatic VHTR core, validate thermofluid analysis tools and their model improvements, and identify and assess measures for reducing the bypass flow. To achieve these objectives, tasks were defined to (1) design and construct experiments to generate validation data for software analysis tools, (2) determine the experimental conditions and define the measurement requirements and techniques, (3) generate and analyze the experimental data, (4) validate and improve the thermofluid analysis tools, and (5) identify measures to control the bypass flow and assess its performance in the experiment.

Richard Schultz

2012-04-01T23:59:59.000Z

104

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 5020 of 28,560 results. 11 - 5020 of 28,560 results. Download EIS-0287: Notice of Preferred Sodium Bearing Waste Treatment Technology Idaho High-Level Waste (HLW) and Facilities Disposition http://energy.gov/nepa/downloads/eis-0287-notice-preferred-sodium-bearing-waste-treatment-technology Download EA-1544: Finding of No Significant Impact Anadarko/Veritas Salt Creek 3D Seismic Project, Wyoming http://energy.gov/nepa/downloads/ea-1544-finding-no-significant-impact Download EA-1262: Final Environmental Assessment McKay Bypass Canal Extension http://energy.gov/nepa/downloads/ea-1262-final-environmental-assessment Rebate Animal Agriculture Compliance Act (Iowa) Sections of this chapter (311-312) describe the minimum manure management requirements to be followed by owners of livestock confinement feeding

105

V-057: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: eXtplorer "ext_find_user()" Authentication Bypass 7: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability V-057: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability December 28, 2012 - 6:00am Addthis PROBLEM: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability PLATFORM: eXtplorer 2.x ABSTRACT: A vulnerability has been reported in eXtplorer, which can be exploited by malicious people to bypass certain security restrictions. REFERENCE LINKS: Secunia Advisory SA51636 eXtplorer 2.1.3 Security Release IMPACT ASSESSMENT: Medium DISCUSSION: eXtplorer was notified of a problem within the authentication system of eXtplorer Versions 2.1.2, 2.1.1, 2.1.0 and 2.1.0RC5 that have been found to be vulnerable to an authentication bypass bug. IMPACT: An error within the "ext_find_user()" function in users.php can be

106

Horizontal well taps bypassed Dundee oil in Crystal field, Mich.  

SciTech Connect

The Dundee formation (Middle Devonian) has yielded more oil than any other producing interval in Michigan. The Dundee trend, which forms an east-west band across the central Michigan basin, consists of 137 fields which together have yielded more than 350 million bbl of oil. The first commercial Dundee production was established at Mt. Pleasant field in 1928, and most Dundee fields were discovered and brought on production during the 1930s--40s. Wells in many of the fields had very high initial production (IP) rates. IPs in excess of 1,000 b/d of oil were common, with values as high as 9,000 b/d reported. These high flow rates, combined with a thin (10--30 ft) oil column and a strong water drive, resulted in water coning that left significant volumes of oil unrecovered in some fields. One such field, Crystal field in Montcalm County, is the focus of a US Department of energy (DOE) Class 2 Reservoir Demonstration Project designed to demonstrate that horizontal drilling can recover significant volumes of this bypassed oil. The paper describes the demonstration project, regional setting, and the history of the Crystal field.

Wood, J.R.; Allan, J.R.; Huntoon, J.E.; Pennington, W.D. [Michigan Technological Univ., Houghton, MI (United States); Harrison, W.B. III [Western Michigan Univ., Kalamazoo, MI (United States); Taylor, E.; Tester, C.J. [Cronus Development Corp., Traverse City, MI (United States)

1996-10-21T23:59:59.000Z

107

Energy Landscapes: Coal Canals, Oil Pipelines, Electricity Transmission Wires in the Mid-Atlantic, 1820-1930.  

E-Print Network (OSTI)

??Coal canals, oil pipelines, and electricity transmission wires transformed the built environment of the American mid-Atlantic region between 1820 and 1930. By transporting coal, oil,… (more)

Jones, Christopher F.

2009-01-01T23:59:59.000Z

108

Short cut for Japan's oil. [Canal across Thailand's Kra Isthmus  

SciTech Connect

Dependence of Japan, Thailand, and other countries in the area on oil and LNG imports from the Middle East has led to a reexamination of a long-standing idea to build a canal across Thailand's Kra Isthmus. Besides relieving congestion in shipping lanes around Singapore, it would contribute significantly to the economic development of southern Thailand and reduce transport costs of vital fuel supplies. Such a canal project could result in further economies from greater ship use and would entirely change the maritime map of Southeast Asia, as a number of important ports of call for world shipping which lie between Arabian and Northeast Pacific waters are too small for the giant tankers. In spite of the fact that various surveys were conducted jointly by Japanese and Thai authorities to choose the optimum location for the canal, the project appears to be shelved for the time being, owing to very heavy investments and various other factors involved. (MCW)

1976-11-01T23:59:59.000Z

109

Oil Bypass Filter Technology Evaluation, Fourth Quarterly Report, July--September 2003  

Science Conference Proceedings (OSTI)

This fourth Oil Bypass Filter Technology Evaluation report details the ongoing fleet evaluation of an oil bypass filter technology by the Idaho National Engineering and Environmental Laboratory (INEEL) for the U.S. Department of Energy’s FreedomCAR & Vehicle Technologies Program. Eight four-cycle diesel-engine buses used to transport INEEL employees on various routes have been equipped with oil bypass filter systems from the puraDYN Corporation. The bypass filters are reported to have engine oil filtering capability of miles. This represents an avoidance of 21 oil changes, which equates to 740 quarts (185 gallons) of oil not used or disposed of. To validate the extended oil-drain intervals, an oil-analysis regime evaluates the fitness of the oil for continued service by monitoring the presence of necessary additives, undesirable contaminants, and engine-wear metals. For bus 73450, higher values of iron have been reported, but the wear rate ratio (parts per million of iron per thousand miles driven) has remained consistent. In anticipation of also evaluating oil bypass systems on six Chevrolet Tahoe sport utility vehicles, the oil is being sampled on each of the Tahoes to develop a characterization history or baseline for each engine.

James E. Francfort; Larry Zirker

2003-11-01T23:59:59.000Z

110

Development of improved methods for locating large areas of bypassed oil in Louisiana. Final report  

SciTech Connect

The primary objective of the project was to develop a predictive method for locating Pockets of bypassed mobile oil and estimating the volume of this resource. A secondary objective of the project was to transfer the learned technology to small independent operators who drill a majority of the domestic wells but lack access to a research staff. Another objective was to develop a format for compiling data on Louisiana reservoirs in a form that can be used by government and industry to evaluate the resource and plan future activities. The format developed will be demonstrated using data compiled in the bypassed oil study for selected reservoirs. The project was being funded over a three-year period and was jointly funded by the DOE and the state of Louisiana. The objectives of the project were accomplished using an interdisciplinary approach which included the disciplines of engineering, geology, and computer science. The work was organized into the following major tasks: Selection of reservoirs for study of bypassed oil potential; development of improved reservoir simulator for bypassed oil prospecting; an interdisciplinary reservoir characterization study of Louisiana reservoirs; active modelling of bypassed oil for three Louisiana reservoirs; and technology transfer activities.

Bourgoyne, A.T. Jr.; Kimbrell, C.

1994-07-01T23:59:59.000Z

111

Removal action report on the Building 3001 canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

Oak Ridge National Laboratory (ORNL) is a federal facility managed by Lockheed Martin C, Energy Research, Inc., for the U.S. Department of Energy (DOE). ORNL on the Oak Ridge Reservation in East Tennessee at the Anderson and Roane County lines, approximately 38 km (24 miles) west of Knoxville, Tennessee, and 18 km (11 miles) southwest of downtown Oak Ridge. The Oak Ridge Graphite Reactor and its storage and transfer canal are located in Bldg. 3001 in the approximate center of Waste Area Grouping I in the ORNL main complex. 4:1 The Bldg. 3001 Storage Canal is an L-shaped, underground, reinforced-concrete structure running from the back and below the Graphite Reactor in Bldg. 3001 to a location beneath a hot cell in the adjacent Bldg. 3019. The Graphite Reactor was built in 1943 to produce small quantities of plutonium and was subsequently used to produce other isotopes for medical research before it was finally shut down in 1963. The associated canal was used to transport, under water, spent fuel slugs and other isotopes from the back of the reactor to the adjacent Bldg. 31319 hot cell for further processing. During its operation and years subsequent to operation, the canal`s concrete walls and floor became contaminated with radioisotopes from the water.This report documents the activities involved with replacing the canal water with a solid, controlled, low-strength material (CLSM) in response to a Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action.

NONE

1997-05-01T23:59:59.000Z

112

Development of an artificial neural network-based software for prediction of power plant canal water discharge temperature  

Science Conference Proceedings (OSTI)

Power plant cooling water systems that interact with nearby effluents are complex non-linear, large-time-delay systems. A neural network-based software tool was developed for prediction of the canal water discharge temperature at a coal-fired power plant ... Keywords: Canal water thermal discharge, Neural networks, Power plants

Carlos E. Romero; Jiefeng Shan

2005-11-01T23:59:59.000Z

113

Canal Wave Oscillations from the I-84 Bridge Expansion in Boise, Idaho William Rahmeyer, Ph.D., P.E.*  

E-Print Network (OSTI)

Canal Wave Oscillations from the I-84 Bridge Expansion in Boise, Idaho By William Rahmeyer, Ph-84 Bridge crossing of the New York Canal in Boise, Idaho have increased the number of bridge columns oscillations. #12;Rahmeyer, Clegg, Barfuss 2 INTRODUCTION AND BACKGROUND As part of the Idaho Transportation

Rahmeyer, William J.

114

V-234: EMC RSA Archer GRC Open Redirection Weakness and Security Bypass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: EMC RSA Archer GRC Open Redirection Weakness and Security 4: EMC RSA Archer GRC Open Redirection Weakness and Security Bypass Security Issue V-234: EMC RSA Archer GRC Open Redirection Weakness and Security Bypass Security Issue September 4, 2013 - 6:00am Addthis PROBLEM: A weakness and a security issue have been reported in EMC RSA Archer GRC PLATFORM: EMC RSA Archer GRC 5.x ABSTRACT: This fixes multiple vulnerabilities, which can be exploited to bypass certain security restrictions and to conduct spoofing attacks REFERENCE LINKS: Secunia Advisory SA54717 SecurityTracker Alert ID 1028971 EMC Identifier: ESA-2013-057 CVE-2013-3276 CVE-2013-3277 IMPACT ASSESSMENT: Medium DISCUSSION: 1) The application does not properly restrict deactivated users. This can be exploited by deactivated users to login and gain access to otherwise

115

T-536: Cisco ASA Multiple Flaws Let Remote Users Deny Service and Bypass  

NLE Websites -- All DOE Office Websites (Extended Search)

36: Cisco ASA Multiple Flaws Let Remote Users Deny Service and 36: Cisco ASA Multiple Flaws Let Remote Users Deny Service and Bypass Security Controls T-536: Cisco ASA Multiple Flaws Let Remote Users Deny Service and Bypass Security Controls January 18, 2011 - 2:30pm Addthis PROBLEM: Cisco ASA Multiple Flaws Let Remote Users Deny Service and Bypass Security Controls. PLATFORM: Cisco 5500 Series Adaptive Security Appliances (ASA) ABSTRACT: Cisco ASA 5500 Series Adaptive Security Appliances are affected by multiple vulnerabilities. Affected versions of Cisco ASA Software vary depending on the specific vulnerability. Cisco ASA 5500 Series Adaptive Security Appliances may experience a TCP connection exhaustion condition (no new TCP connections are accepted) that can be triggered through the receipt of specific TCP segments during the

116

Oil Bypass Filter Technology Evaluation Ninth Quarterly Report October–December 2004  

SciTech Connect

This Oil Bypass Filter Technology Evaluation quarterly report (October–December 2004) details the ongoing fleet evaluation of oil bypass filter technologies being conducted by the Idaho National Laboratory (INL; formerly Idaho National Engineering and Environmental Laboratory) for the U.S. Department of Energy’s FreedomCAR & Vehicle Technologies Program. Eight INL four-cycle diesel-engine buses used to transport INL employees on various routes and six INL Chevrolet Tahoes with gasoline engines are equipped with oil bypass filter systems from the puraDYN Corporation. This quarter, three additional buses were equipped with bypass filters from Refined Global Solutions. Oil bypass filters are reported to have an engine oil filtering capability of less than 1 micron. Both the puraDYN and Refined Global Solutions bypass filters have a heating chamber to remove liquid contaminate from the oil. During the quarter, the eleven diesel engine buses traveled 62,188 miles, and as of January 3, 2005 the buses had accumulated 643,036 total test miles. Two buses had their engine oil changed this quarter. In one bus, the oil was changed due to its degraded quality as determined by a low total base number (<3.0 mg KOH/g). The other bus had high oxidation and nitration numbers (>30.0 Abs/cm). Although a total of six buses have had their oil changed during the last 26 months, by using the oil bypass filters the buses in the evaluation avoided 48 oil changes, which equates to 1,680 quarts (420 gallons) of new oil not consumed and 1,680 quarts of waste oil not generated. Therefore, over 80% of the oil normally required for oil-changes was not used, and, consequently, the evaluation achieved over 80% reduction in the amount of waste oil normally generated. The six Tahoe test vehicles traveled 39,514 miles, and as of January 3, 2005 the Tahoes had accumulated 189,970 total test miles. The Tahoe filter test is in transition. To increase the rate of bypass filter oil flow on the Tahoes, puraDYN provided a larger orifice assembly, and these are being changed out as the Tahoes come in for regular service.

Larry Zirker; James Francfort; Jordan Fielding

2005-02-01T23:59:59.000Z

117

EFFECTS OF GRAPHITE SURFACE ROUGHNESS ON BYPASS FLOW COMPUTATIONS FOR AN HTGR  

SciTech Connect

Bypass flow in a prismatic high temperature gas reactor (HTGR) occurs between graphite blocks as they sit side by side in the core. Bypass flow is not intentionally designed to occur in the reactor, but is present because of tolerances in manufacture, imperfect installation and expansion and shrinkage of the blocks from heating and irradiation. It is desired to increase the knowledge of the effects of such flow, which has been estimated to be as much as 20% of the total helium coolant flow. Computational fluid dynamic (CFD) simulations can provide estimates of the scale and impacts of bypass flow. Previous CFD calculations have examined the effects of bypass gap width, level and distribution of heat generation and effects of shrinkage. The present contribution examines the effects of graphite surface roughness on the bypass flow for different relative roughness factors on three gap widths. Such calculations should be validated using specific bypass flow measurements. While such experiments are currently underway for the specific reference prismatic HTGR design for the next generation nuclear plant (NGNP) program of the U. S. Dept. of Energy, the data are not yet available. To enhance confidence in the present calculations, wall shear stress and heat transfer results for several turbulence models and their associated wall treatments are first compared for flow in a single tube that is representative of a coolant channel in the prismatic HTGR core. The results are compared to published correlations for wall shear stress and Nusselt number in turbulent pipe flow. Turbulence models that perform well are then used to make bypass flow calculations in a symmetric onetwelfth sector of a prismatic block that includes bypass flow. The comparison of shear stress and Nusselt number results with published correlations constitutes a partial validation of the CFD model. Calculations are also compared to ones made previously using a different CFD code. Results indicate that increasing surface roughness increases the maximum fuel and helium temperatures as do increases in gap width. However, maximum coolant temperature variation due to increased gap width is not changed by surface roughness.

Rich Johnson; Yu-Hsin Tung; Hiroyuki Sato

2011-07-01T23:59:59.000Z

118

Natural or internal selection? the case of canalization in complex evolutionary systems  

Science Conference Proceedings (OSTI)

Using biological examples and theoretical arguments, the case is presented for extending the notion of natural selection to include internal selection in order to account for the evolution of complex systems. It is suggested that we take into consideration ... Keywords: Canalization, cognition, complexity, epigenesis, evolution, progress, selection

Alexander Riegler

2008-07-01T23:59:59.000Z

119

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Harlingen Irrigation District Cameron County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for each of the four components of the proposed project (i.e., canal meters and telemetry equipment, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for each of the four components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $31.37 per ac-ft and energy savings are measured at an aggregate value of $0.0002253 per BTU (i.e., $0.769 per kwh). In addition, expected values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $26.87 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0001603 per BTU ($0.547 per kwh). The amount of initial construction costs per dollar of total annual economic savings is estimated to be -1.30.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2002-10-01T23:59:59.000Z

120

U-244: McAfee Email Gateway Lets Remote Users Bypass Authentication and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: McAfee Email Gateway Lets Remote Users Bypass Authentication 4: McAfee Email Gateway Lets Remote Users Bypass Authentication and Conduct Cross-Site Scripting and Directory Traversal Attacks U-244: McAfee Email Gateway Lets Remote Users Bypass Authentication and Conduct Cross-Site Scripting and Directory Traversal Attacks August 27, 2012 - 7:00am Addthis PROBLEM: McAfee Email Gateway Lets Remote Users Bypass Authentication and Conduct Cross-Site Scripting and Directory Traversal Attacks PLATFORM: McAfee Email Gateway (MEG) 7.0.0 and 7.0.1 (MEG 6.7.x is NOT affected.) McAfee Email and Web Security (EWS) 5.6 Patch 3 and earlier McAfee Email and Web Security (EWS) 5.5 Patch 6 and earlier ABSTRACT: Several vulnerabilities were reported in McAfee Email Gateway. reference LINKS: McAfee Security Bulletin ID: SB10026 SecurityTracker Alert ID: 1027444

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

V-190: ASUS RT-N66U Router AiCloud Security Bypass Security Issue |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: ASUS RT-N66U Router AiCloud Security Bypass Security Issue 0: ASUS RT-N66U Router AiCloud Security Bypass Security Issue V-190: ASUS RT-N66U Router AiCloud Security Bypass Security Issue July 2, 2013 - 12:38am Addthis PROBLEM: ASUS RT-N66U Router AiCloud Security Bypass Security Issue PLATFORM: ASUS RT-N66U Router firmware versions 3.0.0.4.270 and 3.0.0.4.354. ABSTRACT: A security issue in ASUS RT-N66U Router has been reported REFERENCE LINKS: Secunia Advisory SA53931 neohapsis IMPACT ASSESSMENT: Medium DISCUSSION: The security issue is caused due to the device not properly restricting access when processing certain HTTPS requests and can be exploited to gain access to otherwise restricted functionality and e.g. disclose the contents of arbitrary files and directories. Successful exploitation requires the AiCloud web service to be enabled.

122

U-244: McAfee Email Gateway Lets Remote Users Bypass Authentication and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44: McAfee Email Gateway Lets Remote Users Bypass Authentication 44: McAfee Email Gateway Lets Remote Users Bypass Authentication and Conduct Cross-Site Scripting and Directory Traversal Attacks U-244: McAfee Email Gateway Lets Remote Users Bypass Authentication and Conduct Cross-Site Scripting and Directory Traversal Attacks August 27, 2012 - 7:00am Addthis PROBLEM: McAfee Email Gateway Lets Remote Users Bypass Authentication and Conduct Cross-Site Scripting and Directory Traversal Attacks PLATFORM: McAfee Email Gateway (MEG) 7.0.0 and 7.0.1 (MEG 6.7.x is NOT affected.) McAfee Email and Web Security (EWS) 5.6 Patch 3 and earlier McAfee Email and Web Security (EWS) 5.5 Patch 6 and earlier ABSTRACT: Several vulnerabilities were reported in McAfee Email Gateway. reference LINKS: McAfee Security Bulletin ID: SB10026 SecurityTracker Alert ID: 1027444

123

Brief paper: Output tracking of continuous bioreactors through recirculation and by-pass  

Science Conference Proceedings (OSTI)

In this paper, we propose to regulate the output of an auto-catalytic bioprocess (a biological process associated with a growth of a micro-organism) by means of a recirculation loop and by-pass. We give conditions on the volume of the reactor and the ... Keywords: Continuous bioreactor, Nonlinear control design, Output regulation, Recirculation loop

Jérôme Harmand; Alain Rapaport; Frédéric Mazenc

2006-06-01T23:59:59.000Z

124

MHK Projects/GCK Technology Cape Cod Canal MA US | Open Energy Information  

Open Energy Info (EERE)

GCK Technology Cape Cod Canal MA US GCK Technology Cape Cod Canal MA US < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.7433,"lon":-70.6093,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

125

Evaluation of closure alternatives for the Building 3001 Storage Canal at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

The Bldg. 3001 Storage Canal at ORNL is leaking approximately 400 gal of water per day. This report presents the Bechtel National Inc. (BNI) Team's evaluation of plans and presents recommendations for interim closure alternatives to stop the release of radionuclides and potential release of heavy metals into the environment. This is a conceptual evaluation and does not include detailed engineering of physical mitigation methods. The alternatives address only interim closure measures and not final decommissioning of the canal.

Not Available

1992-02-01T23:59:59.000Z

126

Advanced Electromagnetic Inspection Methods for Fuel Pool and Transfer Canal Liners  

Science Conference Proceedings (OSTI)

Liner leakage is prevalent in spent fuel pools (SPFs) and transfer canals, with some plants experiencing leakage since early in plant life. Leakage concerns are more critical in the pressurized water reactor (PWR) fleet due to the undesirable consequences that can be encountered with the release of boron. These can include, but are not limited to, (1) degradation of the reinforced concrete and rebar that form the pool structure and (2) uncontrolled release of radioactive nuclides that have the potential ...

2012-07-30T23:59:59.000Z

127

Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April- June 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

651 651 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April-June 2005 TECHNICAL REPORT Larry Zirker James Francfort Jordan Fielding September 2005 Idaho National Laboratory Operated by Battelle Energy Alliance INL/EXT-05-00651 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Eleventh Quarterly Report April-June 2005 Larry Zirker James Francfort Jordan Fielding September 2005 Idaho National Laboratory Transportation Technology Department Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Assistant Secretary for Energy Efficiency and Renewable Energy Under DOE Idaho Operations Office

128

Cholinergic interneurons around the central canal in adult intact and spinal cord transected rats are activated in response to load-bearing stepping  

E-Print Network (OSTI)

lamina X have bilateral projections [44]. Partition neuronsin lamina VII with projections from the central canal to thelabel muscle-specific sensory projections and motoneurons as

Duru, Paul Okwudiri

2013-01-01T23:59:59.000Z

129

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Edinburg Irrigation District Hidalgo County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along the "Curry Main" and multi-size pipeline replacing a segment of delivery canal along the "North Branch / East Main"). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for both components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $29.87 per ac-ft and energy savings are measured at an aggregate value of $0.0000595 per BTU (i.e., $0.203 per kwh). In addition, expected values are indicated for the Bureau of Reclamation's three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $50.90 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0000777 per BTU ($0.265 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -2.01.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2002-11-01T23:59:59.000Z

130

Comprehensive work plan for Building 3001 storage canal at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This Comprehensive Work Plan describes the method of accomplishment to replace the shielding protection of the water in the canal with a controlled low strength material (CLSM) 4. The canal was used during the operation of the Oak Ridge Graphite Reactor in the 1940s and 1950s to transport spent fuel slugs and irradiated test materials from the reactor, under water to the hot cell in Building 3019 for further processing, packaging, and handling. After the reactor was shut down, the canal was used until 1990 to store some irradiated materials until they could be transferred to a Solid Waste Storage Area. This task has the following objectives and components: (1) minimize potential future risk to human health and the environment; (2) reduce surveillance and maintenance cost of the canal; (3) perform site preparation activities; (4) replace the water in the canal with a solid CLSM; (5) pump the water to the Process Waste Treatment System (PWTS) for further processing at the same rate that the CLSM is pumped under the water; (6) remove the water using a process that will protect the workers and the public in the visitors area from contamination while the CLSM is being pumped underneath the water; (7) painting a protective coating material over the CLSM after the CLSM has cured.

NONE

1997-01-01T23:59:59.000Z

131

Closure of a unique mixed waste storage canal at the Dept. of Energy`s Oak Ridge National Laboratory (ORNL)  

Science Conference Proceedings (OSTI)

At the Department of Energy`s (DOE`s) Oak Ridge National Laboratory (ORNL) a unique closure was accomplished for a storage canal that contained both hazardous chemical contaminants controlled by the Resource Conservation and Recovery Act (RCRA), and radioactive contaminants controlled by the Atomic Energy Act (AEA). During 1991 and 1992, after approvals were received from the DOE and the Tennessee Department of Environment and Conservation (TDEC), subcontractors to DOE`s Construction Manager were mobilized and remote controlled equipment was operated on site to remove the RCRA and radioactive contamination (referred to hereafter as mixed wastes) from the 3001 Storage Canal at ORNL. After numerous {open_quotes}surprises{close_quotes} during the removal activities, each requiring problem resolution and approvals from DOE and TDEC, the canal closure was completed in September 1992 and final closure certification was submitted to TDEC in October 1992. The following discussion describes the learning experiences that ORNL and DOE acquired from a RCRA closure project for a mixed waste storage canal containing high radiation levels. The project was successful, especially since worker exposures were minimized, but was lengthy, requiring 30 months from notification of a leak in the canal until final demobilization of the subcontractor, and expensive to complete (total overall cost of $3 million).

Greer, J.K. Jr.; Etheridge, J.T.; Thompson, W.T.

1994-09-01T23:59:59.000Z

132

A Fisheries Evaluation of the Westside Ditch and Town Canal Fish Screening Facilities, Spring 1990.  

DOE Green Energy (OSTI)

The Pacific Northwest Laboratory (PNL) evaluated the effectiveness of new fish screening facilities in the Westside Ditch and Town Canal, near Ellensburg, in south-central Washington State. At the Town Canal, we estimated that 0.3% of steelhead Oncorhynchus mykiss smolts released during tests were significantly descaled. The time required for 50% of the fish in the two steelhead test groups to exit from the Town Screens forebay ranged from 12 h to >85 h. Integrity tests at the Town Screens indicated that none of the rainbow trout fry released in front of the rotary drum screens passed through the screens, although 8.5% of the native zero-age chinook salmon fry diverted from the river into the screening facility were lost through the screens. At the Westside Screens, 16.8% of native zero-age chinook salmon fry passed through the screens. Most of the chinook salmon lost through the screens were small, <36 mm long. The methods used in 1990 were first used at the Sunnyside Screens in 1985. These methods were used again in subsequent years in tests at the Richland, Toppenish/Satus, Wapato, and Toppenish Creek screens. The methods used from 1985 through 1989 have been reviewed by the Washington State Department of Fisheries, US Fish and Wildlife Service, National Marine Fisheries Service, Northwest Power Planning Council, and Yakima Indian Nation. 14 refs., 12 figs., 7 tabs.

Neitzel, Duane A.; Abernethy, C. Scott; Hartenson, Gregg A.

1990-11-01T23:59:59.000Z

133

A fisheries evaluation of the Wapato, Sunnyside, and Toppenish Creek canal fish screening facilities, spring 1988  

DOE Green Energy (OSTI)

The Bonneville Power Administration, the United States Bureau of Reclamation, and the Washington State Department of Ecology are funding the construction and evaluation of fish passage and protection facilities at irrigation and hydroelectric diversions in the Yakima River Basin, Washington State. The programs provide offsite enhancement to compensate for fish and wildlife losses caused by hydroelectric development throughout the Columbia River Basin and address natural propagation of salmon to help mitigate the impact of irrigation in the Yakima River Basin. The Wapato, Sunnyside, and Toppenish Creek Screens are three of the facilities in the basin. This report evaluates the effectiveness of the screens in intercepting and returning juvenile salmonids unharmed to the river from which they were diverted. We evaluated the effectiveness of new screening facilities at the Toppenish Creek, Wapato, and Sunnyside canals in southcentral Washington State. Screen integrity tests indicated that fish released in front of the screens were prevented from entering the canal behind the screens. We conducted descaling tests at the Toppenish Creek Screens. We measured the time required for fish to move through the screen facilities. Methods used in 1988 were the same as those used at Sunnyside in 1985 and in subsequent years at Richland. Toppenish/Satus, and Wapato. 11 refs., 11 figs., 14 tabs.

Neitzel, D.A.; Abernethy, C.S.; Lusty, E.W.

1990-03-01T23:59:59.000Z

134

CFD Analysis of Core Bypass Flow and Crossflow in the Prismatic Very High Temperature Gas-cooled Nuclear Reactor  

E-Print Network (OSTI)

Very High Temperature Rector (VHTR) had been designated as one of those promising reactors for the Next Generation (IV) Nuclear Plant (NGNP). For a prismatic core VHTR, one of the most crucial design considerations is the bypass flow and crossflow effect. The bypass flow occurs when the coolant flow into gaps between fuel blocks. These gaps are formed as a result of carbon expansion and shrinkage induced by radiations and manufacturing and installation errors. Hot spots may appear in the core if the large portion of the coolant flows into bypass gaps instead of coolant channels in which the cooling efficiency is much higher. A preliminary three dimensional steady-state CFD analysis was performed with commercial code STARCCM+ 6.04 to investigate the bypass flow and crossflow phenomenon in the prismatic VHTR core. The k-? turbulence model was selected because of its robustness and low computational cost with respect to a decent accuracy for varied flow patterns. The wall treatment used in the present work is two-layer all y+ wall treatment to blend the wall laws to estimate the shear stress. Uniform mass flow rate was chose as the inlet condition and the outlet condition was zero gauge pressure outlet. Grid independence study was performed and the results indicated that the discrepancy of the solution due to the mesh density was within 2% of the bypass flow fraction. The computational results showed that the bypass flow fraction was around 12%. Furthermore, the presence of the crossflow gap resulted in a up to 28% reduction of the coolant in the bypass flow gap while mass flow rate of coolant in coolant channels increased by around 5%. The pressure drop at the inlet due to the sudden contraction in area could be around 1kpa while the value was about 180 Pa around the crossflow gap region. The error analysis was also performed to evaluate the accumulated errors from the process of discretization and iteration. It was found that the total error was around 4% and the variation for the bypass flow fraction was within 1%.

Wang, Huhu 1985-

2012-12-01T23:59:59.000Z

135

Electrical and thermal finite element modeling of arc faults in photovoltaic bypass diodes.  

DOE Green Energy (OSTI)

Arc faults in photovoltaic (PV) modules have caused multiple rooftop fires. The arc generates a high-temperature plasma that ignites surrounding materials and subsequently spreads the fire to the building structure. While there are many possible locations in PV systems and PV modules where arcs could initiate, bypass diodes have been suspected of triggering arc faults in some modules. In order to understand the electrical and thermal phenomena associated with these events, a finite element model of a busbar and diode was created. Thermoelectrical simulations found Joule and internal diode heating from normal operation would not normally cause bypass diode or solder failures. However, if corrosion increased the contact resistance in the solder connection between the busbar and the diode leads, enough voltage potentially would be established to arc across micron-scale electrode gaps. Lastly, an analytical arc radiation model based on observed data was employed to predicted polymer ignition times. The model predicted polymer materials in the adjacent area of the diode and junction box ignite in less than 0.1 seconds.

Bower, Ward Isaac; Quintana, Michael A.; Johnson, Jay

2012-01-01T23:59:59.000Z

136

Open cycle ocean thermal energy conversion steam control and bypass system  

DOE Patents (OSTI)

Two sets of hinged control doors for regulating motive steam flow from an evaporator to a condenser alternatively through a set of turbine blades in a steam bypass around the turbine blades. The evaporator has a toroidal shaped casing situated about the turbine's vertical axis of rotation and an outlet opening therein for discharging motive steam into an annular steam flow path defined between the turbine's radially inner and outer casing structures. The turbine blades extend across the steam flow path intermediate the evaporator and condenser. The first set of control doors is arranged to prevent steam access to the upstream side of the turbine blades and the second set of control doors acts as a bypass around the blades so as to maintain equilibrium between the evaporator and condenser during non-rotation of the turbine. The first set of control doors preferably extend, when closed, between the evaporator casing and the turbine's outer casing and, when open, extend away from the axis of rotation. The second set of control doors preferably constitute a portion of the turbine's outer casing downstream from the blades when closed and extend, when open, toward the axis of rotation. The first and second sets of control doors are normally held in the open and closed positions respectively by locking pins which may be retracted upon detecting an abnormal operating condition respectively to permit their closing and opening and provide steam flow from the evaporator to the condenser.

Wittig, J. Michael (West Goshen, PA); Jennings, Stephen J. (Radnor Township, Delaware County, PA)

1980-01-01T23:59:59.000Z

137

A Fisheries Evaluation of the Wapato, Sunnyside and Toppenish Creek Canal Fish Screening Facilities, Spring 1988 : Annual Report.  

DOE Green Energy (OSTI)

We evaluated the effectiveness of new screening facilities at the Toppenish Creek, Wapato, and Sunnyside canals in southcentral Washington State. Screen integrity tests indicated that fish released in front of the screens were prevented from entering the canal behind the screens. Screen efficiency estimates are 99% ({+-}0.6%) for Toppenish Creek, 99% ({+-}0.3%) for Wapato, and 98% ({+-}0.5%) for Sunnyside. During 1987 at the Wapato Canal, we estimated screen efficiency was 97% ({+-}l%). We conducted descaling tests at the Toppenish Creek Screens. We estimated that 0.2% of steelhead Qncorhynchus mykiss smelts released during tests were descaled. None of the fish released through the fish return pipe were descaled. We measured the time required for fish to move through the screen facilities. The time required for 50% of the test fish to exit the Toppenish Creek Screen forebay was 4 to 9 h for rainbow trout fry and up to 39 h for steelhead smelts. The time for 50% of the test fish to exit the Wapato and Sunnyside screen forebays was less than 8 h. As with past studies, exit times varied with canal flow and species. After 39 h at Toppenish Creek, half the steelhead smelts were still in the forebay when canal flows were 20 cfs. At Sunnyside, half the chinook salmon fry exited the forebay in 1 h or less. Methods used in 1988 were the same as those used at Sunnyside in 1985 and in subsequent years at Richland, Toppenish/Satus, and Wapato. The methods and previous results have been reviewed by the Washington State Department of Fisheries, U.S. Fish and Wildlife Service, National Marine Fisheries Service, Northwest Power Planning Council, and Yakima Indian Nation.

Neitzel, Duane A.; Abernethy, C. Scott; Lusty, E. William (Pacific Northwest Laboratory)

1990-03-01T23:59:59.000Z

138

Particle Image Velocimetry Measurements and Analysis of Bypass Data for a Scaled 6mm Gap  

SciTech Connect

The purpose of the fluid dynamics experiments in the MIR (Matched Index of-Refraction) flow system at Idaho National Laboratory (INL) is to develop benchmark databases for the assessment of Computational Fluid Dynamics (CFD) solutions of the momentum equations, scalar mixing, and turbulence models for the flow ratios between coolant channels and bypass gaps in the interstitial regions of typical prismatic standard fuel element (SFE) or upper reflector block geometries of typical Modular High-temperature Gas-cooled Reactors (MHTGR) in the limiting case of negligible buoyancy and constant fluid properties. The experiments will use optical techniques, primarily particle image velocimetry (PIV) in the INL Matched Index of Refraction (MIR) flow system.

J.R. Wolf; T.E. Conder; R.R. Schultz

2012-09-01T23:59:59.000Z

139

The spatial and temporal subsidence variability of the East Mesa Geothermal Field, California, USA, and its potential impact on the All American Canal System  

Science Conference Proceedings (OSTI)

The spatiotemporal variability of subsidence around the East Mesa Geothermal Field (EMGF) near the All American Canal (AAC) has been measured using 30 temporally averaged interferograms from 1992 to 2000. Deformation rate maps from two shorter time periods ...

Joo-Yup Han; R. R. Forster; D. E. Moser; A. L. J. Ford; J. Ramirez-Hernandez; K. F. Tiampo

2011-06-01T23:59:59.000Z

140

Focused risk assessment: Mound Plant, Miami-Erie Canal Operable Unit 4  

SciTech Connect

In 1969, an underground waste line at Mound Plant ruptured and released plutonium-238 in a dilute nitric acid solution to the surrounding soils. Most of the acid was neutralized by the native soils. The plutonium, which in a neutral solution is tightly sorbed onto clay particles, remained within the spill area. During remediation, a severe storm eroded some of the contaminated soil. Fine grained plutonium-contaminated clay particles were carried away through the natural drainage courses to the remnants of the Miami-Erie Canal adjacent to Mound Plant, and then into the Great Miami River. This focused risk assessment considers exposure pathways relevant to site conditions, including incidental ingestion of contaminated soils, ingestion of drinking water and fish, and inhalation of resuspended soils and sediments. For each potential exposure pathway, a simplified conceptual model and exposure scenarios have been used to develop conservative estimates of potential radiation dose equivalents and health risks. The conservatism of the dose and risk estimates provides a substantive margin of safety in assuring that the public health is protected.

Rogers, D.R.; Dunning, D.F.

1994-09-29T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Combined cycle electric power plant with a steam turbine having a sliding pressure main bypass and control valve system  

SciTech Connect

A combined cycle electric power plant includes two gas turbines, a steam turbine, and a digital control system with an operator analog or manual backup. Each of the gas turbines has an exhaust heat recovery steam generator connected to a common header from which the steam is supplied by one or both of the steam generators for operating the steam turbine. The control system is of the sliding pressure type and maintains a predetermined steam pressure as a function of steam flow according to a predetermined characterization depending on the number of steam generators in service to limit the maximum steam velocity through the steam generators, and reduce the probability of water carryover into the steam turbine. Such control is always maintained by the bypass valve. The turbine control valve responds to the speed/load demand only, except when the bypass valve is closed and the rate of steam generation is insufficient to maintain a predetermined pressure flow relationship.

Uram, R.

1980-05-06T23:59:59.000Z

142

U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Final Report  

SciTech Connect

This Oil Bypass Filter Technology Evaluation final report documents the feasibility of using oil bypass filters on 17 vehicles in the Idaho National Laboratory (INL) fleet during a 3-year test period. Almost 1.3 million test miles were accumulated, with eleven 4-cycle diesel engine buses accumulating 982,548 test miles and six gasoline-engine Chevrolet Tahoes accumulating 303,172 test miles. Two hundred and forty oil samples, taken at each 12,000-mile bus servicing event and at 3,000 miles for the Tahoes, documented the condition of the engine oils for continued service. Twenty-eight variables were normally tested, including the presence of desired additives and undesired wear metals such as iron and chrome, as well as soot, water, glycol, and fuel. Depending on the assumptions employed, the INL found that oil bypass filter systems for diesel engine buses have a positive payback between 72,000 and 144,000 miles. For the Tahoes, the positive payback was between 66,000 and 69,000 miles.

L. R. Zirker; J. E. Francfort; J. J. Fielding

2006-03-01T23:59:59.000Z

143

Integrated reservoir characterization of a Tulare steamflood finds bypassed oil - South Belridge Field, Kern County, California  

SciTech Connect

Reservoir quality and producibility are directly related to the characteristics of the depositional lithofacies. Electric log gamma ray/resistivity profiles were used to define facies trends within the Tulare steamflood at South Belridge. Channel and non-channel facies profiles are distinctive across the lease with the channel sands having the better quality reservoir and greater net pay values. Sidewall core permeabilities were averaged over the main producing Tulare intervals with the channels averaging 2000-3000 millidarcies and non-channels 200-500 millidarcies. This supports the lithofacies trend and net pay maps. Although the approach is qualitative, it illustrates the dramatic permeability contrast between the channel and non-channel lithofacies. Temperature maps using downhole temperature surveys and flowline temperatures indicate channel facies temperatures up to 300[degrees] with the non-channel facies having 90[degrees] to 100[degrees] temperatures (near ambient). Higher temperatures also relate to higher average daily production rates for channel associated wells. Channel wells averaged greater than 30 BOPD while non-channel wells averaged 10 BOPD or less. New and replacement well nations have been high graded resulting in favorable production responses. Integration of the lithofacies, permeability and temperature data plus ongoing preventive production optimization work has led to a more efficient Tulare steamflood and identification of bypassed oil on the King-Ellis lease in the South Belridge Field.

Walter, D.R.; Wylie, A.S. Jr.; Broussard, K.A. (Santa Fe Energy Resources, Bakersfield, CA (United States))

1996-01-01T23:59:59.000Z

144

Locating and producing bypassed oil: A U.S. DOE project update  

SciTech Connect

Tidelands Oil Production Co. is conducting a Class 3 near-term waterflood project supported partially by the US Dept. of Energy (USDOE) titled Increasing Waterflood Reserves in the Wilmington Oil Field Through Improved Reservoir Characterization and Reservoir Management. The project takes place across Fault Blocks 4 and 5 of the Wilmington field, Long Beach, California. The objective of this U.S. DOE demonstration project is to increase waterflood reserves in slope and basin clastic reservoirs through improved methods of identifying sands containing oil bypassed by a waterflood and exploiting this oil by recompleting existing idle wells. Specific objectives include identifying sands containing high remaining-oil saturation by use of a multiple acoustic cased-hole logging tool, determining geophysical parameters for interpretation of the acoustic data, demonstrating and gaining experience with a short-radius lateral recompletion, optimizing standard and steam recompletion techniques, generating a three-dimensional (3D) geologic model, and transferring the developed technologies and methods to other operators of slope and basin clastic reservoirs. The paper discusses results to date on characterization, reservoir engineering, deterministic modeling, multiple acoustic logging, and recompletions.

NONE

1997-09-01T23:59:59.000Z

145

Prairie Canal Well No. 1, Calcasieu Parish, Louisiana. Volume 1. Completion and testing. Final report  

DOE Green Energy (OSTI)

The Prairie Canal Company, Inc. Well No. 1, approximately 8 miles south of the city of Lake Charles, Louisiana, was tested through the annulus between 5-1/2 inch casing and 2-3/8 inch tubing. The interval tested was from 14,782 to 14,820 feet. The geological section was the Hackberry Sand, a member of the Oligocene Frio formation. Produced water was injected into a disposal well which was perforated in several Miocene Sands from 3070 to 4600 feet. Original plans were to test a section of the Hackberry sand from 14,976 to 15,024 feet. This primary zone, however, produced a large amount of sand, shale, gravel, and rocks during early flow periods and was abandoned in favor of the secondary zone. Four pressure drawdown flow tests and three pressure buildup tests were conducted during a 12-day period. A total of 36,505 barrels of water was produced. The highest sustained flow rate was approximately 7100 BWPD. The gas-to-water ratio, measured during testing, ranged from 41 to 50 SCF/BBL. There is disagreement as to the saturation value of the reservoir brine, which may be between 43.3 and 49.7 SCF/BBL. The methane content of the flare line gas averaged 88.4 mole percent. The CO/sub 2/ content averaged 8.4 mole percent. Measured values of H/sub 2/S in the gas were between 12 and 24 ppM.

Not Available

1981-01-01T23:59:59.000Z

146

Juvenile Salmonid Pit-Tag Studies at Prosser Dam and the Chandler Canal Fish Collection Facility, Yakima River, 1991 and 1992 Final Report.  

DOE Green Energy (OSTI)

In 1991 and 1992, the National Marine Fisheries Service completed the second and third years of a 3-year study to estimate juvenile salmonid (Oncorhynchus spp.) timing and survival characteristics related to passage through the Prosser Dam complex, including the Chandler Canal and the Chandler fish collection facility, on the Yakima River. Yearling chinook (O. tshawyacha) and coho salmon (O. kisutch) were collected at the Chandler facility, PIT tagged, and released at various locations in the Yakima River, Chandler Canal, and the Chandler facility. Individual fish were subsequently detected at PIT-tag detection monitors at the Chandler facility and/or McNary Dam on the Columbia River. Survival through various reaches, PIT-tag detection efficiency, and Chandler Canal fish entrainment proportion parameters were estimated using maximum likelihood techniques. The research objectives in 1991 and 1992 were to: (1) assess the effects of passage through the Chandler Canal and the Chandler facility on the survival of juvenile salmonids, (2) determine the entrainment rate of juvenile salmonids into the Chandler Canal as a function of river flow, and (3) determine the efficiency and reliability of the PIT-tag monitoring system at the Chandler facility. The initial 1990 research plan was expanded in 1991 and 1992 to include several more release locations and many more release days.

Ruehle, Thomas E.; Sandford, Benjamin P.

1996-01-01T23:59:59.000Z

147

Use of nuclear explosives for excavation of a sea-level canal across the Negev Desert in Israel, connecting the Mediterranean with the Gulf of Aqaba  

SciTech Connect

Another interesting application of nuclear excavation would be a sea- level canal 160 miles long across Israel, connecting the Mediterranean with the Gulf of Aqaba (and thus the Red Sea and the Indian Ocean). Such a canal would be a strategically valuable alternate to the present Suez Canal and would probably contribute greatly to the economic development of the surrounding area. The difference in elevation between sea level and the Dead Sea (30 miles away and 1286 feet below sea level) might also be used to generate hydroelectric power. The maximum depth of excavation to be encountered is on the order of 1500 feet. Conventional methods of excavation of this magnitude are prohibitively expensive, if indeed possible, but it appears that nuclear explosives could be profitably applied to this situation.

Maccabee, H. D.

1965-07-01T23:59:59.000Z

148

A Fisheries Evaluation of the Westside Ditch and Wapato Canal Fish Screening Facilities, Spring 1989 : Annual Report.  

DOE Green Energy (OSTI)

We evaluated the effectiveness of new fish screening facilities in the Westside Ditch and Wapato Canal in south-central Washington State. The screen integrity tests indicated that test fish released in front of the screens could enter the canal behind the screens. At Westside Ditch, between 6% and 25% of the zero-age fry passed through the rotary drum screens. The 6% estimate is based on tests with rainbow trout Oncorhynchus mykiss fry. The 25% estimate is based on monitoring chinook salmon 0. tshawytscha fry that were diverted from the river into the irrigation ditch. At Westside Ditch, we estimated that 1.8% of steelhead 0. mykiss smolts and 0.3% of chinook salmon smolts released during tests were descaled. The time required for 50% of the test fish to exit from the Westside Ditch Screen forebay was 3 to 8 h for chinook salmon smolts and up to 28 h for steelhead smolts. Methods used in 1988 were first used at Sunnyside in 1985 and were used in subsequent years at Richland. Toppenish/Satus. Wapato. and Toppenish Creek. The methods and 1985 through 1987 results have been reviewed by the Washington State Department of Fisheries, U.S. Fish and Wildlife Service, National Marine Fisheries Service, Northwest Power Planning Council, and the Yakima Indian Nation.

Neitzel, Duana A.; Abernethy, C. Scott; Lusty, E. William

1990-06-01T23:59:59.000Z

149

PARTICLE IMAGE VELOCIMETRY MEASUREMENTS IN A REPRESENTATIVE GAS-COOLED PRISMATIC REACTOR CORE MODEL: FLOW IN THE COOLANT CHANNELS AND INTERSTITIAL BYPASS GAPS  

Science Conference Proceedings (OSTI)

Core bypass flow is one of the key issues with the prismatic Gas Turbine-Modular Helium Reactor, and it refers to the coolant that navigates through the interstitial, non-cooling passages between the graphite fuel blocks instead of traveling through the designated coolant channels. To determine the bypass flow, a double scale representative model was manufactured and installed in the Matched Index-of-Refraction flow facility; after which, stereo Particle Image Velocimetry (PIV) was employed to measure the flow field within. PIV images were analyzed to produce vector maps, and flow rates were calculated by numerically integrating over the velocity field. It was found that the bypass flow varied between 6.9-15.8% for channel Reynolds numbers of 1,746 and 4,618. The results were compared to computational fluid dynamic (CFD) pre-test simulations. When compared to these pretest calculations, the CFD analysis appeared to under predict the flow through the gap.

Thomas E. Conder; Richard Skifton; Ralph Budwig

2012-11-01T23:59:59.000Z

150

Bypassing the learning curve in permanent seed implants using state-of-the-art technology  

SciTech Connect

Purpose: The aim of this study was to demonstrate, based on clinical postplan dose distributions, that technology can be used efficiently to eliminate the learning curve associated with permanent seed implant planning and delivery. Methods and Materials: Dose distributions evaluated 30 days after the implant of the initial 22 consecutive patients treated with permanent seed implants at two institutions were studied. Institution 1 (I1) consisted of a new team, whereas institution 2 (I2) had performed more than 740 preplanned implantations over a 9-year period before the study. Both teams had adopted similar integrated systems based on three-dimensional (3D) transrectal ultrasonography, intraoperative dosimetry, and an automated seed delivery and needle retraction system (FIRST, Nucletron). Procedure time and dose volume histogram parameters such as D90, V100, V150, V200, and others were collected in the operating room and at 30 days postplan. Results: The average target coverage from the intraoperative plan (V100) was 99.4% for I1 and 99.9% for I2. D90, V150, and V200 were 191.4 Gy (196.3 Gy), 75.3% (73.0%), and 37.5% (34.1%) for I1 (I2) respectively. None of these parameters shows a significant difference between institutions. The postplan D90 was 151.2 Gy for I1 and 167.3 Gy for I2, well above the 140 Gy from the Stock et al. analysis, taking into account differences at planning, results in a p value of 0.0676. The procedure time required on average 174.4 min for I1 and 89 min for I2. The time was found to decrease with the increasing number of patients. Conclusion: State-of-the-art technology enables a new brachytherapy team to obtain excellent postplan dose distributions, similar to those achieved by an experienced team with proven long-term clinical results. The cost for bypassing the usual dosimetry learning curve is time, with increasing team experience resulting in shorter treatment times.

Beaulieu, Luc [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada)]. E-mail: beaulieu@phy.ulaval.ca; Evans, Dee-Ann Radford [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada); Aubin, Sylviane [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada); Angyalfi, Steven [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada); Husain, Siraj [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada); Kay, Ian [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada); Martin, Andre-Guy [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada); Varfalvy, Nicolas [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada); Vigneault, Eric [Departement de Radio-oncologie, Centre Hospitalier Universitaire de Quebec, Hotel-Dieu de Quebec, Quebec, PQ (Canada); Dunscombe, Peter [Departments of Radiation Oncology and Medical Physics, Tom Baker Cancer Centre, Calgary, AB (Canada)

2007-01-01T23:59:59.000Z

151

LOUIS J. RONSIVALLI, JOHN D. KAYLOR PHILIP J. McKAY, and CARMINE GORGA '  

E-Print Network (OSTI)

used in the Government- inspected system. The number of pro- cessors grew from one to eleven, and t plants that are under inspection. It is estimated that the size of the enterprise could be twice as large of seafoods at point of sale have been adequately discussed (Nickerson and Ronsivalli, 1979' Ron- sivalli et a

152

Bypass Flow Computations using a One-Twelfth Symmetric Sector For Normal Operation in a 350 MWth VHTR  

SciTech Connect

Significant uncertainty exists about the effects of bypass flow in a prismatic gas-cooled very high temperature reactor (VHTR). Bypass flow is the flow in the gaps between prismatic graphite blocks in the core. The gaps are present because of variations in their construction, imperfect installation and expansion and shrinkage from thermal heating and neutron fluence. Calculations are performed using computational fluid dynamics (CFD) for flow of the helium coolant in the gap and coolant channels along with conjugate heat generation and heat transfer in the fuel compacts and graphite. A commercial CFD code is used for all of the computations. A one-twelfth sector of a standard hexagonal block column is used for the CFD model because of its symmetry. Various scenarios are computed by varying the gap width from zero to 5 mm, varying the total heat generation rate to examine average and peak radial generation rates and variation of the graphite block geometry to account for the effects of shrinkage caused by irradiation. The calculations are for a 350 MWth prismatic reactor. It is shown that the effect of increasing gap width, while maintaining the same total mass flow rate, causes increased maximum fuel temperature while providing significant cooling to the near-gap region. The maximum outlet coolant temperature variation is increased by the presence of gap flow and also by an increase in total heat generation with a gap present. The effect of block shrinkage is actually to decrease maximum fuel temperature compared to a similar reference case.

Richard W. Johnson; Hiroyuki Sato

2010-10-01T23:59:59.000Z

153

Identification of tire leachate toxicants and a risk assessment of water quality effects using tire reefs in canals  

Science Conference Proceedings (OSTI)

Cover is important to aquatic habitat and fisheries often try to improve habitats by addition of natural and artificial material to improve cover diversity and complexity. Habitat-improvement programs range from submerging used Christmas trees to more complex programs. Used automobile tires have been employed in the large scale construction of reefs and fish attractors in marine environments and to a lesser extent in freshwater and have been recognized as a durable, inexpensive and long-lasting material benefiting fishery communities. Recent studies by the U.S. Bureau of Reclamation have quantified the importance of tire reefs to enhancing freshwater canal fisheries in the southwestern United States. These studies have demonstrated that fishes and aquatic macroinvertebrates are attracted to these structures, increasing species diversity, densities and biomass where reefs are placed in canals. However, the use of tire reefs in aquatic environments which have relatively small volumes compared to marine or reservoir environments has raised water quality concerns. Effects of tires on water quality have not typically been studied in the past because of the obvious presence of fishes and other aquatic organisms that make use of tire reefs; the implication being that tires are inert and non-toxic. Little information on effects of tires on water quality is in the literature. Stone demonstrated that tire exposure had no detrimental effects on two species of marine fish while results of Kellough's freshwater tests were inconclusive, but suggested that some factor in tire leachate was toxic to rainbow trout (Oncorhynchus mykiss). Nozaka et al. found no harmful substances leached from tire material soaked in fresh water. Because there are few data on toxicity associated with tires, this became the focus of our study. Toxicity Identification Evaluation (TIE) procedures developed by the EPA were used to evaluate water quality impacted by tires. 17 refs., 4 figs.

Nelson, S.M.; Mueller, G. (Bureau of Reclamation, Denver, CO (United States)); Hemphill, D.C. (Lower Colorado Regional Office, Boulder City, NV (United States))

1994-08-01T23:59:59.000Z

154

Evaluation of a Prototype Surface Flow Bypass for Juvenile Salmon and Steelhead at the Powerhouse of Lower Granite Dam, Snake River, Washington, 1996-2000  

Science Conference Proceedings (OSTI)

A surface flow bypass provides a route in the upper water column for naturally, surface-oriented juvenile salmonids to safely migrate through a hydroelectric dam. Surface flow bypasses were recommended in several regional salmon recovery plans as a means to increase passage survival of juvenile salmonids at Columbia and Snake River dams. A prototype surface flow bypass, called the SBC, was retrofit on Lower Granite Dam and evaluated from 1996 to 2000 using biotelemetry and hydroacoustic techniques. In terms of passage efficiency, the best SBC configurations were a surface skimmer (99 m3/s [3,500 cfs], three entrances 5 m wide, 5 m deep and one entrance 5 m wide, 15 m deep) and a single chute (99 m3/s, one entrance 5 m wide, 8.5 m deep). They each passed 62 ? 3% (95% confidence interval) of the total juvenile fish population that entered the section of the dam with the SBC entrances (Turbine Units 4-5). Smooth entrance shape and concentrated surface flow characteristics of these configurations are worth pursuing in designs for future surface flow bypasses. In addition, a guidance wall in the Lower Granite Dam forebay diverted the following percentages of juvenile salmonids away from Turbine Units 1-3 toward other passage routes, including the SBC: run-at-large 79 ? 18%; hatchery steelhead 86%; wild steelhead 65%; and yearling chinook salmon 66%. When used in combination with spill or turbine intake screens, a surface flow bypass with a guidance wall can produce a high level (> 90% of total project passage) of non-turbine passage and provide operational flexibility to fisheries managers and dam operators responsible for enhancing juvenile salmonid survival.

Johnson, Gary E.; Anglea, Steven M.; Adams, Noah S.; Wik, Timothy O.

2005-02-28T23:59:59.000Z

155

Building America Top Innovations Hall of Fame Profile Â… Thermal Bypass Air Barriers in the 2009 International Energy Conservation Code  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Imagine Homes of San Antonio, Texas, worked Imagine Homes of San Antonio, Texas, worked with Building America team partner IBACOS to improve the continuity of the air barrier along the thermal enclosure by using spray foam insulation in the walls and attic. Building America research teams effectively demonstrated the importance of thermal bypass air barriers, which led to their inclusion in ENERGY STAR for Homes Version 3 specifications in 2006 and then to inclusion in the 2009 IECC. This is a great example of effective research driving a complete market transformation process for a critical high-performance home innovation. Air sealing of the home's thermal enclosure has been required by the energy code for many years. However, in years past, the provisions were somewhat vague and only required that critical areas of potential air leakage (e.g., joints,

156

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 54" Pipeline Replacing Main Canal – Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Brownsville Irrigation District to the North American Development Bank (NADB) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 1,844 ac-ft of water per year and 313,797,977 BTUs (91,969 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $24.70 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0001740 per BTU ($0.594 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $56.74 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0003335 per BTU ($1.138 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -1.46.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-07-01T23:59:59.000Z

157

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Brownsville Irrigation District to the North American Development Bank (NADB) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 48" pipeline to replace 2.31 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 1,872 ac-ft of water per year and 318,479,103 BTUs (93,341 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $27.98 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0001933 per BTU ($0.660 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $58.60 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0003444 per BTU ($1.175 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -1.53.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-10-01T23:59:59.000Z

158

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Annual report, May 1, 1995--April 30, 1996  

SciTech Connect

The principal objective of this project is to demonstrate the feasibility and economics success of producing oil from abandoned or nearly abandoned fields in the Dundee Formation of Central Michigan using horizontal drilling technology. The project is a cooperative venture between Michigan Technological University (MTU), Western Michigan University (WMU), and Terra Energy (now Cronus Development Co.). During the fall of 1995, the demonstration well for this project, the TOW No. 1-3 well in Crystal Field, Montcalm County, Michigan, was completed in the Dundee Formation and for the first three months of operation produced 50 bbl/day oil with no water cut. Because surface facilities were inadequate to handle full production, the well was produced for 12 hrs/day and shut in for 12 hrs/day. In January, 1996, new surface Facilities were completed and production was raised to 100 bbl/day. Daily production has varied from about 75 to 100 BOPD since that time. To date, the well has produced over 10, 000 bbls. The water cut remains at 0% and pressure has been maintained at 1445 psi by an active water drive. If expectations are met, the well will pay out in less than 1 year and continue on production for at least 5 years. Cronus Development Co. is tentatively planning to drill three more horizontal wells in the Dundee in Crystal Field. Thus, the play concept we chose to test, that bypassed attic oil remained in the Dundee reservoir between wells that had been produced at excessively high flow rates and had coned water during primary production, appears to be correct, and the TOW No. 1-3 HD-1 well is now a scientific, and appears soon to become an economic, success.

Wood, J.R.

1996-04-30T23:59:59.000Z

159

A Crystallographic Study of the Role of Sequence Context in Thymine Glycol Bypass by a Replicative DNA Polymerase Serendipitously Sheds Light on the Exonuclease Complex  

Science Conference Proceedings (OSTI)

Thymine glycol (Tg) is the most common oxidation product of thymine and is known to be a strong block to replicative DNA polymerases. A previously solved structure of the bacteriophage RB69 DNA polymerase (RB69 gp43) in complex with Tg in the sequence context 5'-G-Tg-G shed light on how Tg blocks primer elongation: The protruding methyl group of the oxidized thymine displaces the adjacent 5'-G, which can no longer serve as a template for primer elongation [Aller, P., Rould, M. A., Hogg, M, Wallace, S. S. and Doublie S. (2007). A structural rationale for stalling of a replicative DNA polymerase at the most common oxidative thymine lesion, thymine glycol. Proc. Natl. Acad. Sci. USA, 104, 814-818.]. Several studies showed that in the sequence context 5'-C-Tg-purine, Tg is more likely to be bypassed by Klenow fragment, an A-family DNA polymerase. We set out to investigate the role of sequence context in Tg bypass in a B-family polymerase and to solve the crystal structures of the bacteriophage RB69 DNA polymerase in complex with Tg-containing DNA in the three remaining sequence contexts: 5'-A-Tg-G, 5'-T-Tg-G, and 5'-C-Tg-G. A combination of several factors - including the associated exonuclease activity, the nature of the 3' and 5' bases surrounding Tg, and the cis-trans interconversion of Tg - influences Tg bypass. We also visualized for the first time the structure of a well-ordered exonuclease complex, allowing us to identify and confirm the role of key residues (Phe123, Met256, and Tyr257) in strand separation and in the stabilization of the primer strand in the exonuclease site.

Aller, Pierre; Duclos, Stéphanie; Wallace, Susan S.; Doublié, Sylvie (Vermont)

2012-06-27T23:59:59.000Z

160

Recovery of bypassed oil in the Dundee Formation (Devonian) of the Michigan Basin using horizontal drains. Final report, April 28, 1994--December 31, 1997  

SciTech Connect

Total hydrocarbon production in the Michigan Basin has surpassed 1 billion barrels (Bbbls) and total unrecovered reserves are estimated at 1--2 BBbls. However, hydrocarbon production in Michigan has fallen from 35 MMbbls/yr in 1979 to about 10 MMbbls/yr in 1996. In an effort to slow this decline, a field demonstration project designed around using a horizontal well to recover bypassed oil was designed and carried out at Crystal Field in Montcalm County, MI. The project had two goals: to test the viability of using horizontal wells to recover bypassed oil from the Dundee Formation, and to characterize additional Dundee reservoirs (29) that are look alikes to the Crystal Field. As much as 85 percent of the oil known to exist in the Dundee Formation in the Michigan Basin remains in the ground as bypassed oil. Early production techniques in the 137 fields were poor, and the Dundee was at risk of being abandoned, leaving millions of barrels of oil behind. Crystal Field in Montcalm County, Michigan is a good example of a worn out field. Crystal Field was once a prolific producer which had been reduced to a handful of wells, the best of which produced only 5 barrels per day. The demonstration well drilled as a result of this project, however, has brought new life to the Crystal Field. Horizontal drilling is one of the most promising technologies available for oil production. The new well was completed successfully in October of 1995 and has been producing 100 barrels of oil per day, 20 times better than the best conventional well in the field.

Wood, J.R.; Pennington, W.D.

1998-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Movement and Injury Rates for Three Life Stages of Spring Chinook Salmon Oncorhynchus Tshawytscha : A Comparison of Submerged Orifices and an Overflow Weir for Fish Bypass in a Modular Rotary Drum Fish Screen : Annual Report 1995.  

DOE Green Energy (OSTI)

The Pacific Northwest National Laboratory (PNNL) evaluated the effectiveness of 6-in. and 2-in. submerged orifices, and an overflow weir for fish bypass at a rotary drum fish screening facility. A modular drum screen built by the Washington Department of Fish and Wildlife (WDFW) was installed at PNNL`s Aquatic Ecology research laboratory in Richland, Washington. Fry, subyearlings, and smolts of spring chinook salmon (Oncorhynchus tshawyacha) were introduced into the test system, and their movement and injury rates were monitored. A total of 33 tests (100 fish per test) that lasted from 24 to 48 hr were completed from 1994 through 1995. Passage rate depended on both fish size and bypass configuration. For fry/fingerling spring chinook salmon, there was no difference in passage rate through the three bypass configurations (2-in. orifice, 6-in. orifice, or overflow weir). Subyearlings moved sooner when the 6-in. orifice was used, with more than 50% exiting through the fish bypass in the first 8 hr. Smolts exited quickly and preferred the 6-in. orifice, with over 90% of the smolts exiting through the bypass in less than 2 hr. Passage was slightly slower when a weir was used, with 90% of the smolts exiting in about 4 hr. When the 2-in. orifice was used in the bypass, 90% of the smolts did not exit until after 8 hr. In addition, about 7% of the smolts failed to migrate from the forebay within 24 hr, indicating that smolts were significantly delayed when the 2-in. orifice was used. Few significant injuries were detected for any of the life stages. However, light descaling occurred on about 15% of chinook salmon smolts passing through the 2-in. orifice. Although a single passage through the orifice did not appear to cause significant scale loss or other damage, passing through several screening facilities with 2-in. orifices could cause cumulative injuries.

Abernethy, C. Scott; Neitzel, Duane A.; Mavros, William V.

1996-03-01T23:59:59.000Z

162

Predicting target vessel location on robot-assisted coronary artery bypass graft using CT to ultrasound registration  

SciTech Connect

Purpose: Although robot-assisted coronary artery bypass grafting (RA-CABG) has gained more acceptance worldwide, its success still depends on the surgeon's experience and expertise, and the conversion rate to full sternotomy is in the order of 15%-25%. One of the reasons for conversion is poor pre-operative planning, which is based solely on pre-operative computed tomography (CT) images. In this paper, the authors propose a technique to estimate the global peri-operative displacement of the heart and to predict the intra-operative target vessel location, validated via both an in vitro and a clinical study. Methods: As the peri-operative heart migration during RA-CABG has never been reported in the literatures, a simple in vitro validation study was conducted using a heart phantom. To mimic the clinical workflow, a pre-operative CT as well as peri-operative ultrasound images at three different stages in the procedure (Stage{sub 0}--following intubation; Stage{sub 1}--following lung deflation; and Stage{sub 2}--following thoracic insufflation) were acquired during the experiment. Following image acquisition, a rigid-body registration using iterative closest point algorithm with the robust estimator was employed to map the pre-operative stage to each of the peri-operative ones, to estimate the heart migration and predict the peri-operative target vessel location. Moreover, a clinical validation of this technique was conducted using offline patient data, where a Monte Carlo simulation was used to overcome the limitations arising due to the invisibility of the target vessel in the peri-operative ultrasound images. Results: For the in vitro study, the computed target registration error (TRE) at Stage{sub 0}, Stage{sub 1}, and Stage{sub 2} was 2.1, 3.3, and 2.6 mm, respectively. According to the offline clinical validation study, the maximum TRE at the left anterior descending (LAD) coronary artery was 4.1 mm at Stage{sub 0}, 5.1 mm at Stage{sub 1}, and 3.4 mm at Stage{sub 2}. Conclusions: The authors proposed a method to measure and validate peri-operative shifts of the heart during RA-CABG. In vitro and clinical validation studies were conducted and yielded a TRE in the order of 5 mm for all cases. As the desired clinical accuracy imposed by this procedure is on the order of one intercostal space (10-15 mm), our technique suits the clinical requirements. The authors therefore believe this technique has the potential to improve the pre-operative planning by updating peri-operative migration patterns of the heart and, consequently, will lead to reduced conversion to conventional open thoracic procedures.

Cho, Daniel S.; Linte, Cristian; Chen, Elvis C. S.; Bainbridge, Daniel; Wedlake, Chris; Moore, John; Barron, John; Patel, Rajni; Peters, Terry [Imaging Research Laboratories, Robarts Research Institute and Biomedical Engineering Graduate Program, University of Western Ontario, Ontario N6A 5K8 (Canada); Imaging Research Laboratories, Robarts Research Institute and Biomedical Imaging Resource, Mayo Clinic, Rochester, Minnesota 55905 (United States); Imaging Research Laboratories, Robarts Research Institute, University of Western Ontario, Ontario N6A 5K8 (Canada); Canadian Surgical Technologies and Advanced Robotics, London, Ontario N6A 5A5 (Canada); Imaging Research Laboratories, Robarts Research Institute, University of Western Ontario, Ontario N6A 5K8 (Canada); Department of Computer Science, University of Western Ontario, Ontario N6A 5B7 (Canada); Canadian Surgical Technologies and Advanced Robotics, London, Ontario N6A 5A5 (Canada); Imaging Research Laboratories, Robarts Research Institute, Biomedical Engineering Graduate Program, University of Western Ontario N6A 5K8 (Canada); and Canadian Surgical Technologies and Advanced Robotics, London, Ontario N6A 5A5 (Canada)

2012-03-15T23:59:59.000Z

163

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - Rehabilitation of Alamo Main Canal - Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a two-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, to the U. S. Bureau of Reclamation (USBR). The proposed project primarily consists of relining the Alamo Main canal and installing a flow-management system in the Alamo Main canal. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 876 ac-ft of water per year and 331,389,647 BTUs (97,125 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $201.50 per ac-ft. The calculated economic and financial cost of energy savings is estimated to be $0.0005592 per BTU ($1.908 per kwh). In addition, expected real (vs nominal) values are indicated for the USBRs three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $182.98 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0004837 per BTU ($1.650 per kwh). The aggregate ratio of initial construction costs per dollar of total annual economic savings is estimated to be -20.74.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.

2005-04-01T23:59:59.000Z

164

Structural and Functional Analysis of Sulfolobus solfataricus Y-Family DNA Polymerase Dpo4-Catalyzed Bypass of the Malondialdehyde?Deoxyguanosine Adduct  

Science Conference Proceedings (OSTI)

Oxidative stress can induce the formation of reactive electrophiles, such as DNA peroxidation products, e.g., base propenals, and lipid peroxidation products, e.g., malondialdehyde. Base propenals and malondialdehyde react with DNA to form adducts, including 3-(2'-deoxy-{beta}-d-erythro-pentofuranosyl)pyrimido[1,2-{alpha}]purin-10(3H)-one (M{sub 1}dG). When paired opposite cytosine in duplex DNA at physiological pH, M{sub 1}dG undergoes ring opening to form N{sup 2}-(3-oxo-1-propenyl)-dG (N{sup 2}-OPdG). Previous work has shown that M{sub 1}dG is mutagenic in bacteria and mammalian cells and that its mutagenicity in Escherichia coli is dependent on induction of the SOS response, indicating a role for translesion DNA polymerases in the bypass of M{sub 1}dG. To probe the mechanism by which translesion polymerases bypass M{sub 1}dG, kinetic and structural studies were conducted with a model Y-family DNA polymerase, Dpo4 from Sulfolobus solfataricus. The level of steady-state incorporation of dNTPs opposite M{sub 1}dG was reduced 260-2900-fold and exhibited a preference for dATP incorporation. Liquid chromatography-tandem mass spectrometry analysis of the full-length extension products revealed a spectrum of products arising principally by incorporation of dC or dA opposite M{sub 1}dG followed by partial or full-length extension. A greater proportion of -1 deletions were observed when dT was positioned 5' of M{sub 1}dG. Two crystal structures were determined, including a 'type II' frameshift deletion complex and another complex with Dpo4 bound to a dC-M{sub 1}dG pair located in the postinsertion context. Importantly, M{sub 1}dG was in the ring-closed state in both structures, and in the structure with dC opposite M{sub 1}dG, the dC residue moved out of the Dpo4 active site, into the minor groove. The results are consistent with the reported mutagenicity of M{sub 1}dG and illustrate how the lesion may affect replication events.

Eoff, Robert L.; Stafford, Jennifer B.; Szekely, Jozsef; Rizzo, Carmelo J.; Egli, Martin; Guengerich, F. Peter; Marnett, Lawrence J.; (Vanderbilt)

2010-01-12T23:59:59.000Z

165

Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a capital renovation project proposed by Maverick County Water Control and Improvement District No. 1 to the Bureau of Reclamation and North American Development Bank. The proposed project involves lining 3 miles of the “Main Canal” with a urethane lining and a concrete anchor and ballast system. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $33.37 per ac-ft. The calculated economic and financial cost of energy savings is estimated to be $0.0001322 per BTU ($0.451 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $25.97 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001029 per BTU ($0.351 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -13.65.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2004-01-01T23:59:59.000Z

166

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San Juan) to the North American Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 977 ac-ft of water per year and 372,892,700 BTUs (109,289 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $70.97 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0002124 per BTU ($0.725 per kwh). In addition, expected real (vs nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $75.29 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001973 per BTU ($0.673 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.12.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2003-05-01T23:59:59.000Z

167

Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a capital renovation project proposed by Maverick County Water Control and Improvement District No. 1 to the Bureau of Reclamation and North American Development Bank. The proposed project involves lining 3 miles of the “Main Canal” with a urethane lining and a concrete anchor and ballast system. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $33.37 per ac-ft. The calculated economic and financial cost of energy savings is estimated to be $0.0001322 per BTU ($0.451 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $25.97 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001029 per BTU ($0.351 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -13.65.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2004-04-01T23:59:59.000Z

168

Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San Juan) to the North American Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 977 ac-ft of water per year and 372,892,700 BTUs (109,289 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $70.97 per ac-ft. The calculated economic and financial cost of energy savings is estimated at $0.0002124 per BTU ($0.725 per kwh). In addition, expected real (vs nominal) values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $75.29 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001973 per BTU ($0.673 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.12.

Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

2003-07-01T23:59:59.000Z

169

Treatment and Prognosis of Squamous Cell Carcinoma of the External Auditory Canal and Middle Ear: A Multi-Institutional Retrospective Review of 87 Patients  

Science Conference Proceedings (OSTI)

Purpose: To examine the relative roles of surgery, radiotherapy, and chemotherapy in the management of patients with squamous cell carcinomas of the external auditory canal and middle ear. Methods and Materials: The records of 87 patients with histologically confirmed squamous cell carcinoma who were treated between 1984 and 2005 were reviewed. Fifty-three patients (61%) were treated with surgery and radiotherapy (S + RT group) and the remaining 34 patients with radiotherapy alone (RT group). Chemotherapy was administered in 34 patients (39%). Results: The 5-year actuarial overall and disease-free survival (DFS) rates for all patients were 55% and 54%, respectively. On univariate analysis, T stage (Stell's classification), treatment modality, and Karnofsky performance status had significant impact on DFS. On multivariate analysis, T stage and treatment modality were significant prognostic factors. Chemotherapy did not influence DFS. The 5-year DFS rate in T1, T2, and T3 patients was 83%, 45%, and 0 in the RT group (p < 0.0001) and 75%, 75%, and 46% in the S + RT group (p = 0.13), respectively. The 5-year DFS rate in patients with negative surgical margins, those with positive margins, and those with macroscopic residual disease was 83%, 55%, and 38%, respectively (p = 0.007). Conclusions: Radical radiotherapy is the treatment of choice for early-stage (T1) diseases, whereas surgery (negative surgical margins if possible) with radiotherapy is recommended as the standard care for advanced (T2-3) disease. Further clarification on the role of chemotherapy is necessary.

Ogawa, Kazuhiko [Department of Radiology, University of the Ryukyus, Okinawa (Japan)]. E-mail: kogawa@med.u-ryukyu.ac.jp; Nakamura, Katsumasa [Department of Clinical Radiology, Kyushu University, Fukuoka (Japan); Hatano, Kazuo [Department of Radiation Oncology, Chiba Cancer Center, Chiba (Japan); Uno, Takashi [Department of Radiation Oncology, Chiba University, Chiba (Japan); Fuwa, Nobukazu [Department of Radiation Oncology, Aichi Cancer Center, Nagoya (Japan); Itami, Jun [Department of Radiation Therapy and Oncology, International Medical Center of Japan, Tokyo (Japan); Kojya, Shizuo [Department of Otorhinolaryngology, Heart Life Hospital, Okinawa (Japan); Nakashima, Torahiko [Department of Otorhinolaryngology, Kyushu University, Fukuoka (Japan); Shinhama, Akihiko [Department of Otorhinolaryngology, University of the Ryukyus, Okinawa (Japan); Nakagawa, Takashi [Department of Otorhinolaryngology, Fukuoka University, Fukuoka (Japan); Toita, Takafumi [Department of Radiology, University of the Ryukyus, Okinawa (Japan); Sakai, Mitsuhiro [Department of Radiation Oncology, Chiba Cancer Center, Chiba (Japan); Kodaira, Takeshi [Department of Radiation Oncology, Aichi Cancer Center, Nagoya (Japan); Suzuki, Mikio [Department of Otorhinolaryngology, University of the Ryukyus, Okinawa (Japan); Ito, Hisao [Department of Radiation Oncology, Chiba University, Chiba (Japan); Murayama, Sadayuki [Department of Radiology, University of the Ryukyus, Okinawa (Japan)

2007-08-01T23:59:59.000Z

170

Economic and Conservation Evaluation of Capital Renovation Projects: United Irrigation District of Hidalgo County (United) – Rehabilitation of Main Canal, Laterals, and Diversion Pump Station – Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a three-component capital renovation project proposed by the United Irrigation District to the U.S. Bureau of Reclamation (USBR). The proposed project involves: installing 4.66 miles of pipeline in the Main Canal and Lateral 7N, installing 13.46 miles of pipeline in several laterals and sub-laterals, and rehabilitating the District’s Rio Grande diversion pumping plant. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful lives for all three components. Sensitivity results for both the cost of saving water and the cost of saving energy are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 1,522 ac-ft of water per year and 3,520,302,471 BTUs (1,031,742 kwh) of energy per year. The calculated economic and financial cost of saving water is estimated to be $341.51 per ac-ft. The calculated economic and financial cost of saving energy is estimated at $0.0001574 per BTU ($0.537 per kwh). In addition, real (vs. nominal) values are estimated for the USBRs three principal evaluation measures specified in the U.S. Public Law 106-576. The aggregate initial construction cost per ac-ft of water savings measure is $359.42 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0003468 per BTU ($1.183 per kwh). The aggregate ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.551.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.

2006-03-01T23:59:59.000Z

171

Economic and Conservation Evaluation of Capital Renovation Projects: United Irrigation District of Hidalgo County (United) - Rehabilitation of Main Canal, Laterals, and Diversion Pump Station - Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a three-component capital renovation project proposed by the United Irrigation District to the U.S. Bureau of Reclamation (USBR). The proposed project involves: installing 4.66 miles of pipeline in the Main Canal and Lateral 7N, installing 13.46 miles of pipeline in several laterals and sub-laterals, and rehabilitating the District’s Rio Grande diversion pumping plant. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated useful lives for all three components. Sensitivity results for both the cost of saving water and the cost of saving energy are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 1,409 ac-ft of water per year and 4,506,882,727 BTUs (1,320,892 kwh) of energy per year. The calculated economic and financial cost of saving water is estimated to be $325.20 per ac-ft. The calculated economic and financial cost of saving energy is estimated at $0.0001113 per BTU ($0.380 per kwh). In addition, real (vs. nominal) values are estimated for the USBRs three principal evaluation measures specified in the U.S. Public Law 106-576. The aggregate initial construction cost per ac-ft of water savings measure is $354.30 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0003376 per BTU ($1.152 per kwh). The aggregate ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.442.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.

2005-09-01T23:59:59.000Z

172

Myocardial infarction determined by technetium-99m pyrophosphate single-photon tomography complicating elective coronary artery bypass grafting for angina pectoris  

SciTech Connect

The incidence of acute myocardial infarction (AMI) complicating coronary artery bypass grafting (CABG) has previously been based on concordance of electrocardiographic, enzymatic and scintigraphic criteria. Technetium-99m pyrophosphate (Tc-PPi) single-photon emission computed tomography now enables detection of AMI with high sensitivity and specificity. Using this technique, perioperative AMI was detected in 12 of 58 patients (21%) undergoing successful elective CABG for stable angina pectoris. Stepwise multivariate logistic regression analysis was performed to compare the predictive value of preoperative (New York Heart Association class, left ventricular ejection fraction and use of beta blockers) and intraoperative (number of grafts constructed, use of internal mammary anastomoses, use of sequential saphenous vein grafts, smallest grafted distal vessel lumen caliber and aortic cross-clamp time) variables. Preoperative New York Association class (p = 0.04) and smallest grafted distal vessel lumen caliber (p = 0.03) were significant multivariate predictors of perioperative AMI. Only 1 perioperative patient with AMI (and 1 pyrophosphate-negative patient) developed new Q waves. Serum creatine kinase-MB was higher in patients with AMI by repeated measures analysis of variance (p = 0.0003). Five AMIs occurred in myocardial segments revascularized using sequential saphenous vein grafts, and 7 in segments perfused by significantly stenosed epicardial vessels with distal lumen diameter and perfusion territory considered too small to warrant CABG. At 6-month follow-up, the mean left ventricular ejection fraction increased from 0.61 to 0.65 in Tc-PPI-negative patients (p = 0.01), but not in perioperative patients with AMI.

Burns, R.J.; Gladstone, P.J.; Tremblay, P.C.; Feindel, C.M.; Salter, D.R.; Lipton, I.H.; Ogilvie, R.R.; David, T.E.

1989-06-15T23:59:59.000Z

173

Plug Detector Bypass Breaker Guard  

Science Conference Proceedings (OSTI)

A method and apparatus are disclosed wherein the apparatus is a container having an inner chamber, an inlet, an outlet, a breaker assembly having at least one blade within the inner chamber of the container and a motor for driving the blade. Material is supplied to the inner chamber of the container through the inlet of the container and the breaker assembly is operated to reduce any clumped material into unclumped material which is then dispensed from the container through the outlet of the container.

Horton, J.R.; Dearstone, R.L.

2000-05-23T23:59:59.000Z

174

Plug Detector Bypass Breaker Guard  

DOE Patents (OSTI)

A method and apparatus wherein the apparatus is a container having an inner chamber, an inlet, an outlet, a breaker assembly having at least one blade within the inner chamber of the container and a motor for driving the blade. Material is supplied to the inner chamber of the container through the inlet of the container and the breaker assembly is operated to reduce any clumped material into unclumped material which is then dispensed from the container through the outlet of the container.

Horton, Joel Richard (Maryville, TN); Dearstone, Robert Link (Powell, TN)

2000-01-01T23:59:59.000Z

175

Model based detection of hydrogen leaks in a fuel cell stack Ari Ingimundarson and Anna G. Stefanopoulou and Denise McKay  

E-Print Network (OSTI)

will depend on the composition of the gas where the leak takes place. Two approaches are presented here but takes into account the natural leak of the stack and humidity. Hydrogen leak detection without using. Hydrogen has the lowest molecular weight and viscosity of any gas. Its properties make it have a faster

Stefanopoulou, Anna

176

Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by the Cameron County Irrigation District No. 2 (a.k.a. San Benito) to the North American Development Bank (NADBank) and Bureau of Reclamation. Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., a lined interconnect between Canals 39 and 13-A1 and replacement of the Rio Grande diversion pumping plant). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for both components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $41.26 per ac-ft and energy savings are measured at an aggregate value of $0.0001586 per BTU (i.e., $0.541 per kwh). In addition, expected values are indicated for the Bureau of Reclamation’s three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $157.07 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0001777 per BTU ($0.606 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -3.80.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2003-01-01T23:59:59.000Z

177

Genetics of microenvironmental canalization in Arabidopsis thaliana  

E-Print Network (OSTI)

) or microenvironmental variation expe- rienced by different individuals that otherwise inhabit the same macroenvironment were grown in environmentally con- trolled growth chambers, providing a common macroenviron- ment

Purugganan, Michael D.

178

Multiple Bypass: Interposition Agents for Distributed Computing  

Science Conference Proceedings (OSTI)

Interposition agents are a well-known device for attaching legacy applications to distributed systems. However, agents are difficult to build and are often large, monolithic pieces of software which are suited only to limited applications or systems. ... Keywords: distributed system, interposition agent, remote execution

Douglas Thain; Miron Livny

2001-03-01T23:59:59.000Z

179

A Fisheries Evaluation of the Dryden Fish Screening Facility : Annual Report 1994.  

DOE Green Energy (OSTI)

Effectivness was evaluated of the Dryden Fish Screening Facility in the Wenatchee Reclamation District Canal near Dryden in north central Washington State. In situ tests were conducted by releasing groups of hatchery reared salmonids of different ages and sizes. Spring chinook salmon smolts (110-165 mm) were not injured or descaled in passing through the canal forebay. Smolts were not delayed as they migrated in the canal. Most fish released at the canal headworks exited the screening facility in <4 h, with >99% of the test fish captured in the fish bypass in <24 h. Steelhead subyearlings 65-125 mm were not injured or descaled in traveling through the bypass flume and fish return pipe. Average time for steelhead subyearlings to travel through thebypass structure was 70 seconds. Small rainbow trout fry 23-27mm could pass through the 0.125-in. profile bar screen openings and were entrained in the irrigation canal; about 38% was lost to the canal within 48 h of release. Some fry stayed in the forebay and did not migrate during the tests. Wild chinook fry 36-42mm were also entrained. Estimated 34% of emergent wild chinook salmon fry passed through the profile bar screens and were entrained in the canal. Approach velocity at the Dryden screens was {ge}0.4 ft/s; low velocities through the first two screen panels indicated that vertical louvers installed behind each screen panel to balance flow were not totally effective.

Mueller, Robert P.; Abernethy, C.Scott; Neitzel, Duane A.

1995-04-01T23:59:59.000Z

180

Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

McKay, M. Clear All Filters 2006 Lunden, Melissa M., Douglas R. Black, M. McKay, Kenneth L. Revzan, Allen H. Goldstein, and Nancy J. Brown. "Characteristics of fine particle...

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Water quality modeling for the Kennet and Avon Canal, a navigational canal in an inland catchment  

E-Print Network (OSTI)

& Validation...........................................................141 7.2.1. Hydrology ................................................................................................141 7.2.2. Total Solids...

Zeckoski, Rebecca

2010-10-12T23:59:59.000Z

182

Canal Point, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Point, Florida: Energy Resources Point, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 26.8592258°, -80.6336676° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.8592258,"lon":-80.6336676,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

183

Nondestructive Evaluation: NDE for Fuel Pool and Transfer Canal Liners  

Science Conference Proceedings (OSTI)

This project addresses results of studies conducted with the long-range ultrasonic guided wave technique using magnetostrictive (MsS) sensors, rotational scanner with eddy current (EC) probes, alternating current field measurement (ACFM), and infrared thermography (IRT). Additionally, through collaborative work with EPRI’s Critical Power division, remotely operated vehicles (ROVs) were identified for delivering nondestructive evaluation (NDE) tools into spent fuel pools where extreme high ...

2013-11-26T23:59:59.000Z

184

A LATTICE AND BYPASS DESIGN FOR A COHERENT XUV FACILITY  

E-Print Network (OSTI)

Kadialiun Stor age Ring," Brookhaven Na l ional Laboratory,CA 94720 G. Vignola Brookhaven National Laboratory Upton,CA 94720 G. Vignola Brookhaven National Laboratory Upton,

Jackson, A.

2010-01-01T23:59:59.000Z

185

V-186: Drupal Login Security Module Security Bypass and Denial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

module features. Successful exploitation requires the "soft blocking" feature to be disabled. 2) The vulnerability is caused due to an error within the delay feature and can be...

186

COLLECTIVE EFFECTS AND LATTICE IMPLICATIONS FOR AN PEL BYPASS RING  

E-Print Network (OSTI)

72-10 Rev . [1] COIIput.r cod. ZAP. wrltt.n by M.S . 11 .embodl.d in the cQIIPut.r cod. ZAP) to parameter select10n.~ of the r i ng. of the cod. Includ. calculation para

Bisognano, J.

2010-01-01T23:59:59.000Z

187

PURADYN Oil Bypass Filtration System Evaluation Test Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

including: * Less dependency on foreign oil * Less oil disposed as waste products * Lower oil disposal costs * Less downtime of equipment * Reduced vehicle maintenance costs *...

188

Oil Bypass Filter Technology Evaluation Ninth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

Background on prior quarterly reports * Bus mileage and performance status * Used engine-oil disposal costs * Unscheduled oil change * Light-duty vehicle test status Oct 3-Dec 3...

189

Oil Bypass Filter Technology Evaluation Eighth Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

Background on prior quarterly reports * Bus mileage and performance status * Used engine-oil disposal costs * Unscheduled oil change * Light-duty vehicle test status Oct 3-Dec 3...

190

T-674: Drupal Secure Password Hashes Module Security Bypass Vulnerabil...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

library to try to store users hashed passwords securely. The module sets a fixed string for the 'pass' column in the users database column but does not replace the pass...

191

Oil Bypass Filter Technology Evaluation - Seventh Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Laboratory-WV National Renewable Energy Laboratory Naval Petroleum and Oil Shale Reserves CO, UT, WY Nevada Site Office Nevada Test Site Oak Ridge Institute for...

192

Oil Bypass Filter Technology Evaluation Seventh Quarterly Report...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Laboratory-WV National Renewable Energy Laboratory Naval Petroleum and Oil Shale Reserves CO, UT, WY Nevada Site Office Nevada Test Site Oak Ridge Institute for...

193

A LATTICE AND BYPASS DESIGN FOR A COHERENT XUV FACILITY  

E-Print Network (OSTI)

unit cell together with the lattice functions D , Dy and '1y 01 and Q2 are availab le for lattice tuning. This gives aeasy to tune and, for a lattice with such low emittance, one

Jackson, A.

2010-01-01T23:59:59.000Z

194

Switch bypass circuit for power line communication systems  

Science Conference Proceedings (OSTI)

An apparatus is described for coupling a power line communication signal around a switch, comprising: a first transformer having a primary winding and a secondary winding; a first inductor connected electrically in parallel with the primary winding of the first transformer, a first terminus of the primary winding of the first transformer being connected to ground; a first capacitor being connected electrically in series between a second terminus of the primary winding of the first transformer and the first inductor; a second transformer having a primary winding and a secondary winding; a second inductor connected electrically in parallel with the primary winding of the second transformer, a first terminus of the primary winding of the second transformer being connected to ground; a second capacitor being connected electrically in series between a second terminus of the primary winding of the transformer and the second inductor; a first terminus of the secondary winding of the first transformer being connected in electrical communication with a first terminus of the secondary winding of the second transformer; and a second terminus of the secondary winding of the first transformer being connected in electrical communication with a second terminus of the secondary winding of the second transformer; a transceiver connected in electrical communication with the first terminus and the second terminus of the secondary winding of the first transformer.

Shuey, K.C.

1987-08-11T23:59:59.000Z

195

Stage 3 bucket shank bypass holes and related method  

DOE Patents (OSTI)

In a multi-stage turbine wherein at least one turbine wheel supports a row of buckets for rotation, and wherein the turbine wheel is located axially between first and second annular fixed arrays of nozzles, a cooling air circuit for purging a wheelspace between the turbine wheel and the second fixed annular array of nozzles comprising a flowpath through a shank portion of one or more buckets connecting a wheelspace between the turbine wheel and the first fixed annular array of nozzles with the wheelspace between the turbine wheel and the second fixed annular array of nozzles.

Leone, Sal Albert (Scotia, NY); Eldrid, Sacheverel Quentin (Saratoga Springs, NY); Lupe, Douglas Arthur (Ballston Lake, NY)

2002-01-01T23:59:59.000Z

196

Community Relations, Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental, energy, and basic research. Speakers Bureau Contact: Robyn McKay Brookhaven National Laboratory Community Relations Office Bldg. 400C - P.O. Box 5000 Upton, NY...

197

Computer Algebra Group at SFU - Meetings, Colloquia - CECM  

E-Print Network (OSTI)

The meaning of 196884 = 196883 + 1 (part I). John Mckay, Concordia University. September 20th, 2004. Abstract: I shall discuss my work over the past 25 years ...

198

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

199

The Development of a Set of Principles for Through-Life Management of Engineering Information  

E-Print Network (OSTI)

, Montreal Dr Peter Heisig, University of Cambridge Professor Bill Ion, University of Strathclyde Dr Saikat Kundu, University of Leeds Professor Alison McKay, University of Leeds Professor Alan de Pennington, University of Leeds Professor James Ritchie...

McMahon, C A; Caldwell, N H M; Darlington, M J; Culley, S J; Giess, M D; Clarkson, P J

2009-10-26T23:59:59.000Z

200

Thursday  

Science Conference Proceedings (OSTI)

Mar 16, 2000 ... Peter Schumacher1; Brian J. McKay1; Pavel Cizek1; Keyna Q.A.. O'Reilly1; 1University of ...... Room: Lincoln C. March 16, 2000. Location: ...

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Methane Hydrate Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13-17. Ziervogel, K., McKay, L., Yang, T., Nigro, L., Gutierrez, T., Rhodes, B., Dickson-Brown, J., Osburn, C., Arnosti C., Teske, A., 2010. Formation of marine snow and...

202

Updated flood frequencies and a canal breach on the upper Klamath River  

E-Print Network (OSTI)

Klamath Hydroelectric Project (FERC Project No. 2082), WaterHydroelectric Project, FERC Project No. 2082. ” January 17,Regulatory Commission (FERC), PacifiCorp ( 2004) conducted

Fahey, Dan

2006-01-01T23:59:59.000Z

203

Water-waves modes trapped in a canal by a body with the rough surface  

E-Print Network (OSTI)

The problem about a body in a three dimensional infinite channel is considered in the framework of the theory of linear water-waves. The body has a rough surface characterized by a small parameter $\\epsilon>0$ while the distance of the body to the water surface is also of order $\\epsilon$. Under a certain symmetry assumption, the accumulation effect for trapped mode frequencies is established, namely, it is proved that, for any given $d>0$ and integer $N>0$, there exists $\\epsilon(d,N)>0$ such that the problem has at least $N$ eigenvalues in the interval $(0,d)$ of the continuous spectrum in the case $\\epsilon\\in(0,\\epsilon(d,N)) $. The corresponding eigenfunctions decay exponentially at infinity, have finite energy, and imply trapped modes.

G. Cardone; T. Durante; S. A. Nazarov

2009-10-06T23:59:59.000Z

204

Updated flood frequencies and a canal breach on the upper Klamath River  

E-Print Network (OSTI)

2004. “Klamath Hydroelectric Project (FERC Project No.Agencies at the Klamath Hydroelectric Project, FERC Project2005) Figure 2. The Klamath Hydroelectric Project Source:

Fahey, Dan

2006-01-01T23:59:59.000Z

205

Aircraft-Induced Hole Punch and Canal Clouds: Inadvertent Cloud Seeding  

Science Conference Proceedings (OSTI)

The production of holes and channels in altocumulus clouds by two commercial turboprop aircraft is documented for the first time. An unprecedented dataset combining in situ measurements from microphysical probes with remote sensing measurements ...

Andrew J. Heymsfield; Patrick C. Kennedy; Steve Massie; Carl Schmitt; Zhien Wang; Samuel Haimov; Art Rangno

2010-06-01T23:59:59.000Z

206

Prairie Canal Well No. 1, Calcasieu Parish, Louisiana. Volume II. Well test data. Final report  

DOE Green Energy (OSTI)

The following are included in appendices: field test data, field non-edited data, raw data, tentative method of testing for hydrogen sulfide in natural gas using length of stain tubes, combined sample log, report on reservoir fluids study, well test analysis, analysis of solids samples from primary zone, chemical analysis procedures, scale and corrosion evaluation, laboratory report on scale deposits, and sand detector strip charts. (MHR)

Not Available

1981-01-01T23:59:59.000Z

207

Fog and Tidal Current Connection at Cape Cod Canal—Early Recognition and Recent Measurements  

Science Conference Proceedings (OSTI)

Notes by Gardner Emmons about the initiation of low advective fogs on Cape Cod are presented. Subsequent measurements made in these fogs confirm his suggestion that mixing and temperature changes associated with tidal currents account for the ...

Alfred H. Woodcock

1982-02-01T23:59:59.000Z

208

Suez Canal, Sumed Pipeline are key parts of Egypt’s role in ...  

U.S. Energy Information Administration (EIA)

Biofuels: Ethanol & Biodiesel ... Supply chain. Although external factors have to this point played a larger role in altering hydrocarbon flows through Egypt's ...

209

From artifact to site : understanding the canal in the city of gardens  

E-Print Network (OSTI)

The words 'garden' and 'infrastructure' express the power of culture over nature. In celebration of its history of Mughal gardens and waterworks, Lahore has been construed in local imaginations as "the city of gardens". ...

Rehman, Nida

2009-01-01T23:59:59.000Z

210

Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.  

DOE Green Energy (OSTI)

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelhead and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one adult Pacific lamprey was trapped and released above the Westland ladder this year. The Threemile Dam west bank juvenile bypass was opened on March 11, 2008 in conjunction with water deliveries and continued through the summer. West Extension Irrigation District (WEID) discontinued diverting live flow on June 24, 2008 but the bypass remained open throughout the project year. The juvenile trap was not operated this project year.

Bronson, James P.; Loffink, Ken; Duke, Bill

2008-12-31T23:59:59.000Z

211

Physics Division ESH Bulletin 99-4 LASER INTERLOCK BYPASSED IN  

E-Print Network (OSTI)

result in personnel injury or damage to equipment. (ORPS Report CH-BH-BNL-NSLS-1999-0003) The interlock

212

U-247: EMC Cloud Tiering Appliance Flaw Lets Remote Users Bypass...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

access on the target system. Solution: The vendor has issued a fix Cloud Tiering Appliance (CTA) 7.5 and 9.0 with Hotfix ESA-2012-034 CTA 7.3.1 and later with Hotfix...

213

High speed bypass Fig. 1. Sub-module of MMC converter  

E-Print Network (OSTI)

current (HVDC) transmission links are taken into account. The results presented in this paper are able compensators at 150kV substations close to the connection points of HVDC links to Norway and Sweden via HVDC links. The capabilities of 3 HVDC links to Norway are 275MW, 275MW and 500MW

Chaudhary, Sanjay

214

Hybrid two fuel system nozzle with a bypass connecting the two fuel systems  

Science Conference Proceedings (OSTI)

A hybrid fuel combustion nozzle for use with natural gas, syngas, or other types of fuels. The hybrid fuel combustion nozzle may include a natural gas system with a number of swozzle vanes and a syngas system with a number of co-annular fuel tubes.

Varatharajan, Balachandar (Cincinnati, OH); Ziminsky, Willy Steve (Simpsonville, SC); Yilmaz, Ertan (Albany, NY); Lacy, Benjamin (Greer, SC); Zuo, Baifang (Simpsonville, SC); York, William David (Greer, SC)

2012-05-29T23:59:59.000Z

215

AN INTEGRATED APPROACH TO CHARACTERIZING BYPASSED OIL IN HETEROGENEOUS AND FRACTURED RESERVOIRS USING PARTITIONING TRACERS  

Science Conference Proceedings (OSTI)

We explore the use of efficient streamline-based simulation approaches for modeling partitioning interwell tracer tests in hydrocarbon reservoirs. Specifically, we utilize the unique features of streamline models to develop an efficient approach for interpretation and history matching of field tracer response. A critical aspect here is the underdetermined and highly ill-posed nature of the associated inverse problems. We have adopted an integrated approach whereby we combine data from multiple sources to minimize the uncertainty and non-uniqueness in the interpreted results. For partitioning interwell tracer tests, these are primarily the distribution of reservoir permeability and oil saturation distribution. A novel approach to multiscale data integration using Markov Random Fields (MRF) has been developed to integrate static data sources from the reservoir such as core, well log and 3-D seismic data. We have also explored the use of a finite difference reservoir simulator, UTCHEM, for field-scale design and optimization of partitioning interwell tracer tests. The finite-difference model allows us to include detailed physics associated with reactive tracer transport, particularly those related with transverse and cross-streamline mechanisms. We have investigated the potential use of downhole tracer samplers and also the use of natural tracers for the design of partitioning tracer tests. Finally, the behavior of partitioning tracer tests in fractured reservoirs is investigated using a dual-porosity finite-difference model.

Akhil Datta-Gupta

2003-08-01T23:59:59.000Z

216

An Integrated Approach to Characterizing Bypassed Oil in Heterogeneous and Fractured Reservoirs Using Partitioning Tracers  

SciTech Connect

We explore the use of efficient streamline-based simulation approaches for modeling and analysis partitioning interwell tracer tests in heterogeneous and fractured hydrocarbon reservoirs. We compare the streamline-based history matching techniques developed during the first two years of the project with the industry standard assisted history matching. We enhance the widely used assisted history matching in two important aspects that can significantly improve its efficiency and effectiveness. First, we utilize streamline-derived analytic sensitivities to relate the changes in reservoir properties to the production response. These sensitivities can be computed analytically and contain much more information than that used in the assisted history matching. Second, we utilize the sensitivities in an optimization procedure to determine the spatial distribution and magnitude of the changes in reservoir parameters needed to improve the history-match. By intervening at each iteration during the optimization process, we can retain control over the history matching process as in assisted history matching. This allows us to accept, reject, or modify changes during the automatic history matching process. We demonstrate the power of our method using two field examples with model sizes ranging from 10{sup 5} to 10{sup 6} grid blocks and with over one hundred wells. We have also extended the streamline-based production data integration technique to naturally fractured reservoirs using the dual porosity approach. The principal features of our method are the extension of streamline-derived analytic sensitivities to account for matrix-fracture interactions and the use of our previously proposed generalized travel time inversion for history matching. Our proposed workflow has been demonstrated by using both a dual porosity streamline simulator and a commercial finite difference simulator. Our approach is computationally efficient and well suited for large scale field applications in naturally fractured reservoirs with changing field conditions. This considerably broadens the applicability of the streamline-based analysis of tracer data and field production history for characterization of heterogeneous and fractured reservoirs.

Akhil Datta-Gupta

2005-08-01T23:59:59.000Z

217

An Integrated Approach to Characterizing Bypassed Oil in Heterogeneous and Fractured Reservoirs Using Partitioning Tracers  

SciTech Connect

We explore the use of efficient streamline-based simulation approaches for modeling partitioning interwell tracer tests in hydrocarbon reservoirs. Specifically, we utilize the unique features of streamline models to develop an efficient approach for interpretation and history matching of field tracer response. A critical aspect here is the underdetermined and highly ill-posed nature of the associated inverse problems. We have investigated the relative merits of the traditional history matching ('amplitude inversion') and a novel travel time inversion in terms of robustness of the method and convergence behavior of the solution. We show that the traditional amplitude inversion is orders of magnitude more non-linear and the solution here is likely to get trapped in local minimum, leading to inadequate history match. The proposed travel time inversion is shown to be extremely efficient and robust for practical field applications. The streamline approach is generalized to model water injection in naturally fractured reservoirs through the use of a dual media approach. The fractures and matrix are treated as separate continua that are connected through a transfer function, as in conventional finite difference simulators for modeling fractured systems. A detailed comparison with a commercial finite difference simulator shows very good agreement. Furthermore, an examination of the scaling behavior of the computation time indicates that the streamline approach is likely to result in significant savings for large-scale field applications. We also propose a novel approach to history matching finite-difference models that combines the advantage of the streamline models with the versatility of finite-difference simulation. In our approach, we utilize the streamline-derived sensitivities to facilitate history matching during finite-difference simulation. The use of finite-difference model allows us to account for detailed process physics and compressibility effects. The approach is very fast and avoids much of the subjective judgments and time-consuming trial-and-errors associated with manual history matching. We demonstrate the power and utility of our approach using a synthetic example and two field examples. We have also explored the use of a finite difference reservoir simulator, UTCHEM, for field-scale design and optimization of partitioning interwell tracer tests. The finite-difference model allows us to include detailed physics associated with reactive tracer transport, particularly those related with transverse and cross-streamline mechanisms. We have investigated the potential use of downhole tracer samplers and also the use of natural tracers for the design of partitioning tracer tests. Finally, we discuss several alternative ways of using partitioning interwell tracer tests (PITTs) in oil fields for the calculation of oil saturation, swept pore volume and sweep efficiency, and assess the accuracy of such tests under a variety of reservoir conditions.

Akhil Datta-Gupta

2006-12-31T23:59:59.000Z

218

Method for the generation of variable density metal vapors which bypasses the liquidus phase  

DOE Patents (OSTI)

The present invention provides a method for producing a metal vapor that includes the steps of combining a metal and graphite in a vessel to form a mixture; heating the mixture to a first temperature in an argon gas atmosphere to form a metal carbide; maintaining the first temperature for a period of time; heating the metal carbide to a second temperature to form a metal vapor; withdrawing the metal vapor and the argon gas from the vessel; and separating the metal vapor from the argon gas. Metal vapors made using this method can be used to produce uniform powders of the metal oxide that have narrow size distribution and high purity.

Kunnmann, Walter (Stony Brook, NY); Larese, John Z. (Rocky Point, NY)

2001-01-01T23:59:59.000Z

219

Revascularization for coronary artery disease in diabetes mellitus: Angioplasty, stents and coronary artery bypass grafting  

E-Print Network (OSTI)

Patients with diabetes mellitus (DM) are prone to a diffuse and rapidly progressive form of atherosclerosis, which increases their likelihood of requiring revascularization. However, the unique pathophysiology of atherosclerosis ...

Aronson, Doron

220

V-017: Apache Tomcat Security Bypass and Denial of Service Vulnerabili...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Service). 1) An error within the "parseHeaders()" function (InternalNioInputBuffer.java) when parsing request headers does not properly verify the permitted size and can be...

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Performance model of a very high bypass ratio counter rotating turbo fan engine.  

E-Print Network (OSTI)

?? Nowadays Snecma focuses on new engine architectures in order to meet the future demands in civil aviation. One of these considered concepts is aircrafts… (more)

Perrin, Martin

2012-01-01T23:59:59.000Z

222

Evaluation of an Angled Louver Facility for Guiding Sturgeon to a Downstream Bypass  

Science Conference Proceedings (OSTI)

Hydroelectric projects may expose downstream moving and migrating fish to injury and mortality during passage through the projects turbines. This report presents the results of a field evaluation of a louver array for guiding juvenile shortnose sturgeon toward a safe route past a water intake.

2006-03-28T23:59:59.000Z

223

Generation Maintenance Applications Center: Combined-Cycle Combustion Turbine Steam Bypass Model Maintenance Guide  

Science Conference Proceedings (OSTI)

BackgroundCombustion turbine combined-cycle (CTCC) facilities use various systems and components that are unique to this type of power generation plants and are not typically found in a nuclear or fossil power plant. As such, current CTCC facility owners’ use of the Electric Power ...

2013-12-14T23:59:59.000Z

224

Recovery of bypassed oil in the Dundee formation using horizontal drains  

Science Conference Proceedings (OSTI)

The principal objective of this project is to demonstrate the feasibility and economic success of producing oil from abandoned or nearly abandoned fields in the Dundee Formation of Central Michigan using horizontal drilling technology. A site for a horizontal well was selected in Crystal Field, a nearly-abandoned Dundee oil field in Michigan. This field had produced over 8 million barrels of oil, mostly in the 1930`s and 1940`s. At the height of development, Crystal Field produced from 193 wells, but by 1995, only seven producing wells remained, each producing less than 10 bbls/day. A horizontal well was drilled as a field demonstration pilot, funded through this DOE project, and was immensely successful. Core and logs from the Dundee interval were recovered from a vertical borehole at the same surface location. The horizontal well was brought on production at a rate of 100 bbls/day and is probably capable of producing at a higher rate. `The addition of several horizontal wells, similar to the demonstration well, will likely add another 2 million bbls (or more) to the cumulative production of the field over the next few years. The presence of untapped oil in this Dundee field was dramatically demonstrated and the favorable economics were made clearly evident. Additional project work comprises characterization of 30 Dundee fields in Michigan to aid in determining appropriate candidates for development through horizontal drilling. Further quantification of reservoir parameters such as importance of fracturing, fracture density, and irregularity of the dolomitized surface at the top of the reservoir will help in designing the optimal strategy for horizontal drilling. Technical progress is presented for the following tasks: project management; reservoir characterization; data measurement and analysis; database management; geochemical and basin modeling; and technology transfer.

Wood, J.R.

1996-04-30T23:59:59.000Z

225

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Quarterly report  

Science Conference Proceedings (OSTI)

The objective of this project is to consider the enhanced recovery of petroleum from the Dundee Formation using horizontal wells. This report contains summaries of the following tasks: project management; reservoir characterization; database management; drilling; and technology transfer. Some of the highlights are: well and log data sets and production data sets for all 30 fields are now complete and are stored in the TerraSciences` database at WMU; tops have been picked on all formations in all wells; well location and formation tops data sets are also now complete; The GeoGraphix Exploration System (GES) software package was acquired this quarter and installed on a PC in the Subsurface Laboratory at MTU.

Wood, J.R.

1995-07-17T23:59:59.000Z

226

Umatilla River Fish Passage Operations Program, 2001-2002 Annual Report.  

DOE Green Energy (OSTI)

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, Oregon is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 22, 2001 to September 12, 2002. A total of 5,519 summer steelhead (Oncorhynchus mykiss); 1,146 adult, 1,158 jack, and 970 subjack fall chinook (O. tshawytscha); 22,792 adult and 80 jack coho (O. kisutch); and 5,058 adult and 188 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 261 adult and 14 jack spring chinook were hauled upstream from Threemile Dam for release. There were 5,359 summer steelhead; 622 adult, 1,041 jack and 867 subjack fall chinook; 22,513 adult and 76 jack coho; and 4,061 adult and 123 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. In addition, 110 summer steelhead; 462 adult and 24 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 141 days between February 22 and July 12, 2002. During that period, fish were bypassed back to the river 134 days and were trapped 5 days. An estimated 200 pounds of juvenile fish were transported from Westland. Approximately 90% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened August 16, 2002. The bypass was run until October 31, 2001 with the exception of the period from August 29 to September 16. The bypass was reopened March 7, 2002 and ran until July 8. The juvenile trap was operated from July 8 to July 12 by the Umatilla Passage Evaluation project.

Zimmerman, Brian C. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

2003-02-01T23:59:59.000Z

227

Yakima and Touchet River Basins Phase II Fish Screen Evaluation, 2006-2007 Annual Report.  

DOE Green Energy (OSTI)

In 2006, Pacific Northwest National Laboratory (PNNL) researchers evaluated 27 Phase II fish screen sites in the Yakima and Touchet river basins. Pacific Northwest National Laboratory performs these evaluations for Bonneville Power Administration (BPA) to determine whether the fish screening devices meet those National Marine Fisheries (NMFS) criteria for juvenile fish screen design, that promote safe and timely passage of juvenile salmonids. The NMFS criteria against which the sites were evaluated are as follows: (1) a uniform flow distribution over the screen surface to minimize approach velocity; (2) approach velocities less than or equal to 0.4 ft/s protects the smallest salmonids from impingement; (3) sweep velocities that are greater than approach velocities to minimize delay of out-migrating juveniles and minimize sediment deposition near the screens; (4) a bypass flow greater than or equal to the maximum flow velocity vector resultant upstream of the screens to also minimize delay of out-migrating salmonids; (5) a gradual and efficient acceleration of flow from the upstream end of the site into the bypass entrance to minimize delay of out-migrating salmonids; and (6) screen submergence between 65% and 85% for drum screen sites. In addition, the silt and debris accumulation next to the screens should be kept to a minimum to prevent excessive wear on screens, seals and cleaning mechanisms. Evaluations consist of measuring velocities in front of the screens, using an underwater camera to assess the condition and environment in front of the screens, and noting the general condition and operation of the sites. Results of the evaluations in 2006 include the following: (1) Most approach velocities met the NMFS criterion of less than or equal to 0.4 ft/s. Of the sites evaluated, 31% exceeded the criterion at least once. Thirty-three percent of flat-plate screens had problems compared to 25% of drum screens. (2) Woody debris and gravel deposited during high river levels were a problem at several sites. In some cases, it was difficult to determine the bypass pipe was plugged until several weeks had passed. Slow bypass flow caused by both the obstructions and high river levels may have discouraged fish from entering the bypass, but once they were in the bypass, they may have had no safe exit. Perhaps some tool or technique can be devised that would help identify whether slow bypass flow is caused by pipe blockage or by high river levels. (3) Bypass velocities generally were greater than sweep velocities, but sweep velocities often did not increase toward the bypass. The latter condition could slow migration of fish through the facility. (4) Screen and seal materials generally were in good condition. (5) Automated cleaning brushes generally functioned properly; chains and other moving parts were typically well-greased and operative. (6) Washington Department of Fish and Wildlife (WDFW) and U.S. Bureau of Reclamation (USBR) generally operated and maintained fish screen facilities in a way that provided safe passage for juvenile fish. (7) Efforts with WDFW to find optimal louver settings at Naches-Selah were partly successful. The number of spots with excessive approach velocities was decreased, but we were unable to adjust the site to bring all approach values below 0.4 ft/s. (8) In some instances, irrigators responsible for specific maintenance at their sites (e.g., debris removal) did not perform their tasks in a way that provided optimum operation of the fish screen facility. Enforcement personnel proved effective at reminding irrigation districts of their responsibilities to maintain the sites for fish protection as well as irrigation. (9) We recommend placing datasheets providing up-to-date operating criteria and design flows in each site's logbox. The datasheet should include bypass design flows and a table showing depths of water over the weir and corresponding bypass flow. A similar datasheet relating canal gage readings and canal discharge in cubic feet per second would help identify times when the canal is taking mo

Chamness, Mickie; Tunnicliffe, Cherylyn [Pacific Northwest National Laboratory

2007-03-01T23:59:59.000Z

228

Velocity Measurements at Three Fish Screening Facilities in the Yakima Basin, Washington : Summer 1989 Annual Report.  

DOE Green Energy (OSTI)

The Pacific Northwest Laboratory (PNL) measured the velocity conditions at three fish screening facilities in the Yakima River Basin: Wapato, Chandler, and Easton Screens. The measurement objectives were different at the three screens. At Wapato, approach and sweep velocities were measured to evaluate the effect of rearing pens in the screen forebay. A complete survey was performed at the Chandler Screens. At Easton, velocity was measured behind the screens to provide information for the installation of porosity boards to balance flow through the screens. Salmon-rearing pens used at the Wapato Canal had a minimal effect on the magnitude of approach and sweep velocities at the face of the drum screens, although the pens caused increased turbulence and variability in water velocities. The net pens did not appear to affect flows through the three fish bypasses. 8 refs., 17 figs., 5 tabs.

Abernethy, C. Scott; Neitzel, Duane A.; Lusty, E. William

1990-09-01T23:59:59.000Z

229

A numerical method for predicting the bending fatigue life of NiTi and stainless steel root canal  

E-Print Network (OSTI)

or fluctuating strains at nominal stresses below (and often much less than) the yield strength of the material (Bannantine et al. 1989, ASM Interna- tional 1996). The material will succumb to propagat- ing fatigue­cracks) and are subjected to harsh working (corrosive) condi- tions under a combination of torsional and bending moments

Zheng, Yufeng

230

Pit-Tag Studies with Juvenile Salmonids at the Chandler Canal Fish Collection Facility, Yakima River : Annual Report 1990.  

DOE Green Energy (OSTI)

Juvenile salmonid survival studies planned for the Yakima Basin will require the release and recapture of large numbers of marked fish. Before these studies can be implemented, information is needed about potential recovery rates of marked fish at proposed sampling sites. The type of mark employed and the efficiency of the equipment used to capture and examine fish for marks must be evaluated since accurate survival estimates depend on their reliability. Recovery rates are expected to vary with species and life stage as well as environmental factors such as river flow and water temperature. The purpose of this study was to assess the mark-recovery capabilities of the Chandler facility and a mobile juvenile fish trap installed temporarily at West Richland, Washington near the mouth of the Yakima River.

Ruehle, Thomas E.; McCutcheon, Clinton Scott

1994-09-01T23:59:59.000Z

231

Modélisation et simulation numérique du colmatage à l’échelle du sous-canal dans les générateurs de vapeur.  

E-Print Network (OSTI)

??Ce travail de thèse s'inscrit dans le cadre d'un projet de recherche industriel visant à améliorer les méthodes et les outils de simulation du comportement… (more)

Prusek, Thomas

2012-01-01T23:59:59.000Z

232

Trapping and Transportation of Adult and Juvenile Salmon in the Lower Umatilla River in Northeast Oregon, 1996-1997 : Umatilla River Basin Trap and Haul Program : Annual Progress Report, October 1996-September 1997.  

DOE Green Energy (OSTI)

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were collected at Threemile Dam from August 30, 1996 to August 26, 1997. A total of 2,477 summer steelhead (Oncorhynchus mykiss); 646 adult, 80 jack, and 606 subjack fall chinook (O. tshawytscha); 618 adult and 24 jack coho (O. kisutch); and 2,194 adult and four jack spring chinook (O. tshawytscha) were collected. All fish were trapped at the east bank facility. Of the fish collected, 22 summer steelhead; 18 adult and two jack fall chinook; five adult coho; and 407 adult and three jack spring chinook were hauled upstream from Threemile Dam. There were 2,245 summer steelhead; 70 adult, 51 jack and 520 subjack fall chinook; 593 adult and 24 jack coho; and 1,130 adult spring chinook released at Threemile Dam I In addition, 110 summer steelhead; 551 adult and 25 jack fall chinook; and 600 adult spring chinook were collected for broodstock. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts, The canal was open for a total of 210 days between December 16, 1996 and July 30, 1997. During that period, fish were bypassed back to the river 175 days and were trapped on 35 days, An estimated 1,675 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5), Approximately 80% of the juveniles transported were salmonids, No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was operated from October 4 to November 1, 1996 and from March 26 to July 7, 1997. The juvenile trap was not operated this year. 6 refs., 6 figs., 6 tabs.

Zimmerman, Brian C.; Duke, Bill B.

1997-12-01T23:59:59.000Z

233

Trapping and Transportation of Adult and Juvenile Salmon in the Lower Umatilla River in Northeast Oregon: Umatilla River Basin Trap and Haul Program, October 1994-September 1995.  

DOE Green Energy (OSTI)

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were collected at Threemile Dam from August 26, 1994 to June 27, 1995. A total of 1,531 summer steelhead (Oncorhynchus mykiss); 688 adult, 236 jack, and 368 subjack fall chinook (O. tshawvtscha); 984 adult and 62 jack coho (O. kisutch) ; and 388 adult and 108 jack spring chinook (O. tshawvtscha) were collected. All fish were trapped at the east bank facility. Of the fish collected, 971 summer steelhead; 581 adult and 27 jack fall chinook; 500 adult and 22 jack coho; and 363 adult and 61 jack spring chinook were hauled upstream from Threemile Dam. There were also 373 summer steelhead; 12 adult, 186 jack and 317 subjack fall chinook; 379 adult and 32 jack coho; and 15 adult and one jack spring chinook released at Threemile Dam. In addition, 154 summer steelhead were hauled to Bonifer and Minthorn for brood. The Westland Canal facility, located near the town of Echo, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The facility operated for a total of 179 days between December 2, 1994 and July 19, 1995. During that period, fish were bypassed back to the river 137 days and were trapped 42 days. Three steelhead kelts and an estimated 1,560 pounds of juvenile fish were transported from the Westland Canal trap to the Umatilla River boat ramp at rivermile 0.5. Approximately 98% of the fish transported this year were salmonids. The Threemile Dam west bank juvenile bypass began operating March 25, 1995 and was closed on June 16, 1995. The juvenile trap was operated by Oregon Department of Fish and Wildlife research personnel from April 1, 1995 through the summer to monitor juvenile outmigration.

Zimmerman, Brian C.; Duke, Bill B.

1995-09-01T23:59:59.000Z

234

Recovery of bypassed oil in the Dundee formation using horizontal drains. Second quarterly report, [January--March 1995  

SciTech Connect

Well data, including drillers` logs, wireline logs, and seismic data, from the Crystal and 3 0 other Dundee oil fields in the Michigan basin have been acquired. Digitized logs of 336 wells that currently produce or have produced from the Dundee Formation in the seven-county study area have been purchased from Maness Petroleum Company. The data-gathering phase of the well-log program is now complete. Well-log analysis using TerraSciences TerraStation software has begun. Detailed analyses of wells with modem logs are being made using density/porosity and Pickett crossplots. Water saturations were calculated for several wells in the past month. Production data have been added to the well-file database. We now have the capability of mapping production as well as geology. Well-location basemaps with permit numbers were constructed for all 30 fields. Contour maps were completed for all 30 fields during the last quarter, including maps: on the top of the Dundee Formation, the top of the Dundee porosity zone (which is well below the top of the Dundee and varies in stratigraphic position throughout most fields), Dundee to Traverse isopachs, and initial production values before and after well treatment. At least two simple computer-generated cross sections were constructed for each field.

Wood, J.R.

1995-04-15T23:59:59.000Z

235

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Annual report, April 1994--June 1995  

SciTech Connect

Crystal Field in Montcalm County, MI, was selected as a field trial site for this project. Analysis of production data for Crystal Field suggests that an additional 200,000 bbls of oil can be produced using one strategically located horizontal well. Total addition production from the Crystal Field could be as much as 6--8 MMBO. Application of the technology developed in this project to other Dundee fields in the area has the potential to increase Dundee production in Michigan by 35%, adding 80--100 MMBO to ultimate recovery. This project will demonstrate through a field trial that horizontal wells can be substantially increase oil production in older reservoirs that are at or near their economic limit. To maximize the potential of the horizontal well and to ensure that a comprehensive evaluation can be made, extensive reservoir characterization will be performed. In addition to the proposed field trial at Crystal Field, 29 additional Dundee fields in a seven-county area have been selected for study in the reservoir characterization portion of this project.

Wood, J.

1995-08-01T23:59:59.000Z

236

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Quarterly report, October 1 - December 31, 1996  

Science Conference Proceedings (OSTI)

The principal objective of this project is to demonstrate the feasibility and economic success of producing oil from abandoned or nearly abandoned fields in the Dundee Formation of Central Michigan using horizontal drilling technology. A site for a horizontal well was selected in Crystal Field, a nearly-abandoned Dundee oil field in Michigan. This field had produced over 8 million barrels of oil, mostly in the 1930`s and 1940`s. At the height of development, Crystal Field produced from 193 wells, but by 1995, only seven producing wells remained, each producing less than 10 bbls/day. A horizontal well was drilled as a field demonstration pilot, funded through this DOE project, and was successful. It has produced over 37,000 bbls of oil as of December 31, 1996 at sustained rate of {approximately}100 bbls/day. At a nominal wellhead price of $20/bbl, this well has made about $750,000 and is still going strong. Two additional horizontal wells have just been completed and are on test. Core and logs from the Dundee interval were recovered from a vertical borehole at the same surface location. The horizontal well was brought on production at a rate of 100 bbls/day and is probably capable of producing at a higher rate. The addition of several horizontal wells, similar to the demonstration well, will likely add another 2 million bbls (or more) to the cumulative production of the field over the next few years. The presence of untapped oil in this Dundee field was dramatically demonstrated and the favorable economics were made clearly evident. If other abandoned Dundee fields are re-developed in a similar manner, the additional oil produced could exceed 80 million barrels. Horizontal drilling will likely revolutionize the development of old carbonate fields such as those in the Dundee of Michigan.

Wood, J.R.

1997-01-01T23:59:59.000Z

237

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Quarterly report, July 1, 1996--September 30, 1996  

Science Conference Proceedings (OSTI)

The principal objective of this project is to demonstrate the feasibility and economic success of producing oil from abandoned or nearly abandoned fields in the Dundee Formation of Central Michigan using horizontal drilling technology. A site for a horizontal well was selected in Crystal Field, a nearly-abandoned Dundee oil field in Michigan. This field had produced over 8 million barrels of oil, mostly in the 1930`s and 1940`s. At the height of development, Crystal Field produced from 193 wells, but by 1995, only seven producing wells remained, each producing less than 10 bbls/day. A horizontal well was drilled as a field demonstration pilot, funded through this DOE project, and was immensely successful. Core and logs from the Dundee interval were recovered from a vertical borehole at the same surface location. The horizontal well was brought on production at a rate of 100 bbls/day and is probably capable of producing at a higher rate. The addition of several horizontal wells, similar to the demonstration well, will likely add another 2 million bbls (or more) to the cumulative production of the field over the next few years. The presence of untapped oil in this Dundee field was dramatically demonstrated and the favorable economics were made clearly evident. If other abandoned Dundee fields are re-developed in a similar manner, the additional oil produced could exceed 80 Trillion barrels. Horizontal drilling will likely revolutionize the development of old carbonate fields such as those in the Dundee of Michigan.

Wood, J.R.

1996-10-31T23:59:59.000Z

238

Utilizing a Multi-Technique, Multi-Taxa Approach to Monitoring Wildlife Passageways on the Bennington Bypass in Southern Vermont  

E-Print Network (OSTI)

onto 4’ X 4’ squares of plywood. We concluded overall thatthe sifting of the dust onto plywood. The hard foundationMarble dust placed atop plywood serves as the preferred

Bellis, Mark A; Jackson, Scott D.; Griffin, Curtice R; Warren, Paige S; Thompson, Alan O

2007-01-01T23:59:59.000Z

239

Utilizing a Multi-Technique, Multi-Taxa Approach to Monitoring Wildlife Passageways on the Bennington Bypass in Southern Vermont  

E-Print Network (OSTI)

highway in southern Vermont. We are utilizing a variety offor future studies in Vermont and through- out the Unitedas Arizona, Montana and Vermont. Through cooperative efforts

Bellis, Mark A; Jackson, Scott D.; Griffin, Curtice R; Warren, Paige S; Thompson, Alan O

2007-01-01T23:59:59.000Z

240

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Quarterly report, January 1--March 31, 1996  

SciTech Connect

A site for horizontal well was selected in Crystal Field, a nearly-abandoned Dundee oil field in Michigan. This field had produced over 8 million barrels of oil, mostly in the 1930`s and 1940`s. At the height of development, Crystal Field produced from 193 wells, but by 1995, only seven producing wells remained, each producing less than 10 bbls/day. A horizontal well was drilled as a field demonstration pilot, funded through this DOE project, and was immensely successful. Core and logs from the Dundee interval were recovered from a vertical borehole at the same surface location. The horizontal well was brought on production at a rate of 100 bbls/day and is probably capable of producing at a higher rate. The addition of several horizontal wells, similar to the demonstration well, will likely add another 2 million bbls (or more) to the cumulative production of the field over the next few years. The presence of untapped oil in this Dundee field was dramatically demonstrated and the favorable economics were made clearly evident. If other abandoned Dundee fields are re-developed in a similar manner, the additional oil produced could exceed 80 million barrels. Horizontal drilling will likely revolutionize the development of old carbonate fields such as those in the Dundee of Michigan. Additional project work comprises characterization of 30 other Dundee fields in Michigan to aid in determining appropriate candidates for development through horizontal drilling. Further quantification of reservoir parameters such as importance of fracturing, fracture density, and irregularity of the dolomitized surface at the top of the reservoir will help in designing the optimal strategy for horizontal drilling.

Wood, J.R.

1996-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Quarterly report, 4th quarter, FY 1994  

SciTech Connect

Well data, including drillers` logs, wireline logs, and seismic data, from the Crystal and other Dundee hydrocarbon fields in the Michigan basin, have been acquired. Digitized logs of 342 wells that currently produce or have produced from the Dundee Formation in the seven-county study area have been purchased from Maness Petroleum Company. Multiple logs exist for each well, and include gamma ray, caliper, lithodensity, neutron porosity, various types of resistivity, and some sonic logs. Twenty to thirty cores of the Dundee Formation from throughout the state of Michigan are currently available. Cuttings samples are also available from 60 to 100 Michigan wells. The storage locations of many of these core and cuttings samples have been identified, but sampling has not yet begun. A well has been designed and permitted and will soon be drilled. This well will have both a horizontal and a vertical leg. The vertical leg well will be cored through the producing interval of the Dundee Formation and the cores will be analyzed for porosity, permeability, and fluid saturations. A full set of well logs will be run, including gamma ray, porosity, resistivity, and geochemistry logs. This data will be incorporated into the existing database for the project area and used to calibrate the MWD (Measurement While Drilling) logs which will be run during the drilling of the horizontal leg. The horizontal leg will be drilled as a sidetrack from the vertical test well. If commercial amounts of hydrocarbons are encountered, the horizontal well will be placed on production. Drilling is expected to commence in late 1994 or early 1995, after completion of an environmental survey.

Wood, J.R.

1994-10-01T23:59:59.000Z

242

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Quarterly report, July 1995--September 1995  

Science Conference Proceedings (OSTI)

This report describes well drilling and logging activities performed at Crystal Field. Progress on reservoir characterization, data acquisition and analysis is discussed.

Wood, J.R.

1995-10-01T23:59:59.000Z

243

Recovery of bypassed oil in the Dundee Formation using horizontal drains. Annual report, March 1996--March 1997  

SciTech Connect

This Class II field project has demonstrated that economic quantities of hydrocarbons can be produced from abandoned or nearly abandoned fields in the Dundee Formation of Central Michigan using horizontal drilling technology. The site selected for the demonstration horizontal well was Crystal Field, a nearly abandoned Dundee oil field in Montcalm County, Michigan. This field had produced over 8 million barrels of oil, mostly in the 1930`s and 1940`s. At the height of development, Crystal Field produced from 193 wells, but by 1995, only seven producing wells remained, each producing less than 10 bbls/day. A horizontal well, the TOW 1-3, drilled as a field demonstration pilot was successful, producing at rate of 100 bbls of oil per day with a zero water cut. Although the well is capable of producing at a of 500+ bbls/day, the production rate is being kept low deliberately to try to prevent premature water coning. Cumulative production exceeded 50,000 bbls of oil by the end of April, 1997 and lead to the permitting and licensing of several dozen Dundee wells by project end. Twelve of these permits were for continued development of Crystal Field. Two long horizontal wells were drilled successfully in Crystal after the TOW 1-3, but were disappointing economically. Core and logs from the Dundee interval were recovered from a vertical borehole at the same surface location. The addition of several horizontal wells will likely add another 2 million bbls (or more) to the cumulative production of the field over the next few years. If other abandoned Dundee fields are re-developed in a similar manner, the additional oil produced could exceed 80 million barrels.

NONE

1998-04-01T23:59:59.000Z

244

Recovery of bypassed oil in the Dundee formation using horizontal drains. Quarterly progress report, October 1, 1995--December 31, 1995  

Science Conference Proceedings (OSTI)

The principal objective of this project is to demonstrate the feasibility and economic success of producing oil from abandoned or nearly abandoned fields in the Dundee Formation of Central Michigan using horizontal drilling technology. A site for a horizontal well was selected in Crystal Field, a nearly-abandoned Dundee oil field in Michigan. This field had produced over 8 million barrels of oil, mostly in the 1930`s and 1940`s. At the height of development, Crystal Field produced from 193 wells, but by 1995, only seven producing wells remained, each producing less than 10 bbls/day. A horizontal well was drilled as a field demonstration pilot, funded through this DOE project, and was immensely successful. Core and logs from the Dundee interval were recovered from a vertical borehole at the same surface location. The horizontal well was brought on production at a rate of 100 bbls/day and is probably capable of producing at a higher rate. The addition of several horizontal wells, similar to the demonstration well, will likely add another 2 million bbls (or more) to the cumulative production of the field over the next few years. The presence of untapped oil in this Dundee field was dramatically demonstrated and the favorable economics were made clearly evident. If other abandoned Dundee fields are re-developed in a similar manner, the additional oil produced domestically will probably be about 80 to 100 million bbls.

Wood, J.R.

1996-01-29T23:59:59.000Z

245

Environmental concerns and future oil and gas developments in Coastal Wetlands of Louisiana  

Science Conference Proceedings (OSTI)

Recent studies have confirmed that much oil and natural gas have been overlooked and increases in future recoverable reserves will come from drilling in these areas. Increased production will result from identifying unexploited compartmentalized reservoirs, new infield reservoirs, and bypassed reservoirs, and by using enhanced recovery technologies for hydrocarbon recovery in incompletely drained reservoirs previously left unproduced for economic reasons. Most of southern Louisiana's hydrocarbon reserves underlie coastal wetland areas of the state. Major environmental concerns associated with the future development of existing reserves are canal dredging and destruction of wildlife habitat, use and disposal of oil-based muds, mitigation for wetland damage, and the recent emerging issue of surface contamination by naturally occurring radioactive materials with potential liabilities and future remedial regulation. To reduce wetland environmental damage caused by access canals to drilling sites, the Coastal Management Division of the Louisiana Department of Natural Resources instituted a geologic reviews program to review drilling permit application in the coastal wetlands. This process provides a mechanism for state and federal agencies to comment on the requested drilling permit. As a result of this process, the total average wetland disturbed area has been reduced from 767 ac per year in 1982 to approximately 76 ac per year in 1991. Average lengths of access canals also have been reduced by approximately 78% during the period. Oil and gas companies are becoming increasingly aware of the environmental consequences of drilling in wetlands and are considering them in planning for development activities. In the current climate of increasing public consciousness about the environment, addressing environmental concerns in the planning state will go a long way in helping alleviate future environmental problems.

John, C.J.; Harder, B.J.; Groat, C.G. (Louisiana State Univ., Baton Rouge, LA (United States))

1993-09-01T23:59:59.000Z

246

Umatilla River Fish Passage Operations Program, 2000-2001 Annual Report.  

DOE Green Energy (OSTI)

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 17, 2000 to July 7, 2001. A total of 3,662 summer steelhead (Oncorhynchus mykiss); 643 adult, 437 jack, and 4,948 subjack fall chinook (O. tshawytscha); 4,654 adult and 1,276 jack coho (O. kisutch); and 4,382 adult and 185 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 14 summer steelhead and 847 adult and 74 jack spring chinook were hauled upstream from Threemile Dam. There were 3,433 summer steelhead; 71 adult, 298 jack and 4,647 subjack fall chinook; 4,435 adult and 1,180 jack coho; and 2,873 adult and 55 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. In addition, 116 summer steelhead; 565 adult and 38 jack fall chinook; and 646 adult and 31 jack spring chinook were collected for brood. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 147 days between February 5 and July 26, 2001. During that period, fish were bypassed back to the river 127 days and were trapped 18 days. An estimated 350 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 92% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was open throughout the summer of 2000 and continued to run until October 27, 2000. The bypass was reopened March 8, 2001 and ran until July 9, 2001. The juvenile trap was not operated this year.

Zimmerman, Brian C. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

2003-02-01T23:59:59.000Z

247

Umatilla River Fish Passage Operations Program, 2002-2003 Annual Report.  

DOE Green Energy (OSTI)

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 17, 2002 to September 29, 2003. A total of 3,080 summer steelhead (Oncorhynchus mykiss); 1716 adult, 617 jack, and 1,709 subjack fall chinook (O. tshawytscha); 3,820 adult and 971 jack coho (O. kisutch); and 3,607 adult and 135 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 6 summer steelhead and 330 adult and 49 jack spring chinook were hauled upstream from Threemile Dam. There were 2,882 summer steelhead; 1161 adult, 509 jack and 1,546 subjack fall chinook; 3,704 adult and 915 jack coho; and 2,406 adult and 31 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 109 summer steelhead; 532 adult and 32 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. In addition, 282 spring chinook were collected for the outplanting efforts in the Walla Walla Basin. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 159 days between January 27 and July 4, 2003. During that period, fish were bypassed back to the river 145 days and were trapped 11 days. An estimated 205 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 82% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened on September 16, 2002. and continued until November 1, 2002. The bypass was reopened March 3, 2003 and ran until July 3, 2003. The juvenile trap was operated by the Umatilla Passage Evaluation Project.

Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

2004-03-01T23:59:59.000Z

248

Umatilla River Fish Passage Operations Program, 2003-2004 Annual Report.  

DOE Green Energy (OSTI)

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 19, 2003 to July 8, 2004. A total of 3,388 summer steelhead (Oncorhynchus mykiss); 1,482 adult, 638 jack, and 2,150 subjack fall chinook (O. tshawytscha); 8,319 adult and 667 jack coho (O. kisutch); and 2,965 adult and 270 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 34 summer steelhead and 31 adult and 9 jack spring chinook were hauled upstream from Threemile Dam. There were 3,166 summer steelhead; 1,076 adult, 554 jack and 2,026 subjack fall chinook; 8,213 adult and 647 jack coho; and 2,152 adult and 174 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 121 summer steelhead; 388 adult and 19 jack fall chinook; and 561 adult and 29 jack spring chinook were collected for brood. In addition, 239 spring chinook were collected for the outplanting efforts in the Walla Walla Basin. There were also 25 pair hatchery steelhead adults collected for the progeny maker study. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 184 days between January 12 and July 6, 2004. During that period, fish were bypassed back to the river 173 days and were trapped 10 days. An estimated 44 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 84% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened on February 10, 2004 for outmigration sampling and continued until July 7, 2004 when sampling was discontinued. The juvenile bypass ran at the 5 cfs level until the initiation of Phase I on August 15, 2004. The juvenile trap was operated by the Oregon Department of Fish and Wildlife (ODFW) under the Evaluation of Umatilla Juvenile Salmonid Outmigration Project.

Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

2005-08-01T23:59:59.000Z

249

The oxidationreduction potential of aqueous soil solutions at the Mars Phoenix landing site  

E-Print Network (OSTI)

with high oxidation reduction potentials (ORP) [Zent and McKay, 1994]. Direct measurements of aqueous of the Viking biology experiments or as a contributing species to the solu- tion ORP. [3] In this paper, results from the Wet Chemistry Labora- tory are used to determine the ORP of the Phoenix WCL Rosy Red sample

Kounaves, Samuel P.

250

Variance Decomposition Sensitivity Analysis of a Passive Residual Heat Removal System Model  

E-Print Network (OSTI)

Temperature Gas-Cooled Reactor ­ Pebble Bed Modular (HTR-PM). 1. Introduction Generation IV nuclear reactor with an application to a gas-cooled reactor", Nuclear Engineering and Design, 238(1), pp.217-228. McKay, M. D., 1996 of Nuclear and New Energy technology, Tsinghua University, Beijing, China b Department of Energy, Polytechnic

251

Washington State University 20082009 President's  

E-Print Network (OSTI)

Karcher Dan McKay Tom and Carolyn McKern Edward and Louise McLam Bruce McLane Dan McLaughlin and Jane Parker Steven Koenig and Anastasia Condron +Marionne Langemack Glenn Leitz Michael and Debra Leslie Robert

Collins, Gary S.

252

Formation and Genotoxicity of Novel Oxidatively Generated Tandem DNA Lesions and N2-(1-carboxyethyl)-2'-deoxyguanosine  

E-Print Network (OSTI)

free and error-prone lesion bypass by human DNA polymerase ?free and error-prone lesion bypass by human DNA polymerase kfree and error-prone lesion bypass by human DNA polymerase

Jiang, Yong

2009-01-01T23:59:59.000Z

253

Holistic Approach for Water Management Planning of Nong Chok District in Bangkok, Thailand  

E-Print Network (OSTI)

the 3- to 4- storey commercial buildings. o Saen Seab CanalSaen Seab Canal Figure 39: Satellite image showing theSuksawang Figure 41-42: Saen Seab Canal Figure 43-44:

Suksawang, Wilasinee

2012-01-01T23:59:59.000Z

254

Synthesis of Sensor Fish Data for Assessment of Fish Passage Conditions at Turbines, Spillways, and Bypass Facilities – Phase 1: The Dalles Dam Spillway Case Study  

DOE Green Energy (OSTI)

This report summarizes the characterization of spillway passage conditions at The Dalles Dam in 2006 and the effort to complete a comprehensive database for data sets from The Dalles Dam spillway Sensor Fish and balloon-tagged live fish experiments. Through The Dalles Dam spillway case study, Pacific Northwest National Laboratory (PNNL) researchers evaluated the database as an efficient means for accessing and retrieving system-wide data for the U.S Army Corps of Engineers (USACE).

Deng, Zhiqun; Serkowski, John A.; Fu, Tao; Carlson, Thomas J.; Richmond, Marshall C.

2007-12-31T23:59:59.000Z

255

Assist in the recovery of bypassed oil from reservoirs in the Gulf of Mexico. Quarterly status report, April 1, 1993--June 30, 1993  

Science Conference Proceedings (OSTI)

Much of the remaining oil offshore is trapped in formations that are extremely complex due to intrusions of salt domes. Conventional seismic processing techniques cannot clearly image either these traps or the full extent of oil-bearing segments near the salt domes; therefore, substantial volumes of oil may have remained uncontacted by previous drilling. Recently, however, significant innovations have been made in seismic processing and mathematical migration of seismic signal. In addition, significant advances have been made in deviated and horizontal drilling technologies and applications. These technology advances make it possible to reprocess existing seismic data to identify non-contacted portions of the reservoirs, which can then be contacted using advanced drilling technologies to kick out new wells from existing wells. Effective application of these technologies, along with improved recovery methods, offers opportunities to significantly increase Gulf of Mexico production, delay platform abandonments, and preserve access to a substantial remaining oil target for enhanced recovery and other advanced recovery processes. During this reporting period, data collection continued from the Minerals Management Service (MMS) and several operators. Modifications to BOAST II and MASTER reservoir simulators for the integration of radial grid systems and for use in simulating miscible gas injection processes in steeply dipping reservoirs continued. The testing of the experimental apparatus designed for studying the recovery of attic oil began. Analysis of data obtained from Taylor Energy in South Marsh 73 field continued.

Schenewerk, P.A.

1993-07-30T23:59:59.000Z

256

Recovery of bypassed oil in the Dundee Formation using horizontal drains. 2nd Quarterly report, April 1, 1994--June 30, 1994  

Science Conference Proceedings (OSTI)

A meeting of project personnel was held in Traverse City, MI, on June 8, 1994 to initiate the DOE contract. The drilling program, which will be the project`s first major undertaking, was discussed in detail. Data from 12 Dundee fields, including Crystal Field, have been entered in a computer database by project staff at WMU. Structure contour maps and isopach maps have been generated for all horizons in these fields using Terrasciences` TerraStation computer program. Arrangements have been made to purchase digitized logs of every well that produces or has produced from the Dundee Formation in the state of Michigan. Twenty to thirty cores of the Dundee Formation from wells throughout the state of Michigan are currently available. Cuttings samples are also available from 60 to 100 Michigan wells. A well in the project area has been designed and permitted and will soon be drilled. The well will have both a horizontal and a vertical leg. The vertical leg well will be cored through the producing interval of the Dundee Formation and the cores analyzed for porosity, permeability, and fluid saturations. A full set of well logs will be run, including gamma ray, porosity, resistivity, and geochemical logs. The horizontal leg will be drilled as a sidetrack from the vertical test well. If commercial amounts of hydrocarbons are encountered, the horizontal well will be placed on production. It is expected that drilling will commence in August, 1994, and will take 10 to 12 days to complete.

Wood, J.R.

1994-07-01T23:59:59.000Z

257

Improvement of Carbon Dioxide Sweep Efficiency by Utilization of Microbial Permeability Profile Modification to Reduce the Amount of Oil Bypassed During Carbon Dioxide Flood  

Science Conference Proceedings (OSTI)

The objective of this project was to couple microbial permeability profile modification (MPPM), with carbon dioxide flooding to improve oil recovery from the Upper Cretaceous Little Creek Oil Field situated in Lincoln and Pike counties, MS. This study determined that MPPM technology, which improves production by utilizing environmentally friendly nutrient solutions to simulate the growth of the indigenous microflora in the most permeable zones of the reservoir thus diverting production to less permeable, previously unswept zones, increased oil production without interfering with the carbon dioxide flooding operation. Laboratory tests determined that no microorganisms were produced in formation waters, but were present in cores. Perhaps the single most significant contribution of this study is the demonstration that microorganisms are active at a formation temperature of 115?C (239?F) by using a specially designed culturing device. Laboratory tests were employed to simulate the MPPM process by demonstrating that microorganisms could be activated with the resulting production of oil in coreflood tests performed in the presence of carbon dioxide at 66?C (the highest temperature that could be employed in the coreflood facility). Geological assessment determined significant heterogeneity in the Eutaw Formation, and documented relatively thin, variably-lithified, well-laminated sandstone interbedded with heavily-bioturbated, clay-rich sandstone and shale. Live core samples of the Upper Cretaceous Eutaw Formation from the Heidelberg Field, MS were quantitatively assessed using SEM, and showed that during MPPM permeability modification occurs ubiquitously within pore and throat spaces of 10-20 ?m diameter. Testing of the MPPM procedure in the Little Creek Field showed a significant increase in production occurred in two of the five production test wells; furthermore, the decline curve in each of the production wells became noticeably less steep. This project greatly extends the number of oil fields in which MPPM can be implemented.

Darrel Schmitz; Lewis Brown F. Leo Lynch; Brenda Kirkland; Krystal Collins; William Funderburk

2010-12-31T23:59:59.000Z

258

Validation that a 1-year fellowship in minimally invasive and bariatric surgery can eliminate the learning curve for laparoscopic gastric bypass  

E-Print Network (OSTI)

a six-week focused training program for minimally invasivesurgery fellowship training program in?uence operativeof a fellowship training program in minimally invasive and

2010-01-01T23:59:59.000Z

259

Design and operating experience of the cryogenic system of the U. S. SCMS as incorporated into the bypass loop of the U-25 MHD generator facility  

DOE Green Energy (OSTI)

The design features and accumulated operating experience, from a cryogenics point of view, of the United States Superconducting Magnet System (U.S. SCMS) are presented. The principal cryogenic system design parameters are enumerated. Details of the cryogenic aspects of magnetic system commissioning, standby mode, and operation with MHD generators are discussed. Included are system operation, problems encountered and corrective actions taken, and measured operating parameters which include liquid helium boiloff, cryostat pressure and level versus time, etc. The aspects of the transition between operation in the laboratory and in an MHD plant are elaborated.

Niemann, R.C.; Mataya, K.F.; McWilliams, D.A.; Borden, R.; Streeter, M.H.; Wickson, R.; Smelser, P.; Privalov, N.P.

1978-01-01T23:59:59.000Z

260

Assist in the recovery of bypassed oil from reservoirs in the Gulf of Mexico. Quarterly status report (final), July 1--September 30, 1994  

SciTech Connect

The objective of this research is to assist the recovery of non contacted oil from known reservoirs on the Outer Continental Shelf in the Gulf of Mexico. Mature offshore reservoirs, declining oil reserves, declining production, and other natural forces are accelerating the abandonment of offshore oil resources and production platforms. As these offshore wells are plugged and the platforms are abandoned, an enormous volume of remaining oil will be permanently abandoned. Significant quantities of this oil could be recovered using advanced technologies now available if the resource can be identified. This project will proceed under three broad phases: (1) Analysis -- TORIS level data will be collected on the major fields located in the piercement salt dome province of the Gulf of Mexico Outer Continental Shelf. Representative reservoirs will be studied in detail in order to evaluate undeveloped and attic oil reserve potential. These detailed investigations will be used to calibrate the TORIS level predictive models. The recovery potential of advanced secondary and enhanced oil recovery processes and the exploitation of undeveloped and attic oil zones for salt dome reservoirs in the Gulf of Mexico will be assessed. (2) Supporting Research -- Supporting research will focus on the modification of public domain reservoir simulation models to accurately simulate the conditions encountered in the piercement salt dome province of the Gulf of Mexico. Laboratory research will focus on the development of fluid relationships that will be used in the simulation of miscible and immiscible processes in the project area. (3) Technology Transfer -- A significant effort is planned to transfer the results of this project to potential users of the technology. Technology transfer activities will also provide feedback channels that will help keep the analysis and supporting research focused on the most important problems associated with this project.

Schenewerk, P.A.

1994-11-30T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Recovery of bypassed oil in the Dundee Formation using horizontal drains, Quarterly technical report, 1/1/97--3/31/97  

SciTech Connect

This Class 11 field project has demonstrated that economic quantities of hydrocarbons can be produced from abandoned or nearly abandoned fields in the Dundee Formation of Central Michigan using horizontal drilling technology. The site selected for the demonstration horizontal well was Crystal Field, a nearly abandoned Dundee oil field in Montcalm County, Michigan. This field had produced over 8 million barrels of oil, mostly in the 1930`s and 1940`s. At the height of development, Crystal Field produced from 193 wells, but by 1995, only seven producing wells remained, each producing less than 10 bbls/day. A horizontal well, the TOW 1-3, drilled as a field demonstration pilot was successful, producing at rate of 100 bbls of oil per day with a zero water cut. Although the well is capable of producing at a rate of 500+ bbls/day, the production rate is being kept low deliberately to try to prevent premature water coning. Cumulative production exceeded 50,000 bbls of oil by the end of April, 1997 and lead to the permitting and licensing of several dozen Dundee wells by project end. Twelve of these permits were for continued development of Crystal Field. Two subsequent wells, the Frost 5-3 and the Happy Holidays 6-3, have not been as successful. Both are currently producing 10 BOPD with 90% water cut. Efforts are underway to determine why these wells are performing so poorly and to see if the situation can be remedied. The reasons for these poor performances of the new wells are not clear at this time. It is possible that the wells entered the Dundee too low and missed pay higher in the section. When the TOW 1-3 was drilled, a vertical probe well was also drilled and cored. That probe well penetrated the pay zone and helped guide the horizontal well. The important lesson may be that vertical probe wells are a crucial step in producing these old fields and should not be eliminated simply to save what amounts to a small incremental cost. Core and logs from the Dundee interval were recovered from a vertical borehole at the same surface location. The addition of several horizontal wells will likely add another 2 million bbls (or more) to the cumulative production of the field over the next few years. If other abandoned Dundee fields are re-developed in a similar manner, the additional oil produced could exceed 80 million barrels. Additional project work involved the characterization of 28 other Dundee fields in Michigan to aid in determining appropriate additional candidates for development through horizontal drilling. Further quantification of reservoir parameters such as importance of fracturing, fracture density, and irregularity of the dolomitized surface at the top of the reservoir will help in designing the optimal strategy for horizontal drilling. The project was a cooperative venture involving the US Department of Energy, Michigan Technological University (MTU), Western Michigan University (WMU), and Terra Energy (now Cronus Development Co.) in Traverse City, MI.

NONE

1997-03-30T23:59:59.000Z

262

Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2001-2002.  

DOE Green Energy (OSTI)

This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. OBJECTIVE 3--Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02 the final engineering was completed on this project. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. Project completion is expected in July 2003. OBJECTIVE 4--Assist the Farmers Irrigation District (FID) in construction and installation of a new fish screen and bypass system on the mainstem Hood River (Farmers Canal). Final engineering and design for the horizontal screen was completed during the winter of 2001. In December 2001 and January 2002, the concrete work was completed and the head gates were mounted. During the spring the secondary head level control gates were installed. In September 2002, the jersey barriers and vortex tubes were installed. These are located upstream of the old drum screen, and are the primary means of dealing with bedload and suspended load from the diversion. The screen surface was also installed in September 2002 and the system accommodated water soon after. Monitoring of these structures in regards to efficiency and possible effects to fish migration is scheduled to occur in spring 2003. The transition from the old canal to the new screen is smooth and currently does not present any problems. The old drum screen is going to remain in place until all the biological and hydrological monitoring is complete to ensure compliance and satisfaction of all agencies involved. OBJECTIVE 5--Assist the East Fork Irrigation District (EFID) in final engineering design and construction of the Central Lateral Canal upgrade and invert siphon. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02, a significant portion of the engineering and design work was completed on the EFID Central Lateral Canal upgrade and invert siphon. There were some changes in canal alignment that required further design work and easement acquisition. Time was also spent looking for matching funds and securing a loan by the EFID. Construction initiation is now scheduled for summer 2003. OBJECTIVE 6--Modify and/or eliminate five culverts, three on Baldwin Creek, one on Graham Creek, and one on Evans Creek, which function as barriers to upstream and downstream fish migration. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. There are only two culverts on Baldwin Creek that will be eliminated

Vaivoda, Alexis

2003-11-01T23:59:59.000Z

263

DEVELOPMENT AND MODEL FORMULATION OF SCALABLE CARBON NANOTUBE PROCESSES  

E-Print Network (OSTI)

, AC line reactor and manual bypass switch and contactors for interfacing with the Building Automation

Pike, Ralph W.

264

Trapping and Transportation of Adult and Juvenile Salmon in the Lower Umatilla River in Northeast Oregon, 1995-1996 : Umatilla River Basin Trap and Haul Program : Annual Progress Report, October 1995-September 1996.  

DOE Green Energy (OSTI)

Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were collected at Threemile Dam from September 5, 1995 to July 1, 1996. A total of 2,081 summer steelhead (Oncorhynchus mykiss); 603 adult, 288 jack, and 338 subjack fall chinook (O. tshawytscha); 946 adult and 53 jack coho (O. kisutch); and 2,152 adult and 121 jack spring chinook (O. tshawytscha) were collected. All fish were trapped at the east bank facility. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The Threemile Dam west bank juvenile bypass was operated from September 8 to October 13, 1995 and from March 18 to June 30, 1996. The juvenile trap was operated from July 1 to July 11. Daily operations at the facility were conducted by the ODFW Fish Passage Research project to monitor juvenile outmigration.

Zimmerman, Brian C.; Duke, Bill B.

1996-09-01T23:59:59.000Z

265

Mise en service du détecteur a pixels de l'expérience ATLAS auprés du LHC et étude du canal ttH, H -> bb pour la recherche du boson de Higgs.  

E-Print Network (OSTI)

??L'ajustement des differentes mesures electrofaibles dans le cadre du Modele Standard privilegie un boson de Higgs de faible masse egale a mH = 90 +36… (more)

Aad, G.

2009-01-01T23:59:59.000Z

266

INEEL/EXT-97-  

NLE Websites -- All DOE Office Websites (Extended Search)

that the oil bypass system can reduce life-cycle costs. As the evaluation continues and oil avoidance costs are quantified, it is estimated that the bypass system economics may...

267

Summary of Recommendations: Legislative and Regulatory Actions to Consider for Ensuring the Long-Term Effectiveness of the Nevada Renewable Portfolio Standard  

E-Print Network (OSTI)

availability is greatest or their cost is lowest; minimizing local permitting or land use conflicts; bypassing transmission

Porter, Kevin; Grace, Robert; Wiser, Ryan

2004-01-01T23:59:59.000Z

268

After a period of years spent in the pelagic environment, juvenile loggerhead (Caretta caretta) and green (Chelonia  

E-Print Network (OSTI)

in gill nets, skimmer trawls or in the cooling water intake canal at the Carolina Power & Light Nuclear

Lohmann, Kenneth J.

269

Enclosure 2. Studies Scheduled to Initiate Independent External Peer Review in FY11 Enclosure 2 Page 1 of 1  

E-Print Network (OSTI)

Canal Deepening, LA Howard Hanson Dam 902, WA Howard Hanson Dam, Dam Safety, WA Kalaeloa, Barbers Point

US Army Corps of Engineers

270

Undergraduate Course Changes effective for the 2012-2013 Academic Year This list of course additions, changes, and deletions has been approved by the University  

E-Print Network (OSTI)

in order to create a modern city. The Lake Biwa Canal and the Keage Hydroelectric Power Plant, covered

Raina, Ramesh

271

MARITIME ADMINISTRATION U.S. Department of Transportation  

E-Print Network (OSTI)

/rail connections as an alternative to Panama Canal/USEC #12; Increase in bulk vessel capacity will alter economies

US Army Corps of Engineers

272

Record of Decision for the Modification and Construction of Transmission Lines for the U.S. 93 Hoover Dam Bypass Project (DOE/EIS-0352) (10/1/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Federal Register / Vol. 67, No. 190 / Tuesday, October 1, 2002 / Notices ''Procedures for Public Participation in Power and Transmission Rate Adjustment,'' has been followed in connection with the proposed rate adjustment. More specifically, opportunities for public review and comment during a 90-day period on the proposed Rayburn power rate were announced by notice published in the Federal Register, May 21, 2002, 67 FR 35805. A Public Information Forum was scheduled to be held June 6, 2002, and a Public Comment Forum was scheduled to be held July 10, 2002, both in Tulsa, Oklahoma. Both forums were canceled as no one expressed an intent to participate. Written comments were due by August 19, 2002. Southwestern provided notice of the Federal Register,

273

~c'*-K :x"" ~~'i",~~ 1f~'~i~  

E-Print Network (OSTI)

Classification) Characterization of ~ater EXchange in Hydrilla-Infested Tidal Canals of the Crystal River and identify by block number) The freshwater, tidal canals of the Crystal River, Florida, have been infested MISCELLANEOUS PAPER A-91-2 CHARACTERIZATION OF WATER EXCHANGE IN HYDRILLA·INFESTED TIDAL CANALS OF THE CRYSTAL

US Army Corps of Engineers

274

SARAH PALIN, GOVERNOR  

E-Print Network (OSTI)

information on Lynn Canal herring as noticed in Federal Register Vol. 72, No. 174 dated September 10, 2007. Alaska Department of Fish and Game (ADF&G) fishery managers and State of Alaska scientists, after review of available information, found that the best available scientific and commercial information support a determination that listing of Lynn Canal herring under the Endangered Species Act (ESA) is not warranted for at least five separate reasons. 1. Lynn Canal herring do not represent a distinct population segment. There is no substantial information available that would support a contrary determination. Herring found in Lynn Canal are part of a larger herring metapopulation that includes all of Southeast Alaska and that may extend beyond Southeast Alaska. 2. Herring found in Lynn Canal are stable or increasing. There is no evidence that the herring in Lynn Canal are in danger of extinction within the foreseeable future. Recent surveys indicate that the

Ms. Kaja Brix

2007-01-01T23:59:59.000Z

275

NETL: News Release - DOE Selects Second Round of Projects to...  

NLE Websites -- All DOE Office Websites (Extended Search)

low-cost single-state fracture treatment is proposed. For damaged completions, where near well damage bypass is needed, low-cost propellant stimulation technology is proposed....

276

Attachment 12 - DB Maryland.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local...

277

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

energy.govcioarticlesv-005-modsecurity-multipart-message-parsing-security-bypass-vulnerability Download CX-010431: Categorical Exclusion Determination Rattlesnake-Garrison...

278

U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

There have been several proposals to build bypass options and reduce ... Gulf oil and gas shipments to Europe and North America. ... Petroleum Pipeline Co., ...

279

U-198: IBM Lotus Expeditor Multiple Vulnerabilities  

Energy.gov (U.S. Department of Energy (DOE))

The vulnerabilities can be exploited by malicious people to conduct cross-site scripting attacks, disclose potentially sensitive information, bypass certain security restrictions, and compromise a user's system..

280

V-163: Red Hat Network Satellite Server Inter-Satellite Sync...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Satellite server that could be reached, even if Inter-Satellite Sync support was disabled. IMPACT: A remote user can bypass authentication to gain access to all channel...

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

The Paleo Project - Fossil, Oregon by Jenny Young, Rowell Brokaw Architects [EDRA/Places Awards 2006 -- Planning  

E-Print Network (OSTI)

courtesy of Rowell Brokaw Architects. Top: Construction ofYoung, Rowell Brokaw Architects In an economically bypassedYoung and Rowell Brokaw Architects / Paleo Project 2006

Moffat, David

2006-01-01T23:59:59.000Z

282

U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Iran then delivers an equivalent amount of oil to potential buyers in the Persian Gulf, bypassing the challenge of getting Central Asian oil to global markets.

283

NETL: News Release - Leveling the Playing (Oil) Field For Small...  

NLE Websites -- All DOE Office Websites (Extended Search)

considerably more expensive than conventional methods, but is expected to reduce drilling costs, increase oil discovery rates, and improve the recovery of bypassed oil. Vecta...

284

INEEL/EXT-97-  

NLE Websites -- All DOE Office Websites (Extended Search)

4 U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Oil Bypass Filter Technology Evaluation Fourth Quarterly Report July-September 2003 TECHNICAL REPORT Larry...

285

INEEL/EXT-97-  

NLE Websites -- All DOE Office Websites (Extended Search)

620 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Evaluation Second Quarterly Report January - March 2003 Larry Zirker James Francfort...

286

Interactions of Lignin and Hemicellulose and Effects on Biomass Deconstruction  

E-Print Network (OSTI)

hydrolyzates in cellulosic biorefineries into high valuegreat promise for use in biorefineries on dry-lands and thethat the future biorefineries can bypass the lignocellulosic

Li, Hongjia

2012-01-01T23:59:59.000Z

287

Transluminal Treatment of a Celiac Artery Pseudoaneurysm with a Stent Graft Occlusion Device  

SciTech Connect

This report describes the transluminal placement of a stent graft occlusion device to treat a celiac bypass graft pseudoaneurysm which was causing biliary and duodenal obstruction.

Glickerman, David J.; Hathaway, Peter B. [Radiology Service (114), Seattle Division, Veterans Affairs Puget Sound Health Care System, 1660 S. Columbian Way, Seattle, WA 98108 (United States); Hatsukami, Thomas [Surgical Service, Seattle Division, Veterans Affairs Puget Sound Health Care System, 1660 S. Columbian Way, Seattle, WA 98108 (United States); Daly, Charles P.; Althaus, Sandra [Radiology Service (114), Seattle Division, Veterans Affairs Puget Sound Health Care System, 1660 S. Columbian Way, Seattle, WA 98108 (United States); Kohler, Ted R. [Surgical Service, Seattle Division, Veterans Affairs Puget Sound Health Care System, 1660 S. Columbian Way, Seattle, WA 98108 (United States)

1997-11-15T23:59:59.000Z

288

THE NEGATIVE IMPACT OF COLD WATER...  

NLE Websites -- All DOE Office Websites (Extended Search)

NEGATIVE IMPACT OF COLD WATER BYPASS ON SOLAR DOMESTIC HOT WATER SYSTEMS Final Report DRAFT Prepared for THE NEW YORK STATE ENERGY RESEARCH AND DEVELOPMENT AUTHORITY Albany, NY...

289

Requirements for low cost electricity and hydrogen fuel production from multi-unit intertial fusion energy plants with a shared driver and target factory  

E-Print Network (OSTI)

tritium (FVD) removal, steam generators (SG),steam turbines(to transfer heat to steam generators. This large bypass flowtransport system, and steam generators to be classified as

Logan, B. Grant; Moir, Ralph; Hoffman, Myron A.

1994-01-01T23:59:59.000Z

290

Formal Specification of Operating System Operations  

Science Conference Proceedings (OSTI)

... have specified high-level security policy models that can ... to bypass re-strictions the BLP model imposes and ... privileges listed in Table 1 or PV ROOT ...

2013-05-07T23:59:59.000Z

291

Formal Specification of Operating System Operations  

Science Conference Proceedings (OSTI)

... have specified high-level security policy models that can ... to bypass re- strictions the BLP model imposes and ... privileges listed in Table 1 or PV ROOT ...

2013-05-07T23:59:59.000Z

292

Distance-Based Classification of Handwritten Symbols - CECM  

E-Print Network (OSTI)

sures on a vector space representation of curves to elastic matching and ensem- bles of SVM. ...... bypass the learning stage and require very large training sets.

293

Activation of 200 MW refusegenerated CHP upward regulation effect...  

Open Energy Info (EERE)

References EU Smart Grid Projects Map1 Overview Waste CHP plants can be used in the electricity market for upward regulation by bypassing the steam turbine. The technical...

294

Method for Surge Recovery in Fuel Cell Turbine Hybrids Opportunity  

NLE Websites -- All DOE Office Websites (Extended Search)

of upset sensing and bypass flows. As examples, the auxiliary energy source may be a solar power concentrator or a thermal energy storage device. Power generation gas turbines...

295

U-031: Microsoft Active Directory CRL Validation Flaw Lets Remote...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directory CRL Validation Flaw Lets Remote Users Bypass Authentication. PLATFORM: Windows XP Service Pack 3 Windows XP Professional x64 Edition Service Pack 2 Windows Server...

296

T-536: Cisco ASA Multiple Flaws Let Remote Users Deny Service...  

NLE Websites -- All DOE Office Websites (Extended Search)

Service and Bypass Security Controls. PLATFORM: Cisco 5500 Series Adaptive Security Appliances (ASA) ABSTRACT: Cisco ASA 5500 Series Adaptive Security Appliances are affected by...

297

Microsoft Word - CX-Keeler-Tillamook Pole Stub_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

highway construction, allow for the construction of facilities such as canals and pipelines, or reduce existing impacts to environmentally sensitive areas. Proposed by:...

298

EIA - Daily Report 10/4/05 - Hurricane Impacts on U.S. Oil ...  

U.S. Energy Information Administration (EIA)

... and 1 shut down or attempting to restart in the Houston/Texas City /Galveston ... the Calcasieu Ship Channel and Industrial Canal have been ...

299

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014 600 E. Canal St., Ansonia, OH Ohio Advanced Transportation ProjectAnsonia Schools CNG Infrastructure Project Installation of CNG vehicle fueling system, including running a...

300

U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Wind › Geothermal › ... The area has significant oil and natural gas reserves from both offshore ... Companies must use canals from the Black Sea to move drilling ...

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Decision Process in a Water Use Conflict in Brazil  

Science Conference Proceedings (OSTI)

to 95% of the population living elsewhere in the Brazilian Territory. ..... interventions, for instance building embankments, canal rectification etc. as a feasible.

302

STEAM EXTRACTION OF POLYCYCLIC AROMATIC HYDROCARBONS AND LEAD FROM CONTAMINATED SEDIMENT USING SURFACTANT, SALT AND AKALINE CONDITIONS.  

E-Print Network (OSTI)

??The Indiana Harbor Canal sediments, containing a number of environmental contaminants, are a source of pollution to Lake Michigan, and will need to be dredged… (more)

WEINKAM, GRANT

2007-01-01T23:59:59.000Z

303

U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Energy use in homes, commercial buildings, ... State Energy Data System ... the Panama Canal Authority began an expansion program to be completed by the end of 2014.

304

Repurposing a Hydroelectric Plant.  

E-Print Network (OSTI)

??This thesis project explores repurposing a hydroelectric plant along Richmond Virginia's Canal Walk. The building has been redesigned to create a community-oriented space programmed as… (more)

Pritcher, Melissa

2008-01-01T23:59:59.000Z

305

S&TR | March 2004: Rich Legacy from Atoms for Peace  

NLE Websites -- All DOE Office Websites (Extended Search)

harbors, canals, and dams; stimulate natural gas reservoirs; or process underground oil shale into oil. Project Plowshare was terminated in 1977, primarily because of the...

306

ENERGY AND ENVIRONMENT DIVISION ANNUAL REPORT 1978  

E-Print Network (OSTI)

Waste Conversion and Cogeneration Systems R. Ritschard, K.municipal solid waste, cogeneration, marine biomass systemmotor efficiencies Cogeneration on distribution canals

Cairns, E.L.

2011-01-01T23:59:59.000Z

307

Geek-Up[09.10.10] -- Of Fuel Cells, Wind and Widgets | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9.10.10] -- Of Fuel Cells, Wind and Widgets 9.10.10] -- Of Fuel Cells, Wind and Widgets Geek-Up[09.10.10] -- Of Fuel Cells, Wind and Widgets September 10, 2010 - 6:16pm Addthis Idaho students learn about wind turbines; Source: Wind for Schools Idaho students learn about wind turbines; Source: Wind for Schools Niketa Kumar Niketa Kumar Public Affairs Specialist, Office of Public Affairs Idaho National Laboratory researcher Mark McKay has developed a desktop widget that displays real-time information from the Wind for Schools program, a DOE initiative at numerous schools across Idaho, Alaska, Kansas, Colorado and Nebraska that equips them with Streamline turbines. This widget gives students, teachers and researchers access to data from these turbines, including wind speed, watts produced and voltage.

308

Microsoft PowerPoint - TemplatesrnlTechBriefp1.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

NAPL Calculator NAPL Calculator at a glance  easy and quick  based on microsoft excel  guides clean-up decision making  works with soil, soil vapor, or groundwater samples The NAPL Calculator is an analytical model that is a self- executing Microsoft Excel workbook that requires qualitative/quantitative soil, groundwater, or soil vapor sample results and a few simple geotechnical parameters. A classic chemistry approach is used that is based on the work of Shiu, Feenstra, McKay and Cherry and is advocated by the U.S. Environmental Protection Agency. The method is known to many academics and researchers but not to many practitioners in environmental clean-up. Even for those who know the method, the calculation can be laborious. The NAPL Calculator is designed to make this

309

Secretary Chu's Remarks at the City Club of Cleveland -- As Prepared for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City Club of Cleveland -- As City Club of Cleveland -- As Prepared for Delivery Secretary Chu's Remarks at the City Club of Cleveland -- As Prepared for Delivery January 18, 2012 - 1:58pm Addthis Thank you, President Hugh McKay, for the introduction. It's great to be at the City Club of Cleveland as you celebrate 100 years of debate and discussion on the important issues facing the nation. It's fitting to give an energy speech in Cleveland, home of the country's first wind turbine to generate electricity and a city at the forefront of the clean energy economy. Today, I want to discuss the choice we face as a nation when it comes to competing in the global clean energy race. First, I want to go back in history to the birth of America's aviation industry. There are many nuances to this story that have important

310

Secretary Chu's Remarks at the City Club of Cleveland -- As Prepared for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu's Remarks at the City Club of Cleveland -- As Chu's Remarks at the City Club of Cleveland -- As Prepared for Delivery Secretary Chu's Remarks at the City Club of Cleveland -- As Prepared for Delivery January 18, 2012 - 1:58pm Addthis Thank you, President Hugh McKay, for the introduction. It's great to be at the City Club of Cleveland as you celebrate 100 years of debate and discussion on the important issues facing the nation. It's fitting to give an energy speech in Cleveland, home of the country's first wind turbine to generate electricity and a city at the forefront of the clean energy economy. Today, I want to discuss the choice we face as a nation when it comes to competing in the global clean energy race. First, I want to go back in history to the birth of America's aviation industry. There are many nuances to this story that have important

311

Retooling Michigan: 'Wheels' to Wind | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retooling Michigan: 'Wheels' to Wind Retooling Michigan: 'Wheels' to Wind Retooling Michigan: 'Wheels' to Wind July 21, 2010 - 10:12am Addthis This part from the inside of a wind turbine might someday generate clean, renewable energy. | Photo courtesy Merrill Technologies Group This part from the inside of a wind turbine might someday generate clean, renewable energy. | Photo courtesy Merrill Technologies Group Joshua DeLung "Traditionally, we made automotive products," says Scott McKay, General Manager for Merrill Technologies Group in Saginaw, Mich. "After several ups and downs in that industry, we've opened our eyes to finding ways to diversify our line of products, and one of those areas is in making renewable energy materials." Merrill is using $3 million awarded through the U.S. Department of

312

DOEINVIl0845-51 DC-703 GROUNDWATER FLOW NEAR THE SHOAL SITE,  

Office of Legacy Management (LM)

DOEINVIl0845-51 DOEINVIl0845-51 DC-703 GROUNDWATER FLOW NEAR THE SHOAL SITE, SAND SPRINGS RANGE, NEVADA: IMPACT OF DENSITY-DRIVEN FLOW Prepared by Jenny Chapman, Todd Mihevc, and Alan McKay Submitted to Nevada Operations Office U.S. Department of Energy Las Vegas, Nevada September 1994 Publication #45130 This report was prepared as an account of work sponsored by the United States Government Neither the United States nor the United States Department of Energy, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, mark, manufacturer, or otherwise, does not necessarily

313

Document Control Template-Process  

NLE Websites -- All DOE Office Websites (Extended Search)

1_ADocument Control Template - Process.doc Page 1 of 7 1_ADocument Control Template - Process.doc Page 1 of 7 EOTA - Business Process Document Title: Document Control Template - Process Document Number: F-001 Rev. A Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-001, Document Control Process Notify of Changes: EOTA Employees Referenced Document(s): N/A F-001_ADocument Control Template - Process.doc Page 2 of 7 Revision History: Rev. Description of Change A Initial Release B C D E F-001_ADocument Control Template - Process.doc Page 3 of 7 EOTA - Business Process Document Title: DocTitle Document Number: P-DocID# Rev Document Owner: Elizabeth Sousa Backup Owner: David McKay Approver(s): Dennis Murphy Parent Document:

314

Energy Storage Systems 2006 Peer Review - Day 2 morning presentations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Peer Review - Day 2 morning 6 Peer Review - Day 2 morning presentations Energy Storage Systems 2006 Peer Review - Day 2 morning presentations The 2006 Peer Review Meeting for the DOE Energy Storage Systems (ESS) Program was held in Washington DC on November 2-3, 2006. Current and completed program projects were presented and reviewed by a group of industry professionals. Presentations from the Day 2 morning session are below. ESS 2006 Peer Review - EESAT 2007 Conference Information - Georgianne Peek, SNL.pdf ESS 2006 Peer Review - Ultracapacitor EnergyBridge UPS - Chris McKay, Northern Power.pdf ESS 2006 Peer Review - Flywheel-based Frequency Regulation Demonstration Projects - Jim Arseneaux, Beacon Power.pdf ESS 2006 Peer Review - Design of the FESS 20MW Frequency Regulation Plant -

315

Recherche du boson de Higgs du Modèle Standard dans le canal de désintégration ZH->nu nu bb sur le collisionneur Tevatron dans l'expérience D0. Développement d'une méthode d'étiquetage des jets de quark b avec des muons de basses impulsions transverses.  

E-Print Network (OSTI)

??Dans le Modèle Standard de la physiques des particules, le boson de Higgs permet de générer la masse des particules élémentaires. Les contraintes théoriques et… (more)

Jamin, D.

2010-01-01T23:59:59.000Z

316

Recherche du boson de Higgs dans le canal $WH$ et étude de la production $Wb\\bar{b}$ dans les collisions $p\\bar{p}$ à 1.96 TeV dans l'expérience $D0$ auprès du Tevatron de Fermilab.  

E-Print Network (OSTI)

??L'introduction du boson de Higgs permet de résoudre le problème de l'origine de la masse des particules dans le modèle standard. A ce jour, il… (more)

Beauceron, Stéphanie

2004-01-01T23:59:59.000Z

317

Coastal Engineering Journal, Vol. 45, No. 4 (2003) 533563 c World Scientific Publishing Company and Japan Society of Civil Engineers  

E-Print Network (OSTI)

, North Carolina, after construction of the south jetty. #12;544 W. C. Seabergh & N. C. Kraus sand tight and how spurs can be designed to alter sediment bypassing. Keywords: Coastal inlets; sand bypassing; weir; Richardson, 1991). Hereafter, such sediment will be assumed to consist primarily of sand (and perhaps gravel

US Army Corps of Engineers

318

Geomorphology, 4 (1991) 125-144 Elsevier Science Publishers B.V., Amsterdam  

E-Print Network (OSTI)

). Other studies have used heavy minerals to identify provenance (Blatt, 1967; Stattegger, 1986 of roads, canals, and the Southern Pacific Railroad, and extra-basin imports of water for mining. Based of roads, canals, and railroads, were more important than previously assumed. Differences in tailings

James, L. Allan

319

members of the Biological Review Team  

E-Print Network (OSTI)

i Acknowledgements This document was prepared at the request of the Regional Office of the National Marine Fisheries Service. The purpose is to review the status of Lynn Canal herring and to determine if Lynn Canal herring are a distinct population segment of Pacific herring as defined by the

Mark G. Carls; Scott W. Johnson; Mandy R. Lindeberg; A. Darcie Neff; Pat M. Harris; Auke Bay Laboratories; Robin Waples; Mark G. Carls; Jeffrey T. Fujioka; Richard G. Gustafson; Scott W. Johnson; Erika Phillips; Stanley D. Rice; Johanna Vollenweider; Robin S. Waples; Bruce L. Wing; Jamie N. Womble

2008-01-01T23:59:59.000Z

320

Relationship between teat end callosity and incidence of clinical mastitis  

E-Print Network (OSTI)

The teat canal is the primary physical and chemical barrier to invasion of mastitis pathogens into the udder (Hamann, 1987). The smooth muscles surrounding the teat duct should be contracted and the teat canal tightly closed between milkings to impede bacterial passage from the teat orifice into the interior of the gland (Nickerson, 1994). A teat-end in good

F. Neijenhuis; G. A. Mein; J. S. Britt; D. J Reinemann; J. E. Hillerton; R. Farnsworth; J. R. Baines; T. Hemling; I. Ohnstad; N. B. Cook; W. F. Morgan

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Umatilla Basin Natural Production Monitoring and Evaluation; 1995-1996 Annual Report.  

DOE Green Energy (OSTI)

This report summarizes the activities of the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME) from September 30, 1995 to September 29, 1996. This program was funded by Bonneville Power Administration and was managed under the Fisheries Program, Department of Natural Resources, Confederated Tribes of the Umatilla Indian Reservation. The goal was to evaluate the implementation of the Umatilla River Basin fisheries restoration plan with respect to natural production, adult passage, and tribal harvest. An estimated 56.1 river miles (RM) of habitat was inventoried on the lower Umatilla River (RM 0--56.1) from June 4, to August 1, 1996. The majority of the lower River was found to be too polluted and physically altered to provide suitable rearing or migration habitat for salmonids during the summer. High water temperatures, irrigation withdrawals, altered channels, and urban and agricultural pollution all contributed to degrade the lower Umatilla River. Small springs provided cooler waters and created small areas that were suitable for salmonid rearing. The river below the mouth of Mckay Creek (RM 27.2 to 50.6) was also cooler and more suitable to salmonid rearing when water was released from Mckay Dam. Two hundred sixty-three of 1,832 (14.4%) habitat units were electrofished from June 19 to August 29, 1996. The number of natural juvenile salmonids captured between RM 1.5--52.4 follow: (1) 141 juvenile steelhead (including resident rainbow trout; Oncoryhnchus mykiss), (2) 13 mountain whitefish (Prosopium williamsoni, including adults), (3) four chinook salmon (O. tshawytscha), and (4) two coho salmon (O. kisutch). The expanded population estimate for the areas surveyed was 2,445 salmonids. Mean density was 0.147 salmonids/100 square meter. Mean density of fast water habitat types was 4.5 times higher than slow water types (0.358 and 0.079 s/100 m{sup 2}).

Contor, Craig R.; Kissner, Paul; Volkman, Jed [Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR (United States). Dept. of Natural Resources

1997-08-01T23:59:59.000Z

322

Staged venting of fuel cell system during rapid shutdown  

DOE Patents (OSTI)

A venting methodology and system for rapid shutdown of a fuel cell apparatus of the type used in a vehicle propulsion system. H.sub.2 and air flows to the fuel cell stack are slowly bypassed to the combustor upon receipt of a rapid shutdown command. The bypass occurs over a period of time (for example one to five seconds) using conveniently-sized bypass valves. Upon receipt of the rapid shutdown command, the anode inlet of the fuel cell stack is instantaneously vented to a remote vent to remove all H.sub.2 from the stack. Airflow to the cathode inlet of the fuel cell stack gradually diminishes over the bypass period, and when the airflow bypass is complete the cathode inlet is also instantaneously vented to a remote vent to eliminate pressure differentials across the stack.

Clingerman, Bruce J. (Palmyra, NY); Doan, Tien M. (Columbia, MD); Keskula, Donald H. (Webster, NY)

2002-01-01T23:59:59.000Z

323

Fuel cell system shutdown with anode pressure control  

DOE Patents (OSTI)

A venting methodology and pressure sensing and vent valving arrangement for monitoring anode bypass valve operating during the normal shutdown of a fuel cell apparatus of the type used in vehicle propulsion systems. During a normal shutdown routine, the pressure differential between the anode inlet and anode outlet is monitored in real time in a period corresponding to the normal closing speed of the anode bypass valve and the pressure differential at the end of the closing cycle of the anode bypass valve is compared to the pressure differential at the beginning of the closing cycle. If the difference in pressure differential at the beginning and end of the anode bypass closing cycle indicates that the anode bypass valve has not properly closed, a system controller switches from a normal shutdown mode to a rapid shutdown mode in which the anode inlet is instantaneously vented by rapid vents.

Clingerman, Bruce J. (Palmyra, NY); Doan, Tien M. (Columbia, MD); Keskula, Donald H. (Webster, NY)

2002-01-01T23:59:59.000Z

324

Method for supplying heat to an engine for external heat supply by intermittent combustion, and engine for carrying out the method  

SciTech Connect

This patent describes a reheat steam power plant including a turbine bypass system. The power plant comprises a boiler having a superheater and a reheater therein, a high pressure stream turbine driven by steam generated in the superheater and supplied through a main steam pipe and a first control valve means for controlling a flow of the steam through the main steam pipe. It also consists of a reheat steam turbine driven by reheat heated up in the reheater and conducted through a hot reheat steam pipe, a second control valve means for controlling a flow of steam through the hot reheat steam pipe, a condenser for condensing the reheat steam exhausted from the reheat steam turbine, and a cold reheat steam pipe connecting an outlet of the high pressure steam turbine with an inlet of the reheater. Plus a check valve means is disposed in the cold reheat steam pipe, a condensate pipe means for connecting the condenser with an upstream side of the superheater, a high pressure turbine bypass pipe means for connecting the main steam pipe with the cold reheat steam pipe, a turbine bypass valve disposed in the high pressure turbine bypass pipe, and means for reducing the quantity of the reheat steam introduced into the reheater from the superheater through the high pressure turbine bypass pipe means and for discharging an excess steam from the high pressure turbine bypass pipe means and the cold reheat steam pipe when the high pressure turbine bypass means is operated.

Hoizumi, S.; Abe, N.; Ueno, T.; Arakawa, T.; Hodozuka, K.

1987-09-15T23:59:59.000Z

325

Method and apparatus for starting supersonic compressors  

DOE Patents (OSTI)

A supersonic gas compressor. The compressor includes aerodynamic duct(s) situated on a rotor journaled in a casing. The aerodynamic duct(s) generate a plurality of oblique shock waves for efficiently compressing a gas at supersonic conditions. The convergent inlet is adjacent to a bleed air collector, and during acceleration of the rotor, bypass gas is removed from the convergent inlet via a collector to enable supersonic shock stabilization. Once the oblique shocks are stabilized at a selected inlet relative Mach number and pressure ratio, the bleed of bypass gas from the convergent inlet via the bypass gas collectors is eliminated.

Lawlor, Shawn P. (Bellevue, WA)

2012-04-10T23:59:59.000Z

326

EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA  

Energy.gov (U.S. Department of Energy (DOE))

DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington.

327

T-570: HP Security Bulletin - HP-UX Running OpenSSL, Remote Execution of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: HP Security Bulletin - HP-UX Running OpenSSL, Remote 0: HP Security Bulletin - HP-UX Running OpenSSL, Remote Execution of Arbitrary Code, Denial of Service (DoS), Authentication Bypass T-570: HP Security Bulletin - HP-UX Running OpenSSL, Remote Execution of Arbitrary Code, Denial of Service (DoS), Authentication Bypass March 4, 2011 - 3:05pm Addthis PROBLEM: Potential Security Impact: Remote execution of arbitrary code, Denial of Service (DoS), authentication bypass. PLATFORM: HP-UX B.11.11, B.11.23, B.11.31 running OpenSSL before vA.00.09.08q. ABSTRACT: A potential security vulnerability has been identified with HP-UX OpenSSL. This vulnerability could be exploited remotely to execute arbitrary code or create a Denial of Service (DoS) or an authentication bypass. reference LINKS: Net-Security Advisory: HPSBUX02638

328

JC3 Medium Impact Assessment Bulletins | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Medium Impact Medium Impact Assessment Bulletins JC3 Medium Impact Assessment Bulletins RSS September 9, 2013 V-237: TYPO3 Security Bypass Vulnerabilities TYPO3 comes with the possibility to restrict editors to certain file actions (copy, delete, move etc.) and to restrict these actions to be performed in certain locations September 4, 2013 V-234: EMC RSA Archer GRC Open Redirection Weakness and Security Bypass Security Issue This fixes multiple vulnerabilities, which can be exploited to bypass certain security restrictions and to conduct spoofing attacks September 3, 2013 V-233: Red Hat update for JBoss Fuse This fixes multiple vulnerabilities, which can be exploited by malicious people to bypass certain security restrictions and cause a DoS. August 28, 2013 V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting

329

V-026: RSA Data Protection Manager Bugs Permit Cross-Site Scripting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions V-026: RSA Data Protection Manager Bugs Permit Cross-Site...

330

NLC Pulsed Extraction  

NLE Websites -- All DOE Office Websites (Extended Search)

which transports 250 GeV beams from the main linac to the parallel bypass line. The design is, at least in principle, compatible with extraction of 60 bunch trains per second...

331

JC3 Bulletin Archive  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

bulletin-archive Office of bulletin-archive Office of the Chief Information Officer 1000 Independence Ave., SW Washington, DC 202-586-0166 en V-237: TYPO3 Security Bypass Vulnerabilities http://energy.gov/cio/articles/v-237-typo3-security-bypass-vulnerabilities bypass-vulnerabilities" class="title-link">V-237: TYPO3 Security Bypass Vulnerabilities

332

T-570: HP Security Bulletin - HP-UX Running OpenSSL, Remote Execution of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70: HP Security Bulletin - HP-UX Running OpenSSL, Remote 70: HP Security Bulletin - HP-UX Running OpenSSL, Remote Execution of Arbitrary Code, Denial of Service (DoS), Authentication Bypass T-570: HP Security Bulletin - HP-UX Running OpenSSL, Remote Execution of Arbitrary Code, Denial of Service (DoS), Authentication Bypass March 4, 2011 - 3:05pm Addthis PROBLEM: Potential Security Impact: Remote execution of arbitrary code, Denial of Service (DoS), authentication bypass. PLATFORM: HP-UX B.11.11, B.11.23, B.11.31 running OpenSSL before vA.00.09.08q. ABSTRACT: A potential security vulnerability has been identified with HP-UX OpenSSL. This vulnerability could be exploited remotely to execute arbitrary code or create a Denial of Service (DoS) or an authentication bypass. reference LINKS: Net-Security Advisory: HPSBUX02638

333

JC3 Bulletin Archive | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Bulletin Archive Bulletin Archive JC3 Bulletin Archive RSS September 9, 2013 V-237: TYPO3 Security Bypass Vulnerabilities TYPO3 comes with the possibility to restrict editors to certain file actions (copy, delete, move etc.) and to restrict these actions to be performed in certain locations September 6, 2013 V-236: MediaWiki CentralAuth Extension Authentication Bypass Vulnerability A vulnerability has been reported in the CentralAuth extension for MediaWik that allows people to bypass certain security restrictions September 5, 2013 V-235: Cisco Mobility Services Engine Configuration Error Lets Remote Users Login Anonymously A vulnerability was reported in Cisco Mobility Services Engine where a remote user can login anonymously. September 4, 2013 V-234: EMC RSA Archer GRC Open Redirection Weakness and Security Bypass

334

Microsoft Word - P05-00181 - Main Report.DOC  

NLE Websites -- All DOE Office Websites (Extended Search)

to eight hydroelectric projects during their downstream migration to the Pacific Ocean. Fish may pass a project through a turbine or a spillbay or be screened into a bypass system...

335

Reducing Mortality from Terrorist Releases of Chemical and Biological Agents: I. Filtration for Ventilation Systems in Commercial Building  

E-Print Network (OSTI)

be obtained by sealing the ductwork to prevent air leakage.sealing may also be important for minimizing transport of untreated airair which bypasses the filter is essentially unreduced. Therefore, leak sealing

Thatcher, Tracy L.

2011-01-01T23:59:59.000Z

336

Assessment of propfan propulsion systems for reduced environmental impact  

E-Print Network (OSTI)

Current aircraft engine designs tend towards higher bypass ratio, low-speed fan designs for improved fuel burn, reduced emissions and noise. Alternative propulsion concepts include counter-rotating propfans (CRPs) which ...

Peters, Andreas, S.M. Massachusetts Institute of Technology

2010-01-01T23:59:59.000Z

337

Low-Frequency Sonophoresis: Application to the Transdermal Delivery of Macromolecules and Hydrophilic Drugs  

E-Print Network (OSTI)

Importance of the field: Transdermal delivery of macromolecules provides an attractive alternative route of drug administration when compared to oral delivery and hypodermic injection because of its ability to bypass the ...

Polat, Baris E.

338

A “Balanced” Approach to Stable Boundary Layer Dynamics  

Science Conference Proceedings (OSTI)

Semiempirical arguments from Roach and Nieuwstadt concerning Richardson numbers Ri, Rf in stably stratified shear layers and boundary layers appear to bypass uncertainties of turbulence closures. Here it is shown that these arguments can be ...

S. H. Derbyshire

1994-12-01T23:59:59.000Z

339

Expeditious Data Center Sustainability, Flow, and Temperature Modeling: Life-Cycle Exergy Consumption Combined with a Potential Flow Based, Rankine Vortex Superposed, Predictive Method  

E-Print Network (OSTI)

strategy bypasses the vapor- compression cycle of the CRACis based on the same vapor-compression refrigeration cycle4.1, which shows the vapor-compression refrig- eration cycle

Lettieri, David

2012-01-01T23:59:59.000Z

340

A low-power cochlear implant system  

E-Print Network (OSTI)

Cochlear implants, or bionic ears, restore hearing to the profoundly deaf by bypassing missing inner-ear hair cells in the cochlea and electrically stimulating the auditory nerve. For miniaturized cochlear implants, including ...

Baker, Michael W. (Michael Warren), 1977-

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

... increase to 4.3 million bbl/d by the end of this year, as both countries have recently completed steps to increase standby pipeline capacity to bypass the ...

342

V-200: Apache Struts DefaultActionMapper Redirection and OGNL...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

tcher.mapper.DefaultActionMapper) can be exploited to e.g. inject and execute arbitrary Java code via OGNL (Object-Graph Navigation Language) expressions. IMPACT: Security Bypass...

343

V-002: EMC NetWorker Module for Microsoft Applications Lets Remote...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Network LDAP Authentication Bug Lets Remote Users Bypass Authentication V-104: Oracle Java Flaw Lets Remote Users Execute Arbitrary Code T-699: EMC AutoStart Buffer Overflows Let...

344

Microsoft Word - AOCS Australasian Section_ May 2008_finalv2.docm  

Science Conference Proceedings (OSTI)

Australasian Section, American Oil Chemist Society May 2008, Newsletter In this issue: From the President Industry Updates ? Heritability Estimates of Individual Fatty Acids in Merino Meat Reported ? Olive Oil Helps Bypass Patients ? Th

345

The optimization of situational awareness for insider threat detection  

Science Conference Proceedings (OSTI)

In recent years, organizations ranging from defense and other government institutions to commercial enterprises, research labs, etc., have witnessed an increasing amount of sophisticated insider attacks that manage to bypass existing security controls. ... Keywords: data exfiltration, insider threat

Kenneth Brancik; Gabriel Ghinita

2011-02-01T23:59:59.000Z

346

JC3 Medium Impact Assessment Bulletins  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

medium-impact-assessment-bulletins medium-impact-assessment-bulletins Office of the Chief Information Officer 1000 Independence Ave., SW Washington, DC 202-586-0166 en V-237: TYPO3 Security Bypass Vulnerabilities http://energy.gov/cio/articles/v-237-typo3-security-bypass-vulnerabilities bypass-vulnerabilities" class="title-link">V-237: TYPO3 Security Bypass Vulnerabilities

347

RMOTC_WO2008.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

The flowline was modified to allow installation of a flowmeter and Barton Meter pressure chart recorders. A production bypass was installed to main- tain flow while each unit was...

348

ON SCIENCE AND PSEUDOSCIENCE JASON ROSENHOUSE  

E-Print Network (OSTI)

Im- manuel Velikovsky. He writes, "He was wrong in many ways, but he was not a fraud or deliberate charlatan. He wasn't peddling snake oil or disingenuous tax cuts." (156) When a man bypasses the informed

Rosenhouse, Jason D.

349

Microsoft Word - DOE-ID-INL-12-003.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-12-003 EC Document No.: DOE-ID-INL-12-003 SECTION A. Project Title: Auxiliary Canal Fill Project at Test Reactor Area (TRA)-670 SECTION B. Project Description: Although the ATR canal meets all design basis criteria, lessons learned following the earthquake and tsunami events at the Fukushima- Daiichi Nuclear Power Plant in March of 2011 indicate that an auxiliary water supply to the fuel storage canal with a fill connection located outside of the facility would have been valuable following the beyond design basis event. As a result of these lessons learned, the Department of Energy (DOE) has allocated additional funding to the Idaho National Laboratory (INL) to mitigate beyond design basis events similar to the Fukushima-Daiichi disaster. The Auxiliary Canal Fill Project is one of the projects being funded from this

350

Mixed waste removal from a hazardous waste storage tank  

Science Conference Proceedings (OSTI)

The spent fuel transfer canal at the Oak Ridge Graphite Reactor was found to be leaking 400 gallons of water per day into the surrounding soil. Sampling of the sediment layer on the floor of the canal to determine the environmental impact of the leak identified significant radiological contamination and elevated levels of cadmium and lead which are hazardous under the Resource Conservation and Recovery Act (RCRA). Under RCRA regulations and Rules of Tennessee Department of Environment and Conservation, the canal was considered a hazardous waste storage tank. This paper describes elements of the radiological control program established in support of a fast-track RCRA closure plan that involved underwater mapping of the radiation fields, vacuuming, and ultra-filtration techniques that were successfully used to remove the mixed waste sediments and close the canal in a method compliant with state and federal regulations.

Geber, K.R.

1993-06-01T23:59:59.000Z

351

Microsoft Word - DOE-ID-INL-11-004.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

04 04 SECTION A. Project Title: ATR Canal AFIP-7 Channel Gap Probe Installation Project SECTION B. Project Description: The location for the proposed project is the Advanced Test Reactor (ATR) at the ATR Complex, located at the Idaho National Laboratory (INL). This project involves the following primary efforts: * Installation of the channel gap probe instrument into the East end of the ATR canal o Bolting together two pieces of the assembly o Lifting the channel gap probe into the canal o Termination of cables * Fabrication and installation of a new skimmer bracket - the skimmer will be moved to a location on the North side of the parapet from its current location on the far East side of the parapet o Metal machining and welding o Physical removal and reconfiguration of skimmer bracket in canal area

352

Microsoft Word - DOE-ID-INL-11-004.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04 04 SECTION A. Project Title: ATR Canal AFIP-7 Channel Gap Probe Installation Project SECTION B. Project Description: The location for the proposed project is the Advanced Test Reactor (ATR) at the ATR Complex, located at the Idaho National Laboratory (INL). This project involves the following primary efforts: * Installation of the channel gap probe instrument into the East end of the ATR canal o Bolting together two pieces of the assembly o Lifting the channel gap probe into the canal o Termination of cables * Fabrication and installation of a new skimmer bracket - the skimmer will be moved to a location on the North side of the parapet from its current location on the far East side of the parapet o Metal machining and welding o Physical removal and reconfiguration of skimmer bracket in canal area

353

The Des Plaines River -- Part Two  

NLE Websites -- All DOE Office Websites (Extended Search)

a canal through the Chicago Portage, down the Des Plaines valley, and thence to LaSalle-Peru where the Illinois River became navigable in all seasons. The Northwest Territory...

354

Digital ear scanner : measuring the compliance of the ear  

E-Print Network (OSTI)

This paper seeks to resolve the biggest problem with hearing aids, their physical fit. By digitally scanning the ear canal and taking the dynamics of the ear into account the performance and comfort of a hearing aid can ...

Hernandez-Stewart, Daniel

2010-01-01T23:59:59.000Z

355

A Model for the Formation and Melting of Ice on Surface Waters  

Science Conference Proceedings (OSTI)

Ice covers have an important influence on the hydrology of surface waters. The growth of ice layer on stationary waters, such as lakes or canals, depends primarily on meteorological parameters like temperature and humidity of the air, windspeed ...

H. A. R. De Bruin; H. R. A. Wessels

1988-02-01T23:59:59.000Z

356

Does it Hold Water? Repudiating the "Singular Entity" or "Unitary Waters" Approach to the Clean Water Act  

E-Print Network (OSTI)

project was flood control, water conservation, and drainage.LAW [Vol. 23:101 rejoin the waters of the canal. 77 Thequality in both individual water bodies and the waters of

Sattizahn, Gregory L.

2005-01-01T23:59:59.000Z

357

CX-008212: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Development of Project on North Unit Irrigation District's Main Canal at Monroe Drop CX(s) Applied: A9 Date: 04/11/2012 Location(s): Oregon Offices(s): Golden Field Office

358

Panama - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Country Analysis Note. Panama is not a large producer or consumer of energy, but merits attention as an energy transit point due to its control over the Panama Canal ...

359

A Spatial-Temporal Representation of Land  

E-Print Network (OSTI)

control structures, well casings, gas and water pipes, transmission lines, electric and gas substations, and sewer lines), flow reversal in drains, sewers, canals, irrigation systems, and aquifers and ground

Hall, Sharon J.

360

U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

In order to make the canal more accessible, ... U.S. Department of Energy USA.gov FedStats. Stay Connected Facebook Twitter YouTube Email Updates

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Built waterfront through edge, connection, and exchange : reclaiming a waterfront for Greenpoint, a project in Brooklyn, N.Y.  

E-Print Network (OSTI)

Currently the waterfront of Brooklyn N.Y. between the Gowanus Canal of Redhook and the Newton Creek of Greenpoint is predominantly lined with various types of industrial and manufacturing uses. Scattered throughout are ...

Ziesemann, Rodney P. (Rodney Paul), 1967-

1998-01-01T23:59:59.000Z

362

10 NPP Data Sets Updated  

NLE Websites -- All DOE Office Websites (Extended Search)

Consistent Worldwide Site Estimates, 1965-1995, R1 NPP Boreal Forest: Canal Flats, Canada, 1984, R1 NPP Boreal Forest: Flakaliden, Sweden, 1986-1996,R1 NPP Boreal Forest:...

363

Stirling engine power control  

DOE Patents (OSTI)

A power control method and apparatus for a Stirling engine including a valved duct connected to the junction of the regenerator and the cooler and running to a bypass chamber connected between the heater and the cylinder. An oscillating zone of demarcation between the hot and cold portions of the working gas is established in the bypass chamber, and the engine pistons and cylinders can run cold.

Fraser, James P. (Scotia, NY)

1983-01-01T23:59:59.000Z

364

Combined cycle electric power plant and heat recovery steam generator having improved multi-loop temperature control of the steam generated  

SciTech Connect

A combined cycle electric power plant is described that includes gas and steam turbines and a steam generator for recovering the heat in the exhaust gases exited from the gas turbine and for using the recovered heat to produce and supply steam to the steam turbine. The steam generator includes a superheater tube and a steam drum from which heated steam is directed through the superheater to be additionally heated into superheated steam by the exhaust gas turbine gases. An afterburner serves to further heat the exhaust gas turbine gases passed to the superheater tube and a bypass conduit is disposed about the superheater tube whereby a variable steam flow determined by a bypass valve disposed in the bypass conduit may be directed about the superheater tube to be mixed with the superheated steam therefrom, whereby the temperature of the superheated steam supplied to the steam turbine may be accurately controlled. Steam temperature control means includes a first control loop responsive to the superheated steam temperature for regulating the position of the bypass valve with respect to a first setpoint, and a second control loop responsive to the superheated steam temperature for controlling the fuel supply to the afterburner with respect to a second setpoint varying in accordance with the bypass valve position. In particular, as the bypass valve position increases, the second setpoint, originally higher, is lowered toward a value substantially equal to that of the first setpoint.

Martz, L.F.; Plotnick, R.J.

1976-08-17T23:59:59.000Z

365

Apparatus and method for controlling steam turbine operating conditions during starting and loading  

SciTech Connect

A steam turbine-generator system is described which consists of: a high-pressure steam turbine; a reheat turbine; a boiler including means for heating stem for delivery to the high-pressure steam turbine and a boiler reheat portion for reheating an exhaust steam from the high-pressure steam turbine for delivery to the reheat turbine; main valve means for admitting steam from the boiler to the high-pressure steam turbine; an intercept control valve for admitting steam from the boiler reheat portion to the reheat turbine; means for maintaining at least a selectable predetermined pressure in the boiler reheat portion; a reheater bypass assembly connected between a high-pressure turbine exhaust line of the high-pressure steam turbine and a reheat turbine inlet line of the reheat turbine, the reheater bypass assembly bypassing the reheat portion and the intercept control valve; a check valve in the high-pressure turbine exhaust line downstream of the reheater bypass assembly; and the check valve including means for preventing a flow of steam from the high-pressure turbine exhaust line to the reheat portion while an exhaust pressure of steam from the high-pressure steam turbine is less than the selectable predetermined pressure, whereby exhaust steam from the high pressure steam turbine passes through the reheater bypass assembly directly to the reheat turbine without passing through and reheat portion during at least a portion of a startup cycle.

Dimitroff, V.T. Jr.; Wagner, J.B.

1986-07-08T23:59:59.000Z

366

JC3 Bulletin Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2012 28, 2012 U-246: Tigase XMPP Dialback Protection Bypass Vulnerability A vulnerability has been reported in Tigase, which can be exploited by malicious people to bypass certain security restrictions. August 27, 2012 U-245: Critical Java 0-day flaw exploited Targeted attacks exploiting a zero-day Java vulnerability to deliver the Poison Ivy RAT onto the unsuspecting victims' machines August 27, 2012 U-244: McAfee Email Gateway Lets Remote Users Bypass Authentication and Conduct Cross-Site Scripting and Directory Traversal Attacks Several vulnerabilities were reported in McAfee Email Gateway. August 24, 2012 U-243: libvirt virTypedParameterArrayClear() Memory Access Error Lets Remote Users Deny Service A vulnerability was reported in libvirt. August 23, 2012 U-242: Linux Kernel Netlink SCM_CREDENTIALS Processing Flaw Lets Local

367

Field App. 6.5  

NLE Websites -- All DOE Office Websites (Extended Search)

Cambria Valve Corporation has Cambria Valve Corporation has developed a three-port Automatic Shut- down Valve (ASDV), which is designed to automatically stop fluid flow through an hydraulic system when a line ruptures and safely redirect the flow to a bypass or redundant system. The ASDV incorporates three ports-inlet, outlet, and bypass. When the ASDV senses a rupture at the outlet port, it immediately diverts flow to the bypass port and blocks flow through the ruptured line. This design prevents the system from over-pressuring and causing further equipment damage. Operators can apply the ASDV on all types of hydrualically-operated oilfield equipment and safety systems. The ASDV can be configured with visual and audible alarms to annuciate system failures. The valve can also be configured to automati-

368

T-580: Apache Tomcat May Ignore @ServletSecurity Annotation Protections |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Apache Tomcat May Ignore @ServletSecurity Annotation 0: Apache Tomcat May Ignore @ServletSecurity Annotation Protections T-580: Apache Tomcat May Ignore @ServletSecurity Annotation Protections March 16, 2011 - 3:05pm Addthis PROBLEM: Apache Tomcat could allow a remote attacker to bypass security restrictions, caused by an error related to ignoring @ServletSecurity annotations. An attacker could exploit this vulnerability to bypass security restrictions and launch further attacks on the system. PLATFORM: Apache Tomcat versions 7.0.0 through 7.0.10. ABSTRACT: Apache Tomcat May Ignore @ServletSecurity Annotation Protections. A remote user may be able to bypass @ServletSecurity annotation protections. reference LINKS: Apache Tomcat Advisory: Apache Tomcat 7.0.11 CVE-2011-1088 Security Tracker Alert ID:1025215 OSVDB ID: 71027

369

EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

490: Boulder City/U.S. 93 Corridor Transportation 490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, Nevada EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, Nevada SUMMARY The Federal Highway Administration and the Nevada Department of Transportation prepared an EIS to evaluate the potential environmental impacts of the proposed Boulder City/U.S. 93 Bypass Project in Boulder County, Nevada. DOE's Western Area Power Administration, a cooperating agency, adopted the Final EIS and issued a Record of Decision to modify Western's transmission system and facilities to accommodate the construction of the project. The project website is http://www.nevadadot.com/Micro-Sites/BoulderCityBypass/The_Boulder_City_Bypass.aspx. PUBLIC COMMENT OPPORTUNITIES

370

JC3 Medium Impact Assessment Bulletins | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 6, 2012 November 6, 2012 V-017: Apache Tomcat Security Bypass and Denial of Service Vulnerabilities Two vulnerabilities were reported in Apache Tomcat October 23, 2012 V-008: Debian Security Advisory Debian update for bind9 October 22, 2012 V-007: McAfee Firewall Enterprise ISC BIND Record Handling Lockup Vulnerability McAfee has acknowledged a vulnerability in McAfee Firewall Enterprise, which can be exploited by malicious people to cause a DoS (Denial of Service). October 18, 2012 V-005: ModSecurity Multipart Message Parsing Security Bypass Vulnerability SEC Consult has reported a vulnerability in ModSecurity, which can be exploited by malicious people to bypass certain security restrictions. October 15, 2012 V-002: EMC NetWorker Module for Microsoft Applications Lets Remote Users

371

V-015: Apple iOS Bugs Let Remote Users Execute Arbitrary Code, Local Users  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Apple iOS Bugs Let Remote Users Execute Arbitrary Code, 5: Apple iOS Bugs Let Remote Users Execute Arbitrary Code, Local Users Bypass the Screen Lock, and Applications Obtain Kernel Address Information V-015: Apple iOS Bugs Let Remote Users Execute Arbitrary Code, Local Users Bypass the Screen Lock, and Applications Obtain Kernel Address Information November 2, 2012 - 6:00am Addthis PROBLEM: Apple iOS Bugs Let Remote Users Execute Arbitrary Code, Local Users Bypass the Screen Lock, and Applications Obtain Kernel Address Information PLATFORM: Apple iOS prior to 6.0.1 ABSTRACT: Three vulnerabilities were reported in Apple iOS. REFERENCE LINKS: Apple Article: HT5567 SecurityTracker Alert ID: 1027716 Bugtraq ID: 56363 CVE-2012-3748 CVE-2012-3749 CVE-2012-3750 IMPACT ASSESSMENT: High DISCUSSION: A remote user can create specially crafted HTML that, when loaded by the

372

Steam turbine plant  

SciTech Connect

A system for regulating the rate of closing of the turbine intake valve of a steam turbine plant is disclosed. A steam turbine is supplied from a steam generator through a turbine intake valve. A branch line conducts the steam to a bypass valve which is normally closed. In the event of conditions making it necessary to close the turbine intake valve rapidly, a regulator is provided to control the rate of closing of the turbine intake valve and the opening of the bypass valve so that the pressure conditions in the steam generator do not exceed the limits established by the manufacturer. Pressure measuring instruments are placed in the system to sense the pressure immediately upstream from the turbine intake valve and the bypass valve as well as the initial steam supply pressure. These pressure signals are transmitted to a computer which produces a control signal in accordance with predetermined conditions.

Skala, K.

1981-06-09T23:59:59.000Z

373

Multiple boiler steam blending control system for an electric power plant  

SciTech Connect

A steam blending control is provided for two or more boilers in an electric power plant. To blend an oncoming boiler with an online boiler, the oncoming boiler is fired to a pressure ramp setpoint and outlet steam is isolated from the plant turbine and directed through position controlled bypass valve means. When steam temperature and pressure conditions are matched, the oncoming boiler isolation valve is opened and the bypass flow then existing is stored in a memory. The oncoming boiler bypass flow is cut back with total oncoming boiler steam flow controlled to the memorized flow valve as a setpoint. Flow from the on-line boiler is cut back under load control as the oncoming boiler flow to the plant turbine is increased. Deblending is implemented in a similar manner.

Binstock, M.H.; Criswell, R.L.

1981-12-22T23:59:59.000Z

374

Method and apparatus for starting supersonic compressors  

DOE Patents (OSTI)

A supersonic gas compressor with bleed gas collectors, and a method of starting the compressor. The compressor includes aerodynamic duct(s) situated for rotary movement in a casing. The aerodynamic duct(s) generate a plurality of oblique shock waves for efficiently compressing a gas at supersonic conditions. A convergent inlet is provided adjacent to a bleed gas collector, and during startup of the compressor, bypass gas is removed from the convergent inlet via the bleed gas collector, to enable supersonic shock stabilization. Once the oblique shocks are stabilized at a selected inlet relative Mach number and pressure ratio, the bleed of bypass gas from the convergent inlet via the bypass gas collectors is effectively eliminated.

Lawlor, Shawn P

2013-08-06T23:59:59.000Z

375

U-130: JBoss Operations Network LDAP Authentication Bug Lets Remote Users  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: JBoss Operations Network LDAP Authentication Bug Lets Remote 0: JBoss Operations Network LDAP Authentication Bug Lets Remote Users Bypass Authentication U-130: JBoss Operations Network LDAP Authentication Bug Lets Remote Users Bypass Authentication March 21, 2012 - 7:00am Addthis PROBLEM: JBoss Operations Network LDAP Authentication Bug Lets Remote Users Bypass Authentication PLATFORM: JBoss Operations Network 2.x ABSTRACT: A vulnerability was reported in JBoss Operations Network. A remote user can login with an arbitrary password in certain cases. reference LINKS: SecurityTracker Alert ID: 1026826 Secunia Advisory SA48471 CVE-2012-1100 IMPACT ASSESSMENT: Medium Discussion: The vulnerability is caused due to an error within the Lightweight Directory Access Protocol (LDAP) authentication when handling invalid bind account credentials, which can be exploited to log-in to LDAP-based

376

U-159: Red Hat Enterprise MRG Messaging Qpid Bug Lets Certain Remote Users  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Red Hat Enterprise MRG Messaging Qpid Bug Lets Certain 9: Red Hat Enterprise MRG Messaging Qpid Bug Lets Certain Remote Users Bypass Authentication U-159: Red Hat Enterprise MRG Messaging Qpid Bug Lets Certain Remote Users Bypass Authentication May 1, 2012 - 7:00am Addthis PROBLEM: Red Hat Enterprise MRG Messaging Qpid Bug Lets Certain Remote Users Bypass Authentication PLATFORM: Red Hat Enterprise MRG v2 for Red Hat Enterprise Linux (version 6) ABSTRACT: A vulnerability was reported in Red Hat Enterprise MRG Messaging. A remote user can access cluster messages and view the internal configuration. reference LINKS: SecurityTracker Alert ID: 1026990 CVE-2011-3620 Red Hat advisory IMPACT ASSESSMENT: High Discussion: Qpid may accept arbitrary passwords and SASL mechanims. A remote user on the local private interconnect network with knowledge of a valid cluster

377

EIS-0490: Final Environmental Impact Statement (Adopted) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0490: Final Environmental Impact Statement (Adopted) EIS-0490: Final Environmental Impact Statement (Adopted) EIS-0490: Final Environmental Impact Statement (Adopted) Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, NV The Federal Highway Administration and the Nevada Department of Transportation prepared an EIS to evaluate the potential environmental impacts of the proposed Boulder City/U.S. 93 Bypass Project in Boulder County, Nevada. DOE's Western Area Power Administration, a cooperating agency, adopted the Final EIS and issued a Record of Decision to modify Western's transmission system and facilities to accommodate the construction of the project. The project website is http://www.nevadadot.com/Micro-Sites/BoulderCityBypass/The_Boulder_City_Bypass.aspx EIS-0490-Adopted-Volume1.pdf

378

CX-006972: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

72: Categorical Exclusion Determination 72: Categorical Exclusion Determination CX-006972: Categorical Exclusion Determination 285-H Cooling Tower Basin Well Water Makeup Supply Bypass CX(s) Applied: B1.5 Date: 09/16/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, National Energy Technology Laboratory Install bypass on makeup well water supply to cooling tower 285-11H per M-MT-H-07595. The location of the work is outdoors in the vicinity of, and adjacent to the 285-H basin and the 285-11H tower. This modification will not change the chemical or physical parameters of the water entering the 285-11H basin, nor will it change the ultimate destination of flush water or basin overflow. The only consequential change will be the chemical characteristics of the 285-H overflow. Due to the new bypass entering the

379

EA-1478: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

478: Finding of No Significant Impact 478: Finding of No Significant Impact EA-1478: Finding of No Significant Impact Hoover Dam Bypass Project Phase II, Nevada Western Area Power Administration proposes to double-circuit a portion of the Hoover Dam Bypass Project PHase II (Double-Circuiting a Portion of the Hoover-Mead No. 5 and No. 7 230-kilovolt (kv) Transmission LInes with the Henderson-Mead No. 1 230-kV Transmission Line. In addition, a fiber optic cable would be placed as an overhead ground wire on the double-circuited transmission lines form the area of Hoover Dam to Mead Substation. Finding of No Significant Impact Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No. 5 and No. 7 230-kilovolt (kv) Transmission LInes with the Henderson-Mead No. 1 230-kV

380

JC3 Bulletin Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 8, 2013 March 8, 2013 V-107: Wireshark Multiple Denial of Service Vulnerabilities Multiple vulnerabilities have been reported in Wireshark, which can be exploited by malicious people to cause a DoS (Denial of Service). March 7, 2013 V-106: Citrix Access Gateway Unspecified Security Bypass Vulnerability A vulnerability has been reported in Citrix Access Gateway, which can be exploited by malicious people to bypass certain security restrictions. March 6, 2013 V-105: Google Chrome Multiple Vulnerabilities Multiple vulnerabilities have been reported in Google Chrome March 5, 2013 V-104: Oracle Java Flaw Lets Remote Users Execute Arbitrary Code A vulnerability was reported in Oracle Java March 4, 2013 V-103: RSA Authentication Agent Lets Remote Users Bypass Authentication

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

V-036: EMC Smarts Network Configuration Manager Database Authentication  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: EMC Smarts Network Configuration Manager Database 6: EMC Smarts Network Configuration Manager Database Authentication Bypass Vulnerability V-036: EMC Smarts Network Configuration Manager Database Authentication Bypass Vulnerability November 29, 2012 - 3:30am Addthis PROBLEM: EMC Smarts Network Configuration Manager Database Authentication Bypass Vulnerability PLATFORM: EMC Smarts Network Configuration Manager (NCM) all versions prior 9.1 ABSTRACT: Two vulnerabilities were reported in EMC Smarts Network Configuration Manager. REFERENCE LINKS: EMC Identifier: ESA-2012-057 Secunia Advisory SA51408 SecurityTracker Alert ID: 1027812 CVE-2012-4614 CVE-2012-4615 IMPACT ASSESSMENT: Medium DISCUSSION: The systems uses a hard-coded key to encrypt authentication credentials on the target system [CVE-2012-4615]. A local user with knowledge of the key

382

JC3 Medium Impact Assessment Bulletins | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 28, 2012 December 28, 2012 V-057: eXtplorer "ext_find_user()" Authentication Bypass Vulnerability A vulnerability has been reported in eXtplorer, which can be exploited by malicious people to bypass certain security restrictions. December 26, 2012 V-055: Firefly Media Server Null Pointer Dereference Lets Remote Users Deny Service A vulnerability was reported in Firefly Media Server December 24, 2012 V-053: Adobe Shockwave player installs Xtras without prompting A vulnerability was reported in Adobe Shockwave. December 21, 2012 V-052: Drupal Core Access Bypass and Arbitrary PHP Code Execution Vulnerabilities Drupal Core Multiple vulnerabilities December 19, 2012 V-050: IBM InfoSphere Information Server Multiple Vulnerabilities Multiple vulnerabilities have been reported in IBM InfoSphere Information

383

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 22650 of 29,416 results. 41 - 22650 of 29,416 results. Page Compliance and Special Report Orders Compliance Orders Special Report Orders http://energy.gov/hss/services/enforcement/compliance-and-special-report-orders Article V-216: Drupal Monster Menus Module Security Bypass and Script Insertion Vulnerabilities The vulnerabilities can be exploited by malicious users to bypass certain security restrictions and conduct script insertion attacks http://energy.gov/cio/articles/v-216-drupal-monster-menus-module-security-bypass-and-script-insertion-vulnerabilities Page Historical Information on the Transportation External Coordination Working Group (TEC) TEC was formed in 1992 to improve coordination between the U.S. Department of Energy (DOE) and external groups interested in the Department's

384

V-026: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: RSA Data Protection Manager Bugs Permit Cross-Site Scripting 6: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions V-026: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions November 16, 2012 - 6:00am Addthis PROBLEM: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions. PLATFORM: RSA Data Protection Manager Appliance versions 2.7.x and 3.x ABSTRACT: Two vulnerabilities were reported in RSA Data Protection Manager. REFERENCE LINKS: SecurityTracker Alert ID: 1027781 EMC Identifier: ESA-2012-055 RSA Worldwide Customer Support CVE-2012-4612 CVE-2012-4613 IMPACT ASSESSMENT: Medium DISCUSSION: Two vulnerabilities were reported in RSA Data Protection Manager. A remote

385

PUMP CONSTRUCTION  

DOE Patents (OSTI)

A pump which utilizes the fluid being pumped through it as its lubricating fluid is described. This is achieved by means of an improved bearing construction in a pump of the enclosed or canned rotor type. At the outlet end of the pump, adjacent to an impeller mechanism, there is a bypass which conveys some of the pumped fluid to a chamber at the inlet end of the pump. After this chamber becomes full, the pumped fluid passes through fixed orifices in the top of the chamber and exerts a thrust on the inlet end of the pump rotor. Lubrication of the rotor shaft is accomplished by passing the pumped fluid through a bypass at the outlet end of the rotor shaft. This bypass conveys Pumped fluid to a cooling means and then to grooves on the surface of the rotor shait, thus lubricating the shaft.

Strickland, G.; Horn, F.L.; White, H.T.

1960-09-27T23:59:59.000Z

386

Experiment DTA report for semiscale transparent vessel countercurrent flow tests  

SciTech Connect

Steady state air-water tests were performed as part of the Semiscale Blowdown and Emergency Core Cooling (ECC) Project to investigate downcomer countercurrent flow and downcomer bypass flow phenomena. These tests were performed in a plexiglass representation of the Semiscale pressure vessel which allowed changes to be madein the geometry of the upper annulus and downcomer for the purpose of investigating the sensitivity of downcomer and bypass flow to changes in system geometry. Tests were also performed to investigate the effects of two-phase inlet flows and different initial system pressures on countercurrent and bypass flow. Results for each test are presented in the form of computer printout of the measurements and of a summary of the pertinent calculated flow rates, pressures, and dimensionless volumetric fluxes. Descriptions of the test facility, instrumentation, operating procedures, and test conditions are also presented. An error analysis is presented for selected volumetric flux calculations. 10 references. (auth)

Hanson, D.J.

1975-10-01T23:59:59.000Z

387

V-200: Apache Struts DefaultActionMapper Redirection and OGNL Security  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Apache Struts DefaultActionMapper Redirection and OGNL 0: Apache Struts DefaultActionMapper Redirection and OGNL Security Bypass Vulnerabilities V-200: Apache Struts DefaultActionMapper Redirection and OGNL Security Bypass Vulnerabilities July 18, 2013 - 6:00am Addthis PROBLEM: Two weaknesses and multiple vulnerabilities have been reported in Apache Struts PLATFORM: Apache Struts 2.x ABSTRACT: The vulnerabilities can be exploited by malicious people to conduct spoofing attacks and bypass certain security restrictions REFERENCE LINKS: Secunia Advisory SA54118 Apache Security Bulletin S2-16 Apache Security Bulletin S2-17 CVE-2013-2248 CVE-2013-2251 IMPACT ASSESSMENT: High DISCUSSION: 1) Input passed via the "redirect:" and "redirectAction:" prefixing parameters is not properly verified in the DefaultActionMapper class

388

U-031: Microsoft Active Directory CRL Validation Flaw Lets Remote Users  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Microsoft Active Directory CRL Validation Flaw Lets Remote 1: Microsoft Active Directory CRL Validation Flaw Lets Remote Users Bypass Authentication U-031: Microsoft Active Directory CRL Validation Flaw Lets Remote Users Bypass Authentication November 9, 2011 - 8:30am Addthis PROBLEM: Microsoft Active Directory CRL Validation Flaw Lets Remote Users Bypass Authentication. PLATFORM: Windows XP Service Pack 3 Windows XP Professional x64 Edition Service Pack 2 Windows Server 2003 Service Pack 2 Windows Server 2003 x64 Edition Service Pack 2 Active Directory Windows Server 2003 with SP2 for Itanium-based Systems Windows Vista Service Pack 2 Windows Vista x64 Edition Service Pack 2 Windows Server 2008 for 32-bit Systems Service Pack 2 Windows Server 2008 for x64-based Systems Service Pack 2 Windows 7 for 32-bit Systems Windows 7 for 32-bit Systems Service Pack 1

389

CX-002198: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2198: Categorical Exclusion Determination 2198: Categorical Exclusion Determination CX-002198: Categorical Exclusion Determination Rock Slough Pole Replacement CX(s) Applied: B1.20, B4.6, B4.13 Date: 03/25/2010 Location(s): Contra Costa Canal, California Office(s): Western Area Power Administration-Sierra Nevada Region The Contra Costa Water District (CCWD) in coordination with Reclamation, Mid-Pacific Region, will be constructing a new fish screen structure as part of an upgrade to the Rock Slough portion of Reclamation's Contra Costa Canal (Canal). The screen will be approximately 320 feet and constructed at the entrance to the Rock Slough. Two of Western Area Power Administration's existing 69 kilovolt poles on the Tracy-Contra Costa transmission line pole will need to be relocated and replaced with new poles to accommodate the

390

CX-005683: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5683: Categorical Exclusion Determination 5683: Categorical Exclusion Determination CX-005683: Categorical Exclusion Determination Advanced Test Reactor Canal AFIP-7 Channel Gap Probe Installation Project CX(s) Applied: B3.6 Date: 04/19/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office This project involves the following primary efforts: ? Installation of the channel gap probe instrument into the East end of the Advanced Test Reactor (ATR) canal o Bolting together two pieces of the assembly o Lifting the channel gap probe into the canal o Termination of cables ? Fabrication and installation of a new skimmer bracket ? the skimmer will be moved to a location on the North side of the parapet from its current location on the far East side of the parapet o Metal machining and welding o Physical

391

EA-1933: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Assessment 3: Final Environmental Assessment EA-1933: Final Environmental Assessment Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA DOE is a cooperating agency with the Department of Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington. EA-1933-FEA-2012.pdf

392

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 1690 of 26,777 results. 81 - 1690 of 26,777 results. Page EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington. http://energy.gov/nepa/ea-1933-yakama-nation-drop-4-hydropower-project-yakama-nation-reservation-wa

393

EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation 933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA SUMMARY DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington.

394

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 2060 of 31,917 results. 51 - 2060 of 31,917 results. Page EA-1933: Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA DOE is a cooperating agency with the Department of the Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington. http://energy.gov/nepa/ea-1933-yakama-nation-drop-4-hydropower-project-yakama-nation-reservation-wa

395

METHOD AND APPARATUS FOR HANDLING RADIOACTIVE PRODUCTS  

DOE Patents (OSTI)

A device is described for handling fuel elements being discharged from a nuclear reactor. The device is adapted to be disposed beneath a reactor within the storage canal for spent fuel elements. The device is comprised essentially of a cylinder pivotally mounted to a base for rotational motion between a vertical position. where the mouth of the cylinder is in the top portion of the container for receiving a fuel element discharged from a reactor into the cylinder, and a horizontal position where the mouth of the cylinder is remote from the top portion of the container and the fuel element is discharged from the cylinder into the storage canal. The device is operated by hydraulic pressure means and is provided with a means to prevent contaminated primary liquid coolant in the reactor system from entering the storage canal with the spent fuel element.

Nicoll, D.

1959-02-24T23:59:59.000Z

396

DOI 10.1007/s10006-011-0278-5  

E-Print Network (OSTI)

Background Bifid mandibular canals (BMC) and trifid mandibular canals (TMC) are variations on the normal anatomy with incidences ranging from 0.08 % to 65.0%. Such aberrations have an important clinical impact. For example, an extra mandibular canal may explain inadequate anesthesia, especially when two mandibular foramina are involved. Furthermore, during mandibular surgery, a second, or even third, neurovascular bundle may be damaged causing paresthesia, neuroma development, or bleeding. Case report Two cases are presented in this article. One patient had a BMC on both sites, and the other patient had a TMC on one site and a BMC on the other site. Discussion Initial screening for the presence of a BMC or TMC can be executed by conventional panoramic radiography. BMCs or TMCs are diagnosed, before executing mandibular surgery; additional CBCT scanning is indicated.

Oral Maxillofac Surg; G. J. Meijer

2011-01-01T23:59:59.000Z

397

Mound Laboratory Plutonium-238 Study Off-Site Analytical Data May-December 1974  

SciTech Connect

Preliminary samples collected from off-site sediment in the Miami-Erie Canal Area near Mound Laboratory indicated that plutonium-238 concentrations are substantially above baseline levels. As a result an extensive sampling and analysis program was performed to determine the plutonium-238 concentrations as a function of depth and location in a drainage ditch, the canal, two ponds, a run-off hollow, a canal overflow creek and the Great Miami River. The plutonium-238 concentration data was used to estimate the total inventory of 238Pu deposited in these waterways, to determine the extent of the contamination, and to evaluate the potential health hazards to the general population of the area. The scope of this report is to present the data collected during this study. Detailed interpretation of the data will be presented in subsequent reports.

Robinson, Bob; Rogers, D. R.; Westendorf, W. H.; Black, H. A.

1975-03-01T23:59:59.000Z

398

Structural and Functional Elucidation of the Mechanism Promoting Error-prone Synthesis by Human DNA Polymerase [kappa] Opposite the 7,8-Dihydro-8-oxo-2'-deoxyguanosine Adduct  

Science Conference Proceedings (OSTI)

Human polymerase kappa (hPol {kappa}) is one of four eukaryotic Y-class DNA polymerases and may be an important element in the cellular response to polycyclic aromatic hydrocarbons such as benzo[a]pyrene, which can lead to reactive oxygenated metabolite-mediated oxidative stress. Here, we present a detailed analysis of the activity and specificity of hPol {kappa} bypass opposite the major oxidative adduct 7,8-dihydro-8-oxo-2{prime}-deoxyguanosine (8-oxoG). Unlike its archaeal homolog Dpo4, hPol {kappa} bypasses this lesion in an error-prone fashion by inserting mainly dATP. Analysis of transient-state kinetics shows diminished 'bursts' for dATP:8-oxoG and dCTP:8-oxoG incorporation, indicative of non-productive complex formation, but dATP:8-oxoG insertion events that do occur are 2-fold more efficient than dCTP:G insertion events. Crystal structures of ternary hPol {kappa} complexes with adducted template-primer DNA reveal non-productive (dGTP and dATP) alignments of incoming nucleotide and 8-oxoG. Structural limitations placed upon the hPol {kappa} by interactions between the N-clasp and finger domains combined with stabilization of the syn-oriented template 8-oxoG through the side chain of Met-135 both appear to contribute to error-prone bypass. Mutating Leu-508 in the little finger domain of hPol {kappa} to lysine modulates the insertion opposite 8-oxoG toward more accurate bypass, similar to previous findings with Dpo4. Our structural and activity data provide insight into important mechanistic aspects of error-prone bypass of 8-oxoG by hPol {kappa} compared with accurate and efficient bypass of the lesion by Dpo4 and polymerase {eta}.

Irimia, Adriana; Eoff, Robert L.; Guengerich, F.Peter; Egli, Martin; (Vanderbilt)

2009-09-25T23:59:59.000Z

399

EA-1478: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

78: Final Environmental Assessment 78: Final Environmental Assessment EA-1478: Final Environmental Assessment Hoover Dam Bypass Project Phase II The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Environmental Assessment Western's Hoover Dam Bypass Project Phase II, DOE/EA-1478 (October 2003) More Documents & Publications EA-1478: Finding of No Significant Impact EIS-0352: Record of Decision EIS-0490: DOE Record of Decision

400

Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking  

Science Conference Proceedings (OSTI)

This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

2001-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Regulation, Competition and Investment in the German Electricity Market: RegTP or REGTP  

E-Print Network (OSTI)

, University of Tilburg (Netherlands), G.Brunekreeft@uvt.nl. 3 University of Hannover (Germany), twelemann@mbox.vwl.uni-hannover.de. 2 on a network access agreement, but network charges are high and the institutional framework clearly violated the level... , 25% from Norway and 7% from the UK and Denmark. (Cf. website of BGW). The home production of gas is concentrated with a share of over 85% in three hands. 11 Although there is restricted by-pass potential by co-generators, by-pass by building direct...

Brunekreeft, Gert; Twelemann, Sven

2006-03-14T23:59:59.000Z

402

INEEL/EXT-97-  

NLE Websites -- All DOE Office Websites (Extended Search)

974 974 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Evaluation Third Quarterly Report April-June 2003 Larry Zirker James Francfort August 2003 Idaho National Engineering and Environmental Laboratory Bechtel BWXT Idaho, LLC INEEL/EXT-03-00974 U.S. Department of Energy FreedomCAR & Vehicle Technologies Oil Bypass Filter Technology Evaluation Third Quarterly Report April-June 2003 Larry Zirker James Francfort August 2003 Idaho National Engineering and Environmental Laboratory Transportation Technology and Infrastructure Department Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Assistant Secretary for Energy Efficiency and Renewable Energy Under DOE Idaho Operations Office

403

High flux reactor  

DOE Patents (OSTI)

A high flux reactor is comprised of a core which is divided into two symetric segments housed in a pressure vessel. The core segments include at least one radial fuel plate. The spacing between the plates functions as a coolant flow channel. The core segments are spaced axially apart such that a coolant mixing plenum is formed between them. A channel is provided such that a portion of the coolant bypasses the first core section and goes directly into the mixing plenum. The outlet coolant from the first core segment is mixed with the bypass coolant resulting in a lower inlet temperature to the lower core segment.

Lake, James A. (Idaho Falls, ID); Heath, Russell L. (Idaho Falls, ID); Liebenthal, John L. (Idaho Falls, ID); DeBoisblanc, Deslonde R. (Summit, NJ); Leyse, Carl F. (Idaho Falls, ID); Parsons, Kent (Idaho Falls, ID); Ryskamp, John M. (Idaho Falls, ID); Wadkins, Robert P. (Idaho Falls, ID); Harker, Yale D. (Idaho Falls, ID); Fillmore, Gary N. (Idaho Falls, ID); Oh, Chang H. (Idaho Falls, ID)

1988-01-01T23:59:59.000Z

404

Multiple volume compressor for hot gas engine  

DOE Patents (OSTI)

A multiple volume compressor for use in a hot gas (Stirling) engine having a plurality of different volume chambers arranged to pump down the engine when decreased power is called for and return the working gas to a storage tank or reservoir. A valve actuated bypass loop is placed over each chamber which can be opened to return gas discharged from the chamber back to the inlet thereto. By selectively actuating the bypass valves, a number of different compressor capacities can be attained without changing compressor speed whereby the capacity of the compressor can be matched to the power available from the engine which is used to drive the compressor.

Stotts, Robert E. (Clifton Park, NY)

1986-01-01T23:59:59.000Z

405

Control apparatus for hot gas engine  

DOE Patents (OSTI)

A mean pressure power control system for a hot gas (Stirling) engine utilizing a plurality of supply tanks for storing a working gas at different pressures. During pump down operations gas is bled from the engine by a compressor having a plurality of independent pumping volumes. In one embodiment of the invention, a bypass control valve system allows one or more of the compressor volumes to be connected to the storage tanks. By selectively sequencing the bypass valves, a capacity range can be developed over the compressor that allows for lower engine idle pressures and more rapid pump down rates.

Stotts, Robert E. (Clifton Park, NY)

1986-01-01T23:59:59.000Z

406

Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin; 1995 Annual Report.  

DOE Green Energy (OSTI)

This is the first year report of a multi-year project that monitors the outmigration and survival of hatchery and naturally produced juvenile salmonids in the lower Umatilla River. This project supplements and complements ongoing or completed fisheries projects in the Umatilla river basin. Knowledge gained on outmigration and survival will assist researchers and managers in adapting hatchery practices, flow enhancement strategies, canal operations, and supplementation and enhancement efforts for natural fish populations. This project also completed tasks related to evaluating juvenile salmonid passage at Three Mile Falls Dam and West Extension Canal.

Knapp, Suzanne M.; Cameron, William A.; Shapleigh, Stacey L. (Oregon Department of Fish and Wildlife, La Grande, OR)

1995-12-01T23:59:59.000Z

407

MATERIALS TESTING REACTOR PROJECT. QUARTERLY REPORT FOR PERIOD ENDING MARCH 1, 1950  

SciTech Connect

Progress is reported in finaiizing basic design data for the Materials Testing Reactor. The major emphasis at ANL was on issurance of design reports on practically all phases of the MTR project outside the reactor face and low the first fioor level. Operation of the mock-up reacr at ORNL at 10 watts resulted in no major design changes. Topics discussed include the reactor building, wing, and reactor service building; canal and canal facilities; water systems; air exhaust systems; electrical power systems; effluent control; and shielding requirements. 11 drawings. (C.H.)

Huffman, J.R.

1958-10-31T23:59:59.000Z

408

Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin; 1996 Annual Report.  

DOE Green Energy (OSTI)

This is the second year report of a multi-year project that monitors the outmigration and survival of hatchery and naturally-produced juvenile salmonids in the lower Umatilla River. This project supplements and complements ongoing or completed fisheries projects in the Umatilla River basin. Knowledge gained on outmigration and survival will assist researchers and managers in adapting hatchery practices, flow enhancement strategies, canal operations, and supplementation and enhancement efforts for natural and restored fish populations. The authors also report on tasks related to evaluating juvenile salmonid passage at Three Mile Falls Dam and West Extension Canal.

Knapp, Suzanne M.; Kern, J. Chris; Carmichael, Richard W. (Oregon Department of Fish and Wildlife, Portland, OR)

1997-01-01T23:59:59.000Z

409

"1. Mystic Generating Station","Gas","Boston Generating LLC",1968  

U.S. Energy Information Administration (EIA) Indexed Site

Massachusetts" Massachusetts" "1. Mystic Generating Station","Gas","Boston Generating LLC",1968 "2. Brayton Point","Coal","Dominion Energy New England, LLC",1545 "3. Canal","Petroleum","Mirant Canal LLC",1119 "4. Northfield Mountain","Pumped Storage","FirstLight Power Resources Services LLC",1080 "5. Salem Harbor","Coal","Dominion Energy New England, LLC",744 "6. Fore River Generating Station","Gas","Boston Generating LLC",688 "7. Pilgrim Nuclear Power Station","Nuclear","Entergy Nuclear Generation Co",685 "8. Bear Swamp","Pumped Storage","Brookfield Power New England",600

410

Power plant and system for accelerating a cross compound turbine in such plant, especially one having an HTGR steam supply  

SciTech Connect

An electric power plant having a cross compound steam turbine and a steam source that includes a high temperature gas-cooled nuclear reactor is described. The steam turbine includes high and intermediate-pressure portions which drive a first generating means, and a low-pressure portion which drives a second generating means. The steam source supplies superheat steam to the high-pressure turbine portion, and an associated bypass permits the superheat steam to flow from the source to the exhaust of the high-pressure portion. The intermediate and low-pressure portions use reheat steam; an associated bypass permits reheat steam to flow from the source to the low-pressure exhaust. An auxiliary turbine driven by steam exhausted from the high-pressure portion and its bypass drives a gas blower to propel the coolant gas through the reactor. While the bypass flow of reheat steam is varied to maintain an elevated pressure of reheat steam upon its discharge from the source, both the first and second generating means and their associated turbines are accelerated initially by admitting steam to the intermediate and low-pressure portions. The electrical speed of the second generating means is equalized with that of the first generating means, whereupon the generating means are connected and acceleration proceeds under control of the flow through the high-pressure portion. 29 claims, 2 figures.

Jaegtnes, K.O.; Braytenbah, A.S.

1977-02-15T23:59:59.000Z

411

This material is declared a work of the U.S. Government and is not subject to copyright protection in the United States. Approved for public release; distribution is unlimited.  

E-Print Network (OSTI)

large quantities of air without any moving parts, which when mixed with fuel can provide the necessary ejector entry. bypass ratio (Eq. 1) ratio of specific heats Superscripts & Subscripts * choked nozzle ejector condition t total INTRODUCTION An ejector, also known as a jet pump, is a pumping device

Williams, John D.

412

Modeling Hydrogen Water Chemistry for BWR Applications  

Science Conference Proceedings (OSTI)

Feedwater hydrogen injection can effectively reduce stress corrosion cracking in BWR recirculation systems. Simulations using a new water radiolysis model indicate that such injections produce different effects in various regions of the BWR primary circuit. For example, higher concentrations of hydrogen are necessary to suppress oxygen and hydrogen peroxide in the core bypass and bottom plenum than in the recirculation system.

1989-06-01T23:59:59.000Z

413

Iterative maximum-likelihood reconstruction in quantum homodyne tomography  

E-Print Network (OSTI)

I propose an iterative expectation maximization algorithm for reconstructing a quantum optical ensemble from a set of balanced homodyne measurements performed on an optical state. The algorithm applies directly to the acquired data, bypassing the intermediate step of calculating marginal distributions. The advantages of the new method are made manifest by comparing it with the traditional inverse Radon transformation technique.

A. I. Lvovsky

2003-11-14T23:59:59.000Z

414

ARGONNE NATIONAL LABORATORY TO: Y. Cho FROM: W. Praeg SUBJECT...  

NLE Websites -- All DOE Office Websites (Extended Search)

(bypass) should be the same as the booster rms current. A general booster current shape is shown in Fig. 1. Its rms value is: I ( lIT 2 ) 1 2 - i dt T o ' 2 2to+t3 t1+t3...

415

A wind turbine blade is ready to be lifted into place at the Windy Point Wind Farm in the Columbia River Gorge. Photo: C. Bruce Forster  

E-Print Network (OSTI)

A wind turbine blade is ready to be lifted into place at the Windy Point Wind Farm in the Columbia with juvenile bypass systems to keep the smolts out of the turbines. But given the gravity of the [salmon 1956 12 MW Chief Joseph Columbia, WA 1958 2,458 MW Cougar McKenzie, OR 1963 25 MW Detroit Santiam

416

NorthwestAuthors Comment on the Council Charged with bringing new order to Columbia River management, the Council has generally drawn praise for its  

E-Print Network (OSTI)

with juvenile bypass sys- tems to keep the smolts out of the turbines. But given the gravity of the [salmon ON THE COUNCIL'S FISH AND WILDLIFE PLANNING 17 BACKGROUND ON THE COUNCIL'S POWER PLANNING 25 CURRENT COUNCIL constructed two other nuclear plants (WNP 1 and 3) in Washington state. The Hanford N-reactor turbine

417

NORTHWEST POWER AND CONSERVATION COUNCIL BRIEFING BOOK  

E-Print Network (OSTI)

with juvenile bypass systems to keep the smolts out of the turbines. But given the gravity of the [salmon .....................................................................................................25 7. Protected Areas and 3) in Washington state. The Hanford N-reactor turbine generator, built by WPPSS, also came on line

418

NORTHWEST POWER PLANNING COUNCIL BRIEFING BOOK  

E-Print Network (OSTI)

, and some dams were retrofitted with juvenile bypass systems to keep the smolts out of the turbines.......................................................................................................................................25 IV. SUPPLEMENT ON CURRENT COUNCIL ISSUES N-reactor turbine generator, built by WPPSS, also came on line just prior to the formal initiation

419

Northwest Power and Conservation Council Briefing Book  

E-Print Network (OSTI)

retrofitted with juvenile bypass systems to keep the smolts out of the turbines. But given the gravity Joseph Columbia, WA 1958 2,458 MW Cougar McKenzie, OR 1963 25 MW Detroit Santiam, OR 1953 100 MW Dexter and 3) in Washington state. The Hanford N-reactor turbine generator, built by WPPSS, also came on line

420

Engine cooling system air venting arrangement with buoyant air purge valve  

Science Conference Proceedings (OSTI)

An air vent arrangement is described for the cooling system of an automotive type engine having a radiator with a coolant inlet. The engine has coolant passages communicating with the radiator through an outlet essentially horizontally disposed, tubing connecting the radiator inlet and coolant outlet, and a thermostat in the outlet horizontally movable to open and closed positions. A horizontally disposed air bleed bypass passage is located vertically above the thermostat connecting the coolant outlet to a portion of the tubing downstream of the thermostat bypassing the same when the thermostat is in a closed position for bleeding air from the cooling system. The bypass passage has a valve therein moveable between a position blocking flow of coolant through the same and a second position opening the passage permitting the bleed of air therethrough. The valve is buoyant and constructed and arranged to pivot from a non flowblocking air bleed position into a flow blocking position in response to flow of coolant into the bypass passage acting thereagainst.

Schnizlein, M.E.

1987-02-17T23:59:59.000Z

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Heat pump system with selective space cooling  

DOE Patents (OSTI)

A reversible heat pump provides multiple heating and cooling modes and includes a compressor, an evaporator and heat exchanger all interconnected and charged with refrigerant fluid. The heat exchanger includes tanks connected in series to the water supply and a condenser feed line with heat transfer sections connected in counterflow relationship. The heat pump has an accumulator and suction line for the refrigerant fluid upstream of the compressor. Sub-cool transfer tubes associated with the accumulator/suction line reclaim a portion of the heat from the heat exchanger. A reversing valve switches between heating/cooling modes. A first bypass is operative to direct the refrigerant fluid around the sub-cool transfer tubes in the space cooling only mode and during which an expansion valve is utilized upstream of the evaporator/indoor coil. A second bypass is provided around the expansion valve. A programmable microprocessor activates the first bypass in the cooling only mode and deactivates the second bypass, and vice-versa in the multiple heating modes for said heat exchanger. In the heating modes, the evaporator may include an auxiliary outdoor coil for direct supplemental heat dissipation into ambient air. In the multiple heating modes, the condensed refrigerant fluid is regulated by a flow control valve. 4 figs.

Pendergrass, J.C.

1997-05-13T23:59:59.000Z

422

Method of sampling certain probability densities without inversion of their distribution functions  

SciTech Connect

A Monte Carlo device is described which bypasses the inversion x = p/sup -1/(r) involved in directly sampling the distribution P(x) of a stochastic variable x with given density p(x). The method is practical for all linear and a broad class of quadratic densities. (auth)

Everett, C.J.; Cashwell, E.D.; Turner, G.D.

1973-09-01T23:59:59.000Z

423

Cycling Operation of Fossil Plants: Volume 1: Cycling Considerations for Niagara Mohawk's Oswego Unit 5  

Science Conference Proceedings (OSTI)

Fossil plants are being converted to cycling operation to accommodate daily load swings and to decrease the overall system fuel costs. This report summarizes the methods and results of an engineering study of three two-shift cycling approaches considered for Niagara Mohawk's Oswego unit 5: superheater/turbine bypass, variable pressure operations, and full-flow condensate polishing.

1991-05-01T23:59:59.000Z

424

On Optimization of Sensor Selection for Aircraft Gas  

E-Print Network (OSTI)

1 On Optimization of Sensor Selection for Aircraft Gas Turbine Engines Ramgopal Mushini Dan Simon temperature 6. HPC exit temperature 7. Bypass duct pressure 8. HPC exit pressure 9. LPT (low pressure turbine. High pressure turbine airflow capacity 6. High pressure turbine efficiency 7. Low pressure turbine

Simon, Dan

425

Simulated and Observed Influence of the Nocturnal Urban Heat Island on the Local Wind Field  

Science Conference Proceedings (OSTI)

A three-dimensional primative equation model was used to simulate the low-level wind field, given the urban heat island as the lower temperature boundary condition. The specification of the average heat island bypassed the need to calculate the ...

Roland R. Draxler

1986-08-01T23:59:59.000Z

426

John Day Tailrace MASS2 Hydraulic Modeling  

DOE Green Energy (OSTI)

Recent biological results for the Juvenile Bypass System at John Jay Lock and Dam have raised concerns about the hydraulic conditions that are created in the tailrace under different project operations. This Memorandum for Record discusses the development and application of a truncated MASS2 model in the John Day tailrace.

Rakowski, Cynthia L.; Richmond, Marshall C.

2003-06-03T23:59:59.000Z

427

Marlin: making it harder to fish for gadgets  

Science Conference Proceedings (OSTI)

Code-reuse attacks, including return-oriented programming (ROP) and jump-oriented programming, bypass defenses against code injection by repurposing existing executable code in application binaries and shared libraries toward a malicious end. A common ... Keywords: malware, return-oriented programming, security

Aditi Gupta; Sam Kerr; Michael S. Kirkpatrick; Elisa Bertino

2012-10-01T23:59:59.000Z

428

Speed control of DC motor based on neural net and fuzzy logic  

Science Conference Proceedings (OSTI)

This paper presented the speed control of DC motor based on neural net and fuzzy logic. To bypass the difficulties caused by system constraints and modelling uncertainties of the speed control of DC motor a neural network approach for on-line speed control ... Keywords: DC motor, fuzzy logic, neural network, speed control

Zahra Moravej

2005-09-01T23:59:59.000Z

429

Zinc-chlorine battery plant system and method  

DOE Patents (OSTI)

A zinc-chlorine battery plant system and method of redirecting the electrical current around a failed battery module. The battery plant includes a power conditioning unit, a plurality of battery modules connected electrically in series to form battery strings, a plurality of battery strings electrically connected in parallel to the power conditioning unit, and a bypass switch for each battery module in the battery plant. The bypass switch includes a normally open main contact across the power terminals of the battery module, and a set of normally closed auxiliary contacts for controlling the supply of reactants electrochemically transformed in the cells of the battery module. Upon the determination of a failure condition, the bypass switch for the failed battery module is energized to close the main contact and open the auxiliary contacts. Within a short time, the electrical current through the battery module will substantially decrease due to the cutoff of the supply of reactants, and the electrical current flow through the battery string will be redirected through the main contact of the bypass switch.

Whittlesey, Curtis C. (Birmingham, MI); Mashikian, Matthew S. (Huntington Woods, MI)

1981-01-01T23:59:59.000Z

430

PTG exam 2322011 short answers 75. For this cyclic process: 0dUQW  

E-Print Network (OSTI)

pump power needed = p � volume flow = 54 MW with pump efficiency 70 % this gives 54 / 0.7 = 77 MW the total oil stream to T = 150°C ­ Q/(100,0�2,00) = 90°C b. The oil stream not bypassed is cooled

Zevenhoven, Ron

431

Fighting unicode-obfuscated spam  

Science Conference Proceedings (OSTI)

In the last few years, obfuscation has been used more and more by spammers to make spam emails bypass filters. The standard method is to use images that look like text, since typical spam filters are unable to parse such messages; this is what is used ... Keywords: SpamAssassin, deobfuscated emails, obfuscated emails, spam emails, unicode characters

Changwei Liu; Sid Stamm

2007-10-01T23:59:59.000Z

432

NOx Adsorbers for Heavy Duty Truck Engines-Testing and Simulation  

DOE Green Energy (OSTI)

This feasibility study of NOx adsorbers in heavy-duty diesel engines examined three configurations (dual-leg, single-leg and single-leg-bypass) in an integrated experimental setup, composed of a Detroit Diesel Class-8 truck engine, a catalyzed diesel particulate filter and the NOx absorber system. The setup also employed a reductant injection concept, sensors and advanced control strategies.

Hakim, N; Hoelzer, J.; Liu, Y.

2002-08-25T23:59:59.000Z

433

107TH CONGRESS 1ST SESSION  

E-Print Network (OSTI)

of benefits and feasibility of oil bypass filtration technology. Sec. 164. Gas flare study. Sec. 165. Subtitle B--Oil and Gas Sec. 2421. Petroleum-oil technology. Sec. 2422. Gas. Subtitle C--Ultra-Deepwater and Unconventional Drilling Sec. 2441. Short title. Sec. 2442. Definitions. Sec. 2443. Ultra-deepwater program. Sec

434

SURVEY, ECOLOGY, AND SYSTEMATICS OF THE UPPER POTOMAC ESTUARY BIOTA: AUFWUCHS MICROFAUNA PHASE III  

E-Print Network (OSTI)

plant on the experimental side causing decreased zooplankters and increased algal growth. #12 Sewage Treatment Plant, while the control received dechlorinated tap water. Temperature, D.O., p, with sewage added to both sides, we used a heat shock of 10 C in a bypass simulating the conventional power

District of Columbia, University of the

435

Available online at www.sciencedirect.com Energy Procedia 00 (2013) 000000  

E-Print Network (OSTI)

.elsevier.com/locate/procedia GHGT-11 Cycling coal and natural gas-fired power plants with CCS Peter Versteega* , David Luke Oatesa storage are modeled for new coal and natural gas-fired power plants with amine and ammonia-based post electricity price signals, including solvent storage and flue gas bypass. Power plants with these options may

436

Stent Graft in Managing Juxta-Renal Aortoiliac Occlusion  

SciTech Connect

Endovascular procedures are frequently used as an alternative to surgical bypass in aortic and iliac occlusion. Stents have revolutionized the scope of such endovascular procedures, but there are few reports of stents or stent grafts in occlusive juxta-renal aortic occlusion. We present a case where such occlusion was managed by use of a stent graft with successful outcome.

Prabhudesai, V., E-mail: v_prabhudesai@hotmail.com; Mitra, K.; West, D. J. [NorthStaffordshire Hospital NHS Trust, Newcastle-under-Lyme, ST4 6QG, Department of Radiology (United Kingdom); Dean, M. R. E. [Royal ShrewsburyHospital, Mytton Oak Road, Shrewsbury, SY3 8XQ (United Kingdom)

2003-09-15T23:59:59.000Z

437

Influence of parasitic resistances on the mismatch relative power loss of solar cell modules  

E-Print Network (OSTI)

available from a photovoltaic module is reduced by the cell-to-cell variations in the photogenerated current of the integrated bypass diode in the unit cell structure. Previous studies on the performance of photovoltaic solar. [ 11 ] have pro- posed a sorting method of the photovoltaic cells and modules in a array into four bins

Paris-Sud XI, Université de

438

Heat pump system with selective space cooling  

DOE Patents (OSTI)

A reversible heat pump provides multiple heating and cooling modes and includes a compressor, an evaporator and heat exchanger all interconnected and charged with refrigerant fluid. The heat exchanger includes tanks connected in series to the water supply and a condenser feed line with heat transfer sections connected in counterflow relationship. The heat pump has an accumulator and suction line for the refrigerant fluid upstream of the compressor. Sub-cool transfer tubes associated with the accumulator/suction line reclaim a portion of the heat from the heat exchanger. A reversing valve switches between heating/cooling modes. A first bypass is operative to direct the refrigerant fluid around the sub-cool transfer tubes in the space cooling only mode and during which an expansion valve is utilized upstream of the evaporator/indoor coil. A second bypass is provided around the expansion valve. A programmable microprocessor activates the first bypass in the cooling only mode and deactivates the second bypass, and vice-versa in the multiple heating modes for said heat exchanger. In the heating modes, the evaporator may include an auxiliary outdoor coil for direct supplemental heat dissipation into ambient air. In the multiple heating modes, the condensed refrigerant fluid is regulated by a flow control valve.

Pendergrass, Joseph C. (Gainesville, GA)

1997-01-01T23:59:59.000Z

439

Investigation of in-situ low-temperature oxidation as a viable sand consolidation technique  

E-Print Network (OSTI)

of the most serious problems encountered in the petro- leum industry. Without proper measures to control a temperature- controlled oven. Valves and by-pass systems were provided to interchange the flow through into the core holders inside the oven. The confining pressure was then applied and maintained at a constant

Abu-Khamsin, Sidqi

440

Analytical and Experimental Studies on the Hybrid Fault Current Limiter Employing Asymmetric Non-Inductive Coil and Fast Switch  

E-Print Network (OSTI)

This paper deals with design and operating test of a novel hybrid FCL. The FCL system consists of a coil, a fast switch and a resistor for bypassing the fault current. The switch is driven by novel non-inductive coil ...

Yang, Seong Eun

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CPI anticipates price benefits in an open electricity market - but utilities `will erect roadblocks`  

SciTech Connect

Chemical manufacturers and industrial gas firms welcome the coming deregulation of electricity because the change offers them competitive choice in power supplies. They anticipate price benefits like those that have flowed from natural gas deregulation, which feed from manufacturers to bypass local utilities and shop for their own fuel supplies.

Pospisil, R.

1994-11-23T23:59:59.000Z

442

Design of regulated velocity flow assurance device for petroleum industry  

E-Print Network (OSTI)

The petroleum industry faces problems in transportation of crude petroleum be- cause of the deposition of paraffins, hydrates and asphaltenes on the insides of the pipeline. These are conventionally removed using either chemical inhibitors or mechani- cal devices, called pigs, which travel through the pipeline and mechanically scrape away the deposits. These pigs are propelled by the pipeline product itself and hence travel at the same velocity as the product. Research has indicated that cleaning would be better if the pigs are traveling at a relatively constant velocity of around 70% of the product velocity. This research utilizes the concept of regulating the bypass flow velocity in order to maintain the pig velocity. The bypass flow is regulated by the control unit based on the feedback from the turbine flowmeter, which monitors the bypass flow. A motorized butterfly valve is used for actually controlling the bypass flow. In addition to cleaning, the proposed pig utilizes on-board electronics like accelerom- eter and pressure transducers to store the data gathered during the pig run. This data can then be analyzed and the condition of the pipeline predicted. Thus, this research addresses the problem of designing a pig to maintain a constant velocity in order to achieve better cleaning. It also helps gather elementary data that can be used to predict the internal conditions in the pipe.

Yardi, Chaitanya Narendra

2004-12-01T23:59:59.000Z

443

Aquatic Supplement Hood River Subbasin  

E-Print Network (OSTI)

crystal springs 4 Crystal Sp WD bypass reach to overflow? ? 4 dog river 3 City of TD none 3 no infoAppendix B Aquatic Supplement Contents Hood River Subbasin Tables and Figures: Table 1. Current estimated peak summer withdrawals from the Hood River Table 2. Historic lake stocking and fish introductions

444

Crosswell Seismic Amplitude-Versus-Offset for Detailed Imaging of Facies and Fluid Distribution within Carbonate Oil Reservoirs  

E-Print Network (OSTI)

within Carbonate Oil Reservoirs DOE Award Number: DE-FC26-04NT15508 Oct 2004 - Sep 2007 Michigan Technological University, Houghton, MI 49931 A large amount of oil, perhaps billions of barrels, remains trapped, and demonstrate a method of using crosswell seismic profiling for identification of trapped oil, bypassed

445

Implementation av Patientsimulator fr Anestesimaskiner  

E-Print Network (OSTI)

carbon dioxide from a gas tank through a mass flow controller. The carbon dioxide in the system can a fraction of the gas from the container through a bypass circuit with an active charcoal filter that adsorbs it with calculated values. The exhaled simulator imitates human lungs to a large extent. The simulation of uptake

Johansson, Karl Henrik

446

Point and Click Guide to Microsoft Office for Windows 95, 2nd edition  

Science Conference Proceedings (OSTI)

From the Publisher:This book takes the fast and fun approach to learning Microsoft Office applications. It provides the key to the wealth of toolbar icons, buttons, and on-screen toggles that let you bypass menu commands and dialog boxes to get instant ...

Peter G. Aitken

1995-10-01T23:59:59.000Z

447

RDMA Capable iWARP over Datagrams Ryan E. Grant, Mohammad J. Rashti, Ahmad Afsahi  

E-Print Network (OSTI)

RDMA Capable iWARP over Datagrams Ryan E. Grant, Mohammad J. Rashti, Ahmad Afsahi Electrical on streaming applications, showing a 24% improvement in memory usage and up to a 74% improvement in performance for significantly lower latencies and reduced CPU utilization by offering kernel bypass, zero-copy based

Balaji, Pavan

448

Transmitting and gathering streaming data in wireless multimedia sensor networks within expected network lifetime  

Science Conference Proceedings (OSTI)

Using multimedia sensor nodes in wireless sensor networks (WSNs) can significantly enhance the capability of WSNs for event description. Different kinds of holes can easily appear in WSNs. How to efficiently transmit multi-media streaming data and bypass ... Keywords: cross layer design, geographical multipath routing, wireless multimedia sensor networks

Lei Shu; Yan Zhang; Zhangbing Zhou; Manfred Hauswirth; Zhiwen Yu; Gearoid Hynes

2008-08-01T23:59:59.000Z

449

On the Feasibility of a Moving Support for Surgery on the Beating Heart  

E-Print Network (OSTI)

On the Feasibility of a Moving Support for Surgery on the Beating Heart A.L. Trejos1, S Burrard Vancouver BC, V6Z 1Y6 Abstract. In this paper the use of a heart-tracking hand support is pro- posed to allow coronary artery bypass grafting surgery to take place on the beating heart. This method

Salcudean, Tim

450

Visualization of Power Systems Final Project Report  

E-Print Network (OSTI)

STRM P L SUCSPH L SUCS SHORE RD SHORE RD NEWBRGE BRRT PH RULND RD PILGRIM NRTHPRT1 ELWOOD 1 NRTHPRT2 BRIDGWTR WWALP345 NEA 336 NEA PILGRIM CANAL JORDN RD CARP HL BELCH301 ALPS345 MANY393 DETROIT MAXCYS AUG E NEWBRGE BRRT PH RULND RD PILGRIM NRTHPRT1 ELWOOD 1 NRTHPRT2 SYOSSET GRENLAWN LCST GRV HOLTS GT HOL BRAN

451

Proceedings of the twelfth conference on explosives and blasting techniques  

SciTech Connect

This book presents the papers given at a conference on the use of explosive fracturing to construct underground energy facilities. Topics considered at the conference included the Atomic Energy of Canada Limited's underground research laboratory, drilling and blasting techniques for canals, pipeline trenches, blasting costs, underground coal mining, presplitting of granite, energy consumption, and overburden blasting vibrations.

Konya, C.J.

1986-01-01T23:59:59.000Z

452

Social impacts of hazardous and nuclear facilities and events: Implications for Nevada and the Yucca Mountain high-level nuclear waste repository; [Final report  

SciTech Connect

Social impacts of a nuclear waste repository are described. Various case studies are cited such as Rocky Flats Plant, the Feed Materials Production Center, and Love Canal. The social impacts of toxic contamination, mitigating environmental stigma and loss of trust are also discussed.

Freudenburg, W.R. [Wisconsin Univ., Madison, WI (United States)] Wisconsin Univ., Madison, WI (United States); Carter, L.F.; Willard, W. [Washington State Univ., Pullman, WA (United States)] Washington State Univ., Pullman, WA (United States); Lodwick, D.G. [Miami Univ., Oxford, OH (United States)] Miami Univ., Oxford, OH (United States); Hardert, R.A. [Arizona State Univ., Tempe, AZ (United States)] Arizona State Univ., Tempe, AZ (United States); Levine, A.G. [State Univ. of New York, Buffalo, NY (United States). Dept. of Sociology] State Univ. of New York, Buffalo, NY (United States). Dept. of Sociology; Kroll-Smith, S. [New Orleans Univ., LA (United States)] New Orleans Univ., LA (United States); Couch, S.R. [Pennsylvania State Univ., University Park, PA (United States)] Pennsylvania State Univ., University Park, PA (United States); Edelstein, M.R. [Ramapo College, Mahwah, NJ (United States)] Ramapo College, Mahwah, NJ (United States)

1992-05-01T23:59:59.000Z

453

Destructive Winds Caused by an Orographically Induced Mesoscale Cyclone  

Science Conference Proceedings (OSTI)

Sustained winds in excess of 70 kt and gusts of close to 100 kt were measured at the Hood Canal Bridge in western Washington on the morning of 13 February 1979 shortly before the bridge collapsed. An extraordinary blowdown of timber also occurred ...

Richard J. Reed

1980-11-01T23:59:59.000Z

454

The Role of Photography in the Transformation and Preservation of Venice  

E-Print Network (OSTI)

together, while many streets were widened and canals filled.36 Changes to Venice's architecture from 1819 to 1840, capturing the sublimity of the Venetian light. Charles Dickens visited Venice as possible a document for future art-historical research." (34) 34 Longworth, Philip. The Rise and Fall

Hammock, Bruce D.

455

*Two Cities, Three Rivers, Countless Views * 1 3 D a y s o f D a z z l i n g C i t i e s a n D  

E-Print Network (OSTI)

-growing town of Rüdesheim, Bavarian Miltenberg, and medieval Bamberg, among others. The program culminates; as well as sightseeing in Paris, Trier, Miltenberg, Wurzburg, Bamberg, and Prague. 1 3 D a y s o f D a z z Moselle River Miltenberg Rhine River Rhine Gorge Main Danube Canal A Day-by-Day Guide:* Day 1­2: En Route

Aalberts, Daniel P.

456

UNIVERSITT REGENSBURG 9. Forschungsbericht  

E-Print Network (OSTI)

Bratislava Main Danube Canal Rhine Gorge Main River Danube River Rhine River Cologne Miltenberg GERMANY a SPECIAL TREAT, then there's free time to explore the Drosselgasse. (B,L,D) Day 6 Miltenberg. Located on the Main River, Miltenberg is a picturesque Bavarian village that thrived on income from river traffic. Its

Schubart, Christoph

457

JOURNAL OF VIROLOGY, Mar. 2003, p. 34513459 Vol. 77, No. 6 0022-538X/03/$08.00 0 DOI: 10.1128/JVI.77.6.34513459.2003  

E-Print Network (OSTI)

Bratislava Main Danube Canal Rhine Gorge Main River Danube River Rhine River Cologne Miltenberg GERMANY a SPECIAL TREAT, then there's free time to explore the Drosselgasse. (B,L,D) Day 6 Miltenberg. Located on the Main River, Miltenberg is a picturesque Bavarian village that thrived on income from river traffic. Its

458

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

. ..................................................................................................... 129 Graph 25: Average input power [kW W.D. Larry Carter Exeter I.D. & Ivanhoe I.D. Dale Sally Firebaugh Canal W.D. Jeff Bryant Fresno I Golden State Irrigation Services Stockton Wayne Ketcherside Carter Pump Wasco David L. Bradley Valley

459

PR  

E-Print Network (OSTI)

Open channel flow of water has been used in aquaculture production for many years. Distribution canals, raceways and drainage ditches are some examples. Since the beginning of civilization man has been interested in flow in open channels. Attempts to record the levels on the Nile River date

J. David Bankston; Fred Eugene Baker; Sextus Julius; Frontinus Water

1995-01-01T23:59:59.000Z

460

State and Regional Hydrogen and Fuel Cell Initiative Sacramento Conference Center, Sacramento, CA  

E-Print Network (OSTI)

to a level where such equipment provides a hedge against future electricity rate increases. Funding caps: $4 (developmental). Erie Canal to stem cells. States: historical locus for technology innovation. Clean energy resurgence consistent with American historical trends. 3 #12;NYSERDA--Subsidy Model RPS behind-the-meter fuel

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Auditory system comparisons between sand cats and other felid species : acoustic input admittance of ears and auditory brainstem responses  

E-Print Network (OSTI)

The sand cat, one species of the cat family, is found only in deserts and has unusually large ear canals and middle-ear air cavities. Recent work has shown that sand cat ears absorb acoustic power at low frequencies (<1 ...

Chan, Howard F

2005-01-01T23:59:59.000Z

462

Optimal filling factor of nanorod lenses for subwavelength imaging  

SciTech Connect

We analyze the effect of the filling factor on the imaging performance of metallic nanorod lenses. We observe that thicker nanorods allow lower reflection in the canalization regime and we find optimal values of the filling factor to achieve a transfer function with the characteristics of a perfect lens in a wide range of spatial frequencies.

Kosulnikov, Sergey Yu.; Yankovskaya, Elizaveta A. [Department of Photonics and Optoinformatics, St. Petersburg National Research University of Information Technologies, Mechanics and Optics, Kronverkskiy pr., 49, 197101 St. Petersburg (Russian Federation); Maslovski, Stanislav I. [Department of Electrical Engineering, Instituto de Telecomunicacoes, Universidade de Coimbra, Polo II, 3030-290 Coimbra (Portugal); Belov, Pavel A. [Department of Photonics and Optoinformatics, St. Petersburg National Research University of Information Technologies, Mechanics and Optics, Kronverkskiy pr., 49, 197101 St. Petersburg (Russian Federation); Queen Mary College, University of London, Mile End Road, London E1 4NS (United Kingdom); Kivshar, Yuri S. [Department of Photonics and Optoinformatics, St. Petersburg National Research University of Information Technologies, Mechanics and Optics, Kronverkskiy pr., 49, 197101 St. Petersburg (Russian Federation); School of Electronic Engineering and Computer Science, Nonlinear Physics Centre, Australian National University, Canberra, Australian Capital Territory 0200 (Australia)

2011-12-15T23:59:59.000Z

463

ARTICLE doi:10.1038/nature09708 Mapping copy number variation by  

E-Print Network (OSTI)

be moving the oil from Alberta to British Columbia and then shipping it by tankers via the Panama Canal another bold decision by refusing to consider the fate of the Keystone XL pipeline until after the 2012 of the White House--with the placards about the Earth in peril and with pipeline-like black plastic tubes

Batzer, Mark A.

464

MANAGING IMPACTS OF MAJOR PROJECTS: AN ANALYSIS OF THE ENBRIDGE  

E-Print Network (OSTI)

be moving the oil from Alberta to British Columbia and then shipping it by tankers via the Panama Canal another bold decision by refusing to consider the fate of the Keystone XL pipeline until after the 2012 of the White House--with the placards about the Earth in peril and with pipeline-like black plastic tubes

465

0270~6474/83/0305-0942$02.00/0 Copyright 0 Society for Neuroscience  

E-Print Network (OSTI)

that this corresponds to the diffusion potential across tight junc- tions selective for K+; it varies, when other alkali, 1967a; Sand et al., 1975; Kroese et al., 1980). It is not found, however, in semicircular canals of the chamber in vitro. Apical surfaces are ringed with tight junctions (unpublished observations), which

Corey, David P.

466

China, March 2005 DAY 1: FLYING TO MUNICH & SHANGHAI  

E-Print Network (OSTI)

south again, and Shanghai appears on the horizon, with its big towers, canals, dirty suburbs... 13... The water is always warm, it's impossible to get it cooled. And the taste is only bearable, not exactly good and watched the Pearl tower, the Pudong area and the passing boats from the west side of the river, called

California at Santa Cruz, University of

467

Brief A decomposition approach for the solution of the unit loading problem in hydroplants  

Science Conference Proceedings (OSTI)

This paper presents a decomposition approach for the solution of the dynamic programming formulation of the unit loading problem in hydroplant management. This decomposition approach allows the consideration of network and canal constraints without additional ... Keywords: Decomposition, Dynamic programming, Hydroelectricity, Unit loading problem

MichèLe Breton; Saeb Hachem; Abdelghani Hammadia

2002-03-01T23:59:59.000Z

468

USDA SALINITY CONTROL ENVI RONMENTAL ASSESSMENT .  

E-Print Network (OSTI)

quality samples. Their assistance in interpreting laboratory test results and reviewing results/ Alternative 2 - Improve canal. pipeline and lateral system onfarm irrigation systems and install erosion Physiography and Geology The Moapa Valley Subevaluation Unit ;s in the Basin and Range Province and elevations

469

Segmentation of nerve bundles and ganglia in spine MRI using particle filters  

Science Conference Proceedings (OSTI)

Automatic segmentation of spinal nerve bundles that originate within the dural sac and exit the spinal canal is important for diagnosis and surgical planning. The variability in intensity, contrast, shape and direction of nerves seen in high resolution ... Keywords: nerve bundles, particle filter, segmentation, tracking

Adrian Dalca; Giovanna Danagoulian; Ron Kikinis; Ehud Schmidt; Polina Golland

2011-09-01T23:59:59.000Z

470

Battling Coastal Erosion Holding back the sea with sand, mats, piling, and concrete  

E-Print Network (OSTI)

as we did not want any oil leakage at the beach, and from a cost perspective, the old method Service (USFWS) has teamed up with the Louisiana Department of Natural Resources (LDNR) to test four as much cargo as the Panama Canal. "A portion of the GIWW goes through Louisiana, and it cuts through our

471

Manifold free multiple sheet superplastic forming  

DOE Patents (OSTI)

Fluid-forming compositions in a container attached to enclosed adjacent sheets are heated to relatively high temperatures to generate fluids (gases) that effect inflation of the sheets. Fluid rates to the enclosed space between the sheets can be regulated by the canal from the container. Inflated articles can be produced by a continuous, rather than batch-type, process.

Elmer, John W. (Danville, CA); Bridges, Robert L. (Knoxville, TN)

2001-01-01T23:59:59.000Z

472

Dark algae, life on Mars?  

NLE Websites -- All DOE Office Websites (Extended Search)

Dark algae, life on Mars? Dark algae, life on Mars? Name: Jungle Fever Location: N/A Country: N/A Date: N/A Question: I'm probably writing this is vain since my numerous other notes weren't answered, but here goes. Does anyone out there know anything about the dark algae found in Siberia (or Antarctica, I don't remember which) or the primitive microbes found by Chris McKay that were revived by a drop of water? Also, can this concept be applied to the possibility of life on Mars? I'd also appreciate any information on extraterrestrial microorganisms or life forms. Much thanks. Replies: I don't know specifically about the algae that you mention. However, I do know that there are several kinds of algae that go into a sexual reproductive state in response to adverse conditions often including high temperatures or lack of moisture. This sexual phase results in formation of a fertilized zygote which becomes dormant until conditions are optimum for growth. This usually involves water - so a drop of water could initiate growth of the new alga, and it could reproduce asexually quite rapidly, until conditions trigger the sexual phase again. I see no reason why such a growth pattern couldn't apply to life on Mars or anywhere else. There isn't much information, as far as I'm aware, regarding extraterrestrial life. So far, none has been found, but it is likely, statistically, that there is some out there, somewhere. The SETI program (Search for extraterrestrial intelligence), funded in part by the Planetary Society, is trying to find higher forms of life by doing radio searches.

473

JC3 Bulletin Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 22, 2013 February 22, 2013 V-097: Google Chrome Multiple Vulnerabilities Multiple vulnerabilities have been reported in Google Chrome, where some have an unknown impact and others can be exploited by malicious people to bypass certain security restrictions and compromise a user's system. February 21, 2013 V-096: Mozilla Thunderbird / SeaMonkey Multiple Vulnerabilities A weakness and multiple vulnerabilities have been reported in Mozilla Thunderbird and SeaMonkey, which can be exploited by malicious people to disclose potentially sensitive information, conduct spoofing attacks, bypass certain security restrictions, and compromise a user's system. February 20, 2013 V-095: Oracle Java Flaws Let Remote Users Execute Arbitrary Code Several vulnerabilities were reported in Oracle Java.

474

JC3 Bulletin Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2011 31, 2011 T-707: Apache Tomcat AJP Protocol Processing Bug Lets Remote Users Bypass Authentication or Obtain Information Apache Tomcat AJP protocol processing bug lets remote users bypass authentication or obtain information. August 30, 2011 T-706: Microsoft Fraudulent Digital Certificate Issued by DigiNotar Fraudulent Digital Certificate Issued by DigiNotar, a Certification Authority Present in the Trusted Root Certification Authorities August 30, 2011 T-705: Linux Kernel Weakness in Sequence Number Generation Facilitates Packet Injection Attacks Linux Kernel Weakness in Sequence Number Generation Facilitates Packet Injection Attacks. August 29, 2011 T-704: RSA enVision Lets Remote Users View Files and Remote Authenticated Users Obtain Password RSA enVision lets remote users view files and remote authenticated users

475

JC3 Bulletin Archive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2011 26, 2011 T-676: Apple iOS Certificate Chain Validation Flaw Lets Certain Remote Users Access or Modify SSL/TLS Sessions Apple iOS Certificate Chain Validation Flaw Lets Certain Remote Users Access or Modify SSL/TLS Sessions. July 25, 2011 T-675: Apple Laptop Battery Interface Lets Local Users Deny Service Apple Laptop Battery Interface Lets Local Users Deny Service July 22, 2011 T-674: Drupal Secure Password Hashes Module Security Bypass Vulnerability The Secure Password Hashes module for Drupal is prone to a security-bypass vulnerability. July 21, 2011 T-673: Apple Safari Multiple Flaws Let Remote Users Execute Arbitrary Code, Conduct Cross-Site Scripting Attacks Apple Safari Multiple Flaws Let Remote Users Execute Arbitrary Code, Conduct Cross-Site Scripting Attacks

476

V-143: Fresh Java issues being exploited in the wild | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Fresh Java issues being exploited in the wild 3: Fresh Java issues being exploited in the wild V-143: Fresh Java issues being exploited in the wild April 26, 2013 - 6:00am Addthis PROBLEM: A new Metasploit module for the Java 7u17 sandbox bypass emerged PLATFORM: All versions of Java SE-7 (including the recently released 1.7.0_21-b11) ABSTRACT: Java issues are being exploited in the wild by exploit kits, with Cool and Redkit specifically being known to use these bugs, and others likely to follow shortly. REFERENCE LINKS: SecList SE-2012-01 Security Explorations IMPACT ASSESSMENT: Medium DISCUSSION: It can be used to achieve a complete Java security sandbox bypass on a target system. IMPACT: Manipulation of data System access SOLUTION: Vendor recommends patch systems immediately Addthis Related Articles V-142: Oracle Java Reflection API Flaw Lets Remote Users Execute Arbitrary

477

JC3 High Impact Assessment Bulletins | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 9, 2011 September 9, 2011 T-713: Blue Coat Reporter Directory Traversal Flaw Blue Coat Reporter Directory Traversal Flaw Lets Remote Users Gain Full Control. September 7, 2011 T-711: Fraudulent Google Digital Certificates Could Allow Man-in-the-Middle Attacks Fraudulent Google Digital Certificates Could Allow Man-in-the-Middle Attacks. September 6, 2011 T-710: Apache HTTP Server Overlapping Ranges Denial of Service Vulnerability Apache HTTP Server Overlapping Ranges Denial of Service Vulnerability. September 2, 2011 T-709:Mac OS X Keychain Certificate Settings Can Be Bypassed By Remote Users Mac OS X keychain certificate settings can be bypassed by remote users September 1, 2011 T-708:Pidgin Bugs Let Remote Users Deny Service and Potentially Execute Arbitrary Code Pidgin bugs let remote users deny service and potentially execute arbitrary

478

T-611: Cisco IOS OCSP Revoked Certificate Security Issue | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Cisco IOS OCSP Revoked Certificate Security Issue 1: Cisco IOS OCSP Revoked Certificate Security Issue T-611: Cisco IOS OCSP Revoked Certificate Security Issue April 27, 2011 - 2:07am Addthis PROBLEM: A security issue has been reported in Cisco IOS, which can be exploited by malicious people to bypass certain security restrictions. The security issue is caused due to an error in the OCSP functionality and can lead to a revoked certificate being successfully authenticated. PLATFORM: Cisco IOS 15.0, 15.1 Operating System ABSTRACT: The PKI functionality in Cisco IOS 15.0 and 15.1 does not prevent permanent caching of certain public keys, which allows remote attackers to bypass authentication and have unspecified other impact by leveraging an IKE peer relationship in which a key was previously valid but later revoked, aka Bug

479

JC3 Medium Impact Assessment Bulletins | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 12, 2013 August 12, 2013 V-216: Drupal Monster Menus Module Security Bypass and Script Insertion Vulnerabilities The vulnerabilities can be exploited by malicious users to bypass certain security restrictions and conduct script insertion attacks August 7, 2013 V-213: PuTTY SSH Handshake Integer Overflow Vulnerabilities The vulnerabilities can be exploited by malicious people to potentially compromise a user's system. August 6, 2013 V-212: Samba smbd CPU Processing Loop Lets Remote Users Deny Service A vulnerability was reported in Samba August 3, 2013 V-210: HP LaserJet Pro Printer Bug Lets Remote Users Access Data A potential security vulnerability has been identified with certain HP LaserJet Pro printers. The vulnerability could be exploited remotely to gain unauthorized access to data.

480

T-574: Google Chrome Multiple Flaws Let Remote Users Execute Arbitrary Code  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74: Google Chrome Multiple Flaws Let Remote Users Execute 74: Google Chrome Multiple Flaws Let Remote Users Execute Arbitrary Code T-574: Google Chrome Multiple Flaws Let Remote Users Execute Arbitrary Code March 10, 2011 - 3:05pm Addthis PROBLEM: Multiple vulnerabilities were reported in Google Chrome. A remote user can cause arbitrary code to be executed on the target user's system. A remote user can bypass the pop-up blocker. PLATFORM: Google Chrome prior to 10.0.648.127 ABSTRACT: Multiple vulnerabilities have been reported in Google Chrome, where some have an unknown impact while others can be exploited by malicious people bypass certain security restrictions, disclose system information, and compromise a user's system. reference LINKS: Secunia Advisory: SA43683 Google Chrome Support Chrome Stable Release SecurityTracker Alert ID:1025181

Note: This page contains sample records for the topic "mckay bypass canal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Steam turbine control  

SciTech Connect

In a power plant which includes a steam turbine with main control valves for admitting steam into the steam turbine and a steam bypass with bypass control valves for diverting steam around the steam turbine directly into a condenser, it is necessary to coordinate the operation of the respective valves so that the steam turbine can be started, brought up to speed, synchronized with a generator and then loaded as smoothly and efficiently as possible. The present invention provides for such operation and, in addition, allows for the transfer of power plant operation from the so-called turbine following mode to the boiler following mode through the use of the sliding pressure concept. The invention described is particularly applicable to combined cycle power plants.

Priluck, D.M.; Wagner, J.B.

1982-05-11T23:59:59.000Z

482

Method for the shutdown and restarting of combined power plant  

SciTech Connect

In shutting down a combined power plant, a steam turbine is first shutdown while operation of a gas turbine at high load is being continued, and the steam generated in a waste heat recovery boiler is passed on to a condenser through a bypass system bypassing the steam turbine. The gas turbine is then shutdown when this condition prevails, and gland sections of the steam turbine receive a supply of gland sealing steam which has been heated by a heater to a temperature level close to that of the steam attained while the steam turbine is in operation, thereby to maintain the temperature of the metal of the steam turbine gland sections at a desired level during the time the steam and gas turbines are shutdown. In restarting the combined plant, the gas turbine is first started and then the steam turbine is started.

Hashimoto, T.; Kuribayashi, T.

1981-08-11T23:59:59.000Z

483