Powered by Deep Web Technologies
Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Phase 2 cost quality management assessment report for the Office of Technology Development (EM-50)  

SciTech Connect

The Office of Environmental Management (EM) Head quarters (HQ) Cost Quality Management Assessment (CQMA) evaluated the practices of the Office of Technology Development (EM-50). The CQMA reviewed EM-50 management documents and reported results in the HQ CQMA Phase 1 report (March 1993). In this Assessment Phase, EM-50 practices were determined through interviews with staff members. The interviews were conducted from the end of September through early December 1993. EM-50 management documents (Phase 1) and practices (Phase 2) were compared to the Performance Objectives and Criteria (POCs) contained in the DOE/HQ Cost Quality Management Assessment Handbook. More detail on the CQMA process is provided in section 2. Interviewees are listed in appendix A. Documents reviewed during Phase 2 are listed in appendix B. Section 3 contains detailed observations, discussions, and recommendations. A summary of observations and recommendations is presented.

Not Available

1994-08-01T23:59:59.000Z

2

Quality through Managed Improvement and Measurement (QMIM): Towards a Phased Development and Implementation of a Quality Management System for a Software Company  

Science Conference Proceedings (OSTI)

The paper describes results of a longitudinal study of developments in the area of software product and process quality improvement within a Hungarian software company, IQSOFT Ltd. This company has been active in this area since 1993, trying to build, ... Keywords: improvement, longitudinal case study, measurement, product and process quality, quality management system

Katalin Balla; Theo Bemelmans; Rob Kusters; Jos Trienekens

2001-11-01T23:59:59.000Z

3

Nuclear Concrete Materials Database Phase I Development  

Science Conference Proceedings (OSTI)

The FY 2011 accomplishments in Phase I development of the Nuclear Concrete Materials Database to support the Light Water Reactor Sustainability Program are summarized. The database has been developed using the ORNL materials database infrastructure established for the Gen IV Materials Handbook to achieve cost reduction and development efficiency. In this Phase I development, the database has been successfully designed and constructed to manage documents in the Portable Document Format generated from the Structural Materials Handbook that contains nuclear concrete materials data and related information. The completion of the Phase I database has established a solid foundation for Phase II development, in which a digital database will be designed and constructed to manage nuclear concrete materials data in various digitized formats to facilitate electronic and mathematical processing for analysis, modeling, and design applications.

Ren, Weiju [ORNL; Naus, Dan J [ORNL

2012-05-01T23:59:59.000Z

4

Suspect Counterfeit Items Criteria Review and Approach Document , Phase 1 - Management - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Suspect/Counterfeit Items Suspect/Counterfeit Items Criteria Review and Approach Document (CRAD) NNSA/Nevada Site Office Facility Representative Division Phase 1 - Management Performance Objective: Management should have a formal system under Quality Assurance with adequate controls defined and implemented to identify and preclude Suspect/Counterfeit Items (S/CI) from being introduced into safety systems and applications that create potential hazards. CRITERIA: Management should have a formal system of controls in place for assurance that all items procured meet the requirements for their intended use. Management should have a system of mechanisms to continuously maintain current, accurate, updated information on SC/Is and associated suppliers using all available sources. Management should have a training program with detailed records that

5

Nuclear Asset Management Database: Phase 2: Prototype Long-term Asset Management Database (LAMDA)  

Science Conference Proceedings (OSTI)

EPRI members engaged in nuclear asset management (NAM) and life cycle management (LCM) view quality equipment reliability and cost data as one of the highest priority needs in a market-driven industry, but less data are available for equipment important to generation than for safety equipment addressed in probabilistic risk assessment (PRA). This interim report describes the second phase of development of the Long-term Asset Management Database (LAMDA).

2004-12-21T23:59:59.000Z

6

CRAD, Management - Idaho Accelerated Retrieval Project Phase II |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management - Idaho Accelerated Retrieval Project Phase II Management - Idaho Accelerated Retrieval Project Phase II CRAD, Management - Idaho Accelerated Retrieval Project Phase II February 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Management at the Idaho National Laboratory, Idaho Accelerated Retrieval Project Phase II. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Management - Idaho Accelerated Retrieval Project Phase II More Documents & Publications CRAD, Emergency Management - Idaho Accelerated Retrieval Project Phase II

7

CRAD, Emergency Management - Idaho Accelerated Retrieval Project Phase II |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Idaho Accelerated Retrieval Project Emergency Management - Idaho Accelerated Retrieval Project Phase II CRAD, Emergency Management - Idaho Accelerated Retrieval Project Phase II February 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Emergency Management program at the Idaho National Laboratory, Idaho Accelerated Retrieval Project Phase II. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Emergency Management - Idaho Accelerated Retrieval Project Phase II More Documents & Publications CRAD, Emergency Management - Los Alamos National Laboratory TA 55 SST

8

Geothermal Development Phases | Open Energy Information  

Open Energy Info (EERE)

search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Phases of a Geothermal Development...

9

Geothermal Development Phases | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Geothermal Development Phases Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field...

10

Phase distribution of software development effort  

Science Conference Proceedings (OSTI)

Effort distribution by phase or activity is an important but often overlooked aspect compared to other steps in the cost estimation process. Poor effort allocation is among the major root causes of rework due to insufficiently resourced early activities. ... Keywords: cost estimation, development type, effort allocation, effort distribution, estimation accuracy, phase distribution

Ye Yang; Mei He; Mingshu Li; Qing Wang; Barry Boehm

2008-10-01T23:59:59.000Z

11

Technology Management Benchmark Study - Phase 2: Volume 2 - Detailed Report  

Science Conference Proceedings (OSTI)

EPRI and eleven U.S. domestic power companies participated in a benchmark study of the most successful technology management practices of leading non-utility companies. This report contains the detailed findings of the Technology Management Best Practices Study -- Phase 2 conducted from July 2001 to May 2002.

2002-06-27T23:59:59.000Z

12

Advanced Simulation Capability for Environmental Management (ASCEM) Phase II Demonstration  

SciTech Connect

In 2009, the National Academies of Science (NAS) reviewed and validated the U.S. Department of Energy Office of Environmental Management (EM) Technology Program in its publication, Advice on the Department of Energy’s Cleanup Technology Roadmap: Gaps and Bridges. The NAS report outlined prioritization needs for the Groundwater and Soil Remediation Roadmap, concluded that contaminant behavior in the subsurface is poorly understood, and recommended further research in this area as a high priority. To address this NAS concern, the EM Office of Site Restoration began supporting the development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific approach that uses an integration of toolsets for understanding and predicting contaminant fate and transport in natural and engineered systems. The ASCEM modeling toolset is modular and open source. It is divided into three thrust areas: Multi-Process High Performance Computing (HPC), Platform and Integrated Toolsets, and Site Applications. The ASCEM toolsets will facilitate integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. During fiscal year 2012, the ASCEM project continued to make significant progress in capabilities development. Capability development occurred in both the Platform and Integrated Toolsets and Multi-Process HPC Simulator areas. The new Platform and Integrated Toolsets capabilities provide the user an interface and the tools necessary for end-to-end model development that includes conceptual model definition, data management for model input, model calibration and uncertainty analysis, and model output processing including visualization. The new HPC Simulator capabilities target increased functionality of process model representations, toolsets for interaction with the Platform, and model confidence testing and verification for quality assurance. The Platform and HPC capabilities are being tested and evaluated for EM applications through a suite of demonstrations being conducted by the Site Applications Thrust. In 2010, the Phase I Demonstration focused on testing initial ASCEM capabilities. The Phase II Demonstration, completed in September 2012, focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site Deep Vadose Zone (BC Cribs) served as an application site for an end-to-end demonstration of ASCEM capabilities on a site with relatively sparse data, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations included in this Phase II report included addressing attenuation-based remedies at the Savannah River Site F-Area, to exercise linked ASCEM components under data-dense and complex geochemical conditions, and conducting detailed simulations of a representative waste tank. This report includes descriptive examples developed by the Hanford Site Deep Vadose Zone, the SRS F-Area Attenuation-Based Remedies for the Subsurface, and the Waste Tank Performance Assessment working groups. The integrated Phase II Demonstration provides test cases to accompany distribution of the initial user release (Version 1.0) of the ASCEM software tools to a limited set of users in 2013. These test cases will be expanded with each new release, leading up to the release of a version that is qualified for regulatory applications in the 2015 time frame.?

Freshley, M.; Hubbard, S.; Flach, G.; Freedman, V.; Agarwal, D.; Andre, B.; Bott, Y.; Chen, X.; Davis, J.; Faybishenko, B.; Gorton, I.; Murray, C.; Moulton, D.; Meyer, J.; Rockhold, M.; Shoshani, A.; Steefel, C.; Wainwright, H.; Waichler, S.

2012-09-28T23:59:59.000Z

13

GEA Development Phases | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » GEA Development Phases Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home GEA Development Phases The information for this page was taken directly from Geothermal Reporting Terms and Definitions: A Guide to Reporting Resource Development Progress and Results to the Geothermal Energy Association (GEA, November 2010) Gea.jpg The Geothermal Energy Association's (GEA) Geothermal Reporting Terms and Definitions are a guideline for geothermal developers to use when submitting geothermal resource development information to GEA for public dissemination in its annual US Geothermal Power Production and Development

14

Materials Development and Degradation Management for Nuclear ...  

Science Conference Proceedings (OSTI)

Materials Development and Degradation Management for Nuclear ... of zirconium alloys in reactor can lead to the presence of hydride precipitates, and can ... for the U.S. Department ofEnergy's National Nuclear Security Administration under ...

15

Technical considerations in materials management policy development  

Science Conference Proceedings (OSTI)

Under the Materials-in-Inventory (MIN) initiative, US DOE intends to develop policies to ensure that materials are managed and use efficiently, cost-effectively, and safely throughout DOE. The MIN initiative covers depleted uranium, scrap metals, chemicals, explosives, spent nuclear fuel, lead, alkali metals, etc.; by far the largest component is depleted uranium hexafluoride (DUF6). A technically defensible approach has been developed and is being used to select a long-term management strategy for DOE`s DUF6 inventory. The same approach can be adapted to management of other materials in inventory that have the potential to be reutilized.

Avci, H.; Goldberg, M.

1996-05-01T23:59:59.000Z

16

Technology development for DOE SNF management  

SciTech Connect

This paper describes the process used to identify technology development needs for the same management of spent nuclear fuel (SNF) in the US Department of Energy (DOE) inventory. Needs were assessed for each of the over 250 fuel types stores at DOE sites around the country for each stage of SNF management--existing storage, transportation, interim storage, and disposal. The needs were then placed into functional groupings to facilitate integration and collaboration among the sites.

Hale, D.L. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Einziger, R.E. [Pacific Northwest National Lab., Richland, WA (United States); Murphy, J.R. [Westinghouse Savannah River Co., Aiken, SC (United States)

1995-12-31T23:59:59.000Z

17

Developing a Motor Management Policy at BASF  

E-Print Network (OSTI)

In early 1998 Thomas R. Theising, BASF Corporate Engineering initiated the formation of a motor management team. The goal of the team was to develop a Motor Management Guideline to better manage the purchase and repair of motors used throughout the company. BASF draws a 240MW electrical power load. Accepting that 70% (industry standards range from 63 to 75% for BASF's businesses) of this load was consumed by rotating equipment and assuming an average cost of$401MWh at 8400 hours of annual operation BASF spends over $56M annually to operate electric motors. A guideline to better manage the purchase and repair of these motors could reduce this operating cost by 3 to 5%, which translates to $1.7M to $2.8M annually. An estimated total cost to BASF for implementation is $200K. The development of a Motor Management Guideline required the cooperative effort of a team of individuals. This team consisted of representatives from several BASF manufacturing locations, Corporate Engineering, Corporate Purchasing and Energy Management. Also, BASF included representatives from Duke Power and from Advanced Energy (AE). Advanced Energy had previously provided motor testing services to the BASF facility in Enka, NC.

Zickefoose, B.; Theising, T. R.

2001-05-01T23:59:59.000Z

18

Bureau of Land Management Oil Shale Development  

E-Print Network (OSTI)

Bureau of Land Management Oil Shale Development Unconventional Fuels Conference University of Utah May 17, 2011 #12;#12;Domestic Oil Shale Resources Primary oil shale resources in the U.S. are in the Green River Formation in Wyoming, Utah, and Colorado. 72 % of this oil shale resource is on Federal

Utah, University of

19

ICPP Waste Management Technology Development Program  

SciTech Connect

As a result of the decision to curtail reprocessing at the Idaho Chemical Processing Plant (ICPP), a Spent fuel and Waste Management Technology Development plan has been implemented to identify acceptable options for disposing of the (1) sodium-bearing liquid radioactive waste, (2) radioactive calcine, and (3) irradiated spent fuel stored at the Idaho National Engineering Laboratory (INEL). The plan was developed jointly by DOE and WINCO.

Hogg, G.W.; Olson, A.L.; Knecht, D.A. [Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States); Bonkoski, M.J. [USDOE, Washington, DC (United States)

1993-01-01T23:59:59.000Z

20

Category:GEA Development Phases | Open Energy Information  

Open Energy Info (EERE)

Phase III - Permitting and Initial Development Phase IV - Resource Production and Power Plant Construction Retrieved from "http:en.openei.orgwindex.php?titleCategory:G...

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Phase III - Permitting and Initial Development | Open Energy Information  

Open Energy Info (EERE)

III - Permitting and Initial Development III - Permitting and Initial Development Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home GEA Development Phase III: Permitting and Initial Development GEA Development Phases The Geothermal Energy Association's (GEA) Geothermal Reporting Terms and Definitions are a guideline for geothermal developers to use when submitting geothermal resource development information to GEA for public dissemination in its annual US Geothermal Power Production and Development Update. GEA's Geothermal Reporting Terms and Definitions serve to increase the consistency, accuracy, and reliability of industry information presented in the development updates. Phase I - Resource Procurement and Identification Phase II - Resource Exploration and Confirmation Phase III - Permitting and Initial Development

22

Development of an Integrated Distribution Management System  

Science Conference Proceedings (OSTI)

This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

Schatz, Joe E.

2010-10-20T23:59:59.000Z

23

Greening academia: Developing sustainable waste management at Higher Education Institutions  

Science Conference Proceedings (OSTI)

Higher Education Institutions (HEIs) are often the size of small municipalities. Worldwide, the higher education (HE) sector has expanded phenomenally; for example, since the 1960s, the United Kingdom (UK) HE system has expanded sixfold to >2.4 million students. As a consequence, the overall production of waste at HEIs throughout the world is very large and presents significant challenges as the associated legislative, economic and environmental pressures can be difficult to control and manage. This paper critically reviews why sustainable waste management has become a key issue for the worldwide HE sector to address and describes some of the benefits, barriers, practical and logistical problems. As a practical illustration of some of the issues and problems, the four-phase waste management strategy developed over 15 years by one of the largest universities in Southern England - the University of Southampton (UoS) - is outlined as a case study. The UoS is committed to protecting the environment by developing practices that are safe, sustainable and environmentally friendly and has developed a practical, staged approach to manage waste in an increasingly sustainable fashion. At each stage, the approach taken to the development of infrastructure (I), service provision (S) and behavior change (B) is explained, taking into account the Political, Economic, Social, Technological, Legal and Environmental (PESTLE) factors. Signposts to lessons learned, good practice and useful resources that other institutions - both nationally and internationally - can access are provided. As a result of the strategy developed at the UoS, from 2004 to 2008 waste costs fell by around Pounds 125k and a recycling rate of 72% was achieved. The holistic approach taken - recognizing the PESTLE factors and the importance of a concerted ISB approach - provides a realistic, successful and practical example for other institutions wishing to effectively and sustainably manage their waste.

Zhang, N. [School of Civil Engineering and the Environment, University of Southampton, University Rd., Highfield, Southampton, Hampshire SO17 1BJ (United Kingdom); Williams, I.D., E-mail: idw@soton.ac.uk [School of Civil Engineering and the Environment, University of Southampton, University Rd., Highfield, Southampton, Hampshire SO17 1BJ (United Kingdom); Kemp, S. [School of Civil Engineering and the Environment, University of Southampton, University Rd., Highfield, Southampton, Hampshire SO17 1BJ (United Kingdom); Smith, N.F. [Estates and Facilities Management, University of Southampton, University Rd., Highfield, Southampton, Hampshire SO17 1BJ (United Kingdom)

2011-07-15T23:59:59.000Z

24

Alloy Phase Metastability and Microstructure Development  

Science Conference Proceedings (OSTI)

In these cases, the microstructure phase selection is directed initially by the ... Time-Dependent Processes in Pu Alloys: From Femtoseconds to Teraseconds ...

25

Developing a Training Program for Collection Managers  

E-Print Network (OSTI)

management Conclusion Essentially, the Task Force has reassessed and reorganized our training program

2002-01-01T23:59:59.000Z

26

Development of an International Standard for Energy Management  

E-Print Network (OSTI)

International interest in energy management is driving the development of an ISO management standard. The U.S. DOE is leading this effort in partnership with other countries. The speakers will describe the development of an international management standard for energy. The planned publication date is early 2011.

Meffert, B.; McKane, A.

2009-05-01T23:59:59.000Z

27

Magnesium Alloy Development Using Phase Equilibria Computation ...  

Science Conference Proceedings (OSTI)

The work illustrates the role of calculated phase diagrams, solidification paths ... AZ31 In-situ Analysis of the Tensile Deformation Mechanisms in Mg-1Mn-1Nd(wt. ... Electrochemical Investigation on Chlorine and Electrolyte Intercalation into ... K -38: Production of Mg-Ni Alloy by Consumable Cathode Molten Salt Electrolysis.

28

Product development risk management and the role of transparency  

E-Print Network (OSTI)

Risks in product development lead to schedule and cost over-runs and poor product quality. While numerous risk management frameworks have been published and research on specific risk management practices and methods has ...

Olechowski, Alison L. (Alison Louise)

2012-01-01T23:59:59.000Z

29

Federal Energy Management Program: Develop an Institutional Change Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Develop an Develop an Institutional Change Action Plan for Sustainability to someone by E-mail Share Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Facebook Tweet about Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Twitter Bookmark Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Google Bookmark Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Delicious Rank Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Digg Find More places to share Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on AddThis.com...

30

A phased approach to cooperative environmental management R&D projects with Russian institutes  

SciTech Connect

An important aspect of technology exchange between the US and the Former Society Union (FSU) countries is the identification and implementation of cooperative projects that are mutually beneficial. The US Department of Energy (DOE) and its national laboratories have established a four-phase approach to identify and further develop Russian technologies that could contribute to solving DOE environmental management problems. Following an initial screening and identification of potential technologies, the country-to-country interaction is formally initiated in the first phase through a small-scale pilot project study. This phase consists of an evaluation of the specific technology for DOE applications, and provides an opportunity for both US and Russian scientists and engineers to validate the use of the technology for a specific DOE requirement. The successful completion of this phase establishes the basis for continuing the technology development into the second phase, which includes laboratory testing in Russia. In the third phase, the technology is laboratory tested in the US, most likely at those DOE national laboratories having the capability and greatest interest in the particular technology area. The fourth and final phase consist of a commercialization process that establishes a partnership with a US business to finalize development of the technology and to prepare for implementation within the DOE complex. An example of this phased approach is a current high-level waste separation cooperative project between the Khlopin Radium Institute and the DOE through Sandia National Laboratories (SNL) and Science Applications International Corporation (SAIC). This effort has not only enhanced separations technology for the DOE, but has also provided an example of a working process for future cooperative projects.

Matalucci, R.V. [Sandia National Labs., Albuquerque, NM (United States); Albert, T.E. [Science Applications International Corp., Clearwater, FL (United States)

1994-10-01T23:59:59.000Z

31

Development of dam safety management system  

Science Conference Proceedings (OSTI)

Recently, we can see an increasing amount of dam damage or failure due to aging, earthquakes occurrence and unusual changes in weather. For this reason, dam safety is gaining more importance than ever before in terms of disaster management at a national ... Keywords: Dam safety, Dam safety issue, Dam safety management system, Field inspection, Instrumentation, Monitoring, Safety evaluation

Jesung Jeon; Jongwook Lee; Donghoon Shin; Hangyu Park

2009-08-01T23:59:59.000Z

32

ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT- CURRENT STATUS AND PHASE II DEMONSTRATION RESULTS  

SciTech Connect

The U.S. Department of Energy (USDOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Toolsets and High-Performance Computing (HPC) Multiprocess Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, toolsets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial toolsets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations, addressing attenuation-based remedies at the Savannah River Site F Area and performance assessment for a representative waste tank, illustrate integration of linked ASCEM capabilities and initial integration efforts with tools from the Cementitious Barriers Partnership.

Seitz, R.

2013-02-26T23:59:59.000Z

33

ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT – CURRENT STATUS AND PHASE II DEMONSTRATION RESULTS  

SciTech Connect

The U.S. Department of Energy (USDOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Toolsets and High-Performance Computing (HPC) Multiprocess Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, toolsets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial toolsets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations, addressing attenuation-based remedies at the Savannah River Site F Area and performance assessment for a representative waste tank, illustrate integration of linked ASCEM capabilities and initial integration efforts with tools from the Cementitious Barriers Partnership.

Seitz, Roger; Freshley, Mark D.; Dixon, Paul; Hubbard, Susan S.; Freedman, Vicky L.; Flach, Gregory P.; Faybishenko, Boris; Gorton, Ian; Finsterle, Stefan A.; Moulton, John D.; Steefel, Carl I.; Marble, Justin

2013-06-27T23:59:59.000Z

34

Quantifying Security in Secure Software Development Phases  

Science Conference Proceedings (OSTI)

Secure software is crucial in today’s software dependent world. However, most of the time, security is not addressed from the very beginning of a software development life cycle (SDLC), and it is only incorporated after the software has been developed. ...

Muhammad Umair Ahmed Khan; Mohammad Zulkernine

2008-07-01T23:59:59.000Z

35

Management of Biological Materials in Wastewater from Research & Development Facilities  

SciTech Connect

PNNL has developed and instituted a systematic approach to managing work with biological material that begins in the project planning phase and carries through implementation to waste disposal. This paper describes two major processes used at PNNL to analyze and mitigate the hazards associated with working with biological materials and evaluate them for disposal to the sewer, ground, or surface water in a manner that protects human health and the environment. The first of these processes is the Biological Work Permit which is used to identify requirements for handling, storing, and working with biological materials and the second is the Sewer Approval process which is used to evaluate discharges of wastewaters containing biological materials to assure they meet industrial wastewater permits and other environmental regulations and requirements.

Raney, Elizabeth A.; Moon, Thomas W.; Ballinger, Marcel Y.

2011-04-01T23:59:59.000Z

36

The Wide-area Energy Management System Phase 2 Final Report  

DOE Green Energy (OSTI)

The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resulting system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.

Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

2010-08-31T23:59:59.000Z

37

Risk And Risk Management In Geothermal Exploration And Development...  

Open Energy Info (EERE)

Up Search Page Edit with form History Facebook icon Twitter icon Risk And Risk Management In Geothermal Exploration And Development Jump to: navigation, search GEOTHERMAL...

38

EM's Development Program for New Managers/Supervisors Presentation  

Energy.gov (U.S. Department of Energy (DOE))

This development program provides new managers and supervisors with 80 hours of developmental activities during the first two years they are in a leadership position.

39

Developing and Implementing an Asset Health Management Program  

Science Conference Proceedings (OSTI)

In 2009, the Electric Power Research Institute's (EPRI's) Maintenance Management and Technology program worked with its member companies to develop an overview that described the functionality of a system health management program. Since that time, EPRI and its members have also worked on initiatives that focus on component health management and performance monitoring. To encompass these similar and integrated initiatives, EPRI has more recently focused on the broader concept of asset health management. ...

2011-12-22T23:59:59.000Z

40

Geothermal resources development project: Phase I  

DOE Green Energy (OSTI)

Generic and site specific issues and problems are identified that relate directly to geothermal development in California, including changes in the state permitting process, land use issues, coordination between state entities, and geothermal revenues from BLM leased lands. Also discussed are the formation of working groups, preparation of a newsletter, the economic incentives workshops, and recommendations for future actions. (MHR)

Not Available

1979-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan  

SciTech Connect

The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000.

CLARK, D.L.

1999-08-09T23:59:59.000Z

42

Manager Helps Washington County Develop Energy Efficiency Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manager Helps Washington County Develop Energy Efficiency Projects Manager Helps Washington County Develop Energy Efficiency Projects Manager Helps Washington County Develop Energy Efficiency Projects August 11, 2010 - 1:01pm Addthis An Energy Department grant funded Autumn Salamack's new job as resource conservation manager for Kitsap County, Washington, and the energy efficient windows framed behind her. | Photo courtesy of Kitsap County, WA | An Energy Department grant funded Autumn Salamack's new job as resource conservation manager for Kitsap County, Washington, and the energy efficient windows framed behind her. | Photo courtesy of Kitsap County, WA | Maya Payne Smart Former Writer for Energy Empowers, EERE Autumn Salamack's career moved in a welcome new direction when she became the resource conservation manager for Kitsap County, Washington, in

43

Development of small and powdery waste management  

Science Conference Proceedings (OSTI)

The actual world is facing a dilemma: to have in present a great welfare without any care concerning the future and the natural environment or the acceptance of the opportunity cost generated by adopting clean, green technologies or of those which fundamentally ... Keywords: pollution, products, pulverous waste, recovery, siderurgy, waste management

Socalici Ana; Harau Carmen; Heput Teodor; Ardelean Erika

2012-03-01T23:59:59.000Z

44

Property:GeothermalDevelopmentPhases | Open Energy Information  

Open Energy Info (EERE)

GeothermalDevelopmentPhases GeothermalDevelopmentPhases Jump to: navigation, search Property Name GeothermalDevelopmentPhases Property Type Page Pages using the property "GeothermalDevelopmentPhases" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + Geothermal/Power Plant + C CA-017-05-051 + Geothermal/Well Field + CA-170-02-15 + Geothermal/Exploration + CA-650-2005-086 + Geothermal/Exploration + CA-670-2010-CX + Geothermal/Exploration + CA-96062042 + Geothermal/Power Plant +, Geothermal/Well Field +, Geothermal/Transmission + D DOE-EA-1116 + Geothermal/Power Plant +, Geothermal/Well Field +, Geothermal/Transmission + DOE-EA-1621 + Geothermal/Power Plant + DOE-EA-1676 + Geothermal/Power Plant + DOE-EA-1733 + Geothermal/Well Field +

45

Development of a synthetic phase contrast imaging diagnostic  

E-Print Network (OSTI)

A “synthetic diagnostic” has been developed to calculate the expected experimental response of phase contrast imaging (PCI), a scattering diagnostic used to measure density fluctuations in laboratory plasmas, to a tokamak ...

Rost, Jon C.

46

Plains CO2 Reduction Partnership--Development Phase  

NLE Websites -- All DOE Office Websites (Extended Search)

Development Phase Development Phase Background As part of a comprehensive effort to assess options for sustainable energy systems, the U.S. Department of Energy has selected seven regional partnerships, through its Regional Carbon Sequestration Partnership (RCSP) initiative, to determine the best approaches for capturing and permanently storing carbon dioxide (CO 2 ), a greenhouse gas (GHG) which can contribute to global climate change. The partnerships are

47

Efficiency of critical incident management systems: Instrument development and validation  

Science Conference Proceedings (OSTI)

There is much literature in the area of emergency response management systems. Even so, there is in general a lacuna of literature that deals with the issue of measuring the effectiveness of such systems. The aim of this study is to develop and validate ... Keywords: Critical incident management system (CIMS), Decision support, Emergency response systems, Instrument, Measurement, Media richness theory, National incident management systems (NIMS), Validation

Jin Ki Kim; Raj Sharman; H. Raghav Rao; Shambhu Upadhyaya

2007-11-01T23:59:59.000Z

48

Los Alamos hybrid environment: an integrated development/configuration management system  

SciTech Connect

I present the details of a hybrid configuration management system that utilizes a commercial configuration management tool (Softool's Change and Configuration Control environment) to monitor and control the development of mission-critical software systems at the Los Alamos Weapons Neutron Research Facility. The hybrid system combines features of the VMS host operating system and elements of the tool environment to integrate a flexible development environment with a very powerful automated configuration management system. The features of this system are presented with particular emphasis on the benefits of the hybrid approach. The complementary nature of the constituent environments is described. Special attention is given the issues of operational tradeoffs, personnel interaction and utilization, management visibility and overall system performance. It is shown that by employing a special interface data structure, the hybrid environment supports a much higher level of automation (of both development and configuration management activities) than is realizable in either environment individually. Examples are provided to illustrate the extent to which development activities and all phases of configuration management can be automated under this system. It is shown that in the process of providing a rigorous configuration management environment, the system remains virtually transparent to software development personnel and actually enhances the programmer's capabilities.

Cort, G.

1984-01-01T23:59:59.000Z

49

Negotiating Boundaries. Configuration Management in Software DevelopmentTeams  

Science Conference Proceedings (OSTI)

Using case-study material from three small software development teams, this paper analyses the regionalisation of ’design spaces‘. Its main purpose is to understand problems and practices of cooperative work in such spaces. ’Configuration management‘ ... Keywords: Articulation work, CSCW, Configuration Management (CM), Empirical studies

Hilda Tellio?lu; Ina Wagner

1997-12-01T23:59:59.000Z

50

Solid waste management challenges for cities in developing countries  

SciTech Connect

Highlights: Black-Right-Pointing-Pointer Stakeholders. Black-Right-Pointing-Pointer Factors affecting performance waste management systems. Black-Right-Pointing-Pointer Questionnaire as Annex for waste management baseline assessment. - Abstract: Solid waste management is a challenge for the cities' authorities in developing countries mainly due to the increasing generation of waste, the burden posed on the municipal budget as a result of the high costs associated to its management, the lack of understanding over a diversity of factors that affect the different stages of waste management and linkages necessary to enable the entire handling system functioning. An analysis of literature on the work done and reported mainly in publications from 2005 to 2011, related to waste management in developing countries, showed that few articles give quantitative information. The analysis was conducted in two of the major scientific journals, Waste Management Journal and Waste Management and Research. The objective of this research was to determine the stakeholders' action/behavior that have a role in the waste management process and to analyze influential factors on the system, in more than thirty urban areas in 22 developing countries in 4 continents. A combination of methods was used in this study in order to assess the stakeholders and the factors influencing the performance of waste management in the cities. Data was collected from scientific literature, existing data bases, observations made during visits to urban areas, structured interviews with relevant professionals, exercises provided to participants in workshops and a questionnaire applied to stakeholders. Descriptive and inferential statistic methods were used to draw conclusions. The outcomes of the research are a comprehensive list of stakeholders that are relevant in the waste management systems and a set of factors that reveal the most important causes for the systems' failure. The information provided is very useful when planning, changing or implementing waste management systems in cities.

Abarca Guerrero, Lilliana, E-mail: l.abarca.guerrero@tue.nl [Built Environment Department, Eindhoven University of Technology, Den Dolech, 25612 AZ Eindhoven (Netherlands); Maas, Ger, E-mail: g.j.maas@tue.nl [Built Environment Department, Eindhoven University of Technology, Den Dolech, 25612 AZ Eindhoven (Netherlands); Hogland, William, E-mail: william.hogland@lnu.se [School of Natural Sciences, Linnaeus University, SE-391 82 Kalmar (Sweden)

2013-01-15T23:59:59.000Z

51

Development and Implementation of a Program Management Maturity Model  

SciTech Connect

In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

Hartwig, Laura; Smith, Matt

2008-12-15T23:59:59.000Z

52

EM's Development Program for New Managers/Supervisors  

Energy.gov (U.S. Department of Energy (DOE))

This development program provides new managers and supervisors with 80 hours of developmental activities during the first two years they are in a leadership position. The program meets OPM, DOE and...

53

Managing the integration of technology into the product development pipeline  

E-Print Network (OSTI)

Managing the integration of technology is a complex task in any industry, but especially so in the highly competitive automotive industry. Automakers seek to develop plans to integrate technology into their products such ...

Barretto, Eduardo F., 1971-

2005-01-01T23:59:59.000Z

54

Systems and Components Development Expertise [Nuclear Waste Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Systems and Components Systems and Components Development Expertise Nuclear Fuel Cycle and Waste Management Technologies Overview Modeling and analysis Unit Process Modeling Mass Tracking System Software Waste Form Performance Modeling Safety Analysis, Hazard and Risk Evaluations Development, Design, Operation Overview Systems and Components Development Expertise System Engineering Design Other Major Programs Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE Division on Flickr Nuclear Waste Management using Electrometallurgical Technology Systems and Components Development Expertise Bookmark and Share Electrorefiner The electrorefiner: an apparatus used for electrometallurgical treatment of spent nuclear fuel to facilitate storage and ultimate disposal. Click on

55

TIPSTER Text Phase II Configuration Management Plan Version1.2p 3June1996  

E-Print Network (OSTI)

for TIPSTER Configuration Management Phase I of the TIPSTER Text Program, including the Text Retrieval be reused in many applications on many platforms, is the purpose of the TIPSTER Text Phase II Program/CM configuration organizations for TIPSTER II. It also describes the CM roles and responsibilities of other program

56

DOE, Invensys Operations Management to Develop, Deploy Operator Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, Invensys Operations Management to Develop, Deploy Operator DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants December 10, 2012 - 12:00pm Addthis Washington, DC - A new U.S. Department of Energy (DOE) cooperative research and development agreement to develop, test, and deploy a dynamic simulator and operator training system (OTS) could eventually help commercialize important carbon capture technologies at the nation's power plants. The high-fidelity, real-time OTS for a generic supercritical once-through (SCOT) pulverized-coal power plant will be installed at the National Energy Technology Laboratory's (NETL's) Advanced Virtual Energy Simulation

57

Water Research Center Development—Technology Search (Phase 0)  

Science Conference Proceedings (OSTI)

As part of the Water Research Center (WRC) development effort, EPRI, Southern Company, and Southern Research Institute conducted more than 70 meetings, teleconferences, and webcasts with water/wastewater technology suppliers. These meetings were held to understand the infrastructure needed at the WRC in order to evaluate the range of water management processes of potential interest to the electricity generation industry. In the course of this activity, investigators also learned about many existing ...

2013-05-29T23:59:59.000Z

58

Sustainable Land Management Through Market-Oriented Commodity Development:  

Open Energy Info (EERE)

Sustainable Land Management Through Market-Oriented Commodity Development: Sustainable Land Management Through Market-Oriented Commodity Development: Case studies from Ethiopia Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Sustainable Land Management Through Market-Oriented Commodity Development: Case studies from Ethiopia Agency/Company /Organization: International Livestock Research Institute Sector: Land Focus Area: Agriculture Topics: Market analysis, Background analysis Resource Type: Publications, Lessons learned/best practices Website: mahider.ilri.org/bitstream/10568/2372/1/WP_21_final.pdf Country: Ethiopia UN Region: "Sub-Saharan Africa" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

59

Guideline for Developing and Managing an Infrared Thermography (IRT) Program  

Science Conference Proceedings (OSTI)

The Guideline for Developing and Managing an Infrared Thermography Program is an extension of a number of reports addressing the use and benefits of infrared thermography (IRT) as a diagnostic tool. This document expands on more of the technology's intricacies, as well as defining procedures for setting up a comprehensive IRT program.

2001-09-27T23:59:59.000Z

60

Managing license compliance in free and open source software development  

Science Conference Proceedings (OSTI)

License compliance in Free and Open Source Software development is a significant issue today and organizations using free and open source software are predominately focusing on this issue. The non-compliance to licenses in free and open source software ... Keywords: Compatibility analysis, Compliance management, Free and open source software, License compliance, Rights expression languages

G. R. Gangadharan; Vincenzo D'Andrea; Stefano Paoli; Michael Weiss

2012-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

PROGRESS ON GENERIC PHASE-FIELD METHOD DEVELOPMENT  

Science Conference Proceedings (OSTI)

In this report, we summarize our current collobarative efforts, involving three national laboratories: Idaho National Laboratory (INL), Pacific Northwest National Laboratory (PNNL) and Los Alamos National Laboatory (LANL), to develop a computational framework for homogenous and heterogenous nucleation mechanisms into the generic phase-field model. During the studies, the Fe-Cr system was chosen as a model system due to its simplicity and availability of reliable thermodynamic and kinetic data, as well as the range of applications of low-chromium ferritic steels in nuclear reactors. For homogenous nucleation, the relavant parameters determined from atomistic studies were used directly to determine the energy functional and parameters in the phase-field model. Interfacial energy, critical nucleus size, nucleation rate, and coarsening kinetics were systematically examined in two- and three- dimensional models. For the heteregoneous nucleation mechanism, we studied the nucleation and growth behavior of chromium precipitates due to the presence of dislocations. The results demonstrate that both nucleation schemes can be introduced to a phase-field modeling algorithm with the desired accuracy and computational efficiency.

Biner, Bullent; Tonks, Michael; Millett, Paul C.; Li, Yulan; Hu, Shenyang Y.; Gao, Fei; Sun, Xin; Martinez, E.; Anderson, D.

2012-09-26T23:59:59.000Z

62

PHASE I MATERIALS PROPERTY DATABASE DEVELOPMENT FOR ASME CODES AND STANDARDS  

SciTech Connect

To support the ASME Boiler and Pressure Vessel Codes and Standard (BPVC) in modern information era, development of a web-based materials property database is initiated under the supervision of ASME Committee on Materials. To achieve efficiency, the project heavily draws upon experience from development of the Gen IV Materials Handbook and the Nuclear System Materials Handbook. The effort is divided into two phases. Phase I is planned to deliver a materials data file warehouse that offers a depository for various files containing raw data and background information, and Phase II will provide a relational digital database that provides advanced features facilitating digital data processing and management. Population of the database will start with materials property data for nuclear applications and expand to data covering the entire ASME Code and Standards including the piping codes as the database structure is continuously optimized. The ultimate goal of the effort is to establish a sound cyber infrastructure that support ASME Codes and Standards development and maintenance.

Ren, Weiju [ORNL; Lin, Lianshan [ORNL

2013-01-01T23:59:59.000Z

63

Development of the RFID System for nuclear materials management.  

Science Conference Proceedings (OSTI)

Radio frequency identification (RFID) is one of today's most rapidly growing technologies in the automatic data collection industry. Although commercial applications are already widespread, the use of this technology for managing nuclear materials is only in its infancy. Employing an RFID system has the potential to offer an immense payback: enhanced safety and security, reduced need for manned surveillance, real-time access to status and event history data, and overall cost-effectiveness. The Packaging Certification Program (PCP) in the U.S. Department of Energy's (DOE's) Office of Environmental Management (EM), Office of Packaging and Transportation (EM-63), is developing an RFID system for nuclear materials management. The system consists of battery-powered RFID tags with onboard sensors and memories, a reader network, application software, a database server and web pages. The tags monitor and record critical parameters, including the status of seals, movement of objects, and environmental conditions of the nuclear material packages in real time. They also provide instant warnings or alarms when preset thresholds for the sensors are exceeded. The information collected by the readers is transmitted to a dedicated central database server that can be accessed by authorized users across the DOE complex via a secured network. The onboard memory of the tags allows the materials manifest and event history data to reside with the packages throughout their life cycles in storage, transportation, and disposal. Data security is currently based on Advanced Encryption Standard-256. The software provides easy-to-use graphical interfaces that allow access to all vital information once the security and privilege requirements are met. An innovative scheme has been developed for managing batteries in service for more than 10 years without needing to be changed. A miniature onboard dosimeter is being developed for applications that require radiation surveillance. A field demonstration of the RFID system was recently conducted to assess its performance. The preliminary results of the demonstration are reported in this paper.

Chen, K.; Tsai, H.; Liu, Y. Y. (Decision and Information Sciences)

2008-01-01T23:59:59.000Z

64

Electrochemical-thermal modeling and microscale phase change for passive internal thermal management of lithium ion batteries.  

SciTech Connect

A fully coupled electrochemical and thermal model for lithium-ion batteries is developed to investigate the impact of different thermal management strategies on battery performance. In contrast to previous modeling efforts focused either exclusively on particle electrochemistry on the one hand or overall vehicle simulations on the other, the present work predicts local electrochemical reaction rates using temperature-dependent data on commercially available batteries designed for high rates (C/LiFePO{sub 4}) in a computationally efficient manner. Simulation results show that conventional external cooling systems for these batteries, which have a low composite thermal conductivity ({approx}1 W/m-K), cause either large temperature rises or internal temperature gradients. Thus, a novel, passive internal cooling system that uses heat removal through liquid-vapor phase change is developed. Although there have been prior investigations of phase change at the microscales, fluid flow at the conditions expected here is not well understood. A first-principles based cooling system performance model is developed and validated experimentally, and is integrated into the coupled electrochemical-thermal model for assessment of performance improvement relative to conventional thermal management strategies. The proposed cooling system passively removes heat almost isothermally with negligible thermal resistances between the heat source and cooling fluid. Thus, the minimization of peak temperatures and gradients within batteries allow increased power and energy densities unencumbered by thermal limitations.

Fuller, Thomas F. (Georgia Institute of Technology, Atlanta, GA); Bandhauer, Todd (Georgia Institute of Technology, Atlanta, GA); Garimella, Srinivas (Georgia Institute of Technology, Atlanta, GA)

2012-01-01T23:59:59.000Z

65

Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2  

SciTech Connect

DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

CARTER, R.P.

2000-04-04T23:59:59.000Z

66

Zero Discharge Water Management for Horizontal Shale Gas Well Development  

NLE Websites -- All DOE Office Websites (Extended Search)

Discharge Water Management for Discharge Water Management for Horizontal Shale Gas Well Development Final Report Start Date: October 1, 2009 End Date: March 31, 2012 Authors: Paul Ziemkiewicz, PhD Jennifer Hause Raymond Lovett, PhD David Locke Harry Johnson Doug Patchen, PG Report Date Issued: June 2012 DOE Award #: DE-FE0001466 Submitting Organization: West Virginia Water Research Institute West Virginia University PO Box 6064 Morgantown, WV 26506-6064 FilterSure, Inc. PO Box 1277 McLean, VA 22101 ShipShaper, LLP PO Box 2 Morgantown, WV 26507 2 | P a g e Acknowledgment "This material is based upon work supported by the Department of Energy under Award Number DE-FE0001466." Disclaimer "This report was prepared as an account of work sponsored by an agency of the United States

67

Sodium Heat Engine Development Program. Phase 1, Final report  

DOE Green Energy (OSTI)

The Sodium Heat Engine (SHE) is an efficient thermoelectric conversion device which directly generates electricity from a thermally regenerative electrochemical cell that relies on the unique conduction properties of {beta}{double_prime}-alumina solid electrolyte (BASE). Laboratory models of a variety of SHE devices have demonstrated the feasibility and efficiency of the system, engineering development of large prototype devices has been slowed by a series of materials and fabrication problems. Failure of the electrolyte tubes has been a recurring problem and a number of possible causes have been postulated. To address these issues, a two-phase engineering development program was undertaken. This report summarizes the final results of the first phase of the program, which included extensive materials characterization activities, a study of applicable nondestructive evaluation methods, an investigation of possible stress states that would contribute to fracture, and certain operational issues associated with the electromagnetic pumps used in the SHE prototype. Mechanical and microstructural evaluation of commercially obtained BASE tubes revealed that they should be adequate for SHE applications and that sodium exposure produced no appreciable deleterious strength effects. Processing activities to produce a more uniform and smaller grain size for the BASE tubes were completed using isostatic pressing, extrusion, and slip casting. Green tubes were sintered by conventional and microwave plasma methods. Of particular interest is the residual stress state in the BASE tubes, and both analysis and nondestructive evaluation methods were employed to evaluate these stresses. X-ray and neutron diffraction experiments were performed to determine the bulk residual stresses in commercially fabricated BASE tubes; however, tube-to-tube variations and variations among the various methods employed did not allow formulation of a definitive definition of the as-fabricated stress state.

Singh, J.P.; Kupperman, D.S.; Majumdar, S.; Dorris, S.; Gopalsami, N.; Dieckman, S.L.; Jaross, R.A.; Johnson, D.L.; Gregar, J.S.; Poeppel, R.B.; Raptis, A.C.; Valentin, R.A.

1992-01-01T23:59:59.000Z

68

Organizational strategy development in distribution channel management using fuzzy AHP and hierarchical fuzzy TOPSIS  

Science Conference Proceedings (OSTI)

Distribution channel management not only consists of choosing distribution channels. In fact, probably the most difficult phase of the distribution management starts after this choice. Determining an appropriate organization strategy for distribution ... Keywords: Distribution channel management, Distribution organization, Extent analysis method, Fuzzy analytic hierarchy process, Hierarchical fuzzy TOPSIS

Turan Paksoy; Nimet Yapici Pehlivan; Cengiz Kahraman

2012-02-01T23:59:59.000Z

69

California Wind Energy Forecasting System Development and Testing Phase 2: 12-Month Testing  

Science Conference Proceedings (OSTI)

This report describes results from the second phase of the California Wind Energy Forecasting System Development and Testing Project.

2003-07-22T23:59:59.000Z

70

Developing an integrated ecological resource management and monitoring plan as part of an environmental management system  

SciTech Connect

Recent interest in defining the appropriate content of an Environmental Management System (EMS) as specified by ISO 14001 prompted a study to determine how ecological concerns should be integrated into an EMS and subsequently implemented. This paper describes an approach for developing objectives, targets, and processes for ecological resource management at those Department of Energy (DOE) facilities where an ecological resource management approach that goes beyond simple regulatory compliance is warranted. A major goal of this approach is to position DOE facilities so that they can proactively address ecological concerns, rather than being forced to respond retroactively to damage claims, restoration requirements, and/or bad publicity. Although DOE is not requiring ISO 14001 implementation at its facilities, it is recommending ISO 14001 as a voluntary approach to encourage good environmental practices, such as pollution prevention and sustainable development, by adopting an integrated systems approach. The DOE position is that existing DOE orders and policy statements are consistent with, and have elements of, the ISO 14001 EMS approach.

Michael, D.; Hooten, M. [Neptune and Co., Inc., Los Alamos, NM (United States); Kelly, E. [Los Alamos National Lab., NM (United States); Roy-Harrison, W. [USDOE, Washington, DC (United States)

1997-04-01T23:59:59.000Z

71

Concentrating Solar Power - Molten Salt Pump Development, Final Technical Report (Phase 1)  

DOE Green Energy (OSTI)

The purpose of this project is to develop a long shafted pump to operate at high temperatures for the purpose of producing energy with renewable resources. In Phase I of this three phase project we developed molten salt pump requirements, evaluated existing hardware designs for necessary modifications, developed a preliminary design of the pump concept, and developed refined cost estimates for Phase II and Phase III of the project. The decision has been made not to continue the project into Phases II and III. There is an ever increasing world-wide demand for sources of energy. With only a limited supply of fossil fuels, and with the costs to obtain and produce those fuels increasing, sources of renewable energy must be found. Currently, capturing the sun's energy is expensive compared to heritage fossil fuel energy production. However, there are government requirements on Industry to increase the amount of energy generated from renewable resources. The objective of this project is to design, build and test a long-shafted, molten salt pump. This is the type of pump necessary for a molten salt thermal storage system in a commercial-scale solar trough plant. This project is under the Department of Energy (DOE) Solar Energy Technologies Program, managed by the Office of Energy Efficiency and Renewable Energy. To reduce the levelized cost of energy (LCOE), and to meet the requirements of 'tomorrows' demand, technical innovations are needed. The DOE is committed to reducing the LCOE to 7-10 cents/kWh by 2015, and to 5-7 cents/kWh by 2020. To accomplish these goals, the performance envelope for commercial use of long-shafted molten salt pumps must be expanded. The intent of this project is to verify acceptable operation of pump components in the type of molten salt (thermal storage medium) used in commercial power plants today. Field testing will be necessary to verify the integrity of the pump design, and thus reduce the risk to industry. While the primary goal is to design a pump for a trough solar power plant system, the intent is for the design to be extensible to a solar power tower application. This can be accomplished by adding pumping stages to increase the discharge pressure to the levels necessary for a solar power tower application. This report incorporates all available conceptual design information completed for this project in Phase I.

Michael McDowell; Alan Schwartz

2010-03-31T23:59:59.000Z

72

Approaches To Crisis Prevention In Lean Product Development By High Performance Teams And Through Risk Management  

E-Print Network (OSTI)

This thesis investigates crisis prevention in lean product development, focusing on high performance teams and risk management methods.

Oehmen, Josef

73

AVESTAR® - AVESTAR Team and Invensys Operations Management To Develop  

NLE Websites -- All DOE Office Websites (Extended Search)

Natural Gas Combined Cycle (NGCC) Natural Gas Combined Cycle (NGCC) A simulator that can provide future engineers with realistic, hands-on experience for operating advanced natural gas combined cycle (NGCC) power plants will soon be available at an innovative U.S. Department of Energy training center. Under a new cooperative research and development agreement signed by the Office of Fossil Energy's National Energy Technology Laboratory (NETL) and Invensys Operations Management, the partners will develop, test, and deploy a dynamic simulator and operator training system (OTS) for a generic NGCC power plant equipped for use with post-combustion carbon capture. NETL will operate the new dynamic simulator/OTS at the AVESTAR (Advanced Virtual Energy Simulation Training and Research) Center in Morgantown, W.Va.

74

Developing Segmented Polyurethanes as Solid-solid Phase ...  

Science Conference Proceedings (OSTI)

Cellulose Acetate Membranes for CO2 Separation from Water-gas-shift Reaction ... Thermodynamic Phase Stability in Gasification Carbon Feedstock Slags ...

75

Development of KM System for Intergrated Management of Water Resources and Environment in Zhangweinan Subbasin, China  

Science Conference Proceedings (OSTI)

Knowledge Management (KM) system for Integrated Management of Water Resources and Environment is developed in the paper, which includes spatial database, properties database, thematic database and met abase. The database can be used for integrated management ... Keywords: Zhangweinan Subbasin, knowledge management system(KM), database

Weidong Yu; Chunhui Li; Junxiang Jia

2012-05-01T23:59:59.000Z

76

Prototype of knowledge management system in Chinese offshore software development company  

Science Conference Proceedings (OSTI)

This paper illustrates preliminary design and evaluation of a knowledge managing system in Chinese offshore software development company. The major features of the knowledge management system are a BBS style Q&A function, a management of Q&A results ... Keywords: association retrieval, knowledge management, question and answer system

Li Cai; Zuoqi Wang; Yufeng Jiao; Masanori Akiyoshi; Norihisa Komoda

2008-03-01T23:59:59.000Z

77

FreedomCAR Advanced Traction Drive Motor Development Phase I  

DOE Green Energy (OSTI)

The overall objective of this program is to design and develop an advanced traction motor that will meet the FreedomCAR and Vehicle Technologies (FCVT) 2010 goals and the traction motor technical targets. The motor specifications are given in Section 1.3. Other goals of the program include providing a cost study to ensure the motor can be developed within the cost targets needed for the automotive industry. The program has focused on using materials that are both high performance and low costs such that the performance can be met and cost targets are achieved. In addition, the motor technologies and machine design features must be compatible with high volume manufacturing and able to provide high reliability, efficiency, and ruggedness while simultaneously reducing weight and volume. Weight and volume reduction will become a major factor in reducing cost, material cost being the most significant part of manufacturing cost at high volume. Many motor technology categories have been considered in the past and present for traction drive applications, including: brushed direct current (DC), PM (PM) brushless dc (BLDC), alternating current (AC) induction, switched reluctance and synchronous reluctance machines. Of these machine technologies, PM BLDC has consistently demonstrated an advantage in terms of power density and efficiency. As rare earth magnet cost has declined, total cost may also be reduced over the other technologies. Of the many different configurations of PM BLDC machines, those which incorporate power production utilizing both magnetic torque as well as reluctance torque appear to have the most promise for traction applications. There are many different PM BLDC machine configurations which employ both of these torque producing mechanisms; however, most would fall into one of two categories--some use weaker magnets and rely more heavily on reluctance torque (reluctance-dominant PM machines), others use strong PMs and supplement with reluctance torque (magnet-dominant PM machines). This report covers a trade study that was conducted in this phase I program to explore which type of machine best suits the FCVT requirements.

Ley, Josh (UQM Technologies, Inc.); Lutz, Jon (UQM Technologies, Inc.)

2006-09-01T23:59:59.000Z

78

Restoration And Management Strategies Of Wetlands In Developing Countries  

E-Print Network (OSTI)

changing land use in the watershed area, pollution fromland use management, has also led to problems of pollution,

Ramachandra, T. V.

2001-01-01T23:59:59.000Z

79

Environmental guidelines for development of Cultural Resource Management plans. Final report  

Science Conference Proceedings (OSTI)

The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

NONE

1995-08-01T23:59:59.000Z

80

The Challenges of Developing and Integrating a Quality Management System in a Research and Development Organization  

SciTech Connect

Tailoring a quality management system to the specific needs of an organization is difficult to say the least. The existence of quality system models and standards help facilitate this process immensely. However, what does an organization do when its work is so unique that quality system models and standards do not exist for it? This and other obstacles are what the Nonproliferation, Arms Control, and International Security (NAI) Directorate at Lawrence Livermore National Laboratory (LLNL) encountered during strategic initiatives to develop and integrate a new quality management system. This paper will answer this question to help similar initiatives by: Introducing NAI and its unique mission, organization, history, culture and the security environment in which it operates; Examining the obstacles to designing and integrating NAI's quality management system; Discussing the steps taken to ensure success of the strategic quality initiatives; Presenting the quality management system and plan that resulted from these efforts; Presenting the improvements in NAI and LLNL that resulted from these strategic initiatives; and Presenting lessons learned and practical recommendations.

Ryan, E.; Werne, R.W.

2000-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

A theoretical framework of component-based software development phases  

Science Conference Proceedings (OSTI)

Component-Based Software Development (CBSD) is considered by many as the next revolution in systems development. Its focus is on the integration of pre-fabricated software components to build systems that increase portability and flexibility. CBSD purports ... Keywords: component-based software development, component-based software development life cycle, design science, systems development approach

Jason H. Sharp; Sherry D. Ryan

2010-02-01T23:59:59.000Z

82

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan  

SciTech Connect

This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition.

G. L. Schwendiman

2006-07-01T23:59:59.000Z

83

TEM Study on the Phase Development and Microstructure in a U-7 ...  

Science Conference Proceedings (OSTI)

Abstract Scope, Fuel development for the Reduced Enrichment for Research .... Characterization of the Delta Phase Formation in Uranium-Zirconium Alloy Fuels.

84

Developement of a digitally controlled low power single phase inverter for grid connected solar panel.  

E-Print Network (OSTI)

?? The work consists in developing a power conversion unit for solar panel connected to the grid. This unit will be a single phase inverter… (more)

Marguet, Raphael

2010-01-01T23:59:59.000Z

85

Methods of Managing Water in Oil Shale Development - Energy ...  

This invention is a system and method of providing water management and utilization during the process of dewatering and retorting of oil shale. More ...

86

The nal phase of dead-ice moraine development: processes and sediment architecture, Kotlujokull, Iceland  

E-Print Network (OSTI)

The ®nal phase of dead-ice moraine development: processes and sediment architecture, Ko of Copenhagen, éster Voldgade 10, DK-1350, Copenhagen K, Denmark ABSTRACT Consecutive phases of de-icing of ice on the sediment succession. Generally, no inversion of the topography occurs during the ®nal phase of de-icing

Ingólfsson, �lafur

87

Development of a methodology for defining whole-building energy design targets for commercial buildings: Phase 2, Development concept stage report  

Science Conference Proceedings (OSTI)

Since 1985, the Pacific Northwest Laboratory (PNL) has managed the Whole-Building Energy Design Targets project for the US Department of Energy (DOE) Office of Building Technologies (formerly the Office of Buildings and Community Systems). The primary focus of the Targets project is to develop a flexible methodology for buildings industry use in setting energy performance guidelines for commercial buildings and for determining compliance with those guidelines. The project is being conducted as a two-phase effort. In Phase 1, Planning, the project team determined the research that was necessary for developing the Targets methodology. In the concept stage of Phase 2, Development, the team sought to define the technical and software development concepts upon which the overall Targets methodology will be based. The concept stage work is documented in four volumes, of which this summary volume is the first. The three other volumes are Volume 2: Technical Concept Development Task Reports, Volume 3: Workshop Summaries, and Volume 4: Software Concept Development Task Reports. 8 refs., 14 figs.

Jones, J.W. (American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc., Atlanta, GA (USA)); Deringer, J.J. (American Inst. of Architects, Washington, DC (USA)); McKay, H.N. (Illuminating Engineering Society of North America, New York, NY (USA))

1990-09-01T23:59:59.000Z

88

Development of coherent Raman measurements of temperature in condensed phases  

SciTech Connect

We report theoretical considerations and preliminary data on various forms of coherent Raman spectroscopy that have been considered as candidates for measurement of temperature in condensed phase experiments with picosecond time resolution. Due to the inherent broadness and congestion of vibrational features in condensed phase solids, particularly at high temperatures and pressures, only approaches that rely on the ratio of anti-Stokes to Stokes spectral features are considered. Methods that rely on resolution of vibrational progressions, calibration of frequency shifts with temperature and pressure in reference experiments, or detailed comparison to calculation are inappropriate or impossible for our applications. In particular, we consider femtosecond stimulated Raman spectroscopy (FSRS), femtosecond/picosecond hybrid coherent Raman spectroscopy (multiplex CARS), and optical heterodyne detected femtosecond Raman induced Kerr Effect spectroscopy (OHD-FRIKES). We show that only FSRS has the ability to measure temperature via an anti-Stokes to Stokes ratio of peaks.

Mcgrane, Shawn D [Los Alamos National Laboratory; Dang, Nhan C [Los Alamos National Laboratory; Bolme, Cindy A [Los Alamos National Laboratory; Moore, David S [Los Alamos National Laboratory

2010-12-08T23:59:59.000Z

89

Development of mobile workforce management system for electricity supply industries  

Science Conference Proceedings (OSTI)

This research paper presents the features of a proposed Mobile Workforce Management System (MWMS) that will be used for the Electricity Supply Industries (ESI). The paper wraps up the types of related works that has been executed; the study on problems ... Keywords: electricity supply industry, mobile workforce management system

Faridah Hani Mohamed Salleh; Zaihisma Che Cob; Mohana Shanmugam; Siti Salbiah Mohamed Shariff

2009-12-01T23:59:59.000Z

90

Southeast Regional Carbon Sequestration Partnership--Development Phase  

NLE Websites -- All DOE Office Websites (Extended Search)

626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 412-386-4867 sean.plasynski@netl.doe.gov Bruce Brown Project Manager National EnergyTechnology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 412-386-5534 bruce.brown@netl.doe.gov Ken Nemeth Executive Director Southern States Energy Board 6325 Amherst Court Norcross, GA 30092 770-242-7712 nemeth@sseb.org PaRtnERS anD StaKEHoLDERS

91

Closure development for high-level nuclear waste containers for the tuff repository; Phase 1, Final report  

SciTech Connect

This report summarizes Phase 1 activities for closure development of the high-level nuclear waste package task for the tuff repository. Work was conducted under U.S. Department of Energy (DOE) Contract 9172105, administered through the Lawrence Livermore National Laboratory (LLNL), as part of the Yucca Mountain Project (YMP), funded through the DOE Office of Civilian Radioactive Waste Management (OCRWM). The goal of this phase was to select five closure processes for further evaluation in later phases of the program. A decision tree methodology was utilized to perform an objective evaluation of 15 potential closure processes. Information was gathered via a literature survey, industrial contacts, and discussions with project team members, other experts in the field, and the LLNL waste package task staff. The five processes selected were friction welding, electron beam welding, laser beam welding, gas tungsten arc welding, and plasma arc welding. These are felt to represent the best combination of weldment material properties and process performance in a remote, radioactive environment. Conceptual designs have been generated for these processes to illustrate how they would be implemented in practice. Homopolar resistance welding was included in the Phase 1 analysis, and developments in this process will be monitored via literature in Phases 2 and 3. Work was conducted in accordance with the YMP Quality Assurance Program. 223 refs., 20 figs., 9 tabs.

Robitz, E.S. Jr.; McAninch, M.D. Jr.; Edmonds, D.P. [Babcock and Wilcox Co., Lynchburg, VA (USA). Nuclear Power Div.]|[Babcock and Wilcox Co., Alliance, OH (USA). Research and Development Div.

1990-09-01T23:59:59.000Z

92

The dynamic structure of management support systems: theory development, research focus, and direction  

Science Conference Proceedings (OSTI)

Using a systems perspective, a conceptual model is developed that encompasses a broad class of systems whose fundamental purpose is the support of managerial actions and decision making. The term management support systems (MSS) is used to label this ... Keywords: business intelligence, decision support systems, executive information systems, knowledge management systems, management support systems

Thomas D. Clark; Mary C. Jones; Curtis P. Armstrong

2007-09-01T23:59:59.000Z

93

The Role of Renewable Energies in Energy Supply and Management for Sustainable Development. "case of Rwanda".  

E-Print Network (OSTI)

?? Final Master Thesis report EGI 2010-2013   Thesis Title: The Role of Renewable Energies in Energy supply Planning and   Management for Sustainable    Development “Case… (more)

Rutagengwa, John

2013-01-01T23:59:59.000Z

94

Evaluating Ocean Management Systems to Facilitate the Development of Ecosystem-Based Management  

E-Print Network (OSTI)

Report R/OPC-ENV-02 Evaluating Ocean Management Systems toinformation about how the oceans are governed can be gleanedthe understanding of existing ocean governance to assist

Young, Oran R

2009-01-01T23:59:59.000Z

95

Generic Natural Systems Evaluation - Thermodynamic Database Development and Data Management  

DOE Green Energy (OSTI)

Thermodynamic data are essential for understanding and evaluating geochemical processes, as by speciation-solubility calculations, reaction-path modeling, or reactive transport simulation. These data are required to evaluate both equilibrium states and the kinetic approach to such states (via the affinity term or its equivalent in commonly used rate laws). These types of calculations and the data needed to carry them out are a central feature of geochemistry in many applications, including water-rock interactions in natural systems at low and high temperatures. Such calculations are also made in engineering studies, for example studies of interactions involving man-made materials such as metal alloys and concrete. They are used in a fairly broad spectrum of repository studies where interactions take place among water, rock, and man-made materials (e.g., usage on YMP and WIPP). Waste form degradation, engineered barrier system performance, and near-field and far-field transport typically incorporate some level of thermodynamic modeling, requiring the relevant supporting data. Typical applications of thermodynamic modeling involve calculations of aqueous speciation (which is of great importance in the case of most radionuclides), solubilities of minerals and related solids, solubilities of gases, and stability relations among the various possible phases that might be present in a chemical system at a given temperature and pressure. If a phase can have a variable chemical composition, then a common calculational task is to determine that composition. Thermodynamic modeling also encompasses ion exchange and surface complexation processes. Any and all of these processes may be important in a geochemical process or reactive transport calculation. Such calculations are generally carried out using computer codes. For geochemical modeling calculations, codes such as EQ3/6 and PHREEQC, are commonly used. These codes typically provide 'full service' geochemistry, meaning that they use a large body of thermodynamic data, generally from a supporting database file, to sort out the various important reactions from a wide spectrum of possibilities, given specified inputs. Usually codes of this kind are used to construct models of initial aqueous solutions that represent initial conditions for some process, although sometimes these calculations also represent a desired end point. Such a calculation might be used to determine the major chemical species of a dissolved component, the solubility of a mineral or mineral-like solid, or to quantify deviation from equilibrium in the form of saturation indices. Reactive transport codes such as TOUGHREACT and NUFT generally require the user to determine which chemical species and reactions are important, and to provide the requisite set of information including thermodynamic data in an input file. Usually this information is abstracted from the output of a geochemical modeling code and its supporting thermodynamic data file. The Yucca Mountain Project (YMP) developed two qualified thermodynamic databases to model geochemical processes, including ones involving repository components such as spent fuel. The first of the two (BSC, 2007a) was for systems containing dilute aqueous solutions only, the other (BSC, 2007b) for systems involving concentrated aqueous solutions and incorporating a model for such based on Pitzer's (1991) equations. A 25 C-only database with similarities to the latter was also developed for the Waste Isolation Pilot Plant (WIPP, cf. Xiong, 2005). The NAGRA/PSI database (Hummel et al., 2002) was developed to support repository studies in Europe. The YMP databases are often used in non-repository studies, including studies of geothermal systems (e.g., Wolery and Carroll, 2010) and CO2 sequestration (e.g., Aines et al., 2011).

Wolery, T W; Sutton, M

2011-09-19T23:59:59.000Z

96

Developing A Safety Culture In A Research And Development Environment: Air Traffic Management Domain  

E-Print Network (OSTI)

Measuring safety climate has been undertaken in many industries (e.g. oil, nuclear, aviation) over the past twenty years, as a proactive method of collecting safety information about the current level of safety in the organisation. However, there has been little work undertaken to develop the safety culture of the designers of these technological systems, to ensure that their designs are endeavouring to reach the highest levels of safety. A tool was developed to measure the current level of safety culture of designers in an air traffic navigation R&D organisation and contains 21 sub-sections under the following four main headings: i) Management Demonstration of Safety; ii) Planning and Organising for Safety; iii) Communication, Trust & Responsibility for Safety and iv) Measuring, Auditing and Reviewing. The findings indicated that the main areas for improvement are: i) the safety management system; ii) team integration; iii) responsibility for safety. Based on the survey findings some changes were undertaken in an attempt to improve the safety culture at the centre and a repeat survey is planned for April, 2005 to assess any improvements. This paper will describe the survey method and findings, the safety improvement plan, preliminary findings from the follow-up survey and lessons learnt during the change process. 1.

Rachael Gordon; Barry Kirwan

2005-01-01T23:59:59.000Z

97

Review of the Portsmouth Gaseous Diffusion Plant Integrated Safety Management System Phase I Verification Review, April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant Integrated Safety Management System Phase I Verification Review April 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1 4.0 Methodology......................................................................................................................................... 1

98

Review of the Portsmouth Gaseous Diffusion Plant Integrated Safety Management System Phase I Verification Review, April 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant Integrated Safety Management System Phase I Verification Review April 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1 4.0 Methodology......................................................................................................................................... 1

99

Zero Discharge Water Management for Horizontal Shale Gas Well Development  

SciTech Connect

Hydraulic fracturing technology (fracking), coupled with horizontal drilling, has facilitated exploitation of huge natural gas (gas) reserves in the Devonian-age Marcellus Shale Formation (Marcellus) of the Appalachian Basin. The most-efficient technique for stimulating Marcellus gas production involves hydraulic fracturing (injection of a water-based fluid and sand mixture) along a horizontal well bore to create a series of hydraulic fractures in the Marcellus. The hydraulic fractures free the shale-trapped gas, allowing it to flow to the well bore where it is conveyed to pipelines for transport and distribution. The hydraulic fracturing process has two significant effects on the local environment. First, water withdrawals from local sources compete with the water requirements of ecosystems, domestic and recreational users, and/or agricultural and industrial uses. Second, when the injection phase is over, 10 to 30% of the injected water returns to the surface. This water consists of flowback, which occurs between the completion of fracturing and gas production, and produced water, which occurs during gas production. Collectively referred to as returned frac water (RFW), it is highly saline with varying amounts of organic contamination. It can be disposed of, either by injection into an approved underground injection well, or treated to remove contaminants so that the water meets the requirements of either surface release or recycle use. Depending on the characteristics of the RFW and the availability of satisfactory disposal alternatives, disposal can impose serious costs to the operator. In any case, large quantities of water must be transported to and from well locations, contributing to wear and tear on local roadways that were not designed to handle the heavy loads and increased traffic. The search for a way to mitigate the situation and improve the overall efficiency of shale gas production suggested a treatment method that would allow RFW to be used as make-up water for successive fracs. RFW, however, contains dissolved salts, suspended sediment and oils that may interfere with fracking fluids and/or clog fractures. This would lead to impaired well productivity. The major technical constraints to recycling RFW involves: identification of its composition, determination of industry standards for make-up water, and development of techniques to treat RFW to acceptable levels. If large scale RFW recycling becomes feasible, the industry will realize lower transportation and disposal costs, environmental conflicts, and risks of interruption in well development schedules.

Paul Ziemkiewicz; Jennifer Hause; Raymond Lovett; David Locke Harry Johnson; Doug Patchen

2012-03-31T23:59:59.000Z

100

Continuing Developments in PV Risk Management: Strategies, Solutions, and Implications  

Science Conference Proceedings (OSTI)

As the PV industry matures, successful risk management practices will become more imperative to ensure investor confidence, control costs, and facilitate further growth. This report discusses several key aspects of risk management during the commercial- and utility-scale project life cycle, from identification of risks, to the process of mitigating and allocating those risks among project parties, to transferring those risks through insurance. The report also explores novel techniques in PV risk management, options to offload risks onto the capital markets, and innovative insurance policies (namely warranty policies) that address risks unique to the PV sector. One of the major justifications for robust risk management in the PV industry is the cost-reduction opportunities it affords. If the PV industry can demonstrate the capability to successfully manage its risks, thereby inspiring confidence in financiers, it may be able to obtain a lower cost of capital in future transactions. A lower cost of capital translates to a lower cost of energy, which will in turn enhance PV?s competitiveness at a time when it will have to rely less on subsidies to support its market penetration.

Lowder, T.; Mendelsohn, M.; Speer, B.; Hill, R.

2013-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

A Development of Mg Alloy Reinforced by Quasicrystalline Phase  

Science Conference Proceedings (OSTI)

A Molecular Dynamics Study of Fracture Behavior in Magnesium Single Crystal ... Effect of KCl on Liquidus of LiF-MgF2 Molten Salts ... Investigation of Microhardness and Microstructure of AZ31 Alloy after High-Pressure Torsion ( HPT) ... Benchmark Test in the “Magnesium Front End Research and Development” Project.

102

Explosives program development study: Phase 3, Final report  

SciTech Connect

Under the sponsorship of Lawrence Livermore National Laboratory (LLNL) and the Defense Advanced Research Agency (DARPA), The BDM Corporation has been conducting a survey and assessment of the status of research and development in high energy materials, particulary explosives. The objectives of the DARPA Explosives Program Development Study is to provide LLNL and DARPA with: (1) An assessment of the current research and development in high energy materials and an identification of needs for further work; (2) A set of recommendations to address those needs with DARPA (3) A program plan to implement these recommendations. The study consisted of review of papers from the principal high energy materials research and development conferences of 1985 - 1987; personal and telephone interviews with experts in the field in military services and DOE laboratories; review of papers of the ONR detonation symposia; principal technical journals; government reports; and a questionnaire survey of the explosives community for their ranking of research topics in materials. Four principal categories of operational issues and requirements were surveyed: energetic materials; performance; sensitivity/vulnerability; and manufacture and cost factors. These four categories are fully covered. 24 refs.

Hill, M.E.

1988-01-31T23:59:59.000Z

103

Biomass power for rural development: Phase 2. Technical progress report, April 1--June 30, 1998  

DOE Green Energy (OSTI)

The project undertaken by the Salix Consortium is a multi-phased, multi-partner endeavor. Phase-1 focused on initial development and testing of the technology and agreements necessary to demonstrate commercial willow production in Phase-2. The Phase-1 objectives have been successfully completed: preparing final design plans for two utility pulverized coal boilers, developing fuel supply plans for the project, obtaining power production commitments from the power companies for Phase-2, obtaining construction and environmental permits, and developing an experimental strategy for crop production and power generation improvements needed to assure commercial success. The R and D effort also addresses environmental issues pertaining to introduction of the willow energy system. Beyond those Phase-1 requirements the Consortium has already successfully demonstrated cofiring at Greenidge Station and developed the required nursery capacity for acreage scale-up. This past summer 105 acres were prepared in advance for the spring planting in 1998. Having completed the above tasks, the Consortium is well positioned to begin Phase-2. In phase-2 every aspect of willow production and power generation from willow will be demonstrated. The ultimate objective of Phase-2 is to transition the work performed under the Rural Energy for the Future project into a thriving, self-supported energy crop enterprise.

Neuhauser, E.

1998-11-01T23:59:59.000Z

104

Micro/Nano-Scale Phase Change Systems for Thermal Management and Solar Energy Conversion Applications  

E-Print Network (OSTI)

and Techniques,” Energy Conversion and Management, 39 (11),Applications,” Energy Conversion and Management, 45 , pp.2011, “Low-grade Heat Conversion into Power Using Organic

Coso, Dusan

2013-01-01T23:59:59.000Z

105

George T. Basabilvazo Named Assistant Manager for Development and Research at Carlsbad Field Office  

NLE Websites -- All DOE Office Websites (Extended Search)

George T. Basabilvazo Named Assistant Manager George T. Basabilvazo Named Assistant Manager For Development and Research at Carlsbad Field Office CARLSBAD, N.M., October 4, 2000 - George T. Basabilvazo has been named Assistant Manager for Development and Research at the U.S. Department of Energy's (DOE) Carlsbad Field Office. "I am delighted to have George in this position," said Dr. Inés Triay, Manager of the Carlsbad Field Office. "He has the experience to ensure that we move forward in developing new technologies to dispose of waste in an environmentally safe manner." Basabilvazo will manage, develop and implement program activities that focus on economic development, technology transfer, international programs and the deployment of new technology for transuranic waste characterization, transportation and disposal.

106

High-R window technology development. Phase 2, Final report  

SciTech Connect

Of all building envelope elements, windows always have had the highest heat loss rates. However, recent advances in window technologies such as low-emissivity (low-E) coatings and low- conductivity gas fillings have begun to change the status of windows in the building energy equation, raising the average R-value (resistance to heat flow) from 2 to 4 h-ft{sup 2}-{degrees}F/Btu. Building on this trend and using a novel combination of low-E coatings, gas-fills, and three glazing layers, the authors developed a design concept for R-6 to R-10 ``super`` windows. Three major window manufacturers produced prototype superwindows based this design for testing and demonstration in three utility-sponsored and -monitored energy-conserving homes in northwestern Montana. This paper discusses the design and tested performance of these three windows and identifies areas requiring further research if these window concepts are to be successfully developed for mass markets.

Arasteh, D.

1991-01-01T23:59:59.000Z

107

Development of power facility management services using RFID/USN  

Science Conference Proceedings (OSTI)

In the electric power industry, there are many research projects to stabilise the power and increase the efficiency using ubiquitous technology. Many power utilities control and supervise the transmission line of energy to avoid power failures. In this ... Keywords: #, 47, RFID, RFID&, USN, cable joint, electric power industry, power facility management, radio frequency identification, service framework, ubiquitous sensor networks, wireless networks

Young-Il Kim; Jae-Ju Song; Jin-Ho Shin; Bong-Jae Yi; Hoon Choi

2009-03-01T23:59:59.000Z

108

High-R Window Technology Development : Phase II Final Report.  

SciTech Connect

Of all building envelope elements, windows always have had the highest heat loss rates. However, recent advances in window technologies such as low-emissivity (low-E) coatings and low- conductivity gas fillings have begun to change the status of windows in the building energy equation, raising the average R-value (resistance to heat flow) from 2 to 4 h-ft{sup 2}-{degrees}F/Btu. Building on this trend and using a novel combination of low-E coatings, gas-fills, and three glazing layers, the authors developed a design concept for R-6 to R-10 super'' windows. Three major window manufacturers produced prototype superwindows based this design for testing and demonstration in three utility-sponsored and -monitored energy-conserving homes in northwestern Montana. This paper discusses the design and tested performance of these three windows and identifies areas requiring further research if these window concepts are to be successfully developed for mass markets.

Arasteh, Dariush

1991-01-01T23:59:59.000Z

109

DOE - Office of Legacy Management -- Standard Oil Development...  

Office of Legacy Management (LM)

Standard Oil Development Co of NJ - NJ 18 FUSRAP Considered Sites Site: STANDARD OIL DEVELOPMENT CO. OF NJ (NJ.18) Eliminated from consideration under FUSRAP Designated Name: Not...

110

Integrated Safety Management System Phase I Verification for the Plutonium Finishing Plant (PFP) [VOL 1 & 2  

Science Conference Proceedings (OSTI)

U.S. Department of Energy (DOE) Policy 450.4, Safety Management System Policy commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex as a means of accomplishing its missions safely. DOE Acquisition Regulation 970.5204-2 requires that contractors manage and perform work in accordance with a documented safety management system.

SETH, S.S.

2000-01-10T23:59:59.000Z

111

Federal Emergency Management Information Systems (FEMIS), System Administration Guide FEMIS: Phase 1, Version 1.1u  

SciTech Connect

The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package.

Cerna, P.A.; Conner, W.M.; Curtis, L.M. [and others

1995-06-01T23:59:59.000Z

112

River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99  

Science Conference Proceedings (OSTI)

The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES&H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractor proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.

SHOOP, D.S.

1999-09-10T23:59:59.000Z

113

UNEP-GEF Renewable Energy Project Financial Risk Management in Developing  

Open Energy Info (EERE)

UNEP-GEF Renewable Energy Project Financial Risk Management in Developing UNEP-GEF Renewable Energy Project Financial Risk Management in Developing Countries Jump to: navigation, search Name UNEP-GEF Renewable Energy Project Financial Risk Management in Developing Countries Agency/Company /Organization United Nations Environment Programme Partner Global Environment Facility Sector Energy Focus Area Renewable Energy Topics Finance, Market analysis Website http://www.unep.fr/energy/acti References UNEP Financial Risk Management [1] "This UNEP/GEF targeted research project aims to catalyse new thinking in the risk management area, examining existing instruments and approaches and suggesting potential modalities for new instruments that could be developed in partnership with private and public sector financial institutions. The

114

Conservation Genetics of California Abalone: Developing Tools for Management  

E-Print Network (OSTI)

Conservation Genetics of California Abalone: Developingto develop effective conservation and recovery strategies

Burton, Ronald S.

2005-01-01T23:59:59.000Z

115

Management and Development of the Western Resources Project  

Science Conference Proceedings (OSTI)

The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

Terry Brown

2009-03-09T23:59:59.000Z

116

Risk-Managed Technical Specifications (RMTS) Guidelines: Interim Development Report  

Science Conference Proceedings (OSTI)

This report presents nuclear utilities with a technical framework and associated general guidance for implementation of risk-managed technical specifications (RMTS) as a partial replacement for existing conventional plant technical specifications. This interim report, intended for both Westinghouse and non-Westinghouse reactor plants and for future reference and application by the Nuclear Energy Institute (NEI), will probably be updated in the future as risk-informed applications technology continues to ...

2003-11-21T23:59:59.000Z

117

Biomass power for rural development. Technical progress report, Phase 2, July 1--September 30, 1998  

DOE Green Energy (OSTI)

The project undertaken by the Salix Consortium is a multi-phased, multi-partner endeavor. Phase 1 focused on initial development and testing of the technology and forging the necessary agreements to demonstrate commercial willow production. The Phase 1 objectives have been successfully completed: preparing final design plans for two utility pulverized coal boiler for 20 MW of biopower capacity; developing fuel supply plans for the project with a goal of establishing 365 ha (900 ac) of willow; obtaining power production commitments from the power companies for Phase 2; obtaining construction and environmental permits; and developing an experimental strategy for crop production and power generation improvements needed to assure commercial success. The R and D effort also addresses environmental issues pertaining to introduction of the willow energy system. Beyond those Phase 1 requirements, the Consortium has already successfully demonstrated cofiring at Greenidge Station and has initiated development of the required nursery capacity for acreage scale-up. In Phase 2 every aspect of willow production and power generation from willow biomass will be demonstrated. The ultimate objective of Phase 2 is to transition the work performed under the Biomass Power for Rural Development project into a thriving, self-supported energy crop enterprise.

Neuhauser, E.

1999-01-01T23:59:59.000Z

118

Development of an Enhanced Two-Phase Production System at the Geysers Geothermal Field  

DOE Green Energy (OSTI)

A method was developed to enhance geothermal steam production from two-phase wells at THE Geysers Geothermal Field. The beneficial result was increased geothermal production that was easily and economically delivered to the power plant.

Steven Enedy

2001-12-14T23:59:59.000Z

119

THE WIDE-AREA ENERGY STORAGE AND MANAGEMENT SYSTEM PHASE II Final Report - Flywheel Field Tests  

Science Conference Proceedings (OSTI)

This research was conducted by Pacific Northwest National Laboratory (PNNL) operated for the U.S. department of Energy (DOE) by Battelle Memorial Institute for Bonneville Power Administration (BPA), California Institute for Energy and Environment (CIEE) and California Energy Commission (CEC). A wide-area energy management system (WAEMS) is a centralized control system that operates energy storage devices (ESDs) located in different places to provide energy and ancillary services that can be shared among balancing authorities (BAs). The goal of this research is to conduct flywheel field tests, investigate the technical characteristics and economics of combined hydro-flywheel regulation services that can be shared between Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) controlled areas. This report is the second interim technical report for Phase II of the WAEMS project. This report presents: 1) the methodology of sharing regulation service between balancing authorities, 2) the algorithm to allocate the regulation signal between the flywheel and hydro power plant to minimize the wear-and-tear of the hydro power plants, 3) field results of the hydro-flywheel regulation service (conducted by the Beacon Power), and 4) the performance metrics and economic analysis of the combined hydro-flywheel regulation service.

Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.; Rudolph, Frank; Murthy, Shashikala; Arseneaux, Jim; Loutan, Clyde; Chowdhury, S.

2010-08-31T23:59:59.000Z

120

Micro/Nano-Scale Phase Change Systems for Thermal Management and Solar Energy Conversion Applications  

E-Print Network (OSTI)

Energy Storage for Power Generation. Part 1—Concepts,effectively. Thus, in power generation systems, phase changeIn addition to power generation, phase change heat transfer

Coso, Dusan

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Research, Development and Demonstration of Micro-CHP Systems for Residential Applications - Phase I  

Science Conference Proceedings (OSTI)

The objective of the Micro-CHP Phase I effort was to develop a conceptual design for a Micro-CHP system including: Defining market potential; Assessing proposed technology; Developing a proof-of-principle design; and Developing a commercialization strategy. TIAX LLC assembled a team to develop a Micro-CHP system that will provide electricity and heating. TIAX, the contractor and major cost-share provider, provided proven expertise in project management, prime-mover design and development, appliance development and commercialization, analysis of residential energy loads, technology assessment, and market analysis. Kohler Company, the manufacturing partner, is a highly regarded manufacturer of standby power systems and other residential products. Kohler provides a compellingly strong brand, along with the capabilities in product development, design, manufacture, distribution, sales, support, service, and marketing that only a manufacturer of Kohler's status can provide. GAMA, an association of appliance and equipment manufacturers, provided a critical understanding of appliance commercialization issues, including regulatory requirements, large-scale market acceptance issues, and commercialization strategies. The Propane Education & Research Council, a cost-share partner, provided cost share and aided in ensuring the fuel flexibility of the conceptual design. Micro-CHP systems being commercialized in Europe and Japan are generally designed to follow the household thermal load, and generate electricity opportunistically. In many cases, any excess electricity can be sold back to the grid (net metering). These products, however, are unlikely to meet the demands of the U.S. market. First, these products generally cannot provide emergency power when grid power is lost--a critical feature to market success in the U.S. Even those that can may have insufficient electric generation capacities to meet emergency needs for many U.S. homes. Second, the extent to which net metering will be available in the U.S. is unclear. Third, these products are typically not designed for use in households having forced hot-air heating, which is the dominant heating system in the U.S. The U.S. market will also require a major manufacturer that has the reputation and brand recognition, low-cost manufacturing capability, distribution, sales, and service infrastructure, and marketing power to achieve significant market size with a previously unknown and unproven product. History has proven time and time again that small-to-medium-size manufacturers do not have the resources and capabilities to achieve significant markets with such products. During the Phase I effort, the Team developed a conceptual design for a Micro-CHP system that addresses key DOE and U.S. market needs: (1) Provides emergency power adequate for critical household loads, with none of the key drawbacks associated with typical, low-cost emergency generators, such as liquid fuel storage, inability to power ''hard-wired'' loads, need to run temporary extension cords for plug loads, manual set up required, susceptibility to overload, and risk of failure due to lack of maintenance and infrequent operation; (2) Requires no special skills to install--plumbers, electricians and HVAC technicians will typically have all necessary skills; (3) Can be used with the major residential fuels in the U.S., including natural gas and propane, and can be easily adapted to fuel oil as well as emerging fuels as they become available; and (4) Significantly reduces household energy consumption and energy costs.

Robert A. Zogg

2011-03-14T23:59:59.000Z

122

Development of Zinc/Bromine Batteries for Load-Leveling Applications: Phase 2 Final Report  

DOE Green Energy (OSTI)

This report documents Phase 2 of a project to design, develop, and test a zinc/bromine battery technology for use in utility energy storage applications. The project was co-funded by the U.S. Department of Energy Office of Power Technologies through Sandia National Laboratories. The viability of the zinc/bromine technology was demonstrated in Phase 1. In Phase 2, the technology developed during Phase 1 was scaled up to a size appropriate for the application. Batteries were increased in size from 8-cell, 1170-cm{sup 2} cell stacks (Phase 1) to 8- and then 60-cell, 2500-cm{sup 2} cell stacks in this phase. The 2500-cm{sup 2} series battery stacks were developed as the building block for large utility battery systems. Core technology research on electrolyte and separator materials and on manufacturing techniques, which began in Phase 1, continued to be investigated during Phase 2. Finally, the end product of this project was a 100-kWh prototype battery system to be installed and tested at an electric utility.

CLARK,NANCY H.; EIDLER,PHILLIP

1999-10-01T23:59:59.000Z

123

DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM2.5) RESEARCH  

SciTech Connect

Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase 1, which is currently in progress and will take twelve months to complete, will include the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. In Phase 2, which will be completed in the second year of the project, a platform for on-line data analysis will be developed. Phase 2 will include the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its sixth month of Phase 1 development activities.

Robinson P. Khosah; Charles G. Crawford

2003-03-13T23:59:59.000Z

124

Design and development of a laminated Fresnel lens for point-focus PV systems. Phase II  

DOE Green Energy (OSTI)

A laminated glass-plastic lens parquet using injection molded point focus Fresnel lenses is described. The second phase of a program aimed at investigating the cost effectiveness of a glass-plastic concentrator lens assembly is reported. The first phase dealt with the development of a first generation lens design, the selection of the preferred glass coverplate and glass-to-lens adhesive and initial injection molding lens molding trials. The second phase has dealt with the development of an improved lens design, a full size parquet lamination process, and a second group of injection molding lens molding trials.

Hodge, R.C.

1982-12-01T23:59:59.000Z

125

Native American Technical Assistance and Training for Renewable Energy Resource Development and Electrical Generation Facilities Management  

DOE Green Energy (OSTI)

The Council of Energy Resource Tribes (CERT) will facilitate technical expertise and training of Native Americans in renewable energy resource development for electrical generation facilities, and distributed generation options contributing to feasibility studies, strategic planning and visioning. CERT will also provide information to Tribes on energy efficiency and energy management techniques.This project will provide facilitation and coordination of expertise from government agencies and private industries to interact with Native Americans in ways that will result in renewable energy resource development, energy efficiency program development, and electrical generation facilities management by Tribal entities. The intent of this cooperative agreement is to help build capacity within the Tribes to manage these important resources.

A. David Lester

2008-10-17T23:59:59.000Z

126

Development and Testing of Industrial Scale Coal Fired Combustion System, Phase 3  

SciTech Connect

Coal Tech Corp's mission is to develop, license & sell innovative, lowest cost, solid fuel fired power systems & total emission control processes using proprietary and patented technology for domestic and international markets. The present project 'DEVELOPMENT & TESTING OF INDUSTRIAL SCALE, COAL FIRED COMBUSTION SYSTEM, PHASE 3' on DOE Contract DE-AC22-91PC91162 was a key element in achieving this objective. The project consisted of five tasks that were divided into three phases. The first phase, 'Optimization of First Generation 20 MMBtu/hr Air-Cooled Slagging Coal Tech Combustor', consisted of three tasks, which are detailed in Appendix 'A' of this report. They were implemented in 1992 and 1993 at the first generation, 20 MMBtu/hour, combustor-boiler test site in Williamsport, PA. It consisted of substantial combustor modifications and coal-fired tests designed to improve the combustor's wall cooling, slag and ash management, automating of its operation, and correcting severe deficiencies in the coal feeding to the combustor. The need for these changes was indicated during the prior 900-hour test effort on this combustor that was conducted as part of the DOE Clean Coal Program. A combination of combustor changes, auxiliary equipment changes, sophisticated multi-dimensional combustion analysis, computer controlled automation, and series of single and double day shift tests totaling about 300 hours, either resolved these operational issues or indicated that further corrective changes were needed in the combustor design. The key result from both analyses and tests was that the combustor must be substantially lengthened to maximize combustion efficiency and sharply increase slag retention in the combustor. A measure of the success of these modifications was realized in the third phase of this project, consisting of task 5 entitled: 'Site Demonstration with the Second Generation 20 MMBtu/hr Air-Cooled Slagging Coal Tech Combustor'. The details of the task 5 effort are contained in Appendix 'C'. It was implemented between 1994 and 1998 after the entire 20 MMBtu/hr combustor-boiler facility was relocated to Philadelphia, PA in 1994. A new test facility was designed and installed. A substantially longer combustor was fabricated. Although not in the project plan or cost plan, an entire steam turbine-electric power generating plant was designed and the appropriate new and used equipment for continuous operation was specified. Insufficient funds and the lack of a customer for any electric power that the test facility could have generated prevented the installation of the power generating equipment needed for continuous operation. All other task 5 project measures were met and exceeded. 107 days of testing in task 5, which exceeded the 63 days (about 500 hours) in the test plan, were implemented. Compared to the first generation 20 MMBtu/hr combustor in Williamsport, the 2nd generation combustor has a much higher combustion efficiency, the retention of slag inside the combustor doubled to about 75% of the coal ash, and the ash carryover into the boiler, a major problem in the Williamsport combustor was essentially eliminated. In addition, the project goals for coal-fired emissions were exceeded in task 5. SO{sub 2} was reduced by 80% to 0.2 lb/MMBtu in a combination of reagent injection in the combustion and post-combustion zones. NO{sub x} was reduced by 93% to 0.07 lb/MMBtu in a combination of staged combustion in the combustor and post-combustion reagent injection. A baghouse was installed that was rated to 0.03 lb/MMBtu stack particle emissions. The initial particle emission test by EPA Method 5 indicated substantially higher emissions far beyond that indicated by the clear emission plume. These emissions were attributed to steel particles released by wall corrosion in the baghouse, correction of which had no effect of emissions.

Bert Zauderer

1998-09-30T23:59:59.000Z

127

Development of a dispatchable PV peak shaving system. Final report on PV:BONUS Phase 2 activities  

DOE Green Energy (OSTI)

In July 1993, the Delmarva Power and Light Company (now Conectiv, Inc.) was awarded a contract for the development of a Dispatchable Photovoltaic Peak Shaving System under the US Department of Energy PV:BONUS Program. The rationale for the dispatchable PV peak shaving system is based on the coincidence between the solar resource and the electrical load in question. Where poor coincidence exists, a PV array by itself does little to offset peak demands. However, with the addition of a relatively small amount of energy storage, the energy from the PV array can be managed and the value of the PV system increases substantially. In Phase 2, Delmarva Power continued the refinement of the system deployed in Phase 1. Four additional dispatchable PV peak shaving systems were installed for extended testing and evaluation at sites in Delaware, Maryland, Wisconsin and North Carolina. A second type of system that can be used to provide back-up power as well as peak shaving was also developed in Phase 2. This PV-UPS system used a packaging approach nearly identical to the PV peak shaving system, although there were significant differences in the design of the power electronics and control systems. Conceptually, the PV-UPS system builds upon the idea of adding value to PV systems by increasing functionality. A prototype of the PV-UPS system was installed in Delaware for evaluation near the end of the contract period.

Ferguson, W.D. [Conectiv, Inc., Wilmington, DE (United States); Nigro, R.M. [Applied Energy Group, Inc., Hauppauge, NY (United States)

1999-01-20T23:59:59.000Z

128

Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

CARTER, R.P.

1999-11-19T23:59:59.000Z

129

Research and Development Planning: Program 57 Siting, Vegetation Management, and Avian Issues  

Science Conference Proceedings (OSTI)

This report documents the outcome of two planning sessions conducted in 2006 and 2007 to support research and development planning for Program 57Rights of Way: Siting, Vegetation Management, and Avian Issues.

2007-06-18T23:59:59.000Z

130

A framework for developing, manufacturing, and sourcing trucks & equipment in a global fluid management industry  

E-Print Network (OSTI)

Selecting and executing the optimal strategy for developing new products is a non trivial task, especially for low volume, high complexity products in a highly volatile global industry such as Fluid Management. At Fluid ...

Awwad, Ghassan Samir

2009-01-01T23:59:59.000Z

131

Plant Engineering: Users Guide for the Development of Life Cycle Management Plans  

Science Conference Proceedings (OSTI)

This guide provides direction for the user in the development, implementation, and maintenance of life cycle management plans (LCMPs).  The guide includes an appendix containing a template that users can employ in the development of their plant-specific LCMPs.BackgroundEPRI report TR-106109, Nuclear Plant Life Cycle Management Implementation Guide, was issued in November 1998. Since the publication of that report, the industry has gained much ...

2012-12-12T23:59:59.000Z

132

Rights-Of-Way (ROW) Environmental Management: New ROW Development and Existing ROW Maintenance  

Science Conference Proceedings (OSTI)

During October 27-29, 1997, the Electric Power Research Institute (EPRI) and the Empire State Electric Energy Research Corporation (ESEERCO) sponsored a workshop to assess the need for a program of environmental research on Rights-of-Way (ROW) development and management, and to develop a research agenda. The workshop built on 1993 and 1996 EPRI meetings, and on the 6th International Symposium on Environmental Concerns in Rights-of-Way Management held in February, 1997. This document presents the proceedi...

1999-12-15T23:59:59.000Z

133

Development of a Fuel Containing Material Removal and Waste Management Strategy for the Chernobyl Unit 4 Shelter  

Science Conference Proceedings (OSTI)

A study was performed to develop a strategy for the removal of fuel-containing material (FCM) from the Chernobyl Unit 4 Shelter and for the related waste management. This study was performed during Phase 1 of the Shelter Implementation Plan (SIP) and was funded by the Chernobyl Shelter Fund. The main objective for Phase 2 of the SIP is to stabilize the Shelter and to construct a New Confinement (NC) by the year 2007. In addition, the SIP includes studies on the strategy and on the conceptual design implications of the removal of FCM from the Shelter. This is considered essential for the ultimate goal, the transformation of the Shelter into an environmentally safe system.

Tokarevsky, V. V.; Shibetsky, Y. A.; Leister, P.; Davison, W. R.; Follin, J. F.; McNair, J.; Lins, W.; Edler, G.

2002-02-27T23:59:59.000Z

134

DOE - Office of Legacy Management -- Westinghouse Atomic Power Development  

NLE Websites -- All DOE Office Websites (Extended Search)

Atomic Power Atomic Power Development Plant - PA 04 FUSRAP Considered Sites Site: WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT (PA.04 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: East Pittsburgh , Pennsylvania PA.04-1 Evaluation Year: 1985 PA.04-2 Site Operations: Research and development on uranium oxide fuel elements in the 1940s. PA.04-3 PA.04-5 Site Disposition: Eliminated - Radiation levels below criteria PA.04-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Zirconium PA.04-3 PA.04-4 Radiological Survey(s): Yes PA.04-1 Site Status: Eliminated from consideration under FUSRAP PA.04-5 Also see Documents Related to WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT

135

DOE - Office of Legacy Management -- Nuclear Development Corp of America -  

Office of Legacy Management (LM)

Nuclear Development Corp of America Nuclear Development Corp of America - NY 32 FUSRAP Considered Sites Site: NUCLEAR DEVELOPMENT CORP. OF AMERICA (NY.32) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 5 New Street , White Plains , New York NY.32-1 Evaluation Year: 1987 NY.32-2 Site Operations: Conducted experiments involving uranium recovery from scrap. NY.32-2 Site Disposition: Eliminated - No Authority - Facility was licensed to handle nuclear materials NY.32-2 NY.32-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.32-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to NUCLEAR DEVELOPMENT CORP. OF AMERICA

136

Federal Energy Management Program: Develop an Institutional Change Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change Continuous Improvement Cycle After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular measurement. Remember that planning useful efficiency and sustainability evaluation is necessary before an organization begins to implement an action plan.

137

Knowledge management practices in automotive safety attribute development  

E-Print Network (OSTI)

Organizations strive continuously to become efficient. Over the years many of them have tried to attain this through streamlining or reengineering their product development practices. 'While some of them succeed others are ...

Krishnaswami, Ram N. (Ram Narian)

2006-01-01T23:59:59.000Z

138

Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research  

Science Conference Proceedings (OSTI)

Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase One includes the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two, which is currently underway, involves the development of a platform for on-line data analysis. Phase Two includes the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its forty-eighth month of development activities.

Robinson P. Khosah; Frank T. Alex

2007-02-11T23:59:59.000Z

139

DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM 2.5) RESEARCH  

Science Conference Proceedings (OSTI)

Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase One includes the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two, which is currently underway, involves the development of a platform for on-line data analysis. Phase Two includes the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its forty-second month of development activities.

Robinson P. Khosah; Charles G. Crawford

2006-02-11T23:59:59.000Z

140

Development of a mult-objective strategic management approach to improve decisions for pavement management practices in local agencies  

E-Print Network (OSTI)

Multiple objectives are often used by agencies trying to manage pavement networks. Often alternative investment strategies can accomplish the agencies’ target objectives. If the goal is to achieve the target objectives at the minimum cost, an approach is needed to assist agencies in identifying investment strategies capable of meeting the targets while minimizing costs. The approach used by the agency should not be limited to an analytical method to mathematically solve the funding allocation problem. Finding mechanisms to ensure the sustainability and efficiency of the investment strategy over time is a great challenge that needs to be addressed by the approach. The challenge is even greater for local agencies where resources are usually limited. This research develops a multi-objective strategic management approach oriented to improving decisions for pavement management practices in local agencies. In this approach, target objectives are tied to key pavement network parameters in the management process. A methodology to identify the best combination of projects to meet target objectives at the minimum cost while maximizing treatment effectiveness is provided as a result of the research. Concepts from the pavement management program (PMP) of the Metropolitan Transportation Commission (MTC) of the San Francisco Bay Area were used as a basis for developing the methodology. Four pavement network parameters are considered for setting the target objectives over the agency’s planning horizon: the average network pavement condition index (PCI), average network remaining life, percent of the pavement network in good condition, and percent of the pavement network in poor and very poor condition. Results from a case study show that funding allocation methods influence the allocation of preservation and rehabilitation funds among pavement network groups, affecting budget estimates and future condition of the pavement network. It is also concluded that the use of mechanisms that facilitate data integration and the flow of knowledge across management levels can contribute to making better informed decisions. Hence, the adoption of the multi-objective strategic pavement management approach developed in this dissertation should lead to identifying more efficient investment strategies for achieving the pavement network state desired by a local agency at a minimum cost.

Chang Albitres, Carlos Martin

2007-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network (OSTI)

Escalation of right-of-way (ROW) costs have been shown to be a prime contributor to project cost escalation in the highway industry. Two problems contribute to ROW cost escalation: 1) the ROW cost estimation and cost estimate management process generally lacks structure and definition as compared to other areas of cost estimation; and 2) there is a lack of integration and communication between those responsible for ROW cost estimating and those responsible for general project cost estimating. The research for this thesis was preceded by a literature review to establish the basis for the study. Data collection was completed through interviews of seven state highway agencies (SHAs) and two local public agencies (LPAs). The findings of the research are presented in a set of ROW flowcharts which document the steps, inputs, and outputs of the ROW cost estimation and cost estimate management process. Three ROW cost estimates and a cost management process take place throughout project development. An effort was made from the onset of the research to relate the ROW cost estimating and cost estimate management process to the first four project development phases (planning, programming. preliminary design, and final design). There are five flowcharts produced as a result of this research: 1) an agency-level flowchart showing all cost estimates and the interaction of ROW with the project development process; 2) a conceptual ROW cost estimating flowchart which depicts the required steps during planning; 3) a baseline ROW cost estimating flowchart which depicts the required steps during programming; 4) an update ROW cost estimating flowchart which depicts the required steps during preliminary design to include a cost estimate management loop; and 5) a ROW cost management flowchart which depicts the required steps during final design. Although selected SHA contacts provided input following the development of the flowcharts, the flowcharts were only validated to a limited extent due to time and budget constraints. These flowcharts attempt to address the two contributing problems to ROW cost escalation by providing structure to the ROW cost estimation process and by developing the ROW process flowcharts linked to the project development process. Based on the input provided by SHA contacts, the flowcharts appear to have the potential to provide guidance to SHAs in improving the accuracy of ROW cost estimates through addressing these two problems.

Lucas, Matthew Allen

2007-12-01T23:59:59.000Z

142

North Wind 4-kW wind-system development. Phase II. Fabrication and test  

DOE Green Energy (OSTI)

This report presents the results of Phase II (testing and fabrication) of a program funded by the US Department of Energy to design, fabricate, and test a cost-effective wind system in the 3 to 6 kW class. During Phase II, using the design developed during Phase I, a prototype 4 kW machine was fabricated and tested in Waitsfield, Vermont. Several problems were encountered and subsequently analyzed. Design modifications, including the use of a larger alternator, are described. Test performed by North Wind and by Rockwell International (which monitored the program) demonstrated the predicted performance characteristics and the validity of the North Wind design.

Lynch, J.; Coleman, C.; Mayer, D.J.

1983-01-01T23:59:59.000Z

143

DOE - Office of Legacy Management -- Wright Air Development Center - OH  

Office of Legacy Management (LM)

Wright Air Development Center - OH Wright Air Development Center - OH 0-08 FUSRAP Considered Sites Site: Wright Air Development Center (OH.0-08) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Wright-Patterson AFB , Ohio OH.0-08-1 Evaluation Year: 1987 OH.0-08-2 Site Operations: The Center's Power Plant Laboratory participated in a joint USAF-AEC ANP Program from 1955 to 1957. A kilocurie gamma facility was constructed and operated. The Center operated under several AEC source material licenses during this period. OH.0-08-1 OH.0-08-2 OH.0-08-4 Site Disposition: Eliminated - Referred to DOD OH.0-08-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium OH.0-08-1

144

Reorganizing for Multi-Project Management: Toyota's New Structure of Product Development Centers  

E-Print Network (OSTI)

this paper is to discuss an emerging organizational structure for new product development at large Japanese automobile firms. This study specifically focuses on describing the objectives and outcomes of changes in product development organization implemented at Toyota in 1992 and 1993. This reorganization is the most fundamental change in product development organization that Toyota has implemented since it established the Shusa (product manager) organization around 1965. The new organization is aimed at multi-project management. It has three vehicle development centers in which multiple projects are grouped together, in contrast to either traditional single-project-oriented or function-oriented organizations.

Kentaro Nobeoka; Edited Michael Cusumano

1995-01-01T23:59:59.000Z

145

Design and Development of Gas-Liquid Cylindrical Cyclone Compact Separators for Three-Phase Flow  

SciTech Connect

The objective of this five-year project (October, 1997--September, 2002) is to expand the current research activities of Tulsa University Separation Technology Projects (TUSTP) to multiphase oil/water/gas separation. This project will be executed in two phases. Phase I (1997--2000) will focus on the investigations of the complex multiphase hydrodynamic flow behavior in a three-phase Gas-Liquid Cylindrical Cyclone (GLCC) Separator. The activities of this phase will include the development of a mechanistic model, a computational fluid dynamics (CFD) simulator, and detailed experimentation on the three-phase GLCC. The experimental and CFD simulation results will be suitably integrated with the mechanistic model. In Phase II (2000--2002), the developed GLCC separator will be tested under high pressure and real crudes conditions. This is crucial for validating the GLCC design for field application and facilitating easy and rapid technology deployment. Design criteria for industrial applications will be developed based on these results and will be incorporated into the mechanistic model by TUSTP.

Mohan, Ram S.; Shoham, Ovadia

1999-10-28T23:59:59.000Z

146

Design and Development of Gas-Liquid Cylindrical Cyclone Compact Separators for Three-Phase Flow  

SciTech Connect

The objective of this five-year project (October 1997--September 2002) was to expand the current research activities of Tulsa University Separation Technology Projects (TUSTP) to multiphase oil/water/gas separation. This project was executed in two phases. Phase I (1997--2000) focused on the investigations of the complex multiphase hydrodynamic flow behavior in a three-phase Gas-Liquid Cylindrical Cyclone (GLCC) Separator. The activities of this phase included the development of a mechanistic model, a computational fluid dynamics (CFD) simulator, and detailed experimentation on the three-phase GLCC. The experimental and CFD simulation results will be suitably integrated with the mechanistic model. In Phase II (2000--2002), the developed GLCC separator will be tested under high pressure and real crude conditions. This is crucial for validating the GLCC design for field application and facilitating easy and rapid technology deployment. Design criteria for industrial applications will be developed based on these results and will be incorporated into the mechanistic model by TUSTP.

Mohan, R.S.; Shoham, O.

2001-01-10T23:59:59.000Z

147

Micro/Nano-Scale Phase Change Systems for Thermal Management and Solar Energy Conversion Applications  

E-Print Network (OSTI)

Heat Exchangers,” Applied Thermal Engineering, 25 (1), pp.Raad P. E. , 2008, “Thermal Challenges in Next-GenerationAssessment of High-Heat-Flux Thermal Management Schemes,”

Coso, Dusan

2013-01-01T23:59:59.000Z

148

Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research  

Science Conference Proceedings (OSTI)

Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analytical tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project was conducted in two phases. Phase One included the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two involved the development of a platform for on-line data analysis. Phase Two included the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now technically completed.

Robinson Khosah

2007-07-31T23:59:59.000Z

149

Research and information needs for management of oil shale development  

SciTech Connect

This report presents information and analysis to assist BLM in clarifying oil shale research needs. It provides technical guidance on research needs in support of their regulatory responsibilities for onshore mineral activities involving oil shale. It provides an assessment of research needed to support the regulatory and managerial role of the BLM as well as others involved in the development of oil shale resources on public and Indian lands in the western United States.

1983-05-01T23:59:59.000Z

150

Technical Update -- Planning Study Model Development and Management  

Science Conference Proceedings (OSTI)

Presently, there has been an increase in the deployment of modern transmission technologies such as static var compensation devices and high-voltage direct-current (HVDC) transmission systems. The deployment of HVDC is likely to increase given the many proposals presently for bringing large and remote pockets of wind generation resources to load centers and proposals in Europe for the development of off-shore grids for wind generation. Furthermore, the deployment of static var compensation ...

2012-11-30T23:59:59.000Z

151

Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas  

SciTech Connect

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

MCCARTHY, M.M.

1999-08-01T23:59:59.000Z

152

Carbon Sequestration - A Natural Resource Management and Research & Development Agency Point of View  

NLE Websites -- All DOE Office Websites (Extended Search)

-- -- A Natural Resource Management and Research & Development Agency Point of View Jim Reaves Staff Director USDA Forest Service R&D Vegetation Management and Protection Research Forests and carbon management § The USDA Forest Service is a research and resource management agency § Carbon is the foundation of forest productivity and sustainability § Carbon sequestration is an additional outcome of good forest management and utilization Forests and carbon sequestration n Forests and forest products are important CO 2 sinks n Carbon sinks offer a potentially significant low-cost opportunity to address carbon sequestration n Feedstocks for bioenergy production provide both clean energy and fossil fuel offsets Trends in forest and agriculture carbon sequestration -342 -12 -7

153

Automated Phase Design and Timing Adjustment for Signal Phase Design  

Science Conference Proceedings (OSTI)

In this paper we describe the design processes of human traffic engineers and the development of an automated system that solves the problem of timing adjustment in signal phase sequence design. i>Signal phase sequencing refers to the sequence of ... Keywords: automated design, case-based reasoning, signal phase design, traffic management

L. Wang; C. C. Hayes; R. R. Penner

2001-06-01T23:59:59.000Z

154

Assessing the Potential for Renewable Energy Development on DOE Legacy Management Lands  

NLE Websites -- All DOE Office Websites (Extended Search)

Legacy Management Legacy Management DOE/GO-102008-2435 February 2008 Assessing the Potential for Renewable Energy Development on DOE Legacy Management Lands Puerto Rico Alaska Assessing the Potential for Renewable Energy Development on DOE Legacy Management Lands Authors: Doug Dahle, Dennis Elliott, Donna Heimiller, Mark Mehos, Robi Robichaud, Marc Schwartz, Byron Stafford, and Andy Walker Published by National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by the Midwest Research Institute * Battelle DOE/GO-102008-2435 February 2008 NOTICE This report was prepared as an account of work sponsored by an agency of the United States

155

Artificial heart development program. Volume I. System development. Phase III summary report  

SciTech Connect

The report documents efforts and results in the development of the power system portions of a calf implantable model of nuclear-powered artificial heart. The primary objective in developing the implantable model was to solve the packaging problems for total system implantation. The power systems portion is physically that portion of the implantable model between the Pu-238 heat sources and the blood pump ventricles. The work performed had two parallel themes. The first of these was the development of an integrated implantable model for bench and animal experiments plus design effort on a more advanced model. The second was research and development on components of the system done in conjunction with the development of the implantable model and to provide technology for incorporation into advanced models plus support to implantations, at the University of Utah, of the systems blood pumping elements when driven by electric motor. The efforts and results of implantable model development are covered, mainly, in the text of the report. The research and development efforts and results are reported, primarily, in the appendices (Vol. 2).

1977-01-01T23:59:59.000Z

156

Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline  

Science Conference Proceedings (OSTI)

This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

Gelles, C. M.; Sheppard, F. R.

2002-02-26T23:59:59.000Z

157

Development of a Groundwater Management Model for the Project Shoal Area  

Science Conference Proceedings (OSTI)

This document describes the development of a user-friendly and efficient groundwater management model of the Project Shoal Area (PSA and surrounding area that will allow the U.S. Department of Energy and State of Nevada personnel to evaluate the impact of proposed water-use scenarios. The management model consists of a simple hydrologic model within an interactive groundwater management framework. This framework is based on an object user interface that was developed by the U.S. Geological Survey and has been used by the Desert Research Institute researchers and others to couple disparate environmental resource models, manage temporal and spatial data, and evaluate model results for management decision making. This framework was modified and applied to the PSA and surrounding Fairview Basin. The utility of the management model was demonstrated through the application of hypothetical future scenarios including mineral mining, regional expansion of agriculture, and export of water to large urban areas outside the region. While the results from some of the scenarios indicated potential impacts to groundwater levels near the PSA and others did not, together they demonstrate the utility of the management tool for the evaluation of proposed changes in groundwater use in or near the PSA.

G. Lamorey; S. Bassett; R. Schumer; D. Boyle; G. Pohll; J. Chapman

2006-09-01T23:59:59.000Z

158

Micro/Nano-Scale Phase Change Systems for Thermal Management and Solar Energy Conversion Applications  

E-Print Network (OSTI)

Review on Sustainable thermal Energy Storage Technologies,D. , 2009, “Review on Thermal Energy Storage with PhaseW. , 2002, “Survey of Thermal Energy Storage for Parabolic

Coso, Dusan

2013-01-01T23:59:59.000Z

159

Fluor Daniel Hanford Inc. integrated safety management system phase 1 verification final report  

SciTech Connect

The purpose of this review is to verify the adequacy of documentation as submitted to the Approval Authority by Fluor Daniel Hanford, Inc. (FDH). This review is not only a review of the Integrated Safety Management System (ISMS) System Description documentation, but is also a review of the procedures, policies, and manuals of practice used to implement safety management in an environment of organizational restructuring. The FDH ISMS should support the Hanford Strategic Plan (DOE-RL 1996) to safely clean up and manage the site's legacy waste; deploy science and technology while incorporating the ISMS theme to ''Do work safely''; and protect human health and the environment.

PARSONS, J.E.

1999-10-28T23:59:59.000Z

160

Liquid Phase Methanol LaPorte Process Development Unit: Modification, operation, and support studies  

DOE Green Energy (OSTI)

A gas phase and a slurry phase radioactive tracer study was performed on the 12 ton/day Liquid Phase Methanol (LPMEOH) Process Development Unit (PDU) in LaPorte, Texas. To study the gas phase mixing characteristics, a radioactive argon tracer was injected into the feed gas and residence time distribution was generated by measuring the response at the reactor outlet. Radioactive manganese oxide powder was independently injected into the reactor to measure the slurry phase mixing characteristics. A tanks-in-series model and an axial dispersion model were applied to the data to characterize the mixing in the reactor. From the axial dispersion model, a translation to the number of CSTR's (continuous stirred tank reactors) was made for comparison purposes with the first analysis. Dispersion correlations currently available in the literature were also compared. The tanks-in-series analysis is a simpler model whose results are easily interpreted. However, it does have a few drawbacks; among them, the lack of a reliable method for scaleup of a reactor and no direct correlation between mixing in the slurry and gas phases. The dispersion model allows the mixing in the gas and slurry phases to be characterized separately while including the effects of phase transfer. This analysis offers a means for combining the gas and slurry phase dispersion models into an effective dispersion coefficient, which, in turn, can be related to an equivalent number of tanks-in-series. The dispersion methods reported are recommended for scaleup of a reactor system. 24 refs., 18 figs., 8 tabs.

Not Available

1990-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Development of infrastructure asset management software solutions for municipalities in South Africa  

E-Print Network (OSTI)

This Record of Study presents the development of infrastructure asset management software solutions for municipalities in South Africa. The study was performed within a multidisciplinary engineering consulting company in South Africa with an interest in expanding its infrastructure asset management consultancy services in the local government market. South Africa faces a large backlog in the delivery of basic services to communities; existing infrastructure is showing signs of advanced aging; and municipalities are inadequately staffed to effectively provide services with limited funding. The company identified the opportunity to support South African municipalities with the delivery of sustainable infrastructure services through the implementation of infrastructure asset management best practice. The provision of these services required the development of infrastructure asset management software that satisfies the needs of municipalities. Infrastructure asset management practice around the world and in the context of municipalities in South Africa was reviewed to gain an understanding of the specific requirements of the asset management software solution. The software functionality was conceptualized and the technical requirements were identified to aid development. Finally, a business plan was prepared to assess the commercial viability of the software and to guide its introduction into the market.

von Holdt, Christopher James

2006-12-01T23:59:59.000Z

162

Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2  

E-Print Network (OSTI)

The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

Parsons, J E

2000-01-01T23:59:59.000Z

163

Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 & Vol 2  

SciTech Connect

The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

PARSONS, J.E.

2000-07-15T23:59:59.000Z

164

Geologic repository work breakdown structure and dictionary---Development and evaluation phase (PE-02)  

Science Conference Proceedings (OSTI)

Revision 2 of the OGR Work Breakdown Structure and Dictionary -- Development and Evaluation Phase (PE-02) supersedes Revision 1, August 1989, in its entirety. The revision is to delete the Exploratory Shaft Facility'' work scape and replace it with Exploratory Studies Facility'' work scape.

Not Available

1991-08-01T23:59:59.000Z

165

Development of a coal fired pulse combustor for residential space heating. Phase I, Final report  

SciTech Connect

This report presents the results of the first phase of a program for the development of a coal-fired residential combustion system. This phase consisted of the design, fabrication, testing, and evaluation of an advanced pulse combustor sized for residential space heating requirements. The objective was to develop an advanced pulse coal combustor at the {approximately} 100,000 Btu/hr scale that can be integrated into a packaged space heating system for small residential applications. The strategy for the development effort included the scale down of the feasibility unit from 1-2 MMBtu/hr to 100,000 Btu/hr to establish a baseline for isolating the effect of scale-down and new chamber configurations separately. Initial focus at the residential scale was concentrated on methods of fuel injection and atomization in a bare metal unit. This was followed by incorporating changes to the advanced chamber designs and testing of refractory-lined units. Multi-fuel capability for firing oil or gas as a secondary fuel was also established. Upon completion of the configuration and component testing, an optimum configuration would be selected for integrated testing of the pulse combustor unit. The strategy also defined the use of Dry Ultrafine Coal (DUC) for Phases 1 and 2 of the development program with CWM firing to be a product improvement activity for a later phase of the program.

NONE

1988-04-01T23:59:59.000Z

166

Ocean thermal energy conversion power system development-I. Phase I. Final report  

DOE Green Energy (OSTI)

The objective of the Ocean Thermal Energy Conversion (OTEC) Power System Development-I (PSD-I), Phase I, study was to develop conceptual and preliminary designs of closed-cycle ammonia power system modules for the 100-MW(e) OTEC Demonstration Plant, the 400-MW(e) Commercial Size Plant, and Heat Exchanger Test Articles representative of the full-size power system module design. Results are presented.

Not Available

1978-12-18T23:59:59.000Z

167

IIntegrated System Health Management for Ground OperationsAutomation for Vehicle and Habitat Operations 2009 Phase II  

E-Print Network (OSTI)

PV systems. Overall goal for this program is development of techniques that enable power system fault effective PHM techniques and fault tolerance for power system reliability and extended operation. Impact will provide reliability and health management tools for the state-of-the-art technologies, such as advanced

168

Full-field simulation for development planning and reservoir management at Kuparuk River field  

SciTech Connect

The Kuparuk River oil field on the Alaskan North Slope produces from two stratigraphically independent sands of the Kuparuk River formation. A full-field reservoir model was constructed to support field management and development planning. The model captures essential aspects of two independent producing horizons, hydraulically coupled at the wellbores, and simulates dynamic interactions between the reservoir stands and surface facilities. This paper reports that the field model is used to plan field development on the basis of performance ranking of drillsite expansions, to assess depletion performance effects of reservoir management strategies, and to evaluate alternative depletion processes and associated reservoir and facility interactions of field projects.

Starley, G.P.; Masino, W.H. Jr.; Weiss, J.L.; Bolling, J.D. (Arco Alaska Inc. (US))

1991-08-01T23:59:59.000Z

169

Management processes in U.S. air traffic management modernization : a study of global navigation satellite system development  

E-Print Network (OSTI)

This thesis investigates organization and management issues associated with the Federal Aviation Administration's (FAA) efforts to modernize the nation's Air Traffic Management (ATM) system. Focus is placed specifically ...

Sandvig, John H.

1994-01-01T23:59:59.000Z

170

River Protection Project Integrated safety management system phase II verification review plan - 7/29/99  

Science Conference Proceedings (OSTI)

The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment.

SHOOP, D.S.

1999-09-10T23:59:59.000Z

171

Development of a Carbon Management Geographic Information System (GIS) for the United States  

SciTech Connect

In this project a Carbon Management Geographical Information System (GIS) for the US was developed. The GIS stored, integrated, and manipulated information relating to the components of carbon management systems. Additionally, the GIS was used to interpret and analyze the effect of developing these systems. This report documents the key deliverables from the project: (1) Carbon Management Geographical Information System (GIS) Documentation; (2) Stationary CO{sub 2} Source Database; (3) Regulatory Data for CCS in United States; (4) CO{sub 2} Capture Cost Estimation; (5) CO{sub 2} Storage Capacity Tools; (6) CO{sub 2} Injection Cost Modeling; (7) CO{sub 2} Pipeline Transport Cost Estimation; (8) CO{sub 2} Source-Sink Matching Algorithm; and (9) CO{sub 2} Pipeline Transport and Cost Model.

Howard Herzog; Holly Javedan

2009-12-31T23:59:59.000Z

172

Thermal Management of Batteries in Advanced Vehicles Using Phase-Change Materials (Presentation)  

DOE Green Energy (OSTI)

This Powerpoint presentation examines battery thermal management using PCM and concludes excellent performance in limiting peak temperatures at short period extensive battery use; although, vehicle designers will need to weigh the potential increase in mass and cost associated with adding PCM against the anticipated benefits.

Kim, G.-H.; Gonder, J.; Lustbader, J.; Pesaran, A.

2007-12-01T23:59:59.000Z

173

NNSAs Management of the $245 million Nuclear Materials Safeguards and Security Upgrades Project Phase II at Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSA's Management of the $245 NNSA's Management of the $245 Million Nuclear Materials Safeguards and Security Upgrades Project Phase II DOE/IG-0901 January 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 January 2, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Report on "NNSA's Management of the $245 million Nuclear Materials Safeguards and Security Upgrades Project Phase II at Los Alamos National Laboratory" BACKGROUND The National Nuclear Security Administration's Los Alamos National Laboratory (LANL) is responsible for the protection and control of a significant portion of the Nation's special nuclear

174

Review of the management of materials research and development in the Department of Energy. Final report  

DOE Green Energy (OSTI)

The Materials Working Group of DOE findings and recommendations of a management nature to improve the handling of materials R and D within DOE are presented. The special role of materials in the development of new energy technologies is provided. (FS)

Not Available

1979-12-01T23:59:59.000Z

175

Advanced turbine systems phase II - conceptual design and product development. Final report, August 1993--July 1996  

SciTech Connect

The National Energy Strategy (NES) calls for a balanced program of greater energy efficiency, use of alternative fuels, and the environmentally responsible development of all U.S. energy resources. Consistent with the NES, a Department of Energy (DOE) program has been created to develop Advanced Turbine Systems (ATS). The technical ATS requirements are based upon two workshops held in Greenville, SC that were sponsored by DOE and hosted by Clemson University. The objective of this 8-year program, managed jointly by DOE`s Office of Fossil Energy, and, Office of Conservation and Renewable Energy, is to develop natural-gas-fired base load power plants that will have cycle efficiencies greater than 60%, lower heating value (LHV), be environmentally superior to current technology, and also be cost competitive. The program will include work to transfer advanced technology to the coal- and biomass-fueled systems being developed in other DOE programs.

1996-10-01T23:59:59.000Z

176

Development of a decision-support system for rural eco-environmental management in Yongxin County, Jiangxi Province, China  

Science Conference Proceedings (OSTI)

A two-layer DSS for rural sustainable development (DRSD) was developed for the comprehensive planning of socioeconomic development and eco-environment protection in Yongxin County, Jiangxi Province, China. The DRSD considers multiple sectors within a ... Keywords: Decision-support system, Eco-environmental management, Farmers, Linear programming, Regional managers, Two-layer

Guo H. Huang; Wei Sun; Xiang-hui Nie; Xiao-sheng Qin; Xiao-dong Zhang

2010-01-01T23:59:59.000Z

177

Management  

E-Print Network (OSTI)

Research has indicated that, depending upon driver and passenger characteristics, passengers can have either a positive or negative influence upon driver behaviour. In conclusion to a recent study investigating the roles that passengers can play to influence, positively and negatively, driver behaviour, Regan and Mitsopoulos (2001) recommended, among other things, that the principles of Crew Resource Management (CRM) training may increase passengers ’ ability to positively influence driver behaviour and also drivers ’ ability to accept constructive feedback. The present study investigated the potential application of CRM training within young driver training in the Australian Capital Territory (ACT). This involved a literature review, an analysis of the differences between the driving and aviation domains, an analysis of the team-based activities and the knowledge, skills and attitudes required during driving to perform those activities, consultation with CRM experts from the aviation and medicine domains and the conduct of six focus groups involving young learner drivers, provisional licence drivers and course teachers. The findings indicate that CRM training as part of young driver training in the ACT is a viable concept to pursue. The application of CRM training within young driver training has potential to significantly enhance the positive and reduce the negative effects of passengers on young driver behaviour, and thus the safety of young drivers and passengers alike. The outcomes of this study formed the basis for a set of recommendations for the development of a young driver CRM training program in the ACT.

Young Drivers; Eve Mitsopoulos; Michael Regan; Janet Anderson; Paul Salmon; Jessica Edquist; Ii Report Documentation Page

2005-01-01T23:59:59.000Z

178

EDS Coal Liquefaction Process Development. Phase V. Laboratory evaluation of the characteristics of EDS Illinois bottoms  

Science Conference Proceedings (OSTI)

This interim report documents work carried out by Combustion Engineering, Inc. under a contract to Exxon Research and Engineering Company to develop a conceptual Hybrid Boiler design fueled by the vacuum distillation residue (vacuum bottoms) derived from Illinois No. 6 coal in the EDS Coal Liquefaction Process. This report was prepared by Combustion Engineering, Inc., and is the first of two reports on the predevelopment phase of the Hybrid Boiler program. This report covers the results of a laboratory investigation to assess the fuel and ash properties of EDS vacuum bottoms. The results of the laboratory testing reported here were used in conjunction with Combustion Engineering's design experience to predict fuel performance and to develop appropriate boiler design parameters. These boiler design parameters were used to prepare the engineering design study reported in EDS Interim Report FE-2893-113, the second of the two reports on the predevelopment phase of the Hybrid Boiler Program. 46 figures, 29 tables.

Lao, T C; Levasseur, A A

1984-02-01T23:59:59.000Z

179

Hybrid Transmission Corridor Study: Volume 1: Phase 1--Scale Model Development  

Science Conference Proceedings (OSTI)

Installation of HVDC transmission lines on existing rights- of-way with HVAC lines can increase power transfer for a given right-of-way width. This phase of the hybrid transmission corridor study developed a model for predicting the electrical effects between HVAC and HVDC lines in a hybrid corridor. The work underscores the importance of maintaining a critical separation between the two lines.

1992-07-14T23:59:59.000Z

180

Sodium-sulfur battery development. Phase VB final report, October 1, 1981--February 28, 1985  

SciTech Connect

This report describes the technical progress made under Contract No. DE-AM04-79CH10012 between the U.S. Department of Energy, Ford Aerospace & Communications Corporations and Ford Motor Company, for the period 1 October 1981 through 28 February 1985, which is designated as Phase VB of the Sodium-Sulfur Battery Development Program. During this period, Ford Aerospace held prime technical responsibility and Ford Motor Company carried out supporting research. Ceramatec, Inc., was a major subcontractor to Ford Aerospace for electrolyte development and production.

1985-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Development of Energy Consumption Database Management System of Existing Large Public Buildings  

E-Print Network (OSTI)

The statistic data of energy consumption are the base of analyzing energy consumption. The scientific management method of energy consumption data and the development of database management system plays an important role in building energy conservation. At present, the large public buildings have been the emphasis of building energy conservation in China. The functions and the basic construction of energy consumption database management system (ECDBMS) for large public buildings are introduced. The ECDBMS is developed by using SQL Server 2000 as the database and PowerBuilder10.0 as the developing tool. It includes five parts such as the basic information of public buildings, the designing parameters of energy-consuming equipments, the operational parameters of energy-consuming equipments, the electric and fuel consumption of buildings, the evaluation of energy efficiency for equipments. The energy consumption database can be accumulated and some functions can be realized by using this database such as the management of building designing parameters and energy consumption data, the evaluation and analysis of building energy consumption.

Li, Y.; Zhang, J.; Sun, D.

2006-01-01T23:59:59.000Z

182

Development of a system dynamics based management flight simulator for new product development  

E-Print Network (OSTI)

All firms in any mature product development industry are being pressured into performing 'better, faster, and cheaper' by both customers and competitors. In short, firms are being tasked with doing more, with less, faster. ...

MacInnis, Daniel V., 1964-

2004-01-01T23:59:59.000Z

183

HEALXH AND SAFEIY RFSEARCH DIVISION Waste Management Research and Development Programs  

Office of Legacy Management (LM)

HEALXH AND SAFEIY RFSEARCH DIVISION HEALXH AND SAFEIY RFSEARCH DIVISION Waste Management Research and Development Programs (Activity No. AH 10 05 00 0; NEAHC01) RADIOLOGICAL SURVEY OFTHE FORMER AEROPROJECTS, FACILITY, WEST cI%mER, PENNSYL.VANIA W. D. Cottrell and R. F. Carrier Date published - October 1990 Investigation Team R. E. Swaja - Measurement Applications and Development Manager W. D. Cottrell - NSRAP Project Director Suwey Team Members J. A Roberts* J. L. Quillent l Bechtel National, Inc tNuclear Fuel Services, Inc Work performed by the MEASUREMENT APPLXATIONS AND DEVELOPMENT GROUP Prepared by the OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 378314285 operated by MARTINMARIEITAENERGYSYSIEM&INC for the U. S. DEF+ARm OF ENERGY under contract DE-ACO5-840R21400 ACKNOWLEDGMENTS ...................

184

Development geology of giant fields on Alaskan North Slope: Key to successful reservoir management  

SciTech Connect

The giant fields on the North Slope of Alaska (combined Permian-Triassic/Lisburne pools at Prudhoe Bay and the Kuparuk River field) produce approximately 2 million BOPD and contain about 30 billion bbl of oil in place. This production rate amounts to almost one-fourth of the US daily production. Because the reservoirs in these fields are complex and the stakes in efficient field management so high, the development geology of these fields presents a great challenge. The technical challenge of managing these fields lies in the fact that secondary and tertiary recovery projects have been initiated soon after start-up to ensure maximum recovery. Thus, the development geologist has to recommend primary development locations while formulating a reservoir description without knowing the full areal extent and heterogeneity of the reservoirs. To support the waterflood and enhanced oil recovery projects, permeability pathways and barriers have been identified using sedimentological, log, and engineering data. Because structure also plays an important role in controlling fluid pathways, the fault geometries, fracture patterns, and detailed structure are being mapped using two-dimensional and three-dimensional seismic, well, and log data. The management challenge of development work in these fields is keeping communications channels open among the development geoscience group and the reservoir, production, operations, and drilling engineers.

Kumar, N. (ARCO Alaska, Inc., Anchorage (USA))

1988-12-01T23:59:59.000Z

185

Development and evaluation of a workpiece temperature analyzer (WPTA) for industrial furances (Phase 1)  

Science Conference Proceedings (OSTI)

This project is directed toward the research, development, and evaluation of a viable commercial product-a workpiece temperature measurement analyzer (WPTA) for fired furnaces based on unique radiation properties of surfaces. This WPTA will provide for more uniform, higher quality products and reduce product rejects as well as permit the optimum use of energy. The WPTA may also be utilized in control system applications including metal heat treating, forging furnaces, and ceramic firing furnaces. A large market also exists in the chemical process and refining industry. WPTA applications include the verification of product temperature/time cycles, and use as a front-end sensor for automatic feedback control systems. This report summarizes the work performed in Phase 1 of this three-phase project. The work Phase 1 included the application evaluation; the evaluation of present technologies and limitations; and the development of a preliminary conceptual WPTA design, including identification of technical and economic benefits. Recommendations based on the findings of this report include near-term enhancement of the capabilities of the Pyrolaser, and long-term development of an instrument based on Raman Spectroscopy. Development of the Pyrofiber, fiberoptics version of the Pyrolaser, will be a key to solving present problems involving specularity, measurement angle, and costs of multipoint measurement. Extending the instrument's measurement range to include temperatures below 600{degrees}C will make the product useful for a wider range of applications. The development of Raman Spectroscopy would result in an instrument that could easily be adapted to incorporate a wealth of additional nondestructive analytical capabilities, including stress/stain indication, crystallography, species concentrations, corrosion studies, and catalysis studies, in addition to temperature measurement. 9 refs., 20 figs., 16 tabs.

Not Available

1991-10-01T23:59:59.000Z

186

Guntong field: Development and management of a multiple-reservoir offshore waterflood  

SciTech Connect

The Guntong field, the largest waterflood field in offshore peninsular Malaysia, with an oil-in-place (OIP) of about 200 million m{sup 3}, has been producing since 1985. The field contains 13 stacked reservoirs with small gas caps and limited aquifer support. This paper describes some of the significant reservoir, geologic, and facility challenges faced during development and management of this complex reservoir system. A combination of five-spot and peripheral waterflood patterns was selected to provide the required areal coverage, and reservoirs were commingled into two operational groups. Key reservoir management strategies to maximize performance include determination of optimum target reservoir pressures, use of a PC-based program to guide production and injection targets, and meeting pattern-balancing and capacity-enhancement programs. The response to the reservoir management efforts has been favorable, with an all-time-high production rate of 14,000 m{sup 3}/d recorded in 1994.

Chik, A.N.; Selamat, S.; Elias, M.R.; White, J.P.; Wakatake, M.T.

1996-12-01T23:59:59.000Z

187

Two-phase anaerobic digestion within a solid waste/wastewater integrated management system  

SciTech Connect

A two-phase, wet anaerobic digestion process was tested at laboratory scale using mechanically pre-treated municipal solid waste (MSW) as the substrate. The proposed process scheme differs from others due to the integration of the MSW and wastewater treatment cycles, which makes it possible to avoid the recirculation of process effluent. The results obtained show that the supplying of facultative biomass, drawn from the wastewater aeration tank, to the solid waste acidogenic reactor allows an improvement of the performance of the first phase of the process which is positively reflected on the second one. The proposed process performed successfully, adopting mesophilic conditions and a relatively short hydraulic retention time in the methanogenic reactor, as well as high values of organic loading rate. Significant VS removal efficiency and biogas production were achieved. Moreover, the methanogenic reactor quickly reached optimal conditions for a stable methanogenic phase. Studies conducted elsewhere also confirm the feasibility of integrating the treatment of the organic fraction of MSW with that of wastewater.

De Gioannis, G. [DIGITA, Department of Geoengineering and Environmental Technologies, University of Cagliari, Piazza D'Armi 09123 Cagliari (Italy); Diaz, L.F. [CalRecovery, Inc., 2454 Stanwell Drive, Concord, California 94520 (United States); Muntoni, A. [DIGITA, Department of Geoengineering and Environmental Technologies, University of Cagliari, Piazza D'Armi 09123 Cagliari (Italy)], E-mail: amuntoni@unica.it; Pisanu, A. [DIGITA, Department of Geoengineering and Environmental Technologies, University of Cagliari, Piazza D'Armi 09123 Cagliari (Italy)

2008-07-01T23:59:59.000Z

188

Science and Technology Development to Integrate Energy Production and Greenhouse Gas Management  

SciTech Connect

This paper reviews the carbon cycle from the point of view of past and present human influence. Potential future human input to the cycle through science and technology to manage atmospheric greenhouse gas are considered. The review suggests that humans will need to ingeniously exploit even more energy to integrate its use with control of atmospheric greenhouse gases. Continuing development and application of energy is essential if the development of human society is to be sustained through the coming centuries. The continuing development of nuclear energy seems an essential energy supply component.

Pendergast, D.

2004-10-03T23:59:59.000Z

189

Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements  

SciTech Connect

This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

Custer, W.R. Jr.; Messick, C.D.

1996-03-31T23:59:59.000Z

190

Conjunctive Surface and Groundwater Management in Utah: Implications for Oil Shale and Oil Sands Development  

Science Conference Proceedings (OSTI)

Unconventional fuel development will require scarce water resources. In an environment characterized by scarcity, and where most water resources are fully allocated, prospective development will require minimizing water use and seeking to use water resources in the most efficient manner. Conjunctive use of surface and groundwater provides just such an opportunity. Conjunctive use includes two main practices: First, integrating surface water diversions and groundwater withdrawals to maximize efficiency and minimize impacts on other resource users and ecological processes. Second, conjunctive use includes capturing surplus or unused surface water and injecting or infiltrating that water into groundwater aquifers in order to increase recharge rates. Conjunctive management holds promise as a means of addressing some of the West's most intractable problems. Conjunctive management can firm up water supplies by more effectively capturing spring runoff and surplus water, and by integrating its use with groundwater withdrawals; surface and groundwater use can be further integrated with managed aquifer recharge projects. Such integration can maximize water storage and availability, while simultaneously minimizing evaporative loss, reservoir sedimentation, and surface use impacts. Any of these impacts, if left unresolved, could derail commercial-scale unconventional fuel development. Unconventional fuel developers could therefore benefit from incorporating conjunctive use into their development plans. Despite its advantages, conjunctive use is not a panacea. Conjunctive use means using resources in harmony to maximize and stabilize long-term supplies â?? it does not mean maximizing the use of two separate but interrelated resources for unsustainable short-term gains â?? and it cannot resolve all problems or provide water where no unappropriated water exists. Moreover, conjunctive use may pose risks to ecological values forgone when water that would otherwise remain in a stream is diverted for aquifer recharge or other uses. To better understand the rapidly evolving field of conjunctive use, this Topical Report begins with a discussion of Utah water law, with an emphasis on conjunctive use issues. We contrast Utahâ??s approach with efforts undertaken in neighboring states and by the federal government. We then relate conjunctive use to the unconventional fuel industry and discuss how conjunctive use can help address pressing challenges. While conjunctive management cannot create water where none exists, it does hold promise to manage existing resources in a more efficient manner. Moreover, conjunctive management reflects an important trend in western water law that could provide benefit to those contemplating activities that require large-scale water development.

Robert Keiter; John Ruple; Heather Tanana; Rebecca Holt

2012-04-15T23:59:59.000Z

191

Underground natural gas storage reservoir management: Phase 2. Final report, June 1, 1995--March 30, 1996  

SciTech Connect

Gas storage operators are facing increased and more complex responsibilities for managing storage operations under Order 636 which requires unbundling of storage from other pipeline services. Low cost methods that improve the accuracy of inventory verification are needed to optimally manage this stored natural gas. Migration of injected gas out of the storage reservoir has not been well documented by industry. The first portion of this study addressed the scope of unaccounted for gas which may have been due to migration. The volume range was estimated from available databases and reported on an aggregate basis. Information on working gas, base gas, operating capacity, injection and withdrawal volumes, current and non-current revenues, gas losses, storage field demographics and reservoir types is contained among the FERC Form 2, EIA Form 191, AGA and FERC Jurisdictional databases. The key elements of this study show that gas migration can result if reservoir limits have not been properly identified, gas migration can occur in formation with extremely low permeability (0.001 md), horizontal wellbores can reduce gas migration losses and over-pressuring (unintentionally) storage reservoirs by reinjecting working gas over a shorter time period may increase gas migration effects.

Ortiz, I.; Anthony, R.V.

1996-12-31T23:59:59.000Z

192

Demand Management Demonstration Project, Stage 5: development of industrial load simulation model. Executive summary. Final report  

SciTech Connect

The purpose of this project was to design, develop, test and document a computer simulation model of electric utility generating costs required to meet industrial power demands and the effects of utility load management on these generating costs. The results showed that the model developed is a well conceived load management testing, marginal costing tool. What if situations can be readily tested to determine their impact on system profile and short run marginal costs. The terms unshaped and shaped refer to customers or system use patterns before and after some load management technique was tested. The total flexibility of the model is only apparent after the user has studied test runs in detail. Hourly marginal costs reveal many unexpected changes as a result of shaping loads. Other unexpected changes due to varying economic dispatch schedules while shaping, illustrate the unprecedental latitude for the user to explore optimum generation and load management combinations. The general concept of the model is depicted in the flow chart on the next page.

1977-04-01T23:59:59.000Z

193

DESIGN AND DEVELOPMENT OF GAS-LIQUID CYLINDRICAL CYCLONE COMPACT SEPARATORS FOR THREE-PHASE FLOW  

SciTech Connect

This report presents a brief overview of the activities and tasks accomplished during the second half year (April 1, 2001-September 30, 2001) of the fourth project year budget period (October 1, 2000-September 30, 2001). An executive summary is presented initially followed by the tasks of the current budget period. Then, detailed description of the experimental and modeling investigations are presented. Subsequently, the technical and scientific results of the activities of this project period are presented with some discussions. The findings of this investigation are summarized in the ''Conclusions'' section followed by relevant references. The fourth project year activities are divided into three main parts, which are carried out in parallel. The first part is continuation of the experimental program that includes a study of the oil/water two-phase behavior at high pressures and control system development for the three-phase GLCC{copyright}. This investigation will be eventually extended for three-phase flow. The second part consists of the development of a simplified mechanistic model incorporating the experimental results and behavior of dispersion of oil in water and water in oil. This will provide an insight into the hydrodynamic flow behavior and serve as the design tool for the industry. Although useful for sizing GLCC{copyright} for proven applications, the mechanistic model will not provide detailed hydrodynamic flow behavior information needed to screen new geometric variations or to study the effect of fluid property variations. Therefore, in the third part, the more rigorous approach of computational fluid dynamics (CFD) will be utilized. Multidimensional multiphase flow simulation at high pressures and for real crude conditions will provide much greater depth into the understanding of the physical phenomena and the mathematical analysis of three-phase GLCC{copyright} design and performance.

Dr. Ram S. Mohan; Dr. Ovadia Shoham

2001-10-30T23:59:59.000Z

194

DESIGN AND DEVELOPMENT OF GAS-LIQUID CYLINDRICAL CYCLONE COMPACT SEPARATORS FOR THREE-PHASE FLOW  

SciTech Connect

This report presents a brief overview of the activities and tasks accomplished during the first half year (October 1, 2000-March 31, 2001) of the fourth project year budget period (October 1, 2000-September 30, 2001). An executive summary is presented initially followed by the tasks of the current budget period. Then, detailed description of the experimental and modeling investigations are presented. Subsequently, the technical and scientific results of the activities of this project period are presented with some discussions. The findings of this investigation are summarized in the ''Conclusions'' section followed by relevant references. The fourth project year activities are divided into three main parts, which are carried out in parallel. The first part is continuation of the experimental program that includes a study of the oil/water two-phase behavior at high pressures and control system development for the three-phase GLCC{copyright}. This investigation will be eventually extended for three-phase flow. The second part consists of the development of a simplified mechanistic model incorporating the experimental results and behavior of dispersion of oil in water and water in oil. This will provide an insight into the hydrodynamic flow behavior and serve as the design tool for the industry. Although useful for sizing GLCC{copyright} for proven applications, the mechanistic model will not provide detailed hydrodynamic flow behavior information needed to screen new geometric variations or to study the effect of fluid property variations. Therefore, in the third part, the more rigorous approach of computational fluid dynamics (CFD) will be utilized. Multidimensional multiphase flow simulation at high pressures and for real crude conditions will provide much greater depth into the understanding of the physical phenomena and the mathematical analysis of three-phase GLCC{copyright} design and performance.

Dr. Ram S. Mohan; Dr. Ovadia Shoham

2001-04-30T23:59:59.000Z

195

Strategy for Developing 10-Year Energy Management Plans at U.S. Army Forces Command Installations.  

SciTech Connect

In order to reach the energy reduction and sustainability goals of the Executive Order 13123, and to minimize overall energy and water costs, the U.S Army Forces Command (FORSCOM), with assistance of PNNL, has embarked on a program to develop comprehensive 10-year Energy Management Plans for each of the 11 major FORSCOM installations. These plans will identify activities and projects critical to the installation's reaching the Executive Order (E.O.) goals as well as help ensure a reliable and secure energy supply. Each FORSCOM installation will be responsible for developing a plan that is closely linked with the installation Master Plan. The Energy Management Plan will cover elements on both the demand side and the supply side, as well as energy/water security assessments and funding/financing resource requirements.

Parker, Graham B. (BATTELLE (PACIFIC NW LAB)); Gillespie, Adrian (U.S. Army Forces Command); Dixon, Douglas R. (BATTELLE (PACIFIC NW LAB)); Brown, Daryl R. (BATTELLE (PACIFIC NW LAB)); Reilly, Raymond W. (BATTELLE (PACIFIC NW LAB)); Warwick, William M. (BATTELLE (PACIFIC NW LAB))

2002-10-01T23:59:59.000Z

196

DEVELOPMENT OF A CARBON MANAGEMENT GEOGRAPHIC INFORMATION SYSTEM (GIS) FOR THE UNITED STATES  

Science Conference Proceedings (OSTI)

The Lab for Energy and Environment (LFEE) at MIT is developing a Geographic Information System (GIS) for carbon management. The GIS will store, integrate, and manipulate information relating to the components of carbon management systems. Additionally, the GIS can be used to interpret and analyze the effect of developing these systems. In the first year of this three year project, we focused on two tasks: (1) specifying the system design--defining in detail the GIS data requirements, the types of analyses that can be conducted, and the forms of output we will produce, as well as designing the computer architecture of the GIS and (2) creating the ''core'' datasets--identifying data sources and converting them into a form accessible by the GIS.

Howard J. Herzog

2004-03-01T23:59:59.000Z

197

Ocean Thermal Energy Conversion power system development. Phase I: preliminary design. Final report  

DOE Green Energy (OSTI)

Westinghouse has completed the Preliminary Design Phase for the Power System Development of the Ocean Thermal Energy Conversion (OTEC) Demonstration Plant project. This study included the development of a preliminary design for a Modular Application scaled power system (10MWe) and Heat Exchanger Test Articles, both based on the concept developed in the Conceptual Design Phase. The results of this study were used to improve the baseline design of the 50MWe module for the Commercial Size Power System, which was recommended for the demonstration plant by the conceptual design study. The 50MWe module was selected since it has the lowest cost, and since its size convincingly demonstrates that future economically viable commercial plants, having reliable operation with credible anticipated costs, are possible. Additional optimization studies on the size of the power system plus hull continue to identify 50MWe as the preferred minimum cost configuration. This study was limited to a closed cycle ammonia power system module, using a seawater temperature difference of 40/sup 0/F, and a surface platform/ship reference hull. This volume describes system operation, a complete test program to verify mechanical reliability and thermal performance, fabrication and installation operations, and a cost analysis. (WHK)

Not Available

1978-12-04T23:59:59.000Z

198

Ocean Thermal Energy Conversion power system development. Phase I: preliminary design. Final report  

DOE Green Energy (OSTI)

Westinghouse has completed the Preliminary Desigh Phase for the Power System Development of the Ocean Thermal Energy Conversion (OTEC) Demonstration Plant project. This study included the development of a preliminary design for a Modular Application scaled power system (10MWe) and Heat Exchanger Test Articles, both based on the concept developed in the Conceptual Design Phase. The results of this study were used to improve the baseline design of the 50MWe module for the Commercial Size Power System, which was recommended for the demonstration plant by the conceptual design study. The 50MWe module was selected since it has the lowest cost, and since its size convincingly demonstrates that future economically viable commercial plants, having reliable operation with credible anticipated costs, are possible. Additional optimization studies on the size of the power system plus hull continue to identify 50MWe as the preferred minimum cost configuration. This study was limited to a closed cycle ammonia power system module, using a seawater temperature difference of 40/sup 0/F, and a surface platform/ship reference hull. This volume presents the preliminary design configuration and system optimization. (WHK)

Not Available

1978-12-04T23:59:59.000Z

199

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was completed. The project was then re-directed to the making of iron units. U.S. Steel teamed up with Calderon for a joint effort which will last 30 months to produce directly reduced iron with the potential of converting it into molten iron (hot metal) consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy. The work which is labeled as Phase II will take place at two levels; namely, the bench scale level and the process development unit (PDU) level. The bench scale work is being divided into two parts; the construction and operation of Bench Scale No.1 to make hot metal direct as one part and the construction and operation of Bench Scale No.2 to make DRI with its conversion to hot metal as the second part. The work at the PDU consists of getting the PDU which exists ready for advancing the activities from bench scale to PDU level.

Albert Calderon

2001-10-24T23:59:59.000Z

200

Phase I of the Near-Term Hybrid Passenger-Vehicle Development Program. Final report  

DOE Green Energy (OSTI)

Under contract to the Jet Propulsion Laboratory of the California Institute of Technology, Minicars conducted Phase I of the Near-Term Hybrid Passenger Vehicle (NTHV) Development Program. This program led to the preliminary design of a hybrid (electric and internal combustion engine powered) vehicle and fulfilled the objectives set by JPL. JPL requested that the report address certain specific topics. A brief summary of all Phase I activities is given initially; the hybrid vehicle preliminary design is described in Sections 4, 5, and 6. Table 2 of the Summary lists performance projections for the overall vehicle and some of its subsystems. Section 4.5 gives references to the more-detailed design information found in the Preliminary Design Data Package (Appendix C). Alternative hybrid-vehicle design options are discussed in Sections 3 through 6. A listing of the tradeoff study alternatives is included in Section 3. Computer simulations are discussed in Section 9. Section 8 describes the supporting economic analyses. Reliability and safety considerations are discussed specifically in Section 7 and are mentioned in Sections 4, 5, and 6. Section 10 lists conclusions and recommendations arrived at during the performance of Phase I. A complete bibliography follows the list of references.

Not Available

1980-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Trends Affecting Building Control System Development: Trends in Energy Management Technology  

E-Print Network (OSTI)

vehicles. ) Computerized Maintenance Managementaided facility management and maintenance systems (CAFM/Maintenance work order generation and dispatch management;

Collins, Ted; Parker, Steven A.; Webster, Tom

2002-01-01T23:59:59.000Z

202

DOE SBIR Phase-1 Report on Hybrid CPU-GPU Parallel Development of the Eulerian-Lagrangian Barracuda Multiphase Program  

DOE Green Energy (OSTI)

This report gives the result from the Phase-1 work on demonstrating greater than 10x speedup of the Barracuda computer program using parallel methods and GPU processors (General-Purpose Graphics Processing Unit or Graphics Processing Unit). Phase-1 demonstrated a 12x speedup on a typical Barracuda function using the GPU processor. The problem test case used about 5 million particles and 250,000 Eulerian grid cells. The relative speedup, compared to a single CPU, increases with increased number of particles giving greater than 12x speedup. Phase-1 work provided a path for reformatting data structure modifications to give good parallel performance while keeping a friendly environment for new physics development and code maintenance. The implementation of data structure changes will be in Phase-2. Phase-1 laid the ground work for the complete parallelization of Barracuda in Phase-2, with the caveat that implemented computer practices for parallel programming done in Phase-1 gives immediate speedup in the current Barracuda serial running code. The Phase-1 tasks were completed successfully laying the frame work for Phase-2. The detailed results of Phase-1 are within this document. In general, the speedup of one function would be expected to be higher than the speedup of the entire code because of I/O functions and communication between the algorithms. However, because one of the most difficult Barracuda algorithms was parallelized in Phase-1 and because advanced parallelization methods and proposed parallelization optimization techniques identified in Phase-1 will be used in Phase-2, an overall Barracuda code speedup (relative to a single CPU) is expected to be greater than 10x. This means that a job which takes 30 days to complete will be done in 3 days. Tasks completed in Phase-1 are: Task 1: Profile the entire Barracuda code and select which subroutines are to be parallelized (See Section Choosing a Function to Accelerate) Task 2: Select a GPU consultant company and jointly parallelize subroutines (CPFD chose the small business EMPhotonics for the Phase-1 the technical partner. See Section Technical Objective and Approach) Task 3: Integrate parallel subroutines into Barracuda (See Section Results from Phase-1 and its subsections) Task 4: Testing, refinement, and optimization of parallel methodology (See Section Results from Phase-1 and Section Result Comparison Program) Task 5: Integrate Phase-1 parallel subroutines into Barracuda and release (See Section Results from Phase-1 and its subsections) Task 6: Roadmap of Phase-2 (See Section Plan for Phase-2) With the completion of Phase 1 we have the base understanding to completely parallelize Barracuda. An overview of the work to move Barracuda to a parallelized code is given in Plan for Phase-2.

Dr. Dale M. Snider

2011-02-28T23:59:59.000Z

203

LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN CONSTRAINTS, AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAH’S UINTA BASIN  

Science Conference Proceedings (OSTI)

Utah is rich in oil shale and oil sands resources. Chief among the challenges facing prospective unconventional fuel developers is the ability to access these resources. Access is heavily dependent upon land ownership and applicable management requirements. Understanding constraints on resource access and the prospect of consolidating resource holdings across a fragmented management landscape is critical to understanding the role Utah’s unconventional fuel resources may play in our nation’s energy policy. This Topical Report explains the historic roots of the “crazy quilt” of western land ownership, how current controversies over management of federal public land with wilderness character could impact access to unconventional fuels resources, and how land exchanges could improve management efficiency. Upon admission to the Union, the State of Utah received the right to title to more than one-ninth of all land within the newly formed state. This land is held in trust to support public schools and institutions, and is managed to generate revenue for trust beneficiaries. State trust lands are scattered across the state in mostly discontinuous 640-acre parcels, many of which are surrounded by federal land and too small to develop on their own. Where state trust lands are developable but surrounded by federal land, federal land management objectives can complicate state trust land development. The difficulty generating revenue from state trust lands can frustrate state and local government officials as well as citizens advocating for economic development. Likewise, the prospect of industrial development of inholdings within prized conservation landscapes creates management challenges for federal agencies. One major tension involves whether certain federal public lands possess wilderness character, and if so, whether management of those lands should emphasize wilderness values over other uses. On December 22, 2010, Secretary of the Interior Ken Salazar issued Secretarial Order 3310, Protecting Wilderness Characteristics on Lands Managed by the Bureau of Land Management. Supporters argue that the Order merely provides guidance regarding implementation of existing legal obligations without creating new rights or duties. Opponents describe Order 3310 as subverting congressional authority to designate Wilderness Areas and as closing millions of acres of public lands to energy development and commodity production. While opponents succeeded in temporarily defunding the Order’s implementation and forcing the Bureau of Land Management (BLM) to adopt a more collaborative approach, the fundamental questions remain: Which federal public lands possess wilderness characteristics and how should those lands be managed? The closely related question is: How might management of such resources impact unconventional fuel development within Utah? These questions remain pressing independent of the Order because the BLM, which manages the majority of federal land in Utah, is statutorily obligated to maintain an up-to-date inventory of federal public lands and the resources they contain, including lands with wilderness characteristics. The BLM is also legally obligated to develop and periodically update land use plans, relying on information obtained in its public lands inventory. The BLM cannot sidestep these hard choices, and failure to consider wilderness characteristics during the planning process will derail the planning effort. Based on an analysis of the most recent inventory data, lands with wilderness characteristics — whether already subject to mandatory protection under the Wilderness Act, subject to discretionary protections as part of BLM Resource Management Plan revisions, or potentially subject to new protections under Order 3310 — are unlikely to profoundly impact oil shale development within Utah’s Uinta Basin. Lands with wilderness characteristics are likely to v have a greater impact on oil sands resources, particularly those resources found in the southern part of the state. Management requirements independent of l

Keiter, Robert; Ruple, John; Holt, Rebecca; Tanana, Heather; McNeally, Phoebe; Tribby, Clavin

2012-10-01T23:59:59.000Z

204

Automated energy management systems for small buildings. Volume II: market assessment reports, Phase I and II. Final report  

SciTech Connect

Marketec, Inc., as part of a Honeywell research project sponsored by the Department of Energy (DOE), studied the major marketing influences affecting purchasing decisions for a new product concept - an Automated Energy Management System (AEMS). The first part of this study, designated Phase One, deals with four broad assessments of market need for an AEMS within the market segment generally defined as small buildings (75,000 square feet or less). Thus, determinations were made, using carefully selected focus groups, of the following issues: (1) market perception of the market segment in particular; (2) attitudinal statements concerning the solution of these problems; (3) current and projected energy-saving practices by the respondents from the market segment; and (4) an estimate of market potential of an AEMS from an analysis of the focus groups. The second phase of this investigation deals with larger national samplings from the same market segments and uses a questionnaire technique. Three small building sectors were chosen to represent the total small-building market: (1) apartments, (2) schools, and (3) offices. In the aggregate, these three sectors represent 50% or more of the energy consumed, square footage, and number of buildings of that total market.

1978-08-01T23:59:59.000Z

205

Phase I Water Rental Pilot Project : Snake River Resident Fish and Wildlife Resources and Management Recommendations.  

DOE Green Energy (OSTI)

The Idaho Water Rental Pilot Project was implemented as a part of the Non-Treaty Storage Fish and Wildlife Agreement (NTSA) between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to improve juvenile and adult salmon and steelhead passage in the lower Snake River with the use of rented water for flow augmentation. The primary purpose of this project is to summarize existing resource information and provide recommendations to protect or enhance resident fish and wildlife resources in Idaho with actions achieving flow augmentation for anadromous fish. Potential impacts of an annual flow augmentation program on Idaho reservoirs and streams are modeled. Potential sources of water for flow augmentation and operational or institutional constraints to the use of that water are identified. This report does not advocate flow augmentation as the preferred long-term recovery action for salmon. The state of Idaho strongly believes that annual drawdown of the four lower Snake reservoirs is critical to the long-term enhancement and recovery of salmon (Andrus 1990). Existing water level management includes balancing the needs of hydropower production, irrigated agriculture, municipalities and industries with fish, wildlife and recreation. Reservoir minimum pool maintenance, water quality and instream flows are issues of public concern that will be directly affected by the timing and quantity of water rental releases for salmon flow augmentation, The potential of renting water from Idaho rental pools for salmon flow augmentation is complicated by institutional impediments, competition from other water users, and dry year shortages. Water rental will contribute to a reduction in carryover storage in a series of dry years when salmon flow augmentation is most critical. Such a reduction in carryover can have negative impacts on reservoir fisheries by eliminating shoreline spawning beds, reducing available fish habitat, and exacerbating adverse water quality conditions. A reduction in carry over can lead to seasonal reductions in instream flows, which may also negatively affect fish, wildlife, and recreation in Idaho. The Idaho Water Rental Pilot Project does provide opportunities to protect and enhance resident fish and wildlife habitat by improving water quality and instream flows. Control of point sources, such as sewage and industrial discharges, alone will not achieve water quality goals in Idaho reservoirs and streams. Slow, continuous releases of rented water can increase and stabilize instream flows, increase available fish and wildlife habitat, decrease fish displacement, and improve water quality. Island integrity, requisite for waterfowl protection from mainland predators, can be maintained with improved timing of water releases. Rebuilding Snake River salmon and steelhead runs requires a cooperative commitment and increased flexibility in system operations to increase flow velocities for fish passage and migration. Idaho's resident fish and wildlife resources require judicious management and a willingness by all parties to liberate water supplies equitably.

Riggin, Stacey H.; Hansen, H. Jerome

1992-10-01T23:59:59.000Z

206

EMSL Research and Capability Development Proposals Facility-Wide Management and Storage for Scientific Data  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility-Wide Management and Storage for Scientific Data Facility-Wide Management and Storage for Scientific Data Project Start Date: Summer 2008 EMSL Lead Investigator Ken Auberry Instrumentation Development Laboratory, EMSL, PNNL As greater numbers of collaborators, journals, and funding agencies require data retention associated with a given project, preservation of experimentally generated results has become an increasingly important challenge in science. In many small- to medium-scale laboratory environments, this task has traditionally been carried out using offline optical media (recordable CDs and DVDs) or externally connected commercial hard drive units. Along with the raw storage issues that must be addressed, additional challenges await in the correlation of stored data to contextual information about the experiments and

207

The development of a methodology to quantify the impacts of information management strategies on EPC projects  

E-Print Network (OSTI)

This research develops and demonstrates a methodology to quantify time and cost impacts on Engineering, Procurement, and Construction (EPC) projects resulting from information management driven process changes in design related activities. Many companies have implemented information technologies expecting to save time and effort, gain competitive advantage, improve productivity, better align objectives, and improve product quality. The premise of this research is that these benefits can be quantified in terms of time and cost project performance measures. While previous efforts to quantify benefits have been function-or technology-specific, and have provided sub-optimal results, the methodology presented allows quantification at a total project level. A schematic representation of the EPC Process was developed and field data from both owner and contractor companies was collected to serve as a baseline condition. Fifteen specific design related activities were modeled in detail and also loaded with associated field collected time and cost data. Potential process changes from increasing levels of information management were investigated. Monte Carlo simulation was used as the means by which time and cost impacts of the process changes were observed and measured. The impacts found in the specific design activities were used to adjust the baseline condition of the EPC process. Resimulation of the total process enabled quantification of impacts at a project level. The results of the research demonstrated that potential impacts from information management can be quantified. The results also showed that very aggressive levels of information management improvements may potentially improve total project activity time and labor cost by 7% and 8%, respectively. More conservative changes showed impacts to the same parameters at approximately 3% and 1%. The research also provided an indication of the relative impact various level of information management may have on project elapsed time. Finally, the research illustrated the importance of measuring the impacts at a total project-level. That is, the magnitude of impacts at the project-level were much lower than those observed at the activity or task level, thus providing a more realistic approximation of information management impacts.

Moreau, Karen Anne

1997-01-01T23:59:59.000Z

208

Development of the Office of Civilian Radioactive Waste Management National Transportation Plan  

Science Conference Proceedings (OSTI)

The Director of the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) designated development of the National Transportation Plan (NTP) as one of his four strategic objectives for the program. The Office of Logistics Management (OLM) within OCRWM was tasked to develop the plan, which will accommodate state, local, and tribal concerns and input to the greatest extent practicable. The plan will describe each element of the national transportation system that OCRWM is developing for shipping spent nuclear fuel and high-level radioactive waste to the proposed geologic repository at Yucca Mountain, Nevada. The plan will bring together OCRWM's approach for acquiring capital assets (casks, rail cars, and a rail line in Nevada) and its operational planning efforts in a single, comprehensive document. It will also provide a timetable for major transportation decisions and milestones needed to support a 2017 start date for shipments to the Yucca Mountain repository. The NTP will be revised to incorporate new developments and decisions as they are finalized. This paper will describe the elements of the NTP, its importance in providing a comprehensive overview of the national transportation system, and the role of stakeholders in providing input on the NTP and the national transportation system. (authors)

Macaluso, C. [U.S. Department of Energy, Office of Civilian Radioactive Waste Management, Washington, DC (United States); Offner, J.; Patric, J. [Booz Allen Hamilton, Washington, DC (United States)

2008-07-01T23:59:59.000Z

209

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT WASTE PROCESSING ANNUAL TECHNOLOGY DEVELOPMENT REPORT 2008  

SciTech Connect

The Office of Waste Processing identifies and reduces engineering and technical risks and uncertainties of the waste processing programs and projects of the Department of Energy's Environmental Management (EM) mission through the timely development of solutions to technical issues. The risks, and actions taken to mitigate those risks, are determined through technology readiness assessments, program reviews, technology information exchanges, external technical reviews, technical assistance, and targeted technology development and deployment. The Office of Waste Processing works with other DOE Headquarters offices and project and field organizations to proactively evaluate technical needs, identify multi-site solutions, and improve the technology and engineering associated with project and contract management. Participants in this program are empowered with the authority, resources, and training to implement their defined priorities, roles, and responsibilities. The Office of Waste Processing Multi-Year Program Plan (MYPP) supports the goals and objectives of the U.S. Department of Energy (DOE) - Office of Environmental Management Engineering and Technology Roadmap by providing direction for technology enhancement, development, and demonstration that will lead to a reduction of technical risks and uncertainties in EM waste processing activities. The MYPP summarizes the program areas and the scope of activities within each program area proposed for the next five years to improve safety and reduce costs and environmental impacts associated with waste processing; authorized budget levels will impact how much of the scope of activities can be executed, on a year-to-year basis. Waste Processing Program activities within the Roadmap and the MYPP are described in these seven program areas: (1) Improved Waste Storage Technology; (2) Reliable and Efficient Waste Retrieval Technologies; (3) Enhanced Tank Closure Processes; (4) Next-Generation Pretreatment Solutions; (5) Enhanced Stabilization Technologies; (6) Spent Nuclear Fuel; and (7) Challenging Materials. This report provides updates on 35 technology development tasks conducted during calendar year 2008 in the Roadmap and MYPP program areas.

Bush, S.

2009-11-05T23:59:59.000Z

210

Development of a Total Energy, Environment and Asset Management (TE2AM tm) Curriculum  

Science Conference Proceedings (OSTI)

The University of Wisconsin Department of Engineering Professional Development (EPD) has completed the sponsored project entitled, Development of a Total Energy, Environment and Asset Management (TE2AM™) Curriculum. The project involved the development of a structured professional development program to improve the knowledge, skills, capabilities, and competencies of engineers and operators of commercial buildings. TE2AM™ advances a radically different approach to commercial building design, operation, maintenance, and end-­?of-­?life disposition. By employing asset management principles to the lifecycle of a commercial building, owners and occupants will realize improved building performance, reduced energy consumption and positive environmental impacts. Through our commercialization plan, we intend to offer TE2AM™ courses and certificates to the professional community and continuously improve TE2AM™ course materials. The TE2AM™ project supports the DOE Strategic Theme 1 -­? Energy Security; and will further advance the DOE Strategic Goal 1.4 Energy Productivity. Through participation in the TE2AM™ curriculum, engineers and operators of commercial buildings will be eligible for a professional certificate; denoting the completion of a prescribed series of learning activities. The project involved a comprehensive, rigorous approach to curriculum development, and accomplished the following goals: 1. Identify, analyze and prioritize key learning needs of engineers, architects and technical professionals as operators of commercial buildings. 2. Design and develop TE2AM™ curricula and instructional strategies to meet learning needs of the target learning community. 3. Establish partnerships with the sponsor and key stakeholders to enhance the development and delivery of learning programs. 4. Successfully commercialize and sustain the training and certificate programs for a substantial time following the term of the award. The project team was successful in achieving the goals and deliverables set forth in the original proposal. Though attempts were made to adhere to the original project timeline, the team requested, and was granted a 6-­?month project extension, during which time the project was completed.

None

2012-12-31T23:59:59.000Z

211

EPRI Pre-Conference Workshop: Active Distribution System Management for Integration of Distributed Resources Research, Development a nd Demonstration Needs  

Science Conference Proceedings (OSTI)

This report documents the proceedings of the EPRI Pre-Conference Workshop: Active Distribution System Management for Integration of Distributed ResourcesResearch, Development and Demonstration Needs, held December 9, 2008. This workshop presented over 20 projects related to active distribution management for distributed energy resource (DER) integration.

2009-04-27T23:59:59.000Z

212

Production of ethanol from refinery waste gases. Phase 2, technology development, annual report  

DOE Green Energy (OSTI)

Oil refineries discharge large volumes of H{sub 2}, CO, and CO{sub 2} from cracking, coking, and hydrotreating operations. This program seeks to develop a biological process for converting these waste gases into ethanol, which can be blended with gasoline to reduce emissions. Production of ethanol from all 194 US refineries would save 450 billion BTU annually, would reduce crude oil imports by 110 million barrels/year and emissions by 19 million tons/year. Phase II efforts has yielded at least 3 cultures (Clostridium ljungdahlii, Isolate O-52, Isolate C-01) which are able to produce commercially viable concentrations of ethanol from CO, CO{sub 2}, and H{sub 2} in petroleum waste gas. Single continuous stirred tank reactor studies have shown that 15-20 g/L of ethanol can be produced, with less than 5 g/L acetic acid byproduct. Culture and reactor optimization in Phase III should yield even higher ethanol concentrations and minimal acetic acid. Product recovery studies showed that ethanol is best recovered in a multi-step process involving solvent extraction/distillation to azeotrope/azeotropic distillation or pervaporation, or direct distillation to the azeotrope/azeotropic distillation or pervaporation. Projections show that the ethanol facility for a typical refinery would require an investment of about $30 million, which would be returned in less than 2 years.

Arora, D.; Basu, R.; Phillips, J.R.; Wikstrom, C.V.; Clausen, E.C.; Gaddy, J.L.

1995-07-01T23:59:59.000Z

213

Idaho Chemical Processing Plant spent fuel and waste management technology development program plan: 1994 Update  

SciTech Connect

The Department of Energy has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until April 1992, the major activity of the ICPP was the reprocessing of SNF to recover fissile uranium and the management of the resulting high-level wastes (HLW). In 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the continued safe management and disposition of SNF and radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste), 3,800 cubic meters of calcine waste, and 289 metric tons heavy metal of SNF are in inventory at the ICPP. Disposal of SNF and high-level waste (HLW) is planned for a repository. Preparation of SNF, HLW, and other radioactive wastes for disposal may include mechanical, physical, and/or chemical processes. This plan outlines the program strategy of the ICPP spent Fuel and Waste Management Technology Development Program (SF&WMTDP) to develop and demonstrate the technology required to ensure that SNF and radioactive waste will be properly stored and prepared for final disposal in accordance with regulatory drivers. This Plan presents a brief summary of each of the major elements of the SF&WMTDP; identifies key program assumptions and their bases; and outlines the key activities and decisions that must be completed to identify, develop, demonstrate, and implement a process(es) that will properly prepare the SNF and radioactive wastes stored at the ICPP for safe and efficient interim storage and final disposal.

1994-09-01T23:59:59.000Z

214

Development of a dedicated ethanol ultra-low emission vehicle (ULEV) -- Phase 2 report  

DOE Green Energy (OSTI)

The objective of this 3.5-year project is to develop a commercially competitive vehicle powered by ethanol (or an ethanol blend) that can meet California`s ultra-low emission vehicle (ULEV) standards and equivalent corporate average fuel economy (CAFE) energy efficiency for a light-duty passenger car application. The definition of commercially competitive is independent of fuel cost, but does include technical requirements for competitive power, performance, refueling times, vehicle range, driveability, fuel handling safety, and overall emissions performance. This report summarizes the second phase of this project, which lasted 12 months. This report documents two baseline vehicles, the engine modifications made to the original equipment manufacturer (OEM) engines, advanced aftertreatment testing, and various fuel tests to evaluate the flammability, lubricity, and material compatibility of the ethanol fuel blends.

Dodge, L.G.; Bourn, G.; Callahan, T.J.; Naegeli, D.W.; Shouse, K.R.; Smith, L.R.; Whitney, K.A. [Southwest Research Inst., San Antonio, TX (United States)

1995-09-01T23:59:59.000Z

215

Development of a dedicated ethanol ultra-low-emissions vehicle (ULEV): Phase 3 report  

DOE Green Energy (OSTI)

The objective of the 3.5 year project discussed in this report was to develop a commercially competitive vehicle powered by ethanol (or an ethanol blend) that can meet California`s Ultra Low Emissions Vehicle (ULEV) standards and equivalent Corporate Average Fuel Economy (CAFE) energy efficiency for a light duty passenger car application. This particular report summarizes the third phase of the project, which lasted 12 months. Emissions tests were conducted with advanced after-treatment devices on one of the two, almost identical, test vehicles, a 1993 Ford Taurus flexible fuel vehicle. The report also covers tests on the engine removed from the second Taurus vehicle. This engine was modified for an increased compression ratio, fitted with air assist injectors, and included an advanced engine control system with model-based control.

Dodge, L.; Callahan, T.; Leone, D.; Naegeli, D.; Shouse, K.; Smith, L.; Whitney, K. [Southwest Research Inst., San Antonio, TX (United States)] [Southwest Research Inst., San Antonio, TX (United States)

1998-04-01T23:59:59.000Z

216

Los Alamos Waste Management Cost Estimation Model; Final report: Documentation of waste management process, development of Cost Estimation Model, and model reference manual  

Science Conference Proceedings (OSTI)

This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs.

Matysiak, L.M.; Burns, M.L.

1994-03-01T23:59:59.000Z

217

Trends Affecting Building Control System Development: Trends in Energy Management Technology  

E-Print Network (OSTI)

technologies on energy management systems and products. Therelative to energy management systems design, specification,and Control System Energy Management System F E D E R A L E

Collins, Ted; Parker, Steven A.; Webster, Tom

2002-01-01T23:59:59.000Z

218

Center for Fuel Cell Research and Applications development phase. Final report  

DOE Green Energy (OSTI)

The deployment and operation of clean power generation is becoming critical as the energy and transportation sectors seek ways to comply with clean air standards and the national deregulation of the utility industry. However, for strategic business decisions, considerable analysis is required over the next few years to evaluate the appropriate application and value added from this emerging technology. To this end the Houston Advanced Research Center (HARC) is proposing a three-year industry-driven project that centers on the creation of ``The Center for Fuel Cell Research and Applications.`` A collaborative laboratory housed at and managed by HARC, the Center will enable a core group of six diverse participating companies--industry participants--to investigate the economic and operational feasibility of proton-exchange-membrane (PEM) fuel cells in a variety of applications (the core project). This document describes the unique benefits of a collaborative approach to PEM applied research, among them a shared laboratory concept leading to cost savings and shared risks as well as access to outstanding research talent and lab facilities. It also describes the benefits provided by implementing the project at HARC, with particular emphasis on HARC`s history of managing successful long-term research projects as well as its experience in dealing with industry consortia projects. The Center is also unique in that it will not duplicate the traditional university role of basic research or that of the fuel cell industry in developing commercial products. Instead, the Center will focus on applications, testing, and demonstration of fuel cell technology.

NONE

1998-12-01T23:59:59.000Z

219

Biomass power for rural development. Technical progress report Phase-II. Contractual reporting period October-December 1999  

DOE Green Energy (OSTI)

The project undertaken by the Salix Consortium is a multi-phased, multi-partner endeavor. Phase 1 focused on initial development and testing of the technology and forging the necessary agreements to demonstrate commercial willow production. The Phase 1 objectives have been successfully completed: preparing design plans for 2 utility pulverized coal boilers for 20 MW of biopower capacity; developing fuel supply plans for the project with a goal of establishing 365 ha (900 ac) of willow; obtaining power production commitments from the power companies for Phase 2; obtaining construction and environmental permits; and developing an experimental strategy for crop production and power generation improvements needed to assure commercial success. The R and D effort also addresses environmental issues pertaining to introduction of the willow energy system.

Neuhauser, Edward; The Salix Consortium

2000-03-23T23:59:59.000Z

220

Social impact management through planning and development : Hedonic Psychology and a new approach to tourism in Zanzibar  

E-Print Network (OSTI)

This study proposes a new approach to tourism planning and development based on three threads in the literature on social impact management: (1) the current approach to tourism studies; (2) the writings and activities of ...

Metzger, A. Tell (Adam Tell), 1974-

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Idaho Chemical Processing Plant Spent Fuel and Waste Management Technology Development Program Plan  

SciTech Connect

The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage and reprocessing since 1953. Reprocessing of SNF has resulted in an existing inventory of 1.5 million gallons of radioactive sodium-bearing liquid waste and 3800 cubic meters (m{sup 3}) of calcine, in addition to the 768 metric tons (MT) of SNF and various other fuel materials in inventory. To date, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, recent changes in world events have diminished the demand to recover and recycle this material. As a result, DOE has discontinued reprocessing SNF for uranium recovery, making the need to properly manage and dispose of these and future materials a high priority. In accordance with the Nuclear Waste Policy Act (NWPA) of 1982, as amended, disposal of SNF and high-level waste (HLW) is planned for a geological repository. Preparation of SNF, HLW, and other radioactive wastes for disposal may include mechanical, physical, and/or chemical processes. This plan outlines the program strategy of the ICPP Spent Fuel and Waste Management Technology Development Program (SF&WMTDP) to develop and demonstrate the technology required to ensure that SNF and radioactive waste will properly stored and prepared for final disposal. Program elements in support of acceptable interim storage and waste minimization include: developing and implementing improved radioactive waste treatment technologies; identifying and implementing enhanced decontamination and decommissioning techniques; developing radioactive scrap metal (RSM) recycle capabilities; and developing and implementing improved technologies for the interim storage of SNF.

1993-09-01T23:59:59.000Z

222

Metal hydride/chemical heat-pump development project. Phase I. Final report  

DOE Green Energy (OSTI)

The metal hydride/chemical heat pump (MHHP) is a chemical heat pump containing two hydrides for the storage and/or recovery of thermal energy. It utilizes the heat of reaction of hydrogen with specific metal alloys. The MHHP design can be tailored to provide heating and/or cooling or temperature upgrading over a wide range of input and ambient temperatures. The system can thus be used with a variety of heat sources including waste heat, solar energy or a fossil fuel. The conceptual design of the MHHP was developed. A national market survey including a study of applications and market sectors was conducted. The technical tasks including conceptual development, thermal and mechanical design, laboratory verification of design and material performance, cost analysis and the detailed design of the Engineering Development Test Unit (EDTU) were performed. As a result of the market study, the temperature upgrade cycle of the MHHP was chosen for development. Operating temperature ranges for the upgrader were selected to be from 70 to 110/sup 0/C (160 to 230/sup 0/F) for the source heat and 140 to 190/sup 0/C (280 to 375/sup 0/F) for the product heat. These ranges are applicable to many processes in industries such as food, textile, paper and pulp, and chemical. The hydride pair well suited for these temperatures is LaNi/sub 5//LaNi/sub 4/ /sub 5/Al/sub 0/ /sub 5/. The EDTU was designed for the upgrade cycle. It is a compact finned tube arrangement enclosed in a pressure vessel. This design incorporates high heat transfer and low thermal mass in a system which maximizes the coefficient of performance (COP). It will be constructed in Phase II. Continuation of this effort is recommended.

Argabright, T.A.

1982-02-01T23:59:59.000Z

223

Final Report: Development of a Thermal and Water Management System for PEM Fuel Cell  

DOE Green Energy (OSTI)

This final program report is prepared to provide the status of program activities performed over the period of 9 years to develop a thermal and water management (TWM) system for an 80-kW PEM fuel cell power system. The technical information and data collected during this period are presented in chronological order by each calendar year. Balance of plant (BOP) components of a PEM fuel cell automotive system represents a significant portion of total cost based on the 2008 study by TIAX LLC, Cambridge, MA. The objectives of this TWM program were two-fold. The first objective was to develop an advanced cooling system (efficient radiator) to meet the fuel cell cooling requirements. The heat generated by the fuel cell stack is a low-quality heat (small difference between fuel cell stack operating temperature and ambient air temperature) that needs to be dissipated to the ambient air. To minimize size, weight, and cost of the radiator, advanced fin configurations were evaluated. The second objective was to evaluate air humidification systems which can meet the fuel cell stack inlet air humidity requirements. The moisture from the fuel cell outlet air is transferred to inlet air, thus eliminating the need for an outside water source. Two types of humidification devices were down-selected: one based on membrane and the other based on rotating enthalpy wheel. The sub-scale units for both of these devices have been successfully tested by the suppliers. This project addresses System Thermal and Water Management.

Zia Mirza, Program Manager

2011-12-06T23:59:59.000Z

224

Scenario development for water resources planning and watershed management: Methodology and semi-arid region case study  

Science Conference Proceedings (OSTI)

Utilizing the scenario development framework from Mahmoud et al. (2009), a set of scenarios were developed for and applied in the Verde River Watershed in Arizona, USA. Through a scenario definition exercise, three dimensions of future change with respective ... Keywords: Scenario development, Scenario planning, Scenarios, Water resources management, Water resources planning

Mohammed I. Mahmoud; Hoshin V. Gupta; Seshadri Rajagopal

2011-07-01T23:59:59.000Z

225

Phase I of the Near-Term Hybrid Passenger-Vehicle Development Program. Final report  

DOE Green Energy (OSTI)

Heat engine/electric hybrid vehicles offer the potential of greatly reduced petroleum consumption, compared to conventional vehicles, without the disadvantages of limited performance and operating range associated with purely electric vehicles. This report documents a hybrid-vehicle design approach which is aimed at the development of the technology required to achieve this potential - in such a way that it is transferable to the auto industry in the near term. The development of this design approach constituted Phase I of the Near-Term Hybrid-Vehicle Program. The major tasks in this program were: (1) Mission Analysis and Performance Specification Studies; (2) Design Tradeoff Studies; and (3) Preliminary Design. Detailed reports covering each of these tasks are included as appendices to this report and issued under separate cover; a fourth task, Sensitivity Studies, is also included in the report on the Design Tradeoff Studies. Because of the detail with which these appendices cover methodology and both interim and final results, the body of this report was prepared as a brief executive summary of the program activities and results, with appropriate references to the detailed material in the appendices.

Not Available

1980-10-01T23:59:59.000Z

226

Development and proof-testing of advanced absorption refrigeration cycle concepts. Report on Phases 1 and 1A  

SciTech Connect

The overall objectives of this project are to evaluate, develop, and proof-test advanced absorption refrigeration cycles that are applicable to residential and commercial heat pumps for space conditioning. The heat pump system is to be direct-fired with natural gas and is to use absorption working fluids whose properties are known. Target coefficients of performance (COPs) are 1.6 at 47{degrees}F and 1.2 at 17{degrees} in the heating mode, and 0.7 at 95{degree}F in the cooling mode, including the effect of flue losses. The project is divided into three phases. Phase I entailed the analytical evaluation of advanced cycles and included the selection of preferred concepts for further development. Phase II involves the development and testing of critical components and of a complete laboratory breadboard version of the selected system. Phase III calls for the development of a prototype unit and is contingent on the successful completion of Phase II. This report covers Phase I work on the project. In Phase 1, 24 advanced absorption cycle/fluid combinations were evaluated, and computer models were developed to predict system performance. COP, theoretical pump power, and internal heat exchange were calculated for each system, and these calculations were used as indicators of operating and installed costs in order to rank the relative promise of each system. The highest ranking systems involve the cycle concept of absorber/generator heat exchange, generator heat exchanger/absorber heat exchange, regeneration, and resorption/desorption, in combination with the NH{sub 3}/H{sub 2}O/LiBr ternary absorption fluid mixture or with the NH{sub 3}/H{sub 2}O binary solution. Based upon these conclusions, the recommendation was made to proceed to Phase II, the laboratory breadboard proof-of- concept.

Modahl, R.J.; Hayes, F.C. [Trane Co., La Crosse, WI (United States). Applied Unitary/Refrigeration Systems Div.

1992-03-01T23:59:59.000Z

227

Liquid phase methanol LaPorte process development unit: Modification, operation, and support studies  

DOE Green Energy (OSTI)

Liquid-entrained operations at the LaPorte Liquid Phase Methanol (LPMEOH) Process Development Unit (PDU) continued during June and July 1988 under Tasks 2.1 and 2.2 of Contract No. DE-AC22-87PC90005 for the US Department of Energy. The primary focus of this PDU operating program was to prepare for a confident move to the next scale of operation with an optimized and simplified process. Several new design options had been identified and thoroughly evaluated in a detailed process engineering study completed under the LPMEOH Part-2 contract (DE-AC22-85PC80007), which then became the basis for the current PDU modification/operating program. The focus of the Process Engineering Design was to optimize and simplifications focused on the slurry loop, which consists of the reactor, vapor/liquid separator, slurry heat exchanger, and slurry circulation pump. Two-Phase Gas Holdup tests began at LaPorte in June 1988 with nitrogen/oil and CO- rich gas/oil systems. The purpose of these tests was to study the hydrodynamics of the reactor, detect metal carbonyl catalyst poisons, and train operating personnel. Any effect of the new gas sparger and the internal heat exchanger would be revealed by comparing the hydrodynamic data with previous PDU hydrodynamic data. The Equipment Evaluation'' Run E-5 was conducted at the LaPorte LPMEOH PDU in July 1988. The objective of Run E-5 was to systematically evaluate each new piece of equipment (sparger, internal heat exchanger, V/L disengagement zone, demister, and cyclone) which had been added to the system, and attempt to run the reactor in an internal-only mode. In addition, a successful catalyst activation with a concentrated (45 wt % oxide) slurry was sought. 9 refs., 26 figs., 15 tabs.

Not Available

1991-01-02T23:59:59.000Z

228

Development, Demonstration, and Field Testing of Enterprise-Wide Distributed Generation Energy Management System: Final Report  

DOE Green Energy (OSTI)

This report details progress on subcontract NAD-1-30605-1 between the National Renewable Energy Laboratory and RealEnergy (RE), the purpose of which is to describe RE's approach to the challenges it faces in the implementation of a nationwide fleet of clean cogeneration systems to serve contemporary energy markets. The Phase 2 report covers: utility tariff risk and its impact on market development; the effect on incentives on distributed energy markets; the regulatory effectiveness of interconnection in California; a survey of practical field interconnection issues; trend analysis for on-site generation; performance of dispatch systems; and information design hierarchy for combined heat and power.

Greenberg, S.; Cooley, C.

2005-01-01T23:59:59.000Z

229

Development of dual phase magnesia-zirconia ceramics for light water reactor inert matrix fuel  

E-Print Network (OSTI)

Dual phase magnesia-zirconia ceramics were developed, characterized, and evaluated as a potential matrix material for use in light water reactor inert matrix fuel intended for the disposition of plutonium and minor actinides. Ceramics were fabricated from the oxide mixture using conventional pressing and sintering techniques. Characterization of the final product was performed using optical microscopy, scanning electron microscopy, x-ray diffraction analysis, and energy-dispersive x-ray analysis. The final product was found to consist of two phases: cubic zirconia-based solid solution and cubic magnesia. Evaluation of key feasibility issues was limited to investigation of long-term stability in hydrothermal conditions and assessment of the thermal conductivity. With respect to hydrothermal stability, it was determined that limited degradation of these ceramics at 300^oC occurred due to the hydration of the magnesia phase. Normalized mass loss rate, used as a quantitative indicator of degradation, was found to decrease exponentially with the zirconia content in the ceramics. The normalized mass loss rates measured in static 300^oC de-ionized water for the magnesia-zirconia ceramics containing 40, 50, 60, and 70 weight percent of zirconia are 0.00688, 0.00256, 0.000595, 0.000131 g/cm2/hr respectively. Presence of boron in the water had a dramatic positive effect on the hydration resistance. At 300^oC the normalized mass loss rates for the composition containing 50 weight percent of zirconia was 0.00005667 g/cm2/hr in the 13000 ppm aqueous solution of the boric acid. With respect to thermal conductivity, the final product exhibits values of 5.5-9.5 W/(m deg) at 500^oC, and 4-6 W/(m deg) at 1200^oC depending on the composition. This claim is based on the assessment of thermal conductivity derived from thermal diffusivity measured by laser flash method in the temperature range from 200 to 1200^oC, measured density, and heat capacity calculated using rule of mixtures. Analytical estimates of the anticipated maximum temperature during normal reactor operation in a hypothetical inert matrix fuel rod based on the magnesia-zirconia ceramics yielded the values well below the melting temperature and well below current maximum temperatures authorized in light water reactors.

Medvedev, Pavel

2004-12-01T23:59:59.000Z

230

The demand-side management program development process: A utility perspective  

SciTech Connect

This report describes an aspect of DSM that has received little attention, namely, how utilities develop DSM programs. The selection of utilities to study purposely was biased in favor of those with reputations for being experienced DSM program developers so as to optimize the chances to obtain detailed information. The DSM planning process is affected by organizational factors and external influences: (1) the location of the demand-side planning department within the utility; (2) the demand-side planning group`s functional responsibilities; (3) upper management participation in the DSM program development process; and (4) the organizational relationship between (or, separation of) supply-side and demand-side planning. Organizational factors reflect utilities` views of DSM programs and thus can affect the adoption of a technology- or customer-oriented approach. Despite repeated claims of the uniqueness of the demand- side planning process and its resistance to standardization, two general approaches to program development were discerned, namely technology- or customer-orientation. Although utilities consider customer related and technological factors in their DSM program development process, utilities can be differentiated by their emphasis on one or the other approach. 25 refs.

Wolfe, A.K. [Oak Ridge National Lab., TN (United States); Yourstone, N.E. [Yourstone (Evelin), Albuquerque, NM (United States)

1992-03-01T23:59:59.000Z

231

The demand-side management program development process: A utility perspective  

Science Conference Proceedings (OSTI)

This report describes an aspect of DSM that has received little attention, namely, how utilities develop DSM programs. The selection of utilities to study purposely was biased in favor of those with reputations for being experienced DSM program developers so as to optimize the chances to obtain detailed information. The DSM planning process is affected by organizational factors and external influences: (1) the location of the demand-side planning department within the utility; (2) the demand-side planning group's functional responsibilities; (3) upper management participation in the DSM program development process; and (4) the organizational relationship between (or, separation of) supply-side and demand-side planning. Organizational factors reflect utilities' views of DSM programs and thus can affect the adoption of a technology- or customer-oriented approach. Despite repeated claims of the uniqueness of the demand- side planning process and its resistance to standardization, two general approaches to program development were discerned, namely technology- or customer-orientation. Although utilities consider customer related and technological factors in their DSM program development process, utilities can be differentiated by their emphasis on one or the other approach. 25 refs.

Wolfe, A.K. (Oak Ridge National Lab., TN (United States)); Yourstone, N.E. (Yourstone (Evelin), Albuquerque, NM (United States))

1992-03-01T23:59:59.000Z

232

Geothermal Development and Resource Management in the Yakima Valley : A Guidebook for Local Governments.  

DOE Green Energy (OSTI)

The guidebook defines the barriers to geothermal energy development at all levels of government and proposes ways to overcome these various barriers. In recognition that wholesale development of the region's geothermal resources could create a series of environmental problems and possible conflicts between groundwater users, resource management options are identified as possible ways to ensure the quality and quantity of the resource for future generations. It is important for local governments to get beyond the discussion of the merits of geothermal energy and take positive actions to develop or to encourage the development of the resource. To this end, several sources of technical and financial assistance are described. These sources of assistance can enable local governments and others to take action should they choose to do so. Even though the Yakima Valley is the setting for the analysis of local issues that could hamper geothermal development, this guidebook could be used by any locale with geothermal energy resources. The guidebook is not a scientific manual, but rather a policy document written especially for local government staff and officials who do not have technical backgrounds in geology or hydrology.

Creager, Kurt

1984-03-01T23:59:59.000Z

233

Development and implementation of information systems for the DOE's National Analytical Management Program (NAMP).  

SciTech Connect

The Department of Energy (DOE) faces a challenging environmental management effort, including environmental protection, environmental restoration, waste management, and decommissioning. This effort requires extensive sampling and analysis to determine the type and level of contamination and the appropriate technology for cleanup, and to verify compliance with environmental regulations. Data obtained from these sampling and analysis activities are used to support environmental management decisions. Confidence in the data is critical, having legal, regulatory, and therefore, economic impact. To promote quality in the planning, management, and performance of these sampling and analysis operations, DOE's Office of Environmental Management (EM) has established the National Analytical Management Program (NAMP). With a focus on reducing the estimated costs of over $200M per year for EM's analytical services, NAMP has been charged with developing products that will decrease the costs for DOE complex-wide environmental management while maintaining quality in all aspects of the analytical data generation. As part of this thrust to streamline operations, NAMP is developing centralized information systems that will allow DOE complex personnel to share information about EM contacts at the various sites, pertinent methodologies for environmental restoration and waste management, costs of analyses, and performance of contracted laboratories.

Streets, W. E.

1999-01-29T23:59:59.000Z

234

Development and Testing of a Groundwater Management Model for the Faultless Underground Nuclear Test, Central Nevada Test Area  

DOE Green Energy (OSTI)

This document describes the development and application of a user-friendly and efficient groundwater management model of the Central Nevada Test Area (CNTA) and surrounding areas that will allow the U.S. Department of Energy and state personnel to evaluate the impact of future proposed scenarios. The management model consists of a simple hydrologic model within an interactive groundwater management framework. This framework is based on an object user interface that was developed by the U.S. Geological Survey and has been used by the Desert Research Institute researchers and others to couple disparate environmental resource models, manage the necessary temporal and spatial data, and evaluate model results for management decision making. This framework was modified and applied to the CNTA and surrounding Hot Creek Valley. The utility of the management model was demonstrated through the application of hypothetical future scenarios including mineral mining, regional expansion of agriculture, geothermal energy production, and export of water to large urban areas outside the region. While the results from some of the scenarios indicated potential impacts to the region near CNTA and others did not, together they demonstrate the usefulness of the management tool for managers who need to evaluate the impact proposed changes in groundwater use in or near CNTA may have on radionuclide migration.

Douglas P. Boyle; Gregg Lamorey; Scott Bassett; Greg Pohll; Jenny Chapman

2006-01-25T23:59:59.000Z

235

Partition of actinides and fission products between metal and molten salt phases: Theory, measurement, and application to IFR pyroprocess development  

Science Conference Proceedings (OSTI)

The chemical basis of Integral Fast Reactor fuel reprocessing (pyroprocessing) is partition of fuel, cladding, and fission product elements between molten LiCl-KCl and either a solid metal phase or a liquid cadmium phase. The partition reactions are described herein, and the thermodynamic basis for predicting distributions of actinides and fission products in the pyroprocess is discussed. The critical role of metal-phase activity coefficients, especially those of rare earth and the transuranic elements, is described. Measured separation factors, which are analogous to equilibrium constants but which involve concentrations rather than activities, are presented. The uses of thermodynamic calculations in process development are described, as are computer codes developed for calculating material flows and phase compositions in pyroprocessing.

Ackerman, J.P.; Johnson, T.R.

1993-10-01T23:59:59.000Z

236

Nuclear Maintenance Application Center: Development and Analysis of an Open Phase Detection Scheme for Various Configurations of Auxiliary Transformers  

Science Conference Proceedings (OSTI)

Two recent failures have highlighted the need to detect open-phase conditions that can occur in the power delivery system. The analysis described in this report was performed to determine the response of system auxiliary transformers during open-phase conditions to aid in the development of system protection schemes to detect such conditions.BackgroundIn January 2012, an auxiliary component tripped due to a bus under-voltage. The cause of the event was the ...

2013-05-10T23:59:59.000Z

237

Municipal solid waste management challenges in developing countries - Kenyan case study  

Science Conference Proceedings (OSTI)

This paper provides an overview of the state of municipal solid waste management (MSWM) by local authorities in Kenya as a case study of a low-income developing country. Approaches of possible solutions that can be undertaken to improve municipal solid waste (MSW) services are discussed. Poor economic growth (1.1% in 1993) has resulted in an increase in the poverty level which presently stands at 56%. Migration from the rural areas to the urban areas has resulted in unplanned settlements in suburban areas accommodating about 60% of the urban population on only 5% urban land area. Political interference also hampers smooth running of local authorities. Vulnerability of pollution of surface and groundwater is high because local authorities rarely considered environmental impact in siting MSW disposal sites. Illegal dumping of MSW on the river banks or on the roadside poses environmental and economic threats on nearby properties. Poor servicing of MSW collection vehicles, poor state of infrastructure and the lack of adequate funding militate against optimization of MSW disposal service. The rural economy needs to be improved if rural-urban migration is to be managed. Involvement of stakeholders is important to achieve any meaningful and sustainable MSWM. The role of the informal sector through community-based organizations (CBOs), Non-Governmental Organizations (NGOs) and the private sector in offering solutions towards improvement of MSWM also is explored.

Henry, Rotich K. [College of Environment and Resources, Jilin University, Changchun 130026 (China); Zhao Yongsheng [College of Environment and Resources, Jilin University, Changchun 130026 (China)]. E-mail: zhaoyongsheng@jlu.edu.cn; Dong Jun [College of Environment and Resources, Jilin University, Changchun 130026 (China)

2006-07-01T23:59:59.000Z

238

Liquid phase fluid dynamic (methanol) run in the LaPorte alternative fuels development unit  

DOE Green Energy (OSTI)

A fluid dynamic study was successfully completed in a bubble column at DOE's Alternative Fuels Development Unit (AFDU) in LaPorte, Texas. Significant fluid dynamic information was gathered at pilot scale during three weeks of Liquid Phase Methanol (LPMEOJP) operations in June 1995. In addition to the usual nuclear density and temperature measurements, unique differential pressure data were collected using Sandia's high-speed data acquisition system to gain insight on flow regime characteristics and bubble size distribution. Statistical analysis of the fluctuations in the pressure data suggests that the column was being operated in the churn turbulent regime at most of the velocities considered. Dynamic gas disengagement experiments showed a different behavior than seen in low-pressure, cold-flow work. Operation with a superficial gas velocity of 1.2 ft/sec was achieved during this run, with stable fluid dynamics and catalyst performance. Improvements included for catalyst activation in the design of the Clean Coal III LPMEOH{trademark} plant at Kingsport, Tennessee, were also confirmed. In addition, an alternate catalyst was demonstrated for LPMEOH{trademark}.

Bharat L. Bhatt

1997-05-01T23:59:59.000Z

239

Structural Composites Industries 4 kilowatt wind system development. Phase I: design and analysis, technical report  

DOE Green Energy (OSTI)

A 4 kW small wind energy conversion system (SWECS) has been designed for residential applications in which relatively low (10 mph) mean annual wind speeds prevail. The objectives were to develop such a machine to produce electrical energy at 6 cents per kWh while operating in parallel with a utility grid or auxiliary generator. The Phase I effort began in November, 1979 and was carried through the Final Design Review in February 1981. During this period extensive trade, optimization and analytical studies were performed in an effort to provide the optimum machine to best meet the objectives. Certain components, systems and manufacturing processes were tested and evaluated and detail design drawings were produced. The resulting design is a 31-foot diameter horizontal axis downwind machine rated 5.7 kW and incorporating the following unique features: Composite Blades; Free-Standing Composite Tower; Torque-Actuated Blade Pitch Control. The design meets or exceeds all contract requirements except that for cost of energy. The target 6 cents per kWh will be achieved in a mean wind speed slightly below 12 mph instead of the specified 10 mph.

Malkine, N.; Bottrell, G.; Weingart, O.

1981-05-01T23:59:59.000Z

240

Development of ammoniated salts. Thermochemical energy storage systems: Phase IB. Final report, February--September 1977  

DOE Green Energy (OSTI)

Thermal energy is usually stored in energy storage systems as sensible heat at temperatures well above the ambient temperature. Most energy storage systems of this type suffer from two drawbacks: (1) the thermal losses to the surroundings are large, and (2) the energy is only available for recovery at the bulk temperature of the storage material; therefore, the stored energy can only be partially recovered. If the energy could be stored at near ambient temperature and recovered at the desired use temperature, thermal losses can be minimized and a high degree of efficiency can be maintained. The purpose of the program is to develop an energy storage system that accepts thermal energy at high temperatures, stores that energy at ambient temperature, and recovers the energy at the original high temperature. The energy is stored as chemical energy. The concept consists of storage and subsequent extraction of the heat of reaction from a pair of ammoniated salts near equilibrium conditions. By shifting the equilibrium in the forward or reverse direction, the heat of reaction can be stored or recovered. The system can be used for many different applications (i.e., different temperature levels) by selecting the appropriate salt pair for the high and low temperature reactions. In this phase of the program, the technical feasibility of the concept was demonstrated using several ammoniated salt pairs.

Jaeger, F. A.; Howerton, M. T.; Podlaseck, S. E.; Myers, J. E.; Beshore, D. G.; Haas, W. R.

1978-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Grid-connected integrated community energy system. Phase II, Stage 1, final report. Conceptual design: pyrolysis and waste management systems  

DOE Green Energy (OSTI)

The University of Minnesota is studying and planning a grid-connected integrated community energy system to include disposal of wastes from health centers and utilizing the heat generated. Following initial definition of the 7-county metropolitan region for which the solid waste management system is to be planned, information is then necessary about the nature of the waste generated within this region. Estimates of the quantities generated, generation rates, and properties of the waste to be collected and disposed of are required in order to determine the appropriate size and capacity of the system. These estimates are designated and subsequently referred to as ''system input''. Institutional information is also necessary in designing the planned system, to be compatible with existing institutional operations and procedures, or to offer a minimum amount of problems to the participating institution in the region. Initial considerations of health care institutions generating solid waste within the defined region are made on a comprehensive basis without any attempt to select out or include feasible candidate institutions, or institutional categories. As the study progresses, various criteria are used in selecting potential candidate institutional categories and institutions within the 7-county region as offering the most feasible solid waste system input to be successfully developed into a centralized program; however, it is hoped that such a system if developed could be maintained for the entire 7-county region, and remain comprehensive to the entire health care industry. (MCW)

Not Available

1978-03-08T23:59:59.000Z

242

Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 2, Technical report  

SciTech Connect

This is the second volume of the Phase 1 report and discusses the 10 tasks performed in Phase 1. The objective of this research is to develop a methodology for setting energy design targets to provide voluntary guidelines for the buildings industry. The whole-building energy targets project is being conducted at the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) to encourage the construction of energy-efficient buildings by informing designers and owners about cost-effective goals for energy use in new commercial buildings. The outcome of this research will be a flexible methodology for setting such targets. The tasks are listed and discussed in this report as follows: Task 1 - Develop Detailed Project Goals and Objectives; Task 2 - Establish Buildings-Industry Liaison; Task 3 - Develop Approaches to the Energy Targets Model, Building Operations, and Climate; Task 4 - Develop an Approach for Treating Economic Considerations; Task 5 - Develop an Approach for Treating Energy Sources; Task 6 - Collect Energy-Use Data; Task 7 - Survey Energy Expert Opinion; Task 8 - Evaluation Procedure Specification and Integration; Task 9 - Phase 1 Report Development; and Task 10 - Phase 1 Review Planning.

Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

1987-08-01T23:59:59.000Z

243

Technologies development for environmental restoration and waste management: International university and research institution and industry partnerships  

SciTech Connect

The Institute for Central and Eastern European Cooperative Environmental Research (ICEECER) at Florida State University was formed in 1990 soon after the end of the Cold War. ICEECER consists of a number of joint centers which link FSU, and US as well as international funding agencies, to academic and research institutions in Hungary, Poland, the Czech Republic, Russia, and the other countries of Central and Eastern Europe and the Newly Independent States. Areas of interest include risk assessment, toxicology, contaminated site remediation/characterization, waste management, emergency response, environmental technology development/demonstration/transfer, and some specialized areas of research (e.g., advanced chemical separations). Through ICEECER, numerous international conferences, symposia, training courses, and workshops have also been conducted on a variety of environmental topics. This paper summarizes the mission, structure, and administration of ICEECER and provides information on the projects conducted through this program at FSU.

Herndon, R.C.; Moerlins, J.E.; Kuperberg, J.M.

1996-12-31T23:59:59.000Z

244

Spent Fuel and Waste Management Technology Development Program. Annual progress report  

SciTech Connect

This report provides information on the progress of activities during fiscal year 1993 in the Spent Fuel and Waste Management Technology Development Program (SF&WMTDP) at the Idaho Chemical Processing Plant (ICPP). As a new program, efforts are just getting underway toward addressing major issues related to the fuel and waste stored at the ICPP. The SF&WMTDP has the following principal objectives: Investigate direct dispositioning of spent fuel, striving for one acceptable waste form; determine the best treatment process(es) for liquid and calcine wastes to minimize the volume of high level radioactive waste (HLW) and low level waste (LLW); demonstrate the integrated operability and maintainability of selected treatment and immobilization processes; and assure that implementation of the selected waste treatment process is environmentally acceptable, ensures public and worker safety, and is economically feasible.

Bryant, J.W.

1994-01-01T23:59:59.000Z

245

Sperry Low Temperature Geothermal Conversion System, Phase I and Phase II. Volume V. Component development. Final report  

DOE Green Energy (OSTI)

The fundamental inventions which motivate this program are system concepts centered on a novel heat engine cycle and the use of downwell heat exchange. Here, the primary emphasis is on downwell hardware. The only surface equipment included is the surface portion of the instrumentation and control systems. Downwell instrumentation is reported. Downwell conduits and techniques for installing, connecting and sealing them are covered. The downwell turbine-pump unit (TPU) is a critical component since it is relatively inaccessible and operates in a hostile environment. Its development is reported. The TPU for the gravity-head system requires a different type of turbine because of the large flow-rate through it and the small pressure difference across it. The design study for a Francis turbine to meet these requirements is reported. A feature of these systems is use of a downwell heat exchanger. There were extensive studies of tube-bundle configuration, tube-sheet seals, structural integrity, and flow and heat transfer, as well as the research on welded connections and sliding elastomeric seals. Another innovative component in these systems is the enthalpy recovery unit (ERU). This direct-contact heat exchanger compensates for under-cooling in the condenser and superheat in the main turbine exhaust.

Harvey, C.; McBee, W.; Matthews, H.B.

1984-01-01T23:59:59.000Z

246

Bayesian Belief Network (BBN)-based advisory system development for steam generator replacement project management  

E-Print Network (OSTI)

The growing need for improved project management technique points to the usefulness of a knowledge-base advisory system to help project managers understand current and future project status and optimize decisions based ...

Kim, Dohyoung, 1970-

2002-01-01T23:59:59.000Z

247

Verification of the Effectiveness of VSOP-2 Phase Referencing with a Newly Developed Simulation Tool, ARIS  

E-Print Network (OSTI)

The next-generation space VLBI mission, VSOP-2, is expected to provide unprecedented spatial resolutions at 8.4, 22, and 43GHz. In this report, phase referencing with VSOP-2 is examined in detail based on a simulation tool called ARIS. The criterion for successful phase referencing was to keep the phase errors below one radian. Simulations with ARIS reveal that phase referencing achieves good performance at 8.4GHz, even under poor tropospheric conditions. At 22 and 43GHz, it is recommended to conduct phase referencing observations under good or typical tropospheric conditions. The satellite is required to have an attitude-switching capability with a one-minute or shorter cycle, and an orbit determination accuracy higher than about 10cm at apogee; the phase referencing calibrators are required to have a signal-to-noise ratio larger than four for a single scan. The probability to find a suitable phase referencing calibrator was estimated by using VLBI surveys. From the viewpoint of calibrator availability, VSOP-2 phase referencing at 8.4GHz is promising. However, the change of finding suitable calibrators at 22 and 43GHz is significantly reduced; it is important to conduct specific investigations for each target at those frequencies.

Yoshiharu Asaki; Hiroshi Sudou; Yusuke Kono; Akihiro Doi; Richard Dodson; Nicolas Pradel; Yasuhiro Murata; Nanako Mochizuki; Philip G. Edwards; Tetsuo Sasao; Edward B. Fomalont

2007-07-04T23:59:59.000Z

248

Development of expert system modeling based decision support system for swine manure management  

Science Conference Proceedings (OSTI)

Animal waste has always been considered as a resource for agricultural input as biofertilizer. However, the management is becoming more stringent due to environmental regulations. Livestock producers are faced with different manure management options ... Keywords: Decision criteria, Decision support system (DSS), Expert system, Manure management, Systems engineering approach

S. Karmakar; M. NKetia; C. Laguë; J. Agnew

2010-04-01T23:59:59.000Z

249

Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project LR O'Neil TJ Vanderhorst, Jr MJ Assante J Januszewski, III DH Tobey R Leo TJ Conway K Perman August 2013 PNNL- 22653 Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project LR O'Neil TJ Vanderhorst, Jr MJ Assante J Januszewski, III DH Tobey R Leo TJ Conway K Perman Contributors: SGC Panel Members August 2013 Prepared by: Pacific Northwest National Laboratory and

250

MUSHROOM WASTE MANAGEMENT PROJECT LIQUID WASTE MANAGEMENT  

E-Print Network (OSTI)

#12;MUSHROOM WASTE MANAGEMENT PROJECT LIQUID WASTE MANAGEMENT PHASE I: AUDIT OF CURRENT PRACTICE The Mushroom Waste Management Project (MWMP) was initiated by Environment Canada, the BC Ministry of solid and liquid wastes generated at mushroom producing facilities. Environmental guidelines

251

Phase I of the Near Term Hybrid Passenger Vehicle Development Program. Final report  

DOE Green Energy (OSTI)

The results of Phase I of the Near-Term Hybrid Vehicle Program are summarized. This phase of the program ws a study leading to the preliminary design of a 5-passenger hybrid vehicle utilizing two energy sources (electricity and gasoline/diesel fuel) to minimize petroleum usage on a fleet basis. This report presents the following: overall summary of the Phase I activity; summary of the individual tasks; summary of the hybrid vehicle design; summary of the alternative design options; summary of the computer simulations; summary of the economic analysis; summary of the maintenance and reliability considerations; summary of the design for crash safety; and bibliography.

Not Available

1980-10-01T23:59:59.000Z

252

Technology development program for Idaho Chemical Processing Plant spent fuel and waste management  

SciTech Connect

Irradiated nuclear fuel has been reprocessed at the Idaho Chemical Processing Plant (ICPP) since 1953 to recover uranium-235 and krypton-85 for the US Department of Energy (DOE). The resulting acidic high-level liquid radioactive waste (HLLW) has been solidified to a high-level waste (HLW) calcine since 1963 and stored in stainless-steel bins enclosed in concrete vaults. Residual HLW and radioactive sodium-bearing waste are stored in stainless-steel underground tanks contained in concrete vaults. Several different types of unprocessed irradiated DOE-owned fuels are also stored at INEL. In April, 1992, DOE announced that spent fuel would no longer be reprocessed to recover enriched uranium. As a result of the decision to curtail reprocessing the ICPP Spent Fuel and Waste Management Technology Development plan has been implemented to identify acceptable options for disposing of the (1) sodium-bearing liquid radioactive waste, (2) radioactive calcine, and (3) irradiated spent fuel stored at the INEL. The plan was developed jointly by DOE and Westinghouse Idaho Nuclear Company, Inc., (WINCO) and with the concurrence of the State of Idaho.

Ermold, L.F.; Knecht, D.A.; Hogg, G.W.; Olson, A.L.

1993-06-01T23:59:59.000Z

253

Identification of research and development needs in highway construction engineering and management  

E-Print Network (OSTI)

Ten years have passed since the last assessment of research and development needs in highway construction engineering and management (CEM) and a new research program is necessary to indicate the direction and focus of future research. This study identified the critical issues in need of future research and development. The research program indicated topics in which future research will reduce the cost and increase the efficiency of CEM of transportation projects. Assessment and prioritization of research needs were conducted through a preliminary survey and the Delphi process. The Delphi process consisted of a series of three questionnaires called rounds. The first and second rounds surveyed highway industry professionals to rank and identify issues. The third round was employed to clarify specific problem areas, barriers to implementation, and gaps in knowledge. A comprehensive literature search was conducted, with aid from the third-round survey results, to investigate past research conducted on the most critical highway CEM issues identified by the Delphi respondents. Information that was gathered during the literature search was used to compose draft research problem statements and objectives for future research projects. The draft research problem statements were presented at a research panel meeting to validate the issues and objectives. Alterations were made to the issue statements from the recommended changes by the research panel. The revised research problem statements are the final products of this thesis project.

Damron, Andrew James

2001-01-01T23:59:59.000Z

254

First Results of Experimental Tests of the Newly Developed NARL Phased-Array Doppler Sodar  

Science Conference Proceedings (OSTI)

A multifrequency phased-array Doppler sodar system has been installed recently at the National Atmospheric Research Laboratory (NARL) for the continuous observation of the lower atmosphere from near ground to the atmospheric boundary layer (ABL). ...

V. K. Anandan; M. Shravan Kumar; I. Srinivasa Rao

2008-10-01T23:59:59.000Z

255

Functional groups show distinct differences in nitrogen cycling during early stand development: implications for forest management.  

SciTech Connect

Nutrient acquisition of forest stands is controlled by soil resource availability and belowground production, but tree species are rarely compared in this regard. Here, we examine ecological and management implications of nitrogen (N) dynamics during early forest stand development in productive commercial tree species with narrow (Populus deltoides Bartr. and Platanus occidentalis L.) and broad (Liquidambar styraciflua L. and Pinus taeda L.) site requirements while grown with a range of nutrient and water resources. We constructed N budgets by measuring N concentration ([N]) and N content (N{sub C}) of above- and belowground perennial and ephemeral tissues, determined N uptake (N{sub UP}), and calculated N use efficiency (NUE). Forest stands regulated [N] within species-specific operating ranges without clear temporal or treatment patterns, thus demonstrating equilibrium between tissue [N] and biomass accumulation. Forest stand N{sub C} and N{sub UP} increased with stand development and paralleled treatment patterns of biomass accumulation, suggesting productivity is tightly linked to N{sub UP}. Inclusion of above- and belowground ephemeral tissue turnover in N{sub UP} calculations demonstrated that maximum N demand for narrow-sites adapted species exceeded 200 kg N ha{sup -1} year{sup -1} while demand for broad-site adapted species was below this level. NUE was species dependent but not consistently influenced by N availability, suggesting relationships between NUE and resource availability were species dependent. Based on early stand development, species with broad site adaptability are favored for woody cropping systems because they maintain high above- and belowground productivity with minimal fertilization requirements due to higher NUE than narrow site adapted species.

Aubrey, Doug, P.; Coyle, David, R. Coleman, Mark, D.

2011-08-26T23:59:59.000Z

256

PROPOSAL FOR THE PHASED DEVELOPMENT OF A CENTER FOR SUSTAINABILITY AT THE UNIVERSITY OF KANSAS  

E-Print Network (OSTI)

energy use to waste management, including both the built and natural environment. Sustainability also would help establish guidelines for responsible growth, reduce campus energy and resource consumption, and staff, and provided input to Chevron Energy Solutions regarding their campus energy education campaign

Peterson, Blake R.

257

Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment  

Science Conference Proceedings (OSTI)

DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

Not Available

1994-04-01T23:59:59.000Z

258

Development of an energy management solution for mine compressor systems / Johan Nicolaas du Plessis.  

E-Print Network (OSTI)

??Eskom is under increasing pressure to provide reliable and sustainable electricity. Demand Side Management (DSM), offers a short– to medium–term solution to this problem. During… (more)

Du Plessis, Johan Nicolaas

2010-01-01T23:59:59.000Z

259

The development of coal-based technologies for Department of Defense facilities: Phase 1 final report. Volume 1: Technical report  

SciTech Connect

The first phase of a three-phase project investigating the development of coal-based technologies for Department of Defense facilities has been completed. The objectives of the project are to: decrease DOD`s dependence on foreign oil and increase its use of coal; promote public and private sector deployment of technologies for utilizing coal-based fuels in oil-designed combustion equipment; and provide a continuing environment for research and development of coal-based fuel technologies for small-scale applications at a time when market conditions in the US are not favorable for the introduction of coal-fired equipment in the commercial and industrial capacity ranges. The Phase 1 activities were focused on developing clean, coal-based combustion technologies for the utilization of both micronized coal-water mixtures (MCWMs) and dry, micronized coal (DMC) in fuel oil-designed industrial boilers. The specific objective in Phase 1 was to deliver fully engineered retrofit options for a fuel oil-designed watertube boiler located on a DOD installation to fire either MCWM or DMC. This was achieved through a project consisting of fundamental, pilot-sale, and demonstration-scale activities investigating coal beneficiation and preparation, and MCWM and DMC combustion performance. In addition, detailed engineering designs and an economic analysis were conducted for a boiler located at the Naval Surface Warfare Center, near Crane, Indiana. Results are reported on MCWM and DMC combustion performance evaluation; engineering design; and cost/economic analysis.

Miller, B.G.; Morrison, J.L.; Pisupati, S.V. [Pennsylvania State Univ., University Park, PA (United States). Energy and Fuels Research Center] [and others

1997-01-31T23:59:59.000Z

260

Development and proof-testing of advanced absorption refrigeration cycle concepts, Phase 2  

SciTech Connect

This paper summarizes the results of the work performed to date under Phase II of the DOE program. The Phase II objective is to design, fabricate, and proof-test a natural gas-fired absorption heat pump (AHP) with an efficiency level substantially higher than present day state-of-the-art equipment. To achieve these objectives, Carrier investigated the performance of the candidate Phase I fluids (lithium bromide:zinc bromide/methyl alcohol-MEOH or lithium bromide:water methylmine-MMA) as well as high concentration formulations of the conventional LiBr/H2O mixture for high temperature, upper loop use. These results were compared with several existing fluid candidates including ammonia/water. 9 figs.

Reimann, R.C.; Melikian, G.

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. U.S. Steel teamed up with Calderon for a joint effort which will last 30 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy.

Albert Calderon

2003-01-28T23:59:59.000Z

262

Phase II Calderon Process to Produce Direct Reduced Iron Research and Development Project  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy.

Albert Calderon

2003-06-30T23:59:59.000Z

263

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

SciTech Connect

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. U.S. Steel teamed up with Calderon for a joint effort which will last 30 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy.

Albert Calderon

2003-04-28T23:59:59.000Z

264

Electricity pricing as a demand-side management strategy: Western lessons for developing countries  

Science Conference Proceedings (OSTI)

Electric utilities in the Western world have increasingly realized that load commitments can be met not only by constructing new generating plants but also by influencing electricity demand. This demand-side management (DSM) process requires that electric utilities promote measures on the customer's side of the meter to directly or indirectly influence electricity consumption to meet desired load objectives. An important demand-side option to achieve these load objectives is innovative electricity pricing, both by itself and as a financial incentive for other demand-site measures. This study explores electricity pricing as a DSM strategy, addressing four questions in the process: What is the Western experience with DSM in general and electricity pricing in particular Do innovative pricing strategies alter the amount and pattern of electricity consumption Do the benefits of these pricing strategies outweigh the costs of implementation What are future directions in electricity pricing Although DSM can be used to promote increases in electricity consumption for electric utilities with excess capacity as well as to slow demand growth for capacity-short utilities, emphasis here is placed on the latter. The discussion should be especially useful for electric utilities in developing countries that are exploring alternatives to capacity expansion to meet current and future electric power demand.

Hill, L.J.

1990-12-01T23:59:59.000Z

265

Artificial heart development program. Volume I. System development. Phase III summary report, July 1, 1973--September 30, 1977  

SciTech Connect

Efforts and results in the development of the power system portions of a calf implantable model of nuclear-powered artificial heart are discussed. The primary objective in developing the implantable model was to solve the packaging problems for total system implantation. The power system's portion is physically that portion of the implantable model between the /sup 238/Pu heat sources and the blood pump ventricles. The /sup 238/Pu heat sources and blood pump ventricles were provided as Government Furnished Equipment as developed and fabricated by other contractors.

1977-01-01T23:59:59.000Z

266

Development of models for the sodium version of the two-phase three-dimensional thermal hydraulics code THERMIT. [LMFBR  

SciTech Connect

Several different models and correlations were developed and incorporated in the sodium version of THERMIT, a thermal-hydraulics code written at MIT for the purpose of analyzing transients under LMFBR conditions. This includes: a mechanism for the inclusion of radial heat conduction in the sodium coolant as well as radial heat loss to the structure surrounding the test section. The fuel rod conduction scheme was modified to allow for more flexibility in modelling the gas plenum regions and fuel restructuring. The formulas for mass and momentum exchange between the liquid and vapor phases were improved. The single phase and two phase friction factors were replaced by correlations more appropriate to LMFBR assembly geometry.

Wilson, G.J.; Kazimi, M.S.

1980-05-01T23:59:59.000Z

267

Original paper: Development of an integrated Cropland and Soil Data Management system for cropping system applications  

Science Conference Proceedings (OSTI)

Most cropping system models and decision support tools are structured for site-specific (i.e. field- or point-based) simulation and analysis. As the need grows for analyses on crop production and management at local, county, state, national, and even ... Keywords: Cropland Data Layer, Cropping system, Database management system, Geographic Information System (GIS), Map service, SSURGO, Soil data

Yubin Yang; Lloyd Ted Wilson; Jing Wang; Xiaobao Li

2011-03-01T23:59:59.000Z

268

Development of a direct-injected natural gas engine system for heavy-duty vehicles: Final report phase 2  

DOE Green Energy (OSTI)

This report summarizes the results of Phase 2 of this contract. The authors completed four tasks under this phase of the subcontract. (1) They developed a computational fluid dynamics (CFD) model of a 3500 direct injected natural gas (DING) engine gas injection/combustion system and used it to identify DING ignition/combustion system improvements. The results were a 20% improvement in efficiency compared to Phase 1 testing. (2) The authors designed and procured the components for a 3126 DING engine (300 hp) and finished assembling it. During preliminary testing, the engine ran successfully at low loads for approximately 2 hours before injector tip and check failures terminated the test. The problems are solvable; however, this phase of the program was terminated. (3) They developed a Decision & Risk Analysis model to compare DING engine technology with various other engine technologies in a number of commercial applications. The model shows the most likely commercial applications for DING technology and can also be used to identify the sensitivity of variables that impact commercial viability. (4) MVE, Inc., completed a preliminary design concept study that examines the major design issues involved in making a reliable and durable 3,000 psi LNG pump. A primary concern is the life of pump seals and piston rings. Plans for the next phase of this program (Phase 3) have been put on indefinite hold. Caterpillar has decided not to fund further DING work at this time due to limited current market potential for the DING engine. However, based on results from this program, the authors believe that DI natural gas technology is viable for allowing a natural gas-fueled engine to achieve diesel power density and thermal efficiency for both the near and long terms.

Cox, G.B.; DelVecchio, K.A.; Hays, W.J.; Hiltner, J.D.; Nagaraj, R.; Emmer, C.

2000-03-02T23:59:59.000Z

269

Plant Support Engineering: Aging Management Program Development Guidance for Instrument and Control Cable Systems for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This document provides guidance for developing and implementing a cable aging management program for low-voltage instrument and control cable circuits in nuclear power plants. Guidance is provided for identifying cables located in adverse localized environments and determining if those environments have caused significant cable circuit degradation.

2010-11-29T23:59:59.000Z

270

Development of an interval-valued fuzzy linear-programming method based on infinite ?-cuts for water resources management  

Science Conference Proceedings (OSTI)

An interval-valued fuzzy linear-programming (IVFL) method based on infinite @a-cuts is developed for water resources management in this study. The introduction of interval parameters and interval-valued fuzzy parameters into the objective function and ... Keywords: Agricultural irrigation, Fuzzy linear-programming, Infinite ?-cuts, Interval, Uncertainty, Water resources

H. W. Lu; G. H. Huang; L. He

2010-03-01T23:59:59.000Z

271

Plains CO2 Reduction Partnership--Development Phase - Large Scale Field Tests  

NLE Websites -- All DOE Office Websites (Extended Search)

626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236 412-386-4867 sean.plasynski@netl.doe.gov Andrea McNemar Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-2024 andrea.mcnemar@netl.doe.gov Edward N. Steadman Technical Contact Energy & Environmental Research Center University of North Dakota 15 North 23rd Street, Stop 9018

272

Configuration Management Assessment Plan - Developed By NNSA/Nevada Site Office Independent Oversight Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Management Configuration Management Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders. Criteria: The CM program supports DOE program implementation through the following: It provides the mechanisms for identifying, cataloging, and maintaining the design requirements and design basis (established to satisfy DOE O 420.1 Facility Safety).

273

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

Albert Calderon

2005-01-25T23:59:59.000Z

274

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets, briquettes, sinter and coke.

Albert Calderon

2006-04-19T23:59:59.000Z

275

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

SciTech Connect

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets, briquettes, sinter and coke.

Albert Calderon

2006-01-30T23:59:59.000Z

276

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

SciTech Connect

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

Albert Calderon; Reina Calderon

2004-01-27T23:59:59.000Z

277

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

SciTech Connect

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

Albert Calderon

2004-07-28T23:59:59.000Z

278

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

Albert Calderon

2005-07-29T23:59:59.000Z

279

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

Albert Calderon

2004-04-27T23:59:59.000Z

280

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

Albert Calderon

2004-10-28T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

Albert Calderon

2005-01-26T23:59:59.000Z

282

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

SciTech Connect

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

Albert Calderon

2003-10-22T23:59:59.000Z

283

Phase II Calderon Process to Produce Direct Reduced Iron Research and Development Project  

Science Conference Proceedings (OSTI)

This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase 1 was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets, briquettes, sinter and coke.

Albert Calderon

2007-03-31T23:59:59.000Z

284

Development of asphalts and pavements using recycled tire rubber. Phase 1: technical feasibility. Final report  

Science Conference Proceedings (OSTI)

This report documents the technical progress made on the development of asphalts and pavements using recycled tire rubber.

Bullin, J.A.; Davison, R.R.; Glover, C.J. [and others

1998-01-01T23:59:59.000Z

285

Enertech 15-kW wind-system development. Phase II. Fabrication and test  

DOE Green Energy (OSTI)

This Phase II report presents a description of the Enertech 15 kW prototype wind system hardware fabrication; results of component tests; and results of preliminary testing conducted at Norwich, VT and the RF Wind Energy Research Center. In addition, the assembly sequence is documented. During testing, the unit experienced several operational problems, but testing proved the design concept and demonstrated the system's ability to meet the contract design specifications for power output.

Zickefoose, C.R.

1982-12-01T23:59:59.000Z

286

Grid connected integrated community energy system. Phase II: final state 2 report. Preliminary design waste management and institutional analysis  

SciTech Connect

The Preliminary Design of a Regional, Centralized Solid Waste Management System for the Twin Cities Metropolitan Region in Minnesota is presented. The concept has been developed for the sound environmental and safe disposal of solid waste generated from its health care industry, although some additional waste supplements are included as economic assistance in order to approach a competitive alternative to current health care solid waste disposal costs. The system design focuses on a 132 tons per day high-temperature, slagging pyrolysis system manufactured by Andco Incorporated, Andco-Torrax Division Design criteria are given. A Collection and Transportation System (CTS) has been planned for the movements of solid waste (General and Special) from the generating HHC facilities within a 10-mile waste-shed zone, for municipal solid waste from a local transfer station currently processing municipal solid waste, and for pyrolysis residue to final disposal. Each of these facilities is now considered as service contract operations. Approximately 15 vehicle trips per day are estimated as vehicle traffic delivering the refuse to the pyrolysis facility. Cost estimates for the CTS have been determined in conjunction with current municipal refuse haulers in the TCMR, and valued at the following: HHC General Solid Waste (HHC/GSW) at 6.00 $/T; HHC Special Solid Waste (HHC/SSW) at 20.00 $/T; Municipal Transfer at 4.00 to be paid the pyrolysis system as a drop charge. Special box-bag containers are to be required in handling the HHC/SSW at a cost of 30.19 $/T estimate. The total operating cost for the pyrolysis system has been estimated to be 13.73 $/T, with a steam credit of 11.70 $/T, to yield a net cost of 2.03 $/T. Capital cost has been estimated to be 7,700,800 dollars, 1978. A back-up facility capital investment of $163,000 dollars, 1978 has been estimated, which should be applied to the existing University of Minnesota incinerator.

1978-03-22T23:59:59.000Z

287

Forest fire management in Portugal : developing system insights through models of social and physical dynamics  

E-Print Network (OSTI)

Managing forest fires is a serious national problem in Portugal. Burned area has increased steadily over the past several decades, with particularly devastating years in 2003 and 2005. Ignitions also spike dramatically in ...

Collins, Ross D. (Ross Daniel)

2012-01-01T23:59:59.000Z

288

Managing and Valuing a Corporate IT Portfolio Using Dynamic Modeling of Software Development and Maintenance Processes  

E-Print Network (OSTI)

The goal of this research is to enable performance improvements in IT portfolio management. Through investigation of software practices at a Fortune 500 company, we were able to demonstrate how

Daniel Goldsmith; Mit Sloan

2010-01-01T23:59:59.000Z

289

Developing a master plan for hospital solid waste management: A case study  

SciTech Connect

Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management.

Karamouz, Mohammad [School of Civil Engineering, University of Tehran, Tehran (Iran, Islamic Republic of)], E-mail: karamouz@ut.ac.ir; Zahraie, Banafsheh [School of Civil Engineering, University of Tehran, Tehran (Iran, Islamic Republic of)], E-mail: bzahraie@ut.ac.ir; Kerachian, Reza [School of Civil Engineering, University of Tehran, Tehran (Iran, Islamic Republic of)], E-mail: kerachian@ut.ac.ir; Jaafarzadeh, Nemat [Faculty of Health Science, University of Ahvaz, Ahvaz (Iran, Islamic Republic of)], E-mail: n_jaafarzadeh@yahoo.com; Mahjouri, Najmeh [School of Environmental Engineering, University of Tehran, Tehran (Iran, Islamic Republic of)], E-mail: mahjouri@ut.ac.ir

2007-07-01T23:59:59.000Z

290

Life-cycle assessment of municipal solid waste management alternatives with consideration of uncertainty: SIWMS development and application  

Science Conference Proceedings (OSTI)

This paper describes the development and application of the Stochastic Integrated Waste Management Simulator (SIWMS) model. SIWMS provides a detailed view of the environmental impacts and associated costs of municipal solid waste (MSW) management alternatives under conditions of uncertainty. The model follows a life-cycle inventory approach extended with compensatory systems to provide more equitable bases for comparing different alternatives. Economic performance is measured by the net present value. The model is verified against four publicly available models under deterministic conditions and then used to study the impact of uncertainty on Sydney's MSW management 'best practices'. Uncertainty has a significant effect on all impact categories. The greatest effect is observed in the global warming category where a reversal of impact direction is predicted. The reliability of the system is most sensitive to uncertainties in the waste processing and disposal. The results highlight the importance of incorporating uncertainty at all stages to better understand the behaviour of the MSW system.

El Hanandeh, Ali, E-mail: alel5804@uni.sydney.edu.a [School of Civil Engineering, Building J05, University of Sydney NSW 2006 (Australia); El-Zein, Abbas [School of Civil Engineering, Building J05, University of Sydney NSW 2006 (Australia)

2010-05-15T23:59:59.000Z

291

Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas  

SciTech Connect

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

ROGERS, P.M.

2000-06-01T23:59:59.000Z

292

15KV Class 25KVA Single-Phase IUT Prototype Development, Testing, and Performance Verification  

Science Conference Proceedings (OSTI)

EPRI is leading the development and demonstration of fully integrated, production-grade 4-kV and 15-kV-class solid-state transformers for integrating energy storage technologies and electric vehicle (EV) fast charging. The development team includes utilities, power electronics experts, and a transformer manufacturer to provide guidance on taking the technologies from concept to production. The intelligent universal transformer (IUT) technology has been validated through development and lab testing, ...

2013-12-12T23:59:59.000Z

293

Development and Validation of a Two-Phase, Three-Dimensional...  

NLE Websites -- All DOE Office Websites (Extended Search)

project addresses the following technical barriers from the Fuel Cells section of the Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan:...

294

Texas Wind Energy Forecasting System Development and Testing, Phase 1: Initial Testing  

Science Conference Proceedings (OSTI)

This report describes initial results from the Texas Wind Energy Forecasting System Development and Testing Project at a 75-MW wind project in west Texas.

2003-12-31T23:59:59.000Z

295

Low Wind Speed Technology Phase I: Clipper Turbine Development Project; Clipper Windpower Technology, Inc.  

DOE Green Energy (OSTI)

This fact sheet describes a subcontract with Clipper Windpower Technology, Inc. to develop a new turbine design that incorporates advanced elements.

Not Available

2006-03-01T23:59:59.000Z

296

Design and development of a test facility to study two-phase steam/water flow in porous media  

DOE Green Energy (OSTI)

The approach taken at Lawrence Berkeley Laboratory to obtain relative permeability curves and their dependence on fluid and matrix properties is summarized. Thermodynamic studies are carried out to develop the equations governing two-phase steam/water flow in porous media and to analyze the relationship between mass flow rate and flowing enthalpy. These relationships will be verified against experimental results and subsequently will be used to develop a field analysis technique to obtain in-situ relative permeability parameters. Currently our effort is concentrated on thermodynamic analysis and development of an experimental facility. Some of the findings of the theoretical work are presented and also the design and development effort for the experimental facility is described.

Verma, A.K.; Pruess, K.; Bodvarsson, G.S.; Tsang, C.F.; Witherspoon, P.A.

1983-12-01T23:59:59.000Z

297

Development of the severe accident management guidelines (SAMG) for Ulchin Nuclear Power Plant Unit 3, 4, 5 and 6  

SciTech Connect

This paper describes the development process of the severe accident management guidelines (SAMG) for Units 3, 4, 5 and 6 of Ulchin Nuclear Power Plant. The units are Korean Standard Nuclear Power (KSNP) plant, 1000 MWe class pressurized water reactor (PWR) with two loops of primary coolant system. The severe accident management guidelines for the units have been completed in 2002. The generic severe accident management guidance for Korean Standard Nuclear Power Plant has been used as the basis when developing Ulchin severe accident management guideline. Result of probabilistic safety assessment (PSA) for each unit was reviewed to integrate its insight into the SAMG. It indicates that each unit has a balanced design to any specific initiating events for core damage. Seven severe accident management strategies are applied in Ulchin SAMG. Seven strategies are (1) Inject into the steam generator (2) De-pressurize the RCS (3) Inject into the RCS (4) Inject into the containment (5) Control the fission product release into environment (6) Control the containment pressure and temperature and (7) Control hydrogen concentration in the containment. The range and capability of essential instrument for performing the strategies are assessed. Computational aids are developed to complement the unavailable instrument during the accident and to assist the operator's decision choosing strategies. To examine the ability of the SAMG to fulfill its intended function, small loss of coolant accident (SLOCA) with the failure of safety injection was selected as a reference scenario. The scenario was analyzed using MAAP code. The evaluation of the SAMG using this sequence has been successfully completed. (authors)

Kim, Hyeong T.; Yoo, Hojong; Lim, Hyuk Soon; Park, Jong W.; Lim, Woosang; Oh, Seung Jong [Korea Hydro and Nuclear Power Co., Ltd., 103-16 Munji-Dong, Yusung-Gu, Daejeon, 305-380 (Korea, Republic of); Chung, Chang Hyun [Seoul National University (Korea, Republic of); Lee, Byung Chul [Future and Challenges, Inc (Korea, Republic of)

2004-07-01T23:59:59.000Z

298

Recovery Act: High-Efficiency, Wideband Three-Phase Rectifiers and Adaptive Rectifier Management for Telecomm Central Office and Large Data Center Applications  

Science Conference Proceedings (OSTI)

Lineage Power and Verizon teamed up to address a DOE funding opportunity focused on improving the power conversion chain in telecommunications facilities and data centers. The project had three significant elements: the design and development of high efficiency and high power three-phase rectifiers by Lineage Power, design and development of software to optimize overall plant energy efficiency by Lineage Power, and a field trial in active Verizon telecommunications facilities where energy consumption was measured before and after efficiency upgrades.

Mark A. Johnson

2012-06-29T23:59:59.000Z

299

Great Plains ASPEN model development: executive summary. Final topical report for Phase 1  

Science Conference Proceedings (OSTI)

The Scientific Design Company contracted with the United States Department of Energy through its Morgantown Energy Technology Center to develop a steady-state simulation model of the Great Plains Coal Gasification plant. This plant produces substitute natural gas from North Dakota lignite. The model was to be developed using the ASPEN (Advanced System for Process Engineering) simulation program. The project was divided into the following tasks: (1) Development of a simplified overall model of the process to be used for a sensitivity analysis to guide the development of more rigorous section models. (2) Review and evaluation of existing rigorous moving-bed gasifier models leading to a recommendation of one to be used to model the Great Plains gasifiers. Adaption and incorporation of this model into ASPEN. (3) Review of the accuracy and completeness of the physical properties data and models provided by ASPEN that are required to characterize the Great Plains plant. Rectification of inaccurate or incomplete data. (4) Development of rigorous ASPEN models for critical unit operations and sections of the plant. (5) Evaluation of the accuracy of the ASPEN Cost Estimation and Evaluation System and upgrading where feasible. Development of a preliminary cost estimate for the Great Plains plant. (6) Validation of the simulation models developed in the course of this project. Determination of model sensitivity to variations of technical and economic parameters. (7) Documentation of all work performed in the course of this project. Essentially all of these tasks were completed successfully. 34 figs.

Rinard, I.H.; Stern, S.S.; Millman, M.C.; Schwint, K.J.; Benjamin, B.W.; Kirman, J.J.; Dweck, J.S.; Mendelson, M.A.

1986-07-25T23:59:59.000Z

300

Development of superior asphalt recycling agency: Phase 1, Technical feasibility. Technical progress report  

SciTech Connect

About every 12 years, asphalt roads must be reworked, and this is usually done by placing thick layers (hot-mix overlays) of new material on top of failed material, resulting in considerable waste of material and use of new asphalt binder. A good recycling agent is needed, not only to reduce the viscosity of the aged material but also to restore compatibility. Objective is to establish the technical feasibility (Phase I) of determining the specifications and operating parameters for producing high quality recycling agents which will allow most/all the old asphalt-based road material to be recycled. It is expected that supercritical fractionation can be used. The advanced road aging simulation procedure will be used to study aging of blends of old asphalt and recycling agents.

Bullin, J.A.; Glover, C.J.; Davison, R.R.; Lin, Moon-Sun; Chaffin, J.; Liu, Meng; Eckhardt, C.

1996-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Expanded High-Level Waste Glass Property Data Development: Phase I  

Science Conference Proceedings (OSTI)

Two separate test matrices were developed as part if the EM-21 Glass Matrix Crucible Testing. The first matrix, developed using a single component-at-a-time design method and covering glasses of interest primarily to Hanford, is addressed in this data package. This data package includes methods and results from glass fabrication, chemical analysis of glass compositions, viscosity, electrical conductivity, liquidus temperature, canister centerline cooling, product consistency testing, and the toxicity characteristic leach procedure.

Schweiger, Michael J.; Riley, Brian J.; Crum, Jarrod V.; Hrma, Pavel R.; Rodriguez, Carmen P.; Arrigoni, Benjamin M.; Lang, Jesse B.; Kim, Dong-Sang; Vienna, John D.; Raszewski, F. C.; Peeler, David K.; Edwards, Tommy B.; Best, D. R.; Reamer, Irene A.; Riley, W. T.; Simmons, P. T.; Workman, R. J.

2011-01-21T23:59:59.000Z

302

CRAD, Emergency Management - Idaho Accelerated Retrieval Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Idaho Accelerated Retrieval Project Phase II CRAD, Emergency Management - Idaho Accelerated Retrieval Project Phase II February 2006 A section of Appendix C...

303

Development and Integration of CRAFT in Distributed Energy Management system Environment  

Science Conference Proceedings (OSTI)

CRAFT (Customer Restoration and Fault Testing), an on-line expert system, is currently operating in the control center at Puget Sound Power & Light Company. CRAFT is tightly integrated with the energy management system (EMS) and appears as an EMS application to the dispatchers.

1997-03-10T23:59:59.000Z

304

Components of an Incident Management Simulation and Gaming Framework and Related Developments  

Science Conference Proceedings (OSTI)

The nation's emergency responders need to work in a coordinated, well-planned manner to best mitigate the impact of an emergency incident. They need to be trained and ready to act in view of the increased security threat. The training has been traditionally ... Keywords: architecture, component, emergency response, gaming, incident management, integration, modeling, simulation

Sanjay Jain; Charles R. Mclean

2008-01-01T23:59:59.000Z

305

Development and Demonstration of Energy Management Control Strategies for Automated Real-Time Pricing  

Science Conference Proceedings (OSTI)

Electric loads in commercial buildings can be automatically shifted or shed in response to variable energy prices, resulting in big cost savings for building owners and substantial load-reduction benefits for the energy company supplying the building. This project demonstrated the magnitude of savings possible with such an energy management system.

1998-11-23T23:59:59.000Z

306

Materials Reliability Program: Pressurized Water Reactor Internals Aging Management Program Development Template (MRP-342)  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) has completed and published guidance for managing the effects of aging degradation in pressurized water reactor (PWR) internals. The initial version of this report, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227, Revision 0), was submitted to the staff of the U. S. Nuclear Regulatory Commission (NRC) ...

2012-10-23T23:59:59.000Z

307

Important elements of disaster management and mitigation and design and development of a software tool  

Science Conference Proceedings (OSTI)

Natural Disasters causing damage to human life, property, infrastructure and economy has emerged as a global challenge. Requisite safety measures have to be provided for natural hazards. Prevention is better than cure. Once disaster occurred, it is very ... Keywords: catastrophe, disaster, industrial, management, mitigation, natural, plans

Gurumurthy Vijayan Iyer; Nikos E. Mastorakis

2006-06-01T23:59:59.000Z

308

Plan for a Nuclear Power Industry Life Cycle Management and Nuclear Asset Management Database  

Science Conference Proceedings (OSTI)

The database development plan in this report is the first phase of providing plants with a useful computerized compendium of existing worldwide equipment reliability, aging, and other life cycle management (LCM) and nuclear asset management (NAM) data for risk-based nuclear asset and project evaluation.

2003-05-30T23:59:59.000Z

309

The impact and management of cognitive gap in high performance product development organizations  

Science Conference Proceedings (OSTI)

The close alignment of applied research and development units with manufacturing operational structures can provide excellent opportunities for maintaining robust product pipelines and reducing product development cycle times. Within such an integrated ... Keywords: Adaption, Innovation, O3 (technological change), Organizational development, Problem solving, Product development, Research and development

Kathryn W. Jablokow; David E. Booth

2006-12-01T23:59:59.000Z

310

Assessing the Potential of Developing a Tool for Residential Facility Management Using Building Information Modeling Software  

E-Print Network (OSTI)

Building Information Modeling (BIM) has changed the ways buildings are designed and constructed. Along with design and construction, operation and maintenance of the built facility is also gaining importance in the Architecture-Engineering-Construction industry. Facility management (FM) is widely adopted by industrial, healthcare and other types of commercial facilities for better maintenance and management of assets. BIM is being adopted in the field of Facility management and has become one of the most important tools for better application of operation and maintenance. Facility management is performed by professionals with training and experience in the related fields of building operation, maintenance, upgrade and repair. BIM is a professional tool which requires intense training and knowledge. This tool cannot be used and is hard to understand for non-professionals and people who do not have training to use it. Management of residences is as important as management of commercial, industrial and healthcare facilities for the life and smooth running of such facilities. Residential facilities are properties with one or more residential units or buildings. These buildings could be low rise, high rise or individual units. This thesis will help in analyzing the scope of using BIM and Application Programming Interface (API) for management of maintenance in residences by the owner who are not professionally trained. The research analyzes a single, basic function of a BIM tool to determine the potential for such a tool to help non-expert, first time user to be able to understand their residential facilities maintenance requirements. It is an attempt to propose a system which provides alerts to the owners regarding required maintenance and which shows the location of the work in a 3D model. The system was designed and tested in Microsoft Windows 7 operating system by using Autodesk® Revit building information software to make the 3D model, a Revit API plug-in to craft the alerts and show the location of work and Open Database Connectivity (ODBC) to export the model to a web browser. The system worked through Revit program, but the concept of applying the system to work through web browser failed.

Madhani, Himanshu 1986-

2012-12-01T23:59:59.000Z

311

MHD advanced power train. Phase 1, Final report: Volume 2, Development program plan  

DOE Green Energy (OSTI)

Two scale-up steps are required before the 200 MW(e) power plant could be designed and constructed. The development program plan is designed to meet these 3 needed program elements: (a) design and demonstration test of a 50 MW(t) power train that verifies channel life; (b) design, development, and demonstration of an advanced power train in a 250 MW(t) plant facility; and (c) development of technology for advanced MHD generators that are economic of magnet warm bore, reliable for at least 4000 hours operation, and are amenable to automated production to meet the low cost goal. An implicit program element, Base Technology, provides support to these 3 elements. The overall program will require 11 years and is estimated to cost $278 million in 1984 dollars.

Jones, A.R.

1985-08-01T23:59:59.000Z

312

Efficient Phase-Change Materials: Development of a Low-Cost Thermal Energy Storage System Using Phase-Change Materials with Enhanced Radiation Heat Transfer  

Science Conference Proceedings (OSTI)

HEATS Project: USF is developing low-cost, high-temperature phase-change materials (PCMs) for use in thermal energy storage systems. Heat storage materials are critical to the energy storage process. In solar thermal storage systems, heat can be stored in these materials during the day and released at night—when the sun is not out—to drive a turbine and produce electricity. In nuclear storage systems, heat can be stored in these materials at night and released to produce electricity during daytime peak-demand hours. Most PCMs do not conduct heat very well. Using an innovative, electroless encapsulation technique, USF is enhancing the heat transfer capability of its PCMs. The inner walls of the capsules will be lined with a corrosion-resistant, high-infrared emissivity coating, and the absorptivity of the PCM will be controlled with the addition of nano-sized particles. USF’s PCMs remain stable at temperatures from 600 to 1,000°C and can be used for solar thermal power storage, nuclear thermal power storage, and other applications.

None

2011-12-05T23:59:59.000Z

313

Texas Wind Energy Forecasting System Development and Testing: Phase 2: 12-Month Testing  

Science Conference Proceedings (OSTI)

Wind energy forecasting systems are expected to support system operation in cases where wind generation contributes more than a few percent of total generating capacity. This report presents final results from the Texas Wind Energy Forecasting System Development and Testing Project at a 75-MW wind project in west Texas.

2004-09-30T23:59:59.000Z

314

Development and testing of a high-pressure downhole pump for jet-assist drilling. Topical report, Phase II  

Science Conference Proceedings (OSTI)

The goal of jet-assisted drilling is to increase the rate of penetration (ROP) in deeper gas and oil wells, where the rocks become harder and more difficult to drill. Increasing the ROP can result in fewer drilling days, and therefore, lower drilling cost. In late 1993, FlowDril and the Gas Research Institute (GRI) began a three-year development of a down hole pump (DHP{reg_sign}) capable of producing 30,000 psi out pressure to provide the high-pressure flow for high-pressure jet-assist of the drill bit. The U.S. Department of Energy (DOE) through its Morgantown, WV (DOE-Morgantown) field office, joined with GRI and FlowDril to develop and test a second prototype designed for drilling in 7-7/8 inch holes. This project, {open_quotes}Development and Testing of a High-Pressure Down Hole Pump for Jet-Assist Drilling,{close_quotes} is for the development and testing of the second prototype. It was planned in two phases. Phase I included an update of a market analysis, a design, fabrication, and an initial laboratory test of the second prototype. Phase II is continued iterative laboratory and field developmental testing. This report summarizes the results of Phase II. In the downhole pump approach shown in the following figure, conventional drill pipe and drill collars are used, with the DHP as the last component of the bottom hole assembly next to the bit. The DHP is a reciprocating double ended, intensifier style positive displacement, high-pressure pump. The drive fluid and the high-pressure output fluid are both derived from the same source, the abrasive drilling mud pumped downhole through the drill string. Approximately seven percent of the stream is pressurized to 30,000 psi and directed through a high-pressure nozzle on the drill bit to produce the high speed jet and assist the mechanical action of the bit to make it drill faster.

NONE

1997-10-01T23:59:59.000Z

315

Hardware Development of a Laboratory-Scale Microgrid Phase 2: Operation and Control of a Two-Inverter Microgrid  

SciTech Connect

This report summarizes the activities of the second year of a three-year project to develop control software for microsource distributed generation systems. In this phase, a laboratory-scale microgrid was expanded to include: (1) Two emulated distributed resources; (2) Static switchgear to allow rapid disconnection and reconnection; (3) Electronic synchronizing circuitry to enable transient-free grid interconnection; (4) Control software for dynamically varying the frequency and voltage controller structures; and (5) Power measurement instrumentation for capturing transient waveforms at the interconnect during switching events.

Illindala, M. S.; Piagi, P.; Zhang, H.; Venkataramanan, G.; Lasseter, R. H.

2004-03-01T23:59:59.000Z

316

Ford/DOE sodium-sulfur battery electric vehicle development and demonstration. Phase I-1. Final report  

DOE Green Energy (OSTI)

The results of Phase I-A analyses and design studies are presented. The objective of the Phase I-A effort was to evaluate the sodium-sulfur battery, in an existing conventional production automobile, as a potential power source for an electric vehicle. The Phase I-A work was divided into five (5) major sub-tasks as follows: vehicle specification sub-task; NaS battery packaging study sub-task; vehicle packaging layout sub-task; electrical system study sub-task; and system study sub-tasks covering performance and economy projections, powertrain and vehicle safety issues and thermal studies. The major results of the sodium-sulfur battery powered electric vehicle study program are: the Fiesta was chosen to be the production vehicle which would be modified into a 2-passenger, electric test bed vehicle powered by a NaS battery; the vehicle mission was defined to be a 2-passenger urban/suburban commuter vehicle capable of at least 100 miles range over the CVS driving cycle and a wide open throttle capability of 0 to 50 mph in 14 seconds, or less; powertrain component specifications were defined; powertrain control strategy has been selected; and a suitable test bed vehicle package scheme has been developed.

Not Available

1979-01-01T23:59:59.000Z

317

Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project  

SciTech Connect

This is the final report of Phase 2 of the Secure Power Systems Professional project, a 3 phase project. DOE will post to their website upon release.

O'Neil, Lori Ross; Assante, Michael; Tobey, D. H.; Conway, T. J.; Vanderhorst, Jr, T. J.; Januszewski, III, J.; leo, R.; Perman, K.

2013-08-26T23:59:59.000Z

318

Hybrid Tower Study: Volume 3: Phase 3 -- Scale Model Development and Full-Scale Tests  

Science Conference Proceedings (OSTI)

Hybrid towers maximize the power transmission efficiency of the available space whenever there is the need to have both ac and dc lines in the same corridor. This study developed calculation techniques and design rules for the placement of conductors energized with HVAC and HVDC circuits on the same towers. Significantly, the study did not identify any hybrid interactions that would prevent the successful operation of a hybrid corridor or hybrid tower transmission line.

1994-06-29T23:59:59.000Z

319

Development of a solar-desiccant dehumidifier. Phase II. Final summary report  

DOE Green Energy (OSTI)

The solar desiccant air conditioner (SODAC), its operation, characteristics of the major components, performance at design conditions, and the control schemes for optimum operation in various climates are described for both recirculated and ventilated configurations, with greater emphasis on the recirculated configuration. The development testing and the determination of the SODAC performance in both configurations over the entire range of interfacing parameters are reported. (LEW)

Rousseau, J.

1982-11-01T23:59:59.000Z

320

Wall collector design analysis: project status report No. 2. Hing/daylighting prototype development, Phase I  

DOE Green Energy (OSTI)

The design process and energy analyses for the wall (air) collector component for the passive/hybrid system building alternatives for pre-engineered metal buildings are described. A hybrid collector was coupled to the rockbed storage and ceiling plenum of the office and maintenance spaces. A thermosyphon collector was coupled directly to the interior space of the warehouse. The schematic design, design development, and performance analysis are included. (MHR)

Aronson, S.J.; deCampo, R.; Snyder, M.K.

1981-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Waste acid detoxification and reclamation: Phase 1, Project planning and concept development  

SciTech Connect

The objectives of this project are to develop processes for reducing the volume, quantity, and toxicity of metal-bearing waste acids. The primary incentives for implemeting these types of waste minimization processes are regulatory and economic in that they meet requirements in the Resource Conservation and Recovery Act and reduce the cost for treatment, storage, and disposal. Two precipitation processes and a distillation process are being developed to minimize waste from fuel fabrication operations, which comprise a series of metal-finishing operations. Waste process acids, such as HF/--/HNO/sub 3/ etch solutions contianing Zr as a major metal impurity and HNO/sub 3/ strip solutions containing Cu as a major metal impurity, are detoxified and reclaimed by concurrently precipitating heavy metals and regenerating acid for recycle. Acid from a third waste acid stream generated from chemical milling operations will be reclaimed using distillation. This stream comprises HNO/sub 3/ and H/sub 2/SO/sub 4/ which contains U as the major metal impurity. Distillation allows NO/sub 3//sup /minus// to be displaced by SO/sub 4//sup /minus/2/ in metal salts; free HNO/sub 3/ is then vaporized from the U-bearing sulfate stream. Uranium can be recovered from the sulfate stream in downstream precipitation step. These waste minimization processes were developed to meet Hanford's fuel fabrication process needs. 7 refs., 4 figs., 1 tab.

Stewart, T.L.; Brouns, T.M.

1988-02-01T23:59:59.000Z

322

Development of superior asphalt recycling agents. Phase 1, Technical feasibility. Final technical progress report  

Science Conference Proceedings (OSTI)

After an introduction and a literature survey in Chap. 1, Chap. 2 describes the tasks, together with objectives and important results obtained for each task throughout the entire project. Chaps. 3 thru 7 detail work in developing a qualitative and quantitative knowledge of asphalt oxidation, composition dependence of asphalt properties, and guidelines for producing superior asphalt binders through composition control. They also detail the development of a kinetic model for asphalt oxidative aging and present an understanding of the composition dependence of asphalt oxidation as well as other performance-related properties. Chaps. 8 and 9 compare the aging performance of recycled blends produced using commercial recycling agents and industrial supercritical fractions as rejuvenating agents. Oxidative aging of the recycled blends were evaluated along with the performance of the recycled blends in terms of the strategic highway research program performance grading procedure. Chap. 10 summarizes the work completed in the areas of processing schemes development, projection updates, and scale-up and commercialization plans.

Bullin, J.A.; Davison, R.R.; Glover, C.J.; Chaffin, J.; Liu, M.; Madrid, R.

1997-07-01T23:59:59.000Z

323

Design and Implementation of an International Training Program on Repository Development and Management  

Science Conference Proceedings (OSTI)

Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This paper discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)

Vugrin, K.W. [Sandia National Laboratories Carlsbad Programs Group, Performance Assessment and Decision Analysis Department, Carlsbad, NM (United States); Twitchell, Ch.A. [Sandia National Laboratories, Carlsbad Programs Group, Center Business Operations Department, Carlsbad, NM (United States)

2008-07-01T23:59:59.000Z

324

Development of a Modelling and Simulation Method Comparison and Selection Framework for Health Services Management  

E-Print Network (OSTI)

were car- ried out with local and national level health care man- agers to investigate their responses in depth. At the end of the project (after iterative revision of the tool), the national level health care manager at the NHS Institute of Innovation... and modelling in aerospace and the military Distributed Simulation, Discrete Event Simulation, System Dynamics, Real Time Simulation, Monte Carlo Simulation, Agent Based Simulation, War Gaming, Hybrid Simulation, Inverse Simulation, Petri-net, Markovian Model...

Jun, Gyuchan T; Morris, Zoe; Eldabi, Tillal; Harper, Paul; Naseer, Aisha; Patel, Brijesh; Clarkson, John P

2011-05-19T23:59:59.000Z

325

Risk-Managed Technical Specifications (RMTS) Guidelines: Technical Update to EPRI Interim Development Report 1002965  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has assessed the role of probabilistic risk assessment (PRA) in the regulation of nuclear power plant technical specifications. This report presents nuclear utilities with one example of a technical framework and associated general guidance for implementation of risk-managed technical specifications (RMTS) as a partial replacement of existing conventional plant technical specifications. This report was prepared by EPRI and the Westinghouse Owners Group (WOG) f...

2004-12-11T23:59:59.000Z

326

The Energy Services Provider as Corporate Engineer: A Partnership in Developing a Productive, Sustainable Energy Management Program  

E-Print Network (OSTI)

Industrial facilities can be large consumers of energy and have significant environmental aspects or impacts. Sustainable management of energy use and the environment is a growing concern for most industrial companies. Effective energy management can lower operating costs, improve profits, and contribute to a company’s progress in eco-efficiency and environmental responsibility. It is often difficult for a company to hire or designate the required person or team to focus on developing an effective energy management program. Developing such a program in an industrial environment can require abroad spectrum of experience and expertise. This paper provides an overview of a unique partnership between an industrial firm and an engineering firm that provides energy services. Cook Composites and Polymers Co. (CCP) is a world leader in the production and distribution of gel coat, composite polyester resins, coatings resins, dispersions, and emulsions. CCP operates at 12 locations in the United States. Burns & McDonnell (BMcD) is a large, multi-disciplined engineering firm with design-build and energy services capabilities. The firms have worked in the past on process design, environmental, and construction projects.

Imel, M.; Gromacki, M.

2007-01-01T23:59:59.000Z

327

Development of a direct-injected natural gas engine system for heavy-duty vehicles: Final report phase 1  

DOE Green Energy (OSTI)

The transportation sector accounts for approximately 65% of US petroleum consumption. Consumption for light-duty vehicles has stabilized in the last 10--15 years; however, consumption in the heavy-duty sector has continued to increase. For various reasons, the US must reduce its dependence on petroleum. One significant way is to substitute alternative fuels (natural gas, propane, alcohols, and others) in place of petroleum fuels in heavy-duty applications. Most alternative fuels have the additional benefit of reduced exhaust emissions relative to petroleum fuels, thus providing a cleaner environment. The best long-term technology for heavy-duty alternative fuel engines is the 4-stroke cycle, direct injected (DI) engine using a single fuel. This DI, single fuel approach maximizes the substitution of alternative fuel for diesel and retains the thermal efficiency and power density of the diesel engine. This report summarizes the results of the first year (Phase 1) of this contract. Phase 1 focused on developing a 4-stroke cycle, DI single fuel, alternative fuel technology that will duplicate or exceed diesel power density and thermal efficiency, while having exhaust emissions equal to or less than the diesel. Although the work is currently on a 3500 Series DING engine, the work is viewed as a basic technology development that can be applied to any engine. Phase 1 concentrated on DING engine component durability, exhaust emissions, and fuel handling system durability. Task 1 focused on identifying primary areas (e.g., ignition assist and gas injector systems) for future durability testing. In Task 2, eight mode-cycle-averaged NO{sub x} emissions were reduced from 11.8 gm/hp-hr (baseline conditions) to 2.5 gm/hp-hr (modified conditions) on a 3501 DING engine. In Task 3, a state-of-the-art fuel handling system was identified.

NONE

2000-03-02T23:59:59.000Z

328

Quantitative characterizations of phasic structure developments by local measurement methods in two-phase flow  

SciTech Connect

An experimental study on the internal structure an a out in a 25.4 mm ID pipe. The local void fraction and interfacial area concentration were measured by a double-sensor probe. The flow structure development was visualized by measuring the radial distribution of these two parameters at three axial, locations (L/D = 12, 62, and 112). A more detailed study on the fully developed flow structure was conducted at L/D = 120. The interfacial structure were measured by the double- and four-sensor probes. A bubbly to-=slug transition region was defined according to the local data.The area-averaged void fraction measurements were given by a gamma densitometer. Other parameters such as the Taylor bubble film thickness, bubble length and slug unit length in slug flow were measured by a film robe. The redundant measurements were made to calibrate the local probe measurements. The quantitative representation of the phasic structure can then be used for modeling.

Eberle, C.S. [Argonne National Lab., IL (United States); Leung, W.H.; Wu, Q.; Ueno, T.; Ishii, M. [Purdue Univ., Lafayette, IN (United States). School of Nuclear Engineering

1995-06-01T23:59:59.000Z

329

Ocean Thermal Energy Conversion power system development. Phase I. Final report  

DOE Green Energy (OSTI)

This report covers the conceptual and preliminary design of closed-cycle, ammonia, ocean thermal energy conversion power plants by Westinghouse Electric Corporation. Preliminary designs for evaporator and condenser test articles (0.13 MWe size) and a 10 MWe modular experiment power system are described. Conceptual designs for 50 MWe power systems, and 100 MWe power plants are also descirbed. Design and cost algorithms were developed, and an optimized power system design at the 50 MWe size was completed. This design was modeled very closely in the test articles and in the 10 MWe Modular Application. Major component and auxiliary system design, materials, biofouling, control response, availability, safety and cost aspects are developed with the greatest emphasis on the 10 MWe Modular Application Power System. It is concluded that all power plant subsystems are state-of-practice and require design verification only, rather than continued research. A complete test program, which verifies the mechanical reliability as well as thermal performance, is recommended and described.

Not Available

1978-12-04T23:59:59.000Z

330

Concrete concentrator panel development program for SolarOil project, Phase I  

DOE Green Energy (OSTI)

The results of the General Atomic (GA) fixed-mirror solar concentrator (FMSC) concrete panel development program are presented. The FMSC is part of the solar steam supply system proposed by GA for the SolarOil project. The program was conducted to determine the achievable accuracy of precast concrete concentrator panels and to investigate expedient and economical mass production of the panels. One steel form, two concrete forms, and three concrete panels were fabricated and about 1500 slat angle measurements made using a laser inspection fixture developed expressly for this purpose. All panels were 1.83 m (6 ft) long and had a 3.6 m (11 ft 10 in.) aperture and 71 slats. Proper concrete mixes, parting compounds, placement methods, vibrating techniques, and curing procedures were identified, and the hardware and techniques for stripping and turning the panels were tested. Based upon test results and structural calculations it was concluded that reasonably priced 5.5-m (18 ft) long panels can be produced with either steel or fiberglass-coated concrete forms with 95% to 99% of the slat area within +-0.25/sup 0/ of the desired angles. With steam curing, the production rate is one panel every other working day per 5.5 m (18 ft) of form length.

Nicolayeff, V.; Chow, G.S.; Koploy, M.

1980-05-01T23:59:59.000Z

331

Production of ethanol from refinery waste gases. Phase 3. Engineering development. Annual report, April 1, 1995--May 15, 1996  

DOE Green Energy (OSTI)

Refineries discharge large volumes of H2, CO, and CO 2 from cracking, coking, and hydrotreating operations. This R&D program seeks to develop, demonstrate, and commercialize a biological process for converting these waste gases into ethanol for blending with gasoline. A 200,000 BPD refinery could produce up to 38 million gallons ethanol per year. The program is being conducted in 3 phases: II, technology development; III, engineering development; and IV, demonstration. Phase I, exploratory development, has been completed. The research effort has yielded two strains (Isolates O-52 and C-01) which are to be used in the pilot studies to produce ethanol from CO, CO2, and H2 in petroleum waste gas. Results from single continuous stirred tank reactor (CSTR) laboratory tests have shown that 20-25 g/L ethanol can be produced with < 5 g/L acetic acid byproduct. Laboratory studies with two CSTRs in series have yielded ethanol concentrations of 30-35 g/L with 2-4 g/L acetic acid byproduct. Water recycle from distillation back to the fermenter shows that filtration of the water before distillation eliminates the recycle of toxic materials back to the fermenter. Product recovery in the process will use direct distillation to the azeotrope, followed by adsorption to produce neat ethanol. This is less energy intensive than e.g. solvent extraction, azeotropic distillation, or pervaporation. Economic projections are quite attractive; the economics are refinery stream dependent and thus vary depending on refinery location and operation.

Arora, D.; Basu, R.; Phillips, J.R.; Wikstrom, C.V.; Clausen, E.C; Gaddy, J.L.

1996-11-01T23:59:59.000Z

332

Design and development of Stirling engines for stationary-power-generation applications in the 500- to 3000-horsepower range. Phase I final report  

SciTech Connect

A program plan and schedule for the implementation of the proposed conceptual designs through the remaining four phases of the overall large Stirling engine development program was prepared. The objective of Phase II is to prepare more detailed designs of the conceptual designs prepared in Phase I. At the conclusion of Phase II, a state-of-the-art design will be selected from the candidate designs developed in Phase I for development. The objective of Phase III is to prepare manufacturing drawings of the candidate engine design. Also, detailed manufacturing drawings of both 373 kW (500 hp) and 746 kW (1000 hp) power pack skid systems will be completed. The power pack skid systems will include the generator, supporting skid, controls, and other supporting auxiliary subsystems. The Stirling cycle engine system (combustion system, Stirling engine, and heat transport system) will be mounted in the power pack skid system. The objective of Phase IV is to procure parts for prototype engines and two power pack skid systems and to assemble Engines No. 1 and 2. The objective of Phase V is to perform extensive laboratory and demonstration testing of the Stirling engines and power pack skid systems, to determine the system performance and cost and commercialization strategy. Scheduled over a 6 yr period the cost of phases II through V is estimated at $22,063,000. (LCL)

1980-10-01T23:59:59.000Z

333

Ownership transfer for non-federate object and time management in developing an hla compliant logistics model.  

Science Conference Proceedings (OSTI)

A seaport simulation model, PORTSIM, has been developed for the Department of Defense (DOD) at Argonne National Laboratory. PORTSIM simulates the detailed processes of cargo loading and unloading in a seaport and provides throughput capability, resource utilization, and other important information on the bottlenecks in a seaport operation, which are crucial data in determining troop and equipment deployment capability. There are two key problems to solve in developing the HLA-compliant PORTSIM model. The first is the cargo object ownership transfer problem. In PORTSIM, cargo items, e.g. vehicles, containers, and pallets, are objects having asset attributes. Cargo comes to a seaport for loading or unloading. The ownership of a cargo object transfers from its carrier to the port and then from the port to a new carrier. Each owner of the cargo object is responsible for publishing and updating the attributes of the cargo object when it has the ownership. This creates a unique situation in developing the PORTSIM federate object model, that is, the ownership of the object instead of the attributes needs to be changed in handling the cargo object in the PORTSIM federate. The ownership management service provided by the current RTI does not directly address this issue. The second is the time management issue. PORTSIM is an event-driven simulation that models seaport operations over time. To make PORTSIM HLA compliant, time management must be addressed to allow for synchronization with other simulation models. This paper attempts to address these two issues and methodologies developed for solving these two problems.

Li, Z.

1998-01-12T23:59:59.000Z

334

DEVELOPMENT OF CLAD CERAMIC FUEL PLATES BY SPRAY-COATING TECHNIQUES. Final Report, Phase I  

SciTech Connect

Activities in a program to develop techniques of plasma spraying clad plate-type UO/sub 2/ fuel elements are reported. The investigation was also directed toward determining the limitations of the process as applied to fuel element fabrication. UO/sub 2/ powder coatings having densities of 90% theoretical were produced. At conditions required for spraying plates, densities of 86% appear to be practical. The rate and efficiency of UO/sub 2/ coating deposition were also determined for various spraying conditions. Gritblasting was found to provide the best surface for coating adherence. The O/U ratio of the UO/sub 2/ was maintained by spraying in an Ar atmosphere. Zircaloy-2 was found to be the most desirable cladding material. Cladding thicknesses of 0.035 in. are required in distortion-free 2-in.-wide plates. (J.R.D.)

Weare, N.E.

1961-10-31T23:59:59.000Z

335

Development of a solar desiccant dehumidifier. Phase II. Technical progress report  

DOE Green Energy (OSTI)

The effort reported is a continuation of the development testing of the 1.5-ton solar desiccant air conditioner (SODAC) and is concerned with determination of the SODAC performance in the recirculated and ventilated mode configuration. Test data in the recirculated mode are presented. As originally conceived, the SODAC features two-speed indoor and outdoor fans to permit more efficient operation at reduced capacity. In both full-flow and half-flow cases, the experimental data are compared to computer predictions. The system and its operation are described, as are the system test facility and procedures. The system description includes the characteristics of the major components, the performance at design conditions, and the control schemes for optimum operation in various climates. (LEW)

Rousseau, J.

1981-03-27T23:59:59.000Z

336

Report on Performance of Prototype Dynatronix Power Supplies Developed Under a Phase I DOE SBIR  

SciTech Connect

The purpose of this study is to evaluate the prototype power supplies fabricated by Dynatronix, Inc. This project supports the advancement of electroforming capabilities to produce ultra-high purity copper. Ultra-high purity copper is an essential material used for a range of current and future fundamental nuclear physics programs such as the MAJORANA DEMONSTRATOR. The Mach 30 power supplies are a new design built to the specifications from the requirements of Pacific Northwest National Laboratory (PNNL) with regard to timing, voltage, current output, and the required tolerances. The parameters used in these tests were developed empirically over a number of years based on a combination of thermodynamic and kinetics of the electroplating process. The power supplies were operated in a typical cleanroom environment for the production electroforming at PNNL. The units that were received by PNNL in July, 2010 have performed satisfactorily and have demonstrated short term durability.

Hoppe, Eric W.; Merriman, Jason H.

2011-03-01T23:59:59.000Z

337

Knowledge management in a software development environment to support software processes deployment  

Science Conference Proceedings (OSTI)

Software Engineering is a wide area of knowledge and various other types of knowledge are required during the software development and maintenance. This paper describes a survey carried out to characterize the importance given by software developers ...

Gleison Santos; Karina Villela; Mariano Montoni; Ana Regina Rocha; Guilherme H. Travassos; Sávio Figueiredo; Sômulo Mafra; Adriano Albuquerque; Benito Diaz Paret; Márcio Amaral

2005-04-01T23:59:59.000Z

338

Small job development software project documentation for the activity management system. Revision 1  

SciTech Connect

This document contains all the required software development documentation as required by WHC-CM-3-10, software practices.

Gates, T.A.; Burdick, M.B.

1994-09-22T23:59:59.000Z

339

PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT  

SciTech Connect

The commercialization path of the Calderon technology for making a feedstock for steelmaking with assistance from DOE initially focused on making coke and work was done which proved that the Calderon technology is capable of making good coke for hard driving blast furnaces. U.S. Steel which participated in such demonstration felt that the Calderon technology would be more meaningful in lowering the costs of making steel by adapting it to the making of iron--thus obviating the need for coke. U.S. Steel and Calderon teamed up to jointly work together to demonstrate that the Calderon technology will produce in a closed system iron units from iron concentrate (ore) and coal competitively by eliminating pelletizing, sintering, coking and blast furnace operation. If such process steps could be eliminated, a huge reduction in polluting emissions and greenhouse gases (including CO{sub 2}) relating to steelmaking would ensue. Such reduction will restructure the steel industry away from the very energy-intensive steelmaking steps currently practiced and drastically reduce costs of making steel. The development of a technology to lower U.S. steelmaking costs and become globally competitive is a priority of major importance. Therefore, the development work which Calderon is conducting presently under this Agreement with the U.S. Department of Energy becomes more crucial than ever. During the 3rd quarter of 2005 which the present report covers, virtually all the effort to advance the Calderon technology to make iron units was concentrated towards forming a team with a steelmaker who needs both iron units in the form of hot metal and a substitute for natural gas (SNG), both being major contributors to higher costs in steelmaking. Calderon felt that a very good candidate would be Steel Dynamics (SDI) by virtue that it operates a rotary hearth facility in Butler, Indiana that uses large amounts of natural gas to reduce briquettes made from ore and coal that they subsequently melt in a submerged arc furnace that is a large consumer of electric power. This facility is operated as a division of SDI under the name of Iron Dynamics (IDI). It is no secret that IDI has had and still has a great number of operational problems, including high cost for natural gas.

Albert Calderon

2005-10-14T23:59:59.000Z

340

Structural Composites Industries 4-kilowatt wind-system development. Phase I. Design and analysis executive summary  

DOE Green Energy (OSTI)

A 4 kW small wind energy conversion system (SWECS) has been designed for residential applications in which relatively low (10 mph) mean annual wind speeds prevail. The objectives were to develop such a machinee to produce electrical energy at 6 cents per kWh while operating in parallel with a utility grid or auxiliary generator. Extensive trade, optimization and analytical studies were performed in an effort to provide the optimum machine to best meet the objectives. Certain components, systems and manufacturing processes were tested and evaluated and detail design drawings were produced. The resulting design is a 31-foot diameter horizontal axis downwind machine rated 5.7 kW and incorporating composite blades; free-standing composite tower; and torque-actuated blade pitch control. The design meets or exceeds all contract requirements except that for cost of energy. The target 6 cents per kWh will be achieved in a mean wind speed slightly below 12 mph instead of the specified 10 mph.

Malkine, N.; Bottrell, G.; Weingart, O.

1981-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Evaluation of storage/transportation options to support criteria development for the Phase I MRS (Monitored Retrievable Storage)  

SciTech Connect

The Department of Energy's (DOE) Office of Civilian Waste Management (OCRWM) plans to develop an interim storage facility to enable acceptance of spent fuel in 1998. It is estimated that this interim storage facility would be needed for about two years. A Monitored Retrievable Storage (MRS) facility is anticipated in 2000 and a repository in 2010. Acceptance and transport of spent fuel by DOE/OCRWM in 1998 will require an operating transportation system. Because this interim storage facility is not yet defined, development of an optimally compatible transportation system is not a certainty. In order to assure a transport capability for 1998 acceptance of spent fuel, it was decided that the OCRWM transportation program had to identify likely options for an interim storage facility, including identification of the components needed for compatibility between likely interim storage facility options and transportation. Primary attention was given to existing hardware, although conceptual designs were also considered. A systems-based probabilistic decision model was suggested by Sandia National Laboratories and accepted by DOE/OCRWM's transportation program. Performance of the evaluation task involved several elements of the transportation program. This paper describes the decision model developed to accomplish this task, along with some of the results and conclusions. 1 ref., 4 figs.

Sorenson, K.B.; Brown, N.N.; Bennett, P.C. (Sandia National Labs., Albuquerque, NM (USA)); Lake, W. (USDOE Office of Civilian Radioactive Waste Management, Washington, DC (USA))

1991-01-01T23:59:59.000Z

342

Evaluation of storage/transportation options to support criteria development for the Phase I MRS (Monitored Retrievable Storage)  

SciTech Connect

The Department of Energy's (DOE) Office of Civilian Waste Management (OCRWM) plans to develop an interim storage facility to enable acceptance of spent fuel in 1998. It is estimated that this interim storage facility would be needed for about two years. A Monitored Retrievable Storage (MRS) facility is anticipated in 2000 and a repository in 2010. Acceptance and transport of spent fuel by DOE/OCRWM in 1998 will require an operating transportation system. Because this interim storage facility is not yet defined, development of an optimally compatible transportation system is not a certainty. In order to assure a transport capability for 1998 acceptance of spent fuel, it was decided that the OCRWM transportation program had to identify likely options for an interim storage facility, including identification of the components needed for compatibility between likely interim storage facility options and transportation. Primary attention was given to existing hardware, although conceptual designs were also considered. A systems-based probabilistic decision model was suggested by Sandia National Laboratories and accepted by DOE/OCRWM's transportation program. Performance of the evaluation task involved several elements of the transportation program. This paper describes the decision model developed to accomplish this task, along with some of the results and conclusions. 1 ref., 4 figs.

Sorenson, K.B.; Brown, N.N.; Bennett, P.C. (Sandia National Labs., Albuquerque, NM (USA)); Lake, W. (USDOE Office of Civilian Radioactive Waste Management, Washington, DC (USA))

1991-01-01T23:59:59.000Z

343

Advances in Conjugated Linoleic Acid Research, Volume 3Chapter 5 New Developments in Silver Ion and Reverse Phase HPLC of CLA  

Science Conference Proceedings (OSTI)

Advances in Conjugated Linoleic Acid Research, Volume 3 Chapter 5 New Developments in Silver Ion and Reverse Phase HPLC of CLA Health Nutrition Biochemistry eChapters Health - Nutrition - Biochemistry Press   ...

344

Development of Hydrologic Characterization Technology of Fault Zones -- Phase I, 2nd Report  

Science Conference Proceedings (OSTI)

This is the year-end report of the 2nd year of the NUMO-LBNL collaborative project: Development of Hydrologic Characterization Technology of Fault Zones under NUMO-DOE/LBNL collaboration agreement, the task description of which can be found in the Appendix 3. Literature survey of published information on the relationship between geologic and hydrologic characteristics of faults was conducted. The survey concluded that it may be possible to classify faults by indicators based on various geometric and geologic attributes that may indirectly relate to the hydrologic property of faults. Analysis of existing information on the Wildcat Fault and its surrounding geology was performed. The Wildcat Fault is thought to be a strike-slip fault with a thrust component that runs along the eastern boundary of the Lawrence Berkeley National Laboratory. It is believed to be part of the Hayward Fault system but is considered inactive. Three trenches were excavated at carefully selected locations mainly based on the information from the past investigative work inside the LBNL property. At least one fault was encountered in all three trenches. Detailed trench mapping was conducted by CRIEPI (Central Research Institute for Electric Power Industries) and LBNL scientists. Some intriguing and puzzling discoveries were made that may contradict with the published work in the past. Predictions are made regarding the hydrologic property of the Wildcat Fault based on the analysis of fault structure. Preliminary conceptual models of the Wildcat Fault were proposed. The Wildcat Fault appears to have multiple splays and some low angled faults may be part of the flower structure. In parallel, surface geophysical investigations were conducted using electrical resistivity survey and seismic reflection profiling along three lines on the north and south of the LBNL site. Because of the steep terrain, it was difficult to find optimum locations for survey lines as it is desirable for them to be as straight as possible. One interpretation suggests that the Wildcat Fault is westerly dipping. This could imply that the Wildcat Fault may merge with the Hayward Fault at depth. However, due to the complex geology of the Berkeley Hills, multiple interpretations of the geophysical surveys are possible. iv An effort to construct a 3D GIS model is under way. The model will be used not so much for visualization of the existing data because only surface data are available thus far, but to conduct investigation of possible abutment relations of the buried formations offset by the fault. A 3D model would be useful to conduct 'what if' scenario testing to aid the selection of borehole drilling locations and configurations. Based on the information available thus far, a preliminary plan for borehole drilling is outlined. The basic strategy is to first drill boreholes on both sides of the fault without penetrating it. Borehole tests will be conducted in these boreholes to estimate the property of the fault. Possibly a slanted borehole will be drilled later to intersect the fault to confirm the findings from the boreholes that do not intersect the fault. Finally, the lessons learned from conducting the trenching and geophysical surveys are listed. It is believed that these lessons will be invaluable information for NUMO when it conducts preliminary investigations at yet-to-be selected candidate sites in Japan.

Karasaki, Kenzi; Onishi, Tiemi; Black, Bill; Biraud, Sebastien

2009-03-31T23:59:59.000Z

345

Development of the environmental management integrated baseline at the Idaho National Engineering Laboratory using systems engineering  

SciTech Connect

The Idaho National Engineering Laboratory (INEL) is one of many Department of Energy (DOE) national laboratories that has been performing environmental cleanup and stabilization, which was accelerated upon the end of the cold war. In fact, the INEL currently receives two-thirds of its scope to perform these functions. However, the cleanup is a highly interactive system that creates an opportunity for systems engineering methodology to be employed. At the INEL, a group called EM (Environmental Management) Integration has been given this charter along with a small core of systems engineers. This paper discusses the progress to date of converting the INEL legacy system into one that uses the systems engineering discipline as the method to ensure that external requirements are met.

Murphy, J.A.; Caliva, R.M.; Wixson, J.R.

1997-10-01T23:59:59.000Z

346

Research and development of proton-exchange membrane (PEM) fuel cell system for transportation applications. Phase I final report  

DOE Green Energy (OSTI)

Objective during Phase I was to develop a methanol-fueled 10-kW fuel cell power source and evaluate its feasibility for transportation applications. This report documents research on component (fuel cell stack, fuel processor, power source ancillaries and system sensors) development and the 10-kW power source system integration and test. The conceptual design study for a PEM fuel cell powered vehicle was documented in an earlier report (DOE/CH/10435-01) and is summarized herein. Major achievements in the program include development of advanced membrane and thin-film low Pt-loaded electrode assemblies that in reference cell testing with reformate-air reactants yielded performance exceeding the program target (0.7 V at 1000 amps/ft{sup 2}); identification of oxidation catalysts and operating conditions that routinely result in very low CO levels ({le} 10 ppm) in the fuel processor reformate, thus avoiding degradation of the fuel cell stack performance; and successful integrated operation of a 10-kW fuel cell stack on reformate from the fuel processor.

NONE

1996-01-01T23:59:59.000Z

347

High performance steam development. Final report, Phase No. 3: 1500{degree}F steam plant for industrial cogeneration prototype development tests  

Science Conference Proceedings (OSTI)

As a key part of DOE`s and industry`s R&D efforts to improve the efficiency, cost, and emissions of power generation, a prototype High Performance Steam System (HPSS) has been designed, built, and demonstrated. The world`s highest temperature ASME Section I coded power plant successfully completed over 100 hours of development tests at 1500{degrees}F and 1500 psig on a 56,000 pound per hour steam generator, control valve and topping turbine at an output power of 5500 hp. This development advances the HPSS to 400{degrees}F higher steam temperature than the current best technology being installed around the world. Higher cycle temperatures produce higher conversion efficiencies and since steam is used to produce the large majority of the world`s power, the authors expect HPSS developments will have a major impact on electric power production and cogeneration in the twenty-first century. Coal fueled steam plants now produce the majority of the United States electric power. Cogeneration and reduced costs and availability of natural gas have now made gas turbines using Heat Recovery Steam Generators (HRSG`s) and combined cycles for cogeneration and power generation the lowest cost producer of electric power in the United States. These gas fueled combined cycles also have major benefits in reducing emissions while reducing the cost of electricity. Development of HPSS technology can significantly improve the efficiency of cogeneration, steam plants, and combined cycles. Figure 2 is a TS diagram that shows the HPSS has twice the energy available from each pound of steam when expanding from 1500{degrees}F and 1500 psia to 165 psia (150 psig, a common cogeneration process steam pressure). This report describes the prototype component and system design, and results of the 100-hour laboratory tests. The next phase of the program consists of building up the steam turbine into a generator set, and installing the power plant at an industrial site for extended operation.

Duffy, T.; Schneider, P.

1996-01-01T23:59:59.000Z

348

DOE - Office of Legacy Management -- Union Mines Development Corp - NY 0-22  

Office of Legacy Management (LM)

Mines Development Corp - NY Mines Development Corp - NY 0-22 FUSRAP Considered Sites Site: UNION MINES DEVELOPMENT CORP. (NY.0-22) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Union Carbide NY.0-22-1 Location: New York , New York NY.0-22-1 Evaluation Year: 1987 NY.0-22-1 Site Operations: The company owned uranium mines or reserves located in the western U.S. NY.0-22-1 Site Disposition: Eliminated - No reason to believe radioactive material was used at this site NY.0-22-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated NY.0-22-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to UNION MINES DEVELOPMENT CORP.

349

Development of a management regime for the eastern Pacific tuna fishery.  

E-Print Network (OSTI)

??Thesis – University of WashingtonThe eastern Pacific tropical tuna fishery has developed in the last seven decades from its antecedents in a small pole-and-line fishery for… (more)

Barrett, Izadore

2009-01-01T23:59:59.000Z

350

The Development of a Smart Distribution Grid Testbed for Integrated Information Management Systems  

Science Conference Proceedings (OSTI)

This paper presents a smart distribution grid testbed to test or compare designs of integrated information management systems (I2MSs). An I2MS extracts and synthesizes information from a wide range of data sources to detect abnormal system behaviors, identify possible causes, assess the system status, and provide grid operators with response suggestions. The objective of the testbed is to provide a modeling environment with sufficient data sources for the I2MS design. The testbed includes five information layers and a physical layer; it generates multi-layer chronological data based on actual measurement playbacks or simulated data sets produced by the physical layer. The testbed models random hardware failures, human errors, extreme weather events, and deliberate tampering attempts to allow users to evaluate the performance of different I2MS designs. Initial results of I2MS performance tests showed that the testbed created a close-to-real-world environment that allowed key performance metrics of the I2MS to be evaluated.

Lu, Ning; Du, Pengwei; Paulson, Patrick R.; Greitzer, Frank L.; Guo, Xinxin; Hadley, Mark D.

2011-07-28T23:59:59.000Z

351

Planning manual for energy resource development on Indian lands. Volume II. Management and contractual arrangements  

DOE Green Energy (OSTI)

This volume explores options for strengthening tribal control of energy-resource-development activities on their reservations. These options fall into two major categories: improvement of the tribe's internal administrative capability to plan, monitor, and regulate development activities; Part I of this volume addresses how this can be done. Another option deals with stronger and more-explicit contract terms in the development, agreement, and enforcement of those terms; Part II deals with this subject. In order to develop an effective control system, a tribe must be concerned with both of these areas. Contract stipulations will not be effective unless the tribe can ensure that they are enforced. Likewise, in monitoring and regulating company activities, a tribe is in a stronger position if it is backed up by contract terms governing operations on the reservation. The Tribes participating in this study have different levels of managerial capability and technical expertise in the energy field. Their interest in stronger controls on development varies. Therefore, a range of options is suggested.

Not Available

1978-03-01T23:59:59.000Z

352

Work Manager  

Science Conference Proceedings (OSTI)

A real-time control system has been developed and deployed nationally to support BT‘s work management programme. This paper traces the history, system architecture, development, deployment and service aspects of this very large programme. Many ...

G. J. Garwood

1997-01-01T23:59:59.000Z

353

Ocean thermal energy conversion power system development-I. Phase I. Preliminary design report. Volume 1. Final report  

DOE Green Energy (OSTI)

The results of a conceptual and preliminary design study of Ocean Thermal Energy Conversion (OTEC) closed loop ammonia power system modules performed by Lockheed Missiles and Space Company, Inc. (LMSC) are presented. This design study is the second of 3 tasks in Phase I of the Power System Development-I Project. The Task 2 objectives were to develop: 1) conceptual designs for a 40 to 50-MW(e) closed cycle ammonia commercial plant size power module whose heat exchangers are immersed in seawater and whose ancillary equipments are in a shirt sleeve environment; preliminary designs for a modular application power system sized at 10-MW(e) whose design, construction and material selection is analogous to the 50 MW(e) module, except that titanium tubes are to be used in the heat exchangers; and 3) preliminary designs for heat exchanger test articles (evaporator and condenser) representative of the 50-MW(e) heat exchangers using aluminum alloy, suitable for seawater service, for testing on OTEC-1. The reference ocean platform was specified by DOE as a surface vessel with the heat exchanger immersed in seawater to a design depth of 0 to 20 ft measured from the top of the heat exchanger. For the 50-MW(e) module, the OTEC 400-MW(e) Plant Ship, defined in the Platform Configuration and Integration study, was used as the reference platform. System design, performance, and cost are presented. (WHK)

Not Available

1978-12-18T23:59:59.000Z

354

An integrated multicriteria decision-making methodology for outsourcing management  

Science Conference Proceedings (OSTI)

In this study, an outsourcer evaluation and management system is developed for a textile company by use of fuzzy goal programming (FGP). At first phase of the methodology, evaluation criteria for the outsourcers and the objectives of the company are ... Keywords: Fuzzy goal programming, Outsourcer management, Outsourcer/supplier selection, PROMETHEE

Ceyhun Araz; Pinar Mizrak Ozfirat; Irem Ozkarahan

2007-12-01T23:59:59.000Z

355

Development of a smart e-health portal for chronic disease management  

Science Conference Proceedings (OSTI)

In developed countries, chronic disease now accounts for more than 75% of health care expenditure and nearly an equivalent percentage of disease related deaths. In response to these changes in disease demographics and the economic imperatives caused ... Keywords: chronic disease, decision support, e-health portal

Maryam Haddad; Girija Chetty

2012-09-01T23:59:59.000Z

356

Obtaining data for wind farm development and management: the EO-WINDFARM project  

E-Print Network (OSTI)

). That sector has a mean growth rate of 30% for the last two years. The total installed wind power capacity of development of these EO-based services are evoked. Introduction The Kyoto objectives are stated into the White sources for producing electricity. For Europe, the part of renewable energy sources in electricity

357

Development of Micro/Nano-Scale Sensors for Investigation of Heat Transfer in Multi-Phase Flows  

E-Print Network (OSTI)

The objective of this investigation was to develop micro/nano-scale temperature sensors for measuring surface temperature transients in multi-phase flows and heat transfer. Surface temperature fluctuations were measured on substrates exposed to phase change processes. Prior reports in the literature indicate that these miniature scale surface temperature fluctuations can result in 60-90 percent of the total heat flux during phase change heat transfer. In this study, DTS (Diode Temperature Sensors) were fabricated with a doping depth of ~100 nm on n-type silicon to measure the surface temperature transients on a substrate exposed to droplet impingement cooling. DTS are expected to have better sensor characteristics compared to TFTs (Thin Film Thermocouples), due to their small size and faster response (which comes at the expense of the smaller operating temperature range). Additional advantages of DTS include the availability of robust commercial micro fabrication processes (with diode and transistor node sizes currently in the size range of ~ 30 nm), and that only 2N wire leads can be used to interrogate a set of N x N array of sensors (in contrast thermocouples require 2 N x N wire leads for N x N sensor array). The DTS array was fabricated using conventional semi-conductor processes. The temperature response of the TFT and DTS was also calibrated using NIST standards. Transient temperature response of the DTS was recorded using droplet impingement cooling experiments. The droplet impingement cooling experiments were performed for two different test fluids (acetone and ethanol). An infrared camera was used to verify the surface temperature of the substrate and compare these measurements with the temperature values recorded by individual DTS. PVD (Physical Vapor Deposition) was used for obtaining the catalyst coatings for subsequent CNT synthesis using CVD (Chemical Vapor Deposition) as well as for fabricating the thin film thermocouple (TFT) arrays using the "lift-off" process. Flow boiling experiments were conducted for three different substrates. Flow boiling experiments on bare silicon wafer surface were treated as the control experiment, and the results were compared with that of CNT (Carbon Nano-Tube) coated silicon wafer surfaces. Similar experiments were also performed on a pure copper surface. In addition, experiments were performed using compact condensers. Micro-scale patterns fabricated on the refrigerant side of the compact heat exchanger were observed to cause significant enhancement of the condensation heat transfer coefficient.

Jeon, Sae Il

2011-08-01T23:59:59.000Z

358

Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center(FRMAC) - Emergency Phase  

SciTech Connect

Homeland Security Presidential Directive HSPD-5 requires all federal departments and agencies to adopt a National Incident Management System (NIMS)/Incident Command System (ICS) and use it in their individual domestic incident management and emergency prevention, preparedness, response, recovery, and mitigation programs and activities, as well as in support of those actions taken to assist state and local entities. This system provides a consistent nationwide template to enable federal, state, local, and tribal governments, private-sector, and nongovernmental organizations to work together effectively and efficiently to prepare for, prevent, respond to, and recover from domestic incidents, regardless of cause, size, or complexity, including acts of catastrophic terrorism. This document identifies the operational concepts of the Federal Radiological Monitoring and Assessment Center's (FRMAC) implementation of the NIMS/ICS response structure under the National Response Plan (NRP). The construct identified here defines the basic response template to be tailored to the incident-specific response requirements. FRMAC's mission to facilitate interagency environmental data management, monitoring, sampling, analysis, and assessment and link this information to the planning and decision staff clearly places the FRMAC in the Planning Section. FRMAC is not a mitigating resource for radiological contamination but is present to conduct radiological impact assessment for public dose avoidance. Field monitoring is a fact-finding mission to support this effort directly. Decisions based on the assessed data will drive public protection and operational requirements. This organizational structure under NIMS is focused by the mission responsibilities and interface requirements following the premise to provide emergency responders with a flexible yet standardized structure for incident response activities. The coordination responsibilities outlined in the NRP are based on the NIMS/ICS construct and Unified Command (UC) for management of a domestic incident. The NRP Nuclear/Radiological Incident Annex (NUC) further provides requirements and protocols for coordinating federal government capabilities to respond to nuclear/radiological Incidents of National Significance (INS) and other radiological incidents. When a FRMAC is established, it operates under the parameters of NIMS as defined in the NRP. FRMAC and its operations have been modified to reflect NIMS/ICS concepts and principles and to facilitate working in a Unified Command structure. FRMAC is established at or near the scene of the incident to coordinate radiological monitoring and assessment and is established in coordination with the U.S. Department of Homeland Security (DHS); the coordinating agency; other federal agencies; and state, local, and tribal authorities. However, regardless of the coordinating agency designation, U.S. Department of Energy (DOE) coordinates radiological monitoring and assessment activities for the initial phases of the offsite federal incident response through the Radiological Assistance Program (RAP) and FRMAC assets. Monitoring and assessment data are managed by FRMAC in an accountable, secure, and retrievable format. Monitoring data interpretations, including exposure rate contours, dose projections, and any requested radiological assessments are to be provided to the DHS; to the coordinating agency; and to state, local, and tribal government agencies.

NSTec Environmental Restoration

2007-04-01T23:59:59.000Z

359

Development of Novel active transport membrane devices. Phase I. Final report, 31 October 1988--31 January 1994  

DOE Green Energy (OSTI)

The main objective of this program was to identify and develop a technique for fabricating Active Transport Materials (ATM) into lab-scale membrane devices. Air Products met this objective by applying thin film, multilayer fabrication techniques to support the AT material on a substrate membrane. In Phase IA, spiral-wound hollow fiber membrane modules were fabricated and evaluated. These nonoptimized devices were used to demonstrate the AT-based separation of carbon dioxide from methane, hydrogen sulfide from methane, and ammonia from hydrogen. It was determined that a need exists for a more cost efficient and less energy intensive process for upgrading subquality natural gas. Air Products estimated the effectiveness of ATM for this application and concluded that an optimized ATM system could compete effectively with both conventional acid gas scrubbing technology and current membrane technology. In addition, the optimized ATM system would have lower methane loss and consume less energy than current alternative processes. Air Products made significant progress toward the ultimate goal of commercializing an advanced membrane for upgrading subquality natural gas. The laboratory program focused on developing a high performance hollow fiber substrate and fabricating and evaluating ATM-coated lab-scale hollow fiber membrane modules. Selection criteria for hollow fiber composite membrane supports were developed and used to evaluate candidate polymer compositions. A poly(amide-imide), PAI, was identified for further study. Conditions were identified which produced microporous PAI support membrane with tunable surface porosity in the range 100-1000{Angstrom}. The support fibers exhibited good hydrocarbon resistance and acceptable tensile strength though a higher elongation may ultimately be desirable. ATM materials were coated onto commercial and PAI substrate fiber. Modules containing 1-50 fibers were evaluated for permselectivity, pressure stability, and lifetime.

Laciak, D.V.; Quinn, R.; Choe, G.S.; Cook, P.J.; Tsai, Fu-Jya

1994-08-01T23:59:59.000Z

360

Characterization of uranium contaminated soils from DOE Fernald Environmental Management Project Site: Results of Phase 1 characterization  

Science Conference Proceedings (OSTI)

The Integrated Demonstration (ID) for remediation of uranium- contaminated soils has been established by the DOE Office of Technology Development. The Fernald (Feed Materials Production Center) site was selected as the DOE facility for the field demonstration. The principle objective of this ID is to evaluate and compare the versatility, efficiency, and economics of various technologies that may be combined into systems for the removal of uranium from contaminated soils. Several leaching solutions were employed to determine their effectiveness in extracting uranium from the soil. The extractants and their means of preparation were: 0.1 N nitric acid [HNO{sub 3}]: 6.25 mL of concentrated nitric acid was diluted to 1 L with distilled water; 2% ammonium carbonate [(NH{sub 4}){sub 2}CO{sub 3}]: 20 g of (NH{sub 4}){sub 2}CO{sub 3} was dissolved in distilled water and diluted to 1 L; 5% sodium hypochlorite (NaOCl): 50 mL of NaOCl reagent (Cl HCl) in 0.01 N nitric acid: 6.95 g (NH{sub 2}OH{center_dot}HCl) was dissolved and diluted to 1 L with 0.01 N HNO{sub 3}. The 0.01 N nitric acid was prepared by diluting 3 mL concentrated nitric acid to 5 L with distilled water; and the sodium citrate-bicarbonate-dithionite (CBD) method: 0.3 M sodium citrate (88 g tribasic sodium citrate, Na{sub 3}C{sub 6}H{sub 5}O{sub 7}{center_dot}2H{sub 2}O, per liter); 1 M sodium bicarbonate (84 g NaHCO{sub 3} per liter); and 5 g sodium dithionite, Na{sub 2}S{sub 2}O{sub 4}.

Lee, S.Y.; Marsh, J.D. Jr.

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Characterization of uranium contaminated soils from DOE Fernald Environmental Management Project Site: Results of Phase 1 characterization  

SciTech Connect

The Integrated Demonstration (ID) for remediation of uranium- contaminated soils has been established by the DOE Office of Technology Development. The Fernald (Feed Materials Production Center) site was selected as the DOE facility for the field demonstration. The principle objective of this ID is to evaluate and compare the versatility, efficiency, and economics of various technologies that may be combined into systems for the removal of uranium from contaminated soils. Several leaching solutions were employed to determine their effectiveness in extracting uranium from the soil. The extractants and their means of preparation were: 0.1 N nitric acid [HNO{sub 3}]: 6.25 mL of concentrated nitric acid was diluted to 1 L with distilled water; 2% ammonium carbonate [(NH{sub 4}){sub 2}CO{sub 3}]: 20 g of (NH{sub 4}){sub 2}CO{sub 3} was dissolved in distilled water and diluted to 1 L; 5% sodium hypochlorite (NaOCl): 50 mL of NaOCl reagent (Cl < 6%) was diluted to 1 L with distilled water; 0.1 M ethylenediaminetetraacetric acid, disodium salt (EDTA): 37.224 g EDTA was dissolved in distilled water and diluted to 1 L; 2% citric acid monohydrate solution (H{sub 3}C{sub 6}H{sub 5}O{sub 7}{center_dot}H{sub 2}O): 20 g of critic acid was diluted to 1 L with distilled water; 0.1 M hydroxylamine-hydrochloride (NH{sub 2}OH{center_dot}HCl) in 0.01 N nitric acid: 6.95 g (NH{sub 2}OH{center_dot}HCl) was dissolved and diluted to 1 L with 0.01 N HNO{sub 3}. The 0.01 N nitric acid was prepared by diluting 3 mL concentrated nitric acid to 5 L with distilled water; and the sodium citrate-bicarbonate-dithionite (CBD) method: 0.3 M sodium citrate (88 g tribasic sodium citrate, Na{sub 3}C{sub 6}H{sub 5}O{sub 7}{center_dot}2H{sub 2}O, per liter); 1 M sodium bicarbonate (84 g NaHCO{sub 3} per liter); and 5 g sodium dithionite, Na{sub 2}S{sub 2}O{sub 4}.

Lee, S.Y.; Marsh, J.D. Jr.

1992-01-01T23:59:59.000Z

362

Development of Real-Time Fuel Management Capability at the Texas A&M Nuclear Science Center  

E-Print Network (OSTI)

For the Texas A&M University Nuclear Science Center reactor a fuel depletion code was created to develop real-time fuel management capability. This code package links MCNP8 and ORIGEN26 and is interfaced through a Visual Basic code. Microsoft Visual Basic was used to create a user interface and for pre-and post-processing of MCNP and ORIGEN2 output. MCNP was used to determine the flux for all fuel and control rods within the core while ORIGEN2 used this flux along with the power history to calculate buildup and depletion for tracking the fuel isotopic evolution through time. A comparison of MCNP calculated fluxes and measured flux values were used to confirm the validity of the MCNP model. A comparison to Monteburns was used to add confidence to the correctness of the calculated fuel isotopics. All material isotopics were stored in a Microsoft Access database for integration with the Visual Basic code to allow for isotopics report generation for the Nuclear Science Center staff. This fuel management code performs its function with reasonable accuracy. It gathers minimal information from the user and burns the core over daily operation. After execution it stores all material data to the database for further use within NSCRFM or for isotopic report generation.

Parham, Neil A.

2010-05-01T23:59:59.000Z

363

Technology development program for Idaho Chemical Processing Plant spent fuel and waste management  

SciTech Connect

Acidic high-level radioactive waste (HLW) resulting from fuel reprocessing at the Idaho Chemical Processing Plant (ICPP) for the U.S. Department of Energy (DOE) has been solidified to a calcine since 1963 and stored in stainless steel bins enclosed by concrete vaults. Several different types of unprocessed irradiated DOE-owned fuels are also in storage at the ICPP. In April, 1992, DOE announced that spent fuel would no longer be reprocessed to recover enriched uranium and called for a shutdown of the reprocessing facilities at the ICPP. A new Spent Fuel and HLW Technology Development program was subsequently initiated to develop technologies for immobilizing ICPP spent fuels and HLW for disposal, in accordance with the Nuclear Waste Policy Act. The Program elements include Systems Analysis, Graphite Fuel Disposal, Other Spent Fuel Disposal, Sodium-Bearing Liquid Waste Processing, Calcine Immobilization, and Metal Recycle/Waste Minimization. This paper presents an overview of the ICPP radioactive wastes and current spent fuels, and describes the Spent Fuel and HLW Technology program in more detail.

Ermold, L.F.; Knecht, D.A.; Hogg, G.W.; Olson, A.L.

1993-08-01T23:59:59.000Z

364

EERE PROJECT MANAGEMENT CENTER NEPA DI!Tl!RlInNATION RECIPIENT:Ohio Department of Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

,",C:'Fn. ,",C:'Fn. : ..... ! . u.s. DEPARTMI!NI OFI!Nl!RGY EERE PROJECT MANAGEMENT CENTER NEPA DI!Tl!RlInNATION RECIPIENT:Ohio Department of Development PROJECT TITLE: SEP ARRA - French Creek Bioenergy Page I of3 ~'" @ STATE: OH Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number EEOOOO165 GF0-0000165-022 GOO Based on my review of the Information concerning tbe proposed .cliontlls NEPA Compliance Officer (authoru.ed under DOE Order 4St.IA).1 bave made the following dete ... minatton: ex. EA, [IS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

365

DEACTIVATION MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT MANAGEMENT The purpose here is to provide information for specific aspects of project management that apply to deactivation. Overall management of deactivation projects should use a traditional project management approach, and as such is not addressed. The following specific topics are based on lessons learned during deactivation of DOE facilities.  The Deactivation Mission  The Stabilization/Deactivation "Customer"  Project Approach for a Complex Facility  Establishing the Overall End-State  Viewing Deactivation in Two Phases  Early Decisions  Early Deactivation Tasks  Facility-Specific Commitments  Hazard Reduction  Detailed End-Points  Set Up Method and Criteria  Post-Deactivation S&M Plan

366

Waterway Management Districts (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

Waterway management districts are established to manage and supervise the use and development of waterways in municipalities with populations between 29,600 and 29,900.

367

Development of a scintillation flow-cell detection system for environmental restoration and waste management applications  

Science Conference Proceedings (OSTI)

A flow-cell detection system was developed utilizing a coincidence circuit and tested with BaF{sub 2}, CaF{sub 2}:Eu and scintillating glass. The coincidence detection system reduced the background from {approximately}200 cps to {approximately}0.5 cps. The detection efficiencies for these cells ranged from 0.38 to 0.66 for {sup 45}Ca beta particles (E{sub max} = 0.257 MeV) and from 0.45 to 0.52 for {sup 233}U alpha particles (E{sub {alpha}} = 4.8 MeV). The minimum detectable activity was calculated for a 30 s count time and determined to be in the range of 1-2 Bq.

DeVol, T.A.; Branton, S.D.; Fjeld, R.A.

1996-05-01T23:59:59.000Z

368

Sustainable Water Resources Management, Volume 1: Executive Summary  

Science Conference Proceedings (OSTI)

This report summarizes the findings of a three-phase research project investigating sustainable water management. The report will be of value to all parties interested in the water aspects of sustainable development. As it contains information at various scales of water management, the report will be of interest for those involved with green building projects, the public water supply, stormwater management, wastewater treatment and the electric power sector. In addition, the report provides valuable insi...

2010-01-15T23:59:59.000Z

369

Recommendations for improvements to program and project management  

SciTech Connect

Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

Not Available

1994-01-01T23:59:59.000Z

370

Energy management action plan: Developing a strategy for overcoming institutional barriers to municipal energy conservation  

SciTech Connect

Energy offices working to improve efficiency of local government facilities face not only technical tasks, but institutional barriers, such as budget structures that do not reward efficiency, a low awareness of energy issues, and purchasing procedures based only on minimizing initial cost. The bureau, in working to remove such barriers in San Francisco, has identified 37 institutional barriers in areas such as operations & maintenance, purchasing, and facility design; these barriers were then reorganized into three groupings-- policy & attitudes, budget & incentives, and awareness & information-- and mapped. This map shows that the barriers mutually reinforce each other, and that a holistic approach is required for permanent change. The city`s recreation & parks department was used as a model department, and information about facility energy use was compiled into a departmental energy review. Staff interviews showed how barriers affect conservation. The bureau then generated ideas for projects to remove specific barriers and rated them according to potential impact and the resources required to implement them. Four of the six projects selected focused on maintenance staff: a cost- sharing lighting retrofit program, a boiler efficiency program, a departmental energy tracking system, and a budgetary incentive program for conservation. The other two projects are city-wide: promotion of a new term contract supplying energy-efficient light materials, and publication/distribution of ENERGY NEWS newsletter. A general methodology, the EMAP Strategy Guide, has been created to assist other energy offices in developing EMAPs.

1992-12-31T23:59:59.000Z

371

Development of a high temperature solar powered water chiller. Volume 3. Phase I technical progress report, September 26, 1977--June 1, 1978  

DOE Green Energy (OSTI)

This section describes the conceptual design rationale and resulting design configuration as well as providing estimates of cost and performance. Because the development of the turbo-compressor design paralleled the development of the chiller system design, all of the cost and performance data are based on intermediate turbo-compressor performance data, as well as on unoptimized components. Optimized performance was computed at the very end of Phase I, and only a brief comparison is made to show the potential gains available. Updating of all the predicted performance data for the final conceptual design will await Phase II.

English, R. A.

1978-06-01T23:59:59.000Z

372

Liquid phase methanol process development unit: installation, operation, and support studies. Topical report. Experimental catalyst preparation program  

DOE Green Energy (OSTI)

This report details the preparation of 29 catalyst samples under DOE contract No. DE-AC22-81PC30019. These were selected for gas phase activity testing from a total of 70 prepared. Based on activity results, three compositions were selected for further slurry phase testing in the Chem Systems, Inc. (CSI) laboratories. 11 references, 5 figures, 7 tables.

Not Available

1984-01-01T23:59:59.000Z

373

Powder River Basin Coalbed Methane Development and Produced Water Management Study  

DOE Green Energy (OSTI)

Coalbed methane resources throughout the entire Powder River Basin were reviewed in this analysis. The study was conducted at the township level, and as with all assessments conducted at such a broad level, readers must recognize and understand the limitations and appropriate use of the results. Raw and derived data provided in this report will not generally apply to any specific location. The coal geology in the basin is complex, which makes correlation with individual seams difficult at times. Although more than 12,000 wells have been drilled to date, large areas of the Powder River Basin remain relatively undeveloped. The lack of data obviously introduces uncertainty and increases variability. Proxies and analogs were used in the analysis out of necessity, though these were always based on sound reasoning. Future development in the basin will make new data and interpretations available, which will lead to a more complete description of the coals and their fluid flow properties, and refined estimates of natural gas and water production rates and cumulative recoveries. Throughout the course of the study, critical data assumptions and relationships regarding gas content, methane adsorption isotherms, and reservoir pressure were the topics of much discussion with reviewers. A summary of these discussion topics is provided as an appendix. Water influx was not modeled although it is acknowledged that this phenomenon may occur in some settings. As with any resource assessment, technical and economic results are the product of the assumptions and methodology used. In this study, key assumptions as well as cost and price data, and economic parameters are presented to fully inform readers. Note that many quantities shown in various tables have been subject to rounding; therefore, aggregation of basic and intermediate quantities may differ from the values shown.

Advanced Resources International

2002-11-30T23:59:59.000Z

374

Development of colorimetric solid Phase Extraction (C-SPE) for in-flight Monitoring of spacecraft Water Supplies  

SciTech Connect

Although having recently been extremely successful gathering data on the surface of Mars, robotic missions are not an effective substitute for the insight and knowledge about our solar system that can be gained though first-hand exploration. Earlier this year, President Bush presented a ''new course'' for the U.S. space program that shifts NASA's focus to the development of new manned space vehicles to the return of humans to the moon. Re-establishing the human presence on the moon will eventually lead to humans permanently living and working in space and also serve as a possible launch point for missions into deeper space. There are several obstacles to the realization of these goals, most notably the lack of life support and environmental regeneration and monitoring hardware capable of functioning on long duration spaceflight. In the case of the latter, past experience on the International Space Station (ISS), Mir, and the Space Shuttle has strongly underscored the need to develop broad spectrum in-flight chemical sensors that: (1) meet current environmental monitoring requirements on ISS as well as projected requirements for future missions, and (2) enable the in-situ acquisition and analysis of analytical data in order to further define on-orbit monitoring requirements. Additionally, systems must be designed to account for factors unique to on-orbit deployment such as crew time availability, payload restrictions, material consumption, and effective operation in microgravity. This dissertation focuses on the development, ground testing, and microgravity flight demonstration of Colorimetric Solid Phase Extraction (C-SPE) as a candidate technology to meet the near- and long-term water quality monitoring needs of NASA. The introduction will elaborate further on the operational and design requirements for on-orbit water quality monitoring systems by discussing some of the characteristics of an ''ideal'' system. A description of C-SPE and how the individual components of the platform are combined to satisfy many of these requirements is then presented, along with a literature review on the applications of C-SPE and similar sorption-spectrophotometric techniques. Finally, a brief overview of diffuse reflection spectroscopy and the Kubelka-Munk function, which are used to quantify analytes via C-SPE, is presented.

Daniel Bryan Gazda

2004-12-19T23:59:59.000Z

375

The North American Multi-Model Ensemble (NMME): Phase-1 Seasonal to Interannual Prediction, Phase-2 Toward Developing Intra-Seasonal Prediction  

Science Conference Proceedings (OSTI)

The recent US National Academies report “Assessment of Intraseasonal to Interannual Climate Prediction and Predictability” was unequivocal in recommending the need for the development of a North American Multi-Model Ensemble (NMME) operational predictive ...

Ben P. Kirtman; Dughong Min; Johnna M. Infanti; James L. Kinter III; Daniel A. Paolino; Qin Zhang; Huug van den Dool; Suranjana Saha; Malaquias Pena Mendez; Emily Becker; Peitao Peng; Patrick Tripp; Jin Huang; David G. DeWitt; Michael K. Tippett; Anthony G. Barnston; Shuhua Li; Anthony Rosati; Siegfried D. Schubert; Michele Rienecker; Max Suarez; Zhao E. Li; Jelena Marshak; Young-Kwon Lim; Joseph Tribbia; Kathleen Pegion; William J. Merryfield; Bertrand Denis; Eric F. Wood

376

Program on Technology Innovation: EPRI Materials Management Matrix (MMM) Project  

Science Conference Proceedings (OSTI)

The Economic Simplified Boiling Water Reactor (ESBWR) Risk Priority Evaluation is the third activity supporting development of the ESBWR Materials Management Matrix (MMM). The first phase involved developing a list of in-scope components and materials of construction. The second phase focused on development of an ESBWR-specific Degradation Matrix (DM), which supplies important input into the Risk Priority Evaluation process documented in this report, and can help in understanding the opinions of material...

2008-03-24T23:59:59.000Z

377

Development of a Front Tracking Method for Two-Phase Micromixing of Incompressible Viscous Fluids with Interfacial Tension in Solvent Extraction  

SciTech Connect

This progress report describes the development of a front tracking method for the solution of the governing equations of motion for two-phase micromixing of incompressible, viscous, liquid-liquid solvent extraction processes. The ability to compute the detailed local interfacial structure of the mixture allows characterization of the statistical properties of the two-phase mixture in terms of droplets, filaments, and other structures which emerge as a dispersed phase embedded into a continuous phase. Such a statistical picture provides the information needed for building a consistent coarsened model applicable to the entire mixing device. Coarsening is an undertaking for a future mathematical development and is outside the scope of the present work. We present here a method for accurate simulation of the micromixing dynamics of an aqueous and an organic phase exposed to intense centrifugal force and shearing stress. The onset of mixing is the result of the combination of the classical Rayleigh- Taylor and Kelvin-Helmholtz instabilities. A mixing environment that emulates a sector of the annular mixing zone of a centrifugal contactor is used for the mathematical domain. The domain is small enough to allow for resolution of the individual interfacial structures and large enough to allow for an analysis of their statistical distribution of sizes and shapes. A set of accurate algorithms for this application requires an advanced front tracking approach constrained by the incompressibility condition. This research is aimed at designing and implementing these algorithms. We demonstrate verification and convergence results for one-phase and unmixed, two-phase flows. In addition we report on preliminary results for mixed, two-phase flow for realistic operating flow parameters.

Zhou, Yijie [ORNL; Lim, Hyun-Kyung [ORNL; de Almeida, Valmor F [ORNL; Navamita, Ray [State University of New York, Stony Brook; Wang, Shuqiang [State University of New York, Stony Brook; Glimm, James G [ORNL; Li, Xiao-lin [State University of New York, Stony Brook; Jiao, Xiangmin [ORNL

2012-06-01T23:59:59.000Z

378

Developing a holistic strategy for integrated waste management within municipal planning: Challenges, policies, solutions and perspectives for Hellenic municipalities in the zero-waste, low-cost direction  

SciTech Connect

The present position paper addresses contemporary waste management options, weaknesses and opportunities faced by Hellenic local authorities. It focuses on state-of-the-art, tested as well as innovative, environmental management tools on a municipal scale and identifies a range of different collaboration schemes between local authorities and related service providers. Currently, a policy implementation gap is still experienced among Hellenic local authorities; it appears that administration at the local level is inadequate to manage and implement many of the general policies proposed; identify, collect, monitor and assess relevant data; and safeguard efficient and effective implementation of MSWM practices in the framework of integrated environmental management as well. This shortfall is partly due to the decentralisation of waste management issues to local authorities without a parallel substantial budgetary and capacity support, thus resulting in local activity remaining often disoriented and isolated from national strategies, therefore yielding significant planning and implementation problems and delays against pressing issues at hand as well as loss or poor use of available funds. This paper develops a systemic approach for MSWM at both the household and the non-household level, summarizes state-of-the-art available tools and compiles a set of guidelines for developing waste management master plans at the municipal level. It aims to provide a framework in the MSWM field for municipalities in Greece as well as other countries facing similar problems under often comparable socioeconomic settings.

Zotos, G. [Division of Business Studies, Dept. of Economics, Aristotle University, GR-54124, Thessaloniki (Greece); Karagiannidis, A. [Laboratory of Heat Transfer and Environmental Engineering, Dept. of Mechanical Engineering, Aristotle University, GR-54124, Thessaloniki (Greece); Zampetoglou, S. [Municipal Development Company of Kalamaria, GR-55132 (Greece); Malamakis, A. [Laboratory of Heat Transfer and Environmental Engineering, Dept. of Mechanical Engineering, Aristotle University, GR-54124, Thessaloniki (Greece)], E-mail: amalama@aix.meng.auth.gr; Antonopoulos, I.-S.; Kontogianni, S. [Laboratory of Heat Transfer and Environmental Engineering, Dept. of Mechanical Engineering, Aristotle University, GR-54124, Thessaloniki (Greece); Tchobanoglous, G. [Department of civil and environmental Engineering, University of California, Davis (United States)

2009-05-15T23:59:59.000Z

379

Research, development and demonstration of a fuel cell/battery powered bus system. Phase 1, Final report  

DOE Green Energy (OSTI)

Purpose of the Phase I effort was to demonstrate feasibility of the fuel cell/battery system for powering a small bus (under 30 ft or 9 m) on an urban bus route. A brassboard powerplant was specified, designed, fabricated, and tested to demonstrate feasibility in the laboratory. The proof-of-concept bus, with a powerplant scaled up from the brassboard, will be demonstrated under Phase II.

NONE

1990-02-28T23:59:59.000Z

380

Development of prototype guidelines for risk management against terror attack in the tourism industry: a Delphi study  

E-Print Network (OSTI)

The purpose of the study was to gather strategies and factors from tourism security professionals from which terrorism risk management policies can be developed. This study utilized the Delphi method in order to provide structure for the group process. Twelve tourism security experts made up the panel completing three rounds of questionnaires via the email based Delphi technique. This research identified fifty-four strategies to reduce the propensity of terror attack at a tourism venue. Those strategies were divided into four levels of priority based on criticality and feasibility. The fifty-four strategies were grouped into nine subordinate categories. The subordinate categories were related to Training, Communications/ Liaison, Planning/ Assessment, Background Checks, ID Badges/ Secure Entrance, Specialty Security Units, Architectural Design, Media Cooperation, and Technology Based strategies. Alongside the strategies are a collection of comments by the experts regarding strengths, weaknesses, and any barriers to implementation pertaining to the individual strategy. Tourism risk managers, security personnel, and insurance underwriters can all use the results in reducing the opportunity for a terrorist attack at a tourism venue. Major research findings from this study included: 1. The strategy receiving the highest criticality ranking over all other strategies involves training first responders on their role in circumventing the success of terrorists. 2. The subordinate category Communication/ Liaison contains the largest number of strategies indicating the significance of this category among experts. 3. The subordinate category of Specialty Security Units contains the second highest number of strategies indicating the importance of the topic among experts. 4. All of the technology based strategies fell into the lowest priority level. Based on the findings of this study, researcher recommendations include: 1. The guidelines developed in this study should be used by operators of tourism venues to make the best use of limited resources. 2. National or international conferences should be established to further discuss these issues. 3. A greater number of communications mediums should be established to facilitate the exchange of ideas and experiences between affected professionals. 4. Insurance providers should use this information to establish validated guidelines so that, if prospective clients adhered to the recommendations, a reduction in premiums could be offered. 5. Other entities may benefit from this study, such as public school systems, the energy production industry, hospital systems, and pipeline systems.

Smith, Clifford Keith

2003-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER June 29, 2011 - 12:00pm Addthis Media Contact Brad Bugger (208) 526-0833 Idaho Falls, ID - The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and government engineering and management, including an eight month stint as acting Deputy Manager for EM. He has extensive experience in business management associated with program planning, development and administration. His experience includes all project phases from conceptual planning, cost and

382

Integrating complex ecological information to develop a management plan for Chinese tallow (Sapium sebiferum L. Roxb.) in south Georgia.  

E-Print Network (OSTI)

??Managing pernicious invasive plant species is an essential component of maintaining biodiversity and restoring natural ecosystem structure and function. Chinese tallow (Sapium sebiferum L. Roxb.)… (more)

McCormick, Cheryl Marie

2007-01-01T23:59:59.000Z

383

FINAL REPORT: PHASE FOUR HIGHWAY MAINTENANCE CONCEPT VEHICLE  

E-Print Network (OSTI)

the maintenance management system. Phase IV has two major strands, technical and financial. The outcome of Phase ................................................................................................................. 55 AMS-200 (Application Management System) Console innovation in highway maintenance management, maintenance operations practices, and research. CTRE provided

Beresnev, Igor

384

Desiccant-Based Combined Systems: Integrated Active Desiccant Rooftop Hybrid System Development and Testing Final Report- Phase 4  

SciTech Connect

This report summarizes the results of a research and development (R&D) program to design and optimize an active desiccant-vapor compression hybrid rooftop system. The primary objective was to combine the strengths of both technologies to produce a compact, high-performing, energy-efficient system that could accommodate any percentage of outdoor air and deliver essentially any required combination of temperature and humidity, or sensible heat ratio (SHR). In doing so, such a product would address the significant challenges imposed on the performance capabilities of conventional packaged rooftop equipment by standards 62 and 90.1 of the American Society of Heating, Refrigerating and Air-Conditioning Engineers. The body of work completed as part of this program built upon previous R&D efforts supported by the U.S. Department of Energy and summarized by the Phase 3b report ''Active Desiccant Dehumidification Module Integration with Rooftop Packaged HVAC Units'' (Fischer and Sand 2002), in addition to Fischer, Hallstrom, and Sand 2000; Fischer 2000; and Fischer and Sand 2004. All initial design objectives established for this development program were successfully achieved. The performance flexibility desired was accomplished by a down-sized active desiccant wheel that processes only a portion of the supply airflow, which is pre-conditioned by a novel vapor compression cycle. Variable-speed compressors are used to deliver the capacity control required by a system handling a high percentage of outdoor air. An integrated direct digital control system allows for control capabilities not generally offered by conventional packaged rooftop systems. A 3000-cfm prototype system was constructed and tested in the SEMCO engineering test laboratory in Columbia, MO, and was found to operate in an energy-efficient fashion relative to more conventional systems. Most important, the system offered the capability to independently control the supply air temperature and humidity content to provide individual sensible and latent loads required by an occupied space without over-cooling and reheating air. The product was developed using a housing construction similar to that of a conventional packaged rooftop unit. The resulting integrated active desiccant rooftop (IADR) is similar in size to a currently available conventional rooftop unit sized to provide an equivalent total cooling capacity. Unlike a conventional rooftop unit, the IADR can be operated as a dedicated outdoor air system processing 100% outdoor air, as well as a total conditioning system capable of handling any ratio of return air to outdoor air. As part of this R&D program, a detailed investigation compared the first cost and operating cost of the IADR with costs for a conventional packaged approach for an office building located in Jefferson City, MO. The results of this comparison suggest that the IADR approach, once commercialized, could be cost-competitive with existing technology--exhibiting a one-year to two-year payback period--while simultaneously offering improved humidity control, indoor air quality, and energy efficiency.

Fischer, J

2005-05-06T23:59:59.000Z

385

ADMINISTRATIVE AND RESOURCE MANAGEMENT  

E-Print Network (OSTI)

development of risk management- relatedITservicesthatbenefittheentireUCsystem. The systems developed at UC and maintenance have diminished so dramatically. #12;7 ADMINISTRATIVE AND RESOURCE MANAGEMENT AnnuAl RepoRt 2010, are collaborating to implement a new asset management, work management, and integrated planning system

Hammock, Bruce D.

386

Office of Safety and Emergency Management Evaluations Protocol for the Development and Maintenance of Criteria and Review Approach Documents, July 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

<: <: iisS Offlct of Hulth , S.ftly ind St curity OFFICE OF SAFETY AND EMERGENCY MANAGEMENT EVALUATIONS PROTOCOL FOR THE DEVELOPMENT AND MAINTENANCE OF CRITERIA AND REVIEW APPROACH DOCUMENTS July 2013 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Office of Safety and Emergency Management Evaluations Protocol for the Development and Maintenance of Criteria and Review Approach Documents July 2013 Reviewed by: 1 .. ~~·\? Approved by: William E. Mi.lier Date Deputy Director Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight /\ Thomas R. Stak~r Deputy Director for Oversight Office of Enforcement and Oversight Office of Health, Safety and Security

387

Management Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Immobilization Research Immobilization Research Kurt Gerdes U.S. DOE, Office of Engineering and Technology John Vienna Pacific Northwest National Laboratory Environmental Management May 19, 2009 2009 Hanford - Idaho - Savannah River Technical Exchange 2 Objectives Perform research and development to advance the waste stabilization technology options by through closely- coupled theory, experimentation, and modeling Develop solutions for Hanford, Idaho, Savannah River, and Oak Ridge wastes challenges (along with facilitating management of future wastes) Environmental Management General Approach Balance between near-term incremental technology improvements and long-term transformational solutions Address the requirements for high risk waste streams - high-level tank waste (RPP, SRS)

388

Improved Battery Pack Thermal Management to Reduce Cost and Increase Energy Density: Cooperative Research and Development Final Report, CRADA Number CRD-12-499  

SciTech Connect

Under this CRADA NREL will support Creare's project for the Department of Energy entitled 'Improved Battery Pack Thermal Management to Reduce Cost and Increase Energy Density' which involves the development of an air-flow based cooling product that increases energy density, safety, and reliability of hybrid electric vehicle battery packs.

Smith, K.

2013-10-01T23:59:59.000Z

389

Novel selective surface flow (SSF{trademark}) membranes for the recovery of hydrogen from waste gas streams. Phase 2: Technology development, final report  

SciTech Connect

The objective of Phase II of the Selective Surface Flow Membrane program was Technology Development. Issues addressed were: (i) to develop detailed performance characteristics on a 1 ft{sup 2} multi- tube module and develop design data, (ii) to build a field test rig and complete field evaluation with the 1 ft{sup 2} area membrane system, (iii) to implement membrane preparation technology and demonstrate membrane performance in 3.5 ft long tube, (iv) to complete detailed process design and economic analysis.

Anand, M.; Ludwig, K.A.

1996-04-01T23:59:59.000Z

390

Fluor Hanford Integrated Safety Management System Phase 1 Verification 04/12/2000 Thru 04/28/2000 Volume 1 and 2  

SciTech Connect

The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78).

PARSONS, J.E.

2000-03-01T23:59:59.000Z

391

Fluor Hanford Integrated Safety Management System Phase 1 Verification 04/12/2000 Thru 04/28/2000 Volume 1 and 2  

E-Print Network (OSTI)

The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78).

Parsons, J E

2000-01-01T23:59:59.000Z

392

Advanced Nuclear Technology: Impact of EPRI Pre-Operational and Operational Configuration Management Report (1022684) on the Nuclear Industry  

Science Conference Proceedings (OSTI)

EPRI Technical Report 1022684, Elements of Pre-Operational and Operational Configuration Management for a New Nuclear Facility, was developed by an EPRI Advanced Nuclear Technology (ANT) technical advisory group whose mission was to develop guidance for establishing a comprehensive configuration management (CM) program for the unique challenges of a new nuclear facility. The program elements developed for the pre-operation phase would then be in place to manage the configuration for the ...

2013-03-20T23:59:59.000Z

393

Design and Development of a Test Facility to Study Two-Phase Steam/Water Flow in Porous Media  

DOE Green Energy (OSTI)

The concept of relative permeability is the key concept in extending Darcy's law for single phase flow through porous media to the two-phase flow regime. Relative permeability functions are needed for simulation studies of two-phase geothermal reservoirs. These are poorly known inspite of considerable theoretical and experimental investigations during the last decade. Since no conclusive results exist, many investigators use ad hoc parametrization, or adopt results obtined from flow of oil and gas (Corey, 1954). It has been shown by Reda and Eaton (1980) that this can lead to serious deficiencies. Sensitivity of the relative permeability curves for prediction of mass flow rate and flowing enthalpy into geothermal wells has been studied by many investigators (e.g. Eaton and Reda (1980), Bodvarsson et al (1980), Sun and Ershagi (1979) etc.). It can be concluded from these studies that the beehavior of a two-phase steam/water reservoir depends greatly on the relative permeability curves used. Hence, there exists a need for obtaining reliable relative permeability functions.

Verma, Ashok K.; Pruess, Karsten; Bodvarsson, G.S.; Tsang, C.F.; Witherspoon, Paul A.

1983-12-15T23:59:59.000Z

394

Development and testing of the Minimum Additive Waste Stabilization (MAWS) system for Fernald wastes. Phase 1, Final report  

Science Conference Proceedings (OSTI)

This report presents results of a treatability study for the evaluation of the MAWS process for wastes stored at the Fernald Environmental Management Project (FEMP) site. Wastes included in the study were FEMP Pit 5 sludges, soil-wash fractions, and ion exchange media from a water treatment system supporting a soil washing system. MAWS offers potential for treating a variety of waste streams to produce a more leach resistant waste form at a lower cost than, say, cement stabilization.

Fu, S.S.; Matlack, K.S.; Mohr, R.K.; Brandys, M. Hojaji, H.; Bennett, S.; Ruller, J.; Pegg, I.L. [GTS Duratek, Columbia, MD (United States)

1994-12-01T23:59:59.000Z

395

How green was my electricity? : designing incentives to co-optimize waste management and energy development in New England  

E-Print Network (OSTI)

Waste management is a complex issue, often out of sight and mind, but with the potential for significant negative environmental, social, and economic impacts. Electricity resource planning is equally complex and can ...

Larsen, Walker (Walker Andrew)

2008-01-01T23:59:59.000Z

396

Encouraging low-impact-development stormwater-management practices / Assabet River Watershed sub-basin case study  

E-Print Network (OSTI)

Regulatory codes and ordinances create a framework that guide stormwater management decision processes. These regulations are designed to protect the health and safety of the public and to preserve the natural integrity ...

Brown, James E. (James Edward), 1969-

2005-01-01T23:59:59.000Z

397

Property Management | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Management Property Management Personal Property Management and Accountability for Headquarters Management Personal property management includes all functions necessary for the proper determination of need, source, acquisition, receipt, accountability, utilization, maintenance, rehabilitation, storage, distribution and disposal of property. Authorized Property Representatives Effective October 2, 2013: Authorized Property Pass Signers List and Accountable Property Representatives List Personal Property Guidance Personal property management requires a lifecycle approach to be effective. There are four major phases in the personal property lifecycle: acquisition, receipt, utilization, and disposal. Each phase has distinct processes and procedures associated with it to maintain proper stewardship

398

The Development of a Coordinated Database for Water Resources and Flow Model in the Paso Del Norte Watershed (Phase III) Part III GIS Coverage for the Valle de Juárez Irrigation District 009 (ID-009) (Distrito de Riego 009) Chihuahua, México  

E-Print Network (OSTI)

This report fulfills the deliverables required by the cooperative agreement between the U.S. Army Corps of Engineers and Texas Agricultural Experiment Station (TAES/03-PL- 02: Modification No. 3) on behalf of the Paso del Norte Watershed Council. Tasks accomplished in this phase include (a) assessment of data availability for expansion of the URGWOM model, identification of data gaps, generation of data needed from historic data using empirical methods, compilation and verification of the water quality data for reaches between the Elephant Butte Reservoir, New Mexico and Fort Quitman, Texas; (b) development of the RiverWare physical model for the Rio Grande flow for the selected reaches between Elephant Butte Reservoir and El Paso, beginning with a conceptual model for interaction of surface water and groundwater in the Rincon and Mesilla valleys, and within the limits of available data; and (c) implementation of data transfer interface between the coordinated database and hydrologic models. This Project was conducted by researchers at Texas A&M University (TAMU) and New Mexico State University (NMSU) under the direction of Zhuping Sheng of TAMU and J. Phillip King of New Mexico State University. It was developed to enhance the coordinated database, which was originally developed by the Paso del Norte Watershed Council with support of El Paso Water Utilities to fulfill needs for better management of regional water resources and to expand the Upper Rio Grande Water Operations Model (URGWOM) to cover the river reaches between Elephant Butte Dam, New Mexico and Fort Quitman, Texas. In Phases I and II of this Project (TAES/03-PL-02), hydrological data needed for flow model development were compiled and data gaps were identified and a conceptual model developed. The objectives of this phase were to develop a physical model of the Rio Grande flow between Elephant Butte Dam and American Dam by using data collected in the first development phase of the PdNWC/Corps Coordinated Water Resources Database and to enhance the data portal capabilities of the PdNWC Coordinated Database Project. This report is Part III of a three part completion report for Phase III and provides information on water sources, uses, and GIS of the canals and ditches of the Valle de Juárez Irrigation District 009 (ID 009) in the Juárez Lower Valley, Chihuahua, México. The author explains that the water needs of this region have changed in recent years from being primarily for agricultural purposes to domestic and industrial uses currently. Also, the United States wanted to assess and identify new data sources on a GIS format for the Mexican side. Therefore, this project produced several maps with the location of channels and ditches along the Valle de Juárez Irrigation District. This information also will support water planning of the Valle de Juárez Irrigation District 009. The maps were produced from existing digital data regarding water resources and by adding thematic layers such as soil salinity and soil texture from analog maps. ASTER satellite imagery and official panchromatic aerial photography were used to produce the maps.

Granados, Alfredo; Srinivasan, Raghavan; Sheng, Zhuping; King, J. Phillip; Creel, Bobby; Brown, Christopher; Michelsen, Ari

2009-01-01T23:59:59.000Z

399

Journal of Light Emitting Diodes Vol 2 N0 1, April 2010 1 Abstract--In metal organic vapor phase epitaxy we developed  

E-Print Network (OSTI)

Journal of Light Emitting Diodes Vol 2 N0 1, April 2010 1 Abstract-- In metal organic vapor phase epitaxy we developed GaInN/GaN quantum well material suitable for 500 ­ 580 nm light emitting diodes at longer wavelengths. Index Terms-- a-plane GaN, GaInN, Green light emitting diode, m-plane GaN I

Wetzel, Christian M.

400

Management Solution  

E-Print Network (OSTI)

MEMO: Request for proposal for Computer-Aided Facilities and Maintenance Management application software; professional services; development services for interfaces to Financial Management and Human Resources systems; configuration, test, train, maintenance and support services to implement and maintain a CAFM Solution for the California Administrative Office of the Courts, the Trial Courts, the Appellate Courts and the Judicial Council, known as “The AOC Group.” You are invited to review and respond to the attached Request for Proposal (“RFP”):

Rfp Number Isdcafm

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "manager development phases" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Silicon solar cell process development, fabrication and analysis. Phase II. Annual report, 1 July 1979-30 June 1980  

DOE Green Energy (OSTI)

Solar cells were fabricated from EFG (RH) ribbons from multiple dies, silicon on ceramic (SOC), dendritic web, cast silicon by HEM, and semi-continuous CZ from both VARIAN and HAMCO. Baseline and improved solar cells were made from the sheets. Baseline solar cells processed in both Phase I and Phase II, involving cells from EFG, SOC, dendritic web, and HEM, indicated that no significant improvement in silicon sheet quality has been achieved in Phase II. Solar cells from semi-continuous CZ showed cell performance close to the conventional CZ control cells, although the cells from the semi-continuous CZ have shown wider performance range because of variation in crystalline perfection. Generally, process upgrading provided improvement in cell performance, the improvement depending on the process used and the quality of the sheet silicon. Study of the effect of grain size on solar cell performance suggested that the minimum grain size to make solar cells of 10% AMO efficiency is about 500 ..mu..m, which is expected to provide minimum module efficiency of 10% AMI. If other harmful impurities are added in the process of sheet growth, the minimum grain size must be increased. The BSF study showed that the higher the resistivity of the starting substrates, the greater the relative improvement in cell performance, probably because of greater shift in Fermi levels at the back L/H junction (pp+) and also because of the higher initial values of minority carrier diffusion length. This study also suggested that proper control of the back-surface field (BSF) process could minimize the junction shunting problems often introduced by the BSF processing.

Yoo, H.I.; Iles, P.A.; Ho, F.F.; Leung, D.C.

1980-01-01T23:59:59.000Z

402

DEVELOPMENT OF AN EXPERT SYSTEM TO IDENTIFY PHASE EQUILIBRIA AND ENHANCED OIL RECOVERY CHARACTERISTICS OF CRUDE OILS.  

E-Print Network (OSTI)

??With the increasing demand of oil and gas in the past decades, great endeavors in the oil industry have been devoted to develop and incorporate… (more)

Hua, Luoyi

2012-01-01T23:59:59.000Z

403

Report on phase I on the development of improved seals and bearings for downhole drilling motors. Final report  

DOE Green Energy (OSTI)

New bearing and seal designs are outlined, as well as the progress made on developing test facilities for full-size bearing and seal assemblies. (MHR)

Black, A.D.; Green, S.J.; Matson, L.W.; Maurer, W.C.; Nielsen, R.R.; Nixon, J.D.; Wilson, J.G.

1977-05-01T23:59:59.000Z

404

Facilities management: the development of a model for building condition assessment surveys conducted at Fort Riley, Kansas  

E-Print Network (OSTI)

The purpose of this study is to document the research and design of a condition assessment system for buildings by utilizing case study methods for the facilities located at Fort Riley, Kansas, an Army military installation. The design of the assessment or auditing system incorporates the following procedures: (1) identification of building components, (2) identification of building sub-components, (3) utilization of decision-tree logic diagrams to manage the information, and (4) production of inspection condition criteria and scoring for each sub-component (by visual inspection techniques) . The system was used by multiple inspectors to assess the buildings at Fort Riley. The inspectors received training in the system scoring and methodology. To verify the system's accuracy, ten percent (10%) of the buildings were re-inspected by the developers of the system (quality control) . The analysis of the system included a random sample of 20 buildings from the data collected. The data were analyzed for accuracy and consistency on the component and sub-component recognition and the inspection condition score (as compared to the quality control results) The actual inspection time was monitored to record the inspection efficiency. Statistical testing was conducted which did the following: (1) analyzed the data pair means for any significant differences, and (2) analyzed the strength of the pair relationships. From the data analysis the following was found: (1) the components and sub-components were recognized accurately and consistently, (2) the actual scores seemed to be accurate and consistent (after conducting the statistical test (T-Test) some of the means did indicate that there were some significant differences, while others indicated there were no significant differences) , (3) the data indicated that there was correlation between the data pairs. Also, it was found that this system provides reasonable inspection time and cost restraints. The building assessments are incorporated into an information system that assists the user in establishing priorities. The cost factors for each sub-component are based on building models that relate the quantities of the different sub-components to the actual floor area of the buildings. From these building models conceptual estimates can be generated and used as a tool to budget, justify, and anticipate maintenance and repair costs.

Riblett, Carl Olin

1993-01-01T23:59:59.000Z

405

Ford/ERDA sodium--sulfur battery development, Phase II. Progress report No. 22, July 1--July 31, 1977  

DOE Green Energy (OSTI)

Specific results in the areas of container and seal development, development of ceramic electrolyte and seal technology, and cell fabrication and testing are reported. Mo foil withstood corrosion by polysulfides at 400/sup 0/C well. Thermal expansion and elasticity coefficients were determined for ..beta..''-alumina. Capacity yields and life characteristics are tabulated. 1 figure, 6 tables. (RWR)

Topouzian, A.

1977-08-01T23:59:59.000Z

406

Rural Development Department (RDV) The World Bank Integrated Nutrient Management Smallholders Generally Lack Adequate Nutrients for their Crops  

E-Print Network (OSTI)

Nutrients are essential for plant growth, but on smallholders ’ farms, an inadequate supply is a key impediment to sustainable food production. Integrated nutrient management (INM) utilizes available organic and inorganic nutrients to build ecologically sound and economically viable farming systems. INM optimizes all aspects of nutrient cycling — supply, uptake, and loss to the environment — to improve food production. This Note describes interventions that may be applied to a range of agroecological zones, cropping systems, and soil types. The interventions address a few key aspects of nutrient management, including improving organic matter in the soil, increasing plant-available nitrogen, and supplying both organic and inorganic fertilizers. These interventions have the

unknown authors

1999-01-01T23:59:59.000Z

407

Ground Water Management Regulations (Louisiana) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground Water Management Regulations (Louisiana) Ground Water Management Regulations (Louisiana) Eligibility Agricultural Construction Developer Fuel Distributor Industrial...

408

Dynamic light scattering study on phase separation of a protein-water mixture: Application on cold cataract development in the ocular lens  

E-Print Network (OSTI)

We present a detailed dynamic light scattering study on the phase separation in the ocular lens emerging during cold cataract development. Cold cataract is a phase separation effect that proceeds via spinodal decomposition of the lens cytoplasm with cooling. Intensity auto-correlation functions of the lens protein content are analyzed with the aid of two methods providing information on the populations and dynamics of the scattering elements associated with cold cataract. It is found that the temperature dependence of many measurable parameters changes appreciably at the characteristic temperature ~16+1 oC which is associated with the onset of cold cataract. Extending the temperature range of this work to previously inaccessible regimes, i.e. well below the phase separation or coexistence curve at Tcc, we have been able to accurately determine the temperature dependence of the collective and self-diffusion coefficient of proteins near the spinodal. The analysis showed that the dynamics of proteins bears some resemblance to the dynamics of structural glasses where the apparent activation energy for particle diffusion increases below Tcc indicating a highly cooperative motion. Application of ideas developed for studying the critical dynamics of binary protein/solvent mixtures, as well as the use of a modified Arrhenius equation, enabled us to estimate the spinodal temperature Tsp of the lens nucleus. The applicability of dynamic light scattering as a non-invasive, early-diagnostic tool for ocular diseases is also demonstrated in the light of the findings of the present paper.

V. Petta; N. Pharmakakis; G. N. Papatheodorou; S. N. Yannopoulos

2008-06-11T23:59:59.000Z

409

FORSITE, a multiple-project management system: production of critical-path development schedules for geothermal electric-power-generation projects  

DOE Green Energy (OSTI)

FORSITE is an advanced project monitoring software system that is designed to track and forecast the development of multiple projects. This paper describes the organization and operation of the FORSITE system including its overall structure and the functional relationships between its files and data bases. The paper also illustrates the operation of the system with an example of a generic critical-path management schedule produced by FORSITE. A program listing and schedule summaries are included as appendices.

Bernstein, A.J.; Entingh, D.J.; Gerstein, R.E.; Gould, A.V.

1982-10-01T23:59:59.000Z

410

Time frames for geothermal project development  

DOE Green Energy (OSTI)

Geothermal development can generally be broken down into distinct phases: Exploration and Leasing; Project Development And Feasibility Studies; Well Field Development; Project Finance, Construction and Start-up Operations; and Commercial Operations. Each phase represents different levels of cost and risk and different types of management teams that are needed to assess and manage the project and associated risk. Orderly transitions of management at each major phase are needed. Exploration programs are largely science based, the primary focus of the science based investigations should be to: secure the lease position, and develop sufficient information to identify and characterize an economical geothermal resource. Project development specialists build on the exploration data to: pull together a project design, develop a detailed cost estimate; prepare an environmental assessment; and collect all data needed for project financing. Construction specialist build from the development phase to: develop detailed engineering, procure equipment and materials, schedule and manage the facilities construction programs, and start and test the power plant. Operations specialists take over from construction during start-up and are responsible for sustainable and reliable operations of the resource and power generation equipment over the life of the project.

McClain, David W.

2001-04-17T23:59:59.000Z

411

New urbanism on a grand scale : the challenges for large-scale, multi-phase master planned developments  

E-Print Network (OSTI)

New Urbanism has been described as an urban design movement promoting the master planning and development of communities that have walkable, human-scale neighborhoods while integrating the necessary elements of modern life ...

Olchowicz, Edward J

2011-01-01T23:59:59.000Z

412

Low Wind Speed Technology Phase II: Development of an Operations and Maintenance Cost Model for LWST; Global Energy Concepts  

SciTech Connect

This fact sheet describes a subcontract with Global Energy Concepts to evaluate real-world data on O&M costs and to develop a working model to describe these costs for low wind speed sites.

Not Available

2006-03-01T23:59:59.000Z

413

The (safety-related) heat exchangers aging management guideline for commercial nuclear power plants, and developments since 1994  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE), in cooperation with the Electric Power Research Institute (EPRI) and US nuclear power plant utilities, is preparing a series of aging management guidelines (AMGs) for commodity types of components (e.g., heat exchangers, electrical cable and terminations, pumps). Commodities are included in this series based on their importance to continued nuclear plant operation and license renewal. The AMGs contain a detailed summary of operating history, stressors, aging mechanisms, and various types of maintenance and surveillance practices that can be combined to create an effective aging management program. Each AMG is intended for use by the systems engineers and plant maintenance staff (i.e., an AMG is intended to be a hands-on technical document rather than a licensing document). The heat exchangers AMG, published in June 1994, includes the following information of interest to nondestructive examination (NDE) personnel: aging mechanisms determined to be non-significant for all applications; aging mechanisms determined to be significant for some applications; effective conventional programs for managing aging; and effective unconventional programs for managing aging. Since the AMG on heat exchangers was published four years ago, a brief review has been conducted to identify emerging regulatory issues, if any. The results of this review and lessons learned from the collective set of AMGs are presented.

Clauss, J.M.

1998-08-01T23:59:59.000Z

414

Development of a methodology for defining whole-building energy design targets for commercial buildings: Phase 2, Development Concept Stage Report  

SciTech Connect

The primary focus of the Whole-Building Energy Design Targets project is to develop a flexible methodology for setting target guidelines with which to assess energy efficiency in commercial building design. The proposed methodology has several innovative features. In this report, the authors document their work to define the software development concepts upon which the overall Targets methodology will be based. Three task reports are included here. Development of the user interface--that critical connection through which the human end-user (architect, engineer, planner, owner) will apply the methodology--is described in Section 2. In Section 3, the use of the software engineering process in Targets model development efforts is described. Section 4 provides details on the data and system integration task, in which interactions between and among all the major components, termed modules, of the Targets model were examined to determine how to put them together to create a methodology that is effective and easy to use. 4 refs., 26 figs.

Deringer, J.J. (American Inst. of Architects, Washington, DC (USA)); Hall, J.D. (Deringer Group, Riva, MD (USA)); Jones, J.W. (American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc., New York, NY (USA)); McKay, H.N. (Illuminating Engineering Society of North America, New York, NY (USA)); Alley, P.K. (Pacific Northwest Lab., Richland, WA (USA))

1990-09-01T23:59:59.000Z

415

Computerized training management system  

DOE Patents (OSTI)

A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

1998-08-04T23:59:59.000Z

416

Computerized training management system  

DOE Patents (OSTI)

A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

Rice, Harold B. (Franklin Furnace, OH); McNair, Robert C. (East Setauket, NY); White, Kenneth (Shirley, NY); Maugeri, Terry (Wading River, NY)

1998-08-04T23:59:59.000Z

417

Development of a methodology for defining whole-building energy design targets for commercial buildings: Phase 2, Development Concept Stage Report  

Science Conference Proceedings (OSTI)

This report documents eight tasks performed as part of the Whole-Building Energy Design Targets project, in which detailed conceptual approaches were produced for each element of the proposed Targets model. The eight task reports together describe the important modules proposed for inclusion in the Targets model: input module, energy module, characteristic development moduel, building cost module, analysis control module, energy cost module, search routines module, and economic analysis module. 16 refs., 16 figs., 5 tabs.

McKay, H.N. (Illuminating Engineering Society of North America, New York, NY (USA)); Deringer, J.J. (American Inst. of Architects, Washington, DC (USA)); Jones, J.W. (American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc., Atlanta, GA (USA)); Hall, J.D. (Deringer Group, Riva, MD (USA))

1990-09-01T23:59:59.000Z

418

Spent fuel management fee methodology and computer code user's manual.  

Science Conference Proceedings (OSTI)

The methodology and computer model described here were developed to analyze the cash flows for the federal government taking title to and managing spent nuclear fuel. The methodology has been used by the US Department of Energy (DOE) to estimate the spent fuel disposal fee that will provide full cost recovery. Although the methodology was designed to analyze interim storage followed by spent fuel disposal, it could be used to calculate a fee for reprocessing spent fuel and disposing of the waste. The methodology consists of two phases. The first phase estimates government expenditures for spent fuel management. The second phase determines the fees that will result in revenues such that the government attains full cost recovery assuming various revenue collection philosophies. These two phases are discussed in detail in subsequent sections of this report. Each of the two phases constitute a computer module, called SPADE (SPent fuel Analysis and Disposal Economics) and FEAN (FEe ANalysis), respectively.

Engel, R.L.; White, M.K.

1982-01-01T23:59:59.000Z

419

Development of improved processing and evaluation methods for high reliability structural ceramics for advanced heat engine applications Phase II. Final report  

SciTech Connect

The research program had as goals the development and demonstration of significant improvements in processing methods, process controls, and nondestructive evaluation (NDE) which can be commercially implemented to produce high reliability silicon nitride components for advanced heat engine applications at temperatures to 1370{degrees}C. In Phase I of the program a process was developed that resulted in a silicon nitride - 4 w% yttria HIP`ed material (NCX 5102) that displayed unprecedented strength and reliability. An average tensile strength of 1 GPa and a strength distribution following a 3-parameter Weibull distribution were demonstrated by testing several hundred buttonhead tensile specimens. The Phase II program focused on the development of methodology for colloidal consolidation producing green microstructure which minimizes downstream process problems such as drying, shrinkage, cracking, and part distortion during densification. Furthermore, th