National Library of Energy BETA

Sample records for manager proposed action

  1. Environmental Assessment - Proposed Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for

  2. Description of Proposed Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical

  3. Categorical Exclusion Determination Form Proposed Action Title...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects ...

  4. Implementation Proposal for the National Action Plan on Demand...

    Energy Savers [EERE]

    Implementation Proposal for the National Action Plan on DemandResponse - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to ...

  5. N Springs expedited response action proposal

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

  6. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... for addressing Office of Environmental Management (EM) Headquarters (HQ) issues ...

  7. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I Environmental Management Headquarters Corrective Action Plan - Radiological Release ... for addressing Office of Environmental Management (EM) Headquarters (HQ) issues ...

  8. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The ... for addressing Office of Environmental Management (EM) Headquarters (HQ) issues ...

  9. SEE Action Series: Strategic Energy Management

    Broader source: Energy.gov [DOE]

    A presentation on Strategic Energy Management from a webinar hosted by the Existing Commercial Buildings Working Group at SEE Action.

  10. ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE

    Office of Legacy Management (LM)

    ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . .

  11. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Release Phase I | Department of Energy I Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase I The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified 31

  12. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Release Phase II | Department of Energy II Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase II The purpose ofthis Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified

  13. Corrective Action Plan for Environmenta' Management Headquarters

    Energy Savers [EERE]

    Corrective Action Plan for Environmenta' Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14~ 2014 Washington, DC 20585 August 2015 Corrective Action Plan for Environmental Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Deputy Assistant Secretary for Safety, Security, and Quality Programs Environmental Management Approved by: Monica Regalbuto Assistant Secretary for

  14. The NEPA threshold question revisited: Proposed'' actions and continuing'' activities

    SciTech Connect (OSTI)

    Wolff, T.A. ); Hansen, R.P. )

    1993-01-01

    The National Environmental Policy Act (NEPA) requires Federal agencies to include a detailed statement'' in every recommendation or report on proposals'' for major Federal actions significantly affecting the quality of the human environment.'' Unless the three elements of a proposal are present (major, federal, and action), preparation of a detailed statement is not required. This paper addresses the practical decision-making dilemma that attends determinations of what types of Federal activities meet the NEPA threshold test under what kinds of varying circumstances. The authors' experience with the US Dept. of Energy (DOE) NEPA documentation is used to discuss how decisions may be made to determine whether a proposed action qualifies for a categorical exclusion'' or whether it requires preparation of an environmental assessment (EA) or an environmental impact statement (EIS). The concept of new'' actions versus continuing'' actions which may be bounded'' by previous NEPA documentation is also discussed. A dichotomous key for separating or combining Federal action'' candidates for different levels of NEPA documentation is provided. Leading court opinions on the threshold question and related issues are discussed in lay terms.

  15. EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

  16. Earned Value Management System (EVMS) Corrective Action Standard...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EVMS) Corrective Action Standard Operating Procedure Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure This EVMS Corrective Action Standard ...

  17. Transition of Long-Term Response Action Management Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transition of Long-Term Response Action Management Requirements Transition of Long-Term Response Action Management Requirements The purpose of this memorandum is to provide you ...

  18. Environmental Management Los Alamos Field Corrective Action Plan...

    Energy Savers [EERE]

    Los Alamos Field Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Corrective Action Plan - Radiological Release Phase II On March...

  19. Managing Legacy Records for Formerly Utilized Sites Remedial Action Program

    Energy Savers [EERE]

    Sites | Department of Energy Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008) PDF icon Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites More Documents & Publications FUSRAP Overview Recent Developments in DOE FUSRAP Process for

  20. NNSA Contract Reform in Action: Supply Chain Management Center...

    National Nuclear Security Administration (NNSA)

    Contract Reform in Action: Supply Chain Management Center | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

  1. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  2. Earned Value Management System (EVMS) Corrective Action Standard Operating

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedure | Department of Energy (EVMS) Corrective Action Standard Operating Procedure Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as PM's primary reference for development of Corrective Action Requests (CARs) and Continuous Improvement Opportunities (CIOs), as well as the assessment of contractors procedures and implementation associated with Variance Analysis Reports (VARs) and

  3. Internal Audit Management of Corrective Action Plans | The Ames...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internal Audit Management of Corrective Action Plans Version Number: 1.0 Document Number: Procedure 10300.001 Effective Date: 01...

  4. Internal Audit Management of Corrective Action Plans | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internal Audit Management of Corrective Action Plans Version Number: 1.0 Document Number: Procedure 10300.001 Effective Date: 01

  5. DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EA for Conveyance of Land at the Hanford Site, Richland, WA Page 1 of 6 September 2015 DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE, RICHLAND, WASHINGTON AGENCY: U.S. Department of Energy Richland Operations Office ACTION: Mitigation Action Plan SUMMARY: This Mitigation Action Plan (MAP) is an integral part of the Finding of No Significant Impact (FONSI) for the United States Department of Energy's (DOE) Environmental Assessment for Proposed Conveyance of

  6. EA-2005: Notice of Proposed Floodplain Action | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chromium Plume Control Interim Measure and Plume-Center Characterization, Los Alamos National Laboratory, Los Alamos, NM The Department of Energy Environmental Management Los ...

  7. Proposed Action Title: U.S. Department of Energy Southwestern...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner...

  8. Environmental Management Los Alamos Field Office Corrective Action Plan -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Release Phase II | Department of Energy Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II On March 22, 2015, the Department of Energy established an Environmental Management Los Alamos Field Office (EM-LA) responsible for management of the environmental restoration and the legacy waste management programs at Los Alamos National Laboratory (LANL).

  9. CEQ Guidance on the Application of NEPA to Proposed Federal Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    States with Transboundary Effects CEQ Guidance on the Application of NEPA to Proposed Federal Actions in the United States with Transboundary Effects CEQ Guidance on the ...

  10. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect (OSTI)

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  11. Environmental Management Headquarters Corrective Action Plan - Truck Fire |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant (WIPP) February 5, 2014. The report identified 22 Conclusions and 35 Judgments of

  12. DOE Issues Draft Request for Proposals Seeking Contractor to Manage,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operate Waste Isolation Pilot Plant | Department of Energy Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant April 1, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP)seeking a management and operations contractor to

  13. Bureau of Land Management - Techniques for Documenting a No Action...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Techniques for Documenting a No Action Alternative in an EA Abstract This page...

  14. Title 40 CFR 1502.14 Alternatives Including the Proposed Action...

    Open Energy Info (EERE)

    .14 Alternatives Including the Proposed Action Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR...

  15. Proposed Action Title: U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Line Segment Modification, Line 3004, Structures 39, 39A, and 40 Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Springfield, Christian County, Missouri SWPA F450.4 (Rev. 2/16) Proposed Action Description: Southwestern Power Administration proposes to modify and relocate a small seqment of transmission line to accommodate and provide safety clearance for a retail development project in an urbanized section of Springfield, Missouri.

  16. Action

    National Nuclear Security Administration (NNSA)

    Register / Vol. 72, No. 39 1 Wednesday, February 28, 2007 /Notices 9037 - has requested this exemption in order to revise the October 1988 exemption to include additional combustibles such as the 480V Reactor Building Vent Boards lB, 2B, and 3B; small panels in Units 1, 2 and 3; and the one hour fire rated fire wrap (Thermo-lag) material for the 20- foot separation zones identified. Environmental Impacts of the Proposed Action The proposed action will not significantly increase the probability

  17. Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 2 Proposed Action and Alternatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES Some types of experiments are best (or only) performed deep underground. For this reason, scientists have considered WIPP as a potential site for these types of experiments and have sought permission from DOE to conduct several types of experiments there. As an example, astrophysicists are searching for very small particles with no charge called neutrinos. These particles are so small that they typically pass through the Earth. The only way to

  18. Office of Personnel Management The Guide to Processing Personnel Actions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STANDARD FORM 144 (Rev. 10/95) Page 2 Office of Personnel Management The Guide to Processing Personnel Actions 1. Name (Last, First, Middle Initial) STATEMENT OF.PRIOR FEDERAL SERVICE To be Completed by Employee 2. Social Security Number 3. Date of Birth (Month, Day, Year) 4. Does the application or resume that you submitted, for the position to which you are being appointed, list all of your Federal government civilian and uniformed service, including beginning and ending dates, as well as the

  19. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect (OSTI)

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  20. Corporate planning for compliance with EPA`s proposed risk management program rule

    SciTech Connect (OSTI)

    Mannan, M.; Keeney, R.C.

    1995-12-31

    On October 20, 1993, the US Environmental Protection Agency (EPA) published in the Federal Register the proposed rule entitled Risk Management Programs for Chemical Accidental Release Prevention (40 CFR 68). Subsequently, on January 31, 1994, EPA published in the Federal Register the finalized list of 77 regulated toxic substances and 63 regulated flammable substances that are to be covered under the rule along with the associated threshold quantities for each substance. This list of substances will dictate which stationary sources will have to comply with the requirements of the proposed risk management program rule. The risk management program rule will most likely be finalized sometime after mid-1995. Covered facilities will then have a total of three years to achieve complete compliance with the requirements of the rule. This paper presents an approach for corporations with multiple sites to develop action plans for implementation of the risk management program rule. The process starts with a determination of which facilities are potentially covered, development of a matrix of requirements that each facility must comply with, and finally, common strategies that may be used in achieving compliance. Thus, a multi-facility corporation can develop a baseline compliance guideline document that individual plants can use in developing and implementing their risk management programs.

  1. DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

  2. Process safety management and interim or remedial action plans

    SciTech Connect (OSTI)

    Boss, M.J.; Henney, D.A.; Heitzman, V.K. [HWS Consulting Group, Inc., Omaha, NE (United States); Day, D.W. [Army Corps of Engineers, Omaha, NE (United States)

    1996-12-31

    Remedial Actions, including Interim Remedial Activities, often require the use of treatment facilities or stabilization techniques using on-site chemical processes. As such, the 29 CFR 1910.119 Process Safety Management (PSM) of Highly Hazardous Chemicals (PSM Standard) and the USEPA regulations for Risk Management Planning require that these chemicals and their attendant potential hazards be identified. A Hazard and Operation (HAZOP) study, Failure Mode and Effect Analysis (FMEA), Fault Tree Analysis, or equivalent graphic presentation of processes must be completed. These studies form a segment of the Process Hazard Analysis (PHA). HAZOP addresses each system and each element of a system that could deviate from normal operations and thus cause a hazard. A full assessment of each process is produced by looking at the hazards, consequences, causes and personnel protection needed. Many variables must be considered when choosing the appropriate PHA technique including the size of the plant, the number of processes, the types of processes, and the types of chemicals used. A mixture of these techniques may be required to adequately transmit information about the process being evaluated.

  3. BPA's proposed oversupply management protocol, Attachment P Narrative...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal agencies that operate the dams take reasonable actions to protect endangered fish and other aquatic species by maintaining Total Dissolved Gas ("TDG") levels at or below...

  4. Notice of Office of Management and Budget Action to Approve with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial ...

  5. Notice of Office of Management and Budget Action to Approve with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) ...

  6. EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    NOTE: This EA has been cancelled. This EA will evaluate the environmental impacts of DOE’s proposed modifications to the allowable land uses, utility infrastructure, and Natural Area management responsibility for Parcel ED-1. The purpose of the modifications is to enhance the development potential of the Horizon Center business/industrial park, while ensuring protection of the adjacent Natural Area. The area addressed by the proposed action was evaluated for various industrial/business uses in the Environmental Assessment Addendum for the Proposed Title Transfer of Parcel ED-1, DOE/EA-1113-A.

  7. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EA that assesses potential environmental impacts of the proposed continuation of operation and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System in Arizona, California, and Nevada. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  8. Notice of Office of Management and Budget Action to Approve with Change the

    Energy Savers [EERE]

    Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants | Department of Energy a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change as an emergency action for six months the

  9. NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION

    Broader source: Energy.gov (indexed) [DOE]

    10132011 ACTION REQUESTED: Revision of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201110-1910-001 AGENCY ICR TRACKING NUMBER:...

  10. Proposed Resource Management Plan/Final Environmental Impact...

    National Nuclear Security Administration (NNSA)

    ... owl (BLM sensitive species) * Sunnyside green gentian (BLM sensitive species) To manage ... Monitoring wind energy development projects; and * Rehabilitating areas damaged by fires. ...

  11. Request for Personnel Actions (For Managers and Adminstrative Officers)

    Broader source: Energy.gov [DOE]

    Headqaurters uses the CHRIS Workflow Tool to submit and process Personnel Actions. There is no longer a need for a hard copy Standard Form-52 (SF-52).  Each personnel action is approved via CHRIS...

  12. BPA's proposed oversupply management protocol for comment, Feb...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    charge. BPA is seeking comments on the proposal, which is described in two documents: a) new tariff language for addressing oversupply (Attachment P); and b) a more detailed...

  13. Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer Involvement Reports & Tools...

  14. Finding of no significant impact proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida

    SciTech Connect (OSTI)

    1995-06-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-0976) of the proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida. The Northeast Site contains contaminated groundwater that would be removed, treated, and discharged to the Pinellas County Sewer System. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C.4321 et.seq. Therefore, the preparation of an environmental impact statement is not required and the DOE is issuing this Finding of No Significant Impact (FONSI).

  15. BPA, press release, proposal for oversupply management protocol...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2012 CONTACT: Doug Johnson, 503-230-5840 or Mike Hansen, 503-230-4328 or 503-230-5131 BPA proposes resolution to electricity oversupply The Bonneville Power Administration today...

  16. PRESENTATION: OVERVIEW OF PROPOSED "DARPA-INSPIRED" APPROACH TO ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT

    Broader source: Energy.gov [DOE]

    A briefing to the SEAB Task Force on Technology Development for Environmental Management (EM) on a proposed "DARPA-Inspired" approach to technology development for EM.

  17. Tracking federal land management: Report No. 3 on federal land management actions impacting geothermal commecialization at selected target prospects in the five Pacific Rim states

    SciTech Connect (OSTI)

    Not Available

    1980-05-20

    Generic land management actions affecting geothermal commerializtion in Pacific River states are reviewed. Specific federal land management actions affecting geothermal prospects in California and the Pacific Northwest are described. (MHR)

  18. Energy management study: A proposed case of government building

    SciTech Connect (OSTI)

    Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd; Baharum, Mohd Faizal

    2015-05-15

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.

  19. CEQ Guidance on the Application of NEPA to Proposed Federal Actions in the United States with Transboundary Effects

    Broader source: Energy.gov [DOE]

    The purpose of this guidance is to clarify the applicability of the National Environmental Policy Act (NEPA) to proposed federal actions in the United States, including its territories and possessions, that may have transboundary effects extending across the border and affecting another country's environment. While the guidance arises in the context of negotiations undertaken with the governments of Mexico and Canada to develop an agreement on transboundary environmental impact assessment in North America, the guidance pertains to all federal agency actions that are normally subject to NEPA, whether covered by an international agreement or not.

  20. Transcript of See Action and Technical Assistance Program Webinar: Strategic Energy Management

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) See Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

  1. I U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters

    Energy Savers [EERE]

    ' I U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters Accident Investigation Report Underground Salt Haul Truck Fire at the Waste Isolation ' Pilot Plant February SJ 2014 Washington, DC 20585 August 2014 Corrective Action Plan for Environmental Management Headquarters Accident Investigation Report Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant February 5, 2014 Prepared : James Hutton Acting Deputy Assistant Secretary for Safety,

  2. Notice of Office of Management and Budget Action to Approve with Change the

    Energy Savers [EERE]

    Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants | Department of Energy an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection

  3. Environmental Management Los Alamos Field Office Corrective Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office (NA-LA) continues with the responsibility for the management of LANL's national ... and EM-LA Field Offices, with joint responsibility for addressing the Judgements of Need ...

  4. Review and analysis of proposed EPA groundwater standards for the UMTRA Project. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all sites. On September 24, 1987, the EPA published proposed standards in response to the remand. This Summary Report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project as well as a discussion of the DOE's position on the proposed standards. This report is accompanied by a detailed Technical Report and Appendices which provide supporting information and analyses. This Summary Report results from a study undertaken to: determine the impact of the proposed standards on the UMTRA Project; and recommend provisions for the implementation of the final standards that will minimize adverse impact to the conduct of the UMTRA Project while ensuring protection of human health and the environment. Specifically, the following were considered: the flexibility of the proposed standards; interpretations of the proposed standards; the extent of aquifer restoration that may be required to implement the proposed standards at each site; the costs of aquifer restoration; and design changes necessary to meet the standards.

  5. Engineering evaluation/cost analysis for the proposed management of 15 nonprocess buildings (15 series) at the Weldon Spring Site Chemical Plant, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    MacDonell, M M; Peterson, J M

    1989-05-01

    The US Department of Energy, under its Surplus Facilities Management Program (SFMP), is responsible for cleanup activities at the Weldon-Spring site, located near Weldon Spring, Missouri. The site consists of two noncontiguous areas: (1) a raffinate pits and chemical plant area and (2) a quarry. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support a proposed removal action to manage 15 nonprocess buildings, identified as the 15 Series buildings, at the chemical plant on the Weldon Spring site. These buildings have been nonoperational for more than 20 years, and the deterioration that has occurred during this time has resulted in a potential threat to site workers, the general public, and the environment. The EE/CA documentation of this proposed action is consistent with guidance from the US Environmental Protection Agency (EPA) that addresses removal actions at sites subject to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986. Actions at the Weldon Spring site are subject to CERCLA requirements because the site is on the EPA`s National Priorities List. The objectives of this report are to (1) identify alternatives for management of the nonprocess buildings; (2) document the selection of response activities that will mitigate the potential threat to workers, the public, and the environment associated with these buildings; and (3) address environmental impacts associated with the proposed action.

  6. Transition of Long-Term Response Action Management Requirements

    Office of Environmental Management (EM)

    Facility | Department of Energy Transfer Lines to Connect Liquid Waste Facilities and Salt Waste Processing Facility Transfer Lines to Connect Liquid Waste Facilities and Salt Waste Processing Facility October 30, 2014 - 12:00pm Addthis Savannah River Remediation (SRR) Salt Waste Processing Facility (SWPF) Integration Manager Keith Harp (front right) points to the spot where the Savannah River Site’s liquid waste facilities transfer lines will connect to lines from the SWPF, which

  7. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    SciTech Connect (OSTI)

    Not Available

    1988-01-29

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project, as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.

  8. DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot Plant

    Broader source: Energy.gov [DOE]

    Cincinnati --The U.S. Department of Energy (DOE) today issued a Final Request for Proposal for management and operations of the Waste Isolation Pilot Plan (WIPP) located in Carlsbad, New Mexico.

  9. Energy Department Issues Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Request for Proposal (RFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement

  10. Energy Department Issues Draft Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement.

  11. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Argonne National Laboratory | Department of Energy Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office

  12. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fermi National Accelerator Laboratory | Department of Energy Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National

  13. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its Princeton Plasma Physics Laboratory | Department of Energy Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility

  14. Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012)

    Broader source: Energy.gov [DOE]

    U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.).

  15. U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Corrective Action Plan for Environmental Management Headquarters Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Washington, DC 20585 March 2015 Page 3 of 32 TABLE OF CONTENTS 1.0 PURPOSE ..................................................................................................................................................5 2.0 BACKGROUND

  16. U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters

    Energy Savers [EERE]

    Corrective Action Plan for Environmental Management Headquarters Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Washington, DC 20585 March 2015 Page 3 of 32 TABLE OF CONTENTS 1.0 PURPOSE ..................................................................................................................................................5 2.0 BACKGROUND

  17. Environmental Management Los Alamos Field Corrective Action Plan- Radiological Release Phase II

    Broader source: Energy.gov [DOE]

    On March 22, 2015, the Department of Energy established an Environmental Management Los Alamos Field Office (EM-LA) responsible for management of the environmental restoration and the legacy waste management programs at LANL. The NA-LA continues with the responsibility for the management of LANL's national security mission and the enduring waste management program (newly generated waste). As a result of this delineation in responsibilities, this corrective action plan was prepared collaboratively between NA-LA and EM-LA Field Offices, with joint responsibility for addressing the Judgement of Needs (JONs) identified in the Accident Investigation Board Accident Investigation Report, Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant, February 14, 2014, dated April 2015.

  18. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its Ames Laboratory | Department of Energy Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory June 29, 2006 - 2:48pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames Laboratory, a DOE Office of Science (SC) research facility in Ames, Iowa. This competition for a contractor is the

  19. Finding of no significant impact for the interim action for cleanup of Pit 9 at the Radioactive Waste Management Complex, Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0854, for an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The proposed action would be conducted at Pit 9, Operable Unit 7--10, located at the Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) at the Idaho National Engineering Laboratory (INEL). The proposed action consists of construction of retrieval and processing buildings, excavation and retrieval of wastes from Pit 9, selective physical separation and chemical extraction, and stabilization of wastes either through thermal processing or by forming a stabilized concentrate. The proposed action would involve limited waste treatment process testing and full-scale waste treatment processing for cleaning up pre-1970 Transuranic (TRU) wastes in Pit 9. The purpose of this interim action is to expedite the overall cleanup at the RWMC and to reduce the risks associated with potential migration of Pit 9 wastes to the Snake River Plain Aquifer.

  20. Environmental data and analyses for the proposed management of spent nuclear fuel on the DOE Oak Ridge Reservation

    SciTech Connect (OSTI)

    Socolof, M.L.; Curtis, A.H.; Blasing, T.J.

    1995-08-01

    DOE needs to continue the safe and efficient management of SNF on ORR, based on the requirement for future SNF storage capacity and implementation of the ROD for the PEIS. DOE is proposing to implement the ROD through proper management of SNF on ORR, including the possible construction and operation of a dry cask storage facility. This report describes the potentially affected environment and analyzes impacts on various resources due to the proposed action. The information provided in this report is intended to support the Environmental Assessment being prepared for the proposed activities. Construction of the dry cask storage facility would result in minimal or no impacts on groundwater, surface water, and ecological resources. Contaminated soils excavated during construction would result in negligible risk to human health and to biota. Except for noise from trucks and equipment, operation of the dry cask storage facility would not be expected to have any impact on vegetation, wildlife, or rare plants or animals. Noise impacts would be minimal. Operation exposures to the average SNF storage facility worker would not exceed approximately 0.40 mSv/year (40 mrem/year). The off-site population dose within an 80-km (50-mile) radius of ORR from SNF operations would be less than 0.052 person-Sv/year (5.2 person-rem/year). Impacts from incident-free transportation on ORR would be less than 1.36 X 10{sup -4} occupational fatal cancers and 4.28 X 10{sup -6} public fatal cancers. Credible accident scenarios that would result in the greatest probable risks would cause less than one in a million cancer fatalities to workers and the public.

  1. Vehicle Technologies Office Battery Research Partner Requests Proposals for Thermal Management Systems

    Broader source: Energy.gov [DOE]

    The U.S. Advanced Battery Consortium (USABC) (www.uscar.org/usabc), which partners with the Vehicle Technologies Office to support battery research and development projects, recently issued a request for proposal information. The request focuses on projects that would provide a significant improvement over current thermal management systems for lithium-ion (Li-ion) batteries used in vehicle applications while still meeting the USABC goals. The deadline for submission is Monday, February 22, 2016.

  2. Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011)

    Broader source: Energy.gov [DOE]

    U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.).The Court has issued the injunctive...

  3. UMTRA Surface Project management action process document. Final report: Revision 1

    SciTech Connect (OSTI)

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

  4. Financial and economic determinants of collective action: The case of wastewater management

    SciTech Connect (OSTI)

    Brunner, Norbert; Starkl, Markus

    2012-01-15

    Where public environmental funds support development of wastewater infrastructure, funding institutions ensure the economic use of funds, while the beneficiaries minimize their own costs. In rural areas, there is often a choice between decentralized or centralized (multi-village) systems: if the centralized system is most economic, then only this system is eligible for public funding. However, its implementation requires a voluntary cooperation of the concerned communities, who need to organize themselves to develop and run the infrastructure. The paper analyzes the social determinants of collaboration in a generic case study, using the following variables: method of (economic) assessment, modeled by the social discount rate, funding policy, modeled by the funding rate, and users' self-organization, modeled by cost sharing. In a borderline situation, where the centralized system turns out to be most economic, but this assessment is contingent on the assessment method, collective action may fail: the advantages of collective action from funding are too small to outweigh organizational deficiencies. Considering in this situation sanitation as a human right, authors recommend using innovative forms of organization and, if these fail, reassessing either the amount of funding or the eligibility for funding of more acceptable alternatives. - Highlights: Black-Right-Pointing-Pointer A generic case study models collective action and funding in wastewater management. Black-Right-Pointing-Pointer Determinants of success: economic assessment, funding policy and self-organization. Black-Right-Pointing-Pointer Success indicators: conflict rate, funds needed to make cost shares fair. Black-Right-Pointing-Pointer Method for analyzing centralized vs. decentralized disputes. Black-Right-Pointing-Pointer If collective action has less benefits, innovative cost sharing may ensure success.

  5. RAPIDD Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by ALS management, appropriate to the proposal. Rapid Access Proposals (RA) A proportion of beam time on some beamlines is reserved to provide rapid access for simple,...

  6. Alternatives for management of wastes generated by the formerly utilized sites remedial action program and supplement

    SciTech Connect (OSTI)

    Gilbert, T.L.; Peterson, J.M.; Vocke, R.W.; Alexander, J.K.

    1983-03-01

    Alternatives for disposal or stabilization of the wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP) are identified and compared, with emphasis on the long-term aspects. These wastes consist of soil material and rubble containing trace amounts of radionuclides. A detailed pathway analysis for the dose to the maximally exposed individual is carried out using an adaptation of the natural analogue method. Comparisons of the different alternatives, based on the results of the pathway analysis and qualitative cost considerations, indicate that, if the hazard is such that the wastes must be removed and disposed of rather than stabilized in place, disposal by immediate dispersal is preferable to containment, and containment followed by slow planned dispersal is preferable to containment without dispersal. The Supplement presents refinements of work that was reported at the 1982 International Decommissioning Symposium. The new material consists of revisions of the estimates of the predicted potential dose to the maximally exposed individual and a more detailed comparative assessment of the radiological impacts of alternatives for management of wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP).

  7. DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued)

    Broader source: Energy.gov [DOE]

    The Office of General Counsel has issued a Notice of Proposed Civil Penalty to Hudson-Reed Limited for failing to certify to DOE that showerheads manufactured or distributed within the United...

  8. U.S. Department of Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012 This report serves as an official record of the annual cost, personnel, and performance information for the Office of Legacy Management to satisfy the post competition accountability requirements. Reporting Period: Fiscal Years (FY) 2012 - 2016 FY2014 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016

  9. Corrective action management unit application for the Environmental Restoration Disposal Facility

    SciTech Connect (OSTI)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

  10. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    SciTech Connect (OSTI)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J.; Roybal, A.L.

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  11. Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

  12. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that

  13. 60-DAY Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper

  14. MSS 1.1 Corrective Action/Issue Management 4/13/2000

    Broader source: Energy.gov [DOE]

    The objective of this surveillance is to verify that contractor personnel are effectively managing environment, safety, and health issues.  The activities included in this surveillance help the...

  15. F-Area Hazardous Waste Management Facility Semiannual Correction Action Report, Vol. I and II

    SciTech Connect (OSTI)

    Chase, J.

    1999-11-18

    The groundwater in the uppermost aquifer beneath the F-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site is routinely monitored for selected hazardous and radioactive constituents. This report presents the results of the required groundwater monitoring program.

  16. RCRA corrective action determination of no further action

    SciTech Connect (OSTI)

    1996-06-01

    On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.

  17. MO-E-9A-01: Risk Based Quality Management: TG100 In Action

    SciTech Connect (OSTI)

    Huq, M; Palta, J; Dunscombe, P; Thomadsen, B

    2014-06-15

    One of the goals of quality management in radiation therapy is to gain high confidence that patients will receive the prescribed treatment correctly. To accomplish these goals professional societies such as the American Association of Physicists in Medicine (AAPM) has published many quality assurance (QA), quality control (QC), and quality management (QM) guidance documents. In general, the recommendations provided in these documents have emphasized on performing device-specific QA at the expense of process flow and protection of the patient against catastrophic errors. Analyses of radiation therapy incidents find that they are most often caused by flaws in the overall therapy process, from initial consult through final treatment, than by isolated hardware or computer failures detectable by traditional physics QA. This challenge is shared by many intrinsically hazardous industries. Risk assessment tools and analysis techniques have been developed to define, identify, and eliminate known and/or potential failures, problems, or errors, from a system, process and/or service before they reach the customer. These include, but are not limited to, process mapping, failure modes and effects analysis (FMEA), fault tree analysis (FTA), and establishment of a quality management program that best avoids the faults and risks that have been identified in the overall process. These tools can be easily adapted to radiation therapy practices because of their simplicity and effectiveness to provide efficient ways to enhance the safety and quality of treatment processes. Task group 100 (TG100) of AAPM has developed a risk-based quality management program that uses these tools. This session will be devoted to a discussion of these tools and how these tools can be used in a given radiotherapy clinic to develop a risk based QM program. Learning Objectives: Learn how to design a process map for a radiotherapy process. Learn how to perform a FMEA analysis for a given process. Learn what Fault tree analysis is all about. Learn how to design a quality management program based upon the information obtained from process mapping, FMEA and FTA.

  18. Using social media for actionable disease surveillance and outbreak management. A systematic literature review

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Charles-Smith, Lauren E.; Reynolds, Tera L.; Cameron, Mark A.; Conway, Mike; Lau, Eric H. Y.; Olsen, Jennifer M.; Pavlin, Julie A.; Shigematsu, Mika; Streichert, Laura C.; Suda, Katie J.; et al

    2015-10-05

    Here, research studies show that social media may be valuable tools in the disease surveillance toolkit used for improving public health professionals’ ability to detect disease outbreaks faster than traditional methods and to enhance outbreak response. A social media work group, consisting of surveillance practitioners, academic researchers, and other subject matter experts convened by the International Society for Disease Surveillance, conducted a systematic primary literature review using the PRISMA framework to identify research, published through February 2013, answering either of the following questions: 1) Can social media be integrated into disease surveillance practice and outbreak management to support and improvemore » public health? 2) Can social media be used to effectively target populations, specifically vulnerable populations, to test an intervention and interact with a community to improve health outcomes? Examples of social media included are Facebook, MySpace, microblogs (e.g., Twitter), blogs, and discussion forums. For Question 1, 33 manuscripts were identified, starting in 2009 with topics on Influenza-like Illnesses (n=15), Infectious Diseases (n = 6), Non-infectious Diseases (n=4), Medication and Vaccines (n=3), and Other (n=5). For Question 2, 32 manuscripts were identified, the first in 2000 with topics on Health Risk Behaviors (n=10), Infectious Diseases (n = 3), Non-infectious Diseases (n=9), and Other (n=10). The literature on the use of social media to support public health practice has identified many gaps and biases in current knowledge. Despite the potential for success identified in exploratory studies, there are limited studies on interventions and little use of social media in practice. However, information gleaned from the articles demonstrates the effectiveness of social media in supporting and improving public health and in identifying target populations for intervention. A primary recommendation resulting from the review is to identify opportunities that enable public health professionals to integrate social media analytics into disease surveillance and outbreak management practice.« less

  19. Using social media for actionable disease surveillance and outbreak management. A systematic literature review

    SciTech Connect (OSTI)

    Charles-Smith, Lauren E.; Reynolds, Tera L.; Cameron, Mark A.; Conway, Mike; Lau, Eric H. Y.; Olsen, Jennifer M.; Pavlin, Julie A.; Shigematsu, Mika; Streichert, Laura C.; Suda, Katie J.; Corley, Courtney D.; Braunstein, Lidia Adriana

    2015-10-05

    Here, research studies show that social media may be valuable tools in the disease surveillance toolkit used for improving public health professionals’ ability to detect disease outbreaks faster than traditional methods and to enhance outbreak response. A social media work group, consisting of surveillance practitioners, academic researchers, and other subject matter experts convened by the International Society for Disease Surveillance, conducted a systematic primary literature review using the PRISMA framework to identify research, published through February 2013, answering either of the following questions: 1) Can social media be integrated into disease surveillance practice and outbreak management to support and improve public health? 2) Can social media be used to effectively target populations, specifically vulnerable populations, to test an intervention and interact with a community to improve health outcomes? Examples of social media included are Facebook, MySpace, microblogs (e.g., Twitter), blogs, and discussion forums. For Question 1, 33 manuscripts were identified, starting in 2009 with topics on Influenza-like Illnesses (n=15), Infectious Diseases (n = 6), Non-infectious Diseases (n=4), Medication and Vaccines (n=3), and Other (n=5). For Question 2, 32 manuscripts were identified, the first in 2000 with topics on Health Risk Behaviors (n=10), Infectious Diseases (n = 3), Non-infectious Diseases (n=9), and Other (n=10). The literature on the use of social media to support public health practice has identified many gaps and biases in current knowledge. Despite the potential for success identified in exploratory studies, there are limited studies on interventions and little use of social media in practice. However, information gleaned from the articles demonstrates the effectiveness of social media in supporting and improving public health and in identifying target populations for intervention. A primary recommendation resulting from the review is to identify opportunities that enable public health professionals to integrate social media analytics into disease surveillance and outbreak management practice.

  20. Using Social Media for Actionable Disease Surveillance and Outbreak Management: A Systematic Literature Review

    SciTech Connect (OSTI)

    Charles-Smith, Lauren E.; Reynolds, Tera; Cameron, Mark; Conway, Mike; Lau, Eric H.; Olsen, Jennifer; Pavlin, Julie A.; Shigematsu, Mika; Streichert, Laura; Suda, Katie; Corley, Courtney D.

    2015-10-05

    Research studies show that social media may be valuable tools in the disease surveillance toolkit used for improving public health professionals ability to detect disease outbreaks faster than traditional methods and to enhance outbreak response. A social media work group, consisting of surveillance practitioners, academic researchers, and other subject matter experts convened by the International Society for Disease Surveillance, conducted a systematic primary literature review using the PRISMA framework to identify research, published through February 2013, answering either of the following questions: 1) Can social media be integrated into disease surveillance practice and outbreak management to support and improve public health? 2) Can social media be used to effectively target populations, specifically vulnerable populations, to test an intervention and interact with a community to improve health outcomes? Examples of social media included are Facebook, MySpace, microblogs (e.g., Twitter), blogs, and discussion forums. For Question 1, 33 manuscripts were identified, starting in 2009 with topics on Influenza-like Illnesses (n=15), Infectious Diseases (n = 6), Non-infectious Diseases (n=4), Medication and Vaccines (n=3), and Other (n=5). For Question 2, 32 manuscripts were identified, the first in 2000 with topics on Health Risk Behaviors (n=10), Infectious Diseases (n = 3), Non-infectious Diseases (n=9), and Other (n=10). The literature on the use of social media to support public health practice has identified many gaps and biases in current knowledge. Despite the potential for success identified in exploratory studies, there are limited studies on interventions and little use of social media in practice. However, information gleaned from the articles demonstrates the effectiveness of social media in supporting and improving public health and in identifying target populations for intervention. A primary recommendation resulting from the review is to identify opportunities that enable public health professionals to integrate social media analytics into disease surveillance and outbreak management practice.

  1. RCRA corrective action program guide (Interim)

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  2. Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

    SciTech Connect (OSTI)

    Nutt, M.; Nuclear Engineering Division

    2010-05-25

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.

  3. Action Plan - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Action Plan Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links Action Plan Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Executive Summary 1.0 Introduction 1.1 Purpose 1.2 Regulatory Authorities 1.3

  4. Management Plan for Experimental Reintroduction of Sockeye into Skaha Lake; Proposed Implementation, Monitoring, and Evaluation, 2004 Technical Report.

    SciTech Connect (OSTI)

    Wright, Howie; Smith, Howard

    2004-01-01

    Okanagan River sockeye salmon, which spawn near the town of Oliver, B.C., have their farther upstream migration limited by several water control and diversion dams. Stock numbers have been declining for many years and the Okanagan Native Alliance Fisheries Department (ONAFD) has been the principal advocate of a program to restore their numbers and range by reintroducing them into upstream waters where they may once have occurred in substantial numbers Some investigators have warned that without effective intervention Okanagan sockeye are at considerable risk of extinction. Among a host of threats, the quality of water in the single nursery areas in Osoyoos Lake. is deteriorating and a sanctuary such as that afforded in larger lakes higher in the system could be essential. Because the proposed reintroduction upstream has implications for other fish species, (particularly kokanee, the so-called ''landlocked sockeye'' which reside in many Okanagan lakes), the proponents undertook a three-year investigation, with funding from the Bonneville Power Administration and the Confederated Tribes of the Colville Reservation, to identify possible problem areas, and they committed to an interim experimental reintroduction to Skaha Lake where any problems could be worked out before a more ambitious reintroduction, (e.g. to Okanagan Lake) could be formally considered. The three-year investigation was completed in the spring of 2003. It included an assessment of risks from disease or the possible introduction of unwanted exotic species. It also considered the present quality and quantity of sockeye habitat, and opportunities for expanding or improving it. Finally ecological complexity encouraged the development of a life history model to examine interactions of sockeye with other fishes and their food organisms. While some problem areas were exposed in the course of these studies, they appeared to be manageable and the concept of an experimental reintroduction was largely supported but with the proviso that there should be a thorough evaluation and reporting of progress and results. A 2004 start on implementation and monitoring has now been proposed.

  5. Los Alamos Scientific Laboratory energy-related history, research, managerial reorganization proposals, actions taken, and results. History report, 1945--1979

    SciTech Connect (OSTI)

    Hammel, E.F.

    1997-03-01

    This report documents the development of major energy-related programs at the Los Alamos Scientific Laboratory between 1945 and 1979. Although the Laboratory`s primary mission during that era was the design and development of nuclear weapons and most of the Laboratory`s funding came from a single source, a number of factors were at work that led to the development of these other programs. Some of those factors were affected by the Laboratory`s internal management structure and organization; others were the result of increasing environmental awareness within the general population and the political consequences of that awareness; still others were related to the increasing demand for energy and the increasing turmoil in the energy-rich Middle East. This report also describes the various activities in Los Alamos, in Washington, and in other areas of the world that contributed to the development of major energy-related programs at Los Alamos. The author has a unique historical perspective because of his involvement as a scientist and manager at the Los Alamos Scientific Laboratory during the time period described within the report. In addition, in numerous footnotes and references, he cites a large body of documents that include the opinions and perspectives of many others who were involved at one time or another in these programs. Finally the report includes a detailed chronology of geopolitical events that led to the development of energy-related programs at Los Alamos.

  6. Portsmouth Proposed Plan for the Site-wide Waste Disposition Evaluation

    Energy Savers [EERE]

    Project | Department of Energy Proposed Plan for the Site-wide Waste Disposition Evaluation Project Portsmouth Proposed Plan for the Site-wide Waste Disposition Evaluation Project DOE has evaluated alternatives for managing waste that would be created by decomtamination and decommissioning of the buildings at the Portsmouth Site. Three remedial alternatives for management of anticipated Portsmouth waste were developed for consideration. This Proposed Plan describes the required no-action

  7. Energy Action Month October 2013 Poster

    Broader source: Energy.gov [DOE]

    Poster for Federal Energy Management Program (FEMP) features slogan "Take Action Now: Empower a Secure Energy Future" for October 2013 Energy Action Month.

  8. Consolidated Online Data Management Strategy in Support of Environmental Remediation Activities at the Dupont Chambers Works Formerly Utilized Sites Remedial Action Program (Fusrap) Site

    SciTech Connect (OSTI)

    Nelson, K.A.; Desai, N.B.; Samus, J.E.; Bock, G.O.

    2007-07-01

    The U.S. Army Corps of Engineers (USACE) has developed and implemented an innovative online data management application in support of site characterization and remediation activities at the DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) Site. The password-protected, web-based application was implemented to centralize project data, facilitate project communications, and provide a large and diverse group of project team members with access to the data and analytical tools they need to efficiently and effectively manage the ongoing characterization and remediation efforts. Centralizing resources using the online application and web-based strategy streamlines data access and communications, allowing the team to effectively keep the project on track while reducing the costs associated with data requests, data duplication, document review and retrieval, software requirements, and lapses in communication or data transfer. (authors)

  9. Corrective Action Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-02

    This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

  10. Chapter 2 - Proposed Action and Alternatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... material (for example, uranium and thorium series); and by-product material (for ... of plutonium, americium, uranium, thorium, and neptunium; (2) the effects of ...

  11. Notice_of_Proposed_Action.pdf

    Office of Legacy Management (LM)

  12. A New Framework for Adaptive Sampling and Analysis During Long-Term Monitoring and Remedial Action Management

    SciTech Connect (OSTI)

    Minsker, Barbara; Albert Valocchi; Barbara Bailey

    2008-01-27

    DOE and other Federal agencies are making a significant investment in the development of field analytical techniques, nonintrusive technologies, and sensor technologies that will have a profound impact on the way environmental monitoring is conducted. Monitoring and performance evaluation networks will likely be base on suites of in situ sensors, with physical sampling playing a much more limited role. Designing and using these types of networks effectively will require development of a new paradigm for sampling and analysis of remedial actions, which is the overall goal of this project.

  13. F-Area Hazardous Waste Management Facility Correction Action Report, Third and Fourth Quarter 1998, Volumes I and II

    SciTech Connect (OSTI)

    Chase, J.

    1999-04-23

    The groundwater in the uppermost aquifer beneath the F-Area Hazardous Waste Management Facility (HWMF), also known as the F-Area Seepage Basins, at the Savannah Site (SRS) is monitored periodically for selected hazardous and radioactive constituents. This report presents the results of the required groundwater monitoring program.

  14. Oak Ridge K-25 Site Technology Logic Diagram. Volume 3, Technology evaluation data sheets; Part B, Remedial action, robotics/automation, waste management

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration (ER) and waste management (WN) problems at the Oak Ridge K-25 Site. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remediation, decontamination, and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume 3 B provides the Technology Evaluation Data Sheets (TEDS) for ER/WM activities (Remedial Action Robotics and Automation, Waste Management) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than each technology in Vol. 2. The TEDS are arranged alphanumerically by the TEDS code number in the upper right corner of each data sheet. Volume 3 can be used in two ways: (1) technologies that are identified from Vol. 2 can be referenced directly in Vol. 3 by using the TEDS codes, and (2) technologies and general technology areas (alternatives) can be located in the index in the front of this volume.

  15. Proposed environmental remediation at Argonne National Laboratory, Argonne, Illinois

    SciTech Connect (OSTI)

    1997-05-01

    The Department of Energy (DOE) has prepared an Environmental Assessment evaluating proposed environmental remediation activity at Argonne National Laboratory-East (ANL-E), Argonne, Illinois. The environmental remediation work would (1) reduce, eliminate, or prevent the release of contaminants from a number of Resource Conservation and Recovery Act (RCRA) Solid Waste Management Units (SWMUs) and two radiologically contaminated sites located in areas contiguous with SWMUs, and (2) decrease the potential for exposure of the public, ANL-E employees, and wildlife to such contaminants. The actions proposed for SWMUs are required to comply with the RCRA corrective action process and corrective action requirements of the Illinois Environmental Protection Agency; the actions proposed are also required to reduce the potential for continued contaminant release. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required.

  16. APM-16-009-SC-Emergency-Management-DE-NA0002976.pdf

    National Nuclear Security Administration (NNSA)

    6-009 National Nuclear Security Administration Categorical Exclusion Determination Form Proposed Action Title: South Carolina Emergency Management Division Support Program or Field Office: APM Grant No.: DE-NA0002976 Location(s) (City/County/State): South Carolina Proposed Action Description: The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) proposes to provide financial and technical assistance South Carolina Emergency Management Division (SCEMD), Aiken,

  17. Nevada test site underground storage tank number 12-13-1: Nevada division of emergency management case number H931130E corrective action unit 450. Closure report

    SciTech Connect (OSTI)

    1997-01-01

    The project site was identified as an abandoned Underground Storage Tank (UST) to be closed under the Department of Energy/Nevada Operations Office (DOE/NV) Environmental Restoration Division (ERD) Program during Fiscal Year 1993. The United States Environmental Protection Agency (EPA) requires that before permanent closure is completed an assessment of the site must take place. The Nevada Division of Environmental Protection (NDEP) requires assessment and corrective actions for a petroleum substance in the soil which exceeds 100 milligrams per kilogram (mg/kg). Subsequent to the tank removal, a hydrocarbon release was identified at the site. The release was reported to the NDEP by DOE/NV on November 30, 1993. Nevada Division of Environmental Management (NDEM) Case Number H931130E was assigned. This final closure report documents the assessment and corrective actions taken for the hydrocarbon release identified at the site. The Notification of Closure, EPA Form 7530-1 dated March 22, 1994, is provided in Appendix A. A 45-day report documenting the notification for a hydrocarbon release was submitted to NDEP on April 6, 1994.

  18. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2010-07-19

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  19. INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

    2011-05-31

    The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

  20. Action Items

    Office of Environmental Management (EM)

    ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS...

  1. 3Q/4Q00 Annual M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwater Monitoring and Corrective-Action Report - Third and Fourth Quarters 2000 - Volumes I, II, and II

    SciTech Connect (OSTI)

    Cole, C.M. Sr.

    2001-04-17

    This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River Site (SRS) during 2000. This program is required by South Carolina Resource Conservation and Recovery Act (RCRA) Hazardous Waste Permit SC1890008989 and Section 264.100(g) of the South Carolina Hazardous Waste Management Regulations.

  2. 1Q/2Q00 M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwater Monitoring and Corrective-Action Report - First and Second Quarters 2000 - Volumes I, II, and II

    SciTech Connect (OSTI)

    Chase, J.

    2000-10-24

    This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River site (SRS) during first and second quarters of 2000.

  3. RAPIDD Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RAPIDD Proposals Print The combined process for Rapid Access Proposals, Industry, and Director's Discretion (RAPIDD) beam time accommodates users who require limited or rapid access to ALS beam time. There are a number of proposal types that are available on a variety of beamlines, as described below. Log in to ALSHub to submit a RAPIDD proposal. The RAPIDD process is not suitable for users requiring significant beam time for an extended program of research or those wanting to perform complex

  4. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation ...

  5. Final Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Residential Exchange Program FY 16-17 ASC Utility...

  6. Final Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings...

  7. United States Forest Service - Forest Service Schedule of Proposed...

    Open Energy Info (EERE)

    Actions Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: United States Forest Service - Forest Service Schedule of Proposed Actions Abstract The...

  8. Corrective Action Tracking System User's Guide | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes...

  9. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are already in place that mitigate that risk, and propose additional controls if needed. Step 1: Identify Risks - What can go wrong? This step should identify the negative outcomes that could result from an action or decision . It is important to consider a wide range of risks, and so the Department's ERM framework includes

  10. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect (OSTI)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  11. EIS-0389: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Plan EIS-0389: Mitigation Action Plan Trinity Public Utilities District Direct Interconnection Project Western Area Power Administration (Western) proposes to...

  12. ES H action plan

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  13. Corrective Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Corrective Action Complete is demonstrated by one of the following: Eliminate Exposure (11 SMAs, 16 Sites) SMA SITE Submittal Date Document 2M-SMA-2.2 03-003(k) September...

  14. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:www.nnsa.energy.govaboutusouroperationsmanagementandbudget

  15. Proposed Rules

    National Nuclear Security Administration (NNSA)

    4414 Federal Register / Vol. 78, No. 209 / Tuesday, October 29, 2013 / Proposed Rules NRC about the availability of information for the proposed Waste Confidence rule and DGEIS. You may access publicly available information related to these documents by any of the following methods: * Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0246. * NRC's Waste Confidence Web site: Go to http://www.nrc.gov/waste/spent- fuel-storage/wcd.html. * NRC's

  16. Action Codes Table | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Blog Home About Us Our Programs Defense Nuclear Security Nuclear Materials Management & Safeguards System NMMSS ... Action Codes Table U.S. Department of Energy ...

  17. Unsolicited Proposals

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-02-27

    The order sets forth Department of Energy (DOE) requirements and responsibilities for the receipt, processing, and review of unsolicited proposals (USPs). To ensure that those submitting USPs are notified in a timely manner of the status (e.g., pending, accepted for funding, or declined) of their Supersedes DOE O 542.2. Certified 12-28-06.

  18. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:nnsa.energy.govaboutusouroperationsmanagementandbudget

    P...

  19. Energy Department Issues Draft Request For Proposal for the Environmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Environmental Management Headquarters Information Technology Services Procurement Energy Department Issues Draft Request For Proposal for the Environmental Management ...

  20. PRESENTATION: OVERVIEW OF PROPOSED "DARPA-INSPIRED" APPROACH...

    Office of Environmental Management (EM)

    PROPOSED "DARPA-INSPIRED" APPROACH TO ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT PRESENTATION: OVERVIEW OF PROPOSED "DARPA-INSPIRED" APPROACH TO ENVIRONMENTAL MANAGEMENT ...

  1. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  2. Management Alert - The 2020 Vision One System Proposal for Commissioning and Startup of the Waste Treatment and Immobilization Plant, IG-0871

    Energy Savers [EERE]

    Energy Commercial Buildings » Manage Organizational Energy Use in a Commercial Building Manage Organizational Energy Use in a Commercial Building Photo of participants listening to a speaker at the Commercial Building Energy Alliances Executive Exchange with Commercial Building Stakeholders forum at the National Renewable Energy Laboratory (NREL) in Golden, Colorado, on May 24, 2012. Integrating ongoing energy efficiency upgrades for your commercial building(s) into the fabric of your

  3. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect (OSTI)

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  4. DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and ...

  5. The President`s Floodplan Management Action Plan: Formulating a watershed and ecosystem approach to flood hazard mitigation and resource protection

    SciTech Connect (OSTI)

    McShane, J.

    1995-12-01

    The Great Midwest Flood of 1993 focused the attention of the Nation on the human and environmental costs associated with decades of efforts to control flooding, unwise land-use decisions, and the loss and degradation of the natural resources and functions of floodplains. The disaster can also be attributed to the single purpose decision-making process and fragmented planning at all levels of government, inconsistent statutory madates, and conflicting jurisdictional responsibilities. The Executive Office of the President established a Floodplain Management Review Committee to determine the major causes and consequences of the flood and to evaluate the performance of existing floodplain management and related watershed programs. The report, Sharing the Challenge: Floodplain Management into the 21st Century, included 90 recommendations to improve floodplain management and water resources planning including the need for a more comprehensive, coordinated approach to floodplain and watershed management. Preparation of the 1994 document A Unified National Program for Floodplain Management commenced prior to the Midwest Flood of 1993 and was completed, coincidentally, concurrently with the Review Committee`s report Sharing the Challenge. Both reports urge the formulation of a more comprehensive, watershed approach to managing human activities and protecting natural systems to ensure the long term viability of riparian ecosystems and the sustainable development of riverine communities. Both reports recognize that effective floodplain management will reduce the financial burdens placed upon all levels of government to compensate property owners and governments for flood losses caused by unwise land use decisions by individuals, as well as governments. This paper focuses on the fundamental changes in Federal floodplain management policies and programs that are emerging that will affect how as a Nation manage and use our floodplain resources into the 21st Century.

  6. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T-1 Cumulative Impacts Effects on the environment that result from the proposed action when added to other past, present, and reasonably foreseeable future actions, regardless of what agency or person undertakes such other actions (40 CFR 1508.7). APPENDIX T SUPPORTING INFORMATION FOR THE SHORT-TERM CUMULATIVE IMPACT ANALYSES This appendix contains the detailed tables that support the short-term cumulative impacts presented in Chapter 6 of this Tank Closure and Waste Management Environmental

  7. Defining the no action alternative for NEPA document of continuing actions

    SciTech Connect (OSTI)

    McCold, L.N.; Saulsbury, J.W.

    1995-12-01

    Environmental professionals today must address many issues that might not have been foreseen by developers of the National Environmental Policy Act of 1969 (NEPA) or the President`s Council on Environmental Quality (CEQ) regulations for implementing NEPA. One issue is the definition of the no action alternative for NEPA documentation of continuing actions. The CEQ regulations do not define the no action alternative, but merely state that NEPA analyses shall {open_quotes}include the alternative of no action{close_quotes}. For NEPA analyses of newly proposed actions, the practical definition of the no action alternative is clear (i.e., the agency will not implement the proposed action or alternative actions). However, the practical definition for NEPA analyses of continuing actions is not so clear. To clarify the definition of the no action alternative for continuing actions, particularly those that involve agency decisions about relicensing existing projects or continuing to operate existing programs or facilities. In trying to clarify the definition of the no action alternative for continuing actions, this paper examines the function of the no action alternative for NEPA analyses in general. Pertinent issues include how the definition of the no action alternative affects the selection of the baseline for environmental analysis and whether inclusion of the no action alternative really forces agencies to consider no action as a realistic alternative. To address these issues, this paper begins with a discussion of relevant legal decisions involving the no action alternative in NEPA analyses. The paper then examines some agency NEPA regulations and recent NEPA documents to provide examples of how some agencies address the no action alternative for continuing actions. Finally, the paper suggests definitions of the no action alternative for continuing actions and methods for addressing no action as a realistic alternative.

  8. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  9. Using OSHA`s requirement for the revalidation of PHA`s to comply with EPA`s proposed risk management rule

    SciTech Connect (OSTI)

    Him, M.S.; Mannan, M. [RMT/Jones and Neuse, Inc., Austin, TX (United States)

    1996-11-01

    OSHA`s Process Safety Management rule not only requires the performance of process hazards analyses (PHA`s) of covered areas, but the revalidation of these PHA`s every 5 years. With the May 26, 1997 deadline for the completion of initial PHA`s nearing and the pending approval on or before March 1996 of EPA`s Risk Management Programs (RMP) for Chemical Accidental Release Prevention ({section}40 CFR 68), PSM-covered facilities must start developing plans for compliance with one or more of the requirements of these regulations. This paper discusses some of the strategies that companies falling under Tier 3 of EPA`s RMP rule may use to comply with OSHA`s revalidation of PHA`s and the upcoming EPA rule. The paper also provides details on the use of other PSM elements for PHA revalidation (such as compliance audits and management of change), the development of schedules for PHA revalidation, preparation time, the revalidation process, and the documentation/identification of RMP hazard scenarios.

  10. Using OSHA`s requirement for the revalidation of PHA`STo comply with EPA`s proposed risk management rule

    SciTech Connect (OSTI)

    Him, M.S.; Mannan, M. [RMT/Jones & Neuse, Inc., Austin, TX (United States)

    1996-08-01

    OSHA`s Process Safety Management rule not only requires the performance of process hazards analyses (PHA`s) of covered areas, but the revalidation of these PHA`s every 5 years. With the May 26, 1997 deadline for the completion of initial PHA`s nearing and the pending approval on or before March 1996 of EPA`s Risk Management Programs (RMP) for Chemical Accidental Release Prevention ({section}40 CFR 68), PSM-covered facilities must start developing plans for compliance with one or more of the requirements of these regulations. This paper discusses some of the strategies that companies falling under Tier 3 of EPA`s RMP rule may use to comply with OSHA`s revalidation of PHA`s and the upcoming EPA rule. The paper also provides details on the use of other PSM elements for PHA revalidation (such as compliance audits and management of change), the development of schedules for PHA revalidation, preparation time, the revalidation process, and the documentation/identification of RMP hazard scenarios.

  11. Enforcement actions: Significant actions resolved individuals actions. Semiannual progress report, July--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July - December 1996) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to-these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  12. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1997--June 1997

    SciTech Connect (OSTI)

    1997-09-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (January - June 1997) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  13. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 TC & WM EIS Proposed Actions (1) Retrieve, treat, and dispose of waste in single-shell tank (SST) and double-shell tank (DST) farms and close the SST system. (2) Decommission the Fast Flux Test Facility, manage the resulting waste, and manage the disposition of the Hanford Site's (Hanford's) inventory of bulk sodium. (3) Manage waste from tank closure and other Hanford activities, as well as limited volumes received from U.S. Department of Energy sites. CHAPTER 2 PROPOSED ACTIONS AND

  14. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 1 PROPOSED ACTIONS: BACKGROUND, PURPOSE AND NEED Chapter 1 describes the background, purpose and need for the agency action presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS). Section 1.1 provides summary information on the size and distribution of the waste inventory at the Hanford Site (Hanford), the specific objectives of this TC & WM EIS, and the regulatory basis for the proposed

  15. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  16. Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Mark Krause

    2010-08-01

    This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: Determine whether COCs are present. If COCs are present, determine their nature and extent. Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is recommended for the remaining 10 CASs in CAU 562. A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.

  17. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  18. Desk study of the proposed Petroleum Resource Management and Assessment project for the Western Siberia Administration, Russia. Volume 1. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1992-05-15

    The United States Trade and Development Program (TDP) is considering the provision of funds to allow a U.S. firm or firms to be hired to conduct a feasibility study on a Petroleum Resource Management and Assessment project in Russia's West Siberian Basin. To evaluate whether or not to fund the study, TDP contracted a Desk Study to evaluate the concept of the project; cost out the scope of work for the feasibility study; estimate the potential exports of U.S. equipment and services during project implementation; and make a recommendation as to whether TDP should fund the study. The goal of the feasibility study would be to stem the rapid decline in oil and gas production which has resulted in a well-publicized hard currency crisis.

  19. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  20. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  1. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  2. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  3. 3Q/4Q99 F-Area Hazardous Waste Management Facility Corrective Action Report - Third and Fourth Quarter 1999, Volumes I and II

    SciTech Connect (OSTI)

    Chase, J.

    2000-05-12

    Savannah River Site (SRS) monitors groundwater quality at the F-Area Hazardous Waste management Facility (HWMF) and provides results of this monitoring to the South Carolina Department of Health and Environmental Control (SCDHEC) semiannually as required by the Resource Conservation and Recovery Act (RCRA) permit. SRS also performs monthly sampling of the Wastewater Treatment Unit (WTU) effluent in accordance with Section C of the Underground Injection Control (UIC) application.

  4. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of ...

  5. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork ...

  6. Department of Energy Proposed Agency Information Collection:...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy proposed Agency Information Collection: The Department of Energy (DOE) invites public comment on DOE's request to the Office of Management and Budget (OMB) to...

  7. Corrective Action Tracking System (CATS) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The CATS web-based database is used to enter, track, and report the status of corrective actions developed and implemented in the DOE Corrective Action Management Program (CAMP) to...

  8. Action Codes Table | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Action Codes Table U.S. Department of Energy / U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards System Action Codes Table Action codes *U.S.: **IAEA: A - Shipper's original data A B - Receiver's data accepting shipper's weights without measurement W C - Shipper's adjustment or acknowledgement C D - Receiver's adjustment or acknowledgement W, Z E - Receiver's independent measurement or determination W, Z I - Inventory difference explanation data *Historical -

  9. Management's Discussion & Analysis Profile

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adjusted Net Revenue is net revenue after removing the effects of certain debt management actions, in particular the Debt Service Reassignment, from prior years. These debt...

  10. Defining the no-action alternative for National Environmental Policy Act analyses of continuing actions

    SciTech Connect (OSTI)

    McCold, L.N.; Saulsbury, J.W.

    1998-01-01

    The Council on Environmental Quality (CEQ) regulations for implementing the National Environmental Policy Act of 1969 (NEPA) do not define the no-action alternative, stating only that EPA analyses shall include the alternative of no action. The definition of the no-action alternative for newly proposed actions seems clear. However, for continuing actions, the meaning of the no-action alternative is ambiguous. This article examines the overall function of the no-action alternative for NEPA analyses of continuing actions. It begins with a discussion of the conflicting definitions of the no-action alternative for continuing activities, including CEQ regulations and guidelines related to the no-action alternative and legal decisions that have helped establish precedence for defining no action. A review of NEPA regulations and guidelines of 10 federal agencies shows how different agencies define no-action for continuing actions. Review of six recent NEPA documents on continuing actions reveals how their definition of the no-action alternative promote or impede informed decision-making.

  11. 1995 Department of Energy Records Management Conference

    SciTech Connect (OSTI)

    1995-07-01

    The Department of Energy (DOE) Records Management Group (RMG) provides a forum for DOE and its contractor personnel to review and discuss subjects, issues, and concerns of common interest. This forum will include the exchange of information, and interpretation of requirements, and a dialog to aid in cost-effective management of the DOE Records Management program. Issues addressed by the RMG may result in recommendations for DOE-wide initiatives. Proposed DOE-wide initiatives shall be, provided in writing by the RMG Steering Committee to the DOE Records Management Committee and to DOE`s Office of ERM Policy, Records, and Reports Management for appropriate action. The membership of the RMG is composed of personnel engaged in Records Management from DOE Headquarters, Field sites, contractors, and other organizations, as appropriate. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  12. EA-1993: Proposed High Explosive Science & Engineering Project...

    Office of Environmental Management (EM)

    The proposed action would be to design, construct, and operate a High Explosive Science ... scientific staff and supporting computational and experimental capabilities as well ...

  13. EIS-0337: West Valley Demonstration Project Waste Management

    Broader source: Energy.gov [DOE]

    The purpose of the Final West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy’s proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities.

  14. Texas Solar Collaboration Action Plan

    SciTech Connect (OSTI)

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energy’s new 2013 solar program processes; Continue to discuss “downtown grid” interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  15. Los Alamos National Security Corrective Action Plan - Radiological Release

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phase II | Department of Energy Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security Corrective Action Plan - Radiological Release Phase II PDF icon Los Alamos National Security Corrective Action Plan - Radiological Release Phase II More Documents & Publications Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II

  16. Action plan for the Tiger Team assessment report

    SciTech Connect (OSTI)

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  17. Implementation Proposal for the National Action Plan on Demand Response -

    Energy Savers [EERE]

    Imperial Valley Renewable Energy Summit Imperial Valley Renewable Energy Summit The Energy Department's Geothermal Technologies Office presented on major funding initiatives in 2015 at the eighth annual Imperial Valley Renewable Energy Summit, in southern California in March. Laura Garchar - science and technology policy fellow through DOE's Institute for Science and Education at Oak Ridge, Tennessee (ORISE) - presented. click below for the full presentation PDF icon IVRES

  18. Chromium Project Notice of Proposed Floodplain Action Public...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office has prepared a Draft Environmental Assessment for the Chromium Plume Control Interim Measure and Plume-Center Characterization at the Los Alamos National Laboratory (LANL). ...

  19. EIS-0385: Notice of Proposed Floodplain and Wetland Actions ...

    Broader source: Energy.gov (indexed) [DOE]

    Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by...

  20. Property:NEPA Proposed Action | Open Energy Information

    Open Energy Info (EERE)

    line (Alternative D) or two parallel lines (Alternative E) running 63 miles from the Red Substation near Killdeer to the new White Substation and on to the Blue Substation and...

  1. QER- Comment of Berkshire Environmental Action Team

    Broader source: Energy.gov [DOE]

    Dear members of the Quadrennial Energy Review Task Force, Please find attached comments from the Berkshire Environmental Action Team, Inc. (BEAT) regarding the proposed natural gas pipeline expansion. Thank you for considering our comments.

  2. Notice of OMB Action Approving DOE Submission to Extend Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) ...

  3. POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Personnel Management (OPM), effective September 12, 2010, requires agencies to officially document detail actions. As a result, all Servicing Human Resources Offices ...

  4. EAC Recommendations for DOE Action Regarding Development of the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next...

  5. Take Action Now: Empower a Secure Energy Future

    Broader source: Energy.gov [DOE]

    Document features a Federal Energy Management Program (FEMP) template for creating a Take Action Now: Empower a Secure Energy Future campaign handout.

  6. Take Action Now: Empower a Secure Energy Future 2

    Broader source: Energy.gov [DOE]

    Document features a Federal Energy Management Program (FEMP) template for creating a Take Action Now: Empower a Secure Energy Future 2 handout.

  7. Guidance on NEPA Review for Corrective Actions under the Resource...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." ...

  8. Kenya-Action Plan for National Climate Change Response Strategy...

    Open Energy Info (EERE)

    these proceedings, CDKN is managing a procurement process to identify potential suppliers who may be interested in delivering this exciting and challenging Action Plan with...

  9. Energy Department Issues Request For Proposal for the Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement Energy Department Issues Request For Proposal for the Environmental ...

  10. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  11. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-12

    The purpose of this guide is to describe effective risk management processes. The continuous and iterative process includes updating project risk documents and the risk management plan and emphasizes implementation communication of the risks and actions taken.

  12. Building Actionable Climate Action Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Actionable Climate Action Plans Building Actionable Climate Action Plans Transcript PDF icon Presentation More Documents & Publications Partnering with Utilities Part 2: ...

  13. BPA's proposed oversupply management protocol, Attachment P,...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    levels measured by the U.S. Army Corps of Engineers exceed Oregon and Washington water quality standards at projects that are spilling past unloaded turbines, the Transmission...

  14. BPA's Proposed Oversupply Management Protocol Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA developed and implemented its Interim Environmental Redispatch (ER) and Negative Pricing Policy to reduce TDG in May 2011. - BPA temporarily limited the output of wind...

  15. EIS-0384: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    project designers and reviewers minimized short-term and long-term environmental and social impacts of the Proposed Action through project design, consultation with regulatory...

  16. Mitigation Action Plans (MAP) and Related Documents | Department...

    Broader source: Energy.gov (indexed) [DOE]

    EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi March 10, 2010...

  17. EIS-0425: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental...

  18. Corrective Actions Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Cleanup » Corrective Actions Corrective Actions Process The general process for evaluating and remediating potential release sites is called the corrective action process. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Corrective actions The Laboratory's corrective actions process refers to the way in which the Laboratory investigates, stabilizes,

  19. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals LANSCE accepts proposals for the Lujan Neutron Scattering Center, Proton Radiography (pRad) and the Weapons Neutron Research Facility (WNR). Calls for proposals are typically issued twice a year, for each run cycle of the accelerator. Deadlines will be posted. Lujan Center pRad WNR Lujan Center call for proposals is open. Proposal Submission Read the Lujan Center call for proposals. Deadline: May 21, 2016, 5:00 p.m. (MDT) Unclassified Proposal Submission: Unclassified proposals must be

  20. Enforcement actions: Significant actions resolved material licensees. Semiannual progress report, July--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  1. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  2. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)

    SciTech Connect (OSTI)

    N /A

    2001-05-01

    BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

  3. Report: EMAB Acquisition and Project Management Subcommittee...

    Broader source: Energy.gov (indexed) [DOE]

    and contract management. On November 2, a very comprehensive report (124 pages) outlining continuous improvement actions in acquisition and project management was approved by Dr....

  4. Enforcement actions: Significant actions resolved. Volume 14, No. 2, Part 1: Individual actions. Quarterly progress report, April--June 1995

    SciTech Connect (OSTI)

    1995-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1995) and includes copies of Orders sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  5. Transformational Energy Action Management (TEAM) Wireless Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Contributors Contributors Wayne Manges, Oak Ridge National Laboratories Elliott Levine, DOE Teja Kuruganti, Oak Ridge National Laboratories Brian Kaldenbach, Oak Ridge ...

  6. Corrective Action Plan for Environmenta' Management Headquarters

    Office of Environmental Management (EM)

    2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14 2014 ... 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 ...

  7. Corrective Action Plan (CAP) 2008 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corrective Action Plan (CAP) 2008 Corrective Action Plan (CAP) 2008 The Root Cause Analysis Corrective Action Plan ensures that the root causes identified in the Root Cause Analysis report are addressed with meaningful and lasting solutions in order to improve contract and project management performance. PDF icon Corrective Action Plan (CAP) 2008 Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications Layout 1 National Defense

  8. NREL: Climate Neutral Research Campuses - Implementing the Climate Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered. How do we pay for climate actions? And, who will manage and oversee implementation of the plan? The answer to each question will be specific to your campus. Narrow climate action plans focus on incremental savings through low-cost and voluntary measures. This approach begs the question about what should be done after the short-term,

  9. 2014 Joint Action Workshop

    Broader source: Energy.gov [DOE]

    The Joint Action Workshop is an annual event for joint action agencies and their members to meet informally and discuss emerging policy, regulatory, and power supply issues, and other topics...

  10. Call for Proposal Submissions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call for Proposal Submissions The Request for Proposals for the JLF User Program for experiments in Calendar Year 2016 has closed. The Request for Proposals for experiments in Calendar Year 2017 will open in the summer of 2016

  11. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  12. Mitigation Action Plan

    Energy Savers [EERE]

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  13. Trident Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trident Call for Proposals Trident Call for Proposals Enabling world-class science in high-energy density physics and fundamental laser-matter interactions Contact Operations Team ...

  14. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    prad. Timeline Deadline for proposals is 5 pm (MST) Wednesday, March 15, 2016. Oral presentations by the proposers to the Program Advisory Committee (PAC) will be...

  15. Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    prad. Timeline Deadline for proposals is 5 pm (MST) Wednesday, March 15, 2016. Oral presentations by the proposers to the Program Advisory Committee (PAC) will be...

  16. NETL: Unsolicited Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) as outlined in...

  17. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  18. ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE

    Office of Legacy Management (LM)

    ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE PROPOSED INTERIM REMEDIAL ACTIONS FOR FY 1983-85 ACCELERATED PROGRAM (1984 VICINITY PROPERTIES CLEANUP) Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois July 1984 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee CONTENTS Page SUMMARY OF PROPOSED ACTION AND RELATED ACTIVITIES ........... 1 HISTORY AND ENVIRONMENTAL SETTING

  19. Guidance on the Consideration of Past Actions in Cumulative Effects

    Energy Savers [EERE]

    Analysis (CEQ, 2005) | Department of Energy on the Consideration of Past Actions in Cumulative Effects Analysis (CEQ, 2005) Guidance on the Consideration of Past Actions in Cumulative Effects Analysis (CEQ, 2005) In this Memorandum, the Council on Environmental Quality provides guidance on the extent to which agencies of the Federal government are required to analyze the environmental effects of past actions when they describe the cumulative environmental effect of a proposed action. PDF

  20. Environmental impacts of proposed Monitored Retrievable Storage

    SciTech Connect (OSTI)

    Scharber, Wayne K.; Macintire, H. A.; Davis, Paul E.; Cothron, Terry K.; Stephens, Barry K.; Travis, Norman; Walter, George; Mobley, Mike

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  1. EAC Recommendations for DOE Action Regarding Development of the Next

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generation Grid Operating System (Energy Management System) - October 17, 2012 | Department of Energy Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System, approved at the October 15-16, 2012 EAC

  2. CONFIGURATION CHANGE PROPOSAL FORM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CONFIGURATION CHANGE PROPOSAL FORM CONFIGURATION CHANGE PROPOSAL FORM This form is used for sharing information on Domain Name Server (DNS) changes, new requirements, modifications or enhancements within the DOE Headquarters Programmatic and Office Management Areas. Microsoft Office document icon This form is used for sharing information on Domain Name Server (DNS) changes, new requirements, modifications or enhancements within the DOE Headquarters Programmatic and Office Management Areas. More

  3. Negotiating equity for management of DOE wastes

    SciTech Connect (OSTI)

    Carnes, S.A.

    1994-09-01

    One important factor frustrating optimal management of Department of Energy (DOE)-complex wastes is the inability to use licensed and permitted facilities systematically. Achieving the goal of optimal use of DOE`s waste management facilities is politically problematic for two reasons. First, no locale wants to bear a disproportionate burden from DOE wastes. Second, the burden imposed by additional wastes transported from one site to another is difficult to characterize. To develop a viable framework for equitably distributing these burdens while achieving efficient use of all DOE waste management facilities, several implementation and equity issues must be addressed and resolved. This paper discusses stakeholder and equity issues and proposes a framework for joint research and action that could facilitate equity negotiations among stakeholder and move toward a more optimal use of DOE`s waste management capabilities.

  4. Trident Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trident Call for Proposals Trident Call for Proposals Enabling world-class science in high-energy density physics and fundamental laser-matter interactions Contact Operations Team Leader Randy Johnson (505) 665-5089 Email Trident Governing Board Contact Ray Leeper (505) 667-3653 Email Call for Proposals 2015-2016 The Trident Laser Facility is accepting proposals for experiments to be performed at the facility during the period October 2015 through September 2016. All proposals submitted are

  5. PROPOSAL PREPARATION INSTRUCTIONS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-08RV14800 Modification No. A015 PROPOSAL PREPARATION INSTRUCTIONS 1. INTRODUCTION This document contains instructions to the contractor for the preparation of a proposal in response to the modification of the contract which defines work that will be funded by and performed under the provisions of the American Recovery and Reinvestment Act (Recovery Act). The contractor shall provide a written proposal consisting of a Technical Proposal and a Cost and Fee Proposal. The

  6. OFFEROR'S PROPOSAL LETTER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RFP OPL (Rev. 4, 8/4/15) RFP Offeror's Proposal Letter Initials: Page 1 of 4 OFFEROR'S PROPOSAL LETTER In response to the Solicitation, also known as request for proposal (RFP), referenced below, and in accordance with the accompanying solicitation provisions, any addenda thereto and the terms and conditions of the proposed subcontract, the Offeror identified below (hereinafter referred to as OFFEROR) proposes to furnish all plant, labor, technical and professional services, supervision,

  7. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals dotline Lujan Center: Material Science FY17 Call for Proposals Proposal Submission: https://www.lanl.gov/orgs/lansce/ Lujan Center Call for Proposals is Open. Deadline: May 21, 2016 at 5:00 pm (MDT). lansce.lanl.gov lansce.lanl.gov/lujan The Los Alamos Neutron Science Center (LANSCE) invites proposals for material science experiments at the Lujan Center addressing science of NNSA and LANL programmatic interest for the September 2016 - February 2017 run cycle. The Lujan Center utilizes

  8. Action Item Review and Status

    Office of Environmental Management (EM)

    Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project...

  9. DOE Office of Environmental Management Project and Contract Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Improvement Timeline | Department of Energy Acquisition » DOE Office of Environmental Management Project and Contract Management Improvement Timeline DOE Office of Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. View some highlights of EM's improvement actions here. PDF icon DOE Office of Environmental Management Contract and Project

  10. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP AIB Report » Status of Corrective Actions Status of Corrective Actions at LANL Department of Energy Issues Accident Investigation Board (AIB) Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions Undertaken by Los Alamos National Laboratory though a collaborative effort led by the Associate Director for Environmental Safety and Health (ADESH), the Associate Director for

  11. SEAB Climate Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

  12. Climate Action Champions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southeast Florida Regional Climate Compact 10 - Cities 4 - CountiesRegional Collaborative ... Technology transfer of smart grid advances to support the White House actions to respond ...

  13. Notes and Action Items

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rick Kendall, Tom Kitchens, Horst Simon SubCommittee on Visualization and Graphics Software Responsibility: JN Leboeuf, Judy Giarrusso, Steve Jardin, and Steve Lau Actions:...

  14. Remedial Action Performed

    Office of Legacy Management (LM)

    ... action, e.g., for inclusion in local land records. ... safety, and health, including requirements of DOE orders. ... petroleum and natural gas products that preexist in ...

  15. ARM - Status and Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status and Actions Campaign Details News Field Participants Resources Status and Actions ARM Data Discovery Browse Data Status and Actions For up-to-date campaign action, please see News 28.JUN.07 Requests for all field participants: Please place your preliminary data on the CHAPS ftp site no later than December. Connor Flynn has worked with ARM colleagues to give us a password protected FTP site. If you haven't received the instructions already from Connor regarding how to access the site,

  16. Protective Actions and Reentry

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

  17. Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    K. B. Campbell

    2002-06-01

    This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are inactive or abandoned. However, some leachfields may still receive liquids from runoff during storm events. Results from the 2000-2001 site characterization activities conducted by International Technology (IT) Corporation, Las Vegas Office are documented in the Corrective Action Investigation Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. This document is located in Appendix A of the Corrective Action Decision Document for CAU 262. Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. (DOE/NV, 2001).

  18. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  19. Requests for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complex | Department of Energy Requests for Proposal- Carlsbad Field Office and NNSA National Security Complex Requests for Proposal- Carlsbad Field Office and NNSA National Security Complex January 13, 2015 - 11:14am Addthis Two requests for proposals (RFP) were recently announced by the U.S. Department of Energy: The U.S. Department of Energy (DOE) has issued a Draft Request for Proposal (RFP) for a technical assistance contract acquisition at the Carlsbad Field Office in New Mexico. A

  20. ARM - Funded Research Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Proposals Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional &...

  1. Submit CSES Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Submit Proposals Submit CSES Proposals High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email FY16 Call for Proposals period is now closed. The Center for Space and Earth Science (CSES) at Los Alamos National Laboratory (LANL) annually solicits proposals in the disciplines of geoscience, climate,

  2. Natural resource management activities at the Savannah River Site. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

  3. Full Proposal Instructions_2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Full Proposal Instructions NIF Facility Time Proposal Please prepare your full proposal according to the following instructions. Append biographical sketches(CVs) for the Principal Investigator (PI) and no more than 5 additional key team members to the end of this proposal. Submission Deadlines: Save the entire document as a single file in pdf format, and submit via the Web submission tool before 11:59 p.m. on September 1, 2015, PDT. I. COVER SHEET: (1 page) 1) Please provide the proposal title,

  4. WREP Mitigation Action Plan

    Energy Savers [EERE]

    Electrical Interconnection of the Whistling Ridge Energy Project 1 Mitigation Action Plan June 2015 Mitigation Action Plan for the Whistling Ridge Energy Project Measure Implementation Timeline Implementation Responsibility Earth (geology, soils, topography, and geologic hazards) Prior to Project construction, confirm subsurface soil and rock types and strength properties through a detailed geotechnical investigation of the specific locations of all wind Project elements, including wind

  5. REP-12 Final Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings...

  6. Strategic Energy Management

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) SEE Action Network and Weatherization and Intergovernmental Program Technical Assistance Program sponsored this webinar about strategic management in the public sector on November 7, 2012.

  7. Enforcement actions: Significant actions resolved reactor licensees. Semiannual progress report, July 1996--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July-December 1996) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  8. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals (GUPs) Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research Team (PRT) that operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the beamline scientist or the local contact listed in the tables, for additional information about the beamline. You can

  9. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General User Proposals (GUPs) Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research Team (PRT) that operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the beamline scientist or the local contact listed in the tables, for additional information about the

  10. Request for Proposals Number RHB-5-52483

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 National Renewable Energy Laboratory Managed and Operated by the Alliance for Sustainable Energy, LLC Request for Proposals Number RHB-5-52483 "Subsurface Utility Engineering...

  11. Proposals and Design Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals and Design Reports Proposals and Design Reports Proposal (1/2/04) Proposal Addendum (29/3/04) Physics Case and Detector Technology Report (12/04) Technical Design Report (7/06) Reviews DOE CD-4 DOE 2008 DOE CD-3b CD-3b Readiness DOE CD-1/2/3a CD-2/3a Readiness CD-1 Readiness PAC Report (4/05) Approvals FNAL PAC Approval: April 15, 2004 DOE Critical Decision 1,2,3a (Performance Baseline, Construction Start) Approval: March 30, 2007 DOE Critical Decision 4 (Project Completion) Approval:

  12. Categories for IGPPS Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on an independent, revolutionary scientific idea that has Los Alamos National Laboratory mission relevance. The proposed work must not be related to the programmatic research...

  13. 2015 Electricity Form Proposals

    Gasoline and Diesel Fuel Update (EIA)

    Quarterly Electricity Imports and Exports Report (EIA-111) OMB Clearance Renewal in 2015 ... Report (EIA-111) survey on August 26, 2015. The initial proposals were announced to ...

  14. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the...

  15. General User Proposal Scores

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Scores Print Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beam time requests exceed available beam time, a cutoff score is assigned after which no beam time is allocated. Individual Beam

  16. Guidance on NEPA Review for Corrective Actions under the Resource

    Energy Savers [EERE]

    Conservation and Recovery Act (RCRA) (DOE, 1997) | Department of Energy Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) (DOE, 1997) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) (DOE, 1997) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a

  17. EA-1562-SA-1: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1562-SA-1: Mitigation Action Plan Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington (Mitigation Action Plan for Phase II Build Out, North Federal Campus, PNNL Site) This mitigation plan describes the compensatory mitigation and monitoring commitments under DOE resource management guidelines for the clearing and grading, and subsequent loss of mature shrub-steppe habitat associated with Phase II

  18. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions...

  19. Notices ACTION: Notice.

    Office of Environmental Management (EM)

    8867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  20. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  1. Contract and Project Management Improvement (CPMI) Closure Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract and Project Management Root Cause Analysis Corrective Action Plan (CAP), which identified the 10 most significant issues DOE faced in managing its contracts and projects. ...

  2. Climate Action Champion: Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    betterbuildings Climate Action Champion: Technical Assistance to the City of Seattle Planning for Seattle's new Building Energy Code Overview The City of Seattle, identified as a Climate Action Champion (CAC) by the Department of Energy (DOE), is revising its 2012 Energy Code, already one of the most progressive in the country. Seattle has made a pledge to be carbon neutral by 2050. Seattle received technical assistance from the Pacific Northwest National Laboratory in order to develop a

  3. Wong's equations and the small x effective action in QCD (Journal...

    Office of Scientific and Technical Information (OSTI)

    Wong's equations and the small x effective action in QCD Citation Details In-Document Search Title: Wong's equations and the small x effective action in QCD We propose a new form ...

  4. Proposed Rules Federal Register

    Energy Savers [EERE]

    28518 Vol. 77, No. 94 Tuesday, May 15, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to

  5. Proposed Rules Federal Register

    Energy Savers [EERE]

    31548 Vol. 77, No. 103 Tuesday, May 29, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of extension of public comment period. SUMMARY: This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory

  6. proposed berm design

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    project management NNSA projects win Secretary's Achievement Awards for cost savings and efficiency NNSA was presented with two Department of Energy Secretary's Achievement Awards at a ceremony in Arlington, Va., on Wednesday. The awards, presented by Deputy Secretary of Energy Elizabeth Sherwood-Randall, commend NNSA on delivering the Y-12 Nuclear Facility Risk Reduction Project $5.7... NNSA's G2 Management Information System Wins Association for Enterprise Information's (AFEI) "Excellence

  7. Remedial action planning for Trench 1

    SciTech Connect (OSTI)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  8. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  9. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  10. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  11. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  12. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  13. ARM - AAF Proposal Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    address aerosol-cloud interactions (i.e., studies of aerosol indirect effect, CCN, IN, etc.) or aerosol-radiation interactions. AAF is expecting to award five to six proposals with...

  14. 2015 Electricity Form Proposals

    Gasoline and Diesel Fuel Update (EIA)

    (Photovoltaic) Survey Forms November 19, 2015 In early 2016 the U.S. Energy Information ... Details will be provided closer to that date. Proposed changes as of December 2015 Forms ...

  15. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    its recommendations to the ALS Division Director. A letter will be sent to the PIs of successful proposals specifying the percentage of beam time and the period of the AP. The...

  16. Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington--Frequent Asked Questions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Final TC & WM EIS) (DOE/EIS-0391) Frequently Asked Questions What are the U.S. Department of Energy (DOE) proposed actions in the Final TC & WM EIS? The Final TC & WM EIS (DOE/EIS-0391) evaluates three sets of proposed actions, as follows: Retrieve and treat the waste remaining in 177 underground storage tanks; store the high-level radioactive waste (HLW); dispose of

  17. Proposal Study Panels

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Study Panels Print Two Proposal Study Panels (PSPs) exist at the ALS: one for the general sciences and one for structural biology. The role of the PSPs is desribed in User Policy. Note: Users are urged NOT to contact any members of the panels directly. Current members of the general sciences PSP, as of April 2016, are Masa Fukuto, Brookhaven National Laboratory Carol Hirschmugl, University of Wisconsin, Milwaukee Peter Johnson (chair), Brookhaven National Laboratory Apurva Mehta, SLAC

  18. Proposal Study Panels

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Study Panels Print Two Proposal Study Panels (PSPs) exist at the ALS: one for the general sciences and one for structural biology. The role of the PSPs is desribed in User Policy. Note: Users are urged NOT to contact any members of the panels directly. Current members of the general sciences PSP, as of April 2016, are Masa Fukuto, Brookhaven National Laboratory Carol Hirschmugl, University of Wisconsin, Milwaukee Peter Johnson (chair), Brookhaven National Laboratory Apurva Mehta, SLAC

  19. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-11-01

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. The Emergency Management System provides the framework for development, coordination, control, and direction of all emergency planning, preparedness, readiness assurance, response, and recovery actions. Canceled by DOE O 151.1B. Cancels DOE O 151.1.

  20. Oil and gas leasing in proposed wilderness areas: the Wyoming District Court's interpretation of Section 603 of the Federal Land Policy Management Act of 1976 - Rocky Mountain Oil and Gas Association v. Andrus, 500 F. Supp. 1338 (D. Wyo. 1980), appeal docketed, No. 81-1040 (10th Cir. Jan. 5, 1981)

    SciTech Connect (OSTI)

    Corbett, H.E.

    1982-01-01

    Plaintiff Rocky Mountain Oil and Gas Association, a non-profit trade association, brought suit against the Secretary of the Interior, challenging land management policies of the Department of the Interior which plaintiff contended have effectively prohibited oil and gas exploration in areas proposed as wilderness under the Federal Land Policy Management Act of 1976 (FLPMA). The principal issue at trial was Interior's interpretation of the wilderness study provisions contained in Section 603 of the Act, which directed that activities on oil and gas leases in proposed wilderness areas be managed so as to prevent impairment of wilderness values. The United States Court for the District of Wyoming, Kerr, J., held that strict application of the non-impairment standard of Section 603, FLPMA, by the Department of the Interior virtually halted oil and gas exploration in proposed wilderness areas, and is therefore statutorily erroneous, clearly contrary to Congressional intent, and counter-productive to public interest. The Trial Court's decision is being appealed to the Tenth Circuit Court of Appeals under the title Rocky Mountain Oil and Gas Association v. Watt. 91 references.

  1. EA-1628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa

    Broader source: Energy.gov [DOE]

    This EA evaluated the potential environmental impacts of a DOE proposal to provide financial assistance (the Proposed Action) to POET Project LIBERTY, LLC (POET) for the construction and operation...

  2. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.

  3. EIS-0472: Mitigation Action Plan

    Broader source: Energy.gov [DOE]

    Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

  4. Appendix VI Corrective Action Strategy

    National Nuclear Security Administration (NNSA)

    ......... 15 3.0 Underground Test Area............ 13 3-1 Underground Test Area Corrective Action ...

  5. Unsolicited Proposals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unsolicited Proposals Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory ...

  6. President's 2017 Budget Proposal for DOE Supports Energy Innovation,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Security, Nuclear Management Responsibilities | Department of Energy 7 Budget Proposal for DOE Supports Energy Innovation, National Security, Nuclear Management Responsibilities President's 2017 Budget Proposal for DOE Supports Energy Innovation, National Security, Nuclear Management Responsibilities February 9, 2016 - 2:30pm Addthis Secretary Moniz briefs the media about the Energy Department's 2017 Budget Request to Congress. | Energy Department video News Media Contact

  7. Proposed Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2013-06-28

    Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

  8. Proposed Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

  9. Enterprise Assessments Emergency Management Assessment of the...

    Office of Environmental Management (EM)

    ... EAL Emergency Action Level ED Emergency Director ... Emergency Management Assessment of the Waste Isolation Pilot Plant ... assessment checklist, and the emergency ...

  10. West Valley Demonstration Project Transportation Emergency Management...

    Office of Environmental Management (EM)

    ... protective action criteria, declare accurate ... Low-level Waste Being Shipped Off Site 4 1.0 Introduction The ... Office of Emergency Management Oversight, within the ...

  11. DOE - Office of Legacy Management -- Monticello

    Office of Legacy Management (LM)

    The sites transferred to the Office of Legacy Management in 2003 and require operation and maintenance of remedial action systems, routine inspection and maintenance, ...

  12. DOE - Office of Legacy Management -- Pinellas

    Office of Legacy Management (LM)

    The site transferred to the Office of Legacy Management in 2004 and requires operation and maintenance of remedial action systems, routine inspection and maintenance, ...

  13. DOE - Office of Legacy Management -- Fernald

    Office of Legacy Management (LM)

    The site transferred to the Office of Legacy Management in 2006 and requires operation and maintenance of remedial action systems, environmental monitoring, routine inspection and ...

  14. DOE methods for evaluating environmental and waste management samples.

    SciTech Connect (OSTI)

    Goheen, S C; McCulloch, M; Thomas, B L; Riley, R G; Sklarew, D S; Mong, G M; Fadeff, S K

    1994-04-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) provides applicable methods in use by. the US Department of Energy (DOE) laboratories for sampling and analyzing constituents of waste and environmental samples. The development of DOE Methods is supported by the Laboratory Management Division (LMD) of the DOE. This document contains chapters and methods that are proposed for use in evaluating components of DOE environmental and waste management samples. DOE Methods is a resource intended to support sampling and analytical activities that will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the US Environmental Protection Agency (EPA), or others.

  15. Adaptive management: a paradigm for remediation of public facilities

    SciTech Connect (OSTI)

    Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B

    2009-01-01

    Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.

  16. Remedial Action Performed

    Office of Legacy Management (LM)

    ... for current or likely land use, as proposed in 10 CFR ... with applicable requirements pending evaluation of ... petroleum and natural gas products that preexist in ...

  17. Environmental Management Waste Management Facility (EMWMF) at Oak Ridge |

    Energy Savers [EERE]

    Department of Energy Waste Management Facility (EMWMF) at Oak Ridge Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Full Document and Summary Versions are available for download PDF icon Environmental Management Waste Management Facility (EMWMF) at Oak Ridge PDF icon Summary - Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN More Documents & Publications Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion

  18. Original Workshop Proposal and Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notes for Vis Requirements Original Workshop Proposal and Description Original Workshop Proposal and Description Visualization Requirements for Computational Science and ...

  19. Environmental Assessment for the proposed modification and continued operation of the DIII-D facility

    SciTech Connect (OSTI)

    NONE

    1995-07-01

    The EA evaluates the proposed action of modifying the DIII-D fusion facility and conducting related research activities at the GA San Diego site over 1995-1999 under DOE contract number DE-ACO3-89ER51114. The proposed action is need to advance magnetic fusion research for future generation fusion devices such as ITER and TPX. It was determined that the proposed action is not a major action significantly affecting the quality of the human environment according to NEPA; therefore a finding of no significant impact is made and an environmental impact statement is not required.

  20. Proposed Rules IV. Conclusion

    Energy Savers [EERE]

    686 Federal Register / Vol. 81, No. 44 / Monday, March 7, 2016 / Proposed Rules IV. Conclusion For the reasons cited in this document, the NRC is denying PRM- 50-106. The NRC is denying this petition because the current regulations already address environmental qualification in both mild and design basis event conditions of electrical equipment located both inside and outside of the containment building that is important to safety, and the petitioners did not provide significant new or

  1. Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2012-07-17

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 547 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 547 consists of the following three Corrective Action Sites (CASs), located in Areas 2, 3, and 9 of the Nevada National Security Site: (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; AND (3) CAS 09-99-06, Gas Sampling Assembly Closure activities began in August 2011 and were completed in June 2012. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 547 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The recommended corrective action for the three CASs in CAU 547 was closure in place with administrative controls. The following closure activities were performed: (1) Open holes were filled with concrete; (2) Steel casings were placed over vertical expansion joints and filled with cement; (3) Engineered soil covers were constructed over piping and exposed sections of the gas sampling system components; (4) Fencing, monuments, Jersey barriers, radiological postings, and use restriction (UR) warning signs were installed around the perimeters of the sites; (5) Housekeeping debris was picked up from around the sites and disposed; and (6) Radiological surveys were performed to confirm final radiological postings. UR documentation is included in Appendix D. The post-closure plan was presented in detail in the CADD/CAP for CAU 547 and is included as Appendix F of this report. The requirements are summarized in Section 5.2 of this report. The proposed post-closure requirements consist of visual inspections to determine the condition of postings and radiological surveys to verify contamination has not migrated. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 547; and (2) The transfer of CAU 547 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.

  2. West Valley Demonstration Project Waste Management Environmental Impact Statement Supplement Analysis (DOE/EIS-0337-SA-01) (06/07/06)

    Office of Environmental Management (EM)

    3 7-SA-O1 West Valley Demonstration Project Waste Management Environmental Impact Statement Supplement Analysis Revised Final U.S. Department of Energy West Valley Demonstration Project West Valley, New York June 7, 2006 WVDP Waste Management US - Supplement Analysis Table of Contents 1.0 PURPOSE AND NEED FOR AGENCY ACTION 1 2.0 PROPOSED ACTIONS 1 3.0 WASTE TYPE DEFINITIONS 2 4.0 EXISTING NEPA ANALYSIS 3 5.0 NEW INFORMATION 3 6.0 IS A SUPPLEMENTAL EIS NEEDED~ 5 6.1 Glass Melter, CFMT, and MFHT 5

  3. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  4. Interim Action Determination

    Energy Savers [EERE]

    Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national security needs of the United States. Although the Deputy Secretary of Energy approved Critical

  5. February 2007 Standards Actions

    Energy Savers [EERE]

    DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 01-26-2007 Activity

  6. April 2008 Standards Actions

    Energy Savers [EERE]

    Apps for Vehicles Challenge Finalists Announced Apps for Vehicles Challenge Finalists Announced February 5, 2013 - 12:14pm Addthis Apps for Vehicles Finalists Apps for Vehicles Finalists Ian Kalin Director of the Energy Data Initiative What does this project do? The Apps for Vehicles competition challenges entrepreneurs to use vehicle open data to make cars and drivers safer and more efficient. American innovators have once again responded to a national call to action. Nearly 40 teams submitted

  7. August 2006 Standards Actions

    Energy Savers [EERE]

    DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In

  8. Safety Management Functions, Responsibilities, and Authorities Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-31

    This Manual defines safety management functions, responsibilities, and authorities for DOE senior management with responsibilities for line, support, oversight, and enforcement actions. Cancels DOE M 411.1-1B. Canceled by DOE O 450.2.

  9. Safety Management Functions, Responsibilities, and Authorities Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-10-08

    This Manual defines safety management functions, responsibilities, and authorities for DOE senior management with responsibilities for line, support, oversight, and enforcement actions. Canceled by DOE M 411.1-1A. Does not cancel other directives.

  10. Environmental assessment for the Radioactive and Mixed Waste Management Facility: Sandia National Laboratories/New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0466) under the National Environmental Policy Act (NEPA) of 1969 for the proposed completion of construction and subsequent operation of a central Radioactive and Mixed Waste Management Facility (RMWMF), in the southeastern portion of Technical Area III at Sandia National Laboratory, Albuquerque (SNLA). The RMWMF is designed to receive, store, characterize, conduct limited bench-scale treatment of, repackage, and certify low-level waste (LLW) and mixed waste (MW) (as necessary) for shipment to an offsite disposal or treatment facility. The RMWMF was partially constructed in 1989. Due to changing regulatory requirements, planned facility upgrades would be undertaken as part of the proposed action. These upgrades would include paving of road surfaces and work areas, installation of pumping equipment and lines for surface impoundment, and design and construction of air locks and truck decontamination and water treatment systems. The proposed action also includes an adjacent corrosive and reactive metals storage area, and associated roads and paving. LLW and MW generated at SNLA would be transported from the technical areas to the RMWMF in containers approved by the Department of Transportation. The RMWMF would not handle nonradioactive hazardous waste. Based on the analysis in the EA, the proposed completion of construction and operation of the RMWMF does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, preparation of an environmental impact statement for the proposed action is not required.

  11. Conditional data watchpoint management

    DOE Patents [OSTI]

    Burdick, Dean Joseph; Vaidyanathan, Basu

    2010-08-24

    A method, system and computer program product for managing a conditional data watchpoint in a set of instructions being traced is shown in accordance with illustrative embodiments. In one particular embodiment, the method comprises initializing a conditional data watchpoint and determining the watchpoint has been encountered. Upon that determination, examining a current instruction context associated with the encountered watchpoint prior to completion of the current instruction execution, further determining a first action responsive to a positive context examination; otherwise, determining a second action.

  12. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect (OSTI)

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  13. Proposed solar two project Barstow, California

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This Environmental Assessment (EA) evaluates the environmental consequences of the proposed conversion and operation of the existing Solar One Facility in Daggett, Ca, near the city of Barstow, to a nitrate salt based heat transfer system, Solar Two. The EA also addresses the alternatives of different solar conversion technologies and alternative sites and discusses a no action alternative. A primary objective of the Solar Two Project is to demonstrate the technical and economic feasibility of a solar central receiver power plant using molten salt as the thermal storage and transport fluid medium. If successful, the information gathered from the Solar Two Project could be used to design larger commercial solar power plants.

  14. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register / Vol. 80, No. 215 / Friday, November 6, 2015 / Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas Corn Producers Board requesting an experimental use permit (EUP) for the Aspergillus flavus strains TC16F, TC35C, TC38B, and TC46G. The Agency has determined that the permit may be of regional and national significance. Therefore, because of the potential significance, EPA is seeking comments on this application. DATES:

  15. Energy Literacy in Action: Nevada Teachers Helping Students Learn About

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy | Department of Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy November 6, 2014 - 10:48am Addthis Nevada schoolchildren's energy literacy activities. | Photo Courtesy of Monica Brett. Nevada schoolchildren's energy literacy activities. | Photo Courtesy of Monica Brett. Erin Twamley Project and Web Manager, Education & Workforce Development What are the key facts? Download

  16. ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PLAN CLOSURE REPORT | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PLAN CLOSURE REPORT ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PLAN CLOSURE REPORT The Department conducted a root cause analysis (RCA) workshop on October 16-17, 2007, to identify the systemic challenges of planning and managing DOE projects. During the workshop participants singled out 143 issues, which they consolidated and prioritized. The Department published the results of the RCA workshop in an April 2008 DOE report entitled, U.S.

  17. Secretary Chu's Diversity Action Letter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Secretary Chu's Diversity Action Letter Secretary Chu's Diversity Action Letter In July 2011, the Office of Diversity Programs concluded a comprehensive review of DOE's workforce diversity and inclusion policies and programs. The findings from this analysis, which have been shared with DOE senior management, indicate that we can do more to create a culture that values diversity, which in turn will make the Department an employer of choice and enhance our mission effectiveness. Read more about

  18. RCRA corrective action and closure

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators` interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE`s permitted facilities and interim status facilities.

  19. Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico

    SciTech Connect (OSTI)

    N /A

    2003-11-03

    The National Environmental Policy Act of 1969 (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA), follows the Council on Environmental Quality regulations (40 CFR 1500-1508) and DOE's NEPA implementing procedures (10 CFR 1021). The purpose of an environmental assessment (EA) is to provide Federal decision makers with sufficient evidence and analysis to determine whether to prepare an environmental impact statement (EIS) or issue a Finding of No Significant Impact. Los Alamos National Laboratory (LANL) is a national security laboratory located at Los Alamos, New Mexico, that comprises about 40 square miles (mi{sup 2}) (103.6 square kilometers [km{sup 2}]) of buildings, structures, and forested land (Figure 1). It is administered by NNSA for the Federal government and is managed and operated under contract by the University of California (UC). The NNSA must make a decision whether to consolidate and construct new facilities for the Dynamic Experimentation Division (DX) to create a central core area of facilities, including offices, laboratories, and other support structures, at LANL's Two-Mile Mesa Complex, which comprises portions of Technical Area (TA) 6, TA-22, and TA-40. This Proposed Action would involve constructing new buildings; consolidating existing operations and offices; enhancing utilities, roads, and security infrastructure; and demolishing or removing older buildings, structures, and transportables at various technical areas used by DX (Figure 2). This EA has been prepared to assess the potential environmental consequences of this proposed construction, operational consolidation, and demolition project. The objectives of this EA are to (1) describe the underlying purpose and need for NNSA action; (2) describe the Proposed Action and identify and describe any reasonable alternatives that satisfy the purpose and need for agency action; (3) describe baseline environmental conditions at LANL; (4) analyze the potential indirect, direct, and cumulative effects to the existing environment from implementation of the Proposed Action, and (5) compare the effects of the Proposed Action with the No Action Alternative and other reasonable alternatives. For the purposes of compliance with NEPA, reasonable alternatives are identified as being those that meet NNSA's purpose and need for action by virtue of timeliness, appropriate technology, and applicability to LANL. The EA process provides NNSA with environmental information that can be used in developing mitigative actions, if necessary, to minimize or avoid adverse effects to the quality of the human environment and natural ecosystems should NNSA decide to proceed with implementing the Proposed Action at LANL. Ultimately, the goal of NEPA, and this EA, is to aid NNSA officials in making decisions based on an understanding of environmental consequences and in taking actions that protect, restore, and enhance the environment.

  20. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect (OSTI)

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  1. EERE Program Management Initiative (PMI) Brochure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiative (PMI) Brochure EERE Program Management Initiative (PMI) Brochure The EERE Program Management Initiative document outlines a coordinated set of actions to improve its program management capabilities. PDF icon pmi_brochure.pdf More Documents & Publications EERE Program Management Guide - About the Program Management Guide EERE Program Management Guide - Appendix I

  2. Proposal Types | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from anywhere in the world to use the APS through a competitive access process. CAT Member and Staff Proposals Proposals from members and staff of Collaborative Access...

  3. Sodium dichromate expedited response action assessment

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) perform an expedited response action (ERA) for the Sodium Dichromate Barrel Disposal Landfill. The ERA lead regulatory agency is Ecology and EPA is the support agency. The ERA was categorized as non-time-critical, which required preparation of an engineering evaluation and cost analysis (EE/CA). The EE/CA was included in the ERA proposal. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the Sodium Dichromate Barrel Disposal Landfill is the only waste site within the operable unit, the removal action may be the final remediation of the 100-IU-4 Operable Unit. This ERA process started in March 1992. The ERA proposal went through a parallel review process with Westinghouse Hanford Company (WHC), DOE Richland Operations (RL), EPA, Ecology, and a 30-day public comment period. Ecology and EPA issued an Action Agreement Memorandum in March 1993 (Appendix A). The memorandum directed excavation of all anomalies and disposal of the collected materials at the Hanford Site Central Landfill. Primary field activities were completed by the end of April 1993. Final waste disposal of a minor quantity of hazardous waste was completed in July 1993.

  4. Proposed Remedial Action Plan: Proposed Plan for Remedial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site. DOE/OR/21548-724

    Office of Legacy Management (LM)

  5. Safety Walkthrough Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Walkthrough Management

  6. Enforcement actions: Significant actions resolved reactor licensees. Quarterly progress report, October--December 1994, Volume 13, No. 4, Part 1

    SciTech Connect (OSTI)

    1995-02-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1994) and includes copies of letters Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  7. Enforcement actions: Significant actions resolved medical licensees. Quarterly progress report, January 1995--March 1995. Volume 14, No. 1, Part 2

    SciTech Connect (OSTI)

    1995-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January-March 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to medical licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  8. Enforcement actions: Significant actions resolved, reactor licensees. Semiannual progress report, January--June 1997; Volume 16, Number 1, Part 2

    SciTech Connect (OSTI)

    1997-09-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (January--June 1997) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  9. Hawaii Application for Surface Water Use Permit for Proposed...

    Open Energy Info (EERE)

    for Proposed New Use in a Designated Surface Water Management Area (DLNR Form SWUPA-N) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Hawaii...

  10. Environmental impacts of proposed Monitored Retrievable Storage. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  11. Issues Management Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    IMTool performs the following: • The IMTool can manage issues, actions, and activities from one screen. • Provides enhanced and intuitive searching, sorting, and filtering capabilities. Grids allow for filtering any column instantly by any data heading. • IMTool uses drop-down menus to ensure date is entered accurately with consistency. • User-friendly system – highly utilized commitment tracking screen functions. Information is viewed on the left side of the screen and managed on the right.

  12. Climate Action Tracker | Open Energy Information

    Open Energy Info (EERE)

    References: Climate Action Tracker1 "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The...

  13. Emergencies and Emergency Actions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of...

  14. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  15. EA-1595: Mitigation Action Plan | Department of Energy

    Energy Savers [EERE]

    Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor approximately 61 miles of 230-kV transmission line from the Davis Substation at Davis Dam near Bullhead City, Arizona, to the Mead Substation near Boulder City in southern Nevada. PDF icon Mitigation Action Plan for the Davis-Mead 230-kV Transmission Line Reconductor Project, DOE/EA-1595 (November 2007) More Documents &

  16. Environmental Management

    SciTech Connect (OSTI)

    2014-11-12

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  17. Environmental Management

    ScienceCinema (OSTI)

    None

    2015-01-07

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  18. Evaluation Criteria for PDIL Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Criteria for PDIL Proposal The selection/decision criteria used by the NCPV Business Development Team are the following: 1. Quality and Relevance of the Proposed Technical Plan (30%) * Technology impact with industry and likelihood of success. Demonstrated benefits of success to both the proposer and NREL to meet the DOE SunShot goals. * Proposed task descriptions and time line. Clear demonstration of entrance and exit strategies in the PDIL. * Extent to which the Proposer and NREL can rapidly

  19. Interim Action Determination

    Energy Savers [EERE]

    Smith Dawson & Andrews Interested Parties - Smith Dawson & Andrews PDF icon 09-03-10_Smith_Dawson_Andrews.pdf More Documents & Publications Interested Parties - ARPA-E / National Association of Manufacturers Interested Parties - Chrystler Interested Parties - Myriant

    WAPA Public Comment Interested Parties - WAPA Public Comment Comments Received in Response to Western Area Power Administration's Federal Register Notice Titled 'Notice of Proposed Program and Request for Public

  20. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  1. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  2. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determination (Energy Conservation Standard) for Set-Top Boxes | Department of Energy Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes December 23, 2013 - 12:00am Addthis The Department of Energy (DOE) has issued pre-publication Federal Register notices withdrawing the notice

  3. Review Policy / Proposal Guidelines / Reporting Requirements| U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Science (SC) Review Policy / Proposal Guidelines / Reporting Requirements High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts HEP Early Career Opportunities Review Policy / Proposal Guidelines / Reporting Requirements Additional Requirements and Guidance for Digital Data Management Acknowledgements of Federal

  4. International Program Action Table - October 2012 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communication & Engagement International Programs International Program Action Table - October 2012 International Program Action Table - October 2012 International Program ...

  5. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  6. Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template Template for briefing Baseline Change Proposals to the ESAAB and/or PMRC July 2015 Office presentation icon Template Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications DOE Project Management Risk Committee (PMRC) SOP Critical Decision 2 (CD-2) ESAAB and PMRC Brief Template External

  7. LANSCE | Lujan Center | Tips for Writing Beamtime Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Aaron Couture (acting) 505.667.1730 Deputy Leader Fredrik Tovesson 505.665.9652 Deputy Leader & Experimental Area Manager Charles Kelsey 505.665.5579 Experiment Coordinator Charles Kelsey (acting) 505.667.8755 User Program Administration lujan-uo@lanl.gov Administrative Assistant Julie Quintana-Valdez 505.665.5390 Department of Energy, National Nuclear Security Administration nnsa.energy.gov Tips for Writing Beamtime Proposals LANSCE User Resources Tips for a Successful Proposal Proposals

  8. Department of Energy Issues Draft Request for Proposals for Argonne

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratory Contractor | Department of Energy Request for Proposals for Argonne National Laboratory Contractor Department of Energy Issues Draft Request for Proposals for Argonne National Laboratory Contractor January 3, 2006 - 9:06am Addthis WASHINGTON, DC -- The Department of Energy (DOE) is seeking comments on a draft Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor for Argonne National Laboratory (ANL), a major DOE

  9. Closure Report for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    T. M. Fitzmaurice

    2001-12-01

    This closure report (CR) provides documentation for the closure of the Roller Coaster RADSAFE Area (RCRSA) Corrective Action Unit (CAU) 407 identified in the Federal Facility Agreement and Consent Order (FFACO) (Nevada Division of Environmental Protection [NDEP] et al., 1996). CAU 407 is located at the Tonopah Test Range (TTR), Nevada. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The RCRSA is located on the northeast comer of the intersection of Main Road and Browne's Lake Road, which is approximately 8 km (5 mi) south of Area 3 (Figure 1). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Double Tracks and Clean Slate tests. Investigation of the RCRSA was conducted from June through November of 1998. A Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOEN], 1999) was approved in October of 1999. The purpose of this CR is to: Document the closure activities as proposed in the Corrective Action Plan (CAP) (DOEM, 2000). Obtain a Notice of Completion from the NDEP. Recommend the movement of CAU 407 from Appendix III to Appendix IV of the FFACO. The following is the scope of the closure actions implemented for CAU 407: Removal and disposal of surface soils which were over three times background for the area. Soils identified for removal were disposed of at the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS). Excavated areas were backfilled with clean borrow soil located near the site. A soil cover was constructed over the waste disposal pit area, where subsurface constituents of concern remain. The site was fenced and posted as an ''Underground Radioactive Material'' area.

  10. LAMPF: proposal status and summaries

    SciTech Connect (OSTI)

    Rayburn, L.; Talley, B.

    1982-03-01

    Revisions and additions are given for LAMPF proposal summaries and status reports. These apply to LA-7444-MS. (GHT)

  11. FY 2016-2018 Action Agenda Framework Webinar

    Broader source: Energy.gov [DOE]

    Learn about the EJ IWG’s Draft Action Agenda Framework. The Framework advances greater Federal agency collaboration to support holistic community-based solutions to address environmental justice issues in environmental protection, housing, transportation, economic development, energy policy, natural and cultural resources management and health disparities.

  12. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    REMEDIAL ACTION PROGRAM ELIMINATION REPORT SONABOND ULTRASONICS FORMERLY AEROPROJECTS, INC. 200-T E. ROSEDALE AVENUE WEST CHESTER,~PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration and Waste Management Office of Environmental Restoration Office of Eastern Area Programs . . . CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . Site Function Site Description Radiological History and

  13. FORMERLY UTILIZED SITES REUEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    REUEDIAL ACTION PROGRAM ELIMINATION REPORT COPPERWELD STEEL COMPANY 4000 MAHONING AVENUE, N.W. WARREN. OHIO December 1991 U.S. Department of Energy Office of Environmental Restoration and Waste Management Office of Environmental Restoration Office of Eastern Area Programs CONTENTS INTRODUCTION . . . . . . . . . . . &gg . . . . . . . . . . . . . . .l BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . .l Site Function Site Description Radiological History and Status ELIMINATION

  14. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Alfred Wickline

    2009-04-01

    Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: Move surface debris and/or materials, as needed, to facilitate sampling. Conduct radiological surveys. Perform field screening. Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. Collect samples of source material to determine the potential for a release. Collect samples of potential remediation wastes. Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  15. Unsolicited Proposals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unsolicited Proposals Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas. http://www.netl.doe.gov/business/usp/unsol.html

  16. ESPC ENABLE Final Proposal Requirements

    Broader source: Energy.gov [DOE]

    Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency’s Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal.

  17. Remedial design/remedial action strategy report

    SciTech Connect (OSTI)

    Dieffenbacher, R.G.

    1994-06-30

    This draft Regulatory Compliance Strategy (RCS) report will aid the ER program in developing and implementing Remedial Design/Remedial Action (RD/RA) projects. The intent of the RCS is to provide guidance for the implementation of project management requirements and to allow the implementation of a flexible, graded approach to design requirements depending on the complexity, magnitude, schedule, risk, and cost for any project. The RCS provides a functional management-level guidance document for the identification, classification, and implementation of the managerial and regulatory aspects of an ER project. The RCS has been written from the perspective of the ER Design Manager and provides guidance for the overall management of design processes and elements. The RCS does not address the project engineering or specification level of detail. Topics such as project initiation, funding, or construction are presented only in the context in which these items are important as sources of information or necessary process elements that relate to the design project phases.

  18. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    SciTech Connect (OSTI)

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

  19. Transition of Sites from Environmental Management Memorandum of

    Energy Savers [EERE]

    Understanding | Department of Energy Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from Environmental Management Memorandum of Understanding PDF icon Transition of Sites from Environmental Management Memorandum of Understanding More Documents & Publications Site Transition Guidance Transition of Long-Term Response Action Management Requirements Development of

  20. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Host Laboratory for U.S. participation in the Large Hadron Collider (LHC) Compact Muon Solenoid detector, construction of certain LHC accelerator components, and the U.S. LHC...

  1. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... In addition, an information library regarding the solicitation is available on the DOE Office of Science web site at http:rfpanl.sc.doe.gov. Media contact(s): Craig Stevens, ...

  2. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... In addition, an information library regarding the solicitation is available on the DOE Office of Science web site at http:rfpfnal.sc.doe.gov. Media contact(s): Jeff Sherwood, ...

  3. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... In addition, an information library regarding the solicitation is available on the DOE Office of Science Web site. The RFP is being issued in final form. Comments on the RFP, ...

  4. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... In addition, an information library regarding the solicitation is available on the DOE Office of Science Web site at http:rfpames.sc.doe.gov. The RFP is being issued in final ...

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Matthews, Patrick

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  6. 2012 Uranium Survey Form Proposals

    Gasoline and Diesel Fuel Update (EIA)

    Information and Regulatory Affairs, Office of Management and Budget, New Executive Office Building, Room 10102, 735 17th Street, NW, Washington, DC 20503, and to Douglas Bonnar,...

  7. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  8. Checklist for Managing a General Program Evaluation Study

    Broader source: Energy.gov [DOE]

    This checklist for managing a general program evaluation study provides action items covering the following topics: initial planning; evaluation design and procurement; implementation of study;...

  9. DOE - Office of Legacy Management -- Riverton Mill Site - WY...

    Office of Legacy Management (LM)

    Control Act (UMTRCA) Title I Site April Gil, PhD Environment Team Lead Office of Legacy Management (LM) May 2, 20122 Status and Action Summary Surface Remediation ...

  10. DOE - Office of Legacy Management -- Canonsburg Industrial Park...

    Office of Legacy Management (LM)

    2008 Groundwater and Surface Water Sampling FACT SHEET Office of Legacy Management Canonsburg, Pennsylvania, Disposal Site Project Plan: Ground Water Compliance Action Plan (GCAP). ...

  11. Nuclear waste management. Semiannual progress report, April 1983-September 1983

    SciTech Connect (OSTI)

    McElroy, J.L.; Powell, J.A. (comps.)

    1984-01-01

    The status of the following programs is reported: waste stabilization; waste isolation; low-level waste management; remedial action; and supporting studies. 58 figures, 39 tables.

  12. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1996--June 1996

    SciTech Connect (OSTI)

    1996-08-01

    This document summarizes significant enforcement actions that have been resolved during the period of January-June 1996. The report includes copies of Orders and Notices of Violations sent by the Nuclear Regulatory Commission to individuals with respect to the enforcement actions.

  13. Webinar for Tribes, States, Local Governments, and Territories on the Clean Power Plan Supplemental Proposal

    Broader source: Energy.gov [DOE]

    On Tuesday, October 28, 2014, EPA issued an action related to the proposed Clean Power Plan to cut carbon pollution from power plants. EPA is following through on its commitment made in June to...

  14. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  15. Proposed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford's tank waste in a glass formation. Tank farm - A grouping of underground storage tanks. The 177 tanks are in 17 different groups, or farms. The largest tank farm has...

  16. Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    More MiniBooNE Antineutrino Data Taking The MiniBooNE Collaboration (Dated: February 4, 2009) 1 EXECUTIVE SUMMARY The MiniBooNE experiment at Fermilab was designed to test the LSND evidence for neutrino oscillations [1]. The updated MiniBooNE oscillation result in neutrino mode [2] with 6.5E20 protons on target (POT) shows no significant excess of events at higher energies (E ν > 475 MeV), although a sizeable excess (128.8 ± 20.4 ± 38.3 events) is observed at lower energies (E ν < 475

  17. The U.S. Department of Energy Formerly Utilized Sites Remedial Action

    Energy Savers [EERE]

    Program: Ensuring Protectiveness and Preserving Knowledge | Department of Energy The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge (Waste Management Conference

  18. Environmental assessment of remedial action at the slick rock Uranium Mill Tailings sites Slick Rock, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section} 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use.

  19. Price/Cost Proposal Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Proposal shall be completed and signed by an authorized official for your organization. ... welding, minor fabrication, etc.), raw materials, standard commercial items, ...

  20. ARM - Submitting Proposals : Guideline Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Principal Investigators Forms Propose a Campaign Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps for Submitting Field Campaign Data and Metadata...

  1. Final Environmental assessment for the Uranium Lease Management Program

    SciTech Connect (OSTI)

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  2. Project Hanford management contract quality improvement project management plan

    SciTech Connect (OSTI)

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  3. Method for triggering an action

    DOE Patents [OSTI]

    Hall, David R.; Bartholomew, David B.; Johnson, Monte L.; Moon, Justin; Koehler, Roger O.

    2006-10-17

    A method for triggering an action of at least one downhole device on a downhole network integrated into a downhole tool string synchronized to an event comprises determining latency, sending a latency adjusted signal, and performing the action. The latency is determined between a control device and the at least one downhole device. The latency adjusted signal for triggering an action is sent to the downhole device. The action is performed downhole synchronized to the event. A preferred method for determining latency comprises the steps: a control device sends a first signal to the downhole device; after receiving the signal, the downhole device sends a response signal to the control device; and the control device analyzes the time from sending the signal to receiving the response signal.

  4. ICDF Complex Remedial Action Report

    SciTech Connect (OSTI)

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  5. Complexity, action, and black holes

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Brown, Adam R.; Roberts, Daniel A.; Susskind, Leonard; Swingle, Brian; Zhao, Ying

    2016-04-18

    In an earlier paper "Complexity Equals Action" we conjectured that the quantum computational complexity of a holographic state is given by the classical action of a region in the bulk (the `Wheeler-DeWitt' patch). We provide calculations for the results quoted in that paper, explain how it fits into a broader (tensor) network of ideas, and elaborate on the hypothesis that black holes are the fastest computers in nature.

  6. DOE - Office of Legacy Management -- Beverly MA Site - MA 04

    Office of Legacy Management (LM)

    This site is managed by the U.S. Department of Energy Office of Legacy Management. MA.04-1 - DOE Memorandum; Voigt to LaGrone; Subject: Designation of Sites for Remedial Action - ...

  7. Proposal Submission | Linac Coherent Light Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LCLS PROPOSALS & PROPOSAL REVIEW PROCESS ( PROPOSAL REVIEW PANEL) Please note the ... the same team members may not be reviewed favorably by the Proposal Review Panel (PRP). ...

  8. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    SciTech Connect (OSTI)

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action alternatives.

  9. Group key management

    SciTech Connect (OSTI)

    Dunigan, T.; Cao, C.

    1997-08-01

    This report describes an architecture and implementation for doing group key management over a data communications network. The architecture describes a protocol for establishing a shared encryption key among an authenticated and authorized collection of network entities. Group access requires one or more authorization certificates. The implementation includes a simple public key and certificate infrastructure. Multicast is used for some of the key management messages. An application programming interface multiplexes key management and user application messages. An implementation using the new IP security protocols is postulated. The architecture is compared with other group key management proposals, and the performance and the limitations of the implementation are described.

  10. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    SciTech Connect (OSTI)

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project.

  11. Best-in-Class Project Management Initiative Corporate Implementation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inc. BICPM "Best-in-Class" Project and Contract Management BCP Baseline Change Proposal CBC Consolidated ... EVMS Earned Value Management System F Field FPD Federal Project ...

  12. Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites

    Broader source: Energy.gov [DOE]

    Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites (Waste Management...

  13. Earned Value Management System (EVMS) Corrective Action Standard...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Most organizations have employees who are specialized in root cause analysis, such as Six Sigma, Lean process improvement, and ISO (International Organization of Standards) 9000 ...

  14. NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION

    Office of Environmental Management (EM)

    COSTS Previous 1,656 3,312 621,000 New 1,656 13,248 1,035,000 Difference Change due to New Statute 0 0 0 Change due to Agency Discretion 0 0 0 Change due to Agency Adjustment 0...

  15. UMTRA Ground Water Project management action process document

    SciTech Connect (OSTI)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  16. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  17. NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2262010 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: Tom Pyke FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act,...

  18. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  19. Climate Action Champions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiatives » Climate Action Champions Climate Action Champions Climate Action Champions The White House launched the Climate Action Champions (CAC) Initiative in December 2014 with the U.S. Department of Energy (DOE) as lead Agency and, expanded the initiative in December 2015 through a strategic partnership with the Corporation for National Community Service (CNCS). PROGRAM POLICY OBJECTIVES The Climate Action Champions Initiative supports local and tribal government climate actions by:

  20. Part 3: Removal Action | Department of Energy

    Office of Environmental Management (EM)

    3: Removal Action Part 3: Removal Action Question: When may removal actions be initiated? Answer: Removal actions may be initiated when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to health or the environment. The NCP specifies that the determination that a risk to health or the environment is appropriate for removal action should be based on: actual or potential exposure of humans, animals, or the food chain the presence of contained hazardous

  1. Letter: EPA has reviewed the DOE's proposals for the following four interim response actions

    Office of Legacy Management (LM)

  2. Proposal of Removal Action in the Southeast Drainage. SE-200-201-1.07.

    Office of Legacy Management (LM)

  3. Proposals For Four Interim Response Actions. IR-600-604-1.01.

    Office of Legacy Management (LM)

  4. Proposed Interim Response Action, Construction of Ash Pond Isolation System at the Weldon Spring Site.

    Office of Legacy Management (LM)

  5. Transcript of Proceedings: Quarry Waste Removal Proposed Plan Weldon Spring Site Remedial Action Projec

    Office of Legacy Management (LM)

  6. Description of Proposed Interim Remedial Action at the Weldon Spring Site.

    Office of Legacy Management (LM)

  7. DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND...

    Office of Environmental Management (EM)

    ... existing landfills and disposal facilities, the deed will limit the location of stormwater drainage facilities. meters) north of the centerline of Horn Rapids Road, and (b) ...

  8. Original Workshop Proposal and Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notes for Vis Requirements » Original Workshop Proposal and Description Original Workshop Proposal and Description Visualization Requirements for Computational Science and Engineering Applications Proposal for a DoE Workshop to Be Held 
at the Berkeley Marina Radisson Hotel,
Berkeley, California, June 5, 2002
(date and location are tenative) Workshop Co-organizers: Bernd Hamann 
University of California-Davis Lawrence Berkeley Nat'l Lab. E. Wes Bethel 
Lawrence Berkeley Nat'l Lab.

  9. EA-1704: Mitigation Action Plan

    Broader source: Energy.gov [DOE]

    Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi

  10. Climate Protection Action Fund | Open Energy Information

    Open Energy Info (EERE)

    Repower America Retrieved from "http:en.openei.orgwindex.php?titleClimateProtectionActionFund&oldid767417" Categories: Organizations Political Action Committees Policy...

  11. Inter Action Corp | Open Energy Information

    Open Energy Info (EERE)

    Action Corp Jump to: navigation, search Name: Inter Action Corp Place: Kanagawa, Japan Zip: 236-0004 Product: Semiconductor equipment and testing devices maker building a PV...

  12. Ecology Action: Small Market Advanced Retrofit Transformation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ecology Action: Small Market Advanced Retrofit Transformation Program (SMART) Lead Performer: Ecology Action - Santa Cruz, CA Partners: - New Buildings Institute - Portland, OR - ...

  13. Energy Agency Coordinators for Energy Action Month

    Broader source: Energy.gov [DOE]

    Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

  14. EAC Recommendations for DOE Action Regarding Interconnection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection-Wide Planning - June 6, 2013 EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 EAC Recommendations for DOE Action Regarding ...

  15. Climate Action Plan | OpenEI Community

    Open Energy Info (EERE)

    actions that the administration believes will mitigate the environmental and economic costs of climate change. Obama's six Climate Action Initiatives: 1. Phasing out Fossil Fuels...

  16. California Climate Action Registry | Open Energy Information

    Open Energy Info (EERE)

    Climate Action Registry Jump to: navigation, search Name: California Climate Action Registry Place: Los Angeles, California Zip: 90014 Product: Los Angeles-based NPO which develops...

  17. Renewable Energy Action Project | Open Energy Information

    Open Energy Info (EERE)

    Action Project Jump to: navigation, search Name: Renewable Energy Action Project Place: San Francisco, California Zip: 94107 Product: REAP is a San Francisco-based non-profit...

  18. Presidential Climate Action Project | Open Energy Information

    Open Energy Info (EERE)

    Page Edit with form History Presidential Climate Action Project Jump to: navigation, search Name: Presidential Climate Action Project Place: Denver, Colorado Zip: 80217-3364...

  19. Manager`s views of public involvement

    SciTech Connect (OSTI)

    Branch, K.M.; Heerwagen, J.; Bradbury, J.

    1995-12-01

    Four issues commonly form the framework for debates about the acceptability of proposed projects or technologies--the substantive decision or technological choice; the treatment of the community by the proponent organization; the way the decision-making process has been structured and managed; and the status of institutional safeguards and protection. One of the clear messages of cultural theory is that differences in perspectives are a normal and inevitable part of society, and that attempts to resolve differences by persuasion are not likely to work. These findings are useful when considering the goals and possibilities of public involvement as a decision-making tool, and when designing or evaluating public involvement training programs for managers. The research reported here examines the viewpoints and concerns of managers and decision-makers about the four issues identified above, with particular emphasis on their perspectives and concerns about opening decision-making processes to the public and about managers` roles and responsibilities for structuring and managing open decision-making processes. Implications of these findings for public involvement training for managers is also discussed. The data presented in this paper were obtained from face-to-face interviews with managers and decision-makers with experience managing a variety of hazardous waste management decision-making processes. We conducted these interviews in the course of four separate research projects: needs assessments to support the design and development of a public involvement training program for managers; a study of community residents` and managers` perspectives on the chemical stockpile disposal program; an evaluation of the effectiveness of public involvement training for managers in the Department of Energy; and a study to develop indicators of the benefits and costs of public involvement.

  20. High order Chin actions in path integral Monte Carlo

    SciTech Connect (OSTI)

    Sakkos, K.; Casulleras, J.; Boronat, J.

    2009-05-28

    High order actions proposed by Chin have been used for the first time in path integral Monte Carlo simulations. Contrary to the Takahashi-Imada action, which is accurate to the fourth order only for the trace, the Chin action is fully fourth order, with the additional advantage that the leading fourth-order error coefficients are finely tunable. By optimizing two free parameters entering in the new action, we show that the time step error dependence achieved is best fitted with a sixth order law. The computational effort per bead is increased but the total number of beads is greatly reduced and the efficiency improvement with respect to the primitive approximation is approximately a factor of 10. The Chin action is tested in a one-dimensional harmonic oscillator, a H{sub 2} drop, and bulk liquid {sup 4}He. In all cases a sixth-order law is obtained with values of the number of beads that compare well with the pair action approximation in the stringent test of superfluid {sup 4}He.

  1. Corrective Action Investigation Plan for Corrective Action Unit...

    Office of Legacy Management (LM)

    ... oil and hazardous substances on a national level. ... 1998a) govern the management of hazardous waste from generation to ... Sparse, low vegetation covers the area. The ground ...

  2. Corrective Action Decision Document/Corrective Action Plan for...

    Office of Legacy Management (LM)

    ... methods that describe the natural subsurface heterogeneity ... Department of the Interior, Bureau of Land Management (BLM). ... Drinking Water Act Requirements Although the FFACO ...

  3. Checklist for Managing a General Evaluation Study

    Broader source: Energy.gov [DOE]

    This checklist for managing a general program evaluation study provides action items covering the following topics: initial planning; evaluation design and procurement; implementation of study; and using evaluation results.

  4. SL/ST Performance Management Training

    Broader source: Energy.gov [DOE]

    The training provides an overview of DOE's SL/ST appraisal system, as well as describes key actions within all of the major phases of the annual performance management cycle. The guidance/training...

  5. Planning for an Energy Management System

    Broader source: Energy.gov [DOE]

    This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

  6. Management and Security of Personally Identifiable Information

    Broader source: Energy.gov [DOE]

    This Policy Flash transmits for your information and appropriate action the Deputy Secretary's Memorandum, Management and Security of Personally Identifiable Information, dated April 17, 2013. Further information will be transmitted as it becomes available.

  7. Monitoring and Managing Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jobs Monitoring and Managing Jobs Monitoring and Managing Batch Jobs These are some basic commands for monitoring and modifiying batch jobs while they're queued or running. NERSC has developed a new tool for monitoring and viewing the state of batch jobs for genepool called qs. Please read about Monitoring jobs with qs Action How to do it Comment Get a listing of your jobs and their states qs -u If you skip the -u option, you'll get all the jobs on Genepool/Phoebe. qstat -u user_name If you skip

  8. Monitoring and Managing Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monitoring and Managing Jobs Monitoring and Managing Jobs Commonly Used Commands Action How to do it Comment Get a summary of all batch jobs sgeusers Shows a tally of all jobs for all users including their states. This is a script that parses the output of qstat and is maintained by PDSF staff (located in /common/usg/bin). Do "sgeusers -h" for usage info. Get a listing of your jobs and their states qstat -u user_name If you skip the -u option, you'll get all the jobs on PDSF. Get

  9. The proposed Institute for Micro-manufacturing, Louisiana Tech University

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) DOE/EA-0958, evaluating the construction and equipping of two components of the proposed Institute for Micro-manufacturing at Louisiana Tech University (LTU), a proposed R and D facility to be located in Ruston, LA. and, the proposed installation of a beamline for micro-machining applications at the Center for Advanced Microstructures and Devices (CAMD) facility at Louisiana State University in Baton Rouge, LA. The objective of the proposed project is to focus on the applied, rather than basic research emphasizing the design and development, metrology, inspection and testing, and the assembly and production of micron and submicron structures and devices. Also, the objective of the beamline at CAMD would be the fundamental study of processing and analysis technologies, including x-ray lithography, which are important to microstructures fabrication and electronic device development. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required.

  10. Comparison of RCRA SWMU corrective action and CERCLA remedial action. Master's thesis

    SciTech Connect (OSTI)

    Rupe, S.C.

    1991-09-30

    With the passage of the Hazardous and Solid Waste Amendments of 1984 and the addition of expanded authorities to require corrective action for release of hazardous constituents from solid waste management units (SWMUs) at hazardous waste treatment, storage, and disposal facilities, the Solid Waste Disposal Act (hereafter referred to as the Resource Conservation and Recovery Act or RCRA) will dramatically influence the Superfund program under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Not only will the RCRA corrective action program help prevent current RCRA sites from becoming Superfund sites, but it also offers EPA and the states an important alternative to address superfund sites that already exist. EPA recognized this and, hoping to conserve Superfund resources, developed a policy to defer listing of sites from the National Priority List if those sites can be addressed under RCRA's corrective action authorities. Private industry and federal agencies with problem sites that could qualify under either program need to compare the advantages and disadvantages of each program. EPA's deferral policy continues to evolve and appears to be ripe for expansion.

  11. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    SciTech Connect (OSTI)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

  12. Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup |

    Energy Savers [EERE]

    Department of Energy Winning Entry Proposes Efficiencies to Tank Waste Cleanup Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup December 29, 2015 - 12:55pm Addthis From left, Elaine Diaz, Office of River Protection (ORP) acting chief engineer; John Vienna, Pacific Northwest National Laboratory scientist; Albert Kruger, ORP glass scientist; and Kevin Smith, ORP manager. From left, Elaine Diaz, Office of River Protection (ORP) acting chief engineer; John Vienna,

  13. ASCR Leadership Computing Challenge proposals due February 3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    proposals due February 3 ASCR Leadership Computing Challenge proposals due February 3 January 6, 2015 by Francesca Verdier The Call for 2015 ALCC is now open. See http://science.energy.gov/ascr/facilities/alcc/ for details. ALCC supports projects that advance the DOE mission and further the goals of DOE program offices. For 2015 ALCC, projects of special interest to the DOE include the following: Energy efficiency and the clean energy agenda Nuclear reactor safety and environmental management of

  14. Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)

    SciTech Connect (OSTI)

    1997-11-01

    This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy`s (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, {open_quotes}Corrective Action Strategy{close_quotes} (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles.

  15. Florida state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-27

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  16. Guidance Regarding Actions That May Proceed During the NEPA Process...

    Office of Environmental Management (EM)

    Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide...

  17. Implementing mitigative actions on the Superconducting Super Collider project

    SciTech Connect (OSTI)

    Sands, T.L. )

    1993-01-01

    The Super Collider is the first project for which a Mitigation Action Plan (MAP) was prepared under a DOE Order that became effective in 1990. The policy requires a MAP for any project where environmental findings were predicated on taking mitigative actions. The MAP must be approved prior to the start of preliminary design and thus cannot be site or facility-specific because the requisite level of detail would not be available. This gap is filled by a series of environmental compliance plans (ECP) that are prepared by the architect-engineer/constructions manager under the direction of the DOE Management and Operations Contractor for the Super Collider. A given ECP identifies the environmental protection measures applicable to the respective contract package. The designated design team uses the ECP as one of its requirements documents and the environmental staff uses it during design reviews to verify compliance with the MAP. Site audits and monitoring data are used to document compliance and verify the effectiveness of mitigative actions, or identify required corrective actions. The applicability of this process to other projects falling within the scope of the National Environmental Policy Act is discussed.

  18. Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action

    SciTech Connect (OSTI)

    1994-09-01

    The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section.

  19. Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming

    SciTech Connect (OSTI)

    1987-06-01

    The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

  20. AUDIT REPORT Corrective Action Systems at the Pantex Plant

    Energy Savers [EERE]

    Systems at the Pantex Plant OAS-L-15-01 October 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 October 20, 2014 MEMORANDUM FOR THE MANAGER, NATIONAL NUCLEAR SECURITY ADMINISTRATION PRODUCTION OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Corrective Action Systems at the Pantex Plant" BACKGROUND The National Nuclear

  1. NE-20 ACTION: SSDP Project Charter Revision CONCURRENCES RTG SYMBOL

    Office of Legacy Management (LM)

    0 ACTION: SSDP Project Charter Revision CONCURRENCES RTG SYMBOL James W. Vaughan, Jr. N-923 Acting Assistant Secretary . for Nuclear Energy Murphi Attached for your signature is a revised Project Charter for the 1/ 86 Shippingport Station Decommissioning Project (SSDP). Since our original M determination in July that there was a need to revise the SSDP Charter, we N K23 have been in discussion with the Richland Operations Field Office (RL). INe Significant differences in management philosophy

  2. Improved information analysis - views and actions

    SciTech Connect (OSTI)

    Sheely, K.B.; Manatt, D.R.

    1995-07-01

    The IAEA continues to assess, develop, and test recommendations for strengthening the cost effectiveness of safeguards. The IAEA`s investigation has focused on ways to increase Agency access to data, including access to sites and site data, export/import data, environmental data, open-source data, and other expanded data sources. Although the acquisition of this raw data is essential to strengthening safeguards, the effectiveness of the system is going to be judged by what the Agency does with the data once they have acquired it. Therefore, the IAEA must have the capability to organize, analyze and present the data in a timely manner for internal management evaluation and external dissemination. The United States Department of Energy has established a Safeguards Information Management Systems (SIMS) Initiative to provide support and equipment which will improve the IAEA`s capability to utilize this expanded data to analyze State`s nuclear activities. This paper will present views on steps to improve information analysis and discuss the status of actions undertaken by the SIMS initiative.

  3. POST-REMEDIAL ACTION REPORT

    Office of Legacy Management (LM)

    POST-REMEDIAL ACTION REPORT . FORTHE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA SEPTEMBER 1995 Prepared for United States' Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACQ5-910R2 1949 Gchtel National, 1nc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r FIGURES iv . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  4. Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect (OSTI)

    Wickline, Alfred

    2006-12-01

    Corrective Action Unit (CAU) 190 is located in Areas 11 and 14 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 190 is comprised of the four Corrective Action Sites (CASs) listed below: (1) 11-02-01, Underground Centrifuge; (2) 11-02-02, Drain Lines and Outfall; (3) 11-59-01, Tweezer Facility Septic System; and (4) 14-23-01, LTU-6 Test Area. These sites are being investigated because existing information is insufficient on the nature and extent of potential contamination to evaluate and recommend corrective action alternatives. Additional information will be obtained before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS by conducting a corrective action investigation (CAI). The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on August 24, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture, and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 190. The scope of the CAU 190 CAI includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling; (2) Conduct radiological and geophysical surveys; (3) Perform field screening; (4) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present; (5) If COCs are present, collect additional step-out samples to define the lateral and vertical extent of the contamination; (6) Collect samples of source material, if present, to determine the potential for a release; (7) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes; and (8) Collect quality control samples. This Corrective Action Investigation Document (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense. Under the FFACO, this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval.

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 504: 16a-Tunnel Muckpile, Nevada Test Site

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-03-15

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 504, 16a-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 504 is comprised of four Corrective Action Sites (CASs): • 16-06-01, Muckpile • 16-23-01, Contaminated Burial Pit • 16-23-02, Contaminated Area • 16-99-01, Concrete Construction Waste Corrective Action Site 16-23-01 is not a burial pit; it is part of CAS 16-06-01. Therefore, there is not a separate data analysis and assessment for CAS 16-23-01; it is included as part of the assessment for CAS 16-06-01. In addition to these CASs, the channel between CAS 16-23-02 (Contaminated Area) and Mid Valley Road was investigated with walk-over radiological surveys and soil sampling using hand tools. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 504. A CADD was originally submitted for CAU 504 and approved by the Nevada Division of Environmental Protection (NDEP). However, following an agreement between NDEP, DTRA, and the DOE, National Nuclear Security Administration Nevada Site Office to change to a risk-based approach for assessing the corrective action investigation (CAI) data, NDEP agreed that the CAU could be re-evaluated using the risk-based approach and a CADD/CR prepared to close the site.

  6. EIS-0111: Remedial Actions at the Former Vanadium Corporation of America Uranium Mill Site, Durango, La Plata County, Colorado

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of several scenarios for management and control of the residual radioactive wastes at the inactive Durango, Colorado, uranium processing site, including a no action alternative, an alternative to manage wastes on site, and three alternatives involving off-site management and decontamination of the Durango site.

  7. Research Proposal Milestones | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposal Milestones Research Proposal Milestones Research Proposal Milestones, from the U.S. Department of Energy's Postdoctoral Research Awards program. Office spreadsheet icon ...

  8. proposed surface and subsurface marker designs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Images of proposed markers for the surface and subsurface Large Surface Marker - Proposed Design with Plaques of Text and Images Small Subsurface Marker - Proposed Design

  9. Category:Proposed deletion | Open Energy Information

    Open Energy Info (EERE)

    History Category:Proposed deletion Jump to: navigation, search This category contains articles which have been proposed for deletion. To tag an article for proposed deletion use...

  10. Enforcement actions: Significant actions resolved material licensees (non-medical). Volume 14, No. 1, Part 3, Quarterly progress report, January--March 1995

    SciTech Connect (OSTI)

    1995-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January--March 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to Material Licensees (non-Medical) with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 190: Contaminated Waste Sites, Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Alfred Wickline

    2008-03-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 190, Contaminated Waste Sites, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (1996, as amended January 2007). Corrective Action Unit 190 is comprised of the following four corrective action sites (CASs): 11-02-01, Underground Centrifuge 11-02-02, Drain Lines and Outfall 11-59-01, Tweezer Facility Septic System 14-23-01, LTU-6 Test Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 190 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from March 21 through June 26, 2007. All CAI activities were conducted as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites, Nevada Test Site, Nevada (NNSA/NSO, 2006). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective process: Determine whether contaminants of concern (COCs) are present. If COCs are present, determine their nature and extent. Provide sufficient information and data to complete appropriate corrective actions. The CAU 190 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the data quality objective data needs.

  12. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  13. Chemical Management

    Energy Savers [EERE]

    DOE-HDBK-11391-2006 May 2006 DOE HANDBOOK CHEMICAL MANAGEMENT (Volume 1 of 3) U.S. ... and contractor managers in assessing chemical hazard management and is approved for ...

  14. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  15. Oil field management system

    DOE Patents [OSTI]

    Fincke, James R.

    2003-09-23

    Oil field management systems and methods for managing operation of one or more wells producing a high void fraction multiphase flow. The system includes a differential pressure flow meter which samples pressure readings at various points of interest throughout the system and uses pressure differentials derived from the pressure readings to determine gas and liquid phase mass flow rates of the high void fraction multiphase flow. One or both of the gas and liquid phase mass flow rates are then compared with predetermined criteria. In the event such mass flow rates satisfy the predetermined criteria, a well control system implements a correlating adjustment action respecting the multiphase flow. In this way, various parameters regarding the high void fraction multiphase flow are used as control inputs to the well control system and thus facilitate management of well operations.

  16. Ecological Data in Support of the Tank Closure and Waste Management Environmental Impact Statement. Part 2: Results of Spring 2007 Field Surveys

    SciTech Connect (OSTI)

    Sackschewsky, Michael R.; Downs, Janelle L.

    2007-05-31

    This review provides an evaluation of potential impacts of actions that have been proposed under various alternatives to support the closure of the high level waste tanks on the Hanford Site. This review provides a summary of data collected in the field during the spring of 2007 at all of the proposed project sites within 200 East and 200 West Areas, and at sites not previously surveyed. The primary purpose of this review is to provide biological data that can be incorporated into or used to support the Tank Closure and Waste Management Environmental Impact Statement.

  17. Action Sheet 36 Final Report

    SciTech Connect (OSTI)

    Kips, R E; Kristo, M J; Hutcheon, I D

    2012-02-24

    Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

  18. Take the Energy Action Challenge

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Students will work in pairs or small groups to apply knowledge of energy-wise habits to evaluate energy use in their homes and schools and make recommendations for improved efficiency. They will use an energy audit tool to collect data on their home and school energy habits and present an action plan to their class. Further communication at the school and district level is encouraged.

  19. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Management Project Management MaRIE is the experimental facility needed to control the time-dependent properties of materials for national security science missions. It ...

  20. Deactivation Management

    Broader source: Energy.gov [DOE]

    The purpose here is to provide information for specific aspects of project management that apply to deactivation. Overall management of deactivation projects should use a traditional project...

  1. Allocation Proposal (ERCAP) Application Deadlines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Application Deadlines Allocation Proposal (ERCAP) Application Deadlines Award Type ERCAP Submission Open ERCAP Submission Deadline Award Decision Allocation Period Startup and Education Ongoing November 10, 2016 Within 3 weeks of applying 18 months from award (but must be renewed for the next allocation year) Production (DOE awarded) for the rest of allocation year (AY) 2016 Ongoing November 10, 2016 Within 4 weeks of applying (pending sufficient DOE reserves of time) through January 9, 2017 All

  2. Risk Assessment & Management Information

    Broader source: Energy.gov [DOE]

    NRC - A Proposed Risk Management Regulatory Framework, April 2012 Risk Assessment Technical Experts Working Group (RWG) web page DOE Standard on Development and Use of Probabilistic Risk Assessment in DOE Nuclear Safety Applications (draft), December 2010 Consortium for Risk Evaluation with Stakeholder Participation Workshop on Risk Assessment and Safety Decision Making Under Uncertainty

  3. Environmental Assessment and FONSI Proposed Decontamination and Disassembly of the Argonne Thermal Source Reactor (ATSR) at Argonne National Laboratory

    SciTech Connect (OSTI)

    N /A

    1998-07-15

    The purpose of this project is to protect human health and the environment from risks associated with the contaminated surplus ATSR. The proposed action is needed because the ATSR, a former experimental reactor, contains residual radioactivity and hazardous materials.

  4. Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants

    Broader source: Energy.gov [DOE]

    The Office of Management and Budget (OMB) has issued a Notice of OMB Action approving the Department of Energy's request to extend for three years the Information Collection Request Title: OE...

  5. Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2005-03-02

    This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for former waste management units, legacy contamination source areas and distribution of contamination in soils, and environmental infrastructure (e.g., caps, monitoring systems, etc.) that is in place or planned in association with RAs. (3) Regulatory considerations and processes for management and disposition of waste soil upon generation, including regulatory drivers, best management practices (BMPs), waste determination protocols, waste acceptance criteria, and existing waste management procedures and BMPs for Y-12. This Soil Management Plan provides information to project planners to better coordinate their activities with other organizations and programs with a vested interest in soil disturbance activities at Y-12. The information allows project managers and maintenance personnel to evaluate and anticipate potential contaminant levels that may be present at a proposed soil disturbance site prior to commencement of activities and allows a more accurate assessment of potential waste management requirements.

  6. Conference Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-03

    To establish requirements and responsibilities with respect to managing conferences sponsored by the Department of Energy (DOE) or by DOE management and operating contractors and other contractors who perform work at DOE-owned or -leased facilities, including management and integration contractors and environmental restoration management contractors (when using funds that will be reimbursed by DOE). Cancels DOE N 110.3.

  7. City of Boulder- Climate Action Plan Fund

    Broader source: Energy.gov [DOE]

    Note: As of 2015, the Climate Action Plan is now referred to as the Climate Commitment. In November 2015, Boulder voters approved an extension of the  Climate Action Plan tax through 2020, with...

  8. Energy Action Month | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Action Month Energy Action Month Energy Action Month Lead our nation to a secure, clean, and prosperous energy future As proclaimed by President Obama, October marks Energy Action Month. With the March announcement of Executive Order 13693: Planning for Federal Sustainability in the Next Decade, the federal government faces even more challenging goals to reduce energy consumption. Agencies are committed to stepping up and adopting more sustainable operations to cut greenhouse gas

  9. Climate Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Climate Action Plan Climate Action Plan Since President Obama's announcement of the Climate Action Plan (CAP) on June 25, 2013, the Department of Energy (DOE) has moved forward to lead initiatives and support interagency efforts that cut carbon pollution, augment resilience and preparedness in the face of climate impacts, and strengthen international partnerships addressing the issue. This effort involves activities all across the Department, including actions led by the Office of International

  10. NREL: Technology Deployment - Climate Action Planning Tool

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Technology Deployment Climate Action Planning Tool Technology Deployment - Climate Action Planning Tool NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to identify which options will lead to the most significant reductions in consumption of fossil fuels and in turn meet greenhouse gas reduction goals. Follow these four steps: Gather baseline energy

  11. EIS-0380: Mitigation Action Plan Annual Report

    Broader source: Energy.gov [DOE]

    Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2012 Mitigation Action Plan Annual Report

  12. Energy Action Month October 2014 Campaign Materials

    Broader source: Energy.gov [DOE]

    Campaign materials for "Transition to a Clean Energy Reality," the theme for Energy Action Month October 2014.

  13. Take Action to Save Energy in Commercial Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Buildings » Take Action to Save Energy in Commercial Buildings Take Action to Save Energy in Commercial Buildings Commercial building owners, operators and tenants can start saving energy today and use those cost savings for other critical parts of their businesses. The Building Technologies Office offers Commercial Buildings Resource Database and opportunities to partner with peers and technical experts. Manage Organizational Energy Use Photo of participants listening to a speaker

  14. U.S. DEPARTMENT OF ENERGYCONTRACT AND PROJECT MANAGEMENT

    Energy Savers [EERE]

    i U.S . DEP ARTMENT OF ENERGY CONTRACT AND P ROJ ECT MANAGEMENT ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION P LAN CLOSURE REPORT FINAL FEBRUARY 2011 iii Executive Summary The Department of Energy (DOE) is committed to making continuous improvements in contract and project management performance. Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. While DOE's contract and project management has been on the Government

  15. Proposal Submittal and Scheduling Procedures for Macromolecular

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crystallography | Stanford Synchrotron Radiation Lightsource Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Patrick Matthews

    2010-07-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): 11-23-05, Pin Stripe Contamination Area 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: No further corrective actions are necessary for CAU 371. A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    SciTech Connect (OSTI)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

  18. Environmental Requirements Management

    SciTech Connect (OSTI)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    SciTech Connect (OSTI)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  20. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  1. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    SciTech Connect (OSTI)

    Owen, P. T.; Webb, J. R.; Knox, N. P.; Goins, L. F.; Harrell, R. E.; Mallory, P. K.; Cravens, C. D.

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  2. 2015 Discovery Science Call for Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    users 2015 Discovery Science Call for Proposal Reference Links: - Basic NIF Specs (User ... proposals via the web based form June 30, 2015. Full proposals are due by September 1, ...

  3. Proposal Submittal and Scheduling Procedures for Macromolecular...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and ... a one-time proposal extension may be submitted for review by the Proposal Review Panel. ...

  4. Iowa state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  5. Maryland State information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  6. Oregon state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  7. Oregon state information handbook formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  8. Massachusetts state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  9. Pennsylvania state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  10. Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions

    Broader source: Energy.gov [DOE]

    DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions.

  11. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  12. Contract/Project Management

    Energy Savers [EERE]

    Second Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 85% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  13. Contract/Project Management

    Energy Savers [EERE]

    Fourth Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Actual FY 2013 Pre- & Post-CAP* Actual Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90% 83% Construction 84% Cleanup 82% 70% Pre-CAP 84% Post-CAP Based on 3-year rolling period (FY11 to FY13) of 93 projects. TPC is Total Project Cost.

  14. Proposal Review Panel | Stanford Synchrotron Radiation Lightsource

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Review Panel Submitting a proposal is the first step to access beam time at SSRL. Proposals are peer reviewed and rated by the SSRL Proposal Review Panel (PRP) on a scale from 1 (highest) to 5 (lowest). Peer reviewers evaluate proposals based on scientific merit, particularly the intellectual impact of the work on the field and the value of using synchrotron radiation to accomplish the proposed work. To ensure consistency in the review process, reviewers use the following rating

  15. Chasing a specter: Risk management for global environmental change

    SciTech Connect (OSTI)

    O'Riordan, T. ); Rayner, S. )

    1989-10-01

    Global environmental change is both a concept and a process that changes in meaning with scientific discovery, public concern, and political responsiveness. It is the relationship between the problems as perceived and the various institutions that help shape and adapt to such problems that defines global environmental change. There is a kind of race between scientific detective work and political adjustment to lessen the likely impacts that predictive science is trying to verify. Risk analysis, because of its capacity to recognize this relationship in many spheres of problem identification, can contribute to the political debate, mostly by proposing institutional redesign of the relationship among scientific research, public entry, and experimental readjustments to consensus formation and international action. This paper discusses the factors involved in global environmental change, the risk management involved, the holistic interpretation, and the environmental impacts. 21 refs., 5 figs., 5 tabs.

  16. NSR&D Call for Proposals 2016

    Broader source: Energy.gov [DOE]

    The Call for Proposals memorandum represents the official 2016 Call for Proposals for the Department of Energy (DOE) Nuclear Safety Research and Development (NSR&D) Program.

  17. LOPP Proposal Checklist | Open Energy Information

    Open Energy Info (EERE)

    of specific proposal requirements for lease of power privilege proposals. Author Bureau of Reclamation Published Department of Interior, 2015 DOI Not Provided Check for DOI...

  18. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    SciTech Connect (OSTI)

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    SciTech Connect (OSTI)

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  20. EIS-0397: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...