  1. Master EM Project Definition Rating Index - Facility Disposition...

    Office of Environmental Management (EM)

    ... both approved and pending changes, as appropriate. The forecast of cost at completion is a reasonable projection based on the status of the project and the experience to-date. ...

  2. Master EM Project Definition Rating Index - Traditional (Conventional...

    Office of Environmental Management (EM)

    ... both approved and pending changes, as appropriate. The forecast of cost at completion is a reasonable projection based on the status of the project and the experience to-date. ...

  3. Master EM Project Definition Rating Index - Environmental Restoration...

    Office of Environmental Management (EM)

    ... both approved and pending changes, as appropriate. The forecast of cost at completion is a reasonable projection based on the status of the project and the experience to-date. ...

  4. EM Current Project Performance

    Broader source: Energy.gov [DOE]

    In the spirit of promoting transparency with stakeholders and the public, the Office of Environmental Management (EM) posts key project management information on its website. This document provides...

  5. EM Capital Asset Project List

    Broader source: Energy.gov [DOE]

    Read the EM Capital Asset Project List, which includes the project's name, site, current critical decision and current total project cost.

  6. EM Contractors for Capital Asset Projects

    Broader source: Energy.gov [DOE]

    Read the EM Contractors for Capital Asset Projects list, which includes the project name, number, site, and contractor.

  7. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    SciTech Connect (OSTI)

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a result of

  8. EM Projects Perspective

    Broader source: Energy.gov [DOE]

    Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management March 22, 2016

  9. EM International Collaboration and Cooperation Project Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM International Collaboration and Cooperation Project Information [Title of project] [Fiscal Year] Revision [#] [Submittal Date] Collaborators International Collaborator Country: [Proper Sovereign Nation Name] Foreign Organization: [Proper Organization Name] Lead Principal Investigator: [Name] [E-mail] [Phone] US Collaborators EM-HQ Mission Unit: [DAS and OD] EM Field/Project Office: [Site/Project Name] EM-HQ Sponsor: [Name] [Title/Position] [E-mail] [Phone] EM-Field POC: [Name]

  10. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  11. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management EM Projects Perspective - Jack Surash, Deputy ...

  12. LLNL line-item construction projects Master Site Plan

    SciTech Connect (OSTI)

    1996-04-15

    This interim submittal is an updated 1996 overview of the Master Plan based on the 1995 LLNL Site Development Plan, illustrating the future land use considerations, and the locations of proposed facilities as documented through the line item development process and keyed to the summary table. The following components in addition to the line-item proposals remain key elements in the implementation strategy of the Master Plan: personnel migration, revitalization, space reduction, classified core contraction, utility systems, and environmental restoration.

  13. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition and Project Management, Environmental Management | Department of Energy EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management Presentation Topics EM Funding Evolution of EM Contracts EM Portfolio Project Success Workshop 2015 -Jack Surash_EM Projects Perspective.pdf (2.14 MB)

  14. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  15. Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ITR Landfill Assessment Project Lessons Learned Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned By: Craig H. Benson, PhD, PE Where: EM SSAB Teleconference: 1 ...

  16. DOE EM Project Experience & Lessons Learned for In Situ Decommissionin...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) The purpose of ...

  17. Poneman Joins EM Contract and Project Management Workshop | Department...

    Office of Environmental Management (EM)

    Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop June 7, 2013 - 12:00pm Addthis Deputy Secretary Daniel Poneman ...

  18. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Quality Assurance EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010 EM Quality Assurance Centralized Training Platform Project...

  19. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    SciTech Connect (OSTI)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

  20. Decision tool to optimally select pollution prevention projects within a constrained budget. Master`s thesis

    SciTech Connect (OSTI)

    Hudson, C.

    1995-12-01

    Pollution prevention managers need to select the best environmental projects for an installation within a constrained budget but have no standard way of selecting the optimal mix of projects. This thesis proposes a decision tool to aid decision makers in choosing this optimal mix. The model was built using decision analysis theory which provides a framework to aid the decision maker. Criteria sed in the model for selection was determined using a questionnaire sent to base-level pollution prevention managers. The model ses DPL, a software package designed to build, analyze, and conduct sensitivity analysis of decision problems to perform the quantitative analysis. Built in functions of DPL(TM) allow the decision maker to see the optimal decision policy based on the values entered into the model and to run sensitivity analysis to determine which values are the most critical to the outcome of the model. Decision analysis can be used to create a dominance curve that shows all optimal strategies based on the willingness of the decision maker to make tradeoffs between attributes. This model provides analytical data that can be used to justify decisions made by the pollution prevention manager when selecting the optimal mix of pollution prevention projects for implementation.

  1. CVEN 6960 master's project, investigation of a cooling coil in high humidity conditions. Master's thesis

    SciTech Connect (OSTI)

    Sloop, R.E.

    1993-12-10

    The primary purpose of this project is to validate the HVAC*2 Toolkit calculations for a cooling coil in high humidity conditions. A total of 19 experimental runs at different entering air temperature and humidity conditions were performed at the Joint Center for Energy Management HVAC Laboratory that exposed a cooling coil to temperature and humidity conditions that are typically found in the southern United States. The inlet conditions and manufacturer's coil rating data was used as input to the HVAC*2 Toolkit simple cooling coil subroutine (CCSIM). The predicted results from the toolkit were then compared to the experimental results.

  2. ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 PDF icon Rocky Flats Closure Project-Lessons Learned-August 2006.pdf More Documents & Publications...

  3. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  4. Support EM LA Airport Landfill Cover Project by providing 40000...

    Office of Environmental Management (EM)

    Support EM LA Airport Landfill Cover Project by providing 40000 tons of soil Support EM LA Airport Landfill Cover Project by providing 40000 tons of soil DE-DT0010454-Task-Order-4 ...

  5. EM Employees Engage in Interactive Workshop on Contract, Project...

    Office of Environmental Management (EM)

    Employees Engage in Interactive Workshop on Contract, Project Management Improvements EM Employees Engage in Interactive Workshop on Contract, Project Management Improvements June ...

  6. ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 | Department of Energy

    Energy Savers [EERE]

    AUG 2006 ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 PDF icon Rocky Flats Closure Project-Lessons Learned-August 2006.pdf More Documents & Publications Rocky Flats Overview...

  7. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel. PDF icon EM Quality ...

  8. Recovery Act Investment Moves EM Past Milestone of 100 Project...

    Office of Environmental Management (EM)

    in place quickly to accomplish the Recovery Act Program goals." Recovery Act Investment Moves EM Past Milestone of 100 Project Completions Below: Recovery Act workers...

  9. EM International Project Submission Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Submission Template EM International Project Submission Template The template below is used for International Project Submission. Project Submission Template (392.48 KB) More Documents & Publications DOE Source Evaluation Board (SEB) Document Templates Interagency Agreement for U.S. Department of Energy Project Facilitator Support Form FEMP Services Interagency Agreement for DOE ESPC Support

  10. EM Focuses on Contract, Project Management Improvements in Three-Day Workshop

    Broader source: Energy.gov [DOE]

    ORLANDO, Fla. – EM held a three-day workshop in Orlando this month focusing on strategies to improve contract and project management across the EM complex.

  11. EM Current Project Performance_July.xls

    Office of Environmental Management (EM)

    Energy Convenes Historic Meeting with Leaders of Tribal Nations EM Convenes Historic Meeting with Leaders of Tribal Nations June 20, 2012 - 12:00pm Addthis Senior Advisor for Environmental Management David Huizenga, fifth from left, and EM Office of External Affairs Director Paul Seidler, first from left, stand for a photo with leaders and staff members of the Tribal Nations while on a tour of the Rocky Flats site following the Tribal Leader Dialogue in Denver on Tuesday. Senior Advisor for

  12. Washoe Wisk'e'em Project

    SciTech Connect (OSTI)

    Tara Hess-McGeown

    2012-03-26

    The Washoe Tribe Wiskem Project (Project) was a Congressionally Directed Project identified for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2010. The Project focused on installing up to four small vertical wind turbines at designated locations on Tribal lands to offset energy costs for the Tribe. The Washoe Tribe will use and analyze data collected from the wind turbines to better understand the wind resource.

  13. EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, D.C. – EM officials wrote a chapter of a recently published book, Managing Nuclear Projects – A Comprehensive Management Resource, which covers a range of areas with emphasis on process, requirements and lessons learned. Authors from France, Germany, Argentina, Belgium, Finland, Austria, and the U.S. contributed to the book.

  14. ISMS/EMS Lessons Learned Disposition Projects at SRS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ISMS/EMS Lessons Learned Disposition Projects at SRS ISMS/EMS Lessons Learned Disposition Projects at SRS August 2009 Presenter: Joan Bozzone, NNSA SRS Track 7-5 Topics Covered: Pu Disposition Projects US Surplus Plutonium Disposition Paths Challenging Characteristics of NNSA Plutonium Disposition Projects MFFF Environmental Features Project Permitting Lessons Learned #1 MOX Environmental Management Project Permitting Lessons Learned #2 MOX Environmental Sustainability Policy ISMS/EMS Lessons

  15. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  16. DOE EM Project Experience & Lessons Learned for In Situ Decommissioning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Feb. 2013) | Department of Energy EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) The purpose of the "DOE EM Project Experience & Lessons Learned for In Situ Decommissioning" report is to capture the considerable technical experience gained to date for implementation of In Situ Decommissioning (ISD) projects at DOE facilities. As current and projected

  17. Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs |

    Office of Environmental Management (EM)

    Department of Energy 4: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs The ORSSAB recommends DOE Quarterly Project Reviews Be Shared with the EM SSABs. Recommendation 174 (324.16 KB) DOE response to recommendation 174 (122.81 KB) More Documents & Publications Recommendation 179: DOE Quarterly Project Reviews Recommendation 173: Recommendation to Support Establishment and Continuation of the Office of

  18. EM's New Project of the Month Focuses on Tribes' Work with Native...

    Office of Environmental Management (EM)

    WASHINGTON, D.C. - EM is highlighting important work by the Confederated Tribes of the Umatilla Indian Reservation in a new Project of the Month on EM's public Web site, ...

  19. Compressed Air System Retrofitting Project Improves Productivity at a Foundry (Cast Masters, Bowling Green, OH)

    SciTech Connect (OSTI)

    2002-06-01

    This case study highlights International Truck and Engine Corporation's optimization project on the compressed air system that serves its foundry, Indianapolis Casting Corporation. Due to the project's implementation, the system's efficiency was greatly improved, allowing the foundry to operate with less compressor capacity, which resulted in reduced energy consumption, significant maintenance savings, and more reliable production.

  20. Project PETROL RAM: improving the management of Air Force fuels operations and inventories. Master's thesis

    SciTech Connect (OSTI)

    Frederick, P.R.

    1988-09-01

    The purpose of this research was to provide a handbook on Project PETROL RAM and its ideas for enhancing the base-level fuels operations. This handbook is to serve as an introduction and reference guide to the components, characteristics, and capabilities of the proposed initiative. In preparing this handbook, available information on the structure, operations, and procedures of a typical base Fuels Management Branch was gathered, then condensed and simplified. For added depth and understanding, personal interviews with personnel involved in the design and development of this project were conducted. The research resulted in a handbook that describes, in simplified terminology, the different systems which are being developed under the Project PETROL RAM initiative.

  1. Directors Advance EM Mission with Help from Rigorous Project Management Program

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Nearly 160 EM employees maintain certifications from a project management program that helps them achieve successful outcomes in the Cold War cleanup.

  2. EM Employees Engage in Interactive Workshop on Contract, Project Management Improvements

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. - EM employees from across the DOE complex met at the Contract and Project Management Workshop this past month to focus on continuous improvements in planning and execution of contracts and projects.

  3. The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-02-11

    The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

  4. Status Report: EM Acquisition and Project Management Review

    Office of Environmental Management (EM)

    ... the contractor community for EM to publish an overall acquisition strategy, without compromising confidential or procurement-sensitive information, thereby issuing advanced notice.

  5. Recovery Act Investment Moves EM Past Milestone of 100 Project Completions

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently paused to observe a notable achievement: completion of more than 100 projects in its $6 billion...

  6. Support EM LA Airport Landfill Cover Project by providing 40000 tons of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    soil | Department of Energy Support EM LA Airport Landfill Cover Project by providing 40000 tons of soil Support EM LA Airport Landfill Cover Project by providing 40000 tons of soil DE-DT0010454-Task-Order-4 Airport Landfill Construction Activities The purpose of this task order (TO) is to support the EM-LA Field Office in replacing the cover at the Los Alamos County Airport Landfill. The new cover design is an evapotranspiration (ET) cover. Contractor: TSAY Corporation DOE Contracting

  7. Fernald Environmental Management Project Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald ...

  8. Miamisburg Environmental Management Project Archived Soil & Groundwate...

    Office of Environmental Management (EM)

    Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports ...

  9. Memo Issuance of EM Capital and Major Operating Project Standard Review Plan Edition Two

    Office of Environmental Management (EM)

    MAR 2 4 201011 MEMORANDUM FOR DISTRIBUTION FROM: DR. STEVEN L. KRAHN DEPUTY ASSISTANT SAFETY AND SECU EIVVIROIVMENTAL MANAGEMENT SUBJECT: Issuance of Environmental Management Capital and Major Operating Project Standard Review Plan Edition Two The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission critical projects/facilities. Effective management of these projects requires multiple disciplines to be

  10. EM Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – EM and its main cleanup contractor at DOE’s Idaho Site recently reached a major project milestone necessary to maintain water quality and continued, safe operations within the site’s spent nuclear fuel storage basin.

  11. EM's Award-Winning Projects Save More Than $10 Million, Advance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainability at Department of Energy | Department of Energy Award-Winning Projects Save More Than $10 Million, Advance Sustainability at Department of Energy EM's Award-Winning Projects Save More Than $10 Million, Advance Sustainability at Department of Energy March 24, 2015 - 10:00am Addthis The SRS Non-Destructive Radionuclide Assay Team, from left, include Steve Mackmull (now retired), DOE-Savannah River; Todd Shepley, Canberra; and Lee Fox and Steve Mentrup, SRNS. Not pictured: Bert

  12. 2015-09-25 EM Current Project Performance.xls

    Office of Environmental Management (EM)

    Date Rebaselines Rebaselined Project Cost Rebaselined Completion Date Site 05-D-405 Salt Waste Processing Facility (SWPF) CD-3 900,000,000 11302013 2 2,322,000,000 131...

  13. Archived Soil & Groundwater Master Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Archived Soil & Groundwater Master Reports Archived Soil & Groundwater Master Reports Archived Soil & Groundwater Master Reports Amchitka Ashtabula Fernald Environmental Management Project Maybell Miamisburg Environmental Management Project Rocky Flats Environmental Technology Site Shiprock Slick Rock South Valley Spook Tuba City Weldon Spring Miscellaneous

  14. Clean-coal technology by-products used in a highway embankment stabilization demonstration project. Master's thesis

    SciTech Connect (OSTI)

    Nodjomian, S.M.

    1994-01-01

    Clean-coal technology by-products are used in a highway embankment demonstration project. This research chronicles the procedures used in the process and analyzes the stability of a repaired highway embankment. The reconstructed slope is analyzed using an Intelligent Discussion Support System that was developed from a slope stability program. Water quality studies are performed and an instrumentation plan is suggested. The calculated factors of safety and the observed embankment performance give indications that the field demonstration project was a success. Long-term monitoring will be the best barometer for determining embankment gross movement and the future of FGD by-products as a stabilizing material.

  15. Constructing Predictive Estimates for Worker Exposure to Radioactivity During Decommissioning: Analysis of Completed Decommissioning Projects - Master Thesis

    SciTech Connect (OSTI)

    Dettmers, Dana Lee; Eide, Steven Arvid

    2002-10-01

    An analysis of completed decommissioning projects is used to construct predictive estimates for worker exposure to radioactivity during decommissioning activities. The preferred organizational method for the completed decommissioning project data is to divide the data by type of facility, whether decommissioning was performed on part of the facility or the complete facility, and the level of radiation within the facility prior to decommissioning (low, medium, or high). Additional data analysis shows that there is not a downward trend in worker exposure data over time. Also, the use of a standard estimate for worker exposure to radioactivity may be a best estimate for low complete storage, high partial storage, and medium reactor facilities; a conservative estimate for some low level of facility radiation facilities (reactor complete, research complete, pits/ponds, other), medium partial process facilities, and high complete research facilities; and an underestimate for the remaining facilities. Limited data are available to compare different decommissioning alternatives, so the available data are reported and no conclusions can been drawn. It is recommended that all DOE sites and the NRC use a similar method to document worker hours, worker exposure to radiation (person-rem), and standard industrial accidents, injuries, and deaths for all completed decommissioning activities.

  16. Master Renovables | Open Energy Information

    Open Energy Info (EERE)

    Master Renovables Jump to: navigation, search Name: Master Renovables Place: Barcelona, Egypt Zip: 8020 Sector: Solar Product: Master Renovables brings solar energy solutions and...

  17. Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the

  18. IDC Integrated Master Plan. (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS...

  19. IDC Integrated Master Plan. Clifford, David J.; Harris, James...

    Office of Scientific and Technical Information (OSTI)

    IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS...

  20. Master-slave micromanipulator method

    DOE Patents [OSTI]

    Morimoto, Alan K.; Kozlowski, David M.; Charles, Steven T.; Spalding, James A.

    1999-01-01

    A method based on precision X-Y stages that are stacked. Attached to arms projecting from each X-Y stage are a set of two axis gimbals. Attached to the gimbals is a rod, which provides motion along the axis of the rod and rotation around its axis. A dual-planar apparatus that provides six degrees of freedom of motion precise to within microns of motion. Precision linear stages along with precision linear motors, encoders, and controls provide a robotics system. The motors can be remotized by incorporating a set of bellows on the motors and can be connected through a computer controller that will allow one to be a master and the other one to be a slave. Position information from the master can be used to control the slave. Forces of interaction of the slave with its environment can be reflected back to the motor control of the master to provide a sense of force sensed by the slave. Forces import onto the master by the operator can be fed back into the control of the slave to reduce the forces required to move it.

  1. Master-slave micromanipulator apparatus

    DOE Patents [OSTI]

    Morimoto, Alan K.; Kozlowski, David M.; Charles, Steven T.; Spalding, James A.

    1999-01-01

    An apparatus based on precision X-Y stages that are stacked. Attached to arms projecting from each X-Y stage are a set of two axis gimbals. Attached to the gimbals is a rod, which provides motion along the axis of the rod and rotation around its axis. A dual-planar apparatus that provides six degrees of freedom of motion precise to within microns of motion. Precision linear stages along with precision linear motors, encoders, and controls provide a robotics system. The motors can be positioned in a remote location by incorporating a set of bellows on the motors and can be connected through a computer controller that will allow one to be a master and the other one to be a slave. Position information from the master can be used to control the slave. Forces of interaction of the slave with its environment can be reflected back to the motor control of the master to provide a sense of force sensed by the slave. Forces import onto the master by the operator can be fed back into the control of the slave to reduce the forces required to move it.

  2. Master-slave micromanipulator apparatus

    DOE Patents [OSTI]

    Morimoto, A.K.; Kozlowski, D.M.; Charles, S.T.; Spalding, J.A.

    1999-08-31

    An apparatus is disclosed based on precision X-Y stages that are stacked. Attached to arms projecting from each X-Y stage are a set of two axis gimbals. Attached to the gimbals is a rod, which provides motion along the axis of the rod and rotation around its axis. A dual-planar apparatus that provides six degrees of freedom of motion precise to within microns of motion. Precision linear stages along with precision linear motors, encoders, and controls provide a robotics system. The motors can be positioned in a remote location by incorporating a set of bellows on the motors and can be connected through a computer controller that will allow one to be a master and the other one to be a slave. Position information from the master can be used to control the slave. Forces of interaction of the slave with its environment can be reflected back to the motor control of the master to provide a sense of force sensed by the slave. Forces import onto the master by the operator can be fed back into the control of the slave to reduce the forces required to move it. 12 figs.

  3. Master's Fellowship Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Master's Fellowship Program (MFP): The Master's Fellowship Program (MFP) provides exceptional minority bachelor's-level candidates with the opportunity to pursue a fully funded Masters of Science degree. The MFP is a minority based program for U.S. under-represented groups in an effort to help enhance the diversity of Sandia's technical workforce. Successful applicants will become regular full-time Sandia employees and join multidisciplinary teams that are advancing the frontiers of science and

  4. Critical Skills Master's Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skills Master's Program (CSMP): The Critical Skills Master's Program (CSMP) provides exceptional bachelor's-level candidates with the opportunity to pursue a fully funded Master's of Science degree. Successful applicants will become regular full-time Sandia employees and join multidisciplinary teams that are advancing the frontiers of science and technology to solve the world's greatest challenges. Program Requirements: * Apply to a minimum of 3 nationally accredited universities. * Successfully

  5. EM SSAB ITR Landfill Assessment Project Lessons Learned Presentation - July 2009

    Office of Environmental Management (EM)

    May 7, 2009 EM SSAB Conference Calls - May 7, 2009 Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program, Chairs' Meeting, and Around the Complex updates and Closing Remarks. EM SSAB Conference Call - May 7, 2009 (67.38 KB) More Documents & Publications EM SSAB Conference Calls - July 9, 2009 EM SSAB Conference Calls - July 26, 2007 EM SSAB

  6. 2010-03 "Sufficient Funding of LANL EM Projects and the Consent Order" |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3 "Sufficient Funding of LANL EM Projects and the Consent Order" 2010-03 "Sufficient Funding of LANL EM Projects and the Consent Order" Additional funding will demonstrate the intent of the Headquarters/DOE to live up to its agreement made in the 2005 Order on Consent. It also should mitigate the need for NMED to fine LANL for not meeting specific deadlines, thus using mission critical funding in ways that will meet the schedule and saving the

  7. Acronym master list

    SciTech Connect (OSTI)

    1995-06-01

    This document is a master list of acronyms and other abbreviations that are used by or could be useful to, the personnel at Los Alamos National Laboratory. Many specialized and well-known abbreviations are not included in this list.

  8. Mastering the Metabolic Mix

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mastering the Metabolic Mix 1663 Los Alamos science and technology magazine Latest Issue:July 2016 past issues All Issues » submit Mastering the Metabolic Mix Through the discovery of natural tricks and the invention of new tactics, scientists are harnessing the power of RNA to manipulate gene expression in bacteria. March 8, 2016 Cliff Unkefer, Karissa Sanbonmatsu, and Scott Hennelly Los Alamos scientists Cliff Unkefer, Karissa Sanbonmatsu, and Scott Hennelly lead a larger team that is

  9. ELECTRONIC MASTER SLAVE MANIPULATOR

    DOE Patents [OSTI]

    Goertz, R.C.; Thompson, Wm.M.; Olsen, R.A.

    1958-08-01

    A remote control manipulator is described in which the master and slave arms are electrically connected to produce the desired motions. A response signal is provided in the master unit in order that the operator may sense a feel of the object and may not thereby exert such pressures that would ordinarily damage delicate objects. This apparatus will permit the manipulation of objects at a great distance, that may be viewed over a closed TV circuit, thereby permitting a remote operator to carry out operations in an extremely dangerous area with complete safety.

  10. MotorMaster+ Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE)

    Fact sheet describing how industrial plants can improve their motor system performance using AMO's MotorMaster+ software tool.

  11. MotorMaster+

    Broader source: Energy.gov [DOE]

    MotorMaster+ is a free online National Electrical Manufacturers Association (NEMA) Premium® efficiency motor selection and management tool that supports motor and motor systems planning by identifying the most efficient action for a given repair or motor purchase decision. The tool includes a catalog of more than 20,000 low-voltage induction motors, and features motor inventory management tools, maintenance log tracking, efficiency analysis, savings evaluation, energy accounting, and environmental reporting capabilities.

  12. MotorMaster+ Tool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MotorMaster+ Tool MotorMaster+ Tool This presentation discusses industrial motor systems and introduces the MotorMaster+ Tool Suite. MotorMaster+ Tool Presentation (March 19, 2009) ...

  13. Project Management Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance ...

  14. EM Capital and Major Operating Project Standard Review Plan Edition Two

    Broader source: Energy.gov [DOE]

    This memorandum introduces the Second Edition of the Capital and Major Operations Projects Standard Review Plan (SRP).

  15. TWRS privatization phase 1 master site plan

    SciTech Connect (OSTI)

    Parazin, R.J.

    1996-09-30

    The DOE-RL is pursuing a new business strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called `privatization` and includes design, permitting, construction, operation and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project consists of several sub-projects which will provide key services needed to support the privatization mission. This master site plan presently describes all pertinent aspects of the site and identifies all planned provisions for site development, utilities and other site services. It is a baseline document which will be revised as privatization proceeds through design, construction and start-up.

  16. One of EM's Last Recovery Act Projects at Oak Ridge Improves...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    arriving at a safer, cleaner campus to conduct their advanced research." The project's main objective was to deactivate a ventilation branch connected to ORNL's central gaseous...

  17. EM Leaders Earn National Defense Degrees

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Two EM employees were recently awarded Master of Science degrees from the National Defense University (NDU) as part of a DOE-sponsored professional development program.

  18. Headquarters Facilities Master Security Plan- Acronyms

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Acronyms A list of the acronyms contained in the 2016 Headquarters Facilities Master Security Plan (HQFMSP).

  19. FY-2014 EM-EFCOG QA Project Plan_Final.pdf

    Office of Environmental Management (EM)

    Metrics and Targets | Department of Energy 3 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2013 Overall Contract and Project Management Improvement Performance Metrics and Targets Overall Contract and Project Management Performance Metrics and Targets for FY 2013, first quarter through fourth quarter. FY 2013 1st Quarter Metrics (36.93 KB) FY 2013 2nd Quarter Metrics (36.62 KB) FY 2013 3rd Quarter Metrics (37.04 KB) FY 2013 4th Quarter Metrics (37.15

  20. Master Safeguards and Security Agreements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-02-03

    To establish the Department of Energy policy, requirements, responsibilities, and authorities for the development and implementation of Master Safeguards and Security Agreements (MSSA's). Does not cancel another directive. Canceled by DOE O 5630.13A

  1. Steven T. McMaster

    Broader source: Energy.gov [DOE]

    Mr. McMaster joined the DOE Office of Technology Transitions in March 2015. Prior to then he had been the director of Technology Deployment at the Idaho National Laboratory (INL) since 2010. At INL...

  2. Dual arm master controller concept

    SciTech Connect (OSTI)

    Kuban, D.P.; Perkins, G.S.

    1984-01-01

    The Advanced Servomanipulator (ASM) slave was designed with an anthropomorphic stance, gear/torque tube power drives, and modular construction. These features resulted in increased inertia, friction, and backlash relative to tape-driven manipulators. Studies were performed which addressed the human factors design and performance trade-offs associated with the corresponding master controller best suited for the ASM. The results of these studies, as well as the conceptual design of the dual arm master controller, are presented. 6 references, 3 figures.

  3. Report: Removal of EM Projects from the GAO High Risk List

    Office of Environmental Management (EM)

    Report: IG-0449 Report: IG-0449 July 19, 1999 The Office of Defense Programs Robotics and Intelligent Machines Projects Robotics and Intelligent Machines (RIM) are systems composed of machines, sensors, computers, and software capable of executing various tasks with minimal human intervention. They have wide range application for solving many operational challenges including nuclear waste cleanup and weapons manufacturing and dismantlement. RIM accelerates cleanup and reduces the amount of

  4. EM International. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    It is the intent of EM International to describe the Office of Environmental Restoration and Waste Management`s (EM`s) various roles and responsibilities within the international community. Cooperative agreements and programs, descriptions of projects and technologies, and synopses of visits to international sites are all highlighted in this semiannual journal. Focus on EM programs in this issue is on international collaboration in vitrification projects. Technology highlights covers: in situ sealing for contaminated sites; and remote sensors for toxic pollutants. Section on profiles of countries includes: Arctic contamination by the former Soviet Union, and EM activities with Germany--cooperative arrangements.

  5. EM Leaders Visit Employees at Moab Site

    Broader source: Energy.gov [DOE]

    EM Principal Deputy Assistant Secretary Tracy Mustin and EM Consolidated Business Center Director Jack Craig visited the Moab Project sites in Utah on March 12.

  6. EM Quality Assurance Policy, Revision 0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It is EM policy that all EM projects will have a consistent quality assurance approach while allowing for grading based ... Quality Assurance Implementation Plan demonstrating how ...

  7. EM News Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Principal Deputy Assistant Secretary Tracy Mustin and EM Consolidated Business Center Director Jack Craig visited the Moab Project sites in Utah on March 12. March 12, 2013...

  8. Implementation plan for HANDI 2000 TWRS master equipment list

    SciTech Connect (OSTI)

    BENNION, S.I.

    1999-03-25

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  9. Chapter 19: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures: September 2011 … December 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures Created as part of subcontract with period of performance September 2011 - December 2014 Jeff Romberger SBW Consulting, Inc. Bellevue, Washington NREL Technical Monitor: Charles Kurnik Subcontract Report NREL/SR-7A40-63167 November 2014 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable

  10. Microsoft PowerPoint - EM SSAB Chairs Webinar - (2) Huizenga EM Program Update for SSAB Chairs.042513

    Office of Environmental Management (EM)

    Chairs' Webinar www.energy.gov/EM 1 David Huizenga Senior Advisor for the Office of Environmental Management April 25, 2013 Click to edit Master title style Environmental Cleanup-a Key DOE Strategic Goal EM's mission is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. EM supports DOE Strategic Goal #3: Click to edit Master subtitle style www.energy.gov/EM 2 EM supports DOE

  11. EM-20 ISD Report

    Office of Environmental Management (EM)

    Project Experience & Lessons Learned for In Situ Decommissioning Prepared By U.S. Department of Energy Office of Environmental Management Office of D&D and FE, EM-13 This page is deliberately blank. DOE EM Project Experience for In Situ Decommissioning i Contents Acronyms .................................................................................................................................................... vii 1. Introduction

  12. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review

    Broader source: Energy.gov [DOE]

    This EVMS Training Snippet, sponsored by the Office of Project Management (PM) covers how to review an Integrated Master Schedule (IMS) and highlights common areas of non-compliance with ANSI/EIA...

  13. DOE Navigant Master Presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Navigant Master Presentation DOE Navigant Master Presentation DOE Navigant Master Presentation.pdf (16.47 MB) More Documents & Publications Model Repair Specifications for Low Voltage Induction Motors Improving Motor and Drive System Performance - A Sourcebook for Industry Motor Energy Savings Potential Report

  14. EM Quaility Assurance Program (EM-QA-001 Revision 1)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM-QA-001 Rev. 1 Issue Date 06/11/12 2 Project lifecycles including design, engineering, construction, commissioning, operation, and post-operation, e.g., surveillance and maintenance, deactivation, decommissioning, and environmental restoration. 3.0 APPLICABILITY The requirements contained within this document apply to EM HQ, EM Field/Project Offices, and EM contractors (including flow down to subcontractors, vendors, and suppliers) as applicable to the work being performed by each entity. Each

  15. Headquarters Facilities Master Security Plan - Chapter 12, Special...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Headquarters Facilities Master Security Plan - Chapter 11, Incidents of Security Concern Headquarters Facilities Master Security Plan - Acronyms ...

  16. Headquarters Facilities Master Security Plan - Chapter 9, Technical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9, Technical Surveillance Countermeasures Headquarters Facilities Master Security Plan - Chapter 9, Technical Surveillance Countermeasures 2016 Headquarters Facilities Master ...

  17. Headquarters Facilities Master Security Plan - Chapter 8, Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Headquarters Facilities Master Security Plan - Chapter 9, Technical Surveillance Countermeasures Headquarters Facilities Master Security Plan - Chapter 15, ...

  18. Shiprock Archived Soil & Groundwater Master Reports | Department of Energy

    Office of Environmental Management (EM)

    Shiprock Archived Soil & Groundwater Master Reports Shiprock Archived Soil & Groundwater Master Reports Shiprock Archived Soil & Groundwater Master Reports Shiprock - Shiprock (19.31 KB) More Documents & Publications Slick Rock Archived Soil & Groundwater Master Reports Tuba City Archived Soil & Groundwater Master Reports Spook Archived Soil & Groundwater Master Reports

  19. Spook Archived Soil & Groundwater Master Reports | Department of Energy

    Office of Environmental Management (EM)

    Spook Archived Soil & Groundwater Master Reports Spook Archived Soil & Groundwater Master Reports Spook Archived Soil & Groundwater Master Reports Spook - Spook (17.91 KB) More Documents & Publications Tuba City Archived Soil & Groundwater Master Reports Slick Rock Archived Soil & Groundwater Master Reports Weldon Spring Site Archived Soil & Groundwater Master Reports

  20. MotorMaster+ Software Tool Brochure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Software Tool Brochure MotorMaster+ Software Tool Brochure This brochure provides information on AMO's MotorMaster+ software tool, including how it works, next steps, and how to access it. MotorMaster+ Brochure (2.48 MB) More Documents & Publications MotorMaster+ International Fact Sheet MotorMaster+ Fact Sheet MotorMaster+ Tool

  1. MASTER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /)Bcc{-'^y^^ REPORT ON CONTRACT NO. A T ( l l - l ) - 1 0 1 1/ITH THE U . S . ATOMC ENERGY COH'ilSSION ENTnLED "RESEARCH ON THE NATURAL ABUNDANCE OF DEUTERIUl-i AND OTHER ISOTOPES IN NATURItl" by Harold 0. Urey. This contract came to an ehd on September 30, 19$8. The reports that have been submitted from time to time have given a review of the progress from year to year, and, so far as this final report is concerned, nothing new can really be added except to say that a very great deal

  2. MASTER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    panada Limited METHODS FOR NEUTRON SPECTROMETRY CRNP-947 by B.N. BROCKHOUSE C h a lk River, O n tario January 9, 1961 AECU183 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. ATOMIC ENERGY OF CANADA LIMITED Research and Development METHODS FOR NEUTRON SPECTROMETRY CRN? 947 by B.N, Brockhouse This paper was presented as Paper No, IS/lS at the Symposium on Inelastic Scattering in Solids and Liquids,

  3. MASTER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BNL 23182 'TEFIPERA'TURE DEPENDENCE OF PI-IONONS IN PYROLlTlC GRAPI4ITE * B .N. Brockl~ouse and G. Shirane Brookhaven National Laboratory t n D i spersj on curves f o r l o n g i t u d i n a l s v e r s e phonons propagating along and near t h e c - a x i s i n p y r o l i t i c g r a p h i t e a t temperatures between 4 O K and l500*C have been measured by neutron spectroscopy. The observed frequencies decrease markedly with i n c r e a s i n g teinperature (except f o r t h e t r a n s v e r s

  4. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  5. Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM CAPITAL PORTFOLIO EM is tasked with solving the large scale, technically challenging ... to more effectively manage the cost and schedule performance of capital asset projects. ...

  6. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  7. IACT-funded Master and Doctoral Theses

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Presentations Jobs at IACT Energy Frontier Research Centers at Argonne Strategic Alliances Research Facilities & Tools IACT-funded Master and Doctoral Theses 2013 2013...

  8. MotorMaster+ International Fact Sheet

    Broader source: Energy.gov [DOE]

    This fact sheet describes how industrial plants can improve their motor system performance for a broader range of motors with AMO's MotorMaster+ International software tool.

  9. EM News Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of workers who produced plutonium for the Manhattan Project, World War II, and Cold War. September 4, 2014 EM Acquisition and Project Management Deputy Assistant Secretary...

  10. Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

    2010-01-01

    unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

  11. Project Definition Rating Index (PDRI) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Definition Rating Index (PDRI) Project Definition Rating Index (PDRI) The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for EM's projects. EM-PDRI Team members represent a number of EM sites, and have already used this project planning tool successfully. The EM-PDRI examines a wide range of project factors related to cost, scope, and schedule, and

  12. DOE Recognizes EM Richland Operations Office Employees for Excellence...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... construction with Waste Treatment and Immobilization Project Assistant Manager Bill Hamel, left; EM Acting Assistant Secretary Mark Whitney, second from left; and EM Waste ...

  13. 2012 Annual Planning Summary for EM Energy Technology Engineering...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Energy Technology Engineering Center 2012 Annual Planning Summary for EM Energy Technology Engineering Center The ongoing and projected Environmental Assessments and ...

  14. MotorMaster+ User Manual | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    User Manual MotorMaster+ User Manual This user manual is designed to help users understand the MotorMaster+ software tool. MotorMaster+ User Manual (1.92 MB) More Documents & Publications MotorMaster+ International Fact Sheet Replacing an Oversized and Underloaded Electric Motor MotorMaster+ Fact Sheet

  15. Master equipment list -- Phase 1. Revision 1

    SciTech Connect (OSTI)

    Jech, J.B.

    1995-04-28

    The purpose of this document is to define the system requirements for the Master Equipment List (MEL) Phase 1 project. The intended audience for this document includes Data Automation Engineering (DAE), Configuration Management Improvement and Control Engineering (CMI and CE), Data Administration Council (DAC), and Tank Waste Remedial System (TWRS) personnel. The intent of Phase 1 is to develop a user-friendly system to support the immediate needs of the TWRS labeling program. Phase 1 will provide CMI and CE the ability to administrate, distribute, and maintain key information generated by the labeling program. CMI and CE is assigning new Equipment Identification Numbers (EINs) to selected equipment in Tank Farms per the TWRS Data Standard ``Tank Farm Equipment Identification Number``. The MEL Phase 1 system will be a multi-user system available through the HLAN network. It will provide basic functions such as view, query, and report, edit, data entry, password access control, administration and change control. The scope of Phase 1 data will encompass all Tank Farm Equipment identified by the labeling program. The data will consist of fields from the labeling program`s working database, relational key references and pointers, safety class information, and field verification data.

  16. Headquarters Facilities Master Security Plan - Chapter 5, Classified...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter ...

  17. South Valley Archived Soil & Groundwater Master Reports | Department...

    Broader source: Energy.gov (indexed) [DOE]

    South Valley Archived Soil & Groundwater Master Reports South Valley - South Valley Plume (16.5 KB) More Documents & Publications Slick Rock Archived Soil & Groundwater Master ...

  18. Headquarters Facilities Master Security Plan - Chapter 5, Classified...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter...

  19. Headquarters Facilities Master Security Plan - Chapter 16, Equivalenci...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6, Equivalencies and Exemptions Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions June 2015 2015 Headquarters Facilities Master Security Plan...

  20. Headquarters Facilities Master Security Plan - Chapter 16, Equivalenci...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions June...

  1. Headquarters Facilities Master Security Plan- Table of Contents

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Table of Contents Table of Contents for the 2016 Headquarters Facilities Master Security Plan (HQFMSP).

  2. Headquarters Facilities Master Security Plan - Chapter 14, Cyber...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, Cyber Security Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security 2016 Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security HQ cyber ...

  3. Headquarters Facilities Master Security Plan - Chapter 7, Surveys...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7, Surveys and Reviews Headquarters Facilities Master Security Plan - Chapter 7, Surveys and Reviews 2016 Headquarters Facilities Master Security Plan - Chapter 7, Surveys and ...

  4. Headquarters Facilities Master Security Plan - Chapter 15, Outprocessi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5, Outprocessing Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing 2016 Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing This chapter ...

  5. Second Line of Defense Master Spares Catalog

    SciTech Connect (OSTI)

    Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

    2012-11-20

    This catalog is intended to be a comprehensive listing of repair parts, components, kits, and consumable items used on the equipment deployed at SLD sites worldwide. The catalog covers detection, CAS, network, ancillary equipment, and tools. The catalog is backed by a Master Parts Database which is used to generate the standard report views of the catalog. The master parts database is a relational database containing a record for every part in the master parts catalog along with supporting tables for normalizing fields in the records. The database also includes supporting queries, database maintenance forms, and reports.

  6. EM Hosts Business Opportunity Forum | Department of Energy

    Office of Environmental Management (EM)

    December 11, 2014 - 3:00pm Addthis EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash speaks to participants of EM's Business Opportunity Forum. EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash speaks to participants of EM's Business Opportunity Forum. WASHINGTON, D.C. - More than 50 people gathered at a public forum today on EM's federal procurement process and upcoming business opportunities in the legacy nuclear cleanup program. EM

  7. EM Hosts Business Opportunity Forum | Department of Energy

    Office of Environmental Management (EM)

    March 4, 2015 - 4:00pm Addthis EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash addresses participants in EM's Business Opportunity Forum. EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash addresses participants in EM's Business Opportunity Forum. Forum participant Jim Fannon asks Surash a question. Forum participant Jim Fannon asks Surash a question. EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash addresses

  8. Environmental surveillance master sampling schedule

    SciTech Connect (OSTI)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  9. Environmental surveillance master sampling schedule

    SciTech Connect (OSTI)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  10. Dual arm master controller for a bilateral servo-manipulator

    DOE Patents [OSTI]

    Kuban, Daniel P.; Perkins, Gerald S.

    1989-01-01

    A master controller for a mechanically dissimilar bilateral slave servo-manipulator is disclosed. The master controller includes a plurality of drive trains comprising a plurality of sheave arrangements and cables for controlling upper and lower degrees of master movement. The cables and sheaves of the master controller are arranged to effect kinematic duplication of the slave servo-manipulator, despite mechanical differences therebetween. A method for kinematically matching a master controller to a slave servo-manipulator is also disclosed.

  11. Environmental surveillance master sampling schedule

    SciTech Connect (OSTI)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  12. 2012 Annual Planning Summary for EM Energy Technology Engineering Center

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within EM Energy Technology Engineering Center.

  13. 2014 Annual Planning Summary for the EM Consolidated Business Center

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the EM Consolidated Business Center.

  14. Professional Association Honors EM Employee with Technical Excellence Award

    Office of Energy Efficiency and Renewable Energy (EERE)

    An association with expertise in project cost and schedule management honored an EM employee with its Technical Excellence Award.

  15. (SSS)Project Dashboard 2015-12-21 1000.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment 1 EM Bechtel National Inc. 01-D-416 Waste Treatment and ...

  16. EM SSAB Chairs Letters.081408.pdf

    Office of Environmental Management (EM)

    SW Washington, DC 20585 Dear Mr. Rispoli: SUBJECT: Recommendation that Quarterly Project Reviews (QPR) be Shared with the Environmental Management (EM) Site Specific Advisory...

  17. Microsoft PowerPoint - Cochran - EM-10 Presentation - EMAB Meeting...

    Office of Environmental Management (EM)

    project management principles for DOE * DOE senior leadership commitment www.em.doe.gov - Continuous improvement of project management - Removing all DOE organizations from the...

  18. EM Taps Talent of Minority Serving Institutions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Taps Talent of Minority Serving Institutions EM Taps Talent of Minority Serving Institutions December 23, 2014 - 12:00pm Addthis A student explains an EM-supported applied research project to Mark Gilbertson, EM Deputy Assistant Secretary for Site Restoration, left, at a Historically Black Colleges and Universities workshop held at Savannah River National Laboratory in April 2014. A student explains an EM-supported applied research project to Mark Gilbertson, EM Deputy Assistant Secretary for

  19. EM program implements feedback from community | Department of Energy

    Energy Savers [EERE]

    Taps Talent of Minority Serving Institutions EM Taps Talent of Minority Serving Institutions December 23, 2014 - 12:00pm Addthis A student explains an EM-supported applied research project to Mark Gilbertson, EM Deputy Assistant Secretary for Site Restoration, left, at a Historically Black Colleges and Universities workshop held at Savannah River National Laboratory in April 2014. A student explains an EM-supported applied research project to Mark Gilbertson, EM Deputy Assistant Secretary for

  20. Latin square three dimensional gage master

    DOE Patents [OSTI]

    Jones, Lynn L.

    1982-01-01

    A gage master for coordinate measuring machines has an nxn array of objects distributed in the Z coordinate utilizing the concept of a Latin square experimental design. Using analysis of variance techniques, the invention may be used to identify sources of error in machine geometry and quantify machine accuracy.

  1. EM-PDRI Team Concurrence

    Office of Environmental Management (EM)

    Revision 1, January, 2001, reflects the requirements in DOE Order 413.3 and the Draft Manual for Program and Project Management, October, 2000. As such, the EM*PDRI provides a...

  2. Microsoft Word - Updated By-Laws for EM QA Corporate Board from...

    Office of Environmental Management (EM)

    2 application of project QA lessons learned throughout the EM complex; and Support continuous improvement of the overall EM mission performance (e.g., capital and major...

  3. Energy Department to Fund Master's and Doctoral Training in Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fund Master's and Doctoral Training in Power Electronics Energy Department to Fund Master's and Doctoral Training in Power Electronics July 30, 2015 - 12:05pm Addthis As part of ...

  4. About the Oil and Gas Field Code Master List

    U.S. Energy Information Administration (EIA) Indexed Site

    About the Oil and Gas Field Code Master List 1 April 30, 2012 About the Oil and Gas Field Code Master List The U.S. Energy Information Administration's (EIA) Oil and Gas Field Code ...

  5. Fernald Environmental Management Project Archived Soil & Groundwater Master

    Office of Environmental Management (EM)

    Federal Register Notice, CBDPP Final Rule Federal Register Notice, CBDPP Final Rule December 8, 1999 Federal Register Notice, Final rule for 10 CFR part 850, CBDPP The Department of Energy (DOE) published a final rule to establish a chronic beryllium disease prevention program (CBDPP) to reduce the number of workers currently exposed to beryllium in the course of their work at DOE facilities managed by DOE or its contractors, minimize the levels of, and potential for, exposure to beryllium, and

  6. Headquarters Facilities Master Security Plan- Chapter 9, Technical Surveillance Countermeasures

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 9, Technical Surveillance Countermeasures Describes the DOE Headquarters Technical Security Countermeasures (TSCM) Program.

  7. Headquarters Facilities Master Security Plan- Chapter 10, Security Awareness Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 10, Security Awareness Program Describes the DOE Headquarters Security Awareness Program

  8. Office of Environmental Management (EM) Organization Chart | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart (304.47 KB) More Documents & Publications Office of Environmental Management (EM) Organization Chart Portsmouth Paducah Project Office (PPPO) Organization Keynote Address DOE's Hydrogen and Fuel Cell Technologies Manufacturing Sub-Program

  9. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    United States Department of Energy Contract Management by the Department of Energy's ... (EM) acquisitions and of contract and project management reforms that EM is implementing. ...

  10. GAO Report Reflects Success Story for EM Sites

    Broader source: Energy.gov [DOE]

    In a report released earlier this year, the U.S. Government Accountability Office (GAO) said it recognized progress on EM projects of $750 million or less and was shifting the focus of EM's high-risk designation more to major contracts and projects greater than $750 million. This progress is evident at several EM sites.

  11. Microsoft PowerPoint - EM SSAB Chairs Webinar - (2) Huizenga...

    Office of Environmental Management (EM)

    Carlsbad 208M Portsmouth 152M West Valley Demonstration Project 66M Nevada 62M Other 56M Moab 36M SPRU 24M Total Request 5.622B Click to edit Master subtitle style ...

  12. EM Historical Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Historical Timeline EM Historical Timeline

  13. Contract/Project Management

    Office of Environmental Management (EM)

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects

  14. New hydrocracker complex: The master plan study report. Volume 3. Export trade information

    SciTech Connect (OSTI)

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Kirishi, Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 3 of a three volume report and is divided into the following sections: (5) Marketing Plan; (6) Project Costs and Economics; (7) Project Execution. Appendix C follows.

  15. 2015-09-25 EM Contractor List.xls

    Office of Environmental Management (EM)

    Project INL Idaho National Laboratory CD0 TBD TBD EM 001021 OR-0041.C2 Outfall 200 Mercury Treatment Facility Oak Ridge Oak Ridge CD0 UCOR URS CH2M Hill Oak Ridge, LLC EM...

  16. ZMK Ems Solar GmbH | Open Energy Information

    Open Energy Info (EERE)

    ZMK Ems Solar GmbH Jump to: navigation, search Name: ZMK Ems-Solar GmbH Place: Haren, Germany Zip: 49733 Product: German project developer with 25MW of installed capacity....

  17. EM to Hold Procurement Workshop Sept. 16 | Department of Energy

    Energy Savers [EERE]

    to Hold Procurement Workshop Sept. 16 EM to Hold Procurement Workshop Sept. 16 August 25, 2016 - 12:00pm Addthis WASHINGTON, D.C. - EM is scheduled to hold a procurement workshop Sept. 16 at DOE headquarters in Washington, D.C. to help solicit industry feedback as EM prepares for upcoming acquisitions. Led by EM Deputy Assistant Secretary for Acquisition and Project Management and EM Consolidated Business Center Director Ralph Holland, the workshop will include topics such as lessons learned

  18. Microsoft PowerPoint - 1415 - Surash, EM perspective

    Office of Environmental Management (EM)

    ... 2,108 M APPROVED COST 2,456 M ACTUALFORECAST COST 1,660 M ACTUAL COST 427 M SAVINGS ... Recognition for EM Projects Project Management Institute (PMI) Project of the Year * 2015 ...

  19. Contract/Project Management

    Office of Environmental Management (EM)

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete

  20. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  1. Contract/Project Management

    Office of Environmental Management (EM)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  2. Contract/Project Management

    Office of Environmental Management (EM)

    4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125%

  3. Requirements for being an IREC Certified Instructor and Master Trainer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IREC Candidate Handbook v.11 June 2014 11 IREC Certified Instructor and Master Trainer IREC certification as Instructor or Master Trainer indicates a breadth and depth of experience that the individual brings with them wherever they teach. Affiliation with an IREC Accredited Training Provider is not required in order to apply for or maintain certification. To become certified as an Instructor or Master Trainer, a candidate must demonstrate through the application and assessment process that s/he

  4. Weldon Spring Site Archived Soil & Groundwater Master Reports | Department

    Office of Environmental Management (EM)

    of Energy Weldon Spring Site Archived Soil & Groundwater Master Reports Weldon Spring Site Archived Soil & Groundwater Master Reports Weldon Spring Site Archived Soil & Groundwater Master Reports Weldon Spring Site - Chemical Plant East Plume (17.9 KB) Weldon Spring Site - Chemical Plant Quarry (17.53 KB) Weldon Spring Site - Chemical Plant VOC (16.06 KB) Weldon Spring Site - Chemical Plant West Plume (18.61 KB) More Documents & Publications South Valley Archived Soil &

  5. Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protection and Control | Department of Energy Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control 2016 Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control This, the largest chapter in the HQFMSP, describes the procedures required to properly protect classified matter from the day it is created to the

  6. Headquarters Facilities Master Security Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    » Headquarters Facilities Master Security Plan Headquarters Facilities Master Security Plan Welcome to the 2016 version of the Headquarters Facilities Master Security Plan (HQFMSP). The purpose of the HQFMSP is to inform employees, contractors, and visitors of the security procedures in place at Department of Energy (DOE) Headquarters (HQ) facilities in the Washington, DC area. The HQFMSP does not establish new security requirements; security requirements are established by various Federal laws

  7. Headquarters Facilities Master Security Plan - Chapter 2, Limited...

    Broader source: Energy.gov (indexed) [DOE]

    and termination of areas within HQ buildings where classified activities take place. ... Master Security Plan - Chapter 5, Classified Matter Protection and Control ...

  8. Headquarters Facilities Master Security Plan- Chapter 16, Equivalencies and Exemptions

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions Describes DOE Headquarters procedures for requesting Equivalencies and Exemptions to DOE security directives.

  9. Improve Motor System Performance with MotorMaster+

    SciTech Connect (OSTI)

    2010-08-01

    Fact sheet describes how industrial plants can improve their motor system performance using DOE-AMO's MotorMaster+ software tool.

  10. Headquarters Facilities Master Security Plan- Chapter 6, Foreign Interaction

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 6, Foreign Interaction Describes DOE Headquarters procedures for approving foreign national visitors and assignees and travel to foreign countries.

  11. Headquarters Facilities Master Security Plan- Chapter 12, Special Access Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 12, Special Access Programs Describes DOE Headquarters procedures for reporting, investigating, and correcting Incidents of Security Concern.

  12. Headquarters Facilities Master Security Plan- Chapter 7, Surveys and Reviews

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 7, Surveys and Reviews Describes DOE Headquarters procedures for conducting various types of security reviews and assessments and correcting findings.

  13. Headquarters Facilities Master Security Plan- Chapter 3, Personnel Security

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 3, Personnel Security Describes DOE Headquarters Personnel Security procedures for acquiring, maintaining, and passing security clearances.

  14. Headquarters Facilities Master Security Plan- Chapter 15, Outprocessing

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing Describes DOE Headquarters procedures for completing required security actions by departing employees and contractors.

  15. Headquarters Facilities Master Security Plan- Chapter 13, Controlled Unclassified Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 13, Controlled Unclassified Information Describes DOE Headquarters procedures for protecting Controlled Unclassified Information (CUI).

  16. Uniform Methods Project Related Links | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Related Links Uniform Methods Project Related Links The websites and publications listed below provide supporting information for the Uniform Methods Project and for evaluation, measurement, and verification (EM&V) of energy efficiency programs. Glossaries of EM&V Terms Federal EM&V Resources International Resources Related Standards Glossaries of EM&V Terms The following glossaries provide definitions of technical language and EM&V terms. Appendix A: Glossary of

  17. New hydrocracker complex: The master plan study report, volume 2. Export trade information

    SciTech Connect (OSTI)

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 2 of a three volume report and it is divided into the following sections: (2) Background and Introduction; (3) Project Profile; (4) Safety. Appendixes A and B follow.

  18. EMS Description

    Broader source: Energy.gov [DOE]

    This document describes the joint U.S. Department of Energy (DOE) Office of Legacy Management (LM) and the Legacy Management Support (LMS) Contractor Team Environmental Management System (EMS).

  19. Master environmental plan for Fort Devens, Massachusetts

    SciTech Connect (OSTI)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. . Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  20. 2011 Annual Planning Summary for Environmental Management (EM)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Environmental Management (EM).

  1. 2011 Annual Planning Summary for EM Consolidated Business Center (EMCBC)

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the EM Consolidated Business Center (EMCBC) (See Environmental Management APS).

  2. Microsoft Word - MR_Contingency_Protocol_EM_FINAL.docx

    Energy Savers [EERE]

    41210 1 EM Protocol for Application of Contingency and Management Reserve for the Acquisition of Capital Asset Projects This document provides guidance for the development and...

  3. EM international activities. February 1997 highlights

    SciTech Connect (OSTI)

    1997-02-01

    EM International Highlights is a brief summary of on-going international projects within the Department of Energy`s Office of Environmental Management (EM). This document contains sections on: Global Issues, activities in Western Europe, activities in central and Eastern Europe, activities in Russia, activities in Asia and the Pacific Rim, activities in South America, activities in North America, and International Organizations.

  4. Workers Access Cell in First Human Entry in 20 Years at EM's...

    Office of Environmental Management (EM)

    Cell at EM's West Valley Demonstration Project (WVDP), where past operations ... "The West Valley Demonstration Project was the only operational commercial used fuel ...

  5. Summary - Uranium233 Downblending and Disposition Project

    Office of Environmental Management (EM)

    The projec blended materia or the Nevada cted to coincid ack-end" of the ng observation ... Oak RidgeOR 233 Uranium Do Project September 20 Departmen anium D E-EM Did This em and ...

  6. Report: Acquisition, Project Management, and Quality Assurance

    Office of Environmental Management (EM)

    ... into a performance baseline with scope, costs, and schedules based on an immature design ... EM's project reporting, analyses, and forecasting. o EM plans to move to a web-based ...

  7. Coho Salmon Master Plan, Clearwater River Basin.

    SciTech Connect (OSTI)

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these

  8. DOE-STD-1104-2014 Master Acronym List | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Master Acronym List DOE-STD-1104-2014 Master Acronym List February 4, 2015 DOE-STD-1104 Master Acronyms List. This document provides a Master Acronyms List of terms used in DOE-STD-1104. DOE-STD-1104-2014 Master Acronym List (38.47 KB) More Documents & Publications DOE-STD-1104-2014 Training Master Acronym List for DOE-STD-3009-2014 Requirements Crosswalk of DOE-STD-1104-2014

  9. SOPP-43, EM-23 Quality Assurance Oversight | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Program Management » Quality Assurance » SOPP-43, EM-23 Quality Assurance Oversight SOPP-43, EM-23 Quality Assurance Oversight Procedure to describe the process that will be utilized by the EM Office of Standards and Quality Assurance to guide its activities related to oversight and audit of the EM Field/site, project, and vendor QA programs. SOPP-43, EM-23 Quality Assurance Oversight (408.14 KB) More Documents & Publications Protocol for EM Review/Field Self-Assessment of

  10. Preliminary Master Logic Diagram for ITER operation

    SciTech Connect (OSTI)

    Cadwallader, L.C.; Taylor, N.P.; Poucet, A.E.

    1998-04-01

    This paper describes the work performed to develop a Master Logic Diagram (MLD) for the operations phase of the International Thermonuclear Experimental Reactor (ITER). The MLD is a probabilistic risk assessment tool used to identify the broad set of potential initiating events that could lead to an offsite radioactive or toxic chemical release from the facility under study. The MLD described here is complementary to the failure modes and effects analyses (FMEAs) that have been performed for ITER`s major plant systems in the engineering evaluation of the facility design. While the FMEAs are a bottom-up or component level approach, the MLD is a top-down or facility level approach to identifying the broad spectrum of potential events. Strengths of the MLD are that it analyzes the entire plant, depicts completeness in the accident initiator process, provides an independent method for identification, and can also identify potential system interactions. MLDs have been used successfully as a hazard analysis tool. This paper describes the process used for the ITER MLD to treat the variety of radiological and toxicological source terms present in the ITER design. One subtree of the nineteen page MLD is shown to illustrate the levels of the diagram.

  11. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS)...

    Energy Savers [EERE]

    A Integrated Master Schedule (IMS) Initial Baseline Review EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review This EVMS Training Snippet, ...

  12. New Idaho Cleanup Project Contractor Unveils Management Team...

    Office of Environmental Management (EM)

    Idaho Cleanup Project Contractor Unveils Management Team New Idaho Cleanup Project Contractor Unveils Management Team April 27, 2016 - 12:35pm Addthis IDAHO FALLS, Idaho - EM's new ...

  13. Headquarters Facilities Master Security Plan- Chapter 1, Physical Security

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 1, Physical Security Describes DOE Headquarters Physical Security procedures related to badges, inspections, access controls, visitor controls, and removal of government property.

  14. Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4, Cyber Security Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security 2016 Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security HQ cyber security activities are managed by the Cyber Support Division (IM-622) within the Office of Chief Information Officer (IM-1). This chapter only covers the requirement for each HQ program element to appoint an Information Systems Security Officer (ISSO) to act as the point of contact between the

  15. Headquarters Facilities Master Security Plan - Chapter 17, Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Officer Program | Department of Energy 7, Headquarters Security Officer Program Headquarters Facilities Master Security Plan - Chapter 17, Headquarters Security Officer Program 2016 Headquarters Facilities Master Security Plan - Chapter 17, Headquarters Security Officer Program This chapter implements HQ Order 472.1, Headquarters Security Officer Program, which requires that all HQ program elements appoint a Federal employee to the position of HSO and a second Federal employee to

  16. Headquarters Facilities Master Security Plan - Chapter 8, Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Program | Department of Energy 8, Operations Security Program Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program 2016 Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program This chapter describes the HQ OPSEC Program and the procedures to be followed by HQ program elements for identifying their Critical Information. This chapter also discusses the appointment of OPSEC representatives, activities of the HQ OPSEC

  17. Sandia employee dubbed a master at locking down NNSA's enterprise |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Sandia employee dubbed a master at locking down NNSA's enterprise Wednesday, August 31, 2016 - 10:43am Steve Highland, a Sandia National Laboratories security expert, is the only Certified Master Safe Technician in New Mexico. NNSA's primary missions include keeping dangerous materials out of the wrong hands while protecting and maintaining the nation's nuclear deterrent. It's no surprise, then, that NNSA's labs and sites employ the best

  18. Oil and gas field code master list, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-16

    This document contains data collected through October 1993 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. Other Federal and State government agencies, as well as industry, use the EIA Oil and Gas Field Code Master List as the standard for field identification. A machine-readable version of the Oil and Gas Field Code Master List is available from the National Technical Information Service.

  19. Mastering Campus Energy and Water Management - Tools for Success

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Providence, RI) | Department of Energy Mastering Campus Energy and Water Management - Tools for Success (Providence, RI) Mastering Campus Energy and Water Management - Tools for Success (Providence, RI) August 8, 2016 9:00AM to 3:00PM EDT INTERMEDIATE LEVEL (201) This highly interactive workshop, which will be held at the Rhode Island Convention Center in Providence, Rhode Island, features technical experts who will engage participants in a campus-planning exercise intended to give them

  20. New hydrocracker complex: The master plan study report. Executive summary. Volume 1. Export trade information

    SciTech Connect (OSTI)

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 1 of a three volume report and it contains the Executive Summary.

  1. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  2. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Separations Process Research Unit by feinberg DesignationofEMFedProjDir-SeparationsProcessResearchUnit-FeinbergEM.pdf -- PDF...

  3. Miscellaneous Archived Soil & Groundwater Master Reports | Department...

    Office of Environmental Management (EM)

    (40.82 KB) Falls City (42.13 KB) Gasbuggy (33.09 KB) Gnome-Coach (35.73 KB) Grand Junction Project Office (38.89 KB) Grand Junction (35.92 KB) Green River (38.54 KB) ...

  4. Participants in Quarterly Public Forum Learn Latest News on Doing Business with EM

    Broader source: Energy.gov [DOE]

    EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash provides an overview of EM to more than 50 people attending the Business Opportunity Forum this month at DOE headquarters in Washington, D.C.

  5. Method of fabricating a 3-dimensional tool master

    DOE Patents [OSTI]

    Bonivert, William D. (Pleasanton, CA); Hachman, John T. (Stockton, CA)

    2002-01-01

    The invention is a method for the fabrication of an imprint tool master. The process begins with a metallic substrate. A layer of photoresist is placed onto the metallic substrate and a image pattern mask is then aligned to the mask. The mask pattern has opaque portions that block exposure light and "open" or transparent portions which transmit exposure light. The photoresist layer is then exposed to light transmitted through the "open" portions of the first image pattern mask and the mask is then removed. A second layer of photoresist then can be placed onto the first photoresist layer and a second image pattern mask may be placed on the second layer of photoresist. The second layer of photoresist is exposed to light, as before, and the second mask removed. The photoresist layers are developed simultaneously to produce a multi-level master mandrel upon which a conductive film is formed. A tool master can now be formed onto the conductive film. An imprint tool is then produced from the tool master. In one embodiment, nickel is electroplated onto the tool master to produce a three-dimensional imprint tool.

  6. Briefing: DOE EM Landfill Workshop & Path Forward | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Landfill Workshop & Path Forward Briefing: DOE EM Landfill Workshop & Path Forward By: Office of Groundwater and Soil Remediation Where: SSAB Teleconference 2 Subject: DOE EM Landfill Workshop & Path Forward DOE EM Landfill Workshop and Path Forward - July 2009 (316.86 KB) More Documents & Publications Briefing: Summary and Recommendations of EM Landfill Workshop Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned Environmental Management Waste Management Facility

  7. The EM Story Brochure

    Broader source: Energy.gov [DOE]

    In 2012, the EM story brochure was released to the public that provided a high-level summary and communicated EM's history, cleanup, and challenges.

  8. Oil and Gas Field Code Master List 1990

    SciTech Connect (OSTI)

    Not Available

    1991-01-04

    This is the ninth annual edition of the Energy Information Administration's (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1990 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. There are 54,963 field records in this year's Oil and Gas Field Code Master List (FCML). This amounts to 467 more than in last year's report. As it is maintained by EIA, the Master List includes: Field records for each state and county in which a field resides; field records for each offshore area block in the Gulf of Mexico in which a field resides;field records for each alias field name; fields crossing state boundaries that may be assigned different names by the respective state naming authorities.

  9. Oil and gas field code master list 1994

    SciTech Connect (OSTI)

    Not Available

    1995-01-01

    This is the thirteenth annual edition of the Energy Information Administration`s (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1994 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. The master field name spellings and codes are to be used by respondents when filing the following Department of Energy (DOE) forms: Form EIA-23, {open_quotes}Annual Survey of Domestic Oil and Gas Reserves,{close_quotes} filed by oil and gas well operators (field codes are required from larger operators only); Forms FERC 8 and EIA-191, {open_quotes}Underground Gas Storage Report,{close_quotes} filed by natural gas producers and distributors who operate underground natural gas storage facilities. Other Federal and State government agencies, as well as industry, use the EIA Oil and Gas Field Code Master List as the standard for field identification. A machine-readable version of the Oil and Gas Field Code Master List is available from the National Technical Information Service, 5285 Port Royal Road, Springfield, Virginia 22161, (703) 487-4650. In order for the Master List to be useful, it must be accurate and remain current. To accomplish this, EIA constantly reviews and revises this list. The EIA welcomes all comments, corrections, and additions to the Master List. All such information should be given to the EIA Field Code Coordinator at (214) 953-1858. EIA gratefully acknowledges the assistance provides by numerous State organizations and trade associations in verifying the existence of fields and their official nomenclature.

  10. Oil and Gas Field Code Master List - Energy Information Administration

    U.S. Energy Information Administration (EIA) Indexed Site

    Oil and Gas Field Code Master List With Data for 2015 | Release Date: February 24, 2016 | Next Release Date: February 2017 Previous Issues Year: 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1998 1997 1996 1995 Go Comprehensive listing of U.S. oil and gas field names. Oil and Gas Field Code Master List 2015 Definition of a Field A field is defined as "an area consisting of a single reservoir or multiple reservoirs all grouped on, or related to, the same

  11. EM Site-Specific Advisory Board (EM SSAB) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB)

  12. DOE NNSA Site Facility Management Contracts - MASTER.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NNSA Site Facility Management Contracts November 2015 ... Number Contract Type Business Model FY Competed Award ... Separations Process Research Unit (SPRU) EM URS Energy & ...

  13. 2010 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Improvement Project Plan 2010 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2010 Quality Assurance Improvement Project

  14. (SSS)Project Dashboard 2015-10-28.xls

    Office of Environmental Management (EM)

    2,251,500,000 R 10 EM Savannah River Nuclear Solutions, LLC SR-0030.D.C1 D-Area Ash Project 185,000,000 185,000,000 R 11 EM URS Energy & Construction, Inc....

  15. Latin-square three-dimensional gage master

    DOE Patents [OSTI]

    Jones, L.

    1981-05-12

    A gage master for coordinate measuring machines has an nxn array of objects distributed in the Z coordinate utilizing the concept of a Latin square experimental design. Using analysis of variance techniques, the invention may be used to identify sources of error in machine geometry and quantify machine accuracy.

  16. McMaster University`s artificial computing system

    SciTech Connect (OSTI)

    Dawes, A.; Bentley, M.

    1996-12-31

    This will be McMaster University`s first entry into the AAAI Mobile Robotics competition. As such, this year will serve as a testing ground for future developments. It is the goal of the designers to experiment with new techniques and approaches based on their engineering background.

  17. Assessment of the Integrated Facility Disposition Project at Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratory & Y-12 for Transfer of Facilities & Materials to EM | Department of Energy the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program

  18. Analysis of soil vapor extraction expenses to estimate bioventing expenses. Master`s thesis

    SciTech Connect (OSTI)

    Lokan, S.M.

    1995-11-01

    An in-depth analysis of the expenses incurred with five soil venting petroleum remediation projects was accomplished. The data was obtained from receipts provided by a major United States petroleum refiner and distributor. Cost categories were designed that incorporated all costs and provided a method to analyze the data. The five cost categories used were: permits, equipment, management, utilities, and analysis. Further analysis showed trends and described the behavior of the costs related to remediation events. The relative percentile for each cost category was found to be consistent among the projects. Many costs were also found to be very linear through out the life of the project from discovery to final cleanup. These linear costs for each cost category were also found to have similar slopes when comparing different projects.

  19. EM Highlights | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Highlights EM Highlights This document breaks down and highlights the EM FY 2012 budget request for the Environmental Management (EM) program for it's three appropriation accounts: ...

  20. EM Launches Comprehensive Flickr Collection

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM recently established an EM Flickr Collection, which organizes over 1,100 photos from around the EM complex.

  1. Oak Ridge's EM Program Realizes Successful 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge's EM Program Realizes Successful 2010 Oak Ridge's EM Program Realizes Successful 2010 February 7, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Cleanup at the Oak Ridge Reservation took a major leap forward in 2010, as the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) completed numerous projects that reduced risks, decreased the site's footprint, and paved the way for new development for DOE missions. Major accomplishments were completed across the Oak Ridge

  2. (SSS)Project Dashboard 2016-08-25 0900.xls

    Office of Environmental Management (EM)

    Date: 08/25/2016 Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment 1 EM Bechtel National Inc. 01-D-416 Waste Treatment and Immobilization Plant (WTP) 5,781,000,000 $ 12,263,000,000 $ R 2 EM Parsons Government Services Inc. 05-D-405 Salt Waste Processing Facility (SWPF) 900,000,000 $ 2,322,000,000 $ G 3 EM CH2M Hill Plateau Remediation Company 15-D-401 KW Basin Sludge Removal Project 311,000,000 $ 311,000,000 $ G 4 EM Savannah River

  3. Developing a master plan for hospital solid waste management: A case study

    SciTech Connect (OSTI)

    Karamouz, Mohammad Zahraie, Banafsheh Kerachian, Reza Jaafarzadeh, Nemat Mahjouri, Najmeh

    2007-07-01

    Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management.

  4. President Obama Announces New Plan to Create STEM Master Teaching Corps |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Announces New Plan to Create STEM Master Teaching Corps President Obama Announces New Plan to Create STEM Master Teaching Corps July 18, 2012 - 3:43pm Addthis *Editor's Note: This blog was originally posted on WhiteHouse.gov's Office of Sience and Technology Policy by Phil Larson. Today, the Obama Administration announced the President's plan to create a national Science, Math, Technology, and Engineering (STEM) Master Teacher Corps. The STEM Master Teacher Corps will

  5. DOE Recertifies EM Contractors in Star Program Recognizing Excellence in Safety

    Broader source: Energy.gov [DOE]

    EM congratulated two of its contractors at the Savannah River Operations and Portsmouth/Paducah Project offices for their recent Voluntary Protection Program (VPP) Star recertifications.

  6. Dr. Monica Regalbuto Lays Out Vision for Tenure as EM's New Assistant...

    Broader source: Energy.gov (indexed) [DOE]

    ... Monica Regalbuto provides the leadership necessary to continue EM's safe cleanup of the environmental legacy of the Cold War and Manhattan Project. Dr. Regalbuto has held ...

  7. Microsoft PowerPoint - Riner.EM-10 Presentation Update - EMAB...

    Office of Environmental Management (EM)

    ... How Will We Define Success? * Portfolio Success Per Root Cause Analysis Total EM Forecast ... Cleanup Success per RCA Metrics Line Item Project Success Percentage Line Item Goal ...

  8. Quantum Markovian master equation for scattering from surfaces

    SciTech Connect (OSTI)

    Li, Haifeng; Shao, Jiushu; Azuri, Asaf; Pollak, Eli Alicki, Robert

    2014-01-07

    We propose a semi-phenomenological Markovian Master equation for describing the quantum dynamics of atom-surface scattering. It embodies the Lindblad-like structure and can describe both damping and pumping of energy between the system and the bath. It preserves positivity and correctly accounts for the vanishing of the interaction of the particle with the surface when the particle is distant from the surface. As a numerical test, we apply it to a model of an Ar atom scattered from a LiF surface, allowing for interaction only in the vertical direction. At low temperatures, we find that the quantum mechanical average energy loss is smaller than the classical energy loss. The numerical results obtained from the space dependent friction master equation are compared with numerical simulations for a discretized bath, using the multi-configurational time dependent Hartree methodology. The agreement between the two simulations is quantitative.

  9. EM SSAB CHAIRS Bi-Monthly Conference Call

    Office of Environmental Management (EM)

    ... One third of the FY 2013 LLWMLLW is forecast to come from Portsmouth's Gaseous Diffusion Plant D&D project. EM is expected to complete its Waste Incidental to Reprocessing (WIR) ...

  10. DRAFT EM SSAB Chair's Meeting Waste Disposition Strategies...

    Office of Environmental Management (EM)

    ... K-West Basin Annex for sludge retrieval project www.energy.govEM 10 Office of River ... Disposal: 1,099,000 cubic feet * FY2014 Forecast: 1,441,000 cubic feet * FY2014 to date: ...

  11. EM Plan Accelerates Uranium-233 Disposal, Saves Taxpayers Half...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Related Articles Uraninum-233 Inventory in Oak Ridge Lightened with First Shipment of Material from Building 3019 Bill McMillan named federal project director for ORNL cleanup EM ...

  12. Draft SPD Supplemental EIS Master Reference List | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Draft SPD Supplemental EIS Master Reference List References for Chapters 1 - 5 References for Appendix A References for Appendix B References for Appendix C References for Appendix D References for Appendix E References for Appendix F References for Appendix G References for Appendix H References for Appendix I References for Appendix J References for Summary Learn More SPD SEIS References for Appendix C SPD SEIS References for Appendix D SPD SEIS References

  13. Oil and Gas field code master list 1995

    SciTech Connect (OSTI)

    1995-12-01

    This is the fourteenth annual edition of the Energy Information Administration`s (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1995 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the US. The Field Code Index, a listing of all field names and the States in which they occur, ordered by field code, has been removed from this year`s publications to reduce printing and postage costs. Complete copies (including the Field Code Index) will be available on the EIA CD-ROM and the EIA World-Wide Web Site. Future editions of the complete Master List will be available on CD-ROM and other electronic media. There are 57,400 field records in this year`s Oil and Gas Field Code Master List. As it is maintained by EIA, the Master List includes the following: field records for each State and county in which a field resides; field records for each offshore area block in the Gulf of Mexico in which a field resides; field records for each alias field name (see definition of alias below); and fields crossing State boundaries that may be assigned different names by the respective State naming authorities. Taking into consideration the double-counting of fields under such circumstances, EIA identifies 46,312 distinct fields in the US as of October 1995. This count includes fields that no longer produce oil or gas, and 383 fields used in whole or in part for oil or gas Storage. 11 figs., 6 tabs.

  14. EM-PDRI Manual

    Office of Environmental Management (EM)

    ... and External Independent Reviews (EIRs) EM-6 is working with OECM to establish some level of use of the EM*PDRI in their ESAAB consideration as well as in their EIR process. ...

  15. 2012 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Quality Assurance Improvement Project Plan 2012 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2012 Quality Assurance Improvement

  16. 2014 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Quality Assurance Improvement Project Plan 2014 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2014 Quality Assurance Improvement

  17. 2015 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Quality Assurance Improvement Project Plan 2015 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2015 Quality Assurance Improvement

  18. Replication of surface features from a master model to an amorphous metallic article

    DOE Patents [OSTI]

    Johnson, William L.; Bakke, Eric; Peker, Atakan

    1999-01-01

    The surface features of an article are replicated by preparing a master model having a preselected surface feature thereon which is to be replicated, and replicating the preselected surface feature of the master model. The replication is accomplished by providing a piece of a bulk-solidifying amorphous metallic alloy, contacting the piece of the bulk-solidifying amorphous metallic alloy to the surface of the master model at an elevated replication temperature to transfer a negative copy of the preselected surface feature of the master model to the piece, and separating the piece having the negative copy of the preselected surface feature from the master model.

  19. DUF6 Project Doubles Production in 2013 | Department of Energy

    Energy Savers [EERE]

    EM's Portsmouth Paducah Project Office (PPPO) and contractor Babcock & Wilcox Conversion Services LLC (BWCS) began operations in 2011 to convert the nation's 800,000-metric-ton ...

  20. Deactivation Project Begins at Paducah Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Begins at Paducah Gaseous Diffusion Plant Deactivation Project Begins at Paducah Gaseous Diffusion Plant October 21, 2014 - 5:00pm Addthis EM Paducah site lead Jennifer Woodard ...

  1. Report: EM Acquisition and Project Management

    Office of Environmental Management (EM)

    ... Clearance Initiative The DOE procurement manager published a report in December 2007, but efforts to implement its recommendations are not apparent. Lengthy business clearance ...

  2. EM Current Project Performance.xls

    Office of Environmental Management (EM)

    0 Hanford Site VL-SPRU-0040.C1 Nuclear Facility D&D - Separations Process Research Unit CD-3 78,600,000 9302012 Pending 78,600,000 9302012 Knolls Atomic Power Laboratory...

  3. Northeast Oregon Hatchery Spring Chinook Master Plan, Technical Report 2000.

    SciTech Connect (OSTI)

    Ashe, Becky L.; Concannon, Kathleen; Johnson, David B.

    2000-04-01

    Spring chinook salmon populations in the Imnaha and Grande Ronde rivers are listed as threatened under the Endangered Species Act (ESA) and are at high risk of extirpation. The Nez Perce Tribe, the Confederated Tribes of the Umatilla Indian Reservation, and Oregon Department of Fish and Wildlife, are co-managers of conservation/restoration programs for Imnaha and Grande Ronde spring chinook salmon that use hatchery supplementation and conventional and captive broodstock techniques. The immediate goal of these programs is to prevent extirpation and provide the potential for restoration once factors limiting production are addressed. These programs redirect production occurring under the Lower Snake River Compensation Plan (LSRCP) from mitigation to conservation and restoration. Both the Imnaha and Grande Ronde conservation/restoration programs are described in ESA Section 10 permit applications and the co-managers refer to the fish production from these programs as the Currently Permitted Program (CPP). Recently, co-managers have determined that it is impossible to produce the CPP at Lookingglass Hatchery, the LSRCP facility intended for production, and that without additional facilities, production must be cut from these conservation programs. Development of new facilities for these programs through the Columbia Basin Fish and Wildlife Program is considered a new production initiative by the Northwest Power Planning Council (NPPC) and requires a master plan. The master plan provides the NPPC, program proponents and others with the information they need to make sound decisions about whether the proposed facilities to restore salmon populations should move forward to design. This master plan describes alternatives considered to meet the facility needs of the CPP so the conservation program can be fully implemented. Co-managers considered three alternatives: modify Lookingglass Hatchery; use existing facilities elsewhere in the Basin; and use new facilities in

  4. EM SSAB Recommendations & Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communication & Engagement EM SSAB EM SSAB Recommendations & Letters EM SSAB Recommendations & Letters September 30, 2014 EM SSAB Recommendations and Letters - 2014-05...

  5. Sinc function representation and three-loop master diagrams

    SciTech Connect (OSTI)

    Easther, Richard; Guralnik, Gerald; Hahn, Stephen

    2001-04-15

    We test the Sinc function representation, a novel method for numerically evaluating Feynman diagrams, by using it to evaluate the three-loop master diagrams. Analytical results have been obtained for all these diagrams, and we find excellent agreement between our calculations and the exact values. The Sinc function representation converges rapidly, and it is straightforward to obtain accuracies of 1 part in 10{sup 6} for these diagrams and with longer runs we found results better than 1 part in 10{sup 12}. Finally, this paper extends the Sinc function representation to diagrams containing massless propagators.

  6. Modeling the uptake and transpiration of TCE using phreatophytic trees. Master`s Thesis

    SciTech Connect (OSTI)

    Wise, D.P.

    1997-12-01

    Phytoremediation is a recent addition to the numerous methods used today to remediate ground water contaminants. It is proving more effective and efficient compared to existing remediation techniques. The use of phreatophytes, or water seeking trees, has great potential for phytoremediation. These trees are fast growing, long lived, grow their roots down to the ground water table, transpire large amounts of water, and are proven to actively remove contaminants from the soil horizon. The purpose of this research is to develop quantitative concepts for understanding the dynamics of TCE uptake and transpiration by phreatophytic trees over a short rotation woody crop time frame. This will he done by constructing a system dynamics model of this process and running it over a wide range of conditions. This research will offer managers a tool to simulate long-term uptake and transpiration of TCE at potential sites. The results of this study indicate that TCE is actively removed from the soil horizon by phreatophytic trees and a significant proportion of this TCE is then transpired. Changes in soil horizon parameters, xylem flow rates, and variables in the uptake equation greatly influence TCE uptake rates as well as transpiration. Also, parameters used in equations representing flows in and out of the leaf greatly influence transpiration. Better understanding of these processes is essential for managers to accurately predict the amount of TCE removed and transpired during potential phytoremediation projects.

  7. Evaluation of the Mesoscale Eta Model over the western United States. Master`s thesis

    SciTech Connect (OSTI)

    Swanson, R.T.

    1995-09-10

    The skill of the Mesoscale Eta Model is evaluated over a 6-month period from October 1, 1994 to March 31, 1995 over the western United States. This model will continue to undergo changes until and after its projected operational release in July 1995. Many diagnostics and error statistics are created to evaluate its performance as forecasts are received and archived at the University of Utah. These statistics are available on the Internet allowing researchers and operational forecasters access to them in near real-time. The Mesoscale Eta Model forecast initialized at 1200 UTC, 9 November 1994 is used as a case study to introduce many of the diagnostics developed to evaluate the model. A systematic evaluation of the average and root-mean-squared error over months and seasons reveals little significant bias in upper tropospheric fields such as 300 mb wind or 500 mb geopotential height. Moderate average errors are evident in lower tropospheric temperature. Accumulated precipitation over months and seasons indicates the model`s spinup of precipitation during the first 12 hours of the forecast cycle.

  8. Coupled simulation of the reactor core using CUPID/MASTER

    SciTech Connect (OSTI)

    Lee, J. R.; Cho, H. K.; Yoon, H. Y.; Jeong, J. J.

    2012-07-01

    The CUPID is a component-scale thermal hydraulics code which is aimed for the analysis of transient two-phase flows in nuclear reactor components such as the reactor vessel, steam generator, containment. This code adopts a three-dimensional, transient, two-phase and three-field model, and includes physical models and correlations of the interfacial mass, momentum, and energy transfer for the closure. In the present paper, a multi-physics simulation was performed by coupling CUPID with a three dimensional neutron kinetics code, MASTER. MASTER is merged into CUPID as a dynamic link library (DLL). The APR1400 reactor core during a control rod drop/ejection accident was simulated as an example by adopting a porous media approach to employ a fuel assembly. The following sections present the numerical modeling for the reactor core, coupling of the kinetics code, and the simulation results. And also, a preliminary study for multi-scale simulation between CUPID and system-scaled thermal hydraulics code, MARS will be introduced as well. (authors)

  9. Thermodynamics of the polaron master equation at finite bias

    SciTech Connect (OSTI)

    Krause, Thilo Brandes, Tobias; Schaller, Gernot; Esposito, Massimiliano

    2015-04-07

    We study coherent transport through a double quantum dot. Its two electronic leads induce electronic matter and energy transport and a phonon reservoir contributes further energy exchanges. By treating the system-lead couplings perturbatively, whereas the coupling to vibrations is treated non-perturbatively in a polaron-transformed frame, we derive a thermodynamic consistent low-dimensional master equation. When the number of phonon modes is finite, a Markovian description is only possible when these couple symmetrically to both quantum dots. For a continuum of phonon modes however, also asymmetric couplings can be described with a Markovian master equation. We compute the electronic current and dephasing rate. The electronic current enables transport spectroscopy of the phonon frequency and displays signatures of Franck-Condon blockade. For infinite external bias but finite tunneling bandwidths, we find oscillations in the current as a function of the internal bias due to the electron-phonon coupling. Furthermore, we derive the full fluctuation theorem and show its identity to the entropy production in the system.

  10. Headquarters Facilities Master Security Plan- Chapter 11, Incidents of Security Concern

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 11, Incidents of Security Concern Describes DOE Headquarters procedures for reporting, investigating, and correcting Incidents of Security Concern.