Powered by Deep Web Technologies
Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Use of gene probes to assess the impact and effectiveness of aerobic in situ bioremediation of TCE  

E-Print Network [OSTI]

and tetrachloroethylene (PCE) are primarily volatile organicfluid. Exposure to TCE and PCE over extended periods hasof 5 ppb of both TCE and PCE in drinking water in the United

Hazen, Terry C.

2009-01-01T23:59:59.000Z

2

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

3

Energy Management in Olefins Units  

E-Print Network [OSTI]

to the point where waste heat from pyrolysis generates more than enough steam to power the olefins unit recovery section. Furthermore, incorporating gas turbine driven electrical generators or process compressors adds to the utility export potential of the unit...

Wells, T. A.

1982-01-01T23:59:59.000Z

4

Corrective Action Management Units and Temporary Units. RCRA Information Brief  

SciTech Connect (OSTI)

On February 16, 1993 the EPA published a final rule that allows either the EPA Regional Administrator or the authorized State to designate areas as corrective action management units (CAMUs) at hazardous waste management facilities for the specific purpose of managing remediation waste that has been generated as part of the facility`s corrective action activities. According to the rule, placement of remediation wastes into or within a CAMU does not constitute land disposal of hazardous waste and is not subject to RCRA land disposal restrictions. In addition, waste disposal units located within CAMUs are not required to be designed in accordance with RCRA minimum technological requirements applicable to land disposal units. This Information Brief explains the advantages of a CAMU designation, defines a Temporary Unit (TU) and explains the advantages of a TU designation. The process for initiating a CAMU or TU designation is described for DOE sites and interim status facilities.

Not Available

1994-03-01T23:59:59.000Z

5

INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT  

SciTech Connect (OSTI)

The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

2011-05-31T23:59:59.000Z

6

Cometabolic Degradation of TCE Vapors in a Foamed Emulsion  

E-Print Network [OSTI]

A R C A . D E S H U S S E S * Department of Chemical and Environmental Engineering, University resulting in widespread contamination of soil, groundwater, and air (1, 2). TCE is a significant to complete degradation of TCE to harmless end products. Unfortunately, no microorganism can grow on TCE

7

Managing nuclear weapons in the United States  

SciTech Connect (OSTI)

This report discusses the management and security of nuclear weapons in the post-cold war United States. The definition of what constitutes security is clearly changing in the US. It is now a much more integrated view that includes defense and the economy. The author tries to bring some semblance of order to these themes in this brief adaptation of a presentation.

Miller, G.

1993-03-16T23:59:59.000Z

8

Fenton Oxidation of TCE Vapors in a Foam Reactor  

E-Print Network [OSTI]

bioreactors and was comparable to those of advanced oxidation techniques such as TiO2/UV and ozone/UV, it is difficult for most chlorinated solvents. Biological treatment using cometabolic degradation was found of TCE bio- degradation intermediates [7, 8]. On the other hand, advanced oxidation processes provide

9

Unit costs of waste management operations  

SciTech Connect (OSTI)

This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

1994-04-01T23:59:59.000Z

10

An overview of the corrective action management unit and temporary unit regulations  

SciTech Connect (OSTI)

In February 1993, the US Environmental Protection Agency (EPA) promulgated the corrective action management unit (CAMU) and temporary unit (TU) regulations as 40 CFR Part 264, Subpart S. These regulations are intended to foster the selection of protective and cost-effective remedies for the restoration of sites contaminated by hazardous substances, hazardous wastes, and hazardous waste constituents by removing certain regulatory impediments to implementing those remedies, most notably those of the land disposal restrictions (LDRs). This paper provides a brief overview of the CAMU and TU regulations.

Green, D.R. [Argonne National Lab., IL (United States); Corathers, L. [Pacific Northwest Lab., Richland, WA (United States); Coalgate, J. [USDOE, Washington, DC (United States)

1995-03-01T23:59:59.000Z

11

Integrated Waste Treatment Unit GFSI Risk Management Plan  

SciTech Connect (OSTI)

This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

W. A. Owca

2007-06-21T23:59:59.000Z

12

Managing Suburban Coyotes  

E-Print Network [OSTI]

Extension cooperating with the United States Department of Agriculture? Animal and Plant Health Inspection Service?Wildlife Services. TCE?Wildlife Services P.O. Box 100410 ? San Antonio, Texas 78201-1710 1.2M,Reprint ...

Texas Wildlife Services

2007-05-23T23:59:59.000Z

13

PPPO-02-427-07 Revised Solid Waste Management Unit Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6&D1 Secondary Document C-755-GSA-23 Located at C-755 Near the East Fence Line Solid Waste Management Unit Assessment Report UNIT NUMBER: 551 DATE OF ORIGINAL SAR: 12303 DATE OF...

14

PPPO-02-427-07 Revised Solid Waste Management Unit Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

O7-0023&D1 Secondary Document G-746-S-01 GSA Next to the Sanitary Landfill Solid Waste Management Unit Assessment Report UNIT NUMBER: 415 DATE OF ORIGINAL SAR: 011901 DATE OF SAR...

15

PPPO-02-427-07 Revised Solid Waste Management Unit Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area for Concrete Piers, Rubble, and Wood on the North Side of C-745-B Cylinder Yard Solid Waste Management Unit Assessment Report UNIT NUMBER: 548 DATE OF ORIGINAL SAR: 627...

16

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Broader source: Energy.gov [DOE]

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

17

IN SITU CHEMICAL AND BIOLOGICAL TREATMENT OF TCE IN GROUNDWATER AT A LEGACY RAILROAD SITE  

E-Print Network [OSTI]

.0 1.5 2.0 2.5 3.0 -50 0 50 100 150 200 250 300 350 400 Ethene(mol/L) PCE,TCE,DCE,VC(mol/L) Days (Day 0 = July 18, 2013) MW-19 Molar Concentration PCE TCE Total DCE VC Total ethene #12;Results 0.00 0.20 0.40 0 300 350 400 Ethene(mol/L) PCE,TCE,DCE,VC(mol/L) Days (Day 0 = July 15, 2013) MW-26 Molar Concentration

Illinois at Urbana-Champaign, University of

18

Service Contract (Rev 1/8/06) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Service Contract (Rev 1/8/06) No: Unit: Date Page 1 Contract Manager: Agreement between) and any other regulation, statutory instrument or other #12;Service Contract (Rev 1/8/06) No: Unit: Date Page 2 Contract Manager: subordinate legislation made thereunder or pursuant thereto, and any codes

19

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilityís Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

20

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilityís Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMEDís guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

22

PPPO-02-340-07 Revised Solid Waste Management Unit Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7&D1 Secondary Document C-747 Contaminated Burial Yard and C-748-B Burial Area Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 4 DATE OF ORIGINAL SAR: 824...

23

PPPO-02-296-08 Revised Solid Waste Management Unit Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6-P and C-746-P1 Scrap Yards Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 13 DATE OF ORIGINAL SAR: 8241987 DATE OF SAR REVISION: 123107 REGULATORY...

24

H-340-01 Solid Waste Management Unit (SWMU) Assessment Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

340-01 Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 566 DATE OF ORIGINAL SAR: 12110 DATE OF SAR REVISIONS: NA REGULATORY STATUS: SWMU LOCATION: C-340...

25

United States of America Department of Energy Environmental Management Advisory Committee Public Meeting  

SciTech Connect (OSTI)

This reports contains documentation of presentations given at the United States of America Department of Energy Environmental Management Advisory Committee Public Meeting held December 14--15, 1993 in Alexandria, Virginia.

Not Available

1993-12-01T23:59:59.000Z

26

action management unit: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the true digital controller, locatedin Chapman, Patrick 32 In Situ Bioremediation Interim Remedial Action Report, Test Area North, Operable Unit 1-07B CiteSeer Summary: This...

27

In situ, subsurface monitoring of vapor-phase TCE using fiber optics  

SciTech Connect (OSTI)

A vapor-phase, reagent-based, fiber optic trichloroethylene (TCE) sensor developed by Lawrence Livermore National Laboratory (LLNL) was demonstrated at the Savannah River Site (SRS) in two configurations. The first incorporated the sensor into a down-well instrument bounded by two inflatable packers capable of sealing an area for discrete depth analysis. The second involved an integration of the sensor into the probe tip of the Army Corps of Engineers Waterways Experiment Station (WES) cone penetrometry system. Discrete depth measurements of vapor-phase concentrations of TCE in the vadose zone were successfully made using both configurations. These measurements demonstrate the first successful in situ sensing (as opposed to sampling) of TCE at a field site.

Rossabi, J. [Westinghouse Savannah River Co., Aiken, SC (United States); Colston, B. Jr.; Brown, S.; Milanovich, F. [Lawrence Livermore National Lab., CA (United States); Lee, L.T. Jr. [Army Engineer Waterways Experiment Station, Vicksburg, MS (United States). Geotechnical Lab.

1993-03-05T23:59:59.000Z

28

Unit 10: Software Quality To introduce software quality management and  

E-Print Network [OSTI]

. ¬• ISO 9001 Quality Systems - Model for Quality Assurance in Design/Development, Production, Installation intervals by management to ensure its continuing suitability, effectiveness and conformance with ISO 9001 with particular reference to the requirements of ISO 9000 and associated standards. √ź To introduce QFD

Finkelstein, Anthony

29

United States-Russia: Environmental management activities, Summer 1998  

SciTech Connect (OSTI)

A Joint Coordinating Committee for Environmental Restoration and Waste Management (JCCEM) was formed between the US and Russia. This report describes the areas of research being studied under JCCEM, namely: Efficient separations; Contaminant transport and site characterization; Mixed wastes; High level waste tank remediation; Transuranic stabilization; Decontamination and decommissioning; and Emergency response. Other sections describe: Administrative framework for cooperation; Scientist exchange; Future actions; Non-JCCEM DOE-Russian activities; and JCCEM publications.

NONE

1998-09-01T23:59:59.000Z

30

United: How one computer model makes Texas surface water management possible  

E-Print Network [OSTI]

Story by Leslie Lee Summer 2013 tx H2O 3 Photo by Kathleen Phillips, Texas A&M AgriLife UNITED How one computer model makes Texas surface water management possible Managing surface water supplies in Texas is complex, to say the least. Multiple... of conditions. W#15;P enables surface water managers throughout Texas to allocate water resources, plan for the future and ensure there is enough water for environmental as well as human needs. A statewide surface water permitting system is born Prior...

Lee, Leslie

2013-01-01T23:59:59.000Z

31

Contract for Consultancy Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Consultancy Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of CONSULTANCY SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 The Contract Commencement

32

Contract for Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of SERVICES (NON OPERATIONS) between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 [The Contract Commencement

33

Contract for Consultancy Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Consultancy Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of CONSULTANCY SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 [The Contract Commencement

34

Contract for Harvesting Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Harvesting Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of HARVESTING SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 [The Contract Commencement

35

Contract for Goods (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Goods (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of GOODS (and any related Services) between Services) to the Commission in accordance with and subject to the provisions of this Contract. 2 [The

36

Contract for Harvesting Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Harvesting Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of HARVESTING SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 The Contract Commencement

37

Contract for Haulage Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Haulage Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of HAULAGE SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 [The Contract Commencement

38

Contract for Operational Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Operational Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of SERVICES (OPERATIONAL) between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 The Contract Commencement

39

Contract for Haulage Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Haulage Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of HAULAGE SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 The Contract Commencement

40

Contract for Goods (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Goods (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of GOODS (and any related Services) between Services) to the Commission in accordance with and subject to the provisions of this Contract. 2

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Managing Static Leakage Energy in Microprocessor Functional Units Steven Dropshoy, Volkan Kursun, David H. Albonesi,  

E-Print Network [OSTI]

; by New York State Office of Science, Technology & Academic Re­ search to the Center for AdvancedManaging Static Leakage Energy in Microprocessor Functional Units #3; Steven Dropshoy, Volkan energy due to subthreshold leakage current is pro­ jected to become a major component of the total energy

Dwarkadas, Sandhya

42

Clearwater Subbasin Assessment 360 November 2003 9 Resource Synthesis and Definition of Potential Management Units  

E-Print Network [OSTI]

management units. For the purposes of planning at the subbasin scale, and given limitations in data availability and accuracy based on the broad scale nature of this assessment, subjective PMU delineations (Table 66). Due to the large amount of information being synthesized, raw data were often categorized (e

43

Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary  

SciTech Connect (OSTI)

This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure of each of the following hazardous waste management units regulated under RCRA.

Not Available

1990-06-01T23:59:59.000Z

44

THE POLICY CONTEXT: How do Canada, the United States, and Mexico Apply Science to Manage the O3  

E-Print Network [OSTI]

the O3 Pollution Problem? Air-quality policy makers in the United States, Canada, and MexicoCHAPTER 2 THE POLICY CONTEXT: How do Canada, the United States, and Mexico Apply Science to Manage mitigation in Canada, the United States, and Mexico have been specified as standards (which have direct

45

Public health assessment for Newton County Wells (a/k/a Silver Creek TCE), Joplin, Jasper County, Missouri, Region 7: CERCLIS number MOD985798339. Final report  

SciTech Connect (OSTI)

The Newton County TCE site contains an uncontrolled groundwater plume of trichloroethylene (TCE) contamination. The source of contamination is believed to be FAG Bearings. From 1973 to 1982, FAG Bearings produced ball bearings using TCE as a commercial degreaser. It is alleged that improper disposal and leaks of an alleged closed system of TCE led to the contamination of soil at the industrial site, the groundwater aquifer, and subsequently, 82 private water wells. Exposure pathways at the site consist of inhalation of, ingestion of, and dermal contact with TCE-contaminated groundwater and surface water. Because completed and potential exposure pathways exist, the Newton County TCE site has been classified as a Public Health Hazard.

NONE

1999-07-19T23:59:59.000Z

46

Fluid Management Plan Central Nevada Test Area Corrective Action Unit 443  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing at sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. Responsibility for environmental restoration of the sites that constitute the Offsites Project was transferred from the DOE Office of Environmental Management to the DOE Office of Legacy Management (LM) on October 1, 2006. The scope of this Fluid Management Plan (FMP) is to support subsurface investigations at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996). The subsurface CAU 443 is associated with the underground nuclear testing conducted at UC-1 and is located approximately 30 miles north of Warm Springs in Nye County, Nevada.

None

2009-01-01T23:59:59.000Z

47

Development of a Carbon Management Geographic Information System (GIS) for the United States  

SciTech Connect (OSTI)

In this project a Carbon Management Geographical Information System (GIS) for the US was developed. The GIS stored, integrated, and manipulated information relating to the components of carbon management systems. Additionally, the GIS was used to interpret and analyze the effect of developing these systems. This report documents the key deliverables from the project: (1) Carbon Management Geographical Information System (GIS) Documentation; (2) Stationary CO{sub 2} Source Database; (3) Regulatory Data for CCS in United States; (4) CO{sub 2} Capture Cost Estimation; (5) CO{sub 2} Storage Capacity Tools; (6) CO{sub 2} Injection Cost Modeling; (7) CO{sub 2} Pipeline Transport Cost Estimation; (8) CO{sub 2} Source-Sink Matching Algorithm; and (9) CO{sub 2} Pipeline Transport and Cost Model.

Howard Herzog; Holly Javedan

2009-12-31T23:59:59.000Z

48

Use of gene probes to assess the impact and effectiveness of aerobic in situ bioremediation of TCE  

SciTech Connect (OSTI)

Gene probe hybridization was used to determine distribution and expression of co-metabolic genes at a contaminated site as it underwent in situ methanotrophic bioremediation of trichloroethylene (TCE). The bioremediation strategies tested included a series of air, air:methane, and air:methane:nutrient pulses of the test plot using horizontal injection wells. During the test period, the levels of TCE reduced drastically in almost all test samples. Sediment core samples (n = 367) taken from 0 m (surface)-43 m depth were probed for gene coding for methanotrophic soluble methane monooxygenase (sMMO) and heterotrophic toluene dioxygenase (TOD), which are known to co-metabolize TCE. The same sediment samples were also probed for genes coding for methanol dehydrogenase (MDH) (catalyzing the oxidation of methanol to formaldehyde) to assess specifically changes in methylotrophic bacterial populations in the site. Gene hybridization results showed that the frequency of detection of sMMO genes were stimulated approximately 250% following 1% methane:air (v/v) injection. Subsequent injection of 4% methane:air (v/v) resulted in an 85% decline probably due to nutrient limitations, since addition of nutrients (gaseous nitrogen and phosphorus) thereafter caused an increase in the frequency of detection of sMMO genes. Detection of TOD genes declined during the process, and eventually they were non-detectable by the final treatment, suggesting that methanotrophs displaced the TOD gene containing heterotrophs. Active transcription of sMMO and TOD was evidenced by hybridization to mRNA. These analyses combined with results showing the concomitant decline in TCE concentrations, increases in chloride concentration and increases in methanotroph viable counts, provide multiple lines of evidence that TCE remediation was caused specifically by methanotrophs. Our results suggest that sMMO genes are responsible for most, if not all, of the observed biodegradation of TCE. This study demonstrates that the use of nucleic acid analytical methods provided a gene specific assessment of the effects of in situ treatment technologies.

Hazen, Terry C.; Chakraborty, Romy; Fleming, James M.; Gregory, Ingrid R.; Bowman, John P.; Jimenez, Luis; Zhang, Dai; Pfiffner, Susan M.; Brockman, Fred J.; Sayler, Gary S.

2009-03-15T23:59:59.000Z

49

Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

NONE

1996-04-01T23:59:59.000Z

50

Implementing the Corrective Action Management Unit at Sandia National Laboratories, New Mexico  

SciTech Connect (OSTI)

In September 1997, following significant public and regulator interaction, Sandia Corporation (Sandia) was granted a Resource Conservation and Recovery Act (RCRA) and Hazardous Solid Waste Amendment (HSWA) permit modification allowing construction and operation of a Correction Action Management Unit (CAMU). The CAMU follows recent regulatory guidance that allows for cost-effective, expedient cleanup of contaminated sites and management of hazardous remediation wastes. The CAMU was designed to store, treat, and provide long-term management for Environmental Restoration (ER) derived wastes. The 154 square meter CAMU site at Sandia National Laboratories, New Mexico (SNL/NM), includes facilities for storing bulk soils and containerized wastes, for treatment of bulk soils, and has a containment cell for long-term disposition of waste. Proposed treatment operations include soil washing and low temperature thermal desorption. The first waste was accepted into the CAMU for temporary storage in January 1999. Construction at the CAMU was completed in March 1999, and baseline monitoring of the containment cell has commenced. At completion of operations the facility will be closed, the waste containment cell will be covered, and long-term post-closure monitoring will begin. Sandia's CAMU is the only such facility within the US Department of Energy (DOE) complex. Implementing this innovative approach to ER waste management has required successful coordination with community representatives, state and federal regulators, the DOE, Sandia corporate management, and contractors. It is expected that cost savings to taxpayers will be significant. The life-cycle CAMU project cost is currently projected to be approximately $12 million.

MOORE,DARLENE R.; SCHRADER,SCOTT A.; KING,GABRIEL G.; CORMIER,JOHN

2000-01-26T23:59:59.000Z

51

Current Status of the United Kingdom Programme for Long-Term Radioactive Waste Management  

SciTech Connect (OSTI)

In 1997, the UK programme for the deep disposal of radioactive waste was ''stopped dead in its tracks'' with the refusal by the Secretary of State for the Environment to allow Nirex to go ahead with its plans for an underground Rock Characterisation Facility at Sellafield in north-west England. Since that time a House of Lords' Select Committee has held an inquiry into what went wrong and what the way ahead should be. In addition, Nirex and the nuclear industry players have also been analyzing the past with a view to learning from the experience in taking things forward. In Nirex's view this is essentially an ethical issue; the waste exists and we should deal with it in this generation. Three areas need to be better addressed if a successful program of management of the nation's radioactive waste is to be achieved: the process of how policy development and implementation can be achieved; the structure of the nuclear industry and its relationship to the waste management organization; and the behavior of the players in their interaction with stakeholders. All three are underpinned by the need for transparency. In recognition that developing a policy for managing radioactive waste has to be achieved with the support of all stakeholders, the Government instigated a consultation exercise in September 2001. The initial phase of this initiative is essentially a consultation about consultation and is intended to decide on how the next stages of a six year policy development program should be addressed. In addition to this exercise, the Government is undertaking a fundamental review of the structuring of the United Kingdom Atomic Energy Authority (UKAEA) and British Nuclear Fuels plc (BNFL). They are both shareholders in Nirex and in November 2001 the Government announced the setting up of a Liabilities Management Authority (LMA) to manage the long-term nuclear liabilities that are publicly owned, particularly through those organizations. The future of Nirex will be directly influenced by the outcome of these reviews.

Murray, C. H.; Hooper, A. J.; Mathieson, J.

2002-02-27T23:59:59.000Z

52

Hydraulic Containment of TCE Contaminated Groundwater at the DOE Portsmouth Gaseous Diffusion Plant  

SciTech Connect (OSTI)

This paper will describe the progress of a groundwater remedial action at the Portsmouth Gaseous Diffusion Plant (PORTS), a Department of Energy (DOE) facility that enriched uranium from the early 1950's until 2000. The X-749 southern boundary hydraulic containment system, combining a four-well extraction system with a previously constructed subsurface barrier wall, has been employed at PORTS. The hydraulic containment project has been implemented as part of containment and remediation of the X-749/X-120 area trichloroethylene (TCE) contaminant. The X-749/X-120 groundwater contaminant plume is located in the south central section (Quadrant I) of the PORTS facility. The plume is associated with the former X-120 Goodyear Training Facility and a landfill known as the X-749 Contaminated Materials Disposal Facility. The principal contaminants of concern are chlorinated solvents (primarily TCE) and technetium-99 (Tc-99). A subsurface barrier wall (X-749 South Barrier Wall) was completed in 1994 at the PORTS southern reservation boundary as an interim remedial measure to slow the advancement of the leading edge of the contaminated groundwater plume or to prevent the plume from migrating off DOE property. Remedial measures identified by Ohio Environmental Protection Agency (Ohio EPA) included installation of a barrier wall around the eastern and southern portions of the X-749 landfill to provide source control and installation of a phyto-remediation system to help contain groundwater flow and remove volatile organic compounds. Previous remedial measures that were implemented as elements of 'closures' on the X-749 landfill included a multimedia cap, barrier walls, and a groundwater collection system. Despite these measures, the X-749/X-120 groundwater plume has migrated beyond the southern DOE property boundary. Current TCE concentrations in off-site groundwater monitoring wells are below the preliminary remediation goal and drinking water maximum contaminant level for TCE of 5 {mu}g/kg, but continue to increase. Hydraulic containment was selected as the method for controlling the plume at the southern DOE property boundary. Recent borings and pumping tests indicate that approximately a 400-foot section of the existing subsurface barrier wall near the DOE property boundary may been improperly keyed into the Sunbury Shale bedrock which underlies the unconsolidated uppermost Gallia sand and gravel aquifer (Gallia). This gap is reported to be as much as 4 vertical feet. In addition, the X-749 groundwater plume is migrating around the western end of the X-749 South Barrier Wall. Four groundwater extraction wells were installed at the DOE property boundary to provide hydraulic control of the plume currently flowing under and around the existing subsurface barrier wall. Placement of the new extraction wells was based on groundwater modeling and data collected from pumping tests in the area. The extracted groundwater is being sent to the on-site X-622 Groundwater Treatment Facility via subsurface piping. The hydraulic containment system began operation in June 2007. The preliminary water elevations from monitoring wells in the vicinity of two of the four extraction wells demonstrate a significant decrease in groundwater potentiometric head in the southern boundary area. The current extraction rates should be adequate to contain the leading edge of the contaminant plume. Monitoring wells in the area will continue to be sampled on a quarterly basis. (authors)

Lewis, A.C.; Rieske, D.P.G.; Baird, D.R.P.E. [CDM, Piketon, OH (United States)

2008-07-01T23:59:59.000Z

53

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan  

SciTech Connect (OSTI)

This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition.

G. L. Schwendiman

2006-07-01T23:59:59.000Z

54

Corrective action management unit application for the Environmental Restoration Disposal Facility  

SciTech Connect (OSTI)

The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

Evans, G.C.

1994-06-01T23:59:59.000Z

55

Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal  

SciTech Connect (OSTI)

This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

Not Available

1994-01-01T23:59:59.000Z

56

Bordering on Water Management: Ground and Wastewater in the United States - Mexico Transboundary Santa Cruz Basin  

E-Print Network [OSTI]

Environmental Board (2005). Water Resources Management onEnvironmental Valuation and Its Economic Critics. Journal of Water Resources Planning and Management,Environmental Cooperation Commission, has encouraged unilateral decision making, as water management

Milman, Anita Dale

2009-01-01T23:59:59.000Z

57

WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern.  

SciTech Connect (OSTI)

This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

Washington TRU Solutions LLC

2000-05-23T23:59:59.000Z

58

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NAME C-740 TCE Soill Site REGULATORY STATUS: AOC LOCATION: Northwest corner C-740 concrete pad area) APPROXIMATE DIMENSIONS: 5 ft by 5 ft spill FUNCTION: Drum storage area l...

59

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

basement floor on stanchions. TCE from the C-720 degreaser was drained via aboveground piping to the C-720 compressor pit water storage tank (swmu 31), which i s located outside...

60

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

SciTech Connect (OSTI)

his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

62

United States Department of Energy Environmental Management Advisory Board: Public meeting  

SciTech Connect (OSTI)

This meeting of the Environmental Management Advisory Board was held to discuss environmental concerns that everybody has and to provide a strategy for dealing with the problems. Plans for the Environmental Management Programmatic Environmental Impact Statement are presented. A report is included of the subcommittee on institutional barriers to advanced technology use. The subcommittee on environmental restoration cost effectiveness also presents a report. The status of public involvement activities is evaluated. A presentation on the status of spent fuel management is included.

Not Available

1994-07-15T23:59:59.000Z

63

Agility and Risk Management at Pacific Life: Optimizing Business Unit Autonomy  

E-Print Network [OSTI]

Pacific Life is a diversified financial services company with a history of autonomous business units. Pacific Life had five independent divisions, including Life Insurance, Annuities and Mutual Funds, and Investments. These ...

Ross, Jeanne W.

2007-12-01T23:59:59.000Z

64

Bordering on Water Management: Ground and Wastewater in the United States - Mexico Transboundary Santa Cruz Basin  

E-Print Network [OSTI]

have been caused to a lack of water; rather it is believedconsider how, given a lack of clear water management goals,incomplete due to a lack of surface water measurements. Not

Milman, Anita Dale

2009-01-01T23:59:59.000Z

65

United States of America, Department of Energy Environmental Restoration and Waste Management Advisory Committee Public Meeting  

SciTech Connect (OSTI)

This report is a transcript of the public hearing of the US DOE Environmental Restoration and Waste Management Advisory Committee held in Golden, Colorado June 16--18, 1993.

Not Available

1993-07-01T23:59:59.000Z

66

Identifying the Predictors of Female Project Managers' Salaries in the United States  

E-Print Network [OSTI]

This study seeks to explore the predictors of female project managersí salary in the construction industry, and to analyze their impacts on determining the salary. Experience, age, marital status, motherhood, having children at home, and the number...

Kamranzadeh, Amineh

2012-11-30T23:59:59.000Z

67

ESM 201 Ecology of Managed Ecosystems (4.0 units) Fall 2011 Tues, Thurs 8:30 -9:45am; Bren Hall 1414  

E-Print Network [OSTI]

ESM 201 Ecology of Managed Ecosystems (4.0 units) Fall 2011 Tues, Thurs 8:30 - 9:45am; Bren Hall@bren.ucsb.edu) This course covers principles of individual, population, community, and ecosystem ecology, with an emphasis on applications (conservation, resource management, ecological effects of pollution and habitat fragmentation, etc

California at Santa Barbara, University of

68

United States Environmental Protection Agency: Use of risk assessment and risk management methodologies. Master's thesis  

SciTech Connect (OSTI)

Make a full investigation of the policy implications and appropriate uses of risk assessment and risk management in regulatory programs under various Federal laws to prevent cancer and other chronic health effects which may result from exposure to hazardous substances. This is the primary mission of the Risk Assessment and Management Commission (Risk Commission). The Clean Air Act Amendments of 1990 (CAAA), created the Risk Commission reflecting Congress' concern over agency use of risk assessment and risk management techniques and methodologies to implement federal laws protective of human health. The Risk Commission is to consider: methods for measuring and describing risks of chronic health effects from hazardous substances; methods to reflect uncertainties associated with estimation techniques, and whether it is possible or desirable to develop a consistent risk assessment methodology or a consistent standard of acceptable risk for various federal programs.

Lamuro, R.J.

1992-09-30T23:59:59.000Z

69

Impacts of Water Loop Management on Simultaneous Heating and Cooling in Coupled Control Air Handling Units  

E-Print Network [OSTI]

The impacts of the water loop management on the heating and cooling energy consumption are investigated by using model simulation. The simulation results show that the total thermal energy consumption can be increased by 24% for a typical AHU in San...

Guan, W.; Liu, M.; Wang, J.

1998-01-01T23:59:59.000Z

70

Managing United States Public Lands in Response to Climate Change: A View From the Ground Up  

E-Print Network [OSTI]

on public lands. Though climate change is now well recognized by federal agencies and their local land Federal agencies √Ā Forestry √Ā Fuels management √Ā Decision making Introduction Increases in the atmospheric ranging from renewable energy standards to emissions trading schemes, voluntary projects set up

Neff, Jason

71

An Illustration of the Corrective Action Process, The Corrective Action Management Unit at Sandia National Laboratories/New Mexico  

SciTech Connect (OSTI)

Corrective Action Management Units (CAMUs) were established by the Environmental Protection Agency (EPA) to streamline the remediation of hazardous waste sites. Streamlining involved providing cost saving measures for the treatment, storage, and safe containment of the wastes. To expedite cleanup and remove disincentives, EPA designed 40 CFR 264 Subpart S to be flexible. At the heart of this flexibility are the provisions for CAMUs and Temporary Units (TUs). CAMUs and TUs were created to remove cleanup disincentives resulting from other Resource Conservation Recovery Act (RCRA) hazardous waste provisions--specifically, RCRA land disposal restrictions (LDRs) and minimum technology requirements (MTRs). Although LDR and MTR provisions were not intended for remediation activities, LDRs and MTRs apply to corrective actions because hazardous wastes are generated. However, management of RCRA hazardous remediation wastes in a CAMU or TU is not subject to these stringent requirements. The CAMU at Sandia National Laboratories in Albuquerque, New Mexico (SNL/NM) was proposed through an interactive process involving the regulators (EPA and the New Mexico Environment Department), DOE, SNL/NM, and stakeholders. The CAMU at SNL/NM has been accepting waste from the nearby Chemical Waste Landfill remediation since January of 1999. During this time, a number of unique techniques have been implemented to save costs, improve health and safety, and provide the best value and management practices. This presentation will take the audience through the corrective action process implemented at the CAMU facility, from the selection of the CAMU site to permitting and construction, waste management, waste treatment, and final waste placement. The presentation will highlight the key advantages that CAMUs and TUs offer in the corrective action process. These advantages include yielding a practical approach to regulatory compliance, expediting efficient remediation and site closure, and realizing potentially significant cost savings compared to off-site disposal. Specific examples of CA MU advantages realized by SNL/NM will be presented along with the above highlighted process improvements, Integrated Safety Management System (ISMS) performance, and associated lessons learned.

Irwin, M.; Kwiecinski, D.

2002-02-26T23:59:59.000Z

72

INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

Abitz, R.; Jackson, D.; Eddy-Dilek, C.

2011-06-27T23:59:59.000Z

73

DOE - Office of Legacy Management -- Dayton Project Units 3 and 4 - OH 07  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou are here Home ¬ĽHillNY 28 CornellCraneDivUnits 3

74

DOE - Office of Legacy Management -- United Nuclear Corp - MO 0-03  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site - MOTracerlab IncMinesUnited

75

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT WASTE PROCESSING ANNUAL TECHNOLOGY DEVELOPMENT REPORT 2008  

SciTech Connect (OSTI)

The Office of Waste Processing identifies and reduces engineering and technical risks and uncertainties of the waste processing programs and projects of the Department of Energy's Environmental Management (EM) mission through the timely development of solutions to technical issues. The risks, and actions taken to mitigate those risks, are determined through technology readiness assessments, program reviews, technology information exchanges, external technical reviews, technical assistance, and targeted technology development and deployment. The Office of Waste Processing works with other DOE Headquarters offices and project and field organizations to proactively evaluate technical needs, identify multi-site solutions, and improve the technology and engineering associated with project and contract management. Participants in this program are empowered with the authority, resources, and training to implement their defined priorities, roles, and responsibilities. The Office of Waste Processing Multi-Year Program Plan (MYPP) supports the goals and objectives of the U.S. Department of Energy (DOE) - Office of Environmental Management Engineering and Technology Roadmap by providing direction for technology enhancement, development, and demonstration that will lead to a reduction of technical risks and uncertainties in EM waste processing activities. The MYPP summarizes the program areas and the scope of activities within each program area proposed for the next five years to improve safety and reduce costs and environmental impacts associated with waste processing; authorized budget levels will impact how much of the scope of activities can be executed, on a year-to-year basis. Waste Processing Program activities within the Roadmap and the MYPP are described in these seven program areas: (1) Improved Waste Storage Technology; (2) Reliable and Efficient Waste Retrieval Technologies; (3) Enhanced Tank Closure Processes; (4) Next-Generation Pretreatment Solutions; (5) Enhanced Stabilization Technologies; (6) Spent Nuclear Fuel; and (7) Challenging Materials. This report provides updates on 35 technology development tasks conducted during calendar year 2008 in the Roadmap and MYPP program areas.

Bush, S.

2009-11-05T23:59:59.000Z

76

Written Statement of Mark Whitney Acting Assistant Secretary for Environmental Management United States Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment of EnergyofDepartment ofof EnergyEmbeddedGinnyManagementMark

77

Development of a Fuel Containing Material Removal and Waste Management Strategy for the Chernobyl Unit 4 Shelter  

SciTech Connect (OSTI)

A study was performed to develop a strategy for the removal of fuel-containing material (FCM) from the Chernobyl Unit 4 Shelter and for the related waste management. This study was performed during Phase 1 of the Shelter Implementation Plan (SIP) and was funded by the Chernobyl Shelter Fund. The main objective for Phase 2 of the SIP is to stabilize the Shelter and to construct a New Confinement (NC) by the year 2007. In addition, the SIP includes studies on the strategy and on the conceptual design implications of the removal of FCM from the Shelter. This is considered essential for the ultimate goal, the transformation of the Shelter into an environmentally safe system.

Tokarevsky, V. V.; Shibetsky, Y. A.; Leister, P.; Davison, W. R.; Follin, J. F.; McNair, J.; Lins, W.; Edler, G.

2002-02-27T23:59:59.000Z

78

Flood Assessment at the Area 5 Radioactive Waste Management Site and the Proposed Hazardous Waste Storage Unit, DOE/Nevada Test Site, Nye County, Nevada  

SciTech Connect (OSTI)

A flood assessment at the Radioactive Waste Management Site (RWMS) and the proposed Hazardous Waste Storage Unit (HWSU) in Area 5 of the Nevada Test Site (NTS) was performed to determine the 100-year flood hazard at these facilities. The study was conducted to determine whether the RWMS and HWSU are located within a 100-year flood hazard as defined by the Federal Emergency Management Agency, and to provide discharges for the design of flood protection.

Schmeltzer, J. S., Millier, J. J., Gustafson, D. L.

1993-01-01T23:59:59.000Z

79

Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States  

SciTech Connect (OSTI)

Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-05-16T23:59:59.000Z

80

Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States  

SciTech Connect (OSTI)

Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-07-11T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Management of Male Breast Cancer in the United States: A Surveillance, Epidemiology and End Results Analysis  

SciTech Connect (OSTI)

Purpose: To analyze the stage-specific management of male breast cancer (MBC) with surgery and radiation therapy (RT) and relate them to outcomes and to female breast cancer (FBC). Methods and Materials: The Surveillance, Epidemiology, and End Results database was queried for all primary invasive MBC and FBC diagnosed from 1973 to 2008. Analyzable data included age, race, registry, grade, stage, estrogen and progesterone receptor status, type of surgery, and use of RT. Stage was defined as localized (LocD): confined to the breast; regional (RegD): involving skin, chest wall, and/or regional lymph nodes; and distant: M1. The primary endpoint was cause-specific survival (CSS). Results: A total of 4276 cases of MBC and 718,587 cases of FBC were identified. Male breast cancer constituted 0.6% of all breast cancer. Comparing MBC with FBC, mastectomy (M) was used in 87.4% versus 38.3%, and breast-conserving surgery in 12.6% versus 52.6% (P<10{sup ?4}). For males with LocD, CSS was not significantly different for the 4.6% treated with lumpectomy/RT versus the 70% treated with M alone (hazard ratio [HR] 1.33; 95% confidence interval [CI] 0.49-3.61; P=.57). Postmastectomy RT was delivered in 33% of males with RegD and was not associated with an improvement in CSS (HR 1.11; 95% CI 0.88-1.41; P=.37). There was a significant increase in the use of postmastectomy RT in MBC over time: 24.3%, 27.2%, and 36.8% for 1973-1987, 1988-1997, and 1998-2008, respectively (P<.0001). Cause-specific survival for MBC has improved: the largest significant change was identified for men diagnosed in 1998-2008 compared with 1973-1987 (HR 0.73; 95% CI 0.60-0.88; P=.0004). Conclusions: Surgical management of MBC is dramatically different than for FBC. The majority of males with LocD receive M despite equivalent CSS with lumpectomy/RT. Postmastectomy RT is greatly underutilized in MBC with RegD, although a CSS benefit was not demonstrated. Outcomes for MBC are improving, attributable to improved therapy and its use in this unscreened population.

Fields, Emma C., E-mail: emma.fields@ucdenver.edu [Department of Radiation Oncology, University of Colorado School of Medicine, Aurora, Colorado (United States); DeWitt, Peter [Colorado Biostatistics Consortium, University of Colorado, Aurora, Colorado (United States); Fisher, Christine M.; Rabinovitch, Rachel [Department of Radiation Oncology, University of Colorado School of Medicine, Aurora, Colorado (United States)

2013-11-15T23:59:59.000Z

82

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL PROGRAM ANNUAL REPORT FOR 2007  

SciTech Connect (OSTI)

The DOE-EM Office of Engineering and Technology is responsible for implementing EM's international cooperative program. The Office of Engineering and Technology's international efforts are aimed at supporting EM's mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. The Office of Engineering and Technology has developed a Technology Roadmap and a Multi-year Program Plan to identify technology needs and identify areas for focused research and development to support DOE-EM's environmental cleanup and waste management objectives. The international cooperative program is an important element of the technology development roadmap, leveraging of world-wide expertise in the advancement and deployment of remediation and treatment technologies. Introductory briefings aimed at furthering familiarity with the DOE-EM mission, and the vital role that technology development plays within it, were presented at two international meetings. The Office of Engineering and Technology currently works with the Khlopin Radium Institute (KRI) and SIA Radon Institute in Russia, the International Radioecology Laboratory (IRL) in Ukraine and the Nuclear Engineering and Technology Institute (NETEC) in South Korea through cooperative bilateral arrangements to support EM's accelerated cleanup and closure mission.

Marra, J

2008-08-26T23:59:59.000Z

83

A successful effort to involve stakeholders in the selection of a site for a corrective action management unit  

SciTech Connect (OSTI)

As part of the effort to clean up hazardous waste sites, Sandia National Laboratories in New Mexico (SNL/NM) adopted a novel approach to involving stakeholders in a key decision associated with its Environmental Restoration (ER) Project. The decision was where to locate a Corrective Action Management Unit (CAMU), an area designed to consolidate, store, and treat wastes generated from cleanup activities. The decision-making approach was a variation of a technique known as multiattribute utility analysis (MUA). Although MUA has rarely been undertaken during normal Project activities, it proved to be a surprisingly effective means for involving stakeholders in the decision process, generating consensus over a selected site, and enhancing public trust and understanding of Project activities. Requirements and criteria for selecting CAMU sites are provided by the Environmental Protection Agency`s (EPA`s) CAMU Final Rule (EPA 1993). Recognizing the lack of experience with the Rule and the importance of community understanding and support, the ER Project sought an approach that would allow stakeholders to participate in the site-selection process.

Conway, R. [Sandia National Labs., Albuquerque, NM (United States); Merkhofer, M.W. [Applied Decision Analysis, Inc., Menlo Park, CA (United States); Oms, E. [USDOE Albuquerque, New Mexico (United State). Kirtland Area Office

1995-12-01T23:59:59.000Z

84

Testing the Cultural Boundaries of a Model of Trust: Subordinate-Manager Relationships in China, Norway and the United States  

E-Print Network [OSTI]

Key Variables for China, Norway, and United States Variablein-SupervisoróChina, Norway and US Independent VariableCommunication N China B p R Norway B p R United States B p

Whitener, Ellen M.; Maznevski, Martha L.; Hua, Wei; Saebo, Snorre R.; Ekelund, Bjorn Z.

2000-01-01T23:59:59.000Z

85

Ann Williamson, Deputy Director, Office of Environmental Assessment Mike Cox, Manager, Risk Assessment Unit, Office of Environmental Assessment  

E-Print Network [OSTI]

Ann Williamson, Deputy Director, Office of Environmental Assessment Mike Cox, Manager, Risk, WA Ann Williamson and Mike Cox, EPA Region 10 Office of Environmental Assessment, will be presenting

86

Effects of Family-Related Facotrs on Female Project Managers' Salaries in the Construction Industry in the United States  

E-Print Network [OSTI]

This study explores predictors of female project managersí salary in the construction industry and analyzes the relationship between salaries and specific variables. Although prior research indicates a relationship does exist between certain...

Bilbo, David; Bigelow, Ben F.; Rybkowski, Zofia; Kamranzadeh, Amineh

2014-07-31T23:59:59.000Z

87

Toward a greener campus : experiments with sustainable resource management at one Mexican university and two United States universities  

E-Print Network [OSTI]

Modern society faces a range of difficult resource management problem like climate change, acid rain and soil depletion. To confront problems like these successfully, educational institutions, along with all other public ...

Coffie, Randall Gregory Jesus

2005-01-01T23:59:59.000Z

88

SU-E-J-129: A Strategy to Consolidate the Image Database of a VERO Unit Into a Radiotherapy Management System  

SciTech Connect (OSTI)

Purpose: To present a strategy to integrate the imaging database of a VERO unit with a treatment management system (TMS) to improve clinical workflow and consolidate image data to facilitate clinical quality control and documentation. Methods: A VERO unit is equipped with both kV and MV imaging capabilities for IGRT treatments. It has its own imaging database behind a firewall. It has been a challenge to transfer images on this unit to a TMS in a radiation therapy clinic so that registered images can be reviewed remotely with an approval or rejection record. In this study, a software system, iPump-VERO, was developed to connect VERO and a TMS in our clinic. The patient database folder on the VERO unit was mapped to a read-only folder on a file server outside VERO firewall. The application runs on a regular computer with the read access to the patient database folder. It finds the latest registered images and fuses them in one of six predefined patterns before sends them via DICOM connection to the TMS. The residual image registration errors will be overlaid on the fused image to facilitate image review. Results: The fused images of either registered kV planar images or CBCT images are fully DICOM compatible. A sentinel module is built to sense new registered images with negligible computing resources from the VERO ExacTrac imaging computer. It takes a few seconds to fuse registered images and send them to the TMS. The whole process is automated without any human intervention. Conclusion: Transferring images in DICOM connection is the easiest way to consolidate images of various sources in your TMS. Technically the attending does not have to go to the VERO treatment console to review image registration prior delivery. It is a useful tool for a busy clinic with a VERO unit.

Yan, Y; Medin, P; Yordy, J; Zhao, B; Jiang, S [UT Southwestern Medical Center, Dallas, TX (United States)

2014-06-01T23:59:59.000Z

89

Uniting software tools for the archival, management and analysis of linguistic data: lessons from developing the Language Data Repository  

E-Print Network [OSTI]

and data management, discuss some of the current projects and tools in each of these areas, and present a summary of work currently being conducted by the Open Language Archive Community to support open web based access to the resources available...

Audenaert, Michael Neal

2013-02-22T23:59:59.000Z

90

United States Environmental Protection  

E-Print Network [OSTI]

environmental problems today and building a science knowledge base necessary to manage our ecological resources wisely, understand how pollutants affect our health, and prevent or reduce environmental risksUnited States Environmental Protection Agency Hydrogeologic Framework, Ground-Water Geochemistry

91

Development programs in the United States of America for the application of cement-based grouts in radioactive waste management  

SciTech Connect (OSTI)

This paper briefly reviews seven cement-based waste form development programs at six of the US Department of Energy (DOE) sites. These sites have developed a variety of processes that range from producing 25 mm (1 in.) diameter pellets in a glove box to producing 240 m (800 ft.) diameter grout sheets within the bedding planes of a deep shale formation. These successful applications of cement-based waste forms to the many radioactive waste streams from nuclear facilities bear witness to the flexibility and reliability of this class of materials. This paper also discusses the major issues regarding the application of cement-based waste forms to radioactive waste management problems. These issues are (1) leachability, (2) radiation stability, (3) thermal stability, (4) phase complexity of the matrix, and (5) effects of the waste stream composition. A cursory review of current research in each of these areas is given This paper also discusses future trends in cement-based waste form development and applications. 31 references, 11 figures.

Dole, L.R.; Row, T.H.

1984-01-01T23:59:59.000Z

92

Development of an integrated in-situ remediation technology. Topical report for task No. 11 entitled: Evaluation of TCE contamination before and after the field experiment, September 26, 1994--May 25, 1996  

SciTech Connect (OSTI)

Contamination in low permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. The technology is an integrated in-situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. The present Topical Report for Task No. 11 summarizes the results of TCE analysis in soil and carbon before and after conducting the field experiment. In addition, a discussion of the TCE material balance demonstrates that the Lasagna{trademark} process is effective in moving TCE from the contaminated soil into carbon treatment zones in the field experiment at DOE`s Gaseous Diffusion Plant in Paducah, Kentucky.

Hughes, B.M.; Athmer, C.J.; Sheridan, P.W. [and others

1997-04-01T23:59:59.000Z

93

An Assessment of Use, Need for, and Capacity to Integrate Climate Information Among Water Managers in Southeastern United States and the ACF Basin  

E-Print Network [OSTI]

An Assessment of Use, Need for, and Capacity to Integrate Climate Information Among Water Managers-year droughts, floods, and associated water management decisions have long concerned water managers in Western states. Similar concerns are now facing water managers in Southeastern states, including those in Georgia

Miami, University of

94

Laser Safety Management Policy Statement ............................................................................................................1  

E-Print Network [OSTI]

Laser Safety Management Policy Statement...........................................................2 Laser Users.............................................................................................................2 Unit Laser Safety Officer (ULSO

Davidson, Fordyce A.

95

Demonstration of a Novel, Integrated, Multi-Scale Procedure for High-Resolution 3D Reservoir Characterization and Improved CO2-EOR/Sequestration Management, SACROC Unit  

SciTech Connect (OSTI)

The primary goal of this project was to demonstrate a new and novel approach for high resolution, 3D reservoir characterization that can enable better management of CO{sub 2} enhanced oil recovery (EOR) projects and, looking to the future, carbon sequestration projects. The approach adopted has been the subject of previous research by the DOE and others, and relies primarily upon data-mining and advanced pattern recognition approaches. This approach honors all reservoir characterization data collected, but accepts that our understanding of how these measurements relate to the information of most interest, such as how porosity and permeability vary over a reservoir volume, is imperfect. Ideally the data needed for such an approach includes surface seismic to provide the greatest amount of data over the entire reservoir volume of interest, crosswell seismic to fill the resolution gap between surface seismic and wellbore-scale measurements, geophysical well logs to provide the vertical resolution sought, and core data to provide the tie to the information of most interest. These data are combined via a series of one or more relational models to enable, in its most successful application, the prediction of porosity and permeability on a vertical resolution similar to logs at each surface seismic trace location. In this project, the procedure was applied to the giant (and highly complex) SACROC unit of the Permian basin in West Texas, one of the world's largest CO{sub 2}-EOR projects and a potentially world-class geologic sequestration site. Due to operational scheduling considerations on the part of the operator of the field, the crosswell data was not obtained during the period of project performance (it is currently being collected however as part of another DOE project). This compromised the utility of the surface seismic data for the project due to the resolution gap between it and the geophysical well logs. An alternative approach was adopted that utilized a relational model to predict porosity and permeability profiles from well logs at each well location, and a 3D geostatistical variogram to generate the reservoir characterization over the reservoir volume of interest. A reservoir simulation model was built based upon this characterization and history-matched without making significant changes to it, thus validating the procedure. While not the same procedure as originally planned, the procedure ultimately employed proved successful and demonstrated that the general concepts proposed (i.e., data mining and advanced pattern recognition methods) have the flexibility to achieve the reservoir characterization objectives sought even with imperfect or incomplete data.

Scott R. Reeves

2007-09-30T23:59:59.000Z

96

Low-Level Radioactive Waste Management in the United States: What Have We Wrought? The Richard S. Hodes, M.D. Honor Lecture Award - 12222  

SciTech Connect (OSTI)

In 1979, radioactive waste disposal was an important national issue. State governors were closing the gates on the existing low-level radioactive waste disposal sites and the ultimate disposition of spent fuel was undecided. A few years later, the United States Congress thought they had solved both problems by passing the Low-Level Radioactive Waste Policy Act of 1981, which established a network of regional compacts for low-level radioactive waste disposal, and by passing the Nuclear Waste Policy Act of 1982 to set out how a final resting place for high-level waste would be determined. Upon passage of the acts, State, Regional and Federal officials went to work. Here we are some 30 years later with little to show for our combined effort. The envisioned national repository for high-level radioactive waste has not materialized. Efforts to develop the Yucca Mountain high-level radioactive waste disposal facility were abandoned after spending $13 billion on the failed project. Recently, the Blue Ribbon Commission on America's Nuclear Future issued its draft report that correctly concludes the existing policy toward high-level nuclear waste is 'all but completely broken down'. A couple of new low-level waste disposal facilities have opened since 1981, but neither were the result of efforts under the act. What the Act has done is interject a system of interstate compacts with a byzantine interstate import and export system to complicate the handling of low-level radioactive waste, with attendant costs. As this paper is being written in the fourth-quarter of 2011, after 30 years of political and bureaucratic turmoil, a new comprehensive low-level waste disposal facility at Andrews Texas is approaching its initial operating date. The Yucca Mountain project might be completed or it might not. The US Nuclear Regulatory Commission is commencing a review of their 1981 volume reduction policy statement. The Department of Energy after 26 years has yet to figure out how to implement its obligations under the 1985 amendments to the Low-Level Radioactive Waste Policy Act. But, the last three decades have not been a total loss. A great deal has been learned about radioactive waste disposal since 1979 and the efforts of the public and private sector have shaped and focused the work to be done in the future. So, this lecturer asks the question: 'What have we wrought?' to which he provides his perspective and his recommendations for radioactive waste management policy for the next 30 years. (author)

Jacobi, Lawrence R.

2012-07-01T23:59:59.000Z

97

Wildlife Management Area  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

facilities at the Metals Reduction Plant 2010 Completed demolition of the East End Smelter 2010 Began operation of the C-400 TCE Source Removal System 2010 Completed removal of...

98

ORISE: Emergency Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

provided direction and experienced leadership to the Federal Bureau of Investigation's (FBI) Crisis Management Unit to establish a standardized exercise program for the FBI that...

99

United States Department of  

E-Print Network [OSTI]

play an important role in a national program for reducing greenhouse gas emissions. The conversion potential through conversion of nonforest land to forest land and through the management of forest lands and sinks in the United States can be identified. International treaties on greenhouse gas reduction require

100

United States Department of  

E-Print Network [OSTI]

United States Department of Agriculture Managing Habitats for White-tailed DeerForest Service Rocky Mountain Forest and Range Experiment Station Fort Collins, Colorado 80526 General Technical Report RM-GTR-274 Black Hills and Bear Lodge Mountains of South Dakota and Wyoming Carolyn Hull Sieg and Kieth E

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

United States of Agriculture  

E-Print Network [OSTI]

in wildlife management from the University of New Hampshire in 1988. She joined the Intermountain Research Station in 1993 after working for the States of New Hampshire and Wyoming on projects involving wetlandUnited States Department of Agriculture Forest Service Intermountain Research Station General

102

United States Department of  

E-Print Network [OSTI]

are thought to contribute to carbon sequestration, including current debates on this topic. The science regarding forestry and carbon sequestration is more advanced and less controversial than that for range, land management, carbon sequestration, carbon markets, United States. #12;ii Executive Summary

103

OFFICE OF RESOURCE PLANNING OPERATING BUDGET UNIT  

E-Print Network [OSTI]

OFFICE OF RESOURCE PLANNING Manager Sarah Teo OPERATING BUDGET UNIT Deputy Director (Operating, Strategic Initiatives & Consolidated Budgets) Tay Sok Kian Senior Director Ajith Prasad Senior Associate Initiatives & Research Budgets: (Planning & Budget Management) Revenue Policies & Planning: (Grants

Leng, Chenlei

104

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

193 UNIT NUMBER: 197 UNIT NAME: CONCRETE RUBBLE PILE (30) REGULATORY STATUS: AOC LOCATION: Outside plant security fence, north of the plant on Big Bayou Creek on private property....

105

Demonstration and analysis of tangible heritage management strategy using geographical information systems for the city of Al-Ain, United Arab Emirates  

E-Print Network [OSTI]

. But the second direction is lacking good strategic efforts for conservation, preservation methods and tourism promotion, especially among different authorities that are in charge of either management or implementation of conservation techniques. Therefore...

Al Zaabi, Azza Hasan

2006-10-30T23:59:59.000Z

106

United Nations on Trade and  

E-Print Network [OSTI]

by the World Summit on Sustainable Development in September 2002, the United Nations Forum on Forests on the Management, Conservation and Sustainable Development of All Types of Forests, and the relevant Chapters on the Management, Conservation and Sustainable Development of All Types of Forests; (e) Recognizing the importance

107

Comparative Water Law and Management: The Yellow River Basin In Western China and the State of Kansas In the Western United States  

E-Print Network [OSTI]

of these canal systems ranges between 0.38 to 0.45 and 0.35 to 0.51, respectively. 42 In other words, between 50-60% of Yellow River water is lost TRANSFER MANAGEMENT SYSTEM CONSTRUCTION 32-38 (Yellow River Conservancy Press 2008) (P.R.C.) [hereinafter YRCC...-supply problems in the Basin and in Kansas. Part III surveys their respective water laws and water management and allocation programs, with particular attention to water rights transfers, to show how the Chinese and Kansas systems have sought to address...

Griggs, Burke W.; Peck, John C.; Yupeng, Xue

2009-01-01T23:59:59.000Z

108

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 UNIT NAME C-611 Underaround Diesel Tank REGULATORY STATUS: AOC LOCATION: Immediately southeast of C-611 APPROXIMATE DIMENSIONS: 1000 gallon FUNCTION: Diesel storage OPERATIONAL...

109

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

In place DATES OPERATED: Unknown SITEPROCESS DESCRIPTION: Ballard Wildlife Management Area utilizes concrete rubble for dam and road stabilization. This concrete rubble...

110

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 UNIT NAME C-632-8 Sulfuric Acid Storaqe TaD REGULATORY STATUS CERCLA LOCATION Southwest of C-631 coolin location 76 APPROXIMATE DIMENSIONS 5000 Qal - FUNCTION Sulfuric acid...

111

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 C-750B Diesel UST UNIT NAME REGULATORY STATUS: AOC LOCATION: Southeast corner of C-750 APPROXIMATE DIMENSIONS: 10,000 gallon FUNCTION: Diesel storage OPERATIONAL STATUS: Removed...

112

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 UNIT NAME C-633 PCB So111 Site REGULATORY STATUS CERCLA LOCATION C-633 Transformer area (Mac location 75) APPROXIMATE DIMENSIONS I Unknown FUNCTION Soill site OPERATIONAL STATUS...

113

Evict on write, a management strategy for a prefetch unit and/or first level cache in a multiprocessor system with speculative execution  

DOE Patents [OSTI]

In a multiprocessor system with at least two levels of cache, a speculative thread may run on a core processor in parallel with other threads. When the thread seeks to do a write to main memory, this access is to be written through the first level cache to the second level cache. After the write though, the corresponding line is deleted from the first level cache and/or prefetch unit, so that any further accesses to the same location in main memory have to be retrieved from the second level cache. The second level cache keeps track of multiple versions of data, where more than one speculative thread is running in parallel, while the first level cache does not have any of the versions during speculation. A switch allows choosing between modes of operation of a speculation blind first level cache.

Gara, Alan; Ohmacht, Martin

2014-09-16T23:59:59.000Z

114

Energy Management Issued: June 2010  

E-Print Network [OSTI]

Energy Management Policy Issued: June 2010 Revised: Responsible Administrative Unit: Finance.0 BACKGROUND AND PURPOSE The Engineering and Energy Management division of the Department of Facilities Management at the Colorado School of Mines ("Mines" or "the school") has developed an Energy Management

115

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

116

assessment united states: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the department has engaged in four major curriculum Liberzon, Daniel 144 Municipal Solid Waste in The United States Environmental Management and Restoration Websites Summary:...

117

Capacity planning and admission control policies for intensive care units  

E-Print Network [OSTI]

Poor management of the patient flow in intensive care units (ICUs) causes service rejections and presents significant challenges from the standpoint of capacity planning and management in ICUs. This thesis reports on the ...

Chaiwanon, Wongsakorn

2010-01-01T23:59:59.000Z

118

United States  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage ¬Ľof EnergyTheTwo New EnergyofDEVELOPMENTEnergy 1n n d d eAlan8 United

119

United States Nuclear Waste Technical Review Board  

E-Print Network [OSTI]

United States Nuclear Waste Technical Review Board Experience Gained From Programs to Manage High-Level Radioactive Waste and Spent Nuclear Fuel in the United States and Other Countries A Report to Congress and the Secretary of Energy April 2011 #12;#12;U.S. Nuclear Waste Technical Review Board Experience Gained From

120

Development of an integrated, in-situ remediation technology. Draft topical report for task No. 9. Part II. Entitled: TCE degradation using non-biological methods, September 26, 1994--May 25, 1996  

SciTech Connect (OSTI)

Contamination in low permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. The technology is an integrated in-situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. The use of zero valence iron for reductive dechlorination of aliphatic chlorinated hydrocarbons is currently under investigation by a number of research groups as a potential method of in-situ treatment of contaminated ground water. The reaction appears to involve the transfer of electrons to chloro-aliphatic compounds by the oxidation of zero valence iron to ferrous iron (Fe{sup +2}). Our studies have indicated that this reaction is consistent with those of corrosion, and as such, can be influenced or increased by the presence of small amounts of metals (5% by weight) such as copper, tin, silver, gold and palladium coated on the iron surface. Incomplete coverage of the iron surface with a more electropositive metal results in an open galvanic cell, which increases the oxidation of iron and facilitates and increases the concurrent reduction of trichloroethylene and other chlorinated aliphatic compounds to the corresponding alkenes and alkanes. Our results show that plating more electropositive metals onto certain iron surfaces results in approximately a factor of ten increase in the dechlorination rate of small organochlorine compounds such as TCE.

Orth, R.G.; McKenzie, D.E.

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

122

Termination unit  

SciTech Connect (OSTI)

This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

Traeholt, Chresten [Frederiksberg, DK; Willen, Dag [Klagshamn, SE; Roden, Mark [Newnan, GA; Tolbert, Jerry C [Carrollton, GA; Lindsay, David [Carrollton, GA; Fisher, Paul W [Heiskell, TN; Nielsen, Carsten Thidemann [Jaegerspris, DK

2014-01-07T23:59:59.000Z

123

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Computers and Other Electronics in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings...

124

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Air Conditioning in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total...

125

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Water Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total...

126

Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers  

E-Print Network [OSTI]

actions, develop an energy management plan for business; and38. Caffal, C. (1995). Energy Management in Industry. Centre2005a). Guidelines for Energy Management. United States

Worrell, Ernst

2008-01-01T23:59:59.000Z

127

Better Buildings Alliance, Advanced Rooftop Unit Campaign: Rooftop Unit Measurement and Verification (Fact Sheet)  

SciTech Connect (OSTI)

This document provides facility managers and building owners an introduction to measurement and verification (M&V) methods to estimate energy and cost savings of rooftop units replacement or retrofit projects to estimate paybacks or to justify future projects.

Not Available

2014-09-01T23:59:59.000Z

128

Hospitality Management Hospitality Management  

E-Print Network [OSTI]

of the global hospitality industry. Academic Offerings HOSPITALITY AND FOOD SERVICE MANAGEMENT MINOR HOSPITALITY AND FOOD SERVICE MANAGEMENT MINOR Students pursuing programs in other areas of study may choose a minor Lodging Management 3 HPM 309 Sports Arena Management 3 HPM 312* Cost Control in Food Services (Prereq

McConnell, Terry

129

Dechlorination of TCE with palladized iron  

DOE Patents [OSTI]

The present invention relates to various methods, such as an above-ground method and an in-ground method, of using a palladized iron bimetallic system for the dechlorination of chlorinated organic compounds from various effluents or contaminated soil containing the same. The use of palladized iron bimetallic system results in the dechlorination of the chlorinated organic compound into environmentally safe reaction products. 10 figs.

Fernando, Q.; Muftikian, R.; Korte, N.

1997-04-01T23:59:59.000Z

130

Dechlorination of TCE with palladized iron  

DOE Patents [OSTI]

The present invention relates to various methods, such as an above-ground method and an in-ground method, of using a palladized iron bimetallic system for the dechlorination of chlorinated organic compounds from various effluents or contaminated soil containing the same. The use of palladized iron bimetallic system results in the dechlorination of the chlorinated organic compound into environmentally safe reaction products.

Fernando, Quintus (Tucson, AZ); Muftikian, Rosy (Tucson, AZ); Korte, Nic (Grand Junction, CO)

1997-01-01T23:59:59.000Z

131

TCE Energy Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump to: navigation,Open EnergyFacility | OpenEVEnergyETCE Energy

132

Report to the Environmental Management Advisory Board  

Office of Environmental Management (EM)

the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted by the Risk Communications Subcommittee Date - June 14, 2013...

133

1. MATHEMATICS and SCIENCE (36 units minimum)1 Including Math 19, 20, 21 (or 41 & 42)  

E-Print Network [OSTI]

fundamentals elective, 3-5 units1 Required Depth ­ 38 units CEE 100 Managing Sustainable Building Projects, 4 Issues in Engineering, 4 units SUSTAINABILITY CEE 176A Energy Efficient Buildings, 3-4 units CEE 115 Goals and Methods for Sustainable Design of Buildings, 3-4 units ME 222 Beyond Green Theory: Workshop

Prinz, Friedrich B.

134

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Computers and Other Electronics in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in...

135

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Not Asked (Apartments in Buildings" "With 5 or More Units)",19.1,4.4,3.7,6.2,4.7 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

136

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Not Asked (Apartments in Buildings" "With 5 or More Units)",19.1,9.6,5,2.2,1.5,0.8 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

137

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Air Conditioning in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With"...

138

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

2 Water Heating in U.S. Homes, by OwnerRenter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With"...

139

United States Department of  

E-Print Network [OSTI]

Gifford Pinchot Drive Madison, WI #12;2 International system of units (SI conversion factors) Conversion English unit factor SI unit acre 4,046 square meter (m2 ) board foot 0.002 cubic meter (m3 ) bushel (U

140

Network Management Network Management  

E-Print Network [OSTI]

that pertain to the operation, administration, maintenance, and provisioning of networked systems ∑ Operation deals with keeping the network up (and the service provided by the network) ∑ Administration involvesNetwork Management Pag. 1 Network Management Andrea Bianco Telecommunication Network Group Network

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Energy Management Curriculum Starter Kit  

SciTech Connect (OSTI)

The Energy Management Curriculum Starter Kit was designed to help engineering educators develop and teach energy management courses. Montana State University and Oklahoma State University courses are embodied in the model curriculum given. The curricula offered at many other universities throughout the United States are also presented. The kit was designed specifically to train engineering students to be good energy managers. Courses at both the undergraduate and postgraduate level are presented.

Turner, W.C.

1987-02-01T23:59:59.000Z

142

Mobile inspection and repackaging unit  

SciTech Connect (OSTI)

Storage of large volumes of radioactive mixed waste (RMW) generated over the past 20 years at the Hanford Site has resulted in various waste management challenges. Presently, disposal capacity for RMW does not exist. Containers holding RMW will be stored until processing facilities can be completed to provide treatment and final disposal. Because of the complexity of these wastes, special projects have been initiated to properly manage them. This paper addresses one such project. The goal of this project is to develop a mobile inspection and repackaging unit (IRU) for solid RMW. The paper describes the structural design, equipment, ventilation system, instruments and electrical systems, video monitors and recorders, materials handling, and waste processing of containers.

Whitney, G.A.; Roberts, R.J. [Westinghouse Hanford Co., Richland, WA (United States). Solid Waste Disposal Div.

1993-12-31T23:59:59.000Z

143

FIELD SCREENING FOR HALOGENATED VOLATILE ORGANIC COMPOUNDS: THE NEW X-WAND HVOC SCREENING DEVICE  

SciTech Connect (OSTI)

Western Research Institute (WRI) has developed new methodology and a test kit to screen soil or water samples for halogenated volatile organic compounds (HVOCs) in the field. The technology has been designated the X-Wand{trademark} screening tool. The new device uses a heated diode sensor that is commonly used to detect leaks of refrigerants from air conditioners, freezers, and refrigerators. This sensor is selective to halogens. It does not respond to volatile aromatic hydrocarbons, such as those in gasoline, and it is not affected by high humidity. In the current work, the heated diode leak detectors were modified further to provide units with rapid response and enhanced sensitivity. The limit of detection for trichloroethylene TCE in air is 0.1 mg/m{sup 3} (S/N = 2). The response to other HVOCS relative to TCE is similar. Variability between sensors and changes in a particular sensor over time can be compensated for by normalizing sensor readings to a maximum sensor reading at 1,000 mg/m{sup 3} TCE. The soil TCE screening method was expanded to include application to water samples. Assuming complete vaporization, the detection limit for TCE in soil is about 1 ug/kg (ppb) for a 25-g sample in an 8-oz jar. The detection limit for TCE in water is about 1 ug/L (ppb) for a 25-mL sample in an 8-oz jar. This is comparable to quantitation limits of EPA GC/MS laboratory methods. A draft ASTM method for screening TCE contaminated soils using a heated diode sensor was successfully submitted for concurrent main committee and subcommittee balloting in ASTM Committee D 34 on Waste Management. The method was approved as ASTM D 7203-05, Standard Test Method for Screening Trichloroethylene (TCE)-Contaminated Soil Using a Heated Diode Sensor.

John F. Schabron; Susan S. Sorini; Joseph F. Rovani Jr

2006-03-01T23:59:59.000Z

144

Conservation of Lynx in the United States  

E-Print Network [OSTI]

455 Chapter 17 Conservation of Lynx in the United States: A Systematic Approach to Closing Critical. To avoid haphazard research and to maximize the benefits to lynx conservation with limited research funds on lynx in the U.S. to be a significant impediment to science-based conservation and management. New

145

UNITED STATES CODE TITLE 15 CHAPTER 82 -  

E-Print Network [OSTI]

the Earth's natural resources, in carrying out national security functions, and in planning and conducting. The national interest of the United States lies in maintaining international leadership in satellite land for national security purposes and global environmental change research, management responsibilities

146

Large-Scale Wind Integration Studies in the United States: Preliminary Results; Preprint  

SciTech Connect (OSTI)

The National Renewable Energy Laboratory is managing two large regional wind integration studies on behalf of the United States Department of Energy. These two studies are believed to be the largest ever undertaken in the United States.

Milligan, M.; Lew, D.; Corbus, D.; Piwko, R.; Miller, N.; Clark, K.; Jordan, G.; Freeman, L.; Zavadil, B.; Schuerger, M.

2009-09-01T23:59:59.000Z

147

Memorandum of Understanding among the United States Department...  

Broader source: Energy.gov (indexed) [DOE]

Between the United States Department of Energy and the Washington State Department of Ecology for Development of the Hanford Site Tank Closure and Waste Management EIS ("TC&WM...

148

Vehicle Fleet Policy Responsible Administrative Unit: Finance & Administration  

E-Print Network [OSTI]

Vehicle Fleet Policy Responsible Administrative Unit: Finance & Administration Policy Contact, and established campus vehicle fleet service under Facilities Management operations. The purpose of the fleet vehicles. This policy is applicable to the entire Mines fleet, which includes department vehicles. 2

149

Community-based Natural Resource Management  

E-Print Network [OSTI]

with respect to access, use or management of a resource (e.g. grass, water, trees, wildlife) #12;Right to sellCommunity-based Natural Resource Management: State of the Science--Global Perspectives María E stocking rates to within carrying capacity) Management Obtain resource units (e.g. hunt wildlife, graze

150

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Televisions" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Televisions" "Number of...

151

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" "Fuels Used and End Uses",,"Own","Rent","Own","Rent",...

152

200-BP-5 operable unit treatability test report  

SciTech Connect (OSTI)

The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

NONE

1996-04-01T23:59:59.000Z

153

Unit Testing Discussion C  

E-Print Network [OSTI]

Unit Testing Discussion C #12;Unit Test public Method is smallest unit of code Input/output transformation Test if the method does what it claims Not exactly black box testing #12;Test if (actual result Expected Computed Input #12;Functionality Computation ­ Easy to test Time based Asynchronous interaction

Massachusetts at Amherst, University of

154

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,4.4,1,0.5,0.5,3.4,2.4,0.6,0.5 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

155

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"With 5 or More Units)",19.1,2.3,16.8,"N","N","N","N","N","N",2.3,16.8,"N","N" "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

156

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,2,0.7,1.3,2.6,4.1,3.5,2.5,2.4 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

157

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"With 5 or More Units)",19.1,6.2,3.5,0.5,0.5,1.1,0.6,"Q",0.7,0.4,0.2,2,1.4,0.6 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

158

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Buildings" "With 5 or More Units)",19.1,4.7,0.9,0.4,0.3,"Q",0.6,0.4,"Q",3.8,2.9,0.9 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

159

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,3.7,2.7,0.9,0.6,0.3,0.9,1,0.2,0.6,0.2 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

160

School of Forest Resources and Conservation 2009 Unit Review Document  

E-Print Network [OSTI]

School of Forest Resources and Conservation UF/IFAS 2009 Unit Review Document October, 2009; Revised January, 2010 #12;School of Forest Resources and Conservation UF/IFAS 2009 Unit Review Document that encompass sustainable conservation, production and management. Mission To deliver integrated programs

Watson, Craig A.

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

United States of Agriculture  

E-Print Network [OSTI]

. We also provide an overview of how management practices can influence carbon sequestration desertification is projected to increase in the future, management strategies that increase carbon sequestration Rangelands February 2014. Keywords: Global climate change; carbon dioxide (CO2 ); carbon sequestration

162

EOC Title: Documentation Unit General Description The Documentation Unit maintains accurate, up-to-date incident files  

E-Print Network [OSTI]

PLANNING EOC Title: Documentation Unit General Description The Documentation Unit maintains, EOC Action Plan, and other documents, as required ∑ Ensure an EOC sign-in sheet is available for each and Initial Action Incidents (3 hours) ∑ IS-700 National Incident Management System (3 hours) ∑ IS-800

Walker, Matthew P.

163

An interim report to the manager of the Paducah Gaseous Diffusion Plant from the Paducah Environmental Advisory Committee  

SciTech Connect (OSTI)

The Paducah Environmental Advisory Committee was formed as: (1) an outgrowth of other Environmental Advisory Committees already in existence at Oak Ridge and other Martin Marietta Energy Systems plants; (2) a result of public concern following significant nuclear incidents at Bhopal and Chernobyl; (3) a result of the new direction and commitment of the management of the Paducah Gaseous Diffusion Plant following contract acquisition by Martin Marietta Energy Systems; and (4) a means of reducing and/or preventing local and/or public concern regarding the activities of and potential risks created by PGDP. This report discusses the following issues and concerns of the Committee arrived at through a series of meetings: (1) groundwater monitoring; (2) long-range tails storage; C-404, scrap yrads, and PCB and TCE cleanup; nuclear criticality plan and alarm systems; documentation of historical data regarding hazardous waste burial grounds; dosimeter badges; and asbestos handling and removal.

Jackson, G.D.

1987-10-01T23:59:59.000Z

164

SUBCONTRACT MANAGEMENT  

Energy Savers [EERE]

0-1 CHAPTER 10 SUBCONTRACT MANAGEMENT (Revised October 19, 2011) WHAT ARE THE BASIC PRINCIPLES AND OBJECTIVES OF SUBCONTRACT MANAGEMENT? 1. To ensure contractors establish,...

165

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Fuels Used and End Uses in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

166

United States Department of  

E-Print Network [OSTI]

., Ashland, OR 97520 and Gwyneth Myer, Consultant, 220 W. Rapp Rd. Unit 3, Talent, OR 97540. #12;2 THE FIRE

167

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Computers and Other Electronics in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census...

168

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Computers and Other Electronics in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census...

169

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Computers and Other Electronics in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

170

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Computers and Other Electronics in Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census...

171

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

1 Air Conditioning in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific Census...

172

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Air Conditioning in Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census Division",,,"Middle...

173

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Air Conditioning in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East...

174

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

9 Air Conditioning in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

175

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

9 Water Heating in U.S. Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census...

176

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Water Heating in U.S. Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East...

177

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

11 Water Heating in U.S. Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,"Pacific...

178

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Water Heating in U.S. Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census...

179

Conference Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities with respect to managing conferences sponsored by the Department of Energy (DOE) or by DOE management and operating contractors and other contractors who perform work at DOE-owned or -leased facilities, including management and integration contractors and environmental restoration management contractors (when using funds that will be reimbursed by DOE). Cancels DOE N 110.3.

1999-11-03T23:59:59.000Z

180

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full. Also, an associative list processing unit and method comprising employing a plurality of prioritized cell blocks and using a tree of prioritized multiplexers descending from the plurality of cell blocks.

Hemmert, Karl Scott; Underwood, Keith D.

2013-01-29T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

United States Environmental  

E-Print Network [OSTI]

Protect Your Family From Lead in Your Home United States Environmental Protection Agency United · What you can do to protect your family · Where to go for more information Before renting or buying Family from Lead Hazards If you think your home has lead-based paint: · Don't try to remove lead

Loudon, Catherine

182

United States Department of  

E-Print Network [OSTI]

Assessment Thomas M. Quigley, Editor U.S. Department of Agriculture Forest Service Pacific Northwest Research, and Andy Wilson. Thomas M. Quigley Editor United States Department of Agriculture Forest Service United Service, Pacific Northwest Research Station. 120 p. (Quigley, Thomas M., ed.; Interior Columbia Basin

Brown, Gregory G.

183

Improving Unit Operations-Test Station Performance  

E-Print Network [OSTI]

IMPROVING UNIT OPERATIONS - TEST STATION PERFORMANCE JosqIb 1. Filak. Jr, ? Corporate Energy Manager. Park.er?Hannafin COfpontioo- Cleveland. Oh ABSTRACT: This program's basic concept deals with the possibilities for reducing energy efficiency... requirements, control operation test performance functions more successfully, and retain peak load surges from reaching higher utility rate expense levels. 142 ESL-IE-95-04-23 Proceedings from the Seventeenth Industrial Energy Technology Conference...

Filak, J. J. Jr.

184

United States Department of  

E-Print Network [OSTI]

programs for entering local weather data. Retrieval Terms: Douglas-fir, seed orchard, pest management, pest, for his encouragement, David L. Rowney for his programming assistance, and William A. Copper for preparing. The computer program described provides a Douglas-fir seed orchard manager (user) with a quantitative method

Standiford, Richard B.

185

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Televisions in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

186

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

" Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry" "Fuels Used and End Uses",,"Cold",,"Hot-Dry","Hot-Humid...

187

" Million Housing Units, Preliminary"  

U.S. Energy Information Administration (EIA) Indexed Site

Computers and Other Electronics in U.S. Homes, By Number of Household Members, 2009" " Million Housing Units, Preliminary" ,,"Number of Household Members" ,"Total U.S.1 (millions)"...

188

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Computers and Other Electronics in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before...

189

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Computers and Other Electronics in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South"...

190

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

5 Computers and Other Electronics in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty...

191

Voltage verification unit  

DOE Patents [OSTI]

A voltage verification unit and method for determining the absence of potentially dangerous potentials within a power supply enclosure without Mode 2 work is disclosed. With this device and method, a qualified worker, following a relatively simple protocol that involves a function test (hot, cold, hot) of the voltage verification unit before Lock Out/Tag Out and, and once the Lock Out/Tag Out is completed, testing or "trying" by simply reading a display on the voltage verification unit can be accomplished without exposure of the operator to the interior of the voltage supply enclosure. According to a preferred embodiment, the voltage verification unit includes test leads to allow diagnostics with other meters, without the necessity of accessing potentially dangerous bus bars or the like.

Martin, Edward J. (Virginia Beach, VA)

2008-01-15T23:59:59.000Z

192

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

4 Air Conditioning in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More...

193

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air Conditioning in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Air...

194

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Air Conditioning in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

195

" Million Housing Units, Final"  

U.S. Energy Information Administration (EIA) Indexed Site

5 Air Conditioning in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less...

196

Associative list processing unit  

DOE Patents [OSTI]

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full.

Hemmert, Karl Scott; Underwood, Keith D

2014-04-01T23:59:59.000Z

197

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Appliances in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950...

198

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Televisions in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950...

199

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Household Demographics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

200

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Water Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than...

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Water Heating in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to...

202

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Water Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

203

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

7 Water Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Water...

204

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

4 Water Heating in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More...

205

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than 20,000","20,000 to 39,999","40,000 to 59,999","60,000 to...

206

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

by the U.S. Department of Energy's Office of Energy and Efficiency and Renewable Energy (EERE). 3Housing units are classified as urban or rural using definitions created...

207

Name:______________________________________ _ Unit:___________________________________ Address:_ ___________________________________________________________________________  

E-Print Network [OSTI]

Poultry Name:______________________________________ _ Unit_Project_Began:_ __________________________ _ Ended:_________________________________ (Check All That Apply) Type of Project: Type of Poultry Raised: _____ Raising and Rearing Poultry _____ Commercial Egg Chickens _____ Poultry and Egg Consumer Projects

Liskiewicz, Maciej

208

Project Management Plan Resident Management System (RMS)  

E-Print Network [OSTI]

1 Project Management Plan Resident Management System (RMS) And Quality Control System (QCS Resident Management System.........................................................................................................3 Project Management Plan - Purpose

US Army Corps of Engineers

209

SUPPLY CHAIN MANAGEMENT Evren Sahin  

E-Print Network [OSTI]

with the productive unit of an organization and its interface with the other functional areas such as Finance.e., internal to the company and external to consumers), and flexibility (i.e., volume, product, process.sahin@ecp.fr MOTIVATION The Management function of Manufacturing, Operations or Production, refer to the same discipline

Paragios, Nikos

210

ICDF Complex Operations Waste Management Plan  

SciTech Connect (OSTI)

This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

W.M. Heileson

2006-12-01T23:59:59.000Z

211

Best Buys and Unit Pricing  

E-Print Network [OSTI]

This guide explains how to determine a unit price--the cost of an item based on a specific unit such as pound or ounce. Unit pricing can be used to identify foods that are the most economical....

Anding, Jenna

2000-02-02T23:59:59.000Z

212

United States Domestic Research Reactor Infrastrucutre TRIGA Reactor Fuel Support  

SciTech Connect (OSTI)

The United State Domestic Research Reactor Infrastructure Program at the Idaho National Laboratory manages and provides project management, technical, quality engineering, quality inspection and nuclear material support for the United States Department of Energy sponsored University Reactor Fuels Program. This program provides fresh, unirradiated nuclear fuel to Domestic University Research Reactor Facilities and is responsible for the return of the DOE-owned, irradiated nuclear fuel over the life of the program. This presentation will introduce the program management team, the universities supported by the program, the status of the program and focus on the return process of irradiated nuclear fuel for long term storage at DOE managed receipt facilities. It will include lessons learned from research reactor facilities that have successfully shipped spent fuel elements to DOE receipt facilities.

Douglas Morrell

2011-03-01T23:59:59.000Z

213

Solving Unit Commitment by a Unit Decommitment Method  

E-Print Network [OSTI]

Solving Unit Commitment by a Unit Decommitment Method Chung-Li Tsengy,Chao-an Liz, Shmuel S. Oren x October 14, 1997 Abstract In this paper, we present an e cient and robust method for solving unit commit- ment problem using a unit decommitment method. 1 Introduction A problem that must be frequently solved

214

UNITED STATES OF AMERICA  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date:CharterDepartmentDOE LM issued theUNITED STATES UNITED

215

LRRB Pavement Management Systems Pavement Management Systems  

E-Print Network [OSTI]

LRRB Pavement Management Systems Pavement Management Systems Presented by: Michael Marti SRF for implementing and monitoring research results (RIC) #12;LRRB Pavement Management Systems LRRB Structure LRRB Current Pavement Management System Used ICON (Goodpointe) Year of Pavement Management System

Minnesota, University of

216

Unit hydrograph application to stormwater collection system design and analysis  

E-Print Network [OSTI]

review of each model studied and its capabilities follows. Storm Water Management Model. ? The Storm Water Management Model (SWMM) was developed by the United States Environmental Protection Agency for the analysis of urban stormwater runoff... backwater analysis option uses the Direct Step Method to compute the water surface profiles in the storm sewer system. Two case studies with complex stormwater collection systems were modeled to verify and validate the hydrologic and hydraulic methods...

Spinks, Melvin Gerald

1987-01-01T23:59:59.000Z

217

BNL-100708-2013 Cultural Resource Management Plan  

E-Print Network [OSTI]

BNL-100708-2013 Cultural Resource Management Plan for Brookhaven National Laboratory May 2013 of this manuscript, or allow others to do so, for United States Government purposes. #12;Cultural Resource Management Cultural Resources CRC Cultural Resources Coordinator CRM Cultural Resource Management CRMP Cultural

218

Position Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order prescribes the policies, responsibilities, and procedures for position management within (DOE). Canceled by DOE N 1321.140. Cancels DOE 3510.1

1992-06-23T23:59:59.000Z

219

Water Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Water Management This department applies multi-disciplinary science and technology-based modeling to assess complex environmental systems. It integrates ecology, anthropology, and...

220

Program Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will participate in a wide spectrum of program and project management activities involving systems engineering and integration support for Defense Programs...

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

MANAGEMENT (MNG)  

Broader source: Energy.gov (indexed) [DOE]

and recommendations is adequately implemented. (DOE Order 414.1A, Criterion 3; 10 CFR 830, Subpart A) Approach Record Review * Review the SWS issues management systems and...

222

Quality Management  

Broader source: Energy.gov [DOE]

The Office of Quality Management, within the Office of Health, Safety and Security develops policies and procedures to ensure the classification and control of information is effective and...

223

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

lectricity",38.1,5.6,13.6,4.1,12.4,2.5 "Central Warm-Air Furnace",19.1,1.8,6.5,2.2,8,0.6 "Heat Pump",9.8,0.8,4.7,0.9,3,0.4 "Built-In Electric Units",5.7,2.4,1.6,0.3,0.2,1.2...

224

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electricity",38.1,20,2.1,3.3,8.9,3.9 "Central Warm-Air Furnace",19.1,9.6,1,1.5,4.9,2 "Heat Pump",9.8,7,0.7,0.2,0.9,0.9 "Built-In Electric Units",5.7,1.9,0.3,1.1,2.3,"Q"...

225

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

"Electricity",38.1,2.4,4.6,24.2,7 "Central Warm-Air Furnace",19.1,0.3,2.3,13.7,2.9 "Heat Pump",9.8,0.4,0.6,7.5,1.3 "Built-In Electric Units",5.7,1.4,1.4,1.2,1.7 "Portable...

226

United States Department of  

E-Print Network [OSTI]

Hills National Forest uses such a habitat capability model (HABCAP), but its accuracy is largely unknown, Wildlife Biologist with Black Hills National Forest, Custer, SD 2 South Dakota State UniversityUnited States Department of Agriculture Forest Service Rocky Mountain Forest and Range Experiment

227

United States Department of  

E-Print Network [OSTI]

: For additional copies: U.S. FOREST SERVICE U.S. Forest Service 11 CAMPUS BLVD SUITE 200 Publications Distribution Forest, New Hampshire, began in 1932. One of the studies, still maintained today, consisted of severalUnited States Department of Agriculture Forest Service Northern Research Station Research Paper NRS

228

United States Department of  

E-Print Network [OSTI]

Station at Durham, New Hampshire. The computer program described in this publication was created usingUnited States Department of Agriculture Forest Service Northern Research Station General Technical://www.nrs.fs.fed.us/ Published by: For additional copies: U.S. FOREST SERVICE U.S. Forest Service 11 CAMPUS BLVD SUITE 200

229

United States Department of  

E-Print Network [OSTI]

copies: USDA FOREST SERVICE USDA Forest Service 11 CAMPUS BLVD SUITE 200 Publications Distribution at Durham, New Hampshire; JENNIFER C. JENKINS, jjenkins@fs.fed.us, is a research foresterUnited States Department of Agriculture Forest Service Northeastern Research Station General

230

United Nations Development Programme  

E-Print Network [OSTI]

Energy Concessions: Pilot Programs 7.5. Modernising Corn Stover Use in Rural Jilin Province, China 7United Nations Development Programme Bureau for Development Policy Energy and Atmosphere Programme. #12;5 Acknowledgements 6 Notes on Authors 7 Foreword 9 Executive Summary 27 Introduction: Energy

231

FISHERY STATISTICS UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1973 STATISTICAL DIGEST NO. 67 Prepared by STATISTICS a review of the fishery statistics for the year 1973 . These statistics include data on the volume and value of landings of fishery products, employment 1n the fish- eries, quantity of gear operated, number

232

FISHERY STATISTICS UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1971 STATISTICAL DIGEST NO. 65 Prepared by STATISTICS ry statistics for the year 1971 . These statistics include data on the volume and value of landings of fishery products, employment in the fishe ries, quantity of gear operated, number of fishing craft e

233

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air Conditioning Usage Indicators by Type of Housing Unit, 2005" " Million U.S. Housing Units" ,,"Type of Housing Unit" ,"Housing Units (millions)","Single-Family...

234

United States Department of  

E-Print Network [OSTI]

activities in rural areas can result in sudden and severe changes in every facet of community life, or power, water, and sewage districts become either heavily overloaded or overbuilt. Public leaders find changes in leader- ship. Federal land managers find themselves caught up in con- troversy and facing

Standiford, Richard B.

235

United States Environmental Protection  

E-Print Network [OSTI]

federal and state agencies to prepare for emergencies at U.S. nuclear plants, transportation accidents is actively involved with other U.S. government agencies for preparing to respond to acts of chemical, EPAprovides support to the Emergency ManagementAgency by: (1) establishing guidelines for protecting

236

United States Department of  

E-Print Network [OSTI]

Lisle R. Green Leonard A. Newell #12;The Authors: LISLE R. GREEN is a range scientist with the Station.S. Department of Agriculture, San Diego, California, and program manager of the Forest's Laguna;Using Goats to Control Brush Regrowth on Lisle R.Green. Leonard A. Newell CONTENTS Introduction

Standiford, Richard B.

237

United States Department of  

E-Print Network [OSTI]

programs.) Persons with disabilities who require alternative means for communication of program information and public property. Nationally, a successful program was characterized as one with sufficient resources to the principle of multiple use management of the Nation's forest resources for sustained yields of wood, water

Standiford, Richard B.

238

United States Department of  

E-Print Network [OSTI]

is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons property. Nationally, a successful program was characterized as one with sufficient resources of multiple use management of the Nation's forest resources for sustained yields of wood, water, forage

Standiford, Richard B.

239

Parameter Unit Name Unit Symbol Capacitance (C) Farad F  

E-Print Network [OSTI]

Management LANL Los Alamos National Laboratory LOTO Lockout/Tagout NEC National Electrical Code NEMA National

240

BachelorofManagement InternationalManagement  

E-Print Network [OSTI]

on the official transcript (see Part 11 - Faculty of Management in the 2007/2008 Calendar). Program Planning Guide Management 3050/Political Science 3420 - Human Resource Management Management 3061 - Information Systems Environment Management 3640 - Cross-Cultural Management Practices Management 3660/Geography 3225 - Industrial

Seldin, Jonathan P.

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Contamination analysis unit  

DOE Patents [OSTI]

The portable Contamination Analysis Unit (CAU) measures trace quantifies of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surface by measuring residual hazardous surface contamination, such as tritium and trace organics It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings.

Gregg, Hugh R. (Livermore, CA); Meltzer, Michael P. (Livermore, CA)

1996-01-01T23:59:59.000Z

242

Contamination analysis unit  

DOE Patents [OSTI]

The portable Contamination Analysis Unit (CAU) measures trace quantities of surface contamination in real time. The detector head of the portable contamination analysis unit has an opening with an O-ring seal, one or more vacuum valves and a small mass spectrometer. With the valve closed, the mass spectrometer is evacuated with one or more pumps. The O-ring seal is placed against a surface to be tested and the vacuum valve is opened. Data is collected from the mass spectrometer and a portable computer provides contamination analysis. The CAU can be used to decontaminate and decommission hazardous and radioactive surfaces by measuring residual hazardous surface contamination, such as tritium and trace organics. It provides surface contamination data for research and development applications as well as real-time process control feedback for industrial cleaning operations and can be used to determine the readiness of a surface to accept bonding or coatings. 1 fig.

Gregg, H.R.; Meltzer, M.P.

1996-05-28T23:59:59.000Z

243

Thermal insulated glazing unit  

SciTech Connect (OSTI)

An improved insulated glazing unit is provided which can attain about R5 to about R10 thermal performance at the center of the glass while having dimensions about the same as those of a conventional double glazed insulated glazing unit. An outer glazing and inner glazing are sealed to a spacer to form a gas impermeable space. One or more rigid, non-structural glazings are attached to the inside of the spacer to divide the space between the inner and outer glazings to provide insulating gaps between glazings of from about 0.20 inches to about 0.40 inches. One or more glazing surfaces facing each thermal gap are coated with a low emissivity coating. Finally, the thermal gaps are filled with a low conductance gas such as krypton gas.

Selkowitz, Stephen E. (Piedmont, CA); Arasteh, Dariush K. (Oakland, CA); Hartmann, John L. (Seattle, WA)

1991-01-01T23:59:59.000Z

244

Thermal insulated glazing unit  

SciTech Connect (OSTI)

An improved insulated glazing unit is provided which can attain about R5 to about R10 thermal performance at the center of the glass while having dimensions about the same as those of a conventional double glazed insulated glazing unit. An outer glazing and inner glazing are sealed to a spacer to form a gas impermeable space. One or more rigid, non-structural glazings are attached to the inside of the spacer to divide the space between the inner and outer glazings to provide insulating gaps between glazings of from about 0.20 inches to about 0.40 inches. One or more glazing surfaces facing each thermal gap are coated with a low emissivity coating. Finally, the thermal gaps are filled with a low conductance gas such as krypton gas. 2 figs.

Selkowitz, S.E.; Arasteh, D.K.; Hartmann, J.L.

1988-04-05T23:59:59.000Z

245

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

.1,0.9,2.6,3.8,7,7.8,7.1,6.8 "Central Warm-Air Furnace",19.1,0.6,0.3,1,1.6,3.5,4,3.8,4.3 "Heat Pump",9.8,0.4,0.2,0.5,0.7,1.6,2,2.2,2.2 "Built-In Electric Units",5.7,0.7,0.2,0.5,0.9...

246

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

.2,7.1,4.4,2.6,1.3,3,6.8 "Central Warm-Air Furnace",19.1,4.6,5.5,3.6,2.2,1.2,0.6,1.4,3.5 "Heat Pump",9.8,1.4,2,2,1.4,1,0.6,1.3,0.9 "Built-In Electric Units",5.7,1.9,1.6,0.9,0.6,0.3...

247

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

.4,0.4,0.3,0.2,2,0.5,1.3,0.1 "Central Warm-Air Furnace",19.1,0.3,0,0,"Q",0.2,0.1,"Q","Q" "Heat Pump",9.8,0.4,"Q","Q","N",0.4,"Q",0.4,"N" "Built-In Electric Units",5.7,1.4,0.3,0.2,0...

248

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

ctricity",38.1,11.7,11.7,5.9,5.1,3.8 "Central Warm-Air Furnace",19.1,5.6,5.5,3.2,2.7,2.2 "Heat Pump",9.8,2.5,3.7,1.6,1.3,0.7 "Built-In Electric Units",5.7,2.4,1.7,0.6,0.7,0.4...

249

Trading zones : cooperating for water resource and ecosystem management when stakeholders have apparently irreconcilable differences .  

E-Print Network [OSTI]

??Disputes over the management of water resources in the United States often seem irreconcilable because stakeholders' differences in values, beliefs, and identities are so hardÖ (more)

Fuller, Boyd

2006-01-01T23:59:59.000Z

250

Feasibility of rainwater harvesting for urban water management in Salt Lake City.  

E-Print Network [OSTI]

??Water managers in the western United States are being challenged by rapid urban growth and limited water availability. The development of new water resources isÖ (more)

Jensen, Mark A

2008-01-01T23:59:59.000Z

251

DOE/LX/07-0178&D1 Secondary Document DMSA OS-13 Solid Waste Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8&D1 Secondary Document DMSA OS-13 Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 224 DATE OF ORIGINAL SAR: 120100 DATE OF SAR REVISIONS: 031509...

252

DOE/LX/07-0170&D1 Secondary Document DMSA OS-02 Solid Waste Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0&D1 Secondary Document DMSA OS-02 Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 213 DATE OF ORIGINAL SAR: 120100 DATE OF SAR REVISIONS: 031509...

253

DOE/LX/07-0175&D1 Secondary Document DMSA OS-10 Solid Waste Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5&D1 Secondary Document DMSA OS-10 Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 221 DATE OF ORIGINAL SAR: 120100 DATE OF SAR REVISIONS: 031509...

254

Chairs and Directors of Academic Units Academic Management Main Office  

E-Print Network [OSTI]

, and Planning) Mira Sucharov 3741Assistant Dean (Student Success) Keir Armstrong 3744Chair, Department of International Affairs Christopher Waddell 7404Director, School of Journalism and Communication Susan Phillips

Dawson, Jeff W.

255

Ms Sylvia Stephen, MSc. Human Nutrition Unit Manager  

E-Print Network [OSTI]

us: The Rowett Institute of Nutrition and Health offers a bespoke service to the food industry We us for further information www.abdn.ac.uk/rowett FOOD LABELLING Helping you get it right Why you need are making a Nutritional Claim With the introduction of EU regulation 1169/2011, food manufacturers

Levi, Ran

256

Integrating Process Unit Energy Metrics into Plant Energy Management Systems  

E-Print Network [OSTI]

As energy costs continue to rise across the process industry, many plants have responded by developing improved energy monitoring and reporting programs. At the center of such programs are typically spreadsheet or database applications that pull...

Davis, J. L.; Knight, N.

2005-01-01T23:59:59.000Z

257

DOE - Office of Legacy Management -- Dayton Project Unit 6 - Scioto  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou are here Home ¬ĽHillNY 28 CornellCraneDiv

258

DOE - Office of Legacy Management -- Separations Process Research Unit -  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou are herePAOsborneSavannah River Swamp - SC024

259

DOE - Office of Legacy Management -- United Lead Co - NJ 29  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site - MOTracerlab IncMines

260

Risk Management Procedures Category: Strategic Management  

E-Print Network [OSTI]

/POLICY SUPPORTED Risk Management Policy Tertiary Education Quality Standards Agency Act 2011 (TEQSA Act 2011) 21 Risk Management Procedures Category: Strategic Management 1. LEGISLATION/ENTERPRISE AGREEMENT. PROCEDURAL DETAILS 2.1. Responsibilities Entity / Officer Responsibilities Planning and Management Committee

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Conference Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes requirements and responsibilities for managing conferences sponsored or co-sponsored by the Department of Energy, including the National Nuclear Security Administration. Cancels DOE O 110.3. Canceled by DOE N 251.97.

2007-01-25T23:59:59.000Z

262

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

263

Stormwater Management  

E-Print Network [OSTI]

management program must be developed that would meet the standard of reducing pollutants to the maximum extent practicable. Stormwater management programs for medium and large MS4s include measures to: ? Identify major outfalls and pollutant loadings... seeding: The vegetation used will be part of final landscaping, but during construction it prevents soil erosion. ? Mulching: Materials such as hay, grass, woodchips, gravel, or straw are placed on top of the soil to keep it from eroding. Structural...

Jaber, Fouad

2008-10-23T23:59:59.000Z

264

Technology & Information Management B.S. Degree Curriculum Chart: 2013-2014  

E-Print Network [OSTI]

Technology & Information Management B.S. Degree Curriculum Chart: 2013-2014 http Analysis & Design * TIM 105 Management of Technology I * TIM 125 Management of Technology II #* TIM 158 Business Strategy & Information Systems TIM 101 Management of Technology Seminar (2 units) * MATH 19B

Stuart, Josh

265

Technology & Information Management B.S. Degree Curriculum Chart: 2014-2015  

E-Print Network [OSTI]

Technology & Information Management B.S. Degree Curriculum Chart: 2014-2015 http Analysis & Design * TIM 105 Management of Technology I * TIM 125 Management of Technology II #* TIM 158 Business Strategy & Information Systems TIM 101 Management of Technology Seminar (2 units) * MATH 19B

Stuart, Josh

266

United States Government  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C.Green River,TheEPAJ60014-90101681278 United

267

Summary Max Total Units  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage ¬Ľof Energy Strain Rate4 Recovery Act/BuySummary Max Total Units *If All

268

UNITED STATES OF AMERICA  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date:CharterDepartmentDOE LM issued theUNITED STATES

269

l UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCTTO:March_ ,' .' ft. n.-_ ._UNITED

270

UNITED STATES OF AMERICA  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage ¬Ľof EnergyTheTwo New Energyof Energy8, UNITED STATES DEPARTMENT

271

FISHERY STATISTICS E UNITED STATES  

E-Print Network [OSTI]

SH 11 .A443X FISH FISHERY STATISTICS E UNITED STATES ^ 1951 &ch 3. \\§^ ^/'· m:^ STATISTICAL DIGEST. Farley, Director Statistical Digest 30 FISHERY STATISTICS OF THE UNITED STATES 1951 BY A. W. ANDERSON;Fishery Statistics of the United States and Alaska are compiled and published annually to make available

272

Avoidable waste management costs  

SciTech Connect (OSTI)

This report describes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management cost data for routine operations at Department of Energy (DOE) facilities. Waste volumes from environmental restoration, facility stabilization activities, and legacy waste were specifically excluded from this effort. A core team consisting of Idaho National Engineering Laboratory, Los Alamos National Laboratory, Rocky Flats Environmental Technology Site, and Oak Ridge Reservation developed and piloted the methodology, which can be used to determine avoidable waste management costs. The method developed to gather information was based on activity based costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progression of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, which detailed the scope of the activity. Labor and material costs based on a unit quantity of waste being processed were then summed to generate a total cost for that flow diagram. Cross-complex values were calculated by determining a weighted average for each waste type or treatability group based on the volume generated. This study will provide DOE and contractors with a better understanding of waste management processes and their associated costs. Other potential benefits include providing cost data for sites to perform consistent cost/benefit analysis of waste minimization and pollution prevention (WMIN/PP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited resources for WMIN/PP.

Hsu, K.; Burns, M.; Priebe, S.; Robinson, P.

1995-01-01T23:59:59.000Z

273

Environmental management activities  

SciTech Connect (OSTI)

The Office of Environmental Management (EM) has been delegated the responsibility for the Department of Energy`s (DOE`s) cleanup of the nuclear weapons complex. The nature and magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. Within the United States, operational DOE facilities, as well as the decontamination and decommissioning of inactive facilities, have produced significant amounts of radioactive, hazardous, and mixed wastes. In order to ensure worker safety and the protection of the public, DOE must: (1) assess, remediate, and monitor sites and facilities; (2) store, treat, and dispose of wastes from past and current operations; and (3) develop and implement innovative technologies for environmental restoration and waste management. The EM directive necessitates looking beyond domestic capabilities to technological solutions found outside US borders. Following the collapse of the Soviet regime, formerly restricted elite Soviet scientific expertise became available to the West. EM has established a cooperative technology development program with Russian scientific institutes that meets domestic cleanup objectives by: (1) identifying and accessing Russian EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) increasing US private sector opportunities in Russian in EM-related areas.

NONE

1997-07-01T23:59:59.000Z

274

Managing the Management: CORBAbased Instrumentation of Management Systems  

E-Print Network [OSTI]

Managing the Management: CORBA­based Instrumentation of Management Systems A. Keller Munich Network to dynamically exchange customer­ and technology­related data. In this context, management systems are crucial providers: On the one hand, different service providers have chosen different management systems

275

Business Management Analyst Business Manager Director of Communication Contracts Manager  

E-Print Network [OSTI]

· Business Management Analyst · Business Manager · Director of Communication · Contracts Manager of Sales · President/Owner · Instructor of Business · Senior Buyer · North American Sales Manager · Talent graduation. You will have the skills & knowledge to manage and grow a successful business. You will be able

Maxwell, Bruce D.

276

Environmental restoration and remediation technical data management plan  

SciTech Connect (OSTI)

The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

Key, K.T.; Fox, R.D.

1994-02-01T23:59:59.000Z

278

Inventory of power plants in the United States, 1993  

SciTech Connect (OSTI)

The Inventory of Power Plants in the United States is prepared annually by the Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), U.S. Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). The publication also provides a 10-year outlook of future generating unit additions. Data summarized in this report are useful to a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

Not Available

1994-12-01T23:59:59.000Z

279

Superfund Record of Decision (EPA Region 8): Ogden Defense Depot, Operable Unit 1, Weber County, UT. (Second remedial action), June 1992  

SciTech Connect (OSTI)

Since 1941, the 1,100-acre Ogden Defense Depot (DDOU) site, located in Ogden, Weber County, Utah, has been a key installation in the Department of Defense supply system. Operable Unit 1, which is located in the southwest part of the DDOU, is composed of the backfill material in the Plain City Canal, Burial Site 1, and Burial Site 3-B. Burial Site 1 was reported to have been used for the disposal of riot control agent (chloroacetophenone) and white smoke (hexachloroethane) containers in the 1940's. In the early 1960's, Burial Site 3-B was reportedly the burying ground for over 1,000 arctic-style rubber boots. The ROD addresses a final remedy for OU1 that will reduce the principal threats posed by contaminated soil and shallow ground water at the site. The primary contaminants of concern affecting the soil, debris, and ground water are VOCs, including TCE; other organics, including dioxins and pesticides; and metals, including arsenic and lead.

Not Available

1992-06-26T23:59:59.000Z

280

Spatial Analysis of Contaminants in 200 West Area Groundwater in Support of the 200-ZP-1 Operable Unit Pre-Conceptual Remedy Design  

SciTech Connect (OSTI)

This report documents a preliminary spatial and geostatistical analysis of the distribution of several contaminants of interest (COIs) in groundwater within the unconfined aquifer beneath the 200 West Area of the Hanford Site. The contaminant plumes of interest extend within the 200-ZP-1 and 200-UP-1 groundwater operable units. The COIs included in the PNNL study were carbon tetrachloride (CTET), technetium-99 (Tc-99), iodine-129 (I-129), chloroform, plutonium, uranium, trichloroethylene (TCE), and nitrate. The project included three tasks. Task 1 involved the development of a database that includes all relevant depth-discrete data on the distribution of COIs in the study area. The second task involved a spatial analysis of the three-dimensional (3D) distribution of data for the COIs in the study area. The main focus of the task was to determine if sufficient data are available for geostatistical mapping of the COIs in 3D. Task 3 involved the generation of numerical grids of the concentration of CTET, chloroform, and Tc-99.

Murray, Christopher J.; Bott, Yi-Ju

2008-12-30T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

The Department of Homeland Security Energy Management Program  

Energy Savers [EERE]

Security Energy Management Program May 2, 2007 DHS Energy Program Overview Steven W. White, CEM May 2, 2007 2 Policy "It is the policy of the United States that Federal agencies...

282

U.S. electric utility demand-side management 1993  

SciTech Connect (OSTI)

This report presents comprehensive information on electric power industry demand-side management activities in the United States at the national, regional, and utility levels. Data is included for energy savings, peakload reductions, and costs.

NONE

1995-07-01T23:59:59.000Z

283

Portfolio management in the Air Force : current status and opportunities  

E-Print Network [OSTI]

There are hundreds of weapons programs, under the management of the United States Air Force worth billions of dollars. These programs are being developed to fulfill a need in the U.S. defense strategy. Bringing these weapon ...

Morgan, Dave B

2011-01-01T23:59:59.000Z

284

2013 Reporting Unit Codes | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2013 Reporting Unit Codes 2013 Reporting Unit Codes CFC Reporting Unit Codes 2013.pdf More Documents & Publications EA-0372: Final Environmental Assessment Alignment: Achieving...

285

Managing Solutions  

E-Print Network [OSTI]

tx H2O | pg. 19 Texas Water Resources Institute (TWRI) project managers work together with scientists and educators as well as government funding agencies to address water quality and quantity issues in Texas. Each of TWRI?s five project... the funds.? Gregory began his role at TWRI in 2006 upon com- pletion of a master?s degree in water management and hydrological science at Texas A&M University. A former Mills Scholar, Gregory was familiar with TWRI. He saw that the institute...

Baker, Emily

2007-01-01T23:59:59.000Z

286

Environmental management of water projects  

SciTech Connect (OSTI)

This book is divided in three parts and contains the following: PART I: ENVIRONMENTAL ASSESSMENTS. Environmental conditions for water resource projects. Characteristics of some large scale reservoirs. Biological parameters of the TVA Eurasian watermilfoil management program. Ecological parameters influencing aquatic plant growth. Biological parameters influencing growth and reproduction of hydrilla. PART II: EVALUATION OF SELECTED AQUATIC HERBICIDES. Technical review of the factors affecting 2,4-D for aquatic use. Technical review of the factors affecting endothall for aquatic use. Technical review of factors affecting diquat for aquatic use. Technical review of the factors affecting use of dicamba. Technical review of the factors affecting aquatic use of dichlobenil. PART III: EVALUATION OF VEGETATION MANAGEMENT PROGRAMS. Strategies for aquatic vegetation management. (A) conversion of factors for U.S. and metric units. (B) Glossary of terms. Index.

Gangstad, E.O.; Stanley, R.A.

1987-01-01T23:59:59.000Z

287

Inventory of Power Plants in the United States, October 1992  

SciTech Connect (OSTI)

The Inventory of Power Plants in the United States is prepared annually by the Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), US Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). The publication also provides a 10-year outlook of future generating unit additions. Data summarized in this report are useful to a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The report is organized into the following chapters: Year in Review, Operable Electric Generating Units, and Projected Electric Generating Unit Additions. Statistics presented in these chapters reflect the status of electric generating units as of December 31, 1992.

Not Available

1993-10-27T23:59:59.000Z

288

UNIT NUMBER SWMU 175 UNIT NAME: Concrete Rubble Pile (28...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

75 UNIT NAME: Concrete Rubble Pile (28) REGULATORY STATUS: AOC LOCATION: Outside Security Fence, East of C-360 Building in KPDES Outfall Ditch 002. APPROXIMATE DIMENSIONS: 400 ft...

289

Superfund Record of Decision (EPA Region 1): Nyanza Chemical Waste Dump, Operable Unit 2, Ashland, MA. (Second remedial action), September 1991  

SciTech Connect (OSTI)

The 35-acre Nyanza Chemical site is a former dye manufacturing facility in Ashland, Middlesex County, Massachusetts. Land adjacent to the site is used for industrial, residential, commercial, and recreational purposes. The site overlies an unconsolidated glacial aquifer, which has been affected by site activities. Wastes included process wastewater, chemical sludge, solid process wastes in drums, solvent recovery distillation residue in drums, off-specification products, and un-recyclable process chemicals including phenol, nitrobenzene, and mercuric sulfate. The dye waste stream and wastewater were discharged to an onsite concrete 'vault' or settling basin adjacent to the main processing building. The ROD addresses management of migration as OU2, and constitutes an interim remedy designed to treat the highest ground water contamination and to collect additional data achieving cleanup objectives. A subsequent ROD will address uncontrolled wastewater discharges to the Sudbury River and its tributaries. The primary contaminants of concern affecting the ground water are VOCs including benzene, PCE, TCE, and toluene; other organics; and metals including arsenic, chromium, and lead. The selected interim remedial action for the site is included.

Not Available

1991-09-23T23:59:59.000Z

290

Object Management Systems  

E-Print Network [OSTI]

Object-Oriented Database Management Systems for EngineeringR. Cassel. Distribution Management Systems: Functions and8-PWR 1988. Network Management Systems 52 Subodh Bapat.

Gollu, Aleks Ohannes

1995-01-01T23:59:59.000Z

291

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 ē Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

292

Environmental Management System Plan  

E-Print Network [OSTI]

Management Program, R-3 ē Environmental Management SystemEnvironmental policy 3. Environmental aspects 4. Legal andObjectives, targets, and Environmental Management Programs

Fox, Robert

2009-01-01T23:59:59.000Z

293

MUSHROOM WASTE MANAGEMENT PROJECT LIQUID WASTE MANAGEMENT  

E-Print Network [OSTI]

of solid and liquid wastes generated at mushroom producing facilities. Environmental guidelines#12;MUSHROOM WASTE MANAGEMENT PROJECT LIQUID WASTE MANAGEMENT PHASE I: AUDIT OF CURRENT PRACTICE The Mushroom Waste Management Project (MWMP) was initiated by Environment Canada, the BC Ministry

294

Waste Management Program management plan. Revision 1  

SciTech Connect (OSTI)

As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

NONE

1997-02-01T23:59:59.000Z

295

MATERIALS MANAGEMENT MATERIALS MANAGEMENT -INVENTORY CONTROL  

E-Print Network [OSTI]

MATERIALS MANAGEMENT MATERIALS MANAGEMENT - INVENTORY CONTROL Record of Property Transferred from ______ ___________________________________ 2. DEAN (If Applies) ______ ___________________________________ 5. UNIVERSITY DIRECTOR OF MATERIALS MANAGEMENT ______ ___________________________________ 3. HOSPITAL DIRECTOR (If Applies) ______ IF YOU NEED

Oliver, Douglas L.

296

Managing Critical Management Improvement Initiatives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Provides requirements and responsibilities for planning, executing and assessing critical management improvement initiatives within DOE. DOE N 251.59, dated 9/27/2004, extends this Notice until 10/01/2005. Archived 11-8-10. Does not cancel other directives.

2003-10-01T23:59:59.000Z

297

China Energy Databook -- User Guide and Documentation, Version 7.0  

E-Print Network [OSTI]

GDP Unit Year Total Energy Consumption (tce/thousand yuan)Textile printing, total energy consumption Viscose fiber (refining (cane), total energy consumption Sugar refining (

Fridley, Ed., David

2008-01-01T23:59:59.000Z

298

Management of the Department of Energy Nuclear Weapons Complex  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines and affirms the authorities and responsibilities of the National Nuclear Security Administration (NNSA) for the management of the Department of Energy Nuclear Weapons Complex and emphasizes that the management of the United States nuclear weapons stockpile is the DOE's highest priority for the NNSA and the DOE Nuclear Weapons Complex. Cancels DOE O 5600.1.

2005-06-08T23:59:59.000Z

299

Faculty of MANAGEMENT Alberta Oil & Gas Company1  

E-Print Network [OSTI]

Faculty of MANAGEMENT Alberta Oil & Gas Company1 Daphne Jackson, operations manager for Alberta Oil "unitize") which will then be operated by a single organization, maximizing oil production while reducing expense and environmental impacts. Oilfield exploration and development An underground deposit of oil

Nakayama, Marvin K.

300

Best Management Practice #1: Water Management Planning  

Broader source: Energy.gov [DOE]

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Environmental Management Waste Management Facility (EMWMF) at...  

Office of Environmental Management (EM)

Technical Review Report: Oak Ridge Reservation Review of the Environmental Management Waste Management Facility (EMWMF) at Oak Ridge By Craig H. Benson, PhD, PE; William H....

302

Office of Facilities Management Macquarie University  

E-Print Network [OSTI]

Office of Facilities Management ­ Macquarie University: Air Conditioning General Policy No Division, Department, Office or other occupant of University facilities will act in respect of air-conditioning systems of units by or through external sources. Air-conditioning requirements for all capital works projects

Wang, Yan

303

ROBERT BROWN DEPUTY MANAGER, OAK RIDGE OFFICE  

E-Print Network [OSTI]

ROBERT BROWN DEPUTY MANAGER, OAK RIDGE OFFICE AUGUST 24, 2010 OVERVIEW OF THE UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OFFICE #12;( 2 ) KEY OAK RIDGE MISSIONS Oak Ridge Office · Science CONTRACTORS Oak Ridge National Laboratory Oak Ridge Institute for Science and Education Office of Scientific

304

UNIVERSITY OF SASKATCHEWAN FACILITIES MANAGEMENT DIVISION  

E-Print Network [OSTI]

UNIVERSITY OF SASKATCHEWAN FACILITIES MANAGEMENT DIVISION POLICY Policy Number: 310.1 Approvals at the University of Saskatchewan. In addition, it will provide other administrative and academic units at the University of Saskatchewan with a model for sustainability in their respective workplaces. Policy Statement

Peak, Derek

305

Enrollment Management Annual Report 2011-2012  

E-Print Network [OSTI]

PurduePlan powered by Degree Works in January 2013. · Additional Six Sigma process improvement projects around the EM different EM units through Six Sigma-Green Belt training in the summer of 2012. Six Sigma is a business of transfer calls. 4 EMAR 2012 This Year in Enrollment Management Six Sigma group creates data with trebuchets

Fern√°ndez-Juricic, Esteban

306

Environmental Management  

SciTech Connect (OSTI)

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

None

2014-11-12T23:59:59.000Z

307

Environmental Management  

ScienceCinema (OSTI)

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

None

2015-01-07T23:59:59.000Z

308

Contract Management Certificate Program  

E-Print Network [OSTI]

Contract Management Certificate Program Accelerate Your Career BusinessandManagement extension bearing the UC seal signifies a well- known, uncompromising standard of academic excellence. #12;Contract Management Certificate Program UC Irvine Extension's Contract Management Certificate Program focuses on core

Rose, Michael R.

309

Energy, Data Management, Reporting  

Broader source: Energy.gov (indexed) [DOE]

About Schneider Electric Enterprise wide Data Management Outputs Foundation and results Part of a complete energy management solution Schneider Electric...

310

1254 IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, VOL. 52, NO. 5, SEPTEMBER 2003 Effect of Personal Mobility Management in  

E-Print Network [OSTI]

Mobility Management in Mobile Communication Networks Yun Won Chung, Member, IEEE, Min Young Chung, i.e., the ratio of cost per unit time for supporting both terminal mobility (TM) and PM management in the implementation of PM management in IMT-2000. Index Terms--Mobility management, personal mobility, uni- versal

Sung, Dan Keun

311

SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT  

SciTech Connect (OSTI)

This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

Kupar, J; Sadika Baladi, S; Mark Amidon, M

2007-05-22T23:59:59.000Z

312

E-Print Network 3.0 - air toxic regulations Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AQPM air quality program manager ARP accidental release prevention ATCM air toxic control... -volatile organic compound TAC toxic air contaminant TCA trichloroethane TCE...

313

Advanced Unit Commitment Strategies in the United States Eastern Interconnection  

SciTech Connect (OSTI)

This project sought to evaluate the impacts of high wind penetrations on the U.S. Eastern Interconnection and analyze how different unit commitment strategies may affect these impacts.

Meibom, P.; Larsen, H. V.; Barth, R.; Brand, H.; Tuohy, A.; Ela, E.

2011-08-01T23:59:59.000Z

314

A Duration Analysis of Food Safety Recall Events in the United States: January, 2000 to October, 2009  

E-Print Network [OSTI]

issued by firms over the period of January, 2000 through October, 2009 in the United States. Utilizing economic and management theory to establish predictions, this study employs the Cox proportional hazard regression model to analyze the effects of firm...

Joy, Nathaniel Allen

2012-02-14T23:59:59.000Z

315

Landscape Management Systems The Visual Management System  

E-Print Network [OSTI]

Landscape Management Systems The Visual Management System of the Forest Service, USDA1 Warren R presentation on how the Visual Management System (VMS) functions. 1/ Presented at the National Conference Manual 2380, Landscape Management, USDA. INTRODUCTION The American people are concerned about the quality

Standiford, Richard B.

316

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement Controls over

317

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement Controls overOverview -

318

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement Controls overOverview

319

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement Controls

320

Management Overview  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement ControlsVHTR Materials

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DEACTIVATION MANAGEMENT  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2Consolidated Edison5 by ISA -ofDATA REPORT ON7 DATE:AFPsMANAGEMENT The

322

Management Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -Lowellfor 2013Malcolm J.Management Alert:Used

323

Management Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -Lowellfor 2013Malcolm J.Management

324

NIF Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Regionat Cornell Batteries & FuelTechnologies |T I OPSNIF Management

325

Bibliographic Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I.Program InformationBibliographic Managment

326

Dynamics of Transboundary Ground Water Management: Lessons from1 North America2  

E-Print Network [OSTI]

-Society-Science in Transition. Water Resources Development and8 Management Series, Berlin: Springer-Verlag, pp. 167-196]9 101 Dynamics of Transboundary Ground Water Management: Lessons from1 North America2 Michael E Abstract11 Transboundary ground water management in the North American countries of Canada, the United

Kurapov, Alexander

327

Rangeland Ecology & Management Spatially-explicit representation of state-and-transition models  

E-Print Network [OSTI]

Rangeland Ecology & Management Spatially-explicit representation of state-and-transition models state-and-transition models (STMs) to spatial units is a valuable management tool for structuring ground Manager¬ģ from Aries Systems Corporation #12;1 Spatially-Explicit Representation of State-and-Transition

328

Second United Nations International Conference  

Office of Scientific and Technical Information (OSTI)

Second United Nations International Conference on the Peaceful Uses of Atomic Energy ON THE ANALYSIS O F BUBBLE CHAMBER TRACKS Q Hugh Bradner and F r a n k Solmitz INTRODUCTION A j...

329

United Tribes Tribal Leaders Summit  

Broader source: Energy.gov [DOE]

The United Tribes Technical College is hosting its 16th Annual Tribal Leaders Summit in Bismarck, North Dakota. This yearís theme is ďEducation Leading the Way to a Sustainable Tribal DevelopmentĒ...

330

Reduction in Unit Steam Production  

E-Print Network [OSTI]

In 2001 the company's Arch-Brandenburg facility faced increased steam costs due to high natural gas prices and decreased production due to shutdown of a process. The facility was challenged to reduce unit steam consumption to minimize the effects...

Gombos, R.

2004-01-01T23:59:59.000Z

331

PLANNING UNIT October 26, 2009  

E-Print Network [OSTI]

PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

Prasad, Sanjiva

332

Managing nuclear predominant generating capacity  

SciTech Connect (OSTI)

The most common belief, associated with nuclear power plant, leads to the conclusion that it can only operate, as a base load plant. This observation can be reversed, by just looking at large generating capacity, using an important nuclear generation mix. Nuclear plants may certainly load follow and contribute to the grid frequency control. The French example illustrates these possibilities. The reactor control of French units has been customized to accommodate the grid requests. Managing such a large nuclear plant fleet requires various actions be taken, ranging from a daily to a multi-annual perspective. The paper describes the various contributions leading to safe, reliable, well accepted and cost competitive nuclear plants in France. The combination of all aspects related to operations, maintenance scheduling, nuclear safety management, are presented. The use of PWR units carries considerable weight in economic terms, with several hundred million francs tied in with outage scheduling every year. This necessitates a global view of the entire generating system which can be mobilized to meet demand. There is considerable interaction between units as, on the one hand, they are competing to satisfy the same need, and, on the other hand, reducing maintenance costs means sharing the necessary resources, and thus a coordinated staggering of outages. In addition, nuclear fuel is an energy reserve which remains in the reactor for 3 or 4 years, with some of the fuel renewed each year. Due to the memory effect, the fuel retains a memory of past use, so that today's choices impact upon the future. A medium-term view of fuel management is also necessary.

Bouget, Y.H.; Herbin, H.C.; Carbonnier, D.

1998-07-01T23:59:59.000Z

333

2 A New Map of Global Ecological Land Units --An Ecophysiographic Stratification Approach A Special Publication of the Association of American Geographers 3 A New Map of Global Ecological Land Units --  

E-Print Network [OSTI]

disasters, 3) manage water, biological, energy, and mineral resources, and 4) enhance and protect our#12;2 A New Map of Global Ecological Land Units -- An Ecophysiographic Stratification Approach A Special Publication of the Association of American Geographers 3 A New Map of Global Ecological Land Units

Fleskes, Joe

334

DOE Jobs Online (Hiring Manager), Office of Human Capitol Management...  

Energy Savers [EERE]

Jobs Online (Hiring Manager), Office of Human Capitol Management Innovation and Solutions DOE Jobs Online (Hiring Manager), Office of Human Capitol Management Innovation and...

335

Offshore Aquaculture in the United States  

E-Print Network [OSTI]

Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities). 2008. Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities;Offshore Aquaculture in the United States: Economic Considerations, Implications & Opportunities Prepared

336

Saskatchewan Instructional Development and Research Unit (SIDRU)  

E-Print Network [OSTI]

Saskatchewan Instructional Development and Research Unit (SIDRU) 25th ANNUAL REPORT 2009 2010 Saskatchewan Instructional Development & Research Unit Faculty of Education: SIDRU@uregina.ca #12; CONTENTS SASKATCHEWAN INSTRUCTIONAL DEVELOPMENT & RESEARCH UNIT

Argerami, Martin

337

CANADA RUSSIA UNITED KINGDOM UNITED STATES Building / Launching / Operating first ever high definition,  

E-Print Network [OSTI]

1 CANADA · RUSSIA · UNITED KINGDOM · UNITED STATES 1 #12;2 Building / Launching / Operating first

338

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air-Conditioning Usage Indicators by Year of Construction, 2005" " Million U.S. Housing Units" ,,"Year of Construction" ,"Housing Units (millions)" ,,"Before 1940","1940 to...

339

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

7 Air-Conditioning Usage Indicators by Number of Household Members, 2005" " Million U.S. Housing Units" ,,"Number of Households With --" ,"Housing Units (millions)" ,,"1 Member","2...

340

-UNIT NAME C-728 Motor Cleaning Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

UNIT NUMBER 33 -UNIT NAME C-728 Motor Cleaning Facility -REGULATORY STATUS--3:.:::.0:..04(--u) -LOCATION North of C-720 (Map...

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Million U.S. Housing Units Total...............................  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

Units (millions) Single-Family Units Apartments in Buildings With-- Home Electronics Usage Indicators Detached Energy Information Administration: 2005 Residential Energy...

342

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

0 Home Appliances Usage Indicators by Year of Construction, 2005" " Million U.S. Housing Units" ,,"Year of Construction" ,"Housing Units (millions)" ,,"Before 1940","1940 to...

343

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

5 Space Heating Usage Indicators by Year of Construction, 2005" " Million U.S. Housing Units" ,,"Year of Construction" ,"Housing Units (millions)" ,,"Before 1940","1940 to...

344

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN  

E-Print Network [OSTI]

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

Florida, University of

345

Functional Facilities Management Energy Management Structure  

E-Print Network [OSTI]

Functional Facilities Management Energy Management Structure Jerome Malmquist Director Erick Van Controls Systems Jeff Davis Assistant Director, Facilities Engineering & Energy Efficiency Gene Husted Principal Engineer / Commissioning Emily Robin-Abbott St. Paul Energy Engineer & Technicians Supervisor Dan

Gulliver, Robert

346

Load Management for Industry  

E-Print Network [OSTI]

In the electric utility industry, load management provides the opportunity to control customer loads to beneficially alter a utility's load curve Load management alternatives are covered. Load management methods can be broadly classified into four...

Konsevick, W. J., Jr.

1982-01-01T23:59:59.000Z

347

IT Project Manager  

Broader source: Energy.gov [DOE]

This position is located in the IT Project Management Office (JP). A successful candidate in this position will serve as an IT Program Manager and technical expert responsible for directly managing...

348

IMPROVING ENERGY EFFICIENCY AND REDUCING COSTS IN THE DRINKING WATER SUPPLY INDUSTRY: An ENERGY STAR Resource Guide for Energy and Plant Managers  

E-Print Network [OSTI]

Efficiency Alliance, Electric Motor Management. 2001. Motor2002. United States Industrial Electric Motor Systems Marketaccessed March 23, Motors Electric motors represent one of

Brown, Moya Melody, Camilla Dunham Whitehead, Rich

2011-01-01T23:59:59.000Z

349

Managing Web Data Managing Web Data  

E-Print Network [OSTI]

Managing Web Data Dan Suciu AT&T Labs Managing Web Data Sigmod, 1999 Dan Suciu AT&T Labs 1 #12;How the Web is Today HTML documents all intended for human consumption many are generated automatically by applications Managing Web Data Sigmod, 1999 Dan Suciu AT&T Labs 2 #12;Paradigm Shift on the Web applications

Davulcu, Hasan

350

MATERIALS MANAGEMENT MATERIALS MANAGEMENT -INVENTORY CONTROL  

E-Print Network [OSTI]

MATERIALS MANAGEMENT MATERIALS MANAGEMENT - INVENTORY CONTROL NOTICE OF DESIGNATED DEPARTMENTAL OF MATERIALS MANAGEMENT ______ FURTHER INSTRUCTIONS 1. Include a copy of any relevant documents. 2. Item MATERIALS COORDINATOR ≠ IC-8 Mail, Fax or PDF the entire package to: MC 2010 Fax: 679-4240 REFERENCE # DMC

Oliver, Douglas L.

351

Creating an asset management model for Massachusetts state-aided public housing : a study of policies and practices to inform the Massachusetts Department of Housing and Community Development  

E-Print Network [OSTI]

Local housing authorities in the Commonwealth of Massachusetts currently manage over 50,000 state-aided public housing units on a consolidated, authority-wide level-a style of property management that does not allow for ...

Creeley, Hannah Highton

2009-01-01T23:59:59.000Z

352

Target Cost Management Strategy  

E-Print Network [OSTI]

Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

Okano, Hiroshi

1996-01-01T23:59:59.000Z

353

Stormwater Management Program (Pennsylvania)  

Broader source: Energy.gov [DOE]

Stormwater Management program of the Department of Environmental Protection's Bureau of Conservation and Restoration administers the rules and regulations for stormwater management for Pennsylvania...

354

Stormwater Management (Maryland)  

Broader source: Energy.gov [DOE]

Maryland's Stormwater Management Program, administered by the Department of the Environment, aims to reduce stormwater runoff. The program requires the submission of a stormwater management plan...

355

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

356

Records Management Specialist  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a Records Management Specialist in the Richland Operations Office (RL), Assistant Manager for Mission Support (AMMS), Infrastructure, Services...

357

Physics Department Management Review  

E-Print Network [OSTI]

ESSH Committee and Work Planning Security Cyber Security Accident and Incident Management was distributed to the ESSH Committee, Group Leaders, Group Safety Coordinators, and Line Management #12;Areas

Homes, Christopher C.

358

Management of Nuclear Materials  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements for the lifecycle management of DOE owned and/or managed accountable nuclear materials. Cancels DOE O 5660.1B.

2009-08-17T23:59:59.000Z

359

CASMO-3/SIMULATE-3 benchmark on Ringhals units  

SciTech Connect (OSTI)

Validation of the Studsvik Core Management System (Studsvik-CMS) is presented on Ringhals units 2, 3, and 4, Westinghouse three-loop, 157-assembly pressurized water reactors (PWRs) operated by the Swedish State Power Board (SSPB). The work is a part of the project to develop full in-house in-core fuel management (ICFM) capability based on a modern reactor physics methodology. The major codes of Studsvik-CMS are the cell data code CASMO-3 and the advanced nodal code SIMULATE-3. The SSPB has used CASMO-3 since its first reloads for both PWR and boiling water reactor units. The code SIMULATE-3 was recently installed for PWRs to replace conventional nodal core models and to obtain pin-power reconstruction capability. The Ringhals cores have several advanced features that make them especially interesting for testing the accuracy of modern nodal methods. The Ringhals units operate on an annual cycle with summer refueling. The analyzed cycles include base load, load-follow, and coastdown operation.

Kurcyusz-Ohlofsson, E.; Johansson, M.; Erikksson, M.; Bernro, R.; Hanberg, J.

1990-01-01T23:59:59.000Z

360

Site Management Guide (Blue Book)  

SciTech Connect (OSTI)

The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Departmentís postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOEís postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site cleanup is complete, LM accepts title to these sites on behalf of the United States and assumes long-term management.

None

2014-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

SUNY Programs: The United Kingdom  

E-Print Network [OSTI]

SUNY Programs: The United Kingdom & Ireland Semester, Academic Year and Short Term #12;1 Table of Contents How to Use This Booklet 1 Choosing a Program in the UK and Ireland 2 Exchange versus Study Abroad 3 Semester & Academic Year Programs 4 Programs in London 4 Programs outside of London 7 Programs

Suzuki, Masatsugu

362

UNITED STATES NUCLEAR REGULATORY COMMISSION  

E-Print Network [OSTI]

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS ON RADIATION THERAPY OVEREXPOSURES IN PANAMA Addressees All medical licensees. Purpose The U.S. Nuclear times resulted in significant radiation overexposures to patients. The hospital staff did not perform

363

University Assessment Contacts Academic Units  

E-Print Network [OSTI]

.j.arp@oregonstate.edu 541-737-2331 Notes: Agricultural and Resource Economics Assessment Rep: Email: Phone: Penelope DiebelUniversity Assessment Contacts Academic Units COLLEGE OF AGRICULTURAL SCIENCES Assessment Rep.Capalbo@oregonstate.edu 541-737-5639 Notes: Agricultural Education and Agricultural Sciences Assessment Rep: Email: Phone

Escher, Christine

364

ABPDU - Advanced Biofuels Process Demonstration Unit  

SciTech Connect (OSTI)

Lawrence Berkeley National Lab opened its Advanced Biofuels Process Demonstration Unit on Aug. 18, 2011.

None

2011-01-01T23:59:59.000Z

365

FISHERY STATISTICS OF THE UNITED STATES  

E-Print Network [OSTI]

FISHERY STATISTICS OF THE UNITED STATES 1946 BY A. W. ANDERSON and E. A. POWER UNITED STATES GOVERNMENT Statistics of the United States, 1946 #12;FISHERY STATISTICS OF THE UNITED STATES: 1946 By A. W. ANDERSON City 129 Section 4. - Chesapeake Fisheries 131 Sectional Summaries 133 Mary I and 137 Vi rginia 140

366

Closure Report for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) documents closure activities for Corrective Action Unit (CAU) 543, Liquid Disposal Units, according to the Federal Facility Agreement and Consent Order (FFACO, 1996) and the Corrective Action Plan (CAP) for CAU 543 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2007). CAU 543 is located at the Nevada Test Site (NTS), Nevada (Figure 1), and consists of the following seven Corrective Action Sites (CASs): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; CAS 15-23-03, Contaminated Sump, Piping; and CAS 06-07-01 is located at the Decontamination Facility in Area 6, adjacent to Yucca Lake. The remaining CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm in Area 15. The purpose of this CR is to provide a summary of the completed closure activities, to document waste disposal, and to present analytical data confirming that the remediation goals were met. The closure alternatives consisted of closure in place for two of the CASs, and no further action with implementation of best management practices (BMPs) for the remaining five CASs.

NSTec Environmental Restoration

2008-01-01T23:59:59.000Z

367

Shift manager workload assessment - A case study  

SciTech Connect (OSTI)

In early 2003, Bruce Power restarted two of its previously laid up units in the Bruce A generating station, Units 3 and 4. However, due to challenges relating to the availability of personnel with active Shift Manager licenses, an alternate shift structure was proposed to ensure the safe operation of the station. This alternate structure resulted in a redistribution of responsibility, and a need to assess the resulting changes in workload. Atomic Energy of Canada Limited was contracted to perform a workload assessment based on the new shift structure, and to provide recommendations, if necessary, to ensure Shift Managers had sufficient resources available to perform their required duties. This paper discusses the performance of that assessment, and lessons learned as a result of the work performed during the Restart project. (authors)

Berntson, K.; Kozak, A. [Bruce Power, P O Box 1540 B10, Tiverton, Ont. N0G 2T0 (Canada); Malcolm, J. S. [Atomic Energy of Canada Ltd., 2251 Speakman Drive, Mississauga, Ont. L5K 1B2 (Canada)

2006-07-01T23:59:59.000Z

368

Organization of ISI by Divisions and Constituent Units Information Sciences Division  

E-Print Network [OSTI]

Biological Sciences Division Agricultural and Ecological Research Unit Human Genetics Unit Biological Unit Canteen Security Unit Medical Welfare Unit Telephone Unit Transport Unit Guest House Audio Visual

Bandyopadhyay, Antar

369

Best Environmental Management Practices  

E-Print Network [OSTI]

Best Environmental Management Practices Farm Animal Production Comprehensive Nutrient Management with regulatory guidelines by addressing items such as manure management, field crop nutrients, and storm water What is a CNMP? A Comprehensive Nutrient Management Plan (CNMP) is a total planning tool that details

370

Environmental Best Management Practices  

E-Print Network [OSTI]

Environmental Best Management Practices for Virginia's Golf Courses Prepared by Virginia Golf Course Superintendents Association #12;#12;EnvironmEntal BEst managEmEnt PracticEs for virginia's golf III I am pleased to endorse the Environmental Best Management Practices for Virginia's Golf Courses

Liskiewicz, Maciej

371

Sport Management Academic Offerings  

E-Print Network [OSTI]

production and programming of events; marketing and public relations; technological operations management including (but not limited to) digital advertising, media law, new media business, operations managementSport Management Academic Offerings M.S. In Sport Venue And Event Management GRADUATE Chad Mc

Mather, Patrick T.

372

Chemical Management Contacts  

Broader source: Energy.gov [DOE]

Contacts for additional information on Chemical Management and brief description on Energy Facility Contractors Group

373

Mixed Waste Management Facility Groundwater Monitoring Report  

SciTech Connect (OSTI)

During fourth quarter 1997, eleven constituents exceeded final Primary Drinking Water Standards (PDWS) in groundwater samples from downgradient monitoring wells at the Mixed Waste Management Facility. No constituents exceeded final PDWS in samples from upgradient monitoring wells. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents. The groundwater flow directions and rates in the three hydrostratigraphic units were similar to those of previous quarters.

Chase, J.

1998-03-01T23:59:59.000Z

374

Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan  

SciTech Connect (OSTI)

A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

1992-06-01T23:59:59.000Z

375

Renewable energy atlas of the United States.  

SciTech Connect (OSTI)

The Renewable Energy Atlas (Atlas) of the United States is a compilation of geospatial data focused on renewable energy resources, federal land ownership, and base map reference information. It is designed for the U.S. Department of Agriculture Forest Service (USFS) and other federal land management agencies to evaluate existing and proposed renewable energy projects. Much of the content of the Atlas was compiled at Argonne National Laboratory (Argonne) to support recent and current energy-related Environmental Impact Statements and studies, including the following projects: (1) West-wide Energy Corridor Programmatic Environmental Impact Statement (PEIS) (BLM 2008); (2) Draft PEIS for Solar Energy Development in Six Southwestern States (DOE/BLM 2010); (3) Supplement to the Draft PEIS for Solar Energy Development in Six Southwestern States (DOE/BLM 2011); (4) Upper Great Plains Wind Energy PEIS (WAPA/USFWS 2012, in progress); and (5) Energy Transport Corridors: The Potential Role of Federal Lands in States Identified by the Energy Policy Act of 2005, Section 368(b) (in progress). This report explains how to add the Atlas to your computer and install the associated software; describes each of the components of the Atlas; lists the Geographic Information System (GIS) database content and sources; and provides a brief introduction to the major renewable energy technologies.

Kuiper, J.A.; Hlava, K.Greenwood, H.; Carr, A. (Environmental Science Division)

2012-05-01T23:59:59.000Z

376

United States and world energy sources  

SciTech Connect (OSTI)

This volume examines the economic, political, and social implications of the oil-dependence dilemma facing the United States. Most of the contributors are energy consultants in the public or private sector. Their analyses of the changing oil situation and its impact on other energy policies reflect either an international, national, or regional perspective with a unique combination of pragmatic insights and academic analyses of these complex issues. While examining the various aspects of the energy dependence dilemma presented here, one critical theme will probably recur to the reader. That is, given the inadequate nature of the US response to the 1973 and 1979 shortfalls in foreign oil supplies, how will we manage the projected future shortages in foreign oil supplies. The 18 papers of this volume were presented at a conference at Los Angeles in July 1980 and cosponsored by the University of Southern California and the California Energy Commission; a separate abstract was prepared for each paper. See also EAPA 7:3231 and Energy Research Abstracts (ERA) 6:18036.

Berg, L.L.; Baird, L.M.; Varanini, E.E. III (eds.)

1982-01-01T23:59:59.000Z

377

Beryllium Technology Research in the United States  

SciTech Connect (OSTI)

While most active research involving beryllium in the United States remains tied strongly to biological effects, there are several areas of technology development in the last two years that should be mentioned. (1) Beryllium disposed of in soil vaults at the Idaho National Laboratory (INL) Radioactive Waste Management Complex (RWMC) has been encapsulated in-situ by high-temperature and pressure injection of a proprietary wax based material to inhibit corrosion. (2) A research program to develop a process for removing heavy metals and cobalt from irradiated beryllium using solvent extraction techniques has been initiated to remove components that prevent the beryllium from being disposed of as ordinary radioactive waste. (3) The JUPITER-II program at the INL Safety and Tritium Applied Research (STAR) facility has addressed the REDOX reaction of beryllium in molten Flibe (a mixture of LiF and BeF2) to control tritium, particularly in the form of HF, bred in the Flibe by reactions involving both beryllium and lithium. (4) Work has been performed at Los Alamos National Laboratory to produce beryllium high heat flux components by plasma spray deposition on macro-roughened substrates. Finally, (5) corrosion studies on buried beryllium samples at the RWMC have shown that the physical form of some of the corroded beryllium is very filamentary and asbestos-like. This form of beryllium may exacerbate the contraction of chronic beryllium disease.

Glen R. Longhurst; Robert A. Anderl; M. Kay Adleer-Flitton; Gretchen E. Matthern; Troy J. Tranter; Kendall J. Hollis

2005-02-01T23:59:59.000Z

378

Information resource management concepts for records managers  

SciTech Connect (OSTI)

Information Resource Management (ERM) is the label given to the various approaches used to foster greater accountability for the use of computing resources. It is a corporate philosophy that treats information as it would its other resources. There is a reorientation from simply expenditures to considering the value of the data stored on that hardware. Accountability for computing resources is expanding beyond just the data processing (DP) or management information systems (MIS) manager to include senior organization management and user management. Management`s goal for office automation is being refocused from saving money to improving productivity. A model developed by Richard Nolan (1982) illustrates the basic evolution of computer use in organizations. Computer Era: (1) Initiation (computer acquisition), (2) Contagion (intense system development), (3) Control (proliferation of management controls). Data Resource Era: (4) Integration (user service orientation), (5) Data Administration (corporate value of information), (6) Maturity (strategic approach to information technology). The first three stages mark the growth of traditional data processing and management information systems departments. The development of the IRM philosophy in an organization involves the restructuring of the DP organization and new management techniques. The three stages of the Data Resource Era represent the evolution of IRM. This paper examines each of them in greater detail.

Seesing, P.R.

1992-10-01T23:59:59.000Z

379

Feasibility Study for Operable Unit 7-13/14  

SciTech Connect (OSTI)

The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

K. Jean Holdren; Thomas E. Bechtold; Brian D. Preussner

2007-05-29T23:59:59.000Z

380

Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447  

SciTech Connect (OSTI)

This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 447, as specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense (DOD), and the State of Nevada, includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the PSA.

None

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Management of corrective action wastes pursuant to proposed Subpart S  

SciTech Connect (OSTI)

Under Section 3004(u) of the Resource Conservation and Recovery Act (RCRA), owners/operators of permitted or interim status treatment, storage, and disposal facilities (TSDFs) are required to perform corrective action to address releases of hazardous waste or hazardous constituents from solid waste management units (SWMUs). On July 27, 1990, the Environmental Protection Agency (EPA) proposed specific corrective action requirements under Part 264, Subpart S of Title 40 of the code of Federal Regulations (CFR). One portion of this proposed rule, addressing requirements applicable to corrective action management units (CAMUs) and temporary units (TUs), was finalized on February 16, 1993 (58 FR 8658 et seq.). (CAMUs and TUs are RCRA waste management units that are specifically designated for the management of corrective action wastes). Portions of the proposed Subpart S rule that address processes for the investigation and cleanup of releases to environmental media have not yet been finalized. EPA and authorized State agencies, however, are currently using the investigation and cleanup procedures of the proposed rule as a framework for implementation of RCRA`s corrective action requirements. The performance of corrective action cleanup activities generates wastes that have to be characterized and managed in accordance with applicable RCRA requirements. This Information Brief describes these requirements. It is one of a series of information Briefs on RCRA Corrective Action.

Not Available

1995-02-01T23:59:59.000Z

382

Managing Commercial Tree Species for Timber Production and Carbon Sequestration: Management Guidelines and Financial Returns  

SciTech Connect (OSTI)

A carbon credit market is developing in the United States. Information is needed by buyers and sellers of carbon credits so that the market functions equitably and efficiently. Analyses have been conducted to determine the optimal forest management regime to employ for each of the major commercial tree species so that profitability of timber production only or the combination of timber production and carbon sequestration is maximized. Because the potential of a forest ecosystem to sequester carbon depends on the tree species, site quality and management regimes utilized, analyses have determined how to optimize carbon sequestration by determining how to optimally manage each species, given a range of site qualities, discount rates, prices of carbon credits and other economic variables. The effects of a carbon credit market on the method and profitability of forest management, the cost of sequestering carbon, the amount of carbon that can be sequestered, and the amount of timber products produced has been determined.

Gary D. Kronrad

2006-09-19T23:59:59.000Z

383

Process management principles for increasing the energy efficiency of manufacturing operations  

E-Print Network [OSTI]

Energy usage is a significant operating cost for manufacturing facilities in the United States, and interest in energy management has been rising of late, 2, 3]. One approach, recommended by the Environmental Protection ...

Espindle, L. P. (Leo P.)

2011-01-01T23:59:59.000Z

384

Approved CAMU equals faster, better, cheaper remediation at the Fernald Environmental Management Project  

SciTech Connect (OSTI)

A 1,050 acre Corrective Action Management Unit (CAMU) was approved for the Fernald Protection Agency Environmental Management Project (FEMP) by the US Environmental Protection Agency (USEPA) to manage environmental media remediation waste in the Operable Unit 5 Record of Decision, 1995. Debris is also proposed for management as remediation waste under the CAMU Rule in the Operable Unit 3 Remedial Investigation/Feasibility Study (RI/FS) Report, as of December 1995. Application of the CAMU Rule at the FEMP will allow consolidation of low-level mixed waste and hazardous waste that presents minimal threat from these two operable units in an on-property engineered disposal facility without triggering land disposal restrictions (LDRs). The waste acceptance criteria for the on property disposal facility are based on a combination of site-specific risk-based concentration standards, as opposed to non-site-specific requirements imposed by regulatory classifications.

Dupuis-Nouille, E.M. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States)] [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Goidell, L.C.; Strimbu, M.J. [Jacobs Engineering Co., Cincinnati, OH (United States)] [Jacobs Engineering Co., Cincinnati, OH (United States); Nickel, K.A. [US Dept. of Energy-Fernald, CIncinnati, OH (United States)] [US Dept. of Energy-Fernald, CIncinnati, OH (United States)

1996-03-01T23:59:59.000Z

385

Bridging the divide : incorporating local ecological knowledge into U.S. natural resource management  

E-Print Network [OSTI]

For the past 100 years, natural resource management in the United States has reflected a belief that the top-down application of science to predict and control the natural world will, in the words of Gifford Pinchot, the ...

Schulman, Alexis

2007-01-01T23:59:59.000Z

386

New techniques in project portfolio management don't stifle innovation with excessive phasing and gates  

E-Print Network [OSTI]

Managing multiple ideas, candidate initiatives and in-flight projects across diverse business units is a large challenge for major organizations. Overseeing global demand for projects as well as resource needs, risks, ...

Fisher, Cameron (Cameron Ardell Mayhew)

2014-01-01T23:59:59.000Z

387

Scott M. Kaufman US Project Manager The Carbon Trust Brooklyn, NY January 2009 -present  

E-Print Network [OSTI]

. Helped design and install small-scale composting units at institutions in NYC. Taught 7 week course partner cities. Manager, Manhattan Compost Program NYC Dept. of Sanitation / The New York Botanical

388

DOE/LX/07-0301&D1 Secondary Document DMSA OS-14 Solid Waste Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1&D1 Secondary Document DMSA OS-14 Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 225 DATE OF ORIGINAL SAR: 120100 DATE OF SAR REVISIONS: 031509, 0115...

389

DOE/LX/07-0183&D1 Secondary Document DMSA OS-18 Solid Waste Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3&D1 Secondary Document DMSA OS-18 Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 229 DATE OF ORIGINAL SAR: 120100 DATE OF SAR REVISIONS: 52803, 031509...

390

DOE/LX/07-0299&D1 Secondary Document DMSA OS-06 Solid Waste Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9&D1 Secondary Document DMSA OS-06 Solid Waste Management Unit (SWMU) Assessment Report SWMUAOC NUMBER: 217 DATE OF ORIGINAL SAR: 120100 DATE OF SAR REVISIONS: 100703, 0115...

391

Trading zones : cooperating for water resource and ecosystem management when stakeholders have apparently irreconcilable differences  

E-Print Network [OSTI]

Disputes over the management of water resources in the United States often seem irreconcilable because stakeholders' differences in values, beliefs, and identities are so hard to resolve. Yet, while many efforts to resolve ...

Fuller, Boyd

2006-01-01T23:59:59.000Z

392

Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

2002-05-20T23:59:59.000Z

393

HE ELECTRIC POWER INDUSTRY in the United States is facing a disquieting shortage  

E-Print Network [OSTI]

, wholesale and retail electricity marketing, reactive power management, and other ancillary support systemsT HE ELECTRIC POWER INDUSTRY in the United States is facing a disquieting shortage of trained lower than those of vir- tually all other electrical engineers. Student enroll- ments have steadily

394

Reforming Household Energy Markets: Some Welfare Effects in the United Catherine Waddams Price  

E-Print Network [OSTI]

final energy prices (though those of monopoly inputs such as transmission and distribution remainReforming Household Energy Markets: Some Welfare Effects in the United Kingdom by Catherine Waddams Price Centre for Competition and Regulation and School of Management University of East Anglia, UK

Feigon, Brooke

395

United States General Accounting Office GAO Report to the Secretary of  

E-Print Network [OSTI]

United States General Accounting Office GAO Report to the Secretary of Transportation February 1997 the year 2015. Through this enormous investment, FAA plans to put in place 1 The 1996 Clinger-Cohen Act, P and Information Management Division B-271527 February 3, 1997 The Honorable Federico Pe√Īa Secretary

Ladkin, Peter B.

396

Advanced secondary recovery demonstration for the Sooner Unit. Annual report, October 1992--May 1993  

SciTech Connect (OSTI)

The objectives of this project are to demonstrate the effectiveness of a multi-diciplinary approach to targeted infill drilling and improved reservoir management. The first phase involves geophysical, geological, and engineering data acquisition and analysis to identify optimum well sites and to develop a reservoir operations plan. This report summarizes activities concerned with phase I of the Sooner Unit Project.

Sippel, M.; Junkin, J.; Pritchett, R. [and others

1995-07-01T23:59:59.000Z

397

Information resource management concepts for records managers  

SciTech Connect (OSTI)

Information Resource Management (ERM) is the label given to the various approaches used to foster greater accountability for the use of computing resources. It is a corporate philosophy that treats information as it would its other resources. There is a reorientation from simply expenditures to considering the value of the data stored on that hardware. Accountability for computing resources is expanding beyond just the data processing (DP) or management information systems (MIS) manager to include senior organization management and user management. Management's goal for office automation is being refocused from saving money to improving productivity. A model developed by Richard Nolan (1982) illustrates the basic evolution of computer use in organizations. Computer Era: (1) Initiation (computer acquisition), (2) Contagion (intense system development), (3) Control (proliferation of management controls). Data Resource Era: (4) Integration (user service orientation), (5) Data Administration (corporate value of information), (6) Maturity (strategic approach to information technology). The first three stages mark the growth of traditional data processing and management information systems departments. The development of the IRM philosophy in an organization involves the restructuring of the DP organization and new management techniques. The three stages of the Data Resource Era represent the evolution of IRM. This paper examines each of them in greater detail.

Seesing, P.R.

1992-10-01T23:59:59.000Z

398

Management and Program Analyst (Operations Manager)  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a Management and Program Analyst in the Office of Strategic Programs in the DOE-EERE.

399

Systems of Units Systems of units fall into three general categories (see Table 1. below)  

E-Print Network [OSTI]

in astrophysics and in particle dynamics. It is less convenient on earth, where we keep having to calculate static in English units. In industrial metric units, we still ...nd kgf /cm2 , sometimes UNITS Force Mass Accel. gc

400

Electrical Demand Management  

E-Print Network [OSTI]

bination of a 2200 ton, the 1200 ton and the 800 ton units or by two 2200 ton units. We sought to di sp 1ace the 1200 ton or part of a 2200 ton unit with two steam turbi ne chill ers duri ng peak hours at a total reduced cost for supplying all building...

Fetters, J. L.; Teets, S. J.

1983-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration  

E-Print Network [OSTI]

, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL ­ Supply chains and logistics ­ Systems of systems (e.g., the nuclear fuel cycle, fleet management) #12

Langerhans, Brian

402

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network [OSTI]

DIVISION Waste Management Quality Assurance ImplementingI I IMPLEMENTING MANAGEMENT QUALITY PLAN ASSURANCE I lilillI WM-QAIMP Waste Management Quality Assurance Implementing

Albert editor, R.

2009-01-01T23:59:59.000Z

403

Fusing Integration Test Management with Change Management  

E-Print Network [OSTI]

- 1 - Infuse: Fusing Integration Test Management with Change Management Gail E. Kaiser* Dewayne E, NJ 07974 Murray Hill, NJ 07974 Infuse is an experimental software development environment focusing the change set into the baseline. We have previously described how Infuse enforces static consistency at each

Perry, Dewayne E.

404

The Sentara Mobile Mammography Unit | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Sentara Mobile Mammography Unit The Sentara Mobile Mammography Unit will be here at Jefferson Lab on December 11, 2014 from 9 a.m.-2 p.m. Mammography detects breast cancer and...

405

Meteorological database for the United States  

E-Print Network [OSTI]

to Indoor Air Meteorological Database for the United StatesUC-402 Meteorological Database for the United States M.G.Abstract A meteorological database has been developed to aid

Apte, M.G.

2011-01-01T23:59:59.000Z

406

United Cooperative | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformation UC 19-6-401 et seq.NorthUniopolis, Ohio: EnergyIncJumpUnited

407

United Nations | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformation UC 19-6-401 et seq.NorthUniopolis, Ohio:LowPopulationUnited

408

Second United Nations International Conference  

Office of Scientific and Technical Information (OSTI)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinan antagonist Journal Article: Crystal structureComposite ForPropertiesto earthAudioSwitchSecond United

409

Compact monolithic capacitive discharge unit  

DOE Patents [OSTI]

A compact monolithic capacitive discharge unit (CDU) is disclosed in which a thyristor switch and a flyback charging circuit are both sandwiched about a ceramic energy storage capacitor. The result is a compact rugged assembly which provides a low-inductance current discharge path. The flyback charging circuit preferably includes a low-temperature co-fired ceramic transformer. The CDU can further include one or more ceramic substrates for enclosing the thyristor switch and for holding various passive components used in the flyback charging circuit. A load such as a detonator can also be attached directly to the CDU.

Roesler, Alexander W. (Tijeras, NM); Vernon, George E. (Rio Rancho, NM); Hoke, Darren A. (Albuquerque, NM); De Marquis, Virginia K. (Tijeras, NM); Harris, Steven M. (Albuquerque, NM)

2007-06-26T23:59:59.000Z

410

Efficiency United (Gas)- Commercial Efficiency Program  

Broader source: Energy.gov [DOE]

The Efficiency United Program, administered by CLEAResult Consulting, provides commercial gas incentives for the following Michigan utilities:

411

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

Waste Management Group

2006-01-01T23:59:59.000Z

412

Ground Water Management Act (Virginia)  

Broader source: Energy.gov [DOE]

Under the Ground Water Management Act of 1992, Virginia manages ground water through a program regulating the withdrawals in certain areas called Ground Water Management Areas (GWMA). Currently,...

413

" Million U.S. Housing Units,...  

U.S. Energy Information Administration (EIA) Indexed Site

in Buildings" "With 5 or More Units)",19.1,7,5.2,3.2,1.8,0.9,0.3,0.8,4.5 "FoundationBasement of Single-Family" "Units and Apartments in Buildings With" "2 to 4 Units...

414

Municipal Solid Waste in The United States  

E-Print Network [OSTI]

2011 Facts and Figures Municipal Solid Waste in The United States #12;United States Environmental Protection Agency Office of Solid Waste (5306P) EPA530-R-13-001 May 2013 www.epa.gov #12;MUNICIPAL SOLID WASTE IN THE UNITED STATES: 2011 FACTS AND FIGURES Table of Contents Chapter Page MUNICIPAL SOLID WASTE

Barlaz, Morton A.

415

UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE  

E-Print Network [OSTI]

UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE UNITED NATIONS 1992 FCCC/INFORMAL/84 GE.05-62220 (E) 200705 #12;UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE The Parties to this Convention in predictions of climate change, particularly with regard to the timing, magnitude and regional patterns thereof

Laughlin, Robert B.

416

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

417

Environmental Management Systems (Iowa)  

Broader source: Energy.gov [DOE]

A solid waste planning area (e.g., the land encompassed by a municipality with a comprehensive solid waste management policy) may qualify to be an Environmental Management System if it provides...

418

Business, management and finance  

E-Print Network [OSTI]

Business, management and finance Essentials Taught degrees Masters in Business Administration (MBA) MSc in Banking and Finance MSc in Corporate and Financial Risk Management MSc in Financial Mathematics MSc in International Accounting and Corporate Governance MSc in International Finance MSc

Sussex, University of

419

Coastal Management Act (Georgia)  

Broader source: Energy.gov [DOE]

The Coastal Management Act provides enabling authority for the State to prepare and administer a coastal management program. The Act does not establish new regulations or laws; it is designed to...

420

ENVIRONMENTAL MANAGEMENT Environmental Policy  

E-Print Network [OSTI]

ENVIRONMENTAL MANAGEMENT Environmental Policy February 2013 The University of Leeds is responsible to reflect best environmental practice, implement an environmental management system to pursue sustainability and continuous improvement and seek innovative ways of meeting environmental objectives. These include: To meet

Haase, Markus

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Environmental Management System Plan  

E-Print Network [OSTI]

management Water conservation LBNLís approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

422

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

423

Management of Nuclear Materials  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements for the lifecycle management of DOE owned and/or managed accountable nuclear materials. Cancels DOE O 410.2. Admin Chg 1 dated 4-10-2014, cancels DOE O 410.2.

2009-08-17T23:59:59.000Z

424

DECENTRALIZED WASTEWATER MANAGEMENT  

E-Print Network [OSTI]

1 DECENTRALIZED WASTEWATER MANAGEMENT: A GUIDEBOOK FOR GEORGIA COMMUNITIES Katie Sheehan wastewater treatment technologies. www.njunsystems.com Version 1.0, April 2013 #12; 2 DECENTRALIZED WASTEWATER MANAGEMENT: A GUIDEBOOK FOR GEORGIA COMMUNITIES PART ONE: BACKGROUND, ISSUES, AND PROGRAM

Rosemond, Amy Daum

425

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

426

Managing Director Buildings, Transportation  

E-Print Network [OSTI]

Site Development Will Terris Manager Gardening Maintenance Jim Gish Manager Landscape Specialty Tegwyn Maintenance and project Delivery Scott Sherwood Director Transportation Services Glenl Wear Director Grounds Supervisor Specialty Crews 17 Area supervisors Custodial Maintenance Charles Anderson Supervisor Activity

Seamons, Kent E.

427

Risk Management Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides non-mandatory risk management approaches for implementing the requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. Cancels DOE G 413.3-7.

2011-01-18T23:59:59.000Z

428

Best Environmental Management Practices  

E-Print Network [OSTI]

Best Environmental Management Practices Farm Animal Production Disposal of Farm Medical Wastes Dan Vitamins and minerals Topical Medications Sprays Dewormers Ointments #12;Best Environmental Management of environmental contamination with chemicals or infectious agents. These include, among others: Injectable

429

INVENTORY MANAGEMENT PROBLEM A particular material is used in manufacturing a  

E-Print Network [OSTI]

1 INVENTORY MANAGEMENT PROBLEM · A particular material is used in manufacturing a product. An initial inventory of 10 units is on hand. The maximum inventory capacity is 20 units. An inventory of 8 of keeping the material in inventory is 0.25 per month. · Contractual obligations require production which

Shier, Douglas R.

430

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

431

RCRA Facility Investigation/Remedial Investigation Report for the Gunsite 113 Access Road Unit (631-24G) - March 1996  

SciTech Connect (OSTI)

Gunsite 113 Access Road Unit is located in the northeast corner of SRS. In the mid 1980`s, sparse vegetation, dead trees, and small mounds of soil were discovered on a portion of the road leading to Gunsite 113. This area became the Gunsite 113 Access Road Unit (Gunsite 113). The unit appears to have been used as a spoil dirt and / or road construction debris disposal area. There is no documentation or record of any hazardous substance management, disposal, or any type of waste disposal at this unit. Based upon the available evidence, there are no potential contaminants of concern available for evaluation by a CERCLA baseline risk assessment. Therefore, there is no determinable health risk associated with Gunsite 113. In addition, it is also reasonable to conclude that, since contamination is below risk-based levels, the unit presents no significant ecological risk. It is recommended that no further remedial action be performed at this unit.

Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1996-03-01T23:59:59.000Z

432

Management of National Nuclear Power Programs for assured safety  

SciTech Connect (OSTI)

Topics discussed in this report include: nuclear utility organization; before the Florida Public Service Commission in re: St. Lucie Unit No. 2 cost recovery; nuclear reliability improvement and safety operations; nuclear utility management; training of nuclear facility personnel; US experience in key areas of nuclear safety; the US Nuclear Regulatory Commission - function and process; regulatory considerations of the risk of nuclear power plants; overview of the processes of reliability and risk management; management significance of risk analysis; international and domestic institutional issues for peaceful nuclear uses; the role of the Institute of Nuclear Power Operations (INPO); and nuclear safety activities of the International Atomic Energy Agency (IAEA).

Connolly, T.J. (ed.)

1985-01-01T23:59:59.000Z

433

Benchmarking Corporate Energy Management  

E-Print Network [OSTI]

BENCHMARKING CORPORATE ENERGY MANAGEMENT Dr. Douglas L. Norland Director of Research and Industrial Programs Alliance to Save Energy Washington, DC ABSTRACT There is growing interest among energy managers in finding out how their company...'s energy management procedures and perfonnance compare to that of other companies. Energy management involves everything from setting goals and targets to implementing best maintenance practices. This paper, however, discusses benchmarking energy...

Norland, D. L.

434

Wildlife Management Areas (Florida)  

Broader source: Energy.gov [DOE]

Certain sites in Florida are designated as wildlife management areas, and construction and development is heavily restricted in these areas.

435

Implementing Management Systems-Based Assessments  

SciTech Connect (OSTI)

A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'~arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES&H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in centralized management systems. The resulting corporate management system gives the appearance of an assembly of multiple, nearly independent operating units. The executive management system maintains these separate units, encouraging autonomy and creativity by establishing a minimum of requirements and procedures. In any organization, senior management has a responsibility to ensure that all operating units are meeting requirements. Part of this responsibility is fulfilled by conducting oversight or assurance activities, to determine the effectiveness of established systems in meeting requirements and performance expectations. Internal independent assessment is one of these assurance activities. Independent appraisals are combined with external audits and appraisals, self-assessments, peer reviews, project reviews, and other internal and external audits (e.g., financial, contractual) for a more complete assurance view. At SNL, internal independent appraisals are performed by the Audit Center, which reports directly to the Executive Vice President. ES&H independent appraisals are the responsibility of the ES&H and Quality Assessments Department, with a staff complement of eight. With our organization's charter to perform internal, independent appraisals, we set out to develop an approach and associated tools, which would be useful in the overall SNL environment and within our resource limitations.

Campisi, John A.; Reese, Robert T.

1999-05-03T23:59:59.000Z

436

Workforce Management Office (WFMO) Functional Statements WORKFORCE MANAGEMENT OFFICE  

E-Print Network [OSTI]

, and destruction. BMD oversees WFMO's personal property management, Freedom of Information Act responses, Entry, organizing, and administering comprehensive human resources management programs in collaboration wMay 2014 Workforce Management Office (WFMO) ­ Functional Statements WORKFORCE MANAGEMENT OFFICE

437

Medical Management Treatment Manual  

E-Print Network [OSTI]

Medical Management Treatment Manual: A Clinical Guide for Researchers and Clinicians) This manual is an adaptation of: Medical Management Treatment Manual: A Clinical Research Guide for Medically, Maryland #12;Message to the Users of this Medical Management (MM) Manual from the Editors Background

Bezrukov, Sergey M.

438

Operating System Resource Management  

E-Print Network [OSTI]

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location constrained. This talk will propose a scheme for addressing the operating system resource management problem Sciences Seminar Series presents Pacific Northwest National Laboratory Resource management is the dynamic

439

FRESH THINKING FOR MANAGEMENT  

E-Print Network [OSTI]

FOR TECHNOLOGY MANAGEMENT Technology Acceptance in Organizations: What Can We Do to Improve it? by Patricia in organizations is thus an important topic in both management research and management practice. Technology choice of a mobile phone. In organizations, there are two steps in technology adoption. First

Yang, Eui-Hyeok

440

Business, management and finance  

E-Print Network [OSTI]

Business, management and finance Essentials Taught degrees Masters in Business Administration (MBA) MSc in Banking and Finance MSc in Corporate and Financial Risk Management MSc in Financial Mathematics in International Accounting and Corporate Governance MSc in International Finance MSc in International Management

Sussex, University of

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Financial Management Oversight  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines requirements for effective financial management and adherence to DOE and applicable external financial management requirements and sets forth standards for ensuring the integrity and responsiveness of financial management and the accuracy and reliability of DOEs financial statements. Cancels DOE O 2200.13.

2006-08-31T23:59:59.000Z

442

Best Environmental Management Practices  

E-Print Network [OSTI]

Best Environmental Management Practices Farm Animal Production Land Application of Manure management practices to avoid polluting surface or groundwater. 1. Public and private water wells Public pollution of surface waters increases. Therefore, to avoid this risk, manure P loadings should be managed

443

Database Management Certificate Program  

E-Print Network [OSTI]

Database Management Certificate Program DATABASE TECHNOLOGIES 13 Today, organizations in every to obtain general data analysis and management skills or apply both Oracle and Microsoft SQL Server database capabilities of relational databases in conjunction with the new "Big Data" management frameworks for data

Rose, Michael R.

444

Sport Management Academic Offerings  

E-Print Network [OSTI]

production and programming of events; marketing and public relations; technological operations management Exploration of a topic (to be determined) not covered by the standard curriculum but of interest to faculty and sponsoring events. Management process, including theory of management and practical applications within

Raina, Ramesh

445

Environmental Management at  

E-Print Network [OSTI]

: ANUgreen for the HotRot Organic Recycling Project Sustainable Transport Category Winner: LEAD Development Themes: 1. Community Engagement 2. Energy and Greenhouse Management 3. Water Management 4. Recycling and Waste Management 5. Transport 6. Pollution Prevention and Environmental Risk 7. Biodiversity The Future

446

Resource Conservation and Recovery Act (RCRA) Part B permit application for container storage units at the Oak Ridge Y-12 Plant  

SciTech Connect (OSTI)

This document contains Part B of the Permit Application for Container Storage Units at the Oak Ridge Y-12 Plant. Sections cover the following areas: Facility description; Waste characteristics; Process information; Ground water monitoring; Procedures to prevent hazards; Contingency plan; Personnel training; Closure plan, post closure plan, and financial requirements; Recordkeeping; Other federal laws; Organic air emissions; Solid waste management units; and Certification.

Not Available

1994-08-01T23:59:59.000Z

447

1987 Oak Ridge model conference: Proceedings: Volume I, Part 3, Waste Management  

SciTech Connect (OSTI)

A conference sponsored by the United States Department of Energy (DOE), was held on waste management. Topics of discussion were transuranic waste management, chemical and physical treatment technologies, waste minimization, land disposal technology and characterization and analysis. Individual projects are processed separately for the data bases. (CBS)

Not Available

1987-01-01T23:59:59.000Z

448

udall centerfor studies in public policy native nations institutefor leadership, management, and policy  

E-Print Network [OSTI]

, School of Natural Resources and the Environment; director, Joint International Unit on Water, Environment and Policy (UMI) Operations Stephanie Carroll Rainie, M.P.H., manager Kim Harlow, B.S., assistant.A., operations manager Tarissa Spoonhunter, M.A., graduate research assoc. Charissa Delmar, undergraduate

McCallum, William G.

449

The effect of thermal contact resistance on heat management in the electronic packaging  

E-Print Network [OSTI]

The effect of thermal contact resistance on heat management in the electronic packaging M. Grujicic the role of thermal contact resistance on heat management within a simple central processing unit (CPU interface materials on the maximum temperature experienced by the CPU. Two classes of thermal interface

Grujicic, Mica

450

Hydrocarbons Heterogeneous Pyrolysis: Experiments and Modeling for Scramjet Thermal Management  

E-Print Network [OSTI]

1 Hydrocarbons Heterogeneous Pyrolysis: Experiments and Modeling for Scramjet Thermal Management : United States (2008)" #12;2 I. Introduction One of the main issues of the development of scramjet, an air to the endothermicity of its thermal decomposition. Because of the large heat load found in a scramjet, engine

Paris-Sud XI, Université de

451

Optimal Power Cost Management Using Stored Energy in Data Centers  

E-Print Network [OSTI]

Optimal Power Cost Management Using Stored Energy in Data Centers Rahul Urgaonkar, Bhuvan Urgaonkar of uninterrupted power supply (UPS) units as energy storage devices. This rep- resents a deviation from the usual average electric utility bill in a data center. Us- ing the technique of Lyapunov optimization, we develop

Giles, C. Lee

452

Optimal Power Cost Management Using Stored Energy in Data Centers  

E-Print Network [OSTI]

the aver- age price of 1 MW-Hour of electricity. Consequently, mini- mization of energy consumption needOptimal Power Cost Management Using Stored Energy in Data Centers Rahul Urgaonkar, Bhuvan Urgaonkar that arise by the use of uninterrupted power supply (UPS) units as energy storage devices. This rep- resents

Urgaonkar, Bhuvan

453

Sleep Management on Multiple Machines for Energy and Flow Time  

E-Print Network [OSTI]

too many machines would waste energy, while using too few would affect the performance. This paper than 1.5% of the total electricity usage of United States [21]. When a machine (or server) is onSleep Management on Multiple Machines for Energy and Flow Time Sze-Hang Chan Tak-Wah Lam Lap

Lam, Tak-Wah

454

HIERARCHICAL MANAGEMENT OF BATTLEFIELD NETWORKS WITH THE SHAMAN MANAGEMENT SYSTEM  

E-Print Network [OSTI]

HIERARCHICAL MANAGEMENT OF BATTLEFIELD NETWORKS WITH THE SHAMAN MANAGEMENT SYSTEM Adarshpal S with a description of the SHAMAN system and briefly introduces its applica- tions to the management of tactical for MANagement). This management system developed at the Network Management Laboratory of the Univer- sity

Sethi, Adarshpal

455

Hanford Site waste management and environmental restoration integration plan  

SciTech Connect (OSTI)

The Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs.

Merrick, D.L.

1990-04-30T23:59:59.000Z

456

CAMPUS BLUEPRINT ENROLLMENT MANAGEMENT COUNCIL'S  

E-Print Network [OSTI]

CAMPUS BLUEPRINT ENROLLMENT MANAGEMENT COUNCIL'S STRATEGIC ENROLLMENT MANAGEMENT PLAN 2012'S ENROLLMENT MANAGEMENT COUNCIL'S STRATEGIC ENROLLMENT MANAGEMENT PLAN 2012-2017 Report Outline Building a Big: Student Recruitment Initiatives Sharing Our Story of Quality Improving the Academic Profile and Student

Powers, Robert

457

CSREES Nutrient Management Working Meeting  

E-Print Network [OSTI]

planning process ≠ Nutrient management training ≠ P-Indexes and tools developed ≠ Educational materials #12Welcome CSREES Nutrient Management Working Meeting May 4 and 5, 2004 Atlanta, GA #12;University Objectives ∑ Information Sharing Among States ≠ Nutrient management regulations ≠ Nutrient management

458

Radioactive Waste Management Basis  

SciTech Connect (OSTI)

The purpose of this Radioactive Waste Management Basis is to describe the systematic approach for planning, executing, and evaluating the management of radioactive waste at LLNL. The implementation of this document will ensure that waste management activities at LLNL are conducted in compliance with the requirements of DOE Order 435.1, Radioactive Waste Management, and the Implementation Guide for DOE Manual 435.1-1, Radioactive Waste Management Manual. Technical justification is provided where methods for meeting the requirements of DOE Order 435.1 deviate from the DOE Manual 435.1-1 and Implementation Guide.

Perkins, B K

2009-06-03T23:59:59.000Z

459

UnitedStates EnvironmentalProtection  

E-Print Network [OSTI]

),theDOEOfficeofEnvironmentalRes- toration and WasteManagement(EM),and the NuclearRegulatoryCommission(NRC)Officeof Nuclear radioactivematerialsandsitesin theNRC'sSite Decommissioning Management Program (SDMP). Contents of Report Thereport includesan

460

Strategies for Successful Energy Management  

Broader source: Energy.gov [DOE]

This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on energy management for the portfolio manager initiative

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Energy Management Working Group: Accelerating Energy Management  

E-Print Network [OSTI]

Countries participating in the Global Superior Energy Performance (GSEP) Energy Management Working Group (EMWG) are leveraging their resources and taking collective action to strengthen national and international efforts to facilitate the adoption...

Scheihing, P.

2014-01-01T23:59:59.000Z

462

Rangeland Drought Management for Texans: Livestock Management  

E-Print Network [OSTI]

Livestock producers need to create flexible plans for dealing with drought. This publication explains the steps that should be included in such a plan, including taking a forage inventory, using stocker animals, establishing a livestock management...

Carpenter, Bruce B.; Hart, Charles R.

2001-04-24T23:59:59.000Z

463

A Manager's Approach to Energy Cost Management  

E-Print Network [OSTI]

A major responsibility of management is the control and containment of operating costs. Energy costs are a major portion of the industrial budget. GM has developed a 3 phase approach to energy conservation. Phase I -Administrative Controls...

Spencer, R. J.

464

National briefing summaries: Nuclear fuel cycle and waste management  

SciTech Connect (OSTI)

The National Briefing Summaries is a compilation of publicly available information concerning the nuclear fuel cycle and radioactive waste management strategies and programs of 21 nations, including the United States and three international agencies that have publicized their activities in this field. It presents available highlight information with references that may be used by the reader for additional information. The information in this document is compiled primarily for use by the US Department of Energy and other US federal agencies and their contractors to provide summary information on radioactive waste management activities in other countries. This document provides an awareness to managers and technical staff of what is occurring in other countries with regard to strategies, activities, and facilities. The information may be useful in program planning to improve and benefit United States' programs through foreign information exchange. Benefits to foreign exchange may be derived through a number of exchange activities.

Schneider, K.J.; Lakey, L.T.; Silviera, D.J.

1988-12-01T23:59:59.000Z

465

Policy Options for Encouraging Energy Efficiency Best Practices in Shandong Province's Cement Industry  

E-Print Network [OSTI]

and Evaluation of Energy Intensity per GDP Indicators ( ???Statistics on Energy Consumption Per Unit of GDP. 2006,tce/10,000 RMB Energy Consumption per unit of GDP (tonne of

Price, Lynn

2013-01-01T23:59:59.000Z

466

Plutonium Finishing Plan (PFP) Treatment and Storage Unit Interim Status Closure Plan  

SciTech Connect (OSTI)

This document describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) Treatment and Storage Unit. The PFP Treatment and Storage Unit is located within the 234-52 Building in the 200 West Area of the Hanford Facility. Although this document is prepared based upon Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the PFP Treatment and Storage Unit manages transuranic mixed (TRUM) waste, there are many controls placed on management of the waste. Based on the many controls placed on management of TRUM waste, releases of TRUM waste are not anticipated to occur in the PFP Treatment and Storage Unit. Because the intention is to clean close the PFP Treatment and Storage Unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. The PFP Treatment and Storage Unit will be operated to immobilize and/or repackage plutonium-bearing waste in a glovebox process. The waste to be processed is in a solid physical state (chunks and coarse powder) and will be sealed into and out of the glovebox in closed containers. The containers of immobilized waste will be stored in the glovebox and in additional permitted storage locations at PFP. The waste will be managed to minimize the potential for spills outside the glovebox, and to preclude spills from reaching soil. Containment surfaces will be maintained to ensure integrity. In the unlikely event that a waste spill does occur outside the glovebox, operating methods and administrative controls will require that waste spills be cleaned up promptly and completely, and a notation will be made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge.

PRIGNANO, A.L.

2000-07-01T23:59:59.000Z

467

United States Government National Nuclear Security Administration...  

Broader source: Energy.gov (indexed) [DOE]

United States Government National Nuclear Security Administration (NNSA) Savannah River Field Office (SRFO) Memorandum DATE: January 10, 2014 REPLY TO ATTN OF: sv (McAlhany,...

468

Optimization Online - Toward Scalable Stochastic Unit Commitment ...  

E-Print Network [OSTI]

May 16, 2014 ... Using a variant of the WECC-240 test case with 85 thermalgeneration units, we demonstrate the ability of our approach to solve realistic,†...

Kwok Cheung

2014-05-16T23:59:59.000Z

469

United Power- Business Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

United Power, in conjunction with wholesale power supplier Tri-State Generation and Transmission (TSGT), offers rebates for the installation of a variety of commercial energy efficient equipment...

470

Efficiency United (Gas)- Residential Efficiency Program  

Broader source: Energy.gov [DOE]

The Efficiency United program is intended to provide assistance and incentives to customers who employ energy efficient measures. Programs offer rebates on natural gas water heaters, clothes...

471

United States Geological Survey Geospatial Information Response  

E-Print Network [OSTI]

1 United States Geological Survey Geospatial Information Response Standard Operating Procedures May 20, 2013 Executive Summary The Geospatial, reporting requirements, and business processes for acquiring and providing geospatial

Torgersen, Christian

472

United States National Energy Technology Laboratory's (NETL)...  

Open Energy Info (EERE)

Laboratory's (NETL) Smart Grid Implementation Strategy Reference Library Website Jump to: navigation, search Tool Summary LAUNCH TOOL Name: United States National Energy Technology...

473

Problems of intraplate extensional tectonics, Western United...  

Open Energy Info (EERE)

on the Great Basin Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: Problems of intraplate extensional tectonics, Western United...

474

Optimization Online - Toward Scalable Stochastic Unit Commitment ...  

E-Print Network [OSTI]

May 16, 2014 ... ... in stochastic unit commitment, with application to real data associated with the Independent System Operator for New England (ISO-NE).

Yonghan Feng

2014-05-16T23:59:59.000Z

475

Portable brine evaporator unit, process, and system  

DOE Patents [OSTI]

The present invention discloses a comprehensive, efficient, and cost effective portable evaporator unit, method, and system for the treatment of brine. The evaporator unit, method, and system require a pretreatment process that removes heavy metals, crude oil, and other contaminates in preparation for the evaporator unit. The pretreatment and the evaporator unit, method, and system process metals and brine at the site where they are generated (the well site). Thus, saving significant money to producers who can avoid present and future increases in transportation costs.

Hart, Paul John (Indiana, PA); Miller, Bruce G. (State College, PA); Wincek, Ronald T. (State College, PA); Decker, Glenn E. (Bellefonte, PA); Johnson, David K. (Port Matilda, PA)

2009-04-07T23:59:59.000Z

476

Corporate Energy Management Process  

E-Print Network [OSTI]

. May 21-24, 2013 Corporate Energy Management Process 2 ?Brief introduction to BASF ? BASF Corporate Energy Management ? Management Support ? Goals ? Continuous Improvement ? Best Practices ? Recognition ?Summary ESL-IE-13-05-25 Proceedings...-value products ? Intelligent, sustainable system solutions ? 2012 Sales: ?72.1 Billion ? Employees: 110,000 Company overview BASF ? The Chemical Company ESL-IE-13-05-25 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA...

Geiger, T.

2013-01-01T23:59:59.000Z

477

Sustainable Energy Management Programs  

E-Print Network [OSTI]

Sustainable Energy Management Programs Steve Hanner Allen ISD/TEMA . ESL-KT-14-11-45 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 Starting an Energy Management Program ē Recognize need, Elicit District Commitment... ē Appoint Energy Manager ē Analyze Existing Conditions ē Develop Plan ē Implement and Monitor Program ESL-KT-14-11-45 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 Sustainable Programs Feature Ė District Commitment...

Hanner, S.

2014-01-01T23:59:59.000Z

478

International Entry Decision for Design Firms  

E-Print Network [OSTI]

Contractors TCE Transaction Cost Economics vii TABLE OF CONTENT Page ABSTRACT .......................................................................................................................ii DEDICATION... as ? Transaction Cost Economics Theory (TCE) ? International risk management ? Decision support system for international projects ? Organizational issues in global projects This research required an extensive literature review on global AEC projects as well...

Tohidi Vahdat, Amin

2013-11-22T23:59:59.000Z

479

Contemporary heart failure management.  

E-Print Network [OSTI]

??The research presented within this thesis aims to add to the current knowledge regarding contemporary heart failure (HF) management. Chapter 2 describes a study collatingÖ (more)

Wasywich, Cara Anne

2009-01-01T23:59:59.000Z

480

Water Management Act (Massachusetts)  

Broader source: Energy.gov [DOE]

This Act regulates and registers water withdrawals in the Commonwealth of Massachusetts to enable effective planning and management of water use and conservation. The Act establishes a Water...

Note: This page contains sample records for the topic "management unit tce" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Hazardous Wastes Management (Alabama)  

Broader source: Energy.gov [DOE]

This legislation gives regulatory authority to the Department of Environmental Management to monitor commercial sites for hazardous wastes; fees on waste received at such sites; hearings and...

482

Hazardous Waste Management (Indiana)  

Broader source: Energy.gov [DOE]

The state supports the implementation of source reduction, recycling, and other alternative solid waste management practices over incineration and land disposal. The Department of Environmental...

483

CONFIGURATION MANAGEMENT (CM)  

Broader source: Energy.gov (indexed) [DOE]

Safety systems and mission critical systems are defined and a comprehensive Configuration Management systemprocedure to maintain control over the design and modifications of these...

484

Total Light Management  

Broader source: Energy.gov [DOE]

Presentation covers total light management, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

485

Project Risk Management:.  

E-Print Network [OSTI]

?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore beÖ (more)

Koelmeyer, Chris

2013-01-01T23:59:59.000Z

486

Parallel integrated thermal management  

DOE Patents [OSTI]

Embodiments discussed herein are directed to managing the heat content of two vehicle subsystems through a single coolant loop having parallel branches for each subsystem.

Bennion, Kevin; Thornton, Matthew

2014-08-19T23:59:59.000Z

487

ISSUES MANAGEMENT PROGRAM MANUAL  

E-Print Network [OSTI]

LBNL/PUB-5519 (1), Rev. 032 ISSUES MANAGEMENT PROGRAM MANUAL LBNL/PUB-5519 (1), Rev.Berkeley National Laboratory LBNL/PUB-5519 (1), Rev. 0

Gravois, Melanie

2007-01-01T23:59:59.000Z

488

Groundwater Management Areas (Texas)  

Broader source: Energy.gov [DOE]

This legislation authorizes the Texas Commission on Environmental Quality and the Texas Water Development Board to establish Groundwater Management Areas to provide for the conservation,...

489

Watershed Management Policy (Minnesota)  

Broader source: Energy.gov [DOE]

It is state policy to manage groundwater and surface water resources from the perspective of aquifers, watersheds, and river basins to achieve protection, preservation, enhancement, and restoration...

490

Project Management Practices  

Energy Savers [EERE]

on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

491

INL's Environmental Management System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and minimize environmental impacts throughout the lifecycle of INL facilities and operations. Conduct all activities and manage hazardous and radioactive materials and...

492

Stormwater Management (North Carolina)  

Broader source: Energy.gov [DOE]

The rules in this Section set forth the requirements for application and issuance of permits for stormwater management systems. These requirements to control pollutants associated with stormwater...

493

Energy Management Systems  

E-Print Network [OSTI]

This presentation will address results from a pilot project with 10 chemical plants on energy management systems and the development of an energy efficiency plant certification program....

Ferland, K.

2007-01-01T23:59:59.000Z

494

Stormwater Management Act (Pennsylvania)  

Broader source: Energy.gov [DOE]

The policy and purpose of this act is to encourage planning and management of storm water runoff in each watershed consistent with sound water and land use practices.

495

Advisory Committee Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual provides detailed DOE requirements, responsibilities, processes, and procedures for the establishment, operation, and management of advisory committees. Cancels DOE M 510.1-1.

2007-10-22T23:59:59.000Z

496

Change Control Management Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide provides a suggested approach and uniform guidance for managing project and contract changes through applying the requirements of DOE O 413.3B. No cancellation.

2011-07-29T23:59:59.000Z

497

Hydro Capital Asset Manager  

Broader source: Energy.gov [DOE]

This position is located in Federal Hydro Projects, Generation Asset Management, Power Services. Additional vacancies may be filled through this vacancy announcement or if they become available.

498

Environmental Resource Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Resource Management This division delivers science-based engineering solutions to meet regional and national energy, water and other critical environmental...

499

Information Technology Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This revised Order is needed to clarify the roles and responsibilities, policies, and procedures for effectively managing IT investments to ensure mission success.

2013-11-21T23:59:59.000Z

500

Traffic Management Specialist  

Broader source: Energy.gov [DOE]

The incumbent in this position will serve as a Traffic Management Specialist for BPAs Transmission Business Line (TBL) and oversee commercial transportation services for the movement of materials...