National Library of Energy BETA

Sample records for maturation plan tmp

  1. Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming...

    Office of Environmental Management (EM)

    ... design work for FBSR remote operations currently ... Industrial Association Systems Engineering Conference, October 20, 2003. Technology Maturation Plan (TMP) ...

  2. Technology Readiness Assessment (TRA)/Technology Maturation Plan (TMP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Guide | Department of Energy Readiness Assessment (TRA)/Technology Maturation Plan (TMP) Process Guide Technology Readiness Assessment (TRA)/Technology Maturation Plan (TMP) Process Guide This document is a guide for those involved in conducting TRAs and developing TMPs for DOE-EM. Technology Readiness Assessment (TRA)/Technology Maturation Plan (TMP) Process Guide (1.19 MB) More Documents & Publications Technology Readiness Assessment Report Small Column Ion Exchange Technology

  3. Technology Maturation Plan (TMP) Wet Air Oxidation (WAO) Technology for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tank 48H Treatment Project (TTP) | Department of Energy Wet Air Oxidation (WAO) Technology for Tank 48H Treatment Project (TTP) Technology Maturation Plan (TMP) Wet Air Oxidation (WAO) Technology for Tank 48H Treatment Project (TTP) This assessment determines the technology maturity level of the candidate Tank 48H treatment technologies that are being considered for implementation at DOE's SRS - specifically Wet Air Oxidation. Technology Maturation Plan (TMP) Wet Air Oxidation (WAO)

  4. Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology for Tank 48H Treatment Project (TTP) | Department of Energy Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP) Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP) This assessment determines the technology maturity level of the candidate Tank 48H treatment technologies that are being considered for implementation at DOE's SRS - specifically Fluidized Bed Steam Reformer System.

  5. Technology Readiness Assessment (TRA)/Technology Maturation Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide This ...

  6. Technology Maturation Plans (TMPs) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tank Waste and Waste Processing » Technology Maturation Plans (TMPs) Technology Maturation Plans (TMPs) Documents Available for Download November 1, 2007 Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP) This assessment determines the technology maturity level of the candidate Tank 48H treatment technologies that are being considered for implementation at DOE's SRS - specifically Fluidized Bed Steam Reformer System. November 1,

  7. Technology Maturation Plan (TMP) Wet Air Oxidation (WAO) Technology...

    Office of Environmental Management (EM)

    ... Organization MOC Materials-of-Construction NASA National Aeronautics and Space ... National Aeronautics and Space Administration (NASA) to be prerequisite to final design. ...

  8. TMP: Order (2013-CE-5334)

    Broader source: Energy.gov [DOE]

    DOE ordered TMP Manufacturing Company, Inc. to pay a $8,000 civil penalty after finding TMP had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  9. Preliminary Technology Maturation Plan for Immobilization of High-Level Waste in Glass Ceramics

    SciTech Connect (OSTI)

    Vienna, John D.; Crum, Jarrod V.; Sevigny, Gary J.; Smith, G L.

    2012-09-30

    A technology maturation plan (TMP) was developed for immobilization of high-level waste (HLW) raffinate in a glass ceramics waste form using a cold-crucible induction melter (CCIM). The TMP was prepared by the following process: 1) define the reference process and boundaries of the technology being matured, 2) evaluate the technology elements and identify the critical technology elements (CTE), 3) identify the technology readiness level (TRL) of each of the CTE’s using the DOE G 413.3-4, 4) describe the development and demonstration activities required to advance the TRLs to 4 and 6 in order, and 5) prepare a preliminary plan to conduct the development and demonstration. Results of the technology readiness assessment identified five CTE’s and found relatively low TRL’s for each of them: • Mixing, sampling, and analysis of waste slurry and melter feed: TRL-1 • Feeding, melting, and pouring: TRL-1 • Glass ceramic formulation: TRL-1 • Canister cooling and crystallization: TRL-1 • Canister decontamination: TRL-4 Although the TRL’s are low for most of these CTE’s (TRL-1), the effort required to advance them to higher values. The activities required to advance the TRL’s are listed below: • Complete this TMP • Perform a preliminary engineering study • Characterize, estimate, and simulate waste to be treated • Laboratory scale glass ceramic testing • Melter and off-gas testing with simulants • Test the mixing, sampling, and analyses • Canister testing • Decontamination system testing • Issue a requirements document • Issue a risk management document • Complete preliminary design • Integrated pilot testing • Issue a waste compliance plan A preliminary schedule and budget were developed to complete these activities as summarized in the following table (assuming 2012 dollars). TRL Budget Year MSA FMP GCF CCC CD Overall $M 2012 1 1 1 1 4 1 0.3 2013 2 2 1 1 4 1 1.3 2014 2 3 1 1 4 1 1.8 2015 2 3 2 2 4 2 2.6 2016 2 3 2 2 4 2 4

  10. bnkb260.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ,:,, , ., ..., ,+ . :, ,. ., ,., ,, '..' . ..1.1 .3 ,:.. .;. ,. ,7.. DOE/NE/32117-Hl ./. .;, Atomic Power ,., .,. ,,, ,'., ; .,, ,?, ,, ... ,.,,, .,, ~,,;, ,, ', ,, v . r .,. ,'*,; : ,- ,,, ,,. , ,;..,. -,,. ,,; , '/., - :., ,, ~,/, ... . , ,' .,' J ,. ,1, , ,.,' ,.,'.., 'r, . In Space A History March 1987 DOE/NE/32117--Hl DE87 010618 ., . Prepared by: ,; Planning G Human Systems, Inc. Washington, DC $3 ,: Under Contract No. DE-AC01;NE32117 ,. ., ,, Prepared for: U.S. Department of Energy

  11. nas82d5.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    narac NNSA & Nuclear Security Enterprise support nation's preparedness Scientists at NNSA facilities study climate and meteorology. Other sites are key players in weather preparedness. Today, on National Weatherperson Day, NNSA recognizes numerous contributions to the nation's climate and weather readiness in any situation. With emergency response as one of its core... Emergency Response Planning for Emergencies Exercise Program Field Assistance and Oversight Liaison Homeland Security and

  12. TECHNOLOGY MATURATION PLAN FOR ALUMINUM REMOVAL AND SODIUM HYDROXIDE REGENERATION FROM HANFORD WASTE BY LITHIUM HYDROTALCITE PRECIPITATION

    SciTech Connect (OSTI)

    SAMS TL; GUILLOT S

    2011-01-27

    This Technology Maturation Plan schedules the development process that will bring the Lithium Hydrotalcite waste pretreatment process from its current estimated Technology Readiness Level of 3, to a level of 6. This maturation approach involves chemical and engineering research and development work, from laboratory scale to pilot scale testing, to incrementally make the process progress towards its integration in a fully qualified industrial system.

  13. Scale-Up Maturation Plan for Digestion of Graphite Fuel Pebbles

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scale-Up Maturation Plan for Digestion of Graphite Fuel Pebbles Official Use Only Pre-decisional Draft R. A. Pierce K. M. Fox June 2014 SRNL-RP-2014-00464, Revision 0 SRNL-RP-2014-00464 Revision 0 -- Official Use Only -- ii DISCLAIMER This work was prepared under an agreement with and funded by the U.S. Government. Neither the U.S. Government or its employees, nor any of its contractors, subcontractors or their employees, makes any express or implied: 1. warranty or assumes any legal liability

  14. Biological pretreatment for thermomechanical (TMP) and chemithermomechanical (CTMP) pulping processes

    SciTech Connect (OSTI)

    Myers, G.C.; Akhtar, M.; Lentz, M.

    1996-10-01

    Treatment of wood chips with lignin-degrading fungi prior to preparing a refiner mechanical pulp (RMP) has substantially reduced energy consumption and increased paper strength properties. This study reports on thermomechanical (TMP) and chemithermo-mechanical pulping (CTMP) of fungus treated wood chips. Loblolly pine chips were innoculated with Ceriporiopsis subvermispora, strain L14807 SS-3, and incubated two weeks in a chip silo. A pressurized 305 mm diameter disk refiner was used to prepare TMP and CTMP`s from fungal treated and non-treated wood chips. Two procedures were used to prepare the CTMP`s, injecting a sodium hydroxide and hydrogen peroxide solution into the pressurized refiner, and impregnating the wood chips with a sodium sulfite solution. Energy consumption during pulp preparation and handsheet strength and optical properties will be presented and discussed.

  15. Optimization of esterification of oleic acid and trimethylolpropane (TMP) and pentaerythritol (PE)

    SciTech Connect (OSTI)

    Mahmud, Hamizah Ammarah; Salimon, Jumat

    2014-09-03

    Vegetable oil (VO) is the most potential alternative to replace mineral oil for lubricant due to better lubricating properties and great physicochemical properties. Chemical modification has to be done to overcome low temperature performance and low oxidation instability due to the presence of β-hydrogen atoms of glycerol molecule. The optimization of esterification of oleic acid and polyhydric alcohol with sulfuric acid catalyst was carried out to find the optimum conditions with the highest yield. Reeaction variables such as; molar ratio, temperature, duration and catalyst concentration. Two types of polyhydric alcohol have been used; TMP and PE. The optimum results showed oleic acid successfully converted 91.2% ester TMP and 92.7% ester PE at duration: 5 hours (Ester TMP), 6 hours (Ester PE); temperature: 150°C (ester TMP), 180°C (Ester PE); catalyst concentration: 1.5% (w/w); and mol ratio: 3.9:1 (ester TMP), 4.9:1 (ester PE). From the data obtained, mole ratio showed most influenced factors to the increasing yields of ester conversions.. The TMP/PE ester was confirmed using gas chromatography (GC-FID), Fourier Transform Infrared Spectroscopy (FTIR) and Nuclear Magnetic Resonance (NMR)

  16. Technology Validation | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Technology for Tank 48H Treatment Project (TTP) | Department of Energy Fluidized Bed Steam Reformer System. Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP) (308.93 KB) More Documents & Publications Technology Maturation Plan (TMP) Wet Air Oxidation (WAO) Technology for Tank Tank 48H Treatment Project (TTP) | Department of Energy

    Wet Air Oxidation. Technology Maturation Plan (TMP) Wet Air Oxidation (WAO)

  17. Marketplace Maturity | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Marketplace Maturity Marketplace Maturity Photo of houses with solar panels on the roof. DOE supports advances in the solar market through innovation as well as ...

  18. zjta204.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stall Regulation of the Darrieus Turbine J.W. Oler, J.H. Strickland B. J.Im, G. H. Graham Department ofMechanical Engineering Texas Tech University Lubbock,Texas 79409 Under...

  19. skef103.tmp

    Office of Scientific and Technical Information (OSTI)

    ... in the context of metal ion extraction and, often, dehydration upon transfer to an organic phase. Use of soft ... actinides provides the framework for discussion of the ...

  20. lzi8385.tmp

    Office of Scientific and Technical Information (OSTI)

    NUREG66410 I EVALUATION OF MODAL COMBINATION METHODS FOR SEISMIC RESPONSE SPECTRUM ANALYSIS >aper ID K4-A4-US Morante, Richard* Brookhaven National Laboratory Building 130,32 Lewis ...

  1. zah7074.tmp

    Office of Scientific and Technical Information (OSTI)

    ... In thermoacoustic systems, including linear-motor, &-piston Stirling systems, oscillating ... power required by the reiiigerator; supplied by external means such as an electric motor. ...

  2. simd051.tmp

    Office of Scientific and Technical Information (OSTI)

    New Mexico 88220. E-mail: ywang@sandia.gov **Department of Earth and Planetary Sciences, The University of New Mexico, Albuquerque, New Mexico 87131. E-mail: hfku@J.mrn.edu ...

  3. ega3322.tmp

    Office of Scientific and Technical Information (OSTI)

    activity of the human brain. These initial successes of imaging the human brain soon led to applications in the human heart (Schelbert et al., 1980), and quickly radiochemists...

  4. uxo8374.tmp

    Office of Scientific and Technical Information (OSTI)

    or process disclosed, or represent that its use would not infringe privately owned rights. ... as for maintenance operations; or, . as a result of human error or malicious mischief. ...

  5. smt24.tmp

    Office of Scientific and Technical Information (OSTI)

    ... The above calculation assumes that uraninite is dominated by U(4+). However, naturally-occurring uraninite contains a sig- nificant fraction of U(6+). The EELS spectra indicate ...

  6. lapa264.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Applied to Use of Adaptive Blades on aVariable Speed Wind Turbine G. Richard Eisler Advanced Engineering and Manufacturing Software Paul S. Veers Wind Energy...

  7. wexe294.tmp

    Office of Scientific and Technical Information (OSTI)

    by an agency of the United States Government Neither tie ... a groundwater recharge rate of 15 irdyr (Geraghty & ... B, loss due to microbial death, and growth based on ...

  8. wxwe185.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Task 7 Different approaches to the design of decay heat removal systems have been evaluated. A PRISM like RVACS system was adopted for the ENHS. If cover-gas lift-pump will be ...

  9. azg7193.tmp

    Office of Scientific and Technical Information (OSTI)

    ... oil leakage to the outside. 18 The turbinegenerator is designed with safeguards built into the controls to prevent catastrophic bearing failures due to loss of lubricating oil. ...

  10. cbj7362.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6584 August 1994 (T/E) THE DISCOVERY OF THE TAU ILEPTON PART I: THE EARLY HISTORY THROUGH 1!J75 PART 11: CONFIRMATION OF THE DISCOVERY AND MEASUREMENT OF MAJOR PROPERTIES, 1976-1982' Martin L. Perl Stanford Linear Accelerator Center Stanfoni University Stanfonf, California 94309 To be pubiished in the Proceedings of the Internatimd Conference on the H&ory of Original Ideas and Basic Discoveries in Particle Physics, Ettore Majorana Centre for Scientific Culture, Erice, Sicilyj July X+@@ 4,

  11. cym1291.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cyber Information Security Information security deals with requirements for the protection and control of information and matter required to be classified or controlled by statutes, regulations, or NNSA and Department of Energy (DOE) directives.Classified Matter Protection and Control ensures the protection and control of

    cybersecurity NNSA's Defense Nuclear Nonproliferation leaders gather in nation's capital Recently, the NNSA held the fourth meeting of the Office of Defense Nuclear

  12. xwhd395.tmp

    Office of Scientific and Technical Information (OSTI)

    herein do not necessarily state or refiect those of the ... thermodynamically y stable solid, until the carbon dioxide ... the soluble salts prior to preparation for XRD analysis. ...

  13. otp7134.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Biological and Environmental Research ................................................................................................................................................ ........................ ........................ ........................ . Us. Department of Energy A TAL EGACY I Biological and Environmental Research in the Atomic Age September 1.997 (M-" MASTER dtf3ww3tm0N m THIS DCXXJMW Is UNLf?t/Im -. . . . . . ----- --' -.. . . . . .,-:. ,. ..- -,-- . . . . .

  14. ymna125.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wyoming

    y12 On Womens Equality Day, we celebrate NNSA's talented Women in STEM Uranium Processing Facility Project Celebrates Changing the Skyline of Y-12 NNSA innovation fuels space exploration Today, in accordance with a 1971 Presidential proclamation, the United States commemorates the first human setting foot on the moon. As a science agency, NNSA's technology and development have given rise to extraterrestrial innovation and enabled other-worldly achievements. From... Klotz visits Y-12

  15. rzq8042.tmp

    Broader source: Energy.gov (indexed) [DOE]

    ... dip, an:i identification of stratigrathic contacts; ii) Structural geology: description of local and regional structural features (e.g., folding, faulting, tilting, jointing, ...

  16. mhm3361.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... are the National Electric Safety Code (NESC), ... and for reducing losses for filter inductors and line-fi-equency ... via essentially inductive transmission lines. ...

  17. zah7074.tmp

    Office of Scientific and Technical Information (OSTI)

    ... engines and refrigerators in terms of energy- conservation, power flows, and ... An appendix gives some DeltaE files; I may drop this from the final version of the book, ...

  18. bhr7193.tmp

    Office of Scientific and Technical Information (OSTI)

    5551 Test of a Magnetic Device for the Amelioration of Scale Formation at Treatment ... port Royal Rd., Springfield VA 22161 .-- Test of a Magnetic Device for the Amelioration ...

  19. cks154.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Fluids 6,4019 (1994). 5 D.R. Farley et al., these proceedings. 6 L.M. Logory et al., these proceedings. 7 E.M. Campbell, Lasers and Particle Beams 9,209-231 (1991). 8 R.T. ...

  20. xwhd395.tmp

    Office of Scientific and Technical Information (OSTI)

    ... 0.26 100 0.00 0.00 96 110 2.3 1.24 49 0.51 100 1.00 4.06 42 15 3.8 2.47 5.3 2.57 100 ... Waste Isolation Pilot Plant, Carlsbad Area OffIce. von der Borch, C., 1965. The ...

  1. utu2313.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Primary surface recuperators have been developed over a very long period of time by Solar. ... tends to set the acceptable price level for units produced in substantial volume. ...

  2. wkpd080.tmp

    Office of Scientific and Technical Information (OSTI)

    L. P. Ku, G. Y. Fu, D. Monticello, A. Reiman Princeton Plasma Physics Laboratory Princeton, NJ 08543 A. Boozer Columbia University New, York, NY 10027 ABSTRACT Quasi-axisyetry, ...

  3. cnc7233.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Hence, explosive selection depends strongly on the target. In this effort our primary thrust is fragment generation, although we are formulating some materials at each extreme. ...

  4. ise1082.tmp

    Office of Scientific and Technical Information (OSTI)

    . ' I T SZ?A+J02GM?0--L S5O5C THERMODYNAMIC STABILITY OF ACTINIDE PYROCHLORE MINERALS IN ... Using the Gibbs free energies of 2 :, 1 formation of CaZrTi207 and CaHfTi20T phases 8, ...

  5. xsd20.tmp

    Office of Scientific and Technical Information (OSTI)

    ... the 703OCupronickel (CDA 715) and nickel-copper (M-CU) Alloy 400, are also being ... The highest corrosion rate for carbon steel was obsemed when it was coupled to pure copper...

  6. cnc7233.tmp

    Office of Scientific and Technical Information (OSTI)

    ... on opposite sides of a 2.54 mm copper cylinder wall with the Fabry-Perot interferometer. ... rxn S0.04 neat o.k. wmild steel o.k. wcopper RX-35-EK 109.8 >36.0 no rxn <0.02-().64 ...

  7. umk2001.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Another motivation for laboratory-scale studies was to evaluate whether spatial scaling da&XIShipS might eXkt. (h?2pafk)ll Of best-fit d Values from eXperilnellts at dlree spatial ...

  8. mho8364.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Isot. 19:345-351. ,. Jungerrnaq J.A., Lagunas-Solar, M.C. (1981), Cyclotron Production of ... of 5-1241Iodo-2'- deoxyuridine for Functional Imaging of Cell ProMeration in vivo. ...

  9. fgr3372.tmp

    Office of Scientific and Technical Information (OSTI)

    ... of Science, Office of Basic Energy Science, Division of Materials Sciences of the ... GaN, a wide direct bandgap semiconductor, and its alloys with AIN and InN, have realized, ...

  10. xsd20.tmp

    Office of Scientific and Technical Information (OSTI)

    Neither the United States Government nor the University of California nor any of their ... or favoring by the United States Government or the University of California. ...

  11. jkpc171.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Phillip Wesson assisted during the transition; then, in March 1950, Frank L. Dewey was ... the University could not "protect its or the government's interests at branch stations." ...

  12. hax1244.tmp

    Office of Scientific and Technical Information (OSTI)

    ... From the strong linear correlation between and pa for each group and the common slope ... The consequence of this assertion is that the work function corresponds exactly to the ...

  13. btzf096.tmp

    Office of Scientific and Technical Information (OSTI)

    xerogels using post-processing moaljzation of the ... allows for the introduction of high levels of ... gels were prepared by the sol-gel polymerization of ...

  14. kzu7205.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Figure 3.1. Electronic Setup for Measuring Pulse Shapes for Gamma-Ray and Neutron ... The wide time window necessary when measuring thermal neutrons greatly increases the ...

  15. mbca122.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III: The Manhattan Engineer District Initial Problems Summer 1942-during which the American island- hopping campaign in the Pacific began at Guadalcanal-proved to be a troublesome one for the fledgling bomb project. Colonel James C. Mar- shall received the assignment of directing the Laboratory for the Development of Substitute Metals, or DSM. Marshall immediately moved from Syracuse to New York City, where he set up the Manhattan Engineer District, established by general orderon

  16. nup2350.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  17. pgqe041.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Theory of High-TCSuperconducting Cuprates Based on Experimental Evidence A.A. Abrikosov Materials ScienceDivision, Argonne National Laboratory, 9700 S. Cass Ave., Argonne, IL 60439 ~~~~'~~~ $ .- ., f '~~ 1~ *J,; ,. % %?, To be Published in the Proceedings of the 6" International Conference on Materials and Mechanisms of Superconductivity and High-Temperature Superconductors VI, Houston, Texas, February, 20-25,2000, Physics C The submitted manuscript has been created by the University of

  18. poy9235.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Early GovernmentSupport before an explosivedevicecould be detonated}4 Bush reconstituted theNational Academy of Sciences committee and instructed it to assess the recommendations contained in the frost report from an engineering standpoint. On July 11 the second committee endorsed the frst report and supported continuation of isotope separation work and pile research for scientific reasons, though it admitted that it could promise no immediate applications. The second report, like the f~st, was

  19. rqxb180.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Department of Energy FY 2014 Congressional Budget Request State Tables P li i Preliminary April 2013 Office of Chief Financial Officer DOE/CF-0092 Department of Energy FY 2014 Congressional Budget Request State Tables P li i Preliminary The numbers depicted in this document represent the gross level of DOE budget authority for the years displayed. Th fi i l d b th th di ti d d t f di i th b d t Th d t id The figures include both the discretionary and mandatory funding in the budget. They do

  20. sdy1031.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    &'!!#llR'!e Program United States Department of Energy Office of Energy Research Office of Health and Environmental Research @ #j$Top%$ ~%mo$~ i~f $ April 1992 THIS DOCUMENT IS UNLIMITED The "Primer on Molecular Genetics" is taken from the April 1992 draft of the DOE Human Genome 799 7-92 Program Report, which is expected to be published in May 1992. The primer is intended to be an introduction to basic principles of molecular genetics pertaining to the genome project. The

  1. tqz1334.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 . .-: .? ,,., .,.,,,.,.. 1.JCIW93152 PREPRINT Destruction of the Fractional Quantum !-tall Effect by Disorder R. B. Laughlin Lawrence Liver'more National Laboratory Lhiversity of California Livermon?, CA 94550 This paper was pr~pared for submitta? to the Yamada Conference XIII on Electronic Properties of Two-Oim#sional Svstems DXSCLMMER This docwrsent was prepared m an account of work sponsored by an agency of the LJ!dtedStates Government. Neither the United Smtes Gowxnmenf nor the University

  2. uca9041.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    . DISCLAIMER This repofi was.prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privateiy owned rights. Reference herein to any

  3. usb8331.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 (Released February 6, 1997) Energy Information Administration Energy Information Administration/Short-Term Energy Outlook -- February 1997 What's New This Month Here are the highlights of the changes to the forecast that we have made for the month of February, 1997: Mid Case Prices: Oil Prices: Crude oil prices have not started as sharp a fall-off from the December 1996 peak as previously assumed. Thus, we now portray a more gradual decline through the summer, with average imported prices in

  4. wgc300.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Short-Term Energy Outlook - March 2016 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 % Change Natural Gas Northeast Consumption (Mcf**) 80.3 75.7 80.7 66.4 76.1 84.0 84.7 69.9 -17.5 Price ($/mcf) 15.83 13.31 12.66 12.21 11.71 11.53 10.85 10.65 -1.8 Expenditures ($) 1,272 1,007 1,022 812 891 969 919 745 -19.0 Midwest Consumption (Mcf) 80.7 78.6 80.2 65.4 77.6 88.1 83.1 70.0 -15.8 Price ($/mcf) 11.47 9.44 9.23 8.99 8.36 8.69 8.55 7.37 -13.9 Expenditures ($) 926 742 740 587 648 766 711 516

  5. rzq8042.tmp

    Office of Environmental Management (EM)

    9, 1999 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman (Signed) Inspector General SUBJECT: INFORMATION : Report on "The Office of Defense Programs Robotics and Intelligent Machines Projects" BACKGROUND Robotics and Intelligent Machines (RIM) are systems composed of machines, sensors, computers, and software capable of executing various tasks with minimal human intervention. They have wide range application for solving many operational challenges including nuclear waste cleanup

  6. cada115.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... a reasonable bladecable clearance distance. Other aspects of the cable design, which include the cable sag, the required bladecable clearance distance, thermal expansion ...

  7. sxi1110.tmp

    Office of Scientific and Technical Information (OSTI)

    ... - ---. i% interlaborato round-robin test series revealed that cast second ... Composition (wt Yo) of the Round-Robin Test Samples Sample Code Alloy 00c 00 Mn A ...

  8. svte073.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Sandia developed the model, conducted the laboratory tests, analyzed the test data, and ... diameters) upstream and downstream of the test item, whereas in the actual pump ...

  9. wgi2182.tmp

    National Nuclear Security Administration (NNSA)

    ... In the early twentieth century, physicists conceived of the atom as a miniature solar ... For any future test, he proposed finding a larger site, "preferably with a radius of at ...

  10. ckm4195.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Threshold effects concentration Threshold effect level U.S. Fish and Wildlife Service . ... Protection Agency (EPA), U.S. Fish and Wild- life Service (USFWS), ...

  11. lapa264.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with rotor loads. Optimization was applied as a "wrapper" around the industry-standard PROP performance analysis code. PROP models wind turbine operation as a quasi-steady process...

  12. idn2392.tmp

    National Nuclear Security Administration (NNSA)

    Prepared in cooperation with the Nevada Operations Office U.S. Department of Energy ... Clastic rocks in the head of Slick Draw consist of uniform, dark green-brown and red%own ...

  13. hiq333.tmp

    National Nuclear Security Administration (NNSA)

    ... before the lakes lower in the chain receive sufficient water to freshen (Smith, 1976). ... L fornia (fig. 1), in the spring of 1992 with a rotary, txuck-mounted coring rig (Smith, ...

  14. ackd290.tmp

    Office of Scientific and Technical Information (OSTI)

    of current engi- neering interest (e.g. oil and gas reservoirs, nuclear waste ... reservoir formations at the Lost Hills oil field (California) that exhibit this behavior. ...

  15. qryb240.tmp

    Office of Scientific and Technical Information (OSTI)

    SA-3179-FP Condensation Induced Water Hammer Safety M. A. Gintner DynCorp DatePublished ... D. Document utle E WHC Projsct or Pro@ram CONDENSATION INDUCED WATER HAMMER SAFETY ...

  16. fjfa282.tmp

    Office of Scientific and Technical Information (OSTI)

    ... satellite launched in 1963. Today U.S. satellites constantly monitor Russia, China, and other nations for nuclear tests and other illegal activities forbidden by international law. ...

  17. btzf096.tmp

    Office of Scientific and Technical Information (OSTI)

    (A) and after (B) pyrolysis at 300 "C for 1 hour. 3. Thermally-Induced Decarboxylations Thermal gravimetric analysis (TGA; Figure 2) was used to establish the onset temperature...

  18. etu5303.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Laboratories, 1987. 5. Burcat, A., and McBride, B.,"1 994 Ideal Gas Thermodynamic Data for Combustion and Air-Pollution Use", Technion Report TAE 697, 1993. 6. Benson, S.W., ...

  19. Performance Evaluation Plan (PEP) Pantex Plant Babcock & Wilcox...

    National Nuclear Security Administration (NNSA)

    ... A quantitative or qualitative method for ... Wireless Technology O-4S Develop Pantex Strategic Infrastructure Plan O-5S Develop and ... Readiness Assessment and Maturation Plans. f. ...

  20. Clean Energy Manufacturing Resources - Technology Maturation | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Maturation Clean Energy Manufacturing Resources - Technology Maturation Clean Energy Manufacturing Resources - Technology Maturation Find resources to help you commercialize and market your clean energy technology or product. For technology maturation, areas to consider include regulations and standards; exporting; product testing or demonstration; energy-efficient product qualifications; and energy efficiency and performance improvements for plants. For more resources, see the

  1. Technology Development Roadmaps - a Systematic Approach to Maturing Needed Technologies

    SciTech Connect (OSTI)

    John W. Colllins; Layne Pincock

    2010-07-01

    Abstract. Planning and decision making represent important challenges for all projects. This paper presents the steps needed to assess technical readiness and determine the path forward to mature the technologies required for the Next Generation Nuclear Plant. A Technology Readiness Assessment is used to evaluate the required systems, subsystems, and components (SSC) comprising the desired plant architecture and assess the SSCs against established Technology Readiness Levels (TRLs). A validated TRL baseline is then established for the proposed physical design. Technology Development Roadmaps are generated to define the path forward and focus project research and development and engineering tasks on advancing the technologies to increasing levels of maturity. Tasks include modeling, testing, bench-scale demonstrations, pilot-scale demonstrations, and fully integrated prototype demonstrations. The roadmaps identify precise project objectives and requirements; create a consensus vision of project needs; provide a structured, defensible, decision-based project plan; and, minimize project costs and schedules.

  2. Wind Program | Department of Energy

    Office of Environmental Management (EM)

    Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Implementation Guide Revision 1 August 2013 U.S. DOE Office of Environmental Management Revision 1, August 2013 TRA/TMP Process Implementation Guide Page 2 of 76 REVISION LOG Date Reason for Revision Revision 0, March 2008  Initial issue of EM guide Revision 1, August 2013  Updates based on lessons learned from completed TRAs  Incorporation of "working draft" appendices on TRL 7 calculator, and

  3. U.S. Department of Energy Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Implementation Guide Revision 1 August 2013 U.S. DOE Office of Environmental Management Revision 1, August 2013 TRA/TMP Process Implementation Guide Page 2 of 76 REVISION LOG Date Reason for Revision Revision 0, March 2008  Initial issue of EM guide Revision 1, August 2013  Updates based on lessons learned from completed TRAs  Incorporation of "working draft" appendices on TRL 7

  4. Small Wind Turbine Certifications Signal Maturing Industry |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Small Wind Turbine Certifications Signal Maturing Industry Small Wind Turbine Certifications Signal Maturing Industry January 6, 2014 - 10:00am Addthis A 5-kW wind turbine with a ...

  5. biz60c3.tmp

    Office of Scientific and Technical Information (OSTI)

    AN OPTICAL WATER VAPOR SENSOR FOR UNMANNED AERIAL VEHICLES By Timothy A. Berkoff, Paul L. ... consumption sensor for the measurement of water vapor concentrations in the troposphere ...

  6. masf2f0.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July, 1983 Reprinted November 1984 Aeroelastic Stability Analysis of a Darrieus Wind Turbine David Popelka Prepared by Sandia Nationall Laboratories Albuquerque, New Mexico...

  7. yzk90a0.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Themrocilemica Data of Pure Substances, 1989. VCH. I. Barin, O Knacke. and O. Kubaschewski, Thermochemical Propeies Of lnoranic Substances. 1977. Springer-J'erlag. N. A. Lange. ...

  8. udl41f5.tmp

    Office of Scientific and Technical Information (OSTI)

    INTRODUCTION Improvements in the miabiIity and eciency of power plants are directly purity of water and steam around the cycle. Copper transport is one of.the related to the ...

  9. izse0a3.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    USE IN WIND DESIGN: OF CARBON FIBERS TURBINE BLADE A SERI-8BLADE EXAMPLE Cheng-Huat Ong & Stephen W. Tsai Department of Aeronautics&Astronautics Stanford University Stanford, CA...

  10. dvz32d5.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    pE/?Ex-/~ . Origins of the Human Genome Project* )577.. @ The human genome project was borne of technology, grew into a science bureaucracy in the United States and throughout the world, and is now being transformed into a hybrid academic and commercial enterprise. The next phase of the project promises to veer more sharply toward commercial application, harnessing both the technical prowess of molecular biology and the rapidly growing body of knowledge about DNA structure to the pursuit of

  11. elz32c5.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    '1 1 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency" thereof,: nor Battelle Mem'orial Institute, nor any of their employees, makes any warranty, axpress or implied, or assumes any legal liability or respwsibility for the, accuracy, completeness: or usefulness of any information, apparatus, product, or pTocess disclosed,or representsthat its use would not infringe' privatelyowned

  12. eodd0d4.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ,. .,', , !, , '! " ,, /1' ., 1 ., ,' , I ,, ,' I ,. ,, ', ,' 1, 'I, ,, ,' ~s documcot was pmpmed ss an abcmmt of wofi" spomssr&Iby the Uni&l''Statcs ", ,,, , ' G@nrwnL Whik this doourncntis Imlkved to con+n Wrect information, rreithq' ,, 'the United States, Governnknt nor aoy agency thereof, ~or The Regents of tbe ' , ~,, ), 's \ I Un@ersity of California not any of their.pnrploycc.$. * ~)' warranty,qress Ot . . impfkd, or assumes any fc~l responsibility, for @rcaccuracy,

  13. zut12e1.tmp

    Office of Scientific and Technical Information (OSTI)

    of SAM depositions to factors such as the water content of the deposition solvent. ... and condensation reactions between water and FDTS. Light scattering experiments ...

  14. bnw32a1.tmp

    Office of Scientific and Technical Information (OSTI)

    herein do not necessarily state or reflect those of the ... 5.2 Preparation and Testing of Polymer ... evaporator to a damp solid, which was mixed with ...

  15. nro31b2.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    nnss NNSA Statement Regarding Nevada National Security Site Management & Operating Contract WASHINGTON - On August 26, 2016, the Department of Energy's National Nuclear Security Administration (DOE/NNSA) awarded the contract for the management and operation of the Nevada National Security Site (NNSS) to Nevada Site Science Support and Technologies Corporation (NVS3T). The... NNSA Awards Nevada National Security Site Management & Operating Contract to NVS3T Contract Award Provides Best

  16. gud31b0.tmp

    Office of Scientific and Technical Information (OSTI)

    ... The vessel was constructed using 2024-T351 aluminum that gives the vessel an empty weight ... A 13-pound piece of aluminum stock was placed inside both WETF high-quality, ...

  17. oazb2b2.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Graduate Research Assistant Phone: (423) 974-5310 ... However,such opinions representonlythe personal opinions of ... (those with digital read- outs or single-pole probes). ...

  18. zut12e1.tmp

    Office of Scientific and Technical Information (OSTI)

    ... of a surfactant bilayer with the head groups and a thin water layer in the layer interior. ... After vesicle rupture and solvent evaporation, the skin of the vesicle might lie flat on ...

  19. bnw32a1.tmp

    Office of Scientific and Technical Information (OSTI)

    Raw materials are shipped in by truck. or rail. A detailed analysis of the economic estimates for the baseline process is given in Appendix 4. The total capital investment for...

  20. nev91a0.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... turbine and is otherwise limited to the first few harmonics of this fundamental frequency. ... spectral densities of the first few harmonics of the fundamental rotational speed ...

  1. A9R7296.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  2. A9R7298.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  3. oazb2b2.tmp

    Office of Scientific and Technical Information (OSTI)

    ... Siewert sought to include the effect of copper on the formation of ferrite in duplex stainless steels. While developing the WRC 1988 diagram, a copper coefficient was considered. ...

  4. nev91a0.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    that a single stress level at each wind speed does not adequately describe the blade stress history. A statistical description is required. Blade stress data collected...

  5. szj91a2.tmp

    Office of Scientific and Technical Information (OSTI)

    Analysis of Thomsen Parameters for Finely Layered VTI Media James G. Berryman Patricia A. ... Analysis of Thomsen parameters for finely layered VTI media JamG. Berryman, Lawrence ...

  6. nro31b2.tmp

    Office of Environmental Management (EM)

    ... with 143 neutrons in the rare uranium-235 (.7 percent of ... the nuclei of various elements to disintegrate atoms. ... "the last, best hope of earth," deviated from the ...

  7. asjc0d2.tmp

    Office of Scientific and Technical Information (OSTI)

    ... al. (1997) for 1951-1 995. Annual mean station pressure was found to have increased ... over several specific areas of China (Fig. id): the northwest, the extreme south (the ...

  8. mylc2d4.tmp

    Office of Scientific and Technical Information (OSTI)

    , , Laser Beam Shaping Techniques 9m Q%Q Fred M. Dickey,* Louis S. Weichrnan, Richard N. ... A common requirement is a laser profile that is uniform over some cross-section. Such ...

  9. bpv60e1.tmp

    Office of Scientific and Technical Information (OSTI)

    ... 8. EXPERIMENTAL STUDY OF NANOFLUID HEAT TRANSFER 9. DEVELOPMENT OF NANOFLUIDS WITH ... Engineers now fabricate microscale devices such as microchannel heat exchangers, and ...

  10. iuv62d0.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    . ". .. -.. LBL--22392 DE87 003546 -..-__ The Hydrogen Bubble Chamber and the Strange Resonances Luis W. Ah@l&Z Lawrence Berkeley Laboratory University of California Berkeley, California 94720 June 1985 DISCLAIMER . This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the Unit~Shtes bvernment noranyagency thermf, norany of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi-

  11. rwj10d4.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    russia NNSA Partnership Successfully Removes All Remaining HEU from Uzbekistan WASHINGTON, DC - Today, the Department of Energy's National Nuclear Security Administration (DOE/NNSA) announced the successful return of the final 5 kilograms (approximately 11 pounds) of highly enriched uranium (HEU) spent fuel from the IIN-3M "Foton" research reactor in Tashkent, Uzbekistan to... US, Kazakhstan Cooperate to Eliminate Highly Enriched Uranium WASHINGTON D.C - The Department of Energy's

  12. tex21b5.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * .: ,.- -, DOE/GO/10270 -- T/ UV WATERWORKS OUTREACH SUPPORT QxvF-%io%153-- FINAL REPORT )33 %w'lJ!40h370 PETER MILLER NATURAL RESOURCES DEFENSE COUNCIL 1 U.S.DEPTOFEf&CR~ GOLDEN FIELO ~~cf I DISCLMMER Thii reportWaS prepared as an accountof worksponsored by an agency of the Umtcd StatssGomamcnL Neither theUnitedStatas Govcrnmcttt noranyagency thereof,nor any of theiranplo~ makesattywarranty, express or impiia&or assumes anylegalIiability or rcsponaIMity f= theaacttmcy, compktan~ or

  13. wsm83b2.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Part IE I rier more readily than molecules of a heavier one, this approach proposed to produce by myriad repetitions a gas increasingly rich in uranium-235 as the heavier uranium-238 was separated out in a system of cascades. Theoretically, this process could achieve high concentrations of uranium-235 but, like the electromagnetic method, would be extremely costly. British researchers led the way on gaseous diffusion, with John R. Dunning and his colleagues at Columbia University joining the

  14. osa61a4.tmp

    National Nuclear Security Administration (NNSA)

    ... transfers are first-order approximations ... 1949.0 1956.0 2007.0 2013.0 12:54 130 @ 22:16 13;44 l30@23:06 15:04 ... VAN B.4 RUN DATE: 8-Feb-99 AT ECHO CHECK && ...

  15. bpv60e1.tmp

    Office of Scientific and Technical Information (OSTI)

    ... However, when this surfactant was almost ready for commercialization, we learned that it is toxic to fish and therefore not environmentally friendly. Consequently, all subsequent ...

  16. uth93a1.tmp

    National Nuclear Security Administration (NNSA)

    ... Worman, F. C. V., 1969. Archeological inveigations at the U.S. Atomic Energy Commission's ... Emory's bacchari; Iittleleafmountain mahogany rabbitbrush green rabbitbmsh blackbrush ...

  17. osa61a4.tmp

    National Nuclear Security Administration (NNSA)

    ... Although the Green Book guidance provides a.general overview of what a DOE NEPA ... Department of Energy Documents (DOE 1995a), subsequently referred to as the "Framework." ...

  18. wjj42a6.tmp

    National Nuclear Security Administration (NNSA)

    ... that trigger permitting requirements and require compliance with National Ambient Air Quality Standards (NAAQS). Clean Water Act (Federal Water Pollution Control Alct, as amended). ...

  19. mylc2d4.tmp

    Office of Scientific and Technical Information (OSTI)

    ... 1. Their approach is geometrical optics, which assumes a large P. The design ... From a ray optics perspective, these sources produce a wavefront incident over a range of ...

  20. wgwd1c5.tmp

    Office of Scientific and Technical Information (OSTI)

    been a great commercial success for a variety of portable electronics applications due to their high cell voltage, attractive combination of energy and power, and good cycle life. ...

  1. cjue2e3.tmp

    Office of Scientific and Technical Information (OSTI)

    ... to have supplied silencer and noise suppression systems to the Navy and the Air Force. ... They claimed to have served with noise pollution control equipment various customers ...

  2. Electricity Subsector Cybersecurity Capability Maturity Model...

    Broader source: Energy.gov (indexed) [DOE]

    The Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) Version 1.1, which allows electric utilities and grid operators to assess their cybersecurity...

  3. Cybersecurity Capability Maturity Model - Frequently Asked Questions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Cybersecurity Capability Maturity Model (C2M2) program is intended to aid organizations of all types evaluate and make improvements to their cybersecurity programs. The model ...

  4. Cybersecurity Capability Maturity Model - Facilitator Guide ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Cybersecurity Capability Maturity Model (C2M2) program is intended to aid organizations of all types evaluate and make improvements to their cybersecurity programs. The model ...

  5. Energy Planning

    Broader source: Energy.gov (indexed) [DOE]

    Energy Planning Agenda * What is energy planning? * The process * The plan * Strategic Energy Planning (SEP) Workbook * Other resources 2 What is Energy Planning? * Brings desired ...

  6. Salt restrains maturation in subsalt plays

    SciTech Connect (OSTI)

    Mello, U.T. ); Anderson, R.N.; Karner, G.D. . Lamont-Doherty Earth Observatory)

    1994-01-31

    The thermal positive anomaly associated with the top of salt diapirs has attracted significant attention in modifying the temperature structure and history of a sedimentary basin. Here the authors explore the role of the negative thermal anomaly beneath salt in modifying the maturation history of the source rocks in subsalt sediments. Organic matter maturation is believed to follow temperature dependent chemical reactions. Therefore, any temperature anomaly associated with salt masses affects the nearby maturation of potential source rocks. The level of maturity of source rocks close to salt diapirs will differ from that predicted based on regional trends. The impact of the thermal anomaly on a given point will depend on the duration and distance of the thermal anomaly to this particular point. Consequently, the maturation history of source rocks in salt basins is closely related to the salt motion history, implying that a transient thermal analysis is necessary to evaluate the sure impact on maturation of the thermal anomalies associated with salt diapirism. The paper describes vitrinite kinetics, salt in evolving basins, correlation of salt and temperature, salt dome heat drains, and restrained maturation.

  7. Cybersecurity Capability Maturity Model - Frequently Asked Questions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (February 2014) | Department of Energy - Frequently Asked Questions (February 2014) Cybersecurity Capability Maturity Model - Frequently Asked Questions (February 2014) The Cybersecurity Capability Maturity Model (C2M2) program is intended to aid organizations of all types evaluate and make improvements to their cybersecurity programs. The model focuses on the implementation and management of cybersecurity practices associated with the information technology (IT) and operational technology

  8. Structure, function and dynamics in adenovirus maturation

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Mangel, Walter F.; San Martín, Carmen

    2014-11-21

    Here we review the current knowledge on maturation of adenovirus, a non-enveloped icosahedral eukaryotic virus. The adenovirus dsDNA genome fills the capsid in complex with a large amount of histone-like viral proteins, forming the core. Maturation involves proteolytic cleavage of several capsid and core precursor proteins by the viral protease (AVP). AVP uses a peptide cleaved from one of its targets as a “molecular sled” to slide on the viral genome and reach its substrates, in a remarkable example of one-dimensional chemistry. Immature adenovirus containing the precursor proteins lacks infectivity because of its inability to uncoat. The immature core ismore » more compact and stable than the mature one, due to the condensing action of unprocessed core polypeptides; shell precursors underpin the vertex region and the connections between capsid and core. Maturation makes the virion metastable, priming it for stepwise uncoating by facilitating vertex release and loosening the condensed genome and its attachment to the icosahedral shell. The packaging scaffold protein L1 52/55k is also a substrate for AVP. Proteolytic processing of L1 52/55k disrupts its interactions with other virion components, providing a mechanism for its removal during maturation. In conclusion, possible roles for maturation of the terminal protein are discussed.« less

  9. Structure, Function and Dynamics in Adenovirus Maturation

    SciTech Connect (OSTI)

    Mangel, Walter F.; San Martin, Carmen

    2014-11-21

    Here we review the current knowledge on maturation of adenovirus, a non-enveloped icosahedral eukaryotic virus. The adenovirus dsDNA genome fills the capsid in complex with a large amount of histone-like viral proteins, forming the core. Maturation involves proteolytic cleavage of several capsid and core precursor proteins by the viral protease (AVP). AVP uses a peptide cleaved from one of its targets as a molecular sled to slide on the viral genome and reach its substrates, in a remarkable example of one-dimensional chemistry. Immature adenovirus containing the precursor proteins lacks infectivity because of its inability to uncoat. The immature core is more compact and stable than the mature one, due to the condensing action of unprocessed core polypeptides; shell precursors underpin the vertex region and the connections between capsid and core. Maturation makes the virion metastable, priming it for stepwise uncoating by facilitating vertex release and loosening the condensed genome and its attachment to the icosahedral shell. The packaging scaffold protein L1 52/55k is also a substrate for AVP. Proteolytic processing of L1 52/55k disrupts its interactions with other virion components, providing a mechanism for its removal during maturation. Finally, possible roles for maturation of the terminal protein are discussed.

  10. DOE Releases Maturity Model to Better Protect the Nation's Grid...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maturity Model to Better Protect the Nation's Grid from Cybersecurity Threats DOE Releases Maturity Model to Better Protect the Nation's Grid from Cybersecurity Threats May 31, 2012 ...

  11. Measuring the maturity of a technology : guidance on assigning...

    Office of Scientific and Technical Information (OSTI)

    Risk is reduced in system acquisition by selecting mature technologies for inclusion in system development. TRLs are used to assess the maturity of evolving technologies...

  12. Structures of Cyanobactin Maturation Enzymes Define a Family...

    Office of Scientific and Technical Information (OSTI)

    Structures of Cyanobactin Maturation Enzymes Define a Family of Transamidating Proteases Citation Details In-Document Search Title: Structures of Cyanobactin Maturation Enzymes ...

  13. Comparison of maturity based on steroid and vanadyl porphyrin parameters: A new vanadyl porphyrin maturity parameter for higher maturities

    SciTech Connect (OSTI)

    Sundararaman, P. ); Moldowan, J.M. )

    1993-03-01

    Correlations are demonstrated between steriod maturity parameters and the porphyrin maturity parameter (PMP) which is based on the ratio of specific vanadyl porphyrins C[sub 28]E/(C[sub 28]E + C[sub 32]D) measured by HPLC. Measurements from a global selection of >100 rock extracts and oils show that PMP parallels changes in the C[sub 29]-sterane 20S/(20S + 20R) and tri/(tri + mono) aromatic steroid ratios, and that all three parameters appear to attain their maximum values at similar maturity levels. The triaromatic steroid side chain cracking parameter, TA I/(I + II), reaches approximately 20% of its maximum value when PMP has reached 100%. These results suggest that PMP is effective in the early to peak portion of the oil window. A new parameter, PMP-2, based on changes in the relative concentrations of two peaks in the HPLC fingerprint (vanadyl [open quotes]etio[close quotes] porphyrins), appears effective in assessing the maturity of source rocks beyond peak oil generation. In combination with PMP this parameter extends the effective range of vanadyl porphyrins parameters to higher maturities as demonstrated by a suite of oils from the Oriente Basin, Ecuador, South America. 22 refs., 6 figs., 1 tab.

  14. Maturity Model for Advancing Smart Grid Interoperability

    SciTech Connect (OSTI)

    Knight, Mark; Widergren, Steven E.; Mater, J.; Montgomery, Austin

    2013-10-28

    AbstractInteroperability is about the properties of devices and systems to connect and work properly. Advancing interoperability eases integration and maintenance of the resulting interconnection. This leads to faster integration, lower labor and component costs, predictability of projects and the resulting performance, and evolutionary paths for upgrade. When specifications are shared and standardized, competition and novel solutions can bring new value streams to the community of stakeholders involved. Advancing interoperability involves reaching agreement for how things join at their interfaces. The quality of the agreements and the alignment of parties involved in the agreement present challenges that are best met with process improvement techniques. The GridWise Architecture Council (GWAC) sponsored by the United States Department of Energy is supporting an effort to use concepts from capability maturity models used in the software industry to advance interoperability of smart grid technology. An interoperability maturity model has been drafted and experience is being gained through trials on various types of projects and community efforts. This paper describes the value and objectives of maturity models, the nature of the interoperability maturity model and how it compares with other maturity models, and experiences gained with its use.

  15. K Basins Sludge Treatment Process | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process K Basins Sludge Treatment Process Full Document and Summary Versions are available for download K Basins Sludge Treatment Process (27.17 MB) Summary - K Basins Sludge Treatment Process (185.69 KB) More Documents & Publications Compilation of TRA Summaries K Basins Sludge Treatment Project Phase 1 Technology Readiness Assessment (TRA)/Technology Maturation Plan (TMP) Process Guide

  16. Compilation of TRA Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TRA Summaries Compilation of TRA Summaries A compilation of all TRA Summaries Compilation of TRA Summaries (1.18 MB) More Documents & Publications K Basins Sludge Treatment Process Technology Readiness Assessment (TRA)/Technology Maturation Plan (TMP) Process Guide Technology Readiness Assessment Report

  17. Dental Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dental Plan Dental Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office...

  18. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

  19. Development of a fourth generation predictive capability maturity model.

    SciTech Connect (OSTI)

    Hills, Richard Guy; Witkowski, Walter R.; Urbina, Angel; Rider, William J.; Trucano, Timothy Guy

    2013-09-01

    The Predictive Capability Maturity Model (PCMM) is an expert elicitation tool designed to characterize and communicate completeness of the approaches used for computational model definition, verification, validation, and uncertainty quantification associated for an intended application. The primary application of this tool at Sandia National Laboratories (SNL) has been for physics-based computational simulations in support of nuclear weapons applications. The two main goals of a PCMM evaluation are 1) the communication of computational simulation capability, accurately and transparently, and 2) the development of input for effective planning. As a result of the increasing importance of computational simulation to SNL's mission, the PCMM has evolved through multiple generations with the goal to provide more clarity, rigor, and completeness in its application. This report describes the approach used to develop the fourth generation of the PCMM.

  20. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP Program Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") Program Planning Template More Documents & Publications...

  1. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Plans Medical Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Medical Plans The Lab offers employees the choice between two medical plans through Blue Cross Blue Shield of New Mexico (BCBS). Both medical plans offer free preventive care and in and out of network coverage from the same network of BCBS providers. High Deductible Health Plan (HDHP) - A more

  2. Oil and Natural Gas Subsector Cybersecurity Capability Maturity...

    Office of Environmental Management (EM)

    Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (ONG-C2M2) Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (ONG-C2M2) Oil and Natural ...

  3. Sandia National Laboratories SUMMiT VTM MEMS Process: Mature...

    Office of Scientific and Technical Information (OSTI)

    SUMMiT VTM MEMS Process: Mature Technology with an Exciting Future. Citation Details In-Document Search Title: Sandia National Laboratories SUMMiT VTM MEMS Process: Mature ...

  4. CYBERSECURITY CAPABILITY MATURITY MODEL (C2M2)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CYBERSECURITY CAPABILITY MATURITY MODEL (C2M2) Version 1.1 February 2014 Cybersecurity Capability Maturity Model Version 1.1 i TABLE OF CONTENTS Acknowledgments ........................................................................................................................................ iii 1. Introduction .............................................................................................................................................. 1 1.1 Intended Audience

  5. AlliedSignal capability maturity model assessment & improvement processes

    SciTech Connect (OSTI)

    Kuhn, C.

    1997-11-01

    This report contains viewgraphs on AlliedSignal capability maturity model assessment and improvement processes for software.

  6. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our

  7. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision Plan Vision Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Vision Plan The Lab offers employees and their eligible dependents free vision coverage through Vision Service Plan (VSP). The plan covers exams, contact lenses, eyeglass lenses and frames. Participants can use any provider but VSP network providers offer the best value and will file the claim

  8. Partnership Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership Plan July 2016 July 2016 Page 1 U.S. DRIVE Partnership Plan Table of Contents Foreword ....................................................................................................................................................... 2 Definition ...................................................................................................................................................... 3 Partners

  9. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  10. Legal Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legal Plan Legal Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Legal Plan Most people need legal advice at one time or another but high legal fees may prevent you from getting the necessary assistance. For a small monthly premium, employees can enroll in legal coverage through ARAG. The plan provides assistance with routine preventive or defensive matters and

  11. Electricity Subsector Cybersecurity Capability Maturity Model v. 1.1.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (February 2014) | Department of Energy Subsector Cybersecurity Capability Maturity Model v. 1.1. (February 2014) Electricity Subsector Cybersecurity Capability Maturity Model v. 1.1. (February 2014) The Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) Version 1.1, which allows electric utilities and grid operators to assess their cybersecurity capabilities and prioritize their actions and investments to improve cybersecurity, combines elements from existing

  12. Electricity Subsector Cybersecurity Capability Maturity Model v. 1.1.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (February 2014) | Department of Energy Subsector Cybersecurity Capability Maturity Model v. 1.1. (February 2014) Electricity Subsector Cybersecurity Capability Maturity Model v. 1.1. (February 2014) The Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) Version 1.1, which allows electric utilities and grid operators to assess their cybersecurity capabilities and prioritize their actions and investments to improve cybersecurity, combines elements from existing

  13. Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (February 2014) | Department of Energy Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (February 2014) Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (February 2014) The Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (ONG-C2M2) is a derivative of the Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) Version 1.1. The ES-C2M2 was developed in support of a White House initiative led by the Department of

  14. Water Management in Mature Oil Fields using Advanced Particle...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water Management in Mature Oil Fields using Advanced Particle Gels Final Report Contract ... 91 6.6.8 Resistance to Water Flow after Gel Placement in Conduits ...

  15. Measuring the maturity of a technology : guidance on assigning...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Measuring the maturity of a technology : guidance on assigning a TRL. ... for supplier-customer interactions at a very early stage in technology development. ...

  16. Maturation and Hardening of the Stabilized Radiometer Platforms...

    Office of Scientific and Technical Information (OSTI)

    Title: Maturation and Hardening of the Stabilized Radiometer Platforms (STRAPS) Field Campaign Report Measurements of solar and infrared irradiance by instruments rigidly mounted ...

  17. Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (ONG-C2M2) | Department of Energy Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (ONG-C2M2) Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (ONG-C2M2) Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (ONG-C2M2) The Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (ONG-C2M2) was established as a result of the Administration's efforts to improve electricity subsector cybersecurity capabilities, and to

  18. A9R729A.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  19. A9R729C.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  20. A9R729E.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  1. A9R72A0.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  2. A9R72A2.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  3. A9R72A4.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  4. A9R72A6.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  5. A9R72A8.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  6. A9R72AA.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  7. A9R72AC.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  8. A9R72AE.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  9. A9R72B0.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  10. A9RB1B5.tmp

    Gasoline and Diesel Fuel Update (EIA)

    Real Gross State Product (Billion $2009) New England ................ 858 869 863 867 869 874 878 883 888 892 896 901 864 876 894 Middle Atlantic .............. 2,399 2,435 2,450 2,455 2,459 2,473 2,487 2,499 2,507 2,519 2,531 2,542 2,435 2,479 2,525 E. N. Central ................. 2,236 2,250 2,269 2,277 2,278 2,288 2,298 2,309 2,322 2,333 2,344 2,353 2,258 2,293 2,338 W. N. Central ................ 1,048 1,055 1,057 1,058 1,060 1,066 1,072 1,078 1,084 1,090 1,096 1,102 1,054 1,069 1,093 S.

  11. Smart Grid Interoperability Maturity Model Beta Version

    SciTech Connect (OSTI)

    Widergren, Steven E.; Drummond, R.; Giroti, Tony; Houseman, Doug; Knight, Mark; Levinson, Alex; longcore, Wayne; Lowe, Randy; Mater, J.; Oliver, Terry V.; Slack, Phil; Tolk, Andreas; Montgomery, Austin

    2011-12-02

    The GridWise Architecture Council was formed by the U.S. Department of Energy to promote and enable interoperability among the many entities that interact with the electric power system. This balanced team of industry representatives proposes principles for the development of interoperability concepts and standards. The Council provides industry guidance and tools that make it an available resource for smart grid implementations. In the spirit of advancing interoperability of an ecosystem of smart grid devices and systems, this document presents a model for evaluating the maturity of the artifacts and processes that specify the agreement of parties to collaborate across an information exchange interface. You are expected to have a solid understanding of large, complex system integration concepts and experience in dealing with software component interoperation. Those without this technical background should read the Executive Summary for a description of the purpose and contents of the document. Other documents, such as checklists, guides, and whitepapers, exist for targeted purposes and audiences. Please see the www.gridwiseac.org website for more products of the Council that may be of interest to you.

  12. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    SciTech Connect (OSTI)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  13. A model-independent view of the mature organization

    SciTech Connect (OSTI)

    Hanna, M.; Langston, D.

    1996-12-31

    Over the last 10 years, industry has been dealing with the issues of process and organizational maturity. This focus on process is driven by the success that manufacturing organizations have had implementing the management principles of W. Edwards Deming and Joseph M. Juran. The organizational-maturity focus is driven by organizations striving to be ISO 9000 compliant or to achieve a specific level on one of the maturity models. Unfortunately, each of the models takes a specific view into what is a very broad arena. That is to say, each model addresses only a specific subset of the characteristics of maturity. This paper attempts to extend beyond these specific views to answer the general question, What is a mature organization and its relationship to Quantitative management and statistical process control?

  14. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----Chapter 7.1 (February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals

  15. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 ACTION PLAN 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this action plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and the Washington State Hazardous Waste Management Act. All actions required to be taken pursuant to this Agreement shall be taken in accordance

  16. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    end-use customers for measure installation or project implementation. BPA Action Plan for Energy Efficiency vi EXECUTIVE SUMMARY The Bonneville Power Administration is a leader in...

  17. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  18. EVALUATION OF SUPPLEMENTAL PRE-TREATMENT DEVELOPMENT REQUIREMENTS TO MEET TRL 6 ROTARY MICROFILTRATION

    SciTech Connect (OSTI)

    HUBER HJ

    2011-10-03

    In spring 2011, the Technology Maturation Plan (TMP) for the Supplemental Treatment Project (RPP-PLAN-49827, Rev. 0), Technology Maturation Plan for the Treatment Project (T4S01) was developed. This plan contains all identified actions required to reach technical maturity for a field-deployable waste feed pretreatment system. The supplemental pretreatment system has a filtration and a Cs-removal component. Subsequent to issuance of the TMP, rotary microfiltration (RMF) has been identified as the prime filtration technology for this application. The prime Cs-removal technology is small column ion exchange (ScIX) using spherical resorcinol formaldehyde (sRF) as the exchange resin. During fiscal year 2011 (FY2011) some of the tasks identified in the TMP have been completed. As of September 2011, the conceptual design package has been submitted to DOE as part of the critical decision (CD-1) process. This document describes the remaining tasks identified in the TMP to reach technical maturity and evaluates the validity of the proposed tests to fill the gaps as previously identified in the TMP. The potential vulnerabilities are presented and the completed list of criteria for the DOE guide DOE G 413.3-4 different technology readiness levels are added in an attachment. This evaluation has been conducted from a technology development perspective - all programmatic and manufacturing aspects were excluded from this exercise. Compliance with the DOE G 413.3-4 programmatic and manufacturing requirements will be addressed directly by the Treatment Project during the course of engineering design. The results of this evaluation show that completion of the proposed development tasks in the TMP are sufficient to reach TRL 6 from a technological point of view. The tasks involve actual waste tests using the current baseline configuration (2nd generation disks, 40 psi differential pressure, 30 C feed temperature) and three different simulants - the PEP, an AP-Farm and an S

  19. Cybersecurity Capability Maturity Model (February 2014) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy (February 2014) Cybersecurity Capability Maturity Model (February 2014) The Cybersecurity Capability Maturity Model (C2M2) was derived from the Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) Version 1.1 by removing sector-specific references and terminology. The ES-C2M2 was developed in support of a White House initiative led by the Department of Energy (DOE), in partnership with the Department of Homeland Security (DHS), and in collaboration with private- and

  20. Predicting technology operational availability using technical maturity assessment

    SciTech Connect (OSTI)

    Kenley, C.R.; Creque, T.R.

    1998-07-01

    A technical maturity assessment method was performed by systems engineers in collaboration with an advisory panel composed of team members from different Department of Energy sites and from different engineering and science disciplines. Various stabilization technologies were assessed annually as to their relative maturity and availability for use in stabilizing nuclear materials. After three years of assessments, several of the technologies are now components of operational systems. A regression analysis of the historical assessments was performed, and it was concluded that the numerical technical maturity score produced by a team of experts can provide a powerful predictor of the time remaining until the operational application of technologies.

  1. Oil and Natural Gas Subsector Cybersecurity Capability Maturity...

    Broader source: Energy.gov (indexed) [DOE]

    The Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model (ONG-C2M2) is a ... Oil and Natural Gas Subsector C2M2 v1.1 (February 2014) (1.82 MB) More Documents & ...

  2. Cybersecurity Capability Maturity Model - Facilitator Guide (February 2014)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy - Facilitator Guide (February 2014) Cybersecurity Capability Maturity Model - Facilitator Guide (February 2014) The Cybersecurity Capability Maturity Model (C2M2) program is intended to aid organizations of all types evaluate and make improvements to their cybersecurity programs. The model focuses on the implementation and management of cybersecurity practices associated with the information technology (IT) and operational technology (OT) assets and the environments in

  3. Disability Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through The Hartford. These income protection plans will pay a percentage of your salary when you are unable to work due to illness or injury. Resources STD highlight sheet ...

  4. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of financial resources and the latest financial tools to make saving for retirement easy. ... This plan allows you to save and invest a piece of your paycheck before taxes are taken ...

  5. Evacuation Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evacuation Planning (see also) This email address is being protected from spambots. You need JavaScript enabled to view it. - TRACC Director Background Evacuation planning in large metropolitan areas requires an analysis of the complex interactions among the initiating event, the affected population, and the systems for transporting the population and emergency responders. Predicting the effects of events, such as the dispersion of a harmful agent in the urban area or waterways, or the

  6. Predictive Capability Maturity Model for computational modeling and simulation.

    SciTech Connect (OSTI)

    Oberkampf, William Louis; Trucano, Timothy Guy; Pilch, Martin M.

    2007-10-01

    The Predictive Capability Maturity Model (PCMM) is a new model that can be used to assess the level of maturity of computational modeling and simulation (M&S) efforts. The development of the model is based on both the authors experience and their analysis of similar investigations in the past. The perspective taken in this report is one of judging the usefulness of a predictive capability that relies on the numerical solution to partial differential equations to better inform and improve decision making. The review of past investigations, such as the Software Engineering Institute's Capability Maturity Model Integration and the National Aeronautics and Space Administration and Department of Defense Technology Readiness Levels, indicates that a more restricted, more interpretable method is needed to assess the maturity of an M&S effort. The PCMM addresses six contributing elements to M&S: (1) representation and geometric fidelity, (2) physics and material model fidelity, (3) code verification, (4) solution verification, (5) model validation, and (6) uncertainty quantification and sensitivity analysis. For each of these elements, attributes are identified that characterize four increasing levels of maturity. Importantly, the PCMM is a structured method for assessing the maturity of an M&S effort that is directed toward an engineering application of interest. The PCMM does not assess whether the M&S effort, the accuracy of the predictions, or the performance of the engineering system satisfies or does not satisfy specified application requirements.

  7. Lab Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Plan Ames Laboratory

  8. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  9. Berkeley Lab Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links labview Strategic Planning Office The Strategic Planning Office coordinates institutional...

  10. Technology Readiness Assessment Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Readiness Assessment Report Technology Readiness Assessment Report This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the U.S. Department of Energy's Office of Environmental Management (DOE-EM). The Process Guide is intended to be a 'living document' and will be modified periodically as the understandings of TRA/TMP processes evolve. Technology Readiness

  11. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  12. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  13. file://C:\\Users\\deborahs\\AppData\\Local\\Temp\\tmp2581.tmp.htm

    National Nuclear Security Administration (NNSA)

    stateengineerbasinboundaries Shapefile Tags Hydrographic Basin Boundaries Summary The ... reviewed for agreement with State Engineer Basin Designation Orders and ...

  14. AmeriFlux US-Wi3 Mature hardwood (MHW)

    SciTech Connect (OSTI)

    Chen, Jiquan

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-Wi3 Mature hardwood (MHW). Site Description - The Wisconsin Mature Hardwood site is located in the Washburn Ranger District of the northeastern section of Chequamegon National Forest. A member of the northern coniferous-deciduous biome, surveys from the mid-19th century indicate the region consisted of a mixed stand of red, white, and jack pines. After extensive timber harvesting, wildfires, and farming activity, the region turned into a fragmented mosaic of stands of various ages and composition. As an assemblage, the ten Wisconsin sites are indicative of the successional stages of development in the predominant stand types of a physically homogeneous landscape. The mature hardwood stand represents a typical naturally regenerated second-growth forest, free of anthropogenic disturbances for at least 70 years.

  15. Thrift Savings Plan (TSP)

    Broader source: Energy.gov [DOE]

    The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees.

  16. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Stewardship Environmental Protection Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements...

  17. Atmospheric Radiation Measurement Program Science Plan. Current Status and

    Office of Scientific and Technical Information (OSTI)

    Future Directions of the ARM Science Program (Technical Report) | SciTech Connect Technical Report: Atmospheric Radiation Measurement Program Science Plan. Current Status and Future Directions of the ARM Science Program Citation Details In-Document Search Title: Atmospheric Radiation Measurement Program Science Plan. Current Status and Future Directions of the ARM Science Program The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate

  18. Alaska Strategic Energy Plan and Planning Handbook | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the ...

  19. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 STRATEGIC PLAN and Implementing Framework United States Department of Energy Office of Energy Efficiency and Renewable Energy (This page intentionally left blank) Message from the Assistant Secretary 1 Message from the Assistant Secretary Today, the United States is faced with a national imperative to address the enormous challenge presented by climate change and to seize upon the multi-trillion dollar economic opportunity that a transition to a global clean energy economy will provide. In his

  20. Demonstrating the improvement of predictive maturity of a computational model

    SciTech Connect (OSTI)

    Hemez, Francois M; Unal, Cetin; Atamturktur, Huriye S

    2010-01-01

    We demonstrate an improvement of predictive capability brought to a non-linear material model using a combination of test data, sensitivity analysis, uncertainty quantification, and calibration. A model that captures increasingly complicated phenomena, such as plasticity, temperature and strain rate effects, is analyzed. Predictive maturity is defined, here, as the accuracy of the model to predict multiple Hopkinson bar experiments. A statistical discrepancy quantifies the systematic disagreement (bias) between measurements and predictions. Our hypothesis is that improving the predictive capability of a model should translate into better agreement between measurements and predictions. This agreement, in turn, should lead to a smaller discrepancy. We have recently proposed to use discrepancy and coverage, that is, the extent to which the physical experiments used for calibration populate the regime of applicability of the model, as basis to define a Predictive Maturity Index (PMI). It was shown that predictive maturity could be improved when additional physical tests are made available to increase coverage of the regime of applicability. This contribution illustrates how the PMI changes as 'better' physics are implemented in the model. The application is the non-linear Preston-Tonks-Wallace (PTW) strength model applied to Beryllium metal. We demonstrate that our framework tracks the evolution of maturity of the PTW model. Robustness of the PMI with respect to the selection of coefficients needed in its definition is also studied.

  1. Metering Plan: Monitoring Energy and Potable Water Use in PNNL EMS4 Buildings

    SciTech Connect (OSTI)

    Pope, Jason E.

    2012-07-25

    This Plan presents progress toward the metering goals shared by all national laboratories and discusses PNNL's contemporary approach to the installation of new meters. In addition, the Plan discusses the data analysis techniques with which PNNL is working to mature using endless data streams made available as a result of increased meter deployment.

  2. 2013 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  3. 2014 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  4. 2015 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  5. DOE CONTRACTOR PENSION PLANS

    Broader source: Energy.gov (indexed) [DOE]

    ... plan(s) to maximize the contribution predictability (i.e. forecasting accuracy) and contain current and future costs, to include rationale for selection of all plan assumptions ...

  6. ORISE: Exercise Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exercise Planning Exercise Planning The Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the...

  7. Buried Waste Integrated Demonstration Plan

    SciTech Connect (OSTI)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  8. COPI selectively drives maturation of the early Golgi

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Papanikou, Effrosyni; Day, Kasey J.; Austin, Jotham; Glick, Benjamin S.

    2015-12-28

    COPI coated vesicles carry material between Golgi compartments, but the role of COPI in the secretory pathway has been ambiguous. Previous studies of thermosensitive yeast COPI mutants yielded the surprising conclusion that COPI was dispensable both for the secretion of certain proteins and for Golgi cisternal maturation. To revisit these issues, we optimized the anchor-away method, which allows peripheral membrane proteins such as COPI to be sequestered rapidly by adding rapamycin. Video fluorescence microscopy revealed that COPI inactivation causes an early Golgi protein to remain in place while late Golgi proteins undergo cycles of arrival and departure. These dynamics generatemore » partially functional hybrid Golgi structures that contain both early and late Golgi proteins, explaining how secretion can persist when COPI has been inactivated. Our findings suggest that cisternal maturation involves a COPI-dependent pathway that recycles early Golgi proteins, followed by multiple COPI-independent pathways that recycle late Golgi proteins.« less

  9. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  10. Subsea manifolds optimization -- The combination of mature and new technologies

    SciTech Connect (OSTI)

    Paulo, C.A.S.

    1996-12-31

    Subsea equipment can now be considered a mature option for offshore field developments. In Brazil, since the first oil in Campos Basin, different concepts ranging from one-atmosphere chambers to deepwater guidelineless X-mas trees, have been tested, contributing to this development. The experience acquired during these years makes it possible to combine the proven systems with new technologies being developed, for the design of subsea manifolds. The main target is more efficiency and cost reduction. When choosing a manifold concept, a usual rule is applicable: the simpler the better. The maturity, confidence and reliability obtained, allow the usage of resident hydraulically actuated valves, simplifying considerably the manifold arrangement. Other contributions come from: the reduction of piping bend radius allowed by the new pigs; the increased reliability of subsea instrumentation and chokes, allowing elimination of the gas-lift-test flowline; and the development of the direct vertical connection, that turns subsea tie-ins into very fast and easy operations. Combining all that with the new technology of a multiphase meter (to eliminate the test flowline and even the test separator on the platform), one can achieve a cost effective solution. This paper describes the possibilities of simplifying the subsea manifolds and presents a comparison of different designs. The usage of mature technology combined with the new developments, can help the industry to make deep water developments profitable, worldwide.

  11. AmeriFlux US-Wi4 Mature red pine (MRP) (Dataset) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Wi4 Mature red pine (MRP) Citation Details In-Document Search Title: AmeriFlux US-Wi4 Mature red pine (MRP) This is the AmeriFlux version of the carbon flux data for the site ...

  12. Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) The Electricity Subsector Cybersecurity Capability Maturity Model (ES-C2M2) was established as a result of the Administration's efforts to improve electricity subsector cybersecurity capabilities, and to understand the cybersecurity posture of the energy

  13. DOE Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Plans DOE Plans DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration Strategic Plan (PDF) DOE Chief Information Officer Strategic Plan Chicago Strategic Plan (PDF)

  14. Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning Presentation Agenda * Strategic Energy Planning - Strategic Energy Planning (SEP) Workbook - What is it? - The process - The plan * Activity 2 1/28/2016 2 Strategic Energy Plan and Planning Handbook * Provides a step-by-step process that Tribes may wish to use as a road map for discussion and decisions related to strategic energy planning and energy project prioritization * Includes blank text boxes for communities to input their own information and outcomes from energy

  15. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans...

    Office of Environmental Management (EM)

    ... the following factors: liquid effluent generation, gaseous effluent generation, secondary dangerous waste generation, and permitting requirements. Technical Maturity. ...

  16. Development and Implementation of a Program Management Maturity Model

    SciTech Connect (OSTI)

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  17. The Sandia MEMS passive shock sensor : FY07 maturation activities.

    SciTech Connect (OSTI)

    Houston, Jack E.; Blecke, Jill; Mitchell, John Anthony; Wittwer, Jonathan W.; Crowson, Douglas A.; Clemens, Rebecca C.; Walraven, Jeremy Allen; Epp, David S.; Baker, Michael Sean

    2008-08-01

    This report describes activities conducted in FY07 to mature the MEMS passive shock sensor. The first chapter of the report provides motivation and background on activities that are described in detail in later chapters. The second chapter discusses concepts that are important for integrating the MEMS passive shock sensor into a system. Following these two introductory chapters, the report details modeling and design efforts, packaging, failure analysis and testing and validation. At the end of FY07, the MEMS passive shock sensor was at TRL 4.

  18. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. ); Yancey, E.F. )

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  19. Tax-Advantaged Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tax-Advantaged Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow....

  20. ENERGY Workforce Restructuring Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ENERGY Workforce Restructuring Plan for the Idaho Operations Office March 2016 WORKFORCE RESTRUCTURING PLAN For the Idaho Operations Office Table of Contents I. INTRODUCTION...................................................................................................................................................... 1 Executive Summary ................................................................................................................................................ 1

  1. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permit for Storm Water Documents Individual Permit NPDES No. NM0030759 (pdf) Storm Water Plans Site Discharge Pollution Prevention Plan (SDPPP) Volume 1 - Los AlamosPueblo...

  2. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy physics through experiments that strengthen our fundamental understanding of matter, energy, space, and time. Plans HAWC gamma-Ray Observatory Data Management Plan (pdf)...

  3. ACQUISITION PLANNING | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACQUISITION PLANNING ACQUISITION PLANNING PDF icon ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Policy Flash 2015-13 POLICY FLASH 2014-25 Revision to the...

  4. ACQUISITION PLANNING | Department of Energy

    Energy Savers [EERE]

    ACQUISITION PLANNING ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Attachment FY2011-13 Attachment FY2011-40(3)...

  5. A reference map of the Arabidopsis thaliana mature pollen proteome

    SciTech Connect (OSTI)

    Noir, Sandra; Braeutigam, Anne; Colby, Thomas; Schmidt, Juergen; Panstruga, Ralph . E-mail: panstrug@mpiz-koeln.mpg.de

    2005-12-02

    The male gametophyte (or pollen) plays an obligatory role during sexual reproduction of higher plants. The extremely reduced complexity of this organ renders pollen a valuable experimental system for studying fundamental aspects of plant biology such as cell fate determination, cell-cell interactions, cell polarity, and tip-growth. Here, we present the first reference map of the mature pollen proteome of the dicotyledonous model plant species, Arabidopsis thaliana. Based on two-dimensional gel electrophoresis, matrix-assisted laser desorption/ionization time-of-flight, and electrospray quadrupole time-of-flight mass spectrometry, we reproducibly identified 121 different proteins in 145 individual spots. The presence, subcellular localization, and functional classification of the identified proteins are discussed in relation to the pollen transcriptome and the full protein complement encoded by the nuclear Arabidopsis genome.

  6. Adverse testicular effects of Botox in mature rats

    SciTech Connect (OSTI)

    Breikaa, Randa M.; Mosli, Hisham A.; Nagy, Ayman A.; Abdel-Naim, Ashraf B.

    2014-03-01

    Botox injections are taking a consistently increasing place in urology. Intracremasteric injections, particularly, have been applied for cryptorchidism and painful testicular spasms. Studies outlining their safety for this use are, however, scanty. Thus, the present study aimed at evaluating possible testicular toxicity of Botox injections and their effect on male fertility. Mature rats were given intracremasteric Botox injections (10, 20 and 40 U/kg) three times in a two-week interval. Changes in body and testes weights were examined and gonadosomatic index compared to control group. Semen quality, sperm parameters, fructose, protein, cholesterol and triglycerides contents were assessed. Effects on normal testicular function were investigated by measuring testosterone levels and changes in enzyme activities (lactate dehydrogenase-X and acid phosphatase). To draw a complete picture, changes in oxidative and inflammatory states were examined, in addition to the extent of connective tissue deposition between seminiferous tubules. In an attempt to have more accurate information about possible spermatotoxic effects of Botox, flowcytometric analysis and histopathological examination were carried out. Botox-injected rats showed altered testicular physiology and function. Seminiferous tubules were separated by dense fibers, especially with the highest dose. Flowcytometric analysis showed a decrease in mature sperms and histopathology confirmed the findings. The oxidative state was, however, comparable to control group. This study is the first to show that intracremasteric injections of Botox induce adverse testicular effects evidenced by inhibited spermatogenesis and initiation of histopathological changes. In conclusion, decreased fertility may be a serious problem Botox injections could cause. - Highlights: Botox injections are the trend nowadays, for both medical and non-medical uses. They were recently suggested for cryptorchidism and testicular spasms

  7. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)...

  8. Cybersecurity Capability Maturity Model (C2M2) Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Program Cybersecurity Capability Maturity Model (C2M2) Program Cybersecurity Capability Maturity Model (C2M2) Program The Cybersecurity Capability Maturity Model (C2M2) program is a public-private partnership effort that was established as a result of the Administration's efforts to improve electricity subsector cybersecurity capabilities, and to understand the cybersecurity posture of the grid. The C2M2 helps organizations-regardless of size, type, or industry-evaluate, prioritize,

  9. DOE Releases Maturity Model to Better Protect the Nation's Grid from

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cybersecurity Threats | Department of Energy Maturity Model to Better Protect the Nation's Grid from Cybersecurity Threats DOE Releases Maturity Model to Better Protect the Nation's Grid from Cybersecurity Threats May 31, 2012 - 4:32pm Addthis The Electricity Subsector Cybersecurity Capability Maturity Model, which allows electric utilities and grid operators to assess their cybersecurity capabilities and prioritize their actions and investments to improve cybersecurity, combines elements

  10. Exploration slack in mature areas, new producers more active

    SciTech Connect (OSTI)

    Vielvoye, R.

    1989-05-22

    This special report examines the current status of drilling, production, and refining activities, and what's being planned. Little money will be spent on exploration in most areas, but Iraq and Iran will spend billions reconstructing production and refining facilities. And some refiners in the region are anxious to expand into markets in Japan and other Far East consuming countries.

  11. Tribal Strategic Energy Plan and Planning Handbook

    Broader source: Energy.gov [DOE]

    The Tribal Strategic Energy Plan and Planning Handbook, published by the DOE Office of Indian Energy, is a tool for Tribes to use to help achieve energy goals in both the near- and long-term. This Handbook intends to help tribal leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

  12. Alaska Strategic Energy Plan and Planning Handbook

    Broader source: Energy.gov [DOE]

    The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

  13. X-ray Structure of the Mature Ectodomain of Phogrin

    SciTech Connect (OSTI)

    Noguera, M. E.; Primo, M.; Jakoncic, J.; Poskus, E.; Solimena, M.; Ermacora, M. R.

    2014-11-26

    Phogrin/IA-2? and ICA512/IA-2 are two paralogs receptor-type protein-tyrosine phosphatases (RPTP) that localize in secretory granules of various neuroendocrine cells. In pancreatic islet ?-cells, they participate in the regulation of insulin secretion, ensuring proper granulogenesis, and ?-cell proliferation. The role of their cytoplasmic tail has been partially unveiled, while that of their luminal region remains unclear. To advance the understanding of its structurefunction relationship, the X-ray structure of the mature ectodomain of phogrin (ME phogrin) at pH 7.4 and 4.6 has been solved at 1.95- and 2.01- resolution, respectively. Likewise to the ME of ICA512, ME phogrin adopts a ferredoxin-like fold: a sheet of four antiparallel ?-strands packed against two ?-helices. Furthermore, sequence conservation among vertebrates, plants and insects suggests that the structural similarity extends to all the receptor family. Crystallized ME phogrin is monomeric, in agreement with solution studies but in striking contrast with the behavior of homodimeric ME ICA512. The structural details that may cause the quaternary structure differences are analyzed. The results provide a basis for building models of the overall orientation and oligomerization state of the receptor in biological membranes.

  14. Decommissioning Plan RM

    Broader source: Energy.gov [DOE]

    The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

  15. Sample Project Execution Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  16. Climate Change Adaptation Planning

    Broader source: Energy.gov [DOE]

    This course provides an introduction to planning for climate change impacts, with examples of tribes that have been going through the adaptation planning process. The course is intended for tribal...

  17. State Energy Strategic Plans

    Broader source: Energy.gov [DOE]

    Most state energy offices across the country are required to have current and long-term strategic energy management plans in place. These strategic plans help to ensure that state agencies are...

  18. OIL AND NATURAL GAS SUBSECTOR CYBERSECURITY CAPABILITY MATURITY MODEL (ONG-C2M2)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OIL AND NATURAL GAS SUBSECTOR CYBERSECURITY CAPABILITY MATURITY MODEL (ONG-C2M2) Version 1.1 February 2014 Oil and Natural Gas Subsector Cybersecurity Capability Maturity Model Version 1.1 iii TABLE OF CONTENTS Acknowledgments ......................................................................................................................................... v 1. Introduction

  19. Action Plan - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Action Plan Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links Action Plan Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Executive Summary 1.0 Introduction 1.1 Purpose 1.2 Regulatory Authorities 1.3

  20. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  1. Biennial Plan Summary

    National Nuclear Security Administration (NNSA)

    ` Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary Report to Congress March 2016 National Nuclear Security Administration United States Department of Energy Washington, DC 20585 Department of Energy/National Nuclear Security Administration | March 2016 Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary | Page i Message from the Administrator This Department of Energy's (DOE) National Nuclear Security Administration (NNSA) Fiscal

  2. OREM Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Oak Ridge Office of Environmental Management's Program Plan discusses the vision, goals, and strategy for 2014-2024.

  3. EERE Strategic Plan Briefing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Strategic Plan Briefing 2 EERE Strategic Plan 3 Strategic Plan Input 4 Strategic Plan Implementation 5 A strong and prosperous America, powered by clean, affordable, and secure energy EERE Vision 6 To create and sustain American leadership in the transition to a global clean energy economy EERE Mission 7 EERE Organizational Principles * Economic Prosperity * Affordability * Reduced Environmental Impact * Energy Security * Consumer Choice 8 EERE Five Core Questions * Impact Is this a

  4. Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    extends Community Commitment Plan September 18, 2012 LANS Board of Governors extends Community Commitment Plan The Los Alamos National Security, LLC Board of Governors recently voted to extend its Community Commitment Plan for one year. The plan invests $3 million of the company's management fee each year in regional education, economic development and community giving programs. It is managed by LANL's Community Programs Office and was launched in 2006 when LANS won the prime contract to manage

  5. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  6. Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  7. 2014 Energy Sector Specific Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sector-Specific Plan Energy Sector-Specific Plan 2015 ii Page intentionally left blank Energy Sector-Specific Plan 2015 iii TABLE OF CONTENTS PREFACE ......

  8. planning | OpenEI Community

    Open Energy Info (EERE)

    planning Home Jweers's picture Submitted by Jweers(88) Contributor 27 September, 2012 - 07:53 Detailed Planning Kicks Off planning Skype call this morning to discuss details. More...

  9. Buried Waste Integrated Demonstration Plan. Revision 1

    SciTech Connect (OSTI)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  10. Operating plan FY 1998

    SciTech Connect (OSTI)

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  11. Cybersecurity Capability Maturity Model (C2M2) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program » Cybersecurity Capability Maturity Model (C2M2) Cybersecurity Capability Maturity Model (C2M2) Cybersecurity Capability Maturity Model (C2M2) The C2M2 model, which is designed to be used by any organization to enhance its own cybersecurity capabilities, is publicly available and can be downloaded now. More information is available in the FAQs. For those organizations performing self-assessments, please refer to the C2M2 Facilitators Guide and request a free C2M2 toolkit. The

  12. Performance Evaluation and Measurement Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 4 PEMP ORGANIZATION Fee Determining Official ... Evaluation and Measurement Plan (PEMP) is an award fee plan containing both ...

  13. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2015 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  14. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory-Directed Research and Development Program FY2016 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2016 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including

  15. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2014 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  16. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  17. DOE Retro Analysis Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for

  18. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Protection » Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements between the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public Involvement PO Box 1663, MS M996 Los Alamos, NM 87544 (505) 667-0216 Email We welcome your comments and suggestions on how

  19. Plan Design Highlights for:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LEGAL NOTICES: Access federal and state legal notices related to your plan: deltadentalins.com/about/legal/index-enrollee.html 1 In Texas, Delta Dental Insurance Company offers a Dental Provider Organization (DPO) plan. 2 Enrollees are responsible for any coinsurance, deductible, amount over the plan maximum and charges for non-covered services. 3 Verify that your dentist is a contracted Delta Dental PPO network dentist before each appointment. 4 Applies only to procedures covered under your

  20. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Relations Plan Community Relations Plan The Laboratory maintains an open working relationship with communities and interested members of the public. August 1, 2013 Guests listen to Lab historian Ellen McGhee on tour of historical sites Guests listen to Laboratory historian Ellen McGhee on a tour of historical sites. What the plan does Establishes a productive government-to-government relationship with local tribes and pueblos Keeps communities and interested members of the public

  1. Training Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for system/software development and installation Training Plan (63.82 KB) More Documents & Publications System Design Transition Plan Conversion Plan

  2. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydroelectric Reciprocating Internal Combustion Engine Fossil Fuel Turbines Alaska Energy Statistics, 2011 4 Energy Costs Vary 5 Regional Energy Planning * Energy Pathways led to ...

  3. planning for emergencies

    National Nuclear Security Administration (NNSA)

    1%2A en Planning for Emergencies http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismplanningforemergencies

  4. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    436.1 SITE SUSTAINABILITY PLAN Princeton Plasma Physics Laboratory PPPL is operated by ... Laboratory Director, Operations Princeton Plasma Physics Laboratory December 2014 FY 2015 ...

  5. State Energy Strategic Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

  6. BPA Energy Efficiency Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA Energy Efficiency Plan Pages default Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE...

  7. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AEA is an independent and public corporation of the State of Alaska Created by ... for final draft development and interface with AkAES 7 Alaska's Energy Plans ...

  8. Site Sustainability Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Regional and Local Planning ......10.2 Emergency Response Procedures and ... the prospects and problems of post-remediation care ...

  9. DOE CONTRACTOR PENSION PLANS

    Energy Savers [EERE]

    Contractor's workforce and sponsors the employee pension and benefit plans; or (b) ... DOE-H-200x EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation ...

  10. DRAFT Bear Safety Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bear Safety Plan June 2010 NSAbspRev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility North Slope of AlaskaAdjacent Arctic Ocean (ACRFNSAAAO) Bear Safety ...

  11. STANDARD REVIEW PLAN

    Office of Environmental Management (EM)

    of Nuclear Facilities Standard Review Plan Safety Design Strategy January 2015 OFFICE OF ENVIRONMENTAL MANAGEMENT ... safety, environment, security, and quality assurance, ...

  12. Visual Sample Plan Flyer

    Office of Energy Efficiency and Renewable Energy (EERE)

    This flyer better explains that VSP is a free, easy-to-use software tool that supports development of optimal sampling plans based on statistical sampling theory.

  13. Long Range Development Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scientific missions. Science drives the Lab's development. LRDPs establish a framework of land-use principles and policies to guide future growth and change through 2025. The plan...

  14. Site Transition Plan Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Guidance Site Transition Plan Guidance Site Transition Plan Guidance PDF icon Site Transition Plan Guidance More Documents & Publications Development of Site Transition Plan, ...

  15. Guidelines for strategic planning

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

  16. Draft 2014 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan (4.52 MB) More Documents & Publications 2011 Annual Plan 2013 Annual Plan Sec. 999 Annual Plan 2012

  17. 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2012 Annual Plan Section 999: 2012 Annual Plan Section 999 - 2012 Annual Plan (3.97 MB) More Documents & Publications 2011 Annual Plan Sec. 999 Annual Plan 2012 2013 Annual Plan

  18. Strategic Energy Planning

    Broader source: Energy.gov [DOE]

    Comprehensive strategic energy planning, whether at the state, local, or tribal level, is a critical building block for sound energy management and for advancing a clean energy economy in your jurisdiction. Use these resources—including step-by-step guides, tools, templates, trends, and examples—to develop a strategic energy plan.

  19. Environmental protection Implementation Plan

    SciTech Connect (OSTI)

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  20. WREP Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electrical Interconnection of the Whistling Ridge Energy Project 1 Mitigation Action Plan June 2015 Mitigation Action Plan for the Whistling Ridge Energy Project Measure Implementation Timeline Implementation Responsibility Earth (geology, soils, topography, and geologic hazards) Prior to Project construction, confirm subsurface soil and rock types and strength properties through a detailed geotechnical investigation of the specific locations of all wind Project elements, including wind

  1. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  2. Transmission Planning Analysis Tool

    SciTech Connect (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.

  3. Study plan for critical renewable energy storage technology (CREST)

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Now is the time to plan to integrate significant quantities of distributed renewable energy into the electricity grid. Concerns about climate change, the adoption of state-level renewable portfolio standards and incentives, and accelerated cost reductions are driving steep growth in U.S. renewable energy technologies. The number of distributed solar photovoltaic (PV) installations and wind farms are growing rapidly. The potential for concentrated solar power (CSP) also continues to grow. As renewable energy technologies mature, they can provide a significant share of our nations electricity requirements.

  4. Tank waste remediation system systems engineering management plan

    SciTech Connect (OSTI)

    Peck, L.G.

    1996-02-06

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

  5. The Sellafield Plan - 12458

    SciTech Connect (OSTI)

    Irving, Iain

    2012-07-01

    The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear

  6. ACQUISITION PLANNING | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications 7pt1AcquisitionPlanning.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Update of Acquisition Guide Chapter 7.1, Acquisition Planning

    ACQUISITION PLANNING (742.74 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2015-13

  7. EMSL Strategic Plan 2008

    SciTech Connect (OSTI)

    Campbell, Allison A.

    2008-08-15

    This Strategic Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

  8. ES H action plan

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  9. EMSL Contribution Plan

    SciTech Connect (OSTI)

    Campbell, Allison A.

    2008-12-01

    This Contribution Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSL’s workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSL’s long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2

  10. Operational Area Monitoring Plan

    Office of Legacy Management (LM)

    ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan

  11. Environmental monitoring plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  12. Standard Review Plan Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the

  13. Aquisition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Aquisition Plan Aquisition Plan This template is used for documenting the plans for acquiring hardware, software and communications equipment for a systems development project. Aquisition Plan (51.82 KB) More Documents & Publications Feasibility Study Report Template System Design Training Plan

  14. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect (OSTI)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  15. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R. C.

    1998-06-01

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  16. Technical Planning Basis

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11

    The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Supersedes DOE G 151.1-1, Volume 2.

  17. Community Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    path to achieve your desired energy future * Clarifies key performance indicators * Documents the game plan for short- and long-term success 3 And what does it do for you? vs. ...

  18. Draft Closure Plan

    Office of Environmental Management (EM)

    ATTACHMENT G.15 TECHNICAL AREA 54, AREA L OUTDOOR CONTAINER STORAGE UNIT CLOSURE PLAN Los Alamos National Laboratory Hazardous Waste Permit December 2014 TABLE OF CONTENTS LIST OF TABLES ....................................................................................................................................... iv LIST OF FIGURES ..................................................................................................................................... v 1.0 INTRODUCTION

  19. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for ... . . . . . . . . 1-1 1.3 Sources of Ground-Water Contamination from Milling Operations . . ...

  20. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DECEMBER 2014 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER ... within the context of an integrated system of capture, transport, and storage ...

  1. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  2. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    ... Example 23 6.0 Project Execution 6.01 Work Specification and Planning with Safety ... All work will incorporate the core principles of Integrated Safety Management. 6.01.02 ...

  3. Planning for the future

    SciTech Connect (OSTI)

    Lesh, Pamela

    2009-06-15

    Four changes to integrated resource planning could significantly improve alignment between future utility spending and the forces and changes that are upending past preconceptions of how to predict future load. (author)

  4. SNL Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... of concern CRP Community Relations Plan DOD U.S. Department of Defense DOE U.S. ... Tours DOE and the Department of Defense (DOD) provide information about ongoing ...

  5. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  6. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  7. PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples

    Office of Environmental Management (EM)

    Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below ...

  8. Report: Strategic Planning Impacts

    Office of Environmental Management (EM)

    Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM

  9. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  10. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP)

  11. Career Planning - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    banner-career-planning Career Planning for the Nuclear Industry Some people are surprised to learn just how many types of careers exist in the nuclear industry. From construction of nuclear facilities to operation, maintenance and research, many types of skills are needed in Professional, Technician, Engineer and Craft categories. To see types of nuclear industry jobs, click here. To see descriptions of nuclear industry jobs, click here. Whether you are considering a career change or just

  12. Environmental implementation plan

    SciTech Connect (OSTI)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  13. TWRS safety management plan

    SciTech Connect (OSTI)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  14. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 DOE ORDER 436.1 SITE SUSTAINABILITY PLAN Princeton Plasma Physics Laboratory PPPL is operated by Princeton University for the U.S. Department of Energy under contract DE-AC02-09CH1 PLAN APPROVAL Robert S. Sheneman Deputy Head Environment, Safety, Health & Security Department Michael Viola Head, Facilities & Site Services Division Jerry D. Levine Head, Environment, Safety, Health & Security Department William B. Davis Head, Information Technology Department, CIO Michael D. Williams

  15. Update on Franklin retirement plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update on Franklin retirement plans Update on Franklin retirement plans February 21, 2012 by Helen He NERSC is making progress on plans to acquire our next major system. Franklin's...

  16. System Plan Revision 5 + 6

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Revision 7 General Overview DaBrisha Smith (DOEORP) April 10, 2013 System Plan 101 * What is System Planning - A process used by organizations to design, analyze and define ...

  17. Workforce Plans | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Workforce Planning is an integral part of the human capital planning process. The intent ... The purpose of the workforce Plan is to provide focus and direction to Human Resources ...

  18. Transition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transition Plan Transition Plan This template is used to define the objectives, resources, and plans for systems transition, e.g., scheduling the transition from acceptance testing to full operational status, identifying staffing and training needs for system operation and maintenance, planning for data migration, etc Transition Plan (35.86 KB) More Documents & Publications System Design Feasibility Study Report Template Configuration Management Plan

  19. Performance Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plans Performance Plans November 13, 2015 Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan November 6, 2014 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan December 13,

  20. Rulison Monitoring Plan

    SciTech Connect (OSTI)

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides

  1. 2011 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2011 Annual Plan Section 999: 2011 Annual Plan Section 999: 2011 Annual Plan (5.47 MB) More Documents & Publications Recommendations: Draft 2008 Section 999 Annual Plan Sec. 999 Annual Plan 2012 UDAC Meeting - February 2011

  2. ARM - Lesson Plans: Air Pressure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teachers' Toolbox Lesson Plans Lesson Plans: Air Pressure Objective The objective of this ... Important Points to Understand Air has weight and exerts pressure on everything with which ...

  3. 2016 Plan Options for Retirees

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Options 2016 Plan Options for Retirees Information for LANS retirees Contacts Retiree Insurance Providers Non-Medicare retirees HDHP plan highlights (pdf) HDHP summary of benefits...

  4. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan - Other plans (SiteFacilities, WFD, etc) * Execute--perform technical & business functions - Management systems (CAS) * Check--measureanalyze & evaluate...

  5. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education ...

  6. Soboba Strategic Tribal Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    all tribal members past, present, and future. - Clean Water ... - The Final Strategic Energy Planning document ... work on an approved 12 month project implementation plan. ...

  7. NUGEX 2014 Meeting Planning Subcommittee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Meeting Planning Subcommittee NUGEX 2014 Meeting Planning Subcommittee Members Frank Tsung, UCLA (HEPFES) Gary Grest, Sandia (BES) Last edited: 2013-06-03 11:04:4...

  8. Realistic Financial Planning and Rapid

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Realistic Financial Planning and Rapid Modification to Project Execution are Essential ... Ignition Facility Title: Realistic Financial Planning and Rapid Modification to ...

  9. Significance of Isotopically Labile Organic Hydrogen in Thermal Maturation of Organic Matter

    SciTech Connect (OSTI)

    Arndt Schimmelmann; Maria Mastalerz

    2010-03-30

    Isotopically labile organic hydrogen in fossil fuels occupies chemical positions that participate in isotopic exchange and in chemical reactions during thermal maturation from kerogen to bitumen, oil and gas. Carbon-bound organic hydrogen is isotopically far less exchangeable than hydrogen bound to nitrogen, oxygen, or sulfur. We explore why organic hydrogen isotope ratios express a relationship with organic nitrogen isotope ratios in kerogen at low to moderate maturity. We develop and apply new techniques to utilize organic D/H ratios in organic matter fractions and on a molecular level as tools for exploration for fossil fuels and for paleoenvironmental research. The scope of our samples includes naturally and artificially matured substrates, such as coal, shale, oil and gas.

  10. Federal Building Metering Implementation Plan Template | Department...

    Office of Environmental Management (EM)

    Implementation Plan Template Federal Building Metering Implementation Plan Template Document provides a template for a federal building metering implementation plan....

  11. WIPP - Passive Institutional Controls (PICs) Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Plans Files below are in PDF format and can be viewed with Adobe Acrobat Reader. PICs Implementation Plan Permanent Markers Implementation Plan Permanent Markers Testing Plan

  12. Appendix K Disposal Cell Groundwater Monitoring Plan

    Office of Legacy Management (LM)

    K Disposal Cell Groundwater Monitoring Plan

  13. Strategic Energy Planning Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning Resources Strategic Energy Planning Resources Below are resources for Tribes on strategic energy planning. Learn more about strategic energy planning. ...

  14. Creating Sample Plans

    Energy Science and Technology Software Center (OSTI)

    1999-03-24

    The program has been designed to increase the accuracy and reduce the preparation time for completing sampling plans. It consists of our files 1. Analyte/Combination (AnalCombo) A list of analytes and combinations of analytes that can be requested of the onsite and offsite labs. Whenever a specific combination of analytes or suite names appear on the same line as the code number, this indicates that one sample can be placed in one bottle to bemore » analyzed for these paremeters. A code number is assigned for each analyte and combination of analytes. 2. Sampling Plans Database (SPDb) A database that contains all of the analytes and combinations of analytes along with the basic information required for preparing a sample plan. That basic information includes the following fields; matrix, hold time, preservation, sample volume, container size, if the bottle caps are taped, acceptable choices. 3. Sampling plans create (SPcreate) a file that will lookup information from the Sampling Plans Database and the Job Log File (JLF98) A major database used by Sample Managemnet Services for recording more than 100 fields of information.« less

  15. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  16. Optics Supply Planning System

    SciTech Connect (OSTI)

    Gaylord, J

    2009-04-30

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  17. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

  18. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  19. LANS DB PENSION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANS Contract LANS Contract Information Management and Operating Contract for the Los Alamos National Laboratory For confirmation of Official Contract Provisions, call: Dan Saiz, Contract Specialist, M&O Contract Support Division at (505) 845-4024. Get Adobe Reader You will need Adobe Acrobat to read many of the files on this site. If you haven't already done so, please download the free Adobe Reader

    December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS

  20. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  1. Guam Strategic Energy Plan

    SciTech Connect (OSTI)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  2. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5-16 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  3. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    01-13 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  4. Performance expectation plan

    SciTech Connect (OSTI)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  5. Environmental protection implementation plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

  6. Mescalero Apache Strategic Energy Plan

    Broader source: Energy.gov [DOE]

    Example of a tribal community strategic energy plan developed by the Mescalero Apache. Source: Kabotie Consulting.

  7. Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

    SciTech Connect (OSTI)

    Nelson, J. G.; R., L. Morton; Ramirez, C.; Morris, P. S.; McSwain, J. T.

    2011-02-02

    Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant “looking back” instead of “looking forward.” In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

  8. AmeriFlux CA-Qfo Quebec - Eastern Boreal, Mature Black Spruce

    SciTech Connect (OSTI)

    Margolis, Hank A.

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site CA-Qfo Quebec - Eastern Boreal, Mature Black Spruce. Site Description - 49.69247° N / 74.34204° W, elevation of 387 mm, 90 - 100 yr old Black Spruce, Jack Pine, feather moss

  9. Variation in age and size at maturity of the slider turtle (Pseudemys scripta)

    SciTech Connect (OSTI)

    Gibbons, J.W.; Semlitch, R.D.; Greene, J.L.; Schubauer, J.P.

    1981-01-01

    The adaptive strategy of the slider turtle, Pseudemys scripta, in terms of age and size at sexual maturity is discussed. Populations from a natural aquatic habitat and from a cooling reservoir on the US DOE Savannah River Plant are compared. (HCR)

  10. Program Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications » Program Plans Program Plans This page contains summaries of planned activities for DOE's Fuel Cell Technologies Office. The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Office and the DOE offices of Nuclear Energy, Fossil Energy, and Science. It describes the Program's activities, the specific

  11. Comprehensive facilities plan

    SciTech Connect (OSTI)

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  12. Occupant Emergency Plans

    Broader source: Energy.gov [DOE]

    The collection of Emergency Procedures documents for the Department of Energy, Headquarters buildings, in the Washington, DC, metropolitan area. All of these documents are only available to computers attached to the DOE Network. They are for use only by DOE Headquarters employees. • Building Diagrams and Assembly Areas • Occupant Emergency Plans (OEP's)

  13. Aerocapacitor commercialization plan

    SciTech Connect (OSTI)

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  14. Planning cogeneration systems

    SciTech Connect (OSTI)

    Limaye, D.

    1984-01-01

    Major factors and considerations in the planning and evaluation of cogeneration systems are explained here. Coverage is provided of prefeasibility assessment, technical and economic feasibility evaluation, computerized systems design, cogeneration technologies and applications, and non-conventional technologies. Also discussed are fuel availability and price trends, financing and risk management in cogeneration projects, and practical considerations in cogeneration implementation.

  15. PNNL Campus Master Plan

    SciTech Connect (OSTI)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  16. Designing a Benchmarking Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    U.S. Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Program (WIP) Solution Center document about how state and local governments, Indian tribes, and overseas U.S. territories can design a plan to benchmark the energy consumption in public buildings.

  17. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  18. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  19. Involuntary Separation Plan Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Template Involuntary Separation Plan Template Attachment 6 - Involuntary Separation Plan Template_Rev1 (69.15 KB) More Documents & Publications Workforce Restructuring Policy General Workforce Restructuring Plan Template Self-Select Voluntary Separation Plan Template

  20. Section 999: Annual Plans | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    September 10, 2013 Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan July 8, 2013 2013 Annual Plan Section 999: 2013 Annual Plan August 3, 2012 2012 Annual Plan Section ...

  1. Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The 2006 Hydrogen Posture Plan satisfies Section 804 of the Energy Policy Act of 2005, which requires that the Secretary of Energy transmit to Congress a coordinated plan for the Department’s hydrogen and fuel cell programs.

  2. SAVEnergy Action Plans

    SciTech Connect (OSTI)

    Mayo, K.; Westby, R.; deMonsabert, S.; Ginsberg, M.

    1994-04-01

    The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

  3. CIPS Validation Data Plan

    SciTech Connect (OSTI)

    Nam Dinh

    2012-03-01

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  4. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  5. Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . December 2006 Hydrogen Hydrogen P P osture osture Plan Plan An An Integrated Integrated R R esearch, esearch, Development Development and and Demonstration Demonstration Plan Plan United States Department of Energy United States Department of Transportation A National Commitment In his 2003 State of the Union address, President Bush announced a hydrogen initiative to reverse America's growing dependence on foreign oil and improve the environment. The President urged the development of

  6. Plan Your Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visit Plan your visit to the museum Experience 40 interactive exhibits revealing nuclear defense history and the research in life sciences, material sciences, space, supercomputing, energy and the environment. August 18, 2014 Visitor in an interactive exhibit Contact Us thumbnail of Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Free Admission Bradbury Science Museum, 1350 Central Avenue Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Free Admission Open every day except Thanksgiving, Christmas, and New

  7. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field

  8. SNL Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RESOURCE CONSERVATION AND RECOVERY ACT FACILITY OPERATING PERMIT COMMUNITY RELATIONS PLAN SANDIA NATIONAL LABORATORIES, NEW MEXICO AUGUST 2015 United States Department of Energy National Nuclear Security Administration Sandia Field Office Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract

  9. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that

  10. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CARBON CAPTURE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its

  11. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents

  12. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use

  13. Future land use plan

    SciTech Connect (OSTI)

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  14. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  15. TRUPACT-1 implementation plan

    SciTech Connect (OSTI)

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  16. Peru-Planning for Climate Change (PlanCC) | Open Energy Information

    Open Energy Info (EERE)

    Peru-Planning for Climate Change (PlanCC) (Redirected from Planning for Climate Change (PlanCC) Peru) Jump to: navigation, search Logo: Planning for Climate Change (PlanCC) Peru...

  17. Unvented Drum Handling Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    2000-08-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  18. Preferred Provider Organization (PPO) Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preferred Provider Organization (PPO) Plan for non-Medicare retirees is a medical insurance plan with a lower deductible but higher premium than the 2016 High-Deductible Health...

  19. OpenEI Community - planning

    Open Energy Info (EERE)

    coming soon

    http:en.openei.orgcommunityblogdetailed-planning-kickscomments planning Linked Open Data Workshop in Washington, D.C. Thu, 27 Sep 2012 13:53:37 +0000 Jweers...

  20. Strategic Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is divided into two main phases. In the scientific plan phase we developed a new vision for our scientific and technology research. Plans for focus areas have been developed...

  1. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Environmental Management (EM)

    the recently completed Electricity Subsector Cybersecurity Capability Maturity Model. ... Richard Reed, Vice President of Preparedness and Resilience Strategy for the American Red ...

  2. Accidental Death & Dismemberment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accidental Death & Dismemberment Plan Accidental Death & Dismemberment Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Accidental Death & Dismemberment Plan Accidental Death and Dismemberment (AD&D) insurance protects you and your family from the unforeseen financial hardship of an accident that causes death, dismemberment, paralysis, or loss of

  3. Planning | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    planning and training to counter both domestic and international nuclear terrorism. ... PROGRAMMATIC ("ongoing" activities) Program Administration Training and Drills Exercises ...

  4. Storm Water Pollution Prevention Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ANL-1520 Storm Water Pollution Prevention Plan Argonne National Laboratory FY 2015 ...... Peter L. Lynch Water Pollution Control Specialist FMS - ...

  5. STRIPES New Milestone Plan Process

    Broader source: Energy.gov [DOE]

    A new Milestone Plan process has been implemented in STRIPES. Creating a Milestone Plan document and linking it to a requisition or award is no longer a system requirement. Instead, four fields have been added to the Main | Additional pages of all award documents (except P-Card Orders). These fields will be used to capture the PALT data required by management and will replace the function previously performed by the Milestone Plan. (See the attached Milestone Plan Process Improvement Reference Guide.)

  6. AmeriFlux US-Wi4 Mature red pine (MRP)

    SciTech Connect (OSTI)

    Chen, Jiquan

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-Wi4 Mature red pine (MRP). Site Description - The Wisconsin Mature Red Pine site is located in the Washburn Ranger District of the northeastern section of Chequamegon National Forest. A member of the northern coniferous-deciduous biome, surveys from the mid-19th century indicate the region consisted of a mixed stand of red, white, and jack pines. After extensive timber harvesting, wildfires, and farming activity, the region turned into a fragmented mosaic of stands of various ages and composition. As an assemblage, the ten Wisconsin sites are indicative of the successional stages of development in the predominant stand types of a physically homogeneous landscape. Thinned every 7 years until they reach 100 to 150 years of age, the red pine plantations of all ages occupy approximately 25% of the region.

  7. Lopatin Analysis of maturation and petroleum generation in the Illinois basin

    SciTech Connect (OSTI)

    Cluff, R.M. ); Byrnes, A.P. )

    1991-08-01

    A modified Lopatin approach was used to evaluate the present-day maturity of Paleozoic source rock units across the Illinois basin, timing of generation, regional porosity trends, and basin paleostructure during major generative events. Ten cases were modeled at 100 locations to test assumed paleogeothermal gradients, post-Pennsylvanian overburden thicknesses, and rates of erosional stripping. Lopatin predicted maturities for the Herrin ({number sign}6) Coal and the New Albany Shale are in good agreement ({plus minus}0.02% R{sub O}) with measured maturities if 500-3,000 ft of post-Middle Pennsylvanian strata and were deposited and subsequently eroded between the Permian and mid-Cretaceous and if paleogeothermal gradients were within a few {degree}C/km of present-day gradients. Predicted mean reflectance levels range from 1.0 to 4.0% R{sub O} at the base of the Potsdam Megagroup, 0.7 to 3.5% at the base of the Know Megagroup, and 0.6 to 1.3% at the base of the Maquoketa Shale, excluding only a small high-maturity area in southeastern Illinois. The Knox and Potsdam section attained oil generation 475-300 Ma, while the Maquoketa and the younger New Albany Shale reached the oil window much later: 300-250 Ma. Because most significant structures in the basin formed after 300 Ma, any pre-Maquoketa source rocks were already within the gas zone and may have been largely spent by the time known structures formed. Any Know or deeper traps in the basin will probably contain gas, be restricted to old structures (earlier than 300 Ma) or stratigraphic traps, and will hold pre-300 Ma generated hydrocarbons which subsequently cracked to gas.

  8. Clean Energy Business Plan Competition

    ScienceCinema (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

    2013-05-29

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  9. Clean Energy Business Plan Competition

    SciTech Connect (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv

    2012-01-01

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  10. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    SciTech Connect (OSTI)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

  11. Transportation Energy Futures Series. Projected Biomass Utilization for Fuels and Power in a Mature Market

    SciTech Connect (OSTI)

    Ruth, M.; Mai, T.; Newes, E.; Aden, A.; Warner, E.; Uriarte, C.; Inman, D.; Simpkins, T.; Argo, A.

    2013-03-01

    The viability of biomass as transportation fuel depends upon the allocation of limited resources for fuel, power, and products. By focusing on mature markets, this report identifies how biomass is projected to be most economically used in the long term and the implications for greenhouse gas (GHG) emissions and petroleum use. In order to better understand competition for biomass between these markets and the potential for biofuel as a market-scale alternative to petroleum-based fuels, this report presents results of a micro-economic analysis conducted using the Biomass Allocation and Supply Equilibrium (BASE) modeling tool. The findings indicate that biofuels can outcompete biopower for feedstocks in mature markets if research and development targets are met. The BASE tool was developed for this project to analyze the impact of multiple biomass demand areas on mature energy markets. The model includes domestic supply curves for lignocellulosic biomass resources, corn for ethanol and butanol production, soybeans for biodiesel, and algae for diesel. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency project initiated to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

  12. Maturation Pathway from Germline to Broad HIV-1 Neutralizer of a CD4-Mimic Antibody

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Bonsignori, Mattia; Zhou, Tongqing; Sheng, Zizhang; Chen, Lei; Gao, Feng; Joyce, M.  Gordon; Ozorowski, Gabriel; Chuang, Gwo-Yu; Schramm, Chaim A.; Wiehe, Kevin; et al

    2016-04-01

    Here, we report that antibodies with ontogenies from VH1-2 or VH1-46-germline genes dominate the broadly neutralizing response against the CD4-binding site (CD4bs) on HIV-1. We define with longitudinal sampling from time-of-infection the development of a VH1-46-derived antibody lineage that matured to neutralize 90% of HIV-1 isolates. Structures of lineage antibodies CH235 (week 41 from time-of-infection, 18% breadth), CH235.9 (week 152, 77%), and CH235.12 (week 323, 90%) demonstrated the maturing epitope to focus on the conformationally invariant portion of the CD4bs. Similarities between CH235 lineage and five unrelated CD4bs lineages in epitope focusing, length-of-time to develop breadth, and extraordinary level ofmore » somatic hypermutation suggested commonalities in maturation among all CD4bs antibodies. Fortunately, the required CH235-lineage hypermutation appeared substantially guided by the intrinsic mutability of the VH1-46 gene, which closely resembled VH1-2. Lastly, we integrated our CH235-lineage findings with a second broadly neutralizing lineage and HIV-1 co-evolution to suggest a vaccination strategy for inducing both lineages.« less

  13. Transportation Energy Futures Series: Projected Biomass Utilization for Fuels and Power in a Mature Market

    SciTech Connect (OSTI)

    Ruth, M.; Mai, T.; Newes, E.; Aden, A.; Warner, E.; Uriarte, C.; Inman, D.; Simpkins, T.; Argo, A.

    2013-03-01

    The viability of biomass as transportation fuel depends upon the allocation of limited resources for fuel, power, and products. By focusing on mature markets, this report identifies how biomass is projected to be most economically used in the long term and the implications for greenhouse gas (GHG) emissions and petroleum use. In order to better understand competition for biomass between these markets and the potential for biofuel as a market-scale alternative to petroleum-based fuels, this report presents results of a micro-economic analysis conducted using the Biomass Allocation and Supply Equilibrium (BASE) modeling tool. The findings indicate that biofuels can outcompete biopower for feedstocks in mature markets if research and development targets are met. The BASE tool was developed for this project to analyze the impact of multiple biomass demand areas on mature energy markets. The model includes domestic supply curves for lignocellulosic biomass resources, corn for ethanol and butanol production, soybeans for biodiesel, and algae for diesel. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency project initiated to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

  14. CESP Planning Timeline Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Timeline Template CESP Planning Timeline Template Tool 0.1: CESP Planning Timeline Template in the Guide to Community Energy Strategic Planning. CESP Planning Timeline Template (11.68 KB) More Documents & Publications Tool 0.1: CESP Planning Worksheet CESP Tool 2.2: Stakeholder Invite Guide to Community Energy Strategic Planning

  15. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  16. Integrated rural energy planning

    SciTech Connect (OSTI)

    El Mahgary, Y.; Biswas, A.K.

    1985-01-01

    This book presents papers on integrated community energy systems in developing countries. Topics considered include an integrated rural energy system in Sri Lanka, rural energy systems in Indonesia, integrated rural food-energy systems and technology diffusion in India, bringing energy to the rural sector in the Philippines, the development of a new energy village in China, the Niaga Wolof experimental rural energy center, designing a model rural energy system for Nigeria, the Basaisa village integrated field project, a rural energy project in Tanzania, rural energy development in Columbia, and guidelines for the planning, development and operation of integrated rural energy projects.

  17. Proj. Plan Example SEM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE) CUSTOMER INFORMATION TECHNOLOGY (IT) SUPPORT SYSTEM (CITSS) Project Plan December 1997 U. S. DEPARTMENT OF ENERGY Office of the Chief Information Officer and Headquarters Collaboration Group Change Control Page The change control page will be used to record information for controlling and tracking modifications made to this document. Revision Date: 12/15/97 Author: Brian Field a. Section(s): 2.3 Page Number(s): 2-2 through 2-4 Summary of Change(s): Updated roles and responsibilities chart

  18. LASIC Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Layered Atlantic Smoke Interactions with Clouds (LASIC) Science Plan P Zuidema MJ Alvarado C Chiu SP DeSzoeke CW Fairall G Feingold SJ Ghan JM Haywood P Kollias ER Lewis GM McFarguhar A McComiskey DB Mechem J Redemann DM Romps DD Turner H Wang R Wood SE Yuter P Zhu March 2016 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes

  19. 2007 Strategic Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy Office of Legacy Management Office of Legacy Management Strategic Plan O r g a n i z a t i o n O r g a n i z a t i o n A H i g h Perfo r m i n g A H i g h Perfo r m i n g HPO Managing Today's Change, Protecting Tomorrow's Future Managing Today's Change, Protecting Tomorrow's Future DOE/LM-1458 Cover, left to right, top to bottom: The Environmental Justice program affords learning opportunities for interns at an U.S. Department of Energy national laboratory. A records

  20. FY16-FY20 Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Performance Evaluation Measurement Plan (PEMP), which is aligned with our strategic plan. ... Vision, as well as with Sandia's Strategic Performance Evaluation Measurement Plan (PEMP). ...

  1. Best Management Practice #1: Water Management Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  2. Strategic Planning Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Planning Overview Strategic Planning Overview BETO Strategic Planning Overview July 2013 programmanagementreview2013strategicplanningeng.pdf (1.29 MB) More Documents ...

  3. Plans and Reports | Department of Energy

    Office of Environmental Management (EM)

    Plans and Reports Plans and Reports The U.S. Department of Energy (DOE) Sustainability Performance Office (SPO) tracks, plans, and reports progress on sustainability metrics set by...

  4. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the ...

  5. Marketing and Communications Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications Plan Marketing and Communications Plan This is a document from Energy ... PDF icon Marketing and Communications Plan More Documents & Publications Sonoma County ...

  6. Project Management Plan Examples | Department of Energy

    Office of Environmental Management (EM)

    Examples Project Management Plan Examples Examples From Project Management Plans The following material has been extracted from several project management plans. The order in which ...

  7. Program Planning Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Guide Program Planning Guide SEP program planning guide.pdf More Documents & Publications SEP Presentations Materials SEP Toolkit Overview The Cummins Rocky Mount...

  8. EERE Digital Data Management Planning Requirements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    To integrate data management planning into an overall research plan, the following ... All projects selected for EERE research funding must include a data management plan (DMP) ...

  9. Annual Planning Summaries: 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the ... March 25, 2013 2013 Annual Planning Summary for the Pacific Northwest Site Office The ...

  10. Strategic plan for infrastructure optimization

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-05-27

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructure and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.

  11. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  12. NIF Title III engineering plan

    SciTech Connect (OSTI)

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  13. Production Planning Model

    Energy Science and Technology Software Center (OSTI)

    1998-04-20

    PRODMOD is an integrated computational tool for performing dynamic simulation and optimization for the entire high level waste complex at the Savannah River Site (SRS) It is being used at SRS for planning purposes so that all waste can be processed efficiently. The computational tool 1) optimizes waste blending sequences, 2) minimizes waste volume production, 3) reduces waste processing time, 4) provides better process control and understanding, and 5) assists strategic planning, scheduling, and costmore » estimation. PRODMOD has been developed using Aspen Technology''s software development package SPEEDUP. PRODMOD models all the key HLW processing operations at SRS: storage and evaporation: saltcake production and dissolution: filtration (dewatering): precipitation: sludge and precipitate washing: glass, grout, and organics production. Innovative approaches have been used in making PRODMOD a very fast computational tool. These innovative approaches are 1) constructing a dynamic problem as a steady state problem 2) mapping between event-space (batch processes) and time-space (dynamic processes) without sacrificing the details in the batch process. The dynamic nature of the problem is constructed in linear form where time dependence is implicit. The linear constructs and mapping algorithms have made it possible to devise a general purpose optimization scheme which couples the optimization driver with the PRODMOD simulator. The optimization scheme is capable of generating single or multiple optimal input conditions for different types of objective functions over single or multiple years of operations depending on the nature of the objective function and operating constraints.« less

  14. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  15. Institutional Plan FY 2003 - 2007

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and

  16. Alternative D and D Planning Tool - 12466

    SciTech Connect (OSTI)

    Starling, D.A.; Schubert, A.L.; Bergener, T.W.

    2012-07-01

    , and the development team's collaboration, specifically, is most important. Building-in this integrity up-front, transparently, will help ensure that the model outputs are known, understood, and credible (no mysterious 'black-box' components). The Waste Factory Model is envisioned to help improve understanding of a given project's waste implications; help reveal and suggest the important few variables out of the trivial many; reveal likely process bottlenecks, and help focus risk mitigation and assumption management efforts to better manage the projected total cost. In the long term, the UCOR team's goal is to incorporate an information feedback loop to help improve the accuracy of key model attributes, such as the standardized cost information. This way, by design, the model output should improve over time and thus help the model mature into both a credible scenario tool and a standardized project planning resource. The initial model capabilities may be narrow, but with time and effort it may prove to be a timely and cost-effective tool. (authors)

  17. Planning for Energy Development: Strategic Energy Planning REnewable...

    Broader source: Energy.gov (indexed) [DOE]

    November 18, 2011 Strategic Energy Planning Renewable Energy Demonstration Center Concept ... sources Could a Renewable Energy Demonstration Center (REDC) attract renewable energy ...

  18. Graphite Technology Development Plan

    SciTech Connect (OSTI)

    W. Windes; T. Burchell; M.Carroll

    2010-10-01

    The Next Generation Nuclear Plant (NGNP) will be a helium-cooled High Temperature Gas Reactor (HTGR) with a large graphite core. Graphite physically contains the fuel and comprises the majority of the core volume. Graphite has been used effectively as a structural and moderator material in both research and commercial high-temperature gas-cooled reactors. This development has resulted in graphite being established as a viable structural material for HTGRs. While the general characteristics necessary for producing nuclear grade graphite are understood, historical nuclear grades no longer exist. New grades must be fabricated, characterized, and irradiated to demonstrate that current grades of graphite exhibit acceptable non-irradiated and irradiated properties upon which the thermomechanical design of the structural graphite in NGNP is based. This Technology Development Plan outlines the research and development (R&D) activities and associated rationale necessary to qualify nuclear grade graphite for use within the NGNP reactor.

  19. GEND planning report

    SciTech Connect (OSTI)

    1980-10-01

    The Three Mile Island (TMI) Unit 2 accident on March 28, 1979 was and is of great concern to the nuclear industry; electric power generating companies and their customers, regulatory and other government agencies, the entire nuclear community, and to the country as a whole. While the accident resulted in only limited external plant radiation exposure, the plant itself suffered extensive damage with high radiation contamination within the reactor and auxiliary system facilities. The GEND Planning Report for cleanup activities at TMI-2 covers the areas of: instrumentation and electrical equipment survivability; fission product transport; decontamination/radiation dose reduction technology; data bank organization and sample archive facility; characterization of primary system pressure boundary and mechanical components; core damage assessment; and fuel handling, removal, examination and disposal.

  20. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  1. A reservoir management plan

    SciTech Connect (OSTI)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  2. National Highway Planning Network

    Energy Science and Technology Software Center (OSTI)

    1992-02-02

    NHPN, the National Highway Planning Network, is a database of major highways in the continental United States that is used for national-level analyses of highway transportation issues that require use of a network, such as studies of highway performance, network design, social and environmental impacts of transportation, vehicle routing and scheduling, and mapping. The network is based on a set of roadways digitized by the U. S. Geological Survey (USGS) from the 1980 National Atlasmore » and has been enhanced with additional roads, attribute detail, and topological error corrections to produce a true analytic network. All data have been derived from or checked against information obtained from state and Federal governmental agencies. Two files comprise this network: one describing links and the other nodes. This release, NHPN1.0, contains 44,960 links and 28,512 nodes representing approximately 380,000 miles of roadway.« less

  3. Recommendations: 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Annual Plan Recommendations: 2007 Annual Plan URTAC Recommendations: Section 999 2007 Annual Plan (296.41 KB) More Documents & Publications Recommendations: 2008 Annual Plan URTAC Meeting - March 4, 2008 URTAC Meeting - July 2007

  4. Recommendations: 2008 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Annual Plan Recommendations: 2008 Annual Plan URTAC Recommendations: 2008 Annual Plan (803.44 KB) More Documents & Publications Recommendations: 2007 Annual Plan URTAC Meeting - March 4, 2008 URTAC Meeting - October 13, 2010

  5. DOE Vendor Communications Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vendor Communications Plan DOE Vendor Communications Plan Vendor Communication Plan.pdf (172.98 KB) More Documents & Publications DOE Vendor Communication Plan Improving Communication with Industry during the Acquisition Process MEMORANDUM FOR CHIEF ACQUISITION OFFICERS

  6. Ames Laboratory Emergency Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ames Laboratory Emergency Plan Version Number: 14.0 Document Number: Plan 46300.001 Effective Date: 04/2016 File (public): PDF icon Plan 46300.001 Rev14 Emergency Plan

  7. Audit Implementation Design Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Audit Implementation Design Plan Document Number: NA Effective Date: 08

  8. 2010 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 Audit Plan Document Number: NA Effective Date: 06

  9. 2016 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Audit Plan Document Number: NA Effective Date: 12

  10. Resource Planning Guide

    Energy Science and Technology Software Center (OSTI)

    1994-06-30

    RPG1.06 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.06 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level ismore » designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.06 also contains three additional volumes. Getting Started is an introduction to RPG1.06. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility''s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.« less

  11. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

    2005-11-23

    The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the

  12. Ten Year Site Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ten Year Site Plans Ten Year Site Plans A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy's overall strategic plan. It is a comprehensive site-wide plan encompassing the needs of tenant activities. The TYSP is integral to and supports the Department's Planning, Programming, Budgeting, and Evaluation System (PPBES). The TYSP also describes site-specific actions the programs plans in

  13. Space Conditioning Standing Technical Committee Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan ... identified by the Building America Space Conditioning Standing Technical Committee. ...

  14. Heating National Ignition Facility, Realistic Financial Planning...

    Office of Environmental Management (EM)

    National Ignition Facility, Realistic Financial Planning & Rapid Modification Lessons Learned Report Apr 2010 Heating National Ignition Facility, Realistic Financial Planning &...

  15. Budget Performance Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Planning Budget Performance Planning The Office of Budget assists with planning by providing guidance such as the Office of Energy Efficiency and Renewable Energy (EERE) Guidance for Multiyear Program Planning. EERE Guidance for Multiyear Program Planning: Phase II Guidance The Multiyear Program Plan (MYPP) Template provides guidance to EERE programs on developing effective program plans. It provides a general framework for multiyear planning, and includes the rationale for the

  16. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk-based retrieval, IM updatediscussion LAWPSCesium, IM updatediscussion WTP Communication Plan, IM updatediscussion TVAT Implementation Plan Update HOLDING BIN...

  17. CITSS Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CITSS Project Plan CITSS Project Plan The Customer Information Technology Support System (CITSS) Training Plan, from an actual DOE Commercial Off-The-Shelf (COTS) software integration project, can be used as a template to facilitate the creation of the training plan for your particular project. CITSS Project Plan (49.2 KB) More Documents & Publications CITSS Project Plan Software Configuration Management Plan Training Plan

  18. Hoisting & Rigging Lift Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hoisting & Rigging Lift Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 1 of 3 General Information Lift Plan Document # Plan prepared by: Describe the load or items to be lifted: Could the load, if dropped, release hazardous materials or radioactivity? No Yes (describe) Is the load irreplaceable or would it be very costly to replace if damaged? No Yes (describe) Brief description of lift activities (specify if rolling or flipping involved) Equipment

  19. Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Plan Strategic Plan Strategic Plan A modern, reliable, secure, affordable and environmentally sensitive national energy infrastructure is fundamental to our quality of life and energy future. Yet since 1982, growth in peak demand for electricity has exceeded the growth and development of our electric grid. This demand growth will continue due to a growing population; larger homes with burgeoning IT requirements and more elaborate appliances; and the growth of electric vehicles; as well

  20. Strategic Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Buildings » Building America » Strategic Plans Strategic Plans The strategic planning process charts the course for the U.S. Department of Energy (DOE) Building America program's efforts to widely deploy new integrated packages of energy-saving measures in new and existing homes. These living documents give an overview of Building America's research approach to evaluate specific building system options for reliability, cost-effectiveness, and marketability. Here you can learn more

  1. Conduct of operations implementation plan

    SciTech Connect (OSTI)

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  2. Karuk Tribe Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Karuk Tribe Strategic Energy Planning Journey To Success? The 5 P's of Success #1 - Partners Local utility company #2 - Politics! Community Development or Natural Resources? #3 - Plan Do you have one already? What are all of those acronyms? # 4 - Place Reservation Fee status land # 5 - Pfunding Where do we start? In Conclusion * Nothing happens fast! * As you move forward there will be more questions * Having a plan is critical to success * Never be afraid to ask for help * Utilize your partners

  3. 2013 Community Commitment plan approved

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Commitment Plan Approved Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit 2013 Community Commitment plan approved The plan provides funding from LANS' management fee to invest in regional education, economic development, and charitable giving programs. October 1, 2012 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus

  4. Benefits Plan Reports & Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Benefits Plan Reports & Notices Benefits Plan Reports & Notices Employees and retirees are the building blocks of the Lab's success. Our employees get to contribute to the most pressing issues facing the nation.Retiree health and welfare benefits are managed by AonHewitt and Associates. Contact Benefits Office As an employer offering ERISA compliant benefit plans, LANS is required to provide notices and reports to employees throughout the course of the year. Generally, the reports are

  5. Recommendations: 2009 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Annual Plan Recommendations: 2009 Annual Plan URTAC - Recommendations on 2009 Section 999 Annual Plan (4.17 MB) More Documents & Publications Recommendations: Draft 2009 Section 999 Annual Plan Recommendations: 2010 Annual Plan Recommendations: Draft 2010 Section 999 Annual Plan

  6. Recommendations: 2011 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Annual Plan Recommendations: 2011 Annual Plan URTAC - Recommendations on 2011 Section 999 Annual Plan URTAC Recommendations on 2011 Section 999 Annual Plan (594.7 KB) More Documents & Publications URTAC Meeting - December 18, 2013 Recommendations: 2010 Annual Plan Recommendations: Draft 2012 Annual Plan

  7. Project Management Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Project Management Plans (353.99 KB) More Documents & Publications Project Management Plan Examples Project Management Plan Examples 1 - 80 Deactivation Management

  8. 2008 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Annual Plan 2008 Annual Plan Section 999: 2008 Annual Plan (15.58 MB) More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2007 Annual Plan Recommendations: Draft 2008 Section 999 Annual Plan

  9. 2013 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13 Annual Plan 2013 Annual Plan Ultra-Deepwater and Uncoventional Natural Gas and Other Petroleum Resources Research and Development Program Report to Congress, June 2013 Section 999: 2013 Annual Plan (6.52 MB) More Documents & Publications 2011 Annual Plan Draft 2014 Annual Plan Sec. 999 Annual Plan 2012

  10. 2009 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2009 Annual Plan Section 999: 2009 Annual Plan (2.11 MB) More Documents & Publications 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan

  11. 2010 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2010 Annual Plan Section 999: 2010 Annual Plan (4.38 MB) More Documents & Publications 2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2009 Annual Plan

  12. Emergency Readiness Assurance Plans (ERAPs)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

  13. EPA Clean Power Plan Seminar

    Broader source: Energy.gov [DOE]

    The U.S. Environmental Protection Agency (EPA) is hosting an informational seminar addressing the opportunities and challenges presented by EPA's Clean Power Plan.

  14. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Maintain Lab Agenda Prepare ALP Program Execution Plan PEMP PreparationApproval POG Support CAS M-3 Implementation FNAL Enterprise Risk Management...

  15. Update on Franklin retirement plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update on Franklin retirement plans Update on Franklin retirement plans February 21, 2012 by Helen He NERSC is making progress on plans to acquire our next major system. Franklin's retirement is necessary to prepare the machine room for the new system. At this point in our planning we can say that Franklin will retire no sooner than April 30. Additional announcements will be made with more details when a firm date is set. If you are currently only using Franklin you should start migrating to

  16. ISTStrategicPlanFinal.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science at Matters: Integrating Information, Science, and Technology for Prediction Strategic Plan December 2010 Predicting Materials Behavior Situational Awareness Energy Climate...

  17. University of Kansas: Business Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of remote customer's power costs and power quality problems. ... energy need in remote areas and emergency situations. ... better health, family planning, and education services, ...

  18. Performance Evaluation and Measurement Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... including those problems identified in the risk management process, is necessary. ... Central Plateau; for example, port of entry, access control, emergency planning zones, etc. ...

  19. Performance Measurement Plans - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CH2M Contract CH2M Contract Modifications WAI Contract WAI Contract Mods Performance Measurement Plans Email Email Page | Print Print Page |Text Increase Font Size Decrease...

  20. Archive: LANL Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Archive: LANL Community Commitment Plan Our good neighbor pledge: to contribute to quality of life in Northern New Mexico through economic development, excellence in...

  1. Final Draft Strategic Marketing Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-02-01

    The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

  2. FY 1989 Annual Operating Plan

    SciTech Connect (OSTI)

    1988-12-01

    This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE 2005)

  3. ARM - SPARTICUS Planning - Data Plots

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurements SGP Data Plots NASA Data Plots ARM Data Discovery Browse Data Experiment Planning SPARTICUS Proposal Abstract Science Questions Science and Operations (PDF, 1.01M)...

  4. Programs Planning to Do Evaluations

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations, Call Slides and Discussion Summary, August 2, 2012.

  5. EPA The Clean Power Plan

    Office of Environmental Management (EM)

    This means carbon and air pollution are already decreasing, improving public health each and every year. The Clean Power Plan 7 Overview * Sets carbon dioxide emissions performance ...

  6. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

    2006-01-10

    Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001). Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements

  7. Multicriteria optimization informed VMAT planning

    SciTech Connect (OSTI)

    Chen, Huixiao; Craft, David L.; Gierga, David P.

    2014-04-01

    We developed a patient-specific volumetric-modulated arc therapy (VMAT) optimization procedure using dose-volume histogram (DVH) information from multicriteria optimization (MCO) of intensity-modulated radiotherapy (IMRT) plans. The study included 10 patients with prostate cancer undergoing standard fractionation treatment, 10 patients with prostate cancer undergoing hypofractionation treatment, and 5 patients with head/neck cancer. MCO-IMRT plans using 20 and 7 treatment fields were generated for each patient on the RayStation treatment planning system (clinical version 2.5, RaySearch Laboratories, Stockholm, Sweden). The resulting DVH of the 20-field MCO-IMRT plan for each patient was used as the reference DVH, and the extracted point values of the resulting DVH of the MCO-IMRT plan were used as objectives and constraints for VMAT optimization. Weights of objectives or constraints of VMAT optimization or both were further tuned to generate the best match with the reference DVH of the MCO-IMRT plan. The final optimal VMAT plan quality was evaluated by comparison with MCO-IMRT plans based on homogeneity index, conformity number of planning target volume, and organ at risk sparing. The influence of gantry spacing, arc number, and delivery time on VMAT plan quality for different tumor sites was also evaluated. The resulting VMAT plan quality essentially matched the 20-field MCO-IMRT plan but with a shorter delivery time and less monitor units. VMAT plan quality of head/neck cancer cases improved using dual arcs whereas prostate cases did not. VMAT plan quality was improved by fine gantry spacing of 2 for the head/neck cancer cases and the hypofractionation-treated prostate cancer cases but not for the standard fractionationtreated prostate cancer cases. MCO-informed VMAT optimization is a useful and valuable way to generate patient-specific optimal VMAT plans, though modification of the weights of objectives or constraints extracted from resulting DVH of MCO-IMRT or

  8. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    SciTech Connect (OSTI)

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ? Health professionals have limited aspirations for health improvement through the planning system. ? Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ? SEA and HIA currently do not embed health consideration in planning decisions. ? The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  9. Army energy plan

    SciTech Connect (OSTI)

    Not Available

    1980-08-08

    The Army Energy Plan describes the current and projected (to the year 2000) energy situation in which the Department of the Army (DA) must operate and summarizes those actions and programs which have been developed and/or are needed to cope with those conditions. It addresses the Army goals, objectives, policies, and programs for all Army activities. World industrial growth during the past century has been characterized and hastened by the widespread availability of inexpensive energy, primarily petroleum. The Arab oil embargo of 1973 served to drive home a number of points, key among them being that the world's principal oil consumers are not the major oil producers. The Middle East and Africa have an estimated 67 percent of the petroleum reserves while Western Europe and the Western Hemisphere have only 16 percent. By most estimates, these reserves are expected to be exhausted within the next 70 years. In the year following the 1973 oil embargo, prices for petroleum rose threefold, signaling the end of the cheap oil. In the decade of the seventies, the price of imported crude oil has risen from $1.80 per barrel to an exorbitant $30.00 per barrel. The combined threats of exhaustion and high cost mandate the use of alternate sources of energy. The distribution of alternate sources of recoverable oil, such as tar sands and oil shale, favor the Western Hemisphere, but economical recovery techniques have not been developed.

  10. Grout Facilities standby plan

    SciTech Connect (OSTI)

    Claghorn, R.D.; Kison, P.F.; Nunamaker, D.R.; Yoakum, A.K.

    1994-09-29

    This plan defines how the Grout Facilities will be deactivated to meet the intent of the recently renegotiated Tri-Party Agreement (TPA). The TPA calls for the use of the grout process as an emergency option only in the event that tank space is not available to resolve tank safety issues. The availability of new tanks is expected by 1997. Since a grout startup effort would take an estimated two years, a complete termination of the Grout Disposal Program is expected in December 1995. The former Tank Waste Remediation (TWRS) Strategy, adopted in 1988, called for the contents of Hanford`s 28 newer double-shell waste tanks to be separated into high-level radioactive material to be vitrified and disposed of in a geologic repository; low-level wastes were to be sent to the Grout Facility to be made into a cement-like-mixture and poured into underground vaults at Hanford for disposal. The waste in the 149 older single-shell tanks (SST) were to undergo further study and analysis before a disposal decision was made.

  11. Visual Sample Plan

    Energy Science and Technology Software Center (OSTI)

    2007-10-25

    VSP selects the appropriate number and location of environmental samples to ensure that the results of statistical tests performed to provide input to risk decisions have the required confidence and performance. VSP Version 5.0 provides sample-size equations or algorithms needed by specific statistical tests appropriate for specific environmental sampling objectives. It also provides data quality assessment and statistical analysis functions to support evaluation of the data and determine whether the data support decisions regarding sitesmore » suspected of contamination. The easy-to-use program is highly visual and graphic. VSP runs on personal computers with Microsoft Windows operating systems (98, NT, 2000, Millennium Edition, CE, and XP) Designed primarily for project managers and users without expertise in statistics, VSP is applicable to two- and three-dimensional populations to be sampled (e.g., rooms and buildings, surface soil, a defined layer of subsurface soil, water bodies, and other similar applications) for studies of environmental quality. VSP is also applicable for designing sampling plans for assessing chem./rad/bio threat and hazard identification within rooms and buildings, and for designing geophysical surveys for UXO identification.« less

  12. Evaluation of deltamethrin kinetics and dosimetry in the maturing rat using a PBPK model

    SciTech Connect (OSTI)

    Tornero-Velez, Rogelio; Mirfazaelian, Ahmad; Kim, Kyu-Bong; Anand, Sathanandam S.; Kim, Hyo J.; Haines, Wendy T.; Bruckner, James V.; Fisher, Jeffrey W.

    2010-04-15

    Immature rats are more susceptible than adults to the acute neurotoxicity of pyrethroid insecticides like deltamethrin (DLM). A companion kinetics study (Kim et al., in press) revealed that blood and brain levels of the neuroactive parent compound were inversely related to age in rats 10, 21, 40 and 90 days old. The objective of the current study was to modify a physiologically based pharmacokinetic (PBPK) model of DLM disposition in the adult male Sprague-Dawley rat (Mirfazaelian et al., 2006), so blood and target organ dosimetry could be accurately predicted during maturation. Age-specific organ weights and age-dependent changes in the oxidative and hydrolytic clearance of DLM were modeled with a generalized Michaelis-Menten model for growth and the summary equations incorporated into the PBPK model. The model's simulations compared favorably with empirical DLM time-courses in plasma, blood, brain and fat for the four age-groups evaluated (10, 21, 40 and 90 days old). PND 10 pups' area under the 24-h brain concentration time curve (AUC{sub 0-24h}) was 3.8-fold higher than that of the PND 90 adults. Our maturing rat PBPK model allows for updating with age- and chemical-dependent parameters, so pyrethroid dosimetry can be forecast in young and aged individuals. Hence, this model provides a methodology for risk assessors to consider age-specific adjustments to oral Reference Doses on the basis of PK differences.

  13. LDRD FY 2014 Program Plan

    SciTech Connect (OSTI)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  14. FreedomCAR Partnership Plan

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Partnership Plan September 5, 2002 FreedomCAR Partnership Plan ii Table of Contents Section Page I. Executive Summary ...........................................................iii II. Introduction ..............................................................................1 III. Partnership Structure, Responsibilities and Management Process ..........5 IV. Technical Scope and Objectives ..................................................8 V. Milestones and Timing

  15. DOE Emergency Public Affairs Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Office of Public Affairs Emergency Public Affairs Plan The DOE HQ Office of Public Affairs Emergency Public Affairs Plan has been approved for implementation by: __________________________________________________________ Dan Leistikow, Director, HQ Office of Public Affairs Date: ______________ __________________________________________________________ Joseph Krol, Director, HQ Office of Emergency Management Date: ______________ DOE Office of Public Affairs Emergency Public Affairs

  16. Business Plan in Brief : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  17. Archive: LANL Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Archive Archive: LANL Community Commitment Plan Our good neighbor pledge: to contribute to quality of life in Northern New Mexico through economic development, excellence in education, and active employee engagement in our communities. Contact Community Relations & Partnerships (505) 665-4400 Community Commitment Plans 2014 (pdf) 2013

  18. Y-12 Site Sustainability Plan

    SciTech Connect (OSTI)

    none,; Erhart, S C; Spencer, C G

    2013-12-01

    This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  19. Preparation of RCRA contingency plans

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    The purpose of this guidance is to assist Department of Energy (DOE) field personnel in the preparation of Resource Conservation and Recovery Act (RCRA) contingency plans as set forth in 40 CFR 264/265 Subpart D and 270.42. The guidance will assist personnel in evaluating and ensuring facility compliance with the contingency plan requirements.

  20. Technical planning activity: Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  1. FY 1996 annual work plan

    SciTech Connect (OSTI)

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  2. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new

  3. Hopi Sustainable Energy Plan

    SciTech Connect (OSTI)

    Norman Honie, Jr.; Margie Schaff; Mark Hannifan

    2004-08-01

    The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of the Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.

  4. TWRS safety program plan

    SciTech Connect (OSTI)

    Calderon, L.M., Westinghouse Hanford

    1996-08-01

    Management of Nuclear Safety, Industrial Safety, Industrial Hygiene, and Fire Protection programs, functions, and field support resources for Tank Waste Remediation Systems (TWRS) has, until recently, been centralized in TWRS Safety, under the Emergency, Safety, and Quality organization. Industrial hygiene technician services were also provided to support operational needs related to safety basis compliance. Due to WHC decentralization of safety and reengineering efforts in West Tank Farms, staffing and safety responsibilities have been transferred to the facilities. Under the new structure, safety personnel for TWRS are assigned directly to East Tank Farms, West Tank Farms, and a core Safety Group in TWRS Engineering. The Characterization Project Operations (CPO) safety organization will remain in tact as it currently exists. Personnel assigned to East Tank Farms, West Tank Farms, and CPO will perform facility-specific or project-specific duties and provide field implementation of programs. Those assigned to the core group will focus on activities having a TWRS-wide or programmatic focus. Hanford-wide activities will be the responsibility of the Safety Center of Expertise. In order to ensure an effective and consistent safety program for TWRS under the new organization program functions, goals, organizational structure, roles, responsibilities, and path forward must be clearly established. The purpose of the TWRS Safety Program Plan is to define the overall safety program, responsibilities, relationships, and communication linkages for safety personnel under the new structure. In addition, issues associated with reorganization transition are addressed, including training, project ownership, records management, and dissemination of equipment. For the purpose of this document ``TWRS Safety`` refers to all safety professionals and technicians (Industrial Safety, Industrial Hygiene, Fire Protection, and Nuclear Safety) within the TWRS organization, regardless of their

  5. Topic A Awardee: Eastern Interconnection Planning Collaborative |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based,

  6. CITSS Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Plan CITSS Project Plan The Customer Information Technology Support System (CITSS) Project Plan, from an actual DOE Commercial Off-The-Shelf (COTS) software integration project, can be used as a template to facilitate the creation of the project plan for your particular proje CITSS Project Plan (191.42 KB) More Documents & Publications Software Configuration Management Plan CITSS Project Plan CITSS Configurable Item List: COTS Software

  7. Suboptimal inhibition of protease activity in human immunodeficiency virus type 1: Effects on virion morphogenesis and RNA maturation

    SciTech Connect (OSTI)

    Moore, Michael D.; Fu, William; Soheilian, Ferri; Nagashima, Kunio; Ptak, Roger G.; Pathak, Vinay K.; Hu, Wei-Shau

    2008-09-15

    Protease activity within nascently released human immunodeficiency virus type 1 (HIV-1) particles is responsible for the cleavage of the viral polyproteins Gag and Gag-Pol into their constituent parts, which results in the subsequent condensation of the mature conical core surrounding the viral genomic RNA. Concomitant with viral maturation is a conformational change in the packaged viral RNA from a loosely associated dimer into a more thermodynamically stable form. In this study we used suboptimal concentrations of two protease inhibitors, lopinavir and atazanavir, to study their effects on Gag polyprotein processing and on the properties of the RNA in treated virions. Analysis of the treated virions demonstrated that even with high levels of inhibition of viral infectivity (IC{sub 90}), most of the Gag and Gag-Pol polyproteins were processed, although slight but significant increases in processing intermediates of Gag were detected. Drug treatments also caused a significant increase in the proportion of viruses displaying either immature or aberrant mature morphologies. The aberrant mature particles were characterized by an electron-dense region at the viral periphery and an electron-lucent core structure in the viral center, possibly indicating exclusion of the genomic RNA from these viral cores. Intriguingly, drug treatments caused only a slight decrease in overall thermodynamic stability of the viral RNA dimer, suggesting that the dimeric viral RNA was able to mature in the absence of correct core condensation.

  8. Chronic alcohol consumption enhances iNKT cell maturation and activation

    SciTech Connect (OSTI)

    Zhang, Hui Zhang, Faya; Zhu, Zhaohui; Luong, Dung; Meadows, Gary G.

    2015-01-15

    Alcohol consumption exhibits diverse effects on different types of immune cells. NKT cells are a unique T cell population and play important immunoregulatory roles in different types of immune responses. The effects of chronic alcohol consumption on NKT cells remain to be elucidated. Using a mouse model of chronic alcohol consumption, we found that alcohol increases the percentage of NKT cells, especially iNKT cells in the thymus and liver, but not in the spleen or blood. Alcohol consumption decreases the percentage of NK1.1{sup −} iNKT cells in the total iNKT cell population in all of the tissues and organs examined. In the thymus, alcohol consumption increases the number of NK1.1{sup +}CD44{sup hi} mature iNKT cells but does not alter the number of NK1.1{sup −} immature iNKT cells. A BrdU incorporation assay shows that alcohol consumption increases the proliferation of thymic NK1.1{sup −} iNKT cells, especially the NK1.1{sup −}CD44{sup lo} Stage I iNKT cells. The percentage of NKG2A{sup +} iNKT cells increases in all of the tissues and organs examined; whereas CXCR3{sup +} iNKT cells only increases in the thymus of alcohol-consuming mice. Chronic alcohol consumption increases the percentage of IFN-γ-producing iNKT cells and increases the blood concentration of IFN-γ and IL-12 after in vivo α-galactosylceramide (αGalCer) stimulation. Consistent with the increased cytokine production, the in vivo activation of iNKT cells also enhances the activation of dendritic cells (DC) and NK, B, and T cells in the alcohol-consuming mice. Taken together the data indicate that chronic alcohol consumption enhances iNKT cell maturation and activation, which favors the Th1 immune response. - Highlights: • Chronic alcohol consumption increases iNKT cells in the thymus and liver • Chronic alcohol consumption enhances thymic Stage I iNKT cell proliferation • Chronic alcohol consumption enhances iNKT cell maturation in thymus and periphery • Chronic alcohol

  9. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  10. Recommendations: 2010 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Annual Plan Recommendations: 2010 Annual Plan URTAC - Recommendations on 2010 Section 999 Annual Plan (365.56 KB) More Documents & Publications URTAC Meeting - December 18, 2013 2009 Annual Plan 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program

  11. Interconnection Transmission Planning: Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and Reinvestment Act organized by interconnection including the organization and amount of Recovery Act funding Interconnection Transmission Planning: Awards (39.73 KB) More Documents & Publications EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Report: Impacts of Demand-Side

  12. Recommendations: Draft Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan Recommendations: Draft Annual Plan Section 999 Annual Plan Recommendations on Draft 2014 Section 999 Annual Plan (409.54 KB) More Documents & Publications URTAC Meeting - December 18, 2013 Committee Report for December 18, 2013 Meeting Recommendations: Draft 2013 Annual Plan

  13. Environmental Restoration Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Restoration Strategic Plan Environmental Restoration Strategic Plan Environmental Restoration Strategic Plan, remediating the Nuclear Weapons Complex, August 1995, environmental_restoration_strategic_plan.pdf Environmental Restoration Strategic Plan (1.46 MB) More Documents & Publications FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008 Audit Report: IG-0528 Office of Information Resources (MA-90)

  14. 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Annual Plan 2007 Annual Plan Section 999: 2007 Annual Plan (9.24 MB) More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program Recommendations: Draft 2008 Section 999 Annual Plan UDAC Meeting - September 2009

  15. Work Plans & Manuals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections. Documents Available for Download November 20, 2014 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 December 23, 2014 Audit Manual 2014 Office of Inspector General Audit Manual

  16. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    SciTech Connect (OSTI)

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-11-15

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (?2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ?2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the original

  17. Projected Biomass Utilization for Fuels and Power in a Mature Market

    Broader source: Energy.gov [DOE]

    The U.S. biomass resource can be used several ways that provide domestic, renewable energy to users. Understanding the capacity of the biomass resource, its potential in energy markets, and the most economic utilization of biomass is important in policy development and project selection. This study analyzed the potential for biomass within markets and the competition between them. The study found that biomass has the potential to compete well in the jet fuel and gasoline markets, penetration of biomass in markets is likely to be limited by the size of the resource, and that biomass is most cost effectively used for fuels instead of power in mature markets unless carbon capture and sequestration is available and the cost of carbon is around $80/metric ton CO2e.

  18. Methyl-parathion decreases sperm function and fertilization capacity after targeting spermatocytes and maturing spermatozoa

    SciTech Connect (OSTI)

    Pina-Guzman, Belem; Sanchez-Gutierrez, M.; Marchetti, Francesco; Hernandez-Ochoa, I.; Solis-Heredia, M.J .; Quintanilla-Vega, B.

    2009-05-03

    Paternal germline exposure to organophosphorous pesticides (OP) has been associated with reproductive failures and adverse effects in the offspring. Methyl parathion (Me-Pa), a worldwide-used OP, has reproductive adverse effects and is genotoxic to sperm. Oxidative damage has been involved in the genotoxic and reproductive effects of OP. The purpose of this study was to determine the effects of Me-Pa on spermatozoa function and ability to fertilize. Male mice were exposed to Me-Pa (20 mg/kg bw, i.p.) and spermatozoa from epididymis-vas deferens were collected at 7 or 28 days post-treatment (dpt) to assess the effects on maturing spermatozoa and spermatocytes, respectively. DNA damage was evaluated by nick translation (NT-positive cells) and SCSA (percentDFI); lipoperoxidation (LPO) by malondialdehyde production; sperm function by spontaneous- and induced-acrosome reactions (AR); mitochondrial membrane potential (MMP) by using the JC-1 flurochrome; and, fertilization ability by an in vitro assay and in vivo mating. Results showed alterations in DNA integrity (percentDFI and NT-positive cells) at 7 and 28 dpt, in addition to decreased sperm quality and a decrease in induced-AR; reduced MMP and LPO was observed only at 7 dpt. We found negative correlations between LPO and all sperm alterations. Altered sperm functional parameters were associated with reduced fertilization rates at both times, evaluated either in vitro or in vivo. These results show that Me-Pa exposure of maturing spermatozoa and spermatocytes affects many sperm functional parameters that result in a decreased fertilizing capacity. Oxidative stress seems to be a likely mechanism ofthe detrimental effects of Me-Pa in male germ cells.

  19. Sample Business Plan Framework 5

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 5: A program that establishes itself as a government entity, then operates using a fee-based structure.

  20. Sample Business Plan Framework 2

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.