National Library of Energy BETA

Sample records for management system policy

  1. Safety Management System Policy

    Energy Savers [EERE]

    Health, Safety and Security U.S. Department of Energy POLICY Washington, D.C. Approved: 4-25-11 SUBJECT: INTEGRATED SAFETY MANAGEMENT POLICY PURPOSE AND SCOPE To establish the Department of Energy's (DOE) expectation for safety, 1 including integrated safety management that will enable the Department's mission goals to be accomplished efficiently while ensuring safe operations at all departmental facilities and activities. This Policy cancels and supersedes DOE Policy (P) 411.1, Safety

  2. Safety Management System Policy

    Broader source: Energy.gov [DOE]

    Safety Management Systems provide a formal, organized process whereby people plan, perform, assess, and improve the safe conduct of work. The Safety Management System is institutionalized through...

  3. SES Performance Management System Policy and Operating Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Responsible Contacts Erin Moore Deputy Director, Office of Executive Resources E-mail Erin.Moore@hq.doe.gov Phone (202) 586-9558 More Documents & Publications POLICY MEMORANDUM 1 ...

  4. Integrated dynamic policy management methodology and system for strategic environmental assessment of golf course installation policy in Taiwan

    SciTech Connect (OSTI)

    Chen, Ching-Ho; Liu, Wei-Lin; Liaw, Shu-Liang

    2011-01-15

    Strategic environmental assessment (SEA) focuses primarily on assessing how policies, plans, and programs (PPPs) influence the sustainability of the involved regions. However, the processes of assessing policies and developing management strategies for pollution load and resource use are usually separate in the current SEA system. This study developed a policy management methodology to overcome the defects generated during the above processes. This work first devised a dynamic management framework using the methods of systems thinking, system dynamics, and Managing for Results (MFRs). Furthermore, a driving force-pressure-state-impact-response (DPSIR) indicator system was developed. The golf course installation policy was applied as a case study. Taiwan, counties of Taiwan, and the golf courses within those individual counties were identified as a system, subsystems, and objects, respectively. This study identified an object-linked double-layer framework with multi-stage-option to simultaneously to quantify golf courses in each subsystem and determine ratios of abatement and allocation for pollution load and resource use of each golf course. The DPSIR indicator values for each item of each golf course in each subsystem are calculated based on the options taken in the two decision layers. The summation of indicator values for all items of all golf courses in all subsystems according to various options is defined as the sustainability value of the policy. An optimization model and a system (IDPMS) were developed to obtain the greatest sustainability value of the policy, while golf course quantity, human activity intensity, total quantities of pollution load and resource use are simultaneously obtained. The solution method based on enumeration of multiple bounds for objectives and constraints (EMBOC) was developed for the problem with 1.95 x 10{sup 128} combinations of possible options to solve the optimal solution in ten minutes using a personal computer with 3.0 GHz CPU. This study obtain the policy with the optimal environmental sustainability value in Taiwan is 102 golf courses. Human activity intensity and total quantities of pollution load and resource use which are concurrently obtained are less than those of the existing policy and the existing quantities in 2006. The optimal solution remains unchanged under most sensitivity analysis conditions, unless the weights and constraints are extremely changed. The analytical results indicate that the proposed methodology can be used to assist the authorities for simultaneously generating and assessing the policy during the SEA process.

  5. Cyber-Intrusion Auto-Response Policy and Management System (CAPMS)

    Office of Environmental Management (EM)

    Cyber-Intrusion Auto-Response Policy and Management System (CAPMS) A managed security system that integrates advanced cybersecurity algorithms with energy delivery systems to respond autonomously to cyber intrusions while sustaining critical energy delivery functions Background Cyber attacks are becoming more sophisticated every day. Electric utilities are faced with the challenge of detecting, analyzing, and responding to cyber incidents to protect public safety and preserve the integrity of

  6. Design an optimum safety policy for personnel safety management - A system dynamic approach

    SciTech Connect (OSTI)

    Balaji, P.

    2014-10-06

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.

  7. Improving energy efficiency via smart building energy management systems. A comparison with policy measures

    SciTech Connect (OSTI)

    Rocha, Paula; Siddiqui, Afzal; Stadler, Michael

    2014-12-09

    In this study, to foster the transition to more sustainable energy systems, policymakers have been approving measures to improve energy efficiency as well as promoting smart grids. In this setting, building managers are encouraged to adapt their energy operations to real-time market and weather conditions. Yet, most fail to do so as they rely on conventional building energy management systems (BEMS) that have static temperature set points for heating and cooling equipment. In this paper, we investigate how effective policy measures are at improving building-level energy efficiency compared to a smart BEMS with dynamic temperature set points. To this end, we present an integrated optimisation model mimicking the smart BEMS that combines decisions on heating and cooling systems operations with decisions on energy sourcing. Using data from an Austrian and a Spanish building, we find that the smart BEMS results in greater reduction in energy consumption than a conventional BEMS with policy measures.

  8. Aligning National Environmental Policy Act Process with Environmental Management Systems (CEQ, 2007)

    Broader source: Energy.gov [DOE]

    Aligning National Environmental Policy Act Process with Environmental Management Systems (EMS) is a guidebook for NEPA and EMS practitioners that identifies elements of an EMS that can improve NEPA implementation. Alignment of NEPA and EMS further enhances both NEPA's goals and the sustainability goals laid out in the Executive Order 13423: " to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling the social, economic, and other requirements of the present and future generations of Americans."

  9. Integrated Safety Management Policy

    Energy Savers [EERE]

    INTEGRATED SAFETY MANAGEMENT SYSTEM DESCRIPTION U.S. DEPARTMENT OF ENERGY Office of Environmental Management Headquarters May 2008 Preparation: Braj K. sin& Occupational Safety and Health Manager Office of Safety Management Concurrence: Chuan-Fu wu Director, Offlce of Safety Management Deputy Assistant Secretary for safe& Management andoperations Operations Officer for 1 Environmental Management Approval: Date p/-g Date Environmental Management TABLE OF CONTENTS

  10. Data Management Policy The

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management Policy The guidelines below describe Data Management procedures, processes and resources that need to be understood by both user projects and in-house research. 1. Limited data management resources. The CNMS has limited data storage resources and storage capacity varies depending upon the instruments used. User data stored at CNMS will only be retained up to three months past the termination date of a user project. There is no lifetime retention. Users are expected to migrate their

  11. Integrated Safety Management Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The policy establishes DOE's expectation for safety, including integrated safety management that will enable the Department’s mission goals to be accomplished efficiently while ensuring safe operations at all departmental facilities and activities. Supersedes DOE P 450.4, DOE P 411.1, DOE P 441.1, DOE P 450.2A, and DOE P 450.7

  12. Improving energy efficiency via smart building energy management systems. A comparison with policy measures

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Rocha, Paula; Siddiqui, Afzal; Stadler, Michael

    2014-12-09

    In this study, to foster the transition to more sustainable energy systems, policymakers have been approving measures to improve energy efficiency as well as promoting smart grids. In this setting, building managers are encouraged to adapt their energy operations to real-time market and weather conditions. Yet, most fail to do so as they rely on conventional building energy management systems (BEMS) that have static temperature set points for heating and cooling equipment. In this paper, we investigate how effective policy measures are at improving building-level energy efficiency compared to a smart BEMS with dynamic temperature set points. To this end,more » we present an integrated optimisation model mimicking the smart BEMS that combines decisions on heating and cooling systems operations with decisions on energy sourcing. Using data from an Austrian and a Spanish building, we find that the smart BEMS results in greater reduction in energy consumption than a conventional BEMS with policy measures.« less

  13. Departmental Cyber Security Management Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-05-08

    The Departmental Cyber Security Management (DCSM) Policy was developed to further clarify and support the elements of the Integrated Safeguards and Security Management (ISSM) Policy regarding cyber security. Certified 9-23-10. No cancellation.

  14. Project Management Policies & Principles Memo

    Broader source: Energy.gov [DOE]

    Memo enhances and clarifies departmental policy related to project management as a result of the Improving Project Management Study and subsequent Secretarial Memo dated December 2014.

  15. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-11-02

    The Order establishes policy and assigns roles and responsibilities for the Department of Energy (DOE) Emergency Management System. Supersedes DOE O 151.1B.

  16. Integrated Safety Management Policy - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P 450.4A, Integrated Safety Management Policy by David Weitzman Functional areas: Integrated Safety Management, Safety The policy establishes DOE's expectation for safety,...

  17. NPS Management Policies 2006 | Open Energy Information

    Open Energy Info (EERE)

    Management Policies 2006 Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: NPS Management Policies 2006Permitting...

  18. Business System Clause - Berta Schreiber, Dir, Office of Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) 2014 DOE Project Management Workshop ...

  19. Integrated Safeguards and Security Management (ISSM) Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-05-08

    The purpose of this Policy is to formalize an Integrated Safeguards and Security Management (ISSM) framework. Safeguards and security management systems provide a formal, organized process for planning, performing, assessing, and improving the secure conduct of work in accordance with risk-based protection strategies. These systems are institutionalized through Department of Energy (DOE) directives and contracts. Does not cancel other directives. Canceled by DOE P 470.1A.

  20. Request to Cancel DOE Policy 111.1, Departmental Organization Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-08-06

    This Policy reiterates the authorities given to the Secretary to re-organize the Department and re-delegate those same authorities to Head of Departmental Elements, as appropriate, as found in the Department of Energy Organization Act, P.L. 95-91, 42 U.S.C. 7101.

  1. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-11-01

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. The Emergency Management System provides the framework for development, coordination, control, and direction of all emergency planning, preparedness, readiness assurance, response, and recovery actions. Canceled by DOE O 151.1B. Cancels DOE O 151.1.

  2. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-08-21

    The Order establishes policy and assigns and describes roles and responsibilities for the DOE Emergency Management System. Cancels DOE 5500.1B, DOE 5500.2B, DOE 5500.3A, DOE 5500.4A, 5500.5A,5500.7B, 5500.8A, 5500.9A, DOE 5500.10

  3. Comprehensive Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-29

    To establish policy and to assign and describe roles and responsibilities for the Department of Energy (DOE) Emergency Management System. (This is an administrative change to DOE O 151.1A). Canceled by DOE O 151.1C. Cancels DOE O 151.1A.

  4. POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS...

    Energy Savers [EERE]

    POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING...

  5. Policy Flash: 2013-52 Contractor Legal Management Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Questions concerning this policy...

  6. Uranium Management and Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Uranium Management and Policy Uranium Management and Policy The Paducah Gaseous Diffusion Plant is located 3 miles south of the Ohio River and is 12 miles west of Paducah, Kentucky. Paducah remains the only operating gaseous diffusion uranium enrichment plant in the United States. The Paducah Gaseous Diffusion Plant is located 3 miles south of the Ohio River and is 12 miles west of Paducah, Kentucky. Paducah remains the only operating gaseous diffusion uranium enrichment plant in the United

  7. Emergency Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-25

    The order establishes policy, and assigns and describes roles and responsibilities for the DOE Emergency Management System. DOE 5500.1B Chg 1; DOE 5500.2B Chg 1; DOE 5500.3A Chg 1; DOE 5500.4A; DOE 5500.5A; DOE 5500.7B; DOE 5500.8A; DOE 5500.9A, and DOE 5500.10A Chg 1. Canceled by DOE O 151.1A.

  8. Appendix B Ground Water Management Policy

    Office of Legacy Management (LM)

    Ground Water Management Policy for the Monticello Mill Tailings Site and Adjacent Areas This page intentionally left blank Docun~ent Number Q0029500 Appendix B State of Utah DEPARTblENT OF NATURAL RESOURCES DIVISION OF WATER RIGHTS Ground-Water Management Policy for the Mot~ticello Mill Tailings Site and Adjacent Areas The Monticello Mill Tailings Site is on the southeast portion of the tovm of Monticello in Sectton 36, T33S, K23E and Section 31, i33S. R24E, SLB&M. The mill site was used

  9. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System (EMS) is a set of processes and practices that enable an organization to reduce its...

  10. EARNED VALUE MANAGEMENT SYSTEM

    Office of Environmental Management (EM)

    EARNED VALUE MANAGEMENT SYSTEM INTERPRETATION HANDBOOK (EVMSIH) Office of Project Management Oversight and Assessments (PMOA) U.S. Department of Energy Washington, DC September 30, 2015 1 Table of Contents TABLE OF FIGURES 4 FOREWORD 5 INTRODUCTION 6 1.1 PURPOSE OF EVMSIH 6 1.2 EVM POLICY 6 1.4 CONTENT AND FORMAT OF THE EVMSIH 8 1.5 GENERAL TOPICS TO UNDERSTAND GUIDELINE INTENT 10 SECTION 2.0 ORGANIZATION (GUIDELINES 1-5) 12 Guideline 1 - Define the WBS 13 Guideline 2 - Define the Project OBS 22

  11. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

  12. Policy Flash: 2013-52 Contractor Legal Management Requirements...

    Energy Savers [EERE]

    Legal Management Requirements.pdf More Documents & Publications POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS...

  13. NNSA Policy System | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Policy System | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog

  14. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System (EMS) is a set of processes and practices that enable an organization to reduce its environmental impacts and increase its operating efficiency.. August 1, 2013 Environmental Management System at LANL Environmental Management System at LANL View larger image »

  15. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM

  16. Project Management Policy & Guidance Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy & Guidance Documents Project Management Policy & Guidance Documents << Return to Directives & Documents | Proceed to Publications & Documents >> Document Type Function

  17. POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operating (Non-M&O) Contractor Business Systems Clauses for Section H - Earned Value Management Clause | Department of Energy 7 Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H - Earned Value Management Clause POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H - Earned Value Management Clause Questions

  18. POLICY GUIDANCE MEMORANDUM #16 OPM Managers' Satisfaction Survey |

    Energy Savers [EERE]

    Department of Energy 6 OPM Managers' Satisfaction Survey POLICY GUIDANCE MEMORANDUM #16 OPM Managers' Satisfaction Survey This memorandum provides guidance on how to implement the requirement for hiring managers to complete the OPM Managers' Satisfaction Survey before Servicing Human Resources Offices (SHROs) can make an official offer to any job selectee. PDF icon POLICY GUIDANCE MEMORANDUM #16 OPM Managers' Satisfaction Survey Responsible Contacts Jennifer Ackerman Director, Human Capital

  19. Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) 2014 DOE Project Management Workshop PDF icon Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) More Documents & Publications Agenda Agenda_2015 APM Workshop_Final POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for

  20. BPA revises policy for managing seasonal power oversupply

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    policy-for-managing-seasonal-power-oversupply Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects...

  1. Federal Land Policy and Management Act of 1976 (FLPMA) | Open...

    Open Energy Info (EERE)

    Legal Document- Federal RegulationFederal Regulation: Federal Land Policy and Management Act of 1976 (FLPMA)Legal Abstract FLPMA, also called the BLM Organic Act,...

  2. Policy Analysis System (Polysys) | Open Energy Information

    Open Energy Info (EERE)

    polysys.html OpenEI Keyword(s): EERE tool, Policy Analysis System, Polysys Language: English References: Agricultural Policy Analysis Center Research Tools1 Model U.S....

  3. Social Impact Management Plans: Innovation in corporate and public policy

    SciTech Connect (OSTI)

    Franks, Daniel M.; Vanclay, Frank

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community. • SIMPs link assessment to ongoing management and address social and community issues. • SIMPs clarify responsibilities in the management of impacts, opportunities and risks. • SIMPs demonstrate a shift to include management as a core component of SIA practice.

  4. System Management Software

    Energy Science and Technology Software Center (OSTI)

    2013-02-22

    MacPatch is Mac OS X system management software solution. It's used for patching, software distribution and inventory.

  5. emergency management systems

    National Nuclear Security Administration (NNSA)

    9%2A en Building International Emergency Management Systems http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorisminternationalprograms-1

  6. Information System Security Manager (ISSM) | Department of Energy

    Office of Environmental Management (EM)

    Manager (ISSM) Information System Security Manager (ISSM) macbook-925595_960_720.jpg The Information Security System Manager (ISSM) is designated by an operating unit's (DOE organization or site) Senior Manager to manage the unit's cyber security program. The ISSM establishes, documents, and monitors an operating unit's cyber security program implementation plan, and ensures compliance with DOE management policies. Candidates must possess a working knowledge of cyber security policies and

  7. Integrated Safety Management System Guide (Volume 1) for use with Safety Management System Policies (DOE P 450.4, DOE P 450.5, and DOE P 450.6); The Functions, Responsibilities, and Authorities Manual; and DOE Acquisition Regulation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-01

    This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and the National Nuclear Security Administration (NNSA). This Guide is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1C.

  8. Integrated Safety Management System Guide (Volume 1) for use with Safety Management System Policies (DOE P 450.4, DOE P 450.5, and DOE P 450.6); The Functions, Responsibilities, and Authorities Manual; and DOE Acquisition Regulation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-01

    This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and the National Nuclear Security Administration (NNSA). This Guide is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Replaces DOE G 450.4-1A. Canceled by DOE G 450.4-1C.

  9. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous...

  10. Fifty years of federal radioactive waste management: Policies and practices

    SciTech Connect (OSTI)

    Bradley, R.G.

    1997-04-01

    This report provides a chronological history of policies and practices relating to the management of radioactive waste for which the US Atomic Energy Commission and its successor agencies, the Energy Research and Development Administration and the Department of Energy, have been responsible since the enactment of the Atomic Energy Act in 1946. The defense programs and capabilities that the Commission inherited in 1947 are briefly described. The Commission undertook a dramatic expansion nationwide of its physical facilities and program capabilities over the five years beginning in 1947. While the nuclear defense activities continued to be a major portion of the Atomic Energy Commission`s program, there was added in 1955 the Atoms for Peace program that spawned a multiplicity of peaceful use applications for nuclear energy, e.g., the civilian nuclear power program and its associated nuclear fuel cycle; a variety of industrial applications; and medical research, diagnostic, and therapeutic applications. All of these nuclear programs and activities generated large volumes of radioactive waste that had to be managed in a manner that was safe for the workers, the public, and the environment. The management of these materials, which varied significantly in their physical, chemical, and radiological characteristics, involved to varying degrees the following phases of the waste management system life cycle: waste characterization, storage, treatment, and disposal, with appropriate transportation linkages. One of the benefits of reviewing the history of the waste management program policies and practices if the opportunity it provides for identifying the lessons learned over the years. Examples are summarized at the end of the report and are listed in no particular order of importance.

  11. Workplace Charging Management Policies Webinar | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Learn about effective workplace charging policies and procedures in the areas of administration, registration and liability, pricing and sharing. Read the text version. PDF icon Workplace Charging Management Policies Presentation More Documents & Publications Workplace Charging Challenge Summit 2014: Session 2, Track B Workplace Charging Presentation Workplace Charging Challenge Employer Workshop Best Practices Webinar Workplace Charging Challenge Employer Workshop Best Practices Webinar

  12. Federal Land Policy and Management Act of 1976 | Open Energy...

    Open Energy Info (EERE)

    from the Secretary of the Interior to the Director of the BLM, including oversight of oil and gas leases. References Federal Land Policy and Management Act of 19761 The...

  13. DOE Announces Policy for Managing Excess Uranium Inventory

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today released a Policy Statement on the management of the Department of Energy's (DOE) excess uranium inventory, providing the framework...

  14. Item Management Control System

    Energy Science and Technology Software Center (OSTI)

    1993-08-06

    The Item Management Control System (IMCS) has been developed at Idaho National Engineering Laboratory to assist in organizing collections of documents using an IBM-PC or similar DOS system platform.

  15. Metadata management staging system

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    Django application providing a user-interface for building a file and metadata management system. An evolution of our Node.js and CouchDb metadata management system. This one focuses on server functionality and uses a well-documented, rational and REST-ful API for data access.

  16. Lithium battery management system

    DOE Patents [OSTI]

    Dougherty, Thomas J. (Waukesha, WI)

    2012-05-08

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  17. Policy enabled information sharing system

    DOE Patents [OSTI]

    Jorgensen, Craig R.; Nelson, Brian D.; Ratheal, Steve W.

    2014-09-02

    A technique for dynamically sharing information includes executing a sharing policy indicating when to share a data object responsive to the occurrence of an event. The data object is created by formatting a data file to be shared with a receiving entity. The data object includes a file data portion and a sharing metadata portion. The data object is encrypted and then automatically transmitted to the receiving entity upon occurrence of the event. The sharing metadata portion includes metadata characterizing the data file and referenced in connection with the sharing policy to determine when to automatically transmit the data object to the receiving entity.

  18. Radiation Exposure Monitoring Systems Program Policy for Submitting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Policy for Submitting of PII information Radiation Exposure Monitoring Systems ... Guide. PDF icon Radiation Exposure Monitoring Systems Program Policy for Submitting ...

  19. Oil field management system

    DOE Patents [OSTI]

    Fincke, James R.

    2003-09-23

    Oil field management systems and methods for managing operation of one or more wells producing a high void fraction multiphase flow. The system includes a differential pressure flow meter which samples pressure readings at various points of interest throughout the system and uses pressure differentials derived from the pressure readings to determine gas and liquid phase mass flow rates of the high void fraction multiphase flow. One or both of the gas and liquid phase mass flow rates are then compared with predetermined criteria. In the event such mass flow rates satisfy the predetermined criteria, a well control system implements a correlating adjustment action respecting the multiphase flow. In this way, various parameters regarding the high void fraction multiphase flow are used as control inputs to the well control system and thus facilitate management of well operations.

  20. Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acknowledge NERSC Allocation Eligibility Allocation Management Computer Security Computer Use Data Management Passwords Queue Scheduling Usage Charges System Outages Service...

  1. Purge water management system

    DOE Patents [OSTI]

    Cardoso-Neto, J.E.; Williams, D.W.

    1995-01-01

    A purge water management system is described for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

  2. Purge water management system

    DOE Patents [OSTI]

    Cardoso-Neto, Joao E.; Williams, Daniel W.

    1996-01-01

    A purge water management system for effectively eliminating the production of purge water when obtaining a groundwater sample from a monitoring well. In its preferred embodiment, the purge water management system comprises an expandable container, a transportation system, and a return system. The purge water management system is connected to a wellhead sampling configuration, typically permanently installed at the well site. A pump, positioned with the monitoring well, pumps groundwater through the transportation system into the expandable container, which expands in direct proportion with volume of groundwater introduced, usually three or four well volumes, yet prevents the groundwater from coming into contact with the oxygen in the air. After this quantity of groundwater has been removed from the well, a sample is taken from a sampling port, after which the groundwater in the expandable container can be returned to the monitoring well through the return system. The purge water management system prevents the purge water from coming in contact with the outside environment, especially oxygen, which might cause the constituents of the groundwater to oxidize. Therefore, by introducing the purge water back into the monitoring well, the necessity of dealing with the purge water as a hazardous waste under the Resource Conservation and Recovery Act is eliminated.

  3. Computer memory management system

    DOE Patents [OSTI]

    Kirk, III, Whitson John

    2002-01-01

    A computer memory management system utilizing a memory structure system of "intelligent" pointers in which information related to the use status of the memory structure is designed into the pointer. Through this pointer system, The present invention provides essentially automatic memory management (often referred to as garbage collection) by allowing relationships between objects to have definite memory management behavior by use of coding protocol which describes when relationships should be maintained and when the relationships should be broken. In one aspect, the present invention system allows automatic breaking of strong links to facilitate object garbage collection, coupled with relationship adjectives which define deletion of associated objects. In another aspect, The present invention includes simple-to-use infinite undo/redo functionality in that it has the capability, through a simple function call, to undo all of the changes made to a data model since the previous `valid state` was noted.

  4. Integrated Safety Management System Phase I Verification for the Plutonium Finishing Plant (PFP) [VOL 1 & 2

    SciTech Connect (OSTI)

    SETH, S.S.

    2000-01-10

    U.S. Department of Energy (DOE) Policy 450.4, Safety Management System Policy commits to institutionalizing an Integrated Safety Management System (ISMS) throughout the DOE complex as a means of accomplishing its missions safely. DOE Acquisition Regulation 970.5204-2 requires that contractors manage and perform work in accordance with a documented safety management system.

  5. Strategies for the municipal waste management system to take advantage of carbon trading under competing policies: The role of energy from waste in Sydney

    SciTech Connect (OSTI)

    El Hanandeh, Ali El-Zein, Abbas

    2009-07-15

    Climate change is a driving force behind some recent environmental legislation around the world. Greenhouse gas emission reduction targets have been set in many industrialised countries. A change in current practices of almost all greenhouse-emitting industrial sectors is unavoidable, if the set targets is to be achieved. Although, waste disposal contributes around 3% of the total greenhouse gas emissions in Australia (mainly due to fugitive methane emissions from landfills), the carbon credit and trading scheme set to start in 2010 presents significant challenges and opportunities to municipal solid waste practitioners. Technological advances in waste management, if adopted properly, allow the municipal solid waste sector to act as carbon sink, hence earning tradable carbon credits. However, due to the complexity of the system and its inherent uncertainties, optimizing it for carbon credits may worsen its performance under other criteria. We use an integrated, stochastic multi-criteria decision-making tool that we developed earlier to analyse the carbon credit potential of Sydney municipal solid waste under eleven possible future strategies. We find that the changing legislative environment is likely to make current practices highly non-optimal and increase pressures for a change of waste management strategy.

  6. Management control system description

    SciTech Connect (OSTI)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  7. POLICY FLASH 2013-55 FPDS-NG Change Management Notice for the Oklahoma

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tornado and Storm | Department of Energy POLICY FLASH 2013-55 FPDS-NG Change Management Notice for the Oklahoma Tornado and Storm POLICY FLASH 2013-55 FPDS-NG Change Management Notice for the Oklahoma Tornado and Storm This Flash will be available online at the following website: http://energy.gov/management/office-management/operational-management/procurement-and-acquisition/policy-flashes Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and

  8. Analytical Services Management System

    Energy Science and Technology Software Center (OSTI)

    2005-03-30

    Analytical Services Management System (ASMS) provides sample management services. Sample management includes sample planning for analytical requests, sample tracking for shipping and receiving by the laboratory, receipt of the analytical data deliverable, processing the deliverable and payment of the laboratory conducting the analyses. ASMS is a web based application that provides the ability to manage these activities at multiple locations for different customers. ASMS provides for the assignment of single to multiple samples for standardmore »chemical and radiochemical analyses. ASMS is a flexible system which allows the users to request analyses by line item code. Line item codes are selected based on the Basic Ordering Agreement (BOA) format for contracting with participating laboratories. ASMS also allows contracting with non-BOA laboratories using a similar line item code contracting format for their services. ASMS allows sample and analysis tracking from sample planning and collection in the field through sample shipment, laboratory sample receipt, laboratory analysis and submittal of the requested analyses, electronic data transfer, and payment of the laboratories for the completed analyses. The software when in operation contains business sensitive material that is used as a principal portion of the Kaiser Analytical Management Services business model. The software version provided is the most recent version, however the copy of the application does not contain business sensitive data from the associated Oracle tables such as contract information or price per line item code.« less

  9. Power management system

    DOE Patents [OSTI]

    Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Akasam, Sivaprasad (Peoria, IL); Hoff, Brian D. (East Peoria, IL)

    2007-10-02

    A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

  10. Chemical Management System

    Energy Science and Technology Software Center (OSTI)

    1998-10-30

    CMS provides an inventory of all chemicals on order or being held in the laboratory, to provide a specific location for all chemical containers, to ensure that health and safety regulatory codes are being upheld, and to provide PNNL staff with hazardous chemical information to better manage their inventories. CMS is comprised of five major modules: 1) chemical purchasing, 2) chemical inventory, 3) chemical names, properties, and hazard groups, 4) reporting, and 5) system administration.

  11. Policy Flash 2013-47 Management and Security of Personally Identifiable

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information | Department of Energy 7 Management and Security of Personally Identifiable Information Policy Flash 2013-47 Management and Security of Personally Identifiable Information Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov, or at (202) 287-1614. PDF icon Policy Flash 2013-47 Management and Security of Personally Identifiable Information.pdf PDF icon Attch_Management and

  12. Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrative Change | Department of Energy 0 DOE Order 412.1a, Work Authorization System Administrative Change Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System Administrative Change Questions concerning this policy flash should be directed to Mike Dombrowski, of the Office of Acquisition and Project Management Policy at 202-287-1828 or at michael.dombrowski@hq.doe.gov. PDF icon POLICY_FLASH_Work Authorization System Admin Chg.pdf PDF icon o412 1A_AdminChg11.pdf More

  13. POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FINAL RULE TO EXISTING CONTRACTS | Department of Energy 6 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at

  14. Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are in .pdf format) After Hours Access Policy Booking and Login Policy Cleanroom Policy Equipment Use Policy Two-Person Rule Cleanroom Chemical List Experimental Hall Policy...

  15. Radiation Exposure Monitoring Systems Program Policy for Submitting of PII

    Energy Savers [EERE]

    information | Department of Energy Exposure Monitoring Systems Program Policy for Submitting of PII information Radiation Exposure Monitoring Systems Program Policy for Submitting of PII information ‎December 17, ‎2015 The REMS Program Policy for submitting of PII information in accordance with the Office of Environment, Health, Safety and Security (EHSS) under DOE Order 231.1B and the REMS Reporting Guide. PDF icon Radiation Exposure Monitoring Systems Program Policy for Submitting of

  16. Cryptographic Key Management System

    SciTech Connect (OSTI)

    No, author

    2014-02-21

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene#12;ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

  17. Computerized training management system

    DOE Patents [OSTI]

    Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

    1998-08-04

    A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

  18. Computerized training management system

    DOE Patents [OSTI]

    Rice, Harold B. (Franklin Furnace, OH); McNair, Robert C. (East Setauket, NY); White, Kenneth (Shirley, NY); Maugeri, Terry (Wading River, NY)

    1998-08-04

    A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

  19. Regulations, Policies and Strategies for LLRW Management in Bangladesh - 12368

    SciTech Connect (OSTI)

    Mollah, A.S.

    2012-07-01

    Low level radioactive waste (LLW) is generated from various nuclear applications in Bangladesh. The major sources of radioactive waste in the country are at present: (a) the 3 MW TRIGA Mark-II research reactor; (b) the radioisotope production facility; (c) the medical, industrial and research facilities that use radionuclides; and (d) the industrial facility for processing monazite sands. Radioactive waste needs to be safely managed because it is potentially hazardous to human health and the environment. According to Nuclear Safety and Radiation Control Act-93, the Bangladesh Atomic Energy Commission (BAEC) is the governmental body responsible for the receipt and final disposal of radioactive wastes in the whole country. Waste management policy has become an important environmental, social, and economical issue for LLW in Bangladesh. Policy and strategies will serve as a basic guide for radioactive waste management in Bangladesh. The waste generator is responsible for on-site collection, conditioning and temporary storage of the waste arising from his practice. The Central Waste Processing and Storage Unit (CWPSU) of BAEC is the designated national facility with the requisite facility for the treatment, conditioning and storage of radioactive waste until a final disposal facility is established and becomes operational. The Regulatory Authority is responsible for the enforcement of compliance with provisions of the waste management regulation and other relevant requirements by the waste generator and the CWPSU. The objective of this paper is to present, in a concise form, basic information about the radioactive waste management infrastructure, regulations, policies and strategies including the total inventory of low level radioactive waste in the country. For improvement and strengthening in terms of operational capability, safety and security of RW including spent radioactive sources and overall security of the facility (CWPSF), the facility is expected to serve waste management need in the country and, in the course of time, the facility may be turned into a regional level training centre. It is essential for safe conduction and culture of research and application in nuclear science and technology maintaining the relevant safety of man and environment and future generations to come. (authors)

  20. Pareto Efficient Policy for Supervisory Power Management Control

    SciTech Connect (OSTI)

    Malikopoulos, Andreas

    2015-01-01

    n this paper we address the problem of online optimization of the supervisory power management control in parallel hybrid electric vehicles (HEVs). We model HEV opera- tion as a controlled Markov chain using the long-run expected average cost per unit time criterion, and we show that the control policy yielding the Pareto optimal solution minimizes the average cost criterion online. The effectiveness of the proposed solution is validated through simulation and compared to the solution derived with dynamic programming using the average cost criterion.

  1. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-05-06

    The Guide supports the Departments initiatives to improve program, project, and contract management through the implementation and surveillance of contractors earned value management systems. Canceled by DOE G 413.3-10A.

  2. Integrated Management Tracking System

    Energy Science and Technology Software Center (OSTI)

    2000-03-30

    The Integrated Management Tracking System (IMTS) is a "Web Enabled" Client/Server Business application that provides for the Identification and Resolution of commitments, situations, events and problems. The IMTS engine is written with Microsoft Active Server Pages (ASP) for IIS4. The system provides for reporting, entering, editing, closing and administration over a Intranet, Extranet or Internet. This Application facilitates: Electronic assignment, acceptance and tracking to completion. Email notifications of assigned action. Establishment of Due Dates. Electronicmore » search and retrieval based on keywords in combination with user specified database parameters (Document Type, Date Ranges, etc.). Coded for Trending and Reporting. User selected reports. Various levels of access for reports and administration. The "Server" side of this application consists of a Microsoft Access database running on a NT Server with Internet Information Server (IIS). As the "Client" side of the application runs on any Web browser, this solution is a cost effective, user friendly application that lends itself to organizations not physically colocated in one location providing information immediately available to everyone at once.« less

  3. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-13

    To support DOE's initiatives to improve program, project, and contract management through the implementation and surveillance of a contractor's Earned Value Management System (EVMS) that is in conformance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the American National Standards Institute/Electronic Industries Alliance (ANSI/EIA)-748-B, Earned Value Management System (or as required by contract), and Federal Acquisition Regulation (FAR) 52.234-4, Earned Value Management System (EVMS). Admin Chg 1 dated 10-22-2015.

  4. BLM - Federal Land Policy and Management Act of 1976 | Open Energy...

    Open Energy Info (EERE)

    Federal Land Policy and Management Act of 1976 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: BLM - Federal Land Policy and...

  5. PNNL: About - Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EMS Graphic The purpose of the Environmental Management System is to achieve and demonstrate environmental excellence by assessing and controlling the impact of Laboratory...

  6. System for Award Management (SAM):

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today...

  7. Earned Value Management System (EVMS)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-03-13

    This Guide provides approaches for implementing the Earned Value Management System (EVMS) requirements of DOE O 413.3B. Supersedes DOE G 413.3-10.

  8. DOE Policy 141.1: Management of Cultural Resources | Department of Energy

    Office of Environmental Management (EM)

    Policy 141.1: Management of Cultural Resources DOE Policy 141.1: Management of Cultural Resources The purpose of DOE Policy 141.1 is to ensure that Department of Energy (DOE) programs and field elements integrate cultural resources management into their missions and activities and to raise the level of awareness and accountability among DOE contractors concerning the importance of the Department's cultural resource-related legal and trust responsibilities. Download Document PDF icon DOE

  9. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Stecher, Thomas Elliot; Seeley, Charles Erklin; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Utturkar, Yogen Vishwas; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2015-08-25

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  10. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Stecher, Thomas Elliot; Seeley, Charles Erklin; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Utturkar, Yogen Vishwas; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2015-02-24

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  11. Lighting system with thermal management system

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  12. M-16-02, Category Management Policy 15-1: Improving the Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... principle and an important component of this policy. All category management strategies baseline small business use and set goals to meet or exceed that baseline participation. ...

  13. Policy-Based Resource Management for Next-Generation Internet Applications

    SciTech Connect (OSTI)

    Dr Carl Kesselman

    2002-08-16

    OAK 270- Project goal: provide a resource management architecture to support the specifications and consulation of resource owner and consumer policies

  14. Fuel cell gas management system

    DOE Patents [OSTI]

    DuBose, Ronald Arthur (Marietta, GA)

    2000-01-11

    A fuel cell gas management system including a cathode humidification system for transferring latent and sensible heat from an exhaust stream to the cathode inlet stream of the fuel cell; an anode humidity retention system for maintaining the total enthalpy of the anode stream exiting the fuel cell equal to the total enthalpy of the anode inlet stream; and a cooling water management system having segregated deionized water and cooling water loops interconnected by means of a brazed plate heat exchanger.

  15. Office of Energy Policy and Systems Analysis | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages

    Policy and Systems Analysis Search Search form Search Office of Energy Policy and Systems Analysis Office of Energy Policy and Systems Analysis Services Initiatives Initiatives Home Accelerate Energy Productivity 2030 Climate Action Champions Climate Vulnerability Report Critical Materials Strategy eGallon Energy Investment Partnerships Energy-Water Nexus Natural Gas Infrastructure Modernization Natural Gas Modernization Clearinghouse The Quadrennial Energy Review (QER) Partnership for Energy

  16. Office of Energy Policy and Systems Analysis Site Upgrade

    Broader source: Energy.gov [DOE]

    Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

  17. Policy Analysis Modeling System (PAMS) | Open Energy Information

    Open Energy Info (EERE)

    TOOL Name: Policy Analysis Modeling System AgencyCompany Organization: Lawrence Berkeley National Laboratory Sector: Energy Focus Area: Buildings, Energy Efficiency Topics:...

  18. POLICY MEMORANDUM #1 Policy and Operating Procedures for Senior Executive

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Service (SES) Performance Management System | Department of Energy MEMORANDUM #1 Policy and Operating Procedures for Senior Executive Service (SES) Performance Management System POLICY MEMORANDUM #1 Policy and Operating Procedures for Senior Executive Service (SES) Performance Management System PDF icon Policy Memo #1-SES Performance Policy and Operating Procedures Responsible Contacts Erin Moore Deputy Director, Office of Executive Resources E-mail Erin.Moore@hq.doe.gov Phone (202) 586-9558

  19. DE-FG02-04ER25606 Identity Federation and Policy Management Guide: Final Report

    SciTech Connect (OSTI)

    Humphrey, Marty, A

    2011-05-25

    The goal of this 3-year project was to facilitate a more productive dynamic matching between resource providers and resource consumers in Grid environments by explicitly specifying policies. There were broadly two problems being addressed by this project. First, there was a lack of an Open Grid Services Architecture (OGSA)-compliant mechanism for expressing, storing and retrieving user policies and Virtual Organization (VO) policies. Second, there was a lack of tools to resolve and enforce policies in the Open Services Grid Architecture. To address these problems, our overall approach in this project was to make all policies explicit (e.g., virtual organization policies, resource provider policies, resource consumer policies), thereby facilitating policy matching and policy negotiation. Policies defined on a per-user basis were created, held, and updated in MyPolMan, thereby providing a Grid user to centralize (where appropriate) and manage his/her policies. Organizationally, the corresponding service was VOPolMan, in which the policies of the Virtual Organization are expressed, managed, and dynamically consulted. Overall, we successfully defined, prototyped, and evaluated policy-based resource management and access control for OGSA-based Grids. This DOE project partially supported 17 peer-reviewed publications on a number of different topics: General security for Grids, credential management, Web services/OGSA/OGSI, policy-based grid authorization (for remote execution and for access to information), policy-directed Grid data movement/placement, policies for large-scale virtual organizations, and large-scale policy-aware grid architectures. In addition to supporting the PI, this project partially supported the training of 5 PhD students.

  20. Integrated Safety Management System Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-11-01

    This manual provides requirements and guidance for DOE and contractors to ensure development and implementation of an effective Integrated Safety Management system that is periodically reviewed and continuously improved. Canceled by DOE O 450.2.

  1. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    and Assistance Management SUBJECT: Delay of Rollout of the System for Award Management (SAM) by the General Services Administration (GSA) SUMMARY: Policy Flash 2012-45 provided...

  2. Shopping for outage management systems

    SciTech Connect (OSTI)

    Chou, Y.C.; Konneker, L.K.; Watkins, T.R.

    1995-12-31

    Customer service is becoming increasingly important to electric utilities. Outage management is an important part of customer service. Good outage management means quickly responding to outages and keeping customers informed about outages. Each outage equals lost customer satisfaction and lost revenue. Outage management is increasingly important because of new competition among utilities for customers, pressure from regulators, and internal pressure to cut costs. The market has several existing software products for outage management. How does a utility judge whether these products satisfy their specific needs? Technology is changing rapidly to support outage management. Which technology is proven and cost-effective? The purpose of this paper is to outline the procedure for evaluating outage management systems, and to discuss the key features to look for. It also gives our opinion of the features that represent state of the art. This paper will not discuss specific products or list vendors names.

  3. XCPU2 process management system

    SciTech Connect (OSTI)

    Ionkov, Latchesar; Van Hensbergen, Eric

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  4. Heating System Modernization, Management of Peripheral Scope...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Modernization, Management of Peripheral Scope Lessons Learned Report, NNSA, Dec 2010 Heating System Modernization, Management of Peripheral Scope Lessons Learned Report,...

  5. Civilian Radioactive Waste Management System Requirements Document...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level...

  6. Public Utilities Specialist (Policy and System Governance)

    Broader source: Energy.gov [DOE]

    This position is located in the Contract Management and Administration (KSC) organization of Customer Support Services (KS), Chief Operating Officer (K), Bonneville Power Administration (BPA)....

  7. System for Award Management (SAM):

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System for Award Management (SAM) ChallengeHER Opportunities for Women in Federal Contracting May 23, 2013 Judith R. Zawatsky General Services Administration You are here today because you want to: a) Get a contract with the federal government b) Get a grant from the federal government c) Increase the work you are already doing with the federal government d) Learn new acronyms WHERE DO YOU START? www.sam.gov WHAT IS SAM? The System for Award Management (SAM) is the Official U.S. Government

  8. Joint Environmental Management System (EMS) Declaration of Conformance...

    Energy Savers [EERE]

    Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of...

  9. Office of Energy Policy and Systems Analysis | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Energy Policy and Systems Analysis Office of Energy Policy and Systems Analysis The Quadrennial Energy Review The Quadrennial Energy Review The Quadrennial Energy Review (QER) is the first review of our nation's energy infrastructure. (Photo Credit: Dennis Schroeder/NREL) Read more Revolution Now Revolution Now For four key clean energy technologies, the clean energy future has already arrived. Read more Partnership for Energy Sector Climate Resilience Partnership for Energy Sector

  10. Office of Energy Policy and Systems Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Energy Policy and Systems Analysis Office of Energy Policy and Systems Analysis The Quadrennial Energy Review The Quadrennial Energy Review The Quadrennial Energy Review (QER) is the first review of our nation's energy infrastructure. (Photo Credit: Dennis Schroeder/NREL) Read more Revolution Now Revolution Now For four key clean energy technologies, the clean energy future has already arrived. Read more Partnership for Energy Sector Climate Resilience Partnership for Energy Sector

  11. Thermal management systems and methods

    DOE Patents [OSTI]

    Gering, Kevin L.; Haefner, Daryl R.

    2006-12-12

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  12. Battery Thermal Management System Design Modeling (Presentation)

    SciTech Connect (OSTI)

    Kim, G-H.; Pesaran, A.

    2006-10-01

    Presents the objectives and motivations for a battery thermal management vehicle system design study.

  13. COKEMASTER: Coke plant management system

    SciTech Connect (OSTI)

    Johanning, J.; Reinke, M.

    1996-12-31

    To keep coke utilization in ironmaking as competitive as possible, the potential to improve the economics of coke production has to be utilized. As one measure to meet this need of its customers, Krupp Koppers has expanded its existing ECOTROL computer system for battery heating control to a comprehensive Coke Plant Management System. Increased capacity utilization, lower energy consumption, stabilization of plant operation and ease of operation are the main targets.

  14. Information system revives materials management

    SciTech Connect (OSTI)

    Hansen, T.

    1995-12-01

    Through a change in philosophy and the development of a new, more efficient information management system, Arizona Public Service Co. (APSW) has, in less than two years, reduced material and service costs by 10 percent. The utility plans to cut these costs form 1993 figures by 25 percent before 2000. The utility is breaking new ground with ongoing implementation of new business processes and the new Materials Logistics Information System (MLIS), which has been co-developed with Texas Instruments Software Division (TISD).

  15. Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-05-20

    To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

  16. ORISE: Performance Improvement Management System (PIMS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Improvement Management System (PIMS) PIMS web-based application aids Veterans Health Administration (VHA) Emergency Management in response to local emergencies and...

  17. Partnering Policy for the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    As we journey on the road to excellence, we have embraced seven goals to focus our energies on achieving the Office of Environmental Management (EM) vision.

  18. Integrated Building Management System (IBMS)

    SciTech Connect (OSTI)

    Anita Lewis

    2012-07-01

    This project provides a combination of software and services that more easily and cost-effectively help to achieve optimized building performance and energy efficiency. Featuring an open-platform, cloud- hosted application suite and an intuitive user experience, this solution simplifies a traditionally very complex process by collecting data from disparate building systems and creating a single, integrated view of building and system performance. The Fault Detection and Diagnostics algorithms developed within the IBMS have been designed and tested as an integrated component of the control algorithms running the equipment being monitored. The algorithms identify the normal control behaviors of the equipment without interfering with the equipment control sequences. The algorithms also work without interfering with any cooperative control sequences operating between different pieces of equipment or building systems. In this manner the FDD algorithms create an integrated building management system.

  19. Appropriate Technology Management Information System

    SciTech Connect (OSTI)

    Not Available

    1984-02-01

    From 1978 to 1981, the Department of Energy (DOE) awarded more than 2200 small grants worth more than $25 million to individuals, organizations and small businesses across the nation for the purposes of researching, developing and demonstrating appropriate technologies. Grants were given in the full range of technology areas, including conservation, solar, biomass, wind, geothermal, and hydro power. The final report from each DOE grantee was reviewed in an effort to extract information about new ideas and proven concepts that could be of value to the public. To manage the growing wealth of information from the grant reports, and to monitor the report review process, the Appropriate Technology Management Information System (ATMIS), a computer data base, was developed. The ATMIS can classify data into numerous categories (technology area, geographic location, project status, etc.). This manual was generated directly from the data base.

  20. Energy.gov Content Management System

    Broader source: Energy.gov [DOE]

    Energy.gov Content Management SystemEERE's websites are hosted in Energy.gov's Drupal content management system (CMS), which is maintained by the U.S. Department of Energy's Public Affairs Office.

  1. Implementing a Corporate Energy Management System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing a Corporate Energy Management System" Steve ... Mr Micro- replication Pe Predictive Engineering & Modeling ... Environmental Legal Engineering Maintenance Purchasing ...

  2. ORISE: Performance Improvement Management System (PIMS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Improvement Management System (PIMS) PIMS web-based application aids Veterans Health Administration (VHA) Emergency Management in response to local emergencies and national disasters The Veterans Health Administration Performance Improvement Management System (VHA PIMS) is a web-based system for use by the VHA to systematically support the VHA's Comprehensive Emergency Management Program. The system provides a consistent and efficient approach to plan, develop, evaluate and improve

  3. Integrated Vehicle Thermal Management Systems (VTMS) Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Integrated Vehicle Thermal Management Power Electronic Thermal System Performance and Integration Characterization and Development of Advanced...

  4. Legal Management Tracking System Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legal Management Tracking System Page 1 of 1 Back to Case Costs Contractor Litigation - Law Firm Invoices Office: Richland Operations Office Parties: DWAYNE HALL v. FLUOR HANFORD, INC. The invoices for HALVERSON & SAUNDERS are listed below . *. To view/delete/edit an invoice, click on the date in the list . *. To add a new invoice, click "Add an Invoice" at the top of the list. HALVERSON & SAUNDERS Invoice Date Invoice Number Invoice Total 11/9/2009 216094 $38,180.59 10{15/2009

  5. Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    concerning this policy flash should be directed to Mike Dombrowski, of the Office of Acquisition and Project Management Policy at 202-287-1828 or at michael.dombrowski@hq.doe....

  6. Policy Development | Department of Energy

    Energy Savers [EERE]

    Policy Development Policy Development Policy Development Project Management Policy and Systems (PM-30) is working to update all Project Management related orders, guides, handbooks, and standard operating procedures that the Office of Project Management Oversight and Assessments (PM) has published. The primary focus of the updates are to insure that the orders and guides, handbooks and SOPs reflect the latest guidance that the Secretary of the Energy has outlined in his memorandum dated December

  7. Massachusetts Policy Guidance for Regulating Solar Energy Systems

    Broader source: Energy.gov [DOE]

    This policy guidance was established to summarize, explain, and help communities apply four of the Massachusetts statutes that apply to solar energy systems. These statutes include: Chapter 40A Section 3 (solar exemptions), Chapter 40A Section 9B (solar access), Chapter 187 Section 1A (solar easements), and Chapter 40C (Historic Districts).

  8. Single System Image Cluster Management

    Energy Science and Technology Software Center (OSTI)

    2004-02-13

    Cluster computing has quickly proven itself to be a capable workhorse for a wide variety of production computing tasks; however, setting up and maintaining a cluster still requires significantly more effort than administrating just a single machine. As computing hardware descreases in price and cluster sizes grow, it is becoming increasingly important to manage clusters cleverly so that a system administration effort can "scale" as well. To ease the task of mananging many machines, administratorsmore » often deploy an environment that is homogeneous across all nodes of a cluster, and maintain a snapshot of the filesystem as a 'master image'. However due to operational, behavioral, and physical constraints, many nodes often require numerous deviations from the master image in order to operate as desired.« less

  9. Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-10

    To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

  10. NATIONAL ENVIRONMENTAL POLICY ACT Management Review Team Conc~~rrence Sign-Off

    Office of Legacy Management (LM)

    ENVIRONMENTAL POLICY ACT Management Review Team Conc~~rrence Sign-Off April 24,2001 ACTION: DRAFT ENVIRONMENT ASSESSMENT OF GROUND WATER COMPLIANCE ACTIVITIES AT THE URANIUM MILL TAILINGS SITE, SHIPROCK, NEW MEXICO ISSUE: DraR Environmental Assessment of Ground Water Compliance at the Uranium Mill Tailings Site, Shiprock, New Mexico, to the Navajo Nation, federal and tribal regulatoly agencies, and other interested stakeholders for review and comment. RECOMMENDATION: The Management Review Team

  11. policy

    National Nuclear Security Administration (NNSA)

    eld-field-page-name">

    Page Name: 
    policysystem

    The NNSA's Policy...

  12. Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies Policies The Research Library provides a large collection of print and electronic books, journals, reports, conference proceedings and many audio/visual materials. Research Library items are available for check out to LANL employees and retirees only. Item Count There is a 50 item limit per customer. Loan Periods Books 28 days 10 days if on hold for another patron Reports 28 days for print copies 7 days for microfiche What if I lose materials that are on my record? Library materials

  13. Enforcement Policy: Split-System Central Air Conditioners Without HSVC

    Broader source: Energy.gov [DOE]

    DOE issued an enforcement policy that it would begin investigating the methods manufacturers are using to rate split-system central air conditioners that do not have a highest sales volume combination (HSVC) to test as required by the applicable regulations and that it would assess penalties for units manufactured after February 1, 2016, that have not been tested and properly certified as compliant with the applicable standards.

  14. Systems approaches to integrated solid waste management in developing countries

    SciTech Connect (OSTI)

    Marshall, Rachael E.; Farahbakhsh, Khosrow

    2013-04-15

    Highlights: ? Five drivers led developed countries to current solid waste management paradigm. ? Many unique factors challenge developing country solid waste management. ? Limited transferability of developed country approaches to developing countries. ? High uncertainties and decision stakes call for post-normal approaches. ? Systems thinking needed for multi-scale, self-organizing eco-social waste systems. - Abstract: Solid waste management (SWM) has become an issue of increasing global concern as urban populations continue to rise and consumption patterns change. The health and environmental implications associated with SWM are mounting in urgency, particularly in the context of developing countries. While systems analyses largely targeting well-defined, engineered systems have been used to help SWM agencies in industrialized countries since the 1960s, collection and removal dominate the SWM sector in developing countries. This review contrasts the history and current paradigms of SWM practices and policies in industrialized countries with the current challenges and complexities faced in developing country SWM. In industrialized countries, public health, environment, resource scarcity, climate change, and public awareness and participation have acted as SWM drivers towards the current paradigm of integrated SWM. However, urbanization, inequality, and economic growth; cultural and socio-economic aspects; policy, governance, and institutional issues; and international influences have complicated SWM in developing countries. This has limited the applicability of approaches that were successful along the SWM development trajectories of industrialized countries. This review demonstrates the importance of founding new SWM approaches for developing country contexts in post-normal science and complex, adaptive systems thinking.

  15. A model for international border management systems.

    SciTech Connect (OSTI)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  16. Financial Management System (FMS) Help & Knowledge Base

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Financial Management System (FMS) Help & Knowledge Base

  17. Earned Value Management System (EVMS) - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0A, Earned Value Management System (EVMS) by Rick Blaisdell Functional areas: Capital Assets, Contract Management, Program Management, Project Management This Guide provides...

  18. Energy Management Systems: Maximizing Energy Savings

    Broader source: Energy.gov [DOE]

    This webinar covered how to optimize installations of new energy management systems, review EMS strategies following lighting/HVAC retrofit projects, and utilize excess EECBG funding.

  19. Bechtel Environmental Integrated Database Management System

    Energy Science and Technology Software Center (OSTI)

    1995-04-11

    Bechtel Environmental Integrated Data Management System (BEIDMS1.4) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  20. Building International Emergency Management Systems | National...

    National Nuclear Security Administration (NNSA)

    Department of Energy's chief risk officer visits Nevada National Security Site NNSA sites prepared for disasters using real-time response management system DC Survey 2013 NNSA ...

  1. Building Management System Integrators | Open Energy Information

    Open Energy Info (EERE)

    Place: Berkshire, England, United Kingdom Zip: SL1 5AU Product: Service and maintenance provider. References: Building Management System Integrators1 This article is a...

  2. Introduction to an Energy Management System

    Broader source: Energy.gov [DOE]

    This presentation provides an overview to energy management system (EnMS) implementation describing what an EnMS is and why an EnMS is useful.

  3. UNCLASSIFIED Nuclear Materials Management & Safeguards System

    National Nuclear Security Administration (NNSA)

    Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number:...

  4. Policy Flash 2013-40 Acquisition Guide Chapter 43.3 – Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimburstment Contracts

    Broader source: Energy.gov [DOE]

    Attached is Policy Flash 2013-40 Acquisition Guide Chapter 43.3 – Maintaining Alignment of Project   Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement...

  5. Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS...

    Energy Savers [EERE]

    Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H...

  6. Quality Policy

    Broader source: Energy.gov [DOE]

    Quality Policy It is the policy of the Department of Energy to establish quality requirements to ensure that risks and environmental impacts are minimized and that safety, reliability, and performance are maximized through the application of effective management systems commensurate with the risks posed by the facility or activity and its work. The Department implements this policy through the QA Order and the QA rule directives to ensure quality assurance requirements are clearly specified for the broad spectrum of work performed by DOE and its contractors.

  7. HQ EMS Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMS Policy HQ EMS Policy Office of Administration Environmental Management System (EMS) Policy for Managing Department of Energy HQ Facilities This policy statement sets forth the commitments and basic structure of the Department of Energy (DOE) Headquarters Facility Environmental Management System (EMS). The scope of this EMS includes facility operations and support activities for the DOE Forrestal facility in Washington, DC and the Germantown facility in Germantown, Maryland. The DOE

  8. Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-08-20

    This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

  9. Comment and Response Management System

    Energy Science and Technology Software Center (OSTI)

    1998-06-09

    CRMS is a Web-based client/server application that helps manage, track, and report on institutional responses to public comments on published documents such as environmental impact statements.

  10. ORISE: Asset Readiness Management System (ARMS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Asset Readiness Management System (ARMS) Database tracks emergency response exercises and equipment to help DOE asses emergency preparedness Developed by the Oak Ridge Institute for Science and Education, the U.S. Department of Energy (DOE) Asset Readiness Management System (ARMS) is a database that merged with the NA-42 Events Tracking System to provide enhanced readiness reporting. How ORISE is Making a Difference The system enables DOE senior leadership to determine the readiness status of

  11. Dynamic analysis of the urban-based low-carbon policy using system dynamics: Focused on housing and green space

    SciTech Connect (OSTI)

    Hong, Taehoon; Kim, Jimin Jeong, Kwangbok; Koo, Choongwan

    2015-02-09

    To systematically manage the energy consumption of existing buildings, the government has to enforce greenhouse gas reduction policies. However, most of the policies are not properly executed because they do not consider various factors from the urban level perspective. Therefore, this study aimed to conduct a dynamic analysis of an urban-based low-carbon policy using system dynamics, with a specific focus on housing and green space. This study was conducted in the following steps: (i) establishing the variables of urban-based greenhouse gases (GHGs) emissions; (ii) creating a stock/flow diagram of urban-based GHGs emissions; (iii) conducting an information analysis using the system dynamics; and (iv) proposing the urban-based low-carbon policy. If a combined energy policy that uses the housing sector (30%) and the green space sector (30%) at the same time is implemented, 2020 CO{sub 2} emissions will be 7.23 million tons (i.e., 30.48% below 2020 business-as-usual), achieving the national carbon emissions reduction target (26.9%). The results of this study could contribute to managing and improving the fundamentals of the urban-based low-carbon policies to reduce greenhouse gas emissions.

  12. POLICY

    Energy Savers [EERE]

    3 POLICY * Successful execution of this research and development (R&D) program will materially contribute to U.S. supply of oil and gas both today and beyond the 10 year R&D horizon. It is the consensus of this Committee that the resource potential impacted by this technology program is significant and of major importance to the Nation. There is a critical need for a sustainable and consistent approach to the technology challenges facing unconventional resource development. * The

  13. Walk-in Cooler/Walk-in Freezer Refrigeration Systems - Enforcement Policy |

    Office of Environmental Management (EM)

    Department of Energy Walk-in Cooler/Walk-in Freezer Refrigeration Systems - Enforcement Policy Walk-in Cooler/Walk-in Freezer Refrigeration Systems - Enforcement Policy February 1, 2016 DOE will not seek civil penalties or injunctive relief concerning violations of certain energy conservation standards applicable to refrigeration systems of walk-in coolers/walk-in freezers. PDF icon Enforcement Policy - WICF (02/01/2016) PDF icon Enforcement Policy - WICF (8/31/2015 - OBSOLETE) PDF icon

  14. NNSA POLICY LETTER

    National Nuclear Security Administration (NNSA)

    POLICY LETTER Approved: 12-11-13 QUALITY MANAGEMENT SYSTEM NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of the Administrator NAP-26 CONTROLLED COPIES AVAILABLE AT: INITIATED BY: http://www.nnsa.energy.gov Office of Quality Management THIS PAGE INTENTIONALLY LEFT BLANK NAP-26 1 12-11-13 QUALITY MANAGEMENT SYSTEM 1. PURPOSE. Establish, implement, maintain, assess, and improve the Quality Management System (QMS) for NNSA Federal operations in compliance with the International Organization for

  15. Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-29

    The guide provide DOE line management information useful for implementing the provisions of DOE P 450.4A and the requirements and responsibilities of DOE O 450.2. Supersedes DOE G 450.4-1B and DOE G 450.3-3.

  16. POLICY

    Energy Savers [EERE]

    November 13, 2013 POLICY ď‚· Successful execution of this research and development (R&D) program will materially contribute to U.S. supply of oil and gas both today and beyond the 10 year R&D horizon. It is the consensus of this Committee that the resource potential impacted by this technology program is significant and of major importance to the Nation. There is a critical need for a sustainable and consistent approach to the technology challenges facing unconventional resource

  17. PIA - Foreign Travel Management System (FTMS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) PIA - Foreign Travel Management System (FTMS) PDF icon PIA - Foreign Travel Management System (FTMS) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  18. PIA - HSS Electronic Visitor Management System (HSEVMS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy HSS Electronic Visitor Management System (HSEVMS) PIA - HSS Electronic Visitor Management System (HSEVMS) PIA - HSS Electronic Visitor Management System (HSEVMS) PDF icon PIA - HSS Electronic Visitor Management System (HSEVMS) More Documents & Publications PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory

  19. Building International Emergency Management Systems | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Building International Emergency Management Systems | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases

  20. Methods of forming thermal management systems and thermal management methods

    DOE Patents [OSTI]

    Gering, Kevin L.; Haefner, Daryl R.

    2012-06-05

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  1. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  2. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  3. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Not Available

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

  4. Voices of Experience | Advanced Distribution Management Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... c Gas & Electric (PG&E) We hope that ... MANAGEMENT SYSTEMS | DOE 6 Keys to Our Success * Across organization-vision ... an archive copy or journal when data is ...

  5. Auto-Versioning Systems Image Manager

    Energy Science and Technology Software Center (OSTI)

    2013-08-01

    The av_sys_image_mgr utility provides an interface for the creation, manipulation, and analysis of system boot images for computer systems. It is primarily intended to provide a convenient method for managing the introduction of changes to boot images for long-lived production HPC systems.

  6. PIA - EERE Infrastructure-EERE Reviewer Management System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy EERE Infrastructure-EERE Reviewer Management System PIA - EERE Infrastructure-EERE Reviewer Management System PIA - EERE Infrastructure-EERE Reviewer Management System PDF icon PIA - EERE Infrastructure-EERE Reviewer Management System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - HSPD-12 Physical and Logical Access System PIA - Bonneville Power Adminstration Ethics Helpline

  7. NNSA Policies | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    About Us / Our Operations / Management and Budget / NNSA Policy System / NNSA Policies NNSA Policies NNSA Policies (NAPs) impart policy and requirements unique to the Administration or provide short-term notices until more formal direction can be provided. NAP-4B Corporate Performance Process for M&O Contractors June 30, 2008 NAP-6A Federal Employee Occupational Safety and Health Program May 13, 2014 NAP-7 NNSA's Acquisition and Assistance Policy Guidance December 9, 2002 NAP-14.1D Baseline

  8. Tank waste remediation system risk management list

    SciTech Connect (OSTI)

    Collard, L.B.

    1995-10-31

    The Tank Waste Remedation System (TWRS) Risk Management List and it`s subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists.

  9. Methods, systems, and computer program products for network firewall policy optimization

    DOE Patents [OSTI]

    Fulp, Errin W. (Winston-Salem, NC); Tarsa, Stephen J. (Duxbury, MA)

    2011-10-18

    Methods, systems, and computer program products for firewall policy optimization are disclosed. According to one method, a firewall policy including an ordered list of firewall rules is defined. For each rule, a probability indicating a likelihood of receiving a packet matching the rule is determined. The rules are sorted in order of non-increasing probability in a manner that preserves the firewall policy.

  10. Quality Assurance Management System Guide for Use with 10 CFR 830.120 and DOE O 414.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-06-17

    DOE Elements and DOE contractors should consult this Guide in order to develop and implement effective management systems that are consistent with the Department's quality expectations and that support the Safety Management System Policy, DOE P 450.4. Canceled by DOE G 414.1-2A. Does not cancel other directives.

  11. PIA - EMRC Livelink Records Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMRC Livelink Records Management System PIA - EMRC Livelink Records Management System PIA - EMRC Livelink Records Management System PDF icon PIA - EMRC Livelink Records Management System More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009

  12. Joint Environmental Management System (EMS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The

  13. PIA - Human Resources Management Information System (HRMIS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PIA - Human Resources Management Information System (HRMIS) PDF icon PIA - Human Resources Management Information System (HRMIS) More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory

  14. PIA - Human Resources Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System PIA - Human Resources Management System PIA - Human Resources Management System PDF icon PIA - Human Resources Management System More Documents & Publications PIA - INL PeopleSoft - Human Resource System PIA - Human Resources - Personal Information Change Request - Idaho National Engineering Laboratory PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  15. Development of an Integrated Distribution Management System

    SciTech Connect (OSTI)

    Schatz, Joe E.

    2010-10-20

    This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

  16. TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Logistical Challenges | Department of Energy TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical Challenges TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical Challenges TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical Challenges. Recommendations on how to share and compare failure experience between utilities for all devices in order to drive improvements in grid reliability, drive better

  17. Guidance for FY2014 Facilities Information Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for FY2014 Facilities Information Management System Data Validations Guidance for FY2014 Facilities Information Management System Data Validations PDF icon FY 2014 FIMS...

  18. V-125: Cisco Connected Grid Network Management System Multiple...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Cisco Connected Grid Network Management System Multiple Vulnerabilities V-125: Cisco Connected Grid Network Management System Multiple Vulnerabilities April 3, 2013 - 1:44am...

  19. Office of Personnel Management (OPM) Billing System PIA, Office...

    Energy Savers [EERE]

    Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security...

  20. Wireless Battery Management System for Safe High-Capacity Energy...

    Office of Scientific and Technical Information (OSTI)

    Wireless Battery Management System for Safe High-Capacity Energy Storage Citation Details In-Document Search Title: Wireless Battery Management System for Safe High-Capacity Energy ...

  1. South Asia Energy Management Systems Inc SAEMS | Open Energy...

    Open Energy Info (EERE)

    Energy Management Systems Inc SAEMS Jump to: navigation, search Name: South Asia Energy Management Systems, Inc. (SAEMS) Place: California Product: South Asia Energy is...

  2. Practical Ocean Energy Management Systems Inc POEMS | Open Energy...

    Open Energy Info (EERE)

    Ocean Energy Management Systems Inc POEMS Jump to: navigation, search Name: Practical Ocean Energy Management Systems Inc (POEMS) Place: San Diego, California Zip: 92138 Sector:...

  3. Concept for Management of the Future Electricity System (Smart...

    Open Energy Info (EERE)

    Concept for Management of the Future Electricity System (Smart Grid Project) Jump to: navigation, search Project Name Concept for Management of the Future Electricity System...

  4. Implementing a Corporate Energy Management System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementing a Corporate Energy Management System" Steve Schultz Corporate Energy Manager 3M Presented at the U.S. Department of Energy Industrial Technologies Program June 3, 2010 Webcast 3M - Solving Problems Everywhere  Operate companies in more than 65 countries  35 international companies with manufacturing operations, 35 with laboratories  In the United States, operations in 28 states  R&D and related expenditures total $6.861 billion for the last five years  More

  5. Vol 2, Integrated Safety Management System Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-05-27

    This Department of Energy (DOE) Integrated Safety Management System (ISMS) Guide is approved for use by the Office of Environment, Safety and Health (EH) and is available for use by all DOE components and their contractors. This Guide is a consensus document coordinated by EH and prepared under the direction of the DOE Safety Management Implementation Team (SMIT). Canceled by DOE G 450.4-1B.

  6. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PDF icon PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE More Documents & Publications PIA - INL Education Programs Business Enclave Manchester Software 1099 Reporting PIA, Idaho National Laboratory PIA - INL PeopleSoft - Human Resource System

  7. An economic evaluation of waste flow control policies in municipal solid waste management

    SciTech Connect (OSTI)

    Greco, J.

    1995-12-01

    The transport of municipal solid waste through legal means is commonly known as waste flow control. Flow control ordinances prohibit the export of locally generated solid waste to disposal sites outside of a jurisdiction, requiring delivery to a locally designated facility for disposal or processing. Local governments use flow control to support public facilities and to comply with federal and state mandates. A decision by Supreme Court in May, 1994 invalidated the use of flow control by local governments raising important policy questions concerning balances between providing low-cost service to rate-payers, the value of conserving disposal capacity be developing expensive waste management programs, and the protection of the environment from the dangers of poor solid waste management. Since Congress is currently considering passage of federal legislation which would restore flow control authority to local government, there is a need to evaluate waste flow control from economic, environmental, political and social perspectives. This analysis attempts to evaluate flow control policies within an interdisciplinary framework. It examines not only the economic consequences of flow control policies, but also the social and environmental objectives that local governments claim are achieved via use of flow control. The analysis reveals that flow control introduces economic distortions into a highly competitive market for solid waste services, a market which consistently produces lower costs than flow-controlled, publicly-sponsored facilities. Important questions are raised concerning the allocation of risk in capital investments made by municipalities that use flow control to insulate investors and themselves from financial liability. Controlling waste flow helps local governments fulfill regulatory responsibilities that may not be met by reliance on competitive market forces.

  8. M-16-02, Category Management Policy 15-1: Improving the Acquisition and Management of Common Information Technology: Laptops and Desktops

    Energy Savers [EERE]

    OFFICE OF MANAGEMENT AND BUDGET WASHINGTON , D. C . 2.0503 October 16, 2015 M-16-02 MEMORANDUM FOR THE HEADS OF DEPARTMENTS AND AGENCIES FROM: Anne E. Rung Administrator t Tony Scott United State SUBJECT: Category Management Policy 15-1: Improving the Acquisition and Management of Common Information Technology: Laptops and Desktops The Federal Government spends over $50 billion a year on hardware, software, telecommunications, IT security, and IT professional services through tens ofthousands

  9. Systems approach to project risk management

    SciTech Connect (OSTI)

    Kindinger, J. P.

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  10. Facilities Information Management System (FIMS) | Department of Energy

    Energy Savers [EERE]

    Facilities Information Management System (FIMS) Facilities Information Management System (FIMS) FIMS is DOE's corporate database for real property as required by DOE Order 430.1B, Real Property Asset Management. The system provides DOE with an accurate inventory and management tool that assists with planning and managing all current real property assets. The DOE Office of Acquisition and Project Management, the Office of Management and Budget, Congress, and other Federal entities use the real

  11. PEP TALK "Policy - EVMS - PARS" Update, Mel Frank, Chief, Project Systems

    Energy Savers [EERE]

    Division, PM | Department of Energy PEP TALK "Policy - EVMS - PARS" Update, Mel Frank, Chief, Project Systems Division, PM PEP TALK "Policy - EVMS - PARS" Update, Mel Frank, Chief, Project Systems Division, PM Topics Discussed: New Handbooks New Terms and Definitions Training Opportunities/Snippets Data Driven Reviews Improvement Initiative Interpretation Handbook Current State/Challenges* Planned Enhancements Policy and Guidance / EVMS / PARS IIe PDF icon PEP Talk

  12. Project Management Information Systems (PMIS) | Department of Energy

    Energy Savers [EERE]

    Project Management Information Systems (PMIS) Project Management Information Systems (PMIS) Project Management Information Systems (PMIS) Project Assessment & Reporting System (PARS IIe) Office of Project Management Oversight & Assessments (PM) manages and operates Project Assessment and Reporting System (PARS IIe) - the Department's official "System of Record" for project information, documentation, and performance data of all non-IT Capital Asset Acquisitions. It is used by

  13. INFORMATION ON THE SYSTEM FOR AWARD MANAGEMENT (SAM)

    Broader source: Energy.gov (indexed) [DOE]

    THE SYSTEM FOR AWARD MANAGEMENT (SAM) Eight federal procurement systems and the Catalog of Federal Domestic Assistance will be combined into one new system, the System for Award...

  14. Improving Mission Execution by Integrating our Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-03

    Request for analysis and preliminary set of alternatives for the integration of management systems within DOE.

  15. DOE Headquarters (HQ) Environmental Management System (EMS) Policy

    Energy Savers [EERE]

  16. POLICY FLASH 2013-55 FPDS-NG Change Management Notice for the...

    Broader source: Energy.gov (indexed) [DOE]

    policy-flashes Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov...

  17. Data management system for organic soil

    SciTech Connect (OSTI)

    Stinnette, P.

    1999-07-01

    A Data Management System for Organic Soil (DMSOS) has been developed that enables the acquisition, management and analysis of organic soil data as well as the presentation of results to be conducted effectively through a common interface. This development was in response to the data management needs of research investigating the engineering properties of organic soil and its extension to the stabilization of organic soil through dynamic replacement (DR). It is shown how the above functions are implemented efficiently using Windows-based software to perform comprehensive data management and analysis of data gathered from both laboratory and field tests. When the engineering properties of a given organic soil deposit are needed, a build-in Computer Advisor for Organic Soil Projects (CAOSP) predicts the properties from DMSOS based correlations. A unique and useful feature of the CAOSP is its ability to estimate the anticipated ultimate settlement of an organic soil deposit given the loading conditions and the moisture or organic content. Also incorporated in the DMSOS is a quality control system that utilizes computerized data acquisition/data management techniques in order to evaluate the degree of improvement of an organic soil layer at a given stage of treatment using DR.

  18. Planning for an Energy Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning for an Energy Management System Planning for an Energy Management System This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans. PDF icon Planning for an Energy Management System (May 3, 2012) More Documents & Publications The Do and Check Processes of an Energy Management System Introduction to an Energy

  19. Optimal management of batteries in electric systems

    DOE Patents [OSTI]

    Atcitty, Stanley (Albuquerque, NM); Butler, Paul C. (Albuquerque, NM); Corey, Garth P. (Albuquerque, NM); Symons, Philip C. (Morgan Hill, CA)

    2002-01-01

    An electric system including at least a pair of battery strings and an AC source minimizes the use and maximizes the efficiency of the AC source by using the AC source only to charge all battery strings at the same time. Then one or more battery strings is used to power the load while management, such as application of a finish charge, is provided to one battery string. After another charge cycle, the roles of the battery strings are reversed so that each battery string receives regular management.

  20. Pre-Validated Signal Database Management System

    Energy Science and Technology Software Center (OSTI)

    1996-12-18

    SPRT/DBMS is a pre-validated experimental database management system for industries where large volumes of process signals are acquired and archived. This system implements a new and powerful pattern recognition method, the spectrum transformed sequential testing (STST or ST2) procedure. A network of interacting ST2 modules deployed in parallel is integrated with a relational DBMS to fully validate process signals as they are archived. This reliable, secure DBMS then provides system modelers, code developers, and safetymore » analysts with an easily accessible source of fully validated process data.« less

  1. V-132: IBM Tivoli System Automation Application Manager Multiple...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, ... T-694: IBM Tivoli Federated Identity Manager Products Multiple Vulnerabilities V-145: IBM ...

  2. Managing Design and Construction Using Systems Engineering for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A by Roland Frenck Functional areas: Construction and Engineering, Program Management This...

  3. Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-05-27

    This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

  4. Earned Value Management System Gold Card | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gold Card Earned Value Management System Gold Card Earned Value Management (EVM) is a systematic approach to the integration and measurement of cost, schedule, and technical ...

  5. Project Management and Systems Support | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Project Management and Systems Support | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation...

  6. Contractor Earned Value Management System Certification Status | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Earned Value Management System Certification Status Contractor Earned Value Management System Certification Status Certification Status for major EM Contracts PDF icon Contractor Earned Value Management System Certification Status More Documents & Publications VPP Participant Status EM Major Contracts Awarded Since 2006 DOE Site Facility Management Contracts Internet Posting

  7. Electronic Document Management System PIA, BechtelJacobs Company, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC Electronic Document Management System PIA, BechtelJacobs Company, LLC PDF icon Electronic Document Management System PIA, BechtelJacobs Company, LLC More Documents & Publications Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs Company, LLC

  8. DOCS System Configuration Management Plan | Department of Energy

    Office of Environmental Management (EM)

    DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering project, can be used as a template to facilitate the creation of the CMP for your particular project. PDF icon DOCS System Configuration Management Plan More Documents & Publications OPC Security Whitepaper #3Hardening Guidelines for OPC Hosts NMMSS Software Quality Assurance Plan ABB SCADA/EMS System INEEL Baseline

  9. System and method for advanced power management

    DOE Patents [OSTI]

    Atcitty, Stanley (Albuquerque, NM); Symons, Philip C. (Surprise, AZ); Butler, Paul C. (Albuquerque, NM); Corey, Garth P. (Albuquerque, NM)

    2009-07-28

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  10. Earned Value Management System Interpretation Handbook (EVMSIH) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Interpretation Handbook (EVMSIH) Earned Value Management System Interpretation Handbook (EVMSIH) The DOE EVMS Interpretation Handbook EVMSIH is the basis for defining and assessing EVMS compliance to the EIA-748 Guidelines. It was developed in collaboration with DOE and contractor EVMS experts, and based extensively on the complete EVM historical body of knowledge documents from industry and various Government organizations as well as DOE unique situations/conditions.

  11. emergency management systems | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    systems | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home

  12. UNCLASSIFIED Nuclear Materials Management & Safeguards System

    National Nuclear Security Administration (NNSA)

    Nuclear Materials Management & Safeguards System CHANGE OF PROJECT NUMBER UPDATE PROJECT Project Number: Title: Date Valid: Date Deactivated: Classification Codes: Project Number: Project Title: Associated Materials: Programmatic RIS Previous Project Number(s) Status Code Allotment Code (S=Supplier, U=User) I authorize that the information listed above is for the NMMSS Program to use as part of the project number conversion process for this facility. Signature of Authorized Official Date

  13. Integrated Cloud Based Environmental Data Management System

    Office of Environmental Management (EM)

    NNSA U N C L A S S I F I E D Integrated Cloud Based Environmental Data Management System Penny Gomez (pgomez@lanl.gov) Los Alamos National Laboratory Data System Integration Project Leader LA-UR-12-21030 Chris EchoHawk (echohawk@lanl.gov) Los Alamos National Laboratory Environmental Data and Analysis Group Leader Karen Schultz Paige (ksp@lanl.gov) Los Alamos National Laboratory Intellus Project Leader Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA U N C L

  14. New York Independent System Operator, Smart Grid RFI: Addressing Policy and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Logistical Challenges. | Department of Energy York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges. New York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges. In response to the Department of Energy's (DOE) Request for Information regarding smart grid implementation listed in the September 17, 2010 Federal Register, the New York Independent System Operator, Inc. (NYISO) offers the attached white paper entitled

  15. Multi-resolution integrated modeling for basin-scale water resources management and policy analysis

    SciTech Connect (OSTI)

    Gupta, Hoshin V. (Hoshin Vijai),; Brookshire, David S.; Springer, E. P.; Wagener, Thorsten

    2004-01-01

    Approximately one-third of the land surface of the Earth is considered to be arid or semi-arid with an annual average of less than 12-14 inches of rainfall. The availability of water in such regions is of course, particularly sensitive to climate variability while the demand for water is experiencing explosive population growth. The competition for available water is exerting considerable pressure on the water resources management. Policy and decision makers in the southwestern U.S. increasingly have to cope with over-stressed rivers and aquifers as population and water demands grow. Other factors such as endangered species and Native American water rights further complicate the management problems. Further, as groundwater tables are drawn down due to pumping in excess of natural recharge, considerable (potentially irreversible) environmental impacts begin to be felt as, for example, rivers run dry for significant portions of the year, riparian habitats disappear (with consequent effects on the bio-diversity of the region), aquifers compact resulting in large scale subsidence, and water quality begins to suffer. The current drought (1999-2002) in the southwestern U.S. is raising new concerns about how to sustain the combination of agricultural, urban and in-stream uses of water that underlie the socio-economic and ecological structure in the region. The water stressed nature of arid and semi-arid environments means that competing water uses of various kinds vie for access to a highly limited resource. If basin-scale water sustainability is to be achieved, managers must somehow achieve a balance between supply and demand throughout the basin, not just for the surface water or stream. The need to move water around a basin such as the Rio Grande or Colorado River to achieve this balance has created the stimulus for water transfers and water markets, and for accurate hydrologic information to sustain such institutions [Matthews et al. 2002; Brookshire et al 2003; Krause, Chermak Brookshire, 2003].

  16. Project Management Information Systems (PMIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Information Systems (PMIS) Project Management Information Systems (PMIS) Project Assessment & Reporting System (PARS IIe) Office of Project Management Oversight & Assessments (PM) manages and operates Project Assessment and Reporting System (PARS IIe) - the Department's official "System of Record" for project information, documentation, and performance data of all non-IT Capital Asset Acquisitions. It is used by Federal and contractor personnel across the

  17. Environmental management system objectives & targets results summary :

    SciTech Connect (OSTI)

    Vetter, Douglas Walter

    2014-04-01

    Sandia National Laboratories/New Mexicos (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NMs operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL/NM Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2013.

  18. Policy Flash 2012-45 | Department of Energy

    Office of Environmental Management (EM)

    5 Policy Flash 2012-45 Attached is Policy Flash 2012-45 Rollout of the System for Award Management (SAM) by the General Services Administration (GSA) Questions should be directed...

  19. V-174: RSA Authentication Manager Writes Operating System, SNMP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: RSA Authentication Manager Writes Operating System, SNMP, and HTTP Plug-in Proxy Passwords in Clear Text to Log Files V-174: RSA Authentication Manager Writes Operating System,...

  20. Advanced Topics for the Portfolio Manager Initiative: Energy Disclosure Policy Implementation

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on the Energy Disclosure Policy Implementation

  1. Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance

  2. ORISE: DOE Office of Energy Policy and Systems Analysis is seeking...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Policy and Systems Analysis is seeking a postgraduate to research clean energy innovation and deployment in Washington, D.C. office Deadline to apply is Nov. 30,...

  3. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 & Vol 2

    SciTech Connect (OSTI)

    PARSONS, J.E.

    2000-07-15

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  4. V-132: IBM Tivoli System Automation Application Manager Multiple

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vulnerabilities | Department of Energy 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security

  5. Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

  6. Stand-Alone Battery Thermal Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stand-Alone Battery Thermal Management System Stand-Alone Battery Thermal Management System 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon es135_brodie_2012_p.pdf More Documents & Publications Stand-Alone Battery Thermal Management System Vehicle Technologies Office Merit Review 2014: Stand-Alone Battery Thermal Management System Vehicle Technologies Office Merit Review 2015: Stand-Alone Battery Thermal

  7. Current Trends in Policy - What's new? - Berta Schreiber, Director...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Acquisition and Project Management (APM) Workshop Presentations Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) Microsoft Word - ALonEO13423Last.doc

  8. EMS - Environmental Management System | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directory Environment, Safety & Health Environmental Management System Joint Working Group for Fusion Safety Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer Contact Us Business Operations Careers/ Human Resources Directory Environment, Safety & Health Environmental Management System Joint Working Group for Fusion Safety Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer EMS - Environmental Management System Environmental

  9. Stand Alone Battery Thermal Management System

    SciTech Connect (OSTI)

    Brodie, Brad

    2015-09-30

    The objective of this project is research, development and demonstration of innovative thermal management concepts that reduce the cell or battery weight, complexity (component count) and/or cost by at least 20%. The project addresses two issues that are common problems with current state of the art lithium ion battery packs used in vehicles; low power at cold temperatures and reduced battery life when exposed to high temperatures. Typically, battery packs are “oversized” to satisfy the two issues mentioned above. The first phase of the project was spent making a battery pack simulation model using AMEsim software. The battery pack used as a benchmark was from the Fiat 500EV. FCA and NREL provided vehicle data and cell data that allowed an accurate model to be created that matched the electrical and thermal characteristics of the actual battery pack. The second phase involved using the battery model from the first phase and evaluate different thermal management concepts. In the end, a gas injection heat pump system was chosen as the dedicated thermal system to both heat and cool the battery pack. Based on the simulation model. The heat pump system could use 50% less energy to heat the battery pack in -20°C ambient conditions, and by keeping the battery cooler at hot climates, the battery pack size could be reduced by 5% and still meet the warranty requirements. During the final phase, the actual battery pack and heat pump system were installed in a test bench at DENSO to validate the simulation results. Also during this phase, the system was moved to NREL where testing was also done to validate the results. In conclusion, the heat pump system can improve “fuel economy” (for electric vehicle) by 12% average in cold climates. Also, the battery pack size, or capacity, could be reduced 5%, or if pack size is kept constant, the pack life could be increased by two years. Finally, the total battery pack and thermal system cost could be reduced 5% only if the system is integrated with the vehicle cabin air conditioning system. The reason why we were not able to achieve the 20% reduction target is because of the natural decay of the battery cell due to the number of cycles. Perhaps newer battery chemistries that are not so sensitive to cycling would have more potential for reducing the battery size due to thermal issues.

  10. PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BUSINESS ENCLAVE PDF icon PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ... 1099 Reporting PIA, Idaho National Laboratory PIA - INL PeopleSoft - Human Resource System

  11. Energy Management Systems Package for Small Commercial Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Package for Small Commercial Buildings Energy Management Systems Package for Small Commercial Buildings Commercial Buildings Integration Project for the 2013 Building...

  12. A hybrid inventory management system respondingto regular demand and surge demand

    SciTech Connect (OSTI)

    Mohammad S. Roni; Mingzhou Jin; Sandra D. Eksioglu

    2014-06-01

    This paper proposes a hybrid policy for a stochastic inventory system facing regular demand and surge demand. The combination of two different demand patterns can be observed in many areas, such as healthcare inventory and humanitarian supply chain management. The surge demand has a lower arrival rate but higher demand volume per arrival. The solution approach proposed in this paper incorporates the level crossing method and mixed integer programming technique to optimize the hybrid inventory policy with both regular orders and emergency orders. The level crossing method is applied to obtain the equilibrium distributions of inventory levels under a given policy. The model is further transformed into a mixed integer program to identify an optimal hybrid policy. A sensitivity analysis is conducted to investigate the impact of parameters on the optimal inventory policy and minimum cost. Numerical results clearly show the benefit of using the proposed hybrid inventory model. The model and solution approach could help healthcare providers or humanitarian logistics providers in managing their emergency supplies in responding to surge demands.

  13. The Dark Energy Survey Data Management System

    SciTech Connect (OSTI)

    Mohr, Joseph J.; Barkhouse, Wayne; Beldica, Cristina; Bertin, Emmanuel; Dora Cai, Y.; Nicolaci da Costa, Luiz A.; Darnell, J.Anthony; Daues, Gregory E.; Jarvis, Michael; Gower, Michelle; Lin, Huan; /Fermilab /Rio de Janeiro Observ.

    2008-07-01

    The Dark Energy Survey (DES) collaboration will study cosmic acceleration with a 5000 deg2 griZY survey in the southern sky over 525 nights from 2011-2016. The DES data management (DESDM) system will be used to process and archive these data and the resulting science ready data products. The DESDM system consists of an integrated archive, a processing framework, an ensemble of astronomy codes and a data access framework. We are developing the DESDM system for operation in the high performance computing (HPC) environments at the National Center for Supercomputing Applications (NCSA) and Fermilab. Operating the DESDM system in an HPC environment offers both speed and flexibility. We will employ it for our regular nightly processing needs, and for more compute-intensive tasks such as large scale image coaddition campaigns, extraction of weak lensing shear from the full survey dataset, and massive seasonal reprocessing of the DES data. Data products will be available to the Collaboration and later to the public through a virtual-observatory compatible web portal. Our approach leverages investments in publicly available HPC systems, greatly reducing hardware and maintenance costs to the project, which must deploy and maintain only the storage, database platforms and orchestration and web portal nodes that are specific to DESDM. In Fall 2007, we tested the current DESDM system on both simulated and real survey data. We used TeraGrid to process 10 simulated DES nights (3TB of raw data), ingesting and calibrating approximately 250 million objects into the DES Archive database. We also used DESDM to process and calibrate over 50 nights of survey data acquired with the Mosaic2 camera. Comparison to truth tables in the case of the simulated data and internal crosschecks in the case of the real data indicate that astrometric and photometric data quality is excellent.

  14. Policy and Financing for Sustainable Land Management in Sub-Saharan...

    Open Energy Info (EERE)

    Agriculture Topics: Finance, Policiesdeployment programs Resource Type: Guidemanual, Lessons learnedbest practices Website: www.caadp.netpdfPolicy%20and%20Financing%20for%2...

  15. Integrating science and policy in natural resource management: Lessons and opportunities from North America

    SciTech Connect (OSTI)

    Clark, R.N.; Meidinger, E.E.; Miller, G.; Rayner, J.; Layseca, M.

    1998-09-01

    Relations between science and policy concerning many issues (e.g., health, energy, natural resources) have been changing worldwide. Public pressure to resolve such complex and often controversial issues has resulted in policymakers and policy implementers seeking better knowledge on which to base their decisions. As a result, scientists have become more activity engaged in the creation and evaluation of policy. In this paper, the authors summarize the literature and experience in how Canada, Mexico, and the United States approach the integration of science and policy; the authors describe some apparent barriers and lessons; and they suggest some issues that may prove fruitful for discussion and future collaboration.

  16. LED lamp power management system and method

    SciTech Connect (OSTI)

    Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

    2013-03-19

    An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

  17. Policy Analysis Modeling System (PAMS) | Open Energy Information

    Open Energy Info (EERE)

    System AgencyCompany Organization: Lawrence Berkeley National Laboratory Sector: Energy Focus Area: Buildings, Energy Efficiency Topics: Policiesdeployment programs...

  18. Departmental Integrated Safety Management System (9-23-10)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-09-23

    This directive will convert and consolidate DOE M 450.4-1, Integrated Safety Management System Manual and DOE M 411.1-1C, Safety Management Functions, Responsibilities, and Authorities Manual into a single Order.

  19. Cloud-Based Transportation Management System Delivers Savings | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Cloud-Based Transportation Management System Delivers Savings Cloud-Based Transportation Management System Delivers Savings October 21, 2014 - 1:53pm Addthis DOE's cloud based transportation management system (ATLAS) offers dramatically enhanced capabilities and modernization. ATLAS provides a powerful user-friendly system built to allow access to information to meet transportation needs. Its processes promote regulatory compliance, while providing access to qualified carriers and

  20. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  1. DOE Policies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Policies DOE Policies DOE Policies The CIO defines IT processes and policies using the Common Baseline for IT Management, consistent with OMB M-15-14. Access policy documents from the list below: Information Management Planning DOE Guide to IT Capital Planning and Investment, September 2016(pdf) DOE G 242.1-1, Forms Management Guide (pdf) Web Domain Name Policy REFERENCE NUMBER POLICY NAME APPROVED DATE DESCRIPTION DOE O 200.1A Information Technology Management Dec 23, 2008 Implementation

  2. Earned Value Management System RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Earned Value Management System RM Earned Value Management System RM In recent years Department of Energy (DOE) has developed a number of orders, and guidance documents aimed to improve the overall performance of project management and the acquisition of capital assets with the DOE complex. One of the most important activities or products required by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assess, to strengthen the overall performance of project

  3. Cryptographic Trust Management System Design Document

    SciTech Connect (OSTI)

    Edgar, Thomas W.; Clements, Samuel L.; Hadley, Mark D.; Maiden, Wendy M.; Manz, David O.; Zabriskie, Sean J.

    2010-08-04

    Deliverable for DOE NSTB Cryptographic Trust Management project. Design document to follow the Requirements document submitted in Sept 2009.

  4. Battery Thermal Management System Design Modeling

    SciTech Connect (OSTI)

    Pesaran, A.; Kim, G. H.

    2006-11-01

    Looks at the impact of cooling strategies with air and both direct and indirect liquid cooling for battery thermal management.

  5. Energy Management for Motor-Driven Systems

    Broader source: Energy.gov [DOE]

    This document assists in establishing an energy management plan, identifying energy savings opportunities, and designing a motor improvement plan.

  6. Distributed Solar PV for Electricity System Resiliency: Policy and Regulatory Considerations (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-11-01

    Distributed Solar PV systems have the potential of increasing the grid's resiliency to unforeseen events, such as extreme weather events and attacks. This paper presents the role that distributed PV can play in electric grid resiliency, introduces basic system design requirements and options, and discusses the regulatory and policy options for supporting the use of distributed PV for the purpose of increased electricity resiliency.

  7. Waste Information Management System-2012 - 12114

    SciTech Connect (OSTI)

    Upadhyay, H.; Quintero, W.; Shoffner, P.; Lagos, L.; Roelant, D. [Applied Research Center, Florida International University, 10555 West Flagler Street, Suite 2100, Miami, FL 33174 (United States)

    2012-07-01

    The Waste Information Management System (WIMS) -2012 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. It has replaced the historic process of each DOE site gathering, organizing, and reporting their waste forecast information utilizing different databases and display technologies. In addition, WIMS meets DOE's objective to have the complex-wide waste forecast and transportation information available to all stakeholders and the public in one easy-to-navigate system. The enhancements to WIMS made since its initial deployment include the addition of new DOE sites and facilities, an updated waste and transportation information, and the ability to easily display and print customized waste forecast, the disposition maps, GIS maps and transportation information. The system also allows users to customize and generate reports over the web. These reports can be exported to various formats, such as Adobe{sup R} PDF, Microsoft Excel{sup R}, and Microsoft Word{sup R} and downloaded to the user's computer. Future enhancements will include database/application migration to the next level. A new data import interface will be developed to integrate 2012-13 forecast waste streams. In addition, the application is updated on a continuous basis based on DOE feedback. (authors)

  8. Enterprise Assessments Targeted Review of the Safety System Management of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Secondary Confinement System and Power Distribution Safety System at the Y-12 National Security Complex Highly Enriched Uranium Materials Facility - December 2015 | Department of Energy Targeted Review of the Safety System Management of the Secondary Confinement System and Power Distribution Safety System at the Y-12 National Security Complex Highly Enriched Uranium Materials Facility - December 2015 Enterprise Assessments Targeted Review of the Safety System Management of the Secondary

  9. Energy Policy and Systems Analysis Presentation: Energy Modeling 101

    Broader source: Energy.gov [DOE]

    This presentation covers the basics of power sector capacity expansion modeling, and briefly touches on other types of modeling and analytical tools available to provide data on the electric power system, including energy efficiency.

  10. Internal Policy Library

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    230-1 Monitoring and Recording Conversations BPA Policy 230-2 Reporting Incidents of Fraud, Waste and Abuse BPA Policy 231-2 Power Transacting Risk Management BPA Policy 231-3...

  11. Energy management system for a rotary machine and method therefor

    DOE Patents [OSTI]

    Bowman, Michael John; Sinha, Gautam (NMN); Sheldon, Karl Edward

    2004-11-09

    In energy management system is provided for a power generating device having a working fluid intake in which the energy management system comprises an electrical dissipation device coupled to the power generating device and a dissipation device cooling system configured to direct a portion of a working fluid to the electrical dissipation device so as to provide thermal control to the electrical dissipation device.

  12. NO2 Management in Diesel Exhaust System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NO2 Management in Diesel Exhaust System NO2 Management in Diesel Exhaust System The project discusses the use of an NO2 mitigator for catalytic NO2 reduction PDF icon deer09_roberts.pdf More Documents & Publications Non-Petroleum-Based Fuels: Effects on Emissions Control Technologies Low Temperature Catalyst for Fuel Injection System Leading Edge Technology in Diesel Emissions Control

  13. Recommendation 171: Commendation for Waste Information Management System |

    Office of Environmental Management (EM)

    Department of Energy 1: Commendation for Waste Information Management System Recommendation 171: Commendation for Waste Information Management System The ORSSAB commends DOE and Florida International University for development of the Waste Information Management System and strongly recommends that it be periodically updated and improved. PDF icon Recommendation 171 PDF icon DOE response to recommendation 171 PDF icon DOE Gelles response to recommendation 171 More Documents & Publications

  14. Voices of Experience | Advanced Distribution Management Systems_brochure.indd

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Insights into Advanced Distribution Management Systems VOICES of Experience February, 2015 Prepared for the U.S. Department of Energy by the National Renewable Energy Laboratory under contract No. DE-AC36-08G028308, Subtask SG10.1011 in conjunction with Energetics Incorporated under contract No. GS-10F-0103J, Subtask J3806.0002. INSIGHTS INTO ADVANCED DISTRIBUTION MANAGEMENT SYSTEMS | DOE 3 Voices of Experience | Advanced Distribution Management Systems When people think of the electric power

  15. SRNS Environmental Management System External Audit | Department of Energy

    Energy Savers [EERE]

    SRNS Environmental Management System External Audit SRNS Environmental Management System External Audit August 2009 Presenter: Eloy Saldivar, SRNS Track 7-1 Topics Covered: EMS Customer Satisfaction Contractor Profile/Integration Integration of EMS into ISM EMS External Audit EMS "Declaration of Conformance" EMS Configuration Control EMS Impact on SRS Processes, Products and Services PDF icon SRNS Environmental Management System External Audit More Documents & Publications ARRA

  16. Guidance for FY2014 Facilities Information Management System Data

    Office of Environmental Management (EM)

    Validations | Department of Energy FY2014 Facilities Information Management System Data Validations Guidance for FY2014 Facilities Information Management System Data Validations PDF icon FY 2014 FIMS Data Validation Guidance w MEMO.pdf More Documents & Publications Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations Deputy Secretary Memo on Improving DOE-wide Recruitment and Hiring Processes FY2012 Three

  17. ORISE: DOE Office of Energy Policy and Systems Analysis is seeking a

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    postgraduate to research clean energy innovation and deployment in Washington D.C. office DOE Office of Energy Policy and Systems Analysis is seeking a postgraduate to research clean energy innovation and deployment in Washington, D.C. office Deadline to apply is Nov. 30, 2015 FOR IMMEDIATE RELEASE Nov. 19, 2015 FY16-09 OAK RIDGE, Tenn.-The U.S. Department of Energy (DOE) Office of Energy Policy and Systems Analysis is seeking a researcher who received a master's or doctorate degree within

  18. Job Scheduling Policy for BG/Q Systems | Argonne Leadership Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facility Policy for BG/Q Systems Contents Mira Job Scheduling Mira Queues User Interface Backfill Queue INCITE/ALCC Overburn Policy Big Run Monday Cetus Job Scheduling Vesta Job Scheduling General Scheduling Guidelines System Maintenance Day Jobs on Hold Reservations Back to top Mira Job Scheduling queue layout Back to top Mira Queues User Queue Queue Nodes Wall-clock Time (hours) Maximum Running per User Maximum Queued Per User prod prod-short 512 - 4096 0 - ≤6 5 20 prod-long 512 - 4096

  19. Energy.gov Content Management System Data Tables

    Broader source: Energy.gov [DOE]

    For Office of Energy Efficiency and Renewable Energy (EERE) websites, follow these guidelines for creating Section 508-compliant data tables in the Energy.gov content management system.

  20. Aging Management Program for Stainless Steel Dry Storage System Canisters

    SciTech Connect (OSTI)

    Dunn, Darrell S.; Lin, Bruce P.; Meyer, Ryan M.; Anderson, Michael T.

    2015-06-01

    This is a conference paper presenting an aging management program for stainless steel dry storage system canisters. NRC is lead author of paper. PNNL provided input.

  1. Effects of Home Energy Management Systems on Distribution Utilities...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Effects of Home Energy Management Systems on Distribution Utilities and Feeders under Various Market Structures Preprint Mark Ruth, Annabelle Pratt, Monte Lunacek, Saurabh Mittal,...

  2. Energy.gov Content Management System Requirements and Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Learn more about coding outside of the Energy.gov Content Management System. Communication Standards & Guidelines Home Publications, Exhibits, & Logos Websites & Digital Media Web ...

  3. Energy Management System Implementation Â… Second Webinar- Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ISO 50001 and other international standard committees * Trained and coached manufacturers through their implementation of management systems * Developed MSE 2000, precursor to ISO ...

  4. Energy Management System Implementation Â… First Webinar- Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ISO 50001 and other international standard committees * Trained and coached manufacturers through their implementation of management systems * Developed MSE 2000, precursor to ISO ...

  5. Energy Management System Implementation Â… Do and Check

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ISO 50001 and other international standard committees * Trained and coached manufacturers through their implementation of management systems * Developed MSE 2000, precursor to ISO ...

  6. Title 40 CFR 260: Hazardous Waste Management System: General...

    Open Energy Info (EERE)

    : Hazardous Waste Management System: General Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 CFR 260: Hazardous...

  7. Mercury-metadata data management system

    Energy Science and Technology Software Center (OSTI)

    2008-01-03

    Mercury is a federated metadata harvesting, search and retrieval tool based on both open source software and software developed at Oak Ridge National Laboratory. It was originally developed for NASA, USGS, and DOE. A major new version of Mercury (version 3.0) was developed during 2007 and released in early 2008. This Mercury 3.0 version provides orders of magnitude improvements in search speed, support for additional metadata formats, integration with Google Maps for spatial queries, facettedmore » type search, support for RSS delivery of search results, and ready customization to meet the needs of the multiple projects which use Mercury. For the end users, Mercury provides a single portal to very quickly search for data and information contained in disparate data management systems. It collects metadata and key data from contributing project servers distributed around the world and builds a centralized index. The Mercury search interfaces then allow the users to perform simple, fielded, spatial, and temporal searches across these metadata sources. This centralized repository of metadata with distributed data sources provides extremely fast search results to the user, while allowing data providers to advertise the availability of their data and maintain complete control and ownership of that data.« less

  8. ISO 50001 Conformant Energy Management Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Building Pilots GaTech Energy Management Coaching LBNL Technical & Program Strategy DOE ... Experts * EnMS Implementation Coaching, Training, Tools * Document Review & ...

  9. Fermilab | Director's Policy Manual | Home

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Financial Management Freedom of Information Act Requests Inclement Weather and Snow Policy Interactions with Legislators Issues Management Maintenance MOUs Between...

  10. POLICY GUIDANCE MEMORANDUM #29 Employment Offers Letters Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management | Department of Energy 9 Employment Offers Letters Performance Management POLICY GUIDANCE MEMORANDUM #29 Employment Offers Letters Performance Management This memorandum is to ensure compliance with DOE 0 331.lC, Employee Performance Management and Recognition Program, Section 4d {1)(d), and provide consistency throughout the Department in providing information to incoming employees on the applicability of the agency's performance management system. PDF icon POLICY GUIDANCE

  11. Fluor Hanford Integrated Safety Management System Phase 1 Verification 04/12/2000 Thru 04/28/2000 Volume 1 and 2

    SciTech Connect (OSTI)

    PARSONS, J.E.

    2000-03-01

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78).

  12. Recommended Practice for Patch Management of Control Systems

    SciTech Connect (OSTI)

    Steven Tom; Dale Christiansen; Dan Berrett

    2008-12-01

    A key component in protecting a nation’s critical infrastructure and key resources is the security of control systems. The term industrial control system refers to supervisory control and data acquisition, process control, distributed control, and any other systems that control, monitor, and manage the nation’s critical infrastructure. Critical Infrastructure and Key Resources (CIKR) consists of electric power generators, transmission systems, transportation systems, dam and water systems, communication systems, chemical and petroleum systems, and other critical systems that cannot tolerate sudden interruptions in service. Simply stated, a control system gathers information and then performs a function based on its established parameters and the information it receives. The patch management of industrial control systems software used in CIKR is inconsistent at best and nonexistent at worst. Patches are important to resolve security vulnerabilities and functional issues. This report recommends patch management practices for consideration and deployment by industrial control systems owners.

  13. Net Metering Policy Development and Distributed Solar Generation in Minnesota: Overview of Trends in Nationwide Policy Development and Implications of Increasing the Eligible System Size Cap

    SciTech Connect (OSTI)

    Doris, E.; Busche, S.; Hockett, S.

    2009-12-01

    The goal of the Minnesota net metering policy is to give the maximum possible encouragement to distributed generation assets, especially solar electric systems (MN 2008). However, according to a published set of best practices (NNEC 2008) that prioritize the maximum development of solar markets within states, the Minnesota policy does not incorporate many of the important best practices that may help other states transform their solar energy markets and increase the amount of grid-connected distributed solar generation assets. Reasons cited include the low system size limit of 40kW (the best practices document recommends a 2 MW limit) and a lack of language protecting generators from additional utility fees. This study was conducted to compare Minnesota's policies to national best practices. It provides an overview of the current Minnesota policy in the context of these best practices and other jurisdictions' net metering policies, as well as a qualitative assessment of the impacts of raising the system size cap within the policy based on the experiences of other states.

  14. Managing Aging Effects on Dry Cask Storage Systems for Extended...

    Office of Environmental Management (EM)

    dry cask storage system designs; and 4) AMPs and TLAAs for the SSCs that are important to safety in the DCSS designs. PDF icon Managing Aging Effects on Dry Cask Storage Systems...

  15. Integrated Safety & Environmental Management System | Stanford Synchrotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Lightsource Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation

  16. Freescale Semiconductor Successfully Implements an Energy Management System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Freescale Semiconductor Successfully Implements an Energy Management System The Superior Energy Performance (SEP) plant certifcation program is being tested through pilot projects, and one of the earliest participants was the Freescale Semiconductor Oak Hill Fab plant in Austin, Texas. Working with the Department of Energy's (DOE's) Industrial Technologies Program, the Oak Hill site implemented an energy management system in accor- dance with American National Standards Institute Management

  17. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  18. Process for Managing and Customizing HPC Operating Systems

    SciTech Connect (OSTI)

    Brown, David ML

    2014-04-02

    A process for maintaining a custom HPC operating system was developed at the Environmental Molecular Sciences Laboratory (EMSL) over the past ten years. This process is generic and flexible to manage continuous change as well as keep systems updated while managing communication through well defined pieces of software.

  19. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  20. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  1. Guidance for Fiscal Year 2015 Facilities Information Management System Data

    Office of Environmental Management (EM)

    Validations | Department of Energy Fiscal Year 2015 Facilities Information Management System Data Validations Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations PDF icon FIMS VALIDATION GUIDANCE_FY 2015 with MEMO 141120 FINAL.pdf More Documents & Publications Microsoft PowerPoint - FY09_10 Validations_Archiving_090804 Three-year Rolling Timeline Three

  2. Earned Value Management System (EVMS) Corrective Action Standard Operating

    Office of Environmental Management (EM)

    Procedure | Department of Energy Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as PM's primary reference for development of Corrective Action Requests (CARs) and Continuous Improvement Opportunities (CIOs), as well as the assessment of contractors procedures and implementation associated with

  3. Plant perspective on electronic document management systems for process safety management programs

    SciTech Connect (OSTI)

    Mannan, M.; Lee, W.S. [RMT/Jones and Neuse, Inc., Austin, TX (United States)

    1996-08-01

    As mandated by the Clean Air Act Amendments of 1990, the Occupational Safety and Health Administration (OSHA) promulgated on February 24, 1992 the Process Management (PSM) rule: 29 CFR 1910.119. Compliance with the PSM requirements is causing a significant impact on both financial resources and manpower for the covered facilities. A major portion of the efforts have been concentrated on developing and compiling a vast amount of data in various formats (i.e., autocad, word processing, and numeric databases). Because of the need to access and revise these data on a continuous basis, many facilities have started to implement computer-based document management systems to store, manage, and maintain these data. This paper provides a plant perspective of the necessary features and characteristics of a computer-based document management system. An electronic document management system can also form the basis for a plant workflow system. Once, all the information related to a plant`s PSM program are inputted into the system, it is possible to control the plant workflow using the management of change system and maintenance work requests. Other key issues that must be included in a computer-based system are redlining capabilities, execution of management of change authorization, and interfacing with existing computer programs (many plants are already using different kinds of software for a variety of objectives). This paper provides a roadmap for the development and implementation of an electronic document management system.

  4. Energy Management for Motor-Driven Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... areas of concern. n Informing plant manage- ment of ... operators and maintenance workers to be aware of the time of ... To be a smart shopper requires knowledge of your plant ...

  5. SES Performance Management System Plan Training | Department...

    Energy Savers [EERE]

    Executive Service Performance Management Training.pdf Responsible Contacts Ina Shaw HUMAN RESOURCES SPECIALIST E-mail ina.shaw@hq.doe.gov Phone 202-586-8464 More Documents &...

  6. "DOE O 450.2 INTEGRATED SAFETY MANAGEMENT AND DOE P 450.4A INTEGRATED SAFETY MANAGEMENT POLICY FAMILIAR LEVEL

    Broader source: Energy.gov [DOE]

    "The familiar level of this module is divided into two sections. In the first section, we will discuss the additions to DOE M 450.4-1, Integrated Safety Management System Manual, which has been...

  7. Microfabrication Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Polcies Booking Login Policy Cleanroom Policy Equipment Use Policy 2 Person Rule Experimental Hall Policy After Hours Policy

  8. Integrated Vehicle Thermal Management Systems (VTMS) Analysis/Modeling |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Systems (VTMS) Analysis/Modeling Integrated Vehicle Thermal Management Systems (VTMS) Analysis/Modeling 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. PDF icon vssp_02_thornton.pdf More Documents & Publications Integrated Vehicle Thermal Management Power Electronic Thermal System Performance and Integration Characterization and Development of Advanced Heat Transfer

  9. Computerized map-based information management system for natural resource management

    SciTech Connect (OSTI)

    Miller, K.

    1995-12-01

    Federal agencies, states and resource managers have control and stewardship responsibility over a significant inventory of natural resources. A number of federal regulations require the review, protection and preservation of natural resource protection. Examples of such actions include the reauthorization of the Clean Water Act and the modification of the National Contingency Plan to incorporate the requirements of the Oil Pollution Act of 1990. To successfully preserve conserve and restore natural resources on federal reservations, and state and private lands, and to comply with Federal regulations designed to protect natural resources located on their sites, and the type of information on these resources required by environmental regulations. This paper presents an approach using a computerized, graphical information management system to catalogue and track data for the management of natural resources under Federal and state regulations, and for promoting resource conservation, preservation and restoration. The system is designed for use by Federal facility resource managers both for the day-to-day management of resources under their control, and for the longer-term management of larger initiatives, including restoration of significant or endangered resources, participation in regional stewardship efforts, and general ecosystem management. The system will be valuable for conducting natural resource baseline inventories an implementing resource management plans on lands other than those controlled by the Federal government as well. The system can provide a method for coordinating the type of natural resource information required by major federal environmental regulations--thereby providing a cost-effective means for managing natural resource information.

  10. FACILITIES INFORMATION MANAGEMENT SYSTEM (FIMS) DATA VALIDATION GUIDANCE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FISCAL YEAR 2015 FACILITIES INFORMATION MANAGEMENT SYSTEM (FIMS) DATA VALIDATION GUIDANCE This document provides an acceptable, but not mandatory, means for complying with the FIMS verification requirements of DOE Order 430.1B, Real Property Asset Management. Alternate methods that satisfy the requirements of the Order are also acceptable. However, alternate implementation methods if selected must be justified and should be discussed with the Office of Acquisition and Project Management (OAPM)

  11. Earned Value Management System (EVMS) Surveillance Standard Operating Procedure

    Office of Environmental Management (EM)

    Surveillance Standard Operating Procedure (ESSOP) Issued by Office of Acquisition and Project Management MA-63 September 30, 2013 V2 DEPARTMENT OF ENERGY Office of Acquisition and Project Management (OAPM) EVMS SURVEILLANCE SOP (ESSOP) SEPTEMBER 30, 2013 ii Earned Value Management System (EVMS) Surveillance Standard Operating Procedure (ESSOP) OPR: MA-63 Update V2: September 30, 2013 1. PURPOSE. This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM

  12. Quality Management Systems for Zero Energy Ready Home Webinar (Text

    Energy Savers [EERE]

    Version) | Department of Energy Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Below is the text version of the webinar, Quality Management Systems for Zero Energy Ready Home, presented in October 2014. Watch the presentation. GoToWebinar voice: The broadcast is now starting. All attendees are in listen-only mode. Lindsay Parker: Hi, everyone. We're really glad that you can make it here

  13. Implementation of Department of Energy Oversight Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-09-15

    This Order provides direction for implementing Department of Energy (DOE) P 226.1, Department of Energy Oversight Policy, dated 6-10-05, which establishes DOE policy for assurance systems and processes established by DOE contractors and oversight programs performed by DOE line management and independent oversight organizations. Cancels DOE P 450.5. Canceled by DOE O 226.1A.

  14. Advanced Management of Compressed Air Systems

    Office of Energy Efficiency and Renewable Energy (EERE)

    Find out how a compressed air system works and the benefits of optimal compressed air system performance. This training is designed to help end users as well as industry solution providers learn...

  15. An evaluation of the management system verification pilot at Hanford

    SciTech Connect (OSTI)

    BRIGGS, C.R.

    1998-11-12

    The Chemical Management System (CMS), currently under development at Hanford, was used as the ''test program'' for pilot testing the value added aspects of the Chemical Manufacturers Association's (CMA) Management Systems Verification (MSV) process. The MSV process, which was developed by CMA's member chemical companies specifically as a tool to assist in the continuous improvement of environment, safety and health (ESH) performance, represents a commercial sector ''best practice'' for evaluating ESH management systems. The primary purpose of Hanford's MSV Pilot was to evaluate the applicability and utility of the MSV process in the Department of Energy (DOE) environment. However, because the Integrated Safety Management System (ISMS) is the framework for ESH management at Hanford and at all DOE sites, the pilot specifically considered the MSV process in the context of a possible future adjunct to Integrated Safety Management System Verification (ISMSV) efforts at Hanford and elsewhere within the DOE complex. The pilot involved the conduct of two-hour interviews with four separate panels of individuals with functional responsibilities related to the CMS including the Department of Energy Richland Operations (DOE-RL), Fluor Daniel Hanford (FDH) and FDH's major subcontractors (MSCS). A semi-structured interview process was employed by the team of three ''verifiers'' who directed open-ended questions to the panels regarding the development, integration and effectiveness of management systems necessary to ensure the sustainability of the CMS effort. An ''MSV Pilot Effectiveness Survey'' also was completed by each panel participant immediately following the interview.

  16. Information technology and innovative drainage management practices for selenium load reduction from irrigated agriculture to provide stakeholder assurances and meet contaminant mass loading policy objectives

    SciTech Connect (OSTI)

    Quinn, N.W.T.

    2009-10-15

    Many perceive the implementation of environmental regulatory policy, especially concerning non-point source pollution from irrigated agriculture, as being less efficient in the United States than in many other countries. This is partly a result of the stakeholder involvement process but is also a reflection of the inability to make effective use of Environmental Decision Support Systems (EDSS) to facilitate technical information exchange with stakeholders and to provide a forum for innovative ideas for controlling non-point source pollutant loading. This paper describes one of the success stories where a standardized Environmental Protection Agency (EPA) methodology was modified to better suit regulation of a trace element in agricultural subsurface drainage and information technology was developed to help guide stakeholders, provide assurances to the public and encourage innovation while improving compliance with State water quality objectives. The geographic focus of the paper is the western San Joaquin Valley where, in 1985, evapoconcentration of selenium in agricultural subsurface drainage water, diverted into large ponds within a federal wildlife refuge, caused teratogenecity in waterfowl embryos and in other sensitive wildlife species. The fallout from this environmental disaster was a concerted attempt by State and Federal water agencies to regulate non-point source loads of the trace element selenium. The complexity of selenium hydrogeochemistry, the difficulty and expense of selenium concentration monitoring and political discord between agricultural and environmental interests created challenges to the regulation process. Innovative policy and institutional constructs, supported by environmental monitoring and the web-based data management and dissemination systems, provided essential decision support, created opportunities for adaptive management and ultimately contributed to project success. The paper provides a retrospective on the contentious planning process and offers suggestions as to how the technical and institutional issues could have been resolved faster through early adoption of some of the core principles of sound EDSS design.

  17. NNSA's G2 Management Information System Wins Association for Enterprise

    National Nuclear Security Administration (NNSA)

    Information's (AFEI) "Excellence in Enterprise Information Award" | National Nuclear Security Administration G2 Management Information System Wins Association for Enterprise Information's (AFEI) "Excellence in Enterprise Information Award" | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering

  18. Nuclear Materials Management & Safeguards System | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Management & Safeguards System | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs

  19. Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FOR SECTION H | Department of Energy 71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H PDF icon Policy Flash - AL non-M&O Contractor Business Systems Clauses Section H.pdf PDF icon Acquisition Letter Business System Clauses August 2013.pdf More Documents & Publications Acquisition Letter No. AL 2013-11 POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11-

  20. Enforcement Policy Statement Regarding Walk-in Cooler/Walk-in Freezer Refrigeration Systems

    Broader source: Energy.gov [DOE]

    This policy is not currently in effect. If the Department of Energy receives recommended standards from the Appliance Standards and Rulemaking Advisory Committee within a specified time frame, DOE will not seek civil penalties or injunctive relief concerning violations of the four energy conservation standards applicable to dedicated condensing refrigeration systems operating at medium temperatures that are promulgated at 10 C.F.R. § 431.306(e).

  1. The Bureau of Land Management's Well Information System (WIS...

    Open Energy Info (EERE)

    Bureau of Land Management's Well Information System (WIS) How-To Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  2. Enterprise Assessments Targeted Review of the Safety System Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... The NPO iv safety system oversight representative's approach to oversight of the safety ... NPO 3.4.1.2.1, NS&E Issues Evaluation and Management Process, directs the use of a ...

  3. Energy.gov Content Management System Requirements and Guidance

    Broader source: Energy.gov [DOE]

    The Office of Energy Efficiency and Renewable Energy's (EERE's) websites are hosted in Energy.gov's Drupal content management system (CMS), which is maintained by the U.S. Department of Energy's Public Affairs Office.

  4. Building America Top Innovations 2013 Profile – Quality Management System Guidelines

    SciTech Connect (OSTI)

    none,

    2013-09-01

    This Top Innovation profile describes quality management system tools that were customized for residential construction by BSC, IBACOS, and PHI, for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework.

  5. Quality Management System Guidelines - Building America Top Innovation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Management System Guidelines - Building America Top Innovation Quality Management System Guidelines - Building America Top Innovation Effec guid-quality-mgnt.png The whole-building approach of constructing high performance homes requires a high degree of coordination and interdependencies between designers, builders, and trade partners to achieve energy efficiency goals, meet customer expectations, minimize risks for the builder, and avoid costly mistakes.

  6. Environmental Management System Steering Committee | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management System Steering Committee The Environmental Management System Steering Committee (EMSSC) is a standing Ames Laboratory committee that advises the members of the Laboratory's Executive Council on environmentally-related objects and targets to help meet the Laboratory's and DOE's sustainability goals. For more information please see http://www.ameslab.gov/operations/esha/environmental EMS Charter The current members of the committee include David Byrd (Science and

  7. Hybrid power management system and method - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vehicles and Fuels Vehicles and Fuels Energy Storage Energy Storage Electricity Transmission Electricity Transmission Find More Like This Return to Search Hybrid power management system and method National Aeronautics and Space Administration Contact NASA About This Technology Technology Marketing SummaryNASA Glenn Research Center (GRC) innovators have developed and patented a unique Hybrid Power Management (HPM) system, integrating diverse power devices in an optimal configuration for space and

  8. Energy.gov Content Management System Webforms | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Webforms Energy.gov Content Management System Webforms For Office of Energy Efficiency and Renewable Energy (EERE) websites, Energy.gov's content management system (CMS) has the ability to create webforms. Although webforms are technically easy to create, there are certain federal regulations-such as the Paperwork Reduction Act and Privacy Impact Assessment-to consider before you collect information from the general public. To review the process for adding webforms, log in to the CMS and go to

  9. Thermal Management of PHEV / EV Charging Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of PHEV / EV Charging Systems Thermal Management of PHEV / EV Charging Systems 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C. PDF icon ape029_bennion_2010_p.pdf More Documents & Publications Motor Thermal Control Integrated Vehicle Thermal Management Integration Technology for PHEV-Grid-Connectivity, with Support for SAE Electrical Standards

  10. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  11. Chemical Biological Emergency Management Information System

    Energy Science and Technology Software Center (OSTI)

    2004-06-15

    CB-EMIS is designed to provide information and analysis to transit system operators and emergency responders in the event of a chemical attack on a subway system. The software inforporates detector data, video images, train data, meteorological data, and above- and below-ground plume dispersion models, hight of the liquid level.

  12. Best Management Practice #8: Steam Boiler Systems

    Broader source: Energy.gov [DOE]

    Boilers and steam generators are commonly used in large heating systems, institutional kitchens, or in facilities where large amounts of process steam are used. This equipment consumes varying amounts of water depending on system size, the amount of steam used, and the amount of condensate returned.

  13. The Integrated Waste Tracking System - A Flexible Waste Management Tool

    SciTech Connect (OSTI)

    Anderson, Robert Stephen

    2001-02-01

    The US Department of Energy (DOE) Idaho National Engineering and Environmental Laboratory (INEEL) has fully embraced a flexible, computer-based tool to help increase waste management efficiency and integrate multiple operational functions from waste generation through waste disposition while reducing cost. The Integrated Waste Tracking System (IWTS)provides comprehensive information management for containerized waste during generation,storage, treatment, transport, and disposal. The IWTS provides all information necessary for facilities to properly manage and demonstrate regulatory compliance. As a platformindependent, client-server and Web-based inventory and compliance system, the IWTS has proven to be a successful tracking, characterization, compliance, and reporting tool that meets the needs of both operations and management while providing a high level of management flexibility.

  14. Policy Flash 2012-57

    Broader source: Energy.gov (indexed) [DOE]

    Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Communication to All Department of Energy Contractors SUMMARY:...

  15. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: OFPP Myth-busting 2 Memorandum SUMMARY: The Office of Federal...

  16. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    DATE: April 09, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  17. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    DATE: April 17, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  18. Policy Flash 2012-56

    Broader source: Energy.gov (indexed) [DOE]

    56 DATE: July 27, 2012 TO: Procurement Directors FROM: Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT:...

  19. Policy Flash 2012-66

    Broader source: Energy.gov (indexed) [DOE]

    September 19, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT:...

  20. An Integrated Waste Management System and a Consent-Based

    Office of Environmental Management (EM)

    An Integrated Waste Management System and a Consent-Based Approach to Siting Consent-Based Siting Initiative Kick-Off Meeting Renaissance Washington, DC Downtown Hotel January 20, 2016 1:00-1:15 PM Keynote Speaker: Finding Long-Term Solutions for Managing Our Nation's Nuclear Waste Dr. Lynn Orr, Undersecretary for Science and Energy, Department of Energy 1:15-1:50 PM Panel Discussion: Updates on DOE Planning for an Integrated Waste Management System and Discussion of Engagement Opportunities in

  1. Earned Value Management System (EVMS) Roadside Assist Visit. | Department

    Energy Savers [EERE]

    of Energy Earned Value Management System (EVMS) Roadside Assist Visit. Earned Value Management System (EVMS) Roadside Assist Visit. April 4, 2016 8:00AM EDT to April 7, 2016 5:00PM EDT On April 4-7, 2016, the Office of Project Management Oversight and Assessments (PM) will travel to Portsmouth, OH and West Valley NY, for meetings with Fluor-BWXT Portsmouth, LLC (FBP) and CH2M HILL- B&W West Valley, LLC (CHBWV) contractors. The purpose is to conduct Roadside Assist Visits in support of

  2. Requirements Management System Browser (RMSB) software design description

    SciTech Connect (OSTI)

    Frank, D.D.

    1996-09-30

    The purpose of this document is to provide an ``as-built`` design description for the Requirements Management System Browser (RMSB) application. The Graphical User Interface (GUI) and database structure design are described for the RMSB application, referred to as the ``Browser.`` The RMSB application provides an easy to use PC-based interface to browse systems engineering data stored and managed in a UNIX software application. The system engineering data include functions, requirements, and architectures that make up the Tank Waste Remediation System (TWRS) technical baseline.

  3. Small Water System Management Program: 100 K Area

    SciTech Connect (OSTI)

    Hunacek, G.S. Jr.

    1995-06-29

    Purposes of this document are: to provide an overview of the service and potable water system presently in service at the Hanford Site`s 100 K Area; to provide future system forecasts based on anticipated DOE activities and programs; to delineate performance, design, and operations criteria; and to describe planned improvements. The objective of the small water system management program is to assure the water system is properly and reliably managed and operated, and continues to exist as a functional and viable entity in accordance with WAC 246-290-410.

  4. Power Contro Energy Management and Market Systems

    SciTech Connect (OSTI)

    Tom Addison; Andrew Stanbury

    2005-12-15

    More efficient use of the nation's electrical energy infrastructure will result in minimizing the cost of energy to the end user. Using real time electrical market information coupled with defined rules, market opportunities can be identified that provide economic benefit for both users and marketers of electricity. This report describes the design of one such system and the features a fully functional system would provide. This report documents several investigated methods of controlling load diversity or shifting.

  5. Hybrid electric vehicle power management system

    DOE Patents [OSTI]

    Bissontz, Jay E.

    2015-08-25

    Level voltage levels/states of charge are maintained among a plurality of high voltage DC electrical storage devices/traction battery packs that are arrayed in series to support operation of a hybrid electric vehicle drive train. Each high voltage DC electrical storage device supports a high voltage power bus, to which at least one controllable load is connected, and at least a first lower voltage level electrical distribution system. The rate of power transfer from the high voltage DC electrical storage devices to the at least first lower voltage electrical distribution system is controlled by DC-DC converters.

  6. Best Management Practice #3: Distribution System Audits, Leak Detection,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Repair | Department of Energy 3: Distribution System Audits, Leak Detection, and Repair Best Management Practice #3: Distribution System Audits, Leak Detection, and Repair A distribution system audit, or leak detection and repair program, may help federal facilities identify and reduce water losses and be better stewards of water as a resource. Overview Federal facilities in large campuses with expansive distribution systems can lose a significant amount of total water production and

  7. Best Management Practice #8: Steam Boiler Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Steam Boiler Systems Best Management Practice #8: Steam Boiler Systems Steam boilers are commonly used in large heating systems, institutional kitchens, or in facilities where large amounts of process steam are used. This equipment consumes varying amounts of water depending on system size and the amount of condensate returned. Operations and Maintenance Options To maintain water efficiency in operations and maintenance, federal agencies should do the following. Develop and implement a

  8. Statistical tools for prognostics and health management of complex systems

    SciTech Connect (OSTI)

    Collins, David H; Huzurbazar, Aparna V; Anderson - Cook, Christine M

    2010-01-01

    Prognostics and Health Management (PHM) is increasingly important for understanding and managing today's complex systems. These systems are typically mission- or safety-critical, expensive to replace, and operate in environments where reliability and cost-effectiveness are a priority. We present background on PHM and a suite of applicable statistical tools and methods. Our primary focus is on predicting future states of the system (e.g., the probability of being operational at a future time, or the expected remaining system life) using heterogeneous data from a variety of sources. We discuss component reliability models incorporating physical understanding, condition measurements from sensors, and environmental covariates; system reliability models that allow prediction of system failure time distributions from component failure models; and the use of Bayesian techniques to incorporate expert judgments into component and system models.

  9. Lighting system with thermal management system having point contact synthetic jets

    DOE Patents [OSTI]

    Arik, Mehmet; Weaver, Stanton Earl; Kuenzler, Glenn Howard; Wolfe, Jr., Charles Franklin; Sharma, Rajdeep

    2013-12-10

    Lighting system having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system includes a plurality of synthetic jets. The synthetic jets are arranged within the lighting system such that they are secured at contact points.

  10. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  11. Subsurface materials management and containment system

    DOE Patents [OSTI]

    Nickelson, Reva A.; Richardson, John G.; Kostelnik, Kevin M.; Sloan, Paul A.

    2006-10-17

    Systems, components, and methods relating to subterranean containment barriers. Laterally adjacent tubular casings having male interlock structures and multiple female interlock structures defining recesses for receiving a male interlock structure are used to create subterranean barriers for containing and treating buried waste and its effluents. The multiple female interlock structures enable the barriers to be varied around subsurface objects and to form barrier sidewalls. The barrier may be used for treating and monitoring a zone of interest.

  12. Subsurface materials management and containment system

    DOE Patents [OSTI]

    Nickelson, Reva A.; Richardson, John G.; Kosteinik, Kevin M.; Sloan, Paul A.

    2004-07-06

    Systems, components, and methods relating to subterranean containment barriers. Laterally adjacent tubular casings having male interlock structures and multiple female interlock structures defining recesses for receiving a male interlock structure are used to create subterranean barriers for containing and treating buried waste and its effluents. The multiple female interlock structures enable the barriers to be varied around subsurface objects and to form barrier sidewalls. The barrier may be used for treating and monitoring a zone of interest.

  13. Integrated Distribution Management System for Alabama Principal Investigator

    SciTech Connect (OSTI)

    Schatz, Joe

    2013-03-31

    Southern Company Services, under contract with the Department of Energy, along with Alabama Power, Alstom Grid (formerly AREVA T&D) and others moved the work product developed in the first phase of the Integrated Distribution Management System (IDMS) from “Proof of Concept” to true deployment through the activity described in this Final Report. This Project – Integrated Distribution Management Systems in Alabama – advanced earlier developed proof of concept activities into actual implementation and furthermore completed additional requirements to fully realize the benefits of an IDMS. These tasks include development and implementation of a Distribution System based Model that enables data access and enterprise application integration.

  14. An Experimental Metagenome Data Management and AnalysisSystem

    SciTech Connect (OSTI)

    Markowitz, Victor M.; Korzeniewski, Frank; Palaniappan, Krishna; Szeto, Ernest; Ivanova, Natalia N.; Kyrpides, Nikos C.; Hugenholtz, Philip

    2006-03-01

    The application of shotgun sequencing to environmental samples has revealed a new universe of microbial community genomes (metagenomes) involving previously uncultured organisms. Metagenome analysis, which is expected to provide a comprehensive picture of the gene functions and metabolic capacity of microbial community, needs to be conducted in the context of a comprehensive data management and analysis system. We present in this paper IMG/M, an experimental metagenome data management and analysis system that is based on the Integrated Microbial Genomes (IMG) system. IMG/M provides tools and viewers for analyzing both metagenomes and isolate genomes individually or in a comparative context.

  15. Information security management system planning for CBRN facilities

    SciTech Connect (OSTI)

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.; Glantz, Clifford S.; Landine, Guy P.; Bryant, Janet L.; Lewis, John; Mathers, Gemma; Rodger, Robert; Johnson, Christopher

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  16. Heating System Modernization, Management of Peripheral Scope Lessons

    Broader source: Energy.gov (indexed) [DOE]

    Learned Report, NNSA, Dec 2010 | Department of Energy 393 Heating System Modernization (HSM) TA-1 Management of Peripheral Scope Lessons Learned Report Dec 2010.pdf More Documents & Publications Improving Steam System Performance: A Sourcebook for Industry, Second Edition Inspection, Sandia National Laboratories - April 2008 Independent Oversight Inspection, Sandia National Laboratories, Summary Report - February 2003

  17. Drought management and its impact on public water systems

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This volume represents the report on a colloquium sponsored by the National Research Council's Water Science and Technology Board, 5 September 1985. It includes five background papers on drought, drought management, risks for public systems, and legal and institutional aspects, plus appendices on conservation and rationing plans for Los Angeles and Salt Lake County. The conclusions of the volume include: (1) there is substantial need for continued research on drought and its impact on the management of public water systems; (2) sizing of the physical facilities of a system should not be based solely on full-service requirements during the drought of record, nor should such facilities be sized by the arbitrary specification of hydrologic risk; and (3) the key to adequate drought management of public water systems lies in predrought preparation.

  18. WIPP Documents - Environmental Management and Sustainability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Sustainability WIPP Environmental Policy DOE/WIPP 04-3310 Rev 5 Environmental Management System Description DOE/WIPP-05-3318 Rev 5 WIPP Site Sustainability Plan DOE/WIPP-14-3542 WIPP Environmental Targets

  19. ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS PROGRESS CY2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Objectives & Targets Rev. 1.2, 8/29/2014 Page 1 of 3 ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS PROGRESS CY2014 for SOUTHWESTERN POWER ADMINISTRATION Activity Legal Requirement Aspect Objective Target** see important note 2014 Target Achievements Real Estate Management DOE O 436.1 E.O. 13423 & 13514 EPAct 1992 and 2005 EISA 2007 NECPA 1978 Natural resource depletion and GHG emissions from resource intensive facilities Increase sustainability of facility resources, reduce

  20. Energy Management Systems Package for Small Commercial Buildings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EnMS (energy management systems) Package for Small Commercial Buildings Jessica Granderson Lawrence Berkeley National Laboratory JGranderson@lbl.gov 510.486.6792 April 4, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: Small commercial buildings present two challenges for implementing energy efficiency strategies 1) high transaction cost relative to total savings 2) lack of personnel time or skill available for energy management Objective:

  1. Periodicals collection management using a decision support system

    SciTech Connect (OSTI)

    Compton, M.L.; Moser, E.C.

    1993-12-31

    Sandia National Laboratories is a multiprogram national laboratory established in 1949. The Library currently uses DOBIS for its automated system, including the Periodicals Control function for periodical check-in. DOBIS performs processing and control functions adequately, but could not meet our reporting needs. Therefore the Library`s Periodicals Decision Team decided that they needed another ``system`` for collection management. A Periodicals Decision Support System was created using information downloaded from DOBIS and uploaded into dBASE IV. The Periodical Decision Support System functions as an information-processing system that has aided us in making collection management decisions for periodicals. It certainly allows us to do interactive ad-hoc analysis; although there are no modeling tools currently incorporated in the system. We hope that these modeling tools will come later. We have been gathering information and developing needed reports to achieve this goal.

  2. New system reduces sludge management costs

    SciTech Connect (OSTI)

    Roll, R.R. ); Koser, M.R. )

    1993-06-01

    This article describes a recently completed a $2.7-million project to upgrade the sludge dewatering and stabilizing system at a 48-mgd wastewater treatment facility in Niagara Fall, New York. The work was necessitated by the deteriorated condition of the plant's original vacuum filters and increasing costs to landfill the dewatered sludge. The new equipment has restored sludge production capacity while reducing the final material's moisture content. The Niagara Falls plant is one of the few municipal physical-chemical treatment plants built in this country, and is the largest still functioning. Constructed in the mid-1970s, it was designed to treat a combination of domestic sewage and industrial wastes. One third of the flow and one half of the solids are industrial in nature. The changes made reduced electrical power consumption and sanitary landfill costs.

  3. Patch and Update Management Program for Energy Delivery Systems

    Energy Savers [EERE]

    Patch and Update Management Program for Energy Delivery Systems A simplified process of patching and updating energy delivery system devices for end users and equipment vendors Background The energy sector places an emphasis on the availability and reliability of energy delivery operations. While best practice avoids the connection of energy delivery system devices to external networks, their increasing interconnectivity poses greater risk to cyber vulnerabilities. Proper and timely patches and

  4. Adding Data Management Services to Parallel File Systems

    SciTech Connect (OSTI)

    Brandt, Scott

    2015-03-04

    The objective of this project, called DAMASC for “Data Management in Scientific Computing”, is to coalesce data management with parallel file system management to present a declarative interface to scientists for managing, querying, and analyzing extremely large data sets efficiently and predictably. Managing extremely large data sets is a key challenge of exascale computing. The overhead, energy, and cost of moving massive volumes of data demand designs where computation is close to storage. In current architectures, compute/analysis clusters access data in a physically separate parallel file system and largely leave it scientist to reduce data movement. Over the past decades the high-end computing community has adopted middleware with multiple layers of abstractions and specialized file formats such as NetCDF-4 and HDF5. These abstractions provide a limited set of high-level data processing functions, but have inherent functionality and performance limitations: middleware that provides access to the highly structured contents of scientific data files stored in the (unstructured) file systems can only optimize to the extent that file system interfaces permit; the highly structured formats of these files often impedes native file system performance optimizations. We are developing Damasc, an enhanced high-performance file system with native rich data management services. Damasc will enable efficient queries and updates over files stored in their native byte-stream format while retaining the inherent performance of file system data storage via declarative queries and updates over views of underlying files. Damasc has four key benefits for the development of data-intensive scientific code: (1) applications can use important data-management services, such as declarative queries, views, and provenance tracking, that are currently available only within database systems; (2) the use of these services becomes easier, as they are provided within a familiar file-based ecosystem; (3) common optimizations, e.g., indexing and caching, are readily supported across several file formats, avoiding effort duplication; and (4) performance improves significantly, as data processing is integrated more tightly with data storage. Our key contributions are: SciHadoop which explores changes to MapReduce assumption by taking advantage of semantics of structured data while preserving MapReduce’s failure and resource management; DataMods which extends common abstractions of parallel file systems so they become programmable such that they can be extended to natively support a variety of data models and can be hooked into emerging distributed runtimes such as Stanford’s Legion; and Miso which combines Hadoop and relational data warehousing to minimize time to insight, taking into account the overhead of ingesting data into data warehousing.

  5. POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non...

    Energy Savers [EERE]

    POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H - Earned Value Management Clause...

  6. Laboratory information management system at the Hanford Site

    SciTech Connect (OSTI)

    Leggett, W.; Barth, D.; Ibsen, T.; Newman, B.

    1994-03-01

    In January of 1994 an important new technology was brought on line to help in the monumental waste management and environmental restoration work at the Hanford Site. Cleanup at the Hanford Site depends on analytical chemistry information to identify contaminates, design and monitor cleanup processes, assure worker safety, evaluate progress, and prove completion. The new technology, a laboratory information management system (LIMS) called ``LABCORE,`` provides the latest systems to organize and communicate the analytical tasks: track work and samples; collect and process data, prepare reports, and store data in readily accessible electronic form.

  7. Meeting Minutes from Automated Home Energy Management System Expert Meeting

    Energy Savers [EERE]

    Automated Home Energy Management System Expert Meeting October 1-2, 2009 AGENDA - Day 1 8:30 - 8:45 Welcome and Debriefing of Building America and Home Energy Management Research- Lew Pratsch, DOE 8:45 - 9:15 Utilities Trends- Smart Grid Projects and Integration With Home Controls - Mike Keesee, SMUD 9:15 - 9:45 Thoughts on Controls System Performance Requirements - Rich Brown, LBL 9:45 - 10:15 Efficiency Trends in Consumer Electronics - Kurtis McKenney, TIAX 10:15 - 10:30 Session Break 10:30 -

  8. Alarm Management System for the D/3 Distributed Control System

    Energy Science and Technology Software Center (OSTI)

    1997-03-19

    As industrial processes continue to grow in size and complexity, the Distrubuted Control Systems that automate and monitor these processes expand in a like manner. This increase in control system complexity has resulted in ever increasing numbers of alarms presented to the operator. The challenge for today's control system designer is to find innovative ways to present alarm information to the operator such that despite the large number of alarms, the operator is able tomore » quickly assess the status of the plant and immediately respond to the most critical alarms in a timely manner. This software package, designed and developed for the Savannah River Site Replacement High Level Waste Evaporator/Waste Removal Distributed Control System installed on the H-Area Tank Farm, provides an alarm system which utilizes the annunciator (SKID) panel as a means of statusing the plant and providing single keystroke access to the display on which an alarm resides.« less

  9. Supplying the nuclear arsenal: Production reactor technology, management, and policy, 1942--1992

    SciTech Connect (OSTI)

    Carlisle, R.P.; Zenzen, J.M.

    1994-01-01

    This book focuses on the lineage of America`s production reactors, those three at Hanford and their descendants, the reactors behind America`s nuclear weapons. The work will take only occasional sideways glances at the collateral lines of descent, the reactor cousins designed for experimental purposes, ship propulsion, and electric power generation. Over the decades from 1942 through 1992, fourteen American production reactors made enough plutonium to fuel a formidable arsenal of more than twenty thousand weapons. In the last years of that period, planners, nuclear engineers, and managers struggled over designs for the next generation of production reactors. The story of fourteen individual machines and of the planning effort to replace them might appear relatively narrow. Yet these machines lay at the heart of the nation`s nuclear weapons complex. The story of these machines is the story of arming the winning weapon, supplying the nuclear arms race. This book is intended to capture the history of the first fourteen production reactors, and associated design work, in the face of the end of the Cold War.

  10. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 DATE: February 12, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H - Earned Value Management Clause SUMMARY: The attached Acquisition Letter (AL) 2013-11 (originally released in Policy Flash 2013-71 on August 5, 2013) revises one Section H Clause -

  11. Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).

    SciTech Connect (OSTI)

    Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

    2004-11-01

    Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

  12. Examining the effectiveness of municipal solid waste management systems: An integrated cost-benefit analysis perspective with a financial cost modeling in Taiwan

    SciTech Connect (OSTI)

    Weng, Yu-Chi; Fujiwara, Takeshi

    2011-06-15

    In order to develop a sound material-cycle society, cost-effective municipal solid waste (MSW) management systems are required for the municipalities in the context of the integrated accounting system for MSW management. Firstly, this paper attempts to establish an integrated cost-benefit analysis (CBA) framework for evaluating the effectiveness of MSW management systems. In this paper, detailed cost/benefit items due to waste problems are particularly clarified. The stakeholders of MSW management systems, including the decision-makers of the municipalities and the citizens, are expected to reconsider the waste problems in depth and thus take wise actions with the aid of the proposed CBA framework. Secondly, focusing on the financial cost, this study develops a generalized methodology to evaluate the financial cost-effectiveness of MSW management systems, simultaneously considering the treatment technological levels and policy effects. The impacts of the influencing factors on the annual total and average financial MSW operation and maintenance (O and M) costs are analyzed in the Taiwanese case study with a demonstrative short-term future projection of the financial costs under scenario analysis. The established methodology would contribute to the evaluation of the current policy measures and to the modification of the policy design for the municipalities.

  13. Computerized management report system for monitoring manpower and cost

    SciTech Connect (OSTI)

    Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

    1980-04-01

    Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures.

  14. Federal policies to promote the widespread utilization of photovoltaic systems. Supplement: review and critique

    SciTech Connect (OSTI)

    Smith, J.L.

    1980-04-15

    This document is intended as a supplement to the two-volume report entitled Federal Policies to Promote the Widespread Utilization of Photovoltaic Systems that was submitted to Congress by the Department of Energy in February and April of 1980. This supplement contains review comments prepared by knowledgeable experts who reviewed early drafts of the Congressional report. Responses to the review comments by the Jet Propulsion Laboratory, preparer of the Congressional report, are also included in this supplement. The Congressional report, mandated in the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (P.L. 95-590), discusses various issues related to promoting the deployment of photovoltaic systems through the Federal Photovoltaic Program. Various program strategies and funding levels are examined.

  15. High Level Waste Management Division . H L W System Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    . H L W System Plan Revision 1 (U) Westinghouse Savannah River Company Aiken, South Carolina . August 4, 1993 1.0 2.0 3.0 4.0 5.0 6.0 HLW System Plan - Revision 1 (U) Table of Contents Mission Statement Purpose Executive Summary 3.1 Reference Date 3.2 Key Milestones 3.3 Operational Plan Summary 3.4 Key Issues and Assumptions 3.5 HLW System Plan Management .HLW System Description Principles and Guidelines 5.1 Safety Documentation 5.2 Regulatory Permits 5.3 Long Range Planning 5.4 Roadmaps 5.5 DOE

  16. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect (OSTI)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  17. Nuclear Materials Management and Safeguards System Reporting and Data Submission

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-02-10

    The manual provides clear and detailed instructions and procedures for documenting and reporting data submissions for nuclear materials transactions, inventories, and material balances to the Nuclear Materials Management and Safeguards System (NMMSS). Cancels DOE 5633.3B. Canceled by DOE M 474.1-2A.

  18. Product Lifecycle Management Architecture: A Model Based Systems Engineering Analysis.

    SciTech Connect (OSTI)

    Noonan, Nicholas James

    2015-07-01

    This report is an analysis of the Product Lifecycle Management (PLM) program. The analysis is centered on a need statement generated by a Nuclear Weapons (NW) customer. The need statement captured in this report creates an opportunity for the PLM to provide a robust service as a solution. Lifecycles for both the NW and PLM are analyzed using Model Based System Engineering (MBSE).

  19. Energy storage management system with distributed wireless sensors

    DOE Patents [OSTI]

    Farmer, Joseph C.; Bandhauer, Todd M.

    2015-12-08

    An energy storage system having a multiple different types of energy storage and conversion devices. Each device is equipped with one or more sensors and RFID tags to communicate sensor information wirelessly to a central electronic management system, which is used to control the operation of each device. Each device can have multiple RFID tags and sensor types. Several energy storage and conversion devices can be combined.

  20. Notice of Intent to Revise DOE G 414.1-1B, Management and Independent Assessments Guide for Use with 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-18

    This memorandum provides justification for revising DOE G 414.1-1B, Management and Independent Assessments Guide for Use With 10 CFR, Part 830, Subpart A, and DOE O 414.1C, Quality Assurance; DOE M 450.4-1, Integrated Safety Management System Manual; and DOE O 226.1A, Implementation of Department of Energy Oversight Policy.

  1. Freescale Semiconductor Successfully Implements an Energy Management System

    SciTech Connect (OSTI)

    2011-06-30

    Through the Superior Energy Performance (SEP) plant certification program, Freescale Semiconductor implemented projects at the company's Oak Hill Fab plant that reduced annual energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year. The plant is now certified at the SEP silver level, and has a management system in place to proactively manage the facility's energy resources in the future.

  2. DOE-RL Integrated Safety Management System Description

    SciTech Connect (OSTI)

    SHOOP, D.S.

    2000-09-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  3. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect (OSTI)

    Holland, Robert C.

    2010-02-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  4. Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization

    SciTech Connect (OSTI)

    Wang, Jianhui

    2015-09-01

    This report describes the application functions for distribution management systems (DMS). The application functions are those surveyed by the IEEE Power and Energy Society’s Task Force on Distribution Management Systems. The description of each DMS application includes functional requirements and the key features and characteristics in current and future deployments, as well as a summary of the major benefits provided by each function to stakeholders — from customers to shareholders. Due consideration is paid to the fact that the realizable benefits of each function may differ by type of utility, whether investor-owned, cooperative, or municipal. This report is sufficient to define the functional requirements of each application for system procurement (request-for-proposal [RFP]) purposes and for developing preliminary high-level use cases for those functions. However, it should not be considered a design document that will enable a vendor or software developer to design and build actual DMS applications.

  5. Concept of Operations for Real-time Airborne Management System

    SciTech Connect (OSTI)

    Barr, Jonathan L.; Taira, Randal Y.; Orr, Heather M.

    2013-03-04

    The purpose of this document is to describe the operating concepts, capabilities, and benefits of RAMS including descriptions of how the system implementations can improve emergency response, damage assessment, task prioritization, and situation awareness. This CONOPS provides general information on operational processes and procedures required to utilize RAMS, and expected performance benefits of the system. The primary audiences for this document are the end users of RAMS (including flight operators and incident commanders) and the RAMS management team. Other audiences include interested offices within the Department of Homeland Security (DHS), and officials from other state and local jurisdictions who want to implement similar systems.

  6. Nexus: a modular workflow management system for quantum simulation codes

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Krogel, Jaron T.

    2015-08-24

    The management of simulation workflows is a significant task for the individual computational researcher. Automation of the required tasks involved in simulation work can decrease the overall time to solution and reduce sources of human error. A new simulation workflow management system, Nexus, is presented to address these issues. Nexus is capable of automated job management on workstations and resources at several major supercomputing centers. Its modular design allows many quantum simulation codes to be supported within the same framework. Current support includes quantum Monte Carlo calculations with QMCPACK, density functional theory calculations with Quantum Espresso or VASP, and quantummore » chemical calculations with GAMESS. Users can compose workflows through a transparent, text-based interface, resembling the input file of a typical simulation code. A usage example is provided to illustrate the process.« less

  7. Distributed Solar PV for Electricity System Resiliency: Policy and Regulatory Considerations (Brochure), NREL (National Renewable Energy Laboratory)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PV FOR ELECTRICITY SYSTEM RESILIENCY POLICY AND REGULATORY CONSIDERATIONS ABSTRACT Distributed solar photovoltaic (PV) systems have the potential to supply electricity during grid outages resulting from extreme weather or other emergency situations. As such, distributed PV can signifcantly increase the resiliency of the electricity system. In order to take advantage of this capability, however, the PV systems must be designed with resiliency in mind and combined with other technologies, such as

  8. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  9. Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2

    SciTech Connect (OSTI)

    CARTER, R.P.

    2000-04-04

    DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

  10. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies and Procedures Policies and Procedures Fermi Project Management EVMS Policy/Procedures EVMS Certified System Documents OPSS Guidance # Description Desktop Instructions Policy FRA Earned Value Management Description EVMS Certification Letter EVM Processes Using Flow Diagrams and Visuals 12.PM-001 Project WBS, OBS, RAM 12.PM-002 Control Accounts, Work Packages, Planning Packages 12.PM-002.DT-02 - Sale of Special Process Spares 12.PM-003 Work Authorization 12.PM-004 Project Scheduling

  11. DOE-RL Integrated Safety Management System Program Description

    SciTech Connect (OSTI)

    SHOOP, D.S.

    2000-06-29

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight.

  12. Energy implications of integrated solid waste management systems. Final report

    SciTech Connect (OSTI)

    Little, R.E.; McClain, G.; Becker, M.; Ligon, P.; Shapiro, K.

    1994-07-01

    This study develops estimates of energy use and recovery from managing municipal solid waste (MSW) under various collection, processing, and disposal scenarios. We estimate use and recovery -- or energy balance -- resulting from MSW management activities such as waste collection, transport, processing, and disposal, as well as indirect use and recovery linked to secondary materials manufacturing using recycled materials. In our analysis, secondary materials manufacturing displaces virgin materials manufacturing for 13 representative products. Energy implications are expressed as coefficients that measure the net energy saving (or use) of displacing products made from virgin versus recycled materials. Using data developed for the 1992 New York City Master Plan as a starting point, we apply our method to an analysis of various collection systems and 30 types of facilities to illustrate bow energy balances shift as management systems are modified. In sum, all four scenarios show a positive energy balance indicating the energy and advantage of integrated systems versus reliance on one or few technology options. That is, energy produced or saved exceeds the energy used to operate the solid waste system. The largest energy use impacts are attributable to processing, including materials separation and composting. Collection and transportation energy are relatively minor contributors. The largest two contributors to net energy savings are waste combustion and energy saved by processing recycled versus virgin materials. An accompanying spatial analysis methodology allocates energy use and recovery to New York City, New York State outside the city, the U.S., and outside the U.S. Our analytical approach is embodied in a spreadsheet model that can be used by energy and solid waste analysts to estimate impacts of management scenarios at the state and substate level.

  13. International Border Management Systems (IBMS) Program : visions and strategies.

    SciTech Connect (OSTI)

    McDaniel, Michael; Mohagheghi, Amir Hossein

    2011-02-01

    Sandia National Laboratories (SNL), International Border Management Systems (IBMS) Program is working to establish a long-term border security strategy with United States Central Command (CENTCOM). Efforts are being made to synthesize border security capabilities and technologies maintained at the Laboratories, and coordinate with subject matter expertise from both the New Mexico and California offices. The vision for SNL is to provide science and technology support for international projects and engagements on border security.

  14. Energy Management and Information Systems, BBA Technical Team

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Management and Information Systems, BBA Technical Team 2014 Building Technologies Office Peer Review Hourly to 15-min interval meter data mete r mete r mete r Communicatio n hardware EIS server, data analysis & storage Web-based user access Weather data, energy price Jessica Granderson, JGranderson@lbl.gov Lawrence Berkeley National Laboratory Project Summary Timeline: Start date: October 2012 Planned end date: Ongoing BBA Tech Team Key Milestones 1. EIS costs and benefits study

  15. UNCLASSIFIED UNCLASSIFIED Nuclear Materials Management & Safeguards System

    National Nuclear Security Administration (NNSA)

    UNCLASSIFIED Nuclear Materials Management & Safeguards System CONTACT INFORMATION UPDATE REPORTING IDENTIFICATION SYMBOL (RIS) RIS: Address: Facility Name: CONTACTS Name Email: Phone/Fax Name Email: Phone/Fax Name Email: Phone/Fax Name Email: Phone/Fax Return Via Mail To: U.S Department Of Energy ATTN: NMMSS Staff NA-73, GTN 1000 Independence Avenue, SW Washington, DC 20585-1290 Return Via Fax To: 301-903-1998 Return Via E-Mail To: NMMSS@nnsa.doe.gov

  16. NERSC Data Management Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the Science Gateways page. Science Gateways For more complex collaborative data, analytics, and computing projects, NERSC promotes building scientific web apps that...

  17. Program Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program Management Safety Safety The Office of Environmental Management's (EM) top priority is to ensure proper implementation and continuous improvement of Integrated Safety Management Systems (ISMS) in the EM complex and to serve as a focal point for EM safety standards and policy development and interpretation and interfaces with internal/external oversight organizations Read more Acquisition Acquisition The Office of Environmental Management strives to assure effective project,

  18. Personal Property Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Personal Property Policy Personal Property Policy Personal Property Policy The DOE Personal Property Policy Division is responsible for development and oversight of the Department's personal property management program; establishes policies, standards, and guidance in accordance with applicable laws, regulations and sound personal property management practices and standards. Additionally MA-653: Advises and provides staff assistance to headquarters and field organizations that perform personal

  19. Enforcement Policy Statement Regarding Walk-in Cooler/Walk-in Freezer Refrigeration Systems

    Office of Environmental Management (EM)

    August 14, 2015 NOTE: This policy is not currently in effect. As noted below, this policy will become effective only if the requirements in section (2) below are satisfied. ASRAC has established a working group to engage in negotiations regarding the rulemaking described below. Therefore, section (2) specifies that the policy will become effective if the Department of Energy receives recommended standards from ASRAC within a specified time frame. We will update this website to alert the public

  20. Policy and Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance Policy and Guidance Strategic directions are influenced by an analysis of budget and workforce projections and plans, congressional mandates, administration goals, Departmental priorities and mission needs. Human capital management strategies, policy, programs and plans are developed and assessed for overall success and compliance with merit system principals, civil service laws and regulations, and Departmental HCM directives. OCHCO is the primary representative body for the Department

  1. Tank Waste Remediation Systems (TWRS) Configuration Management Implementation Plan

    SciTech Connect (OSTI)

    WEIR, W.R.

    2000-12-18

    The Tank Waste Configuration Management (TWRS) Configuration Management Implementation Plan descibes the execution of the configuration management (CM) that the contractor uses to manage and integrate its programmatic and functional operations to perform work.

  2. Biology and management of insect pests in North American intensively managed hardwood forest systems.

    SciTech Connect (OSTI)

    Coyle, David R.; Nebeker, T., E.; Hart, E., R.; Mattson, W., J.

    2005-01-01

    Annu. Rev. Entomol. 50:1-29. Abstract Increasing demand for wood and wood products is putting stress on traditional forest production areas, leading to long-term economic and environmental concerns. Intensively managed hardwood forest systems (IMHFS), grown using conventional agricultural as well as forestry methods, can help alleviate potential problems in natural forest production areas. Although IMHFS can produce more biomass per hectare per year than natural forests, the ecologically simplified, monocultural systems may greatly increase the crops susceptibility to pests. Species in the genera Populus and Salix comprise the greatest acreage in IMHFS in North America, but other species, including Liquidambar styracifua and Platanus occidentalis, are also important. We discuss life histories, realized and potential damage, and management options for the most economically infuential pests that affect these hardwood species. The substantial inherent challenges associated with pest management in the monocultural environments created by IMHFS are reviewed. Finally, we discuss ways to design IMHFS that may reduce their susceptibility to pests, increase their growth and productivity potential, and create a more sustainable environment.

  3. Coastal zone energy management: a multidisciplinary approach for the integration of solar electric systems with Florida's power generation system

    SciTech Connect (OSTI)

    Camejo, N.

    1983-12-01

    In order for Florida to ''accomplish effective coastal land management, it must have a comprehensive statewide approach closely relating land and water management development decisions in Florida must be made with understanding of the proposed development effects on the state's water resources''. This approach is very sensible in view of the issues raised in the introduction. Whether a power plant is sited inland or on the coast has tremendous implications for water use. Offshore siting of power plants is an alternative which should be carefully evaluated using CZEM. Of particular importance is the existence of renewable energy sources, such as OTEC, Wind and Ocean current, in the offshore areas of Florida. Many Solar Electric options could be sited in the coastal and offshore areas. The main technological problem associated with offshore power plants is the transmission of the electricity to shore. The solution to this problem may be using Hydrogen as an intermediary energy carrier. The use of Solar Electric Systems would be consistent with the policy to diversify the generation mix. If Florida is called upon to develop its offshore energy resources in the national interest, the use of CZEM would allow decision makers to make more environmentally sensitive decisions. This would allow the balancing of energy production and environmental quality.

  4. ETA-HTP12 - Evaluation of Hybrid Vehicle Energy Management System(s) [EMS]

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HTP12 Revision 0 Effective May 1, 2004 Evaluation of Hybrid Vehicle Energy Management System(s) [EMS] Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Roberta Brayer Approved by: ______________________________________________ Date: _______________ Donald Karner Procedure ETA-HTP12 Revision 0 ď›™2004 Electric Transportation Applications All Rights Reserved i TABLE OF CONTENTS 1. Objective 1 2. Purpose 1 3. Documentation 1 4.

  5. TO: Procurement Directors FROM: Director, Policy Division

    Broader source: Energy.gov (indexed) [DOE]

    4 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT:...

  6. System and method for acquisition management of subject position information

    DOE Patents [OSTI]

    Carrender, Curt

    2005-12-13

    A system and method for acquisition management of subject position information that utilizes radio frequency identification (RF ID) to store position information in position tags. Tag programmers receive position information from external positioning systems, such as the Global Positioning System (GPS), from manual inputs, such as keypads, or other tag programmers. The tag programmers program each position tag with the received position information. Both the tag programmers and the position tags can be portable or fixed. Implementations include portable tag programmers and fixed position tags for subject position guidance, and portable tag programmers for collection sample labeling. Other implementations include fixed tag programmers and portable position tags for subject route recordation. Position tags can contain other associated information such as destination address of an affixed subject for subject routing.

  7. System and method for acquisition management of subject position information

    DOE Patents [OSTI]

    Carrender, Curt

    2007-01-23

    A system and method for acquisition management of subject position information that utilizes radio frequency identification (RF ID) to store position information in position tags. Tag programmers receive position information from external positioning systems, such as the Global Positioning System (GPS), from manual inputs, such as keypads, or other tag programmers. The tag programmers program each position tag with the received position information. Both the tag programmers and the position tags can be portable or fixed. Implementations include portable tag programmers and fixed position tags for subject position guidance, and portable tag programmers for collection sample labeling. Other implementations include fixed tag programmers and portable position tags for subject route recordation. Position tags can contain other associated information such as destination address of an affixed subject for subject routing.

  8. Trends in Energy Management Technology - Part 4: Review ofAdvanced Applications in Energy Management, Control, and InformationSystems

    SciTech Connect (OSTI)

    Yee, Gaymond; Webster, Tom

    2003-08-01

    In this article, the fourth in a series, we provide a review of advanced applications in Energy Management, Control, and Information Systems (EMCIS). The available features for these products are summarized and analyzed with regard to emerging trends in EMCIS and potential benefits to the Federal sector. The first article [1] covered enabling technologies for emerging energy management systems. The second article [2] serves as a basic reference for building control system (BCS) networking fundamentals and includes an assessment of current approaches to open communications. The third article [3] evaluated several products that exemplify the current state of practice in EMCIS. It is important for energy managers in the Federal sector to have a high level of knowledge and understanding of these complex energy management systems. This series of articles provides energy practitioners with some basic informational and educational tools to help make decisions relative to energy management systems design, specification, procurement, and energy savings potential.

  9. Policy Flash 2005-53

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2013-40 DATE: March 19, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 43.3 - Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement Contracts for Capital Asset Projects, Environmental Remediation, Decontamination and Decommissioning, Facility Operations, and

  10. TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2013-58 DATE: June 5, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Guide for Financial Assistance SUMMARY: Attached is a revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was last issued. The revision date has been inserted in the

  11. U-205: RSA Access Manager Session Replay Flaw Lets Remote Users Access the System

    Broader source: Energy.gov [DOE]

    A vulnerability was reported in RSA Access Manager. A remote user can gain access to the target system.

  12. Office of Personnel Management (OPM) Billing System PIA, Office of Health,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety and Security | Department of Energy Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security PDF icon Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security More Documents & Publications PIA - Security Clearance Work Tracking

  13. Method and system for managing power grid data

    SciTech Connect (OSTI)

    Yin, Jian; Akyol, Bora A.; Gorton, Ian

    2015-11-10

    A system and method of managing time-series data for smart grids is disclosed. Data is collected from a plurality of sensors. An index is modified for a newly created block. A one disk operation per read or write is performed. The one disk operation per read includes accessing and looking up the index to locate the data without movement of an arm of the disk, and obtaining the data. The one disk operation per write includes searching the disk for free space, calculating an offset, modifying the index, and writing the data contiguously into a block of the disk the index points to.

  14. Waste Heat Management Options: Industrial Process Heating Systems

    Broader source: Energy.gov (indexed) [DOE]

    Heat Management Options Industrial Process Heating Systems By Dr. Arvind C. Thekdi E-mail: athekdi@e3minc.com E3M, Inc. August 20, 2009 2 Source of Waste Heat in Industries * Steam Generation * Fluid Heating * Calcining * Drying * Heat Treating * Metal Heating * Metal and Non-metal Melting * Smelting, agglomeration etc. * Curing and Forming * Other Heating Waste heat is everywhere! Arvind Thekdi, E3M Inc Arvind Thekdi, E3M Inc 3 Waste Heat Sources from Process Heating Equipment * Hot gases -

  15. Federal Emergency Management Information System (FEMIS) system administration guide, version 1.4.5

    SciTech Connect (OSTI)

    Arp, J.A.; Burnett, R.A.; Carter, R.J.

    1998-06-26

    The Federal Emergency Management Information Systems (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication, data distribution, and notification functionality necessary to operate FEMIS in a networked, client/server environment. The UNIX server provides an Oracle relational database management system (RDBMS) services, ARC/INFO GIS (optional) capabilities, and basic file management services. PNNL developed utilities that reside on the server include the Notification Service, the Command Service that executes the evacuation model, and AutoRecovery. To operate FEMIS, the Application Software must have access to a site specific FEMIS emergency management database. Data that pertains to an individual EOC`s jurisdiction is stored on the EOC`s local server. Information that needs to be accessible to all EOCs is automatically distributed by the FEMIS database to the other EOCs at the site.

  16. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Frappaolo, C.

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records` life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites.

  17. Applications of Geographic Information Systems technology for environmental planning and management in North Carolina

    SciTech Connect (OSTI)

    Nagy, Z.; Wiele-Evans, C. Van Der )

    1993-01-01

    The State of North Carolina is developing a multipurpose geographic information systems (GIS) database for widespread use. The database currently consists of more than fifty categories of information state wide. In addition to basic planimetric information, the data include many categories of environmental significance. Much of the database has proven useful to planners, managers, and consultants involved with environmental policy-making and protection. The database is being used to augment activities in regulatory programs, research programs and in a variety of siting applications. The North Carolina Center for Geographic Information and Analysis (NCCGIA) has operated the State's GIS since 1977 and is the lead coordinating agency for geographic information in the state. NCCGIA is able to develop and maintain the corporate database through partnerships with other state, federal, regional, and local government agencies and private organizations. Users access the database at NCCGIA for the production of maps and statistics, to spontaneously generate displays of a project area, to acquire data, and to conduct special studies. This paper describes some of the activities associated with environmental planning and management applications at the North Carolina Center for Geographic Information and Analysis. Specifically, it illustrates the following: the conceptual framework for development and maintenance of the corporate database; the contents of the database; several environmental planning documents and applications developed at NCCGIA; and methods of data access.

  18. Improved Decision Making through the Integration of Program and Project Management with National Environmental Policy Act Compliance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-06-12

    Recommendations from the DOE Field Management Council (FMC), NEPA Improvement Team, and the Council on Environmental Quality (CEQ) for improving NEPA compliance through the integration of Program ad Project Management

  19. Transportation functions of the Civilian Radioactive Waste Management System

    SciTech Connect (OSTI)

    Shappert, L.B.; Attaway, C.R.; Pope, R.B.; Best, R.E.; Danese, F.L.; Dixon, L.D.; Jones, R.H.; Klimas, M.J.; Peterson, R.W.

    1992-03-01

    Within the framework of Public Law 97.425 and provisions specified in the Code of Federal Regulations, Title 10 Part 961, the US Department of Energy has the responsibility to accept and transport spent fuel and high-level waste from various organizations which have entered into a contract with the federal government in a manner that protects the health and safety of the public and workers. In implementing these requirements, the Office of Civilian Radioactive Waste Management (OCRWM) has, among other things, supported the identification of functions that must be performed by a transportation system (TS) that will accept the waste for transport to a federal facility for storage and/or disposal. This document, through the application of system engineering principles, identifies the functions that must be performed to transport waste under this law.

  20. DOE technology information management system database study report

    SciTech Connect (OSTI)

    Widing, M.A.; Blodgett, D.W.; Braun, M.D.; Jusko, M.J.; Keisler, J.M.; Love, R.J.; Robinson, G.L.

    1994-11-01

    To support the missions of the US Department of Energy (DOE) Special Technologies Program, Argonne National Laboratory is defining the requirements for an automated software system that will search electronic databases on technology. This report examines the work done and results to date. Argonne studied existing commercial and government sources of technology databases in five general areas: on-line services, patent database sources, government sources, aerospace technology sources, and general technology sources. First, it conducted a preliminary investigation of these sources to obtain information on the content, cost, frequency of updates, and other aspects of their databases. The Laboratory then performed detailed examinations of at least one source in each area. On this basis, Argonne recommended which databases should be incorporated in DOE`s Technology Information Management System.

  1. Framework for SCADA Security Policy

    Office of Environmental Management (EM)

    Framework for SCADA Security Policy Dominique Kilman Jason Stamp dkilman@sandia.gov jestamp@sandia.gov Sandia National Laboratories Albuquerque, NM 87185-0785 Abstract - Modern automation systems used in infrastruc- ture (including Supervisory Control and Data Acquisition, or SCADA) have myriad security vulnerabilities. Many of these relate directly to inadequate security administration, which precludes truly effective and sustainable security. Adequate security management mandates a clear

  2. Enforcement Policy Statement Regarding Walk-in Cooler/Walk-in Freezer Refrigeration Systems

    Office of Environmental Management (EM)

    Issued: August 14, 2015 Updated: August 31, 2015 NOTE: This policy is not currently in effect. As noted below, this policy will become effective only if the requirement in section (2) below is satisfied. The Appliance Standards and Rulemaking Advisory Committee (ASRAC) established a working group to engage in negotiations concerning the rulemaking contemplated in the settlement agreement described below, and the first working group meeting was held on August 27, 2015. Under section (2), this

  3. Integrated Baseline System (IBS). Version 1.03, System Management Guide

    SciTech Connect (OSTI)

    Williams, J.R.; Bailey, S.; Bower, J.C.

    1993-01-01

    This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide also includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.

  4. Policy Flash 2014-34

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to A. Scott Geary, of the  Office of Acquisition and Project Management Policy at 202-287-1507 or at andrew.geary@hq.doe.gov.

  5. E-Commerce Policies- Purpose

    Broader source: Energy.gov [DOE]

    To establish policies for the use of the Strategic Integrated Procurement Enterprise System (referred to as "STRIPES"). These policies supplement the DOE policies for the use of the Government...

  6. Energy Management System Lowers U.S. Navy Energy Costs Through PV System Interconnection (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-04-01

    To meet the U.S. Navy's energy goals, the National Renewable Energy Laboratory (NREL) and the Naval Facilities Engineering Command (NAVFAC) spent two years collaborating on demonstrations that tested market-ready energy efficiency measures, renewable energy generation, and energy systems integration. One such technology - an energy management system - was identified as a promising method for reducing energy use and costs, and can contribute to increasing energy security.

  7. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 34 - Major Systems Acquisition Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts Chapter 16 - Types of Contracts

  8. River Protection Project Integrated safety management system phase II verification report, volumes I and II - 8/19/99

    SciTech Connect (OSTI)

    SHOOP, D.S.

    1999-09-10

    The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES&H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractor proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.

  9. Solid waste information and tracking system server conversion project management plan

    SciTech Connect (OSTI)

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  10. NGNP Data Management and Analysis System Modeling Capabilities

    SciTech Connect (OSTI)

    Cynthia D. Gentillon

    2009-09-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. In addition, thermal-hydraulic experiments are conducted to validate codes used to assess reactor safety. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the third NDMAS objective. It describes capabilities for displaying the data in meaningful ways and identifying relationships among the measured quantities that contribute to their understanding.

  11. INTEGRATED SAFETY MANAGEMENT SYSTEM SAFETY CULTURE IMPROVEMENT INITIATIVE

    SciTech Connect (OSTI)

    MCDONALD JA JR

    2009-01-16

    In 2007, the Department of Energy (DOE) identified safety culture as one of their top Integrated Safety Management System (ISMS) related priorities. A team was formed to address this issue. The team identified a consensus set of safety culture principles, along with implementation practices that could be used by DOE, NNSA, and their contractors. Documented improvement tools were identified and communicated to contractors participating in a year long pilot project. After a year, lessons learned will be collected and a path forward determined. The goal of this effort was to achieve improved safety and mission performance through ISMS continuous improvement. The focus of ISMS improvement was safety culture improvement building on operating experience from similar industries such as the domestic and international commercial nuclear and chemical industry.

  12. Thermal management of long-length HTS cable systems

    SciTech Connect (OSTI)

    Demko, Jonathan A; Hassenzahl, William V

    2011-01-01

    Projections of electric power production suggest a major shift to renewables, such as wind and solar, which will be in remote locations where massive quantities of power are available. One solution for transmitting this power over long distances to load centers is direct current (dc), high temperature superconducting (HTS) cables. Electric transmission via dc cables promises to be effective because of the low-loss, highcurrent- carrying capability of HTS wire at cryogenic temperatures. However, the thermal management system for the cable must be carefully designed to achieve reliable and energyefficient operation. Here we extend the analysis of a superconducting dc cable concept proposed by the Electric Power Research Institute (EPRI), which has one stream of liquid nitrogen flowing in a cryogenic enclosure that includes the power cable, and a separate return tube for the nitrogen. Refrigeration stations positioned every 10 to 20 km cool both nitrogen streams. Both go and return lines are contained in a single vacuum/cryogenic envelope. Other coolants, including gaseous helium and gaseous hydrogen, could provide potential advantages, though they bring some technical challenges to the operation of long-length HTS dc cable systems. A discussion of the heat produced in superconducting cables and a system to remove the heat are discussed. Also, an analysis of the use of various cryogenic fluids in long-distance HTS power cables is presented.

  13. Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.4.6

    SciTech Connect (OSTI)

    Arp, J.A.; Bower, J.C.; Burnett, R.A.; Carter, R.J.; Downing, T.R.; Fangman, P.M.; Gerhardstein, L.H.; Homer, B.J.; Johnson, D.M.; Johnson, R.L.; Johnson, S.M.; Loveall, R.M.; Martin, T.J.; Millard, W.D.; Schulze, S.A.; Stoops, L.R.; Tzemos, S.; Wood, B.M.

    1999-06-29

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are corrected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication data distribution and notification functionality necessary to operate FEMIS in a networked, client/server environment.

  14. Policy Flash 2012-53

    Broader source: Energy.gov (indexed) [DOE]

    Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Accelerating Payment to Small Business Subcontractors SUMMARY: OMB...

  15. Policy Flash 2012-64

    Broader source: Energy.gov (indexed) [DOE]

    Office of Policy Office of Acquisition and Project Management SUBJECT: Contract Clause Matrix SUMMARY: Attached for your information is a corrected Department of Energy Acquisition...

  16. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    14, 2011 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Acquisition Guide...

  17. Functional requirements for the Automated Transportation Management System: TTP number: RL 439002

    SciTech Connect (OSTI)

    Portsmouth, J.H.

    1992-12-31

    This requirements analysis, documents Department of Energy (DOE) transportation management procedures for the purpose of providing a clear and mutual understanding between users and designers of the proposed Automated Transportation Management System (ATMS). It is imperative that one understand precisely how DOE currently performs traffic management tasks; only then can an integrated system be proposed that successfully satisfies the major requirements of transportation managers and other system users. Accordingly, this report describes the current workings of DOE transportation organizations and then proposes a new system which represents a synthesis of procedures (both current and desired) which forms the basis for further systems development activities.

  18. Position Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-06-23

    The order prescribes the policies, responsibilities, and procedures for position management within (DOE). Canceled by DOE N 1321.140. Cancels DOE 3510.1

  19. Quality Management

    Broader source: Energy.gov [DOE]

    The Office of Quality Management, within the Office of Health, Safety and Security develops policies and procedures to ensure the classification and control of information is effective and...

  20. Selenium Speciation and Management in Wet FGD Systems

    SciTech Connect (OSTI)

    Searcy, K; Richardson, M; Blythe, G; Wallschlaeger, D; Chu, P; Dene, C

    2012-02-29

    This report discusses results from bench- and pilot-scale simulation tests conducted to determine the factors that impact selenium speciation and phase partitioning in wet FGD systems. The selenium chemistry in wet FGD systems is highly complex and not completely understood, thus extrapolation and scale-up of these results may be uncertain. Control of operating parameters and application of scrubber additives have successfully demonstrated the avoidance or decrease of selenite oxidation at the bench and pilot scale. Ongoing efforts to improve sample handling methods for selenium speciation measurements are also discussed. Bench-scale scrubber tests explored the impacts of oxidation air rate, trace metals, scrubber additives, and natural limestone on selenium speciation in synthetic and field-generated full-scale FGD liquors. The presence and concentration of redox-active chemical species as well as the oxidation air rate contribute to the oxidation-reduction potential (ORP) conditions in FGD scrubbers. Selenite oxidation to the undesirable selenate form increases with increasing ORP conditions, and decreases with decreasing ORP conditions. Solid-phase manganese [Mn(IV)] appeared to be the significant metal impacting the oxidation of selenite to selenate. Scrubber additives were tested for their ability to inhibit selenite oxidation. Although dibasic acid and other scrubber additives showed promise in early clear liquor (sodium based and without calcium solids) bench-scale tests, these additives did not show strong inhibition of selenite oxidation in tests with higher manganese concentrations and with slurries from full-scale wet FGD systems. In bench-tests with field liquors, addition of ferric chloride at a 250:1 iron-to-selenium mass ratio sorbed all incoming selenite to the solid phase, although addition of ferric salts had no impact on native selenate that already existed in the field slurry liquor sample. As ORP increases, selenite may oxidize to selenate more rapidly than it sorbs to ferric solids. Though it was not possible to demonstrate a decrease in selenium concentrations to levels below the project�¢����s target of 50 ���µg/L during pilot testing, some trends observed in bench-scale testing were evident at the pilot scale. Specifically, reducing oxidation air rate and ORP tends to either retain selenium as selenite in the liquor or shift selenium phase partitioning to the solid phase. Oxidation air flow rate control may be one option for managing selenium behavior in FGD scrubbers. Units that cycle load widely may find it more difficult to impact ORP conditions with oxidation air flow rate control alone. Because decreasing oxidation air rates to the reaction tank showed that all �¢����new�¢��� selenium reported to the solids, the addition of ferric chloride to the pilot scrubber could not show further improvements in selenium behavior. Ferric chloride addition did shift mercury to the slurry solids, specifically to the fine particles. Several competing pathways may govern the reporting of selenium to the slurry solids: co-precipitation with gypsum into the bulk solids and sorption or co-precipitation with iron into the fine particles. Simultaneous measurement of selenium and mercury behavior suggests a holistic management strategy is best to optimize the fate of both of these elements in FGD waters. Work conducted under this project evaluated sample handling and analytical methods for selenium speciation in FGD waters. Three analytical techniques and several preservation methods were employed. Measurements of selenium speciation over time indicated that for accurate selenium speciation, it is best to conduct measurements on unpreserved, filtered samples as soon after sampling as possible. The capital and operating costs for two selenium management strategies were considered: ferric chloride addition and oxidation air flow rate control. For ferric chloride addition, as migh

  1. Review of LCA studies of solid waste management systems – Part II: Methodological guidance for a better practice

    SciTech Connect (OSTI)

    Laurent, Alexis; Clavreul, Julie; Bernstad, Anna; Bakas, Ioannis; Niero, Monia; Gentil, Emmanuel; Christensen, Thomas H.; Hauschild, Michael Z.

    2014-03-01

    Highlights: • We perform a critical review of 222 LCA studies of solid waste management systems. • We analyse the past LCA practice against the ISO standard and ILCD Handbook guidance. • Malpractices exist in many methodological aspects with large variations among studies. • Many of these aspects are important for the reliability of the results. • We provide detailed recommendations to practitioners of waste management LCAs. - Abstract: Life cycle assessment (LCA) is increasingly used in waste management to identify strategies that prevent or minimise negative impacts on ecosystems, human health or natural resources. However, the quality of the provided support to decision- and policy-makers is strongly dependent on a proper conduct of the LCA. How has LCA been applied until now? Are there any inconsistencies in the past practice? To answer these questions, we draw on a critical review of 222 published LCA studies of solid waste management systems. We analyse the past practice against the ISO standard requirements and the ILCD Handbook guidelines for each major step within the goal definition, scope definition, inventory analysis, impact assessment, and interpretation phases of the methodology. Results show that malpractices exist in several aspects of the LCA with large differences across studies. Examples are a frequent neglect of the goal definition, a frequent lack of transparency and precision in the definition of the scope of the study, e.g. an unclear delimitation of the system boundaries, a truncated impact coverage, difficulties in capturing influential local specificities such as representative waste compositions into the inventory, and a frequent lack of essential sensitivity and uncertainty analyses. Many of these aspects are important for the reliability of the results. For each of them, we therefore provide detailed recommendations to practitioners of waste management LCAs.

  2. The Do and Check Processes of an Energy Management System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy The Do and Check Processes of an Energy Management System The Do and Check Processes of an Energy Management System This presentation covers the Do and Check processes of an Energy Management System. "Do" processes include training, documents, operational control, communication, design, and procurement. "Check" processes include measuring and monitoring, legal requirements, internal auditing, non-conformance (corrective and preventive), and records. PDF icon The Do

  3. Energy.gov Data Tables in Content Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Tables in Content Management System Energy.gov Data Tables in Content Management System For Office of Energy Efficiency and Renewable Energy (EERE) websites, follow these guidelines for creating Section 508-compliant data tables in the Energy.gov content management system. Designate Row and Column Headers You must designate row and/or column headings for your table to be accessible. To do this: Place your cursor in the heading cell. Right click and select Cell > Cell Properties. Under

  4. DOE Order Self Study Modules - DOE O 151.1C Comprehensive Emergency Management System

    Office of Environmental Management (EM)

    O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM NATIONAL NUCLEAR SECURITY ADMINISTRATION SERVICE CENTER Change No: 3 DOE O 151.1C Level: Familiar Date: 12/1/08 1 DOE O 151.1C COMPREHENSIVE EMERGENCY MANAGEMENT SYSTEM FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources listed below, you will be able to: 1. List the objectives of DOE O 151.1C, Comprehensive Emergency Management System

  5. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 DATE: August 6, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter 11- Non-Management and Operating (Non- M&O) Contractor Business Systems Clauses for Section H SUMMARY: This Acquisition Letter (AL) implements compliance enforcement mechanisms in the form of business systems clause and related clauses that requires the contractor to have acceptable business

  6. Bioenergy market competition for biomass: A system dynamics review of current policies

    SciTech Connect (OSTI)

    Jacob J. Jacobson; Robert Jeffers

    2013-07-01

    There is growing interest in the United States and abroad to increase the use of biomass as an energy source due to environmental and energy security benefits. In the United States, the biofuel and biopower industries are regulated by different policies and different agencies and have different drivers, which impact the maximum price the industries are willing to pay for biomass. This article describes a dynamic computer simulation model that analyzes future behavior of bioenergy feedstock markets based on varying policy and technical options. The model simulates the long-term dynamics of these markets by treating advanced biomass feedstocks as a commodity and projecting the total demand of each industry, as well as the market price over time. The model is used for an analysis of the United States bioenergy feedstock market that projects supply, demand, and market price given three independent buyers: domestic biopower, domestic biofuels, and foreign exports. With base-case assumptions, the biofuels industry is able to dominate the market and meet the federal Renewable Fuel Standard (RFS) targets for advanced biofuels. Further analyses suggest that United States bioenergy studies should include estimates of export demand for biomass in their projections, and that GHG-limiting policy would partially shield both industries from export dominance.

  7. Adding Links in Energy.gov Content Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy.gov Content Management System » Adding Links in Energy.gov Content Management System Adding Links in Energy.gov Content Management System For Office of Energy Efficiency and Renewable Energy (EERE) websites, to add a link in the Energy.gov Drupal content management system (CMS), follow these steps: Edit the page (also called a node) that you want to add a link to. Select the text you want to link. Click the "Link" button. Then: If you are linking to a page on Energy.gov, select

  8. Emergency Diesel Generation System Surveillance Test Policy Optimization Through Genetic Algorithms Using Non-Periodic Intervention Frequencies and Seasonal Constraints

    SciTech Connect (OSTI)

    Lapa, Celso M.F.; Pereira, Claudio M.N.A. [CNEN, Comissao Nacional de Energia Nuclear, Rua General Severiano 90, Rio de Janeiro, RJ-22-294-900 (Brazil); Frutuoso e Melo, P.F. [COPPE/UFRJ, Cidade Universitaria, Centro de Tecnologia, Bloco G, sala 101, Ilha do Fundao, 21945-970, Rio de Janeiro - RJ (Brazil)

    2002-07-01

    Nuclear standby safety systems must frequently, be submitted to periodic surveillance tests. The main reason is to detect, as soon as possible, the occurrence of unrevealed failure states. Such interventions may, however, affect the overall system availability due to component outages. Besides, as the components are demanded, deterioration by aging may occur, penalizing again the system performance. By these reasons, planning a good surveillance test policy implies in a trade-off between gains and overheads due to the surveillance test interventions. In order maximize the systems average availability during a given period of time, it has recently been developed a non-periodic surveillance test optimization methodology based on genetic algorithms (GA). The fact of allowing non-periodic tests turns the solution space much more flexible and schedules can be better adjusted, providing gains in the overall system average availability, when compared to those obtained by an optimized periodic tests scheme. The optimization problem becomes, however, more complex. Hence, the use of a powerful optimization technique, such as GAs, is required. Some particular features of certain systems can turn it advisable to introduce other specific constraints in the optimization problem. The Emergency Diesel Generation System (EDGS) of a Nuclear Power Plant (N-PP) is a good example for demonstrating the introduction of seasonal constraints in the optimization problem. This system is responsible for power supply during an external blackout. Therefore, it is desirable during periods of high blackout probability to maintain the system availability as high as possible. Previous applications have demonstrated the robustness and effectiveness of the methodology. However, no seasonal constraints have ever been imposed. This work aims at investigating the application of such methodology in the Angra-II Brazilian NPP EDGS surveillance test policy optimization, considering the blackout probability growth during summer, due to the electrical power demand increase. Here, the model used penalizes test interventions by a continuous modulating function, which depends on the instantaneous blackout probability. Results have demonstrated the ability of the method in adapting the surveillance tests policy to seasonal behaviors. The knowledge acquired by the GA during the searching process has lead to test schedules that drastically minimize the test interventions at periods of high blackout probability. It is compensated by more frequent tests redistributed through the periods of low blackout probability, in order to provide improvement on the overall average availability at the system level. (authors)

  9. Data Management Guide: Integrated Baseline System (IBS). Version 2.1

    SciTech Connect (OSTI)

    Bower, J.C. [Bower Software Services, Kennewick, Washington (United States)] Bower Software Services, Kennewick, Washington (United States); Burford, M.J.; Downing, T.R.; Moise, M.C.; Williams, J.R. [Pacific Northwest Lab., Richland, WA (United States)] Pacific Northwest Lab., Richland, WA (United States)

    1995-01-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Nuclear and Chemical Agency (USANCA). The IBS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain a site-specific map database. Data and system managers use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of the IBS. This document provides a description of the data files and structures necessary for running the IBS software and using the site map database.

  10. WIPP Documents - National Environmental Policy Act (NEPA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Environmental Policy Act (NEPA) Adoption of Environmental Assessment DOI-BLM-NM-P020-11-1414 Double Eagle Water System DOE/EA-1905 October 2011 This document examines the potential environmental impacts associated with providing DOE funding for the proposed improvements to the City of Carlsbad Double Eagle Water System Amendment to the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of Transuranic Waste This Federal Register Notice

  11. Distributed Resource Energy Analysis and Management System (DREAMS) Development for Real-time Grid Operations

    Broader source: Energy.gov [DOE]

    Hawaii has two different Energy Management Systems (EMS) on the islands of Oahu and Maui, and already has very high solar penetration. This project will design new capabilities for these systems to...

  12. User Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy Print 1. Guiding Principles The aim of User Policy at the Advanced Light Source (ALS) is to provide a framework for establishing a challenging yet congenial environment...

  13. Security Policy

    Broader source: Energy.gov [DOE]

    The Office of Security Policy analyzes, develops and interprets safeguards and security policy governing national security functions and the protection of related critical assets entrusted to the...

  14. Web Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Web Policies Web Policies Accessibility The National Energy Research Scientific Computing Center (NERSC) is part of the Lawrence Berkeley National Laboratory (Berkeley Lab), which ...

  15. Web Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies aboutassetsimagesicon-70th.jpg Web Policies LANL places a high degree of ... Contact Us Web Team Email More Like This Bradbury Science Museum Calendar Corporate ...

  16. Earned Value Management System (EVMS) Certifications | U.S. DOE Office of

    Office of Science (SC) Website

    Science (SC) Earned Value Management System (EVMS) Certifications Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW

  17. Policy Flash 2013-03

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2013-03 DATE: October 11, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Responding to solicitations under DOE's Work for Others Program (WFO) SUMMARY: Under the WFO program, DOE provides access to and use of its contractor and facility resources to non-DOE sources. DOE has developed policies and procedures to ensure compliance with applicable laws, regulations and

  18. Register today! Professional Training for Certified Practitioners in Energy Management Systems

    Broader source: Energy.gov [DOE]

    Energy professionals are invited to the Certified Practitioner in Energy Management Systems training on February 24–27, 2015 in Chicago, IL. The training provides energy professionals with the ability to lead an industrial organization through the development and maintenance of an energy management system, helping to implement ISO 50001 requirements and prepare for Superior Energy Performance (SEP) certification.

  19. A DISTRIBUTED INTELLIGENT AUTOMATED DEMAND RESPONSE BUILDING MANAGEMENT SYSTEM

    SciTech Connect (OSTI)

    Auslander, David; Culler, David; Wright, Paul; Lu, Yan; Piette, Mary

    2013-12-30

    The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-­Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-­to-­building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov-­ March) and a steam absorption chiller for use in the warm months (April-­October). Lighting in the open office areas is provided by direct-­indirect luminaries with Building Management System-­based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load during the study period was 1175 kW. Several new tools facilitated this work, such as the Smart Energy Box, the distributed load controller or Energy Information Gateway, the web-­based DR controller (dubbed the Central Load-­Shed Coordinator or CLSC), and the Demand Response Capacity Assessment & Operation Assistance Tool (DRCAOT). In addition, an innovative data aggregator called sMAP (simple Measurement and Actuation Profile) allowed data from different sources collected in a compact form and facilitated detailed analysis of the building systems operation. A smart phone application (RAP or Rapid Audit Protocol) facilitated an inventory of the building’s plug loads. Carbon dioxide sensors located in conference rooms and classrooms allowed demand controlled ventilation. The extensive submetering and nimble access to this data provided great insight into the details of the building operation as well as quick diagnostics and analyses of tests. For example, students discovered a short-­cycling chiller, a stuck damper, and a leaking cooling coil in the first field tests. For our final field tests, we were able to see how each zone was affected by the DR strategies (e.g., the offices on the 7th floor grew very warm quickly) and fine-­tune the strategies accordingly.

  20. DOE ZERH Webinar: Quality Management Systems for ZERH

    Broader source: Energy.gov [DOE]

    Description:The session will provide background and guidance for how Zero Energy Ready Home builders can integrate a quality management program in their business. The focus will be on facilitating...

  1. Lessons Learned from Cyber Security Assessments of SCADA and Energy Management Systems

    Office of Environmental Management (EM)

    U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Enhancing control systems security in the energy sector NSTB September 2006 LESSONS LEARNED FROM CYBER SECURITY ASSESSMENTS OF SCADA AND ENERGY MANAGEMENT SYSTEMS Raymond K. Fink David F. Spencer Rita A. Wells NSTB INL/CON-06-11665 iii ABSTRACT Results from ten cyber security vulnerability assessments of process control, SCADA, and energy management systems, or components of those systems, were reviewed to identify

  2. Policy Flash 2013-33 Department of Energy Order 206.2 Identity...

    Broader source: Energy.gov (indexed) [DOE]

    Managment (ICAM) Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of...

  3. Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at ...

  4. Policy Flash 2014-19 Electronic Products Environmental Assessment Tool (EPEAT)

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Sharon Archer of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management...

  5. National Environmental Policy Act (NEPA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management System » National Environmental Policy Act (NEPA) National Environmental Policy Act (NEPA) Regulations and Links DOE NEPA Website NEPA Compliance Program (DOE O 451.1B) Council on Environmental Quality Citizen's Guide to the NEPA Recent NEPA Actions and Determinations Categorically Excluded Actions Environmental Assessments (EA) None in Progress Environmental Impact Statements (EIS) Uranium Leasing Program Programmatic EIS Record of Decision (ROD) issued in May 2014

  6. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 DATE: November 26 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Update to Congressional Notifications - Full Implementation of Advanced Notification of Awards (ANA) System SUMMARY: Policy Flash 2013-36 transmitted Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6 describing the revised ANA process. There are no changes to these two

  7. Los Alamos hybrid environment: an integrated development/configuration management system

    SciTech Connect (OSTI)

    Cort, G.

    1984-01-01

    I present the details of a hybrid configuration management system that utilizes a commercial configuration management tool (Softool's Change and Configuration Control environment) to monitor and control the development of mission-critical software systems at the Los Alamos Weapons Neutron Research Facility. The hybrid system combines features of the VMS host operating system and elements of the tool environment to integrate a flexible development environment with a very powerful automated configuration management system. The features of this system are presented with particular emphasis on the benefits of the hybrid approach. The complementary nature of the constituent environments is described. Special attention is given the issues of operational tradeoffs, personnel interaction and utilization, management visibility and overall system performance. It is shown that by employing a special interface data structure, the hybrid environment supports a much higher level of automation (of both development and configuration management activities) than is realizable in either environment individually. Examples are provided to illustrate the extent to which development activities and all phases of configuration management can be automated under this system. It is shown that in the process of providing a rigorous configuration management environment, the system remains virtually transparent to software development personnel and actually enhances the programmer's capabilities.

  8. Impacts of Long-term Drought on Power Systems in the U.S. Southwest...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (above water level) * Higher water temperature at intake may lead to violation of ... traditionally managed through heuristic regulation policies based on historical system ...

  9. Main Principles of the Perspective System of SNF Management in Russia - 13333

    SciTech Connect (OSTI)

    Baryshnikov, Mikhail

    2013-07-01

    For the last several years the System of the Spent Nuclear Fuel management in Russia was seriously changed. The paper describes the main principles of the changes and the bases of the Perspective System of SNF Management in Russia. Among such the bases there are the theses with the interesting names like 'total knowledge', 'pollutant pays' and 'pay and forget'. There is also a brief description of the modern Russian SNF Management Infrastructure. And an outline of the whole System. The System which is - in case of Russia - is quite necessary to adjust SNF accumulation and to utilize the nuclear heritage. (authors)

  10. Policy Flash 2015-04 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class Deviation for Use of Clause 52.222-99, Establishing a Minimum Wage for Contractors...

  11. Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005...

    Broader source: Energy.gov (indexed) [DOE]

    Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at...

  12. Policy Flash 2012-25 | Department of Energy

    Office of Environmental Management (EM)

    5 Policy Flash 2012-25 Attached is Policy Flash 2012-25 - Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative and...

  13. Policy Flash 2015-11 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Steps Outlined in OFPP ...

  14. Electronic Document Management System PIA, BechtelJacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Dosimetry Records System PIA, bechtel Jacobs Company, LLC Pension Estimate System PIA, Bechtel Jacobs Company, LLC Medgate, PIA, Bechtel Jacobs ...

  15. Enterprise Assessments Targeted Review of the Safety System Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Confinement System and Power Distribution Safety System at the Y-12 National Security Complex Highly Enriched Uranium Materials Facility - December 2015 Enterprise Assessments...

  16. System-wide power management control via clock distribution network

    DOE Patents [OSTI]

    Coteus, Paul W.; Gara, Alan; Gooding, Thomas M.; Haring, Rudolf A.; Kopcsay, Gerard V.; Liebsch, Thomas A.; Reed, Don D.

    2015-05-19

    An apparatus, method and computer program product for automatically controlling power dissipation of a parallel computing system that includes a plurality of processors. A computing device issues a command to the parallel computing system. A clock pulse-width modulator encodes the command in a system clock signal to be distributed to the plurality of processors. The plurality of processors in the parallel computing system receive the system clock signal including the encoded command, and adjusts power dissipation according to the encoded command.

  17. Mike Carr Senior Advisor to the Director, Energy Policy and Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... expenses and informing the investor community on the status and progress of MHK systems. ... These demonstrations have greatly increased our knowledge and understanding of device ...

  18. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:www.nnsa.energy.govaboutusouroperationsmanagementandbudget

  19. DualTrust: A Trust Management Model for Swarm-Based Autonomic Computing Systems

    SciTech Connect (OSTI)

    Maiden, Wendy M.

    2010-05-01

    Trust management techniques must be adapted to the unique needs of the application architectures and problem domains to which they are applied. For autonomic computing systems that utilize mobile agents and ant colony algorithms for their sensor layer, certain characteristics of the mobile agent ant swarm -- their lightweight, ephemeral nature and indirect communication -- make this adaptation especially challenging. This thesis looks at the trust issues and opportunities in swarm-based autonomic computing systems and finds that by monitoring the trustworthiness of the autonomic managers rather than the swarming sensors, the trust management problem becomes much more scalable and still serves to protect the swarm. After analyzing the applicability of trust management research as it has been applied to architectures with similar characteristics, this thesis specifies the required characteristics for trust management mechanisms used to monitor the trustworthiness of entities in a swarm-based autonomic computing system and describes a trust model that meets these requirements.

  20. Market and policy barriers to energy storage deployment : a study for the energy storage systems program.

    SciTech Connect (OSTI)

    Bhatnagar, Dhruv; Currier, Aileen B.; Hernandez, Jacquelynne; Ma, Ookie; Kirby, Brendan

    2013-09-01

    Electric energy storage technologies have recently been in the spotlight, discussed as essential grid assets that can provide services to increase the reliability and resiliency of the grid, including furthering the integration of variable renewable energy resources. Though they can provide numerous grid services, there are a number of factors that restrict their current deployment. The most significant barrier to deployment is high capital costs, though several recent deployments indicate that capital costs are decreasing and energy storage may be the preferred economic alternative in certain situations. However, a number of other market and regulatory barriers persist, limiting further deployment. These barriers can be categorized into regulatory barriers, market (economic) barriers, utility and developer business model barriers, crosscutting barriers and technology barriers. This report, through interviews with stakeholders and review of regulatory filings in four regions roughly representative of the United States, identifies the key barriers restricting further energy storage development in the country. The report also includes a discussion of possible solutions to address these barriers and a review of initiatives around the country at the federal, regional and state levels that are addressing some of these issues. Energy storage could have a key role to play in the future grid, but market and regulatory issues have to be addressed to allow storage resources open market access and compensation for the services they are capable of providing. Progress has been made in this effort, but much remains to be done and will require continued engagement from regulators, policy makers, market operators, utilities, developers and manufacturers.

  1. Systems and methods for managing shared-path instrumentation and irradiation targets in a nuclear reactor

    DOE Patents [OSTI]

    Heinold, Mark R.; Berger, John F.; Loper, Milton H.; Runkle, Gary A.

    2015-12-29

    Systems and methods permit discriminate access to nuclear reactors. Systems provide penetration pathways to irradiation target loading and offloading systems, instrumentation systems, and other external systems at desired times, while limiting such access during undesired times. Systems use selection mechanisms that can be strategically positioned for space sharing to connect only desired systems to a reactor. Selection mechanisms include distinct paths, forks, diverters, turntables, and other types of selectors. Management methods with such systems permits use of the nuclear reactor and penetration pathways between different systems and functions, simultaneously and at only distinct desired times. Existing TIP drives and other known instrumentation and plant systems are useable with access management systems and methods, which can be used in any nuclear plant with access restrictions.

  2. CRAD, Management- Office of River Protection K Basin Sludge Waste System

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2004 assessment of the Management at the Office of River Protection K Basin Sludge Waste System.

  3. Independent Oversight Review of Integrated Safety Management System Effectiveness at the Livermore Site Office, October 2011

    Office of Environmental Management (EM)

    Health, Safety and Security Office of Enforcement and Oversight Independent Oversight Review of Integrated Safety Management System Effectiveness at the Livermore Site Office October 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ............................................................................................................................................. 1 2.0 Background

  4. Work Authorization System | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Work Authorization System More Documents & Publications Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System Administrative Change EERE Program Management Guide - Chapter 6 Cost-Shared Development of Innovative Small Modular Reactor Designs

  5. Enforcement Policy Statement Regarding Walk-in Cooler/Walk-in Freezer Refrigeration Systems

    Office of Environmental Management (EM)

    Issued: August 14, 2015 Updated: February 1, 2016 In an exercise of its enforcement discretion, DOE will not seek civil penalties or injunctive relief concerning violations of the four energy conservation standards applicable to dedicated condensing refrigeration systems operating at medium temperatures that are promulgated at 10 C.F.R. § 431.306(e), provided that the violations are related to the distribution in commerce of WICF refrigeration system components manufactured prior to January 1,

  6. Enforcement Policy Statement: Split-System Central Air Conditioners Without HSVC

    Office of Environmental Management (EM)

    Split-System Central Air Conditioners Without HSVC December 16, 2015 In the November 9, 2015 central air conditioner test procedure supplemental notice of proposed rulemaking (80 FR 69278), DOE explained that it had been using its enforcement discretion not to seek civil penalties for split-system central air conditioners that were in distribution in commerce but had not been tested in accordance with the DOE test procedure. Although the issue can arise in other contexts, the majority of these

  7. T-606: Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data

    Broader source: Energy.gov [DOE]

    Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data.

  8. 31 TAC 15.3 - Management of the Beach/Dune System Administration...

    Open Energy Info (EERE)

    TAC 15.3 - Management of the BeachDune System Administration Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 31 TAC 15.3 -...

  9. Building America Expert Meeting: Minutes from Automated Home Energy Management System

    Broader source: Energy.gov [DOE]

    These meeting minutes are from the U.S. Department of Energy Building America program expert meeting titled "Automated Home Energy Management System," held on October 1-2, 2010 in Denver, Colorado.

  10. AAC R-18-8-260 Hazardous Waste Management System | Open Energy...

    Open Energy Info (EERE)

    AAC R-18-8-260 Hazardous Waste Management System Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: AAC R-18-8-260 Hazardous...

  11. NAC 444.731 - Class III Solid Waste Management Systems | Open...

    Open Energy Info (EERE)

    .731 - Class III Solid Waste Management Systems Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NAC 444.731 - Class III...

  12. Best Management Practice #3: Distribution System Audits, Leak...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Leaks in distribution systems are caused by a number of factors, including pipe corrosion, ... Different pipe materials transmit different frequencies at differing lengths, creating ...

  13. Earned Value Management System (EVMS) Corrective Action Standard...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EVMS and Project Analysis Standard Operating Procedure (EPASOP) Enhancing Earned Value (EV) Analysis Using Project Assessment & Reporting System (PARS II) - Road Show Presentation...

  14. Quality Management System Guidelines - Building America Top Innovation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Performance Homes, stresses the value of partnering as a powerful tool to integrate thinking, design, and feedback on systems and solutions. BSC's guideline, Advanced...

  15. High Level Waste Management Division High. Level Waste System...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... ProdMod tracks three key waste constituents: 1) sodium, ... HLW System will operate as fast as available funding and ... Restoration and Reactors are also treated.After ...

  16. Energy Management and Information Systems Study - 2014 BTO Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Study - 2014 BTO Peer Review Presenter: Jessica Granderson, Lawrence Berkeley National Laboratory This work aims to give Better Building Alliance members the...

  17. System and method of vehicle operating condition management

    DOE Patents [OSTI]

    Sujan, Vivek A.; Vajapeyazula, Phani; Follen, Kenneth; Wu, An; Moffett, Barty L.

    2015-10-20

    A vehicle operating condition profile can be determined over a given route while also considering imposed constraints such as deviation from time targets, deviation from maximum governed speed limits, etc. Given current vehicle speed, engine state and transmission state, the present disclosure optimally manages the engine map and transmission to provide a recommended vehicle operating condition that optimizes fuel consumption in transitioning from one vehicle state to a target state. Exemplary embodiments provide for offline and online optimizations relative to fuel consumption. The benefit is increased freight efficiency in transporting cargo from source to destination by minimizing fuel consumption and maintaining drivability.

  18. Memorandum, Managed Phase Out of Halon Fixed Fire Suppression Systems- May 5, 1993

    Broader source: Energy.gov [DOE]

    The purpose of this memorandum is to provide additional interim departmental criteria on the management of the reduction and potential elimination of Halon fire extinguishing systems within the Department of Energy (DOE). This memorandum supplements the joint Office of Safety and Quality Assurance/Office of Projects and Facilities Management memorandum of September 27, 1990, in which guidance was provided on the installation of new Halon 1301 fixed fire suppression systems and halon 1211 portable fire extinguishers.

  19. New Demands on Heavy Duty Engine Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demands on Heavy Duty Engine Management Systems New Demands on Heavy Duty Engine Management Systems The purpose of this research was to investigate the potential of emissions-based process control to meet future heavy-duty emissions legislation by identifying suitable actuated variables and developing hardware and related controllers. PDF icon deer08_traver.pdf More Documents & Publications Simulation and Analysis of HP/LP EGR for Heavy-Duty Applications Light-Duty Diesel EngineTechnology to

  20. Energy.gov Content Management System Page Types | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page Types Energy.gov Content Management System Page Types For Office of Energy Efficiency and Renewable Energy (EERE) websites, learn about the standard page types available in the Energy.gov Drupal content management system (CMS). For information about other available page types, or to request a new kind of page type, contact the Site Coordinators. Article Article pages are used for timely information, such as news stories and blog posts. Articles typically display the date the article was

  1. Wireless Battery Management System for Safe High-Capacity Energy Storage

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Wireless Battery Management System for Safe High-Capacity Energy Storage Citation Details In-Document Search Title: Wireless Battery Management System for Safe High-Capacity Energy Storage Authors: Farmer, J ; Chang, J ; Zumstein, J ; Kotovsky, J ; Dobley, A ; Puglia, F ; Osswald, S ; Wolf, K ; Kaschmitter, J ; Eaves, S ; Bandhauer, T Publication Date: 2013-10-01 OSTI Identifier: 1124816 Report Number(s): LLNL-CONF-644556 DOE Contract Number: W-7405-ENG-48

  2. Wireless Battery Management System for Safe High-Capacity Energy Storage

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Wireless Battery Management System for Safe High-Capacity Energy Storage Citation Details In-Document Search Title: Wireless Battery Management System for Safe High-Capacity Energy Storage Ă— You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy

  3. User Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy User Policy Print 1. Guiding Principles The aim of User Policy at the Advanced Light Source (ALS) is to provide a framework for establishing a challenging yet congenial environment where talented scientists from different backgrounds can work together in pursuit of the new scientific opportunities presented by the availability of this innovative facility. User policy must address a variety of user needs and sensitivities. On one hand, the qualified researcher with little financial backing

  4. POLICY FLASH 2013-67 FAC-68 | Department of Energy

    Energy Savers [EERE]

    3-67 FAC-68 POLICY FLASH 2013-67 FAC-68 Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at...

  5. POLICY FLASH 2014-14 | Department of Energy

    Energy Savers [EERE]

    4-14 POLICY FLASH 2014-14 Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340...

  6. management

    National Nuclear Security Administration (NNSA)

    5%2A en Management and Budget http:nnsa.energy.govaboutusouroperationsmanagementandbudget

    P...

  7. NNSA's G2 Management Information System Wins Association for...

    National Nuclear Security Administration (NNSA)

    The 900-plus current users of the system track 19,000 actions per month in scope, schedule, and financial data including geo-spatial information (maps, diagrams, photos, inventory ...

  8. Policy Flash 2013-05 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Policy Flash 2013-05 Attached is Policy Flash 2013-05 Class Deviation from the Federal Acquisition Regulation (FAR) to Implement Office of Management and Budget (OMB) Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors. Questions concerning this policy flash should be directed to Nancy Harvey of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at Nancy.Harvey@hq.doe.gov. PDF icon Class

  9. OPAM Policy Acquisition Guides

    Energy Savers [EERE]

    --Chapter 23.0 (June 2007) 1 Executive Order 13423 - Strengthening Federal Environmental, Energy, and Transportation Management in Acquisition Reference: FAR 23, 52.223, OFPP Policy Letter 07-01, DEAR 923, 952.223, 970.23, and 970.5223 Overview Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, replaces the Greening the Government series of 4 Executive Orders intended to improve the Federal impact on environment, energy and transportation

  10. Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement Costs

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at ...

  11. Recent Improvement Of The Institutional Radioactive Waste Management System In Slovenia

    SciTech Connect (OSTI)

    Sueiae, S.; Fabjan, M.; Hrastar, U.; Mali, T.; Steinkuhler, C.; Lenie, K.

    2008-07-01

    The task of managing institutional radioactive waste was assigned to the Slovenian National Agency for Radwaste Management by the Governmental Decree of May 1999. This task ranges from the collection of waste at users' premises to the storage in the Central Storage Facility in (CSF) and afterwards to the planned Low and Intermediate Level Waste (LILW) repository. By this Decree ARAO also became the operator of the CSF. The CSF has been in operation since 1986. Recent improvements of the institutional radioactive waste management system in Slovenia are presented in this paper. ARAO has been working on the reestablishment of institutional radioactive waste management since 1999. The Agency has managed to prepare the most important documents and carry out the basic activities required by the legislation to assure a safe and environmentally acceptable management of the institutional radioactive waste. With the aim to achieve a better organized operational system, ARAO took the advantage of the European Union Transition Facility (EU TF) financing support and applied for the project named 'Improvement of the management of institutional radioactive waste in Slovenia via the design and implementation of an Information Business System'. Through a public invitation for tenders one of the Slovenian largest software company gained the contract. Two international radwaste experts from Belgium were part of their project team. The optimization of the operational system has been carried out in 2007. The project was executed in ten months and it was divided into two phases. The first phase of the project was related with the detection of weaknesses and implementation of the necessary improvements in the current ARAO operational system. With the evaluation of the existing system, possible improvements were identified. In the second phase of the project the software system Information Business System (IBS) was developed and implemented by the group of IT experts. As a software development life-cycle methodology the Waterfall methodology was used. The reason for choosing this methodology lied in its simple approach: analyze the problem, design the solution, implement the code, test the code, integrate and deploy. ARAO's institutional radioactive waste management process was improved in the way that it is more efficient, better organized, allowing traceability and availability of all documents and operational procedures within the field of institutional radioactive waste. The tailored made IBS system links all activities of the institutional radioactive waste management process: collection, transportation, takeover, acceptance, storing, treatment, radiation protection, etc. into one management system. All existing and newly designed evidences, operational procedures and other documents can be searched and viewed via secured Internet access from different locations. (authors)

  12. Overview of the Hanford risk management plan

    SciTech Connect (OSTI)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  13. NEPA Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy NEPA Policy Selected documents on the topic of NEPA policy. September 7, 2012 OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution This Office of Management and Budget (OMB) and Council on Environmental Quality (CEQ) joint memorandum expands and builds on the November 28, 2005, Environmental Conflict Resolution (ECR) Memorandum, directing departments and agencies to increase the appropriate and effective use of third-party assisted environmental

  14. Policy Strategies and Paths to promote Sustainable Energy Systems- The dynamic Invert Simulation Tool

    SciTech Connect (OSTI)

    Stadler, Michael; Kranzl, Lukas; Huber, Claus; Haas, Reinhard; Tsioliaridou, Elena

    2006-05-01

    The European Union has established a number of targetsregarding energy efficiency, Renewable Energy Sources (RES) and CO2reductions as the 'GREEN PAPER on Energy Efficiency', the Directive for'promotion of the use of bio-fuels or other renewable fuels fortransport' or 'Directive of the European Parliament of the Council on thepromotion of cogeneration based on a useful heat demand in the internalenergy market'. A lot of the according RES and RUE measures are notattractive for investors from an economic point of view. Thereforegovernmentsall over the world have to spend public money to promotethese technologies/measures to bring them into market. These expenditureshave to be adjusted to budget concerns and should be spent mostefficiently. Therefore, the spent money has to be dedicated totechnologies and efficiency measures with the best yield in CO2 reductionwithout wasting money. The core question: "How can public money - forpromoting sustainable energy systems - be spent most efficiently toreduce GHG-emissions?" has been well investigated by the European projectInvert. In course of this project a simulation tool has been designed toanswer this core question. This paper describes the modelling with theInvert simulation tool and shows the key features necessary forsimulating the energy system. A definition of 'Promotion SchemeEfficiency' is given which allows estimating the most cost effectivetechnologies and/or efficiency measures to reduce CO2 emissions.Investigations performed with the Invert simulation tool deliver anoptimum portfolio mix of technologies and efficiency measures for eachselected region. Within Invert seven European regions were simulated andfor the Austrian case study the detailed portfolio mix is shown andpolitical conclusions are derived.

  15. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect (OSTI)

    Hernandez, Adriana

    2012-09-21

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  16. Office of River Protection Integrated Safety Management System Description

    SciTech Connect (OSTI)

    CLARK, D.L.

    1999-08-09

    Revision O was never issued. Finding safe and environmentally sound methods of storage and disposal of 54 million gallons of highly radioactive waste contained in 177 underground tanks is the largest challenge of Hanford cleanup. TWRS was established in 1991 and continues to integrate all aspects of the treatment and management of the high-level radioactive waste tanks. In fiscal Year 1997, program objectives were advanced in a number of areas. RL TWRS refocused the program toward retrieving, treating, and immobilizing the tank wastes, while maintaining safety as first priority. Moving from a mode of storing the wastes to getting the waste out of the tanks will provide the greatest cleanup return on the investment and eliminate costly mortgage continuance. There were a number of safety-related achievements in FY1997. The first high priority safety issue was resolved with the removal of 16 tanks from the ''Wyden Watch List''. The list, brought forward by Senator Ron Wyden of Oregon, identified various Hanford safety issues needing attention. One of these issues was ferrocyanide, a chemical present in 24 tanks. Although ferrocyanide can ignite at high temperature, analysis found that the chemical has decomposed into harmless compounds and is no longer a concern.

  17. Policy Flash 2011-95

    Energy Savers [EERE]

    Division Office of Procurement and Assistance Policy Office of Acquisition and Assistance Management SUBJECT: DOE O 452.8 Control of Nuclear Weapon Data SUMMARY: On July 21, 2011,...

  18. Department of Energy Oversight Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-10

    The Policy establishes the expectations for effective oversight of performance in security, cyber security, emergency management, environment, safety and health, and business operations. Does not cancel other directives. Canceled by DOE P 226.1A.

  19. Preliminary characterization of risks in the nuclear waste management system based on information in the literature

    SciTech Connect (OSTI)

    Daling, P.M.; Rhoads, R.E.; Van Luick, A.E.; Fecht, B.A.; Nilson, S.A.; Sevigny, N.L.; Armstrong, G.R.; Hill, D.H.; Rowe, M.; Stern, E.

    1992-01-01

    This document presents preliminary information on the radiological and nonradiological risks in the nuclear waste management system. The objective of the study was to (1) review the literature containing information on risks in the nuclear waste management system and (2) use this information to develop preliminary estimates of the potential magnitude of these risks. Information was collected on a broad range of risk categories to assist the US Department of Energy (DOE) in communicating information about the risks in the waste management systems. The study examined all of the portions of the nuclear waste management system currently expected to be developed by the DOE. The scope of this document includes the potential repository, the integral MRS facility, and the transportation system that supports the potential repository and the MRS facility. Relevant literature was reviewed for several potential repository sites and geologic media. A wide range of ``risk categories`` are addressed in this report: (1) public and occupational risks from accidents that could release radiological materials, (2) public and occupational radiation exposure resulting from routine operations, (3) public and occupational risks from accidents involving hazards other than radioactive materials, and (4) public and occupational risks from exposure to nonradioactive hazardous materials during routine operations. The report is intended to provide a broad spectrum of risk-related information about the waste management system. This information is intended to be helpful for planning future studies.

  20. Methods and systems for seed planting management and control

    DOE Patents [OSTI]

    Svoboda, John M. (Idaho Falls, ID); Hess, J. Richard (Idaho Falls, ID); Hoskinson, Reed L. (Rigby, ID); Harker, David J. (Idaho Falls, ID)

    2002-01-01

    A seed planting system providing optimal seed spacing in an agricultural field. The seed planting system includes a mobile seed planter having one or more planting shoes, or members being adapted for towing by a farm vehicle or being self-propelled. Sensors, disposed proximate to respective planting shoes, detect seed planting events and send corresponding signals to a computer. Contemporaneously, a geospatial locator acquires, and transmits to the computer, the geospatial location of each planted seed. The computer correlates the geospatial location data with the seed deposition data and generates a seed distribution profile indicating the location of each seed planted in a zone of interest to enable the control of speed spacing.