Powered by Deep Web Technologies
Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Management of corrective action wastes pursuant to proposed Subpart S  

SciTech Connect

Under Section 3004(u) of the Resource Conservation and Recovery Act (RCRA), owners/operators of permitted or interim status treatment, storage, and disposal facilities (TSDFs) are required to perform corrective action to address releases of hazardous waste or hazardous constituents from solid waste management units (SWMUs). On July 27, 1990, the Environmental Protection Agency (EPA) proposed specific corrective action requirements under Part 264, Subpart S of Title 40 of the code of Federal Regulations (CFR). One portion of this proposed rule, addressing requirements applicable to corrective action management units (CAMUs) and temporary units (TUs), was finalized on February 16, 1993 (58 FR 8658 et seq.). (CAMUs and TUs are RCRA waste management units that are specifically designated for the management of corrective action wastes). Portions of the proposed Subpart S rule that address processes for the investigation and cleanup of releases to environmental media have not yet been finalized. EPA and authorized State agencies, however, are currently using the investigation and cleanup procedures of the proposed rule as a framework for implementation of RCRA`s corrective action requirements. The performance of corrective action cleanup activities generates wastes that have to be characterized and managed in accordance with applicable RCRA requirements. This Information Brief describes these requirements. It is one of a series of information Briefs on RCRA Corrective Action.

Not Available

1995-02-01T23:59:59.000Z

2

Proposed Action  

E-Print Network (OSTI)

Plan and made determinations of “may effect, likely to adversely affect ” for the Pitcher's thistle, Kirtland's warbler, bald eagle, piping plover, Karner blue butterfly, and Indiana bat. The Forest made a determination of “may effect, not likely to adversely affect ” for designated piping plover critical habitat. September 16, 2005: The Service responded to the Forest’s request for formal consultation, indicating that the information received in the BA constituted a complete initiation package. September – December 2005: Jessica Hogrefe (USFWS) worked with Forest biologists via email and telephone to discuss the proposed Plan and effects to listed species.

U. S. Fish; Wildlife Service

2006-01-01T23:59:59.000Z

3

Environmental Assessment - Proposed Actions  

NLE Websites -- All DOE Office Websites (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

4

Description of Proposed Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

5

Riverland expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

6

POSITION MANAGEMENT ACTION FORM  

E-Print Network (OSTI)

POSITION MANAGEMENT ACTION FORM Workforce Planning | 408-924-2250 classcomp@sjsu.edu SJSU Human FOR POSITION MANAGEMENT FORM Workforce Planning | 408-924-2250| classcomp@sjsu.edu SJSU Human Resources Revised contact your Workforce Planning Analyst. List the name of the position this position reports to

Eirinaki, Magdalini

7

Proposed Changes to Emergency Action Levels  

E-Print Network (OSTI)

Reference (a) provided proposed changes to Vermont Yankee's (VY's) Emergency Action Levels (EALs). This letter provides additional information requested by USNRC staff during a telecon held on

Vermont Yankee; Gautam Sen; Richard J. Conte; Emergency Preparedness; Safeguards Branch; Division Of Reactor

8

N Springs expedited response action proposal  

SciTech Connect

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

9

Property:NEPA Proposed Action | Open Energy Information  

Open Energy Info (EERE)

Proposed Action Proposed Action Jump to: navigation, search Property Name NEPA Proposed Action Property Type Text Pages using the property "NEPA Proposed Action" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + NGP is proposing a geothermal development project which includes the construction and operation of power generation facilities, geothermal fluid production and injection well pads and wells, access roads, geothermal fluid pipelines, groundwater production wells, an electrical transmission line and switching station, and support facilities. NGP submitted an application (N-82701) and Plan of Development (PoD) to the BLM Winnemucca Field Office (WFO), for approval of a right-of-way (ROW) for those portions of the transmission line located on public lands managed by the BLM. SPPCo submitted an application (N-83479) to the BLM WFO for approval of a ROW for the electrical switching station to be built at the point of interconnection of the NGP transmission line with the existing SPPCo transmission line. An Operations Plan was submitted for approval to drill and test geothermal wells proposed on public land (within federal geothermal lease NVN-58196) which would be used for the project. A Utilization Plan was submitted for approval of utilization facilities proposed on public land to be used for the project. Geothermal Drilling Permits (GDPs) will be submitted for downhole casing and cementing engineering approval for each well as the project progresses.

10

Chapter 2 - Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES The WIPP facility, in addition to serving its primary mission as a TRU waste disposal site, needs to perform a variety of actinide chemistry experiments to (1) support WIPP's recertification efforts, (2) address scientific questions important to WIPP, (3) improve TRU waste characterization techniques, and (4) improve DOE's understanding of how the waste interacts with the natural environment in order to better understand waste isolation performance. In the past, WIPP-related actinide chemistry experiments have taken place at DOE laboratory facilities at other DOE sites such as LANL. However, due to reductions in travel budgets and additional security requirements being imposed on DOE weapons

11

VA Energy Management Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

12

Chapter 4 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

need for the project and achieve the project's purposes (see Section 1.3, Purposes). BPA developed four action alternatives from combinations of the route segments and...

13

Implementation Proposal for The National Action Plan on Demand Response |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

14

ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE  

Office of Legacy Management (LM)

ACTION DESCRIPTION MEMORANDUM ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 1 Background and Need for Action ..................... 2 Proposed Remedial Action ........................ 3 Potential Issues ................... ......... 4 Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 6 Tables. ............ .................. 7 References ................... ............ 8

15

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

can be regenerated electrically for use in future high efficiency electric vehicle (EV) heat pumps. Proposed work consists of indoor laboratory-based research and development,...

16

4.0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES 0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES This chapter evaluates the environmental consequences of the proposed action (Section 4.1) and of the alternatives (Section 4.2) . The analysis focuses primarily on impacts associated with routine operation of the glass melter. In some instances (such as human health) , additional analysis is provided for accident conditions. 4.1 THE PROPOSED ACTION The proposed action was evaluated to determine the potential impacts of a number of environmental components, including air quality, surface water quality, and biological resources, as well as the potential effects to human health and safety. The potential impacts to these receptors are evaluated in the following subsections. No impact pathways were identified for land use, socioeconomics, or groundwater resources.

17

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND 4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES . This section describes potential environmental impacts of the proposed action and alternatives. If the proposed action is implemented, activities would be limited to existing facilities. A WERF modification would be required to allow for injection of an atomized aqueous waste stream into the incinerator lower chamber. The installation would be performed within the WERF incinerator/stabilization building and may use an existing incinerator access port. Installation work would be similar to many routine maintenance and modification actions at WERF. A detailed analysis of potential impacts from processing INEL-generated LL W at commercial facilities is not presented in this EA because specific commercial facilities and processes have not

18

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'u ", lt~Fs::::N 'u ", lt~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to construct a maintenance garage for heavy vehicles and equipment at the Springfield, Missouri facility. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 7,2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.15- Siting, construction or modification of support structures within or contiguous to an already developed area. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the

19

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

20

Action and Inaction Levels in Pest Management.  

E-Print Network (OSTI)

~AMPHIB THIS MATERIAL MAY NOT BE REMOVED FROl\\11 ,THE LIBRARY Action & Inaction Levels in Pest Management THE TEXAS AGRICULTURAL EXPERIMENT STATION I Nevil le P. Clarke I The Texas A&M University System I ColleQe Station, Texas B-1480 July... 1984 Action and Inaction Levels in Pest Management Winfield Sterling Department of Entomology Texas A&M University and The Texas Agricultural Experiment Station College Station, Texas 77843 Contents Introduction...

Sterling, Winfield

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Transition of Long-Term Response Action Management Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transition of Long-Term Response Action Management Requirements Transition of Long-Term Response Action Management Requirements The purpose of this memorandum is to provide you...

22

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

proposes to add additional shop and office space onto two existing facilities proposes to add additional shop and office space onto two existing facilities located at the Jonesboro, Arkansas Maintenance Facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: May 09, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0 , Part B1 .15- Siting, construction or modification, and operation of support buildings and structures within or contiguous to an already developed area . REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class,

23

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

install pole-mounted safety light(s) at the Gore, Oklahoma install pole-mounted safety light(s) at the Gore, Oklahoma substation facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: September 1, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0, Part B2.3- Installation of equipment for personnel safety and health. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A& B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the proposal must riot: (a.) Threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, including DOE and/or Executive Orders;

24

BPA's Proposed Oversupply Management Protocol Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

M I N I S T R A T I O N BPA's Proposed Oversupply Management Protocol February 14, 2012 BPA Rates Hearing Room To participate by phone please call (888) 296-1938 and enter 563088...

25

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Power Administration and the system of Entergy in Carroll County, Arkansas. The interconnection would require Entergy to construct a new switching station at the interconnection site in addition to an approximately 5 mile length of transmission line. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: April 11,2011 NUMBERS AND TIT!-ES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.12- Construction of electric powerlines approximately 10 miles in length or less, not integrating major new sources. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes

26

Microsoft Word - Updated Proposed Action 2004 SA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2004 December 27, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE/EIS-0312/SA-01) Sarah McNary Senior Policy Advisor Proposed Action: Updated Proposed Action (UPA) for the FCRPS Biological Opinion Remand Location: The action area of the UPA, including areas where the UPA directly or indirectly affects listed salmonids consists of the following areas: * The mainstem Columbia River, including and downstream of Libby and Hungry Horse dams and reservoirs; the Snake River below the confluence with the Salmon River; and the Clearwater River below Dworshak reservoir and dam, down to and including the Columbia River estuary and plume. * The estuary and plume, which includes the area immediately off the mouth of the Columbia

27

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'IU "~I :~~~r;::::N 'IU "~I :~~~r;::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to perform aerial saw tree trimming activities along select portions of transmission line rights-of-ways located in eastern Oklahoma during the early winter of 2011. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 10, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.3- Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and railroads), vehicles and equipment, and localized vegetation and pest control, during which operations may be suspended and resumed.

28

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

NLE Websites -- All DOE Office Websites (Extended Search)

CATEGORICAL EXCLUSION (CX) DETERMINATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of

29

CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Zi~Fs::::N Zi~Fs::::N CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to accommodate a request, on behalf of Farrell- Cooper Mining Company, to lower and bury a small section of Southwestern's electrical lines to allow for the crossing of a large piece of mining equipment through the transmission line rights-of-way in Haskell County, Oklahoma. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart D, Part B4.9- Grant or denial of requests for multiple use of transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and

30

Categorical Exclusion Determination Form Proposed Action Title: (0675-1570) Washington University in St. Louis -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) Washington University in St. Louis - 0) Washington University in St. Louis - Optimal Operation and Management of Energy Storage Systems Based on Real-Time Predictive Modeling and Adaptive Battery Management Techniques Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): St. Louis, MO; Golden, CO Proposed Action Description: Funding will support efforts to develop a battery management system for electric vehicle batteries capable of accurately predicting a battery's charge and health in order to make control decisions that improve battery safety, charging rate, useful capacity, and battery lifetime. Proposed work will consist of: (1) development of baseline physics models for the battery management; (2) optimization of the baseline physics

31

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~~Fs::::N ~~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration performed emergency construction activities to repair a levee, stabilize a bank, and complete drainage improvements as a result of damage incurred during recent heavy rains at the Jonesboro Maintenance Office and adjacent substation facility located in Craighead County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart 0 , Part B 2.5- Safety and environmental improvements of a facility, including replacement and upgrade of facility components, that do not result in a significant change in the

32

Categorical Exclusion (CX) Determination Proposed Action: Havre Substation, Stage 03.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Havre Substation, Stage 03. Havre Substation, Stage 03. Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the Havre Substation approximately 150 ft to the north to accommodate a new delivery service from the newly built Herron Substation by Hill County. The expansion also converts the existing 115-kV single bus into a ring bus which will improve reliability. Western is also expanding the yard to the east to accommodate the replacement of the existing control building and control boards. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.11: Construction of electric power substations .. . or modification of existing substations and support facilities . Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

33

Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment n rgy partment n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. - Highly Dispatchable and Distributed Demand Response for the Integration of Distributed Generation Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): California and New York Proposed Action Description: Funding will support development a highly distributed Demand Response Optimization and Management System for Real-time (DROMS-RT) power flow control software to support large scale integration of distributed renewable generation sources into the electricity grid. Proposed work consists of (1) developing a web-based software platform to enable full DROMS-RT functionality; (2) developing standards for

34

Categorical Exclusion Determination Form Proposed Action Title: (0675-1578) Robert Bosch LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8) Robert Bosch LLC - 8) Robert Bosch LLC - Advanced Battery Management System Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): Bosch RTC (Palo Alto, CA); Cobasys, LLC (Orion, MI); University of California - San Diego (San Diego, CA) Proposed Action Description: Funding will support efforts to develop an adaptive battery management system that controls battery charging and discharging so as to enable fuller, more efficient battery utilization . Proposed work will consist of: (1 ) development of real-time estimation and control strategies for estimating battery performance; (2) design , development, and fabrication of small-scale Lithium-ion battery cells with an electrochemical-based battery management system; and (3) conducting analytical modeling and testing to characterize and validate system performance.

35

Federal Energy Management Program: Develop an Institutional Change Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Develop an Develop an Institutional Change Action Plan for Sustainability to someone by E-mail Share Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Facebook Tweet about Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Twitter Bookmark Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Google Bookmark Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Delicious Rank Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Digg Find More places to share Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on AddThis.com...

36

Request for Personnel Actions (For Managers and Adminstrative Officers) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Personnel Actions (For Managers and Adminstrative Request for Personnel Actions (For Managers and Adminstrative Officers) Request for Personnel Actions (For Managers and Adminstrative Officers) Headqaurters uses the CHRIS Workflow Tool to submit and process Personnel Actions. There is no longer a need for a hard copy Standard Form-52 (SF-52). Each personnel action is approved via CHRIS workflow and is the official SF-52. All actions must be in the Human Resource office (Personnel Inbox - Step 8) for processing by the Friday before the effective date of the action. All supporting documentation must be attached or this will delay the process, causing the Human Resources Office to change the effective date to the next pay period. The manager or administrative officer must initiate the action in workflow along with assigning approving officials (the same approving

37

Sustainable Energy Action Plans: Project Management Intercomparison  

Science Journals Connector (OSTI)

Abstract This paper explores the content of various Sustainable Energy Action Plans (SEAPs) necessary to the Covenant of Mayors. This study has the aim of providing an overview of existing methodologies for the development and implementation of \\{SEAPs\\} by municipalities. As the number and complexity of issues related with energy are very broad, it is very important to know and identify good practices and guidelines to increasing participant municipalities. Based on the methodologies collected in several studies, it is possible to identify key aspects and issues municipalities might consider for the development of their own plan. The SEAP can’t be only a collection of measures; it must have a coherent strategy with the European and National policies. This study also shows that a good coordinator with project management skills is necessary to overcome obstacles due to the lack of communication or collaboration among the different municipality's departments.

Eurico Vasco Amorim

2014-01-01T23:59:59.000Z

38

Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites  

Energy.gov (U.S. Department of Energy (DOE))

Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008)

39

Categorical Exclusion Determination Form Proposed Action Title: (0473-1529) Charles River Associates International Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29) Charles River Associates International Inc. - 29) Charles River Associates International Inc. - Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Massachusetts, Pennsylvania, Washington Proposed Action Description: Funding will support development of Topology Control, an algorithmic and software technology framework that will improve the efficiency of the electrical grid by implementing appropriate short-term changes of transmission line status to manage transmission congestion and uncertainties associated with integration of renewable generation sources into the electricity grid. Proposed work consists of (1) developing and validating a large power system model that accurately simulates day-ahead and intra-day power

40

A proposed model for library stacks management  

Science Journals Connector (OSTI)

This article aims to present a new model of stacks management of libraries. Since space management is constantly an important issue for libraries, especially for those in metropolitan areas. The cost of space is perceived as one of the library's invisible expenses. By changing the layout of the book stacks and the management principles as well as employing the RFID facilities, a new stacks management model called “parent–child–grandchild” model is developed. In the model, three stacks sections with different functions collaborate to facilitate the cost-effective space utilization of the library. Library users’ book seeking behavior is changed toward the positive.

Hao-chang Sun; Kuan-nien Chen

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Bureau of Land Management - Techniques for Documenting a No Action...  

Open Energy Info (EERE)

for Documenting a No Action Alternative in an EA Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Techniques for Documenting...

42

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Southwestern) proposes to replace the shield wire, fiber-optic cable, (Southwestern) proposes to replace the shield wire, fiber-optic cable, conductor, structures, and all associated hardware on the Idalia to Asherville 161 kV, 22 mile transmission line located in Butler and Stoddard County, Missouri. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: October 13,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including , but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors,

43

SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning  

E-Print Network (OSTI)

Planning Tools from Morehead A Word about Morehead's Workforce Commitment Model Technical Support Section 2 Activities Appendices Appendix 1 ­ Workforce Commitment Domains Summary Appendix 2 ­ Action Plan Form #12SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help

Squire, Larry R.

44

Cleanup Actions Proposed for g-2, BLIP, and Former Underground  

E-Print Network (OSTI)

: Supporting Documentation for the Proposed Plan,AOC 12 and AOC 16K, and the BNL g-2 Source Area andTritium Plume ­ AOC 16T Focused Feasibility Study.The public is also invited to provide comments on them to DOE

45

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Oklahoma, and Missouri communication tower facilities to facilitate the spectrum relocation of Federal communications systems in conjunction with the Commercial Spectrum Enhancement Act (CSEA, Title II of P.L. 108-494). Communication tower facility modifications and construction activities include 13 tower replacements, 16 tower removals, and 6 communication site dispositions. The 35 tower project locations, identified by state, include: ~ Arkansas- Hardy, Melbourne, Paragould, Piggott, Bethel, Bull Shoals, Norfork, Piggott, Poteau Mountain, Decatur, Sulphur Rock, Van Buren, Winesburg, and Humphrey ~ Oklahoma- Broken Bow Project Office, Broken Bow Powerhouse, Gore Substation, Lamar, Weleetka,

46

Expedited response action proposal for 316-5 process trenches  

SciTech Connect

A summary of the evaluation of remedial alternatives for the 300 Area Process Trench sediment removal at Hanford is presented. Based on the preliminary technology screening, screening factors, and selection criteria the preferred alternative for the 300 Area Process Trench is to remove and interim stabilize the sediments within the fenced area of the process trenches. This alternative involves proven technologies that are applied easily at this mixed waste site. This alternative removes and isolates contaminated sediments from the active portion of the trenches allowing continued used of the trenches until an inspection and treatment facility is constructed. The alternative does not incorporate any materials or actions that preclude consideration of a technology for final remediation of the operable unit. The estimated initial and annual costs would enable this alternative to be implemented under the guidelines for an EPA- funded ERA ($2 million). Implementation of the alternative can be accomplished with trained personnel using familiar procedures to provide a safe operation that accomplishes the objective for removing a potential source of contamination, thereby reducing potential environmental threat to groundwater. 18 refs., 5 figs., 9 tabs.

Not Available

1991-07-01T23:59:59.000Z

47

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

obtain an easement for an existing access road obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of the transferred structures and equipment, for residential, commercial, or industrial uses. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B):

48

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

385: Notice of Proposed Floodplain and Wetland Actions 385: Notice of Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

49

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Floodplain and Wetland Actions Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

50

DOE Issues Draft Request for Proposals Seeking Contractor to Manage,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Draft Request for Proposals Seeking Contractor to DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant April 1, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP)seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico. The estimated value of the anticipated contract is from $130 to $160 million per year, for five years, with an option to extend the contract for an additional five years. DOE anticipates awarding a competitive, cost-plusaward-fee

51

BPA's proposed oversupply management protocol for comment, Feb...  

NLE Websites -- All DOE Office Websites (Extended Search)

to curtail their output if necessary. There is also an associated proposal for how BPA would recover the new costs that would be incurred. During spring 2011, BPA managed...

52

Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nergy nergy Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories - Improved Power System Operations Using Advanced Stochastic Optimization Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): New Mexico, Iowa, Massachusetts, Washington, and California Proposed Action Description: Funding will support development of an integrated probabilistic decision-making software that can account for uncertain conditions that affect renewable energy sources to ensure reliable and efficient use of power system assets and enforce AC power flow constraints. Proposed work consists of (1) developing a two-stage optimized algorithm for the stochastic unit commitment and economic dispatch and pricing

53

RCRA corrective action definitions under Subpart F and proposed Subpart S. RCRA Information Brief  

SciTech Connect

If EPA or the authorized State determines there has been a release of a hazardous waste or hazardous waste constituent at an interim status facility, RCRA Section 3008(h)(1) authorizes EPA or the authorized State to issue an administrative order requiring corrective action or other measures. There are no regulations specifically addressing corrective action orders under Subpart F. However, while an interim status facility is seeking a RCRA permit, the facility is required by 40 CFR 265 Subpart F to monitor ground water and report the results of this monitoring program to the regulatory agency. If a release of a hazardous waste or hazardous waste constituent occurs, the facility may be issued a RCRA Section 3008(h) Order to conduct corrective action. While the proposed Subpart S regulations apply specifically to SWMUs at permitted TSDFs, EPA intends to use similar corrective action requirements at interim status facilities where there has been a release of a hazardous waste or hazardous waste constituent. The specific requirements for corrective action at an interim status facility will be specified in a RCRA Section 3008(h) Order. Alternatively, EPA may compel corrective action under proposed Subpart S through a permit Schedule of Compliance, especially if the permit is expected to be issued in the near term. This information Brief discusses the terminology used in the two corrective action programs and discusses both the proposed Subpart S rule and the final CAMU and TU rule.

Not Available

1994-03-01T23:59:59.000Z

54

Corrective Action Management Units and Temporary Units. RCRA Information Brief  

SciTech Connect

On February 16, 1993 the EPA published a final rule that allows either the EPA Regional Administrator or the authorized State to designate areas as corrective action management units (CAMUs) at hazardous waste management facilities for the specific purpose of managing remediation waste that has been generated as part of the facility`s corrective action activities. According to the rule, placement of remediation wastes into or within a CAMU does not constitute land disposal of hazardous waste and is not subject to RCRA land disposal restrictions. In addition, waste disposal units located within CAMUs are not required to be designed in accordance with RCRA minimum technological requirements applicable to land disposal units. This Information Brief explains the advantages of a CAMU designation, defines a Temporary Unit (TU) and explains the advantages of a TU designation. The process for initiating a CAMU or TU designation is described for DOE sites and interim status facilities.

Not Available

1994-03-01T23:59:59.000Z

55

Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rtm nt n rgy rtm nt n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station - Robust Adaptive Topology Control (RATC) Program or Pield Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Texas, Arizona, California, New Jersey, and Tennessee. Proposed Action Description: Funding will support development an algorithmic Topology Control software to enable real-time, automated control over the transmissions lines within the electricity grid during unexpected power supply interruptions caused by intermittent availability of renewable generation sources, and cascading network failures due to extreme operating conditions or malicious attacks. Proposed work consists of (1) developing a fast, adaptive topology control algorithm to identify actions that will mitigate effects of unexpected

56

Transformational Energy Action Management (TEAM) Wireless Energy Efficiency Keys Initiative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by by Transformational Energy Action Management (TEAM) Wireless Energy Efficiency Keys Initiative *Ways of Using Wireless Technology to Help You Reduce Energy Usage at your Facility Together with our industry partners, we strive to: * Accelerate adoption of the many energy-efficient technologies and practices available today * Conduct vigorous technology innovation to radically improve future energy diversity, resource efficiency, and carbon mitigation * Promote a corporate culture of energy efficiency and carbon management What Is the Industrial Technologies Program ? The Industrial Technologies Program (ITP) is the lead federal agency responsible for improving energy efficiency in the largest energy-using sector of the country. Industrial Sector National Initiative

57

Proposed platform for improving grid security by trust management system  

E-Print Network (OSTI)

With increasing the applications of grid system, the risk in security field is enhancing too. Recently Trust management system has been recognized as a noticeable approach in enhancing of security in grid systems. In this article due to improve the grid security a new trust management system with two levels is proposed. The benefits of this platform are adding new domain in grid system, selecting one service provider which has closest adaption with user requests and using from domains security attribute as an important factor in computing the trust value.

Siadat, Safieh; Mohsenzadeh, Mehran

2009-01-01T23:59:59.000Z

58

Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rgy rgy ·Submitby£-mail Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. - Dual Bi-Directional Silicon IGBTs Modules Enables Breakthrough PV Inverter Using Current-Modulation Topology Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCitY/County/State): California, New York, Virginia, Texas Proposed Action Description: Funding will support development of a low-cost, high-efficiency 100 kW power inverter to connect photovoltaic (PV) solar panels to the grid, using revolutionary bi-directiona linsulated gate bipolar transistor (BD-IGBT) switches and dual chip modules. Proposed work consists of indoor laboratory-based research and development (R&D) and semiconductor fabrication, including (1) device

59

Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment of n rgy partment of n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research - Nanoclay-reinforced Ethylene-Propylene-Rubber for Low Cost HVDC Cabling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) (City/County/State): Niskayuna, NY Proposed Action Description: Funding will support development of a low cost, extrudable, nanoclay-reinforced ethylene-propylene-rubber (EPR) for making high voltage direct current (HVDC) cable. Proposed work will consist of (1) indoor, laboratory-based synthesis, characterization, and testing of nanoclay-reinforced EPR and (2) computer- based modeling of the performance characteristics and production cost of the nanoclay-reinforced EPR HVDC cable at full scale.

60

Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partme t nerg partme t nerg Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory - Reversible Metal Hydride Thermal Storage for High Temeprative Power Generation Systems Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah and Washington Proposed Action Description: Funding will support development of a novel, metal hydride-based thermal energy storage (TES) system for use with concentrated solar power or nuclear power generating systems. Proposed work consists of indoor laboratory-based research and development, including (1) materials synthesis, characterization, and testing to develop and optimize reversible metal hydride materials, (2) design and fabrication of a bench-scale 3kWh prototype TES unit, and (3) testing,

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rg rg Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center - Thermal Storage Using Hybrid Vapor Compression Adsorption System Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): Connecticut, Michigan Proposed Action Description: Funding will support development of an advanced climate control system for plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) utilizing a hybrid thermal battery that employs a unique approach of adsorbing refrigerant on a metal salt. Proposed work consists of indoor laboratory-based research and development and office-based engineering analysis, including (1) synthesis, characterization, and testing of metal salts and refrigerant fluids for use in the thermal battery system, (2) computer-based design and

62

Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'Department of Energy 'Department of Energy Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) - Chilled Natural Gas for At-Home Refueling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Troy, NY; Columbia, MO Proposed Action Description: Funding will support efforts to develop a compressor technology for at-home refueling of natural gas vehicles. Proposed work will consist of: (1) development, synthesis, and testing of small quantities of adsorbent material at a dedicated laboratory facility on the University of Missouri campus in Columbia, MO; (2) design, fabrication (or procurement), and testing of compressor system components, including a cryocooler and an accumulator, at Chart Industries, Inc.'s commercial development and assembly site in Troy, NY; and (3) assembly

63

Categorical Exclusion (CX) Determination Proposed Action: Expansion of O'Fallon Creek Substation Yard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expansion of O'Fallon Creek Substation Yard Expansion of O'Fallon Creek Substation Yard Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the current yard to accommodate an additional bay for a dedicated electrical feed to a future oil pumping station that will be part of the Keystone XL project. Number and Title of Categorical Exclusions Being Applied: 10 CFR 10210410 Subpmi D, Appendix B, B4.11: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with the Regulatory Requirements for the National Environmental Policy Act at 10 CFR 1021AI0(b), require the following determinations be made in order for a proposed action to be categorically

64

An Illustration of the Corrective Action Process, The Corrective Action Management Unit at Sandia National Laboratories/New Mexico  

SciTech Connect

Corrective Action Management Units (CAMUs) were established by the Environmental Protection Agency (EPA) to streamline the remediation of hazardous waste sites. Streamlining involved providing cost saving measures for the treatment, storage, and safe containment of the wastes. To expedite cleanup and remove disincentives, EPA designed 40 CFR 264 Subpart S to be flexible. At the heart of this flexibility are the provisions for CAMUs and Temporary Units (TUs). CAMUs and TUs were created to remove cleanup disincentives resulting from other Resource Conservation Recovery Act (RCRA) hazardous waste provisions--specifically, RCRA land disposal restrictions (LDRs) and minimum technology requirements (MTRs). Although LDR and MTR provisions were not intended for remediation activities, LDRs and MTRs apply to corrective actions because hazardous wastes are generated. However, management of RCRA hazardous remediation wastes in a CAMU or TU is not subject to these stringent requirements. The CAMU at Sandia National Laboratories in Albuquerque, New Mexico (SNL/NM) was proposed through an interactive process involving the regulators (EPA and the New Mexico Environment Department), DOE, SNL/NM, and stakeholders. The CAMU at SNL/NM has been accepting waste from the nearby Chemical Waste Landfill remediation since January of 1999. During this time, a number of unique techniques have been implemented to save costs, improve health and safety, and provide the best value and management practices. This presentation will take the audience through the corrective action process implemented at the CAMU facility, from the selection of the CAMU site to permitting and construction, waste management, waste treatment, and final waste placement. The presentation will highlight the key advantages that CAMUs and TUs offer in the corrective action process. These advantages include yielding a practical approach to regulatory compliance, expediting efficient remediation and site closure, and realizing potentially significant cost savings compared to off-site disposal. Specific examples of CA MU advantages realized by SNL/NM will be presented along with the above highlighted process improvements, Integrated Safety Management System (ISMS) performance, and associated lessons learned.

Irwin, M.; Kwiecinski, D.

2002-02-26T23:59:59.000Z

65

Categorical Exclusion Determination Form Proposed Action Title: (0473-1543) Georgia Tech Research Corporation-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1543) Georgia Tech Research Corporation- 3-1543) Georgia Tech Research Corporation- Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-Reliable Green Electricity Internetworks Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Georgia Proposed Action Description: Funding will support development of an internet-like software architecture capable of independently controlling and coordinating distributed energy sources generated by "prosumers," such as wind and solar power, to improve the reliability, efficiency, flexibility, and communications within the electrical grid. Proposed work consists of (1) developing an independently networked inverter controller that incorporates Kuramoto oscillators to reduce required

66

Categorical Exclusion Determination Form Proposed Action Title: (0470-1541) Chromatin Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41) Chromatin Inc. - 41) Chromatin Inc. - Plant Based Sesquiterpene Biofuels Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Kansas, Kentucky, Illinois, Ohio Proposed Action Description: Funding will support development of genetically modified (GM) sweet sorghum (Sorghum bicolor) to produce increased levels of farnesene , a drop-in biofuel. Proposed work will consist of (1) transforming sweet sorghum with mini-chromosomes carrying limiting genes and metabolic pathway genes to increase farnesene synthesis; (2) evaluating and optimizing genes from plants, E. coli, and yeast (Saccharomyces cerevisiae) to improve enzymatic activity and specificity; (3) testing plasmid constructs and evaluating optimized genes in a model plant, guayule

67

Categorical Exclusion Determination Form Proposed Action Title: (0675-1511) Ford Motor Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11) Ford Motor Company - 11) Ford Motor Company - High Precision Tester for Automotive and Stationary Batteries Program or Field Office:Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Dearborn, MI; Albuquerque, NM; College Station, TX Proposed Action Description: Funding will support efforts to develop a high precision battery tester to measure key battery characteristics during charge/discharge cycles to improve the accuracy and precision of Columbic Efficiency and predicted life expectancy estimates. Proposed work will consist of: (1) development and validation of a low current battery tester that meets established performance objectives and (2) development and validation a high current battery tester that meets established performance objectives.

68

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance Appliance Standards Program The FY 2003 Priority- Setting Summary Report and Actions Proposed Date: August 22, 2002 Table of Contents i EXECUTIVE SUMMARY.............................................................................................. iv 1 Energy Conservation Program - Product Prioritization Process.......1-1 1.1 Background on Appliance Standards Program........................................... 1-1 1.2 DOE Authority to Add Products ................................................................ 1-2 1.2.1 Consumer Products .................................................................................... 1-3 1.2.2 Commercial Products................................................................................. 1-5 1.2.2.1 Products Regulated under EPCA Provisions Concerning Consumer

69

Categorical Exclusion Determination Form Proposed Action Title: (0473-1520) Michigan State Un  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1520) Michigan State Un 3-1520) Michigan State Un iversity - Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): East Lansing, MI Proposed Action Description: Funding will support the development of a transformer-less unified power flow controller (UPFC) that can efficiently and economically control distributed and intermittent power flow generated by wind and solar power sources through existing transmission lines. Proposed work will consist of indoor activities to (1) engage in a system-level simulation of the new UPFC with a real-time simulator; (2) design, develop , and electronically fabricate three prototype 15-kV/1.5-MVA transformer-less UPFCs; (3) construct a temporary, 15-kV mobile testing

70

Categorical Exclusion Determination Form Proposed Action Title: (0208-1695) Sustainable Energy Solutions LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

208-1695) Sustainable Energy Solutions LLC - 208-1695) Sustainable Energy Solutions LLC - Cryogenic Carbon Capture (Phase 2) Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah; Wyoming Proposed Action Description: Funding will support development of a cryogenic carbon capture (CCC) process for separating carbon dioxide from flue gas via desublimination of the flue gas and compression of the resulting solid and liquid products. Proposed work will consist of (1) design, fabrication/acquisition, and testing of components for the pilot-scale prototype CCC system; (2) integration of the components into a skid-mounted, pilot-scale prototype CCC system; and (3) testing of the skid-mounted, pilot-scale prototype CCC system using actual or simulated flue gas streams.

71

Categorical Exclusion Determination Form Proposed Action Title: (0675-1534) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34) GE Global Research - 34) GE Global Research - Control Enabling Solutions with Ultrathin Strain and Temperature Sensor System for Reduced Battery Life Cycle Cost Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Ann Arbor, MI; Dearborn, MI Proposed Action Description: Funding will support efforts to develop a a novel sensor system with supporting multi-physics models to increase battery cell lifetime and extend battery range for electric vehicle applications. Proposed work will consist of: (1) development and fabrication a novel multi-measurand sensor capable of measuring strain and temperature across multiple battery cells; (2) performance of strain and temperature testing and development and validation of multi-physics models; (3)

72

Categorical Exclusion Determination Form Proposed Action Title: (0474-1592) Satcon Technology Corp. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-1592) Satcon Technology Corp. - 4-1592) Satcon Technology Corp. - Agile Direct Grid Connect Medium Voltage 4.7-13.8kV Power Converter for PV Applications Utilizing Advanced Wide Band Gap Devices Program or Field Office:Advanced Research Projects Agency - Energy Location{s) (City/County/State): Massachusetts, New Mexico, North Carolina, Pennsylvania Proposed Action Description: Funding will support development of an early stage prototype of a solid-state power inverter capable of converting low-voltage input power generated by utility-scale solar farms to medium voltage AC output power for transmission to the electric grid, increasing energy yield and reducing equipment costs. Proposed work consists of indoor laboratory-based research and development (R&D) and device testing, including (1) design, fabrication, and

73

Categorical Exclusion Determination Form Proposed Action Title: (0470-1532) Arcadia Biosciences, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32) Arcadia Biosciences, Inc. - 32) Arcadia Biosciences, Inc. - Vegetative Production of Oil in a C4 Crop Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Davis, CA Proposed Action Description: Funding will support development of genetically modified (GM) Setaria viridis (Setaria) that produces triacylglycerol (vegetable oil) in the tissues of I. the plant in place of starch. If the work performed under the award is successful, Arcadia will incorporate the gene combinations developed in _ Setaria into sorghum. Proposed work will consist of laboratory-based (1) genetic modification of E. coli to construct vectors for implementing oil production genes in Setaria; (2) genetic modification of Setaria to express gene combinations for three different pathways that are critical to oil synthesis; and (3)

74

Categorical Exclusion Determination Form Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97) Smart Wire Grid, Inc. - 97) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): California, Missouri, North Carolina, Georgia, Wash ington, Pennsylvania, and Tennessee Proposed Action Description: Funding will support development of a Smart Wire System Controller and an energy router software to enable distributed agents to coordinate with the control center, improve power flow control, and take advantage of unused capacity within the existing transmission system. In addition, the power controller will enable grid operators to optimize transmission assets to fully integrate variable renewable energy sources. Proposed work consists of (1) designing, developing, testing, and optimizing the Smart Wire System Controller to meet utility specifications; (2)

75

Categorical Exclusion Determination Form Proposed Action Title: (0674-1585) Xilectric, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

585) Xilectric, Inc. - 585) Xilectric, Inc. - Low Cost Transportation Batteries Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): University of Rhode Island (Kingston, RI); Electrosynthesis, Inc. (Lancaster, NY) Proposed Action Description: Submit by E-mail JI Funding will support efforts to develop a new class of low-cost rechargeable battery chemistries based on the Edison battery chemistry that have the potential to exceed energy densities of 400 Wh/kg and 600 Wh/L at a battery materials cost less than $50/kWh. These battery systems will be built from materials that are earth-abundant, environmentally friendly, and cheap with a cell architecture that is inexpensive to manufacture and electrode structures expected to have extremely long cycle life. Proposed work will consist of: (1) testing, thermodynamic characterization, and

76

Proposed Action Title: (0470-1517) Donald Danforth Plant Science Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(0470-1517) Donald Danforth Plant Science Center - (0470-1517) Donald Danforth Plant Science Center - Center for Enahnced Camelina Oil Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Michigan, Missouri, Montana, Nebraska, New Mexico Proposed Action Description: Funding will support development of genetically modified (GM) camelina that grows at an increased yield and produces more seed oil than wild- type camelina for use as a biofuel feedstock. Proposed work will consist of (1) genetically modifying camelina to improve carbon capturel assimilation and light utilization, and to redirect carbon flux towards seed oil synthesis, including synthesis of oleic acid; (2) fabricating and testing phenomics chambers used to analyze plant metabolism under varying conditions (e.g. humidity, temperature); (3) growing selected lines of non-GM, wild-type camelina in contained

77

Categorical Exclusion Determination Form Proposed Action Title: (0674-1610) TVN Systems, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

610) TVN Systems, Inc. - 610) TVN Systems, Inc. - Hydrogen/Bromine Electrical Energy Storage System Program or Field Office :Advanced Research Projects Agency - Energy (ARPA-E) Submit by E-mail LocationCs) CCity/County/State): TVN Systems, Inc. (Lawrence, KS); Vanderbilt University (Nashville, TN); University of Kansas (Lawrence, KS) Proposed Action Description: Funding will support efforts to develop a cost-effective hydrogen-bromine flow battery that utilizes advanced membrane materials, unique catalysts, a novel shunt current protection system , and advanced cell and system designs. Proposed work will consist of: (1) synthesizing active and stable Rhodium-sulfer based electro-catalytic materials for hydrogen reactions; (2) fabricating and testing nanofiber composite membranes;

78

M-area hazardous waste management facility groundwater monitoring and corrective-action report, First quarter 1995, Volume 1  

SciTech Connect

This report, in three volumes, describes the ground water monitoring and c corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during the fourth quarter 1994 and first quarter 1995. Concise description of the program and considerable data documenting the monitoring and remedial activities are included in the document. This is Volume 1 covering the following topics: sampling and results; hydrogeologic assessment; water quality assessment; effectiveness of the corrective-action program; corrective-action system operation and performance; monitoring and corrective-action program assessment; proposed monitoring and corrective-action program modifications. Also included are the following appendicies: A-standards; B-flagging criteria; C-figures; D-monitoring results tables; E-data quality/usability assessment.

NONE

1995-05-01T23:59:59.000Z

79

DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

80

A Sustainable Stormwater Management Proposal for a Bayfront Military Brownfield  

E-Print Network (OSTI)

sustainable on?site stormwater management techniques.   Although  not enforced like building codes, design 

Doyle, John

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Energy.gov (U.S. Department of Energy (DOE))

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

82

Categorical Exclusion Determination Form Proposed Action Title: (0472-1518) Case Western Reserve University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18) Case Western Reserve University - 18) Case Western Reserve University - Transformation Enabled Nitride Magnets Absent Rare Earths Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Cleveland, OH Proposed Action Description: Funding will support the development of iron nitride (a"-Fe16(xx)N2) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Case Western Reserve University's application was selected for an initial 18- month period (Phase 1) of funding . The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

83

Categorical Exclusion Determination Form Proposed Action Title: (0472-1545) Dartmouth College -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45) Dartmouth College - 45) Dartmouth College - Nanocrystalline T-MnAI Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Hanover, NH Proposed Action Description: Funding will support the development of manganese-aluminum (T-MnAI) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Dartmouth College's application was selected for an initial 18- month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional H3-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

84

Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 2 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES Some types of experiments are best (or only) performed deep underground. For this reason, scientists have considered WIPP as a potential site for these types of experiments and have sought permission from DOE to conduct several types of experiments there. As an example, astrophysicists are searching for very small particles with no charge called neutrinos. These particles are so small that they typically pass through the Earth. The only way to detect them is to look for them using facilities as far underground as possible so that the Earth's surface layers filter out other cosmic particles and radiation. The first basic astrophysics-like experiments were begun at WIPP in 1993 by LANL scientists who used

85

Categorical Exclusion Determination Form Proposed Action Title: (0472-1537) Northeastern University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37) Northeastern University - 37) Northeastern University - Multiscale Development of L 10 Materials for Rare-Earth-Free Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): New York, Michigan, Massachusetts, and Nebraska. Proposed Action Description: Funding will support the development of an ultra-strong ferromagnetic magnet material with a tetragonal L 10 structure, that does not contain rare earth materials and is designed for use in clean energy technologies such as electric vehicle motors and wind turbine generators. Northeastern University's application was selected for an initial 18-month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated

86

Federal Energy Management Program: Develop an Institutional Change Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change Continuous Improvement Cycle After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular measurement. Remember that planning useful efficiency and sustainability evaluation is necessary before an organization begins to implement an action plan.

87

BPA's proposed oversupply management protocol, Attachment P Narrative...  

NLE Websites -- All DOE Office Websites (Extended Search)

O N 1 Oversupply Management Protocol A. Background The Bonneville Power Administration ("BPA") operates the Federal Columbia River Power System ("FCRPS") as an integrated...

88

Notice of Office of Management and Budget Action to Approve with Change the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a New Collection for OE a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change as an emergency action for six months the Information Collection Request (ICR) for a new collection (Request for a new OMB Control Number) for OE Recovery Act Financial Assistance Grants. Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants More Documents & Publications Notice of Office of Management and Budget Action to Approve with Change the

89

European IPR Helpdesk IP Management in Horizon 2020: at the proposal stage  

E-Print Network (OSTI)

European IPR Helpdesk European IPR Helpdesk Fact Sheet IP Management in Horizon 2020: at the proposal stage The European IPR Helpdesk is managed by the European Commission's Executive Agency for Small

Robbiano, Lorenzo

90

PRESENTATION: OVERVIEW OF PROPOSED "DARPA-INSPIRED" APPROACH TO ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT  

Energy.gov (U.S. Department of Energy (DOE))

A briefing to the SEAB Task Force on Technology Development for Environmental Management (EM) on a proposed "DARPA-Inspired" approach to technology development for EM.

91

Economic and Hydrologic Implications of Proposed Edwards Aquifer Management Plans  

E-Print Network (OSTI)

, according to Texas water law, ground water is a property right vested with the land owner. Throughout at least the past two decades, attempts to negotiate voluntary management plans to restrict pumpage have been unsuccessful, even though demand is projected...

Dillon, Carl R.; Jones, Lonnie L.; Williams, R. Lynn; Jordan, Wayne R.; McCarl, Bruce A.

92

Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiments)  

SciTech Connect

The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is to take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPER project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.

Cooper, W.E.

2000-09-29T23:59:59.000Z

93

Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment)  

SciTech Connect

The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is to take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPER project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.

Cooper, W E

2000-12-05T23:59:59.000Z

94

Transcript of See Action and Technical Assistance Program Webinar: Strategic Energy Management  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) See Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

95

Notice of Office of Management and Budget Action to Approve with Change the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an Extension of the ICR an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension without Change of a Currently Approved Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants More Documents & Publications Notice of Office of Management and Budget Action to Approve with Change the

96

Implementing the Corrective Action Management Unit at Sandia National Laboratories, New Mexico  

SciTech Connect

In September 1997, following significant public and regulator interaction, Sandia Corporation (Sandia) was granted a Resource Conservation and Recovery Act (RCRA) and Hazardous Solid Waste Amendment (HSWA) permit modification allowing construction and operation of a Correction Action Management Unit (CAMU). The CAMU follows recent regulatory guidance that allows for cost-effective, expedient cleanup of contaminated sites and management of hazardous remediation wastes. The CAMU was designed to store, treat, and provide long-term management for Environmental Restoration (ER) derived wastes. The 154 square meter CAMU site at Sandia National Laboratories, New Mexico (SNL/NM), includes facilities for storing bulk soils and containerized wastes, for treatment of bulk soils, and has a containment cell for long-term disposition of waste. Proposed treatment operations include soil washing and low temperature thermal desorption. The first waste was accepted into the CAMU for temporary storage in January 1999. Construction at the CAMU was completed in March 1999, and baseline monitoring of the containment cell has commenced. At completion of operations the facility will be closed, the waste containment cell will be covered, and long-term post-closure monitoring will begin. Sandia's CAMU is the only such facility within the US Department of Energy (DOE) complex. Implementing this innovative approach to ER waste management has required successful coordination with community representatives, state and federal regulators, the DOE, Sandia corporate management, and contractors. It is expected that cost savings to taxpayers will be significant. The life-cycle CAMU project cost is currently projected to be approximately $12 million.

MOORE,DARLENE R.; SCHRADER,SCOTT A.; KING,GABRIEL G.; CORMIER,JOHN

2000-01-26T23:59:59.000Z

97

Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 31 Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program, Los Alamos, New Mexico September 2, 2003 Department of Energy National Nuclear Security Administration Los Alamos Site Office Environmental Assessment for the Proposed LANL Trails Management Program DOE LASO September 2, 2003 iii Contents Acronyms and Terms................................................................................................................................vii Executive Summary ...................................................................................................................................ix 1.0 Purpose and Need ..............................................................................................................................1

98

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/26/2010 2/26/2010 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: Tom Pyke FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 12/22/2009 ACTION REQUESTED: New collection (Request for a new OMB Control Number) TYPE OF REVIEW REQUESTED: Emergency ICR REFERENCE NUMBER: 200912-1910-010 AGENCY ICR TRACKING NUMBER: Jaime Carlson-OE TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 08/31/2010 DISCONTINUE DATE:

99

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9/30/2010 9/30/2010 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: William Turnbull FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 07/23/2010 ACTION REQUESTED: Extension without change of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201005-1910-005 AGENCY ICR TRACKING NUMBER: Matthew Grosso TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 12/31/2011 DISCONTINUE DATE:

100

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1/10/2012 1/10/2012 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: William Turnbull FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 10/13/2011 ACTION REQUESTED: Revision of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201110-1910-001 AGENCY ICR TRACKING NUMBER: Matthew Grosso TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 01/31/2015 DISCONTINUE DATE:

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri  

SciTech Connect

The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon-Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this time has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impacts associated with the proposed action.

MacDonell, M M; Peterson, J M

1989-05-01T23:59:59.000Z

102

DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposals for Management of New Mexico Waste Isolation Proposals for Management of New Mexico Waste Isolation Pilot Plant DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot Plant June 20, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati --The U.S. Department of Energy (DOE) today issued a Final Request for Proposal for management and operations of the Waste Isolation Pilot Plan (WIPP) located in Carlsbad, New Mexico. The successful contractor will manage the WIPP site and DOE's National Transuranic Waste (TRU) program. DOE anticipates awarding a competitive, cost-plus-award-fee contract with an approximate value of $135 million per year, for five years. There will be an option to extend the contract for five additional years. The overall mission of the WIPP and the National TRU program is to protect

103

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals Seeking a Contractor to Manage and Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility in Princeton, NJ. PPPL receives approximately $78 million annually from DOE. This is the first competition for a contractor in the history of the laboratory. The RFP describes the criteria DOE will use in selecting a successful future management and operating (M&O) contractor. Key criteria include:

104

Uranium mill tailings remedial action project real estate management plan  

SciTech Connect

This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

Not Available

1994-09-01T23:59:59.000Z

105

Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions  

Science Journals Connector (OSTI)

Transportation infrastructure life-cycle management deals with maintenance decision making of transportation facilities such as pavement, bridges, and railways under budget constraints. In practice, transportation agencies adopt threshold-based rules for maintenance planning because they are intuitive and easy to implement. However, the thresholds are often determined based on engineering judgment without any systematic approach. Therefore, maintenance budgets cannot be used effectively and facility conditions are not optimized. This research uses hybrid dynamic models to represent threshold-based maintenance for transportation infrastructure in a realistic manner. Hybrid dynamic models combine continuous states such as pavement roughness and age with discrete states such as maintenance history. These models are also capable of considering multiple maintenance actions with heterogeneous effects. Based on facility conditions and maintenance thresholds, corresponding maintenance actions are selected automatically and the facility switches between deterioration modes to reflect the effects of the chosen action. Furthermore, to consider users’ reactions to maintenance actions and accurately predict deterioration for a network of facilities, threshold-based maintenance is formulated as an upper-level problem, and user response is incorporated as a lower-level problem. This leads to a bi-level programming problem where maintenance thresholds are decision variables, which is solved with a modified tabu search algorithm. The proposed methodology is validated with the road network of an urban area and the generated maintenance thresholds are reasonable and robust, which shows that the methodology has great potential to support transportation infrastructure life-cycle management in practice.

James C. Chu; Yin-Jay Chen

2012-01-01T23:59:59.000Z

106

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Request for Proposals Seeking a Contractor to Manage and DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National Accelerator Laboratory (Fermilab). Fermilab is a major DOE Office of Science single program research facility located on 6,800 acres approximately 45 miles west of Chicago, Illinois. "Fermilab is a world leader in high energy physics, which helps the U.S.

107

As Sequences Flow: Proposal of Organizational Rules for `Lean Construction'Management Proceedings IGLC-7 399  

E-Print Network (OSTI)

and efficiency, unless new organizational strategies are developed. On one hand, these must be capableAs Sequences Flow: Proposal of Organizational Rules for `Lean Construction'Management Proceedings IGLC-7 399 AS SEQUENCES FLOW: PROPOSAL OF ORGANIZATIONAL RULES FOR `LEAN CONSTRUCTION

Tommelein, Iris D.

108

Metastructuration actions of management: critical for stakeholder intervention in IS/IT implementations  

Science Journals Connector (OSTI)

Metastructuration actions (overarching activities from management that shape and align users' activities of IS/IT use) are often advocated to improve the success of IS/IT implementation. But how can management support enhance the success of IS/IT by metastructuration actions, when they are dealing with multiple stakeholders? This key question is addressed in this paper. Building on Orlikowski et al. (1995), we explore the contextual conditions of metastructuration actions of management concerning three other key stakeholders: users, the IT department, and external service providers or consultants. The empirical case context is a Dutch public healthcare organisation that deployed three (different) departmental information systems. Based on 26 interviews with all stakeholders that were involved in the deployment of the three departmental information systems, we find that three types of metastructuration actions were critical in a particular relationship with two types of stakeholders. We conclude that this demonstrates that stakeholder context is indeed conditional to metastructuration actions, and hence the success of an IS/IT implementation in terms of perceived system quality and acceptance.

Benny M.E. De Waal; Ronald Batenburg; Ben Fruytier

2012-01-01T23:59:59.000Z

109

Action  

National Nuclear Security Administration (NNSA)

and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http: www,nrc.govreading-rmadams.htmI. Persons who do not have access to...

110

Surveillance Guide - MSS 1.1 Corrective Action/Issue Management and Continuous Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CORRECTIVE ACTION/ISSUE MANAGEMENT & CONTINUOUS IMPROVMENT CORRECTIVE ACTION/ISSUE MANAGEMENT & CONTINUOUS IMPROVMENT 1.0 Objective The objective of this surveillance is to verify that contractor personnel are effectively managing environment, safety, and health issues. The activities included in this surveillance help the Facility Representative determine whether safety issues identified through internal contractor, and external DOE or Defense Nuclear Facilities Safety Board evaluation programs are resolved consistent with the level of safety importance. It further verifies continuous improvement programs are in place and functional. 2.0 References 2.1 10 CFR 830.120, Quality Assurance Requirements 2.2 DOE O 414.1A, Quality Assurance 2.3 DOE O 232.1A, Occurrence Reporting and Processing of Operations Information

111

Notice of Proposed Floodplain and Wetlands Actions (DOE/EIS-0385) (03/28/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

398 Federal Register 398 Federal Register / Vol. 71, No. 59 / Tuesday, March 28, 2006 / Notices conditions that could result in an accidental or unauthorized detonation of nuclear explosives. Comments are invited on: (a) Whether the extended collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques

112

Demand side management in smart grid: A review and proposals for future direction  

Science Journals Connector (OSTI)

Abstract This paper mainly focuses on demand side management and demand response, including drivers and benefits, shiftable load scheduling methods and peak shaving techniques. Demand side management techniques found in literature are overviewed and a novel electricity demand control technique using real-time pricing is proposed. Currently users have no means to change their power consumption to benefit the whole system. The proposed method consists of modern system identification and control that would enable user side load control. This would potentially balance demand side with supply side more effectively and would also reduce peak demand and make the whole system more efficient.

Linas Gelazanskas; Kelum A.A. Gamage

2014-01-01T23:59:59.000Z

113

EMSL Research and Capability Development Proposals Facility-Wide Management and Storage for Scientific Data  

E-Print Network (OSTI)

EMSL Research and Capability Development Proposals Facility-Wide Management and Storage become an increasingly important challenge in science. In many small- to medium-scale laboratory and methodologies employed to produce them. These approaches are tractable up to a certain limit--as long

114

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office of Science multi-program research facility located near Chicago, Illinois. "Argonne lab contributes expert scientists and unique leadership in basic research, which helps the U.S. maintain our global competitiveness," said Office of Science Director, Dr. Raymond L. Orbach. "Through this contracting process, DOE seeks the best possible management of this

115

Finding of no significant impact for the interim action for cleanup of Pit 9 at the Radioactive Waste Management Complex, Idaho National Engineering Laboratory  

SciTech Connect

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0854, for an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The proposed action would be conducted at Pit 9, Operable Unit 7--10, located at the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). The proposed action consists of construction of retrieval and processing buildings, excavation and retrieval of wastes from Pit 9, selective physical separation and chemical extraction, and stabilization of wastes either through thermal processing or by forming a stabilized concentrate. The proposed action would involve limited waste treatment process testing and full-scale waste treatment processing for cleaning up pre-1970 Transuranic (TRU) wastes in Pit 9. The purpose of this interim action is to expedite the overall cleanup at the RWMC and to reduce the risks associated with potential migration of Pit 9 wastes to the Snake River Plain Aquifer.

Not Available

1993-10-01T23:59:59.000Z

116

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

its Ames Laboratory its Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory June 29, 2006 - 2:48pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames Laboratory, a DOE Office of Science (SC) research facility in Ames, Iowa. This competition for a contractor is the first in the history of the laboratory. Ames is a laboratory that has been funded at approximately $30 million annually by the Office of Science, other government agencies, and private industry. "Ames Laboratory provides leadership in basic research across a broad spectrum of science, with great expertise in biology, chemistry, physics

117

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fermi National Accelerator Laboratory Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National Accelerator Laboratory (Fermilab). Fermilab is a major DOE Office of Science single program research facility located on 6,800 acres approximately 45 miles west of Chicago, Illinois. "Fermilab is a world leader in high energy physics, which helps the U.S. maintain global competitiveness," said Under Secretary for Science, Dr.

118

M-Area Hazardous Waste Management Facility groundwater monitoring and corrective-action report. Second quarter 1995, Volume 1  

SciTech Connect

This report describes the corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site during second quarter 1995. Topics include: changes in sampling, analysis, and reporting; water levels; remedial action of groundwater; and hydrology of the affected aquifer zones.

NONE

1995-08-01T23:59:59.000Z

119

An overview of the corrective action management unit and temporary unit regulations  

SciTech Connect

In February 1993, the US Environmental Protection Agency (EPA) promulgated the corrective action management unit (CAMU) and temporary unit (TU) regulations as 40 CFR Part 264, Subpart S. These regulations are intended to foster the selection of protective and cost-effective remedies for the restoration of sites contaminated by hazardous substances, hazardous wastes, and hazardous waste constituents by removing certain regulatory impediments to implementing those remedies, most notably those of the land disposal restrictions (LDRs). This paper provides a brief overview of the CAMU and TU regulations.

Green, D.R. [Argonne National Lab., IL (United States); Corathers, L. [Pacific Northwest Lab., Richland, WA (United States); Coalgate, J. [USDOE, Washington, DC (United States)

1995-03-01T23:59:59.000Z

120

Assessment of trace metals during episodic events using DGT passive sampler: A proposal for water management enhancement  

E-Print Network (OSTI)

in "Water Resources Management 27, 12 (2013) 4163-4181" DOI : 10.1007/s11269-013-0401-5 #12;Abstract disturbance (dredging) and provide proposal for a better water management. The results indicate that: (1) DGT of metals from the lake to the estuary; and (4) at the confluence of the Marikina River water management

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Request for Proposals for the Hulka Energy Research Fellowships managed by the University of Maryland Energy Research Center  

E-Print Network (OSTI)

energy, · ocean thermal or wave energy or geothermal energy conversion. The proposed research mustRequest for Proposals for the Hulka Energy Research Fellowships managed by the University of Maryland Energy Research Center Announcement Date: November 15, 2011 Proposal Due Date: December 12, 2011

Rubloff, Gary W.

122

DRAFT FOR SECRETARIAL REVIEW Proposed Amendment 94 to the Fishery Management Plan for Groundfish of the Bering Sea  

E-Print Network (OSTI)

DRAFT FOR SECRETARIAL REVIEW Proposed Amendment 94 to the Fishery Management Plan for Groundfish Impact Review/ Initial Regulatory Flexibility Analysis April 2010 Lead Agency: National Marine Fisheries Abstract: This Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis

123

Alternatives for management of wastes generated by the formerly utilized sites remedial action program and supplement  

SciTech Connect

Alternatives for disposal or stabilization of the wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP) are identified and compared, with emphasis on the long-term aspects. These wastes consist of soil material and rubble containing trace amounts of radionuclides. A detailed pathway analysis for the dose to the maximally exposed individual is carried out using an adaptation of the natural analogue method. Comparisons of the different alternatives, based on the results of the pathway analysis and qualitative cost considerations, indicate that, if the hazard is such that the wastes must be removed and disposed of rather than stabilized in place, disposal by immediate dispersal is preferable to containment, and containment followed by slow planned dispersal is preferable to containment without dispersal. The Supplement presents refinements of work that was reported at the 1982 International Decommissioning Symposium. The new material consists of revisions of the estimates of the predicted potential dose to the maximally exposed individual and a more detailed comparative assessment of the radiological impacts of alternatives for management of wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP).

Gilbert, T.L.; Peterson, J.M.; Vocke, R.W.; Alexander, J.K.

1983-03-01T23:59:59.000Z

124

Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that  

E-Print Network (OSTI)

Data Management Plan (outline) The Data Management Plan (DMP to the funder's Data Policy and (2) how the investigator plans to manage the data should cover the following topics: 1. Information about the data · Describe

125

Emergence of collective action and environmental networking in relation to radioactive waste management  

SciTech Connect

This paper explores the relationship between the national environmental movement and nuclear technology in relation to a local emergent group. The historical development of nuclear technology in this conutry has followed a path leading to continued fear and mistrust of waste management by a portion of the population. At the forefront of opposition to nuclear technology are people and groups endorsing environmental values. Because of the antinuclear attitudes of environmentalists and the value orientation of appropriate technologists in the national environmental movement, it seems appropriate for local groups to call on these national groups for assistance regarding nuclear-related issues. A case study is used to illustrate how a local action group, once integrated into a national environmental network, can become an effective, legitimate participant in social change. The formation, emergence, mobilization, and networking of a local group opposed to a specific federal radioactive waste management plan is described based on organizational literature. However, inherent contradictions in defining the local versus national benefits plus inherent problems within the environmental movement could be acting to limit the effectiveness of such networks. 49 refs.

Williams, R.G.; Payne, B.A.

1985-01-01T23:59:59.000Z

126

Records Management in the Formerly Used Sites Remedial Action Program (FUSRAP)  

SciTech Connect

The U.S. Army Corps of Engineers' (USACE's) performance of site investigation and remediation under the Formerly Used Sites Remedial Action Program (FUSRAP) requires the use of a records management system in order to effectively capture and manage data, document the decision making process, and allow communication of project information to regulators, congress, and the public. The USACE faces many challenges in managing the vast amount of data, correspondence, and reports generated under this program, including: management of data and reports in a variety of paper, electronic, and microfilm formats; incorporation of records generated by the Department of Energy (DOE) prior to 1997; ensuring smooth flow of information among numerous internal Project Managers and regulators; and facilitating public access to information through the development of CERCLA Administrative Records and response to Freedom of Information Act (FOIA) requests. In 2004-2005, the USACE Buffalo District contracted with Dynamac Corporation to adapt the records management system developed for the Formerly Used Defense Sites (FUDS) Program to the records for the Luckey and Painesville FUSRAP sites. The system, known as the FUDS Information Improvement Plan (FIIP), was jointly developed by the USACE Hazardous, Toxic, and Radioactive Waste Center of Expertise (HTRW-CX), USACE Rock Island District, and several FUDS contractors (including Dynamac Corporation) in 2003. The primary components of the FIIP which address the challenges faced by the FUSRAP Program include: the development of a standardized document organization system; the standardization of electronic conversion processes; the standardization of file naming conventions; and the development of an automated data capture system to speed the process and reduce errors in indexing. The document organization system allows for the assignment of each individual document to one of approximately 150 categories. The categories are based upon a combination of the USACE site approval process and the CERCLA process. Documents are assigned to categories based on their relevance to the approval of the site, historical or reference content, and generation during a phase of the investigation and remediation process. Within each category relevant to a CERCLA phase, sub-categories exist to allow for the organization of correspondence, data, work plans, contracting information, technical reports, decision documents, and other associated documentation. The electronic conversion system was developed by USACE to standardize the types of electronic files maintained on the USACE Project Information Retrieval System (PIRS). Prior to standardization, PIRS had been populated with hundreds of thousands of electronic files of various incompatible types, making systematic search and retrieval impossible. By dictating the use of PDF files with standardized specifications, USACE ensured that all files were in the same format, and that the format is universally searchable and retrievable by probable users of the system. Similarly, the implementation of standardized file names, based on a combination of the site name, organization category, and a unique sequence number, facilitates linking of the individual files to indexing and search functions. To automate the entire process, Dynamac developed a Document Management Database, which was adapted to the FUSRAP Program for the Luckey and Painesville sites. Prior to the use of a database, capture of document titles, authors, dates, organization category, and other information was done manually, taking substantial time and leading to numerous errors. The database, developed in Microsoft Access format, facilitates the speed of the data entry and reduces errors by building drop-down menus during the data entry process. For instance, once an author and their affiliation are entered once, the name and affiliation can be retrieved by entering the beginning of the character string, or choosing the name from the drop-down list. For projects involving the management of tens of thousands of docum

Morekas, G.N.; Pape, M.B. [Dynamac Corporation, 2275 Research Boulevard, Suite 300, Rockville, MD 20850 (United States)

2006-07-01T23:59:59.000Z

127

1999 Annual Mixed Waste Management Facility Groundwater Correction - Action Report (Volumes I, II, and III)  

SciTech Connect

This Corrective Action Report (CAR) for the Mixed Waste Management Facility (MWMF) is being prepared to comply with the Resource Conservation and Recovery Act (RCRA) Permit Number SC1 890 008 989, dated October 31, 1999. This CAR compiles and presents all groundwater sampling and monitoring activities that are conducted at the MWMF. As set forth in previous agreements with South Carolina Department of Health and Environmental Control (SCDHEC), all groundwater associated with the Burial Ground Complex (BGC) (comprised of the MWMF, Low-Level Radioactive Waste Disposal Facility, and Old Radioactive Waste Burial Ground) will be addressed under this RCRA Permit. This CAR is the first to be written for the MWMF and presents monitoring activities and results as an outcome of Interim Status and limited Permitted Status activities. All 1999 groundwater monitoring activities were conducted while the MWMF was operated during Interim Status. Changes to the groundwater monitoring program were made upon receipt of the RCRA Permit, where feasible. During 1999, 152 single-screened and six multi-screened groundwater monitoring wells at the BGC monitored groundwater quality in the uppermost aquifer as required by the South Carolina Hazardous Waste Management Regulations (SCHWMR), settlement agreements 87-52-SW and 91-51-SW, and RCRA Permit SC1 890 008 989. However, overall compliance with the recently issued RCRA Permit could not be implemented until the year 2000 due to the effective date of the RCRA Permit and scheduling of groundwater monitoring activities. Changes have been made to the groundwater monitoring network to meet Permit requirements for all 2000 sampling events.

Chase, J.

2000-06-14T23:59:59.000Z

128

Integrating local action elements for action analysis  

Science Journals Connector (OSTI)

In this paper, we propose a framework for human action analysis from video footage. A video action sequence in our perspective is a dynamic structure of sparse local spatial-temporal patches termed action elements, so the problems of action analysis ... Keywords: Action classification, Action distance function, Action matching, Action retrieval, Generalized Hough Transform, Implicit Shape Model, Multi-dimensional density estimation, Sparse Bayesian classifier, Spatial temporal feature

Tuan Hue Thi; Li Cheng; Jian Zhang; Li Wang; Shinichi Satoh

2012-03-01T23:59:59.000Z

129

Corrective action management unit application for the Environmental Restoration Disposal Facility  

SciTech Connect

The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

Evans, G.C.

1994-06-01T23:59:59.000Z

130

GAO-05-123 Department of Energy: Further Actions Are Needed to Strengthen Contract Management for Major Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Committee on Government Committee on Government Reform, House of Representatives March 2005 DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects GAO-05-123 www.gao.gov/cgi-bin/getrpt? GAO-05-123. . To view the full product, including the scope and methodology, click on the link above. For more information, contact Robin Nazzaro at (202) 512-3841 or nazzaror@gao.gov. Highlights of GAO-05-123, a report to the Committee on Government Reform, House of Representatives March 2005 DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects The Department of Energy (DOE) pays its contractors billions of dollars each year to implement its major projects-those costing more than $400 million each. Many

131

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

132

U.S. Department of Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Office of Legacy Management Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012 This report serves as an official record of the annual cost, personnel, and performance information for the Office of Legacy Management to satisfy the post competition accountability requirements. Reporting Period: Fiscal Years (FY) 2012 - 2016 FY2013 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability.* Annual   2. Publish Post Competition Accountability Report on the LM internet. Quarterly   3. Conduct independent evaluations of key programs, projects, or technical issues by goal

133

Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal  

SciTech Connect

This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

Not Available

1994-01-01T23:59:59.000Z

134

M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities groundwater monitoring and corrective-action report (U). Third and fourth quarters 1996, Vol. I  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River Site (SRS) during 1996.

NONE

1997-03-01T23:59:59.000Z

135

Audit of Proposal to Acquire Land at the Fernald Environmental Management Project, ER-B-97-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Inspector General AUDIT OF PROPOSAL TO ACQUIRE LAND AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

136

Final Environmental Impact Statement for the Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement for the Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment DOE/EIS - 0440 Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management, Yuma Field Office U.S. Army Corps of Engineers U.S. Army Garrison Yuma Proving Ground Arizona Department of Environmental Quality Arizona Game and Fish Department December 2012 COVER SHEET Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management U.S. Army Corps of Engineers U.S. Army Garrison-Yuma Proving Ground Arizona Department of Environmental Quality

137

MSS 1.1 Corrective Action/Issue Management 4/13/2000  

Energy.gov (U.S. Department of Energy (DOE))

The objective of this surveillance is to verify that contractor personnel are effectively managing environment, safety, and health issues.  The activities included in this surveillance help the...

138

EMSL Research and Capability Development Proposals Facility-Wide Management and Storage for Scientific Data  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility-Wide Management and Storage for Scientific Data Facility-Wide Management and Storage for Scientific Data Project Start Date: Summer 2008 EMSL Lead Investigator Ken Auberry Instrumentation Development Laboratory, EMSL, PNNL As greater numbers of collaborators, journals, and funding agencies require data retention associated with a given project, preservation of experimentally generated results has become an increasingly important challenge in science. In many small- to medium-scale laboratory environments, this task has traditionally been carried out using offline optical media (recordable CDs and DVDs) or externally connected commercial hard drive units. Along with the raw storage issues that must be addressed, additional challenges await in the correlation of stored data to contextual information about the experiments and

139

About QNRF Newsroom Funding Programs Activities Awarded Proposals Grant Management Contact Us Site Search  

E-Print Network (OSTI)

suitable for use in SHM of oil/gas pipelines and offshore platforms in Qatar. ID : 1271 Number of shows: 31 Proposal Specialty: 2.10 Nano Technology LPI Name: Prof. Shaker Meguid Submitting Institution: Qatar 800 pixels for screen resolution © 2008 - 2010 QNRF - Qatar National Research Fund English First

Sun, Yu

140

Lessons learned -- a comparison of the proposed on-site waste management facilities at the various Department of Energy sites  

SciTech Connect

The Department of Energy Sites (DOE) are faced with the challenge of managing several categories of waste generated from past or future cleanup activities, such as 11(e)2 byproduct material, low-level radioactive (LL), low-level radioactive mixed (LLM), transuranic (TRU), high level radioactive (HL), and hazardous waste (HW). DOE must ensure safe and efficient management of these wastes while complying with all applicable federal and state laws. Proposed waste management strategies for the EM-40 Environmental Restoration (ER) program at these sites indicate that on-site disposal is becoming a viable option. For purposes of this paper, on-site disposal cells managed by the EM-40 program at Hanford, Weldon Spring, Fernald Environmental Management Project (FEMP) and Rocky Flats were compared. Programmatic aspects and design features were evaluated to determine what comparisons can be made, and to identify benefits lessons learned that may be applicable to other sites. Based on comparative analysis, it can be concluded that the DOE EM-40 disposal cells are very unique. Stakeholders played a major role in the decision to locate the various DOE on-site disposal facilities. The disposal cells will be used to manage 11(e)2 by-product materials, LL, LLM, and/or HLW. The analysis further suggests that the design criteria are comparable. Lessons learned relative to the public involvement activities at Weldon Spring, and the design approach at Hanford should be considered when planning future on-site disposal facilities at DOE sites. Further, a detailed analysis of progress made at Hanford should be evaluated for application at sites such as Rocky Flats that are currently planning on-site disposal facilities.

Ciocco, J. [Dept. of Energy, Germantown, MD (United States); Singh, D. [Booz Allen and Hamilton, Germantown, MD (United States); Survochak, S. [DOE RFETS, Golden, CO (United States); Elo, M. [Burns and Roe, Germantown, MD (United States)

1996-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

From rhetoric to knowledge based actions – Challenges for outdoor recreation management in Sweden  

Science Journals Connector (OSTI)

Abstract This paper investigates how outdoor recreation is considered in the context of strong biodiversity conservation ambitions, and discusses the challenges associated with outdoor recreation management in two protected areas in Sweden. The research employs qualitative techniques such as interviews with key actors and examinations of documents. The results show that while the two planning processes show a sincere engagement and effort spent on outdoor recreation management, no clear strategies for or systematic treatment of outdoor recreation became apparent. Worse, clear deficits in knowledge and relevant competences have been identified, and generally available scientific knowledge about outdoor recreation has not been utilized. Concerns of outdoor recreation are typically addressed by biologists, instead of professionals with training in any of the social sciences or planning disciplines. Apparently these fundamental deficiencies with regards to outdoor recreation can only be improved if it is recognized as a land use interest in its own right. In order to improve management and planning processes, outdoor recreation needs to be institutionalized, and receive its own management guidelines and formal process agendas. Management implications The consideration of outdoor recreation in Sweden’s landscapes and protected areas lacks behind international standards. Currently it is not considered as a separate land use or planning objective, and modern recreational benefits of provision for health and wellbeing and the high esteem of outdoor recreation by the general population are ignored. Improvements would require a professional implementation process which should consider: – Area specific databases on outdoor recreation activities, including their spatial distribution; – A dedicated training and education in outdoor recreation planning and management (instead of it being an additional task for ecologically trained managers); – A strengthening of outdoor recreation research; – The mandated development and implementation of outdoor recreation related guidelines and monitoring plans; and – The development of specific frameworks sensitive to various ecological conditions (e.g. water based landscapes or forests).

Marie Stenseke; Anderas S. Hansen

2014-01-01T23:59:59.000Z

142

Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis for Proposed Amendment 86 to the Fishery Management Plan for Groundfish of the Bering  

E-Print Network (OSTI)

Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis......................................................................................................................................... 1 2 Regulatory Impact Review for Proposed Amendment 86 to the Fishery Management Plan for Groundfish of the Bering sea/Aleutian Islands

143

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60-DAY Federal Register Notice - Proposed 60-DAY Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the

144

Proposal for a Data Management API within the GridRPC Y. Caniou, E. Caron, F. Desprez, G. Le Mahec, H. Nakada and Y. Tanimura  

E-Print Network (OSTI)

Proposal for a Data Management API within the GridRPC Y. Caniou, E. Caron, F. Desprez, G. Le Mahec.92:2010-03-21) provides a recommendation to the Grid community on a proposed model and API for data management to Grid This document follows the document produced by the GridRPC-WG on GridRPC Model and API for End-User applications

Caniou, Yves

145

Climate change action plan  

E-Print Network (OSTI)

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

146

Record of Decision for Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Federal Register / Vol. 60, No. 4 / Friday, January 6, 1995 / Notices research and advanced concepts pertinent to fossil resource conversion and utilization limited to the nine (9) technical topics listed below. Topic 1-Advanced Environmental Control Technology for Coal Grant applications in support of Advanced Environmental Control Technology for Coal are only solicited for the following subtopics: Coal Preparation Hot Gas Stream Cleanup Advanced High Efficiency Emissions Control Waste Management Topic 2-Advanced Coal Utilization Grant applications in support of Advanced Coal Utilization are only solicited for the following subtopics: Advanced Coal Combustion Systems Fluid Bed Combustion (FBC) Topic 3-Coal Liquefaction Technology Grant applications in support of Coal Liquefaction Technology are only

147

Action Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

148

A successful effort to involve stakeholders in the selection of a site for a corrective action management unit  

SciTech Connect

As part of the effort to clean up hazardous waste sites, Sandia National Laboratories in New Mexico (SNL/NM) adopted a novel approach to involving stakeholders in a key decision associated with its Environmental Restoration (ER) Project. The decision was where to locate a Corrective Action Management Unit (CAMU), an area designed to consolidate, store, and treat wastes generated from cleanup activities. The decision-making approach was a variation of a technique known as multiattribute utility analysis (MUA). Although MUA has rarely been undertaken during normal Project activities, it proved to be a surprisingly effective means for involving stakeholders in the decision process, generating consensus over a selected site, and enhancing public trust and understanding of Project activities. Requirements and criteria for selecting CAMU sites are provided by the Environmental Protection Agency`s (EPA`s) CAMU Final Rule (EPA 1993). Recognizing the lack of experience with the Rule and the importance of community understanding and support, the ER Project sought an approach that would allow stakeholders to participate in the site-selection process.

Conway, R. [Sandia National Labs., Albuquerque, NM (United States); Merkhofer, M.W. [Applied Decision Analysis, Inc., Menlo Park, CA (United States); Oms, E. [USDOE Albuquerque, New Mexico (United State). Kirtland Area Office

1995-12-01T23:59:59.000Z

149

M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwate Monitoring and Corrective-Action Report, First and Second Quarters 1998, Volumes I, II, & III  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah river Site (SRS) during first and second quarters 1998. This program is required by South Carolina Hazardous Waste Permit SC1-890-008-989 and Section 264.100(g) of the South Carolina Hazardous Waste Management Regulations. Report requirements are described in the 1995 RCRA Renewal Permit, effective October 5, 1995, Section IIIB.H.11.b for the M-Area HWMF and Section IIIG.H.11.b for the Met Lab HWMF.

Chase, J.

1998-10-30T23:59:59.000Z

150

Waste management plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

This waste management plan defines the procedures for control and management of waste generated as a result of the removal action of the YS-86O Firing Ranges site at the Oak Ridge Y-12 Plant. This document includes plan objectives; remediation activities; key personnel; waste generation activities; and waste treatment, storage, transportation, and disposal. Methods of control and characterization of waste generated as a result of remediation activities will be within the guidelines and procedures outlined herein. ENTECH personnel will make every effort when conducting remediation and decontamination activities to minimize the amount of generated waste.

NONE

1998-03-01T23:59:59.000Z

151

Management Alert - The 2020 Vision One System Proposal for Commissioning and Startup of the Waste Treatment and Immobilization Plant, IG-0871  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The 2020 Vision One System Proposal The 2020 Vision One System Proposal for Commissioning and Startup of the Waste Treatment and Immobilization Plant DOE/IG-0871 October 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 October 3, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Management Alert on "The 2020 Vision One System Proposal for Commissioning and Startup of the Waste Treatment and Immobilization Plant" IMMEDIATE CONCERN The Department of Energy is considering a proposal known at the 2020 Vision One System (2020 Vision) that would implement a phased approach to commissioning the $12.2 billion Waste Treatment and Immobilization Plant (WTP). As part of the phased approach, the Low-

152

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of

153

BS.l Actions to Conserve Energy-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BS.l Actions to Conserve Energy- BS.l Actions to Conserve Energy- Revision 0 Sitewide Categorical Exclusion for Actions to Conserve Energy Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office L11tegrated Management System Procedure, NEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

154

A U.S. Department of Energy laboratory managed by The University of Chicago ATLAS Call for Proposals  

E-Print Network (OSTI)

-energy and reaccelerated CARIBU beams available on target for the November 2013 PAC (posted at http://www.phy.anl.gov/atlas/facility and the instrumentation can be accommodated properly. Guy Savard Scientific Director of the ATLAS Facility PhysicsA U.S. Department of Energy laboratory managed by The University of Chicago ATLAS Call

Kemner, Ken

155

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

156

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

157

Corrective Action Program Guide  

Directives, Delegations, and Requirements

This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

2006-03-02T23:59:59.000Z

158

A New Framework for Adaptive Sampling and Analysis During Long-Term Monitoring and Remedial Action Management  

SciTech Connect

DOE and other Federal agencies are making a significant investment in the development of field analytical techniques, nonintrusive technologies, and sensor technologies that will have a profound impact on the way environmental monitoring is conducted. Monitoring and performance evaluation networks will likely be base on suites of in situ sensors, with physical sampling playing a much more limited role. Designing and using these types of networks effectively will require development of a new paradigm for sampling and analysis of remedial actions, which is the overall goal of this project.

Minsker, Barbara; Albert Valocchi; Barbara Bailey

2008-01-27T23:59:59.000Z

159

Implementation Proposal for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

160

EA-1755: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1755: Mitigation Action Plan Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico EA prepared for the proposed reconstruction of the Waste Isolation Pilot Plant (WIPP) South Access Road (County Road 802) located in Eddy County, New Mexico. Through the environmental review process, the Bureau of Land Management Carlsbad Field Office (BLM CFO) determined that there would be potential environmental impacts from the proposed project that would require mitigation to assure that the impacts would not become significant. Therefore, the Department of Energy Carlsbad Field Office (CBFO) prepared this Mitigation Action Plan (MAP) to establish conditions for issuing its

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.).  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COALITION, COALITION, INFORMATION NETWORK FOR RESPONSIBLE MINING, CENTER FOR NATIVE ECOSYSTEMS, CENTER FOR BIOLOGICAL DIVERSITY, and SHEEP MOUNTAIN ALLIANCE, Plaintiffs, v. OFFICE OF LEGACY MANAGEMENT, and UNITED STATES DEPARTMENT OF ENERGY, Defendants. ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS' MOTION FOR RECONSIDERATION This matter is before the Court on Defendants' Motion to Reopen and for Reconsideration of October 18, 2011 Order. (ECF No. 95.) Plaintiffs have filed a Response to the Motion (ECF No. 100), and Defendants have filed a Reply (ECF No. 101). The Court hereby REOPENS this action for the limited purpose of ruling on Defendants' Motion for Reconsideration. See D.C.COLO.LCivR 41.2. Having carefully considered the arguments presented, Defendants' Motion for Reconsideration is

162

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will take place at Varentec Inc. (San Jose, CA), Georgia Tech University (Atlanta, GA), Electric Power Research Institute (Knoxville, TN), and Waukesha Electric Systems Inc....

163

Chapter 2 Proposed Action and Alternatives  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

capabilities at other laboratories. NREL would also improve its high-performance computing capability with space for high- Final EA Page 2-18 July 2003 Site-Wide...

164

41047Federal Register / Vol. 72, No. 143 / Thursday, July 26, 2007 / Proposed Rules Comments received by September 24,  

E-Print Network (OSTI)

Environmental Assessment (EA) and preliminary Regulatory Impact Review (RIR), for review by the Secretary), Commerce. ACTION: Notice of availability of proposed fishery management plan amendment; request (Councils) have submitted an Omnibus Amendment to the Fishery Management Plans (FMPs) of the Northeast

165

Corrective and Preventive Action  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Corrective/Preventive Action Process Document Number: P-008 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): P-004 Business System Management Review, F-017 Corrective Action Report Planning Worksheet or F-018 Preventive Action Report Planning Worksheet P-008 Corrective/Preventive Action Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change A Initial Release 08_0310 Implemented Multiple reviewer of "Root Cause" into process. 08_0313 Changed verbiage in Process, Responsibility and Definitions for clarification. Assigned new Backup Document Owner.

166

Nutrient Management Advisory Board ~ Approved ~  

E-Print Network (OSTI)

shared some of the proposed changes to the Odor Site Index, Standard Plan, and BMP reference list as individuals representing commercial Ag were in attendance. 2.) Review and Action of July 28, 2011 NMAB Meeting community how to use the MMM, and how to write Manure Management Plans (MMPs). DEP has made mini

Guiltinan, Mark

167

INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT  

SciTech Connect

The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

2011-05-31T23:59:59.000Z

168

Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee  

SciTech Connect

The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge.

NONE

1996-08-01T23:59:59.000Z

169

1Q/2Q00 M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwater Monitoring and Corrective-Action Report - First and Second Quarters 2000 - Volumes I, II, and II  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River site (SRS) during first and second quarters of 2000.

Chase, J.

2000-10-24T23:59:59.000Z

170

POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for...  

Energy Savers (EERE)

15 Processing Personnel Actions for Details POLICY GUIDANCE MEMORANDUM 15 Processing Personnel Actions for Details The Office of Personnel Management (OPM), effective September...

171

Corrective Action Tracking System User's Guide | Department of...  

Office of Environmental Management (EM)

September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP)...

172

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

173

Standards Actions, May 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-2001 30-2001 Activity Summary In Conversion - 4 In Preparation - 39 Out for Comment - 19 Published this Month - 0 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 23 Cancellation Pending - 9 Cancellation in Progress - 18 No Current Action - 12 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Proposed for Reaffirmation 1 Proposed Cancellation of DOE Technical Standards 2 Published DOE Technical Standards 3 American National Standards Institute 3 American National Standards 6 American Society for Testing and Materials 6 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. May 2001 Standards Actions DOE Technical Standards Projects Initiated

174

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

SciTech Connect

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

175

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

176

DOE/EIS-0265-SA-165: Supplement Analysis for the Watershed Management Program EIS (8/4/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-165) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-165) Mickey Carter TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 4.12 Filter Strips, 6.1 Differed Grazing, 6.10 Access Fencing Location: Custer County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

177

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 12, 2001 July 12, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57) Allyn Meuleman - KEWU Fish and Wildlife Project Manager Proposed Action: Idaho Fish Screening Improvement (Champion, Iron, Fourth of July, Goat Creeks) Project No: 1994-015-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish passage enhancement - fishways; 4.25 Consolidate/Replace irrigation diversion dams; 4.10 Water Conveyance: pipeline. Location: Stanley, Custer County, Idaho. Proposed by: Bonneville Power Administration (BPA) and the Idaho Department of Fish and Game. Description of the Proposed Action: BPA proposes to fund a project that will enhance in-stream

178

EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Proposed Changes to Parcel ED-1 Land Uses, Utility 6: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee SUMMARY NOTE: This EA has been cancelled. This EA will evaluate the environmental impacts of DOE's proposed modifications to the allowable land uses, utility infrastructure, and Natural Area management responsibility for Parcel ED-1. The purpose of the modifications is to enhance the development potential of the Horizon Center business/industrial park, while ensuring protection of the adjacent Natural Area. The area addressed by the proposed action was evaluated for various industrial/business uses in the

179

EERE Program Management Initiative (PMI) Brochure  

Office of Energy Efficiency and Renewable Energy (EERE)

The EERE Program Management Initiative document outlines a coordinated set of actions to improve its program management capabilities.

180

Energy Action Month | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and water that can help you meet critical agency mission goals, see Federal Energy and Water Management Awards to read about model Federal projects. During Energy Action Month...

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EIS-0389: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0389: Mitigation Action Plan Trinity Public Utilities District Direct Interconnection Project Western Area Power Administration (Western) proposes to...

182

EA-1595: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor...

183

Proposal Guidance for Fiscal Year 2014 | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

capability web pages. An EMSL user proposal requires detailed information for a thorough peer and management review. The Proposal Planning document (.pdf) will walk you through...

184

management  

National Nuclear Security Administration (NNSA)

5%2A en Management and Budget http:nnsa.energy.govaboutusouroperationsmanagementandbudget

P...

185

Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2004 14, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38) Joe DeHerrera Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Proposed Weaver Slough Conservation Easement Project No: 2002-042 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS [page A/2]): 1.2 Easement Acquisition Location: Flathead River System, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Flathead Land Trust Description of the Proposed Action: BPA proposes to purchase the conservation easements on the Sanders (307 acres) and Seabaugh (449 acres) parcels of the Weaver Slough to ensure that

186

Integrating Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Mission Execution by Mission Execution by Integrating our Management Systems Integrating our Management Systems 1 W e e k l y O p e r a t i o n s M e e t i n g N o v e m b e r 1 , 2 0 1 1 M i c h a e l J . W e i s Pulling the Pieces Together for Improving DOE Management to Enable Mission Execution 2 ï‚— Process changes Process changes ï‚— Behavioral changes Behavioral changes ï‚— System changes System changes Process Change Approach Strengthening and Expediting Decision Making 3 Proposed Outcomes Horizontal Integration Incoming DOE Business Crosscutting Issues (i.e. NLDC input) Hi-level Roadblocks Operations Management Council Associate Deputy Secretary Collaborative Action Process Chief Operating Officer Weekly Operations Council (OMC) Super 8 Secretary (ADS) (CAP) Board (COOB) p Meeting Endorsement / Commitment Super 8 US Meetings COO Meetings

187

Standards Actions, May 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-29-2002 4-29-2002 Activity Summary In Conversion - 4 In Preparation - 47 Out for Comment - 12 Published this Month - 6 5-year Review Status Revision in Progress - 10 Reaffirmation in Progress - 12 Supersedure in Progress - 0 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 20 Inside this issue: DOE Technical Standards Proposed for Reaffirmation 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- May 2002 Standards Actions DOE Technical Standards Proposed for Reaffirmation The following documents are currently being reevaluated under the 5-year

188

Final voluntary release assessment/corrective action report  

SciTech Connect

The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

NONE

1996-11-12T23:59:59.000Z

189

Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Testbed Results Current Testbed Research Proposal Process Terms and Conditions Dark Fiber Testbed Performance (perfSONAR) Software & Tools Development Partnerships...

190

Unsolicited Proposals  

Directives, Delegations, and Requirements

The order sets forth Department of Energy (DOE) requirements and responsibilities for the receipt, processing, and review of unsolicited proposals (USPs). To ensure that those submitting USPs are notified in a timely manner of the status (e.g., pending, accepted for funding, or declined) of their proposals. Cancels DOE O 542.2. Certified 12-28-06.

2002-02-27T23:59:59.000Z

191

Conceptual Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

-1-08 submitted to Energy Engineering -1-08 submitted to Energy Engineering Action-Oriented Benchmarking: Using the CEUS Database to Benchmark Commercial Buildings in California Paul Mathew & Evan Mills, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT The 2006 Commercial End Use Survey (CEUS) database developed by the California Energy Commission is a far richer source of energy end-use data for non-residential buildings than has previously been available and opens the possibility of creating new and more powerful energy benchmarking processes and tools. In this article - Part 2 of a two-part series - we describe the methodology and selected results from an action-oriented benchmarking approach using the new

192

Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4  

SciTech Connect

This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

A. M. Tyson

2006-08-01T23:59:59.000Z

193

DOE/EIS-0265-SA-169: Supplement Analysis for the Watershed Management Program EIS --Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing (08/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Mickey Carter Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 2.15 Acquisition of Sensitive Riparian Resources, 6.10 Access Fencing Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the installation of a fenced stream crossing over the Pahsimeroi River to enhance a livestock riparian exclosure.

194

Unsolicited Proposals  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy's (DOE’s) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas.   

195

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-78) (5/9/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 9, 2002 May 9, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-78) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II (modification to DOE/EIS-0265/SA-72). Project No: 1997-051-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase approximately 310 acres of privately-owned

196

(DOE/EIS-0265/SA-101): Supplement Analysis for the Watershed Management EIS 1/2/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2003 , 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-101) Mark Shaw, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Restoration of Anadromous Fish Access to Hawley Creek Project No: 2001-052-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.18: Purchase / Negotiate Water Right Location: Lemhi, Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Lemhi Soil and Water Conservation District, with the cooperation of the Idaho Governor's Office of Species Conservation. Description of the Proposed Action: BPA proposes to fund a project to enhance fish habitat on

197

Action Codes Table | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Action Codes Table | National Nuclear Security Administration Action Codes Table | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Action Codes Table Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Code Tables > Action Codes Table

198

March 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2007 March 2007 Continued on next page TSP Manager's Notes 1 Domestic Programs (American National Standards) Overview 2 Aerospace Industry Advocates Standards Selection Based on Technical Merit, Not Semantics 3 Report Recommends Withdrawal of OMB Risk Assessment Bulletin 4 Technical Standards Manager Spotlight 5 Topical Committee Developments 6 Welcome Aboard the TSMC! 7 Standards Actions 8 DOE Standards Actions 8

199

December 2006 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2006 December 2006 TSP Manager's Notes 1 Meeting In The Middle 2 Plain Talk for a New Generation 3 Licensing New Nuclear Power Plants 4 ANSI Government Affairs Overview 5 Technical Standards Manager Spotlight 7 Topical Committee Developments 8 Welcome Aboard the TSMC! 8 Standards Actions 9 DOE Standards Actions 9

200

EIS (DOE/EIS-0246/SA-17) Supplement Analysis for the Wildlife Management Program EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 13, 2001 September 13, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17) Joe HeHerrera - KEWU Fish and Wildlife Project Manager Proposed Action: Eagle Lakes Ranch Acquisition and Restoration Project No: 2000-025-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee-Title Acquisition Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service (USFWS), Columbia National Wildlife Refuge Description of the Proposed Action: BPA proposes to partially fund the acquisition of 7,630 acres

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21813 21813 Vol. 76, No. 75 Tuesday, April 19, 2011 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket Number: EERE-2010-BT-CE-0014] RIN 1904-AC23 Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Proposed rule. SUMMARY: The U.S. Department of Energy (DOE or the ''Department'') proposes to amend the compliance dates for revisions to its certification, compliance, and enforcement regulations for certain commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the ''Act''). Specifically, DOE is tentatively proposing an 18-month extension to the

202

Office of Legacy Management Categorical Exclusion Determination Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Office of Legacy Management Categorical Exclusion Determination Form Prog ram or Field Office: Office of Legacy Management Proj ect Tit le and 1.0. No.: Routine Maintenance Activities at the Grand Junction Regional Airport, Colorado, Calibration Model Facility. LM # 44 -11. Location: Grand Junction, Colorado Proposed Action or Proj ect Description: DO E proposes to conduct routine maintenance actions as needed at a facility containing five concrete calibration pads. The facility is located at the Grand Junction Regional Airport on property leased from the Airport Authority. Renewal of the lease generally takes place every 5 years with the next renewal anticipated in 2013. Routine maintenance actions might include site inspections and vehicle vacuum sweeping of the pads. The small amount

203

The Standards Forum and Standards Actions - June 2001 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 Inside this issue: Should DOE Organizations Include DOE O 252.1 in their Contracts?....................................................... 1 Metrology/Accreditation Personnel and Nuclear Weapons Complex Managers Take Action Addressing Current Issues at Joint Annual Meeting........................................................................ 1 A Note from the Manager........................................................................................................................ 2 Welcome Aboard the TSMC!..................................................................................................................

204

Bonneville - Hood River Vegetation Management Environmental Assessment  

SciTech Connect

To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

N /A

1998-08-01T23:59:59.000Z

205

April 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-27-2008 3-27-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in March - 0 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ April 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

206

July 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2007 6-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed forReaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/ July 2007 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

207

October 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publication Staff Roster 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-26-2006 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 16 Published in September - 1 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ October 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access

208

February 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards Program Document Status 1-18-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 10 Published in January - 3 5-year Review Status Proposed for Revision-6 Revision in Progress-4 Proposed for Reaffirmation-3 Reaffirmation in Progress-21 Cancellation Pending-16 Cancellation in Progress-0 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/ February 2005 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://tis.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

209

July 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards Program Document Status 06-28-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 14 Published in June - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ July 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

210

May 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-25-2008 4-25-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in April - 2 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ May 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

211

November 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-25-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 16 Published in September - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6

212

August 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 07-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

213

October 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-27-2007 Activity Summary In Conversion - 4 In Preparation - 26 Out for Comment - 27 Published in September - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

214

April 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 1 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 3-28-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 11 Published in March - 0 5-year Review Status Proposed for Revision-6 Revisions in Progress-4 Proposed for Reaffirmation-3 Reaffirmations in Progress-24 Cancellations Pending-11 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards

215

August 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 16 Published in July - 2 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0

216

EA-1728: Integrated Vegetation Management on the Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728: Integrated Vegetation Management on the Hanford Site, 728: Integrated Vegetation Management on the Hanford Site, Richland, Washington EA-1728: Integrated Vegetation Management on the Hanford Site, Richland, Washington Summary This EA evaluates the environmental impacts from vegetation management in the "project area" of the Hanford Site. The project area excludes most of the Hanford Reach National Monument that is managed by the U.S. Fish and Wildlife Service (USFWS) under permit from DOE. Vegetation managment under the EA would be consistent with and complement similar efforts currently being performed by the USFWS on the Monument. Based on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of NEPA, and that preparation of

217

EA-1728: Integrated Vegetation Management on the Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28: Integrated Vegetation Management on the Hanford Site, 28: Integrated Vegetation Management on the Hanford Site, Richland, Washington EA-1728: Integrated Vegetation Management on the Hanford Site, Richland, Washington Summary This EA evaluates the environmental impacts from vegetation management in the "project area" of the Hanford Site. The project area excludes most of the Hanford Reach National Monument that is managed by the U.S. Fish and Wildlife Service (USFWS) under permit from DOE. Vegetation managment under the EA would be consistent with and complement similar efforts currently being performed by the USFWS on the Monument. Based on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of NEPA, and that preparation of

218

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

California Energy Commission PROPOSED REGULATIONS ENFORCEMENT PROCEDURES CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor FEBRUARY 2013 CEC3002013002SD #12;CALIFORNIA ENERGY COMMISSION Lorraine Gonzalez Angela Gould Primary Authors and Project Managers Kate Zocchetti

219

DOE/EIS-0265-SA-170: Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project (8/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2004 1, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-170) Jonathan McCloud Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Tapteal Bend Riparian Corridor Restoration Project Project No: 2002-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.9 Structural Bank Protection Using Bioengineering Methods, 2.1 Maintain Healthy Riparian Plant Communities Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) and the Tapteal Bend Greenway Association Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

220

(DOE/EIS-0285-SA-87): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Cowlitz Tap-Olympia White River 7/23/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-87) Mark Shaw TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Protect and Restore the Asotin Creek Watershed - Upper Charley Subwatershed Ecosystems Restoration Projects (road obliteration) Project No: 2002-054-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 7.18 Road Closure Location: Charley Creek Subwatershed, Umatilla National Forest, Idaho Proposed by: Bonneville Power Administration (BPA) and the Nez Perce Tribal Fisheries/Watershed Program Description of the Proposed Action: BPA is proposing to fund a project that will address

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) 5/31/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2002 31, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management at the Lines Creek Microwave site. The proposed work will be accomplished within the fenced area of the facility. Location: The Lines Creek Microwave site is located at SWSW Section 33 T44N R2E within Shoshone County, Idaho, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes bare ground vegetation management at the microwave site. Bare ground management is needed to prevent fire damage and maintain a vegetation free environment on the site.

222

Emergencies and Emergency Actions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergencies and Emergency Actions Emergencies and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. September 8, 2005 Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina;

223

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) (10/4/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) Jay Marcotte Fish and Wildlife Project Manager Proposed Action: Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin. Project No: 2001-039-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Various Walla Walla River Basin Irrigation Diversions, Washington Proposed by: Bonneville Power Administration (BPA), the Walla Walla County Conservation District. Description of the Proposed Action: BPA is proposing to provide cost share for a program that

224

(DOE/EIS-0265/SA-92): Supplement Analysis for the Watershed Management Program EIS 10/16/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2) 2) Dorothy Welch, KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Asotin Creek Six-Year Direct Seed Program Project No: 1999-060-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 3.2 Conservation Copping Sequence, 3.3 Conservation Tillage, 3.8 Delayed Seed Bed Preparation, 3.9 Grasses and Legumes in rotation, 3.26 Evaluate Field Limitations, 3.27 Equipment Calibration and Use. Location: Various locations in the Asotin Creek Watershed, WA. Proposed by: Bonneville Power Administration (BPA) and Asotin County Conservation District (ACCD). Description of the Proposed Action: BPA proposes to fund a no-till/direct seed farming

225

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-70) (10/23/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2001 23, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-70) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase I. Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Description of the Proposed Action: BPA proposes to purchase 4 privately owned parcels totaling

226

(DOE/EIS-0265/SA-03): Supplement Analysis for the Watershed Management Program EIS 10/16/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) 3) Dorothy Welch, KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Couse/Tenmile Creeks Six-Year Direct Seed Program Project No: 2002-050-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 3.2 Conservation Cropping Sequence, 3.3 Conservation Tillage, 3.8 Delayed Seed Bed Preparation, 3.9 Grasses and Legumes in Rotation, 3.26 Evaluate Field Limitations, 3.27 Equipment Calibration and Use Location: Various properties in Anatone, Asotin County, Washington Proposed by: Bonneville Power Administration (BPA) and The Asotin County Conservation District (ACCD). Description of the Proposed Action: BPA proposes to fund a six-year direct seed program

227

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-72)(12/3/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 3, 2001 December 3, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-72) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II. Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase 2 privately owned parcels

228

Supplement Analysis for the Watrshed Management Program EIS (DOE/EIS-0265/SA-75) (2/20/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2002 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-75) Peter Lofy - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Gourlay Creek Fish Ladder Project Project No: 2001-038-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Columbia County, Oregon Proposed by: Bonneville Power Administration (BPA) and the City of Scappoose Description of the Proposed Action: BPA proposes to fund the construction of a fish passage facility at the Gourlay Creek Dam/water reservoir in Columbia County, Oregon. The City of

229

SAVEnergy Action Plans  

SciTech Connect

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

230

February 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Technical Standards Program Document Status Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ Activity Summary In Conversion - 4 In Preparation - 35 Out for Comment - 18 Published this Month - 1 FY 2001 5-year Reviews Revisions in Progress - 2 Reaffirmations in Progress - 2 Supersedures in Progress - 6 Cancellations Pending - 11 Cancellations in Progress - 33 No Current Action - 16 DOE Technical Standards Project Canceled If you have any questions about this action, please contact the person listed be- low. The following DOE Technical Standards project was recently canceled: * EM Facility Hazard Categorization, Project Number SAFT-0029; EM Technical Standards Manager, John Serocki, 301-903-7999, John.Serocki@em.doe.gov, or Tom Wright, 301-903-3661, Tom.Wright@em.doe.gov. The need for this

231

EIS-0337: West Valley Demonstration Project Waste Management  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the Final West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy’s proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities.

232

U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.).  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COALITION; COALITION; INFORMATION NETWORK FOR RESPONSIBLE MINING; CENTER FOR NATIVE ECOSYSTEMS; CENTER FOR BIOLOGICAL DIVERSITY; and SHEEP MOUNTAIN ALLIANCE, Plaintiffs, v. OFFICE OF LEGACY MANAGEMENT; and UNITED STATES DEPARTMENT OF ENERGY, Defendants. OPINION AND ORDER This matter is before the Court on Plaintiffs' appeal seeking judicial review of (1) Defendants' decision in 2007 to expand the Uranium Lease Management Program ("ULMP") in southwestern Colorado; (2) Defendants' issuance of leases to uranium mining companies under the ULMP; and (3) Defendants' approvals of exploration or reclamation activities on certain lease tracts. The matter has been fully briefed (ECF No. 78, 82, 88), and Defendants have submitted the administrative record to the Court

233

(DOE/EIS-0285/SA-64): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/26/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2002 6, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-64) Truman Conn - TFP Regional Manager, Walla Walla Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities in the Walla Walla Region (See Attachment A for a complete list of facilities) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities

234

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-96) Snohomish District Substations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6) 6) - Snohomish District Substations Dennis Sjoquist - TFN/Snohomish Snohomish Regional Manager Proposed Action: Vegetation Management for the following facilities located in the Snohomish District: Bellingham Custer Fidalgo Intalco Lopez Island Monroe Murray, V.M. Snohomish Snoking Whatcom Whatcom Skagit Whatcom San Juan Snohomish Snohomish Snohomish Snohomish Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Snohomish District of the Snohomish Region. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities.

235

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-94) Covington District Substations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4) 4) - Covington District Substations Dennis Sjoquist - TFN/Snohomish Snohomish Regional Manager Proposed Action: Vegetation Management for the following facilities located in the Covington District: Covington Echo Lake Lynch Creek Maple Valley Narrows Raver, P.J. South Tacoma Steilacoom Surprise Lake Tacoma King King Pierce King Pierce King Pierce Pierce Pierce Pierce Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Covington District of the Snohomish Region. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities.

236

Off-site Nuclear Emergency Management -Capabilities and Challenges -Salzburg, Austria, 29 September -3 October 2003 Protective Actions in the Late Phase -Intervention Criteria and Decision-making  

E-Print Network (OSTI)

in the late phase of a nuclear or radiological accident where long-lived radionuclides have been dispersed AND COUNTERMEASURES A nuclear accident is normally divided into three phases: a pre-release phase with a time scaleOff-site Nuclear Emergency Management - Capabilities and Challenges - Salzburg, Austria, 29

237

Proposed Rules DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 76, No. 1 / Monday, January 3, 2011 / Proposed Rules DEPARTMENT OF ENERGY [Docket ID: DOE-HQ-2010-0002] 10 CFR Part 1021 RIN 1990-AA34 National Environmental Policy Act Implementing Procedures AGENCY: Office of the General Counsel, U.S. Department of Energy. ACTION: Notice of proposed rulemaking and public hearing. SUMMARY: The U.S. Department of Energy (DOE or the Department) proposes to amend its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The majority of the changes are proposed for the categorical exclusions provisions contained in its NEPA Implementing Procedures, with a small number of related changes proposed for other provisions. These proposed changes are intended to better align the

238

August 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-31-2001 7-31-2001 Activity Summary In Conversion-4 In Preparation-43 Out for Comment-17 Published this Month-0 5-year Review Status Revision in Progress-6 Reaffirmation in Progress-23 Cancellation Pending-4 Cancellation in Progress-12 Proposed for Cancellation-13 No Current Action-11 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standard Recently Reaffirmed 1 DOE Technical Standards Recently Published 2 American National Standards Institute 2 American National Standards 4 American Society for Testing and Materials 5 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- August 2001 Standards

239

Recommendations for improvements to program and project management  

SciTech Connect

Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

Not Available

1994-01-01T23:59:59.000Z

240

3Q/4Q99 F-Area Hazardous Waste Management Facility Corrective Action Report - Third and Fourth Quarter 1999, Volumes I and II  

SciTech Connect

Savannah River Site (SRS) monitors groundwater quality at the F-Area Hazardous Waste management Facility (HWMF) and provides results of this monitoring to the South Carolina Department of Health and Environmental Control (SCDHEC) semiannually as required by the Resource Conservation and Recovery Act (RCRA) permit. SRS also performs monthly sampling of the Wastewater Treatment Unit (WTU) effluent in accordance with Section C of the Underground Injection Control (UIC) application.

Chase, J.

2000-05-12T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DOE/EIS-0265-SA-168: Supplement Analysis for the Watershed Management Program EIS - Protect and Restore Lolo Creek Watershed - Jim Brown Creek Streambank Stabilization (08/10/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-168) Sabrina Keen Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Protect and Restore Lolo Creek Watershed - Jim Brown Creek Streambank Stabilization Project No: 1996-077-02 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection using Bioengineering Methods Location: Clearwater County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Nez Perce Tribe Description of the Proposed Action: The Bonneville Power Administration, Nez Perce Tribe, and Potlatch Corporation are proposing to stabilize streambanks along Jim Brown Creek near

242

July 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 06-28-2005 Activity Summary In Conversion - 4 In Preparation - 21 Out for Comment - 10 Published in June - 2 5-year Review Status Proposed for Revision-6 Revision in Progress-3

243

December 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Standards Forum & Standards Actions Page 1 December 2007 The Standards Forum & Standards Actions Page 1 December 2007 Continued on next page Technical Standards Program Manager's Note 1 Teaching Standards Development- Inspiring the Next Generation 2 The EPA Radiation Standard for Spent-Fuel Storage in a Geological Repository 3 Expanded Access to Hydrogen Codes and Standards 4 Really Following the Building Code 6 Technical Standards Manager Spotlight 7

244

EAC Recommendations for DOE Action Regarding Development of the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next...

245

Action plan for the Tiger Team assessment report  

SciTech Connect

This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

Not Available

1990-08-30T23:59:59.000Z

246

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) (9/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2001 7, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Pelican Creek Crossing Improvement Project No: 1992-026-01 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.13 Culvert Removal/Replacement to Improve Fish Passage. Location: Pelican Creek, Union County, Oregon Proposed by: Bonneville Power Administration (BPA), the Grande Ronde Model Watershed Program (GRMWP), and the Union County Public Works Department (UCPWD) Description of the Proposed Action: BPA provides funds to the Grande Ronde Model Watershed

247

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-68)(10/12/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2001 12, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-68) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Mill Creek and Little Creek Crossing Improvement Project No: 1992-026-01 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.13 Culvert Removal/Replacement to Improve Fish Passage. Location: Mill Creek and Little Creek, Union County, Oregon Proposed by: Bonneville Power Administration (BPA), the Grande Ronde Model Watershed Program (GRMWP), and the Union County Public Works Department (UCPWD) Description of the Proposed Action: BPA provides funds to the Grande Ronde Model Watershed

248

Joint Environmental Assessment of the California Department of Food and Agriculture Curly Tope Virus Control Program for the Bureau of Land Management and Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JOINT ENVIRONMENTAL ASSESSMENT JOINT ENVIRONMENTAL ASSESSMENT 2002-2006 OF THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE CURLY TOP VIRUS CONTROL PROGRAM FOR BUREAU OF LAND MANAGEMENT AND DEPARTMENT OF ENERGY DOE/EA-# 1363 April, 2002 2 TABLE OF CONTENTS Page No. I. INTRODUCTION 9 A. Purpose and Need......................................................... 10 B. Background................................................................... 10-11 II. PROPOSED ACTIONS AND ALTERNATIVES Alternative 1 - Proposed Action........................................... 12 General Program.................................................... 12-15 Program Specifics.................................................. 15-18 Public Health and Environmental Considerations:

249

Proposed Transmission Towers Proposed New Substation Sites Proposed...  

NLE Websites -- All DOE Office Websites (Extended Search)

6-1E: Recreation Inset Maps for Map 6-1C and Map 6-1D Proposed Transmission Towers Proposed New Substation Sites Proposed Route Segments (not drawn to scale) New Access Roads...

250

http://www.oha.doe.gov/regs/Proposed708.htm  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

[6450.01P] [6450.01P] DEPARTMENT OF ENERGY 10 CFR PART 708 [RIN 1901-AA78] Criteria and Procedures for DOE Contractor Employee Protection Program AGENCY: Department of Energy ACTION: Notice of proposed rulemaking SUMMARY: The Department of Energy (DOE) proposes amendments for its contractor employee protection program which provides recourse to DOE contractor employees who believe they have been retaliated against for activities such as a disclosure of information regarding management of environmental, safety, health, and other matters, for participating in Congressional proceedings, or for refusing to engage in illegal or dangerous activities. DATES: Written comments should be forwarded not later than ____________ [insert the date 60 days from date of this FR

251

Columbia River Gorge Vegetation Management Project Final Environmental Assessment DOE/EA-1162  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COLUMBIA COLUMBIA RIVER MANAGEMENT PR GORGE OJECT VEGETAT ON Final Environmental Assessment DO E/EA-l 162 BONNEVILLE row,. ..", ",,,,.,,0. W x ? -- -- ------ .- .-- b I . , (, I I I ( t ,1 ,0 , . ,' I , ,- , !" 1 , I I ,; ,, 1 1 I .1 . . COLUMBIA RIVER GORGE VEGETATION MANAGEMENT ENVIRONMENTAL ASSESSMENT (Hanford-Ostrander and North BonnevilI&Midway Transmission Line Rights-of-Way) Table of Contents Page . 2 3 pqose and Need Background hbfic evolvement Swq ' ' Decbions to Be Made PROPOSED A~ON AND ~~RNA~S Mtemative k No Action " Manual, Mechnical, and Biological Metbh - Ntemative W. Proposed Action- htegrated Vegetation Management ~) tih Herbicides Herbici& Meth& -. PhedActions Comparison of Mtematives ~ . . . . . . ti~D E~OW~ ~ E_O_~m .. CONSEQ~N~S Affmd Environment . Environment Consquen~ hti Use Soils Vegetation Water Resources WildlfeResources Air Quali@lGlobal Warning

252

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)  

SciTech Connect

BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

N /A

2001-05-01T23:59:59.000Z

253

DOE/EIS-0285/SA-101: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Spokane Region (9/13/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 13, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-101) Spokane Region Michael F. Brock - TFS/BELL-1 Regional Manager, Spokane Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities (See Attachment A for a complete list of facilities) Location: Spokane Region. (See Attachment A) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare

254

Rem&al Action Performed  

Office of Legacy Management (LM)

Rem&al Action Performed Rem&al Action Performed at the B&T Metals Site in * Columbus, Ohio Department of Energy Office of Assistant Manager for Environmenta/ Management Oak Ridge Operations June 2007 Printed on recycled/recyclable paper. 1.41 2503.2 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PER-FORMED AT THE B&T METALS SITE IN COLUMBUS, OHIO JUNE 200 1 Prepared for United States Department of Energy Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 B&TFinal 6/2001 CONTENTS FIGURES ..................................................................................................................................................... iv ACRON-YhiS ...............................................................................................................................................

255

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/28/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 28, 2002 June 28, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-27) Ron Morinaka, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Abbot Creek Fish Barrier Project (Hungry Horse Mitigation / Habitat Improvements) Project No: 1991-19-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 8.2 Control of Predators and Nuisance Animals Location: Kalispell, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife & Parks Description of the Proposed Action: BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout

256

EIS (DOE/EIS-0246/SA-18) Supplement Analysis for the Watershed Management Program EIS 10/17/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: October 17, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-18) Charlie Craig - KEWU Fish and Wildlife Project Manager Proposed Action: Eugene Wetlands Acquisition Phase II Project No: 1992-059-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee- Title Acquisition, 1.2 Easement Acquisition. Location: Lane County, Oregon Proposed by: Bonneville Power Administration (BPA) and The Nature Conservancy Description of the Proposed Action: BPA proposes to fund the acquisition and preservation of approximately 99 acres of native wet prairie and oak woodland habitat in Lane County, Oregon.

257

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

258

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

259

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

260

Categorization of residential electricity consumption as a basis for the assessment of the impacts of demand response actions  

Science Journals Connector (OSTI)

Abstract In a smart(er) grid context, the existence of dynamic tariffs and bidirectional communications will simultaneously allow and require an active role from the end-user concerning electricity management. However, the residential end-user will not be always available to manage energy resources and decide, based on price signals and preferences/needs, the best response actions to implement or the best usage of the electricity produced locally. Therefore, energy management systems are required to monitor consumption/generation/storage and to make the best decisions according to input signals and the user's needs and preferences. The design of adequate algorithms to be implemented in those systems require the prior characterization of domestic electricity demand and categorization of loads, according to availability, typical usage patterns, working cycles and technical constraints. Automated demand response actions must be tailored and chosen according to this previous analysis of load characteristics. In this paper, a characterization of household electricity consumption is presented and an operational categorization of end-use loads is proposed. The existing potential for demand response to a diversified set of management actions is described and a tool to assess the impact of implementing several actions with different rates of penetration of energy management systems is presented. The results obtained show the potential savings for the end-user and expected changes in the load diagram with a decrease of the aggregated peak electricity demand and a smoothed valley.

Ana Soares; Álvaro Gomes; Carlos Henggeler Antunes

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

February 2013 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Standards Actions Technical Standards Program Newsletter U . S . D E PA R T M E N T O F O ffi ce O f nuclear SaFety ENERGY inSide thiS iSSue * Featured DOE Technical Standards Activities * DOE Technical Standards Cost- Savings and Access Improvement Initiative * Domestic and International Nuclear Energy Voluntary Consensus Standards Needs * Nuclear Safety- Related Standards Activity Featured dOe technical StandardS activitieS DOE Technical Standards Cost-Savings and Access Improvement Initiative By Helen Todosow, Brookhaven National Laboratory The Department of Energy (DOE) Technical Standards Managers (TSM) are actively exploring ways to save the government and tax payers' money while at the same time significantly improving efficiencies in access and use of voluntary consensus

262

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

263

Enforcement actions: Significant actions resolved; Quarterly progress report, October--December 1993: Volume 12, No. 4  

SciTech Connect

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1994-03-01T23:59:59.000Z

264

California Energy Commission PROPOSED REGULATIONS  

E-Print Network (OSTI)

California Energy Commission PROPOSED REGULATIONS MARCH 2012 CEC-400-2010-004-SD3, Article 9, Sections 1680 1685 CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor #12;CALIFORNIA ENERGY COMMISSION Martha Brook Program Senior Mechanical Engineer Justin Regnier Project Manager

265

(DOE/EIS-0285/SA-04): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/27/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 27, 2001 March 27, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-04) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Ponderosa - Pilot Butte 18/2 to 18/4 Relocation Location: The project area is in the City of Bend, OR, in Deschutes County. Proposed by: Bonneville Power Administration Description of the Proposed Action: BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa - Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. Analysis: 1. Description of right-of-way and vegetation management needed: The project involves

266

DOE/EIS-0285-SA-62: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (4/16/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE April 16, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Rocky Reach - Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. Location: The ROW is located King County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and

267

DOE/EIS-0265-SA-164: Supplement Analysis for the Watershed Management Program EIS (8/2/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2004 , 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-164) Mickey Carter TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - L-9 Irrigation Diversion Modification Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish Passage Enhancement - Fishways, 4.1 Irrigation Water Management, 4.2 Water Measuring Devices, 4.23 Intake and Return Diversion Screens, 4.25 Consolidation/Replace Irrigation Diversion Dams Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Lemhi Soil and Water Conservation District

268

Aggregating trust using triangular norms in the keynote trust management system  

Science Journals Connector (OSTI)

A Trust Management model that provides a measure of the degree to which a principal is trusted for some action is proposed. At the heart of the model is the notion that triangular norms and conorms provide a natural and consistent interpretation for ...

Simon N. Foley; Wayne Mac Adams; Barry O'Sullivan

2010-09-01T23:59:59.000Z

269

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...  

Office of Environmental Management (EM)

Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

270

Corrective Action Tracking System User's Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corrective Action Tracking System User's Guide Corrective Action Tracking System User's Guide Corrective Action Tracking System User's Guide September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes process requirements and responsibilities for DOE line managers to develop and implement corrective actions to effectively resolve safety findings arising from: Findings as identified by the Office of Independent Oversight and Performance Assurance Environment, Safety and Health and Emergency Management assessments; Judgments of Need as identified by Type A accident investigations: Other sources as directed by the Secretary or Deputy Secretary, including crosscutting safety findings. Corrective Action Tracking System User's Guide

271

Corrective Action Tracking System User's Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corrective Action Tracking System User's Guide Corrective Action Tracking System User's Guide Corrective Action Tracking System User's Guide September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes process requirements and responsibilities for DOE line managers to develop and implement corrective actions to effectively resolve safety findings arising from: Findings as identified by the Office of Independent Oversight and Performance Assurance Environment, Safety and Health and Emergency Management assessments; Judgments of Need as identified by Type A accident investigations: Other sources as directed by the Secretary or Deputy Secretary, including crosscutting safety findings. Corrective Action Tracking System User's Guide

272

Energy Management Working Group: Accelerating Energy Management  

E-Print Network (OSTI)

Countries participating in the Global Superior Energy Performance (GSEP) Energy Management Working Group (EMWG) are leveraging their resources and taking collective action to strengthen national and international efforts to facilitate the adoption...

Scheihing, P.

2014-01-01T23:59:59.000Z

273

EIS-0279: Spent Nuclear Fuel Management, Aiken, South Carolina | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Spent Nuclear Fuel Management, Aiken, South Carolina 79: Spent Nuclear Fuel Management, Aiken, South Carolina EIS-0279: Spent Nuclear Fuel Management, Aiken, South Carolina SUMMARY The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 5, 2013 EIS-0279: Amended Record of Decision Spent Nuclear Fuel Management at the Savannah River Site April 1, 2013 EIS-0279-SA-01: Supplement Analysis Savannah River Site Spent Nuclear Fuel Management (DOE/EIS-0279-SA-01 and

274

Negotiating equity for management of DOE wastes  

SciTech Connect

One important factor frustrating optimal management of Department of Energy (DOE)-complex wastes is the inability to use licensed and permitted facilities systematically. Achieving the goal of optimal use of DOE`s waste management facilities is politically problematic for two reasons. First, no locale wants to bear a disproportionate burden from DOE wastes. Second, the burden imposed by additional wastes transported from one site to another is difficult to characterize. To develop a viable framework for equitably distributing these burdens while achieving efficient use of all DOE waste management facilities, several implementation and equity issues must be addressed and resolved. This paper discusses stakeholder and equity issues and proposes a framework for joint research and action that could facilitate equity negotiations among stakeholder and move toward a more optimal use of DOE`s waste management capabilities.

Carnes, S.A.

1994-09-01T23:59:59.000Z

275

JGI - CSP Proposal Study Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

User Programs User Programs Project Management Office Community Science Program Emerging Technologies Opportunity Program Technology Development Pilot Program Genomic Encyc. of Bacteria and Archaea MyJGI: Information for Collaborators The CSP Proposal Study Panel CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | Project Management | Forms | FAQ | People and Contacts Members Nina Agabian University of California, San Francisco, http://www.ucsf.edu Chris Amemiya Benaroya Research Institute at Virginia Mason, http://www.benaroyaresearch.org Gary L. Andersen Lawrence Berkeley National Laboratory, http://www.lbl.gov Jo Ann Banks Purdue University, http://www.purdue.edu John Battista Louisiana State University, http://www.lsu.edu Fred Brockman

276

(DOE/EIS-0285/SA-81): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/9/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 9,2002 July 9,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-81) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for fifteen Substations in The Dalles District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within The Dalles District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

277

(DOE/EIS-0285/SA-74): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/1/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-74) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for five Substations in the Malin District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Malin District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In addition,

278

(DOE/EIS-0285/SA-82): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 13, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3,2002 3,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82 Jeffrey Hathhorn Redmond Deputy Regional Manager - TFI/IDAHO FALLS Proposed Action: Vegetation Management for twenty-four Substations in the Burley District. See list of facilities under planning step 1). Location: See list of facilities under Planning Step 1. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

279

(DOE/EIS-0285/SA-78): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (07/01/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-78) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for ten Substations in the Redmond District. (See list of facilities listed under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Redmond District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In

280

LANSCE | User Resources | Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Lujan Neutron Scattering Center: First Call for Proposals is now Closed. Thank you for your Submission. Proposal Submission The Lujan Center call for proposals opens May 6, 2014....

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

LANSCE | User Resources | Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals LANSCE accepts proposals for the Lujan Neutron Scattering Center, Proton Radiography (pRad) and the Weapons Neutron Research Facility (WNR). Calls for proposals are...

282

DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAG EMENT CENTER MANAG EMENT CENTER NEPA DETERMINATION RECIPIENT:City of Philadelphia PROJECT TITLE: Ambler Boiler House Geothermal Wells, Cool Roof and PV installation Page 1 of3 STATE: PA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOO148 DE-EE-0003568 GFO-OOO3568-001 0 Based on my review urthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA). I have made the follm~'ing determination: ex. EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conse rve energy or water (a) ActIons to conserve energy or water, demonstrate potential energy or water conservation, and promote energy efficiency that would not have the potential to cause significant changes in the indoor or outdoor concentrations of potentially harmful

283

(DOE/EIS-0285/SA-46): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6) 6) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Franklin County noxious weed management along BPA rights-of-ways, transmission structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the ROW, ROW width, and ROW length of the proposed action. Includes all BPA 115kV, 230kV, and 500 kV ROWs in Franklin County, Washington. Location: The ROWs are all located in Franklin County, Washington in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear noxious and/or unwanted low-growing vegetation in all BPA ROWs in Franklin County, Washington. In a cooperative effort, BPA, through landowners and the Franklin County Weed Control Board, plan to eradicate noxious plants and other

284

(DOE/EIS-0285/SA-45): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5) 5) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Benton County noxious weed management along BPA rights-of-ways, transmission structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the ROW, ROW width, and ROW length of the proposed action. Includes all BPA 115kV, 230kV, 345kV and 500 kV ROWs in Benton County, Washington. Location: The ROWs are all located in Benton County, Washington, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear noxious and/or unwanted low-growing vegetation in all BPA ROWs in Benton County, Washington. In a cooperative effort, BPA, through landowners and the Benton County Weed Control Board, plan to eradicate noxious plants and other

285

Request for Proposal | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Request for Proposal | National Nuclear Security Administration Request for Proposal | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Request for Proposal Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract >

286

Comparing Double String Theory Actions  

E-Print Network (OSTI)

Aimed to a deeper comprehension of a manifestly T-dual invariant formulation of string theory, in this paper a detailed comparison between the non-covariant action proposed by Tseytlin and the covariant one proposed by Hull is done. These are obtained by making both the string coordinates and their duals explicitly appear, on the same foot, in the world-sheet action, so "doubling" the string coordinates along the compact dimensions. After a discussion of the nature of the constraints in both the models and the relative quantization, it results that the string coordinates and their duals behave like "non-commuting" phase space type coordinates but their expressions in terms of Fourier modes generate the oscillator algebra of the standard bosonic string formulation. A proof of the equivalence of the two formulations is given. Furthermore, open-string solutions are also discussed.

Luca De Angelis; S. J. Gabriele Gionti; Raffaele Marotta; Franco Pezzella

2013-12-27T23:59:59.000Z

287

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

288

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

289

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

290

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

291

(DOE/EIS-0285/SA-75): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (06/21/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June June 21, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington. Jim Jellison -- - TFO/Olympia Ed Tompkins -- - TFO/Ross Proposed Action: Vegetation Management for the Ross Lexington Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and

292

(DOE/EIS-0285/SA-103): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 12, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-103-Keeler-Pennwalt). Jim Jellison - TFO/Olympia Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for the Keeler-Pennwalt transmission line and parts of the St. John-Keeler, Rivergate-Keeler, Keeler-Oregon City, & St. John-St. Helens lines. Location: Washington and Multnomah Counties, Oregon Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: See the attached checklist for the

293

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

294

(DOE/EIS-0285/SA-59): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/19/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 19, 2002 April 19, 2002 REPLY TO ATTN OF: KEP SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-59) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis Covington/ Raver Paul / Paul Alston 230 and 500 kV Transmission line Corridor ROW 48/2 to 70/6 and 1/1 to 13/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with a corridor width of 250 to 442 feet. Location: The ROW is located in Thurston County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

295

(DOE/EIS-0285/SA-07): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/18/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2001 18, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-07) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management on section of three ROWs. The ROWs include selected sections of the McNary Powerhouse, the present and proposed new sections of the McNary-Roundup and the McNary Switchyard South Transmission lines. Location: All ROW are located east Umatilla, OR., all being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

296

Monitoring and Managing PDSF Jobs  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring and Managing Jobs Monitoring and Managing Jobs Commonly Used Commands Action How to do it Comment Get a summary of all batch jobs sgeusers Shows a tally of all jobs for...

297

Appendix 8 - iManage Change Management Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

not impact integration between iManage systems. These changes are managed by the specific project change control procedures. If there is uncertainty that a proposed change affects...

298

International action plan on the radiation protection of patients  

Science Journals Connector (OSTI)

......implementation of the Action Plan, and to make proposals...The steering panel reviews progress and makes additional...International Action Plan on the Radiation Protection...financial base or have a regulatory requirement to produce...International action plan for the radiological......

Madan M. Rehani; Ola Holmberg; Pedro Ortiz López; Fred Mettler

2011-09-01T23:59:59.000Z

299

EERE PROJECT MANAGEMENT CENTER NEPA DETTIUlIIN .... TION PROJECT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago u.s. DEP .... RTIIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETTIUlIIN .... TION PROJECT TITLE: Chicago Climate Action Plan Advanced Transportation Technologies Initiative STATE: IL Funding Opportunity Announcement Number nla Procurement Instrument Number DE-FG3&-060860S2 NEPA Control Number GFO-G086052-001 Page 1 of2 ClD Number G086052 Based on my review oftbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I bave made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 65.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

300

Energy management  

SciTech Connect

This paper is a review of the Department of Energy's (DOE) Contractor Purchasing System Review (CPSR) Program, which oversees the extensive subcontracting activities of the Department's management and operating (M and O) contractors. This review is part of a special GAO audit effort to help ensure that areas vulnerable to fraud, waste, abuse, and mismanagement are identified and that adequate corrective actions are taken. This effort focuses on 16 areas, one of which is DOE contractor oversight. This report describes the subcontracting deficiencies occurring at DOE, identifies shortcomings in DOE's CPSR Program, and discusses the corrective actions that DOE has committed to take in its CPSR Program in response to these findings.

Glenn, J.

1991-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

(DOE/EIS-0285/SA-56): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/9/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09, 2002 09, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-56) 2ULRQ $OEUR 2O\PSLD 5HJLRQDO 0DQDJHU Proposed Action: Vegetation Management for the following electric yards located in the Ross District: Cape Horn North Bonneville Stevenson Carson Underwood Troutdale Cascade Locks Acton Ross 345kV and J.D. Alcoa Sifton St. Johns Ostrander McLoughlin Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to maintain a weed-free environment in the electrical substations located within the Olympia Region's Ross District. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical

302

Categorical Exclusion Determination Form Program or Field Office: Office of Legacy Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Office of Legacy Management Project Title: Routine monitoring, maintenance, and administrative actions at the Salmon, MS, Site Location: Mississippi Proposed Action or Project Description: American Recovery and Reinvestment Act: D The proposed activities include an annual site visit, annual groundwater and surface water sample collection, the addition of a water access tube to one groundwater monitoring well, and general administrative actions. Categorical Exclusion(s) Applied: 83.1 Site characterization/environmental monitoring A8 Award of contracts for technical supporUmanagement and operation/personal services; A9 Information gathering/data analysis/document preparation/dissemination A 11 Technical advice and assistance to organizations *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFRIO 21 Click Here

303

Building Technologies Office: Take Action to Save Energy in Commercial  

NLE Websites -- All DOE Office Websites (Extended Search)

Take Action to Save Take Action to Save Energy in Commercial Buildings to someone by E-mail Share Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Facebook Tweet about Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Twitter Bookmark Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Google Bookmark Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Delicious Rank Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Digg Find More places to share Building Technologies Office: Take Action to Save Energy in Commercial Buildings on AddThis.com... About Take Action to Save Energy Manage Organizational Energy Use Design & Construct New Buildings

304

Energy Action Month | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Outreach » Energy Action Month Services » Outreach » Energy Action Month Energy Action Month October 7, 2013 - 4:43pm Addthis The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote energy- and water-saving practices in Federal facilities. This year's outreach materials call on Federal employees to take action and empower leadership, innovation, and excellence to realize a secure energy future. Empower Leadership One individual can empower collaboration and teamwork that can spark change and result in sustainable solutions. Empower coworkers, groups, and entire organizations to lead by example, build momentum, and make a difference. Empower Innovation Innovative thinking can guide strategic sustainability plans, generate new best practices, and accelerate the deployment of clean energy technologies.

305

ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE  

Office of Legacy Management (LM)

ADDENDUM TO ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE PROPOSED INTERIM REMEDIAL ACTIONS FOR FY 1983-85 ACCELERATED PROGRAM (1984 VICINITY PROPERTIES CLEANUP) Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois July 1984 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee CONTENTS Page SUMMARY OF PROPOSED ACTION AND RELATED ACTIVITIES ........... 1 HISTORY AND ENVIRONMENTAL SETTING ........................ 4 RADIOLOGICAL CONTAMINATION AND NEED FOR PROPOSED ACTION ........ 4 Property A .. . . . . . . . . . . . . . . . .. . . . . . . 6 Property C' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Property H ...... ............. ... 7 Property H' . . . . . . . . . . . . . . . . . . .. . . . . . . . . 7 Property L ..... ...... .

306

Corrective Action Investigation Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Air port Strainer Box, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan contains the US Department of Energy, Nevada Operation Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 230/320 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 230 consists of Corrective Action Site (CAS) 22-03-01, Sewage Lagoon; while CAU 320 consists of CAS 22-99-01, Strainer Box. These CAUs are referred to as CAU 230/320 or the Sewage Lagoons Site. The Sewage Lagoons Site also includes an Imhoff tank, sludge bed, and associated buried sewer piping. Located in Area 22, the site was used between 1951 to 1958 for disposal of sanitary sewage effluent from the historic Camp Desert Rock Facility at the Nevada Test Site in Nevada. Based on site history, the contaminants of potential concern include volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPH), and radionuclides. Vertical migration is estimated to be less than 12 feet below ground surface, and lateral migration is limited to the soil immediately adjacent to or within areas of concern. The proposed investigation will involve a combination of field screening for VOCs and TPH using the direct-push method and excavation using a backhoe to gather soil samples for analysis. Gamma spectroscopy will also be conducted for waste management purposes. Sampling locations will be biased to suspected worst-case areas including the nearby sludge bed, sewage lagoon inlet(s) and outlet(s), disturbed soil surrounding the lagoons, surface drainage channel south of the lagoons, and the area near the Imhoff tank. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, Nevada Operations Office

1999-06-10T23:59:59.000Z

307

Corrective Action Investigation Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operation Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 230/320 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 230 consists of Corrective Action Site (CAS) 22-03-01, Sewage Lagoon; while CAU 320 consists of CAS 22-99-01, Strainer Box. These CAUs are referred to as CAU 230/320 or the Sewage Lagoons Site. The Sewage Lagoons Site also includes an Imhoff tank, sludge bed, and associated buried sewer piping. Located in Area 22, the site was used between 1951 to 1958 for disposal of sanitary sewage effluent from the historic Camp Desert Rock Facility at the Nevada Test Site in Nevada. Based on site history, the contaminants of potential concern include volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPH), and radionuclides. Vertical migration is estimated to be less than 12 feet below ground surface, and lateral migration is limited to the soil immediately adjacent to or within areas of concern. The proposed investigation will involve a combination of field screening for VOCs and TPH using the direct-push method and excavation using a backhoe to gather soil samples for analysis. Gamma spectroscopy will also be conducted for waste management purposes. Sampling locations will be biased to suspected worst-case areas including the nearby sludge bed, sewage lagoon inlet(s) and outlet(s), disturbed soil surrounding the lagoons, surface drainage channel south of the lagoons, and the area near the Imhoff tank. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

US DOE/Nevada Operations Office

1999-06-10T23:59:59.000Z

308

Princeton Plasma Physics Laboratory NSTX Experimental Proposal  

E-Print Network (OSTI)

in a "fixed wall" device is key for management of plasma-wall (i.e., divertor) interactions. In particular-H transition. The early times after this transition being generally blob-less. The proposed experiment intends

Princeton Plasma Physics Laboratory

309

ARRA Proposed Award: Energy Technology Assistance Program  

E-Print Network (OSTI)

ARRA Proposed Award: Energy Technology Assistance Program Statewide Program ­ covering Greater Sub contractors: California Lighting Technology Center California Labor Management Cooperation multiplier) Partnering Clean Energy Workforce Training Programs: Sacramento Employment Training Agency

310

Environmental impacts of proposed Monitored Retrievable Storage  

SciTech Connect

This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

Not Available

1985-12-17T23:59:59.000Z

311

California Energy Commission PROPOSED AMENDED STANDARDS  

E-Print Network (OSTI)

California Energy Commission PROPOSED AMENDED STANDARDS NONRESIDENTIAL ACCEPTANCE TESTING ENERGY COMMISSION Martha Brook Project Manager & Principal Author Eurlyne Geiszler Staff members of the California Energy Commission prepared this report. As such, it does not necessarily

312

Transformational Energy Action Management (TEAM) Wireless Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Jose Gutierrez, Emerson Eric Starosky, Eaton Doug Hicks, Honeywell Jerry Martocci, Johnson Controls Tom Sudman, Digital AV Randal Bowense, GE Key Benefits of Seminar Re-examine...

313

Program or Field Office: Office of Legacy Management U.S. Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Office of Legacy Management U.S. Department of Energy Categorical Exclusion Determination Form Office of Legacy Management * Project Title and 1.0 . No.: Monitoring , maintenance, environmental and biological sampling , and administrative actions on Amchitka and Adak Islands, Aleutian Islands, Alaska. LM No.16-11 . Location: Amchitka and Adak Islands, Alaska Proposed Action or Proj ect Description : This determination form provides the results of an evaluation of potential impacts related to various monitoring and maintenance actions on Amchitka Island and to non-routine collection of environmental and biological samples on and offshore of Amchitka and Adak Islands. DOE is committed to the collection of environmental and biological samples to test

314

USDA Forest Service Gen. Tech. Rep. PSW-GTR-203. 2007. 55 Integrating Stand Density Management With  

E-Print Network (OSTI)

that guide project design are essentially characterized by a canopy cover lower limit. Depending on landUSDA Forest Service Gen. Tech. Rep. PSW-GTR-203. 2007. 55 Integrating Stand Density Management fuels is possible and can be smoothly integrated with most fuel reduction proposed actions. This paper

Standiford, Richard B.

315

Strategic Energy Management  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) See Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

316

(DOE/EIS-0265/SA-88): Supplement Analysis for the Watershed Management Program EIS (08/26/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2002 6, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-88) John Baugher, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: John Day Watershed Restoration (2002-2003) Project No: 1998-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.2 Water Measuring Devices; 4.10 Water Conveyance Pipeline; 4.25 Consolidate / Replace Irrigation Diversion Dams; 6.5 Water Supply: Pipeline. Location: Canyon City, Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Confederated Tribes of the Warm Springs Reservation of Oregon.

317

DOE/EIS-0265-SA-163: Supplement Analysis for the Watershed Management Program EIS (8/04/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-163) John Baugher TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: John Day Watershed Restoration Program Project No: 1998-018-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 4.2 Water Measuring Devices 4.10 Water Conveyance Pipeline, 4.25 Consolidate/Replace Irrigation Diversion Dams, 6.5 Water Supply: Pipeline, 6.10 Access: Fencing; 8.13 Stand Thinning; 8.15 Manage Stands to Enhance Snowpack Location: Sites within the John Day River Watershed, in Wheeler County and Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Confederated Tribes of the Warm

318

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-59) (8/14/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2001 14, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-59) David Byrnes Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Reestablish Safe Access into Tributaries of the Yakima Subbasin, Tucker Creek Fish Passage Project Project No: 98-034-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish Passage Enhancement - Fishways/Screening, 1.16 Spawning Habitat Enhancements, 1.17 Rearing Habitat Enhancements, 1.5 Install Grade Control Structures and Check Dams. Location: Tucker Creek, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Fisheries

319

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

320

DOE/EA-0826: Revised Finding of No Significant Impact for the Natural Resource Management Activities at the Savannah River Site (04/22/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact Finding of No Significant Impact for the Natural Resource Management Activities at the Savannah River Site Agency: U.S. Department of Energy Action: Revised Finding of No Significant Impact Summary: The Department of Energy (DOE) Savannah River Operations Office (SR) prepared an environmental assessment (EA) (DOE/EA-0826) in 1993 to analyze the potential environmental impacts of continued management of natural resources at the Savannah River Site (SRS) located near Aiken, South Carolina. Based on the analyses in the EA, DOE-SR determined that the proposed action was not a major Federal action significantly affecting the human environment within the meaning of NEPA, and for that reason issued a finding of no significant impact (FONSI) dated July 15, 1993. The proposed action in that EA was based upon

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The Standards Actions, January 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Actions Resistance of HVAC Air Ducts and Fittings (new standard); comments due February 6, 1996. * ISO/ASQC A3534-1, Statis- tics - Vocabulary and Sym- bols - Probability and Gen- eral Statistical Terms (new standard); comments due January 26, 1996. * ISO/ASTM/ASQC/NSF 14004, Environmental management systems - General guidelines on principles, systems and Technical Standards Program Document Status as of 12/31/95 Documents Recently Published The Technical Standards Program is sponsoring a project at OSTI to place all DOE technical standards (i.e., standards and handbooks) on the Internet. To date, 57 DOE technical standards have been placed on the Internet at the following address: http://apollo.osti.gov/ html/techstds/ techstds.html The following DOE technical standards have recently

322

NHMFL Emergency Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

323

(DOE/EIS-0285-SA-117): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - (Ross Complex) 1/16/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2003 16, 2003 REPLY TO ATTN OF: KEP/CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-117- (Ross Complex) Paul Martin TFHV/CSB2 Proposed Action: Vegetation Management for the non-electric portions of the Bonneville Power Administration's Ross Complex Location: The Ross Complex is located at 5411 NE Highway 99, Vancouver, Clark County, Washington in the BPA Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage and maintain grounds and landscaping in the non-electrical portions of the Ross Facility. Vegetation management at the Facility shall include: 1) bare ground management of graveled storage areas, perimeter roads and parking

324

Project Management Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance Office of Engineering and Construction Management (OECM) Monthly Project Dashboard Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management Project Definition Rating Index (PDRI) Project Management Institute (PMI) Construction Industry Institute (CII)

325

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

Tracker Tracker Jump to: navigation, search Tool Summary Name: Climate Action Tracker Agency/Company /Organization: Ecofys Sector: Climate Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual Website: www.climateactiontracker.org/ Climate Action Tracker Screenshot References: Climate Action Tracker[1] "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The website provides an up-to-date assessment of individual national pledges to reduce their greenhouse gas emissions. In the framework of the UNFCCC, many countries have put proposals on the table about how much they intend to reduce their greenhouse-gas emissions in both the near and the long term.

326

DOE/EIS-0203-SA-01; Supplement Analysis of the INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Office 850 Energy Drive Idaho Falls, Idaho 83401-1563 November 2002 SUBJECT: Conclusions of the Supplement Analysis of the DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs EIS (1995 EIS) ~ Dear Citizen: The Record of Decision (ROD) for the DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs EIS (1995 EIS) left several decisions concerning INEEL proposed actions outstanding. That is, decisions were deferred .pending further project definition, funding priorities, or appropriate review under NEPA" In May 2000 a team of DOE-ID program representatives and subject area technical specialists (interdisciplinary

327

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research...

328

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the...

329

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Office General User Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS...

330

PROPOSAL PREPARATION INSTRUCTIONS  

NLE Websites -- All DOE Office Websites (Extended Search)

the escalation factors used for each fiscal year, the source of the proposed escalation rates, and the rationale as to why the proposed escalation rates are reasonable. (l)...

331

Scientific Partner Proposals | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Partner Proposals One Scientific Partner's Experience Ron Heeren, with AMOLF in The Netherlands, collaborated with EMSL scientists through a Scientific Partner Proposal. As a...

332

(DOE/EIS-0285/SA-06): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/13/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4/13/01 4/13/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-06) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation. Location: The pastureland is adjacent to the Walla Walla Substation and is located east and north of the fenced substation, all within the BPA property boundary. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to apply selected herbicides to control annual weeds that are competing with native grasses that were seeded two years ago. Herbicides will also

333

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

334

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25)(9/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2001 5, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) Elizabeth Johnson - TFR/The Dalles Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along selected ROW sections of the Ostrander-Pearl transmission line. The ROWs include sections of the Ostrander-Pearl 500 kV line; the Ostrander-McLoughlin 500 kV line; the Big Eddy-Chemawa 230 kV line and the Big Eddy- McLoughlin 230 kV line. Location: The ROW is located in Clackamas County, Oregon, within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights- of-way and around tower structures that may impede the operation and maintenance of the

335

DOE/EIS-0285-SA-50: Supplement Analysis for the Transmission Vegetation Management Program FEIS (3/15/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/27/01 1 2/27/01 1 United States Government Department of Energy Bonneville Power Administration DATE: March 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-50) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Grizzly-Summerlake (Structures 102/1-104/2) and Grizzly-Captain Jack (Structures 103/1-140/4) Transmission Line Corridors. Location: The project area lies east and northeast Klamath Falls, OR, and is located in Lake and Klamath Counties, Redmond Region. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the rights of

336

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

337

(DOE/EIS-0285/SA-14): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4) 4) Bill Erickson - TFP/ Walla Walla Region Natural Resource Specialist Proposed Action: Vegetation Management at the Teakean Butte Microwave site. Location: Clearwater County, ID, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove 28 danger trees and dense brush from the microwave site in order to provide a 75 -80 foot safety buffer for fire control and Microwave Beam path. The work will protect BPA's investment at the site and provide system reliability. All work will be in accordance with the National Electrical Safety Code and BPA standards. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision

338

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-33)(11/27/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 27, 2001 November 27, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-33) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance

339

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22)(8/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 17, 2001 August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Chief Joseph - Snohomish No.3 and 4 Transmission Line ROW. From STR 94/1 to STR 113/1 Location: The ROW is located in King and Snohomish Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

340

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23)(8/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Schultz - Raver No.1 and 2 from 60/3 to 75/5 and the Olympia - Grand Coulee from 70/2 to 70/5 Transmission Line ROW's. Location: The ROW is located in King County, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and along access roads that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26)(9/11/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2001 11, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management on Reedsport-Fairview #1 Transmission Line Structure 1/5 to 39/4. Location: All ROW are located in Coos and Douglas Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

342

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17)(7/24/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: July 24, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along selected sections of the Schulz - Raver No.1, 2, 3 & 4, Olymplia - Grand Coulee NO. 1 Transmission Line ROW's. Location: The ROW's are located in Pierce and King Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety Code and BPA

343

(DOE/EIS-0285/SA-55): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/12/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2002 2, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-55) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Raver - Paul No. 1 Transmission Line ROW from structure 15/5 to 29/3. The transmission line is a 500 kV line. Location: The ROW is located Pierce County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line, including both Reclaim and Danger Trees. Also, access road clearing will be

344

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 10/22/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 22, 2001 October 22, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-27) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. Location: All ROW are located in Marion, Linn, and Lane Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways, around tower structures, and associated access roads that may impede the operation and

345

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-181- Noxon-Hot Springs/Taft-Hot Springs 39/2 to 44/1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2003 2, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-34) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Asotin Creek Watershed, Washington-Schlee Acquisition Project No: 1996-094-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Asotin County, Washington Proposed by: Bonneville Power Administration (BPA) and Washington Department of Fish and Wildlife (WDFW) Description of the Proposed Action: BPA proposes to fund the acquisition of approximately 8,500 acres consisting of shrub-steppe rangeland, 1,480 acres of Conservation Reserve Program

346

EIS(DOE/EIS-0285/SA-61) Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2002 April 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-61 Tom Murphy - TFS/Bell-1 - Natural Resource Specialist Proposed Action: Vegetation Management along the Bell-Boundary No.3, 84/4 to 96/1 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 100 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Stevens and Pend Oreille County, WA, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-

347

(DOE/EIS-0285/SA-114): Supplement Analysis for the Transmission System Vegetation Management Program EIS (Chehalis-Raymond #1, ADNO 8114) 12/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December December 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-114) (Chehalis-Raymond #1, ADNO 8114) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Chehalis-Raymond #1 115 kV transmission line Location: Project location is within Lewis and Pacific counties, Washington and is within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources

348

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

349

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) (5/20/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) Joe DeHerrera Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Eisminger/ CREP Dike Relocation Project No: 1992-026-01 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 2.1 Maintain Healthy Riparian Plant Communities, 2.3 Creation of Wetlands to Provide Near Channel Habitat and Store Water for Land Use, 2.7 Avoid Exotic Species, 2.4 Provide Filter Strips to Catch Sediment and Other Pollutants, 6.1 Deferred Grazing. Location: Union County, Oregon

350

(DOE/EIS-0265/SA-102): Supplement Analysis for the Watershed Management Program EIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-102) David Byrnes, KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Tributary Access and Habitat Program - Ellensburg Water Company/ Cooke Creek Diversion Project Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.5 Install Grade Control Structures and Check Dams; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.15 Fish Passage Enhancement - Fishways; 2.1 Maintain Healthy Riparian Plant Communities; 4.10 Water Conveyance - Pipeline; 4.20 Water

351

DOE/EIS-0265-SA-166: Supplement Analysis for the Watershed Management Program EIS (8/6/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2004 6, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-166) Jay Marcotte Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Idaho Model Watershed Habitat Projects - Coleman Creek Fish Passage Restoration Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection Using Bioengineering Methods, 1.13 Culvert Removal/Replacement to Improve Fish Passage, 1.16 Spawning Habitat Enhancements, 2.6 Native Seed Inventories, 2.7 Avoid Exotic Species, 2.9 Mechanical Vegetation Removal, 4.2 Water Measuring

352

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-69) (11/15/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS, (DOE/EIS-0265/SA-69) Linda Hermeston - KEWL Fish and Wildlife Project Manager Proposed Action: Improvement of Anadromous Fish Habitat and Passage in Omak Creek Project No: 2000-001-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.6 Install Large Woody Debris Structures; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.9 Structural bank protection using bioengineering methods; 1.13 Culvert Removal/Replacement to improve fish passage; 1.16 Spawning habitat enhancements; 1.17 Rearing habitat enhancement.

353

EMSL: Proposal Extensions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Summary/Extension for Fiscal Year 2014 Proposal Summary/Extension for Fiscal Year 2014 Published December 2013. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo Summaries of the work performed with EMSL resources are required for all user projects (see details below) and should be submitted through the User Portal. For projects open for one year or less, these summaries are due when the proposal closes. For projects that are submitted in response to a Call for Proposals and are eligible for yearly extensions, summaries are

354

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2002 , 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91) Tom Morse, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat (Evans Creek Culvert Replacement) Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.13 Culvert removal/replacement to improve fish passage, 2.1 Maintain healthy riparian plant communities, 2.4 Provide filter strips to catch sediment and other pollutants, 2.6 Native seeds inventory, 2.7 Avoid exotic species, 7.2 Install hydraulic structures at low streamflows, 7.3 Minimize erosion

355

Overview - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Help > Data Management Help > Data Management Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Overview Welcome to the data management pages for data providers to the ORNL Distributed Active Archive (DAAC). These pages provide an overview of data management planning and preparation and offer practical methods to successfully share and archive your data. Plan - write a short data management plan while preparing your research proposal, Manage - assign logical, descriptive file names, define the contents of your data files, and use consistent data values when preparing

356

Guidance Regarding Actions That May Proceed During the National Environmental Policy Act (NEPA) Process: Interim Actions (6/17/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exhibit 3 Exhibit 3 Steps to Follow for Determining Whether Actions May Proceed During the NEPA Process: Interim Actions Would the Interim Action Prejudice the Ultimate Programmatic Decision (i.e., would it tend to determine subsequent development or Limit alternatives)? Is the Proposed Interim Action Within the Scope of a Programmatic or Project-Specific EIS that is Being Prepared? Is the EIS Programmatic in Nature? (If proposed interim action is covered by a CX or EA/FONSI,see footnote 4, page 4, of text) Provisions of 40 CFR 1506.1 Do Not Apply: Follow Normal DOE NEPA Review and Documentation Procedures No Yes No No Would the Interim Action Have An Adverse Impact? Would the Interim Action Limit the Choice of Reasonable Alternatives (e.g., by level of resources

357

Guidance on NEPA Review for Corrective Actions under the Resource  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Review for Corrective Actions under the Resource NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

358

Guidance on NEPA Review for Corrective Actions under the Resource  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance on NEPA Review for Corrective Actions under the Resource Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

359

Request for Proposal for Testing and Inspection Services RFP...  

NLE Websites -- All DOE Office Websites (Extended Search)

8 National Renewable Energy Laboratory Managed and Operated by the Alliance for Sustainable Energy, LLC Request for Proposals Number RHB-4-42432 "Service Agreement for Testing and...

360

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EMSL: Proposal Guidance:  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

362

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

363

May 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

364

Business System Management Review  

NLE Websites -- All DOE Office Websites (Extended Search)

P-004 Business System Management Review Process 11_0304Page 1 of 7 P-004 Business System Management Review Process 11_0304Page 1 of 7 EOTA - Business Process Document Title: Business System Management Review Process Document Number: P-004 Rev 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-009, Business System Management Review Template P-004 Business System Management Review Process 11_0304Page 2 of 7 Revision History: Rev. Description of Change A Initial Release 08_0414 Corrective Actions, Preventive Actions, and Improvement Opportunity 09_1124 Edited document for clarity and to better fit the process in use. Added requirement to provide management with

365

DOE Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. The DOE Office of Environmental Management (EM) has put in place a "Roadmap" for Journey to Excellence that sets specific performance expectations for continuous improvements in contract and project management. Following are some highlights of EM's improvement actions over the past five years. In 2006, the National Academy of Public Administration (NAPA) began a study of EM, which included acquisition and project management among its key focus areas. The resultant report from the study,

366

2014 ALCC Proposals Due  

NLE Websites -- All DOE Office Websites (Extended Search)

ALCC Proposals Due February 3, 2014 2014 DOE ALCC Proposals Due February 3 December 23, 2013 by Francesca Verdier (0 Comments) DOE's 2014 call for its ASCR Leadership Computing...

367

CY15 Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

be given to JLF proposals that link to experiments, or proposed experiments, at the x-ray free electron laser facility Linear Coherent Light Source (LCLS) located at the SLAC...

368

General User Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals Print Tuesday, 01 June 2010 09:36 General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS...

369

Resubmitting a Proposal | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

be competing for more limited resources as a General proposal outside of the Call. Assess Peer Review Results Before you choose whether to revise and resubmit your proposal or...

370

CONFIGURATION CHANGE PROPOSAL FORM  

Energy.gov (U.S. Department of Energy (DOE))

This form is used for sharing information on Domain Name Server (DNS) changes, new requirements, modifications or enhancements within the DOE Headquarters Programmatic and Office Management Areas.

371

Fernald Environmental Management Project Director's Findings...  

Office of Environmental Management (EM)

plan describing actions to minimize potential environmental impacts to Paddy's Run, a best management practices (BMP) plan for the control of industrial wastes and other wastes...

372

Adaptive management: a paradigm for remediation of public facilities  

SciTech Connect

Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.

Janecky, David R [Los Alamos National Laboratory; Whicker, Jeffrey J [Los Alamos National Laboratory; Doerr, Ted B [NON LANL

2009-01-01T23:59:59.000Z

373

EE RE PROJECT MANAG EMENT CENTER NEPA DETERr-IINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

>,RTr-lENT OF ENERGY >,RTr-lENT OF ENERGY EE RE PROJECT MANAG EMENT CENTER NEPA DETERr-IINATION Page 1 of2 RECIPIENT:North Carolina Department of Commerce. State Energy Office STATI<:: NC PROJECT TITLE: Energy Conservation Programs in Transportation - Sandhills Community Coliege Funding Opportunity Announcement Number Procurement Instrument Number DE-EEOOOO771 NEPA Control Number GFO-OOOO771-014 em Number o Based on my review or the infonnation concerning the proposed action, as NEPA Compliance Officer (autboriud under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

374

DEPARTMENT OFENFRGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIU.UNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFENFRGY OFENFRGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIU.UNATION RECIPIENT:$tate of Oklahoma PROJECT TITLE : gridSMART * Public Service Company of Oklahoma Page 1 of2 STATE: OK Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOOS2 EEOOOO133 GF0-0000133-047 EE133 Based on my review of tbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.lA}.1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to oonserve energy, demonstrate potential energy oonservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

375

ENT OFENFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFENFRGY OFENFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION REel PI ENT:Missouri Department of Natural Resources PROJECf TITLE : Noranda Page 1 of3 STATE: MO Funding Opportunity Announcement Number DE-FOAOOOOS2 Procurement Instrument Number NEPA Control Number CID Number EEOOOO131 EE131 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A),1 have made the following determination : ex, EA, [IS APPENDIX AND NUMBER: Description: B5. 1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy--efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

376

DFP.'\RTMENT OFFNFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DFP.'\RTMENT OFFNFRGY DFP.'\RTMENT OFFNFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION RECIPIENT:County of Lexington PROJECT TITLE: EECBG (S) Page 1 of2 STATE: SC Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number EE0000949 GFO-OOOQ949-001 0 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer- (authorized uDder DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities). and state

377

DEPART~IENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPART~IENT OF ENERGY DEPART~IENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT: Illinois Department of Commerce & Econom ic Opportunity PROJECT TITLE: Edwardsville CUSD 7 Solar Pholovoltaic Project Page 1 of2 STATE: IL Funding Opportunity Announcement Number DE-FOA-OOOOOS2 PrOCUNment Instrument Number NEPA Control Number CID Number o Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and tecrmical

378

DEPARTM ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

u.s. u.s. DEPARTM ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Page 1 of2 STATE: PA PROJECf TITLE : Lehigh County (PA), Geothermal al Trexler Enviromenlal Center -ARRA-EECBG Funding Opportunity AnnOUReement Number DE-FOA-OOOO13 Procurement Instrument Number DE-EEOOOO9361EECBG NEPA Control Number elD Number o Based on my .-eyiew or lbe infor mation concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination : ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actIOns may involve financial and technical

379

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETFRMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETFRMINATION PROJECf TITLE; City of Mesa Reclamation Blower Units STATE: AZ Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number elO Number DE-EE0000840 GFO-o000840-OO2 0 Based on my review of the information concerning ahe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the Indoor concentratIOns of potentially harmful substances. These actions may Involve financial and technical assistance to IndiViduals (such as builders, owners, consultants, designers), organizations (such as utilities), and slate

380

Proposed Evanston Offshore Wind Farm  

NLE Websites -- All DOE Office Websites (Extended Search)

Evanston Offshore Wind Farm Evanston Offshore Wind Farm August 1, 2011 Monday, August 1, 2011 Off Shore Wind Farm FAQ Document available from http://www.greenerevanston.org/ at the Renewable Energy Task Force tab Monday, August 1, 2011 City Manager Commits to City to sign onto Kyoto emissions reduction goals Wind Farm Timeline April 2006 Summer 2007 Fall 2008 February 2008 April 2010 March 2011 July 2011 Network for Evanston's Future proposes joint climate planning effort CGE Formed and Renewable Energy Task Force formed - Wind farm concept begun ECAP passed by City Council with 1st version of proposed Offshore Wind Farm included Offshore Wind Farm RFI unanimously passed by City Council Mayor Tisdahl appointments Committee on the Wind Farm City Council

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Corrective Action Tracking System (CATS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corrective Action Tracking System (CATS) Corrective Action Tracking System (CATS) Corrective Action Tracking System (CATS) The CATS web-based database is used to enter, track, and report the status of corrective actions developed and implemented in the DOE Corrective Action Management Program (CAMP) to effectively resolve and prevent recurrence of reported findings. The web-site includes guidance for accessing, reviewing and editing the database. NOTICE: Because of the potential sensitive nature of some information in Corrective Action Plans (CAPs) that is placed in the Department of Energy (DOE) Corrective Action Tracking System (CATS), DOE is limiting access to the CATS web site. Members of the public cannot access the CATS web site at this time. DOE regrets any inconvenience caused by this decision in

382

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) (10/29/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2001 29, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) Alan Ruger Fish and Wildlife Project Manager Proposed Action: Duncan Creek Channel Rehabilitation Project Project No: 2001-053-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.11 Remove Debris Functioning as Barrier to Passage, 1.16 Spawning Habitat Enhancements, 2.1 Maintain Healthy Riparian Plant Communities, 2.9 Mechanical Vegetation Control. Location: Skamania County, Washington. Proposed by: Bonneville Power Administration (BPA), and the Washington State Department of Fish and Wildlife (WDFW)

383

General User Proposal Scores  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposal Scores General User Proposal Scores General User Proposal Scores Print Tuesday, 01 June 2010 10:34 Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beamtime requests exceed available beamtime, a cutoff score is assigned after which no beam time is allocated. proposal scores Beam Time Cutoff Scores for the Current Cycle The table below lists the percent of beam time shifts allocated/requested for each beamline, and the cutoff scores, below which no beam time was assigned.

384

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-Custer-Intalco #2) 4-Custer-Intalco #2) Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Custer-Intalco #2 230 kV transmission line located from tower structure 1/1 to 7/5. Location: Project location is in BPA Snohomish Region in Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way, along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

385

(DOE/EIS-0285/SA-125): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/18/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 (Echo Lake-Maple Valley #1 [Mile 1-9], Adno 8258) 5 (Echo Lake-Maple Valley #1 [Mile 1-9], Adno 8258) Don Atkinson - TFN/SNOHOMISH Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Echo Lake - Maple Valley #1 500 kV transmission line located from tower structure 1/1 to 9/2. Location: Project location is entirely within King county, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

386

(DOE/EIS-0285/SA-11): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1) 1) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 150 feet. The proposed work will be accomplished in selected sections along the entire transmission line corridor. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with

387

U.S. DEPARTME NT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT CENTER MANAGEMENT CENTER NFPA DETERMINATION Page 1 of 1 RECIPIENT:OK Department of Commerce STATE : OK PROJECT TITLE: City of Moore, OK EECBG eNG Project Modification· Sanitation Truck Purchase funding Opportunity Announcement Number DE EEOOOOO13 Procurement Instrument Number DE EEOOOOO13 NEPA Control Nu mber em Number o Based on my review oflhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.1A),1 have made the (ollowlng dete rmination: ex, EA, EIS APPENDIX AND NUMBER: Description: 95.1 Actions to conserve energy. demonstrate potentia! energy conservation , and promote energy-efficiency thaI do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

388

Management Activities for Retrieved and Newly Generated Transuranic Wastes Savannah River Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 WL 253648 (F.R.) 8 WL 253648 (F.R.) NOTICES DEPARTMENT OF ENERGY Finding of No Significant Impact; Transuranic Waste Management Activities at the Savannah River Plant, Aiken, SC Tuesday, August 30, 1988 *33172 AGENCY: Department of Energy. ACTION: Finding of No Significant Impact. SUMMARY: The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -0315, for transuranic (TRU) waste management activities at DOE's Savannah River Plant (SRP), including the construction and operation of a new TRU Waste Processing Facility. Based on analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact

389

u.s. DEPARTl\oIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

oIENT OF ENERGY oIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIUvIINATION RECIPIENT:Golden Triangle Regional Solid Waste Management Authority PROJECT TITLE: EEC8G - Golden Triangle Power Plus Project page 1 ot L STATE: MS Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOO013 DE-EE0000763 GFO-O000763-003 0 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order45I.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

390

u.s. DEPARThlENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT CENTER MANAGEMENT CENTER NEPA DETERMINATION RlCIPJENT:City of Bakersfield· EECBG PROJECT TITLE: City of Bakersfield 1 mega-watt solar energy facility at wastewater plant 3 Page 1 on STATE: CA Funding Opportunity Announc:trntnt Nurnbfor Procun~mcnt Instrument Number NEPA Control Number em Number EECBGIDE·FOA.QOOOO13 DE-EE0000862 G010337 Based on my nview oftbe inCormation (oDeeming the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the (ollowing determination: ex, EA, EIS APPENDlX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

391

.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERlIIINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE PROJECT MANAG EERE PROJECT MANAG EMENT CENTER NEPA DETERlIIINATION R[CIPIENT:Nevada State Office of Energy Page 1 of3 STATE: NV PROJECT TITLE: Renewable Energy and Energy Efficien cy Revolving Loan Program · Avatar Energy - Desert Hills Dairy # 2 Funding Opportunity ,'nnOllnrement Number DE-FOA-OOOOOS2 Procurement Instrument Number DE-EE.(l()()()084 NEPA Control Number elD Number GF0..(X)()()()84-01Q EE84 Based on my review oftbt information concerning the proposed action, 3S NEPA ComplillnC't Offi<:e:r (authorized undcr DOE Order 451.IA), I have made the following determination: ex, EA , [IS APPENDIX AND NUMBER; Description: 85.1 Actions to conserve energy. demonstrate potential energy conservation, and promote energy-efficiency th at do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

392

u.s. DEPARTIIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA D  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT CENTER MANAGEMENT CENTER NEPA D FTElUvIINATION RECIPIENT:Ohio Energy Office, Ohio Department of Development PROJECT TITLE : Making Efficiency Work Page 1 of3 STATE: OH Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-000052 DE-EE00165 GF0-09-142-003 GOO Based on my review of the information concerning the proposed action, as NEP A Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination : ex. EA, EIS APPENDIX AND NUMBER: Description : B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

393

U.S. DEPARTlIIENT OF ENERGY EERE PROJECT MANAG EMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAG MANAG EMENT CENTER NEPA DETERlIJINATION REC)PIENT;Louisiana DNR ** UL-UCLECO's Solar Thermal Power Plant Installation PROJECT TITLE: Recovery Act -. State Energy Program Page I of2 STATE: LA Funding Opportunity Announcement Number DE-FOA-OOOOOS2 Prl)(unment Instrument Number EEOOOO124 NEPA Control Number em Number o Baud on my review or the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA). I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially hannful substances. These actions may involve financial and technical

394

U.S. DEPARTlVIENT OF ENERGY (1.".01) EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(1.".01) EERE PROJECT MANAGEMENT CENTER (1.".01) EERE PROJECT MANAGEMENT CENTER NEPA DETERJMINATION RECIPIENT:Oklahoma Municipal Power Authority STATE: OK PROJECT OKLAHOMA SEP ARRA - OMPA Large System Application Request N TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000052 DE-EE0000133 GfO - QJOOi]3 -0d-.l 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

395

EA-1870: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

70: Mitigation Action Plan 70: Mitigation Action Plan EA-1870: Mitigation Action Plan Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The Department of Energy (DOE) issues this Mitigation Action Plan (MAP) in conjunction with its Finding of No Significant Impact as to the department's proposed action of providing costshared funding for the Utah Coal and Biomass Fueled Pilot Plant Project. Based on the analyses in the Environmental Assessment (DOE/EA-1870), DOE determined that its proposed action allowing Viresco Energy, LLC (Viresco) to use federal funding to design, construct and operate a coal and biomass gasification pilot plant (pilot plant) - would not result in any significant environmental impacts. The pilot plant would evaluate the technical feasibility of using steam hydrogasification to convert coal and biomass (such as agricultural

396

EAC Recommendations for DOE Action Regarding Development of the Next  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of the Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System, approved at the October 15-16, 2012 EAC Meeting. EAC Recommendations for DOE Action on the Development of the Next Generation Grid Operating System - October 17, 2012 More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2012 - Monday, October 15, 2012 Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western

397

(DOE/EIS-0285/SA-123): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/20/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2003 20, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123 Malin-Hilltop Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Malin-Hilltop (Structures 20/5-29/1). Location: The project area lies to the southeast of Klamath Falls, OR, and is located in Modoc County, California. Proposed by: Bonneville Power Administrationn (BPA) Description of the Proposed Action: Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on

398

(DOE/EIS-0285/SA-112): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Ross-Alcoa 1&2, 3&4 and Bonneville-Alcoa 1&2) 10/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October October 15, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112-Ross-Alcoa 1&2, 3&4 and Bonneville Alcoa 1&2. Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV. Proposed by: Bonneville Power Administration (BPA). Location: Project location is within Clark County, Washington and is within the Olympia Region. Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: See the attached checklists

399

Draft 2009 ISRP Programmatic Habitat Project Proposal 1 Programmatic Proposal for  

E-Print Network (OSTI)

assistance and review in recovery planning and in the development of regional monitoring and evaluation Proposer Yakama Nation Fisheries Resource Management Short Description Upper Columbia Habitat Restoration of supporting sustainable populations. Towards achieving this goal, the Yakama Nation proposes to begin

400

Ecological risk assessment benefits environmental management  

SciTech Connect

The ecological risk assessment process in its ideal form is an unbiased approach for assessing the probability of harm to the environment as a consequence of a given action. This information can then be combined with other societal values and biases in the management of such risks. However, as the process currently is understood, decision makers often are accused of manipulating information in order to generate decisions or achieve buy in from the public in support of a particular political agenda. A clear understanding of the nature of the risk management process can help define areas where information should be free from social or personal bias, and areas where values and judgments are critical. The authors do not propose to discuss the individual`s decision-making process, but rather to address the social process of risk communication and environmentally-related decision-making, identifying which parts of that process require bias-free, scientifically generated information about the consequences of various actions and which parts need an understanding of the social values which underlie the informed choices among those possible actions.

Fairbrother, A.; Kapustka, L.A.; Williams, B.A. [Ecological Planning and Toxicology, Inc., Corvallis, OR (United States); Glicken, J. [Sandia National Labs., Albuquerque, NM (United States)

1994-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

DOE/EIS-0285-SA-138: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Raver-Echo Lake #1) (4/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 (Raver-Echo Lake #1 8 (Raver-Echo Lake #1 Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Raver - Echo Lake #1 500 kV transmission line located from tower structure 4/1 to 13/1. Location: Project location is within King County, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way. BPA proposes to clear along access roads and remove danger trees outside the right-of-way where appropriate. Project is to remove vegetation that may impede the operation and maintenance of the subject transmission line. See Section 1.1 through 1.4 of the attached checklists for a complete description of the proposed action.

402

Safety Management Functions, Responsibilities, and Authorities Manual  

Directives, Delegations, and Requirements

This Manual defines safety management functions, responsibilities, and authorities for DOE senior management with responsibilities for line, support, oversight, and enforcement actions. Canceled by DOE M 411.1-1A. Does not cancel other directives.

1997-10-08T23:59:59.000Z

403

DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Documents Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011) Second Five-Year Review Report for the Rocky Flats Site Corrective Action Decision/Record of Decision for Rocky Flats Plant (USDOE) Peripheral Operable Unit and Central Operable Unit Rocky Flats Environmental Technology Site Proposed Plan Present Landfill Monitoring and Maintenance Plan

404

ARM - Submitting Proposals : Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

405

Management Plan Management Plan  

E-Print Network (OSTI)

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

406

NETL: Unsolicited Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) as outlined in the link below which includes all DOE Program Research Areas. The...

407

Proposal Opportunities | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Collaborative Science Initiative). Proposals are encouraged that couple experiments with theory, modeling or simulation, and access is granted beginning October 1 following award...

408

2015 Electricity Form Proposals  

Annual Energy Outlook 2012 (EIA)

include Congress, other government agencies, state governments, business and industry, private analysts and forecasters, and the general public. The proposed form was announced to...

409

SPPR Group Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Proposal June 23, 2010 Agenda Purpose of Meeting Presenters Background Information  Three Terminal Plan & Market Access  Business Case  Transmission Infrastructure Program ED5-Palo Verde Project Potential Rate Impacts Discussion / Comments 2 Purpose of Meeting Provide background information Share the SPPR Group's current proposal and how it might affect Parker-Davis Project (P-DP) customers Obtain your feedback on the proposal 3 Presenters Background Information - Todd Rhoades ED5-PV Project Description - Todd Rhoades Project Marketability - John Steward Project Cost & Financing - Jack Murray Potential Rate Impacts - Jack Murray Next Steps - Todd Rhoades 4 Three Terminal Plan November 2009 5 Business Case

410

Water security in the Canadian Prairies: science and management challenges  

Science Journals Connector (OSTI)

...action. DMUU approaches are being...resources management-[25...environmental science and decision...whither water management??. Science 319, 573-574...1126/science.1151915...alternative approach to assessing...Resources Management Model (WRMM...

2013-01-01T23:59:59.000Z

411

October 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program

412

Standards Actions, July 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Program Document Status 07-01-2002 Activity Summary In Conversion - 4 In Preparation - 46 Out for Comment - 14 Published this Month - 2 5-year Review Status Revision in Progress - 11 Reaffirmation in Progress - 12 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 19 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Re- cently Sent for Coordination 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- July 2002 Standards Actions DOE Technical Standards Projects Initiated

413

NNSA PERSONNEL SECURITY CLEARANCE ACTION REQUEST Required: SUBJECT INFORMATION  

NLE Websites -- All DOE Office Websites (Extended Search)

PERSONNEL SECURITY PERSONNEL SECURITY CLEARANCE ACTION REQUEST Required: SUBJECT INFORMATION Contractor Federal Name (Last, First, Middle): Suffix: Date of Birth: Social Security Number: Place of Birth (city and state/country): Citizenship(s): Email Address: Employer (legal name): Job Title: Required: LOCATION/BILLING Work Location: Contracting Office Location/SON: Prime Contract Number: Sub-contract Number: Facility Code: Employer Code: Required: CLEARANCE ACTION Requested Action(s): Clearance Level: (for employer/contract above) Clearance History Never held a clearance Previously held Currently holds Key Management Personnel (KMP)? Human Reliability Program (HRP)? PERSONNEL SECURITY USE ONLY: DOE Clearance: Special Access Program (SAP)? Yes No CLEARANCE JUSTIFICATION NARRATIVE

414

(DOE/EIS-0265/SA-100): Supplement Analysis for the Watershed Management Program EIS 11/25/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 25, 2002 November 25, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-100) Tracey Yerxa TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Oregon Fish Screening Project, Screen Replacements 2003 Project No: 1993-066-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection; 1.9 Structural Bank Protection using Bio Engineering Techniques; 1.10 Structural Bank Protection using Engineering Structures; 1.14 Reduce Scour and Deposition at Hydraulic Structures; 1.15 Fish Passage Enhancement-Fishways; 1.16 Spawning Habitat Enhancements;

415

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-66) (10/4/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04, 2001 04, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-66) John Baugher - KEW-4 Tom Morse - KEW-4 Fish and Wildlife Project Managers Proposed Action: Water Right Acquisition Program Project No: 2001-023-00 (Fifteenmile Subbasin Water Right Acquisition Program) 1999-008-00 (Columbia Plateau Water Right Acquisition Program) 2001-056-00 (Trout Creek 2001 Streamflow Enhancement) 2001-069-00 (John Day Basin Stream Enhancement Project, Summer 2001) Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.18 Purchase / Negotiate Water Right; 4.19 File for Instream Water Right.

416

Implementation of the Formerly Utilized Sites Remedial Action Program:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation of the Formerly Utilized Sites Remedial Action Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) More Documents & Publications Recent Developments in DOE FUSRAP

417

November 2013 ANALYSIS OF RAW ACTIONS ADDRESSING RFS  

E-Print Network (OSTI)

environmental resource areas for the proposed RAW actions associated with RFS contamination described in SectionNovember 2013 5-1 CHAPTER 5 ANALYSIS OF RAW ACTIONS ADDRESSING RFS CONTAMINATION This chapter discusses the environmental setting, impacts, and mitigation measures for the 14 fully evaluated

Lee, Jason R.

418

Chapter 1 Purpose of and Need for Action  

NLE Websites -- All DOE Office Websites (Extended Search)

and Acronyms. Chapter 1 Purpose of and Need for Action Bonneville Power Administration (BPA) is proposing to build a 500-kilovolt (kV) lattice-steel tower transmission line that...

419

Guide for the Submission of Unsolicited Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

GUIDE FOR THE SUBMISSION OF GUIDE FOR THE SUBMISSION OF UNSOLICITED PROPOSALS The National Energy Technology Laboratory (NETL), Pittsburgh Office has operational responsibility of the DOE Unsolicited Proposal (USP) Program. All unsolicited proposals should be forwarded by Email to John N. Augustine at DOEUSP@NETL.DOE.GOV who will serve as the single point of contact for all Department of Energy (DOE) unsolicited proposals. Please direct all unsolicited proposals, abstracts and correspondence to: John N. Augustine, Mail Stop 921-107 Unsolicited Proposal Manager U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 Email: DOEUSP@NETL.DOE.GOV -1- TABLE OF CONTENTS Page Introduction .................................................................................................................................... 3

420

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

May 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

422

Doctoral school COURSE PROPOSAL  

E-Print Network (OSTI)

Doctoral school COURSE PROPOSAL ED SPIM / Course proposal Page 1/2 2013 Title: The Web of data This course will give an overview of the principles of Linked Data along with the Web of Data, as it emerged architectures. This course also presents the concepts and definitions related to the Semantic Web (or Web

Jeanjean, Louis

423

Callfor2011 Grant Proposals  

E-Print Network (OSTI)

Callfor2011 Internship Grant Proposals Internship Grant Proposals are due on Monday, February 7, 2011 Communications Communications received an internship grant to estab- lish an internship program in the area. School of Family Life Anthropology Health Sciences Past Internship Grant Spotlights The School

Martinez, Tony R.

424

DOE Standards Actions, November 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Projects Canceled DOE Projects Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Worker Protection for Uranium Facilities, Project Number SAFT-0058; Peter O’Connell, EH-52; 301-903-5641, Peter .O’Connell@eh.doe.gov. This project was superceded by Guide of Good Practices for Oc- cupational Radiological Protec- tion in Uranium Facilities, Project Number SAFT-0072. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with copies for comment. The full text of these documents are available on the Technical Standards Pro- gram (TSP) Web Site at the URL shown at the bottom of this page.

425

The Standards Actions, August 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

standard project was recently can- standard project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Guidelines for Preparing Criti- cality Safety Evaluations at De- partment of Energy Non-Reac- tor Nuclear Facilities, Project Number SAFT-0069; Jerry McKamy, EH-34, 301-903-8031, Jerry. McKamy@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Tritium Handling and Safe Storage, Project Number SAFT-0054;

426

The Standards Action - April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Canceled Projects Canceled The following DOE technical standard project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Seismic Design and Evaluation Guidelines for High-Level Waste Storage Tanks, 6910-0035; Owen Thompson, EM-38, 301- 903-1926, FAX 301-903-7604, Owen.Thompson@em.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Internet Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Stabilization, Packaging, and Storage of Plutonium-Bearing

427

The Standards Actions, February 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

standards project was recently can- standards project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Software Quality Assurance Requirements, Procedures, and Guidelines, Project QCIC-0008; Burton Rothleder, EH-31, 301- 903-3726, FAX 301-903-9523, Burton.Rothleder@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of these documents is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on these documents, please notify your TSM. • DOE Handbook Design Considerations, Project Number EDCN-0001; Richard Stark, EH-31; 301-903-4407, FAX 301-

428

Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

429

Proposal Review Panel Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Descriptions Proposal Review Panel Descriptions To ensure competent scientific review, a proposal may be assigned to a different panel (at the discretion of the Review Panel Chair), or the panel may seek additional ad hoc reviews from other experts. High-Pressure This panel reviews scattering and diffraction proposals that focus on materials at high pressure. Techniques such as (but not limited to) diffraction, nuclear resonant scattering, and inelastic x-ray scattering for materials at high pressure are appropriate for this panel to consider. Instrumentation This panel reviews proposals related to the development of beamline instrumentation, sample environments, x-ray optical components, and/or detectors that are relevant to synchrotron radiation research. This panel

430

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

431

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-83)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2002 19, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-83) John Baugher Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Bear Creek Irrigation Siphon Project Project No: 1993-066-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.8 Bank Protection; 1.9 Structural Bank Protection using Bio Engineering Techniques; 1.10 Structural Bank Protection using Engineering Structures; 1.14 Reduce Scour and Deposition at Hydraulic Structures; 1.15 Fish Passage Enhancement-Fishways; 1.16 Spawning Habitat Enhancements; 1.17 Rearing Habitat Enhancements; 2.1 Maintain Healthy Riparian Plant Communities; 2.4 Provide Filter Strips to

432

Environmental assessment for the Radioactive and Mixed Waste Management Facility: Sandia National Laboratories/New Mexico  

SciTech Connect

The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0466) under the National Environmental Policy Act (NEPA) of 1969 for the proposed completion of construction and subsequent operation of a central Radioactive and Mixed Waste Management Facility (RMWMF), in the southeastern portion of Technical Area III at Sandia National Laboratory, Albuquerque (SNLA). The RMWMF is designed to receive, store, characterize, conduct limited bench-scale treatment of, repackage, and certify low-level waste (LLW) and mixed waste (MW) (as necessary) for shipment to an offsite disposal or treatment facility. The RMWMF was partially constructed in 1989. Due to changing regulatory requirements, planned facility upgrades would be undertaken as part of the proposed action. These upgrades would include paving of road surfaces and work areas, installation of pumping equipment and lines for surface impoundment, and design and construction of air locks and truck decontamination and water treatment systems. The proposed action also includes an adjacent corrosive and reactive metals storage area, and associated roads and paving. LLW and MW generated at SNLA would be transported from the technical areas to the RMWMF in containers approved by the Department of Transportation. The RMWMF would not handle nonradioactive hazardous waste. Based on the analysis in the EA, the proposed completion of construction and operation of the RMWMF does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, preparation of an environmental impact statement for the proposed action is not required.

Not Available

1993-06-01T23:59:59.000Z

433

Rangeland Resource Management for Texans: Why are Goals Important for Natural Resource Management?  

E-Print Network (OSTI)

This publication discusses the need for rangeland resource managers to set goals and then to take the correct actions to achieve those goals....

White, Larry D.; Fox, William E.

2002-04-29T23:59:59.000Z

434

Identify energy-saving actions | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Identify energy-saving actions Identify energy-saving actions Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Provide a seat at the table Share energy goals and progress Identify energy-saving actions Spread the word about how to help

435

Hiring Reform Memoranda and Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0585 0585 October 7, 2010 MEMORANDUM FOR HEADS OF ALL DEPARTMENTAL ELEMEI\lTS HUMAI\l RESOURCES DIRECTORS FROM: MICHAELC. KANE~~~ CHIEF HUMAN CAPITAL ~ c· SUBJECT: IMPROVING DOE RECRUITMENT AND HIRING PROCESSES This is a follow-up to the Deputy Secretary's Memorandum dated October 6, 2010 where he communicated the need to implement the Action Plan developed to improve the recruitment and hiring processes throughout the Department. One of the central tenets of the President's reform efforts and the Department's Action Plan is management's commitment and attention to an efficient and effective hiring process that yields quality employees. This was clearly articulated in the President's Memorandum dated May 11, 2010 where he directed that management be held accountable through the performance evaluation system for their role

436

DOE Technical Standards Program Standards Actions Newsletter  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* * New DOE Standard, Communicating Waste Characterization and DOT Hazard Classification Requirements * Workshops and Events * The Annual Energy Facility Contractors Group Safety Analysis Workshop * 2012 Chemical Safety and Life Cycle Management Workshop * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE April 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ New DOE Standard, Communicating Waste Characterization and DOT Hazard Classification Requirements The Department of Energy (DOE) Office of Environmental Management (EM) has a challenging mission to solve many problems posed by the legacy of the Cold War, including the transportation of unprecedented amounts of contaminated waste,

437

Plan - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

438

Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

NONE

1998-03-01T23:59:59.000Z

439

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

440

(DOE/EIS-0285//SA-80): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (07/01/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SA80 SA80 Rocky Reach - Maple Valley Don Atkinson -- - TFN/Snohomish Bill Erickson -- - TFP/Walla Walla Proposed Action: Vegetation Management for USDA Forest Service Lands Along the Rocky Reach - Maple Valley Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along access roads and around tower structures on USDA Forest Service lands that may impede the operation and maintenance of the subject transmission line. See Section 1of the attached checklist for a complete description of the proposal. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and the vegetation management need. Access roads (only) and tower sites (only) will be treated using non-selective methods

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EIS-0380: Mitigation Action Plan Annual Report | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Mitigation Action Plan Annual Report Mitigation Action Plan Annual Report EIS-0380: Mitigation Action Plan Annual Report Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2012 Mitigation Action Plan Annual Report In Fiscal Year (FY) 2012, the Los Alamos National Laboratory (LANL) Site-Wide Environmental Impact Statement (SWEIS) Project Office focused on tracking and managing mitigation action commitments and reporting. Highlights for FY 2012 include the following: completion and distribution of the FY 2011 SWEIS Mitigation Action Plan Annual Report (DOE 2012), which included a section for the Las Conchas Fire, completion and distribution of the calendar year (CY) 2010 SWEIS Yearbook in April 2012 (LANL 2012a), construction and operation of SERF-E, construction of an institutional

442

Supplement Analysis for the Watershed Management Program EIS and the Hood River Fisheries Project Final EIS(DOE/EIS-0241) (DOE/EIS-0265/SA-62) (9/14/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-62) and the Hood River Fisheries Project Final EIS (DOE/EIS-0241). Thomas Morse Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat Project Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.16 and 1.17 Spawning and rearing habitat enhancements; 2.1 Maintain healthy riparian plant communities; 4.9 Water conveyance: ditch and canal lining; 4.23 Intake and return diversion screens; 1.13 Culvert removal and replacement. Location: Odell, Hood River County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Warms

443

CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

DAVIS, M.

2005-04-01T23:59:59.000Z

444

EA-1592: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1592: Mitigation Action Plan Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant Based on the analysis in the Environmental Assessment prepared for the proposal by the GSA and NNSA, neither the construction nor operation of the selected alternative wouldhave significant environmental impact. This MAP contains mitigation and monitoring commitments for the project, including commitments set in permits for the new facility. Mitigation Action Plan for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant More Documents & Publications EA-1592: Finding of No Significant Impact

445

DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Initiates Enforcement Actions Against 4 Showerhead Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) March 7, 2010 - 3:41pm Addthis The Office of General Counsel has issued a Notice of Proposed Civil Penalty to Hudson-Reed Limited for failing to certify to DOE that showerheads manufactured or distributed within the United States meet the applicable water conservation standards as required by the Energy Policy and Conservation Act (EPCA) and DOE regulations. This Notice of Proposed Civil Penalty proposes payments to the government of $1,920,200. Under federal law, manufacturers of some products covered by EPCA are required to

446

Western Veg Management EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for the Environmental Assessment for the Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest November 2011 Glen Canyon-Pinnacle Peak 345 kV Transmission Lines EPG Vegetation Management Project Draft EA i November 2011 TABLE OF CONTENTS 1 Section 1 - Purpose and Need for Action .................................................................................... 1-1 2 1.1 Introduction and Background ........................................................................... 1-1 3 1.2 Purpose and Need for Action ............................................................................ 1-3 4 1.3 Location and project Area Description ............................................................. 1-3 5

447

Strategic Grant Proposal: Connectivity & Conservation in Marine Fishes Snelgrove et al., PIN 100213 p. 1 of 12 Progress to date: Effective management and conservation of Canada's living marine resources requires  

E-Print Network (OSTI)

Strategic Grant Proposal: Connectivity & Conservation in Marine Fishes Snelgrove et al., PIN 100213-explicit population models for fish populations have been difficult to generate, because the ocean is vast and most applications of metapopulation theory to marine fish species2 provide a framework for exploration

deYoung, Brad

448

DOE Office of Environmental Management Project and Contract Management Improvement Timeline  

Energy.gov (U.S. Department of Energy (DOE))

Improving DOE contract and project management is a top priority of the Department’s senior management and entire organization.  View some highlights of EM’s improvement actions here.

449

(DOE/EIS-0285/SA-12): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2) 2) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Olympia-Grand Coulee No.1 Transmission Line ROW. Location: The ROW is located in Pierce and King Counties, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the

450

(DOE/EIS-0285/SA-13): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) 3) James Jellison - TFO/Olympia Region - Natural Resource Specialist Bill Erickson - TFP/Walla Walla Region - Natural Resource Specialist Proposed Action: Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way (ROW). Location: The ROW is located in Pacific County, WA, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of

451

(DOE/EIS-0285/SA-02): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/9/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/09/01 3/09/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-02) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Danger tree clearing on nine ROWs. Locations are: the Franklin-Badger Canyon #2; Hedges Tap; White Bluffs-Richland; Grandview-Richland; Badger Canyon-Richland; Franklin- Riverview; Taylor Flats Tap; Walla Walla-Pendleton; and McNary-Slatt Transmission lines. Location: All ROWs are located in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in

452

(DOE/EIS-0285/SA-10): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) 0) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Duwamish No. 1 ROW from the Covington Substation to tower 10/4. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to

453

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test...

454

Waste Management Area (WMA) and supplemental well (SPW) guidance. Final report  

SciTech Connect

The purpose of the document is to provide guidance to RCRA Permit Writers and other interested parties regarding the implementation of WMA and SPW approaches according to the proposed amendments to the Subpart F Rule. The document will assist permit writers in defining single or multiple WMAs and includes a description of the proposed criteria to be considered when defining WMAs. The document also provides guidance for identifying the need for SPWs, describes the difference between SPWs and POC wells, and explains the use of SPWs for corrective action. Real and hypothetical cases are presented as examples throughout the document. Appendix I contains proposed modifications to the model permit language to be used in implementing the WMA and SPW approaches. Appendix II compares and contrasts the objectives and uses of WMAs and Corrective Action Management Units (CAMUs).

Not Available

1993-06-01T23:59:59.000Z

455

May 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2009 May 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

456

February 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 2009 February 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

457

Standards Actions - April 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-28-2002 3-28-2002 Activity Summary In Conversion - 4 In Preparation - 44 Out for Comment - 13 Published this Month - 2 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 2 Supersedure in Progress - 6 Cancellation Pending - 8 Cancellation in Progress - 2 No Current Action - 35 Inside this issue: DOE Technical Standards Project Canceled 1 DOE Technical Standard Recently Sent for Coordination 1 DOE Technical Standards Re- cently Published 2 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- April 2002 Standards Actions DOE Technical Standards Project Canceled

458

July 2009 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

459

Action-Oriented Benchmarking:  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb-2008 submitted to Energy Engineering Feb-2008 submitted to Energy Engineering Action-Oriented Benchmarking: Concepts and Tools Evan Mills, Paul Mathew & Mary Ann Piette, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT Most energy benchmarking tools provide static feedback on how one building compares to a larger set of loosely similar buildings, without providing information at the end-use level or on what can be done to reduce consumption, cost, or emissions. In this article-Part 1 of a two-part series-we describe an "action-oriented benchmarking" approach, which extends whole-building energy benchmarking to include analysis of system and component energy use metrics and features. Action-oriented benchmarking thereby allows users to generate more meaningful

460

May 2010 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) Standards Actions 1.0 DOE STANDARDS ACTIONS The Department of Energy (DOE) Technical Standards Program (TSP) publishes Standards Actions on a monthly basis to provide DOE headquarters and field elements with current information on DOE and select non-government standards activities. The complete list of all DOE Technical Standards projects and their status is available on the TSP web page at: http://www.hss.energy.gov/nuclearsafety/ns/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects, Approved Standards, Recently Approved Standards, or Drafts for Review, as

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production DOE/EA-1532 June 2005 National Nuclear Security Administration Sandia Site Office P.O. Box 5400 Albuquerque, New Mexico 87185-5400 Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production i Final EA DOE/EA-1532 June 2005 TABLE OF CONTENTS 1.0 PURPOSE AND NEED FOR AGENCY ACTION ........................................................................ 1 2.0 NO ACTION AND PROPOSED ACTION ALTERNATIVES...................................................... 2 2.1 No Action Alternative....................................................................................... 5

462

U.S. DEP."-RTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DETFRJ.IINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RTMENT OF ENERGY RTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DETFRJ.IINATION RECIPIENT:Protec Fuel Management PROJECT TITLE : Flash Foods Job Creation and Petroleum Independence with E85 Page I of2 STATE: GA Funding Opportunity Announcement Number DE-FOA-OOOOO125 Procurement Instrument Number DE-EEOOO3053 NEPA Control Number em Number GFO-OOO3053-003 0 Based on my review o(the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EI S APPENDIX AND NUMBER : Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

463

Managing a manufacturing company in a wired world  

Science Journals Connector (OSTI)

Under new conditions of unlimited access to information technology, the management of a manufacturing company will be changed to take advantage of new capabilities based on internet, intranet and computing and simulation technologies. A conceptual model of management system, applicable in small and medium size manufacturing companies (SMEs), has been developed. It integrates physical, information and knowledge value chains. Based on this concept, a managerial ''dashboard'' is proposed as a tool allowing a manager to access information from sources inside and outside the company, to check financial/economic conditions and to simulate alternative courses of actions. The tool operates as a hypertext system and includes modules representing the internal operations of company and its interfaces with suppliers and knowledge providers. It also includes a microworlds simulation module and a module of return-on-investment analysis.

A.B. Jambekar; K.I. Pelc

2002-01-01T23:59:59.000Z

464

Locations Everyone: Lights, Camera, Action!  

Science Journals Connector (OSTI)

Locations Everyone: Lights, Camera, Action! ... Harvard Institute of Proteomics Harvard Medical School ...

Robert F. Murphy; Joshua LaBaer

2008-12-05T23:59:59.000Z

465

EIS-0472: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

466

June 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 June 2006 Page 1 June 2006 Technical Standards Program Manager's Note 1 Safety for Electrical Workers 2 Significant Federal Laws and Policies 3 Clearance of Solid Materials from Nuclear Facilities 5 Technical Standards Manager Spotlight 6 Topical Committee Developments 7 From the ANSI Web site 8 Don't Get "Board" With

467

Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84 84 Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia June 2002 U. S. Department of Energy Oak Ridge Operations Oak Ridge, Tennessee DOE/EA-1384 i TABLE OF CONTENTS Executive Summary.....................................................................................................................1 1. INTRODUCTION..................................................................................................................... 6 1.1 PREVIOUS ACTIONS ............................................................................................................................................. 6 1.2 SCOPE OF THIS PROPOSED ACTION..............................................................................................................

468

(DOE/EIS-0285/SA-99): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Olympia-Grand Coulee No.1 8/29/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-99-Olympia-Grand Coulee No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Olympia-Grand Coulee No. 1, 287 kV transmission line from structure 53/4 through structure 64/1. Corridor width is 125 feet. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 163 acres will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded

469

(DOE/EIS-0285/SA 84): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Monroe-Custer No.1 7/1/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July July 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 84 Monroe-Custer No.l Don Atkinson -- - TFN/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the