National Library of Energy BETA

Sample records for management working group

  1. Energy Management Working Group: Accelerating Energy Management 

    E-Print Network [OSTI]

    Scheihing, P.

    2014-01-01

    of energy management systems (EnMS) in the industrial and commercial building sectors. EnMS can help organizations potentially conserve 10%-40% of their energy use by institutionalizing the policies, procedures and tools to systematically track, analyze...

  2. EFCOG Work Management Sub-Working Group Session on Overview and Results from WP&C Assist Visits across Complex

    Broader source: Energy.gov [DOE]

    Slide Presentation by Donna J. Governor, EFCOG Work Management Subgroup Chair. EFCOG Work Management Subgroup--Introduction and Overview.

  3. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

  4. Interagency Sustainability Working Group: Update Report; December 2009, Federal Energy Management Program (FEMP) (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2009-12-01

    December 2009 update report offered by the Interagency Sustainability Working Group (ISWG). This report is updated bi-annually.

  5. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation.

  6. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  7. Working Group Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricNCubictheThepresented in1: Model or Working Group

  8. Working Group Report: Sensors

    SciTech Connect (OSTI)

    Artuso, M.; et al.,

    2013-10-18

    Sensors play a key role in detecting both charged particles and photons for all three frontiers in Particle Physics. The signals from an individual sensor that can be used include ionization deposited, phonons created, or light emitted from excitations of the material. The individual sensors are then typically arrayed for detection of individual particles or groups of particles. Mounting of new, ever higher performance experiments, often depend on advances in sensors in a range of performance characteristics. These performance metrics can include position resolution for passing particles, time resolution on particles impacting the sensor, and overall rate capabilities. In addition the feasible detector area and cost frequently provides a limit to what can be built and therefore is often another area where improvements are important. Finally, radiation tolerance is becoming a requirement in a broad array of devices. We present a status report on a broad category of sensors, including challenges for the future and work in progress to solve those challenges.

  9. High Temperature Membrane Working Group

    Broader source: Energy.gov [DOE]

    This presentation provides an overview of the High Temperature Membrane Working Group Meeting in May 2007.

  10. Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

    SciTech Connect (OSTI)

    Nutt, M.; Nuclear Engineering Division

    2010-05-25

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.

  11. Water Resources Working Group Report

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Water Resources Working Group Report This report provided content for the Wisconsin Initiative in February 2011. #12;Water Resources Working Group Wisconsin Initiative on Climate Change Impacts October 2010 #12;Water Resources Working Group Members ­ WICCI Tim Asplund (Co-Chair) - Wisconsin Department

  12. TEC Working Group Topic Groups Archives Protocols

    Broader source: Energy.gov [DOE]

    The Transportation Protocols Topic Group serves as an important vehicle for DOE senior managers to assess and incorporate stakeholder input into the protocols process. The Topic Group was formed to review a series of transportation protocols developed in response to a request for DOE to be more consistent in its approach to transportation.

  13. Interagency Sustainability Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainability Working Group Interagency Sustainability Working Group The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable federal...

  14. Interagency Sustainability Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Areas Sustainable Buildings & Campuses Interagency Sustainability Working Group Interagency Sustainability Working Group The Interagency Sustainability Working Group...

  15. Construction work process management 

    E-Print Network [OSTI]

    Soares, Jorge Barbosa

    1994-01-01

    for organizationand project-level work processes. Data to support the analysis were collected through a mailed questionnaire sent to construction executives and managers who were asked to provide information on organizational and project work processes, respectively....

  16. Winter 2014 Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDidDevelopmentatabout Who Works for NIF & PS? TheWindows, Doors,

  17. Mixed Waste Working Group report

    SciTech Connect (OSTI)

    Not Available

    1993-11-09

    The treatment of mixed waste remains one of this country`s most vexing environmental problems. Mixed waste is the combination of radioactive waste and hazardous waste, as defined by the Resource Conservation and Recovery Act (RCRA). The Department of Energy (DOE), as the country`s largest mixed waste generator, responsible for 95 percent of the Nation`s mixed waste volume, is now required to address a strict set of milestones under the Federal Facility Compliance Act of 1992. DOE`s earlier failure to adequately address the storage and treatment issues associated with mixed waste has led to a significant backlog of temporarily stored waste, significant quantities of buried waste, limited permanent disposal options, and inadequate treatment solutions. Between May and November of 1993, the Mixed Waste Working Group brought together stakeholders from around the Nation. Scientists, citizens, entrepreneurs, and bureaucrats convened in a series of forums to chart a course for accelerated testing of innovative mixed waste technologies. For the first time, a wide range of stakeholders were asked to examine new technologies that, if given the chance to be tested and evaluated, offer the prospect for better, safer, cheaper, and faster solutions to the mixed waste problem. In a matter of months, the Working Group has managed to bridge a gap between science and perception, engineer and citizen, and has developed a shared program for testing new technologies.

  18. Ad Hoc Curriculum Implementation Working Group Ad Hoc Working Group

    E-Print Network [OSTI]

    Brown, Sally

    Ad Hoc Curriculum Implementation Working Group MINUTES Ad Hoc Working Group 4 December 2002 Friedman on her visit next week. ONE CURRICULUM OR TWO? Information presented by Trudeau shows that PSE and other programs cannot be merged into a single curriculum. The Faculty Senate website states

  19. Federal Utility Partnership Working Group Meeting: Washington...

    Energy Savers [EERE]

    Utility Partnership Working Group Meeting: Washington Update Federal Utility Partnership Working Group Meeting: Washington Update Federal Utility Partnership Working Group Meeting:...

  20. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Annual Report 1999 prepared by: Data Management Group Joint Program APPENDIX A: DATA REQUESTS ..................................... 11 #12;Data Management Group 1999 Annual Report Page 1 of 14 INTRODUCTION The Data Management Group is a research project located at the Joint

  1. TEC Working Group Topic Groups Tribal

    Broader source: Energy.gov [DOE]

    The Tribal Topic Group was established in January 1998 to address government-to-government consultation between DOE and Indian Tribes affected by its transportation activities. The group focuses on...

  2. Federal Utility Partnership Working Group Meeting: Washington...

    Energy Savers [EERE]

    Federal Utility Partnership Working Group Meeting: Washington Update Federal Utility Partnership Working Group Meeting: Washington Update Presentation-given at the Fall 2012...

  3. TEC Working Group Topic Groups Archives Protocols Meeting Summaries...

    Office of Environmental Management (EM)

    Working Group Topic Groups Archives Protocols Meeting Summaries Meeting Summaries Philadelphia TEC Meeting, Protocols Topic Group Summary - July 1999 Jacksonville TEC Meeting,...

  4. TEC Working Group Topic Groups Archives Communications

    Broader source: Energy.gov [DOE]

    The Communications Topic Group was convened in April 1998 to improve internal and external strategic level communications regarding DOE shipments of radioactive and other hazardous materials.

  5. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Annual Report 2000 prepared by: Data Management Group Joint Program PROCESSING ...................................................2 Text Based Data Retrieval System `drs'.................................2 Internet Browser Data Retrieval System (iDRS).....................3 Complex Data Requests

  6. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    iv Data Management Group Annual Report 2003 City of Hamilton City of Toronto GO Transit Regional of York Toronto Transit Commission The Data Management Group is a research program located ........................................................................................................ 3 Text-based Data Retrieval System `drs

  7. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Annual Report 2001 prepared by: Data Management Group Joint Program..............................................................................2 Text Based Data Retrieval System `drs' ..........................................................2 Internet Browser Data Retrieval System (iDRS)..............................................3 Complex Data

  8. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Annual Report 2002 prepared by: Data Management Group Joint Program Based Data Retrieval System `drs' ............................................... 3 Internet Browser Data Retrieval System (iDRS) .................................. 4 Complex Data Requests

  9. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Annual Report 1997 #12;Data Management Group Annual Report 1997 A co-operative project that is jointly funded by members of the Toronto Area Transportation Planning Data Collection: (416) 978-3941 #12;Data Management Group 1997 Annual Report Table of Contents 1 INTRODUCTION

  10. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Annual Report 2004 City of Hamilton City of Toronto GO Transit Regional of York Toronto Transit Commission The Data Management Group is a research program located of the funding partners: Ministry of Transportation, Ontario #12;SUMMARY The Data Management Group (DMG

  11. Data Management Group Annual Report

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Annual Report 2000 prepared by: Data Management Group Joint Program ...........................................18 #12;i SUMMARY The Data Management Group (DMG), in cooperation with the funding agencies, has. In addition, there were 26 complex requests for data that required a customized computer program. Eight

  12. Exascale Hardware Architectures Working Group

    SciTech Connect (OSTI)

    Hemmert, S; Ang, J; Chiang, P; Carnes, B; Doerfler, D; Leininger, M; Dosanjh, S; Fields, P; Koch, K; Laros, J; Noe, J; Quinn, T; Torrellas, J; Vetter, J; Wampler, C; White, A

    2011-03-15

    The ASC Exascale Hardware Architecture working group is challenged to provide input on the following areas impacting the future use and usability of potential exascale computer systems: processor, memory, and interconnect architectures, as well as the power and resilience of these systems. Going forward, there are many challenging issues that will need to be addressed. First, power constraints in processor technologies will lead to steady increases in parallelism within a socket. Additionally, all cores may not be fully independent nor fully general purpose. Second, there is a clear trend toward less balanced machines, in terms of compute capability compared to memory and interconnect performance. In order to mitigate the memory issues, memory technologies will introduce 3D stacking, eventually moving on-socket and likely on-die, providing greatly increased bandwidth but unfortunately also likely providing smaller memory capacity per core. Off-socket memory, possibly in the form of non-volatile memory, will create a complex memory hierarchy. Third, communication energy will dominate the energy required to compute, such that interconnect power and bandwidth will have a significant impact. All of the above changes are driven by the need for greatly increased energy efficiency, as current technology will prove unsuitable for exascale, due to unsustainable power requirements of such a system. These changes will have the most significant impact on programming models and algorithms, but they will be felt across all layers of the machine. There is clear need to engage all ASC working groups in planning for how to deal with technological changes of this magnitude. The primary function of the Hardware Architecture Working Group is to facilitate codesign with hardware vendors to ensure future exascale platforms are capable of efficiently supporting the ASC applications, which in turn need to meet the mission needs of the NNSA Stockpile Stewardship Program. This issue is relatively immediate, as there is only a small window of opportunity to influence hardware design for 2018 machines. Given the short timeline a firm co-design methodology with vendors is of prime importance.

  13. TEC Working Group Topic Groups Manual Review

    Broader source: Energy.gov [DOE]

    This group is responsible for the update of DOE Manual 460.2-1, Radioactive Material Transportation Practices Manual.  This manual was issued on September 23, 2002, and establishes a set of...

  14. A Group Contingency Plus Self-Management Intervention Targeting At-Risk Secondary Students' Class-work and Active Responding

    E-Print Network [OSTI]

    Maack, Sylvia

    2011-12-31

    . Procedural Fidelity Checklist ...........................................................................136 Figure 1. TWW Scores for Second Hour Ashley, Melanie, and Dustin.....................................53 Figure 2. TWW Scores for Second Hour Kelly... classroom management techniques because they efficiently and simultaneously address many students’ behaviors (Cashwell, Skinner, & Smith 2001; Embry, 2002; Kamps & Tankersley, 1996; Theodore, Bray, Kehle, & Jensen, 2001; Thorne & Kamps, 2008...

  15. TEC Working Group Topic Groups Archives Communications Conference...

    Office of Environmental Management (EM)

    Communications Conference Call Summaries TEC Working Group Topic Groups Archives Communications Conference Call Summaries Conference Call Summaries Conference Call Summary April...

  16. TEC Working Group Topic Groups Routing Conference Call Summaries...

    Office of Environmental Management (EM)

    Routing Conference Call Summaries TEC Working Group Topic Groups Routing Conference Call Summaries CONFERENCE CALL SUMMARIES January 31, 2008 December 6, 2007 October 4, 2007...

  17. TEC Working Group Topic Groups Security Conference Call Summaries...

    Office of Environmental Management (EM)

    Conference Call Summaries TEC Working Group Topic Groups Security Conference Call Summaries Conference Call Summaries August 17, 2006 (Draft) July 18, 2006 (Draft) June 20, 2006...

  18. TEC Working Group Topic Groups Archives Mechanics of Funding...

    Office of Environmental Management (EM)

    Mechanics of Funding and Techical Assistance TEC Working Group Topic Groups Archives Mechanics of Funding and Techical Assistance Mechanics of Funding and Techical Assistance Items...

  19. TEC Working Group Topic Groups Routing | Department of Energy

    Office of Environmental Management (EM)

    group members will be to provide stakeholder perspectives and input to the Office of Logistics Management (OLM) in the Department of Energy's (DOE) Office of Civilian Radioactive...

  20. Catalysis Working Group Meeting: January 2015

    Broader source: Energy.gov [DOE]

    Agenda and presentations from the Catalysis Working Group meeting held January 21, 2015, in Los Alamos, New Mexico.

  1. Agenda: High Temperature Membrane Working Group Meeting

    Broader source: Energy.gov [DOE]

    Agenda for the High Temperature Membrane Working Group (HTMWG) meeting on May 18, 2009, in Arlington, Virginia

  2. Catalysis Working Group Meeting: June 2015

    Broader source: Energy.gov [DOE]

    Agenda and presentations from the Catalysis Working Group meeting held on June 8, 2015, in Arlington, Virginia.

  3. ARM Aerosol Working Group Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsicloudden Documentation Data Management Facility PlotsProducts (VAP) VAP Update1Report

  4. ARM Aerosol Working Group Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsicloudden Documentation Data Management Facility PlotsProducts (VAP) VAP Update1Report

  5. ARM Aerosol Working Group Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsicloudden Documentation Data Management Facility PlotsProducts (VAP) VAP Update1Reportof

  6. Hadron Colliders Working Group Report

    SciTech Connect (OSTI)

    S. Peggs and M.J. Syphers

    2001-11-08

    The ''point design'' studied this year shows that a staged VLHC (40, {approx} 200 TeV) is feasible, with no insurmountable challenges. Further work can provide a more optimized design, by studying various alternative field strengths (e.g., superferric magnets for Stage 1) for improvements to vacuum, wall impedance, and other major performance parameters. It may be that a ''single-stage'' scenario for accessing higher energies sooner is the correct approach. A next-step design study should be considered to look at the two cases near to and complementary to the 2001 VLHC Design Study. The effectiveness of photon stops and their engineering design need to be addressed in the near future to truly determine if these devices can lead this effort to even higher luminosities and energies. The superbunch approach should continue to be studied, as well as IR designs, new instrumentation and diagnostics, and beam dynamics issues. Finally, a well organized VLHC-motivated beam studies effort should become part of the national program.

  7. ASRAC MREF Working Group Notice of Intent

    Broader source: Energy.gov (indexed) [DOE]

    rulemaking process, and instead explore openly with other parties all ideas that may emerge from the working group's discussions. E. Facilitator The facilitator will act as a...

  8. Federal Utility Partnership Working Group - Utility Interconnection...

    Energy Savers [EERE]

    Federal Utility Partnership Working Group (FUPWG) meeting-discusses solarphotovoltaic (PV) projects to connect with utility in California and their issues. fupwgfall12jewell.pd...

  9. Fusion Technology Working Group Presented by

    E-Print Network [OSTI]

    California at Los Angeles, University of

    Snowmass Fusion Technology Working Group Summary Presented by M. Abdou, S. Milora Snowmass July 23, 1999 #12;Technology Working Group Subgroup # 1 Subgroup # 2 Solid Walls Ulrickson / Mattas Liquid Walls / Ying Chamber Technology Abdou / Ulrickson Heating/CD/Fueling Swain / Temkin Magnets Schultz / Woolley

  10. Working Group 4 April 25 -30 2000

    E-Print Network [OSTI]

    DIS2000 Working Group 4 April 25 - 30 2000 Liverpool, UK Di#11;ractive D #3;#6; (2010) Production Selection #15; Results from ZEUS and H1 #15; Conclusions #12; DIS2000 | Working Group 4 Jo Cole Why measure states, eg. J= #15; Study of charm provides test of under- lying dynamics of di#11;raction April 2000 2

  11. TEC Working Group Topic Groups Archives Consolidated Grant Topic Group

    Broader source: Energy.gov [DOE]

    The Consolidated Grant Topic Group arose from recommendations provided by the TEC and other external parties to the DOE Senior Executive Transportation Forum in July 1998. It was proposed that the consolidation of multiple funding streams from numerous DOE sources into a single grant would provide a more equitable and efficient means of assistance to States and Tribes affected by DOE nuclear material shipments.

  12. RISK ASSESSMENT TECHNICAL EXPERT WORKING GROUP

    Broader source: Energy.gov [DOE]

    The Risk Assessment Technical Expert Working Group (RWG) is established to assist the Department of Energy (DOE) with the appropriate and effective use of quantitative risk assessment in nuclear...

  13. W Boson Mass Working Group Report

    SciTech Connect (OSTI)

    Kilgore, W.; Kilgore, W.

    2010-06-14

    The W boson mass working group discussed the current status of the W boson mass measurement and the prospects for improving on LEP and Tevatron measurements at the LHC.

  14. This work utilizes data obtained by the Global Oscillation Network Group (GONG++) Program and the SOI/MDI instrument on SoHO. GONG++ is managed by the National

    E-Print Network [OSTI]

    Braun, Douglas C.

    This work utilizes data obtained by the Global Oscillation Network Group (GONG++) Program and the SOI/MDI instrument on SoHO. GONG++ is managed by the National Solar Observatory, which is operated 3 Stanford University, Stanford, California Both MDI and GONG++ Programs provide daily helioseismic

  15. Faculty of Information's Governance and Organization Structure Work Group Final Report 201505

    E-Print Network [OSTI]

    Toronto, University of

    Faculty of Information's Governance and Organization Structure Work Group Final Report 201505 1 Programs. #12;Faculty of Information's Governance and Organization Structure Work Group Final Report for strategic management in several specialized programs has also emerged: Coop Program and Undergraduate

  16. Design change management in regulation of nuclear fleets: World nuclear association's working groups on Cooperation in Reactor Design Evaluation and Licensing (CORDEL)

    SciTech Connect (OSTI)

    Swinburn, R. [CORDEL DCM Task Force, Rolls-Royce Plc (United Kingdom); Borysova, I. [CORDEL, WNA, 22a St.James Sq., London SW1Y 4JH (United Kingdom); Waddington, J. [CORDEL Group (United Kingdom); Head, J. G. [CORDEL Group, GE-Hitachi Nuclear Energy (United Kingdom); Raidis, Z. [CORDEL Group, Candu Energy (United Kingdom)

    2012-07-01

    The 60 year life of a reactor means that a plant will undergo change during its life. To ensure continuing safety, changes must be made with a full understanding of the design intent. With this aim, regulators require that each operating organisation should have a formally designated entity responsible for complete design knowledge in regard to plant safety. INSAG-19 calls such an entity 'Design Authority'. This requirement is difficult to achieve, especially as the number of countries and utilities operating plants increases. Some of these operating organisations will be new, and some will be small. For Gen III plants sold on a turnkey basis, it is even more challenging for the operating company to develop and retain the full knowledge needed for this role. CORDEL's Task Force entitled 'Design Change Management' is investigating options for effective design change management with the aim to support design standardization throughout a fleet's lifetime by means of enhanced international cooperation within industry and regulators. This paper starts with considering the causes of design change and identifies reasons for the increased beneficial involvement of the plant's original vendor in the design change process. A key central theme running through the paper is the definition of responsibilities for design change. Various existing mechanisms of vendor-operator interfaces over design change and how they are managed in different organisational and regulatory environments around the world are considered, with the functionality of Owners Groups and Design Authority being central. The roles played in the design change process by vendors, utilities, regulators, owners' groups and other organisations such as WANO are considered The aerospace industry approach to Design Authority has been assessed to consider what lessons might be learned. (authors)

  17. Group Work: Global warming & natural variability

    E-Print Network [OSTI]

    Allan, Richard P.

    Group Work: Global warming & natural variability Left: Global annual temperature departure from://skepticalscience.com/foster-and-rahmstorf-measure-global-warming-signal.html 2013 2012 2011 #12;: 1963-1964, 1982-83, 1991-93 1. How do these events affect the global annual temperature and can you

  18. Working group on $??$ and $?$N interactions - Summary

    E-Print Network [OSTI]

    Ulf-G. Meißner; Martin Sevior; A. Badertscher; B. Borasoy; P. Büttiker; G. Höhler; M. Knecht; O. Krehl; J. Lowe; M. Mojzis; G. Müller; O. Patarakin; M. Pavan; A. Rusetsky; M. E. Sainio; J. Schacher; G. Smith; S. Steininger; V. Vereshagin

    1997-11-18

    This is the summary of the working group on $\\pi\\pi$ and $\\pi$N interactions of the Chiral Dynamics Workshop in Mainz, September 1-5, 1997. Each talk is represented by an extended one page abstract. Some additional remarks by the convenors are added

  19. Opto Working Group Meeting March 21, 2014

    E-Print Network [OSTI]

    Gan, K. K.

    Summary of failures after burn-in/thermal cycles Summary K.K. Gan #12;K.K. Gan Opto Working Group Implemented several improvements based on experience gained from production of 1st generation opto cold solder is a major cause of opto-link failures opto-boards built by OSU have ~0.1% broken

  20. Spent Fuel Working Group Report. Volume 1

    SciTech Connect (OSTI)

    O`Toole, T.

    1993-11-01

    The Department of Energy is storing large amounts of spent nuclear fuel and other reactor irradiated nuclear materials (herein referred to as RINM). In the past, the Department reprocessed RINM to recover plutonium, tritium, and other isotopes. However, the Department has ceased or is phasing out reprocessing operations. As a consequence, Department facilities designed, constructed, and operated to store RINM for relatively short periods of time now store RINM, pending decisions on the disposition of these materials. The extended use of the facilities, combined with their known degradation and that of their stored materials, has led to uncertainties about safety. To ensure that extended storage is safe (i.e., that protection exists for workers, the public, and the environment), the conditions of these storage facilities had to be assessed. The compelling need for such an assessment led to the Secretary`s initiative on spent fuel, which is the subject of this report. This report comprises three volumes: Volume I; Summary Results of the Spent Fuel Working Group Evaluation; Volume II, Working Group Assessment Team Reports and Protocol; Volume III; Operating Contractor Site Team Reports. This volume presents the overall results of the Working Group`s Evaluation. The group assessed 66 facilities spread across 11 sites. It identified: (1) facilities that should be considered for priority attention. (2) programmatic issues to be considered in decision making about interim storage plans and (3) specific vulnerabilities for some of these facilities.

  1. September 2012, Work Force Retention Work Group Status Overview

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to theDepartmentWork Force Retention Work Group

  2. HEP-FCE Working Group on Libraries and Tools

    E-Print Network [OSTI]

    Borgland, Anders; Kirby, Michael; Patton, Simon; Potekhin, Maxim; Viren, Brett; Yanny, Brian

    2015-01-01

    This is a report from the Libraries and Tools Working Group of the High Energy Physics Forum for Computational Excellence. It presents the vision of the working group for how the HEP software community may organize and be supported in order to more efficiently share and develop common software libraries and tools across the world's diverse set of HEP experiments. It gives prioritized recommendations for achieving this goal and provides a survey of a select number of areas in the current HEP software library and tools landscape. The survey identifies aspects which support this goal and areas with opportunities for improvements. The survey covers event processing software frameworks, software development, data management, workflow and workload management, geometry information management and conditions databases.

  3. HEP-FCE Working Group on Libraries and Tools

    E-Print Network [OSTI]

    Anders Borgland; Peter Elmer; Michael Kirby; Simon Patton; Maxim Potekhin; Brett Viren; Brian Yanny

    2015-06-03

    This is a report from the Libraries and Tools Working Group of the High Energy Physics Forum for Computational Excellence. It presents the vision of the working group for how the HEP software community may organize and be supported in order to more efficiently share and develop common software libraries and tools across the world's diverse set of HEP experiments. It gives prioritized recommendations for achieving this goal and provides a survey of a select number of areas in the current HEP software library and tools landscape. The survey identifies aspects which support this goal and areas with opportunities for improvements. The survey covers event processing software frameworks, software development, data management, workflow and workload management, geometry information management and conditions databases.

  4. Summary of the impedance working group

    SciTech Connect (OSTI)

    Chao, A.W.

    1995-05-01

    The impedance working group concentrated on the LHC design during the workshop. They look at the impedance contributions of liner, beam position monitors, shielded bellows, experimental chambers, superconducting cavities, recombination chambers, space charge, kickers, and the resistive wall. The group concluded that the impedance budgeting and the conceptual designs of the vacuum chamber components looked basically sound. It also noted, not surprisingly, that a large amount of studies are to be carried out further, and it ventured to give a partial list of these studies.

  5. Meeting Summary, Credit Trading Work Group

    SciTech Connect (OSTI)

    Kevin Bryan

    2000-12-07

    OAK-B135 Credit Trading Work Group Meeting Summary. The purpose of the meeting is to: (1) Provide an opportunity for NWCC Work Group Members, NWCC Members, and invited expert participants to hear an overview of the draft NWCC Credit Trading Report and to critically review and discuss the report's recommendations and principles. (2) Hear presentations from several perspectives of other experts on credit trading which provide: (a) a brief summary of credit trading activities they are involved in, and (b) critical responses to the NWCC draft report. (3) Identify how the report can be improved at the big picture level. Attempt to resolve issues or concerns if necessary. (4) Discuss the recommendations and credit trading principles in detail and attempt to reach consensus on these sections for presentation to the NWCC. (5) Discuss if any of the outreach and communication recommendations in the report should be conducted by the NWCC.

  6. Data Management Group Joint Program in Transportation

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Joint Program in Transportation University of Toronto System Access Request/DD/YY): __________________________ In signing this agreement, I agree to use my account on the computer system at the Data Management Group only of another user. Although the Data Management Group will attempt to maintain service at all times and provide

  7. Data Management Group Joint Program in Transportation

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Joint Program in Transportation University of Toronto System Access Request: __________________________________________________________________________ In signing this agreement, I agree to use my account on the computer system at the Data Management Group only of another user. Although the Data Management Group will attempt to maintain service at all times and provide

  8. Data Management Group Joint Program in Transportation

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Joint Program in Transportation University of Toronto System Access Request/DD/YY): ________________________ In signing this agreement, I agree to use my account on the computer system at the Data Management Group only of another user. Although the Data Management Group will attempt to maintain service at all times and provide

  9. Data Management Group Joint Program in Transportation

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Joint Program in Transportation University of Toronto access. Although the Data Management Group will attempt to maintain service at all times and provide regular file Management Group has attempted to ensure the accuracy of the data, the data is provided "as is

  10. Data Management Group Joint Program in Transportation

    E-Print Network [OSTI]

    Toronto, University of

    Data Management Group Joint Program in Transportation University of Toronto access of another user. Although the Data Management Group will attempt to maintain service at all times and provide Management Group has assembled the data from various sources and has attempted to ensure the data fields

  11. TEC Working Group Topic Groups Tribal Meeting Summaries | Department of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority SustainXSystem for39:TEC Working Group

  12. TEC Working Group Topic Groups | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority SustainXSystem for39:TEC Working GroupTopic

  13. Fuel Cell Council Working Group on Aircraft and Aircraft Ground...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Council Working Group on Aircraft and Aircraft Ground Support Fuel Cell Applications Fuel Cell Council Working Group on Aircraft and Aircraft Ground Support Fuel Cell Applications...

  14. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Group Workshop: Code for Hydrogen Pipelines Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines Code for Hydrogen Piping and Pipelines. B31 Hydrogen...

  15. Statement by Secretary Moniz on IPCC's Working Group Report on...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by Secretary Moniz on IPCC's Working Group Report on Climate Change Mitigation Statement by Secretary Moniz on IPCC's Working Group Report on Climate Change Mitigation April 13,...

  16. SEAB Endorsement of Office of Science Working Group | Department...

    Energy Savers [EERE]

    SEAB Endorsement of Office of Science Working Group SEAB Endorsement of Office of Science Working Group This memorandum from SEAB presents the recommendation from the Task Force on...

  17. Hydrogen Storage Systems Anlaysis Working Group Meeting, December...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Anlaysis Working Group Meeting, December 12, 2006 Hydrogen Storage Systems Anlaysis Working Group Meeting, December 12, 2006 This document provides a summary of the Hydrogen...

  18. Hydrgoen Storage Systems Analysis Working Group Meeting Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis Working Group Meeting Summary Report Summary report from the May 17, 2007 Hydrogen Storage Systems Analysis Working Group Meeting ssawgmaysummary.pdf More...

  19. BILIWG Meeting: DOE Hydrogen Quality Working Group Update and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Group Update and Recent Progress (Presentation) Presented at the 2007 Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group held November 6, 2007 in...

  20. Report of the QCD Working Group

    E-Print Network [OSTI]

    A. Ballestrero; P. Bambade; S. Bravo; M. Cacciari; M. Costa; W. deBoer; G. Dissertori; U. Flagmeyer; J. Fuster; K. Hamacher; F. Krauss; R. Kuhn; L. Lonnblad; S. Marti; J. Rehn; G. Rodrigo; M. H. Seymour; T. Sjostrand; Z. Trocsanyi; B. R. Webber

    2000-07-04

    The activities of the QCD working group concentrated on improving the understanding and Monte Carlo simulation of multi-jet final states due to hard QCD processes at LEP, i.e. quark-antiquark plus multi-gluon and/or secondary quark production, with particular emphasis on four-jet final states and b-quark mass effects. Specific topics covered are: relevant developments in the main event generators PYTHIA, HERWIG and ARIADNE; the new multi-jet generator APACIC++; description and tuning of inclusive (all-flavour) jet rates; quark mass effects in the three- and four-jet rates; mass, higher-order and hadronization effects in four-jet angular and shape distributions; b-quark fragmentation and gluon splitting into b-quarks.

  1. Working Group Report: Lattice Field Theory

    SciTech Connect (OSTI)

    Blum, T.; et al.,

    2013-10-22

    This is the report of the Computing Frontier working group on Lattice Field Theory prepared for the proceedings of the 2013 Community Summer Study ("Snowmass"). We present the future computing needs and plans of the U.S. lattice gauge theory community and argue that continued support of the U.S. (and worldwide) lattice-QCD effort is essential to fully capitalize on the enormous investment in the high-energy physics experimental program. We first summarize the dramatic progress of numerical lattice-QCD simulations in the past decade, with some emphasis on calculations carried out under the auspices of the U.S. Lattice-QCD Collaboration, and describe a broad program of lattice-QCD calculations that will be relevant for future experiments at the intensity and energy frontiers. We then present details of the computational hardware and software resources needed to undertake these calculations.

  2. Federal Utility Partnership Working Group Seminar: Washington Update

    Broader source: Energy.gov [DOE]

    Presentation covers the Federal Utility Partnership Working Group Seminar: Washington Update on May 22, 2013.

  3. Minutes from Durability Working Group Kick-off meeting

    Broader source: Energy.gov [DOE]

    Minutes from Durability Working Group Kick-off meeting sponsored by DOE Fuel Cell Technologies Program

  4. TEC Working Group Topic Groups Rail Meeting Summaries | Department...

    Office of Environmental Management (EM)

    - March 15, 2006 Pueblo TEC Meeting, Rail Topic Group Summary - September 22, 2005 Phoenix TEC Meeting, Rail Topic Group Summary - April 4, 2005 Minneapolis TEC Meeting, Rail...

  5. THE HIGGS WORKING GROUP: SUMMARY REPORT.

    SciTech Connect (OSTI)

    DAWSON, S.; ET AL.

    2005-08-01

    This working group has investigated Higgs boson searches at the Tevatron and the LHC. Once Higgs bosons are found their properties have to be determined. The prospects of Higgs coupling measurements at the LHC and a high-energy linear e{sup +}e{sup -} collider are discussed in detail within the Standard Model and its minimal supersymmetric extension (MSSM). Recent improvements in the theoretical knowledge of the signal and background processes are presented and taken into account. The residual uncertainties are analyzed in detail. Theoretical progress is discussed in particular for the gluon-fusion processes gg {yields} H(+j), Higgs-bremsstrahlung off bottom quarks and the weak vector-boson-fusion (VBF) processes. Following the list of open questions of the last Les Houches workshop in 2001 several background processes have been calculated at next-to-leading order, resulting in a significant reduction of the theoretical uncertainties. Further improvements have been achieved for the Higgs sectors of the MSSM and NMSSM. This report summarizes our work performed before and after the workshop in Les Houches. Part A describes the theoretical developments for signal and background processes. Part B presents recent progress in Higgs boson searches at the Tevatron collider. Part C addresses the determination of Higgs boson couplings, part D the measurement of tan {beta} and part E Higgs boson searches in the VBF processes at the LHC. Part F summarizes Higgs searches in supersymmetric Higgs decays, part G photonic Higgs decays in Higgs-strahlung processes at the LHC, while part H concentrates on MSSM Higgs bosons in the intense-coupling regime at the LHC. Part I presents progress in charged Higgs studies and part J the Higgs discovery potential in the NMSSM at the LHC. The last part K describes Higgs coupling measurements at a 1 TeV linear e{sup +}e{sup -} collider.

  6. TEC Working Group Topic Groups Archives Training- Medical Training

    Broader source: Energy.gov [DOE]

    The TEC Training and Medical Training Issues Topic Group was formed to address the training issues for emergency responders in the event of a radioactive material transportation incident.

  7. TEC Working Group Topic Groups Archives | Department of Energy

    Office of Environmental Management (EM)

    the following links: Communicatons Consolidated Grant Topic Group Training - Medical Training Protocols Route Identificaiton Process Mechanics of Funding and Technical Assistance...

  8. Federal Utility Partnership Working Group 2011 Meeting: Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 Meeting: Washington Update Federal Utility Partnership Working Group 2011 Meeting: Washington Update Presentation-given at the Fall 2011 Federal Utility Partnership Working...

  9. Research Management Group Efficiency Initiative

    E-Print Network [OSTI]

    Kay, Mark A.

    Medicine (CIRM) grants · New NIH Conflict of Interest (COI) policy implementation · Stanford Electronic and reports utilizing new preaward system (SeRA) · Annual Payroll Certification · Expansion of PI eligibility in compliance and management of the annual A133 audit · RMG took on the role of representing the So

  10. North American Energy Ministers Establish a Working Group on...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Establish a Working Group on Climate Change and Energy North American Energy Ministers Establish a Working Group on Climate Change and Energy May 25, 2015 - 2:25pm Addthis NEWS...

  11. Working Group Report on - Space Nuclear Power Systems and Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D "Even...

  12. Agenda for the High Temperature Membrane Working Group Meeting

    Broader source: Energy.gov [DOE]

    This agenda provides information about the Agenda for the High Temperature Membrane Working Group Meeting on September 14, 2006.

  13. LED Parking Lot Lighting Working Group Fact Sheet

    SciTech Connect (OSTI)

    2008-10-01

    This fact sheet describes the Retailer Energy Alliance LED Parking Lot Lighting Working Group and its Technology Procurement Project.

  14. Federal Utility Partnership Working Group: Welcome to Portland

    Broader source: Energy.gov [DOE]

    Presentation covers welcoming attendees to Portland at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  15. Proposed Agenda for High T Working Group Meeting: Paris

    Broader source: Energy.gov [DOE]

    Proposed agenda for the High Temperature Membrane Working Group Meeting held in Arlington, Virginia, Thursday, May 26,2005.

  16. High Temperature Membrane Working Group Meeting, May 14, 2007

    Broader source: Energy.gov [DOE]

    This agenda provides information about the High Temperature Membrane Working Group Meeting on May 14, 2007 in Arlington, Va.

  17. International Working Group for New Virtual Reality Applications in Architecture

    E-Print Network [OSTI]

    's developed VR applications in architecture. Group members come from eight universities around the worldWORLD8 International Working Group for New Virtual Reality Applications in Architecture YOSHIHIRO the activities of World8, an international working group on virtual reality (VR), and demonstrates the group

  18. Proposed Work Scope for the Rail Topic Group

    Office of Environmental Management (EM)

    Plan for TEC Rail Topic Group Status: Active DOE Leads: Office of Civilian Radioactive Waste Management (OCRWM), Office of National Transportation, Jay Jones and Alex Thrower...

  19. Hydrogen Storage Workshop Advanced Concepts Working Group

    E-Print Network [OSTI]

    / Current Status · Aerogels are the scaffold; template with organic functional groups; physisorption, acid benign ­ Inexpensive #12;Self-Assembled Nanocomposites ­ R&D Needs 1. Studying silica aerogels 2. Modifying aerogels 3. Theoretical Modeling - various chemical structures / materials 4. Functionalization

  20. Chemical Safety Vulnerability Working Group report. Volume 3

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 148 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 3 consists of eleven appendices containing the following: Field verification reports for Idaho National Engineering Lab., Rocky Flats Plant, Brookhaven National Lab., Los Alamos National Lab., and Sandia National Laboratories (NM); Mini-visits to small DOE sites; Working Group meeting, June 7--8, 1994; Commendable practices; Related chemical safety initiatives at DOE; Regulatory framework and industry initiatives related to chemical safety; and Chemical inventory data from field self-evaluation reports.

  1. Research Group: Finance "Dynamic risk management

    E-Print Network [OSTI]

    its operating cash ow exposure, due to the convexity in its cost of capital. When leverage exceeds 12-330 Research Group: Finance April 2012 "Dynamic risk management: investment, capital-Olivier Léautier #12;Dynamic risk management: investment, capital structure, and hedging in the presence

  2. Report of the Finance Cost Reduction Working Group to the Federal ESPC Steering Committee

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    Report of the Finance Cost Reduction Working Group to the Federal ESPC Steering Committee Reducing Financing Costs for Federal ESPCs Federal Energy Management Program Energy Savings Performance Contracting 2. REQUIREMENTS FOR COMPETITIVE FINANCING ACQUISITION .................................7 2.1 Use

  3. ARM Cloud Properties Working Group: Meeting Logistics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsicloudden Documentation Data Management Facility PlotsProducts (VAP) VAP38

  4. Training Work Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment ofOffice|inWestMayBuildingTheEasements30, 2008:|With aTraining Work

  5. Workforce Retention Work Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment| Department of EnergyDataWind TheEnergy WorkersRetention Work

  6. International Technical Working Group Round Robin Tests

    SciTech Connect (OSTI)

    Dudder, Gordon B.; Hanlen, Richard C.; Herbillion, Georges M.

    2003-02-01

    The goal of nuclear forensics is to develop a preferred approach to support illicit trafficking investigations. This approach must be widely understood and accepted as credible. The principal objectives of the Round Robin Tests are to prioritize forensic techniques and methods, evaluate attribution capabilities, and examine the utility of database. The HEU (Highly Enriched Uranium) Round Robin, and previous Plutonium Round Robin, have made tremendous contributions to fulfilling these goals through a collaborative learning experience that resulted from the outstanding efforts of the nine participating internal laboratories. A prioritized list of techniques and methods has been developed based on this exercise. Current work is focused on the extent to which the techniques and methods can be generalized. The HEU Round Robin demonstrated a rather high level of capability to determine the important characteristics of the materials and processes using analytical methods. When this capability is combined with the appropriate knowledge/database, it results in a significant capability to attribute the source of the materials to a specific process or facility. A number of shortfalls were also identified in the current capabilities including procedures for non-nuclear forensics and the lack of a comprehensive network of data/knowledge bases. The results of the Round Robin will be used to develop guidelines or a ''recommended protocol'' to be made available to the interested authorities and countries to use in real cases.

  7. Federal Utility Partnership Working Group: Atlanta Gas Light Resources

    Broader source: Energy.gov [DOE]

    Presentation—given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting—lists Altanta Gas Light (AGL) resources and features a map of its footprint.

  8. Blackout 2003: Electric System Working Group Technical Conference...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 16, 2003 Electric System Working Group Technical Conference, Philadelphia PA - Summary of comments and recommendations relating to the aftermath of the...

  9. Webinar: ASRAC Commercial/Industrial Pumps Working Group

    Broader source: Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the Appliance Standards and Rulemaking Federal Advisory Committee's (ASRAC) Commercial and Industrial Pumps Working Group. For more information,...

  10. ASRAC Fans and Blower Working Group Creation Notice of Intent

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    rulemaking process, and instead explore openly with other parties all ideas that may emerge from the working group's discussions. E. Facilitator The facilitator will act as a...

  11. Hydrogen Storage Systems Analysis Working Group Meeting: Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary of June 11, 2008, biannual meeting of the Hydrogen Storage Systems Analysis Working Group. ssawgsummaryreport0608.pdf More Documents & Publications Hydrgoen Storage...

  12. Summary of the TeV33 working group

    SciTech Connect (OSTI)

    Bagley, P.P.; Bieniosek, F.M.; Colestock, P.

    1996-10-01

    This summary of the TeV33 working group at Snowmass reports on work in the areas of Tevatron store parameters, the beam-beam interaction, Main Injector intensity (slip stacking), antiproton production, and electron cooling.

  13. Curriculum Revision REPORT OF AD HOC WORKING GROUP ON

    E-Print Network [OSTI]

    Brown, Sally

    Curriculum Revision REPORT OF AD HOC WORKING GROUP ON CURRICULUM REVISION (November 2002- March (2) Charge to Ad Hoc Working Group on Curriculum.............................. 12 (3) Materials;Curriculum Revision SUMMARY Curriculum transformation at the College of Forest Resources (CFR) is a response

  14. Summary Report of the Energy Issues Working Group

    E-Print Network [OSTI]

    Information Agency Annual Energy Outlook 1999. #12;Fusion Power Plant Attractiveness, Technical RiskSummary Report of the Energy Issues Working Group Organizer: Farrokh Najmabadi Covenors: Jeffrey Sauthoff 1999 Fusion Summer Study July 12-23, 1999, Snowmass, CO Energy Working Group Web Site: http

  15. Building Access Program Facilities Management Bridge Group

    E-Print Network [OSTI]

    Building Access Program Facilities Management Bridge Group January 21, 2014 #12;Campus Safety Initiatives · Lighting and Landscaping · Video Surveillance · Building Access #12;The Challenge · How do we;Components of Building Access · Perimeter automation · Tightening of public hours #12;Perimeter Automation

  16. Object Management Group Super Distributed Objects

    E-Print Network [OSTI]

    Suzuki, Jun

    Survey" (sdo/00-06-05). The idea for Super Distributed Objects is to provide a standard computingObject Management Group Super Distributed Objects A White Paper - Ver.1.00- Super Distributed Ltd. Stefan Arbanowski, GMD Fokus Junichi Suzuki, UC Irvine #12;Super Distributed Objects DSIG White

  17. Chemical Safety Vulnerability Working Group report. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 148 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 2 consists of seven appendices containing the following: Tasking memorandums; Project plan for the CSV Review; Field verification guide for the CSV Review; Field verification report, Lawrence Livermore National Lab.; Field verification report, Oak Ridge Reservation; Field verification report, Savannah River Site; and the Field verification report, Hanford Site.

  18. Working Group 5 Applying Mathematics in Realistic Situations Group Leaders: Ivan Meznik & Enrica Lemut

    E-Print Network [OSTI]

    Spagnolo, Filippo

    Working Group 5 ­ Applying Mathematics in Realistic Situations Group Leaders: Ivan Meznik & Enrica Lemut Seven papers have been presented and discussed out of the 9 announced and the 8 included people presenting a contribution participated to all the Working Group sessions; also other people

  19. Cesium legacy safety project management work plan

    SciTech Connect (OSTI)

    Durham, J.S.

    1998-04-21

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell).

  20. Federal Utility Partnership Working Group- Utility Interconnection Panel

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses solar/photovoltaic (PV) projects to connect with utility in California and their issues.

  1. Catalysis Working Group Kick-Off Meeting Agenda

    Broader source: Energy.gov [DOE]

    Agenda for the kick-off meeting of the U.S. Department of Energy Fuel Cell Technologies Program's Catalysis Working Group, held May 14, 2012, in Arlington, Virginia.

  2. [Draft minutes of IAPG Mechanical Working Group meeting

    SciTech Connect (OSTI)

    Skinner, D.M.

    1993-12-15

    This report provides the draft minutes of the Interagency Advanced Power Group meeting held November 3--4, 1993. Topics addressed are: Materials for thermal management; photovoltaic programs in the Airforce; ground based radar advanced power system development program; battery research; generator prognostics & diagnostics equipment; a thermal flight experiment test program; power systems assessment; Overview: Phillip`s space thermal technologies branch; and development of actuator thermal management.

  3. Summary Report from the Accelerator Working Group M. Harrison

    E-Print Network [OSTI]

    Wurtele, Jonathan

    colliders, muon colliders, very high energy hadron colliders, and advanced acceleration techniques Group at Snowmass was organized into five working sub-groups (all energies refer to center-of-mass): 1 of the community with respect to technical issues and identification of possible paths to a 1.5 TeV collision

  4. Accident management then and now: Progress since Di Salvo's work

    SciTech Connect (OSTI)

    Shotkin, L.M.

    1991-01-01

    The nuclear industry is now initiating a serious effort to define the elements of an accident management program at each utility with an operating reactor, which is a significant change in conditions from those in 1985, when the work of Di Salvo et al. was published. Each utility is now conducting an individual plant examination (IPE) to uncover plant vulnerabilities to severe accidents. In conjunction with the IPE program, the Nuclear Utility Management and Resources committee, the Electric Power Research Institute, and owners' groups are developing an accident management program. This program is emphasizing the management program. This program is emphasizing the management of severe accidents (i.e., accidents that proceed to significant core melt) including strategies for managing ex-vessel events. Attention is also being paid to interfacing any severe accident management strategies with existing emergency operating procedures already in place at utilities. The industry program is addressing the five elements define by the US Nuclear Regulatory Commission (NRC): (1) strategies; (2) instrumentation; (3) guidance and computational aids; (4) organization and decision making; and (5) training. It will also be able to accept new information as it becomes available from ongoing efforts to better understand severe accidents and how to manage them effectively.

  5. Summary Report of Working Group 1: Laser-Plasma Acceleration

    E-Print Network [OSTI]

    Geddes, Cameron Guy Robinson

    by the laser recently has been demonstrated to produce intense beams of electrons at MeV-GeV energies was on control, detailed diagnostics and physics models, and technological tools to work towards the beam needed? (Joint with computational working group) In addition, techniques for controlling electron beam

  6. Work and Energy Simulation Name_______________________ Lab Worksheet Group member names__________________________________

    E-Print Network [OSTI]

    Winokur, Michael

    Work and Energy Simulation Name_______________________ Lab Worksheet Group member names://phet.colorado.edu, in a browser and click on the Go to the simulations button. Open Work, Energy, and Power on the left. This lab uses three of the simulations on this page, Masses and Springs, Energy Skate Park, and The Ramp. I

  7. CRAFT Stakeholder's Workshop Working Group Charge and Issues

    E-Print Network [OSTI]

    Droegemeier, Kelvin K.

    and thematic servers · Web-based visualization tools for perusing data at NCDC · Tests bringing data out · Security · Mapping of base data to FM-94 BUFR and XML Break-Out Group #3: End-User Needs, Policy&D systems to operations · Project management and involvement of NOAA/tri-agencies · Future funding sources

  8. November 13 - 15, 2012 HSS Work Group Leadership Meeting Summary - Training Work Group

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties -DepartmentAvailable forSite |n t e gProgram | DepartmentTraining Work

  9. Catalyst Working Group Kick-off Meeting: Personal Commentary

    Broader source: Energy.gov [DOE]

    Personal commentary on future directions in fuel cell electrocatalysis, presented by Mark Debe, 3M, at the kick-off meeting of the U.S. Department of Energy Fuel Cell Technologies Program's Catalysis Working Group, held May 14, 2012, in Arlington, Virginia.

  10. DOE-EERE Durability Working Group Meeting Notes

    Broader source: Energy.gov [DOE]

    Meeting notes from the Fall 2011 Durability Working Group (DWG) Meeting sponsored by the U.S. Department of Energy (DOE) Fuel Cell Technologies Program. Notes also include a summary of progress on action items from the Spring 2011 DWG meeting.

  11. Historical Radio Astronomy Working Group IAU General Assembly

    E-Print Network [OSTI]

    Groppi, Christopher

    the observed radio waves and the stellar atmospheres research. The origin of the radio emission observed be present in the interstellar space to account for a free-free emission of the radio waves. In 1947 UnsöldProgram Historical Radio Astronomy Working Group IAU General Assembly Beijing, China Room 408

  12. IBM Watson Group Recruiting Event Ready to Work with Watson?

    E-Print Network [OSTI]

    IBM Watson Group Recruiting Event Ready to Work with Watson? Attend this session to learn about Watson opportunities INTERESTED YET? IBM is leading the real-world success of cognitive systems. Together and resources of IBM. Gates & Hillman 6115 LOCATION February, 18 2014 DATE 4PM - 7PM TIME WHO SHOULD ATTEND? 4

  13. Working group 4 Problems and prospects in thesaurus construction

    E-Print Network [OSTI]

    Soergel, Dagobert

    Working group 4 Problems and prospects in thesaurus construction Reported, arranged, and edited by Dagobert Soergel The discussion identified the following issues 1. Thesaurus use in relation to structure C what circumstances can a good thesaurus make what difference in retrieval and use of information? Which

  14. Tennessee Valley and Eastern Kentucky Wind Working Group

    SciTech Connect (OSTI)

    Katie Stokes

    2012-05-03

    In December 2009, the Southern Alliance for Clean Energy (SACE), through a partnership with the Appalachian Regional Commission, EKPC, Kentucky's Department for Energy Development and Independence, SACE, Tennessee's Department of Environment and Conservation, and TVA, and through a contract with the Department of Energy, established the Tennessee Valley and Eastern Kentucky Wind Working Group (TVEKWWG). TVEKWWG consists of a strong network of people and organizations. Working together, they provide information to various organizations and stakeholders regarding the responsible development of wind power in the state. Members include representatives from utility interests, state and federal agencies, economic development organizations, non-government organizations, local decision makers, educational institutions, and wind industry representatives. The working group is facilitated by the Southern Alliance for Clean Energy. TVEKWWG supports the Department of Energy by helping educate and inform key stakeholders about wind energy in the state of Tennessee.

  15. Joint Symposium of ICA Working Group on CEWaCM and JBGIS Gi4DM Cartography and Geoinformatics

    E-Print Network [OSTI]

    Köbben, Barend

    Joint Symposium of ICA Working Group on CEWaCM and JBGIS Gi4DM Cartography and Geoinformatics://c4c.geogr.muni.cz #12;CARTOGRAPHY AND GEOINFORMATICS FOR EARLY WARNING AND EMERGENCY MANAGEMENT

  16. Working Group Reports A Short-Wave Radiometer Array Across

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricNCubictheThepresented in1: Model or Working Group9

  17. Working Group Reports Unmanned Aerospace Vehicle Workshop J. Vitko, Jr.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricNCubictheThepresented in1: Model or Working Group97

  18. + University of California Riverside + Executive Management Policy Group

    E-Print Network [OSTI]

    to this guide The Executive Management Policy Group (EMPG) is the executive level oversight and strategic involved in the day-to-day management of the crisis. The EMPG makes proactive policy and strategicCrisis & Emergency + University of California Riverside + Executive Management Policy Group Crisis

  19. Summary: Working Group on QCD and Strong Interactions

    E-Print Network [OSTI]

    E. L. Berger; Stephen Magill; I. Sarcevic; J. Jalilian-Marian; W. B. Kilgore; Anna Kulesza; W. Vogelsang; R. V. Harlander; E. Kinney; R. Ball; B. Flaugher; W. Giele; P. Mackenzie; Z. Sullivan; C. Balazs; L. Reina; W. -K. Tung; N. Kidonakis; P. Nadolsky; F. Olness; G. Sterman; S. D. Ellis

    2002-02-07

    In this summary of the considerations of the QCD working group at Snowmass 2001, the roles of quantum chromodynamics in the Standard Model and in the search for new physics are reviewed, with empahsis on frontier areas in the field. We discuss the importance of, and prospects for, precision QCD in perturbative and lattice calculations. We describe new ideas in the analysis of parton distribution functions and jet structure, and review progress in small-$x$ and in polarization.

  20. Training Work Group Status Overview - July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitleJuly 2012 Training Work Group Status

  1. Training Work Group Status Overview - September 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitleJuly 2012 Training Work Group

  2. Summary of the particle physics and technology working group

    SciTech Connect (OSTI)

    Stephan Lammel et al.

    2002-12-10

    Progress in particle physics has been tightly related to technological advances during the past half century. Progress in technologies has been driven in many cases by the needs of particle physics. Often, these advances have benefited fields beyond particle physics: other scientific fields, medicine, industrial development, and even found commercial applications. The particle physics and technology working group of Snowmass 2001 reviewed leading-edge technologies recently developed or in the need of development for particle physics. The group has identified key areas where technological advances are vital for progress in the field, areas of opportunities where particle physics may play a principle role in fostering progress, and areas where advances in other fields may directly benefit particle physics. The group has also surveyed the technologies specifically developed or enhanced by research in particle physics that benefit other fields and/or society at large.

  3. Preliminary results of the APAC spills working group

    SciTech Connect (OSTI)

    Brereton, S.; Hesse, D.; kalinich, D.; Lazaro, M.; Mubayi, V.; Shinn, J.

    1996-04-01

    The Spills Working Group is one of 6 working groups under the DOE-DP Accident Phenomenology and Consequence (APAC) methodology evaluation program. Objectives are to assess methodologies available in this area, evaluate their adequacy for accident analysis at DOE facilities, identify development needs, and define standard practices to be followed in the analyses supporting facility safety basis documentation. The group focused on methodologies for estimating 4 types of spill source terms: liquid chemical spills and evaporation, pressurized liquid/gas releases, solid spills and resuspension/sublimation, and resuspension of particulate matter from liquid spills. Computer models were identified with capabilities for quantifying release rates or released amounts from spills, and a set of sample test problems was established for evaluating a specific model for some common or probable accident release scenarios. The group agreed on a set of recommended computer codes which are classified according to spill type and hazard category. Code results for a given problem varied by up to an order of magnitude; this is attributed to differences in how the physics and thermodynamics of the problems were treated by the models.

  4. Policy Name: Administrative Leave Entitlement for Academic Management Group

    E-Print Network [OSTI]

    Carleton University

    management appointment shall be preserved and shall be counted towards the next sabbatical leave whenPolicy Name: Administrative Leave Entitlement for Academic Management Group Originating positions in order to increase their knowledge, further their research, stimulate intellectual interest

  5. Oak Ridge Environmental Management Program Completes Work at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately 17.5 million...

  6. Summary Report of Working Group 1: Laser-Plasma Acceleration

    SciTech Connect (OSTI)

    Geddes, C.G.R.; Clayton, C.; Lu, W.; Thomas, A.G.R.

    2010-06-01

    Advances in and physics of the acceleration of particles using underdense plasma structures driven by lasers were the topics of presentations and discussions in Working Group 1 of the 2010 Advanced Accelerator Concepts Workshop. Such accelerators have demonstrated gradients several orders beyond conventional machines, with quasi-monoenergetic beams at MeV-GeV energies, making them attractive candidates for next generation accelerators. Workshop discussions included advances in control over injection and laser propagation to further improve beam quality and stability, detailed diagnostics and physics models of the acceleration process, radiation generation as a source and diagnostic, and technological tools and upcoming facilities to extend the reach of laser-plasma accelerators.

  7. Activities of the PNC Nuclear Safety Working Group

    SciTech Connect (OSTI)

    Kato, W.Y.

    1991-12-31

    The Nuclear Safety Working Group of the Pacific Nuclear Council promotes nuclear safety cooperation among its members. Status of safety research, emergency planning, development of lists of technical experts, severe accident prevention and mitigation have been the topics of discussion in the NSWG. This paper reviews and compares the severe accident prevention and mitigation program activities in some of the areas of the Pacific Basin region based on papers presented at a special session organized by the NSWG at an ANS Topical Meeting as well as papers from other sources.

  8. Activities of the PNC Nuclear Safety Working Group

    SciTech Connect (OSTI)

    Kato, W.Y.

    1991-01-01

    The Nuclear Safety Working Group of the Pacific Nuclear Council promotes nuclear safety cooperation among its members. Status of safety research, emergency planning, development of lists of technical experts, severe accident prevention and mitigation have been the topics of discussion in the NSWG. This paper reviews and compares the severe accident prevention and mitigation program activities in some of the areas of the Pacific Basin region based on papers presented at a special session organized by the NSWG at an ANS Topical Meeting as well as papers from other sources.

  9. Waste Management Committee Fiscal Year 2012 Work Plan | Department...

    Office of Environmental Management (EM)

    Committee Fiscal Year 2012 Work Plan Waste Management Committee Fiscal Year 2012 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles Consent Order WM-FY12-WP - September...

  10. New Particles Working Group Report of the Snowmass 2013 Community Summer Study

    E-Print Network [OSTI]

    Y. Gershtein; M. Luty; M. Narain; L. -T. Wang; D. Whiteson; K. Agashe; L. Apanasevich; G. Artoni; A. Avetisyan; H. Baer; C. Bartels; M. Bauer; D. Berge; M. Berggren; S. Bhattacharya; K. Black; T. Bose; J. Brau; R. Brock; E. Brownson; M. Cahill-Rowley; A. Cakir; A. Chaus; T. Cohen; B. Coleppa; R. Cotta; N. Craig; K. Dienes; B. Dobrescu; D. Duggan; R. Essig; J. Evans; A. Drlica-Wagner; S. Funk; J. George; F. Goertz; T. Golling; T. Han; A. Haas; M. Hance; D. Hayden; U. Heintz; A. Henrichs; J. Hewett; J. Hirschauer; K. Howe; A. Ismail; K. Kaadze; Y. Kats; F. Kling; D. Kolchmeyer; D. Kr"ucker; K. C. Kong; A. Kumar; G. Kribs; P. Langacker; A. Lath; S. J. Lee; J. List; T. Lin; L. Linssen; T. Liu; Z. Liu; A. Lobanov; J. Loyal; A. Martin; I. Melzer-Pellmann; M. M. Nojiri; S. Padhi; N. Parashar; B. Penning; M. Perelstein; M. Peskin; A. Pierce; W. Porod; C. Potter; T. Rizzo; G. Sciolla; J. Stupak III; S. Su; T. M. P. Tait; T. Tanabe; B. Thomas; S. Thomas; S. Upadhyay; N. Varelas; E. Varnes; L. Vecchi; A. Venturini; B. Vormwald; J. Wacker; M. Walker; M. Wood; F. Yu; N. Zhou

    2013-11-01

    This report summarizes the work of the Energy Frontier New Physics working group of the 2013 Community Summer Study (Snowmass).

  11. OSU Office of Risk Management Foreign Citizens Working Abroad

    E-Print Network [OSTI]

    Tullos, Desiree

    OSU Office of Risk Management Foreign Citizens Working Abroad Student/Employee Name: Phone: E the Office of Risk Management (ORM) for additional information. Student/Employee Status: (full warning or sanction, contact the Office of Risk Management at OSU. Special conditions may apply

  12. June 25, 2015 Manager, IT Technology Support Group

    E-Print Network [OSTI]

    June 25, 2015 Manager, IT ­ Technology Support Group StFX is a top ranking Canadian university and we are seeking a Manager, IT to join our IT Services team reporting to the Director, Technology, and identifying requirements for and researching solutions to technology issues. The Manager, IT is responsible

  13. US-EU-Japan Working Group on Critical Materials

    Energy Savers [EERE]

    Rare Earth Elements - feeding the global supply chain Janice Zinck, Manager, Natural Resources Canada -Mine Waste Management and Processing Research Program 12:50 The current...

  14. Group Dynamics Approach to Industrial Energy Management 

    E-Print Network [OSTI]

    Thomas, D. G.

    1993-01-01

    This paper is aimed at people who want to start or rejuvenate an energy management effort. The information in this paper is based on a combination of four years as the energy coordinator of a fertilizer manufacturing plant ...

  15. The QCD/SM working group: A Summary report

    SciTech Connect (OSTI)

    Alekhin, S.; Balazs, C.; Ball, R.; Binoth, T.; Boos, E.; Botje, M.; Cacciari, M.; Catani, S.; Del Duca, V.; Dobbs, M.; Ellis, S.D.; Field, R.; deFlorian, D.; Forte, S.; Gardi, E.; Gehrmann, T.; Gehrmann-De Riddler, A.; Giele, W.; Glover, E.W.N.; Grazzini, M.; Guillet, J.-Ph.; HeinRich, G.; Huston, J.; Hinchliffe, I.; Llyin, V.; Kanzaki, J.; Kato, K.; Kersevan, B.; Kidonakis, N.; Kulesza, A.; Kurihara, Y.; Laenen, E.; Lassila-Perini, K.; Lonnblad, L.; Magnea, L.; Mangano, M.; Mazumudar, K.; Moch, S.; Mrenna, S.; Nadolsky, P.; Nason, P.; Olness, F.; Paige, F.; Puljak, I.; Pumplin, J.; Richter-Was, E.; Salam, G.; Scalise, R.; Seymour, M.; Sjostrand, T.; Sterman, G.; Monnesmann, M.; Tournefier, E.; Vogelsang, W.; Vogt, A.; Vogt, R.; Webber, B.; Yuan, C.-P.; Zeppenfeld, D.

    2002-04-01

    This report documents the results obtained by the Working Group on Quantum Chromodynamics and the Standard Model for the Workshop ''Physics at TeV Colliders,'' Les Houches, France, 26 May - 6 June 2003. After a Monte Guide description, the first contributions report on progress in describing multiple interactions, important for the LHC, and underlying events. An announcement of a Monte Carlo database, under construction, is then followed by a number of contributions improving parton shower descriptions. Subsequently, a large number of contributions address resummations in various forms, after which follow studies of QCD effects in pion pair, top quark pair and photon pair plus jet production. After a study of electroweak corrections to hadronic precision observables, the report ends by presenting recent progress in methods to compute finite order corrections at one-loop with many legs, and at two-loop.

  16. Working Group Report: Computing for the Intensity Frontier

    SciTech Connect (OSTI)

    Rebel, B.; Sanchez, M.C.; Wolbers, S.

    2013-10-25

    This is the report of the Computing Frontier working group on Lattice Field Theory prepared for the proceedings of the 2013 Community Summer Study ("Snowmass"). We present the future computing needs and plans of the U.S. lattice gauge theory community and argue that continued support of the U.S. (and worldwide) lattice-QCD effort is essential to fully capitalize on the enormous investment in the high-energy physics experimental program. We first summarize the dramatic progress of numerical lattice-QCD simulations in the past decade, with some emphasis on calculations carried out under the auspices of the U.S. Lattice-QCD Collaboration, and describe a broad program of lattice-QCD calculations that will be relevant for future experiments at the intensity and energy frontiers. We then present details of the computational hardware and software resources needed to undertake these calculations.

  17. July 10-11, 2012, HSS Focus Group Training Work Group - Attendees

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA Public CommentInverted Attic9: HSS Focus Group Training Work

  18. HEP-FCE Working Group on Libraries and Tools

    SciTech Connect (OSTI)

    Borgland, Anders; Elmer, Peter; Kirby, Michael; Patton, Simon; Potekhin, Maxim; Viren, Brett; Yanny, Brian

    2014-12-19

    The High-Energy Physics Forum for Computational Excellence (HEP-FCE) was formed by the Department of Energy as a follow-up to a recent report from the Topical Panel on Computing[1] and the associated P5 recommendation[2]. It is a pilot project distributed across the DOE Labs. During this initial incubation period the Forum is to develop a plan for a robust, long-term organization structure and a functioning web presence for forum activities and outreach, and a study of hardware and software needs across the HEP program. In the following sections we give this working group’s “vision” for aspects and qualities we wish to see in a future HEP-FCE. We then give a prioritized list of technical activities with suggested scoping and deliverables that can be expected to provide cross-experiment benefits. The remaining bulk of the report gives a technical survey of some specific “areas of opportunity” for cross-experiment benefit in the realm of software libs/tools. This survey serves as support for the vision and prioritized list. For each area we describe the ways that cross-experiment benefit is achieved today, as well as describe known failings or pitfalls where such benefit has failed to be achieved and which should be avoided in the future. For both cases, we try to give concrete examples. Each area then ends with an examination of what opportunities exist for improvements in that particular area.

  19. Minutes of the October 2008 Meeting of the High Temperature Membrane Working Group

    Broader source: Energy.gov [DOE]

    Meeting minutes of the High Temperature Membrane Working Group from October 16, 2008, in Honolulu, Hawaii.

  20. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  1. TEC Working Group Topic Groups Tribal Key Documents | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority SustainXSystem for39:TEC Working Group Topic

  2. University of Glasgow Carbon Management Programme Carbon Management Plan working with

    E-Print Network [OSTI]

    Swain, Peter

    fully in the initiatives which will help us reduce our carbon footprint and combat climate changeUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon Management Programme Carbon Management Plan (CMP) Albert Young, 3 November 2009 #12;University of Glasgow

  3. Federal Utility Partnership Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    group develops strategies to implement cost-effective energy efficiency and water conservation projects through utility incentive programs at Federal sites. The mission and...

  4. DOI Strategic Sciences Working Group Mississippi Canyon 252/Deepwater Horizon Oil Spill

    E-Print Network [OSTI]

    DOI Strategic Sciences Working Group Mississippi Canyon 252/Deepwater Horizon Oil Spill Strategic Sciences Working Group Mississippi Canyon 252/Deepwater Horizon Oil Spill Progress Report Executive Summary Introduction and Objectives The Mississippi Canyon 252/Deepwater Horizon (MS252) oil spill

  5. MFE Concept Integration and Performance Measures Magnetic Fusion Concept Working Group

    E-Print Network [OSTI]

    MFE Concept Integration and Performance Measures Magnetic Fusion Concept Working Group Contributors. Simonen, T. Thorson INTRODUCTION This subgroup of the Magnetic Fusion Concepts Working Group discussed the plans for developing the major magnetic confinement concepts: standard pulsed tokamak, advanced tokamak

  6. Nuclear Physics & Modeling, AFC R&D Nuclear Physics Working Group...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Physics & Modeling, AFC R&D Nuclear Physics Working Group Citation Details In-Document Search Title: Nuclear Physics & Modeling, AFC R&D Nuclear Physics Working Group...

  7. Working Groups Collaborate on U.S. Virgin Islands Clean Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Groups Collaborate on U.S. Virgin Islands Clean Energy Vision and Road Map Working Groups Collaborate on U.S. Virgin Islands Clean Energy Vision and Road Map A diverse set...

  8. Report of the Solar and Atmospheric Neutrino Working Group

    SciTech Connect (OSTI)

    Back, H.; Bahcall, J.N.; Bernabeu, J.; Boulay, M.G.; Bowles, T.; Calaprice, F.; Champagne, A.; Freedman, S.; Gai, M.; Galbiati, C.; Gallagher, H.; Gonzalez-Garcia, C.; Hahn, R.L.; Heeger, K.M.; Hime, A.; Jung, C.K.; Klein, J.R.; Koike, M.; Lanou, R.; Learned, J.G.; Lesko, K.T.; Losecco, J.; Maltoni, M.; Mann, A.; McKinsey, D.; Palomares-Ruiz, S.; Pena-Garay, C.; Petcov, S.T.; Piepke, A.; Pitt, M.; Raghavan, R.; Robertson, R.G.H.; Scholberg, K.; Sobel, H.W.; Takeuchi, T.; Vogelaar, R.; Wolfenstein, L.

    2004-10-22

    The highest priority of the Solar and Atmospheric Neutrino Experiment Working Group is the development of a real-time, precision experiment that measures the pp solar neutrino flux. A measurement of the pp solar neutrino flux, in comparison with the existing precision measurements of the high energy {sup 8}B neutrino flux, will demonstrate the transition between vacuum and matter-dominated oscillations, thereby quantitatively testing a fundamental prediction of the standard scenario of neutrino flavor transformation. The initial solar neutrino beam is pure {nu}{sub e}, which also permits sensitive tests for sterile neutrinos. The pp experiment will also permit a significantly improved determination of {theta}{sub 12} and, together with other solar neutrino measurements, either a measurement of {theta}{sub 13} or a constraint a factor of two lower than existing bounds. In combination with the essential pre-requisite experiments that will measure the {sup 7}Be solar neutrino flux with a precision of 5%, a measurement of the pp solar neutrino flux will constitute a sensitive test for non-standard energy generation mechanisms within the Sun. The Standard Solar Model predicts that the pp and {sup 7}Be neutrinos together constitute more than 98% of the solar neutrino flux. The comparison of the solar luminosity measured via neutrinos to that measured via photons will test for any unknown energy generation mechanisms within the nearest star. A precise measurement of the pp neutrino flux (predicted to be 92% of the total flux) will also test stringently the theory of stellar evolution since the Standard Solar Model predicts the pp flux with a theoretical uncertainty of 1%. We also find that an atmospheric neutrino experiment capable of resolving the mass hierarchy is a high priority. Atmospheric neutrino experiments may be the only alternative to very long baseline accelerator experiments as a way of resolving this fundamental question. Such an experiment could be a very large scale water Cerenkov detector, or a magnetized detector with flavor and antiflavor sensitivity. Additional priorities are nuclear physics measurements which will reduce the uncertainties in the predictions of the Standard Solar Model, and similar supporting measurements for atmospheric neutrinos (cosmic ray fluxes, magnetic fields, etc.). We note as well that the detectors for both solar and atmospheric neutrino measurements can serve as multipurpose detectors, with capabilities of discovering dark matter, relic supernova neutrinos, proton decay, or as targets for long baseline accelerator neutrino experiments.

  9. DOE NE Used Fuel Disposition FY2015 Working Group Presentations http://energy.sandia.gov/energy/nuclear-energy/ne-workshops/ufd-working-group-2015/

    E-Print Network [OSTI]

    DOE NE Used Fuel Disposition FY2015 Working Group Presentations http://energy.sandia.gov/energy/nuclear-energy 1 of 5 #12;DOE NE Used Fuel Disposition FY2015 Working Group Presentations http://energy.sandia.gov/energy/nuclear-energy Level Waste Rigali UFD WG 2015-06-10 Wed Afternoon 1245 Salt Repository Research Actinide and Microbial

  10. Group work with families of nursing home residents 

    E-Print Network [OSTI]

    Duncan, Richard Tillett

    1985-01-01

    during this time. A few nursing homes around the country have begun to offer these families various forms of workshops, expert presentations, and/or family group meetings. Similar programs have recently been offered by churches, non..., and that discussion among participants would be encouraged (Greene, 1982; LeSage, 1978). Other researchers have suggested that family group meetings or workshops be organized such that family representatives could be joined by nursing home personnel to mutually...

  11. 13 Sep 2001 http://www.ccsm.ucar.edu/working_groups/Software/reports/010628.html Report on CCSM Software Engineering Working Group Meeting

    E-Print Network [OSTI]

    the meeting with an overview of the new CCSM Software Engineering Group (CSEG). Tony is managing the group methodology. Steve Thomas (NCAR/SCD) presented early results from a high-performance spectral element method Kluzek erik@ucar.edu NCAR Keith Lindsay klindsay@ucar.edu NCAR Rebecca McKeown beckym@nrel

  12. Toxic and deadly: Working to manage algae in Lake Granbury 

    E-Print Network [OSTI]

    Wythe, Kathy

    2011-01-01

    Working to manage algae in Lake Granbury Lake Granbury, located about 33 miles southwest of Fort Worth, is a recreation haven for water enthusiasts. In recent years, however, bacteria and golden algae have threatened the lake?s water quality.... Educating citizens about water quality issues affecting Lake Granbury and determining ways to manage the deadly algae are the focus of two Texas Water Resources Institute (TWRI) projects. Lake Granbury, a critical water supply in North Central Texas...

  13. Toxic and deadly: Working to manage algae in Lake Granbury 

    E-Print Network [OSTI]

    Wythe, Kathy

    2010-01-01

    Working to manage algae in Lake Granbury Lake Granbury, located about 33 miles southwest of Fort Worth, is a recreation haven for water enthusiasts. In recent years, however, bacteria and golden algae have threatened the lake?s water quality.... Educating citizens about water quality issues affecting Lake Granbury and determining ways to manage the deadly algae are the focus of two Texas Water Resources Institute (TWRI) projects. Lake Granbury, a critical water supply in North Central Texas...

  14. Group Health Management of UAV Teams With Applications to Persistent Surveillance

    E-Print Network [OSTI]

    Group Health Management of UAV Teams With Applications to Persistent Surveillance Brett Bethke, Jonathan P. How, and John Vian Abstract-- Unmanned aerial vehicles (UAVs) are well-suited to a wide range and dis- tributed nature of these missions often requires teams of UAVs to work together. Furthermore

  15. Manager Group Name Location Name Title Contact E mail

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousandReport)Price (Dollars8-2011. Management's1-25-2013.Manager Group

  16. North American Energy Work Group Releases Updated Trilateral Energy Report

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926 News en INFOGRAPHIC: HowFranklinthe Environment ||

  17. Federal Utility Partnership Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: AlternativeCommunication3-EDepartmentExerciseCarbon4Department of EnergyGroup Federal Utility

  18. July 2012, 10 CFR 851 Work Group Status Overview

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA Public CommentInverted Attic9: HSS Focus Group10 CFRJuly

  19. Textile and Apparel Technology and Management Scholarly and Creative Works

    E-Print Network [OSTI]

    Liu, Paul

    Science, pp. 47, 5114-5120. Suh, M. & Lee, H. (2012). Strategic Use of CAD/CAM technology for apparel Polymer Science, 123, 4, p. 2095-2106. DOI: 10.1002/app.34712 Yilmaz, N. D., Powell, N. B., Michielsen, S1 Textile and Apparel Technology and Management Scholarly and Creative Works May 1, 2011 ­ April 30

  20. MANAGING UNCERTAINTIES ASSOCIATED WITH RADIOACTIVE WASTE DISPOSAL: TASK GROUP 4 OF THE IAEA PRISM PROJECT

    SciTech Connect (OSTI)

    Seitz, R.

    2011-03-02

    It is widely recognized that the results of safety assessment calculations provide an important contribution to the safety arguments for a disposal facility, but cannot in themselves adequately demonstrate the safety of the disposal system. The safety assessment and a broader range of arguments and activities need to be considered holistically to justify radioactive waste disposal at any particular site. Many programs are therefore moving towards the production of what has become known as a Safety Case, which includes all of the different activities that are conducted to demonstrate the safety of a disposal concept. Recognizing the growing interest in the concept of a Safety Case, the International Atomic Energy Agency (IAEA) is undertaking an intercomparison and harmonization project called PRISM (Practical Illustration and use of the Safety Case Concept in the Management of Near-surface Disposal). The PRISM project is organized into four Task Groups that address key aspects of the Safety Case concept: Task Group 1 - Understanding the Safety Case; Task Group 2 - Disposal facility design; Task Group 3 - Managing waste acceptance; and Task Group 4 - Managing uncertainty. This paper addresses the work of Task Group 4, which is investigating approaches for managing the uncertainties associated with near-surface disposal of radioactive waste and their consideration in the context of the Safety Case. Emphasis is placed on identifying a wide variety of approaches that can and have been used to manage different types of uncertainties, especially non-quantitative approaches that have not received as much attention in previous IAEA projects. This paper includes discussions of the current results of work on the task on managing uncertainty, including: the different circumstances being considered, the sources/types of uncertainties being addressed and some initial proposals for approaches that can be used to manage different types of uncertainties.

  1. Nuclear Materials Management and Safeguards System Working Group Charter

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal of HonorPoster Session |SecurityNSDDfor 5th NEWSNotice

  2. Records Management Working Group Charter | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment ofOffice|inWestMay 13, 2015 The new technology repels water2TheseThe

  3. High Temperature Membrane Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nA Guide to TappingWORK BREAKDOWNEnergy howBuilding

  4. The ChiCI Group This paper describes the work, the vision, and the

    E-Print Network [OSTI]

    welcomes associate members from similar research groups around the globe. Eight of the full membersThe ChiCI Group Abstract This paper describes the work, the vision, and the approach of the Child Computer Interaction (ChiCI) group at the University of Central Lancashire in the UK. This group, formed

  5. Risk Assessment Technical Expert Working Group (RWG) Conference Call Minutes, March 8, 2010

    Broader source: Energy.gov [DOE]

    Risk Assessment Technical Experts Working Group Charter – The steeringcommittee discussed the draft charter. Two recommended changes were agreed upon:• A sentence will be added to identify that the...

  6. Risk Assessment Technical Expert Working Group (RWG)Conference Call Minutes, February 20, 2010

    Broader source: Energy.gov [DOE]

    Risk Assessment Technical Experts Working Group Charter – discussed whoshould sign and at what level the charter should be authorized. It was concluded thatthe Under Secretaries as the Central...

  7. Working Group Presentations | U.S. DOE Office of Science (SC...

    Office of Science (SC) Website

    Working Group Presentations Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP Funding Opportunities Nuclear Science Advisory Committee (NSAC)...

  8. High Temperature Membrane Working Group, Minutes of Meeting on September 14, 2006

    Broader source: Energy.gov [DOE]

    These meeting minutes provide information about the High Temperature Membrane Working Group meeting on September 14, 2006 in San Francisco, Ca.

  9. Spent Fuel Working Group report on inventory and storage of the Department`s spent nuclear fuel and other reactor irradiated nuclear materials and their environmental, safety and health vulnerabilities. Volume 2, Working Group Assessment Team reports; Vulnerability development forms; Working group documents

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Secretary of Energy`s memorandum of August 19, 1993, established an initiative for a Department-wide assessment of the vulnerabilities of stored spent nuclear fuel and other reactor irradiated nuclear materials. A Project Plan to accomplish this study was issued on September 20, 1993 by US Department of Energy, Office of Environment, Health and Safety (EH) which established responsibilities for personnel essential to the study. The DOE Spent Fuel Working Group, which was formed for this purpose and produced the Project Plan, will manage the assessment and produce a report for the Secretary by November 20, 1993. This report was prepared by the Working Group Assessment Team assigned to the Hanford Site facilities. Results contained in this report will be reviewed, along with similar reports from all other selected DOE storage sites, by a working group review panel which will assemble the final summary report to the Secretary on spent nuclear fuel storage inventory and vulnerability.

  10. ENERGY ISSUES WORKING GROUP ON LONG-TERM VISIONS FOR FUSION POWER

    E-Print Network [OSTI]

    Najmabadi, Farrokh

    ENERGY ISSUES WORKING GROUP ON LONG-TERM VISIONS FOR FUSION POWER Don Steiner, Jeffrey Freidberg Farrokh Najmabadi William Nevins , and John Perkins The Energy Issues Working Group on Long-Term Visions energy production in the next century? 2. What is fusion's potential for penetrating the energy market

  11. MFE Concept Integration and Performance Measures Magnetic Fusion Concept Working Group

    E-Print Network [OSTI]

    MFE Concept Integration and Performance Measures Magnetic Fusion Concept Working Group Contributors. Simonen, T. Thorson INTRODUCTION This subgroup of the Magnetic Fusion Concepts Working Group discussed, spherical torus, compact stellarator, reversed-field pinch, and spheromak The goal was to identify, for each

  12. Library Web Standards Recommendations of the SCIS Web Standards Working Group

    E-Print Network [OSTI]

    Burg, Theresa

    Library Web Standards Recommendations of the SCIS Web Standards Working Group Prepared by L. Jacobs, J. Head, L. Steinke (1997 February 8) Revised by Web Page Working Group, a sub of the Library. Goals of Library Web Pages: To facilitate access to Library resources To supplement access

  13. 12010-10-21 ESDSWG -Technolgy Infusion Working Group Technology Infusion Process

    E-Print Network [OSTI]

    Christian, Eric

    /function provided vs. needs). Technology assessment matrix with scores. ­ Cost/benefit analysis. ­ Proof of concept12010-10-21 ESDSWG - Technolgy Infusion Working Group Technology Infusion Process Steve Olding 9th Infusion Working Group Technology Infusion Process 2009 Stakeholder needs identification Science needs End

  14. July 10-11, 2012, HSS Focus Group Training Work Group - Meeting Minutes

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA Public CommentInverted Attic9: HSS Focus Group Training

  15. Work Plan - U.S.-India Coal Working Group | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'S FUTURE.Energy Wind PowerRegina RameikaWork Plan - U.S.-India Coal

  16. Interagency Advanced Power Group, Joint Electrical and Nuclear Working Group, meeting minutes, November 16--17, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31

    Reports on soldier power R&D review, N-MCT power electronic building blocks, silicon carbide power semiconductor work, and ground based radar were made to the Power Conditioning Panel. An introduction to high temperature electronics needs, research and development was made to the High Temperature Electronics Subcommittee. The Pulse Power Panel received reports on the navy ETC gun, and army pulse power. The Superconductivity Panel received reports on high-tc superconducting wires, superconducting magnetic energy storage, and superconducting applications. The Nuclear Working Group received presentations on the Topaz nuclear power program, and space nuclear work in the Department of Energy.

  17. ISSUANCE 2015-05-01: Commercial Package Air Conditioners and Commercial Warm Air Furnaces Working Group; Notice of Open Meetings

    Broader source: Energy.gov [DOE]

    Commercial Package Air Conditioners and Commercial Warm Air Furnaces Working Group; Notice of Open Meetings

  18. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  19. Fuel Cell Council Working Group on Aircraft and Aircraft Ground Support Fuel

    E-Print Network [OSTI]

    Members #12;USFCC Working Groups Government Affairs Codes & Standards Education & Marketing Materials Storage Materials Codes & Standards #12;Regulatory Affairs Facilitate international open markets Develop, NFPA, ASME, CSA, UL, IEEE, and others Published technical papers on PEM and SOFC Nomenclature, costing

  20. SEAB Memorandum on the Office of Science Working Group to study...

    Broader source: Energy.gov (indexed) [DOE]

    from SEAB presents the recommendation from the Task Force on National Laboratories that the Office of Science establish a working group to study potential modifications to M&O...

  1. Security Working Group Marty Humphrey GRID FORUM DRAFT University of Virginia

    E-Print Network [OSTI]

    Lee, Ruby B.

    Security Working Group Marty Humphrey GRID FORUM DRAFT University of Virginia Mary Thompson] Security Implications of Typical Grid Computing Usage Scenarios security-implications-01 ways to access the immense computational power of a Computational Grid, each with unique security

  2. Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group Background Paper

    Broader source: Energy.gov [DOE]

    Paper by Arlene Anderson and Tracy Carole presented at the Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group, with a focus on key drivers, purpose, and scope.

  3. Marine Studies Initiative, Oregon State University Learning Models Working Group Report

    E-Print Network [OSTI]

    Tullos, Desiree

    Marine Studies Initiative, Oregon State University Learning Models Working Group Report January 15, 2015 Executive Summary ­ (updated on March 19, 2015) Learning models within the Marine Studies that integrates marine literacy throughout OSU academic programs while expanding innovative marine education

  4. Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Office of Environmental Management Work Planning and Control Oversight. Contractor Good Practices and DOE EM Good Practices.

  5. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-02-14

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

  6. Critical Incident Stress Management (CISM): Group Crisis Intervention, 4th June 2006, International Critical Incident Stress Foundation, Inc.

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Critical Incident Stress Management (CISM): Group Crisis Intervention, 4th Edition, June 2006 Management (CISM): Group Crisis Intervention, 4th Edition, June 2006, International Critical Incident Stress

  7. Final report of the accident phenomenology and consequence (APAC) methodology evaluation. Spills Working Group

    SciTech Connect (OSTI)

    Brereton, S.; Shinn, J.; Hesse, D; Kaninich, D.; Lazaro, M.; Mubayi, V.

    1997-08-01

    The Spills Working Group was one of six working groups established under the Accident Phenomenology and Consequence (APAC) methodology evaluation program. The objectives of APAC were to assess methodologies available in the accident phenomenology and consequence analysis area and to evaluate their adequacy for use in preparing DOE facility safety basis documentation, such as Basis for Interim Operation (BIO), Justification for Continued Operation (JCO), Hazard Analysis Documents, and Safety Analysis Reports (SARs). Additional objectives of APAC were to identify development needs and to define standard practices to be followed in the analyses supporting facility safety basis documentation. The Spills Working Group focused on methodologies for estimating four types of spill source terms: liquid chemical spills and evaporation, pressurized liquid/gas releases, solid spills and resuspension/sublimation, and resuspension of particulate matter from liquid spills.

  8. Report on the NGS3 Working Group on Safeguards by Design For Aqueous Reprocessing Plants

    SciTech Connect (OSTI)

    Johnson, Shirley J.; Ehinger, Michael; Schanfein, Mark

    2011-02-01

    The objective of the Working Group on SBD for Aqueous Reprocessing Facilities was to provide recommendations, for facility operators and designers, which would aid in the coordination and integration of nuclear material accountancy and the safeguards requirements of all concerned parties - operators, state/regional authorities, and the IAEA. The recommendations, which are to be provided to the IAEA, are intended to assist in optimizing facility design and operating parameters to ensure the safeguardability of the facility while minimizing impact on the operations. The one day Working Group session addressed a wide range of design and operating topics.

  9. REPORT OF THE SNOWMASS M6 WORKING GROUP ON HIGH INTENSITY PROTON SOURCES.

    SciTech Connect (OSTI)

    CHOU,W.; WEI,J.

    2001-08-14

    The M6 working group had more than 40 active participants (listed in Section 4). During the three weeks at Snowmass, there were about 50 presentations, covering a wide range of topics associated with high intensity proton sources. The talks are listed in Section 5. This group also had joint sessions with a number of other working groups, including E1 (Neutrino Factories and Muon Colliders), E5 (Fixed-Target Experiments), M1 (Muon Based Systems), T4 (Particle Sources), T5 (Beam dynamics), T7 (High Performance Computing) and T9 (Diagnostics). The M6 group performed a survey of the beam parameters of existing and proposed high intensity proton sources, in particular, of the proton drivers. The results are listed in Table 1. These parameters are compared with the requirements of high-energy physics users of secondary beams in Working Groups E1 and E5. According to the consensus reached in the E1 and E5 groups, the U.S. HEP program requires an intense proton source, a 1-4 MW Proton Driver, by the end of this decade.

  10. From Awareness to TeamRooms, GroupWeb and TurboTurtle: Eight Snapshots of Recent Work in the

    E-Print Network [OSTI]

    Greenberg, Saul

    From Awareness to TeamRooms, GroupWeb and TurboTurtle: Eight Snapshots of Recent Work in the Group. and Cockburn, A. (1995) From Awareness to TeamRooms, GroupWeb and TurboTurtle: Eight Snapshots of Recent Work in the GroupLab Project. Research Report 95/580/32, Department of Computer Science, University of Calgary

  11. DISTRIBUTED SYSTEMS MANAGEMENT AS A GROUP ACTIVITY Graham Dean, Tom Rodden, Ian Sommerville and David Hutchison

    E-Print Network [OSTI]

    Sommerville, Ian

    commercial management packages provide low level information giving statistics on network load and trafficDISTRIBUTED SYSTEMS MANAGEMENT AS A GROUP ACTIVITY Graham Dean, Tom Rodden, Ian Sommerville@comp.lancs.ac.uk It is important to consider systems management as part of a whole organisational management strategy and, as such

  12. Service station requirements for safe use of hydrogen based fuels: NHA work group update

    SciTech Connect (OSTI)

    Coutts, D.A.

    1997-12-31

    This paper consists of viewgraphs which summarize the results of the meeting of the working group on safety standards. A standard for an odorant for hydrogen leak detection is set forth. Recent activities with the National Fire Protection Association and the International Standard Organization are enumerated. The path forward is also summarized.

  13. XML Warehousing Meets Sociology ...Introducing the W3C XQuery Working Group

    E-Print Network [OSTI]

    Senellart, Pierre

    , illustrated by the W3C XQuery Working Group. The novelty of our approach has many facets. Information-value information. This information is used to conduct a preliminary sociological analysis of the XQuery standardization process. Categories and Subject Descriptors J.4 [Social and Behavioral Sciences]: Computer

  14. NEWS RELEASE GOLDSPOTTED OAK BORER INTERAGENCY WORKING GROUP OF SAN DIEGO

    E-Print Network [OSTI]

    Ishida, Yuko

    NEWS RELEASE GOLDSPOTTED OAK BORER INTERAGENCY WORKING GROUP OF SAN DIEGO COUNTY CONTACT: Anabele Cornejo, Forest Service, 858-674-2985 Tammy Glenn, County of San Diego, 619-595-4627 Nick Schuler, CAL FIRE, 619-590-3100 DON'T MOVE OAK WOOD IN SAN DIEGO COUNTY! Dead, Dying, and Diseased Oaks

  15. Personalisation and Recommender Systems in Digital Joint NSF-EU DELOS Working Group Report

    E-Print Network [OSTI]

    Callan, Jamie

    Personalisation and Recommender Systems in Digital Libraries Joint NSF-EU DELOS Working Group, Ireland Micheline Beaulieu, University of Sheffield, UK Pia Borlund, Royal School of Library, University of Toronto, Canada Digital libraries are collections of information that have associated services

  16. A report of Working Group I of the Intergovernmental Panel on Climate Change

    E-Print Network [OSTI]

    Callender, Craig

    A report of Working Group I of the Intergovernmental Panel on Climate Change Summary Report of the Intergovernmental Panel on Climate Change [Solomon, S., D. Qin, M. Manning, Z. Chen, M is used to compare how a range of human and natural factors drive warming or cooling influences on global

  17. Les Houches 2011: Physics at TeV Colliders New Physics Working Group Report

    E-Print Network [OSTI]

    Brooijmans, G; Moortgat, F; Santiago, J; Skands, P; Vásquez, D Albornoz; Allanach, B C; Alloul, A; Arbey, A; Azatov, A; Baer, H; Balázs, C; Barr, A; Basso, L; Battaglia, M; Bechtle, P; Bélanger, G; Belyaev, A; Benslama, K; Bergström, L; Bharucha, A; Boehm, C; Bondarenko, M; Bondu, O; Boos, E; Boudjema, F; Bringmann, T; Brown, M; Bunichev, V; Calvet, S; Campanelli, M; Carmona, A; Cerdeño, D G; Chala, M; Chivukula, R S; Chowdhury, D; Christensen, N D; Cirelli, M; Cox, S; Cranmer, K; Da Silva, J; Delahaye, T; De Roeck, A; Djouadi, A; Dobson, E; Dolan, M; Donato, F; La Rochelle, G Drieu; Duda, G; Duhr, C; Dumont, B; Edsjö, J; Ellis, J; Evoli, C; Falkowski, A; Felcini, M; Fuks, B; Gabrielli, E; Gaggero, D; Gascon-Shotkin, S; Ghosh, D K; Giammanco, A; Godbole, R M; Gondolo, P; Goto, T; Grasso, D; Gris, P; Guadagnoli, D; Gunion, J F; Haisch, U; Hartgring, L; Heinemeyer, S; Hirsch, M; Hewett, J; Ismail, A; Jeltema, T; Kadastik, M; Kakizaki, M; Kannike, K; Khalil, S; Kneur, J-L; Krämer, M; Kraml, S; Kreiss, S; Lavalle, J; Leane, R; Lykken, J; Maccione, L; Mahmoudi, F; Mangano, M; Martin, S P; Maurin, D; Moreau, G; Moretti, S; Moskalenko, I; Moultaka, G; Muhlleitner, M; Niessen, I; O'Leary, B; Orlando, E; Panci, P; Polesello, G; Porod, W; Porter, T; Profumo, S; Prosper, H; Pukhov, A; Racioppi, A; Raidal, M; de Traubenberg, M Rausch; Renaud, A; Reuter, J; Rizzo, T G; Robens, T; Rodríguez-Marrero, A Y; Salati, P; Savage, C; Scott, P; Sekmen, S; Semenov, A; Shan, C -L; Shepherd-Themistocleous, C; Simmons, E H; Slavich, P; Speckner, C; Staub, F; Strong, A; Taillet, R; Thomas, F S; Thomas, M C; Tomalin, I; Tytgat, M; Ughetto, M; Valéry, L; Walker, D G E; Weiler, A; West, S M; White, C D; Williams, A J; Wingerter, A; Wymant, C; Yu, J -H; Yuan, C -P; Zerwas, D

    2012-01-01

    We present the activities of the "New Physics" working group for the "Physics at TeV Colliders" workshop (Les Houches, France, 30 May-17 June, 2011). Our report includes new agreements on formats for interfaces between computational tools, new tool developments, important signatures for searches at the LHC, recommendations for presentation of LHC search results, as well as additional phenomenological studies.

  18. Les Houches 2011: Physics at TeV Colliders New Physics Working Group Report

    E-Print Network [OSTI]

    G. Brooijmans; B. Gripaios; F. Moortgat; J. Santiago; P. Skands; D. Albornoz Vásquez; B. C. Allanach; A. Alloul; A. Arbey; A. Azatov; H. Baer; C. Balázs; A. Barr; L. Basso; M. Battaglia; P. Bechtle; G. Bélanger; A. Belyaev; K. Benslama; L. Bergström; A. Bharucha; C. Boehm; M. Bondarenko; O. Bondu; E. Boos; F. Boudjema; T. Bringmann; M. Brown; V. Bunichev; S. Calvet; M. Campanelli; A. Carmona; D. G. Cerdeño; M. Chala; R. S. Chivukula; D. Chowdhury; N. D. Christensen; M. Cirelli; S. Cox; K. Cranmer; J. Da Silva; T. Delahaye; A. De Roeck; A. Djouadi; E. Dobson; M. Dolan; F. Donato; G. Drieu La Rochelle; G. Duda; C. Duhr; B. Dumont; J. Edsjö; J. Ellis; C. Evoli; A. Falkowski; M. Felcini; B. Fuks; E. Gabrielli; D. Gaggero; S. Gascon-Shotkin; D. K. Ghosh; A. Giammanco; R. M. Godbole; P. Gondolo; T. Goto; D. Grasso; P. Gris; D. Guadagnoli; J. F. Gunion; U. Haisch; L. Hartgring; S. Heinemeyer; M. Hirsch; J. Hewett; A. Ismail; T. Jeltema; M. Kadastik; M. Kakizaki; K. Kannike; S. Khalil; J-L. Kneur; M. Krämer; S. Kraml; S. Kreiss; J. Lavalle; R. Leane; J. Lykken; L. Maccione; F. Mahmoudi; M. Mangano; S. P. Martin; D. Maurin; G. Moreau; S. Moretti; I. Moskalenko; G. Moultaka; M. Muhlleitner; I. Niessen; B. O'Leary; E. Orlando; P. Panci; G. Polesello; W. Porod; T. Porter; S. Profumo; H. Prosper; A. Pukhov; A. Racioppi; M. Raidal; M. Rausch de Traubenberg; A. Renaud; J. Reuter; T. G. Rizzo; T. Robens; A. Y. Rodríguez-Marrero; P. Salati; C. Savage; P. Scott; S. Sekmen; A. Semenov; C. -L. Shan; C. Shepherd-Themistocleous; E. H. Simmons; P. Slavich; C. Speckner; F. Staub; A. Strong; R. Taillet; F. S. Thomas; M. C. Thomas; I. Tomalin; M. Tytgat; M. Ughetto; L. Valéry; D. G. E. Walker; A. Weiler; S. M. West; C. D. White; A. J. Williams; A. Wingerter; C. Wymant; J. -H. Yu; C. -P. Yuan; D. Zerwas

    2012-04-20

    We present the activities of the "New Physics" working group for the "Physics at TeV Colliders" workshop (Les Houches, France, 30 May-17 June, 2011). Our report includes new agreements on formats for interfaces between computational tools, new tool developments, important signatures for searches at the LHC, recommendations for presentation of LHC search results, as well as additional phenomenological studies.

  19. 0 1,000 2,000 an independent group working on the genetic

    E-Print Network [OSTI]

    Stocker, Thomas

    that are linked to mitochondrial dysfunction and oxidative stress, such as Parkinson's disease. Therefore, fineEDML Dome F Dome C 0 1,000 2,000 Vostok km 70°S 80°S an independent group working on the genetic

  20. A Proposed Faculty Salary System Members of the president's faculty salary policy working group

    E-Print Network [OSTI]

    Van Volkenburgh, Elizabeth

    A Proposed Faculty Salary System Members of the president's faculty salary policy working group prepared by Jack Lee, December 4, 2014 #12;The 2000 Faculty Salary System "The fundamental purpose of the University of Washington Faculty Salary Policy is to allow the University to recruit and retain the best

  1. Organizing Women in Physics Working Groups Corinna Kausch, Gillian Butcher, Marcia Barbosa, and Rachel Ivie

    E-Print Network [OSTI]

    Barbosa, Marcia C. B.

    Organizing Women in Physics Working Groups Corinna Kausch, Gillian Butcher, Marcia Barbosa://proceedings.aip.org/dbt/dbt.jsp?KEY=APCPCS&Volume=1119&Issue=1 Published by the American Institute of Physics. Related Articles Ten years ago: Jul/Aug 1988 Comput. Phys. 12, 311 (1998) CIP Website Online version enhances article on computational physics

  2. Marine Studies Initiative (MSI) Research Working Group Report (draft) I. Overview and Motivation for MSI Research

    E-Print Network [OSTI]

    Tullos, Desiree

    1 Marine Studies Initiative (MSI) Research Working Group Report (draft) I. Overview and Motivation connected to the world's ocean and marine environment. For centuries oceans have provided jobs, goods. As much as oceans and the marine environment have shaped human culture, we have effected them. The Oregon

  3. Working Woodlands: Public Demand, Owner Management, and Government

    E-Print Network [OSTI]

    , including environmental and self-consumption values. Work in California has revealed that self-consumption

  4. Managing work-life policies in the European workplace: explorations for future research 

    E-Print Network [OSTI]

    den Dulk, Laura; Peper, Bram

    2009-01-01

    In this paper we focus on the implementation and management of work-life policies in the workplace and the key role of managers in this context. We review the existing literature, enabling us to set a research agenda focused ...

  5. Working lives of prison managers: exploring agency and structure in the late modern prison 

    E-Print Network [OSTI]

    Bennett, Jamie Stewart

    2012-11-27

    This study explores the contemporary working lives of prison managers. It attempts to understand the ways in which globalised changes in management practices have intersected with localised practices and occupational ...

  6. Support Groups, Marriage, and the Management of Ambiguity among HIV-Positive Women in Northern Nigeria

    E-Print Network [OSTI]

    Rhine, Kathryn Angela

    2009-03-01

    -positive women in northern Nigeria have appropriated a support group to facilitate their marriage arrangements. In this group, women negotiate the threats of stigma and the promises of respectable marriage through what I call the management of ambiguity...

  7. Technology adaptation and boundary management in bona fide virtual groups

    E-Print Network [OSTI]

    Zhang, Huiyan

    2006-04-12

    and norms of media combination and media use. Group boundaries were preserved when the influence of outgroup members were constrained through media use, such as excluding them from team conference calls, filtering messages from external groups or members...

  8. Steve N. Economou Managing Director, Curtis Financial Group, LLC

    E-Print Network [OSTI]

    Sibille, Etienne

    buyouts and financial opinions including fairness and valuation opinions. He has completed hundreds direct investments in emerging growth technology companies and management buyouts. He was also

  9. Working Group Presentations | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLosThe23-24, 2011Science (SC)ScienceWest VirginiaWorking Group

  10. Working Group Reports Calibration of Radiation Codes Used in Climate Models:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricNCubictheThepresented in1: Model or Working Group97

  11. Working Group Reports Summary of Single-Column Model Intensive Observation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricNCubictheThepresented in1: Model or Working Group97

  12. Summary report of working group 3: High gradient and laser-structure based acceleration

    SciTech Connect (OSTI)

    Solyak, N.; Cowan, B.M.; /Tech-X, Boulder

    2010-01-01

    The charge for the working group on high gradient and laser-structure based acceleration was to assess the current challenges involved in developing an advanced accelerator based on electromagnetic structures, and survey state-of-the-art methods to address those challenges. The topics of more than 50 presentations in the working group covered a very broad range of issues, from ideas, theoretical models and simulations, to design and manufacturing of accelerating structures and, finally, experimental results on obtaining extremely high accelerating gradients in structures from conventional microwave frequency range up to THz and laser frequencies. Workshop discussion topics included advances in the understanding of the physics of breakdown and other phenomena, limiting high gradient performance of accelerating structures. New results presented in this workshop demonstrated significant progress in the fields of conventional vacuum structure-based acceleration, dielectric wakefield acceleration, and laser-structure acceleration.

  13. July 2004 Working Group Meeting on Heavy Vehicle Aerodynamic Drag: Presentation, Summary of Comments, and Conclusions

    SciTech Connect (OSTI)

    McCallen, R; Salari, K; Ortega, J; Castellucci, P; Eastwood, C; DeChant, L; Hassan, B; Browand, F; Arcas, D; Ross, J; Heineck, J; Storms, B; Walker, S; Leonard, A; Roy, C; Whitfield, D; Pointer, D; Sofu, T; Englar, R; Funk, R

    2004-08-17

    A Working Group Meeting on Heavy Vehicle Aerodynamic Drag was held in Portland, Oregon on July 1, 2004. The purpose of the meeting was to provide a summary of achievements, discuss pressing issues, present a general overview of future plans, and to provide a forum for dialogue with the Department of Energy (DOE) and industry representatives. The meeting was held in Portland, because the DOE Aero Team participated in an exclusive session on Heavy Truck Vehicle Aerodynamic Drag at the 34th AIAA Fluid Dynamics Conference and Exhibit in Portland on the morning of July 1st, just preceding our Working Group meeting. Even though the paper session was on the last day of the Conference, the Team presented to a full room of interested attendees.

  14. Philosophy 148 --Assignment #4 This assignment is due Thursday, April 17 at 3pm. If you work in a group, list your group members at the

    E-Print Network [OSTI]

    Fitelson, Branden

    work in a group, list your group members at the top of your submitted work. Hempel's Desiderata algebra B of propositions. Consider the following seven conditions that might be met by a confirmation of contingent propositions drawn from some Boolean algebra B ­ that satisfies six out of the seven conditions

  15. Group Dynamics in a Security Risk Management Team Context: A Teaching Case Study

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Group Dynamics in a Security Risk Management Team Context: A Teaching Case Study Rostyslav-up of security risk management teams and their performance. Three different models were used to construct team security risk management tasks. The study has shown that there is a possible correlation between the teams

  16. University of Bath Carbon Management Plan working with

    E-Print Network [OSTI]

    Burton, Geoffrey R.

    at Stake 20 4 Carbon Management Projects 23 4.1 Existing projects 24 4.2 District heating projects 25 4 Department for Environment, Food and Rural Affairs DH District Heating DTI Department of Trade and Industry Building Research Establishment Environmental Assessment Method CHP Combined Heat and Power CCL Climate

  17. Legacy Management Work Progresses on Defense-Related Uranium...

    Broader source: Energy.gov (indexed) [DOE]

    (LM) continues to work on a report to Congress regarding defense-related legacy uranium mines. LM was directed by the U.S. Congress in the National Defense Authorization Act...

  18. SEAS Finance Responsibilities Grid Name Team Extension Title Primary Responsibilties/additional work Groups Serviced

    E-Print Network [OSTI]

    Chen, Yiling

    , reimbursements, Accounts Payable, Airgas, student organizations, Notary public Applied Physics, Environmental Manages Accounting, Financial Operations, and Payroll teams. Stratgic decision making support, special Manager of Accounting Manages Accounting Team. Quarterly and year-end closes, manage quarterly transfers

  19. 2014-06-09 Issuance: Manufactured Housing Working Group; Notice of Intent

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register? notice of intent to establish the manufactured housing working group to negotiate a notice of proposed rulemaking for energy efficiency standards for manufactured housing, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 9, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  20. Higgs Working Group Report of the Snowmass 2013 Community Planning Study

    E-Print Network [OSTI]

    S. Dawson; A. Gritsan; H. Logan; J. Qian; C. Tully; R. Van Kooten; A. Ajaib; A. Anastassov; I. Anderson; D. Asner; O. Bake; V. Barger; T. Barklow; B. Batell; M. Battaglia; S. Berge; A. Blondel; S. Bolognesi; J. Brau; E. Brownson; M. Cahill-Rowley; C. Calancha-Paredes; C. -Y. Chen; W. Chou; R. Clare; D. Cline; N. Craig; K. Cranmer; M. de Gruttola; A. Elagin; R. Essig; L. Everett; E. Feng; K. Fujii; J. Gainer; Y. Gao; I. Gogoladze; S. Gori; R. Goncalo; N. Graf; C. Grojean; S. Guindon; H. Haber; T. Han; G. Hanson; R. Harnik; S. Heinemeyer; U. Heintz; J. Hewett; Y. Ilchenko; A. Ishikawa; A. Ismail; V. Jain; P. Janot; S. Kanemura; S. Kawada; R. Kehoe; M. Klute; A. Kotwal; K. Krueger; G. Kukartsev; K. Kumar; J. Kunkle; M. Kurata; I. Lewis; Y. Li; L. Linssen; E. Lipeles; R. Lipton; T. Liss; J. List; T. Liu; Z. Liu; I. Low; T. Ma; P. Mackenzie; B. Mellado; K. Melnikov; A. Miyamoto; G. Moortgat-Pick; G. Mourou; M. Narain; H. Neal; J. Nielsen; N. Okada; H. Okawa; J. Olsen; H. Ono; P. Onyisi; N. Parashar; M. Peskin; F. Petriello; T. Plehn; C. Pollard; C. Potter; K. Prokofiev; M. Rauch; T. Rizzo; T. Robens; V. Rodriguez; P. Roloff; R. Ruiz; V. Sanz; J. Sayre; Q. Shafi; G. Shaughnessy; M. Sher; F. Simon; N. Solyak; J. Strube; J. Stupak; S. Su; T. Suehara; T. Tanabe; T. Tajima; V. Telnov; J. Tian; S. Thomas; M. Thomson; K. Tsumura; C. Un; M. Velasco; C. Wagner; S. Wang; S. Watanuki; G. Weiglein; A. Whitbeck; K. Yagyu; W. Yao; H. Yokoya; S. Zenz; D. Zerwas; Y. Zhang; Y. Zhou

    2014-01-08

    This report summarizes the work of the Energy Frontier Higgs Boson working group of the 2013 Community Summer Study (Snowmass). We identify the key elements of a precision Higgs physics program and document the physics potential of future experimental facilities as elucidated during the Snowmass study. We study Higgs couplings to gauge boson and fermion pairs, double Higgs production for the Higgs self-coupling, its quantum numbers and $CP$-mixing in Higgs couplings, the Higgs mass and total width, and prospects for direct searches for additional Higgs bosons in extensions of the Standard Model. Our report includes projections of measurement capabilities from detailed studies of the Compact Linear Collider (CLIC), a Gamma-Gamma Collider, the International Linear Collider (ILC), the Large Hadron Collider High-Luminosity Upgrade (HL-LHC), Very Large Hadron Colliders up to 100 TeV (VLHC), a Muon Collider, and a Triple-Large Electron Positron Collider (TLEP).

  1. Working Group 7.0 Environmental Transport and Health Effects, Chernobyl Studies Project. Progress report, October 1994 -- March 1995

    SciTech Connect (OSTI)

    Anspaugh, L.R.; Hendrickson, S.M.

    1995-06-01

    This document presents the details from the working group 7.0 Chernobyl Studies Project. This working group looked at the environmental transport and health effects from the fallout due to the meltdown of Chernobylsk-4 reactor. Topics include: hydrological transport; chromosome painting dosimetry; EPR, TL and OSL dosimetry; stochastic effects; thyroid studies; and leukemia studies.

  2. GSDI Legal and Economic Working Group: A Template for Reporting National Legal and Economic Issues Affecting Spatial Data

    E-Print Network [OSTI]

    Onsrud, Harlan J.

    GSDI Legal and Economic Working Group: A Template for Reporting National Legal and Economic Issues Affecting Spatial Data Infrastructure Developments The primary objective of the GSDI Legal and Economic Working Group is to open communication channels and encourage dialogue regarding the legal and economic

  3. Semi-Annual Report on Work Supporting the International Forum for Reactor Aging Management (IFRAM)

    SciTech Connect (OSTI)

    Bond, Leonard J.; Brenchley, David L.

    2011-11-30

    During the first six months of this project, Pacific Northwest National Laboratory has provided planning and leadership support for the establishment of the International Forum for Reactor Aging Management (IFRAM). This entailed facilitating the efforts of the Global Steering Committee to prepare the charter, operating guidelines, and other documents for IFRAM. It also included making plans for the Inaugural meeting and facilitating its success. This meeting was held on August 4 5, 2011, in Colorado Springs, Colorado. Representatives from Asia, Europe, and the United States met to share information on reactor aging management and to make plans for the future. Professor Tetsuo Shoji was elected chairperson of the Leadership Council. This kick-off event transformed the dream of an international forum into a reality. On August 4-5, 2011, IFRAM began to achieve its mission. The work completed successfully during this period was built upon important previous efforts. This included the development of a proposal for establishing IFRAM and engaging experts in Asia and Europe. The proposal was presented at Engagement workshops in Seoul, Korea (October 2009) and Petten, The Netherlands (May 2010). Participants in both groups demonstrated strong interest in the establishment of IFRAM. Therefore, the Global Steering Committee was formed to plan and carry out the start-up of IFRAM in 2011. This report builds on the initial activities and documents the results of activities over the last six months.

  4. DOE - Office of Legacy Management -- Armour Fertilizer Works - FL 01

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth Dakota Edgemont, South Dakota,You areFertilizer Works - FL 01

  5. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    SciTech Connect (OSTI)

    Jacobsen, P.H.

    1997-09-23

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  6. Working group meeting on heavy vehicle aerodynamic drag: presentations and summary of comments and conclusion

    SciTech Connect (OSTI)

    Browand, F; Gutierrez, W; Leonard, A; McBride, D; McCallen, R; Ross, J; Roth, K; Rutledge, W; Salari, K

    1998-09-28

    The first Working Group Meeting on Heavy Vehicle Aerodynamic Drag was held at Sandia National Laboratories (SNL) in Albuquerque, New Mexico on August 28, 1998. The purpose of the meeting was to review the proposed Multi-Year Program Plan (MYPP) and provide an update on the Group"s progress. In addition, the technical details of each organization"s activities were presented and discussed. Presentations were given by representatives from the Department of Energy (DOE) Office of Transportation Technology Office of Heavy Vehicle Technology (OHVT), Lawrence Livermore National Laboratory (LLNL), SNL, University of Southern California (USC), California Institute of Technology (Caltech), and NASA Ames Research Center. These presenters are part of a DOE appointed Technical Team assigned to developing the MYPP. The goal of the MYPP is to develop and demonstrate the ability to simulate and analyze aerodynamic flow around heavy truck vehicles using existing and advanced computational tools (A Multi-Year Program Plan for the Aerodynamic Design of Heavy Vehicles, R. McCallen, D. McBride, W. Rutledge, F. Browand, A. Leonard, .I. Ross, UCRL-PROP- 127753 Dr. Rev 2, May 1998). This report contains the technical presentations (viewgraphs) delivered at the Meeting, briefly summarizes the comments and conclusions from the Meeting participants, and outlines the future actions.

  7. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    SciTech Connect (OSTI)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  8. Top Management Group Pay Disparities and Subsequent Firm Performance: The Effect of Powerful CEOs

    E-Print Network [OSTI]

    McClelland, Patrick Lyn

    2008-05-21

    (OLS) regression and structured equation modeling (SEM) techniques. Results indicate that CEO power plays an important role in the distribution of compensation within top management groups and the extent to which pay is disparate. Further, results show...

  9. Final Report. An Integrated Partnership to Create and Lead the Solar Codes and Standards Working Group

    SciTech Connect (OSTI)

    Rosenthal, Andrew

    2013-12-30

    The DOE grant, “An Integrated Partnership to Create and Lead the Solar Codes and Standards Working Group,” to New Mexico State University created the Solar America Board for Codes and Standards (Solar ABCs). From 2007 – 2013 with funding from this grant, Solar ABCs identified current issues, established a dialogue among key stakeholders, and catalyzed appropriate activities to support the development of codes and standards that facilitated the installation of high quality, safe photovoltaic systems. Solar ABCs brought the following resources to the PV stakeholder community; Formal coordination in the planning or revision of interrelated codes and standards removing “stove pipes” that have only roofing experts working on roofing codes, PV experts on PV codes, fire enforcement experts working on fire codes, etc.; A conduit through which all interested stakeholders were able to see the steps being taken in the development or modification of codes and standards and participate directly in the processes; A central clearing house for new documents, standards, proposed standards, analytical studies, and recommendations of best practices available to the PV community; A forum of experts that invites and welcomes all interested parties into the process of performing studies, evaluating results, and building consensus on standards and code-related topics that affect all aspects of the market; and A biennial gap analysis to formally survey the PV community to identify needs that are unmet and inhibiting the market and necessary technical developments.

  10. Managing water demand as a regulated open MAS. (Work in progress)

    E-Print Network [OSTI]

    Garrido, Antonio

    1 Managing water demand as a regulated open MAS. (Work in progress) Vicente Botti 1 , Antonio Scientific Research Council, {vbotti,agarridot,agiret}@dsic.upv.es, pablo@iiia.csic.es I. WATER MANAGEMENT of water policy is the need to foster a more rational use of the resource and this may be addressed

  11. Managing water demand as a regulated open MAS. (Work in progress)

    E-Print Network [OSTI]

    Garrido, Antonio

    1 Managing water demand as a regulated open MAS. (Work in progress) Vicente Botti1 , Antonio Scientific Research Council, {vbotti,agarridot,agiret}@dsic.upv.es, pablo@iiia.csic.es I. WATER MANAGEMENT of water policy is the need to foster a more rational use of the resource and this may be addressed

  12. A sustainable urban logistics dashboard from the perspective of a group of logistics managers

    E-Print Network [OSTI]

    Boyer, Edmond

    A sustainable urban logistics dashboard from the perspective of a group of logistics managers Laboratoire d'Economie des Transports, Lyon, France Abstract Urban logistics has now become a priority issue logistics managers, one of the categories of stakeholders given less consideration by public authorities

  13. SUMMARY OF GENERAL WORKING GROUP A+B+D: CODES BENCHMARKING.

    SciTech Connect (OSTI)

    WEI, J.; SHAPOSHNIKOVA, E.; ZIMMERMANN, F.; HOFMANN, I.

    2006-05-29

    Computer simulation is an indispensable tool in assisting the design, construction, and operation of accelerators. In particular, computer simulation complements analytical theories and experimental observations in understanding beam dynamics in accelerators. The ultimate function of computer simulation is to study mechanisms that limit the performance of frontier accelerators. There are four goals for the benchmarking of computer simulation codes, namely debugging, validation, comparison and verification: (1) Debugging--codes should calculate what they are supposed to calculate; (2) Validation--results generated by the codes should agree with established analytical results for specific cases; (3) Comparison--results from two sets of codes should agree with each other if the models used are the same; and (4) Verification--results from the codes should agree with experimental measurements. This is the summary of the joint session among working groups A, B, and D of the HI32006 Workshop on computer codes benchmarking.

  14. Summary for Policymakers IPCC Fourth Assessment Report, WorkingGroup III

    SciTech Connect (OSTI)

    Barker, Terry; Bashmakov, Igor; Bernstein, Lenny; Bogner,Jean; Bosch, Peter; Dave, Rutu; Davidson, Ogunlade; Fisher, Brian; Grubb,Michael; Gupta, Sujata; Halsnaes, Kirsten; Heij, Bertjan; Kahn Ribeiro,Suzana; Kobayashi, Shigeki; Levine, Mark; Martino, Daniel; MaseraCerutti, Omar; Metz, Bert; Meyer, Leo; Nabuurs, Gert-Jan; Najam, Adil; Nakicenovic, Nebojsa; Rogner, Hans Holger; Roy, Joyashree; Sathaye,Jayant; Schock, Robert; Shukla, Priyaradshi; Sims, Ralph; Smith, Pete; Swart, Rob; Tirpak, Dennis; Urge-Vorsatz, Diana; Zhou, Dadi

    2007-04-30

    A. Introduction 1. The Working Group III contribution to theIPCC Fourth Assessment Report (AR4) focuses on new literature on thescientific, technological, environmental, economic and social aspects ofmitigation of climate change, published since the IPCC Third AssessmentReport (TAR) and the Special Reports on COB2B Capture and Storage (SRCCS)and on Safeguarding the Ozone Layer and the Global Climate System (SROC).The following summary is organised into six sections after thisintroduction: - Greenhouse gas (GHG) emission trends, - Mitigation in theshort and medium term, across different economic sectors (until 2030), -Mitigation in the long-term (beyond 2030), - Policies, measures andinstruments to mitigate climate change, - Sustainable development andclimate change mitigation, - Gaps in knowledge. References to thecorresponding chapter sections are indicated at each paragraph in squarebrackets. An explanation of terms, acronyms and chemical symbols used inthis SPM can be found in the glossary to the main report.

  15. New UC ANR working group to address residual material from anaerobic digesters

    E-Print Network [OSTI]

    Downing, Jim

    2015-01-01

    waste management strategy in California, with over 200 facilities operating and more under construction.

  16. Working group meeting on heavy vehicle aerodynamic drag: presentations and summary of comments and

    SciTech Connect (OSTI)

    Browand, F; Gutierrez, W; Leonard, A; McBride, D; McCallen, R; Ross, J; Roth, K; Rutledge, W; Salari, K.

    1998-09-28

    The first Working Group Meeting on Heavy Vehicle Aerodynamic Drag was held at Sandia National Laboratories (SNL) in Albuquerque, New Mexico on August 28, 1998. The purpose of the meeting was to review the proposed Multi-Year Program Plan (MYPP) and provide an update on the Group s progress. In addition, the technical details of each organization s activities were presented and discussed. Presentations were given by representatives from the Department of Energy (DOE) Office of Transportation Technology Office of Heavy Vehicle Technology (OHVT), Lawrence Livermore National Laboratory (LLNL), SNL, University of Southern California (USC), California Institute of Technology (Caltech), and NASA Ames Research Center. These presenters are part of a DOE appointed Technical Team assigned to developing the MYPP. The goal of the MYPP is to develop and demonstrate the ability to simulate and analyze aerodynamic flow around heavy truck vehicles using existing and advanced computational tools (A Multi-Year Program Plan for the Aerodynamic Design of Heavy Vehicles, R. McCallen, D. McBride, W. Rutledge, F. Browand, A. Leonard, .I. Ross, UCRL-PROP- 127753 Dr. Rev 2, May 1998). This report contains the technical presentations (viewgraphs) delivered at the Meeting, briefly summarizes the comments and conclusions from the Meeting participants, and outlines the future actions.

  17. Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development

    Broader source: Energy.gov [DOE]

    Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

  18. Establishment of Working Group* for the Reform of Engineering Training and Research and aligning it with Maharashtra's Development Needs**.

    E-Print Network [OSTI]

    Sohoni, Milind

    Establishment of Working Group* for the Reform of Engineering Training and Research and aligning in the reform program. 6. To conduct research and to make concrete recommendations to the following activities

  19. Digital Creation and Preservation Working Group Plan and oversee implementation for the Libraries' digital preservation program, particularly in relation

    E-Print Network [OSTI]

    Schweik, Charles M.

    for the Libraries' digital preservation program, particularly in relation to the Libraries' unique resources to the Digital Strategies Group. Chair: Appointed by the Director of Libraries Membership: Members serveDigital Creation and Preservation Working Group Charge: Plan and oversee implementation

  20. TITLE: Guidelines for Scheduled Work Management Flow within ITS Information Technology Services Standards, Practices and Policies (SP&Ps)

    E-Print Network [OSTI]

    Hamburger, Peter

    TITLE: Guidelines for Scheduled Work Management Flow within ITS Information Technology Services _________ Mike Kanning _________ Cynthia Elick _________ Summary: Policy describes how IT Services manages Schedule, monitored for progress and customers kept informed. 4.0 Practice 4.1 Scheduled Work Management

  1. IDENTITY AND ACCESS MANAGEMENT -GOVERNANCE AND POLICY FOCUS GROUP POLICY GAP ANALYSIS

    E-Print Network [OSTI]

    Maroncelli, Mark

    and ITS policies including this policy. Written Acknowledgment includes image data base form from the PennIDENTITY AND ACCESS MANAGEMENT - GOVERNANCE AND POLICY FOCUS GROUP POLICY GAP ANALYSIS Issue Policy systems that use this Userid for authentication and authorization. Life Cycle-Affiliations Definition

  2. AGS SUPER NEUTRINO BEAM FACILITY ACCELERATOR AND TARGET SYSTEM DESIGN (NEUTRINO WORKING GROUP REPORT-II).

    SciTech Connect (OSTI)

    DIWAN,M.; MARCIANO,W.; WENG,W.; RAPARIA,D.

    2003-04-21

    This document describes the design of the accelerator and target systems for the AGS Super Neutrino Beam Facility. Under the direction of the Associate Laboratory Director Tom Kirk, BNL has established a Neutrino Working Group to explore the scientific case and facility requirements for a very long baseline neutrino experiment. Results of a study of the physics merit and detector performance was published in BNL-69395 in October 2002, where it was shown that a wide-band neutrino beam generated by a 1 MW proton beam from the AGS, coupled with a half megaton water Cerenkov detector located deep underground in the former Homestake mine in South Dakota would be able to measure the complete set of neutrino oscillation parameters: (1) precise determination of the oscillation parameters {Delta}m{sub 32}{sup 2} and sin{sup 2} 2{theta}{sub 32}; (2) detection of the oscillation of {nu}{sub {mu}}-{nu}{sub e} and measurement of sin{sup 2} 2{theta}{sub 13}; (3) measurement of {Delta}m{sub 21}{sup 2} sin 2{theta}{sub 12} in a {nu}{sub {mu}} {yields} {nu}{sub e} appearance mode, independent of the value of {theta}{sub 13}; (4) verification of matter enhancement and the sign of {Delta}m{sub 32}{sup 2}; and (5) determination of the CP-violation parameter {delta}{sub CP} in the neutrino sector. This report details the performance requirements and conceptual design of the accelerator and the target systems for the production of a neutrino beam by a 1.0 MW proton beam from the AGS. The major components of this facility include a new 1.2 GeV superconducting linac, ramping the AGS at 2.5 Hz, and the new target station for 1.0 MW beam. It also calls for moderate increase, about 30%, of the AGS intensity per pulse. Special care is taken to account for all sources of proton beam loss plus shielding and collimation of stray beam halo particles to ensure equipment reliability and personal safety. A preliminary cost estimate and schedule for the accelerator upgrade and target system are also included.

  3. CSEWG SYMPOSIUM, A CSWEG RETROSPECTIVE. 35TH ANNIVERSARY CROSS SECTION EVALUATION WORKING GROUP, NOV. 5, 2001, BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect (OSTI)

    DUNFORD, C.; HOLDEN, N.; PEARLSTEIN, S.

    2001-11-05

    This publication has been prepared to record some of the history of the Cross Section Evaluation Working Group (CSEWG). CSEWG is responsible for creating the evaluated nuclear data file (ENDF/B) which is widely used by scientists and engineers who are involved in the development and maintenance of applied nuclear technologies. This organization has become the model for the development of nuclear data libraries throughout the world. The data format (ENDF) has been adopted as the international standard. On November 5, 2001, a symposium was held at Brookhaven National Laboratory to celebrate the 50 th meeting of the CSEWG organization and the 35 th anniversary of its first meeting in November 1966. The papers presented in this volume were prepared by present and former CSEWG members for presentation at the November 2001 symposium. All but two of the presentations are included. I have included an appendix to list all of the CSEWG members and their affiliations, which has been compiled from the minutes of each of the CSEWG meetings. Minutes exist for all meetings except the 4 th meeting held in January 1968. The list includes 348 individuals from 71 organizations. The dates for each of the 50 CSEWG meetings are listed. The committee structure and chairmen of all committees and subcommittees are also included in the appendix. This volume is dedicated to three individuals whose foresight and talents made CSEWG possible and successful. They are Henry Honeck who lead the effort to develop the ENDF format and the CSEWG system, Ira Zartman, the Atomic Energy Commission program manager who provided the programmatic direction and support, and Sol Pearlstein who led the development of the CESWG organization and the ENDF/B evaluated nuclear data library.

  4. Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group (BILIWG) Kick-Off Meeting Proceedings Hilton Garden Inn-BWI,Baltimore, MD October 24, 2006

    Broader source: Energy.gov [DOE]

    Proceedings from the October 24, 2006 Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group Kick-Off Meeting.

  5. ISSUANCE 2015-08-21: Energy Efficiency Program for Commercial and Industrial Equipment: Notice of Open Meetings for the Fans and Blowers Working Group

    Broader source: Energy.gov [DOE]

    Energy Efficiency Program for Commercial and Industrial Equipment: Notice of Open Meetings for the Fans and Blowers Working Group

  6. ISSUANCE 2015-10-07: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings Regarding The Dedicated Purpose Pool Pumps Working Group

    Broader source: Energy.gov [DOE]

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings Regarding The Dedicated Purpose Pool Pumps Working Group

  7. Les Houches Physics at TeV Colliders 2005 Beyond the Standard Model Working Group: Summary Report

    SciTech Connect (OSTI)

    Allanach, B.C.; Grojean, C.; Skands, P.; Accomando, E.; Azuelos, G.; Baer, H.; Balazs, C.; Belanger, G.; Benakli, K.; Boudjema, F.; Brelier, B.; Bunichev, V.; Cacciapaglia, G.; Carena, M.; Choudhury, D.; Delsart, P.-A.; De Sanctis, U.; Desch, K.; Dobrescu, B.A.; Dudko, L.; El Kacimi, M.; /Saclay, SPhT /CERN /Fermilab /INFN, Turin /Turin U. /Montreal U. /TRIUMF /Florida State U. /Argonne /Annecy, LAPTH /Paris, LPTHE /Moscow State U. /Cornell U., CIHEP /Delhi U. /Milan U. /INFN, Milan /Freiburg U. /Cadi Ayyad U., Marrakech /Orsay, LPT /Oslo U. /Lancaster U.

    2006-03-17

    The work contained herein constitutes a report of the ''Beyond the Standard Model'' working group for the Workshop ''Physics at TeV Colliders'', Les Houches, France, 2-20 May, 2005. We present reviews of current topics as well as original research carried out for the workshop. Supersymmetric and non-supersymmetric models are studied, as well as computational tools designed in order to facilitate their phenomenology.

  8. Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

    SciTech Connect (OSTI)

    Doyle, C.; Truitt, A.; Inda, D.; Lawrence, R.; Lockhart, R.; Golden, M.

    2015-03-01

    The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligence activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.

  9. Working Group Meeting Presentation Guidance at a Glance Distributed Reforming of Biomass Pyrolysis Oils

    E-Print Network [OSTI]

    and Performance Carbon Deposit Removal and Catalyst Regeneration Management Process Energy Integration Integrated and 7 2007 R. J. Evans, NREL D. M. Steward, NREL #12;Innovation / Overview Biomass pyrolysis produces.31 O2 + 0.26 H2O 0.71 CO2 + 0.96 H2 #12;Key Performance Metrics Catalytic Steam Reforming of Bio

  10. The XV-th Meeting of European Working Group on Acoustic emission FRACTURE MECHANISMS IN SINGLE CRYSTAL COMPOSITES

    E-Print Network [OSTI]

    Wadley, Haydn

    The XV-th Meeting of European Working Group on Acoustic emission FRACTURE MECHANISMS IN SINGLE of Standards Gaithersburg, Maryland 20899 While much is known of the fracture mechanics of composite materials, comparatively little is known of the micromechanisms that in fact control fracture toughness and strength

  11. State and Tribal Government Working Group Visits the Weldon Spring Site |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics AndBeryllium Disease |Records ManagementDepartmentFEOSHInquiryStandardServicesDepartment of

  12. July 17, 2008; HSS/Union Working Group Meeting, Safety Standards, 10 CFR 851 - Information Package

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA Public CommentInverted Attic9: HSS Focus Group10 CFR 851 /

  13. July 17, 2008; HSS/Union Working Group Meeting, Safety Standards, 10 CFR 851 - Agenda

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA Public CommentInverted Attic9: HSS Focus Group10 CFR 851

  14. Chernobyl Studies Project: Working group 7.0, Environmental transport and health effects. Progress report, March--September 1994

    SciTech Connect (OSTI)

    Anspaugh, L.R.; Hendrickson, S.M.

    1994-12-01

    In April 1988, the US and the former-USSR signed a Memorandum of Cooperation (MOC) for Civilian Nuclear Reactor Safety; this MOC was a direct result of the accident at the Chernobyl Nuclear Power Plant Unit 4 and the following efforts by the two countries to implement a joint program to improve the safety of nuclear power plants and to understand the implications of environmental releases. A Joint Coordinating Committee for Civilian Nuclear Reactor Safety (JCCCNRS) was formed to implement the MOC. The JCCCNRS established many working groups; most of these were the responsibility of the Nuclear Regulatory Commission, as far as the US participation was concerned. The lone exception was Working Group 7 on Environmental Transport and Health Effects, for which the US participation was the responsibility of the US Department of Energy (DOE). The purpose of Working Group 7 was succintly stated to be, ``To develop jointly methods to project rapidly the health effects of any future nuclear reactor accident.`` To implement the work DOE then formed two subworking groups: 7.1 to address Environmental Transport and 7.2 to address Health Effects. Thus, the DOE-funded Chernobyl Studies Project began. The majority of the initial tasks for this project are completed or near completion. The focus is now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are currently working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.

  15. To: University administrators responsible for code of conduct and licensing issues From: The Members of the Designated Suppliers Program (DSP) Working Group

    E-Print Network [OSTI]

    Alpay, S. Pamir

    : The Members of the Designated Suppliers Program (DSP) Working Group Date: September 29, 2006 Re: Revisions to the DSP The Designated Suppliers Program (DSP) Working Group has been meeting since March of this year Group, have expressed about the program. The following document "Designated Suppliers Program

  16. Report of the Snowmass M6 Working Group on high intensity proton sources

    SciTech Connect (OSTI)

    Weiren Chou and J. Wei

    2002-08-20

    The U.S. high-energy physics program needs an intense proton source, a 1-4 MW Proton Driver (PD), by the end of this decade. This machine will serve as a stand-alone facility that will provide neutrino superbeams and other high intensity secondary beams such as kaons, muons, neutrons, and anti-protons (cf. E1 and E5 group reports) and also serve as the first stage of a neutrino factory (cf. M1 group report). It can also be a high brightness source for a VLHC. Based on present accelerator technology and project construction experience, it is both feasible and cost-effective to construct a 1-4 MW Proton Driver. Two recent PD design studies have been made, one at FNAL and the other at the BNL. Both designed PD's for 1 MW proton beams at a cost of about U.S. $200M (excluding contingency and overhead) and both designs were upgradeable to 4 MW. An international collaboration between FNAL, BNL and KEK on high intensity proton facilities is addressing a number of key design issues. The superconducting (sc) RF cavities, cryogenics, and RF controls developed for the SNS can be directly adopted to save R&D efforts, cost, and schedule. PD studies are also actively being pursued at Europe and Japan.

  17. 2001-2002 Long Range Plan Working Group Members | U.S. DOE Office of

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLosThe 26thI D- 6 0GrantsThe Life of Enrico's The Ernest

  18. 2007 Long Range Plan Working Group Members | U.S. DOE Office of Science

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLosThe 26thI D- 6 0GrantsThe Life of Enrico's The Ernest(SC) 7 Long

  19. Working Group Report on - Space Nuclear Power Systems and Nuclear Waste

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricNCubictheThepresented in1: Model or

  20. Y-12 recognized for work with STEM group | National Nuclear Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLos Alamos verifies largest single andNuclearsafetyY-12 recognized

  1. March 3-4, 2008/ARR Power Management Technical Working Group

    E-Print Network [OSTI]

    Raffray, A. René

    required lifetime at operating conditions compatible with reasonable power cycle efficiency · Accommodation

  2. September 6-7, 2007/ARR Power Management Technical Working Group

    E-Print Network [OSTI]

    Raffray, A. René

    conditions. · ITER plays a critical role in the development of fusion energy, and contributes valuable of an attractive power plant. - Substantial information gap for DEMO. · In order to build and license or sequential with ITER. - Decision to move ahead with complementary fusion energy R&D depends on national

  3. US DOE-EM On-Site Disposal Cell Working Group - Fostering Communication On Performance Assessment Challenges

    SciTech Connect (OSTI)

    Seitz, Roger R. [Savannah River Site (SRS), Aiken, SC (United States); Suttora, Linda C. [U.S. Department of Energy, Office of Site Restoration, Germantown, MD (United States); Phifer, Mark [Savannah River Site (SRS), Aiken, SC (United States)

    2014-03-01

    On-site disposal cells are in use and being considered at several U.S. Department of Energy (USDOE) sites as the final disposition for large amounts of waste associated with cleanup of contaminated areas and facilities. These facilities are typically developed with regulatory oversight from States and/or the US Environmental Protection Agency (USEPA) in addition to USDOE. The facilities are developed to meet design standards for disposal of hazardous waste as well as the USDOE performance based standards for disposal of radioactive waste. The involvement of multiple and different regulators for facilities across separate sites has resulted in some differences in expectations for performance assessments and risk assessments (PA/RA) that are developed for the disposal facilities. The USDOE-EM Office of Site Restoration formed a working group to foster improved communication and sharing of information for personnel associated with these Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) disposal cells and work towards more consistent assumptions, as appropriate, for technical and policy considerations related to performance and risk assessments in support of a Record of Decision and Disposal Authorization Statement. The working group holds teleconferences, as needed, focusing on specific topics of interest. The topics addressed to date include an assessment of the assumptions used for performance assessments and risk assessments (PA/RAs) for on-site disposal cells, requirements and assumptions related to assessment of inadvertent intrusion, DOE Manual 435.1-1 requirements, and approaches for consideration of the long-term performance of liners and covers in the context of PAs. The working group has improved communication among the staff and oversight personnel responsible for onsite disposal cells and has provided a forum to identify and resolve common concerns.

  4. Marginalised social groups in contemporary weee management within social enterprises investments: A study in Greece

    SciTech Connect (OSTI)

    Papaoikonomou, K. Kipouros, S.; Kungolos, A.; Somakos, L.; Aravossis, K.; Antonopoulos, I.; Karagiannidis, A.

    2009-05-15

    This paper deals with the creation of appropriate conditions aimed at developing social services for reuse and recycling of waste electrical and electronic equipment (WEEE), by the inclusion of handicapped and Roma people in the workforce. Application areas for the project are the Hellenic (Greek) regions of Thessaly and North Aegean, where these groups suffer from professional and social exclusion. The efforts to reduce unemployment in the two aforementioned groups, together with the efforts to implement related Greek and European legislation for sustainable WEEE management, are examined here. Furthermore, networking and cooperation at local, regional and central levels between small enterprises, entrepreneurships and local authorities are examined, so that these social enterprises and their corresponding investments may support the development of the Greek alternative WEEE recycling system.

  5. Solar America Initiative State Working Group: Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Julie Taylor

    2012-03-30

    Through the support from the Department of Energy, NARUC has educated thousands of stakeholders, including Public Utility Commissioners, commission staff, and State energy officials on solar energy technology, implementation, and policy. During the lifetime of this grant, NARUC staff engaged stakeholders in policy discussions, technical research, site visits, and educational meetings/webinars/materials that provided valuable education and coordination on solar energy technology and policy among the States. Primary research geared toward State decision-makers enabled stakeholders to be informed on current issues and created new solar energy leaders throughout the United States. Publications including a Frequently Asked Questions guide on feed-in tariffs and a legal analysis of state implementation of feed-in tariffs gave NARUC members the capacity to understand complex issues related to the economic impacts of policies supportive of solar energy, and potential paths for implementation of technology. Technical partnerships with the National Renewable Energy Laboratory (NREL) instructed NARUC members on feed-in tariff policy for four States and solar PV resource assessment in seven States, as well as economic impacts of solar energy implementation in those States. Because many of the States in these technical partnerships had negligible amounts of solar energy installed, this research gave them new capacity to understand how policies and implementation could impact their constituency. This original research produced new data now available, not only to decision-makers, but also to the public at-large including educational institutions, NGOs, consumer groups, and other citizens who have an interest in solar energy adoption in the US. Under this grant, stakeholders engaged in several dialogs. These educational opportunities brought NARUC members and other stakeholders together several times each year, shared best practices with State decision-makers, fostered partnerships and relationships with solar energy experts, and aided in increasing the implementation of smart policies that will foster solar technology deployment. The support from the Department of Energyâ??s Office of Energy Efficiency and Renewable Energy has created solar energy leaders in the States; leaders who will serve to be a continuing valuable resource as States consider adoption of new low-carbon and domestic energy supply to meet the energy needs of the United States.

  6. Report of the Snowmass T4 working group on particle sources: Positron sources, anti-proton sources and secondary beams

    SciTech Connect (OSTI)

    N. Mokhov et al.

    2002-12-05

    This report documents the activities of the Snowmass 2001 T4 Particle Sources Working Group. T4 was charged with examining the most challenging aspects of positron sources for linear colliders and antiproton sources for proton-antiproton colliders, and the secondary beams of interest to the physics community that will be available from the next generation of high-energy particle accelerators. The leading issues, limiting technologies, and most important R and D efforts of positron production, antiproton production, and secondary beams are discussed in this paper. A listing of T4 Presentations is included.

  7. 2014-05-05 Issuance: ASRAC Commercial and Industrial Pumps Working Group; Notice of Open Teleconference/Webinar

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of open teleconference/webinar regarding the commercial and industrial pumps working group, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  8. Proceedings of the second FY87 meeting of the National Working Group for Reduction in Transuranic Waste Arisings

    SciTech Connect (OSTI)

    Not Available

    1987-09-01

    The Second FY87 Meeting of the National Working Group for Reduction in Transuranic Waste Arisings (NWGRTWA) was held at the Lawrence Livermore National Laboratory, Tuesday and Wednesday, July 28--29, 1987. The purpose of the meeting was to discuss (1) modeling programs for waste reduction, (2) proposed FY88 and out-year tasks including the SRL Pu incineration, immobilization improvement, erbia coating technology, and (3) improvements in up-stream recovery operations to effect waste reduction. In addition, tours were made of the LLNL Waste Operations, the Laser Fusion (NOVA), and the Magnetic Fusion (MFTF).

  9. 173TURTLE TAXONOMY WORKING GROUP Annotated List of Turtle Taxa Defining Turtle Diversity: Proceedings of a Workshop on Genetics, Ethics, and Taxonomy of Freshwater Turtles and Tortoises

    E-Print Network [OSTI]

    Grether, Gregory

    173TURTLE TAXONOMY WORKING GROUP ­ Annotated List of Turtle Taxa Defining Turtle Diversity: Proceedings of a Workshop on Genetics, Ethics, and Taxonomy of Freshwater Turtles and Tortoises H. Bradley with Comments on Areas of Taxonomic Instability and Recent Change TURTLE TAXONOMY WORKING GROUP* * Authorship

  10. Trails Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complex Baseline Study, Los Alamos National Laboratory, New Mexico 2010 Response to the Impact of Social Trails Use on Cultural Resources in Technical Areas 70 and 71, Los Alamos...

  11. Winter 2013 Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAbout /Two0Photos andSeminarsDesign »Wind and solar3 CSTEC W

  12. Summer 2012 Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired Solar Fuel Production 1: Total systemsSuccess StoriesPlasma

  13. Trails Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired Solar FuelTechnologyTel:FebruaryEIA's Today8TopoTowardsList Trails

  14. CSTEC Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room News PublicationsAudits &BradburyMay 1, 2013, 4:15pmEnergyNovemberCompute

  15. Macro Industrial Working Group

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963Residential2, 2014 MEMORANDUM FOR: JOHN CONTI

  16. Buildings Sector Working Group

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963 1.969 1.979Coal4 Arizona - NaturalYear JanProfileDecadeJuly 22, 2013

  17. Fall 2012 Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES OctoberEvan Racah861 ANNUAL|FacilityAbout »FacultyFaisal2 C

  18. Fall 2013 Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES OctoberEvan Racah861 ANNUAL|FacilityAbout »FacultyFaisal2 C3 C

  19. SCM Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust, High-Throughput Analysis of Protein1-0845* Storage Systems and ParallelHPX3-0696 1SCC:

  20. SCM Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust, High-Throughput Analysis of Protein1-0845* Storage Systems and ParallelHPX3-0696

  1. SCM Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust, High-Throughput Analysis of Protein1-0845* Storage Systems and ParallelHPX3-0696How Do

  2. Radiative Processes Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100 Winners * Impacts on GlobalRachel RuggirelloRadiative Influences onmeeting,

  3. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

  4. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

  5. High Energy Physics Forum for Computational Excellence: Working Group Reports (I. Applications Software II. Software Libraries and Tools III. Systems)

    E-Print Network [OSTI]

    Habib, Salman; LeCompte, Tom; Marshall, Zach; Borgland, Anders; Viren, Brett; Nugent, Peter; Asai, Makoto; Bauerdick, Lothar; Finkel, Hal; Gottlieb, Steve; Hoeche, Stefan; Sheldon, Paul; Vay, Jean-Luc; Elmer, Peter; Kirby, Michael; Patton, Simon; Potekhin, Maxim; Yanny, Brian; Calafiura, Paolo; Dart, Eli; Gutsche, Oliver; Izubuchi, Taku; Lyon, Adam; Petravick, Don

    2015-01-01

    Computing plays an essential role in all aspects of high energy physics. As computational technology evolves rapidly in new directions, and data throughput and volume continue to follow a steep trend-line, it is important for the HEP community to develop an effective response to a series of expected challenges. In order to help shape the desired response, the HEP Forum for Computational Excellence (HEP-FCE) initiated a roadmap planning activity with two key overlapping drivers -- 1) software effectiveness, and 2) infrastructure and expertise advancement. The HEP-FCE formed three working groups, 1) Applications Software, 2) Software Libraries and Tools, and 3) Systems (including systems software), to provide an overview of the current status of HEP computing and to present findings and opportunities for the desired HEP computational roadmap. The final versions of the reports are combined in this document, and are presented along with introductory material.

  6. High Energy Physics Forum for Computational Excellence: Working Group Reports (I. Applications Software II. Software Libraries and Tools III. Systems)

    E-Print Network [OSTI]

    Salman Habib; Robert Roser; Tom LeCompte; Zach Marshall; Anders Borgland; Brett Viren; Peter Nugent; Makoto Asai; Lothar Bauerdick; Hal Finkel; Steve Gottlieb; Stefan Hoeche; Paul Sheldon; Jean-Luc Vay; Peter Elmer; Michael Kirby; Simon Patton; Maxim Potekhin; Brian Yanny; Paolo Calafiura; Eli Dart; Oliver Gutsche; Taku Izubuchi; Adam Lyon; Don Petravick

    2015-10-29

    Computing plays an essential role in all aspects of high energy physics. As computational technology evolves rapidly in new directions, and data throughput and volume continue to follow a steep trend-line, it is important for the HEP community to develop an effective response to a series of expected challenges. In order to help shape the desired response, the HEP Forum for Computational Excellence (HEP-FCE) initiated a roadmap planning activity with two key overlapping drivers -- 1) software effectiveness, and 2) infrastructure and expertise advancement. The HEP-FCE formed three working groups, 1) Applications Software, 2) Software Libraries and Tools, and 3) Systems (including systems software), to provide an overview of the current status of HEP computing and to present findings and opportunities for the desired HEP computational roadmap. The final versions of the reports are combined in this document, and are presented along with introductory material.

  7. Snowmass Cosmic Frontiers 6 (CF6) Working Group Summary --The Bright Side of the Cosmic Frontier: Cosmic Probes of Fundamental Physics

    E-Print Network [OSTI]

    J. J. Beatty; A. E. Nelson; A. Olinto; G. Sinnis; A. U. Abeysekara; L. A. Anchordoqui; T. Aramaki; J. Belz; J. H. Buckley; K. Byrum; R. Cameron; M-C. Chen; K. Clark; A. Connolly; D. Cowen; T. DeYoung; P. von Doetinchem J. Dumm; M. Errando; G. Farrar; F. Ferrer; L. Fortson; S. Funk; D. Grant; S. Griffiths; A. Groß; C. Hailey; C. Hogan; J. Holder; B. Humensky; P. Kaaret; S. R. Klein; H. Krawczynski; F. Krennrich; K. Krings; J. Krizmanic; A. Kusenko; J. T. Linnemann; J. H. MacGibbon; J. Matthews; A. McCann; J. Mitchell; R. Mukherjee; D. Nitz; R. A. Ong; M. Orr; N. Otte; T. Paul; E. Resconi; M. A. Sanchez-Conde; P. Sokolsky; F. Stecker; D. Stump; I. Taboada; G. B. Thomson; K. Tollefson; P. von Doetinchem; T. Ukwatta; J. Vandenbroucke; V. Vasileiou; V. V. Vassileiv; T. J. Weiler; D. A. Williams; A. Weinstein; M. Wood; B. Zitzer

    2013-10-25

    Report of the CF6 Working Group at Snowmass 2013. Topics addressed include ultra-high energy cosmic rays, neutrinos, gamma rays, baryogenesis, and experiments probing the fundamental nature of spacetime.

  8. 73TURTLE TAXONOMY WORKING GROUP Recommendations and Guidelines Defining Turtle Diversity: Proceedings of a Workshop on Genetics, Ethics, and Taxonomy of Freshwater Turtles and Tortoises

    E-Print Network [OSTI]

    Grether, Gregory

    73TURTLE TAXONOMY WORKING GROUP ­ Recommendations and Guidelines Defining Turtle Diversity: Proceedings of a Workshop on Genetics, Ethics, and Taxonomy of Freshwater Turtles and Tortoises H. Bradley 4:73-84 · © 2007 by Chelonian Research Foundation Turtle Taxonomy: Methodology, Recommendations

  9. Job Stress in Disaster Case Managers Working with Hurricane Ike Recovery 

    E-Print Network [OSTI]

    Forman, Megan Hajecate

    2011-10-21

    Hurricane Ike struck the coast of Texas on September 13, 2008. The Federal Emergency Management Agency (FEMA), a branch of the United States Department of Homeland Security, implemented a Disaster Case Management Pilot (DCM-P) project to help...

  10. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    SciTech Connect (OSTI)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  11. Access to digital collections of public domain works: Enclosure of the commons managed by libraries and museums

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    by libraries and museums M. Dulong de Rosnay1 Abstract Digital copies of physical books and art objects curated, digitisation, enclosure, governance. 1. INTRODUCTION Libraries and museums are digitizing their collections1 Access to digital collections of public domain works: Enclosure of the commons managed

  12. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    SciTech Connect (OSTI)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  13. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  14. Management Information Systems (MIS) This sheet has sample occupations, work settings, employers, and career development activities associated with this major. Some of these

    E-Print Network [OSTI]

    Ronquist, Fredrik

    Management Information Systems (MIS) This sheet has sample occupations, work settings, employers Security Specialist Computer Software Engineer Computer Support Specialist Computer and Information Systems/Officer Information Systems Analyst Information Technology Specialist Internet Recruiter Knowledge Manager Logistics

  15. Managing everyday identity challenges at work : stories from a biotech company

    E-Print Network [OSTI]

    Xu, Heng, Ph. D. Massachusetts Institute of Technology

    2009-01-01

    Work identity, how we view ourselves in a working capacity, is a central part of who we are and an indispensable element of our lives. Yet, difficult moments frequently occur that challenge our identity as competent and ...

  16. Does the River Continuum Concept Work in Small Island Streams? Functional Feeding Group Variation Along a Longitudinal Gradient

    E-Print Network [OSTI]

    Groff, Margaret H.

    2006-01-01

    Functional feeding groups Benthic macroinvertebrates are assigned to FFGs based on feeding mode and foodfood (Greathouse and Pringle 2006), an aspect not considered in this study. The functionalfunctional feeding groups (FFGs) will also change to reflect the increase in habitat diversity and the shift in food

  17. September 2002 Working Group Meeting on Heavy Vehicle Aerodynamic Drag: Presentations and Summary of Comments and Conclusions

    SciTech Connect (OSTI)

    McCallen, R

    2002-09-01

    A Working Group Meeting on Heavy Vehicle Aerodynamic Drag was held at NASA Ames Research Center on September 23, 2002. The purpose of the meeting was to present and discuss technical details on the experimental and computational work in progress and future project plans. Representatives from the Department of Energy (DOE)/Office of Energy Efficiency and Renewable Energy/Office of FreedomCAR & Vehicle Technologies, Lawrence Livermore National Laboratory (LLNL), Sandia National Laboratories (SNL), NASA Ames Research Center (NASA), University of Southern California (USC), California Institute of Technology (Caltech), Georgia Tech Research Institute (GTRI), Argonne National Laboratory (ANL), Freightliner, and Portland State University participated in the meeting. This report contains the technical presentations (viewgraphs) delivered at the Meeting, briefly summarizes the comments and conclusions, and outlines the future action items. The meeting began with an introduction by the Project Lead Rose McCallen of LLNL, where she emphasized that the world energy consumption is predicted to relatively soon exceed the available resources (i.e., fossil, hydro, non-breeder fission). This short fall is predicted to begin around the year 2050. Minimizing vehicle aerodynamic drag will significantly reduce our Nation's dependence on foreign oil resources and help with our world-wide fuel shortage. Rose also mentioned that educating the populace and researchers as to our world energy issues is important and that our upcoming United Engineering Foundation (UEF) Conference on ''The Aerodynamics of Heavy Vehicles: Trucks, Busses, and Trains'' was one way our DOE Consortium was doing this. Mentioned were the efforts of Fred Browand from USC in organizing and attracting internationally recognized speakers to the Conference. Rose followed with an overview of the DOE project goals, deliverables, and FY03 activities. The viewgraphs are attached at the end of this report. Sid Diamond of DOE discussed the reorganization of the Office of Energy Efficiency and Renewable Energy and that the Office of Heavy Vehicle Technology is now part of the Office of FreedomCAR & Vehicle Technologies. Sid reviewed the FY03 budget and provided information on some plans for FY04. The soon to be posted DOE request for proposals from industry for projects related to parasitic energy losses was discussed. A minimum of 50% cost share by industry will be required and the proposal must be submitted by industry. Collaborative efforts in aerodynamic drag with members of the DOE consortium are encouraged. Sid also mentioned interest in aerodynamic drag contribution due to wheel wells and underbody flow. Sid also mentioned his continued interest in the application of our computational and experimental expertise to the area of locomotive and railcar aerodynamics for the reduction of drag effects and thus, the reduction of fuel consumption by trains. In summary, the technical presentations at the meeting included a review of experimental results and plans by GTRI, USC, and NASA Ames, the computational results from LLNL and SNL for the integrated tractor-trailer benchmark geometry called the Ground Transportation System (GTS) model, and by LLNL for the tractor-trailer gap and trailer wake flow, and turbulence model development and benchmark simulations being investigated by Caltech. USC is also investigating an acoustic drag reduction device that has been named ''Mozart'', GTRI continues their investigation of a blowing device, and LLNL presented their ideas for 2 new base drag reduction devices. ANL presented their plans for a DOE supported Cooperative Research and Development Agreement (CRADA) with Paccar Truck Company utilizing commercial software tools to simulate the flow and drag for an actual tractor and showed the results of some preliminary griding attempts. The attendees also had the opportunity to tour the 12-ft pressure wind tunnel the machine shop were the Generic Conventional Model (GCM, a.k.a. SLRT) was being readied for the scheduled November experiments. Much of

  18. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    SciTech Connect (OSTI)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  19. NREL Works to Increase Electric Vehicle Efficiency Through Enhanced Thermal Management (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-06-01

    Researchers at NREL are providing new insight into how heating and cooling systems affect the distance that electric vehicles can travel on a single charge. Electric vehicle range can be reduced by as much as 68% per charge because of climate-control demands. NREL engineers are investigating opportunities to change this dynamic and increase driving range by improving vehicle thermal management. NREL experts are collaborating with automotive industry partners to investigate promising thermal management technologies and strategies, including zone-based cabin temperature controls, advanced heating and air conditioning controls, seat-based climate controls, vehicle thermal preconditioning, and thermal load reduction technologies.

  20. Introduction/Motivation Background/Notation Classification Results/Future Work/References Classifying Pairs of Fuchsian Groups

    E-Print Network [OSTI]

    Broughton, S. Allen

    Introduction/Motivation Background/Notation Classification Results/Future Work Regional Meeting at University of Tucson April 2007 #12;Introduction/Motivation Background/Notation Classification Results/Future Work/References Outline 1 Introduction/Motivation Motivation 1 - extension

  1. Hot Works Procedures and Protocols Last Updated: 2/14/2014 Owner: Safety and Risk Management Director Page 1 of 6

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Hot Works Procedures and Protocols Last Updated: 2/14/2014 Owner: Safety and Risk Management Director Page 1 of 6 INTRODUCTION The Office of Safety and Risk Management (SRM) has developed, implemented will notify the Office of Safety and Risk Management whether or not a fire watch is required. The Office

  2. WHEN WORKFLOW DOESN'T WORK Issues in Managing Dynamic Processes

    E-Print Network [OSTI]

    Corkill, Daniel

    , a landing-gear design specialist is a scarce resource that cannot be quickly supplemented with additional by design activities, present substantial problems for individuals charged with managing their execution. The design mantra of "better, cheaper, faster" is forcing design processes to operate with shorter time

  3. The Energy Manager - Should He Be Working Himself Out Of A Job? 

    E-Print Network [OSTI]

    Hogeland, A. W.

    1983-01-01

    The germ of what I would like to discuss with you today was generated in a shirt-sleeves session here in Houston last year. A number of you and other senior Energy Managers, some of whom have since retired, in the wake of the recession that all...

  4. To work on three collaborative research projects, the Georg-August-Universitt Gttingen Development Economics Research Group announces positions for

    E-Print Network [OSTI]

    Krivobokova, Tatyana

    in developing countries.' It includes projects for dynamic poverty measurement, the measurement of vulnerability particular expertise in empirical development economics. In this project there are 5 Ph.D. positions and 1 of women. The projects managed by Göttingen will include a project to develop a conceptual framework

  5. Data Working Group Determine if the University Libraries should accept broad responsibility for curating research data and, if

    E-Print Network [OSTI]

    Schweik, Charles M.

    be involved. Develop meaningful resources on data management for the University community. Activities include to evaluate preservation and metadata issues for research data, additional staff will be added members of the staff may be asked to join meetings when their specialized knowledge is needed. Information

  6. Activities of the NASA Exploration Team Human-Robotics Working Group Chris Culbert, Jen Rochlis, Fred Rehnmark, David Kortenkamp, Kevin Watson,

    E-Print Network [OSTI]

    Kortenkamp, David

    Activities of the NASA Exploration Team Human-Robotics Working Group Chris Culbert, Jen Rochlis, Fred Rehnmark, David Kortenkamp, Kevin Watson, Rob Ambrose, Ron Diftler, Brenda Ward NASA/Johnson Space Center Liam Pedersen NASA/Ames Research Center Chuck Weisbin, Guillermo Rodriguez, Bob Easter Jet

  7. Close interaction between students and faculty and between students in working groups is a hallmark of the Marketing program at Stetson.

    E-Print Network [OSTI]

    Miles, Will

    Marketing Close interaction between students and faculty and between students in working groups is a hallmark of the Marketing program at Stetson. Small classes and sophisticated team projects using business Program The Marketing Career Development Experience is a unique course offering for our Marketing majors

  8. A history of the working group to address Los Alamos community health concerns - A case study of community involvement and risk communication

    SciTech Connect (OSTI)

    Harry Otway; Jon Johnson

    2000-01-01

    In May 1991, at a Department of Energy (DOE) public hearing at Los Alamos, New Mexico, a local artist claimed there had been a recent brain tumor cluster in a small Los Alamos neighborhood. He suggested the cause was radiation from past operations of Los Alamos National Laboratory. Data from the Laboratory's extensive environmental monitoring program gave no reason to believe this charge to be true but also could not prove it false. These allegations, reported in the local and regional media, alarmed the community and revealed an unsuspected lack of trust in the Laboratory. Having no immediate and definitive response, the Laboratory offered to collaborate with the community to address this concern. The Los Alamos community accepted this offer and a joint Community-Laboratory Working Group met for the first time 29 days later. The working group set as its primary goal the search for possible carcinogens in the local environment. Meanwhile, the DOE announced its intention to fund the New Mexico Department of Health to perform a separate and independent epidemiological study of all Los Alamos cancer rates. In early 1994, after commissioning 17 environmental studies and meeting 34 times, the working group decided that the public health concerns had been resolved to the satisfaction of the community and voted to disband. This paper tells the story of the artist and the working group, and how the media covered their story. It summarizes the environmental studies directed by the working group and briefly reviews the main findings of the epidemiology study. An epilogue records the present-day recollections of some of the key players in this environmental drama.

  9. Leaders of DOE Environmental Management Advisory Group to Meet in Henderson

    Broader source: Energy.gov [DOE]

    The Chairs and Vice-Chairs of the U.S. Department of Energy’s (DOE) Environmental Management (EM) Site-Specific Advisory Board (SSAB) will meet in Henderson, NV, April 13-14, at Green Valley Ranch located at 2300 Paseo Verde Parkway.

  10. Industrial demand-side management programs: What`s happened, what works, what`s needed

    SciTech Connect (OSTI)

    Jordan, J.A.; Nadel, S.M.

    1993-03-01

    In order to analyze experience to date with industrial demand-side management (DSM), a survey of utilities was conducted and a database of industrial DSM programs was prepared. More than eighty utilities and third-party organizations were interviewed. Data were collected via phone, fax, and/or mail from the utilities and entered into a database. In order to limit the scope of this study, the database contains incentive-based, energy-saving programs and not load management or information-only programs (including technical assistance programs). Programs in the database were divided into four categories: two ``prescriptive rebate`` categories and two ``custom rebate`` categories. The database contains 31 incentive-based, energy-saving industrial DSM programs offered by 17 utilities. The appendix to this report summarizes the results approximately 60 industrial DSM programs. Most of the programs included in the appendix, but not in the database, are either C&I programs for which commercial and industrial data were not disaggregated or new industrial DSM programs for which data are not yet available.

  11. Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Marsh, J.D.; McCarthy, J.F.

    1994-01-01

    This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

  12. Network Management Network Management

    E-Print Network [OSTI]

    Giaccone, Paolo

    Network Management Pag. 1 Network Management Andrea Bianco Telecommunication Network Group Network management and QoS provisioning - 1Andrea Bianco ­ TNG group - Politecnico di Torino Telecommunication management and QoS provisioning - 2Andrea Bianco ­ TNG group - Politecnico di Torino Stanford, California

  13. July 17, 2008; HSS/Union Working Group Meeting, Safety Standards, 10 CFR 851 Â… Meeting Summary

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA Public CommentInverted Attic9: HSS Focus Group10 CFR 85110 CFR

  14. Notes on the CRTDH Group Key Agreement Protocol Spyros Magliveras and Wandi Wei

    E-Print Network [OSTI]

    Magliveras, Spyros

    , the distributed schemes help in the uniform distribution of the work-load for key management and eliminate: xkzou@cs.iupui.edu Abstract Group key management (GKM) is one of the primary is- sues for secure group Key Management (GKM), Contributory Group Key Agreement, Chinese Remainder Theorem, Diffie-Hellman Key

  15. Chernobyl Studies Project - working group 7.0 environmental transport and health effects. Progress report, October 1993--January 1994

    SciTech Connect (OSTI)

    Hendrickson, S.M.

    1994-03-01

    The DOE-funded Chernobyl Studies Project was begun as part of a cooperative agreement between the US and the former USSR, (quote) To develop jointly methods to project rapidly the health effects of any future reactor accident (quote). Most of the initial tasks for this project are completed or near completion. The focus has now turned primarily to the issue of health effects from the Chernobyl accident. Currently, we are extensively engaged in case-control and cohort studies of thyroid diseases among Belarussian children and in the Ukraine. A major part of the effort is providing methods and applications of dose reconstruction and providing support and equipment for the medical teams. This document contains reports on progress in the following task areas: Management; External Dose; Hydrological Transport; Chromosome Painting Dosimetry; Stochastic Effects; Thyroid Studies; and Leukemia Studies.

  16. ORISE National Security and Emergency Management: How to Work with Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEY UNIVERSE The 2014 surveyNuclearHow to Work With Us The Oak Ridge

  17. 2014-08-07 Issuance: Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC)- Manufactured Housing Working Group; Notice of Open Meeting

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of open meeting regarding the Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC) - Manufactured Housing Working Group on August 7, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  18. Chernobyl Studies Project. Working Group 7.0, environmental transport and health effects. Progress report, February 1994

    SciTech Connect (OSTI)

    Hendrickson, S.M.

    1994-04-01

    The focus of the Chernobyl Studies Project has now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.

  19. The Water Resources Management (WRM) program is an interdisciplinary course of study leading to an M.S. degree in environmental studies. Degree requirements include a group

    E-Print Network [OSTI]

    Sheridan, Jennifer

    #12;Preface The Water Resources Management (WRM) program is an interdisciplinary course of study on a contemporary water resources problem. In 2007, in fulfillment of this requirement, a group of University Leaf (Chapters 1, 2 and 5) Geology, Water Resources Management andrew.t.leaf@gmail.com Amanda Perdzock

  20. The NIAC Convergence of Physical and Cyber Technbologies and Related Security Management Challenges Working Group Final Report and Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState of Pennsylvania U.S.The6, 2015 TheThe

  1. WASHINGTON GROUP TEAM WINS NEW CONTRACT TO MANAGE WASTE ISOLATION PILOT PLANT IN NEW MEXICO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricN A 035(92/02) nerg *4 o** 0, WF* W A , oW4,j)5, 2000

  2. Team work: Construction

    E-Print Network [OSTI]

    Berdichevsky, Victor

    teamwork outside the classroom as well. Construction Management at Wayne StateTeam work: Construction Management The Division of Engineering Technology! Your coursework is just the beginning. Construction management students work

  3. SFU Rental Suites Managed by AWM-Alliance Real Estate Group Ltd. Verdant Rental Housing -state of the art Eco-Designed apartments for rent on campus to

    E-Print Network [OSTI]

    Kavanagh, Karen L.

    3/4/2014 SFU Rental Suites Managed by AWM-Alliance Real Estate Group Ltd. Verdant Rental Housing-Alliance's CONTACT INFORMATION AWM-Alliance Real Estate Group Ltd. #401 ­ 958 West 8th Avenue Vancouver, BC V5Z 1E5

  4. The management of imaging dose during image-guided radiotherapy: Report of the AAPM Task Group 75

    SciTech Connect (OSTI)

    Murphy, Martin J.; Balter, James; Balter, Stephen; BenComo, Jose A. Jr.; Das, Indra J.; Jiang, Steve B.; Ma, C.-M.; Olivera, Gustavo H.; Rodebaugh, Raymond F.; Ruchala, Kenneth J.; Shirato, Hiroki; Yin, Fang-Fang [Department of Radiation Oncology, Virginia Commonwealth University, Richmond, Virginia 23298 (United States) and Department of Radiation Oncology, University of Michigan, Ann Arbor, Michigan 48109 (United States); Departments of Medicine and Radiology, Columbia University Medical Center, New York, New York 10021 (United States) and Department of Radiation Physics, M.D. Anderson Cancer Center, Houston, Texas 77030 (United States); Department of Radiation Oncology, University of Pennsylvania School of Medicine, Philadelphia, Pennsylvania 19104 (United States); Department of Radiation Oncology, University of California, San Diego, La Jolla, California 92093 (United States); Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania 19111 (United States); Department of Medical Physics, University of Wisconsin, Madison, Wisconsin 53706 (United States); St. Joseph's Hospital, Phoenix, Arizona 85013 (United States); TomoTherapy, Inc., Madison, Wisconsin 53717 (United States); Department of Radiology, Hokkaido University Hospital, Hokkaido (Japan); Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States)

    2007-10-15

    Radiographic image guidance has emerged as the new paradigm for patient positioning, target localization, and external beam alignment in radiotherapy. Although widely varied in modality and method, all radiographic guidance techniques have one thing in common--they can give a significant radiation dose to the patient. As with all medical uses of ionizing radiation, the general view is that this exposure should be carefully managed. The philosophy for dose management adopted by the diagnostic imaging community is summarized by the acronym ALARA, i.e., as low as reasonably achievable. But unlike the general situation with diagnostic imaging and image-guided surgery, image-guided radiotherapy (IGRT) adds the imaging dose to an already high level of therapeutic radiation. There is furthermore an interplay between increased imaging and improved therapeutic dose conformity that suggests the possibility of optimizing rather than simply minimizing the imaging dose. For this reason, the management of imaging dose during radiotherapy is a different problem than its management during routine diagnostic or image-guided surgical procedures. The imaging dose received as part of a radiotherapy treatment has long been regarded as negligible and thus has been quantified in a fairly loose manner. On the other hand, radiation oncologists examine the therapy dose distribution in minute detail. The introduction of more intensive imaging procedures for IGRT now obligates the clinician to evaluate therapeutic and imaging doses in a more balanced manner. This task group is charged with addressing the issue of radiation dose delivered via image guidance techniques during radiotherapy. The group has developed this charge into three objectives: (1) Compile an overview of image-guidance techniques and their associated radiation dose levels, to provide the clinician using a particular set of image guidance techniques with enough data to estimate the total diagnostic dose for a specific treatment scenario (2) identify ways to reduce the total imaging dose without sacrificing essential imaging information, and (3) recommend optimization strategies to trade off imaging dose with improvements in therapeutic dose delivery. The end goal is to enable the design of image guidance regimens that are as effective and efficient as possible.

  5. 2014-07-21 Issuance: Appliance Standards and Rulemaking Federal Adivsory Committee (ASRAC)- Manufactured Housing Working Group; Notice of Open Meeting

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of public meeting for the Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC) - Manufactured Housing Working Group, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 21, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register ?publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  6. 2014-08-19 Issuance Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC)- Central Air Conditioner Regional Standards Enforcement Working Group; Notice of Open Meetings

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Registe notice of open meetings regarding the Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC) - Central Air Conditioner Regional Standards Enforcement Working Group, as issued by the Deputy Assistant Secretary for Energy Efficiency on August 19, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  7. Energy infrastructure of the United States and projected siting needs: Scoping ideas, identifying issues and options. Draft report of the Department of Energy Working Group on Energy Facility Siting to the Secretary

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    A Department of Energy (DOE) Working Group on Energy Facility Siting, chaired by the Policy Office with membership from the major program and staff offices of the Department, reviewed data regarding energy service needs, infrastructure requirements, and constraints to siting. The Working Group found that the expeditious siting of energy facilities has important economic, energy, and environmental implications for key Administration priorities.

  8. Massachusetts Wind Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    The meeting will feature a panel presentation and discussion on Shadow-Flicker, as well as updates related to the Community Wind Outreach Initiative.   Panel speakers so far include: Elizabeth King...

  9. CFCC working group meeting: Proceedings

    SciTech Connect (OSTI)

    1995-12-31

    The theme of the meeting was ``A Path to Commercialization`` and discussion was devoted to addressing the nearest-term products and the time frame for implementation. The objectives of the meeting were to identify the barriers to commercialization, methods to overcome these barriers, and the actions required to achieve success. The meeting was planned to bring together government agencies and industry customers and, suppliers to discuss and conclude where the CFCC Program is today, where it is going, and how they plan to get there. It was also planned to join component developers with end users who can describe systems needs and projected schedules for introducing CFCC components in industrial applications.

  10. 2011-2012 Working Groups

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.TheoryTuesday, August 10, 2010 james-r.giusti@srs.gov PaiviThursday,Results1 A

  11. Renewable Electricity Working Group Presentation

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet)Decade Year-0 Year-1 Year-2Feet)Thousand Cubic Feet)6984

  12. Working Group Industrial Presentation-2014

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet)Decade Year-0ProvedDecade Year-0 Year-1 Year-2YearWesternYearGas in Underground

  13. BEDES Strategic Working Group Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram:Y-12Power, Inc | DepartmentPeer20Insulatedof EnergyBEDES

  14. Reprinted from: New Technology, Work and Employment, 10 (1), March, 1995. pp 56 -67. Computer based Information Systems and Managers' Work.

    E-Print Network [OSTI]

    Kimble, Chris

    Reprinted from: New Technology, Work and Employment, 10 (1), March, 1995. pp 56 - 67. 1 Computer. #12;Reprinted from: New Technology, Work and Employment, 10 (1), March, 1995. pp 56 - 67. 2 2 written by Applegate et al 30 years later, argues that merely to react to new technology is a grossly

  15. Integration of Nevada Test Site (NTS) Work Control Programs and Incorporating Integrated Safety Management (ISM) into Activity Level Work Planning and Control

    SciTech Connect (OSTI)

    Mike Kinney and Kevin Breen

    2008-08-30

    This session will examine a method developed by Federal and Contractor personnel at the Nevada Site Office (NSO) to improve the planning and execution of work activities utilizing an Activity Level Work Control process in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations. The process was initially developed during Fiscal Year (FY) 2007, and implementation is commencing during the fourth quarter of FY 2008. This process will significantly enhance the flexibility and the appropriate rigor in the performance of work activities.

  16. An analysis of culture in The Kirin Group

    E-Print Network [OSTI]

    Yoshida, Satoko

    2014-01-01

    Today, a broad and deep understanding of the concept of "culture" is one of the keys to understanding and solving the challenges of managing complex organizations. The Kirin Group, too, has been working on changing its ...

  17. Art / Arts Management This sheet has sample occupations, work settings, employers, and career development activities associated with this major. Some of these

    E-Print Network [OSTI]

    Ronquist, Fredrik

    Art / Arts Management This sheet has sample occupations, work settings, employers, and career Occupations Airbrush Artist Animator/Multimedia Artist Architect Archivist/Curator Art Appraiser Art Center Director Art Conservator Art Director (Motion Picture, Radio, TV) Art Educator Art Therapist Art Agent

  18. ISSUANCE 2015-08-19: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Intent to Establish the Dedicated Purpose Pool Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards

    Broader source: Energy.gov [DOE]

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Intent to Establish the Dedicated Purpose Pool Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards

  19. The New JNCHES Equality Working Groupa New JNCHES Sustainability

    E-Print Network [OSTI]

    Crawford, Ian

    The New JNCHES Equality Working Groupa New JNCHES Sustainability Issues Working Group An Insider Institutions (HEIs) manage their finances and report their financial performance Introduction This Guide has on a draft of the Guide and their contribution is much appreciated. 1 By the Sustainability Issues Working

  20. Group X

    SciTech Connect (OSTI)

    Fields, Susannah

    2007-08-16

    This project is currently under contract for research through the Department of Homeland Security until 2011. The group I was responsible for studying has to remain confidential so as not to affect the current project. All dates, reference links and authors, and other distinguishing characteristics of the original group have been removed from this report. All references to the name of this group or the individual splinter groups has been changed to 'Group X'. I have been collecting texts from a variety of sources intended for the use of recruiting and radicalizing members for Group X splinter groups for the purpose of researching the motivation and intent of leaders of those groups and their influence over the likelihood of group radicalization. This work included visiting many Group X websites to find information on splinter group leaders and finding their statements to new and old members. This proved difficult because the splinter groups of Group X are united in beliefs, but differ in public opinion. They are eager to tear each other down, prove their superiority, and yet remain anonymous. After a few weeks of intense searching, a list of eight recruiting texts and eight radicalizing texts from a variety of Group X leaders were compiled.

  1. McMaster University Risk Management

    E-Print Network [OSTI]

    Thompson, Michael

    McMaster University Risk Management Manual RMM # 304 Title: Persons Working Alone Date: Dec 2002 Page: 1 of 10 Submitted: Risk Management Support Group Approved: Karen Belaire Vice President.10 McMaster University Standard Operating Procedures Policy. #12;McMaster University Risk Management

  2. Genomics:GTL Contractor-Grantee Workshop IV and Metabolic Engineering Working Group Inter-Agency Conference on Metabolic Engineering 2006

    SciTech Connect (OSTI)

    Mansfield, Betty Kay; Martin, Sheryl A

    2006-02-01

    Welcome to the 2006 joint meeting of the fourth Genomics:GTL Contractor-Grantee Workshop and the six Metabolic Engineering Working Group Inter-Agency Conference. The vision and scope of the Genomics:GTL program continue to expand and encompass research and technology issues from diverse scientific disciplines, attracting broad interest and support from researchers at universities, DOE national laboratories, and industry. Metabolic engineering's vision is the targeted and purposeful alteration of metabolic pathways to improve the understanding and use of cellular pathways for chemical transformation, energy transduction, and supramolecular assembly. These two programs have much complementarity in both vision and technological approaches, as reflected in this joint workshop. GLT's challenge to the scientific community remains the further development and use of a broad array of innovative technologies and computational tools to systematically leverage the knowledge and capabilities brought to us by DNA sequencing projects. The goal is to seek a broad and predictive understanding of the functioning and control of complex systems--individual microbes, microbial communities, and plants. GTL's prominent position at the interface of the physical, computational, and biological sciences is both a strength and challenge. Microbes remain GTL's principal biological focus. In the complex 'simplicity' of microbes, they find capabilities needed by DOE and the nation for clean and secure energy, cleanup of environmental contamination, and sequestration of atmospheric carbon dioxide that contributes to global warming. An ongoing challenge for the entire GTL community is to demonstrate that the fundamental science conducted in each of your research projects brings us a step closer to biology-based solutions for these important national energy and environmental needs.

  3. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:www.nnsa.energy.govaboutusouroperationsmanagementandbudget

  4. Relationships among Non-Academic Employee Perceptions of Manager Leadership Behaviors, Meaningful Work, and Selected Performance Drivers 

    E-Print Network [OSTI]

    Hammons, Laura

    2013-06-25

    U.S. public institutions of higher education are unique work environments that employ millions of faculty, staff, and administrators. Reported research on human resource issues for non-academic employees within higher education, however, is scarce...

  5. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-04-20

    It establishes a work authorization and control process for work performed by designated management and operating (M&O), management and integrating (M&I), environmental restoration management contracts (ERMC) and other contracts determined by the Procurement Executive (hereafter referred to as M&O contractors). Cancels DOE O 5700.7C. Canceled by DOE O 412.1A.

  6. M. D. Lemmon and P. J. Antsaklis, "Towards a Working Characterization of "Intelligent" Supervisory Control," Technical Report of the ISIS (Interdisciplinary Studies of Intelligent Systems) Group, No. ISIS-

    E-Print Network [OSTI]

    Antsaklis, Panos

    Control," Technical Report of the ISIS (Interdisciplinary Studies of Intelligent Systems) Group, No. ISIS Characterization of "Intelligent" Supervisory Control," Technical Report of the ISIS (Interdisciplinary Studies of Intelligent Systems) Group, No. ISIS- 93-007, Univ of Notre Dame, November 1993. #12;M. D. Lemmon and P. J

  7. Waste Management Quality Assurance Plan

    E-Print Network [OSTI]

    Waste Management Group

    2006-01-01

    Waste Management group organization chart. Revised to updatecurrent practices. New organization chart, roles, andManagement Group organization chart. EH&S Waste Management

  8. The Management department helps students become good decision makers and managers. If you are interested in working in supply chain management, being a leader in a specific industry, or starting your own company, the Supply Chain

    E-Print Network [OSTI]

    a manager for a day Search the web for job profiles and position descriptions Talk to alumni of the Management program Take an online assessment (see the Career Center website) Talk with a career counselor Fair; ask about the tasks of managers Last Updated - January 15, 2015 TO SC H E D UL E AN AP P O I N

  9. 5. ODBMS Standards Many different groups are engaged in developing standards that use object concepts. These

    E-Print Network [OSTI]

    Reverbel, Francisco

    ) --- ANSI X3H6 (CASE) --- ANSI X3H4 (IRDS) . groups working on generic object standards --- ISO ODP, ANSI X3T3 (Open Distributed Processing) --- ANSI X3H7 (Object Information Management) --- ANSI X3T5.4 (managed objects) . object­oriented programming language groups, e.g. --- ANSI X3J20 (Smalltalk) --- ANSI X

  10. DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan

    E-Print Network [OSTI]

    DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN Management Plans

  11. Automata groups 

    E-Print Network [OSTI]

    Muntyan, Yevgen

    2010-01-16

    automata over the alphabet of 2 letters and 2-state automata over the 3-letter alphabet. We continue the classification work started by the research group at Texas A&M University ([BGK+07a, BGK+07b]) and further reduce the number of pairwise nonisomorphic...

  12. September 8, 2011, HSS/Union Focus Group Work Group Telecom - Work Group Charter

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummaryDISTDepartment SEMIANNUAL REPORT TO SafetySeptofTEMPLATE Office of

  13. September 8, 2011, HSS/Union Focus Group Work Group Telecom - Work Group Guidance

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummaryDISTDepartment SEMIANNUAL REPORT TO SafetySeptofTEMPLATE Office

  14. September 8, 2011, HSS/Union Focus Group Work Group Telecom - Work Group matrix

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummaryDISTDepartment SEMIANNUAL REPORT TO SafetySeptofTEMPLATE OfficeRev

  15. Chemical Management Contacts

    Broader source: Energy.gov [DOE]

    Contacts for additional information on Chemical Management and brief description on Energy Facility Contractors Group

  16. September 16, 2008; HSS/Union Working Group Meeting, Former Worker and Energy Compensation Programs, CAIRS Reporting, Central Worker Data Tracking - Agenda

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to theDepartment of|NewSeptember 13,Working

  17. September 16, 2008; HSS/Union Working Group Meeting, Former Worker and Energy Compensation Programs, CAIRS Reporting, Central Worker Data Tracking - Information Package

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to theDepartment of|NewSeptember 13,WorkingDOE

  18. PROGRAMME GROUP RESEARCH UPDATE: Biodiversity indicators &

    E-Print Network [OSTI]

    operations and impacts, tree species type and site quality, observation and evidence of forest biological1 PROGRAMME GROUP RESEARCH UPDATE: Biodiversity indicators & knowledge management programme group Introduction Duncan Ray The programme group Biodiversity Indicators and Knowledge Management (BIKM

  19. management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLosThe 26th AnnualHistoryM aterialsmFUSE: Function

  20. Conference Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-03

    To establish requirements and responsibilities with respect to managing conferences sponsored by the Department of Energy (DOE) or by DOE management and operating contractors and other contractors who perform work at DOE-owned or -leased facilities, including management and integration contractors and environmental restoration management contractors (when using funds that will be reimbursed by DOE). Cancels DOE N 110.3.

  1. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Sulphuric Acid Process: Sulphuric Acid for cleaning solutions

  2. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Hydrofluoric acid Process: Highly toxic etchant for Silicon

  3. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Potassium Hydroxide Process: Potassium Hydroxide for silicon

  4. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Hydrochloric Acid Process: Hydrochloric acid for metal etches

  5. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Phosphoric Acid Process: Phosphoric acid for Silicon Nitride

  6. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Ammonium Hydroxide Process: Ammonium Hydroxide for metal

  7. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Piranha Process: Piranha for cleaning, etch and surface

  8. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Hydrofluoric Acid 6. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Hydrofluoric Acid 6. Haz Waste Management Ammonium Fluoride Process: Highly toxic

  9. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Hydrogen Peroxide Process: Hydrogen Peroxide for etches

  10. CSREES Nutrient Management Working Meeting

    E-Print Network [OSTI]

    ., outreach) - Impact: social, economic, environmental #12;Your ChargeYour Charge Identify:Identify: -- Major · Mississippi · New Mexico · North Carolina · Oklahoma · South Carolina · Tennessee · Texas #12;Meeting agencies) · Coordinate efforts to maximize impacts; reduce duplication of effort. · Facilitate delivery

  11. Manager, Digital Developer Risk & Information Management Group

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    server · Deep understanding of the Web technology stack (TCP/IP, HTTP, HTML, XHTML, XML, JavaScript, CSS with at least one web programming languages such as Python, PHP, C/C++, C#, Ruby, or Java, especially on web, or other Web 2.0 solutions · Experience in machine learning, information retrieval, large-scale data mining

  12. Waste Management Quality Assurance Plan

    E-Print Network [OSTI]

    Waste Management Group

    2006-01-01

    LBNL/PUB-5352, Revision 6 Waste Management QualityAssurance Plan Waste Management Group Environment, HealthRev. 6 WM QA Plan Waste Management Quality Assurance Plan

  13. July 2012, Work Force Retention Work Group Status Overview

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOE Safety Standards Implementation July 17, 2008 Purpose This analysis

  14. Work Force Retention Work Group Charter | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowingFuelWeatherize »Eve Kovacs WomenPamTinaHeat & Cool

  15. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Aqua Regia Process: Aqua Regia for noble metal etches

  16. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management SulphoNitric Process: SulphoNitric for cleaning, etch

  17. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Nitric Acid Process: Nitric Acid for metallic thin film

  18. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Hydrofluoric Acid 6. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Hydrofluoric Acid 6. Haz Waste Management BOE: Buffered Oxide Etch Process: Highly

  19. TEC Working Group Topic Groups Security | Department of Energy

    Office of Environmental Management (EM)

    and industry representatives and other subject matter experts concerned with secure transport of spent nuclear fuel (SNF) and high level waste (HLW) to Yucca Mountain. Current...

  20. TEC Working Group Topic Groups Section 180(c) | Department of...

    Office of Environmental Management (EM)

    government and to Indian tribes through whose jurisdictions the Department plans to transport spent nuclear fuel or high-level waste to a facility authorized under the Nuclear...

  1. TEC Working Group Topic Groups Rail | Department of Energy

    Office of Environmental Management (EM)

    members will be to assist in the identification of potential rail routes for shipments to Yucca Mountain, in a manner that will contribute to a safe, dynamic, and flexible...

  2. TEC Working Group Topic Groups Rail Archived Documents | Department of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher iSlide 1Greta Kathy Congable (the Appellant) appealspresentmembersEnergy

  3. Focus Group Training Work Group Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015ExecutiveFluorescent Lamp Ballasts Fluorescent LampJanuaryDates: July 10

  4. Focus Group Training Work Group Meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015ExecutiveFluorescent Lamp Ballasts Fluorescent LampJanuaryDates: July

  5. Federal Utility Partnership Working Group Industry Commitment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of 1992 and subsequent...

  6. Federal Utility Partnership Working Group Seminar Agenda

    Energy Savers [EERE]

    * Francis Wheeler, Water Savers, LLC 9:45 am Networking Break 10:15 am NASA Net Zero Energy Buildings Roadmap * Wayne Thalasinos, NASA * Shanti Pless, National Renewable...

  7. Federal Utility Partnership Working Group Agency Participants...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Service Forest Service U.S. Department of Commerce U.S. Department of Defense Defense Logistics Agency U.S. Air Force U.S. Army U.S. Army National Guard U.S. Navy U.S. Department...

  8. Transportation External Coordination Working Group (TEC)

    Office of Environmental Management (EM)

    with a needs assessment, procedure updates, train-the-trainer sessions, tabletop drills and culminating with a full field exercise. Mark Askey provided update on the past...

  9. Transportation External Coordination Working Group (TEC)

    Office of Environmental Management (EM)

    Albuquerque Implementation of User Cut-over Plan The Oak Ridge TRANSCOM Center won't be shut down until the Albuquerque TRANSCOM Communications Center is capable of handling the...

  10. Federal Utility Partnership Working Group Utility Partners |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMC Dan Hooks 912-459-1113 Georgia Carolina Power & Light Bob Dupuis 910-346-1457 North Carolina, South Carolina Cass County Electric Cooperative Marshal Albright...

  11. Federal Utility Partnership Working Group Industry Commitment

    Broader source: Energy.gov [DOE]

    Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of...

  12. Microsoft Word - Project Mgt Working Group Report

    Office of Environmental Management (EM)

    Executive. Align DOE Order 413.3B and DOE Standard 1189 in regards to the 90 percent design criteria for nuclear projects relative to design safety requirements and...

  13. International scoping study: accelerator working group report

    SciTech Connect (OSTI)

    Zisman, Michael; Zisman, M.S.

    2006-09-30

    During the past several years, an International Scoping Study (ISS) of a Neutrino Factory was carried out, with the aim of developing an internationally accepted baseline facility design. Progress toward that goal will be described. Many of the key technical aspects of a Neutrino Factory facility design are presently being investigated experimentally, and the status of these investigations will be mentioned. Plans for the recently launched International Design Study (IDS), which serves as a follow-on to the ISS, will be briefly described.

  14. FINAL Transportation External Coordination Working Group (TEC...

    Office of Environmental Management (EM)

    on DOEEM's decision concerning the proposed consolidated grant, as she and Carol Peabody (DOEEM) had hoped to be able to do. She explained that many changes are currently...

  15. Federal Utility Partnership Working Group Utility Partners |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Bud Clark 903-234-7319 Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas, Virginia, West Virginia AGL Resources Kathy Robb 404-584-4372...

  16. Safety Monitor Joint Working Group (JWG) Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the emergency phone number 119 as well. Dr. Takase pointed out that everyone uses cell phones now; he doubts his staff would use the land line unless there was some...

  17. Federal Utility Partnership Working Group Participants | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a utility energy service contract project. General Services Administration National Aeronautics and Space Administration U.S. Department of Agriculture Agricultural Research...

  18. Aerosol Working Group Contributions Accomplishments for 2006

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L O O D S TA I N P A T T E R N A NA LY S IDOEAerosolContributions

  19. Cloud Properties Working Group Break Out Session

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D BGene NetworkNuclearDNP 20082 P r o j eCommittee of thePresence

  20. Cloud Properties Working Group Low Clouds Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D BGene NetworkNuclearDNP 20082 P r o j eCommittee of

  1. Comments on: UFD Working Group 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11texas-tech-university-mobile-doppler-radars-provide-unique-wind-measurements-to-multi-instrument-doe-field-campaign

  2. September 2012, Training Work Group Status Overview

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummaryDISTDepartment SEMIANNUAL REPORT TO SafetySept 1610-10-08 DC 3.

  3. Interagency Sustainability Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool Fits the BillDepartment of EnergyDemonstration Large BusinessEnergyCoP)

  4. Photoelectrochemical Working Group | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996How to ApplytheExecutive71.1EnergyPhotoEnergyEnergy

  5. 2010-2011 Working Groups website

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDidDevelopmentataboutScalablePhysicist:Possible6

  6. Macro-Industrial Working Group 2

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963Residential2, 2014 MEMORANDUM FOR: JOHN CONTIPeter Gross Office of

  7. Macro-Industrial Working Group 2

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963Residential2, 2014 MEMORANDUM FOR: JOHN CONTIPeter Gross Office of2

  8. Macro-Industrial Working Group: meeting 1

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963Residential2, 2014 MEMORANDUM FOR: JOHN CONTIPeter Gross Office

  9. Macro-Industrial Working Group: meeting 1

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963Residential2, 2014 MEMORANDUM FOR: JOHN CONTIPeter Gross Office4

  10. Macro-Industrial Working Group: meeting 1

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963Residential2, 2014 MEMORANDUM FOR: JOHN CONTIPeter Gross Office430

  11. AEO 2013 Liquid Fuels Markets Working Group

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963 1.969 1.979Coal Consumers THURSDAY, August 27, 2012 Attendance (In

  12. AEO2014 Renewables Working Group Meeting

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963 1.969 1.979Coal Consumers THURSDAY, August 27, 20123 Oil andFOR: John

  13. AEO2015 Coal Working Group Meeting Summary

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963 1.969 1.979Coal Consumers THURSDAY, August 27, 20123 OilPURPOSES. DO

  14. AEO2015 Transportation Working Group Meeting

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963 1.969 1.979Coal Consumers THURSDAY, August 27, 20123

  15. NEMS Buildings Sector Working Group Meeting

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet) Wyoming963Residential2, 2014ProvedYear Jan Feb Mar AprCubic Feet)Rowe:NEMS

  16. Wind Working Group Toolkit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'SHeavyAgencyTendo New EnergyWindState GridWindLtd Jump to:Smart

  17. Safety Monitor Joint Working Group (JWG) Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust, High-Throughput Analysis of Protein1-0845*RV6STATDecember29/2011 Page 1 of 6Site Safety4

  18. Transport Modeling Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing ToolInternational Affairs,Department ofARPA-E Top 10Hydrogen Fuel

  19. Water Electrolysis Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing ToolInternationalReport FY2014 - Employers TakeVoteWater Efficiency CaseWater

  20. Hydrogen Pipeline Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nA Guide to TappingWORKof EnergyResearch TriangleThroughclean

  1. Interagency Working Groups | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nA Guide toIMPROVEMENTGDLB-115) Grant - Special DataEnergyCommission

  2. July 2012, Training Work Group Status Overview

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOE Safety Standards Implementation July 17, 2008 Purpose This analysis

  3. Durability Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i Framing DocumentUnits atis from a BuildingSelf-SchedulersDepartment

  4. Catalysis Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a lCarib Energy (USA)civilEnergy Watertimeplan proposes

  5. EM QA Working Group September 2011 Notes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|DepartmentStatementof Energy LaboratoryAprilAcquisition andSafety

  6. Federal Utility Partnership Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14,Energy 9, 2013Federal Tax Credits:Federalof2 Report

  7. Federal Utility Partnership Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14,Energy 9, 2013Federal Tax Credits:Federalof2

  8. Federal Utility Partnership Working Group Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14,Energy 9, 2013Federal Tax Credits:Federalof23

  9. Federal Utility Partnership Working Group Meeting Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14,Energy 9, 2013Federal TaxMAY 3-4, 2006 ATLANTA,

  10. TEC Working Group Background | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority SustainXSystem for39: Debian189Meetings TECTEC

  11. TEC Working Group Members | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority SustainXSystem for39: Debian189Meetings

  12. Microsoft Word - Project Mgt Working Group Report

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPAEnergy May2.docTechnicalBARACK ofAcquisiti ----FutureGen

  13. Training Work Group Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitle

  14. Indian Country Energy and Infrastructure Working Group

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation StandardsEnergy In2008 |of2013Reserve Bryan Mound

  15. Indian Country Energy and Infrastructure Working Group

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation StandardsEnergy In2008 |of2013Reserve Bryan

  16. Strategic Initiatives Work Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment ofOffice|inWestMayBuilding K-25Kyle Travis,compucowrecently(DOE

  17. Research Highlights Sorted by Working Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) byMultiday Production of SOA in UrbanArctic Haze:IceResearchSubmitter

  18. Sandia Energy - UFD Working Group 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II)GeothermalFuel MagnetizationTransportation Energy

  19. Time Management Managing Time and Tasks

    E-Print Network [OSTI]

    Kunkle, Tom

    Time Management Managing Time and Tasks What is time management? Time can't be managed ­ but you can manage the amount of time you use each day for fun, work, rest, and time spent with others. Why is time management important? You have responsibilities to yourself, to your family and friends, to your

  20. Work breakdown structure guide

    SciTech Connect (OSTI)

    Not Available

    1987-02-06

    Utilization of the work breakdown structure (WBS) technique is an effective aid in managing Department of Energy (DOE) programs and projects. The technique provides a framework for project management by focusing on the products that are being developed or constructed to solve technical problems. It assists both DOE and contractors in fulfilling their management responsibilities. This document provides guidance for use of the WBS technique for product oriented work identification and definition. It is one in a series of policy and guidance documents supporting DOE's project manaagement system.

  1. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. Cancels DOE O 412.1.

  2. Work Authorization System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-04-21

    To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's Planning, Programming, Budgeting, and Evaluation process. Admin Chg 1, dated 5-21-2014, cancels DOE O 412.1A.

  3. Solar Industry at Work | Laila Mattos

    ScienceCinema (OSTI)

    Mattos, Laila

    2013-05-29

    Laila Mattos, a technology manager at Alta Devices, talks about what it means to work for a "disruptive" solar company.

  4. Solar Industry at Work | Laila Mattos

    SciTech Connect (OSTI)

    Mattos, Laila

    2012-01-01

    Laila Mattos, a technology manager at Alta Devices, talks about what it means to work for a "disruptive" solar company.

  5. LFRG Program Management Plan (LFRG PMP)

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay...

  6. Working Copy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are distributed to affected underground repository operations, engineering, and safety managers. 3.1.2 Geosciences Monitoring Program Geosciences document existing geologic...

  7. Spent Fuel Working Group report on inventory and storage of the Department`s spent nuclear fuel and other reactor irradiated nuclear materials and their environmental, safety and health vulnerabilities. Volume 3, Site team reports

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    A self assessment was conducted of those Hanford facilities that are utilized to store Reactor Irradiated Nuclear Material, (RINM). The objective of the assessment is to identify the Hanford inventories of RINM and the ES & H concerns associated with such storage. The assessment was performed as proscribed by the Project Plan issued by the DOE Spent Fuel Working Group. The Project Plan is the plan of execution intended to complete the Secretary`s request for information relevant to the inventories and vulnerabilities of DOE storage of spent nuclear fuel. The Hanford RINM inventory, the facilities involved and the nature of the fuel stored are summarized. This table succinctly reveals the variety of the Hanford facilities involved, the variety of the types of RINM involved, and the wide range of the quantities of material involved in Hanford`s RINM storage circumstances. ES & H concerns are defined as those circumstances that have the potential, now or in the future, to lead to a criticality event, to a worker radiation exposure event, to an environmental release event, or to public announcements of such circumstances and the sensationalized reporting of the inherent risks.

  8. Key Management Challenges in Smart Grid

    SciTech Connect (OSTI)

    Sheldon, Frederick T; Duren, Mike

    2012-01-01

    Agenda Awarded in February 2011 Team of industry and research organizations Project Objectives Address difficult issues Complexity Diversity of systems Scale Longevity of solution Participate in standards efforts and working groups Develop innovative key management solutions Modeling and simulation ORNL Cyber Security Econometric Enterprise System Demonstrate effectiveness of solution Demonstrate scalability

  9. Enrollment Management Annual Report 2011-2012

    E-Print Network [OSTI]

    Fernández-Juricic, Esteban

    PurduePlan powered by Degree Works in January 2013. · Additional Six Sigma process improvement projects around the EM different EM units through Six Sigma-Green Belt training in the summer of 2012. Six Sigma is a business of transfer calls. 4 EMAR 2012 This Year in Enrollment Management Six Sigma group creates data with trebuchets

  10. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Use 3. Pouring and Mixing 4. Hotplates Haz Waste Management

    E-Print Network [OSTI]

    Woodall, Jerry M.

    and Mixing 4. Hotplates Haz Waste Management Process: Once finished with a hazardous chemical, you will need to rinse clean any empty or nearly empty chemical bottles. For hazardous solids, you can discard in the Haz of water. Acceptable Locations For Use: Wet process stations 3, 8, 9, acid & base fume hood2. Additional

  11. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management PAN: Phosphoric, Acetic and Nitric Acids Process: PAN for Aluminum Etch and some cleaning solutions. Materials: Phosphoric Acid (85% wt), Acetic Acid (Glacial Notes: Start with 2 parts water, then pour in 1 part Acetic Acid, followed by 1 part Nitric Acid

  12. *Additional SOPs available, see: 1. PPE Choice and Cleaning 2. Work Station Cleaning 3. Pouring and Mixing 4. Hotplates 5. Haz Waste Management

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    and Mixing 4. Hotplates 5. Haz Waste Management Acetic Acid Process: Acetic Acid for metal etching, polishing and surface modification. Materials: Acetic Acid (Glacial), sometimes diluted with water. Incompatible disposable `Nitridex' nitrile gloves are only splash resistant to concentrated (>40%) Acetic Acid meaning

  13. John Craig (above left), the Department of Biology's greenhouse manager, gives a talk recently to a group of math and science campers,

    E-Print Network [OSTI]

    Lieb, Jason

    and the horns they might see on an elk or white-tailed deer. The department has hosted four groups from for the Town of Chapel Hill's HOPE (Homeless Outreach Poverty Eradication) Garden as well as Carolina Faculty

  14. Global Collaboration on Energy Management 

    E-Print Network [OSTI]

    Brueske, S.

    2015-01-01

    stream_source_info ESL-IE-15-06-36.pdf.txt stream_content_type text/plain stream_size 16268 Content-Encoding UTF-8 stream_name ESL-IE-15-06-36.pdf.txt Content-Type text/plain; charset=UTF-8 June 4, 2015 IETC? slide 1... ENERGY MANAGEMENT WORKING GROUP (EWMG) Global Collaboration on Energy Management Industrial Energy Technology Conference June 3, 2015 Sabine Brueske, Energetics Incorporated; presenting on behalf of Graziella Siciliano, U.S. Department of Energy ESL...

  15. Risk Management in Biopharmaceutical Supply Chains

    E-Print Network [OSTI]

    Ma, Yao

    2011-01-01

    Supply Chain Risk Managementof Recent Work on Supply Chain Risk Management . . . . .M. , Supply chain risk management: Outlining an agenda for

  16. A qualitative study of the relationship of personality type with career management and career choice preference in a group of bioscience postgraduate students and postdoctoral researchers

    E-Print Network [OSTI]

    Blackford, Sarah

    2010-01-01

    , considerate, kind, observant, factual INFP Idealistic Sensitive, concerned, caring, curious, long-range vision INTP Logical analytical, mentally quick, insightful, ingenious, ideas ESTP Action-orientated practical, realistic, straightforward, assertive... Learning Educational department. She reported a personality type of ISTP which reflects a preference for a flexible, problem-solving work environment. She reported being very happy with her work which involves teaching students and staff about...

  17. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  18. Bio-Derived Liquids to Hydrogen Distributed Reforming Working...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Hydrogen Distributed Reforming Working Group (BILIWG) on October 24, 2006, in Baltimore, Maryland. The Working Group is addressing technical challenges to distributed...

  19. Bio-Derived Liquids to Hydrogen Distributed Reforming Working...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Purification Working Group (PURIWG) & Hydrogen Production Technical Team Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group (BILIWG), Hydrogen Separation...

  20. EWB Facilitator Position Descriptions Facilitators will manage a group of 3-5 Vice-Presidents. They will run bi-weekly meetings with these Vice-

    E-Print Network [OSTI]

    Ellis, Randy

    and communication aspects of the Chapter's ventures and projects. Strong communication and networking skills would-Presidents. They will also be responsible for guiding the entire Enabling Facilitation Group in organization of the large at Queen's, which will involve networking with administration and catering services as well as the Canadian

  1. Fermilab: Science at Work

    ScienceCinema (OSTI)

    Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

    2013-02-14

    Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

  2. Fermilab: Science at Work

    SciTech Connect (OSTI)

    Brendan Casey; Herman White; Craig Hogan; Denton Morris; Mary Convery; Bonnie Fleming; Deborah Harris; Dave Schmitz; Brenna Flaugher; Aron Soha

    2013-02-01

    Six days. Three frontiers. One amazing lab. From 2010 to 2012, a film crew followed a group of scientists at the Department of Energy's Fermilab and filmed them at work and at home. This 40-minute documentary shows the diversity of the people, research and work at Fermilab. Viewers catch a true behind-the-scenes look of the United States' premier particle physics laboratory while scientists explain why their research is important to them and the world.

  3. Microsoft Word - Summary of Rail Comparison for Topic Group 7...

    Office of Environmental Management (EM)

    of the TEC Working Group Rail Topic Group report entitled "Transportation Safety WIPP-PIG Rail Comparison" In 1999, the Transportation External Coordination (TEC) Working...

  4. Line Management Perspective: Office of Environmental Management (EM)

    Broader source: Energy.gov [DOE]

    Slide Presentation by Matthew Moury, Deputy Assistant Secretary for Safety, Security and Quality Programs, Office of Environmental Management. EFCOG Integrated Safety Management Work Planning and Control.

  5. Policy Research Working Paper 5710 Crossing Boundaries

    E-Print Network [OSTI]

    Gertz, Michael

    Development Team & Poverty Reduction and Economic Management Network Poverty Reduction and Equity June 2011 and Rural Development Team, Development Research Group; and the Poverty Reduction and Equity, Poverty

  6. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricNCubictheThepresented in the7 Table7Work &Work Plan

  7. WORKING PAPER Resource Economics

    E-Print Network [OSTI]

    WORKING PAPER 2008-07 REPA Resource Economics & Policy Analysis Research Group Department of Economics University of Victoria Forest-mill integration: a transaction costs perspective Kurt Niquidet, Moeltne, and Johnson) 2003-06 ­ Climate Change and Forest Ecosystem Sinks: Economic Analysis (van Kooten

  8. Collected Works

    E-Print Network [OSTI]

    Turner, Lance

    2011-04-26

    The collection of work presented here illustrates the constant struggle individuals face in understanding the repercussions of their past, the weight of their decisions in the present moment, and the possibilities of the ...

  9. Toward Strategic Watershed Management

    E-Print Network [OSTI]

    Toward Strategic Watershed Management: Lessons from the Boone River Watershed Program Evaluation Resources Ecology and Management June, 2013 #12;2 Introduction Water quality is a growing problem throughout management on private and working lands. The Iowa Soybean Association (ISA) began work in the Boone River

  10. Nuclear Suppliers Group & Regimes | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Suppliers Group & Regimes | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the...

  11. ISSUANCE 2015-07-31: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Intent to Establish a Working Group for Certain Equipment Classes of Refrigeration Systems of Walk-in Coolers and Freezers to Negotiate a Notice of Proposed Rule

    Broader source: Energy.gov [DOE]

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Intent to Establish a Working Group for Certain Equipment Classes of Refrigeration Systems of Walk-in Coolers and Freezers to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards

  12. Business, management and finance

    E-Print Network [OSTI]

    Sussex, University of

    Business, management and finance Essentials Taught degrees Masters in Business Administration (MBA and Finance MSc in Managing Innovation and Projects MSc in Technology and Innovation Management Research 156-157 MBA You will have at least three years' management experience in a professional work

  13. thesis work

    E-Print Network [OSTI]

    Toback, David

    thesis work Aggie student given award for thesis on particle physics&M. Wagner accepted the Universities Research Association (URA) Thesis Award June 4 for his doctoral,500 award, is given each year to the most outstanding doctoral thesis written on research conducted

  14. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department`s plutonium storage. Volume II, Appendix B, Part 9: Oak Ridge site site team report

    SciTech Connect (OSTI)

    1994-09-01

    This report provides the input to and results of the Department of Energy (DOE) - Oak Ridge Operations (ORO) DOE Plutonium Environment, Safety and Health (ES & H) Vulnerability Assessment (VA) self-assessment performed by the Site Assessment Team (SAT) for the Oak Ridge National Laboratory (ORNL or X-10) and the Oak Ridge Y-12 Plant (Y-12) sites that are managed by Martin Marietta Energy Systems, Inc. (MMES). As initiated (March 15, 1994) by the Secretary of Energy, the objective of the VA is to identify and rank-order DOE-ES&H vulnerabilities associated for the purpose of decision making on the interim safe management and ultimate disposition of fissile materials. This assessment is directed at plutonium and other co-located transuranics in various forms.

  15. Solar Access Public Capital (SAPC) Working Group: Best Practices in PV Operations and Maintenance; Version 1.0, March 2015; Period of Performance, January 1, 2014 - December 31, 2015

    SciTech Connect (OSTI)

    Keating, T. J.; Walker, A.; Ardani, K.

    2015-03-01

    This PV O&M Best Practices Guide is designed to improve solar asset transparency for investors and rating agencies, provide an industry framework for quality management, and reduce transaction costs in the solar asset securitization process. The PV O&M Best Practices Guide is intended to outline the minimum requirements for third-party ownership providers (“Providers”). Adherence to the guide is voluntary. Providers that adhere to the guide are responsible for selfcertifying that they have fulfilled the guide requirements.

  16. Hazardous Working Policy November 2012

    E-Print Network [OSTI]

    Doran, Simon J.

    for: The management of University workers performing hazardous tasks or working in hazardous areas;2 Hazardous Areas: are areas where a University worker may be exposed to risks that are considered greater1 Hazardous Working Policy November 2012 Introduction The University of Surrey acknowledges

  17. 1. I look forward to meeting anyone who is interested in working for an environmental advocacy group this Friday at the career fair.about 16 hours ago via Mobile Web

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    group this Friday at the career fair.about 16 hours ago via Mobile Web 2. I hope that everyone enjoyed hearing about a day of my life as an environmental advocate.about 16 hours ago via Mobile Web 3. Now via Mobile Web 4. Writing follow up emails to everyone I spoke with today.about 17 hours ago via

  18. FY 2013 Conference Waiver - Emergency Management Issues Special...

    Office of Environmental Management (EM)

    3 Conference Waiver - Emergency Management Issues Special Interest Group FY 2013 Conference Waiver - Emergency Management Issues Special Interest Group FY 2013 Conference Waiver -...

  19. Federal Energy and Water Management Award Winner 22nd Operations...

    Energy Savers [EERE]

    Federal Energy and Water Management Award Winner 22nd Operations Group Fuel Efficiency Office Federal Energy and Water Management Award Winner 22nd Operations Group Fuel Efficiency...

  20. Superfund record of decison (EPA Region 4): USDOE Paducah Gas Diffusion Plant, Solid Waste Management Units 2 and 3 of Waste Area Group 22, Paducah, KY, August 22, 1995

    SciTech Connect (OSTI)

    NONE

    1995-09-01

    This decision document presents the selected interim remedial action for Solid Waste Management Units (SWMUs) 2 and 3 of Waste Area Group (WAG) 22 at the Paducah Gaseous Diffusion Plant (PGDP) near Paducah, Kentucky. The primary objective of this interim remedial action, or corrective measure, is to reduce the infiltration of precipitation into buried waste and mitigate any leaching of chemicals of concern from the wastes while the DOE collects additional data to support evaluation of a final remedial action. The prinicipal threat associated with SWMU 2 is the potential for transport of contaminants to the ground water operable unit and subsequent threats associated with the potential contamination of an aquifer and transport of contaminants beyond DOE property.