Powered by Deep Web Technologies
Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Environmental Assessment - Proposed Actions  

NLE Websites -- All DOE Office Websites (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

2

Description of Proposed Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

3

Corrective Action Management Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Corrective Action Management Program (CAMP) Home CAMP Background DOE Directives Corrective Action Management Team Corrective Action Tracking System (CATS) CAMP Quarterly Reports...

4

Baseline requirements of the proposed action for the Transportation Management Division routing models  

Science Conference Proceedings (OSTI)

The potential impacts associated with the transportation of hazardous materials are important to shippers, carriers, and the general public. This is particularly true for shipments of radioactive material. The shippers are primarily concerned with safety, security, efficiency, and equipment requirements. The carriers are concerned with the potential impact that radioactive shipments may have on their operations--particularly if such materials are involved in an accident. The general public has also expressed concerns regarding the safety of transporting radioactive and other hazardous materials through their communities. Because transportation routes are a central concern in hazardous material transport, the prediction of likely routes is the first step toward resolution of these issues. In response to these routing needs, several models have been developed over the past fifteen years at Oak Ridge National Laboratory (ORNL). The HIGHWAY routing model is used to predict routes for truck transportation, the INTERLINE routing model is used to predict both rail and barge routes, and the AIRPORT locator model is used to determine airports with specified criteria near a specific location. As part of the ongoing improvement of the US Department of Energy`s (DOE) Environmental Management Transportation Management Division`s (EM-261) computer systems and development efforts, a Baseline Requirements Assessment Session on the HIGHWAY, INTERLINE, and AIRPORT models was held at ORNL on April 27, 1994. The purpose of this meeting was to discuss the existing capabilities of the models and data bases and to review enhancements of the models and data bases to expand their usefulness. The results of the Baseline Requirements Assessment Section will be discussed in this report. The discussions pertaining to the different models are contained in separate sections.

Johnson, P.E.; Joy, D.S.

1995-02-01T23:59:59.000Z

5

Riverland expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

6

Implementation Proposal for the National Action Plan on Demand...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for the National Action Plan on Demand Response - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to...

7

N Springs expedited response action proposal  

SciTech Connect

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

8

Federal Energy Management Program: Energy Action Month  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Action Month to someone by E-mail Share Federal Energy Management Program: Energy Action Month on Facebook Tweet about Federal Energy Management Program: Energy Action Month...

9

Property:NEPA Proposed Action | Open Energy Information  

Open Energy Info (EERE)

Proposed Action Proposed Action Jump to: navigation, search Property Name NEPA Proposed Action Property Type Text Pages using the property "NEPA Proposed Action" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + NGP is proposing a geothermal development project which includes the construction and operation of power generation facilities, geothermal fluid production and injection well pads and wells, access roads, geothermal fluid pipelines, groundwater production wells, an electrical transmission line and switching station, and support facilities. NGP submitted an application (N-82701) and Plan of Development (PoD) to the BLM Winnemucca Field Office (WFO), for approval of a right-of-way (ROW) for those portions of the transmission line located on public lands managed by the BLM. SPPCo submitted an application (N-83479) to the BLM WFO for approval of a ROW for the electrical switching station to be built at the point of interconnection of the NGP transmission line with the existing SPPCo transmission line. An Operations Plan was submitted for approval to drill and test geothermal wells proposed on public land (within federal geothermal lease NVN-58196) which would be used for the project. A Utilization Plan was submitted for approval of utilization facilities proposed on public land to be used for the project. Geothermal Drilling Permits (GDPs) will be submitted for downhole casing and cementing engineering approval for each well as the project progresses.

10

Chapter 2 - Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES The WIPP facility, in addition to serving its primary mission as a TRU waste disposal site, needs to perform a variety of actinide chemistry experiments to (1) support WIPP's recertification efforts, (2) address scientific questions important to WIPP, (3) improve TRU waste characterization techniques, and (4) improve DOE's understanding of how the waste interacts with the natural environment in order to better understand waste isolation performance. In the past, WIPP-related actinide chemistry experiments have taken place at DOE laboratory facilities at other DOE sites such as LANL. However, due to reductions in travel budgets and additional security requirements being imposed on DOE weapons

11

Implementation Proposal for The National Action Plan on Demand Response |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

12

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(MOFs) that can be regenerated electrically for use in future high efficiency electric vehicle (EV) heat pumps. Proposed work consists of indoor laboratory-based research and...

13

Chapter 2 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

for the other proposed improvements based on a conceptually defined site "buildout" scenario. A bounding analysis uses simplifying assumptions and analytical methods that are...

14

ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE  

Office of Legacy Management (LM)

ACTION DESCRIPTION MEMORANDUM ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 1 Background and Need for Action ..................... 2 Proposed Remedial Action ........................ 3 Potential Issues ................... ......... 4 Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 6 Tables. ............ .................. 7 References ................... ............ 8

15

VA Energy Management Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

16

4.0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES 0 IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES This chapter evaluates the environmental consequences of the proposed action (Section 4.1) and of the alternatives (Section 4.2) . The analysis focuses primarily on impacts associated with routine operation of the glass melter. In some instances (such as human health) , additional analysis is provided for accident conditions. 4.1 THE PROPOSED ACTION The proposed action was evaluated to determine the potential impacts of a number of environmental components, including air quality, surface water quality, and biological resources, as well as the potential effects to human health and safety. The potential impacts to these receptors are evaluated in the following subsections. No impact pathways were identified for land use, socioeconomics, or groundwater resources.

17

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND 4. ENVIRONMENTAL IMPACTS OF THE PROPOSED ACTION AND ALTERNATIVES . This section describes potential environmental impacts of the proposed action and alternatives. If the proposed action is implemented, activities would be limited to existing facilities. A WERF modification would be required to allow for injection of an atomized aqueous waste stream into the incinerator lower chamber. The installation would be performed within the WERF incinerator/stabilization building and may use an existing incinerator access port. Installation work would be similar to many routine maintenance and modification actions at WERF. A detailed analysis of potential impacts from processing INEL-generated LL W at commercial facilities is not presented in this EA because specific commercial facilities and processes have not

18

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'u ", lt~Fs::::N 'u ", lt~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to construct a maintenance garage for heavy vehicles and equipment at the Springfield, Missouri facility. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 7,2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.15- Siting, construction or modification of support structures within or contiguous to an already developed area. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the

19

Federal Energy Management Program: Energy Action Month  

NLE Websites -- All DOE Office Websites (Extended Search)

Template Customizable Poster Template 8 12" x 11" 16" x 20" The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote...

20

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

proposes to add additional shop and office space onto two existing facilities proposes to add additional shop and office space onto two existing facilities located at the Jonesboro, Arkansas Maintenance Facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: May 09, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0 , Part B1 .15- Siting, construction or modification, and operation of support buildings and structures within or contiguous to an already developed area . REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class,

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

install pole-mounted safety light(s) at the Gore, Oklahoma install pole-mounted safety light(s) at the Gore, Oklahoma substation facility. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: September 1, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart 0, Part B2.3- Installation of equipment for personnel safety and health. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A& B to Subpart D. For classes of action listed in Appendix A or B, the following conditions are integral elements, i.e., to fit within a class, the proposal must riot: (a.) Threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, including DOE and/or Executive Orders;

22

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Entergy Arkansas, Inc. (Entergy) proposes to establish an interconnection between the system of Southwestern Power Administration and the system of Entergy in Carroll County, Arkansas. The interconnection would require Entergy to construct a new switching station at the interconnection site in addition to an approximately 5 mile length of transmission line. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: April 11,2011 NUMBERS AND TIT!-ES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.12- Construction of electric powerlines approximately 10 miles in length or less, not integrating major new sources. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B): (1) The proposed action fits within a class of actions that is listed in Appendix A & B to Subpart D. For classes

23

Microsoft Word - Updated Proposed Action 2004 SA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2004 December 27, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE/EIS-0312/SA-01) Sarah McNary Senior Policy Advisor Proposed Action: Updated Proposed Action (UPA) for the FCRPS Biological Opinion Remand Location: The action area of the UPA, including areas where the UPA directly or indirectly affects listed salmonids consists of the following areas: * The mainstem Columbia River, including and downstream of Libby and Hungry Horse dams and reservoirs; the Snake River below the confluence with the Salmon River; and the Clearwater River below Dworshak reservoir and dam, down to and including the Columbia River estuary and plume. * The estuary and plume, which includes the area immediately off the mouth of the Columbia

24

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

25

Corrective action management (CAM) process guide  

SciTech Connect

Consistent direction for identification, long-term reporting and trending, and correction of conditions adverse to the environment, safety and health will facilitate a successful transition and follow- on for the Project Hanford Management Contractor (PHMC). Continuity of the corrective action management process is vital. It provides consistency via reporting and trending on corrective action management activities at the Site during the transition process. To ensure success,consideration of the business rules and the Hanford Action Tracking System (HATS), the automated tool that supports them, is essential. This document provides a consolidated synopsis of corrective action management business rules, the process, and the HATS to support the transition process at Hanford. It applies to the baseline of corrective action work the PHMC and its subcontractors will inherit. HATS satisfies the requirement for collection of data that enables long-term reporting and trending. The information contains all originating document, condition,and action data. HATS facilitates consistent tracking,reporting, closure, and trending of the corrective action work in progress across the Site. HATS follows the glossary standard definitions for commitment tracking listed in Appendix A and Site data value standards that are applicable. For long term access and use, HATS data are fed to a full text search and retrieval system called Search Hanford Accessible Reports Electronically(SHARE). An individual, organization, or company has the ability, through SHARE, to pull together the appropriate information as needed.

Lutter, T.M., Westinghouse Hanford

1996-06-18T23:59:59.000Z

26

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'IU "~I :~~~r;::::N 'IU "~I :~~~r;::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration proposes to perform aerial saw tree trimming activities along select portions of transmission line rights-of-ways located in eastern Oklahoma during the early winter of 2011. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: December 10, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.3- Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and railroads), vehicles and equipment, and localized vegetation and pest control, during which operations may be suspended and resumed.

27

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

NLE Websites -- All DOE Office Websites (Extended Search)

CATEGORICAL EXCLUSION (CX) DETERMINATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of

28

CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Zi~Fs::::N Zi~Fs::::N CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to accommodate a request, on behalf of Farrell- Cooper Mining Company, to lower and bury a small section of Southwestern's electrical lines to allow for the crossing of a large piece of mining equipment through the transmission line rights-of-way in Haskell County, Oklahoma. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart D, Part B4.9- Grant or denial of requests for multiple use of transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and

29

Categorical Exclusion (CX) Determination Proposed Action: Havre Substation, Stage 03.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Havre Substation, Stage 03. Havre Substation, Stage 03. Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the Havre Substation approximately 150 ft to the north to accommodate a new delivery service from the newly built Herron Substation by Hill County. The expansion also converts the existing 115-kV single bus into a ring bus which will improve reliability. Western is also expanding the yard to the east to accommodate the replacement of the existing control building and control boards. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.11: Construction of electric power substations .. . or modification of existing substations and support facilities . Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

30

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~~Fs::::N ~~Fs::::N CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration performed emergency construction activities to repair a levee, stabilize a bank, and complete drainage improvements as a result of damage incurred during recent heavy rains at the Jonesboro Maintenance Office and adjacent substation facility located in Craighead County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart 0 , Part B 2.5- Safety and environmental improvements of a facility, including replacement and upgrade of facility components, that do not result in a significant change in the

31

Categorical Exclusion Determination Form Proposed Action Title: (0675-1570) Washington University in St. Louis -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) Washington University in St. Louis - 0) Washington University in St. Louis - Optimal Operation and Management of Energy Storage Systems Based on Real-Time Predictive Modeling and Adaptive Battery Management Techniques Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): St. Louis, MO; Golden, CO Proposed Action Description: Funding will support efforts to develop a battery management system for electric vehicle batteries capable of accurately predicting a battery's charge and health in order to make control decisions that improve battery safety, charging rate, useful capacity, and battery lifetime. Proposed work will consist of: (1) development of baseline physics models for the battery management; (2) optimization of the baseline physics

32

Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment n rgy partment n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1621) Autogrid, Inc. - Highly Dispatchable and Distributed Demand Response for the Integration of Distributed Generation Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): California and New York Proposed Action Description: Funding will support development a highly distributed Demand Response Optimization and Management System for Real-time (DROMS-RT) power flow control software to support large scale integration of distributed renewable generation sources into the electricity grid. Proposed work consists of (1) developing a web-based software platform to enable full DROMS-RT functionality; (2) developing standards for

33

Categorical Exclusion Determination Form Proposed Action Title: (0675-1578) Robert Bosch LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8) Robert Bosch LLC - 8) Robert Bosch LLC - Advanced Battery Management System Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): Bosch RTC (Palo Alto, CA); Cobasys, LLC (Orion, MI); University of California - San Diego (San Diego, CA) Proposed Action Description: Funding will support efforts to develop an adaptive battery management system that controls battery charging and discharging so as to enable fuller, more efficient battery utilization . Proposed work will consist of: (1 ) development of real-time estimation and control strategies for estimating battery performance; (2) design , development, and fabrication of small-scale Lithium-ion battery cells with an electrochemical-based battery management system; and (3) conducting analytical modeling and testing to characterize and validate system performance.

34

Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action  

SciTech Connect

This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

Not Available

1993-12-01T23:59:59.000Z

35

Sodium Dichromate Barrel Landfill expedited response action proposal  

SciTech Connect

The US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Sodium Dichromate Barrel Landfill. The Sodium Dichromate Barrel Disposal Site was used in 1945 for disposal of crushed barrels. The site location is the sole waste site within the 100-IU-4 Operable Unit. The Waste Information Data System (WIDS 1992) assumes that the crushed barrels contained 1% residual sodium dichromate at burial time and that only buried crushed barrels are at the site. Burial depth is shallow since visual inspection finds numerous barrel debris on the surface. A non-time-critical ERA proposal includes preparation of an engineering evaluation and cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the landfill is the only waste site within the operable unit, the ERA will present a final remediation of the 100-IU-4 operable unit.

Not Available

1993-09-01T23:59:59.000Z

36

Federal Energy Management Program: Develop an Institutional Change Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Develop an Develop an Institutional Change Action Plan for Sustainability to someone by E-mail Share Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Facebook Tweet about Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Twitter Bookmark Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Google Bookmark Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Delicious Rank Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Digg Find More places to share Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on AddThis.com...

37

Categorical Exclusion Determination Form Proposed Action Title: (0473-1529) Charles River Associates International Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29) Charles River Associates International Inc. - 29) Charles River Associates International Inc. - Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Massachusetts, Pennsylvania, Washington Proposed Action Description: Funding will support development of Topology Control, an algorithmic and software technology framework that will improve the efficiency of the electrical grid by implementing appropriate short-term changes of transmission line status to manage transmission congestion and uncertainties associated with integration of renewable generation sources into the electricity grid. Proposed work consists of (1) developing and validating a large power system model that accurately simulates day-ahead and intra-day power

38

DOE Issues Request for Proposals Seeking a Contractor to Manage...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm...

39

Request for Personnel Actions (For Managers and Adminstrative Officers) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Personnel Actions (For Managers and Adminstrative Request for Personnel Actions (For Managers and Adminstrative Officers) Request for Personnel Actions (For Managers and Adminstrative Officers) Headqaurters uses the CHRIS Workflow Tool to submit and process Personnel Actions. There is no longer a need for a hard copy Standard Form-52 (SF-52). Each personnel action is approved via CHRIS workflow and is the official SF-52. All actions must be in the Human Resource office (Personnel Inbox - Step 8) for processing by the Friday before the effective date of the action. All supporting documentation must be attached or this will delay the process, causing the Human Resources Office to change the effective date to the next pay period. The manager or administrative officer must initiate the action in workflow along with assigning approving officials (the same approving

40

Federal Energy Management Program: Create Your Own Energy Action...  

NLE Websites -- All DOE Office Websites (Extended Search)

Create Your Own Energy Action Campaign to someone by E-mail Share Federal Energy Management Program: Create Your Own Energy Action Campaign on Facebook Tweet about Federal Energy...

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project  

SciTech Connect

Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded.

Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Yerace, P.J. [USDOE Fernald Area Office, Cincinnati, OH (United States)

1996-02-01T23:59:59.000Z

42

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Southwestern) proposes to replace the shield wire, fiber-optic cable, (Southwestern) proposes to replace the shield wire, fiber-optic cable, conductor, structures, and all associated hardware on the Idalia to Asherville 161 kV, 22 mile transmission line located in Butler and Stoddard County, Missouri. PROPOSED BY: Southwestern Power Administration - U.S. Dept. of Energy DATE: October 13,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B4.6- Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including , but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors,

43

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Southwestern Power Administration (Southwestern) proposes to modify and/or construct several Arkansas, Oklahoma, and Missouri communication tower facilities to facilitate the spectrum relocation of Federal communications systems in conjunction with the Commercial Spectrum Enhancement Act (CSEA, Title II of P.L. 108-494). Communication tower facility modifications and construction activities include 13 tower replacements, 16 tower removals, and 6 communication site dispositions. The 35 tower project locations, identified by state, include: ~ Arkansas- Hardy, Melbourne, Paragould, Piggott, Bethel, Bull Shoals, Norfork, Piggott, Poteau Mountain, Decatur, Sulphur Rock, Van Buren, Winesburg, and Humphrey ~ Oklahoma- Broken Bow Project Office, Broken Bow Powerhouse, Gore Substation, Lamar, Weleetka,

44

Environmental Management Root Cause Analysis Corrective Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Environmental Management Search form Search Office of Environmental Management Services Waste Management Site & Facility Restoration...

45

Groundwater Monitoring Guidance for the Industry Action Plan on Coal Combustion Product Management  

Science Conference Proceedings (OSTI)

The US Environmental Protection Agency (USEPA) is scheduled to release federal guidelines for management of coal combustion products (CCPs) in 2007. The utility industry has developed a voluntary Action Plan as an alternative to the federal guidelines. In either case, groundwater monitoring will be required. The purpose of this report is to provide guidance for implementing a groundwater-monitoring program at CCP management sites consistent with the Action Plan proposed by the utility industry.

2005-12-07T23:59:59.000Z

46

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

obtain an easement for an existing access road obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of the transferred structures and equipment, for residential, commercial, or industrial uses. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B):

47

SB 4 Interim Well Stimulation Treatment Regulations Notice of Proposed Emergency Rulemaking Action  

E-Print Network (OSTI)

SB 4 Interim Well Stimulation Treatment Regulations Notice of Proposed Emergency Rulemaking Action Page 1 of 10 SB 4 INTERIM WELL STIMULATION TREATMENT REGULATIONS NOTICE OF PROPOSED EMERGENCY that the California Department of Conservation (Department) proposes to adopt emergency regulations necessary

48

DOE Issues Draft Request for Proposals Seeking Contractor to Manage,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Draft Request for Proposals Seeking Contractor to DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant April 1, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP)seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico. The estimated value of the anticipated contract is from $130 to $160 million per year, for five years, with an option to extend the contract for an additional five years. DOE anticipates awarding a competitive, cost-plusaward-fee

49

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

385: Notice of Proposed Floodplain and Wetland Actions 385: Notice of Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

50

EIS-0385: Notice of Proposed Floodplain and Wetland Actions | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Floodplain and Wetland Actions Proposed Floodplain and Wetland Actions EIS-0385: Notice of Proposed Floodplain and Wetland Actions Site Selection for the Expansion of the Strategic Petroleum Reserve Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by the Energy Policy Act of 2005. DOE hereby gives early notice that it will include in the Draft EIS a floodplain and wetland assessment prepared in accordance with the DOE Regulations for Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) and provides for early public input. DOE/EIS-0385, Department of Energy, Notice of Proposed Floodplain and Wetland Actions for the Site Selection for the Expansion of the Strategic

51

Environmental Restoration Remedial Action Program records management plan  

SciTech Connect

The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan ((FOMP) DOE-RL 1989) describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document ((QARD) DOE-RL 1991), provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig.

Michael, L.E.

1991-07-01T23:59:59.000Z

52

Transition of Long-Term Response Action Management Requirements  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this memorandum is to provide you with additional guidance for planning the transition of long-term response action management requirements to receiving Program Secretarial Offices ...

53

Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nergy nergy Categorical Exclusion Determination Form Proposed Action Title: (0473-1601) Sandia National Laboratories - Improved Power System Operations Using Advanced Stochastic Optimization Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): New Mexico, Iowa, Massachusetts, Washington, and California Proposed Action Description: Funding will support development of an integrated probabilistic decision-making software that can account for uncertain conditions that affect renewable energy sources to ensure reliable and efficient use of power system assets and enforce AC power flow constraints. Proposed work consists of (1) developing a two-stage optimized algorithm for the stochastic unit commitment and economic dispatch and pricing

54

Uranium Mill Tailings Remedial Action Project surface project management plan  

SciTech Connect

This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

Not Available

1994-09-01T23:59:59.000Z

55

Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rtm nt n rgy rtm nt n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1510) Texas Engineering Experiment Station - Robust Adaptive Topology Control (RATC) Program or Pield Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Texas, Arizona, California, New Jersey, and Tennessee. Proposed Action Description: Funding will support development an algorithmic Topology Control software to enable real-time, automated control over the transmissions lines within the electricity grid during unexpected power supply interruptions caused by intermittent availability of renewable generation sources, and cascading network failures due to extreme operating conditions or malicious attacks. Proposed work consists of (1) developing a fast, adaptive topology control algorithm to identify actions that will mitigate effects of unexpected

56

Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rg rg Categorical Exclusion Determination Form Proposed Action Title: (0471-1606) United Technologies Research Center - Thermal Storage Using Hybrid Vapor Compression Adsorption System Program or Field Office: Advanced Research Projects Agency - Energy Location{s) (City/County/State): Connecticut, Michigan Proposed Action Description: Funding will support development of an advanced climate control system for plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) utilizing a hybrid thermal battery that employs a unique approach of adsorbing refrigerant on a metal salt. Proposed work consists of indoor laboratory-based research and development and office-based engineering analysis, including (1) synthesis, characterization, and testing of metal salts and refrigerant fluids for use in the thermal battery system, (2) computer-based design and

57

Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'Department of Energy 'Department of Energy Categorical Exclusion Determination Form Proposed Action Title: (0672-1502) General Electric Global Research (GE) - Chilled Natural Gas for At-Home Refueling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Troy, NY; Columbia, MO Proposed Action Description: Funding will support efforts to develop a compressor technology for at-home refueling of natural gas vehicles. Proposed work will consist of: (1) development, synthesis, and testing of small quantities of adsorbent material at a dedicated laboratory facility on the University of Missouri campus in Columbia, MO; (2) design, fabrication (or procurement), and testing of compressor system components, including a cryocooler and an accumulator, at Chart Industries, Inc.'s commercial development and assembly site in Troy, NY; and (3) assembly

58

Categorical Exclusion (CX) Determination Proposed Action: Expansion of O'Fallon Creek Substation Yard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expansion of O'Fallon Creek Substation Yard Expansion of O'Fallon Creek Substation Yard Description of Proposed Action: The Western Area Power Administration (Western) is proposing to expand the current yard to accommodate an additional bay for a dedicated electrical feed to a future oil pumping station that will be part of the Keystone XL project. Number and Title of Categorical Exclusions Being Applied: 10 CFR 10210410 Subpmi D, Appendix B, B4.11: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with the Regulatory Requirements for the National Environmental Policy Act at 10 CFR 1021AI0(b), require the following determinations be made in order for a proposed action to be categorically

59

Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

rgy rgy ·Submitby£-mail Categorical Exclusion Determination Form Proposed Action Title: (0474-1528) Ideal Power Converters Inc. - Dual Bi-Directional Silicon IGBTs Modules Enables Breakthrough PV Inverter Using Current-Modulation Topology Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCitY/County/State): California, New York, Virginia, Texas Proposed Action Description: Funding will support development of a low-cost, high-efficiency 100 kW power inverter to connect photovoltaic (PV) solar panels to the grid, using revolutionary bi-directiona linsulated gate bipolar transistor (BD-IGBT) switches and dual chip modules. Proposed work consists of indoor laboratory-based research and development (R&D) and semiconductor fabrication, including (1) device

60

Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partment of n rgy partment of n rgy Categorical Exclusion Determination Form Proposed Action Title: (0473-1579) GE Global Research - Nanoclay-reinforced Ethylene-Propylene-Rubber for Low Cost HVDC Cabling Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) (City/County/State): Niskayuna, NY Proposed Action Description: Funding will support development of a low cost, extrudable, nanoclay-reinforced ethylene-propylene-rubber (EPR) for making high voltage direct current (HVDC) cable. Proposed work will consist of (1) indoor, laboratory-based synthesis, characterization, and testing of nanoclay-reinforced EPR and (2) computer- based modeling of the performance characteristics and production cost of the nanoclay-reinforced EPR HVDC cable at full scale.

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

partme t nerg partme t nerg Categorical Exclusion Determination Form Proposed Action Title: (0471-1554) Pacific Northwest National Laboratory - Reversible Metal Hydride Thermal Storage for High Temeprative Power Generation Systems Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah and Washington Proposed Action Description: Funding will support development of a novel, metal hydride-based thermal energy storage (TES) system for use with concentrated solar power or nuclear power generating systems. Proposed work consists of indoor laboratory-based research and development, including (1) materials synthesis, characterization, and testing to develop and optimize reversible metal hydride materials, (2) design and fabrication of a bench-scale 3kWh prototype TES unit, and (3) testing,

62

Managing low-level radioactive wastes: a proposed approach  

SciTech Connect

In 1978, President Carter established the Interagency Review Group on Nuclear Waste Management (IRG) to review the nation's plans and progress in managing radioactive wastes. In its final report, issued in March 1979, the group recommended that the Department of Energy (DOE) assume responsibility for developing a national plan for the management of low-level wastes. Toward this end, DOE directed that a strategy be developed to guide federal and state officials in resolving issues critical to the safe management of low-level wastes. EG and G Idaho, Inc. was selected as the lead contractor for the Low-Level Waste Management Program and was given responsibility for developing the strategy. A 25 member task force was formed which included individuals from federal agencies, states, industry, universities, and public interest groups. The task force identified nineteen broad issues covering the generation, treatment, packaging, transportation, and disposal of low-level wastes. Alternatives for the resolution of each issue were proposed and recommendations were made which, taken together, form the draft strategy. These recommendations are summarized in this document.

Peel, J.W.; Levin, G.B.

1980-01-01T23:59:59.000Z

63

Categorical Exclusion Determination Form Proposed Action Title: (0675-1511) Ford Motor Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11) Ford Motor Company - 11) Ford Motor Company - High Precision Tester for Automotive and Stationary Batteries Program or Field Office:Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Dearborn, MI; Albuquerque, NM; College Station, TX Proposed Action Description: Funding will support efforts to develop a high precision battery tester to measure key battery characteristics during charge/discharge cycles to improve the accuracy and precision of Columbic Efficiency and predicted life expectancy estimates. Proposed work will consist of: (1) development and validation of a low current battery tester that meets established performance objectives and (2) development and validation a high current battery tester that meets established performance objectives.

64

Categorical Exclusion Determination Form Proposed Action Title: (0473-1543) Georgia Tech Research Corporation-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1543) Georgia Tech Research Corporation- 3-1543) Georgia Tech Research Corporation- Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-Reliable Green Electricity Internetworks Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Georgia Proposed Action Description: Funding will support development of an internet-like software architecture capable of independently controlling and coordinating distributed energy sources generated by "prosumers," such as wind and solar power, to improve the reliability, efficiency, flexibility, and communications within the electrical grid. Proposed work consists of (1) developing an independently networked inverter controller that incorporates Kuramoto oscillators to reduce required

65

Categorical Exclusion Determination Form Proposed Action Title: (0470-1541) Chromatin Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41) Chromatin Inc. - 41) Chromatin Inc. - Plant Based Sesquiterpene Biofuels Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Kansas, Kentucky, Illinois, Ohio Proposed Action Description: Funding will support development of genetically modified (GM) sweet sorghum (Sorghum bicolor) to produce increased levels of farnesene , a drop-in biofuel. Proposed work will consist of (1) transforming sweet sorghum with mini-chromosomes carrying limiting genes and metabolic pathway genes to increase farnesene synthesis; (2) evaluating and optimizing genes from plants, E. coli, and yeast (Saccharomyces cerevisiae) to improve enzymatic activity and specificity; (3) testing plasmid constructs and evaluating optimized genes in a model plant, guayule

66

Transformational Energy Action Management (TEAM) Wireless Energy Efficiency Keys Initiative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by by Transformational Energy Action Management (TEAM) Wireless Energy Efficiency Keys Initiative *Ways of Using Wireless Technology to Help You Reduce Energy Usage at your Facility Together with our industry partners, we strive to: * Accelerate adoption of the many energy-efficient technologies and practices available today * Conduct vigorous technology innovation to radically improve future energy diversity, resource efficiency, and carbon mitigation * Promote a corporate culture of energy efficiency and carbon management What Is the Industrial Technologies Program ? The Industrial Technologies Program (ITP) is the lead federal agency responsible for improving energy efficiency in the largest energy-using sector of the country. Industrial Sector National Initiative

67

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance Appliance Standards Program The FY 2003 Priority- Setting Summary Report and Actions Proposed Date: August 22, 2002 Table of Contents i EXECUTIVE SUMMARY.............................................................................................. iv 1 Energy Conservation Program - Product Prioritization Process.......1-1 1.1 Background on Appliance Standards Program........................................... 1-1 1.2 DOE Authority to Add Products ................................................................ 1-2 1.2.1 Consumer Products .................................................................................... 1-3 1.2.2 Commercial Products................................................................................. 1-5 1.2.2.1 Products Regulated under EPCA Provisions Concerning Consumer

68

Categorical Exclusion Determination Form Proposed Action Title: (0474-1592) Satcon Technology Corp. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-1592) Satcon Technology Corp. - 4-1592) Satcon Technology Corp. - Agile Direct Grid Connect Medium Voltage 4.7-13.8kV Power Converter for PV Applications Utilizing Advanced Wide Band Gap Devices Program or Field Office:Advanced Research Projects Agency - Energy Location{s) (City/County/State): Massachusetts, New Mexico, North Carolina, Pennsylvania Proposed Action Description: Funding will support development of an early stage prototype of a solid-state power inverter capable of converting low-voltage input power generated by utility-scale solar farms to medium voltage AC output power for transmission to the electric grid, increasing energy yield and reducing equipment costs. Proposed work consists of indoor laboratory-based research and development (R&D) and device testing, including (1) design, fabrication, and

69

Categorical Exclusion Determination Form Proposed Action Title: (0470-1532) Arcadia Biosciences, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32) Arcadia Biosciences, Inc. - 32) Arcadia Biosciences, Inc. - Vegetative Production of Oil in a C4 Crop Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Davis, CA Proposed Action Description: Funding will support development of genetically modified (GM) Setaria viridis (Setaria) that produces triacylglycerol (vegetable oil) in the tissues of I. the plant in place of starch. If the work performed under the award is successful, Arcadia will incorporate the gene combinations developed in _ Setaria into sorghum. Proposed work will consist of laboratory-based (1) genetic modification of E. coli to construct vectors for implementing oil production genes in Setaria; (2) genetic modification of Setaria to express gene combinations for three different pathways that are critical to oil synthesis; and (3)

70

Categorical Exclusion Determination Form Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97) Smart Wire Grid, Inc. - 97) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): California, Missouri, North Carolina, Georgia, Wash ington, Pennsylvania, and Tennessee Proposed Action Description: Funding will support development of a Smart Wire System Controller and an energy router software to enable distributed agents to coordinate with the control center, improve power flow control, and take advantage of unused capacity within the existing transmission system. In addition, the power controller will enable grid operators to optimize transmission assets to fully integrate variable renewable energy sources. Proposed work consists of (1) designing, developing, testing, and optimizing the Smart Wire System Controller to meet utility specifications; (2)

71

Categorical Exclusion Determination Form Proposed Action Title: (0674-1585) Xilectric, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

585) Xilectric, Inc. - 585) Xilectric, Inc. - Low Cost Transportation Batteries Program or Field Office: Advanced Research Projects Agency - Energy (ARPA-E) LocationCs) CCity/County/State): University of Rhode Island (Kingston, RI); Electrosynthesis, Inc. (Lancaster, NY) Proposed Action Description: Submit by E-mail JI Funding will support efforts to develop a new class of low-cost rechargeable battery chemistries based on the Edison battery chemistry that have the potential to exceed energy densities of 400 Wh/kg and 600 Wh/L at a battery materials cost less than $50/kWh. These battery systems will be built from materials that are earth-abundant, environmentally friendly, and cheap with a cell architecture that is inexpensive to manufacture and electrode structures expected to have extremely long cycle life. Proposed work will consist of: (1) testing, thermodynamic characterization, and

72

Proposed Action Title: (0470-1517) Donald Danforth Plant Science Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(0470-1517) Donald Danforth Plant Science Center - (0470-1517) Donald Danforth Plant Science Center - Center for Enahnced Camelina Oil Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City/County/State): Michigan, Missouri, Montana, Nebraska, New Mexico Proposed Action Description: Funding will support development of genetically modified (GM) camelina that grows at an increased yield and produces more seed oil than wild- type camelina for use as a biofuel feedstock. Proposed work will consist of (1) genetically modifying camelina to improve carbon capturel assimilation and light utilization, and to redirect carbon flux towards seed oil synthesis, including synthesis of oleic acid; (2) fabricating and testing phenomics chambers used to analyze plant metabolism under varying conditions (e.g. humidity, temperature); (3) growing selected lines of non-GM, wild-type camelina in contained

73

Categorical Exclusion Determination Form Proposed Action Title: (0674-1610) TVN Systems, Inc. -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

610) TVN Systems, Inc. - 610) TVN Systems, Inc. - Hydrogen/Bromine Electrical Energy Storage System Program or Field Office :Advanced Research Projects Agency - Energy (ARPA-E) Submit by E-mail LocationCs) CCity/County/State): TVN Systems, Inc. (Lawrence, KS); Vanderbilt University (Nashville, TN); University of Kansas (Lawrence, KS) Proposed Action Description: Funding will support efforts to develop a cost-effective hydrogen-bromine flow battery that utilizes advanced membrane materials, unique catalysts, a novel shunt current protection system , and advanced cell and system designs. Proposed work will consist of: (1) synthesizing active and stable Rhodium-sulfer based electro-catalytic materials for hydrogen reactions; (2) fabricating and testing nanofiber composite membranes;

74

Categorical Exclusion Determination Form Proposed Action Title: (0473-1520) Michigan State Un  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-1520) Michigan State Un 3-1520) Michigan State Un iversity - Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): East Lansing, MI Proposed Action Description: Funding will support the development of a transformer-less unified power flow controller (UPFC) that can efficiently and economically control distributed and intermittent power flow generated by wind and solar power sources through existing transmission lines. Proposed work will consist of indoor activities to (1) engage in a system-level simulation of the new UPFC with a real-time simulator; (2) design, develop , and electronically fabricate three prototype 15-kV/1.5-MVA transformer-less UPFCs; (3) construct a temporary, 15-kV mobile testing

75

Categorical Exclusion Determination Form Proposed Action Title: (0208-1695) Sustainable Energy Solutions LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

208-1695) Sustainable Energy Solutions LLC - 208-1695) Sustainable Energy Solutions LLC - Cryogenic Carbon Capture (Phase 2) Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Utah; Wyoming Proposed Action Description: Funding will support development of a cryogenic carbon capture (CCC) process for separating carbon dioxide from flue gas via desublimination of the flue gas and compression of the resulting solid and liquid products. Proposed work will consist of (1) design, fabrication/acquisition, and testing of components for the pilot-scale prototype CCC system; (2) integration of the components into a skid-mounted, pilot-scale prototype CCC system; and (3) testing of the skid-mounted, pilot-scale prototype CCC system using actual or simulated flue gas streams.

76

Categorical Exclusion Determination Form Proposed Action Title: (0675-1534) GE Global Research -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34) GE Global Research - 34) GE Global Research - Control Enabling Solutions with Ultrathin Strain and Temperature Sensor System for Reduced Battery Life Cycle Cost Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Niskayuna, NY; Ann Arbor, MI; Dearborn, MI Proposed Action Description: Funding will support efforts to develop a a novel sensor system with supporting multi-physics models to increase battery cell lifetime and extend battery range for electric vehicle applications. Proposed work will consist of: (1) development and fabrication a novel multi-measurand sensor capable of measuring strain and temperature across multiple battery cells; (2) performance of strain and temperature testing and development and validation of multi-physics models; (3)

77

Executive Director for Operations /RA/ SUBJECT: PROPOSED RULEMAKINGPOST-FIRE OPERATOR MANUAL ACTIONS (RIN 3150  

E-Print Network (OSTI)

To obtain Commission approval to publish the proposed rule, including the issue of the need for an interim enforcement discretion policy and make available the draft regulatory guide and other supporting documents for public comment. BACKGROUND: In SECY-03-0100, Rulemaking Plan on Post-Fire Operator Manual Actions, dated June 17, 2003, the staff recommended revising the existing fire protection regulation in paragraph III.G.2 of Appendix R to 10 CFR Part 50 to include operator manual actions. These actions are needed to ensure that a redundant train of systems necessary to achieve and maintain hot shutdown conditions located within the same area outside the primary containment is free of fire damage. In an SRM dated September 12, 2003, the Commission approved the staffs recommendation to revise the fire protection program requirements in Appendix R and the associated guidance. The Commission also approved the staffs plan to develop an interim enforcement policy to deal with compliance issues until the guidance and final rule are implemented. CONTACT:

Luis A. Reyes; David Diec Nrr/drip

2004-01-01T23:59:59.000Z

78

Energy-MAP: energy management and action plan  

DOE Green Energy (OSTI)

The City of Garden Grove created an energy program within its municipal operation during 1980, and subsequently developed the Energy Management and Action Plan (Energy-MAP). A community energy audit was conducted and an energy policy was developed. The policy established general guidelines for the Energy-MAP. The plan was designed to be a working document to guide in the future development of specific objectives and strategies to address the problems of increasing demand for energy resources, rapidly increasing costs of energy resources, and potential shortages or inadequate supplies of energy available to the community. Energy-MAP is described. The internal components address primary government operations, including vehicle fleet operations, municipal buildings operations, employee programs, lighting energy management, and water services operations. The external components include a community education/communications design, a transportation efficiency plan, information on potential alternative energy resources development, and a preliminary draft energy element.

Not Available

1981-12-15T23:59:59.000Z

79

Categorical Exclusion Determination Form Proposed Action Title: (0472-1537) Northeastern University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37) Northeastern University - 37) Northeastern University - Multiscale Development of L 10 Materials for Rare-Earth-Free Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): New York, Michigan, Massachusetts, and Nebraska. Proposed Action Description: Funding will support the development of an ultra-strong ferromagnetic magnet material with a tetragonal L 10 structure, that does not contain rare earth materials and is designed for use in clean energy technologies such as electric vehicle motors and wind turbine generators. Northeastern University's application was selected for an initial 18-month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated

80

Categorical Exclusion Determination Form Proposed Action Title: (0472-1518) Case Western Reserve University -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18) Case Western Reserve University - 18) Case Western Reserve University - Transformation Enabled Nitride Magnets Absent Rare Earths Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Cleveland, OH Proposed Action Description: Funding will support the development of iron nitride (a"-Fe16(xx)N2) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Case Western Reserve University's application was selected for an initial 18- month period (Phase 1) of funding . The ARPA-E Program Director may decide to negotiate and fund project activities for an additional 18-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Categorical Exclusion Determination Form Proposed Action Title: (0472-1545) Dartmouth College -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45) Dartmouth College - 45) Dartmouth College - Nanocrystalline T-MnAI Permanent Magnets Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Hanover, NH Proposed Action Description: Funding will support the development of manganese-aluminum (T-MnAI) bulk powder capable of replacing rare earth elements in permanent magnets that are used in wind turbine generators and electric vehicle motors. Dartmouth College's application was selected for an initial 18- month period (Phase 1) of funding. The ARPA-E Program Director may decide to negotiate and fund project activities for an additional H3-month period (Phase II) after evaluating the work performed in Phase I. ARPA-E has not obligated funds or negotiated a scope of work for Phase II at

82

Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 2 Proposed Action and Alternatives  

NLE Websites -- All DOE Office Websites (Extended Search)

2-1 2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES Some types of experiments are best (or only) performed deep underground. For this reason, scientists have considered WIPP as a potential site for these types of experiments and have sought permission from DOE to conduct several types of experiments there. As an example, astrophysicists are searching for very small particles with no charge called neutrinos. These particles are so small that they typically pass through the Earth. The only way to detect them is to look for them using facilities as far underground as possible so that the Earth's surface layers filter out other cosmic particles and radiation. The first basic astrophysics-like experiments were begun at WIPP in 1993 by LANL scientists who used

83

UMTRA Surface Project management action process document: Final. Revision 2  

Science Conference Proceedings (OSTI)

Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

NONE

1996-06-01T23:59:59.000Z

84

M-area hazardous waste management facility groundwater monitoring and corrective-action report, First quarter 1995, Volume 1  

Science Conference Proceedings (OSTI)

This report, in three volumes, describes the ground water monitoring and c corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site (SRS) during the fourth quarter 1994 and first quarter 1995. Concise description of the program and considerable data documenting the monitoring and remedial activities are included in the document. This is Volume 1 covering the following topics: sampling and results; hydrogeologic assessment; water quality assessment; effectiveness of the corrective-action program; corrective-action system operation and performance; monitoring and corrective-action program assessment; proposed monitoring and corrective-action program modifications. Also included are the following appendicies: A-standards; B-flagging criteria; C-figures; D-monitoring results tables; E-data quality/usability assessment.

NONE

1995-05-01T23:59:59.000Z

85

Notice of Office of Management and Budget Action to Approve with...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants...

86

Notice of Office of Management and Budget Action to Approve with...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants Notice...

87

Daymet Follow-On Proposal: Data Management Plan R.B. Cook, M...  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Management Plan was part of the NASA ROSES 2012 Proposal Daymet Follow-On: Surface Weather Data with Uncertainty Quantification for Terrestrial Ecosystem Process Models...

88

Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 31 Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program, Los Alamos, New Mexico September 2, 2003 Department of Energy National Nuclear Security Administration Los Alamos Site Office Environmental Assessment for the Proposed LANL Trails Management Program DOE LASO September 2, 2003 iii Contents Acronyms and Terms................................................................................................................................vii Executive Summary ...................................................................................................................................ix 1.0 Purpose and Need ..............................................................................................................................1

89

Finding of no significant impact proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida  

SciTech Connect

The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-0976) of the proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida. The Northeast Site contains contaminated groundwater that would be removed, treated, and discharged to the Pinellas County Sewer System. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C.4321 et.seq. Therefore, the preparation of an environmental impact statement is not required and the DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1995-06-01T23:59:59.000Z

90

Federal Energy Management Program: Develop an Institutional Change Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change Continuous Improvement Cycle After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular measurement. Remember that planning useful efficiency and sustainability evaluation is necessary before an organization begins to implement an action plan.

91

DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposals for Management of New Mexico Waste Isolation Proposals for Management of New Mexico Waste Isolation Pilot Plant DOE Seeks Proposals for Management of New Mexico Waste Isolation Pilot Plant June 20, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati --The U.S. Department of Energy (DOE) today issued a Final Request for Proposal for management and operations of the Waste Isolation Pilot Plan (WIPP) located in Carlsbad, New Mexico. The successful contractor will manage the WIPP site and DOE's National Transuranic Waste (TRU) program. DOE anticipates awarding a competitive, cost-plus-award-fee contract with an approximate value of $135 million per year, for five years. There will be an option to extend the contract for five additional years. The overall mission of the WIPP and the National TRU program is to protect

92

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals Seeking a Contractor to Manage and Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility in Princeton, NJ. PPPL receives approximately $78 million annually from DOE. This is the first competition for a contractor in the history of the laboratory. The RFP describes the criteria DOE will use in selecting a successful future management and operating (M&O) contractor. Key criteria include:

93

Notice of Office of Management and Budget Action to Approve with Change the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a New Collection for OE a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change as an emergency action for six months the Information Collection Request (ICR) for a new collection (Request for a new OMB Control Number) for OE Recovery Act Financial Assistance Grants. Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance Grants More Documents & Publications Notice of Office of Management and Budget Action to Approve with Change the

94

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Request for Proposals Seeking a Contractor to Manage and DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National Accelerator Laboratory (Fermilab). Fermilab is a major DOE Office of Science single program research facility located on 6,800 acres approximately 45 miles west of Chicago, Illinois. "Fermilab is a world leader in high energy physics, which helps the U.S.

95

Notice of Office of Management and Budget Action to Approve with Change the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an Extension of the ICR an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension without Change of a Currently Approved Collection for OE Recovery Act Financial Assistance Grants Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial Assistance Grants More Documents & Publications Notice of Office of Management and Budget Action to Approve with Change the

96

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/26/2010 2/26/2010 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: Tom Pyke FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 12/22/2009 ACTION REQUESTED: New collection (Request for a new OMB Control Number) TYPE OF REVIEW REQUESTED: Emergency ICR REFERENCE NUMBER: 200912-1910-010 AGENCY ICR TRACKING NUMBER: Jaime Carlson-OE TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 08/31/2010 DISCONTINUE DATE:

97

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9/30/2010 9/30/2010 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: William Turnbull FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 07/23/2010 ACTION REQUESTED: Extension without change of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201005-1910-005 AGENCY ICR TRACKING NUMBER: Matthew Grosso TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 12/31/2011 DISCONTINUE DATE:

98

NOTICE OF OFFICE OF MANAGEMENT AND BUDGET ACTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1/10/2012 1/10/2012 Department of Energy Office of Administration FOR CERTIFYING OFFICIAL: William Turnbull FOR CLEARANCE OFFICER: Christina Rouleau In accordance with the Paperwork Reduction Act, OMB has taken action on your request received 10/13/2011 ACTION REQUESTED: Revision of a currently approved collection TYPE OF REVIEW REQUESTED: Regular ICR REFERENCE NUMBER: 201110-1910-001 AGENCY ICR TRACKING NUMBER: Matthew Grosso TITLE: OE Recovery Act Financial Assistance Grants LIST OF INFORMATION COLLECTIONS: See next page OMB ACTION: Approved with change OMB CONTROL NUMBER: 1910-5149 The agency is required to display the OMB Control Number and inform respondents of its legal significance in accordance with 5 CFR 1320.5(b). EXPIRATION DATE: 01/31/2015 DISCONTINUE DATE:

99

US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule  

Science Conference Proceedings (OSTI)

The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project, as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.

Not Available

1988-01-29T23:59:59.000Z

100

Strategies for Managing Liquid Effluents - Options, Actions, and Results  

Science Conference Proceedings (OSTI)

The challenge of balancing several factors, including public perception and site management goals, faces utility managers optimizing their radioactive liquid effluent programs. This document provides a standardized methodology for decision making when setting site effluent goals, and provides the tools needed to justify equipment or policy changes to utility and public stakeholders.

2003-11-24T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Proposal to negotiate the renewal of the contract for the licensing and maintenance of database management system software  

E-Print Network (OSTI)

Proposal to negotiate the renewal of the contract for the licensing and maintenance of database management system software

2008-01-01T23:59:59.000Z

102

Environmental Management Root Cause Analysis Corrective Action Plan Performance  

Energy.gov (U.S. Department of Energy (DOE))

As part of the Departments effort to build a strong project and contract management foundation,a Root Cause Analysis (RCA) was developed through extensive collaboration between DOE'sHeadquarters...

103

Notice of Proposed Floodplain and Wetlands Actions (DOE/EIS-0385) (03/28/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

398 Federal Register 398 Federal Register / Vol. 71, No. 59 / Tuesday, March 28, 2006 / Notices conditions that could result in an accidental or unauthorized detonation of nuclear explosives. Comments are invited on: (a) Whether the extended collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques

104

A model for determining when an analysis contains sufficient detail to provide adequate NEPA coverage for a proposed action  

SciTech Connect

Neither the National Environmental Policy Act (NEPA) nor its subsequent regulations provide substantive guidance for determining the Level of detail, discussion, and analysis that is sufficient to adequately cover a proposed action. Yet, decisionmakers are routinely confronted with the problem of making such determinations. Experience has shown that no two decisionmakers are Likely to completely agree on the amount of discussion that is sufficient to adequately cover a proposed action. one decisionmaker may determine that a certain Level of analysis is adequate, while another may conclude the exact opposite. Achieving a consensus within the agency and among the public can be problematic. Lacking definitive guidance, decisionmakers and critics alike may point to a universe of potential factors as the basis for defending their claim that an action is or is not adequately covered. Experience indicates that assertions are often based on ambiguous opinions that can be neither proved nor disproved. Lack of definitive guidance slows the decisionmaking process and can result in project delays. Furthermore, it can also Lead to inconsistencies in decisionmaking, inappropriate Levels of NEPA documentation, and increased risk of a project being challenged for inadequate coverage. A more systematic and less subjective approach for making such determinations is obviously needed. A paradigm for reducing the degree of subjectivity inherent in such decisions is presented in the following paper. The model is specifically designed to expedite the decisionmaking process by providing a systematic approach for making these determination. In many cases, agencies may find that using this model can reduce the analysis and size of NEPA documents.

Eccleston, C.H.

1994-11-01T23:59:59.000Z

105

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office of Science multi-program research facility located near Chicago, Illinois. "Argonne lab contributes expert scientists and unique leadership in basic research, which helps the U.S. maintain our global competitiveness," said Office of Science Director, Dr. Raymond L. Orbach. "Through this contracting process, DOE seeks the best possible management of this

106

Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1  

SciTech Connect

Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

Not Available

1994-12-01T23:59:59.000Z

107

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fermi National Accelerator Laboratory Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National Accelerator Laboratory (Fermilab). Fermilab is a major DOE Office of Science single program research facility located on 6,800 acres approximately 45 miles west of Chicago, Illinois. "Fermilab is a world leader in high energy physics, which helps the U.S. maintain global competitiveness," said Under Secretary for Science, Dr.

108

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

its Ames Laboratory its Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory June 29, 2006 - 2:48pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames Laboratory, a DOE Office of Science (SC) research facility in Ames, Iowa. This competition for a contractor is the first in the history of the laboratory. Ames is a laboratory that has been funded at approximately $30 million annually by the Office of Science, other government agencies, and private industry. "Ames Laboratory provides leadership in basic research across a broad spectrum of science, with great expertise in biology, chemistry, physics

109

Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan  

SciTech Connect

The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000.

CLARK, D.L.

1999-08-09T23:59:59.000Z

110

Surveillance Guide - MSS 1.1 Corrective Action/Issue Management and Continuous Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CORRECTIVE ACTION/ISSUE MANAGEMENT & CONTINUOUS IMPROVMENT CORRECTIVE ACTION/ISSUE MANAGEMENT & CONTINUOUS IMPROVMENT 1.0 Objective The objective of this surveillance is to verify that contractor personnel are effectively managing environment, safety, and health issues. The activities included in this surveillance help the Facility Representative determine whether safety issues identified through internal contractor, and external DOE or Defense Nuclear Facilities Safety Board evaluation programs are resolved consistent with the level of safety importance. It further verifies continuous improvement programs are in place and functional. 2.0 References 2.1 10 CFR 830.120, Quality Assurance Requirements 2.2 DOE O 414.1A, Quality Assurance 2.3 DOE O 232.1A, Occurrence Reporting and Processing of Operations Information

111

Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee  

SciTech Connect

The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

1996-08-01T23:59:59.000Z

112

Review of current Southern California edison load management programs and proposal for a new market-driven, mass-market, demand-response program  

Science Conference Proceedings (OSTI)

Utility load management programs, including direct load control and interruptible load programs, constitute a large installed base of controllable loads that are employed by utilities as system reliability resources. In response to energy supply shortfalls expected during the summer of 2001, the California Public Utilities Commission in spring 2001 authorized new utility load management programs as well as revisions to existing programs. This report provides an independent review of the designs of these new programs for a large utility (Southern California Edison) and suggests possible improvements to enhance the price responsiveness of the customer actions influenced by these programs. The report also proposes a new program to elicit a mass-market demand response to utility price signals.

Weller, G.H.

2002-01-01T23:59:59.000Z

113

UMTRA Surface Project management action process document. Final report: Revision 1  

Science Conference Proceedings (OSTI)

A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

NONE

1996-04-01T23:59:59.000Z

114

Financial and economic determinants of collective action: The case of wastewater management  

SciTech Connect

Where public environmental funds support development of wastewater infrastructure, funding institutions ensure the economic use of funds, while the beneficiaries minimize their own costs. In rural areas, there is often a choice between decentralized or centralized (multi-village) systems: if the centralized system is most economic, then only this system is eligible for public funding. However, its implementation requires a voluntary cooperation of the concerned communities, who need to organize themselves to develop and run the infrastructure. The paper analyzes the social determinants of collaboration in a generic case study, using the following variables: method of (economic) assessment, modeled by the social discount rate, funding policy, modeled by the funding rate, and users' self-organization, modeled by cost sharing. In a borderline situation, where the centralized system turns out to be most economic, but this assessment is contingent on the assessment method, collective action may fail: the advantages of collective action from funding are too small to outweigh organizational deficiencies. Considering in this situation sanitation as a human right, authors recommend using innovative forms of organization and, if these fail, reassessing either the amount of funding or the eligibility for funding of more acceptable alternatives. - Highlights: Black-Right-Pointing-Pointer A generic case study models collective action and funding in wastewater management. Black-Right-Pointing-Pointer Determinants of success: economic assessment, funding policy and self-organization. Black-Right-Pointing-Pointer Success indicators: conflict rate, funds needed to make cost shares fair. Black-Right-Pointing-Pointer Method for analyzing centralized vs. decentralized disputes. Black-Right-Pointing-Pointer If collective action has less benefits, innovative cost sharing may ensure success.

Brunner, Norbert, E-mail: norbert.brunner@cemds.org [Center for Environmental Management and Decision Support, Gregor Mendel Str. 33, A-1180 Vienna (Austria); Starkl, Markus, E-mail: markus.starkl@boku.ac.at [Competence Centre for Decision-Aid in Environmental Management, University of Natural Resources and Life Sciences/DIB, Gregor Mendel Strasse 33, 1180 Wien (Austria)

2012-01-15T23:59:59.000Z

115

Emergence of collective action and environmental networking in relation to radioactive waste management  

SciTech Connect

This paper explores the relationship between the national environmental movement and nuclear technology in relation to a local emergent group. The historical development of nuclear technology in this conutry has followed a path leading to continued fear and mistrust of waste management by a portion of the population. At the forefront of opposition to nuclear technology are people and groups endorsing environmental values. Because of the antinuclear attitudes of environmentalists and the value orientation of appropriate technologists in the national environmental movement, it seems appropriate for local groups to call on these national groups for assistance regarding nuclear-related issues. A case study is used to illustrate how a local action group, once integrated into a national environmental network, can become an effective, legitimate participant in social change. The formation, emergence, mobilization, and networking of a local group opposed to a specific federal radioactive waste management plan is described based on organizational literature. However, inherent contradictions in defining the local versus national benefits plus inherent problems within the environmental movement could be acting to limit the effectiveness of such networks. 49 refs.

Williams, R.G.; Payne, B.A.

1985-01-01T23:59:59.000Z

116

Corrective Action Plan for INEL low-level waste management ES&H vulnerabilities  

SciTech Connect

Low-level waste (LLW) activities at INEL include numerous waste generators, storage facilities, three treatment facilities, and one disposal facility. The Working Group Assessment Team (WGAT) conducted an assessment of the LLW management program in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-2 (Conformance with Safety Standards at Department of Energy Low-Level Nuclear Waste and Disposal Facilities). Assessment included review of waste generators, liquid effluent treatment, storage facilities and practices, and a disposal facility with vaults and a shallow subsurface burial site. WGAT reviewed relevant documents and conducted tours concerning these LLW operations. The vulnerabilities identified by WGAT were similar to those self-identified by INEL (storage and disposal of LLW). This assessment resulted in the documentation of 8 vulnerabilities and 3 conditions. WGAT assessed the overall LLW/mixed low-level waste (MLLW) management program at INEL as being generally effective. As recommended by DNFSB, a site-specific Corrective Action Plan has been prepared and constitutes the initial site improvement activities.

1996-07-01T23:59:59.000Z

117

(DOE/EIS-0265/SA-99): Supplement Analysis for the Watershed Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Watershed Management Program EIS, (DOEEIS-0265SA-99) Dorothy Welch (KEWU - 4) TO: Fish and Wildlife Project Manager, COTR Proposed Action: Longley Meadows Restoration Project...

118

HSS Finding D3 Corrective Action Plan for LBNL Integrated ES&H Management Inspection  

E-Print Network (OSTI)

. Deliverable to Close Corrective Action: OIIRR Program documents are aligned with, ORPS, IMP, and NTS programs

Knowles, David William

119

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

120

Records Management in the Formerly Used Sites Remedial Action Program (FUSRAP)  

Science Conference Proceedings (OSTI)

The U.S. Army Corps of Engineers' (USACE's) performance of site investigation and remediation under the Formerly Used Sites Remedial Action Program (FUSRAP) requires the use of a records management system in order to effectively capture and manage data, document the decision making process, and allow communication of project information to regulators, congress, and the public. The USACE faces many challenges in managing the vast amount of data, correspondence, and reports generated under this program, including: management of data and reports in a variety of paper, electronic, and microfilm formats; incorporation of records generated by the Department of Energy (DOE) prior to 1997; ensuring smooth flow of information among numerous internal Project Managers and regulators; and facilitating public access to information through the development of CERCLA Administrative Records and response to Freedom of Information Act (FOIA) requests. In 2004-2005, the USACE Buffalo District contracted with Dynamac Corporation to adapt the records management system developed for the Formerly Used Defense Sites (FUDS) Program to the records for the Luckey and Painesville FUSRAP sites. The system, known as the FUDS Information Improvement Plan (FIIP), was jointly developed by the USACE Hazardous, Toxic, and Radioactive Waste Center of Expertise (HTRW-CX), USACE Rock Island District, and several FUDS contractors (including Dynamac Corporation) in 2003. The primary components of the FIIP which address the challenges faced by the FUSRAP Program include: the development of a standardized document organization system; the standardization of electronic conversion processes; the standardization of file naming conventions; and the development of an automated data capture system to speed the process and reduce errors in indexing. The document organization system allows for the assignment of each individual document to one of approximately 150 categories. The categories are based upon a combination of the USACE site approval process and the CERCLA process. Documents are assigned to categories based on their relevance to the approval of the site, historical or reference content, and generation during a phase of the investigation and remediation process. Within each category relevant to a CERCLA phase, sub-categories exist to allow for the organization of correspondence, data, work plans, contracting information, technical reports, decision documents, and other associated documentation. The electronic conversion system was developed by USACE to standardize the types of electronic files maintained on the USACE Project Information Retrieval System (PIRS). Prior to standardization, PIRS had been populated with hundreds of thousands of electronic files of various incompatible types, making systematic search and retrieval impossible. By dictating the use of PDF files with standardized specifications, USACE ensured that all files were in the same format, and that the format is universally searchable and retrievable by probable users of the system. Similarly, the implementation of standardized file names, based on a combination of the site name, organization category, and a unique sequence number, facilitates linking of the individual files to indexing and search functions. To automate the entire process, Dynamac developed a Document Management Database, which was adapted to the FUSRAP Program for the Luckey and Painesville sites. Prior to the use of a database, capture of document titles, authors, dates, organization category, and other information was done manually, taking substantial time and leading to numerous errors. The database, developed in Microsoft Access format, facilitates the speed of the data entry and reduces errors by building drop-down menus during the data entry process. For instance, once an author and their affiliation are entered once, the name and affiliation can be retrieved by entering the beginning of the character string, or choosing the name from the drop-down list. For projects involving the management of tens of thousands of docum

Morekas, G.N.; Pape, M.B. [Dynamac Corporation, 2275 Research Boulevard, Suite 300, Rockville, MD 20850 (United States)

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

U.S. Department of Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Office of Legacy Management Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012 This report serves as an official record of the annual cost, personnel, and performance information for the Office of Legacy Management to satisfy the post competition accountability requirements. Reporting Period: Fiscal Years (FY) 2012 - 2016 FY2013 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability.* Annual   2. Publish Post Competition Accountability Report on the LM internet. Quarterly   3. Conduct independent evaluations of key programs, projects, or technical issues by goal

122

Proposed framework for the Western Area Power Administration Environmental Risk Management Program  

Science Conference Proceedings (OSTI)

The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J. [Pacific Northwest Lab., Richland, WA (United States); Roybal, A.L. [Western Area Power Administration, Golden, CO (United States)

1994-12-01T23:59:59.000Z

123

Request for Proposal Number DE-RP36-98GO10337 for the Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

7. 952.227-13 PATENT RIGHTS-ACQUISITION BY THE GOVERNMENT. (SEP 1997) AND 970.5204-72 PATENT RIGHTS-PROFIT MAKING MANAGEMENT AND OPERATING CONTRACTORS (FEB 1995) (a) Definitions....

124

Request for Proposal Number DE-RP36-98GO10337 for the Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

on or before August 1 of each year. The Contractor shall also provide DOE a 1-Year Plan describing its proposed institutional initiatives and goals for NREL considering all...

125

Data base management activities for the Remedial Action Program at Oak Ridge National Laboratories (ORNL)  

Science Conference Proceedings (OSTI)

The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations requiring comprehensive control over facility discharges and cleanup of contaminated sites. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current status of DIMS and its role in supporting RAP during 1989 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on the contents of the Numeric Data Base. Significant progress was made last year with the geographic information system (GIS) and ARC/INFO, which can be interfaced with SAS/GRAPH to provide combined mapping and statistical graphic products. Several thematic layers of GIS data for the Oak Ridge Reservation are now available. 18 refs., 8 figs., 19 tabs.

Hook, L.A.; Voorhees, L.D.; Gentry, M.J.; Faulkner, M.A.; Shaakir-Ali, J.A.; Newman, K.A.; McCord, R.A.; Goins, L.F.; Owen, P.T.

1990-07-01T23:59:59.000Z

126

Audit of Proposal to Acquire Land at the Fernald Environmental Management Project, ER-B-97-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Inspector General AUDIT OF PROPOSAL TO ACQUIRE LAND AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

127

Final Environmental Impact Statement for the Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement for the Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment DOE/EIS - 0440 Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management, Yuma Field Office U.S. Army Corps of Engineers U.S. Army Garrison Yuma Proving Ground Arizona Department of Environmental Quality Arizona Game and Fish Department December 2012 COVER SHEET Lead Federal Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of the Interior, Bureau of Land Management U.S. Army Corps of Engineers U.S. Army Garrison-Yuma Proving Ground Arizona Department of Environmental Quality

128

EMSL Research and Capability Development Proposals Facility-Wide Management and Storage for Scientific Data  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility-Wide Management and Storage for Scientific Data Facility-Wide Management and Storage for Scientific Data Project Start Date: Summer 2008 EMSL Lead Investigator Ken Auberry Instrumentation Development Laboratory, EMSL, PNNL As greater numbers of collaborators, journals, and funding agencies require data retention associated with a given project, preservation of experimentally generated results has become an increasingly important challenge in science. In many small- to medium-scale laboratory environments, this task has traditionally been carried out using offline optical media (recordable CDs and DVDs) or externally connected commercial hard drive units. Along with the raw storage issues that must be addressed, additional challenges await in the correlation of stored data to contextual information about the experiments and

129

Corrective action management unit application for the Environmental Restoration Disposal Facility  

Science Conference Proceedings (OSTI)

The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

Evans, G.C.

1994-06-01T23:59:59.000Z

130

GAO-05-123 Department of Energy: Further Actions Are Needed to Strengthen Contract Management for Major Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Committee on Government Committee on Government Reform, House of Representatives March 2005 DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects GAO-05-123 www.gao.gov/cgi-bin/getrpt? GAO-05-123. . To view the full product, including the scope and methodology, click on the link above. For more information, contact Robin Nazzaro at (202) 512-3841 or nazzaror@gao.gov. Highlights of GAO-05-123, a report to the Committee on Government Reform, House of Representatives March 2005 DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects The Department of Energy (DOE) pays its contractors billions of dollars each year to implement its major projects-those costing more than $400 million each. Many

131

Proposal to reduce greenhouse gas emissions via landfill gas management in Greater Buenos Aires, Argentina. Final report  

DOE Green Energy (OSTI)

The purpose of this project was to evaluate the feasibility of reducing the emission of greenhouse gases by collection, flaring, and possibly beneficially using the gas from landfills in Greater Buenos Aires, Argentina (GBA). Another purpose was to prepare a proposal to the US Initiative on Joint Implementation (USIJI) for a project to collect and possibly use the landfill gas (LFG). The project was carried out from September 30, 1997 through September 30, 1998. Collection and flaring of gas is feasible provided private firms have sufficient incentive to obtain greenhouse gas emission reduction benefits. The value of those benefits that would be required to motivate funding of an LFG management project was not explicitly determined. However, one independent power producer has expressed an interest in funding the first phase of the proposed project and paid for a detailed feasibility study which was conducted in August and September of 1998. As a result of this project, a proposal was submitted to the USIJI Evaluation Panel in June, 1998. In August, 1998, an office was established for reviewing and approving joint implementation proposals. The proposal is currently under review by that office.

Jones, D.B.

1998-10-01T23:59:59.000Z

132

Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal  

SciTech Connect

This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

Not Available

1994-01-01T23:59:59.000Z

133

M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities groundwater monitoring and corrective-action report (U). Third and fourth quarters 1996, Vol. I  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River Site (SRS) during 1996.

NONE

1997-03-01T23:59:59.000Z

134

MSS 1.1 Corrective Action/Issue Management 4/13/2000  

Energy.gov (U.S. Department of Energy (DOE))

The objective of this surveillance is to verify that contractor personnel are effectively managing environment, safety, and health issues. The activities included in this surveillance help the...

135

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60-DAY Federal Register Notice - Proposed 60-DAY Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the

136

Unsolicited Proposals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unsolicited Proposals Unsolicited Proposals Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real Estate Approvals Documents and Publications...

137

RCRA corrective action determination of no further action  

SciTech Connect

On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.

NONE

1996-06-01T23:59:59.000Z

138

F-Area Hazardous Waste Management Facility Semiannual Correction Action Report, Vol. I and II  

Science Conference Proceedings (OSTI)

The groundwater in the uppermost aquifer beneath the F-Area Hazardous Waste Management Facility (HWMF) at the Savannah River Site is routinely monitored for selected hazardous and radioactive constituents. This report presents the results of the required groundwater monitoring program.

Chase, J.

1999-11-18T23:59:59.000Z

139

Management Plan for Experimental Reintroduction of Sockeye into Skaha Lake; Proposed Implementation, Monitoring, and Evaluation, 2004 Technical Report.  

DOE Green Energy (OSTI)

Okanagan River sockeye salmon, which spawn near the town of Oliver, B.C., have their farther upstream migration limited by several water control and diversion dams. Stock numbers have been declining for many years and the Okanagan Native Alliance Fisheries Department (ONAFD) has been the principal advocate of a program to restore their numbers and range by reintroducing them into upstream waters where they may once have occurred in substantial numbers Some investigators have warned that without effective intervention Okanagan sockeye are at considerable risk of extinction. Among a host of threats, the quality of water in the single nursery areas in Osoyoos Lake. is deteriorating and a sanctuary such as that afforded in larger lakes higher in the system could be essential. Because the proposed reintroduction upstream has implications for other fish species, (particularly kokanee, the so-called ''landlocked sockeye'' which reside in many Okanagan lakes), the proponents undertook a three-year investigation, with funding from the Bonneville Power Administration and the Confederated Tribes of the Colville Reservation, to identify possible problem areas, and they committed to an interim experimental reintroduction to Skaha Lake where any problems could be worked out before a more ambitious reintroduction, (e.g. to Okanagan Lake) could be formally considered. The three-year investigation was completed in the spring of 2003. It included an assessment of risks from disease or the possible introduction of unwanted exotic species. It also considered the present quality and quantity of sockeye habitat, and opportunities for expanding or improving it. Finally ecological complexity encouraged the development of a life history model to examine interactions of sockeye with other fishes and their food organisms. While some problem areas were exposed in the course of these studies, they appeared to be manageable and the concept of an experimental reintroduction was largely supported but with the proviso that there should be a thorough evaluation and reporting of progress and results. A 2004 start on implementation and monitoring has now been proposed.

Wright, Howie; Smith, Howard (Okanagan Nation Alliance, Fisheries Department, Westbank, BC, Canada)

2004-01-01T23:59:59.000Z

140

Performance-Based Environmental Restoration Management Assessment (PERMA): Applying Decision Analysis to Implement Achievable Response-Action Completion Plans  

E-Print Network (OSTI)

Guide is being issued by the Defense Logistics Agency (DLA) to clarify the requirements for implementing the Defense Environmental Restoration Program (DERP) at DLA installations. This Guide reflects DLAs continuing commitment to demonstrate and achieve protectiveness and to meet necessary, feasible, and reasonable environmental response-action obligations in the most effective and efficient manner possible. This Performance-Based Environmental Restoration Management Assessment (PERMA) Guide is designed to assist DLA environmental project teams to achieve response complete in a reasonable timeframe, while maintaining protectiveness of human health and the environment. DLA issues this Guide also to clarify and stress the importance of remedy planning and optimization activities in establishing, reducing, and validating the annual environmental liability statement. The Guide reviews how to establish realistic and achievable performance objectives by taking advantage of the flexibility inherent in the DERP Guidance and the iterative nature of the cleanup program (i.e., fiveyear review process), as directed under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (as amended). Improving scientific and technical knowledge can and should be routinely integrated into the response-action planning and implementation process to ensure that the best responses are used to feasibly and reasonably achieve and efficiently sustain necessary protection.

unknown authors

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Record of Decision for Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Federal Register / Vol. 60, No. 4 / Friday, January 6, 1995 / Notices research and advanced concepts pertinent to fossil resource conversion and utilization limited to the nine (9) technical topics listed below. Topic 1-Advanced Environmental Control Technology for Coal Grant applications in support of Advanced Environmental Control Technology for Coal are only solicited for the following subtopics: Coal Preparation Hot Gas Stream Cleanup Advanced High Efficiency Emissions Control Waste Management Topic 2-Advanced Coal Utilization Grant applications in support of Advanced Coal Utilization are only solicited for the following subtopics: Advanced Coal Combustion Systems Fluid Bed Combustion (FBC) Topic 3-Coal Liquefaction Technology Grant applications in support of Coal Liquefaction Technology are only

142

Quantifying And Managing The Influence Of Maintenance Actions On The Survivability Of Mesh-Restorable Networks  

E-Print Network (OSTI)

of "roll to protection" in rings. The basic methods can be adapted for other maintenance models or models of the restoration process or adapted to handle multiple maintenance scenarios. The work is aimed at understanding and managing the effects of maintenance in a mesh-restorable network and ultimately providing new operational and design capabilities for future mesh-based network planning and operations systems. I. Motivation and Background One of the motivations for mesh-restorable networking is the greater capacity efficiency of mesh networks relative to ring-based transport networks. The capacity efficiency comes from the more direct routing of working paths, the need for less spare capacity for restoration, and the avoidance of "stranded capacity" effects in rings where one or more ring spans may exhaust while other spans of the ring have valuable but unusable remaining working capacity. Of course capacity efficiency is not the only consideration in a choice of n

Wayne D. Grover; Matthieu Clouqueur; Thuthuy Bach

2001-01-01T23:59:59.000Z

143

Basis for a Waste Management Public Communication Policy: Actual Situation Analysis and Implementation of Corrective Actions  

SciTech Connect

Argentina will require new sites for the location of radioactive waste final disposal systems. It is currently mandatory to have social and political consensus to obtain the corresponding agreements. The experience obtained with the cancellation of the project ''Feasibility Study and Engineering Project--Repository for High Level Radioactive Waste'', reinforces even more the necessity to count with the acceptance of the public to carry out projects of this kind. The first phase of the former was developed in the 80's: geological, geophysical and hydrogeological studies were performed in a compact granitic rock located in Sierra del Medio, Chubut province. This project had to be called off in the early 90's due to strong social rejection. This decision was closely related to the poor attention given to social communication issues. The governmental decision-makers in charge underwent a lot of pressure from social groups claiming for the cancellation of the project due to the lack of information and the fear it triggered. Thus, the lesson learnt: ''social communication activities must be carefully undertaken in order to achieve the appropriate management of the radioactive waste produced in our country.'' The same as in other countries, the specific National Law demands the formulation of a Strategic Plan which will not only include the research into radioactive waste, but the design of a Social Communication Programme as well. The latter will be in charge of informing the population clearly and objectively about the latest scientific and technological advances in the issue. A tentative perception-attitude pattern of the Argentine society about the overall nuclear issue is outlined in this paper. It is meant to contribute to the understanding of the public's adverse reaction to this kind of project. A communication programme is also presented. Its objective is to install the waste management topic in the public's opinion with a positive real outlook.

Jolivet, L. A.; Maset, E. R.

2002-02-28T23:59:59.000Z

144

Basis for a Waste Management Public Communication Policy: Actual Situation Analysis and Implementation of Corrective Actions  

SciTech Connect

Argentina will require new sites for the location of radioactive waste final disposal systems. It is currently mandatory to have social and political consensus to obtain the corresponding agreements. The experience obtained with the cancellation of the project ''Feasibility Study and Engineering Project--Repository for High Level Radioactive Waste'', reinforces even more the necessity to count with the acceptance of the public to carry out projects of this kind. The first phase of the former was developed in the 80's: geological, geophysical and hydrogeological studies were performed in a compact granitic rock located in Sierra del Medio, Chubut province. This project had to be called off in the early 90's due to strong social rejection. This decision was closely related to the poor attention given to social communication issues. The governmental decision-makers in charge underwent a lot of pressure from social groups claiming for the cancellation of the project due to the lack of information and the fear it triggered. Thus, the lesson learnt: ''social communication activities must be carefully undertaken in order to achieve the appropriate management of the radioactive waste produced in our country.'' The same as in other countries, the specific National Law demands the formulation of a Strategic Plan which will not only include the research into radioactive waste, but the design of a Social Communication Programme as well. The latter will be in charge of informing the population clearly and objectively about the latest scientific and technological advances in the issue. A tentative perception-attitude pattern of the Argentine society about the overall nuclear issue is outlined in this paper. It is meant to contribute to the understanding of the public's adverse reaction to this kind of project. A communication programme is also presented. Its objective is to install the waste management topic in the public's opinion with a positive real outlook.

Jolivet, L. A.; Maset, E. R.

2002-02-28T23:59:59.000Z

145

Action Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

146

Management Alert - The 2020 Vision One System Proposal for Commissioning and Startup of the Waste Treatment and Immobilization Plant, IG-0871  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The 2020 Vision One System Proposal The 2020 Vision One System Proposal for Commissioning and Startup of the Waste Treatment and Immobilization Plant DOE/IG-0871 October 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 October 3, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Management Alert on "The 2020 Vision One System Proposal for Commissioning and Startup of the Waste Treatment and Immobilization Plant" IMMEDIATE CONCERN The Department of Energy is considering a proposal known at the 2020 Vision One System (2020 Vision) that would implement a phased approach to commissioning the $12.2 billion Waste Treatment and Immobilization Plant (WTP). As part of the phased approach, the Low-

147

60-DAY Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of

148

EA-1855: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan (MAP) is part of the Finding of No Significant Impact for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves...

149

Los Alamos Scientific Laboratory energy-related history, research, managerial reorganization proposals, actions taken, and results. History report, 1945--1979  

DOE Green Energy (OSTI)

This report documents the development of major energy-related programs at the Los Alamos Scientific Laboratory between 1945 and 1979. Although the Laboratory`s primary mission during that era was the design and development of nuclear weapons and most of the Laboratory`s funding came from a single source, a number of factors were at work that led to the development of these other programs. Some of those factors were affected by the Laboratory`s internal management structure and organization; others were the result of increasing environmental awareness within the general population and the political consequences of that awareness; still others were related to the increasing demand for energy and the increasing turmoil in the energy-rich Middle East. This report also describes the various activities in Los Alamos, in Washington, and in other areas of the world that contributed to the development of major energy-related programs at Los Alamos. The author has a unique historical perspective because of his involvement as a scientist and manager at the Los Alamos Scientific Laboratory during the time period described within the report. In addition, in numerous footnotes and references, he cites a large body of documents that include the opinions and perspectives of many others who were involved at one time or another in these programs. Finally the report includes a detailed chronology of geopolitical events that led to the development of energy-related programs at Los Alamos.

Hammel, E.F.

1997-03-01T23:59:59.000Z

150

M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwate Monitoring and Corrective-Action Report, First and Second Quarters 1998, Volumes I, II, & III  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah river Site (SRS) during first and second quarters 1998. This program is required by South Carolina Hazardous Waste Permit SC1-890-008-989 and Section 264.100(g) of the South Carolina Hazardous Waste Management Regulations. Report requirements are described in the 1995 RCRA Renewal Permit, effective October 5, 1995, Section IIIB.H.11.b for the M-Area HWMF and Section IIIG.H.11.b for the Met Lab HWMF.

Chase, J.

1998-10-30T23:59:59.000Z

151

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

152

30-Day Federal Register Notice - Proposed  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that highlights the major questions being asked; suggested length is 2 to 5 sentences}. DATES: Comments regarding this collection must be received on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. If you anticipate that you will be submitting comments, but find it difficult

153

Implementation Proposal for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

154

Categorical Exclusion Determination Form Proposed Action Title...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

54) Varentec Inc. - Compact Dynamic Phase Angle Regulators for Transmission Power Routing Program or Field Office: Advanced Research Projects Agency - Energy Location(s) (City...

155

Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Process R&D Overview 100G Testbed Testbed Description Testbed Results Current Testbed Research Proposal Process Terms and Conditions Virtual Circuits (OSCARS) Performance...

156

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management...

157

BS.l Actions to Conserve Energy-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BS.l Actions to Conserve Energy- BS.l Actions to Conserve Energy- Revision 0 Sitewide Categorical Exclusion for Actions to Conserve Energy Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office L11tegrated Management System Procedure, NEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

158

Adaptation Strategies in Policy-Driven Autonomic Management  

Science Conference Proceedings (OSTI)

Policies have been proposed as a means to express required or desired behavior of systems and applications. Policies can be used within the autonomic management elements of the system to provide action directives to adjust application or system tuning ...

Raphael M. Bahati; Michael A. Bauer; Elvis M. Vieira

2007-06-01T23:59:59.000Z

159

INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT  

SciTech Connect

The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

2011-05-31T23:59:59.000Z

160

Enforcement Action - EA-2005-07  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

your response to the PNOV, including your proposed corrective actions entered into the NTS, DOE will determine whether further enforcement action is necessary to ensure...

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ENERGY STAR Congregations Energy Stewardship Action List |...  

NLE Websites -- All DOE Office Websites (Extended Search)

Congregations Energy Stewardship Action List Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new...

162

Identify energy-saving actions | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Identify energy-saving actions Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction...

163

F-Area Hazardous Waste Management Facility Correction Action Report, Third and Fourth Quarter 1998, Volumes I and II  

Science Conference Proceedings (OSTI)

The groundwater in the uppermost aquifer beneath the F-Area Hazardous Waste Management Facility (HWMF), also known as the F-Area Seepage Basins, at the Savannah Site (SRS) is monitored periodically for selected hazardous and radioactive constituents. This report presents the results of the required groundwater monitoring program.

Chase, J.

1999-04-23T23:59:59.000Z

164

Oak Ridge K-25 Site Technology Logic Diagram. Volume 3, Technology evaluation data sheets; Part B, Remedial action, robotics/automation, waste management  

SciTech Connect

The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration (ER) and waste management (WN) problems at the Oak Ridge K-25 Site. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remediation, decontamination, and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume 3 B provides the Technology Evaluation Data Sheets (TEDS) for ER/WM activities (Remedial Action Robotics and Automation, Waste Management) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than each technology in Vol. 2. The TEDS are arranged alphanumerically by the TEDS code number in the upper right corner of each data sheet. Volume 3 can be used in two ways: (1) technologies that are identified from Vol. 2 can be referenced directly in Vol. 3 by using the TEDS codes, and (2) technologies and general technology areas (alternatives) can be located in the index in the front of this volume.

Fellows, R.L. [ed.

1993-02-26T23:59:59.000Z

165

Proposal Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Deadline: June 30, 2008 Funding LLNL supports projects with funding from University of California. Funding for the IGPP Minigrant projects is limited to 50,000 per...

166

Data management implementation plan for interim action at the Gunite and Associated Tanks, Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The Gunite and Associated Tanks (GAAT) Project is currently conducting a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interim Remedial Action to reduce uncertainties on the potential cost and effectiveness of remote tank cleaning equipment being produced jointly between the US Department of Energy (DOE); Oak Ridge National Laboratory (ORNL); Lockheed Martin Energy Systems, Inc.; and associated subcontractors with the DOE EM-50 Program. The goal of this document is to ensure that all procedures have been followed to provide reliable, verifiable data that are technically defensible. The data collected will be used to support closure of the tanks, compare the expected versus actual waste volume and curies to aid in conducting operations, and verify the performance of developmental equipment.

1998-03-01T23:59:59.000Z

167

EA-1755: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1755: Mitigation Action Plan Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico EA prepared for the proposed reconstruction of the Waste Isolation Pilot Plant (WIPP) South Access Road (County Road 802) located in Eddy County, New Mexico. Through the environmental review process, the Bureau of Land Management Carlsbad Field Office (BLM CFO) determined that there would be potential environmental impacts from the proposed project that would require mitigation to assure that the impacts would not become significant. Therefore, the Department of Energy Carlsbad Field Office (CBFO) prepared this Mitigation Action Plan (MAP) to establish conditions for issuing its

168

U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.).  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COALITION, COALITION, INFORMATION NETWORK FOR RESPONSIBLE MINING, CENTER FOR NATIVE ECOSYSTEMS, CENTER FOR BIOLOGICAL DIVERSITY, and SHEEP MOUNTAIN ALLIANCE, Plaintiffs, v. OFFICE OF LEGACY MANAGEMENT, and UNITED STATES DEPARTMENT OF ENERGY, Defendants. ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS' MOTION FOR RECONSIDERATION This matter is before the Court on Defendants' Motion to Reopen and for Reconsideration of October 18, 2011 Order. (ECF No. 95.) Plaintiffs have filed a Response to the Motion (ECF No. 100), and Defendants have filed a Reply (ECF No. 101). The Court hereby REOPENS this action for the limited purpose of ruling on Defendants' Motion for Reconsideration. See D.C.COLO.LCivR 41.2. Having carefully considered the arguments presented, Defendants' Motion for Reconsideration is

169

Conceptual Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

-1-08 submitted to Energy Engineering -1-08 submitted to Energy Engineering Action-Oriented Benchmarking: Using the CEUS Database to Benchmark Commercial Buildings in California Paul Mathew & Evan Mills, Lawrence Berkeley National Laboratory Norman Bourassa & Martha Brook, California Energy Commission ABSTRACT The 2006 Commercial End Use Survey (CEUS) database developed by the California Energy Commission is a far richer source of energy end-use data for non-residential buildings than has previously been available and opens the possibility of creating new and more powerful energy benchmarking processes and tools. In this article - Part 2 of a two-part series - we describe the methodology and selected results from an action-oriented benchmarking approach using the new

170

Corrective and Preventive Action  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 8 Corrective/Preventive Action Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Corrective/Preventive Action Process Document Number: P-008 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): P-004 Business System Management Review, F-017 Corrective Action Report Planning Worksheet or F-018 Preventive Action Report Planning Worksheet P-008 Corrective/Preventive Action Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change A Initial Release 08_0310 Implemented Multiple reviewer of "Root Cause" into process. 08_0313 Changed verbiage in Process, Responsibility and Definitions for clarification. Assigned new Backup Document Owner.

171

Nevada test site underground storage tank number 12-13-1: Nevada division of emergency management case number H931130E corrective action unit 450. Closure report  

Science Conference Proceedings (OSTI)

The project site was identified as an abandoned Underground Storage Tank (UST) to be closed under the Department of Energy/Nevada Operations Office (DOE/NV) Environmental Restoration Division (ERD) Program during Fiscal Year 1993. The United States Environmental Protection Agency (EPA) requires that before permanent closure is completed an assessment of the site must take place. The Nevada Division of Environmental Protection (NDEP) requires assessment and corrective actions for a petroleum substance in the soil which exceeds 100 milligrams per kilogram (mg/kg). Subsequent to the tank removal, a hydrocarbon release was identified at the site. The release was reported to the NDEP by DOE/NV on November 30, 1993. Nevada Division of Environmental Management (NDEM) Case Number H931130E was assigned. This final closure report documents the assessment and corrective actions taken for the hydrocarbon release identified at the site. The Notification of Closure, EPA Form 7530-1 dated March 22, 1994, is provided in Appendix A. A 45-day report documenting the notification for a hydrocarbon release was submitted to NDEP on April 6, 1994.

NONE

1997-01-01T23:59:59.000Z

172

Unsolicited Proposals  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy's (DOEs) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas.

173

Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee  

SciTech Connect

The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge.

1996-08-01T23:59:59.000Z

174

3Q/4Q00 Annual M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwater Monitoring and Corrective-Action Report - Third and Fourth Quarters 2000 - Volumes I, II, and II  

Science Conference Proceedings (OSTI)

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River Site (SRS) during 2000. This program is required by South Carolina Resource Conservation and Recovery Act (RCRA) Hazardous Waste Permit SC1890008989 and Section 264.100(g) of the South Carolina Hazardous Waste Management Regulations.

Cole, C.M. Sr.

2001-04-17T23:59:59.000Z

175

1Q/2Q00 M-Area and Metallurgical Laboratory Hazardous Waste Management Facilities Groundwater Monitoring and Corrective-Action Report - First and Second Quarters 2000 - Volumes I, II, and II  

SciTech Connect

This report describes the groundwater monitoring and corrective-action program at the M-Area Hazardous Waste Management Facility (HWMF) and the Metallurgical Laboratory (Met Lab) HWMF at the Savannah River site (SRS) during first and second quarters of 2000.

Chase, J.

2000-10-24T23:59:59.000Z

176

EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Proposed Changes to Parcel ED-1 Land Uses, Utility 6: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee SUMMARY NOTE: This EA has been cancelled. This EA will evaluate the environmental impacts of DOE's proposed modifications to the allowable land uses, utility infrastructure, and Natural Area management responsibility for Parcel ED-1. The purpose of the modifications is to enhance the development potential of the Horizon Center business/industrial park, while ensuring protection of the adjacent Natural Area. The area addressed by the proposed action was evaluated for various industrial/business uses in the

177

Review of current Southern California edison load management programs and proposal for a new market-driven, mass-market, demand-response program  

E-Print Network (OSTI)

of the Southern California Edison company. Table of Contentsfor Southern California Edison. LBNL-52408. Appendix A.Current Southern California Edison Load Management Programs

Weller, G.H.

2002-01-01T23:59:59.000Z

178

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21813 21813 Vol. 76, No. 75 Tuesday, April 19, 2011 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket Number: EERE-2010-BT-CE-0014] RIN 1904-AC23 Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Proposed rule. SUMMARY: The U.S. Department of Energy (DOE or the ''Department'') proposes to amend the compliance dates for revisions to its certification, compliance, and enforcement regulations for certain commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the ''Act''). Specifically, DOE is tentatively proposing an 18-month extension to the

179

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

180

Standards Actions, May 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30-2001 30-2001 Activity Summary In Conversion - 4 In Preparation - 39 Out for Comment - 19 Published this Month - 0 5-year Review Status Revision in Progress - 4 Reaffirmation in Progress - 23 Cancellation Pending - 9 Cancellation in Progress - 18 No Current Action - 12 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Proposed for Reaffirmation 1 Proposed Cancellation of DOE Technical Standards 2 Published DOE Technical Standards 3 American National Standards Institute 3 American National Standards 6 American Society for Testing and Materials 6 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. May 2001 Standards Actions DOE Technical Standards Projects Initiated

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Draft final feasibility study report and proposed plan for Operable Unit 4, response to comments: Fernald Environmental Management Project, Fernald, Ohio  

SciTech Connect

This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.

Not Available

1994-02-01T23:59:59.000Z

182

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

183

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

184

DOE/EIS-0265-SA-165: Supplement Analysis for the Watershed Management Program EIS (8/4/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-165) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-165) Mickey Carter TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 4.12 Filter Strips, 6.1 Differed Grazing, 6.10 Access Fencing Location: Custer County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

185

Standards Actions, May 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-29-2002 4-29-2002 Activity Summary In Conversion - 4 In Preparation - 47 Out for Comment - 12 Published this Month - 6 5-year Review Status Revision in Progress - 10 Reaffirmation in Progress - 12 Supersedure in Progress - 0 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 20 Inside this issue: DOE Technical Standards Proposed for Reaffirmation 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- May 2002 Standards Actions DOE Technical Standards Proposed for Reaffirmation The following documents are currently being reevaluated under the 5-year

186

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 12, 2001 July 12, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57) Allyn Meuleman - KEWU Fish and Wildlife Project Manager Proposed Action: Idaho Fish Screening Improvement (Champion, Iron, Fourth of July, Goat Creeks) Project No: 1994-015-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish passage enhancement - fishways; 4.25 Consolidate/Replace irrigation diversion dams; 4.10 Water Conveyance: pipeline. Location: Stanley, Custer County, Idaho. Proposed by: Bonneville Power Administration (BPA) and the Idaho Department of Fish and Game. Description of the Proposed Action: BPA proposes to fund a project that will enhance in-stream

187

Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2004 14, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38) Joe DeHerrera Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Proposed Weaver Slough Conservation Easement Project No: 2002-042 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS [page A/2]): 1.2 Easement Acquisition Location: Flathead River System, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Flathead Land Trust Description of the Proposed Action: BPA proposes to purchase the conservation easements on the Sanders (307 acres) and Seabaugh (449 acres) parcels of the Weaver Slough to ensure that

188

Final voluntary release assessment/corrective action report  

SciTech Connect

The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

NONE

1996-11-12T23:59:59.000Z

189

Eleventh annual Department of Energy low-level waste management conference. Volume 1: Regulatory updates, performance assessment, understanding remedial action efforts  

SciTech Connect

Eighteen papers are presented in this volume. The section on regulatory updates present papers on EPA, NRC, and DOE regulations. The performance assessment section presents studies on disposal facilities at ORNL, Hanford, and the Feed Materials Production Center. The remedial action section papers discuss programs and remedial action activities. Papers have been processed separately for inclusion on the data base.

1989-11-01T23:59:59.000Z

190

Integrating Management Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Mission Execution by Mission Execution by Integrating our Management Systems Integrating our Management Systems 1 W e e k l y O p e r a t i o n s M e e t i n g N o v e m b e r 1 , 2 0 1 1 M i c h a e l J . W e i s Pulling the Pieces Together for Improving DOE Management to Enable Mission Execution 2  Process changes Process changes  Behavioral changes Behavioral changes  System changes System changes Process Change Approach Strengthening and Expediting Decision Making 3 Proposed Outcomes Horizontal Integration Incoming DOE Business Crosscutting Issues (i.e. NLDC input) Hi-level Roadblocks Operations Management Council Associate Deputy Secretary Collaborative Action Process Chief Operating Officer Weekly Operations Council (OMC) Super 8 Secretary (ADS) (CAP) Board (COOB) p Meeting Endorsement / Commitment Super 8 US Meetings COO Meetings

191

l lI ACTION PLAN FOR PERFORMANCE BASED SEISMIC ...  

Science Conference Proceedings (OSTI)

Page 1. FEDERAL EMERGENCY MdANAGEVENT AGENCY FEDERAL EMERGENCY MANAGEMENT AGENCY gl llI ACTION PLAN a FOR ...

2007-03-01T23:59:59.000Z

192

Proposed Rules DEPARTMENT OF ENERGY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 76, No. 1 / Monday, January 3, 2011 / Proposed Rules DEPARTMENT OF ENERGY [Docket ID: DOE-HQ-2010-0002] 10 CFR Part 1021 RIN 1990-AA34 National Environmental Policy Act Implementing Procedures AGENCY: Office of the General Counsel, U.S. Department of Energy. ACTION: Notice of proposed rulemaking and public hearing. SUMMARY: The U.S. Department of Energy (DOE or the Department) proposes to amend its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The majority of the changes are proposed for the categorical exclusions provisions contained in its NEPA Implementing Procedures, with a small number of related changes proposed for other provisions. These proposed changes are intended to better align the

193

Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4  

SciTech Connect

This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

A. M. Tyson

2006-08-01T23:59:59.000Z

194

DOE/EIS-0265-SA-169: Supplement Analysis for the Watershed Management Program EIS --Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing (08/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Mickey Carter Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 2.15 Acquisition of Sensitive Riparian Resources, 6.10 Access Fencing Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the installation of a fenced stream crossing over the Pahsimeroi River to enhance a livestock riparian exclosure.

195

(DOE/EIS-0265/SA-101): Supplement Analysis for the Watershed Management EIS 1/2/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2003 , 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-101) Mark Shaw, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Restoration of Anadromous Fish Access to Hawley Creek Project No: 2001-052-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.18: Purchase / Negotiate Water Right Location: Lemhi, Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Lemhi Soil and Water Conservation District, with the cooperation of the Idaho Governor's Office of Species Conservation. Description of the Proposed Action: BPA proposes to fund a project to enhance fish habitat on

196

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-78) (5/9/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 9, 2002 May 9, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-78) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II (modification to DOE/EIS-0265/SA-72). Project No: 1997-051-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase approximately 310 acres of privately-owned

197

December 2006 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2006 December 2006 TSP Manager's Notes 1 Meeting In The Middle 2 Plain Talk for a New Generation 3 Licensing New Nuclear Power Plants 4 ANSI Government Affairs Overview 5 Technical Standards Manager Spotlight 7 Topical Committee Developments 8 Welcome Aboard the TSMC! 8 Standards Actions 9 DOE Standards Actions 9

198

March 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2007 March 2007 Continued on next page TSP Manager's Notes 1 Domestic Programs (American National Standards) Overview 2 Aerospace Industry Advocates Standards Selection Based on Technical Merit, Not Semantics 3 Report Recommends Withdrawal of OMB Risk Assessment Bulletin 4 Technical Standards Manager Spotlight 5 Topical Committee Developments 6 Welcome Aboard the TSMC! 7 Standards Actions 8 DOE Standards Actions 8

199

Action Codes Table | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Action Codes Table | National Nuclear Security Administration Action Codes Table | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Action Codes Table Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > NMMSS Information, Reports & Forms > Code Tables > Action Codes Table

200

Mitigation Action Plan  

Science Conference Proceedings (OSTI)

This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

Not Available

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS (DOE/EIS-0246/SA-17) Supplement Analysis for the Wildlife Management Program EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 13, 2001 September 13, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17) Joe HeHerrera - KEWU Fish and Wildlife Project Manager Proposed Action: Eagle Lakes Ranch Acquisition and Restoration Project No: 2000-025-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee-Title Acquisition Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service (USFWS), Columbia National Wildlife Refuge Description of the Proposed Action: BPA proposes to partially fund the acquisition of 7,630 acres

202

February 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards Program Document Status 1-18-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 10 Published in January - 3 5-year Review Status Proposed for Revision-6 Revision in Progress-4 Proposed for Reaffirmation-3 Reaffirmation in Progress-21 Cancellation Pending-16 Cancellation in Progress-0 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/ February 2005 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://tis.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

203

July 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical DOE Technical Standards Program Document Status 06-28-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 14 Published in June - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ July 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose Projects,

204

May 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-25-2008 4-25-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in April - 2 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ May 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

205

April 2008 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-27-2008 3-27-2008 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 26 Published in March - 0 Five Year Review status Proposed for Revision-4 Revision in Progress-3 Proposed for Reaffirmation-0 Reaffirmation in Progress-20 Cancellations Pending-6 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.hss.energy.gov/nuclear safety/techstds/ April 2008 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

206

July 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-27-2007 6-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed forReaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://hss.energy.gov/nuclear safetytechstds/ July 2007 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://hss.energy.gov/nuclear safetytechstds/. To access these standards, go to our web page, click on "DOE Technical Standards," then choose

207

October 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publication Staff Roster 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-26-2006 Activity Summary In Conversion - 4 In Preparation - 24 Out for Comment - 16 Published in September - 1 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at http://www.eh.doe.gov/ techstds/ October 2006 Standards Actions 1.0 DOE Standards Actions The complete list of all DOE Technical Standards projects and their status is available on the Technical Standards Program (TSP) web page at http://www.eh.doe.gov/techstds/. To access

208

November 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 10-25-2006 Activity Summary In Conversion - 4 In Preparation - 23 Out for Comment - 16 Published in September - 0 5-year Review Status Proposed for Revision-5 Revision in Progress-6

209

April 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 1 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 3-28-2005 Activity Summary In Conversion - 4 In Preparation - 25 Out for Comment - 11 Published in March - 0 5-year Review Status Proposed for Revision-6 Revisions in Progress-4 Proposed for Reaffirmation-3 Reaffirmations in Progress-24 Cancellations Pending-11 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards

210

August 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 07-26-2006 Activity Summary In Conversion - 4 In Preparation - 22 Out for Comment - 16 Published in July - 2 5-year Review Status Proposed for Revision-5 Revision in Progress-6 Proposed for reaffirmation-1 Reaffirmation in Progress-21 Cancellation Pending-9 Cancellation in Progress-0

211

August 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 07-27-2007 Activity Summary In Conversion - 4 In Preparation - 27 Out for Comment - 24 Published in June - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

212

October 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 09-27-2007 Activity Summary In Conversion - 4 In Preparation - 26 Out for Comment - 27 Published in September - 0 5-year Review status Proposed for Revision-5 Revision in Progress-6 Proposed for Reaffirmation-1 Reaffirmation in Progress-21 Cancellations Pending-9 Cancellations in Progress-0 Inside This Issue Visit the Technical Standards Program Web Site at

213

Request for Proposals Number RHB-3-23115  

NLE Websites -- All DOE Office Websites (Extended Search)

9 National Renewable Energy Laboratory Managed and Operated by the Alliance for Sustainable Energy, LLC Request for Proposals Number RHB-3-23115 "Construction Project Management...

214

The Standards Forum and Standards Actions - June 2001 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 The Standards Forum and Standards Actions - June 2001 Inside this issue: Should DOE Organizations Include DOE O 252.1 in their Contracts?....................................................... 1 Metrology/Accreditation Personnel and Nuclear Weapons Complex Managers Take Action Addressing Current Issues at Joint Annual Meeting........................................................................ 1 A Note from the Manager........................................................................................................................ 2 Welcome Aboard the TSMC!..................................................................................................................

215

Formerly Utilized MED/AEC Sites Remedial Action Program. Project management plan for the decontamination of Jones Laboratory, Ryerson Physical Laboratory, and Eckhart Hall, the University of Chicago, Chicago, Illinois  

SciTech Connect

The Department of Energy (DOE) has in place a plan for the decontamination and decommissioning of contaminated sites that had been formerly utilized by the Manhattan Engineering District (MED) and/or the Atomic Energy Commission. This plan is referred to as the Formerly Utilized Sites Remedial Action Program (FUSRAP). Among these sites are Jones Laboratory, Ryerson Physical Laboratory and Eckhart Hall of The University of Chicago at Chicago, Illinois. This document represents the Project Management Plan for the decontamination of these facilities. 13 references, 3 figures, 1 table.

Flynn, K.F.; Smith, W.H.; Wynveen, R.A.

1984-01-01T23:59:59.000Z

216

Office of Legacy Management Categorical Exclusion Determination Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Office of Legacy Management Categorical Exclusion Determination Form Prog ram or Field Office: Office of Legacy Management Proj ect Tit le and 1.0. No.: Routine Maintenance Activities at the Grand Junction Regional Airport, Colorado, Calibration Model Facility. LM # 44 -11. Location: Grand Junction, Colorado Proposed Action or Proj ect Description: DO E proposes to conduct routine maintenance actions as needed at a facility containing five concrete calibration pads. The facility is located at the Grand Junction Regional Airport on property leased from the Airport Authority. Renewal of the lease generally takes place every 5 years with the next renewal anticipated in 2013. Routine maintenance actions might include site inspections and vehicle vacuum sweeping of the pads. The small amount

217

EA-1728: Integrated Vegetation Management on the Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28: Integrated Vegetation Management on the Hanford Site, 28: Integrated Vegetation Management on the Hanford Site, Richland, Washington EA-1728: Integrated Vegetation Management on the Hanford Site, Richland, Washington Summary This EA evaluates the environmental impacts from vegetation management in the "project area" of the Hanford Site. The project area excludes most of the Hanford Reach National Monument that is managed by the U.S. Fish and Wildlife Service (USFWS) under permit from DOE. Vegetation managment under the EA would be consistent with and complement similar efforts currently being performed by the USFWS on the Monument. Based on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of NEPA, and that preparation of

218

EA-1728: Integrated Vegetation Management on the Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728: Integrated Vegetation Management on the Hanford Site, 728: Integrated Vegetation Management on the Hanford Site, Richland, Washington EA-1728: Integrated Vegetation Management on the Hanford Site, Richland, Washington Summary This EA evaluates the environmental impacts from vegetation management in the "project area" of the Hanford Site. The project area excludes most of the Hanford Reach National Monument that is managed by the U.S. Fish and Wildlife Service (USFWS) under permit from DOE. Vegetation managment under the EA would be consistent with and complement similar efforts currently being performed by the USFWS on the Monument. Based on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the meaning of NEPA, and that preparation of

219

http://www.oha.doe.gov/regs/Proposed708.htm  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

[6450.01P] [6450.01P] DEPARTMENT OF ENERGY 10 CFR PART 708 [RIN 1901-AA78] Criteria and Procedures for DOE Contractor Employee Protection Program AGENCY: Department of Energy ACTION: Notice of proposed rulemaking SUMMARY: The Department of Energy (DOE) proposes amendments for its contractor employee protection program which provides recourse to DOE contractor employees who believe they have been retaliated against for activities such as a disclosure of information regarding management of environmental, safety, health, and other matters, for participating in Congressional proceedings, or for refusing to engage in illegal or dangerous activities. DATES: Written comments should be forwarded not later than ____________ [insert the date 60 days from date of this FR

220

Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1997--June 1997  

SciTech Connect

This compilation summarizes significant enforcement actions that have been resolved during the period (January - June 1997) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

NONE

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Emergencies and Emergency Actions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergencies and Emergency Actions Emergencies and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review. September 8, 2005 Memorandum for Federal NEPA Contacts: Emergency Actions and NEPA This Council on Environmental Quality memorandum provides general information on (1) the response to hurricane Katrina;

222

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) 5/31/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2002 31, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management at the Lines Creek Microwave site. The proposed work will be accomplished within the fenced area of the facility. Location: The Lines Creek Microwave site is located at SWSW Section 33 T44N R2E within Shoshone County, Idaho, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes bare ground vegetation management at the microwave site. Bare ground management is needed to prevent fire damage and maintain a vegetation free environment on the site.

223

DOE/EIS-0265-SA-170: Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project (8/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2004 1, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-170) Jonathan McCloud Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Tapteal Bend Riparian Corridor Restoration Project Project No: 2002-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.9 Structural Bank Protection Using Bioengineering Methods, 2.1 Maintain Healthy Riparian Plant Communities Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) and the Tapteal Bend Greenway Association Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

224

(DOE/EIS-0285-SA-87): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Cowlitz Tap-Olympia White River 7/23/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-87) Mark Shaw TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Protect and Restore the Asotin Creek Watershed - Upper Charley Subwatershed Ecosystems Restoration Projects (road obliteration) Project No: 2002-054-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 7.18 Road Closure Location: Charley Creek Subwatershed, Umatilla National Forest, Idaho Proposed by: Bonneville Power Administration (BPA) and the Nez Perce Tribal Fisheries/Watershed Program Description of the Proposed Action: BPA is proposing to fund a project that will address

225

Audit of Proposal to Acquire Land at the Fernald Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposal to Acquire Land at the Fernald Environmental Management Project, ER-B-97-03 Audit of Proposal to Acquire Land at the Fernald Environmental Management Project, ER-B-97-03...

226

February 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Technical Standards Program Document Status Visit the Technical Standards Program Web Site: http://tis.eh.doe.gov/techstds/ Activity Summary In Conversion - 4 In Preparation - 35 Out for Comment - 18 Published this Month - 1 FY 2001 5-year Reviews Revisions in Progress - 2 Reaffirmations in Progress - 2 Supersedures in Progress - 6 Cancellations Pending - 11 Cancellations in Progress - 33 No Current Action - 16 DOE Technical Standards Project Canceled If you have any questions about this action, please contact the person listed be- low. The following DOE Technical Standards project was recently canceled: * EM Facility Hazard Categorization, Project Number SAFT-0029; EM Technical Standards Manager, John Serocki, 301-903-7999, John.Serocki@em.doe.gov, or Tom Wright, 301-903-3661, Tom.Wright@em.doe.gov. The need for this

227

Management  

E-Print Network (OSTI)

Research has indicated that, depending upon driver and passenger characteristics, passengers can have either a positive or negative influence upon driver behaviour. In conclusion to a recent study investigating the roles that passengers can play to influence, positively and negatively, driver behaviour, Regan and Mitsopoulos (2001) recommended, among other things, that the principles of Crew Resource Management (CRM) training may increase passengers ability to positively influence driver behaviour and also drivers ability to accept constructive feedback. The present study investigated the potential application of CRM training within young driver training in the Australian Capital Territory (ACT). This involved a literature review, an analysis of the differences between the driving and aviation domains, an analysis of the team-based activities and the knowledge, skills and attitudes required during driving to perform those activities, consultation with CRM experts from the aviation and medicine domains and the conduct of six focus groups involving young learner drivers, provisional licence drivers and course teachers. The findings indicate that CRM training as part of young driver training in the ACT is a viable concept to pursue. The application of CRM training within young driver training has potential to significantly enhance the positive and reduce the negative effects of passengers on young driver behaviour, and thus the safety of young drivers and passengers alike. The outcomes of this study formed the basis for a set of recommendations for the development of a young driver CRM training program in the ACT.

Young Drivers; Eve Mitsopoulos; Michael Regan; Janet Anderson; Paul Salmon; Jessica Edquist; Ii Report Documentation Page

2005-01-01T23:59:59.000Z

228

Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3  

SciTech Connect

The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

Not Available

1994-02-01T23:59:59.000Z

229

Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4  

Science Conference Proceedings (OSTI)

The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

Not Available

1994-05-01T23:59:59.000Z

230

Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2  

SciTech Connect

The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

Not Available

1994-01-01T23:59:59.000Z

231

(DOE/EIS-0265/SA-03): Supplement Analysis for the Watershed Management Program EIS 10/16/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) 3) Dorothy Welch, KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Couse/Tenmile Creeks Six-Year Direct Seed Program Project No: 2002-050-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 3.2 Conservation Cropping Sequence, 3.3 Conservation Tillage, 3.8 Delayed Seed Bed Preparation, 3.9 Grasses and Legumes in Rotation, 3.26 Evaluate Field Limitations, 3.27 Equipment Calibration and Use Location: Various properties in Anatone, Asotin County, Washington Proposed by: Bonneville Power Administration (BPA) and The Asotin County Conservation District (ACCD). Description of the Proposed Action: BPA proposes to fund a six-year direct seed program

232

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-72)(12/3/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 3, 2001 December 3, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-72) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II. Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase 2 privately owned parcels

233

Supplement Analysis for the Watrshed Management Program EIS (DOE/EIS-0265/SA-75) (2/20/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2002 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-75) Peter Lofy - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Gourlay Creek Fish Ladder Project Project No: 2001-038-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Columbia County, Oregon Proposed by: Bonneville Power Administration (BPA) and the City of Scappoose Description of the Proposed Action: BPA proposes to fund the construction of a fish passage facility at the Gourlay Creek Dam/water reservoir in Columbia County, Oregon. The City of

234

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) (10/4/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) Jay Marcotte Fish and Wildlife Project Manager Proposed Action: Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin. Project No: 2001-039-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Various Walla Walla River Basin Irrigation Diversions, Washington Proposed by: Bonneville Power Administration (BPA), the Walla Walla County Conservation District. Description of the Proposed Action: BPA is proposing to provide cost share for a program that

235

(DOE/EIS-0265/SA-92): Supplement Analysis for the Watershed Management Program EIS 10/16/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2) 2) Dorothy Welch, KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Asotin Creek Six-Year Direct Seed Program Project No: 1999-060-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 3.2 Conservation Copping Sequence, 3.3 Conservation Tillage, 3.8 Delayed Seed Bed Preparation, 3.9 Grasses and Legumes in rotation, 3.26 Evaluate Field Limitations, 3.27 Equipment Calibration and Use. Location: Various locations in the Asotin Creek Watershed, WA. Proposed by: Bonneville Power Administration (BPA) and Asotin County Conservation District (ACCD). Description of the Proposed Action: BPA proposes to fund a no-till/direct seed farming

236

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-70) (10/23/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2001 23, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-70) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase I. Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Description of the Proposed Action: BPA proposes to purchase 4 privately owned parcels totaling

237

Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: Determine whether COCs are present. If COCs are present, determine their nature and extent. Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is recommended for the remaining 10 CASs in CAU 562. A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.

Mark Krause

2010-08-01T23:59:59.000Z

238

JGI - CSP Proposal Study Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

User Programs User Programs Project Management Office Community Science Program Emerging Technologies Opportunity Program Technology Development Pilot Program Genomic Encyc. of Bacteria and Archaea MyJGI: Information for Collaborators The CSP Proposal Study Panel CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | Project Management | Forms | FAQ | People and Contacts Members Nina Agabian University of California, San Francisco, http://www.ucsf.edu Chris Amemiya Benaroya Research Institute at Virginia Mason, http://www.benaroyaresearch.org Gary L. Andersen Lawrence Berkeley National Laboratory, http://www.lbl.gov Jo Ann Banks Purdue University, http://www.purdue.edu John Battista Louisiana State University, http://www.lsu.edu Fred Brockman

239

U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.).  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COALITION; COALITION; INFORMATION NETWORK FOR RESPONSIBLE MINING; CENTER FOR NATIVE ECOSYSTEMS; CENTER FOR BIOLOGICAL DIVERSITY; and SHEEP MOUNTAIN ALLIANCE, Plaintiffs, v. OFFICE OF LEGACY MANAGEMENT; and UNITED STATES DEPARTMENT OF ENERGY, Defendants. OPINION AND ORDER This matter is before the Court on Plaintiffs' appeal seeking judicial review of (1) Defendants' decision in 2007 to expand the Uranium Lease Management Program ("ULMP") in southwestern Colorado; (2) Defendants' issuance of leases to uranium mining companies under the ULMP; and (3) Defendants' approvals of exploration or reclamation activities on certain lease tracts. The matter has been fully briefed (ECF No. 78, 82, 88), and Defendants have submitted the administrative record to the Court

240

August 2001 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-31-2001 7-31-2001 Activity Summary In Conversion-4 In Preparation-43 Out for Comment-17 Published this Month-0 5-year Review Status Revision in Progress-6 Reaffirmation in Progress-23 Cancellation Pending-4 Cancellation in Progress-12 Proposed for Cancellation-13 No Current Action-11 Inside this issue: DOE Technical Standards Project Initiated 1 DOE Technical Standards Recently Sent for Coordination 1 DOE Technical Standard Recently Reaffirmed 1 DOE Technical Standards Recently Published 2 American National Standards Institute 2 American National Standards 4 American Society for Testing and Materials 5 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- August 2001 Standards

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

1995 Department of Energy Records Management Conference  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) Records Management Group (RMG) provides a forum for DOE and its contractor personnel to review and discuss subjects, issues, and concerns of common interest. This forum will include the exchange of information, and interpretation of requirements, and a dialog to aid in cost-effective management of the DOE Records Management program. Issues addressed by the RMG may result in recommendations for DOE-wide initiatives. Proposed DOE-wide initiatives shall be, provided in writing by the RMG Steering Committee to the DOE Records Management Committee and to DOE`s Office of ERM Policy, Records, and Reports Management for appropriate action. The membership of the RMG is composed of personnel engaged in Records Management from DOE Headquarters, Field sites, contractors, and other organizations, as appropriate. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

NONE

1995-07-01T23:59:59.000Z

242

(DOE/EIS-0285/SA-64): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/26/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2002 6, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-64) Truman Conn - TFP Regional Manager, Walla Walla Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities in the Walla Walla Region (See Attachment A for a complete list of facilities) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities

243

Nuclear facility decommissioning and site remedial actions  

SciTech Connect

The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

1990-09-01T23:59:59.000Z

244

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-96) Snohomish District Substations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6) 6) - Snohomish District Substations Dennis Sjoquist - TFN/Snohomish Snohomish Regional Manager Proposed Action: Vegetation Management for the following facilities located in the Snohomish District: Bellingham Custer Fidalgo Intalco Lopez Island Monroe Murray, V.M. Snohomish Snoking Whatcom Whatcom Skagit Whatcom San Juan Snohomish Snohomish Snohomish Snohomish Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Snohomish District of the Snohomish Region. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities.

245

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-94) Covington District Substations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4) 4) - Covington District Substations Dennis Sjoquist - TFN/Snohomish Snohomish Regional Manager Proposed Action: Vegetation Management for the following facilities located in the Covington District: Covington Echo Lake Lynch Creek Maple Valley Narrows Raver, P.J. South Tacoma Steilacoom Surprise Lake Tacoma King King Pierce King Pierce King Pierce Pierce Pierce Pierce Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Covington District of the Snohomish Region. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities.

246

Federal Energy Management Program: Energy Agency Coordinators...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Energy Action Month to someone by E-mail Share Federal Energy Management Program: Energy Agency Coordinators for Energy Action Month on Facebook Tweet about Federal...

247

July 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program Document Status 06-28-2005 Activity Summary In Conversion - 4 In Preparation - 21 Out for Comment - 10 Published in June - 2 5-year Review Status Proposed for Revision-6 Revision in Progress-3

248

3Q/4Q99 F-Area Hazardous Waste Management Facility Corrective Action Report - Third and Fourth Quarter 1999, Volumes I and II  

Science Conference Proceedings (OSTI)

Savannah River Site (SRS) monitors groundwater quality at the F-Area Hazardous Waste management Facility (HWMF) and provides results of this monitoring to the South Carolina Department of Health and Environmental Control (SCDHEC) semiannually as required by the Resource Conservation and Recovery Act (RCRA) permit. SRS also performs monthly sampling of the Wastewater Treatment Unit (WTU) effluent in accordance with Section C of the Underground Injection Control (UIC) application.

Chase, J.

2000-05-12T23:59:59.000Z

249

Corrective Actions Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Stewardship Environmental Cleanup Corrective Actions Corrective Actions Process The general process for evaluating and remediating potential release sites is called...

250

Request for Proposal | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Request for Proposal | National Nuclear Security Administration Request for Proposal | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Request for Proposal Home > About Us > Our Operations > Acquisition and Project Management > Major Contract Solicitations > Environmental Program Services Contract >

251

Recommendations for improvements to program and project management  

SciTech Connect

Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

Not Available

1994-01-01T23:59:59.000Z

252

DOE/EIS-0265-SA-168: Supplement Analysis for the Watershed Management Program EIS - Protect and Restore Lolo Creek Watershed - Jim Brown Creek Streambank Stabilization (08/10/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-168) Sabrina Keen Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Protect and Restore Lolo Creek Watershed - Jim Brown Creek Streambank Stabilization Project No: 1996-077-02 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection using Bioengineering Methods Location: Clearwater County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Nez Perce Tribe Description of the Proposed Action: The Bonneville Power Administration, Nez Perce Tribe, and Potlatch Corporation are proposing to stabilize streambanks along Jim Brown Creek near

253

December 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Standards Forum & Standards Actions Page 1 December 2007 The Standards Forum & Standards Actions Page 1 December 2007 Continued on next page Technical Standards Program Manager's Note 1 Teaching Standards Development- Inspiring the Next Generation 2 The EPA Radiation Standard for Spent-Fuel Storage in a Geological Repository 3 Expanded Access to Hydrogen Codes and Standards 4 Really Following the Building Code 6 Technical Standards Manager Spotlight 7

254

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Coal Survey Form Changes 2013 Proposals The U.S. Energy Information Administration (EIA) is proposing to change its data protection policy for the following survey forms: Form...

255

SSRL Call for Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

Crystallography proposals are due April 1 and July 1 Due to the installation and commissioning of SPEAR3 (April 2003-January 2004), the schedule for proposal submissions has...

256

EAC Recommendations for DOE Action Regarding Development of the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next...

257

DNFSB staff trip report reviewing the corrective action process...  

NLE Websites -- All DOE Office Websites (Extended Search)

deficiencies that are safety significant. b. The primary corrective action database management systems used at Hanford include the Central Information Control System (CICS) used...

258

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

for Residual Radioactivity at Formerly Utilized Sites Remedial Action Program and Remote Surplus Facilities Management Program Sites (Rev. 1, July 1985). .. . -.-----...

259

Action plan for the Tiger Team assessment report  

Science Conference Proceedings (OSTI)

This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

Not Available

1990-08-30T23:59:59.000Z

260

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-68)(10/12/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2001 12, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-68) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Mill Creek and Little Creek Crossing Improvement Project No: 1992-026-01 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.13 Culvert Removal/Replacement to Improve Fish Passage. Location: Mill Creek and Little Creek, Union County, Oregon Proposed by: Bonneville Power Administration (BPA), the Grande Ronde Model Watershed Program (GRMWP), and the Union County Public Works Department (UCPWD) Description of the Proposed Action: BPA provides funds to the Grande Ronde Model Watershed

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) (9/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2001 7, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Pelican Creek Crossing Improvement Project No: 1992-026-01 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.13 Culvert Removal/Replacement to Improve Fish Passage. Location: Pelican Creek, Union County, Oregon Proposed by: Bonneville Power Administration (BPA), the Grande Ronde Model Watershed Program (GRMWP), and the Union County Public Works Department (UCPWD) Description of the Proposed Action: BPA provides funds to the Grande Ronde Model Watershed

262

Joint Environmental Assessment of the California Department of Food and Agriculture Curly Tope Virus Control Program for the Bureau of Land Management and Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JOINT ENVIRONMENTAL ASSESSMENT JOINT ENVIRONMENTAL ASSESSMENT 2002-2006 OF THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE CURLY TOP VIRUS CONTROL PROGRAM FOR BUREAU OF LAND MANAGEMENT AND DEPARTMENT OF ENERGY DOE/EA-# 1363 April, 2002 2 TABLE OF CONTENTS Page No. I. INTRODUCTION 9 A. Purpose and Need......................................................... 10 B. Background................................................................... 10-11 II. PROPOSED ACTIONS AND ALTERNATIVES Alternative 1 - Proposed Action........................................... 12 General Program.................................................... 12-15 Program Specifics.................................................. 15-18 Public Health and Environmental Considerations:

263

EMSL: Proposal Extensions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Summary/Extension for Fiscal Year 2014 Proposal Summary/Extension for Fiscal Year 2014 Published December 2013. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo Summaries of the work performed with EMSL resources are required for all user projects (see details below) and should be submitted through the User Portal. For projects open for one year or less, these summaries are due when the proposal closes. For projects that are submitted in response to a Call for Proposals and are eligible for yearly extensions, summaries are

264

DOE/EIS-0285/SA-101: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Spokane Region (9/13/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 13, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-101) Spokane Region Michael F. Brock - TFS/BELL-1 Regional Manager, Spokane Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities (See Attachment A for a complete list of facilities) Location: Spokane Region. (See Attachment A) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare

265

Rem&al Action Performed  

Office of Legacy Management (LM)

Rem&al Action Performed Rem&al Action Performed at the B&T Metals Site in * Columbus, Ohio Department of Energy Office of Assistant Manager for Environmenta/ Management Oak Ridge Operations June 2007 Printed on recycled/recyclable paper. 1.41 2503.2 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PER-FORMED AT THE B&T METALS SITE IN COLUMBUS, OHIO JUNE 200 1 Prepared for United States Department of Energy Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 B&TFinal 6/2001 CONTENTS FIGURES ..................................................................................................................................................... iv ACRON-YhiS ...............................................................................................................................................

266

Columbia River Gorge Vegetation Management Project Final Environmental Assessment DOE/EA-1162  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COLUMBIA COLUMBIA RIVER MANAGEMENT PR GORGE OJECT VEGETAT ON Final Environmental Assessment DO E/EA-l 162 BONNEVILLE row,. ..", ",,,,.,,0. W x ? -- -- ------ .- .-- b I . , (, I I I ( t ,1 ,0 , . ,' I , ,- , !" 1 , I I ,; ,, 1 1 I .1 . . COLUMBIA RIVER GORGE VEGETATION MANAGEMENT ENVIRONMENTAL ASSESSMENT (Hanford-Ostrander and North BonnevilI&Midway Transmission Line Rights-of-Way) Table of Contents Page . 2 3 pqose and Need Background hbfic evolvement Swq ' ' Decbions to Be Made PROPOSED A~ON AND ~~RNA~S Mtemative k No Action " Manual, Mechnical, and Biological Metbh - Ntemative W. Proposed Action- htegrated Vegetation Management ~) tih Herbicides Herbici& Meth& -. PhedActions Comparison of Mtematives ~ . . . . . . ti~D E~OW~ ~ E_O_~m .. CONSEQ~N~S Affmd Environment . Environment Consquen~ hti Use Soils Vegetation Water Resources WildlfeResources Air Quali@lGlobal Warning

267

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

268

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

269

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

270

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/28/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 28, 2002 June 28, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-27) Ron Morinaka, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Abbot Creek Fish Barrier Project (Hungry Horse Mitigation / Habitat Improvements) Project No: 1991-19-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 8.2 Control of Predators and Nuisance Animals Location: Kalispell, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife & Parks Description of the Proposed Action: BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout

271

EIS (DOE/EIS-0246/SA-18) Supplement Analysis for the Watershed Management Program EIS 10/17/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: October 17, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-18) Charlie Craig - KEWU Fish and Wildlife Project Manager Proposed Action: Eugene Wetlands Acquisition Phase II Project No: 1992-059-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee- Title Acquisition, 1.2 Easement Acquisition. Location: Lane County, Oregon Proposed by: Bonneville Power Administration (BPA) and The Nature Conservancy Description of the Proposed Action: BPA proposes to fund the acquisition and preservation of approximately 99 acres of native wet prairie and oak woodland habitat in Lane County, Oregon.

272

EMSL: Proposal Guidance:  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

273

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

274

Federal Energy Management Program: Program Areas  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

program areas of the Federal Energy Management Program (FEMP) focus on specific energy management actions to help Federal agencies deploy the available technologies appropriate...

275

February 2013 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Standards Actions Technical Standards Program Newsletter U . S . D E PA R T M E N T O F O ffi ce O f nuclear SaFety ENERGY inSide thiS iSSue * Featured DOE Technical Standards Activities * DOE Technical Standards Cost- Savings and Access Improvement Initiative * Domestic and International Nuclear Energy Voluntary Consensus Standards Needs * Nuclear Safety- Related Standards Activity Featured dOe technical StandardS activitieS DOE Technical Standards Cost-Savings and Access Improvement Initiative By Helen Todosow, Brookhaven National Laboratory The Department of Energy (DOE) Technical Standards Managers (TSM) are actively exploring ways to save the government and tax payers' money while at the same time significantly improving efficiencies in access and use of voluntary consensus

276

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

277

IX disposition project, project management plan  

SciTech Connect

This subproject management plan defines the roles, responsibilities, and actions required for the execution of the IX Disposition Project.

WILLIAMS, N.H.

1999-05-11T23:59:59.000Z

278

Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1  

SciTech Connect

The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

Not Available

1993-08-01T23:59:59.000Z

279

(DOE/EIS-0285/SA-04): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/27/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 27, 2001 March 27, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-04) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Ponderosa - Pilot Butte 18/2 to 18/4 Relocation Location: The project area is in the City of Bend, OR, in Deschutes County. Proposed by: Bonneville Power Administration Description of the Proposed Action: BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa - Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. Analysis: 1. Description of right-of-way and vegetation management needed: The project involves

280

DOE/EIS-0285-SA-62: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (4/16/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE April 16, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Rocky Reach - Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. Location: The ROW is located King County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

General User Proposal Scores  

NLE Websites -- All DOE Office Websites (Extended Search)

General User Proposal Scores General User Proposal Scores General User Proposal Scores Print Tuesday, 01 June 2010 10:34 Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beamtime requests exceed available beamtime, a cutoff score is assigned after which no beam time is allocated. proposal scores Beam Time Cutoff Scores for the Current Cycle The table below lists the percent of beam time shifts allocated/requested for each beamline, and the cutoff scores, below which no beam time was assigned.

282

Management Solution  

E-Print Network (OSTI)

MEMO: Request for proposal for Computer-Aided Facilities and Maintenance Management application software; professional services; development services for interfaces to Financial Management and Human Resources systems; configuration, test, train, maintenance and support services to implement and maintain a CAFM Solution for the California Administrative Office of the Courts, the Trial Courts, the Appellate Courts and the Judicial Council, known as The AOC Group. You are invited to review and respond to the attached Request for Proposal (RFP):

Rfp Number Isdcafm

2004-01-01T23:59:59.000Z

283

DOE/EIS-0265-SA-164: Supplement Analysis for the Watershed Management Program EIS (8/2/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2004 , 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-164) Mickey Carter TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - L-9 Irrigation Diversion Modification Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish Passage Enhancement - Fishways, 4.1 Irrigation Water Management, 4.2 Water Measuring Devices, 4.23 Intake and Return Diversion Screens, 4.25 Consolidation/Replace Irrigation Diversion Dams Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Lemhi Soil and Water Conservation District

284

Corrective Action Tracking System User's Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corrective Action Tracking System User's Guide Corrective Action Tracking System User's Guide Corrective Action Tracking System User's Guide September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes process requirements and responsibilities for DOE line managers to develop and implement corrective actions to effectively resolve safety findings arising from: Findings as identified by the Office of Independent Oversight and Performance Assurance Environment, Safety and Health and Emergency Management assessments; Judgments of Need as identified by Type A accident investigations: Other sources as directed by the Secretary or Deputy Secretary, including crosscutting safety findings. Corrective Action Tracking System User's Guide

285

Corrective Action Tracking System User's Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corrective Action Tracking System User's Guide Corrective Action Tracking System User's Guide Corrective Action Tracking System User's Guide September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes process requirements and responsibilities for DOE line managers to develop and implement corrective actions to effectively resolve safety findings arising from: Findings as identified by the Office of Independent Oversight and Performance Assurance Environment, Safety and Health and Emergency Management assessments; Judgments of Need as identified by Type A accident investigations: Other sources as directed by the Secretary or Deputy Secretary, including crosscutting safety findings. Corrective Action Tracking System User's Guide

286

(DOE/EIS-0285/SA-78): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (07/01/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-78) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for ten Substations in the Redmond District. (See list of facilities listed under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Redmond District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In

287

(DOE/EIS-0285/SA-81): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/9/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 9,2002 July 9,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-81) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for fifteen Substations in The Dalles District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within The Dalles District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

288

(DOE/EIS-0285/SA-74): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/1/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2002 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-74) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for five Substations in the Malin District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Malin District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In addition,

289

(DOE/EIS-0285/SA-82): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 13, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3,2002 3,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82 Jeffrey Hathhorn Redmond Deputy Regional Manager - TFI/IDAHO FALLS Proposed Action: Vegetation Management for twenty-four Substations in the Burley District. See list of facilities under planning step 1). Location: See list of facilities under Planning Step 1. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

290

Proposed Evanston Offshore Wind Farm  

NLE Websites -- All DOE Office Websites (Extended Search)

Evanston Offshore Wind Farm Evanston Offshore Wind Farm August 1, 2011 Monday, August 1, 2011 Off Shore Wind Farm FAQ Document available from http://www.greenerevanston.org/ at the Renewable Energy Task Force tab Monday, August 1, 2011 City Manager Commits to City to sign onto Kyoto emissions reduction goals Wind Farm Timeline April 2006 Summer 2007 Fall 2008 February 2008 April 2010 March 2011 July 2011 Network for Evanston's Future proposes joint climate planning effort CGE Formed and Renewable Energy Task Force formed - Wind farm concept begun ECAP passed by City Council with 1st version of proposed Offshore Wind Farm included Offshore Wind Farm RFI unanimously passed by City Council Mayor Tisdahl appointments Committee on the Wind Farm City Council

291

ARM - Submitting Proposals : Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

292

EIS-0279: Spent Nuclear Fuel Management, Aiken, South Carolina | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Spent Nuclear Fuel Management, Aiken, South Carolina 79: Spent Nuclear Fuel Management, Aiken, South Carolina EIS-0279: Spent Nuclear Fuel Management, Aiken, South Carolina SUMMARY The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 5, 2013 EIS-0279: Amended Record of Decision Spent Nuclear Fuel Management at the Savannah River Site April 1, 2013 EIS-0279-SA-01: Supplement Analysis Savannah River Site Spent Nuclear Fuel Management (DOE/EIS-0279-SA-01 and

293

Negotiating equity for management of DOE wastes  

SciTech Connect

One important factor frustrating optimal management of Department of Energy (DOE)-complex wastes is the inability to use licensed and permitted facilities systematically. Achieving the goal of optimal use of DOE`s waste management facilities is politically problematic for two reasons. First, no locale wants to bear a disproportionate burden from DOE wastes. Second, the burden imposed by additional wastes transported from one site to another is difficult to characterize. To develop a viable framework for equitably distributing these burdens while achieving efficient use of all DOE waste management facilities, several implementation and equity issues must be addressed and resolved. This paper discusses stakeholder and equity issues and proposes a framework for joint research and action that could facilitate equity negotiations among stakeholder and move toward a more optimal use of DOE`s waste management capabilities.

Carnes, S.A.

1994-09-01T23:59:59.000Z

294

Negotiating equity for management of DOE wastes  

SciTech Connect

One important factor frustrating optimal management of DOE-complex wastes is inability to use licensed and permitted facilities systematically. Achieving the goal of optimal use of DOE`s waste management facilities is politically problematic for two reasons. First, no locale wants to bear a disproportionate burden from DOE wastes. Second, the burden imposed by additional wastes transported from one site to another is difficult to characterize. To develop a viable framework for equitably distributing these burdens while achieving efficient use of all DOE waste management facilities, several implementation and equity issues must be addressed and resolved. This paper discusses stakeholders and equity issues and proposes a framework for joint research and action that could facilitate equity negotiations among stakeholders and move toward a more optimal use of DOE`s waste management capabilities.

Carnes, S.A.

1993-11-01T23:59:59.000Z

295

Proposed Rules Federal Register  

NLE Websites -- All DOE Office Websites (Extended Search)

information that it is making available about the liquid-immersed distribution transformer equipment classes that were analyzed in a previously issued notice of proposed...

296

SPPR Group Proposal  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Proposal June 23, 2010 Agenda Purpose of Meeting Presenters Background Information  Three Terminal Plan & Market Access  Business Case  Transmission Infrastructure Program ED5-Palo Verde Project Potential Rate Impacts Discussion / Comments 2 Purpose of Meeting Provide background information Share the SPPR Group's current proposal and how it might affect Parker-Davis Project (P-DP) customers Obtain your feedback on the proposal 3 Presenters Background Information - Todd Rhoades ED5-PV Project Description - Todd Rhoades Project Marketability - John Steward Project Cost & Financing - Jack Murray Potential Rate Impacts - Jack Murray Next Steps - Todd Rhoades 4 Three Terminal Plan November 2009 5 Business Case

297

2014 Coal Form Proposals  

U.S. Energy Information Administration (EIA)

Coal Survey Form Changes Proposed for 2014. The U.S. Energy Information Administration (EIA) has begun the process of re-clearing the coal survey ...

298

ARM - AAF Proposal Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns...

299

Environmental Assessment for the Proposed Los Alamos National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of No Significant Impact for the Los Alamos National Laboratory Proposed Trails Management Program, Los Alamos, New Mexico U. S. Department of Energy National Nuclear Security...

300

(DOE/EIS-0285/SA-45): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5) 5) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Benton County noxious weed management along BPA rights-of-ways, transmission structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the ROW, ROW width, and ROW length of the proposed action. Includes all BPA 115kV, 230kV, 345kV and 500 kV ROWs in Benton County, Washington. Location: The ROWs are all located in Benton County, Washington, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear noxious and/or unwanted low-growing vegetation in all BPA ROWs in Benton County, Washington. In a cooperative effort, BPA, through landowners and the Benton County Weed Control Board, plan to eradicate noxious plants and other

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

(DOE/EIS-0285/SA-46): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6) 6) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Franklin County noxious weed management along BPA rights-of-ways, transmission structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the ROW, ROW width, and ROW length of the proposed action. Includes all BPA 115kV, 230kV, and 500 kV ROWs in Franklin County, Washington. Location: The ROWs are all located in Franklin County, Washington in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear noxious and/or unwanted low-growing vegetation in all BPA ROWs in Franklin County, Washington. In a cooperative effort, BPA, through landowners and the Franklin County Weed Control Board, plan to eradicate noxious plants and other

302

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

303

(DOE/EIS-0285/SA-59): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/19/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 19, 2002 April 19, 2002 REPLY TO ATTN OF: KEP SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-59) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis Covington/ Raver Paul / Paul Alston 230 and 500 kV Transmission line Corridor ROW 48/2 to 70/6 and 1/1 to 13/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with a corridor width of 250 to 442 feet. Location: The ROW is located in Thurston County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

304

(DOE/EIS-0285/SA-07): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/18/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2001 18, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-07) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management on section of three ROWs. The ROWs include selected sections of the McNary Powerhouse, the present and proposed new sections of the McNary-Roundup and the McNary Switchyard South Transmission lines. Location: All ROW are located east Umatilla, OR., all being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

305

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

306

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

307

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

308

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

309

(DOE/EIS-0285/SA-75): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (06/21/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June June 21, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington. Jim Jellison -- - TFO/Olympia Ed Tompkins -- - TFO/Ross Proposed Action: Vegetation Management for the Ross Lexington Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and

310

(DOE/EIS-0285/SA-103): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 12, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-103-Keeler-Pennwalt). Jim Jellison - TFO/Olympia Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for the Keeler-Pennwalt transmission line and parts of the St. John-Keeler, Rivergate-Keeler, Keeler-Oregon City, & St. John-St. Helens lines. Location: Washington and Multnomah Counties, Oregon Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: See the attached checklist for the

311

Implementation plan: Executive summary. Environmental restoration and waste management programmatic environmental impact statement  

SciTech Connect

In November 1989, the Secretary of Energy established the U.S. Department of Energy Office of Environmental Restoration and Waste Management. This action consolidated the Department`s environmental restoration and waste management activities throughout the nation. In January 1990, the Secretary of Energy decided that the Department would prepare a Programmatic Environmental Impact Statement on the proposed integrated Environmental Restoration and Waste Management Program. The principal focus of the Programmatic Environmental Impact Statement process will be the evaluation of strategies for conducting remediation of Department sites and facilities to ensure the protection of human health and the environment; and the evaluation of potential configurations for waste management capabilities.

Not Available

1994-01-01T23:59:59.000Z

312

Federal Energy Management Program: Outreach  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Awards for Leadership in Federal Energy Management, and Department of Energy (DOE) Sustainability programs. Energy Action Month: Observed in October of each year, FEMP Energy...

313

Federal Energy Management Program: Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

answers to available FAQs, select a topic from the drop-down menu. Select One... Fleet Management Energy Action Month Energy Efficient Product Procurement Training Renewable...

314

DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAG EMENT CENTER MANAG EMENT CENTER NEPA DETERMINATION RECIPIENT:City of Philadelphia PROJECT TITLE: Ambler Boiler House Geothermal Wells, Cool Roof and PV installation Page 1 of3 STATE: PA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOO148 DE-EE-0003568 GFO-OOO3568-001 0 Based on my review urthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA). I have made the follm~'ing determination: ex. EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conse rve energy or water (a) ActIons to conserve energy or water, demonstrate potential energy or water conservation, and promote energy efficiency that would not have the potential to cause significant changes in the indoor or outdoor concentrations of potentially harmful

315

Proposal Review Panel Descriptions  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Review Panel Descriptions Proposal Review Panel Descriptions To ensure competent scientific review, a proposal may be assigned to a different panel (at the discretion of the Review Panel Chair), or the panel may seek additional ad hoc reviews from other experts. High-Pressure This panel reviews scattering and diffraction proposals that focus on materials at high pressure. Techniques such as (but not limited to) diffraction, nuclear resonant scattering, and inelastic x-ray scattering for materials at high pressure are appropriate for this panel to consider. Instrumentation This panel reviews proposals related to the development of beamline instrumentation, sample environments, x-ray optical components, and/or detectors that are relevant to synchrotron radiation research. This panel

316

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

317

Natural resource management activities at the Savannah River Site. Environmental Assessment  

Science Conference Proceedings (OSTI)

This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

Not Available

1993-07-01T23:59:59.000Z

318

(DOE/EIS-0285/SA-56): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/9/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09, 2002 09, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-56) 2ULRQ $OEUR 2O\PSLD 5HJLRQDO 0DQDJHU Proposed Action: Vegetation Management for the following electric yards located in the Ross District: Cape Horn North Bonneville Stevenson Carson Underwood Troutdale Cascade Locks Acton Ross 345kV and J.D. Alcoa Sifton St. Johns Ostrander McLoughlin Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to maintain a weed-free environment in the electrical substations located within the Olympia Region's Ross District. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical

319

ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE  

Office of Legacy Management (LM)

ADDENDUM TO ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE PROPOSED INTERIM REMEDIAL ACTIONS FOR FY 1983-85 ACCELERATED PROGRAM (1984 VICINITY PROPERTIES CLEANUP) Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois July 1984 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee CONTENTS Page SUMMARY OF PROPOSED ACTION AND RELATED ACTIVITIES ........... 1 HISTORY AND ENVIRONMENTAL SETTING ........................ 4 RADIOLOGICAL CONTAMINATION AND NEED FOR PROPOSED ACTION ........ 4 Property A .. . . . . . . . . . . . . . . . .. . . . . . . 6 Property C' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Property H ...... ............. ... 7 Property H' . . . . . . . . . . . . . . . . . . .. . . . . . . . . 7 Property L ..... ...... .

320

Proposed Technical Specification Amendment  

E-Print Network (OSTI)

This letter provides the final revised Technical Specification (TS) pages for the subject proposed TS amendment. In Reference 1 Duke Energy requested an amendment to the Catawba Nuclear Station Facility Operating Licenses and Technical Specifications (TS). The proposed amendment revises various TS that are affected by the revised heatup, cooldown, critically, and inservice test pressure and temperature (P/T) limits for the reactor coolant system (RCS) of each unit. The proposed amendment also revised the TS requirements for the low temperature overpressure protection (LTOP) system for each unit. www. duke-energy. corn

D. M. Jamil; Duke Power

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Nuclear facility decommissioning and site remedial actions  

SciTech Connect

The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

1989-09-01T23:59:59.000Z

322

EERE PROJECT MANAGEMENT CENTER NEPA DETTIUlIIN .... TION PROJECT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago u.s. DEP .... RTIIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETTIUlIIN .... TION PROJECT TITLE: Chicago Climate Action Plan Advanced Transportation Technologies Initiative STATE: IL Funding Opportunity Announcement Number nla Procurement Instrument Number DE-FG3&-060860S2 NEPA Control Number GFO-G086052-001 Page 1 of2 ClD Number G086052 Based on my review oftbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I bave made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 65.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

323

Green Fund Proposal Guidelines September 15, 2010 UNBC GREEN FUND PROPOSAL GUIDELINES  

E-Print Network (OSTI)

. Anticipated implementation schedule by task. E. Budget i. Costs (overhead, salaries, materials, equipment). ii. Designation of project fund manager (can be the same as Team Leader). iii. Savings estimates for both the address above. B. Review Process The Proposal review process will be as follows: 1. Proposal submission

Northern British Columbia, University of

324

Green Fund Proposal Guidelines August 10, 2012 UNBC GREEN FUND PROPOSAL GUIDELINES  

E-Print Network (OSTI)

. Costs (overhead, salaries, materials, equipment). ii. Designation of project fund manager (can be the same as Team Leader). iii. Savings estimates for both the university and for sustaining the proposed and the proposal should be discussed beforehand with the GUPC by emailing the address above. B. Review Process

Northern British Columbia, University of

325

Energy Action Month | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Outreach » Energy Action Month Services » Outreach » Energy Action Month Energy Action Month October 7, 2013 - 4:43pm Addthis The Federal Energy Management Program (FEMP) supports Energy Action Month by offering materials that promote energy- and water-saving practices in Federal facilities. This year's outreach materials call on Federal employees to take action and empower leadership, innovation, and excellence to realize a secure energy future. Empower Leadership One individual can empower collaboration and teamwork that can spark change and result in sustainable solutions. Empower coworkers, groups, and entire organizations to lead by example, build momentum, and make a difference. Empower Innovation Innovative thinking can guide strategic sustainability plans, generate new best practices, and accelerate the deployment of clean energy technologies.

326

Proposed WSRC Clearance Modifications  

SciTech Connect

Westinghouse Savannah River Company proposes to modify criteria used for releasing material from Savannah River Site radiological areas to other SRS areas and for releasing material from SRS for uncontrolled use.

Crase, K.W.

2002-12-18T23:59:59.000Z

327

Categorical Exclusion Determination Form Program or Field Office: Office of Legacy Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Office of Legacy Management Project Title: Routine monitoring, maintenance, and administrative actions at the Salmon, MS, Site Location: Mississippi Proposed Action or Project Description: American Recovery and Reinvestment Act: D The proposed activities include an annual site visit, annual groundwater and surface water sample collection, the addition of a water access tube to one groundwater monitoring well, and general administrative actions. Categorical Exclusion(s) Applied: 83.1 Site characterization/environmental monitoring A8 Award of contracts for technical supporUmanagement and operation/personal services; A9 Information gathering/data analysis/document preparation/dissemination A 11 Technical advice and assistance to organizations *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFRIO 21 Click Here

328

Management of spent nuclear fuel on the Oak Ridge Reservation, Oak Ridge, Tennessee: Environmental assessment  

SciTech Connect

On June 1, 1995, DOE issued a Record of Decision [60 Federal Register 28680] for the Department-wide management of spent nuclear fuel (SNF); regionalized storage of SNF by fuel type was selected as the preferred alternative. The proposed action evaluated in this environmental assessment is the management of SNF on the Oak Ridge Reservation (ORR) to implement this preferred alternative of regional storage. SNF would be retrieved from storage, transferred to a hot cell if segregation by fuel type and/or repackaging is required, loaded into casks, and shipped to off-site storage. The proposed action would also include construction and operation of a dry cask SNF storage facility on ORR, in case of inadequate SNF storage. Action is needed to enable DOE to continue operation of the High Flux Isotope Reactor, which generates SNF. This report addresses environmental impacts.

1996-02-01T23:59:59.000Z

329

Building Technologies Office: Take Action to Save Energy in Commercial  

NLE Websites -- All DOE Office Websites (Extended Search)

Take Action to Save Take Action to Save Energy in Commercial Buildings to someone by E-mail Share Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Facebook Tweet about Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Twitter Bookmark Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Google Bookmark Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Delicious Rank Building Technologies Office: Take Action to Save Energy in Commercial Buildings on Digg Find More places to share Building Technologies Office: Take Action to Save Energy in Commercial Buildings on AddThis.com... About Take Action to Save Energy Manage Organizational Energy Use Design & Construct New Buildings

330

Guide for the Submission of Unsolicited Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

GUIDE FOR THE SUBMISSION OF GUIDE FOR THE SUBMISSION OF UNSOLICITED PROPOSALS The National Energy Technology Laboratory (NETL), Pittsburgh Office has operational responsibility of the DOE Unsolicited Proposal (USP) Program. All unsolicited proposals should be forwarded by Email to John N. Augustine at DOEUSP@NETL.DOE.GOV who will serve as the single point of contact for all Department of Energy (DOE) unsolicited proposals. Please direct all unsolicited proposals, abstracts and correspondence to: John N. Augustine, Mail Stop 921-107 Unsolicited Proposal Manager U.S. Department of Energy National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 Email: DOEUSP@NETL.DOE.GOV -1- TABLE OF CONTENTS Page Introduction .................................................................................................................................... 3

331

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

332

Momentum Dependent Fundamental Action  

E-Print Network (OSTI)

The fundamental action is dependent on momentum. Some consequences are presented for matter waves and scalar quantum field theory.

Karl De Paepe

2005-07-26T23:59:59.000Z

333

The Standards Actions, January 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Actions Resistance of HVAC Air Ducts and Fittings (new standard); comments due February 6, 1996. * ISO/ASQC A3534-1, Statis- tics - Vocabulary and Sym- bols - Probability and Gen- eral Statistical Terms (new standard); comments due January 26, 1996. * ISO/ASTM/ASQC/NSF 14004, Environmental management systems - General guidelines on principles, systems and Technical Standards Program Document Status as of 12/31/95 Documents Recently Published The Technical Standards Program is sponsoring a project at OSTI to place all DOE technical standards (i.e., standards and handbooks) on the Internet. To date, 57 DOE technical standards have been placed on the Internet at the following address: http://apollo.osti.gov/ html/techstds/ techstds.html The following DOE technical standards have recently

334

About Gender Action  

E-Print Network (OSTI)

Gender Action was established in 2002. It is the only organization dedicated to promoting gender justice and womens rights in all International Financial Institution (IFI) investments such as those of the World Bank. Gender Actions goal is to ensure that women and men equally participate in and benefit from all IFI investments.

unknown authors

2013-01-01T23:59:59.000Z

335

Program or Field Office: Office of Legacy Management U.S. Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Legacy Management Office of Legacy Management U.S. Department of Energy Categorical Exclusion Determination Form Office of Legacy Management * Project Title and 1.0 . No.: Monitoring , maintenance, environmental and biological sampling , and administrative actions on Amchitka and Adak Islands, Aleutian Islands, Alaska. LM No.16-11 . Location: Amchitka and Adak Islands, Alaska Proposed Action or Proj ect Description : This determination form provides the results of an evaluation of potential impacts related to various monitoring and maintenance actions on Amchitka Island and to non-routine collection of environmental and biological samples on and offshore of Amchitka and Adak Islands. DOE is committed to the collection of environmental and biological samples to test

336

EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastruc...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee EA-1936: Proposed Changes to Parcel ED-1 Land...

337

Climate Action Tracker | Open Energy Information  

Open Energy Info (EERE)

Tracker Tracker Jump to: navigation, search Tool Summary Name: Climate Action Tracker Agency/Company /Organization: Ecofys Sector: Climate Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual Website: www.climateactiontracker.org/ Climate Action Tracker Screenshot References: Climate Action Tracker[1] "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The website provides an up-to-date assessment of individual national pledges to reduce their greenhouse gas emissions. In the framework of the UNFCCC, many countries have put proposals on the table about how much they intend to reduce their greenhouse-gas emissions in both the near and the long term.

338

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-59) (8/14/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2001 14, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-59) David Byrnes Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Reestablish Safe Access into Tributaries of the Yakima Subbasin, Tucker Creek Fish Passage Project Project No: 98-034-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish Passage Enhancement - Fishways/Screening, 1.16 Spawning Habitat Enhancements, 1.17 Rearing Habitat Enhancements, 1.5 Install Grade Control Structures and Check Dams. Location: Tucker Creek, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Fisheries

339

(DOE/EIS-0265/SA-88): Supplement Analysis for the Watershed Management Program EIS (08/26/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2002 6, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-88) John Baugher, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: John Day Watershed Restoration (2002-2003) Project No: 1998-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.2 Water Measuring Devices; 4.10 Water Conveyance Pipeline; 4.25 Consolidate / Replace Irrigation Diversion Dams; 6.5 Water Supply: Pipeline. Location: Canyon City, Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Confederated Tribes of the Warm Springs Reservation of Oregon.

340

DOE/EIS-0265-SA-163: Supplement Analysis for the Watershed Management Program EIS (8/04/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-163) John Baugher TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: John Day Watershed Restoration Program Project No: 1998-018-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 4.2 Water Measuring Devices 4.10 Water Conveyance Pipeline, 4.25 Consolidate/Replace Irrigation Diversion Dams, 6.5 Water Supply: Pipeline, 6.10 Access: Fencing; 8.13 Stand Thinning; 8.15 Manage Stands to Enhance Snowpack Location: Sites within the John Day River Watershed, in Wheeler County and Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Confederated Tribes of the Warm

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Service Building 4 Building Room Material Amount Percentage Priority Action  

E-Print Network (OSTI)

Service Building 4 Building Room Material Amount Percentage Priority Action Service Building 4 S160 65 sqft 15.00 P5 Manage S1J74 Friday, February 18, 2011 Page 1 of 2 #12;Building Room Material Amount Manage Mechanical Insulation 100 LF 55.00 P5 Manage Service Buliding 4 S16H6A Gypsum Wallboard Joint

Seldin, Jonathan P.

342

(DOE/EIS-0285-SA-117): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - (Ross Complex) 1/16/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2003 16, 2003 REPLY TO ATTN OF: KEP/CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-117- (Ross Complex) Paul Martin TFHV/CSB2 Proposed Action: Vegetation Management for the non-electric portions of the Bonneville Power Administration's Ross Complex Location: The Ross Complex is located at 5411 NE Highway 99, Vancouver, Clark County, Washington in the BPA Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage and maintain grounds and landscaping in the non-electrical portions of the Ross Facility. Vegetation management at the Facility shall include: 1) bare ground management of graveled storage areas, perimeter roads and parking

343

A Proposed Architecture  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposed Proposed Architecture for the NLC Diagnostic Regions Peter Tenenbaum, for the Diagnostic Region Group LCC-Note-0011 Draft 5-February-1999 1 introduction The NLC Main Linac CD-1 design contains 4 diagnostic regions (injection, extraction, and at the junctions between supersectors); the injector and beam delivery regions contain additional diagnostic regions modelled on those in the main linac, and one additional region may be added to the main linac (at the 330 GeV point, halfway through the third supersector). Each diagnostic region must support a variety of different beam measuring and manipulating tasks. In this Note we propose an overall architecture which permits all of these requirements to be met. 2 Requirements The main linac diagnostic regions must provide the following: * Beam position monitors for use by the conventional fast feedback system, and actuators (DC

344

2014 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for 2014 The U.S. Energy Information Administration (EIA) is proposing changes to its electricity data collection in 2014. These changes involve the following surveys: Form EIA-63B, "Annual Photovoltaic Cell/Module Shipments Report," Form EIA-411, "Coordinated Bulk Power Supply Program Report," Form EIA-826, "Monthly Electric Utility Sales and Revenue Report with State Distributions," Form EIA-860, "Annual Electric Generator Report," Form EIA-860M, "Monthly Update to the Annual Electric Generator Report," Form EIA-861, "Annual Electric Power Industry Report," Form EIA-861S, "Annual Electric Power Industry Report (Short Form)," and

345

DOE/EA-0826: Revised Finding of No Significant Impact for the Natural Resource Management Activities at the Savannah River Site (04/22/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact Finding of No Significant Impact for the Natural Resource Management Activities at the Savannah River Site Agency: U.S. Department of Energy Action: Revised Finding of No Significant Impact Summary: The Department of Energy (DOE) Savannah River Operations Office (SR) prepared an environmental assessment (EA) (DOE/EA-0826) in 1993 to analyze the potential environmental impacts of continued management of natural resources at the Savannah River Site (SRS) located near Aiken, South Carolina. Based on the analyses in the EA, DOE-SR determined that the proposed action was not a major Federal action significantly affecting the human environment within the meaning of NEPA, and for that reason issued a finding of no significant impact (FONSI) dated July 15, 1993. The proposed action in that EA was based upon

346

Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are inactive or abandoned. However, some leachfields may still receive liquids from runoff during storm events. Results from the 2000-2001 site characterization activities conducted by International Technology (IT) Corporation, Las Vegas Office are documented in the Corrective Action Investigation Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. This document is located in Appendix A of the Corrective Action Decision Document for CAU 262. Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. (DOE/NV, 2001).

K. B. Campbell

2002-06-01T23:59:59.000Z

347

Olympic voting system proposal  

Science Conference Proceedings (OSTI)

In an effort to address the contentious issue of judged Olympic events, the Olympic committee has proposed a pilot audience participation system to score the gymnastics and diving competitions in the upcoming 2004 Athens Summer Games. The system would ... Keywords: Olympics usability, audience, design methodology, ergonomics, industrial design, interaction design, interactive, interface, voting

Seamus Costello; Kari Kubala; Matt Turley; Mehmet Uzer

2004-04-01T23:59:59.000Z

348

CALL FOR PROPOSALS ATLANTIC BLUEFIN TUNA RESEARCH  

E-Print Network (OSTI)

1 CALL FOR PROPOSALS ATLANTIC BLUEFIN TUNA RESEARCH JUNE 29, 2010 EXECUTIVE SUMMARY Funding Opportunity Description: Northern bluefin tuna Thunnus thynnus is the object of a major international fishery. Effective fisheries management will depend upon improvements in understanding of bluefin tuna biology

Berkson, Jim

349

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22)(8/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 17, 2001 August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Chief Joseph - Snohomish No.3 and 4 Transmission Line ROW. From STR 94/1 to STR 113/1 Location: The ROW is located in King and Snohomish Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

350

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23)(8/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Schultz - Raver No.1 and 2 from 60/3 to 75/5 and the Olympia - Grand Coulee from 70/2 to 70/5 Transmission Line ROW's. Location: The ROW is located in King County, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and along access roads that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety

351

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26)(9/11/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2001 11, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management on Reedsport-Fairview #1 Transmission Line Structure 1/5 to 39/4. Location: All ROW are located in Coos and Douglas Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

352

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17)(7/24/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: July 24, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along selected sections of the Schulz - Raver No.1, 2, 3 & 4, Olymplia - Grand Coulee NO. 1 Transmission Line ROW's. Location: The ROW's are located in Pierce and King Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety Code and BPA

353

(DOE/EIS-0285/SA-55): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/12/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2002 2, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-55) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Raver - Paul No. 1 Transmission Line ROW from structure 15/5 to 29/3. The transmission line is a 500 kV line. Location: The ROW is located Pierce County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line, including both Reclaim and Danger Trees. Also, access road clearing will be

354

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 10/22/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 22, 2001 October 22, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-27) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. Location: All ROW are located in Marion, Linn, and Lane Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways, around tower structures, and associated access roads that may impede the operation and

355

(DOE/EIS-0285/SA-06): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/13/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4/13/01 4/13/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-06) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation. Location: The pastureland is adjacent to the Walla Walla Substation and is located east and north of the fenced substation, all within the BPA property boundary. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to apply selected herbicides to control annual weeds that are competing with native grasses that were seeded two years ago. Herbicides will also

356

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

357

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25)(9/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2001 5, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) Elizabeth Johnson - TFR/The Dalles Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along selected ROW sections of the Ostrander-Pearl transmission line. The ROWs include sections of the Ostrander-Pearl 500 kV line; the Ostrander-McLoughlin 500 kV line; the Big Eddy-Chemawa 230 kV line and the Big Eddy- McLoughlin 230 kV line. Location: The ROW is located in Clackamas County, Oregon, within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights- of-way and around tower structures that may impede the operation and maintenance of the

358

DOE/EIS-0285-SA-50: Supplement Analysis for the Transmission Vegetation Management Program FEIS (3/15/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/27/01 1 2/27/01 1 United States Government Department of Energy Bonneville Power Administration DATE: March 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-50) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Grizzly-Summerlake (Structures 102/1-104/2) and Grizzly-Captain Jack (Structures 103/1-140/4) Transmission Line Corridors. Location: The project area lies east and northeast Klamath Falls, OR, and is located in Lake and Klamath Counties, Redmond Region. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the rights of

359

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

360

(DOE/EIS-0285/SA-14): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4) 4) Bill Erickson - TFP/ Walla Walla Region Natural Resource Specialist Proposed Action: Vegetation Management at the Teakean Butte Microwave site. Location: Clearwater County, ID, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove 28 danger trees and dense brush from the microwave site in order to provide a 75 -80 foot safety buffer for fire control and Microwave Beam path. The work will protect BPA's investment at the site and provide system reliability. All work will be in accordance with the National Electrical Safety Code and BPA standards. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-33)(11/27/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 27, 2001 November 27, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-33) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance

362

DOE/EIS-0203-SA-01; Supplement Analysis of the INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Office 850 Energy Drive Idaho Falls, Idaho 83401-1563 November 2002 SUBJECT: Conclusions of the Supplement Analysis of the DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs EIS (1995 EIS) ~ Dear Citizen: The Record of Decision (ROD) for the DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs EIS (1995 EIS) left several decisions concerning INEEL proposed actions outstanding. That is, decisions were deferred .pending further project definition, funding priorities, or appropriate review under NEPA" In May 2000 a team of DOE-ID program representatives and subject area technical specialists (interdisciplinary

363

NSLS Committees | Proposal Oversight Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Oversight Panel Charge Assume responsibility for completing any missing third reviews of the regular Proposal Review Panels. Review proposals with large rating...

364

Proposals for Structural Biology Beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals for Structural Biology Beamlines Proposals for Structural Biology Beamlines Print Tuesday, 01 June 2010 09:52 Submit a New Proposal for Structural Biology Beamlines...

365

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

366

EIS(DOE/EIS-0285/SA-61) Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2002 April 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-61 Tom Murphy - TFS/Bell-1 - Natural Resource Specialist Proposed Action: Vegetation Management along the Bell-Boundary No.3, 84/4 to 96/1 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 100 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Stevens and Pend Oreille County, WA, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-

367

(DOE/EIS-0285/SA-114): Supplement Analysis for the Transmission System Vegetation Management Program EIS (Chehalis-Raymond #1, ADNO 8114) 12/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December December 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-114) (Chehalis-Raymond #1, ADNO 8114) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Chehalis-Raymond #1 115 kV transmission line Location: Project location is within Lewis and Pacific counties, Washington and is within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources

368

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-181- Noxon-Hot Springs/Taft-Hot Springs 39/2 to 44/1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2003 2, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-34) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Asotin Creek Watershed, Washington-Schlee Acquisition Project No: 1996-094-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Asotin County, Washington Proposed by: Bonneville Power Administration (BPA) and Washington Department of Fish and Wildlife (WDFW) Description of the Proposed Action: BPA proposes to fund the acquisition of approximately 8,500 acres consisting of shrub-steppe rangeland, 1,480 acres of Conservation Reserve Program

369

Project Management Resources | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance Office of Engineering and Construction Management (OECM) Monthly Project Dashboard Project Management Resources DOE Office of Environmental Management Project & Contract Management Improvement Timeline Project Management Approach Using Earned Value Management Root Cause Analysis and Corrective Actions Plan DOE Order 413.3B DOE Directives OMB Capital Programming Guide OECM Project Management Career Development Program OECM Project Management Policy and Guidance per Office of Management Project Definition Rating Index (PDRI) Project Management Institute (PMI) Construction Industry Institute (CII)

370

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18954 18954 Vol. 76, No. 66 Wednesday, April 6, 2011 DEPARTMENT OF ENERGY 5 CFR Chapters XXIII and XXIV 10 CFR Chapters II, III, and X 18 CFR Chapter I 41 CFR Chapter 109 48 CFR Chapter 9 Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information; extension of public comment period. SUMMARY: On February 3, 2011, the Department of Energy (DOE) published a request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review.'' This document announces that the period for submitting reply comments is extended to April 15, 2011. The February 3 document incorrectly published in the Notices section of the Federal Register.

371

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31548 31548 Vol. 77, No. 103 Tuesday, May 29, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of extension of public comment period. SUMMARY: This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' is extended to June 19, 2012. DATES: DOE will accept comments, data, and information regarding the RFI received no later than June 19, 2012. ADDRESSES: Interested persons are encouraged to submit comments, identified by ''Regulatory Burden RFI,'' by any of the following methods:

372

Proposed Rules Federal Register  

NLE Websites -- All DOE Office Websites (Extended Search)

43015 43015 Vol. 77, No. 141 Monday, July 23, 2012 DEPARTMENT OF ENERGY 10 CFR Part 431 [Docket No. EERE-2010-BT-STD-0027] RIN 1904-AC28 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of public meeting and availability of preliminary technical support document. SUMMARY: The U.S. Department of Energy (DOE or Department) will hold a public meeting to discuss and receive comments on the following: the equipment classes DOE plans to analyze for the purpose of amending energy conservation standards for certain commercial and industrial electric motors under section 342(b) of the

373

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

75798 75798 Vol. 76, No. 233 Monday, December 5, 2011 DEPARTMENT OF ENERGY 5 CFR Chapter XXIII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. The purpose of DOE's review is to make the agency's regulatory program more effective and less burdensome in achieving its

374

Guidance Regarding Actions That May Proceed During the National Environmental Policy Act (NEPA) Process: Interim Actions (6/17/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exhibit 3 Exhibit 3 Steps to Follow for Determining Whether Actions May Proceed During the NEPA Process: Interim Actions Would the Interim Action Prejudice the Ultimate Programmatic Decision (i.e., would it tend to determine subsequent development or Limit alternatives)? Is the Proposed Interim Action Within the Scope of a Programmatic or Project-Specific EIS that is Being Prepared? Is the EIS Programmatic in Nature? (If proposed interim action is covered by a CX or EA/FONSI,see footnote 4, page 4, of text) Provisions of 40 CFR 1506.1 Do Not Apply: Follow Normal DOE NEPA Review and Documentation Procedures No Yes No No Would the Interim Action Have An Adverse Impact? Would the Interim Action Limit the Choice of Reasonable Alternatives (e.g., by level of resources

375

Preventive Action Number:  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

376

Computer aided research in managing educational process  

Science Conference Proceedings (OSTI)

In the process of action research are trying to gather quantitative facts, as well as other empirical research. This, however, is basic and primary goal of action research. Action research is largely based on qualitative factors. Paradigm of action research ... Keywords: eduacation, informaiional technology, internet, management, physical education, research

Danimir Mandic; Veljko Bandjur; Nenad Lalic; Dragan Martinovic

2010-07-01T23:59:59.000Z

377

May 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

378

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) (5/20/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) Joe DeHerrera Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Eisminger/ CREP Dike Relocation Project No: 1992-026-01 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 2.1 Maintain Healthy Riparian Plant Communities, 2.3 Creation of Wetlands to Provide Near Channel Habitat and Store Water for Land Use, 2.7 Avoid Exotic Species, 2.4 Provide Filter Strips to Catch Sediment and Other Pollutants, 6.1 Deferred Grazing. Location: Union County, Oregon

379

(DOE/EIS-0265/SA-102): Supplement Analysis for the Watershed Management Program EIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-102) David Byrnes, KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Tributary Access and Habitat Program - Ellensburg Water Company/ Cooke Creek Diversion Project Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.5 Install Grade Control Structures and Check Dams; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.15 Fish Passage Enhancement - Fishways; 2.1 Maintain Healthy Riparian Plant Communities; 4.10 Water Conveyance - Pipeline; 4.20 Water

380

DOE/EIS-0265-SA-166: Supplement Analysis for the Watershed Management Program EIS (8/6/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2004 6, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-166) Jay Marcotte Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Idaho Model Watershed Habitat Projects - Coleman Creek Fish Passage Restoration Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection Using Bioengineering Methods, 1.13 Culvert Removal/Replacement to Improve Fish Passage, 1.16 Spawning Habitat Enhancements, 2.6 Native Seed Inventories, 2.7 Avoid Exotic Species, 2.9 Mechanical Vegetation Removal, 4.2 Water Measuring

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-69) (11/15/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS, (DOE/EIS-0265/SA-69) Linda Hermeston - KEWL Fish and Wildlife Project Manager Proposed Action: Improvement of Anadromous Fish Habitat and Passage in Omak Creek Project No: 2000-001-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.6 Install Large Woody Debris Structures; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.9 Structural bank protection using bioengineering methods; 1.13 Culvert Removal/Replacement to improve fish passage; 1.16 Spawning habitat enhancements; 1.17 Rearing habitat enhancement.

382

Overview - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Help > Data Management Help > Data Management Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Overview Welcome to the data management pages for data providers to the ORNL Distributed Active Archive (DAAC). These pages provide an overview of data management planning and preparation and offer practical methods to successfully share and archive your data. Plan - write a short data management plan while preparing your research proposal, Manage - assign logical, descriptive file names, define the contents of your data files, and use consistent data values when preparing

383

Climate Action Plan (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

384

SEAB Climate Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

385

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley...

386

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2002 , 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91) Tom Morse, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat (Evans Creek Culvert Replacement) Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.13 Culvert removal/replacement to improve fish passage, 2.1 Maintain healthy riparian plant communities, 2.4 Provide filter strips to catch sediment and other pollutants, 2.6 Native seeds inventory, 2.7 Avoid exotic species, 7.2 Install hydraulic structures at low streamflows, 7.3 Minimize erosion

387

Guidance on NEPA Review for Corrective Actions under the Resource  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA Review for Corrective Actions under the Resource NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

388

Guidance on NEPA Review for Corrective Actions under the Resource  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance on NEPA Review for Corrective Actions under the Resource Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) Guidance on NEPA Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) This guidance results from the work of a Task Team formed by DOE's Environmental Management's NEPA Compliance Officer to study streamlining the NEPA process for RCRA corrective actions, in response to a recommendation in the National Academy of Sciences Report on "Improving the Environment: An Evaluation of DOE'S Environmental Management Program." Guidance on National Environmental Policy Act (NEPA) Review for Corrective Actions under the Resource Conservation and Recovery Act (RCRA) More Documents & Publications Application of NEPA to CERCLA and RCRA Cleanup Actions

389

Enforcement actions: Significant actions resolved reactor licensees. Semiannual progress report, July 1996--December 1996  

SciTech Connect

This compilation summarizes significant enforcement actions that have been resolved during the period (July-December 1996) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

NONE

1997-04-01T23:59:59.000Z

390

Enforcement actions: Significant actions resolved. Quarterly progress report, April--June 1993: Volume 12, No. 2  

Science Conference Proceedings (OSTI)

This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

Not Available

1993-09-01T23:59:59.000Z

391

SSRL- Proposal Review Panel  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Synchrotron Radiation Lab Stanford Synchrotron Radiation Lab search Go [an error occurred while processing this directive] Proposal Review Panel Sub Panels Structural Molecular Biology & Biophysics Materials 1: Structure, Reactivity & Self-Assembly Materials 2: Electronic Properties, Magnetic Properties & Surface Science Molecular Environmental & Interface Science Membership Torgny Gustafsson Rutgers University Dept of Physics & Astronomy 136 Frelinghuysen Rd Piscataway NJ 08854-0849 Victor Henrich Yale University Dept of Applied Physics 327 Becton Center, 15 Prospect St. New Haven CT 06511 Christopher P. Hill University of Utah Biochemistry 15 N. Medical Dr. East, Rm 4100 Salt Lake City, UT 84112-5650 Franz Himpsel University of Wisconsin Dept of Physics 1150 University Avenue

392

Physical Education Building Building Room Material Amount Percentage Priority Action  

E-Print Network (OSTI)

Physical Education Building Building Room Material Amount Percentage Priority Action Phys Ed Level Mechanical Insulation 250 LF 70.00 P6 Manage Phys Ed Level 1 East PE1H2 Pipe Fitting Mud 6 each 85.00 P5 #12;Building Room Material Amount Percentage Priority Action Phys Ed Level 2 West PE200 Pipe Fitting

Seldin, Jonathan P.

393

EIS-0218: Proposed Nuclear Weapons Nonproliferation Policy Concerning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18: Proposed Nuclear Weapons Nonproliferation Policy 18: Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel EIS-0218: Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel SUMMARY This study analyzes the potential environmental impacts of adopting a policy to manage foreign research reactor spent nuclear fuel containing uranium enriched in the United States. In particular, the study examines the comparative impacts of several alternative approaches to managing the spent fuel. The analysis demonstrates that the impacts on the environmental, workers and the general public of implementing any of the alternative management approaches would be small and within applicable Federal and state regulator limits. PUBLIC COMMENT OPPORTUNITIES

394

Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec...  

Open Energy Info (EERE)

management and infrastructure projects are already imbued with a culture of sustainability. Nevertheless, as the action plan indicates, Hydro-Qubec plans to harmonize...

395

Proposal Team: C. Burger  

NLE Websites -- All DOE Office Websites (Extended Search)

COMPLEX MATERIALS SCATTERING ( ) COMPLEX MATERIALS SCATTERING ( ) Proposal Team: C. Burger 1 , K. Cavicchi 2 , E. DiMasi 3 , A. Fluerasu 3 , S. Fraden 4 , M. Fukuto 3 , O. Gang 3 , B.S. Hsiao 1 , R.J. Kline 5 , S. Kumar 6 , O. Lavrentovich 6 , B. Ocko 3 , R. Pindak 3 , M. Rafailovich 1 , R.A. Register 7 , S. Sprunt 6 , H.H. Strey 1 , B.D. Vogt 8 , W.-L. Wu 5 , L. Wiegart 3 , K.G. Yager 3 1 Stony Brook University, 2 University of Akron, 3 Brookhaven National Lab, 4 Brandeis University, 5 NIST, 6 Kent State University, 7 Princeton University, 8 Arizona State University TECHNIQUES AND CAPABILITIES KEY CONCEPTS SELECTED APPLICATIONS * Small- and wide-angle x-ray scattering on 3PW source, in transmission and reflection mode: USAXS, SAXS, WAXS, GISAXS, GIXRD * High-throughput x-ray scattering for intelligent exploration of vast parameter spaces

396

Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production DOE/EA-1532 June 2005 National Nuclear Security Administration Sandia Site Office P.O. Box 5400 Albuquerque, New Mexico 87185-5400 Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production i Final EA DOE/EA-1532 June 2005 TABLE OF CONTENTS 1.0 PURPOSE AND NEED FOR AGENCY ACTION ........................................................................ 1 2.0 NO ACTION AND PROPOSED ACTION ALTERNATIVES...................................................... 2 2.1 No Action Alternative....................................................................................... 5

397

EA-1870: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

70: Mitigation Action Plan 70: Mitigation Action Plan EA-1870: Mitigation Action Plan Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The Department of Energy (DOE) issues this Mitigation Action Plan (MAP) in conjunction with its Finding of No Significant Impact as to the department's proposed action of providing costshared funding for the Utah Coal and Biomass Fueled Pilot Plant Project. Based on the analyses in the Environmental Assessment (DOE/EA-1870), DOE determined that its proposed action allowing Viresco Energy, LLC (Viresco) to use federal funding to design, construct and operate a coal and biomass gasification pilot plant (pilot plant) - would not result in any significant environmental impacts. The pilot plant would evaluate the technical feasibility of using steam hydrogasification to convert coal and biomass (such as agricultural

398

Business System Management Review  

NLE Websites -- All DOE Office Websites (Extended Search)

P-004 Business System Management Review Process 11_0304Page 1 of 7 P-004 Business System Management Review Process 11_0304Page 1 of 7 EOTA - Business Process Document Title: Business System Management Review Process Document Number: P-004 Rev 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-009, Business System Management Review Template P-004 Business System Management Review Process 11_0304Page 2 of 7 Revision History: Rev. Description of Change A Initial Release 08_0414 Corrective Actions, Preventive Actions, and Improvement Opportunity 09_1124 Edited document for clarity and to better fit the process in use. Added requirement to provide management with

399

DOE methods for evaluating environmental and waste management samples.  

SciTech Connect

DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) provides applicable methods in use by. the US Department of Energy (DOE) laboratories for sampling and analyzing constituents of waste and environmental samples. The development of DOE Methods is supported by the Laboratory Management Division (LMD) of the DOE. This document contains chapters and methods that are proposed for use in evaluating components of DOE environmental and waste management samples. DOE Methods is a resource intended to support sampling and analytical activities that will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the US Environmental Protection Agency (EPA), or others.

Goheen, S C; McCulloch, M; Thomas, B L; Riley, R G; Sklarew, D S; Mong, G M; Fadeff, S K [eds.; Pacific Northwest Lab., Richland, WA (United States)

1994-04-01T23:59:59.000Z

400

Corrective Action Tracking System (CATS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corrective Action Tracking System (CATS) Corrective Action Tracking System (CATS) Corrective Action Tracking System (CATS) The CATS web-based database is used to enter, track, and report the status of corrective actions developed and implemented in the DOE Corrective Action Management Program (CAMP) to effectively resolve and prevent recurrence of reported findings. The web-site includes guidance for accessing, reviewing and editing the database. NOTICE: Because of the potential sensitive nature of some information in Corrective Action Plans (CAPs) that is placed in the Department of Energy (DOE) Corrective Action Tracking System (CATS), DOE is limiting access to the CATS web site. Members of the public cannot access the CATS web site at this time. DOE regrets any inconvenience caused by this decision in

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EA-1779: Proposed Changes to the Sanitary Biosolids Land Application  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Proposed Changes to the Sanitary Biosolids Land 79: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Summary This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee. Base on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of NEPA, and that preparation of an environmental impact statement is not required.

402

DOE Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. The DOE Office of Environmental Management (EM) has put in place a "Roadmap" for Journey to Excellence that sets specific performance expectations for continuous improvements in contract and project management. Following are some highlights of EM's improvement actions over the past five years. In 2006, the National Academy of Public Administration (NAPA) began a study of EM, which included acquisition and project management among its key focus areas. The resultant report from the study,

403

Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84 84 Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia June 2002 U. S. Department of Energy Oak Ridge Operations Oak Ridge, Tennessee DOE/EA-1384 i TABLE OF CONTENTS Executive Summary.....................................................................................................................1 1. INTRODUCTION..................................................................................................................... 6 1.1 PREVIOUS ACTIONS ............................................................................................................................................. 6 1.2 SCOPE OF THIS PROPOSED ACTION..............................................................................................................

404

(DOE/EIS-0285/SA-11): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1) 1) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 150 feet. The proposed work will be accomplished in selected sections along the entire transmission line corridor. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with

405

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-Custer-Intalco #2) 4-Custer-Intalco #2) Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Custer-Intalco #2 230 kV transmission line located from tower structure 1/1 to 7/5. Location: Project location is in BPA Snohomish Region in Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way, along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

406

(DOE/EIS-0285/SA-125): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/18/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 (Echo Lake-Maple Valley #1 [Mile 1-9], Adno 8258) 5 (Echo Lake-Maple Valley #1 [Mile 1-9], Adno 8258) Don Atkinson - TFN/SNOHOMISH Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Echo Lake - Maple Valley #1 500 kV transmission line located from tower structure 1/1 to 9/2. Location: Project location is entirely within King county, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

407

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) (10/29/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2001 29, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) Alan Ruger Fish and Wildlife Project Manager Proposed Action: Duncan Creek Channel Rehabilitation Project Project No: 2001-053-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.11 Remove Debris Functioning as Barrier to Passage, 1.16 Spawning Habitat Enhancements, 2.1 Maintain Healthy Riparian Plant Communities, 2.9 Mechanical Vegetation Control. Location: Skamania County, Washington. Proposed by: Bonneville Power Administration (BPA), and the Washington State Department of Fish and Wildlife (WDFW)

408

Remedial action planning for Trench 1  

SciTech Connect

The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J. [Rocky Mountain Remediation Services, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Greengard, T. [Kaiser Hill/SAIC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Castaneda, N. [Dept. of Energy, Golden, CO (United States). Rocky Flats Environmental Technology Site

1998-07-01T23:59:59.000Z

409

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETFRMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETFRMINATION PROJECf TITLE; City of Mesa Reclamation Blower Units STATE: AZ Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number elO Number DE-EE0000840 GFO-o000840-OO2 0 Based on my review of the information concerning ahe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the Indoor concentratIOns of potentially harmful substances. These actions may Involve financial and technical assistance to IndiViduals (such as builders, owners, consultants, designers), organizations (such as utilities), and slate

410

EE RE PROJECT MANAG EMENT CENTER NEPA DETERr-IINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

>,RTr-lENT OF ENERGY >,RTr-lENT OF ENERGY EE RE PROJECT MANAG EMENT CENTER NEPA DETERr-IINATION Page 1 of2 RECIPIENT:North Carolina Department of Commerce. State Energy Office STATI<:: NC PROJECT TITLE: Energy Conservation Programs in Transportation - Sandhills Community Coliege Funding Opportunity Announcement Number Procurement Instrument Number DE-EEOOOO771 NEPA Control Number GFO-OOOO771-014 em Number o Based on my review or the infonnation concerning the proposed action, as NEPA Compliance Officer (autboriud under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

411

DEPARTMENT OFENFRGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIU.UNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFENFRGY OFENFRGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIU.UNATION RECIPIENT:$tate of Oklahoma PROJECT TITLE : gridSMART * Public Service Company of Oklahoma Page 1 of2 STATE: OK Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOOS2 EEOOOO133 GF0-0000133-047 EE133 Based on my review of tbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.lA}.1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to oonserve energy, demonstrate potential energy oonservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

412

ENT OFENFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFENFRGY OFENFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION REel PI ENT:Missouri Department of Natural Resources PROJECf TITLE : Noranda Page 1 of3 STATE: MO Funding Opportunity Announcement Number DE-FOAOOOOS2 Procurement Instrument Number NEPA Control Number CID Number EEOOOO131 EE131 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A),1 have made the following determination : ex, EA, [IS APPENDIX AND NUMBER: Description: B5. 1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy--efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

413

DFP.'\RTMENT OFFNFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DFP.'\RTMENT OFFNFRGY DFP.'\RTMENT OFFNFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION RECIPIENT:County of Lexington PROJECT TITLE: EECBG (S) Page 1 of2 STATE: SC Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number EE0000949 GFO-OOOQ949-001 0 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer- (authorized uDder DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities). and state

414

DEPART~IENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPART~IENT OF ENERGY DEPART~IENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT: Illinois Department of Commerce & Econom ic Opportunity PROJECT TITLE: Edwardsville CUSD 7 Solar Pholovoltaic Project Page 1 of2 STATE: IL Funding Opportunity Announcement Number DE-FOA-OOOOOS2 PrOCUNment Instrument Number NEPA Control Number CID Number o Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and tecrmical

415

DEPARTM ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

u.s. u.s. DEPARTM ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Page 1 of2 STATE: PA PROJECf TITLE : Lehigh County (PA), Geothermal al Trexler Enviromenlal Center -ARRA-EECBG Funding Opportunity AnnOUReement Number DE-FOA-OOOO13 Procurement Instrument Number DE-EEOOOO9361EECBG NEPA Control Number elD Number o Based on my .-eyiew or lbe infor mation concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination : ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actIOns may involve financial and technical

416

October 2005 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and DOE Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Recently Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 DOE Technical Standards Program

417

Standards Actions, July 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Program Document Status 07-01-2002 Activity Summary In Conversion - 4 In Preparation - 46 Out for Comment - 14 Published this Month - 2 5-year Review Status Revision in Progress - 11 Reaffirmation in Progress - 12 Cancellation Pending - 7 Cancellation in Progress - 1 No Current Action - 19 Inside this issue: DOE Technical Standards Projects Initiated 1 DOE Technical Standards Re- cently Sent for Coordination 1 DOE Technical Standards Re- cently Published 1 American National Standards Institute 2 American Society for Testing and Materials International 4 Visit the Technical Standards Program Web Site at http://tis.eh.doe.gov/techstds/. Standards Actions- July 2002 Standards Actions DOE Technical Standards Projects Initiated

418

Corrective Action Glossary  

SciTech Connect

The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations or remediations are also included.

Not Available

1992-07-01T23:59:59.000Z

419

Adaptive management: a paradigm for remediation of public facilities  

SciTech Connect

Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.

Janecky, David R [Los Alamos National Laboratory; Whicker, Jeffrey J [Los Alamos National Laboratory; Doerr, Ted B [NON LANL

2009-01-01T23:59:59.000Z

420

Price/Cost Proposal Form  

NLE Websites -- All DOE Office Websites (Extended Search)

PRICECOST PROPOSAL FORM Page No. of NREL Solicitation Document Number: Offeror's Name and Address: Title of Proposed Effort and Task No., Phase No., or Project Total, As...

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Original Workshop Proposal and Description  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Proposal and Description Visualization Requirements for Computational Science and Engineering Applications Proposal for a DoE Workshop to Be Held at the...

422

Proposals for Structural Biology Beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposals for Structural Biology Beamlines Print Submit a New Proposal for Structural Biology Beamlines Available Beamlines The beamlines suitable for structural biology...

423

EAC Recommendations for DOE Action Regarding Development of the Next  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of the Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System, approved at the October 15-16, 2012 EAC Meeting. EAC Recommendations for DOE Action on the Development of the Next Generation Grid Operating System - October 17, 2012 More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2012 - Monday, October 15, 2012 Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western

424

DOE/EIS-0285-SA-138: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Raver-Echo Lake #1) (4/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 (Raver-Echo Lake #1 8 (Raver-Echo Lake #1 Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Raver - Echo Lake #1 500 kV transmission line located from tower structure 4/1 to 13/1. Location: Project location is within King County, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way. BPA proposes to clear along access roads and remove danger trees outside the right-of-way where appropriate. Project is to remove vegetation that may impede the operation and maintenance of the subject transmission line. See Section 1.1 through 1.4 of the attached checklists for a complete description of the proposed action.

425

(DOE/EIS-0285/SA-112): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Ross-Alcoa 1&2, 3&4 and Bonneville-Alcoa 1&2) 10/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October October 15, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112-Ross-Alcoa 1&2, 3&4 and Bonneville Alcoa 1&2. Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV. Proposed by: Bonneville Power Administration (BPA). Location: Project location is within Clark County, Washington and is within the Olympia Region. Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: See the attached checklists

426

Proposed solar two project Barstow, California  

DOE Green Energy (OSTI)

This Environmental Assessment (EA) evaluates the environmental consequences of the proposed conversion and operation of the existing Solar One Facility in Daggett, Ca, near the city of Barstow, to a nitrate salt based heat transfer system, Solar Two. The EA also addresses the alternatives of different solar conversion technologies and alternative sites and discusses a no action alternative. A primary objective of the Solar Two Project is to demonstrate the technical and economic feasibility of a solar central receiver power plant using molten salt as the thermal storage and transport fluid medium. If successful, the information gathered from the Solar Two Project could be used to design larger commercial solar power plants.

Not Available

1994-01-01T23:59:59.000Z

427

(DOE/EIS-0285/SA-123): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/20/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2003 20, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123 Malin-Hilltop Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Malin-Hilltop (Structures 20/5-29/1). Location: The project area lies to the southeast of Klamath Falls, OR, and is located in Modoc County, California. Proposed by: Bonneville Power Administrationn (BPA) Description of the Proposed Action: Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on

428

DOE - Office of Legacy Management -- Pinellas  

Office of Legacy Management (LM)

and Recovery Act (RCRA) regulations. The site transferred to the Office of Legacy Management in 2004 and requires operation and maintenance of remedial action systems,...

429

DOE - Office of Legacy Management -- Fernald  

Office of Legacy Management (LM)

and Liability Act (CERCLA) regulations. The site transferred to the Office of Legacy Management in 2006 and requires operation and maintenance of remedial action systems,...

430

DOE - Office of Legacy Management -- Weldon  

Office of Legacy Management (LM)

and Liability Act (CERCLA) regulations. The site transferred to the Office of Legacy Management in 2003 and requires operation and maintenance of remedial action systems,...

431

u.s. DEPARThlENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT CENTER MANAGEMENT CENTER NEPA DETERMINATION RlCIPJENT:City of Bakersfield· EECBG PROJECT TITLE: City of Bakersfield 1 mega-watt solar energy facility at wastewater plant 3 Page 1 on STATE: CA Funding Opportunity Announc:trntnt Nurnbfor Procun~mcnt Instrument Number NEPA Control Number em Number EECBGIDE·FOA.QOOOO13 DE-EE0000862 G010337 Based on my nview oftbe inCormation (oDeeming the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the (ollowing determination: ex, EA, EIS APPENDlX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

432

.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA DETERlIIINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE PROJECT MANAG EERE PROJECT MANAG EMENT CENTER NEPA DETERlIIINATION R[CIPIENT:Nevada State Office of Energy Page 1 of3 STATE: NV PROJECT TITLE: Renewable Energy and Energy Efficien cy Revolving Loan Program · Avatar Energy - Desert Hills Dairy # 2 Funding Opportunity ,'nnOllnrement Number DE-FOA-OOOOOS2 Procurement Instrument Number DE-EE.(l()()()084 NEPA Control Number elD Number GF0..(X)()()()84-01Q EE84 Based on my review oftbt information concerning the proposed action, 3S NEPA ComplillnC't Offi<:e:r (authorized undcr DOE Order 451.IA), I have made the following determination: ex, EA , [IS APPENDIX AND NUMBER; Description: 85.1 Actions to conserve energy. demonstrate potential energy conservation, and promote energy-efficiency th at do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

433

u.s. DEPARTIIIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA D  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT CENTER MANAGEMENT CENTER NEPA D FTElUvIINATION RECIPIENT:Ohio Energy Office, Ohio Department of Development PROJECT TITLE : Making Efficiency Work Page 1 of3 STATE: OH Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-000052 DE-EE00165 GF0-09-142-003 GOO Based on my review of the information concerning the proposed action, as NEP A Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination : ex. EA, EIS APPENDIX AND NUMBER: Description : B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

434

U.S. DEPARTlIIENT OF ENERGY EERE PROJECT MANAG EMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAG MANAG EMENT CENTER NEPA DETERlIJINATION REC)PIENT;Louisiana DNR ** UL-UCLECO's Solar Thermal Power Plant Installation PROJECT TITLE: Recovery Act -. State Energy Program Page I of2 STATE: LA Funding Opportunity Announcement Number DE-FOA-OOOOOS2 Prl)(unment Instrument Number EEOOOO124 NEPA Control Number em Number o Baud on my review or the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA). I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially hannful substances. These actions may involve financial and technical

435

U.S. DEPARTlVIENT OF ENERGY (1.".01) EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(1.".01) EERE PROJECT MANAGEMENT CENTER (1.".01) EERE PROJECT MANAGEMENT CENTER NEPA DETERJMINATION RECIPIENT:Oklahoma Municipal Power Authority STATE: OK PROJECT OKLAHOMA SEP ARRA - OMPA Large System Application Request N TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000052 DE-EE0000133 GfO - QJOOi]3 -0d-.l 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

436

U.S. DEPARTME NT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT CENTER MANAGEMENT CENTER NFPA DETERMINATION Page 1 of 1 RECIPIENT:OK Department of Commerce STATE : OK PROJECT TITLE: City of Moore, OK EECBG eNG Project Modification· Sanitation Truck Purchase funding Opportunity Announcement Number DE EEOOOOO13 Procurement Instrument Number DE EEOOOOO13 NEPA Control Nu mber em Number o Based on my review oflhe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.1A),1 have made the (ollowlng dete rmination: ex, EA, EIS APPENDIX AND NUMBER: Description: 95.1 Actions to conserve energy. demonstrate potentia! energy conservation , and promote energy-efficiency thaI do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

437

Management Activities for Retrieved and Newly Generated Transuranic Wastes Savannah River Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 WL 253648 (F.R.) 8 WL 253648 (F.R.) NOTICES DEPARTMENT OF ENERGY Finding of No Significant Impact; Transuranic Waste Management Activities at the Savannah River Plant, Aiken, SC Tuesday, August 30, 1988 *33172 AGENCY: Department of Energy. ACTION: Finding of No Significant Impact. SUMMARY: The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -0315, for transuranic (TRU) waste management activities at DOE's Savannah River Plant (SRP), including the construction and operation of a new TRU Waste Processing Facility. Based on analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact

438

u.s. DEPARTl\oIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

oIENT OF ENERGY oIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIUvIINATION RECIPIENT:Golden Triangle Regional Solid Waste Management Authority PROJECT TITLE: EEC8G - Golden Triangle Power Plus Project page 1 ot L STATE: MS Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOO013 DE-EE0000763 GFO-O000763-003 0 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order45I.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

439

May 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

440

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

Note: This page contains sample records for the topic "manager proposed action" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Climate Action Plan (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

442

Climate Action Plan (Delaware)  

Energy.gov (U.S. Department of Energy (DOE))

The Delaware Climate Change Action Plan (DCCAP) was prepared with funding from the Delaware State Energy Office and the U.S. Environmental Protection Agencys State and Local Climate Change Program...

443

Climate Action Plan (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

On April 20, 2007, Governor Martin OMalley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to...

444

Purpose: To provide the Agreement States with the opportunity to comment on the proposed revisions to the Office of Federal and State Materials and Environmental Management Programs (FSME) Procedure SA-110, Reviewing the Non-Common Performance Indicator,  

E-Print Network (OSTI)

Background: Proposed revision of FSME Procedure SA-110 with tracked changes. Discussion: This document describes the procedure for conducting reviews of NRC and Agreement State uranium recovery program activities for the Non-Common Performance Indicator, Uranium Recovery Program. This procedure is being updated to reflect NRC organizational changes; current policies and procedures, and to provide clarifying guidance. Please provide your written comments on the draft revision of FSME Procedure SA-110 to the point of contact below. We would appreciate receiving your comments within 30 days from the date of this letter. If you have any questions regarding this communication, please contact me at 301-415-3340 or the individual named below.

Uranium Recovery Program; Robert J. Lewis

2009-01-01T23:59:59.000Z

445

Green Fund Proposal Guidelines March 15, 2010 UNBC GREEN FUND PROPOSAL GUIDELINES  

E-Print Network (OSTI)

. Anticipated implementation schedule by task. E. Budget i. Costs (overhead, salaries, materials, equipment). ii. Designation of project fund manager (can be the same as Team Leader). iii. Savings estimates for both and the proposal should be discussed beforehand with the GUPC by emailing the address above. B. Review Process

Northern British Columbia, University of

446

Proposed Strategy to meet DOE Order 231  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 Page 1 Proposed Strategy to meet DOE Order 231.1B, Preparation of Annual Site Environmental Reports Background The U.S. Department of Energy Office (DOE) of Legacy Management (LM) was established in 2003 to manage the Department's post-closure responsibilities at sites under LM's care and ensure the future protection of human health and the environment at those sites. The histories of the legacy sites vary, as does the regulatory regime under which the sites are managed. Long- term surveillance plans (LTSPs) are prepared for the majority of the sites. These LTSPs, which are available to the public, include site descriptions, information about site history, nature and extent of contamination, institutional controls, closeout condition of the site, present and future

447

Interim Action Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interim Action Determination Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national

448

DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Documents Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011) Second Five-Year Review Report for the Rocky Flats Site Corrective Action Decision/Record of Decision for Rocky Flats Plant (USDOE) Peripheral Operable Unit and Central Operable Unit Rocky Flats Environmental Technology Site Proposed Plan Present Landfill Monitoring and Maintenance Plan

449

The Standards Actions, February 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

standards project was recently can- standards project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Software Quality Assurance Requirements, Procedures, and Guidelines, Project QCIC-0008; Burton Rothleder, EH-31, 301- 903-3726, FAX 301-903-9523, Burton.Rothleder@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of these documents is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on these documents, please notify your TSM. • DOE Handbook Design Considerations, Project Number EDCN-0001; Richard Stark, EH-31; 301-903-4407, FAX 301-

450

DOE Standards Actions, November 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Projects Canceled DOE Projects Canceled The following DOE Technical Standards project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Worker Protection for Uranium Facilities, Project Number SAFT-0058; Peter O’Connell, EH-52; 301-903-5641, Peter .O’Connell@eh.doe.gov. This project was superceded by Guide of Good Practices for Oc- cupational Radiological Protec- tion in Uranium Facilities, Project Number SAFT-0072. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with copies for comment. The full text of these documents are available on the Technical Standards Pro- gram (TSP) Web Site at the URL shown at the bottom of this page.

451

The Standards Actions, August 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

standard project was recently can- standard project was recently can- celed. If you have any questions about this action, please contact the persons listed below. • Guidelines for Preparing Criti- cality Safety Evaluations at De- partment of Energy Non-Reac- tor Nuclear Facilities, Project Number SAFT-0069; Jerry McKamy, EH-34, 301-903-8031, Jerry. McKamy@hq.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Web Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Tritium Handling and Safe Storage, Project Number SAFT-0054;

452

The Standards Action - April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Canceled Projects Canceled The following DOE technical standard project was recently can- celed. If you have any questions about this action, please contact the person listed below. • Seismic Design and Evaluation Guidelines for High-Level Waste Storage Tanks, 6910-0035; Owen Thompson, EM-38, 301- 903-1926, FAX 301-903-7604, Owen.Thompson@em.doe.gov. DOE Technical Stan- dards Recently Sent for Coordination The appropriate Technical Stan- dards Managers (TSMs) will pro- vide selected reviewers with cop- ies for comment. The full text of this document is available on the Technical Standards Program (TSP) Internet Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. • Stabilization, Packaging, and Storage of Plutonium-Bearing

453

NNSA PERSONNEL SECURITY CLEARANCE ACTION REQUEST Required: SUBJECT INFORMATION  

NLE Websites -- All DOE Office Websites (Extended Search)

PERSONNEL SECURITY PERSONNEL SECURITY CLEARANCE ACTION REQUEST Required: SUBJECT INFORMATION Contractor Federal Name (Last, First, Middle): Suffix: Date of Birth: Social Security Number: Place of Birth (city and state/country): Citizenship(s): Email Address: Employer (legal name): Job Title: Required: LOCATION/BILLING Work Location: Contracting Office Location/SON: Prime Contract Number: Sub-contract Number: Facility Code: Employer Code: Required: CLEARANCE ACTION Requested Action(s): Clearance Level: (for employer/contract above) Clearance History Never held a clearance Previously held Currently holds Key Management Personnel (KMP)? Human Reliability Program (HRP)? PERSONNEL SECURITY USE ONLY: DOE Clearance: Special Access Program (SAP)? Yes No CLEARANCE JUSTIFICATION NARRATIVE

454

Implementation of the Formerly Utilized Sites Remedial Action Program:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation of the Formerly Utilized Sites Remedial Action Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) More Documents & Publications Recent Developments in DOE FUSRAP

455

(DOE/EIS-0265/SA-100): Supplement Analysis for the Watershed Management Program EIS 11/25/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 25, 2002 November 25, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-100) Tracey Yerxa TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Oregon Fish Screening Project, Screen Replacements 2003 Project No: 1993-066-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection; 1.9 Structural Bank Protection using Bio Engineering Techniques; 1.10 Structural Bank Protection using Engineering Structures; 1.14 Reduce Scour and Deposition at Hydraulic Structures; 1.15 Fish Passage Enhancement-Fishways; 1.16 Spawning Habitat Enhancements;