Powered by Deep Web Technologies
Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Master EM Project Definition Rating Index - Facility Disposition Definitions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

43 43 Master EM Project Definition Rating Index - Facility Disposition Definitions The following definitions describe the criteria required to achieve a maximum rating or maturity value of 5. It should be assumed that maturity values of 1-5 represent a subjective assessment of the quality of definition and/or the degree to which the end-state or maximum criteria have been met, or the product has been completed in accordance with the definition of maturity values. Rating Element Criteria for Maximum Rating COST A1 Cost Estimate A cost estimate has been developed and formally approved by DOE and is the basis for the cost baselines. The cost estimate is a reasonable approximation of Total Project Costs, and covers all phases of the project. The estimate is prepared in

2

Master EM Project Definition Rating Index - Traditional (Conventional) Definitions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 Master EM Project Definition Rating Index - Traditional (Conventional) Definitions The following definitions describe the criteria required to achieve a maximum rating or maturity value of 5. It should be assumed that maturity values of 1-5 represent a subjective assessment of the quality of definition and/or the degree to which the end-state or maximum criteria have been met, or the product has been completed in accordance with the definition of maturity values. Rating Element Criteria for Maximum Rating COST A1 Cost Estimate A cost estimate has been developed and formally approved by DOE and is the basis for the cost baselines. The cost estimate is a reasonable approximation of Total Project Costs, and covers all phases of the project. The estimate is prepared in

3

Master EM Project Definition Rating Index - Environmental Restoration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to an independent review by an organization not directly involved with the project (ICE, EIR, IPR, as required). The independent review has been documented, including the...

4

MASTER'S PROJECT NONPARAMETRIC SURVEY REGRESSION ESTIMATION IN TWO-STAGE  

E-Print Network (OSTI)

Northeastern Lakes Survey. Siobhan Everson-Stewart Statistics Department Colorado State University Fort Collins data, aerial pho- tographs, or other sources. In a common survey situation, a statistical agency, oftenMASTER'S PROJECT NONPARAMETRIC SURVEY REGRESSION ESTIMATION IN TWO-STAGE SPATIAL SAMPLING Submitted

5

Yakima Habitat Improvement Project Master Plan, Technical Report 2003.  

DOE Green Energy (OSTI)

The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a result of the planning effort leading to this Master Plan, a Technical Working Group (TWG) was established that represents most, if not all, fish and wildlife agencies/interests in the subbasin. This TWG met regularly throughout the planning process to provide input and review and was instrumental in the development of this plan. Preparation of this plan included the development of a quantitative prioritization process to rank 40,000 parcels within the Urban Growth Area based on the value of fish and wildlife habitat each parcel provided. Biological and physical criteria were developed and applied to all parcels through a GIS-based prioritization model. In the second-phase of the prioritization process, the TWG provided local expert knowledge and review of the properties. In selecting the most critical areas within the Urban Growth Area for protection, this project assessed the value of fish and wildlife habitat on the Yakima River. Well-developed habitat acquisition efforts (e.g., Yakima River Basin Water Enhancement Project by the Bureau of Reclamation and Yakama Nation acquisition projects) are already underway on the Yakima River mainstem. These efforts, however, face several limitations in protection of floodplain function that could be addressed through the support of the Yakima Habitat Improvement Project. This Master Plan integrates tributary habitat acquisition efforts with those ongoing on the Yakima River to best benefit fish and wildlife in the Urban Growth Area. The parcel ranking process identified 25 properties with the highest fish and wildlife value for habitat acquisition in the Yakima Urban Area. These parcels contain important fish and wildlife corridors on Ahtanum and Wide Hollow Creeks and the Naches River. The fifteen highest-ranking parcels of the 25 parcels identified were considered very high priority for protection of fish and wildlife habitat. These 15 parcels were subsequently grouped into four priority acquisition areas. This Master Plan outlines a four-year schedule for acquisition, protection, and restoration of the 25 highest ranked prop

Golder Associates, Inc.

2003-04-22T23:59:59.000Z

6

EM Capital Asset Project List  

Energy.gov (U.S. Department of Energy (DOE))

Read the EM Capital Asset Project List, which includes the project's name, site, current critical decision and current total project cost.

7

The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect

The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

Fix, N. J.

2009-04-03T23:59:59.000Z

8

Development of Facilities Master Plan and Laboratory Renovation Project  

SciTech Connect

Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the Schoolâ??s overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

Andrea D. Fox

2011-10-03T23:59:59.000Z

9

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

Fix, N. J.

2008-02-20T23:59:59.000Z

10

EM Contractors for Capital Asset Projects  

Energy.gov (U.S. Department of Energy (DOE))

Read the EM Contractors for Capital Asset Projects list, which includes the project name, number, site, and contractor.

11

Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2  

SciTech Connect

This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment.

BEVINS, R.R.

2000-03-24T23:59:59.000Z

12

Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2  

SciTech Connect

This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope.

BEVINS, R.R.

2000-09-20T23:59:59.000Z

13

Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ITR Landfill Assessment Project Lessons Learned Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned By: Craig H. Benson, PhD, PE Where: EM SSAB Teleconference: 1...

14

Directors Advance EM Mission with Help from Rigorous Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directors Advance EM Mission with Help from Rigorous Project Management Program Directors Advance EM Mission with Help from Rigorous Project Management Program October 30, 2013 -...

15

DOE EM Project Experience & Lessons Learned for In Situ Decommissionin...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) The purpose of...

16

Recovery Act Investment Moves EM Past Milestone of 100 Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Investment Moves EM Past Milestone of 100 Project Completions Recovery Act Investment Moves EM Past Milestone of 100 Project Completions The Office of Environmental...

17

Poneman Joins EM Contract and Project Management Workshop | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop June 7, 2013 - 12:00pm Addthis Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance. Deputy Secretary Daniel Poneman talks to participants in EM's Contract and Project Management Workshop this week. EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash discusses EM's current contract performance.

18

Master Project: Study of the interaction between multiple Wind Farms Wind Energy is the fastest growing source of energy, and its expansion seems  

E-Print Network (OSTI)

of wind turbines (so called wind farms) are being built. At present, much knowledge exists regarding single wind turbines and also about wind turbine interaction. Nevertheless, little is known aboutMaster Project: Study of the interaction between multiple Wind Farms Wind Energy is the fastest

19

Report: EM Acquisition and Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACQUISITION AND PROJECT MANAGEMENT September 25, 2008 Submitted by the EMAB Acquisition and Project Management Subcommittee Background: In Fiscal Year (FY) 2008, EMAB was tasked to...

20

CVEN 6960 master's project, investigation of a cooling coil in high humidity conditions. Master's thesis  

SciTech Connect

The primary purpose of this project is to validate the HVAC*2 Toolkit calculations for a cooling coil in high humidity conditions. A total of 19 experimental runs at different entering air temperature and humidity conditions were performed at the Joint Center for Energy Management HVAC Laboratory that exposed a cooling coil to temperature and humidity conditions that are typically found in the southern United States. The inlet conditions and manufacturer's coil rating data was used as input to the HVAC*2 Toolkit simple cooling coil subroutine (CCSIM). The predicted results from the toolkit were then compared to the experimental results.

Sloop, R.E.

1993-12-10T23:59:59.000Z

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Washoe Wisk'e'em Project  

DOE Green Energy (OSTI)

The Washoe Tribe Wiskem Project (Project) was a Congressionally Directed Project identified for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2010. The Project focused on installing up to four small vertical wind turbines at designated locations on Tribal lands to offset energy costs for the Tribe. The Washoe Tribe will use and analyze data collected from the wind turbines to better understand the wind resource.

Tara Hess-McGeown

2012-03-26T23:59:59.000Z

22

Status Report: EM Acquisition and Project Management Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report: Acquisition and Project Report: Acquisition and Project Management Review August 15, 2006 Submitted by: Mr. James Ajello and Mr. Dennis Ferrigno Background: The Environmental Management Advisory Board is in the process of providing Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management (EM-50), records of past EMAB recommendations and commentary. Mr. Ajello and Mr. Ferrigno believe that the records will be helpful to Mr. Surash and his staff. EMAB has identified the following actionable items: Provide Mr. Surash with EMAB committee files for review Have Mr. Ferrigno contact Mr. Surash to arrange a meeting for discussion of said materials Have Mr. Ajello and Mr. Ferrigno meet with Mr. Surash periodically to discuss project management and contract issues, as per request of EM-1.

23

EM Focuses on Contract, Project Management Improvements in Three-Day  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Focuses on Contract, Project Management Improvements in EM Focuses on Contract, Project Management Improvements in Three-Day Workshop EM Focuses on Contract, Project Management Improvements in Three-Day Workshop March 1, 2012 - 12:00pm Addthis ORLANDO, Fla. - EM held a three-day workshop in Orlando this month focusing on strategies to improve contract and project management across the EM complex. More than 100 EM employees attended the 2012 Contract and Project Management Workshop for a series of briefings and working sessions by dozens of EM leaders, including federal procurement and project directors. The event, held March 20-22, was hosted by EM's Office of Acquisition and Project Management. "There was a wide range of discussions on many aspects of contract and project management for our acquisition professionals throughout EM, as well

24

EM Focuses on Contract, Project Management Improvements in Three-Day  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Focuses on Contract, Project Management Improvements in Focuses on Contract, Project Management Improvements in Three-Day Workshop EM Focuses on Contract, Project Management Improvements in Three-Day Workshop March 1, 2012 - 12:00pm Addthis ORLANDO, Fla. - EM held a three-day workshop in Orlando this month focusing on strategies to improve contract and project management across the EM complex. More than 100 EM employees attended the 2012 Contract and Project Management Workshop for a series of briefings and working sessions by dozens of EM leaders, including federal procurement and project directors. The event, held March 20-22, was hosted by EM's Office of Acquisition and Project Management. "There was a wide range of discussions on many aspects of contract and project management for our acquisition professionals throughout EM, as well

25

Florida Boat ramp EnhancEmEnt and construction projEct General Project DescriPtion  

E-Print Network (OSTI)

Enhancement and Construction Project is $10,153,642. estiMateD cost The estimated cost for this project costs for some of the projects were updated from those provided in the DERP/EA. Actual costs may differFlorida Boat ramp EnhancEmEnt and construction projEct General Project DescriPtion This early

26

DOE EM Project Experience & Lessons Learned for In Situ Decommissioning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Project Experience & Lessons Learned for In Situ EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) The purpose of the "DOE EM Project Experience & Lessons Learned for In Situ Decommissioning" report is to capture the considerable technical experience gained to date for implementation of In Situ Decommissioning (ISD) projects at DOE facilities. As current and projected budgets for the EM program indicate reduced and flat funding profiles for the foreseeable future, the potential exists for this institutional knowledge to be lost as the ramp-down of project staffing commences with the cessation of ARRA. EM's Office of Deactivation & Decommissioning and Facility Engineering

27

EERE PROJECT M AN AG EM ENT CENT ER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

... RTl\1ENT OF ENERGY ... RTl\1ENT OF ENERGY EERE PROJECT M AN AG EM ENT CENT ER NEP .... DETERMINATION RECIPIENT:US Synthetic Corporation Page 1 of2 STATE: UT PROJECT TITLE: The Development of Open, Water Lubricated Polycrystalline Diamond Thrust Bearings For use in Marine Hydrokinetic (MHK) Energy Machines Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOO293 OE-EEOOO3633 GFO-OOO3633"()()1 EE3633 Based on my review orthe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.iA). I have made Ibe following determination: ex, EA, [ IS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including

28

One of EM's Last Recovery Act Projects at Oak Ridge Improves Safety at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

One of EM's Last Recovery Act Projects at Oak Ridge Improves One of EM's Last Recovery Act Projects at Oak Ridge Improves Safety at Laboratory One of EM's Last Recovery Act Projects at Oak Ridge Improves Safety at Laboratory November 26, 2013 - 12:00pm Addthis EM deactivated one of five ventilation branches that led to stack 3039. The ventilation branches are connected to numerous facilities throughout ORNL’s central campus. EM deactivated one of five ventilation branches that led to stack 3039. The ventilation branches are connected to numerous facilities throughout ORNL's central campus. OAK RIDGE, Tenn. - Workers recently completed the Building 4500 Stack Removal Project, one of the Oak Ridge EM program's final cleanup projects funded by the American Recovery and Reinvestment Act. The project separated six facilities from an old ventilation system that connects to a large

29

One of EM's Last Recovery Act Projects at Oak Ridge Improves Safety at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

One of EM's Last Recovery Act Projects at Oak Ridge Improves One of EM's Last Recovery Act Projects at Oak Ridge Improves Safety at Laboratory One of EM's Last Recovery Act Projects at Oak Ridge Improves Safety at Laboratory November 26, 2013 - 12:00pm Addthis EM deactivated one of five ventilation branches that led to stack 3039. The ventilation branches are connected to numerous facilities throughout ORNL’s central campus. EM deactivated one of five ventilation branches that led to stack 3039. The ventilation branches are connected to numerous facilities throughout ORNL's central campus. OAK RIDGE, Tenn. - Workers recently completed the Building 4500 Stack Removal Project, one of the Oak Ridge EM program's final cleanup projects funded by the American Recovery and Reinvestment Act. The project separated six facilities from an old ventilation system that connects to a large

30

Constructing Predictive Estimates for Worker Exposure to Radioactivity During Decommissioning: Analysis of Completed Decommissioning Projects - Master Thesis  

Science Conference Proceedings (OSTI)

An analysis of completed decommissioning projects is used to construct predictive estimates for worker exposure to radioactivity during decommissioning activities. The preferred organizational method for the completed decommissioning project data is to divide the data by type of facility, whether decommissioning was performed on part of the facility or the complete facility, and the level of radiation within the facility prior to decommissioning (low, medium, or high). Additional data analysis shows that there is not a downward trend in worker exposure data over time. Also, the use of a standard estimate for worker exposure to radioactivity may be a best estimate for low complete storage, high partial storage, and medium reactor facilities; a conservative estimate for some low level of facility radiation facilities (reactor complete, research complete, pits/ponds, other), medium partial process facilities, and high complete research facilities; and an underestimate for the remaining facilities. Limited data are available to compare different decommissioning alternatives, so the available data are reported and no conclusions can been drawn. It is recommended that all DOE sites and the NRC use a similar method to document worker hours, worker exposure to radiation (person-rem), and standard industrial accidents, injuries, and deaths for all completed decommissioning activities.

Dettmers, Dana Lee; Eide, Steven Arvid

2002-10-01T23:59:59.000Z

31

EERE PROJECT MANAG EM DI T CENTER NEPA DETERlIIINATION RECIPIENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTlIlllNT OFENERGl EERE PROJECT MANAG EM DI T CENTER NEPA DETERlIIINATION RECIPIENT:City of Jacksonville STATE: FL PROJECT TITLE: EECBG City of Jacksonville - SOW for...

32

ANIMAL SCIENCE Master Thesis Projects  

E-Print Network (OSTI)

Effect of LED-light on broilers' welfare, growth, and feed efficiency ................................24 efficiency and carcass quali- ty? We studied early vs. normal weaning age and three different feeding the influence of ration composition, e.g., total mixed rations vs. pelleted concentrate feeding, on the feed

33

ANIMAL SCIENCE Master Thesis Projects  

E-Print Network (OSTI)

Effect of LED-light on broilers' welfare, growth, and feed efficiency............................... 24? We studied early vs. normal weaning age and three different feeding strategies until slaughter the influence of ration composition, e.g., total mixed rations vs. pelleted concentrate feeding, on the feed

34

ANIMAL SCIENCE Master Thesis Projects  

E-Print Network (OSTI)

production and energy conversion for use in water-scarce areas of India; Bristol, Aston, Warwick SCORE ­ (S potential areas that could have an impact are the processing of lingo cellulosic material into bioethanol

35

Critical Skills Master's Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Skills Master's Program Skills Master's Program (CSMP): The Critical Skills Master's Program (CSMP) provides exceptional bachelor's-level candidates with the opportunity to pursue a fully funded Master's of Science degree. Successful applicants will become regular full-time Sandia employees and join multidisciplinary teams that are advancing the frontiers of science and technology to solve the world's greatest challenges. Program Requirements: * Apply to a minimum of 3 nationally accredited universities. * Successfully complete the GRE as required by the universities of interest. * Complete a master's degree within:

36

The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan  

Science Conference Proceedings (OSTI)

The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

Fix, N. J.

2008-02-11T23:59:59.000Z

37

Microsoft Word - EM Completed Projects 2005 to Present Cover 2013-12-16.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completed Projects 2005-Present Completed Projects 2005-Present December 16, 2013 U.S. Department of Energy Photos of Pit 9 buried waste retrieval operations inside the Accelerated Retrieval Project IV retrieval enclosure at the Idaho Site (from ENERGY.GOV's Photostream at http://www.flickr.com/photos/departmentofenergy/). In order to promote transparency with stakeholders and the public, the Office of Environmental Management (EM) is posting key project management information. This web page provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project's performance related to cost, schedule, and scope. The EM cleanup projects address large quantities of radioactive wastes, spent nuclear fuel, excess

38

Microsoft Word - EM Completed Projects 2005 to Present Cover 2013-11-05.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completed Projects 2005-Present Completed Projects 2005-Present November 5, 2013 U.S. Department of Energy Photos of Pit 9 buried waste retrieval operations inside the Accelerated Retrieval Project IV retrieval enclosure at the Idaho Site (from ENERGY.GOV's Photostream at http://www.flickr.com/photos/departmentofenergy/). In order to promote transparency with stakeholders and the public, the Office of Environmental Management (EM) is posting key project management information. This web page provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project's performance related to cost, schedule, and scope. The EM cleanup projects address large quantities of radioactive wastes, spent nuclear fuel, excess

39

Master's Fellowship Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Master's Fellowship Program Master's Fellowship Program (MFP): The Master's Fellowship Program (MFP) provides exceptional minority bachelor's-level candidates with the opportunity to pursue a fully funded Masters of Science degree. The MFP is a minority based program for U.S. under-represented groups in an effort to help enhance the diversity of Sandia's technical workforce. Successful applicants will become regular full-time Sandia employees and join multidisciplinary teams that are advancing the frontiers of science and technology to solve the world's greatest challenges. Program Requirements: * Apply to a minimum of 3 nationally accredited universities. * Successfully complete the GRE as required by the universities of interest.

40

MotorMaster+  

NLE Websites -- All DOE Office Websites (Extended Search)

industrial facilities, MotorMaster+ 4.0 contains expanded capabilities for inventory management, maintenance logging, lifecycle costing, savings tracking and trending,...

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Microsoft Word - EM Completed Projects 2005 to Present Cover...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ground water remediation, solid waste stabilization and disposition, nuclear and non-nuclear decommissioning and demolition. In each of these cleanup categories, EM has to...

42

Memo Issuance of EM Capital and Major Operating Project Standard Review Plan Edition Two  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAR 2 4 201011 MAR 2 4 201011 MEMORANDUM FOR DISTRIBUTION FROM: DR. STEVEN L. KRAHN DEPUTY ASSISTANT SAFETY AND SECU EIVVIROIVMENTAL MANAGEMENT SUBJECT: Issuance of Environmental Management Capital and Major Operating Project Standard Review Plan Edition Two The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission critical projects/facilities. Effective management of these projects requires multiple disciplines to be integrated and engaged at various project lifecycle phases. These disciplines include project management, engineering, design, safety, environment, safeguards and security, and quality assurance. The lessons-learned to date from ongoing Headquarters (HQ) and Field project reviews [e.g., Construction Project

43

Performance Prediction and Analysis of BOINC Projects: An Empirical Study with EmBOINC  

E-Print Network (OSTI)

Number of jobs Performance Prediction and Analysis of BOINCjob), execution Traces Fig. 3 Statistical host modeling Performance Prediction and Analysisand Analysis of BOINC Projects Table 3 Total throughput values in WCG and EmBOINC simulations Job

Estrada, Trilce; Taufer, Michela; Anderson, David P.

2009-01-01T23:59:59.000Z

44

INTERNATIONAL MASTERS PROGRAMMES 2010 -2011  

E-Print Network (OSTI)

INTERNATIONAL MASTER´S PROGRAMMES 2010 - 2011 MASTER OF SCIENCE IN ENGINEERING MASTER OF SCIENCE IN NATURAL SCIENCES MASTER OF PHILOSOPHY Editorial: Division of Student and Academic Affairs Printed: June ........................................................................................................................................ 3 Norwegian University of Science and Technology (NTNU

Bones, Atle M.

45

INTERNATIONAL MASTERS PROGRAMMES 2012 -2013  

E-Print Network (OSTI)

INTERNATIONAL MASTER´S PROGRAMMES 2012 - 2013 MASTER OF SCIENCE IN ENGINEERING MASTER OF SCIENCE IN NATURAL SCIENCES MASTER OF PHILOSOPHY #12;CONTENTS Introduction ........................................................................................................................................ 3 Norwegian University of Science and Technology (NTNU

Malinnikova, Eugenia

46

High School Students Engage EM Program, Teach Classmates about Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

High School Students Engage EM Program, Teach Classmates about High School Students Engage EM Program, Teach Classmates about Nuclear Cleanup High School Students Engage EM Program, Teach Classmates about Nuclear Cleanup May 22, 2012 - 12:00pm Addthis NSSAB student liaisons Gumabon, left, and Leavitt discuss their project involving a student survey and educational tool to members of the NSSAB. NSSAB student liaisons Gumabon, left, and Leavitt discuss their project involving a student survey and educational tool to members of the NSSAB. McMaster, left, and Sakalla were presented plaques by Dave Adler, DOE-EM liason to ORSSAB, in recognition for their service to ORSSAB. McMaster, left, and Sakalla were presented plaques by Dave Adler, DOE-EM liason to ORSSAB, in recognition for their service to ORSSAB. NSSAB student liaisons Gumabon, left, and Leavitt discuss their project involving a student survey and educational tool to members of the NSSAB.

47

EM's New Project of the Month Focuses on Tribes' Work with Native  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Project of the Month Focuses on Tribes' Work with New Project of the Month Focuses on Tribes' Work with Native Plants for Hanford Site EM's New Project of the Month Focuses on Tribes' Work with Native Plants for Hanford Site January 17, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM is highlighting important work by the Confederated Tribes of the Umatilla Indian Reservation in a new Project of the Month on EM's public Web site, www.em.doe.gov. With the help of EM funding, the Umatilla Tribes have been building a tribal field station and two greenhouses for researching and reproducing native plants to revegetate the Hanford site. Habitat at the site has been disturbed by EM's Cold War cleanup and subsequent restoration, as well as natural forces such as wildfires. Addthis Related Articles The Confederated Tribes of the Umatilla Indian Reservation's field station, located in Mission, Ore., will be home to one-of-a-kind research and development for revegetation efforts.

48

Eastern Seaport Master Plan.  

E-Print Network (OSTI)

??The âEastern Seaport Master Planâ is the design of a mixed-use neighborhood in South Boston, a site that has an enormous amount of potential to… (more)

Wendt, Michael George

2011-01-01T23:59:59.000Z

49

Acronym master list  

Science Conference Proceedings (OSTI)

This document is a master list of acronyms and other abbreviations that are used by or could be useful to, the personnel at Los Alamos National Laboratory. Many specialized and well-known abbreviations are not included in this list.

NONE

1995-06-01T23:59:59.000Z

50

MotorMaster+ International  

NLE Websites -- All DOE Office Websites (Extended Search)

Motors with MotorMaster+ International * Are your plant motor systems running at optimal energy efficiency? * Do you know how to cost-effectively determine whether to repair or...

51

EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT QUALITY ASSURANCE IMPROVEMENT INITIATIVE EM CENTRALIZED TRAINING PLATFORM PROJECT PLAN Prepared by: Date: Approved by: Date: Revision 0 Page 3 of 30 05/11/09 1.0 INTRODUCTION The Department of Energy (DOE) expertise in quality assurance (QA) has degraded significantly over the last 10 years due to workforce attrition and the lack of emphasis on QA principles. Since the 2007 establishment and subsequent implementation of the Office of Environmental Management (EM) Quality Assurance Improvement Initiative, the need for trained QA specialists and personnel familiar with the role of QA in integrated safety management and project management is becoming critical. As EM Field Offices struggle to identify sufficient resources to properly implement the EM Quality

52

NETEX Test Master Plan Draft 8/15/02  

E-Print Network (OSTI)

NETEX Test Master Plan Draft 8/15/02 1 The Defense Advanced Research Projects Agency (DARPA) Networking in Extreme Environments (NETEX) Program TEST MASTER PLAN FOR THE NETEX PROGRAM 1.0 INTRODUCTION This document provides a plan for testing a number of selected military systems to determine the susceptibility

Buehrer, R. Michael

53

Recovery Act Investment Moves EM Past Milestone of 100 Project Completions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2, 2012 August 2, 2012 WASHINGTON, D.C. - The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently paused to observe a notable achievement: completion of more than 100 projects in its $6 billion cleanup of the Manhattan Project and Cold War legacy. "We marked an important milestone when we safely completed a significant amount of work - 103 of the 129 projects and activities that comprise the Recovery Act- funded cleanup in 12 states across the DOE Complex," EM Recovery Act Program Director Thomas Johnson said. "In addition, we are on schedule to complete the bulk of the remaining projects in this fiscal year and the last few in fiscal year 2013." Johnson noted other significant accomplishments in the program. More than 90

54

ELECTRONIC MASTER SLAVE MANIPULATOR  

DOE Patents (OSTI)

A remote control manipulator is described in which the master and slave arms are electrically connected to produce the desired motions. A response signal is provided in the master unit in order that the operator may sense a feel of the object and may not thereby exert such pressures that would ordinarily damage delicate objects. This apparatus will permit the manipulation of objects at a great distance, that may be viewed over a closed TV circuit, thereby permitting a remote operator to carry out operations in an extremely dangerous area with complete safety.

Goertz, R.C.; Thompson, Wm.M.; Olsen, R.A.

1958-08-01T23:59:59.000Z

55

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETERlIIINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM EM ENT CENTER NEPA DETERlIIINATION RECIPIENT:TEXAS COMPTROLLER OF PUBLIC ACCOUNTS PROJECT TITLE; ARRA SEP SINTON ISD WIND PROJECT Page lof 2 STATE: TX Funding Opportunity Announctment Num~r Proc:urtmtnl Instrument Numbn N[PA Control Numbrr em Number DE-EEOOOO116 EEOOOO116 EEll6 Baud on my review o(thc information concerning the proposed action, as NEPA Compliance Officer (authoriud undu DOE Order 45I.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to. literature surveys, inventories, audits), data analysis (inCluding computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies). and dissemination (including. but not limited to, document mailings. publication. and distribution;

56

Federal Energy Management Program: Project Facilitation  

NLE Websites -- All DOE Office Websites (Extended Search)

support, and commitment to project goals Kickoff meeting support Interagency agreement Audit Review and Master Agreement Development The audit review and master agreement...

57

Headquarters Facilities Master Security Plan | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Security Headquarters Facilities Master Security Plan Headquarters Facilities Master Security Plan Welcome to the 2013 version of the Headquarters Facilities Master Security...

58

Commonwealth's Master Equipment Leasing Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commonwealth's Master Equipment Leasing Program Commonwealth&#039;s Master Equipment Leasing Program Commonwealth's Master Equipment Leasing Program < Back Eligibility Institutional State Government Program Info State Virginia Program Type Leasing Program Provider Virginia Department of the Treasury The [http://www.trs.virginia.gov/debt/MELP%20Guides.aspx Master Equipment Leasing Program] (MELP) ensures that all Commonwealth agencies, authorities and institutions obtain consistent and competitive credit terms for financing equipment and energy efficiency projects. Agencies can finance energy projects at a minimum of $10,000 and can make repayments over 3, 5, 7 and 10 year terms. '''Qualifying Energy Projects''' Energy efficiency projects may include personal property, the installation or modification of an installation in a building, professional management,

59

Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT TO THE REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the Environmental Management Advisory Board, since tasking in March 2010. In particular, this report includes the summary observations developed and recommendations previously approved by the EMAB on the Subcommittee's work and presented to the then Assistant Secretary of Environmental Management (EM). As the

60

u.s. DEPARUvlllNT OF ENER GY EE RE PROJECT MANAG EM ENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARUvlllNT OF ENER DEPARUvlllNT OF ENER GY EE RE PROJECT MANAG EM ENT CENTER NEPA DETERl\IlNATION RECIPIENT:MI Department of Energy, Labor & Economic Growth PROJECT TITL E : SEP - Green Chemistry - CEAM Phase 3 - KTM Industries Page 1 oI2 STATE: Ml Funding Opportunity Announcement Number DE-FOA-OOOOO52 Procurement Instrument Number DE-EEOOOO166 NEPA Control Number em Num ber GFO-OOOO166-032 GOO Based on my review of the information concerning the proposed ac tion, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination : ex, EA, [IS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

T OF ENERGY EERE PROJECT MANAG EM ENT CENT ER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTJ\ffiN DEPARTJ\ffiN T OF ENERGY EERE PROJECT MANAG EM ENT CENT ER NEPA DETERMINATION RECIPIENT:BISON GEAR & ENG PROJECT TITLE; HYPOID GEAR MOTOR PLATFORM Page 1 of2 .; STATE: IL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOO52 EEOOOO1 19 EE119 Based on my review of the infonnation concerning the proposed action, as NEPA Compliance Officer (aulhoriud under DOE Order 451.1A), I have made the following detennination: ex. EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially hannful substances. These actions may involve financial and technical

62

u.s. DEPARHIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARHIENT OF ENERGY DEPARHIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENTER NEPA DETERl\.-IINATION Page I of2 RECIPIENT:Fort Bend County STATE: TX PROJECT TITLE: Energy Efficiency Conservation Block Grant Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE·EEOOOQ916 DE-EE0000916 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order451.1A), I have made tbe following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do nol increase the indoor concentrations of potentially hannful substances. These actions may involve financial and technical

63

U.S. DEPARTIlIFNT OF ENERGY EERE PROJECT MAN AG EM ENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTIlIFNT OF ENERGY DEPARTIlIFNT OF ENERGY EERE PROJECT MAN AG EM ENT CENTER Nl!PA DETl!RMINATION RECIPIENT :City of San Diego PROJECT T ITLE: Fire Safe and Energy Independent Communities Page 1 of2 STATE: CA Funding Opportunity Announcement Number DE-FOA-QOOOO78 Procurement Instrument Number DE·EEOOO2074 NEPA Control Number em Number GFO-O002074-OO2 0 Based on my review orthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI . IA), 1 have made the following detumination: ex, EA, EIS APPEN D IX AND NUMBER : Descriptio n: 85.1 Actions to conserve energy. demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

64

u.s. DEPART1IENT OF ENERGY EERE PROJECT MANAG EM ENT CEN T ER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE PROJECT MANAG EERE PROJECT MANAG EM ENT CEN T ER NEPA DETER1.IINATION RECIPIENT:TEXAS COMPTROLLER OF PUBLIC ACCOUNTS PROJECT TITLE: ARRA SEP CITY OF ADDISON TURBINE PROJECT Page 1 of2 STATE: TX Funding Opportunity AnDouncement Number Proc:urcmentlnstrumcnt Number NEPA Control Number CID Number DE·EEOOOO116 EEOOOO116 EE116 Based on my review oftbe informatioll concerning the proposed action, as NEPA Compliance Officer (authoriud under DOE Order 4Sl.IA), I ban made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including. but not limited to, literature surveys, inventories, audits). dala analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

65

u.s. DEPARThIENT OF ENFRGY EERE PROJECT MANAG EM ENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENFRGY ENFRGY EERE PROJECT MANAG EM ENT CENTER NFPA DETERl\lINATION Page 1 of3 RECIPIENT:City of Lincoln. NE STATE: NE PROJECT TITLE; DE EE0000664 City of Lincoln NE EECBG Project #18 Energy Demonstration Project Funding Opportunity Announcement Number Procurement Instrumcnt Number NEPA Control Number CID Number DE-FOA-OOOOO13 OE·EEOOOO664.003 0 Based on my review of the inronnation (oncuning the proposed ac:tion, as NEPA Compliance Officer (authoriud uDder DOE Order 451.IA), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

66

Fermilab Master Plan Fermilab Master Plan Overview Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Master Plan Master Plan Fermilab Master Plan Overview Presentation Mission Support Organization Planning Winter Workshop Feb 20, 2013 Thursday, February 21, 13 Fermilab Master Plan Integrating the new vision for the Intensity Frontier facilities and other Science with a sound strategy for infrastructure and support facility development Thursday, February 21, 13 Fermilab Master Plan In order to help define and best use all laboratory resources to most effec5vely and efficiently meet Fermilab's Plan for Discovery, the laboratory is developing a Fermilab Campus Master Plan (FCMP) for the next 20 years. The document will guide the development of modern, produc5ve, and efficient laboratory facili5es that will enable the laboratory to fulfill its mission of advancing

67

DEPARTIIIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENT ER NEPA DETElThIINAIION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Irmo Irmo u.s. DEPARTIIIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENT ER NEPA DETElThIINAIION PROJECT TITl.E: Irma Charing Cross Sidewalk Project ARRA-EECBG Page 1 of2 fJ Wl G) STATE: SC Funding Opportunity Announcement Number PrOCUT£ment Instrument Number NEPA Control Number CID Number EEOOO0950/000 DE-EEOOOO950 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1 A), I have made the following determination: ex, EA, EIS APPENDlX AND NUMBER: Description: 85.1 Actions to conselVe energy, demonstrate potential energy conservation , and promote energy.efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

68

MasteringWeb Services Security MasteringWeb Services Security  

E-Print Network (OSTI)

Preview of MasteringWeb Services Security Preview of MasteringWeb Services Security Konstantin introduction Highlights of the book Web Services security problem XML Security WS-Security Security mechanisms for ASP.NET Web Services Planning and building secure Web Service systems ­ Architectural and policy

69

u.s. DEPARTIIIENT OF ENERGY EERE PROJECT MANAG EM EN T CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAG MANAG EM EN T CENTER NEPA DETERlIIINATION RECIPI(£NT:MicroLink Devices, Inc. PROJECT TITLE: MicroUnk Devices Solar Cell Fabrication Facility Page 1 of2 STATE: IL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOOS2 EE0000119 GFO-10-326 0 Based on my review orlhe infonnation concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.1A), I have made thl' following detennination: ex, EA, EIS APPENDIX AND NUMBER: Description: B1.31 Relocation of machinery and equipment, such as analytical laboratory appara tus, electronic hardware, maintenance equipment. and health and safety equipment, inCluding minor construction necessary for removal and installation,

70

Master Plan For Improving Energy Efficiency  

E-Print Network (OSTI)

Presidential Executive Order 12003, dated July 1977, directed all government owned or leased facilities to develop and execute a 10-year Energy Conservation Plan. With facilities in seven states totaling 15 million square feet, the Albuquerque Operations Office of the Department of Energy (DOE) suddenly was facing a challenge. A Master Energy Management Plan was developed. With the 10-year period now nearly over, the effectiveness of the Master Plan can be examined. One DOE facility, the Kansas City plant which is operated by the Bendix Corporation for the DOE, has accomplished a 52 percent reduction so far, exceeding the goals by more than double the projected reduction. This paper will provide a detailed description of the integrated approach taken in making this plant the DOE's "Best Energy Managed Production Plant in 1982" and recipient of "Power Magazine's 1983 Industrial Energy Award."

Johnson, W. H.

1985-05-01T23:59:59.000Z

71

EM SSAB ITR Landfill Assessment Project Lessons Learned Presentation - July 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Teleconference: Teleconference: 1. DOE EM ITR Landfill Assessment Project: Lessons Learned Craig H. Benson, PhD, PE CRESP July 2009 1 Independent Technical Review Team * Craig H. Benson, PhD, PE - University of Wisconsin-Madison: waste containment systems, civil engineering, geotechnical engineering. * William H. Albright, PhD - Desert Research Institute, Reno, Nevada: waste containment systems, hydrology, regulatory interactions. * David P. Ray, PE - US Army Corps of Engineers, Omaha, NB: waste containment systems, civil engineering, geotechnical engineering. * John Smegal - Legin Group, Washington, DC: economics, management. 2 * Mixed-waste landfill authorized by EPA and Washington State DoE for disposal of

72

u.s. DEP.-\RTUENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RTUENT OF ENERGY RTUENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETERlIlINATION RECIPI ENT:RI Office of Energy Resources PROJECT TITLE: State of Rhode Island - EECBG Page 1 of2 STATE: R I Funding Opportunity Announcement Number Procurement Instrument Numbu NEPA Control Numbu CID Number DE-FOA-OOOOO13 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the indoor concentrations of polentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

73

U.S. DEPARTIvIENT OF ENERGY EERE PROJECT MAN AG EM EN T CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

·OUJ, ·OUJ, U.S. DEPARTIvIENT OF ENERGY EERE PROJECT MAN AG EM EN T CENTER NEPA DETERlIIINATION RECIPIENT:Ohio Department of Development PROJECT TITLE: SEP ARRA - Hard Livestock Page 1 0[2 STATE: OH Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number EE0000165 GFO-O000165-024 GOO Based on my review orthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following detennination: ex, EA, EIS APPENDIX AND NUMBER: Description : 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concen trations of potentially harmful substances. These actions may involve financial and technical

74

u.s. DEPARn-IENT OF ENERGY EERE PROJECT MANAG EM EN T CEN T  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARn-IENT OF ENERGY DEPARn-IENT OF ENERGY EERE PROJECT MANAG EM EN T CEN T ER NEPA DETERl\IINATION RECIPIENT:TEXAS COMPTROLLER OF PUBLIC ACCOUNTS PROJECT TITLE: ARRA SEP UNIVERSITY OF NORTH TEXAS - DENTON Page 1 of2 STATE; TX Funding Opportunity AUDouDCl'ment Numbt'r Procurement Instrument Number NEPA Control Number CID Number DE-EEOOOO116 EEOOOO116 EE116 Based on my nvil'w orlhl' information ('onenning thl' proposed adioD, as NEPA Compliance Officer (authorizt'd under DOE Order451.lA). I have made the following determination: ex, EA, [IS APPENDIX AND NUMBER: Description: A9 Information gathering (includ ing, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (suCh as conceptual design or feasibility studies, analytical energy supply

75

u.s. DEPARTlvIENT OF ENERGY EERE PROJECT MAN Au EM EN T CENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTlvIENT OF ENERGY DEPARTlvIENT OF ENERGY EERE PROJECT MAN Au EM EN T CENT ER NEPA DETERMINATION RECIPIENT:City of Scottsdale, Arizona PROJECT TITLE ; Reclamation Facilities Blower Replacements Page 1 of2 STATE; f:..Z. FundinJ: Opportunity Announcement Number Procuremeut I.nstrument Number NEPA Control Number cm Number - DE-EEOOOOB45 DE-EE0000845 GFO-O000B45-003 0 Based on my review oftbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the followiug determination : CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

76

U.S DEPARTlIfENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.u .u ., :. U.S DEPARTlIfENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETI!RMINATION RECIPIENT :Slale of Utah PROJECT TITLE: Large Scale Solar - Roof Mounted - Red Rock canyon School Page 1 of2 STAn::: UT Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-FOA-OOOOO52 EEOOOOO83 GF0-0000083-015 EE83 Based on my review of the information concerning the proposed action, as NEPA Compliance Offictr (authori7.ed under DOE Orner 451.1A), I have made the following deter-minatlon: ex, EA, [IS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficlency that do not Increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

77

u.s. DEPARTIHENT OF ENERGY EERE PROJECT MAN AG EM ENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTIHENT OF ENERGY DEPARTIHENT OF ENERGY EERE PROJECT MAN AG EM ENT CENTER NEPA DETER]'vIINATION PROJECT TITLE: City of Mesa Reclamation Blower Units Page I of2 STATE:AZ. Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-EEOOOO840 GFO-OOOO840-002 0 Based on my review oflhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order45l.lA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

78

u.s. DEPARUIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

p .* p .* *. O!, u.s. DEPARUIENT OF ENERGY EE RE PROJECT MANAG EM ENT CENTER NEPA DETERl\IINATION RECIPIENT:Pyramid Lake Paiute Tribe PROJECT TITLE: Recovery Act: Geothermal Technologies Program STATE: NV Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Numbu CID Number DE~FOA-OOOO-109 DE-EEOOO2842 GF0-10-336 G02642 Based on my review orcbe information concerning the proposed adion, as NEPA Compliance omcer (auCboriud under DOE Order 4SI.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to. literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

79

Advanced Manufacturing Office: MotorMaster+ International  

NLE Websites -- All DOE Office Websites (Extended Search)

on Twitter Bookmark Advanced Manufacturing Office: MotorMaster+ International on Google Bookmark Advanced Manufacturing Office: MotorMaster+ International on Delicious Rank...

80

Advanced Manufacturing Office: MotorMaster+  

NLE Websites -- All DOE Office Websites (Extended Search)

MotorMaster+ to MotorMaster+ to someone by E-mail Share Advanced Manufacturing Office: MotorMaster+ on Facebook Tweet about Advanced Manufacturing Office: MotorMaster+ on Twitter Bookmark Advanced Manufacturing Office: MotorMaster+ on Google Bookmark Advanced Manufacturing Office: MotorMaster+ on Delicious Rank Advanced Manufacturing Office: MotorMaster+ on Digg Find More places to share Advanced Manufacturing Office: MotorMaster+ on AddThis.com... MotorMaster+ This photo shows the inner workings of an industrial electric motor with gears. In the lower left hand corner are the words "MotorMaster+" and underneath are the words "Motor-Driven Systems." Download MotorMaster+ now! Version: 4.01.01 Release Date: September 21, 2010 Release Notes Metric Unit Measurements: No

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Master Renovables | Open Energy Information  

Open Energy Info (EERE)

Master Renovables Master Renovables Jump to: navigation, search Name Master Renovables Place Barcelona, Egypt Zip 8020 Sector Solar Product Master Renovables brings solar energy solutions and cost-effective investments for companies, taking advantage of the available public grants, either at local, regional, national or European level. Coordinates 41.385589°, 2.168745° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.385589,"lon":2.168745,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

82

Commonwealth's Master Equipment Leasing Program  

Energy.gov (U.S. Department of Energy (DOE))

The [http://www.trs.virginia.gov/debt/MELP%20Guides.aspx Master Equipment Leasing Program] (MELP) ensures that all Commonwealth agencies, authorities and institutions obtain consistent and...

83

Mixed waste focus area integrated master schedule (current as of May 6, 1996)  

SciTech Connect

The mission of the Mixed Waste Characterization, Treatment, and Disposal Focus Area (MWFA) is to provide acceptable treatment systems, developed in partnership with users and with the participation of stakeholders, tribal governments, and regulators, that are capable of treating the Department of Energy`s (DOE`s) mixed wastes. In support of this mission, the MWTA produced the Mixed Waste Focus Area Integrated Technical Baseline Report, Phase I Volume 1, January 16, 1996, which identified a prioritized list of 30 national mixed waste technology deficiencies. The MWFA is targeting funding toward technology development projects that address the current list of deficiencies. A clear connection between the technology development projects and the EM-30 and EM-40 treatment systems that they support is essential for optimizing the MWFA efforts. The purpose of the Integrated Master Schedule (IMS) is to establish and document these connections and to ensure that all technology development activities performed by the MWFA are developed for timely use in those treatment systems. The IMS is a list of treatment systems from the Site Treatment Plans (STPs)/Consent Orders that have been assigned technology development needs with associated time-driven schedules, Technology deficiencies and associated technology development (TD) needs have been identified for each treatment system based on the physical, chemical, and radiological characteristics of the waste targeted for the treatment system. The schedule, the technology development activities, and the treatment system have been verified through the operations contact from the EM-30 organization at the site.

NONE

1996-05-01T23:59:59.000Z

84

PMC· FF2a U.S. DEPARThiENT OF ENERGY EERE PROJECT MANAG EM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FF2a U.S. DEPARThiENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETERJ\fiNATION Page 1 of2 RECIPIENT:South Carolina Energy Office (SCEO) STATE: SC PROJECf TITLE: State Energy Program- 2012 Formula Grant Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000643 EE0003884 GF0-0003884-001 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), data analysis (including, but not limited to, computer modeling}, document preparation

85

Master Powerpoint Briefing - Color  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Update Program Update Presented to: Transportation External Coordination Working Group Presented by: Gary Lanthrum, Director Office of Logistics Management January 31, 2007 Atlanta, GA 2 Introduction * Provide status of Office of Civilian Radioactive Waste Management (OCRWM) and its mission - Strategic objectives - Program milestones - Key issues - Near-term Program priorities * Present transportation program update - Office of Logistics (OLM) projects - FY 2006 accomplishments - Nevada Transportation Project status and milestones - National Spent Fuel Transportation Plan - FY 2007 transportation program priorities * Conclusions 3 * Submit a high-quality and docketable license application to the Nuclear Regulatory Commission no later than June 30, 2008 * Design, staff and train the OCRWM organization

86

Master Powerpoint Briefing - Color  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presented by: Presented by: Gary Lanthrum, Director Gary Lanthrum, Director Office of National Transportation Office of National Transportation April 4, 2005 April 4, 2005 Phoenix, AZ Phoenix, AZ Introduction * Since the September 2004 Transportation External Coordination Working Group (TEC) meeting, the Office of National Transportation (ONT) has made steady progress in developing the transportation infrastructure in its four project areas: - Infrastructure Acquisition Transportation casks Rolling Stock - Nevada Rail - Operational Planning - Institutional * ONT has refined the management infrastructure to integrate and oversee the four project areas. * ONT has expanded its interactions with other Office of Civilian Radioactive Waste Management (OCRWM) program elements.

87

Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Facilities Disposition Project Integrated Facilities Disposition Project Technical Assistance Page 1 of 2 Oak Ridge National Laboratory Y-12 National Security Complex Tennessee Tennessee Assessment of the Integrated Facility Disposition Project at ORNL & Y-12 for Transfer of Facilities & Materials to EM Challenge In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program Secretarial Offices (PSOs) of Nuclear Energy (NE), Science (SC), and the National Nuclear Security Administration (NNSA) to propose facilities and legacy waste for transfer to Environmental Management (EM) for final disposition or deactivation and decommissioning (D&D). In parallel with the EM-1 initiative, the Oak Ridge Reservation was conducting a Critical

88

Master Powerpoint Briefing - Color  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Logistics Management Update Logistics Management Update Presented to: Transportation External Coordination Working Group Presented by: Gary Lanthrum, Director Office of Logistics Management July 24, 2007 Kansas City, Missouri 2 Introduction Office of Logistics Management (OLM) priorities Benchmarking studies Nevada Transportation Project Routing of Office of Civilian Radioactive Waste Management (OCRWM) shipments Social risk Sabotage studies Package performance study Tribal workshop Industry interactions 3 FY 2007 OLM Priorities Issue National Transportation Plan Complete draft Environmental Impact Statement for a Rail Line to the Yucca Mountain Repository (Rail SEIS) Publish draft Nuclear Waste Policy Act (NWPA) Section 180(c) policy Continue work on routing criteria for a preliminary

89

master.PDF  

Gasoline and Diesel Fuel Update (EIA)

1998 1998 ES1 April 1998 Highlights World Oil Prices: Weak Fundamentals May be Difficult to Counteract Proposals by major producers inside and outside of OPEC to reduce the burgeoning surplus may keep oil prices from sliding to new record lows this year, but, compared to 1997, price levels are still expected to be down throughout 1998, with corresponding impacts on petroleum product prices. U.S. refiner costs for imported oil are now expected to average about $14.70 per barrel this year, compared to $18.60 in 1997. Record Low Fuel Costs for Motorists Likely This Summer Given our base case projections for crude oil prices, it is likely that motorists will experience this year the lowest (inflation-adjusted) gasoline prices ever for a summer. Average retail prices for the second and

90

Graduate Handbook Master of Music  

E-Print Network (OSTI)

Graduate Handbook Master of Music Department of Music & Dance School of Fine Arts University of Kansas Revised 2008 M.M. Handbook/October 2008 #12;TABLE OF CONTENTS PAGE HOW TO USE THIS HANDBOOK and voice students Level required in music history and theory courses M.M. Handbook/October 2008ii #12

Peterson, Blake R.

91

McMaster Security 2012 Annual Report  

E-Print Network (OSTI)

McMaster Security Services 2012 Annual Report #12;McMaster Security Services ­ Annual Report 2012 2 Mission Statement Developing a safe and secure environment in this academic institution within the McMaster community is assigned to the Security Services Department. Methods and approaches

Thompson, Michael

92

G< TEI-779 MASTER  

Office of Legacy Management (LM)

c*£ c*£ & G< TEI-779 MASTER (fA/L-y-yj. U. S. DEPARTMENT OF THE INTERIOR GEOLOGIC INVESTIGATIONS IN SUPPORT OF PROJECT CHARIOT, PHASE 111, IN THE VICINITY OF CAPE THOMPSON, NORTH- WESTERN ALASKA Preliminary Report By Reuben Kachadoorian Russell H. Campbell George W. Moore David W. Scholl January 1961 Arthur H. Lachenbruch Rex V. Allen Gordon W. Greene Roger M. Waller B. Vaughn Marshall Marvin J. Slaughter David F. Barnes This report is preliminary and has not been edited for con- formity with Geological Survey format and nomenclature. Geological Survey Washington, D. C. Prepared by Geological Survey for the UNITED STATES ATOMIC ENERGY COMMISSION Office of Technical Information L E G A L N O T I C E This report was prepared as an account of Government sponsored work. Neither the United

93

Collaborative development of Estonian nuclear master's program  

Science Conference Proceedings (OSTI)

In 2009 Estonia approved the National Development Plan for the Energy Sector, including the nuclear energy option. This can be realized by construction of a nuclear power plant (NPP) in Estonia or by participation in neighboring nuclear projects (e.g., Lithuania and/or Finland). Either option requires the availability of competent personnel. It is necessary to prepare specialists with expertise in all aspects related to nuclear infrastructure and to meet workforce needs (e.g. energy enterprises, public agencies, municipalities). Estonia's leading institutions of higher education and research with the support of the European Social Fund have announced in this context a new nuclear master's curriculum to be developed. The language of instruction will be English. (authors)

Tkaczyk, A. H.; Kikas, A.; Realo, E.; Kirm, M.; Kiisk, M.; Isakar, K.; Suursoo, S.; Koch, R.; Feldbach, E.; Lushchik, A.; Reivelt, K. [Inst. of Physics, Univ. of Tartu, Riia 142, Tartu 51014 (Estonia)

2012-07-01T23:59:59.000Z

94

Performance Prediction and Analysis of BOINC Projects: An Empirical Study with EmBOINC  

E-Print Network (OSTI)

6] or emulators such as MicroGrid [27] and MobiNet [16].EmBOINC. Emulators such as MicroGrid [ 27] and Mobi- Net [

Estrada, Trilce; Taufer, Michela; Anderson, David P.

2009-01-01T23:59:59.000Z

95

EM Press Releases | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 26, 2013 September 26, 2013 Task Order Awarded for Technical Support Services Cincinnati - The Department of Energy (DOE) today awarded a Task Order for Technical Services to Project Enhancement Corporation, of Germantown, MD, for technical support services at the Environmental Management 13 (EM-13) office in Washington DC. September 4, 2013 DOE Awards Task Order for Disposal of Los Alamos National Laboratory Waste Cincinnati - The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed Low-Level Waste Disposal Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract. The award is a firm,

96

EM Capital and Major Operating Project Standard Review Plan Edition Two  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum introduces the Second Edition of the Capital and Major Operations Projects Standard Review Plan (SRP).

97

The MotorMaster+ Software Tool  

NLE Websites -- All DOE Office Websites (Extended Search)

motors.html MotorMaster+ also provides technical data that can assist with the optimization of drive systems, motor purchasing, and energy accounting, as well as energy...

98

Master of Social Work Program STUDENT HANDBOOK  

E-Print Network (OSTI)

Master of Social Work Program STUDENT HANDBOOK 2013-2014 Academic Year #12;TABLE OF CONTENTS SECTION I: MU-SU MSW PROGRAM ............................................................................................ 1 SOCIAL WORK EDUCATION

Hardy, Christopher R.

99

u.s. DEPARTlI'IENT OF ENERGY EE RE PROJECT MANAG EM EN T CEN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

p)"~·EFl. p)"~·EFl. p.t '.G 1·, u.s. DEPARTlI'IENT OF ENERGY EE RE PROJECT MANAG EM EN T CEN T ER NEPA DETERlVIINATION RECIPIENT:Ohio Department of Development PROJECT TITLE: SEP ARRA - Sidco-Development Page 1 of3 ® STATE: OH Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number EE0000165 GFO-OO OOI65-030 GOO Based on my review of the infonnation concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

100

U.S. DEP.-illTUENT OF ENERGY EERE PROJECT MA"AG EM ENT CEN T  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

illTUENT OF ENERGY illTUENT OF ENERGY EERE PROJECT MA"AG EM ENT CEN T ER NEPA DETERl\IINATION RECIPIENT:City of San Antonio PROJECT TITLE: City of San Antonio ARRA·EECBG * Activity #7 (S) Page 1 of2 STATE: TX Funding Opportunity Announcement Number 81.128 Procurement Instrument Number DE·EEOOOO970 NEPA Control Number cm Number o Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45 I. IA), I have made the followin g determination: CX, EA , EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

US. DFPARThITNT OFFNERGY EERE PROJECT MANAG EM ENT CENTER NFPA DFTElU\llNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DFPARThITNT OFFNERGY DFPARThITNT OFFNERGY EERE PROJECT MANAG EM ENT CENTER NFPA DFTElU\llNATION RECIPIENT:Advanced Magnet Lab, Inc. STATE: FL PROJECT TITLE: A Lightweight, Direct Drive, Fully Superconducting Generator for Large Wind Turbines Page lof3 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-FOA-Q000439 DE-EEOOO5140 GF()'{)()()S1 40-002 G05140 Based on my review orlbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4St.IA),. bave made the following determination: ex. EA, EIS APPENDIX AND NUMBE R: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and

102

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DEIERJ\lINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1.1I0:. 1.1I0:. U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DEIERJ\lINATION RECIPIENT:Energy and Geoscience Institute at the University of Utah PROJECf TITLE: Quantum Dot Tracers for Use in Engineered Geothermal Systems Page 1 of2 STATE: UT Funding Opportunity Announcement Number Procurement Instrument Numbu NEPA Control Number CID Number DE-FOA-EEOOOOO75 DE-EEOOO2768 GF0-10-354 0 Based on my Tn'icw oftbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Ordcr45I.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 83.6 Siting, construction (or modification), operation, and decommissioning of facilities for indoor bench-scale research projects and conventional laboratory operations (for example, preparation of chemical standards and sample analysis):

103

Report: Removal of EM Projects from the GAO High Risk List  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

staff. This will provide flexibility during project executions (resource analysis curve). Even if the acquisition delivery is adequately staffed, the need for on-call...

104

EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010  

Energy.gov (U.S. Department of Energy (DOE))

Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel.

105

Master Linguistique, apprentissage des langues, informatique  

E-Print Network (OSTI)

Master Linguistique, apprentissage des langues, informatique Formation dispensée par l'UFR Lettres > Formation continue Lieu de formation : Site Gergovia (Clermont-Ferrand) #12;Master Linguistique linguistique générale (syntaxe, sémantique, pragmatique). Dans la partie linguistique appliquée, elle s

Sart, Remi

106

EM-PDRI Manual  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT PROJECT DEFINITION RATING INDEX (EM*PDRI) MANUAL OFFICE OF PROJECT MANAGEMENT, EM-6 U.S. DEPARTMENT OF ENERGY FEBRUARY 2001 REVISION 1 EM*PDRI MANUAL FEBRUARY 2001 TABLE OF CONTENTS 1.0 Introduction/EM*PDRI Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 EM*PDRI Description/Development of Scoring System . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.1 EM*PDRI Rating Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.2 Rating Element Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.3 EM*PDRI Maturity Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.4 EM*PDRI Scoring Methodology (Scoring the Project) . . . . . . . . . . . . . . . . . . . . . 4 2.4.1 Scoring System Bases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.4.2 Project Score . . . . . . . . . . .

107

Second Line of Defense Master Spares Catalog  

SciTech Connect

This catalog is intended to be a comprehensive listing of repair parts, components, kits, and consumable items used on the equipment deployed at SLD sites worldwide. The catalog covers detection, CAS, network, ancillary equipment, and tools. The catalog is backed by a Master Parts Database which is used to generate the standard report views of the catalog. The master parts database is a relational database containing a record for every part in the master parts catalog along with supporting tables for normalizing fields in the records. The database also includes supporting queries, database maintenance forms, and reports.

Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

2012-11-20T23:59:59.000Z

108

Auxiliary/Master microprocessor CAMAC Crate Controller applications  

SciTech Connect

The need for further sophistication of an already complex serial CAMAC control system at Fermilab led to the development of an Auxilary/Master CAMAC Crate Controller. The controller contains a Motorola 6800 microprocessor, 2K bytes of RAM, and 8K bytes of PROM memory. Bussed dataway lines are time shared with CAMAC signals to provide memory expansion and direct addressing of peripheral devices without the need of external cabling. The Auxiliary/Master Crate Controller (A/MCC) can function as either a Master, i.e., stand alone, crate controller or as an Auxiliary controller to Fermilab's Serial Crate Controller (SCC). Two modules, one single- and one double-width, make up an A/ MCC. The microprocessor has one nonmaskable and one maskable vectored interrupt. Time sharing the dataway between SCC programmed and block transfer generated dataway cycles and A/MCC operations still allows a 99 percent microprocessor CPU busy time. Since the conception of the A/MCC, there has been an increasing number of control system-related projects proposed which would not have been possible or would have been very difficult to implement without such a device. The first such application now in use at Fermilab is a stand-alone control system for a mass spectrometer experiment in the Main Ring Internal Target Area. This application in addition to other proposed A/MCC applications, both stand-alone and auxiliary, is discussed. (auth)

Barsotti, E.

1975-01-01T23:59:59.000Z

109

Empirical Master Equations. Part I: Numerical Properties  

Science Conference Proceedings (OSTI)

In the atmospheric sciences, master equations are mainly used in a discrete time approximation to provide forecasts of the probability density function in a discretized phase space spanned by a few climate variables. The coefficients of an ...

Mauro Dall’Amico; Joseph Egger

2007-09-01T23:59:59.000Z

110

History and Legacy of the Sydney 2009 World Masters Games  

E-Print Network (OSTI)

Masters Games are different from other quadrennial games in that: · Allcompetitorswillcompeteasindividuals

University of Technology, Sydney

111

MASTER OF SCIENCE IN MOLECULAR BIOTECHNOLOGY The Master of Science program in molecular  

E-Print Network (OSTI)

MASTER OF SCIENCE IN MOLECULAR BIOTECHNOLOGY The Master of Science program in molecular at the University of Kansas Medical Center. Molecular Biotechnology Molecular Biotechnology involves the use and development of laboratory tech- niques to study and modify nucleic acids and proteins. Molecular biotechnology

Peterson, Blake R.

112

Master of Social Work Why a Master of Social Work at CSUF?  

E-Print Network (OSTI)

on Social Work Education (CSWE) · The only MSW program offered at a public university in Orange County the CSUF MSW Program · The mission of the newly developing Master of Social Work (MSW) program at CSUFMaster of Social Work At CSUF #12;Why a Master of Social Work at CSUF? · Accredited by the Council

de Lijser, Peter

113

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DETERMINATION DETERMINATION RECIPIENT:Mid-America Regional Council PROJECT TITLE: Solar Ready KC Page I of2 STATE: MO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DOE-FOA"(xx)()549 DE-EECKXl5694 GFO-OOO5694-OO1 0 Based on my review oflhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description : A 11 Technical advice and assistance to organizations Technical advice and planning assistance to intemationaJ, national, state, and local organizations. A9 Intennation gathering, analysis, and dissemination Information gathering (induding, but not limited to, literature surveys, inventories, site visits, and audits), data analysis

114

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

115

Title Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Project DE-FE0001808 Novel Oxygen Carriers For Coal-Fueled Chemical Looping Combustion Western Kentucky University Presenter: Dr. Yan Cao Institute for Combustion Science and Environmental Technology February 25, 2011 Project Participants * PIs: Dr. Wei-Ping Pan Dr. Yan Cao * Students: Ms. Wen Ying (Master student) Mr. Andy Wang (Undergraduate student) Mr. Yanwen Cui (Master student) Introduction (limit - 1 slide) * Background on the project * Anticipated benefits Solid Oxygen Carriers 1. Commercially accepted kinetics - coupling and potential uncoupling (free oxygen) 2. Thermal Stability, Lower degradation, and Lower Attrition loss 3. Favored thermodynamics for pure CO 2 4. Opportunity to release of free oxygen for improvement of process kinetics;

116

Global Change Master Directory | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Change Master Directory Global Change Master Directory Energy Data Apps Maps Challenges Resources Blogs Let's Talk Energy Beta You are here Data.gov » Communities » Energy » Data Global Change Master Directory Dataset Summary Description The GCMD database holds more than 30,000 descriptions of Earth science data sets and services covering all aspects of Earth and environmental sciences. Tags {Agriculture,atmosphere,biosphere,bilogy,climate,cryosphere,"land surface",oceans,paleoclimate,"solid Earth",Sun,"terrestrial hydrosphere",NASA,GSFC,"Goddard Space Flight Center"} Dataset Ratings Overall 0 No votes yet Data Utility 0 No votes yet Usefulness 0 No votes yet Ease of Access 0 No votes yet Dataset Additional Information Last Updated 01-Jan-2010 Publisher National Aeronautics and Space Administration

117

SteamMaster: Steam System Analysis Software  

E-Print Network (OSTI)

As director of Oregon's Industrial Assessment Center, I have encountered many industrial steam systems during plant visits. We analyze steam systems and make recommendations to improve system efficiency. In nearly 400 industrial assessments, we have recommended 210 steam system improvements, excluding heat recovery, that would save $1.5 million/year with a 0.4-year payback. 75% of those recommendations have been implemented for $1.1 million annual savings with 0.3-year payback. Recently I have developed a tool to facilitate the process. SteamMaster is based on an Excel spreadsheet with a Visual Basic interface to simplify system modeling and analysis. SteamMaster has many features and capabilities, including energy and cost savings calculations for five steam recommendations. This presentation will demonstrate SteamMaster software applied to one or more industrial steam systems. Software will be made available on a national web site at no cost.

Wheeler, G.

2003-05-01T23:59:59.000Z

118

Precision manufacture of optical disc master stampers  

E-Print Network (OSTI)

industry term for the mold used to replicate polymer compact discs (CDs) in an injection molding device are not required, and a ceramic master is used directly as a stamper for injection molding. In the new process, ceramic substrates are ion machined through a photoresist mask, resulting in improved productivity

Bifano, Thomas

119

Master of Science Thesis Stockholm, Sweden 2006  

E-Print Network (OSTI)

Access in Disaster Emergency Response KTH Information and Communication Technology #12;Broadband Wireless Access in Disaster Emergency Response Royal Institute of Technology (KTH) Stockholm, Sweden May 18th Wireless Access in Disaster and Emergency Response Xin Bai Master of Science Thesis Stockholm, Sweden 2006

Maguire Jr., Gerald Q.

120

Master of International Public Affairs Degree Program  

E-Print Network (OSTI)

and energy policy, corruption, public management, tax policy and government finance, education funding Law (Juris Doctorate) u Master of Science in Urban and Regional Planning u Energy Analysis and Policy. Alumni have held positions with these agencies and businesses: u American Red Cross u CARE in Afghanistan

Sheridan, Jennifer

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Description of master thesis Robotic transportation  

E-Print Network (OSTI)

Description of master thesis Robotic transportation Jan Holdgaard-Thomsen & Søren Markersen In hospitals a significant amount of resources is spent on transportation of goods, e.g. blood samples, medicine, food, and trash. Usually these transportation tasks are carried out by humans. A current research

Bolander, Thomas

122

Latin square three dimensional gage master  

DOE Patents (OSTI)

A gage master for coordinate measuring machines has an nxn array of objects distributed in the Z coordinate utilizing the concept of a Latin square experimental design. Using analysis of variance techniques, the invention may be used to identify sources of error in machine geometry and quantify machine accuracy.

Jones, Lynn L. (Lexena, KS)

1982-01-01T23:59:59.000Z

123

Windows Enterprise Design Master Directory Sources  

E-Print Network (OSTI)

Windows Enterprise Design Master Directory Sources September 29, 2003 Active Directory information for Windows users contains several pieces of information to identify the person associated with a Windows in Windows Active Directory. It is important the information correctly reflects your current name

Simpkins, William W.

124

Master Thesis: Fusion Plasma Thermal Transport  

E-Print Network (OSTI)

Master Thesis: Fusion Plasma Thermal Transport Radial and Poloidal Profile Modeling Martin Olesen-axis localised ion cyclotron resonance heating source. 2. Cold pulse shock induction at the plasma edge via laser wave propagation from heat modulation and the fast propagation of a cold pulse, at the same plasma

125

Implementing an agricultural water conservation innovation among the urban public: an analysis of the pilot study phase of the San Antonio Evapotranspiration Project--a cooperative effort between the Texas Agricultural Extension Service--Bexar County Offices, Bexar County Master Gardeners, San Antonio Water Systems and Texas A&M University  

E-Print Network (OSTI)

Increasing urbanization in this country continues to present many challenges and opportunities to education and research institutions, agribusiness, and public and private service agencies. These challenges have propelled the invention of countless innovations which, though perhaps originally intended for addressing rural agricultural dilemmas, eventually are transferred into the urban context to address different problems. One such technological innovation, which was originally aimed at addressing a rural agronomic problem, is being put to use in a creative manner in an urban setting. This innovation, first used to determine-nine accurate soil moisture need for semi-arid land crops, is potential-evapotranspiration (PET) data based irrigation scheduling. Allocation of water resources is an environmental issue that has become a regular element in immediate and long-term program agendas of organizations concerned with the future sutainability of agriculture in Bexar county. There is some argument about the wisest uses of it. Most agree, though, and regional studies are supportive, that one of the uses, turf irrigation, without a doubt needs to be managed more wisely. It is estimated that 40% of the municipal water is used to irrigate turf in the summer in San Antonio. Presently, recommendations for efficient application of water to turf, though specific and descriptive, rely ultimately upon the subjective evaluation of the irrigator. There are many lawn watering philosophies, most of which are not water efficient. Each turf variety has different water requirements. There is a profound need for taking the guesswork out of irrigating lawns. The Bexar County Office of the Texas Agricultural Extension Service actively promotes environmental stewardship" in its educational programs (Highlights, 1996). In Bexar County, one important aspect of sound environmental stewardship is to promote water conservation. One way this agency is currently carrying out this particular part of its mission is through a project that uses the evapotranpiration data technology mentioned above and promotes better understanding and application of water conservation measures in urban lawn irrigation practices. The project is a cooperative effort between San Antonio Water System (SAWS), The Texas Agricultural Extension Service in Bexar County, Texas A&M University (Department of Agricultural engineering), and the Bexar County Master Gardeners, Inc. Part of the overall project is a pilot study being conducted to test the best way of applying this water conservation method to irrigate lawns. Participants in this pilot study are residents of San Antonio and the surrounding area who have agreed to follow certain watering and lawncare protocol instructions, in exchange for free lawn fertilizer for the duration of participation, and priority status with Extension Agents when lawncare questions arise. There are many challenges that the project staff and participants must face in implementing this study if it is to be successful and provide adequate data to convince the general public to adopt this innovation. Conclusions regarding the nature and effectiveness of the project include that excellent communication between staff and participants, teamwork among staff and participant leaders, and a knowledge of the principles behind the adoption process during the remainder of the pilot study phase are essential to success of latter phases and effective adoption of this water conservation method on a larger scale. Reactions by participants, who have been involved in the implemetation of this pilot study to date, are encouraging. The positive consequences so far of educating and enabling only a very small group of citizens may indicate the potentially huge impact this project could have on large scale water conservation in Bexar County. iii

Reilly, Laura Lynne

1998-01-01T23:59:59.000Z

126

McMASTER SECURITY SERVICES ANNUAL REPORT 2006  

E-Print Network (OSTI)

McMASTER SECURITY SERVICES ANNUAL REPORT 2006 Making McMaster a safe place to work, live, learn 1 CPTED Ontario Conference ­ Oshawa 1 Diversity Education 19 Due Diligence Training 5 Front Line

Thompson, Michael

127

McMASTER SECURITY SERVICES ANNUAL REPORT 2005  

E-Print Network (OSTI)

McMASTER SECURITY SERVICES ANNUAL REPORT 2005 Making McMaster a safe place to work, live and learn Training Front Line Officers ­ HPS 4 OACUSA Annual Conference 3 OACUSA Security Officer Training

Thompson, Michael

128

Pushing Boundaries on Performance & Design: the ClimateMaster...  

NLE Websites -- All DOE Office Websites (Extended Search)

Boundaries on Performance & Design: the ClimateMaster Trilogy 40 Q-Mode(tm) Geothermal Heat Pump August 01, 2013 The ClimateMaster Trilogy 40 Q-Mode(tm) Geothermal Heat...

129

Recent Doctoral Dissertations and Masters Reports  

E-Print Network (OSTI)

health and EMS agencies are participating together on inter-organizational andhealth and hospital trade associations have called for community inter­ organizationalhealth and EMS agen­ cies are collaborating to develop inter-organizational

Students, DCRP

2005-01-01T23:59:59.000Z

130

EM Press Releases | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 11, 2013 July 11, 2013 DOE Awards Task Order for Disposal of Los Alamos National Laboratory Waste Cincinnati - The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed Low-Level Waste Disposal Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract. July 9, 2013 Hanford Landfill Reaches 15 Million Tons Disposed - Waste Disposal Mark Shows Success Cleaning Up River Corridor RICHLAND, Wash. - The U.S. Department of Energy (DOE) and its contractors have disposed of 15 million tons of contaminated material at the Environmental Restoration Disposal Facility (ERDF) since the facility began

131

EM-1 Related Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(8-89) EFG (07-90) United States Government Department of Energy DATE: February 12, 2001 REPLY TO ATTN OF: EM-6 (D. Pepson, 301-903-7432) SUBJECT: Environmental Management-Project Definition Rating Index TO: Distribution In March 2000, the Environmental Management-Project Definition Rating Index (EM-PDRI) was directed for use in EM to enhance our up-front project planning process. Revision 1 of the EM-PDRI, which incorporates the requirements of DOE Order, 413.3, Program and Project Management for the Acquisition of Capital Assets is now being issued. As in the past, EM- PDRI scores must be provided for Critical Decisions (CDs) for all Capital Asset Projects prior to construction/remediation (i.e., all CDs other than CD-4). Attachment 1 shows the CDs for each type of EM project and the expected EM-PDRI score for

132

Project Definition Rating Index (PDRI)  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for...

133

Microsoft PowerPoint - EM SSAB Chairs Webinar - (2) Huizenga...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management April 25, 2013 Click to edit Master title style Environmental Cleanup-a Key DOE Strategic Goal EM's mission is to complete the safe cleanup of the environmental legacy...

134

Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction  

SciTech Connect

Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific, organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.

Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

1993-12-01T23:59:59.000Z

135

Stochastic Master Equations in Thermal Environment  

E-Print Network (OSTI)

We derive the stochastic master equations which describe the evolution of open quantum systems in contact with a heat bath and undergoing indirect measurements. These equations are obtained as a limit of a quantum repeated measurement model where we consider a small system in contact with an infinite chain at positive temperature. At zero temperature it is well-known that one obtains stochastic differential equations of jump-diffusion type. At strictly positive temperature, we show that only pure diffusion type equations are relevant.

S Attal; C Pellegrini

2010-04-20T23:59:59.000Z

136

An evaluation of the 4-H master livestock volunteer program in Texas  

E-Print Network (OSTI)

The purpose of this study was to assess the perceptions of Master Livestock Volunteer program participants regarding the effectiveness of the program, their role in the county 4-H volunteer program, and the role of various stakeholders in livestock project decision making. A census was attempted of the 242 possible participants. Using recommendations from Dillman (2000), master volunteers were contacted by email if available and via mailed questionnaire. This process yielded a 38% response rate. Follow-up methods increased the response rate to 52.4%. The volunteers indicated the programs was of high importance and effective. Findings included that volunteers perceived their most influence came in the selection of feeds. The educator role was the one most involved in the decision making process of the livestock projects, followed by the manager role, leader role, and various servant-type leadership roles. Volunteers ranked stakeholders' influence on livestock project decisions, with the youth and the parents as most influential followed by the CEA, the volunteer, and the breeder. The average participant reported nine years of overall volunteer service and two years of service as a Master Livestock Volunteer. Participants in this study were between 38 and 47 years of age.

Smith, Joe Douglas

2008-08-01T23:59:59.000Z

137

EM-20 ISD Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Experience & Lessons Learned Project Experience & Lessons Learned for In Situ Decommissioning Prepared By U.S. Department of Energy Office of Environmental Management Office of D&D and FE, EM-13 This page is deliberately blank. DOE EM Project Experience for In Situ Decommissioning i Contents Acronyms .................................................................................................................................................... vii 1. Introduction ..................................................................................................................................... 1 1.1 Background ................................................................................................................................... 1 1.2 Purpose ......................................................................................................................................... 2

138

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

139

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations  

SciTech Connect

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

2010-01-01T23:59:59.000Z

140

panavi: recipe medium with a sensors-embedded pan for domestic users to master professional culinary arts  

Science Conference Proceedings (OSTI)

"panavi," a recipe medium, supports cooking experience for domestic users to master professional culinary arts in their kitchens by managing temperature and pan movement properly. Utilizing a sensors-embedded frying pan--providing projected images, LED ... Keywords: cooking, interaction design, kitchen, research through design, situated actions, ubiquitous computing

Daisuke Uriu; Mizuki Namai; Satoru Tokuhisa; Ryo Kashiwagi; Masahiko Inami; Naohito Okude

2012-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Microsoft PowerPoint - EM SSAB Chairs Webinar - (2) Huizenga EM Program Update for SSAB Chairs.042513  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chairs' Webinar Chairs' Webinar www.energy.gov/EM 1 David Huizenga Senior Advisor for the Office of Environmental Management April 25, 2013 Click to edit Master title style Environmental Cleanup-a Key DOE Strategic Goal EM's mission is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. EM supports DOE Strategic Goal #3: Click to edit Master subtitle style www.energy.gov/EM 2 EM supports DOE Strategic Goal #3: "Enhance nuclear security through defense, nonproliferation, and environmental efforts." The budget positions the EM program to meet all its FY 2014 enforceable cleanup milestones. Click to edit Master title style Sites Remaining in 2012

142

Draft SPD SEIS Master Reference List | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

SPD SEIS Master Reference List | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

143

Building Energy Software Tools Directory: MotorMaster+  

NLE Websites -- All DOE Office Websites (Extended Search)

implement an effective energy management program. MotorMaster+ contains a motor inventory module, where motor nameplate data is stored and linked to utility, facility, plant...

144

Oil and Gas Field Code Master List 1998  

U.S. Energy Information Administration (EIA)

Front Matter. Cover Page, Preface, Contents, Chapters, Maps and the Glossary: PDF.. Oil and Gas Field Code Master List. Field code information for all ...

145

EM Contributes Expertise to Comprehensive Resource on Managing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects October 30, 2013 -...

146

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

147

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

148

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A This metric has been overcome by events. Beginning in FY10, EM projects are to be measured against metric #1 above. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12,

149

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

150

A MASTER FORMULA FOR CHIRAL SYMMETRY BREAKING  

E-Print Network (OSTI)

We derive a master formula for chiral $SU(2)\\times SU(2)$ breaking, based on the Veltman-Bell equations and the Peierls-Dyson relation. Our approach does not rely on the use of the soft pion limit or an expansion around the chiral limit, and yields exact results for on-shell pions. Threshold theorems for $\\pi N\\rightarrow \\pi N$, $\\gamma N\\rightarrow \\pi N$, $\\pi N\\rightarrow\\pi\\pi N$, $\\gamma N\\rightarrow \\gamma\\pi N$, $\\gamma N\\rightarrow \\pi\\pi N$ and $\\pi N\\rightarrow \\pi\\gamma N$ are recovered, and corrections to them are given. The reactions $\\pi\\rightarrow e\

HIDENAGA YAMAGISHI; ISMAIL ZAHED

1995-03-22T23:59:59.000Z

151

Master environmental plan for Fort Devens, Massachusetts  

SciTech Connect

Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

1991-11-01T23:59:59.000Z

152

Modulhandbuch Master-Studiengang Biochemie BCM P 04 ,,Biophysikalische Chemie"  

E-Print Network (OSTI)

Modulhandbuch Master-Studiengang Biochemie BCM P 04 ,,Biophysikalische Chemie" Studiengang Master Studiengang Biochemie Modul-Code: BCM P 04 Modulbezeichnung Biophysikalische Chemie Art der Lehrveranstaltung / SWS V Biophysikalische Chemie (2 SWS) Ã? Biophysikalische Chemie (1 SWS) P Biophysikalische Chemie (7

Manstein, Dietmar J.

153

Master of Social Work Program Application Instructions for Fall 2012  

E-Print Network (OSTI)

Master of Social Work Program Application Instructions for Fall 2012 Admission Admission to the Master of Social Work (MSW) program is limited to the Fall semester only. Application materials may-year program. The full-time MSW program is administered by the Department of Social Work and delivered

de Lijser, Peter

154

Master of Social Work Program Application Instructions for Fall 2011  

E-Print Network (OSTI)

Master of Social Work Program Application Instructions for Fall 2011 Admission Admission to the Master of Social Work (MSW) program is limited to the Fall semester only. Application materials may-year program. The full-time MSW program is administered by the Department of Social Work and delivered

de Lijser, Peter

155

Master of Social Work Program Application Instructions for Fall 2013  

E-Print Network (OSTI)

Master of Social Work Program Application Instructions for Fall 2013 Admission Admission to the Master of Social Work (MSW) program is limited to the Fall semester only. Application materials may by the Department of Social Work; all classes are conducted on Fullerton's main campus. The MSW program (3 year

de Lijser, Peter

156

Master Plan and Energy Audits at a Large Texas Medical Campus  

E-Print Network (OSTI)

Energy Engineering Associates, Inc. was engaged by the Facilities Resource Management Department at a large medical center in Houston, TX to assist with the development of an Energy Management Master Plan and subsequent individual Detailed Building Energy Audits. The Master Plan summarized our methodology for disaggregation of historical energy use by building and end use. We also defined our proposed system for prioritizing buildings for the individual Detailed Building Energy Audits. We proposed a 5-year plan of action to complete detailed audits of existing building inventory and complete energy efficiency retrofit projects to achieve 32 percent reduction in total energy use. The Master Plan called for maximizing incentive payments from the local electric service provider, and for targeting the maximum available funds over the 5-year period. To maximize the return on investment in energy efficiency, the manpower and financial resources were targeted toward the best projects. EEA developed a strategy to assess the current performance of the buildings by evaluating historical utility consumption and building infrastructure data. The energy efficiency targets or benchmarks were established for each building based upon relevant variables. Finally, an analysis of the current performance versus targeted performance was made to define the gap between current usage and targeted efficiency level. Baseline energy consumption models were developed for most of the buildings based upon the HVAC system type installed in the facility. The “Bin Temperature” model calculated the cooling and heating requirements for the buildings based upon local Houston weather data and operating schedule assumptions for lighting and internal loads. The assumptions for internal loads and lighting were calibrated with short term building sub-meter data. Daily and weekly schedule assumptions were verified and total internal loads defined by the meter information. The types of energy savings projects were categorized into the following six groups: 1. Hot Deck Fans 2. Heat Recovery 3. Variable Ventilation 4. Central Plant Projects 5. Commissioning and Controls 6. Lighting Projects

Simpson, K.; Stinson, M.; Haag, S.; Hart, M.

2009-11-01T23:59:59.000Z

157

Oil and Gas Field Code Master List 1996 Updates  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List Updates 1996 represents a departure from past Energy Information Administration (EIA) practice. This publication does not provide a list of all identified oil and gas fields in the United States as did the fourteen prior annual volumes of the Oil and Gas Field Code Master List. It provides updates to the Field Code Master File that were made subsequent to the publication of Oil and Gas Field Code Master List 1995, based on information collected through October 1996. These updates represent the addition of new fields to the list and changes to the records of previously listed fields, including deletions. This publication is therefore a supplement to theOil and Gas Field Code Master List 1995, which its recipients were requested to retain.

Robert F. King

1996-12-01T23:59:59.000Z

158

DEP.-\RTUENT OF ENERG Y EERE PROJECT MANAG EM ENT CENTER NEP.-I. DETEIU.lIN.-I.TION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-\RTUENT OF ENERG Y -\RTUENT OF ENERG Y EERE PROJECT MANAG EM ENT CENTER NEP.-I. DETEIU.lIN.-I.TION Page 1 of2 RECIPIENT:Govemor's Energy Office STATE: CO PROJECf TITLE: COLORADO SEP ARRA - Geothermal Power Direct Use Grant - Town of Rico Funding Opportunity Announcement Number OE-FOA-OOOOO52 Procurement Instrument Number DE-EE0000082 NEPA Control Number GF0..()()()()()82 -009 elD Number o Based on my review of the inCormation concerning the proposed action, as N[PA Compliance Officer (authorized under DOE Order 451.1;\), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A 11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including

159

ORCWM test and evaluaton master plan. Revision 00  

SciTech Connect

The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T&E) policy, objectives, requirements, general methodology (test flow and description of each T&E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T&E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T&E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T&E supports the overall systems engineering process.

NONE

1995-08-01T23:59:59.000Z

160

Coho Salmon Master Plan, Clearwater River Basin.  

DOE Green Energy (OSTI)

The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these uncertainties, the Nez Perce Tribe proposes to utilize a phased approach for coho reintroductions. This Master Plan seeks authorization and funding to move forward to Step 2 in the Northwest Power and Conservation Council 3-Step review process to further evaluate Phase I of the coho reintroduction program, which would focus on the establishment of a localized coho salmon stock capable of enduring the migration to the Clearwater River subbasin. To achieve this goal, the Nez Perce Tribe proposes to utilize space at existing Clearwater River subbasin hatchery facilities in concert with the construction of two low-tech acclimation facilities, to capitalize on the higher survival observed for acclimated versus direct stream released coho. In addition, Phase I would document the natural productivity of localized coho salmon released in two targeted tributaries within the Clearwater River subbasin. If Phase I is successful at establishing a localized coho salmon stock in an abundance capable of filling existing hatchery space, the rates of natural productivity are promising, and the interspecific interactions between coho and sympatric resident and anadromous salmonids are deemed acceptable, then Phase II would be triggered. Phase II of the coho reintroduction plan would focus on establishing natural production in a number of Clearwater River subbasin tributaries. To accomplish this goal, Phase II would utilize existing Clearwater River subbasin hatchery facilities, and expand facilities at the Nez Perce Tribal Hatchery Site 1705 facility to rear approximately 687,700 smolts annually for use in a rotating supplementation schedule. In short, this document identifies a proposed alternative (Phase I), complete with estimates of capital, operations and maintenance, monitoring and evaluation, and permitting that is anticipated to raise average smolt replacement rates from 0.73 (current) to 1.14 using primarily existing facilities, with a limited capital investment for low-tech acclimation facilities. This increase in survival is expected to provide the opportunity for the establishm

Nez Perce Tribe; FishPro

2004-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Plant Process Computer Replacement to Support Distributed Process Control: Joint STPNOC-EPRI Distributed Plant Process Computer Syst em Project  

Science Conference Proceedings (OSTI)

Concerns exist that nuclear power plant process computer systems are becoming obsolete and do not have the infrastructure to support new processes such as digital process control upgrades. To address these concerns, a distributed plant process computer system was designed and implemented at the South Texas Project Nuclear Operating Company Units 1 and 2. Implementing this new system and its associated plant networks, if done correctly, will facilitate future control and information system upgrades that c...

2001-11-16T23:59:59.000Z

162

Microsoft Word - FONSI master.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1591 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. BPA has prepared an environmental assessment (DOE/EA-1591) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

163

Oil and Gas Field Code Master List - Energy Information Administration  

U.S. Energy Information Administration (EIA) Indexed Site

Oil and Gas Field Code Master List Oil and Gas Field Code Master List With Data for 2012 | Release Date: May 8, 2013 | Next Release Date: April 2014 Previous Issues Year: 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1998 1997 1996 1995 Go Comprehensive listing of U.S. oil and gas field names. Oil and Gas Field Code Master List 2012 Definition of a Field Afield is defined as "an area consisting of a single reservoir ormultiple reservoirs all grouped on, or related to, the same individual geological structural feature and/or stratigraphic condition. There may be two or more reservoirs in a field which are separated vertically by intervening impervious strata, or laterally by local geologic barriers, or by both." More › About the Field Code Master List Related Links

164

Kelly McMasters, Brookhaven Statement on Shirley Memoir, Welcome...  

NLE Websites -- All DOE Office Websites (Extended Search)

Regarding Claims in 'Shirley' Memoir and 'Atomic States' Film Kelly McMaster's 2008 book, "Welcome to Shirley: A Memoir from an Atomic Town" presents an often-inaccurate...

165

MASTER OF SCIENCE IN ANALYTICS CLASS OF 2013  

E-Print Network (OSTI)

was responsible for selling enterprise- level business intelligence solutions as well residents: 61 Number of countries of origin: 13 States of residency (14): AZ North Carolina State University, Institute for Advanced Analytics Master

Liu, Paul

166

Kelly McMasters, Brookhaven Statement on Shirley Memoir, Welcome...  

NLE Websites -- All DOE Office Websites (Extended Search)

Statement on 'Shirley' Memoir Kelly McMasters has published a book about growing up in Shirley, New York, in a neighborhood about 6 miles south of Brookhaven National Laboratory....

167

Oil and Gas Field Code Master List 2006  

U.S. Energy Information Administration (EIA)

Preface The Oil and Gas Field Code Master List 2006 is the twenty-fifth annual listing of all identified oil and gas fields in the United States. It ...

168

Microsoft Word - Revison Sheet master.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1591 Bonneville Power Administration May 2008 Revision Sheet for the Palisades-Goshen Transmission Line Reconstruction Project Final Environmental Assessment DOE/EA -1591 Summary This revision sheet documents the changes incorporated into the Palisades-Goshen Transmission Line Reconstruction Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and serves as the Final EA. On April 23, 2008, the Preliminary EA was sent to agencies and interested parties. Notification that the EA was available and how to request a copy was sent to all others on the mailing list of

169

Oil and Gas Field Code Master List 1998 Updates  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List Updates 1998 is an addendum to the 1997 edition of the EIA publication Oil and Gas Field Code Master List, an annual listing of all identified oil and gas fields in the United States. These updates represent the addition of new fields to the list and changes to the records of previously listed fields, including deletions. The current publication is based on field information collected through October 1998.

Robert F. King

1999-01-01T23:59:59.000Z

170

Oil and Gas Field Code Master List 1999 Updates  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List Updates 1999 is an addendum to the 1998 edition of the EIA publication Oil and Gas Field Code Master List, an annual listing of all identified oil and gas fields in the United States. These updates represent the addition of new fields to the list and changes to the records of previously listed fields, including deletions. The current publication is based on field information collected through November 1999.

Robert F. King

2000-01-01T23:59:59.000Z

171

Oil and gas field code master list, 1993  

Science Conference Proceedings (OSTI)

This document contains data collected through October 1993 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. Other Federal and State government agencies, as well as industry, use the EIA Oil and Gas Field Code Master List as the standard for field identification. A machine-readable version of the Oil and Gas Field Code Master List is available from the National Technical Information Service.

Not Available

1993-12-16T23:59:59.000Z

172

U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NEPA DFTFRlIllNAIION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DFTFRlIllNAIION DFTFRlIllNAIION Page I of2 REel PI ENT:Govemor's Energy Office STATE: CO PROJEC.T TITLE: COLORADO SEP ARRA - Geothermal Power Direct Use Grant - City of Ouray Funding Opportunity Announcement Number DE-FOA-OOOOOS2 0 Proc:uumenl Instrument Number DE-EE0000082 NEPA Control Number GF0.00Q0082-008 cm Number o Ba~d on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description : 85.1 Actions to conserve energy. demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially hannful substances. These actions may involve financial and technical

173

McMaster Learning Portfolio Terms of Use July 31, 2013  

E-Print Network (OSTI)

McMaster Learning Portfolio Terms of Use July 31, 2013 Thank you for visiting the Learning Portfolio website (the "Website") of McMaster University ("McMaster"). McMaster has established these Terms of Use ("Terms") to ensure that the Website is useful, safe for everyone and provides a valuable resource

Hitchcock, Adam P.

174

Microsoft PowerPoint - EM QA Corporate Board Slides (December...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM QAP). * Documented Project Quality Assurance strategies essential (particularly DOE O 413 projects) * Supply chain oversight planning * Project QA internal auditsurveillance...

175

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

176

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

177

Turning Numbers into Knowledge: Mastering the Art of Problem Solving  

NLE Websites -- All DOE Office Websites (Extended Search)

Turning Numbers into Knowledge: Mastering the Art of Problem Solving Turning Numbers into Knowledge: Mastering the Art of Problem Solving Speaker(s): Jonathan Koomey Date: February 12, 2002 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: David Faulkner In this talk, Jonathan Koomey, Staff Scientist and Group Leader in the End-use Forecasting Group, will summarize key "tricks of the trade" summarized in his new book "Turning Numbers into Knowledge: Mastering the Art of Problem Solving". The book focuses on many lessons relevant to working effectively in the research world, including being prepared, creating appropriate documentation, doing back of the envelope calculations, and making good tables and graphs. For more details, check out the book's web site at: http://www.numbersintoknowledge.com

178

Oil and Gas Field Code Master List 1990  

Science Conference Proceedings (OSTI)

This is the ninth annual edition of the Energy Information Administration's (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1990 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. There are 54,963 field records in this year's Oil and Gas Field Code Master List (FCML). This amounts to 467 more than in last year's report. As it is maintained by EIA, the Master List includes: Field records for each state and county in which a field resides; field records for each offshore area block in the Gulf of Mexico in which a field resides;field records for each alias field name; fields crossing state boundaries that may be assigned different names by the respective state naming authorities.

Not Available

1991-01-04T23:59:59.000Z

179

Nonlinear thermodynamic quantum master equation: Properties and examples  

Science Conference Proceedings (OSTI)

The quantum master equation obtained from two different thermodynamic arguments is seriously nonlinear. We argue that, for quantum systems, nonlinearity occurs naturally in the step from reversible to irreversible equations and we analyze the nature and consequences of the nonlinear contribution. The thermodynamic nonlinearity naturally leads to canonical equilibrium solutions and extends the range of validity to lower temperatures. We discuss the Markovian character of the thermodynamic quantum master equation and introduce a solution strategy based on coupled evolution equations for the eigenstates and eigenvalues of the density matrix. The general ideas are illustrated for the two-level system and for the damped harmonic oscillator. Several conceptual implications of the nonlinearity of the thermodynamic quantum master equation are pointed out, including the absence of a Heisenberg picture and the resulting difficulties with defining multitime correlations.

Oettinger, Hans Christian [ETH Zuerich, Department of Materials, Polymer Physics, HCI H 543, CH-8093 Zuerich (Switzerland)

2010-11-15T23:59:59.000Z

180

Oil and gas field code master list 1994  

SciTech Connect

This is the thirteenth annual edition of the Energy Information Administration`s (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1994 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. The master field name spellings and codes are to be used by respondents when filing the following Department of Energy (DOE) forms: Form EIA-23, {open_quotes}Annual Survey of Domestic Oil and Gas Reserves,{close_quotes} filed by oil and gas well operators (field codes are required from larger operators only); Forms FERC 8 and EIA-191, {open_quotes}Underground Gas Storage Report,{close_quotes} filed by natural gas producers and distributors who operate underground natural gas storage facilities. Other Federal and State government agencies, as well as industry, use the EIA Oil and Gas Field Code Master List as the standard for field identification. A machine-readable version of the Oil and Gas Field Code Master List is available from the National Technical Information Service, 5285 Port Royal Road, Springfield, Virginia 22161, (703) 487-4650. In order for the Master List to be useful, it must be accurate and remain current. To accomplish this, EIA constantly reviews and revises this list. The EIA welcomes all comments, corrections, and additions to the Master List. All such information should be given to the EIA Field Code Coordinator at (214) 953-1858. EIA gratefully acknowledges the assistance provides by numerous State organizations and trade associations in verifying the existence of fields and their official nomenclature.

Not Available

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

THE BNL ASTD FIELD LAB - NEAR - REAL - TIME CHARACTERIZATION OF BNL STOCKPILED SOILS TO ACCELERATE COMPLETION OF THE EM CHEMICAL HOLES PROJECT.  

SciTech Connect

As of October 2001, approximately 7,000 yd{sup 3} of stockpiled soil remained at Brookhaven National Laboratory (BNL) after the remediation of the BNL Chemical/Animal/Glass Pits disposal area. The soils were originally contaminated with radioactive materials and heavy metals, depending on what materials had been interred in the pits, and how the pits were excavated. During the 1997 removal action, the more hazardous/radioactive materials were segregated, along with, chemical liquids and solids, animal carcasses, intact gas cylinders, and a large quantity of metal and glass debris. Nearly all of these materials have been disposed of. In order to ensure that all debris was removed and to characterize the large quantity of heterogeneous soil, BNL initiated an extended sorting, segregation, and characterization project directed at the remaining soil stockpiles. The project was co-funded by the Department of Energy Environmental Management Office (DOE EM) through the BNL Environmental Restoration program and through the DOE EM Office of Science and Technology Accelerated Site Technology Deployment (ASTD) program. The focus was to remove any non-conforming items, and to assure that mercury and radioactive contaminant levels were within acceptable limits for disposal as low-level radioactive waste. Soils with mercury concentrations above allowable levels would be separated for disposal as mixed waste. Sorting and segregation were conducted simultaneously. Large stockpiles (ranging from 150 to 1,200 yd{sup 3}) were subdivided into manageable 20 yd{sup 3} units after powered vibratory screening. The 1/2-inch screen removed almost all non-conforming items (plus some gravel). Non-conforming items were separated for further characterization. Soil that passed through the screen was also visually inspected before being moved to a 20 yd{sup 3} ''subpile.'' Eight samples from each subpile were collected after establishing a grid of four quadrants: north, east, south and west, and two layers: top and bottom. Field personnel collected eight 100-gram samples, plus quality assurance (QA) duplicates for chemical analysis, and a 1-liter jar of material for gamma spectroscopy. After analyses were completed and reviewed, the stockpiles were reconstructed for later disposal as discrete entities within a disposal site profile. A field lab was set up in a trailer close to the stockpile site, equipped with instrumentation to test for mercury, RCRA metals, and gamma spectroscopy, and a tumbler for carrying out a modified Toxicity Characteristic Leaching Procedure (TCLP) protocol. Chemical analysis included X-ray fluorescence (XRF) to screen for high (>260 ppm) total mercury concentrations, and modified TCLP tests to verify that the soils were not RCRA hazardous. The modified TCLP tests were 1/10th scale, to minimize secondary (leachate) waste and maximize tumbler capacity and sampler throughput. TCLP leachate analysis was accomplished using a Milestone Direct Mercury Analyzer (DMA80). Gamma spectroscopy provided added assurance of previously measured Am-241, Cs-137, and Co-60 contamination levels.

BOWERMAN,B.S.; ADAMS,J.W.; HEISER,J.; KALB,P.D.; LOCKWOOD,A.

2003-04-01T23:59:59.000Z

182

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

183

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

184

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

185

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

186

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

187

Latin-square three-dimensional gage master  

DOE Patents (OSTI)

A gage master for coordinate measuring machines has an nxn array of objects distributed in the Z coordinate utilizing the concept of a Latin square experimental design. Using analysis of variance techniques, the invention may be used to identify sources of error in machine geometry and quantify machine accuracy.

Jones, L.

1981-05-12T23:59:59.000Z

188

MHK Technologies/WaveMaster | Open Energy Information  

Open Energy Info (EERE)

WaveMaster WaveMaster < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage WaveMaster.jpg Technology Profile Primary Organization Ocean Wavemaster Ltd Technology Resource Click here Wave Technology Type Click here Point Absorber - Submerged Technology Readiness Level Click here TRL 1 3 Discovery Concept Def Early Stage Dev Design Engineering Technology Description The WaveMaster device consists of two pressure chambers connected via a number of turbines The device is located under the waters surface so that it is covered at all times The upper surface of each chamber is an active surface covered with one way valves that control the flow of water through the device The valves on the high pressure chamber allow water to flow into the chamber provided the external pressure is higher than the internal pressure in the chamber This situation typically occurs under wave crests If the external pressure is less than the internal pressure the valves remain closed and water does not flow in Similarly the valves on the low pressure chamber will only allow water to flow out of the chamber if the internal pressure is higher than the external pressure This situation typically occurs under wave troughs If the internal pressure is less than the external pressure the valves remain closed and there is no flow of water

189

Oil and Gas Field Code Master List 1995  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List 1995 is the fourteenth annual listing of all identified oil and gasfields in the United States. It is updated with field information collected through October 1995. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry.

Robert F. King

1995-12-01T23:59:59.000Z

190

Oil and Gas Field Code Master List 1996  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List 1996 is the fifteenth annual listing of all identified oil and gasfields in the United States. It is updated with field information collected through October 1996. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry.

Robert F. King

1996-12-01T23:59:59.000Z

191

Master Thesis Ring Imaging Cerenkov Counter with Aerogel  

E-Print Network (OSTI)

[a4]report #12; i Master Thesis Ring Imaging Cerenkov Counter with Aerogel Radiator for HERMES-inlusive spin asymmetries. In the past, HERMES used a threshold Cerenkov counter as one of its four particle the threshold Cerenkov counter with a Ring Imaging Cerenkov system(RICH) in 1998, so that it can separate #25

192

Delft University of Technology Master's Thesis in Computer Engineering  

E-Print Network (OSTI)

for Smartphone Energy Profiling Master's Thesis in Computer Engineering Embedded Software Section Faculty Synchronization for Smartphone Energy Profiling Ioannis Oikonomidis #12;#12;Offline Trace Synchronization for Smartphone Energy Profiling MSc presentation 25th June 2013 Graduation Committee Prof.dr. Koen Langendoen

Langendoen, Koen

193

2011-12 Graduate Student Handbook Master of Northern Governance  

E-Print Network (OSTI)

to build on their professional experience. Students can take the MNGD program while continuing to work Master of Northern Governance and Develop- ment (MNGD) program was introduced as a pilot program at the University of Saskatchewan in 2010. The program received overwhelmingly positive feed- back and, as a result

Peak, Derek

194

Iyad M. Kamal Master of Arts in Economics, Aug 91  

E-Print Network (OSTI)

, Bowling Green, Ohio · Bachelor of Science in Business Administration, Aug 89 University of Jordan, AmmanIyad M. Kamal Education · Master of Arts in Economics, Aug 91 Bowling Green State University obtained his first degree from the University of Jordan in 1989 in Bachelor of Science of Business

195

BoneMaster™ HA Coating – An In Vivo Assessment  

Science Conference Proceedings (OSTI)

... group (668 N) demonstrated significantly higher pull out strength than control PPS group (348 N). After 32 weeks, the pull out strength for BoneMaster HA and PPS groups ... Facilitates Neural Stem Cell Adhesion, Proliferation and Differentiation ... Sol-Gel Synthesis of Bio-Active Nanoporous Sodium Zirconate Coated on ...

196

Analysis of soil vapor extraction expenses to estimate bioventing expenses. Master`s thesis  

Science Conference Proceedings (OSTI)

An in-depth analysis of the expenses incurred with five soil venting petroleum remediation projects was accomplished. The data was obtained from receipts provided by a major United States petroleum refiner and distributor. Cost categories were designed that incorporated all costs and provided a method to analyze the data. The five cost categories used were: permits, equipment, management, utilities, and analysis. Further analysis showed trends and described the behavior of the costs related to remediation events. The relative percentile for each cost category was found to be consistent among the projects. Many costs were also found to be very linear through out the life of the project from discovery to final cleanup. These linear costs for each cost category were also found to have similar slopes when comparing different projects.

Lokan, S.M.

1995-11-01T23:59:59.000Z

197

A Master Equation for Gravitational Decoherence: Probing the Textures of Spacetime  

E-Print Network (OSTI)

We give a first principles derivation of a master equation for the evolution of a quantum matter field in a linearly perturbed Minkowski spacetime, based solely on quantum field theory and general relativity. We make no additional assumptions nor introduce extra ingredients, as is often done in alternative quantum theories. When the quantum matter field is projected to a one-particle state, the master equation for a non-relativistic quantum particle in a weak gravitational field predicts decoherence in the energy basis, in contrast to most existing theories of gravitational decoherence. We point out the gauge nature of time and space reparameterizations in matter-gravity couplings, and warn that `intrinsic' decoherence or alternative quantum theories invoking stochastic dynamics arising from temporal or spatial fluctuations violate this fundamental symmetry of classical general relativity. Interestingly we find that the decoherence rate depends on extra parameters other than the Planck scale, an important feature of gravitational decoherence. This is similar to the dependence of the decoherence rate of a quantum Brownian particle to the temperature and spectral density of the environment it interacts with. The corresponding features when gravity acts as an environment in decohering quantum objects are what we call the `textures' of spacetime. We point out the marked difference between the case when gravity is represented as a background spacetime versus the case when gravity acts like a thermodynamic bath to quantum particles. This points to the possibility of using gravitational decoherence measurements to discern whether gravity is intrinsically elemental or emergent.

C. Anastopoulos; B. L. Hu

2013-05-22T23:59:59.000Z

198

Developing a master plan for hospital solid waste management: A case study  

SciTech Connect

Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management.

Karamouz, Mohammad [School of Civil Engineering, University of Tehran, Tehran (Iran, Islamic Republic of)], E-mail: karamouz@ut.ac.ir; Zahraie, Banafsheh [School of Civil Engineering, University of Tehran, Tehran (Iran, Islamic Republic of)], E-mail: bzahraie@ut.ac.ir; Kerachian, Reza [School of Civil Engineering, University of Tehran, Tehran (Iran, Islamic Republic of)], E-mail: kerachian@ut.ac.ir; Jaafarzadeh, Nemat [Faculty of Health Science, University of Ahvaz, Ahvaz (Iran, Islamic Republic of)], E-mail: n_jaafarzadeh@yahoo.com; Mahjouri, Najmeh [School of Environmental Engineering, University of Tehran, Tehran (Iran, Islamic Republic of)], E-mail: mahjouri@ut.ac.ir

2007-07-01T23:59:59.000Z

199

Empirical Master Equations. Part II: Application to Stratospheric QBO, Solar Cycle, and Northern Annular Mode  

Science Conference Proceedings (OSTI)

Time series of stratospheric climate variables are used to derive master equations in the discretized phase space spanned by three variables. The empirical master equation (EME) predicts the probability density function (PDF) in this phase space. ...

Mauro Dall’Amico; Joseph Egger

2007-09-01T23:59:59.000Z

200

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Project Definition Rating Index (PDRI) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Definition Rating Index (PDRI) Project Definition Rating Index (PDRI) Project Definition Rating Index (PDRI) The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for EM's projects. EM-PDRI Team members represent a number of EM sites, and have already used this project planning tool successfully. The EM-PDRI examines a wide range of project factors related to cost, scope, and schedule, and develops a numerical score as a measure of how well these factors are defined. It applies to all of EM's projects including Traditional/Construction; Environmental Remediation; and Facility Disposition (including Transition, Deactivation, and Decommissioning). If you have questions about the EM-PDRI, please

202

Environmental Management Completed Projects 2005-Present  

Energy.gov (U.S. Department of Energy (DOE))

This document provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project’s performance related to cost, schedule, and...

203

McMaster Security Services Annual Report 2009 1 Security Services  

E-Print Network (OSTI)

McMaster Security Services ­ Annual Report 2009 1 McMaster Security Services Annual Report 2009 #12;McMaster Security Services ­ Annual Report 2009 2 Mission Statement Developing a safe and secure to the Security Services Department. Methods and approaches to assist in achieving a safe and secure environment

Thompson, Michael

204

EM Newsletters  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

newsletters Office of Environmental Management 1000 newsletters Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 202-586-7709 en Moab Reaches 40-Percent Mark in Tailings Removal http://energy.gov/em/articles/moab-reaches-40-percent-mark-tailings-removal em/articles/moab-reaches-40-percent-mark-tailings-removal" class="title-link">Moab Reaches 40-Percent Mark in Tailings Removal

205

PROJECT MANGEMENT PLAN EXAMPLES Project Organization Examples  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Organization Examples Organization Examples Example 8 4.0 PROJECT ORGANIZATION Chapter 4.0 describes the principle project organizations, including their responsibilities and relationships. Other organizations, that have an interest in the project, also are described. 4.1 Principal Project Organizations and Responsibilities The management organization for the 324/327 Buildings Stabilization/Deactivation Project represents a partnership between four principal project organizations responsible for the project. The four project organizations and their associated summary responsibilities are described in the following paragraphs. 4.1.1 U.S. Department of Energy, Headquarters (HQ) The DOE-HQ Office of Nuclear Material and Facility Stabilization (EM-60) is primarily responsible for policy and budget decisions

206

Project Management Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance Office of Engineering and Construction Management (OECM) Monthly Project Dashboard Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management Project Definition Rating Index (PDRI) Project Management Institute (PMI) Construction Industry Institute (CII)

207

MASTER UCRL-9537 UNIVERSITY OF CALIFORNIA Lawrence Radiation Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

MASTER MASTER UCRL-9537 UNIVERSITY OF CALIFORNIA Lawrence Radiation Laboratory Berkeley, California Contract No.W-7405-eng-48 A NHARMONIC POTENTIAL CONSTANTS AND THEIR DEPENDENCE UPON BOND LENGTH Dudley R. Herschbach and Victor W. Laurie January 1961 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or

208

A Master Equation Approach to the `3 + 1' Dirac Equation  

E-Print Network (OSTI)

A derivation of the Dirac equation in `3+1' dimensions is presented based on a master equation approach originally developed for the `1+1' problem by McKeon and Ord. The method of derivation presented here suggests a mechanism by which the work of Knuth and Bahrenyi on causal sets may be extended to a derivation of the Dirac equation in the context of an inference problem.

Keith A. Earle

2011-02-06T23:59:59.000Z

209

Oil and Gas Field Code Master List 1997  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List 1997 is the seventeenth annual listing of all identified oil and gas fields in the United States. It is updated with field information collected through October 1997. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry.

Robert F. King

1998-02-01T23:59:59.000Z

210

Oil and Gas Field Code Master List 1998  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List 1998 is the eighteenth annual listing of all identified oil and gas fields in the United States. It is updated with field information collected through October 1998. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry.

Robert F. King

1999-01-01T23:59:59.000Z

211

Oil and Gas Field Code Master List 2000  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List 2000 is the nineteenth annual listing of all identified oil and gas fields in the United States. It is updated with field information collected through November 2000. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry.

Robert F. King

2001-01-01T23:59:59.000Z

212

Oil and Gas Field Code Master List 2003  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List 2001 is the twenty second annual listing of all identified oil and gas fields in the United States. It is updated with field information collected through November 2002. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry.

Robert F. King

2004-03-01T23:59:59.000Z

213

Oil and Gas Field Code Master List 2001  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List 2001 is the twentieth annual listing of all identified oil and gas fields in the United States. It is updated with field information collected through November 2001. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry.

Robert F. King

2002-01-01T23:59:59.000Z

214

Oil and Gas Field Code Master List 2002  

Reports and Publications (EIA)

The Oil and Gas Field Code Master List 2001 is the twenty first annual listing of all identified oil and gas fields in the United States. It is updated with field information collected through November 2002. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry.

Robert F. King

2003-01-01T23:59:59.000Z

215

Oil and Gas field code master list 1995  

Science Conference Proceedings (OSTI)

This is the fourteenth annual edition of the Energy Information Administration`s (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1995 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the US. The Field Code Index, a listing of all field names and the States in which they occur, ordered by field code, has been removed from this year`s publications to reduce printing and postage costs. Complete copies (including the Field Code Index) will be available on the EIA CD-ROM and the EIA World-Wide Web Site. Future editions of the complete Master List will be available on CD-ROM and other electronic media. There are 57,400 field records in this year`s Oil and Gas Field Code Master List. As it is maintained by EIA, the Master List includes the following: field records for each State and county in which a field resides; field records for each offshore area block in the Gulf of Mexico in which a field resides; field records for each alias field name (see definition of alias below); and fields crossing State boundaries that may be assigned different names by the respective State naming authorities. Taking into consideration the double-counting of fields under such circumstances, EIA identifies 46,312 distinct fields in the US as of October 1995. This count includes fields that no longer produce oil or gas, and 383 fields used in whole or in part for oil or gas Storage. 11 figs., 6 tabs.

NONE

1995-12-01T23:59:59.000Z

216

Project Execution Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

217

EM Contributes Expertise to Comprehensive Resource on Managing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects October 30, 2013 -...

218

Microsoft Word - FINAL EM Continuous Improvement - 2 Nov 10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

efficiency, minimize duplication, and improve data quality; ultimately enhancing management of EM capital asset projects and operations activities. Controlling Project and...

219

Projections toward the cultivation of a site by the Sinepuxent Bay  

E-Print Network (OSTI)

These design projections are for a site in West Ocean City, Maryland. The scenario is that an oceanographic research institution wishes to master plan the site to accommodate their activities and to expand the nearby harbor ...

Schoellkopf, Jeff (Jeffrey Herbert)

1984-01-01T23:59:59.000Z

220

Hawaiian Electric Company, Inc. Photovoltaic Energy Park Master Development Planning  

Science Conference Proceedings (OSTI)

This document describes a Master Development Plan to develop, construct, and operate a photovoltaic energy park (PVEP). The central feature of the park would be a large-scale solar power plant with up to 3.0 MW (peak) capacity of single axis tracking and fixed systems. The park would be developed in phases using multiple 100 kilowatt (peak) solar power systems. The plant would utilize proven PV technology commonly available at the time of the construction. In addition, space has been set aside for resear...

2004-02-20T23:59:59.000Z

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Integrated Project Team RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Project Team (IPT) Review Module Integrated Project Team (IPT) Review Module March 2010 CD-0 This R O 0 Review Modul OFFICE OF Inte C CD-1 le was piloted F ENVIRO Standard R grated P Rev Critical Decis CD-2 M at the OR U 23 incorporated ONMENTAL Review Plan Project Te view Module sion (CD) Ap CD March 2010 33 Disposition in the Review L MANAGE n (SRP) eam (IPT e pplicability D-3 Project in 200 Module. EMENT T) CD-4 09. Lessons lea Post Ope arned have been eration n Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

222

July 2013 Project Dashboard | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013-07-25-FINAL.pdf More Documents & Publications EM Current Project Performance LNG Export Study - Related Documents 2013 Transmission Reliability Program Peer Review -...

223

ADVANCED MIXED WASTE TREATMENT PROJECT (AMWTP)  

NLE Websites -- All DOE Office Websites (Extended Search)

ADVANCED MIXED WASTE TREATMENT PROJECT Idaho Treatment Group, LLC (ITG) Contract No. DE-EM0001467 You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations >...

224

President Obama Announces New Plan to Create STEM Master Teaching Corps |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces New Plan to Create STEM Master Teaching Announces New Plan to Create STEM Master Teaching Corps President Obama Announces New Plan to Create STEM Master Teaching Corps July 18, 2012 - 3:43pm Addthis *Editor's Note: This blog was originally posted on WhiteHouse.gov's Office of Sience and Technology Policy by Phil Larson. Today, the Obama Administration announced the President's plan to create a national Science, Math, Technology, and Engineering (STEM) Master Teacher Corps. The STEM Master Teacher Corps will begin in 50 locations across the country, each with 50 exceptional STEM educators. Over the next four years the Corps will expand to include 10,000 of the best STEM teachers in the nation. In joining the STEM Master Teachers Corps, these educators will make a commitment to champion the cause of STEM education in

225

Pushing Boundaries on Performance & Design: the ClimateMaster Trilogy 40  

NLE Websites -- All DOE Office Websites (Extended Search)

Pushing Boundaries on Performance & Design: the ClimateMaster Trilogy® 40 Pushing Boundaries on Performance & Design: the ClimateMaster Trilogy® 40 Q-Mode(tm) Geothermal Heat Pump August 01, 2013 The ClimateMaster Trilogy® 40 Q-Mode(tm) Geothermal Heat Pump, is the result of a 5 year collaboration between ClimateMaster, Inc. and Oak Ridge National Laboratory (ORNL). The unit reduces energy consumption by combining 3 variable speed technologies: an inverter-driven compressor, indoor air blower, and water pump. Introduced July 9, 2012, and available for limited order in December 2012, the ClimateMaster Trilogy® 40 Q-Mode(tm) Geothermal Heat Pump, the outcome of a 5 year collaboration between ClimateMaster, Inc., and Oak Ridge National Laboratory (ORNL), is an ultrahigh-efficiency geothermal heat pump that pro- vides space heating, cooling, and water heating.

226

Final report of Project 617, the Energy Saver  

SciTech Connect

The Project work was begun in January of 1995 and was completed in May of 1996. The authors performed a broad value engineering study to examine all parts and functions to lower costs, improve functioning and safety. The results of the Phase 1 work was a total redesign of the original Energy Saver resulting in two components instead of three, a weight of four pounds versus the original fourteen pounds and a reduction from 21 pieces to 10 pieces. The manufactured cost dropped from $350 to $175. Based on these improvements the Value Improvement Project has been successful. The second generation unit was named the BROIL-MASTER and has been registered under the Provisional Application (Patent) Program. The authors performed a technical analysis to determine the potential energy savings of applications identified and collect data on host product gas consumption, payback period, and other cost/saving relationships. The industrial search for energy project applications for the authors design was not successful. Seven Broil-Master demonstration projects have been successfully completed. The Broil-Master has received certification from the American Gas Association and UL approval is due by the end of July. The Restaurant Equipment Test Center of Pacific Gas and Electric is interested in testing the Broil-Master sometime in 1996. The Broil-Master was shown at an International Restaurant Equipment Show in September, 1995 and the National Restaurant Show in May, 1996. The authors now have under way four tests with chains and several other tests pending.

NONE

1996-12-31T23:59:59.000Z

227

Town of Hempstead: Project Energy, From Project Execution to Outreach & Education  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution To Outreach & Education Town of Hempstead? * Located in western Long Island,bordering Queens, NY * Established 1644 * Population: 760,000 ENERGY PARK Information Gathering * Motivated by Conservation Commissioner Ron Masters * LIPA Feasibility Study on Wind * Installed Anemometer - Wind Data * Informational Meetings: * Local Municipalities, Universities, Private Industry

228

Modeling the uptake and transpiration of TCE using phreatophytic trees. Master`s Thesis  

Science Conference Proceedings (OSTI)

Phytoremediation is a recent addition to the numerous methods used today to remediate ground water contaminants. It is proving more effective and efficient compared to existing remediation techniques. The use of phreatophytes, or water seeking trees, has great potential for phytoremediation. These trees are fast growing, long lived, grow their roots down to the ground water table, transpire large amounts of water, and are proven to actively remove contaminants from the soil horizon. The purpose of this research is to develop quantitative concepts for understanding the dynamics of TCE uptake and transpiration by phreatophytic trees over a short rotation woody crop time frame. This will he done by constructing a system dynamics model of this process and running it over a wide range of conditions. This research will offer managers a tool to simulate long-term uptake and transpiration of TCE at potential sites. The results of this study indicate that TCE is actively removed from the soil horizon by phreatophytic trees and a significant proportion of this TCE is then transpired. Changes in soil horizon parameters, xylem flow rates, and variables in the uptake equation greatly influence TCE uptake rates as well as transpiration. Also, parameters used in equations representing flows in and out of the leaf greatly influence transpiration. Better understanding of these processes is essential for managers to accurately predict the amount of TCE removed and transpired during potential phytoremediation projects.

Wise, D.P.

1997-12-01T23:59:59.000Z

229

EM-PDRI Team Concurrence  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(EM) PDRI Team concurs that Revision 1, January, 2001, reflects the requirements in DOE Order 413.3 and the Draft Manual for Program and Project Management, October, 2000. As...

230

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

231

A Master equation approach to modeling an artificial protein motor  

E-Print Network (OSTI)

Linear bio-molecular motors move unidirectionally along a track by coordinating several different processes, such as fuel (ATP) capture, hydrolysis, conformational changes, binding and unbinding from a track, and center-of-mass diffusion. A better understanding of the interdependencies between these processes, which take place over a wide range of different time scales, would help elucidate the general operational principles of molecular motors. Artificial molecular motors present a unique opportunity for such a study because motor structure and function are a priori known. Here we describe use of a Master equation approach, integrated with input from Langevin and molecular dynamics modeling, to stochastically model a molecular motor across many time scales. We apply this approach to a specific concept for an artificial protein motor, the Tumbleweed.

Kuwada, Nathan J; Linke, Heiner

2010-01-01T23:59:59.000Z

232

A Master equation approach to modeling an artificial protein motor  

E-Print Network (OSTI)

Linear bio-molecular motors move unidirectionally along a track by coordinating several different processes, such as fuel (ATP) capture, hydrolysis, conformational changes, binding and unbinding from a track, and center-of-mass diffusion. A better understanding of the interdependencies between these processes, which take place over a wide range of different time scales, would help elucidate the general operational principles of molecular motors. Artificial molecular motors present a unique opportunity for such a study because motor structure and function are a priori known. Here we describe use of a Master equation approach, integrated with input from Langevin and molecular dynamics modeling, to stochastically model a molecular motor across many time scales. We apply this approach to a specific concept for an artificial protein motor, the Tumbleweed.

Nathan J. Kuwada; Gerhard A. Blab; Heiner Linke

2010-04-07T23:59:59.000Z

233

Oil and gas field code master list, 1983. [Glossary included  

Science Conference Proceedings (OSTI)

This report is the second annual listing of all identified oil and gas fields in the United States with field information collected through November 1983. The purpose of the publication is to provide codes for easy identification of domestic fields. A standardization of these field codes will foster consistency in field identification by government and industry. The use of field names and codes listed in this publication is required on the survey forms and reports regarding field-specific data for the Energy Information Administration (EIA) and the Federal Energy Regulatory Commission. A glossary of the terms is provided to assist the readers in more fully understanding the information in this Field Code Master List. 8 figures, 4 tables.

Not Available

1984-01-01T23:59:59.000Z

234

Project title: A UK masters course in Advanced Chemical Engineering Practice  

E-Print Network (OSTI)

program design to share courses wherever possible, and bring together students from different disciplines. Joint delivery of management and technical material in order to focus innovation into more high-value areas of problem definition and needs... -related subjects. Benefits to companies Companies can benefit from this programme in two main ways. The first is by direct recruitment of the very highly trained and motivated chemical engineers who complete the programme. The second is by hosting...

2009-07-10T23:59:59.000Z

235

A Hierarchy of Approximations of the Master Equation Scaled by a Size Parameter  

Science Conference Proceedings (OSTI)

Solutions of the master equation are approximated using a hierarchy of models based on the solution of ordinary differential equations: the macroscopic equations, the linear noise approximation and the moment equations. The advantage with the approximations ... Keywords: Linear noise approximation, Master equation, Moment equations, Reaction rate equations

Lars Ferm; Per Lötstedt; Andreas Hellander

2008-02-01T23:59:59.000Z

236

Approved by Graduate Council 2/22/06 Master of Arts in Teaching Program Proposal  

E-Print Network (OSTI)

employees of Truman State University are under no obligation to work with the MAT program unlessSB #4605 Approved by Graduate Council 2/22/06 1 Master of Arts in Teaching Program Proposal Truman, MO 63501 (660)785-6074 wsm@truman.edu Introduction The Master of Arts in Teaching (MAT) Program

Gering, Jon C.

237

Combined SWIR and LWIR Mineral Mapping Using MASTER/ASTER | Open Energy  

Open Energy Info (EERE)

SWIR and LWIR Mineral Mapping Using MASTER/ASTER SWIR and LWIR Mineral Mapping Using MASTER/ASTER Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Combined SWIR and LWIR Mineral Mapping Using MASTER/ASTER Details Activities (1) Areas (1) Regions (0) Abstract: This research uses multispectral short-waveinfrared (SWIR) and long-wave-infrared (LWIR) remote sensing to map mineralogy associated with hot springs and epithermal mineral deposits. Selected sites around the world covering a range of active/inactive hot springs and deposit types are being studied using the ODIS/ASTER airborne simulator (MASTER) and the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER). MASTER and ASTER data analysis contribute to mineral mapping in the VNIR/SWIR, however, their main contribution is improved mapping of

238

EM Quaility Assurance Program (EM-QA-001 Revision 1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM-QA-001 EM-QA-001 Rev. 1 Issue Date 06/11/12 2 Project lifecycles including design, engineering, construction, commissioning, operation, and post-operation, e.g., surveillance and maintenance, deactivation, decommissioning, and environmental restoration. 3.0 APPLICABILITY The requirements contained within this document apply to EM HQ, EM Field/Project Offices, and EM contractors (including flow down to subcontractors, vendors, and suppliers) as applicable to the work being performed by each entity. Each organization will have an organizational-specific Quality Assurance Implementation Plan (QIP) describing how the applicable requirements of this QAP are implemented and/or passed down to lower- tier organizations. This requirement does not alter personnel (i.e., federal, contractor, or

239

EM SSAB Charter | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Communication & Engagement » EM SSAB » EM SSAB Services » Communication & Engagement » EM SSAB » EM SSAB Charter EM SSAB Charter The Environmental Management Site Specific Advisory Board's (SSAB)'s most recent charter outlines the objective, structure, and scope of the Board. EM SSAB Charter More Documents & Publications Environmental Management Advisory Board Charter Methane Hydrate Advisory Committee Charter Policies and Procedures Waste Management Nuclear Materials & Waste Tank Waste and Waste Processing Waste Disposition Packaging and Transportation Site & Facility Restoration Deactivation & Decommissioning (D&D) Facility Engineering Soil & Groundwater Sustainability Program Management Safety Security Quality Assurance Budget & Performance Acquisition Compliance Project Management

240

EM News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 1, 2012 EM Updates Congress on Nuclear Cleanup Progress in 18th Annual Caucus WASHINGTON, D.C. - EM and its cleanup contractors present briefings each year to the U.S. House Nuclear Cleanup Caucus on remediation operations at its major sites across the DOE complex. The briefings are organized by Rep. Doc Hastings (R-Wash.), who chairs the bipartisan caucus. March 1, 2012 EM Focuses on Contract, Project Management Improvements in Three-Day Workshop ORLANDO, Fla. - EM held a three-day workshop in Orlando this month focusing on strategies to improve contract and project management across the EM complex. March 1, 2012 The new resin was installed at the 100-DX Groundwater Treatment Facility, where it operated over one year without a single resin change. New Resin Improves Efficiency, Reduces Costs in Hanford Site Groundwater

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

2012 Quality Assurance Improvement Project Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE HQ/EFCOG Project Plan Rev. 0 DOE HQ/EFCOG Project Plan Rev. 0 2 Office of Environmental Management and Energy Facility Contractors Group 2012 Quality Assurance Improvement Project Plan Introduction: This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. The joint EM-EFCOG approach to enhancing QA signifies the inherent commitment to partnership and collaboration that is required between the contractor community and DOE to proactively improve performance of the EM mission and projects. This mandate is more

242

2010 Quality Assurance Improvement Project Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HQ/EFCOG Project Plan HQ/EFCOG Project Plan 2 Office of Environmental Management and Energy Facility Contractors Group 2010 Quality Assurance Improvement Project Plan Introduction: This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. The joint EM-EFCOG approach to enhancing QA signifies the inherent commitment to partnership and collaboration that is required between the contractor community and DOE to proactively improve performance of the EM mission and projects. This mandate is more

243

Project Submission Template  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

International Cooperation International Cooperation Project Title: Country/Organizations: Foreign: Foreign POC: U.S: U.S. POC: Technology Area: Scope of Collaborative Research and Development: Justification of Approach: Work Completed to Date: Overview of Proposed Scope for FY12: Summary Brief Description of Specific Project(s): Timeline: Estimated Cost: Status: CONTINUATION or NEW? Type of Contracting Instrument: (Int'l agreements, lab-lab agreement, etc) Participant Organizations General Scope Budget Foreign (Technical Scope) US (Overhead rate) (Technical Scope) TOTAL Budget Breakdown: Overhead rates and experimental work: APPROVE ____________________ DISAPPROVE ____________________ Approving Official: Associate PDAS, Alice Williams, EM-2.1

244

Row-Reduced Column Generation for Degenerate Master Problems  

E-Print Network (OSTI)

Feb 5, 2013 ... node of a search tree, and often produces strong dual bounds. ... In linear algebra terms, we work with a projection ... enter the current basis.

245

Oil and gas field code master list 1997  

Science Conference Proceedings (OSTI)

The Oil and Gas Field Code Master List 1997 is the sixteenth annual listing of all identified oil and gas fields in the US. It is updated with field information collected through October 1997. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry. As a result of their widespread adoption they have in effect become a national standard. The use of field names and codes listed in this publication is required on survey forms and other reports regarding field-specific data collected by EIA. There are 58,366 field records in this year`s FCML, 437 more than last year. The FCML includes: field records for each State and county in which a field resides; field records for each offshore area block in the Gulf of Mexico in which a field resides; field records for each alias field name (definition of alias is listed); fields crossing State boundaries that may be assigned different names by the respective State naming authorities. This report also contains an Invalid Field Record List of 4 records that have been removed from the FCML since last year`s report. These records were found to be either technically incorrect or to represent field names which were never recognized by State naming authorities.

NONE

1998-02-01T23:59:59.000Z

246

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Chart: project timeline - Project Milestones - Budget - Bibliography * Thank you 29 30 Organization Chart * Project team: Purdue University - Dr. Brenda B. Bowen: PI, student...

247

EM Launches Comprehensive Flickr Collection | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Launches Comprehensive Flickr Collection EM Launches Comprehensive Flickr Collection EM Launches Comprehensive Flickr Collection August 9, 2012 - 12:00pm Addthis A screenshot shows the EM Flickr Collection, which organizes more than 1,100 photos from around the EM complex. A screenshot shows the EM Flickr Collection, which organizes more than 1,100 photos from around the EM complex. WASHINGTON, D.C. - EM recently established an EM Flickr Collection, which organizes over 1,100 photos from around the EM complex. This collection is intended to be a resource for anyone in search of photographs of EM's nuclear cleanup activities, from enormous demolition projects to intricate groundwater cleanup. EM will continually update the compilation with new images. The Flickr photos are easy to view and download and use in their original,

248

Task pool teams implementation of the master equation approach for random sierpinski carpets  

Science Conference Proceedings (OSTI)

We consider the use of task pool teams in implementation of the master equation on random Sierpinski carpets. Though the basic idea of dynamic storage of the probability density reported earlier applies straightforward to random carpets, the randomized ...

K. H. Hoffmann; M. Hofmann; G. Rünger; S. Seeger

2006-08-01T23:59:59.000Z

249

Microsoft Word - Mitigation Action Plan master.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project DOE/EA-1591 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. This MAP is for the Proposed Action and includes all integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. No impacts reached the level to be considered significant even without these mitigation measures.

250

Remote telerobotic replacement for master-slave manipulator  

SciTech Connect

A remotely replaceable telerobotic manipulator (TRM) has been developed and deployed at the Defense Waste Processing Facility (DWPF) in support of its radioactive operation. The TRM replaces a Master-Slave Manipulator (MSM). The TRM is in use for both routine and recovery operations for the radioactive waste vitrification melter, the primary production device within the DWPF. The arm was designed for deployment and operation using an existing MSM penetration. This replacement of an existing MSM with a high power robotic device demonstrates the capability to perform similar replacement in other operating facilities. The MSM`s were originally deployed in the DWPF to perform routine light capacity tasks. During the testing phase of the DWPF, prior to its radioactive startup in 5/96, the need to remove glass deposits that can form at the melter discharge during filling of glass containment canisters was identified. The combination of high radiation and contamination in the DWPF melter cell during radioactive operation eliminated personnel entry as a recovery option. Therefore remote cleaning methods had to be devised. The MSM`s had neither the reach nor the strength required for this task. It became apparent that a robust manipulator arm would be required for recovery from these potential melter discharge pluggage events. The existing wall penetrations, used for the MSM`s, could not be altered for seismic and radiological reasons. The new manipulator was required to be of considerable reach, due to existing physical layout, and strength, due to the glass removal requirement. Additionally, the device would have to compatible with high radiation and remote crane installation. The physical size of the manipulator and the weight of components must be consistent with the existing facilities. It was recognized early-on that a manipulator of sufficient strength to recover from a pluggage event would require robotic functions to constrain undesirable motions.

Heckendorn, F.M.; Iverson, D.C. [Westinghouse Savannah River Company, Aiken, SC (United States); LaValle, D.R. [PaR Systems Inc., Shorview, MN (United States)

1997-05-01T23:59:59.000Z

251

Smarter finance for cleaner energy: open up master limited partnerships (MLPs) and real estate investment trusts (REITs) to renewable energy investment  

SciTech Connect

Master Limited Partnerships (MLPs) and Real Estate Investment Trusts (REITs)—both well-established investment structures—should be opened up to renewable energy investment. MLPs and, more recently, REITs have a proven track record for promoting oil, gas, and other traditional energy sources. When extended to renewable energy projects these tools will help promote growth, move renewables closer to subsidy independence, and vastly broaden the base of investors in America’s energy economy. The extension of MLPs and REITs to renewables enjoys significant support from the investment and clean energy communities. In addition, MLPs for renewables also enjoy bipartisan political backing in Congress.

Mormann, Feliz; Reicher, Dan

2012-11-15T23:59:59.000Z

252

http://www.fedcenter.gov/admin/pages/project.print.cfm?projectt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

» Assistance » FEDRPTS » EMS Compliance Reporting » Department of Energy » Legacy Management EMS Reporting » View/Edit/Create » Assistance » FEDRPTS » EMS Compliance Reporting » Department of Energy » Legacy Management EMS Reporting » View/Edit/Create Legacy Management EMS Data » View/Edit/Create Legacy Management EMS Data ‡ Click here or scroll down for Basic Viewing and Editing Instructions Project ID DOE-DOE/ESE/LM-Office of Legacy Management This project was last approved on 12/09/2011 at 6:47 PM by Tracy Ribeiro. This project was last updated on 12/09/2011 at 6:41 PM by Tracy Ribeiro. I. Facility/Organization- level EMS Information ? II. EMS External Audit & Declaration of Conformance III. EMS Performance Metrics for 2011 EMS Scorecard IV. EMS Relationship to Sustainable Practices V. EMS Experiences Agency/Department ? DOE Field History

253

UMore Park Wind Turbine Project Loggerhead Shrike Survey Draft Report to Barr Engineering  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UMore Park Wind Turbine Project UMore Park Wind Turbine Project Loggerhead Shrike Survey Draft Report to Barr Engineering Lee A. Pfannmuller June 15, 2010 [1] UMore Park Wind Turbine Project Loggerhead Shrike Survey Report to Barr Engineering Lee A. Pfannmuller June 15, 2010 Project Area The University of Minnesota owns approximately 5,000 acres in Dakota County, known as the University of Minnesota Outreach, Research and Education (UMore) Park. A concept master plan was developed

254

2011 Annual Planning Summary for Environmental Management (EM)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Environmental Management (EM).

255

Idaho's Advanced Mixed Waste Treatment Project Details 2013Accomplish...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Treatment Project Details 2013 Accomplishments December 24, 2013 - 12:00pm Addthis IDAHO FALLS, Idaho - EM and its contractor, Idaho Treatment Group (ITG), safely and...

256

EM News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 20, 2012 November 20, 2012 Department of Energy Announces Senior Management Changes WASHINGTON, D.C. - The Office of Environmental Management (EM) and the National Nuclear Security Administration (NNSA) today jointly announced two key personnel changes that will bring significant leadership and project management experience to both organizations. November 13, 2012 EMCBC Director Jack Craig, left to right, EM Executive Assistant Jillian Carter, who is EM's Feds Feed Families representative, and Senior Advisor for Environmental Management David Huizenga pause for a photo Nov. 8. Craig holds the "Teamwork Award" he and his staff received. EM Rockets Past Target for Donations to Stock Food Banks WASHINGTON, D.C. - EM donated close to 50,000 pounds of non-perishable

257

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Detailed End Points - Development of Detailed End Points - End Point Document Examples Example 28 7.0 ENDPOINTS Chapter 7.0 describes the endpoint development principles and methodology, administration, closure, and turnover package for the 324 and 327 Buildings Stabilization/Deactivation Project. 7.1 Background The endpoint method for the 324 and 327 Buildings Stabilization/Deactivation Project will follow the EM-60 guidance, published in DOE/EM-0318, Rev. 0, U.S. Department of Energy, Office of Environmental Management Facility Deactivation, Methods and Practice Handbook, Emphasizing End Points (sic) Implementation . The methods of defining endpoints for facility stabilization and deactivation were proven extremely effective at the PUREX and B-Plant facilities for planning work and interacting with the

258

Project of the Month  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

project-of-the-month Office of Environmental project-of-the-month Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 202-586-7709 en One-of-a-Kind Facility Now in Safe Shutdown http://energy.gov/em/articles/one-kind-facility-now-safe-shutdown em/articles/one-kind-facility-now-safe-shutdown" class="title-link">One-of-a-Kind Facility Now in Safe Shutdown

259

Klickitat Subbasin Anadromous Fishery Master Plan Prepared for  

E-Print Network (OSTI)

& Conservation Council Prepared by Yakama Nation in cooperation with Washington Department of Fish and Wildlife in cooperation with Washington Department of Fish and Wildlife December 2004 Principal preparers William Bosch, Melvin R. Sampson, Policy Advisor/Project Coordinator P.O. Box 151 Toppenish, Washington Cover Photo

260

Report: Acquisition, Project Management, and Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acquisition, Project Management, and Quality Assurance Acquisition, Project Management, and Quality Assurance September 30, 2009 Submitted by the EMAB Acquisition and Project Management Subcommittee Background For FY 2009 EMAB was tasked to review the management and delivery of EM's Construction Projects and confirm whether or not the program is headed in the right direction or needs to make some adjustments in order to improve efficiency. EMAB reviewed and discussed the topics of Acquisition and Project Management during its public meetings. The Acquisition and Project Management subcommittee, comprised of Mr. G. Brian Estes, Dr. Lawrence Papay, and Mr. David Swindle, engaged in teleconferences on August 7 and September 4 with EM senior personnel. Findings and Observations Deputy Assistant Secretary Jack Surash provided an update on EM acquisition initiatives, and he

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Project Accounts  

NLE Websites -- All DOE Office Websites (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

262

Coarse-Graining Can Beat the Rotating Wave Approximation in Quantum Markovian Master Equations  

E-Print Network (OSTI)

We present a first-principles derivation of the Markovian semi-group master equation without invoking the rotating wave approximation (RWA). Instead we use a time coarse-graining approach which leaves us with a free timescale parameter, which we can optimize. Comparing this approach to the standard RWA-based Markovian master equation, we find that significantly better agreement is possible using the coarse-graining approach, for a three-level model coupled to a bath of oscillators, whose exact dynamics we can solve for at zero temperature. The model has the important feature that the RWA has a non-trivial effect on the dynamics of the populations. We show that the two different master equations can exhibit strong qualitative differences for the population of the energy eigenstates even for such a simple model. The RWA-based master equation misses an important feature which the coarse-graining based scheme does not. By optimizing the coarse-graining timescale the latter scheme can be made to approach the exact solution much more closely than the RWA-based master equation.

Christian Majenz; Tameem Albash; Heinz-Peter Breuer; Daniel A. Lidar

2013-03-26T23:59:59.000Z

263

EM QA Working Group September 2011 Notes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 2011 Page 5 of 8 Lessons Learned on Flow-down of Quality Requirements at Idaho's Sodium Bearing Waste Project Including Comparison to the Previous EM QA Corporate Board...

264

Project 244  

NLE Websites -- All DOE Office Websites (Extended Search)

PROJECT PARTNER Advanced Technology Systems, Inc. Pittsburgh, PA PROJECT PARTNERS Ohio University Athens, OH Texas A&M University-Kingsville Kingsville, TX WEBSITES http:...

265

Projects | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

and Conferences Supporting Organizations Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Projects Projects 1-10 of 180 Results Prev...

266

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit...

267

Report: Small Business, Acquisition, and Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SMALL BUSINESS, ACQUISITION, AND PROJECT MANAGEMENT SMALL BUSINESS, ACQUISITION, AND PROJECT MANAGEMENT Background In FY 2007 EMAB was tasked to dialogue with the Office of Acquisition and Project Management (EM-50) on the topic of Small Business and provide advice and recommendations drawn from EMAB members' experience in commercial industry. Additionally, EMAB continued to review and discuss the topics of Acquisition and Project Management during its public meetings and in exchanges with EM senior personnel. Discussion In FY 2006, EM's small business prime contract goal of $208 million was exceeded by well over $100 million. The FY 2007 goal was $198 million, and once again, the program was poised to exceed that mark. Statistically, EM's execution of its small business acquisition strategy is commendable; however, EMAB has a number of

268

How California Determined Admissions Pools: Lower and Upper Division Student Targets and the California Master Plan for Higher Education  

E-Print Network (OSTI)

Higher Education UNIVERSITY OF CALIFORNIA, BERKELEY http://ishi.lib.berkeley.edu/cshe/ HOW CALIFORNIA DETERMINEDSTUDENT TARGETS AND THE CALIFORNIA MASTER PLAN FOR HIGHER

Douglass, John Aubrey

2001-01-01T23:59:59.000Z

269

Pushing Boundaries on Performance & Design: the ClimateMaster Trilogy® 40  

NLE Websites -- All DOE Office Websites (Extended Search)

Pump - Part II Pump - Part II September 01, 2013 The ORNL R&D 100 award winning team: Van Baxter, Ed Vineyard, Jeff Munk, Anthony Gehl, Moonis Ally, Keith Rice, and Bo Shen picture with the ClimateMaster Trilogy® 40 Q-Mode(tm) Geothermal Heat Pump. The ClimateMaster Trilogy® 40 Q-Mode(tm) Geothermal Heat Pump is the outcome of a 5 year collaboration between ClimateMaster, Inc., and Oak Ridge National Laboratory (ORNL). The Trilogy 40 Q-Mode is an ultra- high-efficiency geothermal heat pump that provides space heating, cooling, and water heating. Laboratory evaluation and modeling by ORNL predicted that the Trilogy 40 Q-Mode could save 55% to 61% of annual energy use and cost for space conditioning and water heating in residential applications versus new mini- mum efficiency (SEER 13) air-source heat pumps and

270

Using MotorMaster to Track Motor Inventory and Analyze Purchasing Decisions  

E-Print Network (OSTI)

MotorMaster 4.0 can be a useful software package for electric motor management decisions in industrial facilities. To be successful, the MotorMaster database must be populated with detailed motor nameplate information. Georgia Tech worked with a large, motor intensive chemical manufacturing plant to collect motor nameplate information on motors 60 hp or larger and populate the motor database. Approximately 130 motors were identified and surveyed. The completed motor database is used to track maintenance actions and to analyze motor replacement options. The approach used to secure and enter motor nameplate data along with examples of purchasing analyses completed will be presented. The success of the MotorMaster software with large motors has convinced the firm to expand its use to smaller horsepower motors.

Brown, M.; Meffort, W.

2007-01-01T23:59:59.000Z

271

Kraus representation for maps and master equation in spin star model with layered environment  

E-Print Network (OSTI)

Quantum operations are usually defined as completely positive (CP), trace preserving (TP) maps on quantum states, and can be represented by operator-sum or Kraus representations. In this paper, we calculate operator-sum representation and master equation of an exactly solvable dynamic of one-qubit open system in layered environment . On the other hand, we obtain exact Nakajima-Zwanzig (NZ) and time-convolutionless (TCL) master equation from the maps. Finally, we study a simple example to consider the relation between CP maps and initial quantum correlation and show that vanishing initial quantum correlation is not necessary for CP maps.

Mahmoud Mahdian; Hadi Mehrabpour

2013-04-22T23:59:59.000Z

272

EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's Strategic Planning Initiative Examines Impact of Lower Funding EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets February 1, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM is conducting a strategic planning effort that aims to optimize progress in the organization's environmental cleanup program. As part of efforts to continuously improve the effectiveness and efficiency of resource management and build on the success of the $6 billion EM American Recovery and Reinvestment Act Program, EM headquarters officials are working with staff at EM's 17 field sites to analyze the impact of austere funding projections on project costs and schedules. EM is working to align the cleanup program with current budget realities and prioritize

273

EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's Strategic Planning Initiative Examines Impact of Lower Funding EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets February 1, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM is conducting a strategic planning effort that aims to optimize progress in the organization's environmental cleanup program. As part of efforts to continuously improve the effectiveness and efficiency of resource management and build on the success of the $6 billion EM American Recovery and Reinvestment Act Program, EM headquarters officials are working with staff at EM's 17 field sites to analyze the impact of austere funding projections on project costs and schedules. EM is working to align the cleanup program with current budget realities and prioritize

274

EM News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 30, 2013 October 30, 2013 Oak Ridge's environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of Use OAK RIDGE, Tenn. - Oak Ridge is working to remediate contaminated areas in one of the EM program's most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War. October 30, 2013 Magazine Bestows Safety Award on EM Contractor RICHLAND, Wash. - A woman-owned small business prime contractor to EM's Office of River Protection has been named one of America's safest companies for 2013 by EHS Today magazine. October 30, 2013

275

EM News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 14, 2012 May 14, 2012 Senior Advisor for Environmental Management Dave Huizenga, right, and Portsmouth-Paducah Project Office Manager Bill Murphie listen as UK College of Design graduate student Nate Owings, foreground, explains a Paducah site model. The model was displayed at the EM Site- Specific Advisory Board Chairs Meeting in Paducah, where Huizenga spoke April 18. Students Imagine Paducah Site as Technical, Industrial Hub PADUCAH, Ky. - University of Kentucky (UK) College of Design students envision the Paducah site as a thriving, multiple-use area in the future. May 7, 2012 EM Announces New Director of Office of External Affairs WASHINGTON, D.C. - EM has announced that Paul Seidler has joined EM as the Director of the Office of External Affairs. May 3, 2012

276

Uniform Methods Project Related Links | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Related Links Related Links Uniform Methods Project Related Links The websites and publications listed below provide supporting information for the Uniform Methods Project and for evaluation, measurement, and verification (EM&V) of energy efficiency programs. Glossaries of EM&V Terms Federal EM&V Resources International Resources Related Standards Glossaries of EM&V Terms The following glossaries provide definitions of technical language and EM&V terms. Appendix A: Glossary of Terms, Energy Efficiency Program Impact Evaluation Guide Appendix A has a glossary of EM&V terms; published by the EM&V SEE Action Working Group. Federal EM&V Resources SEE Action Evaluation, Measurement, and Verification Working Group The State and Local Energy Efficiency Action Network (SEE Action)

277

On the non-linearity of the master equation describing spin-selective radical-ion-pair reactions  

E-Print Network (OSTI)

We elaborate on the physical meaning of the non-linear master equation that was recently derived to account for spin-selective radical-ion-pair reactions. Based on quite general arguments, we show that such a non-linear master equation is indeed to be expected.

Kominis, I K

2010-01-01T23:59:59.000Z

278

Role of initial system-environment correlations: A master equation approach  

E-Print Network (OSTI)

In order to achieve practical implementations of emerging quantum technologies, it is important to have a firm understanding of the dynamics of realistic quantum open systems. Master equations provide a widely used tool in this regard. In this work, we first construct a master equation valid for weak system-environment coupling. The master equation we construct explicitly takes into account the effect of initial system-environment correlations. We then investigate the role of initial system-environment correlations using this master equation for a system consisting of many two-level atoms interacting with a common environment. We show that, in general, due to the initial system-environment correlations, the quantum state of the system can evolve at a faster time-scale. Moreover, we also consider different initial state preparations, and demonstrate that the influence of the initial correlations depends on the initial state preparation. Our results can be of interest to many topics based on quantum open systems where system-environment correlation effects have been neglected before.

Adam Zaman Chaudhry; Jiangbin Gong

2013-07-02T23:59:59.000Z

279

Updated Nov. 3, 2009 Accelerated BS/Masters Program in Electrical & Computer Engineering  

E-Print Network (OSTI)

Program at Colorado State University The Department of Electrical and Computer Engineering (ECE) offersUpdated Nov. 3, 2009 Accelerated BS/Masters Program in Electrical & Computer Engineering **Please note this program is only available to graduates of the Electrical & Computer Engineering Undergraduate

280

Science Education Master Teacher UCI Cal Teach Science and Mathematics Program  

E-Print Network (OSTI)

Science Education Master Teacher UCI Cal Teach Science and Mathematics Program Program Description The UCI Cal Teach Science and Mathematics Program is a new undergraduate teacher preparation program for aspiring middle school and high school math and science teachers. Its curriculum is modeled after

Loudon, Catherine

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Science and Math Education Master Teachers UC Irvine California Teach Science and Mathematics Program  

E-Print Network (OSTI)

Science and Math Education Master Teachers UC Irvine California Teach Science and Mathematics Program Program Description The UCI Cal Teach Science and Mathematics Program is an undergraduate teacher preparation program for aspiring middle school and high school math and science teachers. Several hallmarks

Barrett, Jeffrey A.

282

Coherent Phase Control in Closed and Open Quantum Systems: A General Master Equation Approach  

E-Print Network (OSTI)

The underlying mechanisms for one photon phase control are revealed through a master equation approach. Specifically, two mechanisms are identified, one operating on the laser time scale and the other on the time scale of the system-bath interaction. The effect of the secular and non-secular Markovian approximations are carefully examined.

Pachon, Leonardo A; Brumer, Paul

2013-01-01T23:59:59.000Z

283

Improving scalability of Bag-of-Tasks applications running on master-slave platforms  

Science Conference Proceedings (OSTI)

Bag-of-Tasks applications are parallel applications composed of independent tasks. Examples of Bag-of-Tasks (BoT) applications include Monte Carlo simulations, massive searches (such as key breaking), image manipulation applications and data mining algorithms. ... Keywords: Bag-of-Tasks applications, Master-slave platforms, Scalability analysis

Fabr?cio A. B. da Silva; Hermes Senger

2009-02-01T23:59:59.000Z

284

Hawai'i Bioenergy Master Plan Green Jobs, Biofuels Development, and  

E-Print Network (OSTI)

Hawai'i Bioenergy Master Plan Green Jobs, Biofuels Development, and Hawaii's Labor Market associated with biofuels in Hawai'i. In particular, it discusses how a potential biofuels industry might policy makers and leaders consider how best to support biofuels. One major labor market question

285

A unified theory of zero power and power reactor noise via backward master equations  

E-Print Network (OSTI)

A unified theory of zero power and power reactor noise via backward master equations I. Pa´ zsit a, *, Z.F. Kuang a,b , A.K. Prinja c a Department of Reactor Physics, Chalmers University of Technology Department of Chemical and Nuclear Engineering, University of New Mexico, Albuquerque, NM 87131, USA Received

Pázsit, Imre

286

Mastering Windows: Improving Reconstruction Thomas Theul Helwig Hauser Eduard Groller \\Lambda  

E-Print Network (OSTI)

Mastering Windows: Improving Reconstruction Thomas Theu�l Helwig Hauser Eduard Gr¨oller \\Lambda­Rom spline and derivative and (c) Kaiser windowed sinc and cosc of width three with numerically optimal. This can be accomplished by multiplying them with windowing functions. In this paper we discuss and assess

287

Science Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

288

Microsoft PowerPoint - International Projects1.pptm.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

International Program International Program Modeling Activities Boris Faybishenko Lawrence Berkeley National Laboratory Berkeley, CA DOE-EM Project Managers- Kurt Gerdes and Skip Chamberlain Performance Assessment Community of Practice Technical Exchange April 13-14, 2010, Richland, WA Outline * Review of projects formerly supported by DOE-EM * Potential International Projects and Analogue Case Studies for ASCEM - Chernobyl Cooling Pond, Ukraine - Nonclassical transport modeling-project with the Nuclear Safety Institute of RAS, Russia - Uranium Mine and Mills Tailing's Covers * Central Asia--Kazakhstan, Tajikistan, Kyrgyzstan, and Uzbekistan - Cementitious Materials for Long-Term Storage and Disposal * Conclusions and Recommendations Overall Objectives of DOE-EM International Program Modeling Activities

289

Economics of chlorofluorocarbon (CFC) machine replacement. Master's thesis  

Science Conference Proceedings (OSTI)

Continued use of chlorofluorocarbon (CFC) refrigerants may have a severe financial as well as operational impact on the users of air-conditioning and other refrigeration equipment as price increases continue and production is phased out. With production of CFC's coming to a halt on 31 December 1995, the two major refrigerants that have been used in commercial and industrial cooling applications will no longer be available. The phase out of production is a result of national and international agreement that these, as well as other CFC's, are a primary cause of the depletion of the stratospheric ozone layer. To help the user reduce this impact, an economic model based on the time value of money and utilizing replacement analysis was developed. The model is designed to require the user to supply information on his own equipment and on the projected costs of non-CFC replacement equipment. After running the model, the point in time when the existing equipment should be replaced is indicated. By way of example, the model is applied to a centrifugal chiller application. The results of this approach indicate that the increase in CFC costs is only a small factor in the cost of chiller operation. Rather than make a replacement to avoid the high price of refrigerant, the controlling factor is the overall cost of power consumption required to provide the cooling effect.

Rudderow, G.D.

1994-09-01T23:59:59.000Z

290

EM News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 DUF6 Project Doubles Production in 2013 LEXINGTON, Ky. - The conversion plants at EM's Paducah and Portsmouth sites surpassed a fiscal year 2013 goal by converting 13,679 metric tons of depleted uranium hexafluoride (DUF6), more than doubling production a year earlier. November 26, 2013 BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident. Portsmouth Site Plant Surpasses Five Years Without Lost-Time Accident PIKETON, Ohio - The depleted uranium hexafluoride (DUF6) conversion plant at EM's Portsmouth site marked five years without a lost-time accident this month, equating to 1,826 workdays or 1,916,103 work hours. November 26, 2013 Volunteers from West Valley Demonstration Project gather before distributing items collected in an annual food drive.

291

Project Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Project Management Project Management A worker suppresses dust during the demolition of Building 21-5, which was part of the DP West site. The last of 14 buildings at the historic DP West site at Los Alamos National Laboratory’s Technical Area 21 (TA-21) was demolished, reducing the Lab’s footprint by more than 100,000 square feet. A worker suppresses dust during the demolition of Building 21-5, which was part of the DP West site. The last of 14 buildings at the historic DP West site at Los Alamos National Laboratory's Technical Area 21 (TA-21) was demolished, reducing the Lab's footprint by more than 100,000 square feet. EM CAPITAL PORTFOLIO EM is tasked with solving the large scale, technically challenging risks and hazardous conditions posed by the world's largest nuclear cleanup.

292

Love 'em and Leave 'em  

NLE Websites -- All DOE Office Websites (Extended Search)

Love 'em and Leave 'em Love 'em and Leave 'em Nature Bulletin No. 113 April 26, 1947 Forest Preserve District of Cook County William N. Erickson, President Roberts Mann, Supt. of Conservation LOVE'EM AND LEAVE 'EM. Two of the earliest and most interesting wildflowers are the bloodroot and the Dutchman's breeches. The few places where they can be found in Cook County are on wooded slopes with moist rich soil, usually in a ravine. Dutchman's breeches seems to prefer a slope facing north or east, and with it you will also find bloodroot. Both like partial shade, but bloodroot frequently grows where Dutchman's breeches do not. The bloodroot blooms first. The flower stalk first appears with a leaf tightly wrapped around it below the large bud, like a green pencil. On a warm sunny day the bud unfolds into a big white flower with eight or more petals and bright yellow stamens at the center. On a cold cloudy day it will fold up again. The leaves are big and broad, deeply lobed, with a network of veins. The plant gets its name from the thick fleshy horizontal root which, when cut, bleeds a bright-red acrid juice used by the Indians for war paint and by the pioneers for dyes and cough syrup.

293

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

294

Modeling study for the implementation of in situ cometabolic bioremediation of trichloroethylene-contaminated groundwater. Master`s Thesis  

Science Conference Proceedings (OSTI)

The limitations of conventional groundwater remediation technologies have led to the development of innovative technologies which may achieve national hazardous waste site remediation goals. Before an innovative technology can be implemented in the field, remedial project managers, regulators and other stakeholders require adequate modeling tools to help assess the applicability of the technology at a particular site. This modeling study investigates how an innovative technology, in situ cometabolic bioremediation, might be implemented to remediate a TCE-contaminated site, under different site conditions. A steady-state model is developed which couples an analytical expression to simulate the effect of flow between multiple pumping and injection wells, with an expression to calculate TCE removal as groundwater circulates through in situ bioreactors established around the injection wells. Varying site conditions and well configurations are investigated to determine their effect on the overall treatment efficiency of a system. A dual screen well design is found to be an effective method for contaminant capture and treatment given typical values of anisotropy. Investigation of a multiple row implementation concept proves it to be an effective configuration for site cleanup. The model is integrated into interactive software which serves as a technology screening tool.

Christ, J.A.

1997-12-01T23:59:59.000Z

295

FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project  

SciTech Connect

This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders (''surveillance monitoring''); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.

Hartman, Mary J; Dresel, P Evan; Lindberg, Jon W; Newcomer, Darrell R; Thornton, Edward C

2001-10-31T23:59:59.000Z

296

FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project  

SciTech Connect

This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders ("surveillance monitoring"); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.

Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

2001-10-31T23:59:59.000Z

297

EM Policies and Procedures  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Management (EM) Desktop References This page offers Environmental Management (EM) operating policies, procedures, standards, workaids, organizational charts, and...

298

PARS II - Integrated Project Team Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Project Team Meeting Integrated Project Team Meeting John Makepeace (OECM) Ken Henderson (EES), Norm Ayers (EES) November 19, 2009 2 2 Agenda * Brief Review Last Meeting * List of Action Items * Project Milestones * Communications Channels for Deployment * Requesting Contacts for EM Group 1 & 2 Projects * Information Package to Contractor * Letter of Introduction * CPP Upload Document * Project Data Template * New Action Items * List of EM Group 1 & 2 Projects 3 Action Items Item Action Item Status 1 EES will write the marketing cover letter for the Information Package. C 2 EES will deliver the Preliminary Information Package to OECM by Monday Nov 16, close of business, for review. C 3 A placeholder of COB Tuesday Nov 17 was established for EES to give OECM the Information Package. C 4 Distribution of the package will commence after review by OECM.

299

DOE Office of Environmental Management Project and Contract Management Improvement Timeline  

Energy.gov (U.S. Department of Energy (DOE))

Improving DOE contract and project management is a top priority of the Department’s senior management and entire organization.  View some highlights of EM’s improvement actions here.

300

Deputy Secretary Commends EM's Achievement Award Winners | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deputy Secretary Commends EM's Achievement Award Winners Deputy Secretary Commends EM's Achievement Award Winners Deputy Secretary Commends EM's Achievement Award Winners June 7, 2013 - 12:00pm Addthis Deputy Secretary Daniel Poneman, center, presents the Secretary's Achievement Award to Oak Ridge Project Manager David Queen and Oak Ridge EM Deputy Manager Sue Cange for their work in Oak Ridge's K-33 Gaseous Diffusion Process Building Project. Deputy Secretary Daniel Poneman, center, presents the Secretary's Achievement Award to Oak Ridge Project Manager David Queen and Oak Ridge EM Deputy Manager Sue Cange for their work in Oak Ridge's K-33 Gaseous Diffusion Process Building Project. Deputy Secretary Daniel Poneman, right, presents the Secretary's Achievement Award to Richard Craun, representing the Idaho Operations Office.

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Assessment of the Integrated Facility Disposition Project at Oak Ridge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of the Integrated Facility Disposition Project at Oak Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program Secretarial Offices (PSOs) of Nuclear Energy (NE), Science (SC), and the National Nuclear Security Administration (NNSA) to propose facilities and legacy waste for transfer to Environmental Management (EM) for final disposition or deactivation and decommissioning (D&D). Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM

302

Assessment of the Integrated Facility Disposition Project at Oak Ridge  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Integrated Facility Disposition Project at Oak the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program Secretarial Offices (PSOs) of Nuclear Energy (NE), Science (SC), and the National Nuclear Security Administration (NNSA) to propose facilities and legacy waste for transfer to Environmental Management (EM) for final disposition or deactivation and decommissioning (D&D). Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM

303

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

304

Oak Ridge's EM Program Seeks Public Input on Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge's EM Program Seeks Public Input on Cleanup Oak Ridge's EM Program Seeks Public Input on Cleanup Oak Ridge's EM Program Seeks Public Input on Cleanup April 25, 2013 - 12:00pm Addthis Oak Ridge’s EM leadership informed members of the public about projects and goals and answered questions during a public workshop this week. Oak Ridge's EM leadership informed members of the public about projects and goals and answered questions during a public workshop this week. Local residents and other stakeholders listen to Oak Ridge's EM senior leadership in a public workshop to learn about EM and provide input about future mission work. Local residents and other stakeholders listen to Oak Ridge's EM senior leadership in a public workshop to learn about EM and provide input about future mission work. Oak Ridge EM Manager Mark Whitney addresses participants on EM’s mission and priorities.

305

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

306

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

307

Project 364  

NLE Websites -- All DOE Office Websites (Extended Search)

765-494-5623 lucht@purdue.edu DEVELOPMENT OF NEW OPTICAL SENSORS FOR MEASUREMENT OF MERCURY CONCENTRATIONS, SPECIATION, AND CHEMISTRY Project Description The feasibility of...

308

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State...

309

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

310

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

311

Project 283  

NLE Websites -- All DOE Office Websites (Extended Search)

NJ 07039 973-535 2328 ArchieRobertson@fwc.com Sequestration ADVANCED CO 2 CYCLE POWER GENERATION Background This project will develop a conceptual power plant design...

312

Project 197  

NLE Websites -- All DOE Office Websites (Extended Search)

will bring economic value to both the industrial customers and to the participating companies. * Complete project by June 2006. Accomplishments A ceramic membrane and seal...

313

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh,...

314

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Interdisciplinary Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford...

315

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for...

316

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* Concrete products in this project * Standard 8" concrete blocks * Standard 4' x 8' fiber-cement boards CO 2 The Goals * Maximizing carbon uptake by carbonation (at least...

317

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Evaluating Potential Groundwater Impacts and Natural Geochemical...

318

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date...

319

Project 252  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Global Climate Energy Project Terralog Technologies TransAlta University of Alaska Fairbanks Washington State Department of Natural Resources Western Interstate...

320

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

research partnership to improve the understanding of CO 2 within coal and shale reservoirs. 2 2 3 Presentation Outline * Program Goal and Benefits Statement * Project...

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

mechanistic insights 5 Project Overview: Scope of work * Task 1 - Pipeline and Casing Steel Corrosion Studies * Evaluate corrosion behavior of pipeline steels in CO 2 mixtures...

322

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project Program Goals * Technical...

323

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* This project pinpoints the critical catalyst features necessary to promote carbon dioxide conversion to acrylate, validate the chemical catalysis approach, and develop an...

324

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources...

325

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number...

326

For more information, including detailed descriptions of the Masters courses and detailed program  

E-Print Network (OSTI)

requirements, please visit: energy.anu.edu.au/masters or contact: Professor Elmars Krausz, Research School of Chemistry krausz@rsc.anu.edu.au For all other ECI enquiries: W energy.anu.edu.au E energy.change@anu.edu.au M A S T E R O F E N E R G Y C H A N G E M O R E I N F O R M A T I O N The ANU Energy Change

327

Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory  

SciTech Connect

The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer- programmed maintenance system has been established at the Laboratory. (auth)

Jenness, R.G.; Wicker, C.D.

1975-01-01T23:59:59.000Z

328

The Texas Master Gardener program: an assessment of curriculum delivery and contribution to community development  

E-Print Network (OSTI)

Extension programs across the nation have been given the task of education and outreach to citizens of their respective states. Master Gardener programs have been seen as a way to provide horticultural education, while also providing outreach using the programÂ?s service requirement. Extension professionals have used a variety of training methods throughout the years. These methods include face-to-face workshop trainings, interactive television, and more recently World Wide Web methodologies. This study sought to test the effectiveness of CD-based training materials versus a traditional face-to-face training. Turfgrass management modules chosen for testing in this study included nutrient, water, and pest topics. ParticipantsÂ? knowledge levels were measured using a pre-test/post-test design. Student satisfaction with the learning materials and their perceptions of lawn care also were measured during the study. Results indicated that CD-based materials were more effective than were face-to- face workshops for teaching difficult turfgrass material to the Master Gardener trainees. Community development is one of the four focus areas for Texas Cooperative Extension. A secondary purpose was to determine if the Master Gardener program affected community development. Descriptive statistics were used to compare participantsÂ? past experiences with their anticipated experiences after completion of the Master Gardener program. Results indicated that community development activities were being completed, but the extent and type of development could not be measured. This study revealed several surprising and far-reaching implications for extension programming. These implications and recommendations for improvement of extension programs are discussed further. Recommendations for additional research also are included.

Mayfield, Chyrel Ann

2004-12-01T23:59:59.000Z

329

EM Contributes Expertise to Comprehensive Resource on Managing Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contributes Expertise to Comprehensive Resource on Managing Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects October 30, 2013 - 12:00pm Addthis EM officials wrote a chapter of this book, described as a valuable resource for project managers, plant managers, engineers, regulators, training professionals, consultants and academics. EM officials wrote a chapter of this book, described as a valuable resource for project managers, plant managers, engineers, regulators, training professionals, consultants and academics. WASHINGTON, D.C. - EM officials wrote a chapter of a recently published book, Managing Nuclear Projects - A Comprehensive Management Resource, which covers a range of areas with emphasis on process, requirements and

330

Report on Acquisition and Project Management Continuous Improvement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Acquisition and Project Management Continuous Improvement on Acquisition and Project Management Continuous Improvement Report on Acquisition and Project Management Continuous Improvement EM senior management has committed to extensive management reforms and has completed several robust improvements in contract and project management. Additional improvement initiatives are continuing and this document outlines the consolidated plan of these initiatives in a top-down framework of EM vision, goals, strategies, performance metrics, and specific improvement actions completed or being undertaken. Report on Acquisition and Project Management Continuous Improvement More Documents & Publications Microsoft Word - EERE PSRP 7 23 2010 Testimony Before the House Appropriations Subcommittee on Energy and Water Development

331

Report: EMAB Acquisition and Project Management Subcommittee Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SECOND INTERIM REPORT TO THE SECOND INTERIM REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee June 23, 2011 Background: On March 31, 2010, Dr. Inés Triay, Assistant Secretary for the U.S. Department of Energy's (DOE) Office of Environmental Management (EM), tasked the Environmental Management Advisory Board (EMAB or Board) to provide observations and recommendations regarding EM's updated strategy for reducing project and contract risks, and removing EM projects from the Government Accountability Office's (GAO) High Risk List. In response to this charge, members

332

(SSS)Project Dashboard 2013-11-26.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11/26/2013 11/26/2013 Office of Management Office of Acquisition and Project Management Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment Cost Performance Schedule Performance EERE University of California-LBNL 10-EE-05003 User Test Bed Facility (UTBF) 15,900,000 $ 15,900,000 $ G NA NA EM Bechtel National Inc. 01-D-416 Waste Treatment and Immobilization Plant (WTP) 5,781,000,000 $ 12,263,000,000 $ R 1.00 0.99 EM Parsons Government Services Inc. 05-D-405 Salt Waste Processing Facility (SWPF) 900,000,000 $ 1,339,000,000 $ R 1.04 1.03 EM URS / CH2M Hill Oak Ridge, LLC OR-0040.C1 K-25 D & D 479,400,000 $ 1,397,000,000 $ G 1.01 1.01 EM Safety & Ecology Corporation OR-0042.R1.4

333

(SSS)Project Dashboard 2013-12-20.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12/20/2013 12/20/2013 Office of Management Office of Acquisition and Project Management Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment Cost Performance Schedule Performance EERE University of California-LBNL 10-EE-05003 User Test Bed Facility (UTBF) 15,900,000 $ 15,900,000 $ G NA NA EM Bechtel National Inc. 01-D-416 Waste Treatment and Immobilization Plant (WTP) 5,781,000,000 $ 12,263,000,000 $ R 1.00 0.99 EM Parsons Government Services Inc. 05-D-405 Salt Waste Processing Facility (SWPF) 900,000,000 $ 1,339,000,000 $ R 1.04 1.04 EM URS / CH2M Hill Oak Ridge, LLC OR-0040.C1 K-25 D & D 479,400,000 $ 1,397,000,000 $ G 1.02 1.01 EM Safety & Ecology Corporation OR-0042.R1.4

334

New urbanism on a grand scale : the challenges for large-scale, multi-phase master planned developments  

E-Print Network (OSTI)

New Urbanism has been described as an urban design movement promoting the master planning and development of communities that have walkable, human-scale neighborhoods while integrating the necessary elements of modern life ...

Olchowicz, Edward J

2011-01-01T23:59:59.000Z

335

Solution of Master Equations for the anharmonic oscillator interacting with a heat bath and for parametric down conversion process  

E-Print Network (OSTI)

We solve analytically master equations that describe a cavity filled with a kerr medium, taking into account the dissipation induced by the environment, and parametric down conversion processes. We use superoperator techniques.

L. M. Arévalo-Aguilar; R. Juárez-Amaro; J. M. Vargas-Martínez; O. Aguilar-Loreto; H. Moya-Cessa

2008-06-25T23:59:59.000Z

336

Professional Master's Degree in Wetlands Conservation This program is designed for students who want professional training in the  

E-Print Network (OSTI)

want professional training in the multidisciplinary field of wetlands science and management Management POLSCI 786 Policy Evaluation POLSCI 784 Environmental Policy POLSCI 787 Policy Analysis & ChoiceProfessional Master's Degree in Wetlands Conservation This program is designed for students who

Schweik, Charles M.

337

Improve Motor System Efficiency with MotorMaster+, Software Tools for Industry, Industrial Technologies Program (ITP) (Fact Sheet)  

SciTech Connect

This fact sheet describes how the Industrial Technologies Program MotorMaster+ software tool aids industrial plants with finding energy-efficient motor replacement options and managing motor systems.

Not Available

2008-12-01T23:59:59.000Z

338

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

339

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

340

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

342

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

343

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

344

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

345

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

346

Microsoft Word - FINAL EM Continuous Improvement - 2 Nov 10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on on Acquisition and Project Management Continuous Improvement U.S. Department of Energy Office of Environmental Management October 2010 i Executive Summary Since the Office of Environmental Management (EM) was established within the U.S. Department of Energy (DOE) 20 years ago, both DOE and EM have been routinely scrutinized for their management of contracts and projects. Because most of EM's work is accomplished through the use of contracts, the acquisition management and project management functions have been regular targets for internal and external reviews, similar to other agencies with major cost reimbursement contracts. These reviews have produced several significant recommendations which, after implementation, have resulted in measurable performance

347

UNIVERSITY OF MINNESOTA This is to certify that I have examined this copy of a master's project by  

E-Print Network (OSTI)

-tight plywood box, connectors, and light emitting diodes). We are also grateful for the fiber polishing lessons Appendix B: Light Emitting Diodes...................................................37 Appendix C that each shone light from a blue light emitting diode (LED) through a wood column onto a portion

Minnesota, University of

348

Defining a competency framework to shape the professional education of national security master strategists: a web-based Delphi study  

E-Print Network (OSTI)

The purpose of this study was to develop a competency framework to shape development of a professional education program for master strategists in national security. The research problem focused on the absence of a competency framework to guide professional education of strategists who must be capable of conceptualization and innovation master strategists. The outcome of this study was a set of the most important components that constitute a professional education framework for master strategists. This Web-based study followed a RAND Delphi heuristic model that is qualitative in nature. Instrumentation for the first round consisted of a short vignette that placed panelists in a unique situation of being able to engage a "time traveler" from 20 years in the future. The time traveler represented a source of perfect knowledge, but could provide only a "yes" or "no" response to panel member questions concerning master strategist professional education needs in the year 2022. In the subsequent two Delphi rounds, the instruments consisted of panel member questions from the previous round. The panel of experts consisted of 12 professional strategists in the field of national security strategy. The results of the study provided support to the description of master strategists as strategic leaders, strategic theoreticians, and strategic practitioners. Panelists highlighted four content domains of personal attributes, security framework, theorybased knowledge, and culture and values that encompass the range of competencies for a master strategist professional education framework. Panel members detailed a need for master strategists to have a higher order temporal perspective to conceive time as epochs and ages, defined as shifts in development punctuated by events and prominent periods in progress, respectively. Panelists described a master strategist professional education framework that mirrored the theory of profound knowledge with meta-competencies as the basic building blocks.

Clark, Thomas George

2005-12-01T23:59:59.000Z

349

EM Newsletters | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Newsletters Newsletters EM Newsletters RSS December 24, 2013 The Akuna customized model setup user environment contains NASA World Wind and LaGrit/Gridder in its toolset user interface. The High Performance Computing environment allows the user to do Single Run, Sensitivity Analysis, Parameter Estimation and Uncertainty Qualification. ASCEM Project Achieves Major Milestone with Initial User Release WASHINGTON, D.C. - The Advanced Simulation Capability for Environmental Management (ASCEM) Project has reached a major milestone at record pace with the release of the research and development branch of the ASCEM toolset. December 24, 2013 Workers sample a well used to monitor groundwater at the Hanford site. EM's Richland Operations Office Celebrates Disposal Achievement in 2013

350

EM News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2012 23, 2012 An aerial view of the West Valley Demonstration Project. EM's Top Official Visits West Valley Site, Seneca Nation of Indians WEST VALLEY, N.Y. - Senior Advisor for Environmental Management David Huizenga commended employees at the West Valley Demonstration Project (WVDP) for safely and successfully managing the decommissioning of the only commercial spent nuclear fuel reprocessing facility that had operated in the United States during his recent visit to the site. August 20, 2012 Cement trucks transport a specially formulated grout that is pumped into two underground waste tanks at the Savannah River Site as part of work to close the massive structures. Revitalized Board Lays Out New Path amid EM's Recent Underground Tank Waste Successes IDAHO FALLS, Idaho - A board charged with advancing the cleanup of

351

Project Opportunities Tracker | Open Energy Information  

Open Energy Info (EERE)

Project Opportunities Tracker Project Opportunities Tracker Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Project Opportunities Tracker Agency/Company /Organization: U.S. DOE Energy Efficiency and Renewable Energy Sector: Energy Focus Area: Industry Phase: Evaluate Options Topics: Implementation Resource Type: Dataset User Interface: Website Website: ecenter.ee.doe.gov/EM/tools/Pages/PortfolioToolHome.aspx Country: United States Web Application Link: ecenter.ee.doe.gov/EM/tools/Pages/PortfolioToolHome.aspx Cost: Free OpenEI Keyword(s): Industrial Northern America Language: English The Project Opportunities Tracker provides a central location for viewing, comparing and prioritizing energy-saving projects. It allows users to sort, edit, and save their recommendations from assessments and tools in one

352

Project Fact Sheet Project Brief  

E-Print Network (OSTI)

engineering) At systems configuration time, either the CIMXML description of a particular substation can integration where the substation field data recorded by monitoring and protection Intelligent Electronic opportunities for the control applications. The data interfacing between the substation IEDs and EMS SCADA

353

2011 Project Management Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Workshop Project Management Workshop 2011 Project Management Workshop 2011 DOE Project Management Workshop Paul Bosco, The New DOE O 413.3B Jeff Baker, EERE's Research Support Facility Patrick Ferraro, Contract Management/ Project Management Summit Outbrief Anirban Basu, Construction Economic Forecast John Curran, LED Lighting Michael Deane, Construction and Demolition Debris Recycle Mark Fallon, Leadership & Safety Cost Estimating Panel, The Science and Art of Cost Estimating Tom Fox, Leading in Tough Times Bob Raines, Project Management Update Tony Cannon, Nuclear Quality Assurance Issues Peer Review Panel, Peer Reviews 101 Terry Cooke-Davies, Project Complexity Rod Rimando, EM Project Management Framework PMCDP Panel, PMCDP CRB CRB Panel Questions & Answers Chad Henderson, FPD's Perspective

354

EM American Recovery and Reinvestment Act Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Program Recovery Act Program www.em.doe.gov 1 Thomas Johnson, Jr. Recovery Act Program Director PRESENTED TO: Environmental Management Advisory Board (EMAB) December 5, 2011 EM's Mission "Complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons www.em.doe.gov 2 nuclear weapons development, production, and Government- sponsored nuclear energy research." EM's Recovery Act Program $6 Billion at 17 sites (12 states) Accelerated existing scope › Soil and groundwater remediation › Radioactive solid waste disposition › Facility decontamination & decommissioning www.em.doe.gov 3 Selected projects were "shovel-ready" › Fully-defined cost, scope, and schedule › Established regulatory framework › Proven technology

355

EM News Flashes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 14, 2013 March 14, 2013 Moab Site employees EM Leaders Visit Employees at Moab Site EM Principal Deputy Assistant Secretary Tracy Mustin and EM Consolidated Business Center Director Jack Craig visited the Moab Project sites in Utah on March 12. March 12, 2013 Workers use this mobile survey vehicle in American Recovery and Reinvestment Act work at the Hanford site to survey remediated areas for radiological contamination. EM Rolls Ahead of DOE Goals to Trim Vehicle Fleet Inventory WASHINGTON, D.C. - EM exceeded a DOE goal to reduce its vehicle fleet inventory, advancing the Department's broader initiative to cut greenhouse gas emissions and decrease petroleum consumption across the complex. March 11, 2013 An aerial view of Hanford's D Area shows the D Reactor (lower left) and DR Reactor. Workers are digging 85 feet to groundwater at two sites there to remove chromium contamination.

356

EM News Flashes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

News Flashes News Flashes EM News Flashes RSS December 23, 2013 Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines CARLSBAD, N.M. - Children in the Carlsbad area are warmer this holiday season thanks to the generosity of EM's Waste Isolation Pilot Plant (WIPP) team of employees. December 11, 2013 Jim Kopotic and his daughter Lauren pause for a photo after a race that raised money for cancer research and treatment. 'Can Do' Attitude Brings EM Family Together OAK RIDGE, Tenn. - It's 7:51 a.m. on a Tuesday morning. A white,

357

Western LNG project - Project summary  

Science Conference Proceedings (OSTI)

The Western LNG Project is a major new undertaking involving the liquefaction of conventional natural gas from the Western Canadian Sedimentary Basin at a plant on the British Columbia north coast. The gas in its liquid form will be shipped to Japan for consumption by utility companies. The Project represents a new era in gas processing and marketing for the Canadian natural gas industry.

Forgues, E.L.

1984-02-01T23:59:59.000Z

358

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

359

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

360

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

362

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

363

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

364

Jake Masters  

NLE Websites -- All DOE Office Websites (Extended Search)

aggregated, and went on to develop software to monitor, collect and report the electrical energy usage data. Jake then migrated this approach to the residential and small business...

366

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

367

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

368

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

369

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of CO 2 Exposed Wells to Predict Long Term Leakage through the Development of an Integrated Neural- Genetic Algorithm Project DE FE0009284 Boyun Guo, Ph.D. University of...

370

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

371

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

372

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

373

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

374

LUCF Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

RZWR'HVLJQDQG RZWR'HVLJQDQG +RZWR'HVLJQDQG ,PSOHPHQW&DUERQ ,PSOHPHQW&DUERQ 0HDVXULQJDQG0RQLWRULQJ 0HDVXULQJDQG0RQLWRULQJ $.WLYLWLHVIRU/8&) $.WLYLWLHVIRU/8&) 3URMH.WV 3URMH.WV Sandra Brown Winrock International sbrown@winrock.org Winrock International 2 3URMH.WGHVLJQLVVXHV 3URMH.WGHVLJQLVVXHV z Baselines and additionality z Leakage z Permanence z Measuring and monitoring z Issues vary with projects in developed versus developing countries Winrock International 3 /HDNDJH /HDNDJH z Leakage is the unanticipated loss or gain in carbon benefits outside of the project's boundary as a result of the project activities-divide into two types: - Primary leakage or activity shifting outside project area - Secondary leakage or market effects due to

375

Project 265  

NLE Websites -- All DOE Office Websites (Extended Search)

The goal of this project is to develop an on-line instrument using multi- wavelength lasers that is capable of characterizing particulate matter (PM) generated in fossil energy...

376

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

"Carbonsheds" as a Framework for Optimizing US CCS Pipeline Transport on a Regional to National Scale DOE-ARRA Project Number DE-FE0001943 Lincoln Pratson Nicholas School of the...

377

Project 114  

NLE Websites -- All DOE Office Websites (Extended Search)

Prototech Company SRI International Kellogg, Brown, and Root ChevronTexaco Sd-Chemie, Inc. COST Total Project Value 20,320,372 DOENon-DOE Share 15,326,608 4,993,764...

378

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

379

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Laboratory U.S. Department of Energy Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

380

Project 134  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Goal To demonstrate a "whole plant" approach using by-products from a coal-fired power plant to sequester carbon in an easily quantifiable and verifiable form. Objectives...

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

MANHATTAN PROJECT  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy traces its origins to World War II and  the Manhattan Project effort to build the first atomic bomb. As the direct descendent of the Manhattan Engineer District, the...

382

Project 310  

NLE Websites -- All DOE Office Websites (Extended Search)

carbohydrate generated from agricultural enterprises in the U.S., such as corn wet-milling. This project is studying the production of a suite of specialty chemicals by...

383

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

G., 2011, Design and package of a 14CO2 field analyzer: the Global Monitor Platform (GMP). Proceedings of SPIE, v 8156, p. 81560E 17 DOE-NETL PROJECT REVIEW MEETING 08-21-2012...

384

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

385

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

386

Project 297  

NLE Websites -- All DOE Office Websites (Extended Search)

of this project is to utilize pure oxygen at a feed rate of less than 10% of the stoichiometric requirement in demonstrating the use of oxygen-enhanced combustion in meeting...

387

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D...

388

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D....

389

Microsoft Word - EM Major Contracts Summary 093013update.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Cost plus incentive fee Idaho Treatment Group DE-EM0001467 101111-93015 456.4M Advanced Mixed Waste Treatment Plant Transuranic waste shipments to the Waste...

390

Microsoft PowerPoint - 6-03 DOE EM TEM Atlanta AREVA CCIM final 111010.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

November 17, 2010 November 17, 2010 Next-Generation Induction Melter Technology Development DOE EM Waste Processing Technical Exchange, Nov 16-18, 2010, Atlanta, GA Eric Tchemitcheff, AFS Print Close > DOE EM Waste Processing Technical Exchange - Nov 16-18, 2010 - Atlanta, GA 3 Presentation Outline Introduction CCIM Key Attributes CCIM Target Performance for Hanford WTP Applications EM Tank Waste R&D Plan Initiative 5.2.1  Scope and Objectives - CCIM Project CCIM Project - Proposed HLW Tasks and Milestones CCIM Project - Proposed LAW Tasks and Milestones CCIM Project - Summary FY10 Accomplishments CCIM Project - Anticipated Near-term Outcomes CCIM Project - Summary - Focus Areas Print Close > DOE EM Waste Processing Technical Exchange - Nov 16-18, 2010 - Atlanta, GA 4 DOE EM radwaste vitrification processing challenges are

391

Manhattan Project Truck Unearthed in Recovery Act Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

www.em.doe.govemrecovery April 20, 2011 Remnants of 1940s military truck buried in a Manhattan Project-era landfill LOS ALAMOS, N.M. - A Los Alamos National Laboratory (LANL)...

392

Reactor physics teaching and research in the Swiss nuclear engineering master  

Science Conference Proceedings (OSTI)

Since 2008, a Master of Science program in Nuclear Engineering (NE) has been running in Switzerland, thanks to the combined efforts of the country's key players in nuclear teaching and research, viz. the Swiss Federal Inst.s of Technology at Lausanne (EPFL) and at Zurich (ETHZ), the Paul Scherrer Inst. (PSI) at Villigen and the Swiss Nuclear Utilities (Swissnuclear). The present paper, while outlining the academic program as a whole, lays emphasis on the reactor physics teaching and research training accorded to the students in the framework of the developed curriculum. (authors)

Chawla, R. [Swiss Federal Inst. of Technology EPFL, CH-1015 Lausanne (Switzerland); Paul Scherrer Inst., CH-5232 Villigen PSI (Switzerland)

2012-07-01T23:59:59.000Z

393

DOE/EM Criticality Safety Needs Assessment  

SciTech Connect

The issue of nuclear criticality safety (NCS) in Department of Energy Environmental Management (DOE/EM) fissionable material operations presents challenges because of the large quantities of material present in the facilities and equipment that are committed to storage and/or material conditioning and dispositioning processes. Given the uncertainty associated with the material and conditions for many DOE/EM fissionable material operations, ensuring safety while maintaining operational efficiency requires the application of the most-effective criticality safety practices. In turn, more-efficient implementation of these practices can be achieved if the best NCS technologies are utilized. In 2002, DOE/EM-1 commissioned a survey of criticality safety technical needs at the major EM sites. These needs were documented in the report Analysis of Nuclear Criticality Safety Technology Supporting the Environmental Management Program, issued May 2002. Subsequent to this study, EM safety management personnel made a commitment to applying the best and latest criticality safety technology, as described by the DOE Nuclear Criticality Safety Program (NCSP). Over the past 7 years, this commitment has enabled the transfer of several new technologies to EM operations. In 2008, it was decided to broaden the basis of the EM NCS needs assessment to include not only current needs for technologies but also NCS operational areas with potential for improvements in controls, analysis, and regulations. A series of NCS workshops has been conducted over the past years, and needs have been identified and addressed by EM staff and contractor personnel. These workshops were organized and conducted by the EM Criticality Safety Program Manager with administrative and technical support by staff at Oak Ridge National Laboratory (ORNL). This report records the progress made in identifying the needs, determining the approaches for addressing these needs, and assimilating new NCS technologies into EM fissionable material operations. In addition, the report includes projections of future EM needs and associted recommendations.

Westfall, Robert Michael [ORNL; Hopper, Calvin Mitchell [ORNL

2011-02-01T23:59:59.000Z

394

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

395

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

396

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

397

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

398

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

399

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

400

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

402

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

403

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

404

Project Homepage  

NLE Websites -- All DOE Office Websites (Extended Search)

Middle School Home Energy Audit Middle School Home Energy Audit Project Homepage NTEP Home - Project Homepage - Teacher Homepage - Student Pages Abstract: This set of lessons provides an opportunity for midlevel students to gain a basic understanding of how energy is turned into power, how power is measured using a meter, the costs of those units and the eventual reduction of energy consumption and cost to the consumer. Introduction to Research: By conducting energy audits of their own homes and completing exercises to gain baclground information, students begin to see the importance of energy in their daily lives. By using the Internet as a research tool, students gain develop research skills as they gain knowledge for their project. They use e-mail to collaborate with energy experts and share results with other

405

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

406

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

407

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

408

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

409

Research projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Yuan » Research projects Yuan » Research projects Research projects Research Interests Scientific computing, domain decomposition methods Linear solvers for sparse matrices Computational plasma physics Grid generation techniques GPU computing Current Research PDSLin: A hybrid linear solver for large-scale highly-indefinite linear systems The Parallel Domain decomposition Schur complement based Linear solver (PDSLin), which implements a hybrid (direct and iterative) linear solver based on a non-overlapping domain decomposition technique called chur complement method, and it has two levels of parallelism: a) to solve independent subdomains in parallel and b) to apply multiple processors per subdomain. In such a framework, load imbalance and excessive communication lead to the performance bottlenecks, and several techniques are developed

410

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

411

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

412

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

413

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

414

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

415

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

416

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

417

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

418

Hallmark Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity, supervisory control and data acquisition (SCADA) systems require a method to validate device-to- device communication and verify that information has come from a trusted source and not been altered in transit. The Secure SCADA Communications Protocol (SSCP) provides message

419

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

420

Construction Project Safety and Health Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Project Safety and Construction Project Safety and Health Plan Review Module March 2010 CD-0 Co 0 Le OFFICE O onstructi CD-1 This Review ssons learned f OF ENVIRO Standard ion Proje Rev Critical D CD-2 M w Module has b from the pilot h ONMENTA Review Pla ect Safety view Modul Decision (CD CD March 2010 been piloted at have been inco AL MANAG an (SRP) y and He le D) Applicabili D-3 the INL IWTU orporated in Re GEMENT alth Plan ity CD-4 U Project. eview Module. n Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Use of precracked Charpy and smaller specimens to establish the master curve  

SciTech Connect

The current provisions used in the U.S. Code of Federal Regulations for the determination of the fracture toughness of reactor pressure vessel steels employs an assumption that there is a direct correlation between K{sub Ic} lower-bound toughness and the Charpy V-notch transition curve. Such correlations are subject to scatter from both approaches which weakens the reliability of fracture mechanics-based analyses. In this study, precracked Charpy and smaller size specimens are used in three-point static bend testing to develop fracture mechanics based K{sub k} values. The testing is performed under carefully controlled conditions such that the values can be used to predict the fracture toughness performance of large specimens. The concept of a universal transition curve (master curve) is applied. Data scatter that is characteristic of commercial grade steels and their weldments is handled by Weibull statistical modeling. The master curve is developed to describe the median K{sub Jc} fracture toughness for 1T size compact specimens. Size effects are modeled using weakest-link theory and are studied for different specimen geometries. It is shown that precracked Charpy specimens when tested within their confined validity limits follow the weakest-link size-adjustment trend and predict the fracture toughness of larger specimens. Specimens of smaller than Charpy sizes (5 mm thick) exhibit some disparities in results relative to weakest-link size adjustment prediction suggesting that application of such adjustment to very small specimens may have some limitations.

Sokolov, M.A.; McCabe, D.E.; Nanstad, R.K. [Oak Ridge National Lab., TN (United States); Davidov, Y.A. [Institue of Metal Science, Sofia (Bulgaria)

1997-12-01T23:59:59.000Z

422

A Poised Chromatin Platform for TGF-[beta] Access to Master Regulators  

SciTech Connect

Specific chromatin marks keep master regulators of differentiation silent yet poised for activation by extracellular signals. We report that nodal TGF-{beta} signals use the poised histone mark H3K9me3 to trigger differentiation of mammalian embryonic stem cells. Nodal receptors induce the formation of companion Smad4-Smad2/3 and TRIM33-Smad2/3 complexes. The PHD-Bromo cassette of TRIM33 facilitates binding of TRIM33-Smad2/3 to H3K9me3 and H3K18ac on the promoters of mesendoderm regulators Gsc and Mixl1. The crystal structure of this cassette, bound to histone H3 peptides, illustrates that PHD recognizes K9me3, and Bromo binds an adjacent K18ac. The interaction between TRIM33-Smad2/3 and H3K9me3 displaces the chromatin-compacting factor HP1, making nodal response elements accessible to Smad4-Smad2/3 for Pol II recruitment. In turn, Smad4 increases K18 acetylation to augment TRIM33-Smad2/3 binding. Thus, nodal effectors use the H3K9me3 mark as a platform to switch master regulators of stem cell differentiation from the poised to the active state.

Xi, Qiaoran; Wang, Zhanxin; Zaromytidou, Alexia-Ileana; Zhang, Xiang H.-F.; Chow-Tsang, Lai-Fong; Liu, Jing X.; Kim, Hyesoo; Barlas, Afsar; Manova-Todorova, Katia; Kaartinen, Vesa; Studer, Lorenz; Mark, Willie; Patel, Dinshaw J.; Massagué, Joan (Michigan); (MSKCC)

2012-02-07T23:59:59.000Z

423

Master equation for the probability distribution functions of overlaps between particles in two dimensional granular packings  

E-Print Network (OSTI)

How does the force chain network in a random granular material react to hydrostatic compression? We show that not only contacts, but also their opening and closing as well as interparticle gaps, i.e. virtual contacts, must be included for a comprehensive description of the system response involving the probability distribution functions (PDFs) of the extended force network. Considering overlaps/forces as stochastic variables, their conditional probability distributions (CPDs) are (numerically) determined and allow to formulate a Master equation for the PDFs. The insight one gets from the CPDs is striking: The mean change of contacts reflects non-affinity, while their fluctuations obey uncorrelated Gaussian statistics. In contrast, virtual contacts are mostly affine to isotropic (de)compression in average, but show multi-scale correlations with considerable probability of large "jumps" according to a stable distribution (cf. Levy distribution), that allows for a generalized central limit theorem. Noting that all changes of the network during compression are similarly scaled by the distance from the jamming density, the evolution of the system is fully described by the Master equation.

Kuniyasu Saitoh; Vanessa Magnanimo; Stefan Luding

2013-11-21T23:59:59.000Z

424

Curriculum development of a wildlife habitat gardening Golden Ray Series [sm] for the Junior Master Gardener [sm] Program  

E-Print Network (OSTI)

Development of the Backyard Buddies Golden Ray Series curriculum for the Junior Master Gardener Program is a labor-intensive and ongoing project requiring consideration of numerous factors relating not only to the habitat gardening subject matter of the curriculum but to educational, economic, political, and other concerns as well. This paper summarizes the steps in the development of this curriculum. A first necessary step in developing the Backyard Buddies curriculum was understanding the Junior Master Gardener Program for which it was intended. JMG began as a 4-H gardening program in Texas and has since spread to 25 states and 2 countries. The program stresses "hands-on" learning in an effort to make the program fun for participants. JMG curricula are also oriented toward "whole-child" education, where both emotional and intellectual fulfillment are goals. JMG groups can consist of anyone, needing only an adult leader and a minimum of 5 youth participants. The only other requirement for a JMG group is that they register their group through the Texas Agricultural Extension Service and that they buy the necessary curriculum materials. However while anyone can form a JMG group and while the curriculum is applicable to groups of any kind, the curriculum is geared toward the needs of schools in an effort to gain a wider participation in the program. For this reason, JMG curriculum is typically designed to fulfil the Texas Essential Knowledge and Skills (TEKS) requirements for schools. Likewise, JMG curricula are also often designed to be compatible with the materials typically found on standardized tests like the TAAS test. A Golden Ray Series, such as Backyard Buddies, is an outgrowth of JMG'S basic curriculum. Each Golden Ray Series focuses upon a specific concern related to gardening. A previous GRS, for instance, dealt with Health and Nutrition in the Garden while Backyard Buddies focuses specifically upon habitat gardening. In developing the Backyard Buddies curriculum, JMG guidelines had to be followed while also developing a curriculum that would teach youth how to create and maintain a habitat garden. Because the final goal of this curriculum was to give learners an understanding of how to attract wildlife to a garden and to instill an appreciation of wildlife in learners, a Backwards Design approach to curriculum development was used. Finally, basic research had to be conducted in order to insure that all activities were factually-accurate as well as age-appropriate. Beginning with lessons on what habitats are, Backyard Buddies first section guarantees that learners have the necessary vocabulary and the necessary scientific understanding of wildlife needs to begin a habitat garden. This basic education continues with the next section on elements, such as food, water, and shelter, that are essential to the survival of wildlife in a garden setting. Following these sections come sections on birds, mammals, insects, and reptiles/amphibians. These sections deal with specific needs and concerns relating to habitat gardening and these particular animal groups. Next comes a problem-solving section in which learners deal with potential problems related to wildlife habitat gardening. Finally, the concluding section consists of life skill and career exploration lessons related to habitat gardening. The Backyard Buddies curriculum is currently awaiting review. Following review and any necessary revisions, the curriculum will be pilot tested and, again, will undergo any necessary revisions. Then, artwork, graphics, and layout will be designed prior to the curriculum's publication and implementation.

Meche, Michelle S

2001-01-01T23:59:59.000Z

425

EM-421  

Office of Legacy Management (LM)

NY-W] NY-W] ' qc-,p,,4 ,P -pIj i; ,./&+e~--- ,jJs AIJG 0 2 130 EM-421 Addition of Sites to FUSRAP Lester K. Price, Director Technical Services,Division Oak Ridge Operations Office Attached is a memorandum approving transfer of responsibility for the Niagara Falls Storage Site (NFSS) in New York and the New Brunswick Laboratory (NBL) Site in New Jersey to FUSRAP. Please incorporate these sites in the FUSRAP rebaselining effort now underway. As we previously discussed, funding for NBL will provide for continued surveillance and maintenance activities at the site and will be borne by FUSRAP beginning in FY 1991. Funding for NFSS will be provided under B&R AH1020 for FY 1991 and will be borne by FUSRAP thereafter. If you have any questions in this regard, call me at FTS 233-4937.

426

Not a Babe in the Woods: Using MotorMaster Software to Make Sophisticated Electric Motor Purchase Decisions  

E-Print Network (OSTI)

Three-phase motors use more than half of all electricity in the United States. Energy efficient models are available in most motor classes in the 1 to 500 horsepower range, offering simple pay backs under two years. In practice, few motor buyers have performed an economic analysis, resulting in missed energy and dollar savings. MotorMaster software helps identify the best motor for a specific application. Its database of 9,000 motors includes the majority of three-phase motors sold in the United State. Performance information such as Full-Load RPM, torque and amperage rating identify models that meet specific design criteria. MotorMaster calculates operating costs and simple paybacks. This paper reviews the importance of proper electric motor selection and explains how MotorMaster software can be used to identify the most efficient, cost effective and reliable motor for each specific application.

Litman, T.

1993-03-01T23:59:59.000Z

427

EMS Division Potential Benefits of Selected  

E-Print Network (OSTI)

Validation Program for ONR 300 KW Test Stand Motor 3.7 MW Motor Operated Successfully with SC magnet at full Homopolar Motors & Projections for Ship Propulsion Topics NOTE: Search for the interplay of technical disciplines!!!!! #12;EMS Division Homopolar Motor Outline ·Homopolar Motor Basics ·Homopolar Motor Technology

428

Report: EM Communications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Communications EM Communications August 24, 2006 Submitted by: The EMAB Communications Team Background: At the March 2006 Environmental Management Advisory Board (EMAB) meeting, the Assistant Secretary for Environmental Management (EM) and his staff unveiled the proposed organization for EM. The purpose of the reorganization is to structure the workforce across the EM complex in a way that could ensure maximum and sustained focus on EM's mission -"to complete the cleanup of the contaminated nuclear weapons manufacturing and testing sites across the United States". After the presentation, EMAB members noted that a separate communications function was not included in the proposed organization, which EM staff acknowledged was a possible, unmet need.

429

Oak Ridge's EM Program Seeks Public Input on Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeks Public Input on Cleanup Seeks Public Input on Cleanup Oak Ridge's EM Program Seeks Public Input on Cleanup April 25, 2013 - 12:00pm Addthis Oak Ridge’s EM leadership informed members of the public about projects and goals and answered questions during a public workshop this week. Oak Ridge's EM leadership informed members of the public about projects and goals and answered questions during a public workshop this week. Local residents and other stakeholders listen to Oak Ridge's EM senior leadership in a public workshop to learn about EM and provide input about future mission work. Local residents and other stakeholders listen to Oak Ridge's EM senior leadership in a public workshop to learn about EM and provide input about future mission work. Oak Ridge EM Manager Mark Whitney addresses participants on EM’s mission and priorities.

430

EM News Flashes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 21, 2013 June 21, 2013 Associate Principal Deputy Assistant Secretary Alice Williams, left, and EM Senior Advisor Dave Huizenga, center, talk with Environmental Management Advisory Board Vice-Chair Dennis Ferrigno at the recent board meeting. EM Reviews Budget, Technology Challenges with Advisory Board EM leadership met with the Environmental Management Advisory Board (EMAB) recently to discuss a range of topics, from EM's fiscal year 2014 budget request to its technology challenges. June 20, 2013 At Tuesday's Grand County Council meeting in Utah, Moab Federal Project Director Donald Metzler, center, moves a piece from a plaque representing Moab's uranium mill tailings pile to a plaque representing the disposal cell in recognition of the site achieving a milestone by shipping 6 million tons of the tailings. Grand County Council Chair Gene Ciarus is on the left and Grand County Council Vice Chair Lynn Jackson is on the right.

431

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

432

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and objectives * Carbon gasification * Carbon reactivity studies * Catalyst development * Techno-economic analysis * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

433

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Improved Caprock Integrity and Improved Caprock Integrity and Risk Assessment Techniques Project Number (FE0009168) Michael Bruno, PhD, PE GeoMechanics Technologies U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Introduction and Motivation 2 A primary requirement for long-term geologic storage and containment of carbon dioxide is ensuring caprock integrity. Large-scale CO2 injection requires improved and advanced simulation tools and risk assessment techniques to better predict and help control system failures, and to enhance performance of geologic storage. GeoMechanics Technologies is developing enhanced simulation and risk analysis approaches to assess and

434

Irene Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Irene Station, African Weather Bureau Irene Station, African Weather Bureau The photos on this site come from the Southern Hemisphere Additional Ozonesondes (SHADOZ) project. Additional photos can be found on the SHADOZ Project Web Site. Photo of the Dobson 89 Instrument The Irene Weather Office Agnes Phahlane sits behind the Dobson and collects Total Ozone Data The lab at the Irene station Cal Archer Prepares an ozonesonde Flight Preparations The balloon is readied The release Back to the SAFARI 2000 Photo Page Index Other Sites: Skukuza, MISR Validation Site | Skukuza, Eddy Covariance Site | C-130 Flight Photos | Sua Pan Site | Irene Weather Station | Fire Studies | Kalahari Transect | Kalahari Transect Sites for Canopy Structure Data | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data

435

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

436

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Basin-Scale Leakage Risks from Basin-Scale Leakage Risks from Geologic Carbon Sequestration: Impact on CCS Energy Market Competitiveness Catherine A. Peters Jeffery P. Fitts Michael A. Celia Princeton University Paul D. Kalb Vatsal Bhatt Brookhaven National Laboratory Elizabeth J. Wilson Jeffrey M. Bielicki Melisa Pollak University of Minnesota DOE Award DE-FE0000749 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to CCUS research program * Project Goals & Objectives * Technical Status  Thrust I - Reservoir-scale simulations of leakage potential with permeability evolution

437

Project Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Description Project Description The Energy Policy Act of 2005 (EPAct 2005), the Energy Independence and Security Act of 2007 (EISA 2007), and Presidential Executive Order 13423 all contain requirements for Federal facilities to decrease energy consumption and increase the use of renewable energy by the year 2015. To provide leadership in meeting these requirements, DOE, in partnership with the General Services Administration (GSA), has installed a rooftop solar electric, or PV, system on the roof of DOE's headquarters in Washington, D.C. The 205 kilowatt (kW) installation is one of the largest of its kind in the Nation's capital. A display in the For- restal building will show the power output of the PV system during the day and the energy produced over

438

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

for Modeling CO for Modeling CO 2 Processes: Pressure Management, Basin-Scale Models, Model Comparison, and Stochastic Inversion ESD09-056 Jens T. Birkholzer with Abdullah Cihan, Marco Bianchi, Quanlin Zhou, Xiaoyi Liu, Sumit Mukhopadhyay, Dorothee Rebscher, Barbara Fialeix Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview and Technical Status - Task 1: Optimization of Brine Extraction for Pressure Management and Mitigation - Task 2: Basin-scale Simulation of CO 2 Storage in the Northern Plains - Prairie Basal Aquifer - Task 3: Sim-SEQ Model Comparison

439

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

440

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Kansas Center for Research University of Kansas Center for Research Kansas Geological Survey U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 Presentation Outline * Benefits, objectives, overview * Methods * Background & setting * Technical status * Accomplishments * Summary Benefit to the Program * Program goal addressed: Develop technologies that will support the industries' ability to predict CO 2 storage capacity in geologic formations to within ± 30 percent. * Program goal addressed: This project will confirm - via a horizontal test boring - whether fracture attributes derived from 3-D seismic PSDM Volumetric Curvature (VC) processing are real. If

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project benefits and objectives * Carbon reactivity studies * Catalyst mechanism studies * Catalyst development * Test results * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

442

FUSRAP Project  

Office of Legacy Management (LM)

Project Project 23b 14501 FUSRAP TECHNICAL BULLETIN N O . - R 3 v . L DATE: 1.2 9-99 SUBJECT : Pr.pec.d BY T r m L u d Approval Summary of the results for the Springdale characterization activities performed per WI-94-015, Rev. 0. TUO separate radiological characterization surveys and a limited cherical characterization survey were performed on the Springdale Site in Octcjer and December, 1993. The design of the radiological surveys were to supplement and define existing ORNL surveys. The limited cher.ica1 characterization survey was performed to assist in the completion of waste disposal paperwork. Radiological contamination is primarily ir. the 'belt cutting and belt fabrication'areas of the building with a small erea of contamination in the south end of the building. The chemiccl sac~le

443

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigating the Fundamental Investigating the Fundamental Scientific Issues Affecting the Long-term Geologic Storage of Carbon Dioxide Project Number DE-FE0000397 Lee H Spangler Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Computational tool development * Laboratory studies to understand subsurface CO 2 behavior * Analog studies to inform risk analysis * Near surface detection technologies / testing * Mitigation method development 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

444

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

445

Project 307  

NLE Websites -- All DOE Office Websites (Extended Search)

INTEGRATING MONO ETHANOL AMINE (MEA) INTEGRATING MONO ETHANOL AMINE (MEA) REGENERATION WITH CO 2 COMPRESSION AND PEAKING TO REDUCE CO 2 CAPTURE COSTS Background In Phase I, Trimeric Corporation, in collaboration with the University of Texas at Austin, performed engineering and economic analyses necessary to determine the feasibility of novel MEA processing schemes aimed at reducing the cost of CO 2 capture from flue gas. These novel MEA-based CO 2 capture schemes are designed for integration into coal-fired power plants with the aim of reducing costs and improving efficiency. Primary Project Goal The primary goal of this project was to reduce the cost of MEA scrubbing for the recovery of CO 2 from flue gas by improved process integration. CONTACTS Sean I. Plasynski Sequestration Technology Manager

446

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline * Benefit to the program * Project overview: Why 14 C for MVA? * Technical status: Cartridges, injections, lasers * Summary * Organizational chart * Collaborators 3 Benefit to the Program * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Permanent storage of CO 2 can be demonstrated by adding carbon-14 ( 14 C) prior to injection. This research project aims to demonstrate this by tagging fossil CO 2 with 14 C at a field site. When completed, this system will show that 14 C can be a safe and effective tracer for sequestered CO 2 . A laser-based 14 C measurement method is being adapted for continuous monitoring. This technology contributes to the Carbon Storage Program's effort of ensuring 99 percent

447

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Pathways and Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2 Project DE-FC26-0xNT4 FE0001786 James P. Evans Utah State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Goals and Objectives * Relationship to overall program goals * Overview of seal bypass * Technical status; bypass systems - Field based studies - Technological advances * Accomplishments and Summary * Appendices 3 Benefit to the Program * Program goals addressed * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

448

Project 301  

NLE Websites -- All DOE Office Websites (Extended Search)

2006 2006 Combustion Technologies CONTACTS Robert R. Romanosky Advanced Research Technology Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4721 robert.romanosky@netl.doe.gov Arun C. Bose Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4467 arun.bose@netl.doe.gov ADVANCED, LOW/ZERO EMISSION BOILER DESIGN AND OPERATION Background Over the past years, environmental concerns regarding pollutants have grown dramatically. Current annual greenhouse gas (GHG) emissions are 12% higher than they were in 1992. In addition, carbon dioxide (CO 2 ) emissions are projected to increase by an additional 34% over the next 20 years. About one third of carbon emissions in the

449

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

450

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

451

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mart Oostrom Mart Oostrom Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline  Project overview  Sub-Task 1: Investigation of CO 2 migration in heterogeneous porous media  Sub-Task 2: Modeling CCUS deployment in China  Summary Collaboration with China on Clean Energy Research 3 Benefit to the Program The Clean Energy Partnership was established by a memorandum of understanding between the Chinese Academy of Sciences, the National Energy Technology Laboratory and the Pacific Northwest National Laboratory in May of 2009 with the goal of significantly reducing the environmental emissions and improving the efficiency of

452

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

453

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

454

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Thomas J. Wolery Thomas J. Wolery Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 LLNL-PRES-574632 2 Team Members * Roger Aines * Bill Bourcier * Tom Wolery * Tom Buscheck * Tom Wolfe (consultant) * Mike DiFilippo (consultant) * Larry Lien (Membrane Development Specialists) 3 Presentation Outline * Overview of Active CO 2 Reservoir Management (ACRM) * Subsurface Reservoir Management: Made Possible by Brine Production, Yielding Many Benefits * Brine Disposal Options - What brines are out there? - What are the treatment options? 4 Benefit to the Program * This project is identifying and evaluating

455

Project Payette  

SciTech Connect

This is the concept for Project Payette, a nuclear event in the Seismic Detection Research Program. For this experiment, a nuclear explosive in the range of 5 to 10 kt will be detonated at a depth of 2000 to 3000 ft in an underground cavity of sufficient size that the walls of the cavity experience only elastic motion. The site will be located in a salt dome. Project Payette has been divided into three phases. Phase I will include site evaluation and engineering design of the construction of the cavity. It is estimated to require about 1 year. Phase II will include construction of the cavity and emplacement hole. It is estimated to require about 2 years. Phase III will include emplacement of instruments and the device, the detonation and the post-shot program including cavity re-entry. This is estimated to require about 1 year. The scope of this concept is intended to define Project Payette sufficiently will that Phase I work may proceed.

Warner, D.

1966-08-01T23:59:59.000Z

456

West Valley Demonstration Project Phase I Decommissioning - Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Phase I Decommissioning - Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement West Valley Demonstration Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement The Department of Energy, West Valley Demonstration Project (DOE-WVDP) and CH2M Hill B&W West Valley (CHBWV) are committed to continuous improvement and will utilize principles of the DOE Environmental Management (DOE-EM) Partnering Policy to create and foster a team environment to successfully complete the West Valley Demonstration Project (WVDP) Phase I Decommissioning - Faciltiy Disposition. West Valley Demonstration Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement More Documents & Publications CX-009527: Categorical Exclusion Determination

457

EM Newsletters | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Newsletters Newsletters EM Newsletters RSS December 24, 2013 Workers have removed more than 25 percent of the process gas equipment from the X-326 facility since starting that work in 2012. This past year they removed 54 of 200 cells. Once the equipment is removed, the 30-acre building will be ready for demolition. Portsmouth Site Closes a Busy Year with Several D&D Project Completions PIKETON, Ohio - Decontamination and decommissioning (D&D) of several Cold War uranium enrichment facilities capped a busy year for the EM program at the Portsmouth site. The 3,700-acre reservation includes more than 400 buildings and systems that will be part of cleanup operations to ensure the site is ready for future use. December 24, 2013 Unusually heavy rain in early September caused flash flooding in canyons surrounding Los Alamos.

458

EM News | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 29, 2013 April 29, 2013 Robert Brown, SRR tank farm operator, performs daily inspections of a salt disposition process facility. The inspections and improvement upgrades have resulted in continued successful operations. Salt Waste Contractor Reaches Contract Milestone AIKEN, S.C. - The liquid waste cleanup contractor for the EM program at the Savannah River Site (SRS) recently surpassed a 2013 contract milestone by processing more than 600,000 gallons of salt waste. April 29, 2013 Environmental sampling helps identify which reservation locations are not contaminated. Oak Ridge Project Opens Possibilities for Future Mission Work, Development OAK RIDGE, Tenn. - EM is refining the picture of uncontaminated areas within the 33,500-acre Oak Ridge Reservation through a review of historic

459

EM Receives Several Honors in 2011 DOE Sustainability Awards | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Receives Several Honors in 2011 DOE Sustainability Awards EM Receives Several Honors in 2011 DOE Sustainability Awards EM Receives Several Honors in 2011 DOE Sustainability Awards November 4, 2011 - 12:00pm Addthis Several EM employees, projects and teams were honored as part of the 2011 DOE Sustainability Awards announced this week. The awards recognize the achievements of DOE employees who saved taxpayer money by reducing the Department's use of energy, water, and paper, while improving the energy efficiency of government buildings and vehicles. EM award winners include an American Recovery and Reinvestment Act project to remediate tritium-contaminated debris at the Savannah River Site in an innovative, cost-effective way; the East Tennessee Technology Park, which was recognized for uniquely applying technology to create a paperless

460

Revised Master Plan for the Hood River Production Program, Technical Report 2008.  

DOE Green Energy (OSTI)

The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt-to-adult (SAR) survival rate guidelines. The observed low SAR was due to precocity, straying, and incidence of BKD in the spring Chinook program; which ultimately led to the program's inability to achieve the subbasin's overly optimistic biological fish objectives. The summer steelhead hatchery program was not providing the fishery or population benefits anticipated and will be discontinued. The winter steelhead program was performing as planned and no changes are foreseen. This updated Master Plan addresses the several proposed changes to the existing HRPP, which are described.

Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

2008-04-28T23:59:59.000Z

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

462

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

William Bourcier William Bourcier Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Saline Aquifer Brine Production Well Brine Injection Well Chiller Pretreatment Desalination Brine Permeate To power plant or other use Storage pump CO 2 injection Concept is to extract and desalinate aquifer brines to create fresh water and space for CO 2 storage cap-rock 3 Presentation Outline * Overview, Purpose, Goals and Benefits * Technical status - Brine treatment and disposition - Reservoir management * Accomplishments * Summary and Planned work Goals and Objectives Technical Goals Potential advantages of brine

463

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Metrics for Screening CO Metrics for Screening CO 2 Utilization Processes Peter Kabatek Energy Sector Planning and Analysis (ESPA) Services / WorleyParsons U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * NETL's Carbon Storage Program * Introduction of the metrics * Review of the case study technology * Application of metrics to the case study technology * Discussion of metrics interpretation and grouping 3 NETL Carbon Storage Program * The Carbon Storage Program contains three key elements: - Infrastructure - Global Collaborations - Core Research and Development: * Monitoring, Verification and Accounting (MVA) * Geologic Storage

464

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Reservoir Simulation Model * Intelligent Leakage Detection System (ILDS) * Accomplishments * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. CO2 Leakage(X,Y,Q) Artificial Intelligence & Data Mining Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 : * Conference call * Site selection criteria - November 17 th 2009: * A meeting during the Regional Carbon Sequestration Partnership Meeting in Pittsburgh

465

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

466

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Training and Research Peter M. Walsh University of Alabama at Birmingham U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh, Pennsylvania August 21-23, 2012 DE-FE0002224 * Evaluation of the sealing capacity of caprocks serving as barriers to upward migration of CO 2 sequestered in geologic formations. * Education and training of undergraduate and graduate students, through independent research on geologic sequestration. * Education, through an advanced undergraduate/graduate level course on coal combustion and gasification, climate change, and carbon sequestration. * Simulation of CO 2 migration and trapping in storage

467

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction - Objective - Industrial Review Committee - Background * Steps Involved - Geological and Reservoir Simulation Modeling - Leakage Modeling & Real-Time Data Processing - Pattern Recognition & Intelligent Leakage Detection System (ILDS) * Accomplishments to Date * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 :

468

Project Rulison  

Office of Legacy Management (LM)

Rulison Rulison 1970 Environmerstal Surveillance Summary Report J - - Colorado Department of Health DIVISION OF OCCUPATIONAL AND RADIOLOGICAL HEALTH DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. STATE OF COLORADO P R O J E C T R U L I S O N Environments 1 S u r v e i l l a n c e Summary R e p o r t C o l o r a d o D e p a r t m e n t o f H e a l t h D i v i s i o n o f O c c u p a t i o n a l and R a d i o l o g i c a l 3 e a l t h This page intentionally left blank FOREWORD Project Rulison is an experimental Plowshare project undertaken cooperatively by the Atomic Energy Commission (AEC) and the Department of Interior for the government, and Austral Oil Company and CER Geo- nuclear Corporation for private industry. As required by law, the AEC

469

Definition of Environmental Management (EM) Completion | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2) the specific activities that need to be accomplished before the Office of Environmental Management's (EM) responsibility for a site, or portions of a site, is complete. Definition of Environmental Management (EM) Completion More Documents & Publications EM SSAB Conference Calls - January 27, 2011 Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet

470

EM Hosts Second Contract Performance and Management Workshop in 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Hosts Second Contract Performance and Management Workshop in EM Hosts Second Contract Performance and Management Workshop in 2012 EM Hosts Second Contract Performance and Management Workshop in 2012 August 29, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM hosted its second Environmental Management Contract Performance and Management Workshop at DOE headquarters today. The goal of the workshop was to identify opportunities related to EM's goal to improve project, budget and contract management with the objective of delivering results on time, within cost and with world-class technical competencies. Participants in the workshop laid out steps to successfully implement opportunities identified to improve contract management at the first EM contract performance and management workshop held in February. In addition to DOE senior leadership, participants included corporate

471

Master problem approximations in Dantzig-Wolfe decomposition of variational inequality problems with applications to two energy market models  

Science Conference Proceedings (OSTI)

In this paper, a modification to Dantzig-Wolfe (DW) decomposition algorithm for variational inequality (VI) problems is considered to alleviate the computational burden and to facilitate model management and maintenance. As proposals from DW subproblems ... Keywords: Approximation of the master problem, Dantzig-Wolfe decomposition, Equilibrium modeling, Variational inequalities

Emre ÇElebi, J. David Fuller

2013-11-01T23:59:59.000Z

472

The Microsoft Certified Master (MCM) program draws its strength from deep, hands-on product expertise delivered by instructors  

E-Print Network (OSTI)

: Directory program. Walter joined Microsoft in 2004 as a Senior Consultant in the Washington, DC, area prior technical content. Kimberly is the President and Founder of SQLskills.com. Windows Server 2008: Directory Walter Boyd is the Program Manager leading the Microsoft Certified Master: Windows Server® 2008

Fähndrich, Manuel A.

473

Technical Services Contract Awarded for West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Services Contract Awarded for West Valley Demonstration Technical Services Contract Awarded for West Valley Demonstration Project Support Services Technical Services Contract Awarded for West Valley Demonstration Project Support Services February 21, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a task order to Safety and Ecology Corporation of Knoxville, Tennessee, for technical services at the West Valley Demonstration Project, West Valley, New York. The task order has a three-year performance period with a $1.3 million value. The task order will be issued from the Indefinite Delivery/Indefinite Quantity (ID/IQ) master contract, firm-fixed-price and time and materials. Under the task order, Safety and Ecology Corporation will perform technical

474

Deputy Assistant Secretary for Acquisition and Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surash Surash Deputy Assistant Secretary for Acquisition and Project Management Office of Environmental Management United States Department of Energy Contract Management by the Department of Energy's Office of Environmental Management Before the Subcommittee on Financial and Contracting Oversight Committee on Homeland Security and Governmental Affairs United States Senate June 27, 2013 Good morning, Madam Chairman, Ranking Member Johnson, and Members of the Subcommittee. Thank you for this opportunity to provide you an overview of the Department of Energy's Office of Environmental Management (EM) acquisitions and of contract and project management reforms that EM is implementing. I am Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management (APM) in

475

Project 320  

NLE Websites -- All DOE Office Websites (Extended Search)

Philip Goldberg Philip Goldberg Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-5806 philip.goldberg@netl.doe.gov Marek Wojtowicz Advanced Fuel Research, Inc. 87 Church Street East Hartford, CT 06108 860-528-9806 marek@AFRinc.com Sequestration CARBON DIOXIDE RECOVERY FROM COMBUSTION FLUE GAS USING CARBON- SUPPORTED AMINE SORBENTS Background In Phase I, Advanced Fuel Research, Inc. will initiate development of a novel sorbent for the removal of carbon dioxide from combustion/incineration flue gas. The sorbent, based on amines supported on low-cost activated carbon, will be produced from scrap tires. Liquid-based amine systems are limited to relatively low concentrations to avoid corrosion. Corrosion should not be a

476

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

477

Project Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hybrid Generation Simulator Hybrid Generation Simulator HybSim© 1.0 DAVID TRUJILLO SANDIA NATIONAL LABORATORY Presented by Joshua Bartlett - University of Michigan Introduction * HybSim© 1.0 copyrighted 2006 * First license to University of Michigan Introduction HybSim© Model What - "Hybrid Simulator"; Tool designed to evaluate the economic and environmental benefits of adding renewable energy to the fossil fuel generation mix in remote and difficult-accessible locations. Why - Benefits of energy storage, decision analysis, risk analysis, load growth issues, load management, economic analysis, planning (what-ifs) Who - Availability to coops, field techs, project managers, administrative personnel Where - Remote villages, military installations, remote industrial systems; any climate

478

Project 328  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CONTACTS Gary J. Stiegel Gasification Technology Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4499 gary.stiegel@netl.doe.gov Jenny Tennant Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4830 Jenny.Tennant@netl.doe.gov Gasification Technologies Conceptual drawing of Rocketdyne's gasification system ADVANCED GASIFICATION SYSTEMS DEVELOPMENT Description Rocketdyne will apply rocket engine technology to gasifier design, allowing for a paradigm shift in gasifier function, resulting in significant improvements in capital and maintenance costs. Its new gasifier will be an oxygen-blown, dry-feed, plug-flow entrained reactor able to achieve carbon conversions of nearly 100 percent by rapidly heating low coal particles

479

Project 199  

NLE Websites -- All DOE Office Websites (Extended Search)

Heino Beckert Heino Beckert Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4132 heino.beckert@netl.doe.gov Ramin Yazdani Senior Civil Engineer Yolo County Planning and Public Works Department 292 West Beamer Street Woodland, CA 95695 530-666-8848 ryazdani@yolocounty.org Sequestration Yolo County Landfill Methane Production Compared to Other Landfills FULL-SCALE BIOREACTOR LANDFILL Background Sanitary landfilling is the dominant method of solid waste disposal in the United States, accounting for the disposal of about 217 million tons of waste annually (U.S. EPA, 1997). The annual production of municipal waste in the United States has more than doubled since 1960. In spite of increasing rates of reuse and recycling, population and

480

Project 258  

NLE Websites -- All DOE Office Websites (Extended Search)

MONITORING POWER PLANT EFFICIENCY USING MONITORING POWER PLANT EFFICIENCY USING THE MICROWAVE-EXCITED PHOTOACOUSTIC EFFECT TO MEASURE UNBURNED CARBON Objective The objective of this project is to explore the use of the microwave-excited photoacoustic (MEPA) effect for quantitative analysis of unburned carbon in fly ash, an extremely important parameter to the electric utility industry. Specific objectives include: * Determine factors that influence accuracy and precision of the MEPA effect; * Evaluate the microwave spectra of fly ash and other divided solids of importance to the power industry; and * Determine the feasibility of an on-line carbon-in-ash monitor based on the MEPA effect. Benefits High carbon levels in coal ash indicate poor combustion efficiency, resulting in additional fuel requirements and higher emissions of pollutants, such as acid-rain

Note: This page contains sample records for the topic "master em project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Project311  

NLE Websites -- All DOE Office Websites (Extended Search)

Lang Lang Project Manager National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4881 david.lang@netl.doe.gov John Bowser Principal Investigator Compact Membrane Systems, Inc. 325 Water Street Wilmington, DE 19804 302-999-7996 john.bowser@compactmembrane.com Sequestration CARBON DIOXIDE CAPTURE FROM LARGE POINT SOURCES Background Capture of carbon dioxide at the source of its emission has been a major focus in greenhouse gas emission control. Current technologies used for capturing CO 2 suffer from inefficient mass transfer and economics. In Phase I, Compact Membrane Systems, Inc. will fabricate and test a membrane-based absorption system for the removal of carbon dioxide from a simulated power-plant flue gas. The stability of the membrane system under various operating conditions

482

MONTICELLO PROJECTS  

Office of Legacy Management (LM)

09 09 January 2010 Doc. No. S06172 Page 1 1.3 Peripheral Properties (Private and City-Owned) * No land use or supplemental standards compliance issues were observed or reported by LTSM on-site staff. Monticello National Priorities List Sites Federal Facilities Agreement (FFA) Quarterly Report: October 1-December 31, 2009 This report summarizes project status and activities implemented October through December 2009, and provides a schedule of near-term activities for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) sites. This report also includes disposal cell and Pond 4 leachate collection data, quarterly site inspection reports, site meteorological data, and a performance summary for the ex situ groundwater treatment system.

483

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Water-Rock Interactions Water-Rock Interactions and the Integrity of Hydrodynamic Seals FWP FE-10-001 Bill Carey Los Alamos National Laboratory Los Alamos, NM U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program Goal: Ensure retention of 99% of injected CO 2 * Focus: Wellbore integrity * Approach: Use field, experimental and computational methods - Determine long-term compatibility of wellbore materials with CO 2 - Determine leakage mechanisms - Predict well performance * Benefit: The research will provide a basis for evaluating the long-term performance of wells, guide remediation

484

Project 371  

NLE Websites -- All DOE Office Websites (Extended Search)

Brent Marquis Brent Marquis Project Manager Sensor Research and Development 17 Godfrey Dr. Orono, ME. 04473 207-866-0100 ext. 241 SEMI-CONDUCTOR METAL OXIDE TECHNOLOGY FOR IN SITU DETECTION OF COAL-FIRED COMBUSTION GASES Description Sensor Research and Development Corporation is developing a robust prototype sensor system for in situ, real-time detection, identification, and measurement of coal-fired combustion gases. The sensor system is comprised of several unique semi-conducting metal oxide (SMO) sensor arrays in tandem with novel gas prefiltration techniques. The sensor array will be able to selectively detect and measure nitric oxide (NO), nitrogen dioxide (NO 2 ), sulfur dioxide (SO 2 ), carbon dioxide (CO 2 ), carbon monoxide (CO), and ammonia (NH 3 ). The SMO sensor array is the heart of the combustion gas analyzer being developed

485

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Ketzin Collaboration Ketzin Collaboration ESD-09-056 Barry Freifeld Earth Sciences Division Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and objectives * Success Criteria * Technical Status * Latest developments in Integrated Monitoring * Summary and Lessons Learned 3 Image from: www.co2ketzin.de 4 Benefit to the Program * Program goal being addressed: - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * The Ketzin collaboration leverages information gained through the mid-scale geological sequestration experiment in Ketzin, Germany.

486

Project 298  

NLE Websites -- All DOE Office Websites (Extended Search)

Reaction Engineering Reaction Engineering International Salt Lake City, UT www.reacti